Anda di halaman 1dari 11

REALISASI KEMAJUAN PROGRESS FISIK

MINGGUAN
SATUAN KERJA : KEMENTRIAN PENDIDIKAN, KEBUDAYAAN, RISET & TEKNOLOGI
PEKERJAAN : PEKERJAAN PEMBANGUNAN GEDUNG KULIAH TERPADU UNIVERSITAS KHAIRUN TERNATE PERIODE : 20 Maret 2024 S.D 26 Maret 2024
LOKASI : UNIVERSITAS KHAIRUN TERNATE - KOTA TERNATE BULAN MINGGU KE -
PROGRESS
15,04 %
M10
SUMBER DANA/TA : APBN 2024 (SBSN)
: MARET 2024 REALISASI
KONTRAKTOR : PT. HAKA Utama
No. KONTRAK : 019/UN44.U3.PPK-SBSN/SP/2024, Tanggal 17 Januari 2024 REALISASI : 15,04 %
No. KONTRAK ADD - 1 : - RENCANA : 11,63 %
KONSULTAN SUPERVISI : PT. ARCI PRATAMA KONS. KSO. PT. BARUGA BULAENG INDOTAMA DEVIASI : 3,41 % ( Positif )
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
I PEKERJAAN PERSIAPAN 605.389.104,00 217.298.354,00 47.091.550,00 264.389.904,00
1 Pekerjaan Papan Nama Proyek ls 1,00 500.000,00 500.000,00 0,001 % 1,00 500.000,00 0,001 - - - 1,00 500.000,00 0,001 % 100,00
2 Pekerjaan Pengukuran dan Pemasangan bowplank m' 129,20 87.745,00 11.336.654,00 0,025 % 129,20 11.336.654,00 0,025 - - - 129,20 11.336.654,00 0,025 % 100,00
3 Pembuatan Laporan & Dokumentasi ls 1,00 16.500.000,00 16.500.000,00 0,037 % 0,35 5.775.000,00 0,013 0,15 2.475.000,00 0,006 0,50 8.250.000,00 0,018 % 50,00
4 Shop drawing dan as-built drawing ls 1,00 10.000.000,00 10.000.000,00 0,022 % 0,35 3.500.000,00 0,008 0,15 1.500.000,00 0,003 0,50 5.000.000,00 0,011 % 50,00
5 Setting-out ls 1,00 6.150.000,00 6.150.000,00 0,014 % 1,00 6.150.000,00 0,014 - - - 1,00 6.150.000,00 0,014 % 100,00
6 Pengujian Material ls 1,00 101.700.000,00 101.700.000,00 0,226 % 0,35 35.595.000,00 0,079 0,30 30.510.000,00 0,068 0,65 66.105.000,00 0,147 % 65,00
JMD Mutu K-300 & K-175 (Mix design)
Kuat tekan beton
Kuat tarik baja tulangan
Kuat tarik baja pipa BSP
CBR Lapangan/laboratorium
7 Listrik & air kerja ls 1,00 24.500.000,00 24.500.000,00 0,054 % 0,50 12.250.000,00 0,027 0,10 2.450.000,00 0,005 0,60 14.700.000,00 0,033 % 60,00
8 SMK3 Konstruksi ls 1,00 203.131.000,00 203.131.000,00 0,452 % 0,70 142.191.700,00 0,316 0,05 10.156.550,00 0,023 0,75 152.348.250,00 0,339 % 75,00
Penyiapan RK3K
Sosialisasi dan Promosi K3
Alat Pelindung Kerja
Alat Pelindung Diri
Asuransi Dan Perijinan
Personil K3
Fasilitas sarana kesehatan
Rambu-Rambu
Lain- Lain Terkait Pengendalian Risiko K3
9 Direksi Kit m2 24,00 450.000,00 10.800.000,00 0,024 % 24,00 10.800.000,00 0,024 - - - 24,00 10.800.000,00 0,024 % 100,00
10 Gudang Material m2 20,00 520.822,50 10.416.450,00 0,023 % 20,00 10.416.450,00 0,023 - - - 20,00 10.416.450,00 0,023 % 100,00
11 Mobilisasi dan Demobilisasi ls 1,00 81.500.000,00 81.500.000,00 0,181 % 0,50 40.750.000,00 0,091 - - - 0,50 40.750.000,00 0,091 % 50,00
12 Pembersihan awal & akhir ls 1,00 25.000.000,00 25.000.000,00 0,056 % 0,50 12.500.000,00 0,028 - - - 0,50 12.500.000,00 0,028 % 50,00
13 Pagar keliling, tinggi 2 m, seng gelombang 0.2 mm (baru) m 150,00 595.700,00 89.355.000,00 0,199 % 150,00 89.355.000,00 0,199 - - - 150,00 89.355.000,00 0,199 % 100,00
14 Pekerjaan climbing wall
a. Pembongkaran climbing wall ls 1,00 2.000.000,00 2.000.000,00 0,004 % 1,00 2.000.000,00 0,004 - - - 1,00 2.000.000,00 0,004 % 100,00
b. Pemasangan kembali climbing wall, termasuk pondasi ls 1,00 7.500.000,00 7.500.000,00 0,017 % - - - - - - - - 0,000 % -
15 Persetujuan Bangunan Gedung (PBG) ls 1,00 5.000.000,00 5.000.000,00 0,011 % - - - - - - - - 0,000 % -
II PEKERJAAN STRUKTUR 15.647.097.794,20 967.761.278,20 - 967.761.278,20
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
A PEKERJAAN TANAH & PONDASI 1.120.969.061,11
1 Pekerjaan tanah
a Cut & fill lahan, mekanis m3 1.419,25 118.162,50 167.702.128,13 0,373 % 1.419,25 167.702.128,13 0,373 - - - 1.419,25 167.702.128,13 0,373 % 100,00
b Urugan tanah dalam site & bangunan, timbunan kembali m3 495,00 86.825,00 42.978.375,00 0,096 % 495,00 42.978.375,00 0,096 - - - 495,00 42.978.375,00 0,096 % 100,00
c Pemadatan tanah dalam site & bangunan m3 495,00 86.825,00 42.978.375,00 0,096 % 495,00 42.978.375,00 0,096 - - - 495,00 42.978.375,00 0,096 % 100,00
d Urugan pasir peninggian elevasi lantai basement ke +0.00 m3 29,56 422.912,50 12.500.870,59 0,028 % - - - - - - - - 0,000 % -
2 Pondasi poer pelat
a Galian tanah keras, semi mekanis m3 276,14 118.162,50 32.629.333,67 0,073 % 276,14 32.629.333,67 0,073 - - - 276,14 32.629.333,67 0,073 % 100,00
b Pasir urug padat, 5 cm m3 9,15 422.912,50 3.870.706,66 0,009 % 9,15 3.870.706,66 0,009 - - - 9,15 3.870.706,66 0,009 % 100,00
c Rabat beton m3 7,54 1.395.713,93 10.518.798,02 0,023 % 7,54 10.518.798,02 0,023 - - - 7,54 10.518.798,02 0,023 % 100,00
d Bekisting m2 163,24 189.911,00 31.001.071,64 0,069 % 163,24 31.001.071,64 0,069 - - - 163,24 31.001.071,64 0,069 % 100,00
e Besi Tulangan D 16 kg 10.057,02 20.139,38 202.542.072,03 0,450 % 10.057,02 202.542.072,03 0,450 - - - 10.057,02 202.542.072,03 0,450 % 100,00
f Beton f'c 25 MPa m3 80,89 1.917.323,54 155.094.218,13 0,345 % 80,89 155.094.218,13 0,345 - - - 80,89 155.094.218,13 0,345 % 100,00
3 Dinding penahan tanah
a Galian tanah keras kaki pondasi, semi mekanis m3 55,10 104.491,88 5.757.687,79 0,013 % 49,59 5.181.919,01 0,012 - - - 49,59 5.181.919,01 0,012 % 90,00
b Pasir urug padat, 5 cm m3 6,14 422.912,50 2.594.584,68 0,006 % 5,52 2.335.126,21 0,005 - - - 5,52 2.335.126,21 0,005 % 90,00
c Pasangan pondasi batu kali, campuran 1 SP : 4 PP m3 185,44 1.122.716,25 208.198.915,24 0,463 % 166,90 187.379.023,72 0,417 - - - 166,90 187.379.023,72 0,417 % 90,00
d Plesteran batu kali , 1 SP : 4 PP tebal 15 mm m2 239,44 105.601,05 25.284.587,41 0,056 % - - - - - - - - 0,000 % -
