1 2 4 4 5 6 7 8 9
II PEKERJAAN STRUKTUR 68.5164 70.2150 73.8759 66.0052 64.2860 - 0.0463 64.2397 86.96
II.1 PEKERJAAN TANAH 1.2776 0.5727 1.2753 1.2859 1.2859 - 1.2859 100.83
II.1A PEKERJAAN LANTAI - 2.0312 2.0446 2.0446 1.8665 - 1.8665 91.29
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 24.0566 25.5935 23.2968 23.1694 23.1694 - 23.1694 99.45
II.2.1 PEKERJAAN PONDASI DALAM 14.5831 16.1200 15.4325 15.4325 15.4325 - 15.4325 100.00
II.2.2 PEKERJAAN BETON PILE CAP 2.8656 2.8656 3.1219 3.1219 3.1219 - 3.1219 100.00
II.2.3 PEKERJAAN BETON SLOOF 6.6080 6.6080 4.7424 4.6150 4.6150 - 4.6150 97.31
II.3 PEKERJAAN BETON STRUKTUR ATAS 43.1822 42.0175 47.2591 39.5052 37.9641 - 0.0463 37.9178 80.23
II.3.1 BETON KOLOM PEDESTAL 2.5382 2.1986 2.8610 2.9243 2.9243 - 2.9243 102.21
II.3.2 ELEVASI ± 0.00 6.6478 6.6478 8.5240 7.6301 7.4060 - 7.4060 86.88
II.3.3 ELEVASI + 2.00 0.0807 0.0807 0.0463 0.0463 0.0463 - 0.0463 100.00
II.3.5 ELEVASI + 4.50 15.4527 14.6275 17.2176 13.5133 12.1500 - 12.1500 70.57
II.3.6 ELEVASI + 8.00 3.1040 3.1040 - - 0.0463 - 0.0463 -
II.3.7 ELEVASI + 8.50 4.4902 4.4902 4.4131 3.8789 3.8789 - 3.8789 87.89
II.3.8 ELEVASI + 11.00 4.4249 4.4249 5.1605 3.2046 3.2046 - 3.2046 62.10
II.3.9 ELEVASI + 11.50 6.4438 6.4438 9.0365 8.3078 8.3078 - 8.3078 91.94
III PEKERJAAN ARSITEKTUR 29.0511 27.3476 23.5919 30.1389 7.2677 1.4855 8.7533 37.10
III.1 LANTAI SATU 0.5562 0.7575 0.8729 3.1655 0.2409 - 0.2409 27.60
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.4259 0.6272 0.7910 3.0836 0.2409 - 0.2409 38.42
III.1.2 PEKERJAAN TANGGA 0.1304 0.1304 0.0819 0.0819 - - - -
III.2 FINISHING LUAR GEDUNG 28.4949 26.5901 22.7190 26.9734 7.0268 - 8.5124 37.47
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 11.9513 11.9513 7.7275 10.8918 1.3803 - 2.8659 23.98
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 10.7750 10.7750 8.8044 9.7106 1.4703 - 1.4703 13.65
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 5.7686 3.8637 6.1871 6.3710 4.1762 - 4.1762 108.09
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.6385 0.6385 0.6385 1.9627 0.1194 - 0.1194 18.70
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.0416 0.0416 0.0416 0.0416 - - - -
IV.1.1 SHAFT PIPA 0.0416 0.0416 0.0416 0.0416 - - - -
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.1958 0.1958 0.1958 0.1925 0.0357 - 0.0357 18.23
IV.2.1 SHAFT PIPA 0.0515 0.0515 0.0515 0.0136 - - - -
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.0807 0.0807 0.0807 0.0759 0.0357 - 0.0357 44.22
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.0636 0.0636 0.0636 0.0440 - - - -
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.0590 -
IV.3 INSTALASI PEMPIPAAN AIR HUJAN 0.4011 0.4011 0.4011 1.7286 0.0837 - 0.0837 20.87
IV.3.1 PIPA TEGAK 0.0837 0.0837 0.0837 0.2579 0.0837 - 0.0837 100.00
IV.3.2 LANTAI DAK FFL. ±12.000 0.0546 0.0546 0.0546 0.0074 - - - -
IV.3.3 LANTAI DAK FFL. ±8.000 0.0740 0.0740 0.0740 0.0058 - - - -
IV.3.4 LANTAI DUA 0.0740 0.0740 0.0740 - - - - -
IV.3.5 LANTAI SATU 0.1148 0.1148 0.1148 0.0584 - - - -
IV.3.6 LANTAI DAK FFL. ±14.50 0.0451 - - -
IV.4 LAMPU & INST. PENERANGAN &STOP KONTAK 0.9398 - - -
IV.5 PEKERJAAN PENANGKAL PETIR 0.4141 - - -
100.000 100.000 100.000 100.000 73.4003 1.4392 74.8395
Rencana Komulatif Bobot Per Minggu 95.160
Realisasi Komulatif Bobot Per Minggu 74.840
Deviasi - 20.321 [ LAMBAT ]
Page 1 of 89
1 03 Agustus 2021 1 Selasa 1 03 Agustus 2021 s.d 8 Agustus 2021 I SATU
2 4 Agustus 2021 2 Rabu 2 9 Agustus 2021 s.d 15 Agustus 2021 II DUA
3 5 Agustus 2021 3 Kamis 3 16 Agustus 2021 s.d 22 Agustus 2021 ad2 III TIGA
4 6 Agustus 2021 4 Jum'at 4 23 Agustus 2021 s.d 29 Agustus 2021 I IV EMPAT
5 7 Agustus 2021 5 Sabtu 5 30 Agustus 2021 s.d 5 september 2021 V LIMA
6 8 Agustus 2021 6 1 Minggu 6 6 september 2021 s.d 12 september 2021 VI ENAM
7 9 Agustus 2021 1 Senin 7 13 september 2021 s.d 19 september 2021 VII TUJUH
8 10 Agustus 2021 2 Selasa 8 20 september 2021 s.d 26 september 2021 II VIII DELAPAN
9 11 Agustus 2021 3 Rabu 9 27 september 2021 s.d 3 Oktober 2021 IX SEMBILAN
10 12 Agustus 2021 4 Kamis 10 4 Oktober 2021 s.d 10 Oktober 2021 X SEPULUH
11 13 Agustus 2021 5 Jum'at 11 11 Oktober 2021 s.d 17 Oktober 2021 XI SEBELAS
12 14 Agustus 2021 6 Sabtu 137 12 18 Oktober 2021 s.d 24 Oktober 2021 III XII DUA BELAS
13 15 Agustus 2021 7 2 Minggu 13 25 Oktober 2021 s.d 31 Oktober 2021 AD3 XIII TIGA BELAS
14 16 Agustus 2021 1 Senin 14 01 November 2021 s.d 7 November 2021 XIV EMPAT BELAS
15 17 Agustus 2021 2 Selasa 15 08 November 2021 s.d 14 November 2021 XV LIMA BELAS
16 18 Agustus 2021 3 Rabu 16 15 November 2021 s.d 21 November 2021 XVI ENAM BELAS
17 19 Agustus 2021 4 Kamis 17 22 November 2021 s.d 28 November 2021 IV XVII TUJUH BELAS
18 20 Agustus 2021 5 Jum'at 18 29 November 2021 s.d 5 Desember 2021 XVIII DELAPAN BELAS
19 21 Agustus 2021 6 Sabtu 19 6 Desember 2021 s.d 12 Desember 2021 XIX SEMBILAN BELAS
20 22 Agustus 2021 7 3 Minggu 20 13 Desember 2021 s.d 19 Desember 2021 XX DUA PULUH
21 23 Agustus 2021 1 Senin 21 20 Desember 2021 s.d 26 Desember 2021 XI DUA PULUH SATU
22 24 Agustus 2021 2 Selasa 22 27 Desember 2021 s.d 30 Desember 2021 V XII DUA PULUH DUA
23 25 Agustus 2021 3 Rabu
24 26 Agustus 2021 4 Kamis kebutuhan resapan : IV 14 - 18
25 27 Agustus 2021 5 Jum'at kunci per 1000 adalah 40 m3
26 28 Agustus 2021 6 Sabtu atau 40 / 1000 0.04 m3 per persegi
27 29 Agustus 2021 7 4 Minggu 3,625.32 X 0.04 145.01
28 30 Agustus 2021 1 Senin
29 31 Agustus 2021 2 Selasa rekayasa resapan :
30 01 september 2021 3 Rabu V=πxrxrxt 3.14 0.75 0.75
31 2 september 2021 4 Kamis 12.36
32 3 september 2021 5 Jum'at 11.73
33 4 september 2021 6 Sabtu KOLOM lantai 1
34 5 september 2021 7 5 Minggu
35 6 september 2021 1 Senin
36 7 september 2021 2 Selasa
37 8 september 2021 3 Rabu
38 9 september 2021 4 Kamis
39 10 september 2021 5 Jum'at
40 11 september 2021 6 Sabtu
41 12 september 2021 7 6 Minggu
42 13 september 2021 1 Senin
43 14 september 2021 2 Selasa
44 15 september 2021 3 Rabu
45 16 september 2021 4 Kamis
46 17 september 2021 5 Jum'at
47 18 september 2021 6 Sabtu
48 19 september 2021 7 7 Minggu
49 20 september 2021 1 Senin
50 21 september 2021 2 Selasa
51 22 september 2021 3 Rabu
52 23 september 2021 4 Kamis
53 24 september 2021 5 Jum'at
54 25 september 2021 6 Sabtu
55 26 september 2021 7 8 Minggu 95
56 27 september 2021 1 Senin
57 28 september 2021 2 Selasa
58 29 september 2021 3 Rabu
59 30 september 2021 4 Kamis
60 01 Oktober 2021 5 Jum'at
61 2 Oktober 2021 6 Sabtu
62 3 Oktober 2021 7 9 Minggu
63 4 Oktober 2021 1 Senin
64 5 Oktober 2021 2 Selasa
65 6 Oktober 2021 3 Rabu
66 7 Oktober 2021 4 Kamis
67 8 Oktober 2021 5 Jum'at
68 9 Oktober 2021 6 Sabtu
69 10 Oktober 2021 7 10 Minggu
70 11 Oktober 2021 1 Senin
71 12 Oktober 2021 2 Selasa 7
72 13 Oktober 2021 3 Rabu
73 14 Oktober 2021 4 Kamis
74 15 Oktober 2021 5 Jum'at
75 16 Oktober 2021 6 Sabtu
76 17 Oktober 2021 7 11 Minggu
77 18 Oktober 2021 1 Senin
78 19 Oktober 2021 2 Selasa
79 20 Oktober 2021 3 Rabu
80 21 Oktober 2021 4 Kamis
81 22 Oktober 2021 5 Jum'at
82 23 Oktober 2021 6 Sabtu
83 24 Oktober 2021 7 12 Minggu
84 25 Oktober 2021 1 Senin
85 26 Oktober 2021 2 Selasa
86 27 Oktober 2021 3 Rabu
87 28 Oktober 2021 4 Kamis
88 29 Oktober 2021 5 Jum'at
89 30 Oktober 2021 6 Sabtu
90 31 Oktober 2021 7 13 Minggu
91 01 November 2021 1 Senin
92 2 November 2021 2 Selasa
93 3 November 2021 3 Rabu
94 4 November 2021 4 Kamis
95 5 November 2021 5 Jum'at
96 6 November 2021 6 Sabtu
97 7 November 2021 7 14 Minggu
98 8 November 2021 1 Senin
99 9 November 2021 2 Selasa
100 10 November 2021 3 Rabu
101 11 November 2021 4 Kamis
102 12 November 2021 5 Jum'at
103 13 November 2021 6 Sabtu
104 14 November 2021 7 15 Minggu
105 15 November 2021 1 Senin
106 16 November 2021 2 Selasa
107 17 November 2021 3 Rabu
108 18 November 2021 4 Kamis
109 19 November 2021 5 Jum'at
110 20 November 2021 6 Sabtu
111 21 November 2021 7 16 Minggu
112 22 November 2021 1 Senin
113 23 November 2021 2 Selasa 37
114 24 November 2021 3 Rabu
115 25 November 2021 4 Kamis
116 26 November 2021 5 Jum'at
117 27 November 2021 6 Sabtu
118 28 November 2021 7 17 Minggu
119 29 November 2021 1 Senin
120 30 November 2021 2 Selasa
121 01 Desember 2021 3 Rabu
122 2 Desember 2021 4 Kamis
123 3 Desember 2021 5 Jum'at
124 4 Desember 2021 6 Sabtu
125 5 Desember 2021 7 18 Minggu
126 6 Desember 2021 1 Senin
127 7 Desember 2021 2 Selasa
128 8 Desember 2021 3 Rabu
129 9 Desember 2021 4 Kamis
130 10 Desember 2021 5 Jum'at
131 11 Desember 2021 6 Sabtu
132 12 Desember 2021 7 19 Minggu
133 13 Desember 2021 1 Senin
134 14 Desember 2021 2 Selasa
135 15 Desember 2021 3 Rabu
136 16 Desember 2021 4 Kamis
137 17 Desember 2021 5 Jum'at
138 18 Desember 2021 6 Sabtu
139 19 Desember 2021 7 20 Minggu
140 20 Desember 2021 1 Senin
141 21 Desember 2021 2 Selasa
142 22 Desember 2021 3 Rabu
143 23 Desember 2021 4 Kamis
144 24 Desember 2021 5 Jum'at
145 25 Desember 2021 6 Sabtu
146 26 Desember 2021 7 21 Minggu
147 27 Desember 2021 1 Senin
148 28 Desember 2021 2 Selasa
149 29 Desember 2021 3 Rabu
150 30 Desember 2021 4 22 Kamis
LAPORAN MINGGUAN
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 23.297 3,052,309,959.81 23.169 23.169 - 23.169
Data Pondasi
- Pondasi Tiang Pancang Mini Pile 25x25 cm
- Mutu Beton Tiang Pancang K-450
- Kedalaman Pondasi ± 18.5 meter dari MT asli
