Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Bulan ke - 6 ( Enam )
Periode
30-Dec-1899 s/d 14-Nov-2016
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21 55
0.10
51.
47.173
42.672 48.687
F
0.890 0.890 0.890
3.585 3.585 3.585 45.724
3.585 3.585 3.585
I 34.806
39.582
T 27.910
T 27.910
R 20.401
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964 23.886
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687 55.447
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
3.414 2.883 2.446 11.292 3.302 2.343 5.403 18.615 0.000 0.000 0.000 ###
58.861 61.743 64.189 66.739 70.041 72.384 77.787 85.354 0.000 0.000 0.000 ###
-0.584 -2.882 -6.652 -7.147 -8.438 -10.688 -10.013 -5.361 -94.929 -97.300 -98.600 ###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PROVINSI
PEMERINTAH PERMUKIMAN DAN PERUMAHAN
JAWA BARAT
DINAS PERMUKIMAN
BALAI PENGELOLAAN DAN PERUMAHAN
DAN PELAYANAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN DAN
Jl. Kawaluyaan Indah No. PELAYANAN
4 Telp. (022) 7332078 –PERUMAHAN
7319735 JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D Fax
U N: (022)
G – 40286
7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 5
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.063
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.326
-
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair 61,753,721.43 3.057 1.390
b. Pekerjaan Mekanikal 20,808,200.00 1.030 0.087
c. Pekerjaan Elektrikal 25,807,200.00 1.277 1.083
-
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan 53,939,099.20 2.670 2.615
b. Pekerjaan Struktur 579,519,579.90 28.684 25.846
-
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding 211,245,209.00 10.456 6.306
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 -
c. Pekerjaan Lantai 139,564,150.00 6.908 -
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 1.719
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
-
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair 14,332,800.00 0.709 -
b. Pekerjaan Mekanikal 5,770,150.00 0.286 -
c. Pekerjaan Elektrikal 31,053,480.00 1.537 0.174
-
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap 35,951,201.86 1.779 0.257
1 2 3 4 5
Sisa Waktu Pelaksanaan : 56.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.052 0.794
- -
- -
- -
0.000 6.780
- -
- -
- -
- 8.555
0.733 3.048
PROGRES PEKERJAAN (%)
Sampai Dengan
Bulan Ini
Bulan Ini
6 7
- 5.480
0.509 3.572
0.501 0.827
- -
- -
1.613 3.002
0.067 0.154
0.055 1.138
- -
- -
- -
0.055 2.670
2.607 28.453
- -
- -
3.370 9.676
0.445 0.445
2.093 2.093
4.832 6.552
- -
PROGRES PEKERJAAN (%)
Sampai Dengan
Bulan Ini
Bulan Ini
6 7
-
-
0.377 0.377
0.025 0.025
0.494 0.668
- -
- -
0.787 1.045
18.615 85.354
PROGRES PEKERJAAN (%)
Sampai Dengan
Bulan Ini
Bulan Ini
6 7
14-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.700
4 Listrik dan Air Kerja Ls 1.000 0.148 0.700
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.700
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 3.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 1.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 2.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 7.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 422.544
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 596.526
3 Pek. Acian m2 994.210 2.101 298.263
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 248.136
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 248.136
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 -
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 20.000
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537 36.000
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 0.500
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
- 4.111 0.951 - 0.951
- 1.744 0.362 - 0.362
- 15.536 4.293 - 4.293
- - - - -
- 1.873 0.496 - 0.496
- 2.268 0.475 - 0.475
- 1.238 0.203 - 0.203
- - 6.780 - 6.780
- -
- -
- 376.759 3.297 - 3.297
- 753.518 2.499 - 2.499
- 608.988 1.287 - 1.287
- 92.160 0.174 - 0.174
- 15.000 0.028 - 0.028
- 144.780 1.270 - 1.270
- - 8.555 - 8.555
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
4.000 7.000 0.275 0.366 0.641
1.000 2.000 0.092 0.092 0.183
3.000 5.000 0.183 0.275 0.458
- 9.000 0.757 - 0.757
- 12.000 0.891 - 0.891
- 1.000 0.049 - 0.049
- 3.000 0.042 - 0.042
- 2.000 0.027 - 0.027
- - - - -
- - 2.316 0.733 3.048
- -
- 16.945 0.075 - 0.075
- 274.500 3.736 - 3.736
- 48.000 0.395 - 0.395
- 171.600 1.274 - 1.274
- - - - -
- - - - -
- - - - -
- - - - -
- - 5.480 - 5.480
- -
- 160.890 0.987 - 0.987
- 9.330 0.036 - 0.036
- 14.670 0.041 - 0.041
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
59.000 59.000 - 0.190 0.190
33.997 339.970 0.822 0.091 0.913
33.997 339.970 1.139 0.127 1.265
- 9.000 0.038 - 0.038
26.100 26.100 - 0.101 0.101
- - 3.063 0.509 3.572
- -
418.590 418.590 - 0.458 0.458
- - - - -
- 350.000 0.326 - 0.326
35.000 35.000 - 0.043 0.043
- - 0.326 0.501 0.827
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
2.000 3.000 0.163 0.326 0.489
- 2.000 0.078 - 0.078
4.000 4.000 - 0.546 0.546
3.000 3.000 - 0.423 0.423
1.000 8.000 0.096 0.014 0.109
3.000 3.000 - 0.033 0.033
8.000 8.000 - 0.026 0.026
2.000 2.000 - 0.109 0.109
- 1.000 0.455 - 0.455
- 2.000 0.148 - 0.148
- 26.600 0.027 - 0.027
- 70.000 0.081 - 0.081
- 28.500 0.193 - 0.193
2.000 2.000 - 0.010 0.010
- 15.000 0.038 - 0.038
- 28.000 0.109 - 0.109
1.000 1.000 - 0.126 0.126
- - 1.390 1.613 3.002
- -
3.000 6.000 0.067 0.067 0.134
- - - - -
- 1.000 0.020 - 0.020
- -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - 0.087 0.067 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- 2.000 0.049 - 0.049
- 4.000 0.011 - 0.011
- 7.000 0.019 - 0.019
2.000 2.000 - 0.025 0.025
- 44.000 0.265 - 0.265
- - - - -
- 8.000 0.155 - 0.155
- 24.000 0.126 - 0.126
- - - - -
- 13.000 0.013 - 0.013
- 5.000 0.006 - 0.006
- 18.000 0.163 - 0.163
- 4.000 0.030 - 0.030
- 4.000 0.038 - 0.038
1.000 4.000 0.022 0.007 0.030
2.000 4.000 0.017 0.017 0.035
- 40.000 0.085 - 0.085
- 40.000 0.085 - 0.085
- - - - -
2.000 2.000 - 0.005 0.005
- - 1.083 0.055 1.138
- -
- -
- -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- 1.000 0.001 - 0.001
- 102.400 0.460 - 0.460
- 376.834 2.104 - 2.104
10.000 10.000 - 0.055 0.055
- 33.720 0.050 - 0.050
- - 2.615 0.055 2.670
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
6.000 10.000 0.140 0.210 0.350
18.000 18.000 - 0.018 0.018
- 12.000 1.906 - 1.906
- 2.000 0.130 - 0.130
- 6.000 0.985 - 0.985
- 11.52 2.167 - 2.167
- 6.34 1.698 - 1.698
- 4.60 1.330 - 1.330
- 3.78 0.875 - 0.875
0.32 0.32 - 0.053 0.053
- 8.91 1.865 - 1.865
- 13.52 3.181 - 3.181
- 3.20 0.710 - 0.710
- 26.10 7.213 - 7.213
40.00 250.00 2.695 0.513 3.208
7.53 7.53 - 1.813 1.813
- 1.55 0.323 - 0.323
- 2.38 0.630 - 0.630
- - 25.846 2.607 28.453
- -
- -
74.57 497.11 3.698 0.653 4.350
349.13 945.66 1.978 1.158 3.136
648.84 947.11 0.630 1.371 2.002
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
100.00 100.00 - 0.189 0.189
- - - - -
- - - - -
- - 6.306 3.370 9.676
- -
- - - - -
- - - - -
- - - - -
- - - - -
6.00 6.00 - 0.445 0.445
- - - - -
- - - - -
- - - - -
- - - - -
6.00 6.00 - 0.445 0.445
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
11.25 11.25 - 0.050 0.050
150.00 150.00 - 2.043 2.043
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
161.25 161.25 - 2.093 2.093
- -
106.34 354.48 1.719 0.737 2.456
354.48 354.48 - 2.176 2.176
39.00 39.00 - 0.151 0.151
13.00 13.00 - 0.036 0.036
68.00 68.00 - 0.185 0.185
175.00 175.00 - 0.470 0.470
279.28 279.28 - 1.040 1.040
9.00 9.00 - 0.038 0.038
(248.14) - 1.719 4.832 6.552
- -
- - - - -
- - - - -
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
4.00 4.00 - 0.004 0.004
58.00 58.00 - 0.067 0.067
10.00 10.00 - 0.039 0.039
10.00 10.00 - 0.068 0.068
- - - - -
1.00 1.00 - 0.199 0.199
- - - 0.377 0.377
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- - - - -
- - - - -
- - - - -
- - - - -
1.00 1.00 - 0.012 0.012
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1.00 1.00 - 0.012 0.012
- - - 0.025 0.025
- -
1.00 1.00 - 0.025 0.025
- - - - -
- - - - -
- - - - -
- - - - -
30.00 50.00 0.120 0.181 0.301
- - - - -
10.00 10.00 - 0.193 0.193
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
6.00 6.00 - 0.007 0.007
6.00 6.00 - 0.006 0.006
- 12.00 0.015 - 0.015
- -
2.00 2.00 - 0.015 0.015
- 4.00 0.038 - 0.038
- - - - -
16.00 16.00 - 0.034 0.034
16.00 16.00 - 0.034 0.034
(36.00) - 0.174 0.494 0.668
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
5.00 5.00 - 0.034 0.034
- - - - -
15.00 15.00 - 0.089 0.089
- - - - -
0.50 1.00 0.105 0.105 0.210
1.00 1.00 - 0.449 0.449
- -
- 22.10 0.152 - 0.152
33.15 33.15 - 0.110 0.110
- - - - -
- - - - -
- - - -
- 0.257 0.787 1.045
Bandung, 14-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.550
4 Listrik dan Air Kerja Ls 1.000 0.148 0.550
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.500
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 -
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 -
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 8.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 10.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 24.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 1.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 -
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 -
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 1.890
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 -
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 -
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 248.555
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 -
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 -
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 -
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 -
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 -
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
- 4.111 0.951 - 0.951
- 1.744 0.362 - 0.362
- 15.536 4.293 - 4.293
- - - - -
- 1.873 0.496 - 0.496
- 2.268 0.475 - 0.475
- 1.238 0.203 - 0.203
- - 6.780 - 6.780
- -
- -
- 376.759 3.297 - 3.297
- 753.518 2.499 - 2.499
- 608.988 1.287 - 1.287
- 92.160 0.174 - 0.174
15.000 15.000 - 0.028 0.028
- 144.780 1.270 - 1.270
- - 8.526 0.028 8.555
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
3.000 3.000 - 0.275 0.275
1.000 1.000 - 0.092 0.092
2.000 2.000 - 0.183 0.183
1.000 9.000 0.673 0.084 0.757
2.000 12.000 0.742 0.148 0.891
- 1.000 0.049 - 0.049
- 3.000 0.042 - 0.042
- 2.000 0.027 - 0.027
- - - - -
- - 1.534 0.782 2.316
- -
- 16.945 0.075 - 0.075
- 274.500 3.736 - 3.736
24.000 48.000 0.197 0.197 0.395
- 171.600 1.274 - 1.274
- - - - -
- - - - -
- - - - -
- - - - -
- - 5.282 0.197 5.480
- -
- 160.890 0.987 - 0.987
- 9.330 0.036 - 0.036
- 14.670 0.041 - 0.041
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- 305.973 0.822 - 0.822
- 305.973 1.139 - 1.139
- 9.000 0.038 - 0.038
- - - - -
- - 3.063 - 3.063
- -
- - - - -
- - - - -
- 350.000 0.326 - 0.326
- - - - -
- - 0.326 - 0.326
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
- 1.000 0.163 - 0.163
1.000 2.000 0.039 0.039 0.078
- - - - -
- - - - -
7.000 7.000 - 0.096 0.096
- - - - -
- - - - -
- - - - -
- 1.000 0.455 - 0.455
- 2.000 0.148 - 0.148
- 26.600 0.027 - 0.027
- 70.000 0.081 - 0.081
- 28.500 0.193 - 0.193
- - - - -
- 15.000 0.038 - 0.038
- 28.000 0.109 - 0.109
- - - - -
- - 1.254 0.135 1.390
- -
- 3.000 0.067 - 0.067
- - - - -
- 1.000 0.020 - 0.020
- -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - 0.087 - 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
1.000 2.000 0.025 0.025 0.049
4.000 4.000 - 0.011 0.011
7.000 7.000 - 0.019 0.019
- - - - -
- 44.000 0.265 - 0.265
- - - - -
- 8.000 0.155 - 0.155
- 24.000 0.126 - 0.126
- - - - -
- 13.000 0.013 - 0.013
- 5.000 0.006 - 0.006
- 18.000 0.163 - 0.163
- 4.000 0.030 - 0.030
- 4.000 0.038 - 0.038
- 3.000 0.022 - 0.022
- 2.000 0.017 - 0.017
- 40.000 0.085 - 0.085
- 40.000 0.085 - 0.085
- - - - -
- - - - -
- - 1.028 0.055 1.083
- -
- -
- -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- 1.000 0.001 - 0.001
- 102.400 0.460 - 0.460
- 376.834 2.104 - 2.104
- - - - -
- 33.720 0.050 - 0.050
- - 2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
4.000 4.000 - 0.140 0.140
- - - - -
- 12.000 1.906 - 1.906
- 2.000 0.130 - 0.130
2.000 6.000 0.657 0.328 0.985
- 11.52 2.167 - 2.167
- 6.34 1.698 - 1.698
- 4.60 1.330 - 1.330
1.89 3.78 0.437 0.437 0.875
- - - - -
8.91 8.91 - 1.865 1.865
- 13.52 3.181 - 3.181
- 3.20 0.710 - 0.710
- 26.10 7.213 - 7.213
- 210.00 2.695 - 2.695
- - - - -
1.55 1.55 - 0.323 0.323
2.38 2.38 - 0.630 0.630
- - 22.123 3.723 25.846
- -
- -
173.99 422.54 2.175 1.523 3.698
596.53 596.53 - 1.978 1.978
298.26 298.26 - 0.630 0.630
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - 2.175 4.131 6.306
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
248.14 248.14 - 1.719 1.719
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
248.14 248.14 - 1.719 1.719
- -
- - - - -
- - - - -
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
20.00 20.00 - 0.120 0.120
- - - - -
- - - - -
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
12.00 12.00 - 0.015 0.015
- -
- - - - -
4.00 4.00 - 0.038 0.038
- - - - -
- - - - -
- - - - -
36.00 36.00 - 0.174 0.174
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
- - - - -
- - - - -
- - - - -
- - - - -
0.50 0.50 - 0.105 0.105
- - - - -
- -
22.10 22.10 - 0.152 0.152
- - - - -
- - - - -
- - - - -
- - - -
- - 0.257 0.257
Bandung, 17-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.282
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.063
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.326
#REF!
PEKERJAAN MEKANIKAL & ELEKTRIKAL #REF!
a. Pekerjaan Sanitair 61,753,721.43 3.057 1.254
b. Pekerjaan Mekanikal 20,808,200.00 1.030 0.087
c. Pekerjaan Elektrikal 25,807,200.00 1.277 1.028
#REF!
B. BAGIAN KONTRAK II BANGUNAN DEPAN #REF!
PEKERJAAN STRUKTUR #REF!
a. Pekerjaan Galian dan Urugan 53,939,099.20 2.670 2.615
b. Pekerjaan Struktur 579,519,579.90 28.684 22.123
#REF!
PEKERJAAN ARSITEKTUR #REF!
a. Pekerjaan Dinding 211,245,209.00 10.456 2.175
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 #REF!
c. Pekerjaan Lantai 139,564,150.00 6.908 #REF!
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 #REF!
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 #REF!
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 56.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.090 0.742
#REF! -
#REF! -
#REF! -
- 6.780
#REF!
#REF!
#REF!
0.028 8.555
0.782 2.316
PROGRES PEKERJAAN (%)
Sampai Dengan
Bulan Ini
Bulan Ini
6 7
0.197 5.480
- 3.063
- 0.326
#REF!
#REF!
0.135 1.390
- 0.087
0.055 1.083
#REF!
#REF!
#REF!
- 2.615
3.723 25.846
#REF!
#REF!
4.131 6.306
#REF! -
#REF! -
#REF! 1.719
#REF! -
PROGRES PEKERJAAN (%)
Sampai Dengan
Bulan Ini
Bulan Ini
6 7
#REF! -
#REF! -
#REF! 0.174
#REF!
#REF!
#REF! 0.257
#REF! 66.739
PROGRES PEKERJAAN (%)
Sampai Dengan
Bulan Ini
Bulan Ini
6 7
17-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TIM
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Bulan ke - 5 ( Lima )
Periode
20-Sep-2016 s/d 17-Oct-2016
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
48.687
F
0.890 0.890 0.890 42.672
3.585 3.585 3.585 3.58545.724
3.585 3.585
I 34.806
39.582
T 27.910
T 27.910
R 20.401
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.307 1.398 1.363 0.000 2.701 2.957 7.584 3.064 5.054 25.553 8.021 6.142 2.964 23.886
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687 55.447
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
3.414 2.883 2.446 11.292 3.302 2.347 5.403 0.000 0.000 0.000 0.00 ###
58.861 61.743 64.189 66.739 0.000 0.000 0.000 0.000 0.000 0.000 0.00 ###
-0.584 -2.882 -6.652 -7.147 -78.479 -83.071 -87.800 -90.715 -94.929 -97.300 -98.600 ###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
TIM
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Bulan ke - 4 ( Empat )
Periode
23-Aug-2016 s/d 19-Sep-2016
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
48.687
F
0.890 0.890 0.890 42.672
3.585 3.585 3.585 3.585 45.724
3.585 3.585
I 34.806
39.582
T 27.910
T 27.910
R 20.401
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964 6.759
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687 55.447
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.400
4 Listrik dan Air Kerja Ls 1.000 0.148 0.400
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.350
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 569.748
3 Pek. Acian m2 608.988 1.287 443.988
4 Pek. Acian Kolom m2 92.160 0.174 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 59.980
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 -
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 -
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 (1.000)
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 -
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 -
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 -
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 -
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 86.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 -
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 -
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 -
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 -
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 -
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 -
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 -
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 -
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 -
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 -
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 -
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 -
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 -
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 -
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 4.000
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 -
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 -
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 -
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 -
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 -
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 -
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
15 Pek. Instalasi CCTV titk 6.000 0.045 -
16 Pek. Instalasi Telepon titik 4.000 0.035 -
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 -
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 -
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 -
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 -
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 -
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 -
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 -
13 Pek. B3 (Balok) m3 3.200 0.710 -
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 5.660
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 -
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 -
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 -
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 -
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 #REF!
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 #REF!
PEKERJAAN MEKANIKAL & ELEKTRIKAL #REF!
a. Pekerjaan Sanitair #REF!
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 #REF!
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 #REF!
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 #REF!
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 #REF!
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 #REF!
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 #REF!
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 #REF!
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 #REF!
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 #REF!
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 #REF!
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 #REF!
Sub Jumlah Pekerjaan Sanitair 0.709 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal #REF!
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 #REF!
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 #REF!
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 #REF!
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 #REF!
7 Pek. SDP AC bh 1.000 0.012 #REF!
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 #REF!
9 Pek. Pilot Lamp buah 3.000 0.002 #REF!
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 #REF!
11 Pek. Selector Switch buah 1.000 0.008 #REF!
12 Pek. Amper Meter buah 3.000 0.029 #REF!
13 Pek. Volt Meter buah 1.000 0.010 #REF!
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 #REF!
Sub Jumlah Pekerjaan Mekanikal 0.286 #REF!
c. Pekerjaan Elektrikal #REF!
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 #REF!
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 #REF!
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 #REF!
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 #REF!
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 #REF!
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 #REF!
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 #REF!
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 #REF!
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 #REF!
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
- 4.111 0.951 - 0.951
- 1.744 0.362 - 0.362
- 15.536 4.293 - 4.293
- - - - -
- 1.873 0.496 - 0.496
- 2.268 0.475 - 0.475
- 1.238 0.203 - 0.203
- - 6.780 - 6.780
- -
- -
- 376.759 3.297 - 3.297
183.770 753.518 1.889 0.609 2.499
165.000 608.988 0.938 0.349 1.287
92.160 92.160 - 0.174 0.174
- - - - -
84.800 144.780 0.526 0.744 1.270
- - 6.651 1.876 8.526
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- - - - -
- - - - -
- - - - -
9.000 8.000 (0.084) 0.757 0.673
10.000 10.000 - 0.742 0.742
1.000 1.000 - 0.049 0.049
3.000 3.000 - 0.042 0.042
2.000 2.000 - 0.027 0.027
- - - - -
- - (0.084) 1.618 1.534
- -
- 16.945 0.075 - 0.075
188.000 274.500 1.177 2.559 3.736
24.000 24.000 - 0.197 0.197
171.600 171.600 - 1.274 1.274
- - - - -
- - - - -
- - - - -
- - - - -
- - 1.252 4.030 5.282
- -
- 160.890 0.987 - 0.987
- 9.330 0.036 - 0.036
- 14.670 0.041 - 0.041
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- 305.973 0.822 - 0.822
- 305.973 1.139 - 1.139
- 9.000 0.038 - 0.038
- - - - -
- - 3.063 - 3.063
- -
- - - - -
- - - - -
350.000 350.000 - 0.326 0.326
- - - - -
- - - 0.326 0.326
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
1.000 1.000 - 0.163 0.163
1.000 1.000 - 0.039 0.039
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1.000 1.000 - 0.455 0.455
2.000 2.000 - 0.148 0.148
26.600 26.600 - 0.027 0.027
70.000 70.000 - 0.081 0.081
28.500 28.500 - 0.193 0.193
- - - - -
15.000 15.000 - 0.038 0.038
28.000 28.000 - 0.109 0.109
- - - - -
- - - 1.254 1.254
- -
3.000 3.000 - 0.067 0.067
- - - - -
1.000 1.000 - 0.020 0.020
- -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - 0.087 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
1.000 1.000 - 0.025 0.025
- - - - -
- - - - -
- - - - -
40.000 44.000 0.024 0.241 0.265
- - - - -
8.000 8.000 - 0.155 0.155
24.000 24.000 - 0.126 0.126
- - - - -
13.000 13.000 - 0.013 0.013
5.000 5.000 - 0.006 0.006
18.000 18.000 - 0.163 0.163
4.000 4.000 - 0.030 0.030
4.000 4.000 - 0.038 0.038
3.000 3.000 - 0.022 0.022
2.000 2.000 - 0.017 0.017
40.000 40.000 - 0.085 0.085
40.000 40.000 - 0.085 0.085
- - - - -
- - - - -
- - 0.024 1.004 1.028
- -
- -
- -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- 1.000 0.001 - 0.001
- 102.400 0.460 - 0.460
- 376.834 2.104 - 2.104
- - - - -
- 33.720 0.050 - 0.050
- - 2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- - - - -
- - - - -
- 12.000 1.906 - 1.906
2.000 2.000 - 0.130 0.130
- 4.000 0.657 - 0.657
- 11.52 2.167 - 2.167
- 6.34 1.698 - 1.698
4.60 4.60 - 1.330 1.330
1.89 1.89 - 0.437 0.437
- - - - -
- - - - -
13.52 13.52 - 3.181 3.181
3.20 3.20 - 0.710 0.710
20.44 26.10 1.564 5.649 7.213
- 210.00 2.695 - 2.695
- - - - -
- - - - -
- - - - -
- - 10.686 11.437 22.123
- -
- -
248.56 248.56 - 2.175 2.175
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - 2.175 2.175
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - #REF! #REF! #REF!
#REF! -
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - -
Bandung, 19-Sep-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 126.000
Sisa Waktu Pelaksanaan : 84.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
5 6 7
#REF! #REF! 1.534
#REF! #REF! 5.282
#REF! #REF! 3.063
#REF! #REF! 0.326
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! 1.254
#REF! #REF! 0.087
#REF! #REF! 1.028
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! 2.615
#REF! #REF! 22.123
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! 2.175
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
PROGRES PEKERJAAN (%)
5 6 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
5 6 7
Bandung, 19-Sep-2016
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 #REF!
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 #REF!
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 #REF!
4 Listrik dan Air Kerja Ls 1.000 0.148 #REF!
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 #REF!
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 #REF!
II. PEKERJAAN KONSTRUKSI #REF!
A. BAGIAN KONTRAK I BANGUNAN BELAKANG #REF!
PEKERJAAN STRUKTUR #REF!
b. Pekerjaan Struktur #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 #REF!
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 #REF!
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 #REF!
4 Pek. Pemasangan waterproofing m2 136.400 0.384 #REF!
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 #REF!
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 #REF!
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 #REF!
Sub Jumlah Pekerjaan Struktur 7.164 #REF!
PEKERJAAN ARSITEKTUR #REF!
a. Pekerjaan Dinding #REF!
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 #REF!
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 #REF!
3 Pek. Acian m2 608.988 1.287 #REF!
4 Pek. Acian Kolom m2 92.160 0.174 #REF!
5 Pek. Acian Listplang Beton m2 15.000 0.028 #REF!
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 #REF!
Sub Jumlah Pekerjaan Dinding 8.555 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu #REF!
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 #REF!
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 #REF!
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 #REF!
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 #REF!
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 #REF!
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 #REF!
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 #REF!
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 #REF!
9 Pek. Pas. Railling Tangga m' 11.050 0.109 #REF!
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 #REF!
c. Pekerjaan Lantai #REF!
1 Pek. Urugan Pasir Urug m3 16.945 0.075 #REF!
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 #REF!
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 #REF!
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 #REF!
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 #REF!
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 #REF!
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 #REF!
8 Pek. Pemasangan waterproofing m2 22.000 0.062 #REF!
Sub Jumlah Pekerjaan Lantai 6.066 #REF!
d. Pekerjaan Atap dan Plafond #REF!
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 #REF!
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 #REF!
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 #REF!
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 #REF!
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 #REF!
7 Pek. Jurai Talang m2 9.000 0.038 #REF!
8 Pek. Flasing m2 26.100 0.101 #REF!
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 #REF!
e. Pekerjaan Pengecatan dan Laburan #REF!
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 #REF!
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 #REF!
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 #REF!
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 #REF!
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL #REF!
a. Pekerjaan Sanitair #REF!
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 #REF!
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 #REF!
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 #REF!
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 #REF!
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 #REF!
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 #REF!
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 #REF!
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 #REF!
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 #REF!
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 #REF!
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 #REF!
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 #REF!
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 #REF!
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 #REF!
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 #REF!
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 #REF!
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 #REF!
Sub Jumlah Pekerjaan Sanitair 3.057 #REF!
b. Pekerjaan Mekanikal #REF!
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 #REF!
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 #REF!
4 Pek. Grounding Unit 1.000 0.020 #REF!
5 Pek. Pemasangan Smoke Detector - #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 #REF!
- Heat Detector Unit 2.000 0.007 #REF!
