Anda di halaman 1dari 15

PEMERINTAH KABUPATEN BOGOR

DINAS KESEHATAN
Jalan Raya Tegar Beriman, Kecamatan Cibinong, Kabupaten Bogor, Jawa Barat, Indonesia, 16914

LAPORAN MINGGUAN

MINGGU KE - 9 (SEMBILAN)

PERIODE :
14 November 2023 S/D 20 November 2023

PEKERJAAN

Belanja Jasa Konstruksi Relokasi Puskesmas Laladon Kecamatan


Ciomas

LOKASI

Kecamatan Ciomas - Bogor (Kab.)

TAHUN ANGGARAN
2023
MINGGU KE : 9 (SEMBILAN)
PERIODE : 14/11/2023 S/D 20/11/2023

REKAPITULASI TOTAL
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Nama Paket Pekerjaan : Belanja Jasa Konstruksi Relokasi Puskesmas Laladon Kecamatan Ciomas
Lokasi pekerjaan : Kecamatan Ciomas - Bogor (Kab.)
Tahun Anggaran : 2023

REKAP REALISASI KEMAJUAN PEKERJAAN


NO DESKRIPSI PEKERJAAN BOBOT (%) MINGGU LALU MINGGU INI S/D MINGGU INI
(%) BOBOT (%) BOBOT (%) BOBOT

I PEKERJAAN PERSIAPAN 1.58 62% 0.98 2% 0.039 65% 1.02

II PEKERJAAN STRUKTUR 12.11 91% 11.03 4% 0.502 95% 11.53

III PEKERJAAN STRUKTUR ATAS 19.65 77% 15.10 8% 1.598 85% 16.69

IV PEKERJAAN ARSITEKTUR 40.26 2% 0.78 6% 2.476 8% 3.25

V PEKERJAAN INFRASTRUKTUR 11.60 13% 1.53 4% 0.432 17% 1.96

VI PEKERJAAN ELEKTRIKAL 8.95 1% 0.09 0% - 1% 0.09

VII PEKERJAAN PLUMBING 5.86 2% 0.13 0% - 2% 0.13

JUMLAH 100.00 29.64 5.05 34.69


REALISASI PRESTASI 34.69 JANGKA WAKTU PELAKSANAAN 100 HARI KALENDER
RENCANA BOBOT 39.36 WAKTU YANG SUDAH BERJALAN 63 HARI KALENDER
DEVIASI -4.68 SISA WAKTU PELAKSANAAN 37 HARI KALENDER

PERMASALAHAN DILAPANGAN TINDAK LANJUT

Ciomas, 20 November 2023


Disetujui Oleh : Dibuat Oleh :
KONTRAKTOR PELAKSANA KONSULTAN PENGAWAS
CV. DUTA BANGUN PERTIWI CV. TIGA SAUDARA

Ade Syahra Sukmana Agus Pradilla Hartanto, ST


Pelaksana Team Leader
LAPORAN KEMAJUAN PEKERJAAN MINGGUAN

Nama Paket Pekerjaan : Belanja Jasa Konstruksi Relokasi Puskesmas Laladon Kecamatan Ciomas
Lokasi pekerjaan : Kecamatan Ciomas - Bogor (Kab.)
Tahun Anggaran : 2023

BOBOT PEKERJAAN
BOBOT
NO. URAIAN SAT. VOL. MINGGU LALU MINGGU INI S/D MINGGU INI
(%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)