4 Pondasi batu kali ramp & sisi luar tangga site
a Pasir urug padat, 5 cm m3 4,43 422.912,50 1.871.810,73 0,004 % 3,10 1.310.267,51 0,003 - - - 3,10 1.310.267,51 0,003 % 70,00
b Pasangan pondasi batu kali, campuran 1 SP : 4 PP m3 104,64 1.122.716,25 117.485.519,27 0,261 % 73,25 82.239.863,49 0,183 - - - 73,25 82.239.863,49 0,183 % 70,00
5 Pondasi dudukan tangki air
a Pasir urug padat, 5 cm m3 1,59 422.912,50 671.585,05 0,001 % - - - - - - - - 0,000 % -
b Pasangan pondasi batu kali, campuran 1 SP : 4 PP m3 13,66 1.122.716,25 15.335.181,26 0,034 % - - - - - - - - 0,000 % -
c Urugan tanah m3 10,33 250.412,50 2.585.509,06 0,006 % - - - - - - - - 0,000 % -
d Pelat lantai 15 cm
1) Bekisting m2 2,70 361.669,25 976.506,98 0,002 % - - - - - - - - 0,000 % -
2) Tulangan utama Ø10 kg 142,74 20.139,38 2.874.596,96 0,006 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 2,44 1.917.323,54 4.673.476,12 0,010 % - - - - - - - - 0,000 % -
e Sloef/balok landasan 30x50 cm
1) Bekisting 2x Pakai m2 17,50 194.223,50 3.398.911,25 0,008 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 kg 268,74 20.139,38 5.412.194,69 0,012 % - - - - - - - - 0,000 % -
3) Tulangan badan D13 kg 41,94 20.139,38 844.562,24 0,002 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø10 kg 130,50 20.139,38 2.628.202,94 0,006 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa m3 2,63 1.917.323,54 5.032.974,28 0,011 % - - - - - - - - 0,000 % -
f Baja CNP 100x50x5 mm, fin cat kg 353,50 38.263,95 13.526.306,33 0,030 % - - - - - - - - 0,000 % -
B PEKERJAAN TIE BEAM, SLOEF 589.183.556,94
1 Tie Beam TB1-1 40 x 70 cm
a Urugan pasir padat 5 cm m3 6,18 422.912,50 2.615.290,90 0,006 % 6,18 2.615.290,90 0,006 - - - 6,18 2.615.290,90 0,006 % 100,00
b Lantai kerja 5 cm m3 6,18 1.395.713,93 8.631.094,93 0,019 % 6,18 8.631.094,93 0,019 - - - 6,18 8.631.094,93 0,019 % 100,00
c Bekisting m2 432,88 273.263,00 118.290.087,44 0,263 % 432,88 118.290.087,44 0,263 - - - 432,88 118.290.087,44 0,263 % 100,00
d Tulangan utama D19 kg 10.287,76 20.139,38 207.189.121,70 0,461 % 10.287,76 207.189.121,70 0,461 - - - 10.287,76 207.189.121,70 0,461 % 100,00
e Tulangan badan D13 kg 740,95 20.139,38 14.922.208,21 0,033 % 740,95 14.922.208,21 0,033 - - - 740,95 14.922.208,21 0,033 % 100,00
f Tulangan sengkang Ø10 kg 3.552,32 20.139,38 71.541.551,32 0,159 % 3.552,32 71.541.551,32 0,159 - - - 3.552,32 71.541.551,32 0,159 % 100,00
g Beton f'c 25 MPa m3 86,58 1.917.323,54 165.994.202,43 0,369 % 86,58 165.994.202,43 0,369 - - - 86,58 165.994.202,43 0,369 % 100,00
C PEKERJAAN KOLOM 3.766.908.800,63
1 Pekerjaan Kolom Lantai Basement
a Kolom K1a 60x80 cm
1) Bekisting 2x Pakai m2 579,60 273.263,00 158.383.234,80 0,352 % 579,60 158.383.234,80 0,352 - - - 579,60 158.383.234,80 0,352 % 100,00
2) Tulangan utama D 22 kg 15.736,88 20.139,38 316.930.880,12 0,705 % 15.736,88 316.930.880,12 0,705 - - - 15.736,88 316.930.880,12 0,705 % 100,00
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
3) Tulangan sengkang D 13 kg 7.587,84 20.139,38 152.814.356,77 0,340 % 7.587,84 152.814.356,77 0,340 - - - 7.587,84 152.814.356,77 0,340 % 100,00
4) Beton f'c 25 MPa m3 99,36 1.917.323,54 190.505.266,51 0,424 % 99,36 190.505.266,51 0,424 - - - 99,36 190.505.266,51 0,424 % 100,00
b Kolom K3 60 x 60 cm
1) Bekisting 2x Pakai m2 23,52 273.263,00 6.427.145,76 0,014 % 23,52 6.427.145,76 0,014 - - - 23,52 6.427.145,76 0,014 % 100,00
2) Tulangan utama D 22 kg 794,90 20.139,38 16.008.795,31 0,036 % 794,90 16.008.795,31 0,036 - - - 794,90 16.008.795,31 0,036 % 100,00
3) Tulangan sengkang D 13 kg 282,89 20.139,38 5.697.280,46 0,013 % 282,89 5.697.280,46 0,013 - - - 282,89 5.697.280,46 0,013 % 100,00
4) Beton f'c 25 MPa m3 3,53 1.917.323,54 6.764.317,43 0,015 % 3,53 6.764.317,43 0,015 - - - 3,53 6.764.317,43 0,015 % 100,00
c Kolom K4 50 x 50 cm
1) Bekisting 2x Pakai m2 24,00 273.263,00 6.558.312,00 0,015 % 24,00 6.558.312,00 0,015 - - - 24,00 6.558.312,00 0,015 % 100,00
2) Tulangan utama D 19 kg 537,70 20.139,38 10.828.871,53 0,024 % 537,70 10.828.871,53 0,024 - - - 537,70 10.828.871,53 0,024 % 100,00
3) Tulangan sengkang D 13 kg 330,57 20.139,38 6.657.458,55 0,015 % 330,57 6.657.458,55 0,015 - - - 330,57 6.657.458,55 0,015 % 100,00
4) Beton f'c 25 MPa m3 3,00 1.917.323,54 5.751.970,61 0,013 % 3,00 5.751.970,61 0,013 - - - 3,00 5.751.970,61 0,013 % 100,00
d Kolom K6 L 50 x 25 x 25 cm
1) Bekisting 2x Pakai m2 36,00 273.263,00 9.837.468,00 0,022 % 36,00 9.837.468,00 0,022 - - - 36,00 9.837.468,00 0,022 % 100,00
2) Tulangan utama D 19 kg 1.008,18 20.139,38 20.304.134,12 0,045 % 1.008,18 20.304.134,12 0,045 - - - 1.008,18 20.304.134,12 0,045 % 100,00
3) Tulangan sengkang D 13 kg 368,83 20.139,38 7.427.951,10 0,017 % 368,83 7.427.951,10 0,017 - - - 368,83 7.427.951,10 0,017 % 100,00
4) Beton f'c 25 MPa m3 3,38 1.917.323,54 6.470.966,93 0,014 % 3,38 6.470.966,93 0,014 - - - 3,38 6.470.966,93 0,014 % 100,00
e Kolom praktis m' 160,03 124.970,50 19.998.404,26 0,044 % - - - - - - - - 0,000 % -
f Corner guard besi siku 50x50x5 mm, T=1.2 m, fin cat kg 288,00 36.610,83 10.543.917,60 0,023 % - - - - - - - - 0,000 % -
2 Pekerjaan Kolom Lantai 1
a Kolom K1a 60x80 cm
1) Bekisting 2x Pakai m2 403,20 273.263,00 110.179.641,60 0,245 % 403,20 110.179.641,60 0,245 - - - 403,20 110.179.641,60 0,245 % 100,00
2) Tulangan utama D 22 kg 10.956,73 20.139,38 220.661.773,19 0,491 % 10.956,73 220.661.773,19 0,491 - - - 10.956,73 220.661.773,19 0,491 % 100,00
3) Tulangan sengkang D 13 kg 4.831,01 20.139,38 97.293.569,71 0,216 % 4.831,01 97.293.569,71 0,216 - - - 4.831,01 97.293.569,71 0,216 % 100,00
