NO ITEM PEKERJAAN TOTAL % 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

100

i START / KONTRAK / TERMIN I

1.554
90

A PEKERJAAN PERSIAPAN 7,770,800 1.554%

5.631 5.631
80

B PEKERJAAN PONDASI & TANAH 56,313,947 11.262%

C PEKERJAAN STRUKTUR 187,085,572 37.415% 9.354 9.354 9.354 9.354 70

D PEKERJAAN PLAFOND 5,719,948 1.144% 0.572 0.572 60

E PEKERJAAN PASANGAN 94,421,202 18.883% 3.147 3.147 3.147 3.147 3.147 3.147 50

F PEKERJAAN KUSEN PINTU & JENDELA 54,879,655 10.975% 2.744 2.744 2.744 2.744 40

G PEKERJAAN PENGECATAN 26,565,936 5.313% 1.771 1.771 1.771 30

H PEKERJAAN PLUMBING & SANITAIR 11,959,195 2.392% 0.797 0.797 0.797 20

I PEKERJAAN LISTRIK 43,815,495 8.763% 2.191 2.191 2.191 2.191 10

J LAIN - LAIN 11,500,000 2.300% 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0.135 0

ii TERMIN II

Bobot Rencana 500,031,750.19 100.000% 1.69 5.77 15.12 9.49 9.49 10.06 3.85 3.28 3.28 3.28 6.03 6.03 5.07 5.87 4.89 4.89 1.91
Bobot Realisasi
Akumulasi Rencana 1.69 7.46 22.58 32.06 41.55 51.61 55.47 58.75 62.03 65.32 71.34 77.37 82.44 88.31 93.20 98.09 100.00
Akumulasi Realisasi

Pimpinan Lembaga UNIT PENGELOLA KEGIATAN

1. Ketua ROMIN
2. Sekertaris JUHARIAH
3. Anggota KAHERUDIN
Romin
REKAPITULASI RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : TEKHNIK OTOMOTIF (TEKHNIK SEPEDA MOTOR) ( GROUP A )
TAHUN ANGGARAN : 2020

NO ITEM PEKERJAAN TOTAL

A PEKERJAAN PERSIAPAN 7,770,800.00


B PEKERJAAN PONDASI & TANAH 56,313,946.72
C PEKERJAAN STRUKTUR 187,085,572.42
D PEKERJAAN PLAFOND 5,719,948.00
E PEKERJAAN PASANGAN 94,421,201.98
F PEKERJAAN KUSEN PINTU & JENDELA 54,879,655.00
G PEKERJAAN PENGECATAN 26,565,936.08
H PEKERJAAN PLUMBING & SANITAIR 11,959,195.00
I PEKERJAAN LISTRIK 43,815,495.00
J LAIN - LAIN 11,500,000.00

TOTAL 500,031,750.19
PEMBULATAN 500,000,000.00
TERBILANG : LIMA RATUS JUTA RUPIAH

Pimpinan Pesantren

( Romin )

Ketua Pengelola Keuangan


Ketua Pengelola Kegiatan

(MUHAMMAD SAHIDI, S.Pd)


(KHARUDIN)
RENCANA ANGGARAN BIAYA

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
KEJURUAN : TEKHNIK OTOMOTIF (TEKHNIK SEPEDA MOTOR) ( GROUP A )
TAHUN ANGGARAN : 2020

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME SAT. ( Rp. ) ( Rp. )

A PEKERJAAN PERSIAPAN
1 Papan Proyek 1.00 unt 551,000.00 551,000.00
2 Pek. Pengukuran dan Bowplank 54.00 m' 21,600.00 1,166,400.00
3 Pek. Listrik & Air Kerja 1.00 ls 5,086,400.00 5,086,400.00
4 Pek. Laporan & Dokumentasi 1.00 ls 967,000.00 967,000.00
Sub Total A 7,770,800.00
B PEKERJAAN PONDASI & TANAH
1 Pek. Galian Tanah Pondasi 75.48 m3 96,000.00 7,246,233.60
2 Pek. Urug Tanah Kembali 25.16 m3 30,000.00 754,816.00
3 Pek. Urug Tanah Peninggian Peil Lantai (t = 10 cm) 16.83 m3 80,000.00 1,346,560.00
4 Pek. Pasir Urug
- Bawah Pondasi 5.67 m3 165,950.00 940,936.50
- Bawah Lantai 22.36 m3 165,950.00 3,710,642.00
5 Pek. Pondasi Tapak P1 (100x100x20-40)
- Beton K-225 4.48 m3 1,052,663.49 4,715,932.44
- Pembesian 541.25 kg 9,290.00 5,028,220.74
- Bekisting 24.32 m2 84,613.33 2,057,796.27
6 Pek. Pondasi Batu Belah P2 26.18 m3 618,800.00 16,200,184.00
7 Pek. Sloof Beton (15/30)
- Beton K-225 3.32 m3 1,052,663.49 3,489,579.48
- Pembesian 746.14 kg 9,290.00 6,931,677.69
- Bekisting 44.20 m2 88,040.00 3,891,368.00
Sub Total B 56,313,946.72
C PEKERJAAN STRUKTUR
C.1 STRUKTUR BETON
1 Pek. Kolom Beton K1 (30/30)
- Beton K-225 6.91 m3 1,052,663.49 7,276,010.06
- Pembesian 1,005.19 kg 9,290.00 9,338,243.90
- Bekisting 92.16 m2 143,353.33 13,211,443.20
2 Pek. Kolom Praktis KP (15/15)
- Beton K-175 0.55 m3 1,004,389.68 549,150.06
- Pembesian 103.75 kg 9,290.00 963,825.32
- Bekisting 14.58 m2 231,000.00 3,367,980.00
3 Pek. Balok Beton B1 (20/30)
- Beton K-225 3.36 m3 1,052,663.49 3,536,949.33
- Pembesian 591.39 kg 9,290.00 5,494,056.00
- Bekisting 44.80 m2 144,853.33 6,489,429.33
4 Pek. Balok Lintel BL (15/15),dan RB (15/15)
- Beton K-175 1.37 m3 1,004,389.68 1,378,524.84
- Pembesian 477.72 kg 9,290.00 4,438,036.61
- Bekisting 27.45 m2 144,853.33 3,976,224.00
5 Pek. Lantai Beton T=15 cm
- Beton K-225 21.66 m3 1,052,663.49 22,800,691.24
- Pembesian Wiremesh M-8 1 lapis 144.40 m2 9,290.00 1,341,476.00
- Bekisting 7.80 m2 162,420.00 1,266,876.00
6 Pek. Ramp Beton T = 10 cm
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ( Rp. ) ( Rp. )

- Beton K-175 0.35 m3 1,004,389.68 353,545.17


- Pembesian 42.24 kg 9,290.00 392,409.60
- Bekisting 0.69 m2 84,613.33 58,484.74
7 Pek. Kolom Sopi Sopi (30/30)
- Beton K-225 0.82 m3 1,052,663.49 864,973.59
- Pembesian 48.78 kg 9,290.00 453,147.12
- Bekisting 10.96 m2 143,353.33 1,570,579.12
8 Pek. Ring Balok Sopi Sopi (15/20)
- Beton K-175 1.02 m3 1,004,389.68 1,021,464.31
- Pembesian 204.20 kg 9,290.00 1,896,995.32
- Bekisting 20.34 m2 231,000.00 4,698,540.00
9 Pek. Plat Beton Topi Topi (10/60)
- Beton K-225 1.20 m3 1,052,663.49 1,263,196.19
- Pembesian 198.52 kg 9,290.00 1,844,292.70
- Bekisting 14.00 m2 144,853.33 2,027,946.67
C.2 PEKERJAAN ATAP
1 Rangka Atap Baja Ringan 231.28 m2 156,525.00 36,201,102.00
2 Atap Spandek t = 0.35 mm 231.28 m2 96,500.00 22,318,520.00
3 Listplank GRC 78.00 m' 76,670.00 5,980,260.00
4 Pasang Aluminium Foil, Glaswool, Roofmesh 160.00 m2 129,445.00 20,711,200.00
Sub Total C 187,085,572.42
D PEKERJAAN PLAFOND
1 Plafond Gipsum 9 mm + Rangka Hollow 4/4 ; t = 0.35 12.00 m2 85,600.00 1,027,200.00
2 Plafond Calsiboard 4,5 mm + Rangka 50.87 m2 80,400.00 4,089,948.00
3 Lis Gipsum 5 cm 22.00 m' 27,400.00 602,800.00
Sub Total D 5,719,948.00
E PEKERJAAN PASANGAN
1 Pasangan Dinding Bata 221.10 m2 94,300.00 20,849,409.38
2 Plester + Acian 442.19 m3 69,900.00 30,909,304.68
3 Pasangan Rolaag Bata 19.80 m' 84,700.00 1,677,060.00
4 Pasangan Saluran Terbuka (U pasangan bata) 42.00 m' 167,200.00 7,022,400.00
5 Pekerjaan Rabat Beton t = 5 cm keliling bang lbr = 60 cm 2.04 m3 1,004,389.68 2,048,954.95
6 Pekerjaan Meja Beton Wastafel t = 8 cm 0.10 m3 1,004,389.68 96,421.41
7 Pasangan Keramik Lantai 40/40 Polished 12.00 m2 137,600.00 1,651,200.00
8 Pasangan Keramik Lantai 30/30 Polished 55.60 m2 117,800.00 6,549,680.00
9 Pasangan Keramik Lantai 20/20 Unpolished 3.04 m2 104,600.00 317,722.50
10 Pasangan Plint Keramik Lantai 40/10 polished 13.00 m' 31,100.00 404,300.00
11 Acian Lantai 144.40 m2 22,200.00 3,205,680.00
12 Cat minyak 144.40 m2 32,600.00 4,707,440.00
13 Pengecatan Jalur lantai 8.23 m2 58,050.00 477,983.70
14 Pasangan Keramik Bak & Meja Wastafel 20/20 Polished 1.77 m2 104,600.00 184,749.75
15 Pasangan Keramik Dinding 30/60 Polished 5.29 m2 173,500.00 918,509.00
16 Pasangan Batu Alam Candi Kolom Entrace 7.62 m2 272,100.00 2,072,313.60
17 Pek. Logo & Tulisan 1.00 ls 2,000,000.00 2,000,000.00
18 List Dinding, Kusen 215.94 m1 42,200.00 9,112,668.00
19 Opening Dinding Exhasufan Dia 16 '' (40,64 cm) 5.10 m1 42,200.00 215,405.00
Sub Total E 94,421,201.98
F PEKERJAAN KUSEN PINTU & JENDELA
1 Kusen/Pintu type P1 1.00 unt 4,861,700.00 4,861,700.00
2 Kusen/Pintu type P2 2.00 unt 2,383,100.00 4,766,200.00
3 Kusen/Pintu type P3 (Spandrel) 1.00 unt 3,806,200.00 3,806,200.00
4 Kusen/Jendela type J1 2.00 unt 2,715,200.00 5,430,400.00
5 Kusen/Jendela type J2 9.00 unt 3,007,100.00 27,063,900.00
6 Kusen/Jendela type J3 1.00 unt 1,567,500.00 1,567,500.00
HARGA SATUAN JUMLAH HARGA
NO. URAIAN PEKERJAAN VOLUME SAT. ( Rp. ) ( Rp. )

