JADWAL WAKTU PELAKSANAAN (TIME SCHEDULLE) KURVA S

PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT


TAHUN ANGGARAN 2022
BOBOT WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO URAIAN PEKERJAAN KET
MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26
%
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180

1 I. PEKERJAAN PENDAHULUAN 2.11 1.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 100%

2 PEKERJAAN GERBANG UTAMA ###


PEKERJAAN PENDAHULUAN 0.07 0.07
PEKERJAAN STRUKTUR 1.36 0.45 0.45 0.45

Pelaksanaan Selama 180 Hari Kalender


PEKERJAAN ARSITEKTUR 2.94 0.42 0.42 0.42 0.42 0.42 0.42 0.42

SERAH TERIMA PERTAMA (PHO)


PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 0.31 0.04 0.04 0.04 0.04 0.04 0.04 0.04

3 PEKERJAAN GEDUNG KANTOR UTAMA


PEKERJAAN PENDAHULUAN 2.58 2.58
PEKERJAAN STRUKTUR 10.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PEKERJAAN ARSITEKTUR 10.70 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 3.16 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24

4 PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN


PEKERJAAN PENDAHULUAN 1.48 1.48
PEKERJAAN STRUKTUR 13.56 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36
PEKERJAAN ARSITEKTUR 12.20 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 2.62 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20

5 PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1)


PEKERJAAN PENDAHULUAN 0.14 0.14
PEKERJAAN STRUKTUR 1.34 0.22 0.22 0.22 0.22 0.22 0.22
PEKERJAAN ARSITEKTUR 0.78 0.13 0.13 0.13 0.13 0.13 0.13
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 0.07 0.01 0.01 0.01 0.01 0.01 0.01 0.01
PEKERJAAN INSTALASI MEP MASTERPLAN 8.70 4.35 0.72 0.72 0.72 0.72 0.72 0.72

6 PEKERJAAN PAGAR KAWASAN


PEKERJAAN PENDAHULUAN 0.17 0.17
PEKERJAAN STRUKTUR 2.27 0.32 0.32 0.32 0.32 0.32 0.32 0.32
PEKERJAAN ARSITEKTUR 3.84 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38

7 PEKERJAAN NORMALISASI SEMPADAN SUNGAI


PEKERJAAN PENDAHULUAN 0.33 0.33
PEKERJAAN NORMALISASI SEMPADAN SUNGAI 13.54 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97

8 PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP 1)


PEKERJAAN PENDAHULUAN 0.83 0.83
PEKERJAAN DASAR JALAN, PARKIR DAN SALURAN 4.88 0.81 0.81 0.81 0.81 0.81 0.81

BOBOT RENCANA 100.00 2.86 1.51 2.21 2.60 2.60 3.41 2.18 2.18 4.44 4.34 4.22 4.22 4.04 5.09 6.10 5.86 4.98 4.98 4.98 8.33 3.48 3.48 3.26 3.26 3.26 2.12

KOMULATIF PROGRES FISIK MINGGUAN 2.86 4.37 6.59 9.19 11.79 15.20 17.38 19.57 24.01 28.35 32.57 36.78 40.82 45.91 52.01 57.87 62.85 67.83 72.80 81.13 84.62 88.10 91.36 94.62 97.88 100.00

KETERANGAN : Tangerang Selatan, 01 Maret 2022


MINGGU KE-26 = 5 HARI KALENDER PT. MEGA BINTANG ABADI

SUMARDI
Direktur
JADWAL WAKTU PELAKSANAAN (TIME SCHEDULLE) BARCHART
PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
TAHUN ANGGARAN 2022
BOBOT WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO URAIAN PEKERJAAN KET
MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26
%
1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180

1 I. PEKERJAAN PENDAHULUAN 2.11 1.05 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 0.04 100%

2 PEKERJAAN GERBANG UTAMA ###


PEKERJAAN PENDAHULUAN 0.07 0.07
PEKERJAAN STRUKTUR 1.36 0.45 0.45 0.45

Pelaksanaan Selama 180 Hari Kalender


PEKERJAAN ARSITEKTUR 2.94 0.42 0.42 0.42 0.42 0.42 0.42 0.42

SERAH TERIMA PERTAMA (PHO)


PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 0.31 0.04 0.04 0.04 0.04 0.04 0.04 0.04

3 PEKERJAAN GEDUNG KANTOR UTAMA


PEKERJAAN PENDAHULUAN 2.58 2.58
PEKERJAAN STRUKTUR 10.03 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PEKERJAAN ARSITEKTUR 10.70 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 3.16 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24 0.24

4 PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN


PEKERJAAN PENDAHULUAN 1.48 1.48
PEKERJAAN STRUKTUR 13.56 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36 1.36
PEKERJAAN ARSITEKTUR 12.20 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02 1.02
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 2.62 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20

5 PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1)


PEKERJAAN PENDAHULUAN 0.14 0.14
PEKERJAAN STRUKTUR 1.34 0.22 0.22 0.22 0.22 0.22 0.22
PEKERJAAN ARSITEKTUR 0.78 0.13 0.13 0.13 0.13 0.13 0.13
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 0.07 0.01 0.01 0.01 0.01 0.01 0.01 0.01
PEKERJAAN INSTALASI MEP MASTERPLAN 8.70 4.35 0.72 0.72 0.72 0.72 0.72 0.72

6 PEKERJAAN PAGAR KAWASAN


PEKERJAAN PENDAHULUAN 0.17 0.17
PEKERJAAN STRUKTUR 2.27 0.32 0.32 0.32 0.32 0.32 0.32 0.32
PEKERJAAN ARSITEKTUR 3.84 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38 0.38

7 PEKERJAAN NORMALISASI SEMPADAN SUNGAI


PEKERJAAN PENDAHULUAN 0.33 0.33
PEKERJAAN NORMALISASI SEMPADAN SUNGAI 13.54 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97

8 PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP 1)


PEKERJAAN PENDAHULUAN 0.83 0.83
PEKERJAAN DASAR JALAN, PARKIR DAN SALURAN 4.88 0.81 0.81 0.81 0.81 0.81 0.81

BOBOT RENCANA 100.00 2.86 1.51 2.21 2.60 2.60 3.41 2.18 2.18 4.44 4.34 4.22 4.22 4.04 5.09 6.10 5.86 4.98 4.98 4.98 8.33 3.48 3.48 3.26 3.26 3.26 2.12

KOMULATIF PROGRES FISIK MINGGUAN 2.86 4.37 6.59 9.19 11.79 15.20 17.38 19.57 24.01 28.35 32.57 36.78 40.82 45.91 52.01 57.87 62.85 67.83 72.80 81.13 84.62 88.10 91.36 94.62 97.88 100.00

KETERANGAN : Tangerang Selatan, 01 Maret 2022


MINGGU KE-26 = 5 HARI KALENDER PT. MEGA BINTANG ABADI

SUMARDI
Direktur
JADWAL PENGIRIMAN TENAGA KERJA
PEKERJAAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
LOKASI : BERU-BERU, KALUKKU Kab. Mamuju Sulawesi Barat
WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO TENAGA KERJA MINGGU KE- MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26

HARI KE- 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180

1 MANAJER PROYEK

SERAH TERIMA PERTAMA (PHO)


2 MANAJER TEKNIK BANGUNAN GEDUNG

3 MANAJER TEKNIK ARSITEK

4 MANAJER KEUANGAN

5 AHLI K3 KONSTRUKSI

Tangerang Selatan, 01 Maret 2022


KETERANGAN : PT. MEGA BINTANG ABADI
MINGGU KE-26 = 5 HARI KALENDER

SUMARDI
Direktur
JADWAL PENGIRIMAN ALAT
PEKERJAAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
LOKASI : BERU-BERU, KALUKKU Kab. Mamuju Sulawesi Barat
WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO JENIS PERALATAN MINGGU KE- MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26

HARI KE- 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180

1 BATCHING PLANT

SERAH TERIMA PERTAMA (PHO)


2 CONCRETER PUMP

3 MOBIL MIXER

4 PILE DRIVE + HAMMER

5 EXCAVATOR PC-200

6 MOBILE CRANE

Tangerang Selatan, 01 Maret 2022


KETERANGAN : PT. MEGA BINTANG ABADI
MINGGU KE-26 = 5 HARI KALENDER

SUMARDI
Direktur
JADWAL PENGIRIMAN MATERIAL / BAHAN
PEKERJAAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
LOKASI : BERU-BERU, KALUKKU Kab. Mamuju Sulawesi Barat
WAKTU PELAKSANAAN 180 (SERATUS DELAPAN PULUH) HARI KALENDER
NO JENIS MATERIAL / BARANG MINGGU KE- MGG 1 MGG 2 MGG 3 MGG 4 MGG 5 MGG 6 MGG 7 MGG 8 MGG 9 MGG 10 MGG 11 MGG 12 MGG 13 MGG 14 MGG 15 MGG 16 MGG 17 MGG 18 MGG 19 MGG 20 MGG 21 MGG 22 MGG 23 MGG 24 MGG 25 MGG 26

HARI KE- 1-7 8-14 15-21 22-28 29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-180

1 BESI

2 KAYU CAMPUR

3 TRIPLEK

4 SEMEN

5 PASIR

6 BETON READY MIX

7 QUARY TIMBUNAN

SERAH TERIMA PERTAMA (PHO)


8 BATA RINGAN

9 TIANG PANCANG

10 L-SHAPE K350 (RAITINING WALL)

11 U-DICT

12 KUSEN, JENDELA DAN PINTU UPVC

13 PAGAR BRC

14 TRAFO

15 BAJA PROFIL DAN ATAP

16 ACP

17 INTALASI DAN ARMATUR LISTRIK

18 SANITARI

19 CAT

20 MEKANIKAL, ELEKTRIKAL DAN PLUMBING

Tangerang Selatan, 01 Maret 2022


KETERANGAN : PT. MEGA BINTANG ABADI
MINGGU KE-26 = 5 HARI KALENDER

SUMARDI
Direktur
NET WORK PLANNING DIAGRAM
NOTASI :
A = NAMA PEKERJAAN
A
X = MULAI PEKERJAAN
Y = SELESAI PEKERJAAN X Y
Z = JUMLAH WAKTU PEKERJAAN Z

A-II A-III A-IV A-V A-VI A-VII

15 91 43 172 64 179 106 179 1 105 8 112


77 130 116 74 105 105
A
I. PEKERJAAN PENDAHULUAN
II. PEKERJAAN GERBANG UTAMA
III. PEKERJAAN GEDUNG KANTOR UTAMA
IV. PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN
A-VIII
A-I
V. PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1 42
1) 0 179 42
VI. PEKERJAAN PAGAR KAWASAN 180
VII. PEKERJAAN NORMALISASI SEMPADAN SUNGAI
Tangerang Selatan, 01 Maret 2022
VIII. PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP
1) PT. MEGA BINTANG ABADI

SUMARDI
Direktur
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU
SULAWESI BARAT
PEKERJAAN : PEKERJAAN K3
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

PERUBAHAN TERHADAP KONTRAK ADDENDUM


KONTRAK AWAL
NO URAIAN PEKERJAAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b e f g h (e x g) i j k l m n o p q
1 BIAYA SMK 3
- Penyiapan RK3K
- Pembuatan manual Prosedur, Instruksi Kerja, Ijin Kerja dan Formulir 1.00 ls Rp. 450,000.00 Rp. 450,000.00 1.00 450,000.00 450,000.00 TETAP
- Pembuatan Kartu Identitas Pekerja (KIP) 235.00 Bh Rp. 5,000.00 Rp. 1,175,000.00 235.00 5,000.00 1,175,000.00 TETAP

- Sosialisasi dan Promosi K3


- Simulasi K3 235.00 Org Rp. 10,000.00 Rp. 2,350,000.00 235.00 10,000.00 2,350,000.00 TETAP
- Spanduk 30.00 Lbr Rp. 100,000.00 Rp. 3,000,000.00 30.00 100,000.00 3,000,000.00 TETAP
- Poster 43.00 Lbr Rp. 80,000.00 Rp. 3,440,000.00 43.00 80,000.00 3,440,000.00 TETAP
- Papan Informasi K3 5.00 Bh Rp. 800,000.00 Rp. 4,000,000.00 5.00 800,000.00 4,000,000.00 TETAP

- Alat Pelindung Kerja


- Pembatas Area 1.00 Ls Rp. 450,000.00 Rp. 450,000.00 1.00 450,000.00 450,000.00 TETAP

- Alat Pelindung Diri


- Helm Pelindung (Safety Helmet) 245.00 Bh Rp. 50,000.00 Rp. 12,250,000.00 245.00 50,000.00 12,250,000.00 TETAP
- Sarung Tangan (Safety Gloves) 230.00 Bh Rp. 40,000.00 Rp. 9,200,000.00 230.00 40,000.00 9,200,000.00 TETAP
- Sepatu Keselamatan ( Safety Shoes) 230.00 Bh Rp. 285,000.00 Rp. 65,550,000.00 230.00 285,000.00 65,550,000.00 TETAP
- Rompi Keselamatan (Safety Vest) 250.00 Bh Rp. 110,000.00 Rp. 27,500,000.00 250.00 110,000.00 27,500,000.00 TETAP
- masker 115.00 Dos Rp. 250,000.00 Rp. 28,750,000.00 115.00 250,000.00 28,750,000.00 TETAP

- Asuransi dan Perizinan


- BPJS Ketenagakerjaan dan Kesehatan Kerja 207.00 Org/6 Bln Rp. 90,000.00 Rp. 111,780,000.00 207.00 90,000.00 111,780,000.00 TETAP

- Peronil K3
- Petugas K3 8.00 Org/6bln Rp. 4,500,000.00 Rp. 216,000,000.00 8.00 4,500,000.00 216,000,000.00 TETAP

- Fasilitas Sarana Kesehatan


- Kotak P3K (beserta Obat-obatan dan Perban) 8.00 Bh Rp. 1,500,000.00 Rp. 12,000,000.00 8.00 1,500,000.00 12,000,000.00 TETAP
- Thermo Gun (Pengukur Suhu) 8.00 Bh Rp. 870,000.00 Rp. 6,960,000.00 8.00 870,000.00 6,960,000.00 TETAP

2 PAPAN NAMA PROYEK


- Papan Nama Proyek 1.00 bh Rp. 400,000.00 Rp. 400,000.00 1.00 400,000.00 400,000.00 TETAP

3 MOBILISASI DAN DEMOBILISASI


- Mobilisasi dan Demobilisasi 1.00 Ls Rp. 105,000,000.00 Rp. 105,000,000.00 1.00 105,000,000.00 105,000,000.00 TETAP

JUMLAH HARGA PEKERJAAN PENDAHULUAN Rp. 610,255,000.00 - - 610,255,000.00

7
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : #REF!
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I #REF! #REF!

JUMLAH #REF!

8
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN GERBANG UTAMA
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PENDAHULUAN Rp 19,175,240.00

II PEKERJAAN STRUKTUR Rp 395,378,721.64

III PEKERJAAN ARSITEKTUR Rp 851,511,096.77

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp 90,811,379.50

JUMLAH Rp 1,356,876,437.91

9
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN GERBANG UTAMA
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

PERUBAHAN TERHADAP KONTRAK ADDENDUM


KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 40.00 m' Rp. 479,381.00 19,175,240.00 40.00 479,381.00 19,175,240.00 TETAP

JUmLAH HARGA PEKERJAAN PENDAHULUAN Rp. 19,175,240.00 - - 19,175,240.00

II PEKERJAAN STRUKTUR
1 PONDASI TIANG PANCANG MINIPILE
- Minipile 25x25 8.00 bh
- Pengadaan dan Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01 88.00 m' Rp. 629,585.00 Rp. 55,403,480.00 88.00 629,585.00 55,403,480.00 TETAP
- Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01' 88.00 m' Rp. 385,385.00 Rp. 33,913,880.00 88.00 385,385.00 33,913,880.00
- Pekerjaan Joint/sambungan Tiang Pancang dan Welding AT. 02 8.00 titik Rp. 347,622.00 Rp. 2,780,976.00 8.00 347,622.00 2,780,976.00
- Tes PDA 1.00 titik Rp. 23,000,000.00 Rp. 23,000,000.00 1.00 23,000,000.00 23,000,000.00

2 POER
- Type P1 uk. 100x100X25 cm 8.00 bh
- Galian tanah Pondasi Poer A.2.3.1.2. 20.00 m3 Rp. 132,660.00 Rp. 2,653,200.00 20.00 132,660.00 2,653,200.00 TETAP
- Lantai kerja A.4.1.1.1 0.64 m2 Rp. 1,378,547.00 Rp. 882,270.08 0.64 1,378,547.00 882,270.08 TETAP
- Urugan kembali bekas galian A.2.3.1.9. 15.70 m3 Rp. 39,325.00 Rp. 617,559.80 15.70 39,325.00 617,559.80 TETAP
- Bekisting 2x pakai A.4.1.1.20 4.00 m2 Rp. 268,378.00 Rp. 1,073,512.00 4.00 268,378.00 1,073,512.00 TETAP
- Pembesian (Besi Ulir) 117.62 kg/m3 A.4.1.1.17 235.24 kg Rp. 19,868.20 Rp. 4,673,889.73 33.29 19,868.20 661,341.85 268.53 19,868.20 5,335,231.59 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.00 m3 Rp. 1,406,067.00 Rp. 2,812,134.00 2.00 1,406,067.00 2,812,134.00 TETAP

- Type P2 uk. 55x80X25 cm 7.00 bh


- Galian tanah Pondasi Poer A.2.3.1.2. 7.70 m3 Rp. 132,660.00 Rp. 1,021,482.00 7.70 132,660.00 1,021,482.00 TETAP
- Lantai kerja A.4.1.1.1 0.25 m2 Rp. 1,378,547.00 Rp. 339,673.98 0.25 1,378,547.00 339,673.98 TETAP
- Urugan kembali bekas galian A.2.3.1.9. 6.04 m3 Rp. 39,325.00 Rp. 237,507.27 6.04 39,325.00 237,507.27 TETAP
- Bekisting 2x pakai A.4.1.1.20 2.36 m2 Rp. 268,378.00 Rp. 634,043.03 2.36 268,378.00 634,043.03 TETAP
- Pembesian (Besi Ulir) 87.00 kg/m3 A.4.1.1.17 66.99 kg Rp. 19,868.20 Rp. 1,330,906.77 39.50 19,868.20 784,811.64 106.49 19,868.20 2,115,718.41 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.77 m3 Rp. 1,406,067.00 Rp. 1,082,671.59 0.77 1,406,067.00 1,082,671.59 TETAP

3 PEDESTAL KOLOM
- Kolom K1 uk. 30x30 8.00 bh
- Bekisting 2x pakai A.4.1.1.22 11.04 m2 Rp. 427,174.00 Rp. 4,716,000.96 11.04 427,174.00 4,716,000.96 TETAP
- Pembesian (Besi Polos) 115.74 kg/m3 A.4.1.1.17 191.66 kg Rp. 18,713.20 Rp. 3,586,599.34 191.66 18,713.20 3,586,599.34 TETAP
- Cor Beton K-275 A.4.1.1.9. 1.66 m3 Rp. 1,406,067.00 Rp. 2,328,446.95 1.66 1,406,067.00 2,328,446.95 TETAP

- Kolom K2 uk. 20x20 7.00 bh


- Bekisting 2x pakai A.4.1.1.22 6.44 m2 Rp. 427,174.00 Rp. 2,751,000.56 6.44 427,174.00 2,751,000.56 TETAP
- Pembesian (Besi Polos) 145.33 kg/m3 A.4.1.1.17 93.59 kg Rp. 18,713.20 Rp. 1,751,410.72 93.59 18,713.20 1,751,410.72 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.64 m3 Rp. 1,406,067.00 Rp. 905,507.15 0.64 1,406,067.00 905,507.15 TETAP

4 PONDASI BATU KALI


- Type PB1
- Galian tanah pondasi A.2.3.1.1. 16.78 m3 Rp. 108,075.00 Rp. 1,813,066.20 16.78 108,075.00 1,813,066.20 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 0.84 m3 Rp. 571,230.00 Rp. 479,147.72 0.84 571,230.00 479,147.72 TETAP
- Pas. Batu kosong A.3.2.1.9. 2.52 m3 Rp. 824,802.00 Rp. 2,075,531.75 2.52 824,802.00 2,075,531.75 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 7.46 m3 Rp. 1,016,070.00 Rp. 7,575,817.92 7.46 1,016,070.00 7,575,817.92 TETAP
- Urugan tanah bekas galian A.2.3.1.9. 5.96 m3 Rp. 39,325.00 Rp. 234,565.76 5.96 39,325.00 234,565.76 TETAP

- Type PB2 9.60 m'


- Galian tanah pondasi A.2.3.1.1. 5.28 m3 Rp. 108,075.00 Rp. 570,636.00 5.28 108,075.00 570,636.00 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 0.26 m3 Rp. 571,230.00 Rp. 150,804.72 0.26 571,230.00 150,804.72 TETAP
- Pas. Batu kosong A.3.2.1.9. 0.79 m3 Rp. 824,802.00 Rp. 653,243.18 0.79 824,802.00 653,243.18 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 2.69 m3 Rp. 1,016,070.00 Rp. 2,731,196.16 2.69 1,016,070.00 2,731,196.16 TETAP
- Urugan tanah bekas galian A.2.3.1.9. 1.54 m3 Rp. 39,325.00 Rp. 60,403.20 1.54 39,325.00 60,403.20 TETAP

5 SLOEF
- Type S1 uk 20/25 12.64 m'
- Bekisting 2x pakai A.4.1.1.21 3.16 m2 Rp. 284,878.00 Rp. 900,214.48 3.16 284,878.00 900,214.48 TETAP
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 88.02 kg Rp. 18,713.20 Rp. 1,647,224.90 136.23 18,713.20 2,549,300.03 224.25 18,713.20 4,196,524.92 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.63 m3 Rp. 1,406,067.00 Rp. 888,634.34 0.63 1,406,067.00 888,634.34 TETAP

- Type S2 uk 15/20 22.00 m'


- Bekisting 2x pakai A.4.1.1.21 4.40 m2 Rp. 284,878.00 Rp. 1,253,463.20 4.40 284,878.00 1,253,463.20 TETAP
- Pembesian (Besi Polos) 148.84 kg/m3 A.4.1.1.17 98.23 kg Rp. 18,713.20 Rp. 1,838,240.45 40.74 18,713.20 762,368.60 138.97 18,713.20 2,600,609.05 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.66 m3 Rp. 1,406,067.00 Rp. 928,004.22 0.66 1,406,067.00 928,004.22 TETAP

6 KOLOM LT.1
- Kolom K1 uk. 30x30 4.94 8.00 bh
- Bekisting 2x pakai A.4.1.1.22 16.80 m2 Rp. 427,174.00 Rp. 7,176,523.20 16.80 427,174.00 7,176,523.20 TETAP
- Pembesian (Besi Polos) 115.74 kg/m3 A.4.1.1.17 291.66 kg Rp. 18,713.20 Rp. 5,457,868.56 735.44 18,713.20 13,762,354.37 1,027.09 18,713.20 19,220,222.93 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.52 m3 Rp. 1,406,067.00 Rp. 3,543,288.84 2.52 1,406,067.00 3,543,288.84 TETAP

- Kolom KP uk. 20x20 4.94 1.00 bh


- Bekisting 2x pakai A.4.1.1.22 14.60 m2 Rp. 427,174.00 Rp. 6,236,740.40 14.60 427,174.00 6,236,740.40 TETAP
- Pembesian (Besi Polos) 145.33 kg/m3 A.4.1.1.17 212.18 kg Rp. 18,713.20 Rp. 3,970,589.53 114.31 18,713.20 2,139,153.31 326.49 18,713.20 6,109,742.84 BERTAMBAH
10
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- Cor Beton K-275 A.4.1.1.9. 1.46 m3 Rp. 1,406,067.00 Rp. 2,052,857.82 1.46 1,406,067.00 2,052,857.82 TETAP

- Kolom KP uk. 15x15 4.94 A.4.1.1.22 8.00 bh


- Bekisting 2x pakai A.4.1.1.17 8.40 m2 Rp. 427,174.00 Rp. 3,588,261.60 8.40 427,174.00 3,588,261.60 TETAP
- Pembesian (Besi Polos) 186.76 kg/m3 A.4.1.1.9. 117.66 kg Rp. 18,713.20 Rp. 2,201,753.79 82.92 18,713.20 1,551,760.28 200.58 18,713.20 3,753,514.07 BERTAMBAH
- Cor Beton K-275 0.63 m3 Rp. 1,406,067.00 Rp. 885,822.21 0.63 1,406,067.00 885,822.21 TETAP

7 BALOK
- Balok B1 uk. 20x25 12.64 m'
- Bekisting 2x pakai A.4.1.1.23 4.42 m2 Rp. 427,174.00 Rp. 1,889,817.78 4.42 427,174.00 1,889,817.78 TETAP
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 88.02 kg Rp. 18,713.20 Rp. 1,647,224.90 136.23 18,713.20 2,549,300.03 224.25 18,713.20 4,196,524.92 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.63 m3 Rp. 1,406,067.00 Rp. 888,634.34 0.63 1,406,067.00 888,634.34 TETAP

- Balok Anak B2 uk. 15x20 22.00 m'


- Bekisting 2x pakai A.4.1.1.23 6.05 m2 Rp. 427,174.00 Rp. 2,584,402.70 6.05 427,174.00 2,584,402.70 TETAP
- Pembesian (Besi Polos) 148.84 kg/m3 A.4.1.1.17 98.23 kg Rp. 18,713.20 Rp. 1,838,240.45 40.74 18,713.20 762,368.60 138.97 18,713.20 2,600,609.05 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.66 m3 Rp. 1,406,067.00 Rp. 928,004.22 0.66 1,406,067.00 928,004.22 TETAP

- Balok Dinding Taman B3 uk. 15x20 10.44 m'


- Bekisting 2x pakai A.4.1.1.23 2.87 m2 Rp. 427,174.00 Rp. 1,226,416.55 2.87 427,174.00 1,226,416.55 TETAP
- Pembesian (Besi Polos) 148.84 kg/m3 A.4.1.1.17 46.62 kg Rp. 18,713.20 Rp. 872,328.65 9.33 18,713.20 174,512.71 55.94 18,713.20 1,046,841.36 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.31 m3 Rp. 1,406,067.00 Rp. 440,380.18 0.31 1,406,067.00 440,380.18 TETAP

8 PLAT BETON
- Plat Beton 9.24 m2
- Bekisting Plat Lantai A.4.1.1.24 10.78 m2 Rp. 453,574.00 Rp. 4,887,713.42 10.78 453,574.00 4,887,713.42 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 170.13 kg Rp. 18,713.20 Rp. 3,183,756.66 55.69 18,713.20 1,042,095.59 225.82 18,713.20 4,225,852.25 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 1.11 m3 Rp. 1,406,067.00 Rp. 1,559,047.09 1.11 1,406,067.00 1,559,047.09 TETAP
- Waterproofing SikaTop Seal AT. 06 9.24 m2 Rp. 59,763.00 Rp. 552,210.12 9.24 59,763.00 552,210.12 TETAP

9 KOLOM LT.2
- Kolom K1 uk. 30x30 4.94 8.00 bh
- Bekisting 2x pakai A.4.1.1.22 19.20 m2 Rp. 427,174.00 Rp. 8,201,740.80 19.20 427,174.00 8,201,740.80 TETAP
- Pembesian (Besi Polos) 71.68 kg/m3 A.4.1.1.17 206.43 kg Rp. 18,713.20 Rp. 3,863,036.84 176.51 18,713.20 3,302,981.00 382.94 18,713.20 7,166,017.84 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.88 m3 Rp. 1,406,067.00 Rp. 4,049,472.96 2.88 1,406,067.00 4,049,472.96 TETAP

10 RING BALOK
- Ring Balok uk. 20x25 8.24 m'
- Bekisting 2x pakai A.4.1.1.23 2.88 m2 Rp. 427,174.00 Rp. 1,231,969.82 2.88 427,174.00 1,231,969.82 TETAP
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 57.38 kg Rp. 18,713.20 Rp. 1,073,823.83 1.44 18,713.20 26,982.47 55.94 18,713.20 1,046,841.36 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 0.41 m3 Rp. 1,406,067.00 Rp. 579,299.60 0.41 1,406,067.00 579,299.60 TETAP

- Balok Baja IWF 150.300 42.00 m'


- Pek. Besi Profil (IWF 300.150) A.4.2.1.1. 1,540.00 kg Rp. 38,604.00 Rp. 59,450,160.00 1,540.00 38,604.00 59,450,160.00 TETAP
- Pek. Plat Strip A.4.2.1.1. 23.00 kg Rp. 38,604.00 Rp. 887,892.00 23.00 38,604.00 887,892.00 TETAP
- Pek. Pengelasan A.4.2.1.5. 2,880.00 cm Rp. 3,229.60 Rp. 9,301,248.00 2,880.00 3,229.60 9,301,248.00 TETAP

11 PEK. SHELTER BUS


- Pek. Pondasi
- Galian tanah pondasi A.2.3.1.1. 4.00 m3 Rp. 108,075.00 Rp. 432,300.00 4.00 108,075.00 432,300.00 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 3.60 m3 Rp. 571,230.00 Rp. 2,056,428.00 3.60 571,230.00 2,056,428.00 TETAP
- Pas. Batu kosong A.3.2.1.9. 0.18 m3 Rp. 824,802.00 Rp. 148,464.36 0.18 824,802.00 148,464.36 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 0.54 m3 Rp. 1,016,070.00 Rp. 548,677.80 0.54 1,016,070.00 548,677.80 TETAP
- Urugan tanah bekas galian A.2.3.1.9. 1.60 m3 Rp. 39,325.00 Rp. 62,920.00 1.60 39,325.00 62,920.00 TETAP

- Type S2 uk 15/20 4.00 m'


- Bekisting 2x pakai A.4.1.1.21 0.80 m2 Rp. 284,878.00 Rp. 227,902.40 0.80 284,878.00 227,902.40 TETAP
- Pembesian (Besi Polos) 148.84 kg/m3 A.4.1.1.17 17.86 kg Rp. 18,713.20 Rp. 334,225.54 17.86 18,713.20 334,225.54 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.12 m3 Rp. 1,406,067.00 Rp. 168,728.04 0.12 1,406,067.00 168,728.04 TETAP

- Kolom KP uk. 20x20 4.94 4.00 bh


- Bekisting 2x pakai A.4.1.1.22 3.74 m2 Rp. 427,174.00 Rp. 1,599,339.46 3.74 427,174.00 1,599,339.46 TETAP
- Pembesian (Besi Polos) 145.33 kg/m3 A.4.1.1.17 54.41 kg Rp. 18,713.20 Rp. 1,018,211.45 54.41 18,713.20 1,018,211.45 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.37 m3 Rp. 1,406,067.00 Rp. 526,431.48 0.37 1,406,067.00 526,431.48 TETAP

- Balok Anak B2 uk. 15x20 4.60 m'


- Bekisting 2x pakai A.4.1.1.23 1.27 m2 Rp. 440,374.00 Rp. 557,073.11 1.27 440,374.00 557,073.11 TETAP
- Pembesian (Besi Polos) 148.84 kg/m3 A.4.1.1.17 20.54 kg Rp. 18,713.20 Rp. 384,359.37 20.54 18,713.20 384,359.37 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.14 m3 Rp. 1,406,067.00 Rp. 194,037.25 0.14 1,406,067.00 194,037.25 TETAP

- Plat Beton 7.64 m2


- Bekisting Plat Lantai A.4.1.1.24 9.00 m2 Rp. 453,574.00 Rp. 4,082,020.86 9.00 453,574.00 4,082,020.86 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 140.64 kg Rp. 18,713.20 Rp. 2,631,905.50 140.64 18,713.20 2,631,905.50 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.92 m3 Rp. 1,406,067.00 Rp. 1,288,812.26 0.92 1,406,067.00 1,288,812.26 TETAP

- Pek. Lantai dan Cover Shelter


- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 1.84 m3 Rp. 571,230.00 Rp. 1,051,063.20 1.84 571,230.00 1,051,063.20 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 1.29 m3 Rp. 1,378,547.00 Rp. 1,775,568.54 1.29 1,378,547.00 1,775,568.54 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 18.40 m2 Rp. 392,667.00 Rp. 7,225,072.80 18.40 392,667.00 7,225,072.80 TETAP

- Pek. ACP PVDF 4 mm Glossy Alloy 1100 + Rangka AT. 18 49.40 m2 Rp. 1,022,555.00 Rp. 50,518,307.22 49.40 1,022,555.00 50,518,307.22 TETAP

