H Bahan Kaca
M.07001 Jendela nako + rangka uk. 20x70x0.5 cm bh 143,440.00
M.07006 Kaca tebal 5 mm m2 77,600.00
M.07010 Kaca tempered 10 mm m2 685,000.00
J Bahan Pipa
M.09001 Pipa baja dia 63 mm BSP sch 40 m 85,833.33
M.09002 Pipa baja dia 100 mm BSP sch 40 m 253,166.67
M.09093 Pipa PVC 1/2" Rucika m 10,550.00
M.09094 Pipa PVC 3/4" Rucika m 15,150.00
M.09095 Pipa PVC 1" Rucika m 18,400.00
M.09096 Pipa PVC 1 1/2" Rucika m 32,250.00
M.09099 Pipa PVC 3" Rucika m 93,875.00
M.09100 Pipa PVC 4" Rucika m 145,075.00
M.09134 Gate Valve dia. 3/4" Rucika bh 181,800.00
M.09135 Gate Valve dia. 1 1/4" Rucika bh 212,800.00
J Bahan Sanitair
M.10001 Bak cuci piring 1 lubang Royal SB 35 stainless unit 275,000.00
M.10004 Closet duduk TOTO, CW421J/SW420JP unit 4,760,000.00
M.10005 Closet jongkok TOTO, CE6 unit 628,000.00
M.10006 Floor drain San Ei HN508P unit 379,000.00
M.10008 Kran air TOTO, T23B13 bh 301,000.00
M.10011 Urinoir TOTO, U57 unit 4,182,000.00
M.10012 Wastafel lengkap kran TOTO, LW103JT1 unit 2,161,000.00
M.10013 Sekat urinoir TOTO, AW115J unit 1,630,000.00
M.10014 Waterdrain bh 350,000.00
M.10015 Shower Spray (Jet Washer) TOTO, THX20NB bh 311,000.00
M.10017 Kran leher angsa Soligen Sink WS4 bh 93,500.00
M.10020 Cermin 1000 x 1500 Asahi bh 490,000.00
M.10021 Septic Tank Biotech Kap. 10 M3 (Biosung) Type RCX – 10 unit 7,409,000.00
M.10022 Water Tank Stainless Steel PENGUIN TBSK 2000 Ltr STAINLESS STEEL unit 4,740,000.00
N Bahan Elektrikal
M.14001 Kabel listrik NYM 3x2.5 mm Eterna m1 17,000.00
M.14007 Saklar tunggal Broco bh 10,500.00
M.14008 Saklar seri Broco bh 15,000.00
M.14010 Stop kontak Broco bh 12,100.00
M.14015 Lampu TL 18 watt Philips bh 13,500.00
M.14017 Lampu Down Light SL 25 watt Philips bh 93,000.00
M.14020 Armatur lampu downlight SL Philips bh 59,000.00
M.14021 Armatur lampu TL inbow RM 2x Lokal bh 265,000.00
M.14025 Terminal kabel bh 3,000.00
M.14027 Pipa listrik 5/8 PVC m1 3,000.00
M.14034 MCCB-3P 18 ka Schneider 50A bh 141,100.00
M.14035 MCB-1P 6 ka Schneider 10A bh 42,000.00
M.14036 Pilot Lamp bh 14,300.00
M.14037 Fuse bh 13,500.00
M.14038 Cu Bar bh 189,000.00
M.14039 Bok Panel ukuran 50 X 30 X 25 cm bh 635,000.00
M.14040 Kabel NYY 4 x 50 mm² Eterna m 314,000.00
M.14041 Kabel NYA 6 mm Eterna m 10,800.00
M.14042 Kabel NYY 4 x 6 mm² Eterna m 40,540.00
M.14043 Kabel NYA 4 mm Eterna m 6,210.00
M.14044 Pemasangan PLN 33000 VA lot 38,319,000.00
M.14045 MCCB-3P 18 ka Schneider 20A bh 235,000.00
M.14046 Kabel NYY 4 x 16 mm² Eterna m 59,000.00
M.14047 Splitzen Q 3/4 50 cm full tembaga unit 94,500.00
M.14048 Klem bh 3,500.00
M.14049 Kabel NYA 50 mm Eterna m 85,320.00
M.14050 Pipa Gip medium Ø 3/4" (Rucika) m 83,264.00
M.14051 Box Test Link bh 187,000.00
M Sewa Peralatan
M.15006 Sewa crane 5-10 ton hari 1,330,000.00
M.15007 Sewa excavator type 225 kap 0.5-1.0 m3 hari 1,120,000.00
M.15008 Sewa wheel loader hari 1,820,000.00
M.15009 Sewa dump truk hari 500,000.00
M.15010 Sewa motor grader hari 2,380,000.00
M.15012 Sewa vibro roller hari 910,000.00
M.15013 Sewa water tanker hari 1,085,000.00
M.15015 Sewa mesin bor dia. Hingga 100 cm hari 1,526,400.00
M.15016 Sewa casing pelindung bored pile hari 1,500,000.00
M.15020 Sewa mesin las listrik jam 12,500.00
M.15029 Excavator (Standar) jam 450,000.00
N Bahan Bakar dan Pelumas
M.16001 Bahan bakar Solar industri, non subsidi liter 10,700.00