7 Kusen/Jendela type BV 1.00 unt 331,300.00 331,300.00


8 Rolling Door T=0.8 Galvalume 1.00 unit 5,939,200.00 5,939,200.00
9 Tralis Ventilasi Teras (Besi Hollow) 7.15 m1 155,700.00 1,113,255.00
Sub Total F 54,879,655.00
G PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Interior 221.10 m2 58,050.00 12,834,657.63
2 Pek. Pengecatan Dinding Exterior 221.10 m2 50,750.00 11,220,652.45
3 Pek. Pengecatan Plafond 62.87 m2 27,800.00 1,747,786.00
4 Pek. Pengecatan Listplank 23.40 m2 32,600.00 762,840.00
Sub Total G 26,565,936.08
H PEKERJAAN PLUMBING & SANITAIR
1 Instalasi Pipa PVC AW 4" 16.00 m' 125,955.00 2,015,280.00
2 Instalasi Pipa PVC AW 2" 12.00 m' 51,705.00 620,460.00
3 Instalasi Pipa PVC AW 3/4" 20.00 m' 26,505.00 530,100.00
4 Instalasi Pipa PVC AW 1/2" 15.00 m' 18,405.00 276,075.00
5 Septic Tank dan Rembesan 1.00 unt 5,980,400.00 5,980,400.00
6 Pemasangan Closed Jongkok 1.00 bh 601,280.00 601,280.00
7 Pemasangan Kran Air 2.00 bh 65,200.00 130,400.00
8 Pemasangan Wastafel + Kran 2.00 bh 779,900.00 1,559,800.00
9 Pemasangan Cermin Wastafel 100x200 1.00 unt 245,400.00 245,400.00
Sub Total H 11,959,195.00
I PEKERJAAN LISTRIK
1 Penyambungan Daya Listrik 11,000.00 VA 1,200.00 13,200,000.00
2 Perijinan Sertifikat Layak Operasi (SLO) 11,000.00 VA 350.00 3,850,000.00
3 Panel Listrik 1.00 unt 1,328,750.00 1,328,750.00
4 Pek. Instalasi Kabel Feeder NYY 4x10 mm2 2.00 m' 65,275.00 130,550.00
5 Pek. Instalasi Penerangan & Power NYM 3x2,5 mm2 + condui 27.00 ttk 145,600.00 3,931,200.00
6 Pek. Instalasi Power Kipas, Exhaustfan 14.00 ttk 145,600.00 2,038,400.00
7 Pemasangan Lampu TKO 2x36W 18.00 bh 290,720.00 5,232,960.00
8 Pemasangan Lampu Baret Kotak 18/22W 7.00 bh 411,470.00 2,880,290.00
9 Pemasangan Lampu E27ESS 8 Watt + DownLight 4'' 2.00 bh 201,470.00 402,940.00
10 Pemasangan Saklar Engkle 2.00 bh 52,590.00 105,180.00
11 Pemasangan Saklar Double 5.00 bh 58,050.00 290,250.00
12 Pemasangan Stop Kontak Single 13.00 bh 44,540.00 579,020.00
13 Pemasangan Exhaust Fan dinding 4.00 unit 710,720.00 2,842,880.00
14 Pemasangan Kipas angin Gantung 7.00 unit 920,720.00 6,445,040.00
15 Pemasangan Saklar Exhaus Fan 4.00 bh 52,590.00 210,360.00
16 Grounding (max 2 Ohm) 1.00 lot 347,675.00 347,675.00
Sub Total I 43,815,495.00
L LAIN - LAIN
1 IMB 1.00 dok 1,500,000.00 1,500,000.00
2 Transportasi 2.00 paket 1,000,000.00 2,000,000.00
3 Ketua Unit Pengelola Teknis 4.00 OB 400,000.00 1,600,000.00
4 Ketua Unit Pengelola Keuangan 4.00 OB 400,000.00 1,600,000.00
5 Anggota Pengelola Teknis 8.00 OB 300,000.00 2,400,000.00
6 Anggota Pengelola Keuangan 8.00 OB 300,000.00 2,400,000.00
Sub Total L 11,500,000.00
TOTAL 500,031,750.19
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

No Uraian Harga Satuan Jumlah Harga

PEKERJAAN GALIAN

1 1 m3 Galian Untuk Tanah Biasa sedalam maks. 2 m Rp 96,000.00


Upah An. SNI ( Revisi ) 6.2.1
1.2000 OH Pekerja Rp 80,000.00 Rp 96,000.00

Sub total : Rp 96,000.00

2 1 m3 Urugan kembali Rp 30,000.00


Bahan 0.2000 m3 Tanah Urug Rp 50,000.00 Rp 10,000.00
Sub total : Rp 10,000.00
Upah An. SNI ( Revisi ) 6.9.1
0.2500 OH Pekerja Rp 80,000.00 Rp 20,000.00

Sub total : Rp 20,000.00

3 1 m3 Urugan pasir dengan pasir urug Rp 165,950.00


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Pasir urug Rp 114,500.00 Rp 125,950.00
Sub total : Rp 125,950.00
Upah An. SNI ( Revisi ) 6.11.2
0.5000 OH Pekerja Rp 80,000.00 Rp 40,000.00

Sub total : Rp 40,000.00

4 1 m3 Urugan dengan kerikil Rp 243,500.00


Bahan An. SNI ( Revisi ) 6.11.1
1.1000 m3 Split Rp 185,000.00 Rp 203,500.00
Sub total : Rp 203,500.00
Upah An. SNI ( Revisi ) 6.11.2
0.5000 OH Pekerja Rp 80,000.00 Rp 40,000.00

Sub total : Rp 40,000.00

5 1 m3 Urugan tanah pilihan Rp 80,000.00


Bahan An. SNI ( Revisi ) 6.11.1
1.2000 m3 Tanah campur Rp 50,000.00 Rp 60,000.00
Sub total : Rp 60,000.00
Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja Rp 80,000.00 Rp 20,000.00

Sub total : Rp 20,000.00

6 1 m3 Pemadatan tanah Rp 20,774.38


Upah An. SNI ( Revisi ) 6.11.2
0.2500 OH Pekerja Rp 80,000.00 Rp 20,000.00

Sub total : Rp 20,000.00


Alat
0.0210 jam Sewa Stamper Rp 36,875.00 Rp 774.38
Sub total : Rp 774.38
1 m2 Pemadatan tanah 20 cm Rp 4,154.88

PEKERJAAN BETON
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

No Uraian Harga Satuan Jumlah Harga

1 1 m3 beton mutu f'c = 14.5 Mpa (K175), slump (12 +/- 2), w/c = 0.66 sitemix Rp 1,004,389.68
Bahan
326.000 kg Portland Cement Rp 1,200.00 Rp 391,200.00
0.543 m3 Pasir Beton Rp 185,000.00 Rp 100,428.57
0.762 m3 Kerikil (maks.imum 30 mm) Rp 185,000.00 Rp 141,011.11
215.000 ltr Air Rp 1,000.00 Rp 215,000.00
Sub total : Rp 847,639.68
Upah
1.650 OH Pekerja Rp 80,000.00 Rp 132,000.00
0.275 OH Tukang batu Rp 90,000.00 Rp 24,750.00

Sub total : Rp 156,750.00

2 1 m3 beton mutu f'c = 19.3 Mpa (K225), slump (12 +/- 2), w/c = 0.58 Rp 1,052,663.49
Bahan
371.000 kg Portland Cement Rp 1,200.00 Rp 445,200.00
0.499 m3 Pasir Beton Rp 185,000.00 Rp 92,235.71
0.776 m3 Kerikil (maks.imum 30 mm) Rp 185,000.00 Rp 143,477.78
215.000 ltr Air Rp 1,000.00 Rp 215,000.00
Sub total : Rp 895,913.49
Upah
1.650 OH Pekerja Rp 80,000.00 Rp 132,000.00
0.275 OH Tukang batu Rp 90,000.00 Rp 24,750.00

