REKAPITULASI LAPORAN MINGGUAN

KEGIATAN : PEMBANGUNAN QUR'AN CENTRE PELAKSANA : PT. CIPTA ADHI GUNA


PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE MK : PT. TUJUH JAYA KONSULTAN, KSO
LOKASI : PEKANBARU PT. PANCA MANDIRI ENGINEERING
T.A : 2021 MINGGU KE : XXI [DUA PULUH SATU]
DARI TANGGAL : 20 Desember 2021
SAMPAI TGL. : 26 Desember 2021

ADDENDUM ADDENDUM LAPORAN KEMAJUAN PEKERJAAN


KONTRAK MC-0
III IV S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN PRESTASI (%)
BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%)

1 2 4 4 5 6 7 8 9

I PEKERJAAN PERSIAPAN 1.7940 1.7989 1.8932 1.8932 1.7272 - 1.7272 91.23

II PEKERJAAN STRUKTUR 68.5164 70.2150 73.8759 66.0052 64.2860 - 0.0463 64.2397 86.96
II.1 PEKERJAAN TANAH 1.2776 0.5727 1.2753 1.2859 1.2859 - 1.2859 100.83
II.1A PEKERJAAN LANTAI - 2.0312 2.0446 2.0446 1.8665 - 1.8665 91.29

II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 24.0566 25.5935 23.2968 23.1694 23.1694 - 23.1694 99.45
II.2.1 PEKERJAAN PONDASI DALAM 14.5831 16.1200 15.4325 15.4325 15.4325 - 15.4325 100.00
II.2.2 PEKERJAAN BETON PILE CAP 2.8656 2.8656 3.1219 3.1219 3.1219 - 3.1219 100.00
II.2.3 PEKERJAAN BETON SLOOF 6.6080 6.6080 4.7424 4.6150 4.6150 - 4.6150 97.31

II.3 PEKERJAAN BETON STRUKTUR ATAS 43.1822 42.0175 47.2591 39.5052 37.9641 - 0.0463 37.9178 80.23
II.3.1 BETON KOLOM PEDESTAL 2.5382 2.1986 2.8610 2.9243 2.9243 - 2.9243 102.21
II.3.2 ELEVASI ± 0.00 6.6478 6.6478 8.5240 7.6301 7.4060 - 7.4060 86.88
II.3.3 ELEVASI + 2.00 0.0807 0.0807 0.0463 0.0463 0.0463 - 0.0463 100.00
II.3.5 ELEVASI + 4.50 15.4527 14.6275 17.2176 13.5133 12.1500 - 12.1500 70.57
II.3.6 ELEVASI + 8.00 3.1040 3.1040 - - 0.0463 - 0.0463 -
II.3.7 ELEVASI + 8.50 4.4902 4.4902 4.4131 3.8789 3.8789 - 3.8789 87.89
II.3.8 ELEVASI + 11.00 4.4249 4.4249 5.1605 3.2046 3.2046 - 3.2046 62.10
II.3.9 ELEVASI + 11.50 6.4438 6.4438 9.0365 8.3078 8.3078 - 8.3078 91.94

III PEKERJAAN ARSITEKTUR 29.0511 27.3476 23.5919 30.1389 7.2677 1.4855 8.7533 37.10
III.1 LANTAI SATU 0.5562 0.7575 0.8729 3.1655 0.2409 - 0.2409 27.60
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.4259 0.6272 0.7910 3.0836 0.2409 - 0.2409 38.42
III.1.2 PEKERJAAN TANGGA 0.1304 0.1304 0.0819 0.0819 - - - -

III.2 FINISHING LUAR GEDUNG 28.4949 26.5901 22.7190 26.9734 7.0268 - 8.5124 37.47
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 11.9513 11.9513 7.7275 10.8918 1.3803 - 2.8659 23.98
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 10.7750 10.7750 8.8044 9.7106 1.4703 - 1.4703 13.65
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 5.7686 3.8637 6.1871 6.3710 4.1762 - 4.1762 108.09

IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.6385 0.6385 0.6385 1.9627 0.1194 - 0.1194 18.70
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.0416 0.0416 0.0416 0.0416 - - - -
IV.1.1 SHAFT PIPA 0.0416 0.0416 0.0416 0.0416 - - - -

IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.1958 0.1958 0.1958 0.1925 0.0357 - 0.0357 18.23
IV.2.1 SHAFT PIPA 0.0515 0.0515 0.0515 0.0136 - - - -
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.0807 0.0807 0.0807 0.0759 0.0357 - 0.0357 44.22
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.0636 0.0636 0.0636 0.0440 - - - -
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.0590 -
IV.3 INSTALASI PEMPIPAAN AIR HUJAN 0.4011 0.4011 0.4011 1.7286 0.0837 - 0.0837 20.87
IV.3.1 PIPA TEGAK 0.0837 0.0837 0.0837 0.2579 0.0837 - 0.0837 100.00
IV.3.2 LANTAI DAK FFL. ±12.000 0.0546 0.0546 0.0546 0.0074 - - - -
IV.3.3 LANTAI DAK FFL. ±8.000 0.0740 0.0740 0.0740 0.0058 - - - -
IV.3.4 LANTAI DUA 0.0740 0.0740 0.0740 - - - - -
IV.3.5 LANTAI SATU 0.1148 0.1148 0.1148 0.0584 - - - -
IV.3.6 LANTAI DAK FFL. ±14.50 0.0451 - - -
IV.4 LAMPU & INST. PENERANGAN &STOP KONTAK 0.9398 - - -
IV.5 PEKERJAAN PENANGKAL PETIR 0.4141 - - -
100.000 100.000 100.000 100.000 73.4003 1.4392 74.8395
Rencana Komulatif Bobot Per Minggu 95.160
Realisasi Komulatif Bobot Per Minggu 74.840
Deviasi - 20.321 [ LAMBAT ]

Pekanbaru, 26 Desember 2021


Dibuat Oleh :
Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING

CHOIRUS S, ST., M.Si


Team Leader

Page 1 of 89
1 03 Agustus 2021 1 Selasa 1 03 Agustus 2021 s.d 8 Agustus 2021 I SATU
2 4 Agustus 2021 2 Rabu 2 9 Agustus 2021 s.d 15 Agustus 2021 II DUA
3 5 Agustus 2021 3 Kamis 3 16 Agustus 2021 s.d 22 Agustus 2021 ad2 III TIGA
4 6 Agustus 2021 4 Jum'at 4 23 Agustus 2021 s.d 29 Agustus 2021 I IV EMPAT
5 7 Agustus 2021 5 Sabtu 5 30 Agustus 2021 s.d 5 september 2021 V LIMA
6 8 Agustus 2021 6 1 Minggu 6 6 september 2021 s.d 12 september 2021 VI ENAM
7 9 Agustus 2021 1 Senin 7 13 september 2021 s.d 19 september 2021 VII TUJUH
8 10 Agustus 2021 2 Selasa 8 20 september 2021 s.d 26 september 2021 II VIII DELAPAN
9 11 Agustus 2021 3 Rabu 9 27 september 2021 s.d 3 Oktober 2021 IX SEMBILAN
10 12 Agustus 2021 4 Kamis 10 4 Oktober 2021 s.d 10 Oktober 2021 X SEPULUH
11 13 Agustus 2021 5 Jum'at 11 11 Oktober 2021 s.d 17 Oktober 2021 XI SEBELAS
12 14 Agustus 2021 6 Sabtu 137 12 18 Oktober 2021 s.d 24 Oktober 2021 III XII DUA BELAS
13 15 Agustus 2021 7 2 Minggu 13 25 Oktober 2021 s.d 31 Oktober 2021 AD3 XIII TIGA BELAS
14 16 Agustus 2021 1 Senin 14 01 November 2021 s.d 7 November 2021 XIV EMPAT BELAS
15 17 Agustus 2021 2 Selasa 15 08 November 2021 s.d 14 November 2021 XV LIMA BELAS
16 18 Agustus 2021 3 Rabu 16 15 November 2021 s.d 21 November 2021 XVI ENAM BELAS
17 19 Agustus 2021 4 Kamis 17 22 November 2021 s.d 28 November 2021 IV XVII TUJUH BELAS
18 20 Agustus 2021 5 Jum'at 18 29 November 2021 s.d 5 Desember 2021 XVIII DELAPAN BELAS
19 21 Agustus 2021 6 Sabtu 19 6 Desember 2021 s.d 12 Desember 2021 XIX SEMBILAN BELAS
20 22 Agustus 2021 7 3 Minggu 20 13 Desember 2021 s.d 19 Desember 2021 XX DUA PULUH
21 23 Agustus 2021 1 Senin 21 20 Desember 2021 s.d 26 Desember 2021 XI DUA PULUH SATU
22 24 Agustus 2021 2 Selasa 22 27 Desember 2021 s.d 30 Desember 2021 V XII DUA PULUH DUA
23 25 Agustus 2021 3 Rabu
24 26 Agustus 2021 4 Kamis kebutuhan resapan : IV 14 - 18
25 27 Agustus 2021 5 Jum'at kunci per 1000 adalah 40 m3
26 28 Agustus 2021 6 Sabtu atau 40 / 1000 0.04 m3 per persegi
27 29 Agustus 2021 7 4 Minggu 3,625.32 X 0.04 145.01
28 30 Agustus 2021 1 Senin
29 31 Agustus 2021 2 Selasa rekayasa resapan :
30 01 september 2021 3 Rabu V=πxrxrxt 3.14 0.75 0.75
31 2 september 2021 4 Kamis 12.36
32 3 september 2021 5 Jum'at 11.73
33 4 september 2021 6 Sabtu KOLOM lantai 1
34 5 september 2021 7 5 Minggu
35 6 september 2021 1 Senin
36 7 september 2021 2 Selasa
37 8 september 2021 3 Rabu
38 9 september 2021 4 Kamis
39 10 september 2021 5 Jum'at
40 11 september 2021 6 Sabtu
41 12 september 2021 7 6 Minggu
42 13 september 2021 1 Senin
43 14 september 2021 2 Selasa
44 15 september 2021 3 Rabu
45 16 september 2021 4 Kamis
46 17 september 2021 5 Jum'at
47 18 september 2021 6 Sabtu
48 19 september 2021 7 7 Minggu
49 20 september 2021 1 Senin
50 21 september 2021 2 Selasa
51 22 september 2021 3 Rabu
52 23 september 2021 4 Kamis
53 24 september 2021 5 Jum'at
54 25 september 2021 6 Sabtu
55 26 september 2021 7 8 Minggu 95
56 27 september 2021 1 Senin
57 28 september 2021 2 Selasa
58 29 september 2021 3 Rabu
59 30 september 2021 4 Kamis
60 01 Oktober 2021 5 Jum'at
61 2 Oktober 2021 6 Sabtu
62 3 Oktober 2021 7 9 Minggu
63 4 Oktober 2021 1 Senin
64 5 Oktober 2021 2 Selasa
65 6 Oktober 2021 3 Rabu
66 7 Oktober 2021 4 Kamis
67 8 Oktober 2021 5 Jum'at
68 9 Oktober 2021 6 Sabtu
69 10 Oktober 2021 7 10 Minggu
70 11 Oktober 2021 1 Senin
71 12 Oktober 2021 2 Selasa 7
72 13 Oktober 2021 3 Rabu
73 14 Oktober 2021 4 Kamis
74 15 Oktober 2021 5 Jum'at
75 16 Oktober 2021 6 Sabtu
76 17 Oktober 2021 7 11 Minggu
77 18 Oktober 2021 1 Senin
78 19 Oktober 2021 2 Selasa
79 20 Oktober 2021 3 Rabu
80 21 Oktober 2021 4 Kamis
81 22 Oktober 2021 5 Jum'at
82 23 Oktober 2021 6 Sabtu
83 24 Oktober 2021 7 12 Minggu
84 25 Oktober 2021 1 Senin
85 26 Oktober 2021 2 Selasa
86 27 Oktober 2021 3 Rabu
87 28 Oktober 2021 4 Kamis
88 29 Oktober 2021 5 Jum'at
89 30 Oktober 2021 6 Sabtu
90 31 Oktober 2021 7 13 Minggu
91 01 November 2021 1 Senin
92 2 November 2021 2 Selasa
93 3 November 2021 3 Rabu
94 4 November 2021 4 Kamis
95 5 November 2021 5 Jum'at
96 6 November 2021 6 Sabtu
97 7 November 2021 7 14 Minggu
98 8 November 2021 1 Senin
99 9 November 2021 2 Selasa
100 10 November 2021 3 Rabu
101 11 November 2021 4 Kamis
102 12 November 2021 5 Jum'at
103 13 November 2021 6 Sabtu
104 14 November 2021 7 15 Minggu
105 15 November 2021 1 Senin
106 16 November 2021 2 Selasa
107 17 November 2021 3 Rabu
108 18 November 2021 4 Kamis
109 19 November 2021 5 Jum'at
110 20 November 2021 6 Sabtu
111 21 November 2021 7 16 Minggu
112 22 November 2021 1 Senin
113 23 November 2021 2 Selasa 37
114 24 November 2021 3 Rabu
115 25 November 2021 4 Kamis
116 26 November 2021 5 Jum'at
117 27 November 2021 6 Sabtu
118 28 November 2021 7 17 Minggu
119 29 November 2021 1 Senin
120 30 November 2021 2 Selasa
121 01 Desember 2021 3 Rabu
122 2 Desember 2021 4 Kamis
123 3 Desember 2021 5 Jum'at
124 4 Desember 2021 6 Sabtu
125 5 Desember 2021 7 18 Minggu
126 6 Desember 2021 1 Senin
127 7 Desember 2021 2 Selasa
128 8 Desember 2021 3 Rabu
129 9 Desember 2021 4 Kamis
130 10 Desember 2021 5 Jum'at
131 11 Desember 2021 6 Sabtu
132 12 Desember 2021 7 19 Minggu
133 13 Desember 2021 1 Senin
134 14 Desember 2021 2 Selasa
135 15 Desember 2021 3 Rabu
136 16 Desember 2021 4 Kamis
137 17 Desember 2021 5 Jum'at
138 18 Desember 2021 6 Sabtu
139 19 Desember 2021 7 20 Minggu
140 20 Desember 2021 1 Senin
141 21 Desember 2021 2 Selasa
142 22 Desember 2021 3 Rabu
143 23 Desember 2021 4 Kamis
144 24 Desember 2021 5 Jum'at
145 25 Desember 2021 6 Sabtu
146 26 Desember 2021 7 21 Minggu
147 27 Desember 2021 1 Senin
148 28 Desember 2021 2 Selasa
149 29 Desember 2021 3 Rabu
150 30 Desember 2021 4 22 Kamis
LAPORAN MINGGUAN

KEGIATAN : Pembangunan Qur'an Centre


PEKERJAAN : Fisik Pembangunan Qur'an Centre Pelaksana : PT. CIPTA ADHI GUNA
No. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 TANGGAL : 03 Agustus 2021 Konsultan MK : PT. TUJUH JAYA KONSULTAN
No. ADDENDUM I : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 TANGGAL : 09 Agustus 2021 KSO PT. PANCA MANDIRI ENGINEERING
No. ADDENDUM II : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05B TANGGAL : 20 Agustus 2021 Minggu Ke : XXI [DUA PULUH SATU]
No. ADDENDUM III : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/X/2021/05C TANGGAL : 28 Oktober 2021 Dari Tgl. : 20 Desember 2021 -
No. ADDENDUM IV : 645.8/PUPRPKPP-CK/ADD.IV-Fsk.QURANCENTRE/XII/2021/05.D TANGGAL : 22 Desember 2021 Sampai Tgl. : 26 Desember 2021
TAHUN ANGGARAN : 2021

LAPORAN KEMAJUAN PEKERJAAN


ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

I PEKERJAAN PERSIAPAN 1.893 249,410,765.80 1.893 1.727 - 1.727


1 Persiapan Pekerjaan SMK3 Ls 200,450,000.00 1.00 1.616 1.00 212,870,000.00 1.616 0.90 1.4498 - - 0.90 1.4498 89.72
2 Pek. Pembersihan Lahan m2 14,630.00 2,497.66 0.277 2,497.66 36,540,765.80 0.277 2,497.66 0.2774 - - 2,497.66 0.2774 100.00

II PEKERJAAN STRUKTUR 73.876 8,695,424,894.17 66.005 64.240 - 64.240


II.1 PEKERJAAN TANAH 1.275 169,405,226.58 1.286 1.286 - 1.286
1 Pek. Galian Tanah Pondasi m3 82,220.00 196.86 0.123 196.86 16,185,983.36 0.123 196.86 0.1229 - - 196.86 0.1229 100.00
Posisi : Galian Pile Cap
2 Pek. Galian Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - -
3 Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - -
4 Pek. Urugan Tanah Kembali m3 32,890.00 52.23 0.013 49.99 1,644,323.22 0.012 49.99 0.0125 - - 49.99 0.0125 100.00
5 Pek. Anti rayap termisida m2 56,000.00 2,421.18 1.029 2,447.36 137,052,160.00 1.040 2,447.36 1.0403 - - 2,447.36 1.0403 100.00
6 Pek. Pengukuran dan pemasangan Bouwplank m1 64,260.00 226.00 0.110 226.00 14,522,760.00 0.110 226.00 0.1102 - - 226.00 0.1102 100.00

II.1A PEKERJAAN LANTAI 2.045 269,353,928.41 2.045 1.866 - 1.866


2 Pek. Pengurugan dengan Tanah Urug m3 176,710.00 1,524.27 2.045 1,524.27 269,353,928.41 2.045 1,391.48 1.8665 - - 1,391.48 1.8665 91.29

II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 23.297 3,052,309,959.81 23.169 23.169 - 23.169
Data Pondasi
- Pondasi Tiang Pancang Mini Pile 25x25 cm
- Mutu Beton Tiang Pancang K-450
- Kedalaman Pondasi ± 18.5 meter dari MT asli
- Jenis dan Jumlah Pile Cap
Type F1/1 Pile 10 ttk
Type F2/2 Pile 8 ttk
Type F4/4 Pile 24 ttk
Type F6/6 Pile 16 ttk
Type F1K/1 Pile 29 ttk
Type F2K/2 Pile 2 ttk

II.2.1 PEKERJAAN PONDASI DALAM 15.432 2,033,055,000.00 15.432 15.432 - 15.432


1 Pek. Mobilisasi dan Demobilisasi Alat Pancang 100,000,000.00 2.00 1.518 2.00 200,000,000.00 1.518 2.00 1.5182 - - 2.00 1.5182 100.00
2 Pengadaan Tiang Pancang Mini Pile 25x25 cm 255,000.00 4,950.00 9.581 4,950.00 1,262,250,000.00 9.581 4,950.00 9.5815 - - 4,950.00 9.5815 100.00
3 Sambungan Tiang Pancang Mini Pile 25x25 cm 125,000.00 565.00 0.536 565.00 70,625,000.00 0.536 565.00 0.5361 - - 565.00 0.5361 100.00
4 Penurunan dan handling tiang pancang Mini Pile 25x25 cm 15,000.00 4,896.00 0.557 4,896.00 73,440,000.00 0.557 4,896.00 0.5575 - - 4,896.00 0.5575 100.00
5 Pemancangan Tiang Pancang Mini Pile 25x25 cm 65,000.00 4,896.00 2.416 4,896.00 318,240,000.00 2.416 4,896.00 2.4157 - - 4,896.00 2.4157 100.00
6 Pengelasan Sambungan Tiang Pancang Mini Pile 25x25 cm 90,000.00 565.00 0.386 565.00 50,850,000.00 0.386 565.00 0.3860 - - 565.00 0.3860 100.00
7 Pek. Pemotongan Tiang Pancang beikut buang ke luar lokasi proyek 150,000.00 251.00 0.286 251.00 37,650,000.00 0.286 251.00 0.2858 - - 251.00 0.2858 100.00
8 Test PDA 20,000,000.00 1.00 0.152 1.00 20,000,000.00 0.152 1.00 0.1518 - - 1.00 0.1518 100.00

II.2.2 PEKERJAAN BETON PILE CAP 3.122 411,280,713.26 3.122 3.122 - 3.122
1 Pile Cap Type F1/1 Pile Bangunan Utama 0.126 16,607,015.45 0.126 0.126 - 0.126
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 0.48 0.001 0.48 111,693.04 0.001 0.48 0.0008 - - 0.48 0.0008 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 0.48 0.003 0.48 447,937.99 0.003 0.48 0.0034 - - 0.48 0.0034 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 25.50 0.034 25.50 4,424,760.00 0.034 25.50 0.0336 - - 25.50 0.0336 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 171.29 0.017 171.29 2,283,240.97 0.017 171.29 0.0173 - - 171.29 0.0173 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 259.46 0.026 259.46 3,458,637.20 0.026 259.46 0.0263 - - 259.46 0.0263 100.00
f. Pek. Beton K-300 m2 1,229,960.00 4.78 0.045 4.78 5,880,746.25 0.045 4.78 0.0446 - - 4.78 0.0446 100.00

2 Pile Cap Type F2/2 Pile 0.237 31,184,942.45 0.237 0.237 - 0.237

5
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 1.24 0.002 1.24 285,934.18 0.002 1.24 0.0022 - - 1.24 0.0022 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 1.24 0.009 1.24 1,146,721.25 0.009 1.24 0.0087 - - 1.24 0.0087 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 36.72 0.048 36.72 6,371,654.40 0.048 36.72 0.0484 - - 36.72 0.0484 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 303.40 0.031 303.40 4,044,280.84 0.031 303.40 0.0307 - - 303.40 0.0307 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 321.20 0.033 321.20 4,281,641.39 0.033 321.20 0.0325 - - 321.20 0.0325 100.00
f. Pek. Beton K-300 m2 1,229,960.00 12.24 0.114 12.24 15,054,710.40 0.114 12.24 0.1143 - - 12.24 0.1143 100.00

3 Pile Cap Type F4/4 Pile 0.956 125,882,883.70 0.956 0.956 - 0.956
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 0.008 4.64 1,072,253.16 0.008 4.64 0.0081 - - 4.64 0.0081 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 0.033 4.64 4,300,204.68 0.033 4.64 0.0326 - - 4.64 0.0326 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 122.40 0.161 122.40 21,238,848.00 0.161 122.40 0.1612 - - 122.40 0.1612 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 3,212.03 0.325 3,212.03 42,816,413.86 0.325 3,212.03 0.3250 - - 3,212.03 0.3250 100.00
e. Pek. Beton K-300 m2 1,229,960.00 45.90 0.429 45.90 56,455,164.00 0.429 45.90 0.4285 - - 45.90 0.4285 100.00

4 Pile Cap Type F6/6 Pile 1.065 140,260,562.57 1.065 1.065 - 1.065
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 0.008 4.64 1,072,253.16 0.008 4.64 0.0081 - - 4.64 0.0081 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 0.033 4.64 4,300,204.68 0.033 4.64 0.0326 - - 4.64 0.0326 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 102.00 0.134 102.00 17,699,040.00 0.134 102.00 0.1343 - - 102.00 0.1343 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 1,906.51 0.193 1,906.51 25,413,830.55 0.193 1,906.51 0.1929 - - 1,906.51 0.1929 100.00
e. Pek. Pembesian ɸ 22 kg 13,330.00 2,649.67 0.268 2,649.67 35,320,070.17 0.268 2,649.67 0.2681 - - 2,649.67 0.2681 100.00
f. Pek. Beton K-300 m2 1,229,960.00 45.90 0.429 45.90 56,455,164.00 0.429 45.90 0.4285 - - 45.90 0.4285 100.00

5 Pile Cap Type FK 1 / 1 Pile 0.687 90,465,147.28 0.687 0.687 - 0.687


a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 3.59 0.006 3.59 829,209.11 0.006 3.59 0.0063 - - 3.59 0.0063 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 3.59 0.025 3.59 3,325,491.62 0.025 3.59 0.0252 - - 3.59 0.0252 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 118.32 0.156 118.32 20,530,886.40 0.156 118.32 0.1558 - - 118.32 0.1558 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 659.89 0.067 659.89 8,796,310.82 0.067 659.89 0.0668 - - 659.89 0.0668 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 999.59 0.101 999.59 13,324,589.17 0.101 999.59 0.1011 - - 999.59 0.1011 100.00
f. Pek. Beton K-300 m2 1,229,960.00 35.50 0.331 35.50 43,658,660.16 0.331 35.50 0.3314 - - 35.50 0.3314 100.00

6 Pile Cap Type FK 2 / 2 Pile 0.052 6,880,161.82 0.052 0.052 - 0.052


a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 0.26 0.000 0.26 59,569.62 0.0005 0.26 0.0005 - - 0.26 0.0005 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 0.26 0.002 0.26 238,900.26 0.002 0.26 0.0018 - - 0.26 0.0018 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 8.50 0.011 8.50 1,474,920.00 0.011 8.50 0.0112 - - 8.50 0.0112 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 67.51 0.007 67.51 899,963.59 0.007 67.51 0.0068 - - 67.51 0.0068 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 80.30 0.008 80.30 1,070,410.35 0.008 80.30 0.0081 - - 80.30 0.0081 100.00
f. Pek. Beton K-300 m2 1,229,960.00 2.55 0.024 2.55 3,136,398.00 0.024 2.55 0.0238 - - 2.55 0.0238 100.00

II.2.3 PEKERJAAN BETON SLOOF 4.742 607,974,246.55 4.615 4.615 - 4.615


1 Pek. Beton Sloof BS 30x60 cm 3.092 408,874,572.76 3.104 3.104 - 3.104
a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 - - 4.60 378,031.12 0.003 4.60 0.0029 - - 4.60 0.0029 100.00
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - - -
c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - - -
d. Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 643.98 0.873 643.98 115,021,267.80 0.873 643.98 0.8731 - - 643.98 0.8731 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 10,130.00 1.025 10,110.84 134,777,453.69 1.023 10,110.84 1.0231 - - 10,110.84 1.0231 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 4,666.00 0.472 4,774.90 63,649,463.26 0.483 4,774.90 0.4831 - - 4,774.90 0.4831 100.00
- Pek. Beton K-300 m3 1,229,960.00 77.28 0.721 77.28 95,048,356.90 0.721 77.28 0.7215 - - 77.28 0.7215 100.00

2 Pek. Beton Sloof BS 40x70 cm 1.348 162,937,193.63 1.237 1.237 - 1.237


a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 - - 0.57 46,536.52 0.000 0.57 0.0004 - - 0.57 0.0004 100.00
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - -
c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - -
d. Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 211.82 0.287 211.82 37,833,170.20 0.287 211.82 0.2872 - - 211.82 0.2872 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 4,183.98 0.423 4,183.98 55,772,418.34 0.423 4,183.98 0.4234 - - 4,183.98 0.4234 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 1,408.64 0.143 1,436.01 19,142,059.29 0.145 1,436.01 0.1453 - - 1,436.01 0.1453 100.00
- Pek. Beton K-300 m3 1,229,960.00 53.02 0.495 40.77 50,143,009.28 0.381 40.77 0.3806 - - 40.77 0.3806 100.00

3 Pek. Beton Sloof BS 80x80 cm - - - - - -


a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 - - - - - - - -
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - -
c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - -

6
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

d. Pek. Beton Sloof


- Pek. Bekisting Sloof m2 178,610.00 - - - - - - - -
- Pek. Pembesian Ø 16 kg 13,330.00 - - - - - - - -
- Pek. Pembesian Ø 10 kg 13,330.00 - - - - - - - -
- Pek. Beton K-300 m3 1,229,960.00 - - - - - - - -

3a Pek. Beton Sloof BS 60x80 cm 0.303 36,162,480.16 0.275 0.275 - 0.275


a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 - - 1.05 86,577.66 0.001 1.05 0.0007 - - 1.05 0.0007 100.00
d Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 49.69 0.067 49.69 8,874,416.46 0.067 49.69 0.0674 - - 49.69 0.0674 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 781.80 0.079 781.80 10,421,353.56 0.079 781.80 0.0791 - - 781.80 0.0791 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 171.41 0.017 184.36 2,457,494.27 0.019 184.36 0.0187 - - 184.36 0.0187 100.00
- Pek. Beton K-300 m3 1,229,960.00 14.86 0.139 11.64 14,322,638.21 0.109 11.64 0.1087 - - 11.64 0.1087 100.00

II.3 PEKERJAAN BETON STRUKTUR ATAS 47.260 5,204,355,779.37 39.505 37.918 - 37.918
II.3.1 BETON KOLOM PEDESTAL 2.861 385,237,688.60 2.924 2.924 - 2.924
1 Pek. Kolom K 40x40 cm 0.137 17,843,249.42 0.135 0.135 - 0.135
a. Pek. Bekisting Kolom m2 184,440.00 16.80 0.024 15.72 2,899,396.80 0.022 15.72 0.0220 - - 15.72 0.0220 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 - - - - - - - - -
b1. Pek. Pembesian Ø 25 kg 13,330.00 924.75 0.094 924.75 12,326,917.50 0.094 924.75 0.0936 - - 924.75 0.0936 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 41.31 0.004 41.31 550,602.32 0.004 41.31 0.0042 - - 41.31 0.0042 100.00
d. Pek. Beton K-300 m3 1,229,960.00 1.68 0.016 1.68 2,066,332.80 0.016 1.68 0.0157 - - 1.68 0.0157 100.00

2 Pek. Kolom K 50x80 cm 0.137 17,858,630.68 0.136 0.136 - 0.136


a. Pek. Bekisting Kolom m2 184,440.00 10.92 0.015 10.02 1,848,088.80 0.014 10.02 0.0140 - - 10.02 0.0140 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 1,017.23 0.103 1,017.23 13,559,609.25 0.103 1,017.23 0.1029 - - 1,017.23 0.1029 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 28.85 0.003 28.85 384,599.83 0.003 28.85 0.0029 - - 28.85 0.0029 100.00
d. Pek. Beton K-300 m3 1,229,960.00 1.68 0.016 1.68 2,066,332.80 0.016 1.68 0.0157 - - 1.68 0.0157 100.00

3 Pek. Kolom K 60x60 cm 1.022 134,319,241.56 1.020 1.020 - 1.020


a. Pek. Bekisting Kolom m2 184,440.00 93.24 0.131 91.62 16,898,392.80 0.128 91.62 0.1283 - - 91.62 0.1283 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 7,166.81 0.725 7,166.81 95,533,610.63 0.725 7,166.81 0.7252 - - 7,166.81 0.7252 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 351.46 0.036 351.46 4,685,017.57 0.036 351.46 0.0356 - - 351.46 0.0356 100.00
d. Pek. Beton K-300 m3 1,229,960.00 13.99 0.131 13.99 17,202,220.56 0.131 13.99 0.1306 - - 13.99 0.1306 100.00

