Anda di halaman 1dari 4

REKAPITULASI CCO PEKERJAAN TAMBAH KURANG ( CCO )

PROYEK PENATAAN RTH LINGKUNGAN KAWASAN KANTOR BUPATI


LOKASI KECAMATAN BANGKINANG KOTA
TAHUN ANGGARAN 2019

TOTAL HARGA PEKERJAAN TOTAL HARGA SETE


No. URAIAN PEKERJAAN
AWAL ( RP ) CCO ( RP )

A PEKERJAAN PERSIAPAN Rp. 950,000.00 Rp.


B PEKERJAAN PERKERASAN
A. PEKERJAAN DINDING BAGIAN LUAR Rp. 432,780,637.54 Rp.
B. PEKERJAAN DINDING BAGIAN DALAM Rp. 4,413,154.63 Rp.
C BLOCK A Rp. 19,980,546.96 Rp.
D BLOCK B Rp. 7,645,259.70 Rp.
E BLOCK C Rp. 9,073,060.10 Rp.
F BLOCK E Rp. 19,646,999.52 Rp.
G PEKERJAAN AMPHITEATHER Rp. 193,214,170.18 Rp.
H PEKERJAAN LAINNYA Rp. 72,509,683.15 Rp.
I #REF! Rp. #REF! Rp.
J #REF! Rp. #REF! Rp.
K #REF! Rp. #REF! Rp.
L #REF! Rp. #REF! Rp.
M PEKERJAAN AKHIR Rp. 500,000.00 Rp.

TOTAL Rp. #REF! Rp.


PPN 10 % Rp. #REF! Rp.
GRAND TOTAL Rp. #REF! Rp.
DIBULATKAN Rp. #REF! Rp.

Bangkinang, November 2007


Dibuat Oleh
CV. SERA RORA ABADI KONSULTAN

ARIF BUDIMAN, ST
SUPERVISI ENGINEERING
SI CCO PEKERJAAN TAMBAH KURANG ( CCO )

TOTAL HARGA SETELAH


CCO ( RP )

950,000.00

406,648,896.95
4,413,154.63
26,943,428.33
11,114,334.00
15,034,838.20
23,731,023.70
201,811,216.98
69,565,296.33
#REF!
#REF!
#REF!
#REF!
500,000.00

#REF!
#REF!
#REF!
#REF!

Bangkinang, November 2007


Dibuat Oleh
CV. SERA RORA ABADI KONSULTAN

ARIF BUDIMAN, ST
SUPERVISI ENGINEERING
RENCANA ANGGARAN BIAYA TAMBAH KURANG ( CCO )
KEGIATAN : PENATAAN RUANG TERBUKANHIJAU (RTH)
PROYEK : PENATAAN RTH LINGKUNGAN KAWASAN KANTOR BUPATI
LOKASI : KECAMATAN BANGKINANG KOTA
TAHUN ANGGARAN : 2019

JENIS PEKERJAAN AWAL JENIS PEKERJAAN TAMBAH JENIS PEKERJAAN KURANG JENIS PEKERJAAN SETELAH CCO
NO JENIS PEKERJAAN
VOLUME HARGA JUMLAH VOLUME HARGA JUMLAH VOLUME HARGA JUMLAH VOLUME HARGA JUMLAH
1 2 3 4 5 6 7 8 9 10 11 12 13 14
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan lokasi kerja dan pemasangan bowplank 1.00 Ls 500,000.00 500,000.00 1.00 Ls 500,000.00 500,000.00
2 Pek. Pembuatan Papan Nama Proyek 1.00 Ls 450,000.00 450,000.00 1.00 Ls 450,000.00 450,000.00

