REKAPITULASI
PEKERJAAN : PERENCANAAN PEMBANGUNAN GEDUNG
LOKASI :
TH. ANGGARAN :
A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN Rp 195,975,596.00
II PEKERJAAN PONDASI & PILE CAP Rp 925,140,962.65
III PEKERJAAN TANAH Rp 4,450,443.41
IV PEKERJAAN BETON BERTULANG Rp 2,231,554,287.27
V PEKERJAAN RANGKA BAJA & PENUTUP ATAP Rp 202,046,190.10
B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA Rp 1,874,747,586.08
II PEKERJAAN PLAFOND Rp 100,339,844.39
III PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 464,457,068.79
IV PEKERJAAN PENGECATAN Rp 116,740,307.94
V PEKERJAAN SANITAIR Rp 103,973,403.00
VI PEKERJAAN PENGADAAN RALLING , MEJA COUNTER & WALL PROTE Rp 34,783,000.00
VII PEKERJAAN LAIN - LAIN
JUMLAH Rp 11,519,477,331.12
PPN 10 % Rp 1,151,947,733.11
JUMLAH SETELAH PPN 10% Rp 12,671,425,064.23
DIBULATKAN Rp 12,671,425,000.00
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
A.4.1.2.1 Pembuatan 1 m2 lahan produksi tebal 8cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1320 #REF! #REF!
Tukang batu L.0.02 OH 0.0220 #REF! #REF!
Kepala tukang L.0.03 OH 0.0020 #REF! #REF!
Mandor L.0.04 OH 0.0070 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 26.0800 #REF! #REF!
Pasir beton Kg 60.8000 -
Kerikil (maks 30mm) Kg 82.3200 -
Air L 17.2000 #REF! #REF!
JUMLAH HARGA ALAT #REF!
C PERALATAN
A.4.1.2.2 Pembuatan 1 m2 lahan produksi tebal 10cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1650 #REF! #REF!
Tukang batu L.0.02 OH 0.0280 #REF! #REF!
Kepala tukang L.0.03 OH 0.0030 #REF! #REF!
Mandor L.0.04 OH 0.0080 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 32.6000 #REF! #REF!
Pasir beton Kg 76.0000 -
Kerikil (maks 30mm) Kg 102.9000 -
Air L 21.5000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
2
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.4.1.2.3 Pembuatan 1 m2 lahan produksi tebal 12cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1960 #REF! #REF!
Tukang batu L.0.02 OH 0.0330 #REF! #REF!
Kepala tukang L.0.03 OH 0.0030 #REF! #REF!
Mandor L.0.04 OH 0.0100 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 32.1200 #REF! #REF!
Pasir beton Kg 91.2000 -
Kerikil (maks 30mm) Kg 123.4800 -
Air L 25.8000 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
A.4.1.2.4 Pembuatan 1 m2 lahan produksi tebal 15cm beton f'c 14,5 Mpa (K175) slump (12 ± 2) cm
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.2480 #REF! #REF!
Tukang batu L.0.02 OH 0.0410 #REF! #REF!
Kepala tukang L.0.03 OH 0.0040 #REF! #REF!
Mandor L.0.04 OH 0.0130 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Semen PC Kg 48.9000 #REF! #REF!
Pasir beton Kg 114.0000 -
Kerikil (maks 30mm) Kg 154.3500 -
Air L 32.2500 #REF! #REF!
3
JUMLAH HARGA BAHAN #REF!
C PERALATAN
4
Mandor L.0.04 OH 0.0010 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Kayu kaso 5/7 m3 0.0050 -
Phenol film 12mm Lbr 0.0430 -
Minyak bekisting L 0.2000 #REF! #REF!
Dinabolt dia 12mm (10- 0.6930
Bh -
15cm)
JUMLAH HARGA BAHAN #REF!
C PERALATAN
5
A.4.1.2 8 Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0530 #REF! #REF!
Tukang kayu OH 0.0180 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2 9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0890 #REF! #REF!
Tukang kayu OH 0.0300 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
A.4.1.2 10 Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0710 #REF! #REF!
Tukang kayu OH 0.0240 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!
6
JUMLAH TENAGA KERJA #REF!
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
7
JUMLAH HARGA BAHAN
C PERALATAN
8
C PERALATAN
Sewa crane UH 0.0670 -
Sewa pipe support UH 1.1000 -
JUMLAH HARGA ALAT -
9
Kepala Tukang L.0.03 OH 0.0830 #REF! #REF!
Mandor L.0.04 OH 0.0830 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 8.2770 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Sewa crane UH 0.0830 -
Sewa pipe support UH 2.2000 -
JUMLAH HARGA ALAT -
10
Pembantu operator crane OH 0.0190 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Solar L 1.8970 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
Sewa crane UH 0.0190 -
JUMLAH HARGA ALAT -
11
JUMLAH HARGA BAHAN #REF!
C PERALATAN
12
A.4.1.2 23 Pemasangan 1 titik Bekisting join pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja 0.1470 #REF! #REF!
Tukang kayu L.0.02 OH 0.1470 #REF! #REF!
Kepala tukang L.0.03 OH 0.0150 #REF! #REF!
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Kayu kaso 5/7 m3 0.0120 -
Papan cor m3 0.0040 -
Paku 5-7cm Kg 0.2640 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
C PERALATAN
13
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA
A.8.4.1.1 Pemasangan 1 m pipa PVC Ø 63 mm
Harga Sat uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0810 #REF! #REF!
Tukang pipa L.0.02 OH 0.0410 -
Mandor L.0.04 OH 0.0080 #REF! #REF!
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.2940 #REF! #REF!
Tukang pipa L.0.02 OH 0.1470 -
Mandor L.0.04 OH 0.0290 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.0400 -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 0.6690 #REF! #REF!
Tukang pipa L.0.02 OH 0.3350 -
Mandor L.0.04 OH 0.0670 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.1000 -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.6180 #REF! #REF!
Tukang pipa L.0.02 OH 0.8090 -
Mandor L.0.04 OH 0.1620 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.2500 -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 1.6910 #REF! #REF!
Tukang pipa L.0.02 OH 0.8460 -
Mandor L.0.04 OH 0.1690 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.2620 -
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 2.3030 #REF! #REF!
Tukang pipa L.0.02 OH 1.1520 -
Mandor L.0.04 OH 0.2300 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3590 -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.0450 #REF! #REF!
Tukang pipa L.0.02 OH 0.0230 -
Mandor L.0.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0190 -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.1330 #REF! #REF!
Tukang pipa L.0.02 OH 0.0670 -
Mandor L.0.04 OH 0.0130 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0420 -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 0.5120 #REF! #REF!
Tukang pipa L.0.02 OH 0.2560 -
Mandor L.0.04 OH 0.0510 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 500 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.3070 -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 1.3530 #REF! #REF!
Tukang pipa L.0.02 OH 0.6770 -
Mandor L.0.04 OH 0.1350 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 900 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.8830 -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.6590 #REF! #REF!
Tukang pipa L.0.02 OH 0.8300 -
Mandor L.0.04 OH 0.1660 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 1.0930 -
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 0.4480 #REF! #REF!
Tukang pipa L.0.02 OH 0.2240 -
Mandor L.0.04 OH 0.0450 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 125 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.5060 #REF! #REF!
Tukang pipa L.0.02 OH 0.2530 -
Mandor L.0.04 OH 0.0510 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 150 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 0.7960 #REF! #REF!
Tukang pipa L.0.02 OH 0.3980 -
Mandor L.0.04 OH 0.0800 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 1.3530 #REF! #REF!
Tukang pipa L.0.02 OH 0.6760 -
Mandor L.0.04 OH 0.1350 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 450 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 2.9110 #REF! #REF!
Tukang pipa L.0.02 OH 1.4560 -
Mandor L.0.04 OH 0.2910 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1000 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 3.4880 #REF! #REF!
Tukang pipa L.0.02 OH 1.7440 -
Mandor L.0.04 OH 0.3490 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa GIP Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.4890 #REF! #REF!
Tukang pipa L.0.02 OH 0.0980 -
Mandor L.0.04 OH 0.0490 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.3800 -
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.8550 #REF! #REF!
Tukang pipa L.0.02 OH 0.1710 -
Mandor L.0.04 OH 0.0850 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 200 mm M 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle hari 0.3800 -
crane 2 T
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.0.01 OH 0.9730 #REF! #REF!
Tukang pipa L.0.02 OH 0.1950 -
Mandor L.0.04 OH 0.0970 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 300 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0710 -
crane 2 T
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 3.8590 #REF! #REF!
Tukang pipa L.0.02 OH 0.7720 -
Operator alat berat L.0.08 OH 0.4930 -
Mandor L.0.04 OH 0.3860 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 800 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
hari 0.0840 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
hari 0.2250 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 6.9490 #REF! #REF!
Tukang pipa L.0.02 OH 1.3900 -
Operator alat berat L.0.08 OH 0.7930 -
Mandor L.0.04 OH 0.6950 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1100 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225
kap 0,5 -1,0 m3 hari 0.1520 -
A TENAGA
Pekerja L.0.01 OH 8.0560 #REF! #REF!
Tukang pipa L.0.02 OH 1.6110 -
Operator alat berat L.0.08 OH 0.8930 -
Mandor L.0.04 OH 0.8060 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa DCI Ø 1200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225 hari 0.1800 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
crane 2 T hari 0.3600 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 0.4990 #REF! #REF!
Tukang pipa L.0.02 OH 0.1000 -
Mandor L.0.04 OH 0.0500 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 63 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
crane 2 T hari 0.0040 -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A TENAGA
Pekerja L.0.01 OH 1.1130 #REF! #REF!
Tukang pipa L.0.02 OH 0.2230 -
Mandor L.0.04 OH 0.1110 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 200 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0040 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A TENAGA
Pekerja L.0.01 OH 1.3250 #REF! #REF!
Tukang pipa L.0.02 OH 0.2650 -
Mandor L.0.04 OH 0.1330 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 250 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0040 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
No Uraian Kode Satuan Koefisien Harga Sat uan Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.0.01 OH 2.3660 #REF! #REF!
Tukang pipa L.0.02 OH 0.4730 -
Mandor L.0.04 OH 0.2370 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 400 mm m 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Sewa excavat or t ype 225 hari 0.0270 -
kap 0,5 -1,0 m3
Sewa Tripot/Tackel & handle
hari 0.0390 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Prof it 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 18/172
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 110 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0030 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -
Hal 19/172
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 20/172
B BAHAN
Pipa PVC Ø 400 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0860 -
T1/manual (gergaji) /saw
JUMLAH HARGA ALAT -
Hal 21/172
A.8.4.2.11 Pemotongan 1 buah pipa PVC Ø 600 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.6230 #REF! #REF!
Tukang pipa L.0.02 OH 0.3110 -
Mandor L.0.04 OH 0.0620 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0860 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 22/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1680 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 23/172
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.5730 #REF! #REF!
Tukang pipa L.0.02 OH 0.7870 -
Mandor L.0.04 OH 0.1570 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa PVC Ø 1200 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.2360 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 24/172
B BAHAN
Pipa HDPE Ø 100 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0050 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 25/172
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 26/172
A TENAGA
Pekerja L.0.01 OH 0.0900 #REF! #REF!
Tukang pipa L.0.02 OH 0.0450 -
Mandor L.0.04 OH 0.0090 #REF! #REF!
Operator L.0.08 OH 0.2710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 300 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0300 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 27/172
Pipa HDPE Ø 450 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0700 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 28/172
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 29/172
Pekerja L.0.01 OH 1.1250 #REF! #REF!
Tukang pipa L.0.02 OH 0.5620 -
Mandor L.0.04 OH 0.1120 #REF! #REF!
Operator L.0.08 OH 0.9710 -
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa HDPE Ø 1000 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.3320 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 30/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.4770 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 31/172
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 32/172
Pekerja L.0.01 OH 0.3400 #REF! #REF!
Tukang pipa L.0.02 OH 0.1700 -
Mandor L.0.04 OH 0.0340 #REF! #REF!
Hal 33/172
C PERALATAN
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 34/172
A.8.4.2.42 Pemotongan 1 buah pipa GIP Ø 500 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.9410 #REF! #REF!
Tukang pipa L.0.02 OH 0.4710 -
Mandor L.0.04 OH 0.0940 #REF! #REF!
Hal 35/172
Tukang pipa L.0.02 OH 0.7830 -
Mandor L.0.04 OH 0.1570 #REF! #REF!
Hal 36/172
Peralatan potong pipa
hari -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 37/172
A.8.4.2.49 Pemotongan 1 buah pipa DCI Ø 100 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0710 #REF! #REF!
Tukang pipa L.0.02 OH 0.0140 -
Mandor L.0.04 OH 0.0070 #REF! #REF!
Hal 38/172
Tukang pipa L.0.02 OH 0.0320 -
Mandor L.0.04 OH 0.0160 #REF! #REF!
Hal 39/172
C PERALATAN
Sewa Tripot/Tackel & handle
hari 0.0730 -
crane 2 T
JUMLAH HARGA ALAT -
Hal 40/172
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 41/172
Pekerja L.0.01 OH 1.3090 #REF! #REF!
Tukang pipa L.0.02 OH 0.2620 -
Mandor L.0.04 OH 0.1310 #REF! #REF!
Hal 42/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.3810 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 43/172
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 44/172
A TENAGA
Pekerja L.0.01 OH 0.0850 #REF! #REF!
Tukang pipa L.0.02 OH 0.0170 -
Mandor L.0.04 OH 0.0080 #REF! #REF!
Hal 45/172
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.0450 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 46/172
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 47/172
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 1.3990 #REF! #REF!
Tukang pipa L.0.02 OH 0.2800 -
Mandor L.0.04 OH 0.1400 #REF! #REF!
Hal 48/172
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Baja Ø 600 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 0.1130 -
T2/mekanik / cilinder saw
JUMLAH HARGA ALAT -
Hal 49/172
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
Hal 50/172
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 4.0150 #REF! #REF!
Tukang pipa L.0.02 OH 0.8030 -
Mandor L.0.04 OH 0.4020 #REF! #REF!
