PEMERINTAH KABUPATEN KAMPAR

DINAS PENDIDIKAN KEPEMUDAAN DAN OLAHRAGA


KABUPATEN KAMPAR
JALAN MAYJEN D.I. PANJAITAN NO.16 TELP. (0762) 20872
BANGKINANG KOTA

AS BUILT DRAWING

MINGGU KE - 17
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH

PEKERJAAN : REHAB UPT SDN 008 RUMBIO KEC. KAMPAR

LOKASI : UPT SDN 008 RUMBIO KEC. KAMPAR

NO. KONTRAK : 010/DIKPORA/SPK.REHAB-SD/APBD.2023

TANGGAL : 18 Juli 2023

Kontraktor Pelaksana

CV. FITRAH ABDI LESTARI


APBD TAHUN ANGGARAN 2023
PEMERINTAH KABUPATEN KAMPAR
DINAS PENDIDIKAN KEPEMUDAAN DAN OLAHRAGA
JALAN MAYJEN D.I. PANJAITAN NO.16 TELP. (0762) 20872

BACK UP DATA
HARIAN, MINGGUAN DAN BULANAN

KEGIATAN :
PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

SUB KEGIATAN :

PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH

PEKERJAAN :

PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

NO. KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022

TANGGAL 11 Juli 2022

LOKASI :
KECAMATAN TAMBANG

APBD TAHUN ANGGARAN 2022

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI


LAPORAN KEMAJUAN FISIK
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR BULAN KE : II (Dua)
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG TANGGAL : 28 Juli s/d 26 September 2020
LOKASI : KECAMATAN TAMBANG KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
T.A : 2022 KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

REALISASI
JUMLAH HARGA
HARGA SATUAN #REF! #REF! #REF!
NO URAIAN PEKERJAAN SAT VOLUME (Rp) BOBOT (%)
(Rp)
BOBOT BOBOT BOBOT
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
(%)/ITEM (%)/ITEM (%)/ITEM
### ###
0 0 0 0.00 0.00 0.00 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 0 0.00 0.00 0.00 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 Ls 1.00 150,000.00 150,000.00 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH I 150,000.00 Err:509 #REF! #REF! #REF!
- 0
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH I Err:509 Err:509 #REF! #REF! #REF!
0 0
0 0
0 0 M3 1.50 86,625.00 129,937.50 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 M3 0.30 230,010.00 69,003.00 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 M3 0.15 1,000,467.29 150,070.09 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0
0 0 M2 6.72 73,188.72 491,828.20 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 M3 0.45 63,250.00 28,462.50 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0 Btg 50.00 22,000.00 1,100,000.00 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
0 0
### Err:509 ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### Err:509 ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### Err:509 ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
REALISASI
JUMLAH HARGA
HARGA SATUAN #REF! #REF! #REF!
NO URAIAN PEKERJAAN SAT VOLUME (Rp) BOBOT (%)
(Rp)
BOBOT BOBOT BOBOT
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
(%)/ITEM (%)/ITEM (%)/ITEM
### ###
### Err:509 ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### Err:509 ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### Err:509 ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH I Err:509 Err:509 #REF! #REF! #REF!
### ###
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH I Err:509 Err:509 #REF! #REF! #REF!
### ###
### ### ### Err:509 Err:509 Err:509 Err:509 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
JUMLAH I Err:509 Err:509 #REF! #REF! #REF!
JUMLAH Err:509 Err:509 #REF! #REF! #REF!
PPN 10% Err:509 RENCANA SAMPAI BULAN INI #REF!
TOTAL BIAYA Err:509 REALISASI SAMPAI BULAN INI #REF!
DIBULATKAN Err:509 DEVIASI PEKERJAAN #REF!

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


#REF! Konsultan Pengawas Kontraktor Pelaksana
#REF! PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

#REF! ISYKARIMAN #REF!


#REF! Direktur #REF!
PEMERINTAH KABUPATEN KAMPAR
DINAS PENDIDIKAN KEPEMUDAAN DAN OLAHRAGA
JALAN MAYJEN D.I. PANJAITAN NO.16 TELP. (0762) 20872

LAPORAN PROGRES MINGGUAN


MINGGU KE - 6
PERIODE : 15 Agustus s/d 19 Agustus 2023

KEGIATAN :
PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

SUB KEGIATAN :

PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH

PEKERJAAN :

PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

NO. KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022

TANGGAL 11 Juli 2022

LOKASI :
KECAMATAN TAMBANG

APBD TAHUN ANGGARAN 2022

KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA

PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI


LAPORAN BULANAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR BULAN KE : I (Satu)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 11 Juli s/d 07 Agustus
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Bulan Lalu Bulan Ini S/D Bulan Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 - - - 1.00 100.00 0.47 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 - - - 1.00 100.00 0.79 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 - - - 1.00 100.00 1.11 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 - - - 1.00 100.00 1.52 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 - - - 1.50 100.00 0.41 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 - - - 0.30 100.00 0.22 0.30 100.00 0.22

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 - - - 0.15 100.00 0.48 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 - - - 3.36 100.00 2.82 3.36 100.00 2.82

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 - - - 6.72 100.00 1.56 6.72 100.00 1.56

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 - - - 0.45 100.00 0.09 0.45 100.00 0.09

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 - - - 50.00 100.00 3.48 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 - - - 67.50 100.00 4.93 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 - - - 6.00 100.00 1.90 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 - - - 0.45 100.00 1.62 0.45 100.00 1.62

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 - - - 100.80 100.00 7.37 100.80 100.00 7.37
Realisasi
S/D Bulan Lalu Bulan Ini S/D Bulan Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 - - - 8.96 100.00 3.00 8.96 100.00 3.00

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 - - - 0.67 100.00 2.42 0.67 100.00 2.42

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 - - - 141.75 100.00 10.36 141.75 100.00 10.36

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 - - - 10.50 100.00 5.75 10.50 100.00 5.75

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 - - - 0.95 100.00 3.42 0.95 100.00 3.42

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 - - - 31.08 100.00 12.66 31.08 100.00 12.66

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 - - - 18.00 100.00 8.25 18.00 100.00 8.25

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 - - - 31.08 50.00 7.20 31.08 50.00 7.20

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 - - - - - - - - -

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 - - - 1.00 100.00 1.74 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 - - - - - - - - -

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 - - - - - - - - -

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 - - - - - - - - -

JUMLAH 31,585,975.67 100.00 - 83.58 83.58

PPN 11% 3,474,457.32 RENCANA SAMPAI BULAN INI 26.54

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI BULAN INI 83.58

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 57.04

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Bulan Lalu Bulan Ini S/D Bulan Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN KEMAJUAN BOBOT PEKERJAAN 100%

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR BULAN KE : II (Dua)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 12 Agustus 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Bulan Lalu Bulan Ini S/D Bulan Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 1.00 100.00 0.47 - - - 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 1.00 100.00 0.79 - - - 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 1.00 100.00 1.11 - - - 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 1.00 100.00 1.52 - - - 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 1.50 100.00 0.41 - - - 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 0.30 100.00 0.22 - - - 0.30 100.00 0.22

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 0.15 100.00 0.48 - - - 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 3.36 100.00 2.82 - - - 3.36 100.00 2.82

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 6.72 100.00 1.56 - - - 6.72 100.00 1.56

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 0.45 100.00 0.09 - - - 0.45 100.00 0.09

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 50.00 100.00 3.48 - - - 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 67.50 100.00 4.93 - - - 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 6.00 100.00 1.90 - - - 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 0.45 100.00 1.62 - - - 0.45 100.00 1.62

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 100.80 100.00 7.37 - - - 100.80 100.00 7.37
Realisasi
S/D Bulan Lalu Bulan Ini S/D Bulan Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 8.96 100.00 3.00 - - - 8.96 100.00 3.00

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 0.67 100.00 2.42 - - - 0.67 100.00 2.42

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 141.75 100.00 10.36 - - - 141.75 100.00 10.36

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 10.50 100.00 5.75 - - - 10.50 100.00 5.75

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 0.95 100.00 3.42 - - - 0.95 100.00 3.42

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 31.08 100.00 12.66 - - - 31.08 100.00 12.66

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 18.00 100.00 8.25 - - - 18.00 100.00 8.25

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 31.08 50.00 7.20 31.08 50.00 7.20 62.16 100.00 14.40

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 - - - 23.52 100.00 3.31 23.52 100.00 3.31

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 1.00 100.00 1.74 - - - 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG 0 0.00 -

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 - - - 8.40 100.00 0.65 8.40 100.00 0.65

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 - - - 62.16 100.00 4.78 62.16 100.00 4.78

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 - - - 1.00 100.00 0.47 1.00 100.00 0.47

JUMLAH 31,585,975.67 100.00 83.58 16.42 100.00

PPN 11% 3,474,457.32 RENCANA SAMPAI BULAN INI 46.93

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI BULAN INI 100.00

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 53.07

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Bulan Lalu Bulan Ini S/D Bulan Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : I (Satu)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 11 Juli s/d 17 Juli 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 - - 1.00 100.00 0.47 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 - - 1.00 100.00 0.79 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 - - 1.00 100.00 1.11 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 - - 1.00 100.00 1.52 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 - - 1.50 100.00 0.41 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 - - 0.30 100.00 0.22 0.30 100.00 0.22

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 - - 0.15 100.00 0.48 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 - - - - - - -

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 - - - - - - -

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 - - - - - - -

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 - - 50.00 100.00 3.48 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 - - 67.50 100.00 4.93 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 - - 6.00 100.00 1.90 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 - - 0.45 100.00 1.62 0.45 100.00 1.62

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 - - - - - - -


Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 - - - - - - -

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 - - - - - - -

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 - - - - - - -

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 - - - - - - -

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 - - - - - - -

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 - - - - - - -

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 - - - - - - -

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 - - - - - - -

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 - - - - - - -

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 - - 1.00 100.00 1.74 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG 0 0.00 -

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 - - - - - - -

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 - - - - - - -

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 - - - - - - -

JUMLAH 31,585,975.67 100.00 - 18.68 18.68

PPN 11% 3,474,457.32 RENCANA SAMPAI MINGGU INI 8.42

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI MINGGU INI 18.68

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 10.26

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19670817 199103 1 010 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : II (Dua)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 18 Juli s/d 24 Juli 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 1.00 100.00 0.47 - - 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 1.00 100.00 0.79 - - 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 1.00 100.00 1.11 - - 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 1.00 100.00 1.52 - - 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 1.50 100.00 0.41 - - 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 0.30 100.00 0.22 - - 0.30 100.00 0.22

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 0.15 100.00 0.48 - - 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 - - - 3.36 100.00 2.82 3.36 100.00 2.82

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 - - - 6.72 100.00 1.56 6.72 100.00 1.56

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 - - - 0.45 100.00 0.09 0.45 100.00 0.09

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 50.00 100.00 3.48 - - 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 67.50 100.00 4.93 - - 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 6.00 100.00 1.90 - - 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 0.45 100.00 1.62 - - 0.45 100.00 1.62

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 - - - 100.80 100.00 7.37 100.80 100.00 7.37
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 - - - 8.96 100.00 3.00 8.96 100.00 3.00

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 - - - 0.67 100.00 2.42 0.67 100.00 2.42

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 - - - - - - - -

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 - - - - - - - -

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 - - - - - - - -

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 - - - - - - - -

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 - - - - - - - -

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 - - - - - - - -

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 - - - - - - - -

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 1.00 100.00 1.74 - - 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 - - - - - - - -

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 - - - - - - - -

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 - - - - - - - -

JUMLAH 31,585,975.67 100.00 18.68 17.25 35.93

PPN 11% 3,474,457.32 RENCANA SAMPAI MINGGU INI 19.74

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI MINGGU INI 35.93

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 16.19

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : III (Tiga)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 25 Juli s/d 31 Juli 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 1.00 100.00 0.47 - - 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 1.00 100.00 0.79 - - 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 1.00 100.00 1.11 - - 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 1.00 100.00 1.52 - - 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 1.50 100.00 0.41 - - 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 0.30 100.00 0.22 - - 0.30 100.00 0.22

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 0.15 100.00 0.48 - - 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 3.36 100.00 2.82 - - 3.36 100.00 2.82

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 6.72 100.00 1.56 - - 6.72 100.00 1.56

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 0.45 100.00 0.09 - - 0.45 100.00 0.09

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 50.00 100.00 3.48 - - 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 67.50 100.00 4.93 - - 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 6.00 100.00 1.90 - - 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 0.45 100.00 1.62 - - 0.45 100.00 1.62

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 100.80 100.00 7.37 - - 100.80 100.00 7.37
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 8.96 100.00 3.00 - - 8.96 100.00 3.00

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 0.67 100.00 2.42 - - 0.67 100.00 2.42

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 - - - 141.75 100.00 10.36 141.75 100.00 10.36

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 - - - 10.50 100.00 5.75 10.50 100.00 5.75

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 - - - 0.95 100.00 3.42 0.95 100.00 3.42

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 - - - - - - - -

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 - - - - - - - -

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 - - - - - - - -

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 - - - - - - - -

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 1.00 100.00 1.74 - - 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 - - - - - - - -

