ASPAL
1 Aspal drum 0 km kg 11,900
2 Aspal drum 1 - 20 km kg 12,000
3 Aspal drum 21 - 40 km kg 12,100
4 Aspal drum 41 - 60 km kg 12,200
5 Aspal drum 61 km keatas kg 12,300
6 Aspal curah kg 11,900
7 Kerosene 0 km liter 16,400
8 Kerosene 1 - 20 km liter 16,500
9 Kerosene 21 - 40 km liter 16,600
10 Kerosene 41 - 60 km liter 16,700
11 Kerosene 61 km keatas liter 16,800
SEMEN
1 Semen Putih/Warna 0 km kg 5,500
2 Semen Putih/Warna 1 - 20 km kg 5,600
3 Semen Putih/Warna 21 - 40 km kg 5,700
4 Semen Putih/Warna 41 - 60 km kg 5,800
5 Semen Putih/Warna 61 km keatas kg 5,900
6 Portland Cement (PC) 0 km kg 2,100
7 Portland Cement (PC) 1 - 20 km kg 2,200
8 Portland Cement (PC) 21 - 40 km kg 2,300
9 Portland Cement (PC) 41 - 60 km kg 2,400
10 Portland Cement (PC) 61 km keatas kg 2,500
11 Kapur Basah kg 11,100
12 Kapur Kering Keranjang 12,900
13 Floor Harderner kg 98,800
14 Bahan Tambah, Superplastiser kg 40,000
KACA
1 Kaca Bening Tebal 5 mm Sq. Feet 28,200
2 Kaca Bening Tebal 6 mm Sq. Feet 38,500
3 Kaca Bening Tebal 8 mm Sq. Feet 53,800
4 Kaca Rayband Sedang Tebal 5 mm Sq. Feet 33,100
5 Kaca Rayband 60% Tebal 5 mm Sq. Feet 33,800
6 Kaca Netral Tebal 5 mm Sq. Feet 33,800
7 Kaca Buram / Susu Tebal 5 mm Sq. Feet 36,500
8 Kaca Patri / Stained Glass Sq. Feet 133,500
9 Glass Block / Blok Kaca Buah 36,500
10 Kaca Nako Bening Standar Tebal 5 mm Lembar 33,100
11 Kaca Nako Buram Standar Tebal 5 mm Lembar 36,400
PASIR
1 Sirtu Darat 0 km M3 110,900
2 Sirtu Darat 1 - 20 km M3 248,000
3 Sirtu Darat 21 - 40 km M3 333,700
4 Sirtu Darat 41 - 60 km M3 438,800
5 Sirtu Darat 61 km keatas M3 590,900
6 Tanah Timbun 0 km M3 66,500
7 Tanah Timbun 1 - 20 km M3 203,600
NO NAMA BARANG/JASA SPESIFIKASI SATUAN HARGA SATUAN
1 Pekerja OH 122,100.00
2 Tukang OH 179,600.00
3 Mandor OH 201,100.00
7 Supir OH 179,600.00
9 Mekanik OH 215,500.00
Volume
No Uraian Pekerjaan Tinggi Banyak Jumlah Sat
Panjang (m) Lebar (m) Koefisien
(m) (Unit)
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lahan - - - 1 1 Ls
2 Pekerjaan Timbunan Tanah (secara mekanis)
150.6 13 0.5 1.4 - 1,370 m3
62.2 13 0.5 1.4 - 566 m3
86.5 13 0.5 1.4 - 787 m3
337.5 13 0.5 1.4 - 3,071 m3
500 13 2 1.4 - 18,200 m3
23,994 m3
3 Pekerjaan Perataan Tanah dan Pemadatan (secara mekanis) - - - 1 1 Ls
II PEKERJAAN DRAINASE
1 Pekerjaan Galian Drainase 5,391 1.5 0.8 - 2 12,938 m3
2 Pekerjaan Dinding Drainase
a Pemasangan Bekisting 5,391 - 1.0 - 4 21,564 m2
7,188 m2
b Pemasangan Besi
Tulangan Ø10 mm - - 1.20 - 26,955 64,692 m1
26,955 - - - 5.00 269,550 m1
334,242 m1
207,230 kg
c Beton K 250 5,391 0.15 1.3 - 4 4,205 m3
5,391 0.2 1.1 - 2 2,372 m3
6,577 m3
3 Pekerjaan Plesteran Dinding 5,391 0.15 - - 4 3,235 m2
5,391 - 1.10 - 6 35,581 m2
38,815 m2
III PEKERJAAN JEMBATAN - - - - 1 1.00 unit
IV PEKERJAAN SALURAN AIR GORONG-GORONG - - - - 2 2.00 unit
V PEKERJAAN JALAN LINGKAR
1 Pekerjaan Penghamparan Sirtu t=10 cm 5,400 10 0.1 1.40 - 7,560 m3
2 Pekerjaan Pemadatan Sirtu (secara mekanis) - - - 1 1 Ls
3 Pekerjaan Penghamparan Base B t=30 cm 5,400 10 0.3 1.40 - 22,680 m3
4 Pekerjaan Pemadatan Base B (secara mekanis) - - - 1 1 Ls
5 Pekerjaan Penghamparan Base A t=20 cm 5,400 8 0.2 1.40 - 12,096 m3
6 Pekerjaan Pemadatan Base A (secara mekanis) - - - 1 1 Ls
7 Pekerjaan Penghamparan Hotmix ACWC t=10 cm 5,400 8 0.1 1.40 - 6,048 m3
8 Pekerjaan Pemadatan Hotmix (secara mekanis) - - - 1 1 Ls
9 Pekerjaan Finishing Pemadatan (secara mekanis) - - - 1 1 Ls
10 Pekerjaan Marka Jalan - - - 1 1 Ls
RENCANA ANGGARAN BIAYA
Harga Satuan
No Uraian Pekerjaan Analisa Volume Sat Jumlah Harga (Rp)
(Rp)
I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan Lahan Taksir 1.00 Ls 20,000,000 20,000,000
