JADWAL WAKTU PELAKSANAAN

PEKERJAAN : PEMBANGUNAN PUSKESMAS SOROMANDI


LOKASI : KECAMATAN LAMBU KABUPATEN BIMA
THN. ANGGARAN : 2019

Chart150
waktu pelaksanaan Title
hari
No. Bobot Ket
m1 m2 m3 m4 m5 m6 m7 m8 m9 m10 m11 m12 m13 m14 m15 m16 m17 m18 m19 m20 m21
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

I PEKERJAAN PERSIAPAN
A PEKERJAAN PERSIAPAN 41,211,275 0.54 0.27 0.27 100%
II PEKERJAAN STRUKTUR
A PEKERJAAN GALIAN DAN URUGAN 31,709,238 0.42 0.13 0.13 0.17
B PEKERJAAN BETON 2,672,925,081 35.30 1.76 1.76 3.53 3.53 7.06 7.06 5.29 5.29
C PEKERJAAN ATAP 302,389,199 3.99 2.00 2.00
III PEKERJAAN ARSITEKTUR
A PEKERJAAN GALIAN DAN URUGAN 232,592,872 3.07 0.46 0.77 0.92 0.92
B PEKERJAAN BETON PRAKTIS 273,475,693 3.61 0.36 0.36 0.72 0.72 1.44
C PEKERJAAN PASANGAN DAN PLESTERAN 1,273,434,616 16.82 0.84 0.84 1.68 1.68 1.68 4.20 4.20 1.68
D PEKERJAAN PINTU DAN JENDELA 515,183,437 6.80 1.36 1.36 1.36 1.36 1.36
E PEKERJAAN PLAFOND 270,746,250 3.58 0.89 0.89 0.89 0.89
F PEKERJAAN FINISHING LANTAI DAN DIND 355,623,471 4.70 0.94 0.94 0.94 0.94 0.94
G PEKERJAAN PENGECATAN 200,148,875 2.64 0.53 0.53 0.53 0.53 0.53
H PEKERJAAN FASADE 1,040,820,650 13.74 2.06 2.06 2.06 2.06 2.06 1.37 1.37 0.69
I PEKERJAAN PERALATAN SANITAIR 64,700,442 0.85 0.26 0.26 0.34
IV PEKERJAAN ELEKTRIKAL 188,714,665 2.49 0.25 0.25 0.25 0.50 0.50 0.25 0.25 0.25
V PEKERJAAN MEKANIKAL 109,139,338 1.44 0.14 0.14 0.29 0.29 0.29 0.14 0.14 0%

JUMLAH BOBOT 7,572,815,104 100.00 0.27 0.59 2.66 4.09 5.12 5.57 7.06 7.06 8.24 8.48 7.65 8.48 6.78 4.71 5.26 5.26 3.53 2.84 3.10 1.87 1.39

KOMULATIF 0.27 0.86 3.52 7.60 12.73 18.30 25.36 32.42 40.66 49.14 56.79 65.27 72.05 76.76 82.02 87.27 90.80 93.64 96.74 98.61 100.00

Keterangan : waktu pelaksanaan pekerjaan ini selama 150 hari sudah termasuk PHO pertama.

Tangerang, 03 Juli 2019


PT. WAHANATRI TATA WICAKSANA

RIYANTO
Direktur
REKAPITULASI RAB

NAMA PAKET PEKERJAAN : PEMBANGUNAN PUSKESMAS SOROMANDI


LOKASI : KECAMATAN LAMBU KABUPATEN BIMA
TAHUN ANGGARAN : 2019

NO. URAIAN PEKERJAAN SUB JUMLAH JUMLAH % TOTAL

PEMBANGUNAN PUSKESMAS SANGGAR

I PEKERJAAN PERSIAPAN Rp 41,211,275.00 0.54%

II PEKERJAAN STRUKTUR Rp 3,007,023,518.82 39.69%

III PEKERJAAN ARSITEKTUR Rp 4,226,726,307.22 55.78%

IV PEKERJAAN ELEKTRIKAL Rp 188,714,665.47 2.49%

V PEKERJAAN MEKANIKAL Rp 113,534,337.52 1.50%

TOTAL BIAYA PEKERJAAN Rp 7,577,210,104.03

JUMLAH TOTAL SELURUH PEKERJAAN 100.00% Rp 7,577,210,104.03

PPN 10 % Rp 757,721,010.40

Jumlah Total Seluruh Pekerjaan + PPN Rp 8,334,931,114.44

DIBULATKAN BIAYA FISIK Rp 8,334,900,000.00

TERBILANG: Delapan Milyar Tiga Ratus Tiga Puluh Lima juta Tujuh Ratus Ribu Rupiah

Tangerang, 03 Juli 2019


PT. WAHANATRI TATA WICAKSANA

RIYANTO
Direktur

REKAPITULASI 2
RENCANA ANGGARAN BIAYA ( RAB )

NAMA PAKET PEKERJAAN : PEMBANGUNAN PUSKESMAS SOROMANDI

LOKASI : KECAMATAN LAMBU KABUPATEN BIMA

TAHUN ANGGARAN : 2019

No. URAIAN PEKERJAAN VOL SAT HARSAT SUB JUMLAH BOBOT TOTAL

I PEKERJAAN PERSIAPAN
A PEKERJAAN PERSIAPAN 41,211,275.000
1 Pembersihan lokasi dan perataan tanah 850.00 m2 Rp 16,400.00 Rp 13,940,000.00 0.184% 2202

2 Uizet dan bowplank 100.00 m' Rp 67,500.00 Rp 6,750,000.00 0.089% 318

3 Papan Nama Proyek 1.00 unit Rp 269,350.00 Rp 269,350.00 0.004%


4 Listrik dan Air kerja 1.00 Ls Rp 6,000,000.00 Rp 6,000,000.00 0.079%
5 1 unit Membuat rambu-rambu proyek 1.00 Ls Rp 229,400.00 Rp 229,400.00 0.003%
6 Direksi Keet (Sewa) 9.00 m2 Rp 687,175.00 Rp 6,184,575.00 0.082%
7 Gudang (Sewa) 9.00 m2 Rp 552,800.00 Rp 4,975,200.00 0.066%
8 Pagar sementara 30.00 m' Rp 95,425.00 Rp 2,862,750.00 0.038% 189

BIAYA PEKERJAAN PERSIAPAN Rp 41,211,275.00

II PEKERJAAN STRUKTUR
A PEKERJAAN GALIAN DAN URUGAN 31,709,238.000
1 Galian Tanah FP 261.46 m3 Rp 78,650.00 Rp 20,564,143.60 0.271%
2 Urugan tanah kembali 191.17 m3 Rp 58,300.00 Rp 11,145,094.40 0.147% -

B PEKERJAAN BETON 2,672,925,081.476


LANTAI 1
1 Foot Plat FP 120x120x40
Beton K-250 33.41 m3 Rp 1,682,346.63 Rp 56,203,836.38 0.742%
Bekisting pondasi digunakan 3 kali 111.36 m2 Rp 153,835.00 Rp 17,131,065.60 0.226%
Pembesian dengan besi polos atau ulir 3890.18 kg Rp 19,812.10 Rp 77,072,555.93 1.017%
Bongkar Bekisting secara hati-hati 111.36 m2 Rp 6,996.00 Rp 779,074.56 0.010%
2 Kolom Pedestal K1 30x30
Beton K-250 14.52 m3 Rp 1,682,346.63 Rp 24,427,673.14 0.322%
Bekisting kolom digunakan 3 kali 145.20 m2 Rp 251,683.67 Rp 36,544,468.40 0.482%
Pembesian dengan besi polos atau ulir 2933.73 kg Rp 19,812.10 Rp 58,123,441.35 0.767%
Bongkar Bekisting secara hati-hati 145.20 m2 Rp 6,996.00 Rp 1,015,819.20 0.013%
3 Kolom Pedestal K2 30x30
Beton K-250 11.00 m3 Rp 1,682,346.63 Rp 18,505,812.98 0.244%
Bekisting kolom digunakan 3 kali 110.00 m2 Rp 251,683.67 Rp 27,685,203.33 0.365%
Pembesian dengan besi polos atau ulir 1269.31 kg Rp 19,812.10 Rp 25,147,658.95 0.332%
Bongkar Bekisting secara hati-hati 145.20 m2 Rp 6,996.00 Rp 1,015,819.20 0.013%
4 Sloof S1 20x30
Beton K-250 27.69 m3 Rp 1,682,346.63 Rp 46,584,178.32 0.615%
Bekisting sloof digunakan 3 kali 276.90 m2 Rp 159,793.33 Rp 44,246,774.00 0.584%
Pembesian dengan besi polos atau ulir 4404.09 kg Rp 19,812.10 Rp 87,254,360.64 1.152%
Bongkar Bekisting secara hati-hati 276.90 m2 Rp 6,996.00 Rp 1,937,192.40 0.026%
5 Kolom K1 40x40
Beton K-250 21.12 m3 Rp 1,682,346.63 Rp 35,531,160.93 0.469%
Bekisting kolom digunakan 3 kali 211.20 m2 Rp 251,683.67 Rp 53,155,590.40 0.702%
Pembesian dengan besi polos atau ulir 4048.84 kg Rp 19,812.10 Rp 80,215,943.72 1.059%
Bongkar Bekisting secara hati-hati 211.20 m2 Rp 6,996.00 Rp 1,477,555.20 0.019%
6 Kolom K2 40x40
Beton K-250 16.00 m3 Rp 1,682,346.63 Rp 26,917,546.16 0.355%
Bekisting kolom digunakan 3 kali 160.00 m2 Rp 251,683.67 Rp 40,269,386.67 0.531%
Pembesian dengan besi polos atau ulir 1804.90 kg Rp 19,812.10 Rp 35,758,859.29 0.472%
Bongkar Bekisting secara hati-hati 160.00 m2 Rp 6,996.00 Rp 1,119,360.00 0.015%
7 Balok B1 30x50
Beton K-250 27.26 m3 Rp 1,682,346.63 Rp 45,857,404.57 0.605%
Bekisting balok digunakan 3 kali 231.28 m2 Rp 254,873.67 Rp 58,947,181.63 0.778%
Pembesian dengan besi polos atau ulir 3909.07 kg Rp 19,812.10 Rp 77,446,935.94 1.022%
Bongkar Bekisting secara hati-hati 231.28 m2 Rp 6,996.00 Rp 1,618,034.88 0.021%
8 Balok B2 20x30
Beton K-250 17.52 m3 Rp 1,682,346.63 Rp 29,474,713.04 0.389%
Bekisting balok digunakan 3 kali 233.60 m2 Rp 254,873.67 Rp 59,538,488.53 0.786%
Pembesian dengan besi polos atau ulir 3715.12 kg Rp 19,812.10 Rp 73,604,249.70 0.971%
Bongkar Bekisting secara hati-hati 233.60 m2 Rp 6,996.00 Rp 1,634,265.60 0.022%
9 Balok Bordes tangga 20x30
Beton K-250 0.48 m3 Rp 1,682,346.63 Rp 807,526.38 0.011%
Bekisting tangga digunakan 3 kali 6.40 m2 Rp 239,438.83 Rp 1,532,408.53 0.020%
Pembesian dengan besi polos atau ulir 45.74 kg Rp 19,812.10 Rp 906,284.70 0.012%
Bongkar Bekisting secara hati-hati 6.40 m2 Rp 6,996.00 Rp 44,774.40 0.001%
10 Plat Bordes tangga tbl. 15
Beton K-250 1.20 m3 Rp 1,682,346.63 Rp 2,018,815.96 0.027%
Bekisting tangga digunakan 3 kali 8.00 m2 Rp 239,438.83 Rp 1,915,510.67 0.025%
Pembesian dengan besi polos atau ulir 132.27 kg Rp 19,812.10 Rp 2,620,480.43 0.035%
Bongkar Bekisting secara hati-hati 8.00 m2 Rp 6,996.00 Rp 55,968.00 0.001%
11 Plat Tangga tbl.15
Beton K-250 1.61 m3 Rp 1,682,346.63 Rp 2,707,673.80 0.036%

RENCANA ANGGARAN DAN BIAYA 2


No. URAIAN PEKERJAAN VOL SAT HARSAT SUB JUMLAH BOBOT TOTAL

Bekisting digunakan 3 kali 10.73 m2 Rp 239,438.83 Rp 2,569,118.80 0.034%


Pembesian dengan besi polos atau ulir 239.26 kg Rp 19,812.10 Rp 4,740,190.06 0.063%
Bongkar Bekisting secara hati-hati 10.73 m2 Rp 6,996.00 Rp 75,065.33 0.001%
12 Plat Lantai tbl.12 peil +4.00
Beton K-250 34.56 m3 Rp 1,682,346.63 Rp 58,141,899.70 0.767%
Bekisting lantai 288.00 m2 Rp 712,239.00 Rp 205,124,832.00 2.707%
Pembesian dengan besi polos atau ulir 4761.60 kg Rp 19,812.10 Rp 94,337,295.36 1.245%
Bongkar Bekisting secara hati-hati 288.00 m2 Rp 6,996.00 Rp 2,014,848.00 0.027%
13 Plat Atap tbl.10 peil +4.00
Beton K-250 52.83 m3 Rp 1,682,346.63 Rp 88,878,372.72 1.173%
Bekisting lantai 528.30 m2 Rp 712,239.00 Rp 376,275,863.70 4.966%
Pembesian dengan besi polos atau ulir 8734.56 kg Rp 19,812.10 Rp 173,049,976.18 2.284%
Bongkar Bekisting secara hati-hati 288.00 m2 Rp 6,996.00 Rp 2,014,848.00 0.027%
14 Plat Lantai droff of tbl. 15
Beton K-250 30.00 Rp 1,682,346.63 Rp 50,470,399.05 0.666%
Bekisting Plastik Cor 200.00 Rp 12,100.00 Rp 2,420,000.00 0.032%
Pembesian dengan Wiremash M-10 3404.00 Rp 14,030.50 Rp 47,759,822.00 0.630%

LANTAI 2
1 Kolom K1 40x40
Beton K-250 17.28 m3 Rp 1,682,346.63 Rp 29,070,949.85 0.384%
Bekisting kolom digunakan 3 kali 172.80 m2 Rp 251,683.67 Rp 43,490,937.60 0.574%
Pembesian dengan besi polos atau ulir 3312.68 kg Rp 19,812.10 Rp 65,631,226.68 0.866%
Bongkar Bekisting secara hati-hati 172.80 m2 Rp 6,996.00 Rp 1,208,908.80 0.016%
2 Balok B2 20x30
Beton K-250 6.10 m3 Rp 1,682,346.63 Rp 10,265,679.17 0.135%
Bekisting balok digunakan 3 kali 81.36 m2 Rp 254,873.67 Rp 20,736,521.52 0.274%
Pembesian dengan besi polos atau ulir 1293.93 kg Rp 19,812.10 Rp 25,635,452.72 0.338%
Bongkar Bekisting secara hati-hati 81.36 m2 Rp 6,996.00 Rp 569,194.56 0.008%
3 Plat Atap tbl.10 peil +8.00
Beton K-250 17.25 m3 Rp 1,682,346.63 Rp 29,020,479.45 0.383%
Bekisting lantai 172.50 m2 Rp 712,239.00 Rp 122,861,227.50 1.621%
Pembesian dengan besi polos atau ulir 2852.00 kg Rp 19,812.10 Rp 56,504,109.20 0.746%
Bongkar Bekisting secara hati-hati 172.50 m2 Rp 6,996.00 Rp 1,206,810.00 0.016%

C PEKERJAAN ATAP 302,389,199.340


LANTAI 01
1 Rangka atap baja ringan mutu G550 361.82 m2 Rp 184,800.00 Rp 66,864,299.04 0.882%
2 Penutup atap genteng metal berpasir 361.82 m2 Rp 176,800.00 Rp 63,969,740.64 0.844%
3 Bubungan genteng metal 45.20 m' Rp 113,250.00 Rp 5,118,900.00 0.068%
4 Alumunium foil single sheet (jenis lapis karung) 361.82 Rp 18,050.00 Rp 6,530,847.39 0.086%
5 Kawat ayakan 1 x 1 cm 361.82 Rp 18,650.00 Rp 6,747,939.27 0.089%
6 Lisplang 75.20 m' Rp 111,500.00 Rp 8,384,800.00 0.111%

LANTAI 02
1 Rangka atap baja ringan mutu G550 325.76 m2 Rp 184,800.00 Rp 60,200,448.00 0.794%
2 Penutup atap genteng metal berpasir 325.76 m2 Rp 176,800.00 Rp 57,594,368.00 0.760%
3 Bubungan genteng metal 58.02 m' Rp 113,250.00 Rp 6,570,765.00 0.087%
4 Alumunium foil single sheet (jenis lapis karung) 325.76 Rp 18,050.00 Rp 5,879,968.00 0.078%
5 Kawat ayakan 1 x 1 cm 325.76 Rp 18,650.00 Rp 6,075,424.00 0.080%
6 Lisplang 75.80 m' Rp 111,500.00 Rp 8,451,700.00 0.112%

BIAYA PEKERJAAN STRUKTUR Rp 3,007,023,518.82


III PEKERJAAN ARSITEKTUR
A PEKERJAAN GALIAN DAN URUGAN
232,592,872.385
1 Galian Tanah pondasi 498.13 m3 Rp 78,650.00 Rp 39,177,727.88 0.517%
2 Pemadatan tanah peninggian peil bangunan 1000.00 m3 Rp 154,500.00 Rp 154,500,000.00 2.039%
3 Buang Tanah Sisa Galian Keluar Lokasi 53.00 m3 Rp 34,430.00 Rp 1,824,824.43 0.024%
4 Urugan pasir bawah pondasi dan bawah lantai 171.51 m3 Rp 216,260.00 Rp 37,090,320.08 0.489%

B PEKERJAAN BETON PRAKTIS 273,475,693.444


LANTAI 01
1 Rabat beton (K-100) 62.05 m3 Rp 1,268,439.68 Rp 78,705,413.86 1.039%
2 Sloof Praktis SP 15 x 20
Beton K-175 3.48 m3 Rp 1,568,953.22 Rp 5,459,957.21 0.072%
Bekisting beton non struktur (Praktis) digunakan 3 ka 46.40 m2 Rp 159,793.33 Rp 7,414,410.67 0.098%
Pembesian dengan besi polos atau ulir 645.83 kg Rp 19,812.10 Rp 12,795,248.54 0.169%
Bongkar Bekisting secara hati-hati 46.40 m2 Rp 6,996.00 Rp 324,614.40 0.004%
3 Kolom KP 15x15
Beton K-175 6.57 m3 Rp 1,568,953.22 Rp 10,308,022.67 0.136%
Bekisting beton non struktur (Praktis) digunakan 3 ka 87.60 m2 Rp 159,793.33 Rp 13,997,896.00 0.185%
Pembesian dengan besi polos atau ulir 1106.68 kg Rp 19,812.10 Rp 21,925,654.83 0.289%
Bongkar Bekisting secara hati-hati 87.60 m2 Rp 6,996.00 Rp 612,849.60 0.008%
4 Balok Latai BL 12x12
Beton K-175 2.93 m3 Rp 1,568,953.22 Rp 4,590,882.64 0.061%
Bekisting beton non struktur (Praktis) digunakan 3 ka 48.77 m2 Rp 159,793.33 Rp 7,792,801.28 0.103%
Pembesian dengan besi polos atau ulir 771.48 kg Rp 19,812.10 Rp 15,284,691.74 0.202%
Bongkar Bekisting secara hati-hati 48.77 m2 Rp 6,996.00 Rp 341,180.93 0.005%

LANTAI 02
1 Kolom KP 15x15

RENCANA ANGGARAN DAN BIAYA 3


No. URAIAN PEKERJAAN VOL SAT HARSAT SUB JUMLAH BOBOT TOTAL

Beton K-175 1.58 m3 Rp 1,568,953.22 Rp 2,471,101.33 0.033%


Bekisting beton non struktur (Praktis) digunakan 3 ka 21.00 m2 Rp 159,793.33 Rp 3,355,660.00 0.044%
Pembesian dengan besi polos atau ulir 265.30 kg Rp 19,812.10 Rp 5,256,150.13 0.069%
Bongkar Bekisting secara hati-hati 21.00 m2 Rp 6,996.00 Rp 146,916.00 0.002%
2 Balok B3 15x20
Beton K-175 8.09 m3 Rp 1,568,953.22 Rp 12,689,693.66 0.167%
Bekisting beton non struktur (Praktis) digunakan 3 ka 131.00 m2 Rp 159,793.33 Rp 20,932,926.67 0.276%
Pembesian dengan besi polos atau ulir 2066.08 kg Rp 19,812.10 Rp 40,933,375.64 0.540%
Bongkar Bekisting secara hati-hati 148.28 m2 Rp 6,996.00 Rp 1,037,366.88 0.014%
3 Balok Latai BL 12x12
Beton K-175 0.74 m3 Rp 1,568,953.22 Rp 1,163,535.71 0.015%
Bekisting beton non struktur (Praktis) digunakan 3 ka 12.36 m2 Rp 159,793.33 Rp 1,975,045.60 0.026%
Pembesian dengan besi polos atau ulir 195.53 kg Rp 19,812.10 Rp 3,873,826.89 0.051%
Bongkar Bekisting secara hati-hati 12.36 m2 Rp 6,996.00 Rp 86,470.56 0.001%

C PEKERJAAN PASANGAN DAN PLESTERAN 1,273,434,615.853


LANTAI 01
1 Pasangan Bata 1Pc : 6 Ps 948.34 m3 Rp 126,500.00 Rp 119,965,263.00 1.583%
2 Pasangan dinding 1/2 bata 1:3 85.33 m2 Rp 133,350.00 Rp 11,378,755.50 0.150%
3 Pondasi batu kali 1Pc : 6Ps 187.33 m2 Rp 753,650.00 Rp 141,181,254.50 1.863%
4 Anak tangga (pasangan bata 1Pc : 4Ps) 80.36 m2 Rp 169,944.50 Rp 13,656,254.46 0.180%
5 Plesteran 1Pc : 6Ps 1896.68 m2 Rp 55,350.00 Rp 104,981,459.40 1.385%
6 Plesteran trasram 1Pc : 4Ps 34.58 m2 Rp 82,882.80 Rp 2,866,087.22 0.038%
7 Plesteran Beton 1Pc : 3Ps 717.21 m2 Rp 59,450.00 Rp 42,638,119.63 0.563%
8 Sponengan 739.87 m1 Rp 26,900.00 Rp 19,902,470.72 0.263%
9 Pagar Dinding Bata Keliling Bangunan 224.29 m1 Rp 2,700,000.00 Rp 605,583,000.00 7.992%
10 Acian 2648.47 m1 Rp 34,100.00 Rp 90,312,954.87 1.192%

LANTAI 02
1 Pasangan Bata 1Pc : 6 Ps 32.20 m2 Rp 126,500.00 Rp 4,073,300.00 0.054%
2 Pasangan bata trasram 1Pc : 4Ps 222.69 m2 Rp 169,944.50 Rp 37,844,303.41 0.499%
3 Plesteran 1Pc : 6Ps 32.20 m2 Rp 55,350.00 Rp 1,782,270.00 0.024%
4 Plesteran trasram 1Pc : 4Ps 477.57 m2 Rp 82,882.80 Rp 39,582,546.00 0.522%
5 Plesteran beton 1Pc : 3Ps 487.71 m2 Rp 59,450.00 Rp 28,994,508.13 0.383%
6 Sponengan 203.04 m1 Rp 26,900.00 Rp 5,461,776.00 0.072%
7 Acian 94.73 m2 Rp 34,100.00 Rp 3,230,293.00 0.043%

D PEKERJAAN PINTU DAN JENDELA 515,183,436.633


LANTAI 01
Catatan :
Pekerjaan pintu dan jendela sudah termasuk kusen, daun pintu, daun jendela dan aksesorisnya
(handle, kunci, engsel, door closer, dan lain-lain) terpasang rapi
1 Kusen dan daun pintu PJ1 + Aksesoris 1.00 unit Rp 30,318,246.04 Rp 30,318,246.04 0.400%
2 Kusen dan daun pintu PJ2+ Aksesoris 1.00 unit Rp 22,462,225.61 Rp 22,462,225.61 0.296%
3 Kusen dan daun pintu P1 + Aksesoris 9.00 unit Rp 4,879,504.79 Rp 43,915,543.09 0.580%
4 Kusen dan daun pintu P2 + Aksesoris 12.00 unit Rp 8,820,675.33 Rp 105,848,103.95 1.397%
5 Kusen dan daun pintu P3 + Aksesoris 1.00 unit Rp 9,057,023.49 Rp 9,057,023.49 0.120%
6 Kusen dan daun pintu P4 + Aksesoris 11.00 unit Rp 3,079,796.41 Rp 33,877,760.53 0.447%
7 Kusen dan daun pintu P5 + Aksesoris 1.00 unit Rp 2,910,249.01 Rp 2,910,249.01 0.038%
8 Kusen dan daun jendela J1 + Aksesoris 17.00 unit Rp 6,658,379.55 Rp 113,192,452.38 1.494%
9 Kusen dan daun jendela J2 + Aksesoris 3.00 unit Rp 5,166,937.95 Rp 15,500,813.85 0.205%
10 Kusen dan daun jendela J3 + Aksesoris 2.00 unit Rp 2,808,988.27 Rp 5,617,976.54 0.074%
11 Kusen dan daun jendela J4 + Aksesoris 1.00 unit Rp 4,753,857.13 Rp 4,753,857.13 0.063%
12 Kusen dan daun jendela BV + Aksesoris 5.00 unit Rp 2,237,733.01 Rp 11,188,665.06 0.148%

