Anda di halaman 1dari 14

LAPORAN MINGGUAN

PERIODE MINGGU KE- 3


( 04 s/d 10 Desember 2023 )

PEKERJAAN :
PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)

LOKASI PEKERJAAN :
JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PROVINSI PAPUA

PENYEDIA JASA KONSTRUKSI :

KONSULTAN PENGAWAS :

CV. MEGA DALLES ENGINEERING

TAHUN ANGGARAN :

2023
LAPORAN KEMAJUAN
PEKERJAAN : PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)
TYPE : RUMAH SUSUN T-36 KDS-D
JUMLAH LANTAI : 3 LANTAI
LOKASI PEKERJAAN : JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PENYEDIA JASA KONSTRUKSI : CV. DUNSADA ENGINEERING
TAHUN ANGGARAN : 2023
MINGGU KE - 3

( 04 s/d 10 Desember 2023 )


KONTRAK MC NOL Progres Mingguan

NO. URAIAN PEKERJAAN s/d Minggu Lalu MINGGU INI s/d MINGGU INI
BOBOT Persentase Terhadap Item
JUMLAH HARGA Bobot Bobot Bobot
(%) Pekerjaan ( % )
(%) (%) (%)

I. PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI


I.A PEKERJAAN PERSIAPAN STANDAR 500.000,00 0,07 0,07 - 0,07 100%

I.B. PEKERJAAN RK3K KONSTRUKSI 2.500.000,00 0,36 0,36 - 0,36 100%

II PEKERJAAN ARSITEKTUR STANDAR


1, PEKERJAAN LANTAI SATU

II.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING 13.063.376,00 1,86 - - - 0%

II.3 PEKERJAAN PLAFOND 20.042.799,00 2,85 - 0,52 0,52 18%

II.6 PEKERJAAN PENGECATAN 246.384.686,60 35,00 5,79 6,50 12,28 35%

III PEKERJAAN LANTAI DUA

II.3 PEKERJAAN PLAFOND 6.236.123,17 0,89 - - - 0%

II.6 PEKERJAAN PENGECATAN 146.149.917,80 20,76 - - - 0%

I.3 PEKERJAAN PLAFOND 21.666.100,00 3,08 - - - 0%

I.6 PEKERJAAN PENGECATAN 100.082.248,58 14,22 - - - 0%

II PEKERJAAN LANTAI DAK DAN ATAP

II.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 1.569.514,32 0,22 - - - -

II.3 PEKERJAAN PLAFOND 17.335.571,60 2,46 - - - 0%

II.4 PEKERJAAN LANTAI 37.055.388,72 5,26 - - - 0%

II.7 PEKERJAAN PENUTUP ATAP 53.659.706,97 7,62 - - - 0%

1.B PEKERJAAN ARSITEKTUR NON STANDART

1.B.2 PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.

II DRAINASE LUAR/SEKELILING BANGUNAN 34.915.104,41 4,96 - - - 0%

2, INSTALASI KABEL FEEDER 2.838.504,04 0,40 - - - 0%

Page 1
TOTAL 703.999.041,20 100,00 6,21 7,02 12,80 13%
PPN 11% 77.439.894,53
TOTAL ( TERMASUK PPN) 781.438.935,73
Pembulatan 781.438.000,00

Disetujui Oleh : Diperiksa Oleh : Merauke, 10 December 2023


Pejabat Pembuat Komitmen KONSULTAN PENGAWAS Dibuat Oleh :
Rumah Susun dan Rumah Khusus CV. MEGA DALLES ENGINEERING PENYEDIA JASA KONSTRUKSI
Paket Perawatan Rumah Susun Polres Marauke CV. DUNSADA ENGINEERING

ADOLF LEONARD BATLOLONA, S.T MALIK ASO


NIP. 19740111 200502 1 004 Direktur DEREK WAINYAMBE, SH
Direktur

Page 2
LAPORAN KEMAJUAN
PEKERJAAN : PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)
TYPE : RUMAH SUSUN T-36 KDS-D
JUMLAH LANTAI : 3 LANTAI
LOKASI PEKERJAAN : JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PENYEDIA JASA KONSTRUKSI : CV. DUNSADA ENGINEERING
TAHUN ANGGARAN : 2023
MINGGU KE - 3

( 04 s/d 10 Desember 2023 )


KONTRAK Progres Mingguan

NO. URAIAN PEKERJAAN SAT. s/d Minggu Lalu MINGGU INI s/d MINGGU INI
KONTRAK MC NOL HARGA BOBOT Persentase Terhadap
JUMLAH HARGA Bobot Bobot Bobot
SATUAN (%) Volume Volume Volume Item Pekerjaan ( % )
VOLUME WAKTU VOLUME WAKTU (%) (%) (%)

I. PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI


I.A PEKERJAAN PERSIAPAN STANDAR 500.000,00 0,07 0,07 - 0,07 100%
1, Papan Nama Proyek ls 1,00 1,00 1,00 1,00 500.000,00 500.000,00 0,07 1,00 0,07 - - 1,00 0,07 100,00%
2, Foto Proyek Phase 3,00 1,00 1,00 350.000,00 - -
3, Air Kerja Ls 1,00 1,00 1,00 6.247.790,00 - -
4, Listrik Kerja Ls 1,00 1,00 1,00 6.000.000,00 - -

I.B. PEKERJAAN RK3K KONSTRUKSI 2.500.000,00 0,36 0,36 - 0,36 100%


1, Penyiapan RK3K terdiri atas: LS 1,00 1,00 1,00 1.500.000,00 - -
a Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja
b Pembuatan Kartu Identitas Pekerja (KIP);

2, Sosialisasi dan Promosi K3 terdiri atas:


a Induksi K3 (Safety Induction ); khusus untukpekerja baru Org 55,00 1,00 1,00 200.000,00 - -
b Pengarahan K3 (safety briefing) : Pertemuan Keselamatan (Safety Talk dan/atau Tool Box Meeting) ; setiap hari Org 55,00 1,00 1,00 200.000,00 - -
Pelatihan K3;
- Bekerja di Ketinggian
- K3 Peralatan Konstruksi & Penggunaan bahan Kimia (MSDS)
- Analysis Keselamatan Pekerjaan
- Perilaku Berbasis Keselamatan (Budaya K3)
- P3K
d Simulasi K3; Org 14,00 1,00 1,00 300.000,00 - -
e Spanduk (banner) ; Lb 5,00 1,00 5,00 1,00 500.000,00 2.500.000,00 0,36 5,00 0,36 - - 5,00 0,36 100,00%
f Poster; Lb 3,00 1,00 1,00 500.000,00 - -
g Papan Informasi K3. Bh 1,00 1,00 1,00 600.000,00 - -

3, Alat Pelindung Kerja terdiri atas:


a Jaring Pengaman(Polynet/Safety Net);
b Tali Keselamatan (Life Line); Ls 2,00 1,00 1,00 750.000,00 - -
c Penahan Jatuh (Safety Deck); Ls 1,00 1,00 1,00 1.375.000,00 - -
d Pagar Pengaman (Guard Railling); Ls 1,00 1,00 1,00 5.460.000,00 - -
e Pembatas Area (Restricted Area ). Ls 1,00 1,00 1,00 569.000,00 - -

