REKAP BAHAN BANGUNAN

NAMA PEKERJAAN PEMBANGUNAN RUMAH TINGGAL


OWNER BAPAK PAHALA
LOKASI BANYUWANGI-JAWA TIMUR

NO. URAIAN SAT VOLUME JUMLAH

BAHAN/MATERIAL:
1 Kayu Sengon Papan m3 0.56 0.56
2 Paku kg 25.15 25.15
3 Tanah Urug m3 92.16 92.16
4 Pasir m3 Err:509 Err:509
5 Sirtu m3 10.56 10.56
6 Batu Kali Pecah 15/20 Cm m3 Err:509 Err:509
7 Bata Merah Uk.5 X 10 X 24 bh Err:509 Err:509
8 Semen Portland zag Err:509 Err:509
9 Semen Warna kg Err:509 Err:509
10 Keramik Polos 50X50 Cm lbr Err:509 Err:509
11 Keramik Polos 25X25 Cm Unpolish lbr Err:509 Err:509
12 Keramik Motif 25x40 lbr Err:509 Err:509
13 Kayu Bekisting Meranti m3 Err:509 Err:509
14 Paku Biasa 2" - 5" Kg Err:509 Err:509
15 Minyak Bekisting liter Err:509 Err:509
16 Kawat Beton Roll Err:509 Err:509
17 Pasir Beton m3 Err:509 Err:509
18 Kerikil m3 Err:509 Err:509
19 Besi D13 btg Err:509 Err:509
20 Besi Polos 8 btg Err:509 Err:509
21 Besi Polos 10 btg 46.94 46.94
22 Dolken Kayu Gelam Dia 10cm btg Err:509 Err:509
23 Hollow 40.40.2 Mm Btg 340.97 340.97
24 Gypsumboard m² 194.84 194.84
25 Skrup Fixer kg Err:509 Err:509
26 Kawat penggantung m' 974.20 974.20
27 Profil Alluminium m' Err:509 Err:509
28 Sealant Tube Err:509 Err:509
29 Kayu Kamper Papan m3 Err:509 Err:509
30 Lem Kayu kg Err:509 Err:509
31 Kaca Tebal 5 Mm buah Err:509 Err:509
32 Handle Custom ( sepaang ) Stel 6.00 6.00
33 engsel pintu kuningan Stel Err:509 Err:509
34 engsel jendela kuningan Stel 17.00 17.00
35 grendel pintu dan jendela Stel Err:509 Err:509
36 Baja ringan canai dingin C75 Btg 527.06 527.06
37 Roof Bottom/Reng Galvalum Btg 448.00 448.00
38 Genteng Kanmuri buah 7,378.82 7,378.82
39 Genteng Bubungan Glazzur buah Err:509 Err:509
40 Woodplank ( 2x20x400) m' 77.43 77.43
41 Waterproofing Coating kg 77.43 77.43
42 Cat Tembok Dulux Weathershield Galon 1.25 1.25
43 Cat Dasar (Alkali) kg 4.98 4.98
44 Ampelas lbr 112.99 112.99
45 Rol Cat bh 0.31 0.31
46 Plamir Tembok Kg 135.38 135.38
47 Cat Tembok Dasar Kg 115.89 115.89
48 Cat Tembok Penutup (5 Kg) Galon 60.26 60.26
49 Kapi Buah 9.74 9.74
50 Cat Tembok Galon 9.35 9.35
51 Saklar Ex. Broco Buah 13.00 13.00
52 Kabel Nym 2 X 2,5 Ex. Supreme m' 97.50 97.50
53 Pipa Pralon 5/8 Batang 14.00 14.00
54 T Doos Pvc Buah 18.00 18.00
55 Fiting Plafon Buah 13.00 13.00
56 Kabel Nya 1 X 2,5 Ex. Supreme m' 75.00 75.00
57 Stop Kontak Ex. Broco Buah 5.00 5.00
58 Saklar Tunggal Ex. Broco Buah 5.00 5.00
59 Saklar Ganda Ex. Broco Buah 3.00 3.00
60 Box panel PVC isi 4 MCB Buah 1.00 1.00
61 MCB Thermis 10-16 A Buah 2.00 2.00
62 MCB Thermis 4 - 10 Amp Buah 2.00 2.00
63 Kabel NYM 3 x 2,5 mm2 m' 6.00 6.00
64 lampu Downlight LED 11W Buah 13.00 13.00
65 Socket TV Galleo Broco Buah 1.00 1.00
66 Besi Beton Kg 5.20 5.20
67 Kabel BCC 35mm m' 22.00 22.00
68 Stickrood 5/8" tembaga buah 1.00 1.00
69 Isolator + baut buah 1.00 1.00
70 Klamp buaya buah 1.00 1.00
71 Splitz 2 AIP buah 2.00 2.00
72 Pipa Galvanist batang 0.67 0.67
73 Prevectron buah 2.00 2.00
74 Kloset Duduk Merk Toto Unit 2.00 2.00
75 Jetshower Merk Toto Unit 2.00 2.00
76 Shower Spray Toto Buah 4.00 4.00
77 Bak Cuci Stainless Steel Buah 1.00 1.00
78 Water Drain + Asesories set 1.00 1.00
79 Seal Tape roll 4.00 4.00
80 Kran Air Ex. Omco Leher Angsa set 2.00 2.00
81 Kran Air Ex. Omco set 4.00 4.00
82 Floor Drain + Accessories Buah 4.00 4.00
83 Shop Holder Buah 2.00 2.00
84 Gantungan Handuk 1 susun Buah 2.00 2.00
85 Pipa Pvc Aw Ø 3/4" Batang 9.00 9.00
86 Balvalve 1/2" Buah 1.00 1.00
87 Socket Reducer 3/4"x1/2" Buah 1.00 1.00
88 Socket 1/2" Buah 9.00 9.00
89 Tee 1/2" Buah 9.00 9.00
90 Elbow 1/2" Buah 9.00 9.00
91 Pipa Pvc Aw Ø 3" Batang 4.20 4.20
92 Tee 3" Buah 5.00 5.00
93 Elbow 3" Buah 4.00 4.00
94 Socket 3" Buah 7.00 7.00
95 Pipa Pvc Aw Ø 4" Batang 6.00 6.00
96 Tee Y 4" Buah 1.00 1.00
97 Elbow Radius 4" Buah 2.00 2.00
98 Socket 4" Buah 4.00 4.00
99 Bio Septiktank 800L Buah 1.00 1.00
100 Pompa Air head 20 Buah 1.00 1.00
REKAPITULASI
NAMA PEKERJAAN : PACKING HOUSE
OWNER : BAPAK PAHALA
LOKASI : BANYUWANGI-JAWA TIMUR

JUMLAH HARGA
NO. URAIAN PEKERJAAN
(Rp)

I PEKERJAAN PERSIAPAN Rp 4,180,000.00


II PEKERJAAN TANAH Rp 13,520,864.00
III PEKERJAAN PONDASI Rp 21,036,815.28
IV PEKERJAAN PASANGAN & PLESTERAN Rp 157,378,332.20
V PEKERJAAN BETON Rp 103,543,830.19
VI PEKERJAAN PLAFOND Rp 26,278,070.80
VII PEKERJAAN KAYU DAN PARTISI KACA ( KUSEN & JENDELA ) Rp 29,676,673.00
VIII PEKERJAAN PENGGANTUNG/KUNCI/KACA Rp 1,066,880.00
IX PEKERJAAN ATAP Rp 235,399,972.49
X PEKERJAAN PENGECATAN Rp 22,062,702.30
XI PEKERJAAN INSTALASI LISTRIK Rp 9,486,840.00
XII PEKERJAAN SANITASI Rp 29,943,640.00
XIII PEKERJAAN LAIN LAIN Rp 1,000,000.00

TOTAL Rp 654,574,620.25
DIBULATKAN Rp 654,574,620.00
Terbilang :

Enam ratus lima puluh empat juta lima ratus tujuh puluh empat ribu enam ratus dua puluh rupiah
URAIAN BAHAN BANGUNAN

NAMA PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


OWNER : BAPAK PAHALA
LOKASI : BANYUWANGI-JAWA TIMUR
AN BANGUNAN
BILL OF QUALITY

NAMA PEKERJAAN : PACKING HOUSE


OWNER : PT.AGRICOLE MAKMUR INDONESIA
LOKASI : CIANJUR JAWA BARAT

HARGA SAT. JUMLAH HARGA SAT.


NO. URAIAN PEKERJAAN VOLUME SAT
UPAH UPAH

I PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
2 Pembuatan Bouwplank 80.00 m' Rp 39,750.00 Rp 3,180,000.00
JUMLAH Rp 4,180,000.00
II PEKERJAAN TANAH
1 Galian tanah untuk Pondasi Batu kali 38.40 m3 Rp 69,030.00 Rp 2,650,752.00
2 Urugan tanah kembali pondasi 76.80 m3 Rp 104,830.00 Rp 8,050,944.00
3 Urugan Sirtu padat bawah lantai 8.80 m3 Rp 114,550.00 Rp 1,008,040.00
4 Urugan pasir padat bawah keramik 5 cm 8.80 m3 Rp 205,810.00 Rp 1,811,128.00
JUMLAH Rp 13,520,864.00
III PEKERJAAN PONDASI
1 Pondasi FOOTPLAT 5.76 m3 Rp 3,652,224.88 Rp 21,036,815.28
JUMLAH Rp 21,036,815.28
IV PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan bata merah 1Pc : 5Ps 558.73 m2 Rp 95,040.00 Rp 53,101,699.20
2 Plesteran Halus 1 PC : 5 Ps 1,198.10 m2 Rp 50,740.00 Rp 60,791,594.00
3 Pekerjaan Acian 1,265.94 m2 Rp 34,350.00 Rp 43,485,039.00
JUMLAH Rp 157,378,332.20
V PEKERJAAN BETON
1 Kolom Struktural 15x45 7.09 m3 Rp 5,684,544.94 Rp 40,289,212.28
2 Balok Struktural 15x30 7.92 m3 Rp 4,499,766.61 Rp 35,638,151.57
3 Balok Struktural 15x20 1.38 m3 Rp 4,542,610.00 Rp 6,268,801.80
5 Sloof 15 x 25 6.60 m3 Rp 3,234,494.63 Rp 21,347,664.53
JUMLAH Rp 103,543,830.19
VI PEKERJAAN PLAFOND
1 Pembuatan Plafond Gypsumboard rangka Hollow 194.84 m2 Rp 134,870.00 Rp 26,278,070.80
JUMLAH Rp 26,278,070.80
VII PEKERJAAN KAYU DAN PARTISI KACA ( KUSEN & JENDELA )
1 Pintu P1 3.00 unit Rp 1,878,100.00 Rp 5,634,300.00
2 Pintu P2 3.00 unit Rp 1,706,028.00 Rp 5,118,084.00
3 Pintu PJ 4 1.00 unit Rp 5,352,610.20 Rp 5,352,610.20
4 Jendela J1 15.00 unit Rp 624,646.40 Rp 9,369,696.00
5 Jendela J2 1.00 unit Rp 1,113,214.80 Rp 1,113,214.80
6 Jendela J3 1.00 unit Rp 2,342,574.00 Rp 2,342,574.00
7 BV 1 1.00 unit Rp 251,208.40 Rp 251,208.40
8 BV 2 3.00 unit Rp 164,995.20 Rp 494,985.60
JUMLAH Rp 29,676,673.00
HARGA SAT. JUMLAH HARGA SAT.
NO. URAIAN PEKERJAAN VOLUME SAT
UPAH UPAH
VIII PEKERJAAN PENGGANTUNG/KUNCI/KACA
1 Handle Custom ( sepaang ) 6.00 Stel Rp 125,000.00 Rp 750,000.00
3 engsel jendela kuningan 4" (1 stel 3 buah engsel) 17.00 Stel Rp 18,640.00 Rp 316,880.00
JUMLAH Rp 1,066,880.00
IX PEKERJAAN ATAP
1 Pemasangan rangka atap galvalum C-75 527.06 m2 Rp 258,700.00 Rp 136,350,117.65
2 Pemasangan Atap Genteng spandek 527.06 m2 Rp 64,670.00 Rp 34,084,894.12
3 Pemasangan Papan Lisplank 2/20 Kalsiplank 77.43 m¹ Rp 45,330.00 Rp 3,509,901.90
4 Waterprofing coating 527.06 m2 Rp 116,600.00 Rp 61,455,058.82
JUMLAH Rp 235,399,972.49
X PEKERJAAN PENGECATAN
1 Pengecatan dinding eksterior 31.13 m2 Rp 65,390.00 Rp 2,035,590.70
2 Pengecatan dinding interior 1158.91 m2 Rp 13,320.00 Rp 15,436,681.20
3 Pengecatan Plafond 194.84 m2 Rp 23,560.00 Rp 4,590,430.40
JUMLAH Rp 22,062,702.30
XI PEKERJAAN INSTALASI LISTRIK
1 Pasang instalasi titik lampu NYM 2x1.5 mm2 13.00 titik Rp 277,040.00 Rp 3,601,520.00
2 Pasang instalasi titik stop kontak NYM 3X1,5 mm 5.00 titik Rp 198,840.00 Rp 994,200.00
3 Saklar tunggal 5.00 titik Rp 35,380.00 Rp 176,900.00
4 Saklar ganda 3.00 titik Rp 38,450.00 Rp 115,350.00
5 Panel box Box sekring + MCB 1.00 Unit Rp 814,220.00 Rp 814,220.00
6 Stop Kontak standart 5.00 Unit Rp 198,840.00 Rp 994,200.00
7 Pasang lampu Downlight LED 11W 13.00 Bh Rp 132,000.00 Rp 1,716,000.00
8 Socket TV 1.00 Bh Rp 32,000.00 Rp 32,000.00
9 Bak Kontrol Grounding 1.00 Bh Rp 1,042,450.00 Rp 1,042,450.00
10 Pekerjaan Pemasangan Penangkal Petir 2.00 Bh Rp 2,085,060.00 Rp 4,170,120.00
JUMLAH Rp 9,486,840.00
XII PEKERJAAN SANITASI
1 Pemasangan closet duduk 2.00 bh Rp 4,091,670.00 Rp 8,183,340.00
2 Pemasangan Jetshower WC 2.00 bh Rp 74,000.00 Rp 148,000.00
3 Pemasangan Shower Spray 4.00 bh Rp 210,000.00 Rp 840,000.00
4 Kitchen Sink Medium stainless 1.00 bh Rp 601,590.00 Rp 601,590.00
5 Pasang Kran Air dinding standart 4.00 bh Rp 294,880.00 Rp 1,179,520.00
6 Pasang Kran Air dinding leher angsa 2.00 bh Rp 69,000.00 Rp 138,000.00
7 Pemasangan Floor Drain 4.00 bh Rp 45,950.00 Rp 183,800.00
8 Soap Holder ( Sabun ) 2.00 bh Rp 30,000.00 Rp 60,000.00
9 Gantungan Handuk 2.00 bh Rp 50,000.00 Rp 100,000.00
10 Pasang saluran air bersih pipa PVC tipe AW 3/4" 45.00 m' Rp 25,220.00 Rp 1,134,900.00
11 Pasang saluran air kotor pipa PVC tipe AW 3" 21.00 m' Rp 36,290.00 Rp 762,090.00
12 Pasang saluran WC pipa PVC tipe AW 4" 30.00 m' Rp 37,940.00 Rp 1,138,200.00
13 Instalasi Jaringan Air Bersih dan air kotor 96.00 m' Rp 50,000.00 Rp 4,800,000.00
14 Pembuatan bak kontrol baru 1.00 unit Rp 6,874,200.00 Rp 6,874,200.00
15 Bio Septiktank 800L 1.00 unit Rp 2,300,000.00 Rp 2,300,000.00
16 Pompa Air head 20 1.00 unit Rp 1,500,000.00 Rp 1,500,000.00
JUMLAH Rp 29,943,640.00
XIII PEKERJAAN LAIN LAIN
1 Fitting Plumbing 1.00 Ls Rp 682,605.00 Rp 682,605.00
2 Pembersihan dan pengangkutan 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
JUMLAH Rp 1,000,000.00
JUMLAH TOTAL Rp 657,000,982.75
BACK UP VOLUME

NO. NAMA PEKERJAAN : Panjang x Lebar x Tinggi x Jumlah = Volume Sat.


I PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan : 1= 1.00 Ls
= 1.00 Ls
2 Pembuatan Bouwplank : 28 x 12 x 1x 1= 80.00 m'
= 80.00 m'

II PEKERJAAN TANAH
1 Galian tanah untuk Pondasi Batu kali
Horizontal : 0.8 x 0.8 x 2x 30 = 38.40 m3
: 0.00 x 0.8 x 2x 1= - m3

Vertikal : 0x 0.9 x 2x 1= - m3
: 0x 0.9 x 2x 1= - m3
= 38.40 m3

2 Urugan tanah kembali pondasi


Galian Pondasi : = 38.40 m3
Area Urugan Tanah : 0.8 x 0.8 x 2x 30 = 38.40 m3
= 76.80 m3
Pengurangan
Err:509 = - m3
Err:509 = 5.76 m3
Pondasi footplat = 5.76 m3
= 11.52 m3

Hasil : 76.80 - 11.52 = 65.28 m2


= 65.28 m2

Err:509 Err:509
Pond. Batu Kali : 0.00 x 0.9 x 0.1 x 1= - m3
= - m3

3 Urugan Sirtu padat bawah lantai : 176 x 0.05 x 1x 1= 8.80 m3


= 8.80 m3

4 Urugan pasir padat bawah keramik 5 cm : 176 x 0.05 x 1x 1= 8.80 m3


= 8.80 m3

III PEKERJAAN PONDASI


Err:509 Err:509 :
Horizontal : 0.8 x 0.8 x 0.3 x 30 = 5.76 m3
: 0.00 x 0.8 x 0.3 x 1= - m3

Vertikal : 0x 0.8 x 0.3 x 1= - m3


0x 0.8 x 0.3 x 1= - m3
= 5.76 m3
Err:509 Pondasi footplat
Horizontal : 0.8 x 0.8 x 0.3 x 30 = 5.76 m3
: 0.00 x 0.80 x 0.3 x 1= - m3

Vertikal : 0x 0.80 x 0.3 x 1= - m3


0x 0.80 x 0.3 x 1= - m3
= 5.76 m3

IV PEKERJAAN PASANGAN & PLESTERAN


1 Pasangan bata merah 1Pc : 5Ps
Vertikal : 176 x 3.5 x 1= 616.00 m2
:

Horizontal : 0x 3.5 x 1= - m2
: 0x 3.5 x 1= - m2
= 616.00 m2
Pengurangan
Pintu P1 : 0.9 x 2.3 x 3= 6.21 m2
Pintu P2 : 0.8 x 2.3 x 3= 5.52 m3
Jendela J1 : 0.7 x 1.8 x 10 = 12.60 m2
Jendela J2 : 1.35 x 1.8 x 1= 2.43 m2
Jendela J3 : 3.3 x 1.8 x 1= 5.94 m2
BV 1 : 0.9 x 0.5 x 1= 0.45 m2
BV 2 : 0.5 x 0.5 x 3= 0.75 m2
= 16.95 m2

Hasil : 616.00 16.95 = 599.05 m2


= 558.73 m2

Err:509 Err:509 : 10 x 2x 1= 20.00 m2


: 12 x 2x 1= 24.00 m2
Dikurangi :
Pintu P2 : 0.8 x 2.3 x 2= 3.68 m2
= 40.32 m2

2 Plesteran Halus 1 PC : 5 Ps : = 1,198.10 m2


= 1,198.10 m2

Err:509 Err:509 : 40.32 x x x 2= 80.64 m2


= 80.64 m2
3 Pekerjaan Acian : 1,198.10 80.64 = 1,278.74 m2
Dikurangi : = 12.80 m2
= 1,265.94 m2

Err:509 Err:509 :
Pintu P1 0.9 2.3 3= 33.00 m¹
Pintu P2 0.8 2.3 3= 32.40 m¹
#REF! 0 2.3 1= 9.20 m¹
#REF! 0 2.3 1= 9.20 m¹
#REF! 0 2.3 1 9.20 m¹
#REF! 0 2.3 1 9.20 m¹
Jendela J1 0.7 1.8 15 = 129.00 m¹
Jendela J2 1.35 1.8 1= 9.90 m¹
Jendela J3 0 1.8 1= 7.20 m¹
BV1 0.9 0.5 1= 5.60 m¹
BV2 0.5 0.5 3= 12.00 m¹
Roster : 0.3 x 0.4 x 70 = 196.00 m2
= 461.90 m¹

Benangan Sudut 4 x 28 = 112.00 m¹


= 112.00 m¹

Penjumlahan 461.90 + 112.00 = 573.90 m¹


= 573.90 m¹
Err:509 Err:509 : = 253.34 m2
= 238.44 m2

Err:509 Err:509 : = 14.90 m2


= 14.90 m2

Err:509 Err:509 : 6.4 x 1x 2x 1= 12.80 m2


8.55 x 1x 2x 1= 17.10 m2
= 12.80 m2

Pengurangan :
Jendela P2 : 0.8 x 2.3 x 2= 3.68 m3
= 3.68 m3

PENJUMLAHAN : 12.80 - 3.68 = 9.12 m2


= 9.12 m2

V PEKERJAAN BETON
1 Kolom Struktural 15x45
Elv +0.00 : 0.15 x 0.45 x 3.5 x 30 = 7.09 m3
= 7.09 m3

2 Balok Struktural 15x30


Elv +4.00 : 176.00 x 0.15 x 0.3 x 1= 7.92 m3
= 7.92 m3

3 Balok Struktural 15x20


Elv +4.00 : 46.00 x 0.15 x 0.2 x 1= 1.38 m3
= 1.38 m3

Err:509 Err:509 12 x 0.15 x 0.35 1= 0.63 m3


= 0.63 m3

5 Sloof 15 x 25 : 176.00 x 0.15 x 0.25 x 1= 6.60 m3


= 6.60 m3

VI PEKERJAAN PLAFOND
1 Pembuatan Plafond Gypsumboard rangka Hollow : = 194.84 m2
= 194.84 m2

VII PEKERJAAN KAYU DAN PARTISI KACA ( KUSEN & JENDELA )


Pintu P1 3= 3.00 Unit
Pintu P2 3= 3.00 Unit
Jendela J1 15 = 15.00 Unit
Jendela J2 1= 1.00 Unit
Jendela J3 1= 1.00 Unit
BV1 1= 1.00 Unit
BV2 3= 3.00 Unit

VIII PEKERJAAN PENGGANTUNG/KUNCI/KACA


1 Handle Custom Sepaang : 6= 6.00 Stel
2 Err:509 : #REF! = #REF! Stel
3 engsel jendela kuningan 4" (1 stel 3 buah engsel) : 17 = 17.00 Stel
4 Err:509 : #REF! = #REF! Stel
IX PEKERJAAN ATAP
1 Pemasanagan rangka atap galvalum C-75 : Cos 30 = 0,85
22.00 14.00 0.85 362.35
10.00 14.00 0.85 164.71
527.06 m2

2 Pemasangan Atap Genteng spandek = 527.06 m2


= 527.06 m2

Err:509 Err:509 = 89.05 m¹


= 89.05 m¹

3 Pemasangan Papan Lisplank 2/20 Kalsiplank : = 77.43 m¹


= 77.43 m¹

4 Waterprofing coating = 527.06 m2


= 527.06 m2

X PEKERJAAN PENGECATAN
1 Pengecatan dinding interior
Dinding : = 1,198.10 m2
Pengurangan
Pintu P1 : 0.9 x 2.3 x 3= 6.21 m2
Pintu P2 : 0.8 x 2.3 x 3= 5.52 m3
Pintu PJ 1 : 1x 6.25 x 0= - m2
Pintu PJ 2 : 1x 4.39 x 1= 4.39 m2
Pintu PJ 3 : 1x 5.58 x 0= - m3
Pintu PJ 4 : 1x 10.66 x 0= - m4
Jendela J1 : 1x 1.26 x 0= - m2
Jendela J2 : 1x 2.43 x 0= - m2
Jendela J3 : 1x 5.94 x 0= - m2
BV 1 : 1x 0.47 x 0= - m2
BV 2 : 1x 0.25 x 0= - m2
= 8.06 m2

Hasil : 1,198.10 - 39.19 = 1,158.91 m2


= 1,158.91 m2

2 Pengecatan dinding eksterior : 60.62 x 4.00 = 56.62 m2


= 56.62 m2
Pengurangan
Pintu P1 : 0.9 x 2.3 x 0= - m2
Pintu P2 : 0.8 x 2.3 x 0= - m2
Pintu PJ 1 : 1x 6.25 x 1= 6.25 m2
Pintu PJ 2 : 1x 4.39 x 0= - m2
Pintu PJ 3 : 1x 5.58 x 1= 5.58 m2
Pintu PJ 4 : 1x 10.66 x 1= 10.66 m2
Jendela J1 : 1x 1.26 x 15 = 18.90 m2
Jendela J2 : 1x 2.43 x 1= 2.43 m2
Jendela J3 : 1x 5.94 x 1= 5.94 m2
BV 1 : 1x 0.47 x 1= 0.47 m2
BV 2 : 1x 0.25 x 3= 0.75 m2
= 25.49 m2

Hasil : 56.62 - 25.49 = 31.13 m2

3 Pengecatan Plafond : = 194.84 m2


= 194.84 m2

XI PEKERJAAN INSTALASI LISTRIK


1 Pasang instalasi titik lampu NYM 2x1.5 mm2 : 13 = 13.00 titik
2 Pasang instalasi titik stop kontak NYM 3X1,5 mm : 5= 5.00 titik
3 Saklar tunggal : 5= 5.00 titik
4 Saklar ganda : 3= 3.00 titik
5 Panel box Box sekring + MCB : 1= 1.00 Unit
6 Stop Kontak standart : 5= 5.00 Unit
7 Pasang lampu Downlight LED 11W : 13 = 13.00 Bh
8 Socket Tv : 1= 1.00 Bh

