PENYEDIA JASA KONSTRUKSI

BACK UP DATA QUANTITY KONSULTAN PENGAWAS

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 12 Mei 2023
TAHUN ANGGARAN : 2023

VOLUME VOLUME
NO. URAIAN PEKERJAAN SATUAN
KONTRAK BUCK UP

B. PEKERJAAN STRUKTUR LT. DASAR , 1, 2 , & 3


LANTAI 3 (ELEV. ±8.00 M)
IV. PEKERJAAN BETON
1, Balok B1 30/50 cm mutu beton fc 25 Mpa M3 55,88 54,85
2, Balok B2 25/45 cm mutu beton fc 25 Mpa M3 37,77 36,11
3, Plat lantai tebal 12 cm tulangan mutu beton fc 25 Mpa M3 92,05 90,95
4, Kolom K1 50x50 cm mutu beton fc 25 Mpa M3 22,58 17,25
5, Kolom K2 40x40 cm mutu beton fc 25 Mpa M3 1,28 1,66
6, Kolom K3 30x30 cm mutu beton fc 25 Mpa M3 2,05 2,18
7, Kolom lift KL 25x50 cm mutu beton fc 25 Mpa M3 3,75 2,81
8, Balok separator 25/45 cm mutu beton fc 25 Mpa M3 0,96 1,23
9, Ring Balok RB1 30/50 cm mutu beton fc 25 Mpa M3 13,50 13,20
10, Balok Konsol talang BK1 30/50 cm M3 1,80 0,56
11, Balok Konsol talang BK2 25/45 cm M3 1,44 0,21
12, Balok talang B2 25/45 cm mutu beton fc 25 Mpa M3 13,13 3,64
13, Balok atap tangga RB1 30/50 cm mutu beton fc 25 Mpa M3 3,60 4,10
14, Balok atap tangga B2 25/45 cm mutu beton fc 25 Mpa M3 1,96 1,85
15, Plat talang dan listplang beton tebal 10 cm tulangan Wiremesh M10 mutu beton fc 25 Mpa (elev. +12.00
M3m) 16,58 4,20
16, Plat atap lift beton tebal 12 cm tulangan Wiremesh M10 mutu beton fc 25 Mpa (elev. +13.00 m) M3 1,13 0,72

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok B1 30/50 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok B1 30/50 cm mutu beton fc 25 Mpa X 0,30 0,50 11,00 1,65 4,00 6,60
550 550 550 550 550 550
14

B1 30/50 cm
Y 0,30 0,50 15,70 2,36 3,00 7,07

550

550

550

550

550

550

550
Tumpuan Lapangan
550 550 550 550 550 550 88
13

X 0,30 0,50 33,93 5,09 1,00 5,09


0,30 0,50 33,38 5,01 1,00 5,01

550

550

550

550

550

550

550
50

50

3 3 0,30 0,50 33,88 5,08 1,00 5,08

5
550 550 550 297 203 550 550 88

56
12 0,30 0,50 33,00 4,95 1,00 4,95
11
30 30 10
Y 0,30 0,50 16,45 2,47 1,00 2,47

545

550

550

550

550

550

550
9

55
0
47

0,30 0,50 16,50 2,48 3,00 7,43


0
55

555 550 550 550 550 550 88


0,30 0,50 17,38 2,61 3,00 7,82
0

8
7

88

88

88
- -
0

55
55

0
6
0,30 0,50 11,00 1,65 1,00 1,65

5
55

56
55
47
0

0,30 0,50 11,30 1,70 1,00 1,70


5
4
0
55

26
0

55
55

0
0

47
26

3
0

J K L M N O P
26
0

55
0
55

0
0

55
26

2
0

DENAH BALOK LANTAI 3


55

0
55
0

SKALA NTS
1

A B C D F H

E G I

TOTAL VOLUME 54,85 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok B2 25/45 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok B2 25/45 cm mutu beton fc 25 Mpa X 0,25 0,45 11,36 1,28 1,00 1,28
14
0,25 0,45 11,60 1,31 2,00 2,61
B2 25/45 cm

