LAPORAN MINGGUAN KEMAJUAN PEKERJAAN

TANGGAL : 23 Oktober 2023 - 29 Oktober 2023


PROGRAM : PENGEMBANGAN PERDAGANGN DALAM NEGERI MINGGU : XIII (TIGA BELAS)
KEGIATAN : BIAYA KONTRUKSI FISIK PASAR SIDAYU SUMBER DANA APBN Kementrian Perdagangan Direktorat Jenderal Perdagangan Dalam Negeri)
LOKASI : DESA MRIYUNAN KECAMATAN SIDAYU KABUPATEN GRESIK NOMOR KONTRAK 027/465/SPK/437.56/2023
KONTRAKTOR PELAKSANA : CV. JATI JAYA TANGGAL KONTRAK 31 Juli 2023
KONSULTAN PENGAWAS : CV. MEGA KARYA PRATAMA PEKERJAAN DIMULAI 01 Agustus 2023
NILAI KONTRAK : Rp.2,152,000,000.00 DAN AKHIR 28 November 2023

KEMAJUAN TINGKAT
VOLUME HARGA JUMLAH BOBOT VOLUME HARGA JUMLAH BOBOT VOLUME VOLUME TOTAL FISIK TAHAP PENYELESAIAN
NO KONTRAK SATUAN HARGA FISIK MC0-CCO SATUAN HARGA FISIK MINGGU MINGGU VOLUME MINGGU PENYELESAIAN SELURUH KEUANGAN
( Rp ) ( Rp ) (%) ( Rp ) ( Rp ) (%) LALU INI INI PEKERJAAN PEKERJAAN
(%) (%) (%)
1 3 4 4 5.000 3 4 4 5 6 7 8 9 10 11 12
A PEKERJAAN PENDAHULUAN
1 Uitzet dan pembuatan bouwplank 160.00 m1 93,359.20 14,937,472.00 0.770 184.00 m1 93,359.20 17,178,092.80 0.886 184.00 m1 m1 184.00 m1 0.000 100.000 0.886 Rp. 17,178,092.80
2 Pembuatan Papan Nama Proyek 1.00 ls 470,967.50 470,967.50 0.024 1.00 ls 470,967.50 470,967.50 0.024 1.00 ls ls 1.00 ls 0.000 100.000 0.024 Rp. 470,967.50
3 Sewa direksi keet 16.00 m2 309,000.00 4,944,000.00 0.255 16.00 m2 309,000.00 4,944,000.00 0.255 16.00 m2 m2 16.00 m2 0.000 100.000 0.255 Rp. 4,944,000.00
4 Pekerjaan K3
a Dokumen K3 (Pembuatan Dokumen RKK Pembuatan Prosedur dan Instruksi 0.005
Kerja Penyiapan Formulir Sosialisasi , Promosi , dan Pelatihan) 1.00 Ls 100,000.00 100,000.00 0.005 1.00 Ls 100,000.00 100,000.00 1.00 Ls Ls 1.00 Ls 0.000 100.000 0.005 Rp. 100,000.00
b Spanduk (Banner) 2.00 Lmbr 100,000.00 200,000.00 0.010 2.00 Lmbr 100,000.00 200,000.00 0.010 2.00 Lmbr Lmbr 2.00 Lmbr 0.000 100.000 0.010 Rp. 200,000.00
c Papan Informasi K3 2.00 Lmbr 75,000.00 150,000.00 0.008 2.00 Lmbr 75,000.00 150,000.00 0.008 2.00 Lmbr Lmbr 2.00 Lmbr 0.000 100.000 0.008 Rp. 150,000.00
d Tali Keselamatan (Life Line) 2.00 roll 100,000.00 200,000.00 0.010 2.00 roll 100,000.00 200,000.00 0.010 2.00 roll roll 2.00 roll 0.000 100.000 0.010 Rp. 200,000.00
e Pembatas Area (Restricted Area) 1.00 Ls 400,000.00 400,000.00 0.021 1.00 Ls 400,000.00 400,000.00 0.021 1.00 Ls Ls 1.00 Ls 0.000 100.000 0.021 Rp. 400,000.00