4) Beton f'c 25 MPa m3 69,12 1.917.323,54 132.525.402,79 0,295 % 69,12 132.525.402,79 0,295 - - - 69,12 132.525.402,79 0,295 % 100,00
b Kolom K4 50 x 50 cm
1) Bekisting 2x Pakai m2 16,00 273.263,00 4.372.208,00 0,010 % 16,00 4.372.208,00 0,010 - - - 16,00 4.372.208,00 0,010 % 100,00
2) Tulangan utama D 19 kg 352,53 20.139,38 7.099.723,72 0,016 % 352,53 7.099.723,72 0,016 - - - 352,53 7.099.723,72 0,016 % 100,00
3) Tulangan sengkang D 13 kg 201,71 20.139,38 4.062.291,90 0,009 % 201,71 4.062.291,90 0,009 - - - 201,71 4.062.291,90 0,009 % 100,00
4) Beton f'c 25 MPa m3 2,00 1.917.323,54 3.834.647,07 0,009 % 2,00 3.834.647,07 0,009 - - - 2,00 3.834.647,07 0,009 % 100,00
c Kolom K6 L 50 x 25 x 25 cm
1) Bekisting 2x Pakai m2 2,25 273.263,00 614.841,75 0,001 % 2,25 614.841,75 0,001 - - - 2,25 614.841,75 0,001 % 100,00
2) Tulangan utama D 19 kg 660,99 20.139,38 13.311.981,97 0,030 % 660,99 13.311.981,97 0,030 - - - 660,99 13.311.981,97 0,030 % 100,00
3) Tulangan sengkang D 13 kg 243,80 20.139,38 4.910.001,58 0,011 % 243,80 4.910.001,58 0,011 - - - 243,80 4.910.001,58 0,011 % 100,00
4) Beton f'c 25 MPa m3 2,25 1.917.323,54 4.313.977,96 0,010 % 2,25 4.313.977,96 0,010 - - - 2,25 4.313.977,96 0,010 % 100,00
e Kolom praktis m' 241,93 124.970,50 30.233.488,21 0,067 % - - - - - - - - 0,000 % -
3 Pekerjaan Kolom Lantai 2
a Kolom K1a 60x80 cm
1) Bekisting 2x Pakai m2 403,20 273.263,00 110.179.641,60 0,245 % - - - - - - - - 0,000 % -
2) Tulangan utama D 22 kg 10.956,73 20.139,38 220.661.773,19 0,491 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 4.831,01 20.139,38 97.293.569,71 0,216 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 69,12 1.917.323,54 132.525.402,79 0,295 % - - - - - - - - 0,000 % -
b Kolom K4 50 x 50 cm
1) Bekisting 2x Pakai m2 16,00 273.263,00 4.372.208,00 0,010 % - - - - - - - - 0,000 % -
2) Tulangan utama D 19 kg 352,53 20.139,38 7.099.723,72 0,016 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 201,71 20.139,38 4.062.291,90 0,009 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 2,00 1.917.323,54 3.834.647,07 0,009 % - - - - - - - - 0,000 % -
c Kolom K6 L 50 x 25 x 25 cm
1) Bekisting 2x Pakai m2 24,00 273.263,00 6.558.312,00 0,015 % - - - - - - - - 0,000 % -
2) Tulangan utama D 22 kg 660,99 20.139,38 13.311.981,97 0,030 % - - - - - - - - 0,000 % -
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
3) Tulangan sengkang D 13 kg 243,80 20.139,38 4.910.001,58 0,011 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 2,25 1.917.323,54 4.313.977,96 0,010 % - - - - - - - - 0,000 % -
d Kolom praktis m' 252,23 124.970,50 31.520.684,36 0,070 % - - - - - - - - 0,000 % -
4 Pekerjaan Kolom Lantai 3
a Kolom K1a 60x80 cm
1) Bekisting 2x Pakai m2 403,20 273.263,00 110.179.641,60 0,245 % - - - - - - - - 0,000 % -
2) Tulangan utama D 22 kg 10.956,73 20.139,38 220.661.773,19 0,491 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 4.831,01 20.139,38 97.293.569,71 0,216 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 69,12 1.917.323,54 132.525.402,79 0,295 % - - - - - - - - 0,000 % -
b Kolom K5 40 x 40 cm
1) Bekisting 2x Pakai m2 12,80 273.263,00 3.497.766,40 0,008 % - - - - - - - - 0,000 % -
2) Tulangan utama D 19 kg 264,40 20.139,38 5.324.792,79 0,012 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 157,03 20.139,38 3.162.544,61 0,007 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 1,28 1.917.323,54 2.454.174,13 0,005 % - - - - - - - - 0,000 % -
c Kolom K6 L 50 x 25 x 25 cm
1) Bekisting 2x Pakai m2 2,25 273.263,00 614.841,75 0,001 % - - - - - - - - 0,000 % -
2) Tulangan utama D 22 kg 264,40 20.139,38 5.324.792,79 0,012 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 157,03 20.139,38 3.162.544,61 0,007 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 1,28 1.917.323,54 2.454.174,13 0,005 % - - - - - - - - 0,000 % -
d Kolom praktis m' 252,23 124.970,50 31.520.684,36 0,070 % - - - - - - - - 0,000 % -
5 Pekerjaan Kolom Lantai 4
a Kolom K1b 60x80 cm
1) Bekisting 2x Pakai m2 504,00 273.263,00 137.724.552,00 0,306 % - - - - - - - - 0,000 % -
2) Tulangan utama D 22 kg 11.773,12 20.139,38 237.103.238,64 0,527 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 6.038,77 20.139,38 121.616.962,14 0,270 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 86,40 1.917.323,54 165.656.753,49 0,368 % - - - - - - - - 0,000 % -
b Kolom K5 40 x 40 cm
1) Bekisting 2x Pakai m2 16,00 273.263,00 4.372.208,00 0,010 % - - - - - - - - 0,000 % -
2) Tulangan utama D 19 kg 317,81 20.139,38 6.400.508,50 0,014 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 194,04 20.139,38 3.907.857,67 0,009 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 1,60 1.917.323,54 3.067.717,66 0,007 % - - - - - - - - 0,000 % -
c Kolom K6 L 50 x 25 x 25 cm
1) Bekisting 2x Pakai m2 30,00 273.263,00 8.197.890,00 0,018 % - - - - - - - - 0,000 % -
2) Tulangan utama D 22 kg 794,53 20.139,38 16.001.271,26 0,036 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 300,06 20.139,38 6.043.078,86 0,013 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 2,81 1.917.323,54 5.392.472,44 0,012 % - - - - - - - - 0,000 % -
d Kolom praktis m' 329,93 124.970,50 41.230.892,21 0,092 % - - - - - - - - 0,000 % -
6 Pekerjaan Kolom Top Floor
a Kolom K2 50x70 cm
1) Bekisting 2x Pakai m2 129,60 273.263,00 35.414.884,80 0,079 % - - - - - - - - 0,000 % -
2) Tulangan utama D 22 kg 1.666,50 20.139,38 33.562.330,31 0,075 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 1.552,83 20.139,38 31.272.933,12 0,070 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 18,90 1.917.323,54 36.237.414,83 0,081 % - - - - - - - - 0,000 % -
