Anda di halaman 1dari 62

SKETSA GAMBAR, PERHITUNGAN VOLUME DAN ANALISA SATUAN PEKERJAAN

Desa : Dimensi
Kecamatan :
Kabupaten :
Jenis Pekerjaan :
Lokasi

Denah Tampak Depan


0.00

6.53
9.13

2.60

0.00
0.00 7.00 7.00 0.00
7.70

Tampak Belakang
Tampak Samping

3.10

6.53

10.66 1.82 12.48


3.53 3.53
1.35

3.16
15/20 Ring Balok 2.23 0.25
3.10
20/25 Kolom Selasar 2.65

6.53 2.00 0.3

0.40

1.20

0.80
1.20

0.80

1.50 9
14.4
23.4
0.9 0.9
1.80
SA SATUAN PEKERJAAN
Perhitungan Volum
: Panjang = 9.00 M
Lebar = 7.00 M Uraian Pekerjaan Panjang
Tinggi = 3.30 M PEKERJAAN PERSIAPAN
Pekerjaan Pembersihan 7.70
: Pekerjaan Pengukuran & Bouwplank 33.66

PEKERJAAN TANAH
Pekerjaan Galian Tanah 41.36
Pekerjaan Pondasi 41.36
Pekerjaan Arugan Tanah 7.70

PEKERJAAN STRUKTUR & PASANGAN


Pek. Sloof 41.36
Pek. Kolom 20/20 3.10
Pek. Ring Balok Beton 15/20 35.52
Pek. Bekisting Sloof 41.36
Pek. Bekisting Kolom 3.10
Pek. Bekisting Balok 35.52
Pek. Pembesian
2.5 Sloof 165.44
827.2
3.53 0.70
Kolom 99.20
496
0.80
2.65
Ring Balok 142.08
6.53 2.60 177.6
0.70
Pek. Pasangan Hebel 28.46
Pek. Lantai Kerja (t=0,05) 7.70
3.10
Pek. Rabat (t=0,08) 0.00
Pek. Keramik 40/40 Putih Polos 7.70
0.20 0.15 0.2 Pek. Plesteran 7.70
7.70
0.40 6.53
6.53

Pek. Acian

PEKERJAAN ATAP
Pek. Kuda-Kuda Baja Ringan + Reng Atap 7.70
0.40 7.70
Pek. Penutup Atap Genteng 6.69
Pek. Bubungan/Nok
Pek. Rangka Plafond 7.70
2.50
2.10
2.50 7.70
7.70
2.10
6.69
4.53

Pek. Plafond GRC


Pek. List Plank GRC
Pek. List Plafond

PEKERJAAN PENGECATAN
Pek. Cat Dinding Dalam & Luar
Pek. Cat Kayu Pintu & jendela 77.6
Pek. Cat Plafond
Pek. Cat Listplank 37.84

PEKERJAAN PINTU & JENDELA


Pek. Daun Pintu 0.90
Pek. Daun Jendela Kaca 1.50
Pek. Pegangan & Kunci Pintu
Pek. Engsel Pintu
Pek. Engsel Jendela
Pek. Kunci Slot
Pek. Kait Angin

PEKERJAAN LISTRIK
Pek. Pasang Titik Lampu
Pek. Stop Kontak
Pek. Saklar Ganda
Pek. Lampu TL
Pek. Pasang Lampu SL
Pek. Pasang MCB
Perhitungan Volume Pekerjaan

Lebar Tinggi Luas/Volume Satuan

9.13 70.30 M2
33.66 M

0.30 0.40 4.96 M3


0.28 0.40 4.55 M3
9.13 0.30 21.09 M3

0.15 0.20 8.69 M3


0.20 0.2 0.99 M3
0.15 0.20 7.46 M3
0.20 16.544 M2
0.40 9.92 M2
0.40 14.21 M2
334.44 Kg
6 0.22 36.72

6 0.22 128.51
6 0.22 22.02

6 0.22 88.07
6 0.22 31.53

6 0.22 27.59
3.10 97.04 M2 8.82
9.13 0.05 3.52 M3
1.00 0.08 0.00 M3
9.13 70.30 M2
3.10 9.94
3.10 33.34
3.10 80.97
1.35 17.63
141.88 M2
141.88 M2

6.69 51.51 M2
4.53 34.881 M2
7.70 86.394 M2
7.70 M
6.53 50.28
3.16 24.332
1.00 7.70
1.00 13.38
1.00 9.06
104.75 M2
104.75 M2
37.84 M
115.96 M

141.88 M2
0.3 23.28 M2
104.75 M2
0.30 11.35 M2

2.10 3.78 M2
1.20 18.00 Bh
2.00 Bh
8.00 Bh
32.00 Bh
16.00 Bh
16.00 Bh

6.00 Bh
2.00 Bh
2.00 Bh
0.00 Bh
6.00 Bh
1.00 Bh
ANALISA PERHITUNGAN SATUAN HARGA

Nama Pekerjaan :
Ukuran Pekerjaan :
Lokasi Pekerjaan :
Sumber Dana :

Pembersihan 1 M2 Lapangan & Perataan


TENAGA Koef Kebutuhan Sat H. Satuan
Pekerja 0.1000 7.0301 OH 100,000.00
Mandor 0.0500 3.5151 OH 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN

JUMLAH HARGA BAHAN


PERALATAN
Alat Bantu 0.0750 5.2726 Lot 1,750.00
JUMLAH HARGA ALAT
Jumlah

1 M3 Galian Tanah
TENAGA Koef Kebutuhan Sat H. Satuan
Pekerja 0.7500 3.7224 OH 100,000.00
Mandor 0.0250 0.1241 OH 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN

JUMLAH HARGA BAHAN


PERALATAN
Alat Bantu 0.3875 27.2416 Lot 7,875.00
JUMLAH HARGA ALAT
Jumlah

Membuat 1 M3 Pondasi
TENAGA
Pekerja 6.8244 Oh 100,000.00
Tukang 3.4122 Oh 115,000.00
Mandor 0.3412 Oh 150,000.00
Upah Angkut 0.0775 0.3526 Oh 358,577.50
JUMLAH UPAH TENAGA KERJA
BAHAN
Batu Belah 1.2000 5.4595 M3 307,500.00
Semen Portland 3.2600 14.8317 Zak 63,250.00
Pasir Pasang 0.5200 2.3658 M3 273,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.7750 3.5259 Set 19,293.10
JUMLAH HARGA ALAT
Jumlah