- Jenis dan Jumlah Pile Cap
Type F1/1 Pile 10 ttk
Type F2/2 Pile 8 ttk
Type F4/4 Pile 24 ttk
Type F6/6 Pile 16 ttk
Type F1K/1 Pile 29 ttk
Type F2K/2 Pile 2 ttk
II.2.2 PEKERJAAN BETON PILE CAP 3.122 411,280,713.26 3.122 3.122 - 3.122
1 Pile Cap Type F1/1 Pile Bangunan Utama 0.126 16,607,015.45 0.126 0.126 - 0.126
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 0.48 0.001 0.48 111,693.04 0.001 0.48 0.0008 - - 0.48 0.0008 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 0.48 0.003 0.48 447,937.99 0.003 0.48 0.0034 - - 0.48 0.0034 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 25.50 0.034 25.50 4,424,760.00 0.034 25.50 0.0336 - - 25.50 0.0336 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 171.29 0.017 171.29 2,283,240.97 0.017 171.29 0.0173 - - 171.29 0.0173 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 259.46 0.026 259.46 3,458,637.20 0.026 259.46 0.0263 - - 259.46 0.0263 100.00
f. Pek. Beton K-300 m2 1,229,960.00 4.78 0.045 4.78 5,880,746.25 0.045 4.78 0.0446 - - 4.78 0.0446 100.00
2 Pile Cap Type F2/2 Pile 0.237 31,184,942.45 0.237 0.237 - 0.237
5
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 1.24 0.002 1.24 285,934.18 0.002 1.24 0.0022 - - 1.24 0.0022 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 1.24 0.009 1.24 1,146,721.25 0.009 1.24 0.0087 - - 1.24 0.0087 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 36.72 0.048 36.72 6,371,654.40 0.048 36.72 0.0484 - - 36.72 0.0484 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 303.40 0.031 303.40 4,044,280.84 0.031 303.40 0.0307 - - 303.40 0.0307 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 321.20 0.033 321.20 4,281,641.39 0.033 321.20 0.0325 - - 321.20 0.0325 100.00
f. Pek. Beton K-300 m2 1,229,960.00 12.24 0.114 12.24 15,054,710.40 0.114 12.24 0.1143 - - 12.24 0.1143 100.00
3 Pile Cap Type F4/4 Pile 0.956 125,882,883.70 0.956 0.956 - 0.956
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 0.008 4.64 1,072,253.16 0.008 4.64 0.0081 - - 4.64 0.0081 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 0.033 4.64 4,300,204.68 0.033 4.64 0.0326 - - 4.64 0.0326 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 122.40 0.161 122.40 21,238,848.00 0.161 122.40 0.1612 - - 122.40 0.1612 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 3,212.03 0.325 3,212.03 42,816,413.86 0.325 3,212.03 0.3250 - - 3,212.03 0.3250 100.00
e. Pek. Beton K-300 m2 1,229,960.00 45.90 0.429 45.90 56,455,164.00 0.429 45.90 0.4285 - - 45.90 0.4285 100.00
4 Pile Cap Type F6/6 Pile 1.065 140,260,562.57 1.065 1.065 - 1.065
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 0.008 4.64 1,072,253.16 0.008 4.64 0.0081 - - 4.64 0.0081 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 0.033 4.64 4,300,204.68 0.033 4.64 0.0326 - - 4.64 0.0326 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 102.00 0.134 102.00 17,699,040.00 0.134 102.00 0.1343 - - 102.00 0.1343 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 1,906.51 0.193 1,906.51 25,413,830.55 0.193 1,906.51 0.1929 - - 1,906.51 0.1929 100.00
e. Pek. Pembesian ɸ 22 kg 13,330.00 2,649.67 0.268 2,649.67 35,320,070.17 0.268 2,649.67 0.2681 - - 2,649.67 0.2681 100.00
f. Pek. Beton K-300 m2 1,229,960.00 45.90 0.429 45.90 56,455,164.00 0.429 45.90 0.4285 - - 45.90 0.4285 100.00
6
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
II.3 PEKERJAAN BETON STRUKTUR ATAS 47.260 5,204,355,779.37 39.505 37.918 - 37.918
II.3.1 BETON KOLOM PEDESTAL 2.861 385,237,688.60 2.924 2.924 - 2.924
1 Pek. Kolom K 40x40 cm 0.137 17,843,249.42 0.135 0.135 - 0.135
a. Pek. Bekisting Kolom m2 184,440.00 16.80 0.024 15.72 2,899,396.80 0.022 15.72 0.0220 - - 15.72 0.0220 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 - - - - - - - - -
b1. Pek. Pembesian Ø 25 kg 13,330.00 924.75 0.094 924.75 12,326,917.50 0.094 924.75 0.0936 - - 924.75 0.0936 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 41.31 0.004 41.31 550,602.32 0.004 41.31 0.0042 - - 41.31 0.0042 100.00
d. Pek. Beton K-300 m3 1,229,960.00 1.68 0.016 1.68 2,066,332.80 0.016 1.68 0.0157 - - 1.68 0.0157 100.00
7
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
b. Pek. Pembesian Ø 25 kg 13,330.00 17,801.44 1.801 14,241.15 189,834,529.50 1.441 14,241.15 1.4410 - - 14,241.15 1.4410 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,351.27 0.440 3,624.19 48,310,471.68 0.367 3,624.19 0.3667 - - 3,624.19 0.3667 100.00
d. Pek. Beton K-300 m3 1,229,960.00 86.40 0.807 69.12 85,014,835.20 0.645 69.12 0.6453 - - 69.12 0.6453 100.00
8
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
BETON KOLOM (Elv + 4.50 - Elv ± 8,50 dan ± 9,50) Grid A-D, Kelas 4.683 228,891,048.15 1.737 1.737 - 1.737
1 Pek. Kolom K 50x80 cm 0.266 19,767,328.52 0.150 0.150 - 0.150
a. Pek. Bekisting Kolom m2 184,440.00 26.00 0.036 19.50 3,596,580.00 0.027 19.50 0.0273 - - 19.50 0.0273 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 1,525.84 0.154 678.15 9,039,739.50 0.069 678.15 0.0686 - - 678.15 0.0686 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 371.75 0.038 239.70 3,195,137.02 0.024 239.70 0.0243 - - 239.70 0.0243 100.00
d. Pek. Beton K-300 m3 1,229,960.00 4.00 0.037 3.20 3,935,872.00 0.030 3.20 0.0299 - - 3.20 0.0299 100.00
9
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
c. Pek. Pembesian Ø 12 kg 13,330.00 4,526.65 0.458 4,510.85 60,129,638.52 0.456 4,510.85 0.4564 - - 4,510.85 0.4564 100.00
d. Pek. Beton K-300 m3 1,229,960.00 53.58 0.500 49.58 60,985,229.68 0.463 49.58 0.4629 - - 49.58 0.4629 100.00
10
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
a. Pek. Bekisting Kolom m2 184,440.00 460.80 0.645 395.76 72,993,820.70 0.554 395.76 0.5541 - - 395.76 0.5541 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 15,535.80 1.572 13,378.05 178,329,406.50 1.354 13,378.05 1.3537 - - 13,378.05 1.3537 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,808.82 0.487 4,250.59 56,660,429.75 0.430 4,250.59 0.4301 - - 4,250.59 0.4301 100.00
d. Pek. Beton K-300 m3 1,229,960.00 92.16 0.860 79.36 97,609,625.60 0.741 79.36 0.7409 - - 79.36 0.7409 100.00
III.2 FINISHING LUAR GEDUNG 22.719 3,553,437,189.79 26.973 7.0268 1.4855 8.5124
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 7.728 1,434,871,225.63 10.892 1.3803 328.815 1.4855 2.8659
1 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm
aluminium skin 0.3 mm tkdn 61%
a Posisi : Tampak Luar Bangunan pada kolom dan balok silang m2 595,180.00 965.64 4.363 1,662.41 989,430,207.90 7.511 248.28 1.122 136.02 0.615 384.30 1.7362 23.12
b Posisi : leher atap dan background logo m2 595,180.00 407.20 1.840 407.20 242,357,296.00 1.840 - - 192.80 0.871 192.80 0.8710 47.35
c Posisi : Keliling sisi samping atap m2 595,180.00 25.25 0.114 25.25 15,027,104.64 0.114 - - - - - - -
d Posisi : Plafond Atap m2 595,180.00 - - - - - - - - - - - -
11
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
2 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm m2 595,180.00 226.00 1.021 226.00 134,510,680.00 1.021 - - - - - - -
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 8.804 1,279,262,448.96 9.711 1.4703 - 1.4703
Lengkap dengan Accessories dan berfungsi dengan baik
1 Pek. Pengadaan dan Pemasangan Pintu Kaca 2 Daun (Frame less) Posisi : Lantai unit 5,540,700.00 2.00 0.084 2.00 11,081,400.00 0.084 - - - - - -
Pek. Pengadaan dan Pemasangan Pintu Kaca 1 Daun Posisi : Lantai 1 (Pintu
2 unit 2,750,340.00 1.00 0.021 1.00 2,750,340.00 0.021 - - - - - -
Masuk)
3 Pek. Curtain Wall type 1 - T = 11.50 m Posisi : area hall dll m2 804,122.00 916.20 5.592 1,064.10 855,666,220.20 6.495 240.89 1.4703 - - 240.89 1.4703 22.64
4 Pek. Curtain Wall type 2 - T = 8.50 m Posisi : area kelas dll m2 804,122.00 509.01 3.107 509.58 409,764,488.76 3.110 - - - - - - -
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 6.187 839,303,515.20 6.371 4.1762 - 4.1762
Posisi : area atap area tengah
1 Pabrikasi dan pemasangan struktur Kolom rangka baja dan atap WF termasuk z kg 35,000.00 17,465.47 4.640 18,157.45 635,510,904.00 4.824 15,718.92 4.1762 - - 15,718.92 4.1762 86.57
2 Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 l m2 207,144.00 722.30 1.136 722.30 149,620,111.20 1.136 - - - - - - -
3 Pek. Aluminium foil insulasi atap [thermal foam 5 mm] m2 75,000.00 722.30 0.411 722.30 54,172,500.00 0.411 - - - - - - -
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.639 258,560,814.05 1.963 0.119 - 0.119
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.042 5,484,600.00 0.042 - - -
IV.1.1 SHAFT PIPA 0.042 5,484,600.00 0.042 - - -
1 Pipa PPR PN-10 Dia. 2 Inci pada shaft Gedung Utama m' 365,640.00 15.00 0.042 15.00 5,484,600.00 0.042 - - - - - - -
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.196 25,358,577.75 0.192 0.036 - 0.036
IV.2.1 SHAFT PIPA 0.051 1,796,008.50 0.014 - - -
1 PVC AW Dia.4 Inci Shaft Gedung Utama M' 128,227.00 25.00 0.024 9.00 1,154,043.00 0.009 - - - - - - -
2 PVC AW Dia.3 Inci Shaft Gedung Utama M' 71,329.50 25.00 0.014 9.00 641,965.50 0.005 - - - - - - -
3 PVC D Dia.3 Inci Shaft Gedung Utama M' 59,655.20 30.00 0.014 - - - - - - - - - -
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.081 9,994,701.75 0.076 0.036 - 0.036
1 PVC AW Dia.4 Inci M' 128,227.00 30.00 0.029 42.00 5,385,534.00 0.041 30.000 0.029 - - 30.000 0.029 71.429
