PEMBERI TUGAS KONSULTAN SUPERVISI PENYEDIA JASA

KEMENTRIAN PEKERJAAN UMUM DAN PERUMAHAN RAKYAT


DIREKTORAT JENDERAL BINA MARGA
BALAI PELAKSANAAN JALAN NASIONAL RIAU
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II PROVINSI RIAU

LAPORAN BULANAN
Pekerjaan : PENANGANAN LONGSORAN RUAS MARPOYAN - MA. LEMBU - BTS. PROV. SUMBAR PERIODE : 26 Maret 2022 S/D 25 April 2022 Bulan ke - : 3
Lokasi : KABUTATEN KUATAN SINGINGI Bulan : APRIL
Nomor Kontrak : HK.02.01-Bb23-Wil2.R5/02/2022
Tanggal Kontrak : 14 Februari 2022
Nomor Adendum 1 : ADD-01/HK.02.01-Bb23-Wil2.R5/02/2022
Tanggal Adendum 1 : 18 April 2022

KONTRAK KEMAJUAN PEKERJAAN


BOBOT S/D BULAN LALU BULAN INI S/D BULAN INI
NO URAIAN PEKERJAAN SAT VOLUME VOLUME HARGA SATUAN TOTAL HARGA ADD 1 BOBOT
JUMLAH HARGA (Rp) ADD 1 PROGRESS BOBOT PROGRESS BOBOT PROGRESS BOBOT
KONTRAK ADD 1 (Rp) (Rp) VOLUME VOLUME VOLUME
(%) (%) (%) (%) (%) (%) (%) (%)
I. DIVISI 1. - UMUM
1.2 Mobilisasi LS 1.00 1.00 84,400,000.00 84,400,000.00 84,400,000.00 0.601 0.601 0.70 70.000% 0.420% - 0.000% 0.000% 0.70 70.000% 0.420%
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 1.00 58,081,360.00 58,081,360.00 58,081,360.00 0.413 0.413 0.14 14.286% 0.059% 0.11 11.429% 0.047% 0.26 25.714% 0.106%
1.17 Pengamanan Lingkungan Hidup 0 - - - - - - - - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
1.17.(1a) Pengujian pH Buah 3.00 3.00 408,500.00 1,225,500.00 1,225,500.00 0.009 0.009 1.00 33.333% 0.003% - 0.000% 0.000% 1.00 33.333% 0.003%
1.17.(1b) Pengujian Oksigen Terlarut (DO) Buah 3.00 3.00 47,500.00 142,500.00 142,500.00 0.001 0.001 1.00 33.333% 0.000% - 0.000% 0.000% 1.00 33.333% 0.000%
1.17.(1c) Pengujian Zat Padat Terlarut (TDS) Buah 3.00 3.00 47,500.00 142,500.00 142,500.00 0.001 0.001 1.00 33.333% 0.000% - 0.000% 0.000% 1.00 33.333% 0.000%
1.17.(1d) Pengujian Zat Tersuspensi (TSS) Buah 3.00 3.00 47,500.00 142,500.00 142,500.00 0.001 0.001 1.00 33.333% 0.000% - 0.000% 0.000% 1.00 33.333% 0.000%
1.17.(1e) Pengujian Biological Oxygen Demand (BOD) Buah 3.00 3.00 95,000.00 285,000.00 285,000.00 0.002 0.002 1.00 33.333% 0.001% - 0.000% 0.000% 1.00 33.333% 0.001%
1.17.(1f) Pengujian Chemical Oxygen Demand (COD) Buah 3.00 3.00 142,500.00 427,500.00 427,500.00 0.003 0.003 1.00 33.333% 0.001% - 0.000% 0.000% 1.00 33.333% 0.001%
1.17.(1g) Pengujian Coliform Buah 3.00 3.00 190,000.00 570,000.00 570,000.00 0.004 0.004 1.00 33.333% 0.001% - 0.000% 0.000% 1.00 33.333% 0.001%
1.17.(1h) Pengujian Ecoli Buah 3.00 3.00 190,000.00 570,000.00 570,000.00 0.004 0.004 1.00 33.333% 0.001% - 0.000% 0.000% 1.00 33.333% 0.001%
1.17.(1i) Pengujian Destruksi Cu,Pb,Cd,Ni,Fe,Zn,Ag,Co,Mn Buah 3.00 3.00 513,000.00 1,539,000.00 1,539,000.00 0.011 0.011 1.00 33.333% 0.004% - 0.000% 0.000% 1.00 33.333% 0.004%
1.17.(1j) Pengujian temperatur (Suhu) Buah 3.00 3.00 19,000.00 57,000.00 57,000.00 0.000 0.000 1.00 33.333% 0.000% - 0.000% 0.000% 1.00 33.333% 0.000%
1.17.(2a) Pengujian Vibrasi Lingkungan untuk Kenyamanan dan Kesehatan Buah 3.00 3.00 142,500.00 427,500.00 427,500.00 0.003 0.003 1.00 33.333% 0.001% - 0.000% 0.000% 1.00 33.333% 0.001%
1.17.(2b) Pengujian tingkat getaran kendaraan bermotor Buah 3.00 3.00 475,000.00 1,425,000.00 1,425,000.00 0.010 0.010 1.00 33.333% 0.003% - 0.000% 0.000% 1.00 33.333% 0.003%