Pengarugan 1 M3 Tanah
TENAGA
Pekerja 0.5000 10.5452 Oh 100,000.00
Mandor 0.0500 1.0545 Oh 150,000.00
Upah Angkut 0.0275 0.5800 Ls 60,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Tanah Setempat 1.0000 21.0903 M3 120,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.2750 5.7998 Set 3,550.00
JUMLAH HARGA ALAT
Jumlah

Membuat 1 M3 Beton Mutu f’c = 7,4 MPa


TENAGA
Pekerja 1.2000 20.5642 Oh 100,000.00
Tukang 0.2000 3.4274 Oh 115,000.00
Mandor 0.0600 1.0282 Oh 150,000.00
Upah Angkut 0.0487 0.8340 Oh 343,334.45
JUMLAH UPAH TENAGA KERJA
BAHAN
Semen Portland 4.6000 78.8293 Zak 63,250.00
Pasir Beton 0.6379 10.9308 M3 272,500.00
Split/Kerikil (Maks 30 mm) 0.7083 12.1376 M3 313,300.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.4867 8.3399 Set 16,773.38
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 M2 Bekisting Dengan Papan


TENAGA
Pekerja 0.0600 2.4403 OH 100,000.00
Tukang 0.1350 5.4907 OH 115,000.00
Mandor 0.0250 1.0168 OH 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Kaso 5/7 Kayu Kelas II 0.0085 0.3457 M3 2,500,000.00
Papan/Kayu (Albasiah) 0.0120 0.4881 M3 1,554,400.00
Paku 0.2000 8.1344 Kg 15,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0733 2.9826 Lot 1,363.56
JUMLAH HARGA ALAT
Jumlah

Pembesian 1 Kg Besi Polos


TENAGA
Pekerja 0.0700 23.4106 Oh 100,000.00
Tukang 0.0070 2.3411 Oh 115,000.00
Mandor 0.0004 0.1338 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Besi Beton Polos 1.0500 351.1588 Kg 10,500.00
Kawat Beton 0.0150 5.0166 Kg 20,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0258 8.6285 Lot 383.80
JUMLAH HARGA ALAT
Jumlah

1 M3 Pemasangan Dinding Hebel


TENAGA
Pekerja 0.6710 65.115 Oh 100,000.00
Tukang 1.3000 126.154 Oh 115,000.00
Mandor 0.1300 12.615 Oh 150,000.00
Upah Angkut 0.0700 6.796 Oh 30,983.40
JUMLAH UPAH TENAGA KERJA
BAHAN
Bata Ringan (Hebel 10 cm) 8.4000 815.149 Bh 7,350.00
Semen Perekat 0.0630 6.114 Kg 3,600.00

JUMLAH HARGA BAHAN


PERALATAN
Alat Bantu 0.7003 67.961 Lot 5,961.34
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 M2 Plesteran (1SP : 3PP)


TENAGA
Pekerja 0.3000 42.565 Oh 100,000.00
Tukang 0.1500 21.282 Oh 115,000.00
Mandor 0.0150 2.128 Oh 150,000.00
Upah Angkut 0.0155 2.199 Oh 8,057.82
JUMLAH UPAH TENAGA KERJA
BAHAN
Semen Portland 0.1555 22.066 Zak 63,250.00
Pasir Pasang 0.0230 3.263 m3 273,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.1550 21.992 Lot 1,312.31
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 M2 Acian
TENAGA
Pekerja 0.2000 28.377 OH 100,000.00
Tukang 0.1000 14.188 OH 115,000.00
Mandor 0.0100 1.419 OH 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Semen Portland 0.0650 9.222 Zak 63,250.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.1033 14.661 Lot 742.23
JUMLAH HARGA ALAT
Jumlah

Membuat 1 M3 Lantai Kerja & Rabat


TENAGA
Pekerja 1.2000 4.2181 OH 100,000.00
Tukang 0.2000 0.7030 OH 115,000.00
Mandor 0.0600 0.2109 OH 150,000.00
Upah Angkut 0.0487 0.1711 Oh 343,334.45
JUMLAH UPAH TENAGA KERJA
BAHAN
Semen Portland 4.6000 16.1692 Zak 63,250.00
Pasir beton 0.6379 2.2421 M3 272,500.00
Split/Kerikil (Maks 30 mm) 0.7083 2.4896 M3 313,300.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.4867 1.7107 Lot 16,773.38
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 M2 Lantai Keramik Putih Polos (40 cm x 40 cm)


TENAGA
Pekerja 0.7000 49.2107 Oh 100,000.00
Tukang 0.3500 24.6054 Oh 115,000.00
Mandor 0.0350 2.4605 Oh 150,000.00
Upah Angkut 0.0362 2.5426 Oh 55,592.50
JUMLAH UPAH TENAGA KERJA
BAHAN
Keramik Putih Polos (40 cm x 40 cm) 1.0500 73.8161 M2 75,000.00
Semen Portland 0.2000 14.0602 Zak 63,250.00
Pasir Pasang 0.0450 3.1635 M3 273,000.00
Semen Warna 0.5000 35.1505 Kg 15,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.3617 25.4255 Lot 4,533.70
JUMLAH HARGA ALAT
Jumlah

1 M2 Pasangan Kuda-Kuda Baja Ringan + Reng Atap Genteng Metal


TENAGA
Pekerja 0.2000 17.279 Oh 100,000.00
Tukang 0.4500 38.877 Oh 115,000.00
Mandor 0.0500 4.320 Oh 150,000.00
Upah Angkut 0.0233 2.0159 Lot 65,402.62
JUMLAH UPAH TENAGA KERJA
BAHAN
Baja Main Truss C-75, 0,8 1.4880 128.554 M 14,167.00
Baja Main Truss C-75, 0,6 2.2320 192.831 M 12,667.00
Roof Bottom/Reng 5.4000 466.528 M 8,500.00
Self Driling Screw Dia-6 x 20 mm (Truss Screw) 25.0000 2,159.850 Bh 400.00
Self Driling Screw Dia-4 x 16 mm (Truss Screw) 35.0000 3,023.790 Bh 400.00
Dynabolt Dia-12 x 120 mm 1.6000 138.230 Bh 3,500.00
Talang Jurai 0.1240 10.713 M 48,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.2333 20.159 Ls 4,201.10
JUMLAH HARGA ALAT
Jumlah

1 M2 Pasangan Penutup Atap Genteng Metal


TENAGA
Pekerja 0.2000 17.279 Oh 100,000.00
Tukang 0.1000 8.639 Oh 115,000.00
Mandor 0.0010 0.086 Oh 150,000.00
Upah Angkut 0.0100 0.867 Lot 61,400.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Genteng Metal 2.0000 172.788 M2 59,500.00
Paku Biasa ½”-1” 0.2000 17.279 Kg 19,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.1003 8.668 Ls 3,089.00
JUMLAH HARGA ALAT
Jumlah