4, Alat Pelindung Diri terdiri atas:


a Topi Pelindung (Safety Helmet) ; Bh 55,00 1,00 1,00 175.000,00 - -
b Pelindung Mata (Goggles, Spectacles); Psg 17,00 1,00 1,00 70.000,00 - -
c Tameng Muka (Face Shield); Bh 14,00 1,00 1,00 45.000,00 - -
d Masker Selam (Breathing Apparatus); Bh 1,00 1,00 160.000,00 -
e Pelindung Telinga (Ear Plug, Ear Muff); Psg 17,00 1,00 1,00 87.000,00 - -
f Pelindung Pernafasan Dan Mulut (Masker); Bh 55,00 1,00 1,00 50.000,00 - -
g Sarung Tangan (Safety Gloves); Psg 17,00 1,00 1,00 28.000,00 - -
h Sepatu Keselamatan (Safety Shoes); untuk Staf Psg 17,00 1,00 1,00 250.000,00 - -
h Sepatu Keselamatan (Rubber Safety Shoes and toe cap) Psg 55,00 1,00 1,00 173.000,00 - -
i Penunjang Seluruh Tubuh (Full Body Harness); Bh 5,00 1,00 1,00 222.000,00 - -
j Jaket Pelampung (Life Vest);
k Rompi Keselamatan (Safety Vest); Bh 55,00 1,00 1,00 57.000,00 - -
l Celemek (Apron/Coveralls); Bh
m Pelindung Jatuh (Fall Arrester); Bh 5,00 1,00 1,00 459.000,00 - -

7, P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) Ls 1,00 1,00 1,00 1.000.000,00 - -
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll); Ls 1,00 1,00 1,00 1.000.000,00 - -

8, Rambu-rambu : LS 1,00 1,00 2.650.000,00 -


a Rambu Petunjuk;
b Rambu Larangan; -
c Rambu Peringatan;

Page 3
d Rambu Kewajiban;
e Rambu Informasi;
f Rambu Pekerjaan Sementara;
g Tongkat Pengatur Lalu Lintas (Warning Lights Stick) ;
h Kerucut Lalu Lintas (Traffic Cone) ;
i Lampu Putar (Rotary Lamp );
j Lampu Selang Lalu Lintas.

9, Lain- Lain Terkait Pengendalian Risiko K3


Alat Pemadam Api Ringan (APAR); 10Kg Bh 2,00 1,00 1,00 781.000,00 - -
Sirine; Bh 4,00 1,00 1,00 1.000.000,00 - -
Bendera K3; Bh 2,00 1,00 1,00 300.000,00 - -
Jalur Evakuasi (Escape Route ); Ls 1,00 1,00 1,00 500.000,00 - -
Lampu Darurat (Emergency Lamp ); Bh 2,00 1,00 1,00 500.000,00 - -
Program Inspeksi Dan Audit Internal; Org 2,00 1,00 1,00 1.000.000,00 - -

II PEKERJAAN ARSITEKTUR STANDAR


1, PEKERJAAN LANTAI SATU

II.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING 13.063.376,00 1,86 - - - 0%
Jendela J3 M' 461.400,00 -
27, Perbaikan Selimar aluminium
Pintu Jendela PJ1 M' 21,04 274.400,00 5.773.376,00 0,82 - - - - - - 0,00%
31, Perbaikan Handle pintu + pengunci
Pintu P1 bh 15,00 162.000,00 2.430.000,00 0,35 - - - - - - 0,00%
Pintu P2 bh 15,00 162.000,00 2.430.000,00 0,35 - - - - - - 0,00%
Pintu P4 bh 15,00 162.000,00 2.430.000,00 0,35 - - - - - - 0,00%
II.3 PEKERJAAN PLAFOND 20.042.799,00 2,85 - 0,52 0,52 18%
1, Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm M2 49,90 267.600,00 13.352.571,00 1,90 - - 12,47 0,47 12,47 0,47 25,00%
2, Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 4,12 316.900,00 1.305.628,00 0,19 - - 1,03 0,05 1,03 0,05 25,00%
3, Pek. List Plafond Gypsum 5/5 M' 109,00 49.400,00 5.384.600,00 0,76 - - - - - - 0,00%

II.6 PEKERJAAN PENGECATAN 246.384.686,60 35,00 5,79 6,50 12,28 35%


1, Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) M2 314,22 98.000,00 30.793.560,00 4,37 62,84 0,87 62,84 0,87 125,69 1,75 40,00%
2, Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) M2 1.878,93 92.000,00 172.861.718,00 24,55 375,79 4,91 375,79 4,91 751,57 9,82 40,00%
3, Pek. Cat Canopy M2 153,59 98.000,00 15.051.526,00 2,14 - - 38,40 0,53 38,40 0,53 25,00%
4, Pek. Cat Plafond M2 54,02 92.000,00 4.969.610,00 0,71 - - 13,50 0,18 13,50 0,18 25,00%
5, Pek. Cat List Plafond M1 109,00 9.200,00 1.002.800,00 0,14 - - - - - - 0,00%
6, Pek. Cat Tralis Besi Hollow setiap Unit M2 36,00 200.100,00 7.203.600,00 1,02 - - - - - - 0,00%
7, Pek. Cat Daun Pintu P1 M2 25,83 200.100,00 5.168.583,00 0,73 - - - - - 0,00%
8, Pek. Pengecatan Kusen & Daun Alumunium M2 101,45 92.000,00 9.333.289,60 1,33 - - - - - 0,00%

III PEKERJAAN LANTAI DUA

II.3 PEKERJAAN PLAFOND 6.236.123,17 0,89 - - - 0%


1, Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm M2 7,27 267.600,00 1.945.237,92 0,28 - - - - - - 0,00%
2, Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 8,01 316.900,00 2.539.161,25 0,36 - - - - - - 0,00%
3, Pek. List Plafond Gypsum 5/5 M' 35,46 49.400,00 1.751.724,00 0,25 - - - - - - 0,00%

II.6 PEKERJAAN PENGECATAN 146.149.917,80 20,76 - - - 0%


1, Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) M2 282,65 98.000,00 27.699.798,00 3,93 - - - - - - 0,00%
2, Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) M2 898,08 92.000,00 82.623.338,80 11,74 - - - - - - 0,00%
3, Pek. Cat Canopy M2 126,42 98.000,00 12.389.160,00 1,76 - - - - - - 0,00%
4, Pek. Cat Plafond M2 15,28 92.000,00 1.405.916,40 0,20 - - - - - - 0,00%
5, Pek. Cat List Plafond M1 35,46 9.200,00 326.232,00 0,05 - - - - - - 0,00%
6, Pek. Cat Tralis Besi Hollow setiap Unit M2 36,00 200.100,00 7.203.600,00 1,02 - - - - - - 0,00%
7, Pek. Cat Daun Pintu P1 M2 25,83 200.100,00 5.168.583,00 0,73 - - - - - - 0,00%
8, Pek. Pengecatan Kusen & Daun Alumunium M2 101,45 92.000,00 9.333.289,60 1,33 - - - - - - 0,00%