1.17.(3a) Pengujian NoX Buah 3.00 3.00 374,300.00 1,122,900.00 1,122,900.00 0.008 0.008 1.00 33.333% 0.003% - 0.000% 0.000% 1.00 33.333% 0.003%
1.17.(3b) Pengujian Sulfurdioksida (SO2) Buah 3.00 3.00 285,000.00 855,000.00 855,000.00 0.006 0.006 1.00 33.333% 0.002% - 0.000% 0.000% 1.00 33.333% 0.002%
1.17.(3c) Pengujian Karbondioksida (CO2) Buah 3.00 3.00 285,000.00 855,000.00 855,000.00 0.006 0.006 1.00 33.333% 0.002% - 0.000% 0.000% 1.00 33.333% 0.002%
1.17.(3d) Pengujian Hidro Carbon (HC)-CH4 Buah 3.00 3.00 570,000.00 1,710,000.00 1,710,000.00 0.012 0.012 1.00 33.333% 0.004% - 0.000% 0.000% 1.00 33.333% 0.004%
1.17.(3f) Pengujian Total Partikulat (TSP) - Debu Buah 3.00 3.00 285,000.00 855,000.00 855,000.00 0.006 0.006 1.00 33.333% 0.002% - 0.000% 0.000% 1.00 33.333% 0.002%
1.17.(3g) Pengujian Timah Hitam (Pb) Buah 3.00 3.00 380,000.00 1,140,000.00 1,140,000.00 0.008 0.008 1.00 33.333% 0.003% - 0.000% 0.000% 1.00 33.333% 0.003%
1.17.(3h) Pengujian parameter udara emisi dan ambien lainnya .... Buah 3.00 3.00 950,000.00 2,850,000.00 2,850,000.00 0.020 0.020 1.00 33.333% 0.007% - 0.000% 0.000% 1.00 33.333% 0.007%
1.19 Keselamatan dan Kesehatan Kerja LS 1.00 1.00 29,325,000.00 29,325,000.00 29,325,000.00 0.209 0.209 0.14 14.286% 0.030% 0.11 11.429% 0.024% 0.26 25.714% 0.054%
1.20.(1) Pengeboran, termasuk SPT dan Laporan M1 - 51.50 752,541.09 - 38,755,866.14 - 0.276 - 0.000% 0.000% 51.50 100.000% 0.276% 51.50 100.000% 0.276%
1.21 Manajemen Mutu LS 1.00 1.00 22,369,975.11 22,369,975.11 22,369,975.11 0.159 0.159 0.14 14.286% 0.023% 0.11 11.429% 0.018% 0.26 25.714% 0.041%
Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 210,518,235.11 249,274,101.25 1.498 1.774 0.571% 0.365% 0.936%
II. DIVISI 2. DRAINASE
2.1.(1) Galian Untuk Selokan Drainase dan Saluran Air M3 - 52.20 33,535.95 - 1,750,576.59 - 0.012 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
2.2.(1) Pasangan Batu dengan Mortar M3 - 44.40 927,049.41 - 41,160,993.80 - 0.293 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
2.3.(15) Gorong - gorong kotak beton bertulang, Ukuran dalam 100 cm X 100 cm M3 12.50 48.00 6,614,705.45 82,683,818.13 317,505,861.60 0.588 2.259 - 0.000% 0.000% 4.00 8.333% 0.188% 4.00 8.333% 0.188%
2.4.(1) Bahan Drainase Porous atau penyaring (filter) M3 182.50 108.00 298,618.41 54,497,859.83 32,250,788.28 0.388 0.229 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 137,181,677.95 392,668,220.27 0.976 2.794 0.000% 0.188% 0.188%
III DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa M3 4,369.00 1,008.98 38,093.53 166,430,632.57 38,435,609.90 1.184 0.273 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
3.1.(4) Galian struktur 0 - 2 meter M3 - 571.80 27,565.87 - 15,762,164.47 - 0.112 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
3.1.(5) Galian struktur 2 - 4 meter M3 - 311.31 317,005.81 - 98,686,444.70 - 0.702 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
3.2.(1a) Timbunan Biasa dari sumber galian M3 - 1,028.32 121,601.49 - 125,045,244.20 - 0.890 - 0.000% 0.000% 964.08 93.753% 0.834% 964.08 93.753% 0.834%