1 M Pasangan Nok Genteng Metal


TENAGA
Pekerja 0.2500 1.925 Oh 100,000.00
Tukang 0.1500 1.155 Oh 115,000.00
Mandor 0.0130 0.100 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Nok Genteng Metal 1.2000 9.240 Bh 45,000.00
Paku Biasa ½”-1” 0.0500 0.385 Kg 19,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.1377 1.060 Ls 1,983.00
JUMLAH HARGA ALAT
Jumlah

Rangka Atap Plafond


TENAGA
Pekerja 0.1500 15.7130 OH 100,000.00
Tukang 0.3000 31.4259 OH 115,000.00
Mandor 0.0180 1.8856 OH 150,000.00
Upah Angkut 0.0156 1.6341 Lot 11,439.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Rangka Metal Hollow 40.40.2 mm 4.0000 419.0120 M1 5,700.00
Paku Skrup 0.0050 0.5238 Kg 15,600.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.1560 16.3415 Ls 1,505.13
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 M2 Plafond GRC (120 x 240)


TENAGA
Pekerja 0.1000 10.4753 OH 100,000.00
Tukang 0.1000 10.4753 OH 115,000.00
Mandor 0.0050 0.5238 OH 150,000.00
Upah Angkut 0.0068 0.7158 Lot 10,050.00
JUMLAH UPAH TENAGA KERJA
BAHAN
GRC Plat 4 mm 0.3750 39.2824 Lbr 52,000.00
Paku GRC 0.0300 3.1426 Kg 20,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0683 7.1581 Ls 847.00
JUMLAH HARGA ALAT
Jumlah (A+B+C)

Pemasangan 1 M' Listplank GRC 30 cm


TENAGA
Pekerja 0.0350 1.3244 Oh 100,000.00
Tukang 0.1000 3.7840 Oh 115,000.00
Mandor 0.0020 0.0757 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Listplank GRC 30 Cm 0.4000 15.1360 Lbr 35,000.00
Paku GRC 0.0500 1.8920 Kg 20,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0457 1.7280 Ls 606.00
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 M’ List Plafond Kayu Profil


TENAGA
Pekerja 0.0500 5.7980 Oh 100,000.00
Tukang 0.0500 5.7980 Oh 115,000.00
Mandor 0.0025 0.2899 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
List Kayu Profil 1.0500 121.7580 M 6,500.00
Paku 0.0100 1.1596 Kg 15,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0342 3.9620 Ls 362.00
JUMLAH HARGA ALAT
Jumlah
Pembuatan dan Pemasangan 1 M2 Daun Pintu Panel (Kayu Kelas II atau Kelas III)
TENAGA
Pekerja 1.0000 3.7800 OH 100,000.00
Tukang 2.0000 7.5600 OH 115,000.00
Mandor 0.0500 0.1890 OH 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Papan Kayu Kuat Kelas II atau III (Maranti) 0.0400 0.1512 M3 2,500,000.00
Lem Kayu 0.5000 1.8900 Kg 27,500.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 1.0167 3.8430 Ls 9,025.00
JUMLAH HARGA ALAT
Jumlah

Pembuatan & Pemasangan 1 M2 Jendela Kaca (Kayu Kuat Kelas II atau III)
TENAGA
Pekerja 0.8000 14.4000 OH 100,000.00
Tukang 1.4000 25.2000 OH 115,000.00
Mandor 0.0400 0.7200 OH 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Papan kayu kuat kelas II atau III (Maranti) 0.0240 0.4320 M3 2,500,000.00
Kaca Polos 3 mm 1.1000 19.8000 M2 65,000.00
Lem Kayu 0.3000 5.4000 Kg 27,500.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu - - Ls -
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Buah Pegangan dan Kunci Pintu


TENAGA
Pekerja 0.0100 0.0200 OH 100,000.00
Tukang 0.5000 1.0000 OH 115,000.00
Mandor 0.0050 0.0100 OH 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Pegangan Pintu 1.0000 2.0000 Buah 55,000.00
Kunci Tanam Biasa 1.0000 2.0000 Buah 56,700.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.1700 0.3400 Ls 3,419.00
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Buah Engsel Pintu


TENAGA
Pekerja 0.0150 0.1200 Oh 100,000.00
Tukang 0.1500 1.2000 Oh 115,000.00
Mandor 0.0008 0.0064 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Engsel Pintu 1.0000 8.0000 Bh 20,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0553 0.4421 Ls 777.40
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Buah Engsel Jendela


TENAGA
Pekerja 0.0100 0.3200 Oh 100,000.00
Tukang 0.1000 3.2000 Oh 115,000.00
Mandor 0.0005 0.0160 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Engsel Jendela (Kupu-Kupu) 1.0000 32.0000 Bh 20,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0368 1.1787 Ls 651.50
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Buah Kunci Slot


TENAGA
Pekerja 0.0200 0.3200 Oh 100,000.00
Tukang 0.2000 3.2000 Oh 115,000.00
Mandor 0.0010 0.0160 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Kunci Slot 1.0000 16.0000 Bh 15,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0737 1.1787 Ls 803.00
JUMLAH HARGA ALAT
Jumlah
Pemasangan 1 Buah Kait Angin
TENAGA
Pekerja 0.0150 0.2400 Oh 100,000.00
Tukang 0.1500 2.4000 Oh 115,000.00
Mandor 0.0080 0.1280 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Kait Angin 1.0000 16.0000 Buah 26,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0577 0.9227 Ls 919.00
JUMLAH HARGA ALAT
Jumlah

Pengecatan 1 M2 Dinding
TENAGA
Pekerja 0.0200 2.8377 Oh 100,000.00
Tukang 0.0630 8.9386 Oh 115,000.00
Mandor 0.0030 0.4256 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Plamuur 0.1000 14.1883 Kg 10,000.00
Cat Dasar Dinding Setara Vinilex 0.1000 14.1883 Kg 60,000.00
Cat Penutup Dinding Setara Vinilex 0.2600 36.8896 Kg 60,000.00
Ampelas 0.5000 70.9415 Lbr 5,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0287 4.0673 Ls 695.90
JUMLAH HARGA ALAT
Jumlah

