JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK
TAHUN ANGGARAN 2022 : 2022

Bobot Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu
No Uraian Pekerjaan
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
I. A. PEKERJAAN STRUKTUR 100%
1. PEKERJAAN PERSIAPAN 0.29 0.07 0.07 0.07 0.07

2. PEKERJAAN STRUKTUR LANTAI I 1.60 0.40 0.40 0.40 0.20 0.20

3. PEKERJAAN STRUKTUR LANTAI II 14.06 1.76 1.76 1.76 1.76 1.76 1.76 1.76 0.88 0.88

4. PEKERJAAN STRUKTUR LT. PENTHOUSE (ATAP) 6.69 1.67 1.67 1.67 0.84 0.84

5. PEKERJAAN ATAP & PELINGKUP 3.73 0.93 0.93 0.93 0.47 0.47

6. PEKERJAAN HALAMAN 8.04 2.68 2.68 1.34 1.34

II. B. PEKERJAAN ARSITEKTUR -

1. PEKERJAAN ARSITEKTUR LANTAI I 25.11 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 2.09 1.05 1.05

2. PEKERJAAN ARSITEKTUR LANTAI II 27.13 3.01 3.01 3.01 3.01 3.01 3.01 3.01 3.01 1.51 1.51

3. PEKERJAAN ARSITEKTUR LT PENTHOUSE 6.63 1.66 1.66 1.66 0.83 0.83

III. C. PEKERJAAN ELEKTRIKAL 4.50 0.90 0.90 - 0.90 0.90 0.45 0.45

IV. D. PEKERJAAN MEKANIKAL 2.22 0.56 0.56 0.56 0.28 0.28

Jumlah Bobot 100.00

Bobot Rencana 0.073 0.073 0.073 0.073 0.401 0.401 2.158 1.958 1.958 1.757 3.850 3.850 3.850 4.644 8.213 8.612 7.431 7.775 6.128 8.129 7.662 5.994 6.789 5.465 1.340 1.340

Akumulasi Bobot Rencana 0.073 0.146 0.219 0.292 0.693 1.094 3.252 5.210 7.168 8.925 12.775 16.625 20.475 25.119 33.333 41.945 49.376 57.151 63.279 71.408 79.071 85.065 91.854 97.320 98.660 100.00

Bobot Realisasi Mingguan 0.54 2.12 2.70 2.450

Akumulasi Bobot Realisasi Mingguan 0.54 2.66 5.36 7.810

Devias ( + / - ) 0.467 2.514 5.141 7.518

Jangka Waktu Pelaksanaan 180 ( Seratus Delapan Puluh ) Hari Kalender


Solok, 14 Juli 2022
Penawar,
CV. H A I K A L

(EFILLIAN RAHMI,SE )
Direktris
REKAPITULASI
PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR DINAS PERTANIAN
LOKASI : KOTA SOLOK
TAHUN ANGGARAN 2022 : 2022

NO URAIAN PEKERJAAN BOBOT JUMLAH (Rp.)

1 2 3 4

I. PEKERJAAN PERSIAPAN 0.29 Rp 11,075,000.00

II. PEKERJAAN STRUKTUR LANTAI - I 1.60 Rp 60,728,792.61

III. PEKERJAAN STRUKTUR LANTAI - II 14.06 Rp 532,665,080.87

IV PEKERJAAN STRUKTUR LY. PENTHOUSE (ATAP) 6.69 Rp 253,501,050.46

V. PEKERJAAN ATAP & PELINGKUP 3.73 Rp 141,368,413.38

VI. PEKERJAAN HALAMAN 8.04 Rp 304,645,053.33

A JUMLAH TOTAL 34.42 Rp 1,303,983,390.65


B JUMLAH Rp 1,303,983,390.65
C DIBULATKAN Rp 1,303,983,000.00
KETERANGAN

5
REKAPITULASI

PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN BOBOT JUMLAH (Rp.) KETERANGAN

1 2 3 4 5
I PEKERJAAN ARSITEKTUR
A. PEKERJAAN ARSITEKTUR LANTAI - I 25.11 Rp 951,352,981.16

1. PEEKRJAAN DINDING 3.83 Rp 145,168,682.66


2. PEKERJAAN PLAFOND & PARTISI 6.23 Rp 236,020,400.10
3. PEKERJAAN LANTAI 6.43 Rp 243,753,711.54
4. PEKERJAAN PINTU / JENDELA 6.13 Rp 232,256,163.87
5. PEKERJAAN PENGECATAN 0.60 Rp 22,715,093.96
6. PEKERJAAN TOILET DAN KM / WC 1.89 Rp 71,438,929.04

II B. PEKERJAAN ARSITEKTUR LANTAI - II 27.13 Rp 1,027,760,100.16

1. PEKERJAAN DINDING 5.95 Rp 225,318,090.19


2. PEKERJAAN PLAFOND & PARTISI 6.80 Rp 257,589,086.99
3. PEKERJAAN LANTAI 3.84 Rp 145,502,394.30
4. PEKERJAAN PINTU / JENDELA 7.21 Rp 273,028,379.98
5. PEKERJAAN PENGECATAN 1.10 Rp 41,591,250.46
6. PEKERJAAN TOILET DAN KM / WC 2.24 Rp 84,730,898.23

III PEKERJAAN ARSITEKTUR LT PENTHOUSE 6.63 Rp 251,001,977.78

A JUMLAH TOTAL Rp 2,230,115,059.10


B JUMLAH Rp 2,230,115,059.10
C DIBULATKAN Rp 2,230,115,000.00
Mutual Check (MC-0)

KEGIATAN : PENYELENGGARAAN BANGUNAN GEDUNG DI WILAYAH DAERAH KABUPATEN/KOTA , PEMBERI IZIN MENDIRIKAN BANGUNAN (IMB) DAN SERTIFIKAT LAIK FUNGSI BANGUNAN GEDUNG
PEKERJAAN : LANJUTKAN PEMBANGUNAN KANTOR DINAS PERTANIAN
LOKASI : KOTA SOLOK
TAHUN ANGGARAN : 2022
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
I. PEKERJAAN PERSIAPAN
A PEKERJAAN PENDAHULUAN
Penerapan Keamanan Kesehatan dan Keselamatan Kerja (K3)
A. SOSIALISASI DAN PROMOSI K3
a. Poster Lb 3.00 75,000.00 225,000.00 - - - - 3.00 75,000.00 225,000.00
B. ALAT PELINDUNG KERJA
a.Penahan Jatuh (SafetyBelt) Bh 7.00 500,000.00 3,500,000.00 - - - - 7.00 500,000.00 3,500,000.00
C.SOSIALISASI DAN PROMOSI K3
a.Topi Pelindung (Safety Helmet) Bh 20.00 50,000.00 1,000,000.00 - - - - 20.00 50,000.00 1,000,000.00
b.Sepatu Keselamatan (Safety Shoes) Psg 20.00 250,000.00 5,000,000.00 - - - - 20.00 250,000.00 5,000,000.00
c.Rompi keselamatan (Safety Vest) Bh 20.00 55,000.00 1,100,000.00 - - - - 20.00 55,000.00 1,100,000.00
D.FASILITAS SARANA KESEHATAN
a.Peralatan P3K Ls 1.00 250,000.00 250,000.00 - - - - 1.00 250,000.00 250,000.00
SUB TOTAL I A 11,075,000.00 - - 11,075,000.00

II PEKERJAAN STRUKTUR LANTAI -I


A PEKERJAAN BETON KONVEKSIONAL

B PEKERJAAN BETON PRAKTIS K -225 U - 24

2. Pet. Beton TB 10 cm
a Beton K-225 M³ 0.62 1,054,470.90 653,771.96 0.53 560,978.52 - - 1.152 1,054,470.90 1,214,750.48
b Begisting / Cetakan M² 6.24 137,860.80 860,251.39 10.24 1,412,246.04 - - 16.484 137,860.80 2,272,497.43
c Pembesian Kg 84.63 17,244.99 1,459,443.50 138.85 2,394,396.67 - - 223.476 17,244.99 3,853,840.18

3 Kolom 15/23 (KP.1.1)


a Beton K-225 M³ 1,054,470.90 0.48 509,309.44 - - 0.48 1,054,470.90 509,309.44
b Begisting / Cetakan M² 137,860.80 12.60 1,737,046.08 - - 12.60 137,860.80 1,737,046.08
c Pembesian Kg 17,244.99 104.45 1,801,213.91 - - 104.45 17,244.99 1,801,213.91

4 Kolom 20/20 (Pintu Utama) - (KP.1.2)


a Beton K-225 M³ 1,054,470.90 0.56 590,503.70 - - 0.56 1,054,470.90 590,503.70
b Begisting / Cetakan M² 137,860.80 11.32 1,560,584.26 - - 11.32 137,860.80 1,560,584.26
c Pembesian Kg 17,244.99 109.00 1,879,738.40 - - 109.00 17,244.99 1,879,738.40

5 Kolom 15/50 (KP.1.3)


a Beton K-225 M³ 1,054,470.90 0.53 553,597.22 - - 0.53 1,054,470.90 553,597.22
b Begisting / Cetakan M² 137,860.80 10.08 1,389,636.86 - - 10.08 137,860.80 1,389,636.86
c Pembesian Kg 17,244.99 85.53 1,474,989.90 - - 85.53 17,244.99 1,474,989.90

6. Kolom 10/15 (KP.1.4) -+3.60


a Beton K-225 M³ 1,054,470.90 1.52 1,605,431.95 - - 1.52 1,054,470.90 1,605,431.95
b Begisting / Cetakan M² 137,860.80 54.81 7,556,150.45 - - 54.81 137,860.80 7,556,150.45
c Pembesian Kg 17,244.99 423.82 7,308,783.62 - - 423.82 17,244.99 7,308,783.62
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
7. Kolom 10/15 (Toilet) - (KP.1.5) +2.8
a Beton K-225 M³ 1,054,470.90 1.09 1,151,482.22 - - 1.09 1,054,470.90 1,151,482.22
b Begisting / Cetakan M² 137,860.80 42.22 5,821,034.42 - - 42.22 137,860.80 5,821,034.42
c Pembesian Kg 17,244.99 338.78 5,842,221.84 - - 338.78 17,244.99 5,842,221.84

8. Balok 10/15 (BP.1.6)


a Beton K-225 M³ 1,054,470.90 0.08 85,412.14 - - 0.08 1,054,470.90 85,412.14
b Begisting / Cetakan M² 137,860.80 2.92 402,002.09 - - 2.92 137,860.80 402,002.09
c Pembesian Kg 17,244.99 22.93 395,395.89 - - 22.93 17,244.99 395,395.89

9. Pondasi Plat Setempat 60/60


a Beton K-225 M³ 1,054,470.90 0.27 284,707.14 - - 0.27 1,054,470.90 284,707.14
b Begisting / Cetakan M² 210,465.15 1.80 378,837.27 - - 1.80 210,465.15 378,837.27
c Pembesian Kg 17,244.99 117.07 2,018,938.58 - - 117.07 17,244.99 2,018,938.58

9. Kolom 30/30
a Beton K-225 M³ 1,054,470.90 1.23 1,295,417.50 - - 1.23 1,054,470.90 1,295,417.50
b Begisting / Cetakan M² 202,065.15 16.38 3,309,827.16 - - 16.38 202,065.15 3,309,827.16
c Pembesian Kg 17,244.99 257.20 4,435,442.47 - - 257.20 17,244.99 4,435,442.47

SUB TOTAL II A-B 114,733,865.32 46,032,155.63 111,760,398.46 60,728,792.61

III PEKERJAAN STRUKTUR LANTAI II


A PEKERJAAN BETON KONVEKSIONAL
1. Pek. Balok B-22 25x35, K -250, U - 39
a Beton K-250 (Ready Mix) M³ 6.30 1,323,244.65 8,336,441.30 0.79 1,042,055.16 - - 7.09 1,323,244.65 9,378,496.46
b Begisting / Cetakan M² 68.40 205,530.15 14,058,262.26 19.89 4,087,994.68 - - 88.29 205,530.15 18,146,256.94
c Pembesian Kg 1166.52 17,244.99 20,116,625.73 456.94 7,879,914.69 - - 1,623.46 17,244.99 27,996,540.43

2. Pek. Balok B-1.2 25x40, K-250, U-39


a Beton K-250 (Ready Mix) M³ 0.36 1,323,244.65 476,368.07 0.38 498,201.61 - - 0.74 1,323,244.65 974,569.68
b Begisting / Cetakan M² 3.78 205,530.15 776,903.97 4.91 1,008,947.51 - - 8.69 205,530.15 1,785,851.47
c Pembesian Kg 72.17 17,244.99 1,244,570.93 73.43 1,266,230.41 - - 145.60 17,244.99 2,510,801.33

3. Pek. Balok B-2.1 & B-2.3 30x40, K-250, U-39


a Beton K-250 (Ready Mix) M³ 15.59 1,323,244.65 20,629,384.09 - - 4.05 5,353,847.85 11.54 1,323,244.65 15,275,536.24
b Begisting / Cetakan M² 142.89 205,530.15 29,368,943.04 - - 36.17 7,434,148.84 106.72 205,530.15 21,934,794.20
c Pembesian Kg 2237.18 17,244.99 38,580,146.73 - - 443.32 7,644,998.94 1,793.86 17,244.99 30,935,147.79

4. Pek. Balok B-2.4 30x40, K-250, U-39


a Beton K-250 (Ready Mix) M³ 6.91 1,323,244.65 9,143,620.53 - - 2.74 3,631,565.55 4.17 1,323,244.65 5,512,054.98
b Begisting / Cetakan M² 63.36 205,530.15 13,022,390.30 - - 17.67 3,631,717.75 45.69 205,530.15 9,390,672.55
c Pembesian Kg 1292.00 17,244.99 22,280,527.08 - - 178.64 3,080,641.28 1,113.36 17,244.99 19,199,885.80

5. Pek. Balok B-2.5 25x35, K-250, U-39


a Beton K-250 (Ready Mix) M³ 1,323,244.65 3.87 5,120,625.98 - - 3.87 1,323,244.65 5,120,625.98
b Begisting / Cetakan M² 205,530.15 58.89 12,103,876.06 - - 58.89 205,530.15 12,103,876.06
c Pembesian Kg 17,244.99 1,296.76 22,362,650.94 - - 1,296.76 17,244.99 22,362,650.94

7. Pek. Plat Lantai Tb 12, K-250, U-39


a Beton K-250 (Ready Mix) M³ 38.36 1,323,244.65 50,759,664.77 - - - - 38.36 1,323,244.65 50,759,664.77
b Begisting / Cetakan M² 319.68 210,465.15 67,281,499.15 - - - - 319.68 210,465.15 67,281,499.15
c Pembesian Kg 4335.82 17,244.99 74,771,172.54 - - - - 4,335.82 17,244.99 74,771,172.54

8. Pek. Plat Tangga + Bordes


a Beton K-250 (Ready Mix) M³ 4.80 1,323,244.65 6,351,574.32 - - - - 4.80 1,323,244.65 6,351,574.32
b Begisting / Cetakan M² 96.00 191,827.65 18,415,454.40 - - - - 96.00 191,827.65 18,415,454.40
c Pembesian Kg 1056.00 17,244.99 18,210,709.44 - - - - 1,056.00 17,244.99 18,210,709.44
-
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
B PEKERJAAN BETON PRAKTIS K-225 U-24

2. Kolom Praktis 10/15 (KP.2.1)


a Beton K-225 M³ 1,054,470.90 2.63 2,767,986.11 - - 2.63 1,054,470.90 2,767,986.11
b Begisting / Cetakan M² 137,860.80 87.50 12,062,820.00 - - 87.50 137,860.80 12,062,820.00
c Pembesian Kg 17,244.99 710.60 12,254,243.91 - - 710.60 17,244.99 12,254,243.91

3. Kolom Praktis 10/15 (KP.2.2)


a Beton K-225 M³ 1,054,470.90 0.97 1,018,618.89 - - 0.97 1,054,470.90 1,018,618.89
b Begisting / Cetakan M² 137,860.80 32.20 4,439,117.76 - - 32.20 137,860.80 4,439,117.76
c Pembesian Kg 17,244.99 272.55 4,700,069.14 - - 272.55 17,244.99 4,700,069.14

4. Balok Praktis 15/20 M³ 1.62


a Beton K-225 M³ 1.62 1,054,470.90 1,708,242.86 - - 1.62 1,708,242.86 - 1,054,470.90 -
b Begisting / Cetakan M² 21.59 137,860.80 2,976,414.67 - - 21.59 2,976,414.67 - 137,860.80 -
c Pembesian Kg 395.28 17,244.99 6,816,599.65 - - 395.28 6,816,599.65 - 17,244.99 -

5. Kolom 15/20
a Beton K-225 M³ 1,054,470.90 0.42 442,877.78 - - 0.42 1,054,470.90 442,877.78
b Begisting / Cetakan M² 137,860.80 5.60 772,020.48 - - 5.60 137,860.80 772,020.48
c Pembesian Kg 17,244.99 106.34 1,833,769.39 - - 106.34 17,244.99 1,833,769.39

6. Pet Beton Tb 10 cm M³ 0.62


a Beton K-225 M³ 0.62 1,054,470.90 653,771.96 4.19 4,422,556.40 - - 4.81 1,054,470.90 5,076,328.36
b Begisting / Cetakan M² 6.24 210,465.15 1,313,302.54 54.70 11,512,654.17 - - 60.94 210,465.15 12,825,956.71
c Pembesian Kg 84.63 17,244.99 1,459,443.50 604.55 10,425,455.63 - - 689.18 17,244.99 11,884,899.13

7. Balok 10/15 (BP.2.6)


a Beton K-225 M³ 1,054,470.90 0.08 85,412.14 - - 0.08 1,054,470.90 85,412.14
b Begisting / Cetakan M² 210,465.15 2.92 613,716.38 - - 2.92 210,465.15 613,716.38
c Pembesian Kg 17,244.99 22.93 395,395.89 - - 22.93 17,244.99 395,395.89

SUB TOTAL II A B 451,116,891.48 145,096,700.01 64,643,035.03 532,665,080.87

IV PEKERJAAN STRUKTUR LT. PENTHOUSE (ATAP)


PEK. STRUKTUR BAJA RINGAN
1. Pek. Kolom 30x50, K-250, U-39 M³
a Beton K-250 (Ready Mix) M³ 3.15 1,323,244.65 4,168,220.65 1.33 1,762,561.87 - - 4.48 1,323,244.65 5,930,782.52
b Begisting / Cetakan M² 33.60 202,065.15 6,789,389.04 10.32 2,085,312.35 - - 43.92 202,065.15 8,874,701.39
c Pembesian Kg 683.83 17,244.99 11,792,641.51 318.69 5,495,745.16 - - 1,002.52 17,244.99 17,288,386.67

2. Pek. Balok B-2.4 30x40, K-250, U-39 M³


a Beton K-250 (Ready Mix) M³ 4.03 1,323,244.65 5,332,675.94 - - 2.54 3,365,275.79 1.49 1,323,244.65 1,967,400.15
b Begisting / Cetakan M² 36.96 205,530.15 7,596,394.34 - - 19.97 4,104,026.04 16.99 205,530.15 3,492,368.31
c Pembesian Kg 753.66 17,244.99 12,996,859.16 - - 313.00 5,397,637.03 440.66 17,244.99 7,599,222.13

3. Pek. Balok B-3.5 25x35, K-250, U-39


a Beton K-250 (Ready Mix) M³ 1,323,244.65 0.57 753,257.02 - - 0.57 1,323,244.65 753,257.02
b Begisting / Cetakan M² 205,530.15 10.69 2,197,528.36 - - 10.69 205,530.15 2,197,528.36
c Pembesian Kg 17,244.99 292.30 5,040,676.55 - - 292.30 17,244.99 5,040,676.55

4. Pek. Plat Tb 10, K-250, U-39 M³


a Beton K-250 (Ready Mix) M³ 6.07 1,323,244.65 8,032,095.03 0.48 628,541.21 - - 6.55 1,323,244.65 8,660,636.23
b Begisting / Cetakan M² 60.68 210,465.15 12,771,025.30 - - 4.67 983,714.11 56.01 210,465.15 11,787,311.19
c Pembesian Kg 823.00 17,244.99 14,192,626.77 262.75 4,531,167.11 - - 1,085.75 17,244.99 18,723,793.88

5 Kolom Praktis 10/15 (KP.2.2)


a Beton K-225 M³ 1,054,470.90 0.32 339,029.27 - - 0.32 1,054,470.90 339,029.27
b Begisting / Cetakan M² 137,860.80 12.64 1,742,670.80 - - 12.64 137,860.80 1,742,670.80
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
c Pembesian Kg 17,244.99 178.16 3,072,347.55 - - 178.16 17,244.99 3,072,347.55
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
6. Balok Praktis 10/15
a Beton K-225 M³ 1,054,470.90 1.89 1,992,238.23 - - 1.89 1,054,470.90 1,992,238.23
b Begisting / Cetakan M² 137,860.80 56.00 7,720,204.80 - - 56.00 137,860.80 7,720,204.80
c Pembesian Kg 17,244.99 550.45 9,492,575.41 - - 550.45 17,244.99 9,492,575.41

4. Pek. Struktur Baja Ringan Bangunan Utama M² 526.00 285,054.00 149,938,404.00 - - 46.00 13,112,484.00 480.00 285,054.00 136,825,920.00
SUB TOTAL IV 233,610,331.74 46,853,855.69 26,963,136.97 253,501,050.46

V PEKERJAAN ATAP & PELINGKUP


1. Pek. Atap Bitumen Bergelombang 3 MM M² 526.00 234,573.41 123,385,614.98 - - 32.08 7,525,115.07 493.92 234,573.41 115,860,499.90
2. Pek. Nok Bitumen Monolayer M' 96.00 175,910.70 16,887,427.20 - - - - 96.00 175,910.70 16,887,427.20
3. Pek. Lisplank M' 130.00 36,470.70 4,741,191.00 10.40 379,295.28 - - 140.40 36,470.70 5,120,486.28
4. Pek. Ornamen Kisi Hollow 40x60 Tb 2 MM Unit 2.00 1,750,000.00 3,500,000.00 - - - - 2.00 1,750,000.00 3,500,000.00
SUB TOTAL V 148,514,233.18 379,295.28 7,525,115.07 141,368,413.38

VI PEKERJAAN HALAMAN
1 Pek. Pagar
a Galian Tanah Biasa M³ 36.20 81,453.75 2,948,625.75 - - - - 36.20 81,453.75 2,948,625.75
b Pasangan Batu 1:4 M³ 170.86 769,161.75 131,418,976.61 - - - - 170.86 769,161.75 131,418,976.61
c Plesteran 1:4 M² 173.76 64,425.69 11,194,607.89 - - - - 173.76 64,425.69 11,194,607.89
d Acian M² 173.76 39,361.88 6,839,519.40 - - - - 173.76 39,361.88 6,839,519.40
2 Pek. Sloof 15/20
a Beton K-175 M³ 2.17 990,641.40 2,149,691.84 - - - - 2.17 990,641.40 2,149,691.84
b Begisting / Cetakan M² 28.96 137,860.80 3,992,448.77 - - - - 28.96 137,860.80 3,992,448.77
c Pembesian Kg 482.42 17,244.99 8,319,328.08 - - - - 482.42 17,244.99 8,319,328.08
3 Pek. Kolom 20/20
a Beton K-175 M³ 0.94 990,641.40 931,202.92 - - - - 0.94 990,641.40 931,202.92
b Begisting / Cetakan M² 31.36 202,065.15 6,336,763.10 - - - - 31.36 202,065.15 6,336,763.10
c Pembesian Kg 272.87 17,244.99 4,705,640.42 - - - - 272.87 17,244.99 4,705,640.42
4 Pek. Kolom 13/20
a Beton K-175 Kg 1.88 990,641.40 1,862,405.83 - - - - 1.88 990,641.40 1,862,405.83
b Begisting / Cetakan M² 28.96 202,065.15 5,851,806.74 - - - - 28.96 202,065.15 5,851,806.74
c Pembesian Kg 482.42 17,244.99 8,319,328.08 - - - - 482.42 17,244.99 8,319,328.08
5 Pas. Dinding Bata 1:2 M² 115.84 124,300.05 14,398,917.79 - - - - 115.84 124,300.05 14,398,917.79
6 Plesteran Dinding 1:2 M² 231.68 70,028.99 16,224,317.33 - - - - 231.68 70,028.99 16,224,317.33
7. Pek. Acian M² 231.68 39,361.88 9,119,359.20 - - - - 231.68 39,361.88 9,119,359.20
8 Afwerking Beton M² 51.88 92,500.00 4,798,900.00 - - - - 51.88 92,500.00 4,798,900.00
9 Pas. Pintu Pagar Besi Hollow Finishing Cat Duco M² 14.40 389,792.32 5,613,009.39 - - - - 14.40 389,792.32 5,613,009.39
10 Pas. Pagar Besi Hollow Finishing Cat Duco M² 24.06 389,792.32 9,378,403.19 - - - - 24.06 389,792.32 9,378,403.19
11 Pengecatan Dg. Cat Air (Ex Dulux Weather Shield) M² 231.68 27,526.70 6,377,384.70 - - - - 231.68 27,526.70 6,377,384.70
12. Mobilisasi dan Demobilisasi Alat Berat Ls 20,000,000.00 1.00 20,000,000.00 - - 1.00 20,000,000.00 20,000,000.00
13. Galian Tanah dengan Alat Berat M³ 64,255.40 361.63 23,236,965.33 - - 361.63 64,255.40 23,236,965.33
15. Pemasangan Pipa suling air PVC 1 1/5 inch M1 16,000.00 39.22 627,450.98 - - 39.22 16,000.00 627,450.98
17. Cor Beton Lantai Halaman K.225 M³ - - - - - - -

SUB TOTAL VI 260,780,637.02 43,864,416.31 - 304,645,053.33

PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEKTUR LANTAI - I
PEKERJAAN DINDING
a Pas. Dinding Batu Bata 1 : 2 M² 150.12 124,300.05 18,659,923.51 - - 101.00 12,554,802.25 49.12 124,300.05 6,105,121.26
b Pas. Dinding Batu Bata 1 : 4 M² 131.86 113,483.48 14,963,931.01 60.47 6,862,572.70 - - 192.33 113,483.48 21,826,503.71
c Plesteran Dinding 1 : 2 M² 196.24 70,028.99 13,742,489.78 - - 98.01 6,863,401.64 98.23 70,028.99 6,879,088.14
d Plesteran Dinding 1 : 4 M² 258.03 64,425.69 16,623,760.79 126.63 8,158,482.83 - - 384.66 64,425.69 24,782,243.62
e Pas. Acian Dinding M² 407.89 39,361.88 16,055,315.19 75.01 2,952,376.80 - - 482.90 39,361.88 19,007,691.99
f Afwerking Bidang Beton M² 201.60 92,500.00 18,648,000.00 82.28 7,610,530.00 - - 283.88 92,500.00 26,258,530.00
g Pas. Batu Alam uk. 20x40 tb 15 M² 15.60 124,986.75 1,949,793.30 - - 6.48 809,914.14 9.12 124,986.75 1,139,879.16
h Pas. Balok Lathe / Blk Praktis
1.0 Beton K-225 M³ 3.78 1,054,470.90 3,985,900.00 - - 0.86 903,628.84 2.92 1,054,470.90 3,082,271.16
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
13.3 Begisting M² 50.39 137,860.80 6,946,805.71 17.19 2,369,275.71 - - 67.58 137,860.80 9,316,081.42
244.0 Besi Kg 922.32 17,244.99 15,905,399.18 - - 288.44 4,974,126.98 633.88 17,244.99 10,931,272.20
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
I Pas. Profil Beton 10 cm M' 96.00 165,000.00 15,840,000.00 - - - - 96.00 165,000.00 15,840,000.00
SUB TOTAL I A1 143,321,318.48 27,953,238.03 26,105,873.85 145,168,682.66

2 PEKERJAAN PLAFOND & PARTISI


A PEKERJAAN PLAFOND
1. Pas. Rangka Plafond PVC M³ 915.68 156,695.70 143,483,118.58 - - 417.11 65,359,265.08 498.57 156,695.70 78,123,853.50
2. Pas. Plafond PVC M³ 480.88 208,194.00 100,116,330.72 17.69 3,683,055.96 - - 498.57 208,194.00 103,799,386.68
3. Pas. Waterproofing Din. Toilet M² 60.00 178,862.25 10,731,735.00 1.80 322,130.91 - - 61.80 178,862.25 11,053,865.91

B PEEKRJAAN PARTISI
1. Pas. Dinding Partisi Tb 6 mm. Ex Gypsum Board M² 114.00 144,127.20 16,430,500.80 7.65 1,102,573.08 - - 121.65 144,127.20 17,533,073.88
2. Pas. Rangka Dinding Partisi Tb 6 mm M² 57.00 241,573.50 13,769,689.50 3.83 924,018.64 - - 60.83 241,573.50 14,693,708.14
3. Pas. Kusen Type BV - 2 Unit 8.00 1,352,064.00 10,816,512.00 - - - - 8.00 1,352,064.00 10,816,512.00
SUB TOTAL 2 A-B 295,347,886.60 6,031,778.59 65,359,265.08 236,020,400.10

3 PEKERJAAN LANTAI
1 Pas. Lantai Beton K-125 M³ 39.57 920,070.90 36,407,205.51 - - - - 39.57 920,070.90 36,407,205.51
2 Pas. Lantai Granite Homogeneus uk 60x60 M² 472.63 272,520.15 128,801,198.49 25.94 7,069,308.95 - - 498.57 272,520.15 135,870,507.45
3 Pas. Motif Centre Panel Uk. 1.20 x 1.20 cm Unit 4.00 1,500,000.00 6,000,000.00 - - - - 4.00 1,500,000.00 6,000,000.00
4 Pas. Lt Keramik 40x40 Kw 1 Non Polish (ENT) M² 59.88 246,110.55 14,737,099.73 85.67 21,084,906.09 - - 145.55 246,110.55 35,822,005.83
5 Pas. Plint Granit 10 x 60 cm M' 152.25 40,845.84 6,218,779.14 - - - - 152.25 40,845.84 6,218,779.14
6 Pas. Lantai Granite Homogeneus (Tangga Ent) M² 53.28 272,520.15 14,519,873.59 - - - - 53.28 272,520.15 14,519,873.59
7 Pas. Stair Noshing Granit 10 x 60 cm (Tangga Ent) M' 38.58 37,617.72 1,451,291.64 - - - - 38.58 37,617.72 1,451,291.64
8 Pek. Finish Tangga Type 1
Afwerking Bidang Beton M² 15.56 92,500.00 1,439,300.00 - - - - 15.56 92,500.00 1,439,300.00
Finish Cat Tembok (Interior) M² 15.56 25,690.77 399,748.38 - - - - 15.56 25,690.77 399,748.38
Pas. Railling Tangga Besi + Cat Duco M' 15.00 375,000.00 5,625,000.00 - - - - 15.00 375,000.00 5,625,000.00
SUB TOTAL 3 215,599,496.49 28,154,215.05 - 243,753,711.54

