Anda di halaman 1dari 172

RENCANA ANGGARAN BIAYA ( RAB )

REKAPITULASI
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG
LOKASI :
TH. ANGGARAN :

NO URAIAN PEKERJAAN JUMLAH HARGA

A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN Rp 195,975,596.00
II PEKERJAAN PONDASI & PILE CAP Rp 925,140,962.65
III PEKERJAAN TANAH Rp 4,450,443.41
IV PEKERJAAN BETON BERTULANG Rp 2,231,554,287.27
V PEKERJAAN RANGKA BAJA & PENUTUP ATAP Rp 202,046,190.10

B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA Rp 1,874,747,586.08
II PEKERJAAN PLAFOND Rp 100,339,844.39
III PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 464,457,068.79
IV PEKERJAAN PENGECATAN Rp 116,740,307.94
V PEKERJAAN SANITAIR Rp 103,973,403.00
VI PEKERJAAN PENGADAAN RALLING , MEJA COUNTER & WALL PROTE Rp 34,783,000.00
VII PEKERJAAN LAIN - LAIN

C PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING


I PEKERJAAN PENYAMBUNGAN LISTRIK Rp 312,048,000.00
II PEKERJAAN MDP DAN SDP Rp 351,815,004.00
III PEKERJAAN PANEL Rp 1,015,170,164.00
IV PEKERJAAN PENERANGAN Rp 134,050,527.33
V PEKERJAAN TATA UDARA Rp 1,841,988,606.94
VI PEKERJAAN PLUMBING Rp 392,861,451.22
VII PEKERJAAN TELEPHONE & LAN Rp 41,678,000.00
VIII PEKERJAAN INSTALASI CCTV Rp 43,885,950.00
IX PEKERJAAN INSTALASI TATA SUARA Rp 79,833,250.00
X PEKERJAAN FIRE ALARM & FIRE EXTINGUSHER Rp 38,915,950.00
XI PEKERJAAN LIFT Rp 480,000,000.00
XII PEKERJAAN GAS MEDIS Rp 472,021,738.00
XIII PEKERJAAN PENANGKAL PETIR Rp 61,000,000.00

JUMLAH Rp 11,519,477,331.12
PPN 10 % Rp 1,151,947,733.11
JUMLAH SETELAH PPN 10% Rp 12,671,425,064.23
DIBULATKAN Rp 12,671,425,000.00
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1320 #REF! #REF!
Tukang batu L.0.02 OH 0.0220 #REF! #REF!
Kepala tukang L.0.03 OH 0.0020 #REF! #REF!
Mandor L.0.04 OH 0.0070 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 26.0800 #REF! #REF!
Pasir beton Kg 60.8000 -
Kerikil (maks 30mm) Kg 82.3200 -
Air L 17.2000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1650 #REF! #REF!
Tukang batu L.0.02 OH 0.0280 #REF! #REF!
Kepala tukang L.0.03 OH 0.0030 #REF! #REF!
Mandor L.0.04 OH 0.0080 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 32.6000 #REF! #REF!
Pasir beton Kg 76.0000 -
Kerikil (maks 30mm) Kg 102.9000 -
Air L 21.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

2
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1960 #REF! #REF!
Tukang batu L.0.02 OH 0.0330 #REF! #REF!
Kepala tukang L.0.03 OH 0.0030 #REF! #REF!
Mandor L.0.04 OH 0.0100 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 32.1200 #REF! #REF!
Pasir beton Kg 91.2000 -
Kerikil (maks 30mm) Kg 123.4800 -
Air L 25.8000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2.4 Pembuatan 1 m2 lahan produksi tebal 15cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.2480 #REF! #REF!
Tukang batu L.0.02 OH 0.0410 #REF! #REF!
Kepala tukang L.0.03 OH 0.0040 #REF! #REF!
Mandor L.0.04 OH 0.0130 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 48.9000 #REF! #REF!
Pasir beton Kg 114.0000 -
Kerikil (maks 30mm) Kg 154.3500 -
Air L 32.2500 #REF! #REF!

3
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2.5 Pembuatan 1 m2 bekistig untuk plat beton pracetak ( 5 kali pakai)


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0070 #REF! #REF!
Tukang batu L.0.02 OH 0.0760 #REF! #REF!
Kepala tukang L.0.03 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0010 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Lantai kerja tebal 10cm m3 0.0800 -
Besi hollow 50.50.3 Kg 9.3940 -
Kayu kaso 5/7 m3 0.0050 -
Phenol film 12mm Lbr 0.0800 -
Minyak bekisting L 0.2000 #REF! #REF!
Dinabolt dia 12mm (10- Bh 3.8820 #REF! #REF!
15cm)
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2.6 Pembuatan 1 m2 bekistig untuk balok beton pracetak ( 10 - 12 kali pakai)


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0040 #REF! #REF!
Tukang batu L.0.02 OH 0.0380 #REF! #REF!
Kepala tukang L.0.03 OH 0.0040 #REF! #REF!

4
Mandor L.0.04 OH 0.0010 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Kayu kaso 5/7 m3 0.0050 -
Phenol film 12mm Lbr 0.0430 -
Minyak bekisting L 0.2000 #REF! #REF!
Dinabolt dia 12mm (10- 0.6930
Bh -
15cm)
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2.7 Pembuatan 1 m2 bekistig untukkolom beton pracetak ( 10 - 12 kali pakai)


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0040 #REF! #REF!
Tukang batu L.0.02 OH 0.0380 #REF! #REF!
Kepala tukang L.0.03 OH 0.0040 #REF! #REF!
Mandor L.0.04 OH 0.0010 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Kayu kaso 5/7 3 0.0040 -
Phenol film 12mm Lbr 0.0480 -
Minyak bekisting L 0.2000 #REF! #REF!
Paku 5-7cm Kg 0.0460 #REF! #REF!
Dinabolt dia 12mm (10-
Bh 0.6930 -
15cm)
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

5
A.4.1.2 8 Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0530 #REF! #REF!
Tukang kayu OH 0.0180 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0890 #REF! #REF!
Tukang kayu OH 0.0300 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 10 Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0710 #REF! #REF!
Tukang kayu OH 0.0240 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!

6
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 11 Penuangan/menebar beton untuk 1 buah komponen plat pracetak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0640 #REF! #REF!
Tukang batu L.0.02 OH 0.2440 #REF! #REF!
Tukang vibrator L.0.02 OH 0.1280 -
Kepala Tukang L.0.03 OH 0.0340 #REF! #REF!
Mandor L.0.04 OH 0.0730 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 12 Penuangan/menebar beton untuk 1 buah komponen balok pracetak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0690 #REF! #REF!
Tukang batu L.0.02 OH 0.2420 #REF! #REF!
Tukang vibrator L.0.02 OH 0.1380 -
Kepala Tukang L.0.03 OH 0.0370 #REF! #REF!
Mandor L.0.04 OH 0.0730 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN

7
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 13 Penuangan/menebar beton untuk 1 buah komponen kolom pracetak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0610 #REF! #REF!
Tukang batu L.0.02 OH 0.2130 #REF! #REF!
Tukang vibrator L.0.02 OH 0.1220 -
Kepala Tukang L.0.03 OH 0.0330 #REF! #REF!
Mandor L.0.04 OH 0.0730 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 14 Mendirikan 1 buah komponen plat pracetak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0670 #REF! #REF!
Tukang batu L.0.02 OH 0.0670 #REF! #REF!
Tukang erection L.0.02 OH 0.1340 -
Kepala Tukang L.0.03 OH 0.0670 #REF! #REF!
Mandor L.0.04 OH 0.0670 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 6.6760 #REF! #REF!
JUMLAH HARGA BAHAN #REF!

8
C PERALATAN
Sewa crane UH 0.0670 -
Sewa pipe support UH 1.1000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 15 Mendirikan 1 buah komponen balok pracetak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0610 #REF! #REF!
Tukang batu L.0.02 OH 0.0610 #REF! #REF!
Tukang erection L.0.02 OH 0.1220 -
Operator crane OH 0.0610 -
Pembantu operator crane OH 0.0610 -
Kepala Tukang L.0.03 OH 0.0610 #REF! #REF!
Mandor L.0.04 OH 0.0610 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 6.1100 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Sewa crane UH 0.0610 -
Sewa chaffolding UH 1.1000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 16 Mendirikan 1 buah komponen kolom pracetak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0830 #REF! #REF!
Tukang batu L.0.02 OH 0.0830 #REF! #REF!
Tukang erection L.0.02 OH 0.1660 -
Operator crane OH 0.0830 -
Pembantu operator crane OH 0.0830 -

9
Kepala Tukang L.0.03 OH 0.0830 #REF! #REF!
Mandor L.0.04 OH 0.0830 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 8.2770 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Sewa crane UH 0.0830 -
Sewa pipe support UH 2.2000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 17 Melangsir 1 buah komponen plat pracetak ( ± 20 m)


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0190 #REF! #REF!
Tukang batu L.0.02 OH 0.0380 #REF! #REF!
Operator crane OH 0.0190 -
Pembantu operator crane OH 0.0190 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 1.8970 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 18 Melangsir 1 buah komponen balok pracetak ( ± 20 m)


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0190 #REF! #REF!
Tukang batu L.0.02 OH 0.0380 #REF! #REF!
Operator crane OH 0.0190 -

10
Pembantu operator crane OH 0.0190 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 1.8970 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 19 Melangsir 1 buah komponen kolom pracetak ( ± 20 m)


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0190 #REF! #REF!
Tukang batu L.0.02 OH 0.0380 #REF! #REF!
Operator crane OH 0.0190 -
Pembantu operator crane OH 0.0190 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 1.8970 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 20 Bahan 1 m3 grouting campuran


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,200.0000 -
Screening Kg 650.0000 -
Air L 350.0000 #REF! #REF!

11
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 21 Bahan 1 m3 grouting tidak campuran


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
JUMLAH TENAGA KERJA
B BAHAN
Semen grout Kg 1,850.0000 -
Air L 400.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 22 Upah melakukan 1 titik grouting pada join pracetak


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Tukang batu L.0.02 OH 0.3670 #REF! #REF!
Kepala tukang L.0.03 OH 0.0740 #REF! #REF!
Mandor L.0.04 OH 0.0370 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

12
A.4.1.2 23 Pemasangan 1 titik Bekisting join pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja 0.1470 #REF! #REF!
Tukang kayu L.0.02 OH 0.1470 #REF! #REF!
Kepala tukang L.0.03 OH 0.0150 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Kayu kaso 5/7 m3 0.0120 -
Papan cor m3 0.0040 -
Paku 5-7cm Kg 0.2640 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.4.1.2 24 Upah 1 titik Join dengan Sling


Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja 0.2200 #REF! #REF!
Tukang kayu L.0.02 OH 0.2200 #REF! #REF!
Tukang besi L.0.02 OH 0.2200 #REF! #REF!
Mandor L.0.04 OH 0.0110 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

13
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm
Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 0.0810 #REF! #REF!
Tukang pipa L.0.02 OH 0.0410 -
Mandor L.0.04 OH 0.0080 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa PVC Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0060 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.2 Pemasangan 1 m pipa PVC Ø 90 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0940 #REF! #REF!
Tukang pipa L.0.02 OH 0.0470 -
Mandor L.0.04 OH 0.0090 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa PVC Ø 90 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0080 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.3 Pemasangan 1 m pipa PVC Ø 110 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1050 #REF! #REF!
Tukang pipa L.0.02 OH 0.0530 -
Mandor L.0.04 OH 0.0110 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa PVC Ø 110 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0100 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.4 Pemasangan 1 m pipa PVC Ø 150 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1180 #REF! #REF!
Tukang pipa L.0.02 OH 0.0590 -
Mandor L.0.04 OH 0.0120 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa PVC Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0120 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.5 Pemasangan 1 m pipa PVC Ø 200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1890 #REF! #REF!
Tukang pipa L.0.02 OH 0.0950 -
Mandor L.0.04 OH 0.0190 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa PVC Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0240 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.6 Pemasangan 1 m pipa PVC Ø 250 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.2560 #REF! #REF!
Tukang pipa L.0.02 OH 0.1280 -
Mandor L.0.04 OH 0.0260 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0340 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.7 Pemasangan 1 m pipa PVC Ø 300 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.2940 #REF! #REF!
Tukang pipa L.0.02 OH 0.1470 -
Mandor L.0.04 OH 0.0290 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.0400 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.8 Pemasangan 1 m pipa PVC Ø 400 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.5440 #REF! #REF!
Tukang pipa L.0.02 OH 0.2720 -
Mandor L.0.04 OH 0.0540 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0800 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.9 Pemasangan 1 m pipa PVC Ø 450 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 0.6690 #REF! #REF!
Tukang pipa L.0.02 OH 0.3350 -
Mandor L.0.04 OH 0.0670 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.1000 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.10 Pemasangan 1 m pipa PVC Ø 500 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.8090 #REF! #REF!
Tukang pipa L.0.02 OH 0.4050 -
Mandor L.0.04 OH 0.0810 #REF! #REF!
#REF!
B BAHAN
Pipa PVC Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.1220 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.11 Pemasangan 1 m pipa PVC Ø 600 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9570 #REF! #REF!
Tukang pipa L.0.02 OH 0.4790 -
Mandor L.0.04 OH 0.0960 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.1450 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.12 Pemasangan 1 m pipa PVC Ø 800 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.6180 #REF! #REF!
Tukang pipa L.0.02 OH 0.8090 -
Mandor L.0.04 OH 0.1620 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.2500 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.13 Pemasangan 1 m pipa PVC Ø 900 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 1.6910 #REF! #REF!
Tukang pipa L.0.02 OH 0.8460 -
Mandor L.0.04 OH 0.1690 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.2620 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.14 Pemasangan 1 m pipa PVC Ø 1000 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.8950 #REF! #REF!
Tukang pipa L.0.02 OH 0.9480 -
Mandor L.0.04 OH 0.1900 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.2940 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.15 Pemasangan 1 m pipa PVC Ø 1100 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.0990 #REF! #REF!
Tukang pipa L.0.02 OH 1.0500 -
Mandor L.0.04 OH 0.2100 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.3270 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.16 Pemasangan 1 m pipa PVC Ø 1200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 2.3030 #REF! #REF!
Tukang pipa L.0.02 OH 1.1520 -
Mandor L.0.04 OH 0.2300 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3590 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.17 Pemasangan 1 m pipa HDPE Ø 63 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0350 #REF! #REF!
Tukang pipa L.0.02 OH 0.0170 -
Mandor L.0.04 OH 0.0030 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0190 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.18 Pemasangan 1 m pipa HDPE Ø 100 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0400 #REF! #REF!
Tukang pipa L.0.02 OH 0.0200 -
Mandor L.0.04 OH 0.0040 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0190 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.19 Pemasangan 1 m pipa HDPE Ø 125 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0450 #REF! #REF!
Tukang pipa L.0.02 OH 0.0230 -
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0190 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.20 Pemasangan 1 m pipa HDPE Ø 150 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0620 #REF! #REF!
Tukang pipa L.0.02 OH 0.0310 -
Mandor L.0.04 OH 0.0060 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0190 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.21 Pemasangan 1 m pipa HDPE Ø 200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1020 #REF! #REF!
Tukang pipa L.0.02 OH 0.0510 -
Mandor L.0.04 OH 0.0100 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0190 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.8.4.1.22 Pemasangan 1 m pipa HDPE Ø 250 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1330 #REF! #REF!
Tukang pipa L.0.02 OH 0.0670 -
Mandor L.0.04 OH 0.0130 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0420 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.23 Pemasangan 1 m pipa HDPE Ø 300 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1700 #REF! #REF!
Tukang pipa L.0.02 OH 0.0850 -
Mandor L.0.04 OH 0.0170 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0650 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.24 Pemasangan 1 m pipa HDPE Ø 400 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.2900 #REF! #REF!
Tukang pipa L.0.02 OH 0.1450 -
Mandor L.0.04 OH 0.0290 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.1520 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.25 Pemasangan 1 m pipa HDPE Ø 450 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.3590 #REF! #REF!
Tukang pipa L.0.02 OH 0.1800 -
Mandor L.0.04 OH 0.0360 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.2000 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.26 Pemasangan 1 m pipa HDPE Ø 500 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.4330 #REF! #REF!
Tukang pipa L.0.02 OH 0.2160 -
Mandor L.0.04 OH 0.0430 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.2510 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.27 Pemasangan 1 m pipa HDPE Ø 600 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 0.5120 #REF! #REF!
Tukang pipa L.0.02 OH 0.2560 -
Mandor L.0.04 OH 0.0510 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3070 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.28 Pemasangan 1 m pipa HDPE Ø 800 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.8930 #REF! #REF!
Tukang pipa L.0.02 OH 0.4460 -
Mandor L.0.04 OH 0.0890 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.5730 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.29 Pemasangan 1 m pipa HDPE Ø 900 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 1.3530 #REF! #REF!
Tukang pipa L.0.02 OH 0.6770 -
Mandor L.0.04 OH 0.1350 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.8830 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.30 Pemasangan 1 m pipa HDPE Ø 1000 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.6590 #REF! #REF!
Tukang pipa L.0.02 OH 0.8300 -
Mandor L.0.04 OH 0.1660 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 1.0930 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.31 Pemasangan 1 m pipa HDPE Ø 1100 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 1.8180 #REF! #REF!
Tukang pipa L.0.02 OH 0.9090 -
Mandor L.0.04 OH 0.1820 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 1.2050 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.32 Pemasangan 1 m pipa HDPE Ø 1200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.3700 #REF! #REF!
Tukang pipa L.0.02 OH 1.1850 -
Mandor L.0.04 OH 0.2370 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 1.5840 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.33 Pemasangan 1 m pipa GIP Ø 63 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.3450 #REF! #REF!
Tukang pipa L.0.02 OH 0.1720 -
Mandor L.0.04 OH 0.0340 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.34 Pemasangan 1 m pipa GIP Ø 100 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.4000 #REF! #REF!
Tukang pipa L.0.02 OH 0.2000 -
Mandor L.0.04 OH 0.0400 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.35 Pemasangan 1 m pipa GIP Ø 125 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 0.4480 #REF! #REF!
Tukang pipa L.0.02 OH 0.2240 -
Mandor L.0.04 OH 0.0450 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.36 Pemasangan 1 m pipa GIP Ø 150 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.5060 #REF! #REF!
Tukang pipa L.0.02 OH 0.2530 -
Mandor L.0.04 OH 0.0510 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.37 Pemasangan 1 m pipa GIP Ø 200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 0.7960 #REF! #REF!
Tukang pipa L.0.02 OH 0.3980 -
Mandor L.0.04 OH 0.0800 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.38 Pemasangan 1 m pipa GIP Ø 250 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.9490 #REF! #REF!
Tukang pipa L.0.02 OH 0.4750 -
Mandor L.0.04 OH 0.0950 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.39 Pemasangan 1 m pipa GIP Ø 300 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.9580 #REF! #REF!
Tukang pipa L.0.02 OH 0.4790 -
Mandor L.0.04 OH 0.0960 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.40 Pemasangan 1 m pipa GIP Ø 400 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.2120 #REF! #REF!
Tukang pipa L.0.02 OH 0.6060 -
Mandor L.0.04 OH 0.1210 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.41 Pemasangan 1 m pipa GIP Ø 450 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.3530 #REF! #REF!
Tukang pipa L.0.02 OH 0.6760 -
Mandor L.0.04 OH 0.1350 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.42 Pemasangan 1 m pipa GIP Ø 500 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.4690 #REF! #REF!
Tukang pipa L.0.02 OH 0.7350 -
Mandor L.0.04 OH 0.1470 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT 0

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.43 Pemasangan 1 m pipa GIP Ø 600 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.3270 #REF! #REF!
Tukang pipa L.0.02 OH 0.6640 -
Mandor L.0.04 OH 0.1330 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.44 Pemasangan 1 m pipa GIP Ø 800 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.3270 #REF! #REF!
Tukang pipa L.0.02 OH 1.1630 -
Mandor L.0.04 OH 0.2330 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.45 Pemasangan 1 m pipa GIP Ø 900 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.6230 #REF! #REF!
Tukang pipa L.0.02 OH 1.3120 -
Mandor L.0.04 OH 0.2620 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.46 Pemasangan 1 m pipa GIP Ø 1000 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 2.9110 #REF! #REF!
Tukang pipa L.0.02 OH 1.4560 -
Mandor L.0.04 OH 0.2910 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.47 Pemasangan 1 m pipa GIP Ø 1100 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.0.01 OH 3.2000 #REF! #REF!
Tukang pipa L.0.02 OH 1.6000 -
Mandor L.0.04 OH 0.3200 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.48 Pemasangan 1 m pipa GIP Ø 1200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 3.4880 #REF! #REF!
Tukang pipa L.0.02 OH 1.7440 -
Mandor L.0.04 OH 0.3490 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.49 Pemasangan 1 m pipa DCI Ø 100 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.4890 #REF! #REF!
Tukang pipa L.0.02 OH 0.0980 -
Mandor L.0.04 OH 0.0490 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.50 Pemasangan 1 m pipa DCI Ø 125 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5470 #REF! #REF!
Tukang pipa L.0.02 OH 0.1090 -
Mandor L.0.04 OH 0.0550 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3800 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.51 Pemasangan 1 m pipa DCI Ø 150 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.6130 #REF! #REF!
Tukang pipa L.0.02 OH 0.1230 -
Mandor L.0.04 OH 0.0610 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.52 Pemasangan 1 m pipa DCI Ø 200 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.8550 #REF! #REF!
Tukang pipa L.0.02 OH 0.1710 -
Mandor L.0.04 OH 0.0850 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 200 mm M 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.3800 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.53 Pemasangan 1 m pipa DCI Ø 250 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.9510 #REF! #REF!
Tukang pipa L.0.02 OH 0.1900 -
Mandor L.0.04 OH 0.0950 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 250 mm M 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0500 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.54 Pemasangan 1 m pipa DCI Ø 300 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 0.9730 #REF! #REF!
Tukang pipa L.0.02 OH 0.1950 -
Mandor L.0.04 OH 0.0970 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0710 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.55 Pemasangan 1 m pipa DCI Ø 400 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.5450 #REF! #REF!
Tukang pipa L.0.02 OH 0.3090 -
Operator alat berat L.0.08 OH 0.0930 -
Mandor L.0.04 OH 0.1540 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.0230 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle hari 0.0310 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.56 Pemasangan 1 m pipa DCI Ø 450 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.8130 #REF! #REF!
Tukang pipa L.0.02 OH 0.3630 -
Operator alat berat L.0.08 OH 0.1430 -
Mandor L.0.04 OH 0.1810 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.0290 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0390 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.57 Pemasangan 1 m pipa DCI Ø 500 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.0470 #REF! #REF!
Tukang pipa L.0.02 OH 0.4090 -
Operator alat berat L.0.08 OH 0.1930 -
Mandor L.0.04 OH 0.2050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
kap 0,5 -1,0 m3 hari 0.0340 -
Sewa Tripot/Tackel & handle
hari 0.0450 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.58 Pemasangan pipa 1 m DCI Ø 600 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.0110 #REF! #REF!
Tukang pipa L.0.02 OH 0.4020 -
Operator alat berat L.0.08 OH 0.2930 -
Mandor L.0.04 OH 0.2010 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.0580 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
hari 0.0770 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.59 Pemasangan 1 m pipa DCI Ø800 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 3.8590 #REF! #REF!
Tukang pipa L.0.02 OH 0.7720 -
Operator alat berat L.0.08 OH 0.4930 -
Mandor L.0.04 OH 0.3860 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.0840 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
hari 0.2250 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.60 Pemasangan 1 m pipa DCI Ø900 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 4.9950 #REF! #REF!
Tukang pipa L.0.02 OH 0.9990 -
Operator alat berat L.0.08 OH 0.5930 -
Mandor L.0.04 OH 0.4990 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.0930 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
hari 0.2480 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.61 Pemasangan 1 m pipa DCI Ø1000 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 5.9310 #REF! #REF!
Tukang pipa L.0.02 OH 1.1860 -
Operator alat berat L.0.08 OH 0.7930 -
Mandor L.0.04 OH 0.6930 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.1120 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
hari 0.2980 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.62 Pemasangan 1 m pipa DCI Ø1100 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 6.9490 #REF! #REF!
Tukang pipa L.0.02 OH 1.3900 -
Operator alat berat L.0.08 OH 0.7930 -
Mandor L.0.04 OH 0.6950 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
kap 0,5 -1,0 m3 hari 0.1520 -

Sewa Tripot/Tackel & handle hari 0.3040 -


crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.63 Pemasangan 1 m pipa DCI Ø1200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 8.0560 #REF! #REF!
Tukang pipa L.0.02 OH 1.6110 -
Operator alat berat L.0.08 OH 0.8930 -
Mandor L.0.04 OH 0.8060 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225 hari 0.1800 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
crane 2 T hari 0.3600 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.64 Pemasangan 1 m pipa baja Ø 63 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.4990 #REF! #REF!
Tukang pipa L.0.02 OH 0.1000 -
Mandor L.0.04 OH 0.0500 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.65 Pemasangan 1 m pipa baja Ø 100 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.5790 #REF! #REF!
Tukang pipa L.0.02 OH 0.1160 -
Mandor L.0.04 OH 0.0580 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0040 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.66 Pemasangan 1 m pipa baja Ø 125 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.6480 #REF! #REF!
Tukang pipa L.0.02 OH 0.1300 -
Mandor L.0.04 OH 0.0650 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.67 Pemasangan 1 m pipa baja Ø 150 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.7080 #REF! #REF!
Tukang pipa L.0.02 OH 0.1420 -
Mandor L.0.04 OH 0.0710 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.68 Pemasangan 1 m pipa baja Ø 200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 1.1130 #REF! #REF!
Tukang pipa L.0.02 OH 0.2230 -
Mandor L.0.04 OH 0.1110 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0040 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.69 Pemasangan pipa baja Ø 250 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 1.3250 #REF! #REF!
Tukang pipa L.0.02 OH 0.2650 -
Mandor L.0.04 OH 0.1330 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0040 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.70 Pemasangan 1 m pipa baja Ø 300 mm


Harga Sat uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4150 #REF! #REF!
Tukang pipa L.0.02 OH 0.2830 -
Mandor L.0.04 OH 0.1410 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0040 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.71 Pemasangan 1 m pipa baja Ø 400 mm

No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.3660 #REF! #REF!
Tukang pipa L.0.02 OH 0.4730 -
Mandor L.0.04 OH 0.2370 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225 hari 0.0270 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
hari 0.0390 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.72 Pemasangan 1 m pipa baja Ø 450 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.2310 #REF! #REF!
Tukang pipa L.0.02 OH 0.4460 -
Mandor L.0.04 OH 0.2230 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225 hari 0.0260 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0370 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.73 Pemasangan 1 m pipa baja Ø 500 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.4320 #REF! #REF!
Tukang pipa L.0.02 OH 0.4860 -
Mandor L.0.04 OH 0.2430 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225 hari 0.0290 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0450 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.74 Pemasangan 1 m pipa baja Ø 600 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.2080 #REF! #REF!
Tukang pipa L.0.02 OH 0.4420 -
Mandor L.0.04 OH 0.2210 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 600 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225 hari 0.0270 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0390 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.75 Pemasangan 1 m pipa baja Ø 800 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 3.8970 #REF! #REF!
Tukang pipa L.0.02 OH 0.7790 -
Mandor L.0.04 OH 0.3900 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.0460 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0980 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.76 Pemasangan 1 m pipa baja Ø 900 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 4.4030 #REF! #REF!
Tukang pipa L.0.02 OH 0.0810 -
Mandor L.0.04 OH 0.4400 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
kap 0,5 -1,0 m3 hari 0.0520 -
Sewa Tripot/Tackel & handle
crane 2 T hari 0.1150 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.77 Pemasangan 1 m pipa baja Ø 1000 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 4.8950 #REF! #REF!
Tukang pipa L.0.02 OH 0.9790 -
Mandor L.0.04 OH 0.4890 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
kap 0,5 -1,0 m3 hari 0.0580 -
Sewa Tripot/Tackel & handle
crane 2 T hari 0.1330 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.78 Pemasangan 1 m pipa baja Ø 1100 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 5.3870 #REF! #REF!
Tukang pipa L.0.02 OH 1.0770 -
Mandor L.0.04 OH 0.5390 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
kap 0,5 -1,0 m3 hari 0.0640 -
Sewa Tripot/Tackel & handle
hari 0.1500 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.1.79 Pemasangan 1 m pipa baja Ø 1200 mm


Harga Sat uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 5.8970 #REF! #REF!
Tukang pipa L.0.02 OH 1.1760 -
Mandor L.0.04 OH 0.5880 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
kap 0,5 -1,0 m3 hari 0.0700 -
Sewa Tripot/Tackel & handle
crane 2 T hari 0.1670 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA
A.8.4.2.1 Pemotongan 1 buah pipa PVC Ø 63 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0050 #REF! #REF!
Tukang pipa L.0.02 OH 0.0020 -
Mandor L.0.04 OH 0.0005 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 63 mm bh 1.0000 -
JUMLAH HARGA BAHAN 0
C PERALATAN
Peralatan potong pipa
hari 0.0030 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.2 Pemotongan 1 m pipa PVC Ø 90 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0140 #REF! #REF!
Tukang pipa L.0.02 OH 0.0140 -
Mandor L.0.04 OH 0.0010 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 90 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0030 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.3 Pemotongan 1 buah pipa PVC Ø 110 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0220 #REF! #REF!
Tukang pipa L.0.02 OH 0.0110 -
Mandor L.0.04 OH 0.0020 #REF! #REF!

Hal 18/172
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 110 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0030 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.4 Pemotongan 1 buah pipa PVC Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0310 #REF! #REF!
Tukang pipa L.0.02 OH 0.0150 -
Mandor L.0.04 OH 0.0030 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0030 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.5 Pemotongan 1 buah pipa PVC Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0810 #REF! #REF!
Tukang pipa L.0.02 OH 0.0400 -
Mandor L.0.04 OH 0.0080 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0170 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!

Hal 19/172
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.6 Pemotongan 1 buah pipa PVC Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1280 #REF! #REF!
Tukang pipa L.0.02 OH 0.0640 -
Mandor L.0.04 OH 0.0130 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0300 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.7 Pemotongan 1 buah pipa PVC Ø 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1550 #REF! #REF!
Tukang pipa L.0.02 OH 0.0770 -
Mandor L.0.04 OH 0.0150 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0370 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.8 Pemotongan 1 buah pipa PVC Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3310 #REF! #REF!
Tukang pipa L.0.02 OH 0.1660 -
Mandor L.0.04 OH 0.0330 #REF! #REF!
JUMLAH TENAGA KERJA #REF!

Hal 20/172
B BAHAN
Pipa PVC Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0860 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.9 Pemotongan 1 buah pipa PVC Ø 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4200 #REF! #REF!
Tukang pipa L.0.02 OH 0.2100 -
Mandor L.0.04 OH 0.0420 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0540 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.10 Pemotongan 1 buah pipa PVC Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5180 #REF! #REF!
Tukang pipa L.0.02 OH 0.2590 -
Mandor L.0.04 OH 0.0520 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0690 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Hal 21/172
A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6230 #REF! #REF!
Tukang pipa L.0.02 OH 0.3110 -
Mandor L.0.04 OH 0.0620 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0860 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.12 Pemotongan 1 buah pipa PVC Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.0890 #REF! #REF!
Tukang pipa L.0.02 OH 0.5450 -
Mandor L.0.04 OH 0.1090 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1600 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.13 Pemotongan 1 buah pipa PVC Ø 900 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.1410 #REF! #REF!
Tukang pipa L.0.02 OH 0.5710 -
Mandor L.0.04 OH 0.1140 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 900 mm bh 1.0000 -

Hal 22/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1680 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.14 Pemotongan 1 buah pipa PVC Ø 1000 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2850 #REF! #REF!
Tukang pipa L.0.02 OH 0.6430 -
Mandor L.0.04 OH 0.1290 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1910 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.15 Pemotongan 1 buah pipa PVC Ø 1100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4290 #REF! #REF!
Tukang pipa L.0.02 OH 0.7150 -
Mandor L.0.04 OH 0.1430 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.2130 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.16 Pemotongan 1 buah pipa PVC Ø 1200 mm

Hal 23/172
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5730 #REF! #REF!
Tukang pipa L.0.02 OH 0.7870 -
Mandor L.0.04 OH 0.1570 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.2360 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.17 Pemotongan 1 buah pipa HDPE Ø 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0020 #REF! #REF!
Tukang pipa L.0.02 OH 0.0010 -
Mandor L.0.04 OH 0.0002 #REF! #REF!
Operator L.0.08 OH 0.0340 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 63 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0040 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.18 Pemotongan 1 buah pipa HDPE Ø 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0060 #REF! #REF!
Tukang pipa L.0.02 OH 0.0030 -
Mandor L.0.04 OH 0.0010 #REF! #REF!
Operator L.0.08 OH 0.0710 -
JUMLAH TENAGA KERJA #REF!

Hal 24/172
B BAHAN
Pipa HDPE Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0050 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.19 Pemotongan 1 buah pipa HDPE Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0090 #REF! #REF!
Tukang pipa L.0.02 OH 0.0050 -
Mandor L.0.04 OH 0.0010 #REF! #REF!
Operator L.0.08 OH 0.0960 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0060 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.20 Pemotongan 1 buah pipa HDPE Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0160 #REF! #REF!
Tukang pipa L.0.02 OH 0.0080 -
Mandor L.0.04 OH 0.0020 #REF! #REF!
Operator L.0.08 OH 0.1210 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0090 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

Hal 25/172
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.21 Pemotongan 1 buah pipa HDPE Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0440 #REF! #REF!
Tukang pipa L.0.02 OH 0.0220 -
Mandor L.0.04 OH 0.0040 #REF! #REF!
Operator L.0.08 OH 0.1710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0170 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.22 Pemotongan 1 buah pipaHDPE Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0670 #REF! #REF!
Tukang pipa L.0.02 OH 0.0330 -
Mandor L.0.04 OH 0.0070 #REF! #REF!
Operator L.0.08 OH 0.2210 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0230 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.23 Pemotongan 1 buah pipa HDPE Ø 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Hal 26/172
A TENAGA
Pekerja L.0.01 OH 0.0900 #REF! #REF!
Tukang pipa L.0.02 OH 0.0450 -
Mandor L.0.04 OH 0.0090 #REF! #REF!
Operator L.0.08 OH 0.2710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0300 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.24 Pemotongan 1 buah pipa HDPE Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1770 #REF! #REF!
Tukang pipa L.0.02 OH 0.0880 -
Mandor L.0.04 OH 0.0180 #REF! #REF!
Operator L.0.08 OH 0.3710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0550 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.25 Pemotongan 1 buah pipa HDPE Ø 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2250 #REF! #REF!
Tukang pipa L.0.02 OH 0.1130 -
Mandor L.0.04 OH 0.0230 #REF! #REF!
Operator L.0.08 OH 0.4210 -
JUMLAH TENAGA KERJA #REF!
B BAHAN

Hal 27/172
Pipa HDPE Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0700 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.26 Pemotongan 1 buah pipa HDPE Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.2770 #REF! #REF!
Tukang pipa L.0.02 OH 0.1390 -
Mandor L.0.04 OH 0.0280 #REF! #REF!
Operator L.0.08 OH 0.4710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0850 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.27 Pemotongan 1 buah pipa HDPE Ø 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3330 #REF! #REF!
Tukang pipa L.0.02 OH 0.1670 -
Mandor L.0.04 OH 0.0330 #REF! #REF!
Operator L.0.08 OH 0.5710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1010 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!

Hal 28/172
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.28 Pemotongan 1 buah pipa HDPE Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6010 #REF! #REF!
Tukang pipa L.0.02 OH 0.3010 -
Mandor L.0.04 OH 0.0600 #REF! #REF!
Operator L.0.08 OH 0.7710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1790 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.29 Pemotongan 1 buah pipa HDPE Ø 900 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9130 #REF! #REF!
Tukang pipa L.0.02 OH 0.4560 -
Mandor L.0.04 OH 0.0910 #REF! #REF!
Operator L.0.08 OH 0.8710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.2700 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.30 Pemotongan 1 buah pipa HDPE Ø 1000 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Hal 29/172
Pekerja L.0.01 OH 1.1250 #REF! #REF!
Tukang pipa L.0.02 OH 0.5620 -
Mandor L.0.04 OH 0.1120 #REF! #REF!
Operator L.0.08 OH 0.9710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.3320 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.31 Pemotongan 1 buah pipa HDPE Ø 1100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.2380 #REF! #REF!
Tukang pipa L.0.02 OH 0.6190 -
Mandor L.0.04 OH 0.1240 #REF! #REF!
Operator L.0.08 OH 1.0710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.3650 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.32 Pemotongan 1 buah pipa HDPE Ø 1200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6190 #REF! #REF!
Tukang pipa L.0.02 OH 0.8090 -
Mandor L.0.04 OH 0.1620 #REF! #REF!
Operator L.0.08 OH 1.1710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1200 mm bh 1.0000 -

Hal 30/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.4770 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.33 Pemotongan 1 buah pipa GIP Ø 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0190 #REF! #REF!
Tukang pipa L.0.02 OH 0.0100 -
Mandor L.0.04 OH 0.0020 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 63 mm bh 1.0000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.34 Pemotongan 1 buah pipa GIP Ø 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0580 #REF! #REF!
Tukang pipa L.0.02 OH 0.0290 -
Mandor L.0.04 OH 0.0060 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!

Hal 31/172
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.35 Pemotongan 1 buah pipa GIP Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0920 #REF! #REF!
Tukang pipa L.0.02 OH 0.0460 -
Mandor L.0.04 OH 0.0090 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.36 Pemotongan 1 buah pipa GIP Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1310 #REF! #REF!
Tukang pipa L.0.02 OH 0.0660 -
Mandor L.0.04 OH 0.0130 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.37 Pemotongan 1 buah pipa GIP Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Hal 32/172
Pekerja L.0.01 OH 0.3400 #REF! #REF!
Tukang pipa L.0.02 OH 0.1700 -
Mandor L.0.04 OH 0.0340 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.38 Pemotongan 1 buah pipa GIP Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4750 #REF! #REF!
Tukang pipa L.0.02 OH 0.2370 -
Mandor L.0.04 OH 0.0470 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.39 Pemotongan 1 buah pipa GIP Ø 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5040 #REF! #REF!
Tukang pipa L.0.02 OH 0.2520 -
Mandor L.0.04 OH 0.0500 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -

Hal 33/172
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.40 Pemotongan 1 buah pipa GIP Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7380 #REF! #REF!
Tukang pipa L.0.02 OH 0.3690 -
Mandor L.0.04 OH 0.0740 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.41 Pemotongan 1 buah pipa GIP Ø 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8480 #REF! #REF!
Tukang pipa L.0.02 OH 0.4240 -
Mandor L.0.04 OH 0.0850 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Hal 34/172
A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9410 #REF! #REF!
Tukang pipa L.0.02 OH 0.4710 -
Mandor L.0.04 OH 0.0940 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.43 Pemotongan1 buah pipa GIP Ø 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.8640 #REF! #REF!
Tukang pipa L.0.02 OH 0.4320 -
Mandor L.0.04 OH 0.0860 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.44 Pemotongan 1 buah pipa GIP Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5670 #REF! #REF!

Hal 35/172
Tukang pipa L.0.02 OH 0.7830 -
Mandor L.0.04 OH 0.1570 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.45 Pemotongan 1 buah pipa GIP Ø 900 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7700 #REF! #REF!
Tukang pipa L.0.02 OH 0.8850 -
Mandor L.0.04 OH 0.1770 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.46 Pemotongan 1 buah pipa GIP Ø 1000 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.9740 #REF! #REF!
Tukang pipa L.0.02 OH 0.9870 -
Mandor L.0.04 OH 0.1970 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN

Hal 36/172
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.47 Pemotongan 1 buah pipa GIP Ø 1100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.1780 #REF! #REF!
Tukang pipa L.0.02 OH 1.0890 -
Mandor L.0.04 OH 0.2180 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.48 Pemotongan 1 buah pipa GIP Ø 1200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.3820 #REF! #REF!
Tukang pipa L.0.02 OH 1.1910 -
Mandor L.0.04 OH 0.2380 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa GIP Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Hal 37/172
A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0710 #REF! #REF!
Tukang pipa L.0.02 OH 0.0140 -
Mandor L.0.04 OH 0.0070 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0030
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.50 Pemotongan 1 buah pipa DCI Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1120 #REF! #REF!
Tukang pipa L.0.02 OH 0.0220 -
Mandor L.0.04 OH 0.0110 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0100 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.51 Pemotongan 1 buah pipa DCI Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1590 #REF! #REF!