1 M2 Pengecatan Kayu Setara Avian


TENAGA
Pekerja 0.0700 1.6296 Oh 100,000.00
Tukang 0.0090 0.2095 Oh 115,000.00
Mandor 0.0030 0.0698 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Cat Menie 0.2000 4.6560 Kg 21,000.00
Plamuur 0.1500 3.4920 Kg 10,000.00
Cat Dasar Kayu Setara Avian 0.1700 3.9576 Kg 55,000.00
Cat Penutup Kayu Setara Avian 0.2600 6.0528 Kg 55,000.00
Kuas 0.0100 0.2328 Bh 10,000.00
Amplas 0.2000 4.6560 Lbr 5,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0273 0.6363 Ls 778.70
JUMLAH HARGA ALAT
Jumlah

Pengecatan 1 M2 Plafond & Listplank Setara VINILEX


TENAGA
Pekerja 0.0200 2.3221 Oh 100,000.00
Tukang 0.0630 7.3146 Oh 115,000.00
Mandor 0.0030 0.3483 Oh 150,000.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Plamuur 0.1000 11.6105 Kg 10,000.00
Cat Dasar Plafond & Listplank Setara Vinilex 0.1000 11.6105 Kg 25,000.00
Cat Penutup Plafond & Listplang Setara Vinilex 0.3000 34.8315 Kg 25,000.00
Ampelas 0.5000 58.0525 Lbr 5,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.0287 3.3283 Lot 463.90
JUMLAH HARGA ALAT
Jumlah
Pemasangan 1 Buah Titik Lampu
TENAGA
Upah 1.0000 6.0000 Ls 87,150.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Pipa listrik 5/8 " 3.0000 18.0000 Btg 2,500.00
Kabel NYM 3 x 1,5 mm (ETERNA) 24.0000 144.0000 M 6,500.00
T Dus 3.0000 18.0000 Bh 1,000.00
L Bow 4.0000 24.0000 Bh 1,000.00
Las Dop 3.0000 18.0000 Bh 300.00
Klem 24.0000 144.0000 Bh 100.00
Mongkok 1.0000 6.0000 Bh 500.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.3333 2.0000 Lot 5,229.00
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Buah Stop Kontak


TENAGA
Upah 1.0000 2.0000 Ls 87,150.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Pipa listrik 5/8 " 3.0000 6.0000 Btg 2,500.00
Kabel NYM 3 x 1,5 mm (ETERNA) 24.0000 48.0000 M 6,500.00
T Dus 3.0000 6.0000 Bh 1,000.00
L Bow 4.0000 8.0000 Bh 1,000.00
Las Dop 3.0000 6.0000 Bh 300.00
Klem 24.0000 48.0000 Bh 100.00
Mongkok 1.0000 2.0000 Bh 500.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.3333 0.6667 Lot 5,229.00
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Buah Saklar


TENAGA
Upah 1.0000 2.0000 Ls 96,800.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Pipa listrik 5/8 " 3.0000 6.0000 Btg 2,500.00
Kabel NYM 3 x 1,5 mm (ETERNA) 24.0000 48.0000 M 6,500.00
T Dus 3.0000 6.0000 Bh 1,000.00
L Bow 4.0000 8.0000 Bh 1,000.00
Las Dop 3.0000 6.0000 Bh 300.00
Klem 24.0000 48.0000 Bh 100.00
Mongkok 1.0000 2.0000 Bh 500.00
Saklar Ganda Broco 1.0000 2.0000 Bh 19,300.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.3333 0.6667 Lot 5,808.00
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Lampu TL
TENAGA
Upah 1.0000 - Ls 78,850.00
JUMLAH UPAH TENAGA KERJA
BAHAN
1 bh lampu TL 1 x 18 Watt (setara PHILIPS) + 1.0000 - Bh 157,700.00
Armatur Tanam (Inbow) + Reflektor
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.3333 - Lot 4,731.00
JUMLAH HARGA ALAT
Jumlah
Pemasangan 1 Lampu SL
TENAGA
Upah 1.0000 6.0000 Ls 23,400.00
JUMLAH UPAH TENAGA KERJA
BAHAN
1 bh lampu SL 14 Watt setara PHILIPS 1.0000 6.0000 Bh 34,800.00
1 bh Fitting Lampu 1.0000 6.0000 Bh 12,000.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.3333 2.0000 Lot 1,404.00
JUMLAH HARGA ALAT
Jumlah

Pemasangan 1 Buah MCB + Kotak MCB


TENAGA
Upah 1.0000 1.0000 Ls 139,200.00
JUMLAH UPAH TENAGA KERJA
BAHAN
Pipa listrik 5/8 " 3.0000 3.0000 Btg 2,500.00
Kabel NYM 3 x 2,5 mm (ETERNA) 15.0000 15.0000 M 11,020.00
T Dus 1.0000 1.0000 Bh 1,000.00
L Bow 2.0000 2.0000 Bh 1,000.00
Klem biasa 24.0000 24.0000 Bh 100.00
MCB 1.0000 1.0000 Bh 47,000.00
Box MCB (4 Grup) 1.0000 1.0000 Bh 53,200.00
JUMLAH HARGA BAHAN
PERALATAN
Alat Bantu 0.3333 0.3333 Lot 8,352.00
JUMLAH HARGA ALAT
Jumlah
70.30
Jumlah
10,000.00 703,010.00
7,500.00 527,257.50
17,500.00

