ENGINEERING ESTIMATE ( EE )
PEKERJAAN : REHABILITASI GEDUNG KANTOR BENGLAT, DISTRIK NAVIGASI KELAS III PONTIANAK
LOKASI : SIANTAN HILIR, PONTIANAK UTARA, KOTA PONTIANAK
THN. ANGGARAN : 2020
JUMLAH TOTAL
NO. URAIAN PEKERJAAN
(Rp)
1 2 3
I. GEDUNG BENGLAT
A. PEKERJAAN PERSIAPAN 11,350,000.00
B. PEKERJAAN STRUKTUR BETON BERTULANG 29,535,926.34
C. PEKERJAAN PASANGAN & PLESTERAN LT. 2 10,643,351.61
D. PEKERJAAN LANTAI DAN DINDING LT. 2 56,688,079.17
F. PEKERJAAN LANGIT-LANGIT (PLAFOND) LT. 2 10,917,808.05
G. PEKERJAAN PINTU & JENDELA LT. 2 6,271,571.70
H. PEKERJAAN PENGECATAN LT. 1 & 2 40,557,024.31
I. PEKERJAAN SANITASI DALAM GEDUNG LT. 1 & 2 11,546,940.38
J. PEKERJAAN INSTALASI ELEKTRIKAL 1,322,000.00
K. PEKERJAAN LAIN-LAIN 3,000,000.00
TERBILANG :
DUA RATUS JUTA RUPIAH
Disetujui :
PPK
Pejabat Pembuat Komitmen
................................................
NIP. ....................................
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)
PEKERJAAN : REHABILITASI GEDUNG KANTOR BENGLAT, DISTRIK NAVIGASI KELAS III PONTIANAK
LOKASI : SIANTAN HILIR, PONTIANAK UTARA, KOTA PONTIANAK
THN. ANGGARAN : 2020
I. GEDUNG BENGLAT
A. PEKERJAAN PERSIAPAN
1 Direksi Keet - 1.00 Lsm 5,000,000.00 5,000,000.00
2 Plank Nama Proyek - 1.00 Lsm 350,000.00 350,000.00
3 Pek. Pembersihan & Pembongkaran - 1.00 Lsm 3,500,000.00 3,500,000.00
4 Foto Dokumentasi & Pelaporan - 1.00 Lsm 2,500,000.00 2,500,000.00
J. PEKERJAAN LAIN-LAIN
1 Exhaust fan lengkap dengan instalasi + Aksesoris - 4.00 Unit 750,000.00 3,000,000.00
JUMLAH TOTAL
NO. URAIAN PEKERJAAN
(Rp)
1 2 3
GEDUNG VTS
A. PEKERJAAN PERSIAPAN 9,850,000.00
B. PEKERJAAN LANTAI V ( AREA TOWER ) 14,268,894.32
C. RUANG KONTROL UTAMA 17,669,921.08
D. RUANG DAPUR (LANTAI III) 16,398,228.08
E. PEKERJAAN (LANTAI I, II, & III) 89,728,100.21
G. PEKERJAAN LAIN-LAIN 5,700,000.00
TERBILANG :
DUA RATUS JUTA RUPIAH
Disetujui :
PPK
Pejabat Pembuat Komitmen
................................................
NIP. ....................................
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)
KEGIATAN : REHABILITASI GEDUNG VTS, DISTRIK NAVIGASI KELAS III PONTIANAK
LOKASI : SIANTAN HILIR, PONTIANAK UTARA, KOTA PONTIANAK
THN. ANGGARAN : 2020
I. GEDUNG VTS
A. PEKERJAAN PERSIAPAN
1 Direksi Keet - 1.00 Lsm 5,000,000.00 5,000,000.00
2 Plank Nama Proyek - 1.00 Lsm 350,000.00 350,000.00
3 Pekerjaan Pembersihan & Pembongkaran - 1.00 Lsm 2,000,000.00 2,000,000.00
4 Foto dokumentasi & Pelaporan - 1.00 Lsm 2,500,000.00 2,500,000.00
9,850,000.00
Pekerjaan Plesteran
1 Acian dak A.4.4.2.27 17.25 M2 47,581.25 820,776.56
Pekerjaan Pengecatan
1 Pengecatan Rangka Tower A.4.7.1.16 82.33 M2 41,213.13 3,393,109.55
2 Pengecatan Pagar A.4.7.1.16 16.47 M2 41,213.13 678,621.91
3 Pengecatan Tangga Control A.4.7.1.16 2.68 M2 41,213.13 110,644.88
4 Pengecatan dinding luar A.4.7.1.10.b 90.00 M2 55,664.03 5,009,762.25
5 Waterproofing - 21.00 M2 90,500.00 1,900,500.00
14,268,894.32
Pekerjaan Pengecatan
1 Pengecatan Plafond A.4.7.1.10.a 59.56 M2 49,684.03 2,959,180.53
17,669,921.08
Pekerjaan Pengecatan
1 Pengecatan Plafond A.4.7.1.10.a 9.00 M2 49,684.03 447,156.23
2 Pengecatan dinding dalam (Interior) A.4.7.1.10.a 43.11 M2 49,684.03 2,141,878.32
