II. PEKERJAAN SUMUR BOR 54.037 12.000 13.509 13.509 15.018 54.037
IV PEKERJAAN PASANGAN BATU BATA DAN PLESTERAN 4.123 1.374 1.374 1.374 4.123
TOTAL 100.00
PROGRES PEKERJAAN MINGGU-AN 13.304 26.163 29.512 31.021 100.00
KUMULATIF RENCANA PROGRES PEKERJAAN 13.304 39.467 68.979 100.0
DIBUAT OLEH :
CV. NARAMON FAJRI
M1
M2
M3
M4
M5
M6
M7
M8
M9
M10
M11
M12
M13
M14
M15
M16
M17
M18
M19
M20
M21
M22
M23
R DAN TOWER
3/SPK/Hanpangnak-UPTS/XI/2022
MINGGU KE = MINGGU I
PEKERJAAN : SUMUR BOR DAN TOWER
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00 335,000.00 Rp 335,000.00 0.198 0.000 1.00 0.198 1.00 0.198
2 Pembersihan Lahan Ls 1.00 940,000.00 Rp 940,000.00 0.555 0.000 0.50 0.277 0.50 0.277
3 Peralatan dan Perlengkapan K3 Ls 1.00 935,000.00 Rp 935,000.00 0.552 0.000 0.50 0.276 0.50 0.276
TOTAL I Rp 2,210,000.00 0.000 0.751 0.751
A Pekerjaan Pemboran -
1 Pengeboran Sumur Bor 100 Meter Lubang, Dia. 8 3/4" M' 70.00 164,500.00 Rp 11,515,000.00 6.795 0.000 70.00 6.795 70.00 6.795
2 Reaming Lubang Sumur Bor, Dia. 8 3/4"-12" M' 70.00 152,200.00 Rp 10,654,000.00 6.287 0.000 0.000 0.00 0.000
3 Pemasangan dan pembongkaran Temporary Casing 12" M' 70.00 200,800.00 Rp 14,056,000.00 8.295 0.000 0.000 0.00 0.000
1 Pemasangan cassing dasar pipa Galvanis 4" M' 24.00 394,000.00 Rp 9,456,000.00 5.580 0.000 0.000 0.00 0.000
2 Pemasangan cassing pipa PVC 3" M' 31.00 92,100.00 Rp 2,855,100.00 1.685 0.000 0.000 0.00 0.000
3 Pemasangan centralizer Bh 3.00 146,100.00 Rp 438,300.00 0.259 0.000 0.000 0.00 0.000
4 Pipa Hisap Galvanis Ø2" + Accesories M' 70.00 176,000.00 Rp 12,320,000.00 7.270 0.000 0.000 0.00 0.000
5 Cor BetonBox Penutup Sumur Titik 1.00 798,500.00 Rp 798,500.00 0.471 0.000 0.000 0.00 0.000
6 Pompa Otomat Submersible 3 HP Cassing 3" outlet 2" Unit 1.00 6,500,000.00 Rp 6,500,000.00 3.836 0.000 0.000 0.00 0.000
1 Galian Tanah M³ 6.00 102,100.00 Rp 612,600.00 0.361 0.000 6.00 0.361 6.00 0.361
2 Urugan Pasir M³ 0.60 203,100.00 Rp 121,860.00 0.072 0.000 0.60 0.072 0.60 0.072
3 Lantai Kerja Beton K 175 M³ 0.60 1,321,800.00 Rp 793,080.00 0.468 0.000 0.60 0.468 0.60 0.468
4 Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.20 1,403,400.00 Rp 1,684,080.00 0.994 0.000 0.000 0.00 0.000
5 Pekerjaan Pembesian Kg 53.43 19,500.00 Rp 1,041,885.00 0.615 0.000 0.000 0.00 0.000
6 Bekisting 2x Pakai M² 1.50 580,500.00 Rp 870,750.00 0.514 0.000 0.000 0.00 0.000
7 Pasangan dinding bata merah tebal 1/2 bata camp. 1pc : 4pp M² 17.00 157,000.00 Rp 2,669,000.00 1.575 0.000 0.000 0.00 0.000
8 Kolom Praktis Beton Bertulang 11 x 11 Cm M 6.00 150,000.00 Rp 900,000.00 0.531 0.000 0.000 0.00 0.000
9 Plesteran camp. 1pc : 4pp M² 23.00 93,600.00 Rp 2,152,800.00 1.270 0.000 0.000 0.00 0.000
10 Pintu Control Plat Besi 4 mm Lengkap Accecoris Ls 1.00 800,000.00 Rp 800,000.00 0.472 0.000 0.000 0.00 0.000
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
11 Stop Keran (Untuk Pembuangan dan Outlet Ke Roof Tank) Bh 2.00 12,100.00 Rp 24,200.00 0.014 0.000 0.000 0.00 0.000
12 Pipa (Outlet+Pembuangan) M' 16.00 55,700.00 Rp 891,200.00 0.526 0.000 0.000 0.00 0.000
13 Keramik 40 x40 mm M² 29.00 359,200.00 Rp 10,416,800.00 6.147 0.000 0.000 0.00 0.000
TOTAL II Rp 91,571,155.00 0.000 7.696 7.696
1 Galian Tanah Pondasi M³ 2.56 102,100.00 Rp 261,376.00 0.154 0.000 2.56 0.154 2.56 0.154
2 Mengurug kembali bekas galian M³ 0.85 74,300.00 Rp 63,155.00 0.037 0.000 0.000 0.00 0.000
B Pekerjaan Pondasi -
1 Urugan Pasir, tebal 10 cm M³ 0.39 203,100.00 Rp 79,209.00 0.047 0.000 0.39 0.047 0.39 0.047
2 Cor Lantai Kerja Pondasi f'c 7,4 Mpa, tebal 7 cm M³ 0.39 1,193,600.00 Rp 465,504.00 0.275 0.000 0.39 0.275 0.39 0.275
Pembesian Ulir D13 Kg 203.38 20,100.00 Rp 4,087,938.00 2.412 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.64 1,403,400.00 Rp 898,176.00 0.530 0.000 0.000 0.00 0.000
C PEKERJAAN BETON
1 Sloof Beton Bertulang uk. 30x30 cm -
Pembesian Ulir D13 Kg 86.48 20,100.00 Rp 1,738,248.00 1.026 0.000 0.000 0.00 0.000
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) m³ 0.72 1,403,400.00 Rp 1,010,448.00 0.596 0.000 0.000 0.00 0.000
Pembesian Ulir D13 Kg 120.03 20,100.00 Rp 2,412,603.00 1.424 0.000 0.000 0.00 0.000
Pembesian Polos Kg 33.14 19,500.00 Rp 646,230.00 0.381 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.08 1,403,400.00 Rp 1,515,672.00 0.894 0.000 0.000 0.00 0.000