4 Pek. Kolom K 80x80 cm 1.566 215,216,566.96 1.634 1.634 - 1.634


a. Pek. Bekisting Kolom m2 184,440.00 117.60 0.165 126.42 23,316,904.80 0.177 126.42 0.1770 - - 126.42 0.1770 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 11,220.30 1.135 11,543.96 153,881,020.13 1.168 11,543.96 1.1681 - - 11,543.96 1.1681 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 456.75 0.046 495.90 6,610,383.47 0.050 495.90 0.0502 - - 495.90 0.0502 100.00
d. Pek. Beton K-300 m3 1,229,960.00 23.52 0.220 25.54 31,408,258.56 0.238 25.54 0.2384 - - 25.54 0.2384 100.00

5 Pek. Kolom K 120x100 cm - - - - - -


a. Pek. Bekisting Kolom m2 184,440.00 - - - - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - - - -

II.3.2 ELEVASI ± 0.00 8.524 1,005,178,494.49 7.630 7.406 - 7.406


BETON KOLOM (Elv ± 0.00 - Elv ± 4.50) 5.416 595,738,065.10 4.522 4.522 - 4.522
1 Pek. Kolom K 50x80 cm 0.369 24,505,448.93 0.186 0.186 - 0.186
a. Pek. Bekisting Kolom m2 184,440.00 46.80 0.066 22.41 4,133,300.40 0.031 22.41 0.0314 - - 22.41 0.0314 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 1,864.91 0.189 932.46 12,429,641.81 0.094 932.46 0.0944 - - 932.46 0.0944 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 472.73 0.048 263.66 3,514,650.72 0.027 263.66 0.0267 - - 263.66 0.0267 100.00
d. Pek. Beton K-300 m3 1,229,960.00 7.20 0.067 3.60 4,427,856.00 0.034 3.60 0.0336 - - 3.60 0.0336 100.00

2 Pek. Kolom K 60x60 cm 1.394 184,677,062.99 1.402 1.402 - 1.402


a. Pek. Bekisting Kolom m2 184,440.00 172.80 0.242 169.45 31,252,435.80 0.237 169.45 0.2372 - - 169.45 0.2372 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 6,781.50 0.686 6,781.50 90,397,395.00 0.686 6,781.50 0.6862 - - 6,781.50 0.6862 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 2,210.17 0.224 2,336.58 31,146,668.99 0.236 2,336.58 0.2364 - - 2,336.58 0.2364 100.00
d. Pek. Beton K-300 m3 1,229,960.00 25.92 0.242 25.92 31,880,563.20 0.242 25.92 0.2420 - - 25.92 0.2420 100.00

3 Pek. Kolom K 80x80 cm 3.653 386,555,553.18 2.934 2.934 - 2.934


a. Pek. Bekisting Kolom m2 184,440.00 432.00 0.605 343.72 63,395,716.80 0.481 343.72 0.4812 - - 343.72 0.4812 100.00

7
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

b. Pek. Pembesian Ø 25 kg 13,330.00 17,801.44 1.801 14,241.15 189,834,529.50 1.441 14,241.15 1.4410 - - 14,241.15 1.4410 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,351.27 0.440 3,624.19 48,310,471.68 0.367 3,624.19 0.3667 - - 3,624.19 0.3667 100.00
d. Pek. Beton K-300 m3 1,229,960.00 86.40 0.807 69.12 85,014,835.20 0.645 69.12 0.6453 - - 69.12 0.6453 100.00

BETON PLAT (Elv ± 0.00) 2.932 386,294,188.78 2.932 2.708 - 2.708


1 Pek. Beton Plat tbl 10 cm 2.932 386,294,188.78 2.932 2.708 - 2.708
a. Pek. Pembesian Wiremesh M6 (1 Lapis) m2 32,630.00 1,913.06 0.474 1,913.06 62,423,229.38 0.474 1,756.84 0.4351 - - 1,756.84 0.4351 91.83
a1 Lantai Kerja Tbl 5cm m3 925,970.00 95.65 0.672 95.65 88,571,924.16 0.672 90.03 0.6328 - - 90.03 0.6328 94.12
b. Pek. Beton K-300 m3 1,229,960.00 191.31 1.786 191.31 235,299,035.25 1.786 175.68 1.6402 - - 175.68 1.6402 91.83

BETON TANGGA (Elv ± 0.00) 0.176 23,146,240.61 0.176 0.176 - 0.176


1 Pek. Beton Tangga 0.060 7,949,255.53 0.060 - 0.060 - - - 0.060
a. Pek. Bekisting tangga m2 178,800.00 16.20 0.022 16.20 2,896,560.00 0.022 16.20 0.0220 - - 16.20 0.0220 100.00
b. Pek. Pembesian Ø 10 kg 13,330.00 192.20 0.019 192.20 2,562,026.53 0.019 192.20 0.0194 - - 192.20 0.0194 100.00
c. Pek. Beton K-300 m3 1,229,960.00 2.03 0.019 2.03 2,490,669.00 0.019 2.03 0.0189 - - 2.03 0.0189 100.00

2 Pek. Beton Plat Tangga 0.115 15,196,985.08 0.115 0.115 - 0.115


a. Pek. Bekisting tangga m2 178,800.00 32.25 0.044 32.25 5,765,569.35 0.044 32.25 0.0438 - - 32.25 0.0438 100.00
b. Pek. Pembesian Ø 12 kg 13,330.00 121.45 0.012 121.45 1,618,869.42 0.012 121.45 0.0123 - - 121.45 0.0123 100.00
c. Pek. Pembesian Ø 16 kg 13,330.00 287.32 0.029 287.32 3,829,934.61 0.029 287.32 0.0291 - - 287.32 0.0291 100.00
d. Pek. Beton K-300 m3 1,229,960.00 3.24 0.030 3.24 3,982,611.69 0.030 3.24 0.0302 - - 3.24 0.0302 100.00

II.3.3 ELEVASI + 2.00 0.046 6,101,315.35 0.046 0.046 - 0.046


BETON BORDES TANGGA (Elv + 2.70) 0.046 6,101,315.35 0.046 0.046 - 0.046
1 Pek. Beton Bordes tbl 15 cm 0.046 6,101,315.35 0.046 0.046 - 0.046
a. Pek. Bekisting Plat m2 217,440.00 11.00 0.018 11.00 2,391,840.00 0.018 11.00 0.0182 - - 11.00 0.0182 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 155.93 0.016 155.93 2,078,548.39 0.016 155.93 0.0158 - - 155.93 0.0158 100.00
c. Pek. Beton K-300 m3 1,229,960.00 1.33 0.012 1.33 1,630,926.96 0.012 1.33 0.0124 - - 1.33 0.0124 100.00

II.3.5 ELEVASI + 4.50 17.218 1,780,218,061.67 13.513 12.150 - 12.150


BETON BALOK (Elv + 4.50) 7.468 1,171,342,109.82 8.891 7.528 - 7.528
1 Pek. Balok B 30x60 cm 1.735 196,911,686.86 1.495 1.495 - 1.495
a. Pek. Bekisting Balok m2 185,810.00 388.80 0.548 292.63 54,373,580.30 0.413 292.63 0.4127 - - 292.63 0.4127 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 4,295.34 0.435 4,465.63 59,526,848.97 0.452 4,465.63 0.4519 - - 4,465.63 0.4519 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 3,217.58 0.326 2,374.20 31,648,127.99 0.240 2,374.20 0.2402 - - 2,374.20 0.2402 100.00
d. Pek. Beton K-300 m3 1,229,960.00 45.70 0.427 41.76 51,363,129.60 0.390 41.76 0.3899 - - 41.76 0.3899 100.00

2 Pek. Balok B 40x80 cm 0.875 121,198,600.93 0.920 0.920 - 0.920


a. Pek. Bekisting Balok m2 185,810.00 160.60 0.227 175.74 32,654,249.40 0.248 175.74 0.2479 - - 175.74 0.2479 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 2,395.25 0.242 2,169.83 28,923,800.33 0.220 2,169.83 0.2196 - - 2,169.83 0.2196 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,685.67 0.171 1,530.94 20,407,458.46 0.155 1,530.94 0.1549 - - 1,530.94 0.1549 100.00
d. Pek. Beton K-300 m3 1,229,960.00 25.18 0.235 31.88 39,213,092.74 0.298 31.88 0.2977 - - 31.88 0.2977 100.00

3 Pek. Balok B 120x60 cm - - - - - -


a. Pek. Bekisting Balok m2 185,810.00 - - - - - - - -
b. Pek. Pembesian Ø 19 kg 13,330.00 - - - - - - - -
c. Pek. Pembesian Ø 10 kg 13,330.00 - - - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - - - -

3a B 80x80 (Bentang 12 m, grid G ke I) 0.904 291,283,450.82 2.211 0.848 - 0.848


a. Pek. Bekisting Balok m2 185,810.00 - - 49.50 9,197,595.00 0.070 49.50 0.0698 - - 49.50 0.0698 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 - - 1,510.54 20,135,437.91 0.153 1,510.54 0.1528 - - 1,510.54 0.1528 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 - - 304.25 4,055,693.92 0.031 304.25 0.0308 - - 304.25 0.0308 100.00
d. Pek. Beton K-300 m3 1,229,960.00 - - 14.40 17,711,424.00 0.134 14.40 0.1344 - - 14.40 0.1344 100.00
3b Fabrikasi dan Pemasangan struktur Balok Entrance IWF.300.150.6,5 kg 35,000.00 - - - - - - - - -
3c Fabrikasi dan Pemasangan struktur Baja IWF.300.150.5,5.8 Depan kg 35,000.00 3,402.92 0.904 3,402.92 119,102,287.50 0.904 865.55 0.2300 - - 865.55 0.2300 25.44
3d Fabrikasi dan Pemasangan struktur Baja IWF.300.150.5,5.8 Belakang kg 35,000.00 - - 3,459.46 121,081,012.50 0.919 865.55 0.2300 - - 865.55 0.2300 25.02

4 Pek. Balok B 45x90 cm 0.182 52,225,699.29 0.396 0.396 - 0.396


a. Pek. Bekisting Balok m2 185,810.00 27.00 0.038 44.26 8,223,393.17 0.062 44.26 0.0624 - - 44.26 0.0624 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 504.76 0.051 1,281.93 17,088,066.12 0.130 1,281.93 0.1297 - - 1,281.93 0.1297 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 475.36 0.048 1,166.30 15,546,826.69 0.118 1,166.30 0.1180 - - 1,166.30 0.1180 100.00
d. Pek. Beton K-300 m3 1,229,960.00 4.74 0.044 9.24 11,367,413.32 0.086 9.24 0.0863 - - 9.24 0.0863 100.00

8
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

5 Pek. Balok B 35x70 cm 2.828 358,563,093.54 2.722 2.722 - 2.722


a. Pek. Bekisting Balok m2 185,810.00 507.50 0.716 438.11 81,405,590.72 0.618 438.11 0.6179 - - 438.11 0.6179 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 8,650.33 0.875 9,516.79 126,858,773.38 0.963 9,516.79 0.9630 - - 9,516.79 0.9630 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 5,841.26 0.591 4,758.09 63,425,363.18 0.481 4,758.09 0.4814 - - 4,758.09 0.4814 100.00
d. Pek. Beton K-300 m3 1,229,960.00 69.20 0.646 70.63 86,873,366.26 0.659 70.63 0.6594 - - 70.63 0.6594 100.00

6 Pek. Balok B 50x100 cm 0.944 151,159,578.39 1.147 1.147 - 1.147


a. Pek. Bekisting Balok m2 185,810.00 156.00 0.220 124.34 23,103,243.78 0.175 124.34 0.1754 - - 124.34 0.1754 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 3,208.02 0.325 3,364.70 44,851,426.87 0.340 3,364.70 0.3405 - - 3,364.70 0.3405 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 1,121.27 0.113 3,627.92 48,360,140.94 0.367 3,627.92 0.3671 - - 3,627.92 0.3671 100.00
d. Pek. Beton K-300 m3 1,229,960.00 30.65 0.286 28.33 34,844,766.80 0.264 28.33 0.2645 - - 28.33 0.2645 100.00

BETON KOLOM (Elv + 4.50 - Elv ± 8,50 dan ± 9,50) Grid A-D, Kelas 4.683 228,891,048.15 1.737 1.737 - 1.737
1 Pek. Kolom K 50x80 cm 0.266 19,767,328.52 0.150 0.150 - 0.150
a. Pek. Bekisting Kolom m2 184,440.00 26.00 0.036 19.50 3,596,580.00 0.027 19.50 0.0273 - - 19.50 0.0273 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 1,525.84 0.154 678.15 9,039,739.50 0.069 678.15 0.0686 - - 678.15 0.0686 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 371.75 0.038 239.70 3,195,137.02 0.024 239.70 0.0243 - - 239.70 0.0243 100.00
d. Pek. Beton K-300 m3 1,229,960.00 4.00 0.037 3.20 3,935,872.00 0.030 3.20 0.0299 - - 3.20 0.0299 100.00

2 Pek. Kolom K 60x60 cm 1.096 78,749,063.00 0.598 0.598 - 0.598


a. Pek. Bekisting Kolom m2 184,440.00 120.00 0.168 79.38 14,640,847.20 0.111 79.38 0.1111 - - 79.38 0.1111 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 5,702.63 0.577 2,620.13 34,926,266.25 0.265 2,620.13 0.2651 - - 2,620.13 0.2651 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,811.03 0.183 1,059.81 14,127,239.15 0.107 1,059.81 0.1072 - - 1,059.81 0.1072 100.00
d. Pek. Beton K-300 m3 1,229,960.00 18.00 0.168 12.24 15,054,710.40 0.114 12.24 0.1143 - - 12.24 0.1143 100.00

3 Pek. Kolom K 80x80 cm 3.321 130,374,656.64 0.990 0.990 - 0.990


a. Pek. Bekisting Kolom m2 184,440.00 128.00 0.179 127.25 23,469,298.35 0.178 127.25 0.1782 - - 127.25 0.1782 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 16,183.13 1.637 4,315.50 57,525,615.00 0.437 4,315.50 0.4367 - - 4,315.50 0.4367 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 6,011.02 0.608 1,342.29 17,892,767.29 0.136 1,342.29 0.1358 - - 1,342.29 0.1358 100.00
e. Pek. Beton K-300 m3 1,229,960.00 96.00 0.896 25.60 31,486,976.00 0.239 25.60 0.2390 - - 25.60 0.2390 100.00

BETON PLAT (Elv + 4.50) 5.067 379,984,903.69 2.884 2.884 - 2.884


1 Pek. Beton plat tbl 12 cm 5.067 379,984,903.69 2.884 2.884 - 2.884
a. Pek. Bekisting Plat m2 217,440.00 1,293.60 2.135 630.33 137,058,422.47 1.040 630.33 1.0404 - - 630.33 1.0404 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 14,647.00 1.482 11,244.80 149,893,160.41 1.138 11,244.80 1.1378 - - 11,244.80 1.1378 100.00
c. Pek. Beton K-300 m3 1,229,960.00 155.23 1.449 75.64 93,033,320.81 0.706 75.64 0.7062 - - 75.64 0.7062 100.00

II.3.6 ELEVASI + 8.00 - - -


BETON KOLOM (Elv ± 8.00) - - -
1 Pek. Kolom K 50x80 cm - - -
a. Pek. Bekisting Kolom m2 184,440.00 - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - -
c. Pek. Pembesian Ø 10 kg 13,330.00 - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - -

2 Pek. Kolom K 60x60 cm - - -


a. Pek. Bekisting Kolom m2 184,440.00 - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - -

3 Pek. Kolom K 80x80 cm - - -


a. Pek. Bekisting Kolom m2 184,440.00 - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - -
e. Pek. Beton K-300 m3 1,229,960.00 - - - - -

II.3.7 ELEVASI + 8.50 4.413 511,000,194.46 3.879 3.8789 - 3.8789


BETON BALOK (Elv + 8.50) 3.146 370,760,486.63 2.814 2.8144 - 2.8144
1 Pek. Balok B 35x70 cm 2.190 271,679,922.57 2.062 2.0623 - 2.0623
a. Pek. Bekisting Balok m2 185,810.00 392.95 0.554 318.06 59,097,985.36 0.449 318.06 0.4486 - - 318.06 0.4486 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 6,697.74 0.678 6,861.75 91,467,069.02 0.694 6,861.75 0.6943 - - 6,861.75 0.6943 100.00

9
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

c. Pek. Pembesian Ø 12 kg 13,330.00 4,526.65 0.458 4,510.85 60,129,638.52 0.456 4,510.85 0.4564 - - 4,510.85 0.4564 100.00
d. Pek. Beton K-300 m3 1,229,960.00 53.58 0.500 49.58 60,985,229.68 0.463 49.58 0.4629 - - 49.58 0.4629 100.00

2 Pek. Balok B 45x90 cm 0.956 99,080,564.05 0.752 0.7521 - 0.7521


a. Pek. Bekisting Balok m2 185,810.00 147.15 0.208 96.53 17,935,310.25 0.136 96.53 0.1361 - - 96.53 0.1361 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 2,750.93 0.278 2,833.06 37,764,626.11 0.287 2,833.06 0.2867 - - 2,833.06 0.2867 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 2,258.51 0.229 1,338.28 17,839,278.33 0.135 1,338.28 0.1354 - - 1,338.28 0.1354 100.00
d. Pek. Beton K-300 m3 1,229,960.00 25.85 0.241 20.77 25,541,349.36 0.194 20.77 0.1939 - - 20.77 0.1939 100.00

BETON PLAT (Elv + 8.50) 1.267 140,239,707.83 1.065 1.0645 - 1.0645


1 Pek. Beton Plat tbl 10 cm 1.267 140,239,707.83 1.065 1.0645 - 1.0645
a. Pek. Bekisting plat m2 217,440.00 327.12 0.540 244.89 53,248,881.60 0.404 244.89 0.4042 - - 244.89 0.4042 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 4,168.69 0.422 4,266.34 56,870,335.79 0.432 4,266.34 0.4317 - - 4,266.34 0.4317 100.00
c. Pek. Beton K-300 m3 1,229,960.00 32.71 0.305 24.49 30,120,490.44 0.229 24.49 0.2286 - - 24.49 0.2286 100.00

II.3.8 ELEVASI + 11.00 5.160 422,164,991.54 3.205 3.205 - 3.205


BETON KOLOM (Elv ± 0.00 - Elv + 11.00) Grid L-M, Café 1.085 267,523,575.90 2.031 2.031 - 2.031
1 Pek. Kolom K 60x60 cm - - -
a. Pek. Bekisting Kolom m2 184,440.00 - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - -

1a Pek. Kolom K 50x80 cm 0.491 51,694,513.96 0.392 0.3924 - 0.3924


a. Pek. Bekisting Kolom m2 184,440.00 62.40 0.087 56.56 10,431,926.40 0.079 56.56 0.0792 - - 56.56 0.0792 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 2,034.45 0.206 1,864.91 24,859,283.63 0.189 1,864.91 0.1887 - - 1,864.91 0.1887 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 1,070.64 0.108 418.58 5,579,655.94 0.042 418.58 0.0424 - - 418.58 0.0424 100.00
d. Pek. Beton K-300 m3 1,229,960.00 9.60 0.090 8.80 10,823,648.00 0.082 8.80 0.0822 - - 8.80 0.0822 100.00

2 Pek. Kolom K 80x80 cm 0.594 215,829,061.94 1.638 1.6383 - 1.6383


a. Pek. Bekisting Kolom m2 184,440.00 76.80 0.108 208.96 38,540,582.40 0.293 208.96 0.2926 - - 208.96 0.2926 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 2,589.30 0.262 7,120.58 94,917,264.75 0.720 7,120.58 0.7205 - - 7,120.58 0.7205 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 801.47 0.081 2,281.90 30,417,704.39 0.231 2,281.90 0.2309 - - 2,281.90 0.2309 100.00
e. Pek. Beton K-300 m3 1,229,960.00 15.36 0.143 42.24 51,953,510.40 0.394 42.24 0.3944 - - 42.24 0.3944 100.00

BETON BALOK (Elv + 11.00) 3.192 102,986,567.88 0.7817 0.7817 - 0.7817


1 Pek. Balok B 30x60 cm 0.998 - -
a. Pek. Bekisting Balok m2 185,810.00 223.38 0.315 - - -
b. Pek. Pembesian Ø 16 kg 13,330.00 2,467.83 0.250 - - -
c. Pek. Pembesian Ø 10 kg 13,330.00 1,854.37 0.188 - - -
d. Pek. Beton K-300 m3 1,229,960.00 26.26 0.245 - - -

2 Pek. Balok B 40x80 cm 2.194 102,986,567.88 0.782 0.782 - 0.782


a. Pek. Bekisting Balok m2 185,810.00 403.32 0.569 133.40 24,787,054.00 0.188 133.40 0.1882 - - 133.40 0.1882 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 6,015.26 0.609 2,413.57 32,172,899.66 0.244 2,413.57 0.2442 - - 2,413.57 0.2442 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,211.38 0.426 1,483.45 19,774,347.98 0.150 1,483.45 0.1501 - - 1,483.45 0.1501 100.00
d. Pek. Beton K-300 m3 1,229,960.00 63.23 0.590 21.34 26,252,266.24 0.199 21.34 0.1993 - - 21.34 0.1993 100.00

BETON PLAT (Elv + 11.00) 0.884 51,654,847.75 0.392 0.3921 - 0.3921


1 Pek. Beton Plat tbl 10 cm 0.884 51,654,847.75 0.392 0.3921 - 0.3921
a. Pek. Bekisting plat m2 217,440.00 258.93 0.427 61.34 13,338,639.36 0.101 61.34 0.1013 - - 61.34 0.1013 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 2,222.53 0.225 2,308.41 30,771,141.77 0.234 2,308.41 0.2336 - - 2,308.41 0.2336 100.00
c. Pek. Beton K-300 m3 1,229,960.00 24.79 0.231 6.13 7,545,066.62 0.057 6.13 0.0573 - - 6.13 0.0573 100.00

II.3.9 ELEVASI + 11.50 9.037 1,094,455,033.27 8.308 8.3078 - 8.3078


BETON KOLOM (Elv ± 4.50 - Elv ± 11.50 dan ± 12.50) Grid E-K, Aula 4.803 535,610,132.50 4.066 4.0657 - 4.0657
1 Pek. Kolom K 60x60 cm 1.238 130,016,849.95 0.987 0.9869 - 0.9869
a. Pek. Bekisting Kolom m2 184,440.00 153.60 0.215 130.74 24,112,763.40 0.183 130.74 0.1830 - - 130.74 0.1830 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 5,548.50 0.561 4,315.50 57,525,615.00 0.437 4,315.50 0.4367 - - 4,315.50 0.4367 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 2,173.24 0.220 1,769.13 23,582,477.95 0.179 1,769.13 0.1790 - - 1,769.13 0.1790 100.00
d. Pek. Beton K-300 m3 1,229,960.00 25.92 0.242 20.16 24,795,993.60 0.188 20.16 0.1882 - - 20.16 0.1882 100.00

2 Pek. Kolom K 80x80 cm 3.564 405,593,282.55 3.079 3.0788 - 3.0788

10
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

a. Pek. Bekisting Kolom m2 184,440.00 460.80 0.645 395.76 72,993,820.70 0.554 395.76 0.5541 - - 395.76 0.5541 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 15,535.80 1.572 13,378.05 178,329,406.50 1.354 13,378.05 1.3537 - - 13,378.05 1.3537 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,808.82 0.487 4,250.59 56,660,429.75 0.430 4,250.59 0.4301 - - 4,250.59 0.4301 100.00
d. Pek. Beton K-300 m3 1,229,960.00 92.16 0.860 79.36 97,609,625.60 0.741 79.36 0.7409 - - 79.36 0.7409 100.00

BETON BALOK (Elv + 11.50) 2.498 387,471,975.03 2.941 2.9412 - 2.9412


1 Pek. Balok B 35x70 cm 1.830 300,191,172.95 2.279 2.2787 - 2.2787
a. Pek. Bekisting Balok m2 185,810.00 310.21 0.438 310.21 57,639,191.05 0.438 310.21 0.4375 - - 310.21 0.4375 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 6,452.67 0.653 6,452.67 86,014,035.18 0.653 6,452.67 0.6529 - - 6,452.67 0.6529 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 3,306.66 0.335 3,442.70 45,891,161.27 0.348 3,442.70 0.3484 - - 3,442.70 0.3484 100.00
d. Pek. Beton K-300 m3 1,229,960.00 43.43 0.405 43.43 53,415,563.85 0.405 43.43 0.4055 - - 43.43 0.4055 100.00
1a Fabrikasi dan Pemasangan Struktur Baja IWF 350.175.6,9 kg 35,000.00 - - 1,635.18 57,231,221.60 0.434 1,635.18 0.4344 - - 1,635.18 0.4344 100.00

2 Pek. Balok B 30x50 cm 0.667 87,280,802.08 0.663 0.6625 - 0.6625


a. Pek. Bekisting Balok m2 185,810.00 151.42 0.214 151.42 28,136,093.44 0.214 151.42 0.2136 - - 151.42 0.2136 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 1,731.52 0.175 1,731.52 23,081,143.86 0.175 1,731.52 0.1752 - - 1,731.52 0.1752 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 1,137.57 0.115 1,093.30 14,573,703.66 0.111 1,093.30 0.1106 - - 1,093.30 0.1106 100.00
d. Pek. Beton K-300 m3 1,229,960.00 17.47 0.163 17.47 21,489,861.12 0.163 17.47 0.1631 - - 17.47 0.1631 100.00

BETON PLAT (Elv + 11.50) 1.736 171,372,925.74 1.301 1.3009 - 1.3009


1 Pek. Beton Plat tbl 10 cm 1.736 171,372,925.74 1.301 1.3009 - 1.3009
a. Pek. Bekisting plat m2 217,440.00 463.36 0.765 302.82 65,844,202.32 0.500 302.82 0.4998 - - 302.82 0.4998 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 5,327.38 0.539 5,122.55 68,283,628.18 0.518 5,122.55 0.5183 - - 5,122.55 0.5183 100.00
c. Pek. Beton K-300 m3 1,229,960.00 46.34 0.433 30.28 37,245,095.24 0.283 30.28 0.2827 - - 30.28 0.2827 100.00

III PEKERJAAN ARSITEKTUR 23.592 3,970,460,706.10 30.139 7.2677 1.4855 8.7533


III.1 LANTAI SATU 0.873 417,023,516.32 3.166 0.2409 - 0.2409
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.791 406,233,930.07 3.084 0.2409 - 0.2409
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I Posisi :
1.a m2 350,651.00 80.86 0.215 80.86 28,352,237.26 0.215 - - - - - - -
Dibawah Curtain Wall
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I Posisi : Area
1.b m2 350,651.00 - - 317.53 111,340,497.19 0.845 - - - - - - -
Café dan Teras Belakang
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Unpolish Type I Posisi : Area
1.c m2 350,651.00 - - 360.00 126,234,360.00 0.958 - - - - - - -
Carport Depan
2 Pek. Urugan Pasir tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 230,890.00 3.11 0.005 3.11 717,698.48 0.005 3.11 0.0054 - - 3.11 0.0054 100.00
3 Pek. Lantai kerja tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 925,970.00 3.11 0.022 3.11 2,878,285.15 0.022 3.11 0.0218 - - 3.11 0.0218 100.00
4 Pek. Pasangan Rollag 1 Bata m2 229,460.00 102.48 0.178 102.48 23,515,060.80 0.178 102.48 0.1785 - - 102.48 0.1785 100.00
5 Pek. Plesteran 1:4 m2 45,160.00 102.48 0.035 102.48 4,627,996.80 0.035 102.48 0.0351 - - 102.48 0.0351 100.00
6 Ramp Depan -
a Pek. Tanah Timbun m2 176,710.00 55.00 0.074 55.97 9,890,105.28 0.075 - - - - - - -
b Pek. Wiremesh M6 kg 32,630.00 144.50 0.036 136.08 4,440,290.40 0.034 - - - - - - -
c Pek. Beton K300 m3 1,229,960.00 15.32 0.143 68.04 83,686,478.40 0.635 - - - - - - -
d Pek. Pas 1/2 Bata untuk Cansteen m2 117,100.00 14.45 0.013 14.45 1,691,860.80 0.013 - - - - - - -
e Pek. Plesteran 1:4 m2 45,160.00 20.71 0.007 14.45 652,471.68 0.005 - - - - - - -
f Pek. Besi Siku 40.40.4 kg 13,330.00 615.65 0.062 615.65 8,206,587.84 0.062 - - - - - - -

III.1.2 PEKERJAAN TANGGA 0.082 10,789,586.25 0.082 - - -


1 Tangga Naik ke teras
a Pek. Galian Tanah m3 82,220.00 3.50 0.002 3.50 288,161.16 0.002 - - - - - - -
b Pek. Urugan Pasir tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 230,890.00 1.17 0.002 1.17 269,737.82 0.002 - - - - - - -
c Pek. Lantai kerja tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 925,970.00 1.17 0.008 1.17 1,081,766.77 0.008 - - - - - - -
d Pasangan Bata 1 batu camp 1:2 m2 229,460.00 38.94 0.068 38.94 8,935,573.96 0.068 - - - - - - -
e Pek. Timbunan m3 32,890.00 4.33 0.001 4.33 142,424.31 0.001 - - - - - - -
f Pek. Urugan Pasir tbl 5 cm Posisi : Dibawah Plat Lantai Tangga m3 230,890.00 0.31 0.001 0.31 71,922.24 0.001 - - - - - - -

III.2 FINISHING LUAR GEDUNG 22.719 3,553,437,189.79 26.973 7.0268 1.4855 8.5124
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 7.728 1,434,871,225.63 10.892 1.3803 328.815 1.4855 2.8659
1 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm
aluminium skin 0.3 mm tkdn 61%
a Posisi : Tampak Luar Bangunan pada kolom dan balok silang m2 595,180.00 965.64 4.363 1,662.41 989,430,207.90 7.511 248.28 1.122 136.02 0.615 384.30 1.7362 23.12
b Posisi : leher atap dan background logo m2 595,180.00 407.20 1.840 407.20 242,357,296.00 1.840 - - 192.80 0.871 192.80 0.8710 47.35
c Posisi : Keliling sisi samping atap m2 595,180.00 25.25 0.114 25.25 15,027,104.64 0.114 - - - - - - -
d Posisi : Plafond Atap m2 595,180.00 - - - - - - - - - - - -

11
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
2 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm m2 595,180.00 226.00 1.021 226.00 134,510,680.00 1.021 - - - - - - -

