Nama Pekerjaan : Pembangunan Rumah Susun RSUD Ir.

Soekarno

HPS 21,528,563,000.00

No Nama Peserta Nilai Penawaran Persentase ( % )

1 PT. LUBUK INDAH 17,185,049,436 79.82%


2 PT. ANUGERAH BANGUN KENCANA 17,213,867,651 79.96%
3 PT. RISKAINDO JAYA 17,222,336,532 80.00%
4 PT. MITRA TARULI PERKASA 17,222,850,400 80.00%
5 PT. YUDHA PERKASA UTAMA 17,222,850,400 80.00%
6 PT. INTISHAR BERKAH GLOBALINDO 17,222,850,400 80.00%
7 PT. ANDICA PARSAKTIAN ABADI 17,222,850,400 80.00%
8 PT BINTANG MILENIUM PERKASA 17,222,850,400 80.00%
9 PT. LOGOS CONSTRUCTION 19,375,703,250 90.00%

Nama Pekerjaan : Pembangunan Rumah Susun Bakamla RI

HPS 28,577,898,945.00

No Nama Peserta Nilai Penawaran Persentase ( % )

1 SIHYONG JAYA PERSADA PT 22,862,319,156 80.000000000000%


2 PT. MITRA TARULI PERKASA 22,862,319,156 80.000000000000%
3 PT. ANDICA PARSAKTIAN ABADI 22,862,319,156 80.000000000000%
4 PT.MURDA JAYA ABADI 22,862,319,157.23 80.000000004304%
5 PT.TIUR MULTI PERSADA 22,862,327,262.78 80.000028367306%
6 PT. SUMBER BAYAK KREASI 24,106,527,944.49 84.353744797280%
7 PT. BORIANDY PUTRA 24,197,899,257.37 84.673471985958%
