Anda di halaman 1dari 22

REPUBLIK INDONESIA

PT JASAMARGA TOLLROAD MAINTENANCE

BACK UP QUANTITY MC-03


PERIODE : ( 26 JULI 2019 - 25 AGUSTUS 2019 )

JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019

KONTRAK JASA PEMBORONGAN:


NOMOR : 07/KONTRAK-SMG/V/2019
TANGGAL : 15 MEI 2019

KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE

LAPORAN BULANAN MC-03


PERIODE : ( 26 JULI 2019 - 25 AGUSTUS 2019 )

JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019

KONTRAK JASA PEMBORONGAN:


NOMOR : 07/KONTRAK-SMG/V/2019
TANGGAL : 15 MEI 2019

KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE

BACK UP QUALITY MC-03


PERIODE : ( 26 JULI 2019 - 25 AGUSTUS 2019 )

JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019

KONTRAK JASA PEMBORONGAN:


NOMOR : 07/KONTRAK-SMG/V/2019
TANGGAL : 15 MEI 2019

KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE

REKAPITULASI PROGRESS
MONTHLY CERTIFICATE - 03
PERIODE : ( 26 JULI 2019 - 25 AGUSTUS 2019 )

JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019

KONTRAK JASA PEMBORONGAN:


NOMOR : 07/KONTRAK-SMG/V/2019
TANGGAL : 15 MEI 2019

KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE

MONTHLY CERTIFICATE - 03
PERIODE : ( 26 JULI 2019 - 25 AGUSTUS 2019 )

JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019

KONTRAK JASA PEMBORONGAN:


NOMOR : 07/KONTRAK-SMG/V/2019
TANGGAL : 15 MEI 2019

KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REKAPITULASI PEMBAYARAN PEKERJAAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
NILAI KONTRAK
S/D BULAN LALU BULAN INI S/D BULAN INI
NO URAIAN
JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%)

I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL


BAB I UMUM 19,033,250.00 0.89% - 0.00% 3,197,315.00 0.15% 3,197,315.00 0.15%
BAB 12 PEKERJAAN LAIN-LAIN 866,726,883.00 40.58% - 0.00% 59,045,360.00 2.76% 59,045,360.00 2.76%
JUMLAH I 885,760,133.00 41.47% - 0.00% 62,242,675.00 2.91% 62,242,675.00 2.91%
DIBULATKAN 885,760,000.00 - 62,242,000.00 62,242,000.00

II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER


BAB 3 PEMBONGKARAN 24,764,116.50 1.16% - 0.00% - 0.00% - 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 167,573,725.50 7.85% - 0.00% - 0.00% - 0.00%
JUMLAH II 192,337,842.00 9.01% - 0.00% - 0.00% - 0.00%
DIBULATKAN 192,337,000.00 - - -

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


BAB 3 PEMBONGKARAN 8,765,625.00 0.41% - 0.00% - 0.00% - 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 1,003,497,380.00 46.98% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%
BAB 13 PENCAHAYAAN 45,509,900.00 2.13% - 0.00% - 0.00% - 0.00%
JUMLAH III 1,057,772,905.00 49.52% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%
DIBULATKAN 1,057,772,000.00 - 96,000,000.00 96,000,000.00
A TOTAL BIAYA PEKERJAAN I + II + III ( Pembulatan) Non PPN 2,135,869,000.00 100.00% - 0.00% 158,242,000.00 7.41% 158,242,000.00 7.41%
B JUMLAH SERTIFIKAT S/D BULAN LALU -
C JUMLAH SERTIFIKAT BULAN INI 158,242,000.00 158,242,000.00
D PPN 10% (10% X C) - 15,824,200.00 15,824,200.00
E TOTAL SERTIFIKAT BULAN INI + PPN 10% (C+D) - 174,066,200.00 174,066,200.00
F POTONGAN
1. RETENSI (5% X C) - 7,912,100.00 7,912,100.00
2. PENGEMBALIAN UANG MUKA (15%XE)
G JUMLAH POTONGAN (F1+F2) - 7,912,100.00 7,912,100.00
H JUMLAH BERSIH SERTIFIKAT BULAN INI (E-G) - 166,154,100.00 166,154,100.00