Pekerjaan Lain-lain
1 Pembuatan Kitchen set ( 6 m ) - 6.00 M 2,124,000.00 12,744,000.00
-Dengan matrial dasar multiplek , design minimalis , dan finising dgn HPL
16,398,228.08
Pekerjaan Pengecatan
1 Pengecatan dinding dalam (interior) A.4.7.1.10.a 169.56 M2 49,684.03 8,424,423.28
2 Pengecatan dinding luar (exterior) A.4.7.1.10.b 120.27 M2 55,664.03 6,694,712.29
3 Pengecatan Plafond A.4.7.1.10.a 18.00 M2 49,684.03 894,312.45
89,728,100.21
KODE Harga Satuan Jumlah Harga
No PEKERJAAN ANALISA Volume Satuan
( Rp. ) ( Rp. )
H. PEKERJAAN MUSHOLA
1 Pengikisan/pengerokan permukaan cat lama A.4.7.1.3 155.00 M2 20,441.25 3,168,393.75
2 Perbaikan Atap (Tempat whudu) - 1.00 Lsm 1,500,000.00 1,500,000.00
3 Pengecatan dinding dalam (interior) A.4.7.1.10.a 125.50 M2 49,684.03 6,235,345.14
4 Pengecatan dinding luar (exterior) A.4.7.1.10.b 155.00 M2 55,664.03 8,627,923.88
5 Pemasangan Pintu Geser Alumunium + Aksesoris - 2.00 Unit 4,350,000.00 8,700,000.00
28,231,662.76
G. PEKERJAAN LAIN-LAIN
1 Pemasangan Neon Box Uk. 2 x 1 m + Instalasi & Aksesoris - 1.00 Unit 5,700,000.00 5,700,000.00
5,700,000.00
PERHITUNGAN VOLUME
I GEDUNG VTS
A PEKERJAAN PERSIAPAN
1 Direksi Keet 10.00
2 Pembersihan Lokasi 1.00
3 Pengukuran dan Pemasangan Bowplank 1.00
4 Plang Nama Proyek 1.00
Pekerjaan Plesteran
###
Acian dak 18.00 - 0.75 17.25
Pekerjaan Pengecatan
###
Pengecatan Rangka Tower 82.33
###
Pengecatan Pagar 2" = 0.24 x ( 51.00 + 18.00 ) 16.47
###
Pengecatan Tangga Control 2" = 0.24 x 11.25 2.68
###
Pengecatan dinding luar 18.00 + 36.00 + 20.00 + 16.00 90.00
###
Waterproofing 6.00 x 3.00 + 15.00 x 0.20 21.00
Pekerjaan Pengecatan
###
Pengecatan Plafond 75.76 - 16.20 59.56
D RUANG DAPUR
Pekerjaan Pendahuluan
###
Pengikisan/pengerokan permukaan cat lama 52.11
###
Foto Dokumentasi
Pekerjaan Pengecatan
###
Pengecatan Plafond 9.00 + 0.00 9.00
###
Pengecatan dinding dalam (Interior) 36.00 + 9.75 - 2.64 43.11
Pekerjaan Lain-lain
###
Pembuatan Kitchen set ( 6 m ) 3.00 + 3.00 6.00
-Dengan matrial dasar multiplek , design minimalis , dan finising dgn HPL
Type J.1
###
- Kunci Slot 2.00 x 3.00 6.00
###
- Engsel Jendela 2.00 x 3.00 6.00
###
- Handle 1.00 x 3.00 3.00
###
- Kait Angin 2.00 x 3.00 6.00
Pekerjaan Pengecatan
###
Pengecatan dinding dalam (interior) 108.00 + 72.00 - 4.80 - 1.80 - 3.84 169.56
###
Pengecatan dinding luar (exterior) 13.79 x 9.00 - 3.84 120.27
###
Pengecatan Plafond 9.00 x 3.00 - 9.00 18.00
G PEKERJAAN LAIN-LAIN
###
Neon Box (VTS Pontianak) 1.00
###
Foto dokumentasi 1.00
ACP 50.82 + 10.74 61.56
Cat Pelapis Batu Alam 61.56
II GEDUNG BENOLAT
PEKERJAAN PERSIAPAN
###
Direksi Keet 1.00
###
Plank Nama Proyek 1.00
###
Pekerjaan Pembongkaran 1.00
###
List/Cornis Gypsum Profil Plafond 13.70 + 19.70 + 20.00 53.40
PEKERJAAN LAIN-LAIN
###
Exhaust fan lengkap dengan instalasi + Aksesoris
###
Waterproofing (Dak beton)
###
Pengadaan Gorden Vertical blind Blackout + Aksesoris 7.28 x 3.00 21.83
DATA PERHITUNGAN VOLUME
TANGGA LUAR (BENGLAT)
Pekerjaan
Lokasi
Item Pekerjaan : Pembesian Tangga
Mata Pembayaran : Kg
Rencana
Panjang Jumlah Total Total
No. Sketsa / Bentuk Potongan (Dimensi dalam cm) Dia. / Jarak Berat KETERANGAN
Potongan Potongan Panjang Berat
( mm - cm ) (m) ( btg. ) (m) ( kg/m' ) ( kg )