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 - - - - - - - -

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 - - - - - - - -

JUMLAH 31,585,975.67 100.00 35.93 19.54 55.47

PPN 11% 3,474,457.32 RENCANA SAMPAI MINGGU INI 26.54

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI MINGGU INI 55.47

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 28.93

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : IV (Empat)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 01 Agustus s/d 07 Agustus 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 1.00 100.00 0.47 - - 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 1.00 100.00 0.79 - - 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 1.00 100.00 1.11 - - 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 1.00 100.00 1.52 - - 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 1.50 100.00 0.41 - - 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 0.30 100.00 0.22 - - 0.30 100.00 0.22

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 0.15 100.00 0.48 - - 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 3.36 100.00 2.82 - - 3.36 100.00 2.82

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 6.72 100.00 1.56 - - 6.72 100.00 1.56

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 0.45 100.00 0.09 - - 0.45 100.00 0.09

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 50.00 100.00 3.48 - - 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 67.50 100.00 4.93 - - 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 6.00 100.00 1.90 - - 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 0.45 100.00 1.62 - - 0.45 100.00 1.62

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 100.80 100.00 7.37 - - 100.80 100.00 7.37
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 8.96 100.00 3.00 - - 8.96 100.00 3.00

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 0.67 100.00 2.42 - - 0.67 100.00 2.42

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 141.75 100.00 10.36 - - 141.75 100.00 10.36

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 10.50 100.00 5.75 - - 10.50 100.00 5.75

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 0.95 100.00 3.42 - - 0.95 100.00 3.42

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 - - - 31.08 100.00 12.66 31.08 100.00 12.66

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 - - - 18.00 100.00 8.25 18.00 100.00 8.25

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 - - - 31.08 50.00 7.20 31.08 50.00 7.20

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 - - - - - - - -

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 1.00 100.00 1.74 - - 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 - - - - - - - -

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 - - - - - - - -

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 - - - - - - - -

JUMLAH 31,585,975.67 100.00 55.47 28.11 83.58

PPN 11% 3,474,457.32 RENCANA SAMPAI MINGGU INI 33.34

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI MINGGU INI 83.58

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 50.24

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : V (Lima)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 08 Agustus s/d 12 Agustus 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 1.00 100.00 0.47 - - 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 1.00 100.00 0.79 - - 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 1.00 100.00 1.11 - - 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 1.00 100.00 1.52 - - 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 1.50 100.00 0.41 - - 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 0.30 100.00 0.22 - - 0.30 100.00 0.22

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 0.15 100.00 0.48 - - 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 3.36 100.00 2.82 - - 3.36 100.00 2.82

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 6.72 100.00 1.56 - - 6.72 100.00 1.56

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 0.45 100.00 0.09 - - 0.45 100.00 0.09

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 50.00 100.00 3.48 - - 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 67.50 100.00 4.93 - - 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 6.00 100.00 1.90 - - 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 0.45 100.00 1.62 - - 0.45 100.00 1.62

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 100.80 100.00 7.37 - - 100.80 100.00 7.37
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 8.96 100.00 3.00 - - 8.96 100.00 3.00

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 0.67 100.00 2.42 - - 0.67 100.00 2.42

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 141.75 100.00 10.36 - - 141.75 100.00 10.36

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 10.50 100.00 5.75 - - 10.50 100.00 5.75

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 0.95 100.00 3.42 - - 0.95 100.00 3.42

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 31.08 100.00 12.66 - - 31.08 100.00 12.66

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 18.00 100.00 8.25 - - 18.00 100.00 8.25

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 31.08 50.00 7.20 31.08 50.00 7.20 62.16 100.00 14.40

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 - - - 23.52 100.00 3.31 23.52 100.00 3.31

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 1.00 100.00 1.74 - - 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 - - - 8.40 100.00 0.65 8.40 100.00 0.65

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 - - - 62.16 100.00 4.78 62.16 100.00 4.78

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 - - - 1.00 100.00 0.47 1.00 100.00 0.47

JUMLAH 31,585,975.67 100.00 83.58 16.42 100.00

PPN 11% 3,474,457.32 RENCANA SAMPAI MINGGU INI 40.13

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI MINGGU INI 100.00

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 59.87

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : VI (Enam)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 15 Juni s/d 19 Juni 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 150,000.00 150,000.00 0.47 1.00 100.00 0.47 - - 1.00 100.00 0.47

- Pek. Pas Papan Nama Kegiatan Ls 1.00 250,000.00 250,000.00 0.79 1.00 100.00 0.79 - - 1.00 100.00 0.79

- Pek. Pengadaan K3 Kontruksi Ls 1.00 350,000.00 350,000.00 1.11 1.00 100.00 1.11 - - 1.00 100.00 1.11

- Pek. Pas. Bouwplank Ls 1.00 480,000.00 480,000.00 1.52 1.00 100.00 1.52 - - 1.00 100.00 1.52

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 1.50 86,625.00 129,937.50 0.41 1.50 100.00 0.41 - - 1.50 100.00 0.41

- Pek. Urugan Pasir Di Bawah Pondasi M3 0.30 230,010.00 69,003.00 0.22 0.15 50.00 0.11 - - 0.15 50.00 0.11

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.15 1,000,467.29 150,070.09 0.48 0.15 100.00 0.48 - - 0.15 100.00 0.48

- Pek. Pas Pondasi Pas. 1 Bata M2 3.36 264,954.80 890,248.13 2.82 3.36 100.00 2.82 - - 3.36 100.00 2.82

- Pek. Rapen Pondasi M2 6.72 73,188.72 491,828.20 1.56 6.72 100.00 1.56 - - 6.72 100.00 1.56

- Pek. Urugan Tanah Bekas Galian M3 0.45 63,250.00 28,462.50 0.09 0.45 100.00 0.09 - - 0.45 100.00 0.09

- Pek. Pas. Kayu Cerocok Dia 10 cm Btg 50.00 22,000.00 1,100,000.00 3.48 50.00 100.00 3.48 - - 50.00 100.00 3.48

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 67.50 23,091.20 1,558,656.00 4.93 67.50 100.00 4.93 - - 67.50 100.00 4.93

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 6.00 100,116.50 600,699.00 1.90 6.00 100.00 1.90 - - 6.00 100.00 1.90

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 0.45 1,138,575.25 512,358.86 1.62 100.80 ### 363.35 - - 100.80 ### 363.35

- Pek. Pembesian Balok Sloof Kg 100.80 23,091.20 2,327,592.96 7.37 8.96 8.89 0.66 - - 8.96 8.89 0.66
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Bekisting Balok Sloof 2 x Pakai M2 8.96 105,754.00 947,555.84 3.00 8.96 100.00 3.00 - - 8.96 100.00 3.00

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 0.67 1,138,575.25 762,845.42 2.42 0.67 100.00 2.42 - - 0.67 100.00 2.42

- Pek. Pembesian Kolom Kg 141.75 23,091.20 3,273,177.60 10.36 141.75 100.00 10.36 - - 141.75 100.00 10.36

- Pek. Bekisting Kolom 2 x Pakai M2 10.50 172,924.13 1,815,703.31 5.75 10.50 100.00 5.75 - - 10.50 100.00 5.75

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 0.95 1,138,575.25 1,081,646.49 3.42 0.95 100.00 3.42 - - 0.95 100.00 3.42

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 31.08 128,627.40 3,997,739.59 12.66 31.08 100.00 12.66 - - 31.08 100.00 12.66

- Pek. Ring Balok Beton M1 18.00 144,826.00 2,606,868.00 8.25 18.00 100.00 8.25 - - 18.00 100.00 8.25

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 62.16 73,188.72 4,549,410.84 14.40 62.16 100.00 14.40 - - 62.16 100.00 14.40

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 23.52 44,506.00 1,046,781.12 3.31 23.52 100.00 3.31 - - 23.52 100.00 3.31

- Pek. Pas Gorong-gorong Dia. 60 cm M1 1.00 550,000.00 550,000.00 1.74 1.00 100.00 1.74 - - 1.00 100.00 1.74

V. PEKERJAAN PENGECATAN SAMPING DAN BELAKANG

- Pek. Cat Kolom + Sloof dengan Cat Air M2 8.40 24,311.10 204,213.24 0.65 8.40 100.00 0.65 8.40 100.00 0.65 16.80 200.00 1.29

- Pek. Cat Dinding dengan Cat Air M2 62.16 24,311.10 1,511,177.98 4.78 62.16 100.00 4.78 - - 62.16 100.00 4.78

- Pek. Pembersihan Akhir Ls 1.00 150,000.00 150,000.00 0.47 1.00 100.00 0.47 1.00 100.00 0.47 2.00 200.00 0.95

JUMLAH 31,585,975.67 100.00 454.91 1.12 456.03

PPN 11% 3,474,457.32 RENCANA SAMPAI MINGGU INI 46.93

TOTAL BIAYA 35,060,432.99 REALISASI SAMPAI MINGGU INI 456.03

DIBULATKAN 35,060,000.00 DEVIASI PEKERJAAN 409.10

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : VII (Tujuh)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 22 Juni s/d 28 Juni 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEK. PENDAHULUAN SAMPING DAN BELAKANG

- Pek. Pembersihan Lokasi Ls 1.00 850,000.00 850,000.00 0.53 1.00 100.00 0.53 - - 1.00 100.00 0.53

- Pek. Pas Papan Nama Kegiatan Ls 1.00 350,000.00 350,000.00 0.22 1.00 100.00 0.22 - - 1.00 100.00 0.22

- Pek. Pengadaan K3 Ls 1.00 1,000,000.00 1,000,000.00 0.63 1.00 100.00 0.63 - - 1.00 100.00 0.63

- Pek. Pas Bouwplank Ls 1.00 1,100,000.00 1,100,000.00 0.69 1.00 100.00 0.69 - - 1.00 100.00 0.69

II. PEKERJAAN PONDASI SAMPING DAN BELAKANG

- Pek. Galian Tanah Pondasi M3 9.90 86,625.00 857,587.50 0.54 1.50 15.15 0.08 - - 1.50 15.15 0.08

- Pek. Urugan Pasir di Bawah Pondasi M3 1.98 230,010.00 455,419.80 0.29 0.15 7.58 0.02 - - 0.15 7.58 0.02

- Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) M3 0.99 1,000,467.29 990,462.61 0.62 3.36 339.39 2.11 - - 3.36 339.39 2.11

- Pek. Pas Pondasi Pas. 1 Bata M2 17.36 264,954.80 4,599,615.33 2.89 6.72 38.71 1.12 - - 6.72 38.71 1.12

- Pek. Rapen Pondasi M2 34.72 73,188.72 2,541,112.36 1.60 0.45 1.30 0.02 - - 0.45 1.30 0.02

- Pek. Urugan Tanah Bekas Galian M3 2.97 63,250.00 187,852.50 0.12 50.00 1,683.50 1.99 - - 50.00 1,683.50 1.99

III. PEKERJAAN STRUKTUR SAMPING DAN BELAKANG

- Pek. Pembesian Pondasi Setempat Kg 445.50 23,091.20 10,287,129.60 6.47 67.50 15.15 0.98 - - 67.50 15.15 0.98

- Pek. Bekisting Pondasi Setempat 2 x Pakai M2 39.60 100,116.50 3,964,613.40 2.49 6.00 15.15 0.38 - - 6.00 15.15 0.38

- Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) M3 2.97 1,138,575.25 3,381,568.50 2.13 100.80 3,393.94 72.16 - - 100.80 3,393.94 72.16

- Pek. Pembesian Balok Sloof Kg 520.80 23,091.20 12,025,896.96 7.56 8.96 1.72 0.13 - - 8.96 1.72 0.13

- Pek. Bekisting Balok Sloof 2 x Pakai M2 46.29 105,754.00 4,895,352.66 3.08 0.67 1.45 0.04 - - 0.67 1.45 0.04
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

- Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) M3 3.47 1,138,575.25 3,950,856.13 2.48 141.75 4,085.01 101.48 - - 141.75 4,085.01 101.48

- Pek. Pembesian Kolom Kg 935.55 23,091.20 21,602,972.16 13.58 10.50 1.12 0.15 - - 10.50 1.12 0.15

- Pek. Bekisting Kolom 2 x Pakai M2 69.30 172,924.13 11,983,641.86 7.53 0.95 1.37 0.10 - - 0.95 1.37 0.10

- Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) M3 6.24 1,138,575.25 7,104,709.58 4.47 - - - - - - - -

IV. PEKERJAAN DINDING SAMPING DAN BELAKANG

- Pek. Pas Dinding 1/2 Bata, 1 : 4 M2 143.22 128,627.40 18,422,016.23 11.58 18.00 12.57 1.46 - - 18.00 12.57 1.46

- Pek. Ring Balok Beton M1 93.00 144,826.00 13,468,818.00 8.47 62.16 66.84 5.66 - - 62.16 66.84 5.66

- Pek. Plesteran Dinding 1 : 4 Tebal 20 mm M2 286.44 73,188.72 20,964,176.96 13.18 23.52 8.21 1.08 - - 23.52 8.21 1.08