Hal 51/172
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
A.8.4.3.1 Pemasangan 1 buah Valve Ø 150 mm
Harga S at uan
No Uraian Kode Satuan Koefisien (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja L.0.01 OH 1.4290 #REF! #REF!
Tukang pipa L.0.02 OH 0.7150 -
Mandor L.0.04 OH 0.1430 #REF! #REF!
A TENAGA
Pekerja L.0.01 OH 3.4290 #REF! #REF!
Tukang pipa L.0.02 OH 1.7150 -
Mandor L.0.04 OH 0.3430 #REF! #REF!
A TENAGA
Pekerja L.0.01 OH 0.2160 #REF! #REF!
Tukang pipa L.0.02 OH 0.1080 -
Mandor L.0.04 OH 0.0220 #REF! #REF!
A TENAGA
Pekerja L.0.01 OH 1.7560 #REF! #REF!
Tukang pipa L.0.02 OH 0.8780 -
Mandor L.0.04 OH 0.1760 #REF! #REF!
A.8.4.4.12 Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 7.9460 #REF! #REF!
Tukang pipa L.0.02 OH 3.9730 -
Mandor L.0.04 OH 0.7950 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Pipa Ø 800 mm bh 1.0000 -
JUMLAH HARGA BAHAN -
C PERALATAN
Peralatan potong pipa
hari 2.1900 -
T2/mekanik / cilinder saw
Sewa Genset 1500 watt hari 3.0990 -
Sewa Pompa Submersible
hari 4.9280 -
3m 3 /hTripot/Tackel & handle
Sewa
hari 2.5210 -
crane 2 T
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) #REF!
E Overhead & Profit 10% x D 10% #REF!
F Harga Satuan Pekerjaan (D+E) #REF!
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA
A.8.4.5.1 Pengetesan 1 m pipa Ø 50 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.0.01 OH 0.0080 #REF! #REF!
Mandor L.0.04 OH 0.0008 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
B BAHAN
Air test (air bersih) m3 0.0020 -
Bahan bakar liter 0.0600 #REF! #REF!
Oli liter 0.0020 #REF! #REF!
REKAPITULASI
JUMLAH Rp 5,265,268,641.49
RENCANA ANGGARAN BIAYA ( RAB )
2 - Kapasitor Bank
* Capasitor Bank Easy Can 12,5 kVAR 8.00 bh Taksir 1,734,000.00 13,872,000.00
* Power Factor Regulator 8 Step 1.00 bh Taksir 4,614,000.00 4,614,000.00
* Contactor 40 A (Khusus Capasitor Bank) 8.00 bh Taksir 1,192,000.00 9,536,000.00
* Manual Push Button ON-OFF 16.00 bh Taksir 99,150.00 1,586,400.00
* MCCB 40 A / 10 KA, 3P 8.00 bh Taksir 638,000.00 5,104,000.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* Cos phi meter 1.00 bh Taksir 400,000.00 400,000.00
* CT 200/5 A 3.00 bh Taksir 339,000.00 1,017,000.00
* Kabel NYY 4 x 1 x 70 mm2 dari MDP 5.00 m' Taksir 363,384.00 1,816,920.00
3 - SDP Penerangan (Lantai 01)
* Panel 80 x 120 x 30 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 17,280,000.00 17,280,000.00
* MCCB 25 A / 10 KA, 3P 2.00 bh Taksir 638,000.00 1,276,000.00
* MCCB 40 A / 10 KA, 3P 6.00 bh Taksir 638,000.00 3,828,000.00
* MCCB 80 A / 10 KA, 3P 1.00 bh Taksir 705,650.00 705,650.00
* MCCB 200 A / 25 KA, 3P 1.00 bh Taksir 1,908,500.00 1,908,500.00
* Pilot lamp 3.00 bh Taksir 55,450.00 166,350.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00 150,000.00
* Volt meter 1.00 bh Taksir 452,100.00 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00 1,471,800.00
* CT 200/5 A 3.00 bh Taksir 339,000.00 1,017,000.00
* Surge Arrester PF40, 3P + N 1.00 bh Taksir 1,580,700.00 1,580,700.00
* Arde BCC 35 mm2 max. 2 ohm 15.00 m' Taksir 39,069.60 586,044.00
* Kabel NYY 4 x 1 x 70 mm2 dari MDP 15.00 m' Taksir 363,384.00 5,450,760.00
2 PEKERJAAN PANEL AC
PANEL AIR CONDITIONING LANTAI 1 (PAC-LT.01)
* Panel 60 x 80 x 20 + busbar, pengkabelan, aksesoris ( Terpasang ) 1.00 unit Taksir 5,760,000.00
* MCB 16 A / 6 KA, 1P 14.00 bh Taksir 94,600.00
* MCB 25 A / 6 KA, 3P 4.00 bh Taksir 445,500.00
* MCCB 60 A / 10 KA, 3P 1.00 bh Taksir 862,950.00
* Pilot lamp 3.00 bh Taksir 55,450.00
* Selector Switch Voltage 1.00 bh Taksir 507,400.00
* Fuse 6A + holder 3.00 bh Taksir 50,000.00
* Volt meter 1.00 bh Taksir 452,100.00
* Ampere meter 3.00 bh Taksir 490,600.00
* CT 100/5 A 3.00 bh Taksir 324,500.00
* Arde BCC 16 mm2 max. 2 ohm 15.00 m' Taksir 18,280.80
* Kabel NYY 4 x 16 mm2 dari SDP AC 15.00 m' Taksir 92,718.00
IV PEKERJAAN PENERANGAN
1 LANTAI 1
PPS-LT.01
a Instalasi Penerangan
- Lampu RM TL LED 2x10W 31.00 Buah Taksir 637,400.00
- Lampu RM TL LED 3x10W 4.00 Buah Taksir 921,100.00
- Lampu Dowlight Inbow LED Bulb 12W 11.00 Buah Taksir 230,000.00
- Lampu Rosset LED Bulb 12W 8.00 Buah Taksir 85,000.00
- Exhaust Fan 50 W 5.00 Buah Taksir 800,000.00
b Titik instalasi Penerangan 59.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 40.00 Buah Taksir 60,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 40.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Pekerjaan Saklar
- Saklar Tunggal 11.00 Buah Taksir 49,764.00
- Saklar Ganda 13.00 Buah Taksir 80,652.00
- Saklar Tukar 2.00 Buah Taksir 100,000.00
2 LANTAI 2
PPS-LT.02
a Instalasi Penerangan
- Lampu RM TL LED 2x10W 4.00 Buah Taksir 637,400.00
- Lampu RM TL LED 3x10W 4.00 Buah Taksir 921,100.00
- Lampu RM TL LED 2x10W w/ cover 4.00 Buah Taksir 737,400.00
- Lampu RM TL LED 3x10W w/ cover 18.00 Buah Taksir 1,021,100.00
- Lampu Dowlight Inbow LED Bulb 12W 27.00 Buah Taksir 230,000.00
- Lampu Rosset LED Bulb 12W 7.00 Buah Taksir 85,000.00
- Exhaust Fan 50 W 5.00 Buah Taksir 800,000.00
b Titik instalasi Penerangan 69.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 27.00 Buah Taksir 60,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 27.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Pekerjaan Saklar
- Saklar Tunggal 8.00 Buah Taksir 49,764.00
- Saklar Ganda 14.00 Buah Taksir 80,652.00
- Saklar Tukar 2.00 Buah Taksir 100,000.00
PS.ICU-LT.02
a Instalasi Stop Kontak
- Stop Kontak daya 200 W 120.00 Buah Taksir 60,000.00
b Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 120.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
3 LANTAI 3
PPS-LT.03
a Instalasi Penerangan
- Lampu Clean Room LED 55W c/w PSU 11.00 Buah Taksir 3,465,000.00 38,115,000.00
- Lampu RM TL LED 2x10W 3.00 Buah Taksir 637,400.00 1,912,200.00
- Lampu RM TL LED 3x10W 2.00 Buah Taksir 921,100.00 1,842,200.00
- Lampu Dowlight Inbow LED Bulb 12W 27.00 Buah Taksir 230,000.00 6,210,000.00
- Lampu Rosset LED Bulb 12W 9.00 Buah Taksir 85,000.00 765,000.00
- Exhaust Fan 50 W 5.00 Buah Taksir 800,000.00 4,000,000.00
b Titik instalasi Penerangan 57.00 Titik Taksir 250,000.00 14,250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 41.00 Buah Taksir 60,000.00 2,460,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 41.00 Titik Taksir 250,000.00 10,250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Pekerjaan Saklar
- Saklar Tunggal 15.00 Buah Taksir 49,764.00 746,460.00
- Saklar Ganda 11.00 Buah Taksir 80,652.00 887,172.00
- Saklar Tukar 2.00 Buah Taksir 100,000.00 200,000.00
PPS.OK1-LT.03
a Instalasi Penerangan
- Lampu Operasi 500W 1.00 Buah Taksir by owner
- Lampu Clean Room LED 55W c/w PSU 12.00 Buah Taksir include sandwich panel
- Lampu Tanda Operasi 5W 1.00 Buah Taksir 125,000.00 125,000.00
b Titik instalasi Penerangan 14.00 Titik Taksir 250,000.00 3,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 10.00 Buah Taksir 60,000.00 600,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 10.00 Titik Taksir 250,000.00 2,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Pekerjaan Saklar
- Saklar Ganda 2.00 Buah Taksir 80,652.00 161,304.00
PPS.OK2-LT.03
a Instalasi Penerangan
- Lampu Operasi 500W 1.00 Buah Taksir by owner
- Lampu Clean Room LED 55W c/w PSU 12.00 Buah Taksir include sandwich panel
- Lampu Tanda Operasi 5W 1.00 Buah Taksir 125,000.00 125,000.00
b Titik instalasi Penerangan 14.00 Titik Taksir 250,000.00 3,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 10.00 Buah Taksir 60,000.00 600,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 10.00 Titik Taksir 250,000.00 2,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Pekerjaan Saklar
- Saklar Ganda 2.00 Buah Taksir 80,652.00 161,304.00
PPS.OK3-LT.03
a Instalasi Penerangan
- Lampu Operasi 500W 1.00 Buah Taksir by owner
- Lampu Clean Room LED 55W c/w PSU 12.00 Buah Taksir include sandwich panel
- Lampu Tanda Operasi 5W 1.00 Buah Taksir 125,000.00 125,000.00
b Titik instalasi Penerangan 14.00 Titik Taksir 250,000.00 3,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
c Instalasi Stop Kontak
- Stop Kontak daya 200 W 10.00 Buah Taksir 60,000.00 600,000.00
d Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 10.00 Titik Taksir 250,000.00 2,500,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Pekerjaan Saklar
- Saklar Ganda 2.00 Buah Taksir 80,652.00 161,304.00
AHU 2 (OK 2)
- Kapasitas : 114.000 BTU/h, (termasuk Supply Fan, 3200 cfm, ESP 750 Pa, 1.00 unit Taksir 314,000,000.00 314,000,000.00
Electric Heater, Pre Filter, Medium Filter, Hepa Filter, Pre Cooling,
dan Auto Restart Thermostat Control Panel) dan outdoor unit
1 Pemasangan Dudukan Outdoor, Indoor & Ongkos Pasang 1.00 ttk Taksir 17,500,000.00 17,500,000.00
a Instalasi Ducting Supply Air lengkap dengan Isolasi Plenum Return Duct,
lengkap penggantung
18" X 20" 8.20 m Taksir 760,000.00 6,232,000.00
12" X 16" 4.00 m Taksir 560,000.00 2,240,000.00
10" X 14" 8.80 m Taksir 480,000.00 4,224,000.00
16" X 18" 11.10 m Taksir 680,000.00 7,548,000.00
10" X 16" 3.70 m Taksir 520,000.00 1,924,000.00
10" X 10" 12.00 m Taksir 400,000.00 4,800,000.00
b Pekerjaan Diffuser & Grille ( Bahan Perforated )
- SAD 24" x 40" Rainforced 4.00 bh Taksir 1,920,000.00 7,680,000.00
- FAG 12" X 18" Linear 1.00 bh Taksir 900,000.00 900,000.00
- RAG 16" x 24" 4.00 bh Taksir 1,200,000.00 4,800,000.00
- Volume Dumper 7.00 bh Taksir 400,000.00 2,800,000.00
- Magnehelic 40 Pa 1.00 bh Taksir 7,500,000.00 7,500,000.00
- Electric Control RH 1.00 bh Taksir 20,000,000.00 20,000,000.00
- Exhaust Fan Low noise, 1250 cfm, Pressure Static 280 Pa 1.00 bh Taksir 3,248,437.50 3,248,437.50