I PEKERJAAN PERSIAPAN
1 Pasang papan nama proyek bh 2.00 0.01 2.00 0.01 - - 2.00 0.012
2 Listrik dan air kerja ls 1.00 0.08 0.56 0.05 0.07 0.006 0.63 0.052
3 Laporan administrasi proyek ls 1.00 0.17 0.56 0.09 0.07 0.012 0.63 0.105
4 Pengukuran dan pemasangan bouplang kayu m1 60.00 0.10 60.00 0.10 - - 60.00 0.098
5 Pembersihan Lahan ls 1.00 0.17 1.00 0.17 - - 1.00 0.166
6 Direksi keet m2 12.00 0.35 12.00 0.35 - - 12.00 0.354
7 Pembuatan gudang semen dan alat-alat m2 6.00 0.13 6.00 0.13 - - 6.00 0.130
8 K.3
Penyiapan RKK Ls 1.00 0.00 0.25 0.00 - - 0.25 0.001
Sosialisasi, promosi dan pelatihan Ls 1.00 0.00 - - - - - -
Alat Pelindung Kerja dan Alat Pelindung Diri Ls 1.00 0.08 0.56 0.05 0.07 0.006 0.63 0.052
Asuransi dan perizinan Ls 1.00 0.08 - - - - - -
Personel K3 Konstruksi Ls 1.00 0.25 0.07 0.02 - - 0.07 0.017
Fasilitas, sarana dan prasarana kesehatan Ls 1.00 0.02 - - 0.63 0.016 0.63 0.016
Rambu- Rambu yang diperlukan Ls 1.00 0.02 1.00 0.02 - - 1.00 0.017
Konsultasi dengan Ahli terkait Keselamatan Konstruksi Ls 1.00 0.08 - - - - - -
Lain- Lain Terkait Pengendalian Risiko Keselamatan Konstruksi Ls 1.00 0.02 - - - - - -
JUMLAH PEKERJAAN I 1.58 0.98 0.04 1.02
II PEKERJAAN STRUKTUR
1 Pekerjaan Tanah dan Pondasi
Menggali tanah biasa sedalam 1 meter m3 88.00 0.17 88.00 0.17 - - 88.00 0.171
Urugan pasir bawah pondasi, T = 7 cm m3 1.01 0.01 1.01 0.01 - - 1.01 0.006
Lantai kerja, T = 5 cm m3 1.01 0.02 0.72 0.01 - - 0.72 0.013
Urugan Tanah Peninggian Bangunan, T = 150 cm m3 336.00 0.83 - - 157.35 0.388 157.35 0.388
Memadatkan tanah m3 336.00 0.24 - - 157.35 0.115 157.35 0.115
2 Pekerjaan Pondasi
Pekerjaan Tanah dan Pondasi
Pengadaan tiang pancang m1 1,104.00 4.25 1,104.00 4.25 - - 1,104.00 4.251
Pemancangan Tiang Pancang m1 1,092.00 1.24 1,092.00 1.24 - - 1,092.00 1.236
Potong Kepala Tiang Pancang bh 62.00 0.15 62.00 0.15 - - 62.00 0.154
Sambungan Tiang Pancang bh 62.00 0.23 62.00 0.23 - - 62.00 0.227
3 Pekerjaan pilecap -
Pembesian kg 2,019.73 0.56 2,019.73 0.56 - - 2,019.73 0.563
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 8.64 0.21 8.64 0.21 - - 8.64 0.205
Pasang bekisting pondasi pasangan bata ringan m2 42.48 0.13 42.48 0.13 - - 42.48 0.128
4 Pekerjaan Pondasi batu kali -
Mengurug kembali galian tanah m3 27.49 0.02 27.49 0.02 - - 27.49 0.018
Pasir urug m3 6.14 0.04 6.14 0.04 - - 6.14 0.038
Pas batu kosong m3 13.15 0.16 13.15 0.16 - - 13.15 0.159
Pondasi batu kali m3 31.55 0.62 31.55 0.62 - - 31.55 0.621
5 Pekerjaan sloof S1-S3 uk 30x50
Pembesian kg 2,889.66 0.80 2,889.66 0.80 - - 2,889.66 0.805
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 25.14 0.60 25.14 0.60 - - 25.14 0.597
Pasang bekisting untuk sloof (1 x pakai) m2 167.63 0.76 167.63 0.76 - - 167.63 0.765
6 Pekerjaan sloof S4-S6 uk 20x30 cm -
Pembesian kg 1,600.12 0.45 1,600.12 0.45 - - 1,600.12 0.446
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 8.99 0.21 8.99 0.21 - - 8.99 0.213
Pasang bekisting untuk sloof (1 x pakai) m2 89.88 0.41 89.88 0.41 - - 89.88 0.410
JUMLAH PEKERJAAN II 12.11 11.03 0.50 11.53
III PEKERJAAN STRUKTUR ATAS
A LANTAI 1
1 Membuat Beton Struktur Lantai Tb. 12 cm K 225 + Wire Mesh M.10 m3 12.61 0.41 5.05 0.16 - - 5.05 0.163
2 Kolom K1 uk 300x500 mm
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 13.23 0.31 13.23 0.31 - - 13.23 0.314
Pasang bekisting untuk kolom (2 x pakai) m2 141.12 0.57 141.12 0.57 - - 141.12 0.575
Pembesian kg 3,527.93 0.98 3,527.93 0.98 - - 3,527.93 0.983
3 Kolom K2 uk 150x300 mm
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 2.65 0.06 2.65 0.06 - - 2.65 0.063
Pasang bekisting untuk kolom (2 x pakai) m2 70.56 0.29 70.56 0.29 - - 70.56 0.287
Pembesian kg 749.41 0.21 749.41 0.21 - - 749.41 0.209
4 Membuat Beton Struktur KP Kolom 10/10 K 225 Besi 323 kg m3 3.76 0.73 1.13 0.22 0.19 0.037 1.32 0.256
5 Pekerjaan tangga type 1
Membuat Lantai & Trap Tangga Beton K 225 Besi 195,1 kg m3 1.89 0.20 - - 1.89 0.199 1.89 0.199
Membuat Plat Bordes tb. 12 cm Beton K 225 Besi 155,3 kg m3 0.64 0.07 - - 0.64 0.069 0.64 0.069
6 Pekerjaan tangga type 2
Membuat Lantai & Trap Tangga Beton K 225 Besi 195,1 kg m3 1.58 0.17 1.58 0.17 - - 1.58 0.166
Membuat Plat Bordes tb. 12 cm Beton K 225 Besi 155,3 kg m3 0.40 0.04 0.40 0.04 - - 0.40 0.043
B LANTAI 2
1 Membuat Beton Struktur Lantai Tb. 12 cm K 225 menggunakan Bondek + Wire Mesh M.10 m3 34.31 2.02 34.31 2.02 - - 34.31 2.019
2 PEKERJAAN KOLOM LT 2.
Kolom K1 uk 300x500 mm
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 12.60 0.30 12.60 0.30 - - 12.60 0.299
Pasang bekisting untuk kolom (2 x pakai) m2 134.40 0.55 134.40 0.55 - - 134.40 0.547
Pembesian kg 2,953.18 0.82 2,953.18 0.82 - - 2,953.18 0.823
3 Membuat Beton Struktur KP Kolom 10/10 K 225 Besi 323 kg m1 1.70 0.33 1.70 0.33 - - 1.70 0.330
Pekerjaan balok B1-B2 uk 30x55
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 25.26 0.60 25.26 0.60 - - 25.26 0.600
Pasang bekisting untuk balok (2 x pakai) m2 186.55 0.77 186.55 0.77 - - 186.55 0.772
Pembesian kg 5,578.29 1.55 5,578.29 1.55 - - 5,578.29 1.554
4 Pekerjaan balok B3-B6 uk 20x40
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 11.26 0.27 11.26 0.27 - - 11.26 0.267
Pasang bekisting untuk balok (2 x pakai) m2 72.39 0.30 72.39 0.30 - - 72.39 0.300
Pembesian kg 2,590.50 0.72 2,590.50 0.72 - - 2,590.50 0.722
C LANTAI DAK
1 Membuat Beton Struktur Lantai Tb. 12 cm K 225 menggunakan Bondek + Wire Mesh M.10 m3 10.16 0.60 10.16 0.60 - - 10.16 0.598