I PEKERJAAN LANTAI TIGA

I.3 PEKERJAAN PLAFOND 21.666.100,00 3,08 - - - 0%

1 Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm M2 71,75 267.600,00 19.200.300,00 2,73 - - - - - - 0,00%
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 1,00 316.900,00 316.900,00 0,05 - - - - - - 0,00%
3 Pek. List Plafond Gypsum 5/5 M' 43,50 49.400,00 2.148.900,00 0,31 - - - - - - 0,00%

I.4 PEKERJAAN LANTAI -


1 Pek. Pasang Homogenous Tile Step Nozing Tangga Tengah + Tangga Servis Uk. 10 x 60 cm M' 185.700,00 -
2 Pek. Pasang Keramik polish lantai Unit Hunian, R. Serbaguna, Koridor, Tangga Utama dan Tangga Servis Uk. 40x40 cm m2 444.100,00 -
3 Pek. Waterproofing (liquid/cement base) Lantai + Dinding t=210 cm Toilet, R Cuci M2 140.400,00 -
4 Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela M2 140.400,00 -

I.5 PEKERJAAN UTILITAS - -

1 Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpasang) Buah 2.052.100,00 - -
2 Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap terpasang) Buah 1.227.700,00 - -
3 Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang) Buah 1.693.109,00 - -
4 Pasang Kran Stainless - Unit Hunian, dan Janitor (lengkap terpasang) Buah 500.400,00 - -
5 Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang) Buah 307.400,00 - -
6 Pasangan Floor Drain Stainless, di Toilet Hunian, di Ruang Cuci, di Janitor, dan di Tempat Sampah Buah 3.269.600,00 - -
7 Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang) Buah 1.189.000,00 - -

I.6 PEKERJAAN PENGECATAN 100.082.248,58 14,22 - - - 0%

1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) M2 282,65 98.000,00 27.699.798,00 3,93 - - - - - - 0,00%
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) M2 339,07 92.000,00 31.194.617,98 4,43 - - - - - - 0,00%
3 Pek. Cat Canopy M2 126,42 98.000,00 12.389.160,00 1,76 - - - - - - 0,00%
4 Pek. Cat Plafond M2 72,75 92.000,00 6.693.000,00 0,95 - - - - - - 0,00%
5 Pek. Cat List Plafond M1 43,50 9.200,00 400.200,00 0,06 - - - - - - 0,00%
6, Pek. Cat Tralis Besi Hollow setiap Unit M2 36,00 200.100,00 7.203.600,00 1,02 - - - - - - 0,00%

Page 4
7, Pek. Cat Daun Pintu P1 M2 25,83 200.100,00 5.168.583,00 0,73 - - - - - - 0,00%
8, Pek. Pengecatan Kusen & Daun Alumunium M2 101,45 92.000,00 9.333.289,60 1,33 - - - - - - 0,00%

II PEKERJAAN LANTAI DAK DAN ATAP

II.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 1.569.514,32 0,22 - - - -

2 Pek. Plester + Aci Mortar Dinding Bata Exterior/Dind. Terluar M2 24,22 64.800,00 1.569.514,32 0,22 - - - - - - 0,00%

II.3 PEKERJAAN PLAFOND 17.335.571,60 2,46 - - - 0%

1 Pek. Beton Expose M2 34,32 49.400,00 1.695.605,90 0,24 - - - - - - 0,00%


2 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 49,35 316.900,00 15.639.965,70 2,22 - - - - - - 0,00%
II.4 PEKERJAAN LANTAI 37.055.388,72 5,26 - - - 0%

1 Waterproofing Membran Bakar t=3cm Lantai Dak Torn (elv. +13,8) + 15 cm Pada Tanggulan m2 74,40 275.256,30 20.479.068,72 2,91 - - - - - - 0,00%
2 Pek. Screed + Aci Lantai Dak Torn (elv. +13,8) m2 74,40 222.800,00 16.576.320,00 2,35 - - - - - - 0,00%

II.7 PEKERJAAN PENUTUP 53.659.706,97 7,62 - - - 0%

1 Pek. Atap Metal Spandeck Berpasir T=0.45 MM M2 53,01 452.600,00 23.993.538,97 3,41 - - - - - - 0,00%
2 Pek. Nok Genteng M' 29,64 336.000,00 9.958.368,00 1,41 - - - - - - 0,00%
3 Pek. Lisplang GRC Tebal 9 mm Lebar 40 cm + Cat Exterior M' 62,00 151.900,00 9.417.800,00 1,34 - - - - - - 0,00%
4 Talang zincalum t= 0,35mm, L=90 cm M' 28,00 367.500,00 10.290.000,00 1,46 - - - - - - 0,00%

1.B PEKERJAAN ARSITEKTUR NON STANDART

1.B.2 PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.

II DRAINASE LUAR/SEKELILING BANGUNAN 34.915.104,41 4,96 - - - 0%


1, Pek. Pasangan 1/2 Bata Saluran M2 52,83 371.600,00 19.631.330,72 2,79 - - - - - - 0,00%
2, Pek. Plesteran 1:3 M2 78,37 128.100,00 10.038.940,80 1,43 - - - - - - 0,00%
3, Pek. Acian M2 78,40 66.900,00 5.244.832,89 0,75 - - - - - - 0,00%

II. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


II. A PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDART
A.1 LANTAI 1
1, PEMIPAAN AIR BERSIH - -
Pipa PVC AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 314,00 42.307,65 -
- PVC AW dia. 20 m 57,00 - 44.475,75 - -
- PVC AW dia. 25 m 4,00 48.780,90 - -
- PVC AW dia. 40 m 110,00 74.333,70 -
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 16,00 80.661,49 -
Peralatan Katup-katup -
(Ball Valve & Gate Valve) -
- dia. 25 bh 2,00 314.755,04 - -
- dia. 40 bh 1,00 372.667,26 - -
- Meter Air c/w BV dia. 20 bh 12,00 378.183,76 -

2, PEMIPAAN AIR KOTOR & AIR BEKAS - -


Pipa PVC AW (Incl. Fitting & Accessories)
- dia. 150 ( horisontal pipa air kotor ) m 108,00 405.530,10 -
- dia. 150 ( horisontal pipa air bekas) m 105,00 405.530,10 -
- dia. 150 ( riser pipa air kotor ) m 53,00 405.530,10 -
- dia. 100 ( riser pipa air bekas ) m 51,00 166.308,75 -
- dia. 100 m 51,00 166.308,75 -
- dia. 80 m 48,00 104.526,11 -
- dia. 50 m 49,00 80.661,49 -
- dia. 20 ( pipa drain ac + isolasi ) m 36,00 66.713,63 - -
Clean Out (CO) -
- CO, dia. 150 bh 6,00 237.309,80 - -
- CO, dia. 100 bh 4,00 197.891,90 - -
- Portable Grease Trap bh 12,00 597.055,81 -

3, PEMIPAAN AIR HUJAN - -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( pipa horisontal ) M 104,00 405.530,10 -
- dia. 100 ( pipa tegak ) M 16,00 166.308,75 - -
- dia. 80 ( riser pipa cucian ) M 36,00 104.526,11 - -
- dia. 50 M 16,00 80.661,49 - -