4 PEKERJAAN PINTU / JENDELA


TYPE ALUMINIUM

1 Pas. PD-1 / Framelles Tb 12 MM Produk Ashimas Unit 2.00 4,747,365.00 9,494,730.00 - - - - 2.00 4,747,365.00 9,494,730.00
Uk. 90 x 240 dengan 2 Daun
2 Pas. Curtain Wall Tb 10 MM Tempered Produk Asahimas M² 117.00 501,006.14 58,617,717.80 51.29 25,698,608.69 - - 168.29 501,006.14 84,316,326.48
tb 10 mm ex. Asahimas . Clear
3 Pas. Sandblast M² 58.50 175,000.00 10,237,500.00 - - - - 58.50 175,000.00 10,237,500.00

4 Pas. Curtain Wall Tb 8 MM Tempered Produk Asahimas M² 61.20 432,756.14 26,484,675.46 - - 61.20 26,484,675.46 432,756.14 -
Kaca Stopsol refletive super blue green
tb 8 mm ex. Asahimas U Chanel 0.8 mm
5 Pas. PD2 AC Unit 3.00 850,000.00 2,550,000.00 - - - - 3.00 850,000.00 2,550,000.00
6 Pek. Pas. Panel ACP Tb 4 mm Ekterior ex SEVEN M² 300.00 883,575.00 265,072,500.00 - - 237.90 210,202,492.50 62.10 883,575.00 54,870,007.50

1 Pas. Kusen Teralis Besi + Finish Cat M² 25.92 389,792.32 10,103,416.90 - - - - 25.92 389,792.32 10,103,416.90
2 Pas. Kusen / Pintu Type PA. 02 Unit 3.00 2,484,998.25 7,454,994.75 - - - - 3.00 2,484,998.25 7,454,994.75
4 Pas. Kusen / Pintu Type PA, 03 (Toilet) Unit 6.00 1,382,456.25 8,294,737.50 - - - - 6.00 1,382,456.25 8,294,737.50
5 Pas. Kusen / Jendela Type PJ-1 AC Unit 5.00 4,208,197.46 21,040,987.28 - - - - 5.00 4,208,197.46 21,040,987.28
6 Pas. Kusen / Jendela Type PJ -2 AC Unit 1.00 4,575,697.46 4,575,697.46 - - - - 1.00 4,575,697.46 4,575,697.46
8 Pas. Kusen / Jendela Type JA - 2 AC Unit 3.00 3,103,170.00 9,309,510.00 - - - - 3.00 3,103,170.00 9,309,510.00
9 Pas. kusen / Pintu Type PB.1 (P. Besi Plat + P. Teralis ) Unit 2.00 1,675,000.00 3,350,000.00 - - - - 2.00 1,675,000.00 3,350,000.00
10. Pas. Kusen Type BV -1 Unit 2.00 676,032.00 1,352,064.00 - - - - 2.00 676,032.00 1,352,064.00
11. Pas. Kusen Type BV - 2 Unit 3.00 1,352,064.00 4,056,192.00 - - - - 3.00 1,352,064.00 4,056,192.00
12. Pas. Pintu Shaft / P.4 Unit 1.00 1,250,000.00 1,250,000.00 - - - - 1.00 1,250,000.00 1,250,000.00
SUB TOTAL 4 443,244,723.14 25,698,608.69 236,687,167.96 232,256,163.87
5 PEKERJAAN PENGECATAN
1 Mencat Dinding Ext Cat Dulux Wheatershield M² 460.02 27,526.70 12,662,830.23 - - 243.73 6,708,998.79 216.29 27,526.70 5,953,831.44
2 Mencat Dinding Interior M² 690.03 25,690.77 17,727,402.02 - - 43.06 1,106,141.79 646.97 25,690.77 16,621,260.23
3 Mencat Bid Kayu kelihatan 3 x Lapis M² 2.31 60,607.05 140,002.29 - - - - 2.31 60,607.05 140,002.29
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
SUB TOTAL II 5 30,530,234.54 - 7,815,140.59 22,715,093.96
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
6 PEKERJAAN TOILET DAN KM/WC
1 Pas. Keramik Dinding 20 x 40 Kw I M² 28.08 238,410.38 6,694,563.33 96.66 23,044,746.85 - - 124.74 238,410.38 29,739,310.18
2 Pas. Lt Keramik 40 x 40 Kw 1 Non Polish M² 12.82 246,110.55 3,155,137.25 22.82 5,616,242.75 - - 35.64 246,110.55 8,771,380.00
3 Pas. Listello Uk. 10 x 40 M² 36.00 31,098.69 1,119,552.84 26.37 820,072.46 - - 62.37 31,098.69 1,939,625.30
4 Pas. Water Proofing Lantai & Dinding Toilet M² 28.42 178,862.25 5,083,265.15 96.32 17,228,011.92 - - 124.74 178,862.25 22,311,277.07

PEKERJAAN SANITARY FIXTURES


1. Closet Duduk ex. TOTO CW 421 J Unit 1.00 1,144,248.00 1,144,248.00 - - - - 1.00 1,144,248.00 1,144,248.00
2. Closet Jongkok ex. TOTO CE 9 Unit 4.00 616,140.00 2,464,560.00 - - - - 4.00 616,140.00 2,464,560.00
3. Jet Washer ex. TOTO Unit 4.00 134,604.75 538,419.00 - - - - 4.00 134,604.75 538,419.00
4. Kran Air 3/4" ex TOTO T 23 B13 Unit 4.00 103,409.25 413,637.00 - - - - 4.00 103,409.25 413,637.00
5. Urinoir Type ex TOTO U 57 Unit 1.00 812,122.50 812,122.50 - - - - 1.00 812,122.50 812,122.50
6. Floor Drain ex TOTO Unit 8.00 66,354.75 530,838.00 - - - - 8.00 66,354.75 530,838.00
7. Tower Ring TS 115 SB Unit 4.00 359,814.00 1,439,256.00 - - - - 4.00 359,814.00 1,439,256.00
8. Raper Holder TS 116 R Unit 4.00 333,564.00 1,334,256.00 - - - - 4.00 333,564.00 1,334,256.00
SUB TOTAL II 6 24,729,855.07 46,709,073.97 - 71,438,929.04

II PEKERJAAN ARSITEKTUR LANTAI II


1 PEKERJAAN DINDING
a Pas. Dinding Batu Bata 1 : 2 M² 166.70 124,300.05 20,720,818.34 - - 48.44 6,021,591.62 118.26 124,300.05 14,699,226.71
b Pas. Dinding Batu Bata 1 : 4 M² 400.28 113,483.48 45,425,165.37 - - 1.17 132,321.73 399.11 113,483.48 45,292,843.64
c Plesteran Dinding 1 : 2 M² 333.40 70,028.99 23,347,666.60 - - 96.89 6,784,969.17 236.51 70,028.99 16,562,697.43
d Plesteran Dinding 1 : 4 M² 800.56 64,425.69 51,576,630.39 - - 2.33 150,240.71 798.23 64,425.69 51,426,389.68
e Pas. Acian Dinding M² 963.86 39,361.88 37,939,336.84 233.48 9,190,289.30 - - 1,197.34 39,361.88 47,129,626.14
f Afwerking Bidang Beton M² 201.60 92,500.00 18,648,000.00 82.28 7,610,530.00 - - 283.88 92,500.00 26,258,530.00
g Pas. Batu Alam uk. 20x40 tb 15 M² 15.60 124,986.75 1,949,793.30 - - 5.28 659,930.04 10.32 124,986.75 1,289,863.26
h Pas. Balok Lathe / Blk Praktis
1.0 Beton K-225 M³ 1.51 1,054,470.90 1,592,251.06 - - - - 1.51 1,054,470.90 1,592,251.06
13.3 Begisting M² 20.13 137,860.80 2,775,137.90 86.59 11,937,780.25 - - 106.72 137,860.80 14,712,918.16
244.0 Besi Kg 368.44 17,244.99 6,353,744.12 - - - - 368.44 17,244.99 6,353,744.12
SUB TOTAL 1 210,328,543.91 28,738,599.55 13,749,053.27 225,318,090.19

2 PEKERJAAN PLAFOND & PARTISI


A PEKERJAAN PLAFOND
1. Pas. Rangka Plafond PVC M² 447.62 156,695.70 70,140,129.23 54.92 8,605,414.45 - - 502.54 156,695.70 78,745,543.69
2. Pas. Plafond PVC M² 447.62 208,194.00 93,191,798.28 54.92 11,433,598.09 - - 502.54 208,194.00 104,625,396.37

B PEEKRJAAN PARTISI
1. Pas. Dinding Partisi Tb 6 mm. Ex Gypsum Board M² 142.50 144,127.20 20,538,126.00 50.04 7,212,125.09 - - 192.54 144,127.20 27,750,251.09
2. Pas. Rangka Dinding Partisi Tb 6 mm M² 71.25 241,573.50 17,212,111.88 25.02 6,044,168.97 - - 96.27 241,573.50 23,256,280.85
3. Pas. Kusen Type BV - 2 Unit 8.00 1,352,064.00 10,816,512.00 - - - - 8.00 1,352,064.00 10,816,512.00
4. Pas. Partisi Type PT.07. AC Unit 1.00 12,395,103.00 12,395,103.00 - - - - 1.00 12,395,103.00 12,395,103.00
SUB TOTAL II A-B 224,293,780.39 33,295,306.60 - 257,589,086.99

3 PEKERJAAN LANTAI
1.Pas. Lantai Granite Homogeneus uk.60x60 M² 531.25 272,520.15 144,776,329.69 - - 8.34 2,273,935.38 522.91 272,520.15 142,502,394.30
2.Pas. Motif Centre Panel Uk. 1.20x1.20 cm Unit 2.00 1,500,000.00 3,000,000.00 - - - - 2.00 1,500,000.00 3,000,000.00
SUB TOTAL II-3 147,776,329.69 - 2,273,935.38 145,502,394.30

4 PEKERJAAN PINTU / JENDELA


TYPE ALLUMUNIUM
1. Pek. Pas. Panel ACP Tb 4 mm Ekterior ex. SEVEN M² 300.00 883,575.00 265,072,500.00 - - 189.46 167,405,653.80 110.54 883,575.00 97,666,846.20
2. Pas. Curtain Wall TB 8 MM Tempered Produk Asahimas M² 126.00 432,756.14 54,527,273.01 70.68 30,586,770.87 - - 196.68 432,756.14 85,114,043.88
Kaca Stopsol reflective super silver blue green
tb 8 mm ex. Asahimas U Chanel 0.8 mm
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
4. Pas. Kusen / Jendela Type PJ-1 AC Unit 5.00 4,208,197.46 21,040,987.28 - - - - 5.00 4,208,197.46 21,040,987.28
5. Pas. Kusen / Jendela Type PJ-2 AC Unit 6.00 4,575,697.46 27,454,184.73 - - - - 6.00 4,575,697.46 27,454,184.73
6. Pas. Kusen / Jendela Type PD- 2 AC Unit 2.00 4,517,925.83 9,035,851.65 - - - - 2.00 4,517,925.83 9,035,851.65
7. Pas. Kusen / Jendela Type JA - 2 AC Unit 3.00 3,103,170.00 9,309,510.00 - - - - 3.00 3,103,170.00 9,309,510.00
8. Pas. Kusen Type PA-2 Unit 3.00 2,484,998.25 7,454,994.75 - - - - 3.00 2,484,998.25 7,454,994.75
9. Pas. Kusen Type BV-1 Unit 3.00 676,032.00 2,028,096.00 - - - - 3.00 676,032.00 2,028,096.00
10. Pas. Kusen Type BV-2 Unit 2.00 1,352,064.00 2,704,128.00 - - - - 2.00 1,352,064.00 2,704,128.00
11.Pas. Kusen / Pintu Type PA.3 (Toilet) Unit 6.00 1,382,456.25 8,294,737.50 - - - - 6.00 1,382,456.25 8,294,737.50
12. Pas. Pintu Shaft / P.4 Unit 1.00 1,250,000.00 1,250,000.00 - - - - 1.00 1,250,000.00 1,250,000.00
13. Pas. Kusen / Pintu Type PB.1 (P.Besi Plat + P.Teralis) Unit 1.00 1,675,000.00 1,675,000.00 - - - - 1.00 1,675,000.00 1,675,000.00
SUB TOTAL II-4 409,847,262.92 30,586,770.87 167,405,653.80 273,028,379.98

5 PEKERJAAN PENGECATAN

1. Mencat Dinding Ext. Cat Dulux Wheatershield M² 346.98 27,526.70 9,551,212.63 226.29 6,228,905.70 - - 573.27 27,526.70 15,780,118.34
2. Mencat Dinding Interior M² 520.48 25,690.77 13,371,531.97 473.31 12,159,595.59 - - 993.79 25,690.77 25,531,127.56
4. Mencat Bid Kayu 3 x Lapis M² 4.62 60,607.05 280,004.57 - - - - 4.62 60,607.05 280,004.57
SUB TOTAL II-5 23,202,749.17 18,388,501.29 - 41,591,250.46

6 PEKERJAAN TOILET DAN KM/WC


1. Pas. Keramik Dinding 20 x 40 Kw I M² 14.40 238,410.38 3,433,109.40 110.34 26,306,200.78 - - 124.74 238,410.38 29,739,310.18
2. Pas. Lt. Keramik 40 x 40 Kw I Non Polish M² 51.84 246,110.55 12,758,370.91 - - 16.20 3,986,990.91 35.64 246,110.55 8,771,380.00
3. Pas. Water Proofing Lantai & Dinding Toilet M² 80.64 178,862.25 14,423,451.84 44.10 7,887,825.23 - - 124.74 178,862.25 22,311,277.07
4 Pas. Listello Uk. 10 x 40 M1 31,098.69 62.37 1,939,625.30 - - 62.37 31,098.69 1,939,625.30

PEKERJAAN SANITARY FIXTURES


1. Closet Jongkok ex. TOTO CE 9 Unit 6.00 1,144,248.00 6,865,488.00 - - - - 6.00 1,144,248.00 6,865,488.00
2. Closet Duduk ex. TOTO CW 421 J Unit 1.00 616,140.00 616,140.00 - - - - 1.00 616,140.00 616,140.00
3. Jet Washer ex. TOTO Unit 6.00 134,604.75 807,628.50 - - - - 6.00 134,604.75 807,628.50
4. Kran Air 3/4" ex TOTO T 23 B13 Unit 12.00 103,409.25 1,240,911.00 - - - - 12.00 103,409.25 1,240,911.00
5. Floor Drain ex TOTO Unit 8.00 66,354.75 530,838.00 - - - - 8.00 66,354.75 530,838.00
6. Tower Ring TS 115 SB Unit 6.00 359,814.00 2,158,884.00 - - - - 6.00 359,814.00 2,158,884.00
7. Raper Holder TS 116 R Unit 6.00 333,564.00 2,001,384.00 - - - - 6.00 333,564.00 2,001,384.00
8. Pek. Meja Wastafel tb 10 cm Unit 3.00 2,582,677.40 7,748,032.19 - - - - 3.00 2,582,677.40 7,748,032.19

SUB TOTAL II-6 52,584,237.85 36,133,651.30 3,986,990.91 84,730,898.23

III PEKERJAAN ARSITEKTUR LT PENTHOUSE


A. PEKERJAAN DINDING & LANTAI
1. Pas. Dinding Batu Bata 1:2 M² 57.60 124,300.05 7,159,682.88 148.27 18,430,465.61 - - 205.87 124,300.05 25,590,148.49
2. Plesteran Dinding 1:2 M² 115.20 70,028.99 8,067,340.11 296.55 20,766,958.11 - - 411.75 70,028.99 28,834,298.22
3. Pas. Acian Dinding M² 109.44 39,361.88 4,307,763.60 302.31 11,899,409.71 - - 411.75 39,361.88 16,207,173.31
4. Pas. Dinding GRC tb 4 mm M² 50.00 127,500.00 6,375,000.00 - - 50.00 6,375,000.00 127,500.00 -
5. Pas. Rangka Plafond PVC M² 156,695.70 199.83 31,312,345.04 - - 199.83 156,695.70 31,312,345.04
6. Pas. Plafond PVC M² 208,194.00 199.83 41,603,198.83 - - 199.83 208,194.00 41,603,198.83
7. Pas. Lap. Waterproofing Plat Dack M² 201.60 178,862.25 36,058,629.60 9.44 1,687,565.33 - - 211.04 178,862.25 37,746,194.93
8. Pintu Besi M² 4.50 675,408.30 3,039,337.35 - - - - 4.50 675,408.30 3,039,337.35

B. PEKERJAAN PENGECATAN
1. Mencat Dinding Ext Cat Dulux Wheatershield M² 274.64 27,526.70 7,559,931.51 137.11 3,774,130.10 - - 411.75 27,526.70 11,334,061.61

C. PEKERJAAN LAIN -LAINYA


1. Pek. Pas. Panel ACP Tb.4 mm Ekterior ex SEVEN M² 21.60 883,575.00 19,085,220.00 - - - - 21.60 883,575.00 19,085,220.00
2. Logo Dinas Pertanian Uk. 1 M Unit 1.00 2,500,000.00 2,500,000.00 - - - - 1.00 2,500,000.00 2,500,000.00
3. Logo PEMDA Kota Solok Uk. 1 M Unit 1.00 2,500,000.00 2,500,000.00 - - - - 1.00 2,500,000.00 2,500,000.00
4. Tulisan "Dinas Pertanian" Letter H: 35 cm Unit 14.00 1,250,000.00 17,500,000.00 - - - - 14.00 1,250,000.00 17,500,000.00
Bahan Steinless Stell
5. Tulisan "Kota Solok" Letter H:50 cm Unit 10.00 1,375,000.00 13,750,000.00 - - - - 10.00 1,375,000.00 13,750,000.00
Bahan Steinless Stell
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)

SUB TOTAL III A-B-C 127,902,905.05 129,474,072.72 6,375,000.00 251,001,977.78


SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)

C PEKERJAAN ELEKTRIKAL DAN MEKANIKAL

I PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Listrik Gedung
a. Penerangan Lantai 1
1 Pas. Instalasi Titik Lampu Ttk 129.00 207,300.00 26,741,700.00 - - - - 129.00 207,300.00 26,741,700.00
2 Pas. Instalasi Stop Kontak Ttk 39.00 223,100.00 8,700,900.00 - - - - 39.00 223,100.00 8,700,900.00
3 Pas. Instalasi Stop Kontak AC Ttk 10.00 239,900.00 2,399,000.00 - - - - 10.00 239,900.00 2,399,000.00
4 Pas. Lampu TBS 318 2 x 16 W LED RM Prismatic M2 Phillips Bh 41.00 195,000.00 7,995,000.00 - - - - 41.00 195,000.00 7,995,000.00
5 Pas. Lampu Downlights Nickel E27 + LED 13W 6500 K 5" 220V ex. Phillips Bh 67.00 105,000.00 7,035,000.00 - - - - 67.00 105,000.00 7,035,000.00
6 Pas. Lampu Downligths Slimit 59724 LED 13 W 6500K 5" 220V ex. Phillips Bh 12.00 95,000.00 1,140,000.00 - - - - 12.00 95,000.00 1,140,000.00
7 Pas. Lampu Downligths Esscus Led Spot 7W 4000K 220V ex Phillips Bh 5.00 115,000.00 575,000.00 - - - - 5.00 115,000.00 575,000.00
8 Pas. Lampu Ceiling WHT 331815 LED 17 W ex. Phillips Bh 1.00 150,000.00 150,000.00 - - - - 1.00 150,000.00 150,000.00
9 Lampu Exit 10W PHILIPS (termasuk Emergency c/w Battery Nicad 20W) ex Ph Bh 3.00 85,000.00 255,000.00 - - - - 3.00 85,000.00 255,000.00
10 Pas. Sakelar Tunggal 10A 1 Phasa type hotel vivace by Schneider Bh 3.00 68,000.00 204,000.00 - - - - 3.00 68,000.00 204,000.00
11 Pas. Sakelar Ganda 10A, 1 Phasa type hotel Vivace by schneider Bh 13.00 73,000.00 949,000.00 - - - - 13.00 73,000.00 949,000.00
12 Pas. Stop Kontak 16A, Phasa Vivace by Schneider Bh 39.00 84,000.00 3,276,000.00 - - - - 39.00 84,000.00 3,276,000.00
13 Pas. Stop Kontak AC 16A, 1 Phasa Vivace by Schneider Bh 10.00 78,000.00 780,000.00 - - - - 10.00 78,000.00 780,000.00
14 Pas. Stop Kontak Lantai 10 a, 1 Phasa Bh 2.00 68,000.00 136,000.00 - - - - 2.00 68,000.00 136,000.00
15 Pas. Gridswitch 6 Gang Bh 1.00 60,000.00 60,000.00 - - - - 1.00 60,000.00 60,000.00
Penerangan Lantai 1 60,396,600.00 - - 60,396,600.00

b. Penerangan Lantai 2
1 Pas. Instalasi Titik Lampu Ttk 123.00 207,300.00 25,497,900.00 - - - - 123.00 207,300.00 25,497,900.00
2 Pas. Instalasi Stop Kontak Ttk 52.00 223,100.00 11,601,200.00 - - - - 52.00 223,100.00 11,601,200.00
3 Pas. Instalasi Stop Kontak Ttk 7.00 239,900.00 1,679,300.00 - - - - 7.00 239,900.00 1,679,300.00
4 Pas. Lampu TBS 318 2 x 16W LED RM Prismatic M2 Philips Bh 54.00 195,000.00 10,530,000.00 - - - - 54.00 195,000.00 10,530,000.00
5 Pas. Lampu Downligths Nickel E27 + LED 13 W 6500 K 5"220V ex Phillips Bh 49.00 105,000.00 5,145,000.00 - - - - 49.00 105,000.00 5,145,000.00
6 Pas. Lampu Downligths Slimlif 59724 LED 13W 6500K 5" 220V ex. Philips Bh 15.00 95,000.00 1,425,000.00 - - - - 15.00 95,000.00 1,425,000.00
7 Pas. Lampu Downligths Esscus Led spot 7 W4000K 220V ex. Phillips Bh 4.00 115,000.00 460,000.00 - - - - 4.00 115,000.00 460,000.00
8 Lampu Exit 10 W PHILIPS (termasuk Emergency c/w Battery Nicad 20W) ex. Philips Bh 1.00 150,000.00 150,000.00 - - - - 1.00 150,000.00 150,000.00
9 Pas. Sakelar Tunggal 10A, 1 Phasa type hotel Vivace by schneider Bh 3.00 85,000.00 255,000.00 - - - - 3.00 85,000.00 255,000.00
10 Pas. Sakelar Ganda 10A 1Phasa type hotel Vivace By schneider Bh 11.00 68,000.00 748,000.00 - - - - 11.00 68,000.00 748,000.00
11 Pas. Stop Kontak 16A, 1 Phasa Vivace by Schneider Bh 40.00 73,000.00 2,920,000.00 - - - - 40.00 73,000.00 2,920,000.00
12 Pas. Stop Kontak AC 16A, 1 Phasa Vivace by schneider Bh 7.00 84,000.00 588,000.00 - - - - 7.00 84,000.00 588,000.00
13 Pas. Stop Kontak Lantai 10A, 1 Phasa Bh 12.00 78,000.00 936,000.00 - - - - 12.00 78,000.00 936,000.00
14 Pas. Gridswitch 6 Gang Bh 1.00 68,000.00 68,000.00 - - - - 1.00 68,000.00 68,000.00
Penerangan Lantai 2 62,003,400.00 - - 62,003,400.00

Sub total Pekerjaan Instalasi Listrik Gedung

B. Pek. CCTV
a. Peralatan Utama CCTV
1 Recorder 32 ch 1 x 2 TB 16 Poe DDN - 3532-212 N16 Unit 2.00 1,837,000.00 3,674,000.00 - - - - 2.00 1,837,000.00 3,674,000.00
2 HDD 2 TB WD PURPLE Unit 2.00 498,000.00 996,000.00 - - - - 2.00 498,000.00 996,000.00
3 UPS For Backup Power 2 KVA ICA Unit 1.00 997,000.00 997,000.00 - - - - 1.00 997,000.00 997,000.00
4 Wall Mount Bracket NEZ-A4-WW Bh 1.00 367,000.00 367,000.00 - - - - 1.00 367,000.00 367,000.00
5 Pas. TV LED Monitor 32" Color + Bricket Unit 1.00 2,310,000.00 2,310,000.00 - - - - 1.00 2,310,000.00 2,310,000.00
Sub Total Peralatan Utama CCTV 8,344,000.00 - - 8,344,000.00

b.Instalasi CCTV Lantai 1


1 Pas. Instalasi CCTV CAT 6e Ttk 4.00 207,300.00 829,200.00 - - - - 4.00 207,300.00 829,200.00
2 Indoor Dome Camera NUC-21012-F2 Unit 4.00 682,000.00 2,728,000.00 - - - - 4.00 682,000.00 2,728,000.00
3 PSU For Camera 12 V 10 V Unit 4.00 929,000.00 3,716,000.00 - - - - 4.00 929,000.00 3,716,000.00

Sub Total Instalasi CCTV Lantai 1 7,273,200.00 - - 7,273,200.00


SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)

b.Instalasi CCTV Lantai 2


1 Pas. Instalasi CCTV CAT 6e Ttk 1.00 207,300.00 207,300.00 - - - - 1.00 207,300.00 207,300.00
2 Indoor Dome Camera NUC-21012-F2 Unit 1.00 682,000.00 682,000.00 - - - - 1.00 682,000.00 682,000.00
3 PSU For Camera 12 V 10 V Unit 1.00 929,000.00 929,000.00 - - - - 1.00 929,000.00 929,000.00
Sub Total Instalasi CCTV Lantai 2 1,818,300.00 - - 1,818,300.00

Sub Total Pekerjaan CCTV 17,435,500.00 - - 17,435,500.00

C. Pek. Perlengkapan Utama / Equement


a. Kabel Feeder
1 Pas. Kbl dr Meteran PLN ke MDP Gedung NYY 4x50 mm NYY 1 x35 mm M' 20.00 35,000.00 700,000.00 - - - - 20.00 35,000.00 700,000.00
2 Pas. Kbl dr MDP ke SDP. Pompa booster rooftank NYY 4x4 mm M' 16.00 25,000.00 400,000.00 - - - - 16.00 25,000.00 400,000.00
3 Pas. Kbl dr MDP ke SDP. Pompa Panel Pompa Sumur Bor NYY 4x6 mm M' 20.00 20,000.00 400,000.00 - - - - 20.00 20,000.00 400,000.00

Sub Total Pekerjaan Perlengkapan Utama/Equement 1,500,000.00 - - 1,500,000.00

a. Kabel Power Lantai 1


1 Pas. Kbl dr MDP Gedung ke SDP.1 NYY 4x10 mm NYY 1 x 16 mm M' 6.00 30,000.00 180,000.00 - - - - 6.00 30,000.00 180,000.00
2 Pas. Kbl dr SDP.1 Gedung ke PP.1 NYY 4x6 mm NYY1 x 16 mm M' 6.00 25,000.00 150,000.00 - - - - 6.00 25,000.00 150,000.00
3 Pas. Kbl dr SDP.1 Gedung ke PP.2 NYY 4x6 mm NYY 1 x 16 mm M' 6.00 20,000.00 120,000.00 - - - - 6.00 20,000.00 120,000.00

Sub Total Pekerjaan Perlengkapan Utama/Equement 450,000.00 - - 450,000.00

c. Kabel Power Lantai 2


1 Pas. Kbl dr MDP Gedung ke SDP.2 NYY 4x16 mm NYY 1 x 16 mm M1 18.00 25,000.00 450,000.00 - - - - 18.00 25,000.00 450,000.00

Sub Total Pekerjaan Perlengkapan Utama/Equement 450,000.00 - - 450,000.00

Sub Total Pekerjaan Perlengkapan Utama/Equement 2,400,000.00 - - 2,400,000.00

D. Pek. Panel Power


a. Panel Panel Listrik
1 Pek. Panel MDP Gedung Lantai 1 Unit 1.00 3,627,700.00 3,627,700.00 - - - - 1.00 3,627,700.00 3,627,700.00
2 Pek. Panel Penerangan PP Lantai 1 Unit 1.00 3,627,700.00 3,627,700.00 - - - - 1.00 3,627,700.00 3,627,700.00
3 Pek. Panel Penerangan PP Lantai 2 Unit 1.00 3,848,200.00 3,848,200.00 - - - - 1.00 3,848,200.00 3,848,200.00

Sub Total Pekerjaan Panel 11,103,600.00 - - 11,103,600.00

E Pek. Penangkal Petir


1 Radius Proteksi 150 M (Non Konvensional)
1 Pas. Air Terminal Radius Proteksi 150 M Ttk 1.00 1,123,000.00 1,123,000.00 - - - - 1.00 1,123,000.00 1,123,000.00
3 Inst. Obstruction lamp (NYM 3 x 2.5 mm2) ke PP-AC atap bh 1.00 1,953,000.00 1,953,000.00 - - - - 1.00 1,953,000.00 1,953,000.00
4 Down Conductor Cable NYY 1 x 70 mm2 M' 42.00 20,000.00 840,000.00 - - - - 42.00 20,000.00 840,000.00
5 Pas. Instalasi grounding (minimal kedalaman 6 m dengan tahanan Ttk 1.00 10,615,000.00 10,615,000.00 - - - - 1.00 10,615,000.00 10,615,000.00
pemburnian = 1 Ohm )
6 Copper rod diameter 5/8" Unit 1.00 500,000.00 500,000.00 - - - - 1.00 500,000.00 500,000.00
7 Pek. Tower Tree Eangle Penangkal Petir t = 12 M Ls 1.00 2,000,000.00 2,000,000.00 - - - - 1.00 2,000,000.00 2,000,000.00
Sub Total Penangkal Petir 17,031,000.00 - - 17,031,000.00