Sub total : Rp 156,750.00

3 Pembesian 10 kg dengan besi ulir Rp 147,500.00


Pembesian 1 kg Rp 14,750.00
Bahan
10.500 kg Besi Ulir Rp 12,700.00 Rp 133,350.00
0.150 kg Kawat Beton Rp 15,000.00 Rp 2,250.00
Sub total : Rp 135,600.00
Upah
0.070 OH Pekerja Rp 80,000.00 Rp 5,600.00
0.070 OH Tukang besi Rp 90,000.00 Rp 6,300.00

Sub total : Rp 11,900.00

4 Pembesian 10 kg dengan besi polos Rp 92,900.00


Pembesian 1 kg Rp 9,290.00
Bahan
10.500 kg Besi Polos Rp 7,500.00 Rp 78,750.00
0.150 kg Kawat Beton Rp 15,000.00 Rp 2,250.00
Sub total : Rp 81,000.00
Upah
0.070 OH Pekerja Rp 80,000.00 Rp 5,600.00
0.070 OH Tukang besi Rp 90,000.00 Rp 6,300.00

Sub total : Rp 11,900.00


ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

No Uraian Harga Satuan Jumlah Harga

5 Memasang 1 m2 bekisting untuk pondasi Rp 84,613.33


Bahan
0.040 m3 Kayu kelas III Rp 1,400,000.00 Rp 56,000.00
0.100 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 1,640.00
0.100 ltr Minyak Bekisting Rp 12,000.00 Rp 1,200.00
Sub total : Rp 58,840.00
Penggunaan Bekisting dipakai 2x Rp 19,613.33

Upah
0.520 OH Pekerja Rp 80,000.00 Rp 41,600.00
0.260 OH Tukang Kayu Rp 90,000.00 Rp 23,400.00

Sub total : Rp 65,000.00

6 Memasang 1 m2 bekisting untuk Sloof Rp 88,040.00


Bahan
0.045 m3 Kayu kelas III Rp 1,400,000.00 Rp 63,000.00
0.300 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 4,920.00
0.100 ltr Minyak Bekisting Rp 12,000.00 Rp 1,200.00
Sub total : Rp 69,120.00
Penggunaan Bekisting dipakai3x Rp 23,040.00

Upah
0.520 OH Pekerja Rp 80,000.00 Rp 41,600.00
0.260 OH Tukang Kayu Rp 90,000.00 Rp 23,400.00

Sub total : Rp 65,000.00

7 Memasang 1 m2 bekisting untuk Kolom Rp 143,353.33


Bahan
0.040 m3 Kayu kelas III Rp 1,400,000.00 Rp 56,000.00
0.400 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 6,560.00
0.200 ltr Minyak Bekisting Rp 12,000.00 Rp 2,400.00
0.015 m3 Balok Kayu Kelas II Rp 1,500,000.00 Rp 22,500.00
0.350 lbr Plywood tebal 9 mm Rp 190,000.00 Rp 66,500.00
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 14,300.00 Rp 28,600.00
Sub total : Rp 182,560.00
Penggunaan Bekisting dipakai 2x Rp 60,853.33

Upah
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00

Sub total : Rp 82,500.00

8 Memasang 1 m2 bekisting untuk Balok Rp 144,853.33


Bahan
0.040 m3 Kayu kelas III Rp 1,400,000.00 Rp 56,000.00
0.400 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 6,560.00
0.200 ltr Minyak Bekisting Rp 12,000.00 Rp 2,400.00
0.018 m3 Balok Kayu Kelas II Rp 1,500,000.00 Rp 27,000.00
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

No Uraian Harga Satuan Jumlah Harga


0.350 lbr Plywood tebal 9 mm Rp 190,000.00 Rp 66,500.00
2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 14,300.00 Rp 28,600.00
Sub total : Rp 187,060.00
Penggunaan Bekisting dipakai 2x Rp 62,353.33

Upah
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00

Sub total : Rp 82,500.00

9 Memasang 1 m2 bekisting untuk Lantai Rp 162,420.00


Bahan
0.040 m3 Kayu kelas III Rp 1,400,000.00 Rp 56,000.00
0.400 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 6,560.00
0.200 ltr Minyak Bekisting Rp 12,000.00 Rp 2,400.00
0.015 m3 Balok Kayu Kelas II Rp 1,500,000.00 Rp 22,500.00
0.350 lbr Plywood tebal 9 mm Rp 190,000.00 Rp 66,500.00
6.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 14,300.00 Rp 85,800.00
Sub total : Rp 239,760.00
Penggunaan Bekisting dipakai 2x Rp 79,920.00

Upah
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00

Sub total : Rp 82,500.00

10 Memasang 1 m2 bekisting untuk Dinding / Lisplang Rp 145,953.33


Bahan
0.030 m3 Kayu kelas III Rp 1,400,000.00 Rp 42,000.00
0.400 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 6,560.00
0.200 ltr Minyak Bekisting Rp 12,000.00 Rp 2,400.00
0.020 m3 Balok Kayu Kelas II Rp 1,500,000.00 Rp 30,000.00
0.350 lbr Plywood tebal 9 mm Rp 190,000.00 Rp 66,500.00
3.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 14,300.00 Rp 42,900.00
Sub total : Rp 190,360.00
Penggunaan Bekisting dipakai 3x Rp 63,453.33

Upah
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00

Sub total : Rp 82,500.00

11 Memasang 1 m2 bekisting untuk Tangga Rp 138,486.67


Bahan
0.030 m3 Kayu kelas III Rp 1,400,000.00 Rp 42,000.00
0.400 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 6,560.00
0.150 ltr Minyak Bekisting Rp 12,000.00 Rp 1,800.00
0.015 m3 Balok Kayu Kelas II Rp 1,500,000.00 Rp 22,500.00
0.350 lbr Plywood tebal 9 mm Rp 190,000.00 Rp 66,500.00
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

No Uraian Harga Satuan Jumlah Harga


2.000 btg Dolken kayu Galam, f (8-10), Panjang 4 m Rp 14,300.00 Rp 28,600.00
Sub total : Rp 167,960.00
Penggunaan Bekisting dipakai 3x Rp 55,986.67

Upah
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang Kayu Rp 90,000.00 Rp 29,700.00

Sub total : Rp 82,500.00

12 Memasang 1 m' Kolom Praktis Beton Bertulang (11x11) cm Rp 59,589.00


Bahan
0.002 m3 Kayu kelas III Rp 1,400,000.00 Rp 2,800.00
0.010 kg Paku 5 cm - 10 cm Rp 16,400.00 Rp 164.00
3.000 kg Besi Beton Polos Rp 7,500.00 Rp 22,500.00
0.450 kg Kawat Beton Rp 15,000.00 Rp 6,750.00
4.000 kg Portland Cement Rp 1,200.00 Rp 4,800.00
0.006 m3 Pasir Beton Rp 185,000.00 Rp 1,110.00
0.009 m3 Kerikil Rp 185,000.00 Rp 1,665.00
Sub total : Rp 39,789.00
Upah
0.180 OH Pekerja Rp 80,000.00 Rp 14,400.00
0.020 OH Tukang Kayu Rp 90,000.00 Rp 1,800.00
0.020 OH Tukang Batu Rp 90,000.00 Rp 1,800.00
0.020 OH Tukang Besi Rp 90,000.00 Rp 1,800.00

Sub total : Rp 19,800.00

PEKERJAAN ATAP
1 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP ASBES/SPANDEK Rp 156,525.00
Bahan
1.5 m1 Profil C-75.08 Rp 17,700.00 Rp 26,550.00
2.2 m1 Profil C-75.06 Rp 11,500.00 Rp 25,300.00
28 bh Baut (Srew driver Rp 500.00 Rp 14,000.00
1.5 bh Dinabolt Rp 1,250.00 Rp 1,875.00
3.4 m1 Reng Rp 9,500.00 Rp 32,300.00
Sub Total Rp 100,025.00
Upah
0.2 OH Pekerja Rp 80,000.00 Rp 16,000.00
0.45 OH Tukang Kayu Rp 90,000.00 Rp 40,500.00

Sub Total Rp 56,500.00

2 1 M2 Atap Spandek Zincalume Rp 96,500.00


Bahan
1.1 m2 Atap Spandek Zincalume Rp 55,000.00 Rp 60,500.00
6 bh Screw Cteks 12-4 x 5 Rp 1,500.00 Rp 9,000.00
2 bh Screw Cteks 10 x 16-16 Rp 1,000.00 Rp 2,000.00
Sub Total Rp 71,500.00
Upah
0.2 OH Pekerja Rp 80,000.00 Rp 16,000.00
0.1 OH Tukang Kayu Rp 90,000.00 Rp 9,000.00
ANALISA HARGA SATUAN STRUKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

No Uraian Harga Satuan Jumlah Harga

Sub Total Rp 25,000.00

3 1 M^1 Papan Lisplang GRC Rp 76,670.00


Bahan An. SNI ( Revisi ) 6.50.1
1.050 m Lisplank GRC Rp 45,000.00 Rp 47,250.00
0.05 Kg Paku biasa 2" - 5" Rp 16,400.00 Rp 820.00
Sub Total Rp 48,070.00
Upah An. SNI ( Revisi ) 6.50.2
0.11 OH Pekerja Rp 80,000.00 Rp 8,800.00
0.22 OH Tukang kayu Rp 90,000.00 Rp 19,800.00

Sub Total Rp 28,600.00

4 1 M2 Peredam Panas Atap Rp 129,445.00


Bahan
1.1 m2 Aluminium foil 3mm Rp 8,450.00 Rp 9,295.00
1.1 m2 Glass wool tebal 2,5 cm Rp 31,500.00 Rp 34,650.00
1.1 m2 Roofmesh Type 2215 dia 1,6mm ( 50x50 mm) Rp 55,000.00 Rp 60,500.00
Sub Total Rp 104,445.00
Upah
0.2 OH Pekerja Rp 80,000.00 Rp 16,000.00
0.1 OH Tukang Kayu Rp 90,000.00 Rp 9,000.00

