DAFTAR HARGA SATUAN BAHAN DAN UPAH

A. HARGA BAHAN
No NAMA BAHAN HARGA SATUAN SAT KETERANGAN
I. BAHAN KAYU
1 Kayu meranti papan 2/20 Rp 2,830,000 m³
2 Kayu meranti usuk 4/5/7 Rp 4,500,000 m³
3 Dolkem kayu gelam Rp 8,500 batang
4 Kayu meranti Bekisting Rp 3,200,000 m³
5 Kayu Jati balok 5/7, 6/15, 6/12, 8/ Rp 18,417,200 m³
6 Kayu Jati Rp 18,624,000
7 Gypsum Board Rp 67,000 Lbr
8 list kayu profil Rp 22,000 kg
9 Triplek 110x220x4mm Rp 67,700 lbr
II. BAHAN SEMEN & PASIR
1 Semen PC 50 kg Rp 66,000 zak
2 Pasir pasang/plester Rp 168,400
3 Pasir cor Rp 232,100
4 Pasir Urug Rp 143,500
5 Semen PC 40 kg Rp 63,000
6 semen berwarna Rp 11,200
III. BAHAN BESI, PAKU & BATU
1 paku biasa 2-5 inchi Rp 27,000
2 batu pecah mesin 2/3 cm Rp 262,000
3 batu bata merah (22x11x4,5cm) Rp 950
4 Seng Gelombang (0,8x1,50) Rp 59,000
5 Plat besi/baja Rp 25,000
6 batu kali 15/20 Rp 428,000
7 batu mesin pecah 1/2 cm Rp 466,000
8 besi beton polos Rp 12,000
9 paku triplek Rp 22,000
10 paku klem no.4/(beton) Rp 19,000
11 paku kayu segala ukuran Rp 67,000
12 Genteng wuwung galvalum Rp 86,000
IV. BAHAN LAINNYA
1 Kaca Polos 5 mm Rp 9,520
2 Kunci Tanam Rp 10,500
3 Air (biaya air tawar) Rp 27
4 Kawat Ikat Rp 23,000
5 Minyak Bekisting Rp 28,300
6 Lem Kayu 1/2 kg Rp 12,000
7 Closet Duduk Porselin (Komplit) Rp 2,500,000
8 Kran Air Dia. 3/4 Rp 40,000
9 Rol TBA Rp 10,000
10 Bak cuci piring stainlees Rp 847,500
11 Pipa Plastik PVC Tipe AW Uk 3" Rp 36,000
12 Pipa Plastik PVC Tipe AW Uk 4" Rp 36,000
13 Keramik Lantai Bermotif Uk. 40x4 Rp 81,000
14 Keramik Lantai Bermotif Uk. 20x2 Rp 81,000
15 Keramik Lantai Bermotif Uk. 15x3 Rp 81,000
16 Kunci Tanam Besar (kuningan) Rp 120,000
17 Kunci Tanam Kecil (kuningan) Rp 70,000
18 Engsel Jendela Rp 20,000
19 Engsel Pintu Rp 39,000
20 Grendel Biasa Kecil Rp 10,000
21 Lampu Pijar 5 - 40 Watt Rp 20,800
22 Kabel NYA 2.5 mm Rp 5,927
23 Isolator Rp 10,069
24 Fiting Plafond Rp 12,413
25 Las Doof Rp 895
26 Saklar Broco Tunggal Rp 29,900
27 T Dos PVC Rp 1,677
28 Pipa PVC 5/8" Rp 8,262
29 Cat Tembok Luar Rp 228,600
30 Dempul Tembok Rp 3,300
31 Kertas Gosok Halus Rp 16,000
32 Cat Plafond Rp 135,000
B. HARGA UPAH
No NAMA UPAH HARGA SATUAN SAT KETERANGAN

1 mandor Rp 120,000 OH
2 pembantu tukang Rp 99,000 OH
3 tukang Rp 105,000 OH
4 kepala tukang Rp 110,000 OH
5 tukang batu Rp 110,000 OH

Rp 6,917,408,879
A. PEKERJAAN PERSIAPAN
Jenis Pekerjaan = Pembersihan Lokasi Ringan
Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1.Pembantu Tukang OH 0.050
2. Mandor OH 0.025
B. BAHAN.
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pengukuran dan Pemasangan Bowplan


Satuan Pembayaran = m'

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.100
2.Pembantu Tukang OH 0.100
3.Kepala Tukang OH 0.010
4. Mandor OH 0.005
B. BAHAN.
1. Paku Biasa 2- 5 inchi Doz 0.020
2. Kayu Meranti Papan 2/20 m3 0.007
3. Kayu Meranti Usuk 5/7 m3 0.012
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pembuatan Gudang/Direksi Keet


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1 Mandor OH 0.05
2 Kepala Tukang OH 0.30
3 Tukang OH 1.00
4 Tukang OH 1.00
5 Pembantu Tukang OH 2.00
B. BAHAN.
1 Semen PC 50 kg zak 0.70
2 Kaca Polos 5 mm m2 0.08
3 Pasir Pasang/Plester m3 0.15
4 Pasir Cor/Beton m3 0.10
5 Batu Pecah Mesin 2/3cm m3 0.15
6 Batu Bata Merah (uk 22x11x4,5cm) buah 30.00
7 Seng Gelombang (Uk 0,8 x 1,50) lembar 0.25
8 Plat besi / Baja kg 1.10
9 Kunci Tanam buah 0.15
10 Paku Biasa 2-5 inchi doz 0.85
11 Triplek Uk 110x210x4 mm lembar 0.06
12 Kayu Meranti Usuk 4/6, 5/7 m3 0.18
13 Dolken Kayu gelam batang 1.25
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

B. PEKERJAAN TANAH

Jenis Pekerjaan = Galian Pondasi Batu Kali


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1.Pembantu Tukang OH 0.750
2. Mandor OH 0.025
B. BAHAN.
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Galian Pondasi Telapak


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1.Pembantu Tukang OH 0.800
2. Mandor OH 0.025
B. BAHAN.
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Urugan Pasir Bawah Pondasi Batu Ka


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1.Pembantu Tukang OH 0.30
2. Mandor OH 0.01
B. BAHAN.
0 0.00
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Urugan Pasir Bawah Pondasi Telapak


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1.Pembantu Tukang OH 0.37
2. Mandor OH 0.02
B. BAHAN.
0 0 0
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Batu Kali Kosongan (aan


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Kepala Tukang OH 0.039
2. Mandor OH 0.039
3. Tukang OH 0.39
4.Pembantu Tukang OH 0.78
B. BAHAN.
1. Pasir Urug m3 0.432
2. Batu Kali Belah 15/20 m3 1.2
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pasang Batu Kali Belah (1 Pc : 3 Ps)


Satuan Pembayaran = m3
NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Kepala Tukang OH 0.075
2. Mandor OH 0.075
3. Tukang OH 0.75
4.Pembantu Tukang OH 1.5
B. BAHAN.
1. Batu Belah 15/20 m3 1.2
2.Pasir Pasang m3 0.485
3. Semen PC 50 kg Zak 4.04
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemadatan Tanah Kembali Pondasi Ba


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1.Pembantu Tukang OH 0.3
2. Mandor OH 0.01
B. BAHAN.
1.Pasir Urug m3 1.2
C. PERALATAN.

Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Urugan Tanah Bawah Pondasi Telapak


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1.Pembantu Tukang OH 0.37
2. Mandor OH 0.02
B. BAHAN.
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

C. PEKERJAAN BETON DAN PEMBESIAN

Jenis Pekerjaan = Lantai Kerja K-100


Satuan Pembayaran = m2
NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.06
2. Kepala Tukang OH 0.02
3. Tukang OH 0.2
4. Pembantu Tukang OH 1.2
B. BAHAN.
1. Semen PC 40 kg Zak 5.75
2. Pasir Cor/Beton m3 0.558
3. Batu Pecah Mesin 1/2 cm m3 0.54
4. Air (biaya air tawar) liter 215.000
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Pondasi Beton Bertulang (15


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 1.3
2. Mandor OH 0.265
3.Tukang OH 0.275
4.Tukang OH 1.05
5.Kepala Tukang OH 0.262
6.Pembantu Tukang OH 5.3
B. BAHAN.
1. Semen PC 40 kg Zak 8.4
2. Pasir Cor m3 0.54
3. Batu Pecah Mesin 1/2 cm m3 0.81
4. Besi Beton Polos kg 157.5
5. Paku Triplek kg 1.5
6. Kawat Ikat kg 2.25
7. Kayu Meranti Bekisting m3 0.2
8. Minyak Bekisting liter 0.4
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Sloof Beton Bertulang (200


Satuan Pembayaran = m3

NO URAIAN SATUAN KOEFISIEN


A. TENAGA KERJA
1. Tukang OH 1.56
2. Mandor OH 0.283
3.Tukang OH 0.275
4.Tukang OH 1.4
5.Kepala Tukang OH 0.323
6.Pembantu Tukang OH 5.65
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
8. Minyak Bekisting liter 0.6
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Kolom Praktis (15x15) cm +


Satuan Pembayaran = m'

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.009
2. Kepala Tukang OH 0.006
3. Tukang OH 0.02
4. Tukang OH 0.02
5. Tukang OH 0.02
6. Pembantu Tukang OH 0.18
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Kolom Struktur (20x20) cm


Satuan Pembayaran = m'
NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0092
2. Kepala Tukang OH 0.00604
3. Tukang OH 0.03
4. Tukang OH 0.03
5. Tukang OH 0.03
6. Pembantu Tukang OH 0.2
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Tangga + begesting


Satuan Pembayaran = m'

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.01
2. Kepala Tukang OH 0.0084
3. Tukang OH 0.055
4. Tukang OH 0.055
5. Tukang OH 0.055
6. Pembantu Tukang OH 0.35
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Bodres + Begesting


Satuan Pembayaran = m'
NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.01
2. Kepala Tukang OH 0.0072
3. Tukang OH 0.043
4. Tukang OH 0.043
5. Tukang OH 0.043
6. Pembantu Tukang OH 0.24
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Balok 20/30


Satuan Pembayaran = m'

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.02
2. Kepala Tukang OH 0.008
3. Tukang OH 0.045
4. Tukang OH 0.045
5. Tukang OH 0.045
6. Pembantu Tukang OH 0.24
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Ring Balok 15/20


Satuan Pembayaran = m'

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.02
2. Kepala Tukang OH 0.008
3. Tukang OH 0.045
4. Tukang OH 0.045
5. Tukang OH 0.045
6. Pembantu Tukang OH 0.24
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Membuat Plat Lantai, t=12cm


Satuan Pembayaran = m'

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.03
2. Kepala Tukang OH 0.008
3. Tukang OH 0.047
4. Tukang OH 0.047
5. Tukang OH 0.047
6. Pembantu Tukang OH 0.243
B. BAHAN.
1. Semen PC 40 kg Zak 0.1
2. Pasir Cor m3 0.006
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 3
5. Paku Triplek kg 0.01
6. Kawat Ikat kg 0.045
7. Kayu Meranti Bekisting m3 0.002
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan
D. PEKERJAAN DINDING

Jenis Pekerjaan = Pass. Transram, t=1/2 Bata 1 Pc : 3 Ps


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.2
2. Mandor OH 0.03
3. Tukang Batu OH 0.02
4.Pembantu Tukang OH 0.6
B. BAHAN.
1. Bata Merah buah 140
2.Pasir Pasang m3 0.093
3. Semen PC 50 kg Zak 0.531
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pass. Dinding, t=1/2 Bata 1 Pc : 6 Ps


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.17
2. Mandor OH 0.023
3. Tukang Batu OH 0.018
4. Pembantu Tukang OH 0.5
B. BAHAN.
1. Bata Merah buah 140
2.Pasir Pasang m3 0.093
3. Semen PC 50 kg Zak 0.531
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pekerjaan Plesteran Halus 1 Pc : 2 Ps t


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.15
2. Mandor OH 0.015
3.Kepala Tukang OH 0.015
4.Pembantu tukang OH 0.3
B. BAHAN.
1. Pasir Pasang m3 0.02
2. Semen PC 50 kg Zak 0.20448
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pekerjaan Acian


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.1
2. Mandor OH 0.01
3.Kepala Tukang OH 0.01
4. Pembantu Tukang OH 0.2
B. BAHAN.
1. Semen PC 50 kg Zak 0.065
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

E. PEKERJAAN KAYU

Jenis Pekerjaan = Kusen Pintu/Jendela Kayu Jati


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.35
2. Kepala Tukang OH 2.1
3. Tukang OH 21
4. Pembantu Tukang OH 7
B. BAHAN.
1. Lem Kayu 1/2 kg kg 1
2. Paku Klem (No 4)/Beton doz 1.25
3. Kayu jati Balok 5/7, 6/15, 6/12,8/12 m3 1.1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Daun Pintu


Satuan Pembayaran = m2
NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.35
2. Kepala Tukang OH 2.1
3. Tukang OH 21
4. Pembantu Tukang OH 7
B. BAHAN.
1. Lem Kayu 1/2 kg kg 1
2. Paku Klem (No 4)/Beton doz 1.25
3. Kayu jati m3 1.2
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Jendela Kaca


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.35
3. Tukang OH 21
B. BAHAN.
1. Lem Kayu 1/2 kg kg 1
2 Kaca Polos 5 mm m2 0.08
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

F. PEKERJAAN PLAFON

Jenis Pekerjaan = Pasang Plafond Gypsum 9 mm


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.005
2. Kepala Tukang OH 0.005
3. Tukang OH 0.05
4. Pembantu Tukang OH 0.1
B. BAHAN.
1. Paku triplek kg 0.11
2. Gypsum Board lembar 0.364
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan
Jenis Pekerjaan = Pasang Lis Plafond
Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0043
2. Kepala Tukang OH 0.004
3. Tukang OH 0.034
4. Pembantu Tukang OH 0.08
B. BAHAN.
1. List Kayu Profil kg 1.3
2. Paku Kayu Segala Ukuran lembar 0.02
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

G. PEKERJAAN SANITASI

Jenis Pekerjaan = Kloset Duduk Porselen


Satuan Pembayaran = buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.16
2. Kepala Tukang OH 0.16
3. Tukang OH 1.1
4. Pembantu Tukang OH 1.1
B. BAHAN.
1. Closet Duduk Porselin (Komplit) buah 1
2. Closet Duduk Porselin (Komplit) buah 0.06
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Kran Air


Satuan Pembayaran = buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Kepala Tukang OH 0.03
2. Tukang OH 0.15
B. BAHAN.
1. Kran Air Dia. 3/4 buah 1
2. Rol TBA buah 1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Memasang bak cuci piring stainlees


Satuan Pembayaran = buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0300
2. Kepala Tukang OH 0.3000
3. Tukang OH 0.0300
4. Pembantu Tukang OH 0.0015
B. BAHAN.
1. Bak cuci piring stainlees Unit 1.0000
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Pipa Air Bersih diameter


Satuan Pembayaran = m

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0018
2. Kepala Tukang OH 0.006
3. Tukang OH 0.06
4. Pembantu Tukang OH 0.036
B. BAHAN.
1. Pipa Plastik PVC Tipe AW Uk 3" Batang 0.3
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Pipa Air Kotor diameter