15
5
a
35
Φ 10 - 20 1.10 6.00 6.60 0.617 4.07 Beugel Luar Plat I
95
b Φ 8 - 20 1.05 12.00 12.60 0.395 4.97 Beugel A/B Plat I
5 5
36
5
a
23
Φ 8 - 20 0.69 18.00 12.42 0.395 4.90 Beugel Anak Tangga
95
b Φ 8 - 20 1.05 18.00 18.90 0.395 7.46 Beugel Dalam Atas
5 5
Anak tangga
568
b Φ 10 - 20 5.78 12.00 69.36 0.617 42.77 Tulangan lantai
5 5
Tangga
95
b Φ 10 - 20 1.05 58.80 61.74 0.617 38.07 Tulangan Pembagi
5 5
Tangga
95
5
Φ 8 - 20 2.16 22.00 47.52 0.395 18.75 Beugel Plat II
8
5 195 5
d Φ 10 - 20 2.05 22.00 45.10 0.617 27.81 Tulangan Pembagi
Atas/bawah
195
5
Φ 8 - 20 4.16 12.00 49.92 0.395 19.70 Beugel Plat III
8
5 95 5
d Φ 10 - 20 1.05 22.00 23.10 0.617 14.25 Tulangan Pembagi
Atas/bawah
TOTAL
TOTAL 182.76
STANDAR HARGA SATUAN DASAR UPAH
A. UPAH
1 Pekerja Org/hari L. 01 105,000.00
2 Tukang Gali / Batu / Tembok / Kayu /Besi / Cat / Pipa / Cor / Semen / Listr Org/hari L. 02 125,000.00
3 Kepala Tukang Org/hari L. 03 145,000.00
4 Mandor Org/hari L. 04 155,000.00
5 Ahli alat berat (mekanik) Org/hari L. 07 125,000.00
6 Operator Alat Berat Org/hari L. 08 170,000.00
7 Pembantu Operator Org/hari L. 09 100,000.00
8 Supir Truk Org/hari L. 10 115,000.00
9 Kenek truk Org/hari L. 11 80,000.00
B. BAHAN PENGISI
1 Batu Kong M³ 300,000.00
2 Batu Sap Pinang M³ 320,000.00
3 Batu pecah 15-20 cm M³ 335,000.00
4 Batu pecah 10-15 cm M³ 350,000.00
5 Batu pecah 3-5 cm M³ 405,000.00
6 Batu pecah 2-3 cm M³ 435,000.00
7 Batu pecah 1-2 cm M³ 475,000.00
8 Batu pecah 0,5-1 cm M³ 500,000.00
9 Stone Dust M³ 350,000.00
10 Aspal Kg 13,790.00
11 Aspal Emulsi (Teak Coat) Kg 14,175.00
12 Aspal Emulsi (Prime Coat) Kg 14,175.00
13 Aspal Sealent Kg 36,000.00
14 Pasir Kasar M³ 125,000.00
15 Pasir Halus M³ 125,000.00
16 Semen PC Zak 75,000.00
17 Semen PC Kg 1,500.00
18 Tanah Ex. Peniraman M³ 190,000.00
19 Tanah Pilihan (Paladis) M³ 284,000.00
20 Paving Block Bh 3,750.00
21 Paving Stone Persegi Panjang (21 x 10,5 x 8) Bh 2,650.00
22 Paving Stone Persegi Panjang (21 x 10,5 x 10) Bh 3,750.00
23 Paving Stone Segi 5 (21 x 30 x 6) Bh 4,200.00
24 Paving Stone Diamond (Segi 6, 18 x 10.5 x 7 ) Bh 3,250.00
25 Batu Bata 5 x 11 x 22cm Bh 2,000.00
26 Bataco 15 x 30 x 7 cm Bh 1,800.00
27 Bataco 20 x 40 x 9 cm ( press ) Bh 2,500.00
28 Bataco 20 x 40 x 7 cm ( press ) Bh 2,300.00
29 Bata Ringan 20 x 60 x 10 Bh 18,000.00
30 Kerawang ( roster ) 18 x 18 cm Bh 20,000.00
31 Kerawang press ( roster ) 30 x 30 cm Bh 60,500.00
32 Keramik 20 x 20 cm Polished ex Roman Kotak 86,500.00
33 Keramik 20 x 20 cm Unpolished ex Roman Kotak 98,000.00
34 Keramik 30 x 30 cm Polished ex Roman Kotak 100,000.00
35 Keramik 30 x 30 cm Unpolished ex Roman Kotak 100,000.00
36 Keramik 40 x 40 cm Polished ex Roman Kotak 110,000.00
37 Keramik 40 x 40 cm Unpolished ex Roman Kotak 110,000.00
38 Keramik 30 x 60 cm Polished (setaraf Indogress) Kotak 250,000.00
39 Keramik 30 x 60 cm Unpolished (setaraf Indogress) Kotak 250,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
C. BAHAN KAYU
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ 11,805,000.00
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ 11,700,000.00
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ 8,950,000.00
4 Ky. Belian tdk ketam Uk. 8/16 - 4 M M³ 8,750,000.00