Sub Total Rp 25,000.00


ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

I. PEKERJAAN PERSIAPAN

MEMASANG BOWPLANK M'


Kayu kaso 5x7x400 Meranti campur 0.0050 m3 1,400,000 7,000
Kayu papan 3x20x400 meranti 0.0050 m3 1,200,000 6,000
paku rata-rata 0.0350 kg 16,400 574
pekerja 0.1000 org/hr 80,000 8,000

jumlah 21,574
dibulatkan 21,600

MEMASANG PAPAN NAMA PROYEK unit


Papan Kamper Samarinda 3/30 0.0250 m3 1,200,000 30,000
Balok kamper 0.0900 m3 1,500,000 135,000
Paku biasa 2" - 5 " 0.6000 kg 16,400 9,840
Meni kayu 0.7500 kg 17,500 13,125
Dempul kayu 1.0000 kg 20,000 20,000
Amplas 2.0000 lbr 6,700 13,400
Kuas 0.5000 bh 10,900 5,450
Cat kayu 3.0000 kg 55,000 165,000
Semen Portland 0.5000 sak 60,000 30,000
Pasir beton 0.0600 m3 185,000 11,100
Koral beton 0.1000 m3 185,000 18,500
Pekerja 1.0000 org/hr 80,000 80,000
Tukang Batu 0.0175 org/hr 90,000 1,575
Tukang Kayu 0.1000 org/hr 90,000 9,000
Tukang Cat 0.1000 org/hr 90,000 9,000
jumlah 550,990
dibulatkan 551,000

PENGADAAN LISTRIK DAN AIR KERJA LS


Air kerja 4.0000 bulan 21,600 86,400
Listrik kerja 4.0000 bulan 1,250,000 5,000,000
jumlah 5,086,400
dibulatkan 5,086,400

PENYUSUNAN LAPORAN & DOKUMENTASI LS


Kamera SLR (Digital) 4.0000 sewa/hr 150,000 600,000
CD copy soft file foto image 2.0000 bh 10,000 20,000
Foto printing uk.3R 30.0000 lbr 1,500 45,000
Foto album 4.0000 bh 500 2,000
Tukang foto 2.0000 OH 150,000 300,000
jumlah 967,000
dibulatkan 967,000

II PEKERJAAN PONDASI

CERUCUK DOLKEN TTK


dolken 0.5000 btg 14,300 7,150
pekerja 0.1000 org/hr 80,000 8,000

jumlah 15,150
dibulatkan 15,200

MEMASANG PONDASI AANSTAMPING M3


ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


batu kali 1.1000 m3 180,000 198,000
pasir urug 0.4320 m3 114,500 49,464
tukang batu 0.3900 org/hr 90,000 35,100

pekerja 0.7800 org/hr 80,000 62,400

jumlah 344,964
dibulatkan 345,000

MEMASANG PONDASI BATU KALI 1:4 M3


batu kali 1.1000 m3 180,000 198,000
semen PC ( 50 kg ) tiga roda 2.6056 zak 60,000 156,336
pasir pasang 0.5200 m3 174,000 90,480
tukang batu 0.6000 org/hr 90,000 54,000

pekerja 1.5000 org/hr 80,000 120,000

jumlah 618,816
dibulatkan 618,800

MEMASANG ROLAG BATA t=20 CM M'


batu bata merah (press) 24.7934 bh 550 13,636
semen PC ( 50 kg ) tiga roda 0.6000 zak 60,000 36,000
pasir pasang 0.1040 m3 174,000 18,096
tukang batu 0.1000 org/hr 90,000 9,000

pekerja 0.1000 org/hr 80,000 8,000

jumlah 84,732
dibulatkan 84,700

III PEKERJAAN PASANGAN


DINDING 1/2 BATU BATA 1:2 (BATA PRESS) M2
batu bata merah 70.0000 bh 550 38,500
semen PC ( 50 kg ) tiga roda 0.3790 zak 60,000 22,740
pasir pasang 0.0380 m3 174,000 6,612
alat bantu pas bata 1.0000 ls 2,036 2,036
tukang batu 0.1000 org/hr 90,000 9,000

pekerja 0.3200 org/hr 80,000 25,600

jumlah 104,488
dibulatkan 104,500

DINDING 1/2 BATU BATA 1:4 M2


(bata press)
batu bata merah 70.0000 bh 550 38,500
semen PC ( 50 kg ) tiga roda 0.1936 zak 60,000 11,616
pasir pasang 0.0450 m3 174,000 7,830
alat bantu pas bata 1.0000 ls 1,738 1,738
tukang batu 0.1000 org/hr 90,000 9,000

pekerja 0.3200 org/hr 80,000 25,600

jumlah 94,284
dibulatkan 94,300
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH

PLESTERAN DINDING 1:5 M2


tebal 15 mm
semen PC ( 50 kg ) tiga roda 0.2400 zak 60,000 14,400
pasir pasang 0.0190 m3 174,000 3,306
alat bantu plester ddg 1.0000 ls 531 531
tukang batu 0.1500 org/hr 90,000 13,500

pekerja 0.2000 org/hr 80,000 16,000

jumlah 47,737
dibulatkan 47,700

PLESTERAN BETON ad 1:3 tebal 15 mm M2


semen PC ( 50 kg ) tiga roda 0.2400 zak 60,000 14,400
pasir pasang 0.0190 m3 174,000 3,306
alat bantu plester ddg 1.0000 ls 531 531
tukang batu 0.2000 org/hr 90,000 18,000

pekerja 0.1500 org/hr 80,000 12,000

jumlah 48,237
dibulatkan 48,200

ACIAN M2
semen PC ( 50 kg ) tiga roda 0.1400 zak 60,000 8,400
alat bantu acian 1.0000 ls 840 840
tukang batu 0.1000 org/hr 90,000 9,000

pekerja 0.0500 org/hr 80,000 4,000

jumlah 22,240
dibulatkan 22,200

TALI AIR, SIKUAN, SKONENGAN, BENANGAN M'


semen PC ( 50 kg ) tiga roda 0.0300 zak 60,000 1,800
alat bantu tali air 1.0000 ls 180 180
tukang batu 0.0800 org/hr 90,000 7,200

pekerja 0.0600 org/hr 80,000 4,800

jumlah 13,980
dibulatkan 14,000

IV PEKERJAAN BETON
MEMBUAT LANTAI KERJA ad 1:3:5 M3
semen PC ( 50 kg ) tiga roda 2.5000 zak 60,000 150,000
pasir beton 0.5200 m3 185,000 96,200
split 0.8700 m3 185,000 160,950
tukang batu 0.8000 org/hr 90,000 72,000

pekerja 0.8000 org/hr 80,000 64,000

jumlah 543,150
dibulatkan 543,200
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


Lantai kerja 1:3:5 , t 5 cm ; 1 M2 0.0500 m3 543,200 27,160
dibulatkan 27,200

BEKISTING BETON PRAKTIS M2


triplek 4x8 ft, 9 mm 0.2333 lbr 190,000 44,333
paku rata-rata 0.4000 kg 16,400 6,560
Kayu kaso 5x7x400 Meranti campur 0.0204 m3 1,400,000 28,519
kayu balok 8x12x400 Meranti campur 0.0300 m3 1,500,000 45,000
form tie type B 0.2500 bh 14,500 3,625
beton decking 4.0000 bh 15,000 60,000
tukang kayu 0.3000 org/hr 90,000 27,000

pekerja 0.2000 org/hr 80,000 16,000

jumlah 231,037
dibulatkan 231,000

V PEKERJAAN PINTU DAN JENDELA


MEMASANG KUSEN ALUMUNIUM 3 INCH M'
alumunium profil 3" 1.0000 m' 120,000 120,000
sekrup fixer 2.0000 bh 400 800
sealant 0.0600 tube 45,000 2,700
pekerja 0.0430 org/hr 80,000 3,440
tukang alumunium 0.0430 org/hr 90,000 3,870

jumlah 130,810
dibulatkan 130,800

MEMASANG ALUMUNIUM KISI KREPYAK M2


profil alumunium kisi /krepyak 1.0000 m' 21,000 21,000
pekerja 0.0150 org/hr 80,000 1,200
tukang kaca/alumunium 0.0150 org/hr 90,000 1,350

jumlah 23,550
dibulatkan 23,600

MEMASANG KACA CLEAR 5 MM M2


kaca clear 5 mm ; asahimas, mulia setara 1.0500 m2 147,300 154,665
sealant - tube 45,000 -
pekerja 0.0150 org/hr 80,000 1,200
tukang kaca/alumunium 0.1500 org/hr 90,000 13,500

jumlah 169,365
dibulatkan 169,400

MEMASANG KUSEN DAN DAUN PINTU TYPE P1 BH


Daun pintu double teakwood finish HPL - unit 850,000 -
Kusen Alumunium 3" CA 9.1200 m' 130,800 1,192,896
Jalusi Alumunium Krepyak 1.2600 m2 23,600 29,736
Frame pintu aluminium 11.2000 m' 154,000 1,724,800
Kaca clear 5 mm 2.1808 m2 169,400 369,428
Sealant kaca 9.8400 m' 5,500 54,120
Sealant kusen 7.6400 m' 6,705 51,226
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