b Kolom K5 40 x 40 cm
1) Bekisting 2x Pakai m2 9,60 273.263,00 2.623.324,80 0,006 % - - - - - - - - 0,000 % -
2) Tulangan utama D 19 kg 210,98 20.139,38 4.249.077,07 0,009 % - - - - - - - - 0,000 % -
3) Tulangan sengkang D 13 kg 117,02 20.139,38 2.356.800,76 0,005 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 0,96 1.917.323,54 1.840.630,59 0,004 % - - - - - - - - 0,000 % -
c Kolom praktis m' 99,95 124.970,50 12.490.801,48 0,028 % - - - - - - - - 0,000 % -
D PEKERJAAN BALOK 5.102.294.893,44
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
1 Pekerjaan Balok Lantai Basement
a Balok latei 1 - 12x12 cm
1) Bekisting 2x Pakai M2 12,01 307.475,50 3.692.657,76 0,008 % 12,01 3.692.657,76 0,008 - - - 12,01 3.692.657,76 0,008 % 100,00
2) Tulangan utama Ø10 Kg 86,38 20.139,38 1.739.620,04 0,004 % 86,38 1.739.620,04 0,004 - - - 86,38 1.739.620,04 0,004 % 100,00
3) Tulangan sengkang Ø6 Kg 19,89 20.139,38 400.488,07 0,001 % 19,89 400.488,07 0,001 - - - 19,89 400.488,07 0,001 % 100,00
4) Beton f'c 14,5 MPa M3 0,48 1.560.202,90 749.496,51 0,002 % 0,48 749.496,51 0,002 - - - 0,48 749.496,51 0,002 % 100,00
2 Pekerjaan Balok Lantai 1
a Balok B1 - 40 x 70 cm
1) Bekisting 2x Pakai M2 555,30 307.475,50 170.741.145,15 0,380 % 555,30 170.741.145,15 0,380 - - - 555,30 170.741.145,15 0,380 % 100,00
2) Tulangan utama D19 Kg 10.659,26 20.139,38 214.670.836,55 0,477 % 10.659,26 214.670.836,55 0,477 - - - 10.659,26 214.670.836,55 0,477 % 100,00
3) Tulangan badan D19 Kg 1.579,15 20.139,38 31.803.086,90 0,071 % 1.579,15 31.803.086,90 0,071 - - - 1.579,15 31.803.086,90 0,071 % 100,00
4) Tulangan sengkang Ø12 Kg 7.646,97 20.139,38 154.005.183,01 0,342 % 7.646,97 154.005.183,01 0,342 - - - 7.646,97 154.005.183,01 0,342 % 100,00
5) Beton f'c 25 MPa M3 86,38 1.917.323,54 165.618.407,02 0,368 % 86,38 165.618.407,02 0,368 - - - 86,38 165.618.407,02 0,368 % 100,00
b Balok B3 - 30 x 50 cm
1) Bekisting 2x Pakai M2 5,20 307.475,50 1.598.872,60 0,004 % 5,20 1.598.872,60 0,004 - - - 5,20 1.598.872,60 0,004 % 100,00
2) Tulangan utama D19 Kg 61,43 20.139,38 1.237.073,07 0,003 % 61,43 1.237.073,07 0,003 - - - 61,43 1.237.073,07 0,003 % 100,00
3) Tulangan badan D13 Kg 9,59 20.139,38 193.042,80 0,000 % 9,59 193.042,80 0,000 - - - 9,59 193.042,80 0,000 % 100,00
4) Tulangan sengkang Ø10 Kg 30,18 20.139,38 607.883,67 0,001 % 30,18 607.883,67 0,001 - - - 30,18 607.883,67 0,001 % 100,00
5) Beton f'c 25 MPa M3 0,60 1.917.323,54 1.150.394,12 0,003 % 0,60 1.150.394,12 0,003 - - - 0,60 1.150.394,12 0,003 % 100,00
c Balok B4 - 25 x 50 cm
1) Bekisting 2x Pakai M2 283,13 307.475,50 87.054.000,94 0,194 % 283,13 87.054.000,94 0,194 - - - 283,13 87.054.000,94 0,194 % 100,00
2) Tulangan utama D16 Kg 3.288,74 20.139,38 66.233.097,89 0,147 % 3.288,74 66.233.097,89 0,147 - - - 3.288,74 66.233.097,89 0,147 % 100,00
3) Tulangan sengkang Ø10 Kg 1.663,79 20.139,38 33.507.600,91 0,075 % 1.663,79 33.507.600,91 0,075 - - - 1.663,79 33.507.600,91 0,075 % 100,00
4) Beton f'c 25 MPa M3 28,31 1.917.323,54 54.284.222,60 0,121 % 28,31 54.284.222,60 0,121 - - - 28,31 54.284.222,60 0,121 % 100,00
d Balok B5 - 25 x 50 cm
1) Bekisting 2x Pakai M2 8,88 307.475,50 2.728.845,06 0,006 % 8,88 2.728.845,06 0,006 - - - 8,88 2.728.845,06 0,006 % 100,00
2) Tulangan utama D16 Kg 109,53 20.139,38 2.205.942,31 0,005 % 109,53 2.205.942,31 0,005 - - - 109,53 2.205.942,31 0,005 % 100,00
3) Tulangan sengkang Ø10 Kg 69,39 20.139,38 1.397.536,48 0,003 % 69,39 1.397.536,48 0,003 - - - 69,39 1.397.536,48 0,003 % 100,00
4) Beton f'c 25 MPa M3 0,89 1.917.323,54 1.701.624,64 0,004 % 0,89 1.701.624,64 0,004 - - - 0,89 1.701.624,64 0,004 % 100,00
e Balok latei 1 - 12x12 cm
1) Bekisting 2x Pakai M2 31,67 307.475,50 9.737.503,10 0,022 % 31,67 9.737.503,10 0,022 - - - 31,67 9.737.503,10 0,022 % 100,00
2) Tulangan utama Ø10 Kg 227,78 20.139,38 4.587.361,36 0,010 % 227,78 4.587.361,36 0,010 - - - 227,78 4.587.361,36 0,010 % 100,00
3) Tulangan sengkang Ø6 Kg 52,20 20.139,38 1.051.281,18 0,002 % 52,20 1.051.281,18 0,002 - - - 52,20 1.051.281,18 0,002 % 100,00
4) Beton f'c 14,5 MPa M3 1,27 1.560.202,90 1.976.415,11 0,004 % 1,27 1.976.415,11 0,004 - - - 1,27 1.976.415,11 0,004 % 100,00
3 Pekerjaan Balok Lantai 2
a Balok B1 - 40 x 70 cm
1) Bekisting 2x Pakai m2 534,60 307.475,50 164.376.402,30 0,366 % 534,60 164.376.402,30 0,366 - - - 534,60 164.376.402,30 0,366 % 100,00
2) Tulangan utama D19 kg 10.261,91 20.139,38 206.668.520,12 0,460 % 10.261,91 206.668.520,12 0,460 - - - 10.261,91 206.668.520,12 0,460 % 100,00
3) Tulangan badan D19 kg 1.520,28 20.139,38 30.617.558,54 0,068 % 1.520,28 30.617.558,54 0,068 - - - 1.520,28 30.617.558,54 0,068 % 100,00
4) Tulangan sengkang Ø12 kg 7.512,49 20.139,38 151.296.882,46 0,336 % 7.512,49 151.296.882,46 0,336 - - - 7.512,49 151.296.882,46 0,336 % 100,00
5) Beton f'c 25 MPa m3 83,16 1.917.323,54 159.444.625,23 0,355 % 83,16 159.444.625,23 0,355 - - - 83,16 159.444.625,23 0,355 % 100,00
b Balok B3 - 30 x 50 cm
1) Bekisting 2x Pakai M2 5,20 307.475,50 1.598.872,60 0,004 % 5,20 1.598.872,60 0,004 - - - 5,20 1.598.872,60 0,004 % 100,00
2) Tulangan utama D19 M2 61,43 20.139,38 1.237.073,07 0,003 % 61,43 1.237.073,07 0,003 - - - 61,43 1.237.073,07 0,003 % 100,00
3) Tulangan badan D13 M2 19,17 20.139,38 386.085,59 0,001 % 19,17 386.085,59 0,001 - - - 19,17 386.085,59 0,001 % 100,00
4) Tulangan sengkang Ø10 Kg 30,53 20.139,38 614.836,59 0,001 % 30,53 614.836,59 0,001 - - - 30,53 614.836,59 0,001 % 100,00