4, PEMIPAAN VENT - -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser ) M 48,00 104.787,68 - -
- Dia. 32 M 144,00 70.934,74

5, INSTALASI PANEL - -
Pengadaan dan pemasangan PP-LT.1 unit 1,00 7.637.995,45 - -
dengan komponen panel, sbb :
- MCCB 3P, 75 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 12,00 380.610,92
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 12,00 770.855,65
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6, INSTALASI KABEL FEEDER - -


a. Kabel Distribusi Daya dari MDP :

Page 5
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.1 m1 10,00 181.747,51 - -
-
b. Kabel Distribusi Daya dari PP-LT.1 ke : -
- NYM 3 x 4 mm2 ke P-Unit/1 m1 34,15 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/2 m1 28,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/3 m1 18,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/4 m1 29,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/5 m1 35,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/6 m1 43,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/7 m1 34,35 66.803,71 -
- NYM 3 x 4 mm2 ke P-Unit/8 m1 29,11 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/9 m1 19,25 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/10 m1 22,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/11 m1 25,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/12 m1 28,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Serbaguna m1 16,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Pengelola m1 22,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Mushola m1 25,95 66.803,71 - -

7, INSTALASI KABEL TRAY -


- Kabel Tray W600 x H100 m' 16,00 628.192,14
- Kabel Tray W200 x H100 m' 56,00 280.540,50

Fitting-Fitting :
- Elbow W200 x H100 bh 1,00 184.703,85
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 -

8, INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK - -


- Lampu LED 9 Watt bh 16,00 166.317,46 - -
- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 4,00 197.911,96 - -
- Lampu LED 7 Watt bh 16,00 99.969,01 - -
- Lampu Baret isi TL Bulat-20 watt c/w battery charger bh 1,00 758.844,73 - -
- Exit Lamp-18 watt c/w battery charger bh 2,00 1.035.925,98 - -
- Lampu TL 1 x 36 watt, Balk bh 2,00 673.905,67 - -
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 29,00 52.533,53 - -
- Stop Kontak AC 1P, 220 Volt, 16A, Wall Type bh 24,00 83.074,88 - -
- Saklar 1 gang bh 45,00 42.002,03 - -
- Saklar 2 gang bh 30,00 63.065,03 - -
- Saklar Hotel 1 gang bh 1,00 40.948,88 - -
- Saklar Hotel 2 gang bh 2,00 72.543,38 - -

9, INSTALASI PENERANGAN & STOP KONTAK - -


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 41,00 316.579,90 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 29,00 409.412,44 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak AC ttk 24,00 533.189,16 - -

A.2 LANTAI 2
1, PEMIPAAN AIR BERSIH - -
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 352,00 42.307,65 -
- PVC AW dia. 20 m 64,00 44.475,75 - -
- PVC AW dia. 40 m 110,00 74.333,70 -
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 16,00 80.661,49 - -
Peralatan Katup-katup -
(Ball Valve & Gate Valve) -
- dia. 40 bh 1,00 372.667,26 - -
- Meter Air c/w BV dia. 20 bh 16,00 378.183,76 - -

2, PEMIPAAN AIR KOTOR & AIR BEKAS - -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( riser pipa air kotor ) m 64,00 405.530,10 -
- dia. 100 ( riser pipa air bekas ) m 64,00 166.308,75 -
- dia. 100 m 24,00 166.308,75 - -
- dia. 80 m 48,00 104.526,11 - -
- dia. 50 m 48,00 80.661,49 - -
- dia. 20 ( pipa drain ac + isolasi ) m 192,00 66.713,63 -
- Dop, dia. 80 bh 32,00 253.056,90 -
- Portable Grease Trap bh 16,00 597.055,81 -

3, PEMIPAAN AIR HUJAN - -


Pipa PVC Kelas AW (Incl. Fitting & Accessories) -
- dia. 100 ( pipa tegak ) m 16,00 166.308,75 - -
- dia. 80 ( riser pipa cucian ) m 18,00 104.526,11 - -

4, PEMIPAAN VENT - -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser ) m 16,00 104.787,68 - -
- Dia. 32 m 192,00 70.934,74 -

5, INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.2 unit 1,00 7.637.995,45
dengan komponen panel, sbb :
- MCCB 3P, 63 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 16,00 380.610,92
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16,00 770.855,65
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6, INSTALASI KABEL FEEDER - -


a Kabel Distribusi Daya dari MDP : m' 16,00 181.747,51 - -

Page 6
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.2 -
-
b Kabel Distribusi Daya dari PP-LT.2 ke : -
- NYM 3 x 4 mm2 ke P-Unit/1 m' 34,15 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/2 m' 28,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/3 m' 16,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/4 m' 18,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/5 m' 29,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/6 m' 35,95 66.803,71 -
- NYM 3 x 4 mm2 ke P-Unit/7 m' 43,95 66.803,71 -
- NYM 3 x 4 mm2 ke P-Unit/8 m' 34,35 66.803,71 -
- NYM 3 x 4 mm2 ke P-Unit/9 m' 29,11 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/10 m' 19,25 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/11 m' 16,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/12 m' 28,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/13 m' 22,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/14 m' 25,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/15 m' 28,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/16 m' 32,00 66.803,71 - -

7, INSTALASI KABEL TRAY - -


- Kabel Tray W200 x H100 m' 56,00 280.540,50 - -
Fitting-Fitting : -
- Elbow W200 x H100 bh 1,00 184.703,85 - -
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 3.694,08 - -

8, INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK - -


- Lampu LED 9 Watt bh 20,00 166.317,46 - -
- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 3,00 197.911,96 - -
- Lampu LED 7 Watt bh 12,00 99.969,01 - -
- Lampu Baret isi TL Bulat-32 watt c/w battery charger bh 3,00 758.844,73 - -
- Exit Lamp-18 watt c/w battery charger bh 3,00 1.035.925,98 - -
- Lampu TL 1 x 36 watt, Balk bh 3,00 673.905,67 - -
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 24,00 52.533,53 - -
- Stop Kontak AC 1P, 220 Volt, 16A, Wall Type bh 12,00 83.074,88 - -
- Saklar 1 gang bh 64,00 42.002,03 - -
- Saklar 2 gang bh 16,00 63.065,03 - -
- Saklar Hotel 1 gang bh 3,00 40.948,88 - -
- Saklar Hotel 2 gang bh 2,00 72.543,38 - -

9, INSTALASI PENERANGAN & STOP KONTAK - -


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 41,00 316.579,90 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 24,00 409.412,44 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak AC ttk 12,00 533.189,16 -

A.3. LANTAI 3
1, PEMIPAAN AIR BERSIH - -
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 88,00 42.307,65 - -
- PVC AW dia. 20 m 64,00 44.475,75 - -
- PVC AW dia. 40 m 110,00 74.333,70 -
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 16,00 80.661,49 - -
Peralatan Katup-katup -
(Ball Valve & Gate Valve) -
- dia. 40 bh 1,00 372.667,26 - -
- Meter Air c/w BV dia. 20 bh 16,00 378.183,76 - -