2 Pekerjaan balok B1-B2 uk 30x55
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 25.08 0.60 25.08 0.60 - - 25.08 0.595
Pasang bekisting untuk balok (2 x pakai) m2 191.65 0.79 191.65 0.79 - - 191.65 0.794
Pembesian kg 4,653.29 1.30 4,653.29 1.30 - - 4,653.29 1.296
3 Pekerjaan balok B3-B6 uk 20x40
Membuat beton Fc = 26,4 Mpa (K-300), slump (122) cm, w/c = 0.52 m3 3.81 0.09 3.81 0.09 - - 3.81 0.090
Pasang bekisting untuk balok (2 x pakai) m2 46.65 0.19 46.65 0.19 - - 46.65 0.193
Pembesian kg 986.70 0.27 986.70 0.27 - - 986.70 0.275
D Pekerjaan Atap
1 Kuda-kuda dan rangka atap baja ringan profil C-75, untuk atap asbes/spandek, bentang 8 s.d. 10 m (garansi 10m2
tahun) 386.05 1.31 - - 247.99 0.840 247.99 0.840
2 Rangka besi hollow 40x40 m2 69.92 0.20 - - - - - -
3 Pasang atap bitumen monolayer selulosa 3 mm motif gelombang asbes (atap pelana)Shade m2 455.98 1.66 - - 123.99 0.452 123.99 0.452
4 Nok Bitumen/ Ridge onduline m2 23.00 0.08 - - - - - -
5 Plashing Beton + Water Proofing SIKA m2 68.39 0.05 - - - - - -
6 Talang BJLS m2 40.19 0.23 - - - - - -
JUMLAH PEKERJAAN III 19.65 15.10 1.60 16.69
IV PEKERJAAN ARSITEKTUR
BOBOT PEKERJAAN
BOBOT
NO. URAIAN SAT. VOL. MINGGU LALU MINGGU INI S/D MINGGU INI
(%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
A Pekerjaan dinding
1 Lantai 1
Pasangan bata ringan tb. 10 cm (20 x 60 cm) m2 888.60 2.68 221.42 0.67 33.67 0.102 255.09 0.770
Pekerjaan Plesteran dengan mortar siap pakai m2 402.71 0.55 - - 118.49 0.163 118.49 0.163
Pekerjaan Acian dengan mortar siap pakai m2 1,892.76 1.42 - - 118.49 0.089 118.49 0.089
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) interior m2 1,892.76 1.56 - - - - - -
Pasang railling/pagar besi hollow galvanis 6x4 cm & 4x4 cm + pengecatan m1 13.92 0.21 - - - - - -
Pasang dinding Homogeneus Tile 60 x 60 cm m2 39.37 0.21 - - - - - -
Pasang dinding roster/terawang (12 x 11 x 24), camp. spesi 1 PC 3 Ps m2 15.68 0.17 - - - - - -
Pasangan Dinding Glasblock 20x20 cm m2 2.92 0.05 - - - - - -
Membuat balok lintel (10 x 15) cm m3 1.25 0.15 0.35 0.04 - - 0.35 0.042
Pasang backdrop type 1 ls 1.00 0.25 - - - - - -
Pasang backdrop type 2 ls 1.00 0.33 - - - - - -
2 Lantai 2
Pasangan bata ringan tb. 10 cm (20 x 60 cm) m2 610.87 1.84 - - 458.15 1.384 458.15 1.384
Pekerjaan Plesteran dengan mortar siap pakai m2 299.32 0.41 - - 29.55 0.041 29.55 0.041
Pekerjaan Acian dengan mortar siap pakai m2 1,221.73 0.92 - - 29.55 0.022 29.55 0.022
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) interior m2 1,221.73 1.01 - - - - - -
Pasang dinding Homogeneus Tile 60 x 60 cm m2 28.69 0.16 - - - - - -
Membuat balok lintel (10 x 15) cm m2 1.46 0.18 - - 0.51 0.062 0.51 0.062
3 Lantai atap
Pasangan bata ringan tb. 10 cm (20 x 60 cm) m2 213.31 0.64 21.33 0.06 171.50 0.518 192.83 0.582
Pekerjaan Plesteran dengan mortar siap pakai m2 356.87 0.49 - - 32.85 0.045 32.85 0.045
Pekerjaan Acian dengan mortar siap pakai m2 356.87 0.27 - - - - - -
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) interior m2 356.87 0.29 - - - - - -
Membuat balok lintel (10 x 15) cm m2 0.55 0.07 - - 0.41 0.050 0.41 0.050
Waterproofing Coating m2 156.19 0.20 - - - - - -
Screed Protect Water Proofing m2 156.19 0.66 - - - - - -
tangga pipa stainless stel m2 2.70 0.04 - - - - - -
B Pekerjaan lantai
Lantai 1
Homogenous tile 60x60 polished (HT-01) m2 447.66 2.43 - - - - - -
Homogenous tile 60x60 unpolished (HT-02) m2 37.03 0.20 - - - - - -
Pasang plint lantai rumah rumah sakit L605 R3 = 60cm x 5cm x 5cm m1 331.34 0.99 - - - - - -
Lantai 2
Homogenous tile 60x60 polished (HT-01) m2 256.41 1.39 - - - - - -
Homogenous tile 60x60 unpolished (HT-02) m2 3.47 0.02 - - - - - -
Pasang plint lantai rumah rumah sakit L605 R3 = 60cm x 5cm x 5cm m1 168.00 0.50 - - - - - -
Waterproofing Coating KM + Talang m2 28.67 0.04 - - - - - -
Screed Protect Water Proofing + Talang m2 25.20 0.11 - - - - - -
C Pekerjaan langit-langit
Lantai 1
Langit-langit PVC Board lb, 25 cm tb. 8 mm + rangka hollow uk 40/40 (60 x 120 cm) m2 514.45 2.78 - - - - - -
List plafond m1 574.46 0.29 - - - - - -
Lantai 2
Langit-langit PVC Board lb, 25 cm tb. 8 mm + rangka hollow uk 40/40 (60 x 120 cm) m2 292.79 1.58 - - - - - -
List plafond m1 377.20 0.19 - - - - - -
D Pekerjaan kusen pintu dan jendela
Lantai 1
Pintu type P1 bh 2.00 0.50 - - - - - -
Pintu type P2 bh 7.00 0.93 - - - - - -
Pintu type P3 bh 6.00 0.70 - - - - - -
Pintu type P4 bh 11.00 0.91 - - - - - -
Pintu type P5 bh 5.00 0.29 - - - - - -
Pintu type P6 bh 1.00 0.12 - - - - - -
Pintu type P7 bh 1.00 0.27 - - - - - -
Pintu difabel (PD) bh 1.00 0.12 - - - - - -
Pintu geser (PG) bh 2.00 0.15 - - - - - -
Pintu type PP bh 1.00 0.07 - - - - - -
Pintu type PB bh 2.00 0.13 - - - - - -
Pintu type PQ bh 1.00 0.12 - - - - - -
Jendela J1 bh 1.00 0.07 - - - - - -
Jendela J6 bh 6.00 0.37 - - - - - -
Jendela J7 bh 1.00 0.28 - - - - - -
Jendela J8 bh 1.00 0.03 - - - - - -
Jendela BV1 bh 5.00 0.17 - - - - - -
Jendela BV 2 bh 8.00 0.08 - - - - - -
Lantai 2
Pintu type P2 bh 1.00 0.13 - - - - - -
Pintu type P3 bh 5.00 0.58 - - - - - -
Pintu type P4 bh 4.00 0.33 - - - - - -
Pintu type P5 bh 3.00 0.17 - - - - - -
Jendela J2 bh 1.00 0.20 - - - - - -
Jendela J3 bh 2.00 0.17 - - - - - -
Jendela J4 bh 4.00 0.29 - - - - - -
Jendela J5 bh 1.00 0.06 - - - - - -
Jendela J6 bh 5.00 0.31 - - - - - -
Jendela BV1 bh 1.00 0.03 - - - - - -
Jendela BV 2 bh 9.00 0.09 - - - - - -
E Pekerjaan Sanitary
Lantai 1