XII PEKERJAAN SANITASI


1 Pemasangan closet duduk : 2= 2.00 bh
2 Pemasangan Jetshower WC : 2= 2.00 bh
3 Pemasangan Shower Spray : 4= 4.00 bh
4 Kitchen Sink Medium stainless : 1= 1.00 bh
5 Pasang Kran Air dinding standart : 4= 4.00 bh
6 Pasang Kran Air dinding leher angsa : 2= 2.00 bh
7 Pemasangan Floor Drain : 4= 4.00 bh
8 Soap Holder ( Sabun ) : 2= 2.00 bh
9 Gantungan Handuk : 2= 2.00 bh
10 Pasang saluran air bersih pipa PVC tipe AW 3/4" : 45 = 45.00 m'
11 Pasang saluran air kotor pipa PVC tipe AW 3" : 21 = 21.00 m'
12 Pasang saluran WC pipa PVC tipe AW 4" : 30 = 30.00 m'
13 Instalasi Jaringan Air Bersih dan air kotor : 96 = 96.00 m'
14 Pembuatan bak kontrol baru : 1= 1.00 unit
15 Bio Septiktank 800L 1= 1.00 unit
16 Pompa Air head 20 : 1= 1.00 unit
XIII PEKERJAAN LAIN LAIN
1 Fitting Plumbing
2 Pembersihan dan pengangkutan : 1= 1.00 Ls
KEBUTUHAN BAHAN BANGUNAN (MEP)
PROYEK PEMBANGUNAN RUMAH TINGGAL BANYUWANGI

Kabel Nym Kabel Nya 1 Saklar Saklar Box panel


Saklar Ex. Pipa Pralon Fiting Stop Kontak
NO URAIAN PEKERJAAN Broco
2 X 2,5 Ex.
5/8
T Doos Pvc
Plafon
X 2,5 Ex.
Ex. Broco
Tunggal Ex. Ganda Ex. PVC isi 4
Supreme Supreme Broco Broco MCB

XI PEKERJAAN INSTALASI LISTRIK


Pasang instalasi titik lampu NYM 2x1.5 mm2 13.00 97.50 13.00 13.00 13.00
Pasang instalasi titik stop kontak NYM 3X1,5 mm 1.00 5.00 75
Saklar tunggal 5.0
Saklar ganda 3.00
Panel box Box sekring + MCB 1.00
Stop Kontak standart 5.0
Pasang lampu Downlight LED 11W
Socket TV
Bak Kontrol Grounding
Pekerjaan Pemasangan Penangkal Petir
XII PEKERJAAN SANITASI
Pemasangan closet duduk
Pemasangan Jetshower WC
Pemasangan Shower Spray
Kitchen Sink Medium stainless
Pasang Kran Air dinding standart
Pasang Kran Air dinding leher angsa
Pemasangan Floor Drain
Soap Holder ( Sabun )
Gantungan Handuk
Pasang saluran air bersih pipa PVC tipe AW 3/4"
Pasang saluran air kotor pipa PVC tipe AW 3"
Pasang saluran WC pipa PVC tipe AW 4"
Pembuatan bak kontrol baru
Bio Septiktank 800L
Pompa Air head 20

SATUAN Buah m' Batang Buah Buah m' Buah Buah Buah Buah
TOTAL BAHAN 13.0 97.5 14.0 18.0 13.0 75.0 5.0 5.0 3.0 1.0
MCB MCB lampu Socket TV Stickrood
Kabel NYM Semen Kerikil Kabel BCC
Thermis 10- Thermis 4 - Downlight Galleo Batu Bata Besi Beton 5/8" Busbar
3 x 2,5 mm2 Portland Beton 35mm
16 A 10 Amp LED 11W Broco tembaga tembaga Isolator + Klamp
Pasir 250x50x8 baut buaya

2.00 2.00 6.00

13.00
1.00
70.00 1.93 0.09 0.02 2.60 22.00 1.00 1.00 1.00 1.00

70.00 1.93 0.13 0.02 2.60

Buah Buah m' Buah Buah buah zag m3 m3 Kg m' buah buah buah buah
2.0 2.0 6.0 13.0 1.0 140.0 3.9 0.2 0.0 5.2 22.0 1.0 1.0 1.0 1.0
Kloset Bak Cuci Kran Air Ex. Floor Drain Gantungan
Jetshower Shower Water Drain Kran Air Ex. Shop Pipa Pvc Aw
Splitz 2 AIP Prevectron Duduk Merk Stainless Seal Tape Omco Leher + Handuk 1
Merk Toto Spray Toto + Asesories Omco Holder Ø 3/4"
Pipa Toto Steel Angsa Accessories susun
Galvanist

2.00
0.67 2.00

2.00
2.00
4.00
1.00 1.00
4.00 4.00
2.00
4.00
2.00
2.00
9.00

buah batang buah Unit Unit Buah Buah set roll set set Buah Buah Buah Batang
2.0 0.7 2.0 2.0 2.0 4.0 1.0 1.0 4.0 2.0 4.0 4.0 2.0 2.0 9.0
Socket Bio
Balvalve Pipa Pvc Aw Pipa Pvc Aw Elbow Pompa Air
Reducer Socket 1/2" Tee 1/2" Elbow 1/2" Tee 3" Elbow 3" Socket 3" Tee Y 4" Socket 4" Septiktank
1/2" Ø 3" Ø 4" Radius 4" head 20
3/4"x1/2" 800L

1.00 1.00 9.00 9.00 9.00


4.20 5.00 4.00 7.00
6.00 1.00 2.00 4.00

1.00
1.00

Buah Buah Buah Buah Buah Batang Buah Buah Buah Batang Buah Buah Buah Unit Unit
1.0 1.0 9.0 9.0 9.0 4.2 5.0 4.0 7.0 6.0 1.0 2.0 4.0 1.0 1.0
KEBUTUHAN BAHAN BANGUNAN (ARS)
PROYEK PEMBANGUNAN RUMAH TINGGAL BANYUWANGI

Kayu Handle
Hollow Kawat Profil Kaca Tebal engsel pintu
NO URAIAN PEKERJAAN 40.40.2 Mm
Gypsumboar Skrup Fixer
penggantung Alluminium
Sealant Kamper Lem Kayu
5 Mm
Custom
kuningan
d Papan ( sepaang )

VI PEKERJAAN PLAFOND
Pembuatan Plafond Gypsumboard rangka Hollow 340.97 194.84 29.23 974.20
VII PEKERJAAN KAYU DAN PARTISI KACA
Pintu P1 0.02 16.50 0.18 6.21 1.50
Pintu P2 0.02 16.20 0.18 5.52 0.90
Pintu PJ 1 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Pintu PJ 2 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Pintu PJ 3 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Pintu PJ 4 0.01 19.60 0.06 1.36 0.30 2.72
Jendela J1 0.12 75.00 0.90 5.10 4.50 10.20
Jendela J2 0.01 8.10 0.06 0.68 0.30 1.36
Jendela J3 0.01 14.10 0.06 1.70 0.30 3.40
BV 1 0.01 2.90 0.06 0.48
BV 2 0.02 6.00 0.18 0.48
Err:509 Err:509 Err:509
VIII PEKERJAAN PENGGANTUNG/KUNCI/KACA
Accesoris 6.00 Err:509
IX PEKERJAAN ATAP
Pemasangan rangka atap galvalum C-75
Pemasangan Atap Genteng Kanmuri
Pemasangan Genteng Bubungan
Pemasangan Papan Lisplank 2/20 Kalsiplank
Waterprofing coating
X PEKERJAAN PENGECATAN
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan Plafond

SATUAN Btg m² kg m' m' Tube m3 kg buah Stel Stel


TOTAL BAHAN 341.0 194.8 Err:509 974.2 Err:509 Err:509 Err:509 Err:509 Err:509 6.0 Err:509
engsel grendel Baja ringan Roof Genteng
Genteng Semen Pasir Woodplank
NO URAIAN PEKERJAAN jendela pintu dan canai dingin Bottom/Ren
Kanmuri
Paku Biasa
Portland Pasang
Bubungan
( 2x20x400)
kuningan jendela C75 g Galvalum Glazzur

VI PEKERJAAN PLAFOND
Pembuatan Plafond Gypsumboard rangka Hollow
VII PEKERJAAN KAYU DAN PARTISI KACA
Pintu P1
Pintu P2
Pintu PJ 1
Pintu PJ 2
Pintu PJ 3
Pintu PJ 4
Jendela J1
Jendela J2
Jendela J3
BV 1
BV 2
Err:509
VIII PEKERJAAN PENGGANTUNG/KUNCI/KACA
Accesoris 17.00 Err:509
IX PEKERJAAN ATAP
Pemasangan rangka atap galvalum C-75 527.06 448.00
Pemasangan Atap Genteng Kanmuri 7,378.82 15.81
Pemasangan Genteng Bubungan Err:509 Err:509 Err:509
Pemasangan Papan Lisplank 2/20 Kalsiplank 7.74 77.43
Waterprofing coating
X PEKERJAAN PENGECATAN
Pengecatan dinding eksterior
Pengecatan dinding interior
Pengecatan Plafond

SATUAN Stel Stel Btg Btg buah kg zag m3 buah m'


TOTAL BAHAN 17.0 Err:509 527.1 448.0 7,378.8 23.6 Err:509 Err:509 Err:509 77.4
Cat Tembok
Cat Tembok
Dulux Cat Dasar Plamir Cat Tembok
NO URAIAN PEKERJAAN Waterproofi
Weathershie (Alkali)
Ampelas Rol Cat
Tembok Dasar
Penutup (5 Kapi Cat Tembok
ng Coating Kg)
ld

VI PEKERJAAN PLAFOND
Pembuatan Plafond Gypsumboard rangka Hollow
VII PEKERJAAN KAYU DAN PARTISI KACA
Pintu P1
Pintu P2
Pintu PJ 1
Pintu PJ 2
Pintu PJ 3
Pintu PJ 4
Jendela J1
Jendela J2
Jendela J3
BV 1
BV 2
Err:509
VIII PEKERJAAN PENGGANTUNG/KUNCI/KACA
Accesoris
IX PEKERJAAN ATAP
Pemasangan rangka atap galvalum C-75
Pemasangan Atap Genteng Kanmuri
Pemasangan Genteng Bubungan
Pemasangan Papan Lisplank 2/20 Kalsiplank
Waterprofing coating 527.06
X PEKERJAAN PENGECATAN
Pengecatan dinding eksterior 1.25 4.98 15.57 0.31
Pengecatan dinding interior 115.89 115.89 60.26
Pengecatan Plafond 97.42 19.48 9.74 9.35

SATUAN kg Galon kg lbr bh Kg Kg Galon Buah Galon


TOTAL BAHAN 527.1 1.2 5.0 113.0 0.3 135.4 115.9 60.3 9.7 9.4
KEBUTUHAN BAHAN BANGUNAN (STR)
PROYEK PEMBANGUNAN RUMAH TINGGAL BANYUWANGI

Kayu Batu Kali Bata Merah Keramik Keramik


Semen Semen
NO URAIAN PEKERJAAN Sengon Paku Tanah Urug Pasir Sirtu Pecah 15/20 Uk.5 X 10 X
Portland Warna
Polos 50X50 Polos 25X25
Papan Cm 24 Cm Cm Unpolish

I PEKERJAAN PERSIAPAN
Pembuatan Bouwplank 0.56 1.60
II PEKERJAAN TANAH
Urugan tanah kembali pondasi 92.16
Err:509 Err:509
Urugan Sirtu padat bawah lantai 10.56
Urugan pasir padat bawah keramik 5 cm 10.56
III PEKERJAAN PONDASI
Err:509 Err:509 Err:509
Pondasi FOOTPLAT 2.79 7 23.27
IV PEKERJAAN PASANGAN & PLESTERAN
Pasangan bata merah 1Pc : 5Ps 25.14 46,374.59 135.21
Err:509 Err:509 Err:509 Err:509
Plesteran Halus 1 PC : 5 Ps 31.15 155.27
Err:509 Err:509 Err:509
Pekerjaan Acian 102.92
Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
V PEKERJAAN BETON
Kolom Struktural 15x20 59.54
Kolom Struktural 15x35 Err:509
Balok Struktural 15x20 66.53
Balok Struktural 15x35 11.59
Balok Kantiliver 15x35 Err:509
Sloof 15 x 20 55.44
Plat kanopi beton Err:509

SATUAN m3 kg m3 m3 m3 m3 bh zag kg lbr lbr


TOTAL BAHAN 0.6 1.6 92.2 Err:509 10.6 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Kayu Dolken
Keramik Paku Biasa Minyak Kawat Besi Polos
NO URAIAN PEKERJAAN Motif 25x40
Bekisting
2" - 5" Bekisting Beton
Kerikil Besi D13 Besi Polos 8
10
Kayu Gelam
Meranti Dia 10cm
Pasir Beton

I PEKERJAAN PERSIAPAN
Pembuatan Bouwplank
II PEKERJAAN TANAH
Urugan tanah kembali pondasi
Err:509
Urugan Sirtu padat bawah lantai
Urugan pasir padat bawah keramik 5 cm
III PEKERJAAN PONDASI
Err:509
Pondasi FOOTPLAT
IV PEKERJAAN PASANGAN & PLESTERAN
Pasangan bata merah 1Pc : 5Ps
Err:509
Plesteran Halus 1 PC : 5 Ps
Err:509
Pekerjaan Acian
Err:509
Err:509
Err:509
Err:509 Err:509
V PEKERJAAN BETON
Kolom Struktural 15x20 2.84 28.35 14.18 1.28 5.74 5.74 118.15 69.54
Kolom Struktural 15x35 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Balok Struktural 15x20 2.53 25.34 12.67 0.95 4.28 6.42 88.02 77.71 126.72
Balok Struktural 15x35 22.08 4.42 2.21 0.37 1.79 0.38 15.34 13.61 4.42
Balok Kantiliver 15x35 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Sloof 15 x 20 1.78 13.20 3.96 0.79 3.56 5.35 73.35 46.94
Plat kanopi beton Err:509 Err:509 Err:509 Err:509 Err:509

SATUAN lbr m3 Kg liter Roll m3 m3 btg btg btg btg


TOTAL BAHAN Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 46.9 Err:509
NO. NAMA PEKERJAAN : Panjang x Lebar x Tinggi x

1 Kolom Struktural 15x45


Beton :
D13 33.33 x 1 x 1.041885 x
Ø8 0.6 x 1 x 0.39456 x
Ø8 0.6 x 1 x 0.39456 x

Begesting : 0.7 x 1 x 33.33 x


Bongkar Begesting :

2 Err:509
Beton :
D13 19.05 x 1 x 1.041885 x
Ø8 0.9 x 1 x 0.39456 x
Ø8 0.9 x 1 x 0.39456 x

Begesting : 1 x 1 x 19.05 x
Bongkar Begesting :

`
2 Balok Struktural 15x30
Beton :
D13 33.33 x 1 x 1.041885 x
Ø8 0.6 x 1 x 0.39456 x
Ø8 0.6 x 1 x 0.39456 x

Begesting : 0.55 x 1 x 33.33 x


Bongkar Begesting :

3 Balok Struktural 15x20


Beton :
D13 22.22 x 1 x 1.041885 x
Ø8 0.9 x 1 x 0.39456 x
Ø8 0.9 x 1 x 0.39456 x

Begesting : 0.85 x 1 x 22.22 x


Bongkar Begesting :

### Err:509
Beton :
D13 19.05 x 1 x 1.041885 x
Ø8 0.9 x 1 x 0.39456 x
Ø8 0.9 x 1 x 0.39456 x

Begesting : 0.85 x 1 x 19.05 x


Bongkar Begesting :

6 sloof 15x20 Beton:


D13 33.33 x 1 x 1.041885 x
Ø10 0.6 x 1 x 0.39456 x

Begesting 0.4 x 1 x 33.33 x


Bongkar Begesting :

1 footplat
P1
Beton
Ø12 25.2 x 1 x 0.88776 x
0.8 x 0.8 x 0.3 x

Begesting : 3.2 x 1 x 0.3 x

Bongkar Begesting
Jumlah = Volume Sat.

= 1 m1 Rp 977,690.00 Rp 977,690.00
6 = 208.377 16.67016
112.11 = 26.54074 5.59931139240506
84.33 = 19.96474
= 254.8825 kg Rp 11,870.00 Rp 3,025,454.94

1 = 23.33 m2 Rp 60,050.00 Rp 1,401,166.67


= 23.33 m2 Rp 12,010.00 Rp 280,233.33
Rp 5,684,544.94

= 1 m1 Rp 977,690.00 Rp 977,690.00
12 = 238.1451
64.49 = 22.90139
48.62 = 17.26482
= 278.3114 kg Rp 11,870.00 Rp 3,303,555.73

1 = 19.05 m2 Rp 60,050.00 Rp 1,143,809.52


= 19.05 m2 Rp 12,010.00 Rp 228,761.90
Rp 5,653,817.16

= 1 m1 Rp 977,690.00 Rp 977,690.00
4 = 138.918
112.11 = 26.54074
84.33 = 19.96474
= 185.4235 kg Rp 11,870.00 Rp 2,200,976.61

1 = 18.33 m2 Rp 60,050.00 Rp 1,100,916.67


= 18.33 m2 Rp 12,010.00 Rp 220,183.33
Rp 4,499,766.61

= 1 m1 Rp 977,690.00 Rp 977,690.00
6 = 138.918
75.07 = 26.6591
56.56 = 20.0831
= 185.6602 kg Rp 11,870.00 Rp 2,203,786.67

1 = 18.89 m2 Rp 60,050.00 Rp 1,134,277.78


= 18.89 m2 Rp 12,010.00 Rp 226,855.56
Rp 4,542,610.00

= 1 m1 Rp 977,690.00 Rp 977,690.00
8 = 158.7634
64.49 = 22.90139
48.62 = 17.26482
= 198.9296 kg Rp 11,870.00 Rp 2,361,294.79

1 = 16.19 m2 Rp 60,050.00 Rp 972,238.10


= 16.19 m2 Rp 12,010.00 Rp 194,447.62
Rp 4,505,670.50

= 33.33333 m1
4 = 138.918
222.322222222 = 52.63167
= 191.5497 kg Rp 11,870.00 Rp 2,273,694.63

1 = 13.33333 m2 Rp 60,050.00 Rp 800,666.67


= 13.33 m2 Rp 12,010.00 Rp 160,133.33
Rp 3,234,494.63

= 1 m3 1,340,240.00 Rp 1,340,240.00
1 = 22.37155 kg
1 = 0.192
5.208333
116.5185 kg 16,750.00 Rp 1,951,684.88
1 = 0.96 m2
= 5.00 m2 60,050.00 Rp 300,250.00
= 5.00 m2 12,010.00 Rp 60,050.00
Rp 3,652,224.88
HARGA SATUAN POKOK KEGIATAN (HSPK)
TAHUN 2020

KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN


2.01 HSPK FISIK KONSTRUKSI
2.01.01 BANGUNAN GEDUNG
2.01.01.01 A. PEKERJAAN PERSIAPAN & TANAH
2.01.01.01.01 Pekerjaan Persiapan
Nilai HSPK
2.01.01.01.01.004 1 m' Pengukuran Dan Pemasangan Bowplank m' 39,750.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 110,000.00 550.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.1000 O.H 80,000.00 8,000.00
1.01.02.13.027 Kayu Sengon Papan 0.0070 m3 787,500.00 5,512.50
1.01.02.13.028 Kayu Sengon 5/7 0.0120 m3 1,285,714.29 15,428.57
1.01.02.07.072 Paku Biasa 2" - 5" 0.0200 Kg 15,300.00 306.00

1 m2 Pekerjaan Pembersihan Lapangan Dan Nilai HSPK


2.01.01.01.01.009 m2 13,500.00
Perataan (Dibulatkan):
1.01.01.01.001 Mandor 0.0500 O.H 110,000.00 5,500.00
1.01.01.02.023 Pekerja 0.1000 O.H 80,000.00 8,000.00

2.01.01.01.02 Pekerjaan Tanah


1 m3 Pekerjaan Galian Tanah Biasa Sedalam 1 Nilai HSPK
2.01.01.01.02.001 m3 69,030.00
Meter (Dibulatkan):
1.01.01.01.001 Mandor 0.0250 O.H 110,000.00 2,750.00
1.01.01.02.023 Pekerja 0.7500 O.H 80,000.00 60,000.00
OVERHEAD + PROFIT 10% 6,275.00

Nilai HSPK
2.01.01.01.02.013 1 m3 Pekerjaan Pengurugan Pasir Urug m3 205,810.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0100 O.H 110,000.00 1,100.00
1.01.01.02.023 Pekerja 0.3000 O.H 80,000.00 24,000.00
1.01.02.01.008 Pasir Urug 1.2000 m3 135,000.00 162,000.00
OVERHEAD + PROFIT 10% 18,710.00

Nilai HSPK
2.01.01.01.02.014 1 m3 Pengurugan Sirtu Padat m3 114,550.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0250 O.H 110,000.00 2,750.00
1.01.01.02.023 Pekerja 0.2500 O.H 80,000.00 20,000.00
1.01.02.01.009 Sirtu 1.2000 m3 76,500.00 91,800.00

Nilai HSPK
2.01.01.01.02.015 1 m3 Pekerjaan Pengurugan Dengan Tanah Urug m3 104,830.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0100 O.H 110,000.00 1,100.00
1.01.01.02.023 Pekerja 0.3000 O.H 80,000.00 24,000.00
1.01.02.01.012 Tanah Urug 1.2000 m3 58,500.00 70,200.00
OVERHEAD + PROFIT 10% 9,530.00

2.01.01.02 B. PEKERJAAN PONDASI


2.01.01.02.01 Pondasi
1 m3 Pekerjaan Pasangan Pondasi Batu Belah 15/20 Nilai HSPK
2.01.01.02.01.001 m3 473,340.00
Cm, Campuran (1 Pc : 5 Pp) (Dibulatkan):
1.01.01.01.001 Mandor 0.0750 O.H 110,000.00 8,250.00
1.01.01.01.002 Kepala Tukang 0.0750 O.H 95,000.00 7,125.00
1.01.01.02.001 Tukang Batu 0.7500 O.H 90,000.00 67,500.00
1.01.01.02.023 Pekerja 1.5000 O.H 80,000.00 120,000.00
1.01.02.03.001 Semen Portland 4.0400 Zag 1,282.50 5,181.30
1.01.02.01.006 Pasir Pasang 0.4850 m3 135,000.00 65,475.00
1.01.02.01.016 Batu Kali Pecah 15/20 Cm 1.2000 m3 166,500.00 199,800.00

1 m3 Pekerjaan Pemasangan Batu Kosong Nilai HSPK


2.01.01.02.01.009 m3 363,620.00
(Aanstamping) (Dibulatkan):
1.01.01.01.001 Mandor 0.0390 O.H 110,000.00 4,290.00
1.01.01.01.002 Kepala Tukang 0.0390 O.H 95,000.00 3,705.00
1.01.01.02.001 Tukang Batu 0.3900 O.H 90,000.00 35,100.00
1.01.01.02.023 Pekerja 0.7800 O.H 80,000.00 62,400.00
1.01.02.01.016 Batu Kali Pecah 15/20 Cm 1.2000 m3 166,500.00 199,800.00
1.01.02.01.006 Pasir 0.4320 m3 135,000.00 58,320.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
2.01.01.03 C. STRUKTUR UTAMA
2.01.01.03.01 Pekerjaan Beton
Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225), Nilai HSPK
2.01.01.03.01.007 m3 1,014,540.00
Slump (12+/-2) Cm, W/C = 0,58 (Dibulatkan):
1.01.01.01.001 Mandor 0.0830 O.H 110,000.00 9,130.00
1.01.01.01.002 Kepala Tukang 0.0280 O.H 95,000.00 2,660.00
1.01.01.01.002 Tukang Batu 0.2750 O.H 90,000.00 24,750.00
1.01.01.02.023 Pekerja 1.6500 O.H 80,000.00 132,000.00
1.01.02.03.001 Semen Portland 371.0000 Kg 1,282.50 475,807.50
1.01.02.01.004 Pasir Beton 0.4986 m3 166,500.00 83,016.90
1.01.02.01.020 Kerikil 0.7755 m3 189,000.00 146,569.50
1.01.02.06.024 Air Tawar 215.0000 Liter 225.00 48,375.00

Nilai HSPK
2.01.01.03.01.013 1 Kg Pekerjaan Pembesian Dengan Besi Polos Kg 12,360.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0004 O.H 110,000.00 44.00
1.01.01.01.002 Kepala Tukang 0.0007 O.H 95,000.00 66.50
1.01.01.02.002 Tukang Besi 0.0070 O.H 90,000.00 630.00
1.01.01.02.023 Pekerja 0.0070 O.H 80,000.00 560.00
1.01.02.07.001 Besi Beton Polos 1.0500 Kg 9,450.00 9,922.50
1.01.02.07.129 Kawat Beton 0.0006 Kg 11,700.00 7.02
OVERHEAD + PROFIT 10% 1,123.00

Nilai HSPK
2.01.01.03.01.014 1 Kg Pekerjaan Pembesian Dengan Besi Ulir Kg 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0004 O.H 95,000.00 38.00
1.01.01.01.002 Kepala Tukang 0.0007 O.H 85,000.00 59.50
1.01.01.02.002 Tukang Besi 0.0070 O.H 75,000.00 525.00
1.01.01.02.023 Pekerja 0.0070 O.H 70,000.00 490.00
1.01.02.07.002 Besi Beton Ulir 1.0500 Kg 11,000.00 11,550.00
1.01.02.07.129 Kawat Beton 0.0006 Kg 22,000.00 13.20

1 Kg Pekerjaan Pemasangan Wiremesh (Jaring Nilai HSPK


2.01.01.03.01.015 Kg 0.00
Kawat Baja) (Dibulatkan):
1.01.01.01.001 Mandor 0.0010 O.H. 95,000.00 95.00
1.01.01.01.002 Kepala Tukang 0.0020 O.H. 85,000.00 170.00
1.01.01.02.002 Tukang Besi 0.0250 O.H. 75,000.00 1,875.00
1.01.01.02.023 Pekerja 0.0250 O.H. 70,000.00 1,750.00
1.01.02.07.099 Jaring Kawat Baja 1.0200 kg 32,849.00 33,505.98
1.01.02.07.129 Kawat Beton 0.0020 kg 22,000.00 44.00

10 kg Pemasangan kabel prategang (prestressed)


2.01.01.03.01.016 kg 0.00
polos/strands
1.01.01.01.001 Mandor 0.0030 O.H. 95,000.00 285.00
1.01.01.01.002 Kepala Tukang 0.0050 O.H. 85,000.00 425.00
1.01.01.02.002 Tukang Besi 0.0500 O.H. 75,000.00 3,750.00
1.01.01.02.023 Pekerja 0.0500 O.H. 70,000.00 3,500.00
1.01.02.07.001 Besi Beton Polos 10.5000 kg 10,000.00 105,000.00
1.01.02.07.129 Kawat Beton 0.1000 kg 22,000.00 2,200.00