LANTAI 02
Catatan :
Pekerjaan pintu dan jendela sudah termasuk kusen, daun pintu, daun jendela dan aksesorisnya
(handle, kunci, engsel, door closer, dan lain-lain) terpasang rapi
1 Kusen dan daun pintu P1 + Aksesoris 4.00 unit Rp 4,879,504.79 Rp 19,518,019.15 0.258%
2 Kusen dan daun pintu P2 + Aksesoris 3.00 unit Rp 8,820,675.33 Rp 26,462,025.99 0.349%
3 Kusen dan daun pintu P4 + Aksesoris 2.00 unit Rp 3,079,796.41 Rp 6,159,592.82 0.081%
4 Kusen dan daun jendela J1 + Aksesoris 9.00 unit Rp 6,658,379.55 Rp 59,925,415.96 0.791%
5 Kusen dan daun jendela BV + Aksesoris 2.00 unit Rp 2,237,733.01 Rp 4,475,466.02 0.059%

E PEKERJAAN PLAFOND 270,746,250.000


LANTAI 01
1 Langit-langit PVC + Rangka Hollow + List profil 970.10 m2 Rp 212,500.00 Rp 206,146,250.00 2.721%

LANTAI 02
1 Langit-langit PVC + Rangka Hollow + List profil 304.00 m2 Rp 212,500.00 Rp 64,600,000.00 0.853%

F PEKERJAAN FINISHING LANTAI DAN DINDING 355,623,471.452


LANTAI 01
1 Keramik Polished 400 x 400 mm 148.40 m2 Rp 203,900.00 Rp 30,258,760.00 0.399%
2 Keramik Polished 400 x 400 mm 167.60 m1 Rp 203,900.00 Rp 34,173,640.00 0.451%
3 Keramik KM/WC 300 x 300 mm 362.88 m2 Rp 198,400.00 Rp 71,995,392.00 0.950%
4 Keramik Plint 100 x 400 mm 562.60 m' Rp 198,400.00 Rp 111,619,840.00 1.473%
5 Stepnosing 80 x 400 mm 30.00 m' Rp 53,550.00 Rp 1,606,500.00 0.021%
6 Railing Dinding Pipa Stainless Steel 72.11 m' Rp 41,866.11 Rp 3,018,811.45 0.040%

LANTAI 02

RENCANA ANGGARAN DAN BIAYA 4


No. URAIAN PEKERJAAN VOL SAT HARSAT SUB JUMLAH BOBOT TOTAL

1 Keramik Polished 400 x 400 mm 282.00 m2 Rp 203,900.00 Rp 57,499,800.00 0.759%


2 Keramik Polished 400 x 400 mm 6.00 m2 Rp 203,900.00 Rp 1,223,400.00 0.016%
3 Keramik KM/WC 300 x 300 mm 52.22 m2 Rp 198,400.00 Rp 10,360,448.00 0.137%
4 Keramik Plint 100 x 400 mm 170.70 m' Rp 198,400.00 Rp 33,866,880.00 0.447%

G PEKERJAAN PENGECA 1019 200,148,875.205


LANTAI 01
1 Cat dinding luar 447.27 m2 Rp 29,300.00 Rp 13,105,046.16 0.173%
2 Cat dinding dalam 2201.20 m2 Rp 24,850.00 Rp 54,699,883.37 0.722%
3 Waterproofing 589.60 m2 Rp 104,500.00 Rp 61,613,200.00 0.813%

LANTAI 02
1 Cat dinding luar 139.30 m2 Rp 29,300.00 Rp 4,081,490.00 0.054%
2 Cat dinding dalam 1931.43 m2 Rp 24,850.00 Rp 47,996,005.68 0.633%
3 Waterproofing 178.50 m2 Rp 104,500.00 Rp 18,653,250.00 0.246%

H PEKERJAAN FASADE 1,040,820,650.000


LANTAI 01
Catatan : 929

Pekerjaan fasade harus sesuai gambar rencana detail, sudah termasuk material pendukung dan terpasang rapi
1 ACP tebal 4mm PVDF 0,3 + Rangka Hollow Alumini 587.47 m2 Rp 1,065,400.00 Rp 625,890,538.00 8.260%
2 ACP Perforated tebal 4mm PVDF 0,3 + Rangka Holl 26.00 m2 Rp 1,065,400.00 Rp 27,700,400.00 0.366%
3 Tulisan Bahan Stainless Steel tinggi 90 cm "INS 270.00 cm Rp 7,800.00 Rp 2,106,000.00 0.028%

LANTAI 02
Catatan :
Pekerjaan fasade harus sesuai gambar rencana detail, sudah termasuk material pendukung dan terpasang rapi
1 ACP tebal 4mm PVDF 0,3 + Rangka Hollow Alumini 341.28 m2 Rp 1,065,400.00 Rp 363,599,712.00 4.799%
2 Tulisan Bahan Stainless Steel tinggi 60 cm "PU 1,080.00 cm Rp 7,800.00 Rp 8,424,000.00 0.111%
3 Tulisan Bahan Acrylic tinggi 90 cm "IGD" 2,700.00 mm Rp 3,000.00 Rp 8,100,000.00 0.107%
4 Tulisan Bahan Stainless Logo PUSKESMAS tinggi 1 1.00 ls Rp 5,000,000.00 Rp 5,000,000.00 0.066%

K PEKERJAAN PERALATAN SANITAIR 64,700,442.250


LANTAI 01
1 Stop Kran 1.00 bh Rp 230,029.25 Rp 230,029.25 0.003%
2 Pasang floordrain 11.00 bh Rp 36,190.00 Rp 398,090.00 0.005%
3 Pasang kran air 3/4 11.00 bh Rp 138,069.25 Rp 1,518,761.75 0.020%
4 Pasang kran wastafel 3/4 6.00 bh Rp 157,429.25 Rp 944,575.50 0.012%
5 Wastafel 6.00 bh Rp 825,440.00 Rp 4,952,640.00 0.065%
6 Urinoir 2.00 bh Rp 866,195.00 Rp 1,732,390.00 0.023%
7 Kloset duduk 11.00 bh Rp 3,451,536.00 Rp 37,966,896.00 0.501%
8 Pasang Roffdrain 14.00 bh Rp 86,130.00 Rp 1,205,820.00 0.016%

LANTAI 02
1 Pasang floordrain 2.00 bh Rp 36,190.00 Rp 72,380.00 0.001%
2 Pasang kran air 3/4 2.00 bh Rp 138,069.25 Rp 276,138.50 0.004%
3 Pasang kran wastafel 3/4 1.00 bh Rp 157,429.25 Rp 157,429.25 0.002%
4 Wastafel 1.00 bh Rp 825,440.00 Rp 825,440.00 0.011%
5 Kloset duduk 2.00 bh Rp 3,451,536.00 Rp 6,903,072.00 0.091%
6 Pasang Roffdrain 6.00 bh Rp 86,130.00 Rp 516,780.00 0.007%
7 Torn Fiberglass 1200 sekualitas pinguin 2.00 bh Rp 3,500,000.00 Rp 7,000,000.00 0.092%

BIAYA PEKERJAAN ARSITEKTUR Rp 4,226,726,307.22


IV PEKERJAAN ELEKTRIKAL 188,714,665.474

LANTAI 01

1 KWH meter PLN 23000 VA 23000.00 VA Rp 1,000.00 Rp 23,000,000.00 0.304%


2 Sertifikat Laik Operasi (SLO) 23000.00 VA Rp 100.00 Rp 2,300,000.00 0.030%
3 Instalasi listrik titik lampu dan stop kontak 241.00 titik Rp 179,850.00 Rp 43,343,850.00 0.572%
4 Instalasi listrik titik lampu dan exausfan 7.00 titik Rp 233,905.38 Rp 1,637,337.63 0.022%
5 Pas. Lampu LED 8 watt + fitting Centralite downlight 12.00 bh Rp 97,570.00 Rp 1,170,840.00 0.015%
6 Pas. Lampu LED 15 watt + fitting Centralite downlight 193.00 bh Rp 120,670.00 Rp 23,289,310.00 0.307%
7 Lampu LED Spot light IP 65 20 Watt 110 LM/Watt 22 1.00 bh Rp 6,084,650.00 Rp 6,084,650.00 0.080%
8 Lampu LED Wallwasher 48 Watt 3000k 24 Degree IP 1.00 bh Rp 3,617,900.00 Rp 3,617,900.00 0.048%
9 Lampu LED Strip R5050 14.4W/m IP 65 6000K + pow 43.00 bh Rp 50,600.00 Rp 2,175,800.00 0.029%
10 Pas. Stop kontak 39.00 bh Rp 45,450.00 Rp 1,772,550.00 0.023%
11 Pas. Saklar tunggal 10.00 bh Rp 42,400.00 Rp 424,000.00 0.006%
12 Pas. Saklar ganda / double 38.00 bh Rp 47,750.00 Rp 1,814,500.00 0.024%
13 Pas. Stop kontak AC 4.00 bh Rp 45,450.00 Rp 181,800.00 0.002%
14 Exhause fan plafon 7.00 bh Rp 170,170.00 Rp 1,191,190.00 0.016%
15 Panel lt.1
a Panel MDP/SDP lt.1 1.00 unit Rp 10,103,500.00 Rp 10,103,500.00 0.133%
Kotak Panel 60x80x30 1.00
MCB 16 A 3P 2.00
MCB 35 A 3P 1.00
CT 1.00
Cos 200A 3P 1.00
Indicator Lamp 3.00
Fuse Lamp 2A 3.00
BC 50 mm2 1.00
Bus Bar sistem Cu 5x(20 1.00
Sepatu kabel+ Sleeve+ Cab 1.00

RENCANA ANGGARAN DAN BIAYA 5


No. URAIAN PEKERJAAN VOL SAT HARSAT SUB JUMLAH BOBOT TOTAL

Wiring + Pemasangan 1.00


MCCB 10A, 3 phase 1.00
MCB 6A 3.00
MCB 3x6A 1.00
Accessories 1.00
b Kabel instalasi NYY 4 x 6 mm2 20.00 m Rp 86,075.00 Rp 1,721,500.00 0.023%
16 Pekerjaan Penyalur Petir
a Air terminal R-150 Early Streamer Emmission (ESE) 1.00 unit Rp 10,510,500.00 Rp 10,510,500.00 0.139%
b Kabel NYY 1x70 mm2 for down conductor 54.00 m' Rp 130,020.00 Rp 7,021,080.00 0.093%
c Connecting Sleeve 1.00 bh Rp 451,000.00 Rp 451,000.00 0.006%
d Schoen cable CU 50 3.00 bh Rp 55,000.00 Rp 165,000.00 0.002%
e Pipa Galvanis 1,5" med A dan dudukan untuk air ter 1.00 btg Rp 163,900.00 Rp 163,900.00 0.002%
f Bare cooper Conductor 70 mm2 untuk grounding 24.00 m' Rp 66,110.00 Rp 1,586,640.00 0.021%
g Pipa Galvanis 3/4" (untuk grounding) 4.00 btg Rp 342,100.00 Rp 1,368,400.00 0.018%
h Slitzen tembaga murni 3/4" (bukan lapisan) untuk gr 2.00 bh Rp 979,000.00 Rp 1,958,000.00 0.026%
i Timah 0.20 kg Rp 775,500.00 Rp 155,100.00 0.002%
j Pipa PVC 3/4" wavin untuk kabel NYY 80.00 m' Rp 19,898.18 Rp 1,591,854.00 0.021%
k klem kabel dan material bantu 1.00 ls Rp 650,000.00 Rp 650,000.00 0.009%
l Pembuatan sumur grounding 2 titik 2.00 unit Rp 2,762,100.00 Rp 5,524,200.00 0.073%
m Pembuatan bak kontrol grounding 40x40x30 cm 2.00 unit Rp 1,320,751.92 Rp 2,641,503.85 0.035%
n Biaya instalasi penangkal petir 1.00 ls Rp 2,000,000.00 Rp 2,000,000.00 0.026%
o Sertifikat dari Depnaker 1.00 unit Rp 3,000,000.00 Rp 3,000,000.00 0.040%
LANTAI 02
Instalasi listrik titik lampu dan stop kontak 75.00 titik Rp 179,850.00 Rp 13,488,750.00 0.178%
Pas. Lampu LED 8 watt + fitting Centralite downlight 3.00 bh Rp 97,570.00 Rp 292,710.00 0.004%
Pas. Lampu LED 15 watt + fitting Centralite downlight 60.00 bh Rp 120,670.00 Rp 7,240,200.00 0.096%
Pas. Stop kontak 7.00 bh Rp 45,450.00 Rp 318,150.00 0.004%
Pas. Saklar tunggal 3.00 bh Rp 42,400.00 Rp 127,200.00 0.002%
Pas. Saklar ganda / double 10.00 bh Rp 47,750.00 Rp 477,500.00 0.006%
Pas. Stop kontak AC 5.00 bh Rp 45,450.00 Rp 227,250.00 0.003%
Panel lt 2
a Panel lt.2 1.00 unit Rp 2,205,500.00 Rp 2,205,500.00 0.029%
Kotak panel uk. (60x40x20 1.00
MCCB 10A, 3 phase 1.00
MCB 6A 9.00
MCB 3x6A 1.00
Accessories 1.00
b Kabel instalasi NYY 4 x 6 mm2 20.00 m' Rp 86,075.00 Rp 1,721,500.00 0.023%

BIAYA PEKERJAAN ELEKTRIKAL Rp 188,714,665.47


V PEKERJAAN MEKANIKAL
A PEKERJAAN INSTALASI AIR BERSIH, BEKAS, KOTOR, HUJAN DAN PERALATAN SANITAIR
109,139,337.522

INSTALASI AIR BERSIH


2 Pompa Sumarsible sumur dalam ex.DAB 1.00 unit Rp 4,395,000.00 Rp 4,395,000.00 0.058%
1 Jaringan pipa air bersih, pipa PVC da. 3/4" 86.00 m' Rp 35,299.00 Rp 3,035,714.00 0.040%
1 Jaringan pipa air bersih, pipa PVC da. 1 1/4" 24.00 m' Rp 52,145.50 Rp 1,251,492.00 0.017%
LANTAI 02
1 Jaringan pipa air bersih, pipa PVC da. 3/4" 10.00 m' Rp 35,299.00 Rp 352,990.00 0.005%

PEKERJAAN INSTALASI AIR LIMBAH


1 Pipa PVC AW Ø 2" 38.00 m' Rp 59,818.00 Rp 2,273,084.00 0.030%
2 Pipa PVC AW Ø 3" 76.00 m' Rp 89,639.00 Rp 6,812,564.00 0.090%
3 Bak Kontrol 45 x 45 x 50 3.00 bh Rp 886,897.00 Rp 2,660,691.00 0.035%

INSTALASI AIR KOTOR


LANTAI 01
1 Septicktank 2.00 bh Rp 9,055,219.23 Rp 18,110,438.47 0.239%
2 Jaringan air kotor, pipa PVC dia. 3" 85.00 m' Rp 89,639.00 Rp 7,619,315.00 0.101%
3 Jaringan air tinja, pipa PVC dia. 4" 69.00 m' Rp 100,122.00 Rp 6,908,418.00 0.091%
4 Bak kontrol 45 x 45 tinggi 50 2.00 bh Rp 886,897.00 Rp 1,773,794.00 0.023%
5 Sumur peresapan 1.00 bh Rp 2,489,454.57 Rp 2,489,454.57 0.033%
LANTAI 02
1 Jaringan air kotor, pipa PVC dia. 3" 8.00 m' Rp 89,639.00 Rp 717,112.00 0.009%
2 Jaringan air tinja, pipa PVC dia. 4" 8.00 m' Rp 100,122.00 Rp 800,976.00 0.011%

PEKERJAAN INSTALASI AIR HUJAN


1 Sumur Peresapan Air Hujan 4.00 bh Rp 2,489,454.57 Rp 9,957,818.28 0.131%
2 Saluran U-20 98.00 m' Rp 169,943.40 Rp 16,654,453.20 0.220%
3 Bak kontrol 45 x 45 tinggi 50 15.00 bh Rp 886,897.00 Rp 13,303,455.00 0.176%
4 Jaringan air hujan, pipa PVC dia. 4" 144.00 m' Rp 100,122.00 Rp 14,417,568.00 0.190%

BIAYA PEKERJAAN MEKANIKAL Rp 113,534,337.52

TOTAL BIAYA PEKERJAAN 100.00% Rp 7,577,210,104.03 7,572,815,104.034

RENCANA ANGGARAN DAN BIAYA 6


I PEKERJAAN PERSIAPAN
A PEKERJAAN PERSIAPAN
1 Pembersihan lokasi dan perataan tanah
850.00 = 850.00 m2

2 Uizet dan bowplank


100.00 = 100.00 m'

3 Papan Nama Proyek


1.00 = 1.00 unit

4 Listrik dan Air kerja


1.00 = 1.00 Ls

5 Administrasi dan dokumentasi


1.00 = 1.00 Ls

6 Perlengkapan K3
1.00 = 1.00 Ls

7 Direksi Keet (Sewa)


3.00 x 3.00 = 9.00 m2

8 Gudang (Sewa)
3.00 x 3.00 = 9.00 m2

9 Pagar sementara
100.00 = 100.00 m'

II PEKERJAAN STRUKTUR
A PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah FP
FP 1.40 x 1.40 x 2.30 x 58.00 = 261.46 m3

2 Urugan tanah kembali = 191.17 m3


261.46 - 11.37 - 33.41 - 25.52

3 Pemadatan tanah (per 20 cm)


191.17 = 191.17 m3

B PEKERJAAN BETON
LANTAI 1
1 Foot Plat FP 120x120x40
1.20 x 1.20 x 0.4 x 58.00 FP1 = 33.41

Beton K-250
1.00 x 33.41 = 33.41 m3
Bekisting pondasi digunakan 3 kali
3.33 x 33.41 = 111.36 m2
Pembesian dengan besi polos atau ulir
116.44 x 33.41 = 3,890.18 kg
Bongkar Bekisting secara hati-hati
111.36 = 111.36 m2

2 Kolom Pedestal K1 30x30


0.40 x 0.40 x 2.75 x 33.00 = 14.52

Beton K-250
1.00 x 14.52 = 14.52 m3
Bekisting kolom digunakan 3 kali
10.00 x 14.52 = 145.20 m2
Pembesian dengan besi polos atau ulir
202.05 x 14.52 = 2,933.73 kg
Bongkar Bekisting secara hati-hati
145.20 = 145.20 m2

3 Kolom Pedestal K2 30x30


0.40 x 0.40 x 2.75 x 25.00 = 11.00

Beton K-250
1.00 x 11.00 = 11.00 m3
Bekisting kolom digunakan 3 kali
10.00 x 11.00 = 110.00 m2
Pembesian dengan besi polos atau ulir
115.39 x 11.00 = 1,269.31 kg
Bongkar Bekisting secara hati-hati
145.20 = 145.20 m2

4 Sloof S1 20x30
0.20 x 0.30 x 461.50 160 = 27.69

Beton K-250
1.00 x 27.69 = 27.69 m3
Bekisting sloof digunakan 3 kali
10.00 x 27.69 = 276.90 m2
Pembesian dengan besi polos atau ulir
159.05 x 27.69 = 4,404.09 kg
Bongkar Bekisting secara hati-hati
276.90 = 276.90 m2

5 Kolom K1 40x40
0.40 x 0.40 x 4.00 x 33.00 = 21.12

Beton K-250
1.00 x 21.12 = 21.12 m3
Bekisting kolom digunakan 3 kali
10.00 x 21.12 = 211.20 m2
Pembesian dengan besi polos atau ulir
191.71 x 21.12 = 4,048.84 kg
Bongkar Bekisting secara hati-hati
211.20 = 211.20 m2

6 Kolom K2 40x40
0.40 x 0.40 x 4.00 x 25.00 = 16.00

Beton K-250
1.00 x 16.00 = 16.00 m3
Bekisting kolom digunakan 3 kali
10.00 x 16.00 = 160.00 m2
Pembesian dengan besi polos atau ulir
112.81 x 16.00 = 1,804.90 kg
Bongkar Bekisting secara hati-hati
160.00 = 160.00 m2

7 Balok B1 30x50
0.30 x 0.55 x 165.20 peil +4.00 = 27.26

Beton K-250
1.00 x 27.26 = 27.26 m3
Bekisting balok digunakan 3 kali
8.48 x 27.26 = 231.28 m2
Pembesian dengan besi polos atau ulir
143.41 x 27.26 = 3,909.07 kg
Bongkar Bekisting secara hati-hati
231.28 = 231.28 m2

8 Balok B2 20x30
0.20 x 0.30 x 292.00 peil +4.00 = 17.52

Beton K-250
1.00 x 17.52 = 17.52 m3
Bekisting balok digunakan 3 kali
13.33 x 17.52 = 233.60 m2
Pembesian dengan besi polos atau ulir
212.05 x 17.52 = 3,715.12 kg
Bongkar Bekisting secara hati-hati
233.60 = 233.60 m2

9 Balok Bordes tangga 20x30


0.20 x 0.30 x 8.00 x 1.00 = 0.48

Beton K-250
1.00 x 0.48 = 0.48 m3
Bekisting tangga digunakan 3 kali
13.33 x 0.48 = 6.40 m2
Pembesian dengan besi polos atau ulir
95.30 x 0.48 = 45.74 kg
Bongkar Bekisting secara hati-hati
6.40 = 6.40 m2

10 Plat Bordes tangga tbl. 15


2.00 x 4.00 x 0.15 x 1.00 = 1.20

Beton K-250
1.00 x 1.20 = 1.20 m3
Bekisting tangga digunakan 3 kali
6.67 x 1.20 = 8.00 m2
Pembesian dengan besi polos atau ulir
110.22 x 1.20 = 132.27 kg
Bongkar Bekisting secara hati-hati
8.00 = 8.00 m2

11 Plat Tangga tbl.15


1.50 x 0.15 x 7.153 x 1.00 = 1.61
= 1.61
Beton K-250
1.00 x 1.61 = 1.61 m3
Bekisting digunakan 3 kali
6.67 x 1.61 = 10.73 m2
Pembesian dengan besi polos atau ulir
148.66 x 1.61 = 239.26 kg
Bongkar Bekisting secara hati-hati
10.73 = 10.73 m2

12 Plat Lantai tbl.12 peil +4.00


288 x 0.12 = 34.56

Beton K-250
1.00 x 34.56 = 34.56 m3
Bekisting lantai
8.33 x 34.56 = 288.00 m2
Pembesian dengan besi polos atau ulir
137.78 x 34.56 = 4,761.60 kg
Bongkar Bekisting secara hati-hati
288.00 = 288.00 m2

13 Plat Atap tbl.10 peil +4.00


528.3 x 0.10 = 52.83

Beton K-250
1.00 x 52.83 = 52.83 m3
Bekisting lantai
10.00 x 52.83 = 528.30 m2
Pembesian dengan besi polos atau ulir
165.33 x 52.83 = 8,734.56 kg
Bongkar Bekisting secara hati-hati
288.00 = 288.00 m2

14 Plat Lantai droff of tbl. 15


106.30 X 0.15 BAWAH LANTAI TERAS = 15.95
93.70 x 0.15 RAMM DROF OF = 14.06
30.00
Beton K-250
1.00 x 30.00 = 30.00 m3
Bekisting Plastik Cor
6.67 x 30.00 = 200.00 m2
Pembesian dengan Wiremash M-10
113.47 x 30.00 = 3,404.00 kg

LANTAI 2
1 Kolom K1 40x40
0.40 x 0.40 x 4.00 x 27.00 = 17.28

Beton K-250
1.00 x 17.28 = 17.28 m3
Bekisting kolom digunakan 3 kali
10.00 x 17.28 = 172.80 m2
Pembesian dengan besi polos atau ulir
191.71 x 17.28 = 3,312.68 kg
Bongkar Bekisting secara hati-hati
172.80 = 172.80 m2

2 Balok B2 20x30
0.20 x 0.30 x 101.70 peil +8.00 = 6.10

Beton K-250
1.00 x 6.10 = 6.10 m3
Bekisting balok digunakan 3 kali
13.33 x 6.10 = 81.36 m2
Pembesian dengan besi polos atau ulir
212.05 x 6.10 = 1,293.93 kg
Bongkar Bekisting secara hati-hati
81.36 = 81.36 m2

3 Plat Atap tbl.10 peil +8.00


172.5 x 0.10 = 17.25

Beton K-250
1.00 x 17.25 = 17.25 m3
Bekisting lantai
10.00 x 17.25 = 172.50 m2
Pembesian dengan besi polos atau ulir
165.33 x 17.25 = 2,852.00 kg
Bongkar Bekisting secara hati-hati
172.50 = 172.50 m2

C PEKERJAAN ATAP

LANTAI 1
1 Pek. Rangka baja ringan
4.35 x 2.8 x 4 kanopi = 48.72
22.215 x 5.86 x 2 = 260.36
9 x 5.86 x 1 = 52.74
= 361.82 = 361.82 m2

2 Pemasangan atap Onduvilla


361.82 = 361.82 m2

3 Pemasangan bubungan Onduvilla


45.2 = 45.20 m'