Pemasangan kloset duduk/monoblok Toto CW637J/SW637JP bh 5.00 0.42 - - - - - -
Pemasangan kloset duduk difabel bh 1.00 0.12 - - - - - -
Pemasangan wastafel bh 16.00 0.66 - - - - - -
Pegangan Aluminium m1 3.87 0.02 - - - - - -
Pemasangan Floor drain bh 6.00 0.01 - - - - - -
Pemasangan Kran 1/2 '' Stainless Steel bh 5.00 0.01 - - - - - -
Pemasangan Service Sink TOTO SK 322 lengkap dengan kran dan aksesoris bh 2.00 0.50 - - - - - -
Lantai 2 -
Pemasangan kloset duduk/monoblok Toto CW637J/SW637JP bh 2.00 0.17 - - - - - -
Wastafel bh 1.00 0.04 - - - - - -
Floor drain bh 3.00 0.01 - - - - - -
Pemasangan Kran 1/2 '' Stainless Steel bh 5.00 0.01 - - - - - -
Lantai Rooftop -
Roof drain bh 22.00 0.13 - - - - - -
F Pekerjaan Fasade -
Ornamen Kawung, Pasang Aluminium Composite Panel (ACP) 0,5 mm PVDF rangka besi hollow aluminium
m2 50.84 1.27 - - - - -
40.40 mm (60 x 120 cm) + Laser Cutting -
Canopy, Pasang Aluminium Composite Panel (ACP) 0,5 mm PVDF rangka besi hollow aluminium 40.40 mm
m2 162.81 3.51 - - - - -
(60 x 120 cm) -
Pasang signage tulisan Puskesmas Laladon ls 1.00 0.25 - - - - - -
Pasang signage logo Kemenkes ls 1.00 0.17 - - - - - -
JUMLAH PEKERJAAN IV 40.26 0.78 2.48 3.25
V PEKERJAAN INFRASTRUKTUR
1 Pasang paving blok tebal 8 cm type cacing m2 262.00 1.18 - - - - - -
2 Perkerasan beton m3 23.70 0.59 - - - - - -
3 Pasang kanstin beton 60 x 25 x 22 m1 96.00 0.20 - - - - - -
4 Pasang car stopper bh 2.00 0.01 - - - - - -
5 Pekerjaan pemasangan saluran U-ditch 400x400 m1 121.00 1.12 - - - - - -
6 Pekerjaan pemasangan penutup saluran U-ditch 400x400 m1 121.00 0.55 - - - - - -
7 Memasang bak kontrol pas. Bata ukuran (60x60) cm tinggi 65 cm dengan tutup beton bh 18.00 0.15 - - - - - -
BOBOT PEKERJAAN
BOBOT
NO. URAIAN SAT. VOL. MINGGU LALU MINGGU INI S/D MINGGU INI
(%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
8 Memasang rumput gajah mini m2 95.18 0.08 - - - - - -
9 TPS
Menggali tanah biasa sedalam 1 meter m3 8.75 0.02 - - - - - -
Memadatankan tanah (per 20 cm) m3 0.61 0.00 - - - - - -
Mengurug pasir urug m3 0.44 0.00 - - - - - -
Memasang batu kosong (anstamping) m3 1.31 0.02 - - - - - -
Memasang pondasi batu belah, 1/4 pc 1 kp 4 ps m3 3.50 0.07 - - - - - -
Membuat Beton Struktur SL3 K 225 Sloof 15/20 Besi 228,1 kg m3 0.38 0.05 - - - - - -
Membuat Plat Lantai tb. 12 cm Beton K 225 Besi 141,6 kg m3 1.17 0.12 - - - - - -
Pasangan bata merah tebal 1/2 bata, camp. spesi 1 pc 3 kp 10 ps m2 46.91 0.14 - - - - - -
Kolom praktis m1 19.20 0.04 - - - - - -
Keramik dinding 40x40 m2 27.84 0.14 - - - - - -
Plesteran ciprat / kamprot 1 pc 2 ps m2 14.72 0.02 - - - - - -
Pekerjaan Plesteran dengan mortar siap pakai m2 51.27 0.07 - - - - - -
Pekerjaan Acian dengan mortar siap pakai m2 51.27 0.04 - - - - - -
Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) exterior m2 51.27 0.06 - - - - - -
Pekerjaan balok lintel m1 12.50 0.03 - - - - - -
Membuat Plat Dak tb. 10 cm Beton K 225 Besi 101,9 kg m3 0.98 0.11 - - - - - -
Membuat Plat Topian tb. 10 cm Beton K 225 Besi 115,1 kg m3 0.34 0.04 - - - - - -
Coating Waterproofing m2 9.76 0.02 - - - - - -
Pintu m2 5.61 0.07 - - - - - -
10 Pasang Pagar type 1
Pondasi batu kali m3 7.25 0.14 3.69 0.07 1.81 0.036 5.50 0.108
Sloof m3 1.86 0.23 0.75 0.09 0.30 0.038 1.05 0.133
Pasangan bata tembok m2 65.42 0.19 0.75 0.00 6.75 0.020 7.50 0.022
Plesteran m2 130.84 0.18 - - 13.50 0.019 13.50 0.019
Acian m2 130.84 0.12 - - 13.50 0.013 13.50 0.013
Pengecatan m2 130.84 0.15 - - - - - -
Besi hollow 40x60 dan 40x40 m2 62.40 0.52 - - 10.12 0.084 10.12 0.084
Membuat Beton Struktur Kolom 20/30 K 225 Besi 94 kg m2 2.25 0.26 1.91 0.22 1.91 0.224 3.83 0.448
Siaran Pasangan Batu Kali m2 39.13 0.06 - - - - - -
11 Pasang Pagar type 2
Galian pondasi m3 33.60 0.07 29.33 0.06 - - 29.33 0.057
Pasir urug m3 2.45 0.02 2.42 0.02 - - 2.42 0.015
Pas batu kosong m3 7.35 0.09 5.18 0.06 - - 5.18 0.063
Pondasi batu kali m3 25.20 0.50 18.11 0.36 - - 18.11 0.356
Sloof m3 2.10 0.27 - - - - - -
Tiang Panel bh 30.00 0.25 23.00 0.19 - - 23.00 0.191
Pagar panel bh 140.00 0.58 110.00 0.46 - - 110.00 0.457
Gerbang type A m2 13.51 0.34 - - - - - -
Gerbang type B m2 10.99 0.27 - - - - - -
12 Pekerjaan GWT
galian tanah m3 51.89 0.10 - - - - - -
tanah dipadatkan m3 0.70 0.00 - - - - - -
pasir padat m3 0.70 0.00 - - - - - -
lantai kerja m3 0.50 0.01 - - - - - -
sloof 25x50 m3 1.19 0.13 - - - - - -
plat lantai m3 2.29 0.23 - - - - - -
kolom 20x20 m3 0.56 0.07 - - - - - -
balok praktis 20x50 m3 1.60 0.22 - - - - - -
dinding plat beton m3 5.69 0.69 - - - - - -
waterproofing m2 49.24 0.10 - - - - - -
plat atas m3 2.88 0.31 - - - - - -
tangga pipa stainless stel m2 8.80 0.12 - - - - - -
13 Pekerjaan Rumah Genset
Galian tanah m3 0.77 0.00 - - - - - -
pondasi bata rollag m2 5.10 0.01 - - - - - -
Membuat Plat Lantai tb. 12 cm Beton K 225 Besi 141,6 kg m3 2.48 0.25 - - - - - -
wiremesh m10 m2 42.50 0.07 - - - - - -
rangka atap dan penutup atap m2 15.92 0.05 - - - - - -
penutup atap m2 15.92 0.04 - - - - - -
Galian untuk IPAL
Galian tanah m3 6.72 0.01 - - - - - -
lantai kerja m3 0.47 0.01 - - - - - -
urugan kembali galian tanah m3 0.89 0.00 - - - - - -
kabel sling kg 2.25 0.01 - - - - - -
Manhole cover bh 3.00 0.01 - - - - - -
JUMLAH PEKERJAAN V 11.60 1.53 0.43 1.96
VI PEKERJAAN ELEKTRIKAL
A Penyambungan Daya Listrik
1 Penyambungan Daya Listrik PLN 41.5 kWh Va 41,500.00 0.71 5,000.00 0.09 - - 5,000.00 0.086
2 Sertifikat Layak Operasi Va 41,500.00 0.07 5,000.00 0.01 - - 5,000.00 0.009

