Anda di halaman 1dari 16

NO PEKERJAAN VOLUME SATUAN

1. GALIAN 11.76 m³
2. PASIR URUG 0.294 m³
3. BATU KOSONG 0.588 m³
4. BATU KALI 4.3953 m³
5. TIMBUNAN 6.4827 m³
6. SLOOF 0.2646 m³
7. BALOK 0.1264 m³
8. KOLOM 0.6075 m³
9. PAS. BATA 35.28 m²
10. PLESTERAN 70.56 m²
HARGA SATUAN UPAH DAN BAHAN
NO Tenaga Kerja satuan harga satuan (Rp)
1 Kepala Tukang OH Rp 175,000.00
2 Pekerja OH Rp 160,000.00
3 Mandor OH Rp 225,000.00
4 Tukang batu OH Rp 160,000.00
5 Tukang kayu OH Rp 160,000.00
6 Tukang besi OH Rp 160,000.00

NO jenis bahan Satuan harga satuan (Rp)


1 Batu Belah 15/20 cm m³ Rp 275,000.00
2 Pasir Urug m³ Rp 350,000.00
Portland Cement (PC) tiga roda
3 kilo Rp 2,500.00
50kg
4 Pasir Pasang m³ Rp 450,000.00
5 Papan Kayu Kelas III m³ Rp 2,280,000.00
6 Paku 5 cm - 12 cm kg Rp 20,000.00
7 Minyak Bekisting Liter Rp 20,000.00
9 Besi Beton polos ∅ 8 kg Rp 38,000.00
10 Kawat Beton kg Rp 20,000.00
11 Kerikil m³ Rp 320,000.00
12 Kayu Kelas II Balok m³ Rp 2,580,000.00
13 Plywood 122x244 tb. 9mm Lmbr Rp 95,000.00
14 Dolken Kayu Btng Rp 15,000.00
15 Batu Bata merah bj Rp 1,200.00
HAN
keterangan

keterangan
ANALISA HARGA BAHAN
NO. URAIAN PEKERJAAN SAT KOEF
a b c d
PEKERJAAN TANAH
1 m³ Pek. Galian Tanah Keras
1
Pondasi
Pekerja OH 1.000
Mandor OH 0.032
JUMLAH
1 m³ Pek. Urugan Tanah
2
Kembali
Pekerja OH 0.333
Mandor OH 0.011
JUMLAH

PEKERJAAN PONDASI
1 m³ Urugan Pasir di Bawah
1
Pondasi (t = … cm)
Pasir Urug m³ 1.200
Pekerja OH 0.300
Mandor OH 0.010
JUMLAH
1 m³ Pasangan Batu Kosong (t
2
= … cm)
Batu Belah 15/20 cm m³ 1.200
Pasir Urug m³ 0.432
Tukang OH 0.390
Kepala Tukang OH 0.039
Pekerja OH 0.780
Mandor OH 0.039
JUMLAH
1 m³ Pekerjaan Pondasi Batu
3
Kali Camp. 1 : 4
Batu Belah 15/20 cm m³ 1.200
Portland Cement (PC) kg 163.00
Pasir Pasang m³ 0.520
Tukang OH 0.750
Kepala Tukang OH 0.075
Pekerja OH 1.500
Mandor OH 0.075
JUMLAH

NO. URAIAN PEKERJAAN SAT KOEF


a b c d
IV PEKERJAAN BETON BERTULANG
1 m³ Pekerjaan Sloof Beton 15
1 / 20 cm (200 kg besi +
Bekisting)
Kayu Kelas III m³ 0.270
Paku 5 cm - 12 cm kg 2.000
Minyak Bekisting Liter 0.600
Besi Beton Polos / Ulir kg 210.000
Besi Beton ∅ 10 kg 82.100
Besi Beton ∅ 8 kg 49.900
Kawat Beton kg 3.000
Portland Cement (PC) kg 336.000
Pasir Pasang m³ 0.540
Kerikil m³ 0.810
Pekerja OH 5.650
Tukang Batu OH 0.275
Tukang Kayu OH 0.156
Tukang Besi OH 1.400
Kepala Tukang OH 0.323
Mandor OH 0.283
JUMLAH
1 m³ Kolom Beton 15 x 15 cm
2
(200 kg Besi + Bekisting)
Kayu Kelas III m³ 0.400
Paku 5 cm - 12 cm kg 4.000
Minyak Bekisting Liter 0.600
Besi Beton Polos / Ulir kg 210.000
Besi Beton ∅ 10 kg 109.441
Besi Beton ∅ 8 kg 51.300
Kawat Beton kg 4.500
Portland Cement (PC) kg 336.000
Pasir Pasang m³ 0.540
Kerikil m³ 0.810
Kayu Kelas II Balok m³ 0.150
Plywood 9 mm Lmbr 3.500
Dolken Kayu Btng 20.000
Pekerja OH 7.050
Tukang Batu OH 0.275
Tukang Kayu OH 0.156
Tukang Besi OH 1.400
Kepala Tukang OH 0.323
Mandor OH 0.283
JUMLAH
1 m³ Ring Balok Beton 15 / 20
3
cm
Kayu Kelas III m³ 0.320
Paku 5 cm - 12 cm kg 3.200
Minyak Bekisting Liter 1.600
Besi Beton Polos / Ulir kg 210.000
Besi Beton ∅ 10 kg 82.100
Besi Beton ∅ 8 kg 49.900
Kawat Beton kg 3.000
Portland Cement (PC) kg 336.000
Pasir Pasang m³ 0.540
Kerikil m³ 0.810
Kayu Kelas II Balok m³ 0.180
Plywood 9 mm Lmbr 2.800
Dolken Kayu Btng 16.000
Pekerja OH 6.350
Tukang Batu OH 0.275
Tukang Kayu OH 1.650
Tukang Besi OH 1.400
Kepala Tukang OH 0.333
Mandor OH 0.318
JUMLAH