Pembesian Ulir D13 Kg 107.31 20,100.00 Rp 2,156,931.00 1.273 0.000 0.000 0.00 0.000
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.90 1,403,400.00 Rp 1,263,060.00 0.745 0.000 0.000 0.00 0.000
Pembesian Utama Kg 154.13 20,100.00 Rp 3,098,013.00 1.828 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.81 1,403,400.00 Rp 1,136,754.00 0.671 0.000 0.000 0.00 0.000
TOTAL III Rp 37,601,622.00 0.000 0.476 0.476
1 Pasangan batu bata camp. 1:4 M² 17.27 150,200.00 Rp 2,593,954.00 1.531 0.000 0.000 0.00 0.000
2 Plesteran camp. 1:4 M² 31.04 87,900.00 Rp 2,728,416.00 1.610 0.000 0.000 0.00 0.000
1 Jet Pump Set 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.000 0.000 0.00 0.000
Head : 50 M -
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
Data Listrik 0,65 kw / 650 w/ -
Operasi : Automatic by LS -
Lengkap dengan Panel kontrol, kabel kontrol dari panel 0.00 0.000
2 Pompa Air Unit 1.00 600,000.00 Rp 600,000.00 0.354 0.000 0.000 0.00 0.000
3 Pipa PVC AW Ø1" m 242.86 46,900.00 Rp 11,390,134.00 6.721 0.000 0.000 0.00 0.000
4 Stop Kran bh 6.00 24,000.00 Rp 144,000.00 0.085 0.000 0.000 0.00 0.000
5 Long Elbow 90 Deg. PVC AW dia. 1" bh 9.00 12,000.00 Rp 108,000.00 0.064 0.000 0.000 0.00 0.000
6 Tangki Air Komplit Kap. 2000Liter + Radar Automatic Set 1.00 4,500,000.00 Rp 4,500,000.00 2.655 0.000 0.000 0.00 0.000
TOTAL V Rp 19,742,134.00 0.000 0.000 0.000
VI PEKERJAAN ELEKTRIKAL -
1 Disteribusi Panel Unit 1.00 5,500,000.00 Rp 5,500,000.00 3.246 0.000 0.000 0.00 0.000
- MCB, 1p, 25 A
- MCB, 1p, 10 A 0.00 0.000
- MCB, 1p, 6 A -
- Fuse 4 A -
- Cu Bar 50A ( 12 x 2 ) MM -
2 Biaya Pembuatan Daya Listrik Ls 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.000 0.000 0.00 0.000
TOTAL VI Rp 8,500,000.00 0.000 0.000 0.000
1 Pekerjaan Rangka Besi Hollow 40 x 40 mm, T= 2 mm Kg 61.70 46,200.00 Rp 2,850,540.00 1.682 0.000 0.000 0.00 0.000
0.00 0.000
TOTAL VII Rp 2,850,540.00 0.000 0.000 0.000
JUMLAH Rp 169,461,565.00 100.0 - 8.92 8.92
PPN 11% Rp 18,640,772.15 RE-SCHEDULE s/d MINGGU INI 13.304
TOTAL JUMLAH Rp 188,102,337.15 REALISASI s/d MINGGU INI 8.923
DEVIASI -4.381
MINGGU KE = MINGGU II
PEKERJAAN : SUMUR BOR DAN TOWER
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00 335,000.00 Rp 335,000.00 0.198 1.00 0.198 0.000 1.00 0.198
2 Pembersihan Lahan Ls 1.00 940,000.00 Rp 940,000.00 0.555 0.50 0.277 0.50 0.277 1.00 0.555
3 Peralatan dan Perlengkapan K3 Ls 1.00 935,000.00 Rp 935,000.00 0.552 0.50 0.276 0.50 0.276 1.00 0.552
TOTAL I Rp 2,210,000.00 0.751 0.553 1.304
A Pekerjaan Pemboran -
1 Pengeboran Sumur Bor 100 Meter Lubang, Dia. 8 3/4" M' 70.00 164,500.00 Rp 11,515,000.00 6.795 70.00 6.795 0.000 70.00 6.795
2 Reaming Lubang Sumur Bor, Dia. 8 3/4"-12" M' 70.00 152,200.00 Rp 10,654,000.00 6.287 0.00 0.000 70.00 6.287 70.00 6.287
3 Pemasangan dan pembongkaran Temporary Casing 12" M' 70.00 200,800.00 Rp 14,056,000.00 8.295 0.00 0.000 70.00 8.295 70.00 8.295
1 Pemasangan cassing dasar pipa Galvanis 4" M' 24.00 394,000.00 Rp 9,456,000.00 5.580 0.00 0.000 24.00 5.580 24.00 5.580
2 Pemasangan cassing pipa PVC 3" M' 31.00 92,100.00 Rp 2,855,100.00 1.685 0.00 0.000 31.00 1.685 31.00 1.685
3 Pemasangan centralizer Bh 3.00 146,100.00 Rp 438,300.00 0.259 0.00 0.000 3.00 0.259 3.00 0.259
4 Pipa Hisap Galvanis Ø2" + Accesories M' 70.00 176,000.00 Rp 12,320,000.00 7.270 0.00 0.000 0.000 0.00 0.000
5 Cor BetonBox Penutup Sumur Titik 1.00 798,500.00 Rp 798,500.00 0.471 0.00 0.000 0.000 0.00 0.000
6 Pompa Otomat Submersible 3 HP Cassing 3" outlet 2" Unit 1.00 6,500,000.00 Rp 6,500,000.00 3.836 0.00 0.000 0.000 0.00 0.000
1 Galian Tanah M³ 6.00 102,100.00 Rp 612,600.00 0.361 6.00 0.361 0.000 6.00 0.361
2 Urugan Pasir M³ 0.60 203,100.00 Rp 121,860.00 0.072 0.60 0.072 0.000 0.60 0.072
3 Lantai Kerja Beton K 175 M³ 0.60 1,321,800.00 Rp 793,080.00 0.468 0.60 0.468 0.000 0.60 0.468
4 Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.20 1,403,400.00 Rp 1,684,080.00 0.994 0.00 0.000 1.20 0.994 1.20 0.994
5 Pekerjaan Pembesian Kg 53.43 19,500.00 Rp 1,041,885.00 0.615 0.00 0.000 53.43 0.615 53.43 0.615
6 Bekisting 2x Pakai M² 1.50 580,500.00 Rp 870,750.00 0.514 0.00 0.000 1.50 0.514 1.50 0.514
7 Pasangan dinding bata merah tebal 1/2 bata camp. 1pc : 4pp M² 17.00 157,000.00 Rp 2,669,000.00 1.575 0.00 0.000 17.00 1.575 17.00 1.575