2 Material Bantu & Testing Commissioning 1.00 lot Taksir 12,161,893.13 12,161,893.13
AHU 3 (OK 3)
- Kapasitas : 114.000 BTU/h, (termasuk Supply Fan, 3200 cfm, ESP 750 Pa, 1.00 unit Taksir 314,000,000.00 314,000,000.00
Electric Heater, Pre Filter, Medium Filter, Hepa Filter, Pre Cooling,
dan Auto Restart Thermostat Control Panel) dan outdoor unit
1 Pemasangan Dudukan Outdoor, Indoor & Ongkos Pasang 1.00 ttk Taksir 17,500,000.00 17,500,000.00
a Instalasi Ducting Supply Air lengkap dengan Isolasi Plenum Return Duct,
lengkap penggantung
18" X 20" 8.20 m Taksir 760,000.00 6,232,000.00
12" X 16" 4.00 m Taksir 560,000.00 2,240,000.00
10" X 14" 8.80 m Taksir 480,000.00 4,224,000.00
16" X 18" 11.10 m Taksir 680,000.00 7,548,000.00
10" X 16" 3.70 m Taksir 520,000.00 1,924,000.00
10" X 10" 12.00 m Taksir 400,000.00 4,800,000.00
b Pekerjaan Diffuser & Grille ( Bahan Perforated )
- SAD 24" x 40" Rainforced 4.00 bh Taksir 1,920,000.00 7,680,000.00
- FAG 12" X 18" Linear 1.00 bh Taksir 900,000.00 900,000.00
- RAG 16" x 24" 4.00 bh Taksir 1,200,000.00 4,800,000.00
- Volume Dumper 7.00 bh Taksir 400,000.00 2,800,000.00
- Magnehelic 40 Pa 1.00 bh Taksir 7,500,000.00 7,500,000.00
- Electric Control RH 1.00 bh Taksir 20,000,000.00 20,000,000.00
- Exhaust Fan Low noise, 1250 cfm, Pressure Static 280 Pa 1.00 bh Taksir 3,248,437.50 3,248,437.50
2 Material Bantu & Testing Commissioning 1.00 lot Taksir 12,161,893.13 12,161,893.13
LANTAI 2
1 Pipa PVC Class AW Dia. 4" 16.00 m' A.5.1.1.32 127,180.63
2 Fitting dan Accessories 1.00 Ls Taksir -
LANTAI 3
1 Pipa PVC Class AW Dia. 4" 19.00 m' A.5.1.1.32 127,180.63 2,416,431.88
2 Fitting dan Accessories 1.00 Ls Taksir 241,643.19 241,643.19
Sub Jumlah 1,841,988,606.94
VI PEKERJAAN PLUMBING
I PEKERJAAN AIR BERSIH
1 Pompa Transfer 1.00 Set Taksir 65,000,000.00 65,000,000.00
Tipe : Vertical Multistage Centrifugal
Kapasitas : debit 10 m3/jam, daya 2 x 5,5 KW
Head : 40 meter
Panel kontrol, pemipaan, fitting, lengkap : valve, WLC, pengkabelan
2 Pipa Pengisi PPR-PN 16 Dia. 2" dari GWT ke Roof Tank 130.00 m' A.5.1.1.29.c 202,471.50 26,321,295.00
LANTAI 1
1 Gate Valve Dia 1 1/2" 1.00 buah Taksir 150,000.00
2 Pipa PPR_PN10 Dia 2" 15.00 m' A.5.1.1.29.a 138,534.00
3 Pipa PPR_PN10 Dia 1 1/2" 15.00 m' A.5.1.1.28.a 89,941.50
4 Pipa PPR_PN10 Dia 1" 11.00 m' A.5.1.1.27.a 40,779.75
5 Pipa PPR_PN10 Dia 1/2" 45.00 m' A.5.1.1.25.a 22,237.88
6 Fitting dan Accessories 1.00 ls Taksir - -
LANTAI 2
1 Gate Valve Dia 1 1/2" 1.00 buah Taksir 150,000.00
2 Pipa PPR_PN10 Dia 2" 10.00 m' A.5.1.1.29.a 138,534.00
3 Pipa PPR_PN10 Dia 1" 3.00 m' A.5.1.1.27.a 40,779.75
4 Pipa PPR_PN10 Dia 3/4" 47.00 m' A.5.1.1.26.a 27,992.25
5 Pipa PPR_PN10 Dia 1/2" 30.00 m' A.5.1.1.25.a 22,237.88
6 Fitting dan Accessories 1.00 ls Taksir - -
LANTAI 3
1 Gate Valve Dia 1 1/2" 1.00 buah Taksir 150,000.00 150,000.00
2 Pipa PPR_PN10 Dia 2" 5.00 m' A.5.1.1.29.a 138,534.00 692,670.00
3 Pipa PPR_PN10 Dia 1" 6.00 m' A.5.1.1.27.a 40,779.75 244,678.50
4 Pipa PPR_PN10 Dia 3/4" 33.00 m' A.5.1.1.26.a 27,992.25 923,744.25
5 Pipa PPR_PN10 Dia 1/2" 24.00 m' A.5.1.1.25.a 22,237.88 533,709.00
6 Fitting dan Accessories 1.00 ls Taksir 718,440.53 718,440.53
LANTAI ATAP
1 Roof Tank Kapasitas 4 m3 1.00 unit Taksir 8,000,000.00 8,000,000.00
Bahan Fiber Glass Anti Lumut
2 Header Pipa GIP Dia. 6" 5.00 m' Taksir 600,000.00 3,000,000.00
3 Header Pipa GIP Dia. 4" 5.00 m' Taksir 400,000.00 2,000,000.00
4 Booster pump package 1.00 Unit Taksir 148,000,000.00 148,000,000.00
Tipe : Vertical Multistage Centrifugal
Kapasitas : debit 4 m3/jam, daya 2 x 2,2 KW
Head : 20 meter
Panel kontrol, pemipaan, fitting, dan aksesoris lengkap : pengkabelan
Valve, Pressure Tank, Pressure Switch, Pressure Gauge, Booster Skid
5 Gate valve Dia. 2 1/2" 6.00 bh Taksir 1,782,000.00 10,692,000.00
6 Gate valve Dia. 2" 1.00 bh Taksir 891,000.00 891,000.00
7 Pipa Drain ( Pipa Kuras ) Roof Tank PVC AW Dia. 2 1/2" 30.00 m' A.5.1.1.29 47,529.63 1,425,888.75
8 Pipa Ring Distribusi PPR_PN10 Dia 2 1/2" 20.00 m' A.5.1.1.30.a 206,734.00 4,134,680.00
9 Fitting dan Accessories 1.00 ls Taksir 1,112,113.75 1,112,113.75
LANTAI 02
1 Pipa PVC Class AW Dia. 6" 10.00 m A.5.1.1.32. a 269,249.75
2 Pipa PVC Class AW Dia. 4" 27.30 m A.5.1.1.32. 127,180.63
3 Pipa PVC Class AW Dia. 3" 39.70 m A.5.1.1.31. 88,454.58
4 Pipa PVC Class AW Dia. 2" 13.00 m A.5.1.1.29. 47,529.63
5 Fitting dan Accessories 1.00 ls Taksir -
6 Clean Out Dia. 4" 2.00 buah Taksir 200,000.00
7 Clean Out Dia. 3" 3.00 buah Taksir 185,000.00
LANTAI 03
1 Pipa PVC Class AW Dia. 6" 5.00 m A.5.1.1.32. a 269,249.75 1,346,248.75
2 Pipa PVC Class AW Dia. 4" 15.50 m A.5.1.1.32. 127,180.63 1,971,299.69
3 Pipa PVC Class AW Dia. 3" 37.90 m A.5.1.1.31. 88,454.58 3,352,428.39
4 Pipa PVC Class AW Dia. 2" 25.00 m A.5.1.1.29. 47,529.63 1,188,240.63
5 Fitting dan Accessories 1.00 ls Taksir 1,571,643.49 1,571,643.49
6 Clean Out Dia. 4" 1.00 buah Taksir 200,000.00 200,000.00
7 Clean Out Dia. 3" 2.00 buah Taksir 185,000.00 370,000.00
PEKERJAAN LAN
1 Instalasi kabel UTP Cat 6 dari Hub ke outlet data dan Wifi c/w RJ45
- Lantai 1 13.00 titik Taksir 250,000.00
- Lantai 2 9.00 titik Taksir 250,000.00
- Lantai 3 5.00 titik Taksir 250,000.00 1,250,000.00
2 Kabel feeder induk UTP Cat 6 dari :
- LT 1 ke Main Switch Hub 10.00 m Taksir 45,000.00
- LT 2 ke Main Switch Hub 15.00 m Taksir 45,000.00
- LT 3 ke Main Switch Hub 20.00 m Taksir 45,000.00 900,000.00
3 Setting,Testing & Commisioning
- Lantai 1 1.00 ls Taksir 1,500,000.00
- Lantai 2 1.00 ls Taksir 1,500,000.00
- Lantai 3 1.00 ls Taksir 1,500,000.00 1,500,000.00
4 Data Outlet 21.00 bh Taksir 150,000.00 3,150,000.00
5 Wifi Acces Point Unifi AC LR 6.00 bh Taksir 2,350,000.00 14,100,000.00
6 Switch Hub 16 port 4.00 bh Taksir 750,000.00 3,000,000.00
7 Instalasi Stop Kontak
- Stop Kontak daya 200 W 4.00 Buah Taksir 60,000.00 240,000.00
8 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 4.00 Titik Taksir 250,000.00 1,000,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Sub Jumlah 41,678,000.00
2 CCTV LANTAI 1
1 IP Camera fixed type indoor, PoE, variable focal lens 2.8-6.0mm, 3.00 bh Taksir 2,200,000.00
c/w camera bracket
2 IP Camera fixed type outdoor, PoE, variable focal lens 2.8-6.0mm, 2.00 bh Taksir 2,915,000.00
c/w camera bracket
3 Switch Hub POE 8 Port 1.00 bh Taksir 1,300,000.00
4 Instalasi Cable UTP. Cat 6 128.00 m Taksir 25,000.00
5 Instalasi Stop Kontak
- Stop Kontak daya 200 W 1.00 Buah Taksir 60,000.00
6 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 1.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
3 CCTV LANTAI 2
1 IP Camera fixed type indoor, PoE, variable focal lens 2.8-6.0mm, 5.00 bh Taksir 2,200,000.00
c/w camera bracket
2 Switch Hub POE 8 Port 1.00 bh Taksir 1,300,000.00
3 Instalasi Cable UTP. Cat 6 111.00 m Taksir 25,000.00
4 Instalasi Stop Kontak
- Stop Kontak daya 200 W 1.00 Buah Taksir 60,000.00
5 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 1.00 Titik Taksir 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
4 CCTV LANTAI 3
1 IP Camera fixed type indoor, PoE, variable focal lens 2.8-6.0mm, 3.00 bh Taksir 2,200,000.00 6,600,000.00
c/w camera bracket
2 Switch Hub POE 8 Port 1.00 bh Taksir 1,300,000.00 1,300,000.00
3 Instalasi Cable UTP. Cat 6 33.00 m Taksir 25,000.00 825,000.00
4 Instalasi Stop Kontak
- Stop Kontak daya 200 W 1.00 Buah Taksir 60,000.00 60,000.00
5 Titik instalasi Stop Kontak daya 10 A, 1 ph, umum 1.00 Titik Taksir 250,000.00 250,000.00
NYM 3 x 2.5 mm2 termasuk pipa conduit
Sub Jumlah 43,885,950.00
PEKERJAAN INSTALASI
1 Instalasi Lantai 1
- Terminal Box ( TB - FA.BS ) 1.00 Unit Taksir 750,000.00
- Smoke Detector 5.00 Buah Taksir 300,000.00
- ROR Heat Detector 14.00 Buah Taksir 120,000.00
- Alarm Bell 1.00 Buah Taksir 300,000.00
- Indicator lamp 1.00 Buah Taksir 100,000.00
- Manual push button 1.00 Buah Taksir 2,000,000.00
- End of line resistor 3.00 Buah Taksir 20,000.00
- Instalasi Detector dan Alarm NYA 2 x 1,5 mm2 dalam conduit 20mm 22.00 Titik Taksir 300,000.00
2 Instalasi Lantai 2
- Terminal Box ( TB - FA.BS ) 1.00 Unit Taksir 750,000.00
- ROR Heat Detector 23.00 Buah Taksir 120,000.00
- Alarm Bell 1.00 Buah Taksir 300,000.00
- Indicator lamp 1.00 Buah Taksir 100,000.00
- Manual push button 1.00 Buah Taksir 2,000,000.00
- End of line resistor 2.00 Buah Taksir 20,000.00
- Instalasi Detector dan Alarm NYA 2 x 1,5 mm2 dalam conduit 20mm 26.00 Titik Taksir 300,000.00
3 Instalasi Lantai 3
- Terminal Box ( TB - FA.BS ) 1.00 Unit Taksir 750,000.00 750,000.00
- ROR Heat Detector 27.00 Buah Taksir 120,000.00 3,240,000.00
- Alarm Bell 1.00 Buah Taksir 300,000.00 300,000.00
- Indicator lamp 1.00 Buah Taksir 100,000.00 100,000.00
- Manual push button 1.00 Buah Taksir 2,000,000.00 2,000,000.00
- End of line resistor 2.00 Buah Taksir 20,000.00 40,000.00
- Instalasi Detector dan Alarm NYA 2 x 1,5 mm2 dalam conduit 20mm 30.00 Titik Taksir 300,000.00 9,000,000.00
XI PEKERJAAN LIFT
Penyediaan dan pemasangan Lift Hospital lengkap
dengan aksessories, ARD dan semua material bantu
yang diperlukan sesuai dengan spesifikasi teknik
dan petunjuk pabrik seperti pada gambar
Digital Electronic Control, ACVVVF-
Vector Inverter Control Digital - Sicon Zuci 4000
Traction Machine Worm Gear Box
Traction Machine , termasuk pelatihan, perijinan, buku petunjuk operasional,
Testing, Cvommissioning
1 Pengadaan Lift
Penggunaan : Lift hospital & fire Service 1.00 Unit Taksir 450,000,000.00 450,000,000.00
Kapasitas : 1.600 Kg / 24 Orang
Speed : 60 MPM
Power Control : AC Variable Voltage Variable Frequency
No. of Stop / Service : 3 Stop / 3 Lantai
2 Biaya Pemasangan & Instalasi 1.00 Ls Taksir 30,000,000.00 30,000,000.00