2 PVC AW Dia.3 Inci M' 71,329.50 12.00 0.006 45.00 3,209,827.50 0.024 12.000 0.006 - - 12.000 0.006 26.67
3 PVC AW Dia.2 Inci M' 41,085.00 60.00 0.019 25.00 1,027,125.00 0.008 - - - - - - -
4 PVC D Dia.2 Inci M' 35,359.50 70.00 0.019 - - - - - - - - - -
5 PVC D Dia.1,5 Inci M' 27,571.50 16.00 0.003 13.50 372,215.25 0.003 - - - - - - -
6 PVC D Dia.1,25 Inci M' 22,951.50 24.00 0.004 - - - - - - - - - -
12
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
IV.3 INSTALASI PEMIPAAN AIR HUJAN 0.401 49,359,309.00 0.375 0.084 - 0.084
IV.3.1 PIPA TEGAK 0.084 33,980,155.00 0.258 0.084 - 0.084
1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 86.00 0.084 265.00 33,980,155.00 0.258 86.000 0.084 - - 86.000 0.084 32.453
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK - 123,801,466.80 0.940 - - -
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 - 31,057,873.50 0.236 - - -
1 FREZA ARTNRL-225 18 Watt 3000K (Item Baru) buah 750,000.00 - - 30.00 22,500,000.00 0.171 - - - - - - -
2 Instalasi titik lampu NYM 3x2,5 mm2 + PVC high impact conduit Ø 20 (Item Baru) titik 285,262.45 - - 30.00 8,557,873.50 0.065
- - - - - - -
mm
13
JENIS PEKERJAAN : Biaya Penyelenggara SMK3 MINGGU
SATUAN PEMBAYAR : Ls XXI
URAIAN ANALISA HARGA SATUAN
KEMAJUAN PEKERJAAN
JUMLAH HARGA PENYELESAIAN PEK. s/d PENYELESAIAN PEK. PENYELESAIAN PEK. s/d Bobot
PERKIRAAN HARGA SATUAN BOBOT MINGGU LALU MINGGU INI MINGGU INI Terhadap
No URAIAN SAT (%) Kontrak
KUANTITAS (Rp)
(Rp) [%]
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 200,450,000.00 100.00 60.34 29.38 89.72
14
REKAPITULASI LAPORAN MINGGUAN
1 2 4 4 5 6 7 8 9
I PEKERJAAN PERSIAPAN 1.7940 1.7989 1.8932 1.8932 1.7272 0.1661 1.8932 100.00
II PEKERJAAN STRUKTUR 68.5164 70.2150 73.8759 66.0052 64.2397 1.7655 66.0052 89.35
II.1 PEKERJAAN TANAH 1.2776 0.5727 1.2753 1.2859 1.2859 - 0.0000 1.2859 100.83
II.1A PEKERJAAN LANTAI - 2.0312 2.0446 2.0446 1.8665 0.1781 2.0446 100.00
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 24.0566 25.5935 23.2968 23.1694 23.1694 - 0.0000 23.1694 99.45
II.2.1 PEKERJAAN PONDASI DALAM 14.5831 16.1200 15.4325 15.4325 15.4325 - 0.0000 15.4325 100.00
II.2.2 PEKERJAAN BETON PILE CAP 2.8656 2.8656 3.1219 3.1219 3.1219 - 0.0000 3.1219 100.00
II.2.3 PEKERJAAN BETON SLOOF 6.6080 6.6080 4.7424 4.6150 4.6150 - 0.0000 4.6150 97.31
II.3 PEKERJAAN BETON STRUKTUR ATAS 43.1822 42.0175 47.2591 39.5052 37.9178 1.5874 39.5052 83.59
II.3.1 BETON KOLOM PEDESTAL 2.5382 2.1986 2.8610 2.9243 2.9243 - 0.0000 2.9243 102.21
II.3.2 ELEVASI ± 0.00 6.6478 6.6478 8.5240 7.6301 7.4060 0.2241 7.6301 89.51
II.3.3 ELEVASI + 2.00 0.0807 0.0807 0.0463 0.0463 0.0463 - 0.0000 0.0463 100.00
II.3.5 ELEVASI + 4.50 15.4527 14.6275 17.2176 13.5133 12.1500 1.3633 13.5133 78.48
II.3.6 ELEVASI + 8.00 3.1040 3.1040 - - - - -
II.3.7 ELEVASI + 8.50 4.4902 4.4902 4.4131 3.8789 3.8789 - 0.0000 3.8789 87.89
II.3.8 ELEVASI + 11.00 4.4249 4.4249 5.1605 3.2046 3.2046 - 0.0000 3.2046 62.10
II.3.9 ELEVASI + 11.50 6.4438 6.4438 9.0365 8.3078 8.3078 - 0.0000 8.3078 91.94
III PEKERJAAN ARSITEKTUR 29.0511 27.3476 23.5919 30.1389 8.7533 20.1990 28.9523 122.72
III.1 LANTAI SATU 0.5562 0.7575 0.8729 3.1655 0.2409 1.9126 2.1535 246.72
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.4259 0.6272 0.7910 3.0836 0.2409 1.9126 2.1535 343.38
III.1.2 PEKERJAAN TANGGA 0.1304 0.1304 0.0819 0.0819 - - - -
III.2 FINISHING LUAR GEDUNG 28.4949 26.5901 22.7190 26.9734 8.5124 - 26.7988 117.96
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 11.9513 11.9513 7.7275 10.8918 2.8659 - 12.9728 108.55
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 10.7750 10.7750 8.8044 9.7106 1.4703 - 7.7037 71.50
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 5.7686 3.8637 6.1871 6.3710 4.1762 - 6.1223 158.45
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.6385 0.6385 0.6385 1.9627 0.1194 - 0.3232 50.61
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.0416 0.0416 0.0416 0.0416 - - - -
IV.1.1 SHAFT PIPA 0.0416 0.0416 0.0416 0.0416 - - - -
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.1958 0.1958 0.1958 0.1925 0.0357 - 0.0652 33.32
IV.2.1 SHAFT PIPA 0.0515 0.0515 0.0515 0.0136 - - - -
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.0807 0.0807 0.0807 0.0759 0.0357 - 0.0652 80.82
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.0636 0.0636 0.0636 0.0440 - - - -
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.0590 -
IV.3 INSTALASI PEMPIPAAN AIR HUJAN 0.4011 0.4011 0.4011 1.7286 0.0837 - 0.2579 64.31
IV.3.1 PIPA TEGAK 0.0837 0.0837 0.0837 0.2579 0.0837 - 0.2579 308.14
IV.3.2 LANTAI DAK FFL. ±12.000 0.0546 0.0546 0.0546 0.0074 - - - -
IV.3.3 LANTAI DAK FFL. ±8.000 0.0740 0.0740 0.0740 0.0058 - - - -
IV.3.4 LANTAI DUA 0.0740 0.0740 0.0740 - - - - -
IV.3.5 LANTAI SATU 0.1148 0.1148 0.1148 0.0584 - - - -
IV.3.6 LANTAI DAK FFL. ±14.50 0.0451 - - -
IV.4 LAMPU & INST. PENERANGAN &STOP KONTAK 0.9398 - - -
IV.5 PEKERJAAN PENANGKAL PETIR 0.4141 - - -
100.000 100.000 100.000 100.000 74.8395 22.1305 97.1738
Rencana Komulatif Bobot Per Minggu 100.0000
Realisasi Komulatif Bobot Per Minggu 97.1738
Deviasi 2.8262 [ LAMBAT ]
Page 15 of 89
LAPORAN MINGGUAN
II.1A PEKERJAAN LANTAI 269,353,928.41 2.045 269,353,928.41 2.045 1.866 0.178 2.045
2 Pek. Pengurugan dengan Tanah Urug m3 176,710.00 1,524.27 269,353,928.41 2.045 1,524.27 269,353,928.41 2.045 1,391.48 1.866 132.79 0.178 1,524.27 2.045 100.00
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 3,052,309,959.81 23.169 3,052,309,959.81 23.169 23.169 - 23.169
Data Pondasi
- Pondasi Tiang Pancang Mini Pile 25x25 cm
- Mutu Beton Tiang Pancang K-450
- Kedalaman Pondasi ± 18.5 meter dari MT asli
- Jenis dan Jumlah Pile Cap
Type F1/1 Pile 10 ttk
Type F2/2 Pile 8 ttk
Type F4/4 Pile 24 ttk
Type F6/6 Pile 16 ttk
Type F1K/1 Pile 29 ttk
Type F2K/2 Pile 2 ttk
II.2.1 PEKERJAAN PONDASI DALAM 2,033,055,000.00 15.432 2,033,055,000.00 15.432 15.432 - 15.432
1 Pek. Mobilisasi dan Demobilisasi Alat Pancang 100,000,000.00 2.00 200,000,000.00 1.518 2.00 200,000,000.00 1.518 2.00 1.518 - - 2.00 1.518 100.00
2 Pengadaan Tiang Pancang Mini Pile 25x25 cm 255,000.00 4,950.00 1,262,250,000.00 9.581 4,950.00 1,262,250,000.00 9.581 4,950.00 9.581 - - 4,950.00 9.581 100.00
3 Sambungan Tiang Pancang Mini Pile 25x25 cm 125,000.00 565.00 70,625,000.00 0.536 565.00 70,625,000.00 0.536 565.00 0.536 - - 565.00 0.536 100.00
4 Penurunan dan handling tiang pancang Mini Pile 25x25 cm 15,000.00 4,896.00 73,440,000.00 0.557 4,896.00 73,440,000.00 0.557 4,896.00 0.557 - - 4,896.00 0.557 100.00
5 Pemancangan Tiang Pancang Mini Pile 25x25 cm 65,000.00 4,896.00 318,240,000.00 2.416 4,896.00 318,240,000.00 2.416 4,896.00 2.416 - - 4,896.00 2.416 100.00
6 Pengelasan Sambungan Tiang Pancang Mini Pile 25x25 cm 90,000.00 565.00 50,850,000.00 0.386 565.00 50,850,000.00 0.386 565.00 0.386 - - 565.00 0.386 100.00
7 Pek. Pemotongan Tiang Pancang beikut buang ke luar lokasi proyek 150,000.00 251.00 37,650,000.00 0.286 251.00 37,650,000.00 0.286 251.00 0.286 - - 251.00 0.286 100.00
8 Test PDA 20,000,000.00 1.00 20,000,000.00 0.152 1.00 20,000,000.00 0.152 1.00 0.152 - - 1.00 0.152 100.00
II.2.2 PEKERJAAN BETON PILE CAP 411,280,713.26 3.122 411,280,713.26 3.122 3.122 - 3.122
1 Pile Cap Type F1/1 Pile Bangunan Utama 16,607,015.45 0.126 16,607,015.45 0.126 0.126 - 0.126
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 0.48 111,693.04 0.001 0.48 111,693.04 0.001 0.48 0.001 - - 0.48 0.001 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 0.48 447,937.99 0.003 0.48 447,937.99 0.003 0.48 0.003 - - 0.48 0.003 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 25.50 4,424,760.00 0.034 25.50 4,424,760.00 0.034 25.50 0.034 - - 25.50 0.034 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 171.29 2,283,240.97 0.017 171.29 2,283,240.97 0.017 171.29 0.017 - - 171.29 0.017 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 259.46 3,458,637.20 0.026 259.46 3,458,637.20 0.026 259.46 0.026 - - 259.46 0.026 100.00
f. Pek. Beton K-300 m2 1,229,960.00 4.78 5,880,746.25 0.045 4.78 5,880,746.25 0.045 4.78 0.045 - - 4.78 0.045 100.00
16
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
2 Pile Cap Type F2/2 Pile 31,184,942.45 0.237 31,184,942.45 0.237 0.237 - 0.237
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 1.24 285,934.18 0.002 1.24 285,934.18 0.002 1.24 0.002 - - 1.24 0.002 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 1.24 1,146,721.25 0.009 1.24 1,146,721.25 0.009 1.24 0.009 - - 1.24 0.009 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 36.72 6,371,654.40 0.048 36.72 6,371,654.40 0.048 36.72 0.048 - - 36.72 0.048 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 303.40 4,044,280.84 0.031 303.40 4,044,280.84 0.031 303.40 0.031 - - 303.40 0.031 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 321.20 4,281,641.39 0.033 321.20 4,281,641.39 0.033 321.20 0.033 - - 321.20 0.033 100.00
f. Pek. Beton K-300 m2 1,229,960.00 12.24 15,054,710.40 0.114 12.24 15,054,710.40 0.114 12.24 0.114 - - 12.24 0.114 100.00
3 Pile Cap Type F4/4 Pile 125,882,883.70 0.956 125,882,883.70 0.956 0.956 - 0.956
