Anda di halaman 1dari 24

CV.

PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- -
Batang, Juli 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 1 (Satu)
Periode : 19 Juli s/d 25 Juli 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50
JUMLAH TOTAL A 2,425,000.00 2.22
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm beserta accessories
2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm beserta 1.00
accessories
unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 1 (Satu)
Periode : 19 Juli s/d 25 Juli 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96
JUMLAH TOTAL C 58,791,430.04 53.82
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan
Rencana Pekerjaan Mingguan Komulatif
Realisasi Pekerjaan Mingguan
Realisasi Pekerjaan Mingguan Komulatif
Deviasi

Batang, Juli 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
CV. PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- - -
Batang, Agustus 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 2 (Dua)
Periode : 26 Juli s/d 1 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50
JUMLAH TOTAL A 2,425,000.00 2.22
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm bese 2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm bese 1.00 unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 2 (Dua)
Periode : 26 Juli s/d 1 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96
JUMLAH TOTAL C 58,791,430.04 53.82
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan
Rencana Pekerjaan Mingguan Komulatif
Realisasi Pekerjaan Mingguan
Realisasi Pekerjaan Mingguan Komulatif
Deviasi

Batang, Agustus 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
CV. PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- - - 0.36
Batang, Agustus 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 3 (Tiga)
Periode : 2 Agustus s/d 8 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23 1.00 250,000.00 0.23 1.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11 1.00 125,000.00 0.11 1.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32 0.06 21,875.00 0.02 0.06 21,875.00 0.02
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50
JUMLAH TOTAL A 2,425,000.00 2.22 396,875.00 0.36 396,875.00 0.36
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm bes 2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm be 1.00 unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 3 (Tiga)
Periode : 2 Agustus s/d 8 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96
JUMLAH TOTAL C 58,791,430.04 53.82
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00 - - 396,875.00 0.36 396,875.00 0.36
Rencana Pekerjaan Mingguan 0.36 0.36
Rencana Pekerjaan Mingguan Komulatif 0.36
Realisasi Pekerjaan Mingguan 0.36 0.36
Realisasi Pekerjaan Mingguan Komulatif 0.36
Deviasi - -

Batang, Agustus 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
CV. PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- - - 0.36 0.47
Batang, Agustus 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 4 (Empat)
Periode : 9 Agustus s/d 15 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23 1.00 250,000.00 0.23 - - 1.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11 1.00 125,000.00 0.11 - - 1.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32 0.06 21,875.00 0.02 0.06 21,875.00 0.02 0.13 43,750.00 0.04
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18 0.50 100,000.00 0.09 0.50 100,000.00 0.09
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50
JUMLAH TOTAL A 2,425,000.00 2.22 396,875.00 0.36 121,875.00 0.11 518,750.00 0.47
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm bes 2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm be 1.00 unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 4 (Empat)
Periode : 9 Agustus s/d 15 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96
JUMLAH TOTAL C 58,791,430.04 53.82
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00 396,875.00 0.36 121,875.00 0.11 518,750.00 0.47
Rencana Pekerjaan Mingguan 0.36 0.11 0.11
Rencana Pekerjaan Mingguan Komulatif 0.36 0.47
Realisasi Pekerjaan Mingguan 0.36 0.11 0.47
Realisasi Pekerjaan Mingguan Komulatif 0.36 0.47
Deviasi - - -

Batang, Agustus 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
CV. PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- - - 0.36 0.47 1.13
Batang, Agustus 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 5 (Lima)
Periode : 16 Agustus s/d 22 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23 1.00 250,000.00 0.23 - - 1.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11 1.00 125,000.00 0.11 - - 1.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32 0.13 43,750.00 0.04 0.06 21,875.00 0.02 0.19 65,625.00 0.06
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18 0.50 100,000.00 0.09 0.50 100,000.00 0.09 1.00 200,000.00 0.18
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87 0.50 475,000.00 0.43 0.50 475,000.00 0.43
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50 0.22 121,000.00 0.11 0.22 121,000.00 0.11
JUMLAH TOTAL A 2,425,000.00 2.22 518,750.00 0.47 717,875.00 0.66 1,236,625.00 1.13
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm bes 2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm be 1.00 unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 5 (Lima)
Periode : 16 Agustus s/d 22 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96
JUMLAH TOTAL C 58,791,430.04 53.82
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00 518,750.00 0.47 717,875.00 0.66 1,236,625.00 1.13
Rencana Pekerjaan Mingguan 0.11 0.55 0.55
Rencana Pekerjaan Mingguan Komulatif 0.47 1.02
Realisasi Pekerjaan Mingguan 0.47 0.55 1.02
Realisasi Pekerjaan Mingguan Komulatif 0.47 1.13
Deviasi - - 0.11