3.2.(2a) Timbunan Pilihan dari sumber galian M3 3,035.20 2,298.21 153,230.13 465,084,090.58 352,154,250.92 3.309 2.506 - 0.000% 0.000% 1,271.29 55.317% 1.386% 1,271.29 55.317% 1.386%
3.5.(2a) Geotextil Separator Klas 1 M2 2,500.00 2,500.00 41,386.76 103,466,900.00 103,466,900.00 0.736 0.736 - 0.000% 0.000% 1,091.00 43.640% 0.321% 1,091.00 43.640% 0.321%
Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 734,981,623.15 733,550,614.18 5.230 5.220 0.000% 2.542% 2.542%
V DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A M3 750.50 99.00 745,700.22 559,648,015.11 73,824,321.78 3.982 0.525 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 559,648,015.11 73,824,321.78 3.982 0.525 0.000% 0.000% 0.000%
VI DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi Liter 789.70 297.00 21,497.31 16,976,425.71 6,384,701.07 0.121 0.045 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi Liter 595.50 1,065.00 22,359.12 13,314,855.96 23,812,462.80 0.095 0.169 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
6.3(5a) Laston Lapis Aus (AC-WC) Ton 293.70 142.90 1,495,649.23 439,272,178.85 213,722,292.37 3.126 1.521 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
6.3(6a) Laston Lapis Antara (AC-BC) Ton 441.90 189.19 1,419,209.41 627,148,638.28 268,498,809.07 4.462 1.910 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
6.3(7a) Laston Lapis Fondasi (AC-Base) Ton 137.40 106.79 1,315,580.92 180,760,818.41 140,484,308.54 1.286 1.000 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
6.3.(8) Bahan anti pengelupasan Kg 149.10 46.30 130,295.00 19,426,984.50 6,032,658.50 0.138 0.043 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,296,899,901.71 658,935,232.35 9.228 4.689 0.000% 0.000% 0.000%
VII DIVISI 7. STRUKTUR
7.1 (5a) Beton struktur, fc’30 MPa M3 340.70 352.35 2,357,512.89 803,204,641.62 830,669,666.79 5.715 5.911 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
7.1 (7a) Beton strukur, fc’20 MPa M3 778.60 279.05 1,739,974.78 1,354,744,363.71 485,542,448.04 9.640 3.455 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
7.1 (10) Beton, fc’10 Mpa M3 288.00 39.55 1,109,830.85 319,631,284.80 43,893,810.12 2.274 0.312 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
7.3 (1) Baja Tulangan Polos-BjTP 280 Kg 323.00 362.31 20,459.51 6,608,421.73 7,412,760.15 0.047 0.053 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
7.3 (3) Baja Tulangan Sirip BjTS 420A Kg 43,402.80 41,507.59 20,751.01 900,651,936.83 861,324,326.90 6.409 6.129 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan M1 5,442.60 240.00 18,014.60 98,046,261.96 4,323,504.00 0.698 0.031 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
7.6.(12b) Penyediaan Tiang Pancang Beton Pratekan Pracetak diameter 600 mm M1 1,479.90 1,494.00 1,142,992.15 1,691,514,082.79 1,707,630,272.10 12.036 12.150 - 0.000% 0.000% 1,467.00 98.193% 11.931% 1,467.00 98.193% 11.931%
7.6.(18b) Pemancangan Tiang Pancang Beton Pratekan Pracetak diameter 600 mm M1 1,479.90 1,494.00 297,273.10 439,934,460.69 444,126,011.40 3.130 3.160 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
7.6.(24) Tiang uji jenis ... Ukuran .... M1 10.40 18.00 5,829,580.65 60,627,638.76 104,932,451.70 0.431 0.747 - 0.000% 0.000% 18.00 100.000% 0.747% 18.00 100.000% 0.747%