- Bel Alarm Unit 1.000 0.007 #REF!
- Break Glass Unit 1.000 0.006 #REF!
- Hambatan Tepi Unit 2.000 0.005 #REF!
- CTBFA Unit 1.000 0.171 #REF!
6 Pek. Instalasi CCTV - #REF!
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 #REF!
7 Pek. Pasang Alarm Unit 1.000 0.074 #REF!
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 #REF!
9 Pek. Test Comisioning Unit 1.000 0.012 #REF!
Sub Jumlah Pekerjaan Mekanikal 1.030 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal #REF!
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 #REF!
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 #REF!
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 #REF!
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 #REF!
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 #REF!
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 #REF!
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 #REF!
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 #REF!
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 #REF!
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 #REF!
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 #REF!
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 #REF!
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 #REF!
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 #REF!
15 Pek. Instalasi CCTV titk 6.000 0.045 #REF!
16 Pek. Instalasi Telepon titik 4.000 0.035 #REF!
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 #REF!
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 #REF!
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 #REF!
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 #REF!
Sub Jumlah Pekerjaan Elektrikal 1.277 #REF!
B. BAGIAN KONTRAK II BANGUNAN DEPAN #REF!
PEKERJAAN STRUKTUR #REF!
a. Pekerjaan Galian dan Urugan #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 #REF!
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 #REF!
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 #REF!
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 #REF!
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 #REF!
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur #REF!
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 #REF!
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 #REF!
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 #REF!
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 #REF!
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 #REF!
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 #REF!
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 #REF!
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 #REF!
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 #REF!
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 #REF!
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 #REF!
12 Pek. B1 (Balok) m3 13.520 3.181 #REF!
13 Pek. B3 (Balok) m3 3.200 0.710 #REF!
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 #REF!
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 #REF!
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 #REF!
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 #REF!
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 #REF!
Sub Jumlah Pekerjaan Struktur 28.684 #REF!
PEKERJAAN ARSITEKTUR #REF!
a. Pekerjaan Dinding #REF!
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 #REF!
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 #REF!
3 Pek. Acian m2 994.210 2.101 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 #REF!
5 Pek. Acian Listplang Beton m2 15.000 0.028 #REF!
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 #REF!
Sub Jumlah Pekerjaan Dinding 10.456 #REF!
b. Pekerjaan Jendela dan Pintu #REF!
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 #REF!
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 #REF!
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 #REF!
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 #REF!
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 #REF!
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 #REF!
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 #REF!
8 Pek. Pas. Railling Tangga m' 12.480 0.154 #REF!
9 Pek. Pas. Railling Tangga m' 12.480 0.124 #REF!
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai #REF!
1 Pek. Urugan Pasir Urug m3 11.250 0.050 #REF!
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 #REF!
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 #REF!
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 #REF!
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 #REF!
7 Pek. Floor Hardener m2 230.200 0.855 #REF!
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 #REF!
11 Pek. Pemasangan waterproofing m2 15.000 0.042 #REF!
Sub Jumlah Pekerjaan Lantai 6.908 #REF!
d. Pekerjaan Atap dan Plafond #REF!
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 #REF!
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 #REF!
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 #REF!
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 #REF!
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 #REF!
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 #REF!
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 #REF!
9 Pek Talang Datar m2 9.000 0.038 #REF!
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 #REF!
e. Pekerjaan Pengecatan dan Laburan #REF!
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 #REF!
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 #REF!
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 #REF!
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 #REF!
PEKERJAAN MEKANIKAL & ELEKTRIKAL #REF!
a. Pekerjaan Sanitair #REF!
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 #REF!
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 #REF!
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 #REF!
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 #REF!
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 #REF!
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 #REF!
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 #REF!
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 #REF!
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 #REF!
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 #REF!
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 #REF!
Sub Jumlah Pekerjaan Sanitair 0.709 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal #REF!
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 #REF!
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 #REF!
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 #REF!
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 #REF!
7 Pek. SDP AC bh 1.000 0.012 #REF!
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 #REF!
9 Pek. Pilot Lamp buah 3.000 0.002 #REF!
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 #REF!
11 Pek. Selector Switch buah 1.000 0.008 #REF!
12 Pek. Amper Meter buah 3.000 0.029 #REF!
13 Pek. Volt Meter buah 1.000 0.010 #REF!
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 #REF!
Sub Jumlah Pekerjaan Mekanikal 0.286 #REF!
c. Pekerjaan Elektrikal #REF!
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 #REF!
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 #REF!
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 #REF!
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 #REF!
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 #REF!
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 #REF!
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 #REF!
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 #REF!
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 #REF!
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
#REF! 4.111 #REF! #REF! #REF!
#REF! 1.744 #REF! #REF! #REF!
#REF! 15.536 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! 1.873 #REF! #REF! #REF!
#REF! 2.268 #REF! #REF! #REF!
#REF! 1.238 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! -
#REF! 376.759 #REF! #REF! #REF!
#REF! 569.748 #REF! #REF! #REF!
#REF! 443.988 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! 59.980 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! (1.000) #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! 16.945 #REF! #REF! #REF!
#REF! 86.500 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! 160.890 #REF! #REF! #REF!
#REF! 9.330 #REF! #REF! #REF!
#REF! 14.670 #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - #REF! #REF! #REF!
#REF! 305.973 #REF! #REF! #REF!
#REF! 305.973 #REF! #REF! #REF!
#REF! 9.000 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! 4.000 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! -
#REF! -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! 1.000 #REF! #REF! #REF!
#REF! 102.400 #REF! #REF! #REF!
#REF! 376.834 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! 33.720 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! 12.000 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! 4.000 #REF! #REF! #REF!
#REF! 11.52 #REF! #REF! #REF!
#REF! 6.34 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! 5.66 #REF! #REF! #REF!
#REF! 210.00 #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - #REF! #REF! #REF!
#REF! -
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - -
Bandung, 22-Aug-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Bulan ke - 3 ( Tiga )
Periode
19-Jul-2016 s/d 22-Aug-2016
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
F
0.890 0.890 0.890 42.672
3.585 3.585 3.585 3.585 3.585 3.585
I 34.806
T 27.910
T 27.910
31.561
R 20.401
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PROVINSI
PEMERINTAH PERMUKIMAN DAN PERUMAHAN
JAWA BARAT
DINAS PERMUKIMAN
BALAI PENGELOLAAN DAN PERUMAHAN
DAN PELAYANAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN DAN
Jl. Kawaluyaan Indah No. PELAYANAN
4 Telp. (022) 7332078 –PERUMAHAN
7319735 JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D Fax
U N: (022)
G – 40286
7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 98.000
Sisa Waktu Pelaksanaan : 112.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
5 6 7
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
PROGRES PEKERJAAN (%)
5 6 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
5 6 7
Bandung, 22-Aug-2016
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 #REF!
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 #REF!
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 #REF!
4 Listrik dan Air Kerja Ls 1.000 0.148 #REF!
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 #REF!
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 #REF!
II. PEKERJAAN KONSTRUKSI #REF!
A. BAGIAN KONTRAK I BANGUNAN BELAKANG #REF!
PEKERJAAN STRUKTUR #REF!
b. Pekerjaan Struktur #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 #REF!
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 #REF!
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 #REF!
4 Pek. Pemasangan waterproofing m2 136.400 0.384 #REF!
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 #REF!
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 #REF!
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 #REF!
Sub Jumlah Pekerjaan Struktur 7.164 #REF!
PEKERJAAN ARSITEKTUR #REF!
a. Pekerjaan Dinding #REF!
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 #REF!
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 #REF!
3 Pek. Acian m2 608.988 1.287 #REF!
4 Pek. Acian Kolom m2 92.160 0.174 #REF!
5 Pek. Acian Listplang Beton m2 15.000 0.028 #REF!
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 #REF!
Sub Jumlah Pekerjaan Dinding 8.555 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu #REF!
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 #REF!
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 #REF!
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 #REF!
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 #REF!
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 #REF!
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 #REF!
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 #REF!
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 #REF!
9 Pek. Pas. Railling Tangga m' 11.050 0.109 #REF!
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 #REF!
c. Pekerjaan Lantai #REF!
1 Pek. Urugan Pasir Urug m3 16.945 0.075 #REF!
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 #REF!
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 #REF!
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 #REF!
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 #REF!
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 #REF!
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 #REF!
8 Pek. Pemasangan waterproofing m2 22.000 0.062 #REF!
Sub Jumlah Pekerjaan Lantai 6.066 #REF!
d. Pekerjaan Atap dan Plafond #REF!
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 #REF!
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 #REF!
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 #REF!
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 #REF!
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 #REF!
7 Pek. Jurai Talang m2 9.000 0.038 #REF!
8 Pek. Flasing m2 26.100 0.101 #REF!
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 #REF!
e. Pekerjaan Pengecatan dan Laburan #REF!
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 #REF!
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 #REF!
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 #REF!
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 #REF!
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL #REF!
a. Pekerjaan Sanitair #REF!
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 #REF!
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 #REF!
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 #REF!
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 #REF!
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 #REF!
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 #REF!
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 #REF!
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 #REF!
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 #REF!
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 #REF!
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 #REF!
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 #REF!
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 #REF!
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 #REF!
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 #REF!
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 #REF!
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 #REF!
Sub Jumlah Pekerjaan Sanitair 3.057 #REF!
b. Pekerjaan Mekanikal #REF!
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 #REF!
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 #REF!
4 Pek. Grounding Unit 1.000 0.020 #REF!
5 Pek. Pemasangan Smoke Detector - #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 #REF!
- Heat Detector Unit 2.000 0.007 #REF!
- Bel Alarm Unit 1.000 0.007 #REF!
- Break Glass Unit 1.000 0.006 #REF!
- Hambatan Tepi Unit 2.000 0.005 #REF!
- CTBFA Unit 1.000 0.171 #REF!
6 Pek. Instalasi CCTV - #REF!
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 #REF!
7 Pek. Pasang Alarm Unit 1.000 0.074 #REF!
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 #REF!
9 Pek. Test Comisioning Unit 1.000 0.012 #REF!
Sub Jumlah Pekerjaan Mekanikal 1.030 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal #REF!
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 #REF!
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 #REF!
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 #REF!
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 #REF!
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 #REF!
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 #REF!
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 #REF!
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 #REF!
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 #REF!
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 #REF!
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 #REF!
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 #REF!
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 #REF!
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 #REF!
15 Pek. Instalasi CCTV titk 6.000 0.045 #REF!
16 Pek. Instalasi Telepon titik 4.000 0.035 #REF!
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 #REF!
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 #REF!
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 #REF!
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 #REF!
Sub Jumlah Pekerjaan Elektrikal 1.277 #REF!
B. BAGIAN KONTRAK II BANGUNAN DEPAN #REF!
PEKERJAAN STRUKTUR #REF!
a. Pekerjaan Galian dan Urugan #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 #REF!
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 #REF!
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 #REF!
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 #REF!
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 #REF!
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur #REF!
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 #REF!
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 #REF!
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 #REF!
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 #REF!
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 #REF!
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 #REF!
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 #REF!
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 #REF!
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 #REF!
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 #REF!
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 #REF!
12 Pek. B1 (Balok) m3 13.520 3.181 #REF!
13 Pek. B3 (Balok) m3 3.200 0.710 #REF!
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 #REF!
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 #REF!
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 #REF!
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 #REF!
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 #REF!
Sub Jumlah Pekerjaan Struktur 28.684 #REF!
PEKERJAAN ARSITEKTUR #REF!
a. Pekerjaan Dinding #REF!
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 #REF!
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 #REF!
3 Pek. Acian m2 994.210 2.101 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 #REF!
5 Pek. Acian Listplang Beton m2 15.000 0.028 #REF!
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 #REF!
Sub Jumlah Pekerjaan Dinding 10.456 #REF!
b. Pekerjaan Jendela dan Pintu #REF!
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 #REF!
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 #REF!
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 #REF!
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 #REF!
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 #REF!
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 #REF!
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 #REF!
8 Pek. Pas. Railling Tangga m' 12.480 0.154 #REF!
9 Pek. Pas. Railling Tangga m' 12.480 0.124 #REF!
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai #REF!
1 Pek. Urugan Pasir Urug m3 11.250 0.050 #REF!
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 #REF!
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 #REF!
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 #REF!
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 #REF!
7 Pek. Floor Hardener m2 230.200 0.855 #REF!
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 #REF!
11 Pek. Pemasangan waterproofing m2 15.000 0.042 #REF!
Sub Jumlah Pekerjaan Lantai 6.908 #REF!
d. Pekerjaan Atap dan Plafond #REF!
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 #REF!
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 #REF!
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 #REF!
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 #REF!
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 #REF!
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 #REF!
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 #REF!
9 Pek Talang Datar m2 9.000 0.038 #REF!
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 #REF!
e. Pekerjaan Pengecatan dan Laburan #REF!
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 #REF!
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 #REF!
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 #REF!
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 #REF!
PEKERJAAN MEKANIKAL & ELEKTRIKAL #REF!
a. Pekerjaan Sanitair #REF!
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 #REF!
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 #REF!
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 #REF!
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 #REF!
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 #REF!
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 #REF!
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 #REF!
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 #REF!
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 #REF!
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 #REF!
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 #REF!
Sub Jumlah Pekerjaan Sanitair 0.709 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal #REF!
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 #REF!
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 #REF!
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 #REF!
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 #REF!
7 Pek. SDP AC bh 1.000 0.012 #REF!
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 #REF!
9 Pek. Pilot Lamp buah 3.000 0.002 #REF!
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 #REF!
11 Pek. Selector Switch buah 1.000 0.008 #REF!
12 Pek. Amper Meter buah 3.000 0.029 #REF!
13 Pek. Volt Meter buah 1.000 0.010 #REF!
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 #REF!
Sub Jumlah Pekerjaan Mekanikal 0.286 #REF!
c. Pekerjaan Elektrikal #REF!
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 #REF!
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 #REF!
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 #REF!
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 #REF!
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 #REF!
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 #REF!
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 #REF!
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 #REF!
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 #REF!
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 #REF!
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - #REF! #REF! #REF!
#REF! -
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! -
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
#REF! - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - #REF! #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
- -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - -
Bandung, 18-Jul-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 63.000
Sisa Waktu Pelaksanaan : 147.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
5 6 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
PROGRES PEKERJAAN (%)
5 6 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
5 6 7
Bandung, 18-Jul-2016
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Bulan ke - 2 ( dua )
Periode
21-Jun-2016 s/d 18-Jul-2016
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
F
0.890 0.890 0.890
42.672
3.585 3.585 3.585 3.585 3.585 3.585
I 34.806
T
T 27.910
R
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
#REF! #REF!
Diperiksa Diperiksa
Konsultan Pengawasan Berkala Konsultan Pengawa
PT. TRIBUANA REKAYASA PT. PURI DIME
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 4 3 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.008
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.408
3 Mobilisasi dan Demobilisasi Ls 1.000 0.136
4 Listrik dan Air Kerja Ls 1.000 0.163
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.272
SUB JUMLAH PEKERJAAN PERSIAPAN 0.987
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.067 1.031
2 Pek. Balok lintel 15 x 15 Cm m3 0.727 0.169
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 13.800 2.430
4 Pek. Kolom Pedestal 25x25 (untuk Tangga) m3 0.808 0.18
4 Pek. Pemasangan waterproofing m2 125.500 0.388
Sub Jumlah Pekerjaan Struktur 4.199
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.621
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.744
3 Pek. Acian m2 608.988 1.413
4 Pek. Acian Kolom m2 92.160 0.191
5 Pek. Acian Listplang Beton m2 15.000 0.031
6 Pek. Pasang dinding keramik warna muda Uk. 30x60Cm m2 144.780 1.48
Sub Jumlah Pekerjaan Dinding 9.480 #REF!
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 6.000 0.603
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.201
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.503
4 Pek. Pemasanagan Daun Pintu Teakwood Uk.130x260 Finishing Melamik (P-5) Unit 1.000 0.14
4 Pek. Pemasangan Jendela Type J-1 Unit 8.000 0.739
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.978
6 Pek. Pemasangan Jendela Type J-3 Unit -
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 6.000 0.091
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 4.000 0.060
9 Pek. Pas. Railling Tangga m' 11.050 0.120
Sub Jumlah Pekerjaan Jendela dan Pintu 3.440
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.08
2 Pek. Lantai Granite 60x60 polos m2 274.500 4.10
3 Pek. Keramik dinding 30x30 warna muda m2 50.500 0.52
6 Pek. Pemasangan Plint Granite Hitam Uk.15x60 m' 171.600 1.40
8 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 22.000 0.35
11 Pek. Pemasangan Paving Blok Natural t=8 m2 108.000 1.02
12 Pek. Pemasangan waterproofing m2 22.000 0.07
Sub Jumlah Pekerjaan Lantai 7.533
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 112.000 0.755
2 Pek. Pasang Nok Metalroof m' 9.330 0.040
3 Pek. Pasang Lisplang Woodplang 20 cm m' 35.000 0.124
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
4 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 225.000 0.772
5 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 225.000 0.920
Sub Jumlah Pekerjaan Atap dan Plafond 2.610
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.503
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.336
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.358
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.048
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.245
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.537
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.086
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.600
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.464
5 Pek. Pemasangan Floor Drain Unit 8.000 0.120
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.037
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.028
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.179
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.500
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.163
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.030
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.089
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.212
14 Pek. Pemasangan Stop Kran Unit 2.000 0.011
Sub Jumlah Pekerjaan Sanitair 3.057
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 9.000 0.220
2 Pek. Pemasangan AC 1 PK setara Panasonic Unit 4.000 0.761
3 Pek. Pemasangan Antena TV Titik 1.000 0.008
4 Pek. Grounding Unit 1.000 0.022
5 Pek. Pemasangan Smoke Detector -
- Smoke Detector Unit 7.000 0.067
- Heat Detector Unit 2.000 0.008
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
- Bel Alarm Unit 1.000 0.008
- Break Glass Unit 1.000 0.007
- Hambatan Tepi Unit 2.000 0.005
- CTBFA Unit 1.000 0.188
6 Pek. Instalasi CCTV -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.489
7 Pek. Pasang Alarm Unit 1.000 0.082
8 Pek. Pasang Pesawat Tlp Panasonic Unit 2.000 0.043
9 Pek. Test Comisioning Unit 1.000 0.014
Sub Jumlah Pekerjaan Mekanikal 1.922
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 1.000 0.027
2 Pek. Pemasangan MCB 10A Unit 2.000 0.006
3 Pek. Pemasangan MCB 6A Unit 4.000 0.012
4 Pek. Pemasangan MCB 3 X 10 A -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 23.000 0.152
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.052
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.191
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.138
9 Pek. Pemasangan lampu 15 watt Unit 15.000 0.069
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 9.000 0.010
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 7.000 0.009
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.179
13 Pek. Pemasangan Antena TV Titik 1.000 0.008
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.042
15 Pek. Instalasi CCTV titk 6.000 0.049
16 Pek. Instalasi Telepon m' 50.000 0.476
Sub Jumlah Pekerjaan Elektrikal 1.420 #REF!
B. BAGIAN KONTRAK II BANGUNAN DEPAN - #REF!
PEKERJAAN STRUKTUR - #REF!
a. Pekerjaan Galian dan Urugan - #REF!
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.505
3 Pek. Pembuangan Tanah Galian sejauh 30 m dan Perataan m3 78.680 0.170
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.060
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
5 Pek. Urugan Tanah Kembali m3 33.720 0.055
8 Pek. Penebangan Pohon, diameter 30 - 50 CM buah 5.000 0.136
Sub Jumlah Pekerjaan Galian dan Urugan 0.927 #REF!
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah titik 8.210 0.316
2 Pek. Pemasangan sulingan air pipa PVC dia 2" 16.000 0.017
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 18.000 2.259
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh -
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh -
6 Pek. Sloof 40x20, K300 (TB1) m3 9.680 1.942
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.504
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.031
9 Pek. Kolom 15 x 15 Cm m3 3.780 1.042
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.056
11 Pek. Ring Balk 1 15x40 (RB1) m3 7.740 2.021
12 Pek. B1 (Balok) m3 6.400 1.743
13 Pek. B2 (Balok) m3 4.800 1.213
14 Pek. B3 (Balok) m3 3.600 0.952
15 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 25.740 4.532
16 Pek. Lantai Basement T=15Cm (Beton K-300) m2 230.200 2.955
17 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.991
Sub Jumlah Pekerjaan Struktur 23.576 #REF!
PEKERJAAN ARSITEKTUR - #REF!
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.777
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.621
3 Pek. Acian m2 994.210 2.308
4 Pek. Acian Kolom m2 181.040 0.375
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
5 Pek. Acian Listplang Beton m2 15.000 0.031
6 Pek. Pasang dinding keramik warna muda Uk. 30x60Cm m2 144.780 1.479
Sub Jumlah Pekerjaan Dinding 12.591 #REF!
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.435
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.196
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 5.000 0.544
4 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 4.000 0.435
5 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 8.000 0.870
6 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 2.000 0.283
7 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-5) -
8 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.457
9 Pek. Pemasangan Jendela type J-2 unit -
10 Pek. Bouvenli Alumunium 4" (BV-1) Unit 6.000 0.106
11 Pek. Bouvenli Alumunium 4" (BV-2) Unit 4.000 0.071
12 Pek. Pas. Railling Tangga m' 12.480 0.170
Sub Jumlah Pekerjaan Jendela dan Pintu 3.565
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.054
2 Pek. Lantai Granite 60x60 polos m2 202.500 3.029
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.307
4 Pek. Acian Listplang Beton m' 132.300 1.083
5 Pek. Pasang dinding keramik warna muda Uk. 30x60Cm -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.908
7 Pek. Floor Hardener m2 230.200 0.938
8 Pek. Pemasangan Kansteen Paving Block m' 129.700 1.220
9 Pek. Pemasangan Paving Blok Natural t=8 -
10 Pek. Pemasangan MCB 35 A Unit 31.200 0.458
11 Pek. Pemasangan waterproofing m2 15.000 0.046
Sub Jumlah Pekerjaan Lantai 8.044
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 292.500 2.226
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 292.500 1.971
3 Pek. Pasang Nok Metalroof m' 39.000 0.166
5 Pek. Pasang Lisplang Woodplang 20 cm m' 60.000 0.179
6 Pek. Pemasangan langit-lagit GRC tebal 9mm m2 235.000 0.806
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 60.000 0.245
9 Pek Talang Datar -
Sub Jumlah Pekerjaan Atap dan Plafond 5.594
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.535
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.466
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.470
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.082
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.552
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 4.000 0.715
2 Pek. Pemasangan Kloset Jongkok Unit 4.000 0.172
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.600
4 Pek. Pemasangan Urinoir ex.Toto Unit 6.000 0.929
5 Pek. Pemasangan Floor Drain Unit 12.000 0.180
6 Pek. Pemasangan Jet Washer Toto Unit 4.000 0.049
7 Pek. Pemasangan Kran ai dia 1/2 Unit 10.000 0.035
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 6.000 0.359
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 18.000 0.020
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.074
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 24.000 0.179
13 Pek. Pemasangan Stop Kran Unit 4.000 0.022
Sub Jumlah Pekerjaan Sanitair 3.335
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 5.000 0.122
2 Pek. Pemasangan AC 1 PK setara Panasonic Unit 1.000 0.190
3 Pek. Pemasangan AC 2 PK setara Panasonic Unit 2.000 0.652
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.019
5 Pek. Instalasi SDP + Accessories bh 1.000 0.014
6 Pek. Pemasangan Box KWH meter bh 1.000 0.014
7 Pek. SDP AC bh 1.000 0.014
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.098
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.027
Sub Jumlah Pekerjaan Mekanikal 1.150
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.054
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.012
3 Pek. Pemasangan MCB 6A Unit 10.000 0.030
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.015
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 43.000 0.284
7 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.052
8 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.191
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 26.000 0.150
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.037
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.009
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 2.000 0.027
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 2.000 0.054
16 Pek. Pemasangan instalasi Stop Kontak Unit 17.000 0.022
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
18 Pek. Pemasangan Antena TV Unit 11.000 0.012
19 Pek. Pemasangan Instalasi stop kontak AC titik 24.000 0.034
18 Pek. Pemasangan Antena TV Titik 2.000 0.016
19 Pek. Pemasangan Instalasi stop kontak AC Unit 3.000 0.031
Sub Jumlah Pekerjaan Elektrikal 1.031
3. POS SATPAM & GROUNDTANK -
a. Pekerjaan Galian dan Urugan -
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.027
3 Pek. Bongkar Bangunan Lama Ls 1.000 0.136
2 Pek. Galian Tanah Biasa Max. Kedalaman 1(Untuk
m Pondasi) m3 3.000 0.013
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 1.280 0.008
5 Pek. Urugan Tanah Kembali m3 1.710 0.003
Sub Jumlah Pekerjaan Galian dan Urugan 0.187
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah (Area Jalan Masuk Utama) m3 2.560 0.099
2 Pek. Pondasi Rolaag Bata m2 21.667 0.106
3 Pek. Sloof 20 x 30 K-175 m3 0.620 0.102
4 Pek. Kolom 15 x 20 K-175 m3 3.090 0.852
5 Pek. Balok 15 x 20 K-175 m3 0.380 0.106
6 Pek. Pas. Shearwall Beton K-225 m3 0.900 0.099
7 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 0.550 0.097
Sub Jumlah Pekerjaan Struktur 1.461
Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 20.450 0.197
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 40.900 0.149
3 Pek. Acian m2 40.900 0.095
4 Pek. Acian Beton m2 7.280 0.015
5 Pek. Jendela Alumunium 4" (JA) m3 3.000 0.073
6 Pek. Daun Pintu Teakwood Uk. 80 x 120 Finishing Melamic (JA) bh 1.000 0.043
7 Pek. Urugan Pasir Urug m3 5.040 0.024
Sub Jumlah Pekerjaan Dinding 0.597
Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 13.310 0.101
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 13.310 0.090
3 Pek. Pasang Lisplang Woodplang 20 cm m' 12.800 0.038
4 Pek. Rangka Plafond Besi Hollow 40.40.2 Modul 60x60 m2 10.240 0.042
5 Pek. Pasang Nok Metalroof m' 8.320 0.034
Sub Jumlah Pekerjaan Atap dan Plafond 0.305
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
Pekerjaan Lantai -
1 Pek. Keramik Lantai 30 x 30 m2 9.920 0.085
Sub Jumlah Pekerjaan Lantai 0.085
Pekerjaan Laburan dan Pengecatan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 17.930 0.022
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 17.930 0.024
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 9.920 0.010
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 12.800 0.017
Sub Jumlah Pekerjaan Laburan dan Pengecatan 0.073
KONTRAK AWAL VOLU
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Bulan Lalu
1 2 4 3 7 8
Pekerjaan Elektrikal -
1 Pek. Pemasangan instalasi Penerangan Titik lampu titik 2.000 0.018
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 2.000 0.007
3 Pek. Pemasangan instalasi Stop Kontak titik 1.000 0.010
4 Pek. Pemasangan Instalasi saklar double ex.broco Unit 1.000 0.001
Sub Jumlah Pekerjaan Elektrikal 0.036
100.00
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan Konsultan Pengawas
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa PT. PURI DIMENSI
9 10 11 12 13
9 10 11 12 13
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! - #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! #REF!
#REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! #REF! - #REF! #REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - #REF! #REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - - -
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF!