2, PEMIPAAN AIR KOTOR & AIR BEKAS - -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 150 ( riser pipa air kotor ) m 64,00 405.530,10 -
- dia. 100 ( riser pipa air bekas ) m 64,00 166.308,75 -
- dia. 100 m 9,00 166.308,75 - -
- dia. 80 m 12,00 104.526,11 - -
- dia. 50 m 48,00 80.661,49 - -
- dia. 20 ( pipa drain ac + isolasi ) m 48,00 66.713,63 -
- Dop, dia. 80 bh 32,00 253.056,90 -
- Portable Grease Trap bh 16,00 597.055,81 -

3, PEMIPAAN AIR HUJAN - -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 ( pipa tegak ) m 16,00 166.308,75 - -
- dia. 80 ( riser pipa cucian ) m 16,00 104.526,11 - -

4, PEMIPAAN VENT -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser ) m 104.787,68
- Dia. 32 m 70.934,74

5, INSTALASI PANEL -
Pengadaan dan pemasangan PP-LT.3 unit 7.637.995,45
dengan komponen panel, sbb :
- MCCB 3P, 63 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 380.610,92
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 770.855,65
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh

6, INSTALASI KABEL FEEDER - -


a Kabel Distribusi Daya dari MDP :
- NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.3 m 22,00 181.747,51 - -

Page 7
b Kabel Distribusi Daya dari PP-LT.3 ke :
- NYM 3 x 4 mm2 ke P-Unit/1 m' 34,15 66.803,71
- NYM 3 x 4 mm2 ke P-Unit/2 m' 28,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/3 m' 16,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/4 m' 18,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/5 m' 29,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/6 m' 35,95 66.803,71
- NYM 3 x 4 mm2 ke P-Unit/7 m' 43,95 66.803,71
- NYM 3 x 4 mm2 ke P-Unit/8 m' 34,35 66.803,71
- NYM 3 x 4 mm2 ke P-Unit/9 m' 29,11 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/10 m' 19,25 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/11 m' 16,45 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/12 m' 28,95 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/13 m' 22,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/14 m' 25,00 66.803,71 - -
- NYM 3 x 4 mm2 ke P-Unit/15 m' 28,00 66.803,71 -
- NYM 3 x 4 mm2 ke P-Unit/16 m' 32,00 66.803,71

7, INSTALASI KABEL TRAY -


- Kabel Tray W200 x H100 m' 56,00 280.540,50 - -
Fitting-Fitting :
- Elbow W200 x H100 bh 1,00 184.703,85 - -
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 3.694,08 - -

8, INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK - -


- Lampu LED 9 Watt bh 12,00 166.317,46 - -
- Lampu LED 9 Watt, c/w battery charger (Selasar) bh 3,00 197.911,96 - -
- Lampu LED 7 Watt bh 12,00 99.969,01 - -
- Lampu Baret isi TL Bulat-32 watt c/w battery charger bh 2,00 758.844,73 - -
- Exit Lamp-18 watt c/w battery charger bh 2,00 1.035.925,98 - -
- Lampu TL 1 x 36 watt, Balk bh 2,00 673.905,67 - -
- Stop Kontak 1P, 220 Volt, 10A, Wall Type bh 24,00 52.533,53 - -
- Stop Kontak AC 1P, 220 Volt, 16A, Wall Type bh 12,00 83.074,88 - -
- Saklar 1 gang bh 24,00 42.002,03 - -
- Saklar 2 gang bh 16,00 63.065,03 - -
- Saklar Hotel 1 gang bh 3,00 40.948,88 - -
- Saklar Hotel 2 gang bh 2,00 72.543,38 - -

9, INSTALASI PENERANGAN & STOP KONTAK - -


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 33,00 316.579,90 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 24,00 409.412,44 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak AC ttk 12,00 533.189,16 - -

A.4. LANTAI ATAP


1, PEMIPAAN AIR BERSIH - -
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 50 m 8,00 80.661,49 - -
- PVC AW dia. 32 (Pipa Drain) m 6,00 72.646,20 - -
- PVC AW dia. 100 (Header) m 4,00 207.885,94 - -
Peralatan Katup-katup -
(Ball Valve & Gate Valve) -
- dia. 50 bh 4,00 504.441,40 - -
- dia. 32 bh 2,00 320.812,16 - -

2, PEMIPAAN AIR HUJAN - -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- dia. 100 m 32,00 166.308,75 - -
-
Roof Drain, Cast Iron -
- dia. 100 bh 4,00 429.584,90 - -
- dia. 80 bh 12,00 319.254,90 - -

3, INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK - -


- Lampu LED 9 Watt bh 2,00 166.317,46 - -
- Lampu Baret isi TL Bulat-32 watt c/w battery charger bh 2,00 758.844,73 - -
- Saklar 1 gang bh 2,00 42.002,03 - -
- Saklar Hotel 1 gang bh 2,00 40.948,88 - -

4, INSTALASI PENERANGAN & STOP KONTAK - -


- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu TTK 4,00 316.579,90 - -

A.5. PEKERJAAN UTILITAS


1, INSTALASI PANEL - -
a P-PLN
- MCCB 3P, 200 A : 1 bh BY PLN BY PLN
- Accessories & Termination : 1 lot
- Box Panel : 1 unit

b P-MDP
Pengadaan dan pemasangan MDP, dengan komponen panel, sbb : unit 1,00 4.035.720,95 - -
- Mgs 3P, 63 A
- MCCB 3P, 200 A
- MCCB 3P, 80 A
- MCCB 3P, 32 A
- MCB 3P, 32 A
- Contacto, (timer switch)
- Earth Fault Relay
- Over Current Relay
- Over / Under Voltage Relay
- Power Factor-meter
- Frequency-metr
- Ampere-meter 300/5 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- CT 300/5 A
- CT 50/5 A
- Fuse Carrier 4 A
- Indicator Lamp
- Rel MCCB 3P

Page 8
- CU Bar 5 x 400 A
- Accessories & Termination
- Box Panel

c P-PENGELOLA
Pengadaan dan pemasangan P-PENGELOLA dengan komponen panel, sbb : unit 1,00 3.478.052,95 - -
- MCCB 3P, 80 A
- MCB 3P, 63 A
- MCB 3P, 32 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 80 A
- Accessories & Termination
- Box Panel
- KW-meter/3ph/80A bh 1,00 1.244.773,15 - -

d P-POMPA AIR BERSIH


Pengadaan dan pemasangan P-POMPA AIR BERSIH, dengan komponen panel, sbb : unit 1,00 1.440.207,70 - -
- MCB 3P, 32 A
- MCB 3P, 10 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Radar diantaki air atas
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel

e P-POMPA HYDRANT
Pengadaan dan pemasangan P-POMPA HYDRANT, dengan komponen panel, sbb : unit 1,00 15.062.702,95 -
- MCB 3P, 40 A
- MCB 3P, 16 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel

2, INSTALASI KABEL FEEDER 2.838.504,04 0,40 - - - -


- NYY 4 x 70 mm2 + E-NYA 35 mm2 Dari P-PLN ke MDP m' 20,00 973.400,37 - -

Kabel Distribusi Daya dari MDP :