Hal 38/172
Tukang pipa L.0.02 OH 0.0320 -
Mandor L.0.04 OH 0.0160 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0180 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.52 Pemotongan 1 buah pipa DCI Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.3660 #REF! #REF!
Tukang pipa L.0.02 OH 0.0730 -
Mandor L.0.04 OH 0.0370 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0540 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.53 Pemotongan 1 buah pipa DCI Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4760 #REF! #REF!
Tukang pipa L.0.02 OH 0.0950 -
Mandor L.0.04 OH 0.0480 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -

Hal 39/172
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0730 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.54 Pemotongan 1 buah pipa DCI Ø 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.5120 #REF! #REF!
Tukang pipa L.0.02 OH 0.1020 -
Mandor L.0.04 OH 0.0510 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0790 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.55 Pemotongan 1 buah pipa DCI Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9410 #REF! #REF!
Tukang pipa L.0.02 OH 0.1880 -
Mandor L.0.04 OH 0.0940 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1580 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!

Hal 40/172
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.56 Pemotongan 1 buah pipa DCI Ø 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.1370 #REF! #REF!
Tukang pipa L.0.02 OH 0.2270 -
Mandor L.0.04 OH 0.1140 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1760 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.57 Pemotongan 1 buah pipa DCI Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3120 #REF! #REF!
Tukang pipa L.0.02 OH 0.2620 -
Mandor L.0.04 OH 0.1310 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1920 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.58 Pemotongan 1 buah pipa DCI Ø 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA

Hal 41/172
Pekerja L.0.01 OH 1.3090 #REF! #REF!
Tukang pipa L.0.02 OH 0.2620 -
Mandor L.0.04 OH 0.1310 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1920 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.59 Pemotongan 1 buah pipa DCI Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.5980 #REF! #REF!
Tukang pipa L.0.02 OH 0.5200 -
Mandor L.0.04 OH 0.2600 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.3100 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.60 Pemotongan 1 buah pipa DCI Ø 900 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.3700 #REF! #REF!
Tukang pipa L.0.02 OH 0.6740 -
Mandor L.0.04 OH 0.3370 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 900 mm bh 1.0000 -

Hal 42/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.3810 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.61 Pemotongan 1 buah pipa DCI Ø 1000 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.0210 #REF! #REF!
Tukang pipa L.0.02 OH 0.8040 -
Mandor L.0.04 OH 0.4020 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.4410 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.62 Pemotongan 1 buah pipa DCI Ø 1100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.7310 #REF! #REF!
Tukang pipa L.0.02 OH 0.9460 -
Mandor L.0.04 OH 0.4730 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.5060 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!

Hal 43/172
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.63 Pemotongan 1 buah pipa DCI Ø 1200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.5020 #REF! #REF!
Tukang pipa L.0.02 OH 1.1000 -
Mandor L.0.04 OH 0.5500 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa DCI Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.5760 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.64 Pemotongan 1 buah pipa baja Ø 63 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0280 #REF! #REF!
Tukang pipa L.0.02 OH 0.0060 -
Mandor L.0.04 OH 0.0030 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 63 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0370 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.65 Pemotongan 1 buah pipa baja Ø 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)

Hal 44/172
A TENAGA
Pekerja L.0.01 OH 0.0850 #REF! #REF!
Tukang pipa L.0.02 OH 0.0170 -
Mandor L.0.04 OH 0.0080 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0400 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.66 Pemotongan 1 buah pipa baja Ø 125 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1330 #REF! #REF!
Tukang pipa L.0.02 OH 0.0270 -
Mandor L.0.04 OH 0.0130 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 125 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0420 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.67 Pemotongan 1 buah pipa baja Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1840 #REF! #REF!
Tukang pipa L.0.02 OH 0.0370 -
Mandor L.0.04 OH 0.0180 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 150 mm bh 1.0000 -

Hal 45/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0450 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.68 Pemotongan 1 buah pipa baja Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.4760 #REF! #REF!
Tukang pipa L.0.02 OH 0.0950 -
Mandor L.0.04 OH 0.0480 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0600 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.69 Pemotongan 1 buah pipa baja Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6630 #REF! #REF!
Tukang pipa L.0.02 OH 0.1330 -
Mandor L.0.04 OH 0.0660 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0680 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

Hal 46/172
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.70 Pemotongan 1 buah pipa baja Ø 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.7450 #REF! #REF!
Tukang pipa L.0.02 OH 0.1490 -
Mandor L.0.04 OH 0.0740 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0720 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.71 Pemotongan 1 buah pipa baja Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4400 #REF! #REF!
Tukang pipa L.0.02 OH 0.2880 -
Mandor L.0.04 OH 0.1440 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1050 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.72 Pemotongan 1 buah pipa baja Ø 450 mm

Hal 47/172
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3990 #REF! #REF!
Tukang pipa L.0.02 OH 0.2800 -
Mandor L.0.04 OH 0.1400 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1070 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.73 Pemotongan 1 buah pipa baja Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5580 #REF! #REF!
Tukang pipa L.0.02 OH 0.3120 -
Mandor L.0.04 OH 0.1560 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1070 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.74 Pemotongan 1 buah pipa baja Ø 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4370 #REF! #REF!
Tukang pipa L.0.02 OH 0.2870 -
Mandor L.0.04 OH 0.1440 #REF! #REF!

Hal 48/172
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1130 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.75 Pemotongan 1 buah pipa baja Ø 800 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.6240 #REF! #REF!
Tukang pipa L.0.02 OH 0.5250 -
Mandor L.0.04 OH 0.2620 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1660 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.76 Pemotongan 1 buah pipa baja Ø 900 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.9710 #REF! #REF!
Tukang pipa L.0.02 OH 0.5940 -
Mandor L.0.04 OH 0.2970 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1830 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

Hal 49/172
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.77 Pemotongan 1 buah pipa baja Ø 1000 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.3190 #REF! #REF!
Tukang pipa L.0.02 OH 0.6640 -
Mandor L.0.04 OH 0.3320 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa -
hari 0.2010
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.78 Pemotongan 1 buah pipa baja Ø 1100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.6670 #REF! #REF!
Tukang pipa L.0.02 OH 0.7330 -
Mandor L.0.04 OH 0.3670 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa -
hari 0.2180
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.2.79 Pemotongan 1 buah pipa baja Ø 1200 mm

Hal 50/172
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.0150 #REF! #REF!
Tukang pipa L.0.02 OH 0.8030 -
Mandor L.0.04 OH 0.4020 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Baja Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa -
hari 0.2360
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

Hal 51/172
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm
Harga S at uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 1.4290 #REF! #REF!
Tukang pipa L.0.02 OH 0.7150 -
Mandor L.0.04 OH 0.1430 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.1000 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.2 Pemasangan 1 buah Valve Ø 200 mm


Harga S at uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 1.7140 #REF! #REF!
Tukang pipa L.0.02 OH 0.8570 -
Mandor L.0.04 OH 0.1710 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3000 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.3 Pemasangan 1 buah Valve Ø 250 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.7140 #REF! #REF!
Tukang pipa L.0.02 OH 0.8570 -
Mandor L.0.04 OH 0.1710 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle -
hari 0.4000
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.4 Pemasangan 1 buah Valve Ø 300 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.0000 #REF! #REF!
Tukang pipa L.0.02 OH 1.0000 -
Mandor L.0.04 OH 0.2000 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.5000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!

F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.5 Pemasangan 1 buah Valve Ø 400 mm


Harga S at uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 3.4290 #REF! #REF!
Tukang pipa L.0.02 OH 1.7150 -
Mandor L.0.04 OH 0.3430 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 1.0000 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.6 Pemasangan 1 buah Valve Ø 450 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 3.4290 #REF! #REF!
Tukang pipa L.0.02 OH 1.7150 -
Mandor L.0.04 OH 0.3430 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle -
hari 1.0000
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.7 Pemasangan 1 buah Valve Ø 500 mm


Harga S at uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 4.0000 #REF! #REF!
Tukang pipa L.0.02 OH 2.0000 -
Mandor L.0.04 OH 0.4000 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari 1.0000
crane 2 T -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.8 Pemasangan 1 buah Valve Ø 600 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.4210 #REF! #REF!
Tukang pipa L.0.02 OH 0.7110 -
Mandor L.0.04 OH 0.1420 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle -
crane 2 T hari 0.6000

Mobil e crane =< 3 ton hari 0.3000 -


JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.9 Pemasangan 1 buah Valve Ø 700 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.4290 #REF! #REF!
Tukang pipa L.0.02 OH 0.7150 -
Mandor L.0.04 OH 0.1430 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 700 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle -
hari 0.5000
crane 2 T
Mobil e crane =< 3 ton hari 0.5000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.10 Pemasangan 1 buah Valve Ø 800 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.7860 #REF! #REF!
Tukang pipa L.0.02 OH 0.8930 -
Mandor L.0.04 OH 0.1790 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle -
crane 2 T hari 0.5000
Mobil e crane =< 3 ton hari 0.5000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.11 Pemasangan 1 buah Valve Ø 900 mm

No Uraian Kode Satuan Koefisien Harga S at uan Jumlah Harga (Rp)


(Rp)
A TENAGA
Pekerja L.0.01 OH 1.7140 #REF! #REF!
Tukang pipa L.0.02 OH 0.8570 -
Mandor L.0.04 OH 0.1710 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle -
crane 2 T hari 0.7500
Mobil e crane =< 3 ton hari 0.7500 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.12 Pemasangan 1 buah Valve Ø 1000 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.5710 #REF! #REF!
Tukang pipa L.0.02 OH 1.2860 -
Mandor L.0.04 OH 0.2570 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 1.0000 -
crane 2 T
Mobil e crane =< 3 ton hari 1.0000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.13 Pemasangan 1 buah Valve Ø 1100 mm

No Uraian Kode Satuan Koefisien Harga S at uan Jumlah Harga (Rp)


(Rp)
A TENAGA
Pekerja L.0.01 OH 3.0000 #REF! #REF!
Tukang pipa L.0.02 OH 1.5000 -
Mandor L.0.04 OH 0.3000 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 1.0000 -
Mobil e crane =< 3 ton hari 1.0000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.14 Pemasangan 1 buah Valve Ø 1200 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 3.0000 #REF! #REF!
Tukang pipa L.0.02 OH 1.5000 -
Mandor L.0.04 OH 0.3000 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Valve Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle -
crane 2 T hari 1.0000
Mobil e crane =< 3 ton hari 1.0000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.15 Pemasangan 1 buah Tee Ø 150 mm


Harga S at uan Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien (Rp)
A TENAGA
Pekerja L.0.01 OH 0.1060 #REF! #REF!
Tukang pipa L.0.02 OH 0.0530 -
Mandor L.0.04 OH 0.0110 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0280 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.16 Pemasangan 1 buah Tee Ø 200 mm


Harga S at uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 0.2160 #REF! #REF!
Tukang pipa L.0.02 OH 0.1080 -
Mandor L.0.04 OH 0.0220 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0290 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.17 Pemasangan 1 buah Tee Ø 250 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.3260 #REF! #REF!
Tukang pipa L.0.02 OH 0.1630 -
Mandor L.0.04 OH 0.0330 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0390 -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.18 Pemasangan 1 buah Tee Ø 300 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.4360 #REF! #REF!
Tukang pipa L.0.02 OH 0.2180 -
Mandor L.0.04 OH 0.0440 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.5000 -

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.19 Pemasangan 1 buah Tee Ø 400 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.6560 #REF! #REF!
Tukang pipa L.0.02 OH 0.3280 -
Mandor L.0.04 OH 0.0660 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.5000 -
crane 2 T

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.20 Pemasangan 1 buah Tee Ø 450 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.7660 #REF! #REF!
Tukang pipa L.0.02 OH 0.3830 -
Mandor L.0.04 OH 0.0770 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.5000 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.21 Pemasangan 1 buah Tee Ø 500 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.8760 #REF! #REF!
Tukang pipa L.0.02 OH 0.4380 -
Mandor L.0.04 OH 0.0880 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.6000 -
crane 2 T

JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.22 Pemasangan 1 buah Tee Ø 600 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.0960 #REF! #REF!
Tukang pipa L.0.02 OH 0.5480 -
Mandor L.0.04 OH 0.1100 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.1930 -
crane 2 T
Mobile crane =< 3 ton hari 0.0960 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.23 Pemasangan 1 buah Tee Ø 700 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.3160 #REF! #REF!
Tukang pipa L.0.02 OH 0.6580 -
Mandor L.0.04 OH 0.6580 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 700 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.2250 -
Mobile crane =< 3 ton hari 0.1130 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.24 Pemasangan 1 buah Tee Ø 800 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.5360 #REF! #REF!
Tukang pipa L.0.02 OH 0.7680 -
Mandor L.0.04 OH 0.1540 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.2570 -
Mobil e crane =< 3 ton hari 0.1290 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.25 Pemasangan 1 buah Tee Ø 900 mm


Harga S at uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja L.0.01 OH 1.7560 #REF! #REF!
Tukang pipa L.0.02 OH 0.8780 -
Mandor L.0.04 OH 0.1760 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 900 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3210 -
crane 2 T
Mobile crane =< 3 ton hari 0.1610 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.26 Pemasangan 1 buah Tee Ø 1000 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.9760 #REF! #REF!
Tukang pipa L.0.02 OH 0.9880 -
Mandor L.0.04 OH 0.1980 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3660 -
crane 2 T
Mobil e crane =< 3 ton hari 0.1830 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.27 Pemasangan 1 buah Tee Ø 1100 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.1960 #REF! #REF!
Tukang pipa L.0.02 OH 1.0980 -
Mandor L.0.04 OH 0.2200 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 1100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3860 -
crane 2 T
Mobil e crane =< 3 ton hari 0.1930 -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.3.28 Pemasangan 1 buah Tee Ø 1200 mm


Harga S at uan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.4160 #REF! #REF!
Tukang pipa L.0.02 OH 1.2080 -

Mandor L.0.04 OH 0.2420 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Tee Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.4500 -
Mobil e crane =< 3 ton hari 0.2250 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA
A.8.4.4.1 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 80 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4660 #REF! #REF!
Tukang pipa L.0.02 OH 0.7330 -
Mandor L.0.04 OH 0.1470 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 80 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.6060 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 0.0750 -
Sewa Pompa Submersible
hari 0.9680 -
3m 3 /hTripot/Tackel & handle
Sewa
hari 0.8650 -
crane 2 T
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) #REF!


E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.2 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.6460 #REF! #REF!
Tukang pipa L.0.02 OH 0.8230 -
Mandor L.0.04 OH 0.1650 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.6500 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 0.1590 -
Sewa Pompa Submersible
hari 1.0780 -
3m 3 /hTripot/Tackel & handle
Sewa
hari 0.9110 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.3 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.0960 #REF! #REF!
Tukang pipa L.0.02 OH 1.0480 -
Mandor L.0.04 OH 0.2100 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Ø 150 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.7600 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 0.3690 -
Sewa Pompa Submersible
hari 1.3530 -
3m 3 /h
Sewa Tripot/Tackel & handle
hari 1.0260 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.4 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.5460 #REF! #REF!
Tukang pipa L.0.02 OH 1.2730 -
Mandor L.0.04 OH 0.2550 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.8700 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 0.5790 -

Sewa Pompa Submersible


hari 1.6280 -
3m 3 /h
Sewa Tripot/Tackel & handle
hari 1.1410 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.5 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 2.9960 #REF! #REF!
Tukang pipa L.0.02 OH 1.4980 -
Mandor L.0.04 OH 0.3000 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Ø 250 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.9800 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 0.7890 -
Sewa Pompa Submersible
hari 1.9030 -
3m 3 /h

Sewa Tripot/Tackel & handle


hari 1.2560 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.6 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 3.4460 #REF! #REF!
Tukang pipa L.0.02 OH 1.7230 -
Mandor L.0.04 OH 0.3450 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 1.0900 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 0.9990 -
Sewa Pompa Submersible
hari 2.1780 -
3m 3 /h
Sewa Tripot/Tackel & handle
hari 1.3710 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.7 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.3460 #REF! #REF!
Tukang pipa L.0.02 OH 2.1730 -
Mandor L.0.04 OH 0.4350 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 1.3100 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 1.4190 -
Sewa Pompa Submersible
hari 2.7280 -
3m 3 /hTripot/Tackel & handle
Sewa
hari 1.6010 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.8 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.7960 #REF! #REF!
Tukang pipa L.0.02 OH 2.3980 -
Mandor L.0.04 OH 0.4800 #REF! #REF!

JUMLAH TENAGA KERJA #REF!


B BAHAN
Pipa Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 1.4200 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 1.6290 -
Sewa Pom pa Submersible
hari 3.0030 -
3m 3 /hTripot/Tackel & handle
Sewa
hari 1.7160 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.9 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 5.2460 #REF! #REF!
Tukang pipa L.0.02 OH 2.6230 -
Mandor L.0.04 OH 0.5250 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 500 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 1.5300 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 1.8390 -
Sewa Pompa Submersible
hari 3.2780 -
3m 3 /hTripot/Tackel & handle
Sewa
hari 1.8310 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.10 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 6.1460 #REF! #REF!
Tukang pipa L.0.02 OH 3.0730 -
Mandor L.0.04 OH 0.6150 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 1.7500 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 2.2590 -
Sewa Pompa Submersible
hari 3.8280 -
3m 3 /h
Sewa Tripot/Tackel & handle
hari 2.0610 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.11 Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 7.0460 #REF! #REF!
Tukang pipa L.0.02 OH 3.5230 -
Mandor L.0.04 OH 0.7050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 700 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 1.9700 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 2.6790 -
Sewa Pompa Submersible
hari 4.3780 -
3m 3 /h
Sewa Tripot/Tackel & handle
hari 2.2910 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.4.12 Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 7.9460 #REF! #REF!
Tukang pipa L.0.02 OH 3.9730 -
Mandor L.0.04 OH 0.7950 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 2.1900 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 3.0990 -
Sewa Pompa Submersible
hari 4.9280 -
3m 3 /hTripot/Tackel & handle
Sewa
hari 2.5210 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA
A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0020 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.2 Pengetesan 1 m pipa Ø 75 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0040 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.3 Pengetesan 1 m pipa Ø 100 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0080 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.4 Pengetesan 1 m pipa Ø 150 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0180 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.5 Pengetesan 1 m pipa Ø 200 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0310 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.6 Pengetesan 1 m pipa Ø 250 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0490 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.7 Pengetesan 1 m pipa Ø 300 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0710 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.8 Pengetesan 1 m pipa Ø 400 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.1260 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.9 Pengetesan 1 m pipa Ø 500 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.1580 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!

A.8.4.5.10 Pengetesan 1 m pipa Ø 600 mm


Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.2830 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!

JUMLAH HARGA BAHAN #REF!


C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
RENCANA ANGGARAN BIAYA (RAB)

REKAPITULASI

PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG


SUB PEKERJAAN : MEKANIKAL, ELEKTRIKAL & PLUMBING
LOKASI :
TH. ANGGARAN :

NO URAIAN PEKERJAAN JUMLAH HARGA


01 02 03

C PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING


I PEKERJAAN PENYAMBUNGAN LISTRIK Rp 312,048,000.00
II PEKERJAAN MDP DAN SDP Rp 351,815,004.00
III PEKERJAAN PANEL Rp 1,015,170,164.00
IV PEKERJAAN PENERANGAN Rp 134,050,527.33
V PEKERJAAN TATA UDARA Rp 1,841,988,606.94
VI PEKERJAAN PLUMBING Rp 392,861,451.22
VII PEKERJAAN TELEPHONE & LAN Rp 41,678,000.00
VIII PEKERJAAN INSTALASI CCTV Rp 43,885,950.00
IX PEKERJAAN INSTALASI TATA SUARA Rp 79,833,250.00
X PEKERJAAN FIRE ALARM & FIRE EXTINGUSHER Rp 38,915,950.00
XI PEKERJAAN LIFT Rp 480,000,000.00
XII PEKERJAAN GAS MEDIS Rp 472,021,738.00
XIII PEKERJAAN PENANGKAL PETIR Rp 61,000,000.00

JUMLAH Rp 5,265,268,641.49
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG


SUB PEKERJAAN : MEKANIKAL, ELEKTRIKAL & PLUMBING
LOKASI :
TH. ANGGARAN :

NO URAIAN PEKERJAAN VOLUME KODE HARGA SATUAN JUMLAH HARGA


01 02 03 04 05 06

C PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING


I PEKERJAAN PENYAMBUNGAN LISTRIK
Biaya Pasang Baru BP-UJL (Biaya resmi) 197 KVA 2.00 ls Taksir 156,024,000.00 312,048,000.00
Catatan : Scope pekerjaan sudah termasuk Pengadaan Jaringan TM,
tiang distribusi, trafo distribusi, biaya perijinan, SLO, gambar,
hingga kondisi nyala & KWH meter terpasang.
Sub Jumlah 312,048,000.00

II PEKERJAAN MDP DAN SDP


1 - MDP (Lantai 01)
* Panel 80 x 180 x 80 + busbar, pengkabelan, aksesoris ( Terpasang ) 3.00 unit Taksir 17,280,000.00 51,840,000.00
* MCCB 25 A / 10 KA, 3P 3.00 bh Taksir 638,000.00 1,914,000.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* MCCB 60 A / 10 KA, 3P 2.00 bh Taksir 705,650.00 1,411,300.00
* MCCB 200 A / 25 KA, 3P 2.00 bh Taksir 1,908,500.00 3,817,000.00
* MCCB 350 A / 36 KA, 3P 1.00 bh Taksir 3,437,000.00 3,437,000.00
* MCCB 400 A / 36 KA, 4P (motorized) 2.00 bh Taksir 13,146,000.00 26,292,000.00
* Pilot lamp 6.00 bh Taksir 55,450.00 332,700.00
* Selector Switch Voltage 2.00 bh Taksir 507,400.00 1,014,800.00
* Fuse 6A + holder 6.00 bh Taksir 50,000.00 300,000.00
* Volt meter 2.00 bh Taksir 452,100.00 904,200.00
* Ampere meter 6.00 bh Taksir 490,600.00 2,943,600.00
* CT 400/5 A 6.00 bh Taksir 437,250.00 2,623,500.00
* ATS / AMF control module 1.00 bh Taksir 15,000,000.00 15,000,000.00
* Surge Arrester PF40, 3P + N 1.00 bh Taksir 1,580,700.00 1,580,700.00
* Arde BCC 95 mm2 max. 2 ohm 10.00 m' Taksir 106,066.80 1,060,668.00
* Kabel NYY 4 x 1 x 185 mm2 dari KWH PLN 30.00 m' Taksir 904,752.00 27,142,560.00
* Kabel NYY 4 x 1 x 185 mm2 dari Genset Eksisting 100.00 m' Taksir 904,752.00 90,475,200.00
* Grounding lengkap bak kontrol dan elektroda pentanahan max 2 ohm 1.00 lot Taksir 5,000,000.00 5,000,000.00

2 - Kapasitor Bank
* Capasitor Bank Easy Can 12,5 kVAR 8.00 bh Taksir 1,734,000.00 13,872,000.00
* Power Factor Regulator 8 Step 1.00 bh Taksir 4,614,000.00 4,614,000.00
* Contactor 40 A (Khusus Capasitor Bank) 8.00 bh Taksir 1,192,000.00 9,536,000.00
* Manual Push Button ON-OFF 16.00 bh Taksir 99,150.00 1,586,400.00
* MCCB 40 A / 10 KA, 3P 8.00 bh Taksir 638,000.00 5,104,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* Cos phi meter 1.00 bh Taksir 400,000.00 400,000.00
* CT 200/5 A 3.00 bh Taksir 339,000.00 1,017,000.00
* Kabel NYY 4 x 1 x 70 mm2 dari MDP 5.00 m' Taksir 363,384.00 1,816,920.00
3 - SDP Penerangan (Lantai 01)
* Panel 80 x 120 x 30 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 17,280,000.00 17,280,000.00
* MCCB 25 A / 10 KA, 3P 2.00 bh Taksir 638,000.00 1,276,000.00
* MCCB 40 A / 10 KA, 3P 6.00 bh Taksir 638,000.00 3,828,000.00
* MCCB 80 A / 10 KA, 3P 1.00 bh Taksir 705,650.00 705,650.00
* MCCB 200 A / 25 KA, 3P 1.00 bh Taksir 1,908,500.00 1,908,500.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 200/5 A 3.00 bh Taksir 339,000.00 1,017,000.00
* Surge Arrester PF40, 3P + N 1.00 bh Taksir 1,580,700.00 1,580,700.00
* Arde BCC 35 mm2 max. 2 ohm 15.00 m' Taksir 39,069.60 586,044.00
* Kabel NYY 4 x 1 x 70 mm2 dari MDP 15.00 m' Taksir 363,384.00 5,450,760.00

4 - SDP AC (Lantai 01)


* Panel 80 x 120 x 30 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 17,280,000.00 17,280,000.00
* MCCB 25 A / 10 KA, 3P 2.00 bh Taksir 638,000.00 1,276,000.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* MCCB 60 A / 10 KA, 3P 2.00 bh Taksir 705,650.00 1,411,300.00
* MCCB 250 A / 36 KA, 3P 1.00 bh Taksir 1,908,500.00 1,908,500.00
* MCCB 350 A / 36 KA, 3P 1.00 bh Taksir 3,437,000.00 3,437,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 400/5 A 3.00 bh Taksir 437,250.00 1,311,750.00
* Surge Arrester PF40, 3P + N 1.00 bh Taksir 1,580,700.00 1,580,700.00
* Arde BCC 95 mm2 max. 2 ohm 15.00 m' Taksir 106,066.80 1,591,002.00
* Kabel NYY 4 x 1 x 150 mm2 dari MDP 5.00 m' Taksir 766,320.00 3,831,600.00
Sub Jumlah 351,815,004.00

III PEKERJAAN PANEL


1 PEKERJAAN PANEL PENERANGAN & STOP KONTAK
PANEL PENERANGAN & STOP KONTAK- LANTAI 01 (PPS-LT.01)
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 6 A / 6 KA, 1P 4.00 bh Taksir 94,600.00 378,400.00
* MCB 10 A / 6 KA, 1P 17.00 bh Taksir 94,600.00 1,608,200.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 10 mm2 max. 2 ohm 15.00 m' Taksir 10,939.20 164,088.00
* Kabel NYY 4 x 10 mm2 dari SDP Penerangan 15.00 m' Taksir 65,989.20 989,838.00
PANEL PENERANGAN & STOP KONTAK- LANTAI 02 (PPS-LT.02)
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 6 A / 6 KA, 1P 5.00 bh Taksir 94,600.00 473,000.00
* MCB 10 A / 6 KA, 1P 16.00 bh Taksir 94,600.00 1,513,600.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 10 mm2 max. 2 ohm 20.00 m' Taksir 10,939.20 218,784.00
* Kabel NYY 4 x 10 mm2 dari SDP Penerangan 20.00 m' Taksir 65,989.20 1,319,784.00

PANEL STOP KONTAK ICU- LANTAI 02 (PS.ICU-LT.02)


* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 10 A / 6 KA, 1P 27.00 bh Taksir 94,600.00 2,554,200.00
* MCCB 80 A / 18 KA, 3P 1.00 bh Taksir 863,000.00 863,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* UPS 30 KVA on line, 3:3 Phase 1.00 bh Taksir 200,000,000.00 200,000,000.00
* Arde BCC 16 mm2 max. 2 ohm 20.00 m' Taksir 18,280.80 365,616.00
* Kabel NYY 4 x 16 mm2 dari SDP Penerangan 20.00 m' Taksir 92,718.00 1,854,360.00

PANEL PENERANGAN & STOP KONTAK- LANTAI 03 (PPS-LT.03)


* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 6 A / 6 KA, 1P 4.00 bh Taksir 94,600.00 378,400.00
* MCB 10 A / 6 KA, 1P 17.00 bh Taksir 94,600.00 1,608,200.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 10 mm2 max. 2 ohm 25.00 m' Taksir 10,939.20 273,480.00
* Kabel NYY 4 x 10 mm2 dari SDP Penerangan 25.00 m' Taksir 65,989.20 1,649,730.00

PANEL PENERANGAN & STOP KONTAK OK 1- LANTAI 03 (PPS.OK1-LT.03)


* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 10 A / 6 KA, 2P 10.00 bh Taksir 229,350.00 2,293,500.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* UPS 8 KVA on line, 3:1 Phase 1.00 bh Taksir 50,000,000.00 50,000,000.00
* Trafo Isolasi 5 KVA, 1 Phase 1.00 bh Taksir 150,000,000.00 150,000,000.00
* Arde BCC 10 mm2 max. 2 ohm 25.00 m' Taksir 10,939.20 273,480.00
* Kabel NYY 4 x 10 mm2 dari SDP Penerangan 25.00 m' Taksir 65,989.20 1,649,730.00
PANEL PENERANGAN & STOP KONTAK OK 2- LANTAI 03 (PPS.OK2-LT.03)
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 10 A / 6 KA, 2P 10.00 bh Taksir 229,350.00 2,293,500.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* UPS 8 KVA on line, 3:1 Phase 1.00 bh Taksir 50,000,000.00 50,000,000.00
* Trafo Isolasi 5 KVA, 1 Phase 1.00 bh Taksir 150,000,000.00 150,000,000.00
* Arde BCC 10 mm2 max. 2 ohm 25.00 m' Taksir 10,939.20 273,480.00
* Kabel NYY 4 x 10 mm2 dari SDP Penerangan 25.00 m' Taksir 65,989.20 1,649,730.00

PANEL PENERANGAN & STOP KONTAK OK 2- LANTAI 03 (PPS.OK2-LT.03)


* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 10 A / 6 KA, 2P 10.00 bh Taksir 229,350.00 2,293,500.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* UPS 8 KVA on line, 3:1 Phase 1.00 bh Taksir 50,000,000.00 50,000,000.00
* Trafo Isolasi 5 KVA, 1 Phase 1.00 bh Taksir 150,000,000.00 150,000,000.00
* Arde BCC 10 mm2 max. 2 ohm 25.00 m' Taksir 10,939.20 273,480.00
* Kabel NYY 4 x 10 mm2 dari SDP Penerangan 5.00 m' Taksir 65,989.20 329,946.00

2 PEKERJAAN PANEL AC
PANEL AIR CONDITIONING LANTAI 1 (PAC-LT.01)
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00
* MCB 16 A / 6 KA, 1P 14.00 bh Taksir 94,600.00
* MCB 25 A / 6 KA, 3P 4.00 bh Taksir 445,500.00
* MCCB 60 A / 10 KA, 3P 1.00 bh Taksir 862,950.00
* Pilot lamp 3.00 bh Taksir 55,450.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00
* Volt meter 1.00 bh Taksir 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00
* CT 100/5 A 3.00 bh Taksir 324,500.00
* Arde BCC 16 mm2 max. 2 ohm 15.00 m' Taksir 18,280.80
* Kabel NYY 4 x 16 mm2 dari SDP AC 15.00 m' Taksir 92,718.00

PANEL AIR CONDITIONING LANTAI 2


P.AC-LT.02
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00
* MCB 16 A / 6 KA, 1P 7.00 bh Taksir 94,600.00
* MCB 25 A / 6 KA, 1P 8.00 bh Taksir 445,500.00
* MCCB 60 A / 10 KA, 3P 1.00 bh Taksir 862,950.00
* Pilot lamp 3.00 bh Taksir 55,450.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00
* Volt meter 1.00 bh Taksir 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00
* CT 100/5 A 3.00 bh Taksir 324,500.00
* Arde BCC 16 mm2 max. 2 ohm 20.00 m' Taksir 18,280.80
* Kabel NYY 4 x 16 mm2 dari SDP AC 20.00 m' Taksir 92,718.00
PANEL AIR CONDITIONING LANTAI 3
P.AC-LT.03
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCB 16 A / 6 KA, 1P 7.00 bh Taksir 94,600.00 662,200.00
* MCB 25 A / 6 KA, 3P 2.00 bh Taksir 445,500.00 891,000.00
* MCCB 40 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 10 mm2 max. 2 ohm 25.00 m' Taksir 10,939.20 273,480.00
* Kabel NYY 4 x 10 mm2 dari SDP Penerangan 25.00 m' Taksir 65,989.20 1,649,730.00

PANEL AIR CONDITIONING OK LANTAI 3


P.AC OK-LT.03
* Panel 80 x 120 x 30 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 11,520,000.00 11,520,000.00
* MCCB 25 A / 10 KA, 3P 6.00 bh Taksir 638,000.00 3,828,000.00
* MCCB 40 A / 10 KA, 3P 7.00 bh Taksir 638,000.00 4,466,000.00
* MCCB 60 A / 10 KA, 3P 2.00 bh Taksir 705,650.00 1,411,300.00
* MCCB 300 A / 36 KA, 3P 1.00 bh Taksir 3,306,000.00 3,306,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 300/5 A 3.00 bh Taksir 405,000.00 1,215,000.00
* Arde BCC 70 mm2 max. 2 ohm 25.00 m' Taksir 79,910.40 1,997,760.00
* Kabel NYY 4 x 1 x 120 mm2 dari SDP AC 25.00 m' Taksir 627,888.00 15,697,200.00

3 PEKERJAAN PANEL LAIN - LAIN


- Panel Autoclave (Lantai 3)
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCCB 25 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* MCCB 40 A / 10 KA, 3P 2.00 bh Taksir 638,000.00 1,276,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 10 mm2 max. 2 ohm 25.00 m' Taksir 10,939.20 273,480.00
* Kabel NYY 4 x 10 mm2 dari MDP 5.00 m' Taksir 65,989.20 329,946.00

- Panel Lift (Ruang Mesin Lift)


* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCCB 25 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* MCCB 60 A / 10 KA, 3P 2.00 bh Taksir 705,650.00 1,411,300.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 16 mm2 max. 2 ohm 30.00 m' Taksir 18,280.80 548,424.00
* Kabel FRC 4 x 16 mm2 dari MDP 30.00 m' Taksir 185,640.00 5,569,200.00
- Panel Booster (Lantai Atap)
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCCB 25 A / 10 KA, 3P 3.00 bh Taksir 638,000.00 1,914,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 6 mm2 max. 2 ohm 30.00 m' Taksir 6,507.60 195,228.00
* Kabel NYY 4 x 6 mm2 dari MDP 30.00 m' Taksir 38,934.00 1,168,020.00

- Panel Transfer (R.Pompa)


* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00 5,760,000.00
* MCCB 25 A / 10 KA, 3P 1.00 bh Taksir 638,000.00 638,000.00
* MCCB 40 A / 10 KA, 3P 2.00 bh Taksir 638,000.00 1,276,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 100/5 A 3.00 bh Taksir 324,500.00 973,500.00
* Arde BCC 10 mm2 max. 2 ohm 50.00 m' Taksir 10,939.20 546,960.00
* Kabel NYY 4 x 10 mm2 dari MDP 50.00 m' Taksir 65,989.20 3,299,460.00
Sub Jumlah 1,015,170,164.00

IV PEKERJAAN PENERANGAN
1 LANTAI 1
PPS-LT.01
a Instalasi Penerangan
- Lampu RM TL LED 2x10W 31.00 Buah Taksir 637,400.00
- Lampu RM TL LED 3x10W 4.00 Buah Taksir 921,100.00
- Lampu Dowlight Inbow LED Bulb 12W 11.00 Buah Taksir 230,000.00
- Lampu Rosset LED Bulb 12W 8.00 Buah Taksir 85,000.00
- Exhaust Fan 50 W 5.00 Buah Taksir 800,000.00
b Titik instalasi Penerangan 59.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 40.00 Buah Taksir 60,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 40.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

Pekerjaan Saklar
- Saklar Tunggal 11.00 Buah Taksir 49,764.00
- Saklar Ganda 13.00 Buah Taksir 80,652.00
- Saklar Tukar 2.00 Buah Taksir 100,000.00

Cable Tray (Vertikal & Horizontal)


Cable Tray STU 500 x 50 x 3000 x 1.2 mm ( Elektrikal ) 50.00 Meter Taksir 419,271.67
Cable Tray STU 300 x 50 x 3000 x 1.2 mm ( Elektronika ) 50.00 Meter Taksir 215,800.00

2 LANTAI 2
PPS-LT.02
a Instalasi Penerangan
- Lampu RM TL LED 2x10W 4.00 Buah Taksir 637,400.00
- Lampu RM TL LED 3x10W 4.00 Buah Taksir 921,100.00
- Lampu RM TL LED 2x10W w/ cover 4.00 Buah Taksir 737,400.00
- Lampu RM TL LED 3x10W w/ cover 18.00 Buah Taksir 1,021,100.00
- Lampu Dowlight Inbow LED Bulb 12W 27.00 Buah Taksir 230,000.00
- Lampu Rosset LED Bulb 12W 7.00 Buah Taksir 85,000.00
- Exhaust Fan 50 W 5.00 Buah Taksir 800,000.00
b Titik instalasi Penerangan 69.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 27.00 Buah Taksir 60,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 27.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

Pekerjaan Saklar
- Saklar Tunggal 8.00 Buah Taksir 49,764.00
- Saklar Ganda 14.00 Buah Taksir 80,652.00
- Saklar Tukar 2.00 Buah Taksir 100,000.00

PS.ICU-LT.02
a Instalasi Stop Kontak
- Stop Kontak daya 200 W 120.00 Buah Taksir 60,000.00
b Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 120.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

Cable Tray (Vertikal & Horizontal)


Cable Tray STU 500 x 50 x 3000 x 1.2 mm ( Elektrikal ) 50.00 Meter Taksir 419,271.67
Cable Tray STU 300 x 50 x 3000 x 1.2 mm ( Elektronika ) 50.00 Meter Taksir 215,800.00

3 LANTAI 3
PPS-LT.03
a Instalasi Penerangan
- Lampu Clean Room LED 55W c/w PSU 11.00 Buah Taksir 3,465,000.00 38,115,000.00
- Lampu RM TL LED 2x10W 3.00 Buah Taksir 637,400.00 1,912,200.00
- Lampu RM TL LED 3x10W 2.00 Buah Taksir 921,100.00 1,842,200.00
- Lampu Dowlight Inbow LED Bulb 12W 27.00 Buah Taksir 230,000.00 6,210,000.00
- Lampu Rosset LED Bulb 12W 9.00 Buah Taksir 85,000.00 765,000.00
- Exhaust Fan 50 W 5.00 Buah Taksir 800,000.00 4,000,000.00
b Titik instalasi Penerangan 57.00 Titik Taksir 250,000.00 14,250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 41.00 Buah Taksir 60,000.00 2,460,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 41.00 Titik Taksir 250,000.00 10,250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

Pekerjaan Saklar
- Saklar Tunggal 15.00 Buah Taksir 49,764.00 746,460.00
- Saklar Ganda 11.00 Buah Taksir 80,652.00 887,172.00
- Saklar Tukar 2.00 Buah Taksir 100,000.00 200,000.00
PPS.OK1-LT.03
a Instalasi Penerangan
- Lampu Operasi 500W 1.00 Buah Taksir by owner
- Lampu Clean Room LED 55W c/w PSU 12.00 Buah Taksir include sandwich panel
- Lampu Tanda Operasi 5W 1.00 Buah Taksir 125,000.00 125,000.00
b Titik instalasi Penerangan 14.00 Titik Taksir 250,000.00 3,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 10.00 Buah Taksir 60,000.00 600,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 10.00 Titik Taksir 250,000.00 2,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

Pekerjaan Saklar
- Saklar Ganda 2.00 Buah Taksir 80,652.00 161,304.00

PPS.OK2-LT.03
a Instalasi Penerangan
- Lampu Operasi 500W 1.00 Buah Taksir by owner
- Lampu Clean Room LED 55W c/w PSU 12.00 Buah Taksir include sandwich panel
- Lampu Tanda Operasi 5W 1.00 Buah Taksir 125,000.00 125,000.00
b Titik instalasi Penerangan 14.00 Titik Taksir 250,000.00 3,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 10.00 Buah Taksir 60,000.00 600,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 10.00 Titik Taksir 250,000.00 2,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