3 Pek. Pemasangan 1/2 Bata


a Posisi : Elev + 8.50 m2 117,100.00 46.67 0.041 46.51 5,446,344.42 0.041 37.34 0.0332 - - 37.34 0.0332 80.27
b Posisi : Elev + 11.50 m2 117,100.00 31.92 0.028 63.84 7,475,734.26 0.057 23.94 0.0213 - 23.94 0.0213 37.50
c Posisi : Elev + 11.50 Bentang 18 m ( I.3-I7A dan G3- G7A) m2 117,100.00 95.58 0.085 77.11 9,029,815.20 0.069 71.69 0.0637 - - 71.69 0.0637 92.96
4 Pek. Plesteran 45,160.00 174.17 0.060 187.46 8,465,820.05 0.064 52.25 0.0179 - - 52.25 0.0179 27.87
5 Pek. Balok Latei Penahan Bata
a Pek. Bekisting Balok m2 185,810.00 23.49 0.033 23.49 4,363,896.50 0.033 17.62 0.0248 - - 17.62 0.0248 75.01
b Pek. Pembesian Ø 8 kg 13,330.00 142.56 0.014 142.56 1,900,357.05 0.014 106.92 0.0108 - - 106.92 0.0108 75.00
c Pek. Pembesian Ø 6 kg 13,330.00 955.24 0.097 955.24 12,733,342.87 0.097 716.43 0.0725 - - 716.43 0.0725 75.00
d Pek. Beton K =175 m3 925,970.00 1.54 0.011 1.54 1,425,927.13 0.011 - - - - - - -
6 Pek. Kolom Praktis Penahan Bata
a Pek. Bekisting Balok m2 184,440.00 3.12 0.004 3.12 575,452.80 0.004 2.34 0.0033 - - 2.34 0.0033 75.00
b Pek. Pembesian Ø 8 kg 13,330.00 18.94 0.002 18.94 252,476.31 0.002 14.21 0.0014 - - 14.21 0.0014 75.00
c Pek. Pembesian Ø 6 kg 13,330.00 126.90 0.013 126.90 1,691,576.54 0.013 95.18 0.0096 - - 95.18 0.0096 75.00
d Pek. Beton K =175 m3 925,970.00 0.20 0.001 0.20 185,193.96 0.001 - - - - - - -

III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 8.804 1,279,262,448.96 9.711 1.4703 - 1.4703
Lengkap dengan Accessories dan berfungsi dengan baik

1 Pek. Pengadaan dan Pemasangan Pintu Kaca 2 Daun (Frame less) Posisi : Lantai unit 5,540,700.00 2.00 0.084 2.00 11,081,400.00 0.084 - - - - - -

Pek. Pengadaan dan Pemasangan Pintu Kaca 1 Daun Posisi : Lantai 1 (Pintu
2 unit 2,750,340.00 1.00 0.021 1.00 2,750,340.00 0.021 - - - - - -
Masuk)
3 Pek. Curtain Wall type 1 - T = 11.50 m Posisi : area hall dll m2 804,122.00 916.20 5.592 1,064.10 855,666,220.20 6.495 240.89 1.4703 - - 240.89 1.4703 22.64
4 Pek. Curtain Wall type 2 - T = 8.50 m Posisi : area kelas dll m2 804,122.00 509.01 3.107 509.58 409,764,488.76 3.110 - - - - - - -

III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 6.187 839,303,515.20 6.371 4.1762 - 4.1762
Posisi : area atap area tengah

1 Pabrikasi dan pemasangan struktur Kolom rangka baja dan atap WF termasuk z kg 35,000.00 17,465.47 4.640 18,157.45 635,510,904.00 4.824 15,718.92 4.1762 - - 15,718.92 4.1762 86.57

2 Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 l m2 207,144.00 722.30 1.136 722.30 149,620,111.20 1.136 - - - - - - -

3 Pek. Aluminium foil insulasi atap [thermal foam 5 mm] m2 75,000.00 722.30 0.411 722.30 54,172,500.00 0.411 - - - - - - -

IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.639 258,560,814.05 1.963 0.119 - 0.119
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.042 5,484,600.00 0.042 - - -
IV.1.1 SHAFT PIPA 0.042 5,484,600.00 0.042 - - -
1 Pipa PPR PN-10 Dia. 2 Inci pada shaft Gedung Utama m' 365,640.00 15.00 0.042 15.00 5,484,600.00 0.042 - - - - - - -

IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.196 25,358,577.75 0.192 0.036 - 0.036
IV.2.1 SHAFT PIPA 0.051 1,796,008.50 0.014 - - -
1 PVC AW Dia.4 Inci Shaft Gedung Utama M' 128,227.00 25.00 0.024 9.00 1,154,043.00 0.009 - - - - - - -
2 PVC AW Dia.3 Inci Shaft Gedung Utama M' 71,329.50 25.00 0.014 9.00 641,965.50 0.005 - - - - - - -
3 PVC D Dia.3 Inci Shaft Gedung Utama M' 59,655.20 30.00 0.014 - - - - - - - - - -

IV.2.2 LANTAI SATU GEDUNG UTAMA 0.081 9,994,701.75 0.076 0.036 - 0.036
1 PVC AW Dia.4 Inci M' 128,227.00 30.00 0.029 42.00 5,385,534.00 0.041 30.000 0.029 - - 30.000 0.029 71.429
2 PVC AW Dia.3 Inci M' 71,329.50 12.00 0.006 45.00 3,209,827.50 0.024 12.000 0.006 - - 12.000 0.006 26.67
3 PVC AW Dia.2 Inci M' 41,085.00 60.00 0.019 25.00 1,027,125.00 0.008 - - - - - - -
4 PVC D Dia.2 Inci M' 35,359.50 70.00 0.019 - - - - - - - - - -
5 PVC D Dia.1,5 Inci M' 27,571.50 16.00 0.003 13.50 372,215.25 0.003 - - - - - - -
6 PVC D Dia.1,25 Inci M' 22,951.50 24.00 0.004 - - - - - - - - - -

IV.2.3 LANTAI DUA GEDUNG UTAMA 0.064 5,795,328.00 0.044 - - -


1 PVC AW Dia.4 Inci M' 128,227.00 30.00 0.029 30.00 3,846,810.00 0.029 - - - - - - -
2 PVC AW Dia.3 Inci M' 71,329.50 12.00 0.006 20.00 1,426,590.00 0.011 - - - - - - -
3 PVC AW Dia.2 Inci M' 41,085.00 24.00 0.007 6.00 246,510.00 0.002 - - - - - - -
4 PVC D Dia.2 Inci M' 35,359.50 50.00 0.013 - - - - - - - - - -
5 PVC D Dia.1,25 Inci M' 22,951.50 25.00 0.004 12.00 275,418.00 0.002 - - - - - - -
6 VENT CAP Dia.3 Inci Bh 175,000.00 2.00 0.003 - - - - - - - - - -

IV.2.4 LANTAI TIGA GEDUNG UTAMA - 7,772,539.50 0.059 - - -


1 Panel Penerangan (PP Lt.3) (Item Baru) Bh 7,772,539.50 - - 1.00 7,772,539.50 0.059 - - - - - - -

12
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM III ADDENDUM IV
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

IV.3 INSTALASI PEMIPAAN AIR HUJAN 0.401 49,359,309.00 0.375 0.084 - 0.084
IV.3.1 PIPA TEGAK 0.084 33,980,155.00 0.258 0.084 - 0.084
1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 86.00 0.084 265.00 33,980,155.00 0.258 86.000 0.084 - - 86.000 0.084 32.453

IV.3.2 LANTAI DAK FFL. ±12.00 0.055 972,908.00 0.007 - - -


1 Roof Drain 4'' BH 115,000.00 18.00 0.016 4.00 460,000.00 0.003 - - - - - - -
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 40.00 0.039 4.00 512,908.00 0.004 - - - - - - -

IV.3.3 LANTAI DAK FFL. ±8.00 0.074 769,362.00 0.006 - - -


2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 76.00 0.074 6.00 769,362.00 0.006 - - - - - - -

IV.3.4 LANTAI DUA 0.074 - - - - -


1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 76.00 0.074 - - - - - - - - - -

IV.3.5 LANTAI SATU 0.115 7,693,620.00 0.058 - - -


1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 60.00 0.058 60.00 7,693,620.00 0.058 - - - - - - -
2 Pipa PVC Dia.12 Inci Class AW M' 371,563.50 20.00 0.056 - - - - - - - - - -

IV.3.6 LANTAI DAK FFL. ±14.50 - 5,943,264.00 0.045 - - -


1 Roof Drain 4'' (Item Baru) BH 115,000.00 - - 16.00 1,840,000.00 0.014 - - - - - - -
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 - - 32.00 4,103,264.00 0.031 - - - - - - -

IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK - 123,801,466.80 0.940 - - -
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 - 31,057,873.50 0.236 - - -
1 FREZA ARTNRL-225 18 Watt 3000K (Item Baru) buah 750,000.00 - - 30.00 22,500,000.00 0.171 - - - - - - -
2 Instalasi titik lampu NYM 3x2,5 mm2 + PVC high impact conduit Ø 20 (Item Baru) titik 285,262.45 - - 30.00 8,557,873.50 0.065
- - - - - - -
mm

IV.4.2 FASADE - 92,743,593.30 0.704 - - -


1 LED STRIP VF 1000 72W (STRIPLIGHT ALD LED 72W 3000K) (Item Baru) M' 1,733,916.25 - - 45.00 78,026,231.25 0.592 - - - - - - -
2 DRIVER 0T Z90 (POWER SUPPLY LED TAPE ALD 72W) (Item Baru) buah 1,350,000.00 - - 9.00 12,150,000.00 0.092 - - - - - - -
Instalasi titik lampu NYM 3x2,5 mm2 + PVC high impact conduit Ø 20
3 (Item Baru) titik 285,262.45 - - 9.00 2,567,362.05 0.019 - - - - - - -
mm

IV.5 PEKERJAAN PENANGKAL PETIR - 54,556,860.50 0.414 - - -


IV.5.1 GEDUNG UTAMA (Pengadaan dan pemasangan peralatan penangkal petir) - 54,556,860.50 0.414 - - -
1 Tipe elektrostatik Radius 85 M (Item Baru) set 37,056,860.50 - - 1.00 37,056,860.50 0.281 - - - - - - -
2 Grounding termasuk Cooper Max 2 ohm, Cooper Rood dan bak kontrol (Item Baru) set 17,500,000.00 - - 1.00 17,500,000.00 0.133 - - - - - - -

JUMLAH 100.000 13,173,857,180.12 100.000 - 73.3540 - 1.4855 - 74.8395 -


PPN 10% 1,317,385,718.01
TOTAL 14,491,242,898.13
PEMBULATAN 14,491,242,898.00

Pekanbaru, 26 Desember 2021


Dibuat Oleh :
Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING

Choirus Subechan, ST., M.Si


Team Leader

13
JENIS PEKERJAAN : Biaya Penyelenggara SMK3 MINGGU
SATUAN PEMBAYAR : Ls XXI
URAIAN ANALISA HARGA SATUAN

KEMAJUAN PEKERJAAN

JUMLAH HARGA PENYELESAIAN PEK. s/d PENYELESAIAN PEK. PENYELESAIAN PEK. s/d Bobot
PERKIRAAN HARGA SATUAN BOBOT MINGGU LALU MINGGU INI MINGGU INI Terhadap
No URAIAN SAT (%) Kontrak
KUANTITAS (Rp)
(Rp) [%]
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT

1 2 3 4 5 6 7 8 9 10 11 12 13 14

I. Penyiapan RK3K terdiri atas :


a. Pembuatan Manual Prosedur Instruksi Kerja,
Set 1.00 2,000,000 2,000,000 0.9978 - - 0.95 0.9479 0.95 0.9479 95.00
Ijin Kerja
b. Pembuatan Kartu Identitas Pekerja (KIP) Lb -
Sub Jumlah 1 2,000,000 0.9978 - 0.9479 0.9479
2 Sosialisasi dan Promosi K3 terdiri atas :
a. Induksi K3 (Safety Induction) Org
b. Pengarahan K3 (Safety Briefing)
Pertemuan Keselamatan (Safety Talk dan/atau
Org 50.00 50,000.00 2,500,000.00 1.2472 40.00 0.9978 10.00 0.2494 50.00 1.2472 100.00
Tool Box meeting)
c. Pelatihan K3 Org 2.00 1,500,000.00 3,000,000.00 1.4966 1.00 0.7483 1.00 0.7483 2.00 1.4966 100.00
d. Simulasi K3 Org 50.00 50,000.00 2,500,000.00 1.2472 40.00 0.9978 10.00 0.2494 50.00 1.2472 100.00
e. Spanduk (Banner) Lb 5.00 50,000.00 250,000.00 0.1247 5.00 0.1247 - - 5.00 0.1247 100.00
f. Poster Lb 5.00 50,000.00 250,000.00 0.1247 5.00 0.1247 - - 5.00 0.1247 100.00
g. Papan Informasi Bh 2.00 1,500,000.00 3,000,000.00 1.4966 2.00 1.4966 - - 2.00 1.4966 100.00
Sub Jumlah 2 11,500,000.00 5.7371 4.4899 1.2472 5.7371
3 Alat Pelindung Kerja terdiri atas :
(EI-
Kapasitas = {EI-716 x Mb} Kg
731)
a. Jaring Pengaman (Safety Net) Ls 2.00 10,000,000.00 20,000,000.00 9.9776 - - 1.00 4.9888 1.00 4.9888 50.00
Waktu siklus -
b. Tali Keselamatan (Life Line) Ls 1.00 2,000,000.00 2,000,000.00 0.9978 - - 1.00 0.9978 1.00 0.9978 100.00
- Waktu pengeboran dan pembuangan galian -
c. Penahan Jatuh (Safety Deck) Ls 1.00 10,000,000.00 10,000,000.00 4.9888 - - 1.00 4.9888 1.00 4.9888 100.00
d. Pagar Pengaman (Guard Railling) Ls 1.00 10,000,000.00 10,000,000.00 4.9888 - - - - - -
e. Pembatas Area (Restricted Area) Ls 1.00 10,000,000.00 10,000,000.00 4.9888 - - 1.00 4.9888 1.00 4.9888 100.00
- Waktu lain-lain
T1 15.00 menit
T2 45.00 menit
Koefisien Alat / m' T6 15.00 menit
Sub Jumlah 3 52,000,000.00 25.9416 - 15.9641 15.9641
4 Alat pelindung Diri terdiri atas :
a. Topi Pelindung (Safety Helmet) Bh 35.00 60,000.00 2,100,000.00 1.0476 35.00 1.0476 - - 35.00 1.0476 100.00
b. Pelindung Mata (Goggles Spectacles) Psg 10.00 50,000.00 500,000.00 0.2494 10.00 0.2494 - - 10.00 0.2494 100.00
c. Tameng muka (Face Shield) Bh 10.00 35,000.00 350,000.00 0.1746 10.00 0.1746 - - 10.00 0.1746 100.00
d. Masker Selam (Breathing Apparatus) Bh 25,000.00 - -
e. Pelindung Telinga ( Ear plug, Ear Muff) Psg 40,000.00 - -
f. Pelindung Pernafasan dan Mulut (Masker) Bh 3,000.00 - -
g. Sarung Tangan (Safety Gloves) Psg 35.00 5,000.00 175,000.00 0.0873 35.00 0.0873 - - 35.00 0.0873 100.00
h. Sepatu Keselamatan (Safety shoes) Psg 35.00 25,000.00 875,000.00 0.4365 35.00 0.4365 - - 35.00 0.4365 100.00
i. Penunjang Seluruh Tubuh (Full Body Harness) Bh - - -
j. Jaket Pelampung (Live Vest) Bh - - -
k. Rompi Keselamatan (Safety Vest) Bh 35.00 25,000.00 875,000.00 0.4365 35.00 0.4365 - - 35.00 0.4365 100.00
l. Celemek (Apron/Coveralls) Bh - -
m. Pelindung Jatuh (Fall Arrestter) Bh -
Sub Jumlah 4 4,875,000.00 2.4320 2.4320 - 2.4320
5 Asuransi Dan Perijinan terdiri atas :
a. BPJS Ketenagakerjaan Dan Kesehatan Kerja Ls 1.00 50,000,000.00 50,000,000.00 24.9439 1.00 24.9439 - - 1.00 24.9439 100.00
b. Surat Ijin Kelayakan Alat Alat/Kend -
Lb/
c. Surat Ijin Operator -
Alat
d. Surat Ijin Pengesahan Panitia Pembina
Ls
Keselamatan
dan Kesehatan Kerja (P2K3)
Sub Jumlah 5 50,000,000.00 24.9439 24.9439 - 24.9439
6 Personil K3 terdiri dari :
a. Ahli K3 Bln - --
b. Petugas K3/P3K Bln 5.00 4,000,000.00 20,000,000.00 9.9776 4.00 7.9820 1.00 1.9955 5.00 9.9776 100.00
c. Petugas Tanggap Darurat Bln - --
d. Petugas P3K Bln - --
e. Petugas Pengatur Lalu Lintas (Flagman) Bln - --
f. Petugas Medis Bln - --
Sub Jumlah 6 20,000,000.00 9.9776 7.9820 1.9955 9.9776
7 Fasilitas Sarana Kesehatan :
a. Peralatan P3K (Kotak P3K, Tandu, Tabung
Ls 1.00 10,000,000.00 10,000,000.00 4.9888 0.28 1.3969 0.72 3.5919 1.00 4.9888 100.00
oksigen,
b. RuangObat)
P3K (Tempat Tidur Pasien, Stetoskop,
Ls 1.00 15,000,000.00 15,000,000.00 7.4832 0.88 6.5852 0.12 0.8980 1.00 7.4832 100.00
Timbangan)
c. Peralatan Pengasapan (foggging) Bh 1.00 1,000,000.00 1,000,000.00 0.4989 1.00 0.4989 - - 1.00 0.4989 100.00
d. Obat Pengasapan Ls 1.00 100,000.00 100,000.00 0.0499 1.00 0.0499 - - 1.00 0.0499 100.00
Sub Jumlah 7 26,100,000.00 13.0207 8.5308 4.4899 13.0207
8 Rambu - Rambu terdiri atas :
a. Rambu Petunjuk Bh 10.00 25,000.00 250,000.00 0.1247 10.00 0.1247 - - 10.00 0.1247 100.00
b. Rambu Larangan Bh 5.00 25,000.00 125,000.00 0.0624 5.00 0.0624 - - 5.00 0.0624 100.00
c. Rambu Peringatan Bh 10.00 25,000.00 250,000.00 0.1247 10.00 0.1247 - - 10.00 0.1247 100.00
d. Rambu Kewajiban Bh 5.00 25,000.00 125,000.00 0.0624 5.00 0.0624 - - 5.00 0.0624 100.00
e. Rambu informasi Bh 5.00 25,000.00 125,000.00 0.0624 5.00 0.0624 - - 5.00 0.0624 100.00
f. Rambu Pekerjaan Sementara Bh 10.00 25,000.00 250,000.00 0.1247 10.00 0.1247 - - 10.00 0.1247 100.00
g. Tongkat Pengatur Lalu lintas (Warning Light
Bh 2.00 75,000.00 150,000.00 0.0748 2.00 0.0748 - - 2.00 0.0748 100.00
Sticks)
h. Kerucut Lalu Lintas Bh 10.00 55,000.00 550,000.00 0.2744 10.00 0.2744 - - 10.00 0.2744 100.00
i. Lampu Putar (Rotary Lamp) Bh 2.00 125,000.00 250,000.00 0.1247 2.00 0.1247 - - 2.00 0.1247 100.00
j. Lampu Selang Lalu Lintas Ls 1.00 100,000.00 100,000.00 0.0499 1.00 0.0499 - - 1.00 0.0499 100.00
Sub Jumlah 8 2,175,000.00 1.0851 1.0851 - 1.0851
9 Lain - lain Terkait Pengendalian Resiko K3
a. Alat Pemadam Api Ringan (APAR) - 5 kg Bh 3.00 3,500,000.00 10,500,000.00 5.2382 3.00 5.2382 - - 3.00 5.2382 100.00
b. Sirine Bh 2.00 250,000.00 500,000.00 0.2494 2.00 0.2494 - - 2.00 0.2494 100.00
c. Bendera K3 Bh 3.00 100,000.00 300,000.00 0.1497 3.00 0.1497 - - 3.00 0.1497 100.00
d. Jalur Evakuasi (Escape Route) Ls 2.00 5,000,000.00 10,000,000.00 4.9888 2.00 4.9888 - - 2.00 4.9888 100.00
e. Lampu Darurat (Emergency Lamp) Bh 4.00 125,000.00 500,000.00 0.2494 4.00 0.2494 - - 4.00 0.2494 100.00
f. Program Inspeksi dan Audit Internal Ls 1.00 5,000,000.00 5,000,000.00 2.4944 - - 0.95 2.3697 0.95 2.3697 95.00
g. Pelaporan dan Penyelidikan Insiden Ls 1.00 5,000,000.00 5,000,000.00 2.4944 - - 0.95 2.3697 0.95 2.3697 95.00
Sub Jumlah 9 31,800,000.00 15.8643 10.8755 4.7393 15.6149

TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 200,450,000.00 100.00 60.34 29.38 89.72

14
REKAPITULASI LAPORAN MINGGUAN

KEGIATAN : PEMBANGUNAN QUR'AN CENTRE PELAKSANA : PT. CIPTA ADHI GUNA


PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE MK : PT. TUJUH JAYA KONSULTAN, KSO
LOKASI : PEKANBARU PT. PANCA MANDIRI ENGINEERING
T.A : 2021 MINGGU KE : XXII [DUA PULUH DUA]
DARI TANGGAL : 27 Desember 2021
SAMPAI TGL. : 30 Desember 2021

ADDENDUM ADDENDUM LAPORAN KEMAJUAN PEKERJAAN


KONTRAK MC-0
III IV S/D MINGGU LALU MINGGU INI S/D MINGGU INI
NO URAIAN PEKERJAAN PRESTASI (%)
BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%)

1 2 4 4 5 6 7 8 9

I PEKERJAAN PERSIAPAN 1.7940 1.7989 1.8932 1.8932 1.7272 0.1661 1.8932 100.00

II PEKERJAAN STRUKTUR 68.5164 70.2150 73.8759 66.0052 64.2397 1.7655 66.0052 89.35
II.1 PEKERJAAN TANAH 1.2776 0.5727 1.2753 1.2859 1.2859 - 0.0000 1.2859 100.83
II.1A PEKERJAAN LANTAI - 2.0312 2.0446 2.0446 1.8665 0.1781 2.0446 100.00

II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 24.0566 25.5935 23.2968 23.1694 23.1694 - 0.0000 23.1694 99.45
II.2.1 PEKERJAAN PONDASI DALAM 14.5831 16.1200 15.4325 15.4325 15.4325 - 0.0000 15.4325 100.00
II.2.2 PEKERJAAN BETON PILE CAP 2.8656 2.8656 3.1219 3.1219 3.1219 - 0.0000 3.1219 100.00
II.2.3 PEKERJAAN BETON SLOOF 6.6080 6.6080 4.7424 4.6150 4.6150 - 0.0000 4.6150 97.31

II.3 PEKERJAAN BETON STRUKTUR ATAS 43.1822 42.0175 47.2591 39.5052 37.9178 1.5874 39.5052 83.59
II.3.1 BETON KOLOM PEDESTAL 2.5382 2.1986 2.8610 2.9243 2.9243 - 0.0000 2.9243 102.21
II.3.2 ELEVASI ± 0.00 6.6478 6.6478 8.5240 7.6301 7.4060 0.2241 7.6301 89.51
II.3.3 ELEVASI + 2.00 0.0807 0.0807 0.0463 0.0463 0.0463 - 0.0000 0.0463 100.00
II.3.5 ELEVASI + 4.50 15.4527 14.6275 17.2176 13.5133 12.1500 1.3633 13.5133 78.48
II.3.6 ELEVASI + 8.00 3.1040 3.1040 - - - - -
II.3.7 ELEVASI + 8.50 4.4902 4.4902 4.4131 3.8789 3.8789 - 0.0000 3.8789 87.89
II.3.8 ELEVASI + 11.00 4.4249 4.4249 5.1605 3.2046 3.2046 - 0.0000 3.2046 62.10
II.3.9 ELEVASI + 11.50 6.4438 6.4438 9.0365 8.3078 8.3078 - 0.0000 8.3078 91.94

III PEKERJAAN ARSITEKTUR 29.0511 27.3476 23.5919 30.1389 8.7533 20.1990 28.9523 122.72
III.1 LANTAI SATU 0.5562 0.7575 0.8729 3.1655 0.2409 1.9126 2.1535 246.72
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.4259 0.6272 0.7910 3.0836 0.2409 1.9126 2.1535 343.38
III.1.2 PEKERJAAN TANGGA 0.1304 0.1304 0.0819 0.0819 - - - -

III.2 FINISHING LUAR GEDUNG 28.4949 26.5901 22.7190 26.9734 8.5124 - 26.7988 117.96
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 11.9513 11.9513 7.7275 10.8918 2.8659 - 12.9728 108.55
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 10.7750 10.7750 8.8044 9.7106 1.4703 - 7.7037 71.50
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 5.7686 3.8637 6.1871 6.3710 4.1762 - 6.1223 158.45

IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.6385 0.6385 0.6385 1.9627 0.1194 - 0.3232 50.61
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.0416 0.0416 0.0416 0.0416 - - - -
IV.1.1 SHAFT PIPA 0.0416 0.0416 0.0416 0.0416 - - - -

IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.1958 0.1958 0.1958 0.1925 0.0357 - 0.0652 33.32
IV.2.1 SHAFT PIPA 0.0515 0.0515 0.0515 0.0136 - - - -
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.0807 0.0807 0.0807 0.0759 0.0357 - 0.0652 80.82
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.0636 0.0636 0.0636 0.0440 - - - -
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.0590 -
IV.3 INSTALASI PEMPIPAAN AIR HUJAN 0.4011 0.4011 0.4011 1.7286 0.0837 - 0.2579 64.31
IV.3.1 PIPA TEGAK 0.0837 0.0837 0.0837 0.2579 0.0837 - 0.2579 308.14
IV.3.2 LANTAI DAK FFL. ±12.000 0.0546 0.0546 0.0546 0.0074 - - - -
IV.3.3 LANTAI DAK FFL. ±8.000 0.0740 0.0740 0.0740 0.0058 - - - -
IV.3.4 LANTAI DUA 0.0740 0.0740 0.0740 - - - - -
IV.3.5 LANTAI SATU 0.1148 0.1148 0.1148 0.0584 - - - -
IV.3.6 LANTAI DAK FFL. ±14.50 0.0451 - - -
IV.4 LAMPU & INST. PENERANGAN &STOP KONTAK 0.9398 - - -
IV.5 PEKERJAAN PENANGKAL PETIR 0.4141 - - -
100.000 100.000 100.000 100.000 74.8395 22.1305 97.1738
Rencana Komulatif Bobot Per Minggu 100.0000
Realisasi Komulatif Bobot Per Minggu 97.1738
Deviasi 2.8262 [ LAMBAT ]

Pekanbaru, 30 Desember 2021


Dibuat Oleh :
Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING

CHOIRUS S, ST., M.Si


Team Leader

Page 15 of 89
LAPORAN MINGGUAN

KEGIATAN : Pembangunan Qur'an Centre


PEKERJAAN : Fisik Pembangunan Qur'an Centre Pelaksana : PT. CIPTA ADHI GUNA
No. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 TANGGAL : 03 Agustus 2021 Konsultan MK : PT. TUJUH JAYA KONSULTAN
No. ADDENDUM I : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 TANGGAL : 09 Agustus 2021 KSO PT. PANCA MANDIRI ENGINEERING
No. ADDENDUM II : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05B TANGGAL : 20 Agustus 2021 Minggu Ke : PK 1 - 50 HK
No. ADDENDUM III : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/X/2021/05C TANGGAL : 28 Oktober 2021 Dari Tgl. : 19 Februari 2022 -
No. ADDENDUM IV : 645.8/PUPRPKPP-CK/ADD.IV-Fsk.QURANCENTRE/XII/2021/05.D TANGGAL : 22 Desember 2021 Sampai Tgl. : 15 Maret 2022
No. ADDENDUM IV : 645.8/PUPRPKPP-CK/ADD.V-Fsk.QURANCENTRE/XII/2021/05.E TANGGAL : 29 Desember 2021
TAHUN ANGGARAN : 2021

LAPORAN KEMAJUAN PEKERJAAN


ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

I PEKERJAAN PERSIAPAN 249,410,765.80 1.893 249,410,765.80 1.893 1.727 0.166 1.893


1 Persiapan Pekerjaan SMK3 Ls 200,450,000.00 1.00 212,870,000.00 1.616 1.00 212,870,000.00 1.616 0.90 1.450 0.10 0.166 1.00 1.616 100.00
2 Pek. Pembersihan Lahan m2 14,630.00 2,497.66 36,540,765.80 0.277 2,497.66 36,540,765.80 0.277 2,497.66 0.277 - - 2,497.66 0.277 100.00

II PEKERJAAN STRUKTUR 8,695,424,894.17 66.005 8,695,424,894.17 66.005 64.240 1.765 66.005


II.1 PEKERJAAN TANAH 169,405,226.58 1.286 169,405,226.58 1.286 1.286 - 1.286
1 Pek. Galian Tanah Pondasi m3 82,220.00 196.86 16,185,983.36 0.123 196.86 16,185,983.36 0.123 196.86 0.1229 - - 196.86 0.123 100.00
Posisi : Galian Pile Cap
2 Pek. Galian Urugan Pasir tbl 10 cm m3 230,890.00 - - .0 - - - -
3 Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - .0 - - - -
4 Pek. Urugan Tanah Kembali m3 32,890.00 49.99 1,644,323.22 0.012 49.99 1,644,323.22 0.012 49.99 0.012 - - 49.99 0.012 100.00
5 Pek. Anti rayap termisida m2 56,000.00 2,447.36 137,052,160.00 1.040 2,447.36 137,052,160.00 1.040 2,447.36 1.040 - - 2,447.36 1.040 100.00
6 Pek. Pengukuran dan pemasangan Bouwplank m1 64,260.00 226.00 14,522,760.00 0.110 226.00 14,522,760.00 0.110 226.00 0.110 - - 226.00 0.110 100.00

II.1A PEKERJAAN LANTAI 269,353,928.41 2.045 269,353,928.41 2.045 1.866 0.178 2.045
2 Pek. Pengurugan dengan Tanah Urug m3 176,710.00 1,524.27 269,353,928.41 2.045 1,524.27 269,353,928.41 2.045 1,391.48 1.866 132.79 0.178 1,524.27 2.045 100.00

II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 3,052,309,959.81 23.169 3,052,309,959.81 23.169 23.169 - 23.169
Data Pondasi
- Pondasi Tiang Pancang Mini Pile 25x25 cm
- Mutu Beton Tiang Pancang K-450
- Kedalaman Pondasi ± 18.5 meter dari MT asli
- Jenis dan Jumlah Pile Cap
Type F1/1 Pile 10 ttk
Type F2/2 Pile 8 ttk
Type F4/4 Pile 24 ttk
Type F6/6 Pile 16 ttk
Type F1K/1 Pile 29 ttk
Type F2K/2 Pile 2 ttk