- NYY 4 x 16 mm2 + E-NYA 10 mm2 ke P-PENGELOLA-LT.1 m' 10,00 10,00 283.850,40 2.838.504,04 0,40 - - - - - - 0,00%

Kabel Distribusi Daya dari P-PENGELOLA :


- NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih m' 40,00 148.783,92 - -
- NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow Well Pump m' 40,00 114.717,02 - -

3, INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK - -


a Ruang Pompa
- TL 1 x 18 W, TL Balk Type bh 2,00 410.618,17 - -
- Stop Kontak 1P, 220 Volt, 13A, Wall Type bh 1,00 83.074,88 - -
- Saklar 1 gang bh 2,00 42.002,03 - -
-
b Lampu Taman -
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt bh 1.263.102,98 -

4, INSTALASI PENERANGAN & STOP KONTAK - -


a Ruang Pompa
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu ttk 2,00 316.579,90 - -
- NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak ttk 1,00 409.412,44 - -
-
b Lampu Taman -
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 10.760.110,18 -
-
- Testing & Commissioning lot 1,00 1.067.770,13 - -

A.6. PEKERJAAN SISTEM PENTANAHAN

1, INSTALASI - -
Pentanahan (Grounding) Netral Sistem & Pentanahan Body

a Body Panel
Item SBB:
Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box bh 1,00 811.440,24 - -
Termination R.Supporting Material lot 1,00 1.451.070,89 - -
Kabel BC 50 mm2 m 30,00 97.179,57 - -
Testing & Commissioning lot 1,00 517.789,81 - -
-
b Body Peralatan pada Sistem Elektronik Item SBB: -
Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box bh 1,00 811.440,24 - -
Termination R.Supporting Material lot 1,00 1.451.070,89 - -
Kabel BC 50 mm2 m 30,00 97.179,57 - -
Testing & Commissioning lot 1,00 517.789,81 - -

A.7. PEKERJAAN PENANGKAL PETIR -

INSTALASI
- Splitzen T=1 meter, pipa galvanized c/w : peralatan bantu unit 11,00 501.951,35 -
- Bak kontrol 40x40x30 cm unit 2,00 634.511,04 -
- Down Conduktor BC 50mm + accessories m' 83,00 97.179,57 -

Page 9
- Grounding System max. 2 ohm lot 2,00 811.440,24 -
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box -
- Biaya Instalasi lot 1,00 411.981,79 -
- Material Bantu lot 1,00 329.585,43 -
- Testing & Comissioning included perijinan dari DEPNAKER lot 1,00 1.067.770,13 -
- Bracket, Seal , Test Box , dls lot 1,00 247.189,07 -

B. PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART


B.1. PEKERJAAN PEMADAM KEBAKARAN
1, INSTALASI APAR -

LANTAI 1
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00 386.455,90 -
- Type Class BC 4,6 kg CO2 Seamless, c/w support bh 1,00 897.233,65 -

LANTAI 2
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00 386.455,90 -

LANTAI 3
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00 386.455,90 -

B.2 PEKERJAAN VENTILASI UDARA


I EXHAUST FAN - -
LANTAI 1
- Exhaust kap 100 Cfm ( ceiling Mounted ) unit 12,00 917.143,20 -
Pipa PVC Class D
- dia. 100 m 48,00 155.526,98 -
- Grille 200 x 200 (Alumunium) bh 12,00 308.221,90 -
LANTAI 2 & 3 -
- Exhaust kap 200 CMH ( ceiling Mounted ) unit 32,00 917.143,20 -
Pipa PVC Class D -
- dia. 100 m 128,00 155.526,98 -
- Grille 200 x 200 (Alumunium) bh 32,00 308.221,90 -
B.3. PEKERJAAN INSTALASI ELEKTRONIK
I. PEKERJAAN SYSTEM TV - -
a PERALATAN UTAMA SYSTEM TV
Pengadaan dan pemasangan peralatan utama Sistem TV ditempatkan di Lantai Atap, dipasang secara lengkap
termasuk pondasi dan tiang penyangga sesuai diuraikan dalam Gambar dan Spesifikasi Teknis.
- Antena UHF unit 1,00 633.232,92 -
- Antena VHF unit 1,00 643.764,42 -
- MA (Master Amplifier) / Mixer bh 1,00 1.903.113,20 -
- Coaxial 7C/2V, dari Antena ke Mixer mtr 50,00 38.842,58 -
- Termination & supporting material lot 1,00 512.223,95 -

b SPLITTER TV
Pengadan dan pemasangan Splitter TV, berikut alat/material bantu lainnya sesuai Gambar dan Spesifikasi Teknis.
LANTAI 1
Splitter 7 ports bh 3,00 93.606,38 -
TB-Splitter-TV/LT.1 bh 1,00 96.126,42 -
Lantai 2
Splitter 7 ports bh 4,00 93.606,38 -
TB-Splitter-TV/LT.2 bh 1,00 96.126,42 -
Lantai 3
Splitter 7 ports bh 4,00 93.606,38 -
TB-Splitter-TV/LT.3 bh 1,00 96.126,42 -
c INSTALASI KABEL FEEDER SPLITTER TV
Instalasi Kabel Feeder Splitter TV menggunakan kabel coaxial berikut semua aksesoris, material / alat bantu
pemasangan sesuai detail Gambar dan Spesifikasi Teknis.
Lantai 1
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-Lt.1 mtr 10,00 38.842,58 -
Lantai 2 -
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-Lt.2 mtr 15,00 38.842,58 -
Lantai 3
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3 mtr 10,00 38.842,58 -
d TV OUTLET
Pengadan dan pemasangan TV Outlet, berikut alat/material bantu lainnya sesuai Gambar dan Spesifikasi teknis
Lantai 1
TV Outlet bh 12,00 72.543,38 -
Lantai 2
TV Outlet bh 16,00 72.543,38 -
Lantai 3
TV Outlet bh 16,00 72.543,38 -
e INSTALASI OUTLET TV
Instalasi kabel Outlet TV menggunakan kabel Coaxial 5C/2V dalam conduit PVC HI dia.20 mm2 lengkap dengan
bobokan dan perapihan kembali, peralatan bantu dan aksesoris sesuai detail Gambar dan Spesifikasi Teknis.