2 Pekerjaan Timbunan Tanah (secara mekanis) Taksir 23994.425 m3 95,000.00 2,279,470,375.00
3 Pekerjaan Perataan Tanah dan Pemadatan (secara mekanis) Taksir 1.00 Ls 50,000,000.00 50,000,000.00
TOTAL I 2,349,470,375.00
II PEKERJAAN DRAINASE
1 Pekerjaan Galian Drainase A.2.3.1.2. 12938.4 m3 136,780.43 1,769,719,850.82
2 Pekerjaan Dinding Drainase
a Pemasangan Bekisting A.4.1.1.21 7188 m2 469,377.22 3,373,883,421.42
b Pemasangan Besi A.4.1.1.17 207230.04 kg 24,612.52 5,100,453,193.26
c Beton K 250 Taksir 6577.02 m3 1,650,000.00 10,852,083,000.00
3 Pekerjaan Plesteran Dinding A.4.4.2.4. 38815.2 m2 99,114.82 3,847,161,561.26
TOTAL II 24,943,301,026.76
III PEKERJAAN JEMBATAN Taksir 1.00 unit 1,550,000,000.00 1,550,000,000.00
TOTAL III 1,550,000,000.00
IV PEKERJAAN SALURAN AIR GORONG-GORONG Taksir 2.00 unit 35,000,000.00 70,000,000.00
TOTAL IV 70,000,000.00
V PEKERJAAN JALAN LINGKAR
1 Pekerjaan Penghamparan Sirtu t=10 cm Taksir 7560 m3 390,000.00 2,948,400,000.00
2 Pekerjaan Pemadatan Sirtu (secara mekanis) Taksir 1.00 Ls 15,000,000.00 15,000,000.00
3 Pekerjaan Penghamparan Base B t=30 cm Taksir 22680 m3 750,000.00 17,010,000,000.00
4 Pekerjaan Pemadatan Base B (secara mekanis) Taksir 1.00 Ls 15,000,000.00 15,000,000.00
5 Pekerjaan Penghamparan Base A t=20 cm Taksir 12096 m3 775,000.00 9,374,400,000.00
6 Pekerjaan Pemadatan Base A (secara mekanis) Taksir 1.00 Ls 15,000,000.00 15,000,000.00
7 Pekerjaan Penghamparan Hotmix ACWC t=10 cm Taksir 6048 m3 785,000.00 4,747,680,000.00
8 Pekerjaan Pemadatan Hotmix (secara mekanis) Taksir 1.00 Ls 15,000,000.00 15,000,000.00
9 Pekerjaan Finishing Pemadatan (secara mekanis) Taksir 1.00 Ls 10,000,000.00 10,000,000.00
10 Pekerjaan Marka Jalan Taksir 1.00 Ls 15,000,000.00 15,000,000.00
TOTAL V 34,165,480,000.00
JUMLAH KESELURUHAN 63,078,251,401.76
PPN 10% 6307825140.17597
TOTAL 69,386,076,541.94
PEMBULATAN 69,386,076,000.00
REKAPITULASI BIAYA
JUMLAH HARGA
NO URAIAN PEKERJAAN
(RP)
JUMLAH 63,078,251,401.76
TOTAL 69,386,076,541.94
PEMBULATAN 69,386,076,000.00
Terbilang: Enam puluh sembilan milyar tiga ratus delapan puluh enam juta tujuh puluh enam ribu rupiah
ANALISA HARGA SATUAN PEKERJAAN
Tambahan 1 Timbunan Tanah 1 m3 dengan Excavator dan material atau hasil galian dimuat ke DT
A TENAGA
Pekerja L.01 jam 0.1630
Mandor L.04 jam 0.0163
B BAHAN
Timbunan Tanah m3 1.20
C PERALATAN
Excavator jam 0.0372
Jumlah
Overhead & Profit (Contoh 15%)
Harga Satuan Pekerjaan
D Jumlah (A+B+C)
E Overhead & Profit 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
G Harga Satuan Pekerjaan per Kg
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15 %) 15% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)
PEKERJAAN
15,263 2,488
25,138 410
66,500 79,800
755,500 28,120
110,817
16,623
127,440
Harga Jumlah
Satuan Harga
122,100.00 109,890.00
201,100.00 9,049.50
118,939.50
118,939.50
17,840.93
136,780.43 136,780.43
Satuan Harga
(Rp) (Rp)
122,100.00 8,547.00
179,600.00 12,572.00
215,500.00 1,508.50
201,100.00 804.40
LAH TENAGA KERJA 23,431.90
17,700.00 185,850.00
31,600.00 4,740.00
LAH HARGA BAHAN 190,590.00
214,021.90
xD 32,103.29
246,125.19
24,612.52 24,612.52
Harga Jumlah
Satuan Harga
122,100.00 63,492.00
179,600.00 46,696.00
215,500.00 5,603.00
201,100.00 5,228.60
6,038,100.00 271,714.50
36,400.00 10,920.00
45,000.00 4,500.00
408,154.10
xD 61,223.12
469,377.22 469,377.22
Harga Jumlah
Satuan Harga
122,100.00 36,630.00
179,600.00 26,940.00
215,500.00 3,232.50
201,100.00 3,016.50
2,200.00 13,728.00
265,400.00 6,369.60
89,916.60
xD 9,198.22 13,487.49
99,114.82 99,114.82