JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019
KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE
JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019
KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE
JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019
KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE
REKAPITULASI PROGRESS
MONTHLY CERTIFICATE - 03
PERIODE : ( 26 JULI 2019 - 25 AGUSTUS 2019 )
JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019
KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REPUBLIK INDONESIA
PT JASAMARGA TOLLROAD MAINTENANCE
MONTHLY CERTIFICATE - 03
PERIODE : ( 26 JULI 2019 - 25 AGUSTUS 2019 )
JASA PEMBORONGAN
PEKERJAAN GUARDRAIL, PATOK KILOMETER
DAN RAMBU LALU LINTAS
PADA RUAS JALAN TOL SEMARANG
TAHUN 2019
KONTRAKTOR PELAKSANA
PT. WASILO KARYA ABADHI
REKAPITULASI PEMBAYARAN PEKERJAAN
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
NILAI KONTRAK
S/D BULAN LALU BULAN INI S/D BULAN INI
NO URAIAN
JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%)
TERBILANG : SERATUS ENAM PULUH ENAM JUTA SERATUS LIMA PULUH DELAPAN RIBU TIGA RATUS RUPIAH
S/D BULAN LALU 0.00%
PROSENTASE YANG TELAH TERCAPAI BULAN INI 7.41%
S/D BULAN INI 7.41%
Diketahui oleh, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,
Pemilik Proyek Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
I. STATUS KONTRAK
1 KONTRAK
a. NILAI KONTRAK Rp 2,135,869,000.00
b. PPN 10% Rp 213,586,900.00
c. TOTAL NILAI KONTRAK TERMASUK PPN Rp 2,349,455,900.00
2 PROGRES PEMBAYARAN
a. SAMPAI DENGAN BULAN LALU Rp -
b. BULAN INI Rp 158,242,000.00 Tidak Termasuk PPN
c. SAMPAI DENGAN BULAN INI Rp 158,242,000.00
Diketahui oleh, Diperiksa dan Disetujui oleh, Dibuat dan Diajukan oleh,
Pemilik Proyek Konsultan Supervisi Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT YODYA KARYA PT WASILO KARYA ABADHI
Pada hari ini Jumat, tanggal Dua puluh delapan, bulan Juni tahun Dua Ribu Sembilan Belas (28-7=6-2019) yang bertanda tangan di bawah ini:
1. Nama : Purwanto, ST
Jabatan : Kepala Pelaksana
PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS PADA RUAS JALAN TOL SEMARANG TAHUN 2019
Alamat : PT. Wasilo Karya Abadhi
Jl. Gusti Putri II No. 5 , Semarang
Dari hasil Pemeriksaan Pekerjaan, kemajuan fisik yang telah dicapai sampai dengan saat ini dan telah disetujui adalah sebagi berikut:
PROGRESS
PEKERJAAN
S/D BULAN LALU BULAN INI S/D BULAN LALU
I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL
BAB I UMUM 0.00% 0.15% 0.15%
BAB 12 PEKERJAAN LAIN-LAIN 0.00% 2.76% 2.76%
Demikian Berita Acara ini dibuat, untuk dapat dipergunakan sebagaimana mestinya.
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROSENTASE
MATA PEMBAYARAN URAIAN S/D BULAN LALU BULAN INI (%) S/D BULAN INI (%)
(%)
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%)
(Rp.) (Rp.) (Rp.)
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%)
(Rp.) (Rp.) (Rp.)
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%) VOLUME JUMLAH HARGA (Rp.) BOBOT (%)
(Rp.) (Rp.) (Rp.)
LAIN-LAIN
12.09 (1) Guide Post, Tipe A Buah 200.00 127,886.56 25,577,312.00 1.20% - - 0.00% - - 0.00% - - 0.00%
12.09 (2) Guide Post, Tipe B Buah 200.00 106,022.84 21,204,568.00 0.99% - - 0.00% - - 0.00% - - 0.00%
Pembongkaran Rambu Buah 3.00 1,000,000.00 3,000,000.00 0.14% - - 0.00% - - 0.00% - - 0.00%
SK 2.02 (7) Pemindahan Rambu Petunjuk, Peringatan & Larangan, Tipe C-1 Buah 1.00 9,000,000.00 9,000,000.00 0.42% - - 0.00% - - 0.00% - - 0.00%
SK 2.03 Pengecatan Tiang Rambu Buah 100.00 107,855.00 10,785,500.00 0.50% - - 0.00% - - 0.00% - - 0.00%
BAB 13 PENCAHAYAAN
13.01 (15) Kabel NFYGBY 4C - 10 mm2 m` 230.00 150,000.00 34,500,000.00 1.62% - - 0.00% - - 0.00% - - 0.00%
13.01 (6) Lampu Kedip ( Flashing Light ) buah 2.00 5,504,950.00 11,009,900.00 0.52% - - 0.00% - - 0.00% - - 0.00%
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
(Rp.) (Rp.) (Rp.) (Rp.)