#REF!
#REF!
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
#REF!
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Bulan Ini Dengan Dengan Bulan Ini Dengan
Bulan Ini Bulan Lalu Bulan Ini
9 10 11 12 13
#REF!
#REF! - - -
#REF! - - -
#REF! - - -
#REF! - - -
Bandung, 20-Jun-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 35.000
Sisa Waktu Pelaksanaan : 175.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
5 6 7
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
PROGRES PEKERJAAN (%)
5 6 7
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF!
5 6 7
Bandung, 20-Jun-2016
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Bulan ke - 1 ( Satu )
Periode
14-Mar-2018 s/d 20-Jun-2016
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
F
0.890 0.890 0.890
42.672
3.585 3.585 3.585 3.585 3.585 3.585
I 34.806
T
T 27.910
R
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0.000 0.000
#REF!
#REF!
#REF!
Diperiksa Diperiksa
Konsultan Pengawasan Berkala Konsultan Pengawa
PT. TRIBUANA REKAYASA PT. PURI DIME
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
KURVA S MINGGU KE 1
Oktober November
3-8 9-15 16-22 23-29 30-05 06-12 13-19
No Uraian Kegiatan Satuan Volume Bobot
6 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.1 Mg.2 Mg.3 Mg.4 Mg.5 Mg.6 Mg.7
I PEKERJAAN PERSIAPAN
1 Sewa Direksi keet,Los kerja dan Gudang ls 1.00 Err:509 Err:509
2 Papan Nama Proyek ukuran 0.6 x 0.8 m2 bh 1.00 Err:509 Err:509
3 Kistdam Pasir uk.43 x 65 cm bh 400.00 Err:509 Err:509 Err:509
II PEKERJAAN TANAH
Pembersihan dan Stripping/kosrekan m2 1,630.80 Err:509 Err:509
Galian tanah biasa m3 440.43 Err:509 Err:509 Err:509
Timbunan biasa dari sumber galian m3 128.35 Err:509 Err:509
IV PEKERJAAN LAIN-LAIN
Copy atau penggandaan buku/kontrak/laporan set 3.00 Err:509
As built drawing set 3.00 Err:509
Dokumentasi set 3.00 Err:509 Err:509 Err:509
Jumlah Err:509
Rencana Per minggu Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Kumulatif Rencana Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Kemajuan Realisasi Per Minggu 1 1 1 1 1 1 1
Kumulatif realisasi 1 2 3 4 5 6 7
Deviasi Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
mber Desember
20-26 27-03 04-10 `11-17 18-24 25-30
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr 7 hr 6 hr
Mg.8 Mg.9 Mg.10 Mg.11 Mg.12 Mg.13
100
75
50
Err:509 Err:509 Err:509 Err:509
Err:509 25
Err:509
Err:509
Err:509 0
2405
PEMERINTAH KABUPATEN CIANJUR
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jl. Adi Sucipta No. 2 Telp/Fax (0263) 263198
C IAN J U R
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas : PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak : 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak : 14 Maret 2018
Minggu ke - 1 (Satu) Lokasi : Desa Sukaresmi Kec. Kadupandak
Periode
14 Maret 2018 s/d 18 Maret 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
(Rp.)
1 2 4 3 6 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN -
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 5,000,000.00 0.074 1.00 1.000 - 0.074 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 429,220.00 0.006 1.00 1.000 - 0.006 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 5,429,220.00 0.08 - 0.081 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 18,112,500.00 0.269 - - - -
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 23,091,600.00 0.343 - - - -
SUB JUMLAH PEKERJAAN DEWATERING 41,204,100.00 0.61 - - -
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 4,809,825,145.40 71.521 - - - -
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 333,154,646.10 4.954 - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 54,042,292.80 0.804 - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 20,115,826.50 0.299 - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 98,376,222.00 1.463 - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 324,850.00 0.005 - - - -
6 1 bh Papan Operasi Bendung bh 1.00 2,500,000.00 0.037 - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 450,000.00 0.007 - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 2,843,250.00 0.042 - - - -
SUB JUMLAH PEKERJAAN PASANGAN 5,321,632,232.80 79.13 - - -
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK AWAL
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
- 0.081 0.081
- - -
- - -
- - -
- - -
- - -
- - -
- 0.081 0.081
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081
Kumulatif realisasi 0.081
Deviasi - 0.001
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas : PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak : 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak : 14 Maret 2018
Minggu ke - 2 (Dua) Lokasi : Desa Sukaresmi Kec. Kadupandak
Periode
19 Maret 2018 s/d 25 Maret 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 - - - - -
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 - - - - -
SUB JUMLAH PEKERJAAN DEWATERING 0.61 - - -
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 - - - - -
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 - - -
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK AWAL
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
- - -
- 0.074 0.074
- - -
- - -
- - -
- - -
0.081 0.074 0.154
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074
Kumulatif realisasi 0.081 0.154
Deviasi - 0.001 - 0.010
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas : PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak : 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak : 14 Maret 2018
Minggu ke - 3 (Tiga) Lokasi : Desa Sukaresmi Kec. Kadupandak
Periode
26 Maret 2018 s/d 01 April 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 - - - - -
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 - - - - -
SUB JUMLAH PEKERJAAN DEWATERING 0.61 - - -
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 - - - - -
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 - - -
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK AWAL
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
- - -
0.074 0.074 0.147
- - -
- - -
- - -
- - -
0.154 0.074 0.228
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074
Kumulatif realisasi 0.081 0.154 0.228
Deviasi - 0.001 - 0.010 - 0.168
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas : PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak : 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak : 14 Maret 2018
Minggu ke - 4 (Empat) Lokasi : Desa Sukaresmi Kec. Kadupandak
Periode
02 April 2018 s/d 08 April 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 - - - - -
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 - - - - -
SUB JUMLAH PEKERJAAN DEWATERING 0.61 - - -
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 - - - - -
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 - - -
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK AWAL
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
- - -
0.147 0.074 0.221
- - -
- - -
- - -
- - -
0.23 0.07 0.30
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074
Kumulatif realisasi 0.081 0.154 0.228 0.302
Deviasi - 0.001 - 0.010 - 0.168 - 1.79
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas : PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak : 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak : 14 Maret 2018
Minggu ke - 5 (Lima) Lokasi : Desa Sukaresmi Kec. Kadupandak
Periode
09 April 2018 s/d 15 April 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 - - - - -
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 - - - - -
SUB JUMLAH PEKERJAAN DEWATERING 0.61 - - -
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 - - - - -
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 - - -
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK AWAL
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
- - -
0.221 1.274 1.495
- - -
- - -
- - -
- - -
0.302 1.274 1.575
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575
Deviasi - 0.001 - 0.01 - 0.17 - 1.79 - 2.04
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 6 (Enam) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
16 April 2018 s/d 22 April 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 - - - - -
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 - 7.00 7.000 - 0.040 0.040
SUB JUMLAH PEKERJAAN DEWATERING 0.61 - 0.04 0.04
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 - - - - -
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 - - -
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
- 0.040 0.040
1.495 1.200 2.695
- - -
- - -
- - -
- - -
1.575 1.240 2.815
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 7 (Tujuh) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
23 April 2018 s/d 29 April 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 - - - - -
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 7.000 7.000 0.040 - 0.040
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.04 - 0.04
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 - 175.00 175.000 - 2.944 2.944
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 - 2.94 2.94
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK AWAL
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.040 - 0.040
2.695 0.365 3.059
- 2.944 2.944
- - -
- - -
- - -
2.815 3.309 6.125
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 8 (Delapan) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
30 April 2018 s/d 06 Mei 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 - 200.00 200.000 - 0.120 0.120
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 7.000 7.00 14.000 0.040 0.040 0.080
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.04 0.16 0.20
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 175.000 503.38 678.375 2.944 8.469 11.413
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 2.94 8.47 11.41
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.040 0.160 0.200
3.059 0.240 3.299
2.944 8.469 11.413
- - -
- - -
- - -
6.125 8.869 14.993
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 9 (Sembilan) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
07 Mei 2018 s/d 13 Mei 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 200.000 200.000 0.120 - 0.120
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 14.000 7.00 21.000 0.080 0.040 0.120
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.20 0.04 0.24
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 678.375 503.38 1,181.750 11.413 8.469 19.883
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - - - - -
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 11.41 8.47 19.88
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.200 0.040 0.240
3.299 0.120 3.419
11.413 8.469 19.883
- - -
- - -
- - -
14.993 8.629 23.623
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak : 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak : 14 Maret 2018
Minggu ke - 10 (Sepuluh) Lokasi : Desa Sukaresmi Kec. Kadupandak
Periode
14 Mei 2018 s/d 20 Mei 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 200.000 250.00 450.000 0.120 0.150 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 21.000 7.00 28.000 0.120 0.040 0.160
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.24 0.19 0.43
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,181.750 250.00 1,431.750 19.883 4.206 24.089
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 - 25.00 25.000 - 0.022 0.022
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - - - - -
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 19.88 4.23 24.11
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.240 0.190 0.430
3.419 0.072 3.491
19.883 4.228 24.110
- - -
- - -
- - -
23.623 4.490 28.112
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
0
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 11 (Sebelas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
21 Mei 2018 s/d 27 Mei 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 28.000 7.00 35.000 0.160 0.040 0.200
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.43 0.04 0.47
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,431.750 55.00 1,486.750 24.089 0.925 25.014
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 25.000 15.25 40.250 0.022 0.013 0.035
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 - 8.00 8.000 - 0.008 0.008
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 24.11 0.95 25.06
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.430 0.040 0.470
3.491 0.265 3.757
24.110 0.946 25.057
- - -
- - -
- - -
28.112 1.252 29.364
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252
29.364
- 0.128
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 12 (Dua Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
28 Mei 2018 s/d 03 Juni 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 35.000 35.000 0.200 - 0.200
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.47 - 0.47
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,486.750 55.00 1,541.750 25.014 0.925 25.939
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 40.250 40.250 0.035 - 0.035
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 8.000 8.000 0.008 - 0.008
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 25.06 0.93 25.98
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.470 - 0.470
3.757 - 3.757
25.057 0.925 25.982
- - -
- - -
- - -
29.364 0.925 30.289
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925
29.364 30.289
- 0.128 - 4.557
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 13 (Tiga Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
04 Juni 2018 s/d 10 Juni 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.00 1.00 0.07 - 0.07
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.00 1.00 0.01 - 0.01
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.08 - 0.08
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.00 450.00 0.27 - 0.27
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 35.00 25.00 60.00 0.20 0.14 0.34
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.47 0.14 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,541.75 165.75 1,707.50 25.939 2.789 28.728
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 40.25 40.25 0.035 - 0.035
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 8.000 2.00 10.00 0.008 0.002 0.010
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 25.98 2.79 28.77
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.08 - 0.081
0.47 0.14 0.613
3.76 0.09 3.848
25.98 2.79 28.773
- 1.69 1.685
- - -
- - -
30.29 4.71 35.00
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
MEI JUNI JULI AGUSTUS
`21-27 `28-03 `04-10 `11-17 `18-24 `25-01 `02-08 `09-15 `16-22 `23-29 `30-05 `06-12
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.11 Mg.12 Mg.13 Mg.14 Mg.15 Mg.16 Mg.17 Mg.18 Mg.19 Mg.20 Mg.21 Mg.22
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710
29.364 30.289 34.999
- 0.128 - 4.557 - 4.737
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 14 (Empat Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
11 Juni 2018 s/d 17 Juni 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,707.500 1,707.500 28.728 - 28.728
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 40.250 40.250 0.035 - 0.035
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 10.000 10.000 0.010 - 0.010
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 28.77 - 28.77
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
3.848 - 3.848
28.773 - 28.773
1.685 - 1.685
- - -
- - -
35.00 - 35.00
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 0.006
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 0.045
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 0.038
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2 3,507.15 0.295
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3 18,930.44 9.087
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3 3,006.87 1.391
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4,250.99 71.521
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5,717.43 4.954
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299
1 m' Pasangan Pipa Suling-suling m' 1,484.70 1.463
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005
6 1 bh Papan Operasi Bendung bh 1.00 0.037
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3 196.96 3.791
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr 193.02 0.178
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3 196.96 0.113
4 100 kg pembesian dengan besi polos atau ulir kg 9,848.00 3.884
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2 98.48 0.230
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2 45.30 0.187
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2 88.63 0.012
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh 2.00 0.278
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh 2.00 0.713
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set 3.00 0.010 0.000 0.000
2 Copy atau penggandaan buku/kontrak/laporan set 3.00 0.003 0.000 0.000
3 As Built Drawing set 3.00 0.001
100
Rencana Per minggu 0.081 0.084
Kumulatif Rencana 0.081 0.165
Kemajuan Realisasi Per Minggu 0.081 0.074
Kumulatif realisasi 0.081 0.154
Deviasi - 0.001 - 0.010
KURVA S MINGGU KE-14
0.147 0.147
1.514 1.514 1.514 1.514 1.514 1.514
0.464
0.150 0.150
0.122 0.122 0.122 0.122 0.122 0.122
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001 4.974 5.354 4.891 0.000 0.039 2.506 2.506
0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518 29.492 34.846 39.736 39.736 39.775 42.282 44.788
0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490 1.252 0.925 4.710 -
0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112 29.364 30.289 34.999 34.999
- 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594 - 0.128 - 4.557 - 4.737 - 4.737
JULI AGUSTUS SEPTEMBER
`09-15 `16-22 `23-29 `30-05 `06-12 `13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr
Mg.18 Mg.19 Mg.20 Mg.21 Mg.22 Mg.23 Mg.24 Mg.25 Mg.26
0.045 0.045
0.038 0.038
0.464 0.464
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 15 (Lima Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
18 Juni 2018 s/d 24 Juni 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,707.500 1,707.500 28.728 - 28.728
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 40.250 40.250 0.035 - 0.035
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 10.000 10.000 0.010 - 0.010
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 28.77 - 28.77
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG :
5 6 7
0.081 - 0.081
0.613 - 0.613
3.848 - 3.848
28.773 - 28.773
1.685 - 1.685
- - -
- - -
34.999 - 34.999
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
5
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - -
29.364 30.289 34.999 34.999 34.999
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 16 (Enam Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
25 Juni 2018 s/d 01 Juli 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,707.500 1,707.500 28.728 - 28.728
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 40.250 40.250 0.035 - 0.035
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - - - - -
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - - - - -
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 10.000 10.000 0.010 - 0.010
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 28.77 - 28.77
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
3.848 - 3.848
28.773 - 28.773
1.685 - 1.685
- - -
- - -
34.999 - 34.999
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
6
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - -
29.364 30.289 34.999 34.999 34.999 34.999
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 17 (Tujuh Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
02 Juli 2018 s/d 08 Juli 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,707.500 251.00 1,958.500 28.728 4.223 32.951
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 40.250 132.00 172.250 0.035 0.114 0.149
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 - 6.00 6.000 - 0.007 0.007
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 - 20.00 20.000 - 0.049 0.049
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 10.000 48.00 58.000 0.010 0.047 0.057
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 28.77 4.44 33.21
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
3.848 0.361 4.209
28.773 4.440 33.213
1.685 - 1.685
- - -
- - -
35.00 4.80 39.80
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
7
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - - 4.801
29.364 30.289 34.999 34.999 34.999 34.999 39.801
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282 - 4.988
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 18 (Delapan Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
09 Juli 2018 s/d 15 Juli 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 1,958.500 232.00 2,190.500 32.951 3.903 36.854
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 172.250 132.00 304.250 0.149 0.114 0.264
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 6.000 5.00 11.000 0.007 0.006 0.013
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 20.000 19.00 39.000 0.049 0.046 0.095
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 58.000 48.00 106.000 0.057 0.047 0.104
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 33.21 4.12 37.33
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
4.209 0.525 4.734
33.213 4.117 37.330
1.685 - 1.685
- - -
- - -
39.801 4.642 44.443
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
8
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - - 4.801 4.642
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282 - 4.988 - 2.852
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 19 (Sembilan Belas) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
16 Juli 2018 s/d 22 Juli 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 2,190.500 233.00 2,423.500 36.854 3.920 40.775
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 304.250 136.00 440.250 0.264 0.118 0.381
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 11.000 4.00 15.000 0.013 0.005 0.017
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 39.000 18.00 57.000 0.095 0.044 0.139
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 106.000 49.00 155.000 0.104 0.048 0.153
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 37.33 4.13 41.46
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
4.734 0.525 5.259
37.330 4.135 41.465
1.685 - 1.685
- - -
- - -
44.44 4.66 49.10
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
9
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - - 4.801 4.642 4.660
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282 - 4.988 - 2.852 - 0.782
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 20 (Dua Puluh) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
23 Juli 2018 s/d 29 Juli 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 2,423.500 229.00 2,652.500 40.775 3.853 44.627
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 440.250 132.00 572.250 0.381 0.114 0.496
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 15.000 4.00 19.000 0.017 0.005 0.022
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 57.000 19.00 76.000 0.139 0.046 0.185
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 155.000 47.00 202.000 0.153 0.046 0.199
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 41.46 4.06 45.53
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
5.259 0.530 5.789
41.465 4.064 45.529
1.685 - 1.685
- - -
- - -
49.103 4.595 53.697
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
0
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - - 4.801 4.642 4.660 4.595
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103 53.697
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282 - 4.988 - 2.852 - 0.782 0.316
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 21 (Dua Puluh Satu) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
30 Juli 2018 s/d 05 Agustus 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 2,652.500 232.00 2,884.500 44.627 3.903 48.531
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 572.250 131.00 703.250 0.496 0.114 0.609
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 19.000 4.00 23.000 0.022 0.005 0.027
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 76.000 19.00 95.000 0.185 0.046 0.232
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 202.000 48.00 250.000 0.199 0.047 0.246
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 45.53 4.12 49.64
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
5.789 0.526 6.316
45.529 4.115 49.645
1.685 1.541 3.226
- - -
- - -
53.697 6.183 59.880
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
1
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - - 4.801 4.642 4.660 4.595 6.183
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103 53.697 59.880
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282 - 4.988 - 2.852 - 0.782 0.316 3.002
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 22 (Dua Puluh Dua) Lokasi :: Desa Sukaresmi Kec. Kadupandak
Periode
06 Agustus 2018 s/d 12 Agustus 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
6.316 0.757 7.073
49.645 3.653 53.297
3.226 1.595 4.822
- 0.991 0.991
- - -
59.880 6.997 66.877
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
2
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - - 4.801 4.642 4.660 4.595 6.183 6.997
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103 53.697 59.880 66.877
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282 - 4.988 - 2.852 - 0.782 0.316 3.002 2.997
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas : : PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak : : 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak : : 14 Maret 2018
Minggu ke - 23 (Dua Puluh Tiga) Lokasi : : Desa Sukaresmi Kec. Kadupandak
Periode
13 Agustus 2018 s/d 19 Agustus 2018
KONTRAK VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4250.99 71.521 3,085.500 182.00 3,267.500 51.912 3.062 54.975
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 5717.43 4.954 806.250 806.250 0.699 - 0.699
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 697.14 0.804 34.231 23.00 57.231 0.039 0.027 0.066
4 1 m3 Pasangan Batu Kosong m3 122.65 0.299 122.650 122.650 0.299 - 0.299
1 m' Pasangan Pipa Suling-suling m' 1484.70 1.463 353.000 16.00 369.000 0.348 0.016 0.364
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 85.00 0.042 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.13 53.30 3.10 56.40
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 724,433,726 10.772
IV PEKERJAAN PASANGAN 5,321,632,233 79.132
V PEKERJAAN BETON BERTULANG 564,667,012 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN 975,450 0.015
J U M LAH 6,725,018,200.70 100.00
DIBULATKAN 6,725,018,000.000
P P N 10 % 672,501,800.00
T O T A L 7,397,519,800.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
7.073 0.386 7.458
53.297 3.104 56.402
4.822 - 4.822
0.991 - 0.991
- - -
66.877 3.490 70.367
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
196.96 3.791
193.02 0.178
196.96 0.113
9,848.00 3.884
98.48 0.230
45.30 0.187
88.63 0.012
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.700 1.515 1.515 1.515 6.405 6.471 5.001
Kumulatif Rencana 0.081 0.165 0.396 2.096 3.611 5.126 6.641 13.046 19.517 24.518
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.794 - 2.036 - 2.311 - 0.517 1.947 4.106 3.594
3
0.045 0.045
0.038 0.038 0.038
0.464
4.768 4.768 4.768 2.384 2.384 2.384 2.384 2.384 2.384 2.384
0.991 0.991 0.991
0.201
0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122
1.264
0.059
0.038
1.942
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
4.974 5.354 4.891 0.000 0.039 2.506 2.506 2.506 2.590 3.497 3.497 7.001
29.492 34.846 39.736 39.736 39.775 42.282 44.788 47.295 49.884 53.381 56.879 63.880
1.252 0.925 4.710 - - - 4.801 4.642 4.660 4.595 6.183 6.997
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103 53.697 59.880 66.877
- 0.128 - 4.557 - 4.737 - 4.737 - 4.776 - 7.282 - 4.988 - 2.852 - 0.782 0.316 3.002 2.997
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.464 0.464
0.122
0.005
0.037
0.007
0.042
1.264 1.264
0.059 0.059
0.038 0.038
1.942
0.230
0.187
0.012
0.278
0.713
Kegiatan : Pembangunan Jaringan Irigasi Bidang Sumber Daya Air Kabupaten Cianjur ( D
Pekerjaan : Daerah Irigasi Parung Bangkong
Lokasi : Desa Sukaresmi Kecamatan Kadupandak
Uraian Kegiatan : Pembuatan Bangunan Bendung 1 (satu) buah
Sumber Dana : DAK
Tahun Anggaran : 2018
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang
2 Papan Nama Proyek uk.0.60 x 0,80 m²
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja
Jumlah
Pajak PPN : 10 %
Jumlah Total
Dibulatkan
NTITAS HARGA ( DKH )
6,725,018,014.96
672,501,801.50
7,397,519,816.46
7,397,519,800.00
BOBOT %
0.07
0.01
0.27
0.34
77.20
0.72
0.19
0.63
0.57
0.00
0.04
0.01
0.02
2.96 100.8 196.9600
0.14 - 193.0208
0.06 - 196.9600
6.07 - 9,848.0000
0.76 98.4800
0.19 45.3008
0.05 88.6320
0.28
0.71
0.01
0.00
0.00
8,000,000,000.00 602,480,200.00
PEMERINTAH KABUPATEN CIANJUR
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG
Jl. Adi Sucipta No. 2 Telp/Fax (0263) 263198
C IAN J U R
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 24 (Dua Puluh Empat) Nomor Kontrak Addendum : 603/03/SDA/PUPR/2018
Periode Tanggal Kontrak : 24 Agustus 2018
20 Agustus 2018 s/d 26 Agustus 2018 Lokasi :: Desa Sukaresmi Kec. Kadupandak
KONTRAK ADD VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4588.62 77.202 3,267.500 829.00 4,096.500 54.975 13.948 68.922
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 830.13 0.719 806.250 23.00 829.250 0.699 0.020 0.719
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 161.73 0.186 57.231 51.00 108.231 0.066 0.059 0.125
4 1 m3 Pasangan Batu Kosong m3 256.46 0.625 152.000 49.00 201.000 0.371 0.120 0.490
1 m' Pasangan Pipa Suling-suling m' 573.60 0.565 369.000 102.00 471.000 0.364 0.100 0.464
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - - - - -
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - - - - -
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - - - - -
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 45.38 0.023 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.37 56.47 14.25 70.72
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 585,315,733 10.772
IV PEKERJAAN PASANGAN 5,337,610,442 79.132
V PEKERJAAN BETON BERTULANG 687,806,611 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN , 0.015
J U M LAH 6,724,042,564.96 100.00
DIBULATKAN 6,724,042,000.000
P P N 10 % 672,404,200.00
T O T A L 7,396,446,200.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
7.458 0.532 7.990
56.473 14.246 70.720
4.822 5.365 10.186
0.991 - 0.991
- - -
70.438 20.143 90.581
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
153.89 2.962
153.89 0.142
105.00 0.060
15,388.82 6.069
325.32 0.761
45.30 0.187
325.32 0.046
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.270 1.085 1.085 1.085 6.279 6.582 5.543
Kumulatif Rencana 0.081 0.165 0.396 1.666 2.751 3.835 4.920 11.199 17.781 23.324
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.364 - 1.175 - 1.020 1.204 3.795 5.841 4.788
4
0.045 0.045
0.038 0.038 0.038
0.635
5.147 5.147 5.147 2.573 2.573 2.573 2.573 2.573 2.573 2.573
0.144 0.144 0.144
0.047
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.987
0.047
0.020
3.034
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.277 5.829 5.194 0.000 0.039 2.621 2.621 2.621 2.704 2.765 2.765 6.901
28.602 34.431 39.625 39.625 39.664 42.285 44.906 47.527 50.231 52.996 55.761 62.661
1.252 0.925 4.710 - - - 4.801 4.642 4.660 4.595 6.183 6.997
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103 53.697 59.880 66.877
0.762 - 4.142 - 4.626 - 4.626 - 4.665 - 7.286 - 5.105 - 3.084 - 1.129 0.701 4.119 4.215
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.635 0.635
0.047
0.005
0.037
0.007
0.023
0.987 0.987
0.047 0.047
0.020 0.020
3.034
0.761
0.187
0.046
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 25 (Dua Puluh Lima) Nomor Kontrak Addendum : 603/03/SDA/PUPR/2018
Periode Tanggal Kontrak : 24 Agustus 2018
27 Agustus 2018 s/d 02 September 2018 Lokasi :: Desa Sukaresmi Kec. Kadupandak
KONTRAK ADD VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4588.62 77.202 4,096.500 492.12 4,588.620 68.922 8.280 77.202
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 830.13 0.719 829.250 0.88 830.125 0.719 0.001 0.719