Pekerjaan Saklar
- Saklar Ganda 2.00 Buah Taksir 80,652.00 161,304.00

PPS.OK3-LT.03
a Instalasi Penerangan
- Lampu Operasi 500W 1.00 Buah Taksir by owner
- Lampu Clean Room LED 55W c/w PSU 12.00 Buah Taksir include sandwich panel
- Lampu Tanda Operasi 5W 1.00 Buah Taksir 125,000.00 125,000.00
b Titik instalasi Penerangan 14.00 Titik Taksir 250,000.00 3,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 10.00 Buah Taksir 60,000.00 600,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 10.00 Titik Taksir 250,000.00 2,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

Pekerjaan Saklar
- Saklar Ganda 2.00 Buah Taksir 80,652.00 161,304.00

Cable Tray (Vertikal & Horizontal)


Cable Tray STU 500 x 50 x 3000 x 1.2 mm ( Elektrikal ) 50.00 Meter Taksir 419,271.67 20,963,583.33
Cable Tray STU 300 x 50 x 3000 x 1.2 mm ( Elektronika ) 50.00 Meter Taksir 215,800.00 10,790,000.00
Sub Jumlah 134,050,527.33
V PEKERJAAN TATA UDARA
1 PEKERJAAN INSTALASI AIR CONDITIONING LANTAI 1
Pengadaan dan pemasangan unit AC, Indoor + Outdoor dengan asesories
termasuk pondasi, penyangga, pipa refrigent, pipa drain, peredam suara
sesuai standar pabrik
AC split 1/2 PK + Remote 2.00 Unit Taksir 3,443,000.00
AC split 1 PK + Remote 5.00 Unit Taksir 3,740,000.00
AC split 1-1/2 PK + Remote 3.00 Unit Taksir 4,675,000.00
AC split 2 PK + Remote 2.00 Unit Taksir 6,193,000.00
AC Cassete 2,5 PK + Remote 2.00 Unit Taksir 21,549,000.00
AC VRV B Clean Type 15.400 Btuh 2.00 Unit Taksir 106,524,000.00
Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 16.00 Unit Taksir 350,000.00
Pemasangan Dudukan Outdoor & Ongkos Pasang 16.00 Unit Taksir 150,000.00
Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + Pipa Conduit 14.00 Titik Taksir 250,000.00
Instalasi listrik dan stop kontak, NYM 3x4 mm2 + Pipa Conduit 2.00 Titik Taksir 400,000.00
Stop Kontak AC 16.00 Unit Taksir 75,000.00
Material Bantu & Testing Commissioning 1.00 Ls Taksir 2,400,000.00

2 PEKERJAAN INSTALASI AIR CONDITIONING LANTAI 2


Pengadaan dan pemasangan unit AC, Indoor + Outdoor dengan asesories
termasuk pondasi, penyangga, pipa refrigent, pipa drain, peredam suara
sesuai standar pabrik
AC split 1/2 PK + Remote 3.00 Unit Taksir 3,443,000.00
AC split 1 PK + Remote 1.00 Unit Taksir 3,740,000.00
AC split 2 PK + Remote 1.00 Unit Taksir 6,193,000.00
AC Cassete 2-1/2 PK + Remote 4.00 Unit Taksir 24,460,000.00
AC Cassete 3 PK + Remote 3.00 Unit Taksir 36,498,000.00
Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 12.00 Unit Taksir 350,000.00
Pemasangan Dudukan Outdoor & Ongkos Pasang 12.00 Unit Taksir 150,000.00
Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + Pipa Conduit 5.00 Titik Taksir 250,000.00
Instalasi listrik dan stop kontak, NYM 3x4 mm2 + Pipa Conduit 7.00 Titik Taksir 400,000.00
Stop Kontak AC 12.00 Unit Taksir 75,000.00
Material Bantu & Testing Commissioning 1.00 Ls Taksir 1,800,000.00

3 PEKERJAAN INSTALASI AIR CONDITIONING LANTAI 3


Pengadaan dan pemasangan unit AC, Indoor + Outdoor dengan asesories
termasuk pondasi, penyangga, pipa refrigent, pipa drain, peredam suara
sesuai standar pabrik
AC split 1/2 PK + Remote 4.00 Unit Taksir 3,443,000.00 13,772,000.00
AC split 3/4 PK + Remote 1.00 Unit Taksir 3,575,000.00 3,575,000.00
AC Cassete 2 PK + Remote 2.00 Unit Taksir 18,359,000.00 36,718,000.00
Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 7.00 Unit Taksir 350,000.00 2,450,000.00
Pemasangan Dudukan Outdoor & Ongkos Pasang 7.00 Unit Taksir 150,000.00 1,050,000.00
Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + Pipa Conduit 5.00 Titik Taksir 300,000.00 1,500,000.00
Instalasi listrik dan stop kontak, NYM 3x4 mm2 + Pipa Conduit 2.00 Titik Taksir 400,000.00 800,000.00
Stop Kontak AC 7.00 Unit Taksir 75,000.00 525,000.00
Material Bantu & Testing Commissioning 1.00 Ls Taksir 1,050,000.00 1,050,000.00

PEKERJAAN TATA UDARA RUANG OK


Pengadaan dan pemasangan unit AC, Indoor + Outdoor dengan asesories
termasuk pondasi, penyangga, pipa refrigent, pipa drain, peredam suara
sesuai standar pabrik
PERALATAN UTAMA, AC AHU VRV
AHU 1 (OK 1)
- Kapasitas : 138.000 BTU/h, (termasuk Supply Fan, 3200 cfm, ESP 750 Pa, 1.00 unit Taksir 370,000,000.00 370,000,000.00
Electric Heater, Pre Filter, Medium Filter, Hepa Filter, Pre Cooling,
dan Auto Restart Thermostat Control Panel) dan outdoor unit
1 Pemasangan Dudukan Outdoor, Indoor & Ongkos Pasang 1.00 ttk Taksir 17,500,000.00 17,500,000.00
a Instalasi Ducting Supply Air lengkap dengan Isolasi Plenum Return Duct,
lengkap penggantung
18" X 20" 9.30 m Taksir 760,000.00 7,068,000.00
12" X 16" 4.20 m Taksir 560,000.00 2,352,000.00
10" X 14" 8.80 m Taksir 480,000.00 4,224,000.00
16" X 18" 16.00 m Taksir 680,000.00 10,880,000.00
10" X 16" 4.20 m Taksir 520,000.00 2,184,000.00
10" X 10" 13.80 m Taksir 400,000.00 5,520,000.00
b Pekerjaan Diffuser & Grille ( Bahan Perforated )
- SAD 24" x 40" Rainforced 4.00 bh Taksir 1,920,000.00 7,680,000.00
- FAG 12" X 18" Linear 1.00 bh Taksir 900,000.00 900,000.00
- RAG 16" x 24" 4.00 bh Taksir 1,200,000.00 4,800,000.00
- Volume Dumper 7.00 bh Taksir 400,000.00 2,800,000.00
- Magnehelic 40 Pa 1.00 bh Taksir 7,500,000.00 7,500,000.00
- Electric Control RH 1.00 bh Taksir 20,000,000.00 20,000,000.00
- Exhaust Fan Low noise, 1600 cfm, Pressure Static 280 Pa 1.00 bh Taksir 4,158,000.00 4,158,000.00
2 Material Bantu & Testing Commissioning 1.00 lot Taksir 14,026,980.00 14,026,980.00

AHU 2 (OK 2)
- Kapasitas : 114.000 BTU/h, (termasuk Supply Fan, 3200 cfm, ESP 750 Pa, 1.00 unit Taksir 314,000,000.00 314,000,000.00
Electric Heater, Pre Filter, Medium Filter, Hepa Filter, Pre Cooling,
dan Auto Restart Thermostat Control Panel) dan outdoor unit
1 Pemasangan Dudukan Outdoor, Indoor & Ongkos Pasang 1.00 ttk Taksir 17,500,000.00 17,500,000.00
a Instalasi Ducting Supply Air lengkap dengan Isolasi Plenum Return Duct,
lengkap penggantung
18" X 20" 8.20 m Taksir 760,000.00 6,232,000.00
12" X 16" 4.00 m Taksir 560,000.00 2,240,000.00
10" X 14" 8.80 m Taksir 480,000.00 4,224,000.00
16" X 18" 11.10 m Taksir 680,000.00 7,548,000.00
10" X 16" 3.70 m Taksir 520,000.00 1,924,000.00
10" X 10" 12.00 m Taksir 400,000.00 4,800,000.00
b Pekerjaan Diffuser & Grille ( Bahan Perforated )
- SAD 24" x 40" Rainforced 4.00 bh Taksir 1,920,000.00 7,680,000.00
- FAG 12" X 18" Linear 1.00 bh Taksir 900,000.00 900,000.00
- RAG 16" x 24" 4.00 bh Taksir 1,200,000.00 4,800,000.00
- Volume Dumper 7.00 bh Taksir 400,000.00 2,800,000.00
- Magnehelic 40 Pa 1.00 bh Taksir 7,500,000.00 7,500,000.00
- Electric Control RH 1.00 bh Taksir 20,000,000.00 20,000,000.00
- Exhaust Fan Low noise, 1250 cfm, Pressure Static 280 Pa 1.00 bh Taksir 3,248,437.50 3,248,437.50
2 Material Bantu & Testing Commissioning 1.00 lot Taksir 12,161,893.13 12,161,893.13

AHU 3 (OK 3)
- Kapasitas : 114.000 BTU/h, (termasuk Supply Fan, 3200 cfm, ESP 750 Pa, 1.00 unit Taksir 314,000,000.00 314,000,000.00
Electric Heater, Pre Filter, Medium Filter, Hepa Filter, Pre Cooling,
dan Auto Restart Thermostat Control Panel) dan outdoor unit
1 Pemasangan Dudukan Outdoor, Indoor & Ongkos Pasang 1.00 ttk Taksir 17,500,000.00 17,500,000.00
a Instalasi Ducting Supply Air lengkap dengan Isolasi Plenum Return Duct,
lengkap penggantung
18" X 20" 8.20 m Taksir 760,000.00 6,232,000.00
12" X 16" 4.00 m Taksir 560,000.00 2,240,000.00
10" X 14" 8.80 m Taksir 480,000.00 4,224,000.00
16" X 18" 11.10 m Taksir 680,000.00 7,548,000.00
10" X 16" 3.70 m Taksir 520,000.00 1,924,000.00
10" X 10" 12.00 m Taksir 400,000.00 4,800,000.00
b Pekerjaan Diffuser & Grille ( Bahan Perforated )
- SAD 24" x 40" Rainforced 4.00 bh Taksir 1,920,000.00 7,680,000.00
- FAG 12" X 18" Linear 1.00 bh Taksir 900,000.00 900,000.00
- RAG 16" x 24" 4.00 bh Taksir 1,200,000.00 4,800,000.00
- Volume Dumper 7.00 bh Taksir 400,000.00 2,800,000.00
- Magnehelic 40 Pa 1.00 bh Taksir 7,500,000.00 7,500,000.00
- Electric Control RH 1.00 bh Taksir 20,000,000.00 20,000,000.00
- Exhaust Fan Low noise, 1250 cfm, Pressure Static 280 Pa 1.00 bh Taksir 3,248,437.50 3,248,437.50
2 Material Bantu & Testing Commissioning 1.00 lot Taksir 12,161,893.13 12,161,893.13

AHU 4 (TRANSFER, PERSIAPAN, RECOVERY, KORIDOR STERIL))


- Kapasitas : 114.000 BTU/h, (termasuk Supply Fan, 3200 cfm, ESP 750 Pa, 1.00 unit Taksir 314,000,000.00 314,000,000.00
Electric Heater, Pre Filter, Medium Filter, Hepa Filter, Pre Cooling,
dan Auto Restart Thermostat Control Panel) dan outdoor unit
1 Pemasangan Dudukan Outdoor, Indoor & Ongkos Pasang 1.00 ttk Taksir 17,500,000.00 17,500,000.00
a Instalasi Ducting Supply Air lengkap dengan Isolasi Plenum Return Duct,
lengkap penggantung
18" X 18" 12.00 m Taksir 720,000.00 8,640,000.00
16" X 18" 3.00 m Taksir 680,000.00 2,040,000.00
14" X 18" 3.00 m Taksir 640,000.00 1,920,000.00
14" X 14" 16.00 m Taksir 560,000.00 8,960,000.00
12" X 14" 8.00 m Taksir 520,000.00 4,160,000.00
12" X 12" 56.00 m Taksir 480,000.00 26,880,000.00
b Pekerjaan Diffuser & Grille ( Bahan Perforated )
- SAD 12" x 12" Rainforced 10.00 bh Taksir 1,920,000.00 19,200,000.00
- FAG 12" X 18" Linear 1.00 bh Taksir 900,000.00 900,000.00
- RAG 16" x 24" 6.00 bh Taksir 1,200,000.00 7,200,000.00
- Volume Dumper 14.00 bh Taksir 400,000.00 5,600,000.00
- Magnehelic 40 Pa 1.00 bh Taksir 7,500,000.00 7,500,000.00
- Electric Control RH 1.00 bh Taksir 20,000,000.00 20,000,000.00
- Exhaust Fan Low noise, 1250 cfm, Pressure Static 280 Pa 1.00 bh Taksir 3,248,437.50 3,248,437.50
2 Material Bantu & Testing Commissioning 1.00 lot Taksir 13,432,453.13 13,432,453.13

II PEKERJAAN DUCTING EXHAUST FAN


LANTAI 1
1 Pipa PVC Class AW Dia. 4" 31.00 m' A.5.1.1.32 127,180.63
2 Pipa PVC Class AW Dia. 6" 3.00 m' A.5.1.1.32.a 269,249.75
3 Fitting dan Accessories 1.00 Ls Taksir -

LANTAI 2
1 Pipa PVC Class AW Dia. 4" 16.00 m' A.5.1.1.32 127,180.63
2 Fitting dan Accessories 1.00 Ls Taksir -

LANTAI 3
1 Pipa PVC Class AW Dia. 4" 19.00 m' A.5.1.1.32 127,180.63 2,416,431.88
2 Fitting dan Accessories 1.00 Ls Taksir 241,643.19 241,643.19
Sub Jumlah 1,841,988,606.94

VI PEKERJAAN PLUMBING
I PEKERJAAN AIR BERSIH
1 Pompa Transfer 1.00 Set Taksir 65,000,000.00 65,000,000.00
Tipe : Vertical Multistage Centrifugal
Kapasitas : debit 10 m3/jam, daya 2 x 5,5 KW
Head : 40 meter
Panel kontrol, pemipaan, fitting, lengkap : valve, WLC, pengkabelan
2 Pipa Pengisi PPR-PN 16 Dia. 2" dari GWT ke Roof Tank 130.00 m' A.5.1.1.29.c 202,471.50 26,321,295.00

LANTAI 1
1 Gate Valve Dia 1 1/2" 1.00 buah Taksir 150,000.00
2 Pipa PPR_PN10 Dia 2" 15.00 m' A.5.1.1.29.a 138,534.00
3 Pipa PPR_PN10 Dia 1 1/2" 15.00 m' A.5.1.1.28.a 89,941.50
4 Pipa PPR_PN10 Dia 1" 11.00 m' A.5.1.1.27.a 40,779.75
5 Pipa PPR_PN10 Dia 1/2" 45.00 m' A.5.1.1.25.a 22,237.88
6 Fitting dan Accessories 1.00 ls Taksir - -

LANTAI 2
1 Gate Valve Dia 1 1/2" 1.00 buah Taksir 150,000.00
2 Pipa PPR_PN10 Dia 2" 10.00 m' A.5.1.1.29.a 138,534.00
3 Pipa PPR_PN10 Dia 1" 3.00 m' A.5.1.1.27.a 40,779.75
4 Pipa PPR_PN10 Dia 3/4" 47.00 m' A.5.1.1.26.a 27,992.25
5 Pipa PPR_PN10 Dia 1/2" 30.00 m' A.5.1.1.25.a 22,237.88
6 Fitting dan Accessories 1.00 ls Taksir - -

LANTAI 3
1 Gate Valve Dia 1 1/2" 1.00 buah Taksir 150,000.00 150,000.00
2 Pipa PPR_PN10 Dia 2" 5.00 m' A.5.1.1.29.a 138,534.00 692,670.00
3 Pipa PPR_PN10 Dia 1" 6.00 m' A.5.1.1.27.a 40,779.75 244,678.50
4 Pipa PPR_PN10 Dia 3/4" 33.00 m' A.5.1.1.26.a 27,992.25 923,744.25
5 Pipa PPR_PN10 Dia 1/2" 24.00 m' A.5.1.1.25.a 22,237.88 533,709.00
6 Fitting dan Accessories 1.00 ls Taksir 718,440.53 718,440.53

LANTAI ATAP
1 Roof Tank Kapasitas 4 m3 1.00 unit Taksir 8,000,000.00 8,000,000.00
Bahan Fiber Glass Anti Lumut
2 Header Pipa GIP Dia. 6" 5.00 m' Taksir 600,000.00 3,000,000.00
3 Header Pipa GIP Dia. 4" 5.00 m' Taksir 400,000.00 2,000,000.00
4 Booster pump package 1.00 Unit Taksir 148,000,000.00 148,000,000.00
Tipe : Vertical Multistage Centrifugal
Kapasitas : debit 4 m3/jam, daya 2 x 2,2 KW
Head : 20 meter
Panel kontrol, pemipaan, fitting, dan aksesoris lengkap : pengkabelan
Valve, Pressure Tank, Pressure Switch, Pressure Gauge, Booster Skid
5 Gate valve Dia. 2 1/2" 6.00 bh Taksir 1,782,000.00 10,692,000.00
6 Gate valve Dia. 2" 1.00 bh Taksir 891,000.00 891,000.00
7 Pipa Drain ( Pipa Kuras ) Roof Tank PVC AW Dia. 2 1/2" 30.00 m' A.5.1.1.29 47,529.63 1,425,888.75
8 Pipa Ring Distribusi PPR_PN10 Dia 2 1/2" 20.00 m' A.5.1.1.30.a 206,734.00 4,134,680.00
9 Fitting dan Accessories 1.00 ls Taksir 1,112,113.75 1,112,113.75

II PEKERJAAN AIR LIMBAH, BEKAS & AIR KOTOR


LANTAI 01
1 Pipa PVC Class AW Dia. 8" 73.00 m A.5.1.1.32.c 412,043.50
2 Pipa PVC Class AW Dia. 6" 39.00 m A.5.1.1.32. a 269,249.75
3 Pipa PVC Class AW Dia. 4" 71.00 m A.5.1.1.32. 127,180.63
4 Pipa PVC Class AW Dia. 3" 37.00 m A.5.1.1.31. 88,454.58
5 Pipa PVC Class AW Dia. 2" 5.00 m A.5.1.1.29. 47,529.63
6 Pipa PPR_PN20 Dia 2" 30.00 m' A.5.1.1.29.b 219,521.50
7 Fitting dan Accessories 1.00 ls Taksir - -
8 Clean Out Dia. 4" 2.00 buah Taksir 200,000.00 400,000.00
9 Clean Out Dia. 3" 3.00 buah Taksir 185,000.00 555,000.00
10 Neutralizing Tank 400 L 1.00 Unit Taksir 45,000,000.00 45,000,000.00
11 Bak kontrol 3.00 Unit Taksir 5,000,000.00 15,000,000.00

LANTAI 02
1 Pipa PVC Class AW Dia. 6" 10.00 m A.5.1.1.32. a 269,249.75
2 Pipa PVC Class AW Dia. 4" 27.30 m A.5.1.1.32. 127,180.63
3 Pipa PVC Class AW Dia. 3" 39.70 m A.5.1.1.31. 88,454.58
4 Pipa PVC Class AW Dia. 2" 13.00 m A.5.1.1.29. 47,529.63
5 Fitting dan Accessories 1.00 ls Taksir -
6 Clean Out Dia. 4" 2.00 buah Taksir 200,000.00
7 Clean Out Dia. 3" 3.00 buah Taksir 185,000.00

LANTAI 03
1 Pipa PVC Class AW Dia. 6" 5.00 m A.5.1.1.32. a 269,249.75 1,346,248.75
2 Pipa PVC Class AW Dia. 4" 15.50 m A.5.1.1.32. 127,180.63 1,971,299.69
3 Pipa PVC Class AW Dia. 3" 37.90 m A.5.1.1.31. 88,454.58 3,352,428.39
4 Pipa PVC Class AW Dia. 2" 25.00 m A.5.1.1.29. 47,529.63 1,188,240.63
5 Fitting dan Accessories 1.00 ls Taksir 1,571,643.49 1,571,643.49
6 Clean Out Dia. 4" 1.00 buah Taksir 200,000.00 200,000.00
7 Clean Out Dia. 3" 2.00 buah Taksir 185,000.00 370,000.00

III PEKERJAAN AIR HUJAN


1 Roof Drain Dia. 4" 18.00 buah Taksir 225,000.00 4,050,000.00
2 Pipa PVC Class AW Dia. 4" 228.00 m A.5.1.1.32 127,180.63 28,997,182.50
2 Pipa PVC Class AW Dia. 6" 40.92 m A.5.1.1.32.a 269,249.75 11,017,699.77
3 Fitting dan Accessories 1.00 ls Taksir 4,001,488.23 4,001,488.23
Sub Jumlah 392,861,451.22

VII PEKERJAAN TELEPHONE & LAN


PEKERJAAN TELEPHONE
1 Paket Unit PABX Sistem eksisting
2 Pesawat Telephone
1 Pes 1 Line LCD Display KX DT 321 1.00 bh Taksir 1,192,000.00 1,192,000.00
2 Pes 3 Line LCD Display KX DT 333 1.00 bh Taksir 1,545,000.00 1,545,000.00
3 DSS Console KX DT 390 1.00 bh Taksir 1,621,000.00 1,621,000.00
4 Pes SLT KX TS 505
- Lantai 01 7.00 bh Taksir 132,000.00
- Lantai 02 4.00 bh Taksir 132,000.00
- Lantai 03 8.00 bh Taksir 132,000.00 1,056,000.00
5 Penyambungan kabel ke sentral telepon eksisting 1.00 ls Taksir 5,000,000.00 5,000,000.00

3 Aksesoris dan Perlengkapan Instalasi


1 Box MDF lengkap dengan LSA with terminal krone 1.00 unit Taksir 1,650,000.00 1,650,000.00
2 Terminal Box
- Lantai 01 1.00 unit Taksir 350,000.00
- Lantai 02 1.00 unit Taksir 350,000.00
- Lantai 03 1.00 unit Taksir 350,000.00 350,000.00

4 Pekerjaan Instalasi Telepon


1 Instalasi kabel ITC 2x2x0,6mm dari TB-TP ke outlet telepon c/w RJ11
- Lantai 1 7.00 titik Taksir 250,000.00
- Lantai 2 4.00 titik Taksir 250,000.00
- Lantai 3 8.00 titik Taksir 250,000.00 2,000,000.00
2 Kabel feeder induk kabel ITC 2x2x0,6mm …. pairs dari :
- LT 1 ke MDF, 20 pair 10.00 m Taksir 31,200.00
- LT 2 ke MDF, 10 pair 15.00 m Taksir 20,400.00
- LT 3 ke MDF, 20 pair 20.00 m Taksir 31,200.00 624,000.00
3 Setting,Testing & Commisioning
- Lantai 1 1.00 ls Taksir 1,500,000.00
- Lantai 2 1.00 ls Taksir 1,500,000.00
- Lantai 3 1.00 ls Taksir 1,500,000.00 1,500,000.00

PEKERJAAN LAN
1 Instalasi kabel UTP Cat 6 dari Hub ke outlet data dan Wifi c/w RJ45
- Lantai 1 13.00 titik Taksir 250,000.00
- Lantai 2 9.00 titik Taksir 250,000.00
- Lantai 3 5.00 titik Taksir 250,000.00 1,250,000.00
2 Kabel feeder induk UTP Cat 6 dari :
- LT 1 ke Main Switch Hub 10.00 m Taksir 45,000.00
- LT 2 ke Main Switch Hub 15.00 m Taksir 45,000.00
- LT 3 ke Main Switch Hub 20.00 m Taksir 45,000.00 900,000.00
3 Setting,Testing & Commisioning
- Lantai 1 1.00 ls Taksir 1,500,000.00
- Lantai 2 1.00 ls Taksir 1,500,000.00
- Lantai 3 1.00 ls Taksir 1,500,000.00 1,500,000.00
4 Data Outlet 21.00 bh Taksir 150,000.00 3,150,000.00
5 Wifi Acces Point Unifi AC LR 6.00 bh Taksir 2,350,000.00 14,100,000.00
6 Switch Hub 16 port 4.00 bh Taksir 750,000.00 3,000,000.00
7 Instalasi Stop Kontak
- Stop Kontak daya 200 W 4.00 Buah Taksir 60,000.00 240,000.00
8 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 4.00 Titik Taksir 250,000.00 1,000,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Sub Jumlah 41,678,000.00

VIII PEKERJAAN INSTALASI CCTV


1 PERALATAN UTAMA
1 Network Video Recorder 16 CH 1.00 unit Taksir 15,000,000.00 15,000,000.00
2 Hardisk 4 TB 1.00 bh Taksir 2,140,000.00 2,140,000.00
3 Mouse 1.00 bh Taksir 150,000.00 150,000.00
4 LCD monitor 32" 1.00 bh Taksir 6,500,000.00 6,500,000.00
5 Switch Hub 16 port 1.00 Unit Taksir 2,700,000.00 2,700,000.00
6 Frame 1.00 bh Taksir 3,000,000.00 3,000,000.00
7 Surge Arrester PF20 1P+N 1.00 bh Taksir 785,950.00 785,950.00
8 UPS 2 KVA, 1 phase 1.00 unit Taksir 3,450,000.00 3,450,000.00
9 Instalasi Cable UTP. Cat 6 ke Hub per lantai 45.00 m Taksir 25,000.00 1,125,000.00

2 CCTV LANTAI 1
1 IP Camera fixed type indoor, PoE, variable focal lens 2.8-6.0mm, 3.00 bh Taksir 2,200,000.00
c/w camera bracket
2 IP Camera fixed type outdoor, PoE, variable focal lens 2.8-6.0mm, 2.00 bh Taksir 2,915,000.00
c/w camera bracket
3 Switch Hub POE 8 Port 1.00 bh Taksir 1,300,000.00
4 Instalasi Cable UTP. Cat 6 128.00 m Taksir 25,000.00
5 Instalasi Stop Kontak
- Stop Kontak daya 200 W 1.00 Buah Taksir 60,000.00
6 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 1.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

3 CCTV LANTAI 2
1 IP Camera fixed type indoor, PoE, variable focal lens 2.8-6.0mm, 5.00 bh Taksir 2,200,000.00
c/w camera bracket
2 Switch Hub POE 8 Port 1.00 bh Taksir 1,300,000.00
3 Instalasi Cable UTP. Cat 6 111.00 m Taksir 25,000.00
4 Instalasi Stop Kontak
- Stop Kontak daya 200 W 1.00 Buah Taksir 60,000.00
5 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 1.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit

4 CCTV LANTAI 3
1 IP Camera fixed type indoor, PoE, variable focal lens 2.8-6.0mm, 3.00 bh Taksir 2,200,000.00 6,600,000.00
c/w camera bracket
2 Switch Hub POE 8 Port 1.00 bh Taksir 1,300,000.00 1,300,000.00
3 Instalasi Cable UTP. Cat 6 33.00 m Taksir 25,000.00 825,000.00
4 Instalasi Stop Kontak
- Stop Kontak daya 200 W 1.00 Buah Taksir 60,000.00 60,000.00
5 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 1.00 Titik Taksir 250,000.00 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Sub Jumlah 43,885,950.00

IX PEKERJAAN INSTALASI TATA SUARA


1 PERALATAN UTAMA TATA SUARA (LANTAI 01)
DVD/MMC/USB/MP3 Player w/ Radio Tuner 1.00 unit Taksir 9,750,000.00 9,750,000.00
Paging Microphone w/ Chime 1.00 unit Taksir 852,000.00 852,000.00
Speaker Selector 10 Zone 1.00 unit Taksir 8,014,000.00 8,014,000.00
Equalizer 1.00 unit Taksir 2,862,000.00 2,862,000.00
Mixer Pre Amplifier w/ Modules 1.00 unit Taksir 10,983,000.00 10,983,000.00
Power Amplifier 1 x 240W 2.00 unit Taksir 3,950,000.00 7,900,000.00
Monitor Panel 1.00 unit Taksir 3,478,000.00 3,478,000.00
Cabinet Rack w/ Acc 1.00 lot Taksir 12,750,000.00 12,750,000.00
Main Distribution Frame (MDF) 1.00 lot Taksir 3,000,000.00 3,000,000.00
Surge Arrester PF20 1P+N 1.00 bh Taksir 785,950.00 785,950.00
UPS 2 KVA, 1 phase 1.00 unit Taksir 3,450,000.00 3,450,000.00
Material Bantu dan Testing Comisioning 1.00 lot Taksir 1,000,000.00 1,000,000.00
Instalasi Kabel NYMHY 3 x 2.5 mm2 Ke TB-TS per lantai 45.00 m Taksir 54,000.00 2,430,000.00
dalam PVC Conduit 20mm

2 TATA SUARA LANTAI 1


1 TB Sound System 1.00 unit Taksir 350,000.00
2 Ceiling Speaker 6 W 17.00 unit Taksir 205,700.00
3 Wall Speaker 6 W 1.00 unit Taksir 400,000.00
4 Volume Control 8.00 unit Taksir 129,800.00
5 Instalasi titik Sound System dg Kabel NYMHY 3 x 1,5 mm2 25.00 ttk Taksir 200,000.00
dalam PVC Conduit 20mm
6 Material Bantu dan Testing Comisioning 1.00 lot Taksir 1,000,000.00

3 TATA SUARA LANTAI 2


1 TB Sound System 1.00 unit Taksir 350,000.00
2 Ceiling Speaker 6 W 16.00 unit Taksir 205,700.00
3 Wall Speaker 6 W 1.00 unit Taksir 400,000.00
4 Volume Control 4.00 unit Taksir 129,800.00
5 Instalasi titik Sound System dg Kabel NYMHY 3 x 1,5 mm2 20.00 ttk Taksir 200,000.00
dalam PVC Conduit 20mm
6 Material Bantu dan Testing Comisioning 1.00 lot Taksir 1,000,000.00

4 TATA SUARA LANTAI 3


1 TB Sound System 1.00 unit Taksir 350,000.00 350,000.00
2 Ceiling Speaker 6 W 21.00 unit Taksir 205,700.00 4,319,700.00
3 Wall Speaker 6 W 1.00 unit Taksir 400,000.00 400,000.00
4 Volume Control 7.00 unit Taksir 129,800.00 908,600.00
5 Instalasi titik Sound System dg Kabel NYMHY 3 x 1,5 mm2 28.00 ttk Taksir 200,000.00 5,600,000.00
dalam PVC Conduit 20mm
6 Material Bantu dan Testing Comisioning 1.00 lot Taksir 1,000,000.00 1,000,000.00
Sub Jumlah 79,833,250.00

X PEKERJAAN FIRE ALARM & FIRE EXTINGUSHER


PERALATAN UTAMA
1 MCFA Konvensional 10 Zonec/w battery 1.00 unit Taksir 10,000,000.00 10,000,000.00
2 Panel Annunciator 10 Zone 1.00 unit Taksir 4,000,000.00 4,000,000.00
3 Surge Arrester PF20 1P+N 1.00 bh Taksir 785,950.00 785,950.00
4 UPS 2 KVA, 1 phase 1.00 unit Taksir 3,450,000.00 3,450,000.00

PEKERJAAN INSTALASI
1 Instalasi Lantai 1
- Terminal Box ( TB - FA.BS ) 1.00 Unit Taksir 750,000.00
- Smoke Detector 5.00 Buah Taksir 300,000.00
- ROR Heat Detector 14.00 Buah Taksir 120,000.00
- Alarm Bell 1.00 Buah Taksir 300,000.00
- Indicator lamp 1.00 Buah Taksir 100,000.00
- Manual push button 1.00 Buah Taksir 2,000,000.00
- End of line resistor 3.00 Buah Taksir 20,000.00
- Instalasi Detector dan Alarm NYA 2 x 1,5 mm2 dalam conduit 20mm 22.00 Titik Taksir 300,000.00

2 Instalasi Lantai 2
- Terminal Box ( TB - FA.BS ) 1.00 Unit Taksir 750,000.00
- ROR Heat Detector 23.00 Buah Taksir 120,000.00
- Alarm Bell 1.00 Buah Taksir 300,000.00
- Indicator lamp 1.00 Buah Taksir 100,000.00
- Manual push button 1.00 Buah Taksir 2,000,000.00
- End of line resistor 2.00 Buah Taksir 20,000.00
- Instalasi Detector dan Alarm NYA 2 x 1,5 mm2 dalam conduit 20mm 26.00 Titik Taksir 300,000.00

3 Instalasi Lantai 3
- Terminal Box ( TB - FA.BS ) 1.00 Unit Taksir 750,000.00 750,000.00
- ROR Heat Detector 27.00 Buah Taksir 120,000.00 3,240,000.00
- Alarm Bell 1.00 Buah Taksir 300,000.00 300,000.00
- Indicator lamp 1.00 Buah Taksir 100,000.00 100,000.00
- Manual push button 1.00 Buah Taksir 2,000,000.00 2,000,000.00
- End of line resistor 2.00 Buah Taksir 20,000.00 40,000.00
- Instalasi Detector dan Alarm NYA 2 x 1,5 mm2 dalam conduit 20mm 30.00 Titik Taksir 300,000.00 9,000,000.00

III PEKERJAAN FIRE EXTINGUSHER


1 Pengadaan Fire Extingusher Dry Chemical 6 kg Lantai 1 8.00 Unit Taksir 750,000.00
2 Pengadaan Fire Extingusher Dry Chemical 6 kg Lantai 2 7.00 Unit Taksir 750,000.00
3 Pengadaan Fire Extingusher Dry Chemical 6 kg Lantai 3 7.00 Unit Taksir 750,000.00 5,250,000.00
Sub Jumlah 38,915,950.00

XI PEKERJAAN LIFT
Penyediaan dan pemasangan Lift Hospital lengkap
dengan aksessories, ARD dan semua material bantu
yang diperlukan sesuai dengan spesifikasi teknik
dan petunjuk pabrik seperti pada gambar
Digital Electronic Control, ACVVVF-
Vector Inverter Control Digital - Sicon Zuci 4000
Traction Machine Worm Gear Box
Traction Machine , termasuk pelatihan, perijinan, buku petunjuk operasional,
Testing, Cvommissioning
1 Pengadaan Lift
Penggunaan : Lift hospital & fire Service 1.00 Unit Taksir 450,000,000.00 450,000,000.00
Kapasitas : 1.600 Kg / 24 Orang
Speed : 60 MPM
Power Control : AC Variable Voltage Variable Frequency
No. of Stop / Service : 3 Stop / 3 Lantai
2 Biaya Pemasangan & Instalasi 1.00 Ls Taksir 30,000,000.00 30,000,000.00
Sub Jumlah 480,000,000.00

XII PEKERJAAN GAS MEDIS


I PEKERJAAN INSTALASI GAS SENTRAL eksisting
II WALL POINT OUTLET
MOUNTING TYPE
Outlet : Pin Index Push
Box : powder coated pain finish
Quick Connect system
Lantai 2
Oxygen ( O ) 24.00 bh Taksir 1,488,000.00
Compressed Air ( A ) 12.00 bh Taksir 1,488,000.00
Vacuum ( V ) 12.00 bh Taksir 1,757,000.00
Lantai 3
Oxygen ( O ) 9.00 bh Taksir 1,488,000.00 13,392,000.00
Nitrous Oxide ( N ) 3.00 bh Taksir 1,488,000.00 4,464,000.00
Compressed Air ( A ) 3.00 bh Taksir 1,488,000.00 4,464,000.00
Vacuum ( V ) 9.00 bh Taksir 1,757,000.00 15,813,000.00
AGSS 3.00 bh Taksir 12,638,000.00 37,914,000.00
Ceiling Outlet 4 gas (O,N,A,V) 3.00 bh Taksir 17,058,000.00 51,174,000.00

III INSTALASI GAS MEDIS


ASTM B 819 Type L
Merk : Brasco, Crane, Unipro
a Pipa tembaga tidak mengandung phospor atau oil , kedua ujungnya
b Material alat bantu
Spesifikasi:
* Brecket dan gantungan pipa yang digunakan dari pipa besi,
ling drant atau besi siku
* Penyambungan pipa dilakukan dengan fitting material dari tembaga
dan di las dengan kawat las
c Fitting
Spesifikasi
a.Fitting material seperti tube fitting terbuat dari tembaga
b.terdiri dari elbow,sock,reducer, tee, dll
d Pipa Induk
Oxygen ( O )
Copper Tube dia 7/8" (termasuk pipa tegak Shaft) 65.00 m' Taksir 255,000.00 16,575,000.00

Nitrous Oxide ( N )
Copper Tube dia 1/2" (termasuk pipa tegak Shaft) 65.00 m' Taksir 115,000.00 7,475,000.00
Compressed Air ( A )
Copper Tube dia 5/8" (termasuk pipa tegak Shaft) 65.00 m' Taksir 146,000.00 9,490,000.00

Vaccum ( V )
Copper Tube dia 7/8" (termasuk pipa tegak Shaft) 65.00 m' Taksir 255,000.00 16,575,000.00

e Pipa Instalasi
Lantai 2
Oxygen ( O )
Copper Tube dia 3/4" 48.20 m Taksir 173,000.00
Copper Tube dia 1/2" 38.80 m Taksir 115,000.00
Copper Tube dia 3/8" 72.00 m Taksir 82,000.00

Compressed Air ( A )
Copper Tube dia 3/4" 48.20 m Taksir 173,000.00
Copper Tube dia 1/2" 38.80 m Taksir 115,000.00
Copper Tube dia 3/8" 36.00 m Taksir 82,000.00

Vacuum ( V )
Copper Tube dia 7/8" 48.20 m Taksir 255,000.00
Copper Tube dia 5/8" 38.80 m Taksir 146,000.00
Copper Tube dia 1/2" 36.00 m Taksir 115,000.00

Lantai 3
Oxygen ( O )
Copper Tube dia 5/8" 18.30 m Taksir 146,000.00 2,671,800.00
Copper Tube dia 1/2" 64.30 m Taksir 115,000.00 7,394,500.00
Copper Tube dia 3/8" 27.00 m Taksir 82,000.00 2,214,000.00

Nitrous Oxide ( N )
Copper Tube dia 5/8" 18.30 m Taksir 146,000.00 2,671,800.00
Copper Tube dia 1/2" 35.20 m Taksir 115,000.00 4,048,000.00
Copper Tube dia 3/8" 9.00 m Taksir 82,000.00 738,000.00
Compressed Air ( A )
Copper Tube dia 5/8" 18.30 m Taksir 146,000.00 2,671,800.00
Copper Tube dia 1/2" 35.20 m Taksir 115,000.00 4,048,000.00
Copper Tube dia 3/8" 9.00 m Taksir 82,000.00 738,000.00

Vacuum ( V )
Copper Tube dia 3/4" 18.30 m Taksir 173,000.00 3,165,900.00
Copper Tube dia 5/8" 64.30 m Taksir 146,000.00 9,387,800.00
Copper Tube dia 1/2" 27.00 m Taksir 115,000.00 3,105,000.00

e Fitting & Accessories


Fitting & Accessories 1.00 Ls Taksir 3,508,050.00 3,508,050.00

f Zone Valve dan Alarm System


Lantai 2 : Zone Valve 3 Gases 1.00 bh Taksir 10,059,000.00
Area Alarm 3 Gases 1.00 bh Taksir 7,615,000.00
Ball Valve 3.00 bh Taksir 935,000.00

Lantai 3 : Zone Valve 4 Gases 3.00 bh Taksir 12,872,000.00 38,616,000.00


Area Alarm 4 Gases 3.00 bh Taksir 8,832,000.00 26,496,000.00
Ball Valve 4.00 bh Taksir 935,000.00 3,740,000.00