f Helm Pelindung (Safety Helmet) 10.00 bh 45,000.00 450,000.00 0.023 10.00 bh 45,000.00 450,000.00 0.023 10.00 bh bh 10.00 bh 0.000 100.000 0.023 Rp. 450,000.00
g Pelindung Mata (Goggles , Spectacles) 10.00 bh 20,000.00 200,000.00 0.010 10.00 bh 20,000.00 200,000.00 0.010 10.00 bh bh 10.00 bh 0.000 100.000 0.010 Rp. 200,000.00
h Pelindung Pernafasan Mulut (Masker) 10.00 bh 2,977.67 29,776.66 0.002 10.00 bh 2,977.67 29,776.66 0.002 10.00 bh bh 10.00 bh 0.000 100.000 0.002 Rp. 29,776.66
i Sarung Tangan (Safety Gloves) 10.00 Set 10,000.00 100,000.00 0.005 10.00 Set 10,000.00 100,000.00 0.005 10.00 Set Set 10.00 Set 0.000 100.000 0.005 Rp. 100,000.00
j Sepatu Keselamatan (Safety Shoes) 10.00 Set 80,000.00 800,000.00 0.041 10.00 Set 80,000.00 800,000.00 0.041 10.00 Set Set 10.00 Set 0.000 100.000 0.041 Rp. 800,000.00
k Rompi Keselamatan (Safety Vest) 10.00 bh 35,000.00 350,000.00 0.018 10.00 bh 35,000.00 350,000.00 0.018 10.00 bh bh 10.00 bh 0.000 100.000 0.018 Rp. 350,000.00
l Peralatan K3 (Kotak P3KObat Luka , Perban) 1.00 unit 250,000.00 250,000.00 0.013 1.00 unit 250,000.00 250,000.00 0.013 1.00 unit unit 1.00 unit 0.000 100.000 0.013 Rp. 250,000.00
m Rambu Petunjuk 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh bh 1.00 bh 0.000 100.000 0.003 Rp. 60,000.00
n Rambu Larangan 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh bh 1.00 bh 0.000 100.000 0.003 Rp. 60,000.00
o Rambu Peringatan 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh bh 1.00 bh 0.000 100.000 0.003 Rp. 60,000.00
p Rambu Kewajiban 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh bh 1.00 bh 0.000 100.000 0.003 Rp. 60,000.00
q Rambu Informasi 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh 60,000.00 60,000.00 0.003 1.00 bh bh 1.00 bh 0.000 100.000 0.003 Rp. 60,000.00
r MAT Pemadam Api Ringan 1.00 bh 300,000.00 300,000.00 0.015 1.00 bh 300,000.00 300,000.00 0.015 1.00 bh bh 1.00 bh 0.000 100.000 0.015 Rp. 300,000.00
s Bendera K3 1.00 bh 50,000.00 50,000.00 0.003 1.00 bh 50,000.00 50,000.00 0.003 1.00 bh bh 1.00 bh 0.000 100.000 0.003 Rp. 50,000.00
t Tempat Cuci Tangan Pekerja (Westafel) 1.00 set 300,000.00 300,000.00 0.015 1.00 set 300,000.00 300,000.00 0.015 1.00 set set 1.00 set 0.000 100.000 0.015 Rp. 300,000.00
u Pekerja K3 4.00 OB 4,500,000.00 18,000,000.00 0.928 4.00 OB 4,500,000.00 18,000,000.00 0.928 2.00 OB 1.00 OB 3.00 OB 0.232 75.015 0.696 Rp. 13,502,647.06
B PEKERJAAN TANAH DAN STRUKTUR BAWAH