PEKERJAAN DINDING
1 m² Pasangan Dinding Bata
1
Merah tebal ½ Bata Camp 1 : 4
Batu Bata bh 70.000
Portland Cement (PC) kg 11.500
Pasir Pasang m³ 0.043
Pekerja OH 0.300
Tukang OH 0.100
Kepala Tukang OH 0.010
Mandor OH 0.015
JUMLAH
1 m² Plesteran Dinding Camp.
2
1 : 5 (t = 15 mm)
Portland Cement (PC) kg 5.184
Pasir Pasang m³ 0.026
Pekerja OH 0.300
Tukang OH 0.150
Kepala Tukang OH 0.015
Mandor OH 0.015
JUMLAH
RGA BAHAN
HARGA (Rp.) JUMLAH (Rp.)
e f

160,000.00 160,000.00
225,000.00 7,200.00
JUMLAH 167,200.00

160,000.00 53,333.33
225,000.00 2,400.00
JUMLAH 55,733.33

350,000.00 420,000.00
160,000.00 48,000.00
225,000.00 2,250.00
JUMLAH 470,250.00

275,000.00 330,000.00
350,000.00 151,200.00
160,000.00 62,400.00
175,000.00 6,825.00
160,000.00 124,800.00
225,000.00 8,775.00
JUMLAH 684,000.00

275,000.00 330,000.00
2,500.00 407,500.00
450,000.00 234,000.00
160,000.00 120,000.00
175,000.00 13,125.00
160,000.00 240,000.00
225,000.00 16,875.00
JUMLAH 1,361,500.00

HARGA (Rp.) JUMLAH (Rp.)


e f

2,280,000.00 615,600.00
20,000.00 40,000.00
20,000.00 12,000.00
0.00
45,000.00 3,694,500.00
38,000.00 1,896,200.00
20,000.00 60,000.00
2,500.00 840,000.00
450,000.00 243,000.00
320,000.00 259,200.00
160,000.00 904,000.00
160,000.00 44,000.00
160,000.00 24,960.00
160,000.00 224,000.00
175,000.00 56,525.00
225,000.00 63,675.00
JUMLAH 8,977,660.00

2,280,000.00 912,000.00
20,000.00 80,000.00
20,000.00 12,000.00
0.00
45,000.00 4,924,845.00
38,000.00 1,949,400.00
20,000.00 90,000.00
2,500.00 840,000.00
450,000.00 243,000.00
320,000.00 259,200.00
2,580,000.00 387,000.00
95,000.00 332,500.00
15,000.00 300,000.00
160,000.00 1,128,000.00
160,000.00 44,000.00
160,000.00 24,960.00
160,000.00 224,000.00
175,000.00 56,525.00
225,000.00 63,675.00
JUMLAH 11,871,105.00

2,280,000.00 729,600.00
20,000.00 64,000.00
20,000.00 32,000.00
0.00
45,000.00 3,694,500.00
38,000.00 1,896,200.00
20,000.00 60,000.00
2,500.00 840,000.00
450,000.00 243,000.00
320,000.00 259,200.00
2,580,000.00 464,400.00
95,000.00 266,000.00
15,000.00 240,000.00
160,000.00 1,016,000.00
160,000.00 44,000.00
160,000.00 264,000.00
160,000.00 224,000.00
175,000.00 58,275.00
225,000.00 71,550.00
JUMLAH 10,466,725.00

1,200.00 84,000.00
2,500.00 28,750.00
450,000.00 19,350.00
160,000.00 48,000.00
160,000.00 16,000.00
175,000.00 1,750.00
225,000.00 3,375.00
JUMLAH 201,225.00

2,500.00 12,960.00
450,000.00 11,700.00
160,000.00 48,000.00
160,000.00 24,000.00
175,000.00 2,625.00
225,000.00 3,375.00
JUMLAH 102,660.00
REKAPITULASI KEBUTUHAN BAHAN
PAGAR BETON
JUMLAH
NO. URAIAN PEKERJAAN SATUAN
MATERIAL
PEMASANGAN BATU KALI, 1 PC : 4 PS
1 Batu Belah 15/20 cm m³ 5,184
2 Semen (PC) kg 704,16
3 Pasir Pasang m³ 22,464

