MINGGU : IX (KESEMBILAN)
PEKERJAAN : PEMBANGUNAN SELASAR GEDUNG PICU NICU
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
NILAI KONTRAK : Rp. 194.830.000,-
LOKASI : RSUD KAB. KOLAKA TIMUR
SUMBER DANA : APBD MINGGU : IX ( Sembilan )
TAHUN ANGGARAN : 2023 STATUS TGL. : 01 Agustus s/d 07 Agustus 2023
VI PEKERJAAN ATAP
1. Pek. Kuda-Kuda Kayu Jati Putih M3 Rp 7,530,890.00 1.93 14,534,617.70 8.281 1.93 100.00 8.281 0.00 0.00 0.000 1.93 100.00 8.281 1.93 8.281 100.00
2. Pek. Tiang Selasar Kayu Jati Putih M3 Rp 7,530,890.00 1.16 8,735,832.40 4.977 1.16 100.00 4.977 0.00 0.00 0.000 1.16 100.00 4.977 1.16 4.977 100.00
3 Pek. Gording, Ringbalk & Balok Nok Kayu Jati Putih M3 Rp 5,968,270.00 2.15 12,831,780.50 7.311 2.15 100.00 7.311 0.00 0.00 0.000 2.15 100.00 7.311 2.15 7.311 100.00
4 Pek. Listplank (Aplus Plank L20) M' Rp 78,487.50 113.00 8,869,087.50 5.053 0.00 - 0.000 0.00 100.00 5.053 0.00 100.00 5.053 113.00 5.053 100.00
5 Pek. Atap Spandeck M2 Rp 122,532.50 272.84 33,431,767.30 19.047 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
6 Pek. Bubungan Seng Plat M' Rp 37,403.75 62.00 2,319,032.50 1.321 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
SUB TOTAL VI 80,722,117.90 45.99 20.568 5.053 25.621 25.621
VII PEKERJAAN PENUTUP LANTAI
1. Pek. Pasangan Lantai Keramik Ukuran (40 x 40) cm Putih M2 Rp 211,105.50 96.00 20,266,128.00 11.546 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
2. Pek. Pasangan Lantai Keramik Ukuran (40 x 40) cm Hitam M2 Rp 249,228.00 48.00 11,962,944.00 6.816 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
SUB TOTAL VII 32,229,072.00 18.36 0.000 0.000 0.000 0.000
VIII PEKERJAAN INSTALASI LISTRIK
1. Pemasangan Titik Instalasi Penerangan ttk Rp 100,000.00 11.00 1,100,000.00 0.627 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
2. Kabel Instalasi Lampu NYA 2 x 2,5 mm M' Rp 11,000.00 70.00 770,000.00 0.439 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
3 Lampu SL 23 Watt Bh Rp 125,000.00 11.00 1,375,000.00 0.783 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
4 Pemas. Fitting Lampu Bh Rp 15,000.00 11.00 165,000.00 0.094 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
SUB TOTAL VIII 3,410,000.00 1.94 0.000 0.000 0.000 0.000
IX PEKERJAAN FINISHING
1. Pek. Pengecatan Kaki Tiang Selasar M2 Rp 46,034.50 32.00 1,473,104.00 0.839 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
2. Pek. Pengecatan Kuda-Kuda M2 Rp 49,329.25 269.92 13,314,951.16 7.586 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
