Anda di halaman 1dari 7

NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.

Rp.
1 2 3 4

A AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug m³ 128.600
2 Sirtu m³ 158.900
3 Pasir Pasang Kali m³ 280.000
4 Pasir Beton I m³ 316.200
5 Batu Pecah Mesin 2/3 m³ 311.900
6 Batu Pecah Mesin 5/7 m³ 254.850
7 Batu Belah Pondasi m³ 265.000
8 Andesit susun sirih 30 x 30 m² 103.000
9 Batako Besar 8 x 20 x 30 bh 3.500
10 Bata Merah Bakar Kelas II bh 950
11 Bata Ringan uk. 60x20x10 cm m³ 750.000
12 Roster Beton 20 x 20 bh 10.500
13 Pore Blok Bata 6 cm m² 200.000
14 Beton Kanstin uk. 60x15x30 bh 60.800
15 Grass Block uk. 45x30x8 cm Lubang 8 K 250 bh 23.000
16 Floor hardener ex. Fosroc/ sika zak 120.000
17 Semen 50 kg Holcim zak 75.000
18 Perekat Bata Ringan 40 kg zak 115.000
19 Readymix Beton K 300, tanpa pompa ( selang ) m³ 1.295.000
20 Readymix Beton K 250, tanpa pompa ( selang ) m³ 1.239.000
21 Semen Warna kg 14.915
22 Air Liter 300
Ijuk kg 15.000

B BAHAN FINISHING :
LABURAN, PENGISI DAN ALATNYA
23 Plamir Tembok kg 30.925
24 Cat Tembok Eksterior Jotun lt 75.200
25 Cat Tembok Interior Vinilex lt 72.727
26 Pelapis Alkali Newlux ( Cat Dasar Beton Ekterior ) lt 15.000
27 Cat Dulux Trade Line Marking Paint lt 400.000
28 Water Profing Emulsion kg 65.000
29 Rool Cat Tembok bh 26.885
30 Kwas 3" bh 11.000
31 Dempul Plitur kg 43.875
32 Vernis Liter 40.095
33 Tiner A lt 24.890
34 Ampelas lbr 4.200
35 Dempul Kayu Cap Kucing kg 24.890
36 Meni Kayu / Besi kg 25.000
37 Cat Kayu Seiv kg 52.345
38 Cat Roadline kg 55.000
39 Soda Api kg 30.000
40 Lem Kuning kg 70.000
41 Melamin Impra kg 85.000
42 Cat Prada tube 780.000
NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.
Rp.
1 2 3 4
C BAHAN KAYU BERIKUT BAHAN JADINYA
43 Kayu Terentang / Kayu Kelas III m³ 3.950.100
44 Kayu Balok Kelas II m³ 3.950.100
45 Dolken 5 s/d 7 bt 10.000
46 Dolken 7 s/d 10 bt 25.000
47 Pembuatan Baner m² 30.000
48 List Plin Ukr ; 8.5 x 1.4 cm m' 40.000
49 List Plin Ukr ; 10 x 2 cm m' 40.000
50 List Profil Kamper 5cm m' 35.000
51 List Profil Kamper 2cm m' 25.000
52 List Profil Kamper 10cm m' 50.000
53 List Kayu Standar m' 40.000

D BAHAN PENUTUP RANGKA PLAFOND


48 Gypsum 120 x 240 t = 9 mm lbr 76.760
49 GRC T. 4MM , uk. 120 x 240 lbr 64.790
50 Celling / List Plafond Gypsum T. 10 cm m' 7.500
51 Coumpond zak 65.000
52 Sekrup gypsum duz 71.500
53 Besi Hollow Plafond Galvanis t= 0,35 mm uk 4 x 4 cm Panjang 4 meter btg 23.370
54 Besi Hollow Plafond Galvanis t= 0,35 mm uk 2 x 4 cm Panjang 4 meter btg 17.500
55 Plafon PVC 0,8mm x 30 cm m² 114.750