JUMLAH HARGA PEKERJAAN STRUKTUR Rp. 395,378,721.64 30,042,348.00 26,982.47 425,394,087.17

III PEKERJAAN ARSITEKTUR


1 PEKERJAAN DINDING
- Pekerjaan Dinding Pos Jaga

11
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- Pas. Dinding Bata Ringan T.10 Bata Ringan T:10 cm A.4.4.1.26 40.40 m2 Rp. 184,283.00 Rp. 7,444,664.63 40.40 184,283.00 7,444,664.63 TETAP
- Plesteran campuran 1 : 4 Camp. 1:4 T 15mm A.4.4.2.4. 95.99 m2 Rp. 89,139.00 Rp. 8,556,630.89 95.99 89,139.00 8,556,630.89 TETAP
- Plesteran campuran 1 : 2 (Trasram) Camp. 1:2 T 15mm A.4.4.2.2. 65.60 m2 Rp. 93,514.00 Rp. 6,134,518.40 65.60 93,514.00 6,134,518.40 TETAP
- Acian A.4.4.2.27. 73.42 m2 Rp. 50,985.00 Rp. 3,743,114.76 73.42 50,985.00 3,743,114.76 TETAP
- Pas. Granite Dinding Granito 25x60 A.4.4.3.54.a 7.38 m2 Rp. 553,512.00 Rp. 4,084,918.56 7.38 553,512.00 4,084,918.56 TETAP

- Pekerjaan Dinding Taman


- Pas. Dinding Bata Ringan T.10 Bata Ringan T:10 cm A.4.4.1.26 59.78 m2 Rp. 184,283.00 Rp. 11,016,437.74 59.78 184,283.00 11,016,437.74 TETAP
- Plesteran campuran 1 : 4 Camp. 1:4 T 15mm A.4.4.2.4. 119.56 m2 Rp. 89,139.00 Rp. 10,657,458.84 119.56 89,139.00 10,657,458.84 TETAP
- Acian A.4.4.2.27. 119.56 m2 Rp. 50,985.00 Rp. 6,095,766.60 119.56 50,985.00 6,095,766.60 TETAP

2 PEKERJAAN LANTAI
- Pekerjaan Lantai (Lt.01)
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 0.92 m3 Rp. 571,230.00 Rp. 527,816.52 0.92 571,230.00 527,816.52 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 0.65 m3 Rp. 1,378,547.00 Rp. 891,644.20 0.65 1,378,547.00 891,644.20 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 7.80 m2 Rp. 392,667.00 Rp. 3,062,802.60 7.80 392,667.00 3,062,802.60 TETAP
- Pekerjaan Granit tile 60x60 (Unpolish) Gelap A.4.4.3.10.b 1.44 m2 Rp. 398,778.00 Rp. 574,240.32 1.44 398,778.00 574,240.32 TETAP

3 PEKERJAAN PINTU, JENDELA DAN ACCSESORIES


- Pekerjaan Pintu
- Pintu Type (D1) 1.00 bh
Kusen UPVC UPVC Retto Putih AT. 07 6.74 m' Rp. 455,733.00 Rp. 3,071,640.42 6.74 455,733.00 3,071,640.42 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 6.50 m' Rp. 625,133.00 Rp. 4,063,364.50 6.50 625,133.00 4,063,364.50 TETAP
Kaca T.5mm A.4.6.2.17. 1.65 m2 Rp. 343,495.00 Rp. 566,766.75 1.65 343,495.00 566,766.75 TETAP
Sticker Sandblast AT. 12 1.65 m2 Rp. 81,873.00 Rp. 135,090.45 1.65 81,873.00 135,090.45 TETAP
Handle Pintu + Lockcase AT. 16 1.00 bh Rp. 800,844.00 Rp. 800,844.00 1.00 800,844.00 800,844.00 TETAP
Engsel Pintu A.4.6.2.5. 3.00 bh Rp. 70,970.00 Rp. 212,910.00 3.00 70,970.00 212,910.00 TETAP
Door Closer A.4.6.2.10. 1.00 bh Rp. 766,469.00 Rp. 766,469.00 1.00 766,469.00 766,469.00 TETAP

- Pintu Type (D2) 1.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 4.83 m' Rp. 455,733.00 Rp. 2,201,190.39 4.83 455,733.00 2,201,190.39 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 6.01 m' Rp. 625,133.00 Rp. 3,757,049.33 6.01 625,133.00 3,757,049.33 TETAP
Panil UPVC AT.10 0.90 m2 Rp. 584,433.00 Rp. 525,989.70 0.90 584,433.00 525,989.70 TETAP
Handle Pintu + Lockcase AT. 16 1.00 bh Rp. 800,844.00 Rp. 800,844.00 1.00 800,844.00 800,844.00 TETAP
Engsel Pintu A.4.6.2.5. 3.00 bh Rp. 70,970.00 Rp. 212,910.00 3.00 70,970.00 212,910.00 TETAP

- Pekerjaan Jendela
- Jendela Type (J1) 2.00 bh
Kusen UPVC UPVC Retto Putih AT. 07 30.80 m' Rp. 455,733.00 Rp. 14,036,576.40 30.80 455,733.00 14,036,576.40 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 10.20 m' Rp. 625,133.00 Rp. 6,376,356.60 10.20 625,133.00 6,376,356.60 TETAP
Kaca T.5mm A.4.6.2.17. 6.09 m2 Rp. 343,495.00 Rp. 2,091,060.16 6.09 343,495.00 2,091,060.16 TETAP
Engsel Jendela Casement Dekkson FS SS 20" A.4.6.2.7. 12.00 bh Rp. 277,849.00 Rp. 3,334,188.00 12.00 277,849.00 3,334,188.00 TETAP
Grendel Slot/Kunci Slot UPVC A.4.6.2.11. 6.00 bh Rp. 574,948.00 Rp. 3,449,688.00 6.00 574,948.00 3,449,688.00 TETAP

- Jendela Type (J2) 1.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 7.12 m' Rp. 455,733.00 Rp. 3,244,818.96 7.12 455,733.00 3,244,818.96 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 2.04 m' Rp. 625,133.00 Rp. 1,275,271.32 2.04 625,133.00 1,275,271.32 TETAP
Kaca T.5mm A.4.6.2.17. 2.83 m2 Rp. 343,495.00 Rp. 972,777.84 2.83 343,495.00 972,777.84 TETAP
Engsel Jendela Casement Dekkson FS SS 20" A.4.6.2.7. 2.00 bh Rp. 277,849.00 Rp. 555,698.00 2.00 277,849.00 555,698.00 TETAP
Grendel Slot/Kunci Slot UPVC A.4.6.2.11. 1.00 bh Rp. 574,948.00 Rp. 574,948.00 1.00 574,948.00 574,948.00 TETAP

- Ventilasi (V1) 1.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 2.48 m' Rp. 455,733.00 Rp. 1,130,217.84 2.48 455,733.00 1,130,217.84 TETAP
Kaca T.5mm A.4.6.2.17. 0.26 m2 Rp. 343,495.00 Rp. 89,033.90 0.26 343,495.00 89,033.90 TETAP

4 PEKERJAAN PLAFOND
- Pekerjaan Rangka Plafond
- Rangka Hollow A.4.2.1.21. 9.24 m2 Rp. 167,959.00 Rp. 1,551,941.16 9.24 167,959.00 1,551,941.16 TETAP

- Pekerjaan Penutup Plafond


- Pek. Plafond PVC A.4.5.1.10. 9.24 m2 Rp. 142,626.00 Rp. 1,317,864.24 9.24 142,626.00 1,317,864.24 TETAP
- Pek. List Plafond PVC A.4.5.1.10. 20.00 m' Rp. 42,262.00 Rp. 845,240.00 20.00 42,262.00 845,240.00 TETAP
- Pek. Kisi-Kisi Hollow AT. 73 43.31 m2 Rp. 336,399.00 Rp. 14,568,767.89 43.31 336,399.00 14,568,767.89 TETAP

5 PEKERJAAN PENGECATAN
- Pekerjaan Pengecatan
- Pek. Cat luar A.4.7.1.10. 40.40 m2 Rp. 57,629.00 Rp. 2,328,096.34 40.40 57,629.00 2,328,096.34 TETAP
- Pek. Cat dalam A.4.7.1.10.a 33.02 m2 Rp. 49,049.00 Rp. 1,619,499.88 33.02 49,049.00 1,619,499.88 TETAP
- Pek. Cat Besi Kisi-Kisi Hollow A.4.7.1.21. 21.65 m2 Rp. 174,460.00 Rp. 3,777,756.84 21.65 174,460.00 3,777,756.84 TETAP

6 PEKERJAAN LAIN-LAIN
- Pekerjaan ACP
- Pek.ACP PVDF 4 mm Glossy Alloy 1100 + Rangka 409.19 m2 Rp. 1,022,555.00 Rp. 418,416,212.79 409.19 1,022,555.00 418,416,212.79 TETAP
- Pek. Cutting ACP 10.50 m2 Rp. 500,000.00 Rp. 5,250,000.00 10.50 500,000.00 5,250,000.00 TETAP

- Pekerjaan Signed Text, Logo, dan LED Video Tron


- Pek. Letter Pembuatan Logo Harga Material 1.00 LS Rp. 5,500,000.00 Rp. 5,500,000.00 1.00 5,500,000.00 5,500,000.00 TETAP
Spesifikasi : Akrikil 3mm Putih
Finishing cutting sticker oracal 8500
From board 8 mm lapisan belakang
Lampu LED 3 mata
Power Suplay
Box Panel dan Timer

- Pek. Letter Pembuatan "BALAI LATIHAN KERJA" Harga Material 1.00 LS Rp. 6,000,000.00 Rp. 6,000,000.00 1.00 6,000,000.00 6,000,000.00 TETAP
- Pek. Letter Pembuatan "KEMENTERIAN KETENAGAKERJAAN" Harga Material 1.00 LS Rp. 10,200,000.00 Rp. 10,200,000.00 1.00 10,200,000.00 10,200,000.00 TETAP
- Pek. Letter Pembuatan "PROVINSI SULAWESI BARAT" Harga Material 1.00 LS Rp. 7,000,000.00 Rp. 7,000,000.00 1.00 7,000,000.00 7,000,000.00 TETAP

- Pek. Letter Pembuatan "JLN. POROS PALU-MAMUJU, BERU-BERU. Harga Material 1.00 LS Rp. 10,000,000.00 Rp. 10,000,000.00 1.00 10,000,000.00 10,000,000.00 TETAP
KALUKKU, KABUPATEN, MAMUJU, 90561"

12
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- LETTER STENLES + AKRILIK '' BALAI LATIHAN KERJA SULAWESI Harga Material 1.00 LS Rp. 35,000,000.00 Rp. 35,000,000.00 1.00 35,000,000.00 35,000,000.00 TETAP
BARAT ''
Spesifikasi : Stenless Body Miror
Akrilik 3mm lapisan letter
Lampu LED 3 mata
Box Panel + timer
Power Suplay
- Pek. Videotron Harga Material 6.00 Unit Rp. 25,000,000.00 Rp. 150,000,000.00 6.00 25,000,000.00 150,000,000.00 TETAP
Spesifikasi :
Product Model : P.8 Indoor Full Colour Ukuran 2 X 4 m
Pixel Pitch : 8 mm 96 X 2 = 192 cm
LED Type : SMD Epy Star 96 X 4 = 388 cm
Module Size : W:320 X H:160 mm Luas = ± 12 M²
Cabinet Type : Die Cast Alumunium
Cabinet Size : W:960 X H:960 mm
- Nova Studio (Software) Harga Material 1.00 LS Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- Receiving Card Novastar Harga Material 12.00 Unit Rp. 600,000.00 Rp. 7,200,000.00 12.00 600,000.00 7,200,000.00 TETAP
- Rangka V-tron (Fame Kontruksi V-tro) Harga Material 1.00 LS Rp. 12,000,000.00 Rp. 12,000,000.00 1.00 12,000,000.00 12,000,000.00 TETAP

Pek. Aksesoris
- Video Processor LVP Harga Material 1.00 Unit Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP
- Laptop Processor Core i7 Harga Material 1.00 Unit Rp. 10,000,000.00 Rp. 10,000,000.00 1.00 10,000,000.00 10,000,000.00 TETAP
- Power Distribution Panel Harga Material 1.00 Set Rp. 8,000,000.00 Rp. 8,000,000.00 1.00 8,000,000.00 8,000,000.00 TETAP
- Stabilizer Harga Material 1.00 Unit Rp. 3,400,000.00 Rp. 3,400,000.00 1.00 3,400,000.00 3,400,000.00 TETAP
- Cabel Data (Belden/M) + Connector Harga Material 50.00 m' Rp. 30,000.00 Rp. 1,500,000.00 50.00 30,000.00 1,500,000.00 TETAP

Pek. Lain-lain
- Setting + Comissioning + Testing + Training Harga Material 1.00 LS Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP

JUMLAH HARGA PEKERJAAN ARSITEKTUR Rp. 851,511,096.77 - - 851,511,096.77

IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pekerjaan Kabel-Kabel
- Dari KWH ke panel MDP NYY 4x50 mm2 AT. 26 10.00 m' Rp. 490,050.00 Rp. 4,900,500.00 10.00 490,050.00 4,900,500.00 TETAP
- Dari MDP ke PP-LP NYY 4x4 mm2 + NYA 1x4 mm2 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP

- Pekerjaan Panel
- MDP (Main Distribution Panel) Harga Material 1.00 unit Rp. 15,000,000.00 Rp. 15,000,000.00 1.00 15,000,000.00 15,000,000.00 TETAP

- Pek. Instalasi Penerangan & Stop Kontak


- Lampu RM TL led 2X9 Watt AT. 35 3.00 bh Rp. 581,166.67 Rp. 1,743,500.00 3.00 581,166.67 1,743,500.00 TETAP
- Lampu Downlight RD 150 LED 9 Watt AT. 31 6.00 bh Rp. 247,866.67 Rp. 1,487,200.00 6.00 247,866.67 1,487,200.00 TETAP
- Lampu Taman AT. 33 2.00 bh Rp. 1,358,866.67 Rp. 2,717,733.33 2.00 1,358,866.67 2,717,733.33 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 2.00 bh Rp. 60,995.00 Rp. 121,990.00 2.00 60,995.00 121,990.00 TETAP
- Saklar tunggal AT. 41 1.00 bh Rp. 48,130.50 Rp. 48,130.50 1.00 48,130.50 48,130.50 TETAP
- Saklar ganda AT. 43 2.00 bh Rp. 75,350.00 Rp. 150,700.00 2.00 75,350.00 150,700.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 6.00 ttk Rp. 268,950.00 Rp. 1,613,700.00 6.00 268,950.00 1,613,700.00 TETAP
- Instalasi titik lampu (NYM 3X2,5 mm2 dalam conduit) AT. 46 30.00 ttk Rp. 268,950.00 Rp. 8,068,500.00 30.00 268,950.00 8,068,500.00 TETAP

- Pekerjaan Ac Lantai 01
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa refrigran (1PK) 1.00 unit Rp. 7,932,408.00 Rp. 7,932,408.00 1.00 7,932,408.00 7,932,408.00 TETAP
- Stop kontak AC 16A, 1ph , 3 kaki 1.00 bh Rp. 79,860.00 Rp. 79,860.00 1.00 79,860.00 79,860.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) 1.00 titik Rp. 402,710.00 Rp. 402,710.00 1.00 402,710.00 402,710.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex 3.00 m' Rp. 15,000.00 Rp. 45,000.00 3.00 15,000.00 45,000.00 TETAP

2 PEKERJAAN PLUMBING
- Pekerjaan Air Bersih
- Tandon Air 1050 Liter Penguin AT. 71 1.00 bh Rp. 1,966,470.00 Rp. 1,966,470.00 1.00 1,966,470.00 1,966,470.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 1.00 m' Rp. 58,509.00 Rp. 58,509.00 1.00 58,509.00 58,509.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 3.00 m' Rp. 50,886.00 Rp. 152,658.00 3.00 50,886.00 152,658.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 6.00 m' Rp. 33,066.00 Rp. 198,396.00 6.00 33,066.00 198,396.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 1.00 bh Rp. 513,865.00 Rp. 513,865.00 1.00 513,865.00 513,865.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 1.00 bh Rp. 343,915.00 Rp. 343,915.00 1.00 343,915.00 343,915.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 1.00 bh Rp. 5,547,630.00 Rp. 5,547,630.00 1.00 5,547,630.00 5,547,630.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 1.00 bh Rp. 354,915.00 Rp. 354,915.00 1.00 354,915.00 354,915.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 1.00 bh Rp. 398,915.00 Rp. 398,915.00 1.00 398,915.00 398,915.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 1.00 bh Rp. 458,865.00 Rp. 458,865.00 1.00 458,865.00 458,865.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 1.00 bh Rp. 623,865.00 Rp. 623,865.00 1.00 623,865.00 623,865.00 TETAP

- Pekerjaan Air Bekas


- Pipa PVC AW dia 114 mm + Vent Inc. acessories A.5.1.1 32. a 21.00 m' Rp. 239,134.00 Rp. 5,021,814.00 21.00 239,134.00 5,021,814.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Pekerjaan Air Kotor


- Biotech 4 kubik aerob anaerob Lengkap acessories dan pendukungnya BioTech AT. 72 1.00 set Rp. 23,526,470.00 Rp. 23,526,470.00 1.00 23,526,470.00 23,526,470.00 TETAP
- Pipa PVC AW dia 114 mm + Vent. Inc. acessories A.5.1.1 32. a 6.00 m' Rp. 239,134.00 Rp. 1,434,804.00 6.00 239,134.00 1,434,804.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Test Commisioning
- Test Commisioning Harga Material 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP

JUMLAH HARGA PEKERJAAN MEP Rp. 90,811,379.50 - - 90,811,379.50

TOTAL JUMLAH HARGA PEKERJAAN GERBANG Rp. 1,356,876,437.91 30,042,348.00 26,982.47 1,386,891,803.44

13
REKAPITULASI BILL OF QUANTITY

KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT


PEKERJAAN : PEKERJAAN GEDUNG KANTOR UTAMA
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PENDAHULUAN Rp 748,585,640.00

II PEKERJAAN STRUKTUR Rp 2,905,010,752.01

III PEKERJAAN ARSITEKTUR Rp 3,100,567,464.58

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp 916,410,216.17

JUMLAH Rp 7,670,574,072.76

14
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN GEDUNG KANTOR UTAMA
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 40.00 m' Rp. 479,381.00 Rp. 19,175,240.00 40.00 479,381.00 19,175,240.00 TETAP
- Pekerjaan Pagar Proyek Harga Material 160.00 m' Rp. 85,500.00 Rp. 13,680,000.00 160.00 85,500.00 13,680,000.00 0.00 85,500.00 - BERKURANG

2 PEKERJAAN PEMATANGAN LAHAN


- Pekerjaan Penimbunan Tanah A.2.3.1.14. a 3,360.00 m3 Rp. 134,365.00 Rp. 451,466,400.00 3,360.00 134,365.00 451,466,400.00 TETAP
- Pekerjaan Pemadatan Tanah A.2.3.1.10. 3,360.00 m3 Rp. 78,650.00 Rp. 264,264,000.00 3,360.00 78,650.00 264,264,000.00 TETAP

JUmLAH HARGA PEKERJAAN PENDAHULUAN Rp. 748,585,640.00 - 13,680,000.00 734,905,640.00

II PEKERJAAN STRUKTUR
1 PONDASI TIANG PANCANG MINIPILE
- Minipile 25x25 40.00 bh
- Pengadaan dan Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01 440.00 m' Rp. 629,585.00 Rp. 277,017,400.00 440.00 629,585.00 277,017,400.00 TETAP
- Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01' 440.00 m' Rp. 385,385.00 Rp. 169,569,400.00 440.00 385,385.00 169,569,400.00 TETAP
- Pekerjaan Joint/sambungan Tiang Pancang dan Welding AT. 02 40.00 titik Rp. 347,622.00 Rp. 13,904,880.00 40.00 347,622.00 13,904,880.00 TETAP
- Tes PDA 2.00 titik Rp. 23,000,000.00 Rp. 46,000,000.00 2.00 23,000,000.00 46,000,000.00 TETAP

2 POER
- Type P1 uk. 160x160X30 cm 40.00 bh
- Galian tanah Pondasi Poer A.2.3.1.2. 291.84 m3 Rp. 132,660.00 Rp. 38,715,494.40 291.84 132,660.00 38,715,494.40 TETAP
- Lantai kerja A.4.1.1.1 10.24 m2 Rp. 1,378,547.00 Rp. 14,116,321.28 10.24 1,378,547.00 14,116,321.28 TETAP
- Urugan kembali bekas galian A.2.3.1.9. 235.20 m3 Rp. 39,325.00 Rp. 9,249,240.00 235.20 39,325.00 9,249,240.00 TETAP
- Bekisting 2x pakai A.4.1.1.20 38.40 m2 Rp. 268,378.00 Rp. 10,305,715.20 38.40 268,378.00 10,305,715.20 TETAP
- Pembesian (Besi Ulir) 228.47 kg/m3 A.4.1.1.17 7,018.57 kg Rp. 19,868.20 Rp. 139,446,323.82 1,464.01 19,868.20 29,087,214.83 5,554.56 19,868.20 110,359,108.99 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 30.72 m3 Rp. 1,406,067.00 Rp. 43,194,378.24 30.72 1,406,067.00 43,194,378.24 TETAP

3 PEDESTAL KOLOM
- Kolom K1 uk. 40x40 40.00 bh
- Bekisting 2x pakai A.4.1.1.22 78.40 m2 Rp. 427,174.00 Rp. 33,490,441.60 78.40 427,174.00 33,490,441.60 TETAP
- Pembesian (Besi Ulir) 78.91 kg/m3 A.4.1.1.17 1237.34 kg Rp. 19,868.20 Rp. 24,583,721.77 1256.36 19,868.20 24,961,529.10 2,493.70 19,868.20 49,545,250.87 BERTAMBAH
- Pembesian (Besi Polos) 42.64 kg/m3 A.4.1.1.17 668.61 kg Rp. 18,713.20 Rp. 12,511,922.48 668.61 18,713.20 12,511,922.48 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 15.68 m3 Rp. 1,406,067.00 Rp. 22,047,130.56 15.68 1,406,067.00 22,047,130.56 TETAP

4 PONDASI BATU KALI


- Type PB1 300.50 m'
- Galian tanah pondasi A.2.3.1.1. 360.60 m3 Rp. 108,075.00 Rp. 38,971,845.00 360.60 108,075.00 38,971,845.00 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 12.02 m3 Rp. 571,230.00 Rp. 6,866,184.60 12.02 571,230.00 6,866,184.60 TETAP
- Pas. Batu kosong A.3.2.1.9. 48.08 m3 Rp. 824,802.00 Rp. 39,656,480.16 48.08 824,802.00 39,656,480.16 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 132.22 m3 Rp. 1,016,070.00 Rp. 134,344,775.40 132.22 1,016,070.00 134,344,775.40 TETAP
- Urugan tanah bekas galian A.2.3.1.9. 168.28 m3 Rp. 39,325.00 Rp. 6,617,611.00 168.28 39,325.00 6,617,611.00 TETAP

- Type PB2 47.60 m'


- Galian tanah pondasi A.2.3.1.1. 26.66 m3 Rp. 108,075.00 Rp. 2,880,847.20 26.66 108,075.00 2,880,847.20 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 1.67 m3 Rp. 571,230.00 Rp. 951,669.18 1.67 571,230.00 951,669.18 TETAP
- Pas. Batu kosong A.3.2.1.9. 6.66 m3 Rp. 824,802.00 Rp. 5,496,480.53 6.66 824,802.00 5,496,480.53 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 12.14 m3 Rp. 1,016,070.00 Rp. 12,333,057.66 12.14 1,016,070.00 12,333,057.66 TETAP
- Urugan tanah bekas galian A.2.3.1.9. 10.00 m3 Rp. 39,325.00 Rp. 393,092.70 10.00 39,325.00 393,092.70 TETAP

5 SLOEF
- Type S1 uk 20/40 300.50 m'
- Bekisting 2x pakai A.4.1.1.21 120.20 m2 Rp. 284,878.00 Rp. 34,242,335.60 120.20 284,878.00 34,242,335.60 TETAP
- Pembesian (Besi Ulir) 78.14 kg/m3 A.4.1.1.17 1,878.52 kg Rp. 19,868.20 Rp. 37,322,784.34 1,947.67 19,868.20 38,696,779.45 3,826.19 19,868.20 76,019,563.79 BERTAMBAH
- Pembesian (Besi Polos) 48.55 kg/m3 A.4.1.1.17 1,167.13 kg Rp. 18,713.20 Rp. 21,840,680.51 1,167.13 18,713.20 21,840,680.51 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 24.04 m3 Rp. 1,406,067.00 Rp. 33,801,850.68 24.04 1,406,067.00 33,801,850.68 TETAP

- Type S1 uk 15/20 47.60 m'


- Bekisting 2x pakai A.4.1.1.21 9.52 m2 Rp. 284,878.00 Rp. 2,712,038.56 9.52 284,878.00 2,712,038.56 TETAP
- Pembesian (Besi Polos) 123.92 kg/m3 A.4.1.1.17 176.95 kg Rp. 18,713.20 Rp. 3,311,352.43 176.95 18,713.20 3,311,352.43 TETAP
- Cor Beton K-275 A.4.1.1.9. 1.43 m3 Rp. 1,406,067.00 Rp. 2,007,863.68 1.43 1,406,067.00 2,007,863.68 TETAP

6 PLAT LANTAI 1
- Plat Lantai 1
- Pembesian wiremesh 1 Lapis M-8 m2 500.79 78,628.00 39,376,116.12 500.79 78,628.00 39,376,116.12 BERTAMBAH
- Cor Beton K-275 t. 10 cm m3 1,406,067.00 50.079 1,406,067.00 70,414,429.29 50.08 1,406,067.00 70,414,429.29 BERTAMBAH
- Bekisting 2x pakai m2 284,878.00 109.2 284,878.00 31,108,677.60 109.20 284,878.00 31,108,677.60 BERTAMBAH

7 KOLOM LT.1
- Kolom K1 uk. 40x40 4.94 40.00 bh

15
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- Bekisting 2x pakai A.4.1.1.22 128.00 m2 Rp. 427,174.00 Rp. 54,678,272.00 128.00 427,174.00 54,678,272.00 TETAP
- Pembesian (Besi Ulir) 78.91 kg/m3 A.4.1.1.17 2,020.15 kg Rp. 19,868.20 Rp. 40,136,688.60 1,464.65 19,868.20 29,100,014.76 3,484.80 19,868.20 69,236,703.36 BERTAMBAH
- Pembesian (Besi Polos) 42.64 kg/m3 A.4.1.1.17 1,091.62 kg Rp. 18,713.20 Rp. 20,427,628.53 1,091.62 18,713.20 20,427,628.53 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 25.60 m3 Rp. 1,406,067.00 Rp. 35,995,315.20 25.60 1,406,067.00 35,995,315.20 TETAP

- Kolom KP uk. 15x15 4.94 48.00 bh


- Bekisting 2x pakai A.4.1.1.22 57.60 m2 Rp. 427,174.00 Rp. 24,605,222.40 57.60 427,174.00 24,605,222.40 TETAP
- Pembesian (Besi Polos) 186.76 kg/m3 A.4.1.1.17 806.80 kg Rp. 18,713.20 Rp. 15,097,740.30 806.80 18,713.20 15,097,740.30 TETAP
- Cor Beton K-275 A.4.1.1.9. 4.32 m3 Rp. 1,406,067.00 Rp. 6,074,209.44 4.32 1,406,067.00 6,074,209.44 TETAP

7 TANGGA
- Tangga Beton 1
- Anak Tangga 21.00 bh
Bekisting A.4.1.1.26 16.30 m2 Rp. 391,699.00 Rp. 6,384,443.01 16.30 391,699.00 6,384,443.01 TETAP
Pembesian (Besi Polos) 49.32 kg/m3 A.4.1.1.17 86.50 kg Rp. 18,713.20 Rp. 1,618,754.20 86.50 18,713.20 1,618,754.20 TETAP
Cor Beton K-275 A.4.1.1.9. 1.75 m3 Rp. 1,406,067.00 Rp. 2,466,129.03 1.75 1,406,067.00 2,466,129.03 TETAP

8 PLAT BORDES
- Plat Bordes T=25 3.90 m2
- Bekisting A.4.1.1.24 7.80 m2 Rp. 453,574.00 Rp. 3,537,877.20 7.80 453,574.00 3,537,877.20 TETAP
- Pembesian (Besi Polos) 39.46 kg/m3 A.4.1.1.17 76.94 kg Rp. 18,713.20 Rp. 1,439,778.64 - 76.94 18,713.20 1,439,778.64 TETAP
- Cor Beton K-275 A.4.1.1.9. 1.95 m3 Rp. 1,406,067.00 Rp. 2,741,830.65 1.95 1,406,067.00 2,741,830.65 TETAP

9 BALOK TANGGA
- Balok Beton uk. 20x40 4.50 m'
- Bekisting 2x pakai A.4.1.1.23 2.25 m2 Rp. 440,374.00 Rp. 990,841.50 2.25 440,374.00 990,841.50 TETAP
- Pembesian (Besi Ulir) 78.14 kg/m3 A.4.1.1.17 28.13 kg Rp. 19,868.20 Rp. 558,910.25 28.13 19,868.20 558,910.25 TETAP
- Pembesian (Besi Polos) 31.07 kg/m3 A.4.1.1.17 11.19 kg Rp. 18,713.20 Rp. 209,321.66 11.19 18,713.20 209,321.66 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.36 m3 Rp. 1,406,067.00 Rp. 506,184.12 0.36 1,406,067.00 506,184.12 TETAP

10 BALOK
- Balok B1 uk. 25x40 302.00 m'
- Bekisting 2x pakai A.4.1.1.23 158.55 m2 Rp. 440,374.00 Rp. 69,821,297.70 158.55 440,374.00 69,821,297.70 TETAP
- Pembesian (Besi Ulir) 110.48 kg/m3 A.4.1.1.17 3,336.40 kg Rp. 19,868.20 Rp. 66,288,249.76 1,924.43 19,868.20 38,234,906.61 5,260.83 19,868.20 104,523,156.38 BERTAMBAH
- Pembesian (Besi Polos) 54.25 kg/m3 A.4.1.1.17 1,638.41 kg Rp. 18,713.20 Rp. 30,659,901.50 1,638.41 18,713.20 30,659,901.50 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 30.20 m3 Rp. 1,406,067.00 Rp. 42,463,223.40 30.20 1,406,067.00 42,463,223.40 TETAP

- Balok Anak B2 uk. 20x30 100.00 m'


- Bekisting 2x pakai A.4.1.1.23 40.00 m2 Rp. 440,374.00 Rp. 17,614,960.00 40.00 440,374.00 17,614,960.00 TETAP
- Pembesian (Besi Ulir) 69.46 kg/m3 A.4.1.1.17 416.75 kg Rp. 19,868.20 Rp. 8,280,151.82 910.85 19,868.20 18,097,029.44 1,327.61 19,868.20 26,377,181.27 BERTAMBAH
- Pembesian (Besi Polos) 54.46 kg/m3 A.4.1.1.17 326.75 kg Rp. 18,713.20 Rp. 6,114,444.53 326.75 18,713.20 6,114,444.53 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 6.00 m3 Rp. 1,406,067.00 Rp. 8,436,402.00 6.00 1,406,067.00 8,436,402.00 TETAP

- Balok Anak B3 uk. 15x20 50.45 m'


- Bekisting 2x pakai A.4.1.1.23 13.87 m2 Rp. 440,374.00 Rp. 6,109,638.78 13.87 440,374.00 6,109,638.78 TETAP
- Pembesian (Besi Polos) 148.84 kg/m3 A.4.1.1.17 225.26 kg Rp. 18,713.20 Rp. 4,215,419.58 - 225.26 18,713.20 4,215,419.58 TETAP
- Cor Beton K-275 A.4.1.1.9. 1.51 m3 Rp. 1,406,067.00 Rp. 2,128,082.40 1.51 1,406,067.00 2,128,082.40 TETAP

11 PLAT LANTAI
- Plat Lantai 2 395.79 m2
- Steel floor decking 1 m2 Bondek 0.75 AT. 05 395.79 m2 Rp. 626,824.00 Rp. 248,090,670.96 395.79 626,824.00 248,090,670.96 TETAP
- Pembesian wiremesh 2 Lapis M-8 1 m2 A.4.1.1.19 395.79 m2 Rp. 78,628.00 Rp. 31,120,176.12 395.79 78,628.00 31,120,176.12 791.58 78,628.00 62,240,352.24 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 47.49 m3 Rp. 1,406,067.00 Rp. 66,780,870.95 47.49 1,406,067.00 66,780,870.95 TETAP