- Pek. Adverking Beton 1 : 3 Tebal 20 mm M2 125.64 44,506.00 5,591,733.84 3.52 1.00 0.80 0.03 125.64 100.00 3.52 126.64 100.80 3.54

V PEKERJAAN PENGECATAN SAMPING DAN BELAKANG

- Pek. Cat Kolom + Sloof Dengan Cat Air M2 47.52 24,311.10 1,155,263.47 0.73 16.80 35.35 0.26 47.52 100.00 0.73 64.32 135.35 0.98

- Pek. Cat Dinding Dengan Cat Air M2 286.44 24,311.10 6,963,671.48 4.38 62.16 21.70 0.95 286.44 100.00 4.38 348.60 121.70 5.33

- Pek. Pembersihan Akhir Ls 1.00 350,000.00 350,000.00 0.22 2.00 200.00 0.44 1.00 100.00 0.22 3.00 300.00 0.66

JUMLAH 159,044,470.94 100.00 192.72 8.84 201.56

PPN 11% 17,494,891.80 RENCANA SAMPAI MINGGU INI 60.45

TOTAL BIAYA 176,539,362.75 REALISASI SAMPAI MINGGU INI 201.56

DIBULATKAN 176,539,362.00 DEVIASI PEKERJAAN 141.11

Disetujui Oleh : Diketahui oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Direksi / Tenaga Ahli Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan Jumlah Harga (Rp)
NO Uraian Pekerjaan Satuan Volume Bobot (%)
(Rp)
Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI RAHMAD HIDAYAT ISYKARIMAN EMIL MUPLI


NIP. 19780821 200801 1 007
NIP. 19810204 200801 1 011 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : VIII (Delapan)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 29 Juni s/d 05 Juli 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00 0.31 - - - - - - - -

2 Pasang Bouwplank/Pengukuran Ls 1.00 300,000.00 300,000.00 0.31 1.00 100.00 0.31 - - 1.00 100.00 0.31

3 Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

4 Pek. Pengadaan Perlengkapan K-3 Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

II. PEKERJAAN PONDASI

1 Galian Tanah M3 2.77 86,625.00 239,951.25 0.25 - - - - - - - -

2 Urugan Tanah kembali bekas galian M3 0.83 63,250.00 52,497.50 0.05 1.50 180.72 0.10 - - 1.50 180.72 0.10

3 Urugan Pasir 5 cm M3 0.34 230,010.00 78,203.40 0.08 0.15 44.12 0.04 - - 0.15 44.12 0.04

4 Pek. Pond. Lajur Pas. 1 Bata Adukan 1 : 4 M2 12.29 264,954.80 3,256,294.49 3.35 3.36 27.34 0.92 - - 3.36 27.34 0.92

5 Pek. Berapen Rollag Bata M2 24.57 42,852.83 1,052,894.08 1.08 6.72 27.35 0.30 - - 6.72 27.35 0.30

III. PEKERJAAN STRUKTUR

1 Pek. Pondasi Tapak Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.29 820,418.41 237,921.34 0.24 - - - - - - - -

- Besi Beton Polos Kg 23.10 19,287.00 445,529.70 0.46 67.50 292.21 1.34 - - 67.50 292.21 1.34

2 Pek. Sloof Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.82 1,138,575.25 933,631.71 0.96 100.80 ### 118.10 - - 100.80 ### 118.10

- Besi Beton Polos Kg 87.58 23,091.20 2,022,327.30 2.08 8.96 10.23 0.21 - - 8.96 10.23 0.21

- Bekisting Multiplek M2 5.46 211,508.00 1,154,833.68 1.19 0.67 12.27 0.15 - - 0.67 12.27 0.15

3 Pek. Kolom Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.42 1,138,575.25 478,201.61 0.49 10.50 ### 12.30 - - 10.50 ### 12.30

- Besi Beton Polos Kg 42.84 23,091.20 989,227.01 1.02 0.95 2.22 0.02 - - 0.95 2.22 0.02

- Bekisting Multiplek 2 x Pakai M2 4.90 345,848.25 1,694,656.43 1.74 - - - - - - - -

4 Pek. Ring Balok Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.18 1,138,575.25 204,943.55 0.21 - - - - - - - -

- Besi Beton Polos Kg 19.25 23,091.20 444,505.60 0.46 18.00 93.51 0.43 - - 18.00 93.51 0.43

- Bekisting Multiplek M2 1.65 354,741.75 585,323.89 0.60 62.16 ### 22.69 - - 62.16 ### 22.69

5 Pek. Plat Beton Bertulang T. 12 cm

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.22 1,138,575.25 250,486.56 0.26 126.64 ### 148.37 - - 126.64 ### 148.37

- Besi Beton Polos Kg 18.51 23,091.20 427,418.11 0.44 - - - - - - - -

- Bekisting Multiplek M2 1.82 376,648.25 685,499.82 0.71 - - - - - - - -

6 Pek. Kolom Praktis Beton Bertulang KP 11 x 11 M1 23.85 114,362.60 2,727,548.01 2.81 64.32 269.69 7.57 - - 64.32 269.69 7.57

7 Pek. Ring Balok Beton Bertulang 10 x 15 cm M1 21.30 144,826.00 3,084,793.80 3.17 348.60 ### 51.95 - - 348.60 ### 51.95

IV. PEKERJAAN DINDING

1 Pek. Dinding Pas. 1/2 Bata Camp. 1 : 4 M2 67.66 128,627.40 8,702,929.88 8.96 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Plester Dinding T. 1,5 cm Camp. 1 : 4 M2 112.77 73,188.72 8,253,491.95 8.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Dinding Keramik 20 x 25 cm M2 22.56 277,349.17 6,256,997.30 6.44 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

V. PEKERJAAN LANTAI

1 Pek. Urugan Tanah Bawah Lantai M3 6.51 120,065.00 781,623.15 0.80 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Urugan Pasir M3 1.05 230,010.00 241,510.50 0.25 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cor Lantai Kerja Beton K-100 M3 1.05 1,000,467.29 1,050,490.65 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Lantai Keramik 25 x 25 cm M2 15.40 170,624.85 2,627,622.69 2.70 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Acian Selasar M3 5.60 44,506.00 249,233.60 0.26 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VI. PEKERJAAN PLAFOND

1 Pek. Plafond Triplek 4 mm M2 27.40 64,881.58 1,777,755.16 1.83 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Rangka Plafond Kayu Kelas II M2 27.40 124,331.35 3,406,678.99 3.51 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. List Profil Kayu M3 59.22 16,706.53 989,360.41 1.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VII. PEKERJAAN KUSEN PINTU, JENDELA

1 Pek. KusenJendela Kayu Kelas II M3 0.15 7,007,660.00 1,051,149.00 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pintu Fiber KM/WC Lengkap Aksesoris Unit 4.00 762,500.00 3,050,000.00 3.14 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Daun Pintu Panel Kayu Kelas II M2 3.04 696,685.00 2,117,922.40 2.18 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Kaca Ventilasi 5 mm M2 3.28 152,817.50 501,241.40 0.52 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

5 Pek. Pas. Kunci Tanam Bh 2.00 143,165.00 286,330.00 0.29 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. Pas. Ensel Pintu Bh 6.00 15,427.50 92,565.00 0.10 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Pas. Grendel Pintu Bh 2.00 15,427.50 30,855.00 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding dengan Cat Air M2 112.77 24,311.10 2,741,562.75 2.82 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pengecatan Plafond dengan Cat Air M2 27.40 24,311.10 666,124.14 0.69 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cat Minyak Kayu Kusen, Pintu dan Jendela M2 12.36 51,629.33 638,138.46 0.66 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Cat Minyak List Profil Kayu M2 1.78 51,629.33 91,900.20 0.09 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Cat Minyak List Plank M2 8.04 51,629.33 415,099.77 0.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

IX. PEKERJAAN ATAP

1 Pek. Kayu Kuda-kuda Kelas II M3 0.41 5,892,194.00 2,415,799.54 2.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Gording Kayu Kelas II M3 0.26 4,908,970.00 1,276,332.20 1.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Atap Longspan/Spandek 0,3 mm M2 45.04 106,554.80 4,799,228.19 4.94 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Perabung Atap Longspan M1 7.75 45,766.60 354,691.15 0.36 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Bola-bola Atap M1 12.00 45,766.60 549,199.20 0.57 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. List Plank Papan + Anak M1 26.80 76,665.60 2,054,638.08 2.11 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Atap Canopy (Longspan + Rangka besi Holl M2 0.96 532,400.00 511,104.00 0.53 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

X. PEKERJAAN ELEKTRIKAL

1 Pek. Instalasi Titik Lampu Bh 8.00 180,000.00 1,440,000.00 1.48 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Instalasi Titik Stop Kontak Bh 1.00 180,000.00 180,000.00 0.19 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Saklar Tunggal Bh 4.00 15,200.00 60,800.00 0.06 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. Stop Kontak Bh 1.00 20,200.00 20,200.00 0.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Lampu Save Energy 24 Watt Bh 8.00 60,200.00 481,600.00 0.50 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. MCB Bh 1.00 66,200.00 66,200.00 0.07 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XI. PEKERJAAN SANITASI

1 Pek. Air Bersih

- Pek. Sumur Bor Unit 1.00 1,800,000.00 1,800,000.00 1.85 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Mesin Air Semi Jet Pump Unit 1.00 750,000.00 750,000.00 0.77 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pemasangan Pipa PVC 3 /4" M1 18.00 16,572.60 298,306.80 0.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Kran Air Ø 3/4" Unit 8.00 24,337.50 194,700.00 0.20 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Tangki Plastik 1000 Liter Lengkap Aksesoris Unit 1.00 1,828,500.00 1,828,500.00 1.88 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Air Kotor

- Pek. Pas. Closet Jongkok Unit 4.00 545,274.33 2,181,097.33 2.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Floor Drain Plastik Unit 6.00 24,337.50 146,025.00 0.15 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Kotoran Ringan) M1 18.00 50,242.50 904,365.00 0.93 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 4 " (Kotoran Padat) M1 12.00 116,160.00 1,393,920.00 1.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Pembuangan air Hujan) M1 3.00 50,242.50 150,727.50 0.16 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Septiktank

- Galian Tanah M3 5.25 86,625.00 454,781.25 0.47 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Urugan Pasir 5 cm M3 0.12 230,010.00 27,601.20 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Lantai Kerja Beton Mutu K 100 (10 cm) M3 0.23 1,000,467.29 230,107.48 0.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas 1/2 Bata Camp. 1 : 2 M2 11.55 141,581.00 1,635,260.55 1.68 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Plesteran Dinding Camp. 1 : 2 M2 11.55 79,899.95 922,844.45 0.95 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Plat Tutup Septic Tank Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-100) T. 13 cm M3 0.39 1,000,467.29 390,182.24 0.40 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Besi Beton Polos Kg 24.37 23,091.20 562,732.54 0.58 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Bekisting Multiplek M2 1.17 376,648.25 440,678.45 0.45 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XII. PEKERJAAN LAIN-LAIN

1 Pek. Pembersihan Akhir Unit 1.00 290,000.00 290,000.00 0.30 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

JUMLAH 97,178,893.37 100.00 Err:509 - Err:509

PPN 11% 10,689,678.27 RENCANA SAMPAI MINGGU INI 38.92

TOTAL BIAYA 107,868,571.64 REALISASI SAMPAI MINGGU INI Err:509

DIBULATKAN 107,868,000.00 DEVIASI PEKERJAAN Err:509

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI ISYKARIMAN EMIL MUPLI


NIP. 19670817 199103 1 010 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : IX (Sembilan)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 06 Juli s/d 12 Juli 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00 0.31 - - - - - - - -

2 Pasang Bouwplank/Pengukuran Ls 1.00 300,000.00 300,000.00 0.31 1.00 100.00 0.31 - - 1.00 100.00 0.31

3 Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

4 Pek. Pengadaan Perlengkapan K-3 Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

II. PEKERJAAN PONDASI

1 Galian Tanah M3 2.77 86,625.00 239,951.25 0.25 - - - - - - - -

2 Urugan Tanah kembali bekas galian M3 0.83 63,250.00 52,497.50 0.05 1.50 180.72 0.10 - - 1.50 180.72 0.10

3 Urugan Pasir 5 cm M3 0.34 230,010.00 78,203.40 0.08 0.15 44.12 0.04 - - 0.15 44.12 0.04

4 Pek. Pond. Lajur Pas. 1 Bata Adukan 1 : 4 M2 12.29 264,954.80 3,256,294.49 3.35 3.36 27.34 0.92 - - 3.36 27.34 0.92

5 Pek. Berapen Rollag Bata M2 24.57 42,852.83 1,052,894.08 1.08 6.72 27.35 0.30 - - 6.72 27.35 0.30

III. PEKERJAAN STRUKTUR

1 Pek. Pondasi Tapak Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.29 820,418.41 237,921.34 0.24 - - - - - - - -

- Besi Beton Polos Kg 23.10 19,287.00 445,529.70 0.46 67.50 292.21 1.34 - - 67.50 292.21 1.34