E BAHAN KAYU LAPIS


56 Triplek 3 mm 120 x 240 lbr 71.000
57 Triplek 4 mm 120 x 240 lbr 84.790
58 Triplek 6 mm 120 x 241 lbr 114.266
59 Multiplek 9 mm 120 x 240 lbr 125.115
60 Multiplek 12 mm 120 x 240 lbr 250.000
61 Multiplek 15 mm 120 x 240 lbr 280.000
62 Multiplek 18 mm 120 x 240 lbr 315.000
63 Pelapis HPL Uk. 120x240 lbr 145.000
64 Pelapis HPL per m2 lbr 75.000
65 Melamin Uk. 122 x 244 x 3 mm lbr 140.000

F BAHAN LANTAI DAN PELAPIS DINDING


60 Granit Homogeneous uk. 30 x 60 cm Polis m² 95.000
61 Granit Homogeneous uk. 60 x 60 cm Polis Niro GCA05 Slate m² 337.500
62 Granit Homogeneous uk. 60 x 60 cm Unpolis m² 403.050
63 keramik ukuran 20 cm x 20 cm ex. ASIA TILE m² 75.000
64 keramik ukuran 20 cm x 25 cm ex. ASIA TILE m² 70.000
65 keramik ukuran 40 cm x 40 cm ex. ASIA TILE m² 65.000

G BAHAN SALURAN AIR KOTOR / BERSIH


66 Grafel U 20 cm' m1 35.000
NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.
Rp.
1 2 3 4
H BAHAN LOGAM DAN BAHAN JADINYA
67 Besi Beton U-24 Rata - Rata kg 16.000
68 Bondek t= 0,75 mm m² 152.000
69 Kawat Beton kg 18.000
70 Kawat Las Listrik kg 30.000
71 Wiremesh M6 m² 45.414
72 Wiremesh M8 m² 69.665
73 Wiremesh M10 m² 119.048
74 Kusen Alumunium Warna 1.3 mm t=1,3 mm ( 4 " ) m1 115.000
75 Daun Jendela ukuran Kecil Casement Alumunium Coklat + Kaca 5 mm + Hardware m² 450.000
76 Daun Pintu Alumunium Warna ( Tanpa Kaca ) m2 750.000
77 Besi Hollow 40x40x 1,8 mm , p=6 m btg 110.000
78 Besi Hollow 20x40 x 1,8 mm , p = 6 m btg 65.000
79 Besi Hollow 40x60 x 1,8 mm , p = 6 m btg 150.000
80 Pipa Besi Staainless Steel 1,5", p = 6 m btg 540.000
81 Pipa Besi Staainless Steel 3/4", p = 6 m btg 420.000
82 Pas. Railling Tangga Pipa Besi Stainless Steel + Aksesoris m1 900.000
83 Pintu PVC uk. 70x200 unit 800.000
84 Pintu PVC uk. 90x200 unit 1.100.000

I BAHAN KACA
80 Kaca Polos 5 mm ( ASAHI ) m² 109.451
81 Kaca Clear Tempered 10 mm m² 465.000
82 Glass Block DN 20 x 20 ( Kedawung ) bh 25.000
83 Cermin wastafel 60x60 dibevel unit 348.000

J BAHAN PAKU DAN MUR BAUT


83 Paku 4 cm s/d 7 cm kg 14.000
84 Paku 8 cm s/d 12 cm kg 14.698
NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.
Rp.
1 2 3 4
K BAHAN PERPIPAAN
85 Pipa PVC Maspion type AW Ø 1/2" bt 36.000
86 Pipa PVC Maspion type AW Ø 3/4" bt 24.890
87 Pipa PVC Maspion type AW Ø 1" bt 33.915
88 Pipa PVC Maspion type AW Ø 1 1/4" bt 34.390
89 Pipa PVC Maspion type AW Ø 1 1/2" bt 42.390
90 Pipa PVC Maspion type AW Ø 2" bt 75.240
91 Pipa PVC Maspion type AW Ø 2 1/2" bt 89.775
92 Pipa PVC Maspion type AW Ø 3" bt 126.160
93 Pipa PVC Maspion type AW Ø 4" bt 173.945
94 Gate valve dia. 38 ex. Kitz Set 350.200
95 Gate valve dia. 25 ex. Kitz Set 265.300
96 Gate valve dia. 20 ex. Kitz Set 185.600
97 Pipa PVC Rucika VU 5″ Batang 390.000
98 Pipa PVC Rucika VP 0.75″ Batang 45.000
99 Solatip Leideng gl 7.500
100 Pipa Galvanis Medium A.SII Ø 1" m1 88.000
101 Saluran Beton Precast Pipa (RCP) Ø 60 cm m1 525.000
102 Bore pile dia. 30 cm m1 245.000

