Anda di halaman 1dari 6

GRUP B

1.KEJURUAN TEKNIK INFORMATIKA


2.KEJURUAN DESAIN MODE DAN TEKSTIL (TATA BUSANA
3.KEJURUAN TEKNIK PENDINGIN (REFRIGERASI)
4.KEJURUAN BAHASA
5.KEJURUAN KESENIAN
6.KEJURUAN TATA RIAS
7.KEJURUAN KESEHATAN TRADISIONAL (TRADITIONAL H
8.KEJURUAN ROBOTIKA
9.KEJURUAN ELEKTRONIKA
10.KEJURUAN DESAIN KOMUNIKASI VISUAL
11.KEJURUAN PERHOTELAN
12.KEJURUAN MULTIMEDIA
13.KEJURUAN INSTALASI INFRASTRUKTUR TELEKOMUN
14.KEJURUAN KEPERAWATAN (CARE WORKER)
15.KEJURUAN KETERAMPILAN ALAT KESEHATAN
STIL (TATA BUSANA)
RIGERASI)

AL (TRADITIONAL HEALING)

VISUAL

KTUR TELEKOMUNIKASI (VSAT, FIBER OPTIC DAN BTS)


WORKER)
KESEHATAN
PEKERJAAN : PEMBANGUNAN WORKSHOP - BLK KOMUNITAS
PEMBERI BANTUAN : KEMNAKER RI
KEJURUAN :
GROUP : B
NAMA LEMBAGA :
KOTAMADYA / KABUPATEN : LOGO LEMBAGA
PROVINSI :
TAHUN : 2022
TANGGAL MULAI PEKERJAAN : 01 September 2022
TANGGAL SELESAI PEKERJAAN : 30 Desember 2022

MINGGU KE
NO ITEM PEKERJAAN % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 KET

i TERMIN I (Progress 0 % )
A PEKERJAAN PERSIAPAN 0.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.21
B PEKERJAAN TANAH DAN PONDASI 9.29 0.10 2.50 4.68 4.68
D STRUKTUR BETON 15.22 1.30 4.83 4.83 11.11
E PEKERJAAN ATAP 24.62 0.50 7.70 8.11 6.01
F PEKERJAAN PLAFOND 5.12 0.47 0.47 1.32
G PEKERJAAN PASANGAN 20.17 0.78 4.78 6.78 5.27
H PEKERJAAN KUSEN PINTU & JENDELA 12.32 1.94 1.94 1.94 1.94 2.54
I PEKERJAAN PENGECATAN 3.45 0.65 0.65 0.65 0.74
J PEKERJAAN PLUMBING & SANITAIR 2.68 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.18
K PEKERJAAN LISTRIK 6.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.86 6.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

ii TERMIN II (Progress 50% ) 100.00

Bobot Rencana 0.00 0.10 3.80 4.83 5.33 23.49 13.26 7.26 6.10 9.04 7.54 2.27 2.27 3.52 0.98 2.83 7.39
Akumulasi Rencana 0.00 0.10 3.91 8.73 14.06 37.55 50.81 58.07 64.16 73.21 80.74 83.01 85.28 88.80 89.78 92.61 100.00
Bobot Realisasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Akumulasi Realisasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
PEKERJAAN : PEMBANGUNAN WORKSHOP - BLK KOMUNITAS
PEMBERI BANTUAN : KEMNAKER RI
KEJURUAN : -
GROUP : B
NAMA LEMBAGA : -
KOTAMADYA / KABUPATEN : - LOGO
PROVINSI : - LEMBAGA
TAHUN : 2022
TANGGAL MULAI PEKERJAAN : 01 September 2022
TANGGAL SELESAI PEKERJAAN : 30 Desember 2022

MINGGU KE
NO ITEM PEKERJAAN % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 KET

i TERMIN I (Progress 0 % )
A PEKERJAAN PERSIAPAN 0.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.21
B PEKERJAAN TANAH DAN PONDASI 9.29 0.10 2.50 4.68 4.68
D STRUKTUR BETON 15.22 1.30 4.83 4.83 11.11
E PEKERJAAN ATAP 24.62 0.50 7.70 8.11 6.01
F PEKERJAAN PLAFOND 5.12 0.47 0.47 1.32
G PEKERJAAN PASANGAN 20.17 0.78 4.78 6.78 5.27
H PEKERJAAN KUSEN PINTU & JENDELA 12.32 1.94 1.94 1.94 1.94 2.54
I PEKERJAAN PENGECATAN 3.45 0.65 0.65 0.65 0.74
J PEKERJAAN PLUMBING & SANITAIR 2.68 0.33 0.33 0.33 0.33 0.33 0.33 0.33 0.18
K PEKERJAAN LISTRIK 6.91 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.86 6.26
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
ii TERMIN II (Progress 50% ) 100.00

Bobot Rencana 0.00 0.10 3.80 4.83 5.33 23.49 13.26 7.26 6.10 9.04 7.54 2.27 2.27 3.52 0.98 2.83 7.39
Akumulasi Rencana 0.00 0.10 3.91 8.73 14.06 37.55 50.81 58.07 64.16 73.21 80.74 83.01 85.28 88.80 89.78 92.61 100.00
Bobot Realisasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Akumulasi Realisasi 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