1 Galian Strauss D 300 mm @. 6000 mm 56.00 titik 626,991.90 35,111,546.40 1.811 28.00 titik 626,991.90 17,555,773.20 0.906 28.00 titik titik 28.00 titik 0.000 100.000 0.906 Rp. 17,555,773.20
2 Galian Tanah Pondasi Pilecap 21.00 m3 101,455.00 2,130,555.00 0.110 23.10 m3 101,455.00 2,343,610.50 0.121 23.10 m3 m3 23.10 m3 0.000 100.000 0.121 Rp. 2,343,610.50
3 Galian Tanah Pasangan Batu Kumbung 31.86 m3 101,455.00 3,232,356.30 0.167 38.40 m3 101,455.00 3,895,872.00 0.201 38.40 m3 m3 38.40 m3 0.000 100.000 0.201 Rp. 3,895,872.00
4 Pekerjaan Pasangan Batu Kumbung T.40 cm 31.86 m3 551,860.10 17,582,262.63 0.907 36.19 m3 551,860.10 19,970,024.17 1.030 36.19 m3 m3 36.19 m3 0.000 100.000 1.030 Rp. 19,970,024.17
5 Perbaikan Struktur Atas Sirtu T.20 cm 203.36 m3 191,580.00 38,959,708.80 2.010 193.52 m3 191,580.00 37,074,561.60 1.912 193.52 m3 m3 193.52 m3 0.000 100.000 1.912 Rp. 37,074,561.60
6 Pekerjaan Tiang Strauss
a Pembesian diameter 12 1,315.37 kg 12,435.71 16,357,553.29 0.844 1,277.43 kg 12,435.71 15,885,742.64 0.819 1,277.43 kg kg 1,277.43 kg 0.000 100.000 0.819 Rp. 15,885,742.64
b Pembesian Begel diameter 8 890.02 kg 12,435.71 11,068,026.16 0.571 435.20 kg 12,435.71 5,412,068.56 0.279 435.20 kg kg 435.20 kg 0.000 100.000 0.279 Rp. 5,412,068.56
c Beton Fc 30 MPa 23.74 m3 990,495.84 23,514,371.28 1.213 12.72 m3 990,495.84 12,596,135.62 0.650 12.72 m3 m3 12.72 m3 0.000 100.000 0.650 Rp. 12,596,135.62
7 Pekerjaan Pilecap
a Lantai Kerja B0, t=10 cm dibawah Pile Cap 4.20 m3 727,897.34 3,057,168.84 0.158 4.20 m3 727,897.34 3,057,168.84 0.158 4.20 m3 m3 4.20 m3 0.000 100.000 0.158 Rp. 3,057,168.84
b Pile Cap Type P2 100x150x40 - ( 28 unit )
- Pembesian D16 3,453.96 kg 12,760.16 44,073,064.96 2.273 2,289.73 kg 12,760.16 29,217,284.19 1.507 2,289.73 kg kg 2,289.73 kg 0.000 100.000 1.507 Rp. 29,217,284.19
- Begesting 98.00 m2 102,340.80 10,029,398.40 0.517 56.00 m2 102,340.80 5,731,084.80 0.296 56.00 m2 m2 56.00 m2 0.000 100.000 0.296 Rp. 5,731,084.80
- Pembongkaran Begesting 98.00 m2 8,899.20 872,121.60 0.045 56.00 m2 8,899.20 498,355.20 0.026 56.00 m2 m2 56.00 m2 0.000 100.000 0.026 Rp. 498,355.20
- Beton Fc 30 MPa 16.80 m3 990,495.84 16,640,330.14 0.858 16.80 m3 990,495.84 16,640,330.14 0.858 16.80 m3 m3 16.80 m3 0.000 100.000 0.858 Rp. 16,640,330.14
8 Pekerjaan Sloof
a Pembesian D13 1,183.94 kg 12,760.16 15,107,257.91 0.779 1,808.46 kg 12,760.16 23,076,229.91 1.190 1,808.46 kg kg 1,808.46 kg 0.000 100.000 1.190 Rp. 23,076,229.91