L BAHAN SANITAIR
102 Floor Drain bh 28.405
103 Jet Washer TOTO TX423SMCR bh 1.120.000
104 Kran Tembok Wasser bh 155.610
105 Closet Duduk TOTO C240 unit 2.015.900
106 Wastafel TOTO LW230 unit 760.095
107 Kran Wastafel TOTO TX109LD unit 804.000
108 Cermin Wastafel Type : TX716AW (TOTO) unit 350.000
109 Clean Closed Out 4" bh 173.800
110 Floor Clean Out ( FCO ) Ø 4 " bh 170.500
111 Roof Drain Stainless Ø 4 " bh 229.000
112 Tissue Holder TOTO Type TX703AESV1 bh 560.000
113 Gantungan (Double Robe Hook) TOTO Type TX704ACW bh 402.000
114 Zink Lengkap Aksesoris bh 1.250.000

M BAHAN PENUTUP ATAP


115 Rangka Atap Baja Ringan Kuda- Kuda & Kaso C.75 t=1mm + Reng A.35 SNI m² 172.000
116 Genteng Metal Berpasir m² 99.750
117 Nok Atas Metal Berpasir m1 69.825
118 Flashing Metal Berpasir m1 60.175
118 Alumunium foil bubble m² 15.105
119 Listplank GRC urat kayu 300 x 3000 tebal 8 mm Lbr 120.000
120 Genteng Bitumen Bergelombang Monolayer 3 mm uk. 106x40x30 cm Lbr 75.000
121 Screw Genteng bitumen bh 1.200
122 Nok bitumen Lbr 82.000
NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.
Rp.
1 2 3 4
N BAHAN MEKANIKAL
123 AC Split 2 Pk Split Ex Panasonik Unit 5.750.000
124 Pipa Refrigrand 2 Pk Include Isolasi Ex HODA m 110.000
125 Pipa Refrigrand 3 Pk Include Isolasi Ex HODA m 135.000
126 Exhaust Fan Seiling Plafon Ex KDK 6 in Unit 725.000
127 Insulation, merk Insuflex tebal = 1/2" m 13.250

O BAHAN ELEKTRIKAL
128 Kabel NYM 3x2,5 mm² Suprime m 11.583
129 Kabel NYM 3x4 mm² Suprime m 19.800
130 Kabel NYFGBY 3x4 mm² Suprime m 19.750
131 Kabel NYY 3x2,5 mm² Suprime m 81.000
132 Kabel NYY 3x10 mm² Suprime m 485.100
133 Kabel NYY 4x25 mm² Suprime m 940.500
134 Kabel NYY 4x35 mm² Suprime m 1.237.500
135 Kabel NYY 4x50 mm² Suprime m 1.633.500
136 Kabel NYMHY 2x1,5 mm² Suprime m 7.425
137 Kabel NYMHY 3x1,5 mm² Suprime m 10.450
138 Kabel BC 1x50 mm² Suprime m 46.900
139 Kabel tlp 2x2x0,6 Suprime m 2.420
140 Kabel tlp 10 pair Suprime m 16.500
141 Kabel tlp 10 pair Suprime m 20.900
142 Kabel Data Suprime m 6.500
143 T.BOX 10 pair Suprime unit 215.000
144 Conduit m' 3.900
145 Tee Doos buah 6.300
146 Sock buah 800
147 Klem buah 700
148 Sekrup buah 200
149 Fisher buah 200
NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.
Rp.
1 2 3 4
150 Lampu TL 1 x 18 w Waterproof unit 250.000
151 Lampu TL 2 x 18 w TKI + LOUVER ex Philips unit 350.000
152 Lampu Down Light PL 9 w ex Philips unit 175.000
153 Lampu Down Light SL 9 w ex Philips unit 135.000
154 Lampu Led Strip 8 watt unit 35.000
155 Lampu Flood Lamp 15 watt unit 165.000
156 Lampu Baret Kotak 22 watt unit 130.000
157 Saklar 1 Gang Ex Schneider Pc 19.250
158 Saklar 2 Gang Ex Schneider Pc 23.540
159 Stop Kontk 1P Ex Schneider Pc 23.540
160 Inboduus Ex Schneider Pc 2.500
161 Saklar 6 Gang Ex Schneider Pc 142.500
162 Inbowduus GS Ex Schneider Pc 12.500
163 Stop Kontak Lantai Ex Schneider Pc 485.000
164 Tombak Tembaga Set 523.000
165 Indoor Free Standing Box Set 479.000
166 MCCB 3P 100A bh 1.187.500
167 MCCB 3P 63 A bh 815.000
168 MCCB 3P 25 A bh 744.700
169 MCCB 3P 10 A bh 425.500
170 MCCB 3P 63 A bh 271.000
171 MCCB 1P 10 A bh 101.310
172 MCCB 1P 25 A bh 101.310
173 MCCB 1P 20 A bh 101.310
174 MCCB 1P 6 A bh 101.310