4 Lisplang
75.20 = 75.20 m'

LANTAI 2
1 Pek. Rangka baja ringan
17.3 x 6.5 x 2 = 224.90
4.7 x 3.4 x 2 = 31.96
5.3 x 6.5 x 2 = 68.90 +
325.76 = 325.76 m2
2 Pemasangan atap Onduvilla
325.76 = 325.76 m2

3 Pemasangan bubungan Onduvilla


58.02 = 58.02 m'

4 Lisplang
75.80 = 75.80 m'

III PEKERJAAN ARSITEKTUR


A PEKERJAAN GALIAN DAN URUGAN
1 Galian Tanah pondasi
pondasi 425.75 x 1.30 x 0.90 = 498.13 m3

2 Urugan tanah kembali


498.13 - 42.58 - 187.33 = 268.22 m3

3 Urugan tanah peninggian peil menggunakan tanah galian setempat


824.00 x 0.30 peninggian peil bangunan = 247.20 m3

4 Pemadatan tanah (per 20 cm)


268.22 + 247.20 = 515.42 m3

5 Buang Tanah Sisa Galian Keluar Lokasi


300.20 - 247.20 = 53.00 m3

6 Urugan pasir bawah pondasi dan bawah lantai


FP1 1.40 x 1.40 x 0.10 x 58.00 = 11.37
pas.pondasi batu kali 425.75 x 1.00 x 0.10 = 42.58
Rabat Keliling 101.10 x 1.50 x 0.10 = 15.17
bawah lantai 824.00 x 0.10 = 82.40
Droff of 200.00 x 0.10 = 20.00
Total = 171.51 m3 = 171.51 m3
B PEKERJAAN BETON NON STRUKTUR
LANTAI 1
1 Rabat beton (K-100)
Beton K-100
824.00 x 0.05 BAWAH LANTAI = 41.20
101.10 x 1.50 x 0.1 RABAT KELILING = 15.17
1.40 x 1.40 x 0.05 58.00 Pondasi = 5.68
= 62.05 = 62.05 m3

2 Sloof Praktis SP 15 x 20
0.15 x 0.20 x 116.00 = 3.48

Beton K-175
1.00 x 3.48 = 3.48 m3
Bekisting beton non struktur (Praktis) digunakan 3 kali
13.33 x 3.48 = 46.40 m2
Pembesian dengan besi polos atau ulir
185.58 x 3.48 = 645.83 kg
Bongkar Bekisting secara hati-hati
46.40 = 46.40 m2

3 Kolom KP 15x15
0.15 x 0.15 x 73.00 x 4.00 = 6.57

Beton K-175
1.00 x 6.57 = 6.57 m3
Bekisting beton non struktur (Praktis) digunakan 3 kali
13.33 x 6.57 = 87.60 m2
Pembesian dengan besi polos atau ulir
168.44 x 6.57 = 1,106.68 kg
Bongkar Bekisting secara hati-hati
87.60 = 87.60 m2

4 Balok Latai BL 12x12


0.12 x 0.12 x 203.20 = 2.93

Beton K-175
1.00 x 2.93 = 2.93 m3
Bekisting beton non struktur (Praktis) digunakan 3 kali
16.67 x 2.93 = 48.77 m2
Pembesian dengan besi polos atau ulir
263.66 x 2.93 = 771.48 kg
Bongkar Bekisting secara hati-hati
48.77 = 48.77 m2

LANTAI 2

1 Kolom KP 15x15
0.15 x 0.15 x 10.00 x 4.00 peil +4.00 = 0.90
0.15 x 0.15 x 10.00 x 1.00 peil +4.00 bawah atap = 0.23
0.15 x 0.15 x 20.00 x 1.00 peil +8.00 = 0.45 +
= 1.58

Beton K-175
1.00 x 1.58 = 1.58 m3
Bekisting beton non struktur (Praktis) digunakan 3 kali
13.33 x 1.58 = 21.00 m2
Pembesian dengan besi polos atau ulir
168.44 x 1.58 = 265.30 kg
Bongkar Bekisting secara hati-hati
21.00 = 21.00 m2

2 Balok B3 15x20
0.15 x 0.20 x 68.60 peil +5.00 = 2.06
0.15 x 0.20 x 141.00 peil +8.00 = 4.23
0.15 x 0.20 x 60.00 peil +9.00 = 1.80
= 8.09
Beton K-175
1.00 x 8.09 = 8.09 m3
Bekisting beton non struktur (Praktis) digunakan 3 kali
18.33 x 8.09 = 148.28 m2
Pembesian dengan besi polos atau ulir
255.45 x 8.09 = 2,066.08 kg
Bongkar Bekisting secara hati-hati
148.28 = 148.28 m2

2 Balok Latai BL 12x12


0.12 x 0.12 x 51.50 = 0.74

Beton K-175
1.00 x 0.74 = 0.74 m3
Bekisting beton non struktur (Praktis) digunakan 3 kali
16.67 x 0.74 = 12.36 m2
Pembesian dengan besi polos atau ulir
263.66 x 0.74 = 195.53 kg
Bongkar Bekisting secara hati-hati
12.36 = 12.36 m2

C PEKERJAAN PASANGAN DAN PLESTERAN


LANTAI 1
1 Pasangan Bata 1Pc : 6 Ps
280.25 x 4.00 Ruiang Kering = 1,121.00
101.50 x 2.50 km/wc (Ruang basah) = 253.75
Total = 1,121.00 m2
Lubang pintu dan jendela
7.85 x 3.00 x 1.00 PJ1 = 23.55
5.10 x 3.00 x 1.00 PJ2 = 15.30
0.98 x 2.56 x 9.00 P1 = 22.58
1.28 x 2.56 x 12.00 P2 = 39.32
1.20 x 2.10 x 1.00 P3 = 2.52
0.98 x 0.60 x 11.00 P4 = 6.47
0.98 x 2.10 x 1.00 P5 = 2.06
1.68 x 1.70 x 17.00 J1 = 48.55
0.70 x 1.70 x 3.00 J2 = 3.57
0.58 x 1.70 x 2.00 J3 = 1.97
2.64 x 1.73 x 1.00 J4 = 4.57
0.88 x 0.50 x 5.00 BV = 2.20
Total = 172.66 m2

Total pasangan bata 1Pc : 6 ps


1,121.00 - 172.66 = 948.34 m2

2 Pasangan bata trasram 1Pc : 4Ps


101.50 x 1.50 KM/WC = 101.50 +
Total = 101.50 m2
Lubang pintu dan jendela
0.98 x 1.50 x 11.00 P4 = 16.17 m2
Total = 16.17 m2

Total pasangan bata 1Pc : 4Ps


101.50 - 16.17 = 85.33 m2

3 Pondasi batu kali 1Pc : 6Ps


pas.pondasi batu kali 280.25 x 0.55 x 0.8 Ruiang Kering = 123.31 m3
pas.pondasi batu kali 101.50 x 0.55 x 0.8 km/wc (Ruang basah) = 44.66 m3
44.00 x 0.55 x 0.8 Droff of = 19.36 m3
187.33 m3 = 187.33 m3

4 Anak tangga (pasangan bata 1Pc : 4Ps)


0.20 x 0.30 x 1.50 x 20.00 x 1.00 x 10.71 = 80.36 m2
2.00 Total = 80.36 m2 = 80.36 m2

5 Plesteran 1Pc : 6Ps


948.34 x 2 = 1,896.68 m2

6 Plesteran trasram 1Pc : 4Ps


85.33 x 2 - 136.08 = 34.58 m2

7 Plesteran Beton 1Pc : 3Ps


717.21 = 717.21 m2
8 Sponengan
7.85 + 6.00 x 1.00 PJ1 = 47.10
5.10 + 6.00 1.00 PJ2 = 30.60
0.98 + 5.12 x 9.00 P1 = 45.16
1.28 + 5.12 x 12.00 P2 = 78.64
1.20 + 4.20 x 1.00 P3 = 5.04
0.98 + 1.20 x 11.00 P4 = 12.94
0.98 + 4.20 x 1.00 P5 = 4.12
1.68 + 3.40 x 17.00 J1 = 97.10
1.40 + 3.40 x 3.00 J2 = 14.28
1.16 + 3.40 x 2.00 J3 = 7.89
5.28 + 3.46 x 1.00 J4 = 18.27
1.76 + 1.00 x 5.00 BV = 8.80
Total = 369.93 m'
Total sponengan
369.93 x 2.00 = 739.87 m'
9 Acian
1,896.68 + 34.58 + 717.21 = 2,648.47 m2

LANTAI 2
1 Pasangan Bata 1Pc : 6 Ps
169.85 x 4.00 peil +4.00 = 679.40
60.00 x 1.00 peil +8.00 = 60.00
29.65 x 3.60 = 106.74
Total = 846.14 m2
Lubang pintu dan jendela
0.98 x 2.56 x 4.00 P1 = 10.04
1.28 x 2.56 x 3.00 P2 = 9.83
0.98 x 0.60 x 2.00 P4 = 1.18
1.68 x 1.70 x 9.00 J1 = 25.70
0.88 x 0.50 x 2.00 BV = 0.88
Total = 47.63 m2

Total pasangan bata 1Pc : 6 ps


846.14 - 47.63 = 798.51 m2

2 Pasangan bata trasram 1Pc : 4Ps


12.00 x 4.00 KM/WC = 48.00 +
Total = 48.00 m2
Lubang pintu dan jendela
0.98 x 1.50 x 2.00 P4 = 2.94 m2
Total = 2.94 m2

Total pasangan bata 1Pc : 4Ps


48.00 - 2.94 = 45.06 m2

3 Plesteran 1Pc : 6Ps


798.51 x 2 = 1,597.03 m2

4 Plesteran trasram 1Pc : 4Ps


45.06 x 2 - 52.22 = 37.90 m2

5 Plesteran beton 1Pc : 3Ps


435.80 = 435.80 m2

6 Sponengan
0.98 + 5.12 x 4.00 P1 = 20.07
1.28 + 5.12 x 3.00 P2 = 19.66
0.98 + 1.20 x 2.00 P4 = 2.35
1.68 + 3.40 x 9.00 J1 = 51.41
1.76 + 1.00 x 2.00 BV = 3.52
Total = 97.01 m'
Total sponengan
97.01 x 2.00 = 194.02 m'

7 Acian
1,597.03 + 37.90 + 435.80 = 2,070.73 m2

D PEKERJAAN PARTISI, PINTU, DAN JENDELA


LANTAI 1
1 Kusen dan daun pintu PJ1 + Aksesoris
1.00 = 1.00 unit

2 Kusen dan daun pintu PJ2+ Aksesoris


1.00 = 1.00 unit

3 Kusen dan daun pintu P1 + Aksesoris


9.00 = 9.00 unit

4 Kusen dan daun pintu P2 + Aksesoris


12.00 = 12.00 unit

5 Kusen dan daun pintu P3 + Aksesoris


1.00 = 1.00 unit

6 Kusen dan daun pintu P4 + Aksesoris


11.00 = 11.00 unit

7 Kusen dan daun pintu P5 + Aksesoris


1.00 = 1.00 unit

8 Kusen dan daun jendela J1 + Aksesoris


17.00 = 17.00 unit

9 Kusen dan daun jendela J2 + Aksesoris


3.00 = 3.00 unit

10 Kusen dan daun jendela J3 + Aksesoris


2.00 = 2.00 unit

11 Kusen dan daun jendela J4 + Aksesoris


1.00 = 1.00 unit

12 Kusen dan daun jendela BV + Aksesoris


5.00 = 5.00 unit

LANTAI 2

1 Kusen dan daun pintu P1 + Aksesoris


4.00 = 4.00 unit

2 Kusen dan daun pintu P2 + Aksesoris


3.00 = 3.00 unit

3 Kusen dan daun pintu P4 + Aksesoris


2.00 = 2.00 unit
4 Kusen dan daun jendela J1 + Aksesoris
9.00 = 9.00 unit

5 Kusen dan daun jendela BV + Aksesoris


2.00 = 2.00 unit

E PEKERJAAN PLAFOND
LANTAI 1
1 Langit-langit PVC + Rangka Hollow + List profil
970.10 = 970.10 m2

LANTAI 2
1 Langit-langit PVC + Rangka Hollow + List profil
304.00 = 304.00 m2
F PEKERJAAN FINISHING LANTAI DAN DINDING
LANTAI 1
1 Keramik lantai ukuran 60x60 polised sekualitas NIRO
293.00 - 167.60 = 125.40
1.50 x 0.50 x 20.00 anak Tangga = 15.00
2.00 x 4.00 Bordes tangga = 8.00 +
= 148.40 m2 = 148.40 m2

2 Keramik lantai ukuran 60x60 unpolised sekualitas NIRO


57.50 KM/WC = 57.50
3.80 SPOEL HOK = 3.80
106.30 TERAS = 106.30 +
= 167.60 = 167.60 m2

3 Keramik dinding ukuran 60x30 unpolised sekualitas NIRO


90.72 x 4.00 = 362.88
= 362.88 m2 = 362.88 m2

4 Hospital Plin 10 x 60 x 4
20.00 x 0.5 X 2 anak tangga = 10.00 m'
7.00 bordes = 7.00 m'
238.3 ruangan arah Vertikal = 238.30 m'
307.3 ruangan arah Horisontal = 307.30 m'
562.60 m' = 562.60 m'
5 Step nosing Keramik ukuran 60x10
20.00 x 1.50 x 1.00 tangga = 30.00 m'

6 Railing Dinding Pipa Stainless Steel


7.15 x 2.00 tangga = 14.31 m'
8.00 x 1.00 bordes = 8.00 m'
4.00 KM Difabel = 4.00 m'
45.80 Koridor = 45.80 m'
72.11 m' = 72.11 m'
LANTAI 2
1 Keramik lantai ukuran 60x60 polised sekualitas NIRO
282.00 = 282.00 m2

2 Keramik lantai ukuran 60x60 unpolised sekualitas NIRO


6.00 KM/WC = 6.00 m2

3 Keramik dinding ukuran 60x30 unpolised sekualitas NIRO


14.00 x 4.00 - 3.78 KM/WC = 52.22 m2

4 Plin Keramik ukuran 60x10 polised sekualitas NIRO


170.70 = 170.70 m'
G PEKERJAAN CAT
LANTAI 1
1 Cat dinding luar
138.00 x 4.00 = 552.00

Lubang pintu dan jendela


7.85 x 3.00 x 1.00 PJ1 = 23.55
5.10 x 3.00 x 1.00 PJ2 = 15.30
0.98 x 2.56 x 2.00 P1 = 5.02
1.68 x 1.70 x 17.00 J1 = 48.55
0.70 x 1.70 x 3.00 J2 = 3.57
0.58 x 1.70 x 2.00 J3 = 1.97
2.64 x 1.73 x 1.00 J4 = 4.57
0.88 x 0.50 x 5.00 BV = 2.20
Total = 104.73 m2

Total cat dinding luar


552.00 - 104.73 = 447.27 m2

2 Cat dinding dalam


2,648.47 - 447.27 = 2,201.20 m2

3 Waterproofing 528.30
528.3 Plat Atap tbl.10 peil +4.00 61.30
61.30 KM/WC SPOEL HOK 589.60 = 589.60 m2

LANTAI 2
1 Cat dinding luar
72.00 x 4.00 = 288.00

Lubang pintu dan jendela


4.80 x 3.40 x 9.00 J1 = 146.88
0.70 x 1.30 x 2.00 BV = 1.82 +
Total = 148.70 m2

Total cat dinding luar


288.00 - 148.70 = 139.30 m2

2 Cat dinding dalam


2,070.73 - 139.30 = 1,931.43 m2

3 Waterproofing = 172.50
172.50 Plat Atap tbl.10 peil +8.00 = 6.00
6.00 KM/WC Total = 178.50 = 178.50 m2

H PEKERJAAN FASADE
LANTAI 1
1 ACP tebal 4mm PVDF 0,3 + Rangka Hollow Aluminium 4x4 terpasang
3.10 x 148.00 tritisan luar = 458.8
19.00 x 1.25 depan = 23.75
8.00 x 2.00 = 16
5.70 x 12.80 = 72.96
5.70 x 2.80 = 15.96 +
= 587.47 = 587.47 m2

2 ACP Perforated tebal 4mm PVDF 0,3 + Rangka Hollow Aluminium 4x4 terpasang
26.00 = 26.00 m2

3 Tulisan Bahan Stainless Steel tinggi 90 cm "INSTALASI GAWAT DARURAT"


90.00 x 3 = 270.00 cm

LANTAI 2

1 ACP tebal 4mm PVDF 0,3 + Rangka Hollow Aluminium 4x4 terpasang
243.00 + 98.28 = 341.28 m2

2 Tulisan Bahan Stainless Steel tinggi 60 cm "PUSKESMAS SUROMANDI"


60.00 x 18 = 1,080.00 cm

3 Tulisan Bahan Acrylic tinggi 90 cm "IGD"


90.00 x 3 x 10 = 2,700.00 mm

4 Tulisan Bahan Stainless Logo PUSKESMAS tinggi 100 cm


1.00 = 1.00 ls

I PEKERJAAN SANITAIR
LANTAI 1
1 Stop Kran
1.00 = 1.00 bh

2 Pasang floordrain
11.00 = 11.00 bh

3 Pasang kran air 3/4


11.00 = 11.00 bh

4 Pasang kran wastafel 3/4


6.00 = 6.00 bh

5 Wastafel
6.00 = 6.00 bh

6 Urinoir
2.00 = 2.00 bh

7 Kloset duduk
11.00 = 11.00 bh

8 Pasang Roffdrain
14.00 = 14.00 bh
LANTAI 2
1 Pasang floordrain
2.00 = 2.00 bh

2 Pasang kran air 3/4


2.00 = 2.00 bh

3 Pasang kran wastafel 3/4


1.00 = 1.00 bh

4 Wastafel
1.00 = 1.00 bh

5 Kloset duduk
2.00 = 2.00 bh

6 Pasang Roffdrain
6.00 = 6.00 bh

7 Torn Fiberglass 1200 sekualitas pinguin


2.00 = 2.00

V PEKERJAAN ELEKTRIKAL
LANTAI 1
1 KWH meter PLN 23000 VA
23,000.00 = 23,000.00 VA

2 Sertifikat Laik Operasi (SLO)


23,000.00 = 23,000.00 VA

3 Instalasi listrik titik lampu dan stop kontak


241.00 = 241.00 titik

4 Instalasi listrik titik lampu dan exausfan


7.00 = 7.00 titik

5 Pas. Lampu LED 8 watt + fitting Centralite downlight 5 inch silver


12.00 = 12.00 bh

6 Pas. Lampu LED 15 watt + fitting Centralite downlight 5 inch silver


193.00 = 193.00 bh

7 Lampu LED Spot light IP 65 20 Watt 110 LM/Watt 220 V


1.00 = 1.00 bh

8 Lampu LED Wallwasher 48 Watt 3000k 24 Degree IP 65 24 V


1.00 = 1.00 bh

9 Lampu LED Strip R5050 14.4W/m IP 65 6000K + power driver


43.00 = 43.00 m
10 Pas. Stop kontak
39.00 = 39.00 bh

11 Pas. Saklar tunggal


10.00 = 10.00 bh

12 Pas. Saklar ganda / double


38.00 = 38.00 bh

13 Pas. Stop kontak AC


4.00 = 4.00 bh

14 Exhause fan plafon


7.00 = 7.00 bh

15 Panel lt.1
a. Panel MDP/SDP lt.1 1.00 = 1.00 unit
Kotak Panel 60x80x30 1.00 unit
MCB 16 A 3P 2.00 bh
MCB 35 A 3P 1.00 bh
CT 1.00 bh
Cos 200A 3P 1.00 bh
Indicator Lamp 3.00 bh
Fuse Lamp 2A 3.00 bh
BC 50 mm2 1.00 ls
Bus Bar sistem Cu 5x(20x5mm) 1.00 ls
Sepatu kabel+ Sleeve+ Cable tie 1.00 ls
Wiring + Pemasangan 1.00 ls
MCCB 10A, 3 phase 1.00 bh
MCB 6A 3.00 bh
MCB 3x6A 1.00 bh
Accessories 1.00 Ls

b. Kabel instalasi NYY 4 x 6 mm2


20.00 = 20.00 m'

16 Pekerjaan Penyalur Petir

a. Air terminal R-150 Early Streamer Emmission (ESE) technology


1.00 = 1.00 unit

b. Kabel NYY 1x70 mm2 for down conductor


54.00 = 54.00 m'

c. Connecting Sleeve
1.00 = 1.00 bh

d. Schoen cable CU 50
3.00 = 3.00 bh
e. Pipa Galvanis 1,5" med A dan dudukan untuk air terminal
1.00 = 1.00 btg

f. Bare cooper Conductor 70 mm2 untuk grounding


24.00 = 24.00 m'

g. Pipa Galvanis 3/4" (untuk grounding)


4.00 = 4.00 btg

h. Slitzen tembaga murni 3/4" (bukan lapisan) untuk ground rod


2.00 = 2.00 bh

i. Timah
0.20 = 0.20 kg

j. Pipa PVC 3/4" wavin untuk kabel NYY


80.00 = 80.00 m'

k. klem kabel dan material bantu


1.00 = 1.00 ls

l. Pembuatan sumur grounding 2 titik


2.00 = 2.00 unit

m. Pembuatan bak kontrol grounding 40x40x30 cm


2.00 = 2.00 unit

n. Biaya instalasi penangkal petir


1.00 = 1.00 ls

o. Sertifikat dari Depnaker


1.00 = 1.00 unit

LANTAI 2
1 Instalasi listrik titik lampu dan stop kontak
75.00 = 75.00 titik

2 Pas. Lampu LED 8 watt + fitting Centralite downlight 5 inch silver


3.00 = 3.00 bh

3 Pas. Lampu LED 15 watt + fitting Centralite downlight 5 inch silver


60.00 = 60.00 bh

4 Pas. Stop kontak


7.00 = 7.00 bh

5 Pas. Saklar tunggal


3.00 = 3.00 bh

6 Pas. Saklar ganda / double


10.00 = 10.00 bh
7 Pas. Stop kontak AC
5.00 = 5.00 bh

15 Panel lt 2
a. Panel lt.2 1.00 = 1.00 unit
Kotak panel uk. (60x40x20) 1.00 unit
MCCB 10A, 3 phase 1.00 bh
MCB 6A 9.00 bh
MCB 3x6A 1.00 bh
Accessories 1.00 Ls

b. Kabel instalasi NYY 4 x 6 mm2


20.00 = 20.00 m'

VI PEKERJAAN MEKANIKAL
A INSTALASI AIR BERSIH
LANTAI 1
1 Sumur Air Bersih
1.00 = 1.00 ls

2 Pompa Sumarsible sumur dalam ex.DAB


1.00 = 1.00 unit

3 Jaringan pipa air bersih, pipa PVC da. 3/4"


86.00 distribusi KMD/WC = 86.00 m'

4 Jaringan pipa air bersih, pipa PVC da. 1 1/4"


24.00 = 24.00 m'

LANTAI 2
1 Jaringan pipa air bersih, pipa PVC da. 3/4"
10.00 distribusi KMD/WC = 10.00 m'

B INSTALASI AIR LIMBAH


1 Pipa PVC AW Ø 2"
38.00 Pipa Dari Ruangan Ke Bak Penampungan = 38.00 m'

2 Pipa PVC AW Ø 3"


76.00 Bak Penampungan Ke IPAL = 76.00 m'

3 Bak Penampungan
1.00 = 1.00 bh

4 Bak Kontrol 45 x 45 x 50
3.00 = 3.00 bh

C INSTALASI AIR KOTOR


LANTAI 1
1 Septicktank
2.00 = 2.00 bh

2 Jaringan air kotor, pipa PVC dia. 3"


85 = 85.00 m'

3 Jaringan air tinja, pipa PVC dia. 4"


69.00 = 69.00 m'

4 Bak kontrol 45 x 45 tinggi 50


2.00 = 2.00 bh

5 Sumur peresapan
1.00 = 1.00 bh

LANTAI 2
1 Jaringan air kotor, pipa PVC dia. 3"
8 = 8.00 m'

2 Jaringan air tinja, pipa PVC dia. 4"


8.00 = 8.00 m'

C INSTALASI AIR HUJAN


1 Sumur Peresapan Air Hujan
4 = 4.00 bh

2 Saluran U-20
98 = 98.00 m'

3 Bak kontrol 45 x 45 tinggi 50


15.00 = 15.00 bh

4 Jaringan air hujan, pipa PVC dia. 4"


144.00 = 144.00 m'
A.6.1.1 HARGA SATUAN PEKERJAAN MEKANIKAL ELEKTRIKAL

A. 6.1.1.1. Pemasangan 1 bh Stop kontak

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 90,000.00 13,500.00
Tukang listrik L.02 OH 0.300 150,000.00 45,000.00
Kepala Tukang L.03 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 60,900.00
B. BAHAN
Stop kontak bh 1.000 24,000.00 24,000.00
Inbowdoss bh 1.000 7,100.00 7,100.00
JUMLAH HARGA BAHAN 31,100.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 92,000.00
E. Profit 10% * D 9,200.00
F. Harga Satuan Pekerjaan (D+E) 101,200.00