IV ACCESSORIES
SPESIFIKASI
a Flowmeter 33.00 bh Taksir 1,250,000.00 41,250,000.00
Solid Brass Body Chrome Plated for durability
Unbreakable Polycarbonate bottle
Flow rate : 15 LPM
Standard pressure : 3.5 kgf/cm2
Safety valve pressure : 0.7 kg/cm2
b Wall Suction 21.00 bh Taksir 4,000,000.00 84,000,000.00
Display type : Digital Gauge
Unbreakable polycarbonate collection bottle (1,200 cc) with -
over flow protector
Regulated vacuum range : 0 - 700 mmHg
c Bed Head 18.00 unit Taksir 2,524,000.00 45,432,000.00
Model : Bedhead single unit
Dims : 1200 mm x 80 mm x 220 mm
Assesories :
power plug Double Gang
power plug Single Gang
power switch
T4 Fluoresent Lamp for direct light
provision for nurse call
provision for medical gases
d Moveable Suction Unit 3.00 bh Taksir 2,000,000.00 6,000,000.00
Khusus Untuk Ruang OK
Type : Movable kick type
Suction gauge : 0 - 760 mmHg
Over flow protector
Moveable kick type bottle guide w/ caster
V TESTING & COMMISSIONING
Testing & Commisioning 1.00 lot Taksir 2,789,088.00 2,789,088.00
Sub Jumlah 472,021,738.00

XIII PEKERJAAN PENANGKAL PETIR


Penangkal petir sesuai spesifikasi dan gambar, termasuk test comisioning,
dan ijin depnaker
1 Penangkal Petir sistem ESE radius proteksi 50 m 1.00 Unit Taksir 30,000,000.00 30,000,000.00
2 NYY 1 x 70 mm2 50.00 m Taksir 200,000.00 10,000,000.00
3 Bak Kontrol Pentanahan dan grounding system. 1.00 ttk Taksir 8,000,000.00 8,000,000.00
4 Lampu Obstruction 60 W 1.00 Unit Taksir 1,000,000.00 1,000,000.00
5 Lightning Event Counter 1.00 Unit Taksir 7,000,000.00 7,000,000.00
6 Izin Depnaker 1.00 ls Taksir 5,000,000.00 5,000,000.00
Sub Jumlah 61,000,000.00
JUMLAH TOTAL 5,265,268,641.49
RENCANA ANGGARAN BIAYA (RAB)

REKAPITULASI

PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG


SUB PEKERJAAN : STRUKTUR & ARSITEKTUR
LOKASI :
TH. ANGGARAN :

NO URAIAN PEKERJAAN JUMLAH HARGA


01 02 03

A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN Rp 195,975,596.00
II PEKERJAAN PONDASI & PILE CAP Rp 925,140,962.65
III PEKERJAAN TANAH Rp 4,450,443.41
IV PEKERJAAN BETON BERTULANG Rp 2,231,554,287.27
V PEKERJAAN RANGKA BAJA & PENUTUP ATAP Rp 202,046,190.10

B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA Rp 1,874,747,586.08
II PEKERJAAN PLAFOND Rp 100,339,844.39
III PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 464,457,068.79
IV PEKERJAAN PENGECATAN Rp 116,740,307.94
V PEKERJAAN SANITAIR Rp 103,973,403.00
VI PEKERJAAN PENGADAAN RALLING , MEJA COUNTER & WALL PROTECTOR Rp 34,783,000.00
VII PEKERJAAN LAIN - LAIN Rp 109,300,000.00

JUMLAH Rp 6,363,508,689.63
RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG


SUB PEKERJAAN : STRUKTUR & ARSITEKTUR
LOKASI :
TH. ANGGARAN :

NO URAIAN PEKERJAAN VOLUME KODE HARGA SATUAN JUMLAH HARGA


01 02 03 04 05 06

A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN
1 Pagar Proyek 120.00 m' A.2.2.1.2 602,096.00 72,251,520.00
2 Papan Nama Proyek 1.00 Ls Taksir 1,000,000.00 1,000,000.00
3 Direksi keet 36.00 m2 A.2.2.1.5 1,912,746.00 68,858,856.00
4 Barak Kerja 20.00 m2 A.2.2.1.7 1,450,031.00 29,000,620.00
5 Pengukuran dan Bowplank 120.00 m' A.2.2.1.4 144,705.00 17,364,600.00
6 Air Kerja & Listrik 1.00 Ls Taksir 7,500,000.00 7,500,000.00
Sub Jumlah 195,975,596.00

II PEKERJAAN PONDASI & PILE CAP


II.A PEKERJAAN PONDASI STRAUS PILE
Pekerjaan Persiapan
1 Mob. Dan Demob. Alat ( Alat Bor, service crane, Loader/ excavator 1.00 Ls Taksir 50,000,000.00 50,000,000.00
dan alat bantu lainnya )
2 Pengeboran 912.00 m' Taksir 200,000.00 182,400,000.00
3 Pasang Casing 76.00 titik Taksir 150,000.00 11,400,000.00
4 Beton Bertulang Straus Pile K-275 diameter 40 cm :
- Beton K - 275 114.55 m3 A.4.1.1.9 1,089,044.00 124,746,940.88
- Pembesian 14,178.16 kg A.4.1.1.17 13,300.10 188,570,963.60
5 Tes PDA 2.00 titik Taksir 20,000,000.00 40,000,000.00
6 Pembuangan Tanah Pengeboran 114.55 m3 A.2.3.1.8 28,215.00 3,231,949.25

II.B PEKERJAAN PILE CAP


1 Pecah Kepala Tiang Bored Pile 76.00 titik Taksir 150,000.00 11,400,000.00
2 Galian tanah Pile Cap 88.92 m3 A.2.3.1.1 64,350.00 5,722,130.70
3 Urugan Pasir Pile Cap 4.62 m3 A.2.3.1.11 283,140.00 1,306,691.10
4 Lantai kerja Pile Cap 4.92 m3 A.4.1.1.4 886,773.56 4,358,492.03
5 Pekerjaan Beton Bertulang Pile Cap dengan Mutu Beton K-275
a. Pile Cap Tipe PC1
- Beton K - 275 0.32 m3 A.4.1.1.9 1,089,044.00 348,494.08
- Pembesian 31.67 kg A.4.1.1.17 13,300.10 421,258.11
- Bekisting Batako 1.60 m2 A.4.4.1.21 185,946.82 297,514.91
b. Pile Cap Tipe PC2
- Beton K - 275 2.40 m3 A.4.1.1.9 1,089,044.00 2,613,705.60
- Pembesian 308.18 kg A.4.1.1.17 13,300.10 4,098,848.96
- Bekisting Batako 8.40 m2 A.4.4.1.21 185,946.82 1,561,953.25
c. Pile Cap Tipe PC3
- Beton K - 275 30.91 m3 A.4.1.1.9 1,089,044.00 33,664,528.13
- Pembesian 3,527.80 kg A.4.1.1.17 13,300.10 46,920,080.27
- Bekisting Batako 64.51 m2 A.4.4.1.21 185,946.82 11,995,800.99
d. Pile Cap Tipe PC4
- Beton K - 275 22.40 m3 A.4.1.1.9 1,089,044.00 24,394,585.60
- Pembesian 2,243.90 kg A.4.1.1.17 13,300.10 29,844,091.08
- Bekisting Batako 44.80 m2 A.4.4.1.21 185,946.82 8,330,417.36
e. Pile Cap Tipe PC5L
- Beton K - 275 7.35 m3 A.4.1.1.9 1,089,044.00 8,004,473.40
- Pembesian 760.44 kg A.4.1.1.17 13,300.10 10,113,994.53
- Bekisting Batako 7.70 m2 A.4.4.1.21 185,946.82 1,431,790.48
6 Beton Bertulang Plat Dinding Pit Lift
- Beton K - 275 4.16 m3 A.4.1.1.9 1,089,044.00 4,530,423.04
- Pembesian 551.37 kg A.4.1.1.17 13,300.10 7,333,216.85
- Bekisting 41.60 m2 A.4.1.1.25 288,359.50 11,995,755.20
7 Beton Bertulang Pondasi CT SCAN
- Beton K - 275 1.50 m3 A.4.1.1.9 1,089,044.00 1,633,566.00
- Pembesian 135.94 kg A.4.1.1.17 13,300.10 1,807,992.32
- Bekisting 2.50 m2 A.4.1.1.20 135,014.00 337,535.00

II.C PEKERJAAN PONDASI BATU


1 Galian Tanah Pondasi 156.07 m3 A.2.3.1.1 64,350.00 10,043,200.51
2 Urugan Pasir Bawah Pondasi 9.18 m3 A.2.3.1.11 283,140.00 2,599,416.60
3 Pasangan Batu Kosong 36.72 m3 A.3.2.1.9 517,935.00 19,019,973.70
4 Pasangan Batu Belah 72.30 m3 A.3.2.1.4 803,315.70 58,077,976.69
5 Urugan Tanah Kembali 37.87 m3 A.2.3.1.9 15,400.00 583,202.44
Sub Jumlah 925,140,962.65

III PEKERJAAN TANAH


1 Urugan Tanah Kembali (untuk Peninggian Elevasi) 72.25 m3 A.2.3.1.9 15,400.00 1,112,610.85
2 Pemadatan 72.25 m3 A.2.3.1.10 46,200.00 3,337,832.56
Sub Jumlah 4,450,443.41

IV PEKERJAAN BETON BERTULANG


IV.A LANTAI 01
Pekerjaan Sloof
1 Galian Tanah Sloof 27.42 m3 A.2.3.1.1 64,350.00 1,764,414.26
2 Urugan Pasir Sloof 2.71 m3 A.2.3.1.11 283,140.00 767,900.45
3 Lantai Kerja Sloof 2.71 m3 A.4.1.1.4 886,773.56 2,405,007.48
4 Beton Bertulang Sloof Tipe S1
- Beton K - 275 17.82 m3 A.4.1.1.9 1,089,044.00 19,404,041.47
- Pembesian 7,121.70 kg A.4.1.1.17 13,300.10 94,719,386.86
- Bekisting Batako 142.54 m2 A.4.4.1.21 185,946.82 26,504,859.15
5 Beton Bertulang Sloof Tipe S2
- Beton K - 275 0.91 m3 A.4.1.1.9 1,089,044.00 993,208.13
- Pembesian 284.04 kg A.4.1.1.17 13,300.10 3,777,767.21
- Bekisting Batako 9.12 m2 A.4.4.1.21 185,946.82 1,695,834.96
6 Beton Bertulang Sloof Tipe SP
- Beton K - 175 3.27 m3 A.4.1.1.5 1,016,238.67 3,318,374.93
- Pembesian 397.98 kg A.4.1.1.17 13,300.10 5,293,177.91
- Bekisting 43.54 m2 A.4.4.1.21 185,946.82 8,095,752.48

Beton Bertulang Kolom


1 Beton Bertulang Kolom Tipe K.1
- Beton K - 275 14.61 m3 A.4.1.1.9 1,089,044.00 15,908,754.75
- Pembesian 3,481.19 kg A.4.1.1.17 13,300.10 46,300,149.64
- Bekisting 146.08 m2 A.4.1.1.22 252,472.00 36,881,109.76
2 Beton Bertulang Kolom Tipe KL
- Beton K - 275 1.99 m3 A.4.1.1.9 1,089,044.00 2,169,375.65
- Pembesian 469.19 kg A.4.1.1.17 13,300.10 6,240,287.54
- Bekisting 26.56 m2 A.4.1.1.22 252,472.00 6,705,656.32
3 Beton Bertulang Kolom Tipe KP
- Beton K - 175 1.85 m3 A.4.1.1.5 1,016,238.67 1,880,991.08
- Pembesian 185.09 kg A.4.1.1.17 13,300.10 2,461,761.23
- Bekisting 23.14 m2 A.4.1.1.22 252,472.00 5,841,363.79

Beton Bertulang Balok Separator


1 Beton Bertulang Balok Tipe BS
- Beton K - 275 0.29 m3 A.4.1.1.9 1,089,044.00 320,178.94
- Pembesian 44.75 kg A.4.1.1.17 13,300.10 595,137.28
- Bekisting 3.92 m2 A.4.1.1.23 261,794.50 1,026,234.44

Beton Bertulang Pekerjaan Tangga


1 Beton Bertulang Balok Bordes
- Beton K - 275 0.28 m3 A.4.1.1.9 1,089,044.00 304,932.32
- Pembesian 41.41 kg A.4.1.1.17 13,300.10 550,802.74
- Bekisting 2.94 m2 A.4.1.1.23 261,794.50 769,675.83
2 Beton Bertulang Kolom Bordes
- Beton K - 275 0.16 m3 A.4.1.1.9 1,089,044.00 171,524.43
- Pembesian 52.71 kg A.4.1.1.17 13,300.10 700,986.09
- Bekisting 2.31 m2 A.4.1.1.22 252,472.00 583,210.32
3 Beton Bertulang Plat Tangga
- Beton K - 275 4.00 m3 A.4.1.1.9 1,089,044.00 4,356,176.00
- Pembesian 802.55 kg A.4.1.1.17 13,300.10 10,674,051.02
- Bekisting 114.84 m2 A.4.1.1.26 238,227.00 27,357,941.03
Sub Jumlah 340,540,025.49

IV. B LANTAI 02
Beton Bertulang Balok
1 Beton Bertulang Balok Tipe B1A
- Beton K - 275 23.21 m3 A.4.1.1.9 1,089,044.00 25,275,513.29
- Pembesian 4,282.67 kg A.4.1.1.17 13,300.10 56,959,999.84
- Bekisting 196.92 m2 A.4.1.1.23 261,794.50 51,553,620.12
2 Beton Bertulang Balok Tipe B2
- Beton K - 275 3.84 m3 A.4.1.1.9 1,089,044.00 4,177,845.05
- Pembesian 701.26 kg A.4.1.1.17 13,300.10 9,326,837.54
- Bekisting 37.67 m2 A.4.1.1.23 261,794.50 9,860,489.84
3 Beton Bertulang Balok Tipe B3
- Beton K - 275 5.85 m3 A.4.1.1.9 1,089,044.00 6,368,729.31
- Pembesian 1,045.93 kg A.4.1.1.17 13,300.10 13,910,979.23
- Bekisting 73.10 m2 A.4.1.1.23 261,794.50 19,137,177.95
4 Beton Bertulang Balok Tipe B5
- Beton K - 275 1.66 m3 A.4.1.1.9 1,089,044.00 1,811,951.41
- Pembesian 298.78 kg A.4.1.1.17 13,300.10 3,973,763.75
- Bekisting 26.34 m2 A.4.1.1.23 261,794.50 6,896,583.41
5 Beton Bertulang Balok Tipe BP
- Beton K - 275 4.03 m3 A.4.1.1.9 1,089,044.00 4,387,758.28
- Pembesian 614.16 kg A.4.1.1.17 13,300.10 8,168,445.34
- Bekisting 73.87 m2 A.4.1.1.23 261,794.50 19,337,450.74

Beton Bertulang Plat


1 Beton Bertulang Plat Tipe S1
- Beton K - 275 49.27 m3 A.4.1.1.9 1,089,044.00 53,656,762.26
- Pembesian 9,057.82 kg A.4.1.1.17 13,300.10 120,469,914.60
- Bekisting 459.85 m2 A.4.1.1.24 300,872.00 138,355,868.85
2 Beton Bertulang Plat Tipe S2
- Beton K - 275 0.94 m3 A.4.1.1.9 1,089,044.00 1,023,701.36
- Pembesian 153.13 kg A.4.1.1.17 13,300.10 2,036,669.48
- Bekisting 10.34 m2 A.4.1.1.24 300,872.00 3,111,016.48

Beton Bertulang Kolom


1 Beton Bertulang Kolom Tipe K.1
- Beton K - 275 14.61 m3 A.4.1.1.9 1,089,044.00 15,908,754.75
- Pembesian 3,181.20 kg A.4.1.1.17 13,300.10 42,310,227.91
- Bekisting 146.08 m2 A.4.1.1.22 252,472.00 36,881,109.76
2 Beton Bertulang Kolom Tipe KL
- Beton K - 275 1.99 m3 A.4.1.1.9 1,089,044.00 2,169,375.65
- Pembesian 432.83 kg A.4.1.1.17 13,300.10 5,756,660.66
- Bekisting 26.56 m2 A.4.1.1.22 252,472.00 6,705,656.32
3 Beton Bertulang Kolom Tipe KP
- Beton K - 175 1.87 m3 A.4.1.1.5 1,016,238.67 1,903,284.82
- Pembesian 187.29 kg A.4.1.1.17 13,300.10 2,490,938.32
- Bekisting 23.41 m2 A.4.1.1.22 252,472.00 5,910,596.35

Beton Bertulang Balok Separator


1 Beton Bertulang Balok Tipe BS
- Beton K - 275 0.29 m3 A.4.1.1.9 1,089,044.00 320,178.94
- Pembesian 44.75 kg A.4.1.1.17 13,300.10 595,137.28
- Bekisting 3.92 m2 A.4.1.1.23 261,794.50 1,026,234.44

Beton Bertulang Pekerjaan Tangga


1 Beton Bertulang Balok Bordes
- Beton K - 275 0.28 m3 A.4.1.1.9 1,089,044.00 304,932.32
- Pembesian 41.41 kg A.4.1.1.17 13,300.10 550,802.74
- Bekisting 2.94 m2 A.4.1.1.23 261,794.50 769,675.83
2 Beton Bertulang Kolom Bordes
- Beton K - 275 0.16 m3 A.4.1.1.9 1,089,044.00 171,524.43
- Pembesian 52.71 kg A.4.1.1.17 13,300.10 700,986.09
- Bekisting 2.31 m2 A.4.1.1.22 252,472.00 583,210.32
3 Beton Bertulang Plat Tangga
- Beton K - 275 4.00 m3 A.4.1.1.9 1,089,044.00 4,356,176.00
- Pembesian 802.55 kg A.4.1.1.17 13,300.10 10,674,051.02
- Bekisting 114.84 m2 A.4.1.1.26 238,227.00 27,357,941.03
Sub Jumlah 727,248,533.11

IV. C LANTAI 03
Beton Bertulang Balok
1 Beton Bertulang Balok Tipe B1A
- Beton K - 275 22.95 m3 A.4.1.1.9 1,089,044.00 24,996,990.29
- Pembesian 4,229.42 kg A.4.1.1.17 13,300.10 56,251,688.85
- Bekisting 194.75 m2 A.4.1.1.23 261,794.50 50,985,526.05
2 Beton Bertulang Balok Tipe B2
- Beton K - 275 3.83 m3 A.4.1.1.9 1,089,044.00 4,167,363.00
- Pembesian 700.58 kg A.4.1.1.17 13,300.10 9,317,837.75
- Bekisting 37.57 m2 A.4.1.1.23 261,794.50 9,835,750.26
3 Beton Bertulang Balok Tipe B3
- Beton K - 275 4.63 m3 A.4.1.1.9 1,089,044.00 5,039,224.40
- Pembesian 828.25 kg A.4.1.1.17 13,300.10 11,015,767.09
- Bekisting 57.84 m2 A.4.1.1.23 261,794.50 15,142,193.88
4 Beton Bertulang Balok Tipe B5
- Beton K - 275 1.66 m3 A.4.1.1.9 1,089,044.00 1,811,951.41
- Pembesian 298.78 kg A.4.1.1.17 13,300.10 3,973,763.75
- Bekisting 26.34 m2 A.4.1.1.23 261,794.50 6,896,583.41
5 Beton Bertulang Balok Tipe BP
- Beton K - 275 2.41 m3 A.4.1.1.9 1,089,044.00 2,624,813.85
- Pembesian 365.95 kg A.4.1.1.17 13,300.10 4,867,178.51
- Bekisting 44.19 m2 A.4.1.1.23 261,794.50 11,567,913.57

Beton Bertulang Plat


1 Beton Bertulang Plat Tipe S1
- Beton K - 275 49.27 m3 A.4.1.1.9 1,089,044.00 53,656,762.26
- Pembesian 9,057.82 kg A.4.1.1.17 13,300.10 120,469,914.60
- Bekisting 459.85 m2 A.4.1.1.24 300,872.00 138,355,868.85

Beton Bertulang Kolom


1 Beton Bertulang Kolom Tipe K.1
- Beton K - 275 14.61 m3 A.4.1.1.9 1,089,044.00 15,908,754.75
- Pembesian 3,181.20 kg A.4.1.1.17 13,300.10 42,310,227.91
- Bekisting 146.08 m2 A.4.1.1.22 252,472.00 36,881,109.76
2 Beton Bertulang Kolom Tipe KL
- Beton K - 275 1.99 m3 A.4.1.1.9 1,089,044.00 2,169,375.65
- Pembesian 432.83 kg A.4.1.1.17 13,300.10 5,756,660.66
- Bekisting 26.56 m2 A.4.1.1.22 252,472.00 6,705,656.32
3 Beton Bertulang Kolom Tipe KP
- Beton K - 175 10.98 m3 A.4.1.1.5 1,016,238.67 11,157,140.14
- Pembesian 1,097.89 kg A.4.1.1.17 13,300.10 14,601,991.09
- Bekisting 137.24 m2 A.4.1.1.22 252,472.00 34,648,178.36

Beton Bertulang Balok Separator


1 Beton Bertulang Balok Tipe BS
- Beton K - 275 0.29 m3 A.4.1.1.9 1,089,044.00 320,178.94
- Pembesian 44.75 kg A.4.1.1.17 13,300.10 595,137.28
- Bekisting 3.92 m2 A.4.1.1.23 261,794.50 1,026,234.44

Beton Bertulang Pekerjaan Tangga


1 Beton Bertulang Balok Bordes
- Beton K - 275 0.28 m3 A.4.1.1.9 1,089,044.00 304,932.32
- Pembesian 41.41 kg A.4.1.1.17 13,300.10 550,802.74
- Bekisting 2.94 m2 A.4.1.1.23 261,794.50 769,675.83
2 Beton Bertulang Kolom Bordes
- Beton K - 275 0.16 m3 A.4.1.1.9 1,089,044.00 171,524.43
- Pembesian 52.71 kg A.4.1.1.17 13,300.10 700,986.09
- Bekisting 2.31 m2 A.4.1.1.22 252,472.00 583,210.32
3 Beton Bertulang Plat Tangga
- Beton K - 275 4.00 m3 A.4.1.1.9 1,089,044.00 4,356,176.00
- Pembesian 802.55 kg A.4.1.1.17 13,300.10 10,674,051.02
- Bekisting 114.84 m2 A.4.1.1.26 238,227.00 27,357,941.03
Sub Jumlah 748,527,036.87

IV. D LANTAI ATAP


Beton Bertulang Balok
1 Beton Bertulang Balok Tipe B1
- Beton K - 275 21.30 m3 A.4.1.1.9 1,089,044.00 23,192,880.00
- Pembesian 3,926.37 kg A.4.1.1.17 13,300.10 52,221,100.35
- Bekisting 180.70 m2 A.4.1.1.23 261,794.50 47,305,742.56
2 Beton Bertulang Balok Tipe B2
- Beton K - 275 3.84 m3 A.4.1.1.9 1,089,044.00 4,177,845.05
- Pembesian 701.26 kg A.4.1.1.17 13,300.10 9,326,837.54
- Bekisting 37.67 m2 A.4.1.1.23 261,794.50 9,860,489.84
3 Beton Bertulang Balok Tipe B3
- Beton K - 275 4.65 m3 A.4.1.1.9 1,089,044.00 5,068,846.39
- Pembesian 830.49 kg A.4.1.1.17 13,300.10 11,045,621.53
- Bekisting 58.18 m2 A.4.1.1.23 261,794.50 15,231,204.01
4 Beton Bertulang Balok Tipe BP
- Beton K - 275 1.37 m3 A.4.1.1.9 1,089,044.00 1,487,198.49
- Pembesian 206.64 kg A.4.1.1.17 13,300.10 2,748,304.01
- Bekisting 25.04 m2 A.4.1.1.23 261,794.50 6,554,287.10

Beton Bertulang Plat


1 Beton Bertulang Plat Tipe S1
- Beton K - 275 31.49 m3 A.4.1.1.9 1,089,044.00 34,293,124.32
- Pembesian 5,153.05 kg A.4.1.1.17 13,300.10 68,536,081.40
- Bekisting 293.90 m2 A.4.1.1.24 300,872.00 88,426,040.10

Beton Bertulang Kolom


1 Beton Bertulang Kolom Tipe KL
- Beton K - 275 1.68 m3 A.4.1.1.9 1,089,044.00 1,829,593.92
- Pembesian 372.82 kg A.4.1.1.17 13,300.10 4,958,487.40
- Bekisting 22.40 m2 A.4.1.1.22 252,472.00 5,655,372.80

Beton Bertulang Balok


1 Beton Bertulang Balok Tipe B3
- Beton K - 275 0.59 m3 A.4.1.1.9 1,089,044.00 640,357.87
- Pembesian 89.49 kg A.4.1.1.17 13,300.10 1,190,274.57
- Bekisting 7.84 m2 A.4.1.1.23 261,794.50 2,052,468.88

Beton Bertulang Plat


1 Beton Bertulang Plat Tipe S3
- Beton K - 275 2.11 m3 A.4.1.1.9 1,089,044.00 2,300,333.19
- Pembesian 486.87 kg A.4.1.1.17 13,300.10 6,475,472.29
- Bekisting 23.23 m2 A.4.1.1.24 300,872.00 6,990,685.70
2 Finishing Waterproofing Lantai Atap 27.19 m2 Taksir 135,000.00 3,670,042.50
Sub Jumlah 415,238,691.80
JUMLAH PEKERJAAN BETON BERTULANG 2,231,554,287.27

V PEKERJAAN RANGKA BAJA & PENUTUP ATAP


V.A PEKERJAAN RANGKA ATAP & PENUTUP ATAP
1 Pekerjaaan Rangka Atap Baja Konvensional (termasuk kuda-kuda, 3,690.82 kg A.4.2.1.1 26,394.50 97,417,330.86
gording,track stang ,ikatan angin, plendes dan mur baut)
2 Pekerjaan Perakitan ( Kuda - Kuda Baja ) 3,690.82 kg A.4.2.1.3 965.80 3,564,593.31
3 Pekerjaan Gunungan :
a. Beton Bertulang Kolom Type KP
- Beton K - 175 0.11 m3 A.4.1.1.5 1,016,238.67 115,104.27
- Pembesian 11.33 kg A.4.1.1.17 13,300.10 150,643.58
- Bekisting 1.42 m2 A.4.1.1.22 252,472.00 357,453.01
b. Beton Bertulang Balok Type BP
- Beton K - 175 0.74 m3 A.4.1.1.5 1,016,238.67 749,374.39
- Pembesian 73.74 kg A.4.1.1.17 13,300.10 980,749.37
- Bekisting 9.22 m2 A.4.1.1.23 261,794.50 2,413,090.80
c. Pasangan Bata 1 PC : 3PS 12.54 m2 A.4.4.1.8 125,770.70 1,577,164.58
d. Plesteran 1 PC : 3 PS 31.10 m2 A.4.4.2.3 57,634.06 1,792,419.27
e. Acian 31.10 m2 A.4.4.2.27 32,422.50 1,008,339.75
f. Cat Eksterior 31.10 m2 A.4.7.1.10b 40,029.00 1,244,901.90
4 Pasang Penutup Atap Zincalume lengkap dengan Insulation 314.04 m2 Taksir 275,000.00 86,361,275.00
5 Pasang Nok Atap Zincalume 24.65 m' Taksir 175,000.00 4,313,750.00
Sub Jumlah 202,046,190.10

B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA
I.A LANTAI 01
Pekerjaan Pasangan Dinding
1 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 6 PS 152.96 m2 A.4.4.1.11 120,598.50 18,446,806.86
2 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 3 PS 65.55 m2 A.4.4.1.8 125,770.70 8,244,835.35
3 Plesteran bata 1 PC : 6 PS 305.92 m2 A.4.4.2.6 54,523.26 16,679,810.22
4 Plesteran bata 1 PC : 3 PS 131.11 m2 A.4.4.2.3 57,634.06 7,556,343.97
5 Acian 371.79 m2 A.4.4.2.27 32,422.50 12,054,361.28
6 Sponengan 387.30 m' A.4.4.2.20 54,704.10 21,186,897.93
7 Balok Latiu 52.14 m' A.4.1.1.29 100,741.30 5,252,651.38
8 Ring Balok 54.84 m' A.4.1.1.29 100,741.30 5,524,904.75

Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
1 Kusen Type PU1 1.00 Unit An. Kusen 1 9,496,503.50 9,496,503.50
2 Kusen Type PS 11.00 Unit An. Kusen 9 1,452,553.08 15,978,083.88
3 Kusen Type WW1 4.00 Unit An. Kusen 11 8,608,972.63 34,435,890.50
4 Kusen Type WW2 1.00 Unit An. Kusen 12 5,776,753.57 5,776,753.57
5 Kusen Type WW4 2.00 Unit An. Kusen 14 5,383,497.81 10,766,995.61
6 Kusen Type BV1 4.00 Unit An. Kusen 16 586,574.27 2,346,297.09
7 Kusen Type BV2 2.00 Unit An. Kusen 17 1,147,736.85 2,295,473.70
8 Kusen Type BV3a 5.00 Unit An. Kusen 20 1,366,354.55 6,831,772.77

I.B LANTAI 02
Pekerjaan Pasangan Dinding
1 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 6 PS 145.88 m2 A.4.4.1.11 120,598.50 17,593,331.27
2 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 3 PS 62.52 m2 A.4.4.1.8 125,770.70 7,863,372.82
3 Plesteran bata 1 PC : 6 PS 291.77 m2 A.4.4.2.6 54,523.26 15,908,088.00
4 Plesteran bata 1 PC : 3 PS 125.04 m2 A.4.4.2.3 57,634.06 7,206,735.76
5 Acian 356.43 m2 A.4.4.2.27 32,422.50 11,556,351.68
6 Sponengan 419.12 m' A.4.4.2.20 54,704.10 22,927,582.39
7 Balok Latiu 54.65 m' A.4.1.1.29 100,741.30 5,505,512.05
8 Ring Balok 55.49 m' A.4.1.1.29 100,741.30 5,590,386.59

Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
1 Kusen Type PS 11.00 Unit An. Kusen 9 1,452,553.08 15,978,083.88
2 Kusen Type WW1 5.00 Unit An. Kusen 11 8,608,972.63 43,044,863.13
3 Kusen Type WW2 1.00 Unit An. Kusen 12 5,776,753.57 5,776,753.57
4 Kusen Type WW3 2.00 Unit An. Kusen 13 3,086,941.56 6,173,883.12
5 Kusen Type WW4 2.00 Unit An. Kusen 14 5,383,497.81 10,766,995.61
6 Kusen Type WW5 1.00 Unit An. Kusen 15 7,753,698.46 7,753,698.46
7 Kusen Type BV1 3.00 Unit An. Kusen 16 586,574.27 1,759,722.81
8 Kusen Type BV2 2.00 Unit An. Kusen 17 1,147,736.85 2,295,473.70
9 Kusen Type BV3 2.00 Unit An. Kusen 18 1,454,101.07 2,908,202.15
10 Kusen Type BV3a 1.00 Unit An. Kusen 20 1,366,354.55 1,366,354.55

I.C LANTAI 03
Pekerjaan Pasangan Dinding
1 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 6 PS 1,233.82 m2 A.4.4.1.11 120,598.50 148,797,432.20
2 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 3 PS 584.78 m2 A.4.4.1.8 125,770.70 73,548,579.84
3 Plesteran bata 1 PC : 6 PS 2,467.65 m2 A.4.4.2.6 54,523.26 134,544,311.63
4 Plesteran bata 1 PC : 3 PS 1,169.57 m2 A.4.4.2.3 57,634.06 67,406,848.54
5 Acian 3,581.91 m2 A.4.4.2.27 32,422.50 116,134,606.67
6 Sponengan 869.14 m' A.4.4.2.20 54,704.10 47,545,521.47
7 Balok Latiu 100.25 m' A.4.1.1.29 100,741.30 10,099,315.33
8 Ring Balok 325.30 m' A.4.1.1.29 100,741.30 32,771,094.52

Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
3 Kusen Type P2 5.00 Unit An. Kusen 3 6,836,578.01 34,182,890.05
4 Kusen Type P3 12.00 Unit An. Kusen 4 3,185,446.84 38,225,362.03
5 Kusen Type P4 4.00 Unit An. Kusen 5 3,292,275.66 13,169,102.65
6 Kusen Type P5 1.00 Unit An. Kusen 6 3,259,682.37 3,259,682.37
7 Kusen Type P6 1.00 Unit An. Kusen 7 3,112,769.29 3,112,769.29
8 Kusen Type P.O 3.00 Unit An. Kusen 8 176,000,000.00 528,000,000.00
9 Kusen Type PS 11.00 Unit An. Kusen 9 1,452,553.08 15,978,083.88
10 Kusen Type AG 12.00 Unit An. Kusen 10 500,769.46 6,009,233.47
11 Kusen Type WW1 2.00 Unit An. Kusen 11 8,608,972.63 17,217,945.25
12 Kusen Type WW2 1.00 Unit An. Kusen 12 5,776,753.57 5,776,753.57
13 Kusen Type WW3 2.00 Unit An. Kusen 13 3,086,941.56 6,173,883.12
14 Kusen Type WW4 2.00 Unit An. Kusen 14 5,383,497.81 10,766,995.61
15 Kusen Type WW5 1.00 Unit An. Kusen 15 7,753,698.46 7,753,698.46
16 Kusen Type BV1 5.00 Unit An. Kusen 16 586,574.27 2,932,871.36
17 Kusen Type BV2 1.00 Unit An. Kusen 17 1,147,736.85 1,147,736.85
18 Kusen Type BV3 8.00 Unit An. Kusen 18 1,454,101.07 11,632,808.59
19 Kusen Type BV2a 2.00 Unit An. Kusen 19 1,092,686.11 2,185,372.22
20 Kusen Type BV3a 6.00 Unit An. Kusen 20 1,366,354.55 8,198,127.33
21 PASS BOX 3.00 Unit Taksir 33,000,000.00 99,000,000.00

I.D LANTAI ATAP


Pekerjaan Pasangan Dinding
1 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 6 PS 157.84 m2 A.4.4.1.11 120,598.50 19,034,784.85
2 Plesteran bata 1 PC : 6 PS 315.67 m2 A.4.4.2.6 54,523.26 17,211,466.53
3 Acian 315.67 m2 A.4.4.2.27 32,422.50 10,234,875.42
4 Sponengan 13.00 m' A.4.4.2.20 54,704.10 711,153.30
5 Balok Latiu 1.20 m' A.4.1.1.29 100,741.30 120,889.56
6 Ring Balok 38.00 m' A.4.1.1.29 100,741.30 3,828,169.40

Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
1 Kusen Type P3 1.00 Unit An. Kusen 4 3,185,446.84 3,185,446.84
Sub Jumlah 1,874,747,586.08

II PEKERJAAN PLAFOND
II.A LANTAI 01
1 Plafond Gypsum 9 mm finish cat rangka hollow :
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 453.80 m2 A.4.5.1.7 25,469.40
- langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm 453.80 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 453.80 m2 A.4.7.1.10 22,011.00
2 Plafond Kalsiboard 6 mm finish cat rangka hollow
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 13.43 m2 A.4.5.1.8 24,868.80
- langit-langit kalsium silikat uk. (120 x 240) cm, tebal 6 mm 13.43 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 13.43 m2 A.4.7.1.10 22,011.00
3 Pasang list plafond gipsum 377.61 m' A.4.5.1.9 15,631.00
4 Finishing Beton Ekspose
- Acian 17.24 m2 A.4.4.2.27 32,422.50
- Cat Interior 17.24 m2 A.4.7.1.10 22,011.00

II.B LANTAI 02
1 Plafond Gypsum 9 mm finish cat rangka hollow :
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 446.35 m2 A.4.5.1.7 25,469.40
- langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm 446.35 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 446.35 m2 A.4.7.1.10 22,011.00
2 Plafond Kalsiboard 6 mm finish cat rangka hollow
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 32.81 m2 A.4.5.1.8 24,868.80
- langit-langit kalsium silikat uk. (120 x 240) cm, tebal 6 mm 32.81 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 32.81 m2 A.4.7.1.10 22,011.00
3 Pasang list plafond gipsum 398.60 m' A.4.5.1.9 15,631.00
4 Finishing Beton Ekspose
- Acian 17.24 m2 A.4.4.2.27 32,422.50
- Cat Interior 17.24 m2 A.4.7.1.10 22,011.00

II.C LANTAI 03
1 Plafond Gypsum 9 mm finish cat rangka hollow :
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 470.31 m2 A.4.5.1.7 25,469.40 11,978,551.72
- langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm 470.31 m2 A.4.2.1.21 139,557.00 65,635,262.01
- Finishing Cat Plafond 470.31 m2 A.4.7.1.10 22,011.00 10,352,026.43
2 Plafond Kalsiboard 6 mm finish cat rangka hollow
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 9.51 m2 A.4.5.1.8 24,868.80 236,524.67
- langit-langit kalsium silikat uk. (120 x 240) cm, tebal 6 mm 9.51 m2 A.4.2.1.21 139,557.00 1,327,312.67
- Finishing Cat Plafond 9.51 m2 A.4.7.1.10 22,011.00 209,344.42
3 Pasang list plafond gipsum 483.69 m' A.4.5.1.9 15,631.00 7,560,542.76
4 Finishing Beton Ekspose
- Acian 17.24 m2 A.4.4.2.27 32,422.50 558,801.79
- Cat Interior 17.24 m2 A.4.7.1.10 22,011.00 379,359.59

II.D LANTAI ATAP


1 Finishing Beton Plat Ekspose :
- Acian 38.62 m2 A.4.4.2.27 32,422.50 1,252,095.35
- Finish Cat Plafond 38.62 m2 A.4.7.1.10 22,011.00 850,023.00
Sub Jumlah 100,339,844.39

III PEKERJAAN PENUTUP LANTAI DAN DINDING


III.A LANTAI 01
1 Urugan Pasir bawah Lantai 24.08 m3 A.2.3.1.11 283,140.00
2 Pekerjaan Rabat Beton 33.72 m3 A.4.1.1.4 886,773.56
3 Pasang Granite Tile ukuran 60 x 60 cm 460.28 m2 A.4.4.3.a 397,905.20
4 Pasang Keramik Lantai Unpolished ukuran 30 x 30 cm 13.43 m2 A.4.4.3.35 265,250.70
5 Pasang Plint Lantai 304.86 m' A.4.4.3.41.a 66,786.50
6 Pasang Step Nosing Tangga 36.00 m' A.4.4.3.41.d 78,124.75
7 Pasang Keramik Dinding ukuran 30 x 60 cm 65.24 m2 A.4.4.3.50.a 333,525.50
8 Pasang Border Keramik Dinding 23.30 m' A.4.4.3.41.e 77,951.50
9 Pasang Granite Alam untuk finishing Dinding Luar Lift 17.36 m2 A.4.4.3.58 1,199,279.52
10 Pasang Finishing Dinding Timbal PB 351.56 m2 Taksir 2,500,000.00

III.B LANTAI 02
1 Urugan Pasir bawah Lantai 24.68 m3 A.2.3.1.11 283,140.00
2 Pasang Granite Tile ukuran 60 x 60 cm 452.83 m2 A.4.4.3.a 397,905.20
3 Pasang Keramik Lantai Unpolished ukuran 30 x 30 cm 32.81 m2 A.4.4.3.35 265,250.70
4 Pasang Plint Lantai 331.90 m' A.4.4.3.41.a 66,786.50
5 Pasang Step Nosing Tangga 36.00 m' A.4.4.3.41.d 78,124.75
6 Pasang Keramik Dinding ukuran 30 x 60 cm 60.38 m2 A.4.4.3.50.a 333,525.50
7 Pasang Border Keramik Dinding 24.10 m' A.4.4.3.41.e 77,951.50
8 Pasang Granite Alam untuk finishing Dinding Luar Lift 17.36 m2 A.4.4.3.58 1,199,279.52