1 m3 Membuat Pondasi Beton Bertulang (150 Kg Nilai HSPK


2.01.01.03.01.017 m3 0.00
Besi+Bekisting) (Dibulatkan):
1.01.01.01.001 Mandor 0.2650 O.H 95,000.00 25,175.00
1.01.01.01.002 Kepala Tukang 0.2620 O.H 85,000.00 22,270.00
1.01.01.02.002 Tukang Besi 1.0500 O.H 75,000.00 78,750.00
1.01.01.02.004 Tukang Kayu 1.3000 O.H 75,000.00 97,500.00
1.01.01.01.002 Tukang Batu 0.2750 O.H 85,000.00 23,375.00
1.01.01.02.023 Pekerja 5.3000 O.H 70,000.00 371,000.00
1.01.02.13.031 Kayu Bekisting Meranti 0.2000 m3 2,407,500.00 481,500.00
1.01.02.07.072 Paku Biasa 2" - 5" 1.5000 Kg 18,000.00 27,000.00
1.01.02.06.086 Minyak Bekisting 0.4000 liter 9,630.00 3,852.00
1.01.02.07.001 Besi Beton Polos 157.5000 Kg 10,000.00 1,575,000.00
1.01.02.07.129 Kawat Beton 0.0900 Roll 22,000.00 1,980.00
1.01.02.03.001 Semen Portland 336.0000 kg 1,225.00 411,600.00
1.01.02.01.004 Pasir Beton 0.5400 m3 292,698.50 158,057.19
1.01.02.01.020 Kerikil 0.8100 m3 359,252.50 290,994.53

1 m3 Membuat Sloof Beton Bertulang (200 Kg Nilai HSPK


2.01.01.03.01.018 m3 4,374,140.00
Besi+Bekisting) (Dibulatkan):
1.01.01.01.001 Mandor 0.2830 O.H 110,000.00 31,130.00
1.01.01.01.002 Kepala Tukang 0.3230 O.H 95,000.00 30,685.00
1.01.01.02.002 Tukang Besi 1.4000 O.H 90,000.00 126,000.00
1.01.01.02.004 Tukang Kayu 1.5600 O.H 90,000.00 140,400.00
1.01.01.01.002 Tukang Batu 0.2750 O.H 90,000.00 24,750.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.02.023 Pekerja 5.6500 O.H 80,000.00 452,000.00
1.01.02.13.031 Kayu Bekisting Meranti 0.2700 m3 3,240,000.00 874,800.00
1.01.02.07.072 Paku Biasa 2" - 5" 2.0000 Kg 15,300.00 30,600.00
1.01.02.06.086 Minyak Bekisting 0.6000 liter 6,570.00 3,942.00
1.01.02.07.001 Besi Beton Polos 210.0000 Kg 9,450.00 1,984,500.00
1.01.02.07.129 Kawat Beton 0.1200 Roll 11,700.00 1,404.00
1.01.02.03.001 Semen Portland 336.0000 kg 1,282.50 430,920.00
1.01.02.01.004 Pasir Beton 0.5400 m3 166,500.00 89,910.00
1.01.02.01.020 Kerikil 0.8100 m3 189,000.00 153,090.00

1 m3 Membuat Kolom Beton Bertulang (300 Kg Nilai HSPK


2.01.01.03.01.019 m3 7,119,790.00
Besi+Bekisting) (Dibulatkan):
1.01.01.01.001 Mandor 0.3530 O.H 95,000.00 33,535.00
1.01.01.01.002 Kepala Tukang 0.4030 O.H 85,000.00 34,255.00
1.01.01.02.002 Tukang Besi 2.1000 O.H 75,000.00 157,500.00
1.01.01.02.004 Tukang Kayu 1.6500 O.H 75,000.00 123,750.00
1.01.01.01.002 Tukang Batu 0.2750 O.H 85,000.00 23,375.00
1.01.01.02.023 Pekerja 7.0500 O.H 70,000.00 493,500.00
1.01.02.13.031 Kayu Bekisting Meranti 0.4000 m3 2,407,500.00 963,000.00
1.01.02.07.072 Paku Biasa 2" - 5" 4.0000 Kg 18,000.00 72,000.00
1.01.02.06.086 Minyak Bekisting 2.0000 liter 9,630.00 19,260.00
1.01.02.07.001 Besi Beton Polos 315.0000 Kg 10,000.00 3,150,000.00
1.01.02.07.129 Kawat Beton 0.1800 Roll 22,000.00 3,960.00
1.01.02.03.001 Semen Portland 336.0000 Kg 1,225.00 411,600.00
1.01.02.01.004 Pasir Beton 0.5400 m3 292,698.50 158,057.19
1.01.02.01.020 Kerikil 0.8100 m3 359,252.50 290,994.53
1.01.02.13.024 Kayu Meranti Balok 0.1500 m3 2,700,000.00 405,000.00
1.01.02.14.013 Multipleks 9 Mm 3.5000 Lembar 120,000.00 420,000.00
1.01.02.13.033 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 20.0000 Batang 18,000.00 360,000.00

1 m3 Membuat Balok Beton Bertulang (200 Kg Nilai HSPK


2.01.01.03.01.020 m3 0.00
Besi+Bekisting) (Dibulatkan):
1.01.01.01.001 Mandor 0.3180 O.H 95,000.00 30,210.00
1.01.01.01.002 Kepala Tukang 0.3330 O.H 85,000.00 28,305.00
1.01.01.02.002 Tukang Besi 1.4000 O.H 75,000.00 105,000.00
1.01.01.02.004 Tukang Kayu 1.6500 O.H 75,000.00 123,750.00
1.01.01.01.002 Tukang Batu 0.2750 O.H 85,000.00 23,375.00
1.01.01.02.023 Pekerja 6.3500 O.H 70,000.00 444,500.00
1.01.02.13.031 Kayu Bekisting Meranti 0.3200 m3 2,407,500.00 770,400.00
1.01.02.07.072 Paku Biasa 2" - 5" 3.2000 Kg 18,000.00 57,600.00
1.01.02.06.086 Minyak Bekisting 1.6000 liter 9,630.00 15,408.00
1.01.02.07.001 Besi Beton Polos 210.0000 Kg 10,000.00 2,100,000.00
1.01.02.07.129 Kawat Beton 0.1200 Roll 22,000.00 2,640.00
1.01.02.03.001 Semen Portland 336.0000 Kg 1,225.00 411,600.00
1.01.02.01.004 Pasir Beton 0.5400 m3 292,698.50 158,057.19
1.01.02.01.020 Kerikil 0.8100 m3 359,252.50 290,994.53
1.01.02.13.024 Kayu Meranti Balok 0.1400 m3 2,700,000.00 378,000.00
1.01.02.14.013 Multipleks 9 Mm 2.8000 Lembar 120,000.00 336,000.00
1.01.02.13.033 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 16.0000 Batang 18,000.00 288,000.00

1 m3 Membuat Plat Beton Bertulang (150 Kg Nilai HSPK


2.01.01.03.01.021 m3 4,678,500.00
Besi+Bekisting) (Dibulatkan):
1.01.01.01.001 Mandor 0.2650 O.H 110,000.00 29,150.00
1.01.01.01.002 Kepala Tukang 0.2650 O.H 95,000.00 25,175.00
1.01.01.02.002 Tukang Besi 1.0500 O.H 90,000.00 94,500.00
1.01.01.02.004 Tukang Kayu 1.3000 O.H 90,000.00 117,000.00
1.01.01.01.002 Tukang Batu 0.2750 O.H 90,000.00 24,750.00
1.01.01.02.023 Pekerja 5.3000 O.H 80,000.00 424,000.00
1.01.02.13.031 Kayu Bekisting Meranti 0.3200 m3 3,240,000.00 1,036,800.00
1.01.02.07.072 Paku Biasa 2" - 5" 3.2000 Kg 15,300.00 48,960.00
1.01.02.06.086 Minyak Bekisting 1.6000 liter 6,570.00 10,512.00
1.01.02.07.001 Besi Beton Polos 157.5000 Kg 9,450.00 1,488,375.00
1.01.02.07.129 Kawat Beton 0.0900 Roll 11,700.00 1,053.00
1.01.02.03.001 Semen Portland 336.0000 kg 1,282.50 430,920.00
1.01.02.01.004 Pasir Beton 0.5400 m3 166,500.00 89,910.00
1.01.02.01.020 Kerikil 0.8100 m3 189,000.00 153,090.00
1.01.02.13.024 Kayu Meranti Balok 0.1200 m3 3,240,000.00 388,800.00
1.01.02.14.013 Multipleks 9 Mm 2.8000 Lembar 112,680.00 315,504.00
1.01.02.13.033 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 32.0000 Batang 0.00 0.00

1 m3 Membuat Plat Beton Bertulang Kanopi (150 Kg Nilai HSPK


m3 1,431,820.00
Besi+Bekisting) (Dibulatkan):
Mandor 0.2650 O.H 110,000.00 29,150.00
Kepala Tukang 0.2650 O.H 95,000.00 25,175.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
Tukang Besi 1.0500 O.H 90,000.00 94,500.00
Tukang Batu 0.2750 O.H 90,000.00 24,750.00
Pekerja 5.3000 O.H 80,000.00 424,000.00
Kayu Bekisting Meranti 0.1000 m3 3,240,000.00 324,000.00
Paku Biasa 2" - 5" 1.9400 Kg 22,000.00 42,680.00
Besi Beton Polos 1.9400 Kg 9,450.00 18,333.00
Semen Portland 268.8 kg 1,282.50 344,736.00
Pasir Beton 0.5400 m3 166,500.00 89,910.00
Kerikil 0.8100 m3 18,000.00 14,580.00

1 m2 Pekerjaan Pasang Bekisting Untuk Lantai (3 Nilai HSPK


2.01.01.03.02.019 m2 136,890.00
Kali Pakai) (Dibulatkan):
1.01.01.01.001 Mandor 0.0110 O.H 95,000.00 1,045.00
1.01.01.01.002 Kepala Tukang 0.0110 O.H 85,000.00 935.00
1.01.01.02.004 Tukang Kayu 0.1100 O.H 75,000.00 8,250.00
1.01.01.02.023 Pekerja 0.2200 O.H 70,000.00 15,400.00
1.01.02.13.031 Kayu Bekisting Meranti 0.0134 m3 2,407,500.00 32,260.50
1.01.02.07.072 Paku Biasa 2" - 5" 0.1334 Kg 18,000.00 2,401.20
1.01.02.06.086 Minyak Bekisting 0.0667 liter 9,630.00 642.32
1.01.02.13.024 Balok Kayu Meranti 0.0050 m3 2,700,000.00 13,500.00
1.01.02.14.013 Multipleks 9 Mm 0.1167 Lembar 120,000.00 14,004.00
1.01.02.13.033 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 2.0000 Batang 18,000.00 36,000.00
OVERHEAD + PROFIT 10% 12,443.80

Pekerjaan Pondasi Footplat 1 m3


Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225) 1.00 m3 1,014,540.00 1,014,540.00
Pembesian 19.96 kg 12,360.00 246,764.14
Bekisting 23.33 m2 60,050.00 1,401,166.67
Bongkar bekisting 23.33 m2 12,010.00 280,233.33
2,942,704.14

Pekerjaan Kolom 15x15 1 m3


Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225) 1.00 m3 1,014,540.00 1,014,540.00
Pembesian = kg 12,360.00 #VALUE!
Bekisting = m2 60,050.00 #VALUE!
Bongkar bekisting = m2 12,010.00 #VALUE!
#VALUE!

Pekerjaan Kolom struktur 15x30 1m3


Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225) 1.00 m3 1,014,540.00 1,014,540.00
Pembesian #NAME? kg 12,360.00 #NAME?
Bekisting #NAME? m2 60,050.00 #NAME?
Bongkar bekisting #NAME? m2 12,010.00 #NAME?
#NAME?

Pekerjaan Balok Struktur 15x30 1m3


Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225) 1.00 m3 1,014,540.00 1,014,540.00
Pembesian #NAME? kg 12,360.00 #NAME?
Bekisting #NAME? m2 60,050.00 #NAME?
Bongkar bekisting #NAME? m2 12,010.00 #NAME?
#NAME?

Pekerjaan Balok Latai 15x15 1m3


Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225) 1.00 m3 1,014,540.00 1,014,540.00
Pembesian #NAME? kg 12,360.00 #NAME?
Bekisting #NAME? m2 60,050.00 #NAME?
Bongkar bekisting #NAME? m2 12,010.00 #NAME?
#NAME?

Pekerjaan Sloof 15x30 1m3


Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225) 1.00 m3 1,014,540.00 1,014,540.00
Pembesian 191.55 kg 12,360.00 2,367,553.97
Bekisting 13.33 m2 60,050.00 800,666.67
Bongkar bekisting 13.33 m2 12,010.00 160,133.33
4,342,893.97

Pekerjaan Pilar 15x35 1m3


Membuat 1 m3 Beton Mutu F’C = 19,3 Mpa (K 225) 1.00 m3 1,014,540.00 1,014,540.00
Pembesian #NAME? kg 12,360.00 #NAME?
Bekisting #NAME? m2 60,050.00 #NAME?
Bongkar bekisting #NAME? m2 12,010.00 #NAME?
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
#NAME?
1 m2 Pekerjaan Pasang Bekisting Untuk Dinding (3 Nilai HSPK
2.01.01.03.02.020 m2 0.00
Kali Pakai) (Dibulatkan):
1.01.01.01.001 Mandor 0.0110 O.H 95,000.00 1,045.00
1.01.01.01.002 Kepala Tukang 0.0110 O.H 85,000.00 935.00
1.01.01.02.004 Tukang Kayu 0.1100 O.H 75,000.00 8,250.00
1.01.01.02.023 Pekerja 0.2200 O.H 70,000.00 15,400.00
1.01.02.13.031 Kayu Bekisting Meranti 0.0100 m3 2,407,500.00 24,075.00
1.01.02.07.072 Paku Biasa 2" - 5" 0.1334 Kg 17,600.00 2,347.84
1.01.02.06.086 Minyak Bekisting 0.0667 liter 9,000.00 600.30
1.01.02.13.024 Balok Kayu Meranti 0.0067 m3 2,528,900.00 16,943.63
1.01.02.14.013 Multipleks 9 Mm 0.1167 Lembar 131,750.00 15,375.23
1.01.02.13.033 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 1.0000 Batang 22,900.00 22,900.00

1 m2 Pekerjaan Pasang Bekisting Untuk Tangga (3 Nilai HSPK


2.01.01.03.02.021 m2 0.00
Kali Pakai) (Dibulatkan):
1.01.01.01.001 Mandor 0.0110 O.H 95,000.00 1,045.00
1.01.01.01.002 Kepala Tukang 0.0110 O.H 85,000.00 935.00
1.01.01.02.004 Tukang Kayu 0.1100 O.H 75,000.00 8,250.00
1.01.01.02.023 Pekerja 0.2200 O.H 70,000.00 15,400.00
1.01.02.13.031 Kayu Bekisting Meranti 0.0100 m3 2,407,500.00 24,075.00
1.01.02.07.072 Paku Biasa 2" - 5" 0.1334 Kg 18,000.00 2,401.20
1.01.02.06.086 Minyak Bekisting 0.0500 liter 9,630.00 481.50
1.01.02.13.024 Balok Kayu Meranti 0.0050 m3 2,700,000.00 13,500.00
1.01.02.14.013 Multipleks 9 Mm 0.1167 Lembar 120,000.00 14,004.00
1.01.02.13.033 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M 0.6667 Batang 18,000.00 12,000.60

1 m2 Pemasangan Bekisting jembatan untuk Nilai HSPK


2.01.01.03.02.022 m2 0.00
pengecoran beton (Dibulatkan):
1.01.01.02.023 Pekerja 0.1500 OH 70,000.00 10,500.00
1.01.01.02.004 Tukang kayu 0.0500 OH 75,000.00 3,750.00
1.01.01.01.002 Kepala tukang 0.0050 OH 85,000.00 425.00
1.01.01.01.001 Mandor 0.0080 OH 95,000.00 760.00
1.01.02.13.022 Kayu kelas III (papan) 0.0264 m3 3,000,000.00 79,200.00
1.01.02.07.072 Paku 5 cm – 12 cm 0.6000 kg 18,000.00 10,800.00
1.01.02.13.033 Dolken kayu ,  8–10 panjang 4m 0.5000 Batang 18,000.00 9,000.00

1 m2 Pembuatan lahan produksi tebal 8 cm beton Nilai HSPK


2.01.01.03.02.023 m2 0.00
f’c 14,5 MPa, slump (120 ± 20) mm (Dibulatkan):
1.01.01.02.023 Pekerja 0.1320 OH 70,000.00 9,240.00
1.01.01.01.002 Tukang batu 0.0220 OH 85,000.00 1,870.00
1.01.01.01.002 Kepala tukang 0.0020 OH 85,000.00 170.00
1.01.01.01.001 Mandor 0.0070 OH 95,000.00 665.00
1.01.02.03.001 Semen PC 26.0800 Kg 1,225.00 31,948.00
1.01.02.01.004 Pasir beton 0.0434 m3 292,698.50 12,706.39
1.01.02.01.020 Kerikil (maks 30 mm) 0.0457 m3 359,252.50 16,429.81
1.01.02.06.024 Air 17.2000 Liter 2.46 42.33

1 m2 Pembuatanlahan produksi tebal 10 cm beton Nilai HSPK


2.01.01.03.02.024 m2 0.00
f’c 14,5 MPa, slump (120 ± 20) mm (Dibulatkan):
1.01.01.02.023 Pekerja 0.1650 OH 70,000.00 11,550.00
1.01.01.01.002 Tukang batu 0.0280 OH 85,000.00 2,380.00
1.01.01.01.002 Kepala tukang 0.0300 OH 85,000.00 2,550.00
1.01.01.01.001 Mandor 0.0080 OH 95,000.00 760.00
1.01.02.03.001 Semen PC 32.6000 Kg 1,225.00 39,935.00
1.01.02.01.004 Pasir beton 0.0543 m3 292,698.50 15,882.99
1.01.02.01.020 Kerikil (maks 30mm) 0.0572 m3 359,252.50 20,537.27
1.01.02.06.024 Air 21.5000 Liter 2.46 52.91

1 m2 Pembuatan lahan produksi tebal 12 cm beton Nilai HSPK


2.01.01.03.02.025 m2 0.00
f’c 14,5 MPa, slump (120 ± 20) mm (Dibulatkan):
1.01.01.02.023 Pekerja 0.1980 OH 70,000.00 13,860.00
1.01.01.01.002 Tukang batu 0.0330 OH 85,000.00 2,805.00
1.01.01.01.002 Kepala tukang 0.0030 OH 85,000.00 255.00
1.01.01.01.001 Mandor 0.0100 OH 95,000.00 950.00
1.01.02.03.001 Semen PC 39.1200 Kg 1,225.00 47,922.00
1.01.02.01.004 Pasir beton 0.0651 m3 292,698.50 19,059.59
1.01.02.01.020 Kerikil (maks 30mm) 0.0686 m3 359,252.50 24,644.72
1.01.02.06.024 Air 25.8000 Liter 2.46 63.49

1 m2 Pembuatan lahan produksi tebal 15 cm beton Nilai HSPK


2.01.01.03.02.026 m2 0.00
f’c 14,5 MPa, slump (120 ± 20) mm (Dibulatkan):
1.01.01.02.023 Pekerja 0.2480 OH 70,000.00 17,360.00
1.01.01.01.002 Tukang batu 0.0410 OH 85,000.00 3,485.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.002 Kepala tukang 0.0040 OH 85,000.00 340.00
1.01.01.01.001 Mandor 0.0130 OH 95,000.00 1,235.00
1.01.02.03.001 Semen PC 48.9000 Kg 1,225.00 59,902.50
1.01.02.01.004 Pasir beton 0.0814 m3 292,698.50 23,824.49
1.01.02.01.020 Kerikil (maks 30mm) 0.0858 m3 359,252.50 30,805.90
1.01.02.06.024 Air 32.2500 Liter 2.46 79.37

1 m2 Pembuatan bekisting untuk pelat beton Nilai HSPK


2.01.01.03.02.027 m2 0.00
pracetak (5 kali pakai) (Dibulatkan):
1.01.01.02.023 Pekerja 0.0070 OH 70,000.00 490.00
1.01.01.02.004 Tukang kayu 0.0760 OH 75,000.00 5,700.00
1.01.01.01.002 Kepala tukang 0.0080 OH 85,000.00 680.00
1.01.01.01.001 Mandor 0.0010 OH 95,000.00 95.00
2.01.01.03.01.005 Lantai kerja t=10cm 0.0080 m3 795,960.00 6,367.68
1.01.02.07.019 Besi hollow (50 x 50 x 3) mm 9.3940 Kg 18,190.00 170,876.86
1.01.02.13.028 Kayu kaso 5/7 0.0050 m3 2,407,500.00 12,037.50
1.01.02.14.010 Phenol film 12 mm 0.0800 Lbr 153,812.50 12,305.00
1.01.02.06.086 Minyak cetakan (bekisting) 0.2000 liter 9,630.00 1,926.00
1.01.02.07.094 Dinabolt Ø 12mm (10 s.d.15 cm) 3.8820 buah 2,140.00 8,307.48

1 m2 Pembuatan bekisting untuk balok beton Nilai HSPK


2.01.01.03.02.028 m2 0.00
pracetak (10-12 kali pakai) (Dibulatkan):
1.01.01.02.023 Pekerja 0.0040 OH 70,000.00 280.00
1.01.01.02.004 Tukang kayu 0.0380 OH 75,000.00 2,850.00
1.01.01.01.002 Kepala tukang 0.0040 OH 85,000.00 340.00
1.01.01.01.001 Mandor 0.0010 OH 95,000.00 95.00
1.01.02.13.028 Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) 0.0050 m3 2,407,500.00 12,037.50
1.01.02.14.010 Phenol film 12 mm 0.0430 Lbr 153,812.50 6,613.94
1.01.02.06.086 Minyak cetakan (bekisting) 0.2000 liter 9,630.00 1,926.00
1.01.02.07.072 Paku (5 s.d.7) cm 0.0460 kg 18,000.00 828.00
1.01.02.07.094 Dinabolt Ø 12 mm (10 s.d.15 cm) 0.6930 buah 2,140.00 1,483.02

1 m2 Pembuatan bekisting untuk kolom beton Nilai HSPK


2.01.01.03.02.029 m2 0.00
pracetak (10-12 kali pakai) (Dibulatkan):
1.01.01.02.023 Pekerja 0.0040 OH 70,000.00 280.00
1.01.01.02.004 Tukang kayu 0.0380 OH 75,000.00 2,850.00
1.01.01.01.002 Kepala tukang 0.0040 OH 85,000.00 340.00
1.01.01.01.001 Mandor 0.0010 OH 95,000.00 95.00
1.01.02.13.028 Kayu kaso 5/7 (lebar 5 cm, tinggi 7 cm) 0.0040 m3 2,407,500.00 9,630.00
1.01.02.14.010 Phenol film 12 mm 0.0480 Lbr 153,812.50 7,383.00
1.01.02.06.086 Minyak cetakan (bekisting) 0.2000 liter 9,630.00 1,926.00
1.01.02.07.072 Paku (5 s.d.7) cm 0.0460 Kg 18,000.00 828.00
1.01.02.07.094 Dinabolt Ø 12 mm (10-15cm) 0.6930 buah 2,140.00 1,483.02

Pemasangan dan membuka bekisting 1 buah Nilai HSPK


2.01.01.03.02.030 Buah 0.00
komponen pelat beton pracetak (Dibulatkan):
1.01.01.02.023 Pekerja 0.0530 OH 70,000.00 3,710.00
1.01.01.02.004 Tukang kayu 0.0180 OH 75,000.00 1,350.00
1.01.01.01.001 Mandor 0.0050 OH 95,000.00 475.00

Pemasangan dan membuka bekisting 1 buah Nilai HSPK


2.01.01.03.02.031 Buah 0.00
komponen balok beton pracetak (Dibulatkan):
1.01.01.02.023 Pekerja 0.0890 OH 70,000.00 6,230.00
1.01.01.02.004 Tukang kayu 0.0300 OH 75,000.00 2,250.00
1.01.01.01.001 Mandor 0.0050 OH 95,000.00 475.00

Pemasangan dan membuka bekisting 1 buah Nilai HSPK


2.01.01.03.02.032 Buah 0.00
komponen kolom beton pracetak (Dibulatkan):
1.01.01.02.023 Pekerja 0.0710 OH 70,000.00 4,970.00
1.01.01.02.004 Tukang kayu 0.0240 OH 75,000.00 1,800.00
1.01.01.01.001 Mandor 0.0050 OH 95,000.00 475.00

Penuangan/menebar beton 1 m3 komponen untuk Nilai HSPK


2.01.01.03.02.033 m3 0.00
pelat pracetak (Dibulatkan):
1.01.01.02.023 Pekerja 0.0640 OH 70,000.00 4,480.00
1.01.01.01.002 Tukang batu 0.2440 OH 85,000.00 20,740.00
1.01.01.02.019 Tukang vibrator 0.1280 OH 75,000.00 9,600.00
1.01.01.01.002 Kepala tukang 0.0340 OH 85,000.00 2,890.00
1.01.01.01.001 Mandor 0.0730 OH 95,000.00 6,935.00

Penuangan/menebar beton 1 m3 komponen untuk Nilai HSPK


2.01.01.03.02.034 m3 0.00
balok pracetak (Dibulatkan):
1.01.01.02.023 Pekerja 0.0690 OH 70,000.00 4,830.00
1.01.01.01.002 Tukang batu 0.2420 OH 85,000.00 20,570.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.02.019 Tukang vibrator 0.1380 OH 75,000.00 10,350.00
1.01.01.01.002 Kepala tukang 0.0370 OH 85,000.00 3,145.00
1.01.01.01.001 Mandor 0.0730 OH 95,000.00 6,935.00