II PEKERJAAN MEKANIKAL

A Pek. Instalasi Air Bersih


1 a. Peralatan Instalasi Air Bersih Roof Tank bh 12.00 5,000.00 60,000.00 - - - - 12.00 5,000.00 60,000.00
1 Pas. Gate Valve Æ 2 ½ / 65 mm (Bronze) bh 1.00 50,000.00 50,000.00 - - - - 1.00 50,000.00 50,000.00
2 Pas. Check Valve Æ 2 ½ 65 mm (Bronze) bh 2.00 22,000.00 44,000.00 - - - - 2.00 22,000.00 44,000.00
3 Pas. Flexible Sizs Æ 2 ½ 65mm bh 4.00 30,000.00 120,000.00 - - - - 4.00 30,000.00 120,000.00
4 Pas. Y strainer Æ 2½ 65mm (Bronze) bh 4.00 40,000.00 160,000.00 - - - - 4.00 40,000.00 160,000.00
5 Pas. Pressure Gauge Cap 0-15 kg/ cm² bh 1.00 25,000.00 25,000.00 - - - - 1.00 25,000.00 25,000.00
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
6 Pas. Water Level control untuk pompa trasfer bh 1.00 50,000.00 50,000.00 - - - - 1.00 50,000.00 50,000.00
7 Pas. Air Release air Valve (ARV) dia 25 mm bh 1.00 25,000.00 25,000.00 - - - - 1.00 25,000.00 25,000.00
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
8 Pas. Stop Kran Æ ½ " bh 1.00 40,000.00 40,000.00 - - - - 1.00 40,000.00 40,000.00
9 Pas. Ball Valve Æ ½" bh 1.00 15,000.00 15,000.00 - - - - 1.00 15,000.00 15,000.00
10 Pas. Pipa Header Gift Æ 4" m' 6.00 85,000.00 510,000.00 - - - - 6.00 85,000.00 510,000.00
11 Pas. Instalasi Pipa Riser Dalam Shap PPR PN - 10 Dia. 50 mm Booster m' 18.00 25,000.00 450,000.00 - - - - 18.00 25,000.00 450,000.00
12 Pek. Pemipahan instalasi pompa Pipa Drain PVC Valve PVC Tangga dan Pen Ls 1.00 1,500,000.00 1,500,000.00 - - - - 1.00 1,500,000.00 1,500,000.00
Instalasi Air Bersih Rooftank

Sub Total Pek. Instalasi Air Bersih 3,049,000.00 - - 3,049,000.00

b. Tangki Rooftank
1 Roof Tank FRP Panel Kapasitas 6 M3 Set 1.00 3,750,000.00 3,750,000.00 - - - - 1.00 3,750,000.00 3,750,000.00
Lengkap dengan dudukan pondasi dan pipa over
flow dan sistem drain Termasuk tangga pengontrol

c. Instalasi Air Bersih Pipa PPR Klas PN -10 Lantai 1


(termasuk Accessories & Support)
1 Pas. Pipa PPR PN - 10 Dia. 50 mm M' 5.00 125,000.00 625,000.00 - - - - 5.00 125,000.00 625,000.00
2 Pas. Pipa PPR PN - 10 Dia. 32 mm M' 43.00 85,000.00 3,655,000.00 - - - - 43.00 85,000.00 3,655,000.00
3 Pas. Pipa PPR PN - 10 Dia. 25 mm M' 8.00 75,000.00 600,000.00 - - - - 8.00 75,000.00 600,000.00
4 Pas. Pipa PPR PN - 10 Dia. 20 mm M' 36.00 55,000.00 1,980,000.00 - - - - 36.00 55,000.00 1,980,000.00
5 Gate Valve Æ 1/32 mm (Bronze) Bh 2.00 45,000.00 90,000.00 - - - - 2.00 45,000.00 90,000.00

Sub Total Instalasi Air Bersih Pipa PPR Klas PN -10 Lantai 1 6,950,000.00 - - 6,950,000.00

d. Instalasi Air Bersih PPR Klas PN 10 Lantai 2


termasuk Accessories & Support)
1 Pas. Pipa PPR PN -10 Dia 50 mm M' 5.00 125,000.00 625,000.00 - - - - 5.00 125,000.00 625,000.00
2 Pas. Pipa PPR PN -10 Dia 32 mm M' 13.00 85,000.00 1,105,000.00 - - - - 13.00 85,000.00 1,105,000.00
3 Pas. Pipa PPR PN - 10 Dia 25 mm M' 8.00 75,000.00 600,000.00 - - - - 8.00 75,000.00 600,000.00
4 Pas. Pipa PPR PN - 10 Dia 20 mm M' 36.00 55,000.00 1,980,000.00 - - - - 36.00 55,000.00 1,980,000.00
5 Gate Valve Æ 1/32 mm (Bronze) Bh 2.00 35,000.00 70,000.00 - - - - 2.00 35,000.00 70,000.00

Sub Total Instalasi Air Bersih Pipa PPR Klas PN -10 Lantai 2 4,380,000.00 - - 4,380,000.00

Sub Total Pekerjaan Instalasi Air Bersih 18,129,000.00 - - 18,129,000.00

B Pek. Instalasi Air Bekas, Kotor dan Hujan


a. Instalasi Air Bekas & Kotor Lantai 1
1 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Bekas M' 12.00 65,000.00 780,000.00 - - - - 12.00 65,000.00 780,000.00
2 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Kotor M' 12.00 65,000.00 780,000.00 - - - - 12.00 65,000.00 780,000.00
3 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Bekas M' 14.00 45,000.00 630,000.00 - - - - 14.00 45,000.00 630,000.00
4 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Kotor M' 16.00 45,000.00 720,000.00 - - - - 16.00 45,000.00 720,000.00
5 Pas. Instalasi Pipa PVC Kls AW Æ 2" Air Bekas M' 22.00 25,000.00 550,000.00 - - - - 22.00 25,000.00 550,000.00
6 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/2" Venting M' 8.00 16,000.00 128,000.00 - - - - 8.00 16,000.00 128,000.00
7 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/4" Venting M' 12.00 12,000.00 144,000.00 - - - - 12.00 12,000.00 144,000.00
8 Pas. Clean Out diameter 100 Bh 2.00 25,000.00 50,000.00 - - - - 2.00 25,000.00 50,000.00
9 Pas. Bok Kontrol 600x600x600 mm + Penutup atas Besi Tempa / Cor M' 2.00 750,000.00 1,500,000.00 - - - - 2.00 750,000.00 1,500,000.00

Sub Total Instalasi Air Bekas & Kotor Lantai 1 5,282,000.00 - - 5,282,000.00

b. Instalasi Air Bekas & Kotor Lantai 2


1 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Bekas M' 4.00 65,000.00 260,000.00 - - - - 4.00 65,000.00 260,000.00
2 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Kotor M' 4.00 65,000.00 260,000.00 - - - - 4.00 65,000.00 260,000.00
3 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Bekas M' 14.00 45,000.00 630,000.00 - - - - 14.00 45,000.00 630,000.00
4 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Kotor M' 10.00 45,000.00 450,000.00 - - - - 10.00 45,000.00 450,000.00
5 Pas. Instalasi Pipa PVC Kls AW Æ 2" Air Bekas M' 18.00 25,000.00 450,000.00 - - - - 18.00 25,000.00 450,000.00
SESUAI KONTRAK PEKERJAAN TAMBAH/KURANG SESUAI PERHITUNGAN MC-0
NO URAIAN ITEM PEKERJAAN SATUAN HARGA SATUAN JUMLAH HARGA HARGA SATUAN JUMLAH HARGA
VOLUME PEKERJAAN TAMBAH PEKERJAAN KURANG VOLUME
( Rp. ) ( Rp.) ( Rp. ) ( Rp.)
1 2 3 4 Vulume Jumlah Harga (Rp) Vulume Jumlah Harga (Rp)
6 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/2" Venting M' 8.00 16,000.00 128,000.00 - - - - 8.00 16,000.00 128,000.00
7 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/4" Venting M' 12.00 12,000.00 144,000.00 - - - - 12.00 12,000.00 144,000.00
8 Pas. Clean Out diameter 100 Bh 2.00 25,000.00 50,000.00 - - - - 2.00 25,000.00 50,000.00

Sub Total Instalasi Air Bekas & Kotor Lantai 2 2,372,000.00 - - 2,372,000.00

c. Instalasi Air Hujan


1 Pas. Intalasi Pipa PVC Kls AW Æ 6" Air Hujan Dalam Tanah M' 22.00 65,000.00 1,430,000.00 - - - - 22.00 65,000.00 1,430,000.00
2 Pas. Intalasi Pipa PVC Kls AW Æ 4" Air Kotor M' 46.00 45,000.00 2,070,000.00 - - - - 46.00 45,000.00 2,070,000.00
Roof Drain Besi Tempa Æ 4" / 100 MM Bh 8.00 75,000.00 600,000.00 - - - - 8.00 75,000.00 600,000.00

Sub Total Instalasi Air Hujan 4,100,000.00 - - 4,100,000.00

Sub Total Pekerjaan Instalasi Air Kotor 11,754,000.00 - - 11,754,000.00

D Trunking Cable
a. Pek. Kabel Tray Lantai 1
1 Pas. Kabel Ladder Elektrikal 400 x 100 mm M' 36.00 325,000.00 11,700,000.00 - - - - 36.00 325,000.00 11,700,000.00
2 Pas. Kabel Ladder Elektrikal 300 x 100 mm M' 36.00 275,000.00 9,900,000.00 - - - - 36.00 275,000.00 9,900,000.00

Sub Total Pek. Kabel Tray Lantai 1 21,600,000.00 - - 21,600,000.00

b. Pek. Kabel Tray Lantai 2


1 Pas. Kabel Ladder Elektrikal 400 x 100 mm M' 36.00 325,000.00 11,700,000.00 - - - - 36.00 325,000.00 11,700,000.00
2 Pas. Kabel Ladder Elektrikal 300 x 100 mm M' 36.00 275,000.00 9,900,000.00 - - - - 36.00 275,000.00 9,900,000.00

Sub Total Pek. Kabel Tray Lantai 2 21,600,000.00 - - 21,600,000.00

Sub Total Pekerjaan Trunking Cable 43,200,000.00 - - 43,200,000.00

F Fire Extinguisher (Racun Api)


a. Racun Api Lantai 1
1 FE, Tipe ABC Dry Chemical Kapasitas 6 kg Unit 7.00 850,000.00 5,950,000.00 - - - - 7.00 850,000.00 5,950,000.00

a. Racun Api Lantai 1


1 FE, Tipe ABC Dry Chemical Kapasitas 6 kg Unit 6.00 850,000.00 5,100,000.00 - - - - 6.00 850,000.00 5,100,000.00

Sub Total Pekerjaan Fire Extinguisher (Racun Api) 11,050,000.00 - - 11,050,000.00


JUMLAH 3,823,043,382.03 693,390,239.58 740,649,766.38 3,788,601,549.75
PPN 10 % 382,304,338.20 PPN 11 % 416,746,170.47
TOTAL 4,205,347,720.23 TOTAL 4,205,347,720.23
DIBULATKAN 4,205,347,000.00 DIBULATKAN 4,205,347,000.00
TERBILANG : EMPAT MILYARD DUA RATUS LIMA JUTA TIGA RATUS EMPAT PULUH TUJUH RIBU RUPIAH.

Solok, 14 Juli 2022


Diperiksa Oleh Dibuat Oleh
Mengetahui Oleh Diketahui Oleh Konsultan Pengawas Kontraktor Pelaksana
Pengguna Anggaran Pejabat Pembuat Komitmen CV. RESTU GRAHA CIPTA CV. HAIKAL
Selaku
Kepala Dinas PUPR Kota Solok

AFRIZAL, M. ENG RIKA FEBRIYANTI, ST. MT AFNI HASAN RICKY AZWIR


NIP. 19680415 199703 1008 NIP. 19800203 200604 2009 Team Leader Site Manager
PERHITUNGAN VOLUME

PEKERJAAN : LANJUTKAN PEMBANGUNAN KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK
TAHUN ANGGARAN : 2022

NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

I. PEKERJAAN PERSIAPAN
A PEKERJAAN PENDAHULUAN
Penerapan Keamanan Kesehatan dan Keselamatan Kerja (K3)
A. SOSIALISASI DAN PROMOSI K3
a. Poster Lb
B. ALAT PELINDUNG KERJA
a.Penahan Jatuh (SafetyBelt) Bh
C.SOSIALISASI DAN PROMOSI K3
a.Topi Pelindung (Safety Helmet) Bh
b.Sepatu Keselamatan (Safety Shoes) Psg
c.Rompi keselamatan (Safety Vest) Bh
D.FASILITAS SARANA KESEHATAN
a.Peralatan P3K Ls
SUB TOTAL I A

II PEKERJAAN STRUKTUR LANTAI -I


A PEKERJAAN BETON KONVEKSIONAL
1. Pek. Balok B-1.2 25 x 35, K -250, U - 39
a Beton K-250 (Ready Mix) M³
b Begisting / Cetakan M²
c Pembesian Kg

B PEKERJAAN BETON PRAKTIS K -225 U - 24


1. Balok Praktis 15/20
a Beton K-225 M³
b Begisting / Cetakan M²
c Pembesian Kg

2. Pet. Beton TB 10 cm
a Beton K-225 M3
Type 1 (Pintu dan Jendela Samping Kiri dan Kanan)
Panjang = 1.800 M1
Lebar = 0.600 M1
Tinggi = 0.100 M1
Unit = 2.000
Volume = 0.216 M3

Type 2 (Jendela Belakang)


Panjang = 2.300 M1
Lebar = 0.600 M1
Tinggi = 0.100 M1
Unit = 3.000
Volume = 0.414 M3

Type 3 (Jendela Vetilasi Belakang/Tangga)


Panjang = 2.100 M1
Lebar = 0.600 M1
Tinggi = 0.100 M1
Unit = 1.000
Volume = 0.126 M3

Type 4 (Jendela Vetilasi Belakang/WC)


Panjang = 3.300 M1
Lebar = 0.600 M1
Tinggi = 0.100 M1
Unit = 2.000
Volume = 0.396 M3
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume Total = 1.152 M3 1.152 M³

b Begisting / Cetakan M2 Type 1 (Pintu dan Jendela Samping Kiri dan Kanan)
Panjang = 1.800 M1
Lebar = 0.600 M1
Unit = 2.000
Volume = 2.160 M2

Panjang = 3.200 M1
Tinggi = 0.170 M1
Unit = 2.000
Volume = 1.088 M2

Type 2 (Jendela Belakang)


Panjang = 2.300 M1
Lebar = 0.600 M1
Unit = 3.000
Volume = 4.140 M2

Panjang = 3.500 M1
Tinggi = 0.170 M1
Unit = 3.000
Volume = 1.785 M2

Type 3 (Jendela Vetilasi Belakang/Tangga)


Panjang = 2.100 M1
Lebar = 0.600 M1
Unit = 1.000
Volume = 1.260 M2

Panjang = 3.300 M1
Lebar = 0.170 M1
Unit = 1.000
Volume = 0.561 M2

Type 4 (Jendela Vetilasi Belakang/WC)


Panjang = 3.300 M1
Lebar = 0.600 M1
Unit = 2.000
Volume = 3.960 M2

Panjang = 4.500 M1
Lebar = 0.170 M1
Unit = 2.000
Volume = 1.530 M2

Volume Total = 16.484 M2 16.484 M2

c Pembesian Kg 223.476 Kg

3 Kolom 15/23 (KP.1.1)


a Beton K-225 M2
Panjang = 3.500 M1
Lebar = 0.150 M1
Tinggi = 0.230 M1
Unit = 4.000
Volume = 0.483 M1 0.483 M2

b Begisting / Cetakan M²
Tinggi = 3.500 M1
Lebar = 0.150 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Panjang = 0.230 M1
Unit = 4.000
Volume = 12.600 M2 12.600 M²

c Pembesian Kg 104.449 Kg
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

3. Kolom 20/20 (Pintu Utama)-(KP.1.2)


a Beton K-225 M³
Panjang = 7.000 M1
Lebar = 0.200 M1
Tinggi = 0.200 M1
Unit = 2.000
Volume = 0.560 M1 0.560 M³

b Begisting / Cetakan M² Kolom Samping Kolom Utama


Tinggi = 2.400 M1
Lebar 1 = 0.740 M1
Unit = 2.000
Volume = 3.552 M2

Kolom Berdiri sendiri


Tinggi = 2.400 M1
Lebar = 0.940 M1
Unit = 2.000
Volume = 4.512 M2

Panjang = 2.200 M1
Lebar = 0.740 M1
Unit = 2.000
Volume = 3.256 M2

Grand Total = 11.320 M2 11.320 M2

c Pembesian Kg 109.002 Kg

4. Kolom 15/50 (KP.1.3)


a Beton K-225 M³
Panjang = 3.500 M1
Lebar = 0.150 M1
Tinggi = 0.500 M1
Unit = 2.000
Volume = 0.525 M1 0.525 M³

b Begisting / Cetakan M²
Panjang = 3.500 M1
Lebar = 1.440 M1
Unit = 2.000
Volume = 10.080 M2

Grand Total = 10.080 M2 10.080 M2

c Pembesian Kg 85.532 Kg

5. Kolom Praktis 10/15 (KP.1.4) M³


a Beton K-225 Tinggi = 3.500 M1
Lebar = 0.100 M1
Panjang = 0.150 M1
Unit = 29.000
Volume = 1.523 M3 1.523 M³

b Begisting / Cetakan M²
Panjang = 3.500 M1
Lebar = 0.540 M1
Unit = 29.000
Volume = 54.810 M2 54.810 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

c Pembesian Kg 423.821 Kg

6. Kolom Praktis 10/15 (KP.1.5) M³


a Beton K-225 Tinggi = 2.800 M1
Lebar = 0.100 M1
Panjang = 0.150 M1
Unit = 26.000
Volume = 1.092 M3 1.092 M³

b Begisting / Cetakan M²
Panjang = 2.800 M1
Lebar = 0.580 M1
Unit = 26.000
Volume = 42.224 M2 42.224 M2

c Pembesian Kg 338.778 Kg

8. Balok 10/15 (BP.1.6) - Balok diatas jendela


a Beton K-225 M³
Panjang = 1.800 M1
Lebar = 0.100 M1
Tinggai = 0.150 M1
Unit = 3.000
Volume = 0.081 M3 0.081 M³

b Begisting / Cetakan M²
Panjang = 1.800 M1
Tinggi = 0.540 M1
Unit = 3.000
Volume = 2.916 M2 2.916 M2

c Pembesian Kg = 22.928 Kg

9. Pondasi Plat Setempat 60/60


a Beton K-225 M³
Panjang = 0.600 M1
Lebar = 0.600 M1
Tinggai = 0.250 M1
Unit = 3.000
Volume = 0.270 M3 0.270 M³
b Begisting / Cetakan M²
Panjang = 0.600 M1
Tinggi = 0.250 M1
Sisi = 4.000
Unit = 3.000
Volume = 1.800 M2 1.800 M2

c Pembesian Kg = 117.074 Kg

9. Kolom 30/30
a Beton K-225 M³
Tinggi = 4.550 M1
Lebar = 0.300 M1
Lebar = 0.300 M1
Unit = 3.000
Volume = 1.229 M3 1.229 M³

b Begisting / Cetakan M²
Tinggi = 4.550 M1
Lebar = 0.300 M1
Sisi = 4.000
Unit = 3.000
Volume = 16.380 M2 16.380 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

c Pembesian Kg = 257.202 Kg

SUB TOTAL II A-B

III PEKERJAAN STRUKTUR LANTAI II


A PEKERJAAN BETON KONVEKSIONAL
1. Pek. Balok B-22 25x35, K -250, U - 39
a Beton K-250 (Ready Mix) M3 Panjang
As A = 13.8 M1

As C = 13.8 M1

As D = 13.8 M1

As E = 13.2 M1

As F = 13.2 M1

As F' = 13.2 M1

Total = 81.00 M1

Panjang = 81.000 M1
Lebar = 0.250 M1
Tinggi = 0.350 M1
Volume = 7.088 M3 7.088 M³

b Begisting / Cetakan M²
Panjang
As A = 13.8 M1

As C = 13.8 M1

As D = 13.8 M1

As E = 13.2 M1

As F = 13.2 M1

As F' = 13.2 M1

Total = 81.00 M1

Panjang = 81.000 M1
Tinggi = 0.840 M1
Lebar = 0.250 M1
Volume = 88.290 M2 88.290 M2

c Pembesian Kg 1623.459 Kg

2. Pek. Balok B-1.2 25x40, K-250, U-39 (Balok Tangga)


a Beton K-250 (Ready Mix) M3 Panjang
As E' = 3.30 M1

As F = 3.30 M1

Total = 6.60 M1

Panjang = 6.600 M1
Lebar = 0.250 M1
Tinggi = 0.400 M1
Volume = 0.660 M3

Plat Penutup Plafon


Panjang = 1.700 M1
Lebar = 0.100 M1
Tinggi = 0.450 M1
Volume = 0.077 M3

Volume Total = 0.737 M3 0.737 M³

b Begisting / Cetakan M² Panjang


As E' = 3.30 M1

Panjang = 3.300 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Tinggi = 0.700 M1
Lebar = 0.250 M1
Volume = 3.135 M2

Penutup Plafon
Panjang = 1.700 M1
Tinggi = 1.190 M1
Volume = 2.023 M2

As F = 3.30 M1

Panjang = 3.300 M1
Tinggi = 0.820 M1
Lebar = 0.250 M1
Volume = 3.531 M2

Volume Total = 8.689 M2 8.689 M2

c Pembesian Kg 145.596 Kg

3. Pek. Balok B-2.1 & B-2.3 30x40, K-250, U-39


a Beton K-250 (Ready Mix) M3 Panjang
As. 1 = 22.3 M1

As. 3 = 23.7 M1

As. 4 = 1.4 M1

As. 5 = 1.4 M1

As. 6 = 1.4 M1

As. 7 = 23.7 M1

As. 9 = 22.3 M1

Total = 96.20 M1

Panjang = 96.200 M1
Lebar = 0.300 M1
Tinggi = 0.400 M1
Volume = 11.544 M3 11.544 M³

b Begisting / Cetakan M² Panjang


As. 1 = 22.3 M1

Samping Kiri Panjang = 22.300 M1


Tinggi = 0.470 M1
Volume = 10.481 M2

Alas Panjang = 19.800 M1


Lebar = 0.300 M1
Volume = 5.940 M2

Samping Kanan Panjang = 21.050 M1


Tinggi = 0.470 M1
Volume = 9.894 M2

Bawah Balok (penyangga balok) Panjang = 1.250 M1


Tinggi = 0.100 M1
Volume = 0.125 M2

Penutup Balok (ujung Balok) Tinggi = 0.450 M1


Lebar = 0.300 M1
Sisi = 2.000
Volume = 0.270 M2

As. 3 = 23.7 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Samping Kiri Panjang = 22.450 M1


Tinggi = 0.470 M1
Volume = 10.552 M2

Samping Kanan Panjang = 7.200 M1


Tinggi = 0.470 M1
Volume = 3.384 M2

Samping Kanan bawah plat Panjang = 15.250 M1


Tinggi = 0.350 M1
Volume = 5.338 M2

Bawah Balok Panjang = 1.250 M1


Tinggi = 0.100 M1
Volume = 0.125 M2

Alas Panjang = 20.900 M1


Tinggi = 0.300 M1
Volume = 6.270 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Penutup Balok Tinggi = 0.470 M1


Lebar = 0.300 M1
Sisi = 2.000
Volume = 0.282 M2

As. 4 = 1.400
Samping Kiri dan samping kanan Panjang = 1.100 M1
Tinggi = 0.940 M1
Volume = 1.034 M2

Alas Panjang = 1.100 M1


Lebar = 0.300 M1
Volume = 0.330 M2

Penutup Balok Tinggi = 0.470 M1


Lebar = 0.300 M1
Sisi = 1.000
Volume = 0.141 M2

As. 5 = 1.400
Samping Kiri dan samping kanan Panjang = 1.100 M1
Tinggi = 0.900 M1
Volume = 0.990 M2

Alas Panjang = 1.100 M1


Lebar = 0.300 M1
Volume = 0.330 M2

Penutup Balok Tinggi = 0.450 M1


Lebar = 0.300 M1
Sisi = 1.000
Volume = 0.135 M2

As. 6 = 1.400
Samping Kiri dan samping kanan Panjang = 1.100 M1
Tinggi = 0.900 M1
Volume = 0.990 M2

Alas Panjang = 1.100 M1


Lebar = 0.300 M1
Volume = 0.330 M2

Penutup Balok Tinggi = 0.450 M1


Lebar = 0.300 M1
Sisi = 1.000
Volume = 0.135 M2

As. 7 = 23.7 M1

Samping Kiri Panjang = 22.450 M1


Tinggi = 0.350 M1
Volume = 7.858 M2

Samping Kanan Panjang = 7.200 M1


Tinggi = 0.470 M1
Volume = 3.384 M2

Samping Kanan bawah plat Panjang = 15.250 M1


Tinggi = 0.330 M1
Volume = 5.033 M2

Bawah Balok Panjang = 1.250 M1


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Tinggi = 0.100 M1
Volume = 0.125 M2

Alas Panjang = 20.900 M1


Tinggi = 0.300 M1
Volume = 6.270 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Penutup Balok Tinggi = 0.450 M1


Lebar = 0.300 M1
Sisi = 2.000
Volume = 0.270 M2

As. 9 = 22.3 M1

Samping Kiri Panjang = 22.300 M1


Tinggi = 0.470 M1
Volume = 10.481 M2

Alas Panjang = 19.800 M1


Lebar = 0.300 M1
Volume = 5.940 M2

Samping Kanan Panjang = 21.050 M1


Tinggi = 0.470 M1
Volume = 9.894 M2

Bawah Balok Panjang = 1.250 M1


Tinggi = 0.100 M1
Volume = 0.125 M2

Penutup Balok Tinggi = 0.450 M1


Lebar = 0.300 M1
Sisi = 2.000
Volume = 0.270 M2

Luas Total = 106.723 M1 106.723 M2

c Pembesian Kg 1793.863 Kg

4. Pek. Balok B-2.4 30x40, K-250, U-39


a Beton K-250 (Ready Mix) M3 Panjang
As 4 = 16.53 M1

As 5 = 16.53 M1

As 6 = 16.53 M1

Jumlah = 49.59 M1

Panjang = 49.590 M1
Lebar = 0.300 M1
Tinggi = 0.280 M1
Volume = 4.166 M3 4.166 M³

b Begisting / Cetakan M²
As. 5, 6 dan 7
Samping Kanan dan Kiri Panjang = 15.530 M1
Tinggi = 0.350 M1
Sisi = 2.000
Volume = 10.871 M2

Alas Panjang = 14.530 M1


Tinggi = 0.300 M1
Volume = 4.359 M2

Jumlah Total = 15.230 M2


Dikali 3 = 45.69 M2 45.690 M2

c Pembesian Kg 1113.360 Kg

5. Pek. Balok B-2.5 25x35 K-250, U-39


a Beton K-250 (Ready Mix) M³ Panjang
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As. B' = 11.4 M1

As C = 13.2 M1

As. D = 13.2 M1

As. E = 13.2 M1

As. F = 13.2 M1

As. 3' = 1.55 M1

As. 6' = 1.55 M1

Jumlah 67.3 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Panjang = 67.300 M1
Lebar = 0.250 M1
Tinggi = 0.230 M1
Volume = 3.870 M3 3.870 M³

b Begisting / Cetakan
M2 As B' = 11.4 M1
Samping Kanan Panjang = 11.400 M1
Tinggi = 0.400 M1
Volume = 4.560 M2

Samping Kiri Panjang = 11.400 M1


Tinggi = 0.300 M1
Volume = 3.420 M2

Alas Panjang = 11.400 M1


Tinggi = 0.250 M1
Volume = 2.850 M2

As C 13.2
Samping Kanan dam Kiri Panjang = 13.200 M1
Tinggi = 0.300 M1
Sisi = 2.000
Volume = 7.920 M2

Alas Panjang = 13.200 M1


Tinggi = 0.250 M1
Volume = 3.300 M2

As D 13.2
Samping Kanan dam Kiri Panjang = 13.200 M1
Tinggi = 0.300 M1
Sisi = 2.000
Volume = 7.920 M2

Alas Panjang = 13.200 M1


Tinggi = 0.250 M1
Volume = 3.300 M2

As E 13.2
Samping Kanan dam Kiri Panjang = 13.200 M1
Tinggi = 0.300 M1
Sisi = 2.000
Volume = 7.920 M2

Alas Panjang = 13.200 M1


Tinggi = 0.250 M1
Volume = 3.300 M2

As F 13.2
Samping Kanan dam Kiri Panjang = 13.200 M1
Tinggi = 0.300 M1
Sisi = 2.000
Volume = 7.920 M2

Alas Panjang = 13.200 M1


Tinggi = 0.250 M1
Volume = 3.300 M2

As 3' = 1.55 M1
Samping Kanan Panjang = 1.550 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Tinggi = 0.300 M1
Volume = 0.465 M2

Samping Kiri Panjang = 1.800 M1


Tinggi = 0.420 M1
Volume = 0.756 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Alas Panjang = 1.550 M1


Tinggi = 0.250 M1
Volume = 0.388 M2

As 6' = 1.55 M1
Samping Kanan Panjang = 1.550 M1
Tinggi = 0.300 M1
Volume = 0.465 M2

Samping Kiri Panjang = 1.800 M1


Tinggi = 0.400 M1
Volume = 0.720 M2

Alas Panjang = 1.550 M1


Tinggi = 0.250 M1
Volume = 0.388 M2

Jumlah Total = 58.891 M2 58.891 M2

c Pembesian Kg 1296.762 Kg

6. Pek. Kolom 30x50, K.250, U-39


a Beton K-250 (Ready Mix)
Panjang = 0.500 M1
Lebar = 0.300 M1
Tinggi = 3.500 M1
Unit = 6.000 M1
Volume = 3.150 M3

Jumlah Total = 3.150 M3 3.150 M3


b Begisting / Cetakan
Panjang = 1.280 M1
Lebar = 0.600 M1
Tinggi = 3.500 M1
Unit = 6.000 M1
Volume = 39.480 M3

Jumlah Total = 39.480 M2 39.480 M2

c Pembesian = 633.7064 Kg

5. Pek. Plat Lantai Tb 12, K-250, U-39


a Beton K-250 (Ready Mix) M3 Bahagian A
Panjang = 15.530 M1
Lebar = 14.100 M1
Tinggi = 0.120 M1
Volume = 26.277 M3

Bahagian B
Panjang = 11.400 M1
Lebar = 1.800 M1
Tinggi = 0.120 M1
Volume = 2.462 M3

Volume Total = 28.739 M3

Pengurangan C
Panjang = 4.000 M1
Lebar = 3.300 M1
Tinggi = 0.120 M1
Volume = 1.584 M3
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 38.360 M3 38.360 M³


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

b Begisting / Cetakan M² Bahagian A dan D


Panjang = 1.700 M1
Lebar = 1.550 M1
Bahagian = 2.000
Volume = 5.270 M2

Bahagian B dan C
Panjang = 3.300 M1
Lebar = 1.550 M1
Bahagian = 2.000
Volume = 10.230 M2

Bahagian E, F G dan H
Panjang = 3.300 M1
Lebar = 6.150 M1
Bahagian = 4.000
Volume = 81.180 M2

Bahagian I, J, K dan L
Panjang = 3.300 M1
Lebar = 1.550 M1
Bahagian = 4.000
Volume = 20.460 M2

Bahagian M,N dan P


Panjang = 3.300 M1
Lebar = 1.550 M1
Bahagian = 4.000
Volume = 20.460 M2

Bahagian O
Panjang = 3.300 M1
Lebar = 2.050 M1
Bahagian = 1.000
Volume = 6.765 M2

Bahagian Q, R, S dan T
Panjang = 3.300 M1
Lebar = 0.680 M1
Bahagian = 4.000
Volume = 8.976 M2