5) Beton f'c 25 MPa M2 0,60 1.917.323,54 1.150.394,12 0,003 % 0,60 1.150.394,12 0,003 - - - 0,60 1.150.394,12 0,003 % 100,00
c Balok B4 - 25 x 50 cm
1) Bekisting 2x Pakai M2 279,38 307.475,50 85.900.967,81 0,191 % 279,38 85.900.967,81 0,191 - - - 279,38 85.900.967,81 0,191 % 100,00
2) Tulangan utama D16 M2 3.245,18 20.139,38 65.355.838,32 0,145 % 3.245,18 65.355.838,32 0,145 - - - 3.245,18 65.355.838,32 0,145 % 100,00
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
3) Tulangan sengkang Ø10 M2 1.641,48 20.139,38 33.058.392,75 0,074 % 1.641,48 33.058.392,75 0,074 - - - 1.641,48 33.058.392,75 0,074 % 100,00
4) Beton f'c 25 MPa M2 27,94 1.917.323,54 53.565.226,28 0,119 % 27,94 53.565.226,28 0,119 - - - 27,94 53.565.226,28 0,119 % 100,00
d Balok B5 - 25 x 50 cm
1) Bekisting 2x Pakai M3 8,88 307.475,50 2.728.845,06 0,006 % 8,88 2.728.845,06 0,006 - - - 8,88 2.728.845,06 0,006 % 100,00
2) Tulangan utama D16 Kg 109,53 20.139,38 2.205.942,31 0,005 % 109,53 2.205.942,31 0,005 - - - 109,53 2.205.942,31 0,005 % 100,00
3) Tulangan sengkang Ø10 M2 69,39 20.139,38 1.397.536,48 0,003 % 69,39 1.397.536,48 0,003 - - - 69,39 1.397.536,48 0,003 % 100,00
4) Beton f'c 25 MPa M 0,89 1.917.323,54 1.701.624,64 0,004 % 0,89 1.701.624,64 0,004 - - - 0,89 1.701.624,64 0,004 % 100,00
e Balok latei 1 - 12x12 cm
1) Bekisting 2x Pakai M 35,05 307.475,50 10.778.000,20 0,024 % 35,05 10.778.000,20 0,024 - - - 35,05 10.778.000,20 0,024 % 100,00
2) Tulangan utama Ø10 M3 252,12 20.139,38 5.077.542,06 0,011 % 252,12 5.077.542,06 0,011 - - - 252,12 5.077.542,06 0,011 % 100,00
3) Tulangan sengkang Ø6 Kg 57,70 20.139,38 1.162.130,55 0,003 % 57,70 1.162.130,55 0,003 - - - 57,70 1.162.130,55 0,003 % 100,00
4) Beton f'c 14,5 MPa Kg 1,40 1.560.202,90 2.187.604,17 0,005 % 1,40 2.187.604,17 0,005 - - - 1,40 2.187.604,17 0,005 % 100,00
4 Pekerjaan Balok Lantai 3
a Balok B1 - 40 x 70 cm
1) Bekisting 2x Pakai M3 534,60 307.475,50 164.376.402,30 0,366 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 Kg 10.261,91 20.139,38 206.668.520,12 0,460 % - - - - - - - - 0,000 % -
3) Tulangan badan D19 M2 1.520,28 20.139,38 30.617.558,54 0,068 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø12 M3 7.361,79 20.139,38 148.261.755,04 0,330 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa Kg 83,16 1.917.323,54 159.444.625,23 0,355 % - - - - - - - - 0,000 % -
b Balok B3 - 30 x 50 cm
1) Bekisting 2x Pakai m2 5,20 307.475,50 1.598.872,60 0,004 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 kg 61,43 20.139,38 1.237.073,07 0,003 % - - - - - - - - 0,000 % -
3) Tulangan badan D13 kg 9,59 20.139,38 193.042,80 0,000 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø10 kg 30,18 20.139,38 607.883,67 0,001 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa m3 0,60 1.917.323,54 1.150.394,12 0,003 % - - - - - - - - 0,000 % -
c Balok B4 - 25 x 50 cm
1) Bekisting 2x Pakai m2 279,38 307.475,50 85.900.967,81 0,191 % - - - - - - - - 0,000 % -
2) Tulangan utama D16 kg 3.245,18 20.139,38 65.355.838,32 0,145 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø10 kg 1.641,48 20.139,38 33.058.392,75 0,074 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 27,94 1.917.323,54 53.565.226,28 0,119 % - - - - - - - - 0,000 % -
d Balok B5 - 25 x 50 cm
1) Bekisting 2x Pakai m2 8,88 307.475,50 2.728.845,06 0,006 % - - - - - - - - 0,000 % -
2) Tulangan utama D16 kg 109,53 20.139,38 2.205.942,31 0,005 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø10 kg 69,39 20.139,38 1.397.536,48 0,003 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 0,89 1.917.323,54 1.701.624,64 0,004 % - - - - - - - - 0,000 % -
e Balok latei 1 - 12x12 cm
1) Bekisting 2x Pakai m2 35,05 307.475,50 10.778.000,20 0,024 % - - - - - - - - 0,000 % -
2) Tulangan utama Ø10 kg 252,12 20.139,38 5.077.542,06 0,011 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø6 kg 57,70 20.139,38 1.162.130,55 0,003 % - - - - - - - - 0,000 % -
4) Beton f'c 14,5 MPa m3 1,40 1.560.202,90 2.187.604,17 0,005 % - - - - - - - - 0,000 % -
5 Pekerjaan Balok Lantai 4
a Balok B1 - 40 x 70 cm
1) Bekisting 2x Pakai m2 534,60 307.475,50 164.376.402,30 0,366 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 kg 10.261,91 20.139,38 206.668.520,12 0,460 % - - - - - - - - 0,000 % -
3) Tulangan badan D19 kg 1.520,28 20.139,38 30.617.558,54 0,068 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø12 kg 7.361,79 20.139,38 148.261.755,04 0,330 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa m3 83,16 1.917.323,54 159.444.625,23 0,355 % - - - - - - - - 0,000 % -
b Balok B3 - 30 x 50 cm
1) Bekisting 2x Pakai m2 5,20 307.475,50 1.598.872,60 0,004 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 kg 61,43 20.139,38 1.237.073,07 0,003 % - - - - - - - - 0,000 % -
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
3) Tulangan badan D13 kg 9,59 20.139,38 193.042,80 0,000 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø10 kg 30,18 20.139,38 607.883,67 0,001 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa m3 0,60 1.917.323,54 1.150.394,12 0,003 % - - - - - - - - 0,000 % -
c Balok B4 - 25 x 50 cm
1) Bekisting 2x Pakai m2 279,38 307.475,50 85.900.967,81 0,191 % - - - - - - - - 0,000 % -
2) Tulangan utama D16 kg 3.245,18 20.139,38 65.355.838,32 0,145 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø10 kg 1.641,48 20.139,38 33.058.392,75 0,074 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 27,94 1.917.323,54 53.565.226,28 0,119 % - - - - - - - - 0,000 % -
d Balok B5 - 25 x 50 cm
1) Bekisting 2x Pakai m2 8,88 307.475,50 2.728.845,06 0,006 % - - - - - - - - 0,000 % -