Satuan Pembayaran = m

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0018
2. Kepala Tukang OH 0.006
3. Tukang OH 0.06
4. Pembantu Tukang OH 0.036
B. BAHAN.
1. Pipa Plastik PVC Tipe AW Uk 4" Batang 0.32
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Sumur Resapan


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.17
2. Mandor OH 0.023
3. Tukang Batu OH 0.018
4. Pembantu Tukang OH 0.5
B. BAHAN.
1. Bata Merah buah 140
2. Pasir Pasang m3 0.093
3. Semen PC 50 kg Zak 0.531
4. Batu Pecah Mesin 1/2 cm m3 0.009
5. Besi Beton Polos kg 1.75
6. Pasir cor m3 0.1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Septic Tank


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.16
2. Mandor OH 0.02
3. Tukang Batu OH 0.015
4. Pembantu Tukang OH 0.4
B. BAHAN.
1. Pasir Pasang m3 0.093
2. Semen PC 50 kg Zak 0.531
3. Batu Pecah Mesin 1/2 cm m3 0.009
4. Besi Beton Polos kg 1.75
5. Pasir cor m3 0.1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan
H. PEKERJAAN LANTAI

Jenis Pekerjaan = Pasang Keramik (40x40) cm


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.05
2. Mandor OH 0.025
3. Kepala Tukang OH 0.39
B. BAHAN.
1. Semen PC 50 kg Zak 0.208
2. Semen Berwarna kg 1.62
3. Pasir Pasang m3 0.045
4. Keramik Lantai Bermotif Uk. 40x40 cm m2 1.061
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pasang Keramik (20x20) cm


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.05
2. Mandor OH 0.025
3. Kepala Tukang OH 0.39
B. BAHAN.
1. Semen PC 50 kg Zak 0.208
2. Semen Berwarna kg 1.62
3. Pasir Pasang m3 0.045
4. Keramik Lantai Bermotif Uk. 20x20 cm m2 1.060
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pasang Keramik (15x30) cm


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.05
2. Mandor OH 0.025
3. Kepala Tukang OH 0.39
B. BAHAN.
1. Semen PC 50 kg Zak 0.208
2. Semen Berwarna kg 1.62
3. Pasir Pasang m3 0.045
4. Keramik Lantai Bermotif Uk. 15x30 cm m2 1.054
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

I. PEKERJAAN KUNCI

Jenis Pekerjaan = Pemasangan Kunci Pintu Ruang


Satuan Pembayaran = Buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.005
2. Kepala Tukang OH 0.01
3. Tukang OH 0.5
4. Pembantu Tukang OH 0.01
B. BAHAN.
1. Kunci Tanam Besar (kuningan) Buah 1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Kunci Kamar Mandi


Satuan Pembayaran = Buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.005
2. Kepala Tukang OH 0.01
3. Tukang OH 0.5
4. Pembantu Tukang OH 0.01
B. BAHAN.
1. Kunci Tanam Kecil (kuningan) Buah 0.8
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Engsel Kuningan Untuk J


Satuan Pembayaran = Buah
NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0005
2. Kepala Tukang OH 0.01
3. Tukang OH 0.1
4. Pembantu Tukang OH 0.01
B. BAHAN.
1. Engsel Jendela Pasang 1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Engsel Kuningan Untuk P


Satuan Pembayaran = Buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.00075
2. Kepala Tukang OH 0.015
3. Tukang OH 0.15
4. Pembantu Tukang OH 0.015
B. BAHAN.
1. Engsel Pintu Pasang 1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Grendel Pintu (Kecil)


Satuan Pembayaran = Buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Tukang OH 0.12
2. Pembantu Tukang OH 0.06
B. BAHAN.
1. Grendel Biasa Kecil Pasang 1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

J. PEKERJAAN INSTALASI LISTRIK

Jenis Pekerjaan = 1 Titik Pemasangan Titik Lampu Pijar


Satuan Pembayaran = Buah
NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.03
2. Kepala Tukang OH 0.03
3. Tukang OH 0.25
4. Pembantu Tukang OH 0.25
B. BAHAN.
1. Lampu Pijar 5 - 40 Watt M' 1
2. Kabel NYA 2.5 mm buah 10
3. Isolator buah 4
4. Fiting Plafond lonjor 1
5 .Las Doof buah 2
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Stop Kontak


Satuan Pembayaran = Buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.05
2. Kepala Tukang OH 0.05
3. Tukang OH 0.5
4. Pembantu Tukang OH 0.5
B. BAHAN.
1.Kabel NYA 2.5 mm M' 10
2.Saklar Broco Tunggal buah 1
3.T Dos PVC buah 1
4. Pipa PVC 5/8" lonjor 0.65
5. Las Doof buah 3
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Saklar Ganda


Satuan Pembayaran = Buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.05
2. Kepala Tukang OH 0.05
3. Tukang OH 0.5
4. Pembantu Tukang OH 0.5
B. BAHAN.
1.Kabel NYA 2.5 mm M' 10
2.Saklar Broco Tunggal buah 1
3.T Dos PVC buah 1
4. Pipa PVC 5/8" lonjor 0.65
5. Las Doof buah 3
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pemasangan Saklar Tunggal


Satuan Pembayaran = Buah

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.05
2. Kepala Tukang OH 0.05
3. Tukang OH 0.5
4. Pembantu Tukang OH 0.5
B. BAHAN.
1.Kabel NYA 2.5 mm M' 6
2.Saklar Broco Tunggal buah 1
3.T Dos PVC buah 1
4. Pipa PVC 5/8" lonjor 0.65
5. Las Doof buah 2
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

K. PEKERJAAN ATAP

Jenis Pekerjaan = Pemasangan Genteng


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0025
2. Kepala Tukang OH 0.0063
3. Tukang OH 0.063
4. Pembantu Tukang OH 0.025
B. BAHAN.
1. Genteng Wuwung Gavalum Kaleng 0.12
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

L. PEKERJAAN FINISHING

Jenis Pekerjaan = Pengecatan Dindidng Luar Baru


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0025
2. Kepala Tukang OH 0.0063
3. Tukang OH 0.063
4. Pembantu Tukang OH 0.025
B. BAHAN.
1. Cat Tembok Luar Kaleng 0.1
2. Dempul Tembok Kg 0.1
3. Kertas Gosok Halus Lembar 0.1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pengecatan Dinding Dalam Baru


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0025
2. Kepala Tukang OH 0.0063
3. Tukang OH 0.063
4. Pembantu Tukang OH 0.025
B. BAHAN.
1. Cat Tembok Dalam Kaleng 0.1
2. Dempul Tembok Kg 0.1
3. Kertas Gosok Halus Lembar 0.1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan

Jenis Pekerjaan = Pengecatan Plafond


Satuan Pembayaran = m2

NO URAIAN SATUAN KOEFISIEN

A. TENAGA KERJA
1. Mandor OH 0.0025
2. Kepala Tukang OH 0.0063
3. Tukang OH 0.063
4. Pembantu Tukang OH 0.025
B. BAHAN.
1. Cat Plafond Kaleng 0.1
2. Kertas Gosok Halus Lembar 0.1
C. PERALATAN.
Jumlah Harga Satuan Pekerjaan
RSIAPAN
ersihan Lokasi Ringan

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 99,000 Rp 4,950
Rp 120,000 Rp 3,000

Rp 7,950

ukuran dan Pemasangan Bowplank

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 10,500
Rp 99,000 Rp 9,900
Rp 110,000 Rp 1,100
Rp 120,000 600