SUB TOTAL IX 14,788,055.16 8.43 0.000 0.000 0.000 0.000
SUB TOTAL (I) + (II) + (III) + (IV) + (V) + (VI) + (VII) + (VIII) + (IX) 175,522,532.83 100.00 43.271 5.053 50.760 50.760
MINGGU : X (KESEPULUH)
PEKERJAAN : PEMBANGUNAN SELASAR GEDUNG PICU NICU
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
NILAI KONTRAK : Rp. 194.830.000,-
LOKASI : RSUD KAB. KOLAKA TIMUR
SUMBER DANA : APBD MINGGU : X ( Kesepuluh )
TAHUN ANGGARAN : 2023 STATUS TGL. : 08 Agustus s/d 14 Agustus 2023
II PEKERJAAN TANAH
1. Pek. Galian Tanah M3 Rp 89,775.00 5.50 493,762.50 0.281 5.50 100.00 0.281 0.00 0.00 0.000 5.50 100.00 0.281 5.50 0.281 100.00
2. Pek. Urugan Tanah Bawah Lantai (Material Didatangkan) M3 Rp 138,510.00 11.77 1,630,262.70 0.929 11.77 100.00 0.929 0.00 0.00 0.000 11.77 100.00 0.929 11.77 0.929 100.00
3 Pek. Urugan Pasir Bawah Lantai M3 Rp 309,510.00 6.95 2,151,094.50 1.226 6.95 100.00 1.226 0.00 0.00 0.000 6.95 100.00 1.226 6.95 1.226 100.00
SUB TOTAL II 4,275,119.70 2.44 2.436 0.000 2.436 2.436
III PEKERJAAN PONDASI
1. Pek. Pondasi Batu Gunung Kaki Tiang Selasar M3 Rp 1,063,933.50 3.24 3,447,144.54 1.964 3.24 100.00 1.964 0.00 0.00 0.000 3.24 100.00 1.964 3.24 1.964 100.00
2. Pek. Pondasi Beton Cor m3 Rp 1,505,077.13 5.53 8,323,076.52 4.742 5.53 100.00 4.742 0.00 0.00 0.000 5.53 100.00 4.742 5.53 4.742 100.00
SUB TOTAL III 11,770,221.06 6.71 6.706 0.000 6.706 6.706
IV PEKERJAAN BETON
1. Pek. Beton Pengisi Kaki Tiang Selasar M3 Rp 1,505,077.13 0.96 1,444,874.04 0.823 0.96 100.00 0.823 0.00 0.00 0.000 0.96 100.00 0.823 0.96 0.823 100.00
2. Pek. Rabat Beton Bawah Lantai M3 Rp 1,518,279.56 8.60 13,057,204.22 7.439 8.60 100.00 7.439 0.00 0.00 0.000 8.60 100.00 7.439 8.60 7.439 100.00
SUB TOTAL IV 14,502,078.26 8.26 8.262 0.000 8.262 8.262
V PEKERJAAN PLESTERAN
1. Pek. Plesteran Permukaan Pondasi 1 PC : 3 PP Tebal 15 mm M2 Rp 68,453.75 7.50 513,403.13 0.292 7.50 100.00 0.292 0.00 0.00 0.000 7.50 100.00 0.292 7.50 0.292 100.00
2. Pek. Acian / Dilicin Permukaan Pondasi 1 PC : 3 PP Tebal 15 mm M2 Rp 48,328.75 7.50 362,465.63 0.207 7.50 100.00 0.207 0.00 0.00 0.000 7.50 100.00 0.207 7.50 0.207 100.00
3. Kaki Pilar Pracetak Bh Rp 300,000.00 40.00 12,000,000.00 6.837 40.00 100.00 6.837 0.00 0.00 0.000 40.00 100.00 6.837 40.00 6.837 100.00
SUB TOTAL V 12,875,868.75 7.34 7.336 0.000 7.336 7.336
VI PEKERJAAN ATAP
1. Pek. Kuda-Kuda Kayu Jati Putih M3 Rp 7,530,890.00 1.93 14,534,617.70 8.281 1.93 100.00 8.281 0.00 0.00 0.000 1.93 100.00 8.281 1.93 8.281 100.00