2) Tulangan utama D16 kg 109,53 20.139,38 2.205.942,31 0,005 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø10 kg 69,39 20.139,38 1.397.536,48 0,003 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 0,89 1.917.323,54 1.701.624,64 0,004 % - - - - - - - - 0,000 % -
e Balok latei 1 - 12x12 cm
1) Bekisting 2x Pakai m2 35,05 307.475,50 10.778.000,20 0,024 % - - - - - - - - 0,000 % -
2) Tulangan utama Ø10 kg 252,12 20.139,38 5.077.542,06 0,011 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø6 kg 57,70 20.139,38 1.162.130,55 0,003 % - - - - - - - - 0,000 % -
4) Beton f'c 14,5 MPa m3 1,40 1.560.202,90 2.187.604,17 0,005 % - - - - - - - - 0,000 % -
6 Pekerjaan Balok Lantai Top Floor
a Balok B2 - 40 x 70 cm
1) Bekisting 2x Pakai m2 475,20 307.475,50 146.112.357,60 0,325 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 kg 6.841,28 20.139,38 137.779.013,41 0,306 % - - - - - - - - 0,000 % -
3) Tulangan badan D13 kg 711,71 20.139,38 14.333.427,68 0,032 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø12 kg 4.766,49 20.139,38 95.994.128,96 0,213 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa m3 71,28 1.917.323,54 136.666.821,63 0,304 % - - - - - - - - 0,000 % -
b Balok B3 - 30 x 50 cm
1) Bekisting 2x Pakai m2 5,20 307.475,50 1.598.872,60 0,004 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 kg 61,43 20.139,38 1.237.073,07 0,003 % - - - - - - - - 0,000 % -
3) Tulangan badan D13 kg 9,59 20.139,38 193.042,80 0,000 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø10 kg 30,18 20.139,38 607.883,67 0,001 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa m3 0,60 1.917.323,54 1.150.394,12 0,003 % - - - - - - - - 0,000 % -
c Balok B6 - 25 x 40 cm
1) Bekisting 2x Pakai m2 248,64 307.475,50 76.450.708,32 0,170 % - - - - - - - - 0,000 % -
2) Tulangan utama D16 kg 2.578,72 20.139,38 51.933.766,82 0,115 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø10 kg 1.595,38 20.139,38 32.129.929,91 0,071 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 23,68 1.917.323,54 45.402.221,33 0,101 % - - - - - - - - 0,000 % -
d Balok latei 1 - 12x12 cm
1) Bekisting 2x Pakai m2 2,61 307.475,50 802.511,06 0,002 % - - - - - - - - 0,000 % -
2) Tulangan utama Ø10 kg 18,77 20.139,38 378.064,91 0,001 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø6 kg 4,44 20.139,38 89.394,66 0,000 % - - - - - - - - 0,000 % -
4) Beton f'c 14,5 MPa m3 0,10 1.560.202,90 162.885,18 0,000 % - - - - - - - - 0,000 % -
e Ringbalk 15x20 cm
1) Bekisting 2x Pakai m2 21,95 307.475,50 6.747.549,85 0,015 % - - - - - - - - 0,000 % -
2) Tulangan utama Ø12 kg 495,88 20.139,38 9.986.720,61 0,022 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø8 kg 203,21 20.139,38 4.092.606,62 0,009 % - - - - - - - - 0,000 % -
4) Beton f'c 14,5 MPa m3 3,99 1.560.202,90 6.224.928,74 0,014 % - - - - - - - - 0,000 % -
7 Pekerjaan Balok Lantai Roof Top
a Balok B3 - 30 x 50 cm
1) Bekisting 2x Pakai m2 185,71 307.475,50 57.099.737,73 0,127 % - - - - - - - - 0,000 % -
2) Tulangan utama D19 kg 2.193,66 20.139,38 44.178.972,09 0,098 % - - - - - - - - 0,000 % -
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
3) Tulangan badan D13 kg 342,32 20.139,38 6.894.040,89 0,015 % - - - - - - - - 0,000 % -
4) Tulangan sengkang Ø10 kg 1.058,21 20.139,38 21.311.686,41 0,047 % - - - - - - - - 0,000 % -
5) Beton f'c 25 MPa m3 21,43 1.917.323,54 41.083.450,06 0,091 % - - - - - - - - 0,000 % -
b Balok B6 - 25 x 40 cm
1) Bekisting 2x Pakai m2 248,64 307.475,50 76.450.708,32 0,170 % - - - - - - - - 0,000 % -
2) Tulangan utama D16 kg 2.578,72 20.139,38 51.933.766,82 0,115 % - - - - - - - - 0,000 % -
3) Tulangan sengkang Ø10 kg 1.595,38 20.139,38 32.129.929,91 0,071 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 23,68 1.917.323,54 45.402.221,33 0,101 % - - - - - - - - 0,000 % -
E PEKERJAAN PLAT LANTAI 4.601.341.523,97
1 Pekerjaan Pelat Lantai Basement
a Plat beton tebal 15 cm (Elevasi + 0.00)
1) Urugan pasir bawah lantai, 5 cm m3 34,12 422.912,50 14.428.822,95 0,032 % 34,12 14.428.822,95 0,032 - - - 34,12 14.428.822,95 0,032 % 100,00
2) Lantai kerja 5 cm m3 34,12 1.395.713,93 47.618.618,89 0,106 % 34,12 47.618.618,89 0,106 - - - 34,12 47.618.618,89 0,106 % 100,00
3) Besi Tulangan Ø10 kg 13.516,61 20.139,38 272.216.044,79 0,605 % 13.516,61 272.216.044,79 0,605 - - - 13.516,61 272.216.044,79 0,605 % 100,00
4) Beton f'c 25 MPa m3 102,35 1.917.323,54 196.244.295,18 0,436 % 102,35 196.244.295,18 0,436 - - - 102,35 196.244.295,18 0,436 % 100,00
5) Screeding penebalan lantai 5 cm m2 755,25 212.162,50 160.235.728,13 0,356 % - - - - - - - - 0,000 % -
b Pelat lantai ramp masuk
1) Urugan pasir bawah lantai, 5 cm m3 5,18 422.912,50 2.189.629,47 0,005 % - - - - - - - - 0,000 % -
2) Lantai kerja 10 cm, lean concrete m3 10,36 1.395.713,93 14.452.617,73 0,032 % - - - - - - - - 0,000 % -
3) Bekisting 2x Pakai m2 9,50 361.669,25 3.435.857,88 0,008 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 15,53 1.917.323,54 29.780.827,82 0,066 % - - - - - - - - 0,000 % -
c Pelat lantai ramp keluar
1) Urugan pasir bawah lantai, 5 cm m3 4,17 422.912,50 1.761.869,51 0,004 % - - - - - - - - 0,000 % -
2) Lantai kerja 10 cm, lean concrete m3 8,33 1.395.713,93 11.629.194,32 0,026 % - - - - - - - - 0,000 % -
3) Bekisting 2x Pakai m2 8,33 361.669,25 3.013.455,62 0,007 % - - - - - - - - 0,000 % -
4) Beton f'c 25 MPa m3 12,50 1.917.323,54 23.962.927,69 0,053 % - - - - - - - - 0,000 % -
2 Pekerjaan Pelat Lantai I
a Plat beton tebal 12.5 cm
1) Bekisting 2x Pakai m2 644,32 361.669,25 233.031.816,17 0,518 % 644,32 233.031.816,17 0,518 - - - 644,32 233.031.816,17 0,518 % 100,00