Rp 27,000 Rp 540
Rp 2,830,000 Rp 19,810
Rp 4,500,000 Rp 54,000

Rp 96,450

uatan Gudang/Direksi Keet

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 6,000
Rp 110,000 Rp 33,000
Rp 105,000 Rp 105,000
Rp 105,000 Rp 105,000
Rp 99,000 Rp 198,000
Rp 66,000 Rp 46,200
Rp 9,520 Rp 762
Rp 168,400 Rp 25,260
Rp 232,100 Rp 23,210
Rp 262,000 Rp 39,300
Rp 950 Rp 28,500
Rp 59,000 Rp 14,750
Rp 25,000 Rp 27,500
Rp 10,500 Rp 1,575
Rp 27,000 Rp 22,950
Rp 67,700 Rp 4,062
Rp 4,500,000 Rp 810,000
Rp 8,500 Rp 10,625

Rp 1,501,694

TANAH

n Pondasi Batu Kali

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 99,000 Rp 74,250
Rp 120,000 Rp 3,000

Rp 77,250

n Pondasi Telapak

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 99,000 Rp 79,200
Rp 120,000 Rp 3,000

Rp 82,200

an Pasir Bawah Pondasi Batu Kali


HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 99,000 Rp 29,700
Rp 120,000 Rp 1,200

Rp - Rp -

Rp 30,900

an Pasir Bawah Pondasi Telapak

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 99,000 Rp 36,630
Rp 120,000 Rp 2,400

Rp - Rp -

Rp 39,030

sangan Batu Kali Kosongan (aanstampang)

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 110,000 Rp 4,290
Rp 120,000 Rp 4,680
Rp 105,000 Rp 40,950
Rp 99,000 Rp 77,220

Rp 143,500 Rp 61,992
Rp 428,000 Rp 513,600

Rp 702,732

ng Batu Kali Belah (1 Pc : 3 Ps)


HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 110,000 Rp 8,250
Rp 120,000 Rp 9,000
Rp 105,000 Rp 78,750
Rp 99,000 Rp 148,500

Rp 428,000 Rp 513,600
Rp 168,400 Rp 81,674
Rp 66,000 Rp 266,640

Rp 1,106,414

datan Tanah Kembali Pondasi Batu Kali

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 99,000 Rp 29,700
Rp 120,000 Rp 1,200

Rp 143,500 Rp 172,200

Rp 203,100

an Tanah Bawah Pondasi Telapak

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 99,000 Rp 36,630
Rp 120,000 Rp 2,400

Rp 39,030

AN PEMBESIAN

i Kerja K-100
HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 7,200
Rp 110,000 Rp 2,200
Rp 105,000 Rp 21,000
Rp 99,000 Rp 118,800

Rp 63,000 Rp 362,250
Rp 232,100 Rp 129,512
Rp 466,000 Rp 251,640
Rp 27 Rp 5,805

Rp 898,407

buat Pondasi Beton Bertulang (150 kg besi + Bekisting)

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 136,500
Rp 120,000 Rp 31,800
Rp 105,000 Rp 28,875
Rp 105,000 Rp 110,250
Rp 110,000 Rp 28,820
Rp 99,000 Rp 524,700

Rp 63,000 Rp 529,200
Rp 232,100 Rp 125,334
Rp 466,000 Rp 377,460
Rp 12,000 Rp 1,890,000
Rp 22,000 Rp 33,000
Rp 23,000 Rp 51,750
Rp 3,200,000 Rp 640,000
Rp 28,300 Rp 11,320

Rp 4,519,009

buat Sloof Beton Bertulang (200 kg besi + Bekisting)

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)
Rp 105,000 Rp 163,800
Rp 120,000 Rp 33,960
Rp 105,000 Rp 28,875
Rp 105,000 Rp 147,000
Rp 110,000 Rp 35,530
Rp 99,000 Rp 559,350

Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400
Rp 28,300 Rp 16,980

Rp 1,041,037

buat Kolom Praktis (15x15) cm + begesting

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 1,080
Rp 110,000 Rp 660
Rp 105,000 Rp 2,100
Rp 105,000 Rp 2,100
Rp 105,000 Rp 2,100
Rp 99,000 Rp 17,820

Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400

Rp 81,402

buat Kolom Struktur (20x20) cm + begesting


HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 1,104
Rp 110,000 Rp 664
Rp 105,000 Rp 3,150
Rp 105,000 Rp 3,150
Rp 105,000 Rp 3,150
Rp 99,000 Rp 19,800

Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400

Rp 86,560

buat Tangga + begesting

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 1,200
Rp 110,000 Rp 924
Rp 105,000 Rp 5,775
Rp 105,000 Rp 5,775
Rp 105,000 Rp 5,775
Rp 99,000 Rp 34,650
Rp -
Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400

Rp 109,641

buat Bodres + Begesting


HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 1,200
Rp 110,000 Rp 792
Rp 105,000 Rp 4,515
Rp 105,000 Rp 4,515
Rp 105,000 Rp 4,515
Rp 99,000 Rp 23,760

Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400

Rp 94,839

buat Balok 20/30

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 2,400
Rp 110,000 Rp 880
Rp 105,000 Rp 4,725
Rp 105,000 Rp 4,725
Rp 105,000 Rp 4,725
Rp 99,000 Rp 23,760

Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400

Rp 96,757

buat Ring Balok 15/20


HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 2,400
Rp 110,000 Rp 880
Rp 105,000 Rp 4,725
Rp 105,000 Rp 4,725
Rp 105,000 Rp 4,725
Rp 99,000 Rp 23,760

Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400

Rp 96,757

buat Plat Lantai, t=12cm

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 3,600
Rp 110,000 Rp 880
Rp 105,000 Rp 4,935
Rp 105,000 Rp 4,935
Rp 105,000 Rp 4,935
Rp 99,000 Rp 24,057

Rp 63,000 Rp 6,300
Rp 232,100 Rp 1,393
Rp 466,000 Rp 4,194
Rp 12,000 Rp 36,000
Rp 22,000 Rp 220
Rp 23,000 Rp 1,035
Rp 3,200,000 Rp 6,400

Rp 98,884
DINDING

Transram, t=1/2 Bata 1 Pc : 3 Ps

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 21,000
Rp 120,000 Rp 3,600
Rp 110,000 Rp 2,200
Rp 99,000 Rp 59,400

Rp 950 Rp 133,000
Rp 168,400 Rp 15,661
Rp 66,000 Rp 35,046

Rp 269,907

Dinding, t=1/2 Bata 1 Pc : 6 Ps

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 17,850
Rp 120,000 Rp 2,760
Rp 110,000 Rp 1,980
Rp 99,000 Rp 49,500

Rp 950 Rp 133,000
Rp 168,400 Rp 15,661
Rp 66,000 Rp 35,046

Rp 255,797

jaan Plesteran Halus 1 Pc : 2 Ps tebal 1,5 cm


(Dinding dan Transram)

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 15,750
Rp 120,000 Rp 1,800
Rp 110,000 Rp 1,650
Rp 99,000 Rp 29,700

Rp 168,400 Rp 3,368
Rp 66,000 Rp 13,496

Rp 65,764

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 10,500
Rp 120,000 Rp 1,200
Rp 110,000 Rp 1,100
Rp 99,000 Rp 19,800

Rp 66,000 Rp 4,290

Rp 36,890

KAYU

n Pintu/Jendela Kayu Jati

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 42,000
Rp 110,000 Rp 231,000
Rp 105,000 Rp 2,205,000
Rp 99,000 Rp 693,000

Rp 12,000 Rp 12,000
Rp 19,000 Rp 23,750
Rp 18,417,200 Rp 20,258,920

Rp 23,465,670
HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 42,000
Rp 110,000 Rp 231,000
Rp 105,000 Rp 2,205,000
Rp 99,000 Rp 693,000

Rp 12,000 Rp 12,000
Rp 19,000 Rp 23,750
Rp 18,417,200 Rp 22,100,640

Rp 25,307,390

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 42,000
Rp 105,000 Rp 2,205,000