TERBILANG : SERATUS ENAM PULUH ENAM JUTA SERATUS LIMA PULUH DELAPAN RIBU TIGA RATUS RUPIAH
S/D BULAN LALU 0.00%
PROSENTASE YANG TELAH TERCAPAI BULAN INI 7.41%
S/D BULAN INI 7.41%

Diketahui oleh, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,
Pemilik Proyek Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI

Florysco P. Siahaan Ir. APRIYANTO Bayu Ajie Jatmiko


Direktur Teknik Resident Engineer Direktur
STATUS JAMINAN & PAJAK

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

NO URAIAN JUMLAH (Rp.) KETERANGAN

I. STATUS KONTRAK
1 KONTRAK
a. NILAI KONTRAK Rp 2,135,869,000.00
b. PPN 10% Rp 213,586,900.00
c. TOTAL NILAI KONTRAK TERMASUK PPN Rp 2,349,455,900.00

2 PROGRES PEMBAYARAN
a. SAMPAI DENGAN BULAN LALU Rp -
b. BULAN INI Rp 158,242,000.00 Tidak Termasuk PPN
c. SAMPAI DENGAN BULAN INI Rp 158,242,000.00

II STATUS UANG MUKA


1 PENERIMAAN UANG MUKA TERMASUK PPN (10 % X NILAI KONTRAK ) Rp -

2 PENGEMBALIAN UANG MUKA (15% X TAGIHAN)


a. SAMPAI DENGAN BULAN LALU Rp -
b. BULAN INI Rp -
c. SAMPAI DENGAN BULAN INI Rp -

3 SISA UANG MUKA TERMASUK PPN Rp -

III STATUS JAMINAN PEMELIHARAAN / RETENSI 5 %


a. SAMPAI DENGAN BULAN LALU Rp -
b. BULAN INI Rp 7,912,100.00 Tidak Termasuk PPN
c. SAMPAI DENGAN BULAN INI Rp 7,912,100.00

IV STATUS PPN 10%


a. SAMPAI DENGAN BULAN LALU Rp -
b. BULAN INI Rp 15,824,200.00
c. SAMPAI DENGAN BULAN INI Rp 15,824,200.00

Diketahui oleh, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,
Pemilik Proyek Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI

Florysco P. Siahaan Ir. APRIYANTO Bayu Ajie Jatmiko


Direktur Teknik Resident Engineer Direktur
BERITA ACARA HASIL PEMERIKSAAN PEKERJAAN
JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS PADA RUAS JALAN TOL SEMARANG TAHUN 2019

Pada hari ini Jumat, tanggal Dua puluh delapan, bulan Juni tahun Dua Ribu Sembilan Belas (28-7=6-2019) yang bertanda tangan di bawah ini:

1. Nama : Purwanto, ST
Jabatan : Kepala Pelaksana
PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS PADA RUAS JALAN TOL SEMARANG TAHUN 2019
Alamat : PT. Wasilo Karya Abadhi
Jl. Gusti Putri II No. 5 , Semarang

2. Nama : Ir. Apriyanto A.S


Jabatan : Resident Engineer
PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS PADA RUAS JALAN TOL SEMARANG TAHUN 2019
Alamat : PT. Yodya Karya
Jl. Sriwijaya No. 41 Semarang 50251

3. Nama : Alif Aditya Suwandaru


Jabatan : Manager Area
PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS PADA RUAS JALAN TOL SEMARANG TAHUN 2019
Alamat : PT. Jasamarga Tollroad Maintenance
Area Semarang

Dari hasil Pemeriksaan Pekerjaan, kemajuan fisik yang telah dicapai sampai dengan saat ini dan telah disetujui adalah sebagi berikut:

PROGRESS
PEKERJAAN
S/D BULAN LALU BULAN INI S/D BULAN LALU
I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL
BAB I UMUM 0.00% 0.15% 0.15%
BAB 12 PEKERJAAN LAIN-LAIN 0.00% 2.76% 2.76%

II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER


BAB 3 PEMBONGKARAN 0.00% 0.00% 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 0.00% 0.00% 0.00%

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


BAB 3 PEMBONGKARAN 0.00% 0.00% 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 0.00% 4.49% 4.49%
BAB 13 PENCAHAYAAN 0.00% 0.00% 0.00%
KEMAJUAN PEKERJAAN 0.00% 7.41% 7.41%
KEMAJUAN PEKERJAAN MC 01 7.41%

Demikian Berita Acara ini dibuat, untuk dapat dipergunakan sebagaimana mestinya.

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO A.S Purwanto, ST


Manager Area Semarang Resident Engineer Kepala Pelaksana
REKAPITULASI PRESTASI

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROSENTASE
MATA PEMBAYARAN URAIAN S/D BULAN LALU BULAN INI (%) S/D BULAN INI (%)
(%)

I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL


BAB I UMUM 0.00% 0.15% 0.15%
BAB 12 PEKERJAAN LAIN-LAIN 0.00% 2.76% 2.76%
JUMLAH I 0.00% 2.91% 2.91%

II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER


BAB 3 PEMBONGKARAN 0.00% 0.00% 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 0.00% 0.00% 0.00%
JUMLAH II 0.00% 0.00% 0.00%

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


BAB 3 PEMBONGKARAN 0.00% 0.00% 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 0.00% 4.49% 4.49%
BAB 13 PENCAHAYAAN 0.00% 0.00% 0.00%
JUMLAH III 0.00% 4.49% 4.49%
JUMLAH I + II + III 0.00% 7.41% 7.41%
Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,
Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Manager Area Semarang Resident Engineer Kepala Pelaksana
REKAP PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%)
(Rp.) (Rp.) (Rp.)

I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL


BAB I UMUM
SK 1.02 (2) Pengamanan Dan Pengaturan Lalu Lintas, Tipe B Lump Sum 1.00 14,533,250.00 14,533,250.00 0.68% - - 0.00% 0.22 3,197,315.00 0.15% 0.22 3,197,315.00 0.15%
1.35 As Built Drawing Lump Sum 1.00 4,500,000.00 4,500,000.00 0.21% - - 0.00% - - 0.00% - - 0.00%

BAB 12 PEKERJAAN LAIN-LAIN


12.05 (1) Guardrail m` 840.00 738,067.00 619,976,280.00 29.03% - - 0.00% 80.00 59,045,360.00 2.76% 80.00 59,045,360.00 2.76%
12.05 (2) End Section Guardrail buah 92.00 386,100.00 35,521,200.00 1.66% - - 0.00% - - 0.00% - - 0.00%
SK 2.01 Pengecatan Guardrail m` 8865.50 23,826.00 211,229,403.00 9.89% - - 0.00% - - 0.00% - - 0.00%

JUMLAH I 885,760,133.00 41.47% - 0.00% 62,242,675.00 2.91% 62,242,675.00 2.91%


DIBULATKAN 885,760,000.00 - 62,242,000.00 62,242,000.00
II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER
BAB 3 PEMBONGKARAN
3.01 (4) a Pembongkaran Patok Kilometer Buah 150.00 165,094.11 24,764,116.50 1.16% - - 0.00% - - 0.00% - - 0.00%

BAB 12 PEKERJAAN LAIN-LAIN


12.09 (6) Kilometer Post, Tipe A Buah 150.00 1,117,158.17 167,573,725.50 7.85% - - 0.00% - - 0.00% - - 0.00%

JUMLAH II 192,337,842.00 9.01% - 0.00% - 0.00% - 0.00%


DIBULATKAN 192,337,000.00 - - -
III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS
BAB 3 PEMBONGKARAN
3.01 (4) Pembongkaran Rambu Lalu Lintas Buah 3.00 2,921,875.00 8,765,625.00 0.41% - - 0.00% 0.00% - 0.00% 0.00% - 0.00%
REKAP PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%)
(Rp.) (Rp.) (Rp.)