Sub Total 950,000.00 950,000.00

II PEKERJAAN PERKERASAN
PERKERASAN JALAN TAMAN
1 Pek. Pengecoran Lantai Camp. 1 PC : 2 PSR : 3 Krk t=0,10 m 158.85 M3 601,991.50 95,626,349.77 11.21 M3 601,991.50 6,748,324.72 147.64 M3 601,991.50 88,878,025.06
2 Pek. Pas Batu Andesite tile 30x60 (jalur sepeda & sepatu roda) 478.39 M2 201,762.00 96,520,923.18 10.05 M2 201,762.00 2,027,708.10 488.44 M2 201,762.00 98,548,631.28
3 Pek. Coating Batu Andesit Natural stone 478.39 M2 35,000.00 16,743,650.00 10.05 M2 35,000.00 351,750.00 488.44 M2 35,000.00 17,095,400.00
4 Pek. Pas Keramik Motif Korall (Ukuran 40x40) (jalur sepeda) 427.35 M2 121,713.90 52,014,435.17 11.55 M2 121,713.90 1,405,795.55 415.80 M2 121,713.90 50,608,639.62
5 Pek. Pas Keramik (Ukuran 25x40) Cutting setara 213.30 M2 35,000.00 7,465,500.00 21.3 M2 35,000.00 745,500.00 192.00 M2 35,000.00 6,720,000.00
6 Pek. Pas Batu Candi UK. 20x20 (Jalan pedestrian) 208.45 M2 253,977.90 52,941,693.25 21.83 M2 253,977.90 5,544,337.56 186.62 M2 253,977.90 47,397,355.70
7 Pek. Coating Batu Candi Naturan/black stone 208.45 M2 35,000.00 7,295,750.00 21.83 M2 35,000.00 764,050.00 186.62 M2 35,000.00 6,531,700.00
8 Pek. Pas Floor hardener di sekitar bangku taman 242.42 M2 236,984.00 57,449,661.28 46.60 M2 236,984.00 11,043,454.40 195.82 M2 236,984.00 46,406,206.88
9 Pek. Pas Guiding Block Warna Kuning 158.49 M1 52,102.60 8,257,741.07 10.64 M1 52,102.60 554,371.66 147.85 M1 52,102.60 7,703,369.41
10 Pek. Pas Kansteen type S 165.33 M1 232,655.50 38,464,933.82 7.33 M1 232,655.50 1,705,364.82 158.00 M1 232,655.50 36,759,569.00

Sub Total 432,780,637.54 406,648,896.95

III PEKERJAANTANAMAN
1 Pekerjaan Pengadaan dan Penanaman Tanaman
Pek. Tanah Urug Humus/Hitam 24.67 M3 178,887.50 4,413,154.63 24.67 M3 178,887.50 4,413,154.63

Sub Total 4,413,154.63 4,413,154.63

2 BLOCK A
Dolar/ficus repens 150.00 Btg 62,854.70 9,428,205.00 150.00 Btg 62,854.70 9,428,205.00
Pangkas Kuning 20.00 Btg 52,074.70 1,041,494.00 50 Btg 52,074.70 2,603,735.00 70.00 Btg 52,074.70 3,645,229.00
Trembesi 7.00 Btg 41,404.70 289,832.90 7.00 Btg 41,404.70 289,832.90
Keladi 100.00 Btg 55,000.00 5,500,000.00 50 Btg 55,000.00 2,750,000.00 150.00 Btg 55,000.00 8,250,000.00
Pengadaan dan penanaman Rumput Gajah Mini 119.76 M2 31,070.60 3,721,015.06 51.79 M2 31,070.60 1,609,146.37 171.55 M2 31,070.60 5,330,161.43

Sub Total 19,980,546.96 26,943,428.33

3 BLOCK B
Trembesi 4.00 Btg 41,404.70 165,618.80 2.00 Btg 41,404.70 82,809.40 6.00 Btg 41,404.70 248,428.20
Palm Raja 7.00 Btg 62,854.70 439,982.90 7.00 Btg 62,854.70 439,982.90 14.00 Btg 62,854.70 879,965.80
Pisang Hias Kalatea 50.00 Btg 51,854.70 2,592,735.00 50.00 Btg 51,854.70 2,592,735.00
Teh-tehan 50.00 Btg 51,854.70 2,592,735.00 30.00 Btg 51,854.70 1,555,641.00 80.00 Btg 51,854.70 4,148,376.00
Kembang Sepatu (Tinggi 40 cm) 40.00 Btg 46,354.70 1,854,188.00 30.00 Btg 46,354.70 1,390,641.00 70.00 Btg 46,354.70 3,244,829.00

Sub Total 7,645,259.70 11,114,334.00

4 BLOCK C
Pisang Hias kalatea 20.00 Btg 51,854.70 1,037,094.00 5.00 Btg 51,854.70 259,273.50 25.00 Btg 51,854.70 1,296,367.50
Kembang Sepatu (Tinggi 40 cm) 35.00 Btg 46,354.70 1,622,414.50 35.00 Btg 46,354.70 1,622,414.50 70.00 Btg 46,354.70 3,244,829.00

5 BLOCK D
Trembesi 3.00 Btg 41,404.70 124,214.10 3.00 Btg 41,404.70 124,214.10 6.00 Btg 41,404.70 248,428.20
Pisang Hias kalatea 35.00 Btg 51,854.70 1,814,914.50 15.00 Btg 51,854.70 777,820.50 50.00 Btg 51,854.70 2,592,735.00
Teh-tehan 55.00 Btg 51,854.70 2,852,008.50 30.00 Btg 51,854.70 1,555,641.00 85.00 Btg 51,854.70 4,407,649.50
Kembang Sepatu (Tinggi 40 cm) 35.00 Btg 46,354.70 1,622,414.50 35.00 Btg 46,354.70 1,622,414.50 70.00 Btg 46,354.70 3,244,829.00