B PANEL
Lantai 1
1 PANEL P-UTAMA unit 1.00 0.17 - - - - - -
2 PANEL P-L1 unit 1.00 0.10 - - - - - -
3 PANEL P.G-L1 unit 1.00 0.10 - - - - - -
4 PANEL P.POMPA unit 1.00 0.04 - - - - - -
5 PANEL P.IPAL unit 1.00 0.04 - - - - - -
Lantai 2
1 PANEL P-L2 unit 1.00 0.10 - - - - - -
2 PANEL P.G-L2 unit 1.00 0.10 - - - - - -
C KABEL TEGANGAN RENDAH
1 Dari Panel P-UTAMA menuju Panel P.G-L1, NYY 4x16 mm2 + NYA 10 mm2 m 38.22 0.19 - - - - - -
2 Dari Panel P-UTAMA menuju Panel P-L1, NYY 4x6 mm2 + NYA 6 mm2 m 8.00 0.02 - - - - - -
3 Dari Panel P-UTAMA menuju Panel P-POMPA, NYY 3x4 mm2 m 23.00 0.04 - - - - - -
4 Dari Panel P-UTAMA menuju Panel P-IPAL, NYY 3x4 mm2 m 23.00 0.04 - - - - - -
5 Dari Panel P-UTAMA menuju Panel P.G-L2, NYY 4x10 mm2 + NYA 10 mm2 m 21.00 0.07 - - - - - -
6 Dari Panel P-UTAMA menuju Panel P-L2, NYY 4x6 mm2 + NYA 6 mm2 m 21.00 0.05 - - - - - -
7 Dari Panel P-UTAMA menuju Panel GENSET, NYY 4x35 mm2 + NYA 16 mm2 m 45.00 0.30 - - - - - -
D KABEL LADDER DAN TRAY
Termasuk suport, hanger serta material pendukungnya.
Lantai 1
1 W = 300, H = 100 (Elektrikal) m 48.00 0.28 - - - - - -
2 W = 200, H = 100 (Elektronik) m 46.00 0.19 - - - - - -
Lantai 2
1 W = 300, H = 100 (Elektrikal) m 24.00 0.14 - - - - - -
2 W = 200, H = 100 (Elektronik) m 26.00 0.11 - - - - - -
E INSTALASI LAMPU PENERANGAN DAN STOP KONTAK
Lantai 1
1 Lampu RM LED 2x18 W white 1200 mm bh 73.00 0.61 - - - - - -
2 Downlight LED 12 W white bh 3.00 0.01 - - - - - -
3 Downlight LED BULB 12 W E-27 white bh 18.00 0.04 - - - - - -
4 Exit Lamp 5 W + battere bh 4.00 0.03 - - - - - -
5 Lampu Taman t=2m 23 W Outbow bh 9.00 0.22 - - - - - -
6 Saklar Tunggal bh 13.00 0.02 - - - - - -
7 Saklar Ganda bh 25.00 0.03 - - - - - -
8 Stop Kontak 1 phase bh 81.00 0.10 - - - - - -
9 Stop Kontak AC 1 phase bh 17.00 0.03 - - - - - -
10 Instalasi penerangan, kabel NYM 3 x 2,5 mm2 ttk 107.00 0.62 - - - - - -
BOBOT PEKERJAAN
BOBOT
NO. URAIAN SAT. VOL. MINGGU LALU MINGGU INI S/D MINGGU INI
(%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
+ pipa hight impact conduit diameter 20 mm2
11 Instalasi stop kontak, kabel NYM 3 x 2,5 mm2 ttk 98.00 0.57 - - - - - -
+ pipa hight impact conduit diameter 20 mm2
Lantai 2
1 Lampu RM LED 2x18 W white 1200 mm bh 49.00 0.41 - - - - - -
2 Downlight LED 12 W white
3 Downlight LED BULB 12 W E-27 white bh 3.00 0.01 - - - - - -
4 Exit Lamp 5 W + battere m2 1.00 0.01 - - - - - -
5 Saklar Tunggal bh 7.00 0.01 - - - - - -
6 Saklar Ganda bh 8.00 0.01 - - - - - -
7 Stop Kontak dinding 1 phase bh 43.00 0.05 - - - - - -
8 Stop Kontak AC 1 phase bh 9.00 0.01 - - - - - -
9 Stop Kontak lantai 1 phase bh 6.00 0.07 - - - - - -
10 Instalasi penerangan, kabel NYM 3 x 2,5 mm2 ttk 53.00 0.31 - - - - - -
+ pipa hight impact conduit diameter 20 mm2
11 Instalasi stop kontak, kabel NYM 3 x 2,5 mm2 ttk 58.00 0.34 - - - - - -
+ pipa hight impact conduit diameter 20 mm2
F INSTALASI PETIR DAN PENTANAHAN
1 Splitzen (tombak atas) bh 5.00 0.02 - - - - - -
- bahan tembaga diameter 3/4 Panjang 30cm
2 Pipa Galvanis diameter 3/4 Panjang 60 cm unit 5.00 0.01 - - - - - -
3 Kabel NYY 1X50mm2 m 81.00 0.18 - - - - - -
4 Fitting - Fitting + Klem kabel ls 1.00 0.00 - - - - - -
5 Arde Grounding + Control Box 400 x 400 x 400 bh 2.00 0.02 - - - - - -
Concreate bak kontrol w/ Bordess plate door + lock
6 Grounding (Pentanahan) untuk Panel Listrik unit 1.00 0.01 - - - - - -
7 Grounding (Pentanahan) untuk elektronik unit 1.00 0.01 - - - - - -
G PEKERJAAN FIRE ALARM
Peralatan Utama Fire Alarm
Pengadaan dan pemasangan Peralatan Utama Fire Alarm, lengkap terpasang
dengan alat bantu lainnya sesuai gambar perencanaan dan spesifikasi teknis
1 Master control fire alarm (MCFA) tipe Conventional unit 1.00 0.05 - - - - - -
Kapasitas 5 zone
Pekerjaan Instalasi Fire Alarm
Pengadaan dan pemasangan instalasi Fire Alarm lengkap terpasang fixture
dengan alat bantu lainnya sesuai dengan gambar perencanaan dan spesifikasi teknis
Lantai 1
1 Terminal box FA (include Module) unit 1.00 0.01 - - - - - -
2 Smoke detector (photoelectric) bh 25.00 0.12 - - - - - -
3 End of line bh 2.00 0.01 - - - - - -
4 Alarm Bell bh 2.00 0.01 - - - - - -
5 Lampu Indikator bh 2.00 0.00 - - - - - -
6 Manual Push Button bh 2.00 0.00 - - - - - -
7 Installasi detector, NYA 2 x 1,5 mm2 ttk 25.00 0.12 - - - - - -
(In Conduit PVC, Dia 20mm2)
8 Installasi Manual Push Button,alarm bell dan lampu indikator, FRC 2 x 1,5 mm2 ttk 2.00 0.01 - - - - - -
(In Conduit PVC, Dia 20mm2)
Lantai 2
1 Terminal box FA (include Module) unit 1.00 0.01 - - - - - -
2 Smoke detector (photoelectric) bh 14.00 0.07 - - - - - -
3 Heat detector bh 1.00 0.01 - - - - - -
4 End of line bh 1.00 0.00 - - - - - -
5 Alarm Bell bh 1.00 0.00 - - - - - -
6 Lampu Indikator bh 1.00 0.00 - - - - - -
7 Manual Push Button bh 1.00 0.00 - - - - - -
8 Installasi detector, NYA 2 x 1,5 mm2 ttk 15.00 0.07 - - - - - -
(In Conduit PVC, Dia 20mm2)
9 Installasi Manual Push Button,alarm bell dan lampu indikator, FRC 2 x 1,5 mm2 ttk 2.00 0.01 - - - - - -
(In Conduit PVC, Dia 20mm2)
H PEKERJAAN TATA SUARA
Peralatan Utama Tata Suara
Pengadaan dan pemasangan Peralatan Utama Tata Suara, lengkap terpasang
dengan alat bantu lainnya sesuai gambar perencanaan dan spesifikasi teknis
Speaker Selector 5 channel
1 Power Amplifier 240 W unit 1.00 0.08 - - - - - -
2 Recorded Voice Evacuation unit 1.00 0.13 - - - - - -
3 MDF-SS bh 1.00 0.14 - - - - - -
4 Paging Microphone bh 1.00 0.03 - - - - - -
5 Speaker Selector 5 channel bh 1.00 0.03 - - - - - -
6 Audio Rack System bh 1.00 0.05 - - - - - -
Pekerjaan Instalasi Tata Suara
Pengadaan dan pemasangan instalasi Tata Suara lengkap terpasang fixture - fixture
dengan alat bantu lainnya sesuai dengan gambar perencanaan dan spesifikasi teknis
Siteplan
1 Terminal box TBTS-S unit 1.00 0.00 - - - - - -