5 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ 9,567,900.00
6 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ 10,000,000.00
7 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ 13,020,900.00
8 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ 10,416,700.00
9 Ky. Belian tdk ketam Uk. 5/10 - 4 M M³ 11,500,000.00
10 Ky. Belian ketam Uk. 6/6 - 4 M M³ 12,800,000.00
11 Ky. Belian ketam Uk. 7/7 - 4 M M³ 12,500,000.00
12 Ky. Belian ketam Uk. 8/8 - 4 M M³ 11,015,700.00
13 Ky. Belian ketam Uk. 5/10 - 4 M M³ 11,000,000.00
14 Ky. Belian ketam Uk. 4/8 - 4 M M³ 11,718,750.00
15 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ 7,421,875.00
16 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ 7,500,000.00
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ 7,800,000.00
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ 7,840,000.00
19 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam ) M³ 9,050,000.00
20 Kusen Ky Belian uk. 5/10 Meter 120,000.00
21 Kusen Ky Kelas I Bangkirai uk. 5/10 Meter 80,000.00
22 Kusen Ky Kelas II uk. 5/10 Meter 65,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
D. BAHAN CAT
1 Amplas Lbr 4,000.00
2 Minyak cat Kg 36,000.00
3 Cat kilat setara Dulux Kg 70,000.00
4 Cat kilat setara Avian Kg 70,000.00
5 Plamur Kg 31,500.00
6 Cat Dasar Alkali Kg 140,000.00
7 Cat Akhir Interior setara Dulux Kg 104,000.00
8 Cat Akhir Eksterior (weather shield) setara Dulux Kg 115,000.00
9 Cat Dasar setara Mowilex Kg 70,000.00
10 Cat Akhir Interior setara Mowilex Kg 100,000.00
11 Cat Akhir Eksterior (weather shield) setara Mowilex Kg 120,000.00
12 Cat Dasar setara Vinilex Kg 27,000.00
13 Cat Akhir Interior setara Vinilex Kg 28,000.00
14 Cat seng (Zinc Chromate) Kg 44,000.00
15 Plitur Kg 64,000.00
16 Thiner Ltr 25,000.00
17 Melamic Ltr 67,000.00
18 Vernis Ltr 45,000.00
19 Meni Kg 52,000.00
20 Oker / Semen Warna Kg 14,000.00
21 Lem Kayu Kg 20,000.00
22 Sealent Kg 107,700.00
23 Soda Api Kg 25,000.00
24 Sabun / cream pembersih kotoran Kg 15,700.00
25 Teak Oil Ltr 60,000.00
26 Ter / Residu Ltr 58,400.00
27 Kuas 4" Bh 25,000.00
28 Cat Marka (non Thermoplas) Kg 65,000.00
29 Cat Marka (Thermoplastic) Kg 95,000.00
30 Cat Kansteen (ex. Matex) Kg 53,750.00
31 Cat Trotoar (ex. Tenokote) Kg 41,250.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
F. BAHAN PENGGANTUNG
1 Pintu PVC untuk WC Bh 266,000.00
2 Kait angin Bh 14,400.00
3 Handle Jendela Bh 15,400.00
4 Handle Pintu Bh 170,000.00
5 Engsel jendela Bh 18,800.00
6 Engsel pintu Bh 29,000.00
7 Slot pintu Bh 18,900.00
8 Slot jendela Bh 8,800.00
9 Kunci tanam 2 slag (setaraf Belluci) Bh 180,000.00
10 Kunci tanam 1 slag Besar Bh 230,000.00
11 Kunci tanam 1 slag Kecil Bh 150,000.00
12 Kunci silinder Bh 78,800.00
13 Door Closer Bh 250,000.00
14 Door Stoper Bh 88,750.00
15 Paku Seng Kg 35,000.00
16 Paku campuran 1" - 5 " Kg 23,000.00
17 Paku beton Kg 40,000.00
18 Paku triplek Kg 25,000.00
19 Paku GRC Kg 25,000.00
20 Paku Zincalum Kg 10,700.00
21 Paku Onduline Bh 1,300.00
22 Sekrup Onduline Bh 1,500.00
23 Sekrup Gibsum Kg 60,000.00
24 Sekrup Fixer Bh 2,500.00
25 Sekrup Steel Sheet uk. 5 x 15 mm Bh 300.00
26 Sekrup Steel Sheet uk. 5 x 25 mm Bh 300.00