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 1,072,253.16 0.008 4.64 1,072,253.16 0.008 4.64 0.008 - - 4.64 0.008 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 4,300,204.68 0.033 4.64 4,300,204.68 0.033 4.64 0.033 - - 4.64 0.033 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 122.40 21,238,848.00 0.161 122.40 21,238,848.00 0.161 122.40 0.161 - - 122.40 0.161 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 3,212.03 42,816,413.86 0.325 3,212.03 42,816,413.86 0.325 3,212.03 0.325 - - 3,212.03 0.325 100.00
e. Pek. Beton K-300 m2 1,229,960.00 45.90 56,455,164.00 0.429 45.90 56,455,164.00 0.429 45.90 0.429 - - 45.90 0.429 100.00
4 Pile Cap Type F6/6 Pile 140,260,562.57 1.065 140,260,562.57 1.065 1.065 - 1.065
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 1,072,253.16 0.008 4.64 1,072,253.16 0.008 4.64 0.008 - - 4.64 0.008 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 4,300,204.68 0.033 4.64 4,300,204.68 0.033 4.64 0.033 - - 4.64 0.033 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 102.00 17,699,040.00 0.134 102.00 17,699,040.00 0.134 102.00 0.134 - - 102.00 0.134 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 1,906.51 25,413,830.55 0.193 1,906.51 25,413,830.55 0.193 1,906.51 0.193 - - 1,906.51 0.193 100.00
e. Pek. Pembesian ɸ 22 kg 13,330.00 2,649.67 35,320,070.17 0.268 2,649.67 35,320,070.17 0.268 2,649.67 0.268 - - 2,649.67 0.268 100.00
f. Pek. Beton K-300 m2 1,229,960.00 45.90 56,455,164.00 0.429 45.90 56,455,164.00 0.429 45.90 0.429 - - 45.90 0.429 100.00
5 Pile Cap Type FK 1 / 1 Pile 90,465,147.28 0.687 90,465,147.28 0.687 0.687 - 0.687
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 3.59 829,209.11 0.006 3.59 829,209.11 0.006 3.59 0.006 - - 3.59 0.006 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 3.59 3,325,491.62 0.025 3.59 3,325,491.62 0.025 3.59 0.025 - - 3.59 0.025 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 118.32 20,530,886.40 0.156 118.32 20,530,886.40 0.156 118.32 0.156 - - 118.32 0.156 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 659.89 8,796,310.82 0.067 659.89 8,796,310.82 0.067 659.89 0.067 - - 659.89 0.067 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 999.59 13,324,589.17 0.101 999.59 13,324,589.17 0.101 999.59 0.101 - - 999.59 0.101 100.00
f. Pek. Beton K-300 m2 1,229,960.00 35.50 43,658,660.16 0.331 35.50 43,658,660.16 0.331 35.50 0.331 - - 35.50 0.331 100.00
6 Pile Cap Type FK 2 / 2 Pile 6,880,161.82 0.052 6,880,161.82 0.052 0.052 - 0.052
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 0.26 59,569.62 0.000 0.26 59,569.62 0.0005 0.26 0.000 - - 0.26 0.000 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 0.26 238,900.26 0.002 0.26 238,900.26 0.002 0.26 0.002 - - 0.26 0.002 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 8.50 1,474,920.00 0.011 8.50 1,474,920.00 0.011 8.50 0.011 - - 8.50 0.011 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 67.51 899,963.59 0.007 67.51 899,963.59 0.007 67.51 0.007 - - 67.51 0.007 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 80.30 1,070,410.35 0.008 80.30 1,070,410.35 0.008 80.30 0.008 - - 80.30 0.008 100.00
f. Pek. Beton K-300 m2 1,229,960.00 2.55 3,136,398.00 0.024 2.55 3,136,398.00 0.024 2.55 0.024 - - 2.55 0.024 100.00
II.2.3 PEKERJAAN BETON SLOOF 607,974,246.55 4.615 607,974,246.55 4.615 4.615 - 4.615
1 Pek. Beton Sloof BS 30x60 cm 408,874,572.76 3.104 408,874,572.76 3.104 3.104 - 3.104
a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 4.60 378,031.12 0.003 4.60 378,031.12 0.003 4.60 0.003 - - 4.60 0.003 100.00
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - - -
c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - - -
d. Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 643.98 115,021,267.80 0.873 643.98 115,021,267.80 0.873 643.98 0.873 - - 643.98 0.873 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 10,110.84 134,777,453.69 1.023 10,110.84 134,777,453.69 1.023 10,110.84 1.023 - - 10,110.84 1.023 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 4,774.90 63,649,463.26 0.483 4,774.90 63,649,463.26 0.483 4,774.90 0.483 - - 4,774.90 0.483 100.00
- Pek. Beton K-300 m3 1,229,960.00 77.28 95,048,356.90 0.721 77.28 95,048,356.90 0.721 77.28 0.721 - - 77.28 0.721 100.00
2 Pek. Beton Sloof BS 40x70 cm 162,937,193.63 1.237 162,937,193.63 1.237 1.237 - 1.237
a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 0.57 46,536.52 0.0004 0.57 46,536.52 0.0004 0.57 0.000 - - 0.57 0.000 100.00
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - - -
c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - - -
d. Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 211.82 37,833,170.20 0.287 211.82 37,833,170.20 0.287 211.82 0.287 - - 211.82 0.287 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 4,183.98 55,772,418.34 0.423 4,183.98 55,772,418.34 0.423 4,183.98 0.423 - - 4,183.98 0.423 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 1,436.01 19,142,059.29 0.145 1,436.01 19,142,059.29 0.145 1,436.01 0.145 - - 1,436.01 0.145 100.00
- Pek. Beton K-300 m3 1,229,960.00 40.77 50,143,009.28 0.381 40.77 50,143,009.28 0.381 40.77 0.381 - - 40.77 0.381 100.00
17
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
3a Pek. Beton Sloof BS 60x80 cm 36,162,480.16 0.275 36,162,480.16 0.275 0.275 - 0.275
a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 1.05 86,577.66 0.001 1.05 86,577.66 0.001 1.05 0.001 - - 1.05 0.001 100.00
d Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 49.69 8,874,416.46 0.067 49.69 8,874,416.46 0.067 49.69 0.067 - - 49.69 0.067 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 781.80 10,421,353.56 0.079 781.80 10,421,353.56 0.079 781.80 0.079 - - 781.80 0.079 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 184.36 2,457,494.27 0.019 184.36 2,457,494.27 0.019 184.36 0.019 - - 184.36 0.019 100.00
- Pek. Beton K-300 m3 1,229,960.00 11.64 14,322,638.21 0.109 11.64 14,322,638.21 0.109 11.64 0.109 - - 11.64 0.109 100.00
II.3 PEKERJAAN BETON STRUKTUR ATAS 5,204,355,779.37 39.505 5,204,355,779.37 39.505 37.918 1.587 39.505
II.3.1 BETON KOLOM PEDESTAL 385,237,688.60 2.924 385,237,688.60 2.924 2.924 - 2.924
1 Pek. Kolom K 40x40 cm 17,843,249.42 0.135 17,843,249.42 0.135 0.135 - 0.135
a. Pek. Bekisting Kolom m2 184,440.00 15.72 2,899,396.80 0.022 15.72 2,899,396.80 0.022 15.72 0.022 - - 15.72 0.022 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 - - - - - - - - - -
b1. Pek. Pembesian Ø 25 kg 13,330.00 924.75 12,326,917.50 0.094 924.75 12,326,917.50 0.094 924.75 0.094 - - 924.75 0.094 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 41.31 550,602.32 0.004 41.31 550,602.32 0.004 41.31 0.004 - - 41.31 0.004 100.00
d. Pek. Beton K-300 m3 1,229,960.00 1.68 2,066,332.80 0.016 1.68 2,066,332.80 0.016 1.68 0.016 - - 1.68 0.016 100.00
II.3.2 ELEVASI ± 0.00 1,005,178,494.49 7.630 1,005,178,494.49 7.630 7.406 0.224 7.630
BETON KOLOM (Elv ± 0.00 - Elv ± 4.50) 595,738,065.10 4.522 595,738,065.10 4.522 4.522 - 4.522
1 Pek. Kolom K 50x80 cm 24,505,448.93 0.186 24,505,448.93 0.186 0.186 - 0.186
a. Pek. Bekisting Kolom m2 184,440.00 22.41 4,133,300.40 0.031 22.41 4,133,300.40 0.031 22.41 0.031 - - 22.41 0.031 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 932.46 12,429,641.81 0.094 932.46 12,429,641.81 0.094 932.46 0.094 - - 932.46 0.094 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 263.66 3,514,650.72 0.027 263.66 3,514,650.72 0.027 263.66 0.027 - - 263.66 0.027 100.00
d. Pek. Beton K-300 m3 1,229,960.00 3.60 4,427,856.00 0.034 3.60 4,427,856.00 0.034 3.60 0.034 - - 3.60 0.034 100.00
18
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
a. Pek. Bekisting Kolom m2 184,440.00 343.72 63,395,716.80 0.481 343.72 63,395,716.80 0.481 343.72 0.481 - - 343.72 0.481 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 14,241.15 189,834,529.50 1.441 14,241.15 189,834,529.50 1.441 14,241.15 1.441 - - 14,241.15 1.441 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 3,624.19 48,310,471.68 0.367 3,624.19 48,310,471.68 0.367 3,624.19 0.367 - - 3,624.19 0.367 100.00
d. Pek. Beton K-300 m3 1,229,960.00 69.12 85,014,835.20 0.645 69.12 85,014,835.20 0.645 69.12 0.645 - - 69.12 0.645 100.00
BETON PLAT (Elv ± 0.00) 386,294,188.78 2.932 386,294,188.78 2.932 2.708 0.224 2.932
1 Pek. Beton Plat tbl 10 cm 386,294,188.78 2.932 386,294,188.78 2.932 2.708 0.224 2.932
a. Pek. Pembesian Wiremesh M6 (1 Lapis) m2 32,630.00 1,913.06 62,423,229.38 0.474 1,913.06 62,423,229.38 0.474 1,756.84 0.435 156.23 0.039 1,913.06 0.474 100.00
a1 Lantai Kerja Tbl 5cm m3 925,970.00 95.65 88,571,924.16 0.672 95.65 88,571,924.16 0.672 90.03 0.633 5.63 0.040 95.65 0.672 100.00
b. Pek. Beton K-300 m3 1,229,960.00 191.31 235,299,035.25 1.786 191.31 235,299,035.25 1.786 175.68 1.640 15.62 0.146 191.31 1.786 100.00
BETON TANGGA (Elv ± 0.00) 23,146,240.61 0.176 23,146,240.61 0.176 0.176 - 0.176
1 Pek. Beton Tangga 7,949,255.53 0.060 7,949,255.53 0.060 - 0.060 - - - 0.060
a. Pek. Bekisting tangga m2 178,800.00 16.20 2,896,560.00 0.022 16.20 2,896,560.00 0.022 16.20 0.022 - - 16.20 0.022 100.00
b. Pek. Pembesian Ø 10 kg 13,330.00 192.20 2,562,026.53 0.019 192.20 2,562,026.53 0.019 192.20 0.019 - - 192.20 0.019 100.00
c. Pek. Beton K-300 m3 1,229,960.00 2.03 2,490,669.00 0.019 2.03 2,490,669.00 0.019 2.03 0.019 - - 2.03 0.019 100.00
2 Pek. Beton Plat Tangga 15,196,985.08 0.115 15,196,985.08 0.115 0.115 - 0.115
a. Pek. Bekisting tangga m2 178,800.00 32.25 5,765,569.35 0.044 32.25 5,765,569.35 0.044 32.25 0.044 - - 32.25 0.044 100.00