III.C LANTAI 03
1 Urugan Pasir bawah Lantai 24.71 m3 A.2.3.1.11 283,140.00 6,996,893.39
2 Pasang Granite Tile ukuran 60 x 60 cm 351.37 m2 A.4.4.3.a 397,905.20 139,813,820.28
3 Pasang Keramik Lantai Unpolished ukuran 30 x 30 cm 12.57 m2 A.4.4.3.35 265,250.70 3,334,174.77
4 Pekerjaan Pemasangan Lantai Vynil (OK 1, 2 dan 3)
- Beton Screed K - 250 12.35 m3 A.4.1.1.8 1,067,430.22 13,182,862.30
- Acian Lantai 128.65 m2 A.4.4.2.27 32,422.50 4,171,050.87
- Pasang Lantai Vynil 128.65 m2 Taksir 585,000.00 75,258,378.00
5 Pasang Plint Lantai 325.77 m' A.4.4.3.41.a 66,786.50 21,757,305.25
6 Pasang Hospital Plint 75.13 m' A.4.4.3.41.f 103,405.26 7,768,320.38
7 Pasang Keramik Dinding ukuran 30 x 60 cm 55.30 m2 A.4.4.3.50.a 333,525.50 18,444,627.20
8 Pasang Border Keramik Dinding 21.99 m' A.4.4.3.41.e 77,951.50 1,714,153.49
9 Pasang Granite Alam untuk finishing Dinding Luar Lift 17.36 m2 A.4.4.3.58 1,199,279.52 20,819,492.39
10 Pekerjaan Pemasangan Dinding Vynil 238.65 m2 Taksir 585,000.00 139,610,250.00

III.D LANTAI ATAP


1 Urugan Pasir bawah Lantai 2.56 m3 A.2.3.1.11 283,140.00 723,704.42
2 Pasang Granite Tile ukuran 60 x 60 cm 24.42 m2 A.4.4.3.a 397,905.20 9,718,317.23
5 Pasang Plint Lantai 17.13 m' A.4.4.3.41.a 66,786.50 1,143,718.81
Sub Jumlah 464,457,068.79

IV PEKERJAAN PENGECATAN
IV.A LANTAI 01
1 Cat tembok Interior 260.25 m2 A.4.7.1.10 22,011.00
2 Cat tembok Eksterior 111.54 m2 A.4.7.1.10b 40,029.00 4,464,714.57

IV.B LANTAI 02
1 Cat tembok Interior 249.50 m2 A.4.7.1.10 22,011.00
2 Cat tembok Eksterior 106.93 m2 A.4.7.1.10b 40,029.00 4,280,260.94

IV.C LANTAI 03
1 Cat tembok Interior 2,507.34 m2 A.4.7.1.10 22,011.00 55,189,056.34
2 Cat tembok Eksterior 1,074.57 m2 A.4.7.1.10b 40,029.00 43,014,130.65

IV.D LANTAI ATAP


1 Cat tembok Interior 157.84 m2 A.4.7.1.10 22,011.00 3,474,128.20
2 Cat tembok Eksterior 157.84 m2 A.4.7.1.10b 40,029.00 6,318,017.24
Sub Jumlah 116,740,307.94

V PEKERJAAN SANITAIR
V.A LANTAI 01
Pekerjaan dan Pengadaaan Peralatan Sanitasi
1 Floor drain 5.00 Unit A.5.1.1.14 45,320.00
2 Kran Air Standar 5.00 Unit A.5.1.1.19 67,325.50
4 Jet Washer 5.00 Unit Taksir 250,000.00
5 Hand Shower 5.00 Unit Taksir 1,600,000.00
6 Kloset Duduk 5.00 Unit A.5.1.1.1 2,554,200.00
14 Tempat Tissue 5.00 Unit Taksir 173,000.00
15 Gantungan Handuk 5.00 Unit Taksir 150,000.00
16 Tempat Sabun 5.00 Unit Taksir 206,000.00

V.B LANTAI 02
Pekerjaan dan Pengadaaan Peralatan Sanitasi
1 Floor drain 5.00 Unit A.5.1.1.14 45,320.00
2 Kran Air Standar 4.00 Unit A.5.1.1.19 67,325.50
3 Kran Air Panjang 2.00 Unit A.5.1.1.19.a 152,960.50
4 Jet Washer 3.00 Unit Taksir 250,000.00
5 Hand Shower 3.00 Unit Taksir 1,600,000.00
6 Kloset Duduk 1.00 Unit A.5.1.1.1 2,554,200.00
7 Kloset Jongkok 2.00 Unit A.5.1.1.2 575,487.00
9 Wastafel Meja 1.00 Unit A.5.1.1.5 549,802.00
10 Kaca Cermin 1.00 Unit Taksir 200,000.00
11 Washba Stainless 3.00 Unit A.5.1.1.12.a 322,960.00
12 Meja Beton
a. Beton K175 0.13 m3 A.4.1.1.5 1,016,238.67
b. Pembesian 12.96 kg A.4.1.1.17 13,300.10
c. Bekisting 1.62 m2 A.4.1.1.24 300,872.00
d. Finishing Granite Tile 1.89 m2 A.4.4.3.a 397,905.20
14 Tempat Tissue 3.00 Unit Taksir 173,000.00
15 Gantungan Handuk 3.00 Unit Taksir 150,000.00
16 Tempat Sabun 3.00 Unit Taksir 206,000.00
V.C LANTAI 03
Pekerjaan dan Pengadaaan Peralatan Sanitasi
1 Floor drain 2.00 Unit A.5.1.1.14 45,320.00 90,640.00
2 Kran Air Standar 4.00 Unit A.5.1.1.19 67,325.50 269,302.00
3 Jet Washer 3.00 Unit Taksir 250,000.00 750,000.00
4 Kloset Jongkok 3.00 Unit A.5.1.1.2 575,487.00 1,726,461.00
5 Tempat Tissue 3.00 Unit Taksir 173,000.00 519,000.00
6 Tempat Sabun 3.00 Unit Taksir 206,000.00 618,000.00
7 Bak Scrub station be hospital Equipment automatic sensor, 1.00 Unit Taksir 100,000,000.00 100,000,000.00
stainless steel, plat 1.2mm pipa 1.2 mm, finishing polished
dimensi 160 x 65 x 185, power suplay 250W 220 V AC 50Hz
Filtering & UV Sterilizer system, filter :1 pcs main filter 0.2 micron
UV Lamp 2 pcs 30W, acessories Aluminium Water tab, kran (2 unit)
Sub Jumlah 103,973,403.00

VI PEKERJAAN PENGADAAN RALLING , MEJA COUNTER & WALL PROTECTOR


VI.A LANTAI 01
1 Pekerjaan Ralling Tangga 31.64 m' Taksir 950,000.00
2 Pekerjaan Meja Counter :
- Pendaftaran 7.80 m' Taksir 3,500,000.00
3 Pekerjaan Wall Protector 14.39 m' Taksir 650,000.00

VI.A LANTAI 02
1 Pekerjaan Ralling Tangga 31.64 m' Taksir 950,000.00
2 Pekerjaan Meja Counter :
- Nurse Station 14.47 m' Taksir 3,500,000.00
3 Pekerjaan Wall Protector 48.76 m' Taksir 650,000.00

VIC LANTAI 03
1 Pekerjaan Ralling Tangga 31.64 m' Taksir 950,000.00 30,058,000.00
2 Pekerjaan Meja Counter :
- Administrasi 1.35 m' Taksir 3,500,000.00 4,725,000.00
Sub Jumlah 34,783,000.00

VII PEKERJAAN LAIN - LAIN


1 Pekerjaan Fasade :
a Pekerjaan Ralling Guard
- Tampak 01 54.00 m' Taksir 700,000.00 37,800,000.00
- Tampak 02 40.00 m' Taksir 700,000.00 28,000,000.00
- Tampak 04 60.00 m' Taksir 700,000.00 42,000,000.00
2 Pekerjaan Tangga Monyet R. Mesin Lift 1.00 Unit Taksir 1,500,000.00 1,500,000.00
Sub Jumlah 109,300,000.00

JUMLAH TOTAL 6,363,508,689.63


ANALISA HARGA KUSEN

NO KODE URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

XV An. Kusen HARGA SATUAN PEKERJAAN KUSEN, DAUN PINTU & JENDELA
1 An. Kusen 1 Type PU1
Kusen Alumunium 4 " powder coating 25.00 m' 143,682.51 3,592,062.73
Kaca Tempered 12 mm 7.88 m2 178,487.53 1,406,481.75
Daun Pintu Kaca Tempered 12 mm 3.87 m2 1,105,000.00 4,276,350.00
Glass Door Handle 2.00 Pasang 230,000.00 460,000.00
Floor Hinges 2.00 buah 880,000.00 1,760,000.00
Patch Fitting 4.00 buah 162,500.00 650,000.00
Patch Lock 2.00 buah 253,500.00 507,000.00
Double Cylinder 2.00 buah 97,500.00 195,000.00
Beton Bertulang Gawangan Pintu :
- Beton Bertulang 0.55 m3 3,500,000.00 7,848,350.00
Finish Granite Untuk Gawangan Pintu 11.50 m2 350,000.00 784,835.00
Sub Jumlah 8,633,185.00
Perlengkapan dan Pemasangan 863,318.50
Jumlah Total 9,496,503.50

2 An. Kusen 2 Type P1


Kusen Alumunium 4 " powder coating 9.50 m' 164,685.40 1,564,511.30
Kaca Bening tebal 5 mm 0.84 m2 172,691.75 145,061.07
Daun Pintu Double Triplek 2.52 m2 602,085.00 1,517,254.20
Kaca Bening tebal 5 mm 0.93 m2 172,691.75 160,603.33
Finishing HPL 5.04 m2 120,000.00 604,800.00
Handle + Kunci 1.00 set 155,000.00 155,000.00
Engsel Pintu 6.00 buah 36,630.00 219,780.00
Grendel tanam 2.00 buah 31,999.00 63,998.00
Door Closer 2.00 buah 334,372.50 668,745.00
Sub Jumlah 5,099,752.90
Perlengkapan dan Pemasangan 509,975.29
Jumlah Total 5,609,728.19

3 An. Kusen 3 Type P2


Kusen Alumunium 4 " powder coating 9.50 m' 164,685.40 1,564,511.30
Kaca Bening tebal 5 mm 0.09 m2 172,691.75 15,542.26
Daun Pintu Double Triplek 3.27 m2 602,085.00 1,968,817.95
Kaca Bening tebal 5 mm 0.92 m2 172,691.75 158,876.41
Finishing HPL 6.54 m2 120,000.00 784,800.00
Engsel Pintu 6.00 buah 36,630.00 219,780.00
Grendel Tanam 2.00 buah 31,999.00 63,998.00
Door Closer 2.00 buah 334,372.50 668,745.00
Pull Handle 2.00 set 260,000.00 520,000.00
Door Protector 2.00 buah 100,000.00 200,000.00
Kunci 1.00 set 50,000.00 50,000.00
Sub Jumlah 6,215,070.92
Perlengkapan dan Pemasangan 621,507.09
Jumlah Total 6,836,578.01
4 An. Kusen 4 Type P3
Kusen Alumunium 4 " powder coating 7.30 m' 164,685.40 1,202,203.42
Kaca Bening tebal 5 mm 0.48 m2 172,691.75 82,892.04
NO KODE URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

Daun Pintu Double Triplek 1.68 m2 602,085.00 1,011,502.80


Finishing HPL 3.36 m2 120,000.00
Engsel Pintu 3.00 buah 36,630.00 109,890.00
Door Closer 1.00 buah 334,372.50 334,372.50
Handle + Kunci 1.00 set 155,000.00 155,000.00
Sub Jumlah 2,895,860.76
Perlengkapan dan Pemasangan 289,586.08
Jumlah Total 3,185,446.84

5 An. Kusen 5 Type P4


Kusen Alumunium 4 " powder coating 7.38 m' 164,685.40 1,215,378.25
Kaca Bening tebal 5 mm 0.47 m2 172,691.75 81,165.12
Daun Pintu Doble Triplek 1.70 m2 602,085.00 1,023,544.50
Finishing HPL 3.40 m2 120,000.00 408,000.00
Engsel Pintu 3.00 buah 36,630.00 109,890.00
Handle + Kunci Panic Button 1.00 set 155,000.00 155,000.00
Sub Jumlah 2,992,977.87
Perlengkapan dan Pemasangan 299,297.79
Jumlah Total 3,292,275.66

6 An. Kusen 6 Type P5


Kusen Alumunium 4 " powder coating 8.30 m' 164,685.40 1,366,888.82
Kaca Bening tebal 5 mm 0.11 m2 172,691.75 18,996.09
Daun Pintu Double Triplek 2.62 m2 602,085.00 1,577,462.70
Kaca Bening tebal 5 mm 0.78 m2 172,691.75 134,699.57
Finishing HPL 5.24 m2 120,000.00 628,800.00
Engsel Pintu 6.00 buah 36,630.00 219,780.00
Grendel Tanam 2.00 buah 31,999.00 63,998.00
Door Closer 2.00 buah 334,372.50 668,745.00
Handle + Kunci 1.00 set 155,000.00 155,000.00
Sub Jumlah 2,963,347.61
Perlengkapan dan Pemasangan 296,334.76
Jumlah Total 3,259,682.37

7 An. Kusen 7 Type P6


Kusen Alumunium 4 " powder coating 8.00 m' 164,685.40 1,317,483.20
Kaca Bening tebal 5 mm 0.32 m2 172,691.75 55,261.36
Daun Pintu Double Triplek 2.42 m2 602,085.00 1,457,045.70
Finishing HPL 4.84 m2 120,000.00 580,800.00
Sub Jumlah 2,829,790.26
Perlengkapan dan Pemasangan 282,979.03
Jumlah Total 3,112,769.29

8 An. Kusen 8 Type P.O


Hermatic Door 1.00 unit 160,000,000.00 160,000,000.00

Sub Jumlah 160,000,000.00


Perlengkapan dan Pemasangan 16,000,000.00
Jumlah Total 176,000,000.00

9 An. Kusen 9 Type PS


NO KODE URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

Kusen Alumunium 4 " powder coating 4.00 m' 164,685.40 658,741.60


Daun Pintu 0.72 m2 602,085.00 433,501.20
Engsel 2.00 buah 36,630.00 73,260.00
Handle + kunci 1.00 set 155,000.00 155,000.00
Sub Jumlah 1,320,502.80
Perlengkapan dan Pemasangan 132,050.28
Jumlah Total 1,452,553.08

10 An. Kusen 10 Type AG


Kusen Alumunium 4 " powder coating 2.40 m' 164,685.40 395,244.96
Lovre tebal 1,2 mm Fin. Powder Coating 0.24 m2 250,000.00 60,000.00
Sub Jumlah 455,244.96
Perlengkapan dan Pemasangan 45,524.50
Jumlah Total 500,769.46

11 An. Kusen 11 Type WW1


Kusen Alumunium 4 " powder coating 36.89 m' 164,685.40 6,075,244.41
Kaca Bening tebal 5 mm 10.14 m2 172,691.75 1,751,094.35
Sub Jumlah 7,826,338.75
Perlengkapan dan Pemasangan 782,633.88
Jumlah Total 8,608,972.63

12 An. Kusen 12 Type WW2


Kusen Alumunium 4 " powder coating 24.80 m' 164,685.40 4,084,197.92
Kaca Bening tebal 5 mm 6.76 m2 172,691.75 1,167,396.23
Sub Jumlah 5,251,594.15
Perlengkapan dan Pemasangan 525,159.42
Jumlah Total 5,776,753.57

13 An. Kusen 13 Type WW3


Kusen Alumunium 4 " powder coating 13.58 m' 164,685.40 2,236,427.73
Kaca Bening tebal 5 mm 3.30 m2 172,691.75 569,882.78
Sub Jumlah 2,806,310.51
Perlengkapan dan Pemasangan 280,631.05
Jumlah Total 3,086,941.56

14 An. Kusen 14 Type WW4


Kusen Alumunium 4 " powder coating 23.51 m' 164,685.40 3,871,753.75
Kaca Bening tebal 5 mm 5.92 m2 172,691.75 1,022,335.16
Sub Jumlah 4,894,088.91
Perlengkapan dan Pemasangan 489,408.89
Jumlah Total 5,383,497.81

15 An. Kusen 15 Type WW5


Kusen Alumunium 4 " powder coating 33.49 m' 164,685.40 5,515,314.05
Kaca Bening tebal 5 mm 8.88 m2 172,691.75 1,533,502.74
Sub Jumlah 7,048,816.79
Perlengkapan dan Pemasangan 704,881.68
Jumlah Total 7,753,698.46

16 An. Kusen 16 Type BV1


Kusen allumunium 4 "find powder coating 2.85 m' 164,685.40 469,353.39
NO KODE URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH HARGA

Kaca Bening tebal 5 mm 0.37 m2 172,691.75 63,895.95


Sub Jumlah 533,249.34
Perlengkapan dan Pemasangan 53,324.93
Jumlah Total 586,574.27

17 An. Kusen 17 Type BV2


Kusen Alumunium 4 " powder coating 5.35 m' 164,685.40 881,066.89
Kaca Bening tebal 5 mm 0.94 m2 172,691.75 162,330.25
Sub Jumlah 1,043,397.14
Perlengkapan dan Pemasangan 104,339.71
Jumlah Total 1,147,736.85

18 An. Kusen 18 Type BV3


Kusen Alumunium 4 " powder coating 6.80 m' 164,685.40 1,119,860.72
Kaca Bening tebal 5 mm 1.17 m2 172,691.75 202,049.35
Sub Jumlah 1,321,910.07
Perlengkapan dan Pemasangan 132,191.01
Jumlah Total 1,454,101.07

19 An. Kusen 19 Type BV2a


Kusen Alumunium 4 " powder coating 5.13 m' 164,685.40 844,836.10
Kaca Bening tebal 5 mm 0.86 m2 172,691.75 148,514.91
Sub Jumlah 993,351.01
Perlengkapan dan Pemasangan 99,335.10
Jumlah Total 1,092,686.11

20 An. Kusen 20 Type BV3a


Kusen Alumunium 4 " powder coating 6.41 m' 164,685.40 1,055,633.41
Kaca Bening tebal 5 mm 1.08 m2 172,691.75 186,507.09
Sub Jumlah 1,242,140.50
Perlengkapan dan Pemasangan 124,214.05
Jumlah Total 1,366,354.55
DAFTAR HARGA SATUAN PEKERJAAN

NO. KODE URAIAN PEKERJAAN SAT HARGA SATUAN (Rp)

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 602,096.00
2 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank m' 144,705.00
3 A.2.2.1.5 Pembuatan Kantor Sementara dg Lantai Plesteran m2 1,912,746.00
4 A.2.2.1.7 Pembuatan Gudang Semen dan Peralatan m2 1,450,031.00

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m m3 64,350.00
2 A.2.3.1.2 Menggali Tanah Biasa Sedalam 2 m m3 78,705.00
3 A.2.3.1.8 MembuangTanah sejauh 30 m' m3 28,215.00
4 A.2.3.1.9 Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian m3 15,400.00
5 A.2.3.1.10 Pemadatan Tanah (per 20 cm) m3 46,200.00
6 A.2.3.1.11 Urugan Pasir m3 283,140.00
7 A.2.3.1.14 Mengurug Sirtu Padat m3 267,300.00

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.4 Pemasangan Pondasi Batu Belah 1SP : 6 PP m3 803,315.70
2 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 517,935.00

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 886,773.56
2 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 m3 1,016,238.67
3 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 m3 1,039,157.78
4 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1,055,112.67
5 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 m3 1,067,430.22
6 A.4.1.1.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53 m3 1,089,044.00
7 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 m3 1,095,612.22
8 A.4.1.1.11 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 m3 1,168,248.89
9 A.4.1.1.12 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 m3 1,177,041.56
10 A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir Kg 13,300.10
11 A.4.1.1.20 Memasang Bekisting untuk Pondasi (Asumsi 2x Pakai) m2 135,014.00
12 A.4.1.1.21 Memasang Bekisting untuk Sloof (Asumsi 2x Pakai) m2 141,889.00
13 A.4.1.1.22 Memasang Bekisting untuk Kolom (Asumsi 2x Pakai) m2 252,472.00
14 A.4.1.1.23 Memasang Bekisting untuk Balok (Asumsi 2x Pakai) m2 261,794.50
15 A.4.1.1.24 Memasang Bekisting untuk Lantai (Asumsi 2x Pakai) m2 300,872.00
16 A.4.1.1.25 Memasang Bekisting untuk Dinding (Asumsi 2x Pakai) m2 288,359.50
17 A.4.1.1.26 Memasang Bekisting untuk Tangga (Asumsi 2x Pakai) m2 238,227.00
18 A.4.1.1.28 Membuat Kolom Penguat Beton Bertulang (11 x 11) cm m' 81,679.40
19 A.4.1.1.29 Membuat Ring Balok Beton Bertulang (10 x 15) cm m' 100,741.30

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 Pemasangan Besi Profil Kg 26,394.50
2 A.4.2.1.2 Pemasangan Rangka Kuda-kuda Baja IWF Kg 26,394.50
3 A.4.2.1.3 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) 100 kg 96,580.00
4 A.4.2.1.11 Pemasangan Kusen Alumunium 4" Powder Coating m' 164,685.40
5 A.4.2.1.21 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding plafond m2 139,557.00

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.8 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP m2 125,770.70
NO. KODE URAIAN PEKERJAAN SAT HARGA SATUAN (Rp)

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


2 A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP m2 120,598.50
Pemasangan Dinding HB/CB 10, speci camp. 1SP :
3 A.4.4.1.21 m2 185,946.82
4PP

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm m2 57,634.06
2 A.4.4.2.6 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm m2 54,523.26
3 A.4.4.2.20 Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm m' 54,704.10
4 A.4.4.2.27 Pemasangan Acian m2 32,422.50

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.a Pasang Granite Tile 60 x 60 cm ( Polished ) m2 397,905.20
2 A.4.4.3.b Pasang Keramik 60 x 60 cm ( polished ) m2 322,830.20
3 A.4.4.3.35 Pemasangan Lantai Keramik 30 x 30 cm (Unpolished) m2 265,250.70
4 A.4.4.3.41.a Pemasangan Plin Lantai Granite Uk. 10 x 60 cm m' 66,786.50
5 A.4.4.3.41.b Pemasangan Plin Keramik Uk. 10 x 60 cm m' 63,290.48
6 A.4.4.3.41.c Pemasangan Plint Alumunium m' 104,995.00
7 A.4.4.3.41.d Pemasangan Step Nosing Tangga Uk. 10 x 60 cm m' 78,124.75
8 A.4.4.3.41.e Pemasangan Border Keramik Dinding 10 x 30 m' 77,951.50
9 A.4.4.3.50.a Pemasangan Dinding Keramik 30 x 60 cm, m2 333,525.50
10 A.4.4.3.41.f Pemasangan Hospital Plint m' 103,405.26
11 A.4.4.3.58 Pemasangan Dinding Granite Alam m2 1,199,279.52
12 A.4.4.3.58.b Pemasangan Dinding Batu Paros / Batu Tempel Hitam m2 267,487.00

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.7 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm m2 25,469.40
2 A.4.5.1.8 Memasang Langit-langit Kalsium Silikat Board, Ukuran (120x240) tebal 6 mm m2 24,868.80
3 A.4.5.1.9 List Langit-Langit Gypsum m1 15,631.00

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.2 Pemasangan Atap Genteng Kodok / Glasur m2 139,722.00
2 A.4.5.2.5 Pemasangan Genteng Bubung Kodok / Glasur m' 122,016.40

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.5 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II m2 858,137.50
2 A.4.6.1.6 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II m2 602,085.00
3 A.4.6.1.21 Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II m' 151,195.00
4 A.4.6.1.22 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II m' 152,570.00

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa Buah 222,420.00
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi Buah 160,710.00
3 A.4.6.2.4 Pemasangan Kunci Selinder Buah 221,210.00
4 A.4.6.2.5 Pemasangan Engsel Pintu Buah 36,630.00
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu Buah 30,470.00
6 A.4.6.2.7 Pemasangan Engsel Angin Buah 48,449.50
7 A.4.6.2.9 Pemasangan Kait Angin Buah 30,629.50
8 A.4.6.2.10 Pasang Door Closer Buah 334,372.50
9 A.4.6.2.11 Pemasangan Kunci Selot Buah 31,999.00
10 A.4.6.2.13 Pemasangan Door Stop Buah 286,874.50
11 A.4.6.2.16 Pemasangan Kaca Bening tebal 3 mm m2 117,031.75
NO. KODE URAIAN PEKERJAAN SAT HARGA SATUAN (Rp)

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


12 A.4.6.2.17 Pemasangan Kaca Bening tebal 5 mm m2 172,691.75

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.10 Pengecat Tembok Baru (Interior) m2 22,011.00
2 A.4.7.1.10b Pengecat Tembok Baru (Eksterior) m2 40,029.00
3 A.4.7.1.4 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 40,656.00

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Pemasangan Closet Duduk / Mono Blok Unit 2,554,200.00
2 A.5.1.1.2 Pemasangan Closet Jongkok Porselen Unit 575,487.00
3 A.5.1.1.5 Pemasangan Wastafel Unit 549,802.00
4 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless Stell buah 339,460.00
5 A.5.1.1.12.a PemasanganSink Stainless Stell Standar buah 322,960.00
6 A.5.1.1.14 Pemasangan Floor Drain buah 45,320.00
7 A.5.1.1.19 Pemasangan Kran Ø ½" atau Ø ¾" bh 67,325.50
8 A.5.1.1.19.a Pemasangan Kran Tangkai Panjang bh 152,960.50
9 A.5.1.1.19.b Pemasangan Kran Tangkai Putar bh 152,960.50
10 A.5.1.1.25 Pemasangan Pipa PVC tipe AW Ø ½" m' 18,719.25
11 A.5.1.1.26 Pemasangan Pipa PVC tipe AW Ø ¾" m' 21,276.75
12 A.5.1.1.27 Pemasangan Pipa PVC tipe AW Ø 1" m' 28,523.00
13 A.5.1.1.28 Pemasangan Pipa PVC tipe AW Ø 1½" m' 26,871.17
14 A.5.1.1.29 Pemasangan Pipa PVC tipe AW Ø 2" m' 30,281.17
15 A.5.1.1.31 Pemasangan Pipa PVC tipe AW Ø 3" m' 47,219.33

XV An. Kusen HARGA SATUAN PEKERJAAN KUSEN, DAUN PINTU & JENDELA
1 An. Kusen 1 Pemasangan & Pembuatan Kusen Type PU1 Unit 9,496,503.50
2 An. Kusen 2 Pemasangan & Pembuatan Kusen Type P1 Unit 5,609,728.19
3 An. Kusen 3 Pemasangan & Pembuatan Kusen Type P2 Unit 6,836,578.01
4 An. Kusen 4 Pemasangan & Pembuatan Kusen Type P3 Unit 3,185,446.84
5 An. Kusen 5 Pemasangan & Pembuatan Kusen Type P4 Unit 3,292,275.66
6 An. Kusen 6 Pemasangan & Pembuatan Kusen Type P5 Unit 3,259,682.37
7 An. Kusen 7 Pemasangan & Pembuatan Kusen Type P6 Unit 3,112,769.29
8 An. Kusen 8 Pemasangan & Pembuatan Kusen Type P.O Unit 176,000,000.00
9 An. Kusen 9 Pemasangan & Pembuatan Kusen Type PS Unit 1,452,553.08
10 An. Kusen 10 Pemasangan & Pembuatan Kusen Type AG Unit 500,769.46
11 An. Kusen 11 Pemasangan & Pembuatan Kusen Type WW1 Unit 8,608,972.63
12 An. Kusen 12 Pemasangan & Pembuatan Kusen Type WW2 Unit 5,776,753.57
13 An. Kusen 13 Pemasangan & Pembuatan Kusen Type WW3 Unit 3,086,941.56
14 An. Kusen 14 Pemasangan & Pembuatan Kusen Type WW4 Unit 5,383,497.81
15 An. Kusen 15 Pemasangan & Pembuatan Kusen Type WW5 Unit 7,753,698.46
16 An. Kusen 16 Pemasangan & Pembuatan Kusen Type BV1 Unit 586,574.27
17 An. Kusen 17 Pemasangan & Pembuatan Kusen Type BV2 Unit 1,147,736.85
18 An. Kusen 18 Pemasangan & Pembuatan Kusen Type BV3 Unit 1,454,101.07
19 An. Kusen 19 Pemasangan & Pembuatan Kusen Type BV2a Unit 1,092,686.11
20 An. Kusen 20 Pemasangan & Pembuatan Kusen Type BV3a Unit 1,366,354.55
ANALISA HARGA SATUAN PEKERJAAN (AHSP)

KOD HARGA SATUAN


No. SNI KOEF SAT. URAIAN PEKERJAAN JUMLAH HARGA Rp)
E (Rp)

I A. 2.2.1 K.3 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 1.000 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 602,096.00
A TENAGA 54,800.00
L.01 0.200 OH Pekerja 75,000.00 15,000.00
L.02 0.400 OH Tukang Kayu 90,000.00 36,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.020 OH Mandor 90,000.00 1,800.00
B BAHAN 492,560.00
1.250 Btg Kayu Dolken diameter 8 - 10 / 400 cm 22,000.00 27,500.00
2.500 Kg Portalnd Semen 1,100.00 2,750.00
1.200 Lbr Seng Gelombang 3" - 5" 30,000.00 36,000.00
0.005 m3 Pasir Beton 392,000.00 1,960.00
0.009 m3 Koral Beton 250,000.00 2,250.00
0.072 m3 Kayu 5/7X4m Kayu Kruing 5,650,000.00 406,800.00
0.060 Kg Paku Biasa 2" - 5" 15,000.00 900.00
0.450 Kg Meni Besi 32,000.00 14,400.00
C PERALATAN
D Jumlah A + B + C 547,360.00
E Overhead & Profit 10% 54,736.00
F Harga Satuan Pekerjaan (D+E) 602,096.00

2 A.2.2.1.4 1.000 m' Pengukuran dan Pemasangan Bouwplank 144,705.00


A Tenaga 17,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.100 OH Tukang Kayu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 113,600.00
0.012 m3 Kayu 5/7x 4m Kayu Kruing 5,650,000.00 67,800.00
0.020 Kg Paku Biasa 2" - 5" 15,000.00 300.00
0.007 m3 Kayu Papan 3/20 Kruing 6,500,000.00 45,500.00
C PERALATAN
D Jumlah A + B + C 131,550.00
E Overhead & Profit 10% 13,155.00
F Harga Satuan Pekerjaan (D+E) 144,705.00

3 A.2.2.1.5 K.3 1.000 m2 Pembuatan Kantor Sementara dg Lantai Plesteran 1,912,746.00


A Tenaga 454,500.00
L.01 2.000 OH Pekerja 75,000.00 150,000.00
L.02 2.000 OH Tukang Kayu 90,000.00 180,000.00
L.02 1.000 OH Tukang Batu 90,000.00 90,000.00
L.03 0.300 OH Kepala Tukang 100,000.00 30,000.00
L.04 0.050 OH Mandor 90,000.00 4,500.00
B Bahan 1,284,360.00
1.250 Btg Kayu Dolken Ø 8 - 10 / 4 m 22,000.00 27,500.00
0.180 m3 Kayu 5,650,000.00 1,017,000.00
0.800 Kg Paku Biasa 2" - 5" 15,000.00 12,000.00
1.100 Kg Besi Strip 13,000.00 14,300.00
35.000 Kg Portland Sement 1,100.00 38,500.00
0.150 m3 Pasir pasang 217,000.00 32,550.00
0.100 m3 Pasir Beton 392,000.00 39,200.00
0.150 m3 Koral Beton 250,000.00 37,500.00
30.000 buah Batu bata Merah 800.00 24,000.00
0.250 Lbr Seng Plat 36,000.00 9,000.00
0.200 buah Jendela Naco 15,000.00 3,000.00
0.080 m2 Kaca Polos 82,000.00 6,560.00
0.150 buah Kunci Tanam 155,000.00 23,250.00
C PERALATAN
D Jumlah A + B + C 1,738,860.00
E Overhead & Profit 10% 173,886.00
F Harga Satuan Pekerjaan (D+E) 1,912,746.00

4 A.2.2.1.7 K.3 1.000 m2 Pembuatan Gudang Semen dan Peralatan 1,450,031.00


A Tenaga 279,500.00
L.01 1.000 OH Pekerja 75,000.00 75,000.00
L.02 2.000 OH Tukang Kayu 90,000.00 180,000.00
L.03 0.200 OH Kepala Tukang 100,000.00 20,000.00
L.04 0.050 OH Mandor 90,000.00 4,500.00
B Bahan 1,309,210.00
1.700 Btg Kayu Dolken diameter 8 - 10 / 400 cm 22,000.00 37,400.00
0.210 m3 Kayu 5,650,000.00 1,186,500.00
0.300 Kg Paku Biasa 2" - 5" 15,000.00 4,500.00
10.500 Kg Portland Semen 1,100.00 11,550.00
0.030 m3 Pasir Beton 392,000.00 11,760.00
0.050 m3 Koral Beton 250,000.00 12,500.00
1.500 Lbr Seng Gelombang 30,000.00 45,000.00
0.250 Lbr Seng Plat 36,000.00 9,000.00
C PERALATAN
D Jumlah A + B + C 1,318,210.00
E Overhead & Profit 10% 131,821.00
F Harga Satuan Pekerjaan (D+E) 1,450,031.00

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 1.000 m3 Menggali Tanah Biasa Sedalam 1 m 64,350.00
A TENAGA 58,500.00
L.01 0.750 OH Pekerja 75,000.00 56,250.00
L.04 0.025 OH Mandor 90,000.00 2,250.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 58,500.00
E Overhead & Profit 10% 5,850.00
F Harga Satuan Pekerjaan (D+E) 64,350.00

2 A.2.3.1.2 1.000 m3 Menggali Tanah Biasa Sedalam 2 m 78,705.00


A TENAGA 71,550.00
L.01 0.900 OH Pekerja 75,000.00 67,500.00
L.04 0.045 OH Mandor 90,000.00 4,050.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 71,550.00
E Overhead & Profit 10% 7,155.00
F Harga Satuan Pekerjaan (D+E) 78,705.00

3 A.2.3.1.8 1.000 m3 MembuangTanah sejauh 30 m' 28,215.00


A TENAGA 25,650.00
L.01 0.330 OH Pekerja 75,000.00 24,750.00
L.04 0.010 OH Mandor 90,000.00 900.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 25,650.00
E Overhead & Profit 10% 2,565.00
F Harga Satuan Pekerjaan (D+E) 28,215.00

4 A.2.3.1.9 1.000
m3 Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian 15,400.00

A TENAGA 42,000.00
L.01 0.500 OH Pekerja 75,000.00 37,500.00
L.04 0.050 OH Mandor 90,000.00 4,500.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 42,000.00
E Overhead & Profit 10% 4,200.00
F Harga Satuan Pekerjaan (D+E) 46,200.00

5 A.2.3.1.10 1.000 m3 Pemadatan Tanah (per 20 cm) 46,200.00


A TENAGA 42,000.00
L.01 0.500 OH Pekerja 75,000.00 37,500.00
L.04 0.050 OH Mandor 90,000.00 4,500.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 42,000.00
E Overhead & Profit 10% 4,200.00
F Harga Satuan Pekerjaan (D+E) 46,200.00

6 A.2.3.1.11 1.000 m3 Urugan Pasir 283,140.00


A TENAGA 23,400.00
L.01 0.300 OH Pekerja 75,000.00 22,500.00
L.04 0.010 OH Mandor 90,000.00 900.00
B BAHAN 234,000.00
1.200 m3 Pasir Urug 195,000.00 234,000.00
C PERALATAN
D Jumlah A + B + C 257,400.00
E Overhead & Profit 10% 25,740.00
F Harga Satuan Pekerjaan (D+E) 283,140.00

7 A.2.3.1.14 1.000 m3 Mengurug Sirtu Padat 267,300.00


A TENAGA 21,000.00
0.250 OH Pekerja 75,000.00 18,750.00
0.025 OH Mandor 90,000.00 2,250.00
B BAHAN 222,000.00
1.200 m3 Sirtu 185,000.00 222,000.00
C PERALATAN
D Jumlah A + B + C 243,000.00
E Overhead & Profit 10% 24,300.00
F Harga Satuan Pekerjaan (D+E) 267,300.00

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.4 1.000 m3 Pemasangan Pondasi Batu Belah 1SP : 6 PP 803,315.70
A TENAGA 194,250.00
1.500 OH Pekerja 75,000.00 112,500.00
0.750 OH Tukang Batu 90,000.00 67,500.00
0.075 OH Kepala Tukang 100,000.00 7,500.00
0.075 OH Mandor 90,000.00 6,750.00
B BAHAN 536,037.00
1.200 m3 Batu Belah 15/20 238,000.00 285,600.00
117.000 Kg Portland Sement 1,100.00 128,700.00
0.561 m3 Pasir pasang 217,000.00 121,737.00
C PERALATAN
D Jumlah A + B + C 730,287.00
E Overhead & Profit 10% 73,028.70
F Harga Satuan Pekerjaan (D+E) 803,315.70

2 A.3.2.1.9 1.000 m3 Pemasang Batu Kosong/Anstamping 517,935.00


A Tenaga 101,010.00
0.780 OH Pekerja 75,000.00 58,500.00
0.390 OH Tukang Batu 90,000.00 35,100.00
0.039 OH Kepala Tukang 100,000.00 3,900.00
0.039 OH Mandor 90,000.00 3,510.00
B Bahan 369,840.00
1.200 m3 Batu Belah 15/20 238,000.00 285,600.00
0.432 m3 Pasir Urug 195,000.00 84,240.00
C PERALATAN
D Jumlah A + B + C 470,850.00
E Overhead & Profit 10% 47,085.00
F Harga Satuan Pekerjaan (D+E) 517,935.00

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.4 1.000 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0 886,773.56
A Tenaga 110,540.00
L.01 1.200 OH Pekerja 75,000.00 90,000.00
L.02 0.200 OH Tukang Batu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.006 OH Mandor 90,000.00 540.00
B Bahan 695,617.78
230.000 Kg Portland Semen 1,100.00 253,000.00
893.000 kg Pasir Beton 280.00 250,040.00
1,027.000 kg Kriss / Split 177.78 182,577.78
200.000 ltr Air 50.00 10,000.00
C PERALATAN
D Jumlah A + B + C 806,157.78
E Overhead & Profit 10% 80,615.78
F Harga Satuan Pekerjaan (D+E) 886,773.56

2 A.4.1.1.5 1.000 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 1,016,238.67
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 765,083.33
326.000 Kg Portland Semen 1,100.00 358,600.00
760.000 Kg Pasir Beton 280.00 212,800.00
1,029.000 Kg Kriss / Split 177.78 182,933.33
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 923,853.33
E Overhead & Profit 10% 92,385.33
F Harga Satuan Pekerjaan (D+E) 1,016,238.67

3 A.4.1.1.6 1.000 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 1,039,157.78
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 785,918.89
352.000 Kg Portland Semen 1,100.00 387,200.00
731.000 Kg Pasir Beton 280.00 204,680.00
1,031.000 Kg Kriss / Split 177.78 183,288.89
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 944,688.89
E Overhead & Profit 10% 94,468.89
F Harga Satuan Pekerjaan (D+E) 1,039,157.78

4 A.4.1.1.7 1.000 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,055,112.67
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 800,423.33
371.000 Kg Portland Semen 1,100.00 408,100.00
698.000 Kg Pasir Beton 280.00 195,440.00
1,047.000 Kg Kriss / Split 177.78 186,133.33
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 959,193.33
E Overhead & Profit 10% 95,919.33
F Harga Satuan Pekerjaan (D+E) 1,055,112.67

5 A.4.1.1.8 1.000 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1,067,430.22
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 811,621.11
384.000 Kg Portland Semen 1,100.00 422,400.00
692.000 Kg Pasir Beton 280.00 193,760.00
1,039.000 Kg Kriss / Split 177.78 184,711.11
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 970,391.11
E Overhead & Profit 10% 97,039.11
F Harga Satuan Pekerjaan (D+E) 1,067,430.22

6 A.4.1.1.9 1.000 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c 1,089,044.00
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 831,270.00
406.000 Kg Portland Semen 1,100.00 446,600.00
684.000 kg Pasir Beton 280.00 191,520.00
1,026.000 kg Kriss / Split 177.78 182,400.00
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 990,040.00
E Overhead & Profit 10% 99,004.00
F Harga Satuan Pekerjaan (D+E) 1,089,044.00

7 A.4.1.1.10 1.000 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 1,095,612.22
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 837,241.11
413.000 Kg Portland Semen 1,100.00 454,300.00
681.000 Kg Pasir Beton 280.00 190,680.00
1,021.000 Kg Kriss / Split 177.78 181,511.11
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 996,011.11
E Overhead & Profit 10% 99,601.11
F Harga Satuan Pekerjaan (D+E) 1,095,612.22