2 Pek. Sloof Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.82 1,138,575.25 933,631.71 0.96 100.80 ### 118.10 - - 100.80 ### 118.10

- Besi Beton Polos Kg 87.58 23,091.20 2,022,327.30 2.08 8.96 10.23 0.21 - - 8.96 10.23 0.21

- Bekisting Multiplek M2 5.46 211,508.00 1,154,833.68 1.19 0.67 12.27 0.15 - - 0.67 12.27 0.15

3 Pek. Kolom Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.42 1,138,575.25 478,201.61 0.49 10.50 ### 12.30 - - 10.50 ### 12.30

- Besi Beton Polos Kg 42.84 23,091.20 989,227.01 1.02 0.95 2.22 0.02 - - 0.95 2.22 0.02

- Bekisting Multiplek 2 x Pakai M2 4.90 345,848.25 1,694,656.43 1.74 - - - - - - - -

4 Pek. Ring Balok Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.18 1,138,575.25 204,943.55 0.21 - - - - - - - -

- Besi Beton Polos Kg 19.25 23,091.20 444,505.60 0.46 18.00 93.51 0.43 - - 18.00 93.51 0.43

- Bekisting Multiplek M2 1.65 354,741.75 585,323.89 0.60 62.16 ### 22.69 - - 62.16 ### 22.69

5 Pek. Plat Beton Bertulang T. 12 cm

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.22 1,138,575.25 250,486.56 0.26 126.64 ### 148.37 - - 126.64 ### 148.37

- Besi Beton Polos Kg 18.51 23,091.20 427,418.11 0.44 - - - - - - - -

- Bekisting Multiplek M2 1.82 376,648.25 685,499.82 0.71 - - - - - - - -

6 Pek. Kolom Praktis Beton Bertulang KP 11 x 11 M1 23.85 114,362.60 2,727,548.01 2.81 64.32 269.69 7.57 - - 64.32 269.69 7.57

7 Pek. Ring Balok Beton Bertulang 10 x 15 cm M1 21.30 144,826.00 3,084,793.80 3.17 348.60 ### 51.95 - - 348.60 ### 51.95

IV. PEKERJAAN DINDING

1 Pek. Dinding Pas. 1/2 Bata Camp. 1 : 4 M2 67.66 128,627.40 8,702,929.88 8.96 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Plester Dinding T. 1,5 cm Camp. 1 : 4 M2 112.77 73,188.72 8,253,491.95 8.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Dinding Keramik 20 x 25 cm M2 22.56 277,349.17 6,256,997.30 6.44 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

V. PEKERJAAN LANTAI

1 Pek. Urugan Tanah Bawah Lantai M3 6.51 120,065.00 781,623.15 0.80 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Urugan Pasir M3 1.05 230,010.00 241,510.50 0.25 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cor Lantai Kerja Beton K-100 M3 1.05 1,000,467.29 1,050,490.65 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Lantai Keramik 25 x 25 cm M2 15.40 170,624.85 2,627,622.69 2.70 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Acian Selasar M3 5.60 44,506.00 249,233.60 0.26 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VI. PEKERJAAN PLAFOND

1 Pek. Plafond Triplek 4 mm M2 27.40 64,881.58 1,777,755.16 1.83 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Rangka Plafond Kayu Kelas II M2 27.40 124,331.35 3,406,678.99 3.51 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. List Profil Kayu M3 59.22 16,706.53 989,360.41 1.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VII. PEKERJAAN KUSEN PINTU, JENDELA

1 Pek. KusenJendela Kayu Kelas II M3 0.15 7,007,660.00 1,051,149.00 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pintu Fiber KM/WC Lengkap Aksesoris Unit 4.00 762,500.00 3,050,000.00 3.14 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Daun Pintu Panel Kayu Kelas II M2 3.04 696,685.00 2,117,922.40 2.18 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Kaca Ventilasi 5 mm M2 3.28 152,817.50 501,241.40 0.52 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

5 Pek. Pas. Kunci Tanam Bh 2.00 143,165.00 286,330.00 0.29 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. Pas. Ensel Pintu Bh 6.00 15,427.50 92,565.00 0.10 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Pas. Grendel Pintu Bh 2.00 15,427.50 30,855.00 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding dengan Cat Air M2 112.77 24,311.10 2,741,562.75 2.82 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pengecatan Plafond dengan Cat Air M2 27.40 24,311.10 666,124.14 0.69 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cat Minyak Kayu Kusen, Pintu dan Jendela M2 12.36 51,629.33 638,138.46 0.66 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Cat Minyak List Profil Kayu M2 1.78 51,629.33 91,900.20 0.09 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Cat Minyak List Plank M2 8.04 51,629.33 415,099.77 0.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

IX. PEKERJAAN ATAP

1 Pek. Kayu Kuda-kuda Kelas II M3 0.41 5,892,194.00 2,415,799.54 2.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Gording Kayu Kelas II M3 0.26 4,908,970.00 1,276,332.20 1.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Atap Longspan/Spandek 0,3 mm M2 45.04 106,554.80 4,799,228.19 4.94 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Perabung Atap Longspan M1 7.75 45,766.60 354,691.15 0.36 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Bola-bola Atap M1 12.00 45,766.60 549,199.20 0.57 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. List Plank Papan + Anak M1 26.80 76,665.60 2,054,638.08 2.11 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Atap Canopy (Longspan + Rangka besi Holl M2 0.96 532,400.00 511,104.00 0.53 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

X. PEKERJAAN ELEKTRIKAL

1 Pek. Instalasi Titik Lampu Bh 8.00 180,000.00 1,440,000.00 1.48 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Instalasi Titik Stop Kontak Bh 1.00 180,000.00 180,000.00 0.19 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Saklar Tunggal Bh 4.00 15,200.00 60,800.00 0.06 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. Stop Kontak Bh 1.00 20,200.00 20,200.00 0.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Lampu Save Energy 24 Watt Bh 8.00 60,200.00 481,600.00 0.50 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. MCB Bh 1.00 66,200.00 66,200.00 0.07 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XI. PEKERJAAN SANITASI

1 Pek. Air Bersih

- Pek. Sumur Bor Unit 1.00 1,800,000.00 1,800,000.00 1.85 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Mesin Air Semi Jet Pump Unit 1.00 750,000.00 750,000.00 0.77 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pemasangan Pipa PVC 3 /4" M1 18.00 16,572.60 298,306.80 0.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Kran Air Ø 3/4" Unit 8.00 24,337.50 194,700.00 0.20 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Tangki Plastik 1000 Liter Lengkap Aksesoris Unit 1.00 1,828,500.00 1,828,500.00 1.88 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Air Kotor

- Pek. Pas. Closet Jongkok Unit 4.00 545,274.33 2,181,097.33 2.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Floor Drain Plastik Unit 6.00 24,337.50 146,025.00 0.15 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Kotoran Ringan) M1 18.00 50,242.50 904,365.00 0.93 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 4 " (Kotoran Padat) M1 12.00 116,160.00 1,393,920.00 1.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Pembuangan air Hujan) M1 3.00 50,242.50 150,727.50 0.16 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Septiktank

- Galian Tanah M3 5.25 86,625.00 454,781.25 0.47 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Urugan Pasir 5 cm M3 0.12 230,010.00 27,601.20 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Lantai Kerja Beton Mutu K 100 (10 cm) M3 0.23 1,000,467.29 230,107.48 0.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas 1/2 Bata Camp. 1 : 2 M2 11.55 141,581.00 1,635,260.55 1.68 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Plesteran Dinding Camp. 1 : 2 M2 11.55 79,899.95 922,844.45 0.95 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Plat Tutup Septic Tank Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-100) T. 13 cm M3 0.39 1,000,467.29 390,182.24 0.40 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Besi Beton Polos Kg 24.37 23,091.20 562,732.54 0.58 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Bekisting Multiplek M2 1.17 376,648.25 440,678.45 0.45 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XII. PEKERJAAN LAIN-LAIN

1 Pek. Pembersihan Akhir Unit 1.00 290,000.00 290,000.00 0.30 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

JUMLAH 97,178,893.37 100.00 Err:509 - Err:509

PPN 11% 10,689,678.27 RENCANA SAMPAI MINGGU INI 53.04

TOTAL BIAYA 107,868,571.64 REALISASI SAMPAI MINGGU INI Err:509

DIBULATKAN 107,868,000.00 DEVIASI PEKERJAAN Err:509

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI ISYKARIMAN EMIL MUPLI


NIP. 19670817 199103 1 010 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : X (Sepuluh)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 13 Juli s/d 19 Juli 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00 0.31 - - - - - - - -

2 Pasang Bouwplank/Pengukuran Ls 1.00 300,000.00 300,000.00 0.31 1.00 100.00 0.31 - - 1.00 100.00 0.31

3 Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

4 Pek. Pengadaan Perlengkapan K-3 Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

II. PEKERJAAN PONDASI

1 Galian Tanah M3 2.77 86,625.00 239,951.25 0.25 - - - - - - - -

2 Urugan Tanah kembali bekas galian M3 0.83 63,250.00 52,497.50 0.05 1.50 180.72 0.10 - - 1.50 180.72 0.10

3 Urugan Pasir 5 cm M3 0.34 230,010.00 78,203.40 0.08 0.15 44.12 0.04 - - 0.15 44.12 0.04

4 Pek. Pond. Lajur Pas. 1 Bata Adukan 1 : 4 M2 12.29 264,954.80 3,256,294.49 3.35 3.36 27.34 0.92 - - 3.36 27.34 0.92

5 Pek. Berapen Rollag Bata M2 24.57 42,852.83 1,052,894.08 1.08 6.72 27.35 0.30 - - 6.72 27.35 0.30

III. PEKERJAAN STRUKTUR

1 Pek. Pondasi Tapak Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.29 820,418.41 237,921.34 0.24 - - - - - - - -

- Besi Beton Polos Kg 23.10 19,287.00 445,529.70 0.46 67.50 292.21 1.34 - - 67.50 292.21 1.34

2 Pek. Sloof Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.82 1,138,575.25 933,631.71 0.96 100.80 ### 118.10 - - 100.80 ### 118.10

- Besi Beton Polos Kg 87.58 23,091.20 2,022,327.30 2.08 8.96 10.23 0.21 - - 8.96 10.23 0.21

- Bekisting Multiplek M2 5.46 211,508.00 1,154,833.68 1.19 0.67 12.27 0.15 - - 0.67 12.27 0.15

3 Pek. Kolom Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.42 1,138,575.25 478,201.61 0.49 10.50 ### 12.30 - - 10.50 ### 12.30

- Besi Beton Polos Kg 42.84 23,091.20 989,227.01 1.02 0.95 2.22 0.02 - - 0.95 2.22 0.02

- Bekisting Multiplek 2 x Pakai M2 4.90 345,848.25 1,694,656.43 1.74 - - - - - - - -

4 Pek. Ring Balok Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.18 1,138,575.25 204,943.55 0.21 - - - - - - - -

- Besi Beton Polos Kg 19.25 23,091.20 444,505.60 0.46 18.00 93.51 0.43 - - 18.00 93.51 0.43

- Bekisting Multiplek M2 1.65 354,741.75 585,323.89 0.60 62.16 ### 22.69 - - 62.16 ### 22.69

5 Pek. Plat Beton Bertulang T. 12 cm

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.22 1,138,575.25 250,486.56 0.26 126.64 ### 148.37 - - 126.64 ### 148.37

- Besi Beton Polos Kg 18.51 23,091.20 427,418.11 0.44 - - - - - - - -

- Bekisting Multiplek M2 1.82 376,648.25 685,499.82 0.71 - - - - - - - -

6 Pek. Kolom Praktis Beton Bertulang KP 11 x 11 M1 23.85 114,362.60 2,727,548.01 2.81 64.32 269.69 7.57 - - 64.32 269.69 7.57

7 Pek. Ring Balok Beton Bertulang 10 x 15 cm M1 21.30 144,826.00 3,084,793.80 3.17 348.60 ### 51.95 - - 348.60 ### 51.95

IV. PEKERJAAN DINDING

1 Pek. Dinding Pas. 1/2 Bata Camp. 1 : 4 M2 67.66 128,627.40 8,702,929.88 8.96 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Plester Dinding T. 1,5 cm Camp. 1 : 4 M2 112.77 73,188.72 8,253,491.95 8.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Dinding Keramik 20 x 25 cm M2 22.56 277,349.17 6,256,997.30 6.44 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

V. PEKERJAAN LANTAI

1 Pek. Urugan Tanah Bawah Lantai M3 6.51 120,065.00 781,623.15 0.80 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Urugan Pasir M3 1.05 230,010.00 241,510.50 0.25 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cor Lantai Kerja Beton K-100 M3 1.05 1,000,467.29 1,050,490.65 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Lantai Keramik 25 x 25 cm M2 15.40 170,624.85 2,627,622.69 2.70 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Acian Selasar M3 5.60 44,506.00 249,233.60 0.26 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VI. PEKERJAAN PLAFOND