Sub Jumlah 480,000,000.00
Nitrous Oxide ( N )
Copper Tube dia 1/2" (termasuk pipa tegak Shaft) 65.00 m' Taksir 115,000.00 7,475,000.00
Compressed Air ( A )
Copper Tube dia 5/8" (termasuk pipa tegak Shaft) 65.00 m' Taksir 146,000.00 9,490,000.00
Vaccum ( V )
Copper Tube dia 7/8" (termasuk pipa tegak Shaft) 65.00 m' Taksir 255,000.00 16,575,000.00
e Pipa Instalasi
Lantai 2
Oxygen ( O )
Copper Tube dia 3/4" 48.20 m Taksir 173,000.00
Copper Tube dia 1/2" 38.80 m Taksir 115,000.00
Copper Tube dia 3/8" 72.00 m Taksir 82,000.00
Compressed Air ( A )
Copper Tube dia 3/4" 48.20 m Taksir 173,000.00
Copper Tube dia 1/2" 38.80 m Taksir 115,000.00
Copper Tube dia 3/8" 36.00 m Taksir 82,000.00
Vacuum ( V )
Copper Tube dia 7/8" 48.20 m Taksir 255,000.00
Copper Tube dia 5/8" 38.80 m Taksir 146,000.00
Copper Tube dia 1/2" 36.00 m Taksir 115,000.00
Lantai 3
Oxygen ( O )
Copper Tube dia 5/8" 18.30 m Taksir 146,000.00 2,671,800.00
Copper Tube dia 1/2" 64.30 m Taksir 115,000.00 7,394,500.00
Copper Tube dia 3/8" 27.00 m Taksir 82,000.00 2,214,000.00
Nitrous Oxide ( N )
Copper Tube dia 5/8" 18.30 m Taksir 146,000.00 2,671,800.00
Copper Tube dia 1/2" 35.20 m Taksir 115,000.00 4,048,000.00
Copper Tube dia 3/8" 9.00 m Taksir 82,000.00 738,000.00
Compressed Air ( A )
Copper Tube dia 5/8" 18.30 m Taksir 146,000.00 2,671,800.00
Copper Tube dia 1/2" 35.20 m Taksir 115,000.00 4,048,000.00
Copper Tube dia 3/8" 9.00 m Taksir 82,000.00 738,000.00
Vacuum ( V )
Copper Tube dia 3/4" 18.30 m Taksir 173,000.00 3,165,900.00
Copper Tube dia 5/8" 64.30 m Taksir 146,000.00 9,387,800.00
Copper Tube dia 1/2" 27.00 m Taksir 115,000.00 3,105,000.00
IV ACCESSORIES
SPESIFIKASI
a Flowmeter 33.00 bh Taksir 1,250,000.00 41,250,000.00
Solid Brass Body Chrome Plated for durability
Unbreakable Polycarbonate bottle
Flow rate : 15 LPM
Standard pressure : 3.5 kgf/cm2
Safety valve pressure : 0.7 kg/cm2
b Wall Suction 21.00 bh Taksir 4,000,000.00 84,000,000.00
Display type : Digital Gauge
Unbreakable polycarbonate collection bottle (1,200 cc) with -
over flow protector
Regulated vacuum range : 0 - 700 mmHg
c Bed Head 18.00 unit Taksir 2,524,000.00 45,432,000.00
Model : Bedhead single unit
Dims : 1200 mm x 80 mm x 220 mm
Assesories :
power plug Double Gang
power plug Single Gang
power switch
T4 Fluoresent Lamp for direct light
provision for nurse call
provision for medical gases
d Moveable Suction Unit 3.00 bh Taksir 2,000,000.00 6,000,000.00
Khusus Untuk Ruang OK
Type : Movable kick type
Suction gauge : 0 - 760 mmHg
Over flow protector
Moveable kick type bottle guide w/ caster
V TESTING & COMMISSIONING
Testing & Commisioning 1.00 lot Taksir 2,789,088.00 2,789,088.00
Sub Jumlah 472,021,738.00
REKAPITULASI
A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN Rp 195,975,596.00
II PEKERJAAN PONDASI & PILE CAP Rp 925,140,962.65
III PEKERJAAN TANAH Rp 4,450,443.41
IV PEKERJAAN BETON BERTULANG Rp 2,231,554,287.27
V PEKERJAAN RANGKA BAJA & PENUTUP ATAP Rp 202,046,190.10
B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA Rp 1,874,747,586.08
II PEKERJAAN PLAFOND Rp 100,339,844.39
III PEKERJAAN PENUTUP LANTAI DAN DINDING Rp 464,457,068.79
IV PEKERJAAN PENGECATAN Rp 116,740,307.94
V PEKERJAAN SANITAIR Rp 103,973,403.00
VI PEKERJAAN PENGADAAN RALLING , MEJA COUNTER & WALL PROTECTOR Rp 34,783,000.00
VII PEKERJAAN LAIN - LAIN Rp 109,300,000.00
JUMLAH Rp 6,363,508,689.63
RENCANA ANGGARAN BIAYA ( RAB )
A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN
1 Pagar Proyek 120.00 m' A.2.2.1.2 602,096.00 72,251,520.00
2 Papan Nama Proyek 1.00 Ls Taksir 1,000,000.00 1,000,000.00
3 Direksi keet 36.00 m2 A.2.2.1.5 1,912,746.00 68,858,856.00
4 Barak Kerja 20.00 m2 A.2.2.1.7 1,450,031.00 29,000,620.00
5 Pengukuran dan Bowplank 120.00 m' A.2.2.1.4 144,705.00 17,364,600.00
6 Air Kerja & Listrik 1.00 Ls Taksir 7,500,000.00 7,500,000.00
Sub Jumlah 195,975,596.00
IV. B LANTAI 02
Beton Bertulang Balok
1 Beton Bertulang Balok Tipe B1A
- Beton K - 275 23.21 m3 A.4.1.1.9 1,089,044.00 25,275,513.29
- Pembesian 4,282.67 kg A.4.1.1.17 13,300.10 56,959,999.84
- Bekisting 196.92 m2 A.4.1.1.23 261,794.50 51,553,620.12
2 Beton Bertulang Balok Tipe B2
- Beton K - 275 3.84 m3 A.4.1.1.9 1,089,044.00 4,177,845.05
- Pembesian 701.26 kg A.4.1.1.17 13,300.10 9,326,837.54
- Bekisting 37.67 m2 A.4.1.1.23 261,794.50 9,860,489.84
3 Beton Bertulang Balok Tipe B3
- Beton K - 275 5.85 m3 A.4.1.1.9 1,089,044.00 6,368,729.31
- Pembesian 1,045.93 kg A.4.1.1.17 13,300.10 13,910,979.23
- Bekisting 73.10 m2 A.4.1.1.23 261,794.50 19,137,177.95
4 Beton Bertulang Balok Tipe B5
- Beton K - 275 1.66 m3 A.4.1.1.9 1,089,044.00 1,811,951.41
- Pembesian 298.78 kg A.4.1.1.17 13,300.10 3,973,763.75
- Bekisting 26.34 m2 A.4.1.1.23 261,794.50 6,896,583.41
5 Beton Bertulang Balok Tipe BP
- Beton K - 275 4.03 m3 A.4.1.1.9 1,089,044.00 4,387,758.28
- Pembesian 614.16 kg A.4.1.1.17 13,300.10 8,168,445.34
- Bekisting 73.87 m2 A.4.1.1.23 261,794.50 19,337,450.74
IV. C LANTAI 03
Beton Bertulang Balok
1 Beton Bertulang Balok Tipe B1A
- Beton K - 275 22.95 m3 A.4.1.1.9 1,089,044.00 24,996,990.29
- Pembesian 4,229.42 kg A.4.1.1.17 13,300.10 56,251,688.85
- Bekisting 194.75 m2 A.4.1.1.23 261,794.50 50,985,526.05
2 Beton Bertulang Balok Tipe B2
- Beton K - 275 3.83 m3 A.4.1.1.9 1,089,044.00 4,167,363.00
- Pembesian 700.58 kg A.4.1.1.17 13,300.10 9,317,837.75
- Bekisting 37.57 m2 A.4.1.1.23 261,794.50 9,835,750.26
3 Beton Bertulang Balok Tipe B3
- Beton K - 275 4.63 m3 A.4.1.1.9 1,089,044.00 5,039,224.40
- Pembesian 828.25 kg A.4.1.1.17 13,300.10 11,015,767.09
- Bekisting 57.84 m2 A.4.1.1.23 261,794.50 15,142,193.88
4 Beton Bertulang Balok Tipe B5
- Beton K - 275 1.66 m3 A.4.1.1.9 1,089,044.00 1,811,951.41
- Pembesian 298.78 kg A.4.1.1.17 13,300.10 3,973,763.75
- Bekisting 26.34 m2 A.4.1.1.23 261,794.50 6,896,583.41
5 Beton Bertulang Balok Tipe BP
- Beton K - 275 2.41 m3 A.4.1.1.9 1,089,044.00 2,624,813.85
- Pembesian 365.95 kg A.4.1.1.17 13,300.10 4,867,178.51
- Bekisting 44.19 m2 A.4.1.1.23 261,794.50 11,567,913.57
B PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA
I.A LANTAI 01
Pekerjaan Pasangan Dinding
1 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 6 PS 152.96 m2 A.4.4.1.11 120,598.50 18,446,806.86
2 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 3 PS 65.55 m2 A.4.4.1.8 125,770.70 8,244,835.35
3 Plesteran bata 1 PC : 6 PS 305.92 m2 A.4.4.2.6 54,523.26 16,679,810.22
4 Plesteran bata 1 PC : 3 PS 131.11 m2 A.4.4.2.3 57,634.06 7,556,343.97
5 Acian 371.79 m2 A.4.4.2.27 32,422.50 12,054,361.28
6 Sponengan 387.30 m' A.4.4.2.20 54,704.10 21,186,897.93
7 Balok Latiu 52.14 m' A.4.1.1.29 100,741.30 5,252,651.38
8 Ring Balok 54.84 m' A.4.1.1.29 100,741.30 5,524,904.75
Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
1 Kusen Type PU1 1.00 Unit An. Kusen 1 9,496,503.50 9,496,503.50
2 Kusen Type PS 11.00 Unit An. Kusen 9 1,452,553.08 15,978,083.88
3 Kusen Type WW1 4.00 Unit An. Kusen 11 8,608,972.63 34,435,890.50
4 Kusen Type WW2 1.00 Unit An. Kusen 12 5,776,753.57 5,776,753.57
5 Kusen Type WW4 2.00 Unit An. Kusen 14 5,383,497.81 10,766,995.61
6 Kusen Type BV1 4.00 Unit An. Kusen 16 586,574.27 2,346,297.09
7 Kusen Type BV2 2.00 Unit An. Kusen 17 1,147,736.85 2,295,473.70
8 Kusen Type BV3a 5.00 Unit An. Kusen 20 1,366,354.55 6,831,772.77
I.B LANTAI 02
Pekerjaan Pasangan Dinding
1 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 6 PS 145.88 m2 A.4.4.1.11 120,598.50 17,593,331.27
2 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 3 PS 62.52 m2 A.4.4.1.8 125,770.70 7,863,372.82
3 Plesteran bata 1 PC : 6 PS 291.77 m2 A.4.4.2.6 54,523.26 15,908,088.00
4 Plesteran bata 1 PC : 3 PS 125.04 m2 A.4.4.2.3 57,634.06 7,206,735.76
5 Acian 356.43 m2 A.4.4.2.27 32,422.50 11,556,351.68
6 Sponengan 419.12 m' A.4.4.2.20 54,704.10 22,927,582.39
7 Balok Latiu 54.65 m' A.4.1.1.29 100,741.30 5,505,512.05
8 Ring Balok 55.49 m' A.4.1.1.29 100,741.30 5,590,386.59
Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
1 Kusen Type PS 11.00 Unit An. Kusen 9 1,452,553.08 15,978,083.88
2 Kusen Type WW1 5.00 Unit An. Kusen 11 8,608,972.63 43,044,863.13
3 Kusen Type WW2 1.00 Unit An. Kusen 12 5,776,753.57 5,776,753.57
4 Kusen Type WW3 2.00 Unit An. Kusen 13 3,086,941.56 6,173,883.12
5 Kusen Type WW4 2.00 Unit An. Kusen 14 5,383,497.81 10,766,995.61
6 Kusen Type WW5 1.00 Unit An. Kusen 15 7,753,698.46 7,753,698.46
7 Kusen Type BV1 3.00 Unit An. Kusen 16 586,574.27 1,759,722.81
8 Kusen Type BV2 2.00 Unit An. Kusen 17 1,147,736.85 2,295,473.70
9 Kusen Type BV3 2.00 Unit An. Kusen 18 1,454,101.07 2,908,202.15
10 Kusen Type BV3a 1.00 Unit An. Kusen 20 1,366,354.55 1,366,354.55
I.C LANTAI 03
Pekerjaan Pasangan Dinding
1 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 6 PS 1,233.82 m2 A.4.4.1.11 120,598.50 148,797,432.20
2 Pasangan dinding bata tebal 1/2 bata camp. 1 PC : 3 PS 584.78 m2 A.4.4.1.8 125,770.70 73,548,579.84
3 Plesteran bata 1 PC : 6 PS 2,467.65 m2 A.4.4.2.6 54,523.26 134,544,311.63
4 Plesteran bata 1 PC : 3 PS 1,169.57 m2 A.4.4.2.3 57,634.06 67,406,848.54
5 Acian 3,581.91 m2 A.4.4.2.27 32,422.50 116,134,606.67
6 Sponengan 869.14 m' A.4.4.2.20 54,704.10 47,545,521.47
7 Balok Latiu 100.25 m' A.4.1.1.29 100,741.30 10,099,315.33
8 Ring Balok 325.30 m' A.4.1.1.29 100,741.30 32,771,094.52
Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
3 Kusen Type P2 5.00 Unit An. Kusen 3 6,836,578.01 34,182,890.05
4 Kusen Type P3 12.00 Unit An. Kusen 4 3,185,446.84 38,225,362.03
5 Kusen Type P4 4.00 Unit An. Kusen 5 3,292,275.66 13,169,102.65
6 Kusen Type P5 1.00 Unit An. Kusen 6 3,259,682.37 3,259,682.37