2) Besi Tulangan Ø10 kg 14.345,77 20.139,38 288.914.755,79 0,643 % 14.345,77 288.914.755,79 0,643 - - - 14.345,77 288.914.755,79 0,643 % 100,00
3) Beton f'c 25 MPa m3 80,54 1.917.323,54 154.421.956,56 0,343 % 80,54 154.421.956,56 0,343 - - - 80,54 154.421.956,56 0,343 % 100,00
b Pelat beton pantry & wastafel 8 cm
1) Bekisting 2x Pakai m2 3,96 361.669,25 1.431.486,89 0,003 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 49,56 20.139,38 998.054,11 0,002 % - - - - - - - - 0,000 % -
3) Beton f'c 14,5 MPa m3 0,28 1.560.202,90 430.616,00 0,001 % - - - - - - - - 0,000 % -
c Rabat beton f'c 14,5 MPa entrance m3 0,41 1.560.202,90 643.583,70 0,001 % - - - - - - - - 0,000 % -
3 Pekerjaan Pelat Lantai 2
a Plat beton tebal 12.5 cm
1) Bekisting 2x Pakai m2 633,28 361.669,25 229.038.987,65 0,509 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 14.048,72 20.139,38 282.932.383,35 0,629 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 79,16 1.917.323,54 151.776.050,08 0,338 % - - - - - - - - 0,000 % -
b Pelat beton pantry & wastafel 8 cm
1) Bekisting 2x Pakai m2 3,96 361.669,25 1.431.486,89 0,003 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 49,56 20.139,38 998.054,11 0,002 % - - - - - - - - 0,000 % -
3) Beton f'c 14,5 MPa m3 0,28 1.560.202,90 430.616,00 0,001 % - - - - - - - - 0,000 % -
4 Pekerjaan Pelat Lantai 3
a Plat beton tebal 12.5 cm
1) Bekisting 2x Pakai m2 633,28 361.669,25 229.038.987,65 0,509 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 14.048,72 20.139,38 282.932.383,35 0,629 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 79,16 1.917.323,54 151.776.050,08 0,338 % - - - - - - - - 0,000 % -
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
b Pelat beton pantry & wastafel 8 cm
1) Bekisting 2x Pakai m2 3,96 361.669,25 1.431.486,89 0,003 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 49,56 20.139,38 998.054,11 0,002 % - - - - - - - - 0,000 % -
3) Beton f'c 14,5 MPa m3 0,28 1.560.202,90 430.616,00 0,001 % - - - - - - - - 0,000 % -
5 Pekerjaan Pelat Lantai 4
a Plat beton tebal 12.5 cm
1) Bekisting 2x Pakai m2 633,28 361.669,25 229.038.987,65 0,509 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 14.048,72 20.139,38 282.932.383,35 0,629 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 79,16 1.917.323,54 151.776.050,08 0,338 % - - - - - - - - 0,000 % -
b Pelat beton pantry & wastafel 8 cm
1) Bekisting 2x Pakai m2 3,96 361.669,25 1.431.486,89 0,003 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 14.048,72 20.139,38 282.932.383,35 0,629 % - - - - - - - - 0,000 % -
3) Beton f'c 14,5 MPa m3 79,16 1.560.202,90 123.506.246,70 0,275 % - - - - - - - - 0,000 % -
6 Pekerjaan Pelat Lantai Top Floor
a Plat beton tebal 12.5 cm
Bekisting 2x Pakai m2 683,49 361.669,25 247.198.762,36 0,550 % - - - - - - - - 0,000 % -
Besi Tulangan Ø10 kg 15.070,99 20.139,38 303.520.316,95 0,675 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 85,44 1.917.323,54 163.809.891,59 0,364 % - - - - - - - - 0,000 % -
7 Pekerjaan Pelat Lantai Roof top
a Plat beton tebal 12.5 cm
1) Bekisting 2x Pakai m2 22,54 361.669,25 8.152.024,90 0,018 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 kg 376,56 20.139,38 7.583.615,76 0,017 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 2,82 1.917.323,54 5.402.059,06 0,012 % - - - - - - - - 0,000 % -
F PEKERJAAN STUKTUR LIFT 45.181.312,23
1 Pekerjaan Pit Lift
a Bekisting m2 22,29 189.911,00 4.233.590,97 0,009 % 22,29 4.233.590,97 0,009 - - - 22,29 4.233.590,97 0,009 % 100,00
b Besi Tulangan D16 kg 367,82 20.139,38 7.407.757,84 0,016 % 367,82 7.407.757,84 0,016 - - - 367,82 7.407.757,84 0,016 % 100,00
c Besi Tulangan D13 kg 761,74 20.139,38 15.341.027,15 0,034 % 761,74 15.341.027,15 0,034 - - - 761,74 15.341.027,15 0,034 % 100,00
d Beton f'c 25 MPa m3 2,79 1.917.323,54 5.342.741,86 0,012 % 2,79 5.342.741,86 0,012 - - - 2,79 5.342.741,86 0,012 % 100,00
2 Pekerjaan balok latai BL2-15x20 cm
a Bekisting m2 12,17 307.475,50 3.741.592,49 0,008 % 9,13 2.806.194,37 0,006 3,04 935.398,12 0,002 12,17 3.741.592,49 0,008 % 100,00
b Besi Tulangan Ø12 kg 82,50 20.139,38 1.661.399,71 0,004 % 61,87 1.246.049,79 0,003 20,62 415.349,93 0,001 82,50 1.661.399,71 0,004 % 100,00
c Besi Tulangan Ø8 kg 73,58 20.139,38 1.481.805,85 0,003 % 55,18 1.111.354,39 0,002 18,39 370.451,46 0,001 73,58 1.481.805,85 0,003 % 100,00
d Beton f'c 25 MPa m3 0,66 1.917.323,54 1.272.623,50 0,003 % 0,17 318.155,87 0,001 0,50 954.467,62 0,002 0,66 1.272.623,50 0,003 % 100,00
3 Pekerjaan balok B8 - 25x40 cm
a Bekisting 2x Pakai m2 4,94 307.475,50 1.517.391,59 0,003 % - - - - - - - - 0,000 % -
b Tulangan utama D16 kg 68,24 20.139,38 1.374.373,33 0,003 % - - - - - - - - 0,000 % -
c Tulangan sengkang Ø10 kg 44,98 20.139,38 905.865,87 0,002 % - - - - - - - - 0,000 % -
d Beton f'c 25 MPa m3 0,47 1.917.323,54 901.142,06 0,002 % - - - - - - - - 0,000 % -
G PEKERJAAN TANGGA 421.218.645,89
1 Pekerjaan tangga lantai basement
a Pekerjaan Tangga Utama
1) Pelat tangga & bordes
Bekisting 2x Pakai m2 49,50 361.669,25 17.902.627,88 0,040 % - - - - - - - - 0,000 % -
Besi Tulangan Ø10 kg 894,62 20.139,38 18.016.996,63 0,040 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 7,08 1.917.323,54 13.574.650,63 0,030 % - - - - - - - - 0,000 % -
2) Balok B7 35x50 cm
Bekisting 2x Pakai m2 8,10 307.475,50 2.490.551,55 0,006 % - - - - - - - - 0,000 % -
Besi Tulangan D19 kg 153,56 20.139,38 3.092.682,68 0,007 % - - - - - - - - 0,000 % -
Besi Tulangan D13 kg 14,38 20.139,38 289.564,20 0,001 % - - - - - - - - 0,000 % -