Lever Handle pintu ex.lokal 2.0000 psg 185,000 370,000
Engsel pintu 4" S/S 2BB ex.lokal 2.0000 psg 46,000 92,000
Kunci pintu ex.lokal 1.0000 bh 85,000 85,000
tukang kaca/aluminium 4.2500 org/hr 90,000 382,500

pekerja 6.3750 org/hr 80,000 510,000

jumlah 4,861,706
dibulatkan 4,861,700

MEMASANG KUSEN DAN DAUN PINTU TYPE P2 BH


Daun pintu double triplek 6mm finish duco - unit 600,000 -
Kusen Alumunium 3" CA 6.9200 m' 130,800 905,136
frame pintu allumunium 2.0640 m2 154,000 317,856
Kaca clear 5 mm 1.4448 m2 169,400 244,749
Sealant kaca 10.1200 m' 5,500 55,660
Sealant kusen 6.0400 m' 6,705 40,498
Lever Handle pintu ex.lokal 1.0000 psg 185,000 185,000
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg 46,000 46,000
Engsel jendela 3" S/S 2BB ex.lokal 1.0000 psg 46,000 46,000
Kunci pintu ex.lokal 1.0000 bh 85,000 85,000
Rambuncis ex.dekson 1.0000 bh 11,000 11,000
tukang kaca 2.1250 org/hr 90,000 191,250

pekerja 3.1875 org/hr 80,000 255,000

jumlah 2,383,149
dibulatkan 2,383,100

MEMASANG KUSEN DAN DAUN PINTU TYPE P3 (Spandrel) BH


Daun pintu alumunium spandrel 1.0000 unit 2,650,000 2,650,000
Kusen Alumunium 3" CA 6.9200 m' 130,800 905,136
frame pintu allumunium - m2 154,000 -
Kaca clear 5 mm 0.2800 m2 169,400 47,432
Sealant kaca 2.2000 m' 5,500 12,100
Sealant kusen 6.0400 m' 6,705 40,498
Lever Handle pintu ex.lokal - psg 185,000 -
Engsel pintu 4" S/S 2BB ex.lokal 1.0000 psg 46,000 46,000
Engsel jendela 3" S/S 2BB ex.lokal - psg 46,000 -
Kunci pintu ex.lokal - bh 85,000 -
tukang kaca 0.5000 org/hr 90,000 45,000

pekerja 0.7500 org/hr 80,000 60,000

jumlah 3,806,166
dibulatkan 3,806,200
MEMASANG ROLLING DOOR T=0.8 Galvalume BH
Pintu Rolling Door Besi Galvalum t 0,8 Lengkap 9.2800 m2 550,000 5,104,000
Upah Pasang Roliing door 9.2800 m2 90,000 835,200
jumlah 5,939,200
dibulatkan 5,939,200

MEMASANG KUSEN DAN DAUN JENDELA TYPE J.1 BH


Kusen Alumunium 3" CA 11.0100 m' 130,800 1,440,108
frame jendela allumunium 2.2400 m2 154,000 344,960
Kaca clear 5 mm 2.3680 m2 169,400 401,139
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


Sealant kaca 11.4400 m' 5,500 62,920
Sealant kusen 5.8200 m' 6,705 39,023
Engsel Casement 24" 2.0000 set 150,000 300,000
rambuncis lokal 2.0000 bh 11,000 22,000
tukang kaca 0.5000 org/hr 90,000 45,000

pekerja 0.7500 org/hr 80,000 60,000

jumlah 2,715,150
dibulatkan 2,715,200

MEMASANG JENDELA BOVENLICH B1 1BH


alumunium 3" 2.1600 m' 130,800 282,528
kaca clear 5 mm 0.2176 m2 169,400 36,861
sealant kaca 2.1600 m' 5,500 11,880
jumlah 331,269
dibulatkan 331,300

MEMASANG KUSEN DAN DAUN JENDELA TYPE J.2 BH


Kusen Alumunium 3" CA 13.2300 m' 130,800 1,730,484
frame jendela allumunium 1.1200 m2 154,000 172,480
Kaca clear 5 mm 4.2194 m2 169,400 714,770
Sealant kaca 14.8720 m' 5,500 81,796
Sealant kusen 7.5660 m' 5,500 41,613
Engsel Casement 24" 1.0000 set 150,000 150,000
rambuncis lokal 1.0000 bh 11,000 11,000
tukang kaca 0.5000 org/hr 90,000 45,000

pekerja 0.7500 org/hr 80,000 60,000

jumlah 3,007,143
dibulatkan 3,007,100

MEMASANG KUSEN DAN DAUN JENDELA TYPE J.3 BH


Kusen Alumunium 3" CA 7.5400 m' 130,800 986,232
frame jendela allumunium - m2 154,000 -
Kaca clear 5 mm 2.3220 m2 169,400 393,347
Sealant kaca 8.6200 m' 5,500 47,410
Sealant kusen 6.4600 m' 5,500 35,530
Engsel Casement 24" - set 150,000 -
rambuncis lokal - bh 11,000 -
tukang kaca 0.5000 org/hr 90,000 45,000

pekerja 0.7500 org/hr 80,000 60,000

jumlah 1,567,519
dibulatkan 1,567,500

VI PEKERJAAN PLAFOND
MEMASANG PLAFOND GYPSUM TILE M2
gypsum board 4x8 ft , t = 9 mm 0.3472 lbr 60,000 20,833
hollow 20 x 40 x 0.35 mm 0.8000 btg 30,000 24,000
hollow 40 x 40 x 0.35 mm 0.5000 btg 25,000 12,500
penggantung plafond 1.0000 bh 1,500 1,500
compound 0.1000 sak 60,000 6,000
textile tape 0.2000 rol 4,000 800
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


skrup gypsum 15.0000 bh 200 3,000
tukang gypsum 0.1000 org/hr 90,000 9,000

pekerja 0.1000 org/hr 80,000 8,000

jumlah 85,633
dibulatkan 85,600

PLAFOND GRC + RANGKA HOLLOW GALVALUM M2


panel GRC 4x8 ft , t - 4.5 mm 0.3472 lbr 45,000 15,625
hollow 20 x 40 x 0.4 mm 0.8000 btg 30,000 24,000
hollow 40 x 40 x 0.4 mm 0.5000 btg 25,000 12,500
penggantung plafond 1.0000 bh 1,500 1,500
compound 0.1000 kg 60,000 6,000
textile tape 0.2000 rol 4,000 800
skrup gypsum 15.0000 bh 200 3,000
tukang gypsum 0.1000 org/hr 90,000 9,000

pekerja 0.1000 org/hr 80,000 8,000

jumlah 80,425
dibulatkan 80,400

LIST GYPSUM UK. 5x5 CM M'


List gypsum 5 x 5 1.0500 m' 18,000 18,900
compound 0.0250 kg 60,000 1,500
tukang gypsum 0.0600 org/hr 90,000 5,400

pekerja 0.0200 org/hr 80,000 1,600

jumlah 27,400
dibulatkan 27,400

VII PEKERJAAN PELAPIS LANTAI DAN DINDING

MEMASANG LANTAI KERAMIK 20x20 m2


adukan 1:5, tebal 5 cm
lantai keramik 20x20 1.1000 m2 45,000 49,500
pasir pasang 0.0300 m3 174,000 5,220
semen PC ( 50 kg ) tiga roda 0.2300 zak 60,000 13,800
semen isian naat 0.2000 kg 11,700 2,340
tukang batu 0.1350 org/hr 90,000 12,150

pekerja 0.2700 org/hr 80,000 21,600

jumlah 104,610
dibulatkan 104,600

MEMASANG LANTAI KERAMIK 30x30 m2


adukan 1:5, tebal 5 cm
lantai keramik 30x30 1.1000 m2 57,000 62,700
pasir pasang 0.0300 m3 174,000 5,220
semen PC ( 50 kg ) tiga roda 0.2300 zak 60,000 13,800
semen isian naat 0.2000 kg 11,700 2,340
tukang batu 0.1350 org/hr 90,000 12,150
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


pekerja 0.2700 org/hr 80,000 21,600

jumlah 117,810
dibulatkan 117,800

MEMASANG KERAMIK LANTAI UK. 40x40 M2


adukan 1:5, tebal 5 cm
lantai keramik 40x40 1.1000 m2 75,000 82,500
pasir pasang 0.0300 m3 174,000 5,220
semen PC ( 50 kg ) tiga roda 0.2300 zak 60,000 13,800
semen isian naat 0.2000 kg 11,700 2,340
tukang batu 0.1350 org/hr 90,000 12,150

pekerja 0.2700 org/hr 80,000 21,600

jumlah 137,610
dibulatkan 137,600

MEMASANG DINDING KERAMIK 30 x 60 M2


adukan 1:5, tebal 5 cm
dinding keramik 20 x 40 1.0500 m2 85,000 89,250
pasir pasang 0.0180 m3 174,000 3,132
semen PC ( 50 kg ) tiga roda 0.1860 zak 60,000 11,160
semen isian naat 0.1000 kg 11,700 1,170
tukang batu 0.3200 org/hr 90,000 28,800

pekerja 0.5000 org/hr 80,000 40,000

jumlah 173,512
dibulatkan 173,500

MEMASANG PLINT KERAMIK UK. 10x40 M'


lantai keramik 10x40 2.5000 bh 5,700 14,250
pasir pasang 0.0020 m3 174,000 348
semen PC ( 50 kg ) tiga roda 0.0200 zak 60,000 1,200
tukang batu 0.0900 org/hr 90,000 8,100

pekerja 0.0900 org/hr 80,000 7,200

jumlah 31,098
dibulatkan 31,100

MEMASANG BATU ALAM M2


adukan 1:5, tebal 5 cm
batu alam candi 1.0500 m2 180,000 189,000
pasir pasang 0.0180 m3 174,000 3,132
semen PC ( 50 kg ) tiga roda 0.1860 zak 60,000 11,160
tukang batu 0.3200 org/hr 90,000 28,800

pekerja 0.5000 org/hr 80,000 40,000

jumlah 272,092
dibulatkan 272,100

VIII PEKERJAAN PENGECATAN


CAT DINDING DALAM CATYLAC M2
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