- Plat Lantai 2 30.00 m2


- Bekisting Plat Lantai A.4.1.1.24 30.00 m2 Rp. 453,574.00 Rp. 13,607,220.00 30.00 453,574.00 13,607,220.00 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 552.38 kg Rp. 18,713.20 Rp. 10,336,872.27 - 552.38 18,713.20 10,336,872.27 TETAP
- Cor Beton K-275 A.4.1.1.9. 3.60 m3 Rp. 1,406,067.00 Rp. 5,061,841.20 3.60 1,406,067.00 5,061,841.20 TETAP
- Waterproofing SikaTop Seal AT. 06 30.00 m2 Rp. 59,763.00 Rp. 1,792,890.00 30.00 59,763.00 1,792,890.00 BERTAMBAH
- Waterproofing Membrane Bakar Menbrane m2 Rp. Rp. - 30.00 375,000.00 11,250,000.00 30.00 375,000.00 11,250,000.00 TETAP

12 KOLOM LT.2
- Kolom K1 uk. 40x40 4.94 40.00 bh
- Bekisting 2x pakai A.4.1.1.22 128.00 m2 Rp. 427,174.00 Rp. 54,678,272.00 128.00 427,174.00 54,678,272.00 TETAP
- Pembesian (Besi Ulir) 78.91 kg/m3 A.4.1.1.17 2020.15 kg Rp. 19,868.20 Rp. 40,136,688.60 1720.40 19,868.20 34,181,187.70 3,740.54 19,868.20 74,317,876.30 BERTAMBAH
- Pembesian (Besi Polos) 42.64 kg/m3 A.4.1.1.17 1091.62 kg Rp. 18,713.20 Rp. 20,427,628.53 1,091.62 18,713.20 20,427,628.53 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 25.60 m3 Rp. 1,406,067.00 Rp. 35,995,315.20 25.60 1,406,067.00 35,995,315.20 TETAP

- Kolom KP uk. 15x15 4.94 53.00 bh


- Bekisting 2x pakai A.4.1.1.22 63.60 m2 Rp. 427,174.00 Rp. 27,168,266.40 63.60 427,174.00 27,168,266.40 TETAP
- Pembesian (Besi Polos) 186.76 kg/m3 A.4.1.1.17 890.84 kg Rp. 18,713.20 Rp. 16,670,421.58 890.84 18,713.20 16,670,421.58 TETAP
- Cor Beton K-275 A.4.1.1.9. 4.77 m3 Rp. 1,406,067.00 Rp. 6,706,939.59 4.77 1,406,067.00 6,706,939.59 TETAP

13 RING BALOK
- Balok uk. 20x40 282.00 m'
- Bekisting 2x pakai A.4.1.1.23 141.00 m2 Rp. 440,374.00 Rp. 62,092,734.00 141.00 440,374.00 62,092,734.00 TETAP
- Pembesian (Besi Polos) 87.08 kg/m3 A.4.1.1.17 1,964.54 kg Rp. 18,713.20 Rp. 36,762,809.34 1,964.54 18,713.20 36,762,809.34 TETAP
- Cor Beton K-275 A.4.1.1.9. 22.56 m3 Rp. 1,406,067.00 Rp. 31,720,871.52 22.56 1,406,067.00 31,720,871.52 TETAP

- Balok uk. 15x20 163.50 m'


- Bekisting 2x pakai A.4.1.1.23 44.96 m2 Rp. 440,374.00 Rp. 19,800,315.98 44.96 440,374.00 19,800,315.98 TETAP
- Pembesian (Besi Polos) 132.18 kg/m3 A.4.1.1.17 648.33 kg Rp. 18,713.20 Rp. 12,132,350.06 648.33 18,713.20 12,132,350.06 TETAP

16
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- Cor Beton K-275 A.4.1.1.9. 4.91 m3 Rp. 1,406,067.00 Rp. 6,896,758.64 4.91 1,406,067.00 6,896,758.64 TETAP

14 RANGKA ATAP
- Pasang Kuda-Kuda Baja Ringan Atap Pelana A.4.2.1.22. 384.78 m2 Rp. 360,050.00 Rp. 138,539,174.88 384.78 360,050.00 138,539,174.88 TETAP
- Pasang Kuda-Kuda Baja Ringan Atap Jurai A.4.2.1.23. 211.14 m2 Rp. 346,238.00 Rp. 73,103,998.84 211.14 346,238.00 73,103,998.84 TETAP

15 PENUTUP ATAP
- Pekerjaan Penutup Atap Pelana
- Pekerjaan Alumunium Foil A.4.5.2.43. 384.78 m2 Rp. 180,609.00 Rp. 69,494,297.56 384.78 180,609.00 69,494,297.56 TETAP
- Pekerjaan Atap Bitumen Gelombang AT. 03 384.78 m2 Rp. 192,951.00 Rp. 74,243,222.70 384.78 192,951.00 74,243,222.70 TETAP
- Pekerjaan Nok Atap Bitumen AT. 04 29.80 m' Rp. 135,349.00 Rp. 4,033,400.20 29.80 135,349.00 4,033,400.20

- Pekerjaan Penutup Atap Jurai


- Pekerjaan Alumunium Foil A.4.5.2.43. 211.14 m2 Rp. 180,609.00 Rp. 38,133,423.04 211.14 180,609.00 38,133,423.04 TETAP
- Pekerjaan Atap Bitumen Gelombang AT. 03 211.14 m2 Rp. 192,951.00 Rp. 40,739,288.24 211.14 192,951.00 40,739,288.24 TETAP
- Pekerjaan Nok Atap Bitumen AT. 04 9.16 m' Rp. 135,349.00 Rp. 1,239,796.84 9.16 135,349.00 1,239,796.84 TETAP

JUMLAH HARGA PEKERJAAN STRUKTUR Rp. 2,905,010,752.01 366,540,846.20 141,069,420.90 3,130,482,177.31

III PEKERJAAN ARSITEKTUR


1 PEKERJAAN DINDING
- Pekerjaan Dinding
- Pas. Dinding Bata Ringan Bata Ringan T:10 cm A.4.4.1.26 1,149.22 m2 Rp. 184,283.00 Rp. 211,781,248.55 1,149.22 184,283.00 211,781,248.55 TETAP
- Plesteran campuran 1 : 4 Camp. 1:4 T 15mm A.4.4.2.4. 2,000.44 m2 Rp. 89,139.00 Rp. 178,316,775.47 2,000.44 89,139.00 178,316,775.47 TETAP
- Plesteran campuran 1 : 2 (Trasram) Camp. 1:2 T 15mm A.4.4.2.2. 298.00 m2 Rp. 93,514.00 Rp. 27,867,172.00 298.00 93,514.00 27,867,172.00 TETAP
- Acian A.4.4.2.27. 2,149.44 m2 Rp. 50,985.00 Rp. 109,588,943.48 2,149.44 50,985.00 109,588,943.48 TETAP
- Pas. Granite Dinding Granito 25x60 A.4.4.3.56. 149.00 m2 Rp. 553,512.00 Rp. 82,473,288.00 149.00 553,512.00 82,473,288.00 TETAP

2 PEKERJAAN LANTAI
- Pekerjaan Lantai
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 117.27 m3 Rp. 571,230.00 Rp. 66,985,285.95 117.27 571,230.00 66,985,285.95 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 58.63 m3 Rp. 1,378,547.00 Rp. 80,827,656.98 58.63 1,378,547.00 80,827,656.98 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 754.95 m2 Rp. 392,667.00 Rp. 296,443,951.65 754.95 392,667.00 296,443,951.65 TETAP
- Pekerjaan Granit tile 60x60 (Unpolish) Gelap A.4.4.3.55. 417.70 m2 Rp. 398,778.00 Rp. 166,569,570.60 417.70 398,778.00 166,569,570.60 TETAP

3 PEKERJAAN PINTU, JENDELA DAN ACCSESORIES


- Pekerjaan Pintu
- Pintu Type (D1) 2.00 bh
Kusen UPVC UPVC Retto Putih AT. 07 41.68 m' Rp. 455,733.00 Rp. 18,994,951.44 41.68 455,733.00 18,994,951.44 TETAP
Kaca Tempered Glass 12 mm AT. 11 12.06 m2 Rp. 1,896,244.00 Rp. 22,876,287.62 12.06 1,896,244.00 22,876,287.62 TETAP
Kaca T.5mm A.4.6.2.17. 12.06 m2 Rp. 343,495.00 Rp. 4,143,923.68 12.06 343,495.00 4,143,923.68 TETAP
Sticker Sandblast AT. 12 21.53 m2 Rp. 81,873.00 Rp. 1,762,561.94 21.53 81,873.00 1,762,561.94 TETAP
Handle Pintu Stainless AT. 15 4.00 bh Rp. 1,339,844.00 Rp. 5,359,376.00 4.00 1,339,844.00 5,359,376.00 TETAP
Engsel Pintu Kaca Tempered AT. 13 4.00 bh Rp. 2,634,082.00 Rp. 10,536,328.00 4.00 2,634,082.00 10,536,328.00 TETAP
Kunci Kaca Tempered AT. 14 4.00 bh Rp. 1,112,188.00 Rp. 4,448,752.00 4.00 1,112,188.00 4,448,752.00 TETAP

- Pintu Type (D2) 8.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 42.94 m' Rp. 455,733.00 Rp. 19,570,997.95 42.94 455,733.00 19,570,997.95 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 62.51 m' Rp. 625,133.00 Rp. 39,078,314.10 62.51 625,133.00 39,078,314.10 TETAP
Panil UPVC AT. 10 20.38 m2 Rp. 584,433.00 Rp. 11,913,082.27 20.38 584,433.00 11,913,082.27 TETAP
Kaca T.5mm A.4.6.2.17. 5.40 m2 Rp. 343,495.00 Rp. 1,854,873.00 5.40 343,495.00 1,854,873.00 TETAP
Sticker Sandblast AT. 12 5.40 m2 Rp. 81,873.00 Rp. 442,114.20 5.40 81,873.00 442,114.20 TETAP
Handle Pintu + Lockcase AT. 16 8.00 bh Rp. 800,844.00 Rp. 6,406,752.00 8.00 800,844.00 6,406,752.00 TETAP
Engsel Pintu A.4.6.2.5. 48.00 bh Rp. 70,970.00 Rp. 3,406,560.00 48.00 70,970.00 3,406,560.00 TETAP
Kunci Tanam A.4.6.2.2. 8.00 bh Rp. 288,365.00 Rp. 2,306,920.00 8.00 288,365.00 2,306,920.00 TETAP
Door Closer A.4.6.2.10. 8.00 bh Rp. 766,469.00 Rp. 6,131,752.00 8.00 766,469.00 6,131,752.00 TETAP

- Pintu Type (D3) 13.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 69.94 m' Rp. 455,733.00 Rp. 31,873,966.02 69.94 455,733.00 31,873,966.02 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 92.30 m' Rp. 625,133.00 Rp. 57,699,775.90 92.30 625,133.00 57,699,775.90 TETAP
Panil UPVC AT. 10 25.74 m2 Rp. 584,433.00 Rp. 15,043,305.42 25.74 584,433.00 15,043,305.42 TETAP
Handle Pintu + Lockcase AT. 16 13.00 bh Rp. 800,844.00 Rp. 10,410,972.00 13.00 800,844.00 10,410,972.00 TETAP
Engsel Pintu A.4.6.2.5. 39.00 bh Rp. 70,970.00 Rp. 2,767,830.00 39.00 70,970.00 2,767,830.00 TETAP

- Pintu Type (D4) 15.00 bh Rp. 858,000.00 Rp. 12,870,000.00 15.00 858,000.00 12,870,000.00 TETAP
Kusen UPVC UPVC Retto Putih AT. 07 67.50 m' Rp. 455,733.00 Rp. 30,761,977.50 67.50 455,733.00 30,761,977.50 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 88.50 m' Rp. 625,133.00 Rp. 55,324,270.50 88.50 625,133.00 55,324,270.50 TETAP
Panil UPVC AT. 10 19.95 m2 Rp. 584,433.00 Rp. 11,659,438.35 19.95 584,433.00 11,659,438.35 TETAP
Handle Pintu + Lockcase AT. 16 15.00 bh Rp. 800,844.00 Rp. 12,012,660.00 15.00 800,844.00 12,012,660.00 TETAP
Engsel Pintu A.4.6.2.5. 45.00 bh Rp. 70,970.00 Rp. 3,193,650.00 45.00 70,970.00 3,193,650.00 TETAP

- Pekerjaan Jendela
- Jendela Type (J1) 2.00 bh
Kusen UPVC UPVC Retto Putih AT. 08 72.80 m' Rp. 455,733.00 Rp. 33,177,362.40 72.80 455,733.00 33,177,362.40 TETAP
Kaca T.5mm A.4.6.2.17. 22.40 m2 Rp. 343,495.00 Rp. 7,694,288.00 22.40 343,495.00 7,694,288.00 TETAP

- Jendela Type (J2) 8.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 296.80 m' Rp. 455,733.00 Rp. 135,261,554.40 296.80 455,733.00 135,261,554.40 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 09 136.32 m' Rp. 504,133.00 Rp. 68,723,410.56 136.32 504,133.00 68,723,410.56 TETAP
Kaca T.5mm A.4.6.2.17. 31.45 m2 Rp. 343,495.00 Rp. 10,802,780.35 31.45 343,495.00 10,802,780.35 TETAP
Engsel Jendela Casement Dekkson FS SS 14" A.4.6.2.7. 64.00 bh Rp. 277,849.00 Rp. 17,782,336.00 64.00 277,849.00 17,782,336.00 TETAP
Grendel Slot/Kunci Slot UPVC A.4.6.2.11. 32.00 bh Rp. 574,948.00 Rp. 18,398,336.00 32.00 574,948.00 18,398,336.00 TETAP

17
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- Jendela Type (J3) 4.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 88.80 m' Rp. 455,733.00 Rp. 40,469,090.40 88.80 455,733.00 40,469,090.40 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 09 92.80 m' Rp. 504,133.00 Rp. 46,783,542.40 92.80 504,133.00 46,783,542.40 TETAP
Kaca T.5mm A.4.6.2.17. 8.70 m2 Rp. 343,495.00 Rp. 2,989,780.48 8.70 343,495.00 2,989,780.48 TETAP
Engsel Jendela Casement Dekkson FS SS 14" A.4.6.2.7. 64.00 bh Rp. 277,849.00 Rp. 17,782,336.00 64.00 277,849.00 17,782,336.00 TETAP
Grendel Slot/Kunci Slot UPVC A.4.6.2.11. 32.00 bh Rp. 574,948.00 Rp. 18,398,336.00 32.00 574,948.00 18,398,336.00 TETAP

- Ventilasi (V1) 16.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 38.40 m' Rp. 455,733.00 Rp. 17,500,147.20 38.40 455,733.00 17,500,147.20 TETAP
Kaca T.5mm A.4.6.2.17. 3.36 m2 Rp. 343,495.00 Rp. 1,154,143.20 3.36 343,495.00 1,154,143.20 TETAP

4 PEKERJAAN PLAFOND
- Pekerjaan Rangka Plafond
- Rangka Hollow A.4.2.1.21. 140.00 m2 Rp. 167,959.00 Rp. 23,514,260.00 140.00 167,959.00 23,514,260.00 TETAP

- Pekerjaan Penutup Plafond


- Pek. Plafond Akustik + Rangka A.4.5.1.8. 751.25 m2 Rp. 433,004.00 Rp. 325,294,255.00 751.25 433,004.00 325,294,255.00 TETAP
- Pek. Plafond PVC A.4.5.1.10. 140.00 m2 Rp. 142,626.00 Rp. 19,967,640.00 140.00 142,626.00 19,967,640.00 TETAP
- Pek. List Plafond PVC A.4.5.1.10.a 71.00 m' Rp. 42,262.00 Rp. 3,000,602.00 71.00 42,262.00 3,000,602.00 TETAP

5 PEKERJAAN PENGECATAN
- Pekerjaan Pengecatan
- Pek. Cat A.4.7.1.10. 2,149.44 m2 Rp. 57,629.00 Rp. 123,869,789.62 2,149.44 57,629.00 123,869,789.62 TETAP

6 PEKERJAAN LAIN-LAIN
- Pekerjaan Railing besi
- Pekerjaan Railing untuk Tangga AT. 17 17.82 m' Rp. 1,004,740.00 Rp. 17,904,466.80 17.82 1,004,740.00 17,904,466.80 TETAP

- Pekerjaan ACP
- Pek. ACP PVDF 4 mm Glossy Alloy 1100 + Rangka AT. 18 504.42 m2 Rp. 1,022,555.00 Rp. 515,799,238.21 504.42 1,022,555.00 515,799,238.21 TETAP

- Pekerjaan Signed Text dan Logo


- Pekerjaan Signed Text AT. 19 557.00 cm Rp. 13,849.00 Rp. 7,713,893.00 557.00 13,849.00 7,713,893.00 TETAP
- Pekerjaan Signed Logo AT. 19 208.00 cm Rp. 13,849.00 Rp. 2,880,592.00 208.00 13,849.00 2,880,592.00 TETAP

JUMLAH HARGA PEKERJAAN ARSITEKTUR Rp. 3,100,567,464.58 - - 3,100,567,464.58

IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pekerjaan Kabel-Kabel
- Dari KWH ke panel MDP NYY 4x50 mm2 AT. 26 10.00 m' Rp. 490,050.00 Rp. 4,900,500.00 10.00 490,050.00 4,900,500.00 TETAP
- Dari MDP ke PP-LP NYY 4x4 mm2 + NYA 1x4 mm2 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari MDP ke PP-SK & AC NYY 4x25 mm2 + NYA 1x16 mm3 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP
- Dari MDP ke SDP-Lt.2 NYY 4x35 mm2 + NYA 1x16 mm4 AT. 24 10.00 m' Rp. 464,933.33 Rp. 4,649,333.33 10.00 464,933.33 4,649,333.33 TETAP
- Dari SDP-Lt.2 ke PP-LP Lt.2 NYY 4x4 mm2 + NYA 1x4 mm5 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari SDP-Lt.2 ke PP-SK & AC Lt.2 NYY 4x25 mm2 + NYA 1x16 mm6 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP

- Peketrjaan Panel
- MDP (Main Distribution Panel) Harga Material 1.00 unit Rp. 15,000,000.00 Rp. 15,000,000.00 1.00 15,000,000.00 15,000,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.1 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- SDP (Sub Distribution Panel) Lt. 2 Harga Material 1.00 unit Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.2 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Lt.2 Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- Pentanahan Elektrikal MAX 2 OHM Harga Material 1.00 titik Rp. 7,000,000.00 Rp. 7,000,000.00 1.00 7,000,000.00 7,000,000.00 TETAP

- Pek. Instalasi Penerangan & Stop Kontak Lantai 01


- Lampu RM TL led 2X9 Watt AT. 35 36.00 bh Rp. 581,166.67 Rp. 20,922,000.00 36.00 581,166.67 20,922,000.00 TETAP
- Lampu Downlight RD 150 LED 9 Watt AT. 31 46.00 bh Rp. 247,866.67 Rp. 11,401,866.67 46.00 247,866.67 11,401,866.67 TETAP
- Lampu exit LED c/w nicad battery AT. 33 2.00 bh Rp. 1,358,866.67 Rp. 2,717,733.33 2.00 1,358,866.67 2,717,733.33 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 35.00 bh Rp. 60,995.00 Rp. 2,134,825.00 35.00 60,995.00 2,134,825.00 TETAP
- Saklar tunggal AT. 41 8.00 bh Rp. 48,130.50 Rp. 385,044.00 8.00 48,130.50 385,044.00 TETAP
- Saklar ganda AT. 43 15.00 bh Rp. 75,350.00 Rp. 1,130,250.00 15.00 75,350.00 1,130,250.00 TETAP
- Saklar hotel AT. 42 1.00 bh Rp. 80,905.00 Rp. 80,905.00 1.00 80,905.00 80,905.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 35.00 ttk Rp. 268,950.00 Rp. 9,413,250.00 35.00 268,950.00 9,413,250.00 TETAP
- Instalasi titik lampu (NYM 3X2,5 mm2 dalam conduit) AT. 46 84.00 ttk Rp. 268,950.00 Rp. 22,591,800.00 84.00 268,950.00 22,591,800.00 TETAP
- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort dan accessories lainnya AT. 30 20.00 m' Rp. 273,900.00 Rp. 5,478,000.00 20.00 273,900.00 5,478,000.00 TETAP

- Pek. Instalasi Penerangan & Stop Kontak Lantai 02


- Lampu RM TL led 2X9 Watt AT. 35 48.00 bh Rp. 581,166.67 Rp. 27,896,000.00 48.00 581,166.67 27,896,000.00 TETAP
- Lampu Downlight RD 150 LED 9 Watt AT. 31 35.00 bh Rp. 247,866.67 Rp. 8,675,333.33 35.00 247,866.67 8,675,333.33 TETAP
- Lampu exit LED c/w nicad battery AT. 33 1.00 bh Rp. 1,358,866.67 Rp. 1,358,866.67 1.00 1,358,866.67 1,358,866.67 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 30.00 bh Rp. 60,995.00 Rp. 1,829,850.00 30.00 60,995.00 1,829,850.00 TETAP
- Saklar tunggal AT. 41 7.00 bh Rp. 48,130.50 Rp. 336,913.50 7.00 48,130.50 336,913.50 TETAP
- Saklar ganda AT. 43 16.00 bh Rp. 75,350.00 Rp. 1,205,600.00 16.00 75,350.00 1,205,600.00 TETAP
- Saklar hotel AT. 42 1.00 bh Rp. 80,905.00 Rp. 80,905.00 1.00 80,905.00 80,905.00 TETAP
- Instalasi stop kontak(NYM 3X2,5 mm2 dalam conduit) AT. 46 30.00 bh Rp. 268,950.00 Rp. 8,068,500.00 30.00 268,950.00 8,068,500.00 TETAP
- Instalasi titik lampu (NYM 3X2,5 mm2 dalam conduit) AT. 46 84.00 ttk Rp. 268,950.00 Rp. 22,591,800.00 84.00 268,950.00 22,591,800.00 TETAP
- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort dan accessories lainnya AT. 30 20.00 m' Rp. 273,900.00 Rp. 5,478,000.00 20.00 273,900.00 5,478,000.00 TETAP

- Pekerjaan Penangkal Petir Dan Pentanahan

18
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- Air Terminal, Radius Proteksi Minimal 120 Meter AT. 49 1.00 unit Rp. 6,210,402.00 Rp. 6,210,402.00 1.00 6,210,402.00 6,210,402.00 TETAP
- Obstruction Light led 5 W AT. 51 1.00 bh Rp. 5,988,400.00 Rp. 5,988,400.00 1.00 5,988,400.00 5,988,400.00 TETAP
- Conductor Cable NYY 1x70 mm2 dalam pipa conduit AT. 50 60.00 m' Rp. 141,900.00 Rp. 8,514,000.00 60.00 141,900.00 8,514,000.00 TETAP
- Cable Clamp, Support & accesories dan material bantu lain 1.00 ls Rp. 851,400.00 Rp. 851,400.00 1.00 851,400.00 851,400.00 TETAP
- Grounding max 2 ohm/electroda pentanahan AT. 52 1.00 titik Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Tiang Harga Material 1.00 ls Rp. 1,300,000.00 Rp. 1,300,000.00 1.00 1,300,000.00 1,300,000.00 TETAP

- Pekerjaan Pentanahan
- Pentanahan Listrik Arus Kuat AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Pentanahan Listrik Arus Lemah AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP

- Pekerjaan Fire Alarm Lantai 01


- MCFA 5 Zone c/w battery & charge Harga Material 1.00 unit Rp. 25,000,000.00 Rp. 25,000,000.00 1.00 25,000,000.00 25,000,000.00 TETAP
- ROR Heat Detector AT. 55 12.00 bh Rp. 240,196.00 Rp. 2,882,352.00 12.00 240,196.00 2,882,352.00 TETAP
- Smoke Detector AT. 54 28.00 bh Rp. 494,186.00 Rp. 13,837,208.00 28.00 494,186.00 13,837,208.00 TETAP
- Alarm Bell AT. 57 2.00 bh Rp. 241,780.00 Rp. 483,560.00 2.00 241,780.00 483,560.00 TETAP
- Manual Push Button AT. 56 2.00 bh Rp. 149,380.00 Rp. 298,760.00 2.00 149,380.00 298,760.00 TETAP
- Indicator Lamp AT. 58 2.00 bh Rp. 218,680.00 Rp. 437,360.00 2.00 218,680.00 437,360.00 TETAP
- Pengkabelan dari MDF-FA ke TB-FA NYA 3x2.5 mm2 dalam pipa conduit AT. 61 8.00 m' Rp. 268,950.00 Rp. 2,151,600.00 8.00 268,950.00 2,151,600.00 TETAP
- Instalasi Fire Alarm kabel NYA 2x1.5 mm2 dalam pipa conduit AT. 60 46.00 ttk Rp. 233,750.00 Rp. 10,752,500.00 46.00 233,750.00 10,752,500.00 TETAP
- Portable Fire extinguisher dry chemical class abc 3 kg Harga Material 8.00 bh Rp. 800,000.00 Rp. 6,400,000.00 8.00 800,000.00 6,400,000.00 TETAP

- Pekerjaan Fire Alarm Lantai 02


- Terminal Box ( TB - FA ) Harga Material 1.00 unit Rp. 1,500,000.00 Rp. 1,500,000.00 1.00 1,500,000.00 1,500,000.00 TETAP
- ROR Heat Detector AT. 55 12.00 bh Rp. 240,196.00 Rp. 2,882,352.00 12.00 240,196.00 2,882,352.00 TETAP
- Smoke Detector AT. 54 28.00 bh Rp. 494,186.00 Rp. 13,837,208.00 28.00 494,186.00 13,837,208.00 TETAP
- Alarm Bell AT. 57 2.00 bh Rp. 241,780.00 Rp. 483,560.00 2.00 241,780.00 483,560.00 TETAP
- Manual Push Button AT. 56 2.00 bh Rp. 149,380.00 Rp. 298,760.00 2.00 149,380.00 298,760.00 TETAP
- Indicator Lamp AT. 58 2.00 bh Rp. 218,680.00 Rp. 437,360.00 2.00 218,680.00 437,360.00 TETAP
- Instalasi Fire Alarm kabel NYMA 2x1.5 mm2 dalam pipa conduit AT. 60 46.00 ttk Rp. 233,750.00 Rp. 10,752,500.00 46.00 233,750.00 10,752,500.00 TETAP
- Portable Fire extinguisher dry chemical class abc 3 kg Harga Material 8.00 bh Rp. 800,000.00 Rp. 6,400,000.00 8.00 800,000.00 6,400,000.00 TETAP

- Pekerjaan Ac Lantai 01
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa refrigran (2PK) AT. 64 12.00 unit Rp. 10,288,608.00 Rp. 123,463,296.00 12.00 10,288,608.00 123,463,296.00 TETAP
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 12.00 bh Rp. 79,860.00 Rp. 958,320.00 12.00 79,860.00 958,320.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 12.00 titik Rp. 402,710.00 Rp. 4,832,520.00 12.00 402,710.00 4,832,520.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 120.00 m' Rp. 15,000.00 Rp. 1,800,000.00 120.00 15,000.00 1,800,000.00 TETAP

- Pekerjaan Ac Lantai 02
- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa refrigran (2 PK) AT. 64 7.00 unit Rp. 10,288,608.00 Rp. 72,020,256.00 7.00 10,288,608.00 72,020,256.00 TETAP
- AC Split System - Wall mounted type, 9.000 BTU/h Termasuk Pipa refrigran (1 PK) AT. 62 2.00 unit Rp. 7,932,408.00 Rp. 15,864,816.00 2.00 7,932,408.00 15,864,816.00 TETAP
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 6.00 bh Rp. 79,860.00 Rp. 479,160.00 6.00 79,860.00 479,160.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 6.00 titik Rp. 402,710.00 Rp. 2,416,260.00 6.00 402,710.00 2,416,260.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 120.00 m' Rp. 15,000.00 Rp. 1,800,000.00 120.00 15,000.00 1,800,000.00 TETAP

2 PEKERJAAN PLUMBING
- Pekerjaan Air Bersih Lantai 1
- Roof Tank Kapasitas 4 m3 FRP AT. 70 1.00 bh Rp. 14,286,470.00 Rp. 14,286,470.00 1.00 14,286,470.00 14,286,470.00 TETAP
- Pipa PVC AW dia 40 mm A.5.1.1 28. a 20.00 m' Rp. 85,239.00 Rp. 1,704,780.00 20.00 85,239.00 1,704,780.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 45.00 m' Rp. 58,509.00 Rp. 2,632,905.00 45.00 58,509.00 2,632,905.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 31.00 m' Rp. 50,886.00 Rp. 1,577,466.00 31.00 50,886.00 1,577,466.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 73.00 m' Rp. 33,066.00 Rp. 2,413,818.00 73.00 33,066.00 2,413,818.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 2.00 bh Rp. 513,865.00 Rp. 1,027,730.00 2.00 513,865.00 1,027,730.00 TETAP
- Wastafel LW 643 J Inc. Acessories A.5.1.1 5. 5.00 bh Rp. 4,128,231.00 Rp. 20,641,155.00 5.00 4,128,231.00 20,641,155.00 TETAP
- Kran Wastafel TX109LD A.5.1.1 19. a 5.00 bh Rp. 1,168,915.00 Rp. 5,844,575.00 5.00 1,168,915.00 5,844,575.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 5.00 bh Rp. 343,915.00 Rp. 1,719,575.00 5.00 343,915.00 1,719,575.00 TETAP
- Urinoir U57M inc. acessories A.5.1.1 4. 5.00 bh Rp. 7,194,132.00 Rp. 35,970,660.00 5.00 7,194,132.00 35,970,660.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 6.00 bh Rp. 5,547,630.00 Rp. 33,285,780.00 6.00 5,547,630.00 33,285,780.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 6.00 bh Rp. 354,915.00 Rp. 2,129,490.00 6.00 354,915.00 2,129,490.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 6.00 bh Rp. 398,915.00 Rp. 2,393,490.00 6.00 398,915.00 2,393,490.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 6.00 bh Rp. 458,865.00 Rp. 2,753,190.00 6.00 458,865.00 2,753,190.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 6.00 bh Rp. 623,865.00 Rp. 3,743,190.00 6.00 623,865.00 3,743,190.00 TETAP
- Cermin Wastafel A.5.1.1 14.b 5.00 bh Rp. 2,768,865.00 Rp. 13,844,325.00 5.00 2,768,865.00 13,844,325.00 TETAP

- Pekerjaan Air Bersih Lantai 2


- Roof Tank Kapasitas 4 m3 FRP AT. 70 1.00 bh Rp. 14,286,470.00 Rp. 14,286,470.00 1.00 14,286,470.00 14,286,470.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 53.00 m' Rp. 58,509.00 Rp. 3,100,977.00 53.00 58,509.00 3,100,977.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 42.00 m' Rp. 50,886.00 Rp. 2,137,212.00 42.00 50,886.00 2,137,212.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 74.00 m' Rp. 33,066.00 Rp. 2,446,884.00 74.00 33,066.00 2,446,884.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 2.00 bh Rp. 513,865.00 Rp. 1,027,730.00 2.00 513,865.00 1,027,730.00 TETAP
- Wastafel LW 643 J Inc. Acessories A.5.1.1 5. 4.00 bh Rp. 4,128,231.00 Rp. 16,512,924.00 4.00 4,128,231.00 16,512,924.00 TETAP
- Kran Wastafel TX109LD A.5.1.1 19. a 4.00 bh Rp. 1,168,915.00 Rp. 4,675,660.00 4.00 1,168,915.00 4,675,660.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 6.00 bh Rp. 343,915.00 Rp. 2,063,490.00 6.00 343,915.00 2,063,490.00 TETAP
- Urinoir U57M inc. acessories A.5.1.1 4. 2.00 bh Rp. 7,194,132.00 Rp. 14,388,264.00 2.00 7,194,132.00 14,388,264.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 6.00 bh Rp. 5,547,630.00 Rp. 33,285,780.00 6.00 5,547,630.00 33,285,780.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 6.00 bh Rp. 354,915.00 Rp. 2,129,490.00 6.00 354,915.00 2,129,490.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 6.00 bh Rp. 398,915.00 Rp. 2,393,490.00 6.00 398,915.00 2,393,490.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 6.00 bh Rp. 458,865.00 Rp. 2,753,190.00 6.00 458,865.00 2,753,190.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 6.00 bh Rp. 623,865.00 Rp. 3,743,190.00 6.00 623,865.00 3,743,190.00 TETAP
- Cermin Wastafel A.5.1.1 14.b 3.00 bh Rp. 2,768,865.00 Rp. 8,306,595.00 3.00 2,768,865.00 8,306,595.00 TETAP