Lantai 1
TV Outlet ttk 10,00 717.766,86 -
Lantai 2
TV Outlet ttk 10,00 717.766,86 -
Lantai 3
TV Outlet ttk 10,00 717.766,86 -
II PEKERJAAN FIRE ALARM - -
a PERALATAN UTAMA FIRE ALARM SYSTEM
Pengadaan dan pemasangan peralatan Sistem Fire Alarm ditempatkan di Ruang Kontrol secara lengkap termasuk
pengkabelan dan koneksi meliputi peralatan sesuai diuraikan dlm Gambar dan Spesifikasi Teknis, tetapi tidak
terbats pada item sebagai berikut :
MCFA, kapasitas 10 Zone unit 1,00 10.952.748,16 - -
MDF, kapasitas 10 Zone set 1,00 6.647.997,54 -
Rectifier bh 1,00 1.539.166,89 -
Power Surge Arrester bh 1,00 1.304.630,38 -
Battery & Charger 4 jam bh 1,00 1.508.659,24 -
Grounding u/ MCFA dan Surge Arrester ( R < 0,5 Ohm ) lot 1,00 811.440,24 -

b INSTALASI KABEL FEEDER FIRE ALARM


INSTALASI FEEDER MELALUI RISER / SHAFT
Kabel NYA 5 x 2 x 2,5 mm2 in conduit Dia.32 dari MCFA ke MDF mtr 8,00 1.099.364,63 -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.1 mtr 2,00 1.099.364,63 -

Page 10
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.2 mtr 6,00 1.099.364,63 -
Kabel NYA 3 x 2 x 2,5 mm2 in conduit Dia.32 dari MDF ke TB-FA-LT.3 mtr 5,00 1.099.364,63 -

c PERALATAN PENGINDERA dan PENANDA KEBAKARAN


Pengadaan dan pemasangan peralatan pengindera dan penanda kebakaran berikut alat / material bantu lainnya
Gambar dan Spesifikasi Teknis.
Lantai 1
- Rate Of Rise Temperature - Heat detector bh 10,00 476.952,98 -
- Manual push button bh 1,00 198.921,38 -
- Lampu Indikator bh 1,00 40.948,88 -
- Bell alarm bh 1,00 241.047,38 -
- End of Line Resistor bh 2,00 46.214,63 -
- TB-FA-LT.1 bh 1,00 494.217,12 -
Lantai 2
- Rate Of Rise Temperature - Heat detector bh 10,00 476.952,98 -
- Manual push button bh 1,00 198.921,38 -
- Lampu Indikator bh 1,00 40.948,88 -
- Bell alarm bh 1,00 241.047,38 -
- End of Line Resistor bh 2,00 46.214,63 -
- TB-FA-LT.2 bh 1,00 494.217,12 -
Lantai 3
- Rate Of Rise Temperature - Heat detector bh 10,00 476.952,98 -
- Manual push button bh 1,00 198.921,38 -
- Lampu Indikator bh 1,00 40.948,88 -
- Bell alarm bh 1,00 241.047,38 -
- End of Line Resistor bh 2,00 46.214,63 -
- TB-FA-LT.3 bh 1,00 494.217,12 -
d PERALATAN PENGINDERA dan PENANDA KEBAKARAN
Instalasi titik detector dari TB-FA dengan kabel NYA 2 x 1,5 mm2 didalam conduit dia. 20 mm2 lengkap dengan
aksesoris dan semua peralatan / material bantu pemasangan sesuai detail Gambar dan Spesifikasi Teknis.
Lantai 1
- Rate Of Rise Temperature - Heat detector ttk 10,00 485.547,29 -
- Manual push button ttk 1,00 602.277,83 -
- Lampu Indikator ttk 1,00 824.943,83 -
- Bell alarm ttk 1,00 602.277,83 -
Lantai 2
- Rate Of Rise Temperature - Heat detector ttk 10,00 485.547,29 -
- Manual push button ttk 1,00 602.277,83 -
- Lampu Indikator ttk 1,00 824.943,83 -
- Bell alarm ttk 1,00 602.277,83 -
Lantai 3
- Rate Of Rise Temperature - Heat detector ttk 10,00 485.547,29 -
- Manual push button ttk 1,00 602.277,83 -
- Lampu Indikator ttk 1,00 824.943,83 -
- Bell alarm ttk 1,00 602.277,83 -
Testing & Comissioning included perijinan dari DEPNAKER lot 1,00 1.067.770,13 -

B.4. PEKERJAAN SARANA DAN PRASARANA LINGKUNGAN (LUAR BANGUNAN)


I PEKERJAAN INSTALASI PLAMBING
1, INSTALASI AIR BERSIH - -
PERALATAN UTAMA
Pengadaan dan pemasangan unit
1 Lift Pump bh 2,00 1.932.660,64 - -
Type : Centrifugal end suction
Kapasitas : 200 l/menit
Head : 36 mtr
Speed : 2900 rpm
Daya : 5,5 KW/380V/50Hz/3ph
1 duty, 1 standby ( bergantian ), lengkap dengan panel control, wlc di Tanki Air Atas dan accessories set 1,00 2.496.366,70 - -

2 Pompa Transfer WTP 01 A/B set 21.576.435,70 -


Debit : @3,6 m3 / jam
Head : 50 meter
Power : 2.2 kW/220V/1Ph/50Hz
Type : Centrifugal End Suction
Bekerja Secara Paralel Alternate
Sudah lengkap dengan base Frame dan pengkabelannya

2 Distribution Pump set 53.465.215,90


Type : Packaged Booster Pump -
Kapasitas : 2 x 150 l/menit
Head : 20 mtr
Speed : 1450 rpm
Daya : 2,2 KW/380V/50Hz/3ph
Operasi : Parallel Alternate
( lengkap dengan Pump & Electromotor, Pressure Tank, Panel Kontrol, Pressure switch, Presure Gauge,
Accessories, Gate Valve, Header & base Plat )
3 Tangki Air Atas ( Type Cylinder ) unit 2,00 4.322.197,81
Kapasitas : 2,5 m3
Glass Rainforcement Plastic (GRP), lengkap dengan Assesories dan dudukan/ pondasi
4 PEKERJAAN SHALLOW WELL unit 1,00 2.881.568,85
a Pembuatan / Pengeboran sumur shallow well
- Kedalaman + 50 Meter, Pipa Casing , Pipa GIP Medium dia 150mm, Pipa Rising dia 80mm, Pipa screen dia 80mm
b Pengadaan dan pemasangan pompa shallow well
- Kapasitas(deb air)150 s/d 200 Lpm, pengadaan dan pemasangan pipa konstruksi : 1 unit
c Instalasi kabel Kontrol WLC : 1 unit
d Instalasi Pipa GIP dia 50 mm ke GWT : 1 unit
e Gate Valve dia 2" : 1 unit
f Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm : 1 unit
g Panel kontrol shallow well type outdoor : 1 unit
h Pengujian kwalitas air ke laboratorium : 1 unit
i Testing Comissioning & Training : 1 unit
j Material & Alat Bantu : 1 unit
5 Ground Water Tank unit by sipil
Kapasitas : 25 m3
Rainforced Concrete Made
6 ACCESSORIES POMPA AIR BERSIH
- Gate Valve
dia. 80 ( Untuk Penghubung/penyeimbang GWT) bh 2,00 774.105,37 - -
dia. 50 bh 4,00 309.157,30 - -
- Check Valve ( CV )