-
-

131.25 9,227.01 1,239,494.51


131.25
17,631.25

4.96
Jumlah
75,000.00
3,750.00
78,750.00

-
-

3,051.56
3,051.56
81,801.56

4.55

150,000.00
86,250.00
11,250.00
27,789.76
275,289.76

369,000.00
206,195.00
141,960.00
717,155.00

14,952.15
14,952.15
1,007,396.91

-
21.09 -
-
50,000.00 1,054,515.00
7,500.00 158,177.25
1,650.00 34,799.00
59,150.00 -
-
120,000.00 2,530,836.00
120,000.00 -
-
976.25 20,589.41
976.25 -
180,126.25 - 3,798,916.65
-
17.14 -
-
120,000.00 2,056,416.00
23,000.00 394,146.40
9,000.00 154,231.20
16,708.94 286,337.82
168,708.94 -
-
290,950.00 4,985,951.96
173,816.07 2,978,651.25
221,902.83 3,802,704.38
686,668.90 -
-
8,163.04 139,888.45
8,163.04 -
863,540.89 - 14,798,327.46
-
40.67 -
-
6,000.00 244,032.00
15,525.00 631,432.80
3,750.00 152,520.00
25,275.00 -
-
21,250.00 864,280.00
18,652.80 758,646.68
3,000.00 122,016.00
42,902.80 -
-
99.99 4,066.96
99.99 -
68,277.79 - 2,776,994.44
-
334.44 -
-
7,000.00 2,341,058.63
805.00 269,221.74
60.00 20,066.22
7,865.00 -
-
11,025.00 3,687,167.34
300.00 100,331.08
11,325.00 -
-
9.90 3,311.61
9.90 -
19,199.90 - 6,421,156.62
-
97.04 -
-
67,100.00 6,511,484.65
149,500.00 14,507,704.25
19,500.00 1,892,309.25
2,169.87 210,567.52
238,269.87 -
-
61,740.00 5,991,342.21
226.80 22,009.01
-
61,966.80 -
-
4,174.92 405,140.72
4,174.92 -
304,411.59 - 29,540,557.61
-
141.88 -
-
30,000.00 4,256,490.00
17,250.00 2,447,481.75
2,250.00 319,236.75
124.90 17,720.65
49,624.90 -
-
9,836.64 1,395,651.99
6,279.00 890,883.36
16,115.64 -
-
203.41 28,860.21
203.41 -
65,943.94 - 9,356,324.71
-
141.88 -
-
20,000.00 2,837,660.00
11,500.00 1,631,654.50
1,500.00 212,824.50
33,000.00 -
-
4,111.25 583,316.48
4,111.25 -
-
76.70 10,881.94
76.70 -
37,187.95 - 5,276,337.43

-
3.52 -
-
120,000.00 421,806.00
23,000.00 80,846.15
9,000.00 31,635.45
16,708.94 58,732.77
168,708.94 -
-
290,950.00 1,022,703.80
173,816.07 610,972.18
221,902.83 779,999.53 2,413,675.51
686,668.90 -
-
8,163.04 28,693.51
8,163.04 -
863,540.89 - 3,035,389.39
-
70.30 -
-
70,000.00 4,921,070.00
40,250.00 2,829,615.25
5,250.00 369,080.25
2,010.60 141,346.87
117,510.60 -
-
78,750.00 5,536,203.75
12,650.00 889,307.65
12,285.00 863,647.79
7,500.00 527,257.50
111,185.00 -
-
1,639.69 115,271.72
1,639.69 -
230,335.28 - 16,192,800.77
-
86.39 -
-
20,000.00 1,727,880.00
51,750.00 4,470,889.50
7,500.00 647,955.00
1,526.06 131,842.53
80,776.06 -
-
21,080.50 1,821,228.37
28,272.74 2,442,595.45
45,900.00 3,965,484.60
10,000.00 863,940.00
14,000.00 1,209,516.00
5,600.00 483,806.40
5,952.00 514,217.09
130,805.24 -
-
980.26 84,688.39
980.26 -
212,561.56 - 18,364,043.32
-

86.39 -
-
20,000.00 1,727,880.00
11,500.00 993,531.00
150.00 12,959.10
616.05 53,222.74
32,266.05 -
-
119,000.00 10,280,886.00
3,800.00 328,297.20
122,800.00 -
-
309.93 26,776.06
309.93 -
155,375.98 - 13,423,552.10
-
7.70 -
-
25,000.00 192,500.00
17,250.00 132,825.00
1,950.00 15,015.00
44,200.00 -
-
54,000.00 415,800.00
950.00 7,315.00 423,115.00
54,950.00 -
-
272.99 2,102.05
272.99 -
99,422.99 - 765,557.05
-
104.75 -
-
15,000.00 1,571,295.00
34,500.00 3,613,978.50
2,700.00 282,833.10
178.45 18,693.01
52,378.45 -
-
22,800.00 2,388,368.40
78.00 8,170.73
22,878.00 -
-
234.80 24,596.02
234.80 -
75,491.25 - 7,907,934.76
-
104.75 -
-
10,000.00 1,047,530.00
11,500.00 1,204,659.50
750.00 78,564.75
68.68 7,193.91
22,318.68 -
-
19,500.00 2,042,683.50
600.00 62,851.80
20,100.00 -
-
57.88 6,062.93
57.88 -
42,476.55 - 4,449,546.39
-

37.84 -
-
3,500.00 132,440.00
11,500.00 435,160.00
300.00 11,352.00
15,300.00 -
-
14,000.00 529,760.00
1,000.00 37,840.00 567,600.00
15,000.00 -
-
27.67 1,047.18
27.67 -
30,327.67 - 1,147,599.18
-
115.96 -
-
5,000.00 579,800.00
5,750.00 666,770.00
375.00 43,485.00
11,125.00 -
-
6,825.00 791,427.00
150.00 17,394.00
6,975.00 -
-
12.37 1,434.23
12.37 -
18,112.37 - 2,100,310.23
3.78 -
-
100,000.00 378,000.00
230,000.00 869,400.00
7,500.00 28,350.00
337,500.00 -
-
100,000.00 378,000.00
13,750.00 51,975.00 429,975.00
113,750.00 -
-
9,175.42 34,683.08
9,175.42 -
460,425.42 - 1,740,408.08
-
18.00 -
-
80,000.00 1,440,000.00
161,000.00 2,898,000.00
6,000.00 108,000.00
247,000.00 -
-
60,000.00 1,080,000.00
71,500.00 1,287,000.00
8,250.00 148,500.00
139,750.00 -
-
- -
- -
386,750.00 - 6,961,500.00
-

2.00

1,000.00 2,000.00
57,500.00 115,000.00
750.00 1,500.00
59,250.00

55,000.00 110,000.00
56,700.00 113,400.00
111,700.00
581.23 1,162.46
581.23
171,531.23 343,062.46

8.00

1,500.00 12,000.00
17,250.00 138,000.00
120.00 960.00
18,870.00

20,000.00 160,000.00
20,000.00

42.96 343.71
42.96
38,912.96 311,303.71

32.00

1,000.00 32,000.00
11,500.00 368,000.00
75.00 2,400.00
12,575.00

20,000.00 640,000.00
20,000.00

24.00 767.90
24.00
32,599.00 1,043,167.90

16.00

2,000.00 32,000.00
23,000.00 368,000.00
150.00 2,400.00
25,150.00

15,000.00 240,000.00
15,000.00

59.15 946.47
59.15
40,209.15 643,346.47
16.00

1,500.00 24,000.00
17,250.00 276,000.00
1,200.00 19,200.00
19,950.00

26,000.00 416,000.00
26,000.00

53.00 847.93
53.00
46,003.00 736,047.93

141.88 -
-
2,000.00 283,766.00
7,245.00 1,027,942.34
450.00 63,847.35
9,695.00 -
-
1,000.00 141,883.00
6,000.00 851,298.00
15,600.00 2,213,374.80
2,500.00 354,707.50
25,100.00 -
-
19.95 2,830.44
19.95 -
34,814.95 - 4,939,649.43
-
23.28 -
-
7,000.00 162,960.00
1,035.00 24,094.80
450.00 10,476.00
8,485.00 -
-
4,200.00 97,776.00
1,500.00 34,920.00
9,350.00 217,668.00
14,300.00 332,904.00
100.00 2,328.00
1,000.00 23,280.00
30,450.00 -
-
21.28 495.50
21.28 -
38,956.28 - 906,902.30
-
116.11 -
-
2,000.00 232,210.00
7,245.00 841,180.73
450.00 52,247.25
9,695.00 -
-
1,000.00 116,105.00
2,500.00 290,262.50
7,500.00 870,787.50
2,500.00 290,262.50
13,500.00 -
-
13.30 1,544.02
13.30 -
23,208.30 - 2,694,599.49
6.00