1 Pek. Plafond Triplek 4 mm M2 27.40 64,881.58 1,777,755.16 1.83 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Rangka Plafond Kayu Kelas II M2 27.40 124,331.35 3,406,678.99 3.51 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. List Profil Kayu M3 59.22 16,706.53 989,360.41 1.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VII. PEKERJAAN KUSEN PINTU, JENDELA

1 Pek. KusenJendela Kayu Kelas II M3 0.15 7,007,660.00 1,051,149.00 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pintu Fiber KM/WC Lengkap Aksesoris Unit 4.00 762,500.00 3,050,000.00 3.14 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Daun Pintu Panel Kayu Kelas II M2 3.04 696,685.00 2,117,922.40 2.18 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Kaca Ventilasi 5 mm M2 3.28 152,817.50 501,241.40 0.52 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

5 Pek. Pas. Kunci Tanam Bh 2.00 143,165.00 286,330.00 0.29 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. Pas. Ensel Pintu Bh 6.00 15,427.50 92,565.00 0.10 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Pas. Grendel Pintu Bh 2.00 15,427.50 30,855.00 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding dengan Cat Air M2 112.77 24,311.10 2,741,562.75 2.82 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pengecatan Plafond dengan Cat Air M2 27.40 24,311.10 666,124.14 0.69 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cat Minyak Kayu Kusen, Pintu dan Jendela M2 12.36 51,629.33 638,138.46 0.66 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Cat Minyak List Profil Kayu M2 1.78 51,629.33 91,900.20 0.09 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Cat Minyak List Plank M2 8.04 51,629.33 415,099.77 0.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

IX. PEKERJAAN ATAP

1 Pek. Kayu Kuda-kuda Kelas II M3 0.41 5,892,194.00 2,415,799.54 2.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Gording Kayu Kelas II M3 0.26 4,908,970.00 1,276,332.20 1.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Atap Longspan/Spandek 0,3 mm M2 45.04 106,554.80 4,799,228.19 4.94 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Perabung Atap Longspan M1 7.75 45,766.60 354,691.15 0.36 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Bola-bola Atap M1 12.00 45,766.60 549,199.20 0.57 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. List Plank Papan + Anak M1 26.80 76,665.60 2,054,638.08 2.11 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Atap Canopy (Longspan + Rangka besi Holl M2 0.96 532,400.00 511,104.00 0.53 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

X. PEKERJAAN ELEKTRIKAL

1 Pek. Instalasi Titik Lampu Bh 8.00 180,000.00 1,440,000.00 1.48 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Instalasi Titik Stop Kontak Bh 1.00 180,000.00 180,000.00 0.19 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Saklar Tunggal Bh 4.00 15,200.00 60,800.00 0.06 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. Stop Kontak Bh 1.00 20,200.00 20,200.00 0.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Lampu Save Energy 24 Watt Bh 8.00 60,200.00 481,600.00 0.50 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. MCB Bh 1.00 66,200.00 66,200.00 0.07 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XI. PEKERJAAN SANITASI

1 Pek. Air Bersih

- Pek. Sumur Bor Unit 1.00 1,800,000.00 1,800,000.00 1.85 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Mesin Air Semi Jet Pump Unit 1.00 750,000.00 750,000.00 0.77 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pemasangan Pipa PVC 3 /4" M1 18.00 16,572.60 298,306.80 0.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Kran Air Ø 3/4" Unit 8.00 24,337.50 194,700.00 0.20 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Tangki Plastik 1000 Liter Lengkap Aksesoris Unit 1.00 1,828,500.00 1,828,500.00 1.88 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Air Kotor

- Pek. Pas. Closet Jongkok Unit 4.00 545,274.33 2,181,097.33 2.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Floor Drain Plastik Unit 6.00 24,337.50 146,025.00 0.15 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Kotoran Ringan) M1 18.00 50,242.50 904,365.00 0.93 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 4 " (Kotoran Padat) M1 12.00 116,160.00 1,393,920.00 1.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Pembuangan air Hujan) M1 3.00 50,242.50 150,727.50 0.16 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Septiktank

- Galian Tanah M3 5.25 86,625.00 454,781.25 0.47 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Urugan Pasir 5 cm M3 0.12 230,010.00 27,601.20 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Lantai Kerja Beton Mutu K 100 (10 cm) M3 0.23 1,000,467.29 230,107.48 0.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas 1/2 Bata Camp. 1 : 2 M2 11.55 141,581.00 1,635,260.55 1.68 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Plesteran Dinding Camp. 1 : 2 M2 11.55 79,899.95 922,844.45 0.95 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Plat Tutup Septic Tank Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-100) T. 13 cm M3 0.39 1,000,467.29 390,182.24 0.40 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Besi Beton Polos Kg 24.37 23,091.20 562,732.54 0.58 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Bekisting Multiplek M2 1.17 376,648.25 440,678.45 0.45 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XII. PEKERJAAN LAIN-LAIN

1 Pek. Pembersihan Akhir Unit 1.00 290,000.00 290,000.00 0.30 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

JUMLAH 97,178,893.37 100.00 Err:509 - Err:509

PPN 11% 10,689,678.27 RENCANA SAMPAI MINGGU INI 65.41

TOTAL BIAYA 107,868,571.64 REALISASI SAMPAI MINGGU INI Err:509

DIBULATKAN 107,868,000.00 DEVIASI PEKERJAAN Err:509

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI ISYKARIMAN EMIL MUPLI


NIP. 19670817 199103 1 010 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : XI (Sebelas)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 20 Juli s/d 26 Juli 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00 0.31 - - - - - - - -

2 Pasang Bouwplank/Pengukuran Ls 1.00 300,000.00 300,000.00 0.31 1.00 100.00 0.31 - - 1.00 100.00 0.31

3 Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

4 Pek. Pengadaan Perlengkapan K-3 Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

II. PEKERJAAN PONDASI

1 Galian Tanah M3 2.77 86,625.00 239,951.25 0.25 - - - - - - - -

2 Urugan Tanah kembali bekas galian M3 0.83 63,250.00 52,497.50 0.05 1.50 180.72 0.10 - - 1.50 180.72 0.10

3 Urugan Pasir 5 cm M3 0.34 230,010.00 78,203.40 0.08 0.15 44.12 0.04 - - 0.15 44.12 0.04

4 Pek. Pond. Lajur Pas. 1 Bata Adukan 1 : 4 M2 12.29 264,954.80 3,256,294.49 3.35 3.36 27.34 0.92 - - 3.36 27.34 0.92

5 Pek. Berapen Rollag Bata M2 24.57 42,852.83 1,052,894.08 1.08 6.72 27.35 0.30 - - 6.72 27.35 0.30

III. PEKERJAAN STRUKTUR

1 Pek. Pondasi Tapak Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.29 820,418.41 237,921.34 0.24 - - - - - - - -

- Besi Beton Polos Kg 23.10 19,287.00 445,529.70 0.46 67.50 292.21 1.34 - - 67.50 292.21 1.34

2 Pek. Sloof Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.82 1,138,575.25 933,631.71 0.96 100.80 ### 118.10 - - 100.80 ### 118.10

- Besi Beton Polos Kg 87.58 23,091.20 2,022,327.30 2.08 8.96 10.23 0.21 - - 8.96 10.23 0.21

- Bekisting Multiplek M2 5.46 211,508.00 1,154,833.68 1.19 0.67 12.27 0.15 - - 0.67 12.27 0.15

3 Pek. Kolom Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.42 1,138,575.25 478,201.61 0.49 10.50 ### 12.30 - - 10.50 ### 12.30

- Besi Beton Polos Kg 42.84 23,091.20 989,227.01 1.02 0.95 2.22 0.02 - - 0.95 2.22 0.02

- Bekisting Multiplek 2 x Pakai M2 4.90 345,848.25 1,694,656.43 1.74 - - - - - - - -

4 Pek. Ring Balok Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.18 1,138,575.25 204,943.55 0.21 - - - - - - - -

- Besi Beton Polos Kg 19.25 23,091.20 444,505.60 0.46 18.00 93.51 0.43 - - 18.00 93.51 0.43

- Bekisting Multiplek M2 1.65 354,741.75 585,323.89 0.60 62.16 ### 22.69 - - 62.16 ### 22.69

5 Pek. Plat Beton Bertulang T. 12 cm

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.22 1,138,575.25 250,486.56 0.26 126.64 ### 148.37 - - 126.64 ### 148.37

- Besi Beton Polos Kg 18.51 23,091.20 427,418.11 0.44 - - - - - - - -

- Bekisting Multiplek M2 1.82 376,648.25 685,499.82 0.71 - - - - - - - -

6 Pek. Kolom Praktis Beton Bertulang KP 11 x 11 M1 23.85 114,362.60 2,727,548.01 2.81 64.32 269.69 7.57 - - 64.32 269.69 7.57

7 Pek. Ring Balok Beton Bertulang 10 x 15 cm M1 21.30 144,826.00 3,084,793.80 3.17 348.60 ### 51.95 - - 348.60 ### 51.95

IV. PEKERJAAN DINDING

1 Pek. Dinding Pas. 1/2 Bata Camp. 1 : 4 M2 67.66 128,627.40 8,702,929.88 8.96 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Plester Dinding T. 1,5 cm Camp. 1 : 4 M2 112.77 73,188.72 8,253,491.95 8.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Dinding Keramik 20 x 25 cm M2 22.56 277,349.17 6,256,997.30 6.44 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

V. PEKERJAAN LANTAI

1 Pek. Urugan Tanah Bawah Lantai M3 6.51 120,065.00 781,623.15 0.80 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Urugan Pasir M3 1.05 230,010.00 241,510.50 0.25 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cor Lantai Kerja Beton K-100 M3 1.05 1,000,467.29 1,050,490.65 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Lantai Keramik 25 x 25 cm M2 15.40 170,624.85 2,627,622.69 2.70 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Acian Selasar M3 5.60 44,506.00 249,233.60 0.26 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VI. PEKERJAAN PLAFOND

1 Pek. Plafond Triplek 4 mm M2 27.40 64,881.58 1,777,755.16 1.83 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Rangka Plafond Kayu Kelas II M2 27.40 124,331.35 3,406,678.99 3.51 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. List Profil Kayu M3 59.22 16,706.53 989,360.41 1.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VII. PEKERJAAN KUSEN PINTU, JENDELA

1 Pek. KusenJendela Kayu Kelas II M3 0.15 7,007,660.00 1,051,149.00 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pintu Fiber KM/WC Lengkap Aksesoris Unit 4.00 762,500.00 3,050,000.00 3.14 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Daun Pintu Panel Kayu Kelas II M2 3.04 696,685.00 2,117,922.40 2.18 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Kaca Ventilasi 5 mm M2 3.28 152,817.50 501,241.40 0.52 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

5 Pek. Pas. Kunci Tanam Bh 2.00 143,165.00 286,330.00 0.29 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. Pas. Ensel Pintu Bh 6.00 15,427.50 92,565.00 0.10 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Pas. Grendel Pintu Bh 2.00 15,427.50 30,855.00 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding dengan Cat Air M2 112.77 24,311.10 2,741,562.75 2.82 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pengecatan Plafond dengan Cat Air M2 27.40 24,311.10 666,124.14 0.69 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cat Minyak Kayu Kusen, Pintu dan Jendela M2 12.36 51,629.33 638,138.46 0.66 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Cat Minyak List Profil Kayu M2 1.78 51,629.33 91,900.20 0.09 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Cat Minyak List Plank M2 8.04 51,629.33 415,099.77 0.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

IX. PEKERJAAN ATAP

1 Pek. Kayu Kuda-kuda Kelas II M3 0.41 5,892,194.00 2,415,799.54 2.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Gording Kayu Kelas II M3 0.26 4,908,970.00 1,276,332.20 1.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Atap Longspan/Spandek 0,3 mm M2 45.04 106,554.80 4,799,228.19 4.94 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Perabung Atap Longspan M1 7.75 45,766.60 354,691.15 0.36 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Bola-bola Atap M1 12.00 45,766.60 549,199.20 0.57 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. List Plank Papan + Anak M1 26.80 76,665.60 2,054,638.08 2.11 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Atap Canopy (Longspan + Rangka besi Holl M2 0.96 532,400.00 511,104.00 0.53 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

X. PEKERJAAN ELEKTRIKAL

1 Pek. Instalasi Titik Lampu Bh 8.00 180,000.00 1,440,000.00 1.48 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Instalasi Titik Stop Kontak Bh 1.00 180,000.00 180,000.00 0.19 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Saklar Tunggal Bh 4.00 15,200.00 60,800.00 0.06 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. Stop Kontak Bh 1.00 20,200.00 20,200.00 0.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Lampu Save Energy 24 Watt Bh 8.00 60,200.00 481,600.00 0.50 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. MCB Bh 1.00 66,200.00 66,200.00 0.07 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XI. PEKERJAAN SANITASI

1 Pek. Air Bersih

- Pek. Sumur Bor Unit 1.00 1,800,000.00 1,800,000.00 1.85 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Mesin Air Semi Jet Pump Unit 1.00 750,000.00 750,000.00 0.77 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pemasangan Pipa PVC 3 /4" M1 18.00 16,572.60 298,306.80 0.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Kran Air Ø 3/4" Unit 8.00 24,337.50 194,700.00 0.20 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Tangki Plastik 1000 Liter Lengkap Aksesoris Unit 1.00 1,828,500.00 1,828,500.00 1.88 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Air Kotor

