Cco BLK Uptp Mamuju 20-06-2022
Cco BLK Uptp Mamuju 20-06-2022
1 I. PEKERJAAN PENDAHULUAN 2.11 1.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 100%
BOBOT RENCANA 100.00 2.86 1.51 2.21 2.60 2.60 3.41 2.18 2.18 4.44 4.34 4.22 4.22 4.04 5.09 6.10 5.86 4.98 4.98 4.98 8.33 3.48 3.48 3.26 3.26 3.26 2.12
KOMULATIF PROGRES FISIK MINGGUAN 2.86 4.37 6.59 9.19 11.79 15.20 17.38 19.57 24.01 28.35 32.57 36.78 40.82 45.91 52.01 57.87 62.85 67.83 72.80 81.13 84.62 88.10 91.36 94.62 97.88 100.00
SUMARDI
Direktur
JADWAL WAKTU PELAKSANAAN (TIME SCHEDULLE) BARCHART
PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
TAHUN ANGGARAN 2022
BOBOT WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO URAIAN PEKERJAAN KET
MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26
%
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180
1 I. PEKERJAAN PENDAHULUAN 2.11 1.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 100%
BOBOT RENCANA 100.00 2.86 1.51 2.21 2.60 2.60 3.41 2.18 2.18 4.44 4.34 4.22 4.22 4.04 5.09 6.10 5.86 4.98 4.98 4.98 8.33 3.48 3.48 3.26 3.26 3.26 2.12
KOMULATIF PROGRES FISIK MINGGUAN 2.86 4.37 6.59 9.19 11.79 15.20 17.38 19.57 24.01 28.35 32.57 36.78 40.82 45.91 52.01 57.87 62.85 67.83 72.80 81.13 84.62 88.10 91.36 94.62 97.88 100.00
SUMARDI
Direktur
JADWAL PENGIRIMAN TENAGA KERJA
PEKERJAAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
LOKASI : BERU-BERU, KALUKKU Kab. Mamuju Sulawesi Barat
WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO TENAGA KERJA MINGGU KE- MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26
HARI KE- 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180
1 MANAJER PROYEK
4 MANAJER KEUANGAN
5 AHLI K3 KONSTRUKSI
SUMARDI
Direktur
JADWAL PENGIRIMAN ALAT
PEKERJAAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
LOKASI : BERU-BERU, KALUKKU Kab. Mamuju Sulawesi Barat
WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO JENIS PERALATAN MINGGU KE- MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26
HARI KE- 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180
1 BATCHING PLANT
3 MOBIL MIXER
5 EXCAVATOR PC-200
6 MOBILE CRANE
SUMARDI
Direktur
JADWAL PENGIRIMAN MATERIAL / BAHAN
PEKERJAAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
LOKASI : BERU-BERU, KALUKKU Kab. Mamuju Sulawesi Barat
WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO JENIS MATERIAL / BARANG MINGGU KE- MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26
HARI KE- 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180
1 BESI
2 KAYU CAMPUR
3 TRIPLEK
4 SEMEN
5 PASIR
7 QUARY TIMBUNAN
9 TIANG PANCANG
11 U-DICT
13 PAGAR BRC
14 TRAFO
16 ACP
18 SANITARI
19 CAT
SUMARDI
Direktur
NET WORK PLANNING DIAGRAM
NOTASI :
A = NAMA PEKERJAAN
A
X = MULAI PEKERJAAN
Y = SELESAI PEKERJAAN X Y
Z = JUMLAH WAKTU PEKERJAAN Z
SUMARDI
Direktur
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU
SULAWESI BARAT
PEKERJAAN : PEKERJAAN K3
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
- Peronil K3
- Petugas K3 8.00 Org/6bln Rp. 4,500,000.00 Rp. 216,000,000.00 8.00 4,500,000.00 216,000,000.00 TETAP
7
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : #REF!
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
I #REF! #REF!
JUMLAH #REF!
8
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN GERBANG UTAMA
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
JUMLAH Rp 1,356,876,437.91
9
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN GERBANG UTAMA
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
a b c d e f g h (e x g) i j k l m n o p q
I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 40.00 m' Rp. 479,381.00 19,175,240.00 40.00 479,381.00 19,175,240.00 TETAP
II PEKERJAAN STRUKTUR
1 PONDASI TIANG PANCANG MINIPILE
- Minipile 25x25 8.00 bh
- Pengadaan dan Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01 88.00 m' Rp. 629,585.00 Rp. 55,403,480.00 88.00 629,585.00 55,403,480.00 TETAP
- Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01' 88.00 m' Rp. 385,385.00 Rp. 33,913,880.00 88.00 385,385.00 33,913,880.00
- Pekerjaan Joint/sambungan Tiang Pancang dan Welding AT. 02 8.00 titik Rp. 347,622.00 Rp. 2,780,976.00 8.00 347,622.00 2,780,976.00
- Tes PDA 1.00 titik Rp. 23,000,000.00 Rp. 23,000,000.00 1.00 23,000,000.00 23,000,000.00
2 POER
- Type P1 uk. 100x100X25 cm 8.00 bh
- Galian tanah Pondasi Poer A.2.3.1.2. 20.00 m3 Rp. 132,660.00 Rp. 2,653,200.00 20.00 132,660.00 2,653,200.00 TETAP
- Lantai kerja A.4.1.1.1 0.64 m2 Rp. 1,378,547.00 Rp. 882,270.08 0.64 1,378,547.00 882,270.08 TETAP
- Urugan kembali bekas galian A.2.3.1.9. 15.70 m3 Rp. 39,325.00 Rp. 617,559.80 15.70 39,325.00 617,559.80 TETAP
- Bekisting 2x pakai A.4.1.1.20 4.00 m2 Rp. 268,378.00 Rp. 1,073,512.00 4.00 268,378.00 1,073,512.00 TETAP
- Pembesian (Besi Ulir) 117.62 kg/m3 A.4.1.1.17 235.24 kg Rp. 19,868.20 Rp. 4,673,889.73 33.29 19,868.20 661,341.85 268.53 19,868.20 5,335,231.59 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.00 m3 Rp. 1,406,067.00 Rp. 2,812,134.00 2.00 1,406,067.00 2,812,134.00 TETAP
3 PEDESTAL KOLOM
- Kolom K1 uk. 30x30 8.00 bh
- Bekisting 2x pakai A.4.1.1.22 11.04 m2 Rp. 427,174.00 Rp. 4,716,000.96 11.04 427,174.00 4,716,000.96 TETAP
- Pembesian (Besi Polos) 115.74 kg/m3 A.4.1.1.17 191.66 kg Rp. 18,713.20 Rp. 3,586,599.34 191.66 18,713.20 3,586,599.34 TETAP
- Cor Beton K-275 A.4.1.1.9. 1.66 m3 Rp. 1,406,067.00 Rp. 2,328,446.95 1.66 1,406,067.00 2,328,446.95 TETAP
5 SLOEF
- Type S1 uk 20/25 12.64 m'
- Bekisting 2x pakai A.4.1.1.21 3.16 m2 Rp. 284,878.00 Rp. 900,214.48 3.16 284,878.00 900,214.48 TETAP
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 88.02 kg Rp. 18,713.20 Rp. 1,647,224.90 136.23 18,713.20 2,549,300.03 224.25 18,713.20 4,196,524.92 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.63 m3 Rp. 1,406,067.00 Rp. 888,634.34 0.63 1,406,067.00 888,634.34 TETAP
6 KOLOM LT.1
- Kolom K1 uk. 30x30 4.94 8.00 bh
- Bekisting 2x pakai A.4.1.1.22 16.80 m2 Rp. 427,174.00 Rp. 7,176,523.20 16.80 427,174.00 7,176,523.20 TETAP
- Pembesian (Besi Polos) 115.74 kg/m3 A.4.1.1.17 291.66 kg Rp. 18,713.20 Rp. 5,457,868.56 735.44 18,713.20 13,762,354.37 1,027.09 18,713.20 19,220,222.93 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.52 m3 Rp. 1,406,067.00 Rp. 3,543,288.84 2.52 1,406,067.00 3,543,288.84 TETAP
a b c d e f g h (e x g) i j k l m n o p q
- Cor Beton K-275 A.4.1.1.9. 1.46 m3 Rp. 1,406,067.00 Rp. 2,052,857.82 1.46 1,406,067.00 2,052,857.82 TETAP
7 BALOK
- Balok B1 uk. 20x25 12.64 m'
- Bekisting 2x pakai A.4.1.1.23 4.42 m2 Rp. 427,174.00 Rp. 1,889,817.78 4.42 427,174.00 1,889,817.78 TETAP
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 88.02 kg Rp. 18,713.20 Rp. 1,647,224.90 136.23 18,713.20 2,549,300.03 224.25 18,713.20 4,196,524.92 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.63 m3 Rp. 1,406,067.00 Rp. 888,634.34 0.63 1,406,067.00 888,634.34 TETAP
8 PLAT BETON
- Plat Beton 9.24 m2
- Bekisting Plat Lantai A.4.1.1.24 10.78 m2 Rp. 453,574.00 Rp. 4,887,713.42 10.78 453,574.00 4,887,713.42 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 170.13 kg Rp. 18,713.20 Rp. 3,183,756.66 55.69 18,713.20 1,042,095.59 225.82 18,713.20 4,225,852.25 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 1.11 m3 Rp. 1,406,067.00 Rp. 1,559,047.09 1.11 1,406,067.00 1,559,047.09 TETAP
- Waterproofing SikaTop Seal AT. 06 9.24 m2 Rp. 59,763.00 Rp. 552,210.12 9.24 59,763.00 552,210.12 TETAP
9 KOLOM LT.2
- Kolom K1 uk. 30x30 4.94 8.00 bh
- Bekisting 2x pakai A.4.1.1.22 19.20 m2 Rp. 427,174.00 Rp. 8,201,740.80 19.20 427,174.00 8,201,740.80 TETAP
- Pembesian (Besi Polos) 71.68 kg/m3 A.4.1.1.17 206.43 kg Rp. 18,713.20 Rp. 3,863,036.84 176.51 18,713.20 3,302,981.00 382.94 18,713.20 7,166,017.84 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.88 m3 Rp. 1,406,067.00 Rp. 4,049,472.96 2.88 1,406,067.00 4,049,472.96 TETAP
10 RING BALOK
- Ring Balok uk. 20x25 8.24 m'
- Bekisting 2x pakai A.4.1.1.23 2.88 m2 Rp. 427,174.00 Rp. 1,231,969.82 2.88 427,174.00 1,231,969.82 TETAP
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 57.38 kg Rp. 18,713.20 Rp. 1,073,823.83 1.44 18,713.20 26,982.47 55.94 18,713.20 1,046,841.36 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 0.41 m3 Rp. 1,406,067.00 Rp. 579,299.60 0.41 1,406,067.00 579,299.60 TETAP
- Pek. ACP PVDF 4 mm Glossy Alloy 1100 + Rangka AT. 18 49.40 m2 Rp. 1,022,555.00 Rp. 50,518,307.22 49.40 1,022,555.00 50,518,307.22 TETAP
11
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
- Pas. Dinding Bata Ringan T.10 Bata Ringan T:10 cm A.4.4.1.26 40.40 m2 Rp. 184,283.00 Rp. 7,444,664.63 40.40 184,283.00 7,444,664.63 TETAP
- Plesteran campuran 1 : 4 Camp. 1:4 T 15mm A.4.4.2.4. 95.99 m2 Rp. 89,139.00 Rp. 8,556,630.89 95.99 89,139.00 8,556,630.89 TETAP
- Plesteran campuran 1 : 2 (Trasram) Camp. 1:2 T 15mm A.4.4.2.2. 65.60 m2 Rp. 93,514.00 Rp. 6,134,518.40 65.60 93,514.00 6,134,518.40 TETAP
- Acian A.4.4.2.27. 73.42 m2 Rp. 50,985.00 Rp. 3,743,114.76 73.42 50,985.00 3,743,114.76 TETAP
- Pas. Granite Dinding Granito 25x60 A.4.4.3.54.a 7.38 m2 Rp. 553,512.00 Rp. 4,084,918.56 7.38 553,512.00 4,084,918.56 TETAP
2 PEKERJAAN LANTAI
- Pekerjaan Lantai (Lt.01)
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 0.92 m3 Rp. 571,230.00 Rp. 527,816.52 0.92 571,230.00 527,816.52 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 0.65 m3 Rp. 1,378,547.00 Rp. 891,644.20 0.65 1,378,547.00 891,644.20 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 7.80 m2 Rp. 392,667.00 Rp. 3,062,802.60 7.80 392,667.00 3,062,802.60 TETAP
- Pekerjaan Granit tile 60x60 (Unpolish) Gelap A.4.4.3.10.b 1.44 m2 Rp. 398,778.00 Rp. 574,240.32 1.44 398,778.00 574,240.32 TETAP
- Pekerjaan Jendela
- Jendela Type (J1) 2.00 bh
Kusen UPVC UPVC Retto Putih AT. 07 30.80 m' Rp. 455,733.00 Rp. 14,036,576.40 30.80 455,733.00 14,036,576.40 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 10.20 m' Rp. 625,133.00 Rp. 6,376,356.60 10.20 625,133.00 6,376,356.60 TETAP
Kaca T.5mm A.4.6.2.17. 6.09 m2 Rp. 343,495.00 Rp. 2,091,060.16 6.09 343,495.00 2,091,060.16 TETAP
Engsel Jendela Casement Dekkson FS SS 20" A.4.6.2.7. 12.00 bh Rp. 277,849.00 Rp. 3,334,188.00 12.00 277,849.00 3,334,188.00 TETAP
Grendel Slot/Kunci Slot UPVC A.4.6.2.11. 6.00 bh Rp. 574,948.00 Rp. 3,449,688.00 6.00 574,948.00 3,449,688.00 TETAP
4 PEKERJAAN PLAFOND
- Pekerjaan Rangka Plafond
- Rangka Hollow A.4.2.1.21. 9.24 m2 Rp. 167,959.00 Rp. 1,551,941.16 9.24 167,959.00 1,551,941.16 TETAP
5 PEKERJAAN PENGECATAN
- Pekerjaan Pengecatan
- Pek. Cat luar A.4.7.1.10. 40.40 m2 Rp. 57,629.00 Rp. 2,328,096.34 40.40 57,629.00 2,328,096.34 TETAP
- Pek. Cat dalam A.4.7.1.10.a 33.02 m2 Rp. 49,049.00 Rp. 1,619,499.88 33.02 49,049.00 1,619,499.88 TETAP
- Pek. Cat Besi Kisi-Kisi Hollow A.4.7.1.21. 21.65 m2 Rp. 174,460.00 Rp. 3,777,756.84 21.65 174,460.00 3,777,756.84 TETAP
6 PEKERJAAN LAIN-LAIN
- Pekerjaan ACP
- Pek.ACP PVDF 4 mm Glossy Alloy 1100 + Rangka 409.19 m2 Rp. 1,022,555.00 Rp. 418,416,212.79 409.19 1,022,555.00 418,416,212.79 TETAP