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
NILAI KONTRAK
S/D BULAN LALU BULAN INI S/D BULAN INI
NO URAIAN
JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%) JUMLAH HARGA (Rp.) BOBOT (%)
I. PEKERJAAN PENGADAAN DAN PERBAIKAN GUARDRAIL 885,760,133.00 41.47% - 0.00% 62,242,675.00 2.91% 62,242,675.00 2.91%
DIBULATKAN 885,760,000.00 - 62,242,000.00 62,242,000.00
II. PEKERJAAN PENGADAAN DAN PEMASANGAN PATOK KILOMETER 192,337,842.00 9.01% - 0.00% - 0.00% - 0.00%
DIBULATKAN 192,337,000.00 - - -
III. PEKERJAAN PENGADAAN DAN PEMASANGAN RAMBU LALU LINTAS 1,057,772,905.00 49.52% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%
DIBULATKAN 1,057,772,000.00 - 96,000,000.00 96,000,000.00
A TOTAL BIAYA PEKERJAAN I + II + III ( Non PPN) 2,135,870,880.00 100.00% - 0.00% 158,242,675.00 7.41% 158,242,675.00 7.41%
TOTAL BIAYA PEKERJAAN I + II + III ( Pembulatan) 2,135,869,000.00 - 158,242,000.00 158,242,000.00
B JUMLAH SERTIFIKAT S/D BULAN LALU -
C JUMLAH SERTIFIKAT BULAN INI 158,242,000.00 158,242,000.00
D PPN 10% (10% X C) - 15,824,200.00 15,824,200.00
E TOTAL SERTIFIKAT BULAN INI + PPN 10% (C+D) - 174,066,200.00 174,066,200.00
F POTONGAN
1. RETENSI (5% X C) - 7,912,100.00 7,912,100.00
2. PENGEMBALIAN UANG MUKA (15%XE)
G JUMLAH POTONGAN (F1+F2) - 7,912,100.00 7,912,100.00
H JUMLAH BERSIH SERTIFIKAT BULAN INI (E-G) - 166,154,100.00 166,154,100.00
TERBILANG : SERATUS ENAM PULUH ENAM JUTA SERATUS LIMA PULUH DELAPAN RIBU TIGA RATUS RUPIAH
S/D BULAN LALU 0.00%
PROSENTASE YANG TELAH TERCAPAI BULAN INI 7.41%
S/D BULAN INI 7.41%
Diketahui oleh, Dibuat dan Diajukan oleh,
Pemilik Proyek Kontraktor Pelaksana
PT JASAMARGA TOLLROAD MAINTENANCE PT WASILO KARYA ABADHI
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
TOTAL PEKERJAAN I. BAB I UMUM 19,033,250.00 0.89% - 0.00% 3,197,315.00 0.15% 3,197,315.00 0.15%
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN
(Rp.)
JUMLAH HARGA
(Rp.) BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.)
TOTAL PEKERJAAN I. BAB 12 PEKERJAAN LAIN-LAIN 866,726,883.00 40.58% - 0.00% 59,045,360.00 2.76% 59,045,360.00 2.76%
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
TOTAL PEKERJAAN II. BAB 3 PEMBONGKARAN 24,764,116.50 1.16% - 0.00% - 0.00% - 0.00%
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
TOTAL PEKERJAAN II. BAB 12 PEKERJAAN LAIN-LAIN 167,573,725.50 7.85% - 0.00% - 0.00% - 0.00%
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
TOTAL PEKERJAAN III. BAB 3 PEMBONGKARAN 8,765,625.00 0.41% - 0.00% - 0.00% - 0.00%
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%) VOLUME JUMLAH HARGA BOBOT (%)
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
TOTAL PEKERJAAN III. BAB 12 PEKERJAAN LAIN-LAIN 1,003,497,380.00 46.98% - 0.00% 96,000,000.00 4.49% 96,000,000.00 4.49%
NAMA PROYEK : JASA PEMBORONGAN PEKERJAAN GUARDRAIL, PATOK KILOMETER DAN RAMBU LALU LINTAS TAHUN 2019
LOKASI : RUAS JALAN TOL SEMARANG
NO. KONTRAK / TGL : 07/KONTRAK-SMG/V/2019 (15 MEI 2019)
NO. SPMK / TGL : 230/DIR II/EXT/JMTM/V/2019 ( 20 MEI 2019 )
PEMILIK PROYEK : PT JASAMARGA TOLLROAD MAINTENANCE
KONTRAKTOR : PT. WASILO KARYA ABADHI
KONSULTAN : PT YODYA KARYA (Persero)
NO. SERTIFIKAT : 01 ( SATU )
BULAN : JUNI 2019
PERIODE : 20 MEI - 25 JUNI 2019
PROGRESS
KONTRAK PENAWARAN
S/D BULAN LALU BULAN INI S/D BULAN INI
MATA PEMBAYARAN URAIAN SATUAN
HARGA SATUAN JUMLAH HARGA JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%) JUMLAH HARGA BOBOT (%)
VOLUME BOBOT (%) VOLUME VOLUME VOLUME
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
TOTAL PEKERJAAN III. BAB 13 PENCAHAYAAN 45,509,900.00 2.13% - 0.00% - 0.00% - 0.00%