BAB 12 PEKERJAAN LAIN-LAIN


PASANG BARU
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 1.00 11,000,000.00 11,000,000.00 0.52% - - 0.00% - - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 2.00 13,500,000.00 27,000,000.00 1.26% - - 0.00% - - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 1.00 15,000,000.00 15,000,000.00 0.70% - - 0.00% - - 0.00% - - 0.00%
12.06 (4) Rambu Petunjuk, Peringatan & Larangan, Tipe A-4 Buah 8.00 24,000,000.00 192,000,000.00 8.99% - - 0.00% 4.00 96,000,000.00 4.49% 4.00 96,000,000.00 4.49%
12.06 (5) Rambu Petunjuk, Peringatan & Larangan, Tipe B-1 Buah 2.00 46,500,000.00 93,000,000.00 4.35% - - 0.00% - - 0.00% - - 0.00%
12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 10.00 1,200,000.00 12,000,000.00 0.56% - - 0.00% - - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 7.00 1,750,000.00 12,250,000.00 0.57% - - 0.00% - - 0.00% - - 0.00%
12.07 (4) Rambu Petunjuk, Tipe C-1 Buah 8.00 1,750,000.00 14,000,000.00 0.66% - - 0.00% - - 0.00% - - 0.00%
12.07 (7) Rambu Masif Buah 7.00 1,850,000.00 12,950,000.00 0.61% - - 0.00% - - 0.00% - - 0.00%
PENGGATIAN PANEL
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 9.00 6,000,000.00 54,000,000.00 2.53% - - 0.00% - - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 5.00 7,250,000.00 36,250,000.00 1.70% - - 0.00% - - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 6.00 8,350,000.00 50,100,000.00 2.35% - - 0.00% - - 0.00% - - 0.00%
12.06 (4) Rambu Petunjuk, Peringatan & Larangan, Tipe A-4 Buah 1.00 13,000,000.00 13,000,000.00 0.61% - - 0.00% - - 0.00% - - 0.00%
12.06 (5) Rambu Petunjuk, Peringatan & Larangan, Tipe B-1 Buah 3.00 25,500,000.00 76,500,000.00 3.58% - - 0.00% - - 0.00% - - 0.00%
12.06 (7) Rambu Petunjuk, Peringatan & Larangan, Tipe C-1 Buah 6.00 28,300,000.00 169,800,000.00 7.95% - - 0.00% - - 0.00% - - 0.00%
12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 20.00 900,000.00 18,000,000.00 0.84% - - 0.00% - - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 16.00 900,000.00 14,400,000.00 0.67% - - 0.00% - - 0.00% - - 0.00%
12.07 (4) Rambu Petunjuk, Tipe C-1 Buah 15.00 900,000.00 13,500,000.00 0.63% - - 0.00% - - 0.00% - - 0.00%
PENINGGIAN TIANG
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 2.00 2,500,000.00 5,000,000.00 0.23% - - 0.00% - - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 3.00 3,500,000.00 10,500,000.00 0.49% - - 0.00% - - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 4.00 6,800,000.00 27,200,000.00 1.27% - - 0.00% - - 0.00% - - 0.00%
12.06 (4) Rambu Petunjuk, Peringatan & Larangan, Tipe A-4 Buah 1.00 9,000,000.00 9,000,000.00 0.42% - - 0.00% - - 0.00% - - 0.00%
12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 4.00 950,000.00 3,800,000.00 0.18% - - 0.00% - - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 2.00 950,000.00 1,900,000.00 0.09% - - 0.00% - - 0.00% - - 0.00%
PENGGANTIAN STICKER
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 1.00 5,000,000.00 5,000,000.00 0.23% - - 0.00% - - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 1.00 6,100,000.00 6,100,000.00 0.29% - - 0.00% - - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 1.00 6,800,000.00 6,800,000.00 0.32% - - 0.00% - - 0.00% - - 0.00%
12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 13.00 280,000.00 3,640,000.00 0.17% - - 0.00% - - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 13.00 760,000.00 9,880,000.00 0.46% - - 0.00% - - 0.00% - - 0.00%
12.07 (4) Rambu Petunjuk, Tipe C-1 Buah 14.00 740,000.00 10,360,000.00 0.49% - - 0.00% - - 0.00% - - 0.00%
REKAP PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%)
(Rp.) (Rp.) (Rp.)