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 161.73 0.186 108.231 53.49 161.725 0.125 0.062 0.186
4 1 m3 Pasangan Batu Kosong m3 256.46 0.625 201.000 55.46 256.463 0.490 0.135 0.625
1 m' Pasangan Pipa Suling-suling m' 573.60 0.565 471.000 102.60 573.600 0.464 0.101 0.565
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 - 5.00 5.000 - 0.005 0.005
6 1 bh Papan Operasi Bendung bh 1.00 0.037 - 1.00 1.000 - 0.037 0.037
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 - 1.00 1.000 - 0.007 0.007
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 45.38 0.023 - - - - -
SUB JUMLAH PEKERJAAN PASANGAN 79.37 70.72 8.63 79.35
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 585,315,733 10.772
IV PEKERJAAN PASANGAN 5,337,610,442 79.132
V PEKERJAAN BETON BERTULANG 687,806,611 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN , 0.015
J U M LAH 6,724,042,564.96 100.00
DIBULATKAN 6,724,042,000.000
P P N 10 % 672,404,200.00
T O T A L 7,396,446,200.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
7.990 0.199 8.189
70.720 8.627 79.347
10.186 0.041 10.228
0.991 - 0.991
- - -
90.58 8.87 99.45
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
153.89 2.962
153.89 0.142
105.00 0.060
15,388.82 6.069
325.32 0.761
45.30 0.187
325.32 0.046
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.270 1.085 1.085 1.085 6.279 6.582 5.543
Kumulatif Rencana 0.081 0.165 0.396 1.666 2.751 3.835 4.920 11.199 17.781 23.324
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.364 - 1.175 - 1.020 1.204 3.795 5.841 4.788
5
0.045 0.045
0.038 0.038 0.038
0.635
5.147 5.147 5.147 2.573 2.573 2.573 2.573 2.573 2.573 2.573
0.144 0.144 0.144
0.047
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.987
0.047
0.020
3.034
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.277 5.829 5.194 0.000 0.039 2.621 2.621 2.621 2.704 2.765 2.765 6.901
28.602 34.431 39.625 39.625 39.664 42.285 44.906 47.527 50.231 52.996 55.761 62.661
1.252 0.925 4.710 - - - 4.801 4.642 4.660 4.595 6.183 6.997
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103 53.697 59.880 66.877
0.762 - 4.142 - 4.626 - 4.626 - 4.665 - 7.286 - 5.105 - 3.084 - 1.129 0.701 4.119 4.215
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.635 0.635
0.047
0.005
0.037
0.007
0.023
0.987 0.987
0.047 0.047
0.020 0.020
3.034
0.761
0.187
0.046
0.278
0.713
RINCIAN LAPORAN KEMAJUAN PROGRESS PEKERJAAN Kontraktor Pelaksana : PT. BUDI UTAMA AGUNG
KEGIATAN REHABILITASI/PENINGKATAN/PEMBANGUNAN JARINGAN IRIGASI (DAK) Konsultan Pengawas :: PT. TATA BUMI KONSULTAN
Pekerjaan PENINGKATAN DI PARUNGBANGKONG Nomor Kontrak :: 602/34/SDA/PUPR/2018
Tahun Anggaran 2018 Tanggal Kontrak :: 14 Maret 2018
Minggu ke - 26 (Dua Puluh Enam) Nomor Kontrak Addendum : 603/03/SDA/PUPR/2018
Periode Tanggal Kontrak : 24 Agustus 2018
### s/d 09 September 2018 Lokasi :: Desa Sukaresmi Kec. Kadupandak
KONTRAK ADD VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
1 2 4 3 7 8 9 10 11 12 13
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls 1.00 0.074 1.000 1.000 0.074 - 0.074
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh 1.00 0.006 1.000 1.000 0.006 - 0.006
SUB JUMLAH PEKERJAAN PERSIAPAN 0.08 0.081 - 0.081
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh 450.00 0.269 450.000 450.000 0.269 - 0.269
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari 60.00 0.343 60.000 60.000 0.343 - 0.343
SUB JUMLAH PEKERJAAN DEWATERING 0.61 0.61 - 0.61
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3 4588.62 77.202 4,588.620 4,588.620 77.202 - 77.202
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2 830.13 0.719 830.125 830.125 0.719 - 0.719
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2 161.73 0.186 161.725 161.725 0.186 - 0.186
4 1 m3 Pasangan Batu Kosong m3 256.46 0.625 256.463 256.463 0.625 - 0.625
1 m' Pasangan Pipa Suling-suling m' 573.60 0.565 573.600 573.600 0.565 - 0.565
5 1 m' Peilskaal/Mistar duga muka air m' 5.00 0.005 5.000 5.000 0.005 - 0.005
6 1 bh Papan Operasi Bendung bh 1.00 0.037 1.000 1.000 0.037 - 0.037
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh 1.00 0.007 1.000 1.000 0.007 - 0.007
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2 45.38 0.023 - 45.38 45.380 - 0.023 0.023
SUB JUMLAH PEKERJAAN PASANGAN 79.37 79.35 0.02 79.37
1 2 3 4
A Pembuatan Bangunan Bendung 1 (satu) buah
I PEKERJAAN PERSIAPAN 5,429,220 0.081
II PEKERJAAN DEWATERING 41,204,100 0.613
III PEKERJAAN TANAH 585,315,733 10.772
IV PEKERJAAN PASANGAN 5,337,610,442 79.132
V PEKERJAAN BETON BERTULANG 687,806,611 8.397
VI PEKERJAAN PINTU AIR 66,676,460 0.991
VII PEKERJAAN LAIN-LAIN , 0.015
J U M LAH 6,724,042,564.96 100.00
DIBULATKAN 6,724,042,000.000
P P N 10 % 672,404,200.00
T O T A L 7,396,446,200.00
KONTRAK ADD
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Mengetahui : Diperiksa :
Pejabat Pembuat Komitmen Pelaksana Teknis Kegiatan Konsultan Pengawas
DINAS PEKERJAAN UMUM DAN PENATAAN RUANG DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PT. TATA BUMI KONSULTAN
5 6 7
0.081 - 0.081
0.613 - 0.613
8.189 0.514 8.704
79.347 0.023 79.369
10.228 - 10.228
0.991 - 0.991
- 0.015 0.015
99.449 0.551 100.000
PROGRES PEKERJAAN (%)
5 6 7
I PEKERJAAN PERSIAPAN
1 Sewa direksi Keet,los kerja dan gudang ls
2 Papan Nama Proyek uk.0.60 x 0,80 m² bh
II PEKERJAAN DEWATERING
1 1 bh Kistdam pasir/tanah dibungkus karung plastik bagor ukuran 43 x 65 cm bh
2 Pengoperasian pompa air desel daya 5 kw 1hari per 8 jam kerja hari
III PEKERJAAN TANAH
1 Pembersihan lapangan dan striping/korsekan m2
2 1 m³ Menggali dengan Excavator dan material atau hasil galian m3
3 1 m³ Timbunan tanah atau urugan tanah kembali termasuk perataan dan perapihan m3
IV PEKERJAAN PASANGAN
1 1 m³ Mortar tipe N (mutu PP tertentu setara dengan campuran 1 PC : 4 PP) m3
2 1 m² Siaran dengan mortar jenis PC-PP tipe M (mutu PP tertentu setara dengan camp.1 PC : 2 PP) m2
3 1 m² Plesteran tebal 1,5 cm, dengan mortar jenis PC-PP tipe S (mutu PP tertentu setara dengan camp. 1 PC:3 PP) m2
4 1 m3 Pasangan Batu Kosong m3
1 m' Pasangan Pipa Suling-suling m'
5 1 m' Peilskaal/Mistar duga muka air m'
6 1 bh Papan Operasi Bendung bh
7 1 bh Nomenklatur Bendung uk. 0,40 x 0,60 m bh
8 1 m² pengecetan tembok baru ( satu lapis plamuur , 1 lapis cat dasar, 2 lapis cat penutup ) m2
V PEKERJAAN BETON BERTULANG
1 1 m³ beton mutu, f’c = 14,5 MPa (K175), slump (12±2) cm, w/c = 0,66 ( Manual ) m3
2 1 m³ beton tambahan biaya menggunakan bahan aditif ltr
3 1 m³ beton dicorkan pada tapak berjarak < 25 m atau dengan ketinggian/kedalaman < 1 m ( Manual) m3
4 100 kg pembesian dengan besi polos atau ulir kg
5 1 m² bekisting untuk lantai permukaan beton biasa dengan multiflex 12 mm atau 18 mm (tanpa perancah) m2
6 1 m² perancah bekisting kaso 5/7 cm tinggi 4 m* m2
7 1 m² bongkar bekisting secara hati-hati (dan membereskan puing) * m2
VI PEKERJAAN PINTU AIR
1 Pintu Sorong Baja dengan roda gigi stang tunggal b = 0,50 m' h = 0,60 m' bh
2 Pintu Sorong Baja dengan roda gigi stang double b = 1,20 m' h = 1,80 m' bh
VII PEKERJAAN LAIN-LAIN
1 Dokumentasi set
2 Copy atau penggandaan buku/kontrak/laporan set
3 As Built Drawing set
153.89 2.962
153.89 0.142
105.00 0.060
15,388.82 6.069
325.32 0.761
45.30 0.187
325.32 0.046
2.00 0.278
2.00 0.713
3.00 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.003 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
3.00 0.001
100
Rencana Per minggu 0.081 0.084 0.231 1.270 1.085 1.085 1.085 6.279 6.582 5.543
Kumulatif Rencana 0.081 0.165 0.396 1.666 2.751 3.835 4.920 11.199 17.781 23.324
Kemajuan Realisasi Per Minggu 0.081 0.074 0.074 0.074 1.274 1.240 3.309 8.869 8.629 4.490
Kumulatif realisasi 0.081 0.154 0.228 0.302 1.575 2.815 6.125 14.993 23.623 28.112
Deviasi - 0.001 - 0.010 - 0.168 - 1.364 - 1.175 - 1.020 1.204 3.795 5.841 4.788
6
0.045 0.045
0.038 0.038 0.038
0.635
5.147 5.147 5.147 2.573 2.573 2.573 2.573 2.573 2.573 2.573
0.144 0.144 0.144
0.047
0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047 0.047
0.987
0.047
0.020
3.034
-
-
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
5.277 5.829 5.194 0.000 0.039 2.621 2.621 2.621 2.704 2.765 2.765 6.901
28.602 34.431 39.625 39.625 39.664 42.285 44.906 47.527 50.231 52.996 55.761 62.661
1.252 0.925 4.710 - - - 4.801 4.642 4.660 4.595 6.183 6.997
29.364 30.289 34.999 34.999 34.999 34.999 39.801 44.443 49.103 53.697 59.880 66.877
0.762 - 4.142 - 4.626 - 4.626 - 4.665 - 7.286 - 5.105 - 3.084 - 1.129 0.701 4.119 4.215
AGUSTUS SEPTEMBER
`13-19 `20-26 `27-02 `03-09
Prestasi % Ket
7 hr 7 hr 7 hr 7 hr
Mg.23 Mg.24 Mg.25 Mg.26
0.045
0.038
0.635 0.635
0.047
0.005
0.037
0.007
0.023
0.987 0.987
0.047 0.047
0.020 0.020
3.034
0.761
0.187
0.046
0.278
0.713
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.350
4 Listrik dan Air Kerja Ls 1.000 0.148 0.350
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.300
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 304.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 469.785
3 Pek. Acian m2 608.988 1.287 343.988
4 Pek. Acian Kolom m2 92.160 0.174 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 39.980
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 -
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 -
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 (1.000)
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 -
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 -
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 -
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 -
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 -
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 -
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 -
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 -
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 152.987
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 152.987
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 -
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 -
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 -
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 -
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 -
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 -
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 -
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 -
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 -
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 -
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 -
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 -
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 -
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 -
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 -
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 -
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 -
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 -
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 -
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
15 Pek. Instalasi CCTV titk 6.000 0.045 -
16 Pek. Instalasi Telepon titik 4.000 0.035 -
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 -
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 -
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 -
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 -
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 -
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 -
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 -
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 -
13 Pek. B3 (Balok) m3 3.200 0.710 -
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 -
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 -
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 -
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 -
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016
8 Pek. Pas. Railling Tangga m' 12.480 0.154
9 Pek. Pas. Railling Tangga m' 12.480 0.124
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827
7 Pek. Floor Hardener m2 230.200 0.855
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111
11 Pek. Pemasangan waterproofing m2 15.000 0.042
Sub Jumlah Pekerjaan Lantai 6.908
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176
3 Pek. Pasang Nok Metalroof m' 39.000 0.151
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040
9 Pek Talang Datar m2 9.000 0.038
Sub Jumlah Pekerjaan Atap dan Plafond 6.850
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199
Sub Jumlah Pekerjaan Sanitair 0.709
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012
7 Pek. SDP AC bh 1.000 0.012
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089
9 Pek. Pilot Lamp buah 3.000 0.002
10 Pek. Fuse Pilot Lamp buah 3.000 0.001
11 Pek. Selector Switch buah 1.000 0.008
12 Pek. Amper Meter buah 3.000 0.029
13 Pek. Volt Meter buah 1.000 0.010
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025
Sub Jumlah Pekerjaan Mekanikal 0.286
c. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
- 6.780 - 6.780
-
-
72.000 376.759 2.667 0.630 3.297
99.963 569.748 1.558 0.331 1.889
100.000 443.988 0.727 0.211 0.938
- - - -
- - - -
20.000 59.980 0.351 0.175 0.526
- 5.302 1.348 6.651
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
(1.000) (0.084) - (0.084)
- - - -
- - - -
- - - -
- - - -
- - - -
- (0.084) - (0.084)
-
16.945 16.945 - 0.075 0.075
86.500 86.500 - 1.177 1.177
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 1.252 1.252
-
160.890 0.987 - 0.987
9.330 0.036 - 0.036
14.670 0.041 - 0.041
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
152.987 305.973 0.411 0.411 0.822
152.987 305.973 0.569 0.569 1.139
9.000 0.038 - 0.038
- - - -
- 2.083 0.980 3.063
-
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
4.000 4.000 - 0.024 0.024
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - 0.024 0.024
-
-
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
- 2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
12.000 1.906 - 1.906
- - - -
4.000 0.657 - 0.657
11.520 2.167 - 2.167
6.340 6.340 - 1.698 1.698
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
5.660 5.660 - 1.564 1.564
210.000 2.695 - 2.695
- - - -
- - - -
- - - -
- 7.424 3.262 10.686
-
-
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Bandung, 22-Aug-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 98.000
Sisa Waktu Pelaksanaan : 112.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
6.780 - 6.780
-
-
-
5.302 1.348 6.651
PROGRES PEKERJAAN (%)
5 6 7
(0.084) - (0.084)
- 1.252 1.252
2.083 0.980 3.063
- - -
-
-
- - -
- - -
- 0.024 0.024
-
-
-
2.615 - 2.615
7.424 3.262 10.686
-
-
- - -
- - -
- - -
- - -
- - -
PROGRES PEKERJAAN (%)
5 6 7
-
-
- - -
- - -
- - -
-
-
- - -
5 6 7
Bandung, 22-Aug-2016
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 14 ( Empat Belas )
Periode
16-Aug-2016 s/d 22-Aug-2016
BOBOT REALISASI
#REF! #REF! #REF! #REF!
KOMULATIF BOBOT REALISASI
#REF! #REF! #REF! #REF! #REF! #REF!
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
F
0.890 0.890 0.890
42.672
3.585 3.585 3.585 3.585 3.585 3.585
I 34.806
31.561
T 27.910
T 27.910
R
20.401
I
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652
Diperiksa Diperiksa
Konsultan Pengawasan Berkala Konsultan Pengawa
PT. TRIBUANA REKAYASA PT. PURI DIME
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.400
4 Listrik dan Air Kerja Ls 1.000 0.148 0.400
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.350
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 569.748
3 Pek. Acian m2 608.988 1.287 443.988
4 Pek. Acian Kolom m2 92.160 0.174 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 59.980
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 -
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 -
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 (1.000)
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 -
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 -
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 -
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 -
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 86.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 -
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 -
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 -
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 -
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 -
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 -
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 -
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 -
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 -
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 -
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 -
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 -
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 -
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 -
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 4.000
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 -
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 -
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 -
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 -
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 -
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 -
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
15 Pek. Instalasi CCTV titk 6.000 0.045 -
16 Pek. Instalasi Telepon titik 4.000 0.035 -
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 -
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 -
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 -
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 -
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 -
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 -
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 -
13 Pek. B3 (Balok) m3 3.200 0.710 -
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 5.660
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 -
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 -
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 -
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154
9 Pek. Pas. Railling Tangga m' 12.480 0.124
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827
7 Pek. Floor Hardener m2 230.200 0.855
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111
11 Pek. Pemasangan waterproofing m2 15.000 0.042
Sub Jumlah Pekerjaan Lantai 6.908
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176
3 Pek. Pasang Nok Metalroof m' 39.000 0.151
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040
9 Pek Talang Datar m2 9.000 0.038
Sub Jumlah Pekerjaan Atap dan Plafond 6.850
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199
Sub Jumlah Pekerjaan Sanitair 0.709
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012
7 Pek. SDP AC bh 1.000 0.012
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089
9 Pek. Pilot Lamp buah 3.000 0.002
10 Pek. Fuse Pilot Lamp buah 3.000 0.001
11 Pek. Selector Switch buah 1.000 0.008
12 Pek. Amper Meter buah 3.000 0.029
13 Pek. Volt Meter buah 1.000 0.010
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025
Sub Jumlah Pekerjaan Mekanikal 0.286
c. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
- 6.780 - 6.780
-
-
376.759 3.297 - 3.297
183.770 753.518 1.889 0.609 2.499
165.000 608.988 0.938 0.349 1.287
92.160 92.160 - 0.174 0.174
- - - -
50.000 109.980 0.526 0.439 0.965
- 6.651 1.570 8.221
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
(1.000) (0.084) - (0.084)
- - - -
- - - -
- - - -
- - - -
- - - -
- (0.084) - (0.084)
-
16.945 0.075 - 0.075
75.000 161.500 1.177 1.021 2.198
24.000 24.000 - 0.197 0.197
- - - -
- - - -
- - - -
- - - -
- - - -
- 1.252 1.218 2.470
-
160.890 0.987 - 0.987
9.330 0.036 - 0.036
14.670 0.041 - 0.041
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
- 3.063 - 3.063
-
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
20.000 24.000 0.024 0.120 0.144
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 0.024 0.120 0.144
-
-
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
- 2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
12.000 1.906 - 1.906
- - - -
4.000 0.657 - 0.657
11.520 2.167 - 2.167
- 6.340 1.698 - 1.698
- - - -
- - - -
- - - -
- - - -
8.112 8.112 - 1.909 1.909
1.920 1.920 - 0.426 0.426
10.000 15.660 1.564 2.763 4.328
210.000 2.695 - 2.695
- - - -
- - - -
- - - -
- 10.686 5.098 15.784
-
-
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Bandung, 29-Aug-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 105.000
Sisa Waktu Pelaksanaan : 105.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
6.780 - 6.780
-
-
-
6.651 1.570 8.221
PROGRES PEKERJAAN (%)
5 6 7
(0.084) - (0.084)
1.252 1.218 2.470
3.063 - 3.063
- - -
-
-
- - -
- - -
0.024 0.120 0.144
-
-
-
2.615 - 2.615
10.686 5.098 15.784
-
-
- - -
- - -
- - -
- - -
- - -
PROGRES PEKERJAAN (%)
5 6 7
-
-
- - -
- - -
- - -
-
-
- - -
5 6 7
Bandung, 29-Aug-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
F
0.890 0.890 0.890
42.672
3.585 3.585 3.585 3.585 3.585 3.585
I 34.806
39.582
T 27.910
R 31.561
R 31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 8.021
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776
Diperiksa Diperiksa
Konsultan Pengawasan Berkala Konsultan Pengawa
PT. TRIBUANA REKAYASA PT. PURI DIME
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.450
4 Listrik dan Air Kerja Ls 1.000 0.148 0.450
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.350
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 109.980
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 -
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 -
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 (1.000)
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 -
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 -
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 -
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 -
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 161.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 24.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 -
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 -
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 -
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 -
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 -
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 -
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 -
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 -
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 -
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 -
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 -
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 -
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 -
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 24.000
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 -
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 -
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 -
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 -
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 -
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 -
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
15 Pek. Instalasi CCTV titk 6.000 0.045 -
16 Pek. Instalasi Telepon titik 4.000 0.035 -
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 -
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 -
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 -
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 -
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 -
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 -
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 8.112
13 Pek. B3 (Balok) m3 3.200 0.710 1.920
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 15.660
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 -
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 -
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 -
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016
8 Pek. Pas. Railling Tangga m' 12.480 0.154
9 Pek. Pas. Railling Tangga m' 12.480 0.124
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827
7 Pek. Floor Hardener m2 230.200 0.855
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111
11 Pek. Pemasangan waterproofing m2 15.000 0.042
Sub Jumlah Pekerjaan Lantai 6.908
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176
3 Pek. Pasang Nok Metalroof m' 39.000 0.151
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040
9 Pek Talang Datar m2 9.000 0.038
Sub Jumlah Pekerjaan Atap dan Plafond 6.850
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199
Sub Jumlah Pekerjaan Sanitair 0.709
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012
7 Pek. SDP AC bh 1.000 0.012
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089
9 Pek. Pilot Lamp buah 3.000 0.002
10 Pek. Fuse Pilot Lamp buah 3.000 0.001
11 Pek. Selector Switch buah 1.000 0.008
12 Pek. Amper Meter buah 3.000 0.029
13 Pek. Volt Meter buah 1.000 0.010
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025
Sub Jumlah Pekerjaan Mekanikal 0.286
c. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
- 6.780 - 6.780
-
-
376.759 3.297 - 3.297
753.518 2.499 - 2.499
608.988 1.287 - 1.287
92.160 0.174 - 0.174
- - - -
109.980 0.965 - 0.965
- 8.221 - 8.221
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
(1.000) (0.084) - (0.084)
- - - -
- - - -
- - - -
- - - -
- - - -
- (0.084) - (0.084)
-
16.945 0.075 - 0.075
75.000 236.500 2.198 1.021 3.219
24.000 0.197 - 0.197
- - - -
- - - -
- - - -
- - - -
- - - -
- 2.470 1.021 3.491
-
160.890 0.987 - 0.987
9.330 0.036 - 0.036
14.670 0.041 - 0.041
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
- 3.063 - 3.063
-
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2.000 2.000 - 0.148 0.148
26.600 26.600 - 0.027 0.027
70.000 70.000 - 0.081 0.081
- - - - -
- - - - -
15.000 15.000 - 0.038 0.038
28.000 28.000 - 0.109 0.109
- - - -
- - 0.404 0.404
-
- - - -
- - - -
- - - -
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
20.000 44.000 0.144 0.120 0.265
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- 0.144 0.120 0.265
-
-
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
- 2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
12.000 1.906 - 1.906
2.000 2.000 - 0.130 0.130
4.000 0.657 - 0.657
11.520 2.167 - 2.167
6.340 1.698 - 1.698
- - - -
- - - -
- - - -
- - - -
5.408 13.520 1.909 1.272 3.181
1.280 3.200 0.426 0.284 0.710
10.440 26.100 4.328 2.885 7.213
210.000 2.695 - 2.695
- - - -
- - - -
- - - -
- 15.784 4.571 20.355
-
-
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Bandung, 5-Sep-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 112.000
Sisa Waktu Pelaksanaan : 98.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
6.780 - 6.780
-
-
-
8.221 - 8.221
PROGRES PEKERJAAN (%)
5 6 7
(0.084) - (0.084)
2.470 1.021 3.491
3.063 - 3.063
- - -
-
-
- 0.404 0.404
- - -
0.144 0.120 0.265
-
-
-
2.615 - 2.615
15.784 4.571 20.355
-
-
- - -
- - -
- - -
- - -
- - -
PROGRES PEKERJAAN (%)
5 6 7
-
-
- - -
- - -
- - -
-
-
- - -
5 6 7
Bandung, 5-Sep-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
42.672
F
0.890 0.890 0.890
3.585 3.585 3.585 3.585 45.724
3.585 3.585
I 34.806
39.582
T 27.910
R 20.401
31.561
R 20.401
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052
Diperiksa Diperiksa
Konsultan Pengawasan Berkala Konsultan Pengawa
PT. TRIBUANA REKAYASA PT. PURI DIME
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
0.03
78.479 ###
0.79 73.886
0.79 ###
0.26 70.842
0.26 ###
0.63 0.63 ###
64.625 0.57 0.57 ###
###
59.444
0.94 0.94 ###
0.51 ###
1.752 0.40 0.35
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.500
4 Listrik dan Air Kerja Ls 1.000 0.148 0.500
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.400
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 109.980
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 -
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 -
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 (1.000)
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 -
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 -
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 -
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 -
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 236.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 24.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 -
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 -
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 -
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 -
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 -
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 -
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 -
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 -
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 -
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 -
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 -
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 -
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 -
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 -
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
15 Pek. Instalasi CCTV titk 6.000 0.045 -
16 Pek. Instalasi Telepon titik 4.000 0.035 -
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 -
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 -
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 -
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 -
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 -
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 -
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 -
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 -
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016
8 Pek. Pas. Railling Tangga m' 12.480 0.154
9 Pek. Pas. Railling Tangga m' 12.480 0.124
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827
7 Pek. Floor Hardener m2 230.200 0.855
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111
11 Pek. Pemasangan waterproofing m2 15.000 0.042
Sub Jumlah Pekerjaan Lantai 6.908
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176
3 Pek. Pasang Nok Metalroof m' 39.000 0.151
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040
9 Pek Talang Datar m2 9.000 0.038
Sub Jumlah Pekerjaan Atap dan Plafond 6.850
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199
Sub Jumlah Pekerjaan Sanitair 0.709
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012
7 Pek. SDP AC bh 1.000 0.012
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089
9 Pek. Pilot Lamp buah 3.000 0.002
10 Pek. Fuse Pilot Lamp buah 3.000 0.001
11 Pek. Selector Switch buah 1.000 0.008
12 Pek. Amper Meter buah 3.000 0.029
13 Pek. Volt Meter buah 1.000 0.010
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025
Sub Jumlah Pekerjaan Mekanikal 0.286
c. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
- 6.780 - 6.780
-
-
376.759 3.297 - 3.297
753.518 2.499 - 2.499
608.988 1.287 - 1.287
92.160 0.174 - 0.174
- - - -
34.800 144.780 0.965 0.305 1.270
- 8.221 0.305 8.526
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
3.000 2.000 (0.084) 0.252 0.168
10.000 10.000 - 0.742 0.742
- - - -
- - - -
- - - -
- - - -
- (0.084) 0.995 0.911
-
16.945 0.075 - 0.075
38.000 274.500 3.219 0.517 3.736
24.000 0.197 - 0.197
- - - -
- - - -
- - - -
- - - -
- - - -
- 3.491 0.517 4.008
-
160.890 0.987 - 0.987
9.330 0.036 - 0.036
14.670 0.041 - 0.041
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
- 3.063 - 3.063
-
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
1.000 1.000 - 0.163 0.163
1.000 1.000 - 0.039 0.039
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
2.000 0.148 - 0.148
26.600 0.027 - 0.027
70.000 0.081 - 0.081
28.500 28.500 - 0.193 0.193
- - - -
15.000 0.038 - 0.038
28.000 0.109 - 0.109
- - - -
- 0.404 0.396 0.799
-
3.000 3.000 - 0.067 0.067
- - - -
1.000 1.000 - 0.020 0.020
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - 0.087 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
1.000 1.000 - 0.025 0.025
- - - -
- - - -
- - - -
44.000 0.265 - 0.265
- - - -
8.000 8.000 - 0.155 0.155
- - - -
- - - -
13.000 13.000 - 0.013 0.013
5.000 5.000 - 0.006 0.006
18.000 18.000 - 0.163 0.163
4.000 4.000 - 0.030 0.030
4.000 4.000 - 0.038 0.038
3.000 3.000 - 0.022 0.022
2.000 2.000 - 0.017 0.017
40.000 40.000 - 0.085 0.085
40.000 40.000 - 0.085 0.085
- - - -
- - - -
- 0.265 0.638 0.902
-
-
-
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
- 2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
12.000 1.906 - 1.906