Rp 12,000 Rp 12,000
Rp 9,520 Rp 762

Rp 2,259,762

PLAFON

ng Plafond Gypsum 9 mm

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 600
Rp 110,000 Rp 550
Rp 105,000 Rp 5,250
Rp 99,000 Rp 9,900

Rp 22,000 Rp 2,420
Rp 67,000 Rp 24,388

Rp 43,108
ng Lis Plafond

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 516
Rp 110,000 Rp 440
Rp 105,000 Rp 3,570
Rp 99,000 Rp 7,920

Rp 22,000 Rp 28,600
Rp 67,000 Rp 1,340

Rp 42,386

N SANITASI

et Duduk Porselen

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 19,200
Rp 110,000 Rp 17,600
Rp 105,000 Rp 115,500
Rp 99,000 Rp 108,900

Rp 2,500,000 Rp 2,500,000
Rp 2,500,000 Rp 150,000

Rp 2,911,200

sangan Kran Air

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 110,000 Rp 3,300
Rp 105,000 Rp 15,750
Rp 40,000 Rp 40,000
Rp 10,000 Rp 10,000

Rp 69,050

asang bak cuci piring stainlees

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 3,600
Rp 110,000 Rp 33,000
Rp 105,000 Rp 3,150
Rp 99,000 Rp 149

Rp 847,500 Rp 847,500

Rp 887,399

sangan Pipa Air Bersih diameter 3"

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 216
Rp 110,000 Rp 660
Rp 105,000 Rp 6,300
Rp 99,000 Rp 3,564

Rp 36,000 Rp 10,800

Rp 21,540

sangan Pipa Air Kotor diameter 4"

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 216
Rp 110,000 Rp 660
Rp 105,000 Rp 6,300
Rp 99,000 Rp 3,564
Rp 36,000 Rp 11,520

Rp 22,260

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 17,850
Rp 120,000 Rp 2,760
Rp 110,000 Rp 1,980
Rp 99,000 Rp 49,500

Rp 950 Rp 133,000
Rp 168,400 Rp 15,661
Rp 66,000 Rp 35,046
Rp 466,000 Rp 4,194
Rp 12,000 Rp 21,000
Rp 232,100 Rp 23,210

Rp 304,201

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 16,800
Rp 120,000 Rp 2,400
Rp 110,000 Rp 1,650
Rp 99,000 Rp 39,600

Rp 168,400 Rp 15,661
Rp 66,000 Rp 35,046
Rp 466,000 Rp 4,194
Rp 12,000 Rp 21,000
Rp 232,100 Rp 23,210

Rp 159,561
LANTAI

ng Keramik (40x40) cm

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 5,250
Rp 120,000 Rp 3,000
Rp 110,000 Rp 42,900

Rp 66,000 Rp 13,728
Rp 11,200 Rp 18,144
Rp 168,400 Rp 7,578
Rp 81,000 Rp 85,925

Rp 176,525

ng Keramik (20x20) cm

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 5,250
Rp 120,000 Rp 3,000
Rp 110,000 Rp 42,900

Rp 66,000 Rp 13,728
Rp 11,200 Rp 18,144
Rp 168,400 Rp 7,578
Rp 81,000 Rp 85,860

Rp 176,460

ng Keramik (15x30) cm

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 5,250
Rp 120,000 Rp 3,000
Rp 110,000 Rp 42,900
Rp -
Rp 66,000 Rp 13,728
Rp 11,200 Rp 18,144
Rp 168,400 Rp 7,578
Rp 81,000 Rp 85,374

Rp 175,974

KUNCI

sangan Kunci Pintu Ruang

HARGA SATUAN JUMLAH HARGA (RP)


(RP)

Rp 120,000 Rp 600
Rp 110,000 Rp 1,100
Rp 105,000 Rp 52,500
Rp 99,000 Rp 990

Rp 120,000 Rp 120,000

Rp 175,190

sangan Kunci Kamar Mandi

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 600
Rp 110,000 Rp 1,100
Rp 105,000 Rp 52,500
Rp 99,000 Rp 990

Rp 70,000 Rp 56,000

Rp 111,190

sangan Engsel Kuningan Untuk Jendela


HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 60
Rp 110,000 Rp 1,100
Rp 105,000 Rp 10,500
Rp 99,000 Rp 990

Rp 20,000 Rp 20,000

Rp 32,650

sangan Engsel Kuningan Untuk Pintu

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 90
Rp 110,000 Rp 1,650
Rp 105,000 Rp 15,750
Rp 99,000 Rp 1,485

Rp 39,000 Rp 39,000

Rp 57,975

sangan Grendel Pintu (Kecil)

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 105,000 Rp 12,600
Rp 99,000 Rp 5,940

Rp 10,000 Rp 10,000

Rp 28,540

LASI LISTRIK

k Pemasangan Titik Lampu Pijar 5-40 watt


HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 3,600
Rp 110,000 Rp 3,300
Rp 105,000 Rp 26,250
Rp 99,000 Rp 24,750

Rp 20,800 Rp 20,800
Rp 5,927 Rp 59,270
Rp 10,069 Rp 40,276
Rp 12,413 Rp 12,413
Rp 895 Rp 1,790

Rp 192,449

sangan Stop Kontak

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 6,000
Rp 110,000 Rp 5,500
Rp 105,000 Rp 52,500
Rp 99,000 Rp 49,500

Rp 5,927 Rp 59,270
Rp 29,900 Rp 29,900
Rp 1,677 Rp 1,677
Rp 8,262 Rp 5,370
Rp 895 Rp 2,685

Rp 212,402

sangan Saklar Ganda

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 6,000
Rp 110,000 Rp 5,500
Rp 105,000 Rp 52,500
Rp 99,000 Rp 49,500

Rp 5,927 Rp 59,270
Rp 29,900.00 Rp 29,900
Rp 1,677.00 Rp 1,677
Rp 8,262.00 Rp 5,370
Rp 895.00 Rp 2,685

Rp 212,402

sangan Saklar Tunggal

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 6,000
Rp 110,000 Rp 5,500
Rp 105,000 Rp 52,500
Rp 99,000 Rp 49,500

Rp 5,927 Rp 35,562
Rp 29,900.00 Rp 29,900
Rp 1,677.00 Rp 1,677
Rp 8,262.00 Rp 5,370
Rp 895.00 Rp 1,790

Rp 187,799

N ATAP

sangan Genteng

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 300
Rp 110,000 Rp 693
Rp 105,000 Rp 6,615
Rp 99,000 Rp 2,475

Rp 86,000 Rp 10,320
Rp 20,403

NISHING

ecatan Dindidng Luar Baru

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 300
Rp 110,000 Rp 693
Rp 105,000 Rp 6,615
Rp 99,000 Rp 2,475

Rp 228,600 Rp 22,860
Rp 3,300 Rp 330
Rp 16,000 Rp 1,600

Rp 34,873

ecatan Dinding Dalam Baru

HARGA SATUAN
JUMLAH HARGA (RP)
(RP)

Rp 120,000 Rp 300
Rp 110,000 Rp 693
Rp 105,000 Rp 6,615
Rp 99,000 Rp 2,475

Rp 228,600 Rp 22,860
Rp 3,300 Rp 330
Rp 16,000 Rp 1,600

Rp 34,873

ecatan Plafond

HARGA SATUAN JUMLAH HARGA (RP)


(RP)
Rp 120,000 Rp 300
Rp 110,000 Rp 693
Rp 105,000 Rp 6,615
Rp 99,000 Rp 2,475

Rp 135,000 Rp 13,500
Rp 16,000 Rp 1,600

Rp 25,183
RENCANA ANGGARAN BIA

NO JENIS PEKERJAAN SATUAN VOLUME


A PEKERJAAN PRSIAPAN
Pembersihan lokasi m² 600
pengukuran & pemasangan Blowplank m² 0.999
Pembuatan gudang/direksi kiet m² 15