- Pek. Cutting ACP 10.50 m2 Rp. 500,000.00 Rp. 5,250,000.00 10.50 500,000.00 5,250,000.00 TETAP
- Pek. Letter Pembuatan "BALAI LATIHAN KERJA" Harga Material 1.00 LS Rp. 6,000,000.00 Rp. 6,000,000.00 1.00 6,000,000.00 6,000,000.00 TETAP
- Pek. Letter Pembuatan "KEMENTERIAN KETENAGAKERJAAN" Harga Material 1.00 LS Rp. 10,200,000.00 Rp. 10,200,000.00 1.00 10,200,000.00 10,200,000.00 TETAP
- Pek. Letter Pembuatan "PROVINSI SULAWESI BARAT" Harga Material 1.00 LS Rp. 7,000,000.00 Rp. 7,000,000.00 1.00 7,000,000.00 7,000,000.00 TETAP
- Pek. Letter Pembuatan "JLN. POROS PALU-MAMUJU, BERU-BERU. Harga Material 1.00 LS Rp. 10,000,000.00 Rp. 10,000,000.00 1.00 10,000,000.00 10,000,000.00 TETAP
KALUKKU, KABUPATEN, MAMUJU, 90561"
12
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
- LETTER STENLES + AKRILIK '' BALAI LATIHAN KERJA SULAWESI Harga Material 1.00 LS Rp. 35,000,000.00 Rp. 35,000,000.00 1.00 35,000,000.00 35,000,000.00 TETAP
BARAT ''
Spesifikasi : Stenless Body Miror
Akrilik 3mm lapisan letter
Lampu LED 3 mata
Box Panel + timer
Power Suplay
- Pek. Videotron Harga Material 6.00 Unit Rp. 25,000,000.00 Rp. 150,000,000.00 6.00 25,000,000.00 150,000,000.00 TETAP
Spesifikasi :
Product Model : P.8 Indoor Full Colour Ukuran 2 X 4 m
Pixel Pitch : 8 mm 96 X 2 = 192 cm
LED Type : SMD Epy Star 96 X 4 = 388 cm
Module Size : W:320 X H:160 mm Luas = ± 12 M²
Cabinet Type : Die Cast Alumunium
Cabinet Size : W:960 X H:960 mm
- Nova Studio (Software) Harga Material 1.00 LS Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- Receiving Card Novastar Harga Material 12.00 Unit Rp. 600,000.00 Rp. 7,200,000.00 12.00 600,000.00 7,200,000.00 TETAP
- Rangka V-tron (Fame Kontruksi V-tro) Harga Material 1.00 LS Rp. 12,000,000.00 Rp. 12,000,000.00 1.00 12,000,000.00 12,000,000.00 TETAP
Pek. Aksesoris
- Video Processor LVP Harga Material 1.00 Unit Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP
- Laptop Processor Core i7 Harga Material 1.00 Unit Rp. 10,000,000.00 Rp. 10,000,000.00 1.00 10,000,000.00 10,000,000.00 TETAP
- Power Distribution Panel Harga Material 1.00 Set Rp. 8,000,000.00 Rp. 8,000,000.00 1.00 8,000,000.00 8,000,000.00 TETAP
- Stabilizer Harga Material 1.00 Unit Rp. 3,400,000.00 Rp. 3,400,000.00 1.00 3,400,000.00 3,400,000.00 TETAP
- Cabel Data (Belden/M) + Connector Harga Material 50.00 m' Rp. 30,000.00 Rp. 1,500,000.00 50.00 30,000.00 1,500,000.00 TETAP
Pek. Lain-lain
- Setting + Comissioning + Testing + Training Harga Material 1.00 LS Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP
IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pekerjaan Kabel-Kabel
- Dari KWH ke panel MDP NYY 4x50 mm2 AT. 26 10.00 m' Rp. 490,050.00 Rp. 4,900,500.00 10.00 490,050.00 4,900,500.00 TETAP
- Dari MDP ke PP-LP NYY 4x4 mm2 + NYA 1x4 mm2 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Pekerjaan Panel
- MDP (Main Distribution Panel) Harga Material 1.00 unit Rp. 15,000,000.00 Rp. 15,000,000.00 1.00 15,000,000.00 15,000,000.00 TETAP
- Pekerjaan Ac Lantai 01
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa refrigran (1PK) 1.00 unit Rp. 7,932,408.00 Rp. 7,932,408.00 1.00 7,932,408.00 7,932,408.00 TETAP
- Stop kontak AC 16A, 1ph , 3 kaki 1.00 bh Rp. 79,860.00 Rp. 79,860.00 1.00 79,860.00 79,860.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) 1.00 titik Rp. 402,710.00 Rp. 402,710.00 1.00 402,710.00 402,710.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex 3.00 m' Rp. 15,000.00 Rp. 45,000.00 3.00 15,000.00 45,000.00 TETAP
2 PEKERJAAN PLUMBING
- Pekerjaan Air Bersih
- Tandon Air 1050 Liter Penguin AT. 71 1.00 bh Rp. 1,966,470.00 Rp. 1,966,470.00 1.00 1,966,470.00 1,966,470.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 1.00 m' Rp. 58,509.00 Rp. 58,509.00 1.00 58,509.00 58,509.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 3.00 m' Rp. 50,886.00 Rp. 152,658.00 3.00 50,886.00 152,658.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 6.00 m' Rp. 33,066.00 Rp. 198,396.00 6.00 33,066.00 198,396.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 1.00 bh Rp. 513,865.00 Rp. 513,865.00 1.00 513,865.00 513,865.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 1.00 bh Rp. 343,915.00 Rp. 343,915.00 1.00 343,915.00 343,915.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 1.00 bh Rp. 5,547,630.00 Rp. 5,547,630.00 1.00 5,547,630.00 5,547,630.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 1.00 bh Rp. 354,915.00 Rp. 354,915.00 1.00 354,915.00 354,915.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 1.00 bh Rp. 398,915.00 Rp. 398,915.00 1.00 398,915.00 398,915.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 1.00 bh Rp. 458,865.00 Rp. 458,865.00 1.00 458,865.00 458,865.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 1.00 bh Rp. 623,865.00 Rp. 623,865.00 1.00 623,865.00 623,865.00 TETAP
- Test Commisioning
- Test Commisioning Harga Material 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP
TOTAL JUMLAH HARGA PEKERJAAN GERBANG Rp. 1,356,876,437.91 30,042,348.00 26,982.47 1,386,891,803.44
13
REKAPITULASI BILL OF QUANTITY
JUMLAH Rp 7,670,574,072.76
14
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN GEDUNG KANTOR UTAMA
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 40.00 m' Rp. 479,381.00 Rp. 19,175,240.00 40.00 479,381.00 19,175,240.00 TETAP
- Pekerjaan Pagar Proyek Harga Material 160.00 m' Rp. 85,500.00 Rp. 13,680,000.00 160.00 85,500.00 13,680,000.00 0.00 85,500.00 - BERKURANG
II PEKERJAAN STRUKTUR
1 PONDASI TIANG PANCANG MINIPILE
- Minipile 25x25 40.00 bh
- Pengadaan dan Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01 440.00 m' Rp. 629,585.00 Rp. 277,017,400.00 440.00 629,585.00 277,017,400.00 TETAP
- Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01' 440.00 m' Rp. 385,385.00 Rp. 169,569,400.00 440.00 385,385.00 169,569,400.00 TETAP
- Pekerjaan Joint/sambungan Tiang Pancang dan Welding AT. 02 40.00 titik Rp. 347,622.00 Rp. 13,904,880.00 40.00 347,622.00 13,904,880.00 TETAP
- Tes PDA 2.00 titik Rp. 23,000,000.00 Rp. 46,000,000.00 2.00 23,000,000.00 46,000,000.00 TETAP
2 POER
- Type P1 uk. 160x160X30 cm 40.00 bh
- Galian tanah Pondasi Poer A.2.3.1.2. 291.84 m3 Rp. 132,660.00 Rp. 38,715,494.40 291.84 132,660.00 38,715,494.40 TETAP
- Lantai kerja A.4.1.1.1 10.24 m2 Rp. 1,378,547.00 Rp. 14,116,321.28 10.24 1,378,547.00 14,116,321.28 TETAP
- Urugan kembali bekas galian A.2.3.1.9. 235.20 m3 Rp. 39,325.00 Rp. 9,249,240.00 235.20 39,325.00 9,249,240.00 TETAP
- Bekisting 2x pakai A.4.1.1.20 38.40 m2 Rp. 268,378.00 Rp. 10,305,715.20 38.40 268,378.00 10,305,715.20 TETAP
- Pembesian (Besi Ulir) 228.47 kg/m3 A.4.1.1.17 7,018.57 kg Rp. 19,868.20 Rp. 139,446,323.82 1,464.01 19,868.20 29,087,214.83 5,554.56 19,868.20 110,359,108.99 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 30.72 m3 Rp. 1,406,067.00 Rp. 43,194,378.24 30.72 1,406,067.00 43,194,378.24 TETAP
3 PEDESTAL KOLOM
- Kolom K1 uk. 40x40 40.00 bh
- Bekisting 2x pakai A.4.1.1.22 78.40 m2 Rp. 427,174.00 Rp. 33,490,441.60 78.40 427,174.00 33,490,441.60 TETAP
- Pembesian (Besi Ulir) 78.91 kg/m3 A.4.1.1.17 1237.34 kg Rp. 19,868.20 Rp. 24,583,721.77 1256.36 19,868.20 24,961,529.10 2,493.70 19,868.20 49,545,250.87 BERTAMBAH
- Pembesian (Besi Polos) 42.64 kg/m3 A.4.1.1.17 668.61 kg Rp. 18,713.20 Rp. 12,511,922.48 668.61 18,713.20 12,511,922.48 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 15.68 m3 Rp. 1,406,067.00 Rp. 22,047,130.56 15.68 1,406,067.00 22,047,130.56 TETAP
5 SLOEF
- Type S1 uk 20/40 300.50 m'
- Bekisting 2x pakai A.4.1.1.21 120.20 m2 Rp. 284,878.00 Rp. 34,242,335.60 120.20 284,878.00 34,242,335.60 TETAP
- Pembesian (Besi Ulir) 78.14 kg/m3 A.4.1.1.17 1,878.52 kg Rp. 19,868.20 Rp. 37,322,784.34 1,947.67 19,868.20 38,696,779.45 3,826.19 19,868.20 76,019,563.79 BERTAMBAH
- Pembesian (Besi Polos) 48.55 kg/m3 A.4.1.1.17 1,167.13 kg Rp. 18,713.20 Rp. 21,840,680.51 1,167.13 18,713.20 21,840,680.51 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 24.04 m3 Rp. 1,406,067.00 Rp. 33,801,850.68 24.04 1,406,067.00 33,801,850.68 TETAP
6 PLAT LANTAI 1
- Plat Lantai 1
- Pembesian wiremesh 1 Lapis M-8 m2 500.79 78,628.00 39,376,116.12 500.79 78,628.00 39,376,116.12 BERTAMBAH
- Cor Beton K-275 t. 10 cm m3 1,406,067.00 50.079 1,406,067.00 70,414,429.29 50.08 1,406,067.00 70,414,429.29 BERTAMBAH
- Bekisting 2x pakai m2 284,878.00 109.2 284,878.00 31,108,677.60 109.20 284,878.00 31,108,677.60 BERTAMBAH
7 KOLOM LT.1
- Kolom K1 uk. 40x40 4.94 40.00 bh
15
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
- Bekisting 2x pakai A.4.1.1.22 128.00 m2 Rp. 427,174.00 Rp. 54,678,272.00 128.00 427,174.00 54,678,272.00 TETAP
- Pembesian (Besi Ulir) 78.91 kg/m3 A.4.1.1.17 2,020.15 kg Rp. 19,868.20 Rp. 40,136,688.60 1,464.65 19,868.20 29,100,014.76 3,484.80 19,868.20 69,236,703.36 BERTAMBAH
- Pembesian (Besi Polos) 42.64 kg/m3 A.4.1.1.17 1,091.62 kg Rp. 18,713.20 Rp. 20,427,628.53 1,091.62 18,713.20 20,427,628.53 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 25.60 m3 Rp. 1,406,067.00 Rp. 35,995,315.20 25.60 1,406,067.00 35,995,315.20 TETAP
7 TANGGA
- Tangga Beton 1
- Anak Tangga 21.00 bh
Bekisting A.4.1.1.26 16.30 m2 Rp. 391,699.00 Rp. 6,384,443.01 16.30 391,699.00 6,384,443.01 TETAP
Pembesian (Besi Polos) 49.32 kg/m3 A.4.1.1.17 86.50 kg Rp. 18,713.20 Rp. 1,618,754.20 86.50 18,713.20 1,618,754.20 TETAP
Cor Beton K-275 A.4.1.1.9. 1.75 m3 Rp. 1,406,067.00 Rp. 2,466,129.03 1.75 1,406,067.00 2,466,129.03 TETAP
8 PLAT BORDES
- Plat Bordes T=25 3.90 m2
- Bekisting A.4.1.1.24 7.80 m2 Rp. 453,574.00 Rp. 3,537,877.20 7.80 453,574.00 3,537,877.20 TETAP
- Pembesian (Besi Polos) 39.46 kg/m3 A.4.1.1.17 76.94 kg Rp. 18,713.20 Rp. 1,439,778.64 - 76.94 18,713.20 1,439,778.64 TETAP
- Cor Beton K-275 A.4.1.1.9. 1.95 m3 Rp. 1,406,067.00 Rp. 2,741,830.65 1.95 1,406,067.00 2,741,830.65 TETAP
9 BALOK TANGGA
- Balok Beton uk. 20x40 4.50 m'
- Bekisting 2x pakai A.4.1.1.23 2.25 m2 Rp. 440,374.00 Rp. 990,841.50 2.25 440,374.00 990,841.50 TETAP
- Pembesian (Besi Ulir) 78.14 kg/m3 A.4.1.1.17 28.13 kg Rp. 19,868.20 Rp. 558,910.25 28.13 19,868.20 558,910.25 TETAP
- Pembesian (Besi Polos) 31.07 kg/m3 A.4.1.1.17 11.19 kg Rp. 18,713.20 Rp. 209,321.66 11.19 18,713.20 209,321.66 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.36 m3 Rp. 1,406,067.00 Rp. 506,184.12 0.36 1,406,067.00 506,184.12 TETAP
10 BALOK
- Balok B1 uk. 25x40 302.00 m'
- Bekisting 2x pakai A.4.1.1.23 158.55 m2 Rp. 440,374.00 Rp. 69,821,297.70 158.55 440,374.00 69,821,297.70 TETAP
- Pembesian (Besi Ulir) 110.48 kg/m3 A.4.1.1.17 3,336.40 kg Rp. 19,868.20 Rp. 66,288,249.76 1,924.43 19,868.20 38,234,906.61 5,260.83 19,868.20 104,523,156.38 BERTAMBAH
- Pembesian (Besi Polos) 54.25 kg/m3 A.4.1.1.17 1,638.41 kg Rp. 18,713.20 Rp. 30,659,901.50 1,638.41 18,713.20 30,659,901.50 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 30.20 m3 Rp. 1,406,067.00 Rp. 42,463,223.40 30.20 1,406,067.00 42,463,223.40 TETAP
11 PLAT LANTAI
- Plat Lantai 2 395.79 m2