2. Pek. Tiang Selasar Kayu Jati Putih M3 Rp 7,530,890.00 1.16 8,735,832.40 4.977 1.16 100.00 4.977 0.00 0.00 0.000 1.16 100.00 4.977 1.16 4.977 100.00
3 Pek. Gording, Ringbalk & Balok Nok Kayu Jati Putih M3 Rp 5,968,270.00 2.15 12,831,780.50 7.311 2.15 100.00 7.311 0.00 0.00 0.000 2.15 100.00 7.311 2.15 7.311 100.00
4 Pek. Listplank (Aplus Plank L20) M' Rp 78,487.50 113.00 8,869,087.50 5.053 113.00 100.00 5.053 0.00 0.00 0.000 113.00 100.00 5.053 113.00 5.053 100.00
5 Pek. Atap Spandeck M2 Rp 122,532.50 272.84 33,431,767.30 19.047 0.00 - 0.000 136.42 50.00 9.523 136.42 50.00 9.523 136.42 9.523 50.00
6 Pek. Bubungan Seng Plat M' Rp 37,403.75 62.00 2,319,032.50 1.321 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
SUB TOTAL VI 80,722,117.90 45.99 25.621 9.523 35.145 35.145
VII PEKERJAAN PENUTUP LANTAI
1. Pek. Pasangan Lantai Keramik Ukuran (40 x 40) cm Putih M2 Rp 211,105.50 96.00 20,266,128.00 11.546 0.00 - 0.000 0.00 25.00 2.887 0.00 25.00 2.887 24.00 2.887 25.00
2. Pek. Pasangan Lantai Keramik Ukuran (40 x 40) cm Hitam M2 Rp 249,228.00 48.00 11,962,944.00 6.816 0.00 - 0.000 0.00 25.00 1.704 0.00 25.00 1.704 12.00 1.704 25.00
SUB TOTAL VII 32,229,072.00 18.36 0.000 4.590 4.590 4.590
VIII PEKERJAAN INSTALASI LISTRIK
1. Pemasangan Titik Instalasi Penerangan ttk Rp 100,000.00 11.00 1,100,000.00 0.627 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
2. Kabel Instalasi Lampu NYA 2 x 2,5 mm M' Rp 11,000.00 70.00 770,000.00 0.439 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
3. Lampu SL 23 Watt Bh Rp 125,000.00 11.00 1,375,000.00 0.783 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
4. Pemas. Fitting Lampu M' Rp 15,000.00 11.00 165,000.00 0.094 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
SUB TOTAL VIII 3,410,000.00 1.94 0.000 0.000 0.000 0.000
IX PEKERJAAN FINISHING
1. Pek. Pengecatan Kaki Tiang Selasar M2 Rp 46,034.50 32.00 1,473,104.00 0.839 0.00 - 0.000 0.00 0.00 0.000 0.00 0.00 0.000 0.00 0.000 0.00
2. Pek. Pengecatan Kuda-Kuda M2 Rp 49,329.25 269.92 13,314,951.16 7.586 0.00 - 0.000 0.00 50.00 3.793 0.00 50.00 3.793 134.96 3.793 50.00
SUB TOTAL IX 14,788,055.16 8.43 0.000 3.793 3.793 3.793
SUB TOTAL (I) + (II) + (III) + (IV) + (V) + (VI) + (VII) + (VIII) + (IX) 175,522,532.83 100.00 50.760 17.907 68.667 68.667
MINGGU : XI (KESEBELAS)
PEKERJAAN : PEMBANGUNAN SELASAR GEDUNG PICU NICU
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
NILAI KONTRAK : Rp. 194.830.000,-
LOKASI : RSUD KAB. KOLAKA TIMUR
SUMBER DANA : APBD MINGGU : XI ( Kesebelas )
TAHUN ANGGARAN : 2023 STATUS TGL. : 15 Agustus s/d 21 Agustus 2023