283

283

283

283

283

283
Y 0,25 0,45 15,78 1,78 1,00 1,78
580 570 570 570 570 580
Tumpuan Lapangan 0,25 0,45 16,02 1,80 1,00 1,80

273

273

273

273

273

273
13

D 0,25 0,45 9,03 1,02 1,00 1,02

273

273

273

273

273

273

273
3 3
45

45

580 570 570 570 570 580 88


X 0,25 0,45 21,01 2,36 1,00 2,36

273

273

273

273

273

273

273
12
0,25 0,45 38,31 4,31 1,00 4,31
0,25 0,45 35,28 3,97 1,00 3,97

273

273

273

225

273

273
11
25 25 10 376 580 570 307 190
0,25 0,45 34,40 3,87 1,00 3,87
9
570 580 88

283

283

283

283

283

283
63 165
Y 0,25 0,45 20,34 2,29 1,00 2,29
8
3
24

63

63
7
58

240

240
0

43 3 303 570 580 88


0,25 0,45 16,58 1,87 1,00 1,87

376
3

0 47
23

6
560 0,25 0,45 21,38 2,41 1,00 2,41
3

5
27

3
24
0,25 0,45 16,10 1,81 1,00 1,81
4
58

58
0

0
3

0,25 0,45 13,30 1,50 1,00 1,50


27

23
28
3

0,25 0,45 17,21 1,94 1,00 1,94


3

3
27
58
0

J K L M N O P
58

0,25 0,45 11,65 1,31 1,00 1,31


0
27

3
27
3

2
27
58
0
3

DENAH BALOK LANTAI 3


28

SKALA NTS
1

A B C D F H

E G I

TOTAL VOLUME 36,11 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Plat lantai tebal 12 cm tulangan mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b h
m m m m2 m3 Unit Unit m3

Plat lantai tebal 12 cm tulangan mutu beton fc 25 Mpa 1 17,84 9,37 0,12 20,06 1,00 20,06
884 2766 2 13,26 3,13 0,12 4,98 1,00 4,98
3 12,50 6,29 0,12 9,44 1,00 9,44
4 18,50 8,84 0,12 124,47 14,94 1,00 14,94
9,66
5 27,66 18,50 0,12 61,41 1,00 61,41

966
88
6 12,40 0,88 0,12 1,31 1,00 1,31
7 16,30 0,88 0,12 13,82 1,66 1,00 1,66

1850
62
9 15,11

1240
Pengurangan
K1 0,50 0,50 0,12 0,03 (41,00) (1,23)
K3 0,27 0,30 0,12 0,01 (2,00) (0,02)
1511 KL 0,25 0,50 0,12 0,02 (3,00) (0,05)
12
26

50

0,25 0,25 0,12 0,01 (3,00) (0,02)


13

88
1630
B1 X 30,10 0,30 0,12 1,08 (1,00) (1,08)
B1 Y 32,02 0,30 0,12 1,15 (1,00) (1,15)
B2 X 34,56 0,25 0,12 1,04 (1,00) (1,04)
B2 Y 31,80 0,25 0,12 0,95 (1,00) (0,95)
31
3

B1 X 68,06 0,30 0,12 2,45 (1,00) (2,45)


B1 Y 65,45 0,30 0,12 2,36 (1,00) (2,36)
B2 X 125,24 0,25 0,12 3,76 (1,00) (3,76)
84
17

B2 Y 112,39 0,25 0,12 3,37 (1,00) (3,37)


B1 D 11,30 0,30 0,12 0,41 (1,00) (0,41)
93
7

Void 1 5,70 3,90 0,12 2,67 (1,00) (2,67)


Void 2 4,42 2,83 0,12 1,50 (1,00) (1,50)
Lift 2,73 2,38 0,12 0,78 (1,00) (0,78)

TOTAL VOLUME 90,95 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Kolom K1 50x50 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b h
m m m m2 m3 Unit Unit m3

