i TERMIN I (Progress 0 % )
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.54 0.54
A PEKERJAAN PERSIAPAN 0.22
0.10 2.50 0.71
B PEKERJAAN TANAH DAN PASIR 3.29
0.60 3.30 4.84
C PEKERJAAN PONDASI 8.14
D PEKERJAAN STRUKTUR
1.30 4.83 4.83 10.40
STRUKTUR BETON 23.01
0.50 5.70 9.92 0.01
PEKERJAAN ATAP 22.13
0.47 0.47 0.47
E PEKERJAAN PLAFOND 2.09
4.78 4.78 4.78 4.78
F PEKERJAAN PASANGAN 15.94
1.94 1.94 1.94 1.94 1.94
G PEKERJAAN KUSEN PINTU & JENDELA 10.37
0.65 0.65 0.65 0.65
H PEKERJAAN PENGECATAN 2.60
0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.33
I PEKERJAAN PLUMBING & SANITAIR 2.48 16.52
10.95 1.28 1.28 1.28 1.28 1.28 1.28 1.28 1.28
J PEKERJAAN LISTRIK 9.72
0.00 0.00 6.30
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.86 1.86
1.11 2.83
ii TERMIN II (Progress 50% )
100.00
Bobot Rencana 0.00 0.70 7.10 9.66 5.33 16.10 11.09 5.26 5.25 8.32 8.32 3.55 3.55 4.20 2.26 4.65 4.65
Akumulasi Rencana 0.00 0.70 7.81 17.47 22.80 38.90 49.99 55.25 60.49 68.82 77.14 80.69 84.24 88.43 90.69 95.34 100.00
Bobot Realisasi 0.00 1.72 3.47 4.65 5.57
Akumulasi Realisasi 1.11 2.83 6.30 10.95 16.52