Penuangan/menebar beton 1 m3 komponen kolom Nilai HSPK


2.01.01.03.02.035 m3 0.00
pracetak (Dibulatkan):
1.01.01.02.023 Pekerja 0.0610 OH 70,000.00 4,270.00
1.01.01.01.002 Tukang batu 0.2130 OH 85,000.00 18,105.00
1.01.01.02.019 Tukang vibrator 0.1220 OH 75,000.00 9,150.00
1.01.01.01.002 Kepala tukang 0.0330 OH 85,000.00 2,805.00
1.01.01.01.001 Mandor 0.0730 OH 95,000.00 6,935.00

Nilai HSPK
2.01.01.03.02.036 Ereksi 1 buah komponen untuk pelat pracetak buah 0.00
(Dibulatkan):
1.01.01.03.003 Operator crane 0.0670 OH 163,200.00 10,934.40
1.01.01.03.005 Pembantu operator crane 0.0670 OH 76,160.00 5,102.72
1.01.01.02.023 Pekerja 0.0670 OH 70,000.00 4,690.00
1.01.01.01.002 Tukang batu 0.0670 OH 85,000.00 5,695.00
1.01.01.02.020 Tukang erection 0.1340 OH 75,000.00 10,050.00
1.01.01.01.002 Kepala tukang 0.0670 OH 85,000.00 5,695.00
1.01.01.01.001 Mandor 0.0670 OH 95,000.00 6,365.00
1.01.02.06.082 Solar 6.6760 L 12,733.00 85,005.51
1.01.02.22.007 Sewa crane 0.0670 unit hari 820,000.00 54,940.00
1.01.02.22.101 Sewa pipe support 1.1000 buah hari 80,250.00 88,275.00

Nilai HSPK
2.01.01.03.02.037 Ereksi 1 buah komponen untuk balok pracetak Buah 0.00
(Dibulatkan):
1.01.01.03.003 Operator crane 0.0610 OH 163,200.00 9,955.20
1.01.01.03.005 Pembantu operator crane 0.0610 OH 76,160.00 4,645.76
1.01.01.02.023 Pekerja 0.0610 OH 70,000.00 4,270.00
1.01.01.01.002 Tukang batu 0.0610 OH 85,000.00 5,185.00
1.01.01.02.020 Tukang erection 0.1220 OH 75,000.00 9,150.00
1.01.01.01.002 Kepala tukang 0.0610 OH 85,000.00 5,185.00
1.01.01.01.001 Mandor 0.0610 OH 95,000.00 5,795.00
1.01.02.06.082 Solar 6.1100 L 12,733.00 77,798.63
1.01.02.22.007 Sewa crane 0.0610 unit hari 820,000.00 50,020.00
1.01.02.22.102 Sewa scaffolding 1.1000 unit hari 1,605.00 1,765.50

Nilai HSPK
2.01.01.03.02.038 Ereksi 1 buah komponen untuk kolom pracetak Buah 0.00
(Dibulatkan):
1.01.01.03.003 Operator crane 0.0830 OH 163,200.00 13,545.60
1.01.01.03.005 Pembantu operator crane 0.0830 OH 76,160.00 6,321.28
1.01.01.02.023 Pekerja 0.0830 OH 70,000.00 5,810.00
1.01.01.01.002 Tukang batu 0.0830 OH 85,000.00 7,055.00
1.01.01.02.020 Tukang erection 0.1660 OH 75,000.00 12,450.00
1.01.01.01.002 Kepala tukang 0.0830 OH 85,000.00 7,055.00
1.01.01.01.001 Mandor 0.0830 OH 95,000.00 7,885.00
1.01.02.06.082 Solar 8.2770 L 12,733.00 105,391.04
1.01.02.22.007 Sewa crane 0.0830 unit hari 820,000.00 68,060.00
1.01.02.22.101 Sewa pipe support 2.2000 buah hari 80,250.00 176,550.00

Langsir 1 buah komponen untuk pelat pracetak ( ± Nilai HSPK


2.01.01.03.02.039 Buah 0.00
20 m) (Dibulatkan):
1.01.01.03.003 Operator crane 0.0190 OH 163,200.00 3,100.80
1.01.01.03.005 Pembantu operator crane 0.0190 OH 76,160.00 1,447.04
1.01.01.02.023 Pekerja 0.0190 OH 70,000.00 1,330.00
1.01.01.01.002 Tukang batu 0.0380 OH 85,000.00 3,230.00
1.01.02.06.082 Solar 1.8970 L 12,733.00 24,154.50
1.01.02.22.007 Sewa crane 0.0190 unit hari 820,000.00 15,580.00

Langsir 1 buah komponen untuk balok pracetak ( ± Nilai HSPK


2.01.01.03.02.040 Buah 0.00
20 m) (Dibulatkan):
1.01.01.03.003 Operator crane 0.0190 OH 163,200.00 3,100.80
1.01.01.03.005 Pembantu operator crane 0.0190 OH 76,160.00 1,447.04
1.01.01.02.023 Pekerja 0.0190 OH 70,000.00 1,330.00
1.01.01.01.002 Tukang batu 0.0380 OH 85,000.00 3,230.00
1.01.02.06.082 Solar 1.8970 L 12,733.00 24,154.50
1.01.02.22.007 Sewa crane 0.0190 unit hari 820,000.00 15,580.00

Langsir 1 buah komponen untuk kolom pracetak ( ± Nilai HSPK


2.01.01.03.02.041 Buah 0.00
20 m) (Dibulatkan):
1.01.01.03.003 Operator crane 0.0190 OH 163,200.00 3,100.80
1.01.01.03.005 Pembantu operator crane 0.0190 OH 76,160.00 1,447.04
1.01.01.02.023 Pekerja 0.0190 OH 70,000.00 1,330.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.002 Tukang batu 0.0380 OH 85,000.00 3,230.00
1.01.02.06.082 Solar 1.8970 L 12,733.00 24,154.50
1.01.02.22.007 Sewa crane 0.0190 unit hari 820,000.00 15,580.00

Nilai HSPK
2.01.01.03.02.042 1 m3 Bahan grout Tidak campuran m3 0.00
(Dibulatkan):
1.01.02.03.020 Semen grout 1,850.0000 Kg 6,088.30 11,263,355.00
1.01.02.06.024 Air 400.0000 Liter 2.46 984.40

Upah 1 titik pekerjaan grout pada joint beton Nilai HSPK


2.01.01.03.02.043 Titik 0.00
pracetak (Dibulatkan):
1.01.01.01.002 Tukang batu 0.3670 OH 85,000.00 31,195.00
1.01.01.01.002 Kepala tukang 0.0740 OH 85,000.00 6,290.00
1.01.01.01.001 Mandor 0.0370 OH 95,000.00 3,515.00

Nilai HSPK
2.01.01.03.02.044 1 m3 Bahan grout campuran m3 0.00
(Dibulatkan):
1.01.01.01.002 Tukang batu 0.3670 OH 85,000.00 31,195.00
1.01.01.01.002 Kepala tukang 0.0740 OH 85,000.00 6,290.00
1.01.01.01.001 Mandor 0.0370 OH 95,000.00 3,515.00
1.01.02.03.020 Semen grout 1,850.0000 Kg 6,088.30 11,263,355.00
1.01.02.06.024 Air 400.0000 Liter 2.46 984.40

Nilai HSPK
2.01.01.03.02.045 1 titik Pemasangan bekisting joint pracetak Titik 0.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.1470 OH 70,000.00 10,290.00
1.01.01.02.004 Tukang kayu 0.1470 OH 75,000.00 11,025.00
1.01.01.01.002 Kepala tukang 0.0150 OH 85,000.00 1,275.00
1.01.01.01.001 Mandor 0.0050 OH 95,000.00 475.00
1.01.02.13.028 Kayu kaso 5/7 0.0120 m3 2,407,500.00 28,890.00
1.01.02.13.031 Papan cor 0.0040 m3 2,407,500.00 9,630.00
1.01.02.07.072 Paku (5 s.d.7) cm 0.2640 Kg 18,000.00 4,752.00

Nilai HSPK
2.01.01.03.02.046 Upah 1 titik joint dengan sling Titik 0.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.2200 OH 70,000.00 15,400.00
1.01.01.02.004 Tukang kayu 0.0220 OH 75,000.00 1,650.00
1.01.01.02.002 Tukang besi 0.2200 OH 75,000.00 16,500.00
1.01.01.01.001 Mandor 0.0110 OH 95,000.00 1,045.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
2.01.01.04 D. PEKERJAAN PASANGAN DINDING DAN PLESTERAN
2.01.01.04.01 Pekerjaan Dinding
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Nilai HSPK
2.01.01.04.01.004 m2 100,390.00
Bata (1 Pc : 3 Ps) (Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 110,000.00 1,650.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.3000 O.H 80,000.00 24,000.00
1.01.02.03.001 Semen Portland 14.3720 kg 1,282.50 18,432.09
1.01.02.01.006 Pasir Pasang 0.0400 m3 135,000.00 5,400.00
1.01.02.05.001 Bata Merah Uk.5 X 11 X 22 70.0000 bh 585.00 40,950.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Nilai HSPK


m2 1,736,610.00
Bata (1 Pc : 3 Ps) Uk.5 X 10 X 24 (Dibulatkan):
Mandor 0.0150 O.H 95,000.00 1,425.00
Kepala Tukang 0.0100 O.H 90,000.00 900.00
Tukang Batu 0.1000 O.H 90,000.00 9,000.00
Pekerja 0.3000 O.H 0.00 0.00
Semen Portland 14.3720 kg 85,000.00 1,221,620.00
Pasir Pasang 0.0400 m3 266,109.00 10,644.36
Bata Merah Uk.5 X 10 X 24 83.0000 bh 5,940.00 493,020.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Nilai HSPK


2.01.01.04.01.005 m2 0.00
Bata (1 Pc : 4 Ps) (Dibulatkan):
1.01.01.01.001 Mandor 0.0300 O.H 95,000.00 2,850.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.01.002 Tukang Batu 0.2000 O.H 85,000.00 17,000.00
1.01.01.02.023 Pekerja 0.6000 O.H 70,000.00 42,000.00
1.01.02.03.001 Semen Portland 26.5520 kg 1,225.00 32,526.20
1.01.02.01.006 Pasir Pasang 0.0930 m3 266,109.00 24,748.14
1.01.02.05.001 Bata Merah Uk.5 X 11 X 22 140.0000 bh 500.00 70,000.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Nilai HSPK


2.01.01.04.01.006 m2 0.00
Bata (1 Pc : 4 Ps) (Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 85,000.00 8,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.03.001 Semen Portland 11.5000 kg 1,225.00 14,087.50
1.01.02.01.006 Pasir Pasang 0.0430 m3 266,109.00 11,442.69
1.01.02.05.001 Bata Merah Uk.5 X 11 X 22 70.0000 bh 500.00 35,000.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Nilai HSPK


2.01.01.04.01.007 m2 187,890.00
Bata (1 Pc : 5 Ps) (Dibulatkan):
1.01.01.01.001 Mandor 0.0300 O.H 95,000.00 2,850.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.01.002 Tukang Batu 0.2000 O.H 85,000.00 17,000.00
1.01.01.02.023 Pekerja 0.6000 O.H 70,000.00 42,000.00
1.01.02.03.001 Semen Portland 22.2000 kg 1,225.00 27,195.00
1.01.02.01.006 Pasir Pasang 0.1020 m3 266,109.00 27,143.12
1.01.02.05.001 Bata Merah Uk.5 X 11 X 22 140.0000 bh 500.00 70,000.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Nilai HSPK


2.01.01.04.01.008 m2 95,040.00
Bata (1 Pc : 5 Ps) (Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 110,000.00 1,650.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.3000 O.H 80,000.00 24,000.00
1.01.02.03.001 Semen Portland 9.6800 kg 1,282.50 12,414.60
1.01.02.01.006 Pasir Pasang 0.0450 m3 135,000.00 6,075.00
1.01.02.05.001 Bata Merah Uk.5 X 11 X 22 70.0000 bh 585.00 40,950.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Nilai HSPK


m2 97,110.00
Bata (1 Pc : 5 Ps) 5x10x24 (Dibulatkan):
Mandor 0.0150 O.H 95,000.00 1,425.00
Kepala Tukang 0.0100 O.H 85,000.00 850.00
Tukang Batu 0.1000 O.H 85,000.00 8,500.00
Pekerja 0.3000 O.H 70,000.00 21,000.00
Semen Portland 9.6800 kg 1,225.00 11,858.00
Pasir Pasang 0.0450 m3 266,109.00 11,974.91
Bata Merah Uk.5 X 10 X 24 83.0000 bh 500.00 41,500.00
1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1 Nilai HSPK
2.01.01.04.01.009 m2 188,680.00
Bata (1 Pc : 6 Ps) (Dibulatkan):
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.001 Mandor 0.0300 O.H 95,000.00 2,850.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.01.002 Tukang Batu 0.2000 O.H 85,000.00 17,000.00
1.01.01.02.023 Pekerja 0.6000 O.H 70,000.00 42,000.00
1.01.02.03.001 Semen Portland 18.5000 kg 1,225.00 22,662.50
1.01.02.01.006 Pasir Pasang 0.1220 m3 266,109.00 32,465.30
1.01.02.05.001 Bata Merah Uk.5 X 11 X 22 140.0000 bh 500.00 70,000.00

1 m2 Pekerjaan Pemasangan Batu Merah Tebal 1/2 Nilai HSPK


2.01.01.04.01.010 m2 93,290.00
Bata (1 Pc : 6 Ps) (Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 85,000.00 8,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.03.001 Semen Portland 8.3200 kg 1,225.00 10,192.00
1.01.02.01.025 Pasir Pasang 0.0490 m3 160,000.00 7,840.00
1.01.02.05.001 Bata Merah Uk.5 X 11 X 22 70.0000 bh 500.00 35,000.00
OVERHEAD + PROFIT 10% 8,480.70

Pemasangan 1m2 dinding bata merah (5x11x22)cm Nilai HSPK


2.01.01.04.01.011 m2 88,050.00
tebal ½ batu campuran 1SP :8PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3000 OH 70,000.00 21,000.00
1.01.01.01.002 Tukang batu 0.1000 OH 85,000.00 8,500.00
1.01.01.01.002 Kepala tukang 0.0100 OH 85,000.00 850.00
1.01.01.01.001 Mandor 0.0150 OH 95,000.00 1,425.00
1.01.02.05.001 Bata merah 70.0000 bh 500.00 35,000.00
1.01.02.03.001 Semen Portland 6.5000 Kg 1,225.00 7,962.50
1.01.02.01.006 Pasir pasang 0.0500 m3 266,109.00 13,305.45

Pemasangan 1m2 dinding bata merah (5x11x22)cm Nilai HSPK


2.01.01.04.01.012 m2 0.00
tebal ½ batu campuran 1SP : 3KP :10PP (Dibulatkan):

1.01.01.02.023 Pekerja 0.3000 OH 70,000.00 21,000.00


1.01.01.01.002 Tukang batu 0.1000 OH 85,000.00 8,500.00
1.01.01.01.002 Kepala tukang 0.0100 OH 85,000.00 850.00
1.01.01.01.001 Mandor 0.0150 OH 95,000.00 1,425.00
1.01.02.05.001 Bata merah 70.0000 bh 500.00 35,000.00
1.01.02.03.001 Semen Portland 4.5000 Kg 1,225.00 5,512.50
1.01.02.01.041 Kapur padam 0.0150 m3 133,054.50 1,995.82
1.01.02.01.006 Pasir pasang 0.0500 m3 266,109.00 13,305.45

Pemasangan 1m2 dinding bata merah (5x11x22) cm Nilai HSPK


2.01.01.04.01.013 m2 0.00
tebal ½ batu campuran 1SM : 1KP :1PP (Dibulatkan):

1.01.01.02.023 Pekerja 0.3000 OH 70,000.00 21,000.00


1.01.01.01.002 Tukang batu 0.1000 OH 85,000.00 8,500.00
1.01.01.01.002 Kepala tukang 0.0100 OH 85,000.00 850.00
1.01.01.01.001 Mandor 0.0150 OH 95,000.00 1,425.00
1.01.02.05.001 Bata merah 70.0000 bh 500.00 35,000.00
1.01.02.03.001 Semen Portland 0.0180 Kg 1,225.00 22.05
1.01.02.01.041 Kapur padam 0.0180 m3 133,054.50 2,394.98
1.01.02.01.006 Pasir pasang 0.0180 m3 266,109.00 4,789.96

Pemasangan 1m2 dinding bata merah (5x11x22) cm Nilai HSPK


2.01.01.04.01.014 m2 0.00
tebal ½ batu campuran 1SM : 1KP :2PP (Dibulatkan):

1.01.01.02.023 Pekerja 0.3000 OH 70,000.00 21,000.00


1.01.01.01.002 Tukang batu 0.1000 OH 85,000.00 8,500.00
1.01.01.01.002 Kepala tukang 0.0100 OH 85,000.00 850.00
1.01.01.01.001 Mandor 0.0150 OH 95,000.00 1,425.00
1.01.02.05.001 Bata merah 70.0000 bh 500.00 35,000.00
1.01.02.03.001 Semen Portland 0.0140 Kg 1,225.00 17.15
1.01.02.01.041 Kapur padam 0.0140 m3 133,054.50 1,862.76
1.01.02.01.006 Pasir pasang 0.0280 m3 266,109.00 7,451.05

Pemasangan 1m2 dinding conblock HB20 Nilai HSPK


2.01.01.04.01.015 m2 0.00
campuran 1SP : 3PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3500 OH 70,000.00 24,500.00
1.01.01.01.002 Tukang batu 0.1500 OH 85,000.00 12,750.00
1.01.01.01.002 Kepala tukang 0.0150 OH 85,000.00 1,275.00
1.01.01.01.001 Mandor 0.0180 OH 95,000.00 1,710.00
1.01.02.05.005 HB-20 12.5000 bh 13,375.00 167,187.50
1.01.02.03.001 Semen Portland 30.3200 Kg 1,225.00 37,142.00
1.01.02.01.006 Pasir pasang 0.7280 m3 266,109.00 193,727.35
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.02.07.086 Besi angker diameter 8 0.2800 Kg 13,268.00 3,715.04

Pemasangan 1m2 dinding conblock HB20 Nilai HSPK


2.01.01.04.01.016 m2 0.00
campuran 1SP : 4PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3500 OH 70,000.00 24,500.00
1.01.01.01.002 Tukang batu 0.1500 OH 85,000.00 12,750.00
1.01.01.01.002 Kepala tukang 0.0150 OH 85,000.00 1,275.00
1.01.01.01.001 Mandor 0.0180 OH 95,000.00 1,710.00
1.01.02.05.005 HB-20 12.5000 bh 13,375.00 167,187.50
1.01.02.03.001 Semen Portland 24.2600 Kg 1,225.00 29,718.50
1.01.02.01.006 Pasir pasang 0.7720 m3 266,109.00 205,436.15
1.01.02.07.086 Besi angker diameter 8 0.2800 Kg 13,268.00 3,715.04

Pemasangan 1m2 dinding conblock HB15 Nilai HSPK


2.01.01.04.01.017 m2 0.00
campuran 1SP : 3PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3200 OH 70,000.00 22,400.00
1.01.01.01.002 Tukang batu 0.1200 OH 85,000.00 10,200.00
1.01.01.01.002 Kepala tukang 0.0120 OH 85,000.00 1,020.00
1.01.01.01.001 Mandor 0.0160 OH 95,000.00 1,520.00
1.01.02.05.005 HB-15 12.5000 bh 13,375.00 167,187.50
1.01.02.03.001 Semen Portland 22.7400 Kg 1,225.00 27,856.50
1.01.02.01.006 Pasir pasang 0.5500 m3 266,109.00 146,359.95
1.01.02.07.086 Besi angker diameter 8 0.2800 Kg 13,268.00 3,715.04

Pemasangan 1 m2 dinding conblock HB15 Nilai HSPK


2.01.01.04.01.018 m2 0.00
campuran 1SP :4PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3200 OH 70,000.00 22,400.00
1.01.01.01.002 Tukang batu 0.1200 OH 85,000.00 10,200.00
1.01.01.01.002 Kepala tukang 0.0120 OH 85,000.00 1,020.00
1.01.01.01.001 Mandor 0.0160 OH 95,000.00 1,520.00
1.01.02.05.005 HB-15 12.5000 bh 13,375.00 167,187.50
1.01.02.03.001 Semen Portland 18.2000 Kg 1,225.00 22,295.00
1.01.02.01.006 Pasir pasang 0.5820 m3 266,109.00 154,875.44
1.01.02.07.086 Besi angker diameter 8 0.2800 Kg 13,268.00 3,715.04

Pemasangan 1 m2 dinding conblock HB10 Nilai HSPK


2.01.01.04.01.019 m2 0.00
campuran 1SP :3PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3000 OH 70,000.00 21,000.00
1.01.01.01.002 Tukang batu 0.1000 OH 85,000.00 8,500.00
1.01.01.01.002 Kepala tukang 0.0100 OH 85,000.00 850.00
1.01.01.01.001 Mandor 0.0150 OH 95,000.00 1,425.00
1.01.02.05.003 HB-10 12.5000 bh 8,827.50 110,343.75
1.01.02.03.001 Semen Portland 15.1600 Kg 1,225.00 18,571.00
1.01.02.01.006 Pasir pasang 0.3640 m3 266,109.00 96,863.68
1.01.02.07.086 Besi angker diameter 8 0.2800 Kg 13,268.00 3,715.04

Pemasangan 1 m2 dinding conblock HB10 Nilai HSPK


2.01.01.04.01.020 m2 0.00
campuran 1SP : 4PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3000 OH 70,000.00 21,000.00
1.01.01.01.002 Tukang batu 0.1000 OH 85,000.00 8,500.00
1.01.01.01.002 Kepala tukang 0.0100 OH 85,000.00 850.00
1.01.01.01.001 Mandor 0.0150 OH 95,000.00 1,425.00
1.01.02.05.003 HB-10 12.5000 bh 8,827.50 110,343.75
1.01.02.03.001 Semen Portland 12.1300 Kg 1,225.00 14,859.25
1.01.02.01.006 Pasir pasang 0.3880 m3 266,109.00 103,250.29
1.01.02.07.086 Besi angker diameter 8 0.2800 Kg 13,268.00 3,715.04

1 m2 Pekerjaan Pemasangan Dinding Terawang


Nilai HSPK
2.01.01.04.01.021 (Roster) Ukuran (12 X 11 X 24) Cm, Campuran Spesi m2 554,450.00
(Dibulatkan):
1 Pc : 3 Pp
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 85,000.00 8,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.02.074 Terawang (Roster) 30.0000 buah 15,000.00 450,000.00
1.01.02.03.001 Semen Portland 14.0000 kg 1,225.00 17,150.00
1.01.02.01.025 Pasir Pasang 0.0320 m3 160,000.00 5,120.00
OVERHEAD + PROFIT 10% 50,404.50

1 m2 Pekerjaan Pemasangan Dinding Terawang


Nilai HSPK
2.01.01.04.01.022 (Roster) Ukuran (12 X 11 X 24) Cm, Campuran Spesi m2 320,760.00
(Dibulatkan):
1 Pc : 4 Pp
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 85,000.00 8,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.05.007 Terawang (Roster) 30.0000 buah 8,025.00 240,750.00
1.01.02.03.001 Semen Portland 11.0000 kg 1,225.00 13,475.00
1.01.02.01.025 Pasir Pasang 0.0350 m3 160,000.00 5,600.00
OVERHEAD + PROFIT 10% 29,160.00

Pemasangan 1 m2 dinding bata berongga ekspose Nilai HSPK


2.01.01.04.01.023 m2 396,510.00
12x11x24 campuran 1SP :3PP (Dibulatkan):
1.01.01.02.023 Pekerja 0.3000 OH 70,000.00 21,000.00
1.01.01.01.002 Tukang batu 0.1500 OH 85,000.00 12,750.00
1.01.01.01.002 Kepala tukang 0.0150 OH 85,000.00 1,275.00
1.01.01.01.001 Mandor 0.0150 OH 95,000.00 1,425.00
1.01.02.05.008 Bata berongga 30.0000 bh 10,058.00 301,740.00
1.01.02.03.001 Semen Portland 14.0000 Kg 1,225.00 17,150.00
1.01.02.01.025 Pasir pasang 0.0320 m3 160,000.00 5,120.00
OVERHEAD + PROFIT 10% 36,046.00

Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm Nilai HSPK


2.01.01.04.01.024 m2 0.00
dengan mortar siap pakai B. (Dibulatkan):
1.01.01.02.023 Pekerja 0.6700 OH 70,000.00 46,900.00
1.01.01.01.002 Tukang batu 1.3000 OH 85,000.00 110,500.00
1.01.01.01.002 Kepala tukang 0.1300 OH 85,000.00 11,050.00
1.01.01.01.001 Mandor 0.0300 OH 95,000.00 2,850.00
1.01.02.05.003 Bata ringan tebal 7,5cm 8.4000 bh 8,827.50 74,151.00
1.01.02.03.017 Mortar siap pakai 0.4730 Kg 4,229.18 2,000.40
Peralatan 10.0000 % 76,151.40 7,615.14

Pemasangan 1m2 dinding bata ringan tebal 10 cm Nilai HSPK


2.01.01.04.01.025 m2 0.00
dengan mortar siap pakai (Dibulatkan):
1.01.01.02.023 Pekerja 0.6710 OH 70,000.00 46,970.00
1.01.01.01.002 Tukang batu 1.3000 OH 85,000.00 110,500.00
1.01.01.01.002 Kepala tukang 0.1300 OH 85,000.00 11,050.00
1.01.01.01.001 Mandor 0.0030 OH 95,000.00 285.00
1.01.02.05.004 Bata ringan tebal 10cm 8.4000 bh 11,288.50 94,823.40
1.01.02.03.017 Mortar siap pakai 0.0630 Kg 4,229.18 266.44
Peralatan 10.0000 % 95,089.84 9,508.98

1 m2 Pasangan Dinding bata beton ringan; Nilai HSPK


2.01.01.04.01.026 m2 0.00
Campuran Spesi 1:3 (Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 85,000.00 8,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.05.002 Bata beton ringan 0.1127 M3 1,036,509.00 116,814.56
1.01.02.03.001 Semen PC 15.1600 kg 1,225.00 18,571.00
1.01.02.01.006 Pasir Pasang 0.3640 m3 266,109.00 96,863.68