LAIN-LAIN
12.09 (1) Guide Post, Tipe A Buah 200.00 127,886.56 25,577,312.00 1.20% - - 0.00% - - 0.00% - - 0.00%
12.09 (2) Guide Post, Tipe B Buah 200.00 106,022.84 21,204,568.00 0.99% - - 0.00% - - 0.00% - - 0.00%
Pembongkaran Rambu Buah 3.00 1,000,000.00 3,000,000.00 0.14% - - 0.00% - - 0.00% - - 0.00%
SK 2.02 (7) Pemindahan Rambu Petunjuk, Peringatan & Larangan, Tipe C-1 Buah 1.00 9,000,000.00 9,000,000.00 0.42% - - 0.00% - - 0.00% - - 0.00%
SK 2.03 Pengecatan Tiang Rambu Buah 100.00 107,855.00 10,785,500.00 0.50% - - 0.00% - - 0.00% - - 0.00%

BAB 13 PENCAHAYAAN
13.01 (15) Kabel NFYGBY 4C - 10 mm2 m` 230.00 150,000.00 34,500,000.00 1.62% - - 0.00% - - 0.00% - - 0.00%
13.01 (6) Lampu Kedip ( Flashing Light ) buah 2.00 5,504,950.00 11,009,900.00 0.52% - - 0.00% - - 0.00% - - 0.00%

JUMLAH III 1,057,772,905.00 49.52% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%


DIBULATKAN 1,057,772,000.00 - 96,000,000.00 96,000,000.00
JUMLAH DIBULATKAN I+II+III 2,135,869,000.00 100.00% - 0.00% 158,242,000.00 7.41% 158,242,000.00 7.41%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang
REKAPITULASI PROGRESS PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
(Rp.) (Rp.) (Rp.) (Rp.)

I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL


BAB I UMUM 19,033,250.00 0.89% - 0.00% 3,197,315.00 0.15% 3,197,315.00 0.15%
BAB 12 PEKERJAAN LAIN-LAIN 866,726,883.00 40.58% - 0.00% 59,045,360.00 2.76% 59,045,360.00 2.76%
JUMLAH I 885,760,133.00 41.47% - 0.00% 62,242,675.00 2.91% 62,242,675.00 2.91%
DIBULATKAN 885,760,000.00 - 62,242,000.00 62,242,000.00

II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER


BAB 3 PEMBONGKARAN 24,764,116.50 1.16% - 0.00% - 0.00% - 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 167,573,725.50 7.85% - 0.00% - 0.00% - 0.00%
JUMLAH II 192,337,842.00 9.01% - 0.00% - 0.00% - 0.00%
DIBULATKAN 192,337,000.00 - - -

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


BAB 3 PEMBONGKARAN 8,765,625.00 0.41% - 0.00% - 0.00% - 0.00%
BAB 12 PEKERJAAN LAIN-LAIN 1,003,497,380.00 46.98% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%
BAB 13 PENCAHAYAAN 45,509,900.00 2.13% - 0.00% - 0.00% - 0.00%
JUMLAH III 1,057,772,905.00 49.52% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%
DIBULATKAN 1,057,772,000.00 - 96,000,000.00 96,000,000.00
JUMLAH I + II + III 2,135,870,880.00 100.00% - 0.00% 158,242,675.00 7.41% 158,242,675.00 7.41%
JUMLAH DIBULATKAN 2,135,869,000.00 - 158,242,000.00 158,242,000.00
Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,
Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Manager Area Semarang Resident Engineer Kepala Pelaksana
SERTIFIKAT BULANAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
NILAI KONTRAK
S/D BULAN LALU BULAN INI S/D BULAN INI
NO URAIAN
JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%)