- Steel floor decking 1 m2 Bondek 0.75 AT. 05 395.79 m2 Rp. 626,824.00 Rp. 248,090,670.96 395.79 626,824.00 248,090,670.96 TETAP
- Pembesian wiremesh 2 Lapis M-8 1 m2 A.4.1.1.19 395.79 m2 Rp. 78,628.00 Rp. 31,120,176.12 395.79 78,628.00 31,120,176.12 791.58 78,628.00 62,240,352.24 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 47.49 m3 Rp. 1,406,067.00 Rp. 66,780,870.95 47.49 1,406,067.00 66,780,870.95 TETAP
12 KOLOM LT.2
- Kolom K1 uk. 40x40 4.94 40.00 bh
- Bekisting 2x pakai A.4.1.1.22 128.00 m2 Rp. 427,174.00 Rp. 54,678,272.00 128.00 427,174.00 54,678,272.00 TETAP
- Pembesian (Besi Ulir) 78.91 kg/m3 A.4.1.1.17 2020.15 kg Rp. 19,868.20 Rp. 40,136,688.60 1720.40 19,868.20 34,181,187.70 3,740.54 19,868.20 74,317,876.30 BERTAMBAH
- Pembesian (Besi Polos) 42.64 kg/m3 A.4.1.1.17 1091.62 kg Rp. 18,713.20 Rp. 20,427,628.53 1,091.62 18,713.20 20,427,628.53 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 25.60 m3 Rp. 1,406,067.00 Rp. 35,995,315.20 25.60 1,406,067.00 35,995,315.20 TETAP
13 RING BALOK
- Balok uk. 20x40 282.00 m'
- Bekisting 2x pakai A.4.1.1.23 141.00 m2 Rp. 440,374.00 Rp. 62,092,734.00 141.00 440,374.00 62,092,734.00 TETAP
- Pembesian (Besi Polos) 87.08 kg/m3 A.4.1.1.17 1,964.54 kg Rp. 18,713.20 Rp. 36,762,809.34 1,964.54 18,713.20 36,762,809.34 TETAP
- Cor Beton K-275 A.4.1.1.9. 22.56 m3 Rp. 1,406,067.00 Rp. 31,720,871.52 22.56 1,406,067.00 31,720,871.52 TETAP
16
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
- Cor Beton K-275 A.4.1.1.9. 4.91 m3 Rp. 1,406,067.00 Rp. 6,896,758.64 4.91 1,406,067.00 6,896,758.64 TETAP
14 RANGKA ATAP
- Pasang Kuda-Kuda Baja Ringan Atap Pelana A.4.2.1.22. 384.78 m2 Rp. 360,050.00 Rp. 138,539,174.88 384.78 360,050.00 138,539,174.88 TETAP
- Pasang Kuda-Kuda Baja Ringan Atap Jurai A.4.2.1.23. 211.14 m2 Rp. 346,238.00 Rp. 73,103,998.84 211.14 346,238.00 73,103,998.84 TETAP
15 PENUTUP ATAP
- Pekerjaan Penutup Atap Pelana
- Pekerjaan Alumunium Foil A.4.5.2.43. 384.78 m2 Rp. 180,609.00 Rp. 69,494,297.56 384.78 180,609.00 69,494,297.56 TETAP
- Pekerjaan Atap Bitumen Gelombang AT. 03 384.78 m2 Rp. 192,951.00 Rp. 74,243,222.70 384.78 192,951.00 74,243,222.70 TETAP
- Pekerjaan Nok Atap Bitumen AT. 04 29.80 m' Rp. 135,349.00 Rp. 4,033,400.20 29.80 135,349.00 4,033,400.20
2 PEKERJAAN LANTAI
- Pekerjaan Lantai
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 117.27 m3 Rp. 571,230.00 Rp. 66,985,285.95 117.27 571,230.00 66,985,285.95 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 58.63 m3 Rp. 1,378,547.00 Rp. 80,827,656.98 58.63 1,378,547.00 80,827,656.98 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 754.95 m2 Rp. 392,667.00 Rp. 296,443,951.65 754.95 392,667.00 296,443,951.65 TETAP
- Pekerjaan Granit tile 60x60 (Unpolish) Gelap A.4.4.3.55. 417.70 m2 Rp. 398,778.00 Rp. 166,569,570.60 417.70 398,778.00 166,569,570.60 TETAP
- Pintu Type (D4) 15.00 bh Rp. 858,000.00 Rp. 12,870,000.00 15.00 858,000.00 12,870,000.00 TETAP
Kusen UPVC UPVC Retto Putih AT. 07 67.50 m' Rp. 455,733.00 Rp. 30,761,977.50 67.50 455,733.00 30,761,977.50 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 88.50 m' Rp. 625,133.00 Rp. 55,324,270.50 88.50 625,133.00 55,324,270.50 TETAP
Panil UPVC AT. 10 19.95 m2 Rp. 584,433.00 Rp. 11,659,438.35 19.95 584,433.00 11,659,438.35 TETAP
Handle Pintu + Lockcase AT. 16 15.00 bh Rp. 800,844.00 Rp. 12,012,660.00 15.00 800,844.00 12,012,660.00 TETAP
Engsel Pintu A.4.6.2.5. 45.00 bh Rp. 70,970.00 Rp. 3,193,650.00 45.00 70,970.00 3,193,650.00 TETAP
- Pekerjaan Jendela
- Jendela Type (J1) 2.00 bh
Kusen UPVC UPVC Retto Putih AT. 08 72.80 m' Rp. 455,733.00 Rp. 33,177,362.40 72.80 455,733.00 33,177,362.40 TETAP
Kaca T.5mm A.4.6.2.17. 22.40 m2 Rp. 343,495.00 Rp. 7,694,288.00 22.40 343,495.00 7,694,288.00 TETAP
17
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
4 PEKERJAAN PLAFOND
- Pekerjaan Rangka Plafond
- Rangka Hollow A.4.2.1.21. 140.00 m2 Rp. 167,959.00 Rp. 23,514,260.00 140.00 167,959.00 23,514,260.00 TETAP
5 PEKERJAAN PENGECATAN
- Pekerjaan Pengecatan
- Pek. Cat A.4.7.1.10. 2,149.44 m2 Rp. 57,629.00 Rp. 123,869,789.62 2,149.44 57,629.00 123,869,789.62 TETAP
6 PEKERJAAN LAIN-LAIN
- Pekerjaan Railing besi
- Pekerjaan Railing untuk Tangga AT. 17 17.82 m' Rp. 1,004,740.00 Rp. 17,904,466.80 17.82 1,004,740.00 17,904,466.80 TETAP
- Pekerjaan ACP
- Pek. ACP PVDF 4 mm Glossy Alloy 1100 + Rangka AT. 18 504.42 m2 Rp. 1,022,555.00 Rp. 515,799,238.21 504.42 1,022,555.00 515,799,238.21 TETAP
IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pekerjaan Kabel-Kabel
- Dari KWH ke panel MDP NYY 4x50 mm2 AT. 26 10.00 m' Rp. 490,050.00 Rp. 4,900,500.00 10.00 490,050.00 4,900,500.00 TETAP
- Dari MDP ke PP-LP NYY 4x4 mm2 + NYA 1x4 mm2 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari MDP ke PP-SK & AC NYY 4x25 mm2 + NYA 1x16 mm3 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP
- Dari MDP ke SDP-Lt.2 NYY 4x35 mm2 + NYA 1x16 mm4 AT. 24 10.00 m' Rp. 464,933.33 Rp. 4,649,333.33 10.00 464,933.33 4,649,333.33 TETAP
- Dari SDP-Lt.2 ke PP-LP Lt.2 NYY 4x4 mm2 + NYA 1x4 mm5 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari SDP-Lt.2 ke PP-SK & AC Lt.2 NYY 4x25 mm2 + NYA 1x16 mm6 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP
- Peketrjaan Panel
- MDP (Main Distribution Panel) Harga Material 1.00 unit Rp. 15,000,000.00 Rp. 15,000,000.00 1.00 15,000,000.00 15,000,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.1 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- SDP (Sub Distribution Panel) Lt. 2 Harga Material 1.00 unit Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.2 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Lt.2 Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- Pentanahan Elektrikal MAX 2 OHM Harga Material 1.00 titik Rp. 7,000,000.00 Rp. 7,000,000.00 1.00 7,000,000.00 7,000,000.00 TETAP
18
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
- Air Terminal, Radius Proteksi Minimal 120 Meter AT. 49 1.00 unit Rp. 6,210,402.00 Rp. 6,210,402.00 1.00 6,210,402.00 6,210,402.00 TETAP
- Obstruction Light led 5 W AT. 51 1.00 bh Rp. 5,988,400.00 Rp. 5,988,400.00 1.00 5,988,400.00 5,988,400.00 TETAP
- Conductor Cable NYY 1x70 mm2 dalam pipa conduit AT. 50 60.00 m' Rp. 141,900.00 Rp. 8,514,000.00 60.00 141,900.00 8,514,000.00 TETAP
- Cable Clamp, Support & accesories dan material bantu lain 1.00 ls Rp. 851,400.00 Rp. 851,400.00 1.00 851,400.00 851,400.00 TETAP
- Grounding max 2 ohm/electroda pentanahan AT. 52 1.00 titik Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Tiang Harga Material 1.00 ls Rp. 1,300,000.00 Rp. 1,300,000.00 1.00 1,300,000.00 1,300,000.00 TETAP
- Pekerjaan Pentanahan
- Pentanahan Listrik Arus Kuat AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Pentanahan Listrik Arus Lemah AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Pekerjaan Ac Lantai 01
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa refrigran (2PK) AT. 64 12.00 unit Rp. 10,288,608.00 Rp. 123,463,296.00 12.00 10,288,608.00 123,463,296.00 TETAP
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 12.00 bh Rp. 79,860.00 Rp. 958,320.00 12.00 79,860.00 958,320.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 12.00 titik Rp. 402,710.00 Rp. 4,832,520.00 12.00 402,710.00 4,832,520.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 120.00 m' Rp. 15,000.00 Rp. 1,800,000.00 120.00 15,000.00 1,800,000.00 TETAP
- Pekerjaan Ac Lantai 02
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa refrigran (2 PK) AT. 64 7.00 unit Rp. 10,288,608.00 Rp. 72,020,256.00 7.00 10,288,608.00 72,020,256.00 TETAP
- AC Split System - Wall mounted type, 9.000 BTU/h Termasuk Pipa refrigran (1 PK) AT. 62 2.00 unit Rp. 7,932,408.00 Rp. 15,864,816.00 2.00 7,932,408.00 15,864,816.00 TETAP
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 6.00 bh Rp. 79,860.00 Rp. 479,160.00 6.00 79,860.00 479,160.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 6.00 titik Rp. 402,710.00 Rp. 2,416,260.00 6.00 402,710.00 2,416,260.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 120.00 m' Rp. 15,000.00 Rp. 1,800,000.00 120.00 15,000.00 1,800,000.00 TETAP
2 PEKERJAAN PLUMBING
- Pekerjaan Air Bersih Lantai 1
- Roof Tank Kapasitas 4 m3 FRP AT. 70 1.00 bh Rp. 14,286,470.00 Rp. 14,286,470.00 1.00 14,286,470.00 14,286,470.00 TETAP
- Pipa PVC AW dia 40 mm A.5.1.1 28. a 20.00 m' Rp. 85,239.00 Rp. 1,704,780.00 20.00 85,239.00 1,704,780.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 45.00 m' Rp. 58,509.00 Rp. 2,632,905.00 45.00 58,509.00 2,632,905.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 31.00 m' Rp. 50,886.00 Rp. 1,577,466.00 31.00 50,886.00 1,577,466.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 73.00 m' Rp. 33,066.00 Rp. 2,413,818.00 73.00 33,066.00 2,413,818.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 2.00 bh Rp. 513,865.00 Rp. 1,027,730.00 2.00 513,865.00 1,027,730.00 TETAP
- Wastafel LW 643 J Inc. Acessories A.5.1.1 5. 5.00 bh Rp. 4,128,231.00 Rp. 20,641,155.00 5.00 4,128,231.00 20,641,155.00 TETAP
- Kran Wastafel TX109LD A.5.1.1 19. a 5.00 bh Rp. 1,168,915.00 Rp. 5,844,575.00 5.00 1,168,915.00 5,844,575.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 5.00 bh Rp. 343,915.00 Rp. 1,719,575.00 5.00 343,915.00 1,719,575.00 TETAP
- Urinoir U57M inc. acessories A.5.1.1 4. 5.00 bh Rp. 7,194,132.00 Rp. 35,970,660.00 5.00 7,194,132.00 35,970,660.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 6.00 bh Rp. 5,547,630.00 Rp. 33,285,780.00 6.00 5,547,630.00 33,285,780.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 6.00 bh Rp. 354,915.00 Rp. 2,129,490.00 6.00 354,915.00 2,129,490.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 6.00 bh Rp. 398,915.00 Rp. 2,393,490.00 6.00 398,915.00 2,393,490.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 6.00 bh Rp. 458,865.00 Rp. 2,753,190.00 6.00 458,865.00 2,753,190.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 6.00 bh Rp. 623,865.00 Rp. 3,743,190.00 6.00 623,865.00 3,743,190.00 TETAP
- Cermin Wastafel A.5.1.1 14.b 5.00 bh Rp. 2,768,865.00 Rp. 13,844,325.00 5.00 2,768,865.00 13,844,325.00 TETAP
19
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q
- Pipa PVC AW dia 114 mm + Vent Inc. acessories A.5.1.1 32. a 66.00 m' Rp. 239,134.00 Rp. 15,782,844.00 66.00 239,134.00 15,782,844.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP
- Test Commisioning
- Test Commisioning Harga Material 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP
TOTAL JUMLAH HARGA PEKERJAAN GEDUNG UTAMA Rp. 7,670,574,072.76 366,540,846.20 154,749,420.90 7,882,365,498.05
20
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
JUMLAH Rp 8,652,160,860.74
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
a b c d e f g h (e x g) i j k l m n o p q
I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 60.00 m' Rp. 479,381.00 Rp. 28,762,860.00 60.00 479,381.00 28,762,860.00 TETAP
- Pekerjaan Pagar Proyek Harga Material 200.00 m' Rp. 85,500.00 Rp. 17,100,000.00 200.00 85,500.00 17,100,000.00 0.00 85,500.00 - BERKURANG