A. 6.1.1.1. Pemasangan 1 bh Stop kontak AC


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.150 90,000.00 13,500.00
Tukang listrik L.02 OH 0.300 150,000.00 45,000.00
Kepala Tukang L.03 OH 0.015 160,000.00 2,400.00
JUMLAH TENAGA KERJA 60,900.00
B. BAHAN
Stop kontak AC bh 1.000 130,000.00 130,000.00
Inbowdoss bh 1.000 7,100.00 7,100.00
JUMLAH HARGA BAHAN 137,100.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 198,000.00
E. Profit 10% * D 19,800.00
F. Harga Satuan Pekerjaan (D+E) 217,800.00

A. 6.1.1.2. Pemasangan 1 titik Saklar tunggal


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang listrik L.02 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 7,500.00
B. BAHAN
Kabel NYM 3x2,5 mm2 m' 12.000 10,500.00 126,000.00
Pipa conduit 20mm btg 3.000 11,700.00 35,100.00
inbowdoss bh 1.000 7,100.00 7,100.00
Saklar tunggal bh 1.000 14,500.00 14,500.00
JUMLAH HARGA BAHAN 182,700.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 190,200.00
E. Profit 10% * D 19,020.00
F. Harga Satuan Pekerjaan (D+E) 209,220.00
A. 6.1.1.3. Pemasangan 1 titik Saklar ganda

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang listrik L.02 OH 0.050 150,000.00 7,500.00
JUMLAH TENAGA KERJA 7,500.00
B. BAHAN
Kabel NYM 3x2,5 mm2 m' 18.000 10,500.00 189,000.00
Pipa conduit 20mm btg 4.500 11,700.00 52,650.00
inbowdoss bh 1.000 7,100.00 7,100.00
Saklar ganda bh 1.000 22,500.00 22,500.00
JUMLAH HARGA BAHAN 271,250.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 278,750.00
E. Profit 10% * D 27,875.00
F. Harga Satuan Pekerjaan (D+E) 306,625.00

A. 6.1.1.4. Pemasangan 1 bh lampu LED 8 watt

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang listrik L.02 OH 0.020 150,000.00 3,000.00
Kepala Tukang L.03 OH 0.005 160,000.00 800.00
JUMLAH TENAGA KERJA 4,700.00
B. BAHAN
Armateur lampu Downlight Ø 3" ex. PAN bh 1.000 54,000.00 54,000.00
lampu LED 8 W ex. PHILIPHS bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 84,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 88,700.00
E. Profit 10% * D 8,870.00
F. Harga Satuan Pekerjaan (D+E) 97,570.00

SPL A. 6.1.1.4. Pemasangan 1 bh lampu LED 15 watt

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang listrik L.02 OH 0.020 150,000.00 3,000.00
Kepala Tukang L.03 OH 0.005 160,000.00 800.00
JUMLAH TENAGA KERJA 4,700.00
B. BAHAN
Armateur lampu Downlight Ø 4" ex. PAN bh 1.000 65,000.00 65,000.00
lampu LED 15 W ex. PHILIPHS bh 1.000 40,000.00 40,000.00
JUMLAH HARGA BAHAN 105,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 109,700.00
E. Profit 10% * D 10,970.00
F. Harga Satuan Pekerjaan (D+E) 120,670.00

SPL A. 6.1.1.4. Pemasangan 1 bh Lampu LED Spot light IP 65 20 Watt 110 LM/Watt 220 V

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang Pemasangan titik 1.000 721,500.00 721,500.00

JUMLAH TENAGA KERJA 721,500.00


B. BAHAN
Lampu LED Spot light IP 65 20 Watt 110
bh 1.000 4,810,000.00 4,810,000.00
LM/Watt 220 V
JUMLAH HARGA BAHAN 4,810,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 5,531,500.00
E. Profit 10% * D 553,150.00
F. Harga Satuan Pekerjaan (D+E) 6,084,650.00

SPL A. 6.1.1.4. Pemasangan 1 bh Lampu LED Wallwasher 48 Watt 3000k 24 Degree IP 65 24 V

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang Pemasangan titik 1.000 429,000.00 429,000.00

JUMLAH TENAGA KERJA 429,000.00


B. BAHAN
Lampu LED Wallwasher 48 Watt 3000k
bh 1.000 2,860,000.00 2,860,000.00
24 Degree IP 65 24 V
JUMLAH HARGA BAHAN 2,860,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,289,000.00
E. Profit 10% * D 328,900.00
F. Harga Satuan Pekerjaan (D+E) 3,617,900.00

SPL A. 6.1.1.4. Pemasangan 1 m Lampu LED Strip R5050 14.4W/m IP 65 6000K + power driver

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang Pemasangan titik 1.000 6,000.00 6,000.00

JUMLAH TENAGA KERJA 6,000.00


B. BAHAN
Lampu LED Strip R5050 14.4W/m IP 65
bh 1.000 40,000.00 40,000.00
6000K + power driver
JUMLAH HARGA BAHAN 40,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 46,000.00
E. Profit 10% * D 4,600.00
F. Harga Satuan Pekerjaan (D+E) 50,600.00

SPL A. 6.1.1.4. Pemasangan 1 bh Exhause fan plafon

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang listrik L.02 OH 0.020 150,000.00 3,000.00
Kepala Tukang L.03 OH 0.005 160,000.00 800.00
JUMLAH TENAGA KERJA 4,700.00
B. BAHAN
Exhause fan plafon bh 1.000 150,000.00 150,000.00

JUMLAH HARGA BAHAN 150,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 154,700.00
E. Profit 10% * D 15,470.00
F. Harga Satuan Pekerjaan (D+E) 170,170.00
A. 6.1.1.6. Pemasangan 1 titik instalasi listrik stop kontak dan stop kontak AC

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang instalasi titik 1.000 80,000.00 80,000.00

JUMLAH TENAGA KERJA 80,000.00


B. BAHAN
Kabel NYM 3x2,5 mm2 m' 7.000 10,500.00 73,500.00
Pipa Conduit 20 mm ex. PRALON m' 7.000 2,925.00 20,475.00
aksesories pipa 35% pipa Ls 0.350 7,166.25
JUMLAH HARGA BAHAN 101,141.25
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 181,141.25
E. Profit 10% * D 18,114.13
F. Harga Satuan Pekerjaan (D+E) 199,255.38

A. 6.1.1.6. Pemasangan 1 titik instalasi listrik Penerangan dan exhaust fan

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang instalasi titik 1.000 80,000.00 80,000.00

JUMLAH TENAGA KERJA 80,000.00


B. BAHAN
Kabel NYM 2x2,5 mm2 m' 7.000 15,000.00 105,000.00
Pipa Conduit 20 mm ex. PRALON m' 7.000 2,925.00 20,475.00
aksesories pipa 35% pipa Ls 0.350 7,166.25
JUMLAH HARGA BAHAN 132,641.25
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 212,641.25
E. Profit 10% * D 21,264.13
F. Harga Satuan Pekerjaan (D+E) 233,905.38

A. 6.1.1.8.b Pemasangan 1 m' Kabel NYY 4x95 mm2

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang instalasi titik 1.000 6,250.00 6,250.00

JUMLAH TENAGA KERJA 6,250.00


B. BAHAN
Kabel NYY 4x95 mm2 m' 1.000 610,000.00 610,000.00

JUMLAH HARGA BAHAN 610,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 616,250.00
E. Profit 10% * D 61,625.00
F. Harga Satuan Pekerjaan (D+E) 677,875.00
A. 6.1.1.8.d Pemasangan 1 m' Kabel NYY 4x6 mm2

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang instalasi titik 1.000 6,250.00 6,250.00

JUMLAH TENAGA KERJA 6,250.00


B. BAHAN
Kabel NYY 4x6 mm2 m' 1.000 72,000.00 72,000.00

JUMLAH HARGA BAHAN 72,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 78,250.00
E. Profit 10% * D 7,825.00
F. Harga Satuan Pekerjaan (D+E) 86,075.00

A. 6.1.1.10. Pemasangan 1 unit Panel MDP

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 450,000.00 450,000.00

JUMLAH TENAGA KERJA 450,000.00


B. BAHAN
Kotak Panel 60x80x30 unit 1.000 600,000.00 600,000.00
MCB 16 A 3P bh 2.000 200,000.00 400,000.00
MCB 35 A 3P bh 1.000 500,000.00 500,000.00
CT bh 1.000 300,000.00 300,000.00
Cos 200A 3P bh 1.000 3,500,000.00 3,500,000.00
Indicator Lamp bh 3.000 25,000.00 75,000.00
Fuse Lamp 2A bh 3.000 25,000.00 75,000.00
BC 50 mm2 ls 1.000 750,000.00 750,000.00
Bus Bar sistem Cu 5x(20x5mm) ls 1.000 500,000.00 500,000.00
Sepatu kabel+ Sleeve+ Cable tie ls 1.000 150,000.00 150,000.00
Wiring + Pemasangan ls 1.000 1,000,000.00 1,000,000.00
MCCB 10A, 3 phase bh 1.000 300,000.00 300,000.00
MCB 6A bh 3.000 70,000.00 210,000.00
MCB 3x6A bh 1.000 200,000.00 200,000.00
Accessories Ls 1.000 175,000.00 175,000.00

JUMLAH HARGA BAHAN 8,735,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 9,185,000.00
E. Profit 10% * D 918,500.00
F. Harga Satuan Pekerjaan (D+E) 10,103,500.00

A. 6.1.1.13. Pemasangan 1 unit Panel SDP Lt.2

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 300,000.00 300,000.00

JUMLAH TENAGA KERJA 300,000.00


B. BAHAN
Kotak panel uk. (60x40x20) unit 1.000 400,000.00 400,000.00
MCCB 10A, 3 phase bh 1.000 300,000.00 300,000.00
MCB 6A bh 9.000 70,000.00 630,000.00
MCB 3x6A bh 1.000 200,000.00 200,000.00
Accessories Ls 1.000 175,000.00 175,000.00

JUMLAH HARGA BAHAN 1,705,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,005,000.00
E. Profit 10% * D 200,500.00
F. Harga Satuan Pekerjaan (D+E) 2,205,500.00

A. 6.1.1.11.a Pemasangan 1 unit Air terminal R-150 Early Streamer Emmission (ESE) technology

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 50,000.00 50,000.00

JUMLAH TENAGA KERJA 50,000.00


B. BAHAN
Air terminal R-150 Early Streamer Emmiss unit 1.000 9,500,000.00 9,500,000.00
material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 9,505,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 9,555,000.00
E. Profit 10% * D 955,500.00
F. Harga Satuan Pekerjaan (D+E) 10,510,500.00

A. 6.1.1.11.b Pemasangan 1m' kabel NYY 1x70 mm2 for down conductor

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 1,200.00 1,200.00

JUMLAH TENAGA KERJA 1,200.00


B. BAHAN
Kabel NYY 1x70 mm2 m' 1.000 112,000.00 112,000.00
material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 117,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 118,200.00
E. Profit 10% * D 11,820.00
F. Harga Satuan Pekerjaan (D+E) 130,020.00

A. 6.1.1.11.c Pemasangan 1bh conecting sleeve

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 25,000.00 25,000.00

JUMLAH TENAGA KERJA 25,000.00


B. BAHAN
Connecting Sleeve bh 1.000 380,000.00 380,000.00
material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 385,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 410,000.00
E. Profit 10% * D 41,000.00
F. Harga Satuan Pekerjaan (D+E) 451,000.00
A. 6.1.1.11.d Pemasangan 1bh Schoen cable CU 50

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 25,000.00 25,000.00

JUMLAH TENAGA KERJA 25,000.00


B. BAHAN
Schoen cable CU 50 bh 1.000 20,000.00 20,000.00
material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 25,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 50,000.00
E. Profit 10% * D 5,000.00
F. Harga Satuan Pekerjaan (D+E) 55,000.00

A. 6.1.1.11.e Pemasangan 1m' Pipa galvanis Dia. 1,5" dudukan untuk air terminal +Las

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 20,000.00 20,000.00

JUMLAH TENAGA KERJA 20,000.00


B. BAHAN
Pipa galvanis Dia. 1,5" m' 1.000 95,000.00 95,000.00
Perlengkapan ls 1.000 34,000.00 34,000.00

JUMLAH HARGA BAHAN 129,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 149,000.00
E. Profit 10% * D 14,900.00
F. Harga Satuan Pekerjaan (D+E) 163,900.00

A. 6.1.1.11.f Pemasangan 1kg plat plendes tebal 6mm untuk dudukan pipa galvanis 2,5" + Las

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 0.000 - -

JUMLAH TENAGA KERJA -


B. BAHAN
Plat plendes tebal 6mm kg 1.000 #REF! #REF!
Las cm 1.000 3,778.45 3,778.45
cat m 0.010 43,843.80 438.44

JUMLAH HARGA BAHAN #REF!


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) #REF!
E. Profit 10% * D #REF!
F. Harga Satuan Pekerjaan (D+E) #REF!

A. 6.1.1.11.g Kabel conductor BC 70 mm2 untuk grounding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 1,100.00 1,100.00

JUMLAH TENAGA KERJA 1,100.00


B. BAHAN
Kabel conductor BC 70 mm2 untuk groun m' 1.000 54,000.00 54,000.00
Material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 59,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 60,100.00
E. Profit 10% * D 6,010.00
F. Harga Satuan Pekerjaan (D+E) 66,110.00

A. 6.1.1.11.h 1 spot grounding road (tahanan pembumian maks. 3 ohm)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 25,000.00 25,000.00

JUMLAH TENAGA KERJA 25,000.00


B. BAHAN
Grounding road titik 1.000 1,500,000.00 1,500,000.00
Material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 1,505,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 1,530,000.00
E. Profit 10% * D 153,000.00
F. Harga Satuan Pekerjaan (D+E) 1,683,000.00

A. 6.1.1.11.i pemasangan 1 btg pipa galvanis 3/4" (untuk grounding)

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 25,000.00 25,000.00

JUMLAH TENAGA KERJA 25,000.00


B. BAHAN
Pipa galvanis 3/4" (untuk grounding) btg 1.000 210,000.00 210,000.00
Perlengkapan ls 1.000 76,000.00 76,000.00

JUMLAH HARGA BAHAN 286,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 311,000.00
E. Profit 10% * D 31,100.00
F. Harga Satuan Pekerjaan (D+E) 342,100.00

A. 6.1.1.11.j pemasangan 1 bh splitzen murni 3/4" (bukan lapisan) untuk ground rod

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 25,000.00 25,000.00

JUMLAH TENAGA KERJA 25,000.00


B. BAHAN
Splitzen tembaga murni 3/4" bh 1.000 860,000.00 860,000.00
material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 865,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 890,000.00
E. Profit 10% * D 89,000.00
F. Harga Satuan Pekerjaan (D+E) 979,000.00

A. 6.1.1.11.k pemasangan 1 kg timah

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 25,000.00 25,000.00

JUMLAH TENAGA KERJA 25,000.00


B. BAHAN
Timah kg 1.000 675,000.00 675,000.00
material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 680,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 705,000.00
E. Profit 10% * D 70,500.00
F. Harga Satuan Pekerjaan (D+E) 775,500.00

A. 6.1.1.11.l pemasangan 1 m' pipa PVC 3/4" for kabel NYY 1x50 mm2

Harga Satuan (Rp) Jumlah Harga


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 6,000.00 6,000.00

JUMLAH TENAGA KERJA 6,000.00


B. BAHAN
Pipa PVC 3/4" for kabel NYY 1x50 mm2 m' 1.000 8,955.00 8,955.00
perlengkapan 35% pipa ls 1.000 3,134.25 3,134.25

JUMLAH HARGA BAHAN 12,089.25


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 18,089.25
E. Profit 10% * D 1,808.93
F. Harga Satuan Pekerjaan (D+E) 19,898.18

A. 6.1.1.11.m pembuatan sumur grounding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Upah pasang unit 1.000 6,000.00 6,000.00

JUMLAH TENAGA KERJA 6,000.00


B. BAHAN
Sumur grounding unit 1.000 2,500,000.00 2,500,000.00
material bantu ls 1.000 5,000.00 5,000.00

JUMLAH HARGA BAHAN 2,505,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,511,000.00
E. Profit 10% * D 251,100.00
F. Harga Satuan Pekerjaan (D+E) 2,762,100.00

Hitung. Pembuatan 1bh bak kontrol grounding 40x40x30 cm

Harga Satuan (Rp) Jumlah Harga


No. Uraian Satuan Koefisien
(Rp) (Rp)
1 Galian tanah sampai 1 m m3 0.366 78,650.00 28,756.41
2 Pas dinding bata merah 1pc : 4ps m2 2.513 169,944.50 426,985.56
3 Plesteran Dinding 1Pc : 4Ps m2 5.025 82,882.80 416,486.07
4 Acian m2 5.025 48,578.75 244,108.22
5 Tarikan besi Ø10 mm kg 0.740 15,000.00 11,106.00
6 Plat beton, tebal 15 mm, Tulangan Rangkap P10 - 150
Beton K-250 m3 0.039 1,682,346.63 65,947.99
Bekisting beton non struktur (Praktis) digu m2 0.261 159,793.33 41,759.32
Pembesian dengan besi polos atau ulir kg 4.321 19,812.10 85,602.36
Total 1,320,751.92
DAFTAR SATUAN BAHAN BANGUNAN TERTINGGI

NO. NAMA BARANG / BAHAN / TENAGA UKURAN SATUAN HARGA SATUAN (Rp.) KETERANGAN

Upah
1 Pekerja Oh 90,000.00
2 Tenaga gali tanah/pondasi Oh 130,000.00
3 Tukang batu Oh 150,000.00
4 Tukang kayu Oh 150,000.00
5 Tukang cat Oh 150,000.00
6 Tukang besi Oh 150,000.00
7 Tukang Pipa Oh 150,000.00
8 Tukang Las Konstruksi Oh 160,000.00
9 Tukang Listrik Oh 150,000.00
10 Kepala tukang batu Oh 160,000.00
11 Kepala tukang kayu Oh 160,000.00
12 Kepala tukang cat Oh 155,000.00
13 Kepala tukang besi Oh 160,000.00
14 Kepala tukang listrik Oh 160,000.00
15 Kepala tukang Pipa Oh 155,000.00
16 Mandor Oh 160,000.00
17 Operator alat berat Oh 310,000.00
18 Operator alat ringan Oh 160,000.00
19 Sopir Oh 160,000.00
20 Mekanik Oh 160,000.00
21 Pembantu Operator Oh 160,000.00
22 Pembantu Sopir Oh 110,000.00
23 Pembantu mekanik Oh 110,000.00