- Pek. Pas. Closet Jongkok Unit 4.00 545,274.33 2,181,097.33 2.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Floor Drain Plastik Unit 6.00 24,337.50 146,025.00 0.15 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Kotoran Ringan) M1 18.00 50,242.50 904,365.00 0.93 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 4 " (Kotoran Padat) M1 12.00 116,160.00 1,393,920.00 1.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Pembuangan air Hujan) M1 3.00 50,242.50 150,727.50 0.16 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Septiktank

- Galian Tanah M3 5.25 86,625.00 454,781.25 0.47 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Urugan Pasir 5 cm M3 0.12 230,010.00 27,601.20 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Lantai Kerja Beton Mutu K 100 (10 cm) M3 0.23 1,000,467.29 230,107.48 0.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas 1/2 Bata Camp. 1 : 2 M2 11.55 141,581.00 1,635,260.55 1.68 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Plesteran Dinding Camp. 1 : 2 M2 11.55 79,899.95 922,844.45 0.95 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Plat Tutup Septic Tank Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-100) T. 13 cm M3 0.39 1,000,467.29 390,182.24 0.40 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Besi Beton Polos Kg 24.37 23,091.20 562,732.54 0.58 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Bekisting Multiplek M2 1.17 376,648.25 440,678.45 0.45 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XII. PEKERJAAN LAIN-LAIN

1 Pek. Pembersihan Akhir Unit 1.00 290,000.00 290,000.00 0.30 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

JUMLAH 97,178,893.37 100.00 Err:509 - Err:509

PPN 11% 10,689,678.27 RENCANA SAMPAI MINGGU INI 10.74

TOTAL BIAYA 107,868,571.64 REALISASI SAMPAI MINGGU INI Err:509

DIBULATKAN 107,868,000.00 DEVIASI PEKERJAAN Err:509

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI ISYKARIMAN EMIL MUPLI


NIP. 19670817 199103 1 010 Direktur Direktur
KURVA S TIME SCHEDULE / RENCANA PELAKSANAAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR


PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG
LOKASI : KECAMATAN TAMBANG
T.A : 2022

Bobot NOVEMBER DESEMBER


No Uraian Pekerjaan Volume Sat Total Harga (Rp) KET
(%) 22-28 29-05 06-12 13-19 20-26 27-31

100.00
A PEKERJAAN PERSIAPAN 1.00
1 Pek. Pembersihan dan Perataan Lokasi 1.00 Ls 500,000.00 0.28 0.28 89.59
2 Papan Nama Proyek 1.00 Ls 200,000.00 0.11 0.11
3 Pek. Pengadaan Perlengkapan K-3 1.00 LS 900,000.00 0.50 0.50
- 69.88
B PEKERJAAN PAVING BLOCK
1 Pek. Pas. Paving Block segi enam Tebal 6 cm 952.77 M2 179,105,992.07 98.57 9.86 19.71 19.71 19.71 19.71 9.86
50.17
C PEKERJAAN KANSTIN BETON BERTULANG
1 Pek. Galian 0.14 M3 12,127.50 0.01 0.01
2 Pek. Bekisting Papan 0.90 M2 109,014.05 0.06 0.06
30.45
3 Pek. Besi Beton Polos 22.71 Kg 457,252.22 0.25 0.25
4 Pek Beton Campuran 1 : 2 : 3 0.14 M3 120,447.25 0.07 0.07
-
10.74
D PEKERJAAN AKHIR -
1 Pek. Pembersihan Akhir 1.00 Ls 300,000.00 0.17 0 0.17
0%
JUMLAH TOTAL 181,704,833.09 100.00
PROGRES RENCANA (%) 10.74 19.71 19.71 19.71 19.71 10.41
KUMULATIF RENCANA (%) 0 10.74 30.45 50.17 69.88 89.59 100.00

Dibuat oleh :
Kontraktor Pelaksana
CV. ELSA MUTIARA ABADI
Bobot NOVEMBER DESEMBER
No Uraian Pekerjaan Volume Sat Total Harga (Rp) KET
(%) 22-28 29-05 06-12 13-19 20-26 27-31
EMIL MUPLI
100.00
Direktur
89.59

69.88

50.17

30.45

10.74

0
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : XII (Dua Belas)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 27 Juli s/d 02 Agustus 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00 0.31 - - - - - - - -

2 Pasang Bouwplank/Pengukuran Ls 1.00 300,000.00 300,000.00 0.31 1.00 100.00 0.31 - - 1.00 100.00 0.31

3 Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

4 Pek. Pengadaan Perlengkapan K-3 Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

II. PEKERJAAN PONDASI

1 Galian Tanah M3 2.77 86,625.00 239,951.25 0.25 - - - - - - - -

2 Urugan Tanah kembali bekas galian M3 0.83 63,250.00 52,497.50 0.05 1.50 180.72 0.10 - - 1.50 180.72 0.10

3 Urugan Pasir 5 cm M3 0.34 230,010.00 78,203.40 0.08 0.15 44.12 0.04 - - 0.15 44.12 0.04

4 Pek. Pond. Lajur Pas. 1 Bata Adukan 1 : 4 M2 12.29 264,954.80 3,256,294.49 3.35 3.36 27.34 0.92 - - 3.36 27.34 0.92

5 Pek. Berapen Rollag Bata M2 24.57 42,852.83 1,052,894.08 1.08 6.72 27.35 0.30 - - 6.72 27.35 0.30

III. PEKERJAAN STRUKTUR

1 Pek. Pondasi Tapak Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.29 820,418.41 237,921.34 0.24 - - - - - - - -

- Besi Beton Polos Kg 23.10 19,287.00 445,529.70 0.46 67.50 292.21 1.34 - - 67.50 292.21 1.34

2 Pek. Sloof Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.82 1,138,575.25 933,631.71 0.96 100.80 ### 118.10 - - 100.80 ### 118.10

- Besi Beton Polos Kg 87.58 23,091.20 2,022,327.30 2.08 8.96 10.23 0.21 - - 8.96 10.23 0.21

- Bekisting Multiplek M2 5.46 211,508.00 1,154,833.68 1.19 0.67 12.27 0.15 - - 0.67 12.27 0.15

3 Pek. Kolom Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.42 1,138,575.25 478,201.61 0.49 10.50 ### 12.30 - - 10.50 ### 12.30

- Besi Beton Polos Kg 42.84 23,091.20 989,227.01 1.02 0.95 2.22 0.02 - - 0.95 2.22 0.02

- Bekisting Multiplek 2 x Pakai M2 4.90 345,848.25 1,694,656.43 1.74 - - - - - - - -

4 Pek. Ring Balok Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.18 1,138,575.25 204,943.55 0.21 - - - - - - - -

- Besi Beton Polos Kg 19.25 23,091.20 444,505.60 0.46 18.00 93.51 0.43 - - 18.00 93.51 0.43

- Bekisting Multiplek M2 1.65 354,741.75 585,323.89 0.60 62.16 ### 22.69 - - 62.16 ### 22.69

5 Pek. Plat Beton Bertulang T. 12 cm

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.22 1,138,575.25 250,486.56 0.26 126.64 ### 148.37 - - 126.64 ### 148.37

- Besi Beton Polos Kg 18.51 23,091.20 427,418.11 0.44 - - - - - - - -

- Bekisting Multiplek M2 1.82 376,648.25 685,499.82 0.71 - - - - - - - -

6 Pek. Kolom Praktis Beton Bertulang KP 11 x 11 M1 23.85 114,362.60 2,727,548.01 2.81 64.32 269.69 7.57 - - 64.32 269.69 7.57

7 Pek. Ring Balok Beton Bertulang 10 x 15 cm M1 21.30 144,826.00 3,084,793.80 3.17 348.60 ### 51.95 - - 348.60 ### 51.95

IV. PEKERJAAN DINDING

1 Pek. Dinding Pas. 1/2 Bata Camp. 1 : 4 M2 67.66 128,627.40 8,702,929.88 8.96 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Plester Dinding T. 1,5 cm Camp. 1 : 4 M2 112.77 73,188.72 8,253,491.95 8.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Dinding Keramik 20 x 25 cm M2 22.56 277,349.17 6,256,997.30 6.44 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

V. PEKERJAAN LANTAI

1 Pek. Urugan Tanah Bawah Lantai M3 6.51 120,065.00 781,623.15 0.80 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Urugan Pasir M3 1.05 230,010.00 241,510.50 0.25 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cor Lantai Kerja Beton K-100 M3 1.05 1,000,467.29 1,050,490.65 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Lantai Keramik 25 x 25 cm M2 15.40 170,624.85 2,627,622.69 2.70 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Acian Selasar M3 5.60 44,506.00 249,233.60 0.26 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VI. PEKERJAAN PLAFOND

1 Pek. Plafond Triplek 4 mm M2 27.40 64,881.58 1,777,755.16 1.83 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Rangka Plafond Kayu Kelas II M2 27.40 124,331.35 3,406,678.99 3.51 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. List Profil Kayu M3 59.22 16,706.53 989,360.41 1.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VII. PEKERJAAN KUSEN PINTU, JENDELA

1 Pek. KusenJendela Kayu Kelas II M3 0.15 7,007,660.00 1,051,149.00 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pintu Fiber KM/WC Lengkap Aksesoris Unit 4.00 762,500.00 3,050,000.00 3.14 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Daun Pintu Panel Kayu Kelas II M2 3.04 696,685.00 2,117,922.40 2.18 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Kaca Ventilasi 5 mm M2 3.28 152,817.50 501,241.40 0.52 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

5 Pek. Pas. Kunci Tanam Bh 2.00 143,165.00 286,330.00 0.29 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. Pas. Ensel Pintu Bh 6.00 15,427.50 92,565.00 0.10 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Pas. Grendel Pintu Bh 2.00 15,427.50 30,855.00 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding dengan Cat Air M2 112.77 24,311.10 2,741,562.75 2.82 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pengecatan Plafond dengan Cat Air M2 27.40 24,311.10 666,124.14 0.69 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cat Minyak Kayu Kusen, Pintu dan Jendela M2 12.36 51,629.33 638,138.46 0.66 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Cat Minyak List Profil Kayu M2 1.78 51,629.33 91,900.20 0.09 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Cat Minyak List Plank M2 8.04 51,629.33 415,099.77 0.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

IX. PEKERJAAN ATAP

1 Pek. Kayu Kuda-kuda Kelas II M3 0.41 5,892,194.00 2,415,799.54 2.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Gording Kayu Kelas II M3 0.26 4,908,970.00 1,276,332.20 1.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Atap Longspan/Spandek 0,3 mm M2 45.04 106,554.80 4,799,228.19 4.94 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Perabung Atap Longspan M1 7.75 45,766.60 354,691.15 0.36 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Bola-bola Atap M1 12.00 45,766.60 549,199.20 0.57 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. List Plank Papan + Anak M1 26.80 76,665.60 2,054,638.08 2.11 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Atap Canopy (Longspan + Rangka besi Holl M2 0.96 532,400.00 511,104.00 0.53 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

X. PEKERJAAN ELEKTRIKAL

1 Pek. Instalasi Titik Lampu Bh 8.00 180,000.00 1,440,000.00 1.48 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Instalasi Titik Stop Kontak Bh 1.00 180,000.00 180,000.00 0.19 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Saklar Tunggal Bh 4.00 15,200.00 60,800.00 0.06 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. Stop Kontak Bh 1.00 20,200.00 20,200.00 0.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Lampu Save Energy 24 Watt Bh 8.00 60,200.00 481,600.00 0.50 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. MCB Bh 1.00 66,200.00 66,200.00 0.07 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XI. PEKERJAAN SANITASI

1 Pek. Air Bersih

- Pek. Sumur Bor Unit 1.00 1,800,000.00 1,800,000.00 1.85 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Mesin Air Semi Jet Pump Unit 1.00 750,000.00 750,000.00 0.77 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pemasangan Pipa PVC 3 /4" M1 18.00 16,572.60 298,306.80 0.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Kran Air Ø 3/4" Unit 8.00 24,337.50 194,700.00 0.20 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Tangki Plastik 1000 Liter Lengkap Aksesoris Unit 1.00 1,828,500.00 1,828,500.00 1.88 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Air Kotor

- Pek. Pas. Closet Jongkok Unit 4.00 545,274.33 2,181,097.33 2.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Floor Drain Plastik Unit 6.00 24,337.50 146,025.00 0.15 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Kotoran Ringan) M1 18.00 50,242.50 904,365.00 0.93 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 4 " (Kotoran Padat) M1 12.00 116,160.00 1,393,920.00 1.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Pembuangan air Hujan) M1 3.00 50,242.50 150,727.50 0.16 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Septiktank