8 Kolom Praktis Beton Bertulang 11 x 11 Cm M 6.00 150,000.00 Rp 900,000.00 0.531 0.00 0.000 6.00 0.531 6.00 0.531
9 Plesteran camp. 1pc : 4pp M² 23.00 93,600.00 Rp 2,152,800.00 1.270 0.00 0.000 23.00 1.270 23.00 1.270
10 Pintu Control Plat Besi 4 mm Lengkap Accecoris Ls 1.00 800,000.00 Rp 800,000.00 0.472 0.00 0.000 1.00 0.472 1.00 0.472
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
11 Stop Keran (Untuk Pembuangan dan Outlet Ke Roof Tank) Bh 2.00 12,100.00 Rp 24,200.00 0.014 0.00 0.000 2.00 0.014 2.00 0.014
12 Pipa (Outlet+Pembuangan) M' 16.00 55,700.00 Rp 891,200.00 0.526 0.00 0.000 16.00 0.526 16.00 0.526
13 Keramik 40 x40 mm M² 29.00 359,200.00 Rp 10,416,800.00 6.147 0.00 0.000 0.000 0.00 0.000
TOTAL II Rp 91,571,155.00 7.696 28.616 36.313
1 Galian Tanah Pondasi M³ 2.56 102,100.00 Rp 261,376.00 0.154 2.56 0.154 0.000 2.56 0.154
2 Mengurug kembali bekas galian M³ 0.85 74,300.00 Rp 63,155.00 0.037 0.00 0.000 0.85 0.037 0.85 0.037
1 Urugan Pasir, tebal 10 cm M³ 0.39 203,100.00 Rp 79,209.00 0.047 0.39 0.047 0.000 0.39 0.047
2 Cor Lantai Kerja Pondasi f'c 7,4 Mpa, tebal 7 cm M³ 0.39 1,193,600.00 Rp 465,504.00 0.275 0.39 0.275 0.000 0.39 0.275
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 0.00 0.000 0.000 0.00 0.000
Pembesian Ulir D13 Kg 203.38 20,100.00 Rp 4,087,938.00 2.412 0.00 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.64 1,403,400.00 Rp 898,176.00 0.530 0.00 0.000 0.000 0.00 0.000
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 0.00 0.000 0.000 0.00 0.000
Pembesian Ulir D13 Kg 86.48 20,100.00 Rp 1,738,248.00 1.026 0.00 0.000 0.000 0.00 0.000
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.00 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) m³ 0.72 1,403,400.00 Rp 1,010,448.00 0.596 0.00 0.000 0.000 0.00 0.000
Bekisting M² 14.40 425,500.00 Rp 6,127,200.00 3.616 0.00 0.000 0.000 0.00 0.000
Pembesian Ulir D13 Kg 120.03 20,100.00 Rp 2,412,603.00 1.424 0.00 0.000 0.000 0.00 0.000
Pembesian Polos Kg 33.14 19,500.00 Rp 646,230.00 0.381 0.00 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.08 1,403,400.00 Rp 1,515,672.00 0.894 0.00 0.000 0.000 0.00 0.000
Bekisting m² 9.00 428,700.00 Rp 3,858,300.00 2.277 0.00 0.000 0.000 0.00 0.000
Pembesian Ulir D13 Kg 107.31 20,100.00 Rp 2,156,931.00 1.273 0.00 0.000 0.000 0.00 0.000
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.00 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.90 1,403,400.00 Rp 1,263,060.00 0.745 0.00 0.000 0.000 0.00 0.000
Bekisting M² 6.25 580,500.00 Rp 3,628,125.00 2.141 0.00 0.000 0.000 0.00 0.000
Pembesian Utama Kg 154.13 20,100.00 Rp 3,098,013.00 1.828 0.00 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.81 1,403,400.00 Rp 1,136,754.00 0.671 0.00 0.000 0.000 0.00 0.000
TOTAL III Rp 37,601,622.00 0.476 0.037 0.513
1 Pasangan batu bata camp. 1:4 M² 17.27 150,200.00 Rp 2,593,954.00 1.531 0.00 0.000 0.000 0.00 0.000
2 Plesteran camp. 1:4 M² 31.04 87,900.00 Rp 2,728,416.00 1.610 0.00 0.000 0.000 0.00 0.000
3 Acian M² 31.04 53,600.00 Rp 1,663,744.00 0.982 0.00 0.000 0.000 0.00 0.000
TOTAL IV Rp 6,986,114.00 0.000 0.000 0.000
1 Jet Pump Set 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 0.000 0.00 0.000
Head : 50 M - 0.00
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
Data Listrik 0,65 kw / 650 w/ - 0.00
Lengkap dengan Panel kontrol, kabel kontrol dari panel 0.00 0.00 0.000
2 Pompa Air Unit 1.00 600,000.00 Rp 600,000.00 0.354 0.00 0.000 0.000 0.00 0.000
3 Pipa PVC AW Ø1" m 242.86 46,900.00 Rp 11,390,134.00 6.721 0.00 0.000 0.000 0.00 0.000
4 Stop Kran bh 6.00 24,000.00 Rp 144,000.00 0.085 0.00 0.000 0.000 0.00 0.000
5 Long Elbow 90 Deg. PVC AW dia. 1" bh 9.00 12,000.00 Rp 108,000.00 0.064 0.00 0.000 0.000 0.00 0.000
6 Tangki Air Komplit Kap. 2000Liter + Radar Automatic Set 1.00 4,500,000.00 Rp 4,500,000.00 2.655 0.00 0.000 0.000 0.00 0.000
TOTAL V Rp 19,742,134.00 0.000 0.000 0.000
VI PEKERJAAN ELEKTRIKAL -
1 Disteribusi Panel Unit 1.00 5,500,000.00 Rp 5,500,000.00 3.246 0.00 0.000 0.000 0.00 0.000
- Fuse 4 A - 0.00
2 Biaya Pembuatan Daya Listrik Ls 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 0.000 0.00 0.000
TOTAL VI Rp 8,500,000.00 0.000 0.000 0.000
1 Pekerjaan Rangka Besi Hollow 40 x 40 mm, T= 2 mm Kg 61.70 46,200.00 Rp 2,850,540.00 1.682 0.00 0.000 0.000 0.00 0.000