b. Pek. Pembesian Ø 12 kg 13,330.00 121.45 1,618,869.42 0.012 121.45 1,618,869.42 0.012 121.45 0.012 - - 121.45 0.012 100.00
c. Pek. Pembesian Ø 16 kg 13,330.00 287.32 3,829,934.61 0.029 287.32 3,829,934.61 0.029 287.32 0.029 - - 287.32 0.029 100.00
d. Pek. Beton K-300 m3 1,229,960.00 3.24 3,982,611.69 0.030 3.24 3,982,611.69 0.030 3.24 0.030 - - 3.24 0.030 100.00
II.3.5 ELEVASI + 4.50 1,780,218,061.67 13.513 1,780,218,061.67 13.513 12.150 1.363 13.513
BETON BALOK (Elv + 4.50) 1,171,342,109.82 8.891 1,171,342,109.82 8.891 7.528 1.363 8.891
1 Pek. Balok B 30x60 cm 196,911,686.86 1.495 196,911,686.86 1.495 1.495 - 1.495
a. Pek. Bekisting Balok m2 185,810.00 292.63 54,373,580.30 0.413 292.63 54,373,580.30 0.413 292.63 0.413 - - 292.63 0.413 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 4,465.63 59,526,848.97 0.452 4,465.63 59,526,848.97 0.452 4,465.63 0.452 - - 4,465.63 0.452 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 2,374.20 31,648,127.99 0.240 2,374.20 31,648,127.99 0.240 2,374.20 0.240 - - 2,374.20 0.240 100.00
d. Pek. Beton K-300 m3 1,229,960.00 41.76 51,363,129.60 0.390 41.76 51,363,129.60 0.390 41.76 0.390 - - 41.76 0.390 100.00
3a B 80x80 (Bentang 12 m, grid G ke I) 291,283,450.82 2.211 291,283,450.82 2.211 0.848 1.363 2.211
a. Pek. Bekisting Balok m2 185,810.00 49.50 9,197,595.00 0.070 49.50 9,197,595.00 0.070 49.50 0.070 - - 49.50 0.070 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 1,510.54 20,135,437.91 0.153 1,510.54 20,135,437.91 0.153 1,510.54 0.153 - - 1,510.54 0.153 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 304.25 4,055,693.92 0.031 304.25 4,055,693.92 0.031 304.25 0.031 - - 304.25 0.031 100.00
d. Pek. Beton K-300 m3 1,229,960.00 14.40 17,711,424.00 0.134 14.40 17,711,424.00 0.134 14.40 0.134 - - 14.40 0.134 100.00
3b Fabrikasi dan Pemasangan struktur Balok Entrance IWF.300.150.6,5 kg 35,000.00 - - - - - - - - - -
3c Fabrikasi dan Pemasangan struktur Baja IWF.300.150.5,5.8 Depan kg 35,000.00 3,402.92 119,102,287.50 0.904 3,402.92 119,102,287.50 0.904 865.55 0.230 2,537.37 0.674 3,402.92 0.904 100.00
3d Fabrikasi dan Pemasangan struktur Baja IWF.300.150.5,5.8 Belakang kg 35,000.00 3,459.46 121,081,012.50 0.919 3,459.46 121,081,012.50 0.919 865.55 0.230 2,593.91 0.689 3,459.46 0.919 100.00
19
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
d. Pek. Beton K-300 m3 1,229,960.00 9.24 11,367,413.32 0.086 9.24 11,367,413.32 0.086 9.24 0.086 - - 9.24 0.086 100.00
BETON KOLOM (Elv + 4.50 - Elv ± 8,50 dan ± 9,50) Grid A-D, Kelas 228,891,048.15 1.737 228,891,048.15 1.737 1.737 - 1.737
1 Pek. Kolom K 50x80 cm 19,767,328.52 0.150 19,767,328.52 0.150 0.150 - 0.150
a. Pek. Bekisting Kolom m2 184,440.00 19.50 3,596,580.00 0.027 19.50 3,596,580.00 0.027 19.50 0.027 - - 19.50 0.027 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 678.15 9,039,739.50 0.069 678.15 9,039,739.50 0.069 678.15 0.069 - - 678.15 0.069 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 239.70 3,195,137.02 0.024 239.70 3,195,137.02 0.024 239.70 0.024 - - 239.70 0.024 100.00
d. Pek. Beton K-300 m3 1,229,960.00 3.20 3,935,872.00 0.030 3.20 3,935,872.00 0.030 3.20 0.030 - - 3.20 0.030 100.00
BETON PLAT (Elv + 4.50) 379,984,903.69 2.884 379,984,903.69 2.884 2.884 - 2.884
1 Pek. Beton plat tbl 12 cm 379,984,903.69 2.884 379,984,903.69 2.884 2.884 - 2.884
a. Pek. Bekisting Plat m2 217,440.00 630.33 137,058,422.47 1.040 630.33 137,058,422.47 1.040 630.33 1.040 - - 630.33 1.040 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 11,244.80 149,893,160.41 1.138 11,244.80 149,893,160.41 1.138 11,244.80 1.138 - - 11,244.80 1.138 100.00
c. Pek. Beton K-300 m3 1,229,960.00 75.64 93,033,320.81 0.706 75.64 93,033,320.81 0.706 75.64 0.706 - - 75.64 0.706 100.00
20
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
b. Pek. Pembesian Ø 16 kg 13,330.00 6,861.75 91,467,069.02 0.694 6,861.75 91,467,069.02 0.694 6,861.75 0.694 - - 6,861.75 0.694 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,510.85 60,129,638.52 0.456 4,510.85 60,129,638.52 0.456 4,510.85 0.456 - - 4,510.85 0.456 100.00
d. Pek. Beton K-300 m3 1,229,960.00 49.58 60,985,229.68 0.463 49.58 60,985,229.68 0.463 49.58 0.463 - - 49.58 0.463 100.00
BETON PLAT (Elv + 8.50) 140,239,707.83 1.065 140,239,707.83 1.065 1.065 - 1.065
1 Pek. Beton Plat tbl 10 cm 140,239,707.83 1.065 140,239,707.83 1.065 1.065 - 1.065
a. Pek. Bekisting plat m2 217,440.00 244.89 53,248,881.60 0.404 244.89 53,248,881.60 0.404 244.89 0.404 - - 244.89 0.404 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 4,266.34 56,870,335.79 0.432 4,266.34 56,870,335.79 0.432 4,266.34 0.432 - - 4,266.34 0.432 100.00
c. Pek. Beton K-300 m3 1,229,960.00 24.49 30,120,490.44 0.229 24.49 30,120,490.44 0.229 24.49 0.229 - - 24.49 0.229 100.00
BETON BALOK (Elv + 11.00) 102,986,567.88 0.782 102,986,567.88 0.782 0.782 - 0.782
1 Pek. Balok B 30x60 cm - - - -
a. Pek. Bekisting Balok m2 185,810.00 - - - - - -
b. Pek. Pembesian Ø 16 kg 13,330.00 - - - - - -
c. Pek. Pembesian Ø 10 kg 13,330.00 - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - -
BETON PLAT (Elv + 11.00) 51,654,847.75 0.392 51,654,847.75 0.392 0.392 - 0.392
1 Pek. Beton Plat tbl 10 cm 51,654,847.75 0.392 51,654,847.75 0.392 0.392 - 0.392
a. Pek. Bekisting plat m2 217,440.00 61.34 13,338,639.36 0.101 61.34 13,338,639.36 0.101 61.34 0.101 - - 61.34 0.101 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 2,308.41 30,771,141.77 0.234 2,308.41 30,771,141.77 0.234 2,308.41 0.234 - - 2,308.41 0.234 100.00
c. Pek. Beton K-300 m3 1,229,960.00 6.13 7,545,066.62 0.057 6.13 7,545,066.62 0.057 6.13 0.057 - - 6.13 0.057 100.00
21
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
BETON BALOK (Elv + 11.50) 387,471,975.03 2.941 387,471,975.03 2.941 2.941 - 2.941
1 Pek. Balok B 35x70 cm 300,191,172.95 2.279 300,191,172.95 2.279 2.279 - 2.279
a. Pek. Bekisting Balok m2 185,810.00 310.21 57,639,191.05 0.438 310.21 57,639,191.05 0.438 310.21 0.438 - - 310.21 0.438 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 6,452.67 86,014,035.18 0.653 6,452.67 86,014,035.18 0.653 6,452.67 0.653 - - 6,452.67 0.653 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 3,442.70 45,891,161.27 0.348 3,442.70 45,891,161.27 0.348 3,442.70 0.348 - - 3,442.70 0.348 100.00
d. Pek. Beton K-300 m3 1,229,960.00 43.43 53,415,563.85 0.405 43.43 53,415,563.85 0.405 43.43 0.405 - - 43.43 0.405 100.00
1a Fabrikasi dan Pemasangan Struktur Baja IWF 350.175.6,9 kg 35,000.00 1,635.18 57,231,221.60 0.434 1,635.18 57,231,221.60 0.434 1,635.18 0.434 - - 1,635.18 0.434 100.00
BETON PLAT (Elv + 11.50) 171,372,925.74 1.301 171,372,925.74 1.301 1.301 - 1.301
1 Pek. Beton Plat tbl 10 cm 171,372,925.74 1.301 171,372,925.74 1.301 1.301 - 1.301
a. Pek. Bekisting plat m2 217,440.00 302.82 65,844,202.32 0.500 302.82 65,844,202.32 0.500 302.82 0.500 - - 302.82 0.500 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 5,122.55 68,283,628.18 0.518 5,122.55 68,283,628.18 0.518 5,122.55 0.518 - - 5,122.55 0.518 100.00
c. Pek. Beton K-300 m3 1,229,960.00 30.28 37,245,095.24 0.283 30.28 37,245,095.24 0.283 30.28 0.283 - - 30.28 0.283 100.00
III PEKERJAAN ARSITEKTUR 3,970,460,706.10 30.139 3,970,460,706.87 30.139 14.181 14.771 28.952
III.1 LANTAI SATU 417,023,516.32 3.166 320,796,416.41 2.435 1.298 0.855 2.154
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 406,233,930.07 3.084 310,006,830.16 2.353 1.298 0.855 2.154
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I Posisi : Dibawah
1.a m2 350,651.00 80.86 28,352,237.26 0.215 80.86 28,352,237.26 0.215 64.68 0.172 16.17 0.043 80.86 0.215 100.00
Curtain Wall
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I Posisi : Area Café dan
1.b m2 350,651.00 317.53 111,340,497.19 0.845 317.53 111,340,497.19 0.845 242.51 0.645 - - 242.51 0.645 76.37
Teras Belakang
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Unpolish Type I Posisi : Area Carport
1.c m2 350,651.00 360.00 126,234,360.00 0.958 360.00 126,234,360.00 0.958 90.00 0.240 270.00 0.719 360.00 0.958 100.00
Depan
2 Pek. Urugan Pasir tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 230,890.00 3.11 717,698.48 0.005 3.11 717,698.48 0.005 3.11 0.005 - - 3.11 0.005 100.00
3 Pek. Lantai kerja tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 925,970.00 3.11 2,878,285.15 0.022 3.11 2,878,285.15 0.022 3.11 0.022 - - 3.11 0.022 100.00
4 Pek. Pasangan Rollag 1 Bata m2 229,460.00 102.48 23,515,060.80 0.178 102.48 23,515,060.80 0.178 102.48 0.178 - - 102.48 0.178 100.00
5 Pek. Plesteran 1:4 m2 45,160.00 102.48 4,627,996.80 0.035 102.48 4,627,996.80 0.035 102.48 0.035 - - 102.48 0.035 100.00
6 Ramp Depan
a Pek. Tanah Timbun m3 176,710.00 55.97 9,890,105.28 0.075 - - - - - - - - - -
a1 Pek. Tanah Timbun m3 32,890.00 - - - 31.85 1,047,546.50 0.008 - - 31.85 0.008 31.85 0.008 100.00
b Pek. Wiremesh M6 kg 32,630.00 136.08 4,440,290.40 0.034 - - - - - - - - - -
b1. Pek. Wiremesh M6 kg 32,630.00 - - - 63.70 2,078,531.00 0.016 - - 63.70 0.016 63.70 0.016 100.00
c Pek. Beton K300 m3 1,229,960.00 68.04 83,686,478.40 0.635 7.49 9,214,616.99 0.070 - - 7.49 0.070 7.49 0.070 100.00
d Pek. Pas 1/2 Bata untuk Cansteen m2 117,100.00 14.45 1,691,860.80 0.013 - - - - - - - - - -
e Pek. Plesteran 1:4 m2 45,160.00 14.45 652,471.68 0.005 - - - - - - - - - -