- Pekerjaan Air Bekas Lantai 1

19
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
NO URAIAN PEKERJAAN MEREK / UKURAN PEK. TAMBAH PEK. KURANG CCO - 1
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

- Pipa PVC AW dia 114 mm + Vent Inc. acessories A.5.1.1 32. a 66.00 m' Rp. 239,134.00 Rp. 15,782,844.00 66.00 239,134.00 15,782,844.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Pekerjaan Air Bekas Lantai 2


- Pipa PVC AW dia 114 mm + Vent Inc. acessories A.5.1.1 32. a 42.00 m' Rp. 239,134.00 Rp. 10,043,628.00 42.00 239,134.00 10,043,628.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Pekerjaan Air Kotor Lantai 1


- Biotech 4 kubik aerob anaerob Lengkap acessories dan pendukungnya AT. 72 1.00 set Rp. 23,526,470.00 Rp. 23,526,470.00 1.00 23,526,470.00 23,526,470.00 TETAP
- Pipa PVC AW dia 114 mm + Vent. Inc. acessories A.5.1.1 32. a 73.00 m' Rp. 239,134.00 Rp. 17,456,782.00 73.00 239,134.00 17,456,782.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Pekerjaan Air Kotor Lantai 2


- Pipa PVC AW dia 114 mm + Vent. Inc. acessories A.5.1.1 32. a 47.00 m' Rp. 239,134.00 Rp. 11,239,298.00 47.00 239,134.00 11,239,298.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Test Commisioning
- Test Commisioning Harga Material 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP

JUMLAH HARGA PEKERJAAN MEP Rp. 916,410,216.17 - - 916,410,216.17

TOTAL JUMLAH HARGA PEKERJAAN GEDUNG UTAMA Rp. 7,670,574,072.76 366,540,846.20 154,749,420.90 7,882,365,498.05

20
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PENDAHULUAN Rp 429,289,860.00

II PEKERJAAN STRUKTUR Rp 3,928,978,086.14

III PEKERJAAN ARSITEKTUR Rp 3,535,830,526.15

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp 758,062,388.45

JUMLAH Rp 8,652,160,860.74
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

PERUBAHAN TERHADAP KONTRAK ADDENDUM


KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f g h (e x g) i j k l m n o p q

I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 60.00 m' Rp. 479,381.00 Rp. 28,762,860.00 60.00 479,381.00 28,762,860.00 TETAP
- Pekerjaan Pagar Proyek Harga Material 200.00 m' Rp. 85,500.00 Rp. 17,100,000.00 200.00 85,500.00 17,100,000.00 0.00 85,500.00 - BERKURANG

2 PEKERJAAN PEMATANGAN LAHAN


- Pekerjaan Penimbunan Tanah A.2.3.1.14. a 1,800.00 m3 Rp. 134,365.00 Rp. 241,857,000.00 1,800.00 134,365.00 241,857,000.00 TETAP
- Pekerjaan Pemadatan Tanah A.2.3.1.10. 1,800.00 m3 Rp. 78,650.00 Rp. 141,570,000.00 1,800.00 78,650.00 141,570,000.00 TETAP

JUmLAH HARGA PEKERJAAN PENDAHULUAN Rp. 429,289,860.00 - 17,100,000.00 412,189,860.00

II PEKERJAAN STRUKTUR
1 PONDASI TIANG PANCANG MINIPILE
- Minipile 25x25 27.00 bh
- Pengadaan dan Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01 297.00 m' Rp. 629,585.00 Rp. 186,986,745.00 297.00 629,585.00 186,986,745.00 TETAP
- Pemasangan Tiang Pancang Minipile Pile Shape 250x250 AT.01' 297.00 Rp. 385,385.00 Rp. 114,459,345.00 297.00 385,385.00 114,459,345.00 TETAP
- Pekerjaan Joint/sambungan Tiang Pancang dan Welding AT. 02 27.00 titik Rp. 347,622.00 Rp. 9,385,794.00 27.00 347,622.00 9,385,794.00 TETAP
- Tes PDA 2.00 titik Rp. 23,000,000.00 Rp. 46,000,000.00 2.00 23,000,000.00 46,000,000.00 TETAP

2 POER
- Type P1 uk. 160x160X30 cm 27.00 bh
- Galian tanah Pondasi Poer A.2.3.1.2. 210.82 m3 Rp. 132,660.00 Rp. 27,966,850.56 210.82 132,660.00 27,966,850.56 TETAP
- Lantai kerja A.4.1.1.1 6.91 m2 Rp. 1,378,547.00 Rp. 9,528,516.86 6.91 1,378,547.00 9,528,516.86 TETAP
- Urugan kembali bekas galian A.2.3.1.9. 158.38 m3 Rp. 39,325.00 Rp. 6,228,372.15 158.38 39,325.00 6,228,372.15 TETAP
- Bekisting 2x pakai A.4.1.1.20 25.92 m2 Rp. 268,378.00 Rp. 6,956,357.76 25.92 268,378.00 6,956,357.76 TETAP
- Pembesian (Besi Ulir) 228.47 kg/m3 A.4.1.1.17 4,737.53 kg Rp. 19,868.20 Rp. 94,126,268.58 - 988.21 19,868.20 19,633,870.01 3,749.33 19,868.20 74,492,398.57 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 20.74 m3 Rp. 1,406,067.00 Rp. 29,156,205.31 20.74 1,406,067.00 29,156,205.31 TETAP

3 PEDESTAL KOLOM
- Kolom K1 uk. 60x60 27.00 bh
- Bekisting 2x pakai A.4.1.1.22 82.62 m2 Rp. 427,174.00 Rp. 35,293,115.88 82.62 427,174.00 35,293,115.88 TETAP
- Pembesian (Besi Ulir) 35.07 kg/m3 A.4.1.1.17 869.29 kg Rp. 19,868.20 Rp. 17,271,318.81 1,114.82 19,868.20 22,149,399.33 1,984.11 19,868.20 39,420,718.14 BERTAMBAH
- Pembesian (Besi Polos) 28.09 kg/m3 A.4.1.1.17 696.11 kg Rp. 18,713.20 Rp. 13,026,535.66 696.11 18,713.20 13,026,535.66 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 24.79 m3 Rp. 1,406,067.00 Rp. 34,850,776.66 24.79 1,406,067.00 34,850,776.66 TETAP

4 PONDASI BATU KALI


- Type PB1 259.05 m'
- Galian tanah pondasi A.2.3.1.1. 310.86 m3 Rp. 108,075.00 Rp. 33,596,194.50 310.86 108,075.00 33,596,194.50 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 15.54 m3 Rp. 571,230.00 Rp. 8,878,627.89 15.54 571,230.00 8,878,627.89 TETAP
- Pas. Batu kosong A.3.2.1.9. 62.17 m3 Rp. 824,802.00 Rp. 51,279,589.94 62.17 824,802.00 51,279,589.94 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 168.38 m3 Rp. 1,016,070.00 Rp. 171,088,406.78 168.38 1,016,070.00 171,088,406.78 TETAP
- Urugan tanah bekas galian A.2.3.1.9. 64.76 m3 Rp. 39,325.00 Rp. 2,546,785.31 64.76 39,325.00 2,546,785.31 TETAP

- Type PB2 38.00 m'


- Galian tanah pondasi A.2.3.1.1. 22.80 m3 Rp. 108,075.00 Rp. 2,464,110.00 22.80 108,075.00 2,464,110.00 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 1.90 m3 Rp. 571,230.00 Rp. 1,085,337.00 1.90 571,230.00 1,085,337.00 TETAP
- Pas. Batu kosong A.3.2.1.9. 7.60 m3 Rp. 824,802.00 Rp. 6,268,495.20 7.60 824,802.00 6,268,495.20 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 16.72 m3 Rp. 1,016,070.00 Rp. 16,988,690.40 16.72 1,016,070.00 16,988,690.40 TETAP
- Urugan tanah bekas galian A.2.3.1.9. (3.42) m3 Rp. 39,325.00 Rp. (134,491.50) 6.84 39,325.00 268,983.00 3.42 39,325.00 134,491.50 BERTAMBAH

5 SLOEF
- Type S1 uk 35/75 259.05 m'
- Bekisting 2x pakai A.4.1.1.21 181.34 m2 Rp. 284,878.00 Rp. 51,658,352.13 181.34 284,878.00 51,658,352.13 TETAP
- Pembesian (Besi Ulir) 177.55 kg/m3 A.4.1.1.17 11,268.74 kg Rp. 19,868.20 Rp. 223,889,523.88 2,062.02 19,868.20 40,968,680.84 9,206.71 19,868.20 182,920,843.04 BERKURANG
- Pembesian (Besi Polos) 63.96 kg/m3 A.4.1.1.17 4,059.48 kg Rp. 18,713.20 Rp. 75,965,941.81 4,059.48 18,713.20 75,965,941.81 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 63.47 m3 Rp. 1,406,067.00 Rp. 89,239,205.81 63.47 1,406,067.00 89,239,205.81 TETAP

- Type S2 uk 25/50 38.00 m'


- Bekisting 2x pakai A.4.1.1.21 19.00 m2 Rp. 284,878.00 Rp. 5,412,682.00 19.00 284,878.00 5,412,682.00 TETAP
- Pembesian (Besi Ulir) 38.53 kg/m3 A.4.1.1.17 183.02 kg Rp. 19,868.20 Rp. 3,636,346.26 224.90 19,868.20 4,468,392.06 407.93 19,868.20 8,104,738.32 BERTAMBAH
- Pembesian (Besi Polos) 48.55 kg/m3 A.4.1.1.17 230.61 kg Rp. 18,713.20 Rp. 4,315,442.28 230.61 18,713.20 4,315,442.28 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 4.75 m3 Rp. 1,406,067.00 Rp. 6,678,818.25 4.75 1,406,067.00 6,678,818.25 TETAP

- Type S3 uk 15/20 3.00 m'


- Bekisting 2x pakai A.4.1.1.21 0.60 m2 Rp. 284,878.00 Rp. 170,926.80 0.60 284,878.00 170,926.80 TETAP
- Pembesian (Besi Polos) 148.84 kg/m3 A.4.1.1.17 13.40 kg Rp. 18,713.20 Rp. 250,669.15 13.40 18,713.20 250,669.15 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.09 m3 Rp. 1,406,067.00 Rp. 126,546.03 0.09 1,406,067.00 126,546.03 TETAP

22
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

6 KOLOM LT.1
- Kolom K1 uk. 60x60 4.94 27.00 bh
- Bekisting 2x pakai A.4.1.1.22 129.60 m2 Rp. 427,174.00 Rp. 55,361,750.40 129.60 427,174.00 55,361,750.40 TETAP
- Pembesian (Besi Ulir) 146.38 kg/m3 A.4.1.1.17 5,691.16 kg Rp. 19,868.20 Rp. 113,073,165.35 3,334.55 19,868.20 66,251,531.22 9,025.71 19,868.20 179,324,696.57 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 38.88 m3 Rp. 1,406,067.00 Rp. 54,667,884.96 38.88 1,406,067.00 54,667,884.96 TETAP

- Kolom KP uk. 15x15 4.94 23.00 bh


- Bekisting 2x pakai A.4.1.1.22 13.80 m2 Rp. 427,174.00 Rp. 5,895,001.20 13.80 427,174.00 5,895,001.20 TETAP
- Pembesian (Besi Polos) 186.76 kg/m3 A.4.1.1.17 386.59 kg Rp. 18,713.20 Rp. 7,234,333.89 332.85 18,713.20 6,228,690.72 719.44 18,713.20 13,463,024.61 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.07 m3 Rp. 1,406,067.00 Rp. 2,910,558.69 2.07 1,406,067.00 2,910,558.69 TETAP

7 TANGGA
- Tangga Beton 1
- Anak Tangga 17.00 bh
Bekisting A.4.1.1.26 17.14 m2 Rp. 391,699.00 Rp. 6,712,154.06 17.14 391,699.00 6,712,154.06 TETAP
Pembesian (Besi Polos) 66.79 kg/m3 A.4.1.1.17 145.33 kg Rp. 18,713.20 Rp. 2,719,581.87 145.33 18,713.20 2,719,581.87 TETAP
Cor Beton K-275 A.4.1.1.9. 2.18 m3 Rp. 1,406,067.00 Rp. 3,059,601.79 2.18 1,406,067.00 3,059,601.79 TETAP

8 PLAT BORDES
- Plat Bordes T=25 3.00 m2
- Bekisting A.4.1.1.24 3.00 m2 Rp. 453,574.00 Rp. 1,360,722.00 3.00 453,574.00 1,360,722.00 TETAP
- Pembesian (Besi Polos) 94.53 kg/m3 A.4.1.1.17 42.54 kg Rp. 18,713.20 Rp. 796,031.46 42.54 18,713.20 796,031.46 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.45 m3 Rp. 1,406,067.00 Rp. 632,730.15 0.45 1,406,067.00 632,730.15 TETAP

9 BALOK TANGGA
- Balok Beton uk. 20x30 6.85 m'
- Bekisting 2x pakai A.4.1.1.23 3.43 m2 Rp. 440,374.00 Rp. 1,508,280.95 3.43 440,374.00 1,508,280.95 TETAP
- Pembesian (Besi Ulir) 104.19 kg/m3 A.4.1.1.17 57.10 kg Rp. 19,868.20 Rp. 1,134,380.80 57.10 19,868.20 1,134,380.80 TETAP
- Pembesian (Besi Polos) 34.85 kg/m3 A.4.1.1.17 19.10 kg Rp. 18,713.20 Rp. 357,409.66 19.10 18,713.20 357,409.66 TETAP
- Cor Beton K-275 A.4.1.1.9. 0.55 m3 Rp. 1,406,067.00 Rp. 770,524.72 0.55 1,406,067.00 770,524.72 TETAP

10 BALOK
- Balok B1 uk. 40x70 246.80 m'
- Bekisting 2x pakai A.4.1.1.23 222.12 m2 Rp. 440,374.00 Rp. 97,815,872.88 222.12 440,374.00 97,815,872.88 TETAP
- Pembesian (Besi Ulir) 154.71 kg/m3 A.4.1.1.17 10,691.00 kg Rp. 19,868.20 Rp. 212,411,020.84 3,194.46 19,868.20 63,468,218.58 13,885.47 19,868.20 275,879,239.42 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 69.10 m3 Rp. 1,406,067.00 Rp. 97,164,853.97 69.10 1,406,067.00 97,164,853.97 TETAP

- Balok Anak B2 uk. 30x50 166.00 m'


- Bekisting 2x pakai A.4.1.1.23 107.90 m2 Rp. 440,374.00 Rp. 47,516,354.60 107.90 440,374.00 47,516,354.60 TETAP
- Pembesian (Besi Ulir) 269.34 kg/m3 A.4.1.1.17 6,706.60 kg Rp. 19,868.20 Rp. 133,248,112.93 1,051.73 19,868.20 20,895,910.79 7,758.33 19,868.20 154,144,023.72 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 24.90 m3 Rp. 1,406,067.00 Rp. 35,011,068.30 24.90 1,406,067.00 35,011,068.30 TETAP

- Balok Anak B3 uk. 15x20 19.02 m'


- Bekisting 2x pakai A.4.1.1.23 5.23 m2 Rp. 440,374.00 Rp. 2,303,376.21 5.23 440,374.00 2,303,376.21 TETAP
- Pembesian (Besi Ulir) 138.92 kg/m3 A.4.1.1.17 79.27 kg Rp. 19,868.20 Rp. 1,574,884.88 3.50 19,868.20 69,539.81 82.77 19,868.20 1,644,424.69 BERTAMBAH
- Pembesian (Besi Polos) 104.12 kg/m3 A.4.1.1.17 59.41 kg Rp. 18,713.20 Rp. 1,111,767.53 59.41 18,713.20 1,111,767.53 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 0.57 m3 Rp. 1,406,067.00 Rp. 802,301.83 0.57 1,406,067.00 802,301.83 TETAP

11 PLAT LANTAI
- Plat Lantai 2 531.80 m2
- Steel floor decking 1 m2 Bondek 0.75 AT. 05 531.80 m2 Rp. 626,824.00 Rp. 333,345,003.20 531.80 626,824.00 333,345,003.20 TETAP
- Pembesian wiremesh 2 Lapis M-8 1 m2 A.4.1.1.19 531.80 m2 Rp. 78,628.00 Rp. 41,814,370.40 531.80 78,628.00 41,814,370.40 1,063.60 78,628.00 83,628,740.80 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 63.82 m3 Rp. 1,406,067.00 Rp. 89,729,571.67 63.82 1,406,067.00 89,729,571.67 TETAP
- Waterproofing SikaTop Seal AT. 06 22.80 m2 Rp. 59,763.00 Rp. 1,362,596.40 22.80 59,763.00 1,362,596.40 TETAP

12 KOLOM LT.2
- Kolom K1 uk. 60x60 4.94 27.00 bh
- Bekisting 2x pakai A.4.1.1.22 129.60 m2 Rp. 427,174.00 Rp. 55,361,750.40 129.60 427,174.00 55,361,750.40 TETAP
- Pembesian (Besi Ulir) 146.38 kg/m3 A.4.1.1.17 5,691.16 kg Rp. 19,868.20 Rp. 113,073,165.35 3,334.55 19,868.20 66,251,531.22 9,025.71 19,868.20 179,324,696.57 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 38.88 m3 Rp. 1,406,067.00 Rp. 54,667,884.96 38.88 1,406,067.00 54,667,884.96 TETAP

- Kolom KP uk. 15x15 4.94 23.00 bh


- Bekisting 2x pakai A.4.1.1.22 13.80 m2 Rp. 427,174.00 Rp. 5,895,001.20 13.80 427,174.00 5,895,001.20 TETAP
- Pembesian (Besi Polos) 186.76 kg/m3 A.4.1.1.17 386.59 kg Rp. 18,713.20 Rp. 7,234,333.89 99.35 18,713.20 1,859,233.37 485.94 18,713.20 9,093,567.26 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 2.07 m3 Rp. 1,406,067.00 Rp. 2,910,558.69 2.07 1,406,067.00 2,910,558.69 TETAP

13 RING BALOK
- Ring Balok uk. 30x65 238.05 m'
- Bekisting 2x pakai A.4.1.1.23 190.44 m2 Rp. 440,374.00 Rp. 83,864,824.56 190.44 440,374.00 83,864,824.56 TETAP
- Pembesian (Besi Ulir) 72.84 kg/m3 A.4.1.1.17 3,381.30 kg Rp. 19,868.20 Rp. 67,180,350.38 6,705.04 19,868.20 133,216,990.53 10,086.34 19,868.20 200,397,340.92 BERTAMBAH
- Pembesian (Besi Polos) 41.31 kg/m3 A.4.1.1.17 1,917.64 kg Rp. 18,713.20 Rp. 35,885,098.14 1,917.64 18,713.20 35,885,098.14 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 46.42 m3 Rp. 1,406,067.00 Rp. 65,269,278.62 46.42 1,406,067.00 65,269,278.62 TETAP

- Ring Balok uk. 25x50 126.50 m'


- Bekisting 2x pakai A.4.1.1.23 79.06 m2 Rp. 440,374.00 Rp. 34,817,069.38 79.06 440,374.00 34,817,069.38 TETAP
- Pembesian (Besi Ulir) 98.25 kg/m3 A.4.1.1.17 1,553.51 kg Rp. 19,868.20 Rp. 30,865,368.31 1,936.60 19,868.20 38,476,835.20 3,490.11 19,868.20 69,342,203.50 BERTAMBAH
- Pembesian (Besi Polos) 61.55 kg/m3 A.4.1.1.17 973.28 kg Rp. 18,713.20 Rp. 18,213,199.76 973.28 18,713.20 18,213,199.76 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 A.4.1.1.9. 15.81 m3 Rp. 1,406,067.00 Rp. 22,233,434.44 15.81 1,406,067.00 22,233,434.44 TETAP

23
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

- Ring Balok uk. 15x20 24.20 m'


- Bekisting 2x pakai A.4.1.1.23 6.66 m2 Rp. 440,374.00 Rp. 2,930,688.97 6.66 440,374.00 2,930,688.97 TETAP
- Pembesian (Besi Polos) 132.18 kg/m3 A.4.1.1.17 95.96 kg Rp. 18,713.20 Rp. 1,795,736.22 48.20 18,713.20 902,021.07 144.16 18,713.20 2,697,757.29 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.73 m3 Rp. 1,406,067.00 Rp. 1,020,804.64 0.73 1,406,067.00 1,020,804.64 TETAP

14 ROOF TOP
- Plat Roof Top 290.00 m2
- Bekisting Plat Lantai A.4.1.1.24 290.00 m2 Rp. 453,574.00 Rp. 131,536,460.00 290.00 453,574.00 131,536,460.00 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 5,339.71 kg Rp. 18,713.20 Rp. 99,923,098.60 5,339.71 18,713.20 99,923,098.60 TETAP
- Cor Beton K-275 A.4.1.1.9. 34.80 m3 Rp. 1,406,067.00 Rp. 48,931,131.60 34.80 1,406,067.00 48,931,131.60 TETAP
- Waterproofing SikaTop Seal AT. 06 302.16 m2 Rp. 59,763.00 Rp. 18,057,988.08 302.16 59,763.00 18,057,988.08 TETAP
- Waterproofing Membrane Bakar Membrane m2 Rp. - Rp. - 302.16 375,000.00 113,310,000.00 302.16 375,000.00 113,310,000.00 BERTAMBAH

- Kolom KP uk. 15x15 4.94 23.00 bh


- Bekisting 2x pakai A.4.1.1.22 13.80 m2 Rp. 427,174.00 Rp. 5,895,001.20 13.80 427,174.00 5,895,001.20 TETAP
- Pembesian (Besi Polos) 186.76 kg/m3 A.4.1.1.17 386.59 kg Rp. 18,713.20 Rp. 7,234,333.89 386.59 18,713.20 7,234,333.89 TETAP
- Cor Beton K-275 A.4.1.1.9. 2.07 m3 Rp. 1,406,067.00 Rp. 2,910,558.69 2.07 1,406,067.00 2,910,558.69 TETAP

- Ring Balok uk. 15x20 35.00 m'


- Bekisting 2x pakai A.4.1.1.23 9.63 m2 Rp. 440,374.00 Rp. 4,238,599.75 9.63 440,374.00 4,238,599.75 TETAP
- Pembesian (Besi Polos) 132.18 kg/m3 A.4.1.1.17 138.79 kg Rp. 18,713.20 Rp. 2,597,139.16 138.79 18,713.20 2,597,139.16 TETAP
- Cor Beton K-275 A.4.1.1.9. 1.05 m3 Rp. 1,406,067.00 Rp. 1,476,370.35 1.05 1,406,067.00 1,476,370.35 TETAP

15 RANGKA ATAP
- Pasang Kuda-Kuda Baja Ringan Atap Jurai A.4.2.1.23. 356.72 m2 Rp. 346,238.00 Rp. 123,510,019.36 356.72 346,238.00 123,510,019.36 TETAP

16 PENUTUP ATAP
- Pekerjaan Penutup Atap Jurai
- Pekerjaan Alumunium Foil A.4.5.2.43. 356.72 m2 Rp. 180,609.00 Rp. 64,426,842.48 356.72 180,609.00 64,426,842.48 TETAP
- Pekerjaan Atap Bitumen Gelombang AT. 03 356.72 m2 Rp. 192,951.00 Rp. 68,829,480.72 356.72 192,951.00 68,829,480.72 TETAP
- Pekerjaan Nok Atap Bitumen AT. 04 45.40 m' Rp. 135,349.00 Rp. 6,144,844.60 45.40 135,349.00 6,144,844.60 TETAP

JUMLAH HARGA PEKERJAAN STRUKTUR Rp. 3,928,978,086.14 579,631,647.30 209,120,536.03 4,299,489,197.42

III PEKERJAAN ARSITEKTUR


1 PEKERJAAN DINDING
- Pekerjaan Dinding
- Pas. Dinding Bata Ringan Bata Ringan T:10 cm A.4.4.1.26 1,025.91 m2 Rp. 184,283.00 Rp. 189,057,477.68 1,025.91 184,283.00 189,057,477.68 TETAP
- Plesteran campuran 1 : 4 Camp. 1:4 T 15mm A.4.4.2.4. 1,675.18 m2 Rp. 89,139.00 Rp. 149,323,584.78 1,675.18 89,139.00 149,323,584.78 TETAP
- Plesteran campuran 1 : 2 (Trasram) Camp. 1:2 T 15mm A.4.4.2.2. 376.64 m2 Rp. 93,514.00 Rp. 35,221,112.96 376.64 93,514.00 35,221,112.96 TETAP
- Acian A.4.4.2.27. 2,051.82 m2 Rp. 50,985.00 Rp. 104,611,879.55 2,051.82 50,985.00 104,611,879.55 TETAP
- Pas. Granite Dinding Granito 25x60 A.4.4.3.56 48.80 m2 Rp. 553,512.00 Rp. 27,011,385.60 48.80 553,512.00 27,011,385.60 TETAP

2 PEKERJAAN LANTAI
- Pekerjaan Lantai
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 6.16 m3 Rp. 571,230.00 Rp. 3,518,776.80 6.16 571,230.00 3,518,776.80 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 3.02 m3 Rp. 1,378,547.00 Rp. 4,161,006.26 3.02 1,378,547.00 4,161,006.26 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 1,252.25 m2 Rp. 392,667.00 Rp. 491,717,250.75 1,252.25 392,667.00 491,717,250.75 TETAP
- Pekerjaan Granit tile 60x60 (Unpolish) Gelap A.4.4.3.55. 40.60 m2 Rp. 398,778.00 Rp. 16,190,386.80 40.60 398,778.00 16,190,386.80 TETAP

3 PEKERJAAN PINTU, JENDELA DAN ACCSESORIES


- Pekerjaan Pintu
- Pintu Type (D1) 2.00 bh
Kusen UPVC UPVC Retto Putih AT. 07 16.84 m' Rp. 455,733.00 Rp. 7,674,543.72 16.84 455,733.00 7,674,543.72 TETAP
Kaca Tempered Glass 12 mm AT. 11 14.21 m2 Rp. 1,896,244.00 Rp. 26,945,627.24 14.21 1,896,244.00 26,945,627.24 TETAP
Sticker Sandblast AT. 12 14.21 m2 Rp. 81,873.00 Rp. 1,163,415.33 14.21 81,873.00 1,163,415.33 TETAP
Handle Pintu Stainless AT. 15 4.00 bh Rp. 1,339,844.00 Rp. 5,359,376.00 4.00 1,339,844.00 5,359,376.00 TETAP
Engsel Pintu Kaca Tempered AT. 13 4.00 bh Rp. 2,634,082.00 Rp. 10,536,328.00 4.00 2,634,082.00 10,536,328.00 TETAP
Kunci Kaca Tempered AT. 14 4.00 bh Rp. 1,112,188.00 Rp. 4,448,752.00 4.00 1,112,188.00 4,448,752.00 TETAP

- Pintu Type (D2) 1.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 8.35 m' Rp. 455,733.00 Rp. 3,806,282.02 8.35 455,733.00 3,806,282.02 TETAP
Kaca Tempered Glass 12 mm AT. 11 6.86 m2 Rp. 1,896,244.00 Rp. 13,008,233.84 6.86 1,896,244.00 13,008,233.84 TETAP
Sticker Sandblast AT. 12 6.86 m2 Rp. 81,873.00 Rp. 561,648.78 6.86 81,873.00 561,648.78 TETAP
Handle Pintu Stainless AT. 15 2.00 bh Rp. 1,339,844.00 Rp. 2,679,688.00 2.00 1,339,844.00 2,679,688.00 TETAP
Engsel Pintu Kaca Tempered AT. 13 2.00 bh Rp. 2,634,082.00 Rp. 5,268,164.00 2.00 2,634,082.00 5,268,164.00 TETAP
Kunci Kaca Tempered AT. 14 2.00 bh Rp. 1,112,188.00 Rp. 2,224,376.00 2.00 1,112,188.00 2,224,376.00 TETAP

- Pintu Type (D3) 8.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 49.74 m' Rp. 455,733.00 Rp. 22,669,982.35 49.74 455,733.00 22,669,982.35 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 97.60 m' Rp. 625,133.00 Rp. 61,012,980.80 97.60 625,133.00 61,012,980.80 TETAP
Panil UPVC AT. 10 25.60 m2 Rp. 584,433.00 Rp. 14,961,484.80 25.60 584,433.00 14,961,484.80 TETAP
Kaca T.5mm A.4.6.2.17. 2.91 m2 Rp. 343,495.00 Rp. 1,000,257.44 2.91 343,495.00 1,000,257.44 TETAP
Sticker Sandblast AT. 12 2.91 m2 Rp. 81,873.00 Rp. 238,414.18 2.91 81,873.00 238,414.18 TETAP
Handle Pintu + Lockcase AT. 16 16.00 bh Rp. 800,844.00 Rp. 12,813,504.00 16.00 800,844.00 12,813,504.00 TETAP
Engsel Pintu A.4.6.2.5. 48.00 bh Rp. 70,970.00 Rp. 3,406,560.00 48.00 70,970.00 3,406,560.00 TETAP
Kunci Tanam A.4.6.2.2. 8.00 bh Rp. 288,365.00 Rp. 2,306,920.00 8.00 288,365.00 2,306,920.00 TETAP
Door Closer A.4.6.2.10. 8.00 bh Rp. 766,469.00 Rp. 6,131,752.00 8.00 766,469.00 6,131,752.00 TETAP

24
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

- Pintu Type (D4) 4.00 bh


Kusen UPVC UPVC Retto Putih AT. 07 21.27 m' Rp. 455,733.00 Rp. 9,694,352.38 21.27 455,733.00 9,694,352.38 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 24.40 m' Rp. 625,133.00 Rp. 15,253,245.20 24.40 625,133.00 15,253,245.20 TETAP
Panil UPVC AT. 10 13.12 m2 Rp. 584,433.00 Rp. 7,667,760.96 13.12 584,433.00 7,667,760.96 TETAP
Kaca T.5mm A.4.6.2.17. 0.73 m2 Rp. 343,495.00 Rp. 250,064.36 0.73 343,495.00 250,064.36 TETAP
Sticker Sandblast AT. 12 0.73 m2 Rp. 81,873.00 Rp. 59,603.54 0.73 81,873.00 59,603.54 TETAP
Handle Pintu + Lockcase AT. 16 4.00 bh Rp. 800,844.00 Rp. 3,203,376.00 4.00 800,844.00 3,203,376.00 TETAP
Engsel Pintu A.4.6.2.5. 12.00 bh Rp. 70,970.00 Rp. 851,640.00 12.00 70,970.00 851,640.00 TETAP
Kunci Tanam A.4.6.2.2. 4.00 bh Rp. 288,365.00 Rp. 1,153,460.00 4.00 288,365.00 1,153,460.00 TETAP
Door Closer A.4.6.2.10. 4.00 bh Rp. 766,469.00 Rp. 3,065,876.00 4.00 766,469.00 3,065,876.00 TETAP

- Pintu Type (D5) 4.00 bh Rp. 858,000.00 Rp. 3,432,000.00 4.00 858,000.00 3,432,000.00 TETAP
Kusen UPVC UPVC Retto Putih AT. 07 18.00 m' Rp. 455,733.00 Rp. 8,203,194.00 18.00 455,733.00 8,203,194.00 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 08 26.40 m' Rp. 625,133.00 Rp. 16,503,511.20 26.40 625,133.00 16,503,511.20 TETAP
Panil UPVC AT. 10 4.44 m2 Rp. 584,433.00 Rp. 2,594,882.52 4.44 584,433.00 2,594,882.52 TETAP
Handle Pintu + Lockcase AT. 16 4.00 bh Rp. 800,844.00 Rp. 3,203,376.00 4.00 800,844.00 3,203,376.00 TETAP
Engsel Pintu A.4.6.2.5. 12.00 bh Rp. 70,970.00 Rp. 851,640.00 12.00 70,970.00 851,640.00 TETAP

- Pekerjaan Jendela
- Jendela Type (J1) 6.00 bh
Kusen UPVC UPVC Retto Putih AT. 08 305.04 m' Rp. 455,733.00 Rp. 139,016,794.32 305.04 455,733.00 139,016,794.32 TETAP
Kaca T.5mm A.4.6.2.17. 93.60 m2 Rp. 343,495.00 Rp. 32,151,132.00 93.60 343,495.00 32,151,132.00 TETAP