- Galian Tanah M3 5.25 86,625.00 454,781.25 0.47 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Urugan Pasir 5 cm M3 0.12 230,010.00 27,601.20 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Lantai Kerja Beton Mutu K 100 (10 cm) M3 0.23 1,000,467.29 230,107.48 0.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas 1/2 Bata Camp. 1 : 2 M2 11.55 141,581.00 1,635,260.55 1.68 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Plesteran Dinding Camp. 1 : 2 M2 11.55 79,899.95 922,844.45 0.95 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Plat Tutup Septic Tank Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-100) T. 13 cm M3 0.39 1,000,467.29 390,182.24 0.40 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Besi Beton Polos Kg 24.37 23,091.20 562,732.54 0.58 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Bekisting Multiplek M2 1.17 376,648.25 440,678.45 0.45 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XII. PEKERJAAN LAIN-LAIN

1 Pek. Pembersihan Akhir Unit 1.00 290,000.00 290,000.00 0.30 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

JUMLAH 97,178,893.37 100.00 Err:509 - Err:509

PPN 11% 10,689,678.27 RENCANA SAMPAI MINGGU INI 10.74

TOTAL BIAYA 107,868,571.64 REALISASI SAMPAI MINGGU INI Err:509

DIBULATKAN 107,868,000.00 DEVIASI PEKERJAAN Err:509

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI ISYKARIMAN EMIL MUPLI


NIP. 19670817 199103 1 010 Direktur Direktur
LAPORAN MINGGUAN

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR MINGGU KE : XIII (Tiga Belas)


SUB KEGIATAN : PEMBANGUNAN SARANA, PRASARANA DAN UTILITAS SEKOLAH TANGGAL : 03 Agustus s/d 08 Agustus 2022
PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG NOMOR KONTRAK : 053/SPK/PPK.AM/DIKPORA-SPUS.SD/2022
LOKASI : KECAMATAN TAMBANG TANGGAL KONTRAK : 11 Juli 2022
T.A : 2022 KONTRAKTOR PELAKSANA : CV. ELSA MUTIARA ABADI
KONSULTAN PENGAWAS : PT. SUAI MANDIRI CONSULTANT

Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

I. PEKERJAAN PERSIAPAN

1 Pembersihan Lokasi Ls 1.00 300,000.00 300,000.00 0.31 - - - - - - - -

2 Pasang Bouwplank/Pengukuran Ls 1.00 300,000.00 300,000.00 0.31 1.00 100.00 0.31 - - 1.00 100.00 0.31

3 Papan Nama Proyek Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

4 Pek. Pengadaan Perlengkapan K-3 Ls 1.00 350,000.00 350,000.00 0.36 1.00 100.00 0.36 - - 1.00 100.00 0.36

II. PEKERJAAN PONDASI

1 Galian Tanah M3 2.77 86,625.00 239,951.25 0.25 - - - - - - - -

2 Urugan Tanah kembali bekas galian M3 0.83 63,250.00 52,497.50 0.05 1.50 180.72 0.10 - - 1.50 180.72 0.10

3 Urugan Pasir 5 cm M3 0.34 230,010.00 78,203.40 0.08 0.15 44.12 0.04 - - 0.15 44.12 0.04

4 Pek. Pond. Lajur Pas. 1 Bata Adukan 1 : 4 M2 12.29 264,954.80 3,256,294.49 3.35 3.36 27.34 0.92 - - 3.36 27.34 0.92

5 Pek. Berapen Rollag Bata M2 24.57 42,852.83 1,052,894.08 1.08 6.72 27.35 0.30 - - 6.72 27.35 0.30

III. PEKERJAAN STRUKTUR

1 Pek. Pondasi Tapak Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.29 820,418.41 237,921.34 0.24 - - - - - - - -

- Besi Beton Polos Kg 23.10 19,287.00 445,529.70 0.46 67.50 292.21 1.34 - - 67.50 292.21 1.34

2 Pek. Sloof Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.82 1,138,575.25 933,631.71 0.96 100.80 ### 118.10 - - 100.80 ### 118.10

- Besi Beton Polos Kg 87.58 23,091.20 2,022,327.30 2.08 8.96 10.23 0.21 - - 8.96 10.23 0.21

- Bekisting Multiplek M2 5.46 211,508.00 1,154,833.68 1.19 0.67 12.27 0.15 - - 0.67 12.27 0.15

3 Pek. Kolom Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.42 1,138,575.25 478,201.61 0.49 10.50 ### 12.30 - - 10.50 ### 12.30

- Besi Beton Polos Kg 42.84 23,091.20 989,227.01 1.02 0.95 2.22 0.02 - - 0.95 2.22 0.02

- Bekisting Multiplek 2 x Pakai M2 4.90 345,848.25 1,694,656.43 1.74 - - - - - - - -

4 Pek. Ring Balok Beton Bertulang 15/20

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.18 1,138,575.25 204,943.55 0.21 - - - - - - - -

- Besi Beton Polos Kg 19.25 23,091.20 444,505.60 0.46 18.00 93.51 0.43 - - 18.00 93.51 0.43

- Bekisting Multiplek M2 1.65 354,741.75 585,323.89 0.60 62.16 ### 22.69 - - 62.16 ### 22.69

5 Pek. Plat Beton Bertulang T. 12 cm

- Beton Mutu F'c = 14,5 pa (K-175) M3 0.22 1,138,575.25 250,486.56 0.26 126.64 ### 148.37 - - 126.64 ### 148.37

- Besi Beton Polos Kg 18.51 23,091.20 427,418.11 0.44 - - - - - - - -

- Bekisting Multiplek M2 1.82 376,648.25 685,499.82 0.71 - - - - - - - -

6 Pek. Kolom Praktis Beton Bertulang KP 11 x 11 M1 23.85 114,362.60 2,727,548.01 2.81 64.32 269.69 7.57 - - 64.32 269.69 7.57

7 Pek. Ring Balok Beton Bertulang 10 x 15 cm M1 21.30 144,826.00 3,084,793.80 3.17 348.60 ### 51.95 - - 348.60 ### 51.95

IV. PEKERJAAN DINDING

1 Pek. Dinding Pas. 1/2 Bata Camp. 1 : 4 M2 67.66 128,627.40 8,702,929.88 8.96 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Plester Dinding T. 1,5 cm Camp. 1 : 4 M2 112.77 73,188.72 8,253,491.95 8.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Dinding Keramik 20 x 25 cm M2 22.56 277,349.17 6,256,997.30 6.44 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

V. PEKERJAAN LANTAI

1 Pek. Urugan Tanah Bawah Lantai M3 6.51 120,065.00 781,623.15 0.80 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Urugan Pasir M3 1.05 230,010.00 241,510.50 0.25 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cor Lantai Kerja Beton K-100 M3 1.05 1,000,467.29 1,050,490.65 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Lantai Keramik 25 x 25 cm M2 15.40 170,624.85 2,627,622.69 2.70 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Acian Selasar M3 5.60 44,506.00 249,233.60 0.26 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VI. PEKERJAAN PLAFOND

1 Pek. Plafond Triplek 4 mm M2 27.40 64,881.58 1,777,755.16 1.83 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Rangka Plafond Kayu Kelas II M2 27.40 124,331.35 3,406,678.99 3.51 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. List Profil Kayu M3 59.22 16,706.53 989,360.41 1.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VII. PEKERJAAN KUSEN PINTU, JENDELA

1 Pek. KusenJendela Kayu Kelas II M3 0.15 7,007,660.00 1,051,149.00 1.08 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pintu Fiber KM/WC Lengkap Aksesoris Unit 4.00 762,500.00 3,050,000.00 3.14 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Daun Pintu Panel Kayu Kelas II M2 3.04 696,685.00 2,117,922.40 2.18 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Kaca Ventilasi 5 mm M2 3.28 152,817.50 501,241.40 0.52 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

5 Pek. Pas. Kunci Tanam Bh 2.00 143,165.00 286,330.00 0.29 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. Pas. Ensel Pintu Bh 6.00 15,427.50 92,565.00 0.10 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Pas. Grendel Pintu Bh 2.00 15,427.50 30,855.00 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

VIII. PEKERJAAN PENGECATAN

1 Pek. Pengecatan dinding dengan Cat Air M2 112.77 24,311.10 2,741,562.75 2.82 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Pengecatan Plafond dengan Cat Air M2 27.40 24,311.10 666,124.14 0.69 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Cat Minyak Kayu Kusen, Pintu dan Jendela M2 12.36 51,629.33 638,138.46 0.66 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Cat Minyak List Profil Kayu M2 1.78 51,629.33 91,900.20 0.09 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Cat Minyak List Plank M2 8.04 51,629.33 415,099.77 0.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

IX. PEKERJAAN ATAP

1 Pek. Kayu Kuda-kuda Kelas II M3 0.41 5,892,194.00 2,415,799.54 2.49 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Gording Kayu Kelas II M3 0.26 4,908,970.00 1,276,332.20 1.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Atap Longspan/Spandek 0,3 mm M2 45.04 106,554.80 4,799,228.19 4.94 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

4 Pek. Perabung Atap Longspan M1 7.75 45,766.60 354,691.15 0.36 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

5 Pek. Bola-bola Atap M1 12.00 45,766.60 549,199.20 0.57 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

6 Pek. List Plank Papan + Anak M1 26.80 76,665.60 2,054,638.08 2.11 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

7 Pek. Atap Canopy (Longspan + Rangka besi Holl M2 0.96 532,400.00 511,104.00 0.53 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

X. PEKERJAAN ELEKTRIKAL

1 Pek. Instalasi Titik Lampu Bh 8.00 180,000.00 1,440,000.00 1.48 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Instalasi Titik Stop Kontak Bh 1.00 180,000.00 180,000.00 0.19 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Pas. Saklar Tunggal Bh 4.00 15,200.00 60,800.00 0.06 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. Stop Kontak Bh 1.00 20,200.00 20,200.00 0.02 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Lampu Save Energy 24 Watt Bh 8.00 60,200.00 481,600.00 0.50 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

Pek. Pas. MCB Bh 1.00 66,200.00 66,200.00 0.07 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XI. PEKERJAAN SANITASI

1 Pek. Air Bersih

- Pek. Sumur Bor Unit 1.00 1,800,000.00 1,800,000.00 1.85 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Mesin Air Semi Jet Pump Unit 1.00 750,000.00 750,000.00 0.77 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pemasangan Pipa PVC 3 /4" M1 18.00 16,572.60 298,306.80 0.31 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Kran Air Ø 3/4" Unit 8.00 24,337.50 194,700.00 0.20 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Tangki Plastik 1000 Liter Lengkap Aksesoris Unit 1.00 1,828,500.00 1,828,500.00 1.88 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

2 Pek. Air Kotor

- Pek. Pas. Closet Jongkok Unit 4.00 545,274.33 2,181,097.33 2.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas. Floor Drain Plastik Unit 6.00 24,337.50 146,025.00 0.15 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Kotoran Ringan) M1 18.00 50,242.50 904,365.00 0.93 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 4 " (Kotoran Padat) M1 12.00 116,160.00 1,393,920.00 1.43 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas Pipa PVC 2.5 " (Pembuangan air Hujan) M1 3.00 50,242.50 150,727.50 0.16 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

3 Pek. Septiktank

- Galian Tanah M3 5.25 86,625.00 454,781.25 0.47 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Urugan Pasir 5 cm M3 0.12 230,010.00 27,601.20 0.03 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Lantai Kerja Beton Mutu K 100 (10 cm) M3 0.23 1,000,467.29 230,107.48 0.24 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Pas 1/2 Bata Camp. 1 : 2 M2 11.55 141,581.00 1,635,260.55 1.68 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Pek. Plesteran Dinding Camp. 1 : 2 M2 11.55 79,899.95 922,844.45 0.95 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Plat Tutup Septic Tank Beton Bertulang

- Beton Mutu F'c = 14,5 pa (K-100) T. 13 cm M3 0.39 1,000,467.29 390,182.24 0.40 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Besi Beton Polos Kg 24.37 23,091.20 562,732.54 0.58 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

- Bekisting Multiplek M2 1.17 376,648.25 440,678.45 0.45 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

XII. PEKERJAAN LAIN-LAIN

1 Pek. Pembersihan Akhir Unit 1.00 290,000.00 290,000.00 0.30 Err:509 Err:509 Err:509 - - Err:509 Err:509 Err:509

JUMLAH 97,178,893.37 100.00 Err:509 - Err:509

PPN 11% 10,689,678.27 RENCANA SAMPAI MINGGU INI 10.74

TOTAL BIAYA 107,868,571.64 REALISASI SAMPAI MINGGU INI Err:509

DIBULATKAN 107,868,000.00 DEVIASI PEKERJAAN Err:509

Disetujui Oleh : Diperiksa oleh : Dibuat oleh :


PEJABAT PEMBUAT KOMITMEN (PPK) Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI
Realisasi
Jumlah Harga S/D Minggu Lalu Minggu Ini S/D Minggu Ini
Harga Satuan
NO Uraian Pekerjaan Satuan Volume (Rp) Bobot (%)
(Rp) Bobot Bobot Bobot
Volume Bobot (%) Volume Bobot (%) Volume Bobot (%)
(%)/Item (%)/Item (%)/Item