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
Besi Tulangan Ø12 kg 75,55 20.139,38 1.521.497,07 0,003 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 1,05 1.917.323,54 2.013.189,71 0,004 % - - - - - - - - 0,000 % -
c Pekerjaan Tangga Service
Pelat tangga & bordes
1) Bekisting 2x Pakai m3 23,16 361.669,25 8.376.259,83 0,019 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 m3 749,82 20.139,38 15.100.843,57 0,034 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 2,93 1.917.323,54 5.625.427,25 0,013 % - - - - - - - - 0,000 % -
2 Pekerjaan tangga lantai 1
a Pekerjaan Tangga Utama
1) Pelat tangga & bordes
Bekisting 2x Pakai m2 49,50 361.669,25 17.902.627,88 0,040 % - - - - - - - - 0,000 % -
Besi Tulangan Ø10 kg 894,62 20.139,38 18.016.996,63 0,040 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 7,08 1.917.323,54 13.574.650,63 0,030 % - - - - - - - - 0,000 % -
2) Balok B7 35x50 cm
Bekisting 2x Pakai m2 8,10 307.475,50 2.490.551,55 0,006 % - - - - - - - - 0,000 % -
Besi Tulangan D19 kg 153,56 20.139,38 3.092.682,68 0,007 % - - - - - - - - 0,000 % -
Besi Tulangan D13 kg 14,38 20.139,38 289.564,20 0,001 % - - - - - - - - 0,000 % -
Besi Tulangan Ø12 kg 75,55 20.139,38 1.521.497,07 0,003 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 1,05 1.917.323,54 2.013.189,71 0,004 % - - - - - - - - 0,000 % -
b Pekerjaan Tangga Service
Pelat tangga & bordes
Bekisting 2x Pakai m3 23,16 361.669,25 8.376.259,83 0,019 % - - - - - - - - 0,000 % -
Besi Tulangan Ø10 m3 749,82 20.139,38 15.100.843,57 0,034 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 2,93 1.917.323,54 5.625.427,25 0,013 % - - - - - - - - 0,000 % -
3 Pekerjaan tangga lantai 2
a Pekerjaan Tangga Utama
Pelat tangga & bordes
Bekisting 2x Pakai m2 49,50 361.669,25 17.902.627,88 0,040 % - - - - - - - - 0,000 % -
Besi Tulangan Ø10 kg 894,62 20.139,38 18.016.996,63 0,040 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 7,08 1.917.323,54 13.574.650,63 0,030 % - - - - - - - - 0,000 % -
b Balok B7 35x50 cm
Bekisting 2x Pakai m2 8,10 307.475,50 2.490.551,55 0,006 % - - - - - - - - 0,000 % -
Besi Tulangan D19 kg 153,56 20.139,38 3.092.682,68 0,007 % - - - - - - - - 0,000 % -
Besi Tulangan D13 kg 14,38 20.139,38 289.564,20 0,001 % - - - - - - - - 0,000 % -
Besi Tulangan Ø12 kg 75,55 20.139,38 1.521.497,07 0,003 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 1,05 1.917.323,54 2.013.189,71 0,004 % - - - - - - - - 0,000 % -
c Pekerjaan Tangga Service
Pelat tangga & bordes
Bekisting 2x Pakai m3 23,16 361.669,25 8.376.259,83 0,019 % - - - - - - - - 0,000 % -
Besi Tulangan Ø10 m3 749,82 20.139,38 15.100.843,57 0,034 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 2,93 1.917.323,54 5.625.427,25 0,013 % - - - - - - - - 0,000 % -
4 Pekerjaan tangga lantai 3
a Pekerjaan Tangga Utama
1) Pelat tangga & bordes
Bekisting 2x Pakai m2 49,50 361.669,25 17.902.627,88 0,040 % - - - - - - - - 0,000 % -
Besi Tulangan Ø10 kg 894,62 20.139,38 18.016.996,63 0,040 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 7,08 1.917.323,54 13.574.650,63 0,030 % - - - - - - - - 0,000 % -
2) Balok B7 35x50 cm
Bekisting 2x Pakai m2 8,10 307.475,50 2.490.551,55 0,006 % - - - - - - - - 0,000 % -
Besi Tulangan D19 kg 153,56 20.139,38 3.092.682,68 0,007 % - - - - - - - - 0,000 % -
SESUAI KONTRAK PRESENTASE KEMAJUAN PEKERJAAN BOBOT
No.
HARGA MINGGU LALU MINGGU INI S/D MINGGU INI REALISASI
Mata URAIAN PEKERJAAN JUMLAH HARGA BBT
SAT. VOL. SATUAN THD SLH
Pemb. (Rp) (%) BOBOT BOBOT BOBOT
(Rp) VOL. JML HARGA VOL. JML HARGA VOL. JML HARGA PEK. (%)
(%) (%) (%)
Besi Tulangan D13 kg 14,38 20.139,38 289.564,20 0,001 % - - - - - - - - 0,000 % -
Besi Tulangan Ø12 kg 75,55 20.139,38 1.521.497,07 0,003 % - - - - - - - - 0,000 % -
Beton f'c 25 MPa m3 1,05 1.917.323,54 2.013.189,71 0,004 % - - - - - - - - 0,000 % -
b Pekerjaan Tangga Service
Pelat tangga & bordes
1) Bekisting 2x Pakai m3 23,16 361.669,25 8.376.259,83 0,019 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 m3 749,82 20.139,38 15.100.843,57 0,034 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 2,93 1.917.323,54 5.625.427,25 0,013 % - - - - - - - - 0,000 % -
5 Pekerjaan tangga lantai 4
a Pekerjaan Tangga Service
0 Pelat tangga & bordes
1) Bekisting 2x Pakai m3 22,66 361.669,25 8.195.425,21 0,018 % - - - - - - - - 0,000 % -
2) Besi Tulangan Ø10 m3 749,82 20.139,38 15.100.843,57 0,034 % - - - - - - - - 0,000 % -
3) Beton f'c 25 MPa m3 23,16 1.917.323,54 44.405.213,09 0,099 % - - - - - - - - 0,000 % -
6 Pekerjaan tangga lantai top floor
a Tangga man hole, besi hollow 40x40x2 mm, fin cat unit 1,00 1.500.000,00 1.500.000,00 0,003 % - - - - - - - - 0,000 % -
III PEKERJAAN ARSITEKTUR 17.084.020.563,24 37,993 %

IV PEKERJAAN MEP 11.208.360.858,47 24,926 %

V PEKERJAAN INTERIOR 421.442.947,38 0,937 %

JUMLAH 44.966.311.267,29 100,00 7.680.242.091,24 14,93 49.767.217,14 0,11 7.730.009.308,38 15,04


PPN 11% 4.946.294.239,40 Bobot Pekerjaan Minggu Lalu 14,93 % 850.301.023,92
JUMLAH TOTAL 49.912.605.506,70 Bobot Pekerjaan Minggu Ini 0,11 % 8.580.310.332,30
PEMBULATAN 49.912.605.000,00 Total Bobot Pekerjaan Sampai Minggu Ini 15,04 % 9.430.611.356,22
DISETUJUI OLEH : DIPERIKSA OLEH : DIBUAT OLEH :
TIM TEKNIS KONSULTAN PENGAWASAN KONTRAKTOR PELAKSANA
SATKER UNIVERSITAS KHAIRUN TERNATE PT. ARCI PRATAMA KONS. KSO. PT. BARUGA BULAENG INDOTAMA PT. HAKA Utama

Ir. IMRAN, ST.,M.Eng HERY PURNOMO, ST.,M.Ars SUDIRMAN Hi. UMAR, ST.,MT Ir. SURIYADDIN USMAN, ST.IPM ABDUL KAHAR, ST
Ketua TIM Teknis Anggota TIM Teknis Anggota TIM Teknis Struktur Enginering Project Manager