I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL 885,760,133.00 41.47% - 0.00% 62,242,675.00 2.91% 62,242,675.00 2.91%
DIBULATKAN 885,760,000.00 - 62,242,000.00 62,242,000.00
II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER 192,337,842.00 9.01% - 0.00% - 0.00% - 0.00%
DIBULATKAN 192,337,000.00 - - -
III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS 1,057,772,905.00 49.52% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%
DIBULATKAN 1,057,772,000.00 - 96,000,000.00 96,000,000.00
A TOTAL BIAYA PEKERJAAN I + II + III ( Non PPN) 2,135,870,880.00 100.00% - 0.00% 158,242,675.00 7.41% 158,242,675.00 7.41%
TOTAL BIAYA PEKERJAAN I + II + III ( Pembulatan) 2,135,869,000.00 - 158,242,000.00 158,242,000.00
B JUMLAH SERTIFIKAT S/D BULAN LALU -
C JUMLAH SERTIFIKAT BULAN INI 158,242,000.00 158,242,000.00
D PPN 10% (10% X C) - 15,824,200.00 15,824,200.00
E TOTAL SERTIFIKAT BULAN INI + PPN 10% (C+D) - 174,066,200.00 174,066,200.00
F POTONGAN
1. RETENSI (5% X C) - 7,912,100.00 7,912,100.00
2. PENGEMBALIAN UANG MUKA (15%XE)
G JUMLAH POTONGAN (F1+F2) - 7,912,100.00 7,912,100.00
H JUMLAH BERSIH SERTIFIKAT BULAN INI (E-G) - 166,154,100.00 166,154,100.00

TERBILANG : SERATUS ENAM PULUH ENAM JUTA SERATUS LIMA PULUH DELAPAN RIBU TIGA RATUS RUPIAH
S/D BULAN LALU 0.00%
PROSENTASE YANG TELAH TERCAPAI BULAN INI 7.41%
S/D BULAN INI 7.41%
Diketahui oleh, Dibuat dan Diajukan oleh,
Pemilik Proyek Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT WASILO KARYA ABADHI

Florysco P. Siahaan Bayu Ajie Jatmiko


Direktur Teknik Direktur
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL


BAB I UMUM
SK 1.02 (2) Pengamanan Dan Pengaturan Lalu Lintas, Tipe B Lump Sum 1.00 14,533,250.00 14,533,250.00 0.68% - - 0.00% 0.22 3,197,315.00 0.15% 0.22 3,197,315.00 0.15%
1.35 As Built Drawing Lump Sum 1.00 4,500,000.00 4,500,000.00 0.21% - - 0.00% - - 0.00% - - 0.00%

TOTAL PEKERJAAN I. BAB I UMUM 19,033,250.00 0.89% - 0.00% 3,197,315.00 0.15% 3,197,315.00 0.15%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.) BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.)

I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL


BAB 12 PEKERJAAN LAIN-LAIN
12.05 (1) Guardrail m` 840.00 738,067.00 619,976,280.00 29.03% - - 0.00% 80.00 59,045,360.00 2.76% 80.00 59,045,360.00 2.76%
12.05 (2) End Section Guardrail buah 92.00 386,100.00 35,521,200.00 1.66% - - 0.00% - - 0.00% - - 0.00%
SK 2.01 Pengecatan Guardrail m` 8865.50 23,826.00 211,229,403.00 9.89% - - 0.00% - - 0.00% - - 0.00%

TOTAL PEKERJAAN I. BAB 12 PEKERJAAN LAIN-LAIN 866,726,883.00 40.58% - 0.00% 59,045,360.00 2.76% 59,045,360.00 2.76%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER


BAB 3 PEMBONGKARAN
3.01 (4) a Pembongkaran Patok Kilometer Buah 150.00 165,094.11 24,764,116.50 1.16% - - 0.00% - 0.00% - - 0.00%

TOTAL PEKERJAAN II. BAB 3 PEMBONGKARAN 24,764,116.50 1.16% - 0.00% - 0.00% - 0.00%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER


BAB 12 PEKERJAAN LAIN-LAIN
12.09 (6) Kilometer Post, Tipe A Buah 150.00 1,117,158.17 167,573,725.50 7.85% - - 0.00% - 0.00% - - 0.00%

TOTAL PEKERJAAN II. BAB 12 PEKERJAAN LAIN-LAIN 167,573,725.50 7.85% - 0.00% - 0.00% - 0.00%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


BAB 3 PEMBONGKARAN
3.01 (4) Pembongkaran Rambu Lalu Lintas Buah 3.00 2,921,875.00 8,765,625.00 0.41% - - 0.00% - 0.00% - - 0.00%

TOTAL PEKERJAAN III. BAB 3 PEMBONGKARAN 8,765,625.00 0.41% - 0.00% - 0.00% - 0.00%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


BAB 12 PEKERJAAN LAIN-LAIN
PASANG BARU
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 1.00 11,000,000.00 11,000,000.00 0.52% - - 0.00% - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 2.00 13,500,000.00 27,000,000.00 1.26% - - 0.00% - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 1.00 15,000,000.00 15,000,000.00 0.70% - - 0.00% - 0.00% - - 0.00%
12.06 (4) Rambu Petunjuk, Peringatan & Larangan, Tipe A-4 Buah 8.00 24,000,000.00 192,000,000.00 8.99% - - 0.00% 4.00 96,000,000.00 4.49% 4.00 96,000,000.00 4.49%
12.06 (5) Rambu Petunjuk, Peringatan & Larangan, Tipe B-1 Buah 2.00 46,500,000.00 93,000,000.00 4.35% - - 0.00% - 0.00% - - 0.00%
12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 10.00 1,200,000.00 12,000,000.00 0.56% - - 0.00% - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 7.00 1,750,000.00 12,250,000.00 0.57% - - 0.00% - 0.00% - - 0.00%
12.07 (4) Rambu Petunjuk, Tipe C-1 Buah 8.00 1,750,000.00 14,000,000.00 0.66% - - 0.00% - 0.00% - - 0.00%
12.07 (7) Rambu Masif Buah 7.00 1,850,000.00 12,950,000.00 0.61% - - 0.00% - 0.00% - - 0.00%
PENGGATIAN PANEL
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 9.00 6,000,000.00 54,000,000.00 2.53% - - 0.00% - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 5.00 7,250,000.00 36,250,000.00 1.70% - - 0.00% - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 6.00 8,350,000.00 50,100,000.00 2.35% - - 0.00% - 0.00% - - 0.00%
12.06 (4) Rambu Petunjuk, Peringatan & Larangan, Tipe A-4 Buah 1.00 13,000,000.00 13,000,000.00 0.61% - - 0.00% - 0.00% - - 0.00%
12.06 (5) Rambu Petunjuk, Peringatan & Larangan, Tipe B-1 Buah 3.00 25,500,000.00 76,500,000.00 3.58% - - 0.00% - 0.00% - - 0.00%
12.06 (7) Rambu Petunjuk, Peringatan & Larangan, Tipe C-1 Buah 6.00 28,300,000.00 169,800,000.00 7.95% - - 0.00% - 0.00% - - 0.00%
12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 20.00 900,000.00 18,000,000.00 0.84% - - 0.00% - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 16.00 900,000.00 14,400,000.00 0.67% - - 0.00% - 0.00% - - 0.00%
12.07 (4) Rambu Petunjuk, Tipe C-1 Buah 15.00 900,000.00 13,500,000.00 0.63% - - 0.00% - 0.00% - - 0.00%
PENINGGIAN TIANG
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 2.00 2,500,000.00 5,000,000.00 0.23% - - 0.00% - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 3.00 3,500,000.00 10,500,000.00 0.49% - - 0.00% - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 4.00 6,800,000.00 27,200,000.00 1.27% - - 0.00% - 0.00% - - 0.00%
12.06 (4) Rambu Petunjuk, Peringatan & Larangan, Tipe A-4 Buah 1.00 9,000,000.00 9,000,000.00 0.42% - - 0.00% - 0.00% - - 0.00%
12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 4.00 950,000.00 3,800,000.00 0.18% - - 0.00% - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 2.00 950,000.00 1,900,000.00 0.09% - - 0.00% - 0.00% - - 0.00%
PENGGANTIAN STICKER
12.06 (1) Rambu Petunjuk, Peringatan & Larangan, Tipe A-1 Buah 1.00 5,000,000.00 5,000,000.00 0.23% - - 0.00% - 0.00% - - 0.00%
12.06 (2) Rambu Petunjuk, Peringatan & Larangan, Tipe A-2 Buah 1.00 6,100,000.00 6,100,000.00 0.29% - - 0.00% - 0.00% - - 0.00%
12.06 (3) Rambu Petunjuk, Peringatan & Larangan, Tipe A-3 Buah 1.00 6,800,000.00 6,800,000.00 0.32% - - 0.00% - 0.00% - - 0.00%
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