Kolom K1 50x50 cm mutu beton fc 25 Mpa


14

K1 50/50 cm K1 0,50 0,50 4,00 1,00 16,00 16,00


0,50 0,50 5,00 1,25 1,00 1,25
TUMPUAN LAPANGAN
13
50

50

4 4

12
50 50
11
10
9

8
7

5
4

3
J K L M N O P

DENAH KOLOM LANTAI 3


SKALA NTS
1

A B C D F H

E G I

TOTAL VOLUME 17,25 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Kolom K2 40x40 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b h
m m m m2 m3 Unit Unit m3

Kolom K2 40x40 cm mutu beton fc 25 Mpa


14

K2 0,40 0,40 5,20 0,83 2,00 1,66

K3 40/40 cm
13
40

4 12

11
10
9

40 8
7

5
4

3
J K L M N O P

DENAH KOLOM LANTAI 3


SKALA NTS
1

A B C D F H

E G I

TOTAL VOLUME 1,66 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Kolom K3 30x30 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b h
m m m m2 m3 Unit Unit m3

Kolom K3 30x30 cm mutu beton fc 25 Mpa


14

K3 0,30 0,30 3,20 0,29 4,00 1,15 P. 13 & 14


K3 30/30 cm 0,30 0,30 2,50 0,23 2,00 0,45 Portal 3
0,30 0,30 3,20 0,29 2,00 0,58 Portal 5
13
30

4
12

30
11
10
9

8
7

5
4

3
J K L M N O P

DENAH KOLOM LANTAI 3


SKALA NTS
1

A B C D F H

E G I

TOTAL VOLUME 2,18 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Kolom lift KL 25x50 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b h
m m m m2 m3 Unit Unit m3

Kolom lift KL 25x50 cm mutu beton fc 25 Mpa


14

KL 0,25 0,50 5,00 0,63 3,00 1,88


0,25 0,25 5,00 0,31 3,00 0,94

50 13
25
50

12

4 10
11

25
7

5
4

3
J K L M N O P

DENAH KOLOM LANTAI 3


SKALA NTS
1

A B C D F H

E G I

TOTAL VOLUME 2,81 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok separator 25/45 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok separator 25/45 cm mutu beton fc 25 Mpa


X 0,25 0,45 2,03 0,23 1,00 0,23 Portal 12
203 0,25 0,45 1,90 0,21 1,00 0,21
25
KL 50 0,25 0,45 2,40 0,27 1,00 0,27
K1 50
12 50
Y 0,25 0,45 2,25 0,25 1,00 0,25 Portal M
0,25 0,45 2,37 0,27 1,00 0,27 Portal N

B2

3 BALOK SEPARATOR LIFT 25/45 cm

237
225
TIAP 2.50 mtr

25
9
KL 25
50 KL 25
50

190
M N

TOTAL VOLUME 1,23 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Ring Balok RB1 30/50 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Ring Balok RB1 30/50 cm mutu beton fc 25 Mpa X 0,30 0,50 27,50 4,13 2,00 8,25

Y 0,30 0,50 16,50 2,48 2,00 4,95


550 550 550
B1 30/50 cm

550

550
Tumpuan Lapangan

550

550
50

50

3 3

30 30

550

550
550 550 550 550 550

TOTAL VOLUME 13,20 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok Konsol talang BK1 30/50 cm
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok Konsol talang BK1 30/50 cm X 0,30 0,50 0,93 0,14 4,00 0,56

93

93

93

93

93

93
93 93
B1 30/50 cm
Tumpuan Lapangan
50

50

3 3
93 93

30 30
93
93

93

93

93

93
TOTAL VOLUME 0,56 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok Konsol talang BK2 25/45 cm
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok Konsol talang BK2 25/45 cm X 0,25 0,45 0,63 0,07 3,00 0,21

68

68

68
B2 25/45 cm
Tumpuan Lapangan

3 3 68 68
45

45

25 25
68 68

68

68

68

68
TOTAL VOLUME 0,21 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok talang B2 25/45 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok talang B2 25/45 cm mutu beton fc 25 Mpa 103 570 570 570 570 570 103
X 0,25 0,45 32,36 3,64 1,00 3,64

