1 Pekerjaan beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c 0.12 m3
= 0,58
Portland Cement 44.52 kg 1,000
Pasir beton ( kg ) 83.76 kg 107
koral beton kg 125.64 kg 119
Air 25.8 Liter 2,000
Pekerja 0.2 OH
Tukang batu 0.03 OH
Kepala tukang 0 OH
Mandor 0.01 OH
1 Pekerjaan beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c 0.11 m3
= 0,58
Portland Cement 42.29 kg 1,000
Pasir beton ( kg ) 79.57 kg 107
koral beton kg 119.36 kg 119
Air 24.51 Liter 2,000
Pekerja 0.19 OH
Tukang batu 0.03 OH
Kepala tukang 0 OH
Mandor 0.01 OH
433.659
44,520
8,962
14,951
51,600
25,000 5,000
39,500 1,185
42,500 -
50,000 500
405.441
42,290 -
8,514 -
14,204 -
49,020 -
25,000 - 4,750
39,500 - 1,185
42,500 - -
50,000 - 500