b Pembesian Begel 8 597.81 kg 12,435.71 7,434,188.81 0.383 816.82 kg 12,435.71 10,157,682.82 0.524 816.82 kg kg 816.82 kg 0.000 100.000 0.524 Rp. 10,157,682.82
c Begesting 70.80 m2 102,340.80 7,245,728.64 0.374 244.80 m2 102,340.80 25,053,027.84 1.292 244.80 m2 m2 244.80 m2 0.000 100.000 1.292 Rp. 25,053,027.84
d Pembongkaran Bekisting 70.80 m2 8,899.20 630,063.36 0.032 244.80 m2 8,899.20 2,178,524.16 0.112 244.80 m2 m2 244.80 m2 0.000 100.000 0.112 Rp. 2,178,524.16
e Beton Fc 30 MPa 14.16 m3 990,495.84 14,025,421.12 0.723 23.50 m3 990,495.84 23,272,690.30 1.200 23.50 m3 m3 23.50 m3 0.000 100.000 1.200 Rp. 23,272,690.30
LAPORAN MINGGUAN KEMAJUAN PEKERJAAN

TANGGAL : 23 Oktober 2023 - 29 Oktober 2023


PROGRAM : PENGEMBANGAN PERDAGANGN DALAM NEGERI MINGGU : XIII (TIGA BELAS)
KEGIATAN : BIAYA KONTRUKSI FISIK PASAR SIDAYU SUMBER DANA APBN Kementrian Perdagangan Direktorat Jenderal Perdagangan Dalam Negeri)
LOKASI : DESA MRIYUNAN KECAMATAN SIDAYU KABUPATEN GRESIK NOMOR KONTRAK 027/465/SPK/437.56/2023
KONTRAKTOR PELAKSANA : CV. JATI JAYA TANGGAL KONTRAK 31 Juli 2023
KONSULTAN PENGAWAS : CV. MEGA KARYA PRATAMA PEKERJAAN DIMULAI 01 Agustus 2023
NILAI KONTRAK : Rp.2,152,000,000.00 DAN AKHIR 28 November 2023

KEMAJUAN TINGKAT
VOLUME HARGA JUMLAH BOBOT VOLUME HARGA JUMLAH BOBOT VOLUME VOLUME TOTAL FISIK TAHAP PENYELESAIAN
NO KONTRAK SATUAN HARGA FISIK MC0-CCO SATUAN HARGA FISIK MINGGU MINGGU VOLUME MINGGU PENYELESAIAN SELURUH KEUANGAN
( Rp ) ( Rp ) (%) ( Rp ) ( Rp ) (%) LALU INI INI PEKERJAAN PEKERJAAN
(%) (%) (%)
1 3 4 4 5.000 3 4 4 5 6 7 8 9 10 11 12
C PEKERJAAN STRUKTUR TENGAH
1 Pekerjaan Kolom Pedestal 30/40
a Pembesian D16 567.41 kg 12,760.16 7,240,239.55 0.373 680.96 kg 12,760.16 8,689,155.15 0.448 680.96 kg kg 680.96 kg 0.000 100.000 0.448 Rp. 8,689,155.15
b Pembesian Begel 10 258.58 kg 12,435.71 3,215,624.60 0.166 211.68 kg 12,435.71 2,632,390.03 0.136 211.68 kg kg 211.68 kg 0.000 100.000 0.136
c Begesting 58.80 m2 157,492.15 9,260,538.42 0.478 58.80 m2 157,492.15 9,260,538.42 0.478 58.80 m2 m2 58.80 m2 0.000 100.000 0.478 Rp. 9,260,538.42
d Pembongkaran Begesting 58.80 m2 8,899.20 523,272.96 0.027 58.80 m2 8,899.20 523,272.96 0.027 58.80 m2 m2 58.80 m2 0.000 100.000 0.027 Rp. 523,272.96
e Beton Fc 30 MPa 5.04 m3 990,495.84 4,992,099.04 0.257 5.04 m3 990,495.84 4,992,099.04 0.257 5.04 m3 m3 5.04 m3 0.000 100.000 0.257 Rp. 4,992,099.04
2 Pekerjaan Rabat Beton