Jumlah Total = 319.680 M2 319.680 M2

c Pembesian Kg 4,335.82 Kg

6. Pek. Plat Tangga + Bordes


a Beton K-250 (Ready Mix) M3
Plat Tangga Trap 1
Panjang = 3.540 M1
Lebar = 1.650 M1
Tinggi = 0.150 M1
Volume = 0.876 M3
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Anak Tangga
Lebar = 0.300 M1
Tinggi = 0.190 M1
Panjang = 1.650 M1
Anak Tangga = 10.000
Volume = 0.470 M3

Plat Bordes
Panjang = 3.500 M1
Lebar = 1.380 M1
Tinggi = 0.150 M1
Volume = 0.725 M3

Plat Tangga Trap 2


Panjang = 3.540 M1
Lebar = 1.650 M1
Tinggi = 0.150 M1
Volume = 0.876 M3

Anak Tangga
Lebar = 0.300 M1
Tinggi = 0.190 M1
Panjang = 1.650 M1
Anak Tangga = 10.000
Volume = 0.470 M3

Volume Total = 4.80 M3 4.80 M³

b Begisting / Cetakan M²
Plat Tangga Trap 1 dan 2
Panjang = 3.600 M1
Lebar = 1.650 M1
Bahagian = 2.000
Volume = 11.880 M2

Anak Tangga
Panjang = 1.650 M1
Lebar = 0.190 M1
Bahagian = 20.000
Volume = 6.270 M2

Anak Tangga Samping Kiri dan Kanan


Panjang = 3.540 M1
Lebar = 0.200 M1
Bahagian = 2.000
Volume = 1.416 M2

Anak Tangga Samping Kiri dan Kanan


Panjang = 0.300 M1
Lebar = 0.190 M1
Bahagian = 20.000
Volume = 0.570 M2

Plat Bordes
Panjang = 3.500 M1
Lebar = 1.330 M1
Bahagian = 1.000
Volume = 4.655 M2

Jumlah Total = 96.000 M2 96.000 M2

c Pembesian Kg 1,056.00 Kg
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

B PEKERJAAN BETON PRAKTIS K-225 U-24


1. Kolom Praktis 15/15 M³
a Beton K-225 M³
b Begisting / Cetakan M²
c Pembesian Kg
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

2. Kolom Praktis 10/15 (KP.2.1)


a Beton K-225 Panjang = 3.500 M1
Lebar = 0.100 M1
Tinggi = 0.150 M1
Unit = 50.000
Volume = 2.625 M3 2.625 M³

b Begisting / Cetakan M²
Panjang = 3.500 M1
Lebar = 0.500 M1
Unit = 50.000
Volume = 87.500 M2 87.500 M2

c Pembesian Kg 710.597 Kg

3. Kolom Praktis 10/15 (KP.2.2)


a Beton K-225 Panjang = 2.800 M1
Lebar = 0.100 M1
Tinggi = 0.150 M1
Unit = 23.000
Volume = 0.966 M3 0.966 M³

b Begisting / Cetakan M²
Panjang = 2.800 M1
Lebar = 0.500 M1
Unit = 23.000
Volume = 32.200 M2 32.200 M2

c Pembesian Kg 272.547 Kg

4. Balok Praktis 15/20 M³


a Beton K-225 M³
Panjang = 3.500 M1
Lebar = 0.150 M1
Tinggi = 0.200 M1
Unit = 4.000
Volume = 0.420 M1 0.420 M³

b Begisting / Cetakan M² Panjang = 3.500 M1


Lebar = 0.400 M1
Unit = 4.000
Volume = 5.600 M2 5.600 M2

c Pembesian Kg 106.336 Kg

4. Pet Beton Tb 10 cm M³
a Beton K-225 M³ Type 1 (Jendela Samping-WC)
Panjang = 1.800 M1
Lebar = 0.600 M1
Tinggi = 0.080 M1
Unit = 2.000
Volume = 0.173 M3

Type 2 (Jendela Belakang)


Panjang = 2.300 M1
Lebar = 0.600 M1
Tinggi = 0.080 M1
Unit = 3.000
Volume = 0.331 M3

Type 3 (Jendela Vetilasi Belakang/Tangga)


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Panjang = 2.100 M1
Lebar = 0.600 M1
Tinggi = 0.080 M1
Unit = 1.000
Volume = 0.101 M3
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Type 4 (Jendela Vetilasi Belakang/WC)


Panjang = 3.300 M1
Lebar = 0.600 M1
Tebal = 0.080 M1
Unit = 2.000
Volume = 0.317 M3

Diatas Kaca Depan Panjang = 18.300 M1


Lebar = 0.750 M1
Tebal = 0.100 M1
Unit = 2.000
Volume = 2.745 M3

Diatas Kaca Belakang Panjang = 7.650 M1


Lebar = 0.750 M1
Tebal = 0.100 M1
Unit = 2.000
Volume = 1.148 M3

Volume Total = 4.814 M3 4.814 M³

b Begisting / Cetakan M² Type 1


Panjang = 1.800 M1
Lebar = 0.700 M1
Unit = 2.000
Volume = 2.520 M2

Panjang = 3.200 M1
Lebar = 0.080 M1
Unit = 2.000
Volume = 0.512 M2

Type 2
Panjang = 2.300 M1
Lebar = 0.700 M1
Unit = 3.000
Volume = 4.830 M2

Panjang = 3.500 M1
Lebar = 0.080 M1
Unit = 3.000
Volume = 0.840 M2

Type 3
Panjang = 2.100 M1
Lebar = 0.700 M1
Unit = 1.000
Volume = 1.470 M2

Panjang = 3.300 M1
Lebar = 0.080 M1
Unit = 1.000
Volume = 0.264 M2

Type 4
Panjang = 3.300 M1
Lebar = 0.700 M1
Unit = 2.000
Volume = 4.620 M2

Panjang = 4.500 M1
Lebar = 0.080 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Unit = 2.000
Volume = 0.720 M2

Diatas Kaca Panjang = 18.300 M1


Lebar = 0.750 M1
Unit = 2.000
Volume = 27.450 M2

Panjang = 21.300 M1
Tebal = 0.100 M1
Unit = 2.000
Volume = 4.260 M2

Panjang = 7.650 M1
Lebar = 0.750 M1
Unit = 2.000
Volume = 11.475 M2

Panjang = 9.900 M1
Tebal = 0.100 M1
Unit = 2.000
Volume = 1.980 M2

Volume Total = 60.941 M2 60.941 M2

c Pembesian Kg 689.180 Kg

SUB TOTAL II A B

IV PEKERJAAN STRUKTUR LT. PENTHOUSE (ATAP)


PEK. STRUKTUR BAJA RINGAN
1. Pek. Kolom 30x50, K-250, U-39
a Beton K-250 (Ready Mix) M³
Kolom R. Pompa Tinggi = 2.980 M1
Lebar = 0.300 M1
Panjang = 0.500 M1
Unit = 6.000
Volume = 2.682 M3

Kolom Atap Depan Tinggi = 2.000 M1


Lebar = 0.300 M1
Panjang = 0.500 M1
Unit = 4.000
Volume = 1.200 M3

Kolom Atap Belakang Tinggi = 1.000 M1


Lebar = 0.300 M1
Panjang = 0.500 M1
Unit = 4.000
Volume = 0.600 M3

Volume Total = 4.482 M3 4.482 M³


b Begisting / Cetakan M²

Kolom R. Pompa Tinggi = 3.100 M1


Lebar = 0.800 M1
Panjang = 1.000 M1
Unit = 4.000
Volume = 22.320 M2

Kolom Atap Tinggi = 2.000 M1


Lebar = 0.800 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Panjang = 1.000 M1
Unit = 4.000
Volume = 14.400 M2

Kolom Atap Belakang Tinggi = 1.000 M1


Lebar = 0.800 M1
Panjang = 1.000 M1
Unit = 4.000
Volume = 7.200 M2

Volume Total = 43.920 M2 43.920 M2

c Pembesian Kg 1002.516 Kg

2. Pek. Balok B-2.4 30x40, K-250, U-39


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

a Beton K-250 (Ready Mix) M³


Tinggi = 0.280 M1
Lebar = 0.300 M1
Panjang = 5.900 M1
Unit = 3.000
Volume = 1.487 M3 1.487 M³

b Begisting / Cetakan M²
Samping Kanan dan Kiri Panjang = 5.900 M1
Tinggi = 0.660 M1
Sisi = 3.000
Volume = 11.682 M2

Alas Panjang = 5.900 M1


Lebar = 0.300 M1
Unit = 3.000
Volume = 5.310 M2

Jumlah Total = 16.992 M2 16.992 M2

c Pembesian Kg 440.6626 Kg

3. Pek. Balok B-2.4 30x40, K-250, U-39


a Beton K-250 (Ready Mix) M³
Tinggi = 0.230 M1
Lebar = 0.250 M1
Panjang = 3.300 M1
Unit = 3.000
Volume = 0.569 M3 0.569 M³

Samping Kanan dan Kiri Panjang = 3.300 M1


Tinggi = 0.560 M1
Sisi = 4.000
Volume = 7.392 M2

Alas Panjang = 3.300 M1


Lebar = 0.250 M1
Unit = 4.000
Volume = 3.300 M2

Jumlah Total = 10.692 M2 10.692 M2

c Pembesian Kg 292.298 Kg

3. Pek. Plat Tb 10, K-250, U-39


a Beton K-250 (Ready Mix) M³
Tebal = 0.100 M1
Lebar = 7.700 M1
Panjang = 8.500 M1
Unit = 1.000
Volume = 6.545 M3 6.545 M³

b Begisting / Cetakan M²
Bahagian A dan B
Lebar = 3.300 M1
Panjang = 6.150 M1
Unit = 2.000
Volume = 40.590 M2

Bahagian C,E,G dan I


Lebar = 0.130 M1
Panjang = 3.300 M1
Unit = 4.000
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 1.716 M2

Bahagian D dan H
Lebar = 0.400 M1
Panjang = 7.500 M1
Unit = 2.000
Volume = 6.000 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Bahagian F dan J
Lebar = 0.500 M1
Panjang = 7.700 M1
Unit = 2.000
Volume = 7.700 M2

Volume Total = 56.006 M2 56.006 M2

c Pembesian Kg 1085.753 Kg

5 Kolom Praktis 9/13 (KP.2.2)


a Beton K-225 Tinggi = 1.820 M1
Lebar = 0.090 M1
Panjang = 0.130 M1
Unit = 4.000
Volume = 0.085 M3

Tinggi = 1.630 M1
Lebar = 0.090 M1
Panjang = 0.130 M1
Unit = 4.000
Volume = 0.076 M3

Tinggi = 1.450 M1
Lebar = 0.090 M1
Panjang = 0.130 M1
Unit = 4.000
Volume = 0.068 M3

Tinggi = 1.270 M1
Lebar = 0.090 M1
Panjang = 0.130 M1
Unit = 4.000
Volume = 0.059 M3

Tinggi = 0.400 M1
Lebar = 0.090 M1
Panjang = 0.130 M1
Unit = 7.000
Volume = 0.033 M3

Volume Total = 0.322 M3 0.322 M³

b Begisting / Cetakan
Tinggi = 1.820 M1
Lebar = 0.230 M1
Sisi = 2.000 M1
Unit = 4.000
Volume = 3.349 M2

Tinggi = 1.630 M1
Lebar = 0.230 M1
Sisi = 2.000 M1
Unit = 4.000
Volume = 2.999 M2

Tinggi = 1.450 M1
Lebar = 0.230 M1
Sisi = 2.000 M1
Unit = 4.000
Volume = 2.668 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Tinggi = 1.270 M1
Lebar = 0.230 M1
Sisi = 2.000 M1
Unit = 4.000
Volume = 2.337 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Tinggi = 0.400 M1
Lebar = 0.230 M1
Sisi = 2.000 M1
Unit = 7.000
Volume = 1.288 M2

Volume Total = 12.641 M2 12.641 M2

c Pembesian 178.159 Kg

6. Balok Praktis 10/15


a Beton K-225
Atap Panjang = 139.950 M1
Lebar = 0.090 M1
Panjang = 0.150 M1
Unit = 1.000
Volume = 1.889 M3 1.889 M3

b Begisting / Cetakan
Panjang = 140.000 M1
Tinggi = 0.200 M1
Sisi = 2.000 M1
Unit = 1.000
Volume = 56.000 M2 56.000 M2

c Pembesian 550.454 Kg

4. Pek. Struktur Baja Ringan Bangunan Utama M²


Panjang = 25.000 M1
Lebar = 9.600 M1
Unit = 2.000
Volume = 480.000 M2 480.000 M2

SUB TOTAL IV

V PEKERJAAN ATAP & PELINGKUP


1. Pek. Atap Bitumen Bergelombang 3 MM M²
Panjang = 25.200 M1
Lebar = 9.800 M1
Unit = 2.000
Volume = 493.920 M2 493.920 M2

2. Pek. Nok Bitumen Monolayer M'


3. Pek. Lisplank M'
Panjang = 51.200 M1
Lebar = 19.000 M1
Unit = 2.000
Volume = 140.400 M2 140.400 M2

4. Pek. Ornamen Kisi Hollow 40x60 Tb 2 MM Unit 2 bh


SUB TOTAL V

VI PEKERJAAN HALAMAN
1 Pek. Pagar
a Galian Tanah Biasa M³
b Pasangan Batu 1:4 M³
c Plesteran 1:4 M²
d Acian M²
2 Pek. Sloof 15/20
a Beton K-175 M³
b Begisting / Cetakan M²
c Pembesian Kg
3 Pek. Kolom 20/20
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

a Beton K-175 M³
b Begisting / Cetakan M²
c Pembesian Kg
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

4 Pek. Kolom 13/20


a Beton K-175 Kg
b Begisting / Cetakan M²
c Pembesian Kg
5 Pas. Dinding Bata 1:2 M²
6 Plesteran Dinding 1:2 M²
7. Pek. Acian M²
8 Afwerking Beton M²
9 Pas. Pintu Pagar Besi Hollow Finishing Cat Duco M²
10 Pas. Pagar Besi Hollow Finishing Cat Duco M²
11 Pengecatan Dg. Cat Air (Ex Dulux Weather Shield) M²
SUB TOTAL VI

PEKERJAAN ARSITEKTUR
PEKERJAAN ARSITEKTUR LANTAI - I
PEKERJAAN DINDING
a Pas. Dinding Batu Bata 1 : 2 M²
Toilet 1
As 6 dan As 8 Panjang = 5.640 M1
Tinggi = 0.800 M1
Unit = 2.000
Volume = 9.024 M2

As 7 Panjang = 4.130 M1
Tinggi = 0.800 M1
Volume = 3.304 M2

As E Panjang = 1.100 M1
Tinggi = 0.800 M1
Volume = 0.880 M2

As F Panjang = 6.600 M1
Tinggi = 0.800 M1
Volume = 5.280 M2

Toilet Pria Panjang = 7.850 M1


Tinggi = 0.800 M1
Volume = 6.280 M2

Toilet Wanita Panjang = 8.850 M1


Tinggi = 0.800 M1
Volume = 7.080 M2

Toilet 2 Panjang = 8.620 M1


Tinggi = 0.800 M1
Volume = 6.896 M2

Dibawah Kaca Depan kiri dan kanan Panjang = 18.300 M1


Tinggi = 0.200 M1
Unit = 2.000
Volume = 7.320 M2

Dibawah Kaca Belakang kiri dan kanan Panjang = 7.630 M1


Tinggi = 0.200 M1
Unit = 2.000
Volume = 3.052 M2

Volume = 49.116 M2 49.116 M2

b Pas. Dinding Batu Bata 1 : 4 M² Panjang = 8.270 M1


As 1 Tinggi = 3.400 M1
Volume = 28.118 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As 3 Panjang = 5.900 M1
Tinggi = 3.400 M1
Volume = 20.060 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As 4 Panjang = 2.500 M1
Tinggi = 3.680 M1
Volume = 9.200 M2

As 7 Panjang = 5.900 M1
Tinggi = 3.400 M1
Volume = 20.060 M2

Toilet Panjang = 4.130 M1


Tinggi = 2.000 M1
Volume = 8.260 M2

As 9 Panjang = 6.970 M1
Tinggi = 3.400 M1
Volume = 23.698 M2

As B Panjang = 7.120 M1
Tinggi = 3.500 M1
Sisi = 2.000
Volume = 49.840 M2

As C Panjang = 2.400 M1
Tinggi = 3.500 M1
Volume = 8.400 M2

As E Panjang = 5.020 M1
Tinggi = 3.500 M1
Volume = 17.570 M2

Panjang = 1.100 M1
Tinggi = 2.000 M1
Volume = 2.200 M2

As E' Panjang = 1.000 M1


Tinggi = 3.680 M1
Volume = 3.680 M2

As E'' Panjang = 1.800 M1


Tinggi = 3.680 M1
Volume = 6.624 M2

As F Panjang = 6.600 M1
Tinggi = 2.600 M1
Volume = 17.160 M2

Toilet Pria Panjang = 7.850 M1


Tinggi = 2.000 M1
Volume = 15.700 M2

Toilet Wanita Panjang = 8.850 M1


Tinggi = 2.000 M1
Volume = 17.700 M2

Toilet 2 Panjang = 8.620 M1


Tinggi = 2.000 M1
Volume = 17.240 M2

Volume = 265.510 M2 265.510 M2


Pengurangan
As 1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

BV.02 Lebar = 1.300 M1


Tinggi = 0.550 M1
Volume = 0.715 M2

P.3 Lebar = 0.800 M1


Tinggi = 1.900 M1
Volume = 1.520 M2
As 3
PJ.1 Lebar = 1.500 M1
Tinggi = 2.700 M1
Volume = 4.050 M2

Lebar = 0.500 M1
Tinggi = 2.250 M1
Volume = 1.125 M2
As 7
PJ.1 Lebar = 1.500 M1
Tinggi = 2.700 M1
Volume = 4.050 M2

Lebar = 0.500 M1
Tinggi = 2.250 M1
Volume = 1.125 M2
As B
PJ.1 Lebar = 1.500 M1
Tinggi = 2.700 M1
Unit = 2.000
Volume = 8.100 M2

Lebar = 0.500 M1
Tinggi = 2.250 M1
Unit = 2.000
Volume = 2.250 M2
As E
P.03 Lebar = 1.500 M1
Tinggi = 2.700 M1
Unit = 2.000
Volume = 8.100 M2

Lebar = 0.500 M1
Tinggi = 2.250 M1
Unit = 2.000
Volume = 2.250 M2

Lebar = 0.500 M1
Tinggi = 2.250 M1
Unit = 2.000
Volume = 2.250 M2

P.02 Lebar = 0.900 M1


Tinggi = 2.700 M1
Unit = 1.000
Volume = 2.430 M2

P.03 Lebar = 1.500 M1


Tinggi = 2.700 M1
Unit = 2.000
Volume = 8.100 M2

Lebar = 0.500 M1
Tinggi = 2.250 M1
Unit = 2.000
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 2.250 M2

Lebar = 0.500 M1
Tinggi = 2.250 M1
Unit = 2.000
Volume = 2.250 M2

As E'
PD.02 Lebar = 1.500 M1
Tinggi = 2.700 M1
Unit = 2.000
Volume = 8.100 M2
As F
JA.02 Lebar = 1.800 M1
Tinggi = 1.600 M1
Unit = 3.000
Volume = 8.640 M2

Lebar = 1.800 M1
Tinggi = 0.450 M1
Unit = 3.000
Volume = 2.430 M2

BV.01 Lebar = 0.850 M1


Tinggi = 0.550 M1
Unit = 2.000
Volume = 0.935 M2

BV.02 Lebar = 1.520 M1


Tinggi = 0.550 M1
Unit = 3.000
Volume = 2.508 M2

Volume Pengurangan 73.178 M2


Volume Kotor = 265.510 M2
Volume Bersih = 192.332 M2

c Plesteran Dinding 1 : 2 M²
Volume = 49.116 M2

Dikali 2 = 98.23 M2

d Plesteran Dinding 1 : 4 M²
Volume = 192.332 M2

Dikali 2 = 384.66 M2

e Pas. Acian Dinding M² Volume = 482.90 M2

f Afwerking Bidang Beton M²


As 1 a Lebar = 0.600 M1
Panjang = 1.000 M1

a. c. Tinggi = 3.500 M1

b. Unit
Volume
=
=
2.000
11.200 M2

b Lebar = 1.040 M1
Tinggi = 3.400 M1
Unit = 1.000
d. Volume = 4.440 M2

e. c&d Lebar = 1.280 M1


Tinggi = 3.400 M1
Unit = 2.000
d.
e.
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 9.360 M2

e Lebar = 0.570 M1
Tinggi = 3.400 M1
Unit = 1.000
Volume = 3.970 M2

As 2
a Lebar = 1.440 M1

a. Tinggi
Volume
=
=
3.500
5.040
M1
M2

b Lebar = 1.580 M1
d. Tinggi = 3.500 M1
Volume = 5.530 M2
b.
c Lebar = 1.120 M1
Tinggi = 3.500 M1
Volume = 3.920 M2

d Lebar = 0.600 M1
c. Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000
Volume = 11.200 M2

a.
d.

b.
e.

c. f.
c.
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

a. As 3 a Lebar
Tinggi
=
=
1.120
3.500
M1
M1
d. Volume = 3.920 M2

b Lebar = 1.450 M1
Tinggi = 3.500 M1
Volume = 5.075 M2

b. c Lebar
Tinggi
=
=
1.450
3.500
M1
M1

e. Volume = 5.075 M2

d Lebar = 1.300 M1
Tinggi = 3.500 M1
Volume = 4.550 M2

c. f. e Lebar
Tinggi
=
=
0.700
3.500
M1
M1
Volume = 2.450 M2

f Lebar = 1.600 M1
Tinggi = 3.500 M1
Volume = 5.600 M2

As 4 a Lebar = 1.150 M1
Tinggi = 3.500 M1

a. Volume = 4.025 M2

b Lebar = 1.450 M1
Tinggi = 3.500 M1
Volume = 5.075 M2

b. c Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000
Volume = 11.200 M2

c.

As 5 a Lebar = 1.150 M1

a. Tinggi
Volume
=
=
3.500
4.025
M1
M2

b Lebar = 1.450 M1
Tinggi = 3.500 M1
Volume = 5.075 M2

c Lebar = 0.600 M1
Panjang = 1.000 M1

b. Tinggi
Unit
=
=
3.500
2.000
M1

Volume = 11.200 M2

d Lebar = 1.200 M1
Tinggi = 3.500 M1
Volume = 4.200 M2

c.
NO
c. SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

d.
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

a. As. 6 a Lebar
Tinggi
=
=
1.150
3.500
M1
M1
Volume = 4.025 M2

b Lebar = 1.450 M1

b.
Tinggi = 3.500 M1
Volume = 5.075 M2

c Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1

c.
Unit = 2.000
Volume = 11.200 M2

As 7 a Lebar = 1.150 M1
Tinggi = 3.500 M1

a. d.
Volume = 4.025 M2

b Lebar = 1.150 M1
Tinggi = 3.500 M1
Volume = 4.025 M2

c Lebar = 1.450 M1

b. e. Tinggi
Volume
=
=
3.500
5.075
M1
M2

d Lebar = 1.300 M1
Tinggi = 3.500 M1

c.
Volume = 4.550 M2

e Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000
Volume = 11.200 M2

As 8 a Lebar = 1.300 M1
Tinggi = 3.500 M1
a. Volume = 4.550 M2

b Lebar = 1.300 M1
Tinggi = 3.500 M1
Volume = 4.550 M2

b. c Lebar
Tinggi
=
=
1.300
3.500
M1
M1
Volume = 4.550 M2

d Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000
c. Volume = 11.200 M2

d.
c.
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

d.
d.
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As 9 a Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1

a.
Unit = 2.000
Volume = 11.200 M2

d. b Lebar = 1.300 M1
Tinggi = 3.500 M1
Volume = 4.550 M2

b. c Lebar = 1.300 M1

e. Tinggi
Volume
=
=
3.500
4.550
M1
M2

d Lebar = 1.450 M1
Tinggi = 3.500 M1

c. Volume = 5.075 M2

e Lebar = 0.700 M1
Tinggi = 3.500 M1
Volume = 2.450 M2

Balok Sekeliling
As 1 Panjang = 14.300 M1
Tinggi = 0.540 M1
Volume = 7.722 M2
As 11
Panjang = 2.700 M1
Tinggi = 0.930 M1
Volume = 2.511 M2

As 3 Panjang = 6.700 M1
Tinggi = 0.930 M1
Volume = 6.231 M2

As 7 Panjang = 6.700 M1
Tinggi = 0.930 M1
Volume = 6.231 M2

As 9 Panjang = 14.300 M1
Tinggi = 0.540 M1
Volume = 7.722 M2
As 91
Panjang = 2.700 M1
Tinggi = 0.930 M1
Volume = 2.511 M2
As A
Panjang = 6.600 M1
Tinggi = 0.930 M1
Unit = 2.000
Volume = 12.276 M2
As F
Panjang = 19.800 M1
Tinggi = 0.540 M1
Volume = 10.692 M2

Volume Total = 283.88 M2 283.88 M2

g Pas. Batu Alam uk. 20x40 tb 15 M²


Lebar = 1.200 M1
Tinggi = 3.800 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Unit = 2.000
Volume = 9.120 M2 9.12 M2

h Pas. Balok Lathe / Blk Praktis


1.0 Beton K-225 M³
M² Panjang = 8.270 M1
As 1 Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.124 M2

As 3 Panjang = 5.900 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.089 M2

As 4 Panjang = 2.500 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.038 M2

As 7 Panjang = 5.900 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.089 M2

Toilet Panjang = 4.130 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.062 M2

As 9 Panjang = 6.970 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.105 M2

As B Panjang = 7.120 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Sisi = 2.000
Volume = 0.214 M2

As C Panjang = 2.400 M1
Lebar = 0.100 M1
Tinggi = 0.150 M1
Volume = 0.036 M2

As E Panjang = 5.020 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.075 M2

Panjang = 1.100 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.017 M2

As E' Panjang = 1.000 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.015 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As E'' Panjang = 1.800 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.027 M2

As F Panjang = 6.600 M1
Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.099 M2

Toilet Pria Panjang = 7.850 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.118 M2

Toilet Wanita Panjang = 8.850 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.133 M2

Toilet 2 Panjang = 8.620 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Volume = 0.129 M2

Dibawah Kaca Depan kiri dan kanan Panjang = 18.300 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Unit = 4.000
Volume = 1.098 M2

Dibawah Kaca Belakang kiri dan kanan Panjang = 7.630 M1


Tinggi = 0.150 M1
Lebar = 0.100 M1
Unit = 4.000
Volume = 0.458 M2

Volume = 2.923 M3 2.923 M3

13.3 Begisting M²
M² Panjang = 8.270 M1
As 1 Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 3.308 M2

As 3 Panjang = 5.900 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 2.360 M2

As 4 Panjang = 2.500 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 1.000 M2

As 7 Panjang = 5.900 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 2.360 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Toilet Panjang = 4.130 M1


Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 1.652 M2

As 9 Panjang = 6.970 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 2.788 M2

As B Panjang = 7.120 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Sisi = 2.000
Volume = 5.696 M2

As C Panjang = 2.400 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 0.960 M2

As E Panjang = 5.020 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 2.008 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Panjang = 1.100 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 0.440 M2

As E' Panjang = 1.000 M1


Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 0.400 M2

As E'' Panjang = 1.800 M1


Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 0.720 M2

As F Panjang = 6.600 M1
Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 2.640 M2

Toilet Pria Panjang = 7.850 M1


Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 3.140 M2

Toilet Wanita Panjang = 8.850 M1


Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 3.540 M2

Toilet 2 Panjang = 8.620 M1


Tinggi = 0.200 M1
Unit = 2.000 M1
Volume = 3.448 M2

Dibawah Kaca Depan kiri dan kanan Panjang = 18.300 M1


Tinggi = 0.150 M1
Sisi = 2.000 M1
Unit = 4.000
Volume = 21.960 M2

Dibawah Kaca Belakang kiri dan kanan Panjang = 7.630 M1


Tinggi = 0.150 M1
Sisi = 2.000 M1
Unit = 4.000
Volume = 9.156 M2

Volume = 67.576 M2 67.576 M2


Total Panjang = 84.03

244.0 Besi Kg 633.881 Kg


I Pas. Profil Beton 10 cm M'
SUB TOTAL I A1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

2 PEKERJAAN PLAFOND & PARTISI


A PEKERJAAN PLAFOND
1. Pas. Rangka Plafond PVC M2
1 Panjang = 7.650 M1
Lebar = 3.250 M1
Volume = 24.863 M2
2 Panjang = 7.350 M1
Lebar = 0.600 M1
Volume = 4.410 M2
3 Panjang = 7.350 M1
Lebar = 3.270 M1
Volume = 24.035 M2
4 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
5 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
6 Panjang = 14.170 M1
Lebar = 5.900 M1
Volume = 83.603 M2
7 Panjang = 7.050 M1
Lebar = 6.070 M1
Volume = 42.794 M2
8 Panjang = 1.650 M1
Lebar = 1.650 M1
Volume = 2.723 M2
9 Panjang = 1.650 M1
Lebar = 1.650 M1
Volume = 2.723 M2
10 Panjang = 3.800 M1
Lebar = 3.570 M1
Volume = 13.566 M2
11 Panjang = 4.100 M1
Lebar = 3.070 M1
Volume = 12.587 M2
12 Panjang = 3.250 M1
Lebar = 6.250 M1
Volume = 20.313 M2
13 Panjang = 3.450 M1
Lebar = 6.250 M1
Volume = 21.563 M2
14 Panjang = 10.800 M1
Lebar = 1.800 M1
Volume = 19.440 M2
15 Panjang = 3.450 M1
Lebar = 3.450 M1
Volume = 11.903 M2
16 Panjang = 1.500 M1
Lebar = 2.800 M1
Volume = 4.200 M2
17 Panjang = 1.800 M1
Lebar = 2.650 M1
Volume = 4.770 M2
18 Panjang = 3.370 M1
Lebar = 3.700 M1
Volume = 12.469 M2
19 Panjang = 3.300 M1
Lebar = 1.970 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 6.501 M2
20 Panjang = 2.400 M1
Lebar = 1.000 M1
Volume = 2.400 M2
21 Panjang = 1.400 M1
Lebar = 1.650 M1
Volume = 2.310 M2
22 Panjang = 1.650 M1
Lebar = 3.600 M1
Volume = 5.940 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