78

78
B2 25/45 cm

570

570
Tumpuan Lapangan

3 3

570

570
45

45

238
225
25 25

570

570
78

78
103 570 573 575 570 103
31 6
6 31
560

TOTAL VOLUME 3,64 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok atap tangga RB1 30/50 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok atap tangga RB1 30/50 cm mutu beton fc 25 Mpa 0,30 0,50 7,25 1,09 2,00 2,18 Tangga 1

0,30 0,50 6,40 0,96 2,00 1,92 Tangga 4


B1 30/50 cm

640
Tumpuan Lapangan
260 280
50

50

3 3

30 30
5
72
28
0

TOTAL VOLUME 4,10 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Balok atap tangga B2 25/45 cm mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b l
m m m m2 m3 Unit Unit m3

Balok atap tangga B2 25/45 cm mutu beton fc 25 Mpa 0,25 0,45 2,80 0,32 2,00 0,63 Tangga 1

B2 25/45 cm 0,25 0,45 2,80 0,32 2,00 0,63


Tangga 4
0,25 0,45 2,60 0,29 2,00 0,59

640
Tumpuan Lapangan
260 280

3 3
45

45

25 25
5
72
28
0

TOTAL VOLUME 1,85 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Plat talang dan listplang beton tebal 10 cm tulangan Wiremesh M10 mutu beton fc 25 Mpa
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b h
m m m m2 m3 Unit Unit m3

Plat talang dan listplang beton tebal 10 cm tulangan Wiremesh M10 mutu beton fc 25 Mpa (elev. +12.00 m)
3186

68

68
68
68 10
X 32,36 0,68 0,10 2,20 2,00 4,40
35

6D19
20

80
10

Pengurangan
2D16
45
50

2036
1850

1850
BK1 X 0,68 0,30 0,10 0,02 (4,00) (0,08)
3D19
30 25
(D10-100)
BK2 X 0,68 0,25 0,10 0,02 (7,00) (0,12)
118 68
68

68
3186
3236

TOTAL VOLUME 4,20 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b
BACK UP DATA ( QUANTITY )

NAMA PEKERJAAN : PEMBANGUNAN GEDUNG PERPUSTAKAAN IAIN FATTAHUL MULUK PAPUA


LOKASI : JL. MERAH PUTIH BUPER WAENA DISTRIK HERAM KOTA JAYAPURA PROVINSI PAPUA
NO. KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
TANGGAL KONTRAK : 1012/In.35/Rk/KU.00.2/05/2023
PENYEDIA JASA KONSTRUKSI : PT. KEMER TIRI EMAS URAIAN PEKERJAAN : PEKERJAAN BETON
KONSULTAN PENGAWAS : PT. SARANA BUDI PRAKARSARIPTI, PT. MAHAKARYA ABADI KONSULTAN, CV. ARTA JASA CONSULTANT, KSO ITEM PEKERJAAN : Plat atap lift beton tebal 12 cm tulangan Wiremesh M10 mutu beton fc 25 Mpa (elev. +13.0
TAHUN ANGGARAN : 2023 SATUAN : M3

DIMENSI JUMLAH JUMLAH JUMLAH


GAMBAR SKETSA LUAS VOL.

KODE
SISI TYPE VOLUME KET.
TANPA SKALA a b h
m m m m2 m3 Unit Unit m3

Plat atap lift beton tebal 12 cm tulangan Wiremesh M10 mutu beton fc 25 Mpa (elev. +13.00 m) 2,40 2,50 0,12 0,72 1,00 0,72

240

125

125
240

TOTAL VOLUME 0,72 M3

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


TIM PENGELOLA TEKNIS KONSULTAN PENGAWAS PENYEDIA JASA KONSTRUKSI
IAIN FATTAHUL MULUK PAPUA PT. SARANA BUDI PRAKARSARIPTI, PT. KEMER TIRI EMAS
PT. MAHAKARYA ABADI KONSULTAN,
CV. ARTA JASA CONSULTANT, KSO

JAENAL ARIFIN Ir. ERWIN, ST., MT ASRI EKA PUTRA, ST


NIP. 197505152014121004 Team Leader Project Manager
Pengatur Muda Tk. I-II/b