II PEKERJAAN STRUKTUR
1 PONDASI TIANG PANCANG MINIPILE
- Minipile 25x25 27.00 bh
- Pengadaan dan Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01 297.00 m' Rp. 629,585.00 Rp. 186,986,745.00 297.00 629,585.00 186,986,745.00 TETAP
- Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01' 297.00 Rp. 385,385.00 Rp. 114,459,345.00 297.00 385,385.00 114,459,345.00 TETAP
- Pekerjaan Joint/sambungan Tiang Pancang dan Welding AT. 02 27.00 titik Rp. 347,622.00 Rp. 9,385,794.00 27.00 347,622.00 9,385,794.00 TETAP
- Tes PDA 2.00 titik Rp. 23,000,000.00 Rp. 46,000,000.00 2.00 23,000,000.00 46,000,000.00 TETAP
2 POER
- Type P1 uk. 160x160X30 cm 27.00 bh
- Galian tanah Pondasi Poer A.2.3.1.2. 210.82 m3 Rp. 132,660.00 Rp. 27,966,850.56 210.82 132,660.00 27,966,850.56 TETAP
- Lantai kerja A.4.1.1.1 6.91 m2 Rp. 1,378,547.00 Rp. 9,528,516.86 6.91 1,378,547.00 9,528,516.86 TETAP
- Urugan kembali bekas galian A.2.3.1.9. 158.38 m3 Rp. 39,325.00 Rp. 6,228,372.15 158.38 39,325.00 6,228,372.15 TETAP
- Bekisting 2x pakai A.4.1.1.20 25.92 m2 Rp. 268,378.00 Rp. 6,956,357.76 25.92 268,378.00 6,956,357.76 TETAP
- Pembesian (Besi Ulir) 228.47 kg/m3 A.4.1.1.17 4,737.53 kg Rp. 19,868.20 Rp. 94,126,268.58 - 988.21 19,868.20 19,633,870.01 3,749.33 19,868.20 74,492,398.57 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 20.74 m3 Rp. 1,406,067.00 Rp. 29,156,205.31 20.74 1,406,067.00 29,156,205.31 TETAP
3 PEDESTAL KOLOM
- Kolom K1 uk. 60x60 27.00 bh
- Bekisting 2x pakai A.4.1.1.22 82.62 m2 Rp. 427,174.00 Rp. 35,293,115.88 82.62 427,174.00 35,293,115.88 TETAP
- Pembesian (Besi Ulir) 35.07 kg/m3 A.4.1.1.17 869.29 kg Rp. 19,868.20 Rp. 17,271,318.81 1,114.82 19,868.20 22,149,399.33 1,984.11 19,868.20 39,420,718.14 BERTAMBAH
- Pembesian (Besi Polos) 28.09 kg/m3 A.4.1.1.17 696.11 kg Rp. 18,713.20 Rp. 13,026,535.66 696.11 18,713.20 13,026,535.66 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 24.79 m3 Rp. 1,406,067.00 Rp. 34,850,776.66 24.79 1,406,067.00 34,850,776.66 TETAP
5 SLOEF
- Type S1 uk 35/75 259.05 m'
- Bekisting 2x pakai A.4.1.1.21 181.34 m2 Rp. 284,878.00 Rp. 51,658,352.13 181.34 284,878.00 51,658,352.13 TETAP
- Pembesian (Besi Ulir) 177.55 kg/m3 A.4.1.1.17 11,268.74 kg Rp. 19,868.20 Rp. 223,889,523.88 2,062.02 19,868.20 40,968,680.84 9,206.71 19,868.20 182,920,843.04 BERKURANG
- Pembesian (Besi Polos) 63.96 kg/m3 A.4.1.1.17 4,059.48 kg Rp. 18,713.20 Rp. 75,965,941.81 4,059.48 18,713.20 75,965,941.81 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 63.47 m3 Rp. 1,406,067.00 Rp. 89,239,205.81 63.47 1,406,067.00 89,239,205.81 TETAP
22
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
6 KOLOM LT.1
- Kolom K1 uk. 60x60 4.94 27.00 bh
- Bekisting 2x pakai A.4.1.1.22 129.60 m2 Rp. 427,174.00 Rp. 55,361,750.40 129.60 427,174.00 55,361,750.40 TETAP
- Pembesian (Besi Ulir) 146.38 kg/m3 A.4.1.1.17 5,691.16 kg Rp. 19,868.20 Rp. 113,073,165.35 3,334.55 19,868.20 66,251,531.22 9,025.71 19,868.20 179,324,696.57 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 38.88 m3 Rp. 1,406,067.00 Rp. 54,667,884.96 38.88 1,406,067.00 54,667,884.96 TETAP
7 TANGGA
- Tangga Beton 1
- Anak Tangga 17.00 bh
Bekisting A.4.1.1.26 17.14 m2 Rp. 391,699.00 Rp. 6,712,154.06 17.14 391,699.00 6,712,154.06 TETAP
Pembesian (Besi Polos) 66.79 kg/m3 A.4.1.1.17 145.33 kg Rp. 18,713.20 Rp. 2,719,581.87 145.33 18,713.20 2,719,581.87 TETAP
Cor Beton K-275 A.4.1.1.9. 2.18 m3 Rp. 1,406,067.00 Rp. 3,059,601.79 2.18 1,406,067.00 3,059,601.79 TETAP
8 PLAT BORDES
- Plat Bordes T=25 3.00 m2
- Bekisting A.4.1.1.24 3.00 m2 Rp. 453,574.00 Rp. 1,360,722.00 3.00 453,574.00 1,360,722.00 TETAP
- Pembesian (Besi Polos) 94.53 kg/m3 A.4.1.1.17 42.54 kg Rp. 18,713.20 Rp. 796,031.46 42.54 18,713.20 796,031.46 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.45 m3 Rp. 1,406,067.00 Rp. 632,730.15 0.45 1,406,067.00 632,730.15 TETAP
9 BALOK TANGGA
- Balok Beton uk. 20x30 6.85 m'
- Bekisting 2x pakai A.4.1.1.23 3.43 m2 Rp. 440,374.00 Rp. 1,508,280.95 3.43 440,374.00 1,508,280.95 TETAP
- Pembesian (Besi Ulir) 104.19 kg/m3 A.4.1.1.17 57.10 kg Rp. 19,868.20 Rp. 1,134,380.80 57.10 19,868.20 1,134,380.80 TETAP
- Pembesian (Besi Polos) 34.85 kg/m3 A.4.1.1.17 19.10 kg Rp. 18,713.20 Rp. 357,409.66 19.10 18,713.20 357,409.66 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.55 m3 Rp. 1,406,067.00 Rp. 770,524.72 0.55 1,406,067.00 770,524.72 TETAP
10 BALOK
- Balok B1 uk. 40x70 246.80 m'
- Bekisting 2x pakai A.4.1.1.23 222.12 m2 Rp. 440,374.00 Rp. 97,815,872.88 222.12 440,374.00 97,815,872.88 TETAP
- Pembesian (Besi Ulir) 154.71 kg/m3 A.4.1.1.17 10,691.00 kg Rp. 19,868.20 Rp. 212,411,020.84 3,194.46 19,868.20 63,468,218.58 13,885.47 19,868.20 275,879,239.42 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 69.10 m3 Rp. 1,406,067.00 Rp. 97,164,853.97 69.10 1,406,067.00 97,164,853.97 TETAP
11 PLAT LANTAI
- Plat Lantai 2 531.80 m2
- Steel floor decking 1 m2 Bondek 0.75 AT. 05 531.80 m2 Rp. 626,824.00 Rp. 333,345,003.20 531.80 626,824.00 333,345,003.20 TETAP
- Pembesian wiremesh 2 Lapis M-8 1 m2 A.4.1.1.19 531.80 m2 Rp. 78,628.00 Rp. 41,814,370.40 531.80 78,628.00 41,814,370.40 1,063.60 78,628.00 83,628,740.80 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 63.82 m3 Rp. 1,406,067.00 Rp. 89,729,571.67 63.82 1,406,067.00 89,729,571.67 TETAP
- Waterproofing SikaTop Seal AT. 06 22.80 m2 Rp. 59,763.00 Rp. 1,362,596.40 22.80 59,763.00 1,362,596.40 TETAP
12 KOLOM LT.2
- Kolom K1 uk. 60x60 4.94 27.00 bh
- Bekisting 2x pakai A.4.1.1.22 129.60 m2 Rp. 427,174.00 Rp. 55,361,750.40 129.60 427,174.00 55,361,750.40 TETAP
- Pembesian (Besi Ulir) 146.38 kg/m3 A.4.1.1.17 5,691.16 kg Rp. 19,868.20 Rp. 113,073,165.35 3,334.55 19,868.20 66,251,531.22 9,025.71 19,868.20 179,324,696.57 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 38.88 m3 Rp. 1,406,067.00 Rp. 54,667,884.96 38.88 1,406,067.00 54,667,884.96 TETAP
13 RING BALOK
- Ring Balok uk. 30x65 238.05 m'
- Bekisting 2x pakai A.4.1.1.23 190.44 m2 Rp. 440,374.00 Rp. 83,864,824.56 190.44 440,374.00 83,864,824.56 TETAP
- Pembesian (Besi Ulir) 72.84 kg/m3 A.4.1.1.17 3,381.30 kg Rp. 19,868.20 Rp. 67,180,350.38 6,705.04 19,868.20 133,216,990.53 10,086.34 19,868.20 200,397,340.92 BERTAMBAH
- Pembesian (Besi Polos) 41.31 kg/m3 A.4.1.1.17 1,917.64 kg Rp. 18,713.20 Rp. 35,885,098.14 1,917.64 18,713.20 35,885,098.14 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 46.42 m3 Rp. 1,406,067.00 Rp. 65,269,278.62 46.42 1,406,067.00 65,269,278.62 TETAP
23
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
14 ROOF TOP
- Plat Roof Top 290.00 m2
- Bekisting Plat Lantai A.4.1.1.24 290.00 m2 Rp. 453,574.00 Rp. 131,536,460.00 290.00 453,574.00 131,536,460.00 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 5,339.71 kg Rp. 18,713.20 Rp. 99,923,098.60 5,339.71 18,713.20 99,923,098.60 TETAP
- Cor Beton K-275 A.4.1.1.9. 34.80 m3 Rp. 1,406,067.00 Rp. 48,931,131.60 34.80 1,406,067.00 48,931,131.60 TETAP
- Waterproofing SikaTop Seal AT. 06 302.16 m2 Rp. 59,763.00 Rp. 18,057,988.08 302.16 59,763.00 18,057,988.08 TETAP
- Waterproofing Membrane Bakar Membrane m2 Rp. - Rp. - 302.16 375,000.00 113,310,000.00 302.16 375,000.00 113,310,000.00 BERTAMBAH
15 RANGKA ATAP
- Pasang Kuda-Kuda Baja Ringan Atap Jurai A.4.2.1.23. 356.72 m2 Rp. 346,238.00 Rp. 123,510,019.36 356.72 346,238.00 123,510,019.36 TETAP
16 PENUTUP ATAP
- Pekerjaan Penutup Atap Jurai
- Pekerjaan Alumunium Foil A.4.5.2.43. 356.72 m2 Rp. 180,609.00 Rp. 64,426,842.48 356.72 180,609.00 64,426,842.48 TETAP
- Pekerjaan Atap Bitumen Gelombang AT. 03 356.72 m2 Rp. 192,951.00 Rp. 68,829,480.72 356.72 192,951.00 68,829,480.72 TETAP
- Pekerjaan Nok Atap Bitumen AT. 04 45.40 m' Rp. 135,349.00 Rp. 6,144,844.60 45.40 135,349.00 6,144,844.60 TETAP
2 PEKERJAAN LANTAI
- Pekerjaan Lantai
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 6.16 m3 Rp. 571,230.00 Rp. 3,518,776.80 6.16 571,230.00 3,518,776.80 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 3.02 m3 Rp. 1,378,547.00 Rp. 4,161,006.26 3.02 1,378,547.00 4,161,006.26 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 1,252.25 m2 Rp. 392,667.00 Rp. 491,717,250.75 1,252.25 392,667.00 491,717,250.75 TETAP
- Pekerjaan Granit tile 60x60 (Unpolish) Gelap A.4.4.3.55. 40.60 m2 Rp. 398,778.00 Rp. 16,190,386.80 40.60 398,778.00 16,190,386.80 TETAP
24
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
- Pintu Type (D5) 4.00 bh Rp. 858,000.00 Rp. 3,432,000.00 4.00 858,000.00 3,432,000.00 TETAP
Kusen UPVC UPVC Retto Putih AT. 07 18.00 m' Rp. 455,733.00 Rp. 8,203,194.00 18.00 455,733.00 8,203,194.00 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 26.40 m' Rp. 625,133.00 Rp. 16,503,511.20 26.40 625,133.00 16,503,511.20 TETAP
Panil UPVC AT. 10 4.44 m2 Rp. 584,433.00 Rp. 2,594,882.52 4.44 584,433.00 2,594,882.52 TETAP
Handle Pintu + Lockcase AT. 16 4.00 bh Rp. 800,844.00 Rp. 3,203,376.00 4.00 800,844.00 3,203,376.00 TETAP
Engsel Pintu A.4.6.2.5. 12.00 bh Rp. 70,970.00 Rp. 851,640.00 12.00 70,970.00 851,640.00 TETAP
- Pekerjaan Jendela
- Jendela Type (J1) 6.00 bh
Kusen UPVC UPVC Retto Putih AT. 08 305.04 m' Rp. 455,733.00 Rp. 139,016,794.32 305.04 455,733.00 139,016,794.32 TETAP
Kaca T.5mm A.4.6.2.17. 93.60 m2 Rp. 343,495.00 Rp. 32,151,132.00 93.60 343,495.00 32,151,132.00 TETAP
4 PEKERJAAN PLAFOND
- Pekerjaan Rangka Plafond
- Rangka Hollow A.4.2.1.21. 57.00 m2 Rp. 167,959.00 Rp. 9,573,663.00 57.00 167,959.00 9,573,663.00 TETAP
5 PEKERJAAN PENGECATAN
- Pekerjaan Pengecatan
- Pek. Cat luar A.4.7.1.10. 2,051.82 m2 Rp. 57,629.00 Rp. 118,244,150.37 2,051.82 57,629.00 118,244,150.37 TETAP
25
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
- Pek. Cat dalam A.4.7.1.10.a 2,051.82 m2 Rp. 49,049.00 Rp. 100,639,562.22 2,051.82 49,049.00 100,639,562.22 TETAP
6 PEKERJAAN LAIN-LAIN
- Pekerjaan Railing besi
- Pekerjaan Railing Stainless (Rangka Kaca Tempered) AT. 17 38.64 m' Rp. 1,004,740.00 Rp. 38,823,153.60 38.64 1,004,740.00 38,823,153.60 TETAP
- Pekerjaan Kaca Tempered 10 mm AT. 11a 28.21 m2 Rp. 1,037,144.00 Rp. 29,254,928.24 28.21 1,037,144.00 29,254,928.24 TETAP
- Pekerjaan ACP
- Pek. ACP PVDF 4 mm Glossy Alloy 1100 + Rangka AT. 18 623.40 m2 Rp. 1,022,555.00 Rp. 637,462,995.72 623.40 1,022,555.00 637,462,995.72 TETAP
IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pekerjaan Kabel-Kabel
- Dari KWH ke panel MDP NYY 4x50 mm2 AT. 26 10.00 m' Rp. 490,050.00 Rp. 4,900,500.00 10.00 490,050.00 4,900,500.00 TETAP
- Dari MDP ke PP-LP NYY 4x4 mm2 + NYA 1x4 mm2 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari MDP ke PP-SK & AC NYY 4x25 mm2 + NYA 1x16 mm3 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP
- Dari MDP ke SDP-Lt.2 NYY 4x35 mm2 + NYA 1x16 mm4 AT. 24 10.00 m' Rp. 464,933.33 Rp. 4,649,333.33 10.00 464,933.33 4,649,333.33 TETAP
- Dari SDP-Lt.2 ke PP-LP Lt.2 NYY 4x4 mm2 + NYA 1x4 mm5 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari SDP-Lt.2 ke PP-SK & AC Lt.2 NYY 4x25 mm2 + NYA 1x16 mm6 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP
- Peketrjaan Panel
- MDP (Main Distribution Panel) Harga Material 1.00 unit Rp. 15,000,000.00 Rp. 15,000,000.00 1.00 15,000,000.00 15,000,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.1 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- SDP (Sub Distribution Panel) Lt. 2 Harga Material 1.00 unit Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.2 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Lt.2 Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- Pentanahan Elektrikal MAX 2 OHM Harga Material 1.00 titik Rp. 7,000,000.00 Rp. 7,000,000.00 1.00 7,000,000.00 7,000,000.00 TETAP
- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort dan AT. 30 20.00 m' Rp. 273,900.00 Rp. 5,478,000.00 20.00 273,900.00 5,478,000.00 TETAP
accessories lainnya
- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort dan AT. 30 20.00 m' Rp. 273,900.00 Rp. 5,478,000.00 20.00 273,900.00 5,478,000.00 TETAP
accessories lainnya
- Pekerjaan Pentanahan
- Pentanahan Listrik Arus Kuat AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Pentanahan Listrik Arus Lemah AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
26
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
- Pengkabelan dari MDF-FA ke TB-FA NYA 3x2.5 mm2 dalam pipa conduit AT. 61 8.00 m' Rp. 268,950.00 Rp. 2,151,600.00 8.00 268,950.00 2,151,600.00 TETAP
- Instalasi Fire Alarm kabel NYA 2x1.5 mm2 dalam pipa conduit AT. 60 46.00 ttk Rp. 233,750.00 Rp. 10,752,500.00 46.00 233,750.00 10,752,500.00 TETAP
- Portable Fire extinguisher dry chemical class abc 3 kg Harga Material 8.00 bh Rp. 800,000.00 Rp. 6,400,000.00 8.00 800,000.00 6,400,000.00 TETAP
- Pekerjaan Ac Lantai 01
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa AT. 64 6.00 unit Rp. 10,288,608.00 Rp. 61,731,648.00 6.00 10,288,608.00 61,731,648.00 TETAP
refrigran (2PK)
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 6.00 bh Rp. 79,860.00 Rp. 479,160.00 6.00 79,860.00 479,160.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 6.00 titik Rp. 402,710.00 Rp. 2,416,260.00 6.00 402,710.00 2,416,260.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 60.00 m' Rp. 15,000.00 Rp. 900,000.00 60.00 15,000.00 900,000.00 TETAP
- Pekerjaan Ac Lantai 02
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa AT. 64 6.00 unit Rp. 10,288,608.00 Rp. 61,731,648.00 6.00 10,288,608.00 61,731,648.00 TETAP
refrigran (2 PK)
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 6.00 bh Rp. 79,860.00 Rp. 479,160.00 6.00 79,860.00 479,160.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 6.00 titik Rp. 402,710.00 Rp. 2,416,260.00 6.00 402,710.00 2,416,260.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 120.00 m' Rp. 15,000.00 Rp. 1,800,000.00 120.00 15,000.00 1,800,000.00 TETAP
2 PEKERJAAN PLUMBING
- Pekerjaan Air Bersih Lantai 1
- Roof Tank Kapasitas 4 m3 FRP AT. 70 1.00 bh Rp. 14,286,470.00 Rp. 14,286,470.00 1.00 14,286,470.00 14,286,470.00 TETAP
- Pipa PVC AW dia 40 mm A.5.1.1 28. a 20.00 m' Rp. 85,239.00 Rp. 1,704,780.00 20.00 85,239.00 1,704,780.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 62.00 m' Rp. 58,509.00 Rp. 3,627,558.00 62.00 58,509.00 3,627,558.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 31.00 m' Rp. 50,886.00 Rp. 1,577,466.00 31.00 50,886.00 1,577,466.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 64.00 m' Rp. 33,066.00 Rp. 2,116,224.00 64.00 33,066.00 2,116,224.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 2.00 bh Rp. 513,865.00 Rp. 1,027,730.00 2.00 513,865.00 1,027,730.00 TETAP
- Wastafel LW 643 J Inc. Acessories A.5.1.1 5. 2.00 bh Rp. 4,128,231.00 Rp. 8,256,462.00 2.00 4,128,231.00 8,256,462.00 TETAP
- Kran Wastafel TX109LD A.5.1.1 19. a 2.00 bh Rp. 1,168,915.00 Rp. 2,337,830.00 2.00 1,168,915.00 2,337,830.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 4.00 bh Rp. 343,915.00 Rp. 1,375,660.00 4.00 343,915.00 1,375,660.00 TETAP
- Urinoir U57M inc. acessories A.5.1.1 4. 2.00 bh Rp. 7,194,132.00 Rp. 14,388,264.00 2.00 7,194,132.00 14,388,264.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 5.00 bh Rp. 5,547,630.00 Rp. 27,738,150.00 5.00 5,547,630.00 27,738,150.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 5.00 bh Rp. 354,915.00 Rp. 1,774,575.00 5.00 354,915.00 1,774,575.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 5.00 bh Rp. 398,915.00 Rp. 1,994,575.00 5.00 398,915.00 1,994,575.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 5.00 bh Rp. 458,865.00 Rp. 2,294,325.00 5.00 458,865.00 2,294,325.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 5.00 bh Rp. 623,865.00 Rp. 3,119,325.00 5.00 623,865.00 3,119,325.00 TETAP
- Cermin Wastafel A.5.1.1 14.b 2.00 bh Rp. 2,768,865.00 Rp. 5,537,730.00 2.00 2,768,865.00 5,537,730.00 TETAP
27
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP
- Test Commisioning
- Test Commisioning Harga Material 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP
TOTAL JUMLAH HARGA PEKERJAAN PARIWISATA Rp. 8,652,160,860.74 579,631,647.30 226,220,536.03 9,005,571,972.01
28
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
JUMLAH Rp 3,192,452,387.92
29
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 40.00 m' Rp. 479,381.00 Rp. 19,175,240.00 40.00 479,381.00 19,175,240.00 TETAP
- Pekerjaan Pagar Proyek Harga Material 80.00 m' Rp. 85,500.00 Rp. 6,840,000.00 80.00 85,500.00 6,840,000.00 0.00 85,500.00 - BERKURANG
II PEKERJAAN STRUKTUR
1 POER
Type P1 uk. 120x120X40 cm bh 12.00
- Galian tanah Pondasi Poer m3 Rp. 132,660.00 Rp. - 56.45 132,660.00 7,488,391.68 56.45 132,660.00 7,488,391.68 BERTAMBAH
- Lantai kerja m2 Rp. 1,378,547.00 Rp. - 1.73 1,378,547.00 2,382,129.22 1.73 1,378,547.00 2,382,129.22 BERTAMBAH
- Urugan kembali bekas galian m3 Rp. 39,325.00 Rp. - 47.04 39,325.00 1,849,848.00 47.04 39,325.00 1,849,848.00 BERTAMBAH
- Bekisting 2x pakai m2 Rp. 268,378.00 Rp. - 23.04 268,378.00 6,183,429.12 23.04 268,378.00 6,183,429.12 BERTAMBAH
- Pembesian (Besi Ulir) kg Rp. 19,868.20 Rp. - 1,590.62 19,868.20 31,602,835.76 1,590.62 19,868.20 31,602,835.76 BERTAMBAH
- Cor Beton K-275 m3 Rp. 1,406,067.00 Rp. - 6.91 1,406,067.00 9,718,735.10 6.91 1,406,067.00 9,718,735.10 BERTAMBAH
2 PEDESTAL KOLOM
Kolom K1 uk. 30x30
- Bekisting 2x pakai m2 Rp. 427,174.00 Rp. - 21.31 427,174.00 9,103,932.29 21.31 427,174.00 9,103,932.29 BERTAMBAH
- Pembesian (Besi Polos) kg Rp. 18,713.20 Rp. - 692.47 18,713.20 12,958,277.21 692.47 18,713.20 12,958,277.21 BERTAMBAH
- Cor Beton K-275 m3 Rp. 1,406,067.00 Rp. - 1.60 1,406,067.00 2,247,457.49 1.60 1,406,067.00 2,247,457.49 BERTAMBAH
- Galian tanah Grountank A.2.3.1.1. 185.14 m3 Rp. 108,075.00 Rp. 20,008,573.20 185.136 108,075.00 20,008,573.20 0.00 108,075.00 - BERKURANG
- Urugan kembali A.2.3.1.9. 162.03 m3 Rp. 39,325.00 Rp. 6,371,908.40 162.032 39,325.00 6,371,908.40 0.00 39,325.00 - BERKURANG
- Urugan pasir A.2.3.1.11. 2.44 m3 Rp. 571,230.00 Rp. 1,391,516.28 2.436 571,230.00 1,391,516.28 0.00 571,230.00 - BERKURANG
Urugan Lantai kerja A.2.3.1.11. 4.87 m3 Rp. 571,230.00 Rp. 2,783,032.56 4.872 571,230.00 2,783,032.56 0.00 571,230.00 - BERKURANG
2 SLOEF
- Type S1 uk 25/40 64.00 m'
- Bekisting 2x pakai A.4.1.1.21 25.60 m2 Rp. 284,878.00 Rp. 7,292,876.80 25.60 284,878.00 7,292,876.80 BERTAMBAH
- Pembesian (Besi Polos) 149.93 kg/m3 A.4.1.1.17 959.57 kg Rp. 18,713.20 Rp. 17,956,623.83 303.80 18,713.20 5,685,092.69 1,263.37 18,713.20 23,641,716.51 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 6.40 m3 Rp. 1,406,067.00 Rp. 8,998,828.80 6.40 1,406,067.00 8,998,828.80 BERTAMBAH
4 KOLOM LT.1
- Kolom K1 uk. 30x30 4.94 12.00 bh
- Bekisting 2x pakai A.4.1.1.22 28.80 m2 Rp. 427,174.00 Rp. 12,302,611.20 28.80 427,174.00 12,302,611.20 TETAP
- Pembesian (Besi Polos) 206.05 kg/m3 A.4.1.1.17 890.13 kg Rp. 18,713.20 Rp. 16,657,131.31 1,354.20 18,713.20 25,341,397.48 2,244.33 18,713.20 41,998,528.79 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 4.32 m3 Rp. 1,406,067.00 Rp. 6,074,209.44 4.32 1,406,067.00 6,074,209.44 TETAP
5 BALOK
- Balok BK1 uk. 25x40 22.00 m'
- Bekisting 2x pakai A.4.1.1.23 6.05 m2 Rp. 440,374.00 Rp. 2,664,262.70 6.05 440,374.00 2,664,262.70 TETAP
30
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
- Pembesian (Besi Polos) 186.32 kg/m3 A.4.1.1.17 122.97 kg Rp. 18,713.20 Rp. 2,301,184.66 1,140.40 18,713.20 21,340,531.85 1,263.37 18,713.20 23,641,716.51 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.66 m3 Rp. 1,406,067.00 Rp. 928,004.22 0.66 1,406,067.00 928,004.22 TETAP
6 ATAP PLAT
- Atap Plat Beton T=12 cm (elev. +3.00)
- Bekisting Plat Lantai A.4.1.1.24 42.64 m2 Rp. 453,574.00 Rp. 19,340,395.36 42.64 453,574.00 19,340,395.36 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 785.12 kg Rp. 18,713.20 Rp. 14,692,141.12 1,464.72 18,713.20 27,409,558.19 2,249.84 18,713.20 42,101,699.31 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 5.12 m3 Rp. 1,406,067.00 Rp. 7,194,563.63 5.12 1,406,067.00 7,194,563.63 TETAP
- Waterproofing SikaTop Seal AT. 06 85.28 m2 Rp. 59,763.00 Rp. 5,096,588.64 85.28 59,763.00 5,096,588.64 TETAP
- Waterproofing Membrane Bakar Membrane AT. 06 m2 Rp. 375,000.00 Rp. - 85.28 375,000.00 31,980,000.00 85.28 375,000.00 31,980,000.00 BERTAMBAH
7 BETON GROUNDTANK
- Bekisting 2x pakai A.4.1.1.24 144.48 m2 Rp. 453,574.00 Rp. 65,532,371.52 144.48 453,574.00 65,532,371.52 0.00 453,574.00 - BERKURANG
- Pembesian (Besi Polos) A.4.1.1.17 2,772.28 kg Rp. 18,713.20 Rp. 51,878,233.30 2,772.28 18,713.20 51,878,233.30 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 Dinding A.4.1.1.9. 20.37 m3 Rp. 1,406,067.00 Rp. 28,638,772.66 20.37 1,406,067.00 28,638,772.66 0.00 1,406,067.00 - BERKURANG
- Beton lantai kerja K100 A.4.1.1.1 4.26 m3 Rp. 1,378,547.00 Rp. 5,878,124.41 4.26 1,378,547.00 5,878,124.41 0.00 1,378,547.00 - BERKURANG
- Cor Beton K-275 Plat A.4.1.1.9. 5.12 m3 Rp. 1,406,067.00 Rp. 7,194,563.63 5.12 1,406,067.00 7,194,563.63 0.00 1,406,067.00 - BERKURANG
2 PEKERJAAN LANTAI
- Pekerjaan Lantai
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 1.25 m3 Rp. 571,230.00 Rp. 716,322.42 1.25 571,230.00 716,322.42 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 0.61 m3 Rp. 1,378,547.00 Rp. 847,061.99 0.61 1,378,547.00 847,061.99 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 111.80 m2 Rp. 392,667.00 Rp. 43,900,170.60 111.80 392,667.00 43,900,170.60 TETAP
- Pintu Type RPM P2 2x90 AT. 76 1.00 bh Rp. 11,933,097.00 Rp. 11,933,097.00 1.00 11,933,097.00 11,933,097.00 TETAP
Kusen Pintu Baja
Pintu Baja 2 mm Rangkap + Rangka
pengecatan Semprot
Kunci dan Handel
Engsel Pintu Baja
6 PEKERJAAN LAIN-LAIN
-
- Tutup Manhole Harga Material 2.00 bh Rp. 2,700,000.00 Rp. 5,400,000.00 2.00 2,700,000.00 5,400,000.00 0.00 2,700,000.00 - BERKURANG
Tutup Kontrol Hole Harga Material 4.00 bh Rp. 2,200,000.00 Rp. 8,800,000.00 4.00 2,200,000.00 8,800,000.00 0.00 2,200,000.00 - BERKURANG
Exhaustfan Harga Material 3.00 bh Rp. 900,000.00 Rp. 2,700,000.00 3.00 900,000.00 2,700,000.00 BERKURANG