- Jendela Type (J2) 2.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 83.48 m' Rp. 455,733.00 Rp. 38,044,590.84 83.48 455,733.00 38,044,590.84 TETAP
Kaca T.5mm A.4.6.2.17. 23.40 m2 Rp. 343,495.00 Rp. 8,037,783.00 23.40 343,495.00 8,037,783.00 TETAP

- Jendela Type (J3) 6.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 389.04 m' Rp. 455,733.00 Rp. 177,298,366.32 389.04 455,733.00 177,298,366.32 TETAP
Kaca T.5mm A.4.6.2.17. 129.60 m2 Rp. 343,495.00 Rp. 44,516,952.00 129.60 343,495.00 44,516,952.00 TETAP

- Jendela Type (J4) 2.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 74.00 m' Rp. 455,733.00 Rp. 33,724,242.00 74.00 455,733.00 33,724,242.00 TETAP
Kaca T.5mm A.4.6.2.17. 19.84 m2 Rp. 343,495.00 Rp. 6,814,940.80 19.84 343,495.00 6,814,940.80 TETAP

- Jendela Type (J5) 3.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 115.25 m' Rp. 455,733.00 Rp. 52,520,949.59 115.25 455,733.00 52,520,949.59 TETAP
Kaca T.5mm A.4.6.2.17. 31.50 m2 Rp. 343,495.00 Rp. 10,820,092.50 31.50 343,495.00 10,820,092.50 TETAP

- Jendela Type (J6) 4.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 98.30 m' Rp. 455,733.00 Rp. 44,798,553.90 98.30 455,733.00 44,798,553.90 TETAP
Kaca T.5mm A.4.6.2.17. 18.60 m2 Rp. 343,495.00 Rp. 6,389,007.00 18.60 343,495.00 6,389,007.00 TETAP

- Jendela Type (J7) 2.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 37.04 m' Rp. 455,733.00 Rp. 16,880,350.32 37.04 455,733.00 16,880,350.32 TETAP
Kaca T.5mm A.4.6.2.17. 8.40 m2 Rp. 343,495.00 Rp. 2,885,358.00 8.40 343,495.00 2,885,358.00 TETAP

- Jendela Type (J8) 3.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 100.95 m' Rp. 455,733.00 Rp. 46,006,246.35 100.95 455,733.00 46,006,246.35 TETAP
Bingkai Daun UPVC UPVC Retto Putih AT. 09 48.48 m' Rp. 504,133.00 Rp. 24,440,367.84 48.48 504,133.00 24,440,367.84 TETAP
Kaca T.5mm A.4.6.2.17. 18.78 m2 Rp. 343,495.00 Rp. 6,452,155.12 18.78 343,495.00 6,452,155.12 TETAP
Engsel Jendela Casement Dekkson FS SS 14" A.4.6.2.7. 24.00 bh Rp. 277,849.00 Rp. 6,668,376.00 24.00 277,849.00 6,668,376.00 TETAP
Grendel Slot/Kunci Slot UPVC A.4.6.2.11. 12.00 bh Rp. 574,948.00 Rp. 6,899,376.00 12.00 574,948.00 6,899,376.00 TETAP

- Jendela Type (J9) 1.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 29.29 m' Rp. 455,733.00 Rp. 13,346,140.91 29.29 455,733.00 13,346,140.91 TETAP
Kaca T.5mm A.4.6.2.17. 6.09 m2 Rp. 343,495.00 Rp. 2,091,884.55 6.09 343,495.00 2,091,884.55 TETAP

- Jendela Type (J10) 1.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 41.04 m' Rp. 455,733.00 Rp. 18,703,282.32 41.04 455,733.00 18,703,282.32 TETAP
Kaca T.5mm A.4.6.2.17. 11.02 m2 Rp. 343,495.00 Rp. 3,785,314.90 11.02 343,495.00 3,785,314.90 TETAP

- Jendela Type (J11) 1.00 bh


Kusen UPVC UPVC Retto Putih AT. 08 37.00 m' Rp. 455,733.00 Rp. 16,862,121.00 37.00 455,733.00 16,862,121.00 TETAP
Kaca T.5mm A.4.6.2.17. 9.60 m2 Rp. 343,495.00 Rp. 3,297,552.00 9.60 343,495.00 3,297,552.00 TETAP

4 PEKERJAAN PLAFOND
- Pekerjaan Rangka Plafond
- Rangka Hollow A.4.2.1.21. 57.00 m2 Rp. 167,959.00 Rp. 9,573,663.00 57.00 167,959.00 9,573,663.00 TETAP

- Pekerjaan Penutup Plafond


- Pek. Plafond Akustik + Rangka A.4.5.1.8. 1,183.65 m2 Rp. 433,004.00 Rp. 512,525,184.60 1,183.65 433,004.00 512,525,184.60 TETAP
- Pek. Plafond PVC A.4.5.1.10. 57.00 m2 Rp. 142,626.00 Rp. 8,129,682.00 57.00 142,626.00 8,129,682.00 TETAP
- Pek. List Plafond PVC A.4.5.1.10.a 52.00 m' Rp. 42,262.00 Rp. 2,197,624.00 52.00 42,262.00 2,197,624.00 TETAP

5 PEKERJAAN PENGECATAN
- Pekerjaan Pengecatan
- Pek. Cat luar A.4.7.1.10. 2,051.82 m2 Rp. 57,629.00 Rp. 118,244,150.37 2,051.82 57,629.00 118,244,150.37 TETAP

25
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

- Pek. Cat dalam A.4.7.1.10.a 2,051.82 m2 Rp. 49,049.00 Rp. 100,639,562.22 2,051.82 49,049.00 100,639,562.22 TETAP

6 PEKERJAAN LAIN-LAIN
- Pekerjaan Railing besi
- Pekerjaan Railing Stainless (Rangka Kaca Tempered) AT. 17 38.64 m' Rp. 1,004,740.00 Rp. 38,823,153.60 38.64 1,004,740.00 38,823,153.60 TETAP
- Pekerjaan Kaca Tempered 10 mm AT. 11a 28.21 m2 Rp. 1,037,144.00 Rp. 29,254,928.24 28.21 1,037,144.00 29,254,928.24 TETAP

- Pekerjaan ACP
- Pek. ACP PVDF 4 mm Glossy Alloy 1100 + Rangka AT. 18 623.40 m2 Rp. 1,022,555.00 Rp. 637,462,995.72 623.40 1,022,555.00 637,462,995.72 TETAP

- Pekerjaan Signed Text dan Logo


- Pekerjaan Signed Text AT. 19 623.00 cm Rp. 13,849.00 Rp. 8,627,927.00 623.00 13,849.00 8,627,927.00 TETAP
- Pekerjaan Signed Logo AT. 19 208.00 cm Rp. 13,849.00 Rp. 2,880,592.00 208.00 13,849.00 2,880,592.00 TETAP

JUMLAH HARGA PEKERJAAN ARSITEKTUR Rp. 3,535,830,526.15 - - 3,535,830,526.15

IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pekerjaan Kabel-Kabel
- Dari KWH ke panel MDP NYY 4x50 mm2 AT. 26 10.00 m' Rp. 490,050.00 Rp. 4,900,500.00 10.00 490,050.00 4,900,500.00 TETAP
- Dari MDP ke PP-LP NYY 4x4 mm2 + NYA 1x4 mm2 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari MDP ke PP-SK & AC NYY 4x25 mm2 + NYA 1x16 mm3 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP
- Dari MDP ke SDP-Lt.2 NYY 4x35 mm2 + NYA 1x16 mm4 AT. 24 10.00 m' Rp. 464,933.33 Rp. 4,649,333.33 10.00 464,933.33 4,649,333.33 TETAP
- Dari SDP-Lt.2 ke PP-LP Lt.2 NYY 4x4 mm2 + NYA 1x4 mm5 AT. 20 4.00 m' Rp. 197,156.67 Rp. 788,626.67 4.00 197,156.67 788,626.67 TETAP
- Dari SDP-Lt.2 ke PP-SK & AC Lt.2 NYY 4x25 mm2 + NYA 1x16 mm6 AT. 23 6.00 m' Rp. 406,633.33 Rp. 2,439,800.00 6.00 406,633.33 2,439,800.00 TETAP

- Peketrjaan Panel
- MDP (Main Distribution Panel) Harga Material 1.00 unit Rp. 15,000,000.00 Rp. 15,000,000.00 1.00 15,000,000.00 15,000,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.1 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- SDP (Sub Distribution Panel) Lt. 2 Harga Material 1.00 unit Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP
- PP (Power Panel)-LP (Lighting Panel) Lt.2 Harga Material 1.00 unit Rp. 3,500,000.00 Rp. 3,500,000.00 1.00 3,500,000.00 3,500,000.00 TETAP
- PP - SK & AC Lt.2 Harga Material 1.00 unit Rp. 5,000,000.00 Rp. 5,000,000.00 1.00 5,000,000.00 5,000,000.00 TETAP
- Pentanahan Elektrikal MAX 2 OHM Harga Material 1.00 titik Rp. 7,000,000.00 Rp. 7,000,000.00 1.00 7,000,000.00 7,000,000.00 TETAP

- Pek. Instalasi Penerangan & Stop Kontak Lantai 01


- Lampu RM TL led 2X9 Watt AT. 35 52.00 bh Rp. 581,166.67 Rp. 30,220,666.67 52.00 581,166.67 30,220,666.67 TETAP
- Lampu Downlight RD 150 LED 9 Watt AT. 31 19.00 bh Rp. 247,866.67 Rp. 4,709,466.67 19.00 247,866.67 4,709,466.67 TETAP
- Lampu exit LED c/w nicad battery AT. 33 2.00 bh Rp. 1,358,866.67 Rp. 2,717,733.33 2.00 1,358,866.67 2,717,733.33 TETAP
- Celling Exhaust Fan 150 cfm, 1 ph AT. 40 5.00 bh Rp. 756,721.43 Rp. 3,783,607.14 5.00 756,721.43 3,783,607.14 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 38.00 bh Rp. 60,995.00 Rp. 2,317,810.00 38.00 60,995.00 2,317,810.00 TETAP
- Stop kontak lantai (2 Stopkontak) AT. 45 12.00 bh Rp. 203,610.00 Rp. 2,443,320.00 12.00 203,610.00 2,443,320.00 TETAP
- Saklar tunggal AT. 41 12.00 bh Rp. 48,130.50 Rp. 577,566.00 12.00 48,130.50 577,566.00 TETAP
- Saklar ganda AT. 43 6.00 bh Rp. 75,350.00 Rp. 452,100.00 6.00 75,350.00 452,100.00 TETAP
- Saklar hotel AT. 42 3.00 bh Rp. 80,905.00 Rp. 242,715.00 3.00 80,905.00 242,715.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 50.00 ttk Rp. 268,950.00 Rp. 13,447,500.00 50.00 268,950.00 13,447,500.00 TETAP
- Instalasi titik lampu (NYM 3X2,5 mm2 dalam conduit) AT. 46 73.00 ttk Rp. 268,950.00 Rp. 19,633,350.00 73.00 268,950.00 19,633,350.00 TETAP
- Instalasi Exhaust Fan (NYM 3X2,5 mm2 dalam conduit) AT. 48 5.00 ttk Rp. 164,670.00 Rp. 823,350.00 5.00 164,670.00 823,350.00 TETAP

- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort dan AT. 30 20.00 m' Rp. 273,900.00 Rp. 5,478,000.00 20.00 273,900.00 5,478,000.00 TETAP
accessories lainnya

- Pek. Instalasi Penerangan & Stop Kontak Lantai 02


- Lampu RM TL led 2X9 Watt AT. 35 53.00 bh Rp. 581,166.67 Rp. 30,801,833.33 53.00 581,166.67 30,801,833.33 TETAP
- Lampu Downlight RD 150 LED 9 Watt AT. 31 17.00 bh Rp. 247,866.67 Rp. 4,213,733.33 17.00 247,866.67 4,213,733.33 TETAP
- Lampu exit LED c/w nicad battery AT. 33 1.00 bh Rp. 1,358,866.67 Rp. 1,358,866.67 1.00 1,358,866.67 1,358,866.67 TETAP
- Celling Exhaust Fan 150 cfm, 1 ph AT. 40 5.00 bh Rp. 756,721.43 Rp. 3,783,607.14 5.00 756,721.43 3,783,607.14 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 4.00 bh Rp. 60,995.00 Rp. 243,980.00 4.00 60,995.00 243,980.00 TETAP
- Stop kontak lantai (2 Stopkontak) AT. 45 50.00 bh Rp. 203,610.00 Rp. 10,180,500.00 50.00 203,610.00 10,180,500.00 TETAP
- Saklar tunggal AT. 41 11.00 bh Rp. 48,130.50 Rp. 529,435.50 11.00 48,130.50 529,435.50 TETAP
- Saklar ganda AT. 43 6.00 bh Rp. 75,350.00 Rp. 452,100.00 6.00 75,350.00 452,100.00 TETAP
- Saklar hotel AT. 42 1.00 bh Rp. 80,905.00 Rp. 80,905.00 1.00 80,905.00 80,905.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 50.00 ttk Rp. 268,950.00 Rp. 13,447,500.00 50.00 268,950.00 13,447,500.00 TETAP
- Instalasi titik lampu (NYM 3X2,5 mm2 dalam conduit) AT. 46 71.00 ttk Rp. 268,950.00 Rp. 19,095,450.00 71.00 268,950.00 19,095,450.00 TETAP
- Instalasi Exhaust Fan (NYM 3X2,5 mm2 dalam conduit) AT. 48 5.00 ttk Rp. 164,670.00 Rp. 823,350.00 5.00 164,670.00 823,350.00 TETAP

- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort dan AT. 30 20.00 m' Rp. 273,900.00 Rp. 5,478,000.00 20.00 273,900.00 5,478,000.00 TETAP
accessories lainnya

- Pekerjaan Penangkal Petir Dan Pentanahan


- Air Terminal, Radius Proteksi Minimal 120 Meter AT. 49 1.00 unit Rp. 6,210,402.00 Rp. 6,210,402.00 1.00 6,210,402.00 6,210,402.00 TETAP
- Obstruction Light led 5 W AT. 51 1.00 bh Rp. 5,988,400.00 Rp. 5,988,400.00 1.00 5,988,400.00 5,988,400.00 TETAP
- Conductor Cable NYY 1x70 mm2 dalam pipa conduit AT. 50 60.00 m' Rp. 141,900.00 Rp. 8,514,000.00 60.00 141,900.00 8,514,000.00 TETAP
- Cable Clamp, Support & accesories dan material bantu lain 1.00 ls Rp. 851,400.00 Rp. 851,400.00 1.00 851,400.00 851,400.00 TETAP
- Grounding max 2 ohm/electroda pentanahan AT. 52 1.00 titik Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Tiang Harga Material 1.00 ls Rp. 1,300,000.00 Rp. 1,300,000.00 1.00 1,300,000.00 1,300,000.00 TETAP

- Pekerjaan Pentanahan
- Pentanahan Listrik Arus Kuat AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Pentanahan Listrik Arus Lemah AT. 52 1.00 ttk Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP

26
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

- Pekerjaan Fire Alarm Lantai 01


- MCFA 5 Zone c/w battery & charge Harga Material 1.00 unit Rp. 25,000,000.00 Rp. 25,000,000.00 1.00 25,000,000.00 25,000,000.00 TETAP
- ROR Heat Detector AT. 55 12.00 bh Rp. 240,196.00 Rp. 2,882,352.00 12.00 240,196.00 2,882,352.00 TETAP
- Smoke Detector AT. 54 28.00 bh Rp. 494,186.00 Rp. 13,837,208.00 28.00 494,186.00 13,837,208.00 TETAP
- Alarm Bell AT. 57 2.00 bh Rp. 241,780.00 Rp. 483,560.00 2.00 241,780.00 483,560.00 TETAP
- Manual Push Button AT. 56 2.00 bh Rp. 149,380.00 Rp. 298,760.00 2.00 149,380.00 298,760.00 TETAP
- Indicator Lamp AT. 58 2.00 bh Rp. 218,680.00 Rp. 437,360.00 2.00 218,680.00 437,360.00 TETAP

- Pengkabelan dari MDF-FA ke TB-FA NYA 3x2.5 mm2 dalam pipa conduit AT. 61 8.00 m' Rp. 268,950.00 Rp. 2,151,600.00 8.00 268,950.00 2,151,600.00 TETAP

- Instalasi Fire Alarm kabel NYA 2x1.5 mm2 dalam pipa conduit AT. 60 46.00 ttk Rp. 233,750.00 Rp. 10,752,500.00 46.00 233,750.00 10,752,500.00 TETAP
- Portable Fire extinguisher dry chemical class abc 3 kg Harga Material 8.00 bh Rp. 800,000.00 Rp. 6,400,000.00 8.00 800,000.00 6,400,000.00 TETAP

- Pekerjaan Fire Alarm Lantai 02


- Terminal Box ( TB - FA ) Harga Material 1.00 unit Rp. 1,500,000.00 Rp. 1,500,000.00 1.00 1,500,000.00 1,500,000.00 TETAP
- ROR Heat Detector AT. 55 12.00 bh Rp. 240,196.00 Rp. 2,882,352.00 12.00 240,196.00 2,882,352.00 TETAP
- Smoke Detector AT. 54 28.00 bh Rp. 494,186.00 Rp. 13,837,208.00 28.00 494,186.00 13,837,208.00 TETAP
- Alarm Bell AT. 57 2.00 bh Rp. 241,780.00 Rp. 483,560.00 2.00 241,780.00 483,560.00 TETAP
- Manual Push Button AT. 56 2.00 bh Rp. 149,380.00 Rp. 298,760.00 2.00 149,380.00 298,760.00 TETAP
- Indicator Lamp AT. 58 2.00 bh Rp. 218,680.00 Rp. 437,360.00 2.00 218,680.00 437,360.00 TETAP
- Instalasi Fire Alarm kabel NYMA 2x1.5 mm2 dalam pipa conduit AT. 60 46.00 ttk Rp. 233,750.00 Rp. 10,752,500.00 46.00 233,750.00 10,752,500.00 TETAP
- Portable Fire extinguisher dry chemical class abc 3 kg Harga Material 8.00 bh Rp. 800,000.00 Rp. 6,400,000.00 8.00 800,000.00 6,400,000.00 TETAP

- Pekerjaan Ac Lantai 01

- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa AT. 64 6.00 unit Rp. 10,288,608.00 Rp. 61,731,648.00 6.00 10,288,608.00 61,731,648.00 TETAP
refrigran (2PK)
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 6.00 bh Rp. 79,860.00 Rp. 479,160.00 6.00 79,860.00 479,160.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 6.00 titik Rp. 402,710.00 Rp. 2,416,260.00 6.00 402,710.00 2,416,260.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 60.00 m' Rp. 15,000.00 Rp. 900,000.00 60.00 15,000.00 900,000.00 TETAP

- Pekerjaan Ac Lantai 02

- AC Split System - Wall mounted type, 18.000 BTU/h Termasuk Pipa AT. 64 6.00 unit Rp. 10,288,608.00 Rp. 61,731,648.00 6.00 10,288,608.00 61,731,648.00 TETAP
refrigran (2 PK)
- Stop kontak AC 16A, 1ph , 3 kaki AT. 67 6.00 bh Rp. 79,860.00 Rp. 479,160.00 6.00 79,860.00 479,160.00 TETAP
- Instalasi stop kontak AC (NYM 3X2,5 mm2 dalam conduit) AT. 69 6.00 titik Rp. 402,710.00 Rp. 2,416,260.00 6.00 402,710.00 2,416,260.00 TETAP
- Pipa Drain AC PVC AW 3/4" terbungkus armaflex Harga Material 120.00 m' Rp. 15,000.00 Rp. 1,800,000.00 120.00 15,000.00 1,800,000.00 TETAP

2 PEKERJAAN PLUMBING
- Pekerjaan Air Bersih Lantai 1
- Roof Tank Kapasitas 4 m3 FRP AT. 70 1.00 bh Rp. 14,286,470.00 Rp. 14,286,470.00 1.00 14,286,470.00 14,286,470.00 TETAP
- Pipa PVC AW dia 40 mm A.5.1.1 28. a 20.00 m' Rp. 85,239.00 Rp. 1,704,780.00 20.00 85,239.00 1,704,780.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 62.00 m' Rp. 58,509.00 Rp. 3,627,558.00 62.00 58,509.00 3,627,558.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 31.00 m' Rp. 50,886.00 Rp. 1,577,466.00 31.00 50,886.00 1,577,466.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 64.00 m' Rp. 33,066.00 Rp. 2,116,224.00 64.00 33,066.00 2,116,224.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 2.00 bh Rp. 513,865.00 Rp. 1,027,730.00 2.00 513,865.00 1,027,730.00 TETAP
- Wastafel LW 643 J Inc. Acessories A.5.1.1 5. 2.00 bh Rp. 4,128,231.00 Rp. 8,256,462.00 2.00 4,128,231.00 8,256,462.00 TETAP
- Kran Wastafel TX109LD A.5.1.1 19. a 2.00 bh Rp. 1,168,915.00 Rp. 2,337,830.00 2.00 1,168,915.00 2,337,830.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 4.00 bh Rp. 343,915.00 Rp. 1,375,660.00 4.00 343,915.00 1,375,660.00 TETAP
- Urinoir U57M inc. acessories A.5.1.1 4. 2.00 bh Rp. 7,194,132.00 Rp. 14,388,264.00 2.00 7,194,132.00 14,388,264.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 5.00 bh Rp. 5,547,630.00 Rp. 27,738,150.00 5.00 5,547,630.00 27,738,150.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 5.00 bh Rp. 354,915.00 Rp. 1,774,575.00 5.00 354,915.00 1,774,575.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 5.00 bh Rp. 398,915.00 Rp. 1,994,575.00 5.00 398,915.00 1,994,575.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 5.00 bh Rp. 458,865.00 Rp. 2,294,325.00 5.00 458,865.00 2,294,325.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 5.00 bh Rp. 623,865.00 Rp. 3,119,325.00 5.00 623,865.00 3,119,325.00 TETAP
- Cermin Wastafel A.5.1.1 14.b 2.00 bh Rp. 2,768,865.00 Rp. 5,537,730.00 2.00 2,768,865.00 5,537,730.00 TETAP

- Pekerjaan Air Bersih Lantai 2


- Roof Tank Kapasitas 4 m3 FRP AT. 70 1.00 bh Rp. 14,286,470.00 Rp. 14,286,470.00 1.00 14,286,470.00 14,286,470.00 TETAP
- Pipa PVC AW dia 32 mm A.5.1.1 28. b 48.00 m' Rp. 58,509.00 Rp. 2,808,432.00 48.00 58,509.00 2,808,432.00 TETAP
- Pipa PVC AW dia 26 mm A.5.1.1 27. 31.00 m' Rp. 50,886.00 Rp. 1,577,466.00 31.00 50,886.00 1,577,466.00 TETAP
- Pipa PVC AW dia 22 mm A.5.1.1 27. b 64.00 m' Rp. 33,066.00 Rp. 2,116,224.00 64.00 33,066.00 2,116,224.00 TETAP
- Gate Valve Steel Dia 32 mm A.5.1.1 19. d 2.00 bh Rp. 513,865.00 Rp. 1,027,730.00 2.00 513,865.00 1,027,730.00 TETAP
- Wastafel LW 643 J Inc. Acessories A.5.1.1 5. 2.00 bh Rp. 4,128,231.00 Rp. 8,256,462.00 2.00 4,128,231.00 8,256,462.00 TETAP
- Kran Wastafel TX109LD A.5.1.1 19. a 2.00 bh Rp. 1,168,915.00 Rp. 2,337,830.00 2.00 1,168,915.00 2,337,830.00 TETAP
- Kran Air T23B13 A.5.1.1 19. 2.00 bh Rp. 343,915.00 Rp. 687,830.00 2.00 343,915.00 687,830.00 TETAP
- Urinoir U57M inc. acessories A.5.1.1 4. 2.00 bh Rp. 7,194,132.00 Rp. 14,388,264.00 2.00 7,194,132.00 14,388,264.00 TETAP
- Closed Duduk CW 637J/SW633JP Inc. acessories A.5.1.1.1. 5.00 bh Rp. 5,547,630.00 Rp. 27,738,150.00 5.00 5,547,630.00 27,738,150.00 TETAP
- Jet Shower THX20NB A.5.1.1 19. b 5.00 bh Rp. 354,915.00 Rp. 1,774,575.00 5.00 354,915.00 1,774,575.00 TETAP
- Stop Kran 2 way A.5.1.1 19. c 5.00 bh Rp. 398,915.00 Rp. 1,994,575.00 5.00 398,915.00 1,994,575.00 TETAP
- Floor Drain 4 Inchi TX1BN A.5.1.1 14. 5.00 bh Rp. 458,865.00 Rp. 2,294,325.00 5.00 458,865.00 2,294,325.00 TETAP
- Tissue Holder YH116 A.5.1.1 14.a 5.00 bh Rp. 623,865.00 Rp. 3,119,325.00 5.00 623,865.00 3,119,325.00 TETAP
- Cermin Wastafel A.5.1.1 14.b 2.00 bh Rp. 2,768,865.00 Rp. 5,537,730.00 2.00 2,768,865.00 5,537,730.00 TETAP

- Pekerjaan Air Bekas Lantai 1


- Pipa PVC AW dia 114 mm + Vent Inc. acessories A.5.1.1 32. a 61.00 m' Rp. 239,134.00 Rp. 14,587,174.00 61.00 239,134.00 14,587,174.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Pekerjaan Air Bekas Lantai 2


- Pipa PVC AW dia 114 mm + Vent Inc. acessories A.5.1.1 32. a 39.00 m' Rp. 239,134.00 Rp. 9,326,226.00 39.00 239,134.00 9,326,226.00 TETAP

27
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

- Clean Out Steel 4 Inchi A.5.1.1 14.c 1.00 bh Rp. 304,865.00 Rp. 304,865.00 1.00 304,865.00 304,865.00 TETAP

- Pekerjaan Air Kotor Lantai 1


- Biotech 4 kubik aerob anaerob Lengkap acessories dan pendukungnya AT. 72 1.00 set Rp. 23,526,470.00 Rp. 23,526,470.00 1.00 23,526,470.00 23,526,470.00 TETAP
- Pipa PVC AW dia 114 mm + Vent. Inc. acessories A.5.1.1 32. a 65.00 m' Rp. 239,134.00 Rp. 15,543,710.00 65.00 239,134.00 15,543,710.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c bh Rp. 304,865.00 Rp. - 0.00 304,865.00 - TETAP

- Pekerjaan Air Kotor Lantai 2


- Pipa PVC AW dia 114 mm + Vent. Inc. acessories A.5.1.1 32. a 4.00 m' Rp. 239,134.00 Rp. 956,536.00 4.00 239,134.00 956,536.00 TETAP
- Clean Out Steel 4 Inchi A.5.1.1 14.c 2.00 bh Rp. 304,865.00 Rp. 609,730.00 2.00 304,865.00 609,730.00 TETAP

- Test Commisioning
- Test Commisioning Harga Material 1.00 ls Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP

JUMLAH HARGA PEKERJAAN MEP Rp. 758,062,388.45 - - 758,062,388.45

TOTAL JUMLAH HARGA PEKERJAAN PARIWISATA Rp. 8,652,160,860.74 579,631,647.30 226,220,536.03 9,005,571,972.01

28
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PENDAHULUAN Rp 39,861,215.00

II PEKERJAAN STRUKTUR Rp 388,143,431.41

III PEKERJAAN ARSITEKTUR Rp 225,934,154.81

IV PEKERJAAN MEKANIKAL DAN ELEKTRIKAL Rp 18,864,092.50

V PEKERJAAN INSTALASI MEP MASTERPLAN Rp 2,519,649,494.20

JUMLAH Rp 3,192,452,387.92

29
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 40.00 m' Rp. 479,381.00 Rp. 19,175,240.00 40.00 479,381.00 19,175,240.00 TETAP
- Pekerjaan Pagar Proyek Harga Material 80.00 m' Rp. 85,500.00 Rp. 6,840,000.00 80.00 85,500.00 6,840,000.00 0.00 85,500.00 - BERKURANG

2 PEKERJAAN PEMATANGAN LAHAN


- Pekerjaan Penimbunan Tanah A.2.3.1.14. a 65.00 m3 Rp. 134,365.00 Rp. 8,733,725.00 50.00 134,365.00 6,718,250.00 115.00 134,365.00 15,451,975.00 BERTAMBAH
- Pekerjaan Pemadatan Tanah A.2.3.1.10. 65.00 m3 Rp. 78,650.00 Rp. 5,112,250.00 50.00 78,650.00 3,932,500.00 115.00 78,650.00 9,044,750.00 BERTAMBAH

JUmLAH HARGA PEKERJAAN PENDAHULUAN Rp. 39,861,215.00 10,650,750.00 6,840,000.00 43,671,965.00

II PEKERJAAN STRUKTUR
1 POER
Type P1 uk. 120x120X40 cm bh 12.00
- Galian tanah Pondasi Poer m3 Rp. 132,660.00 Rp. - 56.45 132,660.00 7,488,391.68 56.45 132,660.00 7,488,391.68 BERTAMBAH
- Lantai kerja m2 Rp. 1,378,547.00 Rp. - 1.73 1,378,547.00 2,382,129.22 1.73 1,378,547.00 2,382,129.22 BERTAMBAH
- Urugan kembali bekas galian m3 Rp. 39,325.00 Rp. - 47.04 39,325.00 1,849,848.00 47.04 39,325.00 1,849,848.00 BERTAMBAH
- Bekisting 2x pakai m2 Rp. 268,378.00 Rp. - 23.04 268,378.00 6,183,429.12 23.04 268,378.00 6,183,429.12 BERTAMBAH
- Pembesian (Besi Ulir) kg Rp. 19,868.20 Rp. - 1,590.62 19,868.20 31,602,835.76 1,590.62 19,868.20 31,602,835.76 BERTAMBAH
- Cor Beton K-275 m3 Rp. 1,406,067.00 Rp. - 6.91 1,406,067.00 9,718,735.10 6.91 1,406,067.00 9,718,735.10 BERTAMBAH

2 PEDESTAL KOLOM
Kolom K1 uk. 30x30
- Bekisting 2x pakai m2 Rp. 427,174.00 Rp. - 21.31 427,174.00 9,103,932.29 21.31 427,174.00 9,103,932.29 BERTAMBAH
- Pembesian (Besi Polos) kg Rp. 18,713.20 Rp. - 692.47 18,713.20 12,958,277.21 692.47 18,713.20 12,958,277.21 BERTAMBAH
- Cor Beton K-275 m3 Rp. 1,406,067.00 Rp. - 1.60 1,406,067.00 2,247,457.49 1.60 1,406,067.00 2,247,457.49 BERTAMBAH

3 PONDASI BATU KALI


- Type PB1 64.00 m'
- Galian tanah pondasi A.2.3.1.1. 30.72 m3 Rp. 108,075.00 Rp. 3,320,064.00 30.72 108,075.00 3,320,064.00 TETAP
- Urugan pasir bawah pondasi A.2.3.1.11. 3.84 m3 Rp. 571,230.00 Rp. 2,193,523.20 3.84 571,230.00 2,193,523.20 TETAP
- Pas. Batu kosong A.3.2.1.9. 7.68 m3 Rp. 824,802.00 Rp. 6,334,479.36 7.68 824,802.00 6,334,479.36 TETAP
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. 63.84 m3 Rp. 1,016,070.00 Rp. 64,865,908.80 63.84 1,016,070.00 64,865,908.80 TETAP
- Urugan tanah bekas galian A.2.3.1.9. 6.43 m3 Rp. 39,325.00 Rp. 252,938.40 6.43 39,325.00 252,938.40 TETAP

- Type PB2 m' 45.70


- Galian tanah pondasi A.2.3.1.1. m3 Rp. 108,075.00 Rp. 21.94 108,075.00 2,370,733.20 21.94 108,075.00 2,370,733.20 BERTAMBAH
- Urugan pasir bawah pondasi A.2.3.1.11. m3 Rp. 571,230.00 Rp. 2.74 571,230.00 1,566,312.66 2.74 571,230.00 1,566,312.66 BERTAMBAH
- Pas. Batu kosong A.3.2.1.9. m3 Rp. 824,802.00 Rp. 5.48 824,802.00 4,523,214.17 5.48 824,802.00 4,523,214.17 BERTAMBAH
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. m3 Rp. 1,016,070.00 Rp. 7.88 1,016,070.00 8,009,933.83 7.88 1,016,070.00 8,009,933.83 BERTAMBAH
- Urugan tanah bekas galian A.2.3.1.9. m3 Rp. 39,325.00 Rp. 21.94 39,325.00 862,633.20 21.94 39,325.00 862,633.20 BERTAMBAH