87,150.00 522,900.00
87,150.00

7,500.00 45,000.00
156,000.00 936,000.00
3,000.00 18,000.00
4,000.00 24,000.00
900.00 5,400.00
2,400.00 14,400.00
500.00 3,000.00
174,300.00

1,743.00 10,458.00
1,743.00
263,193.00 1,579,158.00

2.00
87,150.00 174,300.00
87,150.00

7,500.00 15,000.00
156,000.00 312,000.00
3,000.00 6,000.00
4,000.00 8,000.00
900.00 1,800.00
2,400.00 4,800.00
500.00 1,000.00
174,300.00

1,743.00 3,486.00
1,743.00
263,193.00 526,386.00

2.00

96,800.00 193,600.00
96,800.00

7,500.00 15,000.00
156,000.00 312,000.00
3,000.00 6,000.00
4,000.00 8,000.00
900.00 1,800.00
2,400.00 4,800.00
500.00 1,000.00
19,300.00 38,600.00
193,600.00

1,936.00 3,872.00
1,936.00
292,336.00 584,672.00

78,850.00 -
78,850.00

157,700.00 -
157,700.00

1,577.00 -
1,577.00
238,127.00 -
6.00

23,400.00 140,400.00
23,400.00

34,800.00 208,800.00
12,000.00 72,000.00
46,800.00

468.00 2,808.00
468.00
70,668.00 424,008.00

1.00

139,200.00 139,200.00
139,200.00

7,500.00 7,500.00
165,300.00 165,300.00
1,000.00 1,000.00
2,000.00 2,000.00
2,400.00 2,400.00
47,000.00 47,000.00
53,200.00 53,200.00
278,400.00

2,784.00 2,784.00
2,784.00
420,384.00 420,384.00

164,449,438.39
164,593,428.04
164,593,428.04
1,239,494.51
3,798,916.65

14,798,327.46
2,776,994.44

6,421,156.62

29,540,557.61 -
9,356,324.71

5,276,337.43

3,035,389.39
16,192,800.77

18,364,043.32
13,423,552.10

765,557.05

7,907,934.76
4,449,546.39

1,147,599.18

2,100,310.23
1,740,408.08

6,961,500.00
343,062.46

311,303.71

1,043,167.90

643,346.47
736,047.93

4,939,649.43
906,902.30

2,694,599.49

1,579,158.00
526,386.00

584,672.00 -

-
424,008.00 -

420,384.00
RENCANA ANGGARAN BIAYA

Nama Pekerjaan :
Ukuran Pekerjaan :
Lokasi Pekerjaan :
Sumber Dana :

Harga Satuan
No Uraian Pekerjaan Volume Sat
(Rp)
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan & Perataan 70.30 M2 17,631.25
Pek. Pengukuran & Bouwplank 16.83 M -

Sub Jumlah

II PEKERJAAN TANAH
Pek. Galian Tanah 4.96 M3 81,801.56
Pek. Pondasi 4.55 M3 1,007,396.91
1 Pek. Arugan Tanah 21.09 M3 180,126.25

Sub Jumlah

III PEKERJAAN STRUKTUR DAN PASANGAN


1 Pek. Beton (Sloof, Kolom & Ring Balok) 8.45 M3 863,540.89
2 Pek. Bekisting 24.13 M2 68,277.79
3 Pek. Pembesian 334.44 Kg 19,199.90
4 Pek. Pasangan Hebel 97.04 M2 304,411.59
5 Pek. Plesteran 141.88 M2 65,943.94
6 Pek. Acian 141.88 M2 37,187.95
7 Pek. Pas. Lantai kerja (t=0,05) & Rabat Beton (t=0,08) 3.52 M3 863,540.89
8 Pek. Pasangan Keramik Lantai 40 x 40 Putih Polos 70.30 M2 230,335.28

Sub Jumlah

IV PEKERJAAN ATAP
1 Pek. Kuda-Kuda Baja Ringan + Reng Atap 86.39 M2 212,561.56
4 Pek. Penutup Atap Genteng 86.39 M2 155,375.98
5 Pek. Bubungan/Nok 7.70 M 99,422.99
6 Pek. Rangka Plafond 104.75 M2 75,491.25
7 Pek. Plafond GRC 104.75 M2 42,476.55
8 Pek. List Plank GRC 37.84 M 30,327.67
9 Pek. List Plafond 115.96 M 18,112.37

Sub Jumlah

V PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Dalam & Luar 141.88 M2 34,814.95
2 Pek. Cat Kayu Pintu & jendela 23.28 M2 38,956.28
3 Pek. Cat Plafond 104.75 M2 23,208.30
4 Pek. Cat Listplank 11.35 M2 23,208.30

Sub Jumlah

VI PEKERJAAN PINTU & JENDELA


1 Pek. Daun Pintu 3.78 M2 460,425.42
2 Pek. Daun Jendela 18.00 M2 386,750.00
3 Pek. Pegangan & Kunci Pintu 2.00 Bh 171,531.23
4 Pek. Engsel Pintu 8.00 Bh 38,912.96
5 Pek. Engsel Jendela 32.00 Bh 32,599.00
6 Pek. Kunci Slot 16.00 Bh 40,209.15
7 Pek. Kait Angin 16.00 Bh 46,003.00

Sub Jumlah

VII PEKERJAAN LISTRIK


1 Pek. Pasang Titik Lampu 6.00 Bh 263,193.00
2 Pek. Stop Kontak 2.00 Bh 263,193.00
3 Pek. Saklar Ganda 2.00 Bh 292,336.00
4 Pek. Lampu TL 0.00 Bh 238,127.00
5 Pek. Pasang Lampu SL 6.00 Bh 70,668.00
6 Pek. Pasang MCB 1.00 Bh 420,384.00

Sub Jumlah

VIII PERALATAN & ADMINISTRASI

JUMLAH TOTAL
RENCANA ANGGARAN BIAYA

Jumlah
(Rp)