NO. NAMA BARANG / BAHAN / TENAGA UKURAN SATUAN HARGA SATUAN (Rp.) KETERANGAN

Bahan

1 Pipa PVC dia 0,50" ex.Rucika/Wavin 4m btg 40,000.00 Kelas AW


Pipa PVC dia 0,75" ex.Rucika/Wavin 4m btg 48,000.00 Kelas AW
Pipa PVC dia 1" ex.Rucika/Wavin 4m btg 60,000.00 Kelas AW
Pipa PVC dia 1,25" ex.Rucika/Wavin 4m btg 70,000.00 Kelas AW
Pipa PVC dia 1,50"ex.Rucika/Wavin 4m btg 64,000.00 Kelas AW
Pipa PVC dia 2" ex.Rucika/Wavin 4m btg 88,000.00 Kelas AW
Pipa PVC dia 3" ex.Rucika/Wavin 4m btg 132,000.00 Kelas AW
Pipa PVC dia 4" ex.Rucika/Wavin 4m btg 200,000.00 Kelas AW
2 Batu Kali Belah m3 160,000.00
3 Kerikil alam 1-2cm m3 340,000.00
4 Kerikil alam 2-3cm m3 300,000.00
5 Kerikil alam 3-5cm m3 300,000.00
6 Kerikil alam 5-7cm m3 265,000.00
7 Batu Pecah Mesin 1-2cm m3 400,000.00
8 Batu Pecah Mesin 2-3cm m3 320,000.00
9 Batu Pecah Mesin 3-5cm m3 320,000.00
10 Pasir Pasang m3 240,000.00
11 Pasir Cor / beton m3 240,000.00
12 Pasir Urug m3 140,000.00
13 Tanah Urug m3 90,000.00
14 Sirtu m3 150,000.00
15 Buis Beton 1 m U 20 m1 75,000.00
16 Buis Beton 1 m dia 20cm m1 85,000.00
17 Buis Beton 0,5 m dia 80cm bh 135,000.00
18 Semen PC tiga roda 40 kg zak 98,000.00
19 Semen PC kolotan/Warna kwalitas Sedang kg 22,000.00
20 Semen PC kolotan/Warna kwalitas baik kg 25,000.00
21 Besi Beton SNI kg 15,000.00
22 Jaring Kawat baja wiremesh kg 11,000.00
23 Bendrat kg 27,000.00
24 Kawat Las kg 31,000.00
25 Baja Profil kg 24,000.00
26 Besi Profil Hitam kg 32,000.00
27 Besi Strip kg 24,000.00
28 Besi siku L 40 x 40 x 4 kg 24,000.00
29 Besi siku L 50 x 50 x 4 kg 24,000.00
30 Besi siku L 60 x 60 x 6 kg 24,000.00
31 Besi siku L 60 x 60 x 6 kg 24,000.00
32 Cat Besi Merk Emco kg 67,000.00
33 Cat kayu mutu menengah kg 60,000.00
34 Cat kayu mutu tinggi kg 72,000.00
35 Cat tembok mutu menegah kg 70,000.00
36 Cat tembok Tinggi kg 100,000.00
37 Cat genteng kg 60,000.00
38 Cat menie kayu kg 30,000.00
39 Cat menie besi kg 30,000.00
40 Plamir Tembok 1kg kg 30,000.00
41 Plamur kayu kg 33,000.00
42 Wateprofing SIKA kg 40,000.00
43 Pipa Besi GIP Diameter' 1" 6m btg 294,000.00
44 Pipa Besi GIP Diameter 1,5" 6m btg 264,000.00
45 Pipa Besi GIP Diameter 2" 6m btg 324,000.00
46 Pipa Besi GIP Diameter 3" 6m btg 534,000.00
47 Pipa Besi GIP Diameter 4" 6m btg 618,000.00
48 Pipa Stainless steel SS201 1 1/2'' tebal 1 mm btg 157,150.00
49 Pipa Stainless steel SS201 2'' tebal 1 mm btg 211,000.00
50 Paku besar, sedang , biasa kg 18,000.00
51 Paku Kecil kg 18,000.00
52 Paku Skrup kg 18,000.00
53 Ijuk kg 15,000.00
54 Granit Polished 60x60 sekualitas NIRRO m2 225,000.00
55 Granit Unpolished 60x60 sekualitas NIRRO m2 260,000.00
56 Granit dinding 30x60 sekualitas NIRRO m2 260,000.00
57 Stepnousing uk 8 x 60 bh 10,000.00
58 Plin 10 x 60 sekualitas NIRRO bh 10,000.00
59 Hospital Plin 10 x 60 x 4 bh 65,000.00
60 Batu Bata Merah bh 1,000.00
61 Seng Plat BJLS 18 lbr 72,500.00
62 Seng Plat BJLS 20 lbr 82,000.00
63 Seng Plat BJLS 25 lbr 110,000.00
64 Seng Plat BJLS 30 lbr 137,000.00
65 Kalsiplang lbr 60,000.00
66 Kayu Lapis Triplek 122x244 3 mm lbr 57,000.00
67 Kayu Lapis Triplek 122x244 6 mm lbr 82,000.00
68 Kayu Lapis Triplek 122x244 9 mm lbr 125,000.00
69 Kayu Lapis Triplek 122x244 12 mm lbr 190,000.00
70 Kayu dolken Ø 8 - 10/400 cm btg 50,000.00
71 Papan kayu kelas I m3 9,000,000.00
72 Papan kayu kelas II m3 7,500,000.00
73 Papan kayu kelas III m3 3,500,000.00
74 Papan kayu bekisting m3 3,250,000.00
75 Balok kayu kelas I m3 8,500,000.00
76 Balok kayu kelas II m3 4,500,000.00
77 Balok kayu kelas III m3 2,900,000.00
78 Balok kayu bekisting m3 2,900,000.00
79 Kaca Bening 5mm m2 120,000.00
80 Kaca bening 3 mm m2 82,000.00
81 Kaca Es 5 mm m2 250,000.00
82 Kaca Es 3 mm m2 175,000.00
83 Kaca Rayben 5 mm m2 125,000.00
84 Kaca Rayben 3 mm m2 100,000.00
85 Kaca Tempered 8 mm m2 385,000.00
86 Kaca Tempered 10 mm m2 410,000.00
87 Kaca Tempered 12 mm m2 460,000.00
88 Kunci tanam silinder bh 127,500.00
89 Jendela Naco Standart bh 385,000.00
90 air ltr 300.00
91 Minyak Bekisting ltr 17,900.00
92 Bensin ltr 6,900.00
93 Solar ltr 8,050.00
94 Minyak Pelumas ltr 32,000.00
95 Plastik cor terpasang m2 10,000.00
96 Kloset duduk merk INA bh 2,000,000.00
97 Kloset duduk Monoblok ex. TOTO bh 2,500,000.00 CW 421J Eco Washer TCW07S
98 Pompa Sumarsible sumur dalam ex.DAB unit 4,395,000.00 CS4A 18M OL
99 Roof drain 4" Stainlee Stail bh 60,000.00
100 Floor drain ex. YUTA 3" bh 14,600.00 DFVM
101 Kran air wastafel ex. TOTO bh 584,500.00 TX109LH
102 Kran air wastafel ex.YUTA bh 75,000.00 Basin TAP TBLF
103 Urinoir TOTO bh 462,000.00
104 Roofdrain stainlis steell bh 60,000.00
105 Stop kran air 1" pipa GIP setara onda bh 141,000.00
106 Stop kran air 1/2" - 3/4" pipa PVC setara onda bh 25,000.00
107 Stop kran air 1,25" pipa PVC setara YUTA bh 36,100.00 BVS 1,25"
108 Kran air ex. ONDA bh 57,400.00 A 801 T 3/4 inch
109 Kran air ex. YUTA bh 49,900.00 Bibcock polish BCO
110 Torn Fiberglass 1100 sekualitas pinguin bh 2,250,000.00 TB110
111 Torn Fiberglass 1200 sekualitas pinguin bh 3,500,000.00 TB120
112 Torn Fiberglass 2200 sekualitas pinguin bh 5,000,000.00 TB160
113 Langit-langit PVC + rangka terpasang merk. Indohyfon m2 190,909.09
114 ACP Perforated tebal 4mm, 0,3 pvdf terpasang merk. JIYU m2 1,200,000.00 Hollow aluminum 4x4 tebal 1,2 +
115 ACP Glossy tebal 4mm, 0,3 pvdf terpasang merk. JIYU m2 750,000.00 Hollow aluminum 4x4 tebal 1,2 +
116 Genteng Onduvilla lbr 60,000.00
117 Bubungan Onduvilla m' 95,000.00
118 Pemasangan 1 m2 Rangka atap baja ringan m2 200,000.00
119 Kuas bh 19,000.00
120 Amplas lbr 6,000.00
121 Lem kayu kg 33,000.00
122 Sealent tube 23,900.00
123 Rel pintu sorong/ geser track 1,8m ex. DEKKSON set 245,000.00 SR 8901 D3
124 Rel pintu sorong/ geser track 2m ex. DEKKSON set 330,000.00 SR 8901 D4
125 Minyak cat/ Thinner ltr 33,000.00
126 Wastafel bh 680,000.00
127 Wastafel merk INA bh 280,000.00
128 Wastafel wall hung lavatory merk TOTO bh 458,000.00 L529V1 WF
129 Wastafel self rimming lavatory merk TOTO bh 433,500.00 L 568 V3
130 Profil UPVC + galvanis m' 175,000.00
131 Profil Kaca m' 8,500.00
132 Skrup fixer bh 3,850.00
133 Sealtape bh 7,000.00
134 Grendel Pintu ,Door Bolt ex. DEKKSON bh 36,000.00 DB D02 3" SSS
135 Grendel Pintu flush bolt Stainless steel ex. DEKKSON bawah 20 cm bh 55,000.00 FB 040 8" SSS
136 Grendel Pintu flush bolt Stainless steel ex. DEKKSON atas 30 cm bh 75,000.00 FB 040 12" SSS
137 Grendel Jendela Rambuncis ex. DEKKSON bh 15,000.00 CH 428
138 Engsel Pintu ex. DEKKSON bh 125,000.00 ESS DL 4x3x3mm 2BB SSS
139 Engsel jendela casement 8" ex. DEKKSON SUS 304 bh 70,000.00 FS S/S 8"
140 Engsel jendela casement 12" ex. DEKKSON SUS 304 bh 84,000.00 FS S/S 12"
141 Engsel jendela casement 16" ex. DEKKSON SUS 304 bh 136,000.00 FS S/S 16"
142 Engsel jendela casement 20" ex. DEKKSON SUS 304 bh 236,000.00 FS S/S 20"
143 Daun pintu HDF unit 900,000.00
144 cylinder door lock ex. DEKKSON bh 83,500.00 DC DL 60 mm
145 Mortise ex. DEKKSON bh 200,000.00 MTS ILDL 82585 SSS
146 Door closer ex.DEKKSON bh 210,000.00 DCL 300 HO
147 Door Stoper pintu ex DEKKSON bh 70,000.00 DS 007 SN
148 Pull Handle 45 cm ex. DEKKSON 45 cm psg 419,000.00 PH EL802
149 Pull Handle Aluminum ex. NKM psg 40,000.00 ALH 5219 SL
150 Handle ex. DEKKSON psg 165,000.00 LHTR 0017 Oval SSS
151 Gembok ex MITSUI bh 100,000.00 MUPL 55
150 Bath Grab Bar Difabel ex. PALOMA bh 1,450,000.00 BAP 1319
152 Top Fitting PT 24 ex. DEKSSON bh 40,000.00 PT 24
153 Patch Fitting Pivot PT 40 ex. DEKSSON bh 490,000.00 PT 40PSS
154 Patch Fitting Pivot PT 30 ex. DEKSSON bh 300,000.00 PT 30PSS
155 Patch Fitting PT 20 ex. DEKSSON bh 250,000.00 PT 20PSS
156 Bottom Patch Fitting PT 10 ex. DEKSSON bh 300,000.00 PT 10PSS
157 Patch Lock US 10 + Cylinder PT 10 ex. DEKSSON bh 550,000.00 US 10
158 Floor Hinge ex. DEKSSON bh 850,000.00 FH DKS 84
159 Pas. Stop kontak ex.LEGRAND bh 24,000.00
160 Pas. Stop kontak AC ex.LEGRAND bh 130,000.00
161 Pas. Saklar ganda / double ex. LEGRAND bh 22,500.00
162 Pas. Saklar tunggal ex. LEGRAND bh 14,500.00
163 Pas. Inbowdoss ex. LEGRAND bh 7,100.00
164 Lampu Signade IP 65 terpasang /cm3 1,200.00 NVC/ALIU
165 Lampu LED Spot light IP 65 20 Watt 110 LM/Watt 220 V bh 4,810,000.00 NVC/ALIU
166 Lampu LED Wallwasher 48 Watt 3000k 24 Degree IP 65 24 V bh 2,860,000.00 NVC/ALIU
167 Lampu LED Strip R5050 14.4W/m IP 65 6000K + power driver m 40,000.00 NVC/ALIU
167 Kabel NYA 1 x 2,5 mm2 Supreme m' 6,000.00
168 Kabel NYM 3x6 mm2 Supreme m' 28,000.00
169 Kabel NYM 3x4 mm2 Supreme m' 18,800.00
170 Kabel NYM 3x2,5 mm2 Supreme m' 10,500.00
171 Kabel NYM 2x2,5 mm2 Supreme m' 15,000.00
172 Kabel NYY 1x70 mm2 Supreme m' 112,000.00
173 Kabel NYY 4x4 mm2 Supreme m' 58,000.00
174 Kabel NYY 4x10 mm2 Supreme m' 86,400.00
175 Kabel NYY 4x95 mm2 Supreme m' 610,000.00
176 Kabel NYY 4x120 mm2 Supreme m' 764,000.00
177 Pipa Conduit 20 mm ex. PRALON btg 11,700.00
178 Kotak Panel 60x80x30 unit 600,000.00
179 Kotak panel uk. (60x40x20) unit 400,000.00
180 MCB 16 A 3P bh 200,000.00
201 MCB 35 A 3P bh 500,000.00
202 CT bh 300,000.00
203 Cos 200A 3P bh 3,500,000.00
204 Indicator Lamp bh 25,000.00
205 Fuse Lamp 2A bh 25,000.00
206 BC 50 mm2 ls 750,000.00
207 Bus Bar sistem Cu 5x(20x5mm) ls 500,000.00
208 Sepatu kabel+ Sleeve+ Cable tie ls 150,000.00
209 Wiring + Pemasangan ls 1,000,000.00
210 MCCB 10A, 3 phase bh 300,000.00
211 MCB 6A bh 70,000.00
212 MCB 3x6A bh 200,000.00
213 Air terminal R-150 Early Streamer Emmission (ESE) technology unit 9,500,000.00
214 Connecting Sleeve bh 380,000.00
215 Schoen cable CU 50 bh 20,000.00
216 Pipa galvanis Dia. 1,5" m' 95,000.00
217 Kabel conductor BC 70 mm2 untuk grounding m' 54,000.00
218 Grounding road titik 1,500,000.00
219 Pipa galvanis 3/4" (untuk grounding) btg 210,000.00
220 Splitzen tembaga murni 3/4" bh 860,000.00
221 Timah kg 675,000.00
222 Pipa PVC 3/4" for kabel NYY 1x50 mm2 m' 35,820.00
223 Sumur grounding unit 2,500,000.00
223 Exhause fan plafon bh 150,000.00
223 Bus Bar sistem Cu 5x(20x5mm) ls 850,000.00
223 Sepatu kabel+ Sleeve+ Cable tie ls 150,000.00
223 Tulisan Stainless steel per cm terpasang cm 7,800.00
223 Tulisan Arcylic per mm terpasang mm 3,000.00
223 lampu LED 8 W ex. PHILIPHS bh 30,000.00
223 lampu LED 15 W ex. PHILIPHS bh 40,000.00
223 Armateur lampu Downlight Ø 4" ex. PANASONIC bh 65,000.00
223 Armateur lampu Downlight Ø 3" ex. PANASONIC bh 54,000.00
ANALISA HARGA SATUAN

HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
1 A.2.2.1.2 (K3) Pembuatan 1 m2 Pagar Sementara 202,035.17
A Tenaga 84,400.00
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.400 150,000.00 60,000.00
Kepala Tukang Kayu L.03 OH 0.020 160,000.00 3,200.00
Mandor L.04 OH 0.020 160,000.00 3,200.00
B Bahan 466,605.00
Dolken kayu diameter 8-10/400 cm Btg 1.250 50,000.00 62,500.00
Balok kayu 5/7 m3 0.072 2,900,000.00 208,800.00
Paku sedang Kg 0.060 18,000.00 1,080.00
Semen Portland Kg 2.500 2,450.00 6,125.00
Pasir beton m3 0.050 240,000.00 12,000.00
Kerikil alam m3 0.090 340,000.00 30,600.00
Seng Plat BJLS 25 Lbr 1.200 110,000.00 132,000.00
Meni besi ltr 0.450 30,000.00 13,500.00
C PERALATAN
D Jumlah A + B + C 551,005.00
E Overhead & Profit 10.0% 55,100.50
F Harga Satuan Pekerjaan (D+E) 606,105.50
H Harga Satuan Pekerjaan Sewa (F/3) 202,035.17

2 A.2.2.1.5 (K3) Pembuatan 1 m2 kantor sementara lantai plesteran / Direksi Keet (SEWA) 609,302.83
A Tenaga 686,000.00
Pekerja L.01 OH 2.000 90,000.00 180,000.00
Tukang Kayu L.02 OH 2.000 150,000.00 300,000.00
Tukang Batu L.02 OH 1.000 150,000.00 150,000.00
Kepala Tukang Kayu L.03 OH 0.300 160,000.00 48,000.00
Mandor L.04 OH 0.050 160,000.00 8,000.00
B Bahan 975,735.00
Dolken kayu diameter 8-10/400 cm Btg 1.250 50,000.00 62,500.00
Balok kayu bekisting m3 0.180 2,900,000.00 522,000.00
Paku sedang Kg 0.080 18,000.00 1,440.00
Besi Strip Kg 1.100 24,000.00 26,400.00
Semen Portland Kg 35.000 2,450.00 85,750.00
Pasir pasang m3 0.150 240,000.00 36,000.00
Pasir beton m3 0.100 240,000.00 24,000.00
Kerikil alam m3 0.150 340,000.00 51,000.00
Bata merah Bh 30.000 1,000.00 30,000.00
Seng Plat BJLS 25 Lbr 0.250 110,000.00 27,500.00
Jendela nako Bh 0.200 385,000.00 77,000.00
Kaca Bening 5mm m2 0.080 120,000.00 9,600.00
Kunci tanam silinder Bh 0.150 127,500.00 19,125.00
Plywood 4mm /Triplek 4mm Lbr 0.060 57,000.00 3,420.00
C PERALATAN
D Jumlah A + B + C 1,661,735.00
E Overhead & Profit 10.0% 166,173.50
F Harga Satuan Pekerjaan (D+E) 1,827,908.50
H Harga Satuan Pekerjaan Sewa (F/3) 609,302.83

3 A.2.2.1.7 (K3) Pembuatan 1 m2 gudang semen dan peralatan (SEWA) 482,377.50


A Tenaga 430,000.00
Pekerja L.01 OH 1.000 90,000.00 90,000.00
Tukang Kayu L.02 OH 2.000 150,000.00 300,000.00
Kepala Tukang Kayu L.03 OH 0.200 160,000.00 32,000.00
Mandor L.04 OH 0.050 160,000.00 8,000.00
B Bahan 885,575.00
Dolken kayu diameter 8-10/400 cm Btg 1.700 50,000.00 85,000.00
Balok kayu bekisting m3 0.210 2,900,000.00 609,000.00
Paku sedang Kg 0.300 18,000.00 5,400.00
Semen Portland Kg 10.500 2,450.00 25,725.00
Pasir beton m3 0.030 240,000.00 7,200.00
Kerikil alam m3 0.050 340,000.00 17,000.00
Seng gelombang Lbr 1.500 72,500.00 108,750.00
Seng Plat BJLS 25 Lbr 0.250 110,000.00 27,500.00
C PERALATAN
D Jumlah A + B + C 1,315,575.00
E Overhead & Profit 10.0% 131,557.50
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
F Harga Satuan Pekerjaan (D+E) 1,447,132.50
H Harga Satuan Pekerjaan Sewa (F/3) 482,377.50

4 A.2.2.1.9 Membersihkan 1 m2 Lapangan dan Perataan 18,700.00


A Tenaga 17,000.00
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Mandor L.04 OH 0.050 160,000.00 8,000.00
B Bahan
C PERALATAN
D Jumlah A + B + C 17,000.00
E Overhead & Profit 10.0% 1,700.00
F Harga Satuan Pekerjaan (D+E) 18,700.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
5 A.2.2.1.4 Pengukuran dan Pemasangan 1 m' Bouwplank 92,741.00
A Tenaga 26,400.00
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Kayu L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 57,910.00
Balok kayu bekisting m3 0.012 2,900,000.00 34,800.00
Paku Biasa 2" - 5" Kg 0.020 18,000.00 360.00
Papan kayu bekisting m3 0.007 3,250,000.00 22,750.00
C PERALATAN
D Jumlah A + B + C 84,310.00
E Overhead & Profit 10.0% 8,431.00
F Harga Satuan Pekerjaan (D+E) 92,741.00

6 SNI 2835 : 2008 Papan Nama Proyek 561,550.00


A Tenaga 129,600.00
Pekerja L.01 OH 0.500 90,000.00 45,000.00
Tukang Kayu L.02 OH 0.500 150,000.00 75,000.00
Kepala Tukang Kayu L.03 OH 0.050 160,000.00 8,000.00
Mandor L.04 OH 0.010 160,000.00 1,600.00
B Bahan 380,900.00
Triplek 9 mm lb 1.000 125,000.00 125,000.00
Paku Biasa 2" - 5" kg 0.250 18,000.00 4,500.00
Cat kayu mutu menengah kg 1.000 60,000.00 60,000.00
Balok kayu bekisting m3 0.066 2,900,000.00 191,400.00
C PERALATAN
D Jumlah A + B + C 510,500.00
E Overhead & Profit 10.0% 51,050.00
F Harga Satuan Pekerjaan (D+E) 561,550.00

7 A.2.3.1.1 Penggalian 1 m3 Tanah Biasa 78,650.00


A TENAGA 71,500.00
Pekerja L.01 OH 0.750 90,000.00 67,500.00
Mandor L.04 OH 0.025 160,000.00 4,000.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 71,500.00
E Overhead & Profit 10.0% 7,150.00
F Harga Satuan Pekerjaan (D+E) 78,650.00

8 A.2.3.1.8 Pembuangan 1 m3 Tanah Bekas galian 34,430.00


A TENAGA 31,300.00
Pekerja L.01 OH 0.330 90,000.00 29,700.00
Mandor L.04 OH 0.010 160,000.00 1,600.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 31,300.00
E Overhead & Profit 10.0% 3,130.00
F Harga Satuan Pekerjaan (D+E) 34,430.00

9 A.2.3.1.9 Pengurugan Kembali 1 m3 Tanah 58,300.00


A TENAGA 53,000.00
Pekerja L.01 OH 0.500 90,000.00 45,000.00
Mandor L.04 OH 0.050 160,000.00 8,000.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 53,000.00
E Overhead & Profit 10.0% 5,300.00
F Harga Satuan Pekerjaan (D+E)/3 58,300.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
10 A.2.3.1.10 Pemadatan Tanah 1 m3 Tanah (per 20 cm) 58,300.00
A TENAGA 53,000.00
Pekerja L.01 OH 0.500 90,000.00 45,000.00
Mandor L.04 OH 0.050 160,000.00 8,000.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 53,000.00
E Overhead & Profit 10.0% 5,300.00
F Harga Satuan Pekerjaan (D+E) 58,300.00

11 A.2.3.1.11 Pengurugan 1 m3 dengan Pasir Urug 216,260.00


A TENAGA 28,600.00
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Mandor L.04 OH 0.010 160,000.00 1,600.00
B BAHAN 168,000.00
Pasir Urug m3 1.200 140,000.00 168,000.00
C PERALATAN
D Jumlah A + B + C 196,600.00
E Overhead & Profit 10.0% 19,660.00
F Harga Satuan Pekerjaan (D+E) 216,260.00

12 A.2.3.1.11 Pengurugan 1 m3 dengan Tanah urug 150,260.00


A Pekerja 28,600.00
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Mandor L.04 OH 0.010 160,000.00 1,600.00
B BAHAN 108,000.00
Tanah Urug m3 1.200 90,000.00 108,000.00
C PERALATAN
D Jumlah A + B + C 136,600.00
E Overhead & Profit 10.0% 13,660.00
F Harga Satuan Pekerjaan (D+E) 150,260.00

13 A.2.3.1.13 Pemasangan 1 m2 lapis ijuk tebal 10 cm untuk bidang resapan 116,490.00


A Pekerja 15,900.00
Pekerja L.01 OH 0.150 90,000.00 13,500.00
Mandor L.04 OH 0.015 160,000.00 2,400.00
B BAHAN 90,000.00
Tanah Urug kg 6.000 15,000.00 90,000.00
C PERALATAN
D Jumlah A + B + C 105,900.00
E Overhead & Profit 10.0% 10,590.00
F Harga Satuan Pekerjaan (D+E) 116,490.00

14 A.3.2.1.9 Pemasangan 1 m3 Batu kosong (anstamping) 433,026.00


A Tenaga A 141,180.00
Pekerja L.01 OH 0.780 90,000.00 70,200.00
Tukang Batu L.02 OH 0.390 150,000.00 58,500.00
Kepala Tukang L.03 OH 0.039 160,000.00 6,240.00
Mandor L.04 OH 0.039 160,000.00 6,240.00
B Bahan B 252,480.00
Batu Kali Belah m3 1.200 160,000.00 192,000.00
Pasir urug m3 0.432 140,000.00 60,480.00
C PERALATAN
D Jumlah A + B + C 393,660.00
E Overhead & Profit 10.0% 39,366.00
F Harga Satuan Pekerjaan (D+E) 433,026.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

15 A.4.4.1.11 Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP 162,904.50
A Tenaga 46,000.00
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang Batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.015 160,000.00 2,400.00
B Bahan 102,095.00
Bata Merah 5 x 11 x 22 Buah 70.000 1,000.00 70,000.00
Portland Semen Kg 8.300 2,450.00 20,335.00
Pasir Pasang m3 0.049 240,000.00 11,760.00
C PERALATAN
D Jumlah A + B + C 148,095.00
E Overhead & Profit 10.0% 14,809.50
F Harga Satuan Pekerjaan (D+E) 162,904.50

16 A.4.4.1.9 Pemasangan 1 m2 Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Batu Camp. 1SP : 4PP 169,944.50
A Tenaga 46,000.00
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang Batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.015 160,000.00 2,400.00
B Bahan 108,495.00
Bata Merah 5 x 11 x 22 Buah 70.000 1,000.00 70,000.00
Portland Semen Kg 11.500 2,450.00 28,175.00
Pasir Pasang m3 0.043 240,000.00 10,320.00
C PERALATAN
D Jumlah A + B + C 154,495.00
E Overhead & Profit 10.0% 15,449.50
F Harga Satuan Pekerjaan (D+E) 169,944.50
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

17 A.3.2.1.4 Pemasangan 1 m3 Pondasi Batu Belah Campuran 1 SP : 6 PP 973,269.00


A Tenaga 271,500.00
Pekerja L.01 OH 1.500 90,000.00 135,000.00
Tukang Batu L.02 OH 0.750 150,000.00 112,500.00
Kepala Tukang Batu L.03 OH 0.075 160,000.00 12,000.00
Mandor L.04 OH 0.075 160,000.00 12,000.00
B Bahan B 613,290.00
Batu Kali Belah m3 1.200 160,000.00 192,000.00
Portland Semen kg 117.000 2,450.00 286,650.00
Pasir Pasang m3 0.561 240,000.00 134,640.00
C PERALATAN
D Jumlah A + B + C 884,790.00
E Overhead & Profit 10.0% 88,479.00
F Harga Satuan Pekerjaan (D+E) 973,269.00

18 A.4.1.1.4 Membuat 1 m3 Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 1,268,439.68
A Tenaga 150,800.00
Pekerja L.01 OH 1.200 90,000.00 108,000.00
Tukang Batu L.02 OH 0.200 150,000.00 30,000.00
Kepala Tukang Batu L.03 OH 0.020 160,000.00 3,200.00
Mandor L.04 OH 0.060 160,000.00 9,600.00
B Bahan 1,002,326.98
Portland Semen Kg 230.000 2,450.00 563,500.00
Pasir Beton kg 893.000 177.78 158,755.56
Kerikil (maksimum 30 mm) kg 1,027.000 214.29 220,071.43
Air ltr 200.000 300.00 60,000.00
C PERALATAN
D Jumlah A + B + C 1,153,126.98
E Overhead & Profit 10.0% 115,312.70
F Harga Satuan Pekerjaan (D+E) 1,268,439.68

19 A.4.1.1.20 Pemasangan 1 m2 Bekisting untuk Pondasi digunakan 3 kali 153,835.00


A Tenaga 94,120.00
Pekerja L.01 OH 0.520 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.260 150,000.00 39,000.00
Kepala Tukang Kayu L.03 OH 0.026 160,000.00 4,160.00
Mandor L.04 OH 0.026 160,000.00 4,160.00
Bahan Digunakan 3 Kali 45,730.00
B
Bahan 137,190.00
Papan kayu bekisting m3 0.040 3,250,000.00 130,000.00
Paku Biasa 2" - 5" Kg 0.300 18,000.00 5,400.00
Minyak Bekisting Ltr 0.100 17,900.00 1,790.00
C PERALATAN
D Jumlah A + B + C 139,850.00
E Overhead & Profit 10.0% 13,985.00
F Harga Satuan Pekerjaan (D+E) 153,835.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

20 A.4.1.1.21 Pemasangan 1 m2 Bekisting untuk Sloof digunakan 3 kali 159,793.33


A Tenaga 94,120.00
Pekerja L.01 OH 0.520 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.260 150,000.00 39,000.00
Kepala Tukang Kayu L.03 OH 0.026 160,000.00 4,160.00
Mandor L.04 OH 0.026 160,000.00 4,160.00
Bahan Digunakan 3 Kali 51,146.67
B
Bahan 153,440.00
Papan kayu bekisting m3 0.045 3,250,000.00 146,250.00
Paku Biasa 2" - 5" Kg 0.300 18,000.00 5,400.00
Minyak Bekisting Ltr 0.100 17,900.00 1,790.00
C PERALATAN
D Jumlah A + B + C 145,266.67
E Overhead & Profit 10.0% 14,526.67
F Harga Satuan Pekerjaan (D+E) 159,793.33

21 SPL A.4.1.1.21 Pemasangan 1 m2 Bekisting untuk Beton Non Struktur (Praktis) digunakan 3 kali 159,793.33
A Tenaga 94,120.00
Pekerja L.01 OH 0.520 90,000.00 46,800.00
Tukang Kayu L.02 OH 0.260 150,000.00 39,000.00
Kepala Tukang Kayu L.03 OH 0.026 160,000.00 4,160.00
Mandor L.04 OH 0.026 160,000.00 4,160.00
Bahan Digunakan 3 Kali 51,146.67
B
Bahan 153,440.00
Papan kayu bekisting m3 0.045 3,250,000.00 146,250.00
Paku Biasa 2" - 5" Kg 0.300 18,000.00 5,400.00
Minyak Bekisting Ltr 0.100 17,900.00 1,790.00
C PERALATAN
D Jumlah A + B + C 145,266.67
E Overhead & Profit 10.0% 14,526.67
F Harga Satuan Pekerjaan (D+E) 159,793.33

22 A.4.1.1.22 Pemasangan 1 m2 Bekisting untuk Kolom digunakan 3 kali 251,683.67


A Tenaga 119,460.00
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 150,000.00 49,500.00
Kepala Tukang Kayu L.03 OH 0.033 160,000.00 5,280.00
Mandor L.04 OH 0.033 160,000.00 5,280.00
Bahan Digunakan 3 Kali 109,343.33
B
Bahan 328,030.00
Papan kayu bekisting m3 0.040 3,250,000.00 130,000.00
Paku Biasa 2" - 5" Kg 0.400 18,000.00 7,200.00
Minyak Bekisting Ltr 0.200 17,900.00 3,580.00
Balok kayu bekisting m3 0.015 2,900,000.00 43,500.00
Kayu Lapis Triplek 122x244x0,9 Lbr 0.350 125,000.00 43,750.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 2.000 50,000.00 100,000.00
C PERALATAN
D Jumlah A + B + C 228,803.33
E Overhead & Profit 10.0% 22,880.33
F Harga Satuan Pekerjaan (D+E) 251,683.67