II.2.1 PEKERJAAN PONDASI DALAM 2,033,055,000.00 15.432 2,033,055,000.00 15.432 15.432 - 15.432
1 Pek. Mobilisasi dan Demobilisasi Alat Pancang 100,000,000.00 2.00 200,000,000.00 1.518 2.00 200,000,000.00 1.518 2.00 1.518 - - 2.00 1.518 100.00
2 Pengadaan Tiang Pancang Mini Pile 25x25 cm 255,000.00 4,950.00 1,262,250,000.00 9.581 4,950.00 1,262,250,000.00 9.581 4,950.00 9.581 - - 4,950.00 9.581 100.00
3 Sambungan Tiang Pancang Mini Pile 25x25 cm 125,000.00 565.00 70,625,000.00 0.536 565.00 70,625,000.00 0.536 565.00 0.536 - - 565.00 0.536 100.00
4 Penurunan dan handling tiang pancang Mini Pile 25x25 cm 15,000.00 4,896.00 73,440,000.00 0.557 4,896.00 73,440,000.00 0.557 4,896.00 0.557 - - 4,896.00 0.557 100.00
5 Pemancangan Tiang Pancang Mini Pile 25x25 cm 65,000.00 4,896.00 318,240,000.00 2.416 4,896.00 318,240,000.00 2.416 4,896.00 2.416 - - 4,896.00 2.416 100.00
6 Pengelasan Sambungan Tiang Pancang Mini Pile 25x25 cm 90,000.00 565.00 50,850,000.00 0.386 565.00 50,850,000.00 0.386 565.00 0.386 - - 565.00 0.386 100.00
7 Pek. Pemotongan Tiang Pancang beikut buang ke luar lokasi proyek 150,000.00 251.00 37,650,000.00 0.286 251.00 37,650,000.00 0.286 251.00 0.286 - - 251.00 0.286 100.00
8 Test PDA 20,000,000.00 1.00 20,000,000.00 0.152 1.00 20,000,000.00 0.152 1.00 0.152 - - 1.00 0.152 100.00

II.2.2 PEKERJAAN BETON PILE CAP 411,280,713.26 3.122 411,280,713.26 3.122 3.122 - 3.122
1 Pile Cap Type F1/1 Pile Bangunan Utama 16,607,015.45 0.126 16,607,015.45 0.126 0.126 - 0.126
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 0.48 111,693.04 0.001 0.48 111,693.04 0.001 0.48 0.001 - - 0.48 0.001 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 0.48 447,937.99 0.003 0.48 447,937.99 0.003 0.48 0.003 - - 0.48 0.003 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 25.50 4,424,760.00 0.034 25.50 4,424,760.00 0.034 25.50 0.034 - - 25.50 0.034 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 171.29 2,283,240.97 0.017 171.29 2,283,240.97 0.017 171.29 0.017 - - 171.29 0.017 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 259.46 3,458,637.20 0.026 259.46 3,458,637.20 0.026 259.46 0.026 - - 259.46 0.026 100.00
f. Pek. Beton K-300 m2 1,229,960.00 4.78 5,880,746.25 0.045 4.78 5,880,746.25 0.045 4.78 0.045 - - 4.78 0.045 100.00

16
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

2 Pile Cap Type F2/2 Pile 31,184,942.45 0.237 31,184,942.45 0.237 0.237 - 0.237
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 1.24 285,934.18 0.002 1.24 285,934.18 0.002 1.24 0.002 - - 1.24 0.002 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 1.24 1,146,721.25 0.009 1.24 1,146,721.25 0.009 1.24 0.009 - - 1.24 0.009 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 36.72 6,371,654.40 0.048 36.72 6,371,654.40 0.048 36.72 0.048 - - 36.72 0.048 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 303.40 4,044,280.84 0.031 303.40 4,044,280.84 0.031 303.40 0.031 - - 303.40 0.031 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 321.20 4,281,641.39 0.033 321.20 4,281,641.39 0.033 321.20 0.033 - - 321.20 0.033 100.00
f. Pek. Beton K-300 m2 1,229,960.00 12.24 15,054,710.40 0.114 12.24 15,054,710.40 0.114 12.24 0.114 - - 12.24 0.114 100.00

3 Pile Cap Type F4/4 Pile 125,882,883.70 0.956 125,882,883.70 0.956 0.956 - 0.956
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 1,072,253.16 0.008 4.64 1,072,253.16 0.008 4.64 0.008 - - 4.64 0.008 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 4,300,204.68 0.033 4.64 4,300,204.68 0.033 4.64 0.033 - - 4.64 0.033 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 122.40 21,238,848.00 0.161 122.40 21,238,848.00 0.161 122.40 0.161 - - 122.40 0.161 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 3,212.03 42,816,413.86 0.325 3,212.03 42,816,413.86 0.325 3,212.03 0.325 - - 3,212.03 0.325 100.00
e. Pek. Beton K-300 m2 1,229,960.00 45.90 56,455,164.00 0.429 45.90 56,455,164.00 0.429 45.90 0.429 - - 45.90 0.429 100.00

4 Pile Cap Type F6/6 Pile 140,260,562.57 1.065 140,260,562.57 1.065 1.065 - 1.065
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 4.64 1,072,253.16 0.008 4.64 1,072,253.16 0.008 4.64 0.008 - - 4.64 0.008 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 4.64 4,300,204.68 0.033 4.64 4,300,204.68 0.033 4.64 0.033 - - 4.64 0.033 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 102.00 17,699,040.00 0.134 102.00 17,699,040.00 0.134 102.00 0.134 - - 102.00 0.134 100.00
d. Pek. Pembesian ɸ 16 kg 13,330.00 1,906.51 25,413,830.55 0.193 1,906.51 25,413,830.55 0.193 1,906.51 0.193 - - 1,906.51 0.193 100.00
e. Pek. Pembesian ɸ 22 kg 13,330.00 2,649.67 35,320,070.17 0.268 2,649.67 35,320,070.17 0.268 2,649.67 0.268 - - 2,649.67 0.268 100.00
f. Pek. Beton K-300 m2 1,229,960.00 45.90 56,455,164.00 0.429 45.90 56,455,164.00 0.429 45.90 0.429 - - 45.90 0.429 100.00

5 Pile Cap Type FK 1 / 1 Pile 90,465,147.28 0.687 90,465,147.28 0.687 0.687 - 0.687
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 3.59 829,209.11 0.006 3.59 829,209.11 0.006 3.59 0.006 - - 3.59 0.006 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 3.59 3,325,491.62 0.025 3.59 3,325,491.62 0.025 3.59 0.025 - - 3.59 0.025 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 118.32 20,530,886.40 0.156 118.32 20,530,886.40 0.156 118.32 0.156 - - 118.32 0.156 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 659.89 8,796,310.82 0.067 659.89 8,796,310.82 0.067 659.89 0.067 - - 659.89 0.067 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 999.59 13,324,589.17 0.101 999.59 13,324,589.17 0.101 999.59 0.101 - - 999.59 0.101 100.00
f. Pek. Beton K-300 m2 1,229,960.00 35.50 43,658,660.16 0.331 35.50 43,658,660.16 0.331 35.50 0.331 - - 35.50 0.331 100.00

6 Pile Cap Type FK 2 / 2 Pile 6,880,161.82 0.052 6,880,161.82 0.052 0.052 - 0.052
a. Pek. Urugan pasir tbl 10 cm m3 230,890.00 0.26 59,569.62 0.000 0.26 59,569.62 0.0005 0.26 0.000 - - 0.26 0.000 100.00
b. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 0.26 238,900.26 0.002 0.26 238,900.26 0.002 0.26 0.002 - - 0.26 0.002 100.00
c. Pek. Bekisting Pondasi m2 173,520.00 8.50 1,474,920.00 0.011 8.50 1,474,920.00 0.011 8.50 0.011 - - 8.50 0.011 100.00
d. Pek. Pembesian ɸ 13 kg 13,330.00 67.51 899,963.59 0.007 67.51 899,963.59 0.007 67.51 0.007 - - 67.51 0.007 100.00
e. Pek. Pembesian ɸ 16 kg 13,330.00 80.30 1,070,410.35 0.008 80.30 1,070,410.35 0.008 80.30 0.008 - - 80.30 0.008 100.00
f. Pek. Beton K-300 m2 1,229,960.00 2.55 3,136,398.00 0.024 2.55 3,136,398.00 0.024 2.55 0.024 - - 2.55 0.024 100.00

II.2.3 PEKERJAAN BETON SLOOF 607,974,246.55 4.615 607,974,246.55 4.615 4.615 - 4.615
1 Pek. Beton Sloof BS 30x60 cm 408,874,572.76 3.104 408,874,572.76 3.104 3.104 - 3.104
a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 4.60 378,031.12 0.003 4.60 378,031.12 0.003 4.60 0.003 - - 4.60 0.003 100.00
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - - -
c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - - -
d. Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 643.98 115,021,267.80 0.873 643.98 115,021,267.80 0.873 643.98 0.873 - - 643.98 0.873 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 10,110.84 134,777,453.69 1.023 10,110.84 134,777,453.69 1.023 10,110.84 1.023 - - 10,110.84 1.023 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 4,774.90 63,649,463.26 0.483 4,774.90 63,649,463.26 0.483 4,774.90 0.483 - - 4,774.90 0.483 100.00
- Pek. Beton K-300 m3 1,229,960.00 77.28 95,048,356.90 0.721 77.28 95,048,356.90 0.721 77.28 0.721 - - 77.28 0.721 100.00

2 Pek. Beton Sloof BS 40x70 cm 162,937,193.63 1.237 162,937,193.63 1.237 1.237 - 1.237
a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 0.57 46,536.52 0.0004 0.57 46,536.52 0.0004 0.57 0.000 - - 0.57 0.000 100.00
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - - -
c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - - -
d. Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 211.82 37,833,170.20 0.287 211.82 37,833,170.20 0.287 211.82 0.287 - - 211.82 0.287 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 4,183.98 55,772,418.34 0.423 4,183.98 55,772,418.34 0.423 4,183.98 0.423 - - 4,183.98 0.423 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 1,436.01 19,142,059.29 0.145 1,436.01 19,142,059.29 0.145 1,436.01 0.145 - - 1,436.01 0.145 100.00
- Pek. Beton K-300 m3 1,229,960.00 40.77 50,143,009.28 0.381 40.77 50,143,009.28 0.381 40.77 0.381 - - 40.77 0.381 100.00

3 Pek. Beton Sloof BS 80x80 cm - - - - - - -


a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 - - - - - - - - -
b. Pek. Urugan Pasir tbl 10 cm m3 230,890.00 - - - - - - - - -

17
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

c. Pek. Lantai Kerja tbl 10 cm m3 925,970.00 - - - - - - - - -


d. Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 - - - - - - - - -
- Pek. Pembesian Ø 16 kg 13,330.00 - - - - - - - - -
- Pek. Pembesian Ø 10 kg 13,330.00 - - - - - - - - -
- Pek. Beton K-300 m3 1,229,960.00 - - - - - - - - -

3a Pek. Beton Sloof BS 60x80 cm 36,162,480.16 0.275 36,162,480.16 0.275 0.275 - 0.275
a. Pek. Galian Tanah (Dibawah Bata Rollag) m3 82,220.00 1.05 86,577.66 0.001 1.05 86,577.66 0.001 1.05 0.001 - - 1.05 0.001 100.00
d Pek. Beton Sloof
- Pek. Bekisting Sloof m2 178,610.00 49.69 8,874,416.46 0.067 49.69 8,874,416.46 0.067 49.69 0.067 - - 49.69 0.067 100.00
- Pek. Pembesian Ø 16 kg 13,330.00 781.80 10,421,353.56 0.079 781.80 10,421,353.56 0.079 781.80 0.079 - - 781.80 0.079 100.00
- Pek. Pembesian Ø 10 kg 13,330.00 184.36 2,457,494.27 0.019 184.36 2,457,494.27 0.019 184.36 0.019 - - 184.36 0.019 100.00
- Pek. Beton K-300 m3 1,229,960.00 11.64 14,322,638.21 0.109 11.64 14,322,638.21 0.109 11.64 0.109 - - 11.64 0.109 100.00

II.3 PEKERJAAN BETON STRUKTUR ATAS 5,204,355,779.37 39.505 5,204,355,779.37 39.505 37.918 1.587 39.505
II.3.1 BETON KOLOM PEDESTAL 385,237,688.60 2.924 385,237,688.60 2.924 2.924 - 2.924
1 Pek. Kolom K 40x40 cm 17,843,249.42 0.135 17,843,249.42 0.135 0.135 - 0.135
a. Pek. Bekisting Kolom m2 184,440.00 15.72 2,899,396.80 0.022 15.72 2,899,396.80 0.022 15.72 0.022 - - 15.72 0.022 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 - - - - - - - - - -
b1. Pek. Pembesian Ø 25 kg 13,330.00 924.75 12,326,917.50 0.094 924.75 12,326,917.50 0.094 924.75 0.094 - - 924.75 0.094 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 41.31 550,602.32 0.004 41.31 550,602.32 0.004 41.31 0.004 - - 41.31 0.004 100.00
d. Pek. Beton K-300 m3 1,229,960.00 1.68 2,066,332.80 0.016 1.68 2,066,332.80 0.016 1.68 0.016 - - 1.68 0.016 100.00

2 Pek. Kolom K 50x80 cm 17,858,630.68 0.136 17,858,630.68 0.136 0.136 - 0.136


a. Pek. Bekisting Kolom m2 184,440.00 10.02 1,848,088.80 0.014 10.02 1,848,088.80 0.014 10.02 0.014 - - 10.02 0.014 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 1,017.23 13,559,609.25 0.103 1,017.23 13,559,609.25 0.103 1,017.23 0.103 - - 1,017.23 0.103 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 28.85 384,599.83 0.003 28.85 384,599.83 0.003 28.85 0.003 - - 28.85 0.003 100.00
d. Pek. Beton K-300 m3 1,229,960.00 1.68 2,066,332.80 0.016 1.68 2,066,332.80 0.016 1.68 0.016 - - 1.68 0.016 100.00

3 Pek. Kolom K 60x60 cm 134,319,241.56 1.020 134,319,241.56 1.020 1.020 - 1.020


a. Pek. Bekisting Kolom m2 184,440.00 91.62 16,898,392.80 0.128 91.62 16,898,392.80 0.128 91.62 0.128 - - 91.62 0.128 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 7,166.81 95,533,610.63 0.725 7,166.81 95,533,610.63 0.725 7,166.81 0.725 - - 7,166.81 0.725 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 351.46 4,685,017.57 0.036 351.46 4,685,017.57 0.036 351.46 0.036 - - 351.46 0.036 100.00
d. Pek. Beton K-300 m3 1,229,960.00 13.99 17,202,220.56 0.131 13.99 17,202,220.56 0.131 13.99 0.131 - - 13.99 0.131 100.00

4 Pek. Kolom K 80x80 cm 215,216,566.96 1.634 215,216,566.96 1.634 1.634 - 1.634


a. Pek. Bekisting Kolom m2 184,440.00 126.42 23,316,904.80 0.177 126.42 23,316,904.80 0.177 126.42 0.177 - - 126.42 0.177 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 11,543.96 153,881,020.13 1.168 11,543.96 153,881,020.13 1.168 11,543.96 1.168 - - 11,543.96 1.168 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 495.90 6,610,383.47 0.050 495.90 6,610,383.47 0.050 495.90 0.050 - - 495.90 0.050 100.00
d. Pek. Beton K-300 m3 1,229,960.00 25.54 31,408,258.56 0.238 25.54 31,408,258.56 0.238 25.54 0.238 - - 25.54 0.238 100.00

5 Pek. Kolom K 120x100 cm - - - - - - -


a. Pek. Bekisting Kolom m2 184,440.00 - - - - - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - - - - -

II.3.2 ELEVASI ± 0.00 1,005,178,494.49 7.630 1,005,178,494.49 7.630 7.406 0.224 7.630
BETON KOLOM (Elv ± 0.00 - Elv ± 4.50) 595,738,065.10 4.522 595,738,065.10 4.522 4.522 - 4.522
1 Pek. Kolom K 50x80 cm 24,505,448.93 0.186 24,505,448.93 0.186 0.186 - 0.186
a. Pek. Bekisting Kolom m2 184,440.00 22.41 4,133,300.40 0.031 22.41 4,133,300.40 0.031 22.41 0.031 - - 22.41 0.031 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 932.46 12,429,641.81 0.094 932.46 12,429,641.81 0.094 932.46 0.094 - - 932.46 0.094 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 263.66 3,514,650.72 0.027 263.66 3,514,650.72 0.027 263.66 0.027 - - 263.66 0.027 100.00
d. Pek. Beton K-300 m3 1,229,960.00 3.60 4,427,856.00 0.034 3.60 4,427,856.00 0.034 3.60 0.034 - - 3.60 0.034 100.00

2 Pek. Kolom K 60x60 cm 184,677,062.99 1.402 184,677,062.99 1.402 1.402 - 1.402


a. Pek. Bekisting Kolom m2 184,440.00 169.45 31,252,435.80 0.237 169.45 31,252,435.80 0.237 169.45 0.237 - - 169.45 0.237 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 6,781.50 90,397,395.00 0.686 6,781.50 90,397,395.00 0.686 6,781.50 0.686 - - 6,781.50 0.686 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 2,336.58 31,146,668.99 0.236 2,336.58 31,146,668.99 0.236 2,336.58 0.236 - - 2,336.58 0.236 100.00
d. Pek. Beton K-300 m3 1,229,960.00 25.92 31,880,563.20 0.242 25.92 31,880,563.20 0.242 25.92 0.242 - - 25.92 0.242 100.00

3 Pek. Kolom K 80x80 cm 386,555,553.18 2.934 386,555,553.18 2.934 2.934 - 2.934

18
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

a. Pek. Bekisting Kolom m2 184,440.00 343.72 63,395,716.80 0.481 343.72 63,395,716.80 0.481 343.72 0.481 - - 343.72 0.481 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 14,241.15 189,834,529.50 1.441 14,241.15 189,834,529.50 1.441 14,241.15 1.441 - - 14,241.15 1.441 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 3,624.19 48,310,471.68 0.367 3,624.19 48,310,471.68 0.367 3,624.19 0.367 - - 3,624.19 0.367 100.00
d. Pek. Beton K-300 m3 1,229,960.00 69.12 85,014,835.20 0.645 69.12 85,014,835.20 0.645 69.12 0.645 - - 69.12 0.645 100.00

BETON PLAT (Elv ± 0.00) 386,294,188.78 2.932 386,294,188.78 2.932 2.708 0.224 2.932
1 Pek. Beton Plat tbl 10 cm 386,294,188.78 2.932 386,294,188.78 2.932 2.708 0.224 2.932
a. Pek. Pembesian Wiremesh M6 (1 Lapis) m2 32,630.00 1,913.06 62,423,229.38 0.474 1,913.06 62,423,229.38 0.474 1,756.84 0.435 156.23 0.039 1,913.06 0.474 100.00
a1 Lantai Kerja Tbl 5cm m3 925,970.00 95.65 88,571,924.16 0.672 95.65 88,571,924.16 0.672 90.03 0.633 5.63 0.040 95.65 0.672 100.00
b. Pek. Beton K-300 m3 1,229,960.00 191.31 235,299,035.25 1.786 191.31 235,299,035.25 1.786 175.68 1.640 15.62 0.146 191.31 1.786 100.00

BETON TANGGA (Elv ± 0.00) 23,146,240.61 0.176 23,146,240.61 0.176 0.176 - 0.176
1 Pek. Beton Tangga 7,949,255.53 0.060 7,949,255.53 0.060 - 0.060 - - - 0.060
a. Pek. Bekisting tangga m2 178,800.00 16.20 2,896,560.00 0.022 16.20 2,896,560.00 0.022 16.20 0.022 - - 16.20 0.022 100.00
b. Pek. Pembesian Ø 10 kg 13,330.00 192.20 2,562,026.53 0.019 192.20 2,562,026.53 0.019 192.20 0.019 - - 192.20 0.019 100.00
c. Pek. Beton K-300 m3 1,229,960.00 2.03 2,490,669.00 0.019 2.03 2,490,669.00 0.019 2.03 0.019 - - 2.03 0.019 100.00

2 Pek. Beton Plat Tangga 15,196,985.08 0.115 15,196,985.08 0.115 0.115 - 0.115
a. Pek. Bekisting tangga m2 178,800.00 32.25 5,765,569.35 0.044 32.25 5,765,569.35 0.044 32.25 0.044 - - 32.25 0.044 100.00
b. Pek. Pembesian Ø 12 kg 13,330.00 121.45 1,618,869.42 0.012 121.45 1,618,869.42 0.012 121.45 0.012 - - 121.45 0.012 100.00
c. Pek. Pembesian Ø 16 kg 13,330.00 287.32 3,829,934.61 0.029 287.32 3,829,934.61 0.029 287.32 0.029 - - 287.32 0.029 100.00
d. Pek. Beton K-300 m3 1,229,960.00 3.24 3,982,611.69 0.030 3.24 3,982,611.69 0.030 3.24 0.030 - - 3.24 0.030 100.00

II.3.3 ELEVASI + 2.00 6,101,315.35 0.046 6,101,315.35 0.046 0.046 - 0.046


BETON BORDES TANGGA (Elv + 2.70) 6,101,315.35 0.046 6,101,315.35 0.046 0.046 - 0.046
1 Pek. Beton Bordes tbl 15 cm 6,101,315.35 0.046 6,101,315.35 0.046 0.046 - 0.046
a. Pek. Bekisting Plat m2 217,440.00 11.00 2,391,840.00 0.018 11.00 2,391,840.00 0.018 11.00 0.018 - - 11.00 0.018 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 155.93 2,078,548.39 0.016 155.93 2,078,548.39 0.016 155.93 0.016 - - 155.93 0.016 100.00
c. Pek. Beton K-300 m3 1,229,960.00 1.33 1,630,926.96 0.012 1.33 1,630,926.96 0.012 1.33 0.012 - - 1.33 0.012 100.00

II.3.5 ELEVASI + 4.50 1,780,218,061.67 13.513 1,780,218,061.67 13.513 12.150 1.363 13.513
BETON BALOK (Elv + 4.50) 1,171,342,109.82 8.891 1,171,342,109.82 8.891 7.528 1.363 8.891
1 Pek. Balok B 30x60 cm 196,911,686.86 1.495 196,911,686.86 1.495 1.495 - 1.495
a. Pek. Bekisting Balok m2 185,810.00 292.63 54,373,580.30 0.413 292.63 54,373,580.30 0.413 292.63 0.413 - - 292.63 0.413 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 4,465.63 59,526,848.97 0.452 4,465.63 59,526,848.97 0.452 4,465.63 0.452 - - 4,465.63 0.452 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 2,374.20 31,648,127.99 0.240 2,374.20 31,648,127.99 0.240 2,374.20 0.240 - - 2,374.20 0.240 100.00
d. Pek. Beton K-300 m3 1,229,960.00 41.76 51,363,129.60 0.390 41.76 51,363,129.60 0.390 41.76 0.390 - - 41.76 0.390 100.00

2 Pek. Balok B 40x80 cm 121,198,600.93 0.920 121,198,600.93 0.920 0.920 - 0.920


a. Pek. Bekisting Balok m2 185,810.00 175.74 32,654,249.40 0.248 175.74 32,654,249.40 0.248 175.74 0.248 - - 175.74 0.248 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 2,169.83 28,923,800.33 0.220 2,169.83 28,923,800.33 0.220 2,169.83 0.220 - - 2,169.83 0.220 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,530.94 20,407,458.46 0.155 1,530.94 20,407,458.46 0.155 1,530.94 0.155 - - 1,530.94 0.155 100.00
d. Pek. Beton K-300 m3 1,229,960.00 31.88 39,213,092.74 0.298 31.88 39,213,092.74 0.298 31.88 0.298 - - 31.88 0.298 100.00

3 Pek. Balok B 120x60 cm - - - - - - -


a. Pek. Bekisting Balok m2 185,810.00 - - - - - - - - -
b. Pek. Pembesian Ø 19 kg 13,330.00 - - - - - - - - -
c. Pek. Pembesian Ø 10 kg 13,330.00 - - - - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - - - - -

3a B 80x80 (Bentang 12 m, grid G ke I) 291,283,450.82 2.211 291,283,450.82 2.211 0.848 1.363 2.211
a. Pek. Bekisting Balok m2 185,810.00 49.50 9,197,595.00 0.070 49.50 9,197,595.00 0.070 49.50 0.070 - - 49.50 0.070 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 1,510.54 20,135,437.91 0.153 1,510.54 20,135,437.91 0.153 1,510.54 0.153 - - 1,510.54 0.153 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 304.25 4,055,693.92 0.031 304.25 4,055,693.92 0.031 304.25 0.031 - - 304.25 0.031 100.00
d. Pek. Beton K-300 m3 1,229,960.00 14.40 17,711,424.00 0.134 14.40 17,711,424.00 0.134 14.40 0.134 - - 14.40 0.134 100.00
3b Fabrikasi dan Pemasangan struktur Balok Entrance IWF.300.150.6,5 kg 35,000.00 - - - - - - - - - -
3c Fabrikasi dan Pemasangan struktur Baja IWF.300.150.5,5.8 Depan kg 35,000.00 3,402.92 119,102,287.50 0.904 3,402.92 119,102,287.50 0.904 865.55 0.230 2,537.37 0.674 3,402.92 0.904 100.00
3d Fabrikasi dan Pemasangan struktur Baja IWF.300.150.5,5.8 Belakang kg 35,000.00 3,459.46 121,081,012.50 0.919 3,459.46 121,081,012.50 0.919 865.55 0.230 2,593.91 0.689 3,459.46 0.919 100.00

4 Pek. Balok B 45x90 cm 52,225,699.29 0.396 52,225,699.29 0.396 0.396 - 0.396


a. Pek. Bekisting Balok m2 185,810.00 44.26 8,223,393.17 0.062 44.26 8,223,393.17 0.062 44.26 0.062 - - 44.26 0.062 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 1,281.93 17,088,066.12 0.130 1,281.93 17,088,066.12 0.130 1,281.93 0.130 - - 1,281.93 0.130 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,166.30 15,546,826.69 0.118 1,166.30 15,546,826.69 0.118 1,166.30 0.118 - - 1,166.30 0.118 100.00

19
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

d. Pek. Beton K-300 m3 1,229,960.00 9.24 11,367,413.32 0.086 9.24 11,367,413.32 0.086 9.24 0.086 - - 9.24 0.086 100.00

5 Pek. Balok B 35x70 cm 358,563,093.54 2.722 358,563,093.54 2.722 2.722 - 2.722


a. Pek. Bekisting Balok m2 185,810.00 438.11 81,405,590.72 0.618 438.11 81,405,590.72 0.618 438.11 0.618 - - 438.11 0.618 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 9,516.79 126,858,773.38 0.963 9,516.79 126,858,773.38 0.963 9,516.79 0.963 - - 9,516.79 0.963 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,758.09 63,425,363.18 0.481 4,758.09 63,425,363.18 0.481 4,758.09 0.481 - - 4,758.09 0.481 100.00
d. Pek. Beton K-300 m3 1,229,960.00 70.63 86,873,366.26 0.659 70.63 86,873,366.26 0.659 70.63 0.659 - - 70.63 0.659 100.00

6 Pek. Balok B 50x100 cm 151,159,578.39 1.147 151,159,578.39 1.147 1.147 - 1.147


a. Pek. Bekisting Balok m2 185,810.00 124.34 23,103,243.78 0.175 124.34 23,103,243.78 0.175 124.34 0.175 - - 124.34 0.175 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 3,364.70 44,851,426.87 0.340 3,364.70 44,851,426.87 0.340 3,364.70 0.340 - - 3,364.70 0.340 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 3,627.92 48,360,140.94 0.367 3,627.92 48,360,140.94 0.367 3,627.92 0.367 - - 3,627.92 0.367 100.00
d. Pek. Beton K-300 m3 1,229,960.00 28.33 34,844,766.80 0.264 28.33 34,844,766.80 0.264 28.33 0.264 - - 28.33 0.264 100.00

BETON KOLOM (Elv + 4.50 - Elv ± 8,50 dan ± 9,50) Grid A-D, Kelas 228,891,048.15 1.737 228,891,048.15 1.737 1.737 - 1.737
1 Pek. Kolom K 50x80 cm 19,767,328.52 0.150 19,767,328.52 0.150 0.150 - 0.150
a. Pek. Bekisting Kolom m2 184,440.00 19.50 3,596,580.00 0.027 19.50 3,596,580.00 0.027 19.50 0.027 - - 19.50 0.027 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 678.15 9,039,739.50 0.069 678.15 9,039,739.50 0.069 678.15 0.069 - - 678.15 0.069 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 239.70 3,195,137.02 0.024 239.70 3,195,137.02 0.024 239.70 0.024 - - 239.70 0.024 100.00
d. Pek. Beton K-300 m3 1,229,960.00 3.20 3,935,872.00 0.030 3.20 3,935,872.00 0.030 3.20 0.030 - - 3.20 0.030 100.00

2 Pek. Kolom K 60x60 cm 78,749,063.00 0.598 78,749,063.00 0.598 0.598 - 0.598


a. Pek. Bekisting Kolom m2 184,440.00 79.38 14,640,847.20 0.111 79.38 14,640,847.20 0.111 79.38 0.111 - - 79.38 0.111 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 2,620.13 34,926,266.25 0.265 2,620.13 34,926,266.25 0.265 2,620.13 0.265 - - 2,620.13 0.265 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,059.81 14,127,239.15 0.107 1,059.81 14,127,239.15 0.107 1,059.81 0.107 - - 1,059.81 0.107 100.00
d. Pek. Beton K-300 m3 1,229,960.00 12.24 15,054,710.40 0.114 12.24 15,054,710.40 0.114 12.24 0.114 - - 12.24 0.114 100.00

3 Pek. Kolom K 80x80 cm 130,374,656.64 0.990 130,374,656.64 0.990 0.990 - 0.990


a. Pek. Bekisting Kolom m2 184,440.00 127.25 23,469,298.35 0.178 127.25 23,469,298.35 0.178 127.25 0.178 - - 127.25 0.178 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 4,315.50 57,525,615.00 0.437 4,315.50 57,525,615.00 0.437 4,315.50 0.437 - - 4,315.50 0.437 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,342.29 17,892,767.29 0.136 1,342.29 17,892,767.29 0.136 1,342.29 0.136 - - 1,342.29 0.136 100.00
e. Pek. Beton K-300 m3 1,229,960.00 25.60 31,486,976.00 0.239 25.60 31,486,976.00 0.239 25.60 0.239 - - 25.60 0.239 100.00