- Galian tanah Grountank A.2.3.1.1. 185.14 m3 Rp. 108,075.00 Rp. 20,008,573.20 185.136 108,075.00 20,008,573.20 0.00 108,075.00 - BERKURANG
- Urugan kembali A.2.3.1.9. 162.03 m3 Rp. 39,325.00 Rp. 6,371,908.40 162.032 39,325.00 6,371,908.40 0.00 39,325.00 - BERKURANG
- Urugan pasir A.2.3.1.11. 2.44 m3 Rp. 571,230.00 Rp. 1,391,516.28 2.436 571,230.00 1,391,516.28 0.00 571,230.00 - BERKURANG
Urugan Lantai kerja A.2.3.1.11. 4.87 m3 Rp. 571,230.00 Rp. 2,783,032.56 4.872 571,230.00 2,783,032.56 0.00 571,230.00 - BERKURANG

2 SLOEF
- Type S1 uk 25/40 64.00 m'
- Bekisting 2x pakai A.4.1.1.21 25.60 m2 Rp. 284,878.00 Rp. 7,292,876.80 25.60 284,878.00 7,292,876.80 BERTAMBAH
- Pembesian (Besi Polos) 149.93 kg/m3 A.4.1.1.17 959.57 kg Rp. 18,713.20 Rp. 17,956,623.83 303.80 18,713.20 5,685,092.69 1,263.37 18,713.20 23,641,716.51 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 6.40 m3 Rp. 1,406,067.00 Rp. 8,998,828.80 6.40 1,406,067.00 8,998,828.80 BERTAMBAH

3 PLAT LANTAI DASAR


Plat Beton T=10 cm (elev. +0.00)
- Pembesian wiremesh 2 Lapis M-8 1 m2 A.4.1.1.19 m2 Rp. 78,628.00 123.03 78,628.00 9,673,209.70 123.03 78,628.00 9,673,209.70 BERTAMBAH
- Cor Beton K-275 m3 Rp. 1,406,067.00 12.30 1,406,067.00 17,298,139.27 12.30 1,406,067.00 17,298,139.27 BERTAMBAH

4 KOLOM LT.1
- Kolom K1 uk. 30x30 4.94 12.00 bh
- Bekisting 2x pakai A.4.1.1.22 28.80 m2 Rp. 427,174.00 Rp. 12,302,611.20 28.80 427,174.00 12,302,611.20 TETAP
- Pembesian (Besi Polos) 206.05 kg/m3 A.4.1.1.17 890.13 kg Rp. 18,713.20 Rp. 16,657,131.31 1,354.20 18,713.20 25,341,397.48 2,244.33 18,713.20 41,998,528.79 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 4.32 m3 Rp. 1,406,067.00 Rp. 6,074,209.44 4.32 1,406,067.00 6,074,209.44 TETAP

5 BALOK
- Balok BK1 uk. 25x40 22.00 m'
- Bekisting 2x pakai A.4.1.1.23 6.05 m2 Rp. 440,374.00 Rp. 2,664,262.70 6.05 440,374.00 2,664,262.70 TETAP

30
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

- Pembesian (Besi Polos) 186.32 kg/m3 A.4.1.1.17 122.97 kg Rp. 18,713.20 Rp. 2,301,184.66 1,140.40 18,713.20 21,340,531.85 1,263.37 18,713.20 23,641,716.51 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 0.66 m3 Rp. 1,406,067.00 Rp. 928,004.22 0.66 1,406,067.00 928,004.22 TETAP

6 ATAP PLAT
- Atap Plat Beton T=12 cm (elev. +3.00)
- Bekisting Plat Lantai A.4.1.1.24 42.64 m2 Rp. 453,574.00 Rp. 19,340,395.36 42.64 453,574.00 19,340,395.36 TETAP
- Pembesian (Besi Polos) 153.44 kg/m3 A.4.1.1.17 785.12 kg Rp. 18,713.20 Rp. 14,692,141.12 1,464.72 18,713.20 27,409,558.19 2,249.84 18,713.20 42,101,699.31 BERTAMBAH
- Cor Beton K-275 A.4.1.1.9. 5.12 m3 Rp. 1,406,067.00 Rp. 7,194,563.63 5.12 1,406,067.00 7,194,563.63 TETAP
- Waterproofing SikaTop Seal AT. 06 85.28 m2 Rp. 59,763.00 Rp. 5,096,588.64 85.28 59,763.00 5,096,588.64 TETAP
- Waterproofing Membrane Bakar Membrane AT. 06 m2 Rp. 375,000.00 Rp. - 85.28 375,000.00 31,980,000.00 85.28 375,000.00 31,980,000.00 BERTAMBAH

7 BETON GROUNDTANK
- Bekisting 2x pakai A.4.1.1.24 144.48 m2 Rp. 453,574.00 Rp. 65,532,371.52 144.48 453,574.00 65,532,371.52 0.00 453,574.00 - BERKURANG
- Pembesian (Besi Polos) A.4.1.1.17 2,772.28 kg Rp. 18,713.20 Rp. 51,878,233.30 2,772.28 18,713.20 51,878,233.30 0.00 18,713.20 - BERKURANG
- Cor Beton K-275 Dinding A.4.1.1.9. 20.37 m3 Rp. 1,406,067.00 Rp. 28,638,772.66 20.37 1,406,067.00 28,638,772.66 0.00 1,406,067.00 - BERKURANG
- Beton lantai kerja K100 A.4.1.1.1 4.26 m3 Rp. 1,378,547.00 Rp. 5,878,124.41 4.26 1,378,547.00 5,878,124.41 0.00 1,378,547.00 - BERKURANG
- Cor Beton K-275 Plat A.4.1.1.9. 5.12 m3 Rp. 1,406,067.00 Rp. 7,194,563.63 5.12 1,406,067.00 7,194,563.63 0.00 1,406,067.00 - BERKURANG

JUMLAH HARGA PEKERJAAN STRUKTUR Rp. 388,143,431.41 239,595,792.09 189,677,095.95 438,062,127.56

III PEKERJAAN ARSITEKTUR


1 PEKERJAAN DINDING
- Pekerjaan Dinding
- Pas. Dinding Bata Ringan Bata Ringan T:10 cm A.4.4.1.26 200.00 m2 Rp. 184,283.00 Rp. 36,856,600.00 200.00 184,283.00 36,856,600.00 TETAP
- Plesteran campuran 1 : 4 Camp. 1:4 T 15mm A.4.4.2.4. 400.00 m2 Rp. 89,139.00 Rp. 35,655,600.00 400.00 89,139.00 35,655,600.00 TETAP
- Acian A.4.4.2.27. 400.00 m2 Rp. 50,985.00 Rp. 20,394,000.00 400.00 50,985.00 20,394,000.00 TETAP
- Pengecatan

2 PEKERJAAN LANTAI
- Pekerjaan Lantai
- Urugan pasir bawah lantai t = 10 cm A.2.3.1.11. 1.25 m3 Rp. 571,230.00 Rp. 716,322.42 1.25 571,230.00 716,322.42 TETAP
- Pekerjaan Lantai Kerja K100 A.4.1.1.1 0.61 m3 Rp. 1,378,547.00 Rp. 847,061.99 0.61 1,378,547.00 847,061.99 TETAP
- Pekerjaan Granit tile 60x60 (Polish) Terang A.4.4.3.10. 111.80 m2 Rp. 392,667.00 Rp. 43,900,170.60 111.80 392,667.00 43,900,170.60 TETAP

3 PEKERJAAN PINTU, JENDELA DAN ACCSESORIES


- Pekerjaan Pintu
- Pintu Type RPM P1 1x90 AT. 75 1.00 bh Rp. 7,247,141.00 Rp. 7,247,141.00 1.00 7,247,141.00 7,247,141.00 TETAP
Kusen Pintu Baja
Pintu Baja 2 mm Rangkap + Rangka
pengecatan Semprot
Kunci dan Handel
Engsel Pintu Baja

- Pintu Type RPM P2 2x90 AT. 76 1.00 bh Rp. 11,933,097.00 Rp. 11,933,097.00 1.00 11,933,097.00 11,933,097.00 TETAP
Kusen Pintu Baja
Pintu Baja 2 mm Rangkap + Rangka
pengecatan Semprot
Kunci dan Handel
Engsel Pintu Baja

- Pintu Type (P3) 320x250


Rolling door Aluminium + acc AT. 77 16.00 m2 Rp. 680,900.00 10,894,400.00 16.00 680,900.00 10,894,400.00 TETAP
-
5 PEKERJAAN PENGECATAN
- Pekerjaan Pengecatan
- Pek. Cat luar A.4.7.1.10. 684.20 m2 Rp. 57,629.00 Rp. 39,429,761.80 684.20 57,629.00 39,429,761.80 TETAP

6 PEKERJAAN LAIN-LAIN
-
- Tutup Manhole Harga Material 2.00 bh Rp. 2,700,000.00 Rp. 5,400,000.00 2.00 2,700,000.00 5,400,000.00 0.00 2,700,000.00 - BERKURANG
Tutup Kontrol Hole Harga Material 4.00 bh Rp. 2,200,000.00 Rp. 8,800,000.00 4.00 2,200,000.00 8,800,000.00 0.00 2,200,000.00 - BERKURANG
Exhaustfan Harga Material 3.00 bh Rp. 900,000.00 Rp. 2,700,000.00 3.00 900,000.00 2,700,000.00 BERKURANG
Tangga Monyet Harga Material 8.00 bh Rp. 145,000.00 Rp. 1,160,000.00 4.00 145,000.00 580,000.00 4.00 145,000.00 580,000.00 BERKURANG

JUMLAH HARGA PEKERJAAN ARSITEKTUR Rp. 225,934,154.81 - 14,780,000.00 211,154,154.81

IV PEKERJAAN MEP
1 PEKERJAAN LISTRIK
- Pek. Instalasi Penerangan & Stop Kontak Lantai 01
- Lampu RM TL led 2X9 Watt AT. 35 6.00 bh Rp. 581,166.67 Rp. 3,487,000.00 6.00 581,166.67 3,487,000.00 TETAP
- Lampu Downlight RD 150 LED 9 Watt AT. 32 6.00 bh Rp. 247,866.67 Rp. 1,487,200.00 6.00 247,866.67 1,487,200.00 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 2.00 bh Rp. 60,995.00 Rp. 121,990.00 2.00 60,995.00 121,990.00 TETAP
- Saklar tunggal AT. 41 5.00 bh Rp. 48,130.50 Rp. 240,652.50 5.00 48,130.50 240,652.50 TETAP
- Saklar ganda AT. 43 2.00 bh Rp. 75,350.00 Rp. 150,700.00 2.00 75,350.00 150,700.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 9.00 ttk Rp. 268,950.00 Rp. 2,420,550.00 9.00 268,950.00 2,420,550.00 TETAP

- Rak kabel / Tray Uk. 300x100 mm termasuk penggantung, supoort AT. 30 40.00 m' Rp. 273,900.00 Rp. 10,956,000.00 40.00 273,900.00 10,956,000.00 TETAP
dan accessories lainnya

31
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

JUMLAH HARGA PEKERJAAN MEP Rp. 18,864,092.50 - - 18,864,092.50

V PEKERJAAN INSTALASI MEP MASTERPLAN


1 PEKERJAAN ELEKTRIKAL
- Pek. Penyambungan Daya, Peralatan Utama dan Kabel-Kabel
Penyambungan Daya PLN 555KVA
- Penyambungan Daya PLN 555KVA Harga Material 555,000.00 VA Rp. 1,500.00 Rp. 832,500,000.00 555,000.00 1,500.00 832,500,000.00 0.00 1,500.00 - BERKURANG

Pengadaan Trafo Distribusi 630KVA


- Pengadaan Trafo Distribusi 630KVA Harga Material 1.00 Set Rp. 185,000,000.00 Rp. 185,000,000.00 1.00 185,000,000.00 185,000,000.00 0.00 185,000,000.00 - BERKURANG

- 20 KV-400V/231 V-Oil imersed lengkap dengan proteksi


standart,control ke

- Cubicle TM Oil, grounding system & material bantu Dilengkapi


dengan sertifikat uji pabrik & surat garansi pabrik

Kabel Tegangan Menengah 20KV


- Dari Kubikel PLN Ke Kubikel PH N2XSY 3X(1X70) mm2 Harga Material 7.00 m Rp. 1,150,000.00 Rp. 8,050,000.00 7.00 1,150,000.00 8,050,000.00 0.00 1,150,000.00 - BERKURANG
- Dari Kubikel PH Ke Trafo N2XSY 3X(1X70) mm2 Harga Material 8.00 m Rp. 1,200,000.00 Rp. 9,600,000.00 8.00 1,200,000.00 9,600,000.00 0.00 1,200,000.00 - BERKURANG
- Mof Kabel 3(1X70) Harga Material 4.00 Set Rp. 5,000,000.00 Rp. 20,000,000.00 4.00 5,000,000.00 20,000,000.00 0.00 5,000,000.00 - BERKURANG

Kabel Tegangan Menengah Rendah


- Dari Trafo ke Panel ATS/LVMDP NYY 3X(4X(1x240)) mm2 Harga Material 10.00 m Rp. 7,250,000.00 Rp. 72,500,000.00 10.00 0.00 7,250,000.00 - BERKURANG
- Dari Genset ke Panel ATS/LVMDP NYY 3X(4X(1x240)) mm3 Harga Material 12.00 m Rp. 7,262,679.60 Rp. 87,152,155.20 12.00 7,262,679.60 87,152,155.20 0.00 7,262,679.60 - BERKURANG
- Dari LVMDP ke panel SDP Pompa NYY 4x120 mm2 Harga Material 20.00 m Rp. 1,200,000.00 Rp. 24,000,000.00 20.00 1,200,000.00 24,000,000.00 0.00 1,200,000.00 - BERKURANG

- Dari SDP POMPA ke P Kontrol Hydrant Pump NYY 4x95 mm2 + Harga Material 10.00 m Rp. 1,140,000.00 Rp. 11,400,000.00 10.00 1,140,000.00 11,400,000.00 0.00 1,140,000.00 - BERKURANG
NYA 1x16 mm2

- Dari SDP POMPA ke P Kontrol Pompa Air Bersih 1 NYY 4x10 mm2 Harga Material 10.00 m Rp. 300,000.00 Rp. 3,000,000.00 10.00 300,000.00 3,000,000.00 0.00 300,000.00 - BERKURANG
+ NYA 1x6 mm3

- Dari SDP POMPA ke P Kontrol Pompa Air Bersih 2 NYY 4x10 mm2 Harga Material 10.00 m Rp. 300,000.00 Rp. 3,000,000.00 10.00 300,000.00 3,000,000.00 0.00 300,000.00 - BERKURANG
+ NYA 1x6 mm4

- Dari SDP POMPA ke P Kontrol Deep Well NYY 4x10mm2 + NYA Harga Material 10.00 m Rp. 300,000.00 Rp. 3,000,000.00 10.00 300,000.00 3,000,000.00 0.00 300,000.00 - BERKURANG
1x6 mm3

- Dari P. Kontrol Hydran Pump ke Electric Pump NYY 3(1 X 70) mm Harga Material 8.00 m Rp. 500,000.00 Rp. 4,000,000.00 8.00 500,000.00 4,000,000.00 0.00 500,000.00 - BERKURANG

- Dari P. Kontrol Hydran Pump ke Jockey NYY 3 X 10 mm2 Harga Material 8.00 m Rp. 75,000.00 Rp. 600,000.00 8.00 75,000.00 600,000.00 0.00 75,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 1 ke pompa 1 NYY 3x4 mm2 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 2 ke pompa 2 NYY 3x4 mm3 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 2 ke pompa 1 NYY 3x4 mm4 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari P. Kontrol Pompa Air Bersih 2 ke pompa 2 NYY 3x4 mm5 Harga Material 6.00 m Rp. 40,000.00 Rp. 240,000.00 6.00 40,000.00 240,000.00 0.00 40,000.00 - BERKURANG
- Dari Deep Well Ke Pompa Deep well NYY 3x4mm2 Harga Material 80.00 m Rp. 40,000.00 Rp. 3,200,000.00 80.00 40,000.00 3,200,000.00 0.00 40,000.00 - BERKURANG

2 PEKERJAAN PANEL
- Panel Tegangan Menengah 20KV
Incoming IM LBS 630A Include : Harga Material 1.00 Unit Rp. 63,500,000.00 Rp. 63,500,000.00 1.00 63,500,000.00 63,500,000.00 0.00 63,500,000.00 - BERKURANG
- Switch Cubicle 20KV
- Operating Mechanisem (Manual)
- Natural Interlock Earth-OFF-ON
- Earth Switch With SF6 Gas Tectology
- Voltage Indicator
- Busbar
- Heater

Outgoing QM LBS 630A Harga Material 1.00 bh Rp. 74,500,000.00 Rp. 74,500,000.00 1.00 74,500,000.00 74,500,000.00 0.00 74,500,000.00 - BERKURANG
- Switch Cubicle 20KV
- Operating Mechanisem (Manual)
- Natural Interlock Earth-OFF-ON
- Earth Switch With SF6 Gas Tectology
- Fuse 31,5A
- Voltage Indicator
- Busbar
- Heater

- Panel Tegangan Rendah


- Panel Automatic Transfer Switch (ATS) + LVMDP Harga Material 1.00 Unit Rp. 335,000,000.00 Rp. 335,000,000.00 1.00 335,000,000.00 335,000,000.00 0.00 335,000,000.00 - BERKURANG
- SDP Pompa Harga Material 1.00 Unit Rp. 19,500,000.00 Rp. 19,500,000.00 1 19,500,000.00 19,500,000.00 0.00 19,500,000.00 - BERKURANG
- Panel Kontrol Hydrant Pump include Soft Starter 90KW Harga Material 1.00 Unit Rp. 84,500,000.00 Rp. 84,500,000.00 1 84,500,000.00 84,500,000.00 0.00 84,500,000.00 - BERKURANG

Panel Kontrol Pompa Air Bersih Include WLC Panel diset Bekerja
- saling mendukung jika tekanan air rendah dalam beberapa detik Harga Material 2.00 Unit Rp. 34,500,000.00 Rp. 69,000,000.00 2 34,500,000.00 69,000,000.00 0.00 34,500,000.00 - BERKURANG
atau menit kedua pompa berjalan bersamaan

- Panel Kontrol Deep well Pump Include WLC Harga Material 1.00 Unit Rp. 9,000,000.00 Rp. 9,000,000.00 1 9,000,000.00 9,000,000.00 0.00 9,000,000.00 - BERKURANG
- Pentanahan Elektrikal MAX 2 OHM Harga Material 1.00 Titik Rp. 6,800,000.00 Rp. 6,800,000.00 1.00 6,800,000.00 6,800,000.00 0.00 6,800,000.00 - BERKURANG

3 PEKERJAAN INSTALASI PENERANGAN DAN STOP KONTAK


Instalasi Penerangan & Stop Kontak PH
- Lampu RMO TL led 2X9 Watt AT. 35 8.00 bh Rp. 581,166.67 Rp. 4,649,333.33 8.00 581,166.67 4,649,333.33 TETAP
- Lampu Downlight RD 150 LED 9 Watt Outdoor AT. 31 6.00 bh Rp. 247,866.67 Rp. 1,487,200.00 6.00 247,866.67 1,487,200.00 TETAP
- Stop kontak umum 16A, 1Ph AT. 44 8.00 bh Rp. 60,995.00 Rp. 487,960.00 8.00 60,995.00 487,960.00 TETAP

32
PERUBAHAN TERHADAP KONTRAK ADDENDUM
KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g) i j k l m n o p q

- Saklar tunggal AT. 41 14.00 bh Rp. 48,130.50 Rp. 673,827.00 14.00 48,130.50 673,827.00 TETAP
- Instalasi stop kontak (NYM 3X2,5 mm2 dalam conduit) AT. 46 8.00 Titik Rp. 268,950.00 Rp. 2,151,600.00 8.00 268,950.00 2,151,600.00 TETAP
- Instalasi titik lampu (NYM 3X2,5 mm2 dalam conduit) AT. 46 14.00 Titik Rp. 268,950.00 Rp. 3,765,300.00 14.00 268,950.00 3,765,300.00 TETAP

4 PEKERJAAN PENANGKAL PETIR DAN PENTANAHAN


- Pekerjaan Penangkal Petir
- Air Terminal, Radius Proteksi Minimal 120 Meter AT. 49 1.00 Unit Rp. 6,210,402.00 Rp. 6,210,402.00 1.00 6,210,402.00 6,210,402.00 TETAP
- Obstruction Light led 5 W AT. 51 1.00 bh Rp. 5,988,400.00 Rp. 5,988,400.00 1.00 5,988,400.00 5,988,400.00 TETAP
- Conductor Cable NYY 1x70 mm2 dalam pipa conduit AT. 50 60.00 m' Rp. 141,900.00 Rp. 8,514,000.00 60.00 141,900.00 8,514,000.00 TETAP
- Cable Clamp, Support & accesories & material bantu lain Harga Material 1.00 Ls Rp. 851,400.00 Rp. 851,400.00 1.00 851,400.00 851,400.00 TETAP
- Grounding max 2 ohm AT. 52 1.00 Titik Rp. 3,267,916.67 Rp. 3,267,916.67 1.00 3,267,916.67 3,267,916.67 TETAP
- Tiang Harga Material 1.00 Ls Rp. 1,300,000.00 Rp. 1,300,000.00 1.00 1,300,000.00 1,300,000.00 TETAP
- Perijinan Instansi Terkait Harga Material 1.00 Ls Rp. 4,500,000.00 Rp. 4,500,000.00 1.00 4,500,000.00 4,500,000.00 TETAP

- Pekerjaan Pentanahan
- Pentanahan Listrik Arus Kuat Harga Material 1.00 Ls Rp. 2,500,000.00 Rp. 2,500,000.00 1.00 2,500,000.00 2,500,000.00 TETAP
- Pentanahan Listrik Arus Lemah Harga Material 1.00 Ls Rp. 2,500,000.00 Rp. 2,500,000.00 1.00 2,500,000.00 2,500,000.00 TETAP

5 PEKERJAAN AIR BERSIH


- Pekerjaan Peralatan Utama
Pompa transfer (setiap Set Terdiri dari 2 Pompa) Harga Material 2.00 Set Rp. 130,000,000.00 Rp. 260,000,000.00 2.00 130,000,000.00 260,000,000.00 0.00 130,000,000.00 - BERKURANG
Terdiri dari 2 Pompa 5,5 kw 2900 rpm, 380V, 50 Hz, Pompa
Vertikal Multistage
Kapasitas : 10.000 Liter/Jam
Head : 125 Meter, Pipa : 1.5" x 1.5"
Panel diset Bekerja saling mendukung jika tekanan air rendah
dalam beberapa detik atau menit kedua pompa berjalan
bersamaan
Incude Pressure Tank dan aksesoris Lainnya

Pompa Deep Well Sumur Dalam Harga Material 1.00 Set Rp. 54,500,000.00 Rp. 54,500,000.00 1.00 54,500,000.00 54,500,000.00 0.00 54,500,000.00 - BERKURANG
Pompa deep well 4Kw/5.5HP 2900RPM 380V/3Phase
Kapsitas : 9 m3/jam
Hhead : 110 meter, Body : 4"

- Pekerjaan Instalasi Pipa HDPE

Pipa HDPE PN 16 dia 1,5" Include Aksesoris Dan pendukung Harga Material 1,120.00 Unit Rp. 127,000.00 Rp. 142,240,000.00 1,120.00 127,000.00 142,240,000.00 0.00 127,000.00 - BERKURANG
lainnya dan galian dan penutupan kemabli

Pipa Tegak ke Roof Tank PVC AW dia 3/4" Harga Material 165.00 m Rp. 20,000.00 Rp. 3,300,000.00 165.00 20,000.00 3,300,000.00 0.00 20,000.00 - BERKURANG

Pemasangan Panel Control WLC Pengengontrol Selenoide Valve Harga Material 19.00 bh Rp. 1,500,000.00 Rp. 28,500,000.00 19.00 1,500,000.00 28,500,000.00 0.00 1,500,000.00 - BERKURANG

Pemasangan Selenoid Valve 220VAC Harga Material 1.00 Set Rp. 2,500,000.00 Rp. 2,500,000.00 1.00 2,500,000.00 2,500,000.00 0.00 2,500,000.00 - BERKURANG
Selenoid Valve 220 VAC Steel 2 Buah Harga Material
Gate Valve 3/4 " Steel 6 buah Harga Material
Harga Material
- Pekerjaan Instalasi Pipa Sumur Dalam Harga Material
Pembuatan Sumur Dalam Harga Material 60.00 m Rp. 300,000.00 Rp. 18,000,000.00 60.00 300,000.00 18,000,000.00 0.00 300,000.00 - BERKURANG
Pipa Casing PVC AW Dia 6" Harga Material 60.00 m Rp. 305,000.00 Rp. 18,300,000.00 60.00 305,000.00 18,300,000.00 0.00 305,000.00 - BERKURANG
Pipa PVC AW Dia 2" Incude Aksesoris & pendukung lainnya Harga Material 70.00 m Rp. 60,000.00 Rp. 4,200,000.00 70.00 60,000.00 4,200,000.00 0.00 60,000.00 - BERKURANG

6 Test Comissioning
Test Comissioning Harga Material 1.00 Ls Rp. 9,500,000.00 Rp. 9,500,000.00 1.00 9,500,000.00 9,500,000.00 TETAP

JUMLAH HARGA PEKERJAAN MEP Rp. 2,519,649,494.20 - 2,388,802,155.20 58,347,339.00

TOTAL JUMLAH HARGA PEKERJAAN GENSET Rp. 3,192,452,387.92 250,246,542.09 2,600,099,251.15 770,099,678.87

33
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN PAGAR KAWASAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PENDAHULUAN Rp 47,938,100.00

II PEKERJAAN STRUKTUR Rp 658,997,567.14

III PEKERJAAN ARSITEKTUR Rp 1,113,335,533.63

JUMLAH Rp 1,820,271,200.76

34
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN PAGAR KAWASAN
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

PERUBAHAN TERHADAP KONTRAK ADDENDUM


KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA KETERANGAN

a b c d e f g h (e x g ) i j k l m n o p q

I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Sewa Pagar Keliling Kawasan BLK A.2.2.1.4. 100.00 m' Rp. 479,381.00 Rp. 47,938,100.00 100.00 479,381.00 47,938,100.00 TETAP
- Pekerjaan Bowplank m' Rp. 85,500.00 139.03 85,500.00 11,887,065.00 139.03 85,500.00 11,887,065.00 BERTAMBAH

JUmLAH HARGA PEKERJAAN PENDAHULUAN Rp. 47,938,100.00 11,887,065.00 - 59,825,165.00

II PEKERJAAN STRUKTUR PAGAR


1 PONDASI BATU KALI
Pondasi batu Kali Pagar Dinding
- Galian tanah pondasi A.2.3.1.1. m3 Rp. 108,075.00 Rp. - 1,244.26 108,075.00 134,473,556.35 1,244.26 108,075.00 134,473,556.35 BERTAMBAH
- Urugan pasir bawah pondasi A.2.3.1.11. m3 Rp. 571,230.00 Rp. - 78.24 571,230.00 44,692,451.86 78.24 571,230.00 44,692,451.86 BERTAMBAH
- Pas. Batu kosong A.3.2.1.9. m3 Rp. 824,802.00 Rp. - 234.76 824,802.00 193,629,145.38 234.76 824,802.00 193,629,145.38 BERTAMBAH
- Pas. Batu kali campuran 1 : 4 A.3.2.1.2. m3 Rp. 1,016,070.00 Rp. - 2,091.29 1,016,070.00 2,124,897,118.71 2,091.29 1,016,070.00 2,124,897,118.71 BERTAMBAH
- Urugan tanah bekas galian A.2.3.1.9. m3 Rp. 39,325.00 Rp. - 281.64 39,325.00 11,075,650.30 281.64 39,325.00 11,075,650.30 BERTAMBAH

2 SLOEF
- Type S1 uk 20/25 590.07 m' 451.04 139.03
- Bekisting 2x pakai A.4.1.1.21 147.52 m2 Rp. 284,878.00 Rp. 42,024,490.37 78.00 284,878.00 22,221,196.20 69.52 284,878.00 19,803,294.17 BERKURANG
- Pembesian (Besi Polos) 139.28 kg/m3 A.4.1.1.17 4,109.24 kg Rp. 18,713.20 Rp. 76,896,993.27 3,141.04 18,713.20 58,778,822.59 968.20 18,713.20 18,118,170.68 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 29.50 m3 Rp. 1,406,067.00 Rp. 41,483,897.73 22.55 1,406,067.00 31,709,622.98 6.95 1,406,067.00 9,774,274.75 BERKURANG

3 KOLOM
- Kolom K1 uk. 25x25 4.94 147.52 bh 112.69 34.83
- Bekisting 2x pakai A.4.1.1.22 309.79 m2 Rp. 427,174.00 Rp. 132,332,845.14 236.65 427,174.00 101,092,542.59 73.13 427,174.00 31,240,302.56 BERKURANG
- Pembesian (Besi Polos) 158.24 kg/m3 A.4.1.1.17 7,353.32 kg Rp. 18,713.20 Rp. 137,604,228.64 723.30 18,713.20 13,535,307.29 6,630.02 18,713.20 124,068,921.35 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 46.47 m3 Rp. 1,406,067.00 Rp. 65,337,138.93 41.90 1,406,067.00 58,910,314.25 4.57 1,406,067.00 6,426,824.68 BERKURANG

4 RING BALOK
- Ring Balok uk. 20x20 589.95 m' 138.85
- Bekisting 2x pakai A.4.1.1.23 176.99 m2 Rp. 440,374.00 Rp. 77,939,592.39 121.45 440,374.00 53,481,220.43 55.54 440,374.00 24,458,371.96 BERKURANG
- Pembesian (Besi Polos) 118.20 kg/m3 A.4.1.1.17 2,789.37 kg Rp. 18,713.20 Rp. 52,198,011.60 2,132.87 18,713.20 39,912,743.51 656.50 18,713.20 12,285,268.09 BERKURANG
- Cor Beton K-275 A.4.1.1.9. 23.60 m3 Rp. 1,406,067.00 Rp. 33,180,369.07 18.04 1,406,067.00 25,371,072.95 5.55 1,406,067.00 7,809,296.12 BERKURANG

JUMLAH HARGA PEKERJAAN STRUKTUR PAGAR Rp. 658,997,567.14 2,508,767,922.61 405,012,842.78 2,762,752,646.96

III PEKERJAAN ARSITEKTUR PAGAR


1 PEKERJAAN DINDING
- Pekerjaan Pagar Dinding
- Pas. Dinding Bata Ringan T.10 Bata Ringan T:10 cm A.4.4.1.26 973.42 m2 Rp. 184,283.00 Rp. 179,384,297.15 681.45 184,283.00 125,580,479.62 291.96 184,283.00 53,803,817.53 BERKURANG
- Plesteran campuran 1 : 4 Camp. 1:4 T 15mm A.4.4.2.4. 2,654.78 m2 Rp. 89,139.00 Rp. 236,643,988.73 2,070.85 89,139.00 184,593,409.01 583.93 89,139.00 52,050,579.71 BERKURANG
- Pek. Profil Kolom A.4.4.2.20.a 177.02 m' Rp. 87,670.00 Rp. 15,519,431.07 121.30 87,670.00 10,634,458.67 55.72 87,670.00 4,884,972.40 BERKURANG
- Acian A.4.4.2.27. 2,654.78 m2 Rp. 50,985.00 Rp. 135,353,703.38 2,070.85 50,985.00 105,582,236.27 583.93 50,985.00 29,771,467.11 BERKURANG
- Pek. Cat luar A.4.7.1.10. 2,654.78 m2 Rp. 57,629.00 Rp. 152,992,028.48 2,070.85 57,629.00 119,340,957.02 583.93 57,629.00 33,651,071.45 BERKURANG

2 PEKERJAAN PAGAR BRC


- Pekerjaan Pagar BRC
- Pek. Pondasi Beton K-275 A.4.1.1.9. 5.68 m3 Rp. 1,406,067.00 Rp. 7,992,084.83 5.68 1,406,067.00 7,992,084.83 0.00 1,406,067.00 - BERKURANG
- Pemasangan Tiang Pagar BRC Harga Material 406.00 bh Rp. 700,000.00 Rp. 284,200,000.00 406.00 700,000.00 284,200,000.00 0.00 700,000.00 - BERKURANG
- Pem. Pagar BRC 190x240 Harga Material 405.00 bh Rp. 250,000.00 Rp. 101,250,000.00 405.00 250,000.00 101,250,000.00 0.00 250,000.00 - BERKURANG