B PEKERJAAN TANAH
galian pondasi batu kali m² 335.25
galian pondasi telapak m² 78.4
urugan pasir dibawah batu kali m² 11.18
urugan pasir dibawah pondasi telapak m² 16.8
pemasangan batu kosongan (astampang) m² 44.7
pasangan batu kali ( 1pc: 3Ps) m² 122.925
urugan tanah kembali pondasi batu kali m² 174.86

C PEKERJAAN BETON & PEMBESIAN


Lantai kerja K-100 m² 5.6
pondasi Beton bertulang (150kg+begesting) m² 342.72
sloof beton bertulang (200kg+begesting) m² 144.16
kolom praktis 15x15 + begesting m² 65.71
kolom struktur 20x20 +begesting m² 220.192
tangga + begesting m² 93.418
bordes+ begesting m² 7.73
balok 20/30 m² 6.26
Plat lantai m² 55.68

D PEKERJAAN DINDING
1. Lantai 1 m²
Pasang trasram (1pc:3ps) m² 35.2
pasang dinding (1pc:6ps) m² 801.39
plesteran halus (1pc:2ps) m² 24.042
acian m² 16.03
2. lantai 2 m²
Pasang trasram (1pc:3ps) m² 208.36
pasang dinding (1pc:6ps) m² 1247.43
plesteran halus (1pc:2ps) m² 37.43
acian m² 24.96
3. Lantai 3 m²
Pasang trasram (1pc:3ps) m² 31.7
pasang dinding (1pc:6ps) m² 286.87
plesteran halus (1pc:2ps) m² 8.61
acian m² 5.47

E PEKERJAAN KAYU
1. Lantai 1
kusen pintu/jendela kayu jati
a. model P1 m² 0.38
b. model P3 m² 0.28
c. model J2 m² 0.58
d. model J3 m² 0.68
e. model J4 m² 0.06
Daun pintu m²
a. model P1 m² 20
b. model P3 m² 9.6
jendela kaca m²
a. Model J2 m² 9.01
b. Model J3 m² 24.85
c. model J4 m² 0.23
2. Lantai 2 m²
kusen pintu/jendela kayu jati m²
a. Model P1 m² 0.038
b. model P3 m² 0.621
c. Model P2 m² 0.635
d. Model Pj m² 0.92
e.model J2 m² 1.5
f. Model J1 m² 0.15
g. Model J4 m² 0.54
h. Model Pj m² 0.76
Daun Pintu m²
a. Model P1 m² 2
b. Model PJ m² 43.2
c. Model P2 m² 25.2
d. Model P3 m² 21.6
Kaca Jendela m²
a. Model J2 m² 23.17
b. Model J1 m² 1.72
c. Model J4 m² 2.06
d. Model PJ m² 9.15
3 . Lantai 3 m²
kusen pintu/jendela kayu jati m²
a. Model P2 m² 0.07
b. Model P3 m² 0.069
c. Model p4 m² 0.042
d. Model J3 m² 0.82
e. model J4 m² 0.06
Daun Pintu m²
a. Model P2 m² 2.8
b. Model P3 m² 2.4
c. Model P4 m² 3.2
Kaca Jendela m²
a. Model J3 m² 29.82
b. Model J4 m² 0.23

F PKERJAAN PLAFOND
1. Lantai 1 m²
pasang plafond gypsum 9mm m² 464
pasang lis plafond m² 164.1
2. Lantai 2 m²
pasang plafond gypsum 9mm m² 172
pasang lis plafond m² 144.9
3. Lantai 3 m²
pasang plafond gypsum 9mm m² 176
pasang lis plafond m² 51.4

G PEKERJAAN SANITASI
1. Lantai 1 m²
kloset duduk porselen m² 8
pemasangan kran air m² 8
pemasangan bak cuci piring stainless m² 2
pemasangan pipa air bersih 3" m² 1
pemasangan pipa air kotor 4" m² 1
sumur resapan m² 1
septic tank m² 1
2. Lantai 2 m²
kloset duduk porselen m² 18
pemasangan kran air m² 26
pemasangan pipa air bersih 3" m² 1
pemasangan pipa air kotor 4" m² 1
3. Lantai 3 m²
kloset duduk porselen m² 2
pemasangan kran air m² 4
pemasangan bak cuci piring stainless m² 2
pemasangan pipa air bersih 3" m² 1
pemasangan pipa air kotor 4" m² 1

H PEKERJAAN LANTAI
1. Lantai 1 m²
keramik (40x40) m² 393.8
keramik (20x20) m² 29.88
2. Lantai 2 m²
keramik (40x40) m² 371.97
keramik (20x20) m² 25.58
3. Lantai 3 m²
keramik (40x40) m² 155.46
keramik (20x20) m² 5.21
I PEKERJAAN KUNCI
1. Lantai 1
pemasangan kunci pintu ruang m² 8
pemasangan pintu kamar mandi m² 8
pemasangan engsel kuningan untuk jendela m² 28
pemasangan engsel kuningan untuk pintu m² 28
pemasangan grendel pintu m² 36
2. Lantai 2 m²
pemasangan kunci pintu ruang m² 35
pemasangan pintu kamar mandi m² 18
pemasangan engsel kuningan untuk jendela m² 146
pemasangan engsel kuningan untuk pintu m² 110
pemasangan grendel pintu m² 110
3. Lantai 3 m²
pemasangan kunci pintu ruang m² 1
pemasangan pintu kamar mandi m² 4
pemasangan engsel kuningan untuk jendela m² 16
pemasangan engsel kuningan untuk pintu m² 10
pemasangan grendel pintu m² 16

J PEKERJAAN INSTALASI LISTRIK


1.Lantai 1
titik pemasangan lampu m² 1
pemasangaan stopkontak m² 19
pemasangan saklar ganda m² 6
pemasangan sakalar tunggal m² 13
2. Lantai 2 m²
titik pemasangan lampu m² 1
pemasangaan stopkontak m² 36
pemasangan saklar ganda m² 38
pemasangan sakalar tunggal m² 19
3. Lantai 3 m²
titik pemasangan lampu m² 1
pemasangaan stopkontak m² 3
pemasangan saklar ganda m² 2
pemasangan sakalar tunggal m² 3

K PEKERJAAN ATAP
1. Lantai 2 m²
pemasangan genteng m² 167.56
2. Lantai 3 m²
Pemasangan genteng m² 208.06

L PEKERJAAN FINISHING
1. lantai 1 m²
pengecatan dinding m² 1744
pengecatan plafond m² 464
2. lantai 2 m²
pengecatan dinding m² 1239.34
pengecatan plafond m² 472
3. Lantai 3 m²
pengecatan dinding m² 286.87
pengecatan plafond m² 176
JUMLAH RAB
ANGGARAN BIAYA
HARGA
SATUAN JUMLAH HARGA TOTAL HARGA

Rp 7,950 Rp 4,770,000 Rp 27,391,758


Rp 96,450 Rp 96,354
Rp 1,501,694 Rp 22,525,404

Rp 77,250 Rp 25,898,063 Rp 236,275,836


Rp 82,200 Rp 6,444,480
Rp 30,900 Rp 345,462
Rp 39,030 Rp 655,704
Rp 702,732 Rp 31,412,120
Rp 1,106,414 Rp 136,005,941
Rp 203,100 Rp 35,514,066

Rp 898,407 Rp 5,031,078 Rp 1,745,357,441


Rp 4,519,009 Rp 1,548,754,764
Rp 1,041,037 Rp 150,075,836
Rp 81,402 Rp 5,348,899
Rp 86,560 Rp 19,059,820
Rp 109,641 Rp 10,242,406
Rp 94,839 Rp 733,102
Rp 96,757 Rp 605,696
Rp 98,884 Rp 5,505,839