1. Pek. Galian Tanah M3 Rp 89,775.00 5.50 493,762.50 0.281 5.50 100.00 0.281 0.00 0.00 0.000 5.50 100.00 0.281 5.50 0.281 100.00
2. Pek. Urugan Tanah Bawah Lantai (Material Didatangkan) M3 Rp 138,510.00 11.77 1,630,262.70 0.929 11.77 100.00 0.929 0.00 0.00 0.000 11.77 100.00 0.929 11.77 0.929 100.00
3 Pek. Urugan Pasir Bawah Lantai M3 Rp 309,510.00 6.95 2,151,094.50 1.226 6.95 100.00 1.226 0.00 0.00 0.000 6.95 100.00 1.226 6.95 1.226 100.00
SUB TOTAL II 4,275,119.70 2.44 0.000 0.000 2.436 2.436
III PEKERJAAN PONDASI
1. Pek. Pondasi Batu Gunung Kaki Tiang Selasar M3 Rp 1,063,933.50 3.24 3,447,144.54 1.964 3.24 100.00 1.964 0.00 0.00 0.000 3.24 100.00 1.964 3.24 1.964 100.00
2. Pek. Pondasi Beton Cor m3 Rp 1,505,077.13 5.53 8,323,076.52 4.742 5.53 100.00 4.742 0.00 0.00 0.000 5.53 100.00 4.742 5.53 4.742 100.00
SUB TOTAL III 11,770,221.06 6.71 6.706 0.000 6.706 6.706
IV PEKERJAAN BETON
1. Pek. Beton Pengisi Kaki Tiang Selasar M3 Rp 1,505,077.13 0.96 1,444,874.04 0.823 0.96 100.00 0.823 0.00 0.00 0.000 0.96 100.00 0.823 0.96 0.823 100.00
2. Pek. Rabat Beton Bawah Lantai M3 Rp 1,518,279.56 8.60 13,057,204.22 7.439 8.60 100.00 7.439 0.00 0.00 0.000 8.60 100.00 7.439 8.60 7.439 100.00
SUB TOTAL IV 14,502,078.26 8.26 8.262 0.000 8.262 8.262
V PEKERJAAN PLESTERAN
1. Pek. Plesteran Permukaan Pondasi 1 PC : 3 PP Tebal 15 mm M2 Rp 68,453.75 7.50 513,403.13 0.292 7.50 100.00 0.292 0.00 0.00 0.000 7.50 100.00 0.292 7.50 0.292 100.00
2. Pek. Acian / Dilicin Permukaan Pondasi 1 PC : 3 PP Tebal 15 mm M2 Rp 48,328.75 7.50 362,465.63 0.207 7.50 100.00 0.207 0.00 0.00 0.000 7.50 100.00 0.207 7.50 0.207 100.00
3. Kaki Pilar Pracetak Bh Rp 300,000.00 40.00 12,000,000.00 6.837 40.00 100.00 6.837 0.00 0.00 0.000 40.00 100.00 6.837 40.00 6.837 100.00
SUB TOTAL V 12,875,868.75 7.34 7.336 0.000 7.336 7.336
VI PEKERJAAN ATAP
1. Pek. Kuda-Kuda Kayu Jati Putih M3 Rp 7,530,890.00 1.93 14,534,617.70 8.281 1.93 100.00 8.281 0.00 0.00 0.000 1.93 100.00 8.281 1.93 8.281 100.00
2. Pek. Tiang Selasar Kayu Jati Putih M3 Rp 7,530,890.00 1.16 8,735,832.40 4.977 1.16 100.00 4.977 0.00 0.00 0.000 1.16 100.00 4.977 1.16 4.977 100.00
3 Pek. Gording, Ringbalk & Balok Nok Kayu Jati Putih M3 Rp 5,968,270.00 2.15 12,831,780.50 7.311 2.15 100.00 7.311 0.00 0.00 0.000 2.15 100.00 7.311 2.15 7.311 100.00
4 Pek. Listplank (Aplus Plank L20) M' Rp 78,487.50 113.00 8,869,087.50 5.053 113.00 100.00 5.053 0.00 0.00 0.000 113.00 100.00 5.053 113.00 5.053 100.00