8 A.4.1.1.11 1.000 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 1,168,248.89
A Tenaga 201,950.00
L.01 2.100 OH Pekerja 75,000.00 157,500.00
L.02 0.350 OH Tukang Batu 90,000.00 31,500.00
L.03 0.035 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.105 OH Mandor 90,000.00 9,450.00
B Bahan 860,094.44
439.000 Kg Portland Semen 1,100.00 482,900.00
670.000 Kg Pasir Beton 280.00 187,600.00
1,006.000 Kg Kriss / Split 177.78 178,844.44
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 1,062,044.44
E Overhead & Profit 10% 106,204.44
F Harga Satuan Pekerjaan (D+E) 1,168,248.89

9 A.4.1.1.12 1.000 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,177,041.56
A Tenaga 201,950.00
L.01 2.100 OH Pekerja 75,000.00 157,500.00
L.02 0.350 OH Tukang Batu 90,000.00 31,500.00
L.03 0.035 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.105 OH Mandor 90,000.00 9,450.00
B Bahan 868,087.78
448.000 Kg Portland Semen 1,100.00 492,800.00
667.000 Kg Pasir Beton 280.00 186,760.00
1,000.000 Kg Kriss / Split 177.78 177,777.78
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 1,070,037.78
E Overhead & Profit 10% 107,003.78
F Harga Satuan Pekerjaan (D+E) 1,177,041.56

10 A.4.1.1.17 10.000 Kg Pembesian dg Besi Polos atau Besi Ulir 133,001.00


A Tenaga 12,610.00
L.01 0.070 OH Pekerja 75,000.00 5,250.00
L.02 0.070 OH Tukang Besi 90,000.00 6,300.00
L.03 0.007 OH Kepala Tukang 100,000.00 700.00
L.04 0.004 OH Mandor 90,000.00 360.00
B Bahan 108,300.00
10.500 Kg Besi Beton (polos/ulir) 10,000.00 105,000.00
0.150 Kg Kawat Beton 22,000.00 3,300.00
C PERALATAN
D Jumlah A + B + C 120,910.00
E Overhead & Profit 10% 12,091.00
F Harga Satuan Pekerjaan (D+E) 133,001.00

11 A.4.1.1.20 1.000 m2 Memasang Bekisting untuk Pondasi (Asumsi 2x Pakai) 135,014.00


A Tenaga 67,340.00
L.01 0.520 OH Pekerja 75,000.00 39,000.00
L.02 0.260 OH Tukang Kayu 90,000.00 23,400.00
L.03 0.026 OH Kepala Tukang 100,000.00 2,600.00
L.04 0.026 OH Mandor 90,000.00 2,340.00
B Bahan 55,400.00
0.020 m3 Kayu Klas III (Terentang) 2,500,000.00 50,000.00
0.300 Kg Paku Biasa 2" - 5" 15,000.00 4,500.00
0.100 Ltr Minyak Bekisting 9,000.00 900.00
C PERALATAN
D Jumlah A + B + C 122,740.00
E Overhead & Profit 10% 12,274.00
F Harga Satuan Pekerjaan (D+E) 135,014.00

12 A.4.1.1.21 1.000 m2 Memasang Bekisting untuk Sloof (Asumsi 2x Pakai) 141,889.00


A Tenaga 67,340.00
L.01 0.520 OH Pekerja 75,000.00 39,000.00
L.02 0.260 OH Tukang Kayu 90,000.00 23,400.00
L.03 0.026 OH Kepala Tukang 100,000.00 2,600.00
L.04 0.026 OH Mandor 90,000.00 2,340.00
B Bahan 61,650.00
0.023 m3 Kayu Klas III (Terentang) 2,500,000.00 56,250.00
0.300 Kg Paku Biasa 2" - 5" 15,000.00 4,500.00
0.100 Ltr Minyak Bekisting 9,000.00 900.00
C PERALATAN
D Jumlah A + B + C 128,990.00
E Overhead & Profit 10% 12,899.00
F Harga Satuan Pekerjaan (D+E) 141,889.00

13 A.4.1.1.22 1.000 m2 Memasang Bekisting untuk Kolom (Asumsi 2x Pakai) 252,472.00


A Tenaga 85,470.00
L.01 0.660 OH Pekerja 75,000.00 49,500.00
L.02 0.330 OH Tukang Kayu 90,000.00 29,700.00
L.03 0.033 OH Kepala Tukang 100,000.00 3,300.00
L.04 0.033 OH Mandor 90,000.00 2,970.00
B Bahan 144,050.00
0.020 m3 Kayu Klas III (Terentang) 2,500,000.00 50,000.00
0.400 Kg Paku Biasa 2" - 5" 15,000.00 6,000.00
0.200 Ltr Minyak Bekisting 9,000.00 1,800.00
0.008 m3 Balok Kayu Klas II 5,650,000.00 42,375.00
0.175 Lbr Plywood tebal 9mm 125,000.00 21,875.00
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 22,000.00
C PERALATAN
D Jumlah A + B + C 229,520.00
E Overhead & Profit 10% 22,952.00
F Harga Satuan Pekerjaan (D+E) 252,472.00

14 A.4.1.1.23 1.000 m2 Memasang Bekisting untuk Balok (Asumsi 2x Pakai) 261,794.50


A Tenaga 85,470.00
L.01 0.660 OH Pekerja 75,000.00 49,500.00
L.02 0.330 OH Tukang Kayu 90,000.00 29,700.00
L.03 0.033 OH Kepala Tukang 100,000.00 3,300.00
L.04 0.033 OH Mandor 90,000.00 2,970.00
B Bahan 152,525.00
0.020 m3 Kayu Klas III (Terentang) 2,500,000.00 50,000.00
0.400 Kg Paku Biasa 2" - 5" 15,000.00 6,000.00
0.200 Ltr Minyak Bekisting 9,000.00 1,800.00
0.009 m3 Balok Kayu Klas II 5,650,000.00 50,850.00
0.175 Lbr Plywood tebal 9mm 125,000.00 21,875.00
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 22,000.00
C PERALATAN
D Jumlah A + B + C 237,995.00
E Overhead & Profit 10% 23,799.50
F Harga Satuan Pekerjaan (D+E) 261,794.50

15 A.4.1.1.24 1.000 m2 Memasang Bekisting untuk Lantai (Asumsi 2x Pakai) 300,872.00


A Tenaga 85,470.00
L.01 0.660 OH Pekerja 75,000.00 49,500.00
L.02 0.330 OH Tukang Kayu 90,000.00 29,700.00
L.03 0.033 OH Kepala Tukang 100,000.00 3,300.00
L.04 0.033 OH Mandor 90,000.00 2,970.00
B Bahan 188,050.00
0.020 m3 Kayu Klas III (Terentang) 2,500,000.00 50,000.00
0.400 Kg Paku Biasa 2" - 5" 15,000.00 6,000.00
0.200 Ltr Minyak Bekisting 9,000.00 1,800.00
0.008 m3 Balok Kayu Klas II (Borneo) 5,650,000.00 42,375.00
0.175 Lbr Plywood tebal 9mm 125,000.00 21,875.00
3.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 66,000.00
C PERALATAN
D Jumlah A + B + C 273,520.00
E Overhead & Profit 10% 27,352.00
F Harga Satuan Pekerjaan (D+E) 300,872.00

16 A.4.1.1.25 1.000 m2 Memasang Bekisting untuk Dinding (Asumsi 2x Pakai) 288,359.50


A Tenaga 85,470.00
L.01 0.660 OH Pekerja 75,000.00 49,500.00
L.02 0.330 OH Tukang Kayu 90,000.00 29,700.00
L.03 0.033 OH Kepala Tukang 100,000.00 3,300.00
L.04 0.033 OH Mandor 90,000.00 2,970.00
B Bahan 176,675.00
0.015 m3 Kayu Klas III (Terentang) 2,500,000.00 37,500.00
0.400 Kg Paku Biasa 2" - 5" 15,000.00 6,000.00
0.200 Ltr Minyak Bekisting 9,000.00 1,800.00
0.010 m3 Balok Kayu Klas II 5,650,000.00 56,500.00
0.175 Lbr Plywood tebal 9mm 125,000.00 21,875.00
1.500 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 33,000.00
4.000 Buah Formite/Penjaga jarak / Spacer (alat bantu) 5,000.00 20,000.00
C PERALATAN
D Jumlah A + B + C 262,145.00
E Overhead & Profit 10% 26,214.50
F Harga Satuan Pekerjaan (D+E) 288,359.50
17 A.4.1.1.26 1.000 m2 Memasang Bekisting untuk Tangga (Asumsi 2x Pakai) 238,227.00
A Tenaga 85,470.00
L.01 0.660 OH Pekerja 75,000.00 49,500.00
L.02 0.330 OH Tukang Kayu 90,000.00 29,700.00
L.03 0.033 OH Kepala Tukang 100,000.00 3,300.00
L.04 0.033 OH Mandor 90,000.00 2,970.00
B Bahan 131,100.00
0.015 m3 Kayu Klas III (Terentang) 2,500,000.00 37,500.00
0.400 Kg Paku Biasa 2" - 5" 15,000.00 6,000.00
0.150 Ltr Minyak Bekisting 9,000.00 1,350.00
0.008 m3 Balok Kayu Klas II 5,650,000.00 42,375.00
0.175 Lbr Plywood tebal 9mm 125,000.00 21,875.00
1.000 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 22,000.00 22,000.00
C PERALATAN
D Jumlah A + B + C 216,570.00
E Overhead & Profit 10% 21,657.00
F Harga Satuan Pekerjaan (D+E) 238,227.00

18 A.4.1.1.28 1.000 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 81,679.40
A Tenaga 20,310.00
L.01 0.180 OH Pekerja 75,000.00 13,500.00
L.02 0.020 OH Tukang batu 90,000.00 1,800.00
L.02 0.020 OH Tukang Kayu 90,000.00 1,800.00
L.02 0.020 OH Tukang Besi 90,000.00 1,800.00
L.03 0.006 OH Kepala Tukang 100,000.00 600.00
L.04 0.009 OH Mandor 90,000.00 810.00
B Bahan 53,944.00
0.002 m3 Kayu Klas III 2,500,000.00 5,000.00
0.010 Kg Paku Biasa 2" - 5" 15,000.00 150.00
3.000 Kg Besi Beton Polos 10,000.00 30,000.00
0.450 Kg Kawat Beton 22,000.00 9,900.00
4.000 Kg Portland Semen 1,100.00 4,400.00
0.006 m3 Pasir Beton 392,000.00 2,352.00
0.009 m3 Kerikil 238,000.00 2,142.00
C PERALATAN
D Jumlah A + B + C 74,254.00
E Overhead & Profit 10% 7,425.40
F Harga Satuan Pekerjaan (D+E) 81,679.40

19 A.4.1.1.29 1.000 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm 100,741.30
A Tenaga 33,535.00
L.01 0.297 OH Pekerja 75,000.00 22,275.00
L.02 0.033 OH Tukang batu 90,000.00 2,970.00
L.02 0.033 OH Tukang Kayu 90,000.00 2,970.00
L.02 0.033 OH Tukang Besi 90,000.00 2,970.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 58,048.00
0.003 m3 Kayu Klas III 2,500,000.00 7,500.00
0.020 Kg Paku Biasa 2" - 5" 15,000.00 300.00
3.600 Kg Besi Beton Polos 10,000.00 36,000.00
0.050 Kg Kawat Beton 22,000.00 1,100.00
5.500 Kg Portland Semen 1,100.00 6,050.00
0.009 m3 Pasir Beton 392,000.00 3,528.00
0.015 m3 Kerikil 238,000.00 3,570.00
C PERALATAN
D Jumlah A + B + C 91,583.00
E Overhead & Profit 10% 9,158.30
F Harga Satuan Pekerjaan (D+E) 100,741.30

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 1.000 Kg Pemasangan Besi Profil 26,394.50
A Tenaga 10,770.00
L.01 0.060 OH Pekerja 75,000.00 4,500.00
L.02 0.060 OH Tukang Besi 90,000.00 5,400.00
L.03 0.006 OH Kepala Tukang 100,000.00 600.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 13,225.00
1.150 Kg Besi Profil 11,500.00 13,225.00
C PERALATAN
D Jumlah A + B + C 23,995.00
E Overhead & Profit 10% 2,399.50
F Harga Satuan Pekerjaan (D+E) 26,394.50

2 A.4.2.1.2 1.000 Kg Pemasangan Rangka Kuda-kuda Baja IWF 26,394.50


A Tenaga 10,770.00
L.01 0.060 OH Pekerja 75,000.00 4,500.00
L.02 0.060 OH Tukang Besi 90,000.00 5,400.00
L.03 0.006 OH Kepala Tukang 100,000.00 600.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 13,225.00
1.150 kg Besi Baja IWF 11,500.00 13,225.00
C PERALATAN
D Jumlah A + B + C 23,995.00
E Overhead & Profit 10% 2,399.50
F Harga Satuan Pekerjaan (D+E) 26,394.50

3 A.4.2.1.3 100.000 kg Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) 96,580.00


A Tenaga 17,050.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.100 OH Tukang Besi 90,000.00 9,000.00
L.03 0.001 OH Kepala Tukang 100,000.00 100.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 10,750.00
1.000 ltr Solar 7,000.00 7,000.00
0.100 ltr Minyak Pelumas 37,500.00 3,750.00
C PERALATAN 60,000
0.800 jam Sewa Alat 75,000.00 60,000
D Jumlah A + B + C 87,800.00
E Overhead & Profit 10% 8,780.00
F Harga Satuan Pekerjaan (D+E) 96,580.00

4 A.4.2.1.11 1.000 m' Pemasangan Kusen Alumunium 4" Powder Coating 164,685.40
A Tenaga 7,714.00
L.01 0.043 OH Pekerja 75,000.00 3,225.00
L.02 0.043 OH Tukang Besi 90,000.00 3,870.00
L.03 0.004 OH Kepala Tukang 100,000.00 430.00
L.04 0.002 OH Mandor 90,000.00 189.00
B Bahan 142,000.00
1.100 m' Profil Aluminium 125,000.00 137,500.00
2.000 buah Skrup Fixer 750.00 1,500.00
0.060 Tube Sealant 50,000.00 3,000.00
C PERALATAN
D Jumlah A + B + C 149,714.00
E Overhead & Profit 10% 14,971.40
F Harga Satuan Pekerjaan (D+E) 164,685.40

5 A.4.2.1.21 1.000 m2 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding pl 139,557.00
A Tenaga 62,870.00
L.01 0.350 OH Pekerja 75,000.00 26,250.00
L.02 0.350 OH Tukang Besi 90,000.00 31,500.00
L.03 0.035 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.018 OH Mandor 90,000.00 1,620.00
B Bahan 64,000.00
4.000 m' Rangka metal hollow 40.40.2 mm 8,000.00 32,000.00
1.000 **) Assesoris (perkuatan; las dll) 32,000.00 32,000.00
**) 100% x rangka
C PERALATAN
D Jumlah A + B + C 126,870.00
E Overhead & Profit 10% 12,687.00
F Harga Satuan Pekerjaan (D+E) 139,557.00

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 A.4.4.1.8 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 125,770.70
A Tenaga 33,850.00
L.01 0.300 OH Pekerja 75,000.00 22,500.00
L.02 0.100 OH Tukang Batu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 80,487.00
70.000 Buah Bata Merah 5 x 11 x 22 800.00 56,000.00
14.370 Kg Portland Semen 1,100.00 15,807.00
0.040 m3 Pasir Pasang 217,000.00 8,680.00
C PERALATAN
D Jumlah A + B + C 114,337.00
E Overhead & Profit 10% 11,433.70
F Harga Satuan Pekerjaan (D+E) 125,770.70

2 A.4.4.1.11 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 120,598.50
A Tenaga 33,850.00
L.01 0.300 OH Pekerja 75,000.00 22,500.00
L.02 0.100 OH Tukang Batu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 75,785.00
70.000 Buah Bata Merah 5 x 11 x 22 800.00 56,000.00
8.320 Kg Portland Semen 1,100.00 9,152.00
0.049 m3 Pasir Pasang 217,000.00 10,633.00
C PERALATAN
D Jumlah A + B + C 109,635.00
E Overhead & Profit 10% 10,963.50
F Harga Satuan Pekerjaan (D+E) 120,598.50

3 A.4.4.1.21 1.0000 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP 185,946.82
A TENAGA 33,850.00
L.01 0.3000 OH Pekerja 75,000.00 22,500.00
L.02 0.1000 OH Tukang Batu 90,000.00 9,000.00
L.03 0.0100 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.0150 OH Mandor 90,000.00 1,350.00
B BAHAN 135,192.56
12.5000 buah Batako 2,727.20 34,090.00
12.1300 kg PC 1,100.00 13,343.00
0.3880 m3 Pasir Pasang 217,000.00 84,196.00
0.2800 kg Besi Angkur Ø 8 mm 12,727.00 3,563.56
C PERALATAN
D Jumlah A + B + C 169,042.56
E Overhead & Profit 10% 16,904.26
F Harga Satuan Pekerjaan (D+E) 185,946.82

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.3 1.000 m2 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm 57,634.06
A Tenaga 38,850.00
L.01 0.300 OH Pekerja 75,000.00 22,500.00
L.02 0.150 OH Tukang batu 90,000.00 13,500.00
L.03 0.015 OH Kepala Tukang 100,000.00 1,500.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 13,544.60
7.776 Kg Portland Semen 1,100.00 8,553.60
0.023 m3 Pasir Pasang 217,000.00 4,991.00
C PERALATAN
D Jumlah A + B + C 52,394.60
E Overhead & Profit 10% 5,239.46
F Harga Satuan Pekerjaan (D+E) 57,634.06

2 A.4.4.2.6 1.000 m2 Pemasangan Plesteran 1 Pc : 6 Pp Tebal 15 mm 54,523.26


Tenaga 38,850.00
L.01 0.300 OH Pekerja 75,000.00 22,500.00
L.02 0.150 OH Tukang batu 90,000.00 13,500.00
L.03 0.015 OH Kepala Tukang 100,000.00 1,500.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
Bahan 10,716.60
4.416 Kg Portland Semen 1,100.00 4,857.60
0.027 m3 Pasir Pasang 217,000.00 5,859.00
C PERALATAN
D Jumlah A + B + C 49,566.60
E Overhead & Profit 10% 4,956.66
F Harga Satuan Pekerjaan (D+E) 54,523.26

3 A.4.4.2.20 1.000 m' Pemasangan Plesteran Skoning 1 Pc : 2Pp, lebar 10 mm 54,704.10


A Tenaga 46,360.00
L.01 0.080 OH Pekerja 75,000.00 6,000.00
L.02 0.400 OH Tukang batu 90,000.00 36,000.00
L.03 0.040 OH Kepala Tukang 100,000.00 4,000.00
L.04 0.004 OH Mandor 90,000.00 360.00
B Bahan 3,371.00
0.500 Kg Portland Semen 1,100.00 550.00
0.013 m3 Pasir Pasang 217,000.00 2,821.00
C PERALATAN
D Jumlah A + B + C 49,731.00
E Overhead & Profit 10% 4,973.10
F Harga Satuan Pekerjaan (D+E) 54,704.10
4 A.4.4.2.27 1.000 m2 Pemasangan Acian 32,422.50
A Tenaga 25,900.00
L.01 0.200 OH Pekerja 75,000.00 15,000.00
L.02 0.100 OH Tukang batu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.010 OH Mandor 90,000.00 900.00
B Bahan 3,575.00
3.250 Kg Portland Semen 1,100.00 3,575.00
C PERALATAN
D Jumlah A + B + C 29,475.00
E Overhead & Profit 10% 2,947.50
F Harga Satuan Pekerjaan (D+E) 32,422.50

VIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 A.4.4.3.a 1.0000 m2 Pasang Granite Tile 60 x 60 cm ( Polished ) 397,905.20
A TENAGA 84,200.00
L.01 0.6200 OH Pekerja 75,000.00 46,500.00
L.02 0.3500 OH Tukang Batu 90,000.00 31,500.00
L.03 0.0350 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.0300 OH Mandor 90,000.00 2,700.00
B BAHAN 277,532.00
1.0500 m2 Granite Tile 60 x 60 cm ( Polished ) 240,000.00 252,000.00
11.3800 Kg Portland Semen 1,100.00 12,518.00
0.0420 m3 Pasir Pasang 217,000.00 9,114.00
1.5000 Kg Semen Warna 2,600.00 3,900.00
C PERALATAN
D Jumlah A + B + C 361,732.00
E Overhead & Profit 10% 36,173.20
F Harga Satuan Pekerjaan (D+E) 397,905.20

2 A.4.4.3.b 1.0000 m2 Pasang Keramik 60 x 60 cm ( polished ) 322,830.20


A TENAGA 84,200.00
L.01 0.6200 OH Pekerja 75,000.00 46,500.00
L.02 0.3500 OH Tukang Batu 90,000.00 31,500.00
L.03 0.0350 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.0300 OH Mandor 90,000.00 2,700.00
B BAHAN 209,282.00
1.0500 m2 Keramik 60x60 polished 175,000.00 183,750.00
11.3800 Kg Portland Semen 1,100.00 12,518.00
0.0420 m3 Pasir Pasang 217,000.00 9,114.00
1.5000 Kg Semen Warna 2,600.00 3,900.00
C PERALATAN
D Jumlah A + B + C 293,482.00
E Overhead & Profit 10% 29,348.20
F Harga Satuan Pekerjaan (D+E) 322,830.20

3 A.4.4.3.35 1.0000 m2 Pemasangan Lantai Keramik 30 x 30 cm (Unpolished) 265,250.70


A TENAGA 90,650.00
L.01 0.7000 OH Pekerja 75,000.00 52,500.00
L.02 0.3500 OH Tukang Batu 90,000.00 31,500.00
L.03 0.0350 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.0350 OH Mandor 90,000.00 3,150.00
B BAHAN 150,487.00
11.8700 Buah Keramik 30 x 30 cm 10,600.00 125,822.00
10.0000 Kg Portland Semen 1,100.00 11,000.00
0.0450 m3 Pasir Pasang 217,000.00 9,765.00
1.5000 Kg Semen Warna 2,600.00 3,900.00
C PERALATAN
D Jumlah A + B + C 241,137.00
E Overhead & Profit 10% 24,113.70
F Harga Satuan Pekerjaan (D+E) 265,250.70

4 A.4.4.3.41.a 1.0000 m' Pemasangan Plin Lantai Granite Uk. 10 x 60 cm 66,786.50


A TENAGA 16,200.00
L.01 0.0900 OH Pekerja 75,000.00 6,750.00
L.02 0.0900 OH Tukang Batu 90,000.00 8,100.00
L.03 0.0090 OH Kepala Tukang 100,000.00 900.00
L.04 0.0050 OH Mandor 90,000.00 450.00
B BAHAN 44,515.00
1.0500 m' Plint Granite 10 x 60 40,333.33 42,350.00
1.1400 Kg Portland Semen 1,100.00 1,254.00
0.1000 Kg Semen Warna 2,600.00 260.00
0.0030 m3 Pasir Pasang 217,000.00 651.00
C PERALATAN
D Jumlah A + B + C 60,715.00
E Overhead & Profit 10% 6,071.50
F Harga Satuan Pekerjaan (D+E) 66,786.50

5 A.4.4.3.41.b 1.0000 m' Pemasangan Plin Keramik Uk. 10 x 60 cm 63,290.48


A TENAGA 16,200.00
L.01 0.0900 OH Pekerja 75,000.00 6,750.00
L.02 0.0900 OH Tukang Batu 90,000.00 8,100.00
L.03 0.0090 OH Kepala Tukang 100,000.00 900.00
L.04 0.0050 OH Mandor 90,000.00 450.00
B BAHAN 41,336.80
1.0500 m' Plint Keramik 10 x 60 17,500.00 18,375.00
1.1400 Kg Portland Semen 1,100.00 1,254.00
0.1000 Kg Semen Warna 217,000.00 21,700.00
0.0030 m3 Pasir Pasang 2,600.00 7.80
C PERALATAN
D Jumlah A + B + C 57,536.80
E Overhead & Profit 10% 5,753.68
F Harga Satuan Pekerjaan (D+E) 63,290.48

6 A.4.4.3.41.c 1.0000 m' Pemasangan Plint Alumunium 104,995.00


A TENAGA 16,200.00
L.01 0.0900 OH Pekerja 75,000.00 6,750.00
L.02 0.0900 OH Tukang Batu 90,000.00 8,100.00
L.03 0.0090 OH Kepala Tukang 100,000.00 900.00
L.04 0.0050 OH Mandor 90,000.00 450.00
B BAHAN 79,250.00
1.0500 m' Plint Alumunium 75,000.00 78,750.00
5.0000 buah skrup 100.00 500.00
C PERALATAN
D Jumlah A + B + C 95,450.00
E Overhead & Profit 10% 9,545.00
F Harga Satuan Pekerjaan (D+E) 104,995.00

7 A.4.4.3.41.d 1.0000 m' Pemasangan Step Nosing Tangga Uk. 10 x 60 cm 78,124.75


A TENAGA 16,200.00
L.01 0.0900 OH Pekerja 75,000.00 6,750.00
L.02 0.0900 OH Tukang Batu 90,000.00 8,100.00
L.03 0.0090 OH Kepala Tukang 100,000.00 900.00
L.04 0.0050 OH Mandor 90,000.00 450.00
B BAHAN 54,822.50
1.0500 m' Step Nosing Tangga 10 x 60 50,150.00 52,657.50
1.1400 Kg Portland Semen 1,100.00 1,254.00
0.1000 Kg Semen Warna 2,600.00 260.00
0.0030 m3 Pasir Pasang 217,000.00 651.00
C PERALATAN
D Jumlah A + B + C 71,022.50
E Overhead & Profit 10% 7,102.25
F Harga Satuan Pekerjaan (D+E) 78,124.75

8 A.4.4.3.41.e 1.0000 m' Pemasangan Border Keramik Dinding 10 x 30 77,951.50


A TENAGA 16,200.00
L.01 0.0900 OH Pekerja 75,000.00 6,750.00
L.02 0.0900 OH Tukang Batu 90,000.00 8,100.00
L.03 0.0090 OH Kepala Tukang 100,000.00 900.00
L.04 0.0050 OH Mandor 90,000.00 450.00
B BAHAN 54,665.00
1.0500 m' Border Keramik Dinding 10 x 30 50,000.00 52,500.00
1.1400 Kg Portland Semen 1,100.00 1,254.00
0.1000 Kg Semen Warna 2,600.00 260.00
0.0030 m3 Pasir Pasang 217,000.00 651.00
C PERALATAN
D Jumlah A + B + C 70,865.00
E Overhead & Profit 10% 7,086.50
F Harga Satuan Pekerjaan (D+E) 77,951.50

9 A.4.4.3.50.a 1.0000 m2 Pemasangan Dinding Keramik 30 x 60 cm, 333,525.50


A TENAGA 116,550.00
L.01 0.9000 OH Pekerja 75,000.00 67,500.00
L.02 0.4500 OH Tukang Batu 90,000.00 40,500.00
L.03 0.0450 OH Kepala Tukang 100,000.00 4,500.00
L.04 0.0450 OH Mandor 90,000.00 4,050.00
B BAHAN 186,655.00
1.0500 m2 Keramik 30 x 60 159,500.00 167,475.00
9.3000 Kg Portland Semen 1,100.00 10,230.00
0.0180 m3 Pasir Pasang 217,000.00 3,906.00
1.9400 Kg Semen Warna 2,600.00 5,044.00
C PERALATAN
D Jumlah A + B + C 303,205.00
E Overhead & Profit 10% 30,320.50
F Harga Satuan Pekerjaan (D+E) 333,525.50

10 A.4.4.3.41.f 1.0000 m' Pemasangan Hospital Plint 103,405.26


A TENAGA 16,200.00
L.01 0.0900 OH Pekerja 75,000.00 6,750.00
L.02 0.0900 OH Tukang Batu 90,000.00 8,100.00
L.03 0.0090 OH Kepala Tukang 100,000.00 900.00
L.04 0.0050 OH Mandor 90,000.00 450.00
B BAHAN 77,804.78
1.0500 m' Hospital Plint 72,037.89 75,639.78
1.1400 Kg Portland Semen 1,100.00 1,254.00
0.1000 Kg Semen Warna 2,600.00 260.00
0.0030 m3 Pasir Pasang 217,000.00 651.00
C PERALATAN
D Jumlah A + B + C 94,004.78
E Overhead & Profit 10% 9,400.48
F Harga Satuan Pekerjaan (D+E) 103,405.26

11 A.4.4.3.58 1.0000 m2 Pemasangan Dinding Granite Alam 1,199,279.52


A TENAGA 168,350.00
L.01 1.3000 OH Pekerja 75,000.00 97,500.00
L.02 0.6500 OH Tukang Batu 90,000.00 58,500.00
L.03 0.0650 OH Kepala Tukang 100,000.00 6,500.00
L.04 0.0650 OH Mandor 90,000.00 5,850.00
B BAHAN 921,904.11
1.0600 m2 Granite Alam 850,000.00 901,000.00
3.0030 bh Paku 12 cm 35.00 105.11
12.4400 kg Portland Sement 1,100.00 13,684.00
0.0250 m3 Pasir Pasang 217,000.00 5,425.00
0.6500 kg Semen Warna 2,600.00 1,690.00
C PERALATAN
D Jumlah A + B + C 1,090,254.11
E Overhead & Profit 10% 109,025.41
F Harga Satuan Pekerjaan (D+E) 1,199,279.52

12 A.4.4.3.58.b 1.0000 m2 Pemasangan Dinding Batu Paros / Batu Tempel Hitam 267,487.00
A TENAGA 90,650.00
L.01 0.7000 OH Pekerja 75,000.00 52,500.00
L.02 0.3500 OH Tukang Batu 90,000.00 31,500.00
L.03 0.0350 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.0350 OH Mandor 90,000.00 3,150.00
B BAHAN 152,520.00
1.1000 m2 Batu Paros 120,000.00 132,000.00
11.7500 Kg Portland Semen 1,100.00 12,925.00
0.0350 m3 Pasir Pasang 217,000.00 7,595.00
C PERALATAN
D Jumlah A + B + C 243,170.00
E Overhead & Profit 10% 24,317.00
F Harga Satuan Pekerjaan (D+E) 267,487.00

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


1 A.4.5.1.7 1.000 m2 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm 25,469.40
A Tenaga 12,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.050 OH Tukang Kayu 90,000.00 4,500.00
L.03 0.005 OH Kepala Tukang 100,000.00 500.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 10,204.00
0.364 Lbr Gypsum Board 23,500.00 8,554.00
0.110 Kg Paku Sekrup 15,000.00 1,650.00
C PERALATAN
D Jumlah A + B + C 23,154.00
E Overhead & Profit 10% 2,315.40
F Harga Satuan Pekerjaan (D+E) 25,469.40

2 A.4.5.1.8 1.000 m2 Memasang Langit-langit Kalsium Silikat Board, Ukuran (120x240) tebal 6 mm 24,868.80
A Tenaga 12,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.050 OH Tukang Kayu 90,000.00 4,500.00
L.03 0.005 OH Kepala Tukang 100,000.00 500.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 9,658.00
0.364 Lbr Kalsi Board 6 mm 22,000.00 8,008.00
0.110 Kg Paku Sekrup 15,000.00 1,650.00
C PERALATAN
D Jumlah A + B + C 22,608.00
E Overhead & Profit 10% 2,260.80
F Harga Satuan Pekerjaan (D+E) 24,868.80

3 A.4.5.1.9 1.000 m1 List Langit-Langit Gypsum 15,631.00


A Tenaga 9,020.00
L.01 0.050 OH Pekerja 75,000.00 3,750.00
L.02 0.050 OH Tukang Kayu 90,000.00 4,500.00
L.03 0.005 OH Kepala Tukang 100,000.00 500.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 5,190.00
1.050 m1 List Gypsum 4,800.00 5,040.00
0.010 Kg Paku 15,000.00 150.00
C PERALATAN
D Jumlah A + B + C 14,210.00
E Overhead & Profit 10% 1,421.00
F Harga Satuan Pekerjaan (D+E) 15,631.00

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.2 1.000 m2 Pemasangan Atap Genteng Kodok / Glasur 139,722.00
A Tenaga 19,520.00
L.01 0.150 OH Pekerja 75,000.00 11,250.00
L.02 0.075 OH Tukang Kayu 90,000.00 6,750.00
L.03 0.008 OH Kepala Tukang 100,000.00 800.00
L.04 0.008 OH Mandor 90,000.00 720.00
B Bahan 107,500.00
25.000 Buah Genteng Kodok / Glasur 4,300.00 107,500.00
C PERALATAN
D Jumlah A + B + C 127,020.00
E Overhead & Profit 10% 12,702.00
F Harga Satuan Pekerjaan (D+E) 139,722.00

2 A.4.5.2.5 1.000 m' Pemasangan Genteng Bubung Kodok / Glasur 122,016.40


A Tenaga 50,180.00
L.01 0.400 OH Pekerja 75,000.00 30,000.00
L.02 0.200 OH Tukang Kayu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.002 OH Mandor 90,000.00 180.00
B Bahan 60,744.00
5.000 Buah Genteng Bubung Kodok / Glasur 9,000.00 45,000.00
8.000 Kg Portland Semen 1,100.00 8,800.00
0.032 m3 Pasir Pasang 217,000.00 6,944.00
C PERALATAN
D Jumlah A + B + C 110,924.00
E Overhead & Profit 10% 11,092.40
F Harga Satuan Pekerjaan (D+E) 122,016.40

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.5 1.000 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II 858,137.50
A Tenaga 379,500.00
L.01 1.000 OH Pekerja 75,000.00 75,000.00
L.02 3.000 OH Tukang Kayu 90,000.00 270,000.00
L.03 0.300 OH Kepala Tukang 100,000.00 30,000.00
L.04 0.050 OH Mandor 90,000.00 4,500.00
B Bahan 400,625.00
0.040 m3 Kayu Klas II (Kamfer), papan 10,000,000.00 400,000.00
0.050 kg Lem Kayu 12,500.00 625.00
C PERALATAN
D Jumlah A + B + C 780,125.00
E Overhead & Profit 10% 78,012.50
F Harga Satuan Pekerjaan (D+E) 858,137.50

2 A.4.6.1.6 1.000 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II 602,085.00
A Tenaga 303,600.00
L.01 0.800 OH Pekerja 75,000.00 60,000.00
L.02 2.400 OH Tukang Kayu 90,000.00 216,000.00
L.03 0.240 OH Kepala Tukang 100,000.00 24,000.00
L.04 0.040 OH Mandor 90,000.00 3,600.00
B Bahan 243,750.00
0.024 m3 Kayu Klas II (Kamfer), papan 10,000,000.00 240,000.00
0.300 kg Lem Kayu 12,500.00 3,750.00
C PERALATAN
D Jumlah A + B + C 547,350.00
E Overhead & Profit 10% 54,735.00
F Harga Satuan Pekerjaan (D+E) 602,085.00

3 A.4.6.1.21 1.000 m' Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II 151,195.00
A Tenaga 27,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.200 OH Tukang Kayu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 109,500.00
0.011 m3 Kayu klas I (Jati), papan 10,000,000.00 108,000.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00
C PERALATAN
D Jumlah A + B + C 137,450.00
E Overhead & Profit 10% 13,745.00
F Harga Satuan Pekerjaan (D+E) 151,195.00

4 A.4.6.1.22 1.000 m' Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 152,570.00
A Tenaga 27,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.200 OH Tukang Kayu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 110,750.00
0.011 m3 Kayu klas II (Kamfer), papan 10,000,000.00 110,000.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00
C PERALATAN
D Jumlah A + B + C 138,700.00
E Overhead & Profit 10% 13,870.00
F Harga Satuan Pekerjaan (D+E) 152,570.00

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1.000 Buah Pemasangan Kunci Tanam Biasa 222,420.00
A Tenaga 47,200.00
L.01 0.010 OH Pekerja 75,000.00 750.00
L.02 0.500 OH Tukang Kayu 90,000.00 45,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 155,000.00
1.000 Buah Kunci Tanam Biasa 155,000.00 155,000.00
C PERALATAN
D Jumlah A + B + C 202,200.00
E Overhead & Profit 10% 20,220.00
F Harga Satuan Pekerjaan (D+E) 222,420.00
Overhead & Profit

2 A.4.6.2.3 1.000 Buah Pemasangan Kunci Kamar Mandi 160,710.00


A Tenaga 46,100.00
L.01 0.005 OH Pekerja 75,000.00 375.00
L.02 0.500 OH Tukang Kayu 90,000.00 45,000.00
L.03 0.005 OH Kepala Tukang 100,000.00 500.00
L.04 0.003 OH Mandor 90,000.00 225.00
B Bahan 100,000.00
1.000 Buah Kunci Tanam Kamar Mandi 100,000.00 100,000.00
C PERALATAN
D Jumlah A + B + C 146,100.00
E Overhead & Profit 10% 14,610.00
F Harga Satuan Pekerjaan (D+E) 160,710.00

3 A.4.6.2.4 1.000 Buah Pemasangan Kunci Selinder 221,210.00


A Tenaga 46,100.00
L.01 0.005 OH Pekerja 75,000.00 375.00
L.02 0.500 OH Tukang Kayu 90,000.00 45,000.00
L.03 0.005 OH Kepala Tukang 100,000.00 500.00
L.04 0.003 OH Mandor 90,000.00 225.00
B Bahan 155,000.00
1.000 Buah Kunci Selinder 155,000.00 155,000.00
C PERALATAN
D Jumlah A + B + C 201,100.00
E Overhead & Profit 10% 20,110.00
F Harga Satuan Pekerjaan (D+E) 221,210.00

4 A.4.6.2.5 1.000 Buah Pemasangan Engsel Pintu 36,630.00


A Tenaga 16,800.00
L.01 0.015 OH Pekerja 75,000.00 1,125.00
L.02 0.150 OH Tukang Kayu 90,000.00 13,500.00
L.03 0.015 OH Kepala Tukang 100,000.00 1,500.00
L.04 0.008 OH Mandor 90,000.00 675.00
B Bahan 16,500.00
1.000 Buah Engsel pintu 16,500.00 16,500.00
C PERALATAN
D Jumlah A + B + C 33,300.00
E Overhead & Profit 10% 3,330.00
F Harga Satuan Pekerjaan (D+E) 36,630.00

5 A.4.6.2.6 1.000 Buah Pemasangan Engsel Jendela Kupu-kupu 30,470.00


A Tenaga 11,200.00
L.01 0.010 OH Pekerja 75,000.00 750.00
L.02 0.100 OH Tukang Kayu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 16,500.00
1.000 Buah Engsel Jendela 16,500.00 16,500.00
C PERALATAN
D Jumlah A + B + C 27,700.00
E Overhead & Profit 10% 2,770.00
F Harga Satuan Pekerjaan (D+E) 30,470.00

6 A.4.6.2.7 1.000 Buah Pemasangan Engsel Angin 48,449.50


A Tenaga 27,545.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.200 OH Tukang Kayu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.001 OH Mandor 90,000.00 45.00
B Bahan 16,500.00
1.000 Buah Engsel Angin 16,500.00 16,500.00
C PERALATAN
D Jumlah A + B + C 44,045.00
E Overhead & Profit 10% 4,404.50
F Harga Satuan Pekerjaan (D+E) 48,449.50

7 A.4.6.2.9 1.000 Buah Pemasangan Kait Angin 30,629.50


A Tenaga 16,845.00
L.01 0.015 OH Pekerja 75,000.00 1,125.00
L.02 0.150 OH Tukang Kayu 90,000.00 13,500.00
L.03 0.015 OH Kepala Tukang 100,000.00 1,500.00
L.04 0.008 OH Mandor 90,000.00 720.00
B Bahan 11,000.00
1.000 Buah Kait Angin 11,000.00 11,000.00
C PERALATAN
D Jumlah A + B + C 27,845.00
E Overhead & Profit 10% 2,784.50
F Harga Satuan Pekerjaan (D+E) 30,629.50

8 A.4.6.2.10 1.000 Buah Pasang Door Closer 334,372.50


A Tenaga 53,975.00
L.01 0.050 OH Pekerja 75,000.00 3,750.00
L.02 0.500 OH Tukang Kayu 90,000.00 45,000.00
L.03 0.050 OH Kepala Tukang 100,000.00 5,000.00
L.04 0.003 OH Mandor 90,000.00 225.00
B Bahan 250,000.00
1.000 Buah Door Closer 250,000.00 250,000.00
C PERALATAN
D Jumlah A + B + C 303,975.00
E Overhead & Profit 10% 30,397.50
F Harga Satuan Pekerjaan (D+E) 334,372.50