23 A.4.1.1.23 Pemasangan 1 m2 Bekisting untuk Balok digunakan 3 kali 254,873.67


A Tenaga 119,460.00
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 150,000.00 49,500.00
Kepala Tukang Kayu L.03 OH 0.033 160,000.00 5,280.00
Mandor L.04 OH 0.033 160,000.00 5,280.00
Bahan Digunakan 3 Kali 112,243.33
B
Bahan 336,730.00
Papan kayu bekisting m3 0.040 3,250,000.00 130,000.00
Paku Biasa 2" - 5" Kg 0.400 18,000.00 7,200.00
Minyak Bekisting Ltr 0.200 17,900.00 3,580.00
Balok kayu bekisting m3 0.018 2,900,000.00 52,200.00
Plywood tebal 9mm Lbr 0.350 125,000.00 43,750.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 2.000 50,000.00 100,000.00
C PERALATAN
D Jumlah A + B + C 231,703.33
E Overhead & Profit 10.0% 23,170.33
F Harga Satuan Pekerjaan (D+E) 254,873.67
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

24 A.4.1.1.24 Pemasangan 1 m2 Bekisting untuk Lantai 712,239.00


A Tenaga 119,460.00
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 150,000.00 49,500.00
Kepala Tukang Kayu L.03 OH 0.033 160,000.00 5,280.00
Mandor L.04 OH 0.033 160,000.00 5,280.00
B Bahan 528,030.00
Papan kayu bekisting m3 0.040 3,250,000.00 130,000.00
Paku Biasa 2" - 5" Kg 0.400 18,000.00 7,200.00
Minyak Bekisting Ltr 0.200 17,900.00 3,580.00
Balok kayu bekisting m3 0.015 2,900,000.00 43,500.00
Plywood tebal 9mm Lbr 0.350 125,000.00 43,750.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 6.000 50,000.00 300,000.00
C PERALATAN
D Jumlah A + B + C 647,490.00
E Overhead & Profit 10.0% 64,749.00
F Harga Satuan Pekerjaan (D+E) 712,239.00

25 Taksir Pemasangan 1 m2 Bekisting plastik cor untuk Lantai 12,100.00


A Tenaga -
Pekerja L.01 OH 0.660 - -
Tukang Kayu L.02 OH 0.330 - -
Kepala Tukang Kayu L.03 OH 0.033 - -
Mandor L.04 OH 0.033 - -
B Bahan 11,000.00
Plastik cor terpasang m2 1.100 10,000.00 11,000.00
C PERALATAN
D Jumlah A + B + C 11,000.00
E Overhead & Profit 10.0% 1,100.00
F Harga Satuan Pekerjaan (D+E) 12,100.00

26 A.4.1.1.25 Pemasangan 1 m2 Bekisting untuk dinding digunakan 3 kali 263,417.00


A Tenaga 119,460.00
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 150,000.00 49,500.00
Kepala Tukang Kayu L.03 OH 0.033 160,000.00 5,280.00
Mandor L.04 OH 0.033 160,000.00 5,280.00
B Bahan Digunakan 3 Kali 120,010.00
Bahan 360,030.00
Papan kayu bekisting m3 0.030 3,250,000.00 97,500.00
Paku Biasa 2" - 5" Kg 0.400 18,000.00 7,200.00
Minyak Bekisting Ltr 0.200 17,900.00 3,580.00
Balok kayu bekisting m3 0.020 2,900,000.00 58,000.00
Plywood tebal 9mm Lbr 0.350 125,000.00 43,750.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 3.000 50,000.00 150,000.00
spancer bh 4.000 - -
C PERALATAN
D Jumlah A + B + C 239,470.00
E Overhead & Profit 10.0% 23,947.00
F Harga Satuan Pekerjaan (D+E) 263,417.00

27 A.4.1.1.26 Pemasangan 1 m2 Bekisting untuk tangga digunakan 3 kali 239,438.83


A Tenaga 119,460.00
Pekerja L.01 OH 0.660 90,000.00 59,400.00
Tukang Kayu L.02 OH 0.330 150,000.00 49,500.00
Kepala Tukang Kayu L.03 OH 0.033 160,000.00 5,280.00
Mandor L.04 OH 0.033 160,000.00 5,280.00
B Bahan Digunakan 3 Kali 98,211.67
Bahan 294,635.00
Papan kayu bekisting m3 0.030 3,250,000.00 97,500.00
Paku Biasa 2" - 5" Kg 0.400 18,000.00 7,200.00
Minyak Bekisting Ltr 0.150 17,900.00 2,685.00
Balok kayu bekisting m3 0.015 2,900,000.00 43,500.00
Plywood tebal 9mm Lbr 0.350 125,000.00 43,750.00
Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 2.000 50,000.00 100,000.00
C PERALATAN
D Jumlah A + B + C 217,671.67
E Overhead & Profit 10.0% 21,767.17
F Harga Satuan Pekerjaan (D+E) 239,438.83
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

28 B.27 B Bongkar 1 m2 Bekisting Secara Hati -Hati 6,996.00


A Tenaga 6,360.00
Pekerja L.01 OH 0.060 90,000.00 5,400.00
Mandor L.04 OH 0.006 160,000.00 960.00
B Bahan
C PERALATAN
D Jumlah A + B + C 6,360.00
E Overhead & Profit 10.0% 636.00
F Harga Satuan Pekerjaan (D+E) 6,996.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

29 A.4.1.1.17 Pembesian 10 kg dengan Besi Polos atau Besi Ulir 198,121.00


A Tenaga 18,560.00
Pekerja L.01 OH 0.070 90,000.00 6,300.00
Tukang Besi L.02 OH 0.070 150,000.00 10,500.00
Kepala Tukang Besi L.03 OH 0.007 160,000.00 1,120.00
Mandor L.04 OH 0.004 160,000.00 640.00
B Bahan 161,550.00
Besi Beton (polos/ulir) Kg 10.500 15,000.00 157,500.00
Kawat Beton Kg 0.150 27,000.00 4,050.00
C PERALATAN
D Jumlah A + B + C 180,110.00
E Overhead & Profit 10.0% 18,011.00
F Harga Satuan Pekerjaan (D+E) 198,121.00
G Pembesian 1 Kg Besi Polos Atau Ulir 19,812.10

30 A.4.1.1.19 Pembesian 10 kg jaring kawat baja (wiremesh) 140,305.00


A Tenaga 14,000.00
Pekerja L.01 OH 0.025 90,000.00 2,250.00
Tukang Besi L.02 OH 0.025 150,000.00 3,750.00
Kepala Tukang Besi L.03 OH 0.025 160,000.00 4,000.00
Mandor L.04 OH 0.025 160,000.00 4,000.00
B Bahan 113,550.00
Jaring kawat baja dilas Kg 10.200 11,000.00 112,200.00
Kawat Beton Kg 0.050 27,000.00 1,350.00
C PERALATAN
D Jumlah A + B + C 127,550.00
E Overhead & Profit 10.0% 12,755.00
F Harga Satuan Pekerjaan (D+E) 140,305.00
G Pembesian 1 Kg jaring kawat baja (wiremesh) 14,030.50

31 A.4.1.1.5 Membuat 1 m3 Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66 1,568,953.22
A Tenaga 207,510.00
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala Tukang Batu L.03 OH 0.028 160,000.00 4,480.00
Mandor L.04 OH 0.083 160,000.00 13,280.00
B Bahan 1,218,811.11
Portland Semen Kg 326.000 2,450.00 798,700.00
Pasir Beton Kg 760.000 177.78 135,111.11
Kerikil (maksimum 30 mm) Kg 1,029.000 214.29 220,500.00
Air ltr 215.000 300.00 64,500.00
C PERALATAN
D Jumlah A + B + C 1,426,321.11
E Overhead & Profit 10.0% 142,632.11
F Harga Satuan Pekerjaan (D+E) 1,568,953.22

32 A.4.1.1.7 Membuat 1 m3 Beton mutu f'c=19,3 MPa (K250) 1,682,346.63


A Tenaga 207,510.00
Pekerja L.01 OH 1.650 90,000.00 148,500.00
Tukang Batu L.02 OH 0.275 150,000.00 41,250.00
Kepala Tukang Batu L.03 OH 0.028 160,000.00 4,480.00
Mandor L.04 OH 0.083 160,000.00 13,280.00
B Bahan 1,321,896.03
Portland Semen Kg 371.000 2,450.00 908,950.00
Pasir Beton Kg 698.000 177.78 124,088.89
Kerikil (maksimum 30 mm) Kg 1,047.000 214.29 224,357.14
Air ltr 215.000 300.00 64,500.00
C PERALATAN
D Jumlah A + B + C 1,529,406.03
E Overhead & Profit 10.0% 152,940.60
F Harga Satuan Pekerjaan (D+E) 1,682,346.63
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

33 A.4.4.2.6 Pemasangan 1 m2 Plesteran 1 Pc : 6 Pp Tebal 15 mm 78,759.12


A Tenaga 54,300.00
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang batu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Batu L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.015 160,000.00 2,400.00
B Bahan 17,299.20
Portland Semen Kg 4.416 2,450.00 10,819.20
Pasir Pasang m3 0.027 240,000.00 6,480.00
C PERALATAN
D Jumlah A + B + C 71,599.20
E Overhead & Profit 10.0% 7,159.92
F Harga Satuan Pekerjaan (D+E) 78,759.12

34 A.4.4.2.4 Pemasangan 1 m2 Plesteran 1 Pc : 4 Pp Tebal 15 mm 82,882.80


A Tenaga 54,300.00
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang batu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Batu L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.015 160,000.00 2,400.00
B Bahan 21,048.00
Portland Semen Kg 6.240 2,450.00 15,288.00
Pasir Pasang m3 0.024 240,000.00 5,760.00
C PERALATAN
D Jumlah A + B + C 75,348.00
E Overhead & Profit 10.0% 7,534.80
F Harga Satuan Pekerjaan (D+E) 82,882.80

35 A.4.4.2.3 Pemasangan 1 m2 Plesteran 1 Pc : 3 Pp Tebal 15 mm 86,758.32


A Tenaga 54,300.00
Pekerja L.01 OH 0.300 90,000.00 27,000.00
Tukang batu L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Batu L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.015 160,000.00 2,400.00
B Bahan 24,571.20
Portland Semen Kg 7.776 2,450.00 19,051.20
Pasir Pasang m3 0.023 240,000.00 5,520.00
C PERALATAN
D Jumlah A + B + C 78,871.20
E Overhead & Profit 10.0% 7,887.12
F Harga Satuan Pekerjaan (D+E) 86,758.32

36 A.4.4.2.27 Pemasangan 1 m2 Acian 48,578.75


A Tenaga 36,200.00
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.010 160,000.00 1,600.00
B Bahan 7,962.50
Portland Semen Kg 3.250 2,450.00 7,962.50
C PERALATAN
D Jumlah A + B + C 44,162.50
E Overhead & Profit 10.0% 4,416.25
F Harga Satuan Pekerjaan (D+E) 48,578.75

37 A.4.4.2.20 Pemasangan 1 m' Plesteran Skoning/Tali Air 1 Pc : 2Pp, lebar 10 mm 86,443.50


A Tenaga 74,240.00
Pekerja L.01 OH 0.080 90,000.00 7,200.00
Tukang batu L.02 OH 0.400 150,000.00 60,000.00
Kepala Tukang Batu L.03 OH 0.040 160,000.00 6,400.00
Mandor L.04 OH 0.004 160,000.00 640.00
B Bahan 4,345.00
Portland Semen Kg 0.500 2,450.00 1,225.00
Pasir Pasang m3 0.013 240,000.00 3,120.00
C PERALATAN
D Jumlah A + B + C 78,585.00
E Overhead & Profit 10.0% 7,858.50
F Harga Satuan Pekerjaan (D+E) 86,443.50
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
38 Taksir Pemasangan 1 m2 Langit-langit PVC + rangka Indohyfon 210,000.00
A Tenaga -
Pekerja L.01 OH -
Tukang Besi Konstruksi L.02 OH -
Kepala Tukang Besi konstruksi L.03 OH -
Mandor L.04 OH -
B Bahan 190,909.09
Langit-langit PVC + rangka terpasang merk. Indohyfon m2 1.000 190,909.09 190,909.09
C PERALATAN
D Jumlah A + B + C 190,909.09
E Overhead & Profit 10.0% 19,090.91
F Harga Satuan Pekerjaan (D+E) 210,000.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

39 Taksir Pemasangan 1 m2 ACP Perforated PVDF 1,320,000.00


A Tenaga -
Pekerja L.01 OH -
Tukang Besi Konstruksi L.02 OH -
Kepala Tukang Besi konstruksi L.03 OH -
Mandor L.04 OH -
B Bahan 1,200,000.00
ACP Perforated tebal 4mm, 0,3 pvdf terpasang merk. JIYU m2 1.000 1,200,000.00 1,200,000.00
C PERALATAN
D Jumlah A + B + C 1,200,000.00
E Overhead & Profit 10.0% 120,000.00
F Harga Satuan Pekerjaan (D+E) 1,320,000.00

40 Taksir Pemasangan 1 m2 ACP Glossy PVDF 825,000.00


A Tenaga -
Pekerja L.01 OH -
Tukang Besi Konstruksi L.02 OH -
Kepala Tukang Besi konstruksi L.03 OH -
Mandor L.04 OH -
B Bahan 750,000.00
ACP Glossy tebal 4mm, 0,3 pvdf terpasang merk. JIYU m2 1.000 750,000.00 750,000.00
C PERALATAN
D Jumlah A + B + C 750,000.00
E Overhead & Profit 10.0% 75,000.00
F Harga Satuan Pekerjaan (D+E) 825,000.00

40 SPL A.4.2.1.11 Pemasangan 1 m' Kusen Pintu/Jendela UPVC 247,823.40


A Tenaga 11,344.00
Pekerja L.01 OH 0.043 90,000.00 3,870.00
Tukang Besi Konstruksi L.02 OH 0.043 150,000.00 6,450.00
Kepala Tukang Besi konstruksi L.03 OH 0.0043 160,000.00 688.00
Mandor L.04 OH 0.0021 160,000.00 336.00
B Bahan 213,950.00
Profil UPVC + galvanis m' 1.100 175,000.00 192,500.00
Perlengkapan Hb 0.100 214,500.00 21,450.00
C PERALATAN
D Jumlah A + B + C 225,294.00
E Overhead & Profit 10.0% 22,529.40
F Harga Satuan Pekerjaan (D+E) 247,823.40

41 A.4.2.1.13 Pemasangan 1 m2 Jendela Kaca Rangka UPVC 921,077.30


A Tenaga 22,640.00
Pekerja L.01 OH 0.085 90,000.00 7,650.00
Tukang Besi Konstruksi L.02 OH 0.085 150,000.00 12,750.00
Kepala Tukang Besi konstruksi L.03 OH 0.009 160,000.00 1,440.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 814,703.00
Profil UPVC + galvanis m' 4.400 175,000.00 770,000.00
Profil Kaca m' 4.500 8,500.00 38,250.00
Sealant tube 0.270 23,900.00 6,453.00
C PERALATAN
D Jumlah A + B + C 837,343.00
E Overhead & Profit 10.0% 83,734.30
F Harga Satuan Pekerjaan (D+E) 921,077.30

42 A.4.2.1.13 Pemasangan 1 m2 Pintu Panil UPVC Rangka UPVC 879,002.30


A Tenaga 22,640.00
Pekerja L.01 OH 0.085 90,000.00 7,650.00
Tukang Besi Konstruksi L.02 OH 0.085 150,000.00 12,750.00
Kepala Tukang Besi konstruksi L.03 OH 0.009 160,000.00 1,440.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 776,453.00
Profil UPVC + galvanis m' 4.400 175,000.00 770,000.00
Sealant tube 0.270 23,900.00 6,453.00
C PERALATAN
D Jumlah A + B + C 799,093.00
E Overhead & Profit 10.0% 79,909.30
F Harga Satuan Pekerjaan (D+E) 879,002.30
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
43 A.4.6.2.5 Pemasangan 1 buah Engsel Pintu 166,515.80
A Tenaga 26,378.00
Pekerja L.01 OH 0.015 90,000.00 1,350.00
Tukang Besi Konstruksi L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Besi konstruksi L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.0008 160,000.00 128.00
B Bahan 125,000.00
Engsel Pintu ex. DEKKSON Buah 1.000 125,000.00 125,000.00
C PERALATAN
D Jumlah A + B + C 151,378.00
E Overhead & Profit 10.0% 15,137.80
F Harga Satuan Pekerjaan (D+E) 166,515.80
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

44 SPL A.4.6.2.5a Pemasangan 1 buah Grendel Pintu flush bolt (bawah) 89,515.80
A Tenaga 26,378.00
Pekerja L.01 OH 0.015 90,000.00 1,350.00
Tukang Besi Konstruksi L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Besi konstruksi L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.0008 160,000.00 128.00
B Bahan 55,000.00
Grendel Pintu flush bolt Stainless steel ex. DEKKSON Buah 1.000 55,000.00 55,000.00
C PERALATAN
D Jumlah A + B + C 81,378.00
E Overhead & Profit 10.0% 8,137.80
F Harga Satuan Pekerjaan (D+E) 89,515.80

45 SPL A.4.6.2.5b Pemasangan 1 buah Grendel Pintu flush bolt (atas) 111,515.80
A Tenaga 26,378.00
Pekerja L.01 OH 0.015 90,000.00 1,350.00
Tukang Besi Konstruksi L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Besi konstruksi L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.0008 160,000.00 128.00
B Bahan 75,000.00
Grendel Pintu flush bolt Stainless steel ex. DEKKSON Buah 1.000 75,000.00 75,000.00
C PERALATAN
D Jumlah A + B + C 101,378.00
E Overhead & Profit 10.0% 10,137.80
F Harga Satuan Pekerjaan (D+E) 111,515.80

46 SPL A.4.6.2.5c Pemasangan 1 buah Grendel Pintu Door Bolt 68,615.80


A Tenaga 26,378.00
Pekerja L.01 OH 0.015 90,000.00 1,350.00
Tukang Besi Konstruksi L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Besi konstruksi L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.0008 160,000.00 128.00
B Bahan 36,000.00
Grendel Pintu ,Door Bolt ex. DEKKSON Buah 1.000 36,000.00 36,000.00
C PERALATAN
D Jumlah A + B + C 62,378.00
E Overhead & Profit 10.0% 6,237.80
F Harga Satuan Pekerjaan (D+E) 68,615.80

47 SPL A.4.6.2.6b Pemasangan 1 buah Patch Fitting Pivot PT40 559,130.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 490,000.00
Patch Fitting Pivot PT 40 ex. DEKSSON Buah 1.000 490,000.00 490,000.00
C PERALATAN
D Jumlah A + B + C 508,300.00
E Overhead & Profit 10.0% 50,830.00
F Harga Satuan Pekerjaan (D+E) 559,130.00

48 SPL A.4.6.2.6c Pemasangan 1 buah Patch Fitting Pivot PT30 350,130.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 300,000.00
Patch Fitting Pivot PT 30 ex. DEKSSON Buah 1.000 300,000.00 300,000.00
C PERALATAN
D Jumlah A + B + C 318,300.00
E Overhead & Profit 10.0% 31,830.00
F Harga Satuan Pekerjaan (D+E) 350,130.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

49 SPL A.4.6.2.6d Pemasangan 1 buah Patch Fitting PT20 47,630.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 25,000.00
Patch Fitting PT 20 ex. DEKSSON Buah 10.0% 250,000.00 25,000.00
C PERALATAN
D Jumlah A + B + C 43,300.00
E Overhead & Profit 10% 4,330.00
F Harga Satuan Pekerjaan (D+E) 47,630.00

49 SPL A.4.6.2.6e Pemasangan 1 buah Bottom Patch Fitting PT10 350,130.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 300,000.00
Bottom Patch Fitting PT 10 ex. DEKSSON Buah 1.000 300,000.00 300,000.00
C PERALATAN
D Jumlah A + B + C 318,300.00
E Overhead & Profit 10.0% 31,830.00
F Harga Satuan Pekerjaan (D+E) 350,130.00

50 SPL A.4.6.2.6f Pemasangan 1 buah Patch Lock US10 + Cylinder PT10 625,130.00
A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 550,000.00
Patch Lock US 10 + Cylinder PT 10 ex. DEKSSON Buah 1.000 550,000.00 550,000.00
C PERALATAN
D Jumlah A + B + C 568,300.00
E Overhead & Profit 10.0% 56,830.00
F Harga Satuan Pekerjaan (D+E) 625,130.00

51 SPL A.4.6.2.6g Pemasangan 1 buah Top Fitting 24 64,130.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 40,000.00
Top Fitting PT 24 ex. DEKSSON Buah 1.000 40,000.00 40,000.00
C PERALATAN
D Jumlah A + B + C 58,300.00
E Overhead & Profit 10.0% 5,830.00
F Harga Satuan Pekerjaan (D+E) 64,130.00

52 SPL A.4.6.2.6h Pemasangan 1 buah Floor hinge 955,130.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 850,000.00
Floor Hinge ex. DEKSSON Buah 1.000 850,000.00 850,000.00
C PERALATAN
D Jumlah A + B + C 868,300.00
E Overhead & Profit 10.0% 86,830.00
F Harga Satuan Pekerjaan (D+E) 955,130.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

53 A.4.6.2.6a Pemasangan 1 buah Engsel Jendela Boven Friction stay/ Casement 12" 112,530.00
A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 84,000.00
Engsel jendela casement 12" ex. DEKKSON Buah 1.000 84,000.00 84,000.00
C PERALATAN
D Jumlah A + B + C 102,300.00
E Overhead & Profit 10.0% 10,230.00
F Harga Satuan Pekerjaan (D+E) 112,530.00

54 A.4.6.2.6b Pemasangan 1 buah Engsel Jendela Friction stay /Casement 16" 169,730.00
A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 136,000.00
Engsel jendela casement 16" ex. DEKKSON Buah 1.000 136,000.00 136,000.00
C PERALATAN
D Jumlah A + B + C 154,300.00
E Overhead & Profit 10.0% 15,430.00
F Harga Satuan Pekerjaan (D+E) 169,730.00

55 SPL A.4.6.2.6a Pemasangan 1 buah Gerendel Jendela Rambuncis 36,630.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 15,000.00
Grendel Jendela Rambuncis ex. DEKKSON Buah 1.000 15,000.00 15,000.00
C PERALATAN
D Jumlah A + B + C 33,300.00
E Overhead & Profit 10.0% 3,330.00
F Harga Satuan Pekerjaan (D+E) 36,630.00

56 A.4.6.2.10 Pasang 1 buah Door Closer 327,778.00


A Tenaga 87,980.00
Pekerja L.01 OH 0.050 90,000.00 4,500.00
Tukang Besi Konstruksi L.02 OH 0.500 150,000.00 75,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.050 160,000.00 8,000.00
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 210,000.00
Door closer ex.DEKKSON Buah 1.000 210,000.00 210,000.00
C PERALATAN
D Jumlah A + B + C 297,980.00
E Overhead & Profit 10.0% 29,798.00
F Harga Satuan Pekerjaan (D+E) 327,778.00

57 A.4.6.2.11 Pemasangan 1 buah cylinder lock untuk pintu aluminium 130,526.00


A Tenaga 35,160.00
Pekerja L.01 OH 0.020 90,000.00 1,800.00
Tukang Besi Konstruksi L.02 OH 0.200 150,000.00 30,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.020 160,000.00 3,200.00
Mandor L.04 OH 0.001 160,000.00 160.00
B Bahan 83,500.00
cylinder door lock ex. DEKKSON Buah 1.000 83,500.00 83,500.00
C PERALATAN
D Jumlah A + B + C 118,660.00
E Overhead & Profit 10.0% 11,866.00
F Harga Satuan Pekerjaan (D+E) 130,526.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

58 SPL A.4.6.2.11 Pemasangan 1 bh mortise untuk pintu aluminum 258,676.00


A Tenaga 35,160.00
Pekerja L.01 OH 0.020 90,000.00 1,800.00
Tukang Besi Konstruksi L.02 OH 0.200 150,000.00 30,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.020 160,000.00 3,200.00
Mandor L.04 OH 0.001 160,000.00 160.00
B Bahan 200,000.00
Mortise ex. DEKKSON Set 1.000 200,000.00 200,000.00
C PERALATAN
D Jumlah A + B + C 235,160.00
E Overhead & Profit 10.0% 23,516.00
F Harga Satuan Pekerjaan (D+E) 258,676.00

59 SPL A.4.6.2.12a Pemasangan 1 psg Pull Handle 45 cm 557,678.00


A Tenaga 87,980.00
Pekerja L.01 OH 0.050 90,000.00 4,500.00
Tukang Besi Konstruksi L.02 OH 0.500 150,000.00 75,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.050 160,000.00 8,000.00
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 419,000.00
Pull Handle 45 cm ex. DEKKSON psg 1.000 419,000.00 419,000.00
C PERALATAN
D Jumlah A + B + C 506,980.00
E Overhead & Profit 10.0% 50,698.00
F Harga Satuan Pekerjaan (D+E) 557,678.00