7 Kusen Type P6 1.00 Unit An. Kusen 7 3,112,769.29 3,112,769.29
8 Kusen Type P.O 3.00 Unit An. Kusen 8 176,000,000.00 528,000,000.00
9 Kusen Type PS 11.00 Unit An. Kusen 9 1,452,553.08 15,978,083.88
10 Kusen Type AG 12.00 Unit An. Kusen 10 500,769.46 6,009,233.47
11 Kusen Type WW1 2.00 Unit An. Kusen 11 8,608,972.63 17,217,945.25
12 Kusen Type WW2 1.00 Unit An. Kusen 12 5,776,753.57 5,776,753.57
13 Kusen Type WW3 2.00 Unit An. Kusen 13 3,086,941.56 6,173,883.12
14 Kusen Type WW4 2.00 Unit An. Kusen 14 5,383,497.81 10,766,995.61
15 Kusen Type WW5 1.00 Unit An. Kusen 15 7,753,698.46 7,753,698.46
16 Kusen Type BV1 5.00 Unit An. Kusen 16 586,574.27 2,932,871.36
17 Kusen Type BV2 1.00 Unit An. Kusen 17 1,147,736.85 1,147,736.85
18 Kusen Type BV3 8.00 Unit An. Kusen 18 1,454,101.07 11,632,808.59
19 Kusen Type BV2a 2.00 Unit An. Kusen 19 1,092,686.11 2,185,372.22
20 Kusen Type BV3a 6.00 Unit An. Kusen 20 1,366,354.55 8,198,127.33
21 PASS BOX 3.00 Unit Taksir 33,000,000.00 99,000,000.00
Pekerjaan Kusen
Pekerjaan Kusen Alumunium Powder Coating ukuran 4" ,Kayu, Daun Pintu,
Daun Jendela , lengkap dengan asesories, sesuai gambar dan spesifikasi
1 Kusen Type P3 1.00 Unit An. Kusen 4 3,185,446.84 3,185,446.84
Sub Jumlah 1,874,747,586.08
II PEKERJAAN PLAFOND
II.A LANTAI 01
1 Plafond Gypsum 9 mm finish cat rangka hollow :
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 453.80 m2 A.4.5.1.7 25,469.40
- langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm 453.80 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 453.80 m2 A.4.7.1.10 22,011.00
2 Plafond Kalsiboard 6 mm finish cat rangka hollow
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 13.43 m2 A.4.5.1.8 24,868.80
- langit-langit kalsium silikat uk. (120 x 240) cm, tebal 6 mm 13.43 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 13.43 m2 A.4.7.1.10 22,011.00
3 Pasang list plafond gipsum 377.61 m' A.4.5.1.9 15,631.00
4 Finishing Beton Ekspose
- Acian 17.24 m2 A.4.4.2.27 32,422.50
- Cat Interior 17.24 m2 A.4.7.1.10 22,011.00
II.B LANTAI 02
1 Plafond Gypsum 9 mm finish cat rangka hollow :
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 446.35 m2 A.4.5.1.7 25,469.40
- langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm 446.35 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 446.35 m2 A.4.7.1.10 22,011.00
2 Plafond Kalsiboard 6 mm finish cat rangka hollow
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 32.81 m2 A.4.5.1.8 24,868.80
- langit-langit kalsium silikat uk. (120 x 240) cm, tebal 6 mm 32.81 m2 A.4.2.1.21 139,557.00
- Finishing Cat Plafond 32.81 m2 A.4.7.1.10 22,011.00
3 Pasang list plafond gipsum 398.60 m' A.4.5.1.9 15,631.00
4 Finishing Beton Ekspose
- Acian 17.24 m2 A.4.4.2.27 32,422.50
- Cat Interior 17.24 m2 A.4.7.1.10 22,011.00
II.C LANTAI 03
1 Plafond Gypsum 9 mm finish cat rangka hollow :
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 470.31 m2 A.4.5.1.7 25,469.40 11,978,551.72
- langit-langit gypsum board uk. (120 x 240) cm, tebal 9 mm 470.31 m2 A.4.2.1.21 139,557.00 65,635,262.01
- Finishing Cat Plafond 470.31 m2 A.4.7.1.10 22,011.00 10,352,026.43
2 Plafond Kalsiboard 6 mm finish cat rangka hollow
- Rangka besi hollow 1 x 40.40.0,4 mm modul 60 x 60 cm plafond 9.51 m2 A.4.5.1.8 24,868.80 236,524.67
- langit-langit kalsium silikat uk. (120 x 240) cm, tebal 6 mm 9.51 m2 A.4.2.1.21 139,557.00 1,327,312.67
- Finishing Cat Plafond 9.51 m2 A.4.7.1.10 22,011.00 209,344.42
3 Pasang list plafond gipsum 483.69 m' A.4.5.1.9 15,631.00 7,560,542.76
4 Finishing Beton Ekspose
- Acian 17.24 m2 A.4.4.2.27 32,422.50 558,801.79
- Cat Interior 17.24 m2 A.4.7.1.10 22,011.00 379,359.59
III.B LANTAI 02
1 Urugan Pasir bawah Lantai 24.68 m3 A.2.3.1.11 283,140.00
2 Pasang Granite Tile ukuran 60 x 60 cm 452.83 m2 A.4.4.3.a 397,905.20
3 Pasang Keramik Lantai Unpolished ukuran 30 x 30 cm 32.81 m2 A.4.4.3.35 265,250.70
4 Pasang Plint Lantai 331.90 m' A.4.4.3.41.a 66,786.50
5 Pasang Step Nosing Tangga 36.00 m' A.4.4.3.41.d 78,124.75
6 Pasang Keramik Dinding ukuran 30 x 60 cm 60.38 m2 A.4.4.3.50.a 333,525.50
7 Pasang Border Keramik Dinding 24.10 m' A.4.4.3.41.e 77,951.50
8 Pasang Granite Alam untuk finishing Dinding Luar Lift 17.36 m2 A.4.4.3.58 1,199,279.52
III.C LANTAI 03
1 Urugan Pasir bawah Lantai 24.71 m3 A.2.3.1.11 283,140.00 6,996,893.39
2 Pasang Granite Tile ukuran 60 x 60 cm 351.37 m2 A.4.4.3.a 397,905.20 139,813,820.28
3 Pasang Keramik Lantai Unpolished ukuran 30 x 30 cm 12.57 m2 A.4.4.3.35 265,250.70 3,334,174.77
4 Pekerjaan Pemasangan Lantai Vynil (OK 1, 2 dan 3)
- Beton Screed K - 250 12.35 m3 A.4.1.1.8 1,067,430.22 13,182,862.30
- Acian Lantai 128.65 m2 A.4.4.2.27 32,422.50 4,171,050.87
- Pasang Lantai Vynil 128.65 m2 Taksir 585,000.00 75,258,378.00
5 Pasang Plint Lantai 325.77 m' A.4.4.3.41.a 66,786.50 21,757,305.25
6 Pasang Hospital Plint 75.13 m' A.4.4.3.41.f 103,405.26 7,768,320.38
7 Pasang Keramik Dinding ukuran 30 x 60 cm 55.30 m2 A.4.4.3.50.a 333,525.50 18,444,627.20
8 Pasang Border Keramik Dinding 21.99 m' A.4.4.3.41.e 77,951.50 1,714,153.49
9 Pasang Granite Alam untuk finishing Dinding Luar Lift 17.36 m2 A.4.4.3.58 1,199,279.52 20,819,492.39
10 Pekerjaan Pemasangan Dinding Vynil 238.65 m2 Taksir 585,000.00 139,610,250.00
IV PEKERJAAN PENGECATAN
IV.A LANTAI 01
1 Cat tembok Interior 260.25 m2 A.4.7.1.10 22,011.00
2 Cat tembok Eksterior 111.54 m2 A.4.7.1.10b 40,029.00 4,464,714.57
IV.B LANTAI 02
1 Cat tembok Interior 249.50 m2 A.4.7.1.10 22,011.00
2 Cat tembok Eksterior 106.93 m2 A.4.7.1.10b 40,029.00 4,280,260.94
IV.C LANTAI 03
1 Cat tembok Interior 2,507.34 m2 A.4.7.1.10 22,011.00 55,189,056.34
2 Cat tembok Eksterior 1,074.57 m2 A.4.7.1.10b 40,029.00 43,014,130.65
V PEKERJAAN SANITAIR
V.A LANTAI 01
Pekerjaan dan Pengadaaan Peralatan Sanitasi
1 Floor drain 5.00 Unit A.5.1.1.14 45,320.00
2 Kran Air Standar 5.00 Unit A.5.1.1.19 67,325.50
4 Jet Washer 5.00 Unit Taksir 250,000.00
5 Hand Shower 5.00 Unit Taksir 1,600,000.00
6 Kloset Duduk 5.00 Unit A.5.1.1.1 2,554,200.00
14 Tempat Tissue 5.00 Unit Taksir 173,000.00
15 Gantungan Handuk 5.00 Unit Taksir 150,000.00
16 Tempat Sabun 5.00 Unit Taksir 206,000.00
V.B LANTAI 02
Pekerjaan dan Pengadaaan Peralatan Sanitasi
1 Floor drain 5.00 Unit A.5.1.1.14 45,320.00
2 Kran Air Standar 4.00 Unit A.5.1.1.19 67,325.50
3 Kran Air Panjang 2.00 Unit A.5.1.1.19.a 152,960.50
4 Jet Washer 3.00 Unit Taksir 250,000.00
5 Hand Shower 3.00 Unit Taksir 1,600,000.00
6 Kloset Duduk 1.00 Unit A.5.1.1.1 2,554,200.00
7 Kloset Jongkok 2.00 Unit A.5.1.1.2 575,487.00
9 Wastafel Meja 1.00 Unit A.5.1.1.5 549,802.00
10 Kaca Cermin 1.00 Unit Taksir 200,000.00
11 Washba Stainless 3.00 Unit A.5.1.1.12.a 322,960.00
12 Meja Beton
a. Beton K175 0.13 m3 A.4.1.1.5 1,016,238.67
b. Pembesian 12.96 kg A.4.1.1.17 13,300.10
c. Bekisting 1.62 m2 A.4.1.1.24 300,872.00
d. Finishing Granite Tile 1.89 m2 A.4.4.3.a 397,905.20
14 Tempat Tissue 3.00 Unit Taksir 173,000.00
15 Gantungan Handuk 3.00 Unit Taksir 150,000.00
16 Tempat Sabun 3.00 Unit Taksir 206,000.00
V.C LANTAI 03
Pekerjaan dan Pengadaaan Peralatan Sanitasi
1 Floor drain 2.00 Unit A.5.1.1.14 45,320.00 90,640.00
2 Kran Air Standar 4.00 Unit A.5.1.1.19 67,325.50 269,302.00
3 Jet Washer 3.00 Unit Taksir 250,000.00 750,000.00
4 Kloset Jongkok 3.00 Unit A.5.1.1.2 575,487.00 1,726,461.00
5 Tempat Tissue 3.00 Unit Taksir 173,000.00 519,000.00
6 Tempat Sabun 3.00 Unit Taksir 206,000.00 618,000.00
7 Bak Scrub station be hospital Equipment automatic sensor, 1.00 Unit Taksir 100,000,000.00 100,000,000.00
stainless steel, plat 1.2mm pipa 1.2 mm, finishing polished
dimensi 160 x 65 x 185, power suplay 250W 220 V AC 50Hz
Filtering & UV Sterilizer system, filter :1 pcs main filter 0.2 micron
UV Lamp 2 pcs 30W, acessories Aluminium Water tab, kran (2 unit)
Sub Jumlah 103,973,403.00
VI.A LANTAI 02
1 Pekerjaan Ralling Tangga 31.64 m' Taksir 950,000.00
2 Pekerjaan Meja Counter :
- Nurse Station 14.47 m' Taksir 3,500,000.00
3 Pekerjaan Wall Protector 48.76 m' Taksir 650,000.00
VIC LANTAI 03
1 Pekerjaan Ralling Tangga 31.64 m' Taksir 950,000.00 30,058,000.00
2 Pekerjaan Meja Counter :
- Administrasi 1.35 m' Taksir 3,500,000.00 4,725,000.00
Sub Jumlah 34,783,000.00
XV An. Kusen HARGA SATUAN PEKERJAAN KUSEN, DAUN PINTU & JENDELA
1 An. Kusen 1 Type PU1
Kusen Alumunium 4 " powder coating 25.00 m' 143,682.51 3,592,062.73
Kaca Tempered 12 mm 7.88 m2 178,487.53 1,406,481.75
Daun Pintu Kaca Tempered 12 mm 3.87 m2 1,105,000.00 4,276,350.00
Glass Door Handle 2.00 Pasang 230,000.00 460,000.00
Floor Hinges 2.00 buah 880,000.00 1,760,000.00
Patch Fitting 4.00 buah 162,500.00 650,000.00
Patch Lock 2.00 buah 253,500.00 507,000.00
Double Cylinder 2.00 buah 97,500.00 195,000.00
Beton Bertulang Gawangan Pintu :
- Beton Bertulang 0.55 m3 3,500,000.00 7,848,350.00
Finish Granite Untuk Gawangan Pintu 11.50 m2 350,000.00 784,835.00
Sub Jumlah 8,633,185.00
Perlengkapan dan Pemasangan 863,318.50
Jumlah Total 9,496,503.50
XV An. Kusen HARGA SATUAN PEKERJAAN KUSEN, DAUN PINTU & JENDELA
1 An. Kusen 1 Pemasangan & Pembuatan Kusen Type PU1 Unit 9,496,503.50
2 An. Kusen 2 Pemasangan & Pembuatan Kusen Type P1 Unit 5,609,728.19
3 An. Kusen 3 Pemasangan & Pembuatan Kusen Type P2 Unit 6,836,578.01
4 An. Kusen 4 Pemasangan & Pembuatan Kusen Type P3 Unit 3,185,446.84
5 An. Kusen 5 Pemasangan & Pembuatan Kusen Type P4 Unit 3,292,275.66
6 An. Kusen 6 Pemasangan & Pembuatan Kusen Type P5 Unit 3,259,682.37
7 An. Kusen 7 Pemasangan & Pembuatan Kusen Type P6 Unit 3,112,769.29
8 An. Kusen 8 Pemasangan & Pembuatan Kusen Type P.O Unit 176,000,000.00
9 An. Kusen 9 Pemasangan & Pembuatan Kusen Type PS Unit 1,452,553.08