(dinding baru , 3 lapis)
plamur tembok 0.3000 kg 48,470 14,541
amplas 0.5000 lbr 6,700 3,350
cat dasar alkali 0.1000 kg 65,400 6,540
cat tembok dalam Catylac 0.3000 kg 75,500 22,650
kuas roll 0.0250 bh 23,900 598
tukang cat 0.0800 org/hr 90,000 7,200

pekerja 0.0400 org/hr 80,000 3,200

jumlah 58,079
dibulatkan 58,050

CAT DINDING LUAR MOWILEX M2


(dinding baru , 3 lapis)
plamur tembok 0.1905 kg 48,470 9,232
amplas 0.2500 lbr 6,700 1,675
cat dasar alkali 0.0952 kg 65,400 6,229
cat tembok mowilex 0.3000 kg 75,500 22,650
kuas roll 0.0238 bh 23,900 569
tukang cat 0.0800 org/hr 90,000 7,200

pekerja 0.0400 org/hr 80,000 3,200

jumlah 50,755
dibulatkan 50,750

CAT PLAFOND VINILEX M2


(dinding baru , 3 lapis)
amplas 0.5000 lbr 6,700 3,350
cat vililex putih 0.3000 kg 45,000 13,500
kuas roll 0.0250 bh 23,900 598
tukang cat 0.0800 org/hr 90,000 7,200

pekerja 0.0400 org/hr 80,000 3,200

jumlah 27,848
dibulatkan 27,800

CAT MINYAK M2
amplas 0.5000 lbr 6,700 3,350
cat besi Glotex 0.2500 kg 55,000 13,750
meni besi 0.1670 kg 27,500 4,593
thinner impala 0.1500 ltr 11,500 1,725
kuas besar 0.0476 bh 10,900 519
tukang cat 0.0667 org/hr 90,000 6,000

pekerja 0.0333 org/hr 80,000 2,667

jumlah 32,603
dibulatkan 32,600

IX PEKERJAAN SANITAIR
WASTAFEL TANAM BH
wastafel gantung + accessories ex.lokal 1.0000 bh 625,000 625,000
sealant 0.5000 bh 44,700 22,350
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


tukang plambing 1.2500 org/hr 90,000 112,500

pekerja 0.2500 org/hr 80,000 20,000

jumlah 779,850
dibulatkan 779,900

CLOSED JONGKOK BH
closed jongkok 1.0000 bh 350,000 350,000
semen putih ( 50 kg ) 0.0200 zak 60,000 1,200
pas bata 1.6000 m2 94,300 150,880
plesteran 1:2 1.0000 m2 48,200 48,200
tukang batu 0.3000 org/hr 90,000 27,000

pekerja 0.3000 org/hr 80,000 24,000

jumlah 601,280
dibulatkan 601,280

MEMASANG KRAN AIR LOKAL BH


kran air lokal 1.0000 bh 35,000 35,000
seal tape 0.5000 bh 15,000 7,500
tukang plambing 0.0300 org/hr 90,000 2,700

pekerja 0.2500 org/hr 80,000 20,000

jumlah 65,200
dibulatkan 65,200

MEMASANG CERMIN WASTAFEL (Uk. 100x200) BH


kaca cermin 5 mm 1.0000 m2 135,000 135,000
sekrup fisher 6.0000 bh 400 2,400
bevel kaca 3.0000 m' 16,000 48,000
tukang plambing 0.4000 org/hr 90,000 36,000

pekerja 0.3000 org/hr 80,000 24,000

jumlah 245,400
dibulatkan 245,400

X PEKERJAAN LAIN-LAIN

LOGO DAN TULISAN unit


Logo (tampak muka gedung) 1.0000 set 2,000,000 2,000,000
jumlah 2,000,000
dibulatkan 2,000,000

TRALIS VENTILASI m1
Besi Hollow 40 x 40 4.0000 btng 30,000 120,000
Besi Hollow 20 x 40 8.0000 btng 25,000 200,000
Finishing Cat minyak 3.3250 m2 32,600 108,395
upah pabrikasi dan pasang 6.6500 m1 91,300 607,145
jumlah 1,035,540
harga per meter 155,720
dibulatkan 155,700
ANALISA HARGA SATUAN ARSITEKTUR

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


PEMBERI BANTU : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGAR : 2020

NO JENIS PEKERJAAN VOLUME SATUAN HARGA JUMLAH


LIST PROFILAN DINDING, KUSEN LEBAR 10 CM m1
Pesteran Profilan lebar 10 cm tebal 5 cm 0.2000 m2 144,600 28,920
Acian Profilan 0.2000 m2 66,600 13,320
jumlah 42,240
dibulatkan 42,200

MEMASANG BUIS BETON 30 M'


galian tanah 0.6400 m3 96,000 61,440
urug tanah kembali 0.1850 m3 30,000 5,550
urug pasir 0.0650 m3 165,950 10,787
buis beton ø 30 cm, panj.0.50 m 0.8333 m' 150,000 125,000
pasir pasang 0.0200 m3 174,000 3,480
semen PC ( 50 kg ) tiga roda 0.1000 zak 60,000 6,000
upah pas saluran 1.0000 m' 31,839 31,839
jumlah 244,095
dibulatkan 244,050
MEMASANG SALURAN KELILING M'
galian tanah 0.2000 m3 96,000 19,200
urug tanah kembali 0.0600 m3 30,000 1,800
urug pasir 0.0200 m3 165,950 3,319
pasangan Batu bata 0.7000 m2 94,300 66,010
Plesteran 1.1000 m2 47,700 52,470
Acian 1.1000 m2 22,200 24,420
jumlah 167,219
dibulatkan 167,200

SEPTIC TANK DAN REMBESAN unit


Galian tanah Septictank & rembesan 7.5000 m3 96,000 720,000
Pasir urug 0.2100 m3 165,950 34,850
Lantai kerja 2.2500 m3 27,200 61,200
Pasang bata 1 Pc : 2 Psr 15.0000 m2 104,500 1,567,500
Pelat beton penutup dan balok 0.3000 m3 1,004,390 301,317
Pipa PVC 3" AW & perlengkapannya 7.5000 m' 106,718 800,381
Plesteran 1 Pc : 3 Psr 30.0000 m2 48,200 1,446,000
Pasangan ijuk 5.0000 ikat 10,000 50,000
Urugan kerikil 3,5 cm 1.0500 m3 243,500 255,675
Pipa PVC 1½" AW di lubang 3.0000 m' 39,870 119,610
Urugan kembali 1.1300 m3 30,000 33,900
Pembantu Tukang 4.0000 org 80,000 320,000
Tukang batu 3.0000 org 90,000 270,000

jumlah 5,980,433
dibulatkan 5,980,400

Upah pabrikasi dan Pemasangan tralis m1


sewa alat las 0.1500 hr 465,000 69,750
tukang besi 0.1500 org/hr 90,000 13,500

pekerja 0.1000 org/hr 80,000 8,000

jumlah 91,250
dibulatkan 91,300
ANALISA HARGA PEK. ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


Lokasi : PONDOK PESANTREN NURUDZ DZIKRI KOTA SERANG
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

NO KOEFISIEN SAT URAIAN HARGA JUMLAH


1 Memasang 1 buah instalasi titik lampu / penerangan
Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. 8,000.00 = Rp 64,000.00
8.000 m Conduit pipa dia. 20 @ Rp. 5,500.00 = Rp 44,000.00
5.000 % Perlengkapan instalasi = Rp 5,400.00
Sub total : = Rp 113,400.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 80,000.00 = Rp 16,000.00
0.180 OH Tukang listrik @ Rp. 90,000.00 = Rp 16,200.00

Sub total : = Rp 32,200.00


Total upah+bahan : = Rp 145,600.00

2 Memasang 1 buah instalasi titik AC


Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. 8,000.00 = Rp 64,000.00
8.000 m Conduit pipa dia. 20 @ Rp. 5,500.00 = Rp 44,000.00
5.000 % Perlengkapan instalasi = Rp 5,400.00
Sub total : = Rp 113,400.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 80,000.00 = Rp 16,000.00
0.180 OH Tukang listrik @ Rp. 90,000.00 = Rp 16,200.00

Sub total : = Rp 32,200.00


Total upah+bahan : = Rp 145,600.00

3 Memasang 1 m' instalasi kabel feeder NYY 4x10 mm2


Bahan An. SNI ( Revisi ) 6.1.1
1.000 m Kabel NYY 4x10 mm2 @ Rp. 26,000.00 = Rp 26,000.00
1.000 m Conduit pipa dia. 20 @ Rp. 5,500.00 = Rp 5,500.00
5.000 % Perlengkapan instalasi = Rp 1,575.00
Sub total : = Rp 33,075.00
Upah An. SNI ( Revisi ) 6.1.2
0.200 OH Pekerja @ Rp. 80,000.00 = Rp 16,000.00
0.180 OH Tukang listrik @ Rp. 90,000.00 = Rp 16,200.00

Sub total : = Rp 32,200.00


Total upah+bahan : = Rp 65,275.00
NO KOEFISIEN SAT URAIAN HARGA JUMLAH
4 Memasang Stop Kontak daya
Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak 6 A @ Rp. 28,800.00 = Rp 28,800.00
5.000 % Perlengkapan instalasi = Rp 1,440.00
Sub total : = Rp 30,240.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 80,000.00 = Rp 8,000.00
0.070 OH Tukang listrik @ Rp. 90,000.00 = Rp 6,300.00

Sub total : = Rp 14,300.00


Total upah+bahan : = Rp 44,540.00

5 Memasang Stop Kontak Ganda


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak Ganda @ Rp. 28,800.00 = Rp 28,800.00
5.000 % Perlengkapan instalasi = Rp 1,440.00
Sub total : = Rp 30,240.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 80,000.00 = Rp 8,000.00
0.070 OH Tukang listrik @ Rp. 90,000.00 = Rp 6,300.00