BETON PLAT (Elv + 4.50) 379,984,903.69 2.884 379,984,903.69 2.884 2.884 - 2.884
1 Pek. Beton plat tbl 12 cm 379,984,903.69 2.884 379,984,903.69 2.884 2.884 - 2.884
a. Pek. Bekisting Plat m2 217,440.00 630.33 137,058,422.47 1.040 630.33 137,058,422.47 1.040 630.33 1.040 - - 630.33 1.040 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 11,244.80 149,893,160.41 1.138 11,244.80 149,893,160.41 1.138 11,244.80 1.138 - - 11,244.80 1.138 100.00
c. Pek. Beton K-300 m3 1,229,960.00 75.64 93,033,320.81 0.706 75.64 93,033,320.81 0.706 75.64 0.706 - - 75.64 0.706 100.00

II.3.6 ELEVASI + 8.00 - - - -


BETON KOLOM (Elv ± 8.00) - - - -
1 Pek. Kolom K 50x80 cm - - - -
a. Pek. Bekisting Kolom m2 184,440.00 - - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - - -
c. Pek. Pembesian Ø 10 kg 13,330.00 - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - -

2 Pek. Kolom K 60x60 cm - - - -


a. Pek. Bekisting Kolom m2 184,440.00 - - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - -

3 Pek. Kolom K 80x80 cm - - - -


a. Pek. Bekisting Kolom m2 184,440.00 - - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - - -
e. Pek. Beton K-300 m3 1,229,960.00 - - - - - -

II.3.7 ELEVASI + 8.50 511,000,194.46 3.879 511,000,194.46 3.879 3.879 - 3.879


BETON BALOK (Elv + 8.50) 370,760,486.63 2.814 370,760,486.63 2.814 2.814 - 2.814
1 Pek. Balok B 35x70 cm 271,679,922.57 2.062 271,679,922.57 2.062 2.062 - 2.062
a. Pek. Bekisting Balok m2 185,810.00 318.06 59,097,985.36 0.449 318.06 59,097,985.36 0.449 318.06 0.449 - - 318.06 0.449 100.00

20
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

b. Pek. Pembesian Ø 16 kg 13,330.00 6,861.75 91,467,069.02 0.694 6,861.75 91,467,069.02 0.694 6,861.75 0.694 - - 6,861.75 0.694 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,510.85 60,129,638.52 0.456 4,510.85 60,129,638.52 0.456 4,510.85 0.456 - - 4,510.85 0.456 100.00
d. Pek. Beton K-300 m3 1,229,960.00 49.58 60,985,229.68 0.463 49.58 60,985,229.68 0.463 49.58 0.463 - - 49.58 0.463 100.00

2 Pek. Balok B 45x90 cm 99,080,564.05 0.752 99,080,564.05 0.752 0.752 - 0.752


a. Pek. Bekisting Balok m2 185,810.00 96.53 17,935,310.25 0.136 96.53 17,935,310.25 0.136 96.53 0.136 - - 96.53 0.136 100.00
b. Pek. Pembesian Ø 19 kg 13,330.00 2,833.06 37,764,626.11 0.287 2,833.06 37,764,626.11 0.287 2,833.06 0.287 - - 2,833.06 0.287 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,338.28 17,839,278.33 0.135 1,338.28 17,839,278.33 0.135 1,338.28 0.135 - - 1,338.28 0.135 100.00
d. Pek. Beton K-300 m3 1,229,960.00 20.77 25,541,349.36 0.194 20.77 25,541,349.36 0.194 20.77 0.194 - - 20.77 0.194 100.00

BETON PLAT (Elv + 8.50) 140,239,707.83 1.065 140,239,707.83 1.065 1.065 - 1.065
1 Pek. Beton Plat tbl 10 cm 140,239,707.83 1.065 140,239,707.83 1.065 1.065 - 1.065
a. Pek. Bekisting plat m2 217,440.00 244.89 53,248,881.60 0.404 244.89 53,248,881.60 0.404 244.89 0.404 - - 244.89 0.404 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 4,266.34 56,870,335.79 0.432 4,266.34 56,870,335.79 0.432 4,266.34 0.432 - - 4,266.34 0.432 100.00
c. Pek. Beton K-300 m3 1,229,960.00 24.49 30,120,490.44 0.229 24.49 30,120,490.44 0.229 24.49 0.229 - - 24.49 0.229 100.00

II.3.8 ELEVASI + 11.00 422,164,991.54 3.205 422,164,991.54 3.205 3.205 - 3.205


BETON KOLOM (Elv ± 0.00 - Elv + 11.00) Grid L-M, Café 267,523,575.90 2.031 267,523,575.90 2.031 2.031 - 2.031
1 Pek. Kolom K 60x60 cm - - - -
a. Pek. Bekisting Kolom m2 184,440.00 - - - - - -
b. Pek. Pembesian Ø 25 kg 13,330.00 - - - - - -
c. Pek. Pembesian Ø 12 kg 13,330.00 - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - -

1a Pek. Kolom K 50x80 cm 51,694,513.96 0.3924 51,694,513.96 0.3924 0.392 - 0.392


a. Pek. Bekisting Kolom m2 184,440.00 56.56 10,431,926.40 0.0792 56.56 10,431,926.40 0.0792 56.56 0.079 - - 56.56 0.079 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 1,864.91 24,859,283.63 0.1887 1,864.91 24,859,283.63 0.1887 1,864.91 0.189 - - 1,864.91 0.189 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 418.58 5,579,655.94 0.0424 418.58 5,579,655.94 0.0424 418.58 0.042 - - 418.58 0.042 100.00
d. Pek. Beton K-300 m3 1,229,960.00 8.80 10,823,648.00 0.0822 8.80 10,823,648.00 0.0822 8.80 0.082 - - 8.80 0.082 100.00

2 Pek. Kolom K 80x80 cm 215,829,061.94 1.638 215,829,061.94 1.638 1.638 - 1.638


a. Pek. Bekisting Kolom m2 184,440.00 208.96 38,540,582.40 0.293 208.96 38,540,582.40 0.293 208.96 0.293 - - 208.96 0.293 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 7,120.58 94,917,264.75 0.720 7,120.58 94,917,264.75 0.720 7,120.58 0.720 - - 7,120.58 0.720 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 2,281.90 30,417,704.39 0.231 2,281.90 30,417,704.39 0.231 2,281.90 0.231 - - 2,281.90 0.231 100.00
e. Pek. Beton K-300 m3 1,229,960.00 42.24 51,953,510.40 0.394 42.24 51,953,510.40 0.394 42.24 0.394 - - 42.24 0.394 100.00

BETON BALOK (Elv + 11.00) 102,986,567.88 0.782 102,986,567.88 0.782 0.782 - 0.782
1 Pek. Balok B 30x60 cm - - - -
a. Pek. Bekisting Balok m2 185,810.00 - - - - - -
b. Pek. Pembesian Ø 16 kg 13,330.00 - - - - - -
c. Pek. Pembesian Ø 10 kg 13,330.00 - - - - - -
d. Pek. Beton K-300 m3 1,229,960.00 - - - - - -

2 Pek. Balok B 40x80 cm 102,986,567.88 0.782 102,986,567.88 0.782 0.782 - 0.782


a. Pek. Bekisting Balok m2 185,810.00 133.40 24,787,054.00 0.188 133.40 24,787,054.00 0.188 133.40 0.188 - - 133.40 0.188 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 2,413.57 32,172,899.66 0.244 2,413.57 32,172,899.66 0.244 2,413.57 0.244 - - 2,413.57 0.244 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,483.45 19,774,347.98 0.150 1,483.45 19,774,347.98 0.150 1,483.45 0.150 - - 1,483.45 0.150 100.00
d. Pek. Beton K-300 m3 1,229,960.00 21.34 26,252,266.24 0.199 21.34 26,252,266.24 0.199 21.34 0.199 - - 21.34 0.199 100.00

BETON PLAT (Elv + 11.00) 51,654,847.75 0.392 51,654,847.75 0.392 0.392 - 0.392
1 Pek. Beton Plat tbl 10 cm 51,654,847.75 0.392 51,654,847.75 0.392 0.392 - 0.392
a. Pek. Bekisting plat m2 217,440.00 61.34 13,338,639.36 0.101 61.34 13,338,639.36 0.101 61.34 0.101 - - 61.34 0.101 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 2,308.41 30,771,141.77 0.234 2,308.41 30,771,141.77 0.234 2,308.41 0.234 - - 2,308.41 0.234 100.00
c. Pek. Beton K-300 m3 1,229,960.00 6.13 7,545,066.62 0.057 6.13 7,545,066.62 0.057 6.13 0.057 - - 6.13 0.057 100.00

II.3.9 ELEVASI + 11.50 1,094,455,033.27 8.308 1,094,455,033.27 8.308 8.308 - 8.308


BETON KOLOM (Elv ± 4.50 - Elv ± 11.50 dan ± 12.50) Grid E-K, Aula 535,610,132.50 4.066 535,610,132.50 4.066 4.066 - 4.066
1 Pek. Kolom K 60x60 cm 130,016,849.95 0.987 130,016,849.95 0.987 0.987 - 0.987
a. Pek. Bekisting Kolom m2 184,440.00 130.74 24,112,763.40 0.183 130.74 24,112,763.40 0.183 130.74 0.183 - - 130.74 0.183 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 4,315.50 57,525,615.00 0.437 4,315.50 57,525,615.00 0.437 4,315.50 0.437 - - 4,315.50 0.437 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 1,769.13 23,582,477.95 0.179 1,769.13 23,582,477.95 0.179 1,769.13 0.179 - - 1,769.13 0.179 100.00
d. Pek. Beton K-300 m3 1,229,960.00 20.16 24,795,993.60 0.188 20.16 24,795,993.60 0.188 20.16 0.188 - - 20.16 0.188 100.00

21
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

2 Pek. Kolom K 80x80 cm 405,593,282.55 3.079 405,593,282.55 3.079 3.079 - 3.079


a. Pek. Bekisting Kolom m2 184,440.00 395.76 72,993,820.70 0.554 395.76 72,993,820.70 0.554 395.76 0.554 - - 395.76 0.554 100.00
b. Pek. Pembesian Ø 25 kg 13,330.00 13,378.05 178,329,406.50 1.354 13,378.05 178,329,406.50 1.354 13,378.05 1.354 - - 13,378.05 1.354 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 4,250.59 56,660,429.75 0.430 4,250.59 56,660,429.75 0.430 4,250.59 0.430 - - 4,250.59 0.430 100.00
d. Pek. Beton K-300 m3 1,229,960.00 79.36 97,609,625.60 0.741 79.36 97,609,625.60 0.741 79.36 0.741 - - 79.36 0.741 100.00

BETON BALOK (Elv + 11.50) 387,471,975.03 2.941 387,471,975.03 2.941 2.941 - 2.941
1 Pek. Balok B 35x70 cm 300,191,172.95 2.279 300,191,172.95 2.279 2.279 - 2.279
a. Pek. Bekisting Balok m2 185,810.00 310.21 57,639,191.05 0.438 310.21 57,639,191.05 0.438 310.21 0.438 - - 310.21 0.438 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 6,452.67 86,014,035.18 0.653 6,452.67 86,014,035.18 0.653 6,452.67 0.653 - - 6,452.67 0.653 100.00
c. Pek. Pembesian Ø 12 kg 13,330.00 3,442.70 45,891,161.27 0.348 3,442.70 45,891,161.27 0.348 3,442.70 0.348 - - 3,442.70 0.348 100.00
d. Pek. Beton K-300 m3 1,229,960.00 43.43 53,415,563.85 0.405 43.43 53,415,563.85 0.405 43.43 0.405 - - 43.43 0.405 100.00
1a Fabrikasi dan Pemasangan Struktur Baja IWF 350.175.6,9 kg 35,000.00 1,635.18 57,231,221.60 0.434 1,635.18 57,231,221.60 0.434 1,635.18 0.434 - - 1,635.18 0.434 100.00

2 Pek. Balok B 30x50 cm 87,280,802.08 0.663 87,280,802.08 0.663 0.663 - 0.663


a. Pek. Bekisting Balok m2 185,810.00 151.42 28,136,093.44 0.214 151.42 28,136,093.44 0.214 151.42 0.214 - - 151.42 0.214 100.00
b. Pek. Pembesian Ø 16 kg 13,330.00 1,731.52 23,081,143.86 0.175 1,731.52 23,081,143.86 0.175 1,731.52 0.175 - - 1,731.52 0.175 100.00
c. Pek. Pembesian Ø 10 kg 13,330.00 1,093.30 14,573,703.66 0.111 1,093.30 14,573,703.66 0.111 1,093.30 0.111 - - 1,093.30 0.111 100.00
d. Pek. Beton K-300 m3 1,229,960.00 17.47 21,489,861.12 0.163 17.47 21,489,861.12 0.163 17.47 0.163 - - 17.47 0.163 100.00

BETON PLAT (Elv + 11.50) 171,372,925.74 1.301 171,372,925.74 1.301 1.301 - 1.301
1 Pek. Beton Plat tbl 10 cm 171,372,925.74 1.301 171,372,925.74 1.301 1.301 - 1.301
a. Pek. Bekisting plat m2 217,440.00 302.82 65,844,202.32 0.500 302.82 65,844,202.32 0.500 302.82 0.500 - - 302.82 0.500 100.00
b. Pek. Pembesian Ø 8 kg 13,330.00 5,122.55 68,283,628.18 0.518 5,122.55 68,283,628.18 0.518 5,122.55 0.518 - - 5,122.55 0.518 100.00
c. Pek. Beton K-300 m3 1,229,960.00 30.28 37,245,095.24 0.283 30.28 37,245,095.24 0.283 30.28 0.283 - - 30.28 0.283 100.00

III PEKERJAAN ARSITEKTUR 3,970,460,706.10 30.139 3,970,460,706.87 30.139 14.181 14.771 28.952
III.1 LANTAI SATU 417,023,516.32 3.166 320,796,416.41 2.435 1.298 0.855 2.154
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 406,233,930.07 3.084 310,006,830.16 2.353 1.298 0.855 2.154
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I Posisi : Dibawah
1.a m2 350,651.00 80.86 28,352,237.26 0.215 80.86 28,352,237.26 0.215 64.68 0.172 16.17 0.043 80.86 0.215 100.00
Curtain Wall
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I Posisi : Area Café dan
1.b m2 350,651.00 317.53 111,340,497.19 0.845 317.53 111,340,497.19 0.845 242.51 0.645 - - 242.51 0.645 76.37
Teras Belakang
Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Unpolish Type I Posisi : Area Carport
1.c m2 350,651.00 360.00 126,234,360.00 0.958 360.00 126,234,360.00 0.958 90.00 0.240 270.00 0.719 360.00 0.958 100.00
Depan
2 Pek. Urugan Pasir tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 230,890.00 3.11 717,698.48 0.005 3.11 717,698.48 0.005 3.11 0.005 - - 3.11 0.005 100.00
3 Pek. Lantai kerja tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 925,970.00 3.11 2,878,285.15 0.022 3.11 2,878,285.15 0.022 3.11 0.022 - - 3.11 0.022 100.00
4 Pek. Pasangan Rollag 1 Bata m2 229,460.00 102.48 23,515,060.80 0.178 102.48 23,515,060.80 0.178 102.48 0.178 - - 102.48 0.178 100.00
5 Pek. Plesteran 1:4 m2 45,160.00 102.48 4,627,996.80 0.035 102.48 4,627,996.80 0.035 102.48 0.035 - - 102.48 0.035 100.00
6 Ramp Depan
a Pek. Tanah Timbun m3 176,710.00 55.97 9,890,105.28 0.075 - - - - - - - - - -
a1 Pek. Tanah Timbun m3 32,890.00 - - - 31.85 1,047,546.50 0.008 - - 31.85 0.008 31.85 0.008 100.00
b Pek. Wiremesh M6 kg 32,630.00 136.08 4,440,290.40 0.034 - - - - - - - - - -
b1. Pek. Wiremesh M6 kg 32,630.00 - - - 63.70 2,078,531.00 0.016 - - 63.70 0.016 63.70 0.016 100.00
c Pek. Beton K300 m3 1,229,960.00 68.04 83,686,478.40 0.635 7.49 9,214,616.99 0.070 - - 7.49 0.070 7.49 0.070 100.00
d Pek. Pas 1/2 Bata untuk Cansteen m2 117,100.00 14.45 1,691,860.80 0.013 - - - - - - - - - -
e Pek. Plesteran 1:4 m2 45,160.00 14.45 652,471.68 0.005 - - - - - - - - - -
f Pek. Besi Siku 40.40.4 kg 13,330.00 615.65 8,206,587.84 0.062 - - - - - - - - - -

III.1.2 PEKERJAAN TANGGA 10,789,586.25 0.082 10,789,586.25 0.082 - - -


1 Tangga Naik ke teras
a Pek. Galian Tanah m3 82,220.00 3.50 288,161.16 0.002 3.50 288,161.16 0.002 - - - - - - -
b Pek. Urugan Pasir tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 230,890.00 1.17 269,737.82 0.002 1.17 269,737.82 0.002 - - - - - - -
c Pek. Lantai kerja tbl 5 cm Posisi : Dibawah pasangan bata 1 batu m3 925,970.00 1.17 1,081,766.77 0.008 1.17 1,081,766.77 0.008 - - - - - - -
d Pasangan Bata 1 batu camp 1:2 m2 229,460.00 38.94 8,935,573.96 0.068 38.94 8,935,573.96 0.068 - - - - - - -
e Pek. Timbunan m3 32,890.00 4.33 142,424.31 0.001 4.33 142,424.31 0.001 - - - - - - -
f Pek. Urugan Pasir tbl 5 cm Posisi : Dibawah Plat Lantai Tangga m3 230,890.00 0.31 71,922.24 0.001 0.31 71,922.24 0.001 - - - - - - -

III.2 FINISHING LUAR GEDUNG 3,553,437,189.79 26.973 3,649,664,290.46 27.704 12.883 13.916 26.799
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 1,434,871,225.63 10.892 1,821,336,968.75 13.825 3.750 9.223 12.973
1 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium
skin 0.3 mm tkdn 61%
a Posisi : Tampak Luar Bangunan pada kolom dan balok silang m2 595,180.00 1,662.41 989,430,207.90 7.511 1,906.86 1,134,925,264.91 8.615 384.30 1.736 1,522.57 6.879 1,906.86 8.615 100.00
b Posisi : leher atap dan background logo m2 595,180.00 407.20 242,357,296.00 1.840 854.38 508,507,507.68 3.860 285.91 1.292 463.02 2.092 748.93 3.384 87.66

22
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

c Posisi : Keliling sisi samping atap m2 595,180.00 25.25 15,027,104.64 0.114 69.30 41,245,974.00 0.313 - - - - - - -
d Posisi : Plafond Atap m2 595,180.00 - - - - - - - - - - - - -
2 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm m2 595,180.00 226.00 134,510,680.00 1.021 139.64 83,112,285.07 0.631 69.82 0.315 55.86 0.252 125.68 0.568 90.00
3 Pek. Pemasangan 1/2 Bata
a Posisi : Elev + 8.50 m2 117,100.00 46.51 5,446,344.42 0.041 46.51 5,446,344.42 0.041 46.51 0.041 - - 46.51 0.041 100.00
b Posisi : Elev + 11.50 m2 117,100.00 63.84 7,475,734.26 0.057 63.84 7,475,734.26 0.057 63.84 0.057 - - 63.84 0.057 100.00
c Posisi : Elev + 11.50 Bentang 18 m ( I.3-I7A dan G3- G7A) m2 117,100.00 77.11 9,029,815.20 0.069 77.11 9,029,815.20 0.069 77.11 0.069 - - 77.11 0.069 100.00
4 Pek. Plesteran m1 45,160.00 187.46 8,465,820.05 0.064 187.46 8,465,820.05 0.064 187.46 0.064 - - 187.46 0.064 100.00
5 Pek. Balok Latei Penahan Bata
a Pek. Bekisting Balok m2 185,810.00 23.49 4,363,896.50 0.033 23.49 4,363,896.50 0.033 23.49 0.033 - - 23.49 0.033 100.00
b Pek. Pembesian Ø 8 kg 13,330.00 142.56 1,900,357.05 0.014 142.56 1,900,357.05 0.014 142.56 0.014 - - 142.56 0.014 100.00
c Pek. Pembesian Ø 6 kg 13,330.00 955.24 12,733,342.87 0.097 955.24 12,733,342.87 0.097 955.24 0.097 - - 955.24 0.097 100.00
d Pek. Beton K =175 m3 925,970.00 1.54 1,425,927.13 0.011 1.54 1,425,927.13 0.011 1.54 0.011 - - 1.54 0.011 100.00
6 Pek. Kolom Praktis Penahan Bata
a Pek. Bekisting Balok m2 184,440.00 3.12 575,452.80 0.004 3.12 575,452.80 0.004 3.12 0.004 - - 3.12 0.004 100.00
b Pek. Pembesian Ø 8 kg 13,330.00 18.94 252,476.31 0.002 18.94 252,476.31 0.002 18.94 0.002 - - 18.94 0.002 100.00
c Pek. Pembesian Ø 6 kg 13,330.00 126.90 1,691,576.54 0.013 126.90 1,691,576.54 0.013 126.90 0.013 - - 126.90 0.013 100.00
d Pek. Beton K =175 m3 925,970.00 0.20 185,193.96 0.001 0.20 185,193.96 0.001 0.20 0.001 - - 0.20 0.001 100.00

III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 1,279,262,448.96 9.711 1,021,790,223.72 7.756 3.918 3.786 7.704
Lengkap dengan Accessories dan berfungsi dengan baik

1 Pek. Pengadaan dan Pemasangan Pintu Kaca 2 Daun (Frame less) Posisi : Lantai unit 5,540,700.00 2.00 11,081,400.00 0.084 2.00 11,081,400.00 0.084 1.00 0.042 - - 1.00 0.042 50.00

2 Pek. Pengadaan dan Pemasangan Pintu Kaca 1 Daun Posisi : Lantai 1 (Pintu Masuk) unit 2,750,340.00 1.00 2,750,340.00 0.021 1.00 2,750,340.00 0.021 0.50 0.010 - - 0.50 0.010 50.00

3 Pek. Curtain Wall type 1 - T = 11.50 m Posisi : area hall dll m2 804,122.00 1,064.10 855,666,220.20 6.495 850.62 683,998,235.03 5.192 413.55 2.524 437.07 2.668 850.62 5.192 100.00
4 Pek. Curtain Wall type 2 - T = 8.50 m Posisi : area kelas dll m2 804,122.00 509.58 409,764,488.76 3.110 402.87 323,960,248.69 2.459 219.76 1.341 183.12 1.118 402.87 2.459 100.00

III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 839,303,515.20 6.371 806,537,098.00 6.122 5.215 0.908 6.122
Posisi : area atap area tengah
1 Pabrikasi dan pemasangan struktur Kolom rangka baja dan atap WF termasuk z kg 35,000.00 18,157.45 635,510,904.00 4.824 18,157.45 635,510,904.00 4.824 15,718.92 4.176 2,438.53 0.648 18,157.45 4.824 100.00
2 Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 l m2 207,144.00 722.30 149,620,111.20 1.136 - - - - - - - - - -
2a Pek. Penutup Atap AT Galvanium tebal 0,45 mm Griblock 75 cm Lengkap (Item baru) m2 161,780.00 - - - 722.30 116,853,694.00 0.887 577.84 0.710 144.46 0.18 722.30 0.887 100.00
3 Pek. Aluminium foil insulasi atap [thermal foam 5 mm] m2 75,000.00 722.30 54,172,500.00 0.411 722.30 54,172,500.00 0.411 577.84 0.329 144.46 0.08 722.30 0.411 100.00

IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 258,560,814.05 1.963 258,560,814.05 1.963 0.284 1.150 1.433
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 5,484,600.00 0.042 5,484,600.00 0.042 - 0.042 0.042
IV.1.1 SHAFT PIPA 5,484,600.00 0.042 5,484,600.00 0.042 - 0.042 0.042
1 Pipa PPR PN-10 Dia. 2 Inci pada shaft Gedung Utama m' 365,640.00 15.00 5,484,600.00 0.042 15.00 5,484,600.00 0.042 - - 15.00 0.042 15.00 0.042 100.00

IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 25,358,577.75 0.192 25,358,577.75 0.192 0.076 0.102 0.178
IV.2.1 SHAFT PIPA 1,796,008.50 0.014 1,796,008.50 0.014 - 0.014 0.014
1 PVC AW Dia.4 Inci Shaft Gedung Utama M' 128,227.00 9.00 1,154,043.00 0.009 9.00 1,154,043.00 0.009 - - 9.00 0.009 9.00 0.009 100.00
2 PVC AW Dia.3 Inci Shaft Gedung Utama M' 71,329.50 9.00 641,965.50 0.005 9.00 641,965.50 0.005 - - 9.00 0.005 9.00 0.005 100.00
3 PVC D Dia.3 Inci Shaft Gedung Utama M' 59,655.20 - - - - - - - - - - - - -

IV.2.2 LANTAI SATU GEDUNG UTAMA 9,994,701.75 0.076 9,994,701.75 0.076 0.036 0.030 0.065
1 PVC AW Dia.4 Inci M' 128,227.00 42.00 5,385,534.00 0.041 42.00 5,385,534.00 0.041 30.00 0.029 12.00 0.012 42.00 0.041 100.00
2 PVC AW Dia.3 Inci M' 71,329.50 45.00 3,209,827.50 0.024 45.00 3,209,827.50 0.024 12.00 0.006 33.00 0.018 45.00 0.024 100.00
3 PVC AW Dia.2 Inci M' 41,085.00 25.00 1,027,125.00 0.008 25.00 1,027,125.00 0.008 - - - - - - -
4 PVC D Dia.2 Inci M' 35,359.50 - - - - - - - - - - - - -
5 PVC D Dia.1,5 Inci M' 27,571.50 13.50 372,215.25 0.003 13.50 372,215.25 0.003 - - - - - - -
6 PVC D Dia.1,25 Inci M' 22,951.50 - - - - - - - - - - - - -

IV.2.3 LANTAI DUA GEDUNG UTAMA 5,795,328.00 0.044 5,795,328.00 0.044 0.040 - 0.040
1 PVC AW Dia.4 Inci M' 128,227.00 30.00 3,846,810.00 0.029 30.00 3,846,810.00 0.029 30.00 0.029 - - 30.00 0.029 100.00
2 PVC AW Dia.3 Inci M' 71,329.50 20.00 1,426,590.00 0.011 20.00 1,426,590.00 0.011 20.00 0.011 - - 20.00 0.011 100.00
3 PVC AW Dia.2 Inci M' 41,085.00 6.00 246,510.00 0.002 6.00 246,510.00 0.002 - - - - - - -
4 PVC D Dia.2 Inci M' 35,359.50 - - - - - - - - - - - - -
5 PVC D Dia.1,25 Inci M' 22,951.50 12.00 275,418.00 0.002 12.00 275,418.00 0.002 - - - - - - -
6 VENT CAP Dia.3 Inci Bh 175,000.00 - - - - - - - - - - - - -

IV.2.4 LANTAI TIGA GEDUNG UTAMA 7,772,539.50 0.059 7,772,539.50 0.059 - 0.059 0.059
1 Panel Penerangan (PP Lt.3) (Item Baru) Bh 7,772,539.50 1.00 7,772,539.50 0.059 1.00 7,772,539.50 0.059 - - 1.000 0.059 1.00 0.059 100.00

23
LAPORAN KEMAJUAN PEKERJAAN
ADDENDUM IV MC 100
HARGA SATUAN S/D MINGGU LALU MINGGU INI S/D MINGGU INI PRESTASI
NO URAIAN PEKERJAAN SAT
(Rp) (%)
BOBOT BOBOT
VOL JUMLAH HARGA VOL JUMLAH HARGA VOL BOBOT (%) VOL BOBOT (%) VOL BOBOT (%)
(%) (%)
1 2 3 4 5 6.00 6 7 8 9 10 11 12 13 14 15 16

IV.3 INSTALASI PEMIPAAN AIR HUJAN 49,359,309.00 0.375 49,359,309.00 0.375 0.084 0.260 0.344
IV.3.1 PIPA TEGAK 33,980,155.00 0.258 33,980,155.00 0.258 0.084 0.174 0.258
1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 265.00 33,980,155.00 0.258 265.00 33,980,155.00 0.258 86.00 0.084 179.00 0.174 265.00 0.258 100.00

IV.3.2 LANTAI DAK FFL. ±12.00 972,908.00 0.007 972,908.00 0.007 - 0.007 0.007
1 Roof Drain 4'' BH 115,000.00 4.00 460,000.00 0.003 4.00 460,000.00 0.003 - - 4.00 0.003 4.00 0.003 100.00
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 4.00 512,908.00 0.004 4.00 512,908.00 0.004 - - 4.00 0.004 4.00 0.004 100.00

IV.3.3 LANTAI DAK FFL. ±8.00 769,362.00 0.006 769,362.00 0.006 - 0.006 0.006
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 6.00 769,362.00 0.006 6.00 769,362.00 0.006 - - 6.00 0.006 6.00 0.006 100.00

IV.3.4 LANTAI DUA - - - - - - -


1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 - - - - - - - - - - - - -

IV.3.5 LANTAI SATU 7,693,620.00 0.058 7,693,620.00 0.058 - 0.058 0.058


1 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 60.00 7,693,620.00 0.058 60.00 7,693,620.00 0.058 - - 60.00 0.058 60.00 0.058 100.00
2 Pipa PVC Dia.12 Inci Class AW M' 371,563.50 - - - - - - - - - - - - -

IV.3.6 LANTAI DAK FFL. ±14.50 5,943,264.00 0.045 5,943,264.00 0.045 - 0.014 0.014
1 Roof Drain 4'' (Item Baru) BH 115,000.00 16.00 1,840,000.00 0.014 16.00 1,840,000.00 0.014 - - 16.00 0.014 16.00 0.014 100.00
2 Pipa PVC Dia.4 Inci Class AW M' 128,227.00 32.00 4,103,264.00 0.031 32.00 4,103,264.00 0.031 - - - - - - -

IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK 123,801,466.80 0.940 123,801,466.80 0.940 - 0.456 0.456
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 31,057,873.50 0.236 31,057,873.50 0.236 - 0.065 0.065
1 FREZA ARTNRL-225 18 Watt 3000K (Item Baru) buah 750,000.00 30.00 22,500,000.00 0.171 30.00 22,500,000.00 0.171 - - - - - - -
2 (Item Baru) titik 285,262.45 30.00 8,557,873.50 0.065 30.00 8,557,873.50 0.065
Instalasi titik lampu NYM 3x2,5 mm2 + PVC high impact conduit Ø 20 mm - - 30.00 0.065 30.00 0.065 100.00

IV.4.2 FASADE 92,743,593.30 0.704 92,743,593.30 0.704 - 0.391 0.391


1 LED STRIP VF 1000 72W (STRIPLIGHT ALD LED 72W 3000K) (Item Baru) M' 1,733,916.25 45.00 78,026,231.25 0.592 45.00 78,026,231.25 0.592 - - 25.000 0.33 25.00 0.329 55.56
2 DRIVER 0T Z90 (POWER SUPPLY LED TAPE ALD 72W) (Item Baru) buah 1,350,000.00 9.00 12,150,000.00 0.092 9.00 12,150,000.00 0.092 - - 5.000 0.05 5.00 0.051 55.56
3 Instalasi titik lampu NYM 3x2,5 mm2 + PVC high impact conduit Ø 20 mm (Item Baru) titik 285,262.45 9.00 2,567,362.05 0.019 9.00 2,567,362.05 0.019 - - 5.000 0.01 5.00 0.011 55.56

IV.5 PEKERJAAN PENANGKAL PETIR 54,556,860.50 0.414 54,556,860.50 0.414 0.124 0.290 0.414
IV.5.1 GEDUNG UTAMA (Pengadaan dan pemasangan peralatan penangkal petir) 54,556,860.50 0.414 54,556,860.50 0.414 0.124 0.290 0.414
1 Tipe elektrostatik Radius 85 M (Item Baru) set 37,056,860.50 1.00 37,056,860.50 0.281 1.00 37,056,860.50 0.281 0.30 0.084 0.70 0.197 1.00 0.281 100.00
2 Grounding termasuk Cooper Max 2 ohm, Cooper Rood dan bak kontrol (Item Baru) set 17,500,000.00 1.00 17,500,000.00 0.133 1.00 17,500,000.00 0.133 0.30 0.040 0.70 0.093 1.00 0.133 100.00

JUMLAH 13,173,857,180.12 100.000 13,173,857,180.89 100.000 - 80.431 - 17.853 - 98.284 -


PPN 10% 1,317,385,718.01 1,317,385,718.09
TOTAL 14,491,242,898.13 14,491,242,898.98
PEMBULATAN 14,491,242,898.00 14,491,242,898.00

Pekanbaru, 15 Maret 2022

Diketahui Oleh : Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :


DINAS PU-CIPTA KARYA DINAS PU-CIPTA KARYA Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. TUJUH JAYA KONSULTAN, KSO
Pejabat Pembuat Komitmen (PPK) Pejabat Pelaksana Teknis Kegiatan (PPTK) PT. CIPTA ADHI GUNA
PT. PANCA MANDIRI ENGINEERING

THOMAS LARFO DIMEIRA, S.T DEKO FAHRUZI, ST CHOIRUS SUBECHAN, S.T., M.Si. Ir. MULYADI TANJUNG, M.T.
NIP. 19790529 200604 1 006 NIP. 19870405 201102 1 002 Team Leader Project Manager

CHOIRUS SUBECHAN, ST., M.Si.