MENGETAHUI UNIT PENGELOLA KEGIATAN


Pimpinan.........................................
(nama lembaga)
1. KETUA ----ttd----

--ttd-- 2. SEKERTARIS ----ttd----


Stempel

3. ANGGOTA ----ttd----
(Nama Lengkap dan Jelas)
PEKERJAAN : PEMBANGUNAN WORKSHOP - BLK KOMUNITAS
PEMBERI BANTUAN : KEMNAKER RI
KEJURUAN : -
GROUP : B
NAMA LEMBAGA : -
KOTAMADYA / KABUPATEN : -
PROVINSI : -
TAHUN : 2022
TANGGAL MULAI PEKERJAAN : 01 September 2022
TANGGAL SELESAI PEKERJAAN : 30 Desember 2022

MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17

NO. URAIAN PEKERJAAN VOLUME SAT. %


PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)
A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 unt 0.11
2 Pek. Laporan & Dokumentasi 1.00 ls 0.11
B PEKERJAAN PONDASI & TANAH
1 Pek. Galian Tanah Pondasi 87.97 m3 1.58
2 Pek. Urug Tanah Kembali 29.32 m3 0.11
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) 19.55 m3 0.49
4 Pek. Pasir Urug
- Bawah Pondasi 13.12 m3 0.61
- Bawah Lantai 15.06 m3 0.70
5 Pek. Pondasi Tapak P1 (90x90x20) 17.28 m2 0.58
6 Pek. Pondasi Batu Belah P2 19.29 m3 2.37
7 Pek. Pondasi Tapak P3 (50x50x20) 9.60 m2 0.05
8 Pek. Sloof Beton S1 (15/30), S2 (15/25) 52.58 m2 2.79
C PEKERJAAN STRUKTUR
C.1 STRUKTUR BETON
1 Pek. Kolom Beton K1 (25/25) T.1,35 m 2.70 m2 0.18
2 Pek. Kolom Beton K2 (25/25) T.4,93 m 29.58 m2 1.99
3 Pek. Kolom Beton K3 (25/25) T.4,58 m 9.16 m2 0.62
4 Pek. Kolom Beton K4 (25/25) T.4,08m1 8.16 m2 0.55
5 Pek. Kolom Beton K5 (25/25) T.3,5m1 21.00 m2 1.42
6 Pek. Kolom pedestal pondasi Beton K1 (25/25) T.90cm 16.20 m2 1.09
7 Pek. Kolom Praktis KP (11/11) 26.46 m2 0.61
8 Pek. Balok Beton B1,B2 (20/30) 49.20 m2 3.39
9 Pek. Beton Balok Lintel BL (12/15), RB (12/15) 17.56 m2 2.72
10 Pek. Ramp Beton T = 10 cm 0.69 m2 0.15
11 Pek. Balok B3 dan Balok Sopi Sopi (15/20) 17.56 m2 1.21
12 Pek. Plat Beton Topi Topi (10/55) 7.67 m2 0.70
13 Pek. Kolom pipa besi 3"
- Pipa besi 18.80 m1 0.47
- Angkur Ø12mm 16.00 bh 0.06
- Baut 12mm 16.00 bh 0.02
- Base plate 6mm uk.25x25cm 5.89 kg 0.02
- Plate 6mm uk.7,5x7,5cm dudukan rangka atap 0.53 kg 0.00
C.2 PEKERJAAN ATAP
Rangka Atap
1 L 40.40.4 366.65 kg 1.57
2 2 X L 50,50,5 946.30 kg 4.04
3 Kuda Kuda 2 x C 100.50.20.2,3 32.50 kg 0.12
4 Gording C 100.50.20.2,3 875.00 kg 3.12
5 L 50,50,5 dudukan gording 49.80 kg 0.21
6 Trekstang Ø12 49.65 kg 0.18
7 Ikatan angin Ø16 166.60 kg 0.59
8 Pelat sambung T 10mm 377.10 kg 1.53
9 Angkur Ø16 x 300 mm 64.00 bh 0.24
10 Bout M12 x 30 mm 608.00 bh 0.91
11 Cat Sincromat Rangka baja 150.00 m2 0.65
Penutup
1 Atap Spandek t = 0.35 mm 285.12 m2 5.08
2 Pasang Aluminium Foil, Glaswool, Roofmesh 140.00 m2 2.75
3 Listplank GRC 116.40 m' 2.89
4 Nok samping flasing plat 95.60 m1 0.74
D PEKERJAAN PLAFOND
1 Plafond Gipsum 9 mm + Rangka Hollow 4/4 ; t = 0.35 137.03 m2 2.85
2 Plafond Calsiboard 4,5 mm + Rangka 70.00 m2 1.39
3 Lis Gipsum 5 cm 243.60 m' 0.88
E PEKERJAAN PASANGAN
1 Pasangan Dinding Bata 237.24 m2 4.50
2 Plester + Acian 498.20 m3 7.10
3 Pasangan Rolaag Bata 19.80 m' 0.34
4 Pekerjaan Lapis cor Beton t = 5 cm bawah lantai keramik 7.53 m3 1.21
5 Pekerjaan Rabat Beton t = 5 cm keliling bang lbr = 100 cm 2.43 m3 0.39
6 Pekerjaan Meja Beton Wastafel t = 8 cm 0.12 m3 0.08
7 Pasangan Keramik Lantai 40/40 Polished 136.40 m2 2.67
8 Pasangan Keramik Lantai 30/30 UnPolished (rabat) 52.00 m2 0.99
9 Pasangan Keramik Lantai 20/20 Unpolished 3.04 m2 0.06
10 Pasangan Plint Keramik Lantai 40/10 polished 97.40 m' 0.98
11 Pasangan Keramik meja & dinding Wastafel 20/20 Polished 1.77 m2 0.03
12 Pasangan Keramik Dinding 20/40 Polished 5.29 m2 0.22
13 Plestran & Acian Kaprot halus Kolom Entrace 5.12 m2 0.07
14 Pek. Logo & tulisan plat dinding fin. Cat duco 1.00 ls 0.53
MINGGU 1 MINGGU 2 MINGGU 3 MINGGU 4 MINGGU 5 MINGGU 6 MINGGU 7 MINGGU 8 MINGGU 9 MINGGU 10 MINGGU 11 MINGGU 12 MINGGU 13 MINGGU 14 MINGGU 15 MINGGU 16 MINGGU 17