2.000 0.130 - 0.130
4.000 0.657 - 0.657
11.520 2.167 - 2.167
6.340 1.698 - 1.698
- - - -
- - - -
- - - -
- - - -
13.520 3.181 - 3.181
3.200 0.710 - 0.710
26.100 7.213 - 7.213
210.000 2.695 - 2.695
- - - -
- - - -
- - - -
- 20.355 - 20.355
-
-
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
-
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Bandung, 12-Sep-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 119.000
Sisa Waktu Pelaksanaan : 91.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
6.780 - 6.780
-
-
-
8.221 0.305 8.526
PROGRES PEKERJAAN (%)
5 6 7
(0.084) 0.995 0.911
3.491 0.517 4.008
3.063 - 3.063
- - -
-
-
0.404 0.396 0.799
- 0.087 0.087
0.265 0.638 0.902
-
-
-
2.615 - 2.615
20.355 - 20.355
-
-
- - -
- - -
- - -
- - -
- - -
PROGRES PEKERJAAN (%)
5 6 7
-
-
- - -
- - -
- - -
-
-
- - -
5 6 7
Bandung, 12-Sep-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
(BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16 13/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16 19/09/16
JUNI JULI AGUSTUS SEPTEMB
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119 120-126
5 6 7 8 9 10 11 12 13 14 15 16 17 18
L
I 0.100 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
47.173
48.687
F
0.890 0.890 0.890
42.672
3.585 3.585 3.585 3.585 45.724
3.585 3.585
I 34.806
39.582
T 27.910
R 31.561
R 31.561
20.401
I
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
4
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501 4.579
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173 51.752
0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiksa
Konsultan Pengawasan Berkala Konsultan Pengawa
PT. TRIBUANA REKAYASA PT. PURI DIME
20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
BER OKTOBER NOVEMBER DES SKALA
127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
19 20 21 22 23 24 25 26 27 28 29 30
3.585 3.585
7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400 ###
59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00 ###
###
###
###
###
###
###
###
AH Ir. YUNAGRADELAS ###
Direktur ###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.550
4 Listrik dan Air Kerja Ls 1.000 0.148 0.550
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.450
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898
II. PEKERJAAN KONSTRUKSI
A. BAGIAN KONTRAK I BANGUNAN BELAKANG
PEKERJAAN STRUKTUR
b. Pekerjaan Struktur
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 2.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 10.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027
9 Pek. Pas. Railling Tangga m' 11.050 0.109
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 24.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329
8 Pek. Pemasangan waterproofing m2 22.000 0.062
Sub Jumlah Pekerjaan Lantai 6.066
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101
Sub Jumlah Pekerjaan Atap dan Plafond 3.572
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 1.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126
Sub Jumlah Pekerjaan Sanitair 3.057
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061
- Heat Detector Unit 2.000 0.007
- Bel Alarm Unit 1.000 0.007
- Break Glass Unit 1.000 0.006
- Hambatan Tepi Unit 2.000 0.005
- CTBFA Unit 1.000 0.171
6 Pek. Instalasi CCTV -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445
7 Pek. Pasang Alarm Unit 1.000 0.074
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079
9 Pek. Test Comisioning Unit 1.000 0.012
Sub Jumlah Pekerjaan Mekanikal 1.030
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 2x36 cm Set 3.000 0.047
7 Pek. Pemasangan lampu RMI 3x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005
Sub Jumlah Pekerjaan Elektrikal 1.277
B. BAGIAN KONTRAK II BANGUNAN DEPAN
PEKERJAAN STRUKTUR
a. Pekerjaan Galian dan Urugan
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630
Sub Jumlah Pekerjaan Struktur 28.684
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297
3 Pek. Acian m2 994.210 2.101
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341
5 Pek. Acian Listplang Beton m2 15.000 0.028
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338
Sub Jumlah Pekerjaan Dinding 10.456
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016
8 Pek. Pas. Railling Tangga m' 12.480 0.154
9 Pek. Pas. Railling Tangga m' 12.480 0.124
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827
7 Pek. Floor Hardener m2 230.200 0.855
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111
11 Pek. Pemasangan waterproofing m2 15.000 0.042
Sub Jumlah Pekerjaan Lantai 6.908
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176
3 Pek. Pasang Nok Metalroof m' 39.000 0.151
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040
9 Pek Talang Datar m2 9.000 0.038
Sub Jumlah Pekerjaan Atap dan Plafond 6.850
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199
Sub Jumlah Pekerjaan Sanitair 0.709
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012
7 Pek. SDP AC bh 1.000 0.012
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089
9 Pek. Pilot Lamp buah 3.000 0.002
10 Pek. Fuse Pilot Lamp buah 3.000 0.001
11 Pek. Selector Switch buah 1.000 0.008
12 Pek. Amper Meter buah 3.000 0.029
13 Pek. Volt Meter buah 1.000 0.010
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025
Sub Jumlah Pekerjaan Mekanikal 0.286
c. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
- - - -
- - - -
- - - -
6.000 8.000 0.168 0.505 0.673
10.000 0.742 - 0.742
1.000 1.000 - 0.049 0.049
3.000 3.000 - 0.042 0.042
2.000 2.000 - 0.027 0.027
- - - -
0.911 0.623 1.534
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
3.063 - 3.063
- - - -
- - - -
350.000 350.000 - 0.326 0.326
- - - -
- 0.326 0.326
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.087 - 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
12.000 1.906 - 1.906
2.000 0.130 - 0.130
4.000 0.657 - 0.657
11.520 2.167 - 2.167
6.340 1.698 - 1.698
4.600 4.600 - 1.330 1.330
1.890 1.890 - 0.437 0.437
- - - -
- - - -
13.520 3.181 - 3.181
3.200 0.710 - 0.710
26.100 7.213 - 7.213
210.000 2.695 - 2.695
- - - -
- - - -
- - - -
20.355 1.768 22.123
9 10 11 12 13
- - - -
- - - -
- - - -
- 2.175 2.175
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Bandung, 19-Sep-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 126.000
Sisa Waktu Pelaksanaan : 84.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
6.780 - 6.780
-
-
-
8.526 - 8.526
PROGRES PEKERJAAN (%)
5 6 7
0.911 0.623 1.534
4.008 1.274 5.282
3.063 - 3.063
- 0.326 0.326
-
-
0.799 0.455 1.254
0.087 - 0.087
0.902 0.126 1.028
-
-
-
2.615 - 2.615
20.355 1.768 22.123
-
-
- 2.175 2.175
- - -
- - -
- - -
- - -
PROGRES PEKERJAAN (%)
5 6 7
-
-
- - -
- - -
- - -
-
-
- - -
5 6 7
Bandung, 19-Sep-2016
0.732 1.364
0.000 0.100 0.200
BOBOT RENCANA 100.00
0.100 0.100 0.532 0.632
KOMULATIF BOBOT
#REF! 0.000 0.100 0.200 0.732 1.364
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
RAT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEP
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.173
48
F
0.890 0.890 0.890
42.672
3.585 3.585 3.585 3.58545.724
3.585
I 34.806
39.582
T 27.910
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
1.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperik
Konsultan Pengawasan Berkala Konsultan Pe
PT. TRIBUANA REKAYASA PT. PUR
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
0.03 78.479
0.79 0.79 0.79
73.886
0.26 0.26
70.842
0.63 0.63
0.57 0.57
64.625
59.444 0.94
0.94
0.51
0.10 55.447
0.40 0.35
51.752
47.173
48.687
724 3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 4.593 4.593 4.729 2.915 4.214 2.371 1.300 1.400
51.752 59.444 64.625 70.842 73.886 78.479 83.071 87.800 90.715 94.929 97.300 98.600 100.00
6.759
55.447
3.695
Band 19-Sep-2016
98.600
97.300
94.929
90.715
90.715
87.800
83.071
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.550
4 Listrik dan Air Kerja Ls 1.000 0.148 0.550
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.500
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 -
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 -
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 8.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 10.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 24.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 1.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 -
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 -
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 1.890
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 -
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 -
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 248.555
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 -
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 -
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 -
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 -
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 -
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
3.063 - 3.063
- - - -
- - - -
350.000 0.326 - 0.326
- - - -
0.326 - 0.326
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.087 - 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
2.175 1.523 3.698
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Bandung, 26-Sep-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
b. Pekerjaan Jendela dan Pintu 63,800,000.00 3.158
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Waktu Terpakai : 133.000
Sisa Waktu Pelaksanaan : 77.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
6.780 - 6.780
-
-
-
8.526 0.028 8.555
PROGRES PEKERJAAN (%)
5 6 7
1.534 0.782 2.316
5.282 0.099 5.381
3.063 - 3.063
0.326 - 0.326
-
-
1.254 0.135 1.390
0.087 - 0.087
1.028 - 1.028
-
-
-
2.615 - 2.615
22.123 0.835 22.958
-
-
2.175 1.523 3.698
- - -
- - -
- - -
- - -
PROGRES PEKERJAAN (%)
5 6 7
-
-
- - -
- - -
- - -
-
-
- - -
5 6 7
Bandung, 26-Sep-2016
0.732 1.364
0.000 0.100 0.200
BOBOT RENCANA 100.00
0.100 0.100 0.532 0.632
KOMULATIF BOBOT
#REF! 0.000 0.100 0.200 0.732 1.364
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
RAT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEP
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.17
F
0.890 0.890 0.890
42.672 48.
3.585 3.585 3.585 3.585 3.585
45.724
I 34.806
T 27.910
39.582
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
1.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperik
Konsultan Pengawasan Berkala Konsultan Pe
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
91.227
91.227
88.412
0.384
83.214
80.788
0.03
0.79 0.79 0.79 76.195
73.886
0.26 0.26
70.842
0.63 0.63
0.57 0.57
64.625
59.444 0.94
0.94
0.51
58.861
0.10 0.40 0.35
51.752
55.447
47.173
2 48.687
3.585 3.585 3.585
724
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
6.759 3.414
55.447 58.861
3.695 -0.584
Band 26-Sep-2016
98.600
95.901
91.227
91.227
88.412
83.214
80.788
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.550
4 Listrik dan Air Kerja Ls 1.000 0.148 0.550
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.550
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 3.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 1.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 2.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 36.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 7.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 4.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 2.835
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 -
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 0.776
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 1.189
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 422.544
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 -
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 -
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 -
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 -
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 -
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 -
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
3.063 - 3.063
- - - -
- - - -
350.000 0.326 - 0.326
- - - -
0.326 - 0.326
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.087 - 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
3.698 0.989 4.687
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
Bandung, 3-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.381
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.063
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.326
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 3.698
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 -
c. Pekerjaan Lantai 139,564,150.00 6.908 -
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 -
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 70.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.026 0.690
- 6.780
-
-
-
- 8.555
- 2.316
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
0.099 5.480
- 3.063
- 0.326
-
-
- 1.390
- 0.087
- 1.028
-
-
-
- 2.615
1.769 24.727
-
-
0.989 4.687
- -
- -
- -
- -
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
-
-
- -
- -
- -
-
-
- -
2.883 61.743
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
3-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TIM
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 20 ( Dua Puluh )
Periode
27-Sep-2016 s/d 3-Oct-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.173
48.68
F
0.890 0.890 0.890
42.672
3.585 3.585 3.585 3.585 3.585
45.724
I 34.806
39.582
T 27.910
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
91.227
91.227
88.412
0.384
83.214
80.788
0.03
0.79 0.79 0.79 76.195
73.886
0.26 0.26
70.842
0.63 0.63
0.57 0.57
64.625
47.173
48.687
4 3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
Band 3-Oct-2016
98.600
95.901
91.227
91.227
88.412
83.214
80.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.600
4 Listrik dan Air Kerja Ls 1.000 0.148 0.600
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.600
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 3.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 1.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 2.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 7.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 -
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 3.564
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 422.544
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 298.263
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik dinding 30x30 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 -
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 -
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 -
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 -
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 -
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
3.063 - 3.063
- - - -
- - - -
350.000 0.326 - 0.326
- - - -
0.326 - 0.326
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.087 - 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
4.687 0.989 5.676
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
0.50 0.50 - 0.105 0.105
- - - -
-
22.10 22.10 - 0.152 0.152
- - - -
- - - -
- - - -
- - - -
22.60 - 0.257 0.257
Bandung, 10-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.063
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.326
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 4.687
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 -
c. Pekerjaan Lantai 139,564,150.00 6.908 -
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 -
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 63.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.026 0.716
- 6.780
-
-
-
- 8.555
- 2.316
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 5.480
- 3.063
- 0.326
-
-
- 1.390
- 0.087
0.055 1.083
-
-
-
- 2.615
1.119 25.846
-
-
0.989 5.676
- -
- -
- -
- -
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
-
-
- -
- -
- -
-
-
0.257 0.257
2.446 64.189
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
10-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TIM
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 21 ( Dua Puluh Satu)
Periode
4-Oct-2016 s/d 10-Oct-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.173
F
0.890 0.890 0.890 48.68
42.672
3.585 3.585 3.585 3.58545.724
3.585
I 34.806
39.582
T 27.910
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
.000 #REF!
0.000 #REF!
0.000#REF!
0.000 0.000
0.000#REF!
0.000 0.000
#REF! #REF!0.000
#REF!0.000#REF!
0.000#REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
91.227
91.227
88.412
0.384
83.214
80.788
0.03
0.79 0.79 0.79 76.195
73.886
0.26 0.26
70.842
0.63 0.63
0.57 0.57
64.625
64.189
59.444 0.94 61.743
0.94
58.861
0.51
0.10 0.40 0.35
55.447
51.752
47.173
48.687
4 3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
Band 10-Oct-2016
98.600
95.901
91.227
91.227
88.412
83.214
80.788
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.650
4 Listrik dan Air Kerja Ls 1.000 0.148 0.650
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.650
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 3.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 1.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 2.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 7.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 422.544
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 596.526
3 Pek. Acian m2 994.210 2.101 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 -
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 -
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 -
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 -
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 0.500
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
3.063 - 3.063
- - - -
- - - -
350.000 0.326 - 0.326
- - - -
0.326 - 0.326
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.087 - 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
5.676 0.630 6.306
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
20.00 20.00 - 0.120 0.120
- - - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
12.00 12.00 - 0.015 0.015
- - - -
4.00 4.00 - 0.038 0.038
- - - -
- - - -
- - - -
36.00 - 0.174 0.174
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
0.50 0.105 - 0.105
- - - -
-
22.10 0.152 - 0.152
- - - -
- - - -
- - - -
- - - -
22.60 0.257 - 0.257
Bandung, 17-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
PEKERJAAN ARSITEKTUR
1 2 3 4
c. Pekerjaan Lantai 122,547,579.50 6.066
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798
c. Pekerjaan Lantai 139,564,150.00 6.908
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413
ADDENDUM KONTRAK
Jumlah Harga BOBOT
NO. URAIAN PEKERJAAN
Kontrak (%)
1 2 3 4
1 2 3 4
Sisa Waktu Pelaksanaan : 56.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
5 6 7
6.780 - 6.780
-
-
-
8.555 - 8.555
2.316 - 2.316
PROGRES PEKERJAAN (%)
5 6 7
5.480 - 5.480
3.063 - 3.063
0.326 - 0.326
-
-
1.390 - 1.390
0.087 - 0.087
1.083 - 1.083
-
-
-
2.615 - 2.615
25.846 - 25.846
-
-
5.676 0.630 6.306
- - -
- - -
- 1.719 1.719
- - -
PROGRES PEKERJAAN (%)
5 6 7
-
-
- - -
- - -
- 0.174 0.174
-
-
0.257 - 0.257
5 6 7
Bandung, 17-Oct-2016
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.700
4 Listrik dan Air Kerja Ls 1.000 0.148 0.700
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.700
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 3.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 1.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 2.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 1.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 -
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 -
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 7.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 -
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 -
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 -
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 -
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 422.544
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 596.526
3 Pek. Acian m2 994.210 2.101 298.263
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 248.136
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 -
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 248.136
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 -
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 20.000
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537 36.000
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 0.500
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
- - - -
305.973 0.822 - 0.822
305.973 1.139 - 1.139
9.000 0.038 - 0.038
- - - -
3.063 - 3.063
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.087 - 0.087
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
6.306 0.915 7.221
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
4.00 4.00 - 0.004 0.004
- - - -
- - - -
- - - -
- - - -
- - - -
4.00 - 0.004 0.004
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
10.00 30.00 0.120 0.060 0.181
- - - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
12.00 0.015 - 0.015
- - - -
4.00 0.038 - 0.038
- - - -
- - - -
- - - -
46.00 0.174 0.060 0.234
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
0.50 0.105 - 0.105
- - - -
-
22.10 0.152 - 0.152
- - - -
- - - -
- - - -
- - - -
22.60 0.257 - 0.257
Bandung, 24-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.063
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.326
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 6.306
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 -
c. Pekerjaan Lantai 139,564,150.00 6.908 -
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 1.719
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 49.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.026 0.768
- 6.780
-
-
-
- 8.555
- 2.316
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 5.480
- 3.063
0.137 0.463
-
-
0.817 2.206
- 0.087
- 1.083
-
-
-
- 2.615
0.363 26.208
-
-
0.915 7.221
- -
- -
0.980 2.699
- -
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
-
-
0.004 0.004
- -
0.060 0.234
-
-
- 0.257
3.302 70.041
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
24-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TIM
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 23 ( Dua Puluh Tiga)
Periode
18-Oct-2016 s/d 24-Oct-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.173
F
0.890 0.890 0.890
42.672 48.68
3.585 3.585 3.585 3.585 3.585
45.724
I 34.806
T 27.910
39.582
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
000 #REF!
0.000 #REF!
0.000 #REF!
0.000 0.000
0.000#REF!
0.000#REF!
0.000 0.000
#REF! 0.000 #REF!
#REF! 0.000#REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
91.227
91.227
88.412
0.384
83.214
80.788
0.03
0.79 0.79 0.79 76.195
73.886
0.26 0.26
70.842
0.63 0.63 70.041
0.57 0.57
64.625 66.739
64.189
59.444 0.9461.743
0.94
0.51
58.861
0.10 0.40 0.35
51.752
55.447
47.173
48.687
3.585 3.585 3.585
4
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
Band 24-Oct-2016
98.600
95.901
91.227
91.227
88.412
83.214
80.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.750
4 Listrik dan Air Kerja Ls 1.000 0.148 0.750
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.750
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 3.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 1.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 2.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 305.973
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 305.973
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 125.577
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 2.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 2.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 2.000
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 1.000
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 1.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 3.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 -
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 1.506
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 422.544
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 745.658
3 Pek. Acian m2 994.210 2.101 497.105
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 323.136
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 75.000
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 398.136
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 -
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 -
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 -
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 30.000
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 -
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 -
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 0.500
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
- - - -
33.997 339.970 0.822 0.091 0.913
33.997 339.970 1.139 0.127 1.265
9.000 0.038 - 0.038
- - - -
3.063 0.218 3.281
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.087 0.067 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
- - - -
33.720 0.050 - 0.050
2.615 - 2.615
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
7.221 0.317 7.538
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
4.00 0.004 - 0.004
58.00 58.00 - 0.067 0.067
10.00 10.00 - 0.039 0.039
10.00 10.00 - 0.068 0.068
- - - -
- - - -
0.004 0.174 0.178
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
30.00 0.181 - 0.181
- - - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
12.00 0.015 - 0.015
- - - -
4.00 0.038 - 0.038
- - - -
16.00 16.00 - 0.034 0.034
16.00 16.00 - 0.034 0.034
0.234 0.068 0.302
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
0.50 0.105 - 0.105
- - - -
-
22.10 0.152 - 0.152
- - - -
- - - -
- - - -
- - - -
0.257 - 0.257
Bandung, 31-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.063
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.463
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 7.221
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 -
c. Pekerjaan Lantai 139,564,150.00 6.908 -
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 2.699
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 42.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.026 0.794
- 6.780
-
-
-
- 8.555
- 2.316
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 5.480
0.218 3.281
0.137 0.600
-
-
- 2.206
0.067 0.154
- 1.083
-
-
-
- 2.615
0.415 26.624
-
-
0.317 7.538
- -
- -
0.921 3.620
- -
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
-
-
0.174 0.178
- -
0.068 0.302
-
-
- 0.257
2.343 72.384
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
31-Oct-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TIM
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 24 ( Dua Puluh Empat)
Periode
25-Oct-2016 s/d 31-Oct-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.173
F
0.890 0.890 0.890
42.672 48.68
3.585 3.585 3.585 3.585 3.585
45.724
I 34.806
39.582
T 27.910
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
91.227
91.227
88.412
0.384
83.214
80.788
0.03
0.79 0.79 0.79 76.195
73.886
0.26 0.26 72.384
70.842
0.63 0.63 70.041
0.57 0.57
64.625 66.739
64.189
59.444 0.9461.743
0.94
0.51
58.861
0.10 0.40 0.35
51.752
55.447
47.173
48.687
3.585 3.585 3.585
4
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
Band 31-Oct-2016
98.600
95.901
91.227
91.227
88.412
83.214
80.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.800
4 Listrik dan Air Kerja Ls 1.000 0.148 0.800
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.800
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 3.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 1.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 2.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 -
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 339.970
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 339.970
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 -
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 251.154
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 -
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 2.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 2.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 2.000
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 1.000
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 1.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 -
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 6.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 -
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 3.000
16 Pek. Instalasi Telepon titik 4.000 0.035 2.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 -
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 0.320
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 3.012
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 422.544
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 745.658
3 Pek. Acian m2 994.210 2.101 647.105
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 -
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 323.136
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 225.000
3 Pek. Pasang Nok Metalroof m' 39.000 0.151
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 -
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 58.000
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 10.000
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 10.000
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 -
Sub Jumlah Pekerjaan Sanitair 0.709
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 30.000
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 3x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 -
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 -
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 -
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 16.000
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 16.000
Sub Jumlah Pekerjaan Elektrikal 1.537
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 -
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 0.500
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
59.000 59.000 - 0.190 0.190
- 339.970 0.913 - 0.913
- 339.970 1.265 - 1.265
9.000 0.038 - 0.038
26.100 26.100 - 0.101 0.101
3.281 0.291 3.572
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.154 - 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
10.000 10.000 - 0.055 0.055
33.720 0.050 - 0.050
2.615 0.055 2.670
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
100.000 100.000 - 0.189 0.189
- - - -
- - - -
7.538 1.595 9.133
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
4.00 0.004 - 0.004
58.00 0.067 - 0.067
10.00 0.039 - 0.039
10.00 0.068 - 0.068
- - - -
1.00 1.00 - 0.199 0.199
0.178 0.199 0.377
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
30.00 0.181 - 0.181
- - - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
6.00 6.00 - 0.007 0.007
6.00 6.00 - 0.006 0.006
12.00 0.015 - 0.015
9 10 11 12 13
Bandung, 7-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.281
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.600
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 7.538
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 -
c. Pekerjaan Lantai 139,564,150.00 6.908 -
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 3.620
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 35.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
- 0.794
- 6.780
-
-
-
- 8.555
0.733 3.048
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 5.480
0.291 3.572
0.226 0.827
-
-
0.659 2.865
- 0.154
0.049 1.132
-
-
-
0.055 2.670
1.088 27.712
-
-
1.595 9.133
- -
- -
0.446 4.066
- -
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
-
-
0.199 0.377
- -
0.028 0.330
-
-
0.034 0.292
5.403 77.787
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
7-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TI
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 25 ( Dua Puluh Lima)
Periode
1-Nov-2016 s/d 7-Nov-2016
0.732 1.364
0.000 0.100 0.200
BOBOT RENCANA 100.00
0.100 0.100 0.532 0.632
KOMULATIF BOBOT
#REF! 0.000 0.100 0.200 0.732 1.364
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.1
F
0.890 0.890 0.890
42.67248.687
3.585 3.585 3.585 3.585 3.585
45.724
I 34.806
T 27.910
39.582
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
1.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
000 #REF!
0.000 #REF!
0.000 #REF!
0.000 0.000
0.000#REF!
0.000#REF!
0.000#REF!
0.000 0.000 #REF!
#REF!