Team Leader

24
SKETSA PEKERJAAN (ACP)

ANALISA PERHITUNGAN

NO URAIAN PEKERJAAN

Pek. Pengadaan dan Pemasangan Aluminium Composite Panel PVDF


1
tebal 4 mm aluminium skin 0.3 mm tkdn 61%
a Posisi : Tampak Luar Bangunan pada kolom dan balok silang
3A - K
3A - J
3A - I
3A - G
3A - F
3A - E
3A - D
3A - C
3A - B
4-A
A - 5-
A - 5+
6-A
6-B
6-C
6-D
6-E
7-F
7-G
7-I
7-J
6-K
5- - K
5+ - K
E - 5-
E - 5+
L
L
L
L
M
M
M
M
Sub Jumlah (I

Dikurangi Luas Penampang Balok (Grid L s/d M)

Sub Jumlah (I
a. Jumlah (I-I
NO URAIAN PEKERJAAN

Grid

3
7A

Sub Jumlah (I
Dikurangi Sisi Bagian Kolom (80.60)
SKETSA PEKERJAAN (ACP)

ANALISA PERHITUNGAN

Keliling Tinggi Volume


Progress PK 1 - 50 HK Keterangan
M' M' M²

I II III = I x II IV V

2.720 12.500 34.000 34.000


1.760 12.500 22.000 22.000
1.760 12.500 22.000 22.000
1.760 12.500 22.000 22.000
1.760 12.500 22.000 22.000
T. Depan
1.760 12.500 22.000 22.000
1.760 9.500 16.720 16.720
T. Depan

1.760 9.500 16.720 16.720


1.760 9.500 16.720 16.720
2.560 9.500 24.320 24.320
1.310 9.500 12.445 12.445
T. Kanan
1.500 9.500 14.250 14.250
2.440 9.500 23.180 23.180
1.680 9.500 15.960 15.960
1.770 9.500 16.815 16.815
1.770 9.500 16.815 16.815
1.770 12.500 22.125 22.125
T. Belakang
1.770 12.500 22.125 22.125
1.770 12.500 22.125 22.125
1.760 12.500 22.000 22.000
1.760 12.500 22.000 22.000
2.720 12.500 34.000 34.000
1.310 9.500 12.445 12.445
T. Kiri
1.500 9.500 14.250 14.250
1.028 4.000 4.112
T. Kanan Elv +8.50
1.048 4.000 4.192
3.552 10.900 38.717 38.717
3.552 10.900 38.717 38.717
3.552 10.900 38.717 38.717
3.552 10.900 38.717 38.717
Café
3.552 10.900 38.717 38.717
3.552 10.900 38.717 38.717
2.952 10.900 32.177 32.177
2.952 10.900 32.177 32.177
Sub Jumlah (I) 793.973 785.669
Dimensi Banyak Jumlah Jumlah
Café
0.320 24.000 7.680 7.680
Sub Jumlah (II) 7.680 7.680
a. Jumlah (I-II) 786.293 777.989
Keliling Balok ACP Panjang Volume
Progress PK 1 - 50 HK Keterangan
M' M' M²

I II III = I x II IV V

4.100 56.071 229.891 Depan


4.100 56.071 229.891 Belakang
1.092 4.000 4.368 Luas Penutup Balok
Sub Jumlah (I) 464.150 0.000
Keliling Balok ACP Panjang Volume
0.480 6.000 2.880 0
0.480 6.000 2.880 0
SKETSA PEKERJAAN (CW)

ANALISA PERHITUNGAN

Panjang Tinggi
NO URAIAN PEKERJAAN
M' M'
Pek. Curtain Wall type 1 - T = 11.50 m
3 I II
Posisi : area hall dll
Area Hall = Grid E - K
K3A – J3 5.10 11.5
J3 – I3 5.50 11.5
I3 – G3 10.92 11.5
GA – F3 5.16 11.5
F3 – E3A 5.00 11.5
K7 – K5+ 4.78 11.5
K5+ – K5- 5.12 11.5
K5- – K3A 4.56 11.5
K7 – J7A 5.43 11.5
J7A – I7A 5.40 11.5
I7A – G7A 11.40 11.5
G7A – F7A 5.40 11.5
F7A – E7 5.43 11.5
E7 – E5+ 4.80 3.00
E5+ – E5- 5.40 3.00
E5- – E3A 4.80 3.00
Sub Jumlah (I)
Pengurangan CW (Pintu depan-belakang) 5.40 2.60
Pengurangan CW (Pintu samping) 1.20 2.45
Pengurangan CW (ACP Sirip antar kolom area Hall depan-belakang) 7.20 12.00
Pengurangan CW (ACP Sirip antar kolom area Hall kiri) 1.80 11.50
Pengurangan CW (ACP Sirip antar kolom area Hall kanan elv +8.50) 1.80 3.00
Sub Jumlah (II)
a. Jumlah (I-II)

1068.300

SKETSA PEKERJAAN (CW)


ANALISA PERHITUNGAN

Panjang Tinggi
NO URAIAN PEKERJAAN
M' M'
Pek. Curtain Wall type 1 - T = 8.50 m
3 I II
Posisi : area kelas dll
Area Kelas = Grid A - E
E3 – D3 5.70 9.30
D3 – C3 5.10 9.30
C3 – B4 5.00 9.30
B4 – A4 4.97 9.30
A4 – A5- 2.92 9.30
A5- – A5+ 2.97 9.30
A5+ – A6 2.97 9.30
E7 – D7 5.40 9.30
D7 – C7 5.00 9.30
C7 – B6 5.50 9.30
B6 – A6 5.50 9.30
Sub Jumlah (I)
Pengurangan CW (ACP Sirip antar kolom area Kelas depan-belakang) 6.00 9.30
Pengurangan CW (ACP Sirip antar kolom area Kall kanan) 1.80 3.00
Sub Jumlah (II)
a. Jumlah (I-II)
Volume
Progress PK 1 - 50 HK Keterangan

III = I - II IV V

58.650 58.650
63.250 63.250
125.580 125.580 T. Depan
59.340 59.340
57.500 57.500
54.970 54.970
58.880 58.880 T. Kiri
T. Kiri
52.440 52.440
62.445 0.000
62.100 0.000
131.100 0.000 T. Belakang 131.100
62.100 0.000
62.445 0.000
14.400 0.000 T. Kanan 14.400
16.200 0.000 Elevasi 16.200
14.400 0.000 (+)8.50 14.400
955.800 530.610 Vol. Kotor 176.100
14.040 7.020 (-) Pintu
2.940 2.940 (-) Pintu
86.400 86.400 (-) ACP
20.700 20.700 (-) ACP
5.400 0.000 (-) ACP
129.480 117.060 (-) Total
826.320 413.550 Vol. Bersih

112.500

938.820
Volume
Progress PK 1 - 50 HK Keterangan

III = I - II IV V

53.010 53.010
47.430 47.430
T. Depan
46.500 46.500
46.221 46.221
27.156 27.156
27.621 27.621 T. Kanan
27.621 27.621
50.220
46.500
T. Belakang
51.150
51.150
474.579 275.559 Vol. Kotor
55.800 55.800 (-) ACP
5.400 0.000 (-) ACP
61.200 55.800 (-) Total
413.379 219.759 Vol. Bersih
JENIS PEKERJAAN : Biaya Penyelenggara SMK3 MINGGU
SATUAN PEMBAYAR : Ls XXII
URAIAN ANALISA HARGA SATUAN

KEMAJUAN PEKERJAAN

JUMLAH HARGA PENYELESAIAN PEK. s/d PENYELESAIAN PEK. PENYELESAIAN PEK. s/d Bobot
PERKIRAAN HARGA SATUAN BOBOT MINGGU LALU MINGGU INI MINGGU INI Terhadap
No URAIAN SAT (%) Kontrak
KUANTITAS (Rp)
(Rp) [%]
VOLUME BOBOT VOLUME BOBOT VOLUME BOBOT

1 2 3 4 5 6 7 8 9 10 11 12 13 14

I. Penyiapan RK3K terdiri atas :


a. Pembuatan Manual Prosedur Instruksi Kerja,
Set 1.00 2,000,000 2,000,000 0.9978 - - 0.95 0.9479 0.95 0.9479 95.00
Ijin Kerja
b. Pembuatan Kartu Identitas Pekerja (KIP) Lb -
Sub Jumlah 1 2,000,000 0.9978 - 0.9479 0.9479
2 Sosialisasi dan Promosi K3 terdiri atas :
a. Induksi K3 (Safety Induction) Org
b. Pengarahan K3 (Safety Briefing)
Pertemuan Keselamatan (Safety Talk dan/atau
Org 50.00 50,000.00 2,500,000.00 1.2472 40.00 0.9978 10.00 0.2494 50.00 1.2472 100.00
Tool Box meeting)
c. Pelatihan K3 Org 2.00 1,500,000.00 3,000,000.00 1.4966 1.00 0.7483 1.00 0.7483 2.00 1.4966 100.00
d. Simulasi K3 Org 50.00 50,000.00 2,500,000.00 1.2472 40.00 0.9978 10.00 0.2494 50.00 1.2472 100.00
e. Spanduk (Banner) Lb 5.00 50,000.00 250,000.00 0.1247 5.00 0.1247 - - 5.00 0.1247 100.00
f. Poster Lb 5.00 50,000.00 250,000.00 0.1247 5.00 0.1247 - - 5.00 0.1247 100.00
g. Papan Informasi Bh 2.00 1,500,000.00 3,000,000.00 1.4966 2.00 1.4966 - - 2.00 1.4966 100.00
Sub Jumlah 2 11,500,000.00 5.7371 4.4899 1.2472 5.7371
3 Alat Pelindung Kerja terdiri atas :
(EI-
Kapasitas = {EI-716 x Mb} Kg
731)
a. Jaring Pengaman (Safety Net) Ls 2.00 10,000,000.00 20,000,000.00 9.9776 - - 1.00 4.9888 1.00 4.9888 50.00
Waktu siklus -
b. Tali Keselamatan (Life Line) Ls 1.00 2,000,000.00 2,000,000.00 0.9978 - - 1.00 0.9978 1.00 0.9978 100.00
- Waktu pengeboran dan pembuangan galian -
c. Penahan Jatuh (Safety Deck) Ls 1.00 10,000,000.00 10,000,000.00 4.9888 - - 1.00 4.9888 1.00 4.9888 100.00
d. Pagar Pengaman (Guard Railling) Ls 1.00 10,000,000.00 10,000,000.00 4.9888 - - - - - -
e. Pembatas Area (Restricted Area) Ls 1.00 10,000,000.00 10,000,000.00 4.9888 - - 1.00 4.9888 1.00 4.9888 100.00
- Waktu lain-lain
T1 15.00 menit
T2 45.00 menit
Koefisien Alat / m' T6 15.00 menit
Sub Jumlah 3 52,000,000.00 25.9416 - 15.9641 15.9641
4 Alat pelindung Diri terdiri atas :
a. Topi Pelindung (Safety Helmet) Bh 35.00 60,000.00 2,100,000.00 1.0476 35.00 1.0476 - - 35.00 1.0476 100.00
b. Pelindung Mata (Goggles Spectacles) Psg 10.00 50,000.00 500,000.00 0.2494 10.00 0.2494 - - 10.00 0.2494 100.00
c. Tameng muka (Face Shield) Bh 10.00 35,000.00 350,000.00 0.1746 10.00 0.1746 - - 10.00 0.1746 100.00
d. Masker Selam (Breathing Apparatus) Bh 25,000.00 - -
e. Pelindung Telinga ( Ear plug, Ear Muff) Psg 40,000.00 - -
f. Pelindung Pernafasan dan Mulut (Masker) Bh 3,000.00 - -
g. Sarung Tangan (Safety Gloves) Psg 35.00 5,000.00 175,000.00 0.0873 35.00 0.0873 - - 35.00 0.0873 100.00
h. Sepatu Keselamatan (Safety shoes) Psg 35.00 25,000.00 875,000.00 0.4365 35.00 0.4365 - - 35.00 0.4365 100.00
i. Penunjang Seluruh Tubuh (Full Body Harness) Bh - - -
j. Jaket Pelampung (Live Vest) Bh - - -
k. Rompi Keselamatan (Safety Vest) Bh 35.00 25,000.00 875,000.00 0.4365 35.00 0.4365 - - 35.00 0.4365 100.00
l. Celemek (Apron/Coveralls) Bh - -
m. Pelindung Jatuh (Fall Arrestter) Bh -
Sub Jumlah 4 4,875,000.00 2.4320 2.4320 - 2.4320
5 Asuransi Dan Perijinan terdiri atas :
a. BPJS Ketenagakerjaan Dan Kesehatan Kerja Ls 1.00 50,000,000.00 50,000,000.00 24.9439 1.00 24.9439 - - 1.00 24.9439 100.00
b. Surat Ijin Kelayakan Alat Alat/Kend -
Lb/
c. Surat Ijin Operator -
Alat
d. Surat Ijin Pengesahan Panitia Pembina
Ls
Keselamatan
dan Kesehatan Kerja (P2K3)
Sub Jumlah 5 50,000,000.00 24.9439 24.9439 - 24.9439
6 Personil K3 terdiri dari :
a. Ahli K3 Bln - --
b. Petugas K3/P3K Bln 5.00 4,000,000.00 20,000,000.00 9.9776 4.00 7.9820 1.00 1.9955 5.00 9.9776 100.00
c. Petugas Tanggap Darurat Bln - --
d. Petugas P3K Bln - --
e. Petugas Pengatur Lalu Lintas (Flagman) Bln - --
f. Petugas Medis Bln - --
Sub Jumlah 6 20,000,000.00 9.9776 7.9820 1.9955 9.9776
7 Fasilitas Sarana Kesehatan :
a. Peralatan P3K (Kotak P3K, Tandu, Tabung
Ls 1.00 10,000,000.00 10,000,000.00 4.9888 0.28 1.3969 0.72 3.5919 1.00 4.9888 100.00
oksigen,
b. RuangObat)
P3K (Tempat Tidur Pasien, Stetoskop,
Ls 1.00 15,000,000.00 15,000,000.00 7.4832 0.88 6.5852 0.12 0.8980 1.00 7.4832 100.00
Timbangan)
c. Peralatan Pengasapan (foggging) Bh 1.00 1,000,000.00 1,000,000.00 0.4989 1.00 0.4989 - - 1.00 0.4989 100.00
d. Obat Pengasapan Ls 1.00 100,000.00 100,000.00 0.0499 1.00 0.0499 - - 1.00 0.0499 100.00
Sub Jumlah 7 26,100,000.00 13.0207 8.5308 4.4899 13.0207
8 Rambu - Rambu terdiri atas :
a. Rambu Petunjuk Bh 10.00 25,000.00 250,000.00 0.1247 10.00 0.1247 - - 10.00 0.1247 100.00
b. Rambu Larangan Bh 5.00 25,000.00 125,000.00 0.0624 5.00 0.0624 - - 5.00 0.0624 100.00
c. Rambu Peringatan Bh 10.00 25,000.00 250,000.00 0.1247 10.00 0.1247 - - 10.00 0.1247 100.00
d. Rambu Kewajiban Bh 5.00 25,000.00 125,000.00 0.0624 5.00 0.0624 - - 5.00 0.0624 100.00
e. Rambu informasi Bh 5.00 25,000.00 125,000.00 0.0624 5.00 0.0624 - - 5.00 0.0624 100.00
f. Rambu Pekerjaan Sementara Bh 10.00 25,000.00 250,000.00 0.1247 10.00 0.1247 - - 10.00 0.1247 100.00
g. Tongkat Pengatur Lalu lintas (Warning Light
Bh 2.00 75,000.00 150,000.00 0.0748 2.00 0.0748 - - 2.00 0.0748 100.00
Sticks)
h. Kerucut Lalu Lintas Bh 10.00 55,000.00 550,000.00 0.2744 10.00 0.2744 - - 10.00 0.2744 100.00
i. Lampu Putar (Rotary Lamp) Bh 2.00 125,000.00 250,000.00 0.1247 2.00 0.1247 - - 2.00 0.1247 100.00
j. Lampu Selang Lalu Lintas Ls 1.00 100,000.00 100,000.00 0.0499 1.00 0.0499 - - 1.00 0.0499 100.00
Sub Jumlah 8 2,175,000.00 1.0851 1.0851 - 1.0851
9 Lain - lain Terkait Pengendalian Resiko K3
a. Alat Pemadam Api Ringan (APAR) - 5 kg Bh 3.00 3,500,000.00 10,500,000.00 5.2382 3.00 5.2382 - - 3.00 5.2382 100.00
b. Sirine Bh 2.00 250,000.00 500,000.00 0.2494 2.00 0.2494 - - 2.00 0.2494 100.00
c. Bendera K3 Bh 3.00 100,000.00 300,000.00 0.1497 3.00 0.1497 - - 3.00 0.1497 100.00
d. Jalur Evakuasi (Escape Route) Ls 2.00 5,000,000.00 10,000,000.00 4.9888 2.00 4.9888 - - 2.00 4.9888 100.00
e. Lampu Darurat (Emergency Lamp) Bh 4.00 125,000.00 500,000.00 0.2494 4.00 0.2494 - - 4.00 0.2494 100.00
f. Program Inspeksi dan Audit Internal Ls 1.00 5,000,000.00 5,000,000.00 2.4944 - - 0.95 2.3697 0.95 2.3697 95.00
g. Pelaporan dan Penyelidikan Insiden Ls 1.00 5,000,000.00 5,000,000.00 2.4944 - - 0.95 2.3697 0.95 2.3697 95.00
Sub Jumlah 9 31,800,000.00 15.8643 10.8755 4.7393 15.6149

TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 200,450,000.00 100.00 60.34 29.38 89.72

35
LAPORAN KEMAJUAN PEKERJAAN

PROGRAM : PENGEMBANGAN PENYELENGGARAAN PENATAAN BANGUNAN DAN LINGKUNGAN NOMOR LKP : 004/LKP/TJK-PME/QC/2021
KEGIATAN : PEMBANGUNAN QUR'AN CENTRE TANGGAL LKP : 30 Desember 2021
PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE MINGGU KE : 22 (DUA PULUH DUA)
LOKASI : PEKANBARU, RIAU
TAHUN : 2021
KONTRAKTOR : PT. CIPTA ADHI GUNA
NOMOR : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 TANGGAL KONTRAK : 03 Agustus 2021
ADDENDUM II : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05B TANGGAL KONTRAK : 20 Agustus 2021
ADDENDUM III : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/X/2021/05C TANGGAL KONTRAK : 26 Oktober 2021
ADDENDUM IV : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/XII/2021/05D TANGGAL KONTRAK : 27 Desember 2021

KONTRAK MC-0/ ADDENDUM ADDENDUM IV PERIODE INI


NO URAIAN PEKERJAAN ADDENDUM II III SISA BOBOT (%) PRESTASI (%)
BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%) BOBOT (%)
1 2 4 4 4 4 6 8

I PEKERJAAN PERSIAPAN 1.794 1.799 1.893 1.893 1.893 -

II PEKERJAAN STRUKTUR 68.516 70.215 73.876 66.005 66.005 -


II.1 PEKERJAAN TANAH 1.278 0.573 1.275 1.286 1.286 - 100.000
II.1A PEKERJAAN LANTAI - 2.031 2.045 2.045 2.045 - 100.000

II.2 PEKERJAAN PONDASI DALAM DAN SLOOF 24.057 25.594 23.297 23.169 23.169 - 100.000
II.2.1 PEKERJAAN PONDASI DALAM 14.583 16.120 15.432 15.432 15.432 - 100.000
II.2.2 PEKERJAAN BETON PILE CAP 2.866 2.866 3.122 3.122 3.122 - 100.000
II.2.3 PEKERJAAN BETON SLOOF 6.608 6.608 4.742 4.615 4.615 - 100.000

II.3 PEKERJAAN BETON STRUKTUR ATAS 43.182 42.017 47.260 39.505 39.505 - 100.000
II.3.1 BETON KOLOM PEDESTAL 2.538 2.199 2.861 2.924 2.924 - 100.000
II.3.2 ELEVASI ± 0.00 6.648 6.648 8.524 7.630 7.630 - 100.000
II.3.3 ELEVASI + 2.00 0.081 0.081 0.046 0.046 0.046 - 100.000
II.3.5 ELEVASI + 4.50 15.453 14.628 17.218 13.513 13.513 - 100.000
II.3.6 ELEVASI + 8.00 3.104 3.104 - - - -
II.3.7 ELEVASI + 8.50 4.490 4.490 4.413 3.879 3.879 - 100.000
II.3.8 ELEVASI + 11.00 4.425 4.425 5.160 3.205 3.205 - 100.000
II.3.9 ELEVASI + 11.50 6.444 6.444 9.037 8.308 8.308 - 100.000

III PEKERJAAN ARSITEKTUR 29.051 27.348 23.592 30.139 28.952 1.187


III.1 LANTAI SATU 0.556 0.758 0.873 2.435 2.154 0.282
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 0.426 0.627 0.791 2.353 2.154 0.200 91.515
III.1.2 PEKERJAAN TANGGA 0.130 0.130 0.082 0.082 - 0.082 -

III.2 FINISHING LUAR GEDUNG 28.495 26.590 22.719 27.704 26.799 0.905
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 11.951 11.951 7.728 13.825 12.973 0.853 93.833
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 10.775 10.775 8.804 7.756 7.704 0.052 99.323
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 5.769 3.864 6.187 6.122 6.122 - 100.000
-
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 0.639 0.639 0.639 1.963 0.436 1.527
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 0.042 0.042 0.042 0.042 - 0.042 -
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG 0.196 0.196 0.196 0.192 0.178 0.015 92.424
IV.3 INSTALASI PEMPIPAAN AIR HUJAN 0.401 0.401 0.401 0.375 0.258 0.117 68.842
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK 0.940 - 0.940 -
IV.5 PEKERJAAN PENANGKAL PETIR - - - 0.414 - 0.414 -

TOTAL 100.0000 100.0000 100.0000 100.0000 97.2865 2.7135

Berdasarkan hasil perhitungan bersama pada tanggal 30 Desember 2021, bahwa hasil pekerjaan sampai pada minggu ke-22 (Dua Puluh Dua) yaitu sampai dengan tanggal
30 Desember 2021 adalah sebesar 75.8139 % (Tujuh Puluh Lima Koma Delapan Persen). Kontraktor Pelaksana dapat dibayarkan sebesar 75.8139 % (Tujuh Puluh Lima
Koma Delapan Persen).

Pekanbaru, 30 Desember 2021

Disetujui : Diketahui : Dibuat Oleh :


DINAS PU-CIPTA KARYA Manajemen Konstruksi (MK) Kontraktor Pelaksana

Pejabat Pelaksana Teknis Kegiatan (PPTK) PT. TUJUH JAYA KONSULTAN, PT. CIPTA ADHI GUNA
KSO PT. PANCA MANDIRI ENGINEERING

DEKO FAHRUZIL, ST CHOIRUS SUBECHAN, ST., M.Si Ir. MULYADI TANJUNG, MT


NIP. 19870405 201102 1 002 Team Leader Project Manager
RE-SCHEDULE

Kegiatan : Pembangunan Qur'an Centre


Pekerjaan : Pekerjaan Fisik Pembangunan Qur'an Centre
No. Kontrak : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 Tgl. Kontrak : ###
No. Addendum I : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 Tgl. Addendum I : 09 Agustus 2021
No. Addendum II : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05B Tgl. Addendum II : 20 Agustus 2021
No. Addendum III : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/X/2021/05C Tgl. Addendum III : 28 Oktober 2021
No. Addendum IV : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/XII/2021/05D Tgl. Addendum IV : ###
Lokasi : Pekanbaru
Tahun Anggaran : 2021

Bulan Ke-
I II III IV V VI VII VIII
Minggu
Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke-
BOBOT Ke-
NO URAIAN PEKERJAAN Ket.
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29
3-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec 31-Dec 3-Jan 10-Jan 17-Jan 24-Jan 31-Jan 7-Feb 14-Feb
PMK
8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 30-Dec 2-Jan 9-Jan 16-Jan 23-Jan 30-Jan 6-Feb 13-Feb 18-Feb

I PEKERJAAN PERSIAPAN 1.893 0.300 0.300 0.300 0.300 0.300 0.228 0.166 100 ###
###
II PEKERJAAN STRUKTUR ###
II.1 PEKERJAAN TANAH 1.286 0.321 0.321 0.321 0.321 P ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF E ###
II.1A PEKERJAAN LANTAI 2.045 0.339 0.339 0.339 0.339 0.339 0.173 N 0.089 0.089
90 ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF Y ###
II.2.1 PEKERJAAN PONDASI DALAM 15.432 0.846 0.846 0.846 0.846 0.846 3.184 3.184 2.338 2.496 E ###
II.2.2 PEKERJAAN BETON PILE CAP 3.122 0.624 0.624 0.624 0.624 0.624 L ###
II.2.3 PEKERJAAN BETON SLOOF 4.615 0.358 0.358 0.358 0.358 1.725 1.458 E ###
II.3 PEKERJAAN BETON STRUKTUR ATAS S 80 ###
II.3.1 BETON KOLOM PEDESTAL 2.924 0.647 0.226 0.226 0.226 0.226 0.647 0.726 A ###
II.3.2 ELEVASI ± 0.00 7.630 1.451 1.451 0.169 0.169 0.169 0.169 0.169 1.851 1.809 I 0.224 ###
II.3.3 ELEVASI + 2.00 0.046 0.046 A ###
II.3.5 ELEVASI + 4.50 13.513 2.198 1.322 1.322 1.322 1.322 1.322 2.054 1.290 N 0.682 0.682 ###
II.3.6 ELEVASI + 8.00 0.000 70 ###
II.3.7 ELEVASI + 8.50 3.879 0.898 0.898 0.898 1.185 P ###
II.3.8 ELEVASI + 11.00 3.205 0.885 0.885 0.885 0.550 E ###
II.3.9 ELEVASI + 11.50 8.308 1.961 0.447 0.447 0.447 1.164 2.328 1.514 K ###
E ###
III PEKERJAAN ARSITEKTUR R
60 ###
III.1 LANTAI SATU J ###
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 2.353 0.401 A 0.651 0.651 0.651 ###
III.1.2 PEKERJAAN TANGGA 0.082 A 0.082 ###
III.2 FINISHING LUAR GEDUNG N 50 ###
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 13.825 2.987 0.864 0.864 0.864 0.872 0.900 0.880 0.660 2.000 ###
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 7.756 1.470 P 0.055 0.055 0.178 0.178 0.550 5.000 2.225 ###
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 6.122 1.608 1.608 1.608 M 0.649 0.649 ###
K ###
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING 40 ###
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG ###
50
IV.1.1 SHAFT PIPA 0.042 0.021 0.021 ###
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG ###
IV.2.1 SHAFT PIPA 0.014 0.014 H ###
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.076 A 0.038 0.038
30 ###
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.044 R 0.022 0.022 ###
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.059 I 0.029 0.029 ###
IV.3 INSTALASI PEMPIPAAN AIR HUJAN ###
K
IV.3.1 PIPA TEGAK 0.258 0.106 0.152
20 ###
IV.3.2 LANTAI DAK FFL. ±12.000 0.007 A 0.007 ###
IV.3.3 LANTAI DAK FFL. ±8.000 0.006 L 0.006 ###
IV.3.4 LANTAI DUA 0.000 E ###
IV.3.5 LANTAI SATU 0.058 N 0.058 ###
IV.3.6 LANTAI DAK FFL. ±14.50 0.045 D 0.045 10 ###
E ###
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK R ###
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 0.236 0.236 ###
IV.4.2 FASADE 0.704 0.352 0.352 ###
IV.5 PEKERJAAN PENANGKAL PETIR 00 ###
IV.5.1 GEDUNG UTAMA (Pengadaan dan pemasangan peralatan penangkal petir) 0.414 0.207 0.207 ###