12.07 (1) Rambu Petunjuk, Tipe A-1 Buah 13.00 280,000.00 3,640,000.00 0.17% - - 0.00% - 0.00% - - 0.00%
12.07 (2) Rambu Petunjuk, Tipe A-2 Buah 13.00 760,000.00 9,880,000.00 0.46% - - 0.00% - 0.00% - - 0.00%
12.07 (4) Rambu Petunjuk, Tipe C-1 Buah 14.00 740,000.00 10,360,000.00 0.49% - - 0.00% - 0.00% - - 0.00%
LAIN-LAIN
12.09 (1) Guide Post, Tipe A Buah 200.00 127,886.56 25,577,312.00 1.20% - - 0.00% - 0.00% - - 0.00%
12.09 (2) Guide Post, Tipe B Buah 200.00 106,022.84 21,204,568.00 0.99% - - 0.00% - 0.00% - - 0.00%
Pembongkaran Rambu Buah 3.00 1,000,000.00 3,000,000.00 0.14% - - 0.00% - 0.00% - - 0.00%
SK 2.02 (7) Pemindahan Rambu Petunjuk, Peringatan & Larangan, Tipe C-1 Buah 1.00 9,000,000.00 9,000,000.00 0.42% - - 0.00% - 0.00% - - 0.00%
SK 2.03 Pengecatan Tiang Rambu Buah 100.00 107,855.00 10,785,500.00 0.50% - - 0.00% - 0.00% - - 0.00%

TOTAL PEKERJAAN III. BAB 12 PEKERJAAN LAIN-LAIN 1,003,497,380.00 46.98% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang
PRESTASI & PEMBAYARAN

NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019

PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)

III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS


BAB 13 PENCAHAYAAN
13.01 (15) Kabel NFYGBY 4C - 10 mm2 m` 230.00 150,000.00 34,500,000.00 1.62% - - 0.00% - 0.00% - - 0.00%
13.01 (6) Lampu Kedip ( Flashing Light ) buah 2.00 5,504,950.00 11,009,900.00 0.52% - - 0.00% - 0.00% - - 0.00%

TOTAL PEKERJAAN III. BAB 13 PENCAHAYAAN 45,509,900.00 2.13% - 0.00% - 0.00% - 0.00%

Mengetahui, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,


Pengguna Jasa Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Area Semarang

ALIF ADITYA SUWANDARU Ir. APRIYANTO Purwanto, ST


Resident Engineer Kepala Pelaksana
Manager Area Semarang