10 An. Kusen 10 Pemasangan & Pembuatan Kusen Type AG Unit 500,769.46
11 An. Kusen 11 Pemasangan & Pembuatan Kusen Type WW1 Unit 8,608,972.63
12 An. Kusen 12 Pemasangan & Pembuatan Kusen Type WW2 Unit 5,776,753.57
13 An. Kusen 13 Pemasangan & Pembuatan Kusen Type WW3 Unit 3,086,941.56
14 An. Kusen 14 Pemasangan & Pembuatan Kusen Type WW4 Unit 5,383,497.81
15 An. Kusen 15 Pemasangan & Pembuatan Kusen Type WW5 Unit 7,753,698.46
16 An. Kusen 16 Pemasangan & Pembuatan Kusen Type BV1 Unit 586,574.27
17 An. Kusen 17 Pemasangan & Pembuatan Kusen Type BV2 Unit 1,147,736.85
18 An. Kusen 18 Pemasangan & Pembuatan Kusen Type BV3 Unit 1,454,101.07
19 An. Kusen 19 Pemasangan & Pembuatan Kusen Type BV2a Unit 1,092,686.11
20 An. Kusen 20 Pemasangan & Pembuatan Kusen Type BV3a Unit 1,366,354.55
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
4 A.2.3.1.9 1.000
m3 Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian 15,400.00
A TENAGA 42,000.00
L.01 0.500 OH Pekerja 75,000.00 37,500.00
L.04 0.050 OH Mandor 90,000.00 4,500.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 42,000.00
E Overhead & Profit 10% 4,200.00
F Harga Satuan Pekerjaan (D+E) 46,200.00
2 A.4.1.1.5 1.000 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 1,016,238.67
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 765,083.33
326.000 Kg Portland Semen 1,100.00 358,600.00
760.000 Kg Pasir Beton 280.00 212,800.00
1,029.000 Kg Kriss / Split 177.78 182,933.33
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 923,853.33
E Overhead & Profit 10% 92,385.33
F Harga Satuan Pekerjaan (D+E) 1,016,238.67
3 A.4.1.1.6 1.000 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61 1,039,157.78
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 785,918.89
352.000 Kg Portland Semen 1,100.00 387,200.00
731.000 Kg Pasir Beton 280.00 204,680.00
1,031.000 Kg Kriss / Split 177.78 183,288.89
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 944,688.89
E Overhead & Profit 10% 94,468.89
F Harga Satuan Pekerjaan (D+E) 1,039,157.78
4 A.4.1.1.7 1.000 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1,055,112.67
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 800,423.33
371.000 Kg Portland Semen 1,100.00 408,100.00
698.000 Kg Pasir Beton 280.00 195,440.00
1,047.000 Kg Kriss / Split 177.78 186,133.33
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 959,193.33
E Overhead & Profit 10% 95,919.33
F Harga Satuan Pekerjaan (D+E) 1,055,112.67
5 A.4.1.1.8 1.000 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56 1,067,430.22
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 811,621.11
384.000 Kg Portland Semen 1,100.00 422,400.00
692.000 Kg Pasir Beton 280.00 193,760.00
1,039.000 Kg Kriss / Split 177.78 184,711.11
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 970,391.11
E Overhead & Profit 10% 97,039.11
F Harga Satuan Pekerjaan (D+E) 1,067,430.22
6 A.4.1.1.9 1.000 m3 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c 1,089,044.00
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 831,270.00
406.000 Kg Portland Semen 1,100.00 446,600.00
684.000 kg Pasir Beton 280.00 191,520.00
1,026.000 kg Kriss / Split 177.78 182,400.00
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 990,040.00
E Overhead & Profit 10% 99,004.00
F Harga Satuan Pekerjaan (D+E) 1,089,044.00
7 A.4.1.1.10 1.000 m3 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52 1,095,612.22
A Tenaga 158,770.00
L.01 1.650 OH Pekerja 75,000.00 123,750.00
L.02 0.275 OH Tukang Batu 90,000.00 24,750.00
L.03 0.028 OH Kepala Tukang 100,000.00 2,800.00
L.04 0.083 OH Mandor 90,000.00 7,470.00
B Bahan 837,241.11
413.000 Kg Portland Semen 1,100.00 454,300.00
681.000 Kg Pasir Beton 280.00 190,680.00
1,021.000 Kg Kriss / Split 177.78 181,511.11
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 996,011.11
E Overhead & Profit 10% 99,601.11
F Harga Satuan Pekerjaan (D+E) 1,095,612.22
8 A.4.1.1.11 1.000 m3 Membuat Beton mutu f'c=28,8 MPa (K325), slum (12±2)cm, w/c = 0,49 1,168,248.89
A Tenaga 201,950.00
L.01 2.100 OH Pekerja 75,000.00 157,500.00
L.02 0.350 OH Tukang Batu 90,000.00 31,500.00
L.03 0.035 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.105 OH Mandor 90,000.00 9,450.00
B Bahan 860,094.44
439.000 Kg Portland Semen 1,100.00 482,900.00
670.000 Kg Pasir Beton 280.00 187,600.00
1,006.000 Kg Kriss / Split 177.78 178,844.44
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 1,062,044.44
E Overhead & Profit 10% 106,204.44
F Harga Satuan Pekerjaan (D+E) 1,168,248.89
9 A.4.1.1.12 1.000 m3 Membuat Beton mutu f'c=31,2 MPa (K350), slum (12±2)cm, w/c = 0,48 1,177,041.56
A Tenaga 201,950.00
L.01 2.100 OH Pekerja 75,000.00 157,500.00
L.02 0.350 OH Tukang Batu 90,000.00 31,500.00
L.03 0.035 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.105 OH Mandor 90,000.00 9,450.00
B Bahan 868,087.78
448.000 Kg Portland Semen 1,100.00 492,800.00
667.000 Kg Pasir Beton 280.00 186,760.00
1,000.000 Kg Kriss / Split 177.78 177,777.78
215.000 ltr Air 50.00 10,750.00
C PERALATAN
D Jumlah A + B + C 1,070,037.78
E Overhead & Profit 10% 107,003.78
F Harga Satuan Pekerjaan (D+E) 1,177,041.56
18 A.4.1.1.28 1.000 m' Membuat Kolom Penguat Beton Bertulang (11 x 11) cm 81,679.40
A Tenaga 20,310.00
L.01 0.180 OH Pekerja 75,000.00 13,500.00
L.02 0.020 OH Tukang batu 90,000.00 1,800.00
L.02 0.020 OH Tukang Kayu 90,000.00 1,800.00
L.02 0.020 OH Tukang Besi 90,000.00 1,800.00
L.03 0.006 OH Kepala Tukang 100,000.00 600.00
L.04 0.009 OH Mandor 90,000.00 810.00
B Bahan 53,944.00
0.002 m3 Kayu Klas III 2,500,000.00 5,000.00
0.010 Kg Paku Biasa 2" - 5" 15,000.00 150.00
3.000 Kg Besi Beton Polos 10,000.00 30,000.00
0.450 Kg Kawat Beton 22,000.00 9,900.00
4.000 Kg Portland Semen 1,100.00 4,400.00
0.006 m3 Pasir Beton 392,000.00 2,352.00
0.009 m3 Kerikil 238,000.00 2,142.00
C PERALATAN
D Jumlah A + B + C 74,254.00
E Overhead & Profit 10% 7,425.40
F Harga Satuan Pekerjaan (D+E) 81,679.40
19 A.4.1.1.29 1.000 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm 100,741.30
A Tenaga 33,535.00
L.01 0.297 OH Pekerja 75,000.00 22,275.00
L.02 0.033 OH Tukang batu 90,000.00 2,970.00
L.02 0.033 OH Tukang Kayu 90,000.00 2,970.00
L.02 0.033 OH Tukang Besi 90,000.00 2,970.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 58,048.00
0.003 m3 Kayu Klas III 2,500,000.00 7,500.00
0.020 Kg Paku Biasa 2" - 5" 15,000.00 300.00
3.600 Kg Besi Beton Polos 10,000.00 36,000.00
0.050 Kg Kawat Beton 22,000.00 1,100.00
5.500 Kg Portland Semen 1,100.00 6,050.00
0.009 m3 Pasir Beton 392,000.00 3,528.00
0.015 m3 Kerikil 238,000.00 3,570.00
C PERALATAN
D Jumlah A + B + C 91,583.00
E Overhead & Profit 10% 9,158.30
F Harga Satuan Pekerjaan (D+E) 100,741.30
4 A.4.2.1.11 1.000 m' Pemasangan Kusen Alumunium 4" Powder Coating 164,685.40
A Tenaga 7,714.00
L.01 0.043 OH Pekerja 75,000.00 3,225.00
L.02 0.043 OH Tukang Besi 90,000.00 3,870.00
L.03 0.004 OH Kepala Tukang 100,000.00 430.00
L.04 0.002 OH Mandor 90,000.00 189.00
B Bahan 142,000.00
1.100 m' Profil Aluminium 125,000.00 137,500.00
2.000 buah Skrup Fixer 750.00 1,500.00
0.060 Tube Sealant 50,000.00 3,000.00
C PERALATAN
D Jumlah A + B + C 149,714.00
E Overhead & Profit 10% 14,971.40
F Harga Satuan Pekerjaan (D+E) 164,685.40
5 A.4.2.1.21 1.000 m2 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding pl 139,557.00
A Tenaga 62,870.00
L.01 0.350 OH Pekerja 75,000.00 26,250.00
L.02 0.350 OH Tukang Besi 90,000.00 31,500.00
L.03 0.035 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.018 OH Mandor 90,000.00 1,620.00
B Bahan 64,000.00
4.000 m' Rangka metal hollow 40.40.2 mm 8,000.00 32,000.00
1.000 **) Assesoris (perkuatan; las dll) 32,000.00 32,000.00
**) 100% x rangka
C PERALATAN
D Jumlah A + B + C 126,870.00
E Overhead & Profit 10% 12,687.00
F Harga Satuan Pekerjaan (D+E) 139,557.00
2 A.4.4.1.11 1.000 m2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 120,598.50
A Tenaga 33,850.00
L.01 0.300 OH Pekerja 75,000.00 22,500.00
L.02 0.100 OH Tukang Batu 90,000.00 9,000.00
L.03 0.010 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 75,785.00
70.000 Buah Bata Merah 5 x 11 x 22 800.00 56,000.00
8.320 Kg Portland Semen 1,100.00 9,152.00
0.049 m3 Pasir Pasang 217,000.00 10,633.00
C PERALATAN
D Jumlah A + B + C 109,635.00
E Overhead & Profit 10% 10,963.50
F Harga Satuan Pekerjaan (D+E) 120,598.50
3 A.4.4.1.21 1.0000 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP 185,946.82
A TENAGA 33,850.00
L.01 0.3000 OH Pekerja 75,000.00 22,500.00
L.02 0.1000 OH Tukang Batu 90,000.00 9,000.00
L.03 0.0100 OH Kepala Tukang 100,000.00 1,000.00
L.04 0.0150 OH Mandor 90,000.00 1,350.00
B BAHAN 135,192.56
12.5000 buah Batako 2,727.20 34,090.00
12.1300 kg PC 1,100.00 13,343.00
0.3880 m3 Pasir Pasang 217,000.00 84,196.00
0.2800 kg Besi Angkur Ø 8 mm 12,727.00 3,563.56
C PERALATAN
D Jumlah A + B + C 169,042.56
E Overhead & Profit 10% 16,904.26
F Harga Satuan Pekerjaan (D+E) 185,946.82
12 A.4.4.3.58.b 1.0000 m2 Pemasangan Dinding Batu Paros / Batu Tempel Hitam 267,487.00
A TENAGA 90,650.00
L.01 0.7000 OH Pekerja 75,000.00 52,500.00
L.02 0.3500 OH Tukang Batu 90,000.00 31,500.00
L.03 0.0350 OH Kepala Tukang 100,000.00 3,500.00
L.04 0.0350 OH Mandor 90,000.00 3,150.00
B BAHAN 152,520.00
1.1000 m2 Batu Paros 120,000.00 132,000.00
11.7500 Kg Portland Semen 1,100.00 12,925.00
0.0350 m3 Pasir Pasang 217,000.00 7,595.00
C PERALATAN
D Jumlah A + B + C 243,170.00
E Overhead & Profit 10% 24,317.00
F Harga Satuan Pekerjaan (D+E) 267,487.00
2 A.4.5.1.8 1.000 m2 Memasang Langit-langit Kalsium Silikat Board, Ukuran (120x240) tebal 6 mm 24,868.80