23 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
24 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
25 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
26 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
27 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
28 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
29 Panjang = 1.400 M1
Lebar = 0.900 M1
Volume = 1.260 M2
30 Panjang = 3.290 M1
Lebar = 1.650 M1
Volume = 5.429 M2
31 Panjang = 2.400 M1
Lebar = 1.000 M1
Volume = 2.400 M2
32 Panjang = 2.400 M1
Lebar = 1.650 M1
Volume = 3.960 M2
33 Panjang = 1.650 M1
Lebar = 3.600 M1
Volume = 5.940 M2
34 Panjang = 3.750 M1
Lebar = 3.120 M1
Volume = 11.700 M2
35 Panjang = 3.450 M1
Lebar = 3.350 M1
Volume = 11.558 M2
36 Panjang = 3.500 M1
Lebar = 1.300 M1
Volume = 4.550 M2
37 Panjang = 7.050 M1
Lebar = 6.070 M1
Volume = 42.794 M2
38 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
39 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
40 Panjang = 7.350 M1
Lebar = 3.270 M1
Volume = 24.035 M2
41 Panjang = 7.350 M1
Lebar = 0.600 M1
Volume = 4.410 M2
42 Panjang = 7.650 M1
Lebar = 3.250 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 24.863 M2
43 Panjang = 18.300 M1
Lebar = 0.300 M1
Unit = 2.000
Volume = 10.98 M2
44 Panjang = 7.650 M1
Lebar = 0.300 M1
Unit = 2.000
Volume = 4.59 M2

Total Luas = 498.571 M2 498.571 M2


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

2. Pas. Plafond PVC M² = 498.571 M2


3. Pas. Waterproofing Din. Toilet M² =

a Panjang = 8.050 M1
Lebar = 6.970 M1
Volume = 56.109 M2

b Panjang = 3.450 M1
Lebar = 1.650 M1
Volume = 5.693 M2

Volume = 61.801 M2 61.801 M2

B PEEKRJAAN PARTISI
Pekerjaan Rangka Partisi a Panjang = 3.300 M1
Lebar = 3.000 M1
Unit = 2.000
Volume = 19.800 M2

b Panjang = 1.300 M1
Lebar = 3.000 M1
Unit = 1.000
Volume = 3.900 M2

c Panjang = 1.725 M1
Lebar = 3.000 M1
Unit = 3.000
Volume = 15.525 M2

d Panjang = 2.400 M1
Lebar = 3.000 M1
Unit = 3.000
Volume = 21.600 M2

Volume = 60.825 M2 60.825 M2

Pekerjaan Dinding Partisi Luas = 60.825


Kali 2 = 2.000
Volume = 121.650 M2 121.650 M2

Cor Lantai

A Panjang = 7.500 M1
Lebar = 7.200 M1
Tebal = 3.000
Volume = 162.000 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

3 PEKERJAAN LANTAI
1 Pas. Lantai Beton K-125 M³
2 Pas. Lantai Granite Homogeneus uk 60x60 M²
3 Pas. Motif Centre Panel Uk. 1.20 x 1.20 cm Unit
4 Pas. Lt Keramik 40x40 Kw 1 Non Polish (ENT) M²
A/G Panjang = 25.200 M1
Lebar = 1.550 M1
Luas = 39.060 M2

B/F Panjang = 7.500 M1


Lebar = 1.450 M1
Luas = 10.875 M2

C/E Panjang = 8.650 M1


Lebar = 1.550 M1
Luas = 13.408 M2

D Panjang = 11.000 M1
Lebar = 1.700 M1
Luas = 18.700 M2

H Panjang = 29.100 M1
Lebar = 1.450 M1
Luas = 42.195 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

I Panjang = 14.700 M1
Lebar = 1.450 M1
Luas = 21.315 M2

Total Luas = 145.553 M2 145.553 M2


5 Pas. Plint Granit 10 x 60 cm M'
6 Pas. Lantai Granite Homogeneus (Tangga Ent) M²
7 Pas. Stair Noshing Granit 10 x 60 cm (Tangga Ent) M'
8 Pek. Finish Tangga Type 1
Afwerking Bidang Beton M²
Finish Cat Tembok (Interior) M²
Pas. Railling Tangga Besi + Cat Duco M'
SUB TOTAL 3

4 PEKERJAAN PINTU / JENDELA


TYPE ALUMINIUM

1 Pas. PD-1 / Framelles Tb 12 MM Produk Ashimas Unit


Uk. 90 x 240 dengan 2 Daun
2 Pas. Curtain Wall Tb 10 MM Tempered Produk Asahimas M² Panjang = 18.3 M1
tb 10 mm ex. Asahimas . Clear Tinggi = 2.9 M1
Unit = 2 M1
Luas = 106.14 M2

Panjang = 7.63 M1
Tinggi = 2.9 M1
Unit = 2
Luas = 44.254 M2

Panjang = 1.6 M1
Tinggi = 3 M1
Unit = 2
Luas = 9.6 M2

Panjang = 0.95 M1
Tinggi = 3.4 M1
Unit = 2
Luas = 6.46 M2

Panjang = 2.3 M1
Tinggi = 0.4 M1
Unit = 2
Luas = 1.84 M2

Luas Total = 168.294 M2

3 Pas. Sandblast M²

4 Pas. Curtain Wall Tb 8 MM Tempered Produk Asahimas M²


Kaca Stopsol refletive super blue green
tb 8 mm ex. Asahimas U Chanel 0.8 mm

5 Pas. PD2 AC Unit


6 Pek. Pas. Panel ACP Tb 4 mm Ekterior ex SEVEN M²
Diatas Kaca Panjang = 18.3 M1

Tinggi = 0.35 M1
Unit = 2
Luas = 12.81 M2

Dibawah Kaca Panjang = 18.3 M1

Tinggi = 0.65 M1
Unit = 2
Luas = 23.79 M2

Diatas Kaca Panjang = 7.63 M1

Tinggi = 0.35 M1
Unit = 2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Luas = 5.341 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Dibawah Kaca Panjang = 7.63 M1

Tinggi = 0.65 M1
Unit = 2
Luas = 9.919 M2

Pintu Utama Panjang = 4.6 M1

Lebar = 0.8 M1
Unit = 2
Luas = 7.36 M2

Panjang = 2.4 M1

Lebar = 0.6 M1
Unit = 2
Luas = 2.88 M2

Luas Total = 62.1 M2 62.1 M2

1 Pas. Kusen Teralis Besi + Finish Cat M²


2 Pas. Kusen / Pintu Type PA. 02 Unit
4 Pas. Kusen / Pintu Type PA, 03 (Toilet) Unit
5 Pas. Kusen / Jendela Type PJ-1 AC Unit
6 Pas. Kusen / Jendela Type PJ -2 AC Unit
8 Pas. Kusen / Jendela Type JA - 2 AC Unit
9 Pas. kusen / Pintu Type PB.1 (P. Besi Plat + P. Teralis ) Unit
10. Pas. Kusen Type BV -1 Unit
11. Pas. Kusen Type BV - 2 Unit
12. Pas. Pintu Shaft / P.4 Unit
SUB TOTAL 4
5 PEKERJAAN PENGECATAN
1 Mencat Dinding Ext Cat Dulux Wheatershield M²
As 1 Panjang = 56.18 M1

Tinggi = 3.85 M1

Luas = 216.293 M2 216.293 M2


2 Mencat Dinding Interior M²

Luas Pas Bata 1:2 = 49.12 M2


Luas Pas Bata 1:4 = 192.33 M2
Luas Partisi = 121.65 M2
Luas Afwerking = 283.88 M2

Luas Total = 646.97 M2 646.974 M2

3 Mencat Bid Kayu kelihatan 3 x Lapis M²


SUB TOTAL II 5
6 PEKERJAAN TOILET DAN KM/WC
1 Pas. Keramik Dinding 20 x 40 Kw I M²
Toilet 1 Panjang = 51.64 M1

Tinggi = 2 M1

Luas = 103.28 M2

Toilet 2 Panjang = 10.73 M1

Tinggi = 2 M1

Luas = 21.46 M2 124.74 M2


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

2 Pas. Lt Keramik 40 x 40 Kw 1 Non Polish M²


Toilet 1 21/32 Panjang = 2.4 M1

Lebar = 1.65 M1
Unit = 2
Luas = 7.92 M2

22/33 Panjang = 3.6 M1

Lebar = 1.65 M1
Unit = 2
Luas = 11.88 M2

23/24/25/26 Panjang = 1.05 M1


27/28 Lebar = 1.65 M1
Unit = 6
Luas = 10.395 M2

Toilet 2 Panjang = 1.65 M1

Lebar = 1.65 M1
Unit = 2
Luas = 5.445 M2

Luas Total = 35.64 M2 35.64 M2

3 Pas. Listello Uk. 10 x 40 M²


Panjang = 62.37 M1 62.37 M1

4 Pas. Water Proofing Lantai & Dinding Toilet M² Luas = 124.74 M1 124.74 M1

PEKERJAAN SANITARY FIXTURES


1. Closet Duduk ex. TOTO CW 421 J Unit
2. Closet Jongkok ex. TOTO CE 9 Unit
3. Jet Washer ex. TOTO Unit
4. Kran Air 3/4" ex TOTO T 23 B13 Unit
5. Urinoir Type ex TOTO U 57 Unit
6. Floor Drain ex TOTO Unit
7. Tower Ring TS 115 SB Unit
8. Raper Holder TS 116 R Unit
SUB TOTAL II 6

II PEKERJAAN ARSITEKTUR LANTAI II


1 PEKERJAAN DINDING
a Pas. Dinding Batu Bata 1 : 2 M²
As 1 dan As 9 Panjang = 13.840 M1
Tinggi = 0.800 M1
Unit = 2.000
Volume = 22.144 M2

As 2 Panjang = 1.300 M1
Tinggi = 0.800 M1
Volume = 1.040 M2

As 3 Panjang = 11.540 M1
Tinggi = 0.800 M1
Volume = 9.232 M2

As 3' Panjang = 1.500 M1


Tinggi = 0.800 M1
Volume = 1.200 M2

As 4 Panjang = 5.640 M1
Tinggi = 0.800 M1
Volume = 4.512 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As 5 Panjang = 5.770 M1
Tinggi = 0.800 M1
Volume = 4.616 M2

As 6 Panjang = 5.770 M1
Tinggi = 0.800 M1
Volume = 4.616 M2

As 7 Panjang = 9.840 M1
Tinggi = 0.800 M1
Volume = 7.872 M2

As 8 Panjang = 6.940 M1
Tinggi = 0.800 M1
Volume = 5.552 M2

As B Panjang = 13.980 M1
Tinggi = 0.800 M1
Volume = 11.184 M2

As B' Panjang = 2.600 M1


Tinggi = 0.800 M1
Volume = 2.080 M2

As C Panjang = 6.340 M1
Tinggi = 0.800 M1
Volume = 5.072 M2

As D Panjang = 10.020 M1
Tinggi = 0.800 M1
Volume = 8.016 M2

As D1 Panjang = 2.700 M1
Tinggi = 0.800 M1
Volume = 2.160 M2

As D2 Panjang = 0.900 M1
Tinggi = 0.800 M1
Volume = 0.720 M2

As D3/D4/D5 Panjang = 3.100 M1


Tinggi = 0.800 M1
Unit = 5.000
Volume = 12.400 M2

As E Panjang = 19.800 M1
Tinggi = 0.800 M1
Volume = 15.840 M2

Luas Total = 118.256 M2 118.256 M2

b Pas. Dinding Batu Bata 1 : 4 M²


As 1 dan As 9 Panjang = 13.840 M1
Tinggi = 2.700 M1
Unit = 2.000
Volume = 74.736 M2

As 2 Panjang = 1.300 M1
Tinggi = 2.700 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 3.510 M2

As 3 Panjang = 11.540 M1
Tinggi = 2.700 M1
Volume = 31.158 M2

As 3' Panjang = 1.500 M1


Tinggi = 2.700 M1
Volume = 4.050 M2

As 4 Panjang = 5.640 M1
Tinggi = 2.700 M1
Volume = 15.228 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As 5 Panjang = 5.770 M1
Tinggi = 2.700 M1
Volume = 15.579 M2

As 6 Panjang = 5.770 M1
Tinggi = 2.700 M1
Volume = 15.579 M2

As 7 Panjang = 9.840 M1
Tinggi = 2.700 M1
Volume = 26.568 M2

As 8 Panjang = 6.940 M1
Tinggi = 2.700 M1
Volume = 18.738 M2

As B Panjang = 13.980 M1
Tinggi = 2.700 M1
Volume = 37.746 M2

As B' Panjang = 2.600 M1


Tinggi = 2.700 M1
Volume = 7.020 M2

As C Panjang = 6.340 M1
Tinggi = 2.700 M1
Volume = 17.118 M2

As D Panjang = 10.020 M1
Tinggi = 2.700 M1
Volume = 27.054 M2

As D1 Panjang = 2.700 M1
Tinggi = 2.700 M1
Volume = 7.290 M2

As D2 Panjang = 0.900 M1
Tinggi = 2.700 M1
Volume = 2.430 M2

As D3/D4/D5 Panjang = 3.100 M1


Tinggi = 2.700 M1
Unit = 5.000
Volume = 41.850 M2

As E Panjang = 19.800 M1
Tinggi = 2.700 M1
Volume = 53.460 M2

Luas Total = 399.114 M2 399.114 M2

c Plesteran Dinding 1 : 2 M²
Luas Pas. Bata 118.256
Kali 2 2
236.512 M2 236.512 M2
d Plesteran Dinding 1 : 4 M²
Luas Pas. Bata 399.114
Kali 2 2
798.228 M2 798.228 M2
e Pas. Acian Dinding M²
Plesteran Dinding 1:2 236.512
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Plesteran Dinding 1:4 798.228


Afwerking
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

f Afwerking Bidang Beton M²


As 1 a Lebar = 0.600 M1
Panjang = 1.000 M1
a. c. Tinggi = 3.500 M1
b. Unit = 2.000
Volume = 11.200 M2

b Lebar = 1.040 M1
d. Tinggi = 3.400 M1
e. Unit = 1.000
Volume = 4.440 M2

c&d Lebar = 1.280 M1


Tinggi = 3.400 M1
Unit = 2.000
Volume = 9.360 M2

e Lebar = 0.570 M1
Tinggi = 3.400 M1
Unit = 1.000
Volume = 3.970 M2

As 2
a Lebar = 1.440 M1

a. Tinggi = 3.500 M1
Volume = 5.040 M2

d. b Lebar = 1.580 M1
Tinggi = 3.500 M1
b. Volume = 5.530 M2

c Lebar = 1.120 M1
Tinggi = 3.500 M1
Volume = 3.920 M2
c.
d Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000
a. Volume = 11.200 M2

d.
As 3 a Lebar = 1.120 M1
Tinggi = 3.500 M1
Volume = 3.920 M2

b Lebar = 1.450 M1
b. Tinggi = 3.500 M1

e. Volume = 5.075 M2

c Lebar = 1.450 M1
Tinggi = 3.500 M1
Volume = 5.075 M2

c. f. d Lebar = 1.300 M1
Tinggi = 3.500 M1
Volume = 4.550 M2

e Lebar = 0.700 M1
Tinggi = 3.500 M1
Volume = 2.450 M2

f Lebar = 1.600 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Tinggi = 3.500 M1
Volume = 5.600 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As 4 a Lebar = 1.150 M1
Tinggi = 3.500 M1
a. Volume = 4.025 M2

b Lebar = 1.450 M1
Tinggi = 3.500 M1

b. Volume = 5.075 M2

c Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1

c.
Unit = 2.000
Volume = 11.200 M2

As 5 a Lebar = 1.150 M1
Tinggi = 3.500 M1

a. Volume = 4.025 M2

b Lebar = 1.450 M1
Tinggi = 3.500 M1
Volume = 5.075 M2

c Lebar = 0.600 M1
Panjang = 1.000 M1

b. Tinggi
Unit
=
=
3.500
2.000
M1

Volume = 11.200 M2

d Lebar = 1.200 M1
Tinggi = 3.500 M1
Volume = 4.200 M2
c.

d.

As. 6 a Lebar = 1.150 M1


Tinggi = 3.500 M1
a. Volume = 4.025 M2

b Lebar = 1.450 M1
Tinggi = 3.500 M1

b. Volume = 5.075 M2

c Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000
c. Volume = 11.200 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

As 7 a Lebar = 1.150 M1
Tinggi = 3.500 M1
a. d. Volume = 4.025 M2

b Lebar = 1.150 M1
Tinggi = 3.500 M1
Volume = 4.025 M2

b. e. c Lebar = 1.450 M1
Tinggi = 3.500 M1
Volume = 5.075 M2

c. d Lebar
Tinggi
=
=
1.300
3.500
M1
M1
Volume = 4.550 M2

e Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000
Volume = 11.200 M2

a. As 8 a Lebar = 1.300 M1
Tinggi = 3.500 M1
Volume = 4.550 M2

b Lebar = 1.300 M1

b. Tinggi = 3.500 M1
Volume = 4.550 M2

c Lebar = 1.300 M1
Tinggi = 3.500 M1
Volume = 4.550 M2

c. d Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1
Unit = 2.000

d. Volume = 11.200 M2

As 9 a Lebar = 0.600 M1
Panjang = 1.000 M1
Tinggi = 3.500 M1

a. Unit = 2.000

d. Volume = 11.200 M2

b Lebar = 1.300 M1
Tinggi = 3.500 M1

b. Volume = 4.550 M2

e. c Lebar = 1.300 M1
Tinggi = 3.500 M1
Volume = 4.550 M2

c. d Lebar = 1.450 M1
e.

NO
c. SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Tinggi = 3.500 M1
Volume = 5.075 M2

e Lebar = 0.700 M1
Tinggi = 3.500 M1
Volume = 2.450 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Balok Sekeliling
As 1 Panjang = 14.300 M1
Tinggi = 0.540 M1
Volume = 7.722 M2
As 11
Panjang = 2.700 M1
Tinggi = 0.930 M1
Volume = 2.511 M2

As 3 Panjang = 6.700 M1
Tinggi = 0.930 M1
Volume = 6.231 M2

As 7 Panjang = 6.700 M1
Tinggi = 0.930 M1
Volume = 6.231 M2

As 9 Panjang = 14.300 M1
Tinggi = 0.540 M1
Volume = 7.722 M2
As 91
Panjang = 2.700 M1
Tinggi = 0.930 M1
Volume = 2.511 M2
As A
Panjang = 6.600 M1
Tinggi = 0.930 M1
Unit = 2.000
Volume = 12.276 M2
As F
Panjang = 19.800 M1
Tinggi = 0.540 M1
Volume = 10.692 M2

Volume Total = 283.88 M2 283.88 M2

g Pas. Batu Alam uk. 20x40 tb 15 M²


Lebar = 1.200 M1
Tinggi = 4.300 M1
Unit = 2.000
Volume = 10.320 M2 10.32 M2

h Pas. Balok Lathe / Blk Praktis


1.0 Beton K-225 M³
13.3 Begisting M²
244.0 Besi Kg
SUB TOTAL 1

2 PEKERJAAN PLAFOND & PARTISI


A PEKERJAAN PLAFOND
1. Pas. Rangka Plafond PVC M²
1 Panjang = 7.650 M1
Lebar = 3.250 M1
Volume = 24.863 M2
2 Panjang = 7.350 M1
Lebar = 0.600 M1
Volume = 4.410 M2
3 Panjang = 7.350 M1
Lebar = 3.270 M1
Volume = 24.035 M2
4 Panjang = 3.300 M1
Lebar = 0.500 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 1.650 M2
5 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
6 Panjang = 14.170 M1
Lebar = 5.900 M1
Volume = 83.603 M2
7 Panjang = 7.050 M1
Lebar = 6.070 M1
Volume = 42.794 M2
8 Panjang = 1.650 M1
Lebar = 1.650 M1
Volume = 2.723 M2
9 Panjang = 1.650 M1
Lebar = 1.650 M1
Volume = 2.723 M2
10 Panjang = 3.800 M1
Lebar = 3.570 M1
Volume = 13.566 M2
11 Panjang = 4.100 M1
Lebar = 3.070 M1
Volume = 12.587 M2
12 Panjang = 3.250 M1
Lebar = 6.250 M1
Volume = 20.313 M2
13 Panjang = 3.450 M1
Lebar = 3.450 M1
Volume = 11.903 M2
14 Panjang = 10.800 M1
Lebar = 1.800 M1
Volume = 19.440 M2
15 Panjang = 3.450 M1
Lebar = 3.750 M1
Volume = 12.938 M2
16 Panjang = 3.450 M1
Lebar = 6.250 M1
Volume = 21.563 M2
17 Panjang = 3.370 M1
Lebar = 3.700 M1
Volume = 12.469 M2
18 Panjang = 3.300 M1
Lebar = 1.970 M1
Volume = 6.501 M2
19 Panjang = 2.400 M1
Lebar = 1.000 M1
Volume = 2.400 M2
20 Panjang = 1.400 M1
Lebar = 1.650 M1
Volume = 2.310 M2
21 Panjang = 1.650 M1
Lebar = 3.600 M1
Volume = 5.940 M2
22 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
23 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
24 Panjang = 1.650 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Lebar = 1.050 M1
Volume = 1.733 M2
25 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
26 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
27 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
28 Panjang = 1.400 M1
Lebar = 0.900 M1
Volume = 1.260 M2
29 Panjang = 3.290 M1
Lebar = 1.650 M1
Volume = 5.429 M2
30 Panjang = 2.400 M1
Lebar = 1.000 M1
Volume = 2.400 M2
31 Panjang = 2.400 M1
Lebar = 1.650 M1
Volume = 3.960 M2
32 Panjang = 1.650 M1
Lebar = 3.600 M1
Volume = 5.940 M2
33 Panjang = 3.750 M1
Lebar = 3.120 M1
Volume = 11.700 M2
34 Panjang = 3.450 M1
Lebar = 3.350 M1
Volume = 11.558 M2
35 Panjang = 3.500 M1
Lebar = 1.300 M1
Volume = 4.550 M2
36 Panjang = 7.050 M1
Lebar = 6.070 M1
Volume = 42.794 M2
37 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
38 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
39 Panjang = 7.350 M1
Lebar = 3.270 M1
Volume = 24.035 M2
40 Panjang = 7.350 M1
Lebar = 0.600 M1
Volume = 4.410 M2
41 Panjang = 7.650 M1
Lebar = 3.250 M1
Volume = 24.863 M2
42 Panjang = 18.300 M1
Lebar = 0.300 M1
Unit = 2.000
Volume = 10.98 M2
42 Panjang = 7.650 M1
Lebar = 0.300 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Unit = 2.000
Volume = 4.59 M2

Total Luas = 502.538 M2 502.538 M2

2. Pas. Plafond PVC M² Luas = 502.538 M2

B PEEKRJAAN PARTISI
1. Pas. Dinding Partisi Tb 6 mm. Ex Gypsum Board M²
a Rangka Partisi = 96.270 M2
Dikali 2 = 2.000 M1
Unit = 1.000
Volume = 192.540 M2

2. Pas. Rangka Dinding Partisi Tb 6 mm M²


a Panjang = 2.950 M1
Lebar = 3.000 M1
Unit = 4.000
Volume = 35.400 M2

b Panjang = 1.950 M1
Lebar = 3.000 M1
Unit = 3.000
Volume = 17.550 M2

c Panjang = 1.725 M1
Lebar = 3.000 M1
Unit = 2.000
Volume = 10.350 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

d Panjang = 3.300 M1
Lebar = 3.000 M1
Unit = 2.000
Volume = 19.800 M2

e Panjang = 4.390 M1
Lebar = 3.000 M1
Unit = 1.000
Volume = 13.170 M2

Volume = 96.270 M2 96.270 M2

3. Pas. Kusen Type BV - 2 Unit


4. Pas. Partisi Type PT.07. AC Unit
SUB TOTAL II A-B

3 PEKERJAAN LANTAI
1.Pas. Lantai Granite Homogeneus uk.60x60 M²
1 Panjang = 7.650 M1
Lebar = 3.250 M1
Volume = 24.863 M2
2 Panjang = 7.350 M1
Lebar = 0.600 M1
Volume = 4.410 M2
3 Panjang = 7.350 M1
Lebar = 3.270 M1
Volume = 24.035 M2
4 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
5 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
6 Panjang = 14.170 M1
Lebar = 5.900 M1
Volume = 83.603 M2
7 Panjang = 7.050 M1
Lebar = 6.070 M1
Volume = 42.794 M2
8 Panjang = 1.650 M1
Lebar = 1.650 M1
Volume = 2.723 M2
9 Panjang = 1.650 M1
Lebar = 1.650 M1
Volume = 2.723 M2
10 Panjang = 3.800 M1
Lebar = 3.570 M1
Volume = 13.566 M2
11 Panjang = 4.100 M1
Lebar = 3.070 M1
Volume = 12.587 M2
12 Panjang = 3.250 M1
Lebar = 6.250 M1
Volume = 20.313 M2
13 Panjang = 3.450 M1
Lebar = 3.450 M1
Volume = 11.903 M2
14 Panjang = 10.800 M1
Lebar = 1.800 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 19.440 M2
15 Panjang = 3.450 M1
Lebar = 3.750 M1
Volume = 12.938 M2
16 Panjang = 3.450 M1
Lebar = 6.250 M1
Volume = 21.563 M2
17 Panjang = 3.370 M1
Lebar = 8.370 M1
Volume = 28.207 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

18 Panjang = 3.300 M1
Lebar = 1.970 M1
Volume = 6.501 M2
19 Panjang = 2.400 M1
Lebar = 1.000 M1
Volume = 2.400 M2
20 Panjang = 1.400 M1
Lebar = 1.650 M1
Volume = 2.310 M2
21 Panjang = 1.650 M1
Lebar = 3.600 M1
Volume = 5.940 M2
22 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
23 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
24 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
25 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
26 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
27 Panjang = 1.650 M1
Lebar = 1.050 M1
Volume = 1.733 M2
28 Panjang = 1.400 M1
Lebar = 0.900 M1
Volume = 1.260 M2
29 Panjang = 3.290 M1
Lebar = 1.650 M1
Volume = 5.429 M2
30 Panjang = 2.400 M1
Lebar = 1.000 M1
Volume = 2.400 M2
31 Panjang = 2.400 M1
Lebar = 1.650 M1
Volume = 3.960 M2
32 Panjang = 1.650 M1
Lebar = 3.600 M1
Volume = 5.940 M2
33 Panjang = 3.750 M1
Lebar = 3.120 M1
Volume = 11.700 M2
34 Panjang = 3.450 M1
Lebar = 3.350 M1
Volume = 11.558 M2
35 Panjang = 3.500 M1
Lebar = 1.300 M1
Volume = 4.550 M2
36 Panjang = 7.050 M1
Lebar = 6.070 M1
Volume = 42.794 M2
37 Panjang = 3.300 M1
Lebar = 0.500 M1
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 1.650 M2
38 Panjang = 3.300 M1
Lebar = 0.500 M1
Volume = 1.650 M2
39 Panjang = 7.350 M1
Lebar = 3.270 M1
Volume = 24.035 M2
40 Panjang = 7.350 M1
Lebar = 0.600 M1
Volume = 4.410 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

41 Panjang = 7.650 M1
Lebar = 3.250 M1
Volume = 24.863 M2
41 Panjang = 10.100 M1
Lebar = 2.000 M1
Volume = 20.200 M2

Total Luas = 522.906 M2 522.906 M2

2.Pas. Motif Centre Panel Uk. 1.20x1.20 cm Unit


SUB TOTAL II-3

4 PEKERJAAN PINTU / JENDELA


TYPE ALLUMUNIUM
1. Pek. Pas. Panel ACP Tb 4 mm Ekterior ex. SEVEN M²
Panjang = 15.65 M1

Tinggi = 5.1 M1

Luas = 79.815 M2

Panjang = 15.7 M1

Lebar Atas = 0.8 M1

Unit = 2
Luas = 25.12 M2

Panjang = 11.15 M1

Lebar Atas = 0.5 M1

Luas = 5.575 M2

Panjang = 11.15 M1

Lebar Atas = 0.2 M1

Luas = 2.23 M2

Dijendela kaca Panjang = 11.15 M1

Lebar Atas = 0.2 M1

Luas = 2.23 M2

Diatas Kaca Panjang = 18.3 M1

Tinggi = 0.35 M1
Unit = 2
Luas = 12.81 M2

Diatas Kaca Panjang = 7.63 M1

Tinggi = 0.35 M1
Unit = 2
Luas = 5.341 M2

Pengurangan Panjang = 6.9 M1

Lebar Atas = 2.95 M1

Luas = 20.355 M2

Luas Total = 110.536 M2 110.536 M2

2. Pas. Curtain Wall TB 8 MM Tempered Produk Asahimas M²


Kaca Stopsol reflective super silver blue green
tb 8 mm ex. Asahimas U Chanel 0.8 mm
Panjang = 6.9 M1

Lebar Atas = 2.95 M1

Luas = 20.355 M2

Luas Total = 20.355 M2 20.355 M2


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

3 Pas. Curtain Wall Tb 10 MM Tempered Produk Asahimas


tb 10 mm ex. Asahimas . Clear
Panjang = 18.3 M1

Tinggi = 3.4 M1

Unit = 2 M1

Luas = 124.44 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Panjang = 7.63 M1

Tinggi = 3.4 M1
Unit = 2
Luas = 51.884 M2

Luas Total = 176.324 M2 176.324 M2

3. Pas. Kusen / Jendela Type PJ-1 AC Unit


4. Pas. Kusen / Jendela Type PJ-2 AC Unit
5. Pas. Kusen / Jendela Type PD- 2 AC Unit
6. Pas. Kusen / Jendela Type JA - 2 AC Unit
8. Pas. Kusen Type PA-2 Unit
9. Pas. Kusen Type BV-1 Unit
10. Pas. Kusen Type BV-2 Unit
11.Pas. Kusen / Pintu Type PA.3 (Toilet) Unit
12. Pas. Pintu Shaft / P.4 Unit
13. Pas. Kusen / Pintu Type PB.1 (P.Besi Plat + P.Teralis) Unit
SUB TOTAL II-4

5 PEKERJAAN PENGECATAN
1. Mencat Dinding Ext. Cat Dulux Wheatershield M²
Pek. Pas. Bata 1 : 2 118.256 M2
Pek. Pas. Bata 1 : 4 399.114 M2
Pek. Afwerking - M2
Balok Sekeliling
As 1 Panjang = 14.300 M1
Tinggi = 0.540 M1
Volume = 7.722 M2
As 11
Panjang = 2.700 M1
Tinggi = 0.930 M1
Volume = 2.511 M2

As 3 Panjang = 6.700 M1
Tinggi = 0.930 M1
Volume = 6.231 M2

As 7 Panjang = 6.700 M1
Tinggi = 0.930 M1
Volume = 6.231 M2

As 9 Panjang = 14.300 M1
Tinggi = 0.540 M1
Volume = 7.722 M2
As 91
Panjang = 2.700 M1
Tinggi = 0.930 M1
Volume = 2.511 M2
As A
Panjang = 6.600 M1
Tinggi = 0.930 M1
Unit = 2.000
Volume = 12.276 M2
As F
Panjang = 19.800 M1
Tinggi = 0.540 M1
Volume = 10.692 M2

Volume Total = 573.27 M2 573.27 M2

2. Mencat Dinding Interior M²


Pek. Pas. Bata 1 : 2 118.256 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Pek. Pas. Bata 1 : 4 399.114 M2