100.000
Bobot Per Minggu 1.976 2.563 2.434 1.843 2.223 6.770 2.885 2.559
Rencana
Komulatif Bobot Per Minggu 0 77.744 80.307 82.741 84.584 86.807 93.577 96.462 99.021
Kontrak ADD V
Bobot Per Minggu 0.300 0.300 0.300 1.467 1.467 1.395 1.167 2.117 5.485 8.041 6.320 9.292 5.170 6.797 4.284 5.242 9.884 1.514 0.000 1.608 2.009 1.608
Realisasi
Komulatif Bobot Per Minggu 0.300 0.600 0.899 2.367 3.834 5.229 6.397 8.514 14.000 22.041 28.361 37.652 42.822 49.619 53.903 59.145 69.029 70.543 70.543 72.151 74.160 75.768
DEVIASI
WAKTU PELAKSANAAN : 150 (SERATUS LIMA PULUH) HARI KALENDER + MASA PELAKSANAAN PMK 50 (LIMA PULUH) HARI KALENDER

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


DINAS PU-CIPTA KARYA Manajemen Konstruksi (MK) Kontraktor Pelaksana
Pejabat Pembuat Komitmen (PPK) PT. TUJUH JAYA KONSULTAN, KSO PT. PANCA MANDIRI ENGINEERING PT. CIPTA ADHI GUNA

DEKO FAHRUZI, ST CHOIRUS SUBECHAN, ST. M.Si Ir. MULYADI TANJUNG, MT


NIP. 19870405 201102 1 002 Team Leader Project Manager
JADWAL PELAKSANAAN
Kegiatan : Pembangunan Qur'an Centre
Pekerjaan : Pekerjaan Fisik Pembangunan Qur'an Centre
No. Kontrak : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 Tgl. Kontrak : ###
No. Addendum I : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05 Tgl. Addendum I : 09 Agustus 2021
No. Addendum II : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/VIII/2021/05B Tgl. Addendum II : 20 Agustus 2021
No. Addendum III : 645.8/PUPRPKPP-CK/KONTRAK-Fsk.QURAN CENTRE/X/2021/05C Tgl. Addendum III : 28 Oktober 2021
Lokasi : Pekanbaru
Tahun Anggaran : 2021

Bulan Ke-
I II III IV V VI
BOBOT Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke- Minggu Ke-
NO URAIAN PEKERJAAN 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Ket.
(%)
3-Aug 9-Aug 16-Aug 23-Aug 30-Aug 6-Sep 13-Sep 20-Sep 27-Sep 4-Oct 11-Oct 18-Oct 25-Oct 1-Nov 8-Nov 15-Nov 22-Nov 29-Nov 6-Dec 13-Dec 20-Dec 27-Dec
8-Aug 15-Aug 22-Aug 29-Aug 5-Sep 12-Sep 19-Sep 26-Sep 3-Oct 10-Oct 17-Oct 24-Oct 31-Oct 7-Nov 14-Nov 21-Nov 28-Nov 5-Dec 12-Dec 19-Dec 26-Dec 30-Dec

I PEKERJAAN PERSIAPAN 1.893 0.316 0.316 0.316 0.316 0.316 0.316 100 ###
###
II PEKERJAAN STRUKTUR ###
II.1 PEKERJAAN TANAH 1.286 0.321 0.321 0.321 0.321 ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF ###
II.1A PEKERJAAN LANTAI 2.045 0.341 0.341 0.341 0.341 0.341 0.341 90 ###
II.2 PEKERJAAN PONDASI DALAM DAN SLOOF ###
II.2.1 PEKERJAAN PONDASI DALAM 15.432 1.715 1.715 1.715 1.715 1.715 1.715 1.715 1.715 1.715 ###
II.2.2 PEKERJAAN BETON PILE CAP 3.122 0.624 0.624 0.624 0.624 0.624 ###
II.2.3 PEKERJAAN BETON SLOOF 4.615 0.769 0.769 0.769 0.769 0.769 0.769 ###
II.3 PEKERJAAN BETON STRUKTUR ATAS 80 ###
II.3.1 BETON KOLOM PEDESTAL 2.924 0.418 0.418 0.418 0.418 0.418 0.418 0.418 ###
II.3.2 ELEVASI ± 0.00 7.630 0.848 0.848 0.848 0.848 0.848 0.848 0.848 0.848 0.848 ###
II.3.3 ELEVASI + 2.00 0.046 0.046 ###
II.3.5 ELEVASI + 4.50 13.513 1.689 1.689 1.689 1.689 1.689 1.689 1.689 1.689 ###
II.3.6 ELEVASI + 8.00 0.000
70 ###
II.3.7 ELEVASI + 8.50 3.879 0.970 0.970 0.970 0.970 ###
II.3.8 ELEVASI + 11.00 3.205 0.801 0.801 0.801 0.801 ###
II.3.9 ELEVASI + 11.50 8.308 1.187 1.187 1.187 1.187 1.187 1.187 1.187 ###
###
III PEKERJAAN ARSITEKTUR 60 ###
III.1 LANTAI SATU ###
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING 2.353 2.353 ###
III.1.2 PEKERJAAN TANGGA 0.082 0.082 ###
III.2 FINISHING LUAR GEDUNG ###
III.2.1 PEKERJAAN FINISHING LUAR BANGUNAN 13.825 2.3042315 2.3042315 2.3042315 2.3042315 2.3042315 2.3042315
50 ###
III.2.2 PEKERJAAN KUSEN PINTU DAN CURTAIN WALL 7.756 1.551 1.551 1.551 1.551 1.551 ###
III.2.3 PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA 6.122 2.041 2.041 2.041 ###
###
IV PEKERJAAN MEKANIKAL ELEKTRIKAL DAN PLUMBING ###
IV.1 INSTALASI PEMPIPAAN AIR BERSIH DALAM GEDUNG 40 ###
IV.1.1 SHAFT PIPA 0.042 0.042 ###
IV.2 INSTALASI AIR BEKAS, KOTOR, DAN VENT DALAM GEDUNG ###
IV.2.1 SHAFT PIPA 0.014 0.014 ###
IV.2.2 LANTAI SATU GEDUNG UTAMA 0.076 0.076 ###
IV.2.3 LANTAI DUA GEDUNG UTAMA 0.044 0.044
30 ###
IV.2.4 LANTAI TIGA GEDUNG UTAMA 0.059 0.059 ###
IV.3 INSTALASI PEMPIPAAN AIR HUJAN ###
IV.3.1 PIPA TEGAK 0.258 0.258 ###
IV.3.2 LANTAI DAK FFL. ±12.000 0.007 0.007 ###
20
IV.3.3 LANTAI DAK FFL. ±8.000 0.006 0.006 ###
IV.3.4 LANTAI DUA - ###
IV.3.5 LANTAI SATU 0.058 0.058 ###
IV.3.6 LANTAI DAK FFL. ±14.50 0.045 0.045 ###
###
IV.4 LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK
10 ###
IV.4.1 LANTAI DAK FFL. ±12.000 + C1385 0.236 0.236 ###
IV.4.2 FASADE 0.704 0.704 ###
IV.5 PEKERJAAN PENANGKAL PETIR ###
IV.5.1 GEDUNG UTAMA (Pengadaan dan pemasangan peralatan penangkal p 0.414 0.414 ###
00
100.000
Bobot Per Minggu 0.316 0.316 0.316 2.352 2.352 2.352 2.036 2.757 3.605 6.063 7.420 9.361 7.022 7.022 5.635 4.198 7.680 5.300 3.951 6.000 8.485 5.463
Rencana
Komulatif Bobot Per Minggu 0 0.316 0.631 0.947 3.298 5.650 8.002 10.038 12.795 16.400 22.463 29.882 39.244 46.266 53.288 58.923 63.121 70.801 76.101 80.052 86.052 94.537 100.000
Kontrak ADD V
Bobot Per Minggu
Realisasi
Komulatif Bobot Per Minggu
DEVIASI
WAKTU PELAKSANAAN : 150 (SERATUS LIMA PULUH) HARI KALENDER

Diperiksa Oleh : Diperiksa Oleh : Dibuat Oleh :


DINAS PU-CIPTA KARYA Manajemen Konstruksi (MK) Kontraktor Pelaksana
Pejabat Pembuat Komitmen (PPK) PT. TUJUH JAYA KONSULTAN, KSO PT. PANCA MANDIRI ENGINEERING PT. CIPTA ADHI GUNA
DEKO FAHRUZI, ST CHOIRUS SUBECHAN, ST. M.Si Ir. MULYADI TANJUNG, MT
NIP. 19870405 201102 1 002 Team Leader Project Manager
1 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium skin 0.3 mm tkdn 61%
a Posisi : Tampak Luar Bangunan pada kolom dan balok silang

Perhitungan
No. Sketsa Gambar Keliling
Grid Tinggi (m) Jumlah (m2) Ket
Kolom (m)

3A - K 2.720 12.500 34.000 T. Depan


3A - J 1.760 12.500 22.000
3A - I 1.760 12.500 22.000
3A - G 1.760 12.500 22.000
3A - F 1.760 12.500 22.000
3A - E 1.760 12.500 22.000
3A - D 1.760 9.500 16.720
3A - C 1.760 9.500 16.720
3A - B 1.760 9.500 16.720
4-A 2.560 9.500 24.320
A - 5- 1.310 9.500 12.445 T. Kanan
A - 5+ 1.500 9.500 14.250
6-A 2.440 9.500 23.180 T. Belakang
6-B 1.680 9.500 15.960
6-C 1.770 9.500 16.815
6-D 1.770 9.500 16.815
6-E 1.770 12.500 22.125
7-F 1.770 12.500 22.125
7-G 1.770 12.500 22.125
7-I 1.760 12.500 22.000
7-J 1.760 12.500 22.000
6-K 2.720 12.500 34.000
5- - K 1.310 9.500 12.445 T. Kiri
5+ - K 1.500 9.500 14.250
E - 5- 1.028 4.000 4.112 T. Kanan-Atas
E - 5+ 1.048 4.000 4.192
L 3.552 10.900 38.717 Café
L 3.552 10.900 38.717
L 3.552 10.900 38.717
L 3.552 10.900 38.717
M 3.552 10.900 38.717
M 3.552 10.900 38.717
M 2.952 10.900 32.177
M 2.952 10.900 32.177
Sub Jumlah (I) 793.973 m2
Dikurangi Luas Penampang Balok
Δ Dimensi
Grid Banyak Jumlah (m2)
Balok 40.80
L s/d M 0.320 24.000 7.680 Café
Sub Jumlah (II) 7.680 m2

a. Jumlah (I-II) 786.293 m2

Keliling Balok
Grid Panjang Jumlah (m2) Ket
ACP

3 4.100 56.071 229.891 Depan


7A 4.100 56.071 229.891 Belakang
Luas Penutup
1.092 4.000 4.368
Balok
Sub Jumlah (I) 464.150 m2
Dikurangi Sisi Bagian Kolom (80.60)
3 0.480 6.000 2.880 Depan
7A 0.480 6.000 2.880 Belakang
Sub Jumlah (II) 5.760 m2

Jumlah (I-II) = (I) 458.390 m2

Balok List (Dinding Parapet)


4 A-E 0.800 20.800 16.640 Depan
6 A-E 0.800 20.800 16.640 Belakang
A 0.800 10.000 8.000 Kanan
Jumlah (II) 41.280 m2
b. Jumlah (I+II) 499.670 m2

List Sirip Vertical ACP di CW


Keliling
Banyak/ Grid Tinggi (m) Jumlah (m2) Ket
Balok15.15
4 A-K
20.000 0.450 9.450 85.050 Depan
30.000 0.450 12.450 168.075
6 A-K
20.000 0.450 9.450 85.050 Belakang
10.000 0.450 8.504 38.266 Varian
c. Jumlah 376.441 m2

Posisi : Tampak Luar Bangunan pada kolom dan balok silang Total 1,662.41 m2

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. Tujuh Jaya Konsultan, KSO PT. Cipta Adhi Guna
PT. Panca Mandiri Engineering

Dwi Joko Suprayitno, ST Arismanto, ST


Ahli Struktur/ Sipil Pelaksana
1 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium skin 0.3 mm tkdn 61%
a Posisi : Tampak Luar Bangunan pada kolom dan balok silang
Perhitungan
Simbol Jumlah
No. Sketsa Gambar
Keliling Tinggi (m) Jumlah (m2) Ket
Grid a/1 b/2 c/3 d/4 Kolom (m)
Rangka+ACP Kolom Struktur
3A - K 0.400 0.960 0.960 0.400 2.720 12.500 34.000 T. Depan
3A - J 0.400 0.960 0.400 1.760 12.500 22.000
3A - I 0.400 0.960 0.400 1.760 12.500 22.000
a
3A - G 0.400 0.960 0.400 1.760 12.500 22.000
3A - F 0.400 0.960 0.400 1.760 12.500 22.000
b 3A - E 0.400 0.960 0.400 22.000
1.760 12.500
d
3A - D 0.400 0.960 0.400 1.760 9.500 16.720
c 3A - C 0.400 0.960 0.400 1.760 9.500 16.720
3A - B 0.400 0.960 0.400 1.760 9.500 16.720
4-A 0.220 1.170 0.950 0.220 2.560 9.500 24.320
A - 5- 0.170 0.970 0.170 1.310 9.500 12.445 T. Kanan
A - 5+ 0.170 1.160 0.170 1.500 9.500 14.250
6-A 0.160 1.060 1.060 0.160 2.440 9.500 23.180 T. Belakang
6-B 0.400 0.880 0.400 1.680 9.500 15.960
6-C 0.400 0.970 0.400 1.770 9.500 16.815
a c 6-D 0.400 0.970 0.400 1.770 9.500 16.815
b 6-E 0.400 0.970 0.400 1.770 12.500 22.125
7-F 0.400 0.970 0.400 1.770 12.500 22.125
7-G 0.400 0.970 0.400 1.770 12.500 22.125
7-I 0.400 0.960 0.400 1.760 12.500 22.000
7-J 0.400 0.960 0.400 1.760 12.500 22.000
3 6-K 0.400 0.960 0.960 0.400 2.720 12.500 34.000
5- - K 0.130 1.000 0.130 1.260 9.500 11.970 T. Kiri
4 2 5+ - K 0.170 1.000 0.170 1.340 9.500 12.730
E - 5- 0.170 0.688 0.170 1.028 4.000 4.112 T. Kanan-Atas
E - 5+ 0.180 0.688 0.180 1.048 4.000 4.192
1 L 0.970 0.970 0.970 0.970 Kolom el.11.00
3.880 10.900
L 0.970 0.970 0.970 0.970 3.880 10.900
L 0.970 0.970 0.970 0.970 3.880 10.900
L 0.970 0.970 0.970 0.970 3.880 10.900
M 0.970 0.970 0.970 0.970 3.880 10.900
M 0.970 0.970 0.970 0.970 3.880 10.900
M 0.970 0.970 0.970 0.970 3.880 10.900
M 0.970 0.970 0.970 0.970 3.880 10.900
Sub Jumlah (I) 495.324 m2
a. Jumlah (I) 495.324 m2

Keliling Balok
Grid a/1 b/2 c/3 d/4 Panjang Jumlah (m2) Ket
ACP
c Rangka+ACP Entrance
c
3 1.460 1.000 1.460 1.000 4.920 56.070 275.864 Depan
7A 1.300 1.000 1.300 1.000 4.600 56.070 257.922 Belakang
3 1.460 1.000 1.460 2.000 2.920 Penutup Balok
d b 7A 1.300 1.000 1.300 2.000 2.600 Penutup Balok
Sub Jumlah (I) 536.706 m2
Dikurangi Sisi Bagian Kolom (80.60)
3 0.480 6.000 2.880 Depan
a 7A 0.480 6.000 2.880 Belakang
Sub Jumlah (II) 5.760 m2

1000

5707

9328

7000 12000

K J I H G F E D

Rangka+ACP Balok List (Dinding Parapet)


4 A-E 0.050 0.400 0.250 0.100 0.800 20.800 16.640 Depan
6 A-E 0.050 0.400 0.250 0.100 0.800 20.800 16.640 Belakang
A 0.050 0.400 0.250 0.100 0.800 10.000 8.000 Kanan
Sub Jumlah (III) 41.280 m2
d
Rangka+ACP Balok List (Dinding Parapet)
3 0.050 0.700 0.250 0.100 1.100 20.800 22.880 Depan
b 7A 0.050 0.700 0.250 0.100 1.100 20.800 22.880 Belakang
E 0.050 0.700 0.250 0.100 1.100 15.030 Kanan
K 0.050 0.700 0.250 0.100 1.100 15.030 Kiri
Sub Jumlah (IV) 45.760 m2
a
Depan
b

a
Depan b. Jumlah (I+II+III+IV) 629.506 m2

Catatan :
- Satuan Pada Sketsa Gambar Milimeter (mm)
- Satuan Pada Perhitungan Kuantitas Meter (m)

Rangka+ACP List Sirip Vertical di CW


Banyak/ Keliling
a b c d Tinggi (m) Jumlah (m2) Ket
d Grid
4 A-K
Balok15.15

20.000 0.150 0.150 0.150 0.150 0.600 9.450 113.400 Depan


24.000 0.150 0.150 0.150 0.150 0.600 12.000 172.800
a c Banyak
44.000
P
0.150
L
0.150
Luas (m2)
0.023
Jumlah (m2)
Penutup Atas
6 A-E
20.000 0.150 0.150 0.150 0.150 0.600 9.450 113.400 Belakang
b 24.000
9.000
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.150
0.600
0.600
12.000
9.450
172.800
51.030 Kanan
12.000 0.150 0.150 0.150 0.150 0.600 12.000 86.400 Kiri
Banyak P L Luas (m2) Jumlah (m2)
65.000 0.150 0.150 0.023 Penutup Atas
c. Jumlah 709.830 m2
Rangka+ACP Kusen Pintu
2700 Grid a (m2) b (m2) c (m2) tb (m) Jumlah (m2) Ket
3 0.810 0.995 0.995 2.799 Sisi Depan
300 a 0.810 0.995 0.995 2.799 Sisi Belakang
2.700 2.510 2.510 0.360 2.779 Sisi Samping/Atas

2210 b c

450 1800 450

7 0.781 0.698 0.698 2.176 Sisi Depan


2440
0.781 0.698 0.698 2.176 Sisi Belakang
320 a 2.440 2.500 2.500 0.200 1.488 Sisi Samping/Atas

2180 b c

320 1800 320

150 a

K 0.180 0.341 0.341 0.861 Sisi Depan


0.180 0.341 0.341 0.861 Sisi Belakang
2270 b c
1.200 2.420 2.420 0.200 1.208 Sisi Samping/Atas

150 900 150


2270 b c

150 900 150 d. Jumlah 17.147 m2

Posisi : Tampak Luar Bangunan pada kolom dan balok silang Total 1,851.81 m2

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. Tujuh Jaya Konsultan, KSO PT. Cipta Adhi Guna
PT. Panca Mandiri Engineering

Sunu Satriyo Waskito, ST Jatmico Setiawan, ST


Ahli Arsitektur Site Manager
b Posisi : leher atap dan background logo
Keliling Balok
No Sketsa Gambar Grid a/1 b/2 c/3 d/4 Panjang Jumlah (m2) Ket
ACP
Rangka+ACP Leher Atap
3 1.460 1.000 1.460 1.000 4.920 44.000 216.480 Depan
7A 1.300 1.000 1.300 1.000 4.600 44.000 202.400 Belakang
3 1.460 1.000 1.460 2.000 2.920 Penutup Balok
7A 1.300 1.000 1.300 2.000 2.600 Penutup Balok

Sub Jumlah I 421.800 m2

8000

1000

14000

K J I H G F E D

Keliling Balok
Grid a/1 b/2 c/3 d/4 Panjang Jumlah (m2) Ket
ACP
Rangka+ACP List Logo
3 1.300 1.000 1.300 1.000 4.600 29.760 136.896 Depan
7A 1.300 1.000 1.300 1.000 4.600 29.760 136.896 Belakang
Sub Jumlah II 273.792 m2

6215

3858
3858

7915 7915

K J I H G F E D

Grid Luas Banyak Warna Jumlah (m2) Ket


Rangka+ACP background Logo
3 39.696 1.000 Kuning 39.696 Depan
39.696 1.000 Hijau 39.696

7A 39.696 1.000 Kuning 39.696 Belakang


39.696 1.000 Hijau 39.696

Sub Jumlah III 158.784 m2

5851

3080 3080

2 La p is Le m b a r ACP
Lu a s : 3 9 ,6 9 6 m 2

6899 6899

K J I H G F E D

Posisi : leher atap dan background logo Total (I+II+III) 854.376 m2

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. Tujuh Jaya Konsultan, KSO PT. Cipta Adhi Guna
PT. Panca Mandiri Engineering

Sunu Satriyo Waskito, ST Jatmico Setiawan, ST


Ahli Arsitektur Site Manager
c Posisi : Keliling sisi samping atap
Keliling
No. Sketsa Gambar Grid a b c d Panjang Jumlah (m2) Ket
Balok ACP
Rangka+ACP List Logo
Gording D 0.150 1.000 0.500 1.650 21.000 34.650 Depan
a Rangka Baja Atap K 0.150 1.000 0.500 1.650 21.000 34.650 Belakang
WF

c
Total 69.300 m2

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. Tujuh Jaya Konsultan, KSO PT. Cipta Adhi Guna
PT. Panca Mandiri Engineering

Sunu Satriyo Waskito, ST Jatmico Setiawan, ST


Ahli Arsitektur Site Manager
Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm

No. Sketsa Gambar Grid Luas Banyak Warna Jumlah (m2) Ket

Rangka+ACP background Logo


3 69.821 1.000 Biru 69.821 Depan
4380 4380
7A 69.821 1.000 Biru 69.821 Belakang

8930
8930

14847 14847

K J I H G F E D

Total 139.642 m2

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. Tujuh Jaya Konsultan, KSO PT. Cipta Adhi Guna
PT. Panca Mandiri Engineering

Sunu Satriyo Waskito, ST Jatmico Setiawan, ST


Ahli Arsitektur Site Manager
Pek. Curtain Wall type 1 - T = 11.50 m Posisi : area hall dll

Dikurangi
Jumlah Vertical Sirip ACP dan Pintu
Grid Panjang Tinggi Total (m2) Ket
(m2) Jumlah
Lebar Tinggi Banyak
(m2)
1 2 3 4 5 6 7 8 (5x6x7) 9 (4-8) 10

3 E-K 32.300 11.600 374.680 0.150 11.600 24.000 41.760 Depan


2.700 2.510 1.000 6.777 Pintu

374.680 48.537 326.143

7 G-I 32.300 11.600 374.680 0.150 11.600 24.000 41.760 Belakang


2.440 2.500 1.000 6.100 Pintu

374.680 47.860 326.820

3A-7A 15.030 11.600 174.348 0.150 11.600 12.000 20.880 Kiri


1.200 2.420 1.000 2.904 Pintu

174.348 23.784 150.564

E (3A-7A) 15.030 3.600 54.108 0.150 3.900 12.000 7.020 Kanan Atas

54.108 7.020 47.088


850.615 m2

Pek. Curtain Wall type 2 - T = 8.50 m Posisi : area kelas dll

Dikurangi
Jumlah Vertical Sirip ACP dan Pintu
Grid Panjang Tinggi Total (m2) Ket
(m2) Jumlah
Lebar Tinggi Banyak
(m2)
1 2 3 4 5 6 7 8 (5x6x7) 13 ((4-(8+12)) 14

A-E 20.760 9.150 189.954 0.150 9.150 20.000 27.450 Depan

189.954 27.450 162.504

A-E 20.785 9.150 189.954 0.150 9.150 20.000 27.450 Belakang

189.954 27.450 162.504

E (3A-7A) 9.860 9.150 90.219 0.150 9.150 9.000 12.353 Kanan

90.219 12.353 77.867


402.875 m2

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. Tujuh Jaya Konsultan, KSO PT. Cipta Adhi Guna
PT. Panca Mandiri Engineering
Sunu Satriyo Waskito, ST Jatmico Setiawan, ST
Ahli Arsitektur Site Manager
BACK UP DATA
PEKERJAAN FINISHING LUAR BANGUNAN

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : 03 Agustus 2021
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Jumlah Panjang Lebar Luas Volume


NO URAIAN PEKERJAAN Keterangan
Titik M' M' M² M²
Pek. Pengadaan dan Pemasangan ACP Panel PVDF tebal 4 mm
2 I II III IV V = I x IV VI
aluminium skin 0.3 mm tkdn 61% Cutting Logo dan Ornamen
a Cutting logo depan belakang 2 39.7 79.40
b Cutting leher biru depan belakang 2 73.3 146.60
Sub Jumlah 226.00

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING PT. PANCA MANDIRI ENGINEERING

SUNU SATRIYO WASKITO, S.T. FADLI GUNAWAN, S.T.


Ahli Arsitektur MK Administrator
BACK UP DATA
PEKERJAAN ATAP DAN STRUKTUR RANGKA BAJA

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : 03 Agustus 2021
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Jenis Jumlah Panjang Berat Jenis Volume


NO URAIAN PEKERJAAN Keterangan
Baja Profil Unit M' kg kg
Fabrikasi dan pemasangan struktur
kolom rangka baja dan atap WF
1 I II III IV V = II x III x IV VI
termasuk z. Posisi : Area Atap Gedung
Utama (Area Tengah)
a Kuda-kuda baja WF350.175.6.9 4 22.828 41.400 3780.317 Daerah Tengah
b Kuda-kuda baja WF350.175.6.9 2 26.028 41.400 2155.118 Daerah Pinggir
c Kuda-kuda baja WF300.150.5,5.8 1 25.228 32.000 807.296 Daerah Tengah
d Base plate Untuk Plat Sambungan 44 0.005 7850.000 1692.460 Fix
e Gording C200.50.50.4,5 20 39.000 10.100 7878.000
f Plat Talang Air Hujan Plat Talang Air Hujan 2 39.000 20.410 1591.980 Daerah Pinggir
g Sagrot Batang Tarik Փ 10 mm 234 1.200 0.617 173.113
h Besi siku Penahan Gording Besi siku 50.50.5 120 0.175 3.770 79.170
Sub Jumlah 18157.454

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. TUJUH JAYA KONSULTAN, KSO PT. Cipta Adhi Guna
PT. PANCA MANDIRI ENGINEERING

DWI JOKO SUPRAYITNO, S.T. Arismanto, ST


Ahli Struktur / Sipil Pelaksana
BACKUP DATA
PERSIAPAN PEKERJAAN SMK3

Pekerjaan : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


No. Kontrak : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
Tgl. Kontrak : 03 Agustus 2021
Lokasi : PEKANBARU
T.A : 2021

KONTRAK ADDENDUM
No. URAIAN SAT
HARGA SATUAN HARGA
VOL JUMLAH HARGA (Rp) BOBOT (%) VOL JUMLAH HARGA (Rp) BOBOT (%)
(Rp) SATUAN (Rp)
I. Penyiapan RK3K terdiri atas : 2,000,000.000 0.015 2,000,000.000 0.015

a. Pembuatan Manual Prossedur Instruksi Kerja, Ijin Kerja Set 1.000 2,000,000.000 2,000,000.000 0.015 1.000 2,000,000.000 2,000,000.000 0.015181582528

b. Pembuatan Kartu Identitas Pekerja (KIP) Lb - -

2 Sosialisasi dan Promosi K3 terdiri atas : 11,500,000.000 0.087 11,500,000.000 0.087


a. Induksi K3 (Safety Induction) Org
b. Pengarahan K3 (Safety Briefing)
Pertemuan Keselamatan (Safety Talk dan/atau Tool Box meeting) Org 50.000 50,000.000 2,500,000.000 0.019 50.000 50,000.000 2,500,000.000 0.019
c. Pelatihan K3 Org 2.000 1,500,000.000 3,000,000.000 0.023 2.000 1,500,000.000 3,000,000.000 0.023
d. Simulasi K3 Org 50.000 50,000.000 2,500,000.000 0.019 50.000 50,000.000 2,500,000.000 0.019
e. Spanduk (Banner) Lb 5.000 50,000.000 250,000.000 0.002 5.000 50,000.000 250,000.000 0.002
f. Poster Lb 5.000 50,000.000 250,000.000 0.002 5.000 50,000.000 250,000.000 0.002
g. Papan Informasi Bh 2.000 1,500,000.000 3,000,000.000 0.023 2.000 1,500,000.000 3,000,000.000 0.023

3 Alat Pelindung Kerja terdiri atas : 52,000,000.000 0.395 52,000,000.000 0.395


Kapasitas = {EI-716 x Mb} (EI-731) Kg Kg
a. Jaring Pengaman (Safety Net) Ls 2.000 10,000,000.000 20,000,000.000 0.152 2.000 10,000,000.000 20,000,000.000 0.152
Waktu siklus - - - -
b. Tali Keselamatan (Life Line) Ls 1.000 2,000,000.000 2,000,000.000 0.015 1.000 2,000,000.000 2,000,000.000 0.015
- Waktu pengeboran dan pembuangan galian
c. Penahan Jatuh (Safety Deck) Ls 1.000 10,000,000.000 10,000,000.000 0.076 1.000 10,000,000.000 10,000,000.000 0.076
d. Pagar Pengaman (Guard Railling) Ls 1.000 10,000,000.000 10,000,000.000 0.076 1.000 10,000,000.000 10,000,000.000 0.076
e. Pembatas Area (Restricted Area) Ls 1.000 10,000,000.000 10,000,000.000 0.076 1.000 10,000,000.000 10,000,000.000 0.076
- Waktu lain-lain
T1 15.000 menit 15.000 menit
T2 45.000 menit 45.000 menit
Koefisien Alat / m' T6 15.000 menit 15.000 menit

4 Alat pelindung Diri terdiri atas : 4,875,000.000 0.037 17,295,000.000 0.129


a. Topi Pelindung (Safety Helmet) Bh 35.000 60,000.000 2,100,000.000 0.016 85.000 60,000.000 5,100,000.000 0.039
b. Pelindung Mata (Goggles Spectacles) Psg 10.000 50,000.000 500,000.000 0.004 10.000 50,000.000 500,000.000 0.004
c. Tameng muka (Face Shield) Bh 10.000 35,000.000 350,000.000 0.003 10.000 35,000.000 350,000.000 0.003
d. Masker Selam (Breathing Apparatus) Bh 25,000.000 - - 25,000.000 - -
e. Pelindung Telinga ( Ear plug, Ear Muff) Psg 40,000.000 - - 40,000.000 - -
f. Pelindung Pernafasan dan Mulut (Masker) Bh 3,000.000 - - 3,000.000 - -
g. Sarung Tangan (Safety Gloves) Psg 35.000 5,000.000 175,000.000 0.001 85.000 5,000.000 425,000.000 0.003
h. Sepatu Keselamatan (Safety shoes) Psg 35.000 25,000.000 875,000.000 0.007 85.000 25,000.000 2,125,000.000 0.016
i. Penunjang Seluruh Tubuh (Full Body Harness) Bh - - - 20.000 318,500.000 6,370,000.000 0.048
j. Jaket Pelampung (Live Vest) Bh - - - - - -
k. Rompi Keselamatan (Safety Vest) Bh 35.000 25,000.000 875,000.000 0.007 85.000 25,000.000 2,125,000.000 0.016
l. Celemek (Apron/Coveralls) Bh - - - -
m. Pelindung Jatuh (Fall Arrestter) Bh - - - -
n Masker Kotak 2.000 150,000.000 300,000.000 0.002