27 Sekrup Steel Sheet uk. 5 x 35 mm Bh 400.00
28 Sekrup Steel Sheet uk. 5 x 45 mm Bh 500.00
29 Sekrup Steel Sheet uk. 5 x 50 mm Bh 500.00
30 Sekrup Steel Sheet uk. 5 x 55 mm Bh 600.00
31 Sekrup Steel Sheet uk. 5 x 65 mm Bh 700.00
32 Sekrup Ulir Kayu Bh 700.00
33 Paku asbes Bh 600.00
34 Sekrup Zincalume Bh 500.00
35 Pintu Tempered Polos 12 mm - uk. 87 x 213,5 cm Unit 5,500,000.00
36 Pintu Alumunium + Engsel Tanam - uk. 90 x 215 cm Unit 775,000.00
37 Pintu Alumunium + Engsel Kupu-kupu - uk. 90 x 215 cm Unit 700,000.00
38 Jendela Casement - uk. 60 x 120 cm (Lengkap - Tanpa Kaca) Unit 800,000.00
G. BAHAN ATAP
1 Sirap belian Lbr 5,300.00
2 Asbes Lbr 57,200.00
3 Eternit M² 68,400.00
4 Genteng Metal Type Permata 0.30 Lbr 63,000.00
5 Genteng Metal Type Prima 0.30 Lbr 66,600.00
6 Genteng Metal Type Royal 0.30 Lbr 66,600.00
7 Genteng Metal Type Classic 0.30 Lbr 66,600.00
8 Genteng Metal Type Permata 0.25 Lbr 51,800.00
9 Genteng Metal Type Classic 0.25 Lbr 51,800.00
10 Genteng Metal Type Royal 0.25 Lbr 51,800.00
11 Atap Genteng Onduline Transparan 2 x 0,95 m Lbr 275,000.00
12 Atap Genteng Onduline Warna 2 x 0,95 m (merah,hijau,coklat & hitam) Lbr 173,000.00
13 Atap Genteng Onduline Warna 2 x 0,95 m (Biru /Premium) Lbr 200,000.00
14 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (merah,hijau,coklat & hitam) Lbr 59,000.00
15 Atap Genteng Onduvilla Warna 1,06 x 0,4 m (teracota 3D & florentino) Lbr 54,000.00
16 Perabung Onduline Warna 90 x 50 cm (merah, coklat, hijau & hitam) Lbr 100,000.00
17 Perabung Onduline Warna 90 x 50 cm (biru/premium) Lbr 110,000.00
18 Perabung Onduline Warna 90 x 50 cm (florentino) Lbr 110,000.00
19 Siku Onduline Warna 110 x 40 cm (merah,coklat,hijau & hitam) Lbr 93,000.00
20 Apron Piece Onduvilla 102 x 14 cm Lbr 89,500.00
21 Verge Piece Onduline/Onduvilla 104 x 10,5 cm tinggi 11,4 cm Lbr 89,500.00
22 Onduband M 57,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
86 Nok/Prabung Steel Sheet 0.45 lebar 500 mm (biru, merah, hijau muda) M 46,200.00
H. BAHAN KACA
1 Kaca Polos, t = 3 mm M² 150,000.00
2 Kaca Polos, t = 5 mm M² 200,000.00
3 Kaca Polos, t = 8 mm M² 398,000.00
4 Kaca Polos, t = 12 mm M² 640,000.00
5 Kaca Rayben, t = 3 mm M² 200,000.00
6 Kaca Rayben, t = 5 mm M² 200,000.00
7 Kaca Rayben, t = 8 mm M² 550,000.00
8 Kaca Rayben, t = 12 mm M² 900,000.00
9 Kaca Cermin t = 3 mm M² 275,000.00
10 Kaca Cermin t = 5 mm M² 418,000.00
11 Kaca Repsol, t = 5 mm M² 550,000.00
12 Sealent Kg 35,000.00
13 Nako + Bingkai (80 x 15) x 10 daun polos Bh 400,000.00
14 Nako + Bingkai (80 x 15) x 10 daun rayben Bh 469,000.00
15 Kaca Es, t = 3 mm M² 275,000.00
16 Kaca Es, t = 5 mm M² 267,500.00
17 Kaca Raindown, t = 5 mm M² 550,000.00
I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr 70,000.00
5 Teakwood t = 3 mm Lbr 140,000.00
6 Formika t = 0,03 mm Lbr 115,000.00
7 Multiplex t = 6 mm Lbr 111,000.00
8 Multiplex t = 9 mm Lbr 220,000.00
9 Multiplex t = 10 mm Lbr 278,000.00
10 Multiplek t = 12 mm Lbr 282,000.00
11 Plywood 4' x 8' x 4mm Lbr 120,000.00
12 Panel GRC 120 x 240 x 40 Lbr 79,700.00
13 GypsumBoard t = 9 mm Lbr 74,600.00
14 Super Plank 10 x 240 x 9 cm Lbr 65,000.00
15 Super Plank 20 x 240 x 9 cm Lbr 70,000.00
16 Super Plank 30 x 240 x 9 cm Lbr 110,000.00