f Pek. Besi Siku 40.40.4 kg 13,330.00 615.65 8,206,587.84 0.062 - - - - - - - - - -
III.2 FINISHING LUAR GEDUNG 3,553,437,189.79 26.973 3,649,664,290.46 27.704 12.883 13.916 26.799
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 1,434,871,225.63 10.892 1,821,336,968.75 13.825 3.750 9.223 12.973
1 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium
skin 0.3 mm tkdn 61%
a Posisi : Tampak Luar Bangunan pada kolom dan balok silang m2 595,180.00 1,662.41 989,430,207.90 7.511 1,906.86 1,134,925,264.91 8.615 384.30 1.736 1,522.57 6.879 1,906.86 8.615 100.00
b Posisi : leher atap dan background logo m2 595,180.00 407.20 242,357,296.00 1.840 854.38 508,507,507.68 3.860 285.91 1.292 463.02 2.092 748.93 3.384 87.66
22
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
c Posisi : Keliling sisi samping atap m2 595,180.00 25.25 15,027,104.64 0.114 69.30 41,245,974.00 0.313 - - - - - - -
d Posisi : Plafond Atap m2 595,180.00 - - - - - - - - - - - - -
2 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm m2 595,180.00 226.00 134,510,680.00 1.021 139.64 83,112,285.07 0.631 69.82 0.315 55.86 0.252 125.68 0.568 90.00
3 Pek. Pemasangan 1/2 Bata
a Posisi : Elev + 8.50 m2 117,100.00 46.51 5,446,344.42 0.041 46.51 5,446,344.42 0.041 46.51 0.041 - - 46.51 0.041 100.00
b Posisi : Elev + 11.50 m2 117,100.00 63.84 7,475,734.26 0.057 63.84 7,475,734.26 0.057 63.84 0.057 - - 63.84 0.057 100.00
c Posisi : Elev + 11.50 Bentang 18 m ( I.3-I7A dan G3- G7A) m2 117,100.00 77.11 9,029,815.20 0.069 77.11 9,029,815.20 0.069 77.11 0.069 - - 77.11 0.069 100.00
4 Pek. Plesteran m1 45,160.00 187.46 8,465,820.05 0.064 187.46 8,465,820.05 0.064 187.46 0.064 - - 187.46 0.064 100.00
5 Pek. Balok Latei Penahan Bata
a Pek. Bekisting Balok m2 185,810.00 23.49 4,363,896.50 0.033 23.49 4,363,896.50 0.033 23.49 0.033 - - 23.49 0.033 100.00
b Pek. Pembesian Ø 8 kg 13,330.00 142.56 1,900,357.05 0.014 142.56 1,900,357.05 0.014 142.56 0.014 - - 142.56 0.014 100.00
c Pek. Pembesian Ø 6 kg 13,330.00 955.24 12,733,342.87 0.097 955.24 12,733,342.87 0.097 955.24 0.097 - - 955.24 0.097 100.00
d Pek. Beton K =175 m3 925,970.00 1.54 1,425,927.13 0.011 1.54 1,425,927.13 0.011 1.54 0.011 - - 1.54 0.011 100.00
6 Pek. Kolom Praktis Penahan Bata
a Pek. Bekisting Balok m2 184,440.00 3.12 575,452.80 0.004 3.12 575,452.80 0.004 3.12 0.004 - - 3.12 0.004 100.00
b Pek. Pembesian Ø 8 kg 13,330.00 18.94 252,476.31 0.002 18.94 252,476.31 0.002 18.94 0.002 - - 18.94 0.002 100.00
c Pek. Pembesian Ø 6 kg 13,330.00 126.90 1,691,576.54 0.013 126.90 1,691,576.54 0.013 126.90 0.013 - - 126.90 0.013 100.00
d Pek. Beton K =175 m3 925,970.00 0.20 185,193.96 0.001 0.20 185,193.96 0.001 0.20 0.001 - - 0.20 0.001 100.00
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 1,279,262,448.96 9.711 1,021,790,223.72 7.756 3.918 3.786 7.704
Lengkap dengan Accessories dan berfungsi dengan baik
1 Pek. Pengadaan dan Pemasangan Pintu Kaca 2 Daun (Frame less) Posisi : Lantai unit 5,540,700.00 2.00 11,081,400.00 0.084 2.00 11,081,400.00 0.084 1.00 0.042 - - 1.00 0.042 50.00
2 Pek. Pengadaan dan Pemasangan Pintu Kaca 1 Daun Posisi : Lantai 1 (Pintu Masuk) unit 2,750,340.00 1.00 2,750,340.00 0.021 1.00 2,750,340.00 0.021 0.50 0.010 - - 0.50 0.010 50.00
3 Pek. Curtain Wall type 1 - T = 11.50 m Posisi : area hall dll m2 804,122.00 1,064.10 855,666,220.20 6.495 850.62 683,998,235.03 5.192 413.55 2.524 437.07 2.668 850.62 5.192 100.00
4 Pek. Curtain Wall type 2 - T = 8.50 m Posisi : area kelas dll m2 804,122.00 509.58 409,764,488.76 3.110 402.87 323,960,248.69 2.459 219.76 1.341 183.12 1.118 402.87 2.459 100.00
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 839,303,515.20 6.371 806,537,098.00 6.122 5.215 0.908 6.122
Posisi : area atap area tengah
1 Pabrikasi dan pemasangan struktur Kolom rangka baja dan atap WF termasuk z kg 35,000.00 18,157.45 635,510,904.00 4.824 18,157.45 635,510,904.00 4.824 15,718.92 4.176 2,438.53 0.648 18,157.45 4.824 100.00
2 Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 l m2 207,144.00 722.30 149,620,111.20 1.136 - - - - - - - - - -
2a Pek. Penutup Atap AT Galvanium tebal 0,45 mm Griblock 75 cm Lengkap (Item baru) m2 161,780.00 - - - 722.30 116,853,694.00 0.887 577.84 0.710 144.46 0.18 722.30 0.887 100.00
3 Pek. Aluminium foil insulasi atap [thermal foam 5 mm] m2 75,000.00 722.30 54,172,500.00 0.411 722.30 54,172,500.00 0.411 577.84 0.329 144.46 0.08 722.30 0.411 100.00
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 258,560,814.05 1.963 258,560,814.05 1.963 0.284 1.150 1.433
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 5,484,600.00 0.042 5,484,600.00 0.042 - 0.042 0.042
IV.1.1 SHAFT PIPA 5,484,600.00 0.042 5,484,600.00 0.042 - 0.042 0.042
1 Pipa PPR PN-10 Dia. 2 Inci pada shaft Gedung Utama m' 365,640.00 15.00 5,484,600.00 0.042 15.00 5,484,600.00 0.042 - - 15.00 0.042 15.00 0.042 100.00
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 25,358,577.75 0.192 25,358,577.75 0.192 0.076 0.102 0.178
IV.2.1 SHAFT PIPA 1,796,008.50 0.014 1,796,008.50 0.014 - 0.014 0.014
1 PVC AW Dia.4 Inci Shaft Gedung Utama M' 128,227.00 9.00 1,154,043.00 0.009 9.00 1,154,043.00 0.009 - - 9.00 0.009 9.00 0.009 100.00
2 PVC AW Dia.3 Inci Shaft Gedung Utama M' 71,329.50 9.00 641,965.50 0.005 9.00 641,965.50 0.005 - - 9.00 0.005 9.00 0.005 100.00
3 PVC D Dia.3 Inci Shaft Gedung Utama M' 59,655.20 - - - - - - - - - - - - -
IV.2.2 LANTAI SATU GEDUNG UTAMA 9,994,701.75 0.076 9,994,701.75 0.076 0.036 0.030 0.065
1 PVC AW Dia.4 Inci M' 128,227.00 42.00 5,385,534.00 0.041 42.00 5,385,534.00 0.041 30.00 0.029 12.00 0.012 42.00 0.041 100.00
2 PVC AW Dia.3 Inci M' 71,329.50 45.00 3,209,827.50 0.024 45.00 3,209,827.50 0.024 12.00 0.006 33.00 0.018 45.00 0.024 100.00
3 PVC AW Dia.2 Inci M' 41,085.00 25.00 1,027,125.00 0.008 25.00 1,027,125.00 0.008 - - - - - - -
4 PVC D Dia.2 Inci M' 35,359.50 - - - - - - - - - - - - -
5 PVC D Dia.1,5 Inci M' 27,571.50 13.50 372,215.25 0.003 13.50 372,215.25 0.003 - - - - - - -
6 PVC D Dia.1,25 Inci M' 22,951.50 - - - - - - - - - - - - -
IV.2.3 LANTAI DUA GEDUNG UTAMA 5,795,328.00 0.044 5,795,328.00 0.044 0.040 - 0.040
1 PVC AW Dia.4 Inci M' 128,227.00 30.00 3,846,810.00 0.029 30.00 3,846,810.00 0.029 30.00 0.029 - - 30.00 0.029 100.00
2 PVC AW Dia.3 Inci M' 71,329.50 20.00 1,426,590.00 0.011 20.00 1,426,590.00 0.011 20.00 0.011 - - 20.00 0.011 100.00
3 PVC AW Dia.2 Inci M' 41,085.00 6.00 246,510.00 0.002 6.00 246,510.00 0.002 - - - - - - -
4 PVC D Dia.2 Inci M' 35,359.50 - - - - - - - - - - - - -
5 PVC D Dia.1,25 Inci M' 22,951.50 12.00 275,418.00 0.002 12.00 275,418.00 0.002 - - - - - - -
6 VENT CAP Dia.3 Inci Bh 175,000.00 - - - - - - - - - - - - -
IV.2.4 LANTAI TIGA GEDUNG UTAMA 7,772,539.50 0.059 7,772,539.50 0.059 - 0.059 0.059
1 Panel Penerangan (PP Lt.3) (Item Baru) Bh 7,772,539.50 1.00 7,772,539.50 0.059 1.00 7,772,539.50 0.059 - - 1.000 0.059 1.00 0.059 100.00
23
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16
IV.3 INSTALASI PEMIPAAN AIR HUJAN 49,359,309.00 0.375 49,359,309.00 0.375 0.084 0.260 0.344
IV.3.1 PIPA TEGAK 33,980,155.00 0.258 33,980,155.00 0.258 0.084 0.174 0.258
1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 265.00 33,980,155.00 0.258 265.00 33,980,155.00 0.258 86.00 0.084 179.00 0.174 265.00 0.258 100.00
IV.3.2 LANTAI DAK FFL. ±12.00 972,908.00 0.007 972,908.00 0.007 - 0.007 0.007
1 Roof Drain 4'' BH 115,000.00 4.00 460,000.00 0.003 4.00 460,000.00 0.003 - - 4.00 0.003 4.00 0.003 100.00
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 4.00 512,908.00 0.004 4.00 512,908.00 0.004 - - 4.00 0.004 4.00 0.004 100.00
IV.3.3 LANTAI DAK FFL. ±8.00 769,362.00 0.006 769,362.00 0.006 - 0.006 0.006
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 6.00 769,362.00 0.006 6.00 769,362.00 0.006 - - 6.00 0.006 6.00 0.006 100.00
IV.3.6 LANTAI DAK FFL. ±14.50 5,943,264.00 0.045 5,943,264.00 0.045 - 0.014 0.014
1 Roof Drain 4'' (Item Baru) BH 115,000.00 16.00 1,840,000.00 0.014 16.00 1,840,000.00 0.014 - - 16.00 0.014 16.00 0.014 100.00
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 32.00 4,103,264.00 0.031 32.00 4,103,264.00 0.031 - - - - - - -
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK 123,801,466.80 0.940 123,801,466.80 0.940 - 0.456 0.456
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 31,057,873.50 0.236 31,057,873.50 0.236 - 0.065 0.065
1 FREZA ARTNRL-225 18 Watt 3000K (Item Baru) buah 750,000.00 30.00 22,500,000.00 0.171 30.00 22,500,000.00 0.171 - - - - - - -
2 (Item Baru) titik 285,262.45 30.00 8,557,873.50 0.065 30.00 8,557,873.50 0.065
Instalasi titik lampu NYM 3x2,5 mm2 + PVC high impact conduit Ø 20 mm - - 30.00 0.065 30.00 0.065 100.00
IV.5 PEKERJAAN PENANGKAL PETIR 54,556,860.50 0.414 54,556,860.50 0.414 0.124 0.290 0.414
IV.5.1 GEDUNG UTAMA (Pengadaan dan pemasangan peralatan penangkal petir) 54,556,860.50 0.414 54,556,860.50 0.414 0.124 0.290 0.414
1 Tipe elektrostatik Radius 85 M (Item Baru) set 37,056,860.50 1.00 37,056,860.50 0.281 1.00 37,056,860.50 0.281 0.30 0.084 0.70 0.197 1.00 0.281 100.00
2 Grounding termasuk Cooper Max 2 ohm, Cooper Rood dan bak kontrol (Item Baru) set 17,500,000.00 1.00 17,500,000.00 0.133 1.00 17,500,000.00 0.133 0.30 0.040 0.70 0.093 1.00 0.133 100.00
THOMAS LARFO DIMEIRA, S.T DEKO FAHRUZI, ST CHOIRUS SUBECHAN, S.T., M.Si. Ir. MULYADI TANJUNG, M.T.