M.16002 Minyak bekisting liter 2,000.00
M.16003 Minyak pelumas liter 34,000.00
KODE URAIAN SPESIFIKASI SATUAN HARGA SATUAN
O Lain-Lain
M.17001 Air liter 250.00
M.17022 Lambang Dinas Bahan Aluminium Fin. Stiker Set 5,035,000.00
M.17023 Huruf Timbul Aluminium t= 22cm buah 275,000.00
M.17024 Huruf Timbul Aluminium t= 16cm buah 200,000.00
M.17025 Alumunium Motif Batik m2 450,000.00
M.17026 Pagar Besi dan kelengkapannya m2 813,764.00
M.17027 PemasanganTiang Bendera unit 6,811,941.15
R Tanaman / Vegetasi
M.18001 Rumput Gajah Mini m2 35,000.00
S Item Tambahan
M.19001 Karung plastik/bagor 25 kg m 2,000.00
M.19002 Tali Rafia m 1,000.00
M.19003 Screen Bar (Saringan Air) bh 40,500.00
M.19004 Manhole plat baja 50 cm x 50 cm bh 1,250,000.00
M.19005 Kran Taman bh 33,750.00
DAFTAR ANALISA PEKERJAAN
A.3.2.1.12. Penggalian 1 m3 pondasi bored pile dengan mesin, diameter hingga 100 cm 109,770.67
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Operator alat berat L.018 OH 0.0200 138,426.16 2,768.52
Pembantu Operator L.019 OH 0.0200 118,426.16 2,368.52
Mandor L.017 OH 0.1190 138,426.16 16,472.71
Jumlah Harga Tenaga Kerja 21,609.76
B Bahan
Bahan bakar Solar M.16001 liter 0.4500 10,700.00 4,815.00
Minyak pelumas M.16003 liter 0.2500 34,000.00 8,500.00
Jumlah Harga Bahan 13,315.00
C Peralatan
Sewa mesin bor M.15015 hari 0.0200 1,526,400.00 30,528.00
Sewa casing pelindung bored pile M.15016 hari 0.0200 1,500,000.00 30,000.00
Jumlah Harga Peralatan 60,528.00
D Jumlah (A+B+C) 95,452.76
E Overhead + Profit (Contoh 15%) 15% xD 14,317.91
F Harga Satuan Pekerjaan (D+E) 109,770.67
HARGA SATUAN PEKERJAAN BETON
A.4.1.1.4. Membuat 1 m3 beton untuk lantai kerja (bedding) 763,849.22
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.001 OH 1.2000 108,426.16 130,111.39
Tukang Batu L.003 OH 0.2000 118,426.16 23,685.23
Kepala Tukang L.016 OH 0.0200 118,426.16 2,368.52
Mandor L.017 OH 0.0600 138,426.16 8,305.57
Jumlah Harga Tenaga Kerja 164,470.72
B Bahan
Semen Portland M.01042 kg 230.0000 962.00 221,260.00
Pasir beton M.01034 kg 893.0000 152.17 135,884.83
Batu pecah mesin 2/3 M.01029 kg 1027.0000 90.17 92,601.17
Air M.17001 liter 200.0000 250.00 50,000.00
Jumlah Harga Bahan 499,746.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 664,216.72
E Overhead + Profit (Contoh 15%) 15% xD 99,632.51
F Harga Satuan Pekerjaan (D+E) 763,849.22
A.4.1.1.5. Membuat 1 m3 beton mutu f'c = 14,5 MPa (K175), slump (12+2) cm, w/c = 0,66 922,375.70
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.001 OH 1.6500 108,426.16 178,903.16
Tukang Batu L.003 OH 0.2750 118,426.16 32,567.19
Kepala Tukang L.016 OH 0.0280 118,426.16 3,315.93
Mandor L.017 OH 0.0830 138,426.16 11,489.37
Jumlah Harga Tenaga Kerja 226,275.66
B Bahan
Semen Portland M.01042 kg 326.0000 962.00 313,612.00
Pasir beton M.01034 kg 760.0000 152.17 115,646.67
Batu pecah mesin 2/3 M.01029 kg 1029.0000 90.17 92,781.50
Air M.17001 liter 215.0000 250.00 53,750.00
Jumlah Harga Bahan 575,790.17
C Peralatan
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 802,065.83
E Overhead + Profit (Contoh 15%) 15% xD 120,309.87
F Harga Satuan Pekerjaan (D+E) 922,375.70
A.4.1.1.41. Pengecoran 1 m3 beton readymix K300 (f'c=26.4 Mpa) tanpa pompa 1,457,077.11
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.001 OH 1.0000 108,426.16 108,426.16