J. BAHAN SANITASI
1 Wastafel setara Toto Bh 1,000,000.00
2 Kloset duduk monoblok Bh 2,962,700.00
3 Kloset duduk putih (setaraf TOTO) Bh 2,246,800.00
4 Kloset duduk warna (setaraf TOTO) Bh 2,500,000.00
5 Kloset jongkok (setaraf TOTO) Bh 330,000.00
6 Kloset jongkok (setaraf INA) Bh 200,000.00
7 Urinoir setaraf Toto Unit 2,000,000.00
8 Bak air fibreglass uk. 55x55x60 cm Bh 300,000.00
9 Shower Spray setara Toto Unit 350,000.00
10 Sliding rail setara Toto Unit 500,000.00
11 Floordrain stainless steel setara Toto Bh 400,000.00
12 Floordrain PVC Bh 35,000.00
13 Tempat Sabun Setara Toto Bh 120,000.00
14 Kran zink setara Toto Bh 307,000.00
15 Kitchenzink stainless steel 1 lubang Unit 650,000.00
16 Kran dinding setara Toto Bh 150,000.00
17 Kran air uk 1/2" Bh 32,500.00
18 Pipa PVC dia 1/2" AW ex Wavin Btg 23,400.00
19 Pipa PVC dia 3/4" AW ex Wavin Btg 32,500.00
20 Pipa PVC dia 1" AW ex Wavin Btg 44,400.00
21 Pipa PVC dia 2" AW ex Wavin Btg 100,000.00
22 Pipa PVC dia 3" AW ex Wavin Btg 203,500.00
23 Pipa PVC dia 4" AW ex Wavin Btg 335,500.00
24 Pipa PVC dia 8" AW ex Wavin Btg 1,306,800.00
25 Pipa PVC dia 3/4" D ex Wavin Btg 23,500.00
26 Pipa PVC dia 1" D ex Wavin Btg 30,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
L. BATU ALAM
1 Batu Andesit Ukuran 10 x 20 cm M² 170,000.00
2 Batu Andesit Ukuran 15 x 30 cm M² 200,000.00
3 Batu Andesit Ukuran 20 x 40 cm M² 230,000.00
4 Batu Andesit Ukuran 30 x 60 cm M² 260,000.00
5 Batu Candi Ukuran 10 x 20 cm M² 170,000.00
6 Batu Candi Ukuran 15 x 30 cm M² 200,000.00
7 Batu Candi Ukuran 20 x 40 cm M² 220,000.00
8 Batu Pacitoroso Ukuran 10 x 20 cm M² 190,000.00
9 Batu Pacitoroso Ukuran 15 x 30 cm M² 220,000.00
10 Batu Pacitoroso Ukuran 20 x 40 cm M² 250,000.00
11 Batu Bali Green Ukuran 10 x 20 cm M² 180,000.00
12 Batu Bali Green Ukuran 15 x 30 cm M² 200,000.00
13 Batu Bali Green Ukuran 20 x 40 cm M² 220,000.00
14 Batu Prasasti Peresmian (batu hitam) ukuran 40 x 60 buah 2,400,000.00
15 Batu Prasasti Peresmian (batu hitam) ukuran 60 x 80 buah 4,800,000.00
16 Batu Koral (batu taman) kg 14,000.00
17 Batu Granit Ukuran Lebar 60 cm M² 1,300,000.00
91 Box Time Swich ( Lengkap pipa optic 1,5 +Klem + Kunci ) Set 2,695,650.00
92 Box KWH Meter Uk. L 35 cm x T 50 cm x LS 25 cm Buah 781,700.00
94 Fitting Duduk Buah 13,300.00
95 Fitting Atom Buah 3,500.00
96 Fitting Gantung E 27 Buah 11,000.00
97 Fitting Duduk E 27 Buah 41,000.00
98 Full Breket Buah 17,500.00
100 Icnitor SN 58 Buah 51,500.00
101 Inector Buah 73,500.00
102 Ignator Buah 35,000.00
103 Kap Hijau E 27 Buah 12,000.00
104 Kap Hijau E 40 Buah 16,000.00
105 Kop Skring Buah 7,000.00
106 k. Skum 10-8 Buah 1,000.00
107 MCB 1.A Buah 35,000.00
108 MCB 2.A Buah 31,600.00
109 MCB 25 A Buah 33,000.00
HARGA SATUAN DASAR
(TIDAK TERMASUK
NO MATERIAL SATUAN
PROFIT & OVERHEAD)
(Rp)
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00 21,000.00
Tukang Kayu L.02 OH 0.400 125,000.00 50,000.00
Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
Mandor L.04 OH 0.020 155,000.00 3,100.00
JUMLAH TENAGA KERJA 77,000.00
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.250 12,000.00 15,000.00
Semen Portland Kg 2.500 -
Seng gelombang Lbr 1.200 55,000.00 66,000.00