A Tenaga 12,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.050 OH Tukang Kayu 90,000.00 4,500.00
L.03 0.005 OH Kepala Tukang 100,000.00 500.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 9,658.00
0.364 Lbr Kalsi Board 6 mm 22,000.00 8,008.00
0.110 Kg Paku Sekrup 15,000.00 1,650.00
C PERALATAN
D Jumlah A + B + C 22,608.00
E Overhead & Profit 10% 2,260.80
F Harga Satuan Pekerjaan (D+E) 24,868.80
2 A.4.6.1.6 1.000 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II 602,085.00
A Tenaga 303,600.00
L.01 0.800 OH Pekerja 75,000.00 60,000.00
L.02 2.400 OH Tukang Kayu 90,000.00 216,000.00
L.03 0.240 OH Kepala Tukang 100,000.00 24,000.00
L.04 0.040 OH Mandor 90,000.00 3,600.00
B Bahan 243,750.00
0.024 m3 Kayu Klas II (Kamfer), papan 10,000,000.00 240,000.00
0.300 kg Lem Kayu 12,500.00 3,750.00
C PERALATAN
D Jumlah A + B + C 547,350.00
E Overhead & Profit 10% 54,735.00
F Harga Satuan Pekerjaan (D+E) 602,085.00
3 A.4.6.1.21 1.000 m' Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II 151,195.00
A Tenaga 27,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.200 OH Tukang Kayu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 109,500.00
0.011 m3 Kayu klas I (Jati), papan 10,000,000.00 108,000.00
0.100 Kg Paku Biasa 2" - 5" 15,000.00 1,500.00
C PERALATAN
D Jumlah A + B + C 137,450.00
E Overhead & Profit 10% 13,745.00
F Harga Satuan Pekerjaan (D+E) 151,195.00
4 A.4.6.1.22 1.000 m' Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 152,570.00
A Tenaga 27,950.00
L.01 0.100 OH Pekerja 75,000.00 7,500.00
L.02 0.200 OH Tukang Kayu 90,000.00 18,000.00
L.03 0.020 OH Kepala Tukang 100,000.00 2,000.00
L.04 0.005 OH Mandor 90,000.00 450.00
B Bahan 110,750.00
0.011 m3 Kayu klas II (Kamfer), papan 10,000,000.00 110,000.00
0.050 Kg Paku Biasa 2" - 5" 15,000.00 750.00
C PERALATAN
D Jumlah A + B + C 138,700.00
E Overhead & Profit 10% 13,870.00
F Harga Satuan Pekerjaan (D+E) 152,570.00
3 A.4.7.1.4 1.000 m2 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutu 40,656.00
A Tenaga 8,070.00
L.01 0.020 OH Pekerja 75,000.00 1,500.00
L.02 0.063 OH Tukang Cat 90,000.00 5,670.00
L.03 0.006 OH Kepala Tukang 100,000.00 630.00
L.04 0.003 OH Mandor 90,000.00 270.00
B Bahan 28,890.00
0.2000 Kg Cat Menie 25,000.00 5,000.00
0.1500 Kg Plamur 22,500.00 3,375.00
0.1700 Kg Cat Dasar 34,000.00 5,780.00
0.2600 Kg Cat Penutup 52,500.00 13,650.00
0.0100 bh Kuas 7,500.00 75.00
0.0300 Kg Pengencer 17,000.00 510.00
0.2000 lbr Amplas 2,500.00 500.00
C PERALATAN
D Jumlah A + B + C 36,960.00
E Overhead & Profit 10% 3,696.00
F Harga Satuan Pekerjaan (D+E) 40,656.00
4 A.5.1.1.12 1.000 buah Pemasangan Bak Cuci Piring Stainless Stell 339,460.00
A Tenaga 33,600.00
L.01 0.030 OH Pekerja 75,000.00 2,250.00
L.02 0.300 OH Tukang Batu 90,000.00 27,000.00
L.03 0.030 OH Kepala Tukang 100,000.00 3,000.00
L.04 0.015 OH Mandor 90,000.00 1,350.00
B Bahan 275,000.00
1.000 unit Bak Cuci Piring 225,000.00 225,000.00
1.000 bh Water drain 50,000.00 50,000.00
C PERALATAN
D Jumlah A + B + C 308,600.00
E Overhead & Profit 10% 30,860.00
F Harga Satuan Pekerjaan (D+E) 339,460.00
I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 170,000
Bulat Belah m3 180,000
Pecah 10/15 m3 238,000
Pecah 5/7 m3 238,000
Pecah 3/5 m3 238,000
2 KERIKIL Timbun m3 185,000
Sawur / Koral m3 185,000
Beton 0,5/1 m3 244,000
Beton 1/2 m3 240,000
Beton 2/3 m3 250,000
Biasa m3 240,000
Tras Giling m3 290,000
3 BATU BATA ex lokal bh 800
III . B A H A N K A Y U
1 JATI Papan m3 19,000,000
Balok/pesagen m3 19,000,000
2 KAMPER Papan m3 10,000,000
Balok/pesagen m3 8,500,000
3 KRUING Papan m3 6,500,000
Balok/pesagen m3 5,650,000
6 BENGKIRAI Papan m3 11,500,000
Balok/pesagen m3 10,000,000
7 DOLKEN Sedang 8 x 10 x 400 cm bt 22,000
Kecil 6 x 7 x 400 cm bt 22,000
Besar 10 x 12 x 400 cm bt 22,000
Kayu cetakan m3 2,500,000
Kayu bakar m3 110,000
Bambu bt 22,000
IV . BAHAN PENUTUP DINDING / LANTAI
1 POLIS UBIN
Plint Granite 10 x 60 m' 40,333.33
Plint Keramik 10 x 60 m' 17,500.00
Plint Alumunium m' 75,000.00
Step Nosing 10 x 60 m' 50,150.00
Border Keramik 10 x 30 m' 50,000.00
Hospital Plint m' 72,037.89
2 GRANITE TILE
60 x 60 cm m2 240,000.00
3 KERAMIK
30 X 30 cm m2 116,600.00
30 X 60 cm m2 159,500.00
60 x 60 cm Polished m2 175,000.00
60 x 60 cm Unolished m2 175,000.00
5 BATU ALAM
Batu Paros m2 120,000.00
Batu Tempel Hitam m2 115,000.00
Granite Alam m2 850,000.00
V.BAHAN CETAK
BUIS BETON Ø 20 cm - 100 cm bh 51,000
Ø 30 cm - 100 cm bh 71,000
U 20 cm - 100 cm bh 39,000
U 30 cm - 100 cm bh 48,000
2 LUBANG ANGIN (ROSTER) PC + PASIR
20 X 20 cm bh 15,000
VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000
besi beton prestress kg 10,000
besi beton ulir kg 10,000
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 21,000 panjang 4 m
Pipa PVC DN 25 ( ¾" ) AW JIS btg 27,000 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 44,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 43,000 panjang 4 m
Pipa PVC DN 63 ( 2" ) btg 55,000 panjang 4 m
Pipa PVC DN 90 ( 3" ) btg 89,000 panjang 4 m
VIII . B A H A N L A N G I T - L A N G I T
1 List Gypsum m' 4,800
2 Gypsum tebal 9 mm lbr 23,500
3 Kalsi Board 6 mm lbr 22,000
4 Formika ukuran pintu lbr 68,000
IX . B A H A N F I N I S H I N G
1 TEMBOK
Cat Tembok Eksterior (setara Mowilex) kg 92,000
Cat Tembok Interior (setara Catylac) kg 29,000
2 BESI
Men Besi kg 32,000
X.BAHAN KACA
1 POLOS 3 mm m2 82,000
5 mm m2 128,000
2 ES KABUR 3 mm m2 100,000
5 mm m2 134,000
3 RAY BAND 3 mm m2 85,000
5 mm m2 130,000
11 LAIN - LAIN
Kran Air bh 20,000
Seal tape bh 2,000
Floor drain bh 30,000
XVII. L A I N - L A I N
Minyak Beton & bekisting ltr 9,000
Profil Aluminium m' 125,000
Pintu Lipat Besi m2 380,000
Sunscreen Allumunim m2 310,000
Allumunium Foil m2 7,500
Soda api kg 12,000
Sabun kg 11,000
Air m3 15,000
Koas Alang-alang ikat 1,250
Solar (Industri) ltr 7,000
Premium (Industri) ltr 6,200
Pelumas ltr 37,500
Vynil 30x30 cm bh 6,200
DAFTAR UPAH PEKERJA
1 Pekerja
2 Mandor
3 Tukang listrik
4 Tukang kayu
5 Kep . tk . kayu
6 Tukang batu
7 Kep . tk . Batu
8 Tukang besi
PEKERJAAN KOLOM pondasi
A PEKERJAAN PONDASI :
*) PEKERJAAN STRAUS PILE
TYPE JUMLAH TITIK Σ TITIK L ΣL
PILE CAP BORED BORED BORED
PC1 1.00 1.00 1.00 12.00 12.00
PC2 3.00 2.00 6.00 12.00 72.00
PC3 12.00 3.00 36.00 12.00 432.00
PC4 7.00 4.00 28.00 12.00 336.00
PC5L 1.00 5.00 5.00 12.00 60.00
114.55 m3
88.92 m3
4.62 m3
4.92 m3
BETON 0.32 m3
BESI 31.67 kg
BEKISTING 1.60 m2
PC2
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC2 3.00 2.00 0.80 0.50 2.40 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 3.00 14.33 1.45 1.04 64.96 kg
13 0.15 3.00 6.33 2.14 1.04 42.36 kg
BAWAH 19 0.15 3.00 14.33 0.95 2.23 90.91 kg
19 0.15 3.00 6.33 2.60 2.23 109.94 kg
308.18 kg
Per m3 128.41 kg
BEKISTING Jumlah X Y H VOL
3.00 2.00 0.80 0.50 8.40 m2
Per m3 3.50 m2
BETON 2.40 m3
BESI 308.18 kg
BEKISTING 8.40 m2
PC3
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC3 12.00 2.00 1.84 0.70 30.91 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 12.00 14.33 2.89 1.04 517.36 kg
13 0.15 12.00 13.27 3.03 1.04 502.58 kg
BAWAH 19 0.10 12.00 21.00 2.02 2.23 1,132.90 kg
19 0.10 12.00 19.40 2.17 2.23 1,124.30 kg
SENGKANG 13 0.15 12.00 2.67 7.52 1.04 250.65 kg
3,527.80 kg
Per m3 114.12 kg
BEKISTING Jumlah X Y H VOL
12.00 2.00 1.84 0.70 64.51 m2
Per m3 2.09 m2
BETON 30.91 m3
BESI 3,527.80 kg
BEKISTING 64.51 m2
PC4
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC4 7.00 2.00 2.00 0.80 22.40 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 7.00 14.33 3.03 1.04 316.74 kg
13 0.15 7.00 14.33 3.03 1.04 316.74 kg
BAWAH 19 0.10 7.00 21.00 2.17 2.23 709.93 kg
19 0.10 7.00 21.00 2.17 2.23 709.93 kg
SENGKANG 13 0.15 7.00 3.33 7.84 1.04 190.55 kg
2,243.90 kg
Per m3 100.17 kg
BEKISTING Jumlah X Y H VOL
7.00 2.00 2.00 0.80 44.80 m2
Per m3 2.00 m2
BETON 22.40 m3
BESI 2,243.90 kg
BEKISTING 44.80 m2
PC5L
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON PC5L 1.00 3.50 4.20 0.50 7.35 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 13 0.15 1.00 24.33 4.51 1.04 114.34 kg
13 0.15 1.00 29.00 3.81 1.04 115.12 kg
BAWAH 16 0.10 1.00 36.00 4.47 1.58 253.97 kg
16 0.10 1.00 43.00 3.77 1.58 255.85 kg
SENGKANG 13 0.15 1.00 1.33 15.24 1.04 21.17 kg
760.44 kg
Per m3 103.46 kg
BEKISTING Jumlah X Y H VOL
1.00 3.50 4.20 0.50 7.70 m2
Per m3 1.05 m2
BETON 7.35 m3
BESI 760.44 kg
BEKISTING 7.70 m2
BETON 4.16 m3
BESI 551.37 kg
BEKISTING 41.60 m2
CT SCAN
Beton Bertulang Pile Cap Jumlah X Y H VOL
BETON CT SCAN 1.00 2.00 3.00 0.25 1.50 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
ATAS 10 0.15 1.00 14.33 3.15 0.62 27.83 kg
10 0.15 1.00 21.00 2.10 0.62 27.19 kg
BAWAH 10 0.10 1.00 21.00 3.15 0.62 40.78 kg
10 0.10 1.00 31.00 2.10 0.62 40.13 kg
135.94 kg
Per m3 90.63 kg
BEKISTING Jumlah X Y H VOL
1.00 2.00 3.00 0.25 2.50 m2
Per m3 1.67 m2
BETON 1.50 m3
BESI 135.94 kg
BEKISTING 2.50 m2
- 229.52 m'
PL1 L B H V
Galian Tana 229.52 0.80 0.85 156.07 m3
Urugan Pasir 229.52 0.80 0.05 9.18 m3
Pas Batu Ko 229.52 0.80 0.20 36.72 m3
Pas Batu Kal 229.52 0.53 0.60 72.30 m3
Urugan Tanah Kembali 37.87 m3
REKAPITULASI :
Galian Tana 156.07 m3
Urugan Pasir 9.18 m3
Pas Batu Ko 36.72 m3
Pas Batu Kal 72.30 m3
Urugan Tana 37.87 m3
L B H V
Galian Tana 142.54 0.25 0.60 21.38 m3
Urugan Pasir 142.54 0.25 0.05 1.78 m3
Lantai Kerja 142.54 0.25 0.05 1.78 m3
L B H V
Galian Tana 11.40 0.20 0.50 1.14 m3
Urugan Pasir 11.40 0.20 0.05 0.11 m3
Lantai Kerja 11.40 0.20 0.05 0.11 m3
L B H V
Galian Tana 108.85 0.15 0.30 4.90 m3
Urugan Pasir 108.85 0.15 0.05 0.82 m3
Lantai Kerja 108.85 0.15 0.05 0.82 m3
REKAPITULA V
Galian Tana 27.42 m3
Urugan Pasir 2.71 m3
Lantai Kerja 2.71 m3
BETON 17.82 m3
BESI 7,121.70 kg
BEKISTING 142.54 m2