Sub total : = Rp 14,300.00


Total upah+bahan : = Rp 44,540.00

6 Memasang Stop Kontak AC


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak AC @ Rp. 60,000.00 = Rp 60,000.00
5.000 % Perlengkapan instalasi = Rp 3,000.00
Sub total : = Rp 63,000.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 80,000.00 = Rp 8,000.00
0.070 OH Tukang listrik @ Rp. 90,000.00 = Rp 6,300.00

Sub total : = Rp 14,300.00


Total upah+bahan : = Rp 77,300.00

NO KOEFISIEN SAT URAIAN HARGA JUMLAH


7 Memasang Grounding (max 2 Ohm)
Bahan An. SNI ( Revisi ) 6.18.1
10.000 m' NYA 1 x 50 mm2 @ Rp. 9,000.00 = Rp 90,000.00
3.000 m' Pipa galvanis ø 1 1/2" @ Rp. 29,166.67 = Rp 87,500.00
2.000 bh Split tembaga @ Rp. 60,000.00 = Rp 120,000.00
4.000 bh Klem tembaga @ Rp. 5,000.00 = Rp 20,000.00
5.000 % Perlengkapan instalasi = Rp 15,875.00
Sub total : = Rp 333,375.00
Upah An. SNI ( Revisi ) 6.18.2
0.100 OH Pekerja @ Rp. 80,000.00 = Rp 8,000.00
0.070 OH Tukang listrik @ Rp. 90,000.00 = Rp 6,300.00
Sub total : = Rp 14,300.00
Total upah+bahan : = Rp 347,675.00

8 Memasang Saklar Tunggal


Bahan An. SNI ( Revisi ) 6.21.1
1.000 bh Saklar Tunggal @ Rp. 28,800.00 = Rp 28,800.00
5.000 % Perlengkapan instalasi = Rp 1,440.00
Sub total : = Rp 30,240.00
Upah An. SNI ( Revisi ) 6.21.2
0.150 OH Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.115 OH Tukang listrik @ Rp. 90,000.00 = Rp 10,350.00

Sub total : = Rp 22,350.00


Total upah+bahan : = Rp 52,590.00

9 Memasang Saklar Ganda


Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar ganda @ Rp. 34,000.00 = Rp 34,000.00
5.000 % Perlengkapan instalasi = Rp 1,700.00
Sub total : = Rp 35,700.00
Upah An. SNI ( Revisi ) 6.22.2
0.150 OH Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.115 OH Tukang listrik @ Rp. 90,000.00 = Rp 10,350.00

Sub total : = Rp 22,350.00


Total upah+bahan : = Rp 58,050.00

NO KOEFISIEN SAT URAIAN HARGA JUMLAH


10 Memasang Lampu TKO 2x36 W
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu TKO 2 x 36 W @ Rp. 250,000.00 = Rp 250,000.00
5.000 % Perlengkapan instalasi = Rp 12,500.00
Sub total : = Rp 262,500.00
Upah An. SNI ( Revisi ) 6.22.2
0.166 OH Pekerja @ Rp. 80,000.00 = Rp 13,280.00
0.166 OH Tukang listrik @ Rp. 90,000.00 = Rp 14,940.00

Sub total : = Rp 28,220.00


Total upah+bahan : = Rp 290,720.00
11 Memasang Exhaust Fan
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh ExhausFAN @ Rp. 650,000.00 = Rp 650,000.00
5.000 % Perlengkapan instalasi = Rp 32,500.00
Sub total : = Rp 682,500.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 80,000.00 = Rp 13,280.00
0.166 OH Tukang listrik @ Rp. 90,000.00 = Rp 14,940.00

Sub total : = Rp 28,220.00


Total upah+bahan : = Rp 710,720.00
12 Memasang Kipas Angin Gantung
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Kipas Angin Gantung 48'' besi @ Rp. 850,000.00 = Rp 850,000.00
5.000 % Perlengkapan instalasi = Rp 42,500.00
Sub total : = Rp 892,500.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 80,000.00 = Rp 13,280.00
0.166 OH Tukang listrik @ Rp. 90,000.00 = Rp 14,940.00

Sub total : = Rp 28,220.00


Total upah+bahan : = Rp 920,720.00

13 Memasang AC split wall 2 PK


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh AC split wall 2 PK @ Rp. 4,000,000.00 = Rp 4,000,000.00
5.000 % Perlengkapan instalasi = Rp 200,000.00
Sub total : = Rp 4,200,000.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 80,000.00 = Rp 13,280.00
0.166 OH Tukang listrik @ Rp. 90,000.00 = Rp 14,940.00

Sub total : = Rp 28,220.00


Total upah+bahan : = Rp 4,228,220.00

NO KOEFISIEN SAT URAIAN HARGA JUMLAH


14 Memasang Lampu Baret 18 W / 22 W
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Baret 18 W / 22W @ Rp. 365,000.00 = Rp 365,000.00
5.000 % Perlengkapan instalasi = Rp 18,250.00
Sub total : = Rp 383,250.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 80,000.00 = Rp 13,280.00
0.166 OH Tukang listrik @ Rp. 90,000.00 = Rp 14,940.00

Sub total : = Rp 28,220.00


Total upah+bahan : = Rp 411,470.00

15 Memasang Downlight E27ESS 8 Watt + Fitting


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Downlight E27ESS 8 Watt @ Rp. 150,000.00 = Rp 150,000.00
1.000 bh Fitting @ Rp. 15,000.00 = Rp 15,000.00
5.000 % Perlengkapan instalasi @ Rp. = Rp 8,250.00
Sub total : = Rp 173,250.00
Upah An. SNI ( Revisi ) 6.35.2
0.166 OH Pekerja @ Rp. 80,000.00 = Rp 13,280.00
0.166 OH Tukang listrik @ Rp. 90,000.00 = Rp 14,940.00

Sub total : = Rp 28,220.00


Total upah+bahan : = Rp 201,470.00

15 Memasang Panel Distribusi


Bahan An. SNI ( Revisi ) 6.55.1
1.000 bh Panel Distribusi @ Rp. 775,000.00 = Rp 775,000.00
5.000 % Perlengkapan instalasi = Rp 38,750.00
Sub total : = Rp 813,750.00
Upah An. SNI ( Revisi ) 6.55.2
2.500 OH Pekerja @ Rp. 80,000.00 = Rp 200,000.00
3.500 OH Tukang listrik @ Rp. 90,000.00 = Rp 315,000.00

Sub total : = Rp 515,000.00


Total upah+bahan : = Rp 1,328,750.00

ANALISA HARGA PEK. PLUMBING

Pekerjaan : PEMBANGUNAN WORKSHOP BLK KOMUNITAS


Lokasi : PONDOK PESANTREN DAAR ET TOHIRIN KAB. TANGERANG
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
Tahun Anggaran : 2017

NO KOEFISIEN SAT URAIAN HARGA JUMLAH


1 Memasang 1 m' Pipa PVC tipe AW dia 1/2"
Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 1/2" @ Rp. 6,250.00 = Rp 7,500.00
35.000 % Perlengkapan instalasi = Rp 2,625.00
Sub total : = Rp 10,125.00
Upah An. SNI RSNIT-15-2002
0.036 OH Pekerja @ Rp. 80,000.00 = Rp 2,880.00
0.060 OH Tukang Plumbing @ Rp. 90,000.00 = Rp 5,400.00

Sub total : = Rp 8,280.00


Total upah+bahan : = Rp 18,405.00

2 Memasang 1 m' Pipa PVC tipe AW dia 3/4"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 3/4" @ Rp. 11,250.00 = Rp 13,500.00
35.000 % Perlengkapan instalasi = Rp 4,725.00
Sub total : = Rp 18,225.00
Upah An. SNI RSNIT-15-2002
0.036 OH Pekerja @ Rp. 80,000.00 = Rp 2,880.00
0.060 OH Tukang Plumbing @ Rp. 90,000.00 = Rp 5,400.00

Sub total : = Rp 8,280.00


Total upah+bahan : = Rp 26,505.00

3 Memasang 1 m' Pipa PVC tipe AW dia 1 1/2"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 1 1/2" @ Rp. 19,500.00 = Rp 23,400.00
35.000 % Perlengkapan instalasi = Rp 8,190.00
Sub total : = Rp 31,590.00
Upah An. SNI RSNIT-15-2002
0.036 OH Pekerja @ Rp. 80,000.00 = Rp 2,880.00
0.060 OH Tukang Plumbing @ Rp. 90,000.00 = Rp 5,400.00
Sub total : = Rp 8,280.00
Total upah+bahan : = Rp 39,870.00

NO KOEFISIEN SAT URAIAN HARGA JUMLAH


4 Memasang 1 m' Pipa PVC tipe AW dia 2"
Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 2" @ Rp. 24,250.00 = Rp 29,100.00
35.000 % Perlengkapan instalasi = Rp 10,185.00
Sub total : = Rp 39,285.00
Upah An. SNI RSNIT-15-2002
0.054 OH Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 OH Tukang Plumbing @ Rp. 90,000.00 = Rp 8,100.00

Sub total : = Rp 12,420.00


Total upah+bahan : = Rp 51,705.00

5 Memasang 1 m' Pipa PVC tipe AW dia 3"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 3" @ Rp. 54,375.00 = Rp 65,250.00
35.000 % Perlengkapan instalasi = Rp 22,837.50
Sub total : = Rp 88,087.50
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. 80,000.00 = Rp 6,480.00
0.135 OH Tukang Plumbing @ Rp. 90,000.00 = Rp 12,150.00