Batang, Agustus 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
CV. PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- - - 0.36 0.47 1.13 8.85
Batang, Agustus 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 6 (Enam)
Periode : 23 Agustus s/d 29 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23 1.00 250,000.00 0.23 - - 1.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11 1.00 125,000.00 0.11 - - 1.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32 0.19 65,625.00 0.06 0.06 21,875.00 0.02 0.25 87,500.00 0.08
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18 1.00 200,000.00 0.18 - - 1.00 200,000.00 0.18
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87 0.50 475,000.00 0.43 - - 0.50 475,000.00 0.43
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50 0.22 121,000.00 0.11 0.78 429,000.00 0.39 1.00 550,000.00 0.50
JUMLAH TOTAL A 2,425,000.00 2.22 1,236,625.00 1.13 450,875.00 0.41 1,687,500.00 1.54
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm beserta accessories 2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm beserta accessories 1.00 unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 6 (Enam)
Periode : 23 Agustus s/d 29 Agustus 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43 1.36 466,556.45 0.43 1.36 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71 - - - - -
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82 466.98 7,444,992.09 6.82 466.98 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07 4.45 71,009.45 0.07 4.45 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86 - - 7,982,558.00 7.31 7,982,558.00 7.31
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96 - - - - - -
JUMLAH TOTAL C 58,791,430.04 53.82 - - 7,982,558.00 7.31 7,982,558.00 7.31
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00 1,236,625.00 1.13 8,433,433.00 7.72 9,670,058.00 8.85
Rencana Pekerjaan Mingguan 0.55 6.69 6.69
Rencana Pekerjaan Mingguan Komulatif 1.02 7.71
Realisasi Pekerjaan Mingguan 1.13 7.72 8.85
Realisasi Pekerjaan Mingguan Komulatif 1.13 8.85
Deviasi 0.11 1.03 1.14

Batang, Agustus 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
CV. PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- - - 0.36 0.47 1.13 8.85 18.23
Batang, September 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 7 (Tujuh)
Periode : 30 Agustus s/d 5 September 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23 1.00 250,000.00 0.23 - - 1.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11 1.00 125,000.00 0.11 - - 1.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32 0.25 87,500.00 0.08 0.06 21,875.00 0.02 0.31 109,375.00 0.10
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18 1.00 200,000.00 0.18 - - 1.00 200,000.00 0.18
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87 0.50 475,000.00 0.43 - - 0.50 475,000.00 0.43
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50 1.00 550,000.00 0.50 - - - 1.00 550,000.00 0.50
JUMLAH TOTAL A 2,425,000.00 2.22 1,687,500.00 1.54 21,875.00 0.02 1,709,375.00 1.56
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm beserta accessories 2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm beserta accessories 1.00 unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 7 (Tujuh)
Periode : 30 Agustus s/d 5 September 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43 1.36 466,556.45 0.43 - - 1.36 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71 640.96 10,218,649.42 9.36 640.96 10,218,649.42 9.36
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82 466.98 7,444,992.09 6.82 - - 466.98 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07 4.45 71,009.45 0.07 - - 4.45 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86 7,982,558.00 7.31 10,218,649.42 9.36 18,201,207.42 16.66
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96 - - - - - - -
JUMLAH TOTAL C 58,791,430.04 53.82 7,982,558.00 7.31 10,218,649.42 9.36 18,201,207.42 16.66
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00 9,670,058.00 8.85 10,240,524.42 9.38 19,910,582.42 18.23
Rencana Pekerjaan Mingguan 6.69 6.76 6.76
Rencana Pekerjaan Mingguan Komulatif 7.71 14.46
Realisasi Pekerjaan Mingguan 8.85 9.38 18.23
Realisasi Pekerjaan Mingguan Komulatif 8.85 18.23
Deviasi 1.14 2.62 3.76

Batang, September 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
CV. PUTRA SAHABAT
KONTRAKTOR DAN PERDAGANGAN
amat Jl. Perintis Kemerdekaan Gg. Beringin No. 31B Batang Telp. (0285) 7907819 Kode Pos 51

PROGRES PELAKSANAAN PEKERJAAN


(Waktu Pelaksanaan : 120 Hari Kalender)

KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL


SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARA: 2022

BULAN 1 BULAN 2 BULAN 3 BULAN 4 BULAN 5

JUMLAH BIAYA BOBOT 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18


NO. URAIAN PEKERJAAN
(Rp.) % 19-Jul 26-Jul 2-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov
s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d s/d 15-Nov
25-Jul 1-Aug 8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov

A. PEKERJAAN PERSIAPAN
1. Pek. Uitzet / Pengukuran & Bouwplank 250,000.00 0.23 0.23
2. Pek. Papan Nama Kegiatan 125,000.00 0.11 0.11
3. Pek. K3 dan Penanganan Covid 19 350,000.00 0.32 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02 0.02
4. Pek. Pembersihan Lokasi 200,000.00 0.18 0.09 0.09
5. Pek. Kisdam 950,000.00 0.87 0.43 0.43
6. Pek. Dewatering 550,000.00 0.50 0.50
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON 19,920,557.89 18.24 3.04 3.04 3.04 3.04 3.04 3.04
II. PEKERJAAN PINTU AIR BESI 28,000,000.00 25.63 6.41 6.41 6.41 6.41
III. PEKERJAAN PENGECATAN 92,885.76 0.09 0.09
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON 54,462,118.13 49.86 6.23 6.23 6.23 6.23 6.23 6.23 6.23 6.23
II. PEKERJAAN PENGECATAN 4,329,311.91 3.96 1.98 1.98
JUMLAH TOTOAL (Non PPN) 109,229,873.69 100.00
Rencana Pekerjaan Mingguan - - 0.36 0.11 0.55 6.69 6.76 9.29 9.29 9.29 9.29 9.29 9.29 8.41 8.41 6.43 6.43 0.11
Rencana Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
Realisasi Pekerjaan Mingguan - - 0.36 0.11 0.66 7.72 9.38 21.80
Realisasi Pekerjaan Mingguan Komulatif - - 0.36 0.47 1.13 8.85 18.23 40.03
Deviasi - - - - 0.11 1.14 3.76 16.27
- - - 0.36 0.47 1.02 7.71 14.46 23.76 33.05 42.34 51.63 60.93 70.22 78.63 87.04 93.47 99.89 100.00
- - - 0.36 0.47 1.13 8.85 18.23 40.03
Batang, September 2022
Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Kontraktor Pelaksana
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO


Direktur Direktur
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 8 (Delapan)
Periode : 6 September s/d 12 September 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
A. PEKERJAAN PERSIAPAN
1 Pek. Uitzet / Pengukuran & Bouwplank 1.00 ls 250,000.00 250,000.00 0.23 1.00 250,000.00 0.23 - - 1.00 250,000.00 0.23
2 Pek. Papan Nama Kegiatan 1.00 ls 125,000.00 125,000.00 0.11 1.00 125,000.00 0.11 - - 1.00 125,000.00 0.11
3 Pek. K3 dan Penanganan Covid 19 1.00 ls 350,000.00 350,000.00 0.32 0.31 109,375.00 0.10 0.06 21,875.00 0.02 0.38 131,250.00 0.12
4 Pek. Pembersihan Lokasi 1.00 ls 200,000.00 200,000.00 0.18 1.00 200,000.00 0.18 - - 1.00 200,000.00 0.18
5 Pek. Kisdam 1.00 ls 950,000.00 950,000.00 0.87 0.50 475,000.00 0.43 - - 0.50 475,000.00 0.43
6 Pek. Dewatering 1.00 ls 550,000.00 550,000.00 0.50 1.00 550,000.00 0.50 - - - 1.00 550,000.00 0.50
JUMLAH TOTAL A 2,425,000.00 2.22 1,709,375.00 1.56 21,875.00 0.02 1,731,250.00 1.58
B. PEKERJAAN PINTU AIR
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.29 m³ 343,056.21 442,542.48 0.41
2 Pek. Pilar pintu air
a. Begisting 9.86 m² 109,136.50 1,076,085.89 0.99
b. Pembesian 200.71 kg 15,942.85 3,199,889.42 2.93
c. Beton Cor ( Mutu K-225 ) 1.29 m³ 1,156,212.71 1,491,514.28 1.37
3 Pek. Lantai Pintu
a. Pembesian 536.53 kg 15,942.85 8,553,817.15 7.83
b. Beton Cor ( Mutu K-225 ) 4.46 m³ 1,156,212.71 5,156,708.67 4.72
Sub Total Beton 19,920,557.89 18.24
II. PEKERJAAN PINTU AIR BESI
1 Pek. Pintu air besi ukuran 0.6x0.9 tebal plat 3mm beserta accessories 2.00 unit 10,750,000.00 21,500,000.00 19.68
2 Pek. Pintu air besi ukuran 0.3x0.7 tebal plat 3 mm beserta accessories 1.00 unit 6,500,000.00 6,500,000.00 5.95
Sub Total 28,000,000.00 25.63
III. PEKERJAAN PENGECATAN
1 Pek. Cat Besi 2.88 m² 32,252.00 92,885.76 0.09
Sub Total Pengecetan 92,885.76 0.09
JUMLAH TOTAL B 48,013,443.65 43.96
PREGRES PELAKSANAAN PEKERJAAN
KEGIATAN : PEMBERDAYAAN PEMBUDI DAYA IKAN KECIL
SUB KEGIATAN : PELAKSANAAN FASILITAS BANTUAN PENDANAAN, BANTUAN PEMBIAYAAN KEMITRAAN USAHA
PEKERJAAN : REHAB SALURAN AIR PASOK ( MASUK ) DAN BUANG ( KELUAR ) BBI SOJOMERTO KECAMATAN REBAN
LOKASI : KABUPATEN BATANG
TAHUN ANGGARAN: 2022 Minggu Ke : 8 (Delapan)
Periode : 6 September s/d 12 September 2022
PROGRESS PELAKSANAAN PKERJAAN
HARGA
JUMLAH BIAYA BOBOT Bobot s/d minggu lalu Bobot minggu ini Bobot s/d minggu ini
NO. URAIAN PEKERJAAN VOLUME SAT. SATUAN Bobot %
(Rp.) % Jumlah Harga Bobot Jumlah Harga
(Rp.) Volume Jumlah Harga (Rp.) Bobot % Volume Volume
(Rp.) % (Rp.)
C. SALURAN DAN KOLAM PASOK
I. PEKERJAAN BETON
1 Pek. Bongkaran beton 1.36 m³ 343,056.21 466,556.45 0.43 1.36 466,556.45 0.43 - - 1.36 466,556.45 0.43
2 Pek. Dinding Beton Saluran dan Kolam Pasok
a. Begisting 91.15 m² 109,136.50 9,947,791.98 9.11 91.15 9,947,791.98 9.11 91.15 9,947,791.98 9.11
b. Pembesian 1,281.91 kg 15,942.85 20,437,298.84 18.71 640.96 10,218,649.42 9.36 640.96 10,218,649.42 9.36 1,281.91 20,437,298.84 18.71
c. Beton Cor ( Mutu K-225 ) 8.96 m³ 1,156,212.71 10,359,665.85 9.48 3.14 3,625,883.05 3.32 3.14 3,625,883.05 3.32
3 Pek. Lantai Saluran dan Kolam Pasok
a. Pembesian 466.98 kg 15,942.85 7,444,992.09 6.82 466.98 7,444,992.09 6.82 - - 466.98 7,444,992.09 6.82
b. Beton Cor ( Mutu K-225 ) 4.96 m³ 1,156,212.71 5,734,803.46 5.25
4 Pek. Besi angkur 4.45 kg 15,942.85 71,009.45 0.07 4.45 71,009.45 0.07 - - 4.45 71,009.45 0.07
Sub Total Beton 54,462,118.13 49.86 18,201,207.42 16.66 23,792,324.44 21.78 41,993,531.86 38.45
II. PEKERJAAN PENGECATAN
1 Pek. Cat no drop dengan serabut fiber 95.83 m² 45,177.00 4,329,311.91 3.96
Sub Total Pengecetan 4,329,311.91 3.96 - - - - - - -
JUMLAH TOTAL C 58,791,430.04 53.82 18,201,207.42 16.66 23,792,324.44 21.78 41,993,531.86 38.45
JUMLAH TOTAL A + B + C (NON PPN) 109,229,873.69 100.00 19,910,582.42 18.23 23,814,199.44 21.80 43,724,781.86 40.03
Rencana Pekerjaan Mingguan 6.76 9.29 9.29
Rencana Pekerjaan Mingguan Komulatif 14.46 23.76
Realisasi Pekerjaan Mingguan 18.23 21.80 40.03
Realisasi Pekerjaan Mingguan Komulatif 18.23 40.03
Deviasi 3.76 12.51 16.27

Batang, September 2022


Diperiksa oleh : Dibuat oleh :
Konsultan Pengawas Penyedia Jasa
CV. BATANG KREASI DESAIN CV. PUTRA SAHABAT

ttd. ttd.
ANDI RUDY HERIANTO, ST. Ir. ALI SUSANTO
Direktur Direktur