9 A.4.6.2.11 1.000 Buah Pemasangan Kunci Selot 31,999.00


A Tenaga 21,590.00
L.01 0.020 OH Pekerja 75,000.00 1,500.00
L.02 0.200 OH Tukang Kayu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.001 OH Mandor 90,000.00 90.00
B Bahan 7,500.00
1.000 Buah Kunci Selot 7,500.00 7,500.00
C PERALATAN
D Jumlah A + B + C 29,090.00
E Overhead & Profit 10% 2,909.00
F Harga Satuan Pekerjaan (D+E) 31,999.00

10 A.4.6.2.13 1.000 Buah Pemasangan Door Stop 286,874.50


A Tenaga 10,795.00
L.01 0.010 OH Pekerja 75,000.00 750.00
L.02 0.100 OH Tukang Kayu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.001 OH Mandor 90,000.00 45.00
B Bahan 250,000.00
1.000 Buah Door Stop 250,000.00 250,000.00
C PERALATAN
D Jumlah A + B + C 260,795.00
E Overhead & Profit 10% 26,079.50
F Harga Satuan Pekerjaan (D+E) 286,874.50

11 A.4.6.2.16 1.000 m2 Pemasangan Kaca Bening tebal 3 mm 117,031.75


A Tenaga 16,192.50
L.01 0.015 OH Pekerja 75,000.00 1,125.00
L.02 0.150 OH Tukang Kayu 90,000.00 13,500.00
L.03 0.015 OH Kepala Tukang 100,000.00 1,500.00
L.04 0.001 OH Mandor 90,000.00 67.50
B Bahan 90,200.00
1.100 m2 Kaca Bening tebal 3mm 82,000.00 90,200.00
C PERALATAN
D Jumlah A + B + C 106,392.50
E Overhead & Profit 10% 10,639.25
F Harga Satuan Pekerjaan (D+E) 117,031.75

12 A.4.6.2.17 1.000 m2 Pemasangan Kaca Bening tebal 5 mm 172,691.75


A Tenaga 16,192.50
L.01 0.015 OH Pekerja 75,000.00 1,125.00
L.02 0.150 OH Tukang Kayu 90,000.00 13,500.00
L.03 0.015 OH Kepala Tukang 100,000.00 1,500.00
L.04 0.001 OH Mandor 90,000.00 67.50
B Bahan 140,800.00
1.100 m2 Kaca Bening tebal 5mm 128,000.00 140,800.00
C PERALATAN
D Jumlah A + B + C 156,992.50
E Overhead & Profit 10% 15,699.25
F Harga Satuan Pekerjaan (D+E) 172,691.75

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


1 A.4.7.1.10 1.000 m2 Pengecat Tembok Baru (Interior) 22,011.00
A Tenaga 8,070.00
L.01 0.020 OH Pekerja 75,000.00 1,500.00
L.02 0.063 OH Tukang Cat 90,000.00 5,670.00
L.03 0.006 OH Kepala Tukang 100,000.00 630.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 11,940.00
0.100 Kg Plamir 32,000.00 3,200.00
0.100 Kg Cat Dasar 12,000.00 1,200.00
0.260 Kg Cat Penutup 2 kali 29,000.00 7,540.00
C PERALATAN
D Jumlah A + B + C 20,010.00
E Overhead & Profit 10% 2,001.00
F Harga Satuan Pekerjaan (D+E) 22,011.00

2 A.4.7.1.10b 1.000 m2 Pengecat Tembok Baru (Eksterior) 40,029.00


A Tenaga 8,070.00
L.01 0.020 OH Pekerja 75,000.00 1,500.00
L.02 0.063 OH Tukang Cat 90,000.00 5,670.00
L.03 0.006 OH Kepala Tukang 100,000.00 630.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 28,320.00
0.100 Kg Plamir 32,000.00 3,200.00
0.100 Kg Cat Dasar 12,000.00 1,200.00
0.260 Kg Cat Penutup 2 kali 92,000.00 23,920.00
C PERALATAN
D Jumlah A + B + C 36,390.00
E Overhead & Profit 10% 3,639.00
F Harga Satuan Pekerjaan (D+E) 40,029.00

3 A.4.7.1.4 1.000 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutu 40,656.00
A Tenaga 8,070.00
L.01 0.020 OH Pekerja 75,000.00 1,500.00
L.02 0.063 OH Tukang Cat 90,000.00 5,670.00
L.03 0.006 OH Kepala Tukang 100,000.00 630.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 28,890.00
0.2000 Kg Cat Menie 25,000.00 5,000.00
0.1500 Kg Plamur 22,500.00 3,375.00
0.1700 Kg Cat Dasar 34,000.00 5,780.00
0.2600 Kg Cat Penutup 52,500.00 13,650.00
0.0100 bh Kuas 7,500.00 75.00
0.0300 Kg Pengencer 17,000.00 510.00
0.2000 lbr Amplas 2,500.00 500.00
C PERALATAN
D Jumlah A + B + C 36,960.00
E Overhead & Profit 10% 3,696.00
F Harga Satuan Pekerjaan (D+E) 40,656.00

XIV A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 1.000 Unit Pemasangan Closet Duduk / Mono Blok 2,554,200.00
A Tenaga 361,000.00
L.01 3.300 OH Pekerja 75,000.00 247,500.00
L.02 1.100 OH Tukang Batu 90,000.00 99,000.00
L.03 0.001 OH Kepala Tukang 100,000.00 100.00
L.04 0.160 OH Mandor 90,000.00 14,400.00
Buah Bahan 1,961,000.00
1.000 Buah Kloset Duduk / Monoblok 1,850,000.00 1,850,000.00
0.060 Kelengkapan 6% dari harga Kloset 1,850,000.00 111,000.00
C PERALATAN
D Jumlah A + B + C 2,322,000.00
E Overhead & Profit 10% 232,200.00
F Harga Satuan Pekerjaan (D+E) 2,554,200.00
Overhead & Profit

2 A.5.1.1.2 1.000 Unit Pemasangan Closet Jongkok Porselen 575,487.00


A Tenaga 374,400.00
L.01 1.000 OH Pekerja 75,000.00 75,000.00
L.02 1.500 OH Tukang Batu 90,000.00 135,000.00
L.03 1.500 OH Kepala Tukang 100,000.00 150,000.00
L.04 0.160 OH Mandor 90,000.00 14,400.00
B Bahan 148,770.00
1.000 Buah Kloset Jongkok 140,000.00 140,000.00
6.000 Kg Portland Semen 1,100.00 6,600.00
0.010 m3 Pasir Pasang 217,000.00 2,170.00
C PERALATAN
D Jumlah A + B + C 523,170.00
E Overhead & Profit 10% 52,317.00
F Harga Satuan Pekerjaan (D+E) 575,487.00

3 A.5.1.1.5 1.000 Unit Pemasangan Wastafel 549,802.00


A Tenaga 127,050.00
L.01 1.200 OH Pekerja 75,000.00 90,000.00
L.02 0.145 OH Tukang Batu 90,000.00 13,050.00
L.03 0.150 OH Kepala Tukang 100,000.00 15,000.00
L.04 0.100 OH Mandor 90,000.00 9,000.00
B Bahan 372,770.00
1.000 Buah Wastafel 280,000.00 280,000.00
0.300 - Perlengkapan 30% Harga Wastafel 280,000.00 84,000.00
6.000 Kg Portland Semen 1,100.00 6,600.00
0.010 m3 Pasir Pasang 217,000.00 2,170.00
C PERALATAN
D Jumlah A + B + C 499,820.00
E Overhead & Profit 10% 49,982.00
F Harga Satuan Pekerjaan (D+E) 549,802.00

4 A.5.1.1.12 1.000 buah Pemasangan Bak Cuci Piring Stainless Stell 339,460.00
A Tenaga 33,600.00
L.01 0.030 OH Pekerja 75,000.00 2,250.00
L.02 0.300 OH Tukang Batu 90,000.00 27,000.00
L.03 0.030 OH Kepala Tukang 100,000.00 3,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 275,000.00
1.000 unit Bak Cuci Piring 225,000.00 225,000.00
1.000 bh Water drain 50,000.00 50,000.00
C PERALATAN
D Jumlah A + B + C 308,600.00
E Overhead & Profit 10% 30,860.00
F Harga Satuan Pekerjaan (D+E) 339,460.00

5 A.5.1.1.12.a 1.000 buah PemasanganSink Stainless Stell Standar 322,960.00


A Tenaga 33,600.00
L.01 0.030 OH Pekerja 75,000.00 2,250.00
L.02 0.300 OH Tukang Batu 90,000.00 27,000.00
L.03 0.030 OH Kepala Tukang 100,000.00 3,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 260,000.00
1.000 unit Bak Cuci Piring 210,000.00 210,000.00
1.000 bh Water drain 50,000.00 50,000.00
C PERALATAN
D Jumlah A + B + C 293,600.00
E Overhead & Profit 10% 29,360.00
F Harga Satuan Pekerjaan (D+E) 322,960.00
6 A.5.1.1.14 1.000 buah Pemasangan Floor Drain 45,320.00
A Tenaga 11,200.00
L.01 0.010 OH Pekerja 75,000.00 750.00
L.02 0.100 OH Tukang Batu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 30,000.00
1.000 bh Floor Drain 30,000.00 30,000.00
C PERALATAN
D Jumlah A + B + C 41,200.00
E Overhead & Profit 10% 4,120.00
F Harga Satuan Pekerjaan (D+E) 45,320.00

7 A.5.1.1.19 1.000 bh Pemasangan Kran Ø ½" atau Ø ¾" 67,325.50


A Tenaga 41,200.00
L.01 0.010 OH Pekerja 75,000.00 750.00
L.02 0.400 OH Tukang Batu 90,000.00 36,000.00
L.03 0.040 OH Kepala Tukang 100,000.00 4,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 20,005.00
1.000 bh Kran Air 20,000.00 20,000.00
0.003 bh Sealtape 2,000.00 5.00
C PERALATAN
D Jumlah A + B + C 61,205.00
E Overhead & Profit 10% 6,120.50
F Harga Satuan Pekerjaan (D+E) 67,325.50

8 A.5.1.1.19.a 1.000 bh Pemasangan Kran Tangkai Panjang 152,960.50


A Tenaga 41,200.00
L.01 0.010 OH Pekerja 75,000.00 750.00
L.02 0.400 OH Tukang Batu 90,000.00 36,000.00
L.03 0.040 OH Kepala Tukang 100,000.00 4,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 97,855.00
1.000 bh Kran Air 97,850.00 97,850.00
0.003 bh Sealtape 2,000.00 5.00
C PERALATAN
D Jumlah A + B + C 139,055.00
E Overhead & Profit 10% 13,905.50
F Harga Satuan Pekerjaan (D+E) 152,960.50

9 A.5.1.1.19.b 1.000 bh Pemasangan Kran Tangkai Putar 152,960.50


A Tenaga 41,200.00
L.01 0.010 OH Pekerja 75,000.00 750.00
L.02 0.400 OH Tukang Batu 90,000.00 36,000.00
L.03 0.040 OH Kepala Tukang 100,000.00 4,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 97,855.00
1.000 bh Kran Air 97,850.00 97,850.00
0.003 bh Sealtape 2,000.00 5.00
C PERALATAN
D Jumlah A + B + C 139,055.00
E Overhead & Profit 10% 13,905.50
F Harga Satuan Pekerjaan (D+E) 152,960.50

10 A.5.1.1.25 1.000 m' Pemasangan Pipa PVC tipe AW Ø ½" 18,719.25


A Tenaga 8,880.00
L.01 0.036 OH Pekerja 75,000.00 2,700.00
L.02 0.060 OH Tukang Batu 90,000.00 5,400.00
L.03 0.006 OH Kepala Tukang 100,000.00 600.00
L.04 0.002 OH Mandor 90,000.00 180.00
B Bahan 8,137.50
1.200 m' Pipa PVC Ø ½" 5,250.00 6,300.00
0.350 Ls Perlengkapan 35% x pipa 5,250.00 1,837.50
C PERALATAN
D Jumlah A + B + C 17,017.50
E Overhead & Profit 10% 1,701.75
F Harga Satuan Pekerjaan (D+E) 18,719.25

11 A.5.1.1.26 1.000 m' Pemasangan Pipa PVC tipe AW Ø ¾" 21,276.75


A Tenaga 8,880.00
L.01 0.036 OH Pekerja 75,000.00 2,700.00
L.02 0.060 OH Tukang Batu 90,000.00 5,400.00
L.03 0.006 OH Kepala Tukang 100,000.00 600.00
L.04 0.002 OH Mandor 90,000.00 180.00
B Bahan 10,462.50
1.200 m' Pipa PVC Ø ¾" 6,750.00 8,100.00
0.350 Ls Perlengkapan 35% x pipa 6,750.00 2,362.50
C PERALATAN
D Jumlah A + B + C 19,342.50
E Overhead & Profit 10% 1,934.25
F Harga Satuan Pekerjaan (D+E) 21,276.75

12 A.5.1.1.27 1.000 m' Pemasangan Pipa PVC tipe AW Ø 1" 28,523.00


A Tenaga 8,880.00
L.01 0.036 OH Pekerja 75,000.00 2,700.00
L.02 0.060 OH Tukang Batu 90,000.00 5,400.00
L.03 0.006 OH Kepala Tukang 100,000.00 600.00
L.04 0.002 OH Mandor 90,000.00 180.00
B Bahan 17,050.00
1.200 m' Pipa PVC Ø 1" 11,000.00 13,200.00
0.350 Ls Perlengkapan 35% x pipa 11,000.00 3,850.00
C PERALATAN
D Jumlah A + B + C 25,930.00
E Overhead & Profit 10% 2,593.00
F Harga Satuan Pekerjaan (D+E) 28,523.00

13 A.5.1.1.28 1.000 m' Pemasangan Pipa PVC tipe AW Ø 1½" 26,871.17


A Tenaga 13,320.00
L.01 0.054 OH Pekerja 75,000.00 4,050.00
L.02 0.090 OH Tukang Batu 90,000.00 8,100.00
L.03 0.009 OH Kepala Tukang 100,000.00 900.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 11,108.33
1.200 m' Pipa PVC Ø 1½" 7,166.67 8,600.00
0.350 Ls Perlengkapan 35% x pipa 7,166.67 2,508.33
C PERALATAN
D Jumlah A + B + C 24,428.33
E Overhead & Profit 10% 2,442.83
F Harga Satuan Pekerjaan (D+E) 26,871.17

14 A.5.1.1.29 1.000 m' Pemasangan Pipa PVC tipe AW Ø 2" 30,281.17


A Tenaga 13,320.00
L.01 0.054 OH Pekerja 75,000.00 4,050.00
L.02 0.090 OH Tukang Batu 90,000.00 8,100.00
L.03 0.009 OH Kepala Tukang 100,000.00 900.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 14,208.33
1.200 m' Pipa PVC Ø 2" 9,166.67 11,000.00
0.350 Ls Perlengkapan 35% x pipa 9,166.67 3,208.33
C PERALATAN
D Jumlah A + B + C 27,528.33
E Overhead & Profit 10% 2,752.83
F Harga Satuan Pekerjaan (D+E) 30,281.17

15 A.5.1.1.31 1.000 m' Pemasangan Pipa PVC tipe AW Ø 3" 47,219.33


A Tenaga 19,935.00
L.01 0.081 OH Pekerja 75,000.00 6,075.00
L.02 0.135 OH Tukang Batu 90,000.00 12,150.00
L.03 0.014 OH Kepala Tukang 100,000.00 1,350.00
L.04 0.004 OH Mandor 90,000.00 360.00
B Bahan 22,991.67
1.200 m' Pipa PVC Ø 3" 14,833.33 17,800.00
0.350 Ls Perlengkapan 35% x pipa 14,833.33 5,191.67
C PERALATAN
D Jumlah A + B + C 42,926.67
E Overhead & Profit 10% 4,292.67
F Harga Satuan Pekerjaan (D+E) 47,219.33
DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO. J E N I S B A H A N SAT HARGA SATUAN (Rp) KET

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 170,000
Bulat Belah m3 180,000
Pecah 10/15 m3 238,000
Pecah 5/7 m3 238,000
Pecah 3/5 m3 238,000
2 KERIKIL Timbun m3 185,000
Sawur / Koral m3 185,000
Beton 0,5/1 m3 244,000
Beton 1/2 m3 240,000
Beton 2/3 m3 250,000
Biasa m3 240,000
Tras Giling m3 290,000
3 BATU BATA ex lokal bh 800

4 PASIR Urug m3 195,000


Pasang m3 217,000
Beton m3 392,000
5 TANAH Padas m3 60,000
Liat m3 65,000
7 PORTLAND CEMENT
Merk I 50 kg zak 55,000
Semen warna kg 2,600

II BAHAN PENUTUP ATAP

3 GENTENG TANAH LIAT


Kodok Glasur bh 4,300
Nok kerpus Kodok Glasur bh 9,000

5 ASBES GELOMBANG BESAR


. 180 cm X 105 cm X 4 mm bh 30,000
8 SENG PLAT
BJLS 0,28 lebar 55 cm m' 36,000
BJLS 0,30 lebar 55 cm m' 37,500
9 SENG GELOMBANG
BJLS 0,30 panjang 180 cm lbr 50,000

III . B A H A N K A Y U
1 JATI Papan m3 19,000,000
Balok/pesagen m3 19,000,000
2 KAMPER Papan m3 10,000,000
Balok/pesagen m3 8,500,000
3 KRUING Papan m3 6,500,000
Balok/pesagen m3 5,650,000
6 BENGKIRAI Papan m3 11,500,000
Balok/pesagen m3 10,000,000
7 DOLKEN Sedang 8 x 10 x 400 cm bt 22,000
Kecil 6 x 7 x 400 cm bt 22,000
Besar 10 x 12 x 400 cm bt 22,000
Kayu cetakan m3 2,500,000
Kayu bakar m3 110,000
Bambu bt 22,000
IV . BAHAN PENUTUP DINDING / LANTAI
1 POLIS UBIN
Plint Granite 10 x 60 m' 40,333.33
Plint Keramik 10 x 60 m' 17,500.00
Plint Alumunium m' 75,000.00
Step Nosing 10 x 60 m' 50,150.00
Border Keramik 10 x 30 m' 50,000.00
Hospital Plint m' 72,037.89
2 GRANITE TILE
60 x 60 cm m2 240,000.00
3 KERAMIK
30 X 30 cm m2 116,600.00
30 X 60 cm m2 159,500.00
60 x 60 cm Polished m2 175,000.00
60 x 60 cm Unolished m2 175,000.00
5 BATU ALAM
Batu Paros m2 120,000.00
Batu Tempel Hitam m2 115,000.00
Granite Alam m2 850,000.00

V.BAHAN CETAK
BUIS BETON Ø 20 cm - 100 cm bh 51,000
Ø 30 cm - 100 cm bh 71,000
U 20 cm - 100 cm bh 39,000
U 30 cm - 100 cm bh 48,000
2 LUBANG ANGIN (ROSTER) PC + PASIR
20 X 20 cm bh 15,000

VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000
besi beton prestress kg 10,000
besi beton ulir kg 10,000

2 BESI PLAT Besi Strip kg 13,000

3 BESI PROFIL Besi Profil kg 11,500


6 KAWAT - Ikat beton/bendrat kg 22,000

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 21,000 panjang 4 m
Pipa PVC DN 25 ( ¾" ) AW JIS btg 27,000 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 44,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 43,000 panjang 4 m
Pipa PVC DN 63 ( 2" ) btg 55,000 panjang 4 m
Pipa PVC DN 90 ( 3" ) btg 89,000 panjang 4 m

VIII . B A H A N L A N G I T - L A N G I T
1 List Gypsum m' 4,800
2 Gypsum tebal 9 mm lbr 23,500
3 Kalsi Board 6 mm lbr 22,000
4 Formika ukuran pintu lbr 68,000

IX . B A H A N F I N I S H I N G
1 TEMBOK
Cat Tembok Eksterior (setara Mowilex) kg 92,000
Cat Tembok Interior (setara Catylac) kg 29,000
2 BESI
Men Besi kg 32,000

X.BAHAN KACA
1 POLOS 3 mm m2 82,000
5 mm m2 128,000
2 ES KABUR 3 mm m2 100,000
5 mm m2 134,000
3 RAY BAND 3 mm m2 85,000
5 mm m2 130,000

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh 105,000
2 X slag bh 155,000

2 ENGSEL DAN GERENDEL


Engsel Angin bh 16,500
Grendel Tanam bh 70,000
Grendel biasa bh 7,500
Kait Angin bh 11,000
Door Stop bh 250,000

XIII . BAHAN SANITAIR


1 KLOSET DUDUK bh 1,850,000
2 KLOSET JONGKOK bh 140,000
5 WASTAFEL GANTUNG bh 280,000
8 WASTAFEL BAK CUCI bh 170,000
10 TEMPAT SABUN TANAM bh 20,000

11 LAIN - LAIN
Kran Air bh 20,000
Seal tape bh 2,000
Floor drain bh 30,000

XIV . ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 15,000
2 PAKU - payung kg 20,000
3 PAKU - sekrup kg 6,000
4 PAKU - beton kg 25,000
5 MUR BAUT (kuda-kuda) kg 13,000
6 ANGKUR BAUT bh 13,000
7 LEM KAYU bh 12,500
8 Tali Ijuk kg 7,000

XVII. L A I N - L A I N
Minyak Beton & bekisting ltr 9,000
Profil Aluminium m' 125,000
Pintu Lipat Besi m2 380,000
Sunscreen Allumunim m2 310,000
Allumunium Foil m2 7,500
Soda api kg 12,000
Sabun kg 11,000
Air m3 15,000
Koas Alang-alang ikat 1,250
Solar (Industri) ltr 7,000
Premium (Industri) ltr 6,200
Pelumas ltr 37,500
Vynil 30x30 cm bh 6,200
DAFTAR UPAH PEKERJA

NO. URAIAN PEKERJA

1 Pekerja
2 Mandor
3 Tukang listrik
4 Tukang kayu
5 Kep . tk . kayu
6 Tukang batu
7 Kep . tk . Batu
8 Tukang besi
PEKERJAAN KOLOM pondasi

A PEKERJAAN PONDASI :
*) PEKERJAAN STRAUS PILE
TYPE JUMLAH TITIK Σ TITIK L ΣL
PILE CAP BORED BORED BORED
PC1 1.00 1.00 1.00 12.00 12.00
PC2 3.00 2.00 6.00 12.00 72.00
PC3 12.00 3.00 36.00 12.00 432.00
PC4 7.00 4.00 28.00 12.00 336.00
PC5L 1.00 5.00 5.00 12.00 60.00

76.00 Titik 912.00 m'

*) PEKERJAAN BETON BERTULANG STRAUS PILE


TYPE JUMLAH TITIK L A V
PILE CAP BORED Ø 40 cm
PC1 1.00 1.00 12.00 0.13 1.51
PC2 3.00 2.00 12.00 0.13 9.04
PC3 12.00 3.00 12.00 0.13 54.26
PC4 7.00 4.00 12.00 0.13 42.20
PC5L 1.00 5.00 12.00 0.13 7.54

114.55 m3

Beton Bertulang Bored Pil Jumlah H A V


BETON 76.00 12.00 0.13 114.55 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 13 76.00 12.00 12.00 1.04 11,402.39 kg
Sengkang 8 0.10 76.00 16.00 1.38 0.39 662.87 kg
Sengkang 8 0.20 76.00 51.00 1.38 0.39 2,112.90 kg
14,178.16 kg
Per m3 123.78 kg

*) PEKERJAAN GALIAN PILE CAP


TYPE JUMLAH B B H V
PILE CAP
PC1 1.00 0.80 0.80 0.60 0.38
PC2 3.00 2.00 0.80 0.60 2.88
PC3 12.00 2.00 1.84 0.80 35.33
PC4 7.00 2.00 2.00 0.80 22.40
PC5L 1.00 3.50 4.20 1.90 27.93

88.92 m3

*) PEKERJAAN URUGAN PASIR


TYPE JUMLAH B B H V
PILE CAP
PC1 1.00 0.80 0.80 0.05 0.03
PC2 3.00 2.00 0.80 0.05 0.24
PC3 12.00 2.00 1.84 0.05 2.21
PC4 7.00 2.00 2.00 0.05 1.40
PC5L 1.00 3.50 4.20 0.05 0.74

4.62 m3

*) PEKERJAAN LANTAI KERJA


TYPE JUMLAH B B H V
PILE CAP
PC1 1.00 0.80 0.80 0.05 0.03
PC2 3.00 2.00 0.80 0.05 0.24
PC3 12.00 2.00 1.84 0.05 2.21
PC4 7.00 2.00 2.00 0.05 1.40
PC5L 1.00 3.50 4.20 0.05 0.74
ct scan 1.00 3.00 2.00 0.05 0.30

4.92 m3

*) PEKERJAAN BETON BERTULANG PILE CAP


PC1
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC1 1.00 0.80 0.80 0.50 0.32 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 1.00 6.33 1.45 1.04 9.57 kg
13 0.15 1.00 6.33 1.45 1.04 9.57 kg
BAWAH 13 0.15 1.00 6.33 0.95 1.04 6.27 kg
13 0.15 1.00 6.33 0.95 1.04 6.27 kg
31.67 kg
Per m3 98.98 kg
BEKISTING Jumlah X Y H VOL
1.00 0.80 0.80 0.50 1.60 m2
Per m3 5.00 m2

BETON 0.32 m3
BESI 31.67 kg
BEKISTING 1.60 m2

PC2
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC2 3.00 2.00 0.80 0.50 2.40 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 3.00 14.33 1.45 1.04 64.96 kg
13 0.15 3.00 6.33 2.14 1.04 42.36 kg
BAWAH 19 0.15 3.00 14.33 0.95 2.23 90.91 kg
19 0.15 3.00 6.33 2.60 2.23 109.94 kg
308.18 kg
Per m3 128.41 kg
BEKISTING Jumlah X Y H VOL
3.00 2.00 0.80 0.50 8.40 m2
Per m3 3.50 m2

BETON 2.40 m3
BESI 308.18 kg
BEKISTING 8.40 m2

PC3
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC3 12.00 2.00 1.84 0.70 30.91 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 12.00 14.33 2.89 1.04 517.36 kg
13 0.15 12.00 13.27 3.03 1.04 502.58 kg
BAWAH 19 0.10 12.00 21.00 2.02 2.23 1,132.90 kg
19 0.10 12.00 19.40 2.17 2.23 1,124.30 kg
SENGKANG 13 0.15 12.00 2.67 7.52 1.04 250.65 kg
3,527.80 kg
Per m3 114.12 kg
BEKISTING Jumlah X Y H VOL
12.00 2.00 1.84 0.70 64.51 m2
Per m3 2.09 m2

BETON 30.91 m3
BESI 3,527.80 kg
BEKISTING 64.51 m2

PC4
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC4 7.00 2.00 2.00 0.80 22.40 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 7.00 14.33 3.03 1.04 316.74 kg
13 0.15 7.00 14.33 3.03 1.04 316.74 kg
BAWAH 19 0.10 7.00 21.00 2.17 2.23 709.93 kg
19 0.10 7.00 21.00 2.17 2.23 709.93 kg
SENGKANG 13 0.15 7.00 3.33 7.84 1.04 190.55 kg
2,243.90 kg
Per m3 100.17 kg
BEKISTING Jumlah X Y H VOL
7.00 2.00 2.00 0.80 44.80 m2
Per m3 2.00 m2

BETON 22.40 m3
BESI 2,243.90 kg
BEKISTING 44.80 m2

PC5L
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC5L 1.00 3.50 4.20 0.50 7.35 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 1.00 24.33 4.51 1.04 114.34 kg
13 0.15 1.00 29.00 3.81 1.04 115.12 kg
BAWAH 16 0.10 1.00 36.00 4.47 1.58 253.97 kg
16 0.10 1.00 43.00 3.77 1.58 255.85 kg
SENGKANG 13 0.15 1.00 1.33 15.24 1.04 21.17 kg
760.44 kg
Per m3 103.46 kg
BEKISTING Jumlah X Y H VOL
1.00 3.50 4.20 0.50 7.70 m2
Per m3 1.05 m2

BETON 7.35 m3
BESI 760.44 kg
BEKISTING 7.70 m2

*) BETON BERTULANG PLAT DINDING PIT LIFT


Beton Bertulang Dinding Jumlah X Y H VOL
BETON 1.00 13.00 0.20 1.60 4.16
4.16 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
13.00 13 0.20 1.00 9.00 13.12 1.04 123.03 kg
13.00 13 0.20 1.00 66.00 2.22 1.04 152.66 kg
DINDING
13.00 13 0.20 1.00 9.00 13.12 1.04 123.03 kg
13.00 13 0.20 1.00 66.00 2.22 1.04 152.66 kg
551.37 kg
Per m3 132.54 kg
BEKISTING Jumlah Keliling Tinggi Sisi V
1.00 13.00 1.60 2.00 41.60
41.60 m2
Per m3 10.00 m2

BETON 4.16 m3
BESI 551.37 kg
BEKISTING 41.60 m2

CT SCAN
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON CT SCAN 1.00 2.00 3.00 0.25 1.50 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 10 0.15 1.00 14.33 3.15 0.62 27.83 kg
10 0.15 1.00 21.00 2.10 0.62 27.19 kg
BAWAH 10 0.10 1.00 21.00 3.15 0.62 40.78 kg
10 0.10 1.00 31.00 2.10 0.62 40.13 kg
135.94 kg
Per m3 90.63 kg
BEKISTING Jumlah X Y H VOL
1.00 2.00 3.00 0.25 2.50 m2
Per m3 1.67 m2

BETON 1.50 m3
BESI 135.94 kg
BEKISTING 2.50 m2

B PEKERJAAN PONDASI BATU


TYPE L BESI L BETON AS
PL1 36.98 1
19.00
18.28
34.93
2.00
11.00
2.00
2.00
2.15
6.73
11.00
1.50
11.00
7.45
2.53
4.52
1.16
1.11
7.15
1.15
7.15
7.16
1.65
3.23
2.28
3.23
6.34
2.15
5.73
3.52
0.58
2.88

- 229.52 m'

PL1 L B H V
Galian Tana 229.52 0.80 0.85 156.07 m3
Urugan Pasir 229.52 0.80 0.05 9.18 m3
Pas Batu Ko 229.52 0.80 0.20 36.72 m3
Pas Batu Kal 229.52 0.53 0.60 72.30 m3
Urugan Tanah Kembali 37.87 m3

REKAPITULASI :
Galian Tana 156.07 m3
Urugan Pasir 9.18 m3
Pas Batu Ko 36.72 m3
Pas Batu Kal 72.30 m3
Urugan Tana 37.87 m3

C PEKERJAAN TIE BEAM


*) PEKERJAAN GALIAN TIE BEAM
TYPE L BESI L BETON AS
S1 32.40 22.74 1
24.20 16.73 2
30.40 20.35 3
30.20 20.50 4
19.40 14.50 A
19.03 12.62 B
17.93 11.45 C
16.05 9.52 D
13.26 8.55 E
99.40 5.58 F

302.27 142.54 m'

L B H V
Galian Tana 142.54 0.25 0.60 21.38 m3
Urugan Pasir 142.54 0.25 0.05 1.78 m3
Lantai Kerja 142.54 0.25 0.05 1.78 m3

TYPE L BESI L BETON AS


S2 4.71 3.70 1
3.48 1.48 3
5.13 3.58 4
3.65 2.65 G

16.96 11.40 m'

L B H V
Galian Tana 11.40 0.20 0.50 1.14 m3
Urugan Pasir 11.40 0.20 0.05 0.11 m3
Lantai Kerja 11.40 0.20 0.05 0.11 m3

TYPE L BESI L BETON AS


SP 2.15 2.00
11.15 9.81
2.15 1.85
2.15 1.85
2.65 2.35
11.15 10.25
7.23 6.48
1.65 1.30
10.65 10.05
7.50 6.75
2.76 2.31
5.03 4.58
1.65 1.35
1.65 1.35
7.65 7.35
1.65 1.35
7.65 7.05
7.65 7.05
2.15 1.85
3.73 3.28
2.85 2.55
3.73 3.43
2.65 2.35
6.23 5.78
4.15 3.85
1.15 0.70

120.74 108.85 m'

L B H V
Galian Tana 108.85 0.15 0.30 4.90 m3
Urugan Pasir 108.85 0.15 0.05 0.82 m3
Lantai Kerja 108.85 0.15 0.05 0.82 m3

REKAPITULA V
Galian Tana 27.42 m3
Urugan Pasir 2.71 m3
Lantai Kerja 2.71 m3

*) PEKERJAAN BETON BERTULANG TIE BEAM


TYPE L BESI L BETON
S1 302.27 142.54
302.27 m' 142.54 m'

Beton Bertulang Sloof L B H V


BETON S1 142.54 0.25 0.50 17.82 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 19 5.00 321.41 2.23 3,576.64 kg
BAWAH 19 4.00 321.41 2.23 2,861.31 kg
SENGKANG 10 0.18 815.51 1.36 0.62 683.76 kg
7,121.70 kg
Per m3 399.70 kg
BEKISTING L B H V
142.54 0.25 0.50 142.54 m2
Per m3 8.00 m2

BETON 17.82 m3
BESI 7,121.70 kg
BEKISTING 142.54 m2

TYPE L BESI L BETON AS


S2 16.96 11.40 B-C
16.96 m' 11.40 m'

Beton Bertulang Sloof L B H V


BETON S2 11.40 0.20 0.40 0.91 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 19 3.00 18.03 2.23 120.41 kg
BAWAH 19 3.00 18.03 2.23 120.41 kg
SENGKANG 10 0.18 66.14 1.06 0.62 43.22 kg
284.04 kg
Per m3 311.45 kg
BEKISTING L B H V
11.40 0.20 0.40 9.12 m2
Per m3 10.00 m2

BETON 0.91 m3
BESI 284.04 kg
BEKISTING 9.12 m2

TYPE L BESI L BETON AS


SP 120.74 108.85 B-C
120.74 m' 108.85 m'

Beton Bertulang Sloof L B H V


BETON SP 108.85 0.15 0.20 3.27 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 10 2.00 124.76 0.62 153.83 kg
BAWAH 10 2.00 124.76 0.62 153.83 kg
SENGKANG 6 0.15 726.63 0.56 0.22 90.31 kg
397.98 kg
Per m3 121.88 kg
BEKISTING L B H V
108.85 0.15 0.20 43.54 m2
Per m3 13.33 m2

BETON 3.27 m3
BESI 397.98 kg
BEKISTING 43.54 m2

1 PEKERJAAN BETON BERTULANG KOLOM


K.1 22.00 Buah H beton 4.15 m' H besi 4.87 m'
Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K1A 22.00 4.15 0.40 0.40 14.61 m3
AN BESI Tulangan Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 22.00 12.00 5.75 1.58 2,395.77 kg
Sengkang 10 0.13 22.00 34.20 1.46 0.62 677.23 kg
Sengkang 10 0.13 22.00 34.20 0.88 0.62 408.19 kg
3,481.19 kg
Per m3 238.31 kg
BEKISTING Jumlah B B' L V
22.00 0.40 0.40 4.15 146.08 m2
Per m3 10.00 m2

BETON 14.61 m3
PEMBESIAN 3,481.19 Kg
BEKISTING 146.08 m2

K.L 4.00 Buah H beton 4.15 m' H besi 4.87 m'


Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K1A 4.00 4.15 0.20 0.60 1.99 m3
AN BESI Tulangan Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 4.00 8.00 5.75 1.58 290.40 kg
Sengkang 10 0.13 4.00 34.20 1.06 0.62 89.40 kg
Sengkang 10 0.13 4.00 34.20 1.06 0.62 89.40 kg
469.19 kg
Per m3 235.54 kg
BEKISTING Jumlah B B' L V
4.00 0.20 0.60 4.15 26.56 m2
Per m3 13.33 m2

`` BETON 1.99 m3
PEMBESIAN 469.19 Kg
BEKISTING 26.56 m2

2 LANTAI 02

1 PEKERJAAN BETON BERTULANG KOLOM


K.1 22.00 Buah H beton 4.15 m' H besi 4.15 m'
Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K1A 22.00 4.15 0.40 0.40 14.61 m3
AN BESI Tulangan Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 22.00 12.00 5.03 1.58 2,095.78 kg
Sengkang 10 0.13 22.00 34.20 1.46 0.62 677.23 kg
Sengkang 10 0.13 22.00 34.20 0.88 0.62 408.19 kg
3,181.20 kg
Per m3 217.77 kg
BEKISTING Jumlah B B' L V
22.00 0.40 0.40 4.15 146.08 m2
Per m3 10.00 m2

BETON 14.61 m3
PEMBESIAN 3,181.20 Kg
BEKISTING 146.08 m2

K.L 4.00 Buah H beton 4.15 m' H besi 4.15 m'


Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K1 4.00 4.15 0.20 0.60 1.99 m3
AN BESI Tulangan Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 4.00 8.00 5.03 1.58 254.03 kg
Sengkang 10 0.13 4.00 34.20 1.06 0.62 89.40 kg
Sengkang 10 0.13 4.00 34.20 1.06 0.62 89.40 kg
432.83 kg
Per m3 217.28 kg
BEKISTING Jumlah B B' L V
4.00 0.20 0.60 4.15 26.56 m2
Per m3 13.33 m2

`` BETON 1.99 m3
PEMBESIAN 432.83 Kg
BEKISTING 26.56 m2

3 LANTAI 03

1 PEKERJAAN BETON BERTULANG KOLOM


K.1 22.00 Buah H beton 4.15 m' H besi 4.15 m'
Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K1 22.00 4.15 0.40 0.40 14.61 m3
AN BESI Tulangan Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 22.00 12.00 5.03 1.58 2,095.78 kg
Sengkang 10 0.13 22.00 34.20 1.46 0.62 677.23 kg
Sengkang 10 0.13 22.00 34.20 0.88 0.62 408.19 kg
3,181.20 kg
Per m3 217.77 kg
BEKISTING Jumlah B B' L V
22.00 0.40 0.40 4.15 146.08 m2
Per m3 10.00 m2

BETON 14.61 m3
PEMBESIAN 3,181.20 Kg
BEKISTING 146.08 m2

K.L 4.00 Buah H beton 4.15 m' H besi 4.15 m'


Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K1A 4.00 4.15 0.20 0.60 1.99 m3
AN BESI Tulangan Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 4.00 8.00 5.03 1.58 254.03 kg
Sengkang 10 0.13 4.00 34.20 1.06 0.62 89.40 kg
Sengkang 10 0.13 4.00 34.20 1.06 0.62 89.40 kg
432.83 kg
Per m3 217.28 kg
BEKISTING Jumlah B B' L V
4.00 0.20 0.60 4.15 26.56 m2
Per m3 13.33 m2

`` BETON 1.99 m3
PEMBESIAN 432.83 Kg
BEKISTING 26.56 m2

3 LANTAI Atap

1 PEKERJAAN BETON BERTULANG KOLOM


K.L 4.00 Buah H beton 3.50 m' H besi 3.50 m'
Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K1A 4.00 3.50 0.20 0.60 1.68 m3
AN BESI Tulangan Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 4.00 8.00 4.38 1.58 221.21 kg
Sengkang 10 0.13 4.00 29.00 1.06 0.62 75.80 kg
Sengkang 10 0.13 4.00 29.00 1.06 0.62 75.80 kg
372.82 kg
Per m3 221.91 kg
BEKISTING Jumlah B B' L V
4.00 0.20 0.60 3.50 22.40 m2
Per m3 13.33 m2

`` BETON 1.68 m3
PEMBESIAN 372.82 Kg
BEKISTING 22.40 m2

PEKERJAAN BALOK DAN PLAT LANTAI

1 LANTAI 02

1 PEKERJAAN BETON BERTULANG BALOK SFL.+4.00


TYPE L BESI L BETON AS
B.1A 36.76 35.12 1
B.1A 24.60 22.46 2
B.1A 6.00 5.60 3
B.1A 30.00 28.00 4
B.1A 19.00 17.80 A
B.1A 6.63 6.23 B
B.1A 5.53 5.13 C
B.1A 3.65 3.25 D
B.1A 9.00 8.20 F
B.1A 10.92 8.87 G

152.09 m' 140.66 m'