Tukang Batu L.003 OH 0.2500 118,426.16 29,606.54
Kepala Tukang L.016 OH 0.0250 118,426.16 2,960.65
Mandor L.017 OH 0.1000 138,426.16 13,842.62
Jumlah Harga Tenaga Kerja 154,835.97
B Bahan
Beton Readymix K300 M.01019 m3 1.0200 1,090,380.00 1,112,187.60
Jumlah Harga Bahan 1,112,187.60
C Peralatan
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 1,267,023.57
E Overhead + Profit (Contoh 15%) 15% xD 190,053.54
F Harga Satuan Pekerjaan (D+E) 1,457,077.11
A.4.1.1.41a. Pengecoran 1 m3 beton readymix K350 (f'c=26.4 Mpa) tanpa pompa 1,223,087.07
Harga Satuan Jumlah
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A Tenaga Kerja
Pekerja L.001 OH 1.0000 108,426.16 108,426.16
Tukang Batu L.003 OH 0.2500 118,426.16 29,606.54
Kepala Tukang L.016 OH 0.0250 118,426.16 2,960.65
Mandor L.017 OH 0.1000 138,426.16 13,842.62
Jumlah Harga Tenaga Kerja 154,835.97
B Bahan
Beton Readymix K350 M.01020 m3 1.0200 890,900.00 908,718.00
Jumlah Harga Bahan 908,718.00
C Peralatan
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 1,063,553.97
E Overhead + Profit (Contoh 15%) 15% xD 159,533.10
F Harga Satuan Pekerjaan (D+E) 1,223,087.07
A. FASILITAS PENUNJANG
1 Listrik Bln 6.00 2,000,000.00 12,000,000.00
2 Air Kerja Bln 6.00 1,000,000.00 6,000,000.00
TOTAL ( Rp ) : 18,000,000.00
MOBILISASI DAN DEMOBILISASI
A. PERALATAN
1 Periksa Lembaran 1.2.2 Ls 1.00 9,150,000.00 9,150,000.00
B. FASILITAS DIREKSI
1 Sewa Kendaraan Roda 4 (1500 cc Th. 2019) Bln 6.00 6,500,000.00 39,000,000.00
2 Sewa Kendaraan Roda 2 (150 cc Th. 2019) Bln 6.00 750,000.00 4,500,000.00
C. MOBILISASI LAINNYA
C.I. PEKERJAAN DARURAT
1 Penerapan K3 (APD)
- Peralatan P3K Ls 1.00 2,500,000.00 2,500,000.00
- Helm Proyek Bh 30.00 100,000.00 3,000,000.00
- Sepatu Safety Bh 30.00 200,000.00 6,000,000.00
- Rompi Pekerja Bh 30.00 50,000.00 1,500,000.00
- Sarung Tangan Bh 30.00 12,000.00 360,000.00
- Pelindung Mata Bh 30.00 60,000.00 1,800,000.00
- Jaring Pengaman m2 200.00 7,500.00 1,500,000.00
- APAR Bh 1.00 400,000.00 400,000.00
2 Penerangan Area Proyek Set 1.00 6,500,000.00 6,500,000.00
3 CCTV On Site (4 Kamera) Set 1.00 8,000,000.00 8,000,000.00
4 Sewa Drone (1 set x 3 Kali) Kali 3.00 1,000,000.00 3,000,000.00
C.II. PENGUKURAN DAN PENGGAMBARAN
1 Pengukuran dan Penggambaran m2 1,100.00 25,000.00 27,500,000.00
D SOSIALISASI
Biaya Sosialisasi & Publikasi Ls 1.00 15,000,000.00 15,000,000.00
E DEMOBILISASI
Demobilisasi Kali 1.00 9,150,000.00 9,150,000.00
TOTAL ( Rp ) : 138,860,000.00
MOBILISASI DAN DEMOBILISASI ALAT
Lembaran : 1.2.2
KODE HARGA JUMLAH
No. JENIS ALAT SATUAN VOL.
ALAT SATUAN HARGA
B. PERALATAN
1 EXCAVATOR 80-140 HP Unit 1 5,000,000.00 5,000,000.00
2 BAR CUTTER Unit 1 150,000.00 150,000.00
3 BAR BENDER Unit 1 150,000.00 150,000.00
4 POMPA AIR JET PUMP Unit 1 600,000.00 600,000.00
5 THEODOLITE Unit 1 100,000.00 100,000.00
6 BORE PILE KOMPLITE Unit 1 2,500,000.00 2,500,000.00
7 STAMPER Unit 1 150,000.00 150,000.00
8 MOLEN / MIXER Unit 1 250,000.00 250,000.00
9 COMPRESOR Unit 1 150,000.00 150,000.00
10 CONCRETE VIBRATOR Unit 1 100,000.00 100,000.00
2.16
PEKERJAAN PONDASI
A.3.2.1.3. Pemasangan pondasi batu belah campuran 1SP : 5PP m3 753,734.67
A.3.2.1.9. Pemasangan batu kosong (anstamping) m3 409,944.46
A.3.2.1.12. Penggalian pondasi bored pile dengan mesin, diameter hingga 100 cm m3 109,770.67