1 m2 Pasangan Dinding bata beton ringan; Nilai HSPK


2.01.01.04.01.027 m2 0.00
Campuran Spesi 1:4 (Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.02.008 Tukang Batu Kasar 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.05.002 Bata beton ringan 0.1127 M3 1,036,509.00 116,814.56
1.01.02.03.001 Semen PC 12.3920 kg 1,225.00 15,180.20
1.01.02.01.006 Pasir Pasang 0.3880 m3 266,109.00 103,250.29
2.01.01.04.02 Pekerjaan Plesteran
Nilai HSPK
2.01.01.04.02.001 1 m2 Pekerjaan Plesteran 1 Pc : 1 Ps Tebal 15 Mm m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Kepala Tukang 0.0150 O.H 85,000.00 1,275.00
1.01.01.01.002 Tukang Batu 0.1500 O.H 85,000.00 12,750.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.03.001 Semen Portland 15.5040 kg 1,225.00 18,992.40
1.01.02.01.006 Pasir Pasang 0.0160 m3 266,109.00 4,257.74

Nilai HSPK
2.01.01.04.02.002 1 m2 Pekerjaan Plesteran 1 Pc : 2 Ps Tebal 15 Mm m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 95,000.00 1,425.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.002 Kepala Tukang 0.0150 O.H 85,000.00 1,275.00
1.01.01.01.002 Tukang Batu 0.1500 O.H 85,000.00 12,750.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.03.001 Semen Portland 10.2240 kg 1,225.00 12,524.40
1.01.02.01.006 Pasir Pasang 0.0200 m3 266,109.00 5,322.18

Nilai HSPK
2.01.01.04.02.003 1 m2 Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 15 Mm m2 53,660.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 110,000.00 1,650.00
1.01.01.01.002 Kepala Tukang 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Tukang Batu 0.1500 O.H 90,000.00 13,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 80,000.00 24,000.00
1.01.02.03.001 Semen Portland 7.7760 kg 1,282.50 9,972.72
1.01.02.01.006 Pasir Pasang 0.0230 m3 135,000.00 3,105.00

Nilai HSPK
2.01.01.04.02.005 1 m2 Pekerjaan Plesteran 1 Pc : 5 Ps Tebal 15 Mm m2 50,740.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 110,000.00 1,650.00
1.01.01.01.002 Kepala Tukang 0.0150 O.H 95,000.00 1,425.00
1.01.01.01.002 Tukang Batu 0.1500 O.H 90,000.00 13,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 80,000.00 24,000.00
1.01.02.03.001 Semen Portland 5.1840 kg 1,282.50 6,648.48
1.01.02.01.006 Pasir Pasang 0.0260 m3 135,000.00 3,510.00

Nilai HSPK
2.01.01.04.02.024 1 m2 Pekerjaan Acian m2 34,350.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0100 O.H 110,000.00 1,100.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.2000 O.H 80,000.00 16,000.00
1.01.02.03.001 Semen Portland 3.2520 kg 1,282.50 4,170.69
OVERHEAD + PROFIT 10% 3,122.07

Nilai HSPK
2.01.01.04.02.025 1 m' Pekerjaan Benangan m' 18,300.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0040 O.H 110,000.00 440.00
1.01.01.01.002 Kepala Tukang 0.0400 O.H 95,000.00 3,800.00
1.01.01.01.002 Tukang Batu 0.0400 O.H 90,000.00 3,600.00
1.01.01.02.023 Pekerja 0.0800 O.H 80,000.00 6,400.00
1.01.02.03.001 Semen Portland 0.5000 kg 1,282.50 641.25
1.01.02.01.025 Pasir Pasang 0.0130 m3 135,000.00 1,755.00
OVERHEAD + PROFIT 10% 1,663.63

2.01.01.05 E. PEKERJAAN PENUTUP LANTAI & DINDING


2.01.01.05.01 Penutup Lantai
1 m2 Pekerjaan Pasangan Lantai Keramik Polos Nilai HSPK
2.01.01.05.01.006 m2 250,500.00
Uk.40X40 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 110,000.00 3,850.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 90,000.00 31,500.00
1.01.01.02.023 Pekerja 0.7000 O.H 80,000.00 56,000.00
1.01.02.03.001 Semen Portland 9.8000 kg 1,282.50 12,568.50
1.01.02.03.014 Semen Warna 1.3000 Kg 10,890.00 14,157.00
1.01.02.01.025 Pasir Pasang 0.0450 m3 135,000.00 6,075.00
1.01.02.10.064 Keramik Polos 40X40 Cm 1.0608 m2 94,500.00 100,245.60
OVERHEAD + PROFIT 10% 22,772.11

1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk. Nilai HSPK


2.01.01.05.01.010 m2 182,220.00
30X30 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 110,000.00 3,850.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 90,000.00 31,500.00
1.01.01.02.023 Pekerja 0.7000 O.H 80,000.00 56,000.00
1.01.02.03.001 Semen Portland 10.0000 kg 1,225.00 12,250.00
1.01.02.03.014 Semen Warna 1.5000 Kg 10,890.00 16,335.00
1.01.02.01.006 Pasir Pasang 0.0450 m3 135,000.00 6,075.00
1.01.02.10.065 Keramik Motif 30X30 Cm 1.0683 m2 49,500.00 52,880.85
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

1 m2 Pekerjaan Pasangan Lantai Keramik Motif Uk. Nilai HSPK


2.01.01.05.01.011 m2 169,890.00
20X20 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 110,000.00 3,850.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 90,000.00 31,500.00
1.01.01.02.023 Pekerja 0.7000 O.H 80,000.00 56,000.00
1.01.02.10.067 Keramik Motif 20X20 Cm 1.0600 m2 36,000.00 38,160.00
1.01.02.03.001 Semen Portland 10.4000 kg 1,282.50 13,338.00
1.01.02.01.025 Pasir Pasang 0.0450 m3 135,000.00 6,075.00
1.01.02.03.014 Semen Warna 1.6200 Kg 10,890.00 17,641.80
OVERHEAD + PROFIT 10% 16,988.98

1 m2 Pekerjaan Pasangan Lantai Parquet / Nilai HSPK


2.01.01.05.01.019 m2 0.00
GymFloor (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.02.004 Tukang Kayu 0.3500 O.H 75,000.00 26,250.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.10.116 Parqueti Jati 1.0500 m2 149,800.00 157,290.00
1.01.02.06.056 Lem 0.6000 Kg 28,000.00 16,800.00

2.01.01.05.02 Pekerjaan Penutup Dinding


1 m2 Pekerjaan Pasangan Dinding Keramik Polos Nilai HSPK
2.01.01.05.02.002 m2 230,680.00
Uk.20X20 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0450 O.H 110,000.00 4,950.00
1.01.01.01.002 Kepala Tukang 0.0450 O.H 95,000.00 4,275.00
1.01.01.01.002 Tukang Batu 0.4500 O.H 90,000.00 40,500.00
1.01.01.02.023 Pekerja 0.9000 O.H 80,000.00 72,000.00
1.01.02.03.001 Semen Portland 9.3000 Kg 1,282.50 11,927.25
1.01.02.03.014 Semen Warna 1.9400 Kg 10,890.00 21,126.60
1.01.02.01.025 Pasir Pasang 0.0180 m3 135,000.00 2,430.00
1.01.02.10.030 Dinding Keramik 20X20 Cm (Polos) 1.0500 m2 50,000.00 52,500.00
OVERHEAD + PROFIT 10% 20,970.89

1 m2 Pekerjaan Pasangan Dinding Keramik Motif Nilai HSPK


2.01.01.05.02.004 m2 261,290.00
Uk.30X60 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0450 O.H 110,000.00 4,950.00
1.01.01.01.002 Kepala Tukang 0.0450 O.H 95,000.00 4,275.00
1.01.01.01.002 Tukang Batu 0.4500 O.H 90,000.00 40,500.00
1.01.01.02.023 Pekerja 0.9000 O.H 80,000.00 72,000.00
1.01.02.03.001 Semen Portland 9.3000 Kg 1,282.50 11,927.25
1.01.02.03.014 Semen Warna 1.9400 Kg 10,890.00 21,126.60
1.01.02.01.025 Pasir Pasang 0.0180 m3 135,000.00 2,430.00
1.01.02.10.055 Dinding Keramik 20X25 Cm (Motif) 1.0500 m2 76,500.00 80,325.00
OVERHEAD + PROFIT 10% 23,753.39
Nilai HSPK
2.01.01.05.02.005 Pemasangan 1 m² penutup papan GRC rangkap m2 511,170.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0143 O.H 95,000.00 1,361.67
1.01.01.01.002 Kepala Tukang 0.0850 O.H 85,000.00 7,225.00
1.01.01.01.002 Tukang 0.8500 O.H 85,000.00 72,250.00
1.01.01.02.023 Pekerja 0.2833 O.H 70,000.00 19,833.33
1.01.02.07.065 Paku Skrup 0.0300 Kg 16,000.00 480.00
1.01.02.06.055 Lem Kayu 0.8000 Kg 16,000.00 12,800.00
1.01.02.14.039 Papan GRC Ex. Elephant tebal 8 mm 2.0000 m2 160,000.00 320,000.00
1.01.02.14.040 Galvalume 2.0500 m1 15,000.00 30,750.00
OVERHEAD + PROFIT 10% 46,470.00

1 m2 Pekerjaan Pasangan Dinding Keramik Motif Nilai HSPK


2.01.01.05.02.005 m2 212,390.00
Uk.20X20 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0450 O.H 95,000.00 4,275.00
1.01.01.01.002 Kepala Tukang 0.0450 O.H 85,000.00 3,825.00
1.01.01.01.002 Tukang Batu 0.4500 O.H 85,000.00 38,250.00
1.01.01.02.023 Pekerja 0.9000 O.H 70,000.00 63,000.00
1.01.02.03.001 Semen Portland 9.3000 Kg 1,225.00 11,392.50
1.01.02.03.014 Semen Warna 1.9400 Kg 15,000.00 29,100.00
1.01.02.01.006 Pasir Pasang 0.0180 m3 266,109.00 4,789.96
1.01.02.10.056 Dinding Keramik 20X20 Cm (Motif) 1.0500 m2 55,000.00 57,750.00

1 m2 Pekerjaan Pasangan Dinding Keramik Motif Nilai HSPK


2.01.01.05.02.006 m2 0.00
Uk.10X20 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0450 O.H 95,000.00 4,275.00
1.01.01.01.002 Kepala Tukang 0.0450 O.H 85,000.00 3,825.00
1.01.01.01.002 Tukang Batu 0.4500 O.H 85,000.00 38,250.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.02.023 Pekerja 0.9000 O.H 70,000.00 63,000.00
1.01.02.03.001 Semen Portland 9.3000 Kg 1,225.00 11,392.50
1.01.02.03.014 Semen Warna 2.7500 Kg 15,000.00 41,250.00
1.01.02.01.006 Pasir Pasang 0.0180 m3 266,109.00 4,789.96
1.01.02.10.027 Dinding Keramik 10X20 Cm (Motif) 1.0500 m2 59,759.50 62,747.48

Nilai HSPK
2.01.01.05.02.007 1 m' Pekerjaan Pasangan Plint Keramik 10X20 Cm m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.03.001 Semen Portland 1.1400 Kg 1,225.00 1,396.50
1.01.02.03.014 Semen Warna 0.0250 Kg 15,000.00 375.00
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.10.091 Plint Keramik 10X20 Cm 5.3000 buah 4,066.00 21,549.80

Nilai HSPK
2.01.01.05.02.008 1 m' Pekerjaan Pasangan Plint Keramik 5X20 Cm m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.090 Plint Keramik 5X20 Cm 5.3000 buah 1,819.00 9,640.70
1.01.02.03.001 Semen Portland 0.5600 Kg 1,225.00 686.00
1.01.02.01.006 Pasir Pasang 0.0010 m3 266,109.00 266.11
1.01.02.03.014 Semen Warna 0.0130 Kg 15,000.00 195.00

Nilai HSPK
2.01.01.05.02.009 1 m' Pekerjaan Pasangan Plint Keramik 10X10 Cm m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.03.001 Semen Portland 1.1400 Kg 1,225.00 1,396.50
1.01.02.03.014 Semen Warna 0.0500 Kg 15,000.00 750.00
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.10.089 Plint Keramik 10X10 Cm 10.6000 buah 1,605.00 17,013.00

1 m' Pekerjaan Pasangan Ubin Plint Granit 10X40 Nilai HSPK


2.01.01.05.02.010 m' 0.00
Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.101 Plint Granit 10X40 Cm 2.6500 buah 5,564.00 14,744.60
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

1 m' Pekerjaan Pasangan Ubin Plint Granit 10X30 Nilai HSPK


2.01.01.05.02.011 m' 0.00
Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.100 Plint Ubin Granit 10X30 Cm 3.5300 buah 3,852.00 13,597.56
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

1 m' Pekerjaan Pasangan Ubin Plin Teralux Kerang Nilai HSPK


2.01.01.05.02.012 m' 0.00
10X40 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.103 Plint Teralux Kerang 10X40 Cm 2.6300 buah 3,638.00 9,567.94
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

1 m' Pekerjaan Pasangan Ubin Plin Teralux Kerang Nilai HSPK


2.01.01.05.02.013 m' 0.00
10X30 Cm (Dibulatkan):
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.102 Plint Teralux Kerang 10X30 Cm 3.5300 buah 2,782.00 9,820.46
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

1 m' Pekerjaan Pasangan Ubin Plin Teralux Marmer Nilai HSPK


2.01.01.05.02.014 m' 0.00
10X60 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.106 Plint Teralux Marmer 10X60 Cm 1.7000 buah 5,992.00 10,186.40
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

1 m' Pekerjaan Pasangan Ubin Plin Teralux Marmer Nilai HSPK


2.01.01.05.02.015 m' 0.00
10X40 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.105 Plint Teralux Marmer 10X40 Cm 2.6500 buah 4,922.00 13,043.30
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

1 m' Pekerjaan Pasangan Ubin Plin Teralux Marmer Nilai HSPK


2.01.01.05.02.016 m' 0.00
10X30 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 85,000.00 765.00
1.01.01.01.002 Tukang Batu 0.0900 O.H 85,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0900 O.H 70,000.00 6,300.00
1.01.02.10.104 Plint Teralux Marmer 10X30 Cm 3.5300 buah 4,066.00 14,352.98
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

Pemasangan 1 m’ plint internal cove artistik 5 cm x Nilai HSPK


2.01.01.05.02.017 m' 0.00
5 cm x 20 cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0380 O.H 95,000.00 3,610.00
1.01.01.01.002 Kepala Tukang 0.0750 O.H 85,000.00 6,375.00
1.01.01.01.002 Tukang Batu 0.7500 O.H 85,000.00 63,750.00
1.01.01.02.023 Pekerja 0.7500 O.H 70,000.00 52,500.00
1.01.02.10.113 Internal Cove 5x5x20 Cm 5.3000 buah 32,956.00 174,666.80
1.01.02.03.001 Semen Portland 1.1400 kg 1,225.00 1,396.50
1.01.02.01.006 Pasir Pasang 0.0030 m3 266,109.00 798.33
1.01.02.03.014 Semen Warna 0.0100 Kg 15,000.00 150.00

1 m' Pekerjaan Pasangan Plint Marmer Tinggi 10 Nilai HSPK


2.01.01.05.02.018 m' 0.00
Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0420 O.H 95,000.00 3,990.00
1.01.01.01.002 Kepala Tukang 0.0420 O.H 85,000.00 3,570.00
1.01.01.01.002 Tukang Batu 0.4200 O.H 85,000.00 35,700.00
1.01.01.02.023 Pekerja 0.8400 O.H 70,000.00 58,800.00
1.01.02.03.001 Semen Portland 16.8520 Kg 1,225.00 20,643.70
1.01.02.01.006 Pasir Pasang 0.0320 m3 266,109.00 8,515.49
1.01.02.03.014 Semen Warna 1.3000 Kg 15,000.00 19,500.00
1.01.02.02.006 Plint Marmer 0.1100 m' 26,750.00 2,942.50

Nilai HSPK
2.01.01.05.02.019 1 m2 Pekerjaan Pemasangan Batu Palimanan m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7520 Kg 1,225.00 14,396.20
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.037 Batu Palimanan 1.1000 m2 99,242.50 109,166.75
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

Nilai HSPK
2.01.01.05.02.020 1 m2 Pekerjaan Pemasangan Batu Candi m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7520 Kg 1,225.00 14,396.20
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.054 Batu Candi 1.1000 m2 139,100.00 153,010.00

Nilai HSPK
2.01.01.05.02.021 1 m2 Pekerjaan Pemasangan Batu Ampyang m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7520 Kg 1,225.00 14,396.20
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.043 Batu Ampyang 1.1000 m2 0.00 0.00

1 m2 Pekerjaan Pemasangan Batu Gilang Ex Nilai HSPK


2.01.01.05.02.022 m2 0.00
Jember (Beraturan) (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7520 Kg 1,225.00 14,396.20
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.062 Batu Gilang Ex Jember Beraturan 1.1000 m2 0.00 0.00

1 m2 Pekerjaan Pemasangan Batu Gilang Ex Nilai HSPK


2.01.01.05.02.023 m2 0.00
Jember (Tak Beraturan) (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7520 Kg 1,225.00 14,396.20
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.063 Batu Gilang Ex Jember Tak Beraturan 1.1000 m2 0.00 0.00

1 m2 Pekerjaan Pemasangan Batu Gilang Ex Nilai HSPK


2.01.01.05.02.024 m2 0.00
Cirebon (Simetris) (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7520 Kg 1,225.00 14,396.20
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.064 Batu Gilang Ex Cirebon Beraturan 1.1000 m2 0.00 0.00

1 m2 Pekerjaan Pemasangan Batu Gilang Ex Nilai HSPK


2.01.01.05.02.025 m2 0.00
Cirebon Asimetris (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7520 Kg 1,225.00 14,396.20
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.065 Batu Gilang Ex Cirebon Tak Beraturan 1.1000 m2 0.00 0.00

Nilai HSPK
2.01.01.05.02.026 1 m2 Pekerjaan Pemasangan Wall Paper m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0025 O.H 95,000.00 237.50
1.01.01.01.002 Kepala Tukang 0.0020 O.H 85,000.00 170.00
1.01.01.02.006 Tukang Cat 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.0200 O.H 70,000.00 1,400.00
1.01.02.10.119 Wall Paper 2.4000 m' 33,961.80 81,508.32
1.01.02.06.057 Perekat (Lem Kayu Fox) 0.2000 kg 19,000.00 3,800.00

1 m2 Pekerjaan Pasangan Dinding Marmer 100 x Nilai HSPK


2.01.01.05.02.027 m2 0.00
100 cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 Kg 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 12.4400 kg 1,225.00 15,239.00
1.01.02.01.006 Pasir Pasang 0.0250 m3 266,109.00 6,652.73
1.01.02.03.014 Semen Warna 0.6500 Kg 15,000.00 9,750.00
1.01.02.02.004 Marmer 100 x 100 cm 1.0600 m2 0.00 0.00
1.01.02.07.072 Paku 12 cm 3.0000 bh 18,000.00 54,000.00

1 m2 Pekerjaan pasangan dinding bata pelapis 3 Nilai HSPK


2.01.01.05.02.028 m' 0.00
cm x 7 cm x 24 cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0500 O.H 95,000.00 4,750.00
1.01.01.01.002 Kepala Tukang 0.0500 Kg 85,000.00 4,250.00
1.01.01.01.002 Tukang Batu 0.5000 O.H 85,000.00 42,500.00
1.01.01.02.023 Pekerja 1.0000 O.H 70,000.00 70,000.00
1.01.02.03.001 Semen Portland 12.4400 kg 1,225.00 15,239.00
1.01.02.01.006 Pasir Pasang 0.0250 m3 266,109.00 6,652.73
1.01.02.03.014 Semen Warna 2.7500 Kg 15,000.00 41,250.00
1.01.02.02.056 Bata Pelapis 63.0000 bh 0.00 0.00

Nilai HSPK
2.01.01.05.02.029 1 m2 Pekerjaan pasangan Batu Paras m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 Kg 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7500 kg 1,225.00 14,393.75
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.053 Batu Paras 1.1000 m2 0.00 0.00

Nilai HSPK
2.01.01.05.02.030 1 m2 Pekerjaan pasangan Batu Tempel Hitam m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0350 O.H 95,000.00 3,325.00
1.01.01.01.002 Kepala Tukang 0.0350 Kg 85,000.00 2,975.00
1.01.01.01.002 Tukang Batu 0.3500 O.H 85,000.00 29,750.00
1.01.01.02.023 Pekerja 0.7000 O.H 70,000.00 49,000.00
1.01.02.03.001 Semen Portland 11.7500 kg 1,225.00 14,393.75
1.01.02.01.006 Pasir Pasang 0.0350 m3 266,109.00 9,313.82
1.01.02.02.060 Batu Tempel Hitam 1.1000 m2 131,931.00 145,124.10

Nilai HSPK
2.01.01.05.02.031 1 m2 Pemasangan Lantai Vynil uk. 30 x30 cm m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0080 O.H 95,000.00 760.00
1.01.01.01.002 Kepala Tukang 0.0150 Kg 85,000.00 1,275.00
1.01.01.01.002 Tukang Batu 0.1500 O.H 85,000.00 12,750.00
1.01.01.02.023 Pekerja 0.1500 O.H 70,000.00 10,500.00
1.01.02.10.117 Vynil 11.8700 Bh 88,275.00 1,047,824.25
1.01.02.06.056 Lem 0.3500 kg 28,000.00 9,800.00

Nilai HSPK
2.01.01.05.02.032 1 m2 Pemasangan Floor Harderner m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0060 O.H 95,000.00 570.00
1.01.01.01.002 Kepala Tukang 0.0120 Kg 85,000.00 1,020.00
1.01.01.01.002 Tukang Batu 0.1200 O.H 85,000.00 10,200.00
1.01.01.02.023 Pekerja 0.1200 O.H 70,000.00 8,400.00
1.01.02.10.001 Floor Harderner 5.0000 Kg 0.00 0.00

Nilai HSPK
2.01.01.05.02.033 1 m’ Pemasangan plint kayu tebal 2 cm lebar 10 cm m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0060 O.H 95,000.00 570.00
1.01.01.01.002 Kepala Tukang 0.0120 Kg 85,000.00 1,020.00
1.01.01.01.002 Tukang Batu 0.1200 O.H 85,000.00 10,200.00
1.01.01.02.023 Pekerja 0.1200 O.H 70,000.00 8,400.00
1.01.02.13.003 Papan Kayu Kelas I 0.0030 m3 25,145,000.00 75,435.00
1.01.02.07.065 Paku/ Sekrup 5 cm 0.0500 kg 16,000.00 800.00

2.01.01.06 PEKERJAAN KAYU, KUNCI, PENGGANTUNG DAN KACA


2.01.01.06.01 Pekerjaan Kayu Kusen, Pintu, Jendela, Dan Jalusi
Nilai HSPK
2.01.01.06.01.001 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Jati m3 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.3500 O.H 95,000.00 33,250.00
1.01.01.01.002 Kepala Tukang 2.1000 O.H 85,000.00 178,500.00
1.01.01.02.004 Tukang Kayu 21.0000 O.H 75,000.00 1,575,000.00
1.01.01.02.023 Pekerja 7.0000 O.H 70,000.00 490,000.00
1.01.02.13.001 Kayu Jati Balok 1.1000 m3 21,480,250.00 23,628,275.00
1.01.02.07.072 Paku Biasa 1.2500 kg 18,000.00 22,500.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.02.06.054 Lem Kayu 1.0000 kg 12,000.00 12,000.00

Nilai HSPK
2.01.01.06.01.002 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Kamper m3 11,661,250.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.3500 O.H 95,000.00 33,250.00
1.01.01.01.002 Kepala Tukang 2.1000 O.H 85,000.00 178,500.00
1.01.01.02.004 Tukang Kayu 21.0000 O.H 75,000.00 1,575,000.00
1.01.01.02.023 Pekerja 7.0000 O.H 70,000.00 490,000.00
1.01.02.13.009 Kayu Kamper Balok 1.1000 m3 8,500,000.00 9,350,000.00
1.01.02.07.072 Paku Biasa 1.2500 kg 18,000.00 22,500.00
1.01.02.06.054 Lem Kayu 1.0000 kg 12,000.00 12,000.00
OVERHEAD + PROFIT 10% 1,166,125.00

Nilai HSPK
2.01.01.06.01.003 1 m3 Pekerjaan Kusen Pintu/ Jendela Kayu Kruing m3 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.3500 O.H 95,000.00 33,250.00
1.01.01.01.002 Kepala Tukang 2.1000 O.H 85,000.00 178,500.00
1.01.01.02.004 Tukang Kayu 21.0000 O.H 75,000.00 1,575,000.00
1.01.01.02.023 Pekerja 7.0000 O.H 70,000.00 490,000.00
1.01.02.13.017 Kayu Kruing Balok 1.1000 m3 6,200,971.00 6,821,068.10
1.01.02.07.072 Paku Biasa 1.2500 kg 18,000.00 22,500.00
1.01.02.06.054 Lem Kayu 1.0000 kg 12,000.00 12,000.00

Nilai HSPK
2.01.01.06.01.004 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Jati m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0180 O.H 95,000.00 1,710.00
1.01.01.01.002 Kepala Tukang 0.1050 O.H 85,000.00 8,925.00
1.01.01.02.004 Tukang Kayu 1.0500 O.H 75,000.00 78,750.00
1.01.01.02.023 Pekerja 0.3500 O.H 70,000.00 24,500.00
1.01.02.13.003 Kayu Jati Papan 0.0400 m3 25,145,000.00 1,005,800.00
1.01.02.07.072 Paku Biasa 0.0500 kg 18,000.00 900.00

Nilai HSPK
2.01.01.06.01.005 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Kamper m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0180 O.H 95,000.00 1,710.00
1.01.01.01.002 Kepala Tukang 0.1050 O.H 85,000.00 8,925.00
1.01.01.02.004 Tukang Kayu 1.0500 O.H 75,000.00 78,750.00
1.01.01.02.023 Pekerja 0.3500 O.H 70,000.00 24,500.00
1.01.02.13.010 Kayu Kamper Papan 0.0400 m3 9,000,000.00 360,000.00
1.01.02.07.072 Paku Biasa 0.0500 kg 18,000.00 900.00