Pasir Beton m3 0.005 -
Koral Beton m3 0.009 -
Kayu 5/7 m3 0.072 4,755,000.00 342,360.00
Paku Biasa 2"-5" Kg 0.060 23,000.00 1,380.00
Mini besi Liter 0.450 52,000.00 23,400.00
JUMLAH HARGA BAHAN 448,140.00
C PERALATAN
A.2.2.1.3 (K3) Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00 21,000.00
Tukang Kayu L.02 OH 0.300 125,000.00 37,500.00
Kepala Tukang L.03 OH 0.020 145,000.00 2,900.00
Mandor L.04 OH 0.020 155,000.00 3,100.00
JUMLAH TENAGA KERJA 64,500.00
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.000 12,000.00 12,000.00
Semen Portland Kg 2.000 1,500.00 3,000.00
Kawat duri m 25.000 4,000.00 100,000.00
Pasir Beton m3 0.005 1,500.00 7.50
Koral Beton m3 0.009 125,000.00 1,125.00
Paku Biasa 2"-5" Kg 0.060 23,000.00 1,380.00
JUMLAH HARGA BAHAN 117,512.50
C PERALATAN
A.4.6.1.1 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 7.000 105,000.00 735,000.00
Tukang Kayu L.03 OH 21.000 125,000.00 2,625,000.00
Kepala Tukang L.03 OH 2.100 145,000.00 304,500.00
Mandor L.04 OH 0.350 155,000.00 54,250.00
JUMLAH TENAGA KERJA 3,718,750.00
B BAHAN
Kusen Kayu Kelas 1 (bengkirai) m3 1.100 16,000,000.00 17,600,000.00
Paku 10cm kg 1.250 23,000.00 28,750.00
Lem kayu kg 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 17,648,750.00
C PERALATAN
A.4.6.1.1.a Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu belian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 7.000 105,000.00 735,000.00
Tukang Kayu L.03 OH 21.000 125,000.00 2,625,000.00
Kepala Tukang L.03 OH 2.100 145,000.00 304,500.00
Mandor L.04 OH 0.350 155,000.00 54,250.00
JUMLAH TENAGA KERJA 3,718,750.00
B BAHAN
Kusen Kayu Belian m3 1.100 24,000,000.00 26,400,000.00
Paku 10cm kg 1.250 23,000.00 28,750.00
Lem kayu kg 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 26,448,750.00
C PERALATAN
A.4.6.1.2 Pembuatan dan pemasangan 1m3 kusen pintu dan kusen jendela, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 6.000 105,000.00 630,000.00
Tukang Kayu L.03 OH 18.000 125,000.00 2,250,000.00
Kepala Tukang L.03 OH 1.800 145,000.00 261,000.00
Mandor L.04 OH 0.300 155,000.00 46,500.00
JUMLAH TENAGA KERJA 3,187,500.00
B BAHAN
Kusen Kayu Kelas II m3 1.200 13,000,000.00 15,600,000.00
Paku 10cm kg 1.250 23,000.00 28,750.00
Lem kayu kg 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 15,648,750.00
C PERALATAN
A.4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00 375,000.00
Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
Papan kayu kelas 1 (bengkirai) m3 0.040 11,188,300.00 447,532.00
Lem kayu kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 457,532.00
C PERALATAN
A.4.6.1.5.a Pembuatan dan pemasangan 1m2 daun pintu panel, kayu belian
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00 375,000.00
Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
Papan Kayu Belian m3 0.040 14,814,000.00 592,560.00
Lem kayu kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 602,560.00
C PERALATAN
A.4.6.1.5.b Pembuatan dan pemasangan 1m2 daun pintu panel, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00 375,000.00
Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
Papan Kayu Kelas II (mabang) m3 0.040 8,300,000.00 332,000.00
Lem kayu kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 342,000.00