0.000 #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
91.227
91.227
88.412
0.384
83.214
80.788
0.03 77.787
0.79 0.79 0.79 76.195
73.886
0.26 0.26 72.384
70.842
0.63 0.63 70.041
0.57 0.57
64.625 66.739
64.189
0.94 59.444
0.94
61.743
0.51
58.861
0.10 0.40 0.35
51.752
55.447
47.173
8.687
3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
Bandu 7-Nov-2016
98.600
95.901
91.227
91.227
88.412
83.214
0.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.800
4 Listrik dan Air Kerja Ls 1.000 0.148 0.800
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.800
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 7.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 2.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 5.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 59.000
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 339.970
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 339.970
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 26.100
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 418.590 0.458 418.590
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 35.000 0.043 35.000
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 3.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 3.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 3.000
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 3.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 2.000
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 2.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 1.000
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 6.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 2.000
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 4.000
16 Pek. Instalasi Telepon titik 4.000 0.035 4.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 -
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 10.000
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 4.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 -
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 0.320
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 210.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 7.530
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 497.110
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 845.658
3 Pek. Acian m2 994.210 2.101 847.105
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 100.000
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 -
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 -
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 -
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m' 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 323.136
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 275.000
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 -
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 -
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 51.000
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 -
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 -
9 Pek Talang Datar m2 9.000 0.038 -
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 58.000
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 10.000
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 10.000
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 1.000
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 -
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 -
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 -
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 30.000
7 Pek. Pemasangan lampu RMI 1x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 2x36 cm Set 10.000 0.193 -
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 6.000
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 6.000
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 2.000
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 16.000
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 16.000
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUME
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 5.000
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 -
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 0.500
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 -
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 -
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
59.000 0.190 - 0.190
- 339.970 0.913 - 0.913
- 339.970 1.265 - 1.265
9.000 0.038 - 0.038
26.100 0.101 - 0.101
3.572 - 3.572
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.154 - 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
10.000 0.055 - 0.055
33.720 0.050 - 0.050
2.670 - 2.670
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
100.000 0.189 - 0.189
- - - -
- - - -
9.133 0.543 9.676
- - - -
- - - -
- - - -
- - - -
6.000 6.000 - 0.445 0.445
- - - -
- - - -
- - - -
- - - -
6.000 - 0.445 0.445
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
4.00 0.004 - 0.004
58.00 0.067 - 0.067
10.00 0.039 - 0.039
10.00 0.068 - 0.068
- - - -
1.00 0.199 - 0.199
0.377 - 0.377
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
1.00 1.00 - 0.012 0.012
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
1.00 1.00 - 0.012 0.012
- 0.025 0.025
9 10 11 12 13
- - - -
6.00 0.007 - 0.007
6.00 0.006 - 0.006
12.00 0.015 - 0.015
9 10 11 12 13
Bandung, 14-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.827
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 9.133
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 -
c. Pekerjaan Lantai 139,564,150.00 6.908 -
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 4.066
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 28.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
- 0.794
- 6.780
- 8.555
- 3.048
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 5.480
- 3.572
- 0.827
0.137 3.002
- 0.154
0.005 1.138
- 2.670
0.741 28.453
0.543 9.676
0.445 0.445
2.093 2.093
2.486 6.552
-
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 0.377
0.025 0.025
0.339 0.668
0.753 1.045
7.567 85.354
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
14-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TI
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 26 ( Dua Puluh Enam)
Periode
8-Nov-2016 s/d 14-Nov-2016
0.732 1.364
0.000 0.100 0.200
BOBOT RENCANA 100.00
0.100 0.100 0.532 0.632
KOMULATIF BOBOT
#REF! 0.000 0.100 0.200 0.732 1.364
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.1
F
0.890 0.890 0.890
42.672 48.6
3.585 3.585 3.585 3.585 3.585
45.724
I 34.806
T 27.910
39.582
R 31.561
31.561
I 20.401
14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
91.227
91.227
88.412
85.354
0.384
83.214
80.788
0.03 77.787
0.79 0.79 0.79 76.195
73.886
0.26 0.26 72.384
70.842
0.63 0.63 70.041
0.57 0.57
64.625 66.739
64.189
0.94 59.444
0.94 61.743
0.51
58.861
0.10 0.40 0.35
51.752
55.447
47.173
48.687
3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
Bandu 14-Nov-2016
98.600
95.901
91.227
91.227
88.412
83.214
0.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.800
4 Listrik dan Air Kerja Ls 1.000 0.148 0.800
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.800
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 7.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 2.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 5.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 59.000
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 339.970
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 339.970
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 26.100
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 418.590 0.458 418.590
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 35.000 0.043 35.000
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 3.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 4.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 3.000
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 3.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 2.000
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 2.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 1.000
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 6.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 2.000
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 4.000
16 Pek. Instalasi Telepon titik 4.000 0.035 4.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 2.000
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 10.000
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 10.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 18.000
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 0.320
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 250.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 7.530
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 497.110
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 945.658
3 Pek. Acian m2 994.210 2.101 947.105
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 100.000
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 6.000
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 -
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 -
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 6.000
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 11.250
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 150.000
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m' 57.250 0.827 -
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 161.250
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 354.480
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 354.480
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 39.000
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 13.000
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 68.000
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 175.000
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 279.280
9 Pek Talang Datar m2 9.000 0.038 9.000
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 58.000
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 10.000
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 10.000
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 1.000
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 1.000
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 -
9 Pek. Pilot Lamp buah 3.000 0.002 -
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 -
11 Pek. Selector Switch buah 1.000 0.008 -
12 Pek. Amper Meter buah 3.000 0.029 -
13 Pek. Volt Meter buah 1.000 0.010 -
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 1.000
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 50.000
7 Pek. Pemasangan lampu RMI 1x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 2x36 cm Set 10.000 0.193 10.000
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 6.000
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 6.000
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 2.000
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 16.000
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 16.000
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 5.000
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 15.000
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 1.000
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 1.000
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 33.150
o. Acian m2 33.150 0.070 -
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
59.000 0.190 - 0.190
- 339.970 0.913 - 0.913
- 339.970 1.265 - 1.265
9.000 0.038 - 0.038
26.100 0.101 - 0.101
3.572 - 3.572
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.154 - 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
10.000 0.055 - 0.055
33.720 0.050 - 0.050
2.670 - 2.670
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
100.000 0.189 - 0.189
- - - -
- - - -
9.676 0.261 9.937
- - - -
- - - -
- - - -
- - - -
6.000 12.000 0.445 0.445 0.891
3.000 3.000 - 0.048 0.048
1.000 1.000 - 0.016 0.016
- - - -
- - - -
16.000 0.445 0.510 0.955
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
4.00 0.004 - 0.004
58.00 0.067 - 0.067
10.00 0.039 - 0.039
10.00 0.068 - 0.068
- - - -
1.00 0.199 - 0.199
0.377 - 0.377
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
1.00 0.012 - 0.012
1.00 1.00 - 0.045 0.045
1.00 1.00 - 0.001 0.001
1.00 1.00 - 0.000 0.000
1.00 1.00 - 0.008 0.008
1.00 1.00 - 0.010 0.010
1.00 1.00 - 0.010 0.010
1.00 0.012 - 0.012
0.025 0.074 0.098
9 10 11 12 13
- - - -
6.00 0.007 - 0.007
6.00 0.006 - 0.006
12.00 0.015 - 0.015
9 10 11 12 13
Bandung, 21-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.827
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 9.676
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 0.445
c. Pekerjaan Lantai 139,564,150.00 6.908 2.093
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 6.552
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 28.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
- 0.794
- 6.780
- 8.555
- 3.048
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 5.480
- 3.572
- 0.827
- 3.002
- 0.154
- 1.138
- 2.670
- 28.453
0.261 9.937
0.510 0.955
0.963 3.056
0.298 6.850
-
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 0.377
0.074 0.098
- 0.668
0.070 1.115
2.175 87.529
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
21-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
TI
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 27 ( Dua Puluh Enam)
Periode
15-Nov-2016 s/d 21-Nov-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.1
42.672
F
0.890 0.890 0.890
48.6
3.585 3.585 3.585 3.585 3.585
34.806 45.724
I
27.910 39.582
T
R 20.401
31.561
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
98.600
0.100 0.100 0.100 95.901 0.100
91.227
88.412
87.529
87.529
83.214
85.354
0.384 80.788
76.195
0.03 73.886 77.787
0.79 0.79 70.842
0.79
0.26 0.26 72.384
0.63 64.625
0.63 70.041
0.57 0.57
59.444 66.739
64.189
0.94 0.94 61.743
51.752 0.51
58.861
0.10 0.40 0.35
47.173 55.447
48.687
3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
6.759 3.414 2.883 2.446 2.550 3.302 2.343 5.403 7.567 2.175
55.447 58.861 61.743 64.189 66.739 70.041 72.384 77.787 85.354 87.529
3.695 -0.584 -2.882 -6.652 -7.147 -6.155 -8.404 -5.427 -3.059 -3.698
Bandu 21-Nov-2016
98.600
95.901
91.227
88.412
83.214
0.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PROVINSI
PEMERINTAH PERMUKIMAN DAN PERUMAHAN
JAWA BARAT
DINAS PERMUKIMAN
BALAI PENGELOLAAN DAN PERUMAHAN
DAN PELAYANAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN DAN
Jl. Kawaluyaan Indah No. PELAYANAN
4 Telp. (022) 7332078 –PERUMAHAN
7319735 JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D Fax
U N: (022)
G – 40286
7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.480
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.827
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 9.937
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 0.955
c. Pekerjaan Lantai 139,564,150.00 6.908 3.056
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 28.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.052 0.846
- 6.780
- 8.555
- 3.048
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
0.359 5.839
- 3.572
- 0.827
- 3.002
- 0.154
0.105 1.243
- 2.670
- 28.453
0.366 10.303
0.703 1.658
2.675 5.731
- 6.850
-
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
0.332 0.709
- 0.098
0.144 0.812
- 1.115
4.737 92.266
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
28-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.800
4 Listrik dan Air Kerja Ls 1.000 0.148 0.800
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.800
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 7.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 2.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 5.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 -
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 -
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 -
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 59.000
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 339.970
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 339.970
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 26.100
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 418.590 0.458 418.590
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 35.000 0.043 35.000
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 3.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 4.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 3.000
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 3.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 2.000
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 2.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 1.000
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 6.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 2.000
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 -
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 4.000
16 Pek. Instalasi Telepon titik 4.000 0.035 4.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 -
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 2.000
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 10.000
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur -
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 10.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 18.000
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 0.320
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 250.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 7.530
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding -
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 497.110
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 994.210
3 Pek. Acian m2 994.210 2.101 994.210
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 100.000
5 Pek. Acian Listplang Beton m2 15.000 0.028 -
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 -
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu -
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 -
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 -
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 -
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 12.000
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 3.000
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 1.000
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 16.000
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai -
1 Pek. Urugan Pasir Urug m3 11.250 0.050 11.250
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 202.500
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 -
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 -
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m' 57.250 0.827 17.175
7 Pek. Floor Hardener m2 230.200 0.855 -
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 -
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 230.925
d. Pekerjaan Atap dan Plafond -
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 354.480
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 354.480
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 39.000
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 13.000
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 68.000
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 286.060
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 279.280
9 Pek Talang Datar m2 9.000 0.038 9.000
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan -
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair -
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 -
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 -
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 -
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 -
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 -
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 58.000
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 10.000
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 10.000
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 -
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 1.000
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal -
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 1.000
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 1.000
9 Pek. Pilot Lamp buah 3.000 0.002 1.000
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 1.000
11 Pek. Selector Switch buah 1.000 0.008 1.000
12 Pek. Amper Meter buah 3.000 0.029 1.000
13 Pek. Volt Meter buah 1.000 0.010 1.000
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 1.000
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 50.000
7 Pek. Pemasangan lampu RMI 1x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 2x36 cm Set 10.000 0.193 10.000
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 -
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 6.000
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 6.000
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 2.000
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 16.000
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 16.000
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 5.000
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 15.000
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 1.000
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 1.000
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 33.150
o. Acian m2 33.150 0.070 33.150
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
- - - -
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 - 6.780
9 10 11 12 13
9 10 11 12 13
59.000 0.190 - 0.190
- 339.970 0.913 - 0.913
- 339.970 1.265 - 1.265
9.000 0.038 - 0.038
26.100 0.101 - 0.101
3.572 - 3.572
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.154 - 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
10.000 0.055 - 0.055
33.720 0.050 - 0.050
2.670 - 2.670
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
100.000 0.189 - 0.189
15.000 15.000 - 0.028 0.028
38.500 38.500 - 0.338 0.338
9.937 0.366 10.303
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
- - - -
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
1.00 0.012 - 0.012
1.00 0.045 - 0.045
1.00 0.001 - 0.001
1.00 0.000 - 0.000
1.00 0.008 - 0.008
1.00 0.010 - 0.010
1.00 0.010 - 0.010
1.00 0.012 - 0.012
0.098 - 0.098
9 10 11 12 13
- - - -
6.00 0.007 - 0.007
6.00 0.006 - 0.006
12.00 0.015 - 0.015
9 10 11 12 13
Bandung, 28-Nov-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.1
42.672
F
0.890 0.890 0.890
48.6
3.585 3.585 3.585 3.585 3.585
34.806 45.724
I
27.910 39.582
T
R 20.401
31.561
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
98.600
0.100 0.100 0.100 95.901 0.100
91.227
88.412
87.529
87.529
83.214
85.354
0.384 80.788
76.195
0.03 73.886 77.787
0.79 0.79 70.842
0.79
0.26 0.26 72.384
0.63 64.625
0.63 70.041
0.57 0.57
59.444 66.739
64.189
0.94 0.94 61.743
51.752 0.51
58.861
0.10 0.40 0.35
47.173 55.447
48.687
3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
6.759 3.414 2.883 2.446 2.550 3.302 2.343 5.403 7.567 2.175
55.447 58.861 61.743 64.189 66.739 70.041 72.384 77.787 85.354 87.529
3.695 -0.584 -2.882 -6.652 -7.147 -6.155 -8.404 -5.427 -3.059 -3.698
Bandu 21-Nov-2016
98.600
95.901
91.227
88.412
83.214
0.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PROVINSI
PEMERINTAH PERMUKIMAN DAN PERUMAHAN
JAWA BARAT
DINAS PERMUKIMAN
BALAI PENGELOLAAN DAN PERUMAHAN
DAN PELAYANAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN DAN
Jl. Kawaluyaan Indah No. PELAYANAN
4 Telp. (022) 7332078 –PERUMAHAN
7319735 JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D Fax
U N: (022)
G – 40286
7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 5
PEKERJAAN ARSITEKTUR
1 2 3 4 5
c. Pekerjaan Lantai 122,547,579.50 6.066 5.839
d. Pekerjaan Atap dan Plafond 72,167,435.50 3.572 3.572
e. Pekerjaan Pengecatan dan Laburan 22,895,589.00 1.133 0.827
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 10.303
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 1.658
c. Pekerjaan Lantai 139,564,150.00 6.908 5.731
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 -
ADDENDUM KONTRAK PROG
1 2 3 4 5
1 2 3 4 5
Sisa Waktu Pelaksanaan : 28.000
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung,
6 7
0.052 0.898
0.384 7.164
- 8.555
- 3.048
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
0.062 5.901
- 3.572
- 0.827
0.054 3.057
- 0.154
- 1.243
- 2.670
- 28.453
0.153 10.456
0.208 1.866
0.621 6.352
- 6.850
1.413 1.413
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
- 0.709
- 0.098
0.514 1.326
0.044 1.159
3.506 95.772
PROGRES PEKERJAAN (%)
Sampai Dengan
Minggu Ini
Minggu Ini
6 7
5-Dec-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
Ir. YUNAGRADELAS
Direktur
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 0.900
4 Listrik dan Air Kerja Ls 1.000 0.148 0.900
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 0.900
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 -
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 7.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 2.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 5.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 22.000
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 15.000
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 19.200
8 Pek. Pemasangan waterproofing m2 22.000 0.062 -
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 59.000
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 339.970
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 339.970
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 26.100
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 418.590 0.458 418.590
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 35.000 0.043 35.000
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 3.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 4.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 3.000
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 3.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 2.000
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 2.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 1.000
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 6.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 2.000
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 3.000
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 8.000
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 4.000
16 Pek. Instalasi Telepon titik 4.000 0.035 4.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 2.000
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 2.000
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 10.000
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 10.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 18.000
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 0.320
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 250.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 7.530
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 497.110
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 994.210
3 Pek. Acian m2 994.210 2.101 994.210
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 100.000
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 38.500
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 1.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 2.000
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 1.000
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 -
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 12.000
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 3.000
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 1.000
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 20.000
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050 11.250
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 202.500
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 30.000
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 132.300
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m' 57.250 0.827 17.175
7 Pek. Floor Hardener m2 230.200 0.855 230.200
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 64.850
11 Pek. Pemasangan waterproofing m2 15.000 0.042 -
Sub Jumlah Pekerjaan Lantai 6.908 688.275
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 354.480
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 354.480
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 39.000
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 13.000
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 68.000
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 286.060
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 279.280
9 Pek Talang Datar m2 9.000 0.038 9.000
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 445.420 0.487 -
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 305.900 0.424 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 460.000 0.428 -
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 60.000 0.074 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 1.000
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 1.000
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 1.000
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 1.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 1.000
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 58.000
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 10.000
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 10.000
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 1.000
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 1.000
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 1.000
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 1.000
9 Pek. Pilot Lamp buah 3.000 0.002 1.000
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 1.000
11 Pek. Selector Switch buah 1.000 0.008 1.000
12 Pek. Amper Meter buah 3.000 0.029 1.000
13 Pek. Volt Meter buah 1.000 0.010 1.000
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 1.000
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 50.000
7 Pek. Pemasangan lampu RMI 1x36 cm Set 9.000 0.141 -
8 Pek. Pemasangan lampu RMI 2x36 cm Set 10.000 0.193 10.000
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 21.000
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 8.000
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 6.000
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 6.000
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 2.000
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 -
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 16.000
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 16.000
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 5.000
b. Pekerjaan Bak Kontrol buah 7.000 0.044 -
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 15.000
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 1.000
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 1.000
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 33.150
o. Acian m2 33.150 0.070 33.150
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
136.400 136.400 - 0.384 0.384
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
6.780 0.384 7.164
9 10 11 12 13
9 10 11 12 13
59.000 0.190 - 0.190
- 339.970 0.913 - 0.913
- 339.970 1.265 - 1.265
9.000 0.038 - 0.038
26.100 0.101 - 0.101
3.572 - 3.572
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.154 - 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
10.000 0.055 - 0.055
33.720 0.050 - 0.050
2.670 - 2.670
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
81.040 181.040 0.189 0.153 0.341
15.000 0.028 - 0.028
38.500 0.338 - 0.338
10.303 0.153 10.456
9 10 11 12 13
9 10 11 12 13
1,271.32 - 1.413 1.413
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
1.00 0.012 - 0.012
1.00 0.045 - 0.045
1.00 0.001 - 0.001
1.00 0.000 - 0.000
1.00 0.008 - 0.008
1.00 0.010 - 0.010
1.00 0.010 - 0.010
1.00 0.012 - 0.012
0.098 - 0.098
9 10 11 12 13
- - - -
6.00 0.007 - 0.007
6.00 0.006 - 0.006
12.00 0.015 - 0.015
9 10 11 12 13
Bandung, 5-Dec-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.1
42.672
F
0.890 0.890 0.890
48.6
3.585 3.585 3.585 3.585 3.585
34.806 45.724
I
27.910 39.582
T
R 20.401
31.561
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
98.600
0.100 0.100 0.100 95.901 0.100
91.227
88.412
87.529
87.529
83.214
85.354
0.384 80.788
76.195
0.03 73.886 77.787
0.79 0.79 70.842
0.79
0.26 0.26 72.384
0.63 64.625
0.63 70.041
0.57 0.57
59.444 66.739
64.189
0.94 0.94 61.743
51.752 0.51
58.861
0.10 0.40 0.35
47.173 55.447
48.687
3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
6.759 3.414 2.883 2.446 2.550 3.302 2.343 5.403 7.567 2.175
55.447 58.861 61.743 64.189 66.739 70.041 72.384 77.787 85.354 87.529
3.695 -0.584 -2.882 -6.652 -7.147 -6.155 -8.404 -5.427 -3.059 -3.698
Bandu 21-Nov-2016
98.600
95.901
91.227
88.412
83.214
0.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN PELAYANAN
(022) 7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371 1.000
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124 1.000
4 Listrik dan Air Kerja Ls 1.000 0.148 1.000
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247 1.000
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898 -
II. PEKERJAAN KONSTRUKSI -
A. BAGIAN KONTRAK I BANGUNAN BELAKANG -
PEKERJAAN STRUKTUR -
b. Pekerjaan Struktur
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293 15.536
4 Pek. Pemasangan waterproofing m2 136.400 0.384 136.400
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496 1.873
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475 2.268
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203 1.238
Sub Jumlah Pekerjaan Struktur 7.164 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499 753.518
3 Pek. Acian m2 608.988 1.287 608.988
4 Pek. Acian Kolom m2 92.160 0.174 92.160
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270 144.780
Sub Jumlah Pekerjaan Dinding 8.555 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641 7.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183 2.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458 5.000
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027 2.000
9 Pek. Pas. Railling Tangga m' 11.050 0.109 -
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158 -
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 16.945 0.075 16.945
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168 22.000
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027 15.000
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329 19.200
8 Pek. Pemasangan waterproofing m2 22.000 0.062 22.000
Sub Jumlah Pekerjaan Lantai 6.066 -
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987 160.890
2 Pek. Pasang Nok Metalroof m' 9.330 0.036 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041 14.670
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190 59.000
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913 339.970
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265 339.970
7 Pek. Jurai Talang m2 9.000 0.038 9.000
8 Pek. Flasing m2 26.100 0.101 26.100
Sub Jumlah Pekerjaan Atap dan Plafond 3.572 -
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 418.590 0.458 418.590
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 247.590 0.306 -
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 350.000 0.326 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 35.000 0.043 35.000
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489 3.000
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546 4.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423 3.000
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033 3.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163 3.000
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193 28.500
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010 2.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126 1.000
Sub Jumlah Pekerjaan Sanitair 3.057 -
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134 6.000
3 Pek. Pemasangan Antena TV Titik 1.000 0.007 -
4 Pek. Grounding Unit 1.000 0.020 1.000
5 Pek. Pemasangan Smoke Detector - -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
- Smoke Detector Unit 7.000 0.061 -
- Heat Detector Unit 2.000 0.007 -
- Bel Alarm Unit 1.000 0.007 -
- Break Glass Unit 1.000 0.006 -
- Hambatan Tepi Unit 2.000 0.005 -
- CTBFA Unit 1.000 0.171 -
6 Pek. Instalasi CCTV - -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445 -
7 Pek. Pasang Alarm Unit 1.000 0.074 -
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079 -
9 Pek. Test Comisioning Unit 1.000 0.012 -
Sub Jumlah Pekerjaan Mekanikal 1.030 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
C. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 2.000
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011 4.000
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025 2.000
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047 3.000
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174 8.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126 24.000
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 8.000
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
15 Pek. Instalasi CCTV titk 6.000 0.045 4.000
16 Pek. Instalasi Telepon titik 4.000 0.035 4.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085 40.000
19 Pek. Pemasangan lampu dinding buah 2.000 0.025 2.000
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005 2.000
Sub Jumlah Pekerjaan Elektrikal 1.277 -
B. BAGIAN KONTRAK II BANGUNAN DEPAN -
PEKERJAAN STRUKTUR -
a. Pekerjaan Galian dan Urugan
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055 10.000
5 Pek. Urugan Tanah Kembali m3 33.720 0.050 33.720
Sub Jumlah Pekerjaan Galian dan Urugan 2.670 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Struktur
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563 10.000
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036 18.000
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330 4.600
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053 0.320
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865 8.910
12 Pek. B1 (Balok) m3 13.520 3.181 13.520
13 Pek. B3 (Balok) m3 3.200 0.710 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208 250.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813 7.530
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630 2.378
Sub Jumlah Pekerjaan Struktur 28.684 -
PEKERJAAN ARSITEKTUR -
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350 497.110
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297 994.210
3 Pek. Acian m2 994.210 2.101 994.210
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
4 Pek. Acian Kolom m2 181.040 0.341 181.040
5 Pek. Acian Listplang Beton m2 15.000 0.028 15.000
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338 38.500
Sub Jumlah Pekerjaan Dinding 10.456 -
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396 1.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178 2.000
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129 1.000
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417 4.950
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336 12.000
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048 3.000
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016 1.000
8 Pek. Pas. Railling Tangga m' 12.480 0.154 -
9 Pek. Pas. Railling Tangga m' 12.480 0.124 -
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 24.950
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050 11.250
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758 202.500
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279 30.000
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986 132.300
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m' 57.250 0.827 57.255
7 Pek. Floor Hardener m2 230.200 0.855 230.200
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111 64.850
11 Pek. Pemasangan waterproofing m2 15.000 0.042 15.000
Sub Jumlah Pekerjaan Lantai 6.908 743.355
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456 354.480
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176 354.480
3 Pek. Pasang Nok Metalroof m' 39.000 0.151 39.000
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036 13.000
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185 68.000
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769 286.060
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040 279.280
9 Pek Talang Datar m2 9.000 0.038 9.000
Sub Jumlah Pekerjaan Atap dan Plafond 6.850 -
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 445.420 0.487 445.420
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 305.900 0.424 305.900
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vin m2 460.000 0.428 460.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 60.000 0.074 60.000
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 1,271.320
PEKERJAAN MEKANIKAL & ELEKTRIKAL -
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163 1.000
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137 1.000
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014 1.000
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011 1.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003 1.000
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067 58.000
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039 10.000
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068 10.000
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005 1.000
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199 1.000
Sub Jumlah Pekerjaan Sanitair 0.709 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067 -
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017 -
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012 -
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012 -
7 Pek. SDP AC bh 1.000 0.012 1.000
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089 1.000
9 Pek. Pilot Lamp buah 3.000 0.002 1.000
10 Pek. Fuse Pilot Lamp buah 3.000 0.001 1.000
11 Pek. Selector Switch buah 1.000 0.008 1.000
12 Pek. Amper Meter buah 3.000 0.029 1.000
13 Pek. Volt Meter buah 1.000 0.010 1.000
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025 1.000
Sub Jumlah Pekerjaan Mekanikal 0.286 -
c. Pekerjaan Elektrikal -
1 Pek. Pemasangan Box Panel Unit 2.000 0.049 1.000
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011 -
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027 -
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086 -
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013 -
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301 50.000
7 Pek. Pemasangan lampu RMI 1x36 cm Set 9.000 0.141 9.000
8 Pek. Pemasangan lampu RMI 2x36 cm Set 10.000 0.193 10.000
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110 21.000
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034 8.000
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049 -
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007 6.000
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006 6.000
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015 12.000
17 Pek Pemasangan instalasi Stop Kontak -
18 Pek. Pemasangan Antena TV Titik 2.000 0.015 2.000
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373 50.000
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034 16.000
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034 16.000
Sub Jumlah Pekerjaan Elektrikal 1.537 -
ADDENDUM KONTRAK VOLUM
Sampai
NO. URAIAN PEKERJAAN BOBOT
SATUAN VOLUME
(%) Dengan
Minggu Lalu
1 2 3 4 7 8
3. POS SATPAM & GROUNDTANK -
h. Pekerjaan Pelengkap -
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206 5.000
b. Pekerjaan Bak Kontrol buah 7.000 0.044 7.000
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089 15.000
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177 -
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210 1.000
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449 1.000
g. Pekerjaan Foyer - -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110 33.150
o. Acian m2 33.150 0.070 33.150
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 33.150 0.030 -
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243 -
1.779
1 2 3 4 7 8
9 10 11 12 13
9 10 11 12 13
4.111 0.951 - 0.951
1.744 0.362 - 0.362
15.536 4.293 - 4.293
136.400 0.384 - 0.384
1.873 0.496 - 0.496
2.268 0.475 - 0.475
1.238 0.203 - 0.203
7.164 - 7.164
9 10 11 12 13
9 10 11 12 13
59.000 0.190 - 0.190
- 339.970 0.913 - 0.913
- 339.970 1.265 - 1.265
9.000 0.038 - 0.038
26.100 0.101 - 0.101
3.572 - 3.572
9 10 11 12 13
9 10 11 12 13
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
-
- - - -
- - - -
- - - -
- - - -
0.154 - 0.154
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
1.000 0.001 - 0.001
102.400 0.460 - 0.460
376.834 2.104 - 2.104
10.000 0.055 - 0.055
33.720 0.050 - 0.050
2.670 - 2.670
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
9 10 11 12 13
181.040 0.341 - 0.341
15.000 0.028 - 0.028
38.500 0.338 - 0.338
10.456 - 10.456
9 10 11 12 13
9 10 11 12 13
1,271.32 1.413 - 1.413
9 10 11 12 13
9 10 11 12 13
- - - -
6.00 0.007 - 0.007
6.00 0.006 - 0.006
12.00 0.015 - 0.015
9 10 11 12 13
Bandung, 12-Dec-2016
Dibuat Oleh :
Kontraktor Pelaksana
CV. LINGGASARI
VOLUME PEKERJAAN PROGRES PEKERJAAN (%)
Sampai Sampai Sampai
Minggu Ini Dengan Dengan Minggu Ini Dengan
Minggu Ini Minggu Lalu Minggu Ini
9 10 11 12 13
B A N D U N G – 40286
1 2 3 4 5 6 7
PEKERJAAN ARSITEKTUR
1 2 3 4 5 6 7
B. BAGIAN KONTRAK II BANGUNAN DEPAN
PEKERJAAN STRUKTUR
a. Pekerjaan Galian dan Urugan 53,939,099.20 2.670 2.670 - 2.670
ADDENDUM KONTRAK PROGRES PEKERJAAN (%)
1 2 3 4 5 6 7
b. Pekerjaan Struktur 579,519,579.90 28.684 28.453 - 28.453
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding 211,245,209.00 10.456 10.456 - 10.456
b. Pekerjaan Jendela dan Pintu 56,531,000.00 2.798 1.866 - 1.866
c. Pekerjaan Lantai 139,564,150.00 6.908 6.352 - 6.352
d. Pekerjaan Atap dan Plafond 138,400,232.80 6.850 6.850 - 6.850
e. Pekerjaan Pengecatan dan Laburan 28,556,982.00 1.413 1.413 - 1.413
1 2 3 4 5 6 7
Sisa Waktu Pelaksanaan : -
ADDENDUM KONTRAK PROGRES PEKERJAAN (%)
1 2 3 4 5 6 7
Jenis pekerjaan yang kami nyatakan telah selesai dengan baik dan sesuai persyaratan yang tercantum didalam kontrak dan dokumen pelelangan.