a Pembesian 6 - 200 mm 2,127.96 kg 12,435.71 26,462,682.81 1.365 2,527.64 kg 12,435.71 31,433,033.29 1.621 0.00 kg 307.00 kg 307.00 kg 0.197 12.146 0.197 Rp. 3,817,761.44
b Beton Fc 30 MPa 94.00 m3 990,495.84 93,106,609.12 4.802 98.35 m3 990,495.84 97,417,148.82 5.025 0.00 m3 10.00 m3 10.00 m3 0.511 10.168 0.511 Rp. 9,904,958.42
D PEKERJAAN ATAP , TALANG , DAN LISPLANK -
1 Kolom IWF 250.125.6,5.9 2,900.80 kg 32,429.55 94,071,638.64 4.852 3,147.63 kg 32,429.55 102,076,263.38 5.265 3,147.63 kg kg 3,147.63 kg 0.000 100.000 5.265 Rp. 102,076,263.38
2 Rafter IWF 250.125.6,5.9 6,176.77 kg 32,429.55 200,309,871.55 10.332 5,319.02 kg 32,429.55 172,493,535.30 8.897 5,319.02 kg kg 5,319.02 kg 0.000 100.000 8.897 Rp. 172,493,535.30
3 Rafter IWF 150.75.5.7 1,559.46 kg 32,429.55 50,572,586.04 2.609 2,041.62 kg 32,429.55 66,208,817.87 3.415 2,041.62 kg kg 2,041.62 kg 0.000 100.000 3.415 Rp. 66,208,817.87
4 Trackstang 10mm 213.36 kg 17,435.71 3,720,082.02 0.192 592.82 kg 17,435.71 10,336,164.90 0.533 592.82 kg kg 592.82 kg 0.000 100.000 0.533 Rp. 10,336,164.90
5 Gording CNP 125.50.3,2 9,028.27 kg 32,429.55 292,782,733.38 15.102 9,516.00 kg 32,429.55 308,599,597.80 15.918 9,516.00 kg kg 9,516.00 kg 0.000 100.000 15.918 Rp. 308,599,597.80
6 Sagrod 10mm 370.94 kg 32,429.55 12,029,417.28 0.620 354.24 kg 32,429.55 11,487,843.79 0.593 354.24 kg kg 354.24 kg 0.000 100.000 0.593 Rp. 11,487,843.79
7 Regel L50x50 3,058.77 kg 32,429.55 99,194,534.65 5.116 3,026.56 kg 32,429.55 98,149,849.13 5.063 3,026.56 kg kg 3,026.56 kg 0.000 100.000 5.063 Rp. 98,149,849.13
8 Plat Besi T. 6mm 583.57 kg 32,429.55 18,924,912.49 0.976 213.30 kg 32,429.55 6,917,356.79 0.357 213.30 kg kg 213.30 kg 0.000 100.000 0.357 Rp. 6,917,356.79
9 Plat Besi T. 10mm 1,472.66 kg 32,429.55 47,757,701.10 2.463 1,259.38 kg 32,429.55 40,840,980.75 2.107 1,259.38 kg kg 1,259.38 kg 0.000 100.000 2.107 Rp. 40,840,980.75
10 Baut uk. 5/8 (sambungan rafter - rafter + Sambungan rafter - kolom) 900.00 bh 12,761.70 11,485,530.00 0.592 912.00 bh 12,761.70 11,638,670.40 0.600 912.00 bh bh 912.00 bh 0.000 100.000 0.600 Rp. 11,638,670.40
11 Angkur D19 Panjang 60 cm 168.00 bh 86,818.70 14,585,541.60 0.752 168.00 bh 86,818.70 14,585,541.60 0.752 168.00 bh bh 168.00 bh 0.000 100.000 0.752 Rp. 14,585,541.60
12 Penutup Atap Spandek T.0,35 mm + isolasi 1,286.10 m2 92,354.95 118,777,701.20 6.127 1,243.30 m2 92,354.95 114,824,909.34 5.923 0.00 m2 m2 0.00 m2 0.000 0.000 0.000 Rp -