Sub Total 9,073,060.10 15,034,838.20

6 BLOCK E
Trembesi 3.00 Btg 41,404.70 124,214.10 2.00 Btg 41,404.70 82,809.40 5.00 Btg 41,404.70 207,023.50
Glondongan Tiang (Tinggi 250) 6.00 Btg 28,204.70 169,228.20 4.00 Btg 28,204.70 112,818.80 10.00 Btg 28,204.70 282,047.00
Pisang Hias kalatea 10.00 Btg 51,854.70 518,547.00 10.00 Btg 51,854.70 518,547.00 20.00 Btg 51,854.70 1,037,094.00
Kucai/liliaceae 400.00 Btg 16,104.70 6,441,880.00 300 Btg 16,104.70 4,831,410.00 700.00 Btg 16,104.70 11,273,290.00
Pengadaan dan penanaman Rumput Gajah Mini 398.87 M1 31,070.60 12,393,130.22 47.04 M2 31,070.60 1,461,561 351.83 M1 31,070.60 10,931,569.20

Sub Total 19,646,999.52 23,731,023.70

IV PEKERJAAN AMPHITEATHER
1 Pek. Galian 61.19 M3 56,512.50 3,457,999.88 61.19 M3 56,512.50 3,457,999.88
2 Pek. Pengurungan Pasir dibawah Pondasi 6.22 M3 148,005.00 920,591.10 6.22 M3 148,005.00 920,591.10
3 Pek. Pengurangan Tanah 297.84 M3 103,647.00 30,870,222.48 297.84 M3 103,647.00 30,870,222.48
4 Pek. Pas Turap Batu Kali 47.70 M3 808,390.00 38,560,203.00 47.70 M3 808,390.00 38,560,203.00
5 Pek. Sloof Beton Tulang (Besi+bekisting) 1.62 M3 3,074,615.50 4,980,877.11 1.62 3,074,616 4,980,877 0.00 M3 3,074,615.50 -
6 Pek. Pas. Dinding bata merah Tebal 1 batu camp. 1PC:3PP 165.45 M2 200,068.00 33,101,250.60 165.45 M2 200,068.00 33,101,250.60
7 Pek. Pas. Dinding bata merah Tebal 1/2 batu camp. 1PC:3PP 160.95 M2 96,449.10 15,523,482.65 16.06 96,449.10 1,548,973 144.89 M2 96,449.10 13,974,510.10
8 Pek. Pas plester kolam 94.00 M2 51,803.18 4,869,498.92 94.00 M2 51,803.18 4,869,498.92
9 Pek. Pas. Acian kolam 94.00 M2 30,167.50 2,835,745.00 94.00 M2 30,167.50 2,835,745.00
10 Pek. Cor Lantai Tribun Camp. 1 PC : 2 Psr : 3 Krk t=0,10 m 16.23 M3 601,991.50 9,770,322.05 2.08 M3 601,991.50 1,252,142 14.15 M3 601,991.50 8,518,179.73
11 Pek. Cor Lantai Amphiteater Camp. 1 PC : 2 Psr : 3 Krk t=0,10 m 7.85 M3 601,991.50 4,725,633.27 7.85 M3 601,991.50 4,725,633.27
12 Pek. Cor Lantai Kolam Camp. 1 PC : 2 Psr : 3 Krk t=0,10 m 12.88 M3 601,991.50 7,753,650.52 4.10 M3 601,991.50 2,468,165 8.78 M3 601,991.50 5,285,485.37
13 Pek. Cor Lantai Ramp t=0,10 m (+Besi) 4.60 M3 601,991.50 2,769,160.90 4.60 M3 601,991.50 2,769,160.90
14 Pek. Pas. Pipa PVC 04' AW 84.00 M1 136,436.85 11,460,695.40 84.00 M1 136,436.85 11,460,695.40
15 Pek. Bak Kontrol pasang bata 45cm x 45cm tinggi 50cm 4.00 Bh 460,424.80 1,841,699.20 4.00 Bh 460,424.80 1,841,699.20