Nilai HSPK
2.01.01.06.01.006 1 m2 Pekerjaan Pasang Pintu Klamp Kayu Kruing m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0180 O.H 95,000.00 1,710.00
1.01.01.01.002 Kepala Tukang 0.1050 O.H 85,000.00 8,925.00
1.01.01.02.004 Tukang Kayu 1.0500 O.H 75,000.00 78,750.00
1.01.01.02.023 Pekerja 0.3500 O.H 70,000.00 24,500.00
1.01.02.13.018 Kayu Kruing Papan 0.0400 m3 6,764,700.50 270,588.02
1.01.02.07.072 Paku Biasa 0.0500 kg 18,000.00 900.00

Nilai HSPK
2.01.01.06.01.007 1 m2 Pekerjaan Pasang Daun Pintu Panil Kayu Jati m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0500 O.H 95,000.00 4,750.00
1.01.01.01.002 Kepala Tukang 0.3000 O.H 85,000.00 25,500.00
1.01.01.02.004 Tukang Kayu 3.0000 O.H 75,000.00 225,000.00
1.01.01.02.023 Pekerja 1.0000 O.H 70,000.00 70,000.00
1.01.02.13.003 Kayu Jati Papan 0.0400 m3 25,145,000.00 1,005,800.00
1.01.02.06.054 Lem Kayu 0.5000 kg 12,000.00 6,000.00

Nilai HSPK
2.01.01.06.01.008 1 m2 Pekerjaan Pasang Pintu Panil Kayu Kamper m2 717,000.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0500 O.H 110,000.00 5,500.00
1.01.01.01.002 Kepala Tukang 0.3000 O.H 95,000.00 28,500.00
1.01.01.02.004 Tukang Kayu 3.0000 O.H 90,000.00 270,000.00
1.01.01.02.023 Pekerja 1.0000 O.H 80,000.00 80,000.00
1.01.02.13.010 Kayu Kamper Papan 0.0400 m3 8,100,000.00 324,000.00
1.01.02.06.054 Lem Kayu 0.5000 kg 18,000.00 9,000.00
OVERHEAD + PROFIT 10% 71,700.00

2.01.01.06.02. Pekerjaan Kunci, Penggantung, dan Kaca


2.01.01.06.02. Pekerjaan Kunci Dan Kaca
Nilai HSPK
2.01.01.06.02.006 Pekerjaan Pemasangan 1 Buah Engsel Pintu Buah 50,410.00
(Dibulatkan):
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.001 Mandor 0.0008 O.H 110,000.00 88.00
1.01.01.01.002 Kepala Tukang 0.0150 O.H 95,000.00 1,425.00
1.01.01.02.004 Tukang Kayu 0.1500 O.H 90,000.00 13,500.00
1.01.01.02.023 Pekerja 0.0150 O.H 80,000.00 1,200.00
1.01.02.12.009 Engsel Pintu Kuningan 3" 1.0000 Stel 29,610.00 29,610.00
OVERHEAD + PROFIT 10% 4,582.30

Pekerjaan Pemasangan 1 Buah Engsel Jendela Nilai HSPK


2.01.01.06.02.007 Buah 18,640.00
Kupu-Kupu (Dibulatkan):
1.01.01.01.001 Mandor 0.0005 O.H 110,000.00 55.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.0100 O.H 80,000.00 800.00
1.01.02.12.008 Engsel Jendela Kupu-Kupu Kuningan 2.5" 1.0000 Stel 7,830.00 7,830.00

Nilai HSPK
2.01.01.06.02.008 Pekerjaan Pemasangan 1 Buah Engsel Angin Buah 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0005 O.H 95,000.00 47.50
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.1000 O.H 70,000.00 7,000.00
1.01.02.12.013 Engsel Angin Kuningan 2" 1.0000 Stel 48,150.00 48,150.00

Pekerjaan Pemasangan 1 Buah Engsel Hidrolis Nilai HSPK


2.01.01.06.02.009 Buah 0.00
Pintu Almunium (Dibulatkan):
1.01.01.01.002 Kepala Tukang 0.0130 O.H 85,000.00 1,105.00
1.01.01.02.004 Tukang Kayu 0.1250 O.H 75,000.00 9,375.00
1.01.02.12.014 Engsel Hidrolis Pintu Alluminium 1.0000 Stel 0.00 0.00

Nilai HSPK
2.01.01.06.02.010 Pekerjaan Pemasangan Spring Knip Stel 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0005 O.H 95,000.00 47.50
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.1000 O.H 70,000.00 7,000.00
1.01.02.12.053 Spring Knip 1.0000 buah 26,750.00 26,750.00

Nilai HSPK
2.01.01.06.02.011 Pemasangan 1 Buah Kait Angin Buah 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0005 O.H 95,000.00 47.50
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.1400 O.H 75,000.00 10,500.00
1.01.01.02.023 Pekerja 0.0800 O.H 70,000.00 5,600.00
1.01.02.12.031 Kait Angin 1.0000 Buah 9,630.00 9,630.00

Nilai HSPK
2.01.01.06.02.012 Pemasangan 1 Buah Door Closer Buah 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0030 O.H 95,000.00 285.00
1.01.01.01.002 Kepala Tukang 0.0500 O.H 85,000.00 4,250.00
1.01.01.02.004 Tukang Kayu 0.5000 O.H 75,000.00 37,500.00
1.01.01.02.023 Pekerja 0.0500 O.H 70,000.00 3,500.00
1.01.02.12.002 Door Closer 1.0000 Buah 259,314.50 259,314.50

Nilai HSPK
2.01.01.06.02.013 Pemasangan 1 Buah Kunci Slot Buah 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0010 O.H 95,000.00 95.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.0200 O.H 70,000.00 1,400.00
1.01.02.12.036 Kunci Slot 1.0000 Buah 33,865.50 33,865.50

Nilai HSPK
2.01.01.06.02.014 Pemasangan 1 Buah Door Holder Buah 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0030 O.H 95,000.00 285.00
1.01.01.01.002 Kepala Tukang 0.0500 O.H 85,000.00 4,250.00
1.01.01.02.004 Tukang Kayu 0.5000 O.H 75,000.00 37,500.00
1.01.01.02.023 Pekerja 0.0500 O.H 70,000.00 3,500.00
1.01.02.12.004 Door Holder 1.0000 Buah 16,959.50 16,959.50

Nilai HSPK
2.01.01.06.02.015 Pemasangan 1 Buah Door Stopper Buah 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.0100 O.H 70,000.00 700.00
1.01.02.12.003 Door Stopper 1.0000 Buah 54,142.00 54,142.00

Nilai HSPK
2.01.01.06.02.016 Pekerjaan Pemasangan 1 Buah Rel Pintu Dorong Buah 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0030 O.H 95,000.00 285.00
1.01.01.01.002 Kepala Tukang 0.0600 O.H 85,000.00 5,100.00
1.01.01.02.004 Tukang Kayu 0.6000 O.H 75,000.00 45,000.00
1.01.01.02.023 Pekerja 0.0600 O.H 70,000.00 4,200.00
1.01.02.12.049 Rel Pintu Dorong 1.0000 buah 481,500.00 481,500.00

Nilai HSPK
2.01.01.06.02.017 Pemasangan 1 m2 Kaca Tebal 3 Mm m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0008 O.H 95,000.00 76.00
1.01.01.01.002 Kepala Tukang 0.0150 O.H 85,000.00 1,275.00
1.01.01.02.004 Tukang Kayu 0.1500 O.H 75,000.00 11,250.00
1.01.01.02.023 Pekerja 0.0150 O.H 70,000.00 1,050.00
1.01.02.04.009 Kaca Tebal 3 Mm 1.1000 m2 100,000.00 110,000.00
1.01.02.04.020 Sealant 0.1667 Tube 40,000.00 6,668.00

Nilai HSPK
2.01.01.06.02.018 Pemasangan 1 m2 Kaca Tebal 5 Mm m2 135,970.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0008 O.H 110,000.00 88.00
1.01.01.01.002 Kepala Tukang 0.0150 O.H 95,000.00 1,425.00
1.01.01.02.004 Tukang Kayu 0.1500 O.H 90,000.00 13,500.00
1.01.01.02.023 Pekerja 0.0150 O.H 80,000.00 1,200.00
1.01.02.04.010 Kaca Tebal 5 Mm 1.1000 buah 90,810.00 99,891.00
1.01.02.04.020 Sealant 0.1667 Tube 45,000.00 7,501.50
OVERHEAD + PROFIT 10% 12,360.55

Nilai HSPK
2.01.01.06.02.019 Pemasangan 1 m2 Kaca Tebal 8 Mm m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0009 O.H 95,000.00 85.50
1.01.01.01.002 Kepala Tukang 0.0170 O.H 85,000.00 1,445.00
1.01.01.02.004 Tukang Kayu 0.1700 O.H 75,000.00 12,750.00
1.01.01.02.023 Pekerja 0.0170 O.H 70,000.00 1,190.00
1.01.02.04.011 Kaca Tebal 8 Mm 1.1000 buah 190,000.00 209,000.00
1.01.02.04.020 Sealant 0.2334 Tube 40,000.00 9,336.00

Nilai HSPK
2.01.01.06.02.019a Pemasangan 1 m2 Kaca Tempered Tebal 12 Mm m2 813,790.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0009 O.H 95,000.00 85.50
1.01.01.01.002 Kepala Tukang 0.0170 O.H 85,000.00 1,445.00
1.01.01.02.004 Tukang Kayu 0.1700 O.H 75,000.00 12,750.00
1.01.01.02.023 Pekerja 0.0170 O.H 70,000.00 1,190.00
1.01.02.04.013 Kaca Tempered Tebal 12 Mm 1.1000 buah 650,000.00 715,000.00
1.01.02.04.020 Sealant 0.2334 Tube 40,000.00 9,336.00
OVERHEAD + PROFIT 10% 73,980.65

Nilai HSPK
2.01.01.06.02.020 1 Buah Pemasangan Grendel Biasa (Besar) Buah 48,810.00
(Dibulatkan):
1.01.01.02.004 Tukang Kayu 0.1200 O.H 90,000.00 10,800.00
1.01.01.02.023 Pekerja 0.0600 O.H 80,000.00 4,800.00
1.01.02.12.020 Grendel Biasa (Besar) 1.0000 Buah 33,210.00 33,210.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
2.01.01.07. PEK. KUDA-KUDA, RANGKA, PENUTUP ATAP, LANGIT-LANGIT DAN LISTPLANK
2.01.01.07.01. PEK. KUDA-KUDA DAN RANGKA ATAP
1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Jati Nilai HSPK
2.01.01.07.01.001 m3 0.00
Bentang 6 m (Dibulatkan):
1.01.01.01.001 Mandor 0.2000 O.H 95,000.00 19,000.00
1.01.01.01.002 Kepala Tukang 1.2000 O.H 85,000.00 102,000.00
1.01.01.02.004 Tukang Kayu 12.0000 O.H 75,000.00 900,000.00
1.01.01.02.023 Pekerja 4.0000 O.H 70,000.00 280,000.00
1.01.02.13.001 Kayu Jati Balok 1.1000 m3 21,480,250.00 23,628,275.00
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 5.6000 kg 18,000.00 100,800.00

1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Kamper Nilai HSPK


2.01.01.07.01.002 m3 11,024,650.00
Bentang 6 M (Dibulatkan):
1.01.01.01.001 Mandor 0.2000 O.H 95,000.00 19,000.00
1.01.01.01.002 Kepala Tukang 1.2000 O.H 85,000.00 102,000.00
1.01.01.02.004 Tukang Kayu 12.0000 O.H 75,000.00 900,000.00
1.01.01.02.023 Pekerja 4.0000 O.H 70,000.00 280,000.00
1.01.02.13.009 Kayu Kamper Balok 1.1000 m3 8,500,000.00 9,350,000.00
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 5.6000 kg 18,000.00 100,800.00

1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Kruing Nilai HSPK


2.01.01.07.01.003 m3 0.00
Bentang 6 M (Dibulatkan):
1.01.01.01.001 Mandor 0.2000 O.H 95,000.00 19,000.00
1.01.01.01.002 Kepala Tukang 1.2000 O.H 85,000.00 102,000.00
1.01.01.02.004 Tukang Kayu 12.0000 O.H 75,000.00 900,000.00
1.01.01.02.023 Pekerja 4.0000 O.H 70,000.00 280,000.00
1.01.02.13.017 Kayu Kruing Balok 1.1000 m3 6,200,971.00 6,821,068.10
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 5.6000 kg 18,000.00 100,800.00

1 m3 Pekerjaan Pasangan Kuda-Kuda Kayu Meranti Nilai HSPK


2.01.01.07.01.004 m3 4,974,650.00
Bentang 6 M (Dibulatkan):
1.01.01.01.001 Mandor 0.2000 O.H 95,000.00 19,000.00
1.01.01.01.002 Kepala Tukang 1.2000 O.H 85,000.00 102,000.00
1.01.01.02.004 Tukang Kayu 12.0000 O.H 75,000.00 900,000.00
1.01.01.02.023 Pekerja 4.0000 O.H 70,000.00 280,000.00
1.01.02.13.021 Kayu Meranti Balok 1.1000 m3 3,000,000.00 3,300,000.00
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 5.6000 kg 18,000.00 100,800.00

Nilai HSPK
2.01.01.07.01.005 1 m3 Pekerjaan Pemasangan Gording Kayu Jati m3 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.3350 O.H 95,000.00 31,825.00
1.01.01.01.002 Kepala Tukang 2.0100 O.H 85,000.00 170,850.00
1.01.01.02.004 Tukang Kayu 20.1000 O.H 75,000.00 1,507,500.00
1.01.01.02.023 Pekerja 6.7000 O.H 70,000.00 469,000.00
1.01.02.13.001 Kayu Jati Balok 1.1000 m3 21,480,250.00 23,628,275.00
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 3.0000 kg 18,000.00 54,000.00

Nilai HSPK
2.01.01.07.01.006 1 m3 Pekerjaan Pemasangan Gording Kayu Kamper m3 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.3350 O.H 95,000.00 31,825.00
1.01.01.01.002 Kepala Tukang 2.0100 O.H 85,000.00 170,850.00
1.01.01.02.004 Tukang Kayu 20.1000 O.H 75,000.00 1,507,500.00
1.01.01.02.023 Pekerja 6.7000 O.H 70,000.00 469,000.00
1.01.02.13.009 Kayu Kamper Balok 1.1000 m3 8,500,000.00 9,350,000.00
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 3.0000 kg 18,000.00 54,000.00

Nilai HSPK
2.01.01.07.01.007 1 m3 Pekerjaan Pemasangan Gording Kayu Kruing m3 9,327,100.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.3350 O.H 95,000.00 31,825.00
1.01.01.01.002 Kepala Tukang 2.0100 O.H 85,000.00 170,850.00
1.01.01.02.004 Tukang Kayu 20.1000 O.H 75,000.00 1,507,500.00
1.01.01.02.023 Pekerja 6.7000 O.H 70,000.00 469,000.00
1.01.02.13.017 Kayu Kruing Balok 1.1000 m3 6,200,971.00 6,821,068.10
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 3.0000 kg 18,000.00 54,000.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

Nilai HSPK
2.01.01.07.01.008 1 m3 Pekerjaan Pemasangan Gording Kayu Meranti m3 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.3350 O.H 95,000.00 31,825.00
1.01.01.01.002 Kepala Tukang 2.0100 O.H 85,000.00 170,850.00
1.01.01.02.004 Tukang Kayu 20.1000 O.H 75,000.00 1,507,500.00
1.01.01.02.023 Pekerja 6.7000 O.H 70,000.00 469,000.00
1.01.02.13.021 Kayu Meranti Balok 1.1000 m3 3,000,000.00 3,300,000.00
1.01.02.07.026 Besi Plat Strip 15.0000 Kg 18,190.00 272,850.00
1.01.02.07.072 Paku Biasa 3.0000 kg 18,000.00 54,000.00

1 m2 Pekerjaan Pasang Rangka Atap Genteng Nilai HSPK


2.01.01.07.01.009 m2 0.00
Kodok (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.1000 O.H 70,000.00 7,000.00
1.01.02.13.020 Kaso/Reng Kayu Kruing 0.0120 m3 4,791,674.00 57,500.09
1.01.02.07.072 Paku Biasa 0.1500 Kg 18,000.00 2,700.00

1 m2 Pekerjaan Pasang Rangka Atap Genteng Nilai HSPK


2.01.01.07.01.010 m2 114,010.00
Keramik (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.1000 O.H 70,000.00 7,000.00
1.01.02.13.020 Kaso Kruing 5X7 0.0140 m3 4,791,674.00 67,083.44
1.01.02.13.019 Reng Kruing 2X3 0.0036 m3 4,509,836.00 16,235.41
1.01.02.07.072 Paku Biasa 0.2500 Kg 18,000.00 4,500.00
OVERHEAD + PROFIT 10% 10,364.38
1 m2 Pekerjaan Pasang Rangka Atap Genteng Nilai HSPK
2.01.01.07.01.011 m2 0.00
Beton (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.1000 O.H 70,000.00 7,000.00
1.01.02.13.020 Kaso Kruing (5X7) Cm 0.0140 m3 4,791,674.00 67,083.44
1.01.02.13.019 Reng Kruing (3X4) Cm 0.0057 m3 4,509,836.00 25,706.07
1.01.02.07.072 Paku Biasa 0.2500 Kg 18,000.00 4,500.00

1 M2 Pemasangan Rangka Atap Galvalume Genteng Nilai HSPK


2.01.01.07.01.012 M2 64,670.00
Asbes/ Spandex (Dibulatkan):
1.01.01.01.001 Mandor 0.0500 Oh 95,000.00 4,750.00
1.01.01.01.002 Kepala Tukang 0.0100 Oh 85,000.00 850.00
1.01.01.02.002 Tukang Besi 0.1000 OH 75,000.00 7,500.00
1.01.01.02.023 Pekerja/Buruh Tak Terampil 0.1000 Oh 70,000.00 7,000.00
1.01.02.08.031 C-75, 0.8 0.1000 Batang 80,000.00 8,000.00
1.01.02.08.032 C-75, 0.6 0.1000 Batang 62,000.00 6,200.00
1.01.02.07.077 Baut (Screw Driver) 0.1000 Box 133,750.00 13,375.00
1.01.02.07.093 Dynabolt 1.6000 Buah 1,872.50 2,996.00
1.01.02.08.033 Reng Galvalume 0.1000 Batang 60,000.00 6,000.00
1.01.02.09.093 Talang Jurai 0.1240 m' 64,500.00 7,998.00

Nilai HSPK
2.01.01.07.01.013 1 M2 Pemasangan Reng Galvalume Mutu Tinggi M2 132,480.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0250 Oh 110,000.00 2,750.00
1.01.01.01.002 Kepala Tukang 0.0050 Oh 95,000.00 475.00
1.01.01.02.002 Tukang 0.2250 OH 90,000.00 20,250.00
1.01.01.02.023 Pekerja/Buruh Tak Terampil 0.1000 Oh 80,000.00 8,000.00
1.01.02.08.031 C-75, 0.8 0.2480 Batang 84,000.00 20,832.00
1.01.02.08.032 C-75, 0.6 0.3720 Batang 84,000.00 31,248.00
1.01.02.07.065 Paku Skrup 0.2000 Kg 16,200.00 3,240.00
1.01.02.07.093 Dynabolt 1.6000 Buah 1,350.00 2,160.00
1.01.02.08.033 Reng 110, 0,4 mm 0.9000 Batang 31,500.00 28,350.00
1.01.02.09.093 Talang Jurai 0.1240 m' 25,200.00 3,124.80
OVERHEAD + PROFIT 10% 12,042.98

2.01.01.07.02. Pekerjaan Penutup Atap


Nilai HSPK
2.01.01.07.02.006 1 m2 Pekerjaan Pasang Atap Genteng Beton m2 72,060.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0100 O.H 110,000.00 1,100.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.2000 O.H 80,000.00 16,000.00
1.01.02.09.042 Genteng Beton 11.0000 Buah 4,050.00 44,550.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.02.07.072 Paku Biasa 0.0300 kg 15,300.00 459.00

Nilai HSPK
1 m2 Pekerjaan Pasang Atap Genteng Keramik m2 74,560.00
(Dibulatkan):
Mandor 0.0100 O.H 31,500.00 315.00
Kepala Tukang 0.0100 O.H 25,200.00 252.00
Tukang Kayu 0.1000 O.H 0.00 0.00
Pekerja 0.2000 O.H 0.00 0.00
Genteng Keramik 14.5000 Buah 5,000.00 72,500.00
Paku Biasa 0.0300 kg 49,500.00 1,485.00

Nilai HSPK
1 m2 Pekerjaan Pasang Atap Genteng Kanmuri m2 65,420.00
(Dibulatkan):
Mandor 0.0100 O.H 75,000.00 750.00
Kepala Tukang 0.0100 O.H 70,000.00 700.00
Tukang Kayu 0.1000 O.H 3,263.50 326.35
Pekerja 0.2000 O.H 0.00 0.00
Genteng Kanmuri 14.0000 Buah 4,500.00 63,000.00
Paku Biasa 0.0300 kg 21,262.50 637.88

Nilai HSPK
2.01.01.07.02.007 1 m2 Pekerjaan Pasang Atap Genteng Metal m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0010 O.H 95,000.00 95.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 85,000.00 850.00
1.01.01.02.004 Tukang Kayu 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.2000 O.H 70,000.00 14,000.00
1.01.02.09.121 Genteng Metal 1.0200 Lembar 63,932.50 65,211.15
1.01.02.07.072 Paku Biasa 0.2000 kg 18,000.00 3,600.00

Nilai HSPK
2.01.01.07.02.008 Pemasangan 1 m2 atap genteng palentong kecil m2 0.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.1500 OH 70,000.00 10,500.00
1.01.01.02.004 Tukang kayu 0.0750 OH 75,000.00 5,625.00
1.01.01.01.002 Kepala tukang 0.0075 OH 85,000.00 637.50
1.01.01.01.001 Mandor 0.0080 OH 95,000.00 760.00
1.01.02.09.058 Genteng palentong 25.0000 buah 2,835.50 70,887.50

Pemasangan 1m2 atap genteng palentong Nilai HSPK


2.01.01.07.02.009 m2 0.00
besar/super (Dibulatkan):
1.01.01.02.023 Pekerja 0.1500 OH 70,000.00 10,500.00
1.01.01.02.004 Tukang kayu 0.0750 OH 75,000.00 5,625.00
1.01.01.01.002 Kepala tukang 0.0080 OH 85,000.00 680.00
1.01.01.01.001 Mandor 0.0080 OH 95,000.00 760.00
1.01.02.09.057 Genteng kodok 12.0000 buah 2,835.50 34,026.00

Nilai HSPK
2.01.01.07.02.010 1 m2 Pasang Atap Sirap Kayu m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0080 O.H 95,000.00 760.00
1.01.01.01.002 Kepala Tukang 0.0250 O.H 85,000.00 2,125.00
1.01.01.02.004 Tukang Kayu 0.2500 O.H 75,000.00 18,750.00
1.01.01.02.023 Pekerja 0.1660 O.H 70,000.00 11,620.00
1.01.02.09.075 Atap Sirap 30.0000 Lembar 3,210.00 96,300.00
1.01.02.07.072 Paku Biasa 0.2000 Kg 18,000.00 3,600.00

Nilai HSPK
2.01.01.07.02.011 Pemasangan 1 m2 Pemasangan atap alumunium m2 0.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.1500 OH 70,000.00 10,500.00
1.01.01.02.004 Tukang kayu 0.7500 OH 75,000.00 56,250.00
1.01.01.01.002 Kepala tukang 0.0800 OH 85,000.00 6,800.00
1.01.01.01.001 Mandor 0.0060 OH 95,000.00 570.00
1.01.02.09.106 Aluminium gel tebal 0,55 1.0500 Lbr 40,606.50 42,636.83
1.01.02.07.066 Paku hak panjang 15 cm 0.0200 Kg 22,149.00 442.98

Nilai HSPK
2.01.01.07.02.012 1 m2 Pemasangan alumunium foil/sisalation m2 0.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.1500 OH 70,000.00 10,500.00
1.01.01.02.004 Tukang kayu 0.0500 OH 75,000.00 3,750.00
1.01.01.01.002 Kepala tukang 0.0050 OH 85,000.00 425.00
1.01.01.01.001 Mandor 0.0080 OH 95,000.00 760.00
1.01.02.08.043 Aluminium foil 1.0500 M2 36,339.62 38,156.60

Nilai HSPK
2.01.01.07.02.013 1 m2 Pasang Atap Seng Gelombang m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0060 O.H 95,000.00 570.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.01.002 Kepala Tukang 0.0060 O.H 85,000.00 510.00
1.01.01.02.004 Tukang Kayu 0.0600 O.H 75,000.00 4,500.00
1.01.01.02.023 Pekerja 0.1200 O.H 70,000.00 8,400.00
1.01.02.09.085 Seng Gelombang 0.7000 Lembar 73,295.00 51,306.50
1.01.02.07.072 Paku Biasa 0.0200 Kg 18,000.00 360.00

Nilai HSPK
2.01.01.07.02.014 1 m2 Pekerjaan Pasang Atap Roof Light Fiber Glass m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0670 O.H 75,000.00 5,025.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.122 Roof Light Fiber Glass 0.6000 Lembar 139,100.00 83,460.00
1.01.02.07.072 Paku Biasa 0.0500 Kg 18,000.00 900.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.015 m2 0.00
Tebal 5 Mm (2,5 X 0,92) (Dibulatkan):
1.01.01.01.001 Mandor 0.0080 O.H 95,000.00 760.00
1.01.01.01.002 Kepala Tukang 0.0080 O.H 85,000.00 680.00
1.01.01.02.004 Tukang Kayu 0.0750 O.H 75,000.00 5,625.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.003 Asbes Gelombang Tb.5 Mm (2.5 X 0.92) 0.5000 Lembar 72,171.50 36,085.75
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.016 m2 0.00
Tebal 5 Mm (2 X 0,92) (Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0700 O.H 75,000.00 5,250.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.004 Asbes Gelombang Tb.5 Mm (2.00 X 0.92) 0.6000 Lembar 60,883.00 36,529.80
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.017 m2 0.00
Tebal 5 Mm (1,8 X 0,92) (Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0700 O.H 75,000.00 5,250.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.005 Asbes Gelombang Tb.5 Mm (1.8 X 0.92) 0.7500 Lembar 54,142.00 40,606.50
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.018 m2 0.00
Tebal 4 Mm (3 X 1,05) (Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0700 O.H 75,000.00 5,250.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.006 Asbes Gelombang Tb.4 Mm (3.00 X 1.05) 0.3500 Lembar 94,909.00 33,218.15
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.019 m2 0.00
Tebal 4 Mm (1,8 X 1,05) (Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0700 O.H 75,000.00 5,250.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.007 Asbes Gelombang Tb.4 Mm (1.80 X 1.05) 0.4200 Lembar 60,776.00 25,525.92
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.020 m2 0.00
Tebal 3 Mm (2,4 X 1,05) (Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0670 O.H 75,000.00 5,025.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.010 Asbes Gelombang Tb.3 Mm (2.40 X 1.05) 0.4400 Lembar 47,401.00 20,856.44
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.021 m2 0.00
Tebal 3 Mm (2,1 X 1,05) (Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0670 O.H 75,000.00 5,025.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.011 Asbes Gelombang Tb.3 Mm (2.10 X 1.05) 0.5100 Lembar 42,853.50 21,855.29
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