0.00 0.000
TOTAL VII Rp 2,850,540.00 0.000 0.000 0.000
JUMLAH Rp 169,461,565.00 100.0 8.92 29.21 38.13
PPN 11% Rp 18,640,772.15 RE-SCHEDULE s/d MINGGU INI 39.467
TOTAL JUMLAH Rp 188,102,337.15 REALISASI s/d MINGGU INI 38.130
DEVIASI -1.337
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00 335,000.00 Rp 335,000.00 0.198 1.00 0.198 0.000 1.00 0.198
2 Pembersihan Lahan Ls 1.00 940,000.00 Rp 940,000.00 0.555 1.00 0.555 0.000 1.00 0.555
3 Peralatan dan Perlengkapan K3 Ls 1.00 935,000.00 Rp 935,000.00 0.552 1.00 0.552 0.000 1.00 0.552
TOTAL I Rp 2,210,000.00 1.304 0.000 1.304
A Pekerjaan Pemboran -
1 Pengeboran Sumur Bor 100 Meter Lubang, Dia. 8 3/4" M' 70.00 164,500.00 Rp 11,515,000.00 6.795 70.00 6.795 0.000 70.00 6.795
2 Reaming Lubang Sumur Bor, Dia. 8 3/4"-12" M' 70.00 152,200.00 Rp 10,654,000.00 6.287 70.00 6.287 0.000 70.00 6.287
3 Pemasangan dan pembongkaran Temporary Casing 12" M' 70.00 200,800.00 Rp 14,056,000.00 8.295 70.00 8.295 0.000 70.00 8.295
1 Pemasangan cassing dasar pipa Galvanis 4" M' 24.00 394,000.00 Rp 9,456,000.00 5.580 24.00 5.580 0.000 24.00 5.580
2 Pemasangan cassing pipa PVC 3" M' 31.00 92,100.00 Rp 2,855,100.00 1.685 31.00 1.685 0.000 31.00 1.685
3 Pemasangan centralizer Bh 3.00 146,100.00 Rp 438,300.00 0.259 3.00 0.259 0.000 3.00 0.259
4 Pipa Hisap Galvanis Ø2" + Accesories M' 70.00 176,000.00 Rp 12,320,000.00 7.270 0.00 0.000 70.00 7.270 70.00 7.270
5 Cor BetonBox Penutup Sumur Titik 1.00 798,500.00 Rp 798,500.00 0.471 0.00 0.000 1.00 0.471 1.00 0.471
6 Pompa Otomat Submersible 3 HP Cassing 3" outlet 2" Unit 1.00 6,500,000.00 Rp 6,500,000.00 3.836 0.00 0.000 1.00 3.836 1.00 3.836
1 Galian Tanah M³ 6.00 102,100.00 Rp 612,600.00 0.361 6.00 0.361 0.000 6.00 0.361
2 Urugan Pasir M³ 0.60 203,100.00 Rp 121,860.00 0.072 0.60 0.072 0.000 0.60 0.072
3 Lantai Kerja Beton K 175 M³ 0.60 1,321,800.00 Rp 793,080.00 0.468 0.60 0.468 0.000 0.60 0.468
4 Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.20 1,403,400.00 Rp 1,684,080.00 0.994 1.20 0.994 0.000 1.20 0.994
5 Pekerjaan Pembesian Kg 53.43 19,500.00 Rp 1,041,885.00 0.615 53.43 0.615 0.000 53.43 0.615
6 Bekisting 2x Pakai M² 1.50 580,500.00 Rp 870,750.00 0.514 1.50 0.514 0.000 1.50 0.514
7 Pasangan dinding bata merah tebal 1/2 bata camp. 1pc : 4pp M² 17.00 157,000.00 Rp 2,669,000.00 1.575 17.00 1.575 0.000 17.00 1.575
8 Kolom Praktis Beton Bertulang 11 x 11 Cm M 6.00 150,000.00 Rp 900,000.00 0.531 6.00 0.531 0.000 6.00 0.531
9 Plesteran camp. 1pc : 4pp M² 23.00 93,600.00 Rp 2,152,800.00 1.270 23.00 1.270 0.000 23.00 1.270
10 Pintu Control Plat Besi 4 mm Lengkap Accecoris Ls 1.00 800,000.00 Rp 800,000.00 0.472 1.00 0.472 0.000 1.00 0.472
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
11 Stop Keran (Untuk Pembuangan dan Outlet Ke Roof Tank) Bh 2.00 12,100.00 Rp 24,200.00 0.014 2.00 0.014 0.000 2.00 0.014
12 Pipa (Outlet+Pembuangan) M' 16.00 55,700.00 Rp 891,200.00 0.526 16.00 0.526 0.000 16.00 0.526
13 Keramik 40 x40 mm M² 29.00 359,200.00 Rp 10,416,800.00 6.147 0.00 0.000 29.00 6.147 29.00 6.147
TOTAL II Rp 91,571,155.00 36.313 17.724 54.037
1 Galian Tanah Pondasi M³ 2.56 102,100.00 Rp 261,376.00 0.154 2.56 0.154 0.000 2.56 0.154
2 Mengurug kembali bekas galian M³ 0.85 74,300.00 Rp 63,155.00 0.037 0.85 0.037 0.000 0.85 0.037
1 Urugan Pasir, tebal 10 cm M³ 0.39 203,100.00 Rp 79,209.00 0.047 0.39 0.047 0.000 0.39 0.047
2 Cor Lantai Kerja Pondasi f'c 7,4 Mpa, tebal 7 cm M³ 0.39 1,193,600.00 Rp 465,504.00 0.275 0.39 0.275 0.000 0.39 0.275
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 0.00 0.000 4.80 0.678 4.80 0.678
Pembesian Ulir D13 Kg 203.38 20,100.00 Rp 4,087,938.00 2.412 0.00 0.000 203.38 2.412 203.38 2.412
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.64 1,403,400.00 Rp 898,176.00 0.530 0.00 0.000 0.64 0.530 0.64 0.530
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 0.00 0.000 4.80 0.678 4.80 0.678
Pembesian Ulir D13 Kg 86.48 20,100.00 Rp 1,738,248.00 1.026 0.00 0.000 86.48 1.026 86.48 1.026
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.00 0.000 21.96 0.253 21.96 0.253
Cor beton mutu f’= 21.7 MPa (K 250) m³ 0.72 1,403,400.00 Rp 1,010,448.00 0.596 0.00 0.000 0.72 0.596 0.72 0.596
Bekisting M² 14.40 425,500.00 Rp 6,127,200.00 3.616 0.00 0.000 14.40 3.616 14.40 3.616