Page 11
dia. 50 bh 2,00 190.000,90 - -
- Strainer ( STR ) -
dia. 50 bh 2,00 337.843,10 - -
- Flexible Joint ( FJ ) -
dia. 50 bh 4,00 369.838,80 - -
- Foot Valve -
dia. 50 bh 2,00 190.000,90 - -
- Pressure Gauge bh 2,00 - -
- GIP med dia. 100 ( pipa header ) m 2,00 512.566,73 - -
- Instalasi pemipaan area pompa lot 1,00 672.501,84 - -
c/w fiting-fitting & support. -
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1,00 1.564.231,26 - -
7 INSTALASI PEMIPAAN -
Pengadaan dan pemasangan unit. -
Pemipaan PVC AW (Incl. Fitting & All Accessories) -
a SITE PLAN -
1. Dari Box Meter PDAM ke GWT -
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m 10,00 80.661,49 - -
2. Pemipaan R.Pompa ke Tanki Air Atas -
- GIP dia. 65 m 46,00 194.949,90
b Penyambungan pipa PDAM, pipa gip dia. 65 termasuk lot tidak ditawarkan -
Perijinan.
2, INSTALASI AIR KOTOR & AIR BEKAS - -
Septic Tank Anaerobic Biological Filtration unit 37.089.937,00 -
Kapasitas : 9 m3 / hari -
Resapan unit 2,00 2.566.516,52 - -
Kapasitas : 5 m3 -
- Struktur Pondasi By Sipil -
Portable Grease Trap unit 44,00 597.055,81 -
Kapasitas -
TESTING COMMISSIONING lot 1,00 1.067.770,13 -

II. PENYAMBUNGAN DAYA PLN


Pekerjaan Pasang Baru Daya Listrik PLN 82 KVA va 3.941.000,00 -
- BP ( Biaya penyambungan )
- UJL ( Uang Jaminan Langanan )
- Biaya Instalatir
- Concuil
- Pemasangan dan material yang dibutuhkan, seperti : ( kabel, tiang, pondasi, galian & urugan kembali, dll )

III PEKERJAAN INSTALASI KABEL FEEDER - -


Kabel Distribusi Daya dari Panel Pompa - Air Bersih
- NYY 4 x 4 mm2 ke LP-1 m' 10,00 114.717,02 - -
- NYY 4 x 4 mm2 ke LP-2 m' 10,00 114.717,02 - -
- Proteksi Kabel dengan Pipa Gip Dia 100 Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya m' 20,00 46.225,00 - -
- Testing & Commissioning lot 1,00 1.067.770,13

TOTAL 703.999.041,20 100,00 6,21 7,02 13,23 13%


PPN 11% 77.439.894,53
TOTAL ( TERMASUK PPN) 781.438.935,73
Pembulatan 781.438.000,00

Disetujui Oleh : Diperiksa Oleh : Merauke, 10 December 2023


Pejabat Pembuat Komitmen KONSULTAN PENGAWAS Dibuat Oleh :
Rumah Susun dan Rumah Khusus CV. MEGA DALLES ENGINEERING PENYEDIA JASA KONSTRUKSI
Paket Perawatan Rumah Susun Polres Marauke CV. DUNSADA ENGINEERING

ADOLF LEONARD BATLOLONA, S.T MALIK ASO


NIP. 19740111 200502 1 004 Direktur DEREK WAINYAMBE, SH
Direktur

Page 12
LAPORAN KEMAJUAN
PEKERJAAN : PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)
TYPE : RUMAH SUSUN T-36 KDS-D
JUMLAH LANTAI : 3 LANTAI
LOKASI PEKERJAAN : JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PENYEDIA JASA KONSTRUKSI : CV. DUNSADA ENGINEERING
TAHUN ANGGARAN : 2023

KONTRAK MC NOL PROGRES MINGGUAN

NO. URAIAN PEKERJAAN M1 M2 M3 M4 M5 M6 M7 M8 M9 M10


BOBOT
JUMLAH HARGA 22/11/2023 27/11/2023 04/12/2023 11/12/2023 18/12/2023 25/12/2023 01/01/2024 08/01/2024 15/01/2024 22/01/2024
(%)
26/11/2023 03/12/2023 10/12/2023 17/12/2023 24/12/2023 31/12/2023 07/01/2024 14/01/2024 21/01/2024 28/01/2024

I. PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI


I.A PEKERJAAN PERSIAPAN STANDAR 500.000,00 0,07 0,04 0,04

I.B. PEKERJAAN RK3K KONSTRUKSI 2.500.000,00 0,36 0,18 0,18

II PEKERJAAN ARSITEKTUR STANDAR


1, PEKERJAAN LANTAI SATU

II.2 PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING 13.063.376,00 1,86 0,31 0,31 0,31 0,31 0,31 0,31

II.3 PEKERJAAN PLAFOND 20.042.799,00 2,85 0,47 0,47 0,47 0,47 0,47 0,47

II.6 PEKERJAAN PENGECATAN 246.384.686,60 35,00 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89
REncAnA
III PEKERJAAN LANTAI DUA KOnTRAK
6.236.123,17
II.3 PEKERJAAN PLAFOND 0,89 0,15 0,15 0,15 0,15 0,15 0,15

II.6 PEKERJAAN PENGECATAN 146.149.917,80 20,76 2,97 2,97 2,97 2,97 2,97 2,97 2,97

I PEKERJAAN LANTAI TIGA

I.3 PEKERJAAN PLAFOND 21.666.100,00 3,08 0,38 0,38 0,38 0,38 0,38 0,38 0,38 0,38

I.6 PEKERJAAN PENGECATAN 100.082.248,58 14,22 1,78 1,78 1,78 1,78 1,78 1,78 1,78 1,78

II PEKERJAAN LANTAI DAK DAN ATAP

II.1 PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 1.569.514,32 0,22 0,06 0,06 0,06 0,06

II.3 PEKERJAAN PLAFOND 17.335.571,60 2,46 0,62 REALISASI


0,62 0,62 0,62

II.4 PEKERJAAN LANTAI 37.055.388,72 5,26 1,32 1,32 1,32 1,32

II.7 PEKERJAAN PENUTUP ATAP 53.659.706,97 7,62 0,95 0,95 0,95 0,95 0,95 0,95 0,95 0,95

1.B PEKERJAAN ARSITEKTUR NON STANDART

1.B.2 PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.

II DRAINASE LUAR/SEKELILING BANGUNAN 34.915.104,41 4,96 2,48 2,48

2, INSTALASI KABEL FEEDER 2.838.504,04 0,40 0,20 0,20

Bobot Rencana Minggu Ini (%) 703.999.041,20 100,00 2,75 7,57 8,61 12,89 12,83 12,83 12,22 9,97 10,17 10,17
Bobot Komulatis Rencana s/d Minggu Ini (%) 2,75 10,32 18,92 31,81 44,64 57,47 69,69 79,66 89,83 100,00
Bobot Realisasi Minggu Ini (%) 6,21 7,02 22,55 14,53 8,49 9,73 9,73 10,56 11,17
Bobot Komulatis Realisasi s/d Minggu Ini (%) - 6,21 13,23
Deviasi Minggu Ini (%) - 2,75 - 1,36 4,62
Deviasi Komulatis s/d Minggu Ini (%) - 2,75 - 4,11 - 5,69

Disetujui Oleh : Diperiksa Oleh : Merauke, 10 December 2023


Pejabat Pembuat Komitmen KONSULTAN PENGAWAS Dibuat Oleh :
Rumah Susun dan Rumah Khusus CV. MEGA DALLES ENGINEERING PENYEDIA JASA KONSTRUKSI
Paket Perawatan Rumah Susun Polres Marauke CV. DUNSADA ENGINEERING

ADOLF LEONARD BATLOLONA, S.T MALIK ASO


NIP. 19740111 200502 1 004 Direktur DEREK WAINYAMBE, SH
Direktur

Page 13