AGUSMARDI ISYKARIMAN EMIL MUPLI


NIP. 19670817 199103 1 010 Direktur Direktur
HARI 1
LAPORAN HARIAN
TANGGAL 11 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Bata Merah 12,500 Bh
2 Tukang 1 2 Pasir Pasang 21.00 M3
3 Kepala Tukang 1 3 Pasir Cor 7.00 M3

IL
4 Mandor 1 4 Keikil 10.00 M3
5
I H
6
7
N
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

Cangkul Unit

Angkong Bh

Skop Bh

Gergaji Bh

I L Instruksi dan Saran Pengawas Tanggapan dan Jawaban


H
NI

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 2
LAPORAN HARIAN
TANGGAL 12 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Kayu Kelas III 3.20 M3
2 Tukang 1 2 Kayu Kelas II 0.50 M3
3 Kepala Tukang 1 3 Kayu Perancah 70.00 Btg
4 Mandor 1 4 Paku 30.00 Kg
5 Triplek 9 mm
I L 15.00 Lmbr

H
NI
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembersihan Lokasi Cangkul 2 Unit

2 Pek. Pas Papan Nama Kegiatan Angkong 2 Bh

3 Pek. Pengadaan K3 Skop 3 Bh

4 Pek. Pas Bouwplank Gergaji 2 Bh

I L Instruksi dan Saran Pengawas Tanggapan dan Jawaban


H
NI

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 3
LAPORAN HARIAN
TANGGAL 13 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Bata Merah 3,000 Bh
2 Tukang 1 2 Pasir Pasang 6 M3
3 Kepala Tukang 1 3 Pasir Cor 3 M3
4 Mandor 1 4 Kerikil 5 M3
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

Cangkul Unit

Angkong Bh

Skop Bh

Gergaji Bh

H IL Instruksi dan Saran Pengawas Tanggapan dan Jawaban

N I

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
- -

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 4
LAPORAN HARIAN
TANGGAL 14 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Papan 2/20 0.20 M3
2 Tukang 1 2 Kayu 5/7 0.10 M3
3 Kepala Tukang 1 3 Cerocok Kayu 50 Btg
4 Mandor 1 4 Paku 10 Kg
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembersihan Lokasi Cangkul 2 Unit

2 Pek. Pas Papan Nama Kegiatan Angkong 2 Bh

3 Pek. Pengadaan K3 Kontruksi Skop 3 Bh

4 Pek. Pas. Bouwplank Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 5
LAPORAN HARIAN
TANGGAL 15 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Semen 30 Zak
2 Tukang 1 2 Besi 10 mm Net 40 Btg
3 Kepala Tukang 1 3 Besi 6 mm Net 25 Btg
4 Mandor 1 4 Kawat Ikat 5 Kg
5
6
7
8

Jumlah
iatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Galian Tanah Pondasi Cangkul 2 Unit

2 Pek. Pas. Kayu Cerocok Dia 10 cm Angkong 2 Bh

3 Pek. Pas Gorong-gorong Dia. 60 cm Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 6
LAPORAN HARIAN
TANGGAL 16 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Urugan Pasir Di Bawah Pondasi Cangkul 2 Unit

2 Pek. Cor Lantai Kerja Beton Mutu F'c = 7,4 Mpa (K-100) Angkong 2 Bh

3 Pek. Pembesian Pondasi Setempat Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 7
LAPORAN HARIAN
TANGGAL 17 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Bekisting Pondasi Setempat 2 x Pakai Cangkul 2 Unit

2 Pek. Cor Pondasi Setempat Beton Mutu F'c = 14,5 pa (K-175) Angkong 2 Bh

Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 8
LAPORAN HARIAN
TANGGAL 18 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pas Pondasi Pas. 1 Bata Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 9
LAPORAN HARIAN
TANGGAL 19 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pas Pondasi Pas. 1 Bata Cangkul 2 Unit

2 Pek. Rapen Pondasi Angkong 2 Bh

3 Pek. Urugan Tanah Bekas Galian Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 10
LAPORAN HARIAN
TANGGAL 20 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
I L
5
H
6
7
NI
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pas Pondasi Pas. 1 Bata Cangkul 2 Unit

2 Pek. Rapen Pondasi Angkong 2 Bh

IL
Skop 3 Bh

I H Gergaji 2 Bh

N Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 11
LAPORAN HARIAN
TANGGAL 21 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Rapen Pondasi Cangkul 2 Unit

2 Pek. Urugan Tanah Bekas Galian Angkong 2 Bh

Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 12
LAPORAN HARIAN
TANGGAL 22 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Balok Sloof Cangkul 2 Unit

2 Pek. Bekisting Balok Sloof 2 x Pakai Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 13
LAPORAN HARIAN
TANGGAL 23 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Balok Sloof Cangkul 2 Unit

2 Pek. Bekisting Balok Sloof 2 x Pakai Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 14
LAPORAN HARIAN
TANGGAL 24 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Cor Balok Sloof Beton Mutu F'c = 14,5 pa (K-175) Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 15
LAPORAN HARIAN
TANGGAL 25 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Kolom Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 16
LAPORAN HARIAN
TANGGAL 26 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Kolom Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 17
LAPORAN HARIAN
TANGGAL 27 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 3 1
2 Tukang 2 2
3 Kepala Tukang 1 3
4 Mandor 1 4
I L
H
NI
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Kolom Cangkul 2 Unit

2 Pek. Bekisting Kolom 2 x Pakai Angkong 2 Bh

3 Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) Skop 3 Bh

I L Gergaji 2 Bh
H
NI
Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 18
LAPORAN HARIAN
TANGGAL 28 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Kolom Cangkul 2 Unit

2 Pek. Bekisting Kolom 2 x Pakai Angkong 2 Bh

3 Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 19
LAPORAN HARIAN
TANGGAL 29 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Semen 50.00 Zak
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Kolom Cangkul 2 Unit

2 Pek. Bekisting Kolom 2 x Pakai Angkong 2 Bh

3 Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) Skop 3 Bh

Gergaji 2 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 20
LAPORAN HARIAN
TANGGAL 30 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Semen 30.00 Zak
2 Tukang 1 2 Pasir Pasang 4.00 M3
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Kolom Cangkul 2 Unit

2 Pek. Bekisting Kolom 2 x Pakai Angkong 2 Bh

3 Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 21
LAPORAN HARIAN
TANGGAL 31 Juli 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembesian Kolom Cangkul 2 Unit

2 Pek. Bekisting Kolom 2 x Pakai Angkong 2 Bh

3 Pek. Cor Kolom Beton Mutu F'c = 14,5 pa (K-175) Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 22
LAPORAN HARIAN
TANGGAL 01 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pas Dinding 1/2 Bata, 1 : 4 Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 23
LAPORAN HARIAN
TANGGAL 02 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pas Dinding 1/2 Bata, 1 : 4 Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 24
LAPORAN HARIAN
TANGGAL 03 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 3 1
2 Tukang 2 2
3 Kepala Tukang 1 3
4 Mandor 1 4
I L
5
H
6
7
NI
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pas Dinding 1/2 Bata, 1 : 4 Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

I L
H
NI
Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 25
LAPORAN HARIAN
TANGGAL 04 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Ring Balok Beton Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 26
LAPORAN HARIAN
TANGGAL 05 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Ring Balok Beton Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 27
LAPORAN HARIAN
TANGGAL 06 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Semen 15 Zak
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Plesteran Dinding 1 : 4 Tebal 20 mm Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 28
LAPORAN HARIAN
TANGGAL 07 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Plesteran Dinding 1 : 4 Tebal 20 mm Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 29
LAPORAN HARIAN
TANGGAL 08 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Plesteran Dinding 1 : 4 Tebal 20 mm Cangkul 2 Unit

2 Pek. Adverking Beton 1 : 3 Tebal 20 mm Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 30
LAPORAN HARIAN
TANGGAL 09 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1 Cat Air Dasar 10 Kg
2 Tukang 1 2 Plamir 10 Kg
3 Kepala Tukang 1 3 Cat Air Penutup 25 Kg
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Adverking Beton 1 : 3 Tebal 20 mm Cangkul 2 Unit

2 Pek. Cat Kolom + Sloof dengan Cat Air Angkong 2 Bh

3 Pek. Cat Dinding dengan Cat Air Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 31
LAPORAN HARIAN
TANGGAL 10 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 3 1 Cat Air Dasar 30.00 Kg
2 Tukang 2 2 Cat Air Penutup 100.00 Kg
3 Kepala Tukang 1 3 Plamuur 30.00 Kg
4 Mandor 1 4 Kuas
I L 5.00 Bh

H
NI
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Plesteran Dinding 1 : 4 Tebal 20 mm Cangkul 2 Unit

2 Pek. Adverking Beton 1 : 3 Tebal 20 mm Angkong 2 Bh

3 I L
Pek. Cat Kolom+ Sloof Dengan Cat Air Skop 3 Bh
H
NI
4 Pek. Cat Dinding Dengan Cat Air

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 32
LAPORAN HARIAN
TANGGAL 11 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Cat Kolom + Sloof dengan Cat Air Cangkul 2 Unit

2 Pek. Cat Dinding dengan Cat Air Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
HARI 33
LAPORAN HARIAN
TANGGAL 12 Agustus 2022

KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR

PEKERJAAN : PEMB. PAGAR SDN 007 RIMBO PANJANG KEC. TAMBANG

LOKASI : KECAMATAN TAMBANG

KONTRAKTOR : CV. ELSA MUTIARA ABADI

TAHUN ANGGARAN : 2022

Jumlah Bahan Yang Datang


No. Uraian Tenaga
No. Nama Bahan Jumlah Satuan
( Orang )
1 Pekerja 2 1
2 Tukang 1 2
3 Kepala Tukang 1 3
4 Mandor 1 4
5
6
7
8

Jumlah
Kegiatan Yang Dilaksanakan Hari Ini Peralatan Yang Digunakan Jumlah Satuan

1 Pek. Pembersihan Akhir Cangkul 2 Unit

Angkong 2 Bh

Skop 3 Bh

Instruksi dan Saran Pengawas Tanggapan dan Jawaban

Keadaan Cuaca Jam Kerja Jumlah Jam Kerja


Cerah Mulai Kerja : 08:00 WIB
Hujan Istirahat : 12:00 - 13:00 WIB 8 Jam
Gerimis Selesai : 17:00 WIB

Diperiksa Dibuat oleh :


Konsultan Pengawas Kontraktor Pelaksana
PT. SUAI MANDIRI CONSULTANT CV. ELSA MUTIARA ABADI

RUPA'I GILANG RAMADHAN


Supervisor Engineer Pelaksana Lapangan
TIME SCHEDULE
Kegiatan : Pengelolaan Pendidikan Sekolah Menengah Pertama
Sub Kegiatan : Pembangunan Sarana, Prasarana dan Utilitas Sekolah
Pekerjaan : Pemb. MCK SMPN 5 Tambang Kec. Tambang
Lokasi : Kecamatan Tambang
Tahun Anggaran : 2022

Bobot Bulan-1 Bulan-2 Bulan-3


No. Uraian Pekerjaan Jumlah Harga (Rp.) Ket.
(%) 1 2 3 4 5 6 7 8 9 10 11 12

I. I. PEKERJAAN PERSIAPAN 1,300,000.00 1.34 1.34 .


II. II. PEKERJAAN PONDASI 4,679,840.72 4.82 2.41 2.41
III. III. PEKERJAAN STRUKTUR 16,366,848.09 16.84 3.37 3.37 3.37 3.37 3.37
IV. IV. PEKERJAAN DINDING 23,213,419.14 23.89 7.96 7.96 7.96
V. V. PEKERJAAN LANTAI 4,950,480.59 5.09 2.55 2.55
VI. VI. PEKERJAAN PLAFOND 6,173,794.56 6.35 6.35
VII. VII. PEKERJAAN KUSEN PINTU, JENDELA 7,130,062.80 7.34 3.67 3.67
VIII. VIII. PEKERJAAN PENGECATAN 4,552,825.32 4.68 4.68
IX. IX. PEKERJAAN ATAP 11,960,992.36 12.31 6.15 6.15
X. X. PEKERJAAN ELEKTRIKAL 2,248,800.00 2.31 2.31
XI. XI. PEKERJAAN SANITASI 14,311,829.79 14.73 7.36 7.36
XII. XII. PEKERJAAN LAIN-LAIN 290,000.00 0.30 0.30

(A) Jumlah Harga Pekerjaan 97,178,893.37 100.00


(B) PPN 11% 10,689,678.27
Jumlah Total Harga Pekerjaan (A+B) 107,868,571.64

Persentase Per Periode 3.75 2.41 3.37 3.37 3.37 3.37 11.33 7.96 14.12 12.37 22.25 12.35

Kumulatif Persentase 3.75 6.15 9.52 12.89 16.26 19.63 30.96 38.92 53.04 65.41 87.65 100.00

Rencana Kumulatif 12.89 38.92 100.00

Deviasi Negatif/Positif (-/+)


Waktu Pelaksanaan 90 (sembilan puluh) Hari Kalender

Bangkinang Kota, 29 April 2022

Penyedia,
CV. ALYANZA ABADI

ZULKIFLI ANNAS
Direktur