2 Horn Speaker 15 W unit 3.00 0.02 - - - - - -
3 Installasi Tata Suara Horn speaker, NYMHY 2 x 1,5 mm2 ttk 3.00 0.01 - - - - - -
(In Conduit PVC, Dia 20mm2)
4 Pengkabelan dari Amplifier ke TBTS-1, NYY 3 x 2,5 mm2 m 14.00 0.02 - - - - - -
(In Conduit PVC, Dia 20mm2)
Lantai 1
1 Terminal box TBTS-1 unit 1.00 0.00 - - - - - -
2 Ceiling Speaker 6 W unit 20.00 0.08 - - - - - -
3 Installasi Tata Suara, NYMHY 2 x 1,5 mm2 ttk 20.00 0.05 - - - - - -
(In Conduit PVC, Dia 20mm2)
4 Pengkabelan dari Amplifier ke TBTS-1, NYY 3 x 2,5 mm2 m 15.00 0.02 - - - - - -
(In Conduit PVC, Dia 20mm2)
Lantai 2
1 Terminal box TBTS-2 unit 1.00 0.00 - - - - - -
2 Ceiling Speaker 6 W unit 13.00 0.05 - - - - - -
3 Installasi Tata Suara, NYMHY 2 x 1,5 mm2 ttk 13.00 0.03 - - - - - -
(In Conduit PVC, Dia 20mm2)
4 Pengkabelan dari Amplifier ke TBTS-1, NYY 3 x 2,5 mm2 m 24.00 0.04 - - - - - -
(In Conduit PVC, Dia 20mm2)
(In Conduit PVC, Dia 20mm2)
I PEKERJAAN TELEPON
Peralatan Utama Telepon
Pengadaan dan pemasangan Peralatan Utama Telepon, lengkap terpasang
dengan alat bantu lainnya sesuai gambar perencanaan dan spesifikasi teknis
1 PABX with capacity 6 line PTT 16 extention unit 1.00 0.17 - - - - - -
2 Operator console unit 1.00 0.05 - - - - - -
Pekerjaan Instalasi Telepon
Pengadaan dan pemasangan instalasi Telepon lengkap terpasang fixture - fixture
dengan alat bantu lainnya sesuai dengan gambar perencanaan dan spesifikasi teknis
Lantai 1
1 TBTE bh 1.00 0.01 - - - - - -
2 Outlet Telepon RJ 11 bh 9.00 0.02 - - - - - -
3 Handset Analog Telepon bh 9.00 0.04 - - - - - -
4 Installasi Telepon, ITC 2x2x0,6mm2 ttk 9.00 0.02 - - - - - -
(In Conduit PVC, Dia 20mm2)
Lantai 2
BOBOT PEKERJAAN
BOBOT
NO. URAIAN SAT. VOL. MINGGU LALU MINGGU INI S/D MINGGU INI
(%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
1 TBTE bh 1.00 0.01 - - - - - -
2 Outlet Telepon RJ 11 bh 5.00 0.01 - - - - - -
3 Handset Analog Telepon bh 5.00 0.02 - - - - - -
4 Installasi Telepon, ITC 2x2x0,6mm2 ttk 5.00 0.01 - - - - - -
(In Conduit PVC, Dia 20mm2)
J PEKERJAAN DATA
Peralatan Utama Data
Pengadaan dan pemasangan Peralatan Utama Data, lengkap terpasang
dengan alat bantu lainnya sesuai gambar perencanaan dan spesifikasi teknis
1 Server
2 Software
3 Switch HUB 24 port
4 Personal Computer
Rack server
Pekerjaan Instalasi Data
Pengadaan dan pemasangan instalasi Data lengkap terpasang fixture - fixture
dengan alat bantu lainnya sesuai dengan gambar perencanaan dan spesifikasi teknis
Lantai 1
Switch Hub 8 port managed
Outlet Data RJ 45 bh 3.00 0.01 - - - - - -
Wall Mount Rack Cabinet 4U + Swing Frame bh 1.00 0.17 - - - - - -
Installasi Data & access point, UTP CAT 6 + conduit ttk 3.00 0.01 - - - - - -
(In Conduit PVC, Dia 20mm2)
Lantai 2
Switch Hub 24 port managed
Outlet Data RJ 45 bh 13.00 0.03 - - - - - -
Wireless Access Point ceiling mounted bh 5.00 0.15 - - - - - -
Wall Mount Rack Cabinet 4U + Swing Frame bh 1.00 0.17 - - - - - -
Installasi Data & access point, UTP CAT 6 + conduit ttk 18.00 0.04 - - - - - -
(In Conduit PVC, Dia 20mm2)
K PEKERJAAN CCTV
Pengadaan dan pemasangan Peralatan Utama CCTV, lengkap terpasang
dengan alat bantu lainnya sesuai gambar perencanaan dan spesifikasi teknis
Digital Video Recorder 16 Channel 5 mp
TV Monitor LED 32 + support wall mounted
Power Supply CCTV
L PERALATAN CCTV DAN INSTALASI
Pengadaan dan pemasangan peralatan CCTV lengkap terpasang fixture - fixture
dengan alat bantu lainnya sesuai dengan gambar perencanaan dan spesifikasi teknis
Lantai 1
Camera Bullet fixed 5 MP, infra red, outdoor day&night
Camera Dome fixed 5 MP, infra red
Instalasi CCTV, kabel coaxial RG 59 + kabel power ttk 11.00 0.05 - - - - - -
(In Conduit PVC, Dia 20mm2)
Lantai 2
Camera Dome fixed 5 MP, infra red
Instalasi CCTV, kabel coaxial RG 59 + kabel power ttk 5.00 0.02 - - - - - -
(In Conduit PVC, Dia 20mm2)
M PEKERJAAN PEMADAM KEBAKARAN
1 Fire Extinguiser 5 Kg
JUMLAH PEKERJAAN VI 8.95 0.09 - 0.09
VII PEKERJAAN PLUMBING
A Penyambungan Air PDAM Ls 1.00 0.24 - - - - - -
B PERALATAN UTAMA
1 Pompa Transfer (air Bersih) TP.1 Unit 1.00 0.08 - - - - - -
kapasitas 50 lpm
head 40 m
power 500 W / 220 V / 1 Ph / 50 Hz
2 Pompa Sumur (air Bersih) SP.1 Unit 1.00 0.18 - - - - - -
kapasitas 35 lpm
head 60 m
power 600 W / 220 V / 1 Ph / 50 Hz
3 Pompa Booster BP.(1,2) Unit 1.00 0.25 - - - - - -
(sementara dipasang 1 pompa)
model Booster Pump
kapasitas 75 lpm
head 30 m
power 1,1 kW / 380 V / 3Ph / 50 Hz
4 Roof Tank unit 2.00 0.13 - - - - - -
kapasitas 1,500 liter
material Glass-Fibre
5 Torn Air unit 1.00 0.16 - - - - - -
kapasitas 3000 liter
material Glass-Fibre
6 IPAL Domestik (Septic tank) unit 1.00 0.50 - - - - - -
Pengadaan dan Pemasangan & Accessories
Jenis jenis tabung Fiber menggunakan sistem Biofilter Anaerob Aerob
Kapasitas 3 m3/hari
Pompa silent blower
Pompa Backwash
Control Panel semi auto (1 phase)
Bubuk Bakteri
7 IPAL Laboratorium/Medis unit 1.00 0.17 - - - - - -
Jenis jenis tabung Fiber menggunakan sistem Biofilter Anaerob Aerob
Kapasitas 1 m3/hari
2 pcs mikro filter
1 control panel box
1 set UV lamp
2 unit submersible pump
2 unit blower pump
1 set honeycomb + bubuk bakteri
1 set klorin
C INSTALASI AIR BERSIH
Pengadaan dan pemasangan Instalasi Air Bersih termasuk Fitting, material bantu
dan accesories pendukungnya sesuai gambar perencanaan dan spesifikasi teknis.
Site plan
1 Pipa Air Bersih PPR 10
Pipa dia 11/4 Inch m 53.00 0.05 - - - - - -
Pipa dia 1 Inch m 4.00 0.00 - - - - - -
Pipa dia 3/4 Inch m 75.00 0.04 - - - - - -
Pipa dia 1/2 Inch m 25.00 0.01 - - - - - -
Fitting & Accessories ls 1.00 0.01 - - - - - -
Lantai 1
1 Gate valve
Dia 11/4 Inch bh 1.00 0.01 - - - - - -
Dia 3/4 Inch bh 6.00 0.03 - - - - - -
Pipa Air Bersih PPR 10
Pipa Dia 11/4 Inch m 8.00 0.01 - - - - - -
Pipa Dia 1 Inch m 14.00 0.01 - - - - - -