5 Pek. Atap Spandeck M2 Rp 122,532.50 272.84 33,431,767.30 19.047 272.84 100.00 19.047 0.00 0.00 0.000 272.84 100.00 19.047 272.84 19.047 100.00
6 Pek. Bubungan Seng Plat M' Rp 37,403.75 62.00 2,319,032.50 1.321 0.00 - 0.000 0.00 100.00 1.321 0.00 100.00 1.321 62.00 1.321 100.00
SUB TOTAL VI 80,722,117.90 45.99 44.668 1.321 45.990 45.990
VII PEKERJAAN PENUTUP LANTAI
1. Pek. Pasangan Lantai Keramik Ukuran (40 x 40) cm Putih M2 Rp 211,105.50 96.00 20,266,128.00 11.546 24.00 25.00 2.887 72.00 75.00 8.660 96.00 100.00 11.546 96.00 11.546 100.00
1. Pek. Pasangan Lantai Keramik Ukuran (40 x 40) cm Hitam M2 Rp 249,228.00 48.00 11,962,944.00 6.816 24.00 50.00 3.408 24.00 50.00 3.408 48.00 100.00 6.816 48.00 6.816 100.00
SUB TOTAL VII 32,229,072.00 18.36 6.294 12.067 18.362 18.362
VIII PEKERJAAN INSTALASI LISTRIK
1. Pemasangan Titik Instalasi Penerangan ttk Rp 100,000.00 11.00 1,100,000.00 0.627 0.00 - 0.000 11.00 100.00 0.627 11.00 100.00 0.627 11.00 0.627 100.00
2. Kabel Instalasi Lampu NYA 2 x 2,5 mm M' Rp 11,000.00 70.00 770,000.00 0.439 0.00 - 0.000 0.00 100.00 0.439 0.00 100.00 0.439 70.00 0.439 100.00
3 Lampu SL 23 Watt Bh Rp 125,000.00 11.00 1,375,000.00 0.783 0.00 - 0.000 11.00 100.00 0.783 11.00 100.00 0.783 11.00 0.783 100.00
4 Pemas. Fitting Lampu M' Rp 15,000.00 11.00 165,000.00 0.094 0.00 - 0.000 0.00 100.00 0.094 0.00 100.00 0.094 11.00 0.094 100.00
SUB TOTAL VIII 3,410,000.00 1.94 0.000 1.943 1.943 1.943
IX PEKERJAAN FINISHING
1. Pek. Pengecatan Kaki Tiang Selasar M2 Rp 46,034.50 32.00 1,473,104.00 0.839 0.00 - 0.000 32.00 100.00 0.839 32.00 100.00 0.839 32.00 0.839 100.00
2. Pek. Pengecatan Kuda-Kuda M2 Rp 49,329.25 269.92 13,314,951.16 7.586 269.92 100.00 7.586 0.00 0.00 0.000 269.92 100.00 7.586 269.92 7.586 100.00
SUB TOTAL XV 14,788,055.16 8.43 7.586 0.839 8.425 8.425
SUB TOTAL (I) + (II) + (III) + (IV) + (V) + (VI) + (VII) + (VIII) + (IX) 175,522,532.83 100.00 81.394 16.171 100.000 100.000
REKAPITULASI
PROGRESS REPORT FISIK BULANAN
PERIODE Agustus 2023
BULAN KE : III (KETIGA)
PEKERJAAN
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
: PEMBANGUNAN SELASAR GEDUNG PICU NICU NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
RUMAH SAKIT UMUM DAERAH NILAI KONTRAK : Rp. 194.830.000,-
KABUPATEN KOLAKA TIMUR LOKASI : RSUD KAB. KOLAKA TIMUR
TAHUN ANGGARAN 2023 TAHUN ANGGARAN : 2023
III PEKERJAAN PONDASI 11,770,221.06 6.71 6.71 6.706 6.706 6.706 0.000
VII PEKERJAAN PENUTUP LANTAI 32,229,072.00 18.36 0.000 4.590 6.294 18.362 0.000
VIII PEKERJAAN INSTALASI LISTRIK 3,410,000.00 1.94 0.000 0.000 0.000 1.943 0.000