Rp 269,907 Rp 9,500,733 Rp 678,080,378


Rp 255,797 Rp 204,993,318
Rp 65,764 Rp 1,581,090
Rp 36,890 Rp 591,347

Rp 269,907 Rp 56,237,864
Rp 255,797 Rp 319,089,101
Rp 65,764 Rp 2,461,535
Rp 36,890 Rp 920,774

Rp 269,907 Rp 8,556,058
Rp 255,797 Rp 73,380,543
Rp 65,764 Rp 566,225
Rp 36,890 Rp 201,788

Rp 23,465,670 Rp 8,916,955 Rp 3,709,015,025


Rp 23,465,670 Rp 6,570,388
Rp 23,465,670 Rp 13,610,089
Rp 23,465,670 Rp 15,956,656
Rp 23,465,670 Rp 1,407,940

Rp 25,307,390 Rp 506,147,800
Rp 25,307,390 Rp 242,950,944

Rp 2,259,762 Rp 20,360,452
Rp 2,259,762 Rp 56,155,076
Rp 2,259,762 Rp 519,745

Rp 23,465,670 Rp 891,695
Rp 23,465,670 Rp 14,572,181
Rp 23,465,670 Rp 14,900,700
Rp 23,465,670 Rp 21,588,416
Rp 23,465,670 Rp 35,198,505
Rp 23,465,670 Rp 3,519,851
Rp 23,465,670 Rp 12,671,462
Rp 23,465,670 Rp 17,833,909

Rp 25,307,390 Rp 50,614,780
Rp 25,307,390 Rp 1,093,279,248
Rp 25,307,390 Rp 637,746,228
Rp 25,307,390 Rp 546,639,624

Rp 2,259,762 Rp 52,358,676
Rp 2,259,762 Rp 3,886,790
Rp 2,259,762 Rp 4,655,109
Rp 2,259,762 Rp 20,676,819

Rp 23,465,670 Rp 1,642,597
Rp 23,465,670 Rp 1,619,131
Rp 23,465,670 Rp 985,558
Rp 23,465,670 Rp 19,241,849
Rp 23,465,670 Rp 1,407,940
Rp 25,307,390 Rp 70,860,692
Rp 25,307,390 Rp 60,737,736
Rp 25,307,390 Rp 80,983,648

Rp 2,259,762 Rp 67,386,091
Rp 2,259,762 Rp 519,745

Rp 43,108 Rp 20,002,112 Rp 50,279,610


Rp 42,386 Rp 6,955,543

Rp 43,108 Rp 7,414,576
Rp 42,386 Rp 6,141,731

Rp 43,108 Rp 7,587,008
Rp 42,386 Rp 2,178,640

Rp 2,911,200 Rp 23,289,600 Rp 88,282,256


Rp 69,050 Rp 552,400
Rp 887,399 Rp 1,774,797
Rp 21,540 Rp 21,540
Rp 22,260 Rp 22,260
Rp 304,201 Rp 304,201
Rp 159,561 Rp 159,561

Rp 2,911,200 Rp 52,401,600
Rp 69,050 Rp 1,795,300
Rp 21,540 Rp 21,540
Rp 22,260 Rp 22,260

Rp 2,911,200 Rp 5,822,400
Rp 69,050 Rp 276,200
Rp 887,399 Rp 1,774,797
Rp 21,540 Rp 21,540
Rp 22,260 Rp 22,260

Rp 176,525 Rp 69,515,466 Rp 173,325,770


Rp 176,460 Rp 5,272,625
Rp 176,525 Rp 65,661,930
Rp 176,460 Rp 4,513,847

Rp 176,525 Rp 27,442,545
Rp 176,460 Rp 919,357

Rp 175,190 Rp 1,401,520 Rp 30,451,340


Rp 111,190 Rp 889,520
Rp 32,650 Rp 914,200
Rp 57,975 Rp 1,623,300
Rp 28,540 Rp 1,027,440

Rp 175,190 Rp 6,131,650
Rp 111,190 Rp 2,001,420
Rp 32,650 Rp 4,766,900
Rp 57,975 Rp 6,377,250
Rp 28,540 Rp 3,139,400

Rp 175,190 Rp 175,190
Rp 111,190 Rp 444,760
Rp 32,650 Rp 522,400
Rp 57,975 Rp 579,750
Rp 28,540 Rp 456,640

Rp 192,449 Rp 192,449 Rp 29,240,162


Rp 212,402 Rp 4,035,644
Rp 212,402 Rp 1,274,414
Rp 187,799 Rp 2,441,391
Rp -
Rp 192,449 Rp 192,449
Rp 212,402 Rp 7,646,483
Rp 212,402 Rp 8,071,287
Rp 187,799 Rp 3,568,187

Rp 192,449 Rp 192,449
Rp 212,402 Rp 637,207
Rp 212,402 Rp 424,805
Rp 187,799 Rp 563,398

Rp 20,403 Rp 3,418,727 Rp 7,663,775


Rp 20,403 Rp 4,245,048

Rp 34,873 Rp 60,818,512 Rp 142,045,529


Rp 25,183 Rp 11,684,912

Rp 34,873 Rp 43,219,504
Rp 25,183 Rp 11,886,376

Rp 34,873 Rp 10,004,018
Rp 25,183 Rp 4,432,208
AB Rp 6,917,408,879
REKAPITULASI RAB
Gedung Fakultas Psikologi UIN Ar-Raniry
Lokasi : Banda Aceh
NO NAMA PEKERJAAN JUMLAH HARGA

A PEKERJAAN PRSIAPAN Rp 27,391,758


B PEKERJAAN TANAH Rp 236,275,836
C PEKERJAAN BETON & PEMBESIAN Rp 1,745,357,441
D PEKERJAAN DINDING Rp 678,080,378
E PEKERJAAN KAYU Rp 3,709,015,025
F PKERJAAN PLAFOND Rp 50,279,610
G PEKERJAAN SANITASI Rp 88,282,256
H PEKERJAAN LANTAI Rp 173,325,770
I PEKERJAAN KUNCI Rp 30,451,340
J PEKERJAAN INSTALASI LISTRIK Rp 29,240,162
K PEKERJAAN ATAP Rp 7,663,775
L PEKERJAAN FINISHING Rp 142,045,529
TOTAL Rp 6,917,408,879
PEMBULATAN Rp 6,917,408,000
PPN 10% Rp 691,740,800
NILAI PROYEK Rp 7,609,148,800
Harga Permeter Persegi Rp 3,843,005
LB 1800
PPN 10%
TIME SCHEDULE

WAKTU BOBOT BULAN 1


NO NAMA PEKERJAAN
HARI 1
1 PEKERJAAN PERSIAPAN 7 0.396 0.339
2 PEKERJAAN TANAH 9 3.4157
3 PEKERJAAN BETON & PEMBESIAN 36 25.231
4 PEKERJAAN DINDING 18 9.8025
5 PEKERJAAN KAYU 14 53.619
6 PEKERJAAN PLAFOND 12 0.7269
7 PEKERJAAN SANITASI 8 1.2762
8 PEKERJAAN LANTAI 15 2.5056
9 PEKERJAAN KUNCI 5 0.4402
10 PEKERJAAN LISTRIK 5 0.4227
11 PEKERJAAN ATAP 9 0.1108
12 PEKERJAAN FINSHING 6 2.0534
JUMLAH 144 100
RENCANA TIAP MINGGU 0.339
RENCANA KOMULATIF 0.339
BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
0.06
1.9 1.518
1.402 4.205 4.205 4.205 4.205 4.205 2.803
1.089 3.27 3.27 2.178
7.66 22.979 22.979
0.363 0.363
0.957 0.32
0.67