60 SPL A.4.6.2.12b Pemasangan 1 psg Pull Handle Alluminum 140,778.00


A Tenaga 87,980.00
Pekerja L.01 OH 0.050 90,000.00 4,500.00
Tukang Besi Konstruksi L.02 OH 0.500 150,000.00 75,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.050 160,000.00 8,000.00
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 40,000.00
Pull Handle Aluminum ex. NKM psg 1.000 40,000.00 40,000.00
C PERALATAN
D Jumlah A + B + C 127,980.00
E Overhead & Profit 10.0% 12,798.00
F Harga Satuan Pekerjaan (D+E) 140,778.00

61 SPL A.4.6.2.12c Pemasangan 1 psg Handle 278,278.00


A Tenaga 87,980.00
Pekerja L.01 OH 0.050 90,000.00 4,500.00
Tukang Besi Konstruksi L.02 OH 0.500 150,000.00 75,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.050 160,000.00 8,000.00
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 165,000.00
Handle ex. DEKKSON psg 1.000 165,000.00 165,000.00
C PERALATAN
D Jumlah A + B + C 252,980.00
E Overhead & Profit 10.0% 25,298.00
F Harga Satuan Pekerjaan (D+E) 278,278.00

62 A.4.6.2.13 Pemasangan 1 buah Door Stop 97,130.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Besi Konstruksi L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Besi konstruksi L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 70,000.00
Door Stoper pintu ex DEKKSON Buah 1.000 70,000.00 70,000.00
C PERALATAN
D Jumlah A + B + C 88,300.00
E Overhead & Profit (contoh 10%) 10.0% 8,830.00
F Harga Satuan Pekerjaan (D+E) 97,130.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

63 A.4.6.2.17b Pemasangan 1 m2 Kaca Bening tebal 5 mm 333,356.10


A Tenaga 26,378.00
Pekerja L.01 OH 0.015 90,000.00 1,350.00
Tukang Besi Konstruksi L.02 OH 0.150 150,000.00 22,500.00
Kepala Tukang Besi konstruksi L.03 OH 0.015 160,000.00 2,400.00
Mandor L.04 OH 0.0008 160,000.00 128.00
B Bahan 276,673.00
Kaca Bening tebal 5mm m2 1.100 250,000.00 275,000.00
Sealant tube 0.070 23,900.00 1,673.00
C PERALATAN
D Jumlah A + B + C 303,051.00
E Overhead & Profit (contoh 10%) 10.0% 30,305.10
F Harga Satuan Pekerjaan (D+E) 333,356.10

64 taksir Pemasangan 1 unit daun pintu/jendela HDF 990,000.00


A Tenaga -
Pekerja L.01 OH - 90,000.00 -
Tukang Besi Konstruksi L.02 OH - 150,000.00 -
Kepala Tukang Besi konstruksi L.03 OH - 160,000.00 -
Mandor L.04 OH - 160,000.00 -
B Bahan 900,000.00
Daun pintu HDF unit 1.000 900,000.00 900,000.00

C PERALATAN
D Jumlah A + B + C 900,000.00
E Overhead & Profit (contoh 10%) 10.0% 90,000.00
F Harga Satuan Pekerjaan (D+E) 990,000.00

65 A.4.6.2.19c Pemasangan 1 m2 kaca tempered 12mm 606,794.10


A Tenaga 43,958.00
Pekerja L.01 OH 0.025 90,000.00 2,250.00
Tukang Besi Konstruksi L.02 OH 0.250 150,000.00 37,500.00
Kepala Tukang Besi konstruksi L.03 OH 0.025 160,000.00 4,000.00
Mandor L.04 OH 0.0013 160,000.00 208.00
B Bahan 507,673.00
Kaca Tempered 12 mm m2 1.100 460,000.00 506,000.00
Sealant tube 0.070 23,900.00 1,673.00
C PERALATAN
D Jumlah A + B + C 551,631.00
E Overhead & Profit (contoh 10%) 10.0% 55,163.10
F Harga Satuan Pekerjaan (D+E) 606,794.10

66 Hitung Mengerjakan Pintu Jendela Type PJ1 30,318,246.04


Pemasangan 1 m2 kaca tempered 12mm m2 23.550 606,794.10 14,290,001.06
Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 39.700 247,823.40 9,838,588.98
Pemasangan 1 buah Patch Fitting Pivot PT40 bh 2.000 559,130.00 1,118,260.00
Pemasangan 1 buah Patch Fitting PT20 bh 2.000 47,630.00 95,260.00
Pemasangan 1 buah Bottom Patch Fitting PT10 bh 2.000 350,130.00 700,260.00
Pemasangan 1 buah Patch Lock US10 + Cylinder PT10 bh 2.000 625,130.00 1,250,260.00
Pemasangan 1 buah Floor hinge bh 2.000 955,130.00 1,910,260.00
Pemasangan 1 psg Pull Handle 45 cm psg 2.000 557,678.00 1,115,356.00
Harga Satuan Pekerjaan 30,318,246.04

67 Hitung Mengerjakan Pintu Jendela Type PJ2 22,462,225.61


Pemasangan 1 m2 kaca tempered 12mm m2 15.300 606,794.10 9,283,949.73
Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 28.200 247,823.40 6,988,619.88
Pemasangan 1 buah Patch Fitting Pivot PT40 bh 2.000 559,130.00 1,118,260.00
Pemasangan 1 buah Patch Fitting PT20 bh 2.000 47,630.00 95,260.00
Pemasangan 1 buah Bottom Patch Fitting PT10 bh 2.000 350,130.00 700,260.00
Pemasangan 1 buah Patch Lock US10 + Cylinder PT10 bh 2.000 625,130.00 1,250,260.00
Pemasangan 1 buah Floor hinge bh 2.000 955,130.00 1,910,260.00
Pemasangan 1 psg Pull Handle 45 cm psg 2.000 557,678.00 1,115,356.00
Harga Satuan Pekerjaan 22,462,225.61

68 Hitung Mengerjakan Pintu Type P1 4,879,504.79


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 6.960 247,823.40 1,724,850.86
Pemasangan 1 m2 daun pintu/jendela HDF unit 1.000 990,000.00 990,000.00
Pemasangan 1 m2 Jendela Kaca Rangka UPVC m2 0.315 921,077.30 290,139.35
Pemasangan 1 m2 Kaca Bening tebal 5 mm m2 0.148 333,356.10 49,403.37
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
Pemasangan 1 buah Engsel Pintu bh 3.000 166,515.80 499,547.40
Pemasangan 1 buah Engsel Jendela Boven Friction stay/ Casement 1 bh 2.000 112,530.00 225,060.00
Pemasangan 1 bh mortise untuk pintu aluminum bh 1.000 258,676.00 258,676.00
Pemasangan 1 psg Handle psg 1.000 278,278.00 278,278.00
Pemasangan 1 buah cylinder lock bh 1.000 130,526.00 130,526.00
Pemasangan 1 buah Gerendel Jendela Rambuncis bh 1.000 36,630.00 36,630.00
Pemasangan 1 buah Grendel Pintu Door Bolt bh 1.000 68,615.80 68,615.80
Pasang 1 buah Door Closer bh 1.000 327,778.00 327,778.00
Harga Satuan Pekerjaan 4,879,504.79
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

69 Hitung Mengerjakan Pintu Type P2 8,820,675.33


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 7.560 247,823.40 1,873,544.90
Pemasangan 1 m2 Jendela Kaca Rangka UPVC m2 2.904 921,077.30 2,674,808.48
Pemasangan 1 m2 Kaca Bening tebal 5 mm m2 1.942 333,356.10 647,377.55
Pemasangan 1 psg Pull Handle 45 cm psg 2.000 557,678.00 1,115,356.00
Pemasangan 1 buah Engsel Pintu bh 6.000 166,515.80 999,094.80
Pemasangan 1 buah Engsel Jendela Boven Friction stay/ Casement 1 bh 4.000 112,530.00 450,120.00
Pemasangan 1 buah cylinder lock untuk pintu aluminium bh 1.000 130,526.00 130,526.00
Pemasangan 1 buah Gerendel Jendela Rambuncis bh 2.000 36,630.00 73,260.00
Pemasangan 1 buah Grendel Pintu flush bolt (atas) bh 1.000 111,515.80 111,515.80
Pemasangan 1 buah Grendel Pintu flush bolt (bawah) bh 1.000 89,515.80 89,515.80
Pasang 1 buah Door Closer bh 2.000 327,778.00 655,556.00
Harga Satuan Pekerjaan 8,820,675.33

70 Hitung Mengerjakan Pintu Jendela Type P3 9,057,023.49


Pemasangan 1 m2 kaca tempered 12mm m2 2.520 606,794.10 1,529,121.13
Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 5.400 247,823.40 1,338,246.36
Pemasangan 1 buah Patch Fitting Pivot PT40 bh 2.000 559,130.00 1,118,260.00
Pemasangan 1 buah Patch Fitting PT20 bh 2.000 47,630.00 95,260.00
Pemasangan 1 buah Bottom Patch Fitting PT10 bh 2.000 350,130.00 700,260.00
Pemasangan 1 buah Patch Lock US10 + Cylinder PT10 bh 2.000 625,130.00 1,250,260.00
Pemasangan 1 buah Floor hinge bh 2.000 955,130.00 1,910,260.00
Pemasangan 1 psg Pull Handle 45 cm psg 2.000 557,678.00 1,115,356.00
Harga Satuan Pekerjaan 9,057,023.49

71 Hitung Mengerjakan Pintu Type P4 3,079,796.41


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 5.180 247,823.40 1,283,725.21
Pemasangan 1 m2 daun pintu/jendela HDF unit 1.000 990,000.00 990,000.00
Pemasangan 1 buah Engsel Pintu bh 3.000 166,515.80 499,547.40
Pemasangan 1 psg Pull Handle Alluminum set 1.000 140,778.00 140,778.00
Pemasangan 1 buah Grendel Pintu Door Bolt bh 1.000 68,615.80 68,615.80
Pemasangan 1 buah Door Stop bh 1.000 97,130.00 97,130.00
Harga Satuan Pekerjaan 3,079,796.41

72 Hitung Mengerjakan Pintu Type P5 2,910,249.01


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 5.180 247,823.40 1,283,725.21
Pemasangan 1 m2 daun pintu/jendela HDF unit 1.000 990,000.00 990,000.00
Rel pintu sorong/ geser track 2m ex. DEKKSON unit 1.000 330,000.00 330,000.00
Pemasangan 1 psg Pull Handle Alluminum set 1.000 140,778.00 140,778.00
Pemasangan 1 buah Grendel Pintu Door Bolt bh 1.000 68,615.80 68,615.80
Pemasangan 1 buah Door Stop bh 1.000 97,130.00 97,130.00
Harga Satuan Pekerjaan 2,910,249.01

73 Hitung Mengerjakan Jendela Type J1 6,658,379.55


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 11.810 247,823.40 2,926,794.35
Pemasangan 1 m2 Jendela Kaca Rangka UPVC m2 1.760 921,077.30 1,621,096.05
Pemasangan 1 m2 Kaca Bening tebal 5 mm m2 1.720 333,356.10 573,239.15
Pemasangan 1 buah Engsel Jendela Boven Friction stay/ Casement 1 bh 6.000 112,530.00 675,180.00
Pemasangan 1 buah Engsel Jendela Friction stay /Casement 16" bh 4.000 169,730.00 678,920.00
Pemasangan 1 buah Gerendel Jendela Rambuncis bh 5.000 36,630.00 183,150.00
Harga Satuan Pekerjaan 6,658,379.55

75 Hitung Mengerjakan Jendela Type J2 5,166,937.95


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 8.460 247,823.40 2,096,585.96
Pemasangan 1 m2 Jendela Kaca Rangka UPVC m2 1.580 921,077.30 1,455,302.13
Pemasangan 1 m2 Kaca Bening tebal 5 mm m2 1.018 333,356.10 339,489.85
Pemasangan 1 buah Engsel Jendela Boven Friction stay/ Casement 1 bh 4.000 112,530.00 450,120.00
Pemasangan 1 buah Engsel Jendela Friction stay /Casement 16" bh 4.000 169,730.00 678,920.00
Pemasangan 1 buah Gerendel Jendela Rambuncis bh 4.000 36,630.00 146,520.00
Harga Satuan Pekerjaan 5,166,937.95

76 Hitung Mengerjakan Jendela Type J3 2,808,988.27


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 5.140 247,823.40 1,273,812.28
Pemasangan 1 m2 Jendela Kaca Rangka UPVC m2 0.790 921,077.30 727,651.07
Pemasangan 1 m2 Kaca Bening tebal 5 mm m2 0.509 333,356.10 169,744.93
Pemasangan 1 buah Engsel Jendela Boven Friction stay/ Casement 1 bh 2.000 112,530.00 225,060.00
Pemasangan 1 buah Engsel Jendela Friction stay /Casement 16" bh 2.000 169,730.00 339,460.00
Pemasangan 1 buah Gerendel Jendela Rambuncis bh 2.000 36,630.00 73,260.00
Harga Satuan Pekerjaan 2,808,988.27
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

74 Hitung Mengerjakan Jendela Type J4 4,753,857.13


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 8.840 247,823.40 2,190,758.86
Pemasangan 1 m2 kaca tempered 12mm m2 4.224 606,794.10 2,563,098.28
Harga Satuan Pekerjaan 4,753,857.13

75 Hitung Mengerjakan Boven BV 2,237,733.01


Pemasangan 1 m' Kusen Pintu/Jendela UPVC m' 4.550 247,823.40 1,127,596.47
Pemasangan 1 m2 Jendela Kaca Rangka UPVC m2 0.533 921,077.30 490,749.99
Pemasangan 1 m2 Kaca Bening tebal 5 mm m2 0.288 333,356.10 96,006.56
Pemasangan 1 buah Engsel Jendela Boven Friction stay/ Casement 1 bh 4.000 112,530.00 450,120.00
Pemasangan 1 buah Gerendel Jendela Rambuncis bh 2.000 36,630.00 73,260.00
Harga Satuan Pekerjaan 2,237,733.01

76 SPL.A.4.4.3.10a Pemasangan 1 m2 lantai granit polised Uk. 60 x60 cm 391,952.00


A Tenaga 45,410.00
Pekerja L.01 OH 0.250 90,000.00 22,500.00
Tukang Batu L.02 OH 0.125 150,000.00 18,750.00
Kepala Tukang L.03 OH 0.013 160,000.00 2,080.00
Mandor L.04 OH 0.013 160,000.00 2,080.00
B Bahan 310,910.00
Ubin granit m2 1.100 225,000.00 247,500.00
Portland Semen Kg 9.800 2,450.00 24,010.00
Semen warna Kg 1.300 22,000.00 28,600.00
Pasir Pasang m3 0.045 240,000.00 10,800.00
C PERALATAN
D Jumlah A + B + C 356,320.00
E Overhead & Profit 10.0% 35,632.00
F Harga Satuan Pekerjaan (D+E) 391,952.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

77 SPL.A.4.4.3.10b Pemasangan 1 m2 lantai granit unpolised Uk. 60 x60 cm 434,302.00


A Tenaga 45,410.00
Pekerja L.01 OH 0.250 90,000.00 22,500.00
Tukang Batu L.02 OH 0.125 150,000.00 18,750.00
Kepala Tukang L.03 OH 0.013 160,000.00 2,080.00
Mandor L.04 OH 0.013 160,000.00 2,080.00
B Bahan 349,410.00
Ubin granit m2 1.100 260,000.00 286,000.00
Portland Semen Kg 9.800 2,450.00 24,010.00
Semen warna Kg 1.300 22,000.00 28,600.00
Pasir Pasang m3 0.045 240,000.00 10,800.00
C PERALATAN
D Jumlah A + B + C 394,820.00
E Overhead & Profit 10.0% 39,482.00
F Harga Satuan Pekerjaan (D+E) 434,302.00

78 SPL.A.4.4.3.10c Pemasangan 1 m2 dinding granit polised Uk. 30 x60 cm 434,302.00


A Tenaga 45,410.00
Pekerja L.01 OH 0.250 90,000.00 22,500.00
Tukang Batu L.02 OH 0.125 150,000.00 18,750.00
Kepala Tukang L.03 OH 0.013 160,000.00 2,080.00
Mandor L.04 OH 0.013 160,000.00 2,080.00
B Bahan 349,410.00
Ubin granit m2 1.100 260,000.00 286,000.00
Portland Semen Kg 9.800 2,450.00 24,010.00
Semen warna Kg 1.300 22,000.00 28,600.00
Pasir Pasang m3 0.045 240,000.00 10,800.00
C PERALATAN
D Jumlah A + B + C 394,820.00
E Overhead & Profit 10.0% 39,482.00
F Harga Satuan Pekerjaan (D+E) 434,302.00

79 A.4.4.3.39a Pemasangan 1 m Stepnousing Uk. 8 x 60 cm 52,941.90


A Tenaga 28,000.00
Pekerja L.01 OH 0.090 90,000.00 8,100.00
Tukang Batu L.02 OH 0.090 150,000.00 13,500.00
Kepala Tukang L.03 OH 0.035 160,000.00 5,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 20,129.00
Stepnousing uk 8 x 60 bh 1.667 10,000.00 16,670.00
Portland Semen Kg 1.140 2,450.00 2,793.00
Semen warna Kg 0.003 22,000.00 66.00
Pasir Pasang m3 0.003 240,000.00 600.00
C PERALATAN
D Jumlah A + B + C 48,129.00
E Overhead & Profit 10.0% 4,812.90
F Harga Satuan Pekerjaan (D+E) 52,941.90

80 A.4.4.3.39b Pemasangan 1 m hospital plin 10 x 60 x 4 153,795.40


A Tenaga 28,000.00
Pekerja L.01 OH 0.090 90,000.00 8,100.00
Tukang Batu L.02 OH 0.090 150,000.00 13,500.00
Kepala Tukang L.03 OH 0.035 160,000.00 5,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 111,814.00
Hospital Plin 10 x 60 x 4 bh 1.667 65,000.00 108,355.00
Portland Semen Kg 1.140 2,450.00 2,793.00
Semen warna Kg 0.003 22,000.00 66.00
Pasir Pasang m3 0.003 240,000.00 600.00
C PERALATAN
D Jumlah A + B + C 139,814.00
E Overhead & Profit 10.0% 13,981.40
F Harga Satuan Pekerjaan (D+E) 153,795.40

81 A.4.4.3.39b Pemasangan 1 m Plin 10 x 60 sekualitas NIRRO 52,941.90


A Tenaga 28,000.00
Pekerja L.01 OH 0.090 90,000.00 8,100.00
Tukang Batu L.02 OH 0.090 150,000.00 13,500.00
Kepala Tukang L.03 OH 0.035 160,000.00 5,600.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 20,129.00
Hospital Plin 10 x 60 x 4 bh 1.667 10,000.00 16,670.00
Portland Semen Kg 1.140 2,450.00 2,793.00
Semen warna Kg 0.003 22,000.00 66.00
Pasir Pasang m3 0.003 240,000.00 600.00
C PERALATAN
D Jumlah A + B + C 48,129.00
E Overhead & Profit 10.0% 4,812.90
F Harga Satuan Pekerjaan (D+E) 52,941.90

112 Hitung Mengerjakan 1 m' Railing Dinding Pipa Stainless Steel 41,866.11
Akseories Railing 15% harga bahan (perkuatan dengan baut) ls 1.000 5,275.00 5,275.00
Pipa Stainless Steel 2" m 1.000 35,166.67 35,166.67
Pengelasan 1cm las listrik (titik) cm 0.377 3,778.45 1,424.44
Harga Satuan Pekerjaan 41,866.11

113 A.4.2.1.5 Pengerjaan 1 cm Pengelasan dengan Las Listrik 3,778.45


A.4.2.1.5 Pengerjaan 10 cm Pengelasan dengan Las Listrik 37,784.45
A Tenaga 7,240.00
Pekerja L.01 OH 0.040 90,000.00 3,600.00
Tukang Besi L.02 OH 0.020 150,000.00 3,000.00
Kepala Tukang L.03 OH 0.002 160,000.00 320.00
Mandor L.04 OH 0.002 160,000.00 320.00
B Bahan 1,609.50
Kawat Las kg 0.040 31,000.00 1,240.00
Solar ltr 0.030 8,050.00 241.50
Minyak Pelumas ltr 0.004 32,000.00 128.00
C PERALATAN 25,500
Sewa Alat jam 0.170 150,000 25,500
D Jumlah A + B + C 34,349.50
E Overhead & Profit (contoh 10%) 10.0% 3,434.95
F Harga Satuan Pekerjaan (D+E) 37,784.45

114 A.4.6.1.21 Pemasangan 1 m' Listplank Kalsiplang 67,430.00


A Tenaga 43,000.00
Pekerja L.01 OH 0.100 90,000.00 9,000.00
Tukang Kayu L.02 OH 0.200 150,000.00 30,000.00
Kepala Tukang Kayu L.03 OH 0.020 160,000.00 3,200.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 18,300.00
Listplank Kalsiplang m' 1.100 15,000.00 16,500.00
Paku Biasa 2" - 5" Kg 0.100 18,000.00 1,800.00
C PERALATAN
D Jumlah A + B + C 61,300.00
E Overhead & Profit 10.0% 6,130.00
F Harga Satuan Pekerjaan (D+E) 67,430.00

115 Taksir Pemasangan 1 m2 Rangka atap baja ringan 220,000.00


A Tenaga -
Pekerja L.01 OH - 90,000.00 -
Tukang Besi L.02 OH - 150,000.00 -
Kepala Tukang Besi L.03 OH - 160,000.00 -
Mandor L.04 OH - 160,000.00 -
B Bahan 200,000.00
Rangka atap baja ringan m2 1.000 200,000.00 200,000.00
C PERALATAN
D Jumlah A + B + C 200,000.00
E Overhead & Profit 10.0% 20,000.00
F Harga Satuan Pekerjaan (D+E) 220,000.00

116 Taksir Pemasangan 1 m2 Atap Genteng bitumen (Onduvilla) 312,251.50


A Tenaga 36,200.00
Pekerja L.01 OH 0.200 90,000.00 18,000.00
Tukang Kayu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang Kayu L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.010 160,000.00 1,600.00
B Bahan 247,665.00
Genteng Onduvilla lbr 3.724 60,000.00 223,440.00
Paku skrup bh 16.150 1,500.00 24,225.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
C PERALATAN
D Jumlah A + B + C 283,865.00
E Overhead & Profit 10.0% 28,386.50
F Harga Satuan Pekerjaan (D+E) 312,251.50

117 Taksir Pemasangan 1 m' Bubungan Onduvilla 188,540.00


A Tenaga 34,790.00
Pekerja L.01 OH 0.084 90,000.00 7,560.00
Tukang Kayu L.02 OH 0.125 150,000.00 18,750.00
Kepala Tukang Kayu L.03 OH 0.013 160,000.00 2,080.00
Mandor L.04 OH 0.040 160,000.00 6,400.00
B Bahan B 136,610.00
Bubungan Onduvilla m' 1.438 95,000.00 136,610.00
Paku skrup bh 11.504 1,500.00 17,256.00
C PERALATAN
D Jumlah A + B + C 171,400.00
E Overhead & Profit 10.0% 17,140.00
F Harga Satuan Pekerjaan (D+E) 188,540.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

118 A.4.7.1.10a Pengecatan 1 m2 Tembok Baru mutu menengah (1 lap.Plamir, 1 lap Cat Dasar 2 lap. Cat Penutup) Dalam Ruan 44,997.15
A Tenaga 12,706.50
Pekerja L.01 OH 0.020 90,000.00 1,800.00
Tukang Cat L.02 OH 0.063 150,000.00 9,450.00
Kepala Tukang Cat L.03 OH 0.006 155,000.00 976.50
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 28,200.00
Plamir Kg 0.100 30,000.00 3,000.00
Cat Dasar Kg 0.100 70,000.00 7,000.00
Cat Penutup 2 kali Kg 0.260 70,000.00 18,200.00
C PERALATAN
D Jumlah A + B + C 40,906.50
E Overhead & Profit 10.0% 4,090.65
F Harga Satuan Pekerjaan (D+E) 44,997.15

119 A.4.7.1.10b Pengecatan 1 m2 Tembok Baru mutu menegah (1 lap.Plamir, 1 lap Cat Dasar 2 lap. Cat Penutup) Luar Ruangan 44,997.15
A Tenaga 12,706.50
Pekerja L.01 OH 0.020 90,000.00 1,800.00
Tukang Cat L.02 OH 0.063 150,000.00 9,450.00
Kepala Tukang Cat L.03 OH 0.006 155,000.00 976.50
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 28,200.00
Plamir Kg 0.100 30,000.00 3,000.00
Cat Dasar Kg 0.100 70,000.00 7,000.00
Cat Penutup 2 kali eksterior Kg 0.260 70,000.00 18,200.00
C PERALATAN
D Jumlah A + B + C 40,906.50
E Overhead & Profit 10.0% 4,090.65
F Harga Satuan Pekerjaan (D+E) 44,997.15