C PERALATAN
A.4.6.1.6.a Pembuatan dan pemasangan 1m2 pintu dan jendela kaca, kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00 84,000.00
Tukang Kayu L.03 OH 2.400 125,000.00 300,000.00
Kepala Tukang L.03 OH 0.240 145,000.00 34,800.00
Mandor L.04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 425,000.00
B BAHAN
Papan kayu kelas II (mabang) m3 0.024 8,300,000.00 199,200.00
Lem kayu kg 0.300 20,000.00 6,000.00
JUMLAH HARGA BAHAN 205,200.00
C PERALATAN
A.4.6.1.7 Pembuatan dan pemasangan 1m2 pintu dan jendela jalusi kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 1.000 105,000.00 105,000.00
Tukang Kayu L.03 OH 3.000 125,000.00 375,000.00
Kepala Tukang L.03 OH 0.300 145,000.00 43,500.00
Mandor L.04 OH 0.050 155,000.00 7,750.00
JUMLAH TENAGA KERJA 531,250.00
B BAHAN
Papan kayu kelas I m3 0.064 11,188,300.00 716,051.20
Lem kayu kg 0.500 20,000.00 10,000.00
JUMLAH HARGA BAHAN 726,051.20
C PERALATAN
A.4.6.1.8 Pembuatan dan pemasangan 1m2 pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90cm)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.700 105,000.00 73,500.00
Tukang Kayu L.03 OH 2.100 125,000.00 262,500.00
Kepala Tukang L.03 OH 0.210 145,000.00 30,450.00
Mandor L.04 OH 0.035 155,000.00 5,425.00
JUMLAH TENAGA KERJA 371,875.00
B BAHAN
Papan kayu Kelas II m3 0.025 8,300,000.00 207,500.00
Paku 1cm-2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.500 20,000.00 10,000.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 338,190.00
C PERALATAN
A.4.6.1.9 Pembuatan 1m2 pintu plywood rangkap, rangka expose kayu kelas I
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.800 105,000.00 84,000.00
Tukang Kayu L.03 OH 2.100 125,000.00 262,500.00
Kepala Tukang L.03 OH 0.240 145,000.00 34,800.00
Mandor L.04 OH 0.040 155,000.00 6,200.00
JUMLAH TENAGA KERJA 387,500.00
B BAHAN
Papan kayu kelas I m3 0.0256 11,188,300.00 286,420.48
Paku 1cm-2,5 cm kg 0.030 23,000.00 690.00
Lem kayu kg 0.500 20,000.00 10,000.00
Plywood tebal 4 mm ukuran (90x220) cm Lembar 1.000 120,000.00 120,000.00
JUMLAH HARGA BAHAN 417,110.48
C PERALATAN
A.4.6.1.13.a Pemasangan 1m3 konstruksi kuda-kuda konvensional, kayu kelas II bentang 6 meter
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 4.000 105,000.00 420,000.00
Tukang Kayu L.03 OH 12.000 125,000.00 1,500,000.00
Kepala Tukang L.03 OH 1.200 145,000.00 174,000.00
Mandor L.04 OH 0.200 155,000.00 31,000.00
JUMLAH TENAGA KERJA 2,125,000.00
B BAHAN
Balok kayu kelas II uk. 6/12 m3 1.100 11,000.00 12,100.00
Paku 12 cm kg 5.600 23,000.00 128,800.00
JUMLAH HARGA BAHAN 140,900.00
C PERALATAN
A.4.6.1.25 Pemasangan 1m2 dinding pemisah plywood rangkap, rangka kayu kelas II
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp.) (Rp.)
A TENAGA
Pekerja L.01 OH 0.200 105,000.00 21,000.00
Tukang Kayu L.03 OH 0.600 125,000.00 75,000.00
Kepala Tukang L.03 OH 0.060 145,000.00 8,700.00
Mandor L.04 OH 0.010 155,000.00 1,550.00
JUMLAH TENAGA KERJA 106,250.00
B BAHAN
balok kayukelas II uk. 6/12 m3 0.028 4,224,000.00 118,272.00
Paku 5 dan 10 Kg 0.150 23,000.00 3,450.00
Plywood 4 mm,120 x 240 Lembar 0.860 120,000.00 103,200.00
Lem kayu Kg 0.560 20,000.00 11,200.00
JUMLAH HARGA BAHAN 236,122.00