Pek. Afwerking 283.88 M2
Pek. Dinidng Partisi 192.540 M2

993.786 M2 993.786 M2

4. Mencat Bid Kayu 3 x Lapis M²


SUB TOTAL II-5
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

6 PEKERJAAN TOILET DAN KM/WC


1. Pas. Keramik Dinding 20 x 40 Kw I M²
2. Pas. Lt. Keramik 40 x 40 Kw I Non Polish M²
3. Pas. Water Proofing Lantai & Dinding Toilet M²

PEKERJAAN SANITARY FIXTURES


1. Closet Jongkok ex. TOTO CE 9 Unit
2. Closet Duduk ex. TOTO CW 421 J Unit
3. Jet Washer ex. TOTO Unit
4. Kran Air 3/4" ex TOTO T 23 B13 Unit
5. Floor Drain ex TOTO Unit
6. Tower Ring TS 115 SB Unit
7. Raper Holder TS 116 R Unit
8. Pek. Meja Wastafel tb 10 cm Unit

SUB TOTAL II-6

III PEKERJAAN ARSITEKTUR LT PENTHOUSE


A. PEKERJAAN DINDING & LANTAI
1. Pas. Dinding Batu Bata 1:2 M²
Dibawah Atap Samping Panjang = 3.300 M1
Tinggi = 1.835 M1
Unit = 2.000
Volume = 12.111 M2

Panjang = 3.300 M1
Tinggi = 1.525 M1
Unit = 2.000
Volume = 10.065 M2

Panjang = 6.600 M1
Tinggi = 1.340 M1
Unit = 2.000
Volume = 17.688 M2

Panjang = 6.600 M1
Tinggi = 1.150 M1
Unit = 2.000
Volume = 15.180 M2

Dibawah Atap Depan/Belakang Panjang = 7.200 M1


Tinggi = 3.000 M1
Unit = 2.000
Volume = 43.200 M2
Ruang Pompa
Panjang = 5.900 M1
Tinggi = 3.000 M1
Unit = 3.000
Volume = 53.100 M2

Panjang = 3.300 M1
Tinggi = 3.000 M1
Unit = 2.000
Volume = 19.800 M2

Dinding Belakang Panjang = 3.300 M1


Tinggi = 1.500 M1
Unit = 2.000
Volume = 9.900 M2

Dinding Depan Panjang = 17.450 M1


Tinggi = 0.500 M1
Unit = 2.000
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Volume = 17.450 M2

Plang Nama Panjang = 7.200 M1


Tinggi = 2.000 M1
Unit = 1.000
Volume = 14.400 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Pengurangan Pintu Panjang = 1.300 M1


Tinggi = 2.700 M1
Unit = 2.000
Volume = 7.020 M2

Luas Total = 205.874 M2 205.874 M2

2. Plesteran Dinding 1:2 M²


Pas. Dinding = 205.874 M2
Dikali 2 = 2
= 411.75 M2 411.748 M2

3. Pas. Acian Dinding M²


= 411.75 M2 411.748 M2

4. Pas. Dinding GRC tb 4 mm M²

5. Pek. Palfon dan rangka

Panjang = 9.600 M1
Lebar = 0.920 M1
Unit = 2.000
Volume = 17.664 M2

Panjang = 9.600 M1
Lebar = 2.120 M1
Unit = 2.000
Volume = 40.704 M2

Panjang = 21.950 M1
Lebar = 1.120 M1
Unit = 4.000
Volume = 98.336 M2

Ruang Roof Tank dan Tangga Panjang = 6.250 M1


Lebar = 3.450 M1
Unit = 2.000
Volume = 43.125 M2

Luas Total = 199.829 M2 199.829 M2

5. Pas. Lap. Waterproofing Plat Dack M²

A/B Panjang = 4.250 M1


Lebar = 6.800 M1
Unit = 2.000
Volume = 57.800 M2

C Panjang = 15.05 M1

Lebar Atas = 8.22 M1

Luas = 123.711 M2

D Panjang = 12.2 M1

Lebar Atas = 2.42 M1

Luas = 29.524 M2
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

Luas Total = 211.035 M2 211.035 M2


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

6. Pintu Besi M²

B. PEKERJAAN PENGECATAN
1. Mencat Dinding Ext Cat Dulux Wheatershield M²

C. PEKERJAAN LAIN -LAINYA


1. Pek. Pas. Panel ACP Tb.4 mm Ekterior ex SEVEN M²
2. Logo Dinas Pertanian Uk. 1 M Unit
3. Logo PEMDA Kota Solok Uk. 1 M Unit
4. Tulisan "Dinas Pertanian" Letter H: 35 cm Unit
Bahan Steinless Stell
5. Tulisan "Kota Solok" Letter H:50 cm Unit
Bahan Steinless Stell

SUB TOTAL III A-B-C

C PEKERJAAN ELEKTRIKAL DAN MEKANIKAL

I PEKERJAAN ELEKTRIKAL
A Pekerjaan Instalasi Listrik Gedung
a. Penerangan Lantai 1
1 Pas. Instalasi Titik Lampu Ttk
2 Pas. Instalasi Stop Kontak Ttk
3 Pas. Instalasi Stop Kontak AC Ttk
4 Pas. Lampu TBS 318 2 x 16 W LED RM Prismatic M2 Phillips Bh
5 Pas. Lampu Downlights Nickel E27 + LED 13W 6500 K 5" 220V ex. Phillips Bh
6 Pas. Lampu Downligths Slimit 59724 LED 13 W 6500K 5" 220V ex. Phillips Bh
7 Pas. Lampu Downligths Esscus Led Spot 7W 4000K 220V ex Phillips Bh
8 Pas. Lampu Ceiling WHT 331815 LED 17 W ex. Phillips Bh
9 Lampu Exit 10W PHILIPS (termasuk Emergency c/w Battery Nicad 20W) ex Ph Bh
10 Pas. Sakelar Tunggal 10A 1 Phasa type hotel vivace by Schneider Bh
11 Pas. Sakelar Ganda 10A, 1 Phasa type hotel Vivace by schneider Bh
12 Pas. Stop Kontak 16A, Phasa Vivace by Schneider Bh
13 Pas. Stop Kontak AC 16A, 1 Phasa Vivace by Schneider Bh
14 Pas. Stop Kontak Lantai 10 a, 1 Phasa Bh
14 Pas. Gridswitch 6 Gang Bh
Penerangan Lantai 1

b. Penerangan Lantai 2
1 Pas. Instalasi Titik Lampu Ttk
2 Pas. Instalasi Stop Kontak Ttk
3 Pas. Instalasi Stop Kontak Ttk
4 Pas. Lampu TBS 318 2 x 16W LED RM Prismatic M2 Philips Bh
5 Pas. Lampu Downligths Nickel E27 + LED 13 W 6500 K 5"220V ex Phillips Bh
6 Pas. Lampu Downligths Slimlif 59724 LED 13W 6500K 5" 220V ex. Philips Bh
7 Pas. Lampu Downligths Esscus Led spot 7 W4000K 220V ex. Phillips Bh
8 Lampu Exit 10 W PHILIPS (termasuk Emergency c/w Battery Nicad 20W) ex. Philips Bh
9 Pas. Sakelar Tunggal 10A, 1 Phasa type hotel Vivace by schneider Bh
10 Pas. Sakelar Ganda 10A 1Phasa type hotel Vivace By schneider Bh
11 Pas. Stop Kontak 16A, 1 Phasa Vivace by Schneider Bh
12 Pas. Stop Kontak AC 16A, 1 Phasa Vivace by schneider Bh
13 Pas. Stop Kontak Lantai 10A, 1 Phasa Bh
14 Pas. Gridswitch 6 Gang Bh
Penerangan Lantai 2

Sub total Pekerjaan Instalasi Listrik Gedung

B. Pek. CCTV
a. Peralatan Utama CCTV
1 Recorder 32 ch 1 x 2 TB 16 Poe DDN - 3532-212 N16 Unit
2 HDD 2 TB WD PURPLE Unit
3 UPS For Backup Power 2 KVA ICA Unit
4 Wall Mount Bracket NEZ-A4-WW Bh
5 Pas. TV LED Monitor 32" Color + Bricket Unit
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

b.Instalasi CCTV Lantai 1


1 Pas. Instalasi CCTV CAT 6e Ttk
2 Indoor Dome Camera NUC-21012-F2 Unit
3 PSU For Camera 12 V 10 V Unit

b.Instalasi CCTV Lantai 2


1 Pas. Instalasi CCTV CAT 6e Ttk
2 Indoor Dome Camera NUC-21012-F2 Unit
3 PSU For Camera 12 V 10 V Unit

Sub Total Pekerjaan CCTV

C. Pek. Perlengkapan Utama / Equement


a. Kabel Feeder
1 Pas. Kbl dr Meteran PLN ke MDP Gedung NYY 4x50 mm NYY 1 x35 mm M'
2 Pas. Kbl dr MDP ke SDP. Pompa booster rooftank NYY 4x4 mm M'
3 Pas. Kbl dr MDP ke SDP. Pompa Panel Pompa Sumur Bor NYY 4x6 mm M'

a. Kabel Power Lantai 1


1 Pas. Kbl dr MDP Gedung ke SDP.1 NYY 4x10 mm NYY 1 x 16 mm M'
2 Pas. Kbl dr SDP.1 Gedung ke PP.1 NYY 4x6 mm NYY1 x 16 mm M'
3 Pas. Kbl dr SDP.1 Gedung ke PP.2 NYY 4x6 mm NYY 1 x 16 mm M'

c. Kabel Power Lantai 2


1 Pas. Kbl dr MDP Gedung ke SDP.2 NYY 4x16 mm NYY 1 x 16 mm M1

Sub Total Pekerjaan Perlengkapan Utama/Equement

D. Pek. Panel Power


a. Panel Panel Listrik
1 Pek. Panel MDP Gedung Lantai 1 Unit
2 Pek. Panel Penerangan PP Lantai 1 Unit
3 Pek. Panel Penerangan PP Lantai 2 Unit

Sub Total Pekerjaan Panel

E Pek. Penangkal Petir


1 Radius Proteksi 150 M (Non Konvensional)
1 Pas. Air Terminal Radius Proteksi 150 M Ttk
3 Inst. Obstruction lamp (NYM 3 x 2.5 mm2) ke PP-AC atap bh
4 Down Conductor Cable NYY 1 x 70 mm2 M'
5 Pas. Instalasi grounding (minimal kedalaman 6 m dengan tahanan Ttk
pemburnian = 1 Ohm )
6 Copper rod diameter 5/8" Unit
7 Pek. Tower Tree Eangle Penangkal Petir t = 12 M Ls
Sub Total Penangkal Petir

II PEKERJAAN MEKANIKAL

A Pek. Instalasi Air Bersih


1 a. Peralatan Instalasi Air Bersih Roof Tank bh
1 Pas. Gate Valve Æ 2 ½ / 65 mm (Bronze) bh
2 Pas. Check Valve Æ 2 ½ 65 mm (Bronze) bh
3 Pas. Flexible Sizs Æ 2 ½ 65mm bh
4 Pas. Y strainer Æ 2½ 65mm (Bronze) bh
5 Pas. Pressure Gauge Cap 0-15 kg/ cm² bh
6 Pas. Water Level control untuk pompa trasfer bh
7 Pas. Air Release air Valve (ARV) dia 25 mm bh
8 Pas. Stop Kran Æ ½ " bh
9 Pas. Ball Valve Æ ½" bh
10 Pas. Pipa Header Gift Æ 4" m'
11 Pas. Instalasi Pipa Riser Dalam Shap PPR PN - 10 Dia. 50 mm Booster m'
12 Pek. Pemipahan instalasi pompa Pipa Drain PVC Valve PVC Tangga dan Pen Ls
Instalasi Air Bersih Rooftank

b. Tangki Rooftank
1 Roof Tank FRP Panel Kapasitas 6 M3 Set
Lengkap dengan dudukan pondasi dan pipa over
NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

flow dan sistem drain Termasuk tangga pengontrol


NO SKETSA SATUAN PERHITUNGAN VOLUME Volume STN

c. Instalasi Air Bersih Pipa PPR Klas PN -10 Lantai 1


(termasuk Accessories & Support)
1 Pas. Pipa PPR PN - 10 Dia. 50 mm M'
2 Pas. Pipa PPR PN - 10 Dia. 32 mm M'
3 Pas. Pipa PPR PN - 10 Dia. 25 mm M'
4 Pas. Pipa PPR PN - 10 Dia. 20 mm M'
5 Gate Valve Æ 1/32 mm (Bronze) Bh

d. Instalasi Air Bersih PPR Klas PN 10 Lantai 2


termasuk Accessories & Support)
1 Pas. Pipa PPR PN -10 Dia 50 mm M'
2 Pas. Pipa PPR PN -10 Dia 32 mm M'
3 Pas. Pipa PPR PN - 10 Dia 25 mm M'
4 Pas. Pipa PPR PN - 10 Dia 20 mm M'
5 Gate Valve Æ 1/32 mm (Bronze) Bh

Sub Total Pekerjaan Instalasi Air Bersih

B Pek. Instalasi Air Bekas, Kotor dan Hujan


a. Instalasi Air Bekas & Kotor Lantai 1
1 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Bekas M'
2 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Kotor M'
3 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Bekas M'
4 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Kotor M'
5 Pas. Instalasi Pipa PVC Kls AW Æ 2" Air Bekas M'
6 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/2" Venting M'
7 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/4" Venting M'
8 Pas. Clean Out diameter 100 Bh
9 Pas. Bok Kontrol 600x600x600 mm + Penutup atas Besi Tempa / Cor M'

b. Instalasi Air Bekas & Kotor Lantai 2


1 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Bekas M'
2 Pas. Instalasi Pipa PVC Kls AW Æ 6" Air Kotor M'
3 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Bekas M'
4 Pas. Instalasi Pipa PVC Kls AW Æ 4" Air Kotor M'
5 Pas. Instalasi Pipa PVC Kls AW Æ 2" Air Bekas M'
6 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/2" Venting M'
7 Pas. Instalasi Pipa PVC Kls AW Æ 1 1/4" Venting M'
8 Pas. Clean Out diameter 100 Bh

c. Instalasi Air Hujan


1 Pas. Intalasi Pipa PVC Kls AW Æ 6" Air Hujan Dalam Tanah M'
2 Pas. Intalasi Pipa PVC Kls AW Æ 4" Air Kotor M'
Roof Drain Besi Tempa Æ 4" / 100 MM Bh

Sub Total Pekerjaan Instalasi Air Kotor

D Trunking Cable
a. Pek. Kabel Tray Lantai 1
1 Pas. Kabel Ladder Elektrikal 400 x 100 mm M'
2 Pas. Kabel Ladder Elektrikal 300 x 100 mm M'

b. Pek. Kabel Tray Lantai 2


1 Pas. Kabel Ladder Elektrikal 400 x 100 mm M'
2 Pas. Kabel Ladder Elektrikal 300 x 100 mm M'

Sub Total Pekerjaan Trunking Cable

F Fire Extinguisher (Racun Api)


a. Racun Api Lantai 1
1 FE, Tipe ABC Dry Chemical Kapasitas 6 kg Unit

a. Racun Api Lantai 1


1 FE, Tipe ABC Dry Chemical Kapasitas 6 kg Unit

Sub Total Pekerjaan Fire Extinguisher (Racun Api)


PERHITUNGAN VOLUME PEMBESIAN

PEKERJAAN : LANJUTKAN PEMBANGUNAN KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK

URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
PEKERJAAN STRUKTUR LANTAI -I
1 Pembesian Kolom 15/23 (KP.1.1)
a 13 1.042 0.10 3.50 3.60 4 15.01
a Tulangan Utama
b 10 0.617 0.10 0.19 0.11 0.19 0.11 0.70 18 7.77

Stek c 13 1.042 0.40 0.40 8 3.33

VOLUME TOTAL 26.11


Dikali 4 104.45

b Begel

2 Pembesian Pet
a
Type 1 a 13 1.042 0.10 0.66 0.13 0.89 13 12.06

b 10 0.617 0.10 1.76 1.86 5 5.74


VOLUME TOTAL 17.79
b Dikali 2 47.06

Type 2 a 13 1.042 0.10 0.66 0.13 0.89 16 14.84

b 10 0.617 0.10 2.26 2.36 5 7.28


VOLUME TOTAL 22.12
Dikali 3 88.18

Type 3 a 10 0.617 0.10 0.66 0.13 0.89 15 8.23

b 10 0.617 0.10 2.06 2.16 5 6.66


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
VOLUME TOTAL 14.89
Dikali 1 21.55
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
Type 4 a 10 0.617 0.10 0.66 0.13 0.89 23 12.62

b 10 0.617 0.10 3.26 3.36 5 10.36


VOLUME TOTAL 22.98
Dikali 2 66.69
VOLUME TOTAL 223.48

2 Pembesian Kolom Pintu Utama


Tulangan Utama Datar a 13 1.042 0.10 2.16 2.26 4 9.42
a Tul. Utama
Tulangan Utama Tegak b 13 1.042 0.10 2.56 2.66 8 22.18

Begel c 8 0.395 0.10 0.16 0.16 0.16 0.16 0.74 67 19.57

Stek d 13 1.042 0.40 0.40 8 3.33

VOLUME TOTAL 54.50


b Tul. Utama DIKALI 2 109.00

c Begel

3 Pembesian Kolom Samping Batu Alam

a a 13 1.042 0.10 3.50 3.60 6 22.51

b 8 0.395 0.10 0.11 0.11 0.46 0.46 1.24 19 9.05

c 8 0.395 0.10 0.11 0.11 0.46 0.46 1.24 13 6.20


b Sengkang Tumpuan
stek d 13 1.042 0.40 0.40 12 5.00

VOLUME TOTAL 42.77


Dikali 2 85.53

c Sengkang Lapangan
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
4 Pembesian Kolom praktis 10/15 (KP.1.4)

a. Tul. Utama a 10 0.617 0.10 3.50 3.60 4 8.88

b 8 0.395 0.10 0.09 0.09 0.09 0.09 0.46 18 3.27

stek c 10 0.617 0.50 0.50 8 2.47

VOLUME TOTAL 14.61


b. Begel Dikalo 29 423.82

5 Pembesian Kolom praktis 10/15 (KP.1.5)

a. Tul. Utama a 10 0.617 0.10 2.80 2.90 4 7.15

b 8 0.395 0.10 0.09 0.10 0.09 0.10 0.48 18 3.41

stek c 10 0.617 0.50 0.50 8 2.47

VOLUME TOTAL 13.03


b. Begel Dikalo 26 338.78

6 Pembesian Balok praktis 10/15 (KP.1.6)

a. Tul. Utama a 10 0.617 0.10 2.00 2.10 4 5.18

b 8 0.395 0.10 0.09 0.10 0.09 0.10 0.48 13 2.46

VOLUME TOTAL 7.64


b. Begel Dikalo 3 22.93

7 Pembesian Pondasi Plat setempat 60/60

a. Tul. Utama a 16 1.579 0.10 0.76 0.22 0.76 0.22 2.06 6 19.51

b 16 1.579 0.10 0.76 0.22 0.76 0.22 2.06 6 19.51

VOLUME TOTAL 39.02


Dikalo 3 117.07

8 Pembesian Kolom 30/30


a. Tul. Utama a 16 1.579 0.10 0.25 4.75 5.10 8 64.41

b 10 0.617 0.10 0.26 0.26 0.26 0.26 1.14 30 21.32

VOLUME TOTAL 85.73


Dikalo 3 257.20
PEKERJAAN STRUKTUR LANTAI -II
1 Pek. Balok B-22 25x35
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )

a. Tul. Utama a 16 1.579 0.10 0.30 7.45 7.85 4 49.57

b 16 1.579 0.10 0.30 1.36 1.76 1 2.78

c 16 1.579 0.10 2.35 2.45 1 3.87

d 16 1.579 0.10 2.45 2.55 1 4.03

e 16 1.579 0.10 2.35 2.45 1 3.87

f 16 1.579 0.10 1.08 1.18 1 1.86

g 10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 70 49.21

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 29 20.11

B. Begel VOLUME TOTAL 135.29


Dikali 12 1,623.46

2 Pek. Balok B-1.2 25x40

a Tul. Utama a 16 1.579 0.20 0.35 3.86 0.35 4.76 5 37.57

b 13 1.042 0.20 3.86 4.06 2 8.46

b Tul. Utama c 10 0.617 0.10 0.21 0.36 0.21 0.36 1.24 23 17.59

10 0.617 0.10 0.21 0.36 0.21 0.36 1.24 12 9.18

VOLUME TOTAL 72.80


Dikali 2 145.60

c Tulangan Extra

d Sengkang
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )

3 Pek. Balok B-2.1 & B-2.3 30x40


AS. 1 dan As. 9 a 16 1.579 0.20 0.35 22.26 0.35 23.16 4 146.25

Overlop b 16 1.579 1.20 1.20 4 7.58

c 16 1.579 0.20 0.35 2.41 2.96 2 9.35

d 16 1.579 0.20 4.05 4.25 1 6.71

e 16 1.579 0.20 4.15 4.35 1 6.87

f 16 1.579 0.20 3.65 3.85 1 6.08

g 16 1.579 0.20 5.75 5.95 1 9.39

h 16 1.579 0.20 3.65 3.85 1 6.08

i 13 1.042 0.20 22.26 22.46 2 46.81

Overlop j 13 1.042 1.20 1.20 2 2.50

k 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 23 38.67

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 23 19.28

l 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 34.27

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.08

m 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 10 7.99

n 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 34.27

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.08

VOLUME TOTAL 416.24


DIKALI 2 832.48

As. 3 dan As. 7 a 16 1.579 0.20 0.35 23.70 0.35 24.60 4 155.34

Overlop b 16 1.579 1.20 1.20 4 7.58

c 16 1.579 0.20 0.35 2.41 2.96 1 4.67

d 16 1.579 0.20 4.05 4.25 1 6.71

e 16 1.579 0.20 4.15 4.35 1 6.87

f 16 1.579 0.20 3.65 3.85 1 6.08

g 16 1.579 0.20 5.75 5.95 1 9.39


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
h 16 1.579 0.20 3.65 3.85 1 6.08

i 16 1.579 0.20 3.61 3.81 1 6.01

j 13 1.042 0.20 23.70 23.90 2 49.82

Overlop k 13 1.042 1.20 1.20 2 2.50

l 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 23 38.67

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 23 19.28

m 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 34.27

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.08

n 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 10 7.99

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 34.27

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.08

10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 8 6.89

VOLUME TOTAL 436.56


DIKALI 2 873.12

AS. 4,5 dan 6 a 16 1.579 0.20 0.35 1.40 1.95 6 18.47

b 13 1.042 0.20 0.35 1.40 1.95 2 4.06

c 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 8 6.89

VOLUME TOTAL 29.42


DIKALI 3 88.26

GRAND TOTAL 1,793.86

4 Pek. Balok B-2.4 30x40


As. 5, 6 dan 7 a 16 1.579 0.20 0.35 16.63 17.18 6 162.73

Overlop b 16 1.579 1.20 1.20 6 11.37

c 13 1.042 0.20 16.63 16.83 2 35.08

Overlop d 13 1.042 1.20 1.20 2 2.50

e 16 1.579 0.20 0.35 3.76 4.31 2 13.61

f 16 1.579 0.20 5.75 5.95 2 18.79

g 16 1.579 0.20 2.23 2.43 2 7.67

h 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 11 8.70

i 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.13


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )

j 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.08

k 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.13

l 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 10 7.99

m 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.13

n 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.08

o 10 0.617 0.10 0.26 0.36 0.26 0.36 1.34 21 17.13

VOLUME TOTAL 371.12


DIKALI 3 1,113.36

5 Pek. Balok B-2.5 25x35


As. B' a 16 1.579 0.20 0.29 11.36 0.29 12.14 4 76.66

16 1.579 0.65 0.65 4 4.10

b 16 1.579 0.20 0.91 1.11 1 1.75

c 16 1.579 0.20 1.55 1.75 1 2.76

d 16 1.579 0.20 2.05 2.25 1 3.55

e 16 1.579 0.20 2.35 2.55 1 4.03

f 16 1.579 0.20 2.45 2.65 1 4.18

g 16 1.579 0.20 2.35 2.55 1 4.03

h 16 1.579 0.20 2.05 2.25 1 3.55

i 16 1.579 0.20 1.55 1.75 1 2.76

j 16 1.579 0.20 0.91 1.11 1 1.75

k 10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 10 6.75

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 8 5.48

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 10 6.75

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 14 9.98

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 14 9.98

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 10 6.75

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 8 5.48

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 10 6.75

VOLUME TOTAL 216.55


DIKALI 1 216.55

As. C a 16 1.579 14.70 14.70 4 92.83

Overlop b 16 1.579 1.20 1.20 4 7.58

c 16 1.579 1.36 1.36 1 2.15

d 16 1.579 2.35 2.35 1 3.71

e 16 1.579 2.45 2.45 1 3.87

f 16 1.579 2.35 2.35 1 3.71

g 16 1.579 2.45 2.45 1 3.87

h 16 1.579 2.35 2.35 1 3.71

i 16 1.579 2.45 2.45 1 3.87

j 16 1.579 2.35 2.35 1 3.71

k 16 1.579 1.36 1.36 1 2.15

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 14 9.98

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 14 9.98

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 14 9.98

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 14 9.98

10 0.617 0.10 0.21 0.31 0.21 0.31 1.14 18 12.37


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
VOLUME TOTAL 270.05
DIKALI 4 1,080.21

GRAND TOTAL 1,296.76


Pembesian Kolom 30 x 50
a 16 1.579 0.10 3.50 3.60 12 68.20

b 10 0.617 0.20 0.26 0.46 0.26 0.46 1.64 19 18.71

c 10 0.617 0.20 0.26 0.46 0.26 0.46 1.64 19 18.71

VOLUME TOTAL 105.62


DIKALI 6 633.71

5 Pek. Plat Lantai Tb 12


ARAH SUMBU X 1 10 0.617 0.12 14.66 14.78 2.00 5 86.04

6 1466 6 10 0.617 0.55 0.55 2.00 5 3.20 Overlop


6 1466 6

2 10 0.617 0.12 7.46 7.58 2.00 7 67.68

3 10 0.617 0.12 3.86 3.98 2.00 7 35.54


6 746 6 6 386 6

6 746 6 6 386 6 4 10 0.617 0.12 7.58 7.70 1.00 11 52.99

10 0.617 0.36 4.47 4.83 1.00 11 33.24

110 195 111 109 111


11 149 11 11 149 11 6 6 11 149 11 6 5 10 0.617 0.12 3.91 4.03 1.00 11 27.73
6
6 6 6
6 118 6 6 211 6 6 116 114 6 6 119

10 0.617 0.24 2.33 2.57 1.00 11 17.69

6 10 0.617 0.12 14.90 15.02 1.00 3 27.42


110 195 195 195 111
11 149 11 11 149 11 11 149 11 11 149 11 6
6
6
6 10 0.617 0.55 0.55 1.00 3 1.00 Overlop
6 118 6 211 6 6 211 6 6 211 6 6 120

10 0.617 0.60 8.71 9.31 1.00 3 16.99

7 10 0.617 0.12 14.66 14.78 2.00 10 178.64


6 1466 6

6 1466 6
10 0.617 0.55 0.55 2.00 10 6.65 Overlop

110 195 195 195 111


11 149 11 11 149 11 11 149 11 11 149 11 6
6
6
6 118 6 6 211 6 6 211 6 6 211 6 6 120

6 1466 6

6 1466 6

110 195 195 195 111


11 149 11 11 149 11 11 149 11 11 149 11 6
6
6
6 118 6 6 211 6 6 211 6 6 211 6 6 120

6 1466 6

6 1466 6
110 195 195 195 111
11 149 11 11 149 11 11 149 11 11 149 11 6
6
6
6 118 6 6 211 6 6 211 6 6 211 6 6 120

6 1466 6
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
6 1466 6
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
8 10 0.617 0.12 14.90 15.02 1.00 4 37.79
110 195 195 195 111
11 149 11 11 149 11 11 149 11 11 149 11 6
6
6
10 0.617 0.55 0.55 1.00 4 1.38 Overlop
6 118 6 6 211 6 6 211 6 6 211 6 6 120

10 0.617 0.60 8.71 9.31 1.00 4 23.42

9 10 0.617 0.12 14.66 14.78 2.00 10 178.64


6 1466 6

6 1466 6
10 0.617 0.55 0.55 2.00 10 6.65 Overlop

10 10 0.617 0.12 14.90 15.02 1.00 13 121.52

110 195 195 195 111

6
11 149 11 11 149 11 11 149 11 11 149 11 6 10 0.617 0.55 0.55 1.00 13 4.45 Overlop
6
6 118 6 6 211 6 6 211 6 6 211 6 6 120

10 0.617 0.12 8.71 8.83 1.00 13 71.44

11 10 0.617 0.12 14.66 14.78 2.00 8 150.20


6 1466 6

6 1466 6 10 0.617 0.55 0.55 2.00 8 5.59 Overlop

12 10 0.617 0.12 11.36 11.48 2.00 8 116.10

6 1136 6
13 10 0.617 0.10 14.70 14.80 62.6 571.33
6 1136 6

10 0.617 0.10 1.20 1.30 62.6 50.18 Overlop

10 0.617 0.10 11.40 11.50 7.2 51.06

VOLUME TOTAL 1,944.59

ARAH SUMBU Y

6 1548 6

6 1548 6 13 10 0.617 0.12 15.48 15.60 2.00 6 106.20

10 0.617 0.55 0.55 2.00 6 3.74 Overlop


179 220 269 247
11 287 11 11 61 11 11 238 11 6
6
6 14 10 0.617 0.12 15.56 15.68 1.00 3 30.17
6 187 6 6 236 6 6 285 6 6 256

10 0.617 0.55 0.55 1.00 3 1.06 Overlop

359 220
11 61 11
269
11 11
247 10 0.617 0.48 9.64 10.12 1.00 3 19.47
11 287 11 238 6
6
6
6 367 6 6 236 6 6 285 6 6 256

15 10 0.617 0.12 17.47 17.59 1.00 6 59.88

10 0.617 0.55 0.55 1.00 6 1.87 Overlop


6 1728 6

6 1728 6 10 0.617 0.48 11.44 11.92 1.00 6 40.58

16 10 0.617 0.12 17.28 17.40 2.00 9 188.85


359 220 269 247
11 287 11 11 61 11 11 238 11 6
6
6
6 10 0.617 0.55 0.55 2.00 9 5.97 Overlop
6 367 6 236 6 6 285 6 6 256

6 1728 6

6 1728 6
6 1728 6

6 1728 6

359 URAIAN
220 / SKETSA 269 247 BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
11 287 11 11 61 11 11 238 11 6
6
6 6 6 6
6 Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
6 367 236 6 285 6 256
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
17 10 0.617 0.12 17.47 17.59 1.00 8 82.44