Pembesian Ulir D13 Kg 120.03 20,100.00 Rp 2,412,603.00 1.424 0.00 0.000 120.03 1.424 120.03 1.424
Pembesian Polos Kg 33.14 19,500.00 Rp 646,230.00 0.381 0.00 0.000 33.14 0.381 33.14 0.381
Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.08 1,403,400.00 Rp 1,515,672.00 0.894 0.00 0.000 1.08 0.894 1.08 0.894
Bekisting m² 9.00 428,700.00 Rp 3,858,300.00 2.277 0.00 0.000 0.000 0.00 0.000
Pembesian Ulir D13 Kg 107.31 20,100.00 Rp 2,156,931.00 1.273 0.00 0.000 0.000 0.00 0.000
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.00 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.90 1,403,400.00 Rp 1,263,060.00 0.745 0.00 0.000 0.000 0.00 0.000
Bekisting M² 6.25 580,500.00 Rp 3,628,125.00 2.141 0.00 0.000 0.000 0.00 0.000
Pembesian Utama Kg 154.13 20,100.00 Rp 3,098,013.00 1.828 0.00 0.000 0.000 0.00 0.000
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.81 1,403,400.00 Rp 1,136,754.00 0.671 0.00 0.000 0.000 0.00 0.000
TOTAL III Rp 37,601,622.00 0.513 12.488 13.001
1 Pasangan batu bata camp. 1:4 M² 17.27 150,200.00 Rp 2,593,954.00 1.531 0.00 0.000 0.000 0.00 0.000
2 Plesteran camp. 1:4 M² 31.04 87,900.00 Rp 2,728,416.00 1.610 0.00 0.000 0.000 0.00 0.000
3 Acian M² 31.04 53,600.00 Rp 1,663,744.00 0.982 0.00 0.000 0.000 0.00 0.000
TOTAL IV Rp 6,986,114.00 0.000 0.000 0.000
1 Jet Pump Set 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 0.000 0.00 0.000
Head : 50 M - 0.00
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
Data Listrik 0,65 kw / 650 w/ - 0.00
Lengkap dengan Panel kontrol, kabel kontrol dari panel 0.00 0.00 0.000
2 Pompa Air Unit 1.00 600,000.00 Rp 600,000.00 0.354 0.00 0.000 0.000 0.00 0.000
3 Pipa PVC AW Ø1" m 242.86 46,900.00 Rp 11,390,134.00 6.721 0.00 0.000 0.000 0.00 0.000
4 Stop Kran bh 6.00 24,000.00 Rp 144,000.00 0.085 0.00 0.000 0.000 0.00 0.000
5 Long Elbow 90 Deg. PVC AW dia. 1" bh 9.00 12,000.00 Rp 108,000.00 0.064 0.00 0.000 0.000 0.00 0.000
6 Tangki Air Komplit Kap. 2000Liter + Radar Automatic Set 1.00 4,500,000.00 Rp 4,500,000.00 2.655 0.00 0.000 0.000 0.00 0.000
TOTAL V Rp 19,742,134.00 0.000 0.000 0.000
VI PEKERJAAN ELEKTRIKAL -
1 Disteribusi Panel Unit 1.00 5,500,000.00 Rp 5,500,000.00 3.246 0.00 0.000 0.000 0.00 0.000
- Fuse 4 A - 0.00
2 Biaya Pembuatan Daya Listrik Ls 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 0.000 0.00 0.000
TOTAL VI Rp 8,500,000.00 0.000 0.000 0.000
1 Pekerjaan Rangka Besi Hollow 40 x 40 mm, T= 2 mm Kg 61.70 46,200.00 Rp 2,850,540.00 1.682 0.00 0.000 0.000 0.00 0.000
0.00 0.000
TOTAL VII Rp 2,850,540.00 0.000 0.000 0.000
JUMLAH Rp 169,461,565.00 100.0 38.13 30.21 68.34
PPN 11% Rp 18,640,772.15 RE-SCHEDULE s/d MINGGU INI 68.979
TOTAL JUMLAH Rp 188,102,337.15 REALISASI s/d MINGGU INI 68.342
DEVIASI -0.637
MINGGU KE = MINGGU IV
PEKERJAAN : SUMUR BOR DAN TOWER
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00 335,000.00 Rp 335,000.00 0.198 1.00 0.198 0.00 0.000 1.00 0.198
2 Pembersihan Lahan Ls 1.00 940,000.00 Rp 940,000.00 0.555 1.00 0.555 0.000 1.00 0.555
3 Peralatan dan Perlengkapan K3 Ls 1.00 935,000.00 Rp 935,000.00 0.552 1.00 0.552 0.000 1.00 0.552
TOTAL I Rp 2,210,000.00 1.304 0.000 1.304
A Pekerjaan Pemboran -
1 Pengeboran Sumur Bor 100 Meter Lubang, Dia. 8 3/4" M' 70.00 164,500.00 Rp 11,515,000.00 6.795 70.00 6.795 0.00 0.000 70.00 6.795
2 Reaming Lubang Sumur Bor, Dia. 8 3/4"-12" M' 70.00 152,200.00 Rp 10,654,000.00 6.287 70.00 6.287 0.00 0.000 70.00 6.287
3 Pemasangan dan pembongkaran Temporary Casing 12" M' 70.00 200,800.00 Rp 14,056,000.00 8.295 70.00 8.295 0.00 0.000 70.00 8.295
1 Pemasangan cassing dasar pipa Galvanis 4" M' 24.00 394,000.00 Rp 9,456,000.00 5.580 24.00 5.580 0.00 0.000 24.00 5.580
2 Pemasangan cassing pipa PVC 3" M' 31.00 92,100.00 Rp 2,855,100.00 1.685 31.00 1.685 0.00 0.000 31.00 1.685
3 Pemasangan centralizer Bh 3.00 146,100.00 Rp 438,300.00 0.259 3.00 0.259 0.00 0.000 3.00 0.259
4 Pipa Hisap Galvanis Ø2" + Accesories M' 70.00 176,000.00 Rp 12,320,000.00 7.270 70.00 7.270 0.00 0.000 70.00 7.270
5 Cor BetonBox Penutup Sumur Titik 1.00 798,500.00 Rp 798,500.00 0.471 1.00 0.471 0.00 0.000 1.00 0.471
6 Pompa Otomat Submersible 3 HP Cassing 3" outlet 2" Unit 1.00 6,500,000.00 Rp 6,500,000.00 3.836 1.00 3.836 0.00 0.000 1.00 3.836