13 Penutup Nok Spandek 92.00 m1 158,111.39 14,546,247.51 0.750 94.50 m1 158,111.39 14,941,525.98 0.771 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
14 Pekerjaan Jurai Teritisan 12.75 m1 158,111.39 2,015,920.17 0.104 10.50 m1 158,111.39 1,660,169.55 0.086 10.50 m1 m1 10.50 m1 0.000 100.000 0.086 Rp. 1,660,169.55
15 Talang Air hujan ukuran lebar 40 x 25 cm( BJLS 30) + Besi siku & plat 169.24 m1 152,323.27 25,779,189.65 1.330 168.00 m1 152,323.27 25,590,308.80 1.320 0.00 m1 168.00 m1 168.00 m1 1.320 100.000 1.320 Rp. 25,590,308.80
16 Listplank GRC Ukuran Lebar 30 cm 169.24 m1 120,000.00 20,308,800.00 1.048 198.00 m1 120,000.00 23,760,000.00 1.226 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
17 Calsiboard T. 4 mm 67.70 m2 111,801.35 7,568,951.40 0.390 67.20 m2 111,801.35 7,513,050.72 0.388 0.00 m2 m2 0.00 m2 0.000 0.000 0.000 Rp -
18 Gantungan Braket Talang 40x40 170.00 bh 82,111.60 13,958,972.00 0.720 168.00 bh 82,111.60 13,794,748.80 0.712 56.00 bh 112.00 bh 168.00 bh 0.474 100.000 0.712 Rp. 13,794,748.80
19 Pipa tegak air hujan PVC Dia. 4 (AW) 140.00 m1 150,982.55 21,137,557.00 1.090 154.00 m1 150,982.55 23,251,312.70 1.199 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
20 Pemasangan Roof Drain Metal Dia. 4 28.00 bh 71,533.50 2,002,938.00 0.103 30.00 bh 71,533.50 2,146,005.00 0.111 0.00 bh bh 0.00 bh 0.000 0.000 0.000 Rp -
E PEKERJAAN DINDING
1 Penutup Dinding Spandek T. 0,35 mm +isolasi (Elv. +3.00 m) 377.28 m2 92,354.95 34,843,675.54 1.797 411.00 m2 92,354.95 37,957,884.45 1.958 0.00 m2 m2 0.00 m2 0.000 0.000 0.000 Rp -
F PEKERJAAN PELAPIS LANTAI
1 Pekerjaan Rabat untuk Keramik T.5 cm 55.20 m3 727,897.34 40,179,933.26 2.072 45.60 m3 727,897.34 33,192,118.78 1.712 0.00 m3 m3 0.00 m3 0.000 0.000 0.000 Rp -
2 Keramik Lantai 50x50 unpolish 2 warna Ex. Roman 1,016.80 m2 136,467.79 138,760,448.87 7.157 993.00 m2 136,467.79 135,512,515.47 6.990 0.00 m2 m2 0.00 m2 0.000 0.000 0.000 Rp -
G PEKERJAAN PENGECATAN
1 Pengecatan Penutup Dinding (cat interior) 377.28 m2 26,185.18 9,879,142.82 0.510 411.00 m2 26,185.18 10,762,106.93 0.555 0.00 m2 m2 0.00 m2 0.000 0.000 0.000 Rp -
2 Pengecatan Profil Baja (cat meni) 1,177.14 m2 38,372.65 45,169,981.22 2.330 1,374.43 m2 38,372.65 52,740,488.72 2.720 1,374.43 m2 m2 1,374.43 m2 0.000 100.000 2.720 Rp. 52,740,488.72