6 1728 6 10 0.617 0.55 0.55 1.00 8 2.58 Overlop


6 1728 6

10 0.617 0.48 11.44 11.92 1.00 8 55.87

6 1225 6

6 1225 6

359 220 266 6 89 6


11 287 11 11 61 11 6
6
6
6 6 6 6 6 6 89 6
367 236 272

6 1728 6

6 1728 6

359 220 269 247


11 287 11 11 61 11 11 238 11 6
6
6
6 367 6 6 236 6 6 285 6 6 256

179 220 269 247


11 271 11 11 61 11 11 222 11 6
6
6
6 187 6 6 236 6 6 285 6 6 256

6 1548 6

6 1548 6
359 220 269 247
11 287 11 11 61 11 11 238 11 6
6
6
6 367 6 6 236 6 6 285 6 6 256

6 1728 6

6 URAIAN / SKETSA
1728 6 BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
6 1225 6
18 10 0.617 0.12 17.28 17.40 2.00 6 118.46
6 1225 6

10 0.617 0.55 0.55 2.00 6 3.74 Overlop

19 10 0.617 0.12 12.25 12.37 2.00 4 65.91


359 220 266 6 89 6
11 287 11 11 61 11 6
6
6
6 89 6
6 367 6 6 236 6 6 272 10 0.617 0.55 0.55 2.00 4 2.93 Overlop

20 10 0.617 0.12 12.37 12.49 1.00 8 58.54


6 1728 6

6 1728 6 10 0.617 0.55 0.55 1.00 8 2.58 Overlop

10 0.617 0.36 8.75 9.11 1.00 8 42.70


359 220 269 247
11 287 11 11 61 11 11 238 11 6
6
6 21 10 0.617 0.12 0.89 1.01 2.00 14 17.69
6 367 6 6 236 6 6 285 6 6 256

22 10 0.617 0.12 17.28 17.40 2.00 9 188.85

179 220 269


11
247 10 0.617 0.55 0.55 2.00 9 5.97 Overlop
11 271 11 11 61 11 222 11 6
6
6
6 187 6 6 236 6 6 285 6 6 256

23 10 0.617 0.12 17.47 17.59 1.00 6 59.88

10 0.617 0.55 0.55 1.00 6 1.87 Overlop


6 1548 6

6 1548 6 10 0.617 0.48 11.44 11.92 1.00 6 40.58

24 10 0.617 0.12 15.35 15.47 1.00 3 29.76

10 0.617 0.55 0.55 1.00 3 1.06 Overlop

10 0.617 0.48 9.64 10.12 1.00 3 19.47

25 10 0.617 0.12 15.48 15.60 2.00 6 106.20

10 0.617 0.55 0.55 2.00 6 3.74 Overlop

26 10 0.617 0.10 15.65 15.75 58.8 571.10

10 0.617 0.10 1.20 1.30 58.8 47.14 Overlop

10 0.617 0.10 1.80 1.90 58.8 68.89

VOLUME TOTAL 2,055.72

GRAND TOTAL 4,000.31

6 Pembesian Tangga
Plat Lantai a 16 1.579 0.20 3.60 1.60 5.40 22 187.55
a
b 16 1.579 0.20 0.23 3.60 1.60 5.63 22 195.53

c 13 1.042 0.10 1.70 1.80 100 187.59

d 13 1.042 0.10 3.50 3.60 12 43.77

e 13 1.042 0.10 0.45 0.30 0.85 233 206.70


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )

VOLUME TOTAL 821.14

B PEKERJAAN BETON PRAKTIS K -225 U - 24


1 Pembesian Kolom praktis 10/15 (KP.2.1)

a. Tul. Utama a 10 0.617 0.10 3.50 3.60 4 8.88

b 8 0.395 0.10 0.07 0.11 0.07 0.11 0.46 19 3.36

Stek c 10 0.617 0.40 0.40 8 1.97

VOLUME TOTAL 14.21


b. Begel Dikalo 50 710.60

2 Pembesian Kolom praktis 10/15 (KP.2.2)

a. Tul. Utama a 10 0.617 0.10 2.80 2.90 4 7.15

b 8 0.395 0.10 0.07 0.11 0.07 0.11 0.46 15 2.72

Stek c 10 0.617 0.40 0.40 8 1.97

VOLUME TOTAL 11.85


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
b. Begel Dikalo 23 272.55

3 Pembesian Kolom 15/20


a 13 1.042 0.10 3.50 3.60 4 15.01

b 10 0.617 0.10 0.16 0.11 0.16 0.11 0.64 24 9.60

Stek c 10 0.617 0.40 0.40 8 1.97

VOLUME TOTAL 26.58


Dikali 4 106.34
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
4 Pembesian Pet
a
Type 1 a 13 1.042 0.10 0.66 0.13 0.89 13 12.06

b 10 0.617 0.10 1.76 1.86 5 5.74

b
Type 2 a 13 1.042 0.10 0.66 0.13 0.89 16 14.84

b 10 0.617 0.10 2.26 2.36 5 7.28

Type 3 a 10 0.617 0.10 0.66 0.13 0.89 15 8.23

b 10 0.617 0.10 2.06 2.16 5 6.66

Type 4 a 10 0.617 0.10 0.66 0.13 0.89 23 12.62

b 10 0.617 0.10 3.26 3.36 5 10.36

Diatas Kaca Depan Kiri a 13 1.042 0.10 0.75 0.25 1.10 123 141.01

b 10 0.617 0.10 19.80 19.90 6 73.63

Diatas Kaca Depan Kanan a 13 1.042 0.10 0.75 0.25 1.10 123 141.01

b 10 0.617 0.10 19.80 19.90 6 73.63

Diatas Kaca Belakang Kiri a 13 1.042 0.10 0.75 0.25 1.10 52 59.61

b 10 0.617 0.10 8.40 8.50 6 31.45

Diatas Kaca Belakang Kanan a 13 1.042 0.10 0.75 0.25 1.10 52 59.61

b 10 0.617 0.10 8.40 8.50 6 31.45

VOLUME TOTAL 689.18

5 PembesianKolom 30x50 BALOK

Kolom Ruang Pompa a 16 1.579 0.16 3.10 0.30 3.56 12 67.44

b 10 0.617 0.10 0.26 0.46 0.26 0.46 1.54 11 10.45

c 10 0.617 0.10 0.26 0.46 0.26 0.46 1.54 22 20.89

d 10 0.617 0.10 0.26 0.26 0.62 33 12.62

Stek d 16 1.579 0.80 0.80 12 15.16

VOLUME TOTAL 126.55


Dikali 6 759.31

Kolom Atap Depan a 16 1.579 0.08 2.00 2.08 8 26.27

+7.60

Balok
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
b 10 0.617 0.10 0.26 0.46 0.26 0.46 1.54 15 14.25

+7.60 VOLUME TOTAL 40.51


Dikali 4 162.06
Balok

Kolom Atap Belakang a 16 1.579 0.08 1.00 1.08 8 13.64


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
b 10 0.617 0.10 0.26 0.46 0.26 0.46 1.54 7 6.65

VOLUME TOTAL 20.29


Dikali 4 81.15

GRAND TOTAL 1,002.52

6 Pek. Pembesian Balok B-3.4 30x40

a 16 1.579 0.16 0.30 6.86 0.30 7.62 5 60.15

b 16 1.579 0.16 2.20 2.36 4 14.90

c 16 1.579 0.16 3.65 3.81 1 6.01

d 13 1.042 0.10 6.90 7.00 2 14.59

e 10 0.617 0.10 0.36 0.26 0.36 0.26 1.34 21 17.08

f 10 0.617 0.10 0.36 0.26 0.36 0.26 1.34 21 17.08

g 10 0.617 0.10 0.36 0.26 0.36 0.26 1.34 21 17.08

VOLUME TOTAL 146.89


Dikali 3 440.66

7 Pek. Pembesian Balok B-3.5 25x35


a 16 1.579 0.16 0.30 3.90 4.36 4 27.53

b 16 1.579 0.16 0.30 2.20 2.66 2 8.40

c 16 1.579 0.16 2.35 2.51 1 3.96

d 10 0.617 0.10 0.31 0.21 0.31 0.21 1.14 18 12.37

e 10 0.617 0.10 0.31 0.21 0.31 0.21 1.14 12 8.44

f 10 0.617 0.10 0.31 0.21 0.31 0.21 1.14 18 12.37

VOLUME TOTAL 73.07


Dikali 4 292.30

8 Pembesian Plat Lantai Atap

Arah Sumbu X 1 10 0.617 0.10 8.46 8.56 2.00 9 95.02

2 10 0.617 0.10 11.34 11.44 14 98.77


5 846 5

10 0.617 0.10 1.61 1.71 2.00 14 29.53


5 846 5

3 10 0.617 0.10 8.46 8.56 9 47.51

4 10 0.617 0.10 7.66 7.76 7 33.50

153 180 153


8 164 8 8 164 8 5
5
5 161 5 5 161 5
5 846 5

5 846 5

URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )

5 10 0.617 0.10 9.10 9.20 8 45.39


153 180 153
8 164 8 8 164 8 5
5 10 0.617 0.10 2.31 2.41 2.00 8 23.78
5 161 5 5 161 5
6 10 0.617 0.10 7.66 7.76 8 38.28

5 846 5

5 846 5
153 180 153
8 164 8 8 164 8 5
5
5 161 5 URAIAN / SKETSA 5 161 5 BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
7 10 0.617 0.10 9.10 9.20 8 45.39

10 0.617 0.10 2.31 2.41 2.00 8 23.78

8 10 0.617 0.10 7.66 7.76 7 33.50


5 846 5

5 846 5 9 10 0.617 0.10 14.70 14.80 62.6 571.33

VOLUME TOTAL 1,085.75

5 766 5

5 766 5

223 223
8 304 8 5
5
5 231 5 5 231 5

5 766 5

5 766 5

223 223
8 304 8 5
5
5 231 5 5 231 5

5 766 5

5 766 5
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
9 Pembesian Kolom praktis 10/15 (Pas. Bata Atap)

a. Tul. Utama a 10 0.617 0.10 1.82 1.92 4 4.74

b 8 0.395 0.10 0.07 0.10 0.07 0.10 0.44 10 1.75

stek c 10 0.617 0.30 0.30 4 0.74


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )

VOLUME TOTAL 7.23


b. Begel Dikalo 4 28.92

a 10 0.617 0.10 1.63 1.73 4 4.27

b 8 0.395 0.10 0.07 0.10 0.07 0.10 0.44 9 1.59

stek c 10 0.617 0.30 0.30 4 0.74

VOLUME TOTAL 6.60


Dikalo 4 26.39

a 10 0.617 0.10 1.45 1.55 4 3.82

b 8 0.395 0.10 0.07 0.10 0.07 0.10 0.44 8 1.43

stek c 10 0.617 0.30 0.30 4 0.74

VOLUME TOTAL 6.00


Dikalo 4 23.98

a 10 0.617 0.10 1.27 1.37 4 3.38

b 8 0.395 0.10 0.07 0.10 0.07 0.10 0.44 7 1.28

stek c 10 0.617 0.30 0.30 4 0.74

VOLUME TOTAL 5.40


Dikalo 4 21.58

Ruang Pompa a 10 0.617 0.10 3.10 3.20 4 7.89

b 8 0.395 0.10 0.07 0.10 0.07 0.10 0.44 17 2.87

stek c 10 0.617 0.30 0.30 4 0.74

VOLUME TOTAL 11.50


Dikalo 5 57.49

Depan Plank Nama a 10 0.617 0.10 0.50 0.60 4 1.48

b 8 0.395 0.10 0.07 0.10 0.07 0.10 0.44 4 0.61

stek c 10 0.617 0.30 0.30 4 0.74

VOLUME TOTAL 2.83


Dikalo 7 19.79

GRAND TOTAL 178.16

10 Pembesian Balok Praktis 10/15


a 10 0.617 0.10 160.00 160.10 4 394.91
URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
b 8 0.395 0.10 0.07 0.10 0.07 0.10 0.44 801 139.10

Overlop c 10 0.617 0.50 0.50 13 4 16.44

VOLUME TOTAL 550.45


URAIAN / SKETSA BESI PANJANG TIAP BAGIAN ( cm ) TOTAL URAIAN JUMLAH JML
Ø BJ a b c d e PANJANG JUMLAH POTONG BERAT Ket.
(mm) ( Kg ) (m) (m) (m) (m) (m) (M) POTONGAN ( Btg ) ( Kg )
11 Pembesian Balok Latei
a 10 0.617 0.10 187.75 187.85 4 463.36

b 8 0.395 0.10 0.07 0.11 0.07 0.11 0.46 939 170.52

VOLUME TOTAL 633.88

SKETSA GAMBAR
DAFTAR HARGA SATUAN PEKERJAAN BIDANG CIPTA KARYA DAN JASA KONSTRUKSI

NO URAIAN PEKERJAAN KODE SATUAN HARGA SATUAN KET


ANALISA PEKERJAAN (Rp)

II PEKERJAAN TANAH
1 Penggalian 1 m3 tanah biasa sedalam s.d 1 m A.1.5.1.1 M3 Rp 81,453.75

III PEKERJAAN PONDASI


1 Pemasangan 1 m3 pondasi batu belah Camp, 1PC : 4 Pasir Pasang A.3.1.1.2 M3 Rp 769,161.75

IV PEKERJAAN BETON
1 Membuat beton mutu fc = 9,8 Mpa (K 125), slump (12 ± 2) Cm, w/c 0,78 A.4.1.1.2 M3 Rp 920,070.90
2 Membuat beton mutu fc = 14,5 Mpa (K 175), slump (12 ± 2) Cm, w/c 0,66 A.4.1.1.5 M3 Rp 990,641.40
3 Membuat beton mutu fc = 19,3 Mpa (K 225), slump (12 ± 2) Cm, w/c 0,58 A.4.1.1.7 M3 Rp 1,054,470.90
4 Menggunakan Ready Mixed K-250 - M3 Rp 1,323,244.65
5 Pembesian 1 kg dengan besi polos atau besi ulir A.4.1.1.15 Kg Rp 17,244.99
6 Pemasangan 1 m2 bekisting untuk kolom A.4.1.1.20 M2 Rp 202,065.15
7 Pemasangan 1 m2 bekisting untuk balok A.4.1.1.21 M2 Rp 205,530.15
8 Pemasangan 1 m2 bekisting untuk Lantai A.4.1.1.22 M2 Rp 210,465.15
9 Pemasangan 1 m2 bekisting untuk tangga A.4.1.1.24 M2 Rp 191,827.65
10 Pemasangan Bekisting Untuk Sloof, Kolom Praktis, Balok Praktis, Pet Beton - M2 Rp 137,860.80

VI PEKERJAAN BESI DAN ALUMINIUM


1 Pemasangan 1 m2 rangka hollow zincalum 1x40.40.2 mm, modul 60 x 60 Cm, untuk plafon M2 Rp 156,695.70
2 Pemasangan 1 m2 rangka atap baja ringan (canai dingin) profil c75 - M2 Rp 285,054.00
3 Pemasangan 1 m1 kusen pintu alluminium 3" (Coating Powder) A.4.2.1.24 M1 Rp 129,085.64
4 Pemasangan Jendela Type BV-1/ Unit - Unit Rp 546,390.08
5 Pemasangan Jendela Type BV-2/ Unit - Unit Rp 1,356,948.08
6 Anal. Pasangan Framelless Pintu Utama [PD-01] / Unit - Unit Rp 4,747,365.00
7 Anal. Pasangan Jendela Type PD-02/ Unit - Unit Rp 4,517,925.83
8 1 M2 Anal. Memasang Terali Besi Strip 20x3 mm - M2 Rp 389,792.32
9 Anal. Pasangan Jendela Type PA-02/ Unit - Unit Rp 2,484,998.25
10 Anal. Pasangan Jendela Type PA-03/ Unit - Unit Rp 1,382,456.25
11 Anal. Pasangan Jendela Type PJ1-AC/ Unit - Unit Rp 4,208,197.46
12 Anal. Pasangan Jendela Type PJ2-AC/ Unit - Unit Rp 4,575,697.46
13 Anal. Pasangan Jendela Type J2 AC/ Unit - Unit Rp 3,103,170.00
14 Anal. Pasangan Jendela Type BV-1/ Unit - Unit Rp 676,032.00
15 Anal. Pasangan Jendela Type BV-2/ Unit - Unit Rp 1,352,064.00
16 Anal. Pasangan Jendela Type PT.7-AC/ Unit - Unit Rp 12,395,103.00
Anal. Curtain Wall Tb 8 MM Tempered Produk Asahimas M2 Rp 432,756.14

VII PEKERJAAN DINDING


1 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 2 Pasir Pasang A.4.4.1.7 M2 Rp 124,300.05
2 Pemasangan 1 m2 dinding Bata Merah (5x11x22) Cm tebal 1/2 batu Camp, 1PC : 4 Pasir Pasang A.4.4.1.9 M2 Rp 113,483.48
3 Pemasangan 1 m2 Dinding Partisi Gypsun Board Tebal 6 mm - M2 Rp 144,127.20
4 Pemasangan 1 m2 Rangka Partisi Baja Canal Aluminium Truss C-75, 0.75 - M2 Rp 241,573.50
VIII PEKERJAAN PLESTERAN
1 Pemasangan 1 m2 Plesteran 1PC : 2 Pasir Pasang tebal 15 mm A.4.4.2.2 M2 Rp 70,028.99
2 Pemasangan 1 m2 Plesteran 1PC : 3 Pasir Pasang tebal 15 mm A.4.4.2.3 M2 Rp 66,660.01
3 Pemasangan 1 m2 Plesteran 1PC : 4 Pasir Pasang tebal 15 mm A.4.4.2.4 M2 Rp 64,425.69
4 Pemasangan 1 m2 Acian A.4.4.2.27 M2 Rp 39,361.88

IX PEKERJAAN PENUTUP DINDING DAN LANTAI


1 Pemasangan 1 m2 Lantai Granit ukuran 60 Cm x 60 Cm (Setara Garuda) A.4.4.3.9 M2 Rp 272,520.15
2 Pemasangan 1 m2 Lantai keramik ukuran 40 Cm x 40 Cm Bermotif A.4.4.3.36 M2 Rp 246,110.55
3 Pemasangan 1 M1 plint granit ukuran 10 Cm x 60 Cm - M1 Rp 40,845.84
4 Pemasangan 1 M2 Batu Alam W.K Cirebon Uk. 20x40x1,5 cm M2 Rp 238,410.38
5 Pemasangan 1 M' Anal. Stair Nosing Granit 10x60 cm M Rp 37,617.72
6 1 M2 Anal. Pas. Dinding Keramik Toilet 20x40 cm M2 Rp 238,410.38
7 1 M' Anal. Listello Uk. 10 x 40 cm M Rp 31,098.69
8 Pekerjaan Supply dan Pemasangan ACP/M2 M2 Rp 883,575.00

X PEKERJAAN PLAFOND
1 Pemasangan 1 m2 langit-langit PVC tebal 8 mm - M2 Rp 208,194.00

XI PEKERJAAN PENUTUP ATAP


1 Pemasangan 1 m2 genteng bitumen bergelombang memanjang monolayer 3 mm (kemiringan atap-> M2 Rp 234,573.41
2 Pemasangan 1 m panjang nok bitumen monolayer - M1 Rp 175,910.70

XII PEKERJAAN KAYU


1 Anal. Pasangan Daun Pintu Besi Plat Tebal 2 mm Rangkap, Rangka Baja Siku/ M2 - M2 Rp 675,408.30
2 Pemasangan 1 M1 lisplank GRC Board Lebar 30 cm, Tebal 9 mm M1 Rp 36,470.70

NO URAIAN PEKERJAAN KODE HARGA SATUAN


ANALISA SATUAN PEKERJAAN (Rp) KET

XIII PEKERJAAN KUNCI DAN KACA


1 Pemasangan 1 m1 Kaca Stopsol Reflektif ,One Way, Tebal 8 mm - M2 Rp 432,231.14
2 Pemasangan 1 m2 kaca Tempered tebal 10 mm Merk Asahimas - M2 Rp 501,006.14
3 1 M2 Anal. Pasang Kaca Tempered Tebal 12 mm. Merk Asahimas - M2 Rp 695,000.00

XIV PEKERJAAN PENGECATAN


1 Pengecatan bidang kayu baru (1lapis plamuur, 1 lapis cat dasar,3 lapis cat penutup) A.4.7.1.5 M2 Rp 60,607.05
2 Pengecatan 1 m2 tembok baru (1 lapis plamur, 1 lapis cat dasar, 2lapis cat penutup) A.4.7.1.10 M2 Rp 25,690.77
3 Pengecatan Tembok Baru (Exterior) dengan Dulux Weathersheald - M2 Rp 27,526.70
4 Pekerjaan Waterproofing Sheet (Dak Beton) M2 Rp 178,862.25

XV PEKERJAAN SANITASI DALAM GEDUNG


1 Anal. Memasang Closet Duduk setara TOTO CW 421 J / Buah Bh Rp 1,144,248.00
2 Anal. Memasang Closet Jongkok setara TOTO CE9 / Buah Bh Rp 616,140.00
3 Anal. Memasang Jet Washer setara TOTO THX 20 White / Buah - Unit Rp 134,604.75
4 Anal. Memasang Kran Air setara TOTO Tipe T23 B13 / Buah - Unit Rp 103,409.25
5 Anal. Memasang Urinoir setara TOTO U 57 / Buah - Unit Rp 812,122.50
6 Anal. Memasang Floor Drain setara TOTO TX 1 BN / Buah - Unit Rp 66,354.75
7 Anal. Memasang Towel Holder setara TOTO TX 701 AEZ / Buah - Unit Rp 359,814.00
8 Anal. Memasang Paper Holder setara TOTO S 20 / Buah - Unit Rp 333,564.00
9 1 Unit Anal. Meja Wastafel Tebal 8 cm Uk. 65x 180 - Unit Rp 2,582,677.40
10 1 M2 Anal. Pekerjaan Waterproofing Sheet (Dak Beton) - M2 Rp 178,862.25
REKAPITULASI PEKERJAAN ELEKTRIKAL MEKANIKAL

PEEKRJAAN : LANJUTAN PEMBANGUNAN KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN JUMLAH HARGA

1 2 3
C PEKERJAAN ELEKTRIKAL DAN MEKANIKAL

1 PEKERJAAN ELEKTRIKAL

A. Pekerjaan Instalasi Listrik Gedung


a. Penerangan Lantai 1 60,396,600.00
b. Penerangan Lantai 2 62,003,400.00

B. Pek. CCTV
a. Peralatan Utama CCTV 8,344,000.00
b. Instalasi CCTV Lantai 1 7,273,200.00
c. Instalasi CCTV Lantai 2 1,818,300.00

G. Pek. Perlengkapan Utama / Equement


a. Kabel Feeder 1,500,000.00
b. Kabel Power Lantai 1 450,000.00
c. Kabel Power Lantai 2 450,000.00

H. Pek. Panel Power

c. Panel Panel Listrik 11,103,600.00

I. Pek. Penangkal Petir 17,031,000.00

TOTAL BIAYA PEKERJAAN ELEKTRIKAL 170,370,100.00

II PEKERJAAN MEKANIKAL

A Pek. Instalasi Air BERSIH


d. Peralatan Instalasi Air Bersih Roof Tank 3,049,000.00
e. Tangki Rooftank 3,750,000.00
f. Instalasi Air Bersih Pipa PPR Klas PN - 10 Lantai 1 6,950,000.00
(termasuk Accessories & Support)
g. Instalasi Air Bersih Pipa PPR Klas PN -10 Lantai 2 4,380,000.00
(termasuk Accessories & Support)

B Pek. Instalasi Air Bekas, Kotor dan Hujan


a. Instalasi Air Bekas & Kotor Lantai 1 5,282,000.00
b. Instalasi Air Bekas & Kotor Lantai 2 2,372,000.00
c. Instalasi Air Hujan 4,100,000.00
D Trunking Cable
a. Pek Kabel Tray Lantai 1 21,600,000.00
a. Pek Kabel Tray Lantai 2 21,600,000.00

F Fire Extinguisher (Racun Api)


a. Racun Api Lantai 1 5,950,000.00
b. Racun Api Lantai 2 5,100,000.00

TOTAL BIAYA PEKERJAAN MEKANIKAL 84,133,000.00

TOTAL BIAYA PEKERJAAN ELEKTRIKAL 170,370,100.00


TOTAL BIAYA PEKERJAAN MEKANIKAL 84,133,000.00
TOTAL BIAYA PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 254,503,100.00
Bobot

4.50
2.22
ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL MEKANIKAL

PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK
TAHUN ANGGARAN : 2022

NO URAIAN HARGA SATUAN (Rp.) JUMLAH (Rp.)

I. PEK. ELEKTRIKAL

1 Pas. Instalasi Titik Lampu


12 m' Kabel NYM 3 x 2.5 mm 2,000.00 24,000.00
12 m' PVC Hight Impact dia. 20 mm 5,000.00 60,000.00
6 bh Coupling / Socket dia. 20 mm 1,000.00 6,000.00
6 bh Clamp Cable dia. 20 mm 500.00 3,000.00
1 bh Junction Box 3,500.00 3,500.00
1 ls Material / Alat Bantu 1,000.00 1,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 197,500.00
Overhead 5% 9,875.00
Total 207,375.00
Pembulatan 207,300.00

2 Pas. Instalasi Stop Kontak


14 m' Kabel NYM 3 x 2.5 mm 2,000.00 28,000.00
14 m' PVC Hight Impact dia. 20 mm 5,000.00 70,000.00
7 bh Coupling / Socket dia. 20 mm 1,000.00 7,000.00
6 bh Clamp Cable dia. 20 mm 500.00 3,000.00
1 bh Junction Box 3,500.00 3,500.00
1 ls Material / Alat Bantu 1,000.00 1,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 212,500.00
Overhead 5% 10,625.00
Total 223,125.00
Pembulatan 223,100.00

3 Pas. Instalasi Stop Kontak AC


16 m' Kabel NYM 3 x 2.5 mm 2,000.00 32,000.00
16 m' PVC Hight Impact dia. 20 mm 5,000.00 80,000.00
8 bh Coupling / Socket dia. 20 mm 1,000.00 8,000.00
8 bh Clamp Cable dia. 20 mm 500.00 4,000.00
1 bh Junction Box 3,500.00 3,500.00
1 ls Material / Alat Bantu 1,000.00 1,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 228,500.00
Overhead 5% 11,425.00
Total 239,925.00
Pembulatan 239,900.00

Pek. Panel
47 Pek. Panel MDP Gedung Lantai 1
2 unit Box Besi 35 x 55 x 90 3 Fhase 225,000.00 450,000.00
1 bh MCCB Type NSX 3 Pole 125 - 160 A Ajustable Schneider 110,000.00 110,000.00
2 bh MCCB Type NSX 3 Pole 80 -125 A Ajustable Schneider 105,000.00 210,000.00
2 bh MCCB Type NSX 3 Pole 40 -63 A Ajustable Schneider 95,000.00 190,000.00
1 set Ampere, Volt Meter Digital + Current Trasformer 350,000.00 350,000.00
1 ls Accessories (Hanger, Support, Pentanahan Cat, dll) 10,000.00 10,000.00
1 ls Material / Alat Bantu 10,000.00 10,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 1,430,000.00
Overhead 5% 71,500.00
Total 1,501,500.00
Pembulatan 1,501,500.00

48 Pek. Panel Penerangan PP Lantai 1


1 unit Box Besi 35 x 55 x 90 3 Fhase 225,000.00 225,000.00
1 bh MCCB Type NSX 3 Pole 80 - 125 A Ajustable Schneider 110,000.00 110,000.00
18 bh MCCB Type BH-D6 DIN 1 Pole 10A Schneider 105,000.00 1,890,000.00
8 bh MCCB Type BH-D6 DIN 1Pole 6A Schneider 95,000.00 760,000.00
1 set Ampere, Volt Meter Digital + Current Trasformer 350,000.00 350,000.00
1 ls Accessories (Hanger, Support, Pentanahan Cat, dll) 10,000.00 10,000.00
1 ls Material / Alat Bantu 10,000.00 10,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 3,455,000.00
Overhead 5% 172,750.00
Total 3,627,750.00
Pembulatan 3,627,700.00

49 Pek. Panel Penerangan PP Lantai 2


1 unit Box Besi 35 x 55 x 90 3 Fhase 225,000.00 225,000.00
1 bh MCCB Type NSX 3 Pole 125 - 160A Ajustable Schneider 110,000.00 110,000.00
20 bh MCCB Type BH-D6 DIN 1 Pole 10A Schneider 105,000.00 2,100,000.00
8 bh MCCB Type BH-D6 DIN 1Pole 6A Schneider 95,000.00 760,000.00
1 set Ampere, Volt Meter Digital + Current Trasformer 350,000.00 350,000.00
1 ls Accessories (Hanger, Support, Pentanahan Cat, dll) 10,000.00 10,000.00
1 ls Material / Alat Bantu 10,000.00 10,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 3,665,000.00
Overhead 5% 183,250.00
Total 3,848,250.00
Pembulatan 3,848,200.00

Pas. Fixture
50 Pas. Stop Kontak 16A, 1 Phasa Vivace by Schneider
1 bh Stop Kontak 16 A, 1 Phasa Hotel Vivace by Schneide 35,000.00 35,000.00
1 bh Inbow Dus (Metal) 10,000.00 10,000.00
1 lot Upah Pasang 35,000.00 35,000.00
Jumlah 80,000.00
Overhead 5% 4,000.00
Total 84,000.00
Pembulatan 84,000.00

53 Pas. Stop Kontak AC 16A, 1 Phasa Vivace by Schneider -


1 bh Stop Kontak AC Inbow 30,000.00 30,000.00
1 bh Inbow Dus (Metal) 10,000.00 10,000.00
1 lot Upah Pasang 35,000.00 35,000.00
Jumlah 75,000.00
Overhead 5% 3,750.00
Total 78,750.00
Pembulatan 78,000.00

54 Pas. Stop Kontak Lantai 10A, 1 Phasa


1 bh Stop Kontak Lantai 20,000.00 20,000.00
1 bh Inbow Dus (Metal) 10,000.00 10,000.00
1 lot Upah Pasang 35,000.00 35,000.00
Jumlah 65,000.00
Overhead 5% 3,250.00
Total 68,250.00
Pembulatan 68,000.00

56 Pas. Sakelar Tunggal 10A, 1 Phasa type hotel Vivace by Schneider


1 bh Sakelar Tunggal 10A, 1 Phasa type hotel Vivace by Schneider 20,000.00 20,000.00
1 bh Inbow Dus (Metal) 10,000.00 10,000.00
1 lot Upah Pasang 35,000.00 35,000.00
Jumlah 65,000.00
Overhead 5% 3,250.00
Total 68,250.00
Pembulatan 68,000.00

57 Pas. Sakelar Ganda 10A, 1 Phasa type hotel Vivace by Schneider


1 bh Sakelar Ganda 10A, 1 Phasa type hotel Vivace by Schneider 25,000.00 25,000.00
1 bh Inbow Dus (Metal) 10,000.00 10,000.00
1 lot Upah Pasang 35,000.00 35,000.00
Jumlah 70,000.00
Overhead 5% 3,500.00
Total 73,500.00
Pembulatan 73,000.00