7.10.(3a) Bronjong dengan kawat yang dilapisi Galvanis M3 4,283.95 6,376.53 905,168.71 3,877,697,663.30 5,771,835,794.04 27.591 41.069 611.30 9.587% 3.937% 2,025.70 31.768% 13.047% 2,637.00 41.355% 16.984%
Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 9,552,660,756.18 10,261,691,045.24 67.971 73.016 3.937% 25.724% 29.662%
IX DIVISI 9. PEKERJAAN HARIAN DAN LAIN LAIN
9.1 (1) Mandor Jam 168.00 168.00 31,230.48 5,246,720.64 5,246,720.64 0.037 0.037 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.1 (2) Pekerja Biasa Jam 168.00 168.00 19,482.42 3,273,046.56 3,273,046.56 0.023 0.023 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.1 (4) a Dump Truck Kapasitas 3 - 4 m3 Jam 168.00 168.00 230,615.81 38,743,456.08 38,743,456.08 0.276 0.276 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.1 (5) a Truck Bak Datar 3 - 4 Ton Jam 168.00 168.00 305,886.68 51,388,962.24 51,388,962.24 0.366 0.366 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.1 (8) Motor Grader min 100 Pk Jam 168.00 168.00 411,545.53 69,139,649.04 69,139,649.04 0.492 0.492 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.1 (9) Loader Roda Karet 1,0 - 1,6 Ton Jam 168.00 168.00 471,362.72 79,188,936.96 79,188,936.96 0.563 0.563 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.1 (11) Alat penggali (Excavator) 80 - 140 Pk Jam 168.00 168.00 478,412.45 80,373,291.60 80,373,291.60 0.572 0.572 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.2.(1) Marka Jalan Termoplastik M2 - 165.00 134,319.80 - 22,162,767.00 - 0.158 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.2.(3a) Rambu Jalan Tunggal dengan Permukaan Pemantul Engineering Grade Buah - 6.00 922,715.28 - 5,536,291.68 - 0.039 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.2.(5) Patok Pengarah Buah - 180.00 191,905.08 - 34,542,914.40 - 0.246 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
9.2.(7) Rel Pengaman Jam 1,440.00 1,440.00 857,478.64 1,234,769,241.60 1,234,769,241.60 8.786 8.786 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) 1,562,123,304.72 1,624,365,277.80 11.115 11.558 0.000% 0.000% 0.000%
X DIVISI 10. PEKERJAAN PEMELIHARAAN
10.1.(4) Perbaikan Lapis Fondasi Kelas A M3 - 15.00 609,172.10 - 9,137,581.50 - 0.065 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
10.1.(9) Perbaikan Campuran Aspal Panas M3 - 15.00 3,259,825.97 - 48,897,389.55 - 0.348 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
10.1.(21) Pembersihan drainase dan saluran samping M1 - 200.00 8,348.65 - 1,669,730.00 - 0.012 - 0.000% 0.000% - 0.000% 0.000% - 0.000% 0.000%
- 59,704,701.05 - 0.425 0.000% 0.000% 0.000%

JUMLAH TOTAL I+II+III+V+VI+VII+IX 14,054,013,513.92 14,054,013,513.92 100.000 100.000 4.508% 28.819% 33.327%
REALISASI PROGRESS BULAN INI 33.327%
RENCANA PROGRESS BULAN INI 17.117%
DEVIASI 16.210%

Diperiksa Oleh : Dibuat Oleh:


Mengetahui/ Menyetujui : KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
BINA MARGA PT. Virama Karya (Persero) KSO PT. Exxo Gamindo Perkasa - PT. MELAYU RIAU
PT. Parama Karya Mandiri

ASRIL ABDUL RAHIM, ST RIRIN ASMANOVITA, ST


QUANTITY Quantity Engineer Quantity Surveyor