1 m2 Pekerjaan Pasang Atap Asbes Gelombang Nilai HSPK


2.01.01.07.02.022 m2 0.00
Tebal 3 Mm (1,5 X 1,05) (Dibulatkan):
1.01.01.01.001 Mandor 0.0070 O.H 95,000.00 665.00
1.01.01.01.002 Kepala Tukang 0.0070 O.H 85,000.00 595.00
1.01.01.02.004 Tukang Kayu 0.0670 O.H 75,000.00 5,025.00
1.01.01.02.023 Pekerja 0.1400 O.H 70,000.00 9,800.00
1.01.02.09.013 Asbes Gelombang Tb.3Mm (1.5 X 1.05) 0.8000 Lembar 33,865.50 27,092.40
1.01.02.07.058 Paku Pancing 60X230 0.1200 kg 43,000.00 5,160.00

Nilai HSPK
2.01.01.07.02.023 1 m' Pekerjaan Pasang Wuwung Genteng Palentong m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0020 O.H 95,000.00 190.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.4000 O.H 70,000.00 28,000.00
1.01.02.03.001 Semen Portland 8.0000 Kg 1,225.00 9,800.00
1.01.02.01.006 Pasir Pasang 0.0320 m3 266,109.00 8,515.49
1.01.02.09.036 Wuwung Genteng Palentong 5.0000 Buah 5,350.00 26,750.00

Nilai HSPK
2.01.01.07.02.024 1 m’ Pemasangan bubung genteng palentong besar m' 0.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.4000 OH 70,000.00 28,000.00
1.01.01.02.004 Tukang kayu 0.2000 OH 75,000.00 15,000.00
1.01.01.01.002 Kepala tukang 0.0200 OH 85,000.00 1,700.00
1.01.01.01.001 Mandor 0.0020 OH 95,000.00 190.00
1.01.02.09.035 Bubung genteng palentong besar 4.0000 buah 17,976.00 71,904.00
1.01.02.03.001 Semen Portland 8.0000 Kg 1,225.00 9,800.00
1.01.02.01.006 Pasir pasang 0.0320 M3 266,109.00 8,515.49

Nilai HSPK
2.01.01.07.02.025 1 m' Pekerjaan Pasang Wuwung Genteng Kodok m' 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0020 O.H 95,000.00 190.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.4000 O.H 70,000.00 28,000.00
1.01.02.03.001 Semen Portland 8.0000 Kg 1,225.00 9,800.00
1.01.02.01.006 Pasir Pasang 0.0320 m3 266,109.00 8,515.49
1.01.02.09.033 Wuwung Genteng Kodok 5.0000 Buah 2,835.50 14,177.50

1 m' Pekerjaan Pasang Wuwung Genteng Karang Nilai HSPK


2.01.01.07.02.026 m' 0.00
Pilang Ex. Nglayur (Dibulatkan):
1.01.01.01.001 Mandor 0.0020 O.H 95,000.00 190.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.4000 O.H 70,000.00 28,000.00
1.01.02.03.001 Semen Portland 8.0000 Kg 1,225.00 9,800.00
1.01.02.01.006 Pasir Pasang 0.0320 m3 266,109.00 8,515.49
1.01.02.09.030 Wuwung Karang Pilang Ex. Nglayur 5.0000 Buah 9,362.50 46,812.50

1 m' Pekerjaan Pasang Bubungan Genteng Nilai HSPK


2.01.01.07.02.027 m' 187,620.00
Keramik/ Glazzur (Dibulatkan):
1.01.01.01.001 Mandor 0.0020 O.H 95,000.00 190.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.4000 O.H 70,000.00 28,000.00
1.01.02.03.001 Semen Portland 8.0000 Kg 1,225.00 9,800.00
1.01.02.01.025 Pasir Pasang 0.0320 m3 160,000.00 5,120.00
1.01.02.09.037 Genteng Bubungan Glazzur 5.0000 Buah 22,149.00 110,745.00
OVERHEAD + PROFIT 10% 17,055.50

Nilai HSPK
2.01.01.07.02.028 1 m' Pekerjaan Pasang Nok Genteng Beton m' 107,560.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0200 O.H 110,000.00 2,200.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 95,000.00 1,900.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
1.01.01.02.023 Pekerja 0.4000 O.H 80,000.00 32,000.00
1.01.02.09.027 Nok Genteng Beton 3.5000 Buah 6,750.00 23,625.00
1.01.02.07.072 Paku Biasa 0.0500 Kg 15,300.00 765.00
1.01.02.03.001 Semen Portland 10.8000 Kg 1,282.50 13,851.00
1.01.02.01.006 Pasir Pasang 0.0320 m3 135,000.00 4,320.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.02.03.014 Semen Warna 1.0000 Kg 10,890.00 10,890.00

Nilai HSPK
2.01.01.07.02.038 1 m2 Pekerjaan Water Proofing Coating m2 116,600.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.2000 O.H 80,000.00 16,000.00
1.01.01.02.008 Tukang Batu 0.6000 O.H 90,000.00 54,000.00
1.01.02.06.036 Waterproofing Coating 1.0000 kg 31,500.00 31,500.00
1.01.02.06.052 Kuas 3 " 0.2500 bh 18,000.00 4,500.00
OVERHEAD + PROFIT 10% 10,600.00
2.01.01.07.04 Pekerjaan Listplank
Nilai HSPK
2.01.01.07.04.002 1 m' Pekerjaan Pasang Listplank 2/20 m' 45,330.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 110,000.00 550.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 95,000.00 1,900.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 90,000.00 18,000.00
1.01.01.02.023 Pekerja 0.1000 O.H 80,000.00 8,000.00
1.01.02.13.010 Woodplank ( 2x20x400) 1.0000 m1 15,345.00 15,345.00
1.01.02.07.072 Paku Biasa 0.1000 Kg 15,300.00 1,530.00

1 m2 Pemasangan atap pelana rangka atap baja Nilai HSPK


2.01.01.08.01.004 m2 258,700.00
canai dingin profil C75 (Dibulatkan):
1.01.01.02.023 Pekerja 0.7340 OH 80,000.00 58,720.00
1.01.01.02.002 Tukang besi 0.7340 OH 90,000.00 66,060.00
1.01.01.01.002 Kepala tukang 0.0730 OH 95,000.00 6,935.00
1.01.01.01.001 Mandor 0.0730 OH 110,000.00 8,030.00
Roof Bottom/Reng Galvalum 5.1000 m' 8,500.00 43,350.00
1.01.02.08.032 Baja ringan canai dingin C75 1.0000 btg 75,600.00 75,600.00
Peralatan 10.0000 % 0.00 0.00

1 m2 Pemasangan atap jurai rangka atap baja canai Nilai HSPK


2.01.01.08.01.005 m2 0.00
dingin profil C75 (Dibulatkan):
1.01.01.02.023 Pekerja 0.7604 OH 70,000.00 53,228.00
1.01.01.02.002 Tukang besi 0.7604 OH 75,000.00 57,030.00
1.01.01.01.002 Kepala tukang 0.0760 OH 85,000.00 6,460.00
1.01.01.01.001 Mandor 0.0380 OH 95,000.00 3,610.00
1.01.02.08.032 Baja ringan canai dingin C75 4.0500 btg 62,000.00 251,100.00
Peralatan 10.0000 % 0.00 0.00

Nilai HSPK
2.01.01.08.01.006 100 Kg Pekerjaan Perakitan Besi Profil Kg 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 95,000.00 475.00
1.01.01.01.002 Kepala Tukang 0.0010 O.H 85,000.00 85.00
1.01.01.02.002 Tukang Besi 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.1000 O.H 70,000.00 7,000.00
1.01.02.06.082 Solar 1.0000 ltr 12,733.00 12,733.00
1.01.02.06.083 Minyak Pelumas 0.1000 ltr 55,265.50 5,526.55

Nilai HSPK
2.01.01.08.01.007 1 Cm Pekerjaan Pengelasan Dengan Las Listrik Kg 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0002 O.H 95,000.00 19.00
1.01.01.01.002 Kepala Tukang 0.0002 O.H 85,000.00 17.00
1.01.01.02.002 Tukang Besi 0.0020 O.H 75,000.00 150.00
1.01.01.02.023 Pekerja 0.0040 O.H 70,000.00 280.00
1.01.02.07.126 Kawat Las 0.0400 kg 43,816.50 1,752.66
1.01.02.06.082 Solar Industri 0.0300 liter 12,733.00 381.99
1.01.02.06.083 Minyak Pelumas 0.0040 liter 55,265.50 221.06
1.01.02.22.079 Sewa Alat Pengelasan 0.0170 Jam 58,957.00 1,002.27

1 m2 Pemasangan Rangka Besi Hollow 1.40.40.2


Nilai HSPK
2.01.01.08.01.008 Mm, Modul 60.120 Dinding Partisi Penutup m2 129,680.00
(Dibulatkan):
Kalsiboard
1.01.01.01.001 Mandor 0.0130 O.H 95,000.00 1,235.00
1.01.01.01.002 Kepala Tukang 0.0250 O.H 85,000.00 2,125.00
1.01.01.02.002 Tukang Besi 0.2500 O.H 75,000.00 18,750.00
1.01.01.02.023 Pekerja 0.2500 O.H 70,000.00 17,500.00
1.01.02.08.030 Rangka Metal Hollow 40.40.2 Mm 0.8750 Btg 34,989.00 30,615.38
1.01.02.09.116 Kalsiboard 0.8600 Lembar 69,122.00 59,444.92
Accesorries 0.2500 Set 0.00

1 m2 Pemasangan rangka besi hollow 1x40.40.mm, Nilai HSPK


2.01.01.08.01.009 m2 134,870.00
modul 60 x 60 cm, untuk plafon (Dibulatkan):
1.01.01.01.001 Mandor 0.0180 O.H 95,000.00 1,710.00
1.01.01.01.002 Kepala Tukang 0.0350 O.H 85,000.00 2,975.00
1.01.01.02.002 Tukang Besi 0.3500 O.H 75,000.00 26,250.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.01.02.023 Pekerja 0.3500 O.H 70,000.00 24,500.00
1.01.02.08.030 Rangka Hollow 40.40.2 Mm 1.7500 Btg 34,989.00 61,230.75
Kalsibord 1.0000 m² 13,000.00 13,000.00
Paku sekrup 0.1500 kg 18,000.00 2,700.00
Kawat penggantung 5.0000 m' 500.00 2,500.00

Nilai HSPK
2.01.01.08.01.010 1 m2 Pekerjaan Pemasangan Rolling Door Besi m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0600 O.H 95,000.00 5,700.00
1.01.01.01.002 Kepala Tukang 0.1200 O.H 85,000.00 10,200.00
1.01.01.02.002 Tukang Besi 1.2000 O.H 75,000.00 90,000.00
1.01.01.02.023 Pekerja 1.2000 O.H 70,000.00 84,000.00
1.01.02.07.264 Rolling Door Besi Komplit 1.0000 m2 588,500.00 588,500.00

Nilai HSPK
2.01.01.08.01.011 1 m2 Pekerjaan Pemasangan Pintu Besi Lipat m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0220 O.H 95,000.00 2,090.00
1.01.01.01.002 Kepala Tukang 0.0440 O.H 85,000.00 3,740.00
1.01.01.02.002 Tukang Besi 0.4400 O.H 75,000.00 33,000.00
1.01.01.02.023 Pekerja 0.4400 O.H 70,000.00 30,800.00
1.01.02.07.265 Pintu Besi Lipat 1.0000 m2 1,402,663.00 1,402,663.00

Nilai HSPK
2.01.01.08.01.012 1 m2 Pekerjaan Pasang Jendela Nako Dan Teralis m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0010 O.H 95,000.00 95.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.2000 O.H 70,000.00 14,000.00
1.01.02.04.019 Jendela Nako 15 X 70 (Rangka + Kaca 5 Mm) 1.0000 m2 27,659.50 27,659.50
1.01.02.07.065 Paku Skrup 0.0400 dus 16,000.00 640.00
1.01.02.07.027 Besi Strip 1.1667 Batang 9,416.00 10,985.65

Nilai HSPK
2.01.01.08.01.013 1 m2 Pekerjaan Pasang Terali Besi Strip m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0830 O.H 95,000.00 7,885.00
1.01.01.01.002 Kepala Tukang 0.1670 O.H 85,000.00 14,195.00
1.01.01.02.009 Tukang Las 1.6700 O.H 75,000.00 125,250.00
1.01.01.02.023 Pekerja 1.6700 O.H 70,000.00 116,900.00
1.01.02.07.024 Besi Strip (Besi Teralis Jendela) 6.1770 Kg 8,667.00 53,536.06
1.01.02.07.097 Pengelasan 27.0800 cm 2,889.00 78,234.12

1 m' Pekerjaan Pasang Talang Datar/Jurai Seng Bjls Nilai HSPK


2.01.01.08.01.014 m' 0.00
28 Lebar 90 (Dibulatkan):
1.01.01.01.001 Mandor 0.0010 O.H 95,000.00 95.00
1.01.01.01.002 Kepala Tukang 0.0200 O.H 85,000.00 1,700.00
1.01.01.02.004 Tukang Kayu 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.2000 O.H 70,000.00 14,000.00
1.01.02.09.091 Seng Plat 3" X 6" Bjls 28 1.0500 m' 30,500.00 32,025.00
1.01.02.07.072 Paku Biasa 0.0150 Kg 18,000.00 270.00
1.01.02.13.014 Kayu Borneo Papan 0.0190 m3 6,400,000.00 121,600.00

Nilai HSPK
2.01.01.08.01.015 1 m' Pekerjaan Pasang Talang Miring Seng Bjls 28 m' 163,170.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0013 O.H 95,000.00 123.50
1.01.01.01.002 Kepala Tukang 0.0250 O.H 85,000.00 2,125.00
1.01.01.02.004 Tukang Kayu 0.4000 O.H 75,000.00 30,000.00
1.01.01.02.023 Pekerja 0.1500 O.H 70,000.00 10,500.00
1.01.02.09.096 Seng Plat 3" X 6" Bjls 28 0.5000 Lembar 68,000.00 34,000.00
1.01.02.07.072 Paku Biasa 0.0150 Kg 18,000.00 270.00
1.01.02.13.014 Kayu Borneo Papan 0.0096 m3 6,400,000.00 61,440.00
1.01.02.06.022 Meni Besi 0.2500 Kg 39,483.00 9,870.75
OVERHEAD + PROFIT 10% 14,832.93

1 m' Pekerjaan Pasang Talang 1/2 Lingkaran D-15 Nilai HSPK


2.01.01.08.01.016 m' 0.00
Cm Seng Bjls 30 Lebar 45 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0080 O.H 95,000.00 760.00
1.01.01.01.002 Kepala Tukang 0.0300 O.H 85,000.00 2,550.00
1.01.01.02.004 Tukang Kayu 0.3000 O.H 75,000.00 22,500.00
1.01.01.02.023 Pekerja 0.1500 O.H 70,000.00 10,500.00
1.01.02.09.096 Seng Plat 3" X 6" Bjls 1.0500 Lembar 68,000.00 71,400.00
1.01.02.07.072 Paku Biasa 0.0100 Kg 18,000.00 180.00
1.01.02.07.026 Besi Strip 0.5000 Kg 18,190.00 9,095.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

1 m2 Pekerjaan Pemasangan Pagar Model Brc/Pmg Nilai HSPK


2.01.01.08.01.017 m2 0.00
A (Dibulatkan):
1.01.01.02.002 Tukang Besi 0.0170 O.H 75,000.00 1,275.00
1.01.01.01.002 Tukang Batu 1.0500 O.H 85,000.00 89,250.00
1.01.01.02.023 Pekerja 1.0500 O.H 70,000.00 73,500.00
1.01.02.07.230 Pagar Brc 1.0000 Unit 922,447.00 922,447.00

1 Unit Pekerjaan Pemasangan Pasang Tiang Pagar Nilai HSPK


2.01.01.08.01.018 Unit 0.00
Model Pmg 2" Tinggi 1,5 M (Dibulatkan):
1.01.01.02.002 Tukang Besi 0.5000 O.H 75,000.00 37,500.00
1.01.01.02.023 Pekerja 0.5000 O.H 70,000.00 35,000.00
1.01.02.07.232 Pipa Besi Ø 2" (Steinnless) 1.0000 Batang 236,256.00 236,256.00

1 Unit Pekerjaan Pasang 1 Unit Daun Pintu Swing Nilai HSPK


2.01.01.08.01.019 Unit 0.00
Ganda Type Brc/Pmg Uk. (1,2M X 3M) (Dibulatkan):
1.01.01.02.002 Tukang Besi 1.0500 O.H 75,000.00 78,750.00
1.01.01.02.023 Pekerja 1.0500 O.H 70,000.00 73,500.00
1.01.02.07.239 Pintu Swing Ganda Brc/Pmg Ukuran 1.20 X 3.00 1.0000 unit 1,411,116.00 1,411,116.00

Nilai HSPK
2.01.01.08.01.020 1 m' Railing Tangga Besi Hollow m' 47,120.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0080 O.H 110,000.00 880.00
1.01.01.01.002 Kepala Tukang 0.0080 O.H 95,000.00 760.00
1.01.01.02.002 Tukang Besi 0.0750 O.H 90,000.00 6,750.00
1.01.01.02.023 Pekerja 0.1500 O.H 80,000.00 12,000.00
1.01.02.08.028 Besi Hollow 40.40 1.0345 Btg 18,000.00 18,621.00
1.01.02.07.082 Mur baut 6.0000 bh 1,350.00 8,100.00
1.01.02.06.020 Cat besi 1.0000 Kg 0.00 0.00

1 m2 Kanopi rangka besi hollow & Penutup atap Nilai HSPK


2.01.01.08.01.021 m2 419,520.00
Polycarbonate (Dibulatkan):
1.01.01.01.001 Mandor 0.0080 O.H 95,000.00 760.00
1.01.01.01.002 Kepala Tukang 0.0080 O.H 85,000.00 680.00
1.01.01.02.002 Tukang Besi 0.0750 O.H 75,000.00 5,625.00
1.01.01.02.023 Pekerja 0.1500 O.H 70,000.00 10,500.00
1.01.02.08.028 Besi Hollow 40.40 1.7242 Btg 214,000.00 368,978.80
1.01.02.09.109 Polycarbonate t. 8 mm 0.0404 m2 172,537.50 6,970.52
1.01.02.07.063 Paku payung 6.0000 bh 4,333.50 26,001.00

Nilai HSPK
2.01.01.08.01.022 1 m2 Pembuatan & Pemasangan Pagar Besi Hollow m2 535,140.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0520 O.H 95,000.00 4,940.00
1.01.01.01.002 Kepala Tukang 0.1050 O.H 85,000.00 8,925.00
1.01.01.02.003 Tukang Besi Konstruksi 1.0500 O.H 75,000.00 78,750.00
1.01.01.02.023 Pekerja 1.0500 O.H 70,000.00 73,500.00
1.01.02.08.028 Besi Hollow 40.40 1.7242 Btg 214,000.00 368,978.80
1.01.02.07.129 Kawat Bendrat 0.0020 Roll 22,000.00 44.00

Nilai HSPK
2.01.01.08.01.023 1 m2 Pembuatan & Pemasangan Pagar Besi Tempa m2 0.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0520 O.H 95,000.00 4,940.00
1.01.01.01.002 Kepala Tukang 0.1050 O.H 85,000.00 8,925.00
1.01.01.02.003 Tukang Besi Konstruksi 1.0500 O.H 75,000.00 78,750.00
1.01.01.02.023 Pekerja 1.0500 O.H 70,000.00 73,500.00
1.01.02.07.053 Besi tempa 1.2000 m2 267,500.00 321,000.00
1.01.02.07.129 Kawat Bendrat 0.0020 Roll 22,000.00 44.00
2.01.01.08.02. Pekerjaan Aluminium
Nilai HSPK
2.01.01.08.02.001 1 m' Pekerjaan Kusen Alluminium 4" m' 71,620.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0021 O.H 110,000.00 231.00
1.01.01.01.002 Kepala Tukang 0.0043 O.H 95,000.00 408.50
1.01.01.02.004 Tukang Kayu 0.0430 O.H 90,000.00 3,870.00
1.01.01.02.023 Pekerja 0.0430 O.H 80,000.00 3,440.00
1.01.02.07.252 Profil Alluminium 1.1000 m 49,500.00 54,450.00
1.01.02.07.067 Skrup Fixer 0.0080 kg 540.00 4.32
1.01.02.04.020 Sealant 0.0600 Tube 45,000.00 2,700.00
OVERHEAD + PROFIT 10% 6,510.38

1 m2 Pekerjaan Pasang Pintu Kaca Rangka Nilai HSPK


2.01.01.08.02.004 m2 512,020.00
Alluminium (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 110,000.00 550.00
1.01.01.01.002 Kepala Tukang 0.0090 O.H 95,000.00 855.00
1.01.01.02.004 Tukang Kayu 0.0850 O.H 90,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0850 O.H 80,000.00 6,800.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN
1.01.02.07.277 Profil Alluminium (Slimar ) 4.4000 m 87,300.00 384,120.00
1.01.02.04.010 Kaca Polos 5 Mm 1.1000 m2 90,810.00 99,891.00
1.01.02.04.020 Sealant 0.2700 Tube 45,000.00 12,150.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

1 m2 Pekerjaan Pemasangan Pintu Alluminium Nilai HSPK


2.01.01.08.02.005 m2 1,668,420.00
Strip Lebar 8 Cm (Dibulatkan):
1.01.01.01.001 Mandor 0.0042 O.H 110,000.00 462.00
1.01.01.01.002 Kepala Tukang 0.0085 O.H 95,000.00 807.50
1.01.01.02.004 Tukang Kayu 0.0850 O.H 90,000.00 7,650.00
1.01.01.02.023 Pekerja 0.0850 O.H 80,000.00 6,800.00
1.01.02.07.277 Profil Alluminium (Slimar ) 4.4000 m 87,300.00 384,120.00
1.01.02.07.273 Allumunium Strip 14.6000 m 76,500.00 1,116,900.00
OVERHEAD + PROFIT 10% 151,673.95

2.01.01.09. PEKERJAAN FINISHING


2.01.01.09.01. Pekerjaan Pengecatan
1 m2 Pekerjaan Pengecatan Tembok Baru 1 Lapis
Nilai HSPK
2.01.01.09.01.013 Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup m2 13,320.00
(Dibulatkan):
Interior
1.01.01.01.001 Mandor 0.0030 O.H 110,000.00 330.00
1.01.01.01.002 Kepala Tukang 0.0063 O.H 95,000.00 598.50
1.01.01.02.006 Tukang Cat 0.0630 O.H 90,000.00 5,670.00
1.01.01.02.023 Pekerja 0.0200 O.H 80,000.00 1,600.00
1.01.02.06.031 Plamir Tembok 0.1000 Kg 16,920.00 1,692.00
1.01.02.06.001 Cat Tembok Dasar 0.1000 Kg 22,500.00 2,250.00
1.01.02.06.001 Cat Tembok Penutup (5 Kg) 0.0520 Galon 22,500.00 1,170.00

Nilai HSPK
2.01.01.09.01.015 1 m2 Pengecatan Tembok Exterior m2 65,390.00
(Dibulatkan):
1.01.01.02.023 Pekerja 0.2000 O.H 80,000.00 16,000.00
1.01.01.02.006 Tukang Cat 0.3000 O.H 90,000.00 27,000.00

1.01.02.06.014 Cat Tembok Dulux Weathershield 0.0400 Galon 275,000.00 11,000.00

1.01.02.06.001 Cat Dasar (Alkali) 0.1600 kg 22,500.00 3,600.00


1.01.02.06.048 Ampelas 0.5000 lbr 3,420.00 1,710.00
1.01.02.06.053 Rol Cat 0.0100 bh 13,500.00 135.00
OVERHEAD + PROFIT 10% 5,944.50

Nilai HSPK
2.01.01.09.01.023 1 m2 Pekerjaan Pengecatan Plafond m2 23,560.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0040 O.H 110,000.00 440.00
1.01.01.01.002 Kepala Tukang 0.0060 O.H 95,000.00 570.00
1.01.01.02.006 Tukang Cat 0.0600 O.H 90,000.00 5,400.00
1.01.01.02.023 Pekerja 0.0800 O.H 80,000.00 6,400.00
1.01.02.06.051 Kapi 0.0500 Buah 9,000.00 450.00
1.01.02.06.031 Plamur Tembok 0.1000 Kg 0.00 0.00
1.01.02.06.003 Cat Tembok 0.0480 Galon 130,500.00 6,264.00
1.01.02.06.047 Kertas Gosok 0.5000 lembar 3,420.00 1,710.00
1.01.02.06.052 Kuas Cat 0.0100 Buah 18,000.00 180.00
OVERHEAD + PROFIT 10% 2,141.40
2.01.01.09.02. Pekerjaan Sanitair
Nilai HSPK
2.01.01.09.02.001 Pekerjaan Pemasangan 1 Buah Kloset Duduk Buah 4,091,670.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.1600 O.H 110,000.00 17,600.00
1.01.01.01.002 Kepala Tukang 0.0010 O.H 95,000.00 95.00
1.01.01.01.002 Tukang Batu 1.1000 O.H 90,000.00 99,000.00
1.01.01.02.023 Pekerja 3.3000 O.H 80,000.00 264,000.00
1.01.02.11.013 Kloset Duduk Merk Toto 1.0000 Buah 3,150,000.00 3,150,000.00
Peralatan (6% Dari Harga Bahan) 0.0600 Set 3,150,000.00 189,000.00
OVERHEAD + PROFIT 10% 371,969.50