1.95 2.92 4.205 4.205 4.205 4.205 4.205 3.893 3.27 3.27 9.838 22.979 22.979 0.363 0.363 0.957 0.99
2.29 5.213 9.419 13.62 17.83 22 26.24 30.13 33.4 36.7 46.51 69.485 92.464 92.83 93.19 94.15 95.1
BULAN 5 BULAN 6
19 20 21 22 23 24 1 1 1 1 1 1

1 0.835
0.088 0.352
0.169 0.25
0.04 0.074
2.053

1 0.923 0.521 0.29 0.074 2.053


96.14 97.06 97.58 97.9 97.95 100
1 1 1
Nilai Proyek Rp 6,917,408,000
PPN10% Rp 691,740,800
Total Proyek Rp 7,609,148,800

Pajak PPh 2% Rp 138,348,160


PPN 10 Rp 691,740,800
Profit 10% Rp 760,914,880
Sisa 78% Rp 6,018,144,960

TERMIN PENCAIRAN DANA PRESENTASI KERJA


DP 20% 0%
T1 30% 55%
T2 30% 85%
T3 15% 100%
T4 0% 0%
RETENSI 5% PERAWATAN
TOTAL

CASHFLOW

Cash Inflow
presentasi
progress
no Cashflow Nilai
saldo
1 DP Rp 1,521,829,760
2 Termin Rp 4,945,946,720
3 Pinjaman Rp 1,801,000,000
Jumlah Rp 8,268,776,480

Cash Outflow
1 PPN 10% Rp 795,501,920
2 PPh 2% Rp 117,595,936
3 Operasional Proyek Rp 6,018,144,960
4 Pengembalian Pinjaman Rp 1,801,000,000
Jumlah Rp 8,732,242,816
Inflow-Outflow -Rp 463,466,336
sisa
Rp 7,470,800,640
Rp 6,779,059,840
Rp 6,018,144,960
operasional proyek

NILAI
Rp 1,521,829,760 Rp 138,348,160 Rp 27,669,632
Rp 2,282,744,640 Rp 207,522,240 Rp 41,504,448
Rp 2,282,744,640 Rp 207,522,240 Rp 20,752,224
Rp 1,141,372,320 Rp 103,761,120 Rp 20,752,224
Rp - Rp 7,609,148,800 Rp - Rp -
Rp 380,457,440 Rp 34,587,040 Rp 6,917,408
Rp 7,609,148,800 Rp 691,740,800 Rp 117,595,936

BULAN 1

1 2 3 4
0.34% 1.95% 2.92% 4.21%
0.34% 2.29% 5.21% 9.42%

Rp 1,335,350,275 Rp 1,217,996,448 Rp 1,042,266,616


Rp 1,521,829,760

Rp 1,521,829,760 Rp 1,335,350,275 Rp 1,217,996,448 Rp 1,042,266,616

1 2 3 4
Rp 138,348,160
Rp 27,669,632
Rp 20,461,692.86 Rp 117,353,826.72 Rp 175,729,832.83 Rp 253,363,902.82

Rp 186,479,485 Rp 117,353,827 Rp 175,729,833 Rp 253,363,903


Rp 1,335,350,275 Rp 1,217,996,448 Rp 1,042,266,616 Rp 788,902,713
Rp 7,609,148,800 Rp 6,467,776,480

BULAN 2

5 6 7 8
4.21% 4.21% 4.21% 4.21%
13.63% 17.84% 22.05% 26.26%

Rp 788,902,713 Rp 685,538,810 Rp 682,174,907 Rp 678,811,004

Rp 150,000,000 Rp 250,000,000 Rp 250,000,000


Rp 938,902,713 Rp 935,538,810 Rp 932,174,907 Rp 678,811,004

5 6 7 8
Rp 207,522,240
Rp 41,504,448
Rp 253,363,902.82 Rp 253,363,902.82 Rp 253,363,902.82 Rp 253,363,902.82
Rp 650,000,000
Rp 253,363,903 Rp 253,363,903 Rp 253,363,903 Rp 1,152,390,591
Rp 685,538,810 Rp 682,174,907 Rp 678,811,004 -Rp 473,579,586
BULAN 3

9 10 11 12
3.89% 3.27% 3.27% 9.84%
30.15% 33.42% 36.69% 46.53%

-Rp 473,579,586 -Rp 707,685,425 -Rp 904,478,766 -Rp 901,272,106

Rp 200,000,000 Rp 570,000,000
-Rp 473,579,586 -Rp 707,685,425 -Rp 704,478,766 -Rp 331,272,106

9 10 11 12

Rp 234,105,838.94 Rp 196,793,340.19 Rp 196,793,340.19 Rp 592,185,464.06

Rp 234,105,839 Rp 196,793,340 Rp 196,793,340 Rp 592,185,464


-Rp 707,685,425 -Rp 904,478,766 -Rp 901,272,106 -Rp 923,457,570
BULAN 4

13 14 15 16
22.98% 22.98% 0.36% 0.36%
69.51% 92.49% 92.85% 93.21%

-Rp 923,457,570 -Rp 226,957,106 Rp 470,543,358 Rp 470,878,037

Rp 2,282,744,640 Rp 2,282,744,640
Rp 25,000,000 Rp 26,000,000 Rp 22,000,000 Rp 22,000,000
Rp 1,384,287,070 Rp 2,081,787,534 Rp 492,543,358 Rp 492,878,037

13 14 15 16
Rp 207,522,240 Rp 207,522,240
Rp 20,752,224 Rp 20,752,224
Rp 1,382,969,711.81 Rp 1,382,969,711.81 Rp 21,665,321.86 Rp 21,665,321.86

Rp 1,611,244,176 Rp 1,611,244,176 Rp 21,665,322 Rp 21,665,322


-Rp 226,957,106 Rp 470,543,358 Rp 470,878,037 Rp 471,212,715
BULAN 5

17 18 19 20
0.96% 0.99% 1% 0.92%
94.17% 95.16% 96.16% 97.08%

Rp 471,212,715 Rp 470,438,523 Rp 470,858,888 Rp 470,677,438

Rp 57,000,000 Rp 60,000,000 Rp 60,000,000 Rp 56,000,000


Rp 528,212,715 Rp 530,438,523 Rp 530,858,888 Rp 526,677,438

17 18 19 20

Rp 57,774,191.62 Rp 59,579,635.10 Rp 60,181,449.60 Rp 55,366,933.63

Rp 57,774,192 Rp 59,579,635 Rp 60,181,450 Rp 55,366,934


Rp 470,438,523 Rp 470,858,888 Rp 470,677,438 Rp 471,310,505
BULAN 6

21 22 23 24
0.52% 0.29% 0.07% 2.04%
97.60% 97.89% 97.96% 100.00%

Rp 471,310,505 Rp 471,016,151 Rp 470,563,531 Rp 471,350,829

Rp -
Rp 31,000,000 Rp 17,000,000 Rp 5,000,000
Rp 502,310,505 Rp 488,016,151 Rp 475,563,531 Rp 471,350,829

21 22 23 24
Rp -
Rp -
Rp 31,294,353.79 Rp 17,452,620.38 Rp 4,212,701.47 Rp 122,770,157.18
Rp 1,151,000,000
Rp 31,294,354 Rp 17,452,620 Rp 4,212,701 Rp 1,273,770,157
Rp 471,016,151 Rp 470,563,531 Rp 471,350,829 -Rp 802,419,328
BULAN 12

-Rp 802,419,328

Rp 380,457,440

-Rp 421,961,888

1
Rp 34,587,040
Rp 6,917,408
Rp -

Rp 41,504,448
-Rp 463,466,336