JUMLAH HARGA PEKERJAAN ARSITEKTUR PAGAR Rp. 1,113,335,533.63 - 939,173,625.42 174,161,908.21

JUMLAH HARGA PEKERJAAN PAGAR KAWASAN Rp. 1,820,271,200.76 2,520,654,987.61 1,344,186,468.20 2,996,739,720.17

35
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN NORMALISASI SEMPADAN SUNGAI
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PENDAHULUAN Rp 95,876,200.00

II PEKERJAAN NORMALISASI SEMPADAN SUNGAI Rp 3,923,988,061.95

JUMLAH Rp 4,019,864,261.95

36
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN NORMALISASI SEMPADAN SUNGAI
TAHUN ANGGARAN : APBN TA. 2021
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

PERUBAHAN TERHADAP KONTRAK ADDENDUM


KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q

I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 200.00 m' Rp. 479,381.00 Rp. 95,876,200.00 200.00 479,381.00 95,876,200.00 TETAP

JUMLAH HARGA PEKERJAAN PENDAHULUAN Rp. 95,876,200.00 - - 95,876,200.00

II PEKERJAAN NORMALISASI SEMPADAN SUNGAI


1 PEKERJAAN TIMBUNAN
- Timbunan Tanah
- Timbunan Tanah A.2.3.1.14. a 7,499.25 m3 Rp. 134,365.00 Rp. 1,007,636,726.25 7,499.25 134,365.00 1,007,636,726.25 TETAP

2 PEKERJAAN L SHAPE (RETAINING WALL)

- Pek. Pemasangan L Shape K 350 (Retaining Wall) L Shape 1500.1100.100 AT. 01a 499.95 unit Rp. 4,750,105.00 Rp. 2,374,814,994.75
499.95 4,750,105.00 2,374,814,994.75 TETAP

3 PEKERJAAN BRONJONG

- Pek. Pemasangan Bronjong Kawat 3mm (2x1x0.5) Bronjong Kawat 3mm AT. 01b 499.95 unit Rp. 1,083,181.00 Rp. 541,536,340.95
(2x1x0.5) 499.95 1,083,181.00 541,536,340.95 TETAP

JUMLAH HARGA PEKERJAAN JALAN DAN SALURAN Rp. 3,923,988,061.95 - - 3,923,988,061.95

JUMLAH HARGA PEKERJAAN SUNGAI Rp. 4,019,864,261.95 - - 4,019,864,261.95

37
REKAPITULASI BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

NO URAIAN PEKERJAAN JUMLAH

I PEKERJAAN PENDAHULUAN Rp 239,690,500.00

II PEKERJAAN DASAR JALAN, PARKIR DAN SALURAN Rp 1,415,302,668.71

JUMLAH Rp 1,654,993,168.71

38
CONTRACK CHANGE ORDER - 1 (CCO-1)
DAFTAR KUANTITAS DAN HARGA
KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU SULAWESI BARAT
PEKERJAAN : PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP 1)
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

PERUBAHAN TERHADAP KONTRAK ADDENDUM


KONTRAK AWAL
PEK. TAMBAH PEK. KURANG CCO - 1
NO URAIAN PEKERJAAN MEREK / UKURAN
KETERANGAN
KODE ANALISA VOLUME SAT. HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA VOLUME HARGA SATUAN JUMLAH HARGA
a b c d e f g h (e x g) i j k l m n o p q

I PEKERJAAN PENDAHULUAN
1 PEKERJAAN PERSIAPAN
- Pekerjaan Bowplank A.2.2.1.4. 500.00 m' Rp. 479,381.00 Rp. 239,690,500.00 500.00 479,381.00 239,690,500.00 TETAP

JUMLAH HARGA PEKERJAAN PENDAHULUAN Rp. 239,690,500.00 - - 239,690,500.00

II PEKERJAAN DASAR JALAN, PARKIR DAN SALURAN


1 PEKERJAAN JALAN
- Timbunan Tanah
- Timbunan Tanah A.2.3.1.14. a 4,105.96 m3 Rp. 134,365.00 Rp. 551,696,777.94 4,243.58 134,365.00 570,188,178.28 8,349.53 134,365.00 1,121,884,956.22 BERTAMBAH
- Timbunan Sirtu A.2.3.1.14. 1,094.92 m3 Rp. 237,325.00 Rp. 259,852,268.72 1,131.62 237,325.00 268,561,821.73 2,226.54 237,325.00 528,414,090.45 BERTAMBAH

2 PEKERJAAN SALURAN U DITCH DAN TUTUP U DITCH


- Pekerjaan dan Pemasangan Saluran U Ditch
- Pek. Galian tanah A.2.3.1.1. 167.33 m3 Rp. 108,075.00 Rp. 18,084,622.05 116.33 108,075.00 12,572,797.05 51.00 108,075.00 5,511,825.00 BERKURANG
- Pek. Pemasangan U Ditch K 350 40X40X120 CM AT. 65 557.78 buah Rp. 650,000.00 Rp. 362,557,000.00 415.78 650,000.00 270,257,000.00 142.00 650,000.00 92,300,000.00 BERKURANG
- Pek. Pemasangan Penutup U Ditch K 350 40X40X120 Tebal 10 Cm AT. 66 557.78 lbr Rp. 400,000.00 Rp. 223,112,000.00 415.78 400,000.00 166,312,000.00 142.00 400,000.00 56,800,000.00 BERKURANG

JUMLAH HARGA PEKERJAAN JALAN, SALURAN DAN PARKIR Rp. 1,415,302,668.71 838,750,000.01 449,141,797.05 1,804,910,871.67

JUMLAH HARGA PEKERJAAN JALAN Rp. 1,654,993,168.71 838,750,000.01 449,141,797.05 2,044,601,371.67

39
KONTRAKTOR PELAKSANA : PT MEGA BINTANG ABADI

NO. KONTRAK : SP. 03/PK/KPV/PPK.1/III/2022

TANGGAL KONTRAK : 24 Meret 2022

KONSULTAN PENGAWAS : PT. ARPHALA WIRATAMA CONSULTANT KSO CV. DUTA ENGINEERING CONSULTANT

REKAPITULASI CONTRACK CHANGE ORDER - 1 (CCO-1)


KEGIATAN : PEMBANGUNAN GEDUNG BLK KAB. MAMUJU, SULAWESI BARAT
PEKERJAAN : BLK KAB. MAMUJU SULAWESI BARAT
TAHUN ANGGARAN : APBN TA. 2022
LOKASI : BERU-BERU
KECAMATAN : KALUKKU
KABUPATEN : MAMUJU
PROVINSI : SULAWESI BARAT

PERUBAHAN TERHADAP KONTRAK


NO URAIAN PEKERJAAN KONTRAK AWAL CCO - 1 KETERANGAN
PEK. TAMBAH PEK. KURANG

I PEKERJAAN PENDAHULUAN 610,255,000.00 - - Rp 610,255,000.00 TETAP


II PEKERJAAN GERBANG UTAMA 1,356,876,437.91 30,042,348.00 26,982.47 Rp 1,386,891,803.44 BERTAMBAH
III PEKERJAAN GEDUNG KANTOR UTAMA 7,670,574,072.76 366,540,846.20 154,749,420.90 Rp 7,882,365,498.05 BERTAMBAH
IV PEKERJAAN WORKSHOP PARIWISATA DAN PERHOTELAN 8,652,160,860.74 579,631,647.30 226,220,536.03 Rp 9,005,571,972.01 BERTAMBAH
V PEKERJAAN POWER HOUSE , GENSET DAN POMPA (TAHAP 1) 3,192,452,387.92 250,246,542.09 2,600,099,251.15 Rp 770,099,678.87 BERKURANG
VI PEKERJAAN PAGAR KAWASAN 1,820,271,200.76 2,520,654,987.61 1,344,186,468.20 Rp 2,996,739,720.17 BERTAMBAH
VII PEKERJAAN NORMALISASI SEMPADAN SUNGAI 4,019,864,261.95 - - Rp 4,019,864,261.95 TETAP
VIII PEKERJAAN AKSES JALAN, PARKIR DAN SALURAN (TAHAP 1) 1,654,993,168.71 838,750,000.01 449,141,797.05 Rp 2,044,601,371.67 BERKURANG
JUMLAH (REKAPITULASI KESELURUHAN) 28,977,447,390.75 4,585,866,371 4,774,424,456 Rp 28,716,389,306.16
PPN 10 % 2,897,744,739.08

PPN 11% Rp 3,158,802,823.68

TOTAL 31,875,192,129.83 Rp 31,875,192,129.83


DIBULATKAN 31,875,192,129.00 Rp 31,875,192,129.00
Terbilang : #NAME?

Tangerang Selatan, 4 April 2022


Di Setujui Oleh : Diperiksa Oleh : Dibuat Oleh :
Direktorat Bina Kelembagaan Pelatihan Vokasi, Konsultan Pengawas Kontraktor Pelaksana
Ditjen Pembinaan Pelatihan Vokasi dan Produktivitas Kementerian Tenaga Kerja RI PT. ARPHALA WIRATAMA CONSULTANT KSO PT. MEGA BINTANG ABADI
Pejabat Pembuat Komitmen Direktorat Bina Kelembagaan Pelatihan Vokasi CV. DUTA KONSTRUKSI ENGINEERING CONSULTANT

AGUNG NUR ROHMAD HERMAN, ST., MT SUMARDI


NIP. 19760725 200501 1 001 Team Leader Direktur
NAMA PROYEK : PROYEK PEMBANGUNAN UPTP BLK MAMUJU
LOKASI : KALUKKU, Kab. MAMUJU
PELAKSANA KEGIATAN : PT. MEGA BINTANG ABADI
TANGGAL : 02 Maret 2022

REFF. GAMBAR TYPE Panjang Jumlah UNIT Jumlah Jumlah Sisa Sisa
NO. LOKASI NO. TUL TYPE D DIMENSION (m) Potongan Potongan JUMLAH WEIGHT WEIGHT Potongan Pembagi Pembagi Besi Potongan Total
a b c d Hook (m) pertitik TITIK (kg/m) (kg) (Buah) Besi utuh BTG (m) Pembagi (m) Btg Besi
A PILECAP GERBANG
1 Pilecap-1 P1 (100x100x25) P1 Tulangan Utama A 12 0.92 0.17 0.17 0.10 1.36 7.00 8 0.89 74.59 56.00 8.00 0.98 0.14 7.00
Tulangan Utama A 12 0.92 0.17 0.17 0.10 1.36 7.00 8 0.89 74.59 56.00 8.00 0.98 0.14 7.00
Tulangan Atas A 12 0.92 0.05 0.05 0.10 1.12 7.00 8 0.89 59.67 56.00 10.00 0.45 0.08 5.60
Tulangan Atas A 12 0.92 0.05 0.05 0.10 1.12 7.00 8 0.89 59.67 56.00 10.00 0.45 0.08 5.60
268.53
2 Pilecap-2 P2 (55x80x25) P2 Tulangan Utama A 12 0.72 0.17 0.17 0.10 1.16 5.00 7 0.89 37.30 35.00 10.00 0.14 0.04 3.50
Tulangan Utama A 12 0.47 0.17 0.17 0.10 0.91 4.00 7 0.89 22.95 28.00 13.00 0.03 0.01 2.15
Tulangan Atas A 12 0.72 0.05 0.05 0.10 0.92 5.00 7 0.89 28.69 35.00 13.00 0.01 0.00 2.69
Tulangan Atas A 12 0.47 0.05 0.05 0.10 0.67 4.00 7 0.89 17.55 28.00 17.00 0.06 0.04 1.65
106.49
3 PEDESTAL KOLOM Kolom (K1) 30 X 30 X 248 K1 Tulangan Utama A 16 2.48 0.25 0.40 0.30 0.10 3.53 8.00 8 1.58 403.97 64.00 3.00 10.03 0.47 21.33
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 17.00 8 0.62 100.69 136.00 10.00 8.16 0.60 13.60
504.66
Kolom K2 uk. 20x20 K2 Tulangan Utama A 12 2.48 0.25 0.40 0.30 0.10 3.53 4.00 8 0.89 113.66 32.00 3.00 5.01 0.47 10.67
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 17.00 8 0.62 62.93 136.00 16.00 1.36 0.16 8.50
176.60
SLOEF Type S1 uk 20/25 S1 Tulangan Utama A 12 2.24 0.07 0.10 2.41 10.00 1 0.89 26.64 10.00 4.00 1.48 0.59 2.50
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 15.00 1 0.62 11.11 15.00 10.00 0.90 0.60 1.50
Tulangan Utama A 12 2.00 0.07 0.10 2.17 10.00 3 0.89 79.92 30.00 4.00 6.23 0.83 7.50
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 14.00 3 0.62 31.10 42.00 10.00 2.52 0.60 4.20
Tulangan Utama A 12 2.20 0.07 0.10 2.37 10.00 2 0.89 53.28 20.00 4.00 3.15 0.63 5.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 15.00 2 0.62 22.21 30.00 10.00 1.80 0.60 3.00
224.25
Type S2 uk 15/20 S2 Tulangan Utama A 10 2.20 0.30 0.10 2.60 4.00 2 0.62 14.81 8.00 4.00 0.80 0.40 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 15.00 2 0.62 12.34 30.00 18.00 0.80 0.48 1.67
Tulangan Utama A 10 1.10 0.30 0.10 1.50 4.00 4 0.62 14.81 16.00 8.00 - - 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 4 0.62 13.16 32.00 18.00 0.85 0.48 1.78
Tulangan Utama A 10 1.20 0.30 0.10 1.60 4.00 3 0.62 12.69 12.00 7.00 0.20 0.11 1.71
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 3 0.62 9.87 24.00 18.00 0.64 0.48 1.33
Tulangan Utama A 10 1.64 0.30 0.10 2.04 4.00 5 0.62 29.62 20.00 5.00 1.44 0.36 4.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 11.00 5 0.62 22.62 55.00 18.00 1.47 0.48 3.06
Tulangan Utama A 10 1.40 0.30 0.10 1.80 4.00 1 0.62 4.94 4.00 6.00 0.13 0.20 0.67
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 10.00 1 0.62 4.11 10.00 18.00 0.27 0.48 0.56
138.97
KOLOM LT.1 Kolom K1 uk. 30x30 K1 Tulangan Utama A 16 7.50 0.30 0.10 7.90 8.00 4 1.58 605.95 32.00 1.00 131.20 4.10 32.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 50.00 4 0.62 148.08 200.00 10.00 12.00 0.60 20.00
Tulangan Utama A 16 3.50 0.30 0.10 3.90 8.00 4 1.58 201.98 32.00 3.00 1.07 0.10 10.67
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 24.00 4 0.62 71.08 96.00 10.00 5.76 0.60 9.60
1,027.09
Kolom K2 uk. 20x20 K2 Tulangan Utama A 12 7.00 0.15 0.40 0.10 7.65 4.00 1 0.89 42.62 4.00 1.00 17.40 4.35 4.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 47.00 1 0.62 21.75 47.00 16.00 0.47 0.16 2.94
Tulangan Utama A 12 6.40 0.15 0.40 0.10 7.05 4.00 1 0.89 42.62 4.00 1.00 19.80 4.95 4.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 43.00 1 0.62 19.90 43.00 16.00 0.43 0.16 2.69
Tulangan Utama A 12 5.80 0.15 0.40 0.10 6.45 4.00 1 0.89 42.62 4.00 1.00 22.20 5.55 4.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 39.00 1 0.62 18.05 39.00 16.00 0.39 0.16 2.44
Tulangan Utama A 12 5.20 0.15 0.40 0.10 5.85 4.00 1 0.89 21.31 4.00 2.00 0.30 0.15 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 35.00 1 0.62 16.20 35.00 16.00 0.35 0.16 2.19
Tulangan Utama A 12 4.60 0.15 0.40 0.10 5.25 4.00 1 0.89 21.31 4.00 2.00 1.50 0.75 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 31.00 1 0.62 14.35 31.00 16.00 0.31 0.16 1.94
Tulangan Utama A 12 4.00 0.15 0.40 0.10 4.65 4.00 1 0.89 21.31 4.00 2.00 2.70 1.35 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 27.00 1 0.62 12.49 27.00 16.00 0.27 0.16 1.69
Tulangan Utama A 12 3.40 0.15 0.40 0.10 4.05 4.00 1 0.89 21.31 4.00 2.00 3.90 1.95 2.00
Sengkang B 10 0.16 0.16 0.16 0.16 0.10 0.74 23.00 1 0.62 10.64 23.00 16.00 0.23 0.16 1.44
326.49
Kolom KP uk. 15x15 KP Tulangan Utama A 10 3.50 0.15 0.10 3.75 4.00 6 0.62 59.23 24.00 3.00 2.00 0.25 8.00
Sengkang B 10 0.11 0.11 0.11 0.11 0.10 0.54 24.00 6 0.62 48.46 144.00 22.00 0.79 0.12 6.55
Tulangan Utama A 10 7.50 0.15 0.10 7.75 4.00 2 0.62 59.23 8.00 1.00 34.00 4.25 8.00
Sengkang B 10 0.11 0.11 0.11 0.11 0.10 0.54 50.00 2 0.62 33.65 100.00 22.00 0.55 0.12 4.55
200.58
BALOK Balok B1 uk. 20x25 B1 Tulangan Utama A 12 2.24 0.30 0.10 2.64 10.00 1 0.89 26.64 10.00 4.00 0.90 0.36 2.50
Sengkang B 10 0.16 0.21 0.16 0.21 0.10 0.84 15.00 1 0.62 11.11 15.00 10.00 5.40 3.60 1.50
Tulangan Utama A 12 2.00 0.30 0.10 2.40 10.00 3 0.89 79.92 30.00 4.00 4.50 0.60 7.50
Sengkang B 10 0.16 0.21 0.16 0.21 0.10 0.84 14.00 3 0.62 31.10 42.00 10.00 15.12 3.60 4.20
Tulangan Utama A 12 2.20 0.30 0.10 2.60 10.00 2 0.89 53.28 20.00 4.00 2.00 0.40 5.00
Sengkang B 10 0.16 0.21 0.16 0.21 0.10 0.84 15.00 2 0.62 22.21 30.00 10.00 10.80 3.60 3.00
224.25
B2 Tulangan Utama A 10 2.20 0.30 0.10 2.60 4.00 2 0.62 14.81 8.00 4.00 0.80 0.40 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 15.00 2 0.62 12.34 30.00 18.00 0.80 0.48 1.67
Tulangan Utama A 10 1.10 0.30 0.10 1.50 4.00 4 0.62 14.81 16.00 8.00 - - 2.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 4 0.62 13.16 32.00 18.00 0.85 0.48 1.78
Tulangan Utama A 10 1.20 0.30 0.10 1.60 4.00 3 0.62 12.69 12.00 7.00 0.20 0.11 1.71
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 8.00 3 0.62 9.87 24.00 18.00 0.64 0.48 1.33
Tulangan Utama A 10 1.64 0.30 0.10 2.04 4.00 5 0.62 29.62 20.00 5.00 1.44 0.36 4.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 11.00 5 0.62 22.62 55.00 18.00 1.47 0.48 3.06
Tulangan Utama A 10 1.40 0.30 0.10 1.80 4.00 1 0.62 4.94 4.00 6.00 0.13 0.20 0.67
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 10.00 1 0.62 4.11 10.00 18.00 0.27 0.48 0.56
138.97
PLAT BETON Tulangan Atas V A 10 4.35 0.10 4.45 16.00 1 0.62 59.23 16.00 2.00 12.40 1.55 8.00
Tulangan Atas H A 10 2.40 0.10 2.50 29.00 1 0.62 53.68 29.00 4.00 3.63 0.50 7.25
Tulangan Bawah V A 10 4.35 0.10 4.45 16.00 1 0.62 59.23 16.00 2.00 12.40 1.55 8.00
Tulangan Bawah H A 10 2.40 0.10 2.50 29.00 1 0.62 53.68 29.00 4.00 3.63 0.50 7.25
225.82
KOLOM LT.2 Kolom K1 uk. 30x30 K1 Tulangan Utama A 16 4.00 0.30 0.10 4.40 8.00 4 1.58 302.98 32.00 2.00 25.60 1.60 16.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 27.00 4 0.62 79.96 108.00 10.00 6.48 0.60 10.80
382.94
RING BALOK Ring Balok uk. 15x20 RB2 Tulangan Utama A 10 9.60 0.30 0.10 10.00 4.00 1 0.62 29.62 4.00 1.00 8.00 2.00 4.00
Sengkang B 10 0.11 0.16 0.11 0.16 0.10 0.64 64.00 1 0.62 26.33 64.00 18.00 1.71 0.48 3.56
55.94

B PILECAP GEDUNG UTAMA


1 Pilecap-1 P1 (160x160x30) P1 Tulangan Utama A 16 1.52 0.22 0.22 0.20 2.16 10.00 40 1.58 1,514.88 400.00 5.00 19.20 0.24 80.00
Tulangan Utama A 16 1.52 0.22 0.22 0.20 2.16 10.00 40 1.58 1,514.88 400.00 5.00 19.20 0.24 80.00
Tulangan Atas A 16 1.52 0.30 0.30 0.20 2.32 10.00 40 1.58 1,262.40 400.00 6.00 (21.33) (0.32) 66.67
Tulangan Atas A 16 1.52 0.30 0.30 0.20 2.32 10.00 40 1.58 1,262.40 400.00 6.00 (21.33) (0.32) 66.67
5,554.56
2 PEDESTAL KOLOM Kolom K1 uk. 40x40 K1 Tulangan Utama A 16 2.40 0.25 0.40 0.30 0.10 3.45 8.00 40 1.58 2,019.84 320.00 3.00 58.67 0.55 106.67
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 16.00 40 0.62 473.86 640.00 10.00 38.40 0.60 64.00
2,493.70
3 SLOEF Type S1 uk 20/40 S1 Tulangan Utama A 13 5.00 0.35 0.30 0.10 5.75 6.00 37 1.04 1,385.28 222.00 2.00 27.75 0.25 111.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 34.00 37 0.62 931.42 1,258.00 10.00 75.48 0.60 125.80
Tulangan Utama A 13 3.00 0.35 0.30 0.10 3.75 6.00 20 1.04 499.20 120.00 3.00 10.00 0.25 40.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 20.00 20 0.62 296.16 400.00 10.00 24.00 0.60 40.00
Tulangan Utama A 13 4.00 0.35 0.30 0.10 4.75 6.00 8 1.04 299.52 48.00 2.00 30.00 1.25 24.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 27.00 8 0.62 159.93 216.00 10.00 12.96 0.60 21.60
Tulangan Utama A 13 1.50 0.35 0.30 0.10 2.25 6.00 4 1.04 74.88 24.00 4.00 4.50 0.75 6.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 10.00 4 0.62 29.62 40.00 10.00 2.40 0.60 4.00
Tulangan Utama A 13 3.75 0.35 0.30 0.10 4.50 6.00 2 1.04 74.88 12.00 2.00 9.00 1.50 6.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 25.00 2 0.62 37.02 50.00 10.00 3.00 0.60 5.00
Tulangan Utama A 13 1.25 0.35 0.30 0.10 2.00 6.00 2 1.04 24.96 12.00 6.00 - - 2.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 9.00 2 0.62 13.33 18.00 10.00 1.08 0.60 1.80
3,826.19
4 KOLOM LT.1 Kolom K1 uk. 40x40 K1 Tulangan Utama A 16 4.00 0.40 0.10 4.50 8.00 40 1.58 3,029.76 320.00 2.00 240.00 1.50 160.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 24.00 40 0.40 455.04 960.00 10.00 57.60 0.60 96.00
3,484.80
Kolom KP uk. 15x15 KP Tulangan Utama A 10 4.00 0.20 0.10 4.30 4.00 31 0.62 459.05 124.00 2.00 105.40 1.70 62.00
Sengkang B 8 0.14 0.14 0.14 0.14 0.10 0.66 24.00 31 0.40 195.92 744.00 18.00 4.96 0.12 41.33
654.97
5 BALOK Balok B1 uk. 25x40 B1 Tulangan Utama A 16 5.00 0.35 0.30 0.10 5.75 6.00 37 1.58 2,101.90 222.00 2.00 27.75 0.25 111.00
Tulangan Utama Tump. 16 1.55 0.30 0.10 1.95 1.00 37 1.58 116.77 37.00 6.00 0.31 0.05 6.17
Tulangan Peminggang B 10 5.00 0.30 0.10 5.40 2.00 37 0.62 273.95 74.00 2.00 22.20 0.60 37.00
Sengkang C 10 0.21 0.36 0.21 0.36 0.10 1.24 34.00 37 0.62 1,034.91 1,258.00 9.00 117.41 0.84 139.78
Tulangan Utama A 16 3.00 0.35 0.30 0.10 3.75 6.00 18 1.58 681.70 108.00 3.00 9.00 0.25 36.00
Tulangan Utama Tump. 16 1.55 0.30 0.10 1.95 1.00 18 1.58 56.81 18.00 6.00 0.15 0.05 3.00
Tulangan Peminggang B 10 3.00 0.30 0.10 3.40 2.00 18 0.62 88.85 36.00 3.00 7.20 0.60 12.00
Sengkang C 10 0.21 0.36 0.21 0.36 0.10 1.24 20.00 18 0.62 296.16 360.00 9.00 33.60 0.84 40.00
Tulangan Utama A 16 4.00 0.35 0.30 0.10 4.75 6.00 7 1.58 397.66 42.00 2.00 26.25 1.25 21.00
Tulangan Utama Tump. 16 1.55 0.30 0.10 1.95 1.00 7 1.58 22.09 7.00 6.00 0.06 0.05 1.17
Tulangan Peminggang B 10 3.00 0.30 0.10 3.40 2.00 7 0.62 34.55 14.00 3.00 2.80 0.60 4.67
Sengkang C 10 0.21 0.36 0.21 0.36 0.10 1.24 27.00 7 0.62 155.48 189.00 9.00 17.64 0.84 21.00
5,260.83
Balok B1 uk. 20x30 B2 Tulangan Utama A 13 5.00 0.09 0.30 0.10 5.49 4.00 16 1.04 399.36 64.00 2.00 16.32 0.51 32.00
Sengkang B 10 0.16 0.26 0.16 0.26 0.10 0.94 34.00 16 0.62 335.65 544.00 12.00 32.64 0.72 45.33
Tulangan Utama A 13 3.00 0.09 0.30 0.10 3.49 4.00 7 1.58 176.74 28.00 3.00 4.76 0.51 9.33
Sengkang B 10 0.16 0.26 0.16 0.26 0.10 0.94 20.00 7 1.04 145.60 140.00 12.00 8.40 0.72 11.67
Tulangan Utama A 13 4.00 0.09 0.30 0.10 4.49 4.00 4 1.04 99.84 16.00 2.00 12.08 1.51 8.00
Sengkang B 10 0.16 0.26 0.16 0.26 0.10 0.94 27.00 4 1.58 170.42 108.00 12.00 6.48 0.72 9.00
1,327.61
Balok B1 uk. 15x20 B3 Tulangan Utama A 10 3.00 0.20 0.10 3.30 4.00 3 0.62 29.62 12.00 3.00 2.80 0.70 4.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 20.00 3 0.40 15.80 60.00 18.00 1.60 0.48 3.33
Tulangan Utama A 10 3.25 0.20 0.10 3.55 4.00 2 0.62 19.74 8.00 3.00 1.20 0.45 2.67
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 22.00 2 0.40 11.59 44.00 18.00 1.17 0.48 2.44
Tulangan Utama A 10 4.00 0.20 0.10 4.30 4.00 1 0.62 14.81 4.00 2.00 3.40 1.70 2.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 27.00 1 0.40 7.11 27.00 18.00 0.72 0.48 1.50
Tulangan Utama A 10 1.25 0.20 0.10 1.55 4.00 4 0.62 19.74 16.00 6.00 1.20 0.45 2.67
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 9.00 4 0.40 9.48 36.00 18.00 0.96 0.48 2.00
Tulangan Utama A 10 3.25 0.20 0.10 3.55 4.00 2 0.62 19.74 8.00 3.00 1.20 0.45 2.67
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 22.00 2 0.40 11.59 44.00 18.00 1.17 0.48 2.44
159.22
KOLOM LT.2 Kolom K1 uk. 40x40 K1 Tulangan Utama A 16 4.00 0.40 0.10 4.50 8.00 40 1.58 3,029.76 320.00 2.00 240.00 1.50 160.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 24.00 40 0.62 710.78 960.00 10.00 57.60 0.60 96.00
3,740.54
Kolom KP uk. 15x15 KP Tulangan Utama A 10 4.00 0.20 0.10 4.30 4.00 31 0.62 459.05 124.00 2.00 105.40 1.70 62.00
Sengkang B 8 0.14 0.14 0.14 0.14 0.10 0.66 24.00 31 0.40 195.92 744.00 18.00 4.96 0.12 41.33
654.97
RING BALOK LT.2 Ring Balok uk 20/40 B4 Tulangan Utama A 10 5.00 0.10 0.10 5.20 5.00 37 0.62 684.87 185.00 2.00 74.00 0.80 92.50
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 25.00 37 0.62 684.87 925.00 10.00 55.50 0.60 92.50
Tulangan Utama A 10 3.00 0.10 0.10 3.20 5.00 20 0.62 246.80 100.00 3.00 26.67 0.80 33.33
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 15.00 20 0.62 222.12 300.00 10.00 18.00 0.60 30.00
Tulangan Utama A 10 4.00 0.10 0.10 4.20 5.00 8 0.62 148.08 40.00 2.00 36.00 1.80 20.00
Sengkang B 10 0.16 0.36 0.16 0.36 0.10 1.14 20.00 8 0.62 118.46 160.00 10.00 9.60 0.60 16.00
2,105.20
Ring Balok uk 15/20 B4 Tulangan Utama A 10 5.00 0.10 0.10 5.20 5.00 14 0.62 259.14 70.00 2.00 28.00 0.80 35.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 25.00 14 0.40 92.17 350.00 18.00 9.33 0.48 19.44
Tulangan Utama A 10 3.00 0.10 0.10 3.20 5.00 6 0.62 74.04 30.00 3.00 8.00 0.80 10.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 15.00 6 0.40 23.70 90.00 18.00 2.40 0.48 5.00
Tulangan Utama A 10 4.00 0.10 0.10 4.20 5.00 4 0.40 47.40 20.00 2.00 18.00 1.80 10.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 20.00 4 0.40 21.07 80.00 18.00 2.13 0.48 4.44
Tulangan Utama A 10 3.25 0.10 0.10 3.45 5.00 2 0.40 15.80 10.00 3.00 1.83 0.55 3.33
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 20.00 2 0.40 10.53 40.00 18.00 1.07 0.48 2.22
Tulangan Utama A 10 1.50 0.10 0.10 1.70 5.00 2 0.40 7.90 10.00 6.00 0.50 0.30 1.67
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 8.00 2 0.40 4.21 16.00 18.00 0.43 0.48 0.89
Tulangan Utama A 10 1.25 0.10 0.10 1.45 5.00 4 0.40 15.80 20.00 6.00 1.83 0.55 3.33
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 7.00 4 0.40 7.37 28.00 18.00 0.75 0.48 1.56
579.13
C WORKSHOP PARIWISATA DAN PERHOTELAN