16 Pek. Pas Batu Tempel Acak (Andesit Natural/Pecah) keliling amphi 131.44 M2 64,915.40 8,532,480.18 13.05 M2 64,915.40 847145.97 144.49 M2 64,915.40 9,379,626.15
17 Pek. Pas Keramik motif brick acak uk. 40x40 lantai 67.30 M2 128,847.40 8,671,430.02 67.30 M2 128,847.40 8,671,430.02
18 Pek. Pengadaan dan penanaman Rumput Gajah Mini 82.69 M2 31,070.60 2,569,227.91 13.91 M2 31,070.60 432,192.05 96.60 M2 31,070.60 3,001,419.96
19 Pek. Ring Balok 10 x 15 165.41 M' 78,428.79 12,972,906.15 165.41 M' 78,428.79 12,972,906.15
20 Pek. Kolom Praktis 11 x 11 27.00 M' 64,654.48 1,745,670.96 27.00 M' 64,654.48 1,745,670.96
21 Pek. Plesteran siar 43.01 M2 51,803.18 2,228,054.77 43.01 M2 51,803.18 2,228,054.77 43.01 M2 51,803.18 2,228,054.77
22 Pek. Coating Batu kali 17.75 M2 35,000.00 621,234.02 17.75 M2 35,000.00 621,234.02 17.75 M2 35,000.00 621,234.02

Sub Total 193,214,170.18 201,811,216.98

V PEKERJAAN LAINNYA
1 Pek. Galian Pondasi pada Pergola 0.32 M3 56,512.50 18,084.00 0.32 M3 56,512.50 18,084.00
2 Pek. Cor Pondasi Umpak pada Pergola 0.32 M3 3,172,758.60 1,015,282.75 0.32 M3 3,172,758.60 1,015,282.75
3 Pek. Pengadaan dan Pemasangan Pergola (termasuk pengecatan) 102.35 M2 486,450.80 49,788,239.38 102.35 M2 486,450.80 49,788,239.38
4 Pek. Pengadaan dan Pemasangan Sign direktion board 2.00 Unit 115,000.00 230,000.00 2.00 Unit 115,000.00 230,000.00
5 Pek. Pemasangan LED Letter Box (T. 100 cm) + instalasi dan lampu 6.00 Bh 120,000.00 720,000.00 6.00 Bh 120,000.00 720,000.00
6 Pek. Pemasangan Lampu Spot (Downlight outdoor) + Instalasi 12.00 Bh 120,000.00 1,440,000.00 12.00 Bh 120,000.00 1,440,000.00
7 Pek. Pemasangan Lampu Taman (Tiang+Lampu+Instalasi) 9.00 Bh 120,000.00 1,080,000.00 9.00 Bh 120,000.00 1,080,000.00
8 Pek. Pas. MCB 2.00 Bh 66,200.00 132,400.00 2.00 Bh 66,200.00 132,400.00
9 Pek. Pas. Bok MCB 1.00 Bh 75,000.00 75,000.00 1.00 Bh 75,000.00 75,000.00
10 Pek. Pengecoran Bangku Taman 10.73 M3 601,991.50 6,459,368.80 10.73 M3 601,991.50 6,459,368.80
11 Pek. Plasteran Bangku Taman 140.92 M2 51,803.18 7,300,104.13 35.92 m2 51,803.18 1,860,770 105.00 M2 51,803.18 5,439,333.90
12 Pek. Pengacian Bangku Taman 140.92 M2 30,167.50 4,251,204.10 35.92 m2 30,167.50 1,083,617 105.00 M2 30,167.50 3,167,587.50

72,509,683.15 69,565,296.33

VI PEKERJAAN AKHIR
1 Pek. Pembersihan Lokasi Setelah selesai pekerjaan 1.00 Ls 500,000.00 500,000.00 1.00 Ls 500,000.00 500,000.00
Sub Total
500,000.00 500,000.00

43,165,981.00 43,167,303.67

JUMLAH TOTAL 760,713,511.78 760,712,189.11

DISETUJUI OLEH : DIPERIKSA OLEH : DIPERIKSA OLEH : DIBUAT OLEH : DISETUJUI OLEH : DISETUJUI OLEH : DISETUJUI OLEH :
DIKETAHUI/DISETUJUI OLEH : KETUA SEKRETARIS ANGGOTA
DIREKSI PENGAWAS KONSULTAN PENGAWAS KONTRAKTOR PELAKSANA
PEJABAT PEMBUAT KOMITMEN (PPK) PANITIA CCO PANITIA CCO PANITIA CCO
CV. KITO CONSULTANT CV. CAHAYA JINGGA

MAULUDDIN, ST ADLIS, ST SYARKANI ARIEF, ST KRISTIAN SILALAHI,ST


ANDRY BRILLIANSAH, ST,MT KRISTIAN SILALAHI, ST MUHAMMAD IQBAL, ST SAHRIAL
NIP. 19720425 199311 1 001 NIP. 19690409 199603 1 004 NIP. 19760301 200501 1 007 NIP. 19941225 201903 1 001
NIP. 19841229 201001 1 014 NIP. 19941225 201903 1 001 DIREKTUR DIREKTUR

Anda mungkin juga menyukai