1 Galian Tanah M³ 6.00 102,100.00 Rp 612,600.00 0.361 6.00 0.361 0.00 0.000 6.00 0.361
2 Urugan Pasir M³ 0.60 203,100.00 Rp 121,860.00 0.072 0.60 0.072 0.00 0.000 0.60 0.072
3 Lantai Kerja Beton K 175 M³ 0.60 1,321,800.00 Rp 793,080.00 0.468 0.60 0.468 0.00 0.000 0.60 0.468
4 Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.20 1,403,400.00 Rp 1,684,080.00 0.994 1.20 0.994 0.00 0.000 1.20 0.994
5 Pekerjaan Pembesian Kg 53.43 19,500.00 Rp 1,041,885.00 0.615 53.43 0.615 0.00 0.000 53.43 0.615
6 Bekisting 2x Pakai M² 1.50 580,500.00 Rp 870,750.00 0.514 1.50 0.514 0.00 0.000 1.50 0.514
7 Pasangan dinding bata merah tebal 1/2 bata camp. 1pc : 4pp M² 17.00 157,000.00 Rp 2,669,000.00 1.575 17.00 1.575 0.00 0.000 17.00 1.575
8 Kolom Praktis Beton Bertulang 11 x 11 Cm M 6.00 150,000.00 Rp 900,000.00 0.531 6.00 0.531 0.00 0.000 6.00 0.531
9 Plesteran camp. 1pc : 4pp M² 23.00 93,600.00 Rp 2,152,800.00 1.270 23.00 1.270 0.00 0.000 23.00 1.270
10 Pintu Control Plat Besi 4 mm Lengkap Accecoris Ls 1.00 800,000.00 Rp 800,000.00 0.472 1.00 0.472 0.00 0.000 1.00 0.472
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. MINGGU LALU MINGGU INI S/D MINGGU INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
11 Stop Keran (Untuk Pembuangan dan Outlet Ke Roof Tank) Bh 2.00 12,100.00 Rp 24,200.00 0.014 2.00 0.014 0.00 0.000 2.00 0.014
12 Pipa (Outlet+Pembuangan) M' 16.00 55,700.00 Rp 891,200.00 0.526 16.00 0.526 0.00 0.000 16.00 0.526
13 Keramik 40 x40 mm M² 29.00 359,200.00 Rp 10,416,800.00 6.147 29.00 6.147 0.00 0.000 29.00 6.147
TOTAL II Rp 91,571,155.00 54.037 0.000 54.037
1 Galian Tanah Pondasi M³ 2.56 102,100.00 Rp 261,376.00 0.154 2.56 0.154 0.00 0.000 2.56 0.154
2 Mengurug kembali bekas galian M³ 0.85 74,300.00 Rp 63,155.00 0.037 0.85 0.037 0.00 0.000 0.85 0.037
1 Urugan Pasir, tebal 10 cm M³ 0.39 203,100.00 Rp 79,209.00 0.047 0.39 0.047 0.00 0.000 0.39 0.047
2 Cor Lantai Kerja Pondasi f'c 7,4 Mpa, tebal 7 cm M³ 0.39 1,193,600.00 Rp 465,504.00 0.275 0.39 0.275 0.00 0.000 0.39 0.275
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 4.80 0.678 0.00 0.000 4.80 0.678
Pembesian Ulir D13 Kg 203.38 20,100.00 Rp 4,087,938.00 2.412 203.38 2.412 0.00 0.000 203.38 2.412
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.64 1,403,400.00 Rp 898,176.00 0.530 0.64 0.530 0.00 0.000 0.64 0.530
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 4.80 0.678 0.00 0.000 4.80 0.678
Pembesian Ulir D13 Kg 86.48 20,100.00 Rp 1,738,248.00 1.026 86.48 1.026 0.00 0.000 86.48 1.026
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 21.96 0.253 0.00 0.000 21.96 0.253
Cor beton mutu f’= 21.7 MPa (K 250) m³ 0.72 1,403,400.00 Rp 1,010,448.00 0.596 0.72 0.596 0.00 0.000 0.72 0.596
Bekisting M² 14.40 425,500.00 Rp 6,127,200.00 3.616 14.40 3.616 0.00 0.000 14.40 3.616
Pembesian Ulir D13 Kg 120.03 20,100.00 Rp 2,412,603.00 1.424 120.03 1.424 0.00 0.000 120.03 1.424
Pembesian Polos Kg 33.14 19,500.00 Rp 646,230.00 0.381 33.14 0.381 0.00 0.000 33.14 0.381
Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.08 1,403,400.00 Rp 1,515,672.00 0.894 1.08 0.894 0.00 0.000 1.08 0.894
Bekisting m² 9.00 428,700.00 Rp 3,858,300.00 2.277 0.00 0.000 9.00 2.277 9.00 2.277
Pembesian Ulir D13 Kg 107.31 20,100.00 Rp 2,156,931.00 1.273 0.00 0.000 107.31 1.273 107.31 1.273
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.00 0.000 21.96 0.253 21.96 0.253
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.90 1,403,400.00 Rp 1,263,060.00 0.745 0.00 0.000 0.90 0.745 0.90 0.745
Bekisting M² 6.25 580,500.00 Rp 3,628,125.00 2.141 0.00 0.000 6.25 2.141 6.25 2.141
Pembesian Utama Kg 154.13 20,100.00 Rp 3,098,013.00 1.828 0.00 0.000 154.13 1.828 154.13 1.828
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.81 1,403,400.00 Rp 1,136,754.00 0.671 0.00 0.000 0.81 0.671 0.81 0.671
TOTAL III Rp 37,601,622.00 13.001 9.188 22.189
1 Pasangan batu bata camp. 1:4 M² 17.27 150,200.00 Rp 2,593,954.00 1.531 0.00 0.000 17.27 1.531 17.27 1.531
2 Plesteran camp. 1:4 M² 31.04 87,900.00 Rp 2,728,416.00 1.610 0.00 0.000 31.04 1.610 31.04 1.610
3 Acian M² 31.04 53,600.00 Rp 1,663,744.00 0.982 0.00 0.000 31.04 0.982 31.04 0.982
TOTAL IV Rp 6,986,114.00 0.000 4.123 4.123
1 Jet Pump Set 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 1.00 1.770 1.00 1.770