Tangga Monyet Harga Material 8.00 bh Rp. 145,000.00 Rp. 1,160,000.00 4.00 145,000.00 580,000.00 4.00 145,000.00 580,000.00 BERKURANG
IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pek. Instalasi Penerangan & Stop Kontak Lantai 01
- Lampu RM TL led 2X9 Watt AT. 35 6.00 bh Rp. 581,166.67 Rp. 3,487,000.00 6.00 581,166.67 3,487,000.00 TETAP
- Lampu Downlight RD 150 LED 9 Watt AT. 32 6.00 bh Rp. 247,866.67 Rp. 1,487,200.00 6.00 247,866.67 1,487,200.00 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 2.00 bh Rp. 60,995.00 Rp. 121,990.00 2.00 60,995.00 121,990.00 TETAP
- Saklar tunggal AT. 41 5.00 bh Rp. 48,130.50 Rp. 240,652.50 5.00 48,130.50 240,652.50 TETAP
- Saklar ganda AT. 43 2.00 bh Rp. 75,350.00 Rp. 150,700.00 2.00 75,350.00 150,700.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 9.00 ttk Rp. 268,950.00 Rp. 2,420,550.00 9.00 268,950.00 2,420,550.00 TETAP
- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort AT. 30 40.00 m' Rp. 273,900.00 Rp. 10,956,000.00 40.00 273,900.00 10,956,000.00 TETAP
dan accessories lainnya
31
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
- Dari SDP POMPA ke P Kontrol Hydrant Pump NYY 4x95 mm2 + Harga Material 10.00 m Rp. 1,140,000.00 Rp. 11,400,000.00 10.00 1,140,000.00 11,400,000.00 0.00 1,140,000.00 - BERKURANG
NYA 1x16 mm2
- Dari SDP POMPA ke P Kontrol Pompa Air Bersih 1 NYY 4x10 mm2 Harga Material 10.00 m Rp. 300,000.00 Rp. 3,000,000.00 10.00 300,000.00 3,000,000.00 0.00 300,000.00 - BERKURANG
+ NYA 1x6 mm3
- Dari SDP POMPA ke P Kontrol Pompa Air Bersih 2 NYY 4x10 mm2 Harga Material 10.00 m Rp. 300,000.00 Rp. 3,000,000.00 10.00 300,000.00 3,000,000.00 0.00 300,000.00 - BERKURANG
+ NYA 1x6 mm4
- Dari SDP POMPA ke P Kontrol Deep Well NYY 4x10mm2 + NYA Harga Material 10.00 m Rp. 300,000.00 Rp. 3,000,000.00 10.00 300,000.00 3,000,000.00 0.00 300,000.00 - BERKURANG
1x6 mm3
- Dari P. Kontrol Hydran Pump ke Electric Pump NYY 3(1 X 70) mm Harga Material 8.00 m Rp. 500,000.00 Rp. 4,000,000.00 8.00 500,000.00 4,000,000.00 0.00 500,000.00 - BERKURANG
- Dari P. Kontrol Hydran Pump ke Jockey NYY 3 X 10 mm2 Harga Material 8.00 m Rp. 75,000.00 Rp. 600,000.00 8.00 75,000.00 600,000.00 0.00 75,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 1 ke pompa 1 NYY 3x4 mm2 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 2 ke pompa 2 NYY 3x4 mm3 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 2 ke pompa 1 NYY 3x4 mm4 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 2 ke pompa 2 NYY 3x4 mm5 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari Deep Well Ke Pompa Deep well NYY 3x4mm2 Harga Material 80.00 m Rp. 40,000.00 Rp. 3,200,000.00 80.00 40,000.00 3,200,000.00 0.00 40,000.00 - BERKURANG
2 PEKERJAAN PANEL
- Panel Tegangan Menengah 20KV
Incoming IM LBS 630A Include : Harga Material 1.00 Unit Rp. 63,500,000.00 Rp. 63,500,000.00 1.00 63,500,000.00 63,500,000.00 0.00 63,500,000.00 - BERKURANG
- Switch Cubicle 20KV
- Operating Mechanisem (Manual)
- Natural Interlock Earth-OFF-ON
- Earth Switch With SF6 Gas Tectology
- Voltage Indicator
- Busbar
- Heater
Outgoing QM LBS 630A Harga Material 1.00 bh Rp. 74,500,000.00 Rp. 74,500,000.00 1.00 74,500,000.00 74,500,000.00 0.00 74,500,000.00 - BERKURANG
- Switch Cubicle 20KV
- Operating Mechanisem (Manual)
- Natural Interlock Earth-OFF-ON
- Earth Switch With SF6 Gas Tectology
- Fuse 31,5A
- Voltage Indicator
- Busbar
- Heater
Panel Kontrol Pompa Air Bersih Include WLC Panel diset Bekerja
- saling mendukung jika tekanan air rendah dalam beberapa detik Harga Material 2.00 Unit Rp. 34,500,000.00 Rp. 69,000,000.00 2 34,500,000.00 69,000,000.00 0.00 34,500,000.00 - BERKURANG
atau menit kedua pompa berjalan bersamaan
- Panel Kontrol Deep well Pump Include WLC Harga Material 1.00 Unit Rp. 9,000,000.00 Rp. 9,000,000.00 1 9,000,000.00 9,000,000.00 0.00 9,000,000.00 - BERKURANG
- Pentanahan Elektrikal MAX 2 OHM Harga Material 1.00 Titik Rp. 6,800,000.00 Rp. 6,800,000.00 1.00 6,800,000.00 6,800,000.00 0.00 6,800,000.00 - BERKURANG
32
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN
a b c d e f g h (e x g) i j k l m n o p q
- Saklar tunggal AT. 41 14.00 bh Rp. 48,130.50 Rp. 673,827.00 14.00 48,130.50 673,827.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 8.00 Titik Rp. 268,950.00 Rp. 2,151,600.00 8.00 268,950.00 2,151,600.00 TETAP
- Instalasi titik lampu (NYM 3X2,5 mm2 dalam conduit) AT. 46 14.00 Titik Rp. 268,950.00 Rp. 3,765,300.00 14.00 268,950.00 3,765,300.00 TETAP
- Pekerjaan Pentanahan
- Pentanahan Listrik Arus Kuat Harga Material 1.00 Ls Rp. 2,500,000.00 Rp. 2,500,000.00 1.00 2,500,000.00 2,500,000.00 TETAP
- Pentanahan Listrik Arus Lemah Harga Material 1.00 Ls Rp. 2,500,000.00 Rp. 2,500,000.00 1.00 2,500,000.00 2,500,000.00 TETAP
Pompa Deep Well Sumur Dalam Harga Material 1.00 Set Rp. 54,500,000.00 Rp. 54,500,000.00 1.00 54,500,000.00 54,500,000.00 0.00 54,500,000.00 - BERKURANG
Pompa deep well 4Kw/5.5HP 2900RPM 380V/3Phase
Kapsitas : 9 m3/jam
Hhead : 110 meter, Body : 4"
Pipa HDPE PN 16 dia 1,5" Include Aksesoris Dan pendukung Harga Material 1,120.00 Unit Rp. 127,000.00 Rp. 142,240,000.00 1,120.00 127,000.00 142,240,000.00 0.00 127,000.00 - BERKURANG
lainnya dan galian dan penutupan kemabli
Pipa Tegak ke Roof Tank PVC AW dia 3/4" Harga Material 165.00 m Rp. 20,000.00 Rp. 3,300,000.00 165.00 20,000.00 3,300,000.00 0.00 20,000.00 - BERKURANG
Pemasangan Panel Control WLC Pengengontrol Selenoide Valve Harga Material 19.00 bh Rp. 1,500,000.00 Rp. 28,500,000.00 19.00 1,500,000.00 28,500,000.00 0.00 1,500,000.00 - BERKURANG
Pemasangan Selenoid Valve 220VAC Harga Material 1.00 Set Rp. 2,500,000.00 Rp. 2,500,000.00 1.00 2,500,000.00 2,500,000.00 0.00 2,500,000.00 - BERKURANG
Selenoid Valve 220 VAC Steel 2 Buah Harga Material
Gate Valve 3/4 " Steel 6 buah Harga Material
Harga Material
- Pekerjaan Instalasi Pipa Sumur Dalam Harga Material
Pembuatan Sumur Dalam Harga Material 60.00 m Rp. 300,000.00 Rp. 18,000,000.00 60.00 300,000.00 18,000,000.00 0.00 300,000.00 - BERKURANG
Pipa Casing PVC AW Dia 6" Harga Material 60.00 m Rp. 305,000.00 Rp. 18,300,000.00 60.00 305,000.00 18,300,000.00 0.00 305,000.00 - BERKURANG
Pipa PVC AW Dia 2" Incude Aksesoris & pendukung lainnya Harga Material 70.00 m Rp. 60,000.00 Rp. 4,200,000.00 70.00 60,000.00 4,200,000.00 0.00 60,000.00 - BERKURANG
6 Test Comissioning
Test Comissioning Harga Material 1.00 Ls Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP
TOTAL JUMLAH HARGA PEKERJAAN GENSET Rp. 3,192,452,387.92 250,246,542.09 2,600,099,251.15 770,099,678.87
33
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN PAGAR KAWASAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
JUMLAH Rp 1,820,271,200.76
34
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN PAGAR KAWASAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
a b c d e f g h (e x g ) i j k l m n o p q
I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Sewa Pagar Keliling Kawasan BLK A.2.2.1.4. 100.00 m' Rp. 479,381.00 Rp. 47,938,100.00 100.00 479,381.00 47,938,100.00 TETAP
- Pekerjaan Bowplank m' Rp. 85,500.00 139.03 85,500.00 11,887,065.00 139.03 85,500.00 11,887,065.00 BERTAMBAH
2 SLOEF
- Type S1 uk 20/25 590.07 m' 451.04 139.03
- Bekisting 2x pakai A.4.1.1.21 147.52 m2 Rp. 284,878.00 Rp. 42,024,490.37 78.00 284,878.00 22,221,196.20 69.52 284,878.00 19,803,294.17 BERKURANG
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 4,109.24 kg Rp. 18,713.20 Rp. 76,896,993.27 3,141.04 18,713.20 58,778,822.59 968.20 18,713.20 18,118,170.68 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 29.50 m3 Rp. 1,406,067.00 Rp. 41,483,897.73 22.55 1,406,067.00 31,709,622.98 6.95 1,406,067.00 9,774,274.75 BERKURANG
3 KOLOM
- Kolom K1 uk. 25x25 4.94 147.52 bh 112.69 34.83
- Bekisting 2x pakai A.4.1.1.22 309.79 m2 Rp. 427,174.00 Rp. 132,332,845.14 236.65 427,174.00 101,092,542.59 73.13 427,174.00 31,240,302.56 BERKURANG
- Pembesian (Besi Polos) 158.24 kg/m3 A.4.1.1.17 7,353.32 kg Rp. 18,713.20 Rp. 137,604,228.64 723.30 18,713.20 13,535,307.29 6,630.02 18,713.20 124,068,921.35 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 46.47 m3 Rp. 1,406,067.00 Rp. 65,337,138.93 41.90 1,406,067.00 58,910,314.25 4.57 1,406,067.00 6,426,824.68 BERKURANG
4 RING BALOK
- Ring Balok uk. 20x20 589.95 m' 138.85
- Bekisting 2x pakai A.4.1.1.23 176.99 m2 Rp. 440,374.00 Rp. 77,939,592.39 121.45 440,374.00 53,481,220.43 55.54 440,374.00 24,458,371.96 BERKURANG
- Pembesian (Besi Polos) 118.20 kg/m3 A.4.1.1.17 2,789.37 kg Rp. 18,713.20 Rp. 52,198,011.60 2,132.87 18,713.20 39,912,743.51 656.50 18,713.20 12,285,268.09 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 23.60 m3 Rp. 1,406,067.00 Rp. 33,180,369.07 18.04 1,406,067.00 25,371,072.95 5.55 1,406,067.00 7,809,296.12 BERKURANG
JUMLAH HARGA PEKERJAAN STRUKTUR PAGAR Rp. 658,997,567.14 2,508,767,922.61 405,012,842.78 2,762,752,646.96
JUMLAH HARGA PEKERJAAN PAGAR KAWASAN Rp. 1,820,271,200.76 2,520,654,987.61 1,344,186,468.20 2,996,739,720.17
35
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN NORMALISASI SEMPADAN SUNGAI
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
JUMLAH Rp 4,019,864,261.95
36
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN NORMALISASI SEMPADAN SUNGAI
TAHUN ANGGARAN : APBN TA. 2021
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 200.00 m' Rp. 479,381.00 Rp. 95,876,200.00 200.00 479,381.00 95,876,200.00 TETAP
- Pek. Pemasangan L Shape K 350 (Retaining Wall) L Shape 1500.1100.100 AT. 01a 499.95 unit Rp. 4,750,105.00 Rp. 2,374,814,994.75
499.95 4,750,105.00 2,374,814,994.75 TETAP
3 PEKERJAAN BRONJONG
- Pek. Pemasangan Bronjong Kawat 3mm (2x1x0.5) Bronjong Kawat 3mm AT. 01b 499.95 unit Rp. 1,083,181.00 Rp. 541,536,340.95
(2x1x0.5) 499.95 1,083,181.00 541,536,340.95 TETAP
37
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
JUMLAH Rp 1,654,993,168.71
38
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 500.00 m' Rp. 479,381.00 Rp. 239,690,500.00 500.00 479,381.00 239,690,500.00 TETAP
JUMLAH HARGA PEKERJAAN JALAN, SALURAN DAN PARKIR Rp. 1,415,302,668.71 838,750,000.01 449,141,797.05 1,804,910,871.67
39
KONTRAKTOR PELAKSANA : PT MEGA BINTANG ABADI
KONSULTAN PENGAWAS : PT. ARPHALA WIRATAMA CONSULTANT KSO CV. DUTA ENGINEERING CONSULTANT
REFF. GAMBAR TYPE Panjang Jumlah UNIT Jumlah Jumlah Sisa Sisa
NO. LOKASI NO. TUL TYPE D DIMENSION (m) Potongan Potongan JUMLAH WEIGHT WEIGHT Potongan Pembagi Pembagi Besi Potongan Total
a b c d Hook (m) pertitik TITIK (kg/m) (kg) (Buah) Besi utuh BTG (m) Pembagi (m) Btg Besi
A PILECAP GERBANG
1 Pilecap-1 P1 (100x100x25) P1 Tulangan Utama A 12 0.92 0.17 0.17 0.10 1.36 7.00 8 0.89 74.59 56.00 8.00 0.98 0.14 7.00
Tulangan Utama A 12 0.92 0.17 0.17 0.10 1.36 7.00 8 0.89 74.59 56.00 8.00 0.98 0.14 7.00
Tulangan Atas A 12 0.92 0.05 0.05 0.10 1.12 7.00 8 0.89 59.67 56.00 10.00 0.45 0.08 5.60
Tulangan Atas A 12 0.92 0.05 0.05 0.10 1.12 7.00 8 0.89 59.67 56.00 10.00 0.45 0.08 5.60
268.53