Pekerjaan Pemasangan 1 Buah Bak Cuci Piring Nilai HSPK


2.01.01.09.02.009 Buah 601,590.00
Stainless Steel Dan Accessories (Dibulatkan):
1.01.01.01.001 Mandor 0.0150 O.H 110,000.00 1,650.00
1.01.01.01.002 Kepala Tukang 0.0300 O.H 95,000.00 2,850.00
1.01.01.01.002 Tukang Batu 0.3000 O.H 90,000.00 27,000.00
1.01.01.02.023 Pekerja 0.0300 O.H 80,000.00 2,400.00
1.01.02.11.007 Bak Cuci Stainless Steel 1.0000 Buah 468,000.00 468,000.00
1.01.02.11.024 Water Drain + Asesories 1.0000 set 45,000.00 45,000.00
OVERHEAD + PROFIT 10% 54,690.00

Nilai HSPK
2.01.01.09.02.010 Pekerjaan Pemasangan 1 Buah Floor Drain Buah 45,950.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 110,000.00 550.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.01.002 Tukang Batu 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.0100 O.H 80,000.00 800.00
1.01.02.11.010 Floor Drain + Accessories 1.0000 buah 34,650.00 34,650.00
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

Pekerjaan Pemasangan 1 Buah Bak Kontrol Nilai HSPK


2.01.01.09.02.012 Buah 6,874,200.00
Pasangan Batu Bata Uk. 45 X 45 Cm, Tinggi 50 Cm (Dibulatkan):

1.01.01.01.001 Mandor 0.0160 O.H 110,000.00 1,760.00


1.01.01.01.002 Kepala Tukang 0.0110 O.H 95,000.00 1,045.00
1.01.01.01.002 Tukang Batu 1.1500 O.H 90,000.00 103,500.00
1.01.01.02.023 Pekerja 3.2000 O.H 80,000.00 256,000.00
1.01.02.05.001 Batu Bata 70.0000 buah 585.00 40,950.00
1.01.02.03.001 Semen Portland 77.0000 Zak 1,282.50 98,752.50
1.01.02.01.025 Pasir Pasang 0.1300 m3 135,000.00 17,550.00
1.01.02.01.026 Kerikil Beton 0.0200 m3 189,000.00 3,780.00
1.01.02.07.001 Besi Beton 2.6000 Kg 9,450.00 24,570.00
1.01.02.01.025 Pasir Beton 0.0900 m3 166,500.00 14,985.00
Pekerjaan Pemasangan 1 Buah Bak Kontrol Nilai HSPK
Buah 1,042,450.00
Groundig (Dibulatkan):
Mandor 0.0160 O.H 110,000.00 1,760.00
Kepala Tukang 0.0110 O.H 95,000.00 1,045.00
Tukang Batu 1.1500 O.H 90,000.00 103,500.00
Pekerja 3.2000 O.H 80,000.00 256,000.00
Batu Bata 70.0000 buah 585.00 40,950.00
Semen Portland 77.0000 Kg 1,282.50 98,752.50
Pasir Pasang 0.1300 m3 135,000.00 17,550.00
Kerikil Beton 0.0200 m3 189,000.00 3,780.00
Besi Beton 2.6000 Kg 9,450.00 24,570.00
Pasir Beton 0.0900 m3 166,500.00 14,985.00
Kabel BCC 35mm 1.0000 m' 38,500.00 38,500.00
Stickrood / copperood 5/8" tembaga 1.0000 buah 156,250.00 156,250.00
Busbar tembaga 250x50x8 1.0000 buah 250,000.00 250,000.00
Isolator + baut 1.0000 buah 18,000.00 18,000.00
Klamp buaya 1.0000 buah 16,800.00 16,800.00
Nilai HSPK
Pekerjaan Pemasangan Penangkal Petir Buah 2,085,060.00
(Dibulatkan):
Splitz 2 AIP 1.0000 buah 2,000,000.00 2,000,000.00
Pipa Galvanist 0.3333 btg 25,000.00 8,333.33
Prevectron 1.0000 buah 30,000.00 30,000.00
Kepala Tukang 0.0050 O.H 95,000.00 475.00
Tukang Listrik 0.5000 O.H 85,000.00 42,500.00
Pekerja 0.0500 O.H 75,000.00 3,750.00

OVERHEAD + PROFIT 10% 56,289.25


Pekerjaan Pemasangan 1 Buah Kran Air Ø 3/4" Atau Nilai HSPK
2.01.01.09.02.014 Buah 294,880.00
1/2" (Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 110,000.00 550.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.02.008 Tukang Pipa 0.1000 O.H 90,000.00 9,000.00
1.01.01.02.023 Pekerja 0.0100 O.H 80,000.00 800.00
1.01.02.11.021 Kran Air Ex. Omco 1.0000 Buah 22,320.00 22,320.00
1.01.02.11.025 Seal Tape 1.0000 roll 234,450.00 234,450.00
OVERHEAD + PROFIT 10% 26,807.00

Nilai HSPK
2.01.01.09.02.015 Pekerjaan Pemasangan 1 Buah Kran Shower Buah 265,850.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0050 O.H 110,000.00 550.00
1.01.01.01.002 Kepala Tukang 0.0100 O.H 95,000.00 950.00
1.01.01.02.008 Tukang Pipa 0.1000 O.H 75,000.00 7,500.00
1.01.01.02.023 Pekerja 0.0100 O.H 80,000.00 800.00
1.01.02.11.022 Kran Air Shower 1.0000 Buah 21,600.00 21,600.00
1.01.02.11.025 Seal Tape 1.0000 roll 234,450.00 234,450.00

Nilai HSPK
2.01.01.09.02.024 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3/4" m' 25,220.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0018 O.H 110,000.00 198.00
1.01.01.01.002 Kepala Tukang 0.0060 O.H 95,000.00 570.00
1.01.01.02.008 Tukang Pipa 0.0600 O.H 75,000.00 4,500.00
1.01.01.02.023 Pekerja 0.0360 O.H 80,000.00 2,880.00
1.01.02.17.002 Pipa Pvc Aw Ø 3/4" 0.2000 Batang 5,400.00 1,080.00
1.01.02.11.025 Perlengkapan 0.0584 Set 234,450.00 13,691.88
OVERHEAD + PROFIT 10% 2,291.99
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

Nilai HSPK
2.01.01.09.02.029 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 3" m' 36,290.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0041 O.H 110,000.00 451.00
1.01.01.01.002 Kepala Tukang 0.0135 O.H 95,000.00 1,282.50
1.01.01.02.008 Tukang Pipa 0.1350 O.H 75,000.00 10,125.00
1.01.01.02.023 Pekerja 0.0810 O.H 80,000.00 6,480.00
1.01.02.17.007 Pipa Pvc Aw Ø 3" 0.2000 Batang 21,262.50 4,252.50
1.01.02.11.025 Perlengkapan 0.0584 Set 234,450.00 13,691.88

Nilai HSPK
2.01.01.09.02.030 1 m' Pekerjaan Pasang Pipa Pvc Type Aw Ø 4" m' 37,940.00
(Dibulatkan):
1.01.01.01.001 Mandor 0.0041 O.H 110,000.00 451.00
1.01.01.01.002 Kepala Tukang 0.0135 O.H 95,000.00 1,282.50
1.01.01.02.008 Tukang Pipa 0.1350 O.H 75,000.00 10,125.00
1.01.01.02.023 Pekerja 0.0810 O.H 80,000.00 6,480.00
1.01.02.17.008 Pipa Pvc Aw Ø 4" 0.2000 Batang 29,520.00 5,904.00
1.01.02.11.025 Perlengkapan 0.0584 Set 234,450.00 13,691.88

2.01.01.09.06 Instalasi Listrik


Nilai HSPK
2.01.01.09.06.001 Pemasangan 1 Titik Stop Kontak Titik 198,840.00
(Dibulatkan):
1.01.01.01.002 Kepala Tukang 0.0050 O.H 95,000.00 475.00
1.01.01.02.007 Tukang Listrik 0.5000 O.H 75,000.00 37,500.00
1.01.01.02.023 Pekerja 0.0500 O.H 80,000.00 4,000.00
1.01.02.16.001 Kabel Nya 1 X 2,5 Ex. Supreme 15.0000 m' 8,100.00 121,500.00
1.01.02.16.081 Pipa Pralon 5/8 0.2000 Batang 7,200.00 1,440.00
1.01.02.16.049 Stop Kontak Ex. Broco 1.0000 Buah 14,670.00 14,670.00
1.01.02.16.082 T Doos Pvc 1.0000 Buah 1,170.00 1,170.00
OVERHEAD + PROFIT 10% 18,075.50
KODE BARANG URAIAN KEGIATAN KOEF SAT HARGA SATUAN

Pemasangan 1 Titik Lampu (Menggunakan Kabel Nilai HSPK


2.01.01.09.06.002 Titik 237,520.00
Nya) (Dibulatkan):
1.01.01.01.002 Kepala Tukang 0.0500 O.H 95,000.00 4,750.00
1.01.01.02.007 Tukang Listrik 0.5000 O.H 75,000.00 37,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 80,000.00 24,000.00
1.01.02.16.001 Kabel Nya 1 X 2,5 Ex. Supreme 15.0000 m' 8,100.00 121,500.00
1.01.02.16.081 Pipa Pralon 5/8 1.0000 Batang 7,200.00 7,200.00
1.01.02.16.043 Saklar Ex. Broco 1.0000 Buah 12,330.00 12,330.00
1.01.02.16.066 Fiting Plafond Ex. Broco 1.0000 Buah 29,070.00 29,070.00
1.01.02.16.082 T Doos Pvc 1.0000 Buah 1,170.00 1,170.00

Pemasangan 1 Titik Lampu (Menggunakan Kabel Nilai HSPK


2.01.01.09.06.003 Titik 277,040.00
Nym) (Dibulatkan):
1.01.01.01.002 Kepala Tukang 0.0500 O.H 85,000.00 4,250.00
1.01.01.02.007 Tukang Listrik 0.5000 O.H 75,000.00 37,500.00
1.01.01.02.023 Pekerja 0.3000 O.H 70,000.00 21,000.00
1.01.02.16.043 Saklar Ex. Broco 1.0000 Buah 15,000.00 15,000.00
1.01.02.16.003 Kabel Nym 2 X 2,5 Ex. Supreme 7.5000 m' 19,000.00 142,500.00
1.01.02.16.081 Pipa Pralon 5/8 1.0000 Batang 16,500.00 16,500.00
1.01.02.16.082 T Doos Pvc 1.0000 Buah 1,300.00 1,300.00
1.01.02.16.066 Fiting Plafon 1.0000 Buah 13,803.00 13,803.00
OVERHEAD + PROFIT 10% 25,185.30

Nilai HSPK
2.01.01.09.06.004 Pekerjaan Pemasangan Saklar Tunggal Per Titik Titik 35,380.00
(Dibulatkan):
1.01.01.01.002 Kepala Tukang 0.0500 O.H 95,000.00 4,750.00
1.01.01.02.007 Tukang Listrik 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.0010 O.H 80,000.00 80.00
1.01.02.16.043 Saklar Tunggal Ex. Broco 1.0000 Buah 12,330.00 12,330.00
OVERHEAD + PROFIT 10% 3,216.00

Nilai HSPK
2.01.01.09.06.005 Pekerjaan Pemasangan Saklar Ganda Per Titik Titik 38,450.00
(Dibulatkan):
1.01.01.01.002 Kepala Tukang 0.0500 O.H 95,000.00 4,750.00
1.01.01.02.007 Tukang Listrik 0.2000 O.H 75,000.00 15,000.00
1.01.01.02.023 Pekerja 0.0010 O.H 80,000.00 80.00
1.01.02.16.042 Saklar Ganda Ex. Broco 1.0000 Buah 15,120.00 15,120.00
OVERHEAD + PROFIT 10% 3,495.00

Nilai HSPK
2.01.01.09.06.009 1 Buah Pemasangan Lampu LED 9 Watt Buah 33,750.00
(Dibulatkan):
1.01.01.01.002 Kepala Tukang 0.0050 O.H 95,000.00 475.00
1.01.01.02.007 Tukang Listrik 0.0200 O.H 75,000.00 1,500.00
1.01.01.02.023 Pekerja 0.0100 O.H 80,000.00 800.00
1.01.02.16.022 Lampu LED 9 Watt 1.0000 Buah 27,900.00 27,900.00
OVERHEAD + PROFIT 10% 3,067.50

Nilai HSPK
2.01.01.09.06.012 1 Titik Pemasangan Box Panel Titik 814,220.00
(Dibulatkan):
1.01.01.01.002 Kepala Tukang 1.0000 O.H 95,000.00 95,000.00
1.01.01.02.007 Tukang Listrik 1.0000 O.H 75,000.00 75,000.00
1.01.01.02.023 Pekerja 0.5000 O.H 80,000.00 40,000.00
1.01.02.16.075 Box panel PVC isi 4 MCB 1.0000 bh 198,000.00 198,000.00
1.01.02.16.045 MCB Thermis 10-16 A 2.0000 bh 63,879.00 127,758.00
1.01.02.16.047 MCB Thermis 4 - 10 Amp 2.0000 bh 43,228.00 86,456.00
1.01.02.16.005 Kabel NYM 3 x 2,5 mm2 6.0000 m 32,000.00 192,000.00
DAFTAR HARGA SATUAN BAHAN
No. URAIAN SATUAN HARGA SATUAN (Rp.)

1 Pasir pasang/Pasir urug m3 135,000.00


2 Pasir beton m3 166,500.00
3 Sirtu m3 76,500.00
4 Tanah urug m3 58,500.00
5 Batu bata merah kelas I bh 585.00
6 Semen PC (Gresik) @ 40 kg. kg 1,282.50
7 Semen putih kg 2,250.00
8 Semen berwarna kg 10,890.00
9 Batu pecah 20/20 cm. m3 126,000.00
10 Batu belah 15/20 cm. m3 166,500.00
11 Batu cor/koral beton 2/3 cm. m3 189,000.00
12 Besi beton polos kg 9,450.00
13 Kawat ikat beton kg 11,700.00
14 Besi beugel/baut 25 cm. f 12 mm. bj 5,940.00
15 Besi plat strip kg 17,460.00
16 Fixer skrup bh 540.00
17 Kayu Sengon Papan m3 787,500.00
18 Kayu Sengon 5/7 m3 1,285,714.29
19 Kayu kamper balok 8/12 cm. (Mutu Kayu Kelas II) m3 6,750,000.00
20 Kayu kamper usuk 5/7 cm. (Mutu Kayu Kelas II) m3 6,750,000.00
21 Kayu kamper reng 2/3 cm. (Mutu Kayu Kelas II) m3 6,750,000.00
22 Kayu kamper papan (Mutu Kayu Kelas II) m3 8,100,000.00
23 Kayu kruing balok 8/12 cm. (Mutu Kayu Kelas III) m3 4,320,000.00
24 Kayu kruing usuk 5/7 cm. (Mutu Kayu Kelas III) m3 4,320,000.00
25 Kayu kruing reng 2/3 cm. (Mutu Kayu Kelas III) m3 4,320,000.00
26 Kayu kruing papan (Mutu Kayu Kelas III) m3 4,500,000.00
27 Kayu meranti balok 8/12 cm. (Mutu Kayu Kelas III) m3 3,240,000.00
28 Kayu meranti usuk 5/7 cm. (Mutu Kayu Kelas III) m3 3,240,000.00
29 Kayu meranti reng 3/5 cm. (Mutu Kayu Kelas III) m3 3,240,000.00
30 Kayu meranti papan (Mutu Kayu Kelas III) m3 3,240,000.00
31 Kayu meranti bekisting (Mutu Kayu Kelas III) m3 3,240,000.00
32 Kayu balau usuk 5/7 cm. (Mutu Kayu Kelas II) m3 7,650,000.00
33 Kayu balau reng 2/3 cm. (Mutu Kayu Kelas II) m3 7,650,000.00
34 List kayu profil m' 5,400.00
35 Kayu bakar m3 112,203.00
36 Bambu f 10-12 cm. pj. 6 m. bt 16,740.00
37 Woodplank (20 x 400 x 1) cm lbr 15,345.00
38 Woodplank (20 x 400 x 1) cm lbr 61,380.00
39 Woodplank (30 x 400 x 1) cm lbr 63,000.00
40 Triplek 122x244x9 mm. lbr 112,680.00
41 Eternit gresik m2 14,580.00
42 Asbes gelombang bsr. (3,05x1,05) tb. 5 mm setara Gresik lbr 111,420.00
43 Asbes gelombang kcl. (3,05x1,05) tb. 4 mm setara Gresik lbr 86,670.00
44 Asbes wuwung gelombang bsr. 5 mm. psg 71,460.00
45 Seng datar BJLS 30 (0,9x1,0) m. lbr 26,730.00
46 Genteng kodok (ex. Trenggalek) bj 2,070.00
47 Genteng wuwung kodok (ex. Trenggalek ) bj 2,700.00
48 Genteng Kanmuri bj 4,500.00
49 Genteng beton bh 4,050.00
50 Genteng wuwung beton bh 6,750.00
51 Paku biasa kg 15,300.00
52 Paku pancing kg 18,000.00
53 Paku asbes/ulir bh 270.00
54 Paku skrup kg 16,200.00
55 Keramik Uk. 50x50 m2 94,500.00
56 Glass blok bh 18,000.00
57 Roster beton cetak uk.12x11x60cm bh 10,800.00
58 Tegel keramik uk. 20 x 20 cm. m2 36,000.00
59 Tegel keramik uk. 30 x 30 cm. m2 49,500.00
60 Tegel keramik uk. 40 x 40 cm. m2 63,000.00
61 Tegel keramik uk. 20 x 40 cm. m2 76,500.00
62 Pipa PVC 1/2" Maspion AW m' 4,680.00
63 Pipa PVC 3/4" Maspion AW m' 5,400.00
64 Pipa PVC 1" Maspion AW m' 7,200.00
65 Pipa PVC 1,5" Maspion AW m' 14,040.00
66 Pipa PVC 2" Maspion D m' 11,025.00
67 Pipa PVC 3" Maspion D m' 21,262.50
68 Pipa PVC 4" Maspion D m' 29,520.00
69 Pipa PVC 5" Maspion D m' 61,380.00
70 Keni PVC 1/2" bh 1,080.00
71 Keni PVC 3/4" bh 1,620.00
72 Keni PVC 2" bh 4,950.00
73 Keni PVC 3" bh 8,460.00
74 Keni PVC 4" bh 14,220.00
75 Keni PVC 5" bh 27,720.00
76 Klem pipa PVC bh 10,350.00
77 Kaca polos tb. 3 mm. m2 80,910.00
78 Kaca polos tb. 5 mm. m2 90,810.00
79 Kaca ray band tb. 5 mm. m2 107,910.00
80 Kaca nako krepyak dan kerangka m2 64,350.00
81 Cat kayu emco kg 63,000.00
82 Cat meni cap pedang kg 36,000.00
83 Cat Tembok Galon 130,500.00
84 Cat tembok (Vinilex)/sejenis kg 22,500.00
85 Cat plincute (Avian)/sejenis kg 53,460.00
86 Cat Tembok Dulux Weathershield Galon 247,500.00
87 Plamir tembok kg 16,920.00
88 Plamir kayu kg 22,500.00
89 Thinner B (minyak cat) lt 16,200.00
90 Politur lt 52,920.00
91 Lem (Rajawali) bks 11,700.00
92 Lem kayu (Fox) kg 35,190.00
93 Kertas gosok lbr 3,420.00
94 Engsel Jendela stl 7,830.00
95 Engsel pintu stl 29,610.00
96 Grendel bh 24,030.00
97 Grendel kuningan/krom bh 33,210.00
98 Grendel tanam bh 33,480.00
99 Kunci tanam 808 bh 11,880.00
100 Kunci tanam km/wc bh 37,620.00
101 Kunci tanam (Kuda Terbang) bh 57,420.00
102 Kunci selot bh 103,950.00
103 Hak angin bj 12,240.00
104 kran shower bh 21,600.00
105 Kloset Duduk Merk Toto bh 3,150,000.00
106 Bak Cuci Stainless Steel bh 468,000.00
107 Water Drain + Asesories bh 45,000.00
108 Closet jongkok porselin (INA) bh 125,820.00
109 Kran air bh 22,320.00
110 TBA/isolasi rol 4,680.00
111 Watermur bh 17,100.00
112 Sifon wasser set 124,740.00
113 Floor drain bh 34,650.00
114 Sumur peresap bh 26,482.50
115 Fitting plafon set 29,070.00
116 Pipa Pralon 5/8 btg 7,200.00
117 T dos PVC set 1,170.00
118 Isolator bh 14,850.00
119 Stop kontak (Broco) bh 14,670.00
120 Skakelar tunggal (Broco) bh 12,330.00
121 Zekering SPA 60 A bh 29,700.00
122 MCB Thermis 10-16 A bh 40,500.00
123 MCB Thermis 4 - 10 Amp bh 31,500.00
124 Kabel NYM 3 x 2,5 mm2 m' 9,720.00
125 Panel box 290 x 30 cm bh 198,000.00
126 Lampu TL 20 W komplit (Philips) bh 63,540.00
127 Lampu Tl 40 W komplit (Philips) bh 78,390.00
128 Lampu LED 9 Watt bh 27,900.00
129 Lampu pijar bh 19,800.00
130 Kabel NYA 500 V 1x2,5 mm. m' 5,940.00
131 Kabel NYA 450-750 V 1x1,5 mm. m' 6,480.00
132 Kabel NYA 450-750 V 1x2,5 mm. m' 8,100.00
133 Pompa air Nasional GP 125 JB l/dt bh 1,435,500.00
134 Pompa air Gold Star 10 KPOa 185 l/dt bh 1,584,000.00
135 Pompa tangan bh 198,000.00
136 Premium (industri) ltr 12,420.00
137 Minyak solar (industri) ltr 12,375.00
138 Minyak tanah (industri) ltr 12,870.00
139 Minyak bakar (industri) ltr 11,430.00
140 Olie (Meditran SX 15W/40)/setara ltr 32,670.00
141 Olie (Mesran Super)/setara ltr 32,670.00
142 Residu ltr 1,980.00
143 Minyak bekisting ltr 6,570.00
144 Sabun cream kg 7,470.00
145 Kuas 4" eterna bh 19,350.00
146 Seal Tape unit 234,450.00
147 Pipa galvanis 2.5" (BSA) roll 688,545.00
148 Formite/penjaga jarak begesting bh 18,000.00
149 Skakelar ganda (Broco) bh 15,120.00
150 Cerlak ltr 42,120.00
151 Gypsum board (120 x 240) cm tbl. 9 mm setara Elephant lbr 64,350.00
152 List gypsum profil 10 cm. m' 8,910.00
153 Tepung Gypsum kg 3,150.00
154 Lampu SL 20 watt (phillips) bh 32,400.00
155 Hollow 4 x 4 mm tebal 1 mm m' 18,000.00
156 Air ltr 225.00
157 Sealent Tb 45,000.00
158 Dolken Kayu Gelam Dia 8-10 Cm, Pjg 4 M btg -
159 Reng 110, 0,4 mm btg 31,500.00
160 Baja ringan canai dingin C75 btg 75,600.00
161 Waterproofing Coating kg 31,500.00
162 Mur baut bh 1,350.00
163 Cat besi Kg -
164 Profil Alluminium m' 49,500.00
165 Allumunium Strip m' 76,500.00
166 Profil Alluminium (Slimar ) m' 87,300.00
167 Rol Cat bh 13,500.00
168 Kapi bh 9,000.00
169 Kuas 3 " bh 18,000.00
170 Talang Galvalum 30x60 m' 25,200.00
171 Dynabolt 8mm Bh 1,350.00
172 Besi Plat Strip kg 17,820.00
173 Pipa PVC 4" btg 271,800.00
174 Elbow 4" bh 37,980.00
175 Tee Y 4" bh 126,990.00
176 Clean Out 4" bh 20,610.00
177 Socket 4" bh 12,780.00
178 Elbow Radius 4" bh 37,980.00
179 Pipa PVC 3" btg 88,560.00
180 Elbow 3" bh 11,520.00
181 Tee Y 3" bh 23,400.00
182 Socket 3" bh 7,110.00
183 Pipa PVC 2" btg -
184 Elbow 2" bh -
185 Pipa PVC 1" bh 36,270.00
186 Tee 1/2" bh 4,860.00
187 Socket 1/2" bh 2,610.00
188 Pipa PVC 3/4" btg 23,850.00
189 Pipa PVC 3/4" btg -
190 Pipa PVC 1/2" btg 19,530.00
191 Elbow 1/2" bh 1,620.00
192 Socket Reducer 1" X 1/2" bh 1,890.00
193 Socket Reducer 3/4" X 1" bh 2,430.00
194 Tee Reducer 1" X 1/2" bh 1,890.00
195 Lem Pipa klg 36,810.00
196 Ball Valve PVC 1/2" bh 135,000.00
197 Floor Drain 3" bh 45,000.00
198 Seal Tape roll 3,240.00
199 Elbow drat dalam kuningan PVC 1/2" bh 7,380.00
200 Food Trap ( Grease Trape ) set 1,125,000.00
HARGA SATUAN UPAH TENAGA KERJA

No. URAIAN SATUAN HARGA SATUAN (Rp.)

1 Mandor org/hr 110,000.00


2 Kepala Tukang Batu org/hr 95,000.00
3 Kepala Tukang Kayu org/hr 95,000.00
4 Kepala Tukang Cat org/hr 95,000.00
5 Kepala Tukang Gali org/hr 95,000.00
6 Kepala Tukang Besi org/hr 95,000.00
7 Kepala Tukang Politur org/hr 95,000.00
8 Kepala Tukang Pipa org/hr 95,000.00
9 Kepala Tukang Listrik org/hr 95,000.00
10 Kepala Tukang Bongk. Kayu org/hr 95,000.00
11 Tukang Batu org/hr 90,000.00
12 Tukang Kayu org/hr 90,000.00
13 Tukang Cat org/hr 90,000.00
14 Tukang Gali org/hr 90,000.00
15 Tukang Besi org/hr 90,000.00
16 Tukang Politur org/hr 90,000.00
17 Tukang Pipa org/hr 90,000.00
18 Tukang Listrik org/hr 90,000.00
19 Tukang Bongkar org/hr 90,000.00
20 Tukang Bongkar Kayu org/hr 90,000.00
21 Pekerja / Buruh tak terampil org/hr 80,000.00