Pipa Dia 3/4 Inch m 51.00 0.03 - - - - - -
Pipa Dia 1/2 Inch m 57.00 0.02 - - - - - -
BOBOT PEKERJAAN
BOBOT
NO. URAIAN SAT. VOL. MINGGU LALU MINGGU INI S/D MINGGU INI
(%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
Fitting & Accessories ls 1.00 0.01 - - - - - -
Lantai 2
1 Gate valve
Dia 1 Inch bh 1.00 0.01 - - - - - -
Dia 3/4Inch bh 2.00 0.01 - - - - - -
2 Pipa Air Bersih PPR 10
Pipa Dia 1 Inch m 9.00 0.01 - - - - - -
Pipa Dia 3/4 Inch m 11.00 0.01 - - - - - -
Pipa Dia 1/2 Inch m 19.00 0.01 - - - - - -
Fitting & Accessories ls 1.00 0.01 - - - - - -
Lantai atap
1 Gate valve
Dia 11/2 Inch bh 3.00 0.02 - - - - - -
Dia 11/4 Inch bh 4.00 0.03 - - - - - -
2 Pipa Air Bersih PPR 10
Pipa Header Dia 2 Inch set 1.00 0.00 - - - - - -
Pipa Dia 11/2 Inch m 10.00 0.02 - - - - - -
Pipa Dia 11/4 Inch m 8.00 0.01 - - - - - -
Fitting & Accessories ls 1.00 0.01 - - - - - -
D INSTALASI AIR KOTOR, AIR BEKAS, VENTILASI -
Pengadaan dan pemasangan Instalasi Air Kotor, Air Bekas, Ventilasi termasuk Fitting, material bantu -
dan accesories pendukungnya sesuai gambar perencanaan dan spesifikasi teknis. -
Site plan -
1 Pipa air kotor, PVC class 10 kg/cm2 (AW) -
Pipa Dia 4 Inch m 38.00 0.09 36.00 0.09 - - 36.00 0.090
2 Pipa air bekas, PVC class 10 kg/cm2 (AW)
Pipa Dia 3 Inch m 47.00 0.05 36.00 0.04 - - 36.00 0.042
Fitting & Accessories ls 1.00 0.00 - - - - - -
Lantai 1
1 Pipa air kotor, PVC class 10 kg/cm2 (AW)
Pipa Dia 4 Inch m 20.00 0.05 - - - - - -
2 Pipa air bekas, PVC class 10 kg/cm2 (AW)
Pipa Dia 21/2 Inch m 14.00 0.01 - - - - - -
Pipa Dia 2 Inch m 26.00 0.02 - - - - - -
Fitting & Accessories ls 1.00 0.00 - - - - - -
3 Pipa air venting, PVC class 10 kg/cm2 (AW)
Pipa Dia 2 Inch m 36.00 0.03 - - - - - -
Pipa Dia 11/4 Inch m 48.00 0.03 - - - - - -
Fitting & Accessories ls 1.00 0.00 - - - - - -
4 Floor drain bh 6.00 0.02 - - - - - -
Lantai 2
1 Pipa air kotor, PVC class 10 kg/cm2 (AW)
Pipa Dia 4 Inch m 6.00 0.01 - - - - - -
2 Pipa air bekas, PVC class 10 kg/cm2 (AW)
Pipa Dia 21/2 Inch m 3.00 0.00 - - - - - -
Pipa Dia 2 Inch m 7.00 0.01 - - - - - -
Fitting & Accessories ls 1.00 0.00 - - - - - -
3 Pipa air venting, PVC class 10 kg/cm2 (AW)
Pipa Dia 2 Inch m 12.00 0.01 - - - - - -
Pipa Dia 11/4 Inch m 18.00 0.01 - - - - - -
Fitting & Accessories ls 1.00 0.00 - - - - - -
4 Floor drain bh 2.00 0.01 - - - - - -
Dalam shaft / vertikal
1 Pipa air kotor, PVC class 10 kg/cm2 (AW)
Pipa Dia 4 Inch m 8.00 0.02 - - - - - -
2 Pipa air bekas, PVC class 10 kg/cm2 (AW)
Pipa Dia 21/2 Inch m 8.00 0.01 - - - - - -
3 Pipa air venting, PVC class 10 kg/cm2 (AW)
Pipa Dia 21/2 Inch m 8.00 0.01 - - - - - -
Fitting & Accessories ls 1.00 0.00 - - - - - -
E INSTALASI AIR HUJAN
Pengadaan dan pemasangan Instalasi Air Hujan termasuk Fitting, material bantu dan accesories
pendukungnya sesuai gambar perencanaan dan spesifikasi teknis.
1 Pipa air hujan, PVC class 10 kg/cm2 (AW)
Pipa Dia 6 Inch m 52.00 0.17 - - - - - -
Pipa Dia 4Inch m 155.00 0.39 - - - - - -
Fitting & Accessories ls 1.00 0.01 - - - - - -
2 Roof Drain Dia 4 Inch bh 9.00 0.05 - - - - - -
F PEKERJAAN TATA UDARA
Lantai 1
Peralatan AC
Pengadaan dan pemasangan unit AC lengkap terpasang dengan material pendukung
(Gas Freon, dudukan Unit, dll)
1 IU/OU.AC-1.1, IU/OU.AC-1.2 unit 2.00 0.25 - - - - - -
Split Wall
12.000 btu/h 1,5 PK
2 IU/OU.AC-1.3, IU/OU.AC-1.4, IU/OU.AC-1.5 unit 2.00 0.20 - - - - - -
Split Wall
9.000 btu/h 1 PK
3 IU/OU.AC-1.6 unit 1.00 0.08 - - - - - -
Split Wall
5.000 btu/h 1/2 PK
4 IU/OU.AC-1.7, IU/OU.AC-1.8, IU/OU.AC-1.9, IU/OU.AC-1.10 unit 3.00 0.30 - - - - - -
Split Wall
7.000 btu/h 3/4 PK
5 IU/OU.AC-1.11 unit 1.00 0.12 - - - - - -
Split Wall
12.000 btu/h 1,5 PK
6 IU/OU.AC-1.12, IU/OU.AC-1.13, IU/OU.AC-1.14, IU/OU.AC-1.15, IU/OU.AC-1.16 unit 3.00 0.30 - - - - - -
Split Wall
9.000 btu/h 1 PK
7 IU/OU.AC-1.17 unit 1.00 0.10 - - - - - -
Split Wall
7.000 btu/h 3/4 PK
Peralatan Fan
Pengadaan dan pemasangan unit Fan lengkap terpasang dengan material pendukung
lainnya
1 EF-1.1, EF-1.2, EF-1.3, EF-1.4, EF-1.5, EF-1.6 unit 6.00 0.06 - - - - - -
Ceiling fan 8 Inch
100 CFM
30 W / 220 V / 1 Ph / 50 Hz
2 EF-1.7 unit 1.00 0.02 - - - - - -
Axial
300 CFM
50 W / 220 V / 1 Ph / 50 Hz
3 EF-1.8 unit 1.00 0.04 - - - - - -
Axial
400 CFM
50 W / 220 V / 1 Ph / 50 Hz
4 Ducting fan m3 32.00 0.11 - - - - - -
BJLS -
BOBOT PEKERJAAN
BOBOT
NO. URAIAN SAT. VOL. MINGGU LALU MINGGU INI S/D MINGGU INI
(%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)
Pipa Drain -
5 Pemipaan Drain bahan pipa PVC Class AW 10 kg/cm lengkap -
Isolasi, fitting dan material bantu lainnya. -
Pipa Dia 1/2 Inch m 85.00 0.06 - - - - - -
6 Pipa Refrigerant
Pemipaan Refrigerant AC bahan pipa tembaga lengkap
Isolasi, fitting dan material bantu lainnya.
Pipa Refrigerant
Pipa Dia 6,4 mm m 136.00 0.32 - - - - - -
Pipa Dia 12,7 mm m 136.00 0.36 - - - - - -
Lantai 2
Peralatan Fan
Pengadaan dan pemasangan unit Fan lengkap terpasang dengan material pendukung
lainnya
1 EF-2.1, EF-2.2, EF-2.3 unit 3.00 0.03 - - - - - -
Ceiling fan 8 Inch
100 CFM
30 W / 220 V / 1 Ph / 50 Hz
Pipa Drain
2 Pemipaan Drain bahan pipa PVC Class AW 10 kg/cm lengkap
Isolasi, fitting dan material bantu lainnya.
Pipa Dia 1/2 Inch m 81.00 0.05 - - - - - -
3 Pipa Refrigerant
Pemipaan Refrigerant AC bahan pipa tembaga lengkap
Isolasi, fitting dan material bantu lainnya.
Pipa Refrigerant
Pipa Dia 6,4 mm m 72.00 0.17 - - - - - -
Pipa Dia 12,7 mm m 72.00 0.19 - - - - - -
JUMLAH PEKERJAAN VII 5.86 0.13 - 0.13
JUMLAH TOTAL BOBOT PEKERJAAN 100.00 29.64 5.05 34.69
JADWAL WAKTU PELAKSANAAN
NAMA KEGIATAN : Belanja Jasa Konstruksi Relokasi Puskesmas Laladon Kecamatan Ciomas
LOKASI : Kecamatan Ciomas - Bogor (Kab.)
TAHUN ANGGARAN : 2023
POKJA PEMILIHAN : POKJA PEMILIHAN 6
PENAWAR : CV. DUTA BANGUN PERTIWI