NO. URAIAN PEKERJAAN VOLUME SAT. %


PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS PROGRESS

(%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%) (%)
15 Tali Air 25.00 m1 0.07
16 List Profil Dinding 27.90 m1 0.31
17 Pasang Prasasti granit 40/60 1.00 ls 0.13
18 Pasang Papan Nama (terpasang) 1.00 ls 0.47
F PEKERJAAN KUSEN PINTU & JENDELA
1 Kusen/Pintu type P1 1.00 unt 0.79
2 Kusen/Pintu type P2 4.00 unt 2.15
3 Kusen/Pintu type P3 1.00 unt 0.60
4 Kusen/Pintu type P4 (Spandrel) 1.00 unt 0.45
5 Kusen/Jendela type J1 9.00 unt 5.46
6 Kusen/Jendela type J3 4.00 unt 0.89
7 Kusen/Jendela type BV 1.00 unt 0.05
8 Tralis Jendela (Besi begel) 40.01 m2 1.93
G PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Interior 249.10 m2 1.33
2 Pek. Pengecatan Dinding Exterior 249.10 m2 1.14
3 Pek. Pengecatan Plafond 207.03 m2 0.74
4 Pek. Pengecatan Listplank 34.92 m2 0.24
H PEKERJAAN PLUMBING & SANITAIR
1 Instalasi Pipa PVC AW 4" 17.00 m' 0.44
2 Instalasi Pipa PVC AW 3" 12.00 m' 0.21
3 Instalasi Pipa PVC AW 2" 2.00 m' 0.02
4 Instalasi Pipa PVC AW 3/4" 20.00 m' 0.08
5 Instalasi Pipa PVC AW 1/2" 10.00 m' 0.03
6 Septic Tank dan Rembesan 1.00 unt 1.14
7 Pemasangan Closed Jongkok 1.00 bh 0.11
8 Pemasangan Kran Air 2.00 bh 0.04
9 Pemasangan Wastafel + Kran 2.00 bh 0.52
10 Floor Drain 1.00 bh 0.02
11 Pemasangan Cermin Wastafel 100x160 1.00 unt 0.06
I PEKERJAAN LISTRIK
1 Penyambungan Daya Listrik (BP) dan UJL 5,500.00 VA 1.17
2 Perijinan Sertifikat Layak Operasi (SLO) 5,500.00 VA 0.03
3 Panel Listrik Indoor (30x40x17) 1.00 unt 0.33
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2.00 m' 0.04
5 Pek. Instalasi Penerangan & Power NYM 3x2,5 mm2 + conduit 26.00 ttk 1.00
6 Pek. Instalasi Power AC 2 PK (18000 BTU) 2.00 ttk 0.08
7 Pemasangan Lampu TKI TL 2x36W (Tanpa Grid) 13.00 bh 0.96
8 Pemasangan Lampu Baret Kotak 36W 7.00 bh 0.31
9 Pemasangan Lampu Sorot Outdoor 20W 2.00 bh 0.09
10 Pemasangan Lampu Downlight 4'' 18W 4.00 bh 0.15
11 Pemasangan Saklar Tunggal 4.00 bh 0.04
12 Pemasangan Saklar Ganda 5.00 bh 0.06
13 Pemasangan Stop Kontak Single 8.00 bh 0.07
14 Pemasangan Stop Kontak Ganda 16.00 bh 0.15
15 Pemasangan Stop Kontak AC 2.00 bh 0.02
16 Pemasangan AC split wall 2 PK (18.000 BTU) 2.00 unit 2.11
17 Grounding (max 2 Ohm) 1.00 lot 0.28