Lengkap dengan Panel kontrol, kabel kontrol dari panel 0.00 0.00 0.00 0.000
ke pompa, dudukan, switch, dan assesoris lainnya. 0.00 0.00 0.00 0.000
2 Pompa Air Unit 1.00 600,000.00 Rp 600,000.00 0.354 0.00 0.000 1.00 0.354 1.00 0.354
3 Pipa PVC AW Ø1" m 242.86 46,900.00 Rp 11,390,134.00 6.721 0.00 0.000 242.86 6.721 242.86 6.721
4 Stop Kran bh 6.00 24,000.00 Rp 144,000.00 0.085 0.00 0.000 6.00 0.085 6.00 0.085
5 Long Elbow 90 Deg. PVC AW dia. 1" bh 9.00 12,000.00 Rp 108,000.00 0.064 0.00 0.000 9.00 0.064 9.00 0.064
6 Tangki Air Komplit Kap. 2000Liter + Radar Automatic Set 1.00 4,500,000.00 Rp 4,500,000.00 2.655 0.00 0.000 1.00 2.655 1.00 2.655
TOTAL V Rp 19,742,134.00 0.000 11.650 11.650
VI PEKERJAAN ELEKTRIKAL -
1 Disteribusi Panel Unit 1.00 5,500,000.00 Rp 5,500,000.00 3.246 0.00 0.000 1.00 3.246 1.00 3.246
2 Biaya Pembuatan Daya Listrik Ls 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 1.00 1.770 1.00 1.770
TOTAL VI Rp 8,500,000.00 0.000 5.016 5.016
1 Pekerjaan Rangka Besi Hollow 40 x 40 mm, T= 2 mm Kg 61.70 46,200.00 Rp 2,850,540.00 1.682 0.00 0.000 61.70 1.682 61.70 1.682
0.00 0.000
TOTAL VII Rp 2,850,540.00 0.000 1.682 1.682
JUMLAH Rp 169,461,565.00 100.0 68.34 31.66 100.00
PPN 11% Rp 18,640,772.15 RE-SCHEDULE s/d MINGGU INI 100.000
TOTAL JUMLAH Rp 188,102,337.15 REALISASI s/d MINGGU INI 100.000
DEVIASI 0.000
BULAN KE = BULAN I
PEKERJAAN : SUMUR BOR DAN TOWER
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. BULAN LALU BULAN INI S/D BULAN INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1.00 335,000.00 Rp 335,000.00 0.198 1.00 0.198 0.00 0.000 1.00 0.198
2 Pembersihan Lahan Ls 1.00 940,000.00 Rp 940,000.00 0.555 1.00 0.555 0.000 1.00 0.555
3 Peralatan dan Perlengkapan K3 Ls 1.00 935,000.00 Rp 935,000.00 0.552 1.00 0.552 0.000 1.00 0.552
TOTAL I Rp 2,210,000.00 1.304 0.000 1.304
A Pekerjaan Pemboran -
1 Pengeboran Sumur Bor 100 Meter Lubang, Dia. 8 3/4" M' 70.00 164,500.00 Rp 11,515,000.00 6.795 70.00 6.795 0.00 0.000 70.00 6.795
2 Reaming Lubang Sumur Bor, Dia. 8 3/4"-12" M' 70.00 152,200.00 Rp 10,654,000.00 6.287 70.00 6.287 0.00 0.000 70.00 6.287
3 Pemasangan dan pembongkaran Temporary Casing 12" M' 70.00 200,800.00 Rp 14,056,000.00 8.295 70.00 8.295 0.00 0.000 70.00 8.295
1 Pemasangan cassing dasar pipa Galvanis 4" M' 24.00 394,000.00 Rp 9,456,000.00 5.580 24.00 5.580 0.00 0.000 24.00 5.580
2 Pemasangan cassing pipa PVC 3" M' 31.00 92,100.00 Rp 2,855,100.00 1.685 31.00 1.685 0.00 0.000 31.00 1.685
3 Pemasangan centralizer Bh 3.00 146,100.00 Rp 438,300.00 0.259 3.00 0.259 0.00 0.000 3.00 0.259
4 Pipa Hisap Galvanis Ø2" + Accesories M' 70.00 176,000.00 Rp 12,320,000.00 7.270 70.00 7.270 0.00 0.000 70.00 7.270
5 Cor BetonBox Penutup Sumur Titik 1.00 798,500.00 Rp 798,500.00 0.471 1.00 0.471 0.00 0.000 1.00 0.471
6 Pompa Otomat Submersible 3 HP Cassing 3" outlet 2" Unit 1.00 6,500,000.00 Rp 6,500,000.00 3.836 1.00 3.836 0.00 0.000 1.00 3.836
1 Galian Tanah M³ 6.00 102,100.00 Rp 612,600.00 0.361 6.00 0.361 0.00 0.000 6.00 0.361
2 Urugan Pasir M³ 0.60 203,100.00 Rp 121,860.00 0.072 0.60 0.072 0.00 0.000 0.60 0.072
3 Lantai Kerja Beton K 175 M³ 0.60 1,321,800.00 Rp 793,080.00 0.468 0.60 0.468 0.00 0.000 0.60 0.468
4 Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.20 1,403,400.00 Rp 1,684,080.00 0.994 1.20 0.994 0.00 0.000 1.20 0.994
5 Pekerjaan Pembesian Kg 53.43 19,500.00 Rp 1,041,885.00 0.615 53.43 0.615 0.00 0.000 53.43 0.615
6 Bekisting 2x Pakai M² 1.50 580,500.00 Rp 870,750.00 0.514 1.50 0.514 0.00 0.000 1.50 0.514
7 Pasangan dinding bata merah tebal 1/2 bata camp. 1pc : 4pp M² 17.00 157,000.00 Rp 2,669,000.00 1.575 17.00 1.575 0.00 0.000 17.00 1.575
8 Kolom Praktis Beton Bertulang 11 x 11 Cm M 6.00 150,000.00 Rp 900,000.00 0.531 6.00 0.531 0.00 0.000 6.00 0.531
9 Plesteran camp. 1pc : 4pp M² 23.00 93,600.00 Rp 2,152,800.00 1.270 23.00 1.270 0.00 0.000 23.00 1.270
10 Pintu Control Plat Besi 4 mm Lengkap Accecoris Ls 1.00 800,000.00 Rp 800,000.00 0.472 1.00 0.472 0.00 0.000 1.00 0.472
KEMAJUAN PEKERJAAN
KONTRAK AWAL
NO JENIS PEKERJAAN SAT. BULAN LALU BULAN INI S/D BULAN INI
BOBOT BOBOT BOBOT
VOL HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME VOLUME VOLUME
(%) (%) (%)
11 Stop Keran (Untuk Pembuangan dan Outlet Ke Roof Tank) Bh 2.00 12,100.00 Rp 24,200.00 0.014 2.00 0.014 0.00 0.000 2.00 0.014