2 Pilecap-2 P2 (55x80x25) P2 Tulangan Utama A 12 0.72 0.17 0.17 0.10 1.16 5.00 7 0.89 37.30 35.00 10.00 0.14 0.04 3.50
Tulangan Utama A 12 0.47 0.17 0.17 0.10 0.91 4.00 7 0.89 22.95 28.00 13.00 0.03 0.01 2.15
Tulangan Atas A 12 0.72 0.05 0.05 0.10 0.92 5.00 7 0.89 28.69 35.00 13.00 0.01 0.00 2.69
Tulangan Atas A 12 0.47 0.05 0.05 0.10 0.67 4.00 7 0.89 17.55 28.00 17.00 0.06 0.04 1.65
106.49
3 PEDESTAL KOLOM Kolom (K1) 30 X 30 X 248 K1 Tulangan Utama A 16 2.48 0.25 0.40 0.30 0.10 3.53 8.00 8 1.58 403.97 64.00 3.00 10.03 0.47 21.33
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 17.00 8 0.62 100.69 136.00 10.00 8.16 0.60 13.60
504.66
Kolom K2 uk. 20x20 K2 Tulangan Utama A 12 2.48 0.25 0.40 0.30 0.10 3.53 4.00 8 0.89 113.66 32.00 3.00 5.01 0.47 10.67
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 17.00 8 0.62 62.93 136.00 16.00 1.36 0.16 8.50
176.60
SLOEF Type S1 uk 20/25 S1 Tulangan Utama A 12 2.24 0.07 0.10 2.41 10.00 1 0.89 26.64 10.00 4.00 1.48 0.59 2.50
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 15.00 1 0.62 11.11 15.00 10.00 0.90 0.60 1.50
Tulangan Utama A 12 2.00 0.07 0.10 2.17 10.00 3 0.89 79.92 30.00 4.00 6.23 0.83 7.50
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 14.00 3 0.62 31.10 42.00 10.00 2.52 0.60 4.20
Tulangan Utama A 12 2.20 0.07 0.10 2.37 10.00 2 0.89 53.28 20.00 4.00 3.15 0.63 5.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 15.00 2 0.62 22.21 30.00 10.00 1.80 0.60 3.00
224.25
Type S2 uk 15/20 S2 Tulangan Utama A 10 2.20 0.30 0.10 2.60 4.00 2 0.62 14.81 8.00 4.00 0.80 0.40 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 15.00 2 0.62 12.34 30.00 18.00 0.80 0.48 1.67
Tulangan Utama A 10 1.10 0.30 0.10 1.50 4.00 4 0.62 14.81 16.00 8.00 - - 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 4 0.62 13.16 32.00 18.00 0.85 0.48 1.78
Tulangan Utama A 10 1.20 0.30 0.10 1.60 4.00 3 0.62 12.69 12.00 7.00 0.20 0.11 1.71
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 3 0.62 9.87 24.00 18.00 0.64 0.48 1.33
Tulangan Utama A 10 1.64 0.30 0.10 2.04 4.00 5 0.62 29.62 20.00 5.00 1.44 0.36 4.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 11.00 5 0.62 22.62 55.00 18.00 1.47 0.48 3.06
Tulangan Utama A 10 1.40 0.30 0.10 1.80 4.00 1 0.62 4.94 4.00 6.00 0.13 0.20 0.67
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 10.00 1 0.62 4.11 10.00 18.00 0.27 0.48 0.56
138.97
KOLOM LT.1 Kolom K1 uk. 30x30 K1 Tulangan Utama A 16 7.50 0.30 0.10 7.90 8.00 4 1.58 605.95 32.00 1.00 131.20 4.10 32.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 50.00 4 0.62 148.08 200.00 10.00 12.00 0.60 20.00
Tulangan Utama A 16 3.50 0.30 0.10 3.90 8.00 4 1.58 201.98 32.00 3.00 1.07 0.10 10.67
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 24.00 4 0.62 71.08 96.00 10.00 5.76 0.60 9.60
1,027.09
Kolom K2 uk. 20x20 K2 Tulangan Utama A 12 7.00 0.15 0.40 0.10 7.65 4.00 1 0.89 42.62 4.00 1.00 17.40 4.35 4.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 47.00 1 0.62 21.75 47.00 16.00 0.47 0.16 2.94
Tulangan Utama A 12 6.40 0.15 0.40 0.10 7.05 4.00 1 0.89 42.62 4.00 1.00 19.80 4.95 4.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 43.00 1 0.62 19.90 43.00 16.00 0.43 0.16 2.69
Tulangan Utama A 12 5.80 0.15 0.40 0.10 6.45 4.00 1 0.89 42.62 4.00 1.00 22.20 5.55 4.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 39.00 1 0.62 18.05 39.00 16.00 0.39 0.16 2.44
Tulangan Utama A 12 5.20 0.15 0.40 0.10 5.85 4.00 1 0.89 21.31 4.00 2.00 0.30 0.15 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 35.00 1 0.62 16.20 35.00 16.00 0.35 0.16 2.19
Tulangan Utama A 12 4.60 0.15 0.40 0.10 5.25 4.00 1 0.89 21.31 4.00 2.00 1.50 0.75 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 31.00 1 0.62 14.35 31.00 16.00 0.31 0.16 1.94
Tulangan Utama A 12 4.00 0.15 0.40 0.10 4.65 4.00 1 0.89 21.31 4.00 2.00 2.70 1.35 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 27.00 1 0.62 12.49 27.00 16.00 0.27 0.16 1.69
Tulangan Utama A 12 3.40 0.15 0.40 0.10 4.05 4.00 1 0.89 21.31 4.00 2.00 3.90 1.95 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 23.00 1 0.62 10.64 23.00 16.00 0.23 0.16 1.44
326.49
Kolom KP uk. 15x15 KP Tulangan Utama A 10 3.50 0.15 0.10 3.75 4.00 6 0.62 59.23 24.00 3.00 2.00 0.25 8.00
Sengkang B 10 0.11 0.11 0.11 0.11 0.10 0.54 24.00 6 0.62 48.46 144.00 22.00 0.79 0.12 6.55
Tulangan Utama A 10 7.50 0.15 0.10 7.75 4.00 2 0.62 59.23 8.00 1.00 34.00 4.25 8.00
Sengkang B 10 0.11 0.11 0.11 0.11 0.10 0.54 50.00 2 0.62 33.65 100.00 22.00 0.55 0.12 4.55
200.58
BALOK Balok B1 uk. 20x25 B1 Tulangan Utama A 12 2.24 0.30 0.10 2.64 10.00 1 0.89 26.64 10.00 4.00 0.90 0.36 2.50
Sengkang B 10 0.16 0.21 0.16 0.21 0.10 0.84 15.00 1 0.62 11.11 15.00 10.00 5.40 3.60 1.50
Tulangan Utama A 12 2.00 0.30 0.10 2.40 10.00 3 0.89 79.92 30.00 4.00 4.50 0.60 7.50
Sengkang B 10 0.16 0.21 0.16 0.21 0.10 0.84 14.00 3 0.62 31.10 42.00 10.00 15.12 3.60 4.20
Tulangan Utama A 12 2.20 0.30 0.10 2.60 10.00 2 0.89 53.28 20.00 4.00 2.00 0.40 5.00
Sengkang B 10 0.16 0.21 0.16 0.21 0.10 0.84 15.00 2 0.62 22.21 30.00 10.00 10.80 3.60 3.00
224.25
B2 Tulangan Utama A 10 2.20 0.30 0.10 2.60 4.00 2 0.62 14.81 8.00 4.00 0.80 0.40 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 15.00 2 0.62 12.34 30.00 18.00 0.80 0.48 1.67
Tulangan Utama A 10 1.10 0.30 0.10 1.50 4.00 4 0.62 14.81 16.00 8.00 - - 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 4 0.62 13.16 32.00 18.00 0.85 0.48 1.78
Tulangan Utama A 10 1.20 0.30 0.10 1.60 4.00 3 0.62 12.69 12.00 7.00 0.20 0.11 1.71
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 3 0.62 9.87 24.00 18.00 0.64 0.48 1.33
Tulangan Utama A 10 1.64 0.30 0.10 2.04 4.00 5 0.62 29.62 20.00 5.00 1.44 0.36 4.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 11.00 5 0.62 22.62 55.00 18.00 1.47 0.48 3.06
Tulangan Utama A 10 1.40 0.30 0.10 1.80 4.00 1 0.62 4.94 4.00 6.00 0.13 0.20 0.67
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 10.00 1 0.62 4.11 10.00 18.00 0.27 0.48 0.56
138.97
PLAT BETON Tulangan Atas V A 10 4.35 0.10 4.45 16.00 1 0.62 59.23 16.00 2.00 12.40 1.55 8.00
Tulangan Atas H A 10 2.40 0.10 2.50 29.00 1 0.62 53.68 29.00 4.00 3.63 0.50 7.25
Tulangan Bawah V A 10 4.35 0.10 4.45 16.00 1 0.62 59.23 16.00 2.00 12.40 1.55 8.00
Tulangan Bawah H A 10 2.40 0.10 2.50 29.00 1 0.62 53.68 29.00 4.00 3.63 0.50 7.25
225.82
KOLOM LT.2 Kolom K1 uk. 30x30 K1 Tulangan Utama A 16 4.00 0.30 0.10 4.40 8.00 4 1.58 302.98 32.00 2.00 25.60 1.60 16.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 27.00 4 0.62 79.96 108.00 10.00 6.48 0.60 10.80
382.94
RING BALOK Ring Balok uk. 15x20 RB2 Tulangan Utama A 10 9.60 0.30 0.10 10.00 4.00 1 0.62 29.62 4.00 1.00 8.00 2.00 4.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 64.00 1 0.62 26.33 64.00 18.00 1.71 0.48 3.56
55.94
1 Pilecap-1 P1 (160x160x30) P1 Tulangan Utama A 16 1.52 0.22 0.22 0.10 2.06 10.00 27 1.58 1,022.54 270.00 5.00 18.36 0.34 54.00
Tulangan Utama A 16 1.52 0.22 0.22 0.10 2.06 10.00 27 1.58 1,022.54 270.00 5.00 18.36 0.34 54.00
Tulangan Atas A 16 1.52 0.10 0.10 0.10 1.82 10.00 27 1.58 852.12 270.00 6.00 8.10 0.18 45.00
Tulangan Atas A 16 1.52 0.10 0.10 0.10 1.82 10.00 27 1.58 852.12 270.00 6.00 8.10 0.18 45.00
3,749.33
2 PEDESTAL KOLOM Kolom K1 uk. 60x60 K1 Tulangan Utama A 16 2.50 0.46 0.53 0.38 0.10 3.97 10.00 27 1.58 1,704.24 270.00 3.00 2.70 0.03 90.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 14.00 27 0.62 279.87 378.00 10.00 22.68 0.60 37.80
1,984.11
3 SLOEF Type S1 uk 35/75 S1 Tulangan Utama A 16 8.00 0.56 0.30 0.10 8.96 9.00 16 1.58 2,726.78 144.00 1.00 437.76 3.04 144.00
Tulangan Peminggang B 10 8.00 0.30 0.10 8.40 2.00 16 0.62 236.93 32.00 1.00 115.20 3.60 32.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 54.00 16 0.62 1,279.41 864.00 5.00 224.64 1.30 172.80
Tulangan Utama A 16 6.00 0.56 0.30 0.10 6.96 9.00 11 1.58 1,874.66 99.00 1.00 498.96 5.04 99.00
Tulangan Peminggang B 10 6.00 0.30 0.10 6.40 2.00 11 0.62 162.89 22.00 1.00 123.20 5.60 22.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 40.00 11 0.62 651.55 440.00 5.00 114.40 1.30 88.00
Tulangan Utama A 16 5.00 0.56 0.30 0.10 5.96 9.00 8 1.58 681.70 72.00 2.00 1.44 0.04 36.00
Tulangan Peminggang B 10 5.00 0.30 0.10 5.40 2.00 8 0.62 59.23 16.00 2.00 4.80 0.60 8.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 34.00 8 0.62 402.78 272.00 5.00 70.72 1.30 54.40
Tulangan Utama A 16 4.00 0.56 0.30 0.10 4.96 9.00 6 1.58 511.27 54.00 2.00 28.08 1.04 27.00
Tulangan Peminggang B 10 4.00 0.30 0.10 4.40 2.00 6 0.62 44.42 12.00 2.00 9.60 1.60 6.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 27.00 6 0.62 239.89 162.00 5.00 42.12 1.30 32.40
Tulangan Utama A 16 2.00 0.56 0.30 0.10 2.96 9.00 5 1.58 213.03 45.00 4.00 0.45 0.04 11.25
Tulangan Peminggang B 10 2.00 0.30 0.10 2.40 2.00 5 0.62 18.51 10.00 4.00 1.50 0.60 2.50
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 14.00 5 0.62 103.66 70.00 5.00 18.20 1.30 14.00
9,206.71
Type S1 uk 25/50 S2 Tulangan Utama A 10 8.00 0.30 0.10 8.40 5.00 2 0.62 74.04 10.00 1.00 36.00 3.60 10.00
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 46.00 2 0.62 85.15 92.00 8.00 5.52 0.48 11.50
Tulangan Utama A 10 4.00 0.30 0.10 4.40 5.00 5 0.62 92.55 25.00 2.00 20.00 1.60 12.50
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 23.00 5 0.62 106.43 115.00 8.00 6.90 0.48 14.38
Tulangan Utama A 10 3.00 0.30 0.10 3.40 5.00 1 0.62 12.34 5.00 3.00 1.00 0.60 1.67
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 17.00 1 0.62 15.73 17.00 8.00 1.02 0.48 2.13
Tulangan Utama A 10 1.20 0.30 0.10 1.60 5.00 2 0.62 10.58 10.00 7.00 0.16 0.11 1.43
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 6.00 2 0.62 11.11 12.00 8.00 0.72 0.48 1.50
407.93
4 KOLOM LT.1 Kolom K1 uk. 60x60 K1 Tulangan Utama A 19 4.00 0.40 0.49 0.10 4.99 16.00 27 2.22 5,762.02 432.00 2.00 218.16 1.01 216.00
Tulangan Utama Stek A 19 1.00 0.49 0.10 1.59 16.00 27 2.22 1,646.29 432.00 7.00 7.67 0.12 61.71
Sengkang B 13 0.56 0.56 0.56 0.56 0.10 2.34 24.00 27 1.04 1,617.41 648.00 5.00 38.88 0.30 129.60
9,025.71
Kolom KP uk. 15x15 KP Tulangan Utama A 10 4.00 0.20 0.10 4.30 4.00 23 1.04 574.08 92.00 2.00 78.20 1.70 46.00
Sengkang B 8 0.14 0.14 0.14 0.14 0.10 0.66 24.00 23 0.40 145.36 552.00 18.00 3.68 0.12 30.67
719.44
5 BALOK Balok B1 uk. 40x70 B1 (8Mtr) Tulangan Utama A 19 8.00 0.52 0.30 0.10 8.92 6.00 14 2.22 2,240.78 84.00 1.00 258.72 3.08 84.00
Tulangan Utama Tump. 19 2.00 0.56 0.30 0.10 2.96 3.00 14 2.22 280.10 42.00 4.00 0.42 0.04 10.50
Tulangan Utama Lap. B 19 4.04 0.56 0.30 0.10 5.00 5.00 14 2.22 1,867.32 70.00 1.00 490.00 7.00 70.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 48.00 14 1.04 1,677.31 672.00 5.00 174.72 1.30 134.40
B1 (6Mtr) Tulangan Utama A 19 6.00 0.52 0.30 0.10 6.92 6.00 9 2.22 1,440.50 54.00 1.00 274.32 5.08 54.00
Tulangan Utama Tump. 19 1.50 0.56 0.30 0.10 2.46 3.00 9 2.22 180.06 27.00 4.00 3.65 0.54 6.75
Tulangan Utama Lap. B 19 3.00 0.56 0.30 0.10 3.96 5.00 9 2.22 400.14 45.00 3.00 0.60 0.04 15.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 34.00 9 1.04 763.78 306.00 5.00 79.56 1.30 61.20