59 Pas. Gridswitch 10A, 1 Phasa 6 Gang


1 bh Gridswitch 10A, 1 Phasa 6 Gang 13,000.00 13,000.00
1 bh Inbow Dus 6 gang (Metal) 10,000.00 10,000.00
1 lot Upah Pasang 35,000.00 35,000.00
Jumlah 58,000.00
Overhead 5% 2,900.00
Total 60,900.00
Pembulatan 60,000.00

Penangkal Petir
106 Air Terminal, Radius Proteksi 150 M
1 unit Air Terminal, Radius Proteksi 150 M 750,000.00 750,000.00
1 Bh Tiang (Pipa galvanis 2") panjang 2 meter 200,000.00 200,000.00
1 lot Accessories (hanger support, cat dll) 10,000.00 10,000.00
1 ls Material bantu 10,000.00 10,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 1,070,000.00
Overhead 5% 53,500.00
Total 1,123,500.00
Pembulatan 1,123,000.00

107 Obstruction lamp, LED 100W


1 m'' Obstruction lamp, LED 100W 250,000.00 250,000.00
1 Ls Obstruction lamp (NYM 3x2.5 mm2) 1,500,000.00 1,500,000.00
1 ls Material bantu 10,000.00 10,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 1,860,000.00
Overhead 5% 93,000.00
Total 1,953,000.00
Pembulatan 1,953,000.00

108 Pas. Instalasi grounding (minimal kedalaman 6 m, dengan tahanan


pembumian 1 Ohm)
1 m'' Copper rod diameter 5/8" 500,000.00 500,000.00
2 Lot Instalasi grounding penangkal petir 3,500,000.00 7,000,000.00
1 Bh Handhole (Bak Kontrol 400 x 400 x 400 mm) 2,500,000.00 2,500,000.00
1 ls Material Bantu 10,000.00 10,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 10,110,000.00
Overhead 5% 505,500.00
Total 10,615,500.00
Pembulatan 10,615,000.00

CCTV
95 Recorder 32ch 1x2TB 16 PoE DDN - 3532-212 N16
1 Unit Recorder 32ch 1 x 2 TB 16 PoE DDN - 3532-212N16 415,000.00 415,000.00
1 Unit HDD 2 TB WD PURPLE 375,000.00 375,000.00
1 Unit UPS for Backup Power 2 KVA ICA 850,000.00 850,000.00
1 lot Accessories (hanger , support, cat dll) 10,000.00 10,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 1,750,000.00
Overhead 5% 87,500.00
Total 1,837,500.00
Pembulatan 1,837,000.00

96 HDD 2 TB WD PURPLE
1 Unit HDD 2 TB WD PURPLE 375,000.00 375,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 475,000.00
Overhead 5% 23,750.00
Total 498,750.00
Pembulatan 498,000.00

97 PSU For Camera 12 V 10 V


1 Unit PSU For Camera 12 V 10 V 785,000.00 785,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 885,000.00
Overhead 5% 44,250.00
Total 929,250.00
Pembulatan 929,000.00

98 UPS For Backup Power 2 KVA ICA


1 Unit UPS For Backup Power 2 KVA ICA 850,000.00 850,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 950,000.00
Overhead 5% 47,500.00
Total 997,500.00
Pembulatan 997,000.00

99 Wall Mount Bracket NEZ-A4-WW


1 Unit Wall Mount Bracket NEZ - A4-WW 250,000.00 250,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 350,000.00
Overhead 5% 17,500.00
Total 367,500.00
Pembulatan 367,000.00

101 Indor Dome Camera NUC-21012-F2


1 Unit Indoor Dome Camera NUC - 21012-F2 550,000.00 550,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 650,000.00
Overhead 5% 32,500.00
Total 682,500.00
Pembulatan 682,000.00

104 Pas. TV LED Monitor 32" Clor + Bricket


1 Unit TV LED Monitor 32" Color + Bricket 2,100,000.00 2,100,000.00
1 lot Upah Pasang 100,000.00 100,000.00
Jumlah 2,200,000.00
Overhead 5% 110,000.00
Total 2,310,000.00
Pembulatan 2,310,000.00
0.05

0.05

0.05
0.05

0.05

0.05

0.05
0.05

0.05

0.05

0.05

0.05
0.05

0.05

0.05

0.05

0.05
0.05

0.05

0.05

0.05

0.05
DAFTAR HARGA SATUAN BAHAN ELEKTRIKAL MEKANIKAL

PEKERJAAN : LANJUTAN PEMBANGUNAN GEDUNG KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN SAT HARGA SATUAN

1 2 3 4
A. Pekerjaan Elektrikal Arus Kuat & Arus Lemah

I. Instalasi
1 3 x 2.5 mm' M1 4,000.00
2 2 x 0.6 mm' M1 2,500.00
3 Kabel R_ V (pe)- 20x2x0.6 mm M1 6,500.00
4 KabelUTP CABLE CAT 5e M1 7,500.00
5 KabelUTP CABLE CAT 6e M1 8,500.00
6 1 x 2.5 mm' M1 3,500.00
7 1 x 1.5 mm' M1 3,000.00
8 3 x 2.5 mm' M1 4,000.00
9 Kabel 75 Ohm Coaxial RG 59 M1 9,000.00
10 Kabel RG6 M1 8,500.00
11 Kabel RG11 M1 10,000.00
12 Kabel HDMI Panjang 20 M Bh 50,000.00
13 dia. 20 mm' M1 3,000.00
14 dia. 20 mm' Bh 65,000.00
15 dia. 20 mm' Bh 65,000.00
16 Junction Box Bh 125,000.00

II Kabel Feeder
NYM
1 3 x 2.5 mm' M1 2,000.00
2 Y 3 x 4 mm' M1 2,500.00
3 Y 4 x 4 mm' M1 3,000.00
4 Y 4 x 6 mm' M1 3,500.00
5 4 x 10 mm' M1 4,000.00
6 4 x 16 mm' M1 4,500.00
7 4 x 25 mm' M1 5,000.00
8 4 x 35 mm' M1 5,500.00
9 4 x 50 mm' M1 6,000.00
10 4 x 70 mm' M1 6,500.00
11 4 x 95 mm' M1 7,000.00
12 4 x 120 mm' M1 7,500.00
13 4 x 150 mm' M1 8,000.00
14 4 x 185 mm' M1 8,500.00
15 4 x 240 mm' M1 9,000.00

NYFGby
15 Kabel NYFGby 4 x 185 mm' M1 8,000.00
16 Kabel NYFGby 4 x 150 mm' M1 7,500.00
17 Kabel NYFGby 4 x 120 mm' M1 7,000.00
18 Kabel NYFGby 4 x 95 mm' M1 6,500.00
19 Kabel NYFGby 4 x 70 mm' M1 6,000.00
20 Kabel NYFGby 4 x 50 mm' M1 5,500.00
21 Kabel NYFGby 4 x 35 mm' M1 5,000.00
22 Kabel NYFGby 4 x 25 mm' M1 4,500.00
23 Kabel NYFGby 4 x 16 mm' M1 4,000.00
24 Kabel NYFGby 4 x 10 mm' M1 3,500.00
25 Kabel NYFGby 4 x 6 mm' M1 3,000.00
26 Kabel NYFGby 4 x 4 mm' M1 2,500.00
27 Kabel NYFGby 4 x 2.5 mm' M1 2,000.00

NYY
27 Kabel NYY 1 x 95 mm' M1 4,500.00
28 Kabel NYY 1 x 70 mm' M1 4,000.00
29 Kabel NYY 1 x 50 mm' M1 3,500.00

NO URAIAN PEKERJAAN SAT HARGA SATUAN

30 Kabel NYY 1 x 35 mm' M1 3,000.00


31 Kabel NYY 1 x 25 mm' M1 2,500.00
32 Kabel NYY 1 x 16 mm' M1 2,000.00
33 Kabel NYY 1 x 10 mm' M1 1,500.00

III Panel
1 Box Besi 25 x 35 x 55 3 Fhase Unit 185,000.00
2 Box Besi 35 x 45 x 65 3 Fhase Unit 215,000.00
3 Box Besi 35 x 55 x 90 3 Fhase Unit 225,000.00
4 Box Besi Outdoor 35 x 55 x 90 3 Fhase Unit 255,000.00
5 Box Besi Outdoor 35 x 55 x 120 3 Fhase Unit 285,000.00
6 Box Besi 35 x 55 x 120 3 Fhase Unit 350,000.00
7 Lemari Besi 45 x 65 x 180 3 Fhase Unit 400,000.00
8 Box LDP 6 Group + MCB 1 Fhase Lengkap Unit 375,000.00
9 Box LDP 4 Group + MCB 1 Fhase Lengkap Unit 350,000.00

MCCB
9 MCCB Type NSX 3 Pole 250-630A Ajustable Schneider Bh 125,000.00
10 MCCB Type NSX 3 Pole 250-400A Ajustable Schneider Bh 120,000.00
11 MCCB Type NSX 3 Pole 160-250A Ajustable Schneider Bh 115,000.00
12 MCCB Type NSX 3 Pole 125-160A Ajustable Schneider Bh 110,000.00
13 MCCB Type NSX 3 Pole 80-125A Ajustable Schneider Bh 105,000.00
14 MCCB Type NSX 3 Pole 63-100A Ajustable Schneider Bh 100,000.00
15 MCCB Type NSX 3 Pole 40-63A Ajustable Schneider Bh 95,000.00
16 MCCB Type NSX 3 Pole 25-40A Ajustable Schneider Bh 90,000.00
17 MCCB Type NSX 3 Pole 16-25A Ajustable Schneider Bh 85,000.00
MCCB
18 MCCB Type BH-D6 DIN 1 Pole 16A Schneider Bh 35,000.00
19 MCCB Type BH-D6 DIN 1 Pole 10A Schneider Bh 30,000.00
20 MCCB Type BH-D6 DIN 1 Pole 6A Schneider Bh 25,000.00
21 MCCB Type BH-D6 DIN 1 Pole 25A Schneider Bh 20,000.00
22 MCCB Type BH-D6 DIN 1 Pole 16A Schneider Bh 15,000.00
23 MCCB Type BH-D6 DIN 1 Pole 10A Schneider Bh 13,000.00

24 Timer Swicthing Bh 25,000.00


25 Contactor 10A 1 Fhase Schneider Bh 35,000.00
26 Contactor 16A 1 Fhase Schneider Bh 45,000.00
27 Contactor 25A 1 Fhase Schneider Bh 55,000.00
28 Contactor 35A 1 Fhase Schneider Bh 65,000.00
29 Contactor 40A 1 Fhase Schneider Bh 75,000.00
30 Contactor 60A 1 Fhase Schneider Bh 85,000.00
31 Push Button Bh 35,000.00
32 Foto Cell Bh 25,000.00
33 DOL Starting Motor Set 55,000.00

ATS
34 Automatic Transfer Swicth 1000 A Motorise Unit 150,000.00
35 Digital metering Set 25,000.00
36 Alat Proteksi System (over Voltage Over Load & Pentanahan) Set 125,000.00

Cafasitor Bank
37 Cafasitor Bank 200 KVAR include with Reactive Power Regulator And Unit 275,000.00
Continuos Digital Power Factor Display 6 Steps

Uninterruptible Power Supply (UPS)


38 Uninterruptible Power Supply (UPS) 20 KVA Unit 250,000.00

Accessories Alat Ukur


39 Ampere Volt Meter Digital + Current Transformer Bh 350,000.00
40 Switch Selector Bh 25,000.00
41 Indicator Lamp Bh 75,000.00

IV Fixture
1 Stop Kontak 16 A 1 Phase Hotel Vivace by Schneider Unit 35,000.00

NO URAIAN PEKERJAAN SAT HARGA SATUAN

2 Stop Kontak Double 16A, 1 Phase Vivace by Schneider Unit 25,000.00


3 Stop kontak 16A, 1 Phase di Plafon Vivace by Schneider Unit 25,000.00
4 Stop Kontak AC Inbow Vivace by Schneider Unit 30,000.00
5 Stop Kontak Lantai Unit 20,000.00
6 Stop Kontak 3000W 1 Phase Unit 25,000.00
7 Inbow Dus (Metal) Unit 10,000.00
8 Inbow Dus Double (Metal) Unit 12,000.00
9 Sakelar Tunggal 10 A. 1 Phase type hotel Vivace by Schneider Unit 20,000.00
10 Sakelar Ganda 10 A 1 Phase type hotel Vivace by Schneider Unit 25,000.00
11 Gridswitch 10A, 1 Phase 12 Gang Unit 13,000.00
12 Inbow Dus 12 Gang (Metal) Unit 18,000.00
13 Gridswitch 10 A 1 Phase 6 Gang Unit 5,000.00
14 Inbow Dus 6 gang (Metal) Unit 15,000.00

VII CCTV
Peralatan Utama CCTV
1 Recoder 32ch 1 X2tb 16 PoE DDN -3532-212N16 Unit 415,000.00
2 HDD 2 TB WD PURPLE Unit 375,000.00
3 PSU For Camera 12 V 10 V Unit 785,000.00
4 UPS For Backup Power 2 KVA ICA Unit 850,000.00
5 Indor Dome Camera NUC - 21012-F2 Unit 550,000.00
6 Fix Bullet Camera VTI-4075-V311 Unit 475,000.00
7 Wall Mount Bracket NEZ-A4-WW Bh 250,000.00

IX Penangkal Petir
1 Air Terminal Radius Proteksi 150 M Unit 750,000.00
2 Obstruction lamp LED 100W Bh 250,000.00
3 Inst. Obstruction lamp (NYM 3 x 2.5 mm2) ke PP-AC Atap Ttk 1,500,000.00
4 Tiang (pipa galvanis 2") panjang 2 meter Bh 200,000.00
5 Copper rod diameter 5/8" Bh 500,000.00
6 Down Conduction Cable NYY 1 x 70 mm2 M1 750,000.00
7 Cable Clamp Bh 150,000.00
8 Test Link Bh 500,000.00
9 Handhole (Bak Kontrol 400 x 400 x 400 mm) Bh 2,500,000.00
10 Instalasi grounding penangkal petir (minimal kedalaman 6 m dengan Lot 3,500,000.00
tahanan pembumian 1 Ohm)
XX Trunnking Cable
1 Kabel Tray Elektrikal 300 x 100 mm M1 275,000.00
2 Kabel Tray Elektrikal 200 x 100 mm M1 250,000.00
3 Kabel Ladder Elektrikal 400 x 100 mm M1 325,000.00
4 Kabel Ladder Elektrikal 300 x 100 mm M1 275,000.00
5 Kabel Ladder Elektrikal 400 x 100 mm + Cover M1 325,000.00
6 Under Floor Duct 200 x 38 M1 150,000.00
7 Junction Box Bh 250,000.00
8 Service Box Bh 200,000.00
9 Vertical Access Box Bh 175,000.00

B Pekerjaan Mekanikal
I a. Instalasi Pipa GIP Air Bersih (GIP BS 1387)
1 Pipa GIP Æ 6" /150 mm M1 105,000.00
2 Pipa GIP Æ 4" /100 mm M1 85,000.00
3 Pipa GIP Æ 3" /80 mm M1 65,000.00
4 Pipa GIP Æ 2" 1/2"/65 mm M1 55,000.00
5 Pipa GIP Æ 2" /60 mm M1 45,000.00
6 Pipa GIP Æ 1" 1/2"/50 mm M1 35,000.00
7 Pipa GIP Æ 1 1/4"/40 mm M1 30,000.00
8 Pipa GIP Æ 1"/32 mm M1 25,000.00
9 Pipa GIP Æ 3/4"/25 mm M1 20,000.00
10 Pipa GIP Æ 1/2"/20 mm M1 15,000.00

Pipa PPR Klas PN 10 (termasuk Support)


1 Pipa PPR PN - 10 Dia 100 mm M1 215,000.00
2 Pipa PPR PN - 10 Dia 80 mm M1 195,000.00
3 Pipa PPR PN - 10 Dia 65 mm M1 175,000.00

NO URAIAN PEKERJAAN SAT HARGA SATUAN

4 Pipa PPR PN - 10 Dia 60 mm M1 155,000.00


5 Pipa PPR PN - 10 Dia 50 mm M1 125,000.00
6 Pipa PPR PN - 10 Dia 40 mm M1 110,000.00
7 Pipa PPR PN - 10 Dia 32 mm M1 85,000.00
8 Pipa PPR PN - 10 Dia 25 mm M1 75,000.00
9 Pipa PPR PN - 10 Dia 20 mm M1 55,000.00
10 Pipa PPR PN - 10 Dia 15 mm M1 45,000.00

Pipa PPR Klas PN -20 (termasuk Support)


1 Pipa PPR PN - 20 Dia 50 mm M1 85,000.00
2 Pipa PPR PN - 20 Dia 40 mm M1 75,000.00
3 Pipa PPR PN - 20 Dia 32 mm M1 65,000.00
4 Pipa PPR PN - 20 Dia 25 mm M1 55,000.00
5 Pipa PPR PN - 20 Dia 20 mm M1 45,000.00
6 Pipa PPR PN - 20 Dia 15 mm M1 35,000.00

II. Instalasi Pipa Air Kotor Hujan (PVC Class AW)


1 Pipa PVC. Kls AW Æ 8''200 mm
Pipa M1 85,000.00
Fitting Bh 17,000.00
2 Pipa PVC. Kls AW Æ 6''150 mm
Pipa M1 65,000.00
Fitting Bh 13,000.00
3 Pipa PVC. Kls AW Æ 4''100 mm
Pipa M1 45,000.00
Fitting Bh 10,000.00
4 Pipa PVC. Kls AW Æ 3''80 mm
Pipa M1 30,000.00
Fitting Bh 9,000.00
5 Pipa PVC. Kls AW Æ 2''60 mm
Pipa M1 25,000.00
Fitting Bh 8,000.00
6 Pipa PVC. Kls AW Æ 1 1/2''50 mm
Pipa M1 16,000.00
Fitting Bh 7,000.00
7 Pipa PVC. Kls AW Æ 1 1/4''40 mm
Pipa M1 12,000.00
Fitting Bh 6,000.00
8 Pipa PVC. Kls AW Æ 1 /''32 mm
Pipa M1 10,000.00
Fitting Bh 5,000.00
9 Pipa PVC. Kls AW Æ 3/4''25 mm
Pipa M1 5,000.00
Fitting Bh 4,000.00

Accessories Air Bersih


III Gate Valve
1 Gate Valve Æ 6'' / 150 mm (Bronze) (206A) Bh 65,000.00
2 Gate Valve Æ 4'' / 100 mm (Bronze) Bh 60,000.00
3 Gate Valve Æ 3'' / 80 mm (Bronze) (206A) Bh 55,000.00
4 Gate Valve Æ 2 1/2'' / 65 mm (Bronze) Bh 50,000.00
5 Gate Valve Æ 2'' / 60 mm (Bronze) Bh 45,000.00
6 Gate Valve Æ 1 1/2'' /50 mm (Bronze) Bh 40,000.00
7 Gate Valve Æ 1 1/4''/40 mm (Bronze) Bh 35,000.00
8 Gate Valve Æ 1'' /32 mm (Bronze) Bh 30,000.00
9 Gate Valve Æ 3/4''/ 25 mm (Bronze) Bh 25,000.00
10 Gate Valve Æ 1/2'' /20 mm (Bronze) Bh 20,000.00

IV. Butterfly Valve


1 Butterfly Valve Æ 6"/150 mm (Bronze) Bh 30,000.00
2 Butterfly Valve Æ 4"/100 mm (Bronze) Bh 25,000.00
3 Butterfly Valve Æ 3"/80 mm (Bronze) Bh 20,000.00
4 Butterfly Valve Æ 2 1/2"/65 mm (Bronze) Bh 15,000.00
5 Butterfly Valve Æ 2"/60 mm (Bronze) Bh 10,000.00

NO URAIAN PEKERJAAN SAT HARGA SATUAN

V Check Valve
1 Check Valve Æ 4''/100 mm (Bronze) Bh 32,000.00
2 Check Valve Æ 3''/80 mm (Bronze) Bh 27,000.00
3 Check Valve Æ 2 1/2''/65 mm (Bronze) Bh 22,000.00
4 Check Valve Æ 2''/60 mm (Bronze) Bh 17,000.00
5 Check Valve Æ 1 1/2''/50 mm (Bronze) Bh 12,000.00
6 Check Valve Æ 1 1/4''/40 mm (Bronze) Bh 7,000.00

VI. Flexible Joint


1 Flexible Joint Æ 6''/150 mm Bh 45,000.00
2 Flexible Joint Æ 4''/100 mm Bh 40,000.00
3 Flexible Joint Æ 3''/80 mm Bh 35,000.00
4 Flexible Joint Æ 2 1/2''/65 mm Bh 30,000.00
5 Flexible Joint Æ 2''/60 mm Bh 25,000.00
6 Flexible Joint Æ 1 1/2''/50 mm Bh 20,000.00

VII Stainer
1 Stainer Æ 6''/150 mm (Bronze) Bh 55,000.00
2 Stainer Æ 4''/100 mm (Bronze) Bh 50,000.00
3 Stainer Æ 3''/80 mm (Bronze) Bh 45,000.00
4 Stainer Æ 2 1/2''/65 mm (Bronze) Bh 40,000.00
5 Stainer Æ 2''/60 mm (Bronze) Bh 35,000.00
6 Stainer Æ 1 1/2''/50 mm (Bronze) Bh 30,000.00

Accessories Fire Hydrant 16 Bar


VIII Gate Valve
1 Gate Valve Æ 6''150 mm 10K Bh 45,000.00
2 Gate Valve Æ 4''100 mm 10K Bh 40,000.00
3 Gate Valve Æ 3''80 mm 10K Bh 35,000.00
4 Gate Valve Æ 2 1/2''65 mm 10K Bh 30,000.00
5 Gate Valve Æ 2''/60 mm 10K Bh 25,000.00
6 Gate Valve Æ 1 1/2''50 mm 10K Bh 20,000.00
7 Gate Valve Æ 1 1/4''40 mm 10K Bh 15,000.00
8 Gate Valve Æ 1''/32 mm 10K Bh 10,000.00

IX Butterfly Valve
1 Butterfly Valve Æ 6''/ 150 mm 10K Bh 65,000.00
2 Butterfly Valve Æ 4''/ 100 mm 10K Bh 55,000.00
3 Butterfly Valve Æ 3''/ 80 mm 10K Bh 45,000.00
4 Butterfly Valve Æ 2 1/2''/65 mm 10K Bh 35,000.00
5 Butterfly Valve Æ 2''/60 mm 10K Bh 25,000.00

X Check Valve
1 Check Valve Æ 6''/150 mm 10K Bh 23,000.00
2 Check Valve Æ 4''/100 mm 10K Bh 20,000.00
3 Check Valve Æ 3''/80 mm 10K Bh 17,000.00
4 Check Valve Æ 2 1/2''/65 mm 10K Bh 14,000.00
5 Check Valve Æ 2''/60 mm 10K Bh 11,000.00
6 Check Valve Æ 1 1/2''/50 mm 10K Bh 8,000.00
7 Check Valve Æ 1 1/4''/40 mm 10K Bh 5,000.00

XI Flexible Joint
1 Flexible Joint Æ 6''/150 mm Bh 48,000.00
2 Flexible Joint Æ 4''/100 mm Bh 41,000.00
3 Flexible Joint Æ 3''/80 mm Bh 34,000.00
4 Flexible Joint Æ 2 1/2''/65 mm Bh 27,000.00
5 Flexible Joint Æ 2''/60 mm Bh 20,000.00
6 Flexible Joint Æ 1 1/2''/50 mm Bh 13,000.00

XII Stainer
1 Stainer Æ 6"/150 mm Bh 22,500.00
2 Stainer Æ 4"/100 mm Bh 17,500.00
3 Stainer Æ 3"/80 mm Bh 12,500.00
4 Stainer Æ 2 1/2"/65 mm Bh 10,000.00
5 Stainer Æ 2"/60 mm Bh 7,500.00
6 Stainer Æ 1 1/2"/50 mm Bh 5,000.00

NO URAIAN PEKERJAAN SAT HARGA SATUAN

XIII Accessories
1 Pressure Reducing Valve Æ 65 mm + Accessories Set 175,000.00
2 Air Release Air Valve (ARV) Dia 25 mm Bh 25,000.00
3 Air Release Air Valve (ARV) Dia 150 mm Bh 35,000.00
4 Automatic Air Realase Valve (AARV) Bh 195,000.00
5 Indicating Valve Æ 4''100 mm Bh 35,000.00
6 Water Flow Swicth Æ 4''100 mm Bh 55,000.00
7 Test Valve Rising System Gate Valve 0 Bh 40,000.00
8 Sight Glass 1 1/2' 50 mm Bh 70,000.00
9 Orifice Plate Æ 4''/50 mm Bh 20,000.00
10 Orifice Plate Æ 1 1/2''/50 mm Bh 35,000.00
11 Drain Valve Æ 1 1/2''/50 mm Bh 60,000.00
12 Water Level Control Bh 50,000.00
13 Stop Kran 1/2" Bh 40,000.00
14 Baal Valve 1/2" Bh 15,000.00
15 Baal Valve 1'' Bh 20,000.00
16 Kran Taman 1/2'' Pakai Pengunci Bh 35,000.00
17 Hom Speaker 15 Watt Bh 110,000.00
18 Pressure Gauge cap 0 - 15 kg/cm² Bh 25,000.00
19 Pressure Swicth cap 0 - 10 kg/cm² Bh 20,000.00
20 Priming Tank kapasitas 200 L Bh 385,000.00
21 Safety Relief Valve (4'') Bh 15,000.00
22 Safety Relief Valve (1 1/2'') Bh 10,000.00

XIV Foot Valve


1 Foot Valve Æ 6'' 150 mm Bh 110,000.00
2 Foot Valve Æ 4'' 100 mm Bh 95,000.00
3 Foot Valve Æ 3'' 80 mm Bh 80,000.00
4 Foot Valve Æ 2 1/2'' 65 mm Bh 65,000.00
5 Foot Valve Æ 2'' 60 mm Bh 50,000.00
6 Foot Valve Æ 1 1/2'' 50 mm Bh 35,000.00

XV Flange
1 Flange Æ 6'' /150 mm Bh 75,000.00
2 Flange Æ 4'' /100 mm Bh 65,000.00
3 Flange Æ 3'' /80 mm Bh 55,000.00
4 Flange Æ 2 2/1'' /150 mm Bh 45,000.00
5 Flange Æ 2'' /60 mm Bh 35,000.00
6 Flange Æ 1 1/2'' /150 mm Bh 25,000.00

XVI Seal (gasket)


1 Seal (gasket) Bh 15,000.00
2 Seal Tape Bh 8,000.00

XVII Baut Mur


1 Baut Mur Bh 1,500.00
XVIII Roof Drain
1 Roof Drain Besi Tempa Æ 4" / 100 mm Bh 75,000.00
2 Clean Out diameter 100 Bh 10,000.00
3 Vent Cup diameter 50 Bh 15,000.00

XIX Tabung Kebakaran Fire Extinguisher


FE Tipe ABC Dry Chemical Kapasitas 6 kg Unit 850,000.00
FE Tipe ABC Dry Chemical Kapasitas 5 kg Unit 750,000.00
FE Tipe ABC Dry Chemical Kapasitas 3 kg Unit 650,000.00

XX Tangki Rooftank
1 Roof Tank FRP Panel Kapasitas 6 M3 Set 3,750,000.00
Lengkap dengan dudukan pondasi dan pipa over
Flow dan sistem Termasuk tangga pengontrol

XXI Pek. Box Kontrol


1 Bok Kontrol 150x150x1500 mm + Penutup atas Besi Tempa / Cor Bh 325,000.00
2 Bok Kontrol 100x100x100 mm + Penutup atas Besi Tempa / Cor Bh 425,000.00
3 Bok Kontrol 800x800x800 mm + Penutup atas Besi Tempa / Cor Bh 525,000.00
4 Bok Kontrol 600x600x600 mm + Penutup atas Besi Tempa / Cor Bh 625,000.00
5 Bok Kontrol 500x500x500 mm + Penutup atas Besi Tempa / Cor Bh 725,000.00
JADWAL WAKTU PELAKSANAAN ( TIME SCHEDULE )

PEKERJAAN : LANJUTAN PEMBANGUNAN KANTOR DINAS PERTANIAN


LOKASI : KOTA SOLOK
TAHUN ANGGARAN 2022 : 2022

Bobot Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu Minggu
No Uraian Pekerjaan
% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26
I. A. PEKERJAAN STRUKTUR 100%
1. PEKERJAAN PERSIAPAN 0.29 0.07 0.07 0.07 0.07

2. PEKERJAAN STRUKTUR LANTAI I 3.00 0.75 0.75 0.75 0.38 0.38

3. PEKERJAAN STRUKTUR LANTAI II 11.80 1.47 1.47 1.47 1.47 1.47 1.47 1.47 0.74 0.74

4. PEKERJAAN STRUKTUR LT. PENTHOUSE (ATAP) 6.11 1.53 1.53 1.53 0.76 0.76

5. PEKERJAAN ATAP & PELINGKUP 3.88 0.97 0.97 0.97 0.49 0.49

6. PEKERJAAN HALAMAN 6.82 2.27 2.27 1.14 1.14

II. B. PEKERJAAN ARSITEKTUR -

1. PEKERJAAN ARSITEKTUR LANTAI I 30.15 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 2.51 1.26 1.26

2. PEKERJAAN ARSITEKTUR LANTAI II 27.94 3.10 3.10 3.10 3.10 3.10 3.10 3.10 3.10 1.55 1.55

3. PEKERJAAN ARSITEKTUR LT PENTHOUSE 3.35 0.84 0.84 0.84 0.42 0.42

III. C. PEKERJAAN ELEKTRIKAL 4.46 0.89 0.89 - 0.89 0.89 0.45 0.45

IV. D. PEKERJAAN MEKANIKAL 2.20 0.55 0.55 0.55 0.28 0.28

Jumlah Bobot 100.00

Bobot Rencana 0.072 0.072 0.072 0.072 0.750 0.750 2.225 1.850 1.850 1.475 3.988 3.988 3.988 4.778 8.432 9.007 7.902 8.243 6.653 7.830 7.345 5.472 6.221 4.690 1.137 1.137

Akumulasi Bobot Rencana 0.072 0.145 0.217 0.290 1.040 1.790 4.016 5.866 7.716 9.191 13.179 17.166 21.154 25.932 34.364 43.371 51.273 59.516 66.169 73.999 81.344 86.815 93.037 97.726 98.863 100.00

Bobot Realisasi Mingguan 0.54 2.12 2.70 2.450

Akumulasi Bobot Realisasi Mingguan 0.54 2.66 5.36 7.810

Devias ( + / - ) 0.468 2.515 5.143 7.520

Jangka Waktu Pelaksanaan 180 ( Seratus Delapan Puluh ) Hari Kalender


Solok, 14 April 2022
Penawar,
CV. H A I K A L

(EFILLIAN RAHMI,SE )
Direktris

Anda mungkin juga menyukai