Q SOUND SYSTEEM
165 Paging Remote Mic Unit 1.250.000
166 Power Amplifier 360W Unit 6.750.000
167 Sektor Switch Unit 115.000
168 TB-S Unit 750.000
169 Coloum Speaker 10 w Unit 875.000
170 Ceiling Speaker 6 w Unit 175.000
171 Volume Control, Unit 155.000

P BAHAN TELEPHONE
172 PABX 2Ptt 24 Extention ex Panasonik Unit 22.300.000
173 UPS 2 Kw ex Prolink Unit 6.750.000
174 Outlet Telephon Ex Schneider Pc 53.020

Q BAHAN JARINGAN DATA


175 Server Data Unit 35.500.000
176 Switc Hub 12 Port ex D-Link Unit 20.750.000
177 outlet data Ex Schneider Unit 83.710
NO. JENIS BAHAN BANGUNAN SAT HARGA SAT.
Rp.
1 2 3 4

S BAHAN ALAT PENGANTUNG DAN KUNCI


178 Kunci Silinder ALFA untuk Pintu Alumunium bh 193.600
179 Tarikan Pintu Alumunium bh 150.000
180 Kunci 2 Slaag Ancor Asli bh 132.000
181 Engsel Pintu Stainless ps 35.000
182 Rambucis sloot Jendela bh 25.000

U BAHAN PENGHISAP AIR SUMUR DALAM


183 Mesin Pompa Air Sanyo P-H158JP unit 3.700.000
184 Pompa Pendorong Ex Sanyo unit 765.000

V BAHAN PENAMPUNG AIR


184 Roof Tank 2000 lt ( Penguin ) bh 4.250.000
185 Septictank Bio Fiber Glass ( Kapasitas 2000 Liter ) unit 7.020.000

Y STANDARD RATA - RATA SEWA ALAT BESAR , ALAT MEKANIK


TRUK, KENDARAAN RODA 4 & LAINNYA
186 Ecavator jam 350.000
187 Dump Truck 3.5 Ton jam 240.000
188 Stamper 8 Jam jam 150.000
189 Stang bor,batang bor ∅ 1,25" Hari 125.000
190 Mata Bor 6” Hari 400.000
191 Mata Bor 12” Hari 125.000

Z BAHAN BAKAR DAN PELUMAS


192 Plus Oil lt 45.000

BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


193 AC-WC ton 1.148.300
194 Aspal kg 10.620
195 Kayu Bakar Dari Kayu Karet m³ 173.900
196 Minyak Solar lt 10.600
197 Oli Mesran 40 SAE lt 34.800
198 Hotmix Jadi AC-Base berikut alat dan bahan bakar ton 1.160.000
199 Hotmix Jadi AC-BC berikut alat dan bahan bakar ton 1.225.000
200 Hotmix Jadi AC-WC berikut alat dan bahan bakar ton 1.260.000
201 Hotmix Jadi HRS berikut alat dan bahan bakar ton 1.332.500
202 Prime coat (harga bahan + upah kerja) lt 12.500
203 Tack coat (harga bahan + upah kerja) lt 12.750

Anda mungkin juga menyukai