NIP. 19790529 200604 1 006 NIP. 19870405 201102 1 002 Team Leader Project Manager
24
SKETSA PEKERJAAN (ACP)
ANALISA PERHITUNGAN
NO URAIAN PEKERJAAN
Sub Jumlah (I
a. Jumlah (I-I
NO URAIAN PEKERJAAN
Grid
3
7A
Sub Jumlah (I
Dikurangi Sisi Bagian Kolom (80.60)
SKETSA PEKERJAAN (ACP)
ANALISA PERHITUNGAN
I II III = I x II IV V
I II III = I x II IV V
ANALISA PERHITUNGAN
Panjang Tinggi
NO URAIAN PEKERJAAN
M' M'
Pek. Curtain Wall type 1 - T = 11.50 m
3 I II
Posisi : area hall dll
Area Hall = Grid E - K
K3A – J3 5.10 11.5
J3 – I3 5.50 11.5
I3 – G3 10.92 11.5
GA – F3 5.16 11.5
F3 – E3A 5.00 11.5
K7 – K5+ 4.78 11.5
K5+ – K5- 5.12 11.5
K5- – K3A 4.56 11.5
K7 – J7A 5.43 11.5
J7A – I7A 5.40 11.5
I7A – G7A 11.40 11.5
G7A – F7A 5.40 11.5
F7A – E7 5.43 11.5
E7 – E5+ 4.80 3.00
E5+ – E5- 5.40 3.00
E5- – E3A 4.80 3.00
Sub Jumlah (I)
Pengurangan CW (Pintu depan-belakang) 5.40 2.60
Pengurangan CW (Pintu samping) 1.20 2.45
Pengurangan CW (ACP Sirip antar kolom area Hall depan-belakang) 7.20 12.00
Pengurangan CW (ACP Sirip antar kolom area Hall kiri) 1.80 11.50
Pengurangan CW (ACP Sirip antar kolom area Hall kanan elv +8.50) 1.80 3.00
Sub Jumlah (II)
a. Jumlah (I-II)
1068.300
Panjang Tinggi
NO URAIAN PEKERJAAN
M' M'
Pek. Curtain Wall type 1 - T = 8.50 m
3 I II
Posisi : area kelas dll
Area Kelas = Grid A - E
E3 – D3 5.70 9.30
D3 – C3 5.10 9.30
C3 – B4 5.00 9.30
B4 – A4 4.97 9.30
A4 – A5- 2.92 9.30
A5- – A5+ 2.97 9.30
A5+ – A6 2.97 9.30
E7 – D7 5.40 9.30
D7 – C7 5.00 9.30
C7 – B6 5.50 9.30
B6 – A6 5.50 9.30
Sub Jumlah (I)
Pengurangan CW (ACP Sirip antar kolom area Kelas depan-belakang) 6.00 9.30
Pengurangan CW (ACP Sirip antar kolom area Kall kanan) 1.80 3.00
Sub Jumlah (II)
a. Jumlah (I-II)
Volume
Progress PK 1 - 50 HK Keterangan
M²
III = I - II IV V
58.650 58.650
63.250 63.250
125.580 125.580 T. Depan
59.340 59.340
57.500 57.500
54.970 54.970
58.880 58.880 T. Kiri
T. Kiri
52.440 52.440
62.445 0.000
62.100 0.000
131.100 0.000 T. Belakang 131.100
62.100 0.000
62.445 0.000
14.400 0.000 T. Kanan 14.400
16.200 0.000 Elevasi 16.200
14.400 0.000 (+)8.50 14.400
955.800 530.610 Vol. Kotor 176.100
14.040 7.020 (-) Pintu
2.940 2.940 (-) Pintu
86.400 86.400 (-) ACP
20.700 20.700 (-) ACP
5.400 0.000 (-) ACP
129.480 117.060 (-) Total
826.320 413.550 Vol. Bersih
112.500
938.820
Volume
Progress PK 1 - 50 HK Keterangan
M²
III = I - II IV V
53.010 53.010
47.430 47.430
T. Depan
46.500 46.500
46.221 46.221
27.156 27.156
27.621 27.621 T. Kanan
27.621 27.621
50.220
46.500
T. Belakang
51.150
51.150
474.579 275.559 Vol. Kotor
55.800 55.800 (-) ACP
5.400 0.000 (-) ACP
61.200 55.800 (-) Total
413.379 219.759 Vol. Bersih
JENIS PEKERJAAN : Biaya Penyelenggara SMK3 MINGGU
SATUAN PEMBAYAR : Ls XXII
URAIAN ANALISA HARGA SATUAN
KEMAJUAN PEKERJAAN
JUMLAH HARGA PENYELESAIAN PEK. s/d PENYELESAIAN PEK. PENYELESAIAN PEK. s/d Bobot
PERKIRAAN HARGA SATUAN BOBOT MINGGU LALU MINGGU INI MINGGU INI Terhadap
No URAIAN SAT (%) Kontrak
KUANTITAS (Rp)
(Rp) [%]
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT
1 2 3 4 5 6 7 8 9 10 11 12 13 14
TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 200,450,000.00 100.00 60.34 29.38 89.72
35
LAPORAN KEMAJUAN PEKERJAAN
PROGRAM : PENGEMBANGAN PENYELENGGARAAN PENATAAN BANGUNAN DAN LINGKUNGAN NOMOR LKP : 004/LKP/TJK-PME/QC/2021
KEGIATAN : PEMBANGUNAN QUR'AN CENTRE TANGGAL LKP : 30 Desember 2021
PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE MINGGU KE : 22 (DUA PULUH DUA)
LOKASI : PEKANBARU, RIAU
TAHUN : 2021
KONTRAKTOR : PT. CIPTA ADHI GUNA
NOMOR : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 TANGGAL KONTRAK : 03 Agustus 2021
ADDENDUM II : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05B TANGGAL KONTRAK : 20 Agustus 2021
ADDENDUM III : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/X/2021/05C TANGGAL KONTRAK : 26 Oktober 2021
ADDENDUM IV : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/XII/2021/05D TANGGAL KONTRAK : 27 Desember 2021
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 24.057 25.594 23.297 23.169 23.169 - 100.000
II.2.1 PEKERJAAN PONDASI DALAM 14.583 16.120 15.432 15.432 15.432 - 100.000
II.2.2 PEKERJAAN BETON PILE CAP 2.866 2.866 3.122 3.122 3.122 - 100.000
II.2.3 PEKERJAAN BETON SLOOF 6.608 6.608 4.742 4.615 4.615 - 100.000
II.3 PEKERJAAN BETON STRUKTUR ATAS 43.182 42.017 47.260 39.505 39.505 - 100.000
II.3.1 BETON KOLOM PEDESTAL 2.538 2.199 2.861 2.924 2.924 - 100.000
II.3.2 ELEVASI ± 0.00 6.648 6.648 8.524 7.630 7.630 - 100.000
II.3.3 ELEVASI + 2.00 0.081 0.081 0.046 0.046 0.046 - 100.000
II.3.5 ELEVASI + 4.50 15.453 14.628 17.218 13.513 13.513 - 100.000
II.3.6 ELEVASI + 8.00 3.104 3.104 - - - -
II.3.7 ELEVASI + 8.50 4.490 4.490 4.413 3.879 3.879 - 100.000
II.3.8 ELEVASI + 11.00 4.425 4.425 5.160 3.205 3.205 - 100.000
II.3.9 ELEVASI + 11.50 6.444 6.444 9.037 8.308 8.308 - 100.000
III.2 FINISHING LUAR GEDUNG 28.495 26.590 22.719 27.704 26.799 0.905
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 11.951 11.951 7.728 13.825 12.973 0.853 93.833
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 10.775 10.775 8.804 7.756 7.704 0.052 99.323
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 5.769 3.864 6.187 6.122 6.122 - 100.000
-
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.639 0.639 0.639 1.963 0.436 1.527
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.042 0.042 0.042 0.042 - 0.042 -
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.196 0.196 0.196 0.192 0.178 0.015 92.424
IV.3 INSTALASI PEMPIPAAN AIR HUJAN 0.401 0.401 0.401 0.375 0.258 0.117 68.842
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK 0.940 - 0.940 -
IV.5 PEKERJAAN PENANGKAL PETIR - - - 0.414 - 0.414 -
Berdasarkan hasil perhitungan bersama pada tanggal 30 Desember 2021, bahwa hasil pekerjaan sampai pada minggu ke-22 (Dua Puluh Dua) yaitu sampai dengan tanggal
30 Desember 2021 adalah sebesar 75.8139 % (Tujuh Puluh Lima Koma Delapan Persen). Kontraktor Pelaksana dapat dibayarkan sebesar 75.8139 % (Tujuh Puluh Lima
Koma Delapan Persen).
Pejabat Pelaksana Teknis Kegiatan (PPTK) PT. TUJUH JAYA KONSULTAN, PT. CIPTA ADHI GUNA
KSO PT. PANCA MANDIRI ENGINEERING
Bulan Ke-
I II III IV V VI VII VIII
Minggu
Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke-
BOBOT Ke-
NO URAIAN PEKERJAAN Ket.
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
3-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec 31-Dec 3-Jan 10-Jan 17-Jan 24-Jan 31-Jan 7-Feb 14-Feb
PMK
8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 30-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 18-Feb
I PEKERJAAN PERSIAPAN 1.893 0.300 0.300 0.300 0.300 0.300 0.228 0.166 100 ###
###
II PEKERJAAN STRUKTUR ###
II.1 PEKERJAAN TANAH 1.286 0.321 0.321 0.321 0.321 P ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF E ###
II.1A PEKERJAAN LANTAI 2.045 0.339 0.339 0.339 0.339 0.339 0.173 N 0.089 0.089
90 ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF Y ###
II.2.1 PEKERJAAN PONDASI DALAM 15.432 0.846 0.846 0.846 0.846 0.846 3.184 3.184 2.338 2.496 E ###
II.2.2 PEKERJAAN BETON PILE CAP 3.122 0.624 0.624 0.624 0.624 0.624 L ###
II.2.3 PEKERJAAN BETON SLOOF 4.615 0.358 0.358 0.358 0.358 1.725 1.458 E ###
II.3 PEKERJAAN BETON STRUKTUR ATAS S 80 ###
II.3.1 BETON KOLOM PEDESTAL 2.924 0.647 0.226 0.226 0.226 0.226 0.647 0.726 A ###
II.3.2 ELEVASI ± 0.00 7.630 1.451 1.451 0.169 0.169 0.169 0.169 0.169 1.851 1.809 I 0.224 ###
II.3.3 ELEVASI + 2.00 0.046 0.046 A ###
II.3.5 ELEVASI + 4.50 13.513 2.198 1.322 1.322 1.322 1.322 1.322 2.054 1.290 N 0.682 0.682 ###
II.3.6 ELEVASI + 8.00 0.000 70 ###
II.3.7 ELEVASI + 8.50 3.879 0.898 0.898 0.898 1.185 P ###
II.3.8 ELEVASI + 11.00 3.205 0.885 0.885 0.885 0.550 E ###
II.3.9 ELEVASI + 11.50 8.308 1.961 0.447 0.447 0.447 1.164 2.328 1.514 K ###
E ###
III PEKERJAAN ARSITEKTUR R
60 ###
III.1 LANTAI SATU J ###
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 2.353 0.401 A 0.651 0.651 0.651 ###
III.1.2 PEKERJAAN TANGGA 0.082 A 0.082 ###
III.2 FINISHING LUAR GEDUNG N 50 ###
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 13.825 2.987 0.864 0.864 0.864 0.872 0.900 0.880 0.660 2.000 ###
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 7.756 1.470 P 0.055 0.055 0.178 0.178 0.550 5.000 2.225 ###
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 6.122 1.608 1.608 1.608 M 0.649 0.649 ###
K ###
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 40 ###
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG ###
50
IV.1.1 SHAFT PIPA 0.042 0.021 0.021 ###
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG ###
IV.2.1 SHAFT PIPA 0.014 0.014 H ###
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.076 A 0.038 0.038
30 ###
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.044 R 0.022 0.022 ###
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.059 I 0.029 0.029 ###
IV.3 INSTALASI PEMPIPAAN AIR HUJAN ###
K
IV.3.1 PIPA TEGAK 0.258 0.106 0.152
20 ###
IV.3.2 LANTAI DAK FFL. ±12.000 0.007 A 0.007 ###
IV.3.3 LANTAI DAK FFL. ±8.000 0.006 L 0.006 ###
IV.3.4 LANTAI DUA 0.000 E ###
IV.3.5 LANTAI SATU 0.058 N 0.058 ###
IV.3.6 LANTAI DAK FFL. ±14.50 0.045 D 0.045 10 ###
E ###
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK R ###
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 0.236 0.236 ###
IV.4.2 FASADE 0.704 0.352 0.352 ###
IV.5 PEKERJAAN PENANGKAL PETIR 00 ###
IV.5.1 GEDUNG UTAMA (Pengadaan dan pemasangan peralatan penangkal petir) 0.414 0.207 0.207 ###
100.000
Bobot Per Minggu 1.976 2.563 2.434 1.843 2.223 6.770 2.885 2.559
Rencana
Komulatif Bobot Per Minggu 0 77.744 80.307 82.741 84.584 86.807 93.577 96.462 99.021
Kontrak ADD V
Bobot Per Minggu 0.300 0.300 0.300 1.467 1.467 1.395 1.167 2.117 5.485 8.041 6.320 9.292 5.170 6.797 4.284 5.242 9.884 1.514 0.000 1.608 2.009 1.608
Realisasi
Komulatif Bobot Per Minggu 0.300 0.600 0.899 2.367 3.834 5.229 6.397 8.514 14.000 22.041 28.361 37.652 42.822 49.619 53.903 59.145 69.029 70.543 70.543 72.151 74.160 75.768
DEVIASI
WAKTU PELAKSANAAN : 150 (SERATUS LIMA PULUH) HARI KALENDER + MASA PELAKSANAAN PMK 50 (LIMA PULUH) HARI KALENDER
Bulan Ke-
I II III IV V VI
BOBOT Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke-
NO URAIAN PEKERJAAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Ket.