5 Asuransi Dan Perijinan terdiri atas : 50,000,000.000 0.380 50,000,000.000 0.380


a. BPJS Ketenagakerjaan Dan Kesehatan Kerja Ls 1.000 50,000,000.000 50,000,000.000 0.380 1.000 50,000,000.000 50,000,000.000 0.380
b. Surat Ijin Kelayakan Alat Alat/Kend - - - -
c. Surat Ijin Operator Lb/Alat - - - -
d. Surat Ijin Pengesahan Panitia Pembina Keselamatan Ls
dan Kesehatan Kerja (P2K3)

6 Personil K3 terdiri dari : 20,000,000.000 0.152 20,000,000.000 0.152


a. Ahli K3 Bln - - - - - - - -
b. Petugas K3/P3K Bln 5.000 4,000,000.000 20,000,000.000 0.152 5.000 4,000,000.000 20,000,000.000 0.152
c. Petugas Tanggap Darurat Bln - - - - - - - -
d. Petugas P3K Bln - - - - - - - -
e. Petugas Pengatur Lalu Lintas (Flagman) Bln - - - - - - - -
f. Petugas Medis Bln - - - - - - - -

7 Fasilitas Sarana Kesehatan : 26,100,000.000 0.198 26,100,000.000 0.198


a. Peralatan P3K (Kotak P3K, Tandu, Tabung oksigen, Obat) Ls 1.000 10,000,000.000 10,000,000.000 0.076 1.000 10,000,000.000 10,000,000.000 0.076
b. Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Ls 1.000 15,000,000.000 15,000,000.000 0.114 1.000 15,000,000.000 15,000,000.000 0.114
c. Peralatan Pengasapan (foggging) Bh 1.000 1,000,000.000 1,000,000.000 0.008 1.000 1,000,000.000 1,000,000.000 0.008
d. Obat Pengasapan Ls 1.000 100,000.000 100,000.000 0.001 1.000 100,000.000 100,000.000 0.001

8 Rambu - Rambu terdiri atas : 2,175,000.000 0.017 2,175,000.000 0.017


a. Rambu Petunjuk Bh 10.000 25,000.000 250,000.000 0.002 10.000 25,000.000 250,000.000 0.002
b. Rambu Larangan Bh 5.000 25,000.000 125,000.000 0.001 5.000 25,000.000 125,000.000 0.001
c. Rambu Peringatan Bh 10.000 25,000.000 250,000.000 0.002 10.000 25,000.000 250,000.000 0.002
d. Rambu Kewajiban Bh 5.000 25,000.000 125,000.000 0.001 5.000 25,000.000 125,000.000 0.001
e. Rambu informasi Bh 5.000 25,000.000 125,000.000 0.001 5.000 25,000.000 125,000.000 0.001
f. Rambu Pekerjaan Sementara Bh 10.000 25,000.000 250,000.000 0.002 10.000 25,000.000 250,000.000 0.002
g. Tongkat Pengatur Lalu lintas (Warning Light Sticks) Bh 2.000 75,000.000 150,000.000 0.001 2.000 75,000.000 150,000.000 0.001
h. Kerucut Lalu Lintas Bh 10.000 55,000.000 550,000.000 0.004 10.000 55,000.000 550,000.000 0.004
i. Lampu Putar (Rotary Lamp) Bh 2.000 125,000.000 250,000.000 0.002 2.000 125,000.000 250,000.000 0.002
j. Lampu Selang Lalu Lintas Ls 1.000 100,000.000 100,000.000 0.001 1.000 100,000.000 100,000.000 0.001

9 Lain - lain Terkait Pengendalian Resiko K3 31,800,000.000 0.241 31,800,000.000 0.241


a. Alat Pemadam Api Ringan (APAR) - 5 kg Bh 3.000 3,500,000.000 10,500,000.000 0.080 3.000 3,500,000.000 10,500,000.000 0.080
b. Sirine Bh 2.000 250,000.000 500,000.000 0.004 2.000 250,000.000 500,000.000 0.004
c. Bendera K3 Bh 3.000 100,000.000 300,000.000 0.002 3.000 100,000.000 300,000.000 0.002
d. Jalur Evakuasi (Escape Route) Ls 2.000 5,000,000.000 10,000,000.000 0.076 2.000 5,000,000.000 10,000,000.000 0.076
e. Lampu Darurat (Emergency Lamp) Bh 4.000 125,000.000 500,000.000 0.004 4.000 125,000.000 500,000.000 0.004
f. Program Inspeksi dan Audit Internal Ls 1.000 5,000,000.000 5,000,000.000 0.038 1.000 5,000,000.000 5,000,000.000 0.038
g. Pelaporan dan Penyelidikan Insiden Ls 1.000 5,000,000.000 5,000,000.000 0.038 1.000 5,000,000.000 5,000,000.000 0.038
TOTAL BIAYA KESELAMATAN DAN KESEHATAN KERJA 200,450,000.00 1.52 212,870,000.00 1.614
BACK UP DATA
PEKERJAAN PEMBERSIHAN LAHAN

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : 03 Agustus 2021
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

29000

Pembatas Bongkaran
Paving Block Existing

6100
C Sisi Luar Bangunan
Gedung Rencana

24100
B

11750
A

40400

76600

ANALISA PERHITUNGAN

Panjang Lebar Volume


NO URAIAN PEKERJAAN Keterangan
M² M² M²
2 Pek. Pembersihan Lahan I II III = I x II IV
Selasar Depan (Entrance) 40.40 11.75 474.700 A
G.Utama 76.60 24.10 1846.060 B
Selasar Belakang 29.00 6.10 176.900 C
Sub Jumlah 2497.660

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING PT. PANCA MANDIRI ENGINEERING

DWI JOKO SUPRAYITNO, S.T. FADLI GUNAWAN, S.T.


Ahli Struktur / Sipil MK Administrator
BACK UP DATA
PEKERJAAN ANTI RAYAP TERMISIDA

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : 03 Agustus 2021
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Jumlah Tinggi Panjang Lebar Luas Dinding Galian Luas Lantai Galian Volume
NO URAIAN PEKERJAAN
Titik M' M' M' M² M² M²
5 Pek. Anti rayap termisida di pile cap I II III IV V = I x (II x III)+(II x IV) x 2 VI = I x III x IV VII = V + VI
a Tipe F1.K/1 29 0.85 1.40 1.40 138.04 56.84 194.880
b Tipe F2.K/2 2 0.85 1.20 1.70 9.86 4.08 13.940
c Tipe F4/4 24 0.85 1.70 1.70 138.72 69.36 208.080
d Tipe F6/6 16 0.85 1.70 2.45 112.88 66.64 179.520
e Tipe F1/1 10 0.85 0.95 0.95 32.3 9.025 41.325
f Tipe F2/2 8 0.85 1.40 1.70 42.16 19.04 61.200
Total 89 698.945
Jumlah Panjang Lebar Volume
NO URAIAN PEKERJAAN
Titik M' M' M²
5 Pek. Anti rayap termisida di plat lantai 1 (wiremesh) I II III IV = I x II x III
a Lantai Bangunan Utama 1 72.00 19.50 1404.000
b Lantai Selasar Depan 10 6.00 6.00 360.000
c Lantai Selasar Belakang 4 6.55 6.00 157.200
Total 1921.200
Jumlah Panjang Lebar Luas
NO URAIAN PEKERJAAN
Titik M' M' M²
5 Pengurangan Luas Penampang Kolom Pedestal I II III IV = I x II x III
a Tipe F1.K/1 29 1.20 1.20 41.760
b Tipe F2.K/2 2 1.00 1.50 3.000
c Tipe F4/4 24 1.50 1.50 54.000
d Tipe F6/6 16 1.50 2.25 54.000
e Tipe F1/1 10 0.75 0.75 5.625
f Tipe F2/2 8 1.20 1.50 14.400
Total 71 172.785
Sub Jumlah Vol. Anti rayap total (1+2-3) 2447.360

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING PT. PANCA MANDIRI ENGINEERING

DWI JOKO SUPRAYITNO, S.T. FADLI GUNAWAN, S.T.


Ahli Struktur / Sipil MK Administrator
BACK UP DATA
Beton Sloof BS 60x80
PEKERJAAN BETON SLOOF (PEMBESIAN φ10)

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : 03 Agustus 2021
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Jumlah Panjang Banyak Beugel Berat Jenis Volume


NO URAIAN PEKERJAAN Keterangan
Baris M' batang kg kg
d3 Pek. Pembesian φ10 I II III IV V = II x III x IV VI
BS 60/80 (Vertikal) - 2.52 64 0.62 99.43
3 BS 60/80 (Horizontal) - 0 0 0.00 0.00
BS 60/80 (Flyer) - 0.84 164 0.62 84.93
Sub Jumlah 184.358

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING PT. PANCA MANDIRI ENGINEERING

DWI JOKO SUPRAYITNO, S.T. FADLI GUNAWAN, S.T.


Ahli Struktur / Sipil MK Administrator
BACK UP DATA
Kolom 80x80 cm
PEKERJAAN BETON STRUKTUR ATAS (COR BETON K-300 KOLOM ELEVASI +4.50 ke +12.50) AULA

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : 03 Agustus 2021
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Jumlah Tinggi Panjang Lebar Volume


NO URAIAN PEKERJAAN
Titik M' M' M' M3
d Pek. Beton K-300 Kolom +4.50 ke +11.50 dan +12.50 I II III IV V = I x II x III x IV
K80/80 Kolom Dalam (Aula) 4 7.00 0.80 0.80 17.920
2
K80/80 Kolom Luar (Aula) 12 8.00 0.80 0.80 61.440
Sub Jumlah 79.360

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Manajemen Konstruk
PT. TUJUH JAYA KONSULTAN, KSO PT. TUJUH JAYA KONSU
PT. PANCA MANDIRI ENGINEERING PT. PANCA MANDIRI EN

DWI JOKO SUPRAYITNO, S.T. FADLI GUNAWAN,


Ahli Struktur / Sipil MK Administrator
BACK UP DATA
Kolom 80x80 cm
R ATAS (COR BETON K-300 KOLOM ELEVASI +4.50 ke +12.50) AULA

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Keterangan

VI
Grid G,I | 5+,5-
Grid E,F,G,I,J,K | 7,3A

Dibuat Oleh :
Manajemen Konstruksi (MK)
PT. TUJUH JAYA KONSULTAN, KSO
PT. PANCA MANDIRI ENGINEERING

FADLI GUNAWAN, S.T.


Administrator
BACK UP DATA
PEKERJAAN BETON STRUKTUR ATAS (BAJA IWF 300.150.5,5.8 Depan Elevasi +4.50)

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : ###
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Jenis Jumlah Panjang Berat Jenis Volume


NO URAIAN PEKERJAAN Keterangan
Baja Profil Unit M' kg kg
Fabrikasi dan pemasangan struktur
3b I II III IV V = II x III x IV VI
Baja IWF 300.150.5,5.8 Depan +4.50
WF300.150.5,5.8 2 12.000 32.000 768.000
WF300.150.5,5.8 2 6.000 32.000 384.000
WF300.150.5,5.8 4 7.500 32.000 960.000
3
Hollow T 100.50.3,2 7 5.750 7.010 282.153 Balok Bagi/anak
Hollow T 100.50.3,2 4 6.000 7.010 168.240 Balok Bagi/anak
Hollow T 100.50.3,2 4 4.500 7.010 126.180 Balok Bagi/anak
Jumlah
Fabrikasi dan pemasangan struktur Jenis Baja Profil Vol (M 3)
B. Jenis (kg) Volume (kg) Keterangan
3b (Unit)
Baja IWF 300.150.5,5.8 Depan +4.50 I II III IV V = II x III x IV VI
Untuk Plat Sambungan 14 0.005 7850.000 538.510
3
Untuk Plat Sambungan 14 0.002 7850.000 175.840
Sub Jumlah 3402.923

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana

PT. TUJUH JAYA KONSULTAN, KSO PT. Cipta Adhi Guna


PT. PANCA MANDIRI ENGINEERING

DWI JOKO SUPRAYITNO, S.T. Arismanto, ST


Ahli Struktur / Sipil Pelaksana
BACK UP DATA
PEKERJAAN BETON STRUKTUR ATAS (BAJA IWF 300.150.5,5.8 Belakang Elevasi +4.50)

PEKERJAAN : PEKERJAAN FISIK PEMBANGUNAN QUR'AN CENTRE


NO. KONTRAK : 645.8/PUPRPKPP-CK/KONTRAK-FSK.QURAN CENTRE/VIII/2021/05
TGL. KONTRAK : 03 Agustus 2021
LOKASI : PEKANBARU
T.A : 2021

SKETSA PEKERJAAN

ANALISA PERHITUNGAN

Jenis Jumlah Panjang Berat Jenis Volume


NO URAIAN PEKERJAAN Keterangan
Baja Profil Unit M' kg kg
Fabrikasi dan pemasangan struktur
3c I II III IV V = II x III x IV VI
Baja IWF 300.150.5,5.8 Belakang +4.50
WF300.150.5,5.8 2 12.000 32.000 768.000
WF300.150.5,5.8 2 6.500 32.000 416.000
WF300.150.5,5.8 4 7.500 32.000 960.000
3
Hollow T 100.50.3,2 7 6.250 7.010 306.688 Balok Bagi/anak
Hollow T 100.50.3,2 4 6.000 7.010 168.240 Balok Bagi/anak
Hollow T 100.50.3,2 4 4.500 7.010 126.180 Balok Bagi/anak
Fabrikasi dan pemasangan struktur Jenis Baja Profil Jumlah (Unit) Vol (M3) B. Jenis (kg) Volume (kg) Keterangan
3c
Baja IWF 300.150.5,5.8 Belakang +4.50 I II III IV V = II x III x IV VI
Untuk Plat Sambungan 14 0.005 7850.000 538.510
3
Untuk Plat Sambungan 14 0.002 7850.000 175.840
Sub Jumlah 3459.458

Diperiksa Oleh : Dibuat Oleh :


Manajemen Konstruksi (MK) Kontraktor Pelaksana
PT. TUJUH JAYA KONSULTAN, KSO PT. Cipta Adhi Guna
PT. PANCA MANDIRI ENGINEERING

DWI JOKO SUPRAYITNO, S.T. Arismanto, ST


Ahli Struktur / Sipil Pelaksana
III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING
AW 1 Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I
Posisi : Dibawah Curtain Wall

no keterangan
1 gedung utama
2 gedung samping

AW 3 Pek. Curtain Wall type 1 - T = 12.50 m


Posisi : area hall dll

no keterangan
1 gedung utama
2 pintu depan belakang dan samping ( pengurangan curtain wall)

AW 4 Pek. Curtain Wall type 2 - T = 9.50 m


Posisi : area kelas dll

no keterangan
2 gedung samping

AW 2
Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 lengkap nok dan a

no keterangan panjang lebar


1 atap 18.64 38.75

AW 1
Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium skin 0.3
a. Posisi : Tampak Luar Bangunan pada kolom dan balok silang
no keterangan panjang tinggi
1 kolom luar cafe tinggi 11m (sekeliling) 3.2 11
2 kolom bangunan tengah bentuk C tinggi +11.5 1.6 11.5
3 kolom bangunan tengah bentuk C diatas elv +8.5 1.6 6.1
4 kolom bangunan tengah bentuk L 2.4 11.5
5 kolom bangunan tengah bentuk pesegi 80x80 mulai elv. 11,5- elv 3.2 2.7
6 kolom bangunan tengah bentuk pesegi 80x80 mulai elv. 11,5- elv 3.2 3.1
7 kolom kelas C 1.6 8.5
8 kolom kelas L 2.4 8.5
9 kolom bangunan kelas bentuk pesegi 80x80 mulai elv. +8,5- elv 3.2 1
10 x bawah depan belakang
keterangan
- surface depan dan belakang (2 sisi) 33.59 luas
- surface samping (4 sisi - atas, bawah, kiri, kanan) 113.87 keliling

b. Posisi : leher atap dan background logo


no keterangan panjang tinggi
v atas leher atap posisi depan dan belakang
1
- surface depan dan belakang (2 sisi) 26.64 luas
- surface samping (4 sisi - atas, bawah, kiri, kanan) 46.04 keliling
2 lis logo posisi depan dan belakakng
- surface depan dan belakang (2 sisi) 16.91 luas
- surface samping (4 sisi - atas, bawah, kiri, kanan) 56.36 keliling
3 Background logo (warna kuning)
- surface depan dan belakang 39.7 luas

c. Posisi : Keliling sisi samping atap


no keterangan panjang tinggi
1 lisplank acp samping tinggi 21.04 0.6

d. Posisi : Plafond Atap


no keterangan panjang lebar
1 atap 18.64 38.75
2 pengurang dinding tengah 18.64 11.3
3 pengurang kolom 24 0.36

AW 2 Pek. Pengadaan dan Pemasangan Aluminium Composit Panel PVDF tebal 4 mm aluminium skin 0.3
cutting Logo dan Ornamen
no keterangan luas jumlah
1 cutting logo depan belakang 39.7 2
2 cutting leher biru depan belakang 73.3 2

AW 1 pekerjaan canopi depan ACP


no keterangan panjang tinggi
v depan acp
1
- surface depan dan belakang 16.67 luas
- surface samping 57.42 keliling
2 acp surface balok atas 3 buah
- surface depan dan belakang 0 luas
- surface samping 2 keliling
3 acp atap posisi ukiran tebal 50cm
rangka dan acp atap 29.37 luas
surface samping 21.93 keliling
4 cutting ukuran depan belakang 4 unit
- cutting ukiran 16.74 luas

Pek. Curtain Wall untuk sky light canopi depan


no keterangan
1 atap canopi skylight

2 pekerjaan canopi belakang ACP


no keterangan panjang tinggi
v belakang acp
1
- surface depan dan belakang 16.67 luas
- surface samping 57.42 keliling
2 acp surface balok atas 3 buah
- surface depan dan belakang 0 luas
- surface samping 2 keliling
3 acp atap posisi ukiran tebal 50cm
rangka dan acp atap 37.27 luas
surface samping 24.43 keliling
4 cutting ukuran depan belakang 4 unit
- cutting ukiran 16.74 luas

Pek. Curtain Wall untuk sky light canopi depan


no keterangan
1 atap canopi skylight

AW 2
Pek. Penutup Atap Klip lock 406 tebal 0,45mm Colourbond XRW AZ 150 G550 lengkap nok dan a
III.2.3 2

no keterangan panjang lebar


1 atap 18.64 25.5

acp Keliling sisi samping atap gedung kelas


no keterangan panjang tinggi
1 lisplank acp samping tinggi 21.04 0.6
2 lis depan belakang bentuk L 1.35 25.5
3 plafon acp 18.6 25.5

acp Keliling sisi samping atap cafe


no keterangan panjang tinggi
1 acp atap 17.19 1
2 lis depan belakang bentuk L 1.35 12
3 plafon acp cafe 18.7 12

acp kolom v depan dan belakang


no keterangan surface 1 2 unit
1 acp V 17.293 2
2 acp ukiran cafe 7.0755 2
3 acp ukiran kelas 17.6334 2

III.1.1 PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pek. Pemasangan Lantai Homogenious Tile 60x60 cm Polish Type I
Posisi : gedung cafe dan carport belakakng

no keterangan panjang lebar


1 gedung cafe 12.859 18.859
2 carport belakang 6.95 24.4
3 carport depan unpolish 360

REKAPITULASI BERAT KUDA KUDA BAJA ELEVASI


AW No Jenis Baja Profil Satuan Berat/m

1 WF350.175.6.9 kg 41.40
WF350.175.6.9 kg 41.40
Untuk Plat Sambungan Kg

2 C200.50.50.4,5 kg 10.10
3 Plat Talang Air Hujan kg 20.41

4 Sagrot (Batang Tarik Փ 10 mm) kg 0.62


5 Besi siku Penahan Gording kg 3.77

REKAPITULASI BERAT BAJA ENTRANCE ELEVASI + 4,5


No Jenis Baja Profil Satuan Berat/m

1 WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
Untuk Plat Sambungan Kg

2 Hollow T 100.50.3,2 Kg 7.01


Hollow T 100.50.3,2 Kg 7.01
Hollow T 100.50.3,2 Kg 7.01
Untuk Plat Sambungan Kg

REKAPITULASI BERAT BAJA ENTRANCE ELEVASI + 4,5 M


No Jenis Baja Profil Satuan Berat/m

1 WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
WF300.150.5,5.8 kg 32.00
Untuk Plat Sambungan Kg

2 Hollow T 100.50.3,2 Kg 7.01


Hollow T 100.50.3,2 Kg 7.01
Hollow T 100.50.3,2 Kg 7.01
Untuk Plat Sambungan Kg

REKAPITULASI BERAT KUDA KUDA BAJA ELEVASI


No Jenis Baja Profil Satuan Berat/m

1 WF350.175.6.9 kg 41.40
WF350.175.6.9 kg 41.40
Untuk Plat Sambungan Kg

2 C200.50.50.4,5 Kg 10.10
3 Plat Talang Air Hujan Kg 20.41

4 Sagrot (Batang Tarik Փ 10 mm) Unit

REKAPITULASI BERAT BAJA KANTILEVER ELEVASI


No Jenis Baja Profil Satuan Berat/m

1 Hollow T 100.50.3,2 Kg 7.01


Untuk Plat Sambungan Kg

2 Plat Talang Air Hujan Kg 20.41


hitungan mc nol sisa volume
m2 80.86 160.00 79.14

volume
48.672
32.184
total hitungan 80.856

hitungan mc nol sisa volume


m2 1064.10 1125.85 61.75

volume
1074
-9.9 2.2 m tinggi
total 1064.1 0.9 m lebar 1 pintu
hitungan mc nol sisa volume
m2 509.58 622.20 112.62

volume
509.58

hitungan mc nol sisa volume


m2 722.3 789.48 67.18
550 lengkap nok dan aksesoris

volume
722.3

mm aluminium skin 0.3 mm tkdn 61%


hitungan mc nol sisa volume
m2 1189.49 965.64 -223.85
jumlah volume
8 281.60
10 184
2 19.52
4 110.4
14 120.96
2 19.84
6 81.6
2 40.8
8 25.6

tebal depan belakang


2 2 134.36
0.75 2 170.805

total 1189.49
hitungan mc nol sisa volume
m2 407.20 761.00 353.80
jumlah volume
tebal depan belakang
2 2 106.56
0.75 2 69.06

2 2 67.64
0.75 2 84.54

2 79.40
total 407.20

hitungan mc nol sisa volume


m2 25.25 118.80 93.55
jumlah volume
2 25.248

hitungan mc nol sisa volume


m2 503.03 558.90 55.87
volume
722.30
-210.632
-8.64
total 503.03

mm aluminium skin 0.3 mm tkdn 61% hitungan mc nol sisa volume


m2 226.00 241.00 15.00
volume
79.40
146.6
total 226.00

hitungan mc nol sisa volume


m2 336.00 0.00 -336.00
jumlah volume
tebal depan belakang
1 2 33.34
0.75 1 43.065

0 0 0.00
4.5 5 45.00

1 2 58.74
0.5 2 21.93

4 2 133.92
total 335.995

hitungan mc nol sisa volume


m2 63.43 0.00 -63.43
volume
63.43

hitungan mc nol sisa volume


m2 359.80 0.00 -359.80
jumlah volume
tebal depan belakang
1 2 33.34
0.75 1 43.065

0 0 0.00
5.05 5 50.50

1 2 74.54
0.5 2 24.43

4 2 133.92
total 359.80

hitungan mc nol sisa volume


m2 78.98 0.00 -78.98
volume
78.98

hitungan mc nol sisa volume


m2 475.32 -475.32
550 lengkap nok dan aksesoris

volume
475.32

hitungan mc nol sisa volume


m2 555.77 0.00 -555.77
jumlah volume
1 12.62
2 68.85
1 474.3
total 555.77

hitungan mc nol sisa volume


m2 291.18 0.00 -291.18
jumlah volume
2 34.38
2 32.4
224.4
total 291.18

hitungan mc nol sisa volume


m2 990.95 0.00 -990.95
jumlah volume
16 553.38
6 84.91
10 352.67
total 990.95

hitungan mc nol sisa volume


m2 412.09 0.00 -412.09

volume
242.51
169.58

total hitungan 412.090

DA BAJA ELEVASI + 12,5 M


Panjang Jumlah Unit Total Berat Keterangan

23.97 4.00 3,969.10 Daerah Tengah


27.93 2.00 2,312.44 Daerah Pinggir
1,461.67 Masih Estimasi

39.00 20.00 7,878.00 Gording


39.00 2.00 1,591.98

1.20 234.00 173.11


0.175 120.00 79.17 Besi siku 50.50.5
TOTAL 17,465.47
NCE ELEVASI + 4,5 M DEPAN
Panjang Jumlah Unit Total Berat Keterangan

12.00 2.00 768.00


6.00 2.00 384.00
7.50 4.00 960.00
538.51 Masih Estimasi

5.75 7.00 282.15 Balok Bagi/anak


6.00 4.00 168.24 Balok Bagi/anak
4.50 4.00 126.18 Balok Bagi/anak
175.84 Masih Estimasi

3,402.92

CE ELEVASI + 4,5 M BELAKANG


Panjang Jumlah Unit Total Berat Keterangan

12.00 2.00 768.00


6.50 2.00 416.00
7.50 4.00 960.00
538.51 Masih Estimasi

6.25 7.00 306.69 Balok Bagi/anak


6.00 4.00 168.24 Balok Bagi/anak
4.50 4.00 126.18 Balok Bagi/anak
175.84 Masih Estimasi

3,459.458

DA BAJA ELEVASI + 8,5 M


Panjang Jumlah Unit Total Berat Keterangan

23.03 3.00 2,860.08 Daerah Tengah


26.03 1.00 1,077.56 Daerah Pinggir
807.77 Masih Estimasi

27.00 20.00 5,454.00 Gording


27.00 2.00 1,102.14
11,301.54
1.20 162.00

TILEVER ELEVASI + 11,0 M


Panjang Jumlah Unit Total Berat Keterangan

5.53 2.00 77.53


100.48 Masih Estimasi

18.30 2.00 747.01


925.02
harga satuan sisa dana A=
375,340.00 29,705,908.96 B=
C=

Sambungan 40D
0.32

Tanah Timbun Ramp (Tanjakan Kendaraan)


Timbunan dibawah plat Ramp
harga satuan sisa dana Depan
840,005.00 51,870,308.75
P. Sunu Plat Wiremesh Ramp (Tanjakan Kendaraan)
Plat Wiremesh
Depan

Beton K-300 Ramp (Tanjakan Kendaraan)


Beton K-300
harga satuan sisa dana Depan
840,005.00 94,601,363.10
Bata Ramp (Tanjakan Kendaraan)
Pas. 1/2 Bata Cansteen
Depan

Plesteran Ramp (Tanjakan Kendaraan)


Plesteran 1:4
harga satuan sisa dana Depan
207,144.00 13,915,933.92
Besi Ramp (Tanjakan Kendaraan)
Besi Siku 40.40.4
Depan

FGR Plat Wiremesh Ramp (Tanjakan Kendaraan)


Depan
Plat Lantai
harga satuan sisa dana
595,180.00 (133,228,067.10)
harga satuan sisa dana
595,180.00 210,574,684.00

harga satuan sisa dana


595,180.00 55,680,279.36

harga satuan sisa dana


595,180.00 33,253,896.96

harga satuan sisa dana


595,180.00 8,927,700.00
total sisa dana 365,302,007.95

harga satuan sisa dana


595,180.00 (199,977,504.10)

harga satuan sisa dana


840,005.00 (53,281,517.15)

harga satuan sisa dana


595,180.00 (214,142,788.10)
harga satuan sisa dana
840,005.00 (66,343,594.90)

harga satuan sisa dana


207,144.00 (98,459,686.08)

harga satuan sisa dana


595,180.00 (330,785,569.32)

harga satuan sisa dana


595,180.00 (173,304,512.40)

harga satuan sisa dana


595,180.00 (589,793,621.00)
harga satuan sisa dana
375,340.00 (154,673,815.93)
5
No.
12 A.
1
12.041594579

Kait 6D B.
0.048

Jumlah Panjang Lebar Tinggi Volume


24 5.3 0.88 0.5 55.968

Jumlah Panjang Lebar Volume C.


2 12.60 5.40 136.080 D.
E.

Jumlah Panjang Lebar Tinggi Volume


2 12.60 5.40 1.00 68.040

Jumlah Panjang Lebar Volume


4 12.04 0.30 14.448

Jumlah Panjang Lebar Volume


4 12.04 0.30 14.448

Jumlah Panjang Lebar Volume


48 5.30 2.42 615.648

Jumlah Panjang Lebar Volume


2 12.04 6.00 144.499
Pek. Pengadaan dan pemasangan ACP PVDF 4 mm alumunium skin 0.3 mm tkdn 61% + rangka
Uraian
TENAGA
Upah pemasangan

JUM
BAHAN
Brazing
Sealant
Sekrup
Bracket ACP
ACP PVDF 4 mm alumunium skin 0.3 mm tkdn 61% +
sewa scaffolding
JUM
Jumlah (A + B)
Overhead & Profit
HARGA SATUAN PEKERJAAN (C + D)
PEMBULATAN
Satuan Koefisien Harga Satuan Jumlah Harga

m² 1.000 Rp 128,284.39 Rp 128,284.39

JUMLAH TENAGA KERJA Rp 128,284.39

buah 23.000 Rp 2,574.51 Rp 59,213.73


tabung 0.060 Rp 62,523.93 Rp 3,751.44
buah 45.000 Rp 2,206.73 Rp 99,302.85
buah 20.000 Rp 1,471.15 Rp 29,423.00
m² 1.050 Rp 227,072.20 Rp 238,425.81
Ls 1.000 Rp 36,778.78 Rp 36,778.78
JUMLAH HARGA BAHAN Rp 466,895.61
Rp 595,180.00
0% Rp 595,180.00 Rp -
Rp 595,180.00
Rp 595,180.00

Bobot Bahan ACP 40.059


65% ketentuan material on-site 26.039
Volume total ACP 2830.53655463571
Volume 26% ACP 737.033
ACP 240