3 Pengecatan Kolom Pedestal (cat interior) 58.80 m2 26,185.18 1,539,688.29 0.079 47.04 m2 26,185.18 1,231,750.63 0.064 0.00 m2 m2 0.00 m2 0.000 0.000 0.000 Rp -
4 Pengecatan Listplank (cat interior) 67.70 m2 26,185.18 1,772,736.35 0.091 57.00 m2 26,185.18 1,492,554.98 0.077 0.00 m2 m2 0.00 m2 0.000 0.000 0.000 Rp -
H PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 0.00
1 Instalasi Titik Lampu 13.00 titik 482,349.00 6,270,537.00 0.323 13.00 titik 482,349.00 6,270,537.00 0.323 0.00 titik titik 0.00 titik 0.000 0.000 0.000 Rp -
2 Lampu Industri E.27 LED 40 WATT 13.00 bh 397,837.50 5,171,887.50 0.267 13.00 bh 397,837.50 5,171,887.50 0.267 0.00 bh bh 0.00 bh 0.000 0.000 0.000 Rp -
3 Saklar tunggal 2.00 bh 39,088.50 78,177.00 0.004 2.00 bh 39,088.50 78,177.00 0.004 0.00 bh bh 0.00 bh 0.000 0.000 0.000 Rp -
4 Box Panel PVC & 4 mcb 1.00 Unit 600,000.00 600,000.00 0.031 1.00 Unit 600,000.00 600,000.00 0.031 0.00 Unit Unit 0.00 Unit 0.000 0.000 0.000 Rp -
5 Kabel Fedeer ( Kabel Power ) dari panel existing ke PP.1 NYY 3X10 mm2 + bc 6mm2)
62.00 m1 100,219.00 6,213,578.00 0.320 62.00 m1 100,219.00 6,213,578.00 0.320 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
I PEKERJAAN PLUMBING
1 Pemasangan &pengadaan Wastafel type America Standart 4.00 bh 1,048,797.50 4,195,190.00 0.216 4.00 bh 1,048,797.50 4,195,190.00 0.216 0.00 bh bh 0.00 bh 0.000 0.000 0.000 Rp -
2 Instalasi Air bersih pipa PPR-PN.10 Dia.1 in 104.00 m1 43,962.98 4,572,149.40 0.236 104.00 m1 43,962.98 4,572,149.40 0.236 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
3 Instalasi Air bersih pipa PPR-PN.10 Dia.3/4 in 16.00 m1 37,152.10 594,433.60 0.031 16.00 m1 37,152.10 594,433.60 0.031 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
4 Instalasi Air kotor pipa PVC-AW Dia.3 in 26.00 m1 118,882.60 3,090,947.60 0.159 26.00 m1 118,882.60 3,090,947.60 0.159 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
5 Instalasi Air kotor pipa PVC-AW Dia.1,5 in 16.00 m1 57,584.73 921,355.60 0.048 16.00 m1 57,584.73 921,355.60 0.048 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
LAPORAN MINGGUAN KEMAJUAN PEKERJAAN

TANGGAL : 23 Oktober 2023 - 29 Oktober 2023


PROGRAM : PENGEMBANGAN PERDAGANGN DALAM NEGERI MINGGU : XIII (TIGA BELAS)
KEGIATAN : BIAYA KONTRUKSI FISIK PASAR SIDAYU SUMBER DANA APBN Kementrian Perdagangan Direktorat Jenderal Perdagangan Dalam Negeri)
LOKASI : DESA MRIYUNAN KECAMATAN SIDAYU KABUPATEN GRESIK NOMOR KONTRAK 027/465/SPK/437.56/2023