DIKETAHUI/DISETUJUI :
PEJABAT PEMBUAT KOMITMEN (PPK)
Rumah Sakit Umum Daerah
Kabupaten Kolaka Timur
REKAPITULASI
PROGRESS REPORT
MINGGU : IX (KESEMBILAN)
PEKERJAAN
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
: PEMBANGUNAN SELASAR GEDUNG PICU NICU NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
RUMAH SAKIT UMUM DAERAH NILAI KONTRAK : Rp. 194.830.000,-
KABUPATEN KOLAKA TIMUR LOKASI : RSUD KAB. KOLAKA TIMUR
TAHUN ANGGARAN 2023 TAHUN ANGGARAN : 2023
RENCANA REALISASI SISA BOBOT
NO. URAIAN PEKERJAAN JUMLAH HARGA ( Rp ) BOBOT BOBOT PEKERJAAN KETERANGAN
(%) (%) (%)
DIKETAHUI/DISETUJUI :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
Rumah Sakit Umum Daerah
Kabupaten Kolaka Timur
REKAPITULASI
PROGRESS REPORT
MINGGU : X (KESEPULUH)
PEKERJAAN
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
: PEMBANGUNAN SELASAR GEDUNG PICU NICU NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
RUMAH SAKIT UMUM DAERAH NILAI KONTRAK : Rp. 194.830.000,-
KABUPATEN KOLAKA TIMUR LOKASI : RSUD KAB. KOLAKA TIMUR
TAHUN ANGGARAN 2023 TAHUN ANGGARAN : 2023
RENCANA REALISASI SISA BOBOT
NO. URAIAN PEKERJAAN JUMLAH HARGA ( Rp ) BOBOT BOBOT PEKERJAAN KETERANGAN
(%) (%) (%)
DIKETAHUI/DISETUJUI :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
Rumah Sakit Umum Daerah
Kabupaten Kolaka Timur
REKAPITULASI
PROGRESS REPORT
MINGGU : XI (KESEBELAS)
PEKERJAAN
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
: PEMBANGUNAN SELASAR GEDUNG PICU NICU NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
RUMAH SAKIT UMUM DAERAH NILAI KONTRAK : Rp. 194.830.000,-
KABUPATEN KOLAKA TIMUR LOKASI : RSUD KAB. KOLAKA TIMUR
TAHUN ANGGARAN 2023 TAHUN ANGGARAN : 2023
RENCANA REALISASI SISA BOBOT
NO. URAIAN PEKERJAAN JUMLAH HARGA ( Rp ) BOBOT BOBOT PEKERJAAN KETERANGAN
(%) (%) (%)
DIKETAHUI/DISETUJUI :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
Rumah Sakit Umum Daerah
Kabupaten Kolaka Timur
REKAPITULASI
PROGRESS REPORT
MINGGU : XII (KEDUA BELAS)
PEKERJAAN
KONTRAKTOR PELAKSANA : CV. ASHAR GROUP
: PEMBANGUNAN SELASAR GEDUNG PICU NICU NOMOR KONTRAK : 000.3.2/4241/VI/2023
TANGGAL KONTRAK : 05 JUNI 2023
RUMAH SAKIT UMUM DAERAH NILAI KONTRAK : Rp. 194.830.000,-
KABUPATEN KOLAKA TIMUR LOKASI : RSUD KAB. KOLAKA TIMUR
TAHUN ANGGARAN 2023 TAHUN ANGGARAN : 2023
RENCANA REALISASI SISA BOBOT
NO. URAIAN PEKERJAAN JUMLAH HARGA ( Rp ) BOBOT BOBOT PEKERJAAN KETERANGAN
(%) (%) (%)
DIKETAHUI/DISETUJUI :
PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
Rumah Sakit Umum Daerah
Kabupaten Kolaka Timur