Bandung, 12-Dec-2016
DIDIET PRIBADI AFIATIN, BE. WIKI WIDIA PERMADI,ST HARLIANSYAH Ir. YUNAGRADELAS
NIP. 19600128 199103 1 002 Team Leader Team Leader Direktur
TI
Kegiatan :
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
Pekerjaan
PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3
Minggu ke - 27 ( Dua Puluh Enam)
Periode
15-Nov-2016 s/d 21-Nov-2016
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa
AT (BP3JB)
14/06/16 21/06/16 28/06/16 05/07/16 12/07/16 19/07/16 26/07/16 02/08/16 09/08/16 16/08/16 23/08/16 30/08/16 06/09/16
20/06/16 27/06/16 04/07/16 11/07/16 18/07/16 25/07/16 01/08/16 08/08/16 15/08/16 22/08/16 29/08/16 05/09/16 12/09/16
JUNI JULI AGUSTUS SEPT
29-35 36-42 43-49 50-56 57-63 64-70 71-77 78-84 85-91 92-98 99-105 106-112 113-119
5 6 7 8 9 10 11 12 13 14 15 16 17
L
I 0.100 0.100
U
R
0.951 0.858 0.828 0.828 0.828 0.828 0.828 0.828
E 0.63 0.63
1.85 1.85 1.85
D
U 0.11 0.15 0.34 0.46
0.51
0.13
L 0.21 0.21
47.1
42.672
F
0.890 0.890 0.890
48.6
3.585 3.585 3.585 3.585 3.585
34.806 45.724
I
27.910 39.582
T
R 20.401
31.561
31.561
I 14.140
10.674
7.900
5.036 5.036 5.036
2.271 3.178
.364
0.907 0.907 1.858 0.000 0.000 2.863 2.774 3.466 6.262 7.508 6.896 7.866 4.501
2.271 3.178 5.036 5.036 5.036 7.900 10.674 14.140 20.401 27.910 34.806 42.672 47.173
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
#REF! #REF! #REF! 0.000 #REF! #REF! #REF! #REF! #REF! #REF! 8.021 6.142 2.964
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 31.561 39.582 45.724 48.687
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! 3.652 4.776 3.052 1.514
Diperiksa Diperiks
Konsultan Pengawasan Berkala Konsultan Pen
PT. TRIBUANA REKAYASA PT. PURI
13/09/16 20/09/16 27/09/16 04/10/16 11/10/16 18/10/16 25/10/16 01/11/16 08/11/16 15/11/16 22/11/16 29/11/16 06/12/16
19/09/16 26/09/16 03/10/16 10/10/16 17/10/16 24/10/16 31/10/16 07/11/16 14/11/16 21/11/16 28/11/16 05/12/16 12/12/16
SEPTEMBER OKTOBER NOVEMBER DES
120-126 127-133 134-140 141-147 148-154 155-161 162-168 169-175 176-182 183-189 190-196 197-203 204-210
18 19 20 21 22 23 24 25 26 27 28 29 30
98.600
0.100 0.100 0.100 95.901 0.100
91.227
88.412
87.529
87.529
83.214
85.354
0.384 80.788
76.195
0.03 73.886 77.787
0.79 0.79 70.842
0.79
0.26 0.26 72.384
0.63 64.625
0.63 70.041
0.57 0.57
59.444 66.739
64.189
0.94 0.94 61.743
51.752 0.51
58.861
0.10 0.40 0.35
47.173 55.447
48.687
3.585 3.585 3.585
4.579 7.692 5.181 6.217 3.044 2.309 4.593 2.426 5.198 2.815 4.674 2.699 1.400
51.752 59.444 64.625 70.842 73.886 76.195 80.788 83.214 88.412 91.227 95.901 98.600 100.00
6.759 3.414 2.883 2.446 2.550 3.302 2.343 5.403 7.567 2.175 4.737 3.506 0.72
55.447 58.861 61.743 64.189 66.739 70.041 72.384 77.787 85.354 87.529 92.266 95.772 96.488
3.695 -0.584 -2.882 -6.652 -7.147 -6.155 -8.404 -5.427 -3.059 -3.698 -3.635 -2.829 -3.512
Bandu 21-Nov-2016
98.600
95.901
91.227
88.412
83.214
0.788
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
DINAS PERMUKIMAN
PEMERINTAH PROVINSI DAN JAWAPERUMAHAN
BARAT
DINAS
BALAI PERMUKIMAN
PENGELOLAAN DAN DANPELAYANAN
PERUMAHAN PERUMAHAN JAWA BARAT
BALAI PENGELOLAAN
Jl. Kawaluyaan Indah No. 4 Telp.DAN
(022) PELAYANAN
7332078 – 7319735PERUMAHAN JAWA BARAT
Jl. Kawaluyaan Indah No. 4 Telp. (022) 7332078 – 7319735
Fax : (022) 7332078 Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
BFax
AN D U7332078
: (022) N G – 40286
Website : diskimrum.jabarprov.go.id e-Mail : bpppjawabarat@gmail.com
B A N D U N G – 40286
1 2 3 4 5 6 7 8
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.000 0.007
2 Pek. Alat Bantu Scoppolding/bambu Ls 1.000 0.371
3 Mobilisasi dan Demobilisasi Ls 1.000 0.124
4 Listrik dan Air Kerja Ls 1.000 0.148
5 Administrasi, Dokumentasi, dan Pelaporan Ls 1.000 0.247
SUB JUMLAH PEKERJAAN PERSIAPAN 0.898
II. PEKERJAAN KONSTRUKSI
A. BAGIAN KONTRAK I BANGUNAN BELAKANG
PEKERJAAN STRUKTUR
b. Pekerjaan Struktur
1 Pek. Kolom 15 x 15 Cm m3 4.111 0.951
2 Pek. Balok lintel 15 x 15 Cm m3 1.744 0.362
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 15.536 4.293
4 Pek. Pemasangan waterproofing m2 136.400 0.384
5 Pek. Topi Beton T= 10 cm m3 1.873 0.496
6 Pek. Balok Beton 15 x 40 cm m3 2.268 0.475
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
7 Pek. Balok Beton 15 x 25 cm m3 1.238 0.203
Sub Jumlah Pekerjaan Struktur 7.164
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 376.759 3.297
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 753.518 2.499
3 Pek. Acian m2 608.988 1.287
4 Pek. Acian Kolom m2 92.160 0.174
5 Pek. Acian Listplang Beton m2 15.000 0.028
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 144.780 1.270
Sub Jumlah Pekerjaan Dinding 8.555
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 7.000 0.641
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 2.000 0.183
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 5.000 0.458
4 Pek. Pemasangan Jendela Type J-1 Unit 9.000 0.757
5 Pek. Pemasangan Jendela Type J-2 Unit 12.000 0.891
6 Pek. Pemasangan Jendela Type J-3 Unit 1.000 0.049
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.042
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 2.000 0.027
9 Pek. Pas. Railling Tangga m' 11.050 0.109
Sub Jumlah Pekerjaan Jendela dan Pintu 3.158
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 16.945 0.075
2 Pek. Lantai Granite 60x60 polos m2 274.500 3.736
3 Pek. Keramik Lantai 40x40 warna muda m2 48.000 0.395
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 171.600 1.274
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 22.000 0.168
6 Pek. Pemasangan Step nozing Tangga m! 15.000 0.027
7 Pek. Pemasangan Paving Blok Natural t=8 m2 38.400 0.329
8 Pek. Pemasangan waterproofing m2 22.000 0.062
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
Sub Jumlah Pekerjaan Lantai 6.066
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 160.890 0.987
2 Pek. Pasang Nok Metalroof m' 9.330 0.036
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 14.670 0.041
4 Pek. Pasang Lisplang Woodplang 20 cm m' 59.000 0.190
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 339.970 0.913
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 339.970 1.265
7 Pek. Jurai Talang m2 9.000 0.038
8 Pek. Flasing m2 26.100 0.101
Sub Jumlah Pekerjaan Atap dan Plafond 3.572
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 418.590 0.458
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 247.590 0.306
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vi m2 350.000 0.326
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 35.000 0.043
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.133
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto Unit 3.000 0.489
2 Pek. Pemasangan Kloset Jongkok Unit 2.000 0.078
3 Pek. Pemasangan wastafle ex. Toto Unit 4.000 0.546
4 Pek. Pemasangan Urinoir ex.Toto Unit 3.000 0.423
5 Pek. Pemasangan Floor Drain Unit 8.000 0.109
6 Pek. Pemasangan Jet Washer Toto Unit 3.000 0.033
7 Pek. Pemasangan Kran ai dia 1/2 Unit 8.000 0.026
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 3.000 0.163
9 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.455
10 Pek. Pemasangan Torn 1000 liter Unit 2.000 0.148
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 26.600 0.027
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 70.000 0.081
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 28.500 0.193
14 Pek. Pemasangan Stop Kran Unit 2.000 0.010
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 15.000 0.038
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 28.000 0.109
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 1.000 0.126
Sub Jumlah Pekerjaan Sanitair 3.057
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 6.000 0.134
3 Pek. Pemasangan Antena TV Titik 1.000 0.007
4 Pek. Grounding Unit 1.000 0.020
5 Pek. Pemasangan Smoke Detector -
- Smoke Detector Unit 7.000 0.061
- Heat Detector Unit 2.000 0.007
- Bel Alarm Unit 1.000 0.007
- Break Glass Unit 1.000 0.006
- Hambatan Tepi Unit 2.000 0.005
- CTBFA Unit 1.000 0.171
6 Pek. Instalasi CCTV -
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 1.000 0.445
7 Pek. Pasang Alarm Unit 1.000 0.074
8 Pek. Pasang Pesawat Tlp Panasonic Unit 4.000 0.079
9 Pek. Test Comisioning Unit 1.000 0.012
Sub Jumlah Pekerjaan Mekanikal 1.030
C. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049
2 Pek. Pemasangan MCB 10A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 7.000 0.019
4 Pek. Pemasangan MCB 3 X 10 A unit 2.000 0.025
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 44.000 0.265
6 Pek. Pemasangan lampu RMI 1x36 cm Set 3.000 0.047
7 Pek. Pemasangan lampu RMI 2x36 cm Set 9.000 0.174
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 24.000 0.126
9 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 13.000 0.013
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 5.000 0.006
12 Pek. Pemasangan instalasi Stop Kontak titik 18.000 0.163
13 Pek. Pemasangan Instalasi Antena TV Titik 4.000 0.030
14 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
15 Pek. Instalasi CCTV titk 6.000 0.045
16 Pek. Instalasi Telepon titik 4.000 0.035
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 40.000 0.085
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 40.000 0.085
19 Pek. Pemasangan lampu dinding buah 2.000 0.025
20 Pek. Pemasangan Instalasi saklar Hotel buah 2.000 0.005
Sub Jumlah Pekerjaan Elektrikal 1.277
B. BAGIAN KONTRAK II BANGUNAN DEPAN
PEKERJAAN STRUKTUR
a. Pekerjaan Galian dan Urugan
1 Pek. Pembersihan Lapangan dan Perataan Ls 1.000 0.001
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 102.400 0.460
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 376.834 2.104
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 10.000 0.055
5 Pek. Urugan Tanah Kembali m3 33.720 0.050
Sub Jumlah Pekerjaan Galian dan Urugan 2.670
b. Pekerjaan Struktur
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 16.090 0.563
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 36.000 0.036
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 12.000 1.906
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 2.000 0.130
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 6.000 0.985
6 Pek. Sloof 40x20, K300 (TB1) m3 11.520 2.167
7 Pek. Kolom Pedestal 30x30 (K1) m3 6.340 1.698
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
8 Pek. Kolom Pedestal 25x25 (K2) m3 4.600 1.330
9 Pek. Kolom 15 x 15 Cm m3 3.780 0.875
10 Pek. Sloof 40x20, K300 (TB2) m3 0.320 0.053
11 Pek. Ring Balk 1 15x40 (RB1) m3 8.910 1.865
12 Pek. B1 (Balok) m3 13.520 3.181
13 Pek. B3 (Balok) m3 3.200 0.710
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 26.100 7.213
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 250.000 3.208
16 Pek. Tangga t=18cm l=30cm p=90cm m3 7.530 1.813
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 1.553 0.323
18 Pek. Topian Beton berulang T = 10 cm m3 2.378 0.630
Sub Jumlah Pekerjaan Struktur 28.684
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 497.110 4.350
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 994.210 3.297
3 Pek. Acian m2 994.210 2.101
4 Pek. Acian Kolom m2 181.040 0.341
5 Pek. Acian Listplang Beton m2 15.000 0.028
6 Pek. Keramik dinding 25x40 warna muda m2 38.500 0.338
Sub Jumlah Pekerjaan Dinding 10.456
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 1.000 0.396
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 2.000 0.178
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 1.000 0.129
4 Pek. Pemasangan Kaca Tempered 12mm m2 9.900 0.417
5 Pek. Pemasangan Jendela type J-2 unit 18.000 1.336
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 3.000 0.048
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 1.000 0.016
8 Pek. Pas. Railling Tangga m' 12.480 0.154
9 Pek. Pas. Railling Tangga m' 12.480 0.124
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
Sub Jumlah Pekerjaan Jendela dan Pintu 2.798 -
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 11.250 0.050
2 Pek. Lantai Granite 60x60 polos m2 202.500 2.758
3 Pek. Keramik Lantai 40x40 warna muda m2 30.000 0.279
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 132.300 0.986
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m' 57.250 0.827
7 Pek. Floor Hardener m2 230.200 0.855
9 Pek. Pemasangan Paving Blok Natural t=8 m' 129.700 1.111
11 Pek. Pemasangan waterproofing m2 15.000 0.042
Sub Jumlah Pekerjaan Lantai 6.908 -
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 354.480 2.456
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 354.480 2.176
3 Pek. Pasang Nok Metalroof m' 39.000 0.151
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 13.000 0.036
5 Pek. Pasang Lisplang Woodplang 20 cm m' 68.000 0.185
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 286.060 0.769
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 279.280 1.040
9 Pek Talang Datar m2 9.000 0.038
Sub Jumlah Pekerjaan Atap dan Plafond 6.850
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 445.420 0.487
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 305.900 0.424
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) Vi m2 460.000 0.428
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) m2 60.000 0.074
Sub Jumlah Pekerjaan Pengecatan dan Laburan 1.413 -
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 1.000 0.163
3 Pek. Pemasangan wastafle ex. Toto Unit 1.000 0.137
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
5 Pek. Pemasangan Floor Drain Unit 1.000 0.014
6 Pek. Pemasangan Jet Washer Toto Unit 1.000 0.011
7 Pek. Pemasangan Kran ai dia 1/2 Unit 1.000 0.003
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 4.000 0.004
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 58.000 0.067
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 10.000 0.039
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 10.000 0.068
13 Pek. Pemasangan Stop Kran Unit 1.000 0.005
14 Pek. Pemasangan Biofil 1000 liter Unit 1.000 0.199
Sub Jumlah Pekerjaan Sanitair 0.709
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 3.000 0.067
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 2.000 0.017
5 Pek. Instalasi SDP + Accessories bh 1.000 0.012
6 Pek. Pemasangan Box KWH meter bh 1.000 0.012
7 Pek. SDP AC bh 1.000 0.012
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 2.000 0.089
9 Pek. Pilot Lamp buah 3.000 0.002
10 Pek. Fuse Pilot Lamp buah 3.000 0.001
11 Pek. Selector Switch buah 1.000 0.008
12 Pek. Amper Meter buah 3.000 0.029
13 Pek. Volt Meter buah 1.000 0.010
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 2.000 0.025
Sub Jumlah Pekerjaan Mekanikal 0.286
c. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 2.000 0.049
2 Pek. Pemasangan MCB 10 A Unit 4.000 0.011
3 Pek. Pemasangan MCB 6A Unit 10.000 0.027
4 Pek. Pemasangan MCB 3 X 10A Unit 7.000 0.086
5 Pek. Pemasangan MCB 35 A Unit 1.000 0.013
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 50.000 0.301
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
7 Pek. Pemasangan lampu RMI 1x36 cm Set 9.000 0.141
8 Pek. Pemasangan lampu RMI 2x36 cm Set 10.000 0.193
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 21.000 0.110
10 Pek. Pemasangan lampu 15 watt Unit 8.000 0.034
13 Pek. Pemasangan Lampu Taman Lengkap Unit 2.000 0.049
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 6.000 0.007
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 6.000 0.006
16 Pek. Pemasangan instalasi Stop Kontak titik 12.000 0.015
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 2.000 0.015
19 Pek. Pemasangan Instalasi stop kontak AC Unit 4.000 0.038
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 50.000 0.373
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 16.000 0.034
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 16.000 0.034
Sub Jumlah Pekerjaan Elektrikal 1.537
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 30.000 0.206
b. Pekerjaan Bak Kontrol buah 7.000 0.044
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 15.000 0.089
d. Pekerjaan Jalan Beton L 1.2 m m2 30.000 0.177
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 1.000 0.210
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 1.000 0.449
g. Pekerjaan Foyer -
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 22.100 0.152
o. Plesteran 1 : 6 Tebal 15 mm m2 33.150 0.110
o. Acian m2 33.150 0.070
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup) vin m2 33.150 0.030
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2.000 0.243
1.779
ADDENDUM KONTRAK VOLUME PEKERJAAN
1 2 3 4 5 6 7 8
Bandung, 12 Desember 2016
Panitia Pemeriksa Hasil Pekerjaan
LAMPIRAN DAFTAR VOL PELAKSANAAN PEKERJAAN
Kegiatan : PENINGKATAN KUALITAS SARANA, PRASARANA DAN UTILITAS
Pekerjaan : PEMBANGUNAN KANTOR BALAI PENGELOLAAN DAN PELAYANAN PERUMAHAN JAWA BARAT (BP3JB)
Tahun Anggaran : 2016
Lokasi : Pasir Impun Kota Bandung
ADDENDUM
1 2 3 5.00 4
I. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 150,000.00 1.000
2 Pek. Alat Bantu Scoppolding/bambu Ls 7,500,000.00 1.000
3 Mobilisasi dan Demobilisasi Ls 2,500,000.00 1.000
4 Listrik dan Air Kerja Ls 3,000,000.00 1.000
5 Administrasi, Dokumentasi, dan Pelaporan Ls 5,000,000.00 1.000
SUB JUMLAH PEKERJAAN PERSIAPAN
II. PEKERJAAN KONSTRUKSI
A. BAGIAN KONTRAK I BANGUNAN BELAKANG
PEKERJAAN STRUKTUR
b. Pekerjaan Struktur
1 Pek. Kolom 15 x 15 Cm m3 4,675,521.78 4.111
2 Pek. Balok lintel 15 x 15 Cm m3 4,197,188.44 1.744
3 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) (Atap Belakang&Foyer) m3 5,583,248.32 15.536
4 Pek. Pemasangan waterproofing m2 56,900.00 136.400
5 Pek. Topi Beton T= 10 cm m3 5,349,551.88 1.873
6 Pek. Balok Beton 15 x 40 cm m3 4,228,131.00 2.268
ADDENDUM
1 2 3 5.00 4
7 Pek. Balok Beton 15 x 25 cm m3 3,306,544.00 1.238
Sub Jumlah Pekerjaan Struktur
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 176,800.00 376.759
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 67,000.00 753.518
3 Pek. Acian m2 42,700.00 608.988
4 Pek. Acian Kolom m2 38,100.00 92.160
5 Pek. Acian Listplang Beton m2 38,100.00 15.000
6 Pek. Pasang dinding keramik warna muda Uk. 25 X 40Cm m2 177,200.00 144.780
Sub Jumlah Pekerjaan Dinding
ADDENDUM
1 2 3 5.00 4
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-2) Unit 1,850,000.00 7.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-3) Unit 1,850,000.00 2.000
3 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-4) Unit 1,850,000.00 5.000
4 Pek. Pemasangan Jendela Type J-1 Unit 1,700,000.00 9.000
5 Pek. Pemasangan Jendela Type J-2 Unit 1,500,000.00 12.000
6 Pek. Pemasangan Jendela Type J-3 Unit 1,000,000.00 1.000
7 Pek. Bouvenli Alumunium 4" (BV-1) Unit 280,000.00 3.000
8 Pek. Bouvenli Alumunium 4" (BV-2) Unit 275,000.00 2.000
9 Pek. Pas. Railling Tangga m' 200,000.00 11.050
Sub Jumlah Pekerjaan Jendela dan Pintu
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 89,100.00 16.945
2 Pek. Lantai Granite 60x60 polos m2 275,000.00 274.500
3 Pek. Keramik Lantai 40x40 warna muda m2 166,200.00 48.000
4 Pek. Pemasangan Plint Granite Uk.15x60 m' 150,000.00 171.600
5 Pek. Keramik lantai Anti Slip Uk.30x60 m2 153,870.00 22.000
6 Pek. Pemasangan Step nozing Tangga m! 36,580.00 15.000
7 Pek. Pemasangan Paving Blok Natural t=8 m2 173,100.00 38.400
8 Pek. Pemasangan waterproofing m2 56,900.00 22.000
Sub Jumlah Pekerjaan Lantai
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Atap Metalroof 0.35 Pasir m2 124,000.00 160.890
2 Pek. Pasang Nok Metalroof m' 78,300.00 9.330
3 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 56,270.00 14.670
ADDENDUM
1 2 3 5.00 4
4 Pek. Pasang Lisplang Woodplang 20 cm m' 65,000.00 59.000
5 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 54,280.00 339.970
6 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 75,200.00 339.970
7 Pek. Jurai Talang m2 84,790.00 9.000
8 Pek. Flasing m2 78,300.00 26.100
Sub Jumlah Pekerjaan Atap dan Plafond
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 22,100.00 418.590
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 25,000.00 247.590
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 18,800.00 350.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 25,000.00 35.000
Sub Jumlah Pekerjaan Pengecatan dan Laburan
ADDENDUM
1 2 3 5.00 4
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto Unit 3,290,800.00 3.000
2 Pek. Pemasangan Kloset Jongkok Unit 792,700.00 2.000
3 Pek. Pemasangan wastafle ex. Toto Unit 2,760,100.00 4.000
4 Pek. Pemasangan Urinoir ex.Toto Unit 2,847,600.00 3.000
5 Pek. Pemasangan Floor Drain Unit 276,500.00 8.000
6 Pek. Pemasangan Jet Washer Toto Unit 225,100.00 3.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 64,700.00 8.000
8 Pek. Pemasangan penyekat ruang urinoir toto Unit 1,100,000.00 3.000
9 Pek. Pemasangan Biofil 1000 liter Unit 9,200,000.00 1.000
10 Pek. Pemasangan Torn 1000 liter Unit 1,500,000.00 2.000
11 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 20,500.00 26.600
12 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 23,500.00 70.000
13 Pek. Pemasangan Pipa PVC AW dia 4" m' 137,100.00 28.500
14 Pek. Pemasangan Stop Kran Unit 100,000.00 2.000
15 Pek. Pemasangan Pipa PVC AW dia 2" m! 50,660.00 15.000
16 Pek. Pemasangan Pipa PVC AW dia 3" m! 78,710.00 28.000
17 Pek. Pembuatan Sumur Resapan DN 80 Cm unit 2,546,391.43 1.000
Sub Jumlah Pekerjaan Sanitair
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 450,000.00 6.000
3 Pek. Pemasangan Antena TV Titik 150,000.00 1.000
4 Pek. Grounding Unit 408,200.00 1.000
5 Pek. Pemasangan Smoke Detector
ADDENDUM
1 2 3 5.00 4
- Smoke Detector Unit 175,000.00 7.000
- Heat Detector Unit 75,000.00 2.000
- Bel Alarm Unit 150,000.00 1.000
- Break Glass Unit 125,000.00 1.000
- Hambatan Tepi Unit 50,000.00 2.000
- CTBFA Unit 3,450,000.00 1.000
6 Pek. Instalasi CCTV
- Outdoor(2Unit), indor (4Unit), DVR Kpd 677, HD 500Gb, kap 8 Kamera) set 9,000,000.00 1.000
7 Pek. Pasang Alarm Unit 1,500,000.00 1.000
8 Pek. Pasang Pesawat Tlp Panasonic Unit 400,000.00 4.000