B1 (5Mtr) Tulangan Utama A 19 5.00 0.52 0.30 0.10 5.92 6.00 7 2.22 1,120.39 42.00 1.00 255.36 6.08 42.00
Tulangan Utama Tump. 19 1.25 0.56 0.30 0.10 2.21 3.00 7 2.22 112.04 21.00 5.00 0.80 0.19 4.20
Tulangan Utama Lap. B 19 2.50 0.56 0.30 0.10 3.46 5.00 7 2.22 311.22 35.00 3.00 6.30 0.54 11.67
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 7 1.04 489.22 196.00 5.00 50.96 1.30 39.20
B1 (4Mtr) Tulangan Utama A 19 4.00 0.52 0.30 0.10 4.92 6.00 6 2.23 963.36 36.00 1.00 254.88 7.08 36.00
Tulangan Utama Tump. 19 1.00 0.56 0.30 0.10 1.96 3.00 6 2.23 96.34 18.00 5.00 1.58 0.44 3.60
Tulangan Utama Lap. B 19 2.00 0.56 0.30 0.10 2.96 5.00 6 2.23 267.60 30.00 3.00 10.40 1.04 10.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 6 1.04 419.33 168.00 5.00 43.68 1.30 33.60
B1 (2Mtr) Tulangan Utama A 19 2.00 0.52 0.30 0.10 2.92 6.00 5 2.23 200.70 30.00 4.00 0.60 0.08 7.50
Tulangan Utama Tump. 19 0.50 0.56 0.30 0.10 1.46 3.00 5 2.23 50.18 15.00 8.00 0.07 0.04 1.88
Tulangan Utama Lap. B 19 1.00 0.56 0.30 0.10 1.96 5.00 5 2.23 111.50 25.00 6.00 0.17 0.04 4.17
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 5 1.04 349.44 140.00 5.00 36.40 1.30 28.00
B1 (3Mtr) Tulangan Utama A 19 3.00 0.52 0.30 0.10 3.92 6.00 3 2.23 160.56 18.00 3.00 0.48 0.08 6.00
Tulangan Utama Tump. 19 0.85 0.56 0.30 0.10 1.81 3.00 3 2.23 40.14 9.00 6.00 0.29 0.19 1.50
Tulangan Utama Lap. B 19 2.25 0.56 0.30 0.10 3.21 5.00 3 2.23 133.80 15.00 3.00 3.95 0.79 5.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 3 1.04 209.66 84.00 5.00 21.84 1.30 16.80
13,885.47
Balok Anak B2 uk. 30x50 B2 (8Mtr) Tulangan Utama A 19 8.00 0.52 0.30 0.10 8.92 6.00 11 2.23 1,766.16 66.00 1.00 203.28 3.08 66.00
Tulangan Utama Tump. 19 2.00 0.56 0.30 0.10 2.96 2.00 11 2.23 147.18 22.00 4.00 0.22 0.04 5.50
Tulangan Utama Lap. B 19 4.04 0.56 0.30 0.10 5.00 3.00 11 2.23 441.54 33.00 2.00 16.50 1.00 16.50
Tulangan Peminggang C 13 8.00 0.30 0.10 8.40 2.00 11 2.23 588.72 22.00 1.00 79.20 3.60 22.00
Sengkang D 13 0.26 0.46 0.26 0.46 0.10 1.54 48.00 11 1.04 941.35 528.00 7.00 92.02 1.22 75.43
B2 (6Mtr) Tulangan Utama A 19 6.00 0.52 0.30 0.10 6.92 6.00 10 2.23 1,605.60 60.00 1.00 304.80 5.08 60.00
Tulangan Utama Tump. 19 1.00 0.56 0.30 0.10 1.96 2.00 10 2.23 89.20 20.00 6.00 0.13 0.04 3.33
Tulangan Utama Lap. B 19 2.00 0.56 0.30 0.10 2.96 3.00 10 2.23 200.70 30.00 4.00 0.30 0.04 7.50
Tulangan Peminggang C 13 6.00 0.30 0.10 6.40 2.00 10 2.23 535.20 20.00 1.00 112.00 5.60 20.00
Sengkang D 13 0.26 0.46 0.26 0.46 0.10 1.54 36.00 10 1.04 641.83 360.00 7.00 62.74 1.22 51.43
B2 (4Mtr) Tulangan Utama A 19 4.00 0.52 0.30 0.10 4.92 6.00 4 2.23 321.12 24.00 2.00 12.96 1.08 12.00
Tulangan Utama Tump. 19 0.85 0.56 0.30 0.10 1.81 2.00 4 2.23 35.68 8.00 6.00 0.25 0.19 1.33
Tulangan Utama Lap. B 19 1.60 0.56 0.30 0.10 2.56 3.00 4 2.23 80.28 12.00 4.00 1.32 0.44 3.00
Tulangan Peminggang C 13 4.00 0.30 0.10 4.40 2.00 4 2.23 107.04 8.00 2.00 6.40 1.60 4.00
Sengkang D 13 0.26 0.46 0.26 0.46 0.10 1.54 36.00 4 1.04 256.73 144.00 7.00 25.10 1.22 20.57
7,758.33
Balok Anak B3 uk. 15x20 B3 (4Mtr) Tulangan Utama A 10 4.00 0.10 0.10 4.20 5.00 2 0.62 37.02 10.00 2.00 9.00 1.80 5.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 20.00 2 0.40 10.53 40.00 18.00 1.07 0.48 2.22
B3 (3Mtr) Tulangan Utama A 10 3.00 0.10 0.10 3.20 5.00 2 0.62 24.68 10.00 3.00 2.67 0.80 3.33
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 20.00 2 0.40 10.53 40.00 18.00 1.07 0.48 2.22
82.77
KOLOM LT.2 Kolom K1 uk. 60x60 K1 Tulangan Utama A 19 4.00 0.40 0.49 0.10 4.99 16.00 27 2.22 5,762.02 432.00 2.00 218.16 1.01 216.00
Tulangan Utama Stek A 19 1.00 0.49 0.10 1.59 16.00 27 2.22 1,646.29 432.00 7.00 7.67 0.12 61.71
Sengkang B 13 0.56 0.56 0.56 0.56 0.10 2.34 24.00 27 1.04 1,617.41 648.00 5.00 38.88 0.30 129.60
9,025.71
Kolom KP uk. 15x15 KP Tulangan Utama A 10 4.00 0.20 0.10 4.30 4.00 23 0.62 340.58 92.00 2.00 78.20 1.70 46.00
Sengkang B 8 0.14 0.14 0.14 0.14 0.10 0.66 24.00 23 0.40 145.36 552.00 18.00 3.68 0.12 30.67
485.94
RING BALOK Ring Balok uk. 30x65 RB1 (8Mtr) Tulangan Utama A 16 8.00 0.40 0.10 8.50 7.00 14 1.58 1,855.73 98.00 1.00 343.00 3.50 98.00
Tulangan Peminggang B 10 8.00 0.20 0.10 8.30 2.00 14 0.62 207.31 28.00 1.00 103.60 3.70 28.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 14 0.62 777.42 840.00 8.00 8.40 0.08 105.00
RB1 (6Mtr) Tulangan Utama A 16 6.00 0.40 0.10 6.50 7.00 9 3.85 2,912.87 63.00 1.00 346.50 5.50 63.00
Tulangan Peminggang B 10 6.00 0.20 0.10 6.30 2.00 9 0.62 133.27 18.00 1.00 102.60 5.70 18.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 9 0.62 499.77 540.00 8.00 5.40 0.08 67.50
RB1 (5Mtr) Tulangan Utama A 16 5.00 0.40 0.10 5.50 7.00 7 7.99 2,349.06 49.00 2.00 12.25 0.50 24.50
Tulangan Peminggang B 10 5.00 0.20 0.10 5.30 2.00 7 0.62 51.83 14.00 2.00 4.90 0.70 7.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 7 0.62 388.71 420.00 8.00 4.20 0.08 52.50
RB1 (4Mtr) Tulangan Utama A 16 4.00 0.40 0.10 4.50 7.00 4 0.62 104.16 28.00 2.00 21.00 1.50 14.00
Tulangan Peminggang B 10 4.00 0.20 0.10 4.30 2.00 4 0.62 29.62 8.00 2.00 6.80 1.70 4.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 4 0.62 222.12 240.00 8.00 2.40 0.08 30.00
RB1 (2Mtr) Tulangan Utama A 16 2.00 0.40 0.10 2.50 7.00 6 1.58 199.08 42.00 4.00 5.25 0.50 10.50
Tulangan Peminggang B 10 2.00 0.20 0.10 2.30 2.00 6 0.62 22.21 12.00 4.00 2.10 0.70 3.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 6 0.62 333.18 360.00 8.00 3.60 0.08 45.00
10,086.34
Ring Balok uk. 25x50 RB2 (8Mtr) Tulangan Utama A 16 8.00 0.40 0.10 8.50 7.00 8 1.58 1,061.76 56.00 1.00 196.00 3.50 56.00
Tulangan Peminggang B 10 8.00 0.20 0.10 8.30 2.00 8 0.62 118.46 16.00 1.00 59.20 3.70 16.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 8 0.62 444.24 480.00 8.00 28.80 0.48 60.00
RB2 (6Mtr) Tulangan Utama A 16 6.00 0.40 0.10 6.50 7.00 2 1.58 265.44 14.00 1.00 77.00 5.50 14.00
Tulangan Peminggang B 10 6.00 0.20 0.10 6.30 2.00 2 0.62 29.62 4.00 1.00 22.80 5.70 4.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 2 0.62 111.06 120.00 8.00 7.20 0.48 15.00
RB2 (5Mtr) Tulangan Utama A 16 5.00 0.40 0.10 5.50 7.00 2 1.58 132.72 14.00 2.00 3.50 0.50 7.00
Tulangan Peminggang B 10 5.00 0.20 0.10 5.30 2.00 2 0.62 14.81 4.00 2.00 1.40 0.70 2.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 2 0.62 111.06 120.00 8.00 7.20 0.48 15.00
RB2 (4Mtr) Tulangan Utama A 16 4.00 0.40 0.10 4.50 7.00 5 1.58 331.80 35.00 2.00 26.25 1.50 17.50
Tulangan Peminggang B 10 4.00 0.20 0.10 4.30 2.00 5 0.62 37.02 10.00 2.00 8.50 1.70 5.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 5 0.62 277.65 300.00 8.00 18.00 0.48 37.50
RB2 (2Mtr) Tulangan Utama A 16 2.00 0.40 0.10 2.50 7.00 6 1.58 199.08 42.00 4.00 5.25 0.50 10.50
Tulangan Peminggang B 10 2.00 0.20 0.10 2.30 2.00 6 0.62 22.21 12.00 4.00 2.10 0.70 3.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 6 0.62 333.18 360.00 8.00 21.60 0.48 45.00
3,490.11
Ring Balok uk. 15x20 RB3 (6mtr) Tulangan Utama A 10 6.00 0.10 0.10 6.20 5.00 1 0.62 37.02 5.00 1.00 29.00 5.80 5.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 28.00 1 0.40 7.37 28.00 18.00 0.75 0.48 1.56
RB3 (4mtr) Tulangan Utama A 10 4.00 0.10 0.10 4.20 5.00 1 0.62 18.51 5.00 2.00 4.50 1.80 2.50
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 28.00 1 0.40 7.37 28.00 18.00 0.75 0.48 1.56
RB3 (2mtr) Tulangan Utama A 10 2.00 0.10 0.10 2.20 5.00 5 0.62 37.02 25.00 5.00 1.00 0.20 5.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 28.00 5 0.40 36.87 140.00 18.00 3.73 0.48 7.78
144.16
D RUMAH GENSET (POWER HOUSE)
1 SLOEF Type S1 uk 25/40 S1 (5Mtr) Tulangan Utama A 16 5.00 0.30 0.10 5.40 6.00 3 1.58 170.42 18.00 2.00 5.40 0.60 9.00
Tulangan Utama Tump. B 16 1.25 0.30 0.10 1.65 2.00 3 1.58 16.23 6.00 7.00 0.06 0.06 0.86
Tulangan Utama Lap. C 16 2.25 0.30 0.10 2.65 2.00 3 1.58 28.40 6.00 4.00 0.53 0.35 1.50
Tulangan Peminggang D 12 5.00 0.30 0.10 5.40 2.00 3 0.89 31.97 6.00 2.00 1.80 0.60 3.00
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 33.00 3 0.40 52.14 99.00 9.00 9.24 0.84 11.00
S1 (3.5Mtr) Tulangan Utama A 16 3.50 0.30 0.10 3.90 6.00 14 1.58 530.21 84.00 3.00 2.80 0.10 28.00
Tulangan Utama Tump. B 16 0.85 0.30 0.10 1.25 2.00 14 1.58 58.91 28.00 9.00 0.26 0.08 3.11
Tulangan Utama Lap. C 16 1.90 0.30 0.10 2.30 2.00 14 1.58 106.04 28.00 5.00 0.56 0.10 5.60
Tulangan Peminggang D 12 3.50 0.30 0.10 3.90 2.00 14 0.89 99.46 28.00 3.00 0.93 0.10 9.33
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 23.00 14 0.40 169.59 322.00 9.00 30.05 0.84 35.78
1,263.37
2 KOLOM LT.1 Kolom K1 uk. 30x30 K1 Tulangan Utama A 16 3.80 0.10 3.90 16.00 12 1.58 1,817.86 192.00 2.00 201.60 2.10 96.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 24.00 12 0.62 426.47 288.00 5.00 362.88 6.30 57.60
2,244.33
3 BALOK Balok BK1 uk. 25x40 B1 (5Mtr) Tulangan Utama A 16 5.00 0.30 0.10 5.40 6.00 3 1.58 170.42 18.00 2.00 5.40 0.60 9.00
Tulangan Utama Tump. B 16 1.25 0.30 0.10 1.65 2.00 3 1.58 16.23 6.00 7.00 0.06 0.06 0.86
Tulangan Utama Lap. C 16 2.25 0.30 0.10 2.65 2.00 3 1.58 28.40 6.00 4.00 0.53 0.35 1.50
Tulangan Peminggang D 12 5.00 0.30 0.10 5.40 2.00 3 0.89 31.97 6.00 2.00 1.80 0.60 3.00
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 33.00 3 0.40 52.14 99.00 9.00 9.24 0.84 11.00
B1 (3.5Mtr) Tulangan Utama A 16 3.50 0.30 0.10 3.90 6.00 14 1.58 530.21 84.00 3.00 2.80 0.10 28.00
Tulangan Utama Tump. B 16 0.85 0.30 0.10 1.25 2.00 14 1.58 58.91 28.00 9.00 0.26 0.08 3.11
Tulangan Utama Lap. C 16 1.90 0.30 0.10 2.30 2.00 14 1.58 106.04 28.00 5.00 0.56 0.10 5.60
Tulangan Peminggang D 12 3.50 0.30 0.10 3.90 2.00 14 0.89 99.46 28.00 3.00 0.93 0.10 9.33
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 23.00 14 0.40 169.59 322.00 9.00 30.05 0.84 35.78
1,263.37
4 PLAT BETON ATAP Tulangan Atas X A 10 13.00 0.10 13.10 60.00 1 0.62 488.18 60.00 0.91 5.72 0.09 65.93
Tulangan Atas Y A 10 9.10 0.10 9.20 86.00 1 0.62 636.74 86.00 1.00 240.80 2.80 86.00
Tulangan Bawah X A 10 13.00 0.10 13.10 60.00 1 0.62 488.18 60.00 0.91 5.72 0.09 65.93
Tulangan Bawah Y A 10 9.10 0.10 9.20 86.00 1 0.62 636.74 86.00 1.00 240.80 2.80 86.00
2,249.84
5 Pilecap P1 (120x120x40) P1 Tulangan Utama A 16 1.12 0.32 0.32 0.10 1.86 12.00 12 1.58 454.46 144.00 6.00 3.36 0.14 24.00
Tulangan Utama A 16 1.12 0.32 0.32 0.10 1.86 12.00 12 1.58 454.46 144.00 6.00 3.36 0.14 24.00
Tulangan Atas A 16 1.12 0.10 0.10 0.10 1.42 12.00 12 1.58 340.85 144.00 8.00 1.44 0.08 18.00
Tulangan Atas A 16 1.12 0.10 0.10 0.10 1.42 12.00 12 1.58 340.85 144.00 8.00 1.44 0.08 18.00
1,590.62
6 PEDESTAL KOLOM Kolom Pedestal uk. 30x30 K1 Tulangan Utama A 16 2.35 0.34 0.10 2.79 10.00 12 1.58 568.08 120.00 4.00 6.30 0.21 30.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 14.00 12 0.62 124.39 168.00 10.00 10.08 0.60 16.80
692.47
BESI
BACK UP DATA QUANTITY MC. 01
Nama Paket :
No. Kontrak :
No. Mata Pembayaran :
Item Pekerjaan :
Satuan : M3