KONTRAKTOR PELAKSANA : CV. JATI JAYA TANGGAL KONTRAK 31 Juli 2023
KONSULTAN PENGAWAS : CV. MEGA KARYA PRATAMA PEKERJAAN DIMULAI 01 Agustus 2023
NILAI KONTRAK : Rp.2,152,000,000.00 DAN AKHIR 28 November 2023

KEMAJUAN TINGKAT
VOLUME HARGA JUMLAH BOBOT VOLUME HARGA JUMLAH BOBOT VOLUME VOLUME TOTAL FISIK TAHAP PENYELESAIAN
NO KONTRAK SATUAN HARGA FISIK MC0-CCO SATUAN HARGA FISIK MINGGU MINGGU VOLUME MINGGU PENYELESAIAN SELURUH KEUANGAN
( Rp ) ( Rp ) (%) ( Rp ) ( Rp ) (%) LALU INI INI PEKERJAAN PEKERJAAN
(%) (%) (%)
1 3 4 4 5.000 3 4 4 5 6 7 8 9 10 11 12
J PEKERJAAN SISTEM PEMADAM KEBAKARAN
1 APAR 6 Kg + Braket dinding 4.00 bh 592,250.00 2,369,000.00 0.122 4.00 bh 592,250.00 2,369,000.00 0.122 0.00 bh bh 0.00 bh 0.000 0.000 0.000 Rp -
K PEKERJAAN LAIN - LAIN
1 Urugan Pasir T. 10cm 7.36 m3 222,480.00 1,637,452.80 0.084 9.65 m3 222,480.00 2,146,932.00 0.111 0.00 m3 m3 0.00 m3 0.000 0.000 0.000 Rp -
2 Saluran U-Dict 40 195.80 m1 307,231.23 60,155,875.32 3.103 196.80 m1 307,231.23 60,463,106.56 3.119 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
3 Tutup U-Dict 40 195.80 m1 221,414.21 43,352,901.83 2.236 196.80 m1 221,414.21 43,574,316.04 2.248 0.00 m1 m1 0.00 m1 0.000 0.000 0.000 Rp -
4 Pekerjaan Pengadaan Logo Pasar Uk. 1200x2400x2,5 mm + Lampu (Signboard) 1.00 bh 861,414.75 861,414.75 0.044 1.00 bh 861,414.75 861,414.75 0.044 0.00 bh bh 0.00 bh 0.000 0.000 0.000 Rp -
5 Signed zonasi 6.00 bh 95,500.00 573,000.00 0.030 6.00 bh 95,500.00 573,000.00 0.030 0.00 bh bh 0.00 bh 0.000 0.000 0.000 Rp -

JUMLAH 1,938,738,738.74 100.000 1,938,738,738.74 100.000 2.734 65.549 Rp 1,268,199,773.50


PPN 11% 213,261,261.26 213,261,261.26 Rp 139,501,975.08
JUMLAH TOTAL 2,152,000,000.00 2,152,000,000.00 Rp 1,407,701,748.58
RENCANA TIAP MINGGU (%) 10.283 %
KUMULATIF RENCANA TIAP MINGGU (%) 70.447 %
REALISASI TIAP MINGGU (%) 2.734 %
KUMULATIF REALISASI TIAP MINGGU (%) 65.549 %
DEVIASI -4.898 %

Gresik, 30 Oktober 2023


Mengetahui oleh: Di setujui oleh: Diperiksa oleh: Dibuat Oleh :
Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas KONTRAKTOR
Dinas Koperasi, Usaha Mikro, Perindustrian, dan Perdagangan Kabupaten Gresik Dinas Koperasi, Usaha Mikro, Perindustrian, dan Perdagangan Kabupaten Gresik CV. Mega Karya Pratama CV. JATI JAYA

(Dr. FRANSISKA DYAH AYU PUSPITASARI, S.Psi,M.M.) MU'ANAN,S,H (SYARIFUDDIN, ST) (DWI RIZKY JATI KUSUMO)
NIP. 198203072005012011 NIP. 197206052007011051 Direktur Direktur