9 Pek. Test Comisioning Unit 250,000.00 1.000
Sub Jumlah Pekerjaan Mekanikal
ADDENDUM
1 2 3 5.00 4
C. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 500,000.00 2.000
2 Pek. Pemasangan MCB 10A Unit 55,000.00 4.000
3 Pek. Pemasangan MCB 6A Unit 55,000.00 7.000
4 Pek. Pemasangan MCB 3 X 10 A unit 247,500.00 2.000
5 Pek. Pemasangan instalasi Penerangan Titik lampu titik 121,600.00 44.000
6 Pek. Pemasangan lampu RMI 1x36 cm Set 316,300.00 3.000
7 Pek. Pemasangan lampu RMI 2x36 cm Set 390,700.00 9.000
8 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 106,000.00 24.000
9 Pek. Pemasangan lampu 15 watt Unit 85,000.00 8.000
10 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 20,000.00 13.000
11 Pek. Pemasangan Instalasi saklar double ex.broco Unit 23,600.00 5.000
12 Pek. Pemasangan instalasi Stop Kontak titik 182,800.00 18.000
13 Pek. Pemasangan Instalasi Antena TV Titik 150,000.00 4.000
14 Pek. Pemasangan Instalasi stop kontak AC Unit 192,500.00 4.000
15 Pek. Instalasi CCTV titk 150,000.00 6.000
16 Pek. Instalasi Telepon titik 175,000.00 4.000
17 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 Lampu dan Stop Kontak m! 42,740.00 40.000
18 Pek. Pemasangan Kabel dari PP-LT 1 4 x 6 AC m! 42,740.00 40.000
19 Pek. Pemasangan lampu dinding buah 250,000.00 2.000
20 Pek. Pemasangan Instalasi saklar Hotel buah 55,000.00 2.000
Sub Jumlah Pekerjaan Elektrikal
B. BAGIAN KONTRAK II BANGUNAN DEPAN
PEKERJAAN STRUKTUR
a. Pekerjaan Galian dan Urugan
ADDENDUM
1 2 3 5.00 4
1 Pek. Pembersihan Lapangan dan Perataan Ls 18,200.00 1.000
2 Pek. Galian Tanah Biasa Max. Kedalaman 1 m (Untuk Pondasi) m3 90,700.00 102.400
3 Pek. Galian Tanah dengan alat berat (penurunan level bangunan) Dengan buangan m3 112,800.00 376.834
4 Pek. Galian Tanah Maksimal Kedalaman 2m (Untuk Biofill) m3 110,800.00 10.000
5 Pek. Urugan Tanah Kembali m3 30,200.00 33.720
Sub Jumlah Pekerjaan Galian dan Urugan
ADDENDUM
1 2 3 5.00 4
b. Pekerjaan Struktur
1 Pek. Pondasi Batu Kali U/ Penahan Tanah m3 707,407.50 16.090
2 Pek. Pemasangan sulingan air pipa PVC dia 2" titik 20,000.00 36.000
3 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P1) Bh 3,208,672.70 12.000
4 Pek. Pondasi Telapak 120 x 120 Cm Beton K-300 (P2) Bh 1,309,790.62 2.000
5 Pek. Pondasi Telapak 200 x 200 Cm Beton K-300 (P3) Bh 3,317,598.85 6.000
6 Pek. Sloof 40x20, K300 (TB1) m3 3,800,163.00 11.520
7 Pek. Kolom Pedestal 30x30 (K1) m3 5,411,578.83 6.340
8 Pek. Kolom Pedestal 25x25 (K2) m3 5,843,688.96 4.600
9 Pek. Kolom 15 x 15 Cm m3 4,675,521.78 3.780
10 Pek. Sloof 40x20, K300 (TB2) m3 3,337,414.50 0.320
11 Pek. Ring Balk 1 15x40 (RB1) m3 4,228,131.00 8.910
12 Pek. B1 (Balok) m3 4,753,552.69 13.520
13 Pek. B3 (Balok) m3 4,481,865.56 3.200
14 Pek. Plat Lantai (1), T=12 Cm (Beton K-225) m3 5,583,248.32 26.100
15 Pek. Lantai Basement T=15Cm (Beton K-300) m2 259,237.55 250.000
16 Pek. Tangga t=18cm l=30cm p=90cm m3 4,864,400.00 7.530
17 Pek. Pasang Balok lintel 15 x 15 Cm m3 4,197,188.44 1.553
18 Pek. Topian Beton berulang T = 10 cm m3 5,349,551.88 2.378
Sub Jumlah Pekerjaan Struktur
PEKERJAAN ARSITEKTUR
a. Pekerjaan Dinding
1 Pek. Pemasangan Dinding Bata 1 PC : 6 PP m2 176,800.00 497.110
2 Pek. Plesteran 1 : 6 Tebal 15 mm m2 67,000.00 994.210
3 Pek. Acian m2 42,700.00 994.210
ADDENDUM
1 2 3 5.00 4
4 Pek. Acian Kolom m2 38,100.00 181.040
5 Pek. Acian Listplang Beton m2 38,100.00 15.000
6 Pek. Keramik dinding 25x40 warna muda m2 177,200.00 38.500
Sub Jumlah Pekerjaan Dinding
b. Pekerjaan Jendela dan Pintu
1 Pek. Pemasangan Kusen Kaca Tipe P.K.1. (Pintu Kaca) Entrance (PJ1) Unit 8,000,000.00 1.000
2 Pek. Pemasanagan Daun Pintu Teakwood Uk.80x260 Finishing Melamik (P-1) Unit 1,800,000.00 2.000
3 Pek. Pemasanagan Daun Pintu Double Teakwood Uk.130x260 Finishing Melamik (P-6) Unit 2,600,000.00 1.000
4 Pek. Pemasangan Kaca Tempered 12mm m2 850,000.00 9.900
5 Pek. Pemasangan Jendela type J-2 unit 1,500,000.00 18.000
6 Pek. Bouvenli Alumunium 4" (BV-1) Unit 325,000.00 3.000
7 Pek. Bouvenli Alumunium 4" (BV-2) Unit 325,000.00 1.000
8 Pek. Pas. Railling Tangga m' 250,000.00 12.480
9 Pek. Pas. Railling Tangga m' 200,000.00 12.480
Sub Jumlah Pekerjaan Jendela dan Pintu
ADDENDUM
1 2 3 5.00 4
c. Pekerjaan Lantai
1 Pek. Urugan Pasir Urug m3 89,100.00 11.250
2 Pek. Lantai Granite 60x60 polos m2 275,200.00 202.500
3 Pek. Keramik Lantai 40x40 warna muda m2 188,000.00 30.000
5 Pek. Pemasangan Plint Granite Uk.15x60 m' 150,600.00 132.300
6 Pek. Pemasangan lantai granite tangga (nozing step) 30 x 60 m2 291,700.00 57.250
7 Pek. Floor Hardener m2 75,000.00 230.200
9 Pek. Pemasangan Paving Blok Natural t=8 m' 173,100.00 129.700
11 Pek. Pemasangan waterproofing m2 56,900.00 15.000
Sub Jumlah Pekerjaan Lantai
d. Pekerjaan Atap dan Plafond
1 Pek. Pasang Rangka Atap Baja Ringan m2 140,000.00 354.480
2 Pek. Pasang Atap Metalroof 0.35 Pasir m2 124,000.00 354.480
3 Pek. Pasang Nok Metalroof m' 78,300.00 39.000
4 Pek. Pasang Nok Metalroof (Tambahan Pada Harga Timpang) m' 56,270.00 13.000
5 Pek. Pasang Lisplang Woodplang 20 cm m' 55,000.00 68.000
7 Pek. Pemasangan langit-lagit Gypsum Ex DN m2 54,280.00 286.060
8 Pek. Pemasangan Rangka besi hollow 1x40x40x2mm, modul 60x60 m2 75,200.00 279.280
9 Pek Talang Datar m2 84,790.00 9.000
Sub Jumlah Pekerjaan Atap dan Plafond
e. Pekerjaan Pengecatan dan Laburan
1 Pek. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 22,100.00 445.420
2 Pek. Pengecatan Tembok Baru Eksterior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 28,000.00 305.900
3 Pek. Pengecatan Tembok Baru Plafond (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutu m2 18,800.00 460.000
4 Pek. Pengecatan Tembok Baru Listplang (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penu m2 25,000.00 60.000
ADDENDUM
1 2 3 5.00 4
Sub Jumlah Pekerjaan Pengecatan dan Laburan
PEKERJAAN MEKANIKAL & ELEKTRIKAL
a. Pekerjaan Sanitair
1 Pek. Pemasangan Kloset Duduk Toto J421 Unit 3,290,800.00 1.000
3 Pek. Pemasangan wastafle ex. Toto Unit 2,760,100.00 1.000
5 Pek. Pemasangan Floor Drain Unit 276,500.00 1.000
6 Pek. Pemasangan Jet Washer Toto Unit 225,100.00 1.000
7 Pek. Pemasangan Kran ai dia 1/2 Unit 64,700.00 1.000
9 Pek. Pemasangan Pipa PVC AW dia 1/2" m' 20,500.00 4.000
10 Pek. Pemasangan Pipa PVC AW dia 3/4" m' 23,500.00 58.000
11 Pek. Pemasangan Pipa PVC AW dia 3" m! 78,710.00 10.000
12 Pek. Pemasangan Pipa PVC AW dia 4" m' 137,100.00 10.000
13 Pek. Pemasangan Stop Kran Unit 100,000.00 1.000
14 Pek. Pemasangan Biofil 1000 liter Unit 4,012,500.00 1.000
Sub Jumlah Pekerjaan Sanitair
ADDENDUM
1 2 3 5.00 4
b. Pekerjaan Mekanikal
1 Pek. Pemasangan Exhaus Fan Unit 450,000.00 3.000
4 Pek. Instalasi Pesawat Tlp Pnasonic bh 175,000.00 2.000
5 Pek. Instalasi SDP + Accessories bh 250,000.00 1.000
6 Pek. Pemasangan Box KWH meter bh 250,000.00 1.000
7 Pek. SDP AC bh 250,000.00 1.000
8 Pek. Box Panel 60x50x20Cm Tebal Plat 1.8mm finishing Cat bh 900,000.00 2.000
9 Pek. Pilot Lamp buah 15,000.00 3.000
10 Pek. Fuse Pilot Lamp buah 8,550.00 3.000
11 Pek. Selector Switch buah 157,500.00 1.000
12 Pek. Amper Meter buah 193,500.00 3.000
13 Pek. Volt Meter buah 211,500.00 1.000
14 Pek. Pasang SDP Lampu dan Stop Kontak Basement bh 250,000.00 2.000
Sub Jumlah Pekerjaan Mekanikal
c. Pekerjaan Elektrikal
1 Pek. Pemasangan Box Panel Unit 500,000.00 2.000
2 Pek. Pemasangan MCB 10 A Unit 55,000.00 4.000
3 Pek. Pemasangan MCB 6A Unit 55,000.00 10.000
4 Pek. Pemasangan MCB 3 X 10A Unit 247,500.00 7.000
5 Pek. Pemasangan MCB 35 A Unit 270,000.00 1.000
6 Pek. Pemasangan instalasi Penerangan Titik lampu titik 121,600.00 50.000
7 Pek. Pemasangan lampu RMI 1x36 cm Set 316,300.00 9.000
8 Pek. Pemasangan lampu RMI 2x36 cm Set 390,700.00 10.000
9 Pek. Pemasangan lampu downlight Lengkap + Lampu Unit 106,000.00 21.000
10 Pek. Pemasangan lampu 15 watt Unit 85,000.00 8.000
ADDENDUM
1 2 3 5.00 4
13 Pek. Pemasangan Lampu Taman Lengkap Unit 500,000.00 2.000
14 Pek. Pemasangan Instalasi saklar double ex.broco Unit 23,600.00 6.000
15 Pek. Pemasangan Instalasi saklar tunggal ex.broco Unit 20,000.00 6.000
16 Pek. Pemasangan instalasi Stop Kontak titik 26,000.00 12.000
17 Pek Pemasangan instalasi Stop Kontak
18 Pek. Pemasangan Antena TV Titik 150,000.00 2.000
19 Pek. Pemasangan Instalasi stop kontak AC Unit 192,500.00 4.000
20 Pek. Pemasangan Kabel dari KWH ke MDP NYGBY 4 x 16 m! 150,600.00 50.000
21 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 Lampu dan Stop Kontak m! 42,740.00 16.000
22 Pek. Pemasangan Kabel dari PP-LT 2 4 x 6 AC m! 42,740.00 16.000
Sub Jumlah Pekerjaan Elektrikal
ADDENDUM
1 2 3 5.00 4
3. POS SATPAM & GROUNDTANK
h. Pekerjaan Pelengkap
a. Pekerjaan Saluran Grevel U 20 cm m! 138,493.94 30.000
b. Pekerjaan Bak Kontrol buah 127,058.00 7.000
c. Pekerjaan Saluran Buis Beton DN 20 Cm m! 119,518.51 15.000
d. Pekerjaan Jalan Beton L 1.2 m m2 118,925.00 30.000
e. Pek. Pengadaan Dan Pemasangan Reservoir 2 m3 unit 4,252,740.00 1.000
f. Pek. Pompa Transfer 500 watt PH 268 JP + Instalasi + R.Pompa unit 9,072,825.00 1.000
g. Pekerjaan Foyer
o. Pemasangan Dinding Bata 1 PC : 6 PP m2 139,120.00 22.100
o. Plesteran 1 : 6 Tebal 15 mm m2 67,000.00 33.150
o. Acian m2 42,700.00 33.150
o. Pengecatan Tembok Baru Interior (1lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup m2 18,120.00 33.150
o. Pemasangan Kusen Pintu/Jendela Alumunium Unit 2,454,550.00 2.000
J U M LAH
Dibulatkan ke bawah ( dalam ribuan )
P P N 10 % ( dibulatkan ke atas dalam ribuan )
T O T A L
ADDENDUM
1 2 3 5.00 4
Mengetahui :
Pejabat Pelaksana Teknis Kegiatan Ko
Peningkatan Kualitas Prasarana, Sarana, dan Utilitas Rusunawa PT
6 7 8 9 10 11 12 13
6 7 8 9 10 11 12 13
4,091,848.20 0.203 1.238 4,091,848.200 0.203 - - -
144,739,539.68 7.164 - 136,978,379.674 6.780 ### 0.384
- -
- -
66,610,991.20 3.297 376.759 66,610,991.200 3.297 - - -
50,485,706.00 2.499 753.518 50,485,706.000 2.499 - - -
26,003,787.60 1.287 608.988 26,003,787.600 1.287 - - -
3,511,296.00 0.174 92.160 3,511,296.000 0.174 - - -
571,500.00 0.028 15.000 571,500.000 0.028 - - -
25,655,016.00 1.270 144.780 25,655,016.000 1.270 - - -
172,838,296.80 8.555 - 172,838,296.800 8.555 - -
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
- -
12,950,000.00 0.641 7.000 12,950,000.000 0.641 - - -
3,700,000.00 0.183 2.000 3,700,000.000 0.183 - - -
9,250,000.00 0.458 5.000 9,250,000.000 0.458 - - -
15,300,000.00 0.757 9.000 15,300,000.000 0.757 - - -
18,000,000.00 0.891 12.000 18,000,000.000 0.891 - - -
1,000,000.00 0.049 1.000 1,000,000.000 0.049 - - -
840,000.00 0.042 3.000 840,000.000 0.042 - - -
550,000.00 0.027 2.000 550,000.000 0.027 - - -
2,210,000.00 0.109 - - - 11.050 2,210,000.000 0.109
63,800,000.00 3.158 - 61,590,000.000 3.048 ### 0.109
- -
1,509,799.50 0.075 16.945 1,509,799.500 0.075 - - -
75,487,500.00 3.736 274.500 75,487,500.000 3.736 - - -
7,977,600.00 0.395 48.000 7,977,600.000 0.395 - - -
25,740,000.00 1.274 171.600 25,740,000.000 1.274 - - -
3,385,140.00 0.168 - - - 22.000 3,385,140.000 0.168
548,700.00 0.027 - - - 15.000 548,700.000 0.027
6,647,040.00 0.329 - - - 38.400 6,647,040.000 0.329
1,251,800.00 0.062 - - - 22.000 1,251,800.000 0.062
122,547,579.50 6.066 - 110,714,899.500 5.480 ### 0.586
- -
19,950,360.00 0.987 160.890 19,950,360.000 0.987 - - -
730,539.00 0.036 9.330 730,539.000 0.036 - - -
825,480.90 0.041 14.670 825,480.900 0.041 - - -
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
3,835,000.00 0.190 59.000 3,835,000.000 0.190 - - -
18,453,571.60 0.913 339.970 18,453,571.600 0.913 - - -
25,565,744.00 1.265 339.970 25,565,744.000 1.265 - - -
763,110.00 0.038 9.000 763,110.000 0.038 - - -
2,043,630.00 0.101 26.100 2,043,630.000 0.101 - - -
72,167,435.50 3.572 - 72,167,435.500 3.572 - -
- -
9,250,839.00 0.458 418.590 9,250,839.000 0.458 - - -
6,189,750.00 0.306 - - - 247.590 6,189,750.000 0.306
6,580,000.00 0.326 350.000 6,580,000.000 0.326 - - -
875,000.00 0.043 35.000 875,000.000 0.043 - - -
22,895,589.00 1.133 - 16,705,839.000 0.827 ### 0.306
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
- -
- -
9,872,400.00 0.489 3.000 9,872,400.000 0.489 - - -
1,585,400.00 0.078 2.000 1,585,400.000 0.078 - - -
11,040,400.00 0.546 4.000 11,040,400.000 0.546 - - -
8,542,800.00 0.423 3.000 8,542,800.000 0.423 - - -
2,212,000.00 0.109 8.000 2,212,000.000 0.109 - - -
675,300.00 0.033 3.000 675,300.000 0.033 - - -
517,600.00 0.026 8.000 517,600.000 0.026 - - -
3,300,000.00 0.163 2.000 2,200,000.000 0.109 1.000 1,100,000.000 0.054
9,200,000.00 0.455 1.000 9,200,000.000 0.455 - - -
3,000,000.00 0.148 2.000 3,000,000.000 0.148 - - -
545,300.00 0.027 26.600 545,300.000 0.027 - - -
1,645,000.00 0.081 70.000 1,645,000.000 0.081 - - -
3,907,350.00 0.193 28.500 3,907,350.000 0.193 - - -
200,000.00 0.010 2.000 200,000.000 0.010 - - -
759,900.00 0.038 15.000 759,900.000 0.038 - - -
2,203,880.00 0.109 28.000 2,203,880.000 0.109 - - -
2,546,391.43 0.126 1.000 2,546,391.430 0.126 - - -
61,753,721.43 3.057 - 60,653,721.430 3.002 ### 0.054
- -
2,700,000.00 0.134 6.000 2,700,000.000 0.134 - - -
150,000.00 0.007 - - - 1.000 150,000.000 0.007
408,200.00 0.020 1.000 408,200.000 0.020 - - -
- - - - - - -
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
1,225,000.00 0.061 - - - 7.000 1,225,000.000 0.061
150,000.00 0.007 - - - 2.000 150,000.000 0.007
150,000.00 0.007 - - - 1.000 150,000.000 0.007
125,000.00 0.006 - - - 1.000 125,000.000 0.006
100,000.00 0.005 - - - 2.000 100,000.000 0.005
3,450,000.00 0.171 - - - 1.000 3,450,000.000 0.171
- - - - - - -
9,000,000.00 0.445 - - - 1.000 9,000,000.000 0.445
1,500,000.00 0.074 - - - 1.000 1,500,000.000 0.074
1,600,000.00 0.079 - - - 4.000 1,600,000.000 0.079
250,000.00 0.012 - - - 1.000 250,000.000 0.012
20,808,200.00 1.030 - 3,108,200.000 0.154 ### 0.876
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
- -
1,000,000.00 0.049 2.000 1,000,000.000 0.049 - - -
220,000.00 0.011 4.000 220,000.000 0.011 - - -
385,000.00 0.019 7.000 385,000.000 0.019 - - -
495,000.00 0.025 2.000 495,000.000 0.025 - - -
5,350,400.00 0.265 44.000 5,350,400.000 0.265 - - -
948,900.00 0.047 - - - 3.000 948,900.000 0.047
3,516,300.00 0.174 8.000 3,125,600.000 0.155 1.000 390,700.000 0.019
2,544,000.00 0.126 24.000 2,544,000.000 0.126 - - -
680,000.00 0.034 - - - 8.000 680,000.000 0.034
260,000.00 0.013 13.000 260,000.000 0.013 - - -
118,000.00 0.006 5.000 118,000.000 0.006 - - -
3,290,400.00 0.163 18.000 3,290,400.000 0.163 - - -
600,000.00 0.030 4.000 600,000.000 0.030 - - -
770,000.00 0.038 4.000 770,000.000 0.038 - - -
900,000.00 0.045 4.000 600,000.000 0.030 2.000 300,000.000 0.015
700,000.00 0.035 4.000 700,000.000 0.035 - - -
1,709,600.00 0.085 40.000 1,709,600.000 0.085 - - -
1,709,600.00 0.085 40.000 1,709,600.000 0.085 - - -
500,000.00 0.025 - - - 2.000 500,000.000 0.025
110,000.00 0.005 2.000 110,000.000 0.005 - - -
25,807,200.00 1.277 - 22,987,600.000 1.138 ### 0.140
- -
- -
- -
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
18,200.00 0.001 1.000 18,200.000 0.001 - - -
9,287,680.00 0.460 102.400 9,287,680.000 0.460 - - -
42,506,875.20 2.104 376.834 42,506,875.200 2.104 - - -
1,108,000.00 0.055 10.000 1,108,000.000 0.055 - - -
1,018,344.00 0.050 33.720 1,018,344.000 0.050 - - -
53,939,099.20 2.670 - 53,939,099.200 2.670 - -
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
- -
11,382,186.68 0.563 10.000 7,074,075.000 0.350 6.090 4,308,111.675 0.213
720,000.00 0.036 18.000 360,000.000 0.018 18.000 360,000.000 0.018
38,504,072.38 1.906 12.000 38,504,072.376 1.906 - - -
2,619,581.23 0.130 2.000 2,619,581.234 0.130 - - -
19,905,593.10 0.985 6.000 19,905,593.104 0.985 - - -
43,777,877.76 2.167 11.520 43,777,877.760 2.167 - - -
34,309,409.80 1.698 6.340 34,309,409.803 1.698 - - -
26,880,969.22 1.330 4.600 26,880,969.216 1.330 - - -
17,673,472.32 0.875 3.780 17,673,472.320 0.875 - - -
1,067,972.64 0.053 0.320 1,067,972.640 0.053 - - -
37,672,647.21 1.865 8.910 37,672,647.210 1.865 - - -
64,268,032.34 3.181 13.520 64,268,032.335 3.181 - - -
14,341,969.80 0.710 3.200 14,341,969.800 0.710 - - -
145,722,781.27 7.213 26.100 145,722,781.270 7.213 - - -
64,809,387.50 3.208 250.000 64,809,387.500 3.208 - - -
36,628,932.00 1.813 7.530 36,628,932.000 1.813 - - -
6,516,135.06 0.323 1.553 6,516,135.060 0.323 - - -
12,718,559.60 0.630 2.378 12,718,559.598 0.630 - - -
579,519,579.90 28.684 - 574,851,468.226 28.453 4,668,111.675 0.231
- -
- -
87,889,048.00 4.350 497.110 87,889,048.000 4.350 - - -
66,612,070.00 3.297 945.658 63,359,052.500 3.136 48.553 3,253,017.500 0.161
42,452,767.00 2.101 947.105 40,441,383.500 2.002 47.105 2,011,383.500 0.100
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
6,897,624.00 0.341 100.000 3,810,000.000 0.189 81.040 3,087,624.000 0.153
571,500.00 0.028 - - - 15.000 571,500.000 0.028
6,822,200.00 0.338 - - - 38.500 6,822,200.000 0.338
211,245,209.00 10.456 - 195,499,484.000 9.676 ### 0.779
- -
8,000,000.00 0.396 - - - 1.000 8,000,000.000 0.396
3,600,000.00 0.178 - - - 2.000 3,600,000.000 0.178
2,600,000.00 0.129 - - - 1.000 2,600,000.000 0.129
8,415,000.00 0.417 - - - 9.900 8,415,000.000 0.417
27,000,000.00 1.336 6.000 9,000,000.000 0.445 12.000 18,000,000.000 0.891
975,000.00 0.048 - - - 3.000 975,000.000 0.048
325,000.00 0.016 - - - 1.000 325,000.000 0.016
3,120,000.00 0.154 - - - 12.480 3,120,000.000 0.154
2,496,000.00 0.124 - - - 12.480 2,496,000.000 0.124
56,531,000.00 2.798 6.000 9,000,000.000 0.445 ### 2.353
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
- -
1,002,375.00 0.050 11.250 1,002,375.000 0.050 - - -
55,728,000.00 2.758 150.000 41,280,000.000 2.043 52.500 14,448,000.000 0.715
5,640,000.00 0.279 - - - 30.000 5,640,000.000 0.279
19,924,380.00 0.986 - - - 132.300 19,924,380.000 0.986
16,699,825.00 0.827 - - - 57.250 16,699,825.000 0.827
17,265,000.00 0.855 - - - 230.200 17,265,000.000 0.855
22,451,070.00 1.111 - - - 129.700 22,451,070.000 1.111
853,500.00 0.042 - - - 15.000 853,500.000 0.042
139,564,150.00 6.908 161.250 42,282,375.000 2.093 ### 4.815
- -
49,627,200.00 2.456 354.480 49,627,200.000 2.456 - - -
43,955,520.00 2.176 354.480 43,955,520.000 2.176 - - -
3,053,700.00 0.151 39.000 3,053,700.000 0.151 - - -
731,510.00 0.036 13.000 731,510.000 0.036 - - -
3,740,000.00 0.185 68.000 3,740,000.000 0.185 - - -
15,527,336.80 0.769 175.000 9,499,000.000 0.470 111.060 6,028,336.800 0.298
21,001,856.00 1.040 279.280 21,001,856.000 1.040 - - -
763,110.00 0.038 9.000 763,110.000 0.038 - - -
138,400,232.80 6.850 - 132,371,896.000 6.552 ### 0.298
- -
9,843,782.00 0.487 - - - 445.420 9,843,782.000 0.487
8,565,200.00 0.424 - - - 305.900 8,565,200.000 0.424
8,648,000.00 0.428 - - - 460.000 8,648,000.000 0.428
1,500,000.00 0.074 - - - 60.000 1,500,000.000 0.074
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
28,556,982.00 1.413 - - - ### 1.413
- -
- -
3,290,800.00 0.163 - - - 1.000 3,290,800.000 0.163
2,760,100.00 0.137 - - - 1.000 2,760,100.000 0.137
276,500.00 0.014 - - - 1.000 276,500.000 0.014
225,100.00 0.011 - - - 1.000 225,100.000 0.011
64,700.00 0.003 - - - 1.000 64,700.000 0.003
82,000.00 0.004 4.000 82,000.000 0.004 - - -
1,363,000.00 0.067 58.000 1,363,000.000 0.067 - - -
787,100.00 0.039 10.000 787,100.000 0.039 - - -
1,371,000.00 0.068 10.000 1,371,000.000 0.068 - - -
100,000.00 0.005 - - - 1.000 100,000.000 0.005
4,012,500.00 0.199 1.000 4,012,500.000 0.199 - - -
14,332,800.00 0.709 - 7,615,600.000 0.377 ### 0.332
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
- -
1,350,000.00 0.067 - - - 3.000 1,350,000.000 0.067
350,000.00 0.017 - - - 2.000 350,000.000 0.017
250,000.00 0.012 - - 1.000 250,000.000 0.012
250,000.00 0.012 - - - 1.000 250,000.000 0.012
250,000.00 0.012 1.000 250,000.000 0.012 - - -
1,800,000.00 0.089 - - - 2.000 1,800,000.000 0.089
45,000.00 0.002 - - - 3.000 45,000.000 0.002
25,650.00 0.001 - - - 3.000 25,650.000 0.001
157,500.00 0.008 - - - 1.000 157,500.000 0.008
580,500.00 0.029 - - - 3.000 580,500.000 0.029
211,500.00 0.010 - - - 1.000 211,500.000 0.010
500,000.00 0.025 1.000 250,000.000 0.012 1.000 250,000.000 0.012
5,770,150.00 0.286 - 500,000.000 0.025 ### 0.261
- -
1,000,000.00 0.049 1.000 500,000.000 0.025 1.000 500,000.000 0.025
220,000.00 0.011 - - - 4.000 220,000.000 0.011
550,000.00 0.027 - - - 10.000 550,000.000 0.027
1,732,500.00 0.086 - - - 7.000 1,732,500.000 0.086
270,000.00 0.013 - - - 1.000 270,000.000 0.013
6,080,000.00 0.301 50.000 6,080,000.000 0.301 - - -
2,846,700.00 0.141 - - - 9.000 2,846,700.000 0.141
3,907,000.00 0.193 10.000 3,907,000.000 0.193 - - -
2,226,000.00 0.110 - - - 21.000 2,226,000.000 0.110
680,000.00 0.034 - - - 8.000 680,000.000 0.034
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
1,000,000.00 0.049 - - - 2.000 1,000,000.000 0.049
141,600.00 0.007 6.000 141,600.000 0.007 - - -
120,000.00 0.006 6.000 120,000.000 0.006 - - -
312,000.00 0.015 12.000 312,000.000 0.015 - - -
- - - - - -
300,000.00 0.015 2.000 300,000.000 0.015 - - -
770,000.00 0.038 4.000 770,000.000 0.038 - - -
7,530,000.00 0.373 - - - 50.000 7,530,000.000 0.373
683,840.00 0.034 16.000 683,840.000 0.034 - - -
683,840.00 0.034 16.000 683,840.000 0.034 - - -
31,053,480.00 1.537 - 13,498,280.000 0.668 ### 0.869
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13
- -
- -
4,154,818.24 0.206 5.000 692,469.707 0.034 25.000 3,462,348.536 0.171
889,406.00 0.044 - - - 7.000 889,406.000 0.044
1,792,777.62 0.089 15.000 1,792,777.618 0.089 - - -
3,567,750.00 0.177 - - - 30.000 3,567,750.000 0.177
4,252,740.00 0.210 1.000 4,252,740.000 0.210 - - -
9,072,825.00 0.449 1.000 9,072,825.000 0.449 - - -
- - - - - - -
3,074,552.00 0.152 22.100 3,074,552.000 0.152 - - -
2,221,050.00 0.110 33.150 2,221,050.000 0.110 - - -
1,415,505.00 0.070 - - - 33.150 1,415,505.000 0.070
600,678.00 0.030 - - - 33.150 600,678.000 0.030
4,909,100.00 0.243 - - - 2.000 4,909,100.000 0.243
35,951,201.86 1.779 21,106,414.325 1.045 ### 0.735
Bandung, #REF!
ADDENDUM KONTRAK TELAH DILAKSANAKAN SISA PEKERJAAN
6 7 8 9 10 11 12 13