Anda di halaman 1dari 1

PROGRES FISIK BULANAN

DINAS PEKERJAAN UMUM DAN PENATAAN RUANG KABUPATEN SINJAI


PEMILIK KEGIATAN : LAPORAN BULAN : I (Satu)
NAMA KEGIATAN : LAPORAN NOMOR :
NAMA PEKERJAAN : RENCANA PROGRESS S/D BULAN INI :
LOKASI : REALISASI PROGRESS S/D BULAN INI : 0,164%
NO KONTRAK AWAL :
WAKTU PELAKSANAAN :
KONTRAKTOR :
KONSULTAN PENGAWAS :

CCO 1 / ADD PROGRES FISIK BULANAN


HARGA VOLUME
ITEM URAIAN SAT. SATUAN S/D BULAN LALU BULAN INI S/D BULAN INI TERHADAP KET.
BOBOT
VOLUME JUMLAH HARGA (Rp.) KONTRAK
( Rp. ) (%) VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT % VOLUME JUMLAH HARGA BOBOT %
(%)

I DI VI SI 1 UM UM
1.2 Mobilisasi Ls 28.565.000,0 1,00 28.565.000,00 4,53% 3,02 862.663,000 0,14% 0,000 - 0,00% 0,000 0,00 0,00% 0,14%
1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 8.850.000,0 1,00 8.850.000,00 1,40% 0,47 41.595,000 0,01% 0,000 - 0,00% 0,000 0,00 0,00% 0,01%
1.19 Keselamatan dan Kesehatan Kerja LS 10.750.000,0 1,00 10.750.000,00 1,70% 0,57 61.275,000 0,01% 0,000 - 0,00% 0,000 0,00 0,00% 0,01%
1.21 Manajemen Mutu LS 7.387.500,0 1,00 7.387.500,00 1,17% 0,39 68.703,750 0,01% 0,000 - 0,00% 0,000 0,00 0,00% 0,01%

SUB TOTAL DI VI SI I 55.552.500,00


II DI VI SI 3. P EK ER JAAN TANAH
3.1.(1a) Galian Biasa M3 44.266,94 31,92 1.413.059,75 0,22%
3.2.(2a) Timbunan Pilihan dari sumber galian M3 208.637,12 48,42 10.101.374,56 1,60%

SUB TOTAL DI VI SI I I I 11.514.434,31


V DI VI SI 7. STR UK TUR
7.1 (5a) Beton struktur, fc’25 Mpa M3 - 0,00 0,00 0,00%
7.1 (6) Beton struktur, fc’25 Mpa M3 3.166.245,64 77,26 244.619.388,62 38,79%
7.3 (2) Baja Tulangan Sirip BjTS 280 Kg 21.636,73 1.206,92 26.113.796,14 4,14% - - 0,00% 0,000 0,00 0,00% 0,00%
7.3 (4) Baja Tulangan Sirip BjTS 420B Kg 23.810,48 8.054,7 191.787.031,10 30,41% - - 0,00% 0,00 0,00 0,00% 0,00%
7.9.(1) Pasangan Batu M3 1.092.531,23 69,56 75.995.895,99 12,05%
7.11.(7) Expansion Join Baja Siku M1 285.000,00 16,00 4.560.000,00 0,72%
7.12.(3) Landasan Elastomerik Karet Sintetis Berlapis Baja Ukuran 350 Mm x 30 Buah 1.709.830,83 4,00 6.839.323,33 1,08%
7.13.(1) Sandaran (Railing) M1 84.343,05 24,00 2.024.233,20 0,32%
7.15.(1) Pembongkaran Pasangan Batu M1 346.468,79 33,55 11.624.027,95 1,84%

SUB TOTAL DI VI SI VI I 563.563.696,32


J U M L A H ( I+II+III+ VI+V ) 630.630.630,63 100,0% 0,164%
PPN 11% 69.369.369,37
JUMLAH TOTAL 700.000.000,00
PEMBULATAN 700.000.000,00

Mengetahui, Menyetujui, Dibuat Oleh


PEJABAT PEMBUAT KOMITMEN (PPK) PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK) Konsultan Pengawas
……………….

…………….. ………… ……….


NIP :…………….. NIP…………… Site Engineering