SEPTEMBER OKTOBER NOVEMBER DESEMBER


NO ITEM PEKERJAAN BOBOT KETERANGAN
19-25 26-,02 3-,09 10-,16 17-,23 24-,30 31-,06 07-,13 14-,20 21-,27 28-,04 05-,11 12-,18 19-,25 26-,27

I PEKERJAAN PERSIAPAN 1.58 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 0.105 100
II PEKERJAAN STRUKTUR 12.11 1.345 1.345 1.345 1.345 1.345 1.345 1.345 1.345 1.345
90
80
III PEKERJAAN STRUKTUR ATAS 19.65 1.965 1.965 1.965 1.965 1.965 1.965 1.965 1.965 1.965 1.965 70
IV PEKERJAAN ARSITEKTUR 40.26 2.200 2.200 2.200 2.200 2.200 2.200 5.412 5.412 5.412 5.412 5.412 60
50
V PEKERJAAN INFRASTRUKTUR 11.60 1.289 1.289 1.289 1.289 1.289 1.289 1.289 1.289 1.289 40
VI PEKERJAAN ELEKTRIKAL 8.95 1.000 1.000 1.000 1.983 1.983 1.983 30
20
VII PEKERJAAN PLUMBING 5.86 0.586 0.586 0.586 0.586 0.586 0.586 0.586 0.586 0.586 0.586 10
0

JUMLAH NILAI PEKERJAAN 100.00


KEMAJUAN PEKERJAAN HARIAN 0.11 0.11 1.45 3.42 5.62 6.20 7.49 7.49 7.49 8.49 11.70 10.36 11.34 9.37 9.37
KEMAJUAN PEKERJAAN KUMULATIF 0 0.11 0.21 1.66 5.08 10.69 16.89 24.38 31.87 39.36 47.85 59.56 69.91 81.25 90.63 100.00
REALISASI PELAKSANAAN PEKERJAAN 0.559 0.602 7.189 4.098 1.732 5.410 6.868 3.181 5.047
KUMULATIF REALISASI PELAKSANAAN PEKERJAAN 0.559 1.160 8.349 12.447 14.179 19.589 26.457 29.638 34.685

DEVIASI 0 0.454 0.950 6.689 7.371 3.488 2.697 2.074 -2.235 -4.678

Bogor, Oktober 2023


Disetujui oleh: Diperiksa oleh: Dibuat dan Diajukan oleh:
PEJABAT PEMBUAT KOMITMEN (PPK) KONSULTAN PENGAWAS PENYEDIA JASA
DINAS KESEHATAN KABUPATEN BOGOR CV. TIGA SAUDARA CV. DUTA BANGUN PERTIWI

ANNI BERSARI KRISTINA H, SKM..M.KM AGUS PRADILA HARTANTO, ST HENDRO SEKTIAWAN


NIP. 197102221995012004 Team Leader Direktur

Keterangan :
Curva S Rencana
Curva S Realisasi
MINGGU PEMERINTAH KABUPATEN BOGOR
DINAS KESEHATAN
Jalan Raya Tegar Beriman, Kecamatan Cibinong, Kabupaten Bogor
09

LAPORAN VISUAL

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Catatan :
Pasangan Bata
dan Plesteran
Pagar Type 1

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Catatan :
Pekerjaan
Plesteran dan
Acian dinding
Pagar Type 1

LEMBAR KE 33

JUMLAH LEMBAR
MINGGU PEMERINTAH KABUPATEN BOGOR
DINAS KESEHATAN
Jalan Raya Tegar Beriman, Kecamatan Cibinong, Kabupaten Bogor
09

LAPORAN VISUAL

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Catatan :
Pekerjaan pleteran
dinding bata

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Fabrikasi rangka
baja ringan

LEMBAR KE 34

JUMLAH LEMBAR
MINGGU PEMERINTAH KABUPATEN BOGOR
DINAS KESEHATAN
Jalan Raya Tegar Beriman, Kecamatan Cibinong, Kabupaten Bogor
09

LAPORAN VISUAL

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Catatan :
Pekerjaan dinding
bata lantai 2 dan
atap

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Fabrikasi rangka
baja ringan

LEMBAR KE 35

JUMLAH LEMBAR
MINGGU PEMERINTAH KABUPATEN BOGOR
DINAS KESEHATAN
Jalan Raya Tegar Beriman, Kecamatan Cibinong, Kabupaten Bogor
09

LAPORAN VISUAL

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Catatan :
Urugan dan
pemadatan
peninggian tanah

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Pasangan dinding
bata ringan lantai 2

LEMBAR KE 36

JUMLAH LEMBAR
MINGGU PEMERINTAH KABUPATEN BOGOR
DINAS KESEHATAN
Jalan Raya Tegar Beriman, Kecamatan Cibinong, Kabupaten Bogor
09

LAPORAN VISUAL

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Catatan :
Tampak depan dan
tampak belakang

Tanggal Foto :
(14 November
2023- 20
November 2023)

Progres :

Realisasi : 34.69 %
Rencana : 39.36%
Deviasi : -4.68%

Obyek :

Pasangan dinding
bata ringan lantai 2

LEMBAR KE 37

JUMLAH LEMBAR

Anda mungkin juga menyukai