(%)
3-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec
8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 30-Dec
I PEKERJAAN PERSIAPAN 1.893 0.316 0.316 0.316 0.316 0.316 0.316 100 ###
###
II PEKERJAAN STRUKTUR ###
II.1 PEKERJAAN TANAH 1.286 0.321 0.321 0.321 0.321 ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF ###
II.1A PEKERJAAN LANTAI 2.045 0.341 0.341 0.341 0.341 0.341 0.341 90 ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF ###
II.2.1 PEKERJAAN PONDASI DALAM 15.432 1.715 1.715 1.715 1.715 1.715 1.715 1.715 1.715 1.715 ###
II.2.2 PEKERJAAN BETON PILE CAP 3.122 0.624 0.624 0.624 0.624 0.624 ###
II.2.3 PEKERJAAN BETON SLOOF 4.615 0.769 0.769 0.769 0.769 0.769 0.769 ###
II.3 PEKERJAAN BETON STRUKTUR ATAS 80 ###
II.3.1 BETON KOLOM PEDESTAL 2.924 0.418 0.418 0.418 0.418 0.418 0.418 0.418 ###
II.3.2 ELEVASI ± 0.00 7.630 0.848 0.848 0.848 0.848 0.848 0.848 0.848 0.848 0.848 ###
II.3.3 ELEVASI + 2.00 0.046 0.046 ###
II.3.5 ELEVASI + 4.50 13.513 1.689 1.689 1.689 1.689 1.689 1.689 1.689 1.689 ###
II.3.6 ELEVASI + 8.00 0.000
70 ###
II.3.7 ELEVASI + 8.50 3.879 0.970 0.970 0.970 0.970 ###
II.3.8 ELEVASI + 11.00 3.205 0.801 0.801 0.801 0.801 ###
II.3.9 ELEVASI + 11.50 8.308 1.187 1.187 1.187 1.187 1.187 1.187 1.187 ###
###
III PEKERJAAN ARSITEKTUR 60 ###
III.1 LANTAI SATU ###
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 2.353 2.353 ###
III.1.2 PEKERJAAN TANGGA 0.082 0.082 ###
III.2 FINISHING LUAR GEDUNG ###
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 13.825 2.3042315 2.3042315 2.3042315 2.3042315 2.3042315 2.3042315
50 ###
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 7.756 1.551 1.551 1.551 1.551 1.551 ###
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 6.122 2.041 2.041 2.041 ###
###
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING ###
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 40 ###
IV.1.1 SHAFT PIPA 0.042 0.042 ###
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG ###
IV.2.1 SHAFT PIPA 0.014 0.014 ###
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.076 0.076 ###
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.044 0.044
30 ###
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.059 0.059 ###
IV.3 INSTALASI PEMPIPAAN AIR HUJAN ###
IV.3.1 PIPA TEGAK 0.258 0.258 ###
IV.3.2 LANTAI DAK FFL. ±12.000 0.007 0.007 ###
20
IV.3.3 LANTAI DAK FFL. ±8.000 0.006 0.006 ###
IV.3.4 LANTAI DUA - ###
IV.3.5 LANTAI SATU 0.058 0.058 ###
IV.3.6 LANTAI DAK FFL. ±14.50 0.045 0.045 ###
###
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK
10 ###
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 0.236 0.236 ###
IV.4.2 FASADE 0.704 0.704 ###
IV.5 PEKERJAAN PENANGKAL PETIR ###
IV.5.1 GEDUNG UTAMA (Pengadaan dan pemasangan peralatan penangkal p 0.414 0.414 ###
00
100.000
Bobot Per Minggu 0.316 0.316 0.316 2.352 2.352 2.352 2.036 2.757 3.605 6.063 7.420 9.361 7.022 7.022 5.635 4.198 7.680 5.300 3.951 6.000 8.485 5.463
Rencana
Komulatif Bobot Per Minggu 0 0.316 0.631 0.947 3.298 5.650 8.002 10.038 12.795 16.400 22.463 29.882 39.244 46.266 53.288 58.923 63.121 70.801 76.101 80.052 86.052 94.537 100.000
Kontrak ADD V
Bobot Per Minggu
Realisasi
Komulatif Bobot Per Minggu
DEVIASI
WAKTU PELAKSANAAN : 150 (SERATUS LIMA PULUH) HARI KALENDER
Perhitungan
No. Sketsa Gambar Keliling
Grid Tinggi (m) Jumlah (m2) Ket
Kolom (m)
Keliling Balok
Grid Panjang Jumlah (m2) Ket
ACP
Posisi : Tampak Luar Bangunan pada kolom dan balok silang Total 1,662.41 m2
Keliling Balok
Grid a/1 b/2 c/3 d/4 Panjang Jumlah (m2) Ket
ACP
c Rangka+ACP Entrance
c
3 1.460 1.000 1.460 1.000 4.920 56.070 275.864 Depan
7A 1.300 1.000 1.300 1.000 4.600 56.070 257.922 Belakang
3 1.460 1.000 1.460 2.000 2.920 Penutup Balok
d b 7A 1.300 1.000 1.300 2.000 2.600 Penutup Balok
Sub Jumlah (I) 536.706 m2
Dikurangi Sisi Bagian Kolom (80.60)
3 0.480 6.000 2.880 Depan
a 7A 0.480 6.000 2.880 Belakang
Sub Jumlah (II) 5.760 m2
1000
5707
9328
7000 12000
K J I H G F E D
a
Depan b. Jumlah (I+II+III+IV) 629.506 m2
Catatan :
- Satuan Pada Sketsa Gambar Milimeter (mm)
- Satuan Pada Perhitungan Kuantitas Meter (m)
2210 b c
2180 b c
150 a
Posisi : Tampak Luar Bangunan pada kolom dan balok silang Total 1,851.81 m2
8000
1000
14000
K J I H G F E D
Keliling Balok
Grid a/1 b/2 c/3 d/4 Panjang Jumlah (m2) Ket
ACP
Rangka+ACP List Logo
3 1.300 1.000 1.300 1.000 4.600 29.760 136.896 Depan
7A 1.300 1.000 1.300 1.000 4.600 29.760 136.896 Belakang
Sub Jumlah II 273.792 m2
6215
3858
3858
7915 7915
K J I H G F E D
5851
3080 3080
2 La p is Le m b a r ACP
Lu a s : 3 9 ,6 9 6 m 2
6899 6899
K J I H G F E D
c
Total 69.300 m2
No. Sketsa Gambar Grid Luas Banyak Warna Jumlah (m2) Ket
8930
8930
14847 14847
K J I H G F E D
Total 139.642 m2
Dikurangi
Jumlah Vertical Sirip ACP dan Pintu
Grid Panjang Tinggi Total (m2) Ket
(m2) Jumlah
Lebar Tinggi Banyak
(m2)
1 2 3 4 5 6 7 8 (5x6x7) 9 (4-8) 10
E (3A-7A) 15.030 3.600 54.108 0.150 3.900 12.000 7.020 Kanan Atas
Dikurangi
Jumlah Vertical Sirip ACP dan Pintu
Grid Panjang Tinggi Total (m2) Ket
(m2) Jumlah
Lebar Tinggi Banyak
(m2)
1 2 3 4 5 6 7 8 (5x6x7) 13 ((4-(8+12)) 14
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
KONTRAK ADDENDUM
No. URAIAN SAT
HARGA SATUAN HARGA
VOL JUMLAH HARGA (Rp) BOBOT (%) VOL JUMLAH HARGA (Rp) BOBOT (%)
(Rp) SATUAN (Rp)
I. Penyiapan RK3K terdiri atas : 2,000,000.000 0.015 2,000,000.000 0.015
a. Pembuatan Manual Prossedur Instruksi Kerja, Ijin Kerja Set 1.000 2,000,000.000 2,000,000.000 0.015 1.000 2,000,000.000 2,000,000.000 0.015181582528
SKETSA PEKERJAAN
29000
Pembatas Bongkaran
Paving Block Existing
6100
C Sisi Luar Bangunan
Gedung Rencana
24100
B
11750
A
40400
76600
ANALISA PERHITUNGAN
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
Jumlah Tinggi Panjang Lebar Luas Dinding Galian Luas Lantai Galian Volume
NO URAIAN PEKERJAAN
Titik M' M' M' M² M² M²
5 Pek. Anti rayap termisida di pile cap I II III IV V = I x (II x III)+(II x IV) x 2 VI = I x III x IV VII = V + VI
a Tipe F1.K/1 29 0.85 1.40 1.40 138.04 56.84 194.880
b Tipe F2.K/2 2 0.85 1.20 1.70 9.86 4.08 13.940
c Tipe F4/4 24 0.85 1.70 1.70 138.72 69.36 208.080
d Tipe F6/6 16 0.85 1.70 2.45 112.88 66.64 179.520
e Tipe F1/1 10 0.85 0.95 0.95 32.3 9.025 41.325
f Tipe F2/2 8 0.85 1.40 1.70 42.16 19.04 61.200
Total 89 698.945
Jumlah Panjang Lebar Volume
NO URAIAN PEKERJAAN
Titik M' M' M²
5 Pek. Anti rayap termisida di plat lantai 1 (wiremesh) I II III IV = I x II x III
a Lantai Bangunan Utama 1 72.00 19.50 1404.000
b Lantai Selasar Depan 10 6.00 6.00 360.000
c Lantai Selasar Belakang 4 6.55 6.00 157.200
Total 1921.200
Jumlah Panjang Lebar Luas
NO URAIAN PEKERJAAN
Titik M' M' M²
5 Pengurangan Luas Penampang Kolom Pedestal I II III IV = I x II x III
a Tipe F1.K/1 29 1.20 1.20 41.760
b Tipe F2.K/2 2 1.00 1.50 3.000
c Tipe F4/4 24 1.50 1.50 54.000
d Tipe F6/6 16 1.50 2.25 54.000
e Tipe F1/1 10 0.75 0.75 5.625
f Tipe F2/2 8 1.20 1.50 14.400
Total 71 172.785
Sub Jumlah Vol. Anti rayap total (1+2-3) 2447.360
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
Keterangan
VI
Grid G,I | 5+,5-
Grid E,F,G,I,J,K | 7,3A
Dibuat Oleh :
Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
SKETSA PEKERJAAN
ANALISA PERHITUNGAN
no keterangan
1 gedung utama
2 gedung samping
no keterangan
1 gedung utama
2 pintu depan belakang dan samping ( pengurangan curtain wall)
no keterangan
2 gedung samping
AW 2
Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 lengkap nok dan a
AW 1
Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium skin 0.3
a. Posisi : Tampak Luar Bangunan pada kolom dan balok silang
no keterangan panjang tinggi
1 kolom luar cafe tinggi 11m (sekeliling) 3.2 11
2 kolom bangunan tengah bentuk C tinggi +11.5 1.6 11.5
3 kolom bangunan tengah bentuk C diatas elv +8.5 1.6 6.1
4 kolom bangunan tengah bentuk L 2.4 11.5
5 kolom bangunan tengah bentuk pesegi 80x80 mulai elv. 11,5- elv 3.2 2.7
6 kolom bangunan tengah bentuk pesegi 80x80 mulai elv. 11,5- elv 3.2 3.1
7 kolom kelas C 1.6 8.5
8 kolom kelas L 2.4 8.5
9 kolom bangunan kelas bentuk pesegi 80x80 mulai elv. +8,5- elv 3.2 1
10 x bawah depan belakang
keterangan
- surface depan dan belakang (2 sisi) 33.59 luas
- surface samping (4 sisi - atas, bawah, kiri, kanan) 113.87 keliling
AW 2 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium skin 0.3
cutting Logo dan Ornamen
no keterangan luas jumlah
1 cutting logo depan belakang 39.7 2
2 cutting leher biru depan belakang 73.3 2
AW 2
Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 lengkap nok dan a
III.2.3 2
1 WF350.175.6.9 kg 41.40
WF350.175.6.9 kg 41.40
Untuk Plat Sambungan Kg
2 C200.50.50.4,5 kg 10.10
3 Plat Talang Air Hujan kg 20.41
1 WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
Untuk Plat Sambungan Kg
1 WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
Untuk Plat Sambungan Kg
1 WF350.175.6.9 kg 41.40
WF350.175.6.9 kg 41.40
Untuk Plat Sambungan Kg
2 C200.50.50.4,5 Kg 10.10
3 Plat Talang Air Hujan Kg 20.41
volume
48.672
32.184
total hitungan 80.856
volume
1074
-9.9 2.2 m tinggi
total 1064.1 0.9 m lebar 1 pintu
hitungan mc nol sisa volume
m2 509.58 622.20 112.62
volume
509.58
volume
722.3
total 1189.49
hitungan mc nol sisa volume
m2 407.20 761.00 353.80
jumlah volume
tebal depan belakang
2 2 106.56
0.75 2 69.06
2 2 67.64
0.75 2 84.54
2 79.40
total 407.20
0 0 0.00
4.5 5 45.00
1 2 58.74
0.5 2 21.93
4 2 133.92
total 335.995
0 0 0.00
5.05 5 50.50
1 2 74.54
0.5 2 24.43
4 2 133.92
total 359.80
volume
475.32
volume
242.51
169.58
3,402.92
3,459.458
Sambungan 40D
0.32
Kait 6D B.
0.048
JUM
BAHAN
Brazing
Sealant
Sekrup
Bracket ACP
ACP PVDF 4 mm alumunium skin 0.3 mm tkdn 61% +
sewa scaffolding
JUM
Jumlah (A + B)
Overhead & Profit
HARGA SATUAN PEKERJAAN (C + D)
PEMBULATAN
Satuan Koefisien Harga Satuan Jumlah Harga