PEMASANGAN PONDASI BATU KOSONG


1 Batu belah 15/20 cm m³ 3,072
2 Pasir pasang m³ 13,3312

URUGAN PASIR
1 Pasir Urug m³ 1,536

PAS. BATA 1/2 BATA, 1 PC : 5 PS


1 Bata Merah bj 7.616
2 Semen kg 1.053,184
3 Pasir Pasang m³ 4,896

PLESTERAN 1 PC : 5 PS, TEBAL 15 mm


1 Semen (PC) kg 1.327,104
2 Pasir Pasang m³ 6,656

PEMBUATAN SLOOF BERTULANG (700 KG BESI + BEKISTING)


1 Kayu Kelas III m³ 0,648
2 Paku 5 cm - 12 cm kg 4,8
3 Minyak Bekisting Liter 1,44
4 Besi Beton uk. 24 kg 504
5 Kawat Beton kg 7,2
6 Semen (PC) kg 806,4
7 Pasir Beton m³ 1,296
8 Kerikil Beton m³ 1,944

PEMBUATAN BALOK BETON BERTULANG (200 KG BESI + BEKISTING )


1 Kayu Kelas III m³ 1,104
2 Paku 5 cm - 12 cm kg 7,68
3 Minyak Bekisting Liter 3,84
4 Besi Beton uk. 24 kg 504
5 Kawat Beton kg 7,2
6 Semen (PC) kg 806,4
7 Pasir Beton m³ 1,296
8 Kerikil Beton m³ 1,944
9 Multipleks 9 mm lmbr 6,72
10 Bambu Btg 38,4

PEMBUATAN KOLOM BETON BERTULANG (150 KG + BEKISTING)


1 Kayu Kelas III m³ 0,8128
2 Paku 5 cm - 12 cm kg 3,1556
3 Minyak Bekisting Liter 4,0162
4 Kawat Beton kg 4,3031
5 Besi Beton kg 301,318
6 Semen (PC) kg 642,6
7 Pasir Beton m³ 1,0327
8 Kerikil Beton m³ 1,5491
9 Multipleks 9 mm lmbr 6,6937
10 Bambu Btg 38,25
BAHAN

JUMLAH KESELURUHAN
KETERANGAN
NO. MATERIAL
PC : 4 PS 1 Batu Belah Pondasi 15/20 cm
2 Semen (PC)
3 Pasir Pasang
4 Pasir Urug
5 Bata Merah
KOSONG 6 Kayu Kelas III
7 Paku 5 cm - 12 cm
8 Minyak Bekisting
9 Besi Beton uk. 24
10 Kawat Beton
11 Pasir Beton
12 Kerikil Beton
5 PS 13 Multipleks 9 mm
14 Bambu

15 mm

BESI + BEKISTING)

KG BESI + BEKISTING )
150 KG + BEKISTING)
RUHAN
TOTAL
8,256
5.339,848
15.1296
1,536
7.616
2,564
15,63
9,3
1.309,2
18,7
3,624
5,43
13,41
76,65
RANCANGAN ANGGARAN BIAYA
NO. URAIAN PEKERJAAN SATUAN
I. PEKERJAAN PONDASI
1. Galian Tanah Pondasi m³
2. Pondasi Pasangan Batu Kali m³
3. Urugan Tanah Kembali m³
4. Pasangan Batu Kosong m³
5. Urugan Pasir m³

II. PEKERJAAN BETON BERTULANG


Sloof Ukuran 10 10 m³
2. Balok Ukuran 15 15 m³
3. Kolom Ukuran 15 20 m³

III. PEKERJAAN DINDING


1. Pasangan Dinding Bata 1pc : 5ps m²
2. Plesteran Pasangan Dinding Bata 1pc : 5ps m²

No. URAIAN PEKERJAAN HARGA


1 Pekerjaan Pondasi 8,852,220.93
2 Pekerjaan Beton Bertulang 10,910,179.16
3 Pekerjaan Dinding 14,342,907.60
TOTAL :
NCANGAN ANGGARAN BIAYA
VOLUME HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
I. PEKERJAAN PONDASI
11.76 167,200.00 1,966,272.00
4.3953 1,361,500.00 5,984,200.95
6.483 55,733.33 361,302.48
0.588 684,000.00 402,192.00
0.294 470,250.00 138,253.50
TOTAL : 8,852,220.93
EKERJAAN BETON BERTULANG
0.2646 8,977,660.00 2,375,488.84
0.1264 10,466,725.00 1,322,994.04
0.6075 11,871,105.00 7,211,696.29
TOTAL : 10,910,179.16
III. PEKERJAAN DINDING
35.28 201,225.00 7,099,218.00
70.56 102,660.00 7,243,689.60
TOTAL : 14,342,907.60

HARGA
8,852,220.93
10,910,179.16
14,342,907.60
34,105,307.69