KONTRAK V0LUME TAMBAH KURANG VOLUME NEGOSIASI HASIL MUTUAL CHEK NOL (MC 0)
NO. URAIAN PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME BOBOT (%) VOLUME VOLUME
( Rp. ) ( Rp. ) TAMBAH (+) KURANG (-) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4 5 6 7 8 9 10 10 11 12 13 14

I. PEKERJAAN PERSIAPAN 42,800,000,00 0,92 42,800,000,00

1,1 Mobilisasi dan Demobilisasi Ls 1,00 30,800,000,00 30,800,000,00 0,66 - - 1,00 30,800,000,00 30,800,000,00 1,00 30,800,000,000 30,800,000,00
1,2 Kegiatan Penyelenggaraan SMK3 Konstruksi Ls 1,00 12,000,000,00 12,000,000,00 0,26 - - 1,00 12,000,000,00 12,000,000,00 1,00 12,000,000,000 12,000,000,00

II. PEKERJAAN TANAH 1,145,151,672,67 24,45 1,014,466,932,93

2,1 Galian Tanah Biasa dengan Alat M³ 6,531,00 24,251,56 158,386,942,63 3,38 4,765,77 24,251,56 1,765,23 24,251,56 42,809,582,41
2,2 Timbunan Tanah Didatangkan M³ 5,730,00 121,742,96 697,587,151,06 14,89 121,742,96 5,730,00 121,742,96 697,587,151,06
2.2a *Timbunan Tanah Didatangkan M³ 644,07 644,07 121,742,96 78,410,987,15 644,07 121,742,96 78,410,987,15
2,3 Timbunan Sirtu M³ 2,336,40 123,770,58 289,177,578,98 6,17 1,326,23 123,770,58 1,010,17 123,770,58 125,029,325,01
2,4 Timbunan Tanah Hasil Galian M³ 1,747,54 1,747,54 40,416,75 70,629,887,30 1,747,54 40,416,75 70,629,887,30

III. PEKERJAAN PASANGAN 3,429,915,178,27 73,23 3,055,290,695,55

3,1 Pasangan Batu Kali M³ 2,325,20 1,034,255,70 2,404,851,348,34 51,35 1,034,255,70 2,325,20 1,034,255,70 2,404,851,348,34
3.1a *Pasangan Batu Kali 1 : 4 M³ 187,38 187,38 1,034,255,70 193,798,832,64 187,38 1,034,255,70 193,798,832,64
3..2 Siaran M² 5,593,33 68,488,14 383,076,751,93 8,18 5,593,33 68,488,14 68,488,14 0,00
3,3 Plesteran M² 3,858,33 63,846,39 246,340,441,93 5,26 63,846,39 3,858,33 63,846,39 246,340,441,93
3.3a *Plesteran M² 527,83 527,83 1,034,255,70 545,911,184,93 527,83 63,846,39 33,700,040,03
3,4 Pipa ( Drain Holle ) M' 2,360,00 25,098,75 59,233,050,00 1,26 2,270,67 25,098,75 89,33 25,098,75 2,242,071,34
3,5 Bronjong Pabrikasi Dia. 3 M³ 333,35 867,522,38 289,188,586,08 6,17 270,35 867,522,38 63,00 867,522,38 54,653,910,07
3,6 Penetrasi Tiang Pancang Kayu atau Dolken Dia. 8-10 cm M' 188,90 250,000,00 47,225,000,00 1,01 250,000,00 188,90 250,000,00 47,225,000,00
3.6a Penetrasi Tiang Pancang Kayu atau Dolken Dia. 8-10 cm M' 75,10 75,10 250,000,00 18,775,000,00 75,10 250,000,00 18,775,000,00
3,7 Tebas Tebang M² 5,760,00 5,760,00 9,323,62 53,704,051,20 5,760,00 9,323,62 53,704,051,20