120 A.4.7.1.10c Pengecatan 1 m2 Wateprofing 34,217.15


A Tenaga 12,706.50
Pekerja L.01 OH 0.020 90,000.00 1,800.00
Tukang Cat L.02 OH 0.063 150,000.00 9,450.00
Kepala Tukang Cat L.03 OH 0.006 155,000.00 976.50
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 18,400.00
Cat Dasar Kg 0.200 40,000.00 8,000.00
Cat Penutup 2 kali eksterior Kg 0.260 40,000.00 10,400.00
C PERALATAN
D Jumlah A + B + C 31,106.50
E Overhead & Profit 10.0% 3,110.65
F Harga Satuan Pekerjaan (D+E) 34,217.15

120 A.4.7.1.10f Pengecat 1 m2 besi (1 lap.Plamir, 1 lap Cat Dasar 2 lap. Cat Penutup) Merk EMCO 43,843.80
A Tenaga 12,738.00
Pekerja L.01 OH 0.020 90,000.00 1,800.00
Tukang Cat L.02 OH 0.063 150,000.00 9,450.00
Kepala Tukang Cat L.03 OH 0.006 160,000.00 1,008.00
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 27,120.00
Meni Kg 0.100 30,000 3,000.00
Cat Dasar Kg 0.100 67,000.00 6,700.00
Cat Penutup 2 kali (EMCO ) Kg 0.260 67,000.00 17,420.00
C PERALATAN
D Jumlah A + B + C 39,858.00
E Overhead & Profit 10.0% 3,985.80
F Harga Satuan Pekerjaan (D+E) 43,843.80

121 A.5.1.1.35 1 m' Memasang Pipa/Buis Beton U-20 169,943.40


A Tenaga 25,340.00
Pekerja L.01 OH 0.140 90,000.00 12,600.00
Tukang batu L.02 OH 0.070 150,000.00 10,500.00
Kepala Tukang Batu L.03 OH 0.007 160,000.00 1,120.00
Mandor L.04 OH 0.007 160,000.00 1,120.00
B Bahan 129,154.00
Pipa Beton/ U 20 bh 1.100 75,000.00 82,500.00
Batu Bata m3 0.027 750,000.00 20,250.00
Portland Semen kg 3.920 2,450.00 9,604.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
Pasir Pasang m3 0.056 240,000.00 13,440.00
Pasir Urug m3 0.024 140,000.00 3,360.00
C PERALATAN
D Jumlah A + B + C 154,494.00
E Overhead & Profit 10.0% 15,449.40
F Harga Satuan Pekerjaan (D+E) 169,943.40
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

122 A.5.1.1.16 Pemasangan 1 buah Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm 886,897.00
A Tenaga 464,820.00
Pekerja L.01 OH 3.200 90,000.00 288,000.00
Tukang Batu L.02 OH 1.150 150,000.00 172,500.00
Kepala Tukang Batu L.03 OH 0.011 160,000.00 1,760.00
Mandor L.04 OH 0.016 160,000.00 2,560.00
B Bahan 341,450.00
Batu Bata bh 70.000 1,000.00 70,000.00
Semen Portland kg 77.000 2,450.00 188,650.00
Pasir Pasang m3 0.130 240,000.00 31,200.00
Pasir Beton m3 0.090 240,000.00 21,600.00
Kerikil m3 0.020 300,000.00 6,000.00
Baja Tulangan kg 1.600 15,000.00 24,000.00
C PERALATAN
D Jumlah A + B + C 806,270.00
E Overhead & Profit 10.0% 80,627.00
F Harga Satuan Pekerjaan (D+E) 886,897.00

123 A.5.1.1.17 Pemasangan 1 buah Bak Kontrol Pas.Batu Bata 60 x 60 tinggi 65 cm 1,125,003.00
A Tenaga 464,820.00
Pekerja L.01 OH 3.200 90,000.00 288,000.00
Tukang Batu L.02 OH 1.150 150,000.00 172,500.00
Kepala Tukang Batu L.03 OH 0.011 160,000.00 1,760.00
Mandor L.04 OH 0.016 160,000.00 2,560.00
B Bahan 557,910.00
Batu Bata bh 123.000 1,000.00 123,000.00
Semen Portland kg 114.000 2,450.00 279,300.00
Pasir Pasang m3 0.184 240,000.00 44,160.00
Pasir Beton m3 0.120 240,000.00 28,800.00
kerikil m3 0.033 300,000.00 9,900.00
Baja Tulangan kg 4.850 15,000.00 72,750.00
C PERALATAN
D Jumlah A + B + C 1,022,730.00
E Overhead & Profit 10.0% 102,273.00
F Harga Satuan Pekerjaan (D+E) 1,125,003.00

124 Hitung Mengerjakan 1 bh Sumur Peresapan/ bak Penampungan 2,489,454.57


Galian tanah m3 1.824 78,650.00 143,434.95
Buis beton Dia. 80 cm bh 5.000 135,000.00 675,000.00
Pasangan bata 1 Pc : 4Ps m3 0.398 169,944.50 67,707.84
Batu kosong m3 0.630 433,026.00 272,806.38
Pasir urug m3 0.503 216,260.00 108,704.13
Ijuk m2 1.985 116,490.00 231,289.33
Plesteran 1 Pc : 4 Ps m2 1.454 82,882.80 120,544.74
Acian m2 1.454 48,578.75 70,652.93
Plat beton sumur respan tebal 8 cm
Beton K-175 m3 0.159 1,568,953.22 249,521.86
Bekisting beton non struktur (Praktis) m2 1.988 159,793.33 317,663.47
Pembesian dengan besi polos atau ulir kg 11.015 19,812.10 218,221.13
Bongkar Bekisting secara hati-hati m2 1.988 6,996.00 13,907.80
Harga Satuan Pekerjaan 2,489,454.57

125 Hitung Mengerjakan 1 unit Septicktank 9,055,219.23


Galian tanah m3 9.139 78,650.00 718,798.08
Pasangan bata 1 Pc : 4 Ps m2 17.193 169,944.50 2,921,821.80
Plesteran 1 Pc : 4 Ps m2 28.802 82,882.80 2,387,157.25
Acian m2 28.802 48,578.75 1,399,145.73
Pemasangan Pipa galvanis 2" m' 3.500 118,602.00 415,107.00
Plat beton tutup septicktank tebal 8 cm
Beton K-175 m3 0.241 1,568,953.22 378,717.69
Bekisting beton non struktur (Praktis) digunakan 2 kali m2 3.017 159,793.33 482,141.23
Pembesian dengan besi polos atau ulir kg 16.718 19,812.10 331,221.56
Bongkar Bekisting secara hati-hati m2 3.017 6,996.00 21,108.89
Harga Satuan Pekerjaan 9,055,219.23
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

126 A.5.1.1.27 Pemasangan 1 m' Pipa PVC tipe AW Ø 1" 40,414.00


A Tenaga 13,490.00
Pekerja L.01 OH 0.036 90,000.00 3,240.00
Tukang Pipa L.02 OH 0.060 150,000.00 9,000.00
Kepala Tukang Pipa L.03 OH 0.006 155,000.00 930.00
Mandor L.04 OH 0.002 160,000.00 320.00
B Bahan 23,250.00
Pipa PVC Ø 1" m' 1.200 15,000.00 18,000.00
Perlengkapan 35% x pipa Ls 0.350 5,250.00
C PERALATAN
D Jumlah A + B + C 36,740.00
E Overhead & Profit 10.0% 3,674.00
F Harga Satuan Pekerjaan (D+E) 40,414.00

127 A.5.1.1.26 Pemasangan 1 m' Pipa PVC tipe AW Ø ¾" 35,299.00


A Tenaga 13,490.00
Pekerja L.01 OH 0.036 90,000.00 3,240.00
Tukang Pipa L.02 OH 0.060 150,000.00 9,000.00
Kepala Tukang Pipa L.03 OH 0.006 155,000.00 930.00
Mandor L.04 OH 0.002 160,000.00 320.00
B Bahan 18,600.00
Pipa PVC Ø ¾" m' 1.200 12,000.00 14,400.00
Perlengkapan 35% x pipa Ls 0.350 4,200.00
C PERALATAN
D Jumlah A + B + C 32,090.00
E Overhead & Profit 10.0% 3,209.00
F Harga Satuan Pekerjaan (D+E) 35,299.00

128 A.5.1.1.29 Pemasangan 1 m' Pipa PVC tipe AW Ø 2" 59,818.00


A Tenaga 20,280.00
Pekerja L.01 OH 0.054 90,000.00 4,860.00
Tukang Pipa L.02 OH 0.090 150,000.00 13,500.00
Kepala Tukang Pipa L.03 OH 0.009 160,000.00 1,440.00
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 34,100.00
Pipa PVC Ø 2" m' 1.200 22,000.00 26,400.00
Perlengkapan 35% x pipa Ls 0.350 7,700.00
C PERALATAN
D Jumlah A + B + C 54,380.00
E Overhead & Profit 10.0% 5,438.00
F Harga Satuan Pekerjaan (D+E) 59,818.00

129 SPL A.5.1.1.29 Pemasangan 1 m' Pipa PVC tipe AW Ø 1-1/4" 52,145.50
A Tenaga 20,280.00
Pekerja L.01 OH 0.054 90,000.00 4,860.00
Tukang Pipa L.02 OH 0.090 150,000.00 13,500.00
Kepala Tukang Pipa L.03 OH 0.009 160,000.00 1,440.00
Mandor L.04 OH 0.003 160,000.00 480.00
B Bahan 27,125.00
Pipa PVC Ø 1,25" m' 1.200 17,500.00 21,000.00
Perlengkapan 35% x pipa Ls 0.350 6,125.00
C PERALATAN
D Jumlah A + B + C 47,405.00
E Overhead & Profit 10.0% 4,740.50
F Harga Satuan Pekerjaan (D+E) 52,145.50

130 A.5.1.1.31 Pemasangan 1 m' Pipa PVC tipe AW Ø 3" 89,639.00


A Tenaga 30,340.00
Pekerja L.01 OH 0.081 90,000.00 7,290.00
Tukang Pipa L.02 OH 0.135 150,000.00 20,250.00
Kepala Tukang Pipa L.03 OH 0.014 160,000.00 2,160.00
Mandor L.04 OH 0.004 160,000.00 640.00
B Bahan 51,150.00
Pipa PVC Ø 3" m' 1.200 33,000.00 39,600.00
Perlengkapan 35% x pipa Ls 0.350 11,550.00
C PERALATAN
D Jumlah A + B + C 81,490.00
E Overhead & Profit 10.0% 8,149.00
F Harga Satuan Pekerjaan (D+E) 89,639.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

131 A.5.1.1.32 Pemasangan 1 m' Pipa PVC tipe AW Ø 4" 100,122.00


A Tenaga 13,520.00
Pekerja L.01 OH 0.036 90,000.00 3,240.00
Tukang Pipa L.02 OH 0.060 150,000.00 9,000.00
Kepala Tukang Pipa L.03 OH 0.006 160,000.00 960.00
Mandor L.04 OH 0.002 160,000.00 320.00
B Bahan 77,500.00
Pipa PVC Ø 4" m' 1.200 50,000.00 60,000.00
Perlengkapan 35% x pipa Ls 0.350 17,500.00
C PERALATAN
D Jumlah A + B + C 91,020.00
E Overhead & Profit 10.0% 9,102.00
F Harga Satuan Pekerjaan (D+E) 100,122.00

132 A.5.1.1.1 Pemasangan 1 buah Closet Duduk / Monoblok 3,451,536.00


A Tenaga 487,760.00
Pekerja L.01 OH 3.300 90,000.00 297,000.00
Tukang Batu L.02 OH 1.100 150,000.00 165,000.00
Kepala Tukang batu L.03 OH 0.001 160,000.00 160.00
Mandor L.04 OH 0.160 160,000.00 25,600.00
B Bahan 2,650,000.00
Kloset duduk Monoblok ex. TOTO Unit 1.000 2,500,000.00 2,500,000.00
Kelengkapan 6% dari harga Kloset Ls 0.060 150,000.00
C PERALATAN
D Jumlah A + B + C 3,137,760.00
E Overhead & Profit 10.0% 313,776.00
F Harga Satuan Pekerjaan (D+E) 3,451,536.00

133 A.5.1.1.14a Pemasangan 1 buah Floor Drain 36,190.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang batu L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 14,600.00
Floor Drain bh 1.000 14,600.00 14,600.00

C PERALATAN
D Jumlah A + B + C 32,900.00
E Overhead & Profit 10.0% 3,290.00
F Harga Satuan Pekerjaan (D+E) 36,190.00
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp

134 A.5.1.1.14b Pemasangan 1 buah Roof Drain 86,130.00


A Tenaga 18,300.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Batu L.02 OH 0.100 150,000.00 15,000.00
Kepala Tukang batu L.03 OH 0.010 160,000.00 1,600.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 60,000.00
Roofdrain stainlis steell bh 1.000 60,000.00 60,000.00

C PERALATAN
D Jumlah A + B + C 78,300.00
E Overhead & Profit 10.0% 7,830.00
F Harga Satuan Pekerjaan (D+E) 86,130.00

135 A.5.1.1.4 Pemasangan 1 buah Urinoir 866,195.00


A Tenaga 169,750.00
Pekerja L.01 OH 1.200 90,000.00 108,000.00
Tukang Batu L.02 OH 0.145 150,000.00 21,750.00
Kepala Tukang batu L.03 OH 0.150 160,000.00 24,000.00
Mandor L.04 OH 0.100 160,000.00 16,000.00
B Bahan 617,700.00
Urinoir TOTO Unit 1.000 462,000.00 462,000.00
Perlengkapan 30% Harga Wastafel Ls 0.300 138,600.00
Portland Semen Kg 6.000 2,450.00 14,700.00
Pasir Pasang m3 0.010 240,000.00 2,400.00
C PERALATAN
D Jumlah A + B + C 787,450.00
E Overhead & Profit 10.0% 78,745.00
F Harga Satuan Pekerjaan (D+E) 866,195.00

136 A.5.1.1.5 Pemasangan 1 buah Wastafel 825,440.00


A Tenaga 169,750.00
Pekerja L.01 OH 1.200 90,000.00 108,000.00
Tukang Batu L.02 OH 0.145 150,000.00 21,750.00
Kepala Tukang batu L.03 OH 0.150 160,000.00 24,000.00
Mandor L.04 OH 0.100 160,000.00 16,000.00
B Bahan 580,650.00
Wastafel self rimming lavatory merk TOTO Unit 1.000 433,500.00 433,500.00
Perlengkapan 30% Harga Wastafel Ls 0.300 130,050.00
Portland Semen Kg 6.000 2,450.00 14,700.00
Pasir Pasang m3 0.010 240,000.00 2,400.00
C PERALATAN
D Jumlah A + B + C 750,400.00
E Overhead & Profit 10.0% 75,040.00
F Harga Satuan Pekerjaan (D+E) 825,440.00

137 A.5.1.1.8 Pemasangan 1 m' Pipa galvanis dia. 2" 118,602.00


A Tenaga 24,120.00
Pekerja L.01 OH 0.054 90,000.00 4,860.00
Tukang Batu L.02 OH 0.090 150,000.00 13,500.00
Kepala Tukang batu L.03 OH 0.009 160,000.00 1,440.00
Mandor L.04 OH 0.027 160,000.00 4,320.00
B Bahan 83,700.00
Pipa Besi GIP Diameter 2" m' 1.200 54,000.00 64,800.00
Perlengkapan 35% x pipa Ls 0.350 18,900.00
C PERALATAN
D Jumlah A + B + C 107,820.00
E Overhead & Profit 10.0% 10,782.00
F Harga Satuan Pekerjaan (D+E) 118,602.00

138 A.5.1.1.19a Pemasangan 1 buah Stop Kran Ø 1" pipa GIP 230,029.25
A Tenaga 68,100.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Batu L.02 OH 0.400 150,000.00 60,000.00
Kepala Tukang batu L.03 OH 0.040 160,000.00 6,400.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 141,017.50
Stop kran air 1" pipa GIP setara onda bh 1.000 141,000.00 141,000.00
Sealtape bh 0.003 7,000.00 17.50
HARGA JUMLAH
No. SNI URAIAN PEKERJAAN KODE SAT. KOEF BAHAN/UPAH
Rp Rp
C PERALATAN
D Jumlah A + B + C 209,117.50
E Overhead & Profit 10.0% 20,911.75
F Harga Satuan Pekerjaan (D+E) 230,029.25

139 A.5.1.1.19b Pemasangan 1 buah Kran air Ø ½" atau Ø ¾" 138,069.25
A Tenaga 68,100.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Batu L.02 OH 0.400 150,000.00 60,000.00
Kepala Tukang batu L.03 OH 0.040 160,000.00 6,400.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 57,417.50
Kran air ex. ONDA bh 1.000 57,400.00 57,400.00
Sealtape bh 0.003 7,000.00 17.50
C PERALATAN
D Jumlah A + B + C 125,517.50
E Overhead & Profit 10.0% 12,551.75
F Harga Satuan Pekerjaan (D+E) 138,069.25

140 A.5.1.1.19c Pemasangan 1 buah Kran air wastafel 157,429.25


A Tenaga 68,100.00
Pekerja L.01 OH 0.010 90,000.00 900.00
Tukang Batu L.02 OH 0.400 150,000.00 60,000.00
Kepala Tukang batu L.03 OH 0.040 160,000.00 6,400.00
Mandor L.04 OH 0.005 160,000.00 800.00
B Bahan 75,017.50
Kran air wastafel ex.YUTA bh 1.000 75,000.00 75,000.00
Sealtape bh 0.003 7,000.00 17.50
C PERALATAN
D Jumlah A + B + C 143,117.50
E Overhead & Profit 10.0% 14,311.75
F Harga Satuan Pekerjaan (D+E) 157,429.25
TABEL BEKISTING DAN PEMBESIAN GEDUNG SATPAS SLEMAN
No Nama BELANG M3 DIMENSI JENIS TULANGAN KOEFISIEN BERAT TULANGAN B
P L T P.TOT BEGEL/ TUL.BAGI TULANGAN POKOK Diameter (milimeter) BEGEL POKOK TOTAL p1
JARAK JUMLAH P.1 BUAH P. TOTAL JUMLAH P.1 BUAH P. TOTAL 6 8 10 12 13 14 16 19 22 kg kg kg m
0.22 0.393 0.62 0.887 1.048 1.209 1.578 2.22 2.983
1 FOOTPLATE FP 1 1 1.2 1.2 0.4 1.74
Uk . 120x120x40
Tulangan arah x 0.15 8 3.20 25.60 1.048 46.58 46.58 1.2
Tulangan arah y 0.15 8 3.20 25.60 1.048 46.58 46.58
Tulangan arah z 0.15 3 4.80 12.80 1.048 23.29 23.29
kebutuhan tulangan 116.44

2 KOLOM PEDESTAL K1
Ukuran 40x40 1 0.4 0.4 6.25 0.150 36.46 1.5 54.69 16.00 6.25 100.00 0.62 1.578 33.91 157.80 191.71 0.4
Besi Exstra 20 x D 0.200 16.00 0.41 6.55 1.578 kebutuhan tulangan 10.34 10.34
202.05

3 KOLOM PEDESTAL K2
Ukuran 40x40 1 0.4 0.4 6.25 0.150 36.46 1.5 54.69 8.00 6.25 50.00 0.62 1.578 33.91 78.90 112.81 0.4
Besi Exstra 20 x D 0.200 8.00 0.20 1.64 1.578 kebutuhan tulangan 2.59 2.59
115.39
4 BALOK SLOOF S1
Ukuran 20x30 1 0.2 0.30 16.67 0.150 97.22 0.9 87.50 6.00 16.67 100.00 0.62 1.048 54.25 104.80 159.05 0.3
0.200 kebutuhan tulangan 159.05

5 KOLOM K1
Ukuran 40x40 1 0.4 0.4 6.25 0.150 36.46 1.5 54.69 16.00 6.25 100.00 0.62 1.578 33.91 157.80 191.71 0.4
0.200 kebutuhan tulangan
191.71

6 KOLOM K2
Ukuran 40x40 1 0.4 0.4 6.25 0.150 36.46 1.5 54.69 8.00 6.25 50.00 0.62 1.578 33.91 78.90 112.81 0.4
0.200 kebutuhan tulangan
112.81

7 BALOK B1
Ukuran 30x50 1 0.30 0.55 6.06 0.150 35.35 1.6 56.57 10.00 6.06 60.61 0.62 1.578 35.07 95.64 130.71 0.55
0.200 2.00 6.06 12.12 1.048 kebutuhan tulangan 12.70 12.70
143.41

8 BALOK B2
Ukuran 20x30 1 0.2 0.3 16.67 0.150 97.22 0.9 87.50 6.00 16.67 100.00 0.62 1.578 54.25 157.80 212.05 0.3
0.200 kebutuhan tulangan 212.05

9 BALOK BORDES TANGGA


Ukuran 20x30 1 0.2 0.3 16.67 0.150 55.56 0.9 50.00 3.00 8.33 25.00 0.393 1.048 19.65 26.20 45.85 0.2
0.200 41.67 0.9 37.50 3.00 8.33 25.00 0.62 23.25 26.20 49.45
kebutuhan tulangan 95.30
10 PELAT BORDES TANGGA A dan B tbl. 15 1 0.15 2.58
Tulangan Atas 17.21 2.58 44.44 0.62 27.56 27.56 55.11
Tulangan Bawah 17.21 2.58 44.44 0.62 27.56 27.56 55.11
kebutuhan tulangan 110.22
TABEL BEKISTING DAN PEMBESIAN GEDUNG SATPAS SLEMAN
No Nama BELANG M3 DIMENSI JENIS TULANGAN KOEFISIEN BERAT TULANGAN B
P L T P.TOT BEGEL/ TUL.BAGI TULANGAN POKOK Diameter (milimeter) BEGEL POKOK TOTAL p1
JARAK JUMLAH P.1 BUAH P. TOTAL JUMLAH P.1 BUAH P. TOTAL 6 8 10 12 13 14 16 19 22 kg kg kg m
11 PELAT TANGGA tbl. 15 1 0.15 2.58
Tulangan Atas 26.82 2.68 71.93 0.62 44.60 44.60 89.19
Tulangan Bawah 17.88 2.68 47.95 0.62 29.73 29.73 59.46
kebutuhan tulangan 148.66

12 PELAT LANTAI tbl. 12 1 0.12 2.89


Tulangan Atas 38.49 2.89 111.11 0.62 68.89 68.89
Tulangan Bawah 38.49 2.89 111.11 0.62 68.89 68.89
kebutuhan tulangan 137.78

13 PELAT Atap tbl. 10 1 0.1 3.16


Tulangan Atas 42.16 3.16 133.33 0.62 82.67 82.67
Tulangan Bawah 42.16 3.16 133.33 0.62 82.67 82.67
kebutuhan tulangan 165.33

14 BALOK SLOOF PRAKTIS


Ukuran 15x20 1 0.15 0.2 33.33 0.150 194.44 0.6 116.67 4.00 33.33 133.33 0.393 1.048 45.85 139.73 185.58 0.2
0.200 kebutuhan tulangan 185.58

15 KOLOM PRAKTIS
Ukuran 15 x 15 1 0.15 0.15 44.44 0.150 296.30 0.5 148.15 4.00 44.44 177.78 0.393 0.62 58.22 110.22 168.44 0.15
0.150 kebutuhan tulangan 168.44

16 BALOK LATEI BL
Ukuran 12x12 1 0.12 0.12 69.44 0.100 578.70 0.38 219.91 5.00 69.44 347.22 0.22 0.62 48.38 215.28 263.66 0.12
0.150 kebutuhan tulangan 263.66

17 Balok B3
Ukuran 15x20 1 0.15 0.2 33.33 0.150 194.44 0.6 116.67 6.00 33.33 200.00 0.393 1.048 45.85 209.60 255.45 0.15
0.200 kebutuhan tulangan 255.45

13 PELAT LANTAI DROFF OF tbl.15 1 0.15 2.58


Tulangan Atas 6.67 wiremesh 10 = 8.51 kg 56.73 56.73 bekisting menggunaka
Tulangan Bawah 6.67 56.73 56.73
kebutuhan tulangan 113.47
14 PELAT TUTUP SALURAN tbl. 15 1 0.15 2.58
Tulangan Atas 34.43 2.58 88.89 0.62 55.11 55.11
Tulangan Bawah 34.43 2.58 88.89 0.62 55.11 55.11
kebutuhan tulangan 110.22
15 Pelat tutup Septicktank/Sumur Peresapan tbl.8 1 0.08 3.54
Tulangan Atas 24.24 3.64 88.11 0.393 34.63 34.63
Tulangan Bawah 24.24 3.64 88.11 0.393 34.63 34.63
kebutuhan tulangan 69.26
BEGESTING
p2 p3 p4 P TOTAL
m m m m m2

1.2 0.4 3.33

0.4 0.4 0.4 6.25 10.00

0.4 0.4 0.4 6.25 10.00

0.3 16.67 10.00

0.4 0.4 0.4 6.25 10.00

0.4 0.4 0.4 6.25 10.00

0.55 0.3 6.06 8.48

0.3 0.2 16.67 13.33

0.3 0.3 16.67 13.33

2.58 6.67
BEGESTING
p2 p3 p4 P TOTAL
m m m m m2

2.58 6.67

2.89 8.33

3.16 10.00

0.2 33.33 13.33

0.15 44.44 13.33

0.12 69.44 16.67

0.2 0.2 33.33 18.33

bekisting menggunakan plastik cor 2.58 6.67

2.58 6.67

3.54 12.50