12 Pipa (Outlet+Pembuangan) M' 16.00 55,700.00 Rp 891,200.00 0.526 16.00 0.526 0.00 0.000 16.00 0.526
13 Keramik 40 x40 mm M² 29.00 359,200.00 Rp 10,416,800.00 6.147 29.00 6.147 0.00 0.000 29.00 6.147
TOTAL II Rp 91,571,155.00 54.037 0.000 54.037
1 Galian Tanah Pondasi M³ 2.56 102,100.00 Rp 261,376.00 0.154 2.56 0.154 0.00 0.000 2.56 0.154
2 Mengurug kembali bekas galian M³ 0.85 74,300.00 Rp 63,155.00 0.037 0.85 0.037 0.00 0.000 0.85 0.037
1 Urugan Pasir, tebal 10 cm M³ 0.39 203,100.00 Rp 79,209.00 0.047 0.39 0.047 0.00 0.000 0.39 0.047
2 Cor Lantai Kerja Pondasi f'c 7,4 Mpa, tebal 7 cm M³ 0.39 1,193,600.00 Rp 465,504.00 0.275 0.39 0.275 0.00 0.000 0.39 0.275
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 4.80 0.678 0.00 0.000 4.80 0.678
Pembesian Ulir D13 Kg 203.38 20,100.00 Rp 4,087,938.00 2.412 203.38 2.412 0.00 0.000 203.38 2.412
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.64 1,403,400.00 Rp 898,176.00 0.530 0.64 0.530 0.00 0.000 0.64 0.530
Bekisting M² 4.80 239,400.00 Rp 1,149,120.00 0.678 4.80 0.678 0.00 0.000 4.80 0.678
Pembesian Ulir D13 Kg 86.48 20,100.00 Rp 1,738,248.00 1.026 86.48 1.026 0.00 0.000 86.48 1.026
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 21.96 0.253 0.00 0.000 21.96 0.253
Cor beton mutu f’= 21.7 MPa (K 250) m³ 0.72 1,403,400.00 Rp 1,010,448.00 0.596 0.72 0.596 0.00 0.000 0.72 0.596
Bekisting M² 14.40 425,500.00 Rp 6,127,200.00 3.616 14.40 3.616 0.00 0.000 14.40 3.616
Pembesian Ulir D13 Kg 120.03 20,100.00 Rp 2,412,603.00 1.424 120.03 1.424 0.00 0.000 120.03 1.424
Pembesian Polos Kg 33.14 19,500.00 Rp 646,230.00 0.381 33.14 0.381 0.00 0.000 33.14 0.381
Cor beton mutu f’= 21.7 MPa (K 250) M³ 1.08 1,403,400.00 Rp 1,515,672.00 0.894 1.08 0.894 0.00 0.000 1.08 0.894
Bekisting m² 9.00 428,700.00 Rp 3,858,300.00 2.277 0.00 0.000 9.00 2.277 9.00 2.277
Pembesian Ulir D13 Kg 107.31 20,100.00 Rp 2,156,931.00 1.273 0.00 0.000 107.31 1.273 107.31 1.273
Pembesian Polos Kg 21.96 19,500.00 Rp 428,220.00 0.253 0.00 0.000 21.96 0.253 21.96 0.253
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.90 1,403,400.00 Rp 1,263,060.00 0.745 0.00 0.000 0.90 0.745 0.90 0.745
Bekisting M² 6.25 580,500.00 Rp 3,628,125.00 2.141 0.00 0.000 6.25 2.141 6.25 2.141
Pembesian Utama Kg 154.13 20,100.00 Rp 3,098,013.00 1.828 0.00 0.000 154.13 1.828 154.13 1.828
Cor beton mutu f’= 21.7 MPa (K 250) M³ 0.81 1,403,400.00 Rp 1,136,754.00 0.671 0.00 0.000 0.81 0.671 0.81 0.671
TOTAL III Rp 37,601,622.00 13.001 9.188 22.189
1 Pasangan batu bata camp. 1:4 M² 17.27 150,200.00 Rp 2,593,954.00 1.531 0.00 0.000 17.27 1.531 17.27 1.531
2 Plesteran camp. 1:4 M² 31.04 87,900.00 Rp 2,728,416.00 1.610 0.00 0.000 31.04 1.610 31.04 1.610
3 Acian M² 31.04 53,600.00 Rp 1,663,744.00 0.982 0.00 0.000 31.04 0.982 31.04 0.982
TOTAL IV Rp 6,986,114.00 0.000 4.123 4.123
1 Jet Pump Set 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 1.00 1.770 1.00 1.770
Lengkap dengan Panel kontrol, kabel kontrol dari panel 0.00 0.00 0.00 0.000
ke pompa, dudukan, switch, dan assesoris lainnya. 0.00 0.00 0.00 0.000
2 Pompa Air Unit 1.00 600,000.00 Rp 600,000.00 0.354 0.00 0.000 1.00 0.354 1.00 0.354
3 Pipa PVC AW Ø1" m 242.86 46,900.00 Rp 11,390,134.00 6.721 0.00 0.000 242.86 6.721 242.86 6.721
4 Stop Kran bh 6.00 24,000.00 Rp 144,000.00 0.085 0.00 0.000 6.00 0.085 6.00 0.085
5 Long Elbow 90 Deg. PVC AW dia. 1" bh 9.00 12,000.00 Rp 108,000.00 0.064 0.00 0.000 9.00 0.064 9.00 0.064
6 Tangki Air Komplit Kap. 2000Liter + Radar Automatic Set 1.00 4,500,000.00 Rp 4,500,000.00 2.655 0.00 0.000 1.00 2.655 1.00 2.655
TOTAL V Rp 19,742,134.00 0.000 11.650 11.650
VI PEKERJAAN ELEKTRIKAL -
1 Disteribusi Panel Unit 1.00 5,500,000.00 Rp 5,500,000.00 3.246 0.00 0.000 1.00 3.246 1.00 3.246
2 Biaya Pembuatan Daya Listrik Ls 1.00 3,000,000.00 Rp 3,000,000.00 1.770 0.00 0.000 1.00 1.770 1.00 1.770
TOTAL VI Rp 8,500,000.00 0.000 5.016 5.016
1 Pekerjaan Rangka Besi Hollow 40 x 40 mm, T= 2 mm Kg 61.70 46,200.00 Rp 2,850,540.00 1.682 0.00 0.000 61.70 1.682 61.70 1.682
0.00 0.000
TOTAL VII Rp 2,850,540.00 0.000 1.682 1.682
JUMLAH Rp 169,461,565.00 100.0 68.34 31.66 100.00
PPN 11% Rp 18,640,772.15 RE-SCHEDULE s/d BULAN INI 100.000
TOTAL JUMLAH Rp 188,102,337.15 REALISASI s/d BULAN INI 100.000
DEVIASI 0.000