1 Pilecap-1 P1 (160x160x30) P1 Tulangan Utama A 16 1.52 0.22 0.22 0.10 2.06 10.00 27 1.58 1,022.54 270.00 5.00 18.36 0.34 54.00
Tulangan Utama A 16 1.52 0.22 0.22 0.10 2.06 10.00 27 1.58 1,022.54 270.00 5.00 18.36 0.34 54.00
Tulangan Atas A 16 1.52 0.10 0.10 0.10 1.82 10.00 27 1.58 852.12 270.00 6.00 8.10 0.18 45.00
Tulangan Atas A 16 1.52 0.10 0.10 0.10 1.82 10.00 27 1.58 852.12 270.00 6.00 8.10 0.18 45.00
3,749.33
2 PEDESTAL KOLOM Kolom K1 uk. 60x60 K1 Tulangan Utama A 16 2.50 0.46 0.53 0.38 0.10 3.97 10.00 27 1.58 1,704.24 270.00 3.00 2.70 0.03 90.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 14.00 27 0.62 279.87 378.00 10.00 22.68 0.60 37.80
1,984.11
3 SLOEF Type S1 uk 35/75 S1 Tulangan Utama A 16 8.00 0.56 0.30 0.10 8.96 9.00 16 1.58 2,726.78 144.00 1.00 437.76 3.04 144.00
Tulangan Peminggang B 10 8.00 0.30 0.10 8.40 2.00 16 0.62 236.93 32.00 1.00 115.20 3.60 32.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 54.00 16 0.62 1,279.41 864.00 5.00 224.64 1.30 172.80
Tulangan Utama A 16 6.00 0.56 0.30 0.10 6.96 9.00 11 1.58 1,874.66 99.00 1.00 498.96 5.04 99.00
Tulangan Peminggang B 10 6.00 0.30 0.10 6.40 2.00 11 0.62 162.89 22.00 1.00 123.20 5.60 22.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 40.00 11 0.62 651.55 440.00 5.00 114.40 1.30 88.00
Tulangan Utama A 16 5.00 0.56 0.30 0.10 5.96 9.00 8 1.58 681.70 72.00 2.00 1.44 0.04 36.00
Tulangan Peminggang B 10 5.00 0.30 0.10 5.40 2.00 8 0.62 59.23 16.00 2.00 4.80 0.60 8.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 34.00 8 0.62 402.78 272.00 5.00 70.72 1.30 54.40
Tulangan Utama A 16 4.00 0.56 0.30 0.10 4.96 9.00 6 1.58 511.27 54.00 2.00 28.08 1.04 27.00
Tulangan Peminggang B 10 4.00 0.30 0.10 4.40 2.00 6 0.62 44.42 12.00 2.00 9.60 1.60 6.00
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 27.00 6 0.62 239.89 162.00 5.00 42.12 1.30 32.40
Tulangan Utama A 16 2.00 0.56 0.30 0.10 2.96 9.00 5 1.58 213.03 45.00 4.00 0.45 0.04 11.25
Tulangan Peminggang B 10 2.00 0.30 0.10 2.40 2.00 5 0.62 18.51 10.00 4.00 1.50 0.60 2.50
Sengkang C 10 0.31 0.71 0.31 0.71 0.10 2.14 14.00 5 0.62 103.66 70.00 5.00 18.20 1.30 14.00
9,206.71
Type S1 uk 25/50 S2 Tulangan Utama A 10 8.00 0.30 0.10 8.40 5.00 2 0.62 74.04 10.00 1.00 36.00 3.60 10.00
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 46.00 2 0.62 85.15 92.00 8.00 5.52 0.48 11.50
Tulangan Utama A 10 4.00 0.30 0.10 4.40 5.00 5 0.62 92.55 25.00 2.00 20.00 1.60 12.50
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 23.00 5 0.62 106.43 115.00 8.00 6.90 0.48 14.38
Tulangan Utama A 10 3.00 0.30 0.10 3.40 5.00 1 0.62 12.34 5.00 3.00 1.00 0.60 1.67
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 17.00 1 0.62 15.73 17.00 8.00 1.02 0.48 2.13
Tulangan Utama A 10 1.20 0.30 0.10 1.60 5.00 2 0.62 10.58 10.00 7.00 0.16 0.11 1.43
Sengkang B 10 0.21 0.46 0.21 0.46 0.10 1.44 6.00 2 0.62 11.11 12.00 8.00 0.72 0.48 1.50
407.93
4 KOLOM LT.1 Kolom K1 uk. 60x60 K1 Tulangan Utama A 19 4.00 0.40 0.49 0.10 4.99 16.00 27 2.22 5,762.02 432.00 2.00 218.16 1.01 216.00
Tulangan Utama Stek A 19 1.00 0.49 0.10 1.59 16.00 27 2.22 1,646.29 432.00 7.00 7.67 0.12 61.71
Sengkang B 13 0.56 0.56 0.56 0.56 0.10 2.34 24.00 27 1.04 1,617.41 648.00 5.00 38.88 0.30 129.60
9,025.71
Kolom KP uk. 15x15 KP Tulangan Utama A 10 4.00 0.20 0.10 4.30 4.00 23 1.04 574.08 92.00 2.00 78.20 1.70 46.00
Sengkang B 8 0.14 0.14 0.14 0.14 0.10 0.66 24.00 23 0.40 145.36 552.00 18.00 3.68 0.12 30.67
719.44
5 BALOK Balok B1 uk. 40x70 B1 (8Mtr) Tulangan Utama A 19 8.00 0.52 0.30 0.10 8.92 6.00 14 2.22 2,240.78 84.00 1.00 258.72 3.08 84.00
Tulangan Utama Tump. 19 2.00 0.56 0.30 0.10 2.96 3.00 14 2.22 280.10 42.00 4.00 0.42 0.04 10.50
Tulangan Utama Lap. B 19 4.04 0.56 0.30 0.10 5.00 5.00 14 2.22 1,867.32 70.00 1.00 490.00 7.00 70.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 48.00 14 1.04 1,677.31 672.00 5.00 174.72 1.30 134.40

B1 (6Mtr) Tulangan Utama A 19 6.00 0.52 0.30 0.10 6.92 6.00 9 2.22 1,440.50 54.00 1.00 274.32 5.08 54.00
Tulangan Utama Tump. 19 1.50 0.56 0.30 0.10 2.46 3.00 9 2.22 180.06 27.00 4.00 3.65 0.54 6.75
Tulangan Utama Lap. B 19 3.00 0.56 0.30 0.10 3.96 5.00 9 2.22 400.14 45.00 3.00 0.60 0.04 15.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 34.00 9 1.04 763.78 306.00 5.00 79.56 1.30 61.20

B1 (5Mtr) Tulangan Utama A 19 5.00 0.52 0.30 0.10 5.92 6.00 7 2.22 1,120.39 42.00 1.00 255.36 6.08 42.00
Tulangan Utama Tump. 19 1.25 0.56 0.30 0.10 2.21 3.00 7 2.22 112.04 21.00 5.00 0.80 0.19 4.20
Tulangan Utama Lap. B 19 2.50 0.56 0.30 0.10 3.46 5.00 7 2.22 311.22 35.00 3.00 6.30 0.54 11.67
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 7 1.04 489.22 196.00 5.00 50.96 1.30 39.20

B1 (4Mtr) Tulangan Utama A 19 4.00 0.52 0.30 0.10 4.92 6.00 6 2.23 963.36 36.00 1.00 254.88 7.08 36.00
Tulangan Utama Tump. 19 1.00 0.56 0.30 0.10 1.96 3.00 6 2.23 96.34 18.00 5.00 1.58 0.44 3.60
Tulangan Utama Lap. B 19 2.00 0.56 0.30 0.10 2.96 5.00 6 2.23 267.60 30.00 3.00 10.40 1.04 10.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 6 1.04 419.33 168.00 5.00 43.68 1.30 33.60

B1 (2Mtr) Tulangan Utama A 19 2.00 0.52 0.30 0.10 2.92 6.00 5 2.23 200.70 30.00 4.00 0.60 0.08 7.50
Tulangan Utama Tump. 19 0.50 0.56 0.30 0.10 1.46 3.00 5 2.23 50.18 15.00 8.00 0.07 0.04 1.88
Tulangan Utama Lap. B 19 1.00 0.56 0.30 0.10 1.96 5.00 5 2.23 111.50 25.00 6.00 0.17 0.04 4.17
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 5 1.04 349.44 140.00 5.00 36.40 1.30 28.00

B1 (3Mtr) Tulangan Utama A 19 3.00 0.52 0.30 0.10 3.92 6.00 3 2.23 160.56 18.00 3.00 0.48 0.08 6.00
Tulangan Utama Tump. 19 0.85 0.56 0.30 0.10 1.81 3.00 3 2.23 40.14 9.00 6.00 0.29 0.19 1.50
Tulangan Utama Lap. B 19 2.25 0.56 0.30 0.10 3.21 5.00 3 2.23 133.80 15.00 3.00 3.95 0.79 5.00
Sengkang C 13 0.36 0.66 0.36 0.66 0.10 2.14 28.00 3 1.04 209.66 84.00 5.00 21.84 1.30 16.80
13,885.47
Balok Anak B2 uk. 30x50 B2 (8Mtr) Tulangan Utama A 19 8.00 0.52 0.30 0.10 8.92 6.00 11 2.23 1,766.16 66.00 1.00 203.28 3.08 66.00
Tulangan Utama Tump. 19 2.00 0.56 0.30 0.10 2.96 2.00 11 2.23 147.18 22.00 4.00 0.22 0.04 5.50
Tulangan Utama Lap. B 19 4.04 0.56 0.30 0.10 5.00 3.00 11 2.23 441.54 33.00 2.00 16.50 1.00 16.50
Tulangan Peminggang C 13 8.00 0.30 0.10 8.40 2.00 11 2.23 588.72 22.00 1.00 79.20 3.60 22.00
Sengkang D 13 0.26 0.46 0.26 0.46 0.10 1.54 48.00 11 1.04 941.35 528.00 7.00 92.02 1.22 75.43

B2 (6Mtr) Tulangan Utama A 19 6.00 0.52 0.30 0.10 6.92 6.00 10 2.23 1,605.60 60.00 1.00 304.80 5.08 60.00
Tulangan Utama Tump. 19 1.00 0.56 0.30 0.10 1.96 2.00 10 2.23 89.20 20.00 6.00 0.13 0.04 3.33
Tulangan Utama Lap. B 19 2.00 0.56 0.30 0.10 2.96 3.00 10 2.23 200.70 30.00 4.00 0.30 0.04 7.50
Tulangan Peminggang C 13 6.00 0.30 0.10 6.40 2.00 10 2.23 535.20 20.00 1.00 112.00 5.60 20.00
Sengkang D 13 0.26 0.46 0.26 0.46 0.10 1.54 36.00 10 1.04 641.83 360.00 7.00 62.74 1.22 51.43

B2 (4Mtr) Tulangan Utama A 19 4.00 0.52 0.30 0.10 4.92 6.00 4 2.23 321.12 24.00 2.00 12.96 1.08 12.00
Tulangan Utama Tump. 19 0.85 0.56 0.30 0.10 1.81 2.00 4 2.23 35.68 8.00 6.00 0.25 0.19 1.33
Tulangan Utama Lap. B 19 1.60 0.56 0.30 0.10 2.56 3.00 4 2.23 80.28 12.00 4.00 1.32 0.44 3.00
Tulangan Peminggang C 13 4.00 0.30 0.10 4.40 2.00 4 2.23 107.04 8.00 2.00 6.40 1.60 4.00
Sengkang D 13 0.26 0.46 0.26 0.46 0.10 1.54 36.00 4 1.04 256.73 144.00 7.00 25.10 1.22 20.57
7,758.33
Balok Anak B3 uk. 15x20 B3 (4Mtr) Tulangan Utama A 10 4.00 0.10 0.10 4.20 5.00 2 0.62 37.02 10.00 2.00 9.00 1.80 5.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 20.00 2 0.40 10.53 40.00 18.00 1.07 0.48 2.22

B3 (3Mtr) Tulangan Utama A 10 3.00 0.10 0.10 3.20 5.00 2 0.62 24.68 10.00 3.00 2.67 0.80 3.33
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 20.00 2 0.40 10.53 40.00 18.00 1.07 0.48 2.22
82.77
KOLOM LT.2 Kolom K1 uk. 60x60 K1 Tulangan Utama A 19 4.00 0.40 0.49 0.10 4.99 16.00 27 2.22 5,762.02 432.00 2.00 218.16 1.01 216.00
Tulangan Utama Stek A 19 1.00 0.49 0.10 1.59 16.00 27 2.22 1,646.29 432.00 7.00 7.67 0.12 61.71
Sengkang B 13 0.56 0.56 0.56 0.56 0.10 2.34 24.00 27 1.04 1,617.41 648.00 5.00 38.88 0.30 129.60
9,025.71
Kolom KP uk. 15x15 KP Tulangan Utama A 10 4.00 0.20 0.10 4.30 4.00 23 0.62 340.58 92.00 2.00 78.20 1.70 46.00
Sengkang B 8 0.14 0.14 0.14 0.14 0.10 0.66 24.00 23 0.40 145.36 552.00 18.00 3.68 0.12 30.67
485.94
RING BALOK Ring Balok uk. 30x65 RB1 (8Mtr) Tulangan Utama A 16 8.00 0.40 0.10 8.50 7.00 14 1.58 1,855.73 98.00 1.00 343.00 3.50 98.00
Tulangan Peminggang B 10 8.00 0.20 0.10 8.30 2.00 14 0.62 207.31 28.00 1.00 103.60 3.70 28.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 14 0.62 777.42 840.00 8.00 8.40 0.08 105.00

RB1 (6Mtr) Tulangan Utama A 16 6.00 0.40 0.10 6.50 7.00 9 3.85 2,912.87 63.00 1.00 346.50 5.50 63.00
Tulangan Peminggang B 10 6.00 0.20 0.10 6.30 2.00 9 0.62 133.27 18.00 1.00 102.60 5.70 18.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 9 0.62 499.77 540.00 8.00 5.40 0.08 67.50

RB1 (5Mtr) Tulangan Utama A 16 5.00 0.40 0.10 5.50 7.00 7 7.99 2,349.06 49.00 2.00 12.25 0.50 24.50
Tulangan Peminggang B 10 5.00 0.20 0.10 5.30 2.00 7 0.62 51.83 14.00 2.00 4.90 0.70 7.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 7 0.62 388.71 420.00 8.00 4.20 0.08 52.50

RB1 (4Mtr) Tulangan Utama A 16 4.00 0.40 0.10 4.50 7.00 4 0.62 104.16 28.00 2.00 21.00 1.50 14.00
Tulangan Peminggang B 10 4.00 0.20 0.10 4.30 2.00 4 0.62 29.62 8.00 2.00 6.80 1.70 4.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 4 0.62 222.12 240.00 8.00 2.40 0.08 30.00

RB1 (2Mtr) Tulangan Utama A 16 2.00 0.40 0.10 2.50 7.00 6 1.58 199.08 42.00 4.00 5.25 0.50 10.50
Tulangan Peminggang B 10 2.00 0.20 0.10 2.30 2.00 6 0.62 22.21 12.00 4.00 2.10 0.70 3.00
Sengkang C 10 0.26 0.61 0.26 0.26 0.10 1.49 60.00 6 0.62 333.18 360.00 8.00 3.60 0.08 45.00
10,086.34
Ring Balok uk. 25x50 RB2 (8Mtr) Tulangan Utama A 16 8.00 0.40 0.10 8.50 7.00 8 1.58 1,061.76 56.00 1.00 196.00 3.50 56.00
Tulangan Peminggang B 10 8.00 0.20 0.10 8.30 2.00 8 0.62 118.46 16.00 1.00 59.20 3.70 16.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 8 0.62 444.24 480.00 8.00 28.80 0.48 60.00

RB2 (6Mtr) Tulangan Utama A 16 6.00 0.40 0.10 6.50 7.00 2 1.58 265.44 14.00 1.00 77.00 5.50 14.00
Tulangan Peminggang B 10 6.00 0.20 0.10 6.30 2.00 2 0.62 29.62 4.00 1.00 22.80 5.70 4.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 2 0.62 111.06 120.00 8.00 7.20 0.48 15.00

RB2 (5Mtr) Tulangan Utama A 16 5.00 0.40 0.10 5.50 7.00 2 1.58 132.72 14.00 2.00 3.50 0.50 7.00
Tulangan Peminggang B 10 5.00 0.20 0.10 5.30 2.00 2 0.62 14.81 4.00 2.00 1.40 0.70 2.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 2 0.62 111.06 120.00 8.00 7.20 0.48 15.00

RB2 (4Mtr) Tulangan Utama A 16 4.00 0.40 0.10 4.50 7.00 5 1.58 331.80 35.00 2.00 26.25 1.50 17.50
Tulangan Peminggang B 10 4.00 0.20 0.10 4.30 2.00 5 0.62 37.02 10.00 2.00 8.50 1.70 5.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 5 0.62 277.65 300.00 8.00 18.00 0.48 37.50

RB2 (2Mtr) Tulangan Utama A 16 2.00 0.40 0.10 2.50 7.00 6 1.58 199.08 42.00 4.00 5.25 0.50 10.50
Tulangan Peminggang B 10 2.00 0.20 0.10 2.30 2.00 6 0.62 22.21 12.00 4.00 2.10 0.70 3.00
Sengkang C 10 0.21 0.46 0.21 0.46 0.10 1.44 60.00 6 0.62 333.18 360.00 8.00 21.60 0.48 45.00
3,490.11
Ring Balok uk. 15x20 RB3 (6mtr) Tulangan Utama A 10 6.00 0.10 0.10 6.20 5.00 1 0.62 37.02 5.00 1.00 29.00 5.80 5.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 28.00 1 0.40 7.37 28.00 18.00 0.75 0.48 1.56

RB3 (4mtr) Tulangan Utama A 10 4.00 0.10 0.10 4.20 5.00 1 0.62 18.51 5.00 2.00 4.50 1.80 2.50
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 28.00 1 0.40 7.37 28.00 18.00 0.75 0.48 1.56

RB3 (2mtr) Tulangan Utama A 10 2.00 0.10 0.10 2.20 5.00 5 0.62 37.02 25.00 5.00 1.00 0.20 5.00
Sengkang B 8 0.11 0.16 0.11 0.16 0.10 0.64 28.00 5 0.40 36.87 140.00 18.00 3.73 0.48 7.78
144.16
D RUMAH GENSET (POWER HOUSE)

1 SLOEF Type S1 uk 25/40 S1 (5Mtr) Tulangan Utama A 16 5.00 0.30 0.10 5.40 6.00 3 1.58 170.42 18.00 2.00 5.40 0.60 9.00
Tulangan Utama Tump. B 16 1.25 0.30 0.10 1.65 2.00 3 1.58 16.23 6.00 7.00 0.06 0.06 0.86
Tulangan Utama Lap. C 16 2.25 0.30 0.10 2.65 2.00 3 1.58 28.40 6.00 4.00 0.53 0.35 1.50
Tulangan Peminggang D 12 5.00 0.30 0.10 5.40 2.00 3 0.89 31.97 6.00 2.00 1.80 0.60 3.00
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 33.00 3 0.40 52.14 99.00 9.00 9.24 0.84 11.00
S1 (3.5Mtr) Tulangan Utama A 16 3.50 0.30 0.10 3.90 6.00 14 1.58 530.21 84.00 3.00 2.80 0.10 28.00
Tulangan Utama Tump. B 16 0.85 0.30 0.10 1.25 2.00 14 1.58 58.91 28.00 9.00 0.26 0.08 3.11
Tulangan Utama Lap. C 16 1.90 0.30 0.10 2.30 2.00 14 1.58 106.04 28.00 5.00 0.56 0.10 5.60
Tulangan Peminggang D 12 3.50 0.30 0.10 3.90 2.00 14 0.89 99.46 28.00 3.00 0.93 0.10 9.33
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 23.00 14 0.40 169.59 322.00 9.00 30.05 0.84 35.78
1,263.37
2 KOLOM LT.1 Kolom K1 uk. 30x30 K1 Tulangan Utama A 16 3.80 0.10 3.90 16.00 12 1.58 1,817.86 192.00 2.00 201.60 2.10 96.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 24.00 12 0.62 426.47 288.00 5.00 362.88 6.30 57.60
2,244.33
3 BALOK Balok BK1 uk. 25x40 B1 (5Mtr) Tulangan Utama A 16 5.00 0.30 0.10 5.40 6.00 3 1.58 170.42 18.00 2.00 5.40 0.60 9.00
Tulangan Utama Tump. B 16 1.25 0.30 0.10 1.65 2.00 3 1.58 16.23 6.00 7.00 0.06 0.06 0.86
Tulangan Utama Lap. C 16 2.25 0.30 0.10 2.65 2.00 3 1.58 28.40 6.00 4.00 0.53 0.35 1.50
Tulangan Peminggang D 12 5.00 0.30 0.10 5.40 2.00 3 0.89 31.97 6.00 2.00 1.80 0.60 3.00
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 33.00 3 0.40 52.14 99.00 9.00 9.24 0.84 11.00
B1 (3.5Mtr) Tulangan Utama A 16 3.50 0.30 0.10 3.90 6.00 14 1.58 530.21 84.00 3.00 2.80 0.10 28.00
Tulangan Utama Tump. B 16 0.85 0.30 0.10 1.25 2.00 14 1.58 58.91 28.00 9.00 0.26 0.08 3.11
Tulangan Utama Lap. C 16 1.90 0.30 0.10 2.30 2.00 14 1.58 106.04 28.00 5.00 0.56 0.10 5.60
Tulangan Peminggang D 12 3.50 0.30 0.10 3.90 2.00 14 0.89 99.46 28.00 3.00 0.93 0.10 9.33
Sengkang E 8 0.21 0.36 0.21 0.36 0.10 1.24 23.00 14 0.40 169.59 322.00 9.00 30.05 0.84 35.78
1,263.37
4 PLAT BETON ATAP Tulangan Atas X A 10 13.00 0.10 13.10 60.00 1 0.62 488.18 60.00 0.91 5.72 0.09 65.93
Tulangan Atas Y A 10 9.10 0.10 9.20 86.00 1 0.62 636.74 86.00 1.00 240.80 2.80 86.00
Tulangan Bawah X A 10 13.00 0.10 13.10 60.00 1 0.62 488.18 60.00 0.91 5.72 0.09 65.93
Tulangan Bawah Y A 10 9.10 0.10 9.20 86.00 1 0.62 636.74 86.00 1.00 240.80 2.80 86.00
2,249.84
5 Pilecap P1 (120x120x40) P1 Tulangan Utama A 16 1.12 0.32 0.32 0.10 1.86 12.00 12 1.58 454.46 144.00 6.00 3.36 0.14 24.00
Tulangan Utama A 16 1.12 0.32 0.32 0.10 1.86 12.00 12 1.58 454.46 144.00 6.00 3.36 0.14 24.00
Tulangan Atas A 16 1.12 0.10 0.10 0.10 1.42 12.00 12 1.58 340.85 144.00 8.00 1.44 0.08 18.00
Tulangan Atas A 16 1.12 0.10 0.10 0.10 1.42 12.00 12 1.58 340.85 144.00 8.00 1.44 0.08 18.00
1,590.62
6 PEDESTAL KOLOM Kolom Pedestal uk. 30x30 K1 Tulangan Utama A 16 2.35 0.34 0.10 2.79 10.00 12 1.58 568.08 120.00 4.00 6.30 0.21 30.00
Sengkang B 10 0.26 0.26 0.26 0.26 0.10 1.14 14.00 12 0.62 124.39 168.00 10.00 10.08 0.60 16.80
692.47

Pelat Lantai Waremesh M-10


Pelat Lantai Waremesh M-8

BESI
BACK UP DATA QUANTITY MC. 01

Nama Paket :
No. Kontrak :
No. Mata Pembayaran :
Item Pekerjaan :
Satuan : M3

PONDASI BATU KALI BATU KOSONG PASIR URUG


No Keterangan
STA Jarak Luas Volume STA Jarak Luas Volume STA Jarak Luas Volume
BACK UP DATA
1 0+000 0.27 0+000 0.12 0+000 0.04
20.00 20.63 20.00 3.56 - 20.00 1.19
2 0+020 1.79 0+020 0.24 0+020 - 0.08 -
20.00 61.47 20.00 5.82 - 20.00 1.94
3 0+040 4.35 0+040 0.35 0+040 - 0.12 -
20.00 69.89 20.00 6.24 - 20.00 2.08
4 0+060 2.63 0+060 0.28 0+060 - 0.09 -
20.00 51.62 20.00 5.50 - 20.00 1.83
5 0+080 2.53 0+080 0.27 0+080 - 0.09 -
20.00 41.60 20.00 5.00 - 20.00 1.67
0+100 1.63 0+100 0.23 0+100 - 0.08 -
20.00 31.85 20.00 4.49 - 20.00 1.50
0+120 1.55 0+120 0.22 0+120 - 0.07 -
20.00 25.42 20.00 4.08 - 20.00 1.36
0+140 0.99 0+140 0.19 0+140 - 0.06 -
20.00 19.96 20.00 3.73 - 20.00 1.24
1 0+160 1.01 0+160 0.19 0+160 - 0.06 -
20.00 24.25 20.00 4.01 - 20.00 1.34
2 0+180 1.42 0+180 0.21 0+180 - 0.07 -
20.00 22.84 20.00 3.91 - 20.00 1.30
3 0+200 0.86 0+200 0.18 0+200 - 0.06 -
20.00 17.29 20.00 3.53 - 20.00 1.18
4 0+220 0.86 0+220 0.18 0+220 - 0.06 -
20.00 17.29 20.00 3.55 - 20.00 1.18
5 0+240 0.86 0+240 0.18 0+240 - 0.06 -
20.00 17.57 20.00 3.57 - 20.00 1.18
6 0+260 0.89 0+260 0.18 0+260 - 0.06 -
20.00 18.29 20.00 3.61 - 20.00 1.20
0+280 0.94 0+280 0.18 0+280 - 0.06 -
20.00 16.81 20.00 3.49 - 20.00 1.16
0+300 0.74 0+300 0.17 0+300 - 0.06 -
20.00 13.73 20.00 3.24 - 20.00 1.08 470.52
0+320 0.63 0+320 0.16 0+320 - 0.05 -
20.00 12.05 20.00 3.10 - 20.00 1.03
0+340 0.58 0+340 0.15 0+340 - 0.05 -
20.00 11.88 20.00 3.08 - 20.00 1.03
0+360 0.61 0+360 0.16 0+360 - 0.05 -
20.00 12.55 20.00 3.14 - 20.00 1.05
0+380 0.64 0+380 0.16 0+380 - 0.05 -
20.00 15.66 20.00 3.39 - 20.00 1.13
0+400 0.92 0+400 0.18 0+400 - 0.06 -
20.00 18.64 20.00 3.63 - 20.00 1.21
0+420 0.94 0+420 0.18 0+420 - 0.06 -
20.00 18.49 20.00 3.63 - 20.00 1.21
0+440 0.91 0+440 0.18 0+440 - 0.06 -
20.00 19.36 20.00 3.69 - 20.00 1.23
0+460 1.03 0+460 0.19 0+460 - 0.06 -
20.00 20.95 20.00 3.84 - 20.00 1.28
0+480 1.07 0+480 0.20 0+480 - 0.07 -
20.00 21.08 20.00 3.85 - 20.00 1.28
0+500 1.04 0+500 0.19 0+500 - 0.06 -
20.00 24.65 20.00 4.04 - 20.00 1.35
0+520 1.42 0+520 0.21 0+520 - 0.07 -
20.00 14.24 20.00 2.15 - 20.00 0.72
0+540 0+540 0+540 - -
20.00 - 20.00 - - 20.00 -
0+560 0+560 0+560 - -
20.00 - 20.00 - - 20.00 -
0+580 0+580 0+580 - -
20.00 - 20.00 - - 20.00 -
0+600 0+600 0+600 - -
20.00 - 20.00 - - 20.00 -
0+620 0+620 0+620 - -
20.00 - 20.00 - - 20.00 -
0+640 0+640 0+640 - -
20.00 - 20.00 - - 20.00 -
0+660 0+660 0+660 - -
20.00 - 20.00 - - 20.00 -
0+680 0+680 0+680 - -
20.00 - 20.00 - - 20.00 -
0+700 0+700 0+700 - -
20.00 - 20.00 - - 20.00 -
0+720 0+720 0+720 - -
20.00 - 20.00 - - 20.00 -
0+740 0+740 0+740 - -
20.00 - 20.00 - - 20.00 -
0+760 0+760 0+760 - -
20.00 - 20.00 - - 20.00 -
0+780 0+780 0+780 - -
20.00 - 20.00 - - 20.00 -
0+800 0+800 0+800 - -
20.00 - 20.00 - - 20.00 -
0+820 0+820 0+820 - -
20.00 - 20.00 - - 20.00 -
0+840 0+840 0+840 - -
20.00 - 20.00 - - 20.00 -
0+860 0+860 0+860 - -
20.00 - 20.00 - - 20.00 -
0+880 0+880 0+880 - -
20.00 - 20.00 - - 20.00 -
0+900 0+900 0+900 - -
20.00 - 20.00 - - 20.00 -
0+920 0+920 0+920 - -
20.00 - 20.00 - - 20.00 -
0+940 0+940 0+940 - -
20.00 - 20.00 - - 20.00 -
0+960 0+960 0+960 - -
20.00 - 20.00 - - 20.00 -
0+980 0+980 0+980 - -
20.00 - 20.00 - - 20.00 -
0+1000 0+1000 0+1000 - -
20.00 - 20.00 - - 20.00 -
0+1020 0+1020 0+1020 - -
20.00 42.48 20.00 3.42 - 20.00 1.14
0+1040 4.25 0+1040 0.34 0+1040 - 0.11 -
20.00 83.37 20.00 6.79 - 20.00 2.26
0+1060 4.09 0+1060 0.34 0+1060 - 0.11 -
20.00 80.22 20.00 6.68 - 20.00 2.23
0+1080 3.93 0+1080 0.33 0+1080 - 0.11 -
20.00 77.96 20.00 6.59 - 20.00 2.20
0+1100 3.86 0+1100 0.33 0+1100 - 0.11 -
20.00 73.74 20.00 6.43 - 20.00 2.14
0+1120 3.51 0+1120 0.31 0+1120 - 0.10 -
20.00 61.27 20.00 5.91 - 20.00 1.97
0+1140 2.62 0+1140 0.28 0+1140 - 0.09 -
20.00 51.02 20.00 5.47 - 20.00 1.82
0+1160 2.49 0+1160 0.27 0+1160 - 0.09 -
20.00 53.13 20.00 5.57 - 20.00 1.86
0+1180 2.83 0+1180 0.29 0+1180 - 0.10 -
20.00 54.15 20.00 5.62 - 20.00 1.87
0+1200 2.59 0+1200 0.28 0+1200 - 0.09 -
20.00 49.48 20.00 5.40 - 20.00 1.80
0+1220 2.36 0+1220 0.26 0+1220 - 0.09 -
20.00 44.68 20.00 5.17 - 20.00 1.72
0+1240 2.11 0+1240 0.25 0+1240 - 0.08 -
20.00 39.75 20.00 4.92 - 20.00 1.64
0+1260 1.87 0+1260 0.24 0+1260 - 0.08 - 900.79
20.00 35.05 20.00 4.67 - 20.00 1.56
0+1280 1.64 0+1280 0.23 0+1280 - 0.08 -
20.00 29.95 20.00 4.38 - 20.00 1.46
0+1300 1.36 0+1300 0.21 0+1300 - 0.07 -
20.00 25.98 20.00 4.13 - 20.00 1.38
0+1320 1.24 0+1320 0.20 0+1320 - 0.07 -
20.00 23.64 20.00 3.98 - 20.00 1.33
0+1340 1.12 0+1340 0.20 0+1340 - 0.07 -
20.00 21.72 20.00 3.85 - 20.00 1.28
0+1360 1.05 0+1360 0.19 0+1360 - 0.06 -
20.00 21.26 20.00 3.82 - 20.00 1.27
0+1380 1.08 0+1380 0.19 0+1380 - 0.06 -
20.00 30.03 20.00 4.36 - 20.00 1.45
0+1400 1.93 0+1400 0.24 0+1400 - 0.08 -
20.00 91.34 20.00 6.79 - 20.00 2.26
0+1420 7.21 0+1420 0.44 0+1420 - 0.15 -
20.00 133.08 20.00 8.41 - 20.00 2.80
0+1440 6.10 0+1440 0.41 0+1440 - 0.14 -
20.00 95.25 20.00 7.17 - 20.00 2.39
0+1460 3.42 0+1460 0.31 0+1460 - 0.10 -
20.00 68.98 20.00 6.25 - 20.00 2.08
0+1480 3.47 0+1480 0.31 0+1480 - 0.10 -
20.00 59.22 20.00 5.47 - 20.00 1.82
0+1500 2.45 0+1500 0.23 0+1500 - 0.08 -
20.00 51.47 20.00 5.15 - 20.00 1.72
0+1520 2.70 0+1520 0.28 0+1520 - 0.09 -
20.00 61.91 20.00 5.95 - 20.00 1.98
0+1540 3.49 0+1540 0.31 0+1540 - 0.10 -
20.00 63.94 20.00 5.74 - 20.00 1.91
0+1560 2.90 0+1560 0.26 0+1560 - 0.09 -
16.00 25.38 16.00 3.03 - 16.00 1.01
0+1576 0.27 0+1576 0.12 0+1576 0.04 838.20

2,209.5 255.991 85.317


VOLUME UNTUK PAGAR BATA 1,308.7 150.469 50.142
VOLUME UNTUK PAGAR BRC 900.788 105.522 35.174