1,239,494.51
-

1,239,494.51

405,997.52
4,583,252.98
3,798,916.65

8,788,167.14

7,297,956.74
1,647,406.62
6,421,156.62
29,540,557.61
9,356,324.71
5,276,337.43
3,035,389.39
16,192,800.77

78,767,929.88

18,364,043.32
13,423,552.10
765,557.05
7,907,934.76
4,449,546.39
1,147,599.18
2,100,310.23

48,158,543.03

4,939,649.43
906,902.30
2,431,138.89
263,460.60

8,541,151.22

1,740,408.08
6,961,500.00
343,062.46
311,303.71
1,043,167.90
643,346.47
736,047.93

11,778,836.55

1,579,158.00
526,386.00
584,672.00
-
424,008.00
420,384.00

3,534,608.00

3,784,697.70

164,593,428.04
RENCANA ANGGARAN BIAYA

Nama Pekerjaan :
Ukuran Pekerjaan :
Lokasi Pekerjaan :
Sumber Dana :

Jumlah Harga
No Uraian Pekerjaan
(Rp)
I PEKERJAAN PERSIAPAN 1,239,494.51
II PEKERJAAN TANAH 8,788,167.14

III PEKERJAAN STRUKTUR DAN PASANGAN 78,767,929.88


IV PEKERJAAN ATAP 48,158,543.03
V PEKERJAAN PENGECETAN 8,541,151.22
VI PEKERJAAN PINTU & JENDELA 11,778,836.55

VII PEKERJAAN LISTRIK 3,534,608.00


VIII PERALATAN & ADMINISTRASI 3,784,697.70

Jumlah Total 164,593,428.04

-
-
RINCIAN RENCANA ANGGARAN BIAYA

Nama Pekerjaan :
Ukuran Pekerjaan :
Lokasi Pekerjaan :
Sumber Dana :

Harga Satuan
Uraian Volume Sat
(Rp)
A. TENAGA
1. Pekerja 349.26 Oh 100,000.00

2. Tukang 358.57 Oh 115,000.00


3. Mandor 34.79 Oh 150,000.00
4. Upah Angkut

Jumlah

B. BAHAN
1. Tanah Setempat 21.09 M3 120,000.00
2. Semen Portland 140.35 Zak 63,250.00
3. Pasir Beton 13.17 M3 272,500.00
4. Split/Kerikil (Maks 30 mm) 14.63 M3 313,300.00
5. Kaso 5/7 Kayu Kelas II 0.35 M3 2,500,000.00
6. Papan/Kayu (Albasiah) 0.49 M3 1,554,400.00
7. Besi Beton Polos 351.16 Kg 10,500.00
8. Kawat Beton 5.02 Kg 20,000.00
9. Bata Ringan (Hebel 10 cm) 815.15 Bh 7,350.00
10. Semen Perekat 6.11 Kg 3,600.00
11. Pasir Pasang 6.43 M3 273,000.00
12. Keramik Putih Polos (40 cm x 40 cm) 73.82 M2 75,000.00
13. Semen Warna 35.15 Kg 15,000.00
14. Baja Main Truss C-75, 0,8 128.55 M 14,167.00
15. Baja Main Truss C-75, 0,6 192.83 M 12,667.00
16. Roof Bottom/Reng 466.53 M 8,500.00
17. Self Driling Screw Dia-6 x 20 mm (Truss Screw) 2159.85 Bh 400.00
18. Self Driling Screw Dia-4 x 16 mm (Truss Screw) 3023.79 Bh 400.00
19. Dynabolt Dia-12 x 120 mm 138.23 Bh 3,500.00
20. Talang Jurai 10.71 M 48,000.00
21. Genteng Metal 172.79 M2 59,500.00
22. Paku Biasa ½”-1” 17.66 Kg 19,000.00
23. Nok Genteng Metal 9.24 Bh 45,000.00
24. Rangka Metal Hollow 40.40.2 mm 419.01 M 5,700.00
25. Paku Skrup 0.52 Kg 15,600.00
26. GRC Plat 4 mm 39.28 Lbr 52,000.00
27. Paku GRC 5.03 Kg 20,000.00
28. Listplank GRC 30 Cm 15.14 Lbr 35,000.00
29. List Kayu Profil 121.76 M 6,500.00
30. Paku 9.29 Kg 15,000.00
31. Papan Kayu Kuat Kelas II atau III (Maranti) 0.58 M3 2,500,000.00
32. Kaca Polos 3 mm 19.80 M2 65,000.00
33. Lem Kayu 7.29 Kg 27,500.00
34. Cat Penutup Dinding Setara Vinilex 51.08 Kg 60,000.00
35. Cat Penutup Kayu Setara Avian 10.01 Kg 55,000.00
36. Cat Penutup Plafond & Listplang Setara Vinilex 46.44 Kg 25,000.00
37. Plamuur 29.29 Kg 10,000.00
38. Ampelas 133.65 Lbr 5,000.00
39. Cat Menie 4.66 Kg 21,000.00
40. Kuas 0.23 Bh 10,000.00
41. Pegangan Pintu 2.00 Bh 55,000.00
42. Kunci Tanam Biasa 2.00 Bh 56,700.00
43. Engsel Pintu 8.00 Bh 20,000.00
44. Engsel Jendela (Kupu-Kupu) 32.00 Bh 20,000.00
45. Kunci Slot 16.00 Bh 15,000.00
46. Kait Angin 16.00 Bh 26,000.00
47. Pipa listrik 5/8 " 33.00 Btg 2,500.00
48. Kabel NYM 3 x 1,5 mm (ETERNA) 240.00 M 6,500.00
49. Kabel NYM 3 x 2,5 mm (ETERNA) 15.00 M 11,020.00
50. T Dus 31.00 Bh 1,000.00
51. L Bow 42.00 Bh 1,000.00
52. Las Dop 30.00 Bh 300.00
53. Klem 264.00 Bh 100.00
54. Mongkok 10.00 Bh 500.00
55. Saklar Ganda Broco 2.00 Bh 19,300.00
1 bh lampu TL 1 x 18 Watt (setara PHILIPS) +
56. - Bh 157,700.00
Armatur Tanam (Inbow) + Reflektor
57. 1 bh lampu SL 14 Watt setara PHILIPS 6.00 Bh 34,800.00
58. 1 bh Fitting Lampu 6.00 Bh 12,000.00
59. MCB 1.00 Bh 47,000.00
60. Box MCB (4 Grup) 1.00 Bh 53,200.00