BETON 0.91 m3
BESI 284.04 kg
BEKISTING 9.12 m2
BETON 3.27 m3
BESI 397.98 kg
BEKISTING 43.54 m2
BETON 14.61 m3
PEMBESIAN 3,481.19 Kg
BEKISTING 146.08 m2
`` BETON 1.99 m3
PEMBESIAN 469.19 Kg
BEKISTING 26.56 m2
2 LANTAI 02
BETON 14.61 m3
PEMBESIAN 3,181.20 Kg
BEKISTING 146.08 m2
`` BETON 1.99 m3
PEMBESIAN 432.83 Kg
BEKISTING 26.56 m2
3 LANTAI 03
BETON 14.61 m3
PEMBESIAN 3,181.20 Kg
BEKISTING 146.08 m2
`` BETON 1.99 m3
PEMBESIAN 432.83 Kg
BEKISTING 26.56 m2
3 LANTAI Atap
`` BETON 1.68 m3
PEMBESIAN 372.82 Kg
BEKISTING 22.40 m2
1 LANTAI 02
BETON 23.21 m3
BESI 4,282.67 kg
BEKISTING 196.92 m2
BETON 3.84 m3
BESI 701.26 kg
BEKISTING 37.67 m2
BETON 5.85 m3
BESI 1,045.93 kg
BEKISTING 73.10 m2
BETON 1.66 m3
BESI 298.78 kg
BEKISTING 26.34 m2
BETON 4.03 m3
BESI 614.16 kg
BEKISTING 73.87 m2
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 149.24 kg
BEKISTING P L H V
4.00 4.00 0.12 17.92 m2
Per m3 9.33 m2
BETON 49.27 m3
BESI 9,057.82 kg
BEKISTING 459.85 m2
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 8 0.15 27.67 4.20 0.39 45.85 kg
b2 (X) 8 0.15 27.67 4.20 0.39 45.85 kg
b1 (Y) 8 0.15 27.67 4.20 0.39 45.85 kg
b2 (Y) 8 0.15 27.67 4.20 0.39 45.85 kg
183.39 kg
Per m3 114.62 kg
BEKISTING P L H V
4.00 4.00 0.10 17.60 m2
Per m3 11.00 m2
BETON 0.94 m3
BESI 153.13 kg
BEKISTING 10.34 m2
2 LANTAI 03
BETON 22.95 m3
BESI 4,229.42 kg
BEKISTING 194.75 m2
TYPE L BESI L BETON AS
B.2 4.92 4.52 4
B.2 12.86 11.99 E
B.2 11.70 11.32 E-F
BETON 3.83 m3
BESI 700.58 kg
BEKISTING 37.57 m2
BETON 4.63 m3
BESI 828.25 kg
BEKISTING 57.84 m2
BETON 1.66 m3
BESI 298.78 kg
BEKISTING 26.34 m2
TYPE L BESI L BETON AS
B.p 36.62 35.10 1-2
B.P 22.00 20.62 2-3
B.P 26.00 24.62 3-4
BETON 2.41 m3
BESI 365.95 kg
BEKISTING 44.19 m2
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 149.24 kg
BEKISTING P L H V
4.00 4.00 0.12 17.92 m2
Per m3 9.33 m2
BETON 49.27 m3
BESI 9,057.82 kg
BEKISTING 459.85 m2
BETON 21.30 m3
BESI 3,926.37 kg
BEKISTING 180.70 m2
BETON 3.84 m3
BESI 701.26 kg
BEKISTING 37.67 m2
BETON 4.65 m3
BESI 830.49 kg
BEKISTING 58.18 m2
BETON 1.37 m3
BESI 206.64 kg
BEKISTING 25.04 m2
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 149.24 kg
BEKISTING P L H V
4.00 4.00 0.12 17.92 m2
Per m3 9.33 m2
BETON 31.49 m3
BESI 5,153.05 kg
BEKISTING 293.90 m2
AN BESI Tulangan
Ʃ Tulangan Panjang Berat V
Dia Jarak
b1 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (X) 10 0.15 27.67 4.20 0.62 71.64 kg
b1 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
b2 (Y) 10 0.15 27.67 4.20 0.62 71.64 kg
286.55 kg
Per m3 179.09 kg
BEKISTING P L H V
4.00 4.00 0.10 17.60 m2
Per m3 11.00 m2
BETON 2.11 m3
BESI 486.87 kg
BEKISTING 23.23 m2
PEKERJAAN TANGGA
1 PEKERJAAN TANGGA AS 1-2/A
*) PER LANTAI (LT. DASAR - LT.ATAP)
1 - 2
2 - 3
3 - atap
BETON
Jml Luasan Lebar Vol
Anak Tangga 22.00 0.08 1.40 2.41 m3
Plat Bordes 1.00 0.15 4.20 0.63 m3
3.04 m3
PEMBESIAN
L 1.50 m'
Tulangan Berat tul
ANAK TANGGA Jumlah Ʃ Tulangan Panjang (m) V
ø Jarak (m) (kg/m)
PLAT TANGGA '+0.00 sd +2.00
anak tangga a. D10-150 10 0.15 22.00 10.00 0.87 0.62 117.32 kg
plat tangga B. D16-150 16 0.15 1.00 10.00 5.29 1.58 83.49 kg
plat tangga B. D16-151 16 0.15 1.00 10.00 8.60 1.58 135.68 kg
plat tangga C. D10-150 10 0.15 1.00 28.80 1.50 0.62 26.63 kg
plat tangga C. D10-150 10 0.15 1.00 28.80 1.50 0.62 26.63 kg
anak tangga D. 1 D10 10 - 22.00 1.00 1.50 0.62 20.34 kg
BEKISTING
+0.00 sd +2.00 jml P L VOL
bwh anak tangga 3.49 1.50 5.24 m2
depan anak tangga 22 1.42 0.18 5.62 m2
bwh bordes 2.30 2.85 6.56 m2
samping bordes 4.60 0.15 1.38 m2
samping 1.00 22.00 22.00 m2
samping 1.00 22.00 22.00 m2
+2.00 sd +4.00
bwh anak tangga 3.49 1.50 5.24 m2
depan anak tangga 11 1.42 0.18 2.81 m2
samping 1.00 22.00 22.00 m2
samping 1.00 22.00 22.00 m2
114.84 M2
PLAT TANGGA :
BETON 4.00 m3
PEMBESIAN 802.55 kg
BEKISTING 114.84 m2
*) BALOK BORDES
TYPE L BESI L BETON AS
BB 3.50 2.80 1
3.50 2.80
BALOK BORDES :
BETON 0.28 m3
PEMBESIAN 41.41 kg
BEKISTING 2.94 m2
K.BORDES 1.00 Buah H beton 2.10 m' H besi 2.70 m'
Beton Bertulang Kolom Jumlah H B B' V
BETON Kolom K6 1.00 2.10 0.25 0.30 0.16 m3
AN BESI Tulangan
Jumlah Ʃ Tulangan Panjang Berat V
Dia Jarak
TP 16 1.00 8.00 3.34 1.58 42.17 kg
Sengkang 10 0.13 1.00 17.80 0.96 0.62 10.53 kg
52.71 kg
Per m3 334.64 kg
BEKISTING Jumlah B B' L V
1.00 0.25 0.30 2.10 2.31 m2
Per m3 14.67 m2
BETON 0.16 m3
PEMBESIAN 52.71 Kg
BEKISTING 2.31 m2
2 PEKERJAAN LIFT
BETON 0.29 m3
BESI 44.75 kg
BEKISTING 3.92 m2
PEKERJAAN ATAP
*) RANGKA BAJA
URAIAN BAHAN JML L KG/M VOL
KK.1 IWF 200X100X5,5X8 3.00 13.71 21.30 876.07 kg
Plat Plendes plat 8 mm 6.00 0.08 62.80 29.84 kg
Angkur 19 MM 24.00 0.44 2.23 23.50 kg
Batang Tarik ∅ 16 MM 3.00 13.70 1.58 64.87 kg
Besi Penggantung ∅ 10 MM 15.00 2.96 0.62 27.37 kg
Gording C125X50X20X2.3 12.00 24.65 5.00 1,477.82 kg
Jarum Gording ∅ 10 mm 12.00 104.00 0.62 769.39 kg
Ikatan Angin ∅ 16 mm 8.00 19.50 1.58 246.21 kg
Perlengkapan & Aksesoris (mur baut, plat buhul, walter mur, dll) (5%) 175.75 kg
JUMLAH TOTAL = 3,690.82 kg
*) GUNUNGAN
Pas Bata 12.54 m2
Pekerjaan Beton :
Balok 24.58 m'
Kolom 5.03 m'
Plesteran 31.10 m2
Acian 31.10 m2
Pengecatan 31.10 m2
*) PENUTUP ATAP
ZINCALUME
P L VOL
24.65 12.74 314.04 m2
32 KKL 115.70
Pekerjaan Dinding L H
Pasangan Dinding 0.50 109.69 3.00
B UP TANGGA
JML AREA VOL
RAILLING TANGGA 1.00 31.64 31.64
WALL GUARD 14.39
B B UP ARS LANTAI 2
29 KKL 118.30
Pekerjaan Dinding L H
Pasangan Dinding 0.50 110.99 3.00
B UP TANGGA
JML AREA VOL
RAILLING TANGGA 1.00 31.64 31.64
WALL GUARD 48.76
C B UP ARS LANTAI 3
35 KKL 118.30
B UP TANGGA
JML AREA VOL
3 KKL 31.25
Pekerjaan Dinding L H
Pasangan Dinding 0.50 76.00 3.00
D BACK UP KUSEN :
NO TYPE KUSEN JUMLAH
LT.1 LT.2 LT.3
1 Type PU1 1.00 - -
2 Type P1 - - -
3 Type P2 - - 5.00
4 Type P3 - - 12.00
5 Type P4 - - 4.00
6 Type P5 - - 1.00
7 Type P6 - - 1.00
8 Type P.O - - 3.00
9 Type PS 11.00 11.00 11.00
10 Type AG - - 12.00
11 Type WW1 4.00 5.00 2.00
12 Type WW2 1.00 1.00 1.00
13 Type WW3 - 2.00 2.00
14 Type WW4 2.00 2.00 2.00
15 Type WW5 - 1.00 1.00
16 Type BV1 4.00 3.00 5.00
17 Type BV2 2.00 2.00 1.00
18 Type BV3 - 2.00 8.00
19 Type BV2a - - 2.00
20 Type BV3a 5.00 1.00 6.00
E BACK UP SANITAIR
B UP ARS LANTAI 1
KRAN
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG
1 R. PENGEMBANGAN LAB
2 R. GANTI
3 R. RO 2
4 LAV 1.00 1.00
5 R. RO 1
6 LAV 1.00 1.00
7 R OPERATOR
8 R. RADOIGRAFER
9 LAV 1.00 1.00
10 R MESIN
11 R. CT SCAN
12 MAMOGRAPHY
13 R PANEL
14 R. TUNGGU
15 LAV 1.00 1.00
16 A. INS RADIOLOGI
17 LAV 1.00 1.00
18 USG BACA
19 SELASAR TANGGA
20 LIFT
21 SHAFT
22 SHAFT
23 SHAFT
24 SHAFT
25 SHAFT
26 SHAFT
27 SHAFT
28 SHAFT
29 SHAFT
30 SHAFT
31 SHAFT
32 KKL
B UP ARS LANTAI 2
KRAN
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG
1 KORIDOR JENGUK 1
2 LAV 1.00 1.00
3 LAV 1.00 1.00
4 RAWAT
5 NURSE STATION
6 ICU UNFEKSIUS 1
7 ICU UNFEKSIUS 2
8 R. ANTARA
9 SELLASAR PANTRY
10 PANTRY 1.00
11 SPOEL HOEK 2.00 2.00
12 R. PERAWAT
13 LOCER
14 LAV 1.00 1.00
15 KORIDOR JENGUK TANGGA
16 R PANEL
17 LIFT
18 SHAFT
19 SHAFT
20 SHAFT
21 SHAFT
22 SHAFT
23 SHAFT
24 SHAFT
25 SHAFT
26 SHAFT
27 SHAFT
28 SHAFT
29 KKL
B UP ARS LANTAI 3
KRAN
NO NAMA RUANG FLOOR DRAIN
STANDAR PANJANG
1 OK 1
2 OK 2
3 OK 3
4 SELASAR
5 SELASAR 2
6 ALAT STERIL
7 R. PERSIAPAN
8 R. DISKUSI
9 SPOEL HOEK 1.00 1.00
10 RECOVERY ROOM
11 TRANSFER
12 R DOKTER
13 LAV 1.00 1.00
14 LOKER WANITA
15 LAV 1.00
16 LOKER GANTI PRIA
17 LAV 1.00
18 ANTARA
19 R OBAT
20 R. ONSUL
21 KORIDOR KOTOR
22 HALL TANGGA
23 R PANEL
24 LIFT
24 SHAFT
25 SHAFT
26 SHAFT
27 SHAFT
28 SHAFT
29 SHAFT
30 SHAFT
31 SHAFT
32 SHAFT
33 SHAFT
34 SHAFT
35 KKL
MEJA COUNTER
M3 PENDAFTARAN
M3
VOL
329.06 m2 263.24
54.84 m'
82.26 m'
MEJA COUNTER
M3 PENDAFTARAN
VOL
332.96 m2 266.36
55.49 m'
83.24 m'
SAT.
m'
M'
M3
VOL
1,951.80 m2
325.30 m'
487.95 m'
SAT.
m'
M3
VOL
228.00 m2
38.00 m'
57.00 m'
110.54 52.14
CLOSET WASTAFEL
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN
CLOSET WASTAFEL
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN
CLOSET WASTAFEL
HAND
JET WASHER
SHOWER DUDUK JONGKOK GANTUNG MEJA KACA CERMIN
1.00 1.00
1.00 1.00
1.00 1.00
3.00 - - 3.00 - - -
FINISHING DINDING FINISHING PLAFON
BORDER KD 30 X 60 TIMBAL PARTISI VYNIL LIST GYP GYP 9MM KALSI
49.21 108.12
12.34 6.50
81.27 23.20 27.09
5.80 16.24 6.70 2.45
81.41 22.90 27.14
5.50 15.40 6.40 2.50
43.55 52.39
10.40 6.70
6.75 2.81
10.88 5.99
119.98 25.70 39.99
68.90 20.24 22.97
13.20 7.62
51.50 81.81
5.50 15.40 6.40 2.50
16.55 16.61
6.50 18.20 7.40 3.17
17.55 18.32
26.75 32.56
7.80 m'
FINISHING DINDING FINISHING PLAFON
BORDER KD 30 X 60 TIMBAL PARTISI VYNIL LIST GYP GYP 9MM KALSI
17.40 16.66
5.00 14.00 5.90 2.16
5.00 14.00 5.90 2.16
72.00 174.35
28.56 27.85
15.55 13.80
15.55 13.80
9.48 9.21
20.05 9.71
7.10 12.78 7.90 3.51
7.00 19.60 7.90 3.51
13.66 10.66
11.18 6.77
6.40 24.98
147.97 152.43
13.20 7.62
14.47 m'
FINISHING DINDING FINISHING PLAFON
BORDER KD 30 X 60 TIMBAL PARTISI VYNIL LIST GYP GYP 9MM KALSI
84.45 28.15 48.59
77.10 25.70 40.03
77.10 25.70 40.03
42.96 51.28
30.40 32.93
25.35 22.29
21.90 28.94
13.60 10.90
6.27 11.29 7.17 3.21
21.81 27.33
16.55 11.23
12.05 7.56
5.00 14.00 5.80 1.94
9.00 5.05
5.92 16.58 6.80 2.47
8.90 4.77
4.80 13.44 5.70 1.89
14.50 7.19
8.55 4.33
12.40 9.55
82.40 53.80
45.10 56.90
13.20 7.62
- - - - - - - -
1.00
1.00 1.00
1.00 1.00
1.00 1.00
17.24
17.24 -
NISHING PLAFON
BE WP
17.24
17.24 -
NISHING PLAFON
BE WP
17.24
17.24 -
NISHING PLAFON
BE WP
38.62
38.62 -
LT. ATAP
LATIU SPONENG
- -
- -
- -
1.20 13.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
1.20 13.00
SCRUB SPOOL
PAS BOX
SINK HOEK
- - -
SCRUB SPOOL
PAS BOX
SINK HOEK
SCRUB SPOOL
PAS BOX
SINK HOEK
SCRUB SPOOL
PAS BOX
SINK HOEK
1.00