Beton Bertulang Balok L B H V


BETON B.1A 140.66 0.30 0.55 23.21 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 5.50 160.20 1.58 1,390.60 kg
BAWAH 16 5.00 160.20 1.58 1,264.18 kg
PINGGANG 10 2.00 160.20 0.62 197.53 kg
SENGKANG A 10 0.13 1,126.28 2.06 0.62 1,430.36 kg
4,282.67 kg
Per m3 184.53 kg
BEKISTING L B H V
140.66 0.30 0.55 196.92 m2
Per m3 8.48 m2

BETON 23.21 m3
BESI 4,282.67 kg
BEKISTING 196.92 m2

TYPE L BESI L BETON AS


B.2 4.92 4.52 4
B.2 12.86 12.06 E
B.2 11.70 11.32 E-F

29.48 m' 27.90 m'

Beton Bertulang Balok L B H V


BETON B.2 27.90 0.25 0.55 3.84 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 4.00 31.05 1.58 196.03 kg
BAWAH 16 4.00 31.05 1.58 196.03 kg
PINGGANG 10 2.00 31.05 0.62 38.29 kg
SENGKANG A 10 0.13 224.20 1.96 0.62 270.91 kg
701.26 kg
Per m3 182.80 kg
BEKISTING L B H V
27.90 0.25 0.55 37.67 m2
Per m3 9.82 m2

BETON 3.84 m3
BESI 701.26 kg
BEKISTING 37.67 m2

TYPE L BESI L BETON AS


B.3 23.80 22.70 3
B.3 12.00 11.30 B
B.3 12.00 11.30 C
B.3 12.00 11.30 D
B.3 7.95 7.68 D-E
B.3 11.00 8.82 F-G

78.75 m' 73.10 m'

Beton Bertulang Balok L B H V


BETON B.3 73.10 0.20 0.40 5.85 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 3.00 82.95 1.58 392.75 kg
BAWAH 16 2.50 82.95 1.58 327.29 kg
SENGKANG A 8 0.13 585.80 1.41 0.39 325.90 kg
1,045.93 kg
Per m3 178.85 kg
BEKISTING L B H V
73.10 0.20 0.40 73.10 m2
Per m3 12.50 m2

BETON 5.85 m3
BESI 1,045.93 kg
BEKISTING 73.10 m2

TYPE L BESI L BETON AS


B.5 14.64 14.76 1
B.5 12.97 12.97 4

27.61 m' 27.73 m'

Beton Bertulang Balok L B H V


BETON B.5 27.73 0.15 0.40 1.66 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 2.00 29.08 1.58 91.80 kg
BAWAH 16 2.00 29.08 1.58 91.80 kg
SENGKANG A 8 0.13 222.84 1.31 0.39 115.18 kg
298.78 kg
Per m3 179.58 kg
BEKISTING L B H V
27.73 0.15 0.40 26.34 m2
Per m3 15.83 m2

BETON 1.66 m3
BESI 298.78 kg
BEKISTING 26.34 m2

TYPE L BESI L BETON AS


B.p 35.48 33.34 1-2
B.P 44.00 41.28 2-3
B.P 63.00 59.68 3-4

142.48 m' 134.30 m'

Beton Bertulang Balok L B H V


BETON B.p 134.30 0.15 0.20 4.03 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 10 2.00 147.23 0.62 181.53 kg
BAWAH 10 2.00 147.23 0.62 181.53 kg
SENGKANG A 8 0.15 896.33 0.71 0.39 251.10 kg
614.16 kg
Per m3 152.44 kg
BEKISTING L B H V
134.30 0.15 0.20 73.87 m2
Per m3 18.33 m2

BETON 4.03 m3
BESI 614.16 kg
BEKISTING 73.87 m2

2 PEKERJAAN BETON BERTULANG PLAT SFL.-0.10m

TYPE LUAS BESI LUAS BETON


S1 505.76 410.58
tebal 0.12 0.12
Volume 60.69 m3 49.27 m3

Beton Bertulang Plat S1 X Y H V


BETON S1 4.00 4.00 0.12 1.92 m3

AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 149.24 kg
BEKISTING P L H V
4.00 4.00 0.12 17.92 m2
Per m3 9.33 m2

BETON 49.27 m3
BESI 9,057.82 kg
BEKISTING 459.85 m2

TYPE LUAS BESI LUAS BETON


S2 13.36 9.40
tebal 0.10 0.10
Volume 1.34 m3 0.94 m3

Beton Bertulang Plat S1 X Y H V


BETON S2 4.00 4.00 0.10 1.60 m3

AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 8 0.15 27.67 4.20 0.39 45.85 kg
b2 (X) 8 0.15 27.67 4.20 0.39 45.85 kg
b1 (Y) 8 0.15 27.67 4.20 0.39 45.85 kg
b2 (Y) 8 0.15 27.67 4.20 0.39 45.85 kg
183.39 kg
Per m3 114.62 kg
BEKISTING P L H V
4.00 4.00 0.10 17.60 m2
Per m3 11.00 m2

BETON 0.94 m3
BESI 153.13 kg
BEKISTING 10.34 m2

2 LANTAI 03

1 PEKERJAAN BETON BERTULANG BALOK SFL.+4.00

TYPE L BESI L BETON AS


B.1A 36.76 34.88 1
B.1A 29.87 27.91 2
B.1A 30.00 28.00 4
B.1A 19.00 17.80 A
B.1A 6.63 6.24 B
B.1A 5.54 5.13 C
B.1A 3.65 3.25 D
B.1A 9.00 8.20 F
B.1A 9.64 7.70 F-G

150.09 m' 139.11 m'

Beton Bertulang Balok L B H V


BETON B.1A 139.11 0.30 0.55 22.95 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 5.50 158.09 1.58 1,372.31 kg
BAWAH 16 5.00 158.09 1.58 1,247.56 kg
PINGGANG 10 2.00 158.09 0.62 194.93 kg
SENGKANG A 10 0.13 1,113.88 2.06 0.62 1,414.62 kg
4,229.42 kg
Per m3 184.26 kg
BEKISTING L B H V
139.11 0.30 0.55 194.75 m2
Per m3 8.48 m2

BETON 22.95 m3
BESI 4,229.42 kg
BEKISTING 194.75 m2
TYPE L BESI L BETON AS
B.2 4.92 4.52 4
B.2 12.86 11.99 E
B.2 11.70 11.32 E-F

29.48 m' 27.83 m'

Beton Bertulang Balok L B H V


BETON B.2 27.83 0.25 0.55 3.83 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 4.00 31.05 1.58 196.03 kg
BAWAH 16 4.00 31.05 1.58 196.03 kg
PINGGANG 10 2.00 31.05 0.62 38.29 kg
SENGKANG A 10 0.13 223.64 1.96 0.62 270.23 kg
700.58 kg
Per m3 183.08 kg
BEKISTING L B H V
27.83 0.25 0.55 37.57 m2
Per m3 9.82 m2

BETON 3.83 m3
BESI 700.58 kg
BEKISTING 37.57 m2

TYPE L BESI L BETON AS


B.3 12.00 11.35 3
B.3 20.00 18.99 2-4
B.3 12.00 11.30 B
B.3 12.00 11.30 C
B.3 6.37 4.90 F-G

62.37 m' 57.84 m'

Beton Bertulang Balok L B H V


BETON B.3 57.84 0.20 0.40 4.63 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 3.00 65.70 1.58 311.05 kg
BAWAH 16 2.50 65.70 1.58 259.21 kg
SENGKANG A 8 0.13 463.72 1.41 0.39 257.98 kg
828.25 kg
Per m3 179.00 kg
BEKISTING L B H V
57.84 0.20 0.40 57.84 m2
Per m3 12.50 m2

BETON 4.63 m3
BESI 828.25 kg
BEKISTING 57.84 m2

TYPE L BESI L BETON AS


B.5 14.64 14.76 1
B.5 12.97 12.97 4

27.61 m' 27.73 m'

Beton Bertulang Balok L B H V


BETON B.5 27.73 0.15 0.40 1.66 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 2.00 29.08 1.58 91.80 kg
BAWAH 16 2.00 29.08 1.58 91.80 kg
SENGKANG A 8 0.13 222.84 1.31 0.39 115.18 kg
298.78 kg
Per m3 179.58 kg
BEKISTING L B H V
27.73 0.15 0.40 26.34 m2
Per m3 15.83 m2

BETON 1.66 m3
BESI 298.78 kg
BEKISTING 26.34 m2
TYPE L BESI L BETON AS
B.p 36.62 35.10 1-2
B.P 22.00 20.62 2-3
B.P 26.00 24.62 3-4

84.62 m' 80.34 m'

Beton Bertulang Balok L B H V


BETON B.p 80.34 0.15 0.20 2.41 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 10 2.00 87.44 0.62 107.81 kg
BAWAH 10 2.00 87.44 0.62 107.81 kg
SENGKANG A 8 0.15 536.60 0.71 0.39 150.32 kg
365.95 kg
Per m3 151.83 kg
BEKISTING L B H V
80.34 0.15 0.20 44.19 m2
Per m3 18.33 m2

BETON 2.41 m3
BESI 365.95 kg
BEKISTING 44.19 m2

2 PEKERJAAN BETON BERTULANG PLAT SFL.-0.10m

TYPE LUAS BESI LUAS BETON


S1 505.76 410.58
tebal 0.12 0.12
Volume 60.69 m3 49.27 m3

Beton Bertulang Plat S1 X Y H V


BETON S1 4.00 4.00 0.12 1.92 m3

AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 149.24 kg
BEKISTING P L H V
4.00 4.00 0.12 17.92 m2
Per m3 9.33 m2

BETON 49.27 m3
BESI 9,057.82 kg
BEKISTING 459.85 m2

2 LANTAI ATAP DAK

1 PEKERJAAN BETON BERTULANG BALOK SFL.+4.00

TYPE L BESI L BETON AS


B.1A 36.76 34.88 1
B.1A 29.87 27.91 2
B.1A 30.00 28.00 4
B.1A 7.00 6.60 A
B.1A 6.64 6.24 B
B.1A 5.53 5.13 C
B.1A 3.65 3.24 D
B.1A 9.00 8.20 F
B.1A 10.92 8.87 F-G

139.37 m' 129.07 m'

Beton Bertulang Balok L B H V


BETON B.1A 129.07 0.30 0.55 21.30 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 5.50 146.80 1.58 1,274.30 kg
BAWAH 16 5.00 146.80 1.58 1,158.45 kg
PINGGANG 10 2.00 146.80 0.62 181.01 kg
SENGKANG A 10 0.13 1,033.56 2.06 0.62 1,312.61 kg
3,926.37 kg
Per m3 184.37 kg
BEKISTING L B H V
129.07 0.30 0.55 180.70 m2
Per m3 8.48 m2

BETON 21.30 m3
BESI 3,926.37 kg
BEKISTING 180.70 m2

TYPE L BESI L BETON AS


B.2 4.92 4.52 4
B.2 12.86 12.06 E
B.2 11.70 11.32 E-F

29.48 m' 27.90 m'

Beton Bertulang Balok L B H V


BETON B.2 27.90 0.25 0.55 3.84 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 4.00 31.05 1.58 196.03 kg
BAWAH 16 4.00 31.05 1.58 196.03 kg
PINGGANG 10 2.00 31.05 0.62 38.29 kg
SENGKANG A 10 0.13 224.20 1.96 0.62 270.91 kg
701.26 kg
Per m3 182.80 kg
BEKISTING L B H V
27.90 0.25 0.55 37.67 m2
Per m3 9.82 m2

BETON 3.84 m3
BESI 701.26 kg
BEKISTING 37.67 m2

TYPE L BESI L BETON AS


B.3 20.00 18.99 2-4
B.3 42.45 39.19 4

62.45 m' 58.18 m'

Beton Bertulang Balok L B H V


BETON B.3 58.18 0.20 0.40 4.65 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 3.00 65.78 1.58 311.45 kg
BAWAH 16 2.50 65.78 1.58 259.54 kg
SENGKANG A 8 0.13 466.44 1.41 0.39 259.49 kg
830.49 kg
Per m3 178.43 kg
BEKISTING L B H V
58.18 0.20 0.40 58.18 m2
Per m3 12.50 m2

BETON 4.65 m3
BESI 830.49 kg
BEKISTING 58.18 m2

TYPE L BESI L BETON AS


B.p 36.62 35.10 1-2
B.P 11.00 10.42 E-F

47.62 m' 45.52 m'

Beton Bertulang Balok L B H V


BETON B.p 45.52 0.15 0.20 1.37 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 10 2.00 49.21 0.62 60.67 kg
BAWAH 10 2.00 49.21 0.62 60.67 kg
SENGKANG A 8 0.15 304.47 0.71 0.39 85.29 kg
206.64 kg
Per m3 151.32 kg
BEKISTING L B H V
45.52 0.15 0.20 25.04 m2
Per m3 18.33 m2

BETON 1.37 m3
BESI 206.64 kg
BEKISTING 25.04 m2

2 PEKERJAAN BETON BERTULANG PLAT SFL.-0.10m

TYPE LUAS BESI LUAS BETON


S1 287.73 262.41
tebal 0.12 0.12
Volume 34.53 m3 31.49 m3

Beton Bertulang Plat S1 X Y H V


BETON S1 4.00 4.00 0.12 1.92 m3

AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 149.24 kg
BEKISTING P L H V
4.00 4.00 0.12 17.92 m2
Per m3 9.33 m2

BETON 31.49 m3
BESI 5,153.05 kg
BEKISTING 293.90 m2

TYPE LUAS BESI LUAS BETON


S2 27.19 21.12
tebal 0.10 0.10
Volume 2.72 m3 2.11 m3

Beton Bertulang Plat S1 X Y H V


BETON S2 4.00 4.00 0.10 1.60 m3

AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 179.09 kg
BEKISTING P L H V
4.00 4.00 0.10 17.60 m2
Per m3 11.00 m2

BETON 2.11 m3
BESI 486.87 kg
BEKISTING 23.23 m2

PEKERJAAN TANGGA
1 PEKERJAAN TANGGA AS 1-2/A
*) PER LANTAI (LT. DASAR - LT.ATAP)
1 - 2
2 - 3
3 - atap

BETON
Jml Luasan Lebar Vol
Anak Tangga 22.00 0.08 1.40 2.41 m3
Plat Bordes 1.00 0.15 4.20 0.63 m3
3.04 m3
PEMBESIAN
L 1.50 m'
Tulangan Berat tul
ANAK TANGGA Jumlah Ʃ Tulangan Panjang (m) V
ø Jarak (m) (kg/m)
PLAT TANGGA '+0.00 sd +2.00
anak tangga a. D10-150 10 0.15 22.00 10.00 0.87 0.62 117.32 kg
plat tangga B. D16-150 16 0.15 1.00 10.00 5.29 1.58 83.49 kg
plat tangga B. D16-151 16 0.15 1.00 10.00 8.60 1.58 135.68 kg
plat tangga C. D10-150 10 0.15 1.00 28.80 1.50 0.62 26.63 kg
plat tangga C. D10-150 10 0.15 1.00 28.80 1.50 0.62 26.63 kg
anak tangga D. 1 D10 10 - 22.00 1.00 1.50 0.62 20.34 kg

PLAT BORDES + 2.00


A. D10-150 10 0.15 1.00 21.33 3.36 0.62 44.19 kg
B. D10-150 10 0.15 1.00 21.33 3.11 0.62 40.90 kg

PLAT TANGGA ' +2.00 sd +4.00


anak tangga a. D10-150 10 0.15 11.00 10.00 0.87 0.62 58.66 kg
plat tangga B. D16-150 16 0.15 1.00 10.00 5.29 1.58 83.49 kg
plat tangga B. D16-151 16 0.15 1.00 10.00 8.60 1.58 135.68 kg
plat tangga C. D10-150 10 0.15 1.00 10.47 1.50 0.62 9.68 kg
plat tangga C. D10-150 10 0.15 1.00 10.47 1.50 0.62 9.68 kg
anak tangga D. 1 D10 10 - 11.00 1.00 1.50 0.62 10.17 kg
802.55 kg

BEKISTING
+0.00 sd +2.00 jml P L VOL
bwh anak tangga 3.49 1.50 5.24 m2
depan anak tangga 22 1.42 0.18 5.62 m2
bwh bordes 2.30 2.85 6.56 m2
samping bordes 4.60 0.15 1.38 m2
samping 1.00 22.00 22.00 m2
samping 1.00 22.00 22.00 m2

+2.00 sd +4.00
bwh anak tangga 3.49 1.50 5.24 m2
depan anak tangga 11 1.42 0.18 2.81 m2
samping 1.00 22.00 22.00 m2
samping 1.00 22.00 22.00 m2
114.84 M2

PLAT TANGGA :
BETON 4.00 m3
PEMBESIAN 802.55 kg
BEKISTING 114.84 m2

*) BALOK BORDES
TYPE L BESI L BETON AS
BB 3.50 2.80 1
3.50 2.80

Beton Bertulang Balok L B H V


BETON BB 2.80 0.25 0.40 0.28 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 16 3.50 3.69 1.58 20.36 kg
BAWAH 16 3.50 3.69 1.58 20.36 kg
SENGKANG 10 0.09 1.00 1.11 0.62 0.68 kg
41.41 kg
Per m3 147.91 kg
BEKISTING L B H V
2.80 0.25 0.40 2.94 m2
Per m3 10.50 m2

BALOK BORDES :
BETON 0.28 m3
PEMBESIAN 41.41 kg
BEKISTING 2.94 m2
K.BORDES 1.00 Buah H beton 2.10 m' H besi 2.70 m'
Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K6 1.00 2.10 0.25 0.30 0.16 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 1.00 8.00 3.34 1.58 42.17 kg
Sengkang 10 0.13 1.00 17.80 0.96 0.62 10.53 kg
52.71 kg
Per m3 334.64 kg
BEKISTING Jumlah B B' L V
1.00 0.25 0.30 2.10 2.31 m2
Per m3 14.67 m2

BETON 0.16 m3
PEMBESIAN 52.71 Kg
BEKISTING 2.31 m2

2 PEKERJAAN LIFT

TYPE L BESI L BETON AS


B.S 3.10 2.10
B.S 3.80 2.80

6.90 m' 4.90 m'

Beton Bertulang Balok L B H V


BETON B.S 4.90 0.20 0.30 0.29 m3
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 2.00 7.20 1.04 15.00 kg
BAWAH 13 2.00 7.20 1.04 15.00 kg
SENGKANG A 8 0.15 33.67 1.11 0.39 14.74 kg
44.75 kg
Per m3 152.20 kg
BEKISTING L B H V
4.90 0.20 0.30 3.92 m2
Per m3 13.33 m2

BETON 0.29 m3
BESI 44.75 kg
BEKISTING 3.92 m2

PEKERJAAN ATAP
*) RANGKA BAJA
URAIAN BAHAN JML L KG/M VOL
KK.1 IWF 200X100X5,5X8 3.00 13.71 21.30 876.07 kg
Plat Plendes plat 8 mm 6.00 0.08 62.80 29.84 kg
Angkur 19 MM 24.00 0.44 2.23 23.50 kg
Batang Tarik ∅ 16 MM 3.00 13.70 1.58 64.87 kg
Besi Penggantung ∅ 10 MM 15.00 2.96 0.62 27.37 kg
Gording C125X50X20X2.3 12.00 24.65 5.00 1,477.82 kg
Jarum Gording ∅ 10 mm 12.00 104.00 0.62 769.39 kg
Ikatan Angin ∅ 16 mm 8.00 19.50 1.58 246.21 kg
Perlengkapan & Aksesoris (mur baut, plat buhul, walter mur, dll) (5%) 175.75 kg
JUMLAH TOTAL = 3,690.82 kg

*) GUNUNGAN
Pas Bata 12.54 m2
Pekerjaan Beton :
Balok 24.58 m'
Kolom 5.03 m'
Plesteran 31.10 m2
Acian 31.10 m2
Pengecatan 31.10 m2

*) PENUTUP ATAP
ZINCALUME
P L VOL
24.65 12.74 314.04 m2

NOK 24.65 m'


A B UP ARS LANTAI 1

NO NAMA RUANG LUAS KELILING L PINTU


1 R. PENGEMBANGAN LAB 108.12 49.21 -
2 R. GANTI 6.50 12.34 0.90
3 R. RO 2 27.09 23.20 3.50
4 LAV 2.45 6.70 0.90
5 R. RO 1 27.14 22.90 2.60
6 LAV 2.50 6.40 0.90
7 R OPERATOR 52.39 43.55 3.60
8 R. RADOIGRAFER 6.70 10.40 1.80
9 LAV 2.81 6.75 0.90
10 R MESIN 5.99 10.88 0.90
11 R. CT SCAN 39.99 25.70 1.60
12 MAMOGRAPHY 22.97 20.24 1.70
13 R PANEL 7.62 13.20 1.40
14 R. TUNGGU 81.81 51.50 13.80
15 LAV 2.50 6.40 0.90
16 A. INS RADIOLOGI 16.61 16.55 1.40
17 LAV 3.17 7.40 0.90
18 USG BACA 18.32 17.55 1.40
19 SELASAR TANGGA 32.56 26.75 4.50
20 LIFT 8.88 12.10 1.40

21 SHAFT 0.36 3.35


22 SHAFT 0.40 2.74
23 SHAFT 0.40 2.73
24 SHAFT 0.42 2.60
25 SHAFT 0.42 2.60
26 SHAFT 1.28 8.10
27 SHAFT 0.42 2.60
28 SHAFT 0.42 2.60
29 SHAFT 0.42 2.60
30 SHAFT 0.42 2.60
31 SHAFT 0.58 3.99

32 KKL 115.70

JUMLAH 481.65 541.92 45.00

PEKERJAAN LANTAI TEBAL LUAS VOLUME


URUGAN PASIR 0.05 481.65 24.08
RABAT LANTAI 0.07 481.65 33.72

Pekerjaan Dinding L H
Pasangan Dinding 0.50 109.69 3.00

RINGBALK 0.50 109.69


KOLOM PRAKTIS 109.69 4.00

B UP TANGGA
JML AREA VOL
RAILLING TANGGA 1.00 31.64 31.64
WALL GUARD 14.39

B B UP ARS LANTAI 2

NO NAMA RUANG LUAS KELILING L PINTU


1 KORIDOR JENGUK 1 16.66 17.40 4.50
2 LAV 2.16 5.90 0.90
3 LAV 2.16 5.90 0.90
4 RAWAT 174.35 72.00 3.50
5 NURSE STATION 27.85 28.56 4.50
6 ICU UNFEKSIUS 1 13.80 15.55 2.30
7 ICU UNFEKSIUS 2 13.80 15.55 2.30
8 R. ANTARA 9.21 9.48 3.40
9 SELLASAR PANTRY 9.71 20.05 5.40
10 PANTRY 3.51 7.90 0.80
11 SPOEL HOEK 3.51 7.90 0.90
12 R. PERAWAT 10.66 13.66 0.90
13 LOCER 6.77 11.18 2.70
14 LAV 24.98 6.40 0.90
15 KORIDOR JENGUK TANGGA 152.43 147.97 8.90
16 R PANEL 7.62 13.20 1.40
17 LIFT 8.88 12.10 1.40

18 SHAFT 0.36 3.35


19 SHAFT 0.40 2.74
20 SHAFT 0.40 2.73
21 SHAFT 0.42 2.60
22 SHAFT 0.42 2.60
23 SHAFT 1.28 8.10
24 SHAFT 0.42 2.60
25 SHAFT 0.42 2.60
26 SHAFT 0.42 2.60
27 SHAFT 0.42 2.60
28 SHAFT 0.58 3.99

29 KKL 118.30

JUMLAH 493.57 565.51 45.60

PEKERJAAN LANTAI TEBAL LUAS VOLUME


URUGAN PASIR 0.05 493.57 24.68

Pekerjaan Dinding L H
Pasangan Dinding 0.50 110.99 3.00

RINGBALK 0.50 110.99


KOLOM PRAKTIS 110.99 4.00

B UP TANGGA
JML AREA VOL
RAILLING TANGGA 1.00 31.64 31.64
WALL GUARD 48.76

C B UP ARS LANTAI 3

NO NAMA RUANG LUAS KELILING L PINTU


1 OK 1 48.59 28.15 1.48
2 OK 2 40.03 25.70 1.48
3 OK 3 40.03 25.70 1.48
4 SELASAR 51.28 42.96 6.13
5 SELASAR 2 32.93 30.40 7.58
6 ALAT STERIL 22.29 25.35 2.70
7 R. PERSIAPAN 28.94 21.90 1.48
8 R. DISKUSI 10.90 13.60 0.90
9 SPOEL HOEK 3.21 7.17 0.90
10 RECOVERY ROOM 27.33 21.81 3.40
11 TRANSFER 11.23 16.55 5.20
12 R DOKTER 7.56 12.05 0.99
13 LAV 1.94 5.80 0.80
14 LOKER WANITA 5.05 9.00 1.80
15 LAV 2.47 6.80 0.88
16 LOKER GANTI PRIA 4.77 8.90 0.90
17 LAV 1.89 5.70 0.90
18 ANTARA 7.19 14.50 6.10
19 R OBAT 4.33 8.55 0.90
20 R. ONSUL 9.55 12.40 1.80
21 KORIDOR KOTOR 53.80 82.40 1.80
22 HALL TANGGA 56.90 45.10 6.60
23 R PANEL 7.62 13.20 1.40
24 LIFT 8.88 12.10 1.40

24 SHAFT 0.36 3.35


25 SHAFT 0.40 2.74
26 SHAFT 0.40 2.73
27 SHAFT 0.42 2.60
28 SHAFT 0.42 2.60
29 SHAFT 1.28 8.10
30 SHAFT 0.42 2.60
31 SHAFT 0.42 2.60
32 SHAFT 0.42 2.60
33 SHAFT 0.42 2.60
34 SHAFT 0.58 3.99

35 KKL 118.30

JUMLAH 494.24 650.60 58.97

PEKERJAAN LANTAI TEBAL LUAS VOLUME


URUGAN PASIR 0.05 494.24 24.71
Pekerjaan Dinding L H
Pasangan Dinding 0.50 650.60 3.00

RINGBALK 0.50 650.60


KOLOM PRAKTIS 650.60 4.00

B UP TANGGA
JML AREA VOL

RAILLING TANGGA 1.00 31.64 31.64

D B UP ARS LANTAI ATAP

NO NAMA RUANG LUAS KELILING L PINTU


1 TANGGA 38.62 29.60 0.90
2 RUMAH LIFT 12.50 15.15 0.90

3 KKL 31.25

JUMLAH 51.12 76.00 1.80

PEKERJAAN LANTAI TEBAL LUAS VOLUME


URUGAN PASIR 0.05 51.12 2.56

Pekerjaan Dinding L H
Pasangan Dinding 0.50 76.00 3.00

RINGBALK 0.50 76.00


KOLOM PRAKTIS 76.00 4.00

D BACK UP KUSEN :
NO TYPE KUSEN JUMLAH
LT.1 LT.2 LT.3
1 Type PU1 1.00 - -
2 Type P1 - - -
3 Type P2 - - 5.00
4 Type P3 - - 12.00
5 Type P4 - - 4.00
6 Type P5 - - 1.00
7 Type P6 - - 1.00
8 Type P.O - - 3.00
9 Type PS 11.00 11.00 11.00
10 Type AG - - 12.00
11 Type WW1 4.00 5.00 2.00
12 Type WW2 1.00 1.00 1.00
13 Type WW3 - 2.00 2.00
14 Type WW4 2.00 2.00 2.00
15 Type WW5 - 1.00 1.00
16 Type BV1 4.00 3.00 5.00
17 Type BV2 2.00 2.00 1.00
18 Type BV3 - 2.00 8.00
19 Type BV2a - - 2.00
20 Type BV3a 5.00 1.00 6.00

E BACK UP SANITAIR
B UP ARS LANTAI 1
KRAN
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG

1 R. PENGEMBANGAN LAB
2 R. GANTI
3 R. RO 2
4 LAV 1.00 1.00
5 R. RO 1
6 LAV 1.00 1.00
7 R OPERATOR
8 R. RADOIGRAFER
9 LAV 1.00 1.00
10 R MESIN
11 R. CT SCAN
12 MAMOGRAPHY
13 R PANEL
14 R. TUNGGU
15 LAV 1.00 1.00
16 A. INS RADIOLOGI
17 LAV 1.00 1.00
18 USG BACA
19 SELASAR TANGGA
20 LIFT

21 SHAFT
22 SHAFT
23 SHAFT
24 SHAFT
25 SHAFT
26 SHAFT
27 SHAFT
28 SHAFT
29 SHAFT
30 SHAFT
31 SHAFT

32 KKL

JUMLAH 5.00 5.00 -

B UP ARS LANTAI 2
KRAN
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG

1 KORIDOR JENGUK 1
2 LAV 1.00 1.00
3 LAV 1.00 1.00
4 RAWAT
5 NURSE STATION
6 ICU UNFEKSIUS 1
7 ICU UNFEKSIUS 2
8 R. ANTARA
9 SELLASAR PANTRY
10 PANTRY 1.00
11 SPOEL HOEK 2.00 2.00
12 R. PERAWAT
13 LOCER
14 LAV 1.00 1.00
15 KORIDOR JENGUK TANGGA
16 R PANEL
17 LIFT

18 SHAFT
19 SHAFT
20 SHAFT
21 SHAFT
22 SHAFT
23 SHAFT
24 SHAFT
25 SHAFT
26 SHAFT
27 SHAFT
28 SHAFT

29 KKL

JUMLAH 5.00 4.00 2.00

B UP ARS LANTAI 3
KRAN
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG

1 OK 1
2 OK 2
3 OK 3
4 SELASAR
5 SELASAR 2
6 ALAT STERIL
7 R. PERSIAPAN
8 R. DISKUSI
9 SPOEL HOEK 1.00 1.00
10 RECOVERY ROOM
11 TRANSFER
12 R DOKTER
13 LAV 1.00 1.00
14 LOKER WANITA
15 LAV 1.00
16 LOKER GANTI PRIA
17 LAV 1.00
18 ANTARA
19 R OBAT
20 R. ONSUL
21 KORIDOR KOTOR
22 HALL TANGGA
23 R PANEL
24 LIFT

24 SHAFT
25 SHAFT
26 SHAFT
27 SHAFT
28 SHAFT
29 SHAFT
30 SHAFT
31 SHAFT
32 SHAFT
33 SHAFT
34 SHAFT

35 KKL

JUMLAH 2.00 4.00 -


FINISHING LANTAI FINISHING D
LIST
PLINT H PLINT GT 60 X 60 KR 30 X 30 VYNIL TINGGI
49.21 49.21 108.12
11.44 11.44 6.50
19.70 19.70 27.09 3.00
5.80 2.45 2.80
20.30 20.30 27.14 3.00
5.50 2.50 2.80
39.95 39.95 52.39
8.60 8.60 6.70
5.85 2.81
9.98 9.98 5.99
24.10 24.10 39.99 3.00
18.54 18.54 22.97 3.00
11.80 11.80 7.62
37.70 37.70 81.81
5.50 2.50 2.80
15.15 15.15 16.61
6.50 3.17 2.80
16.15 16.15 18.32
22.25 22.25 39.04
10.70

344.71 304.86 - 460.28 13.43 - 23.20

MEJA COUNTER
M3 PENDAFTARAN
M3

VOL
329.06 m2 263.24

54.84 m'
82.26 m'

B UP RAILLING FINISH CAT DUCO


SAT.
TAMPAK 1 54.00 m'
m' TAMPAK 2
M' TAMPAK 3 40.00 m'
TAMPAK 4 60.00 m'

FINISHING LANTAI FINISHING D


LIST
PLINT H PLINT GT 60 X 60 KR 30 X 30 VYNIL TINGGI
12.90 12.90 16.66
5.00 2.16 2.80
5.00 2.16 2.80
68.50 68.50 174.35
24.06 24.06 27.85
13.25 13.25 13.80
13.25 13.25 13.80
6.08 6.08 9.21
14.65 14.65 9.71
7.10 7.10 3.51 1.80
7.00 3.51 2.80
12.76 12.76 10.66
8.48 8.48 6.77
5.50 24.98
139.07 139.07 158.91
11.80 11.80 7.62
10.70

365.10 331.90 - 452.83 32.81 - 10.20

MEJA COUNTER
M3 PENDAFTARAN

VOL
332.96 m2 266.36

55.49 m'
83.24 m'

SAT.
m'
M'

FINISHING LANTAI FINISHING D


LIST
PLINT H PLINT GT 60 X 60 KR 30 X 30 VYNIL TINGGI
26.68 26.68 48.59 3.00
24.23 24.23 40.03 3.00
24.23 24.23 40.03 3.00
36.84 36.84 51.28
22.83 22.83 32.93
22.65 22.65 22.29
20.43 20.43 28.94
12.70 12.70 10.90
6.27 6.27 1.80
18.41 18.41 27.33
11.35 11.35 11.23
11.06 11.06 7.56
5.00 1.94 2.80
7.20 7.20 5.05
5.92 2.47 2.80
8.00 4.77 8.00
4.80 1.89 2.80
8.40 8.40 7.19
7.65 7.65 4.33
10.60 10.60 9.55
80.60 80.60 53.80
38.50 38.50 63.38
11.80 11.80 7.62
10.70

436.82 325.77 75.13 351.37 12.57 128.65 19.20

M3
VOL
1,951.80 m2

325.30 m'
487.95 m'

SAT.

m'

FINISHING LANTAI FINISHING D


LIST
PLINT H PLINT GT 60 X 60 KR 30 X 30 VYNIL TINGGI
28.70 17.13 24.42
14.25

42.95 17.13 - 24.42 - - -

M3

VOL
228.00 m2

38.00 m'
57.00 m'

H LUAS LATIU SPONENG LT.1


LT. ATAP LUAS LATIU
- 15.00 5.30 22.00 15.00 5.30
- 4.76 2.00 14.60 - -
- 4.76 2.00 14.60 - -
1.00 2.52 1.20 13.00 - -
- 2.54 1.20 13.20 - -
- 3.92 1.70 14.00 - -
- 3.18 1.50 13.00 - -
- 3.40 - 11.90 - -
- 0.91 - 8.00 10.01 -
- 0.35 - 4.80 - -
- 12.95 4.92 29.70 51.80 19.68
- 8.12 3.20 22.80 8.12 3.20
- 4.20 1.80 11.20 - -
- 7.21 2.87 21.50 14.42 5.74
- 10.57 4.07 26.30 - -
- 0.51 0.98 5.70 2.04 3.92
- 1.20 1.90 9.40 2.40 3.80
- 1.50 2.30 11.00 - -
- 1.11 1.80 8.96 - -
- 1.35 2.10 10.22 6.75 10.50

110.54 52.14

CLOSET WASTAFEL
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

5.00 5.00 5.00 - - - -

CLOSET WASTAFEL
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN

1.00 1.00 1.00


1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00

3.00 3.00 1.00 2.00 0.00 1.00 1.00

CLOSET WASTAFEL
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN

1.00 1.00

1.00 1.00
1.00 1.00

3.00 - - 3.00 - - -
FINISHING DINDING FINISHING PLAFON
BORDER KD 30 X 60 TIMBAL PARTISI VYNIL LIST GYP GYP 9MM KALSI
49.21 108.12
12.34 6.50
81.27 23.20 27.09
5.80 16.24 6.70 2.45
81.41 22.90 27.14
5.50 15.40 6.40 2.50
43.55 52.39
10.40 6.70
6.75 2.81
10.88 5.99
119.98 25.70 39.99
68.90 20.24 22.97
13.20 7.62
51.50 81.81
5.50 15.40 6.40 2.50
16.55 16.61
6.50 18.20 7.40 3.17
17.55 18.32
26.75 32.56

23.30 65.24 351.56 - - 377.61 453.80 13.43

7.80 m'
FINISHING DINDING FINISHING PLAFON
BORDER KD 30 X 60 TIMBAL PARTISI VYNIL LIST GYP GYP 9MM KALSI
17.40 16.66
5.00 14.00 5.90 2.16
5.00 14.00 5.90 2.16
72.00 174.35
28.56 27.85
15.55 13.80
15.55 13.80
9.48 9.21
20.05 9.71
7.10 12.78 7.90 3.51
7.00 19.60 7.90 3.51
13.66 10.66
11.18 6.77
6.40 24.98
147.97 152.43
13.20 7.62

24.10 60.38 - - - 398.60 446.35 32.81

14.47 m'
FINISHING DINDING FINISHING PLAFON
BORDER KD 30 X 60 TIMBAL PARTISI VYNIL LIST GYP GYP 9MM KALSI
84.45 28.15 48.59
77.10 25.70 40.03
77.10 25.70 40.03
42.96 51.28
30.40 32.93
25.35 22.29
21.90 28.94
13.60 10.90
6.27 11.29 7.17 3.21
21.81 27.33
16.55 11.23
12.05 7.56
5.00 14.00 5.80 1.94
9.00 5.05
5.92 16.58 6.80 2.47
8.90 4.77
4.80 13.44 5.70 1.89
14.50 7.19
8.55 4.33
12.40 9.55
82.40 53.80
45.10 56.90
13.20 7.62

21.99 55.30 - - 238.65 483.69 470.31 9.51


FINISHING DINDING FINISHING PLAFON
BORDER KD 30 X 60 TIMBAL PARTISI VYNIL LIST GYP GYP 9MM KALSI

- - - - - - - -

LT.1 LT.2 LT.3 LT. ATAP


SPONENG LUAS LATIU SPONENG LUAS LATIU SPONENG LUAS
22.00 - - - - - - -
- - - - - - - -
- - - - 23.80 10.00 73.00 -
- - - - 30.24 14.40 156.00 2.52
- - - - 10.16 4.80 52.80 -
- - - - 3.92 1.70 14.00 -
- - - - 3.18 1.50 13.00 -
- - - - 10.20 - 35.70 -
88.00 10.01 - 88.00 10.01 - 88.00 -
- - - - 4.20 - 57.60 -
118.80 64.75 24.60 148.50 25.90 9.84 59.40 -
22.80 8.12 3.20 22.80 8.12 3.20 22.80 -
- 8.40 3.60 22.40 8.40 3.60 22.40 -
43.00 14.42 5.74 43.00 14.42 5.74 43.00 -
- 10.57 4.07 26.30 10.57 4.07 26.30 -
22.80 1.53 2.94 17.10 2.55 4.90 28.50 -
18.80 2.40 3.80 18.80 1.20 1.90 9.40 -
- 3.00 4.60 22.00 12.00 18.40 88.00 -
- - - - 2.22 3.60 17.92 -
51.10 1.35 2.10 10.22 8.10 12.60 61.32 -

387.30 124.55 54.65 419.12 189.19 100.25 869.14 2.52

BAK CUCI ASESORIES


WASHBAK MEJA HAND GANT AUTO CLAVE
KERAMIK MEJA T TISU T SABUN
STAINLESS BETON RALL HANDUK

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

1.00 1.00 1.00

- - - - 5.00 5.00 5.00 -

BAK CUCI ASESORIES


WASHBAK MEJA HAND GANT AUTO CLAVE
KERAMIK MEJA T TISU T SABUN
AUTO CLAVE
KERAMIK MEJA T TISU T SABUN
STAINLESS BETON RALL HANDUK

1.00 1.00 1.00


1.00 1.00 1.00

1.00 0.06 0.81


2.00 0.06 1.08

1.00 1.00 1.00

3.00 0.13 1.89 0.00 3.00 3.00 3.00 0.00

BAK CUCI ASESORIES


WASHBAK MEJA HAND GANT AUTO CLAVE
KERAMIK MEJA T TISU T SABUN
STAINLESS BETON RALL HANDUK

1.00

1.00 1.00

1.00 1.00
1.00 1.00

- - - - 3.00 - 3.00 1.00


NISHING PLAFON
BE WP

17.24

17.24 -
NISHING PLAFON
BE WP

17.24

17.24 -
NISHING PLAFON
BE WP

17.24

17.24 -
NISHING PLAFON
BE WP
38.62

38.62 -

LT. ATAP
LATIU SPONENG
- -
- -
- -
1.20 13.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -

1.20 13.00

SCRUB SPOOL
PAS BOX
SINK HOEK

- - -

SCRUB SPOOL
PAS BOX
SINK HOEK
SCRUB SPOOL
PAS BOX
SINK HOEK

0.00 0.00 0.00

SCRUB SPOOL
PAS BOX
SINK HOEK

1.00
- 1.00 -