Sub total : = Rp 18,630.00


Total upah+bahan : = Rp 106,717.50

6 Memasang 1 m' Pipa PVC tipe AW dia 4"


Bahan An. SNI RSNIT-15-2002
1.200 m Pipa PVC AW 4" @ Rp. 66,250.00 = Rp 79,500.00
35.000 % Perlengkapan instalasi = Rp 27,825.00
Sub total : = Rp 107,325.00
Upah An. SNI RSNIT-15-2002
0.081 OH Pekerja @ Rp. 80,000.00 = Rp 6,480.00
0.135 OH Tukang Plumbing @ Rp. 90,000.00 = Rp 12,150.00

Sub total : = Rp 18,630.00


Total upah+bahan : = Rp 125,955.00
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)

I. MATERIAL ALAM
batu bata merah bh 550
batu kali m3 180,000
split m3 185,000
beton decking bh 15,000
pasir beton m3 185,000
pasir pasang m3 174,000
pasir urug m3 114,500
tanah urug (lokal) m3 50,000

II. SEMEN
semen PC ( 50 kg ) kg 1,200
semen PC ( 50 kg ) zak 60,000
semen putih ( 50 kg ) zak 60,000
semen isian naat / warna kg 11,700

III. BESI , BAJA & ASESORIES


wiremesh M8 (2.1 x 5.4 m) lmbr 555,000
besi beton polos rata2 kg 7,500
besi beton ulir rata2 kg 12,700
besi polos 10 mm btng 62,000
besi polos 12 mm btng 85,000
kawat beton kg 15,000
paku rata-rata kg 16,400
form tie type B bh 14,500
Besi Hollow 40 x 40 btng 30,000
Besi Hollow 20 x 40 btng 25,000

IV. KAYU & MULTIPLEKS


dolken btg 14,300
kayu balok 8x12x400 Meranti klas II campur / kayu kampung m3 1,500,000
kayu kaso 5x7x400 Meranti klas II campur / kayu kampung m3 1,400,000
kayu papan 3x20x400 Meranti campur / kayu kampung m3 1,200,000
kayu papan 3x30x400 Meranti campur / kayu kampung m3 1,200,000
triplek 122x244, 9 mm lbr 190,000

V. PINTU DAN JENDELA


Pintu :
Daun pintu double teakwood finish HPL bh 850,000
Daun pintu double triplek 6mm finish duco bh 600,000
Daun pintu alumunium spandrel bh 2,650,000
Pintu Rolling Door Besi Galvalum t 0,8 Lengkap m2 550,000
Asesories :
engsel casement 24" psg 150,000
engsel pintu 4" S/S 2BB ex.lokal psg 46,000
engsel jendela 3" S/S 2BB ex.lokal psg 46,000
lever handle pintu ex.lokal psg 185,000
kunci pintu ex.lokal set 85,000
kunci pintu keet bh 130,000
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
rambuncis ex.dekson bh 11,000
Kaca :
bevel kaca m' 16,000
kaca clear 5 mm m2 147,300
kaca cermin 5 mm m2 135,000
Alumunium / Frame :
jalusi/kisi/krepyak m' 21,000
frame pintu alumunium m' 154,000
kusen alumunium 3" CA m' 120,000
kusen alumunium 4" CA m' 134,500
sealant kusen m' 6,705
sealant kaca m' 5,500
sealant kusen/jendela tube 45,000
sekrup fischer bh 400

VI. ATAP
nok galvalum m' 35,000
atap spandek galvalum t=0.35 mm m2 45,000
Atap Spandek Zincalume m2 55,000
Screw Cteks 12-4 x 5 bh 1,500
Screw Cteks 10 x 16-16 bh 1,000
Paku biasa 2" - 5" kg 16,400
Profil C-75.08 m1 17,700
Profil C-75.06 m1 11,500
Baut (Srew driver bh 500
Dinabolt bh 1,250
Reng m1 9,500
Aluminium foil 3mm m2 8,450
Glass wool tebal 2,5 cm m2 31,500
Roofmesh Type 2215 dia 1,6mm ( 50x50 mm) m2 55,000

VII. PLAFOND
gypsum board 4x8 ft , t = 9 mm lbr 60,000
penggantung plafond bh 1,500
hollow 20 x 40 x 0.35 mm btg 30,000
hollow 40 x 40 x 0.35 mm btg 25,000
List gypsum 5 x 5 m' 18,000
panel GRC 4x8 ft , t - 4.5 mm lbr 45,000
Lisplang GRC 20 cm m' 45,000
compound zak 60,000
skrup gypsum bh 200
textile tape roll 4,000

VIII. MATERIAL LANTAI


dinding keramik 20 x 20 unpolished m2 45,000
dinding keramik 30 x 60, Asia Tile/KIA/Mulia m2 85,000
lantai keramik 30x30, Asia Tile/KIA/Mulia m2 57,000
lantai keramik 40x40, Asia Tile/KIA/Setara m2 75,000
plint keramik uk.10x40 bh 5,700
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
batu alam candi m2 180,000

IX. CAT
cat dasar alkali Catylac kg 65,400
amplas lbr 6,700
cat besi Glotex kg 55,000
meni kayu kg 17,500
meni besi kg 27,500
cat tembok dalam Catylac kg 75,500
cat tembok mowilex (interior) kg 68,000
cat tembok catylac (luar) kg 75,500
cat plafond putih vinilex kg 45,000
plamur tembok kg 48,470
thinner impala ltr 11,500
plamur kayu kg 20,000
kuas besar bh 10,900
kuas roll bh 23,900

X. SANITAIR
closet jongkok INA bh 350,000
wastafel tanam + accessories ex.lokal bh 625,000
kran air lokal bh 35,000
seal tape bh 15,000
sealant silicon tube 44,700

XI. JALAN & LANDSCAPE


buis beton ø 30 cm, panj.0.50 m m' 150,000

XII. BBM & LISTRIK


Oli / Pelumas ltr 12,000
Penyambungan Daya Listrik VA 1,200
Perijinan Sertifikat Layak Operasi (SLO) VA 350
Air kerja m3 4,000
Air kerja ltr 1,000
Listrik kerja W 2,500

XIII BAHAN KABEL


Kabel NYY 3 x 2,5 mm2 m' 8,000
Kabel NYY 4 x 10 mm2 m' 26,000
Kabel NYA 1 x 50 mm2 m' 9,000

XIV BAHAN LAMPU, SAKLAR & STOP KONTAK


Lampu TL TKO 2 x 36 watt + rumah bh 250,000
Lampu Baret bh 365,000
Downlight E27ESS 8 Watt bh 150,000
Fitting bh 15,000
Stop kontak bh 28,800
Saklar Seri/Ganda bh 34,000
Stop kontak Ganda bh 28,800
HARGA SATUAN BAHAN & ALAT
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

HARGA SATUAN
NO. JENIS BAHAN SATUAN
(Rp.)
Stop kontak AC bh 60,000
AC split wall 2 PK bh 4,000,000
Exhaust Fan KDK 40 AAS 16 inch bh 650,000
Kipas Angin Gantung Maspion 48" Besi-CF240 bh 850,000
Lampu TL TKO 2 x 36 watt + rumah bh 250,000

XV BAHAN PANEL
Box Panel Standard unt 125,000
MCB : 1 P , 6/10/16/25 A unt 65,000

XVI ASESORIES & LAIN-LAIN


Logo (tampak muka gedung) set 2,000,000
Flexible conduit 20 mm m' 5,500
Splitzen 3/4" bh 60,000
Klem Penyambung Kabel BC bh 5,000
Kamera SLR (Digital) sewa/hr 150,000
CD copy soft file foto image bh 10,000
Foto printing uk.3R lbr 1,500
Foto album bh 500
Ijuk ikat 10,000
IMB dok 1,500,000
Transportasi paket 1,000,000
Stamper jam 36,875
alat las sewa/hr 465,000
XVII BAHAN PIPA
Pipa PVC tipe AW diameter 1/2" @4m btg 25,000
Pipa PVC tipe AW diameter 3/4" @4m btg 45,000
Pipa PVC tipe AW diameter 1 1/2" @4m btg 78,000
Pipa PVC tipe AW diameter 2" @4m btg 97,000
Pipa PVC tipe AW diameter 3" @4m btg 217,500
Pipa PVC tipe AW diameter 4" @4m btg 265,000
Pipa GIP Medium diameter 1 1/2" @6m btg 175,000
HARGA SATUAN UPAH
PEKERJAAN : PEMBANGUNAN WORKSHOP BLK KOMUNITAS
PEMBERI BANTUAN : KEMENTERIAN KETENAGAKERJAAN RI
TAHUN ANGGARAN : 2020

NO. PEKERJA SATUAN HARGA UPAH

1 Tukang Galian Org / hr Rp 90,000.00


2 Tukang Batu Org / hr Rp 90,000.00
3 Tukang Las Org / hr Rp 90,000.00
4 Tukang Besi Org / hr Rp 90,000.00
5 Tukang Kaca/Alumunium/Gipsum Org / hr Rp 90,000.00
6 Tukang Kayu Org / hr Rp 90,000.00
7 Tukang Cat Org / hr Rp 90,000.00
Tukang Rolingdoor Org / hr Rp 90,000.00
8 Tukang Plumbing Org / hr Rp 90,000.00
9 Pembantu Instalator / Tukang Listrik Org / hr Rp 90,000.00
10 Pekerja / Kenek Org / hr Rp 80,000.00
11 Tukang foto Org / hr Rp 150,000.00
12 Ketua Unit Pengelola Teknis Org / hr Rp 400,000.00
13 Ketua Unit Pengelola Keuangan Org / hr Rp 400,000.00
14 Anggota Pengelola Teknis Org / hr Rp 300,000.00
15 Anggota Pengelola Keuangan Org / hr Rp 300,000.00