IV. PEKERJAAN BANGUNAN 65,705,876,33 1,40 571,015,132,44

4,1 Galian Tanah Biasa Dengan Alat M³ 78,33 24,251,56 1,899,624,75 0,04 24,251,56 78,33 24,251,56 1,899,624,75
4.1a *Galian Tanah Biasa dengan Alat M³ 7,03 7,03 24,251,56 170,488,47 7,03 24,251,56 170,488,47
4,2 Pasangan Batu Kali 1 : 4 M³ 17,84 1,034,255,70 18,451,121,65 0,39 1,034,255,70 17,84 1,034,255,70 18,451,121,65
4.2a *Pasangan Batu Kali 1 : 4 M³ 285,28 285,28 1,034,255,70 295,052,465,45 285,28 1,034,255,70 295,052,465,45
4,3 Siaran 1 : 2 M² 55,95 68,488,14 3,831,911,27 0,08 68,488,14 55,95 68,488,14 3,831,911,27
4.3a *Siaran 1 : 2 M² 212,05 212,05 68,488,14 14,522,909,47 212,05 68,488,14 14,522,909,47
4,4 Plesteran M² 30,84 63,846,39 1,969,022,67 0,04 63,846,39 30,84 63,846,39 1,969,022,67
4.4a *Plesteran M² 319,95 319,95 63,846,39 20,427,652,48 319,95 63,846,39 20,427,652,48
4,5 Pintu Sorong b = 0,80 m , h = 1,00 m Bh 1,00 12,069,915,00 12,069,915,00 0,26 12,069,915,00 1,00 12,069,915,00 12,069,915,00
4,6 Pintu Sorong b = 0,30 m , h = 1,00 m Bh 3,00 9,161,427,00 27,484,281,00 0,59 9,161,427,00 3,00 9,161,427,00 27,484,281,00
4,7 Pembesian Kg 690,02 690,02 23,537,64 16,241,442,35 690,02 23,537,64 16,241,442,35
4,8 Bekisting M² 26,74 26,74 135,498,06 3,623,218,12 26,74 135,498,06 3,623,218,12
4,9 Beton K.175 M³ 5,38 5,38 1,140,253,02 6,134,561,25 5,38 1,140,253,02 6,134,561,25
4.10 Beton Cyclope M³ 17,56 17,56 963,895,27 16,926,000,94 17,56 963,895,27 16,926,000,94
4,11 Pengadaan dan Pemasangan Pipa Baja Dia.16" M' 36,00 36,00 2,969,536,32 106,903,307,52 36,00 2,969,536,32 106,903,307,52
4,12 Pemasangan Numenklatur Bh 7,00 7,00 221,587,75 1,551,114,25 7,00 221,587,75 1,551,114,25
4,13 Dewatering Ls 1,00 1,00 23,756,095,80 23,756,095,80 1,00 23,756,095,80 23,756,095,80

JUMLAH HARGA KONSTRUKSI Rp. 4,683,572,727,27 100,00 4,683,572,760,92


PPN 10% Rp. 468,357,272,73 468,357,276,09
TOTAL HARGA Rp. 5,151,930,000,00 5,151,930,000,00
DIBULATKAN Rp. 5,151,930,000,00 5,151,930,000,00

Panitia Peneliti Pelaksanaan Kontrak Pengawas Lapangan


Irigasi Dan Rawa I
NO NAMA JABATAN TANDA TANGAN
NO. NAMA JABATAN TANDA TANGAN

RAHMAN KALOAN Pengawas 1. .............................


1
NIP. 19700914 200911 1 001 Lapangan
1 Drs. Edison, ST.MT Ketua
NIP. 19670105 199803 1 007 1. ..........................................................................
Konsultan Supervisi
2 Benyamin R. Tanga, ST Sekertaris CV. STB 64
NIP. 19761016 201410 1 001 2. .................................................. NO NAMA JABATAN TANDA TANGAN

3 Zulyana Tandju, ST., MT Anggota 2 NASIKUN, ST Team Leader 2. .............................


NIP. 19720717 200003 2 007 3. ..........................................................................
Penyedia Jasa:
4 Andi Anugrah Pratama, ST Anggota CV. SAMBULUGANA
NIP. 19880808 201802 1 001 4. ................................................... NO NAMA JABATAN TANDA TANGAN

OVID RIANSYAH 3. .............................


5 Irfan Ibrahim, ST Anggota 3 Direktur
NIP. 19840510 201802 1 001 5. .........................................................................

Anda mungkin juga menyukai