Jumlah Bahan

C. PERALATAN
1. Alat Bantu
2. (Rincian sesuai dengan kebutuhan)

Jumlah Peralatan

D. ADMINISTRASI
1. Papan Nama Kegiatan 1.00 Bh 250,000.00
2. Prasasti 1.00 Bh 500,000.00
3. Pembuatan SPJ 1.00 Bh 350,000.00
4. Penggandaan SPJ 6.00 Bh 50,000.00
5. Pembuatan RAB 1.00 Ls 750,000.00
Jumlah Administrasi

Jumlah Total (Tenaga + Bahan + Peralatan + Administrasi)


RINCIAN RENCANA ANGGARAN BIAYA

Jumlah
(Rp)

34,925,803.28

41,235,534.20
5,218,882.92
2,130,856.80

83,511,077.19

2,530,836.00
8,876,931.88
3,589,623.43
4,582,703.91
864,280.00
758,646.68
3,687,167.34
100,331.08
5,991,342.21
22,009.01
1,754,531.14
5,536,203.75
527,257.50
1,821,228.37
2,442,595.45
3,965,484.60
863,940.00
1,209,516.00
483,806.40
514,217.09
10,280,886.00
335,612.20
415,800.00
2,388,368.40
8,170.73
2,042,683.50
100,691.80
529,760.00
791,427.00
139,410.00
1,458,000.00
1,287,000.00
200,475.00
3,064,672.80
550,572.00
1,161,050.00
292,908.00
668,250.00
97,776.00
2,328.00
110,000.00
113,400.00
160,000.00
640,000.00
240,000.00
416,000.00
82,500.00
1,560,000.00
165,300.00
31,000.00
42,000.00
9,000.00
26,400.00
5,000.00
38,600.00

208,800.00
72,000.00
47,000.00
53,200.00

79,958,693.29

979,667.91
1,634,697.70

2,614,365.61

250,000.00
500,000.00
350,000.00
300,000.00
750,000.00
2,150,000.00

164,593,428.04
Pekerjaan Galian 7 0.6 1 4.2

Pekerjaan Batu Belah 2 0.35 0.85 2.38


7 0.55 2.2 16.94
19.32

Pekerjaan Cor Beton


Lantai 6.6 3 0.1 1.98
Balok 6.6 0.25 0.3 0.99
3 0.25 0.3 0.45
Balok Tumpuan 3 0.25 0.3 0.45
3 0.25 0.4 0.6
4.47
0.894
5.364

Pekerjaan Bekisting
Lantai 6.6 3 19.8
6.6 0.1 1.32
Balok 6.6 0.25 3.3
6.6 0.3 7.92
3 0.25 0.75
3 0.3 1.8
Balok Tumpuan 3 0.3 1.8
36.69

Pek. Pembesian
Lantai besi 10 6.6
44 3 132
3
20 6 120
252 10 0.62 155.36

Balok Besi 10 6.6 4 52.8 32.55


44 1.1 96.8 59.68
3 4 12 7.40
20 1.1 44 27.13
Balok Tumpuan 3
20 0.25 10 6.17
1.666666667 0.25 0.833333333 0.51
288.79
M3 Pek. Galian
Pekerja 0.075 4.2 0.3150 70,000.00
Mandor 0.025 4.2 0.1050 115,000.00

M3 Pek. Batu Belah


Pekerja 1.5000 19.32 28.9800 70,000.00
Tukang 0.7500 19.32 14.4900 105,000.00
Mandor 0.0750 19.32 1.4490 115,000.00
Batu Belah 1.2000 19.32 23.1840 275,000.00
Semen Portland 3.2600 19.32 62.9832 70,000.00
Pasir Pasang 0.5200 19.32 10.0464 250,000.00

Pek. Bekisting
Pekerja 0.1200 36.69 4.4028 70,000.00
M3 Tukang 0.2700 36.69 9.9063 105,000.00
Mandor 0.1500 36.69 5.5035 115,000.00
Kayu Kaso 0.0170 36.69 0.6237 3,175,000.00
Multiplek 0.3470 36.69 12.7314 150,000.00
Paku 0.4000 36.69 14.6760 20,000.00

Pek. Beton
Pekerja 1.6500 5.364 8.8506 70,000.00
Tukang 0.2750 5.364 1.4751 105,000.00
Mandor 0.0830 5.364 0.4452 115,000.00
M2 Semen Portland 8.2600 5.364 44.3066 70,000.00
Pasir beton 0.4864 5.364 2.6092 275,000.00
Kerikil (Maks 30 m 0.7041 5.364 3.7770 375,000.00

Pek. Pembesian
Pekerja 0.0700 288.79 20.2152 70,000.00
Tukang 0.0070 288.79 2.0215 105,000.00
Mandor 0.0004 288.79 0.1155 115,000.00
Besi Beton Polos 1.0500 288.79 303.2286 25,000.00
Kawat Beton 0.0150 288.79 4.3318 25,000.00

Kg Realisasi

Rencana

Selisih
22,050.00 Pekerja 62.7636 70,000.00
12,075.00 Tukang 27.8929 105,000.00
Mandor 7.6182 115,000.00

2,028,600.00
1,521,450.00 Bahan
166,635.00 Batu Belah 23.1840 275,000.00
6,375,600.00 Semen Portlan 107.2898 70,000.00
4,408,824.00 Pasir Pasang 10.0464 250,000.00
2,511,600.00 Pasir beton 2.6092 275,000.00
Kerikil (Maks 3.7770 375,000.00
Kayu Kaso 0.6237 3,175,000.00
308,196.00 Multiplek 12.7314 150,000.00
1,040,161.50 Paku 14.6760 20,000.00
632,902.50 Besi Beton Pol 303.2286 25,000.00
1,980,342.75 Kawat Beton 4.3318 25,000.00
1,909,714.50
293,520.00

619,542.00
154,885.50 Alat 4,452,360.00
51,199.38
3,101,464.80
717,530.79
1,416,373.45 Realisasi
20%

1,415,066.84
212,260.03
13,284.30 Rencana
7,580,715.19
108,295.93 Selisih

3,290,000.00
4,452,360.00

46,344,649.44
20% 9,268,929.89
55,613,579.33

63,271,360.00

- 7,657,780.67
4,393,454.84
2,928,757.03
876,096.18
8,198,308.04

6,375,600.00
7,510,288.80
2,511,600.00
717,530.79
1,416,373.45
1,980,342.75
1,909,714.50
293,520.00
7,580,715.19
108,295.93
3,290,000.00

33,693,981.40

4,452,360.00

4,452,360.00

46,344,649.44
9,268,929.89

55,613,579.33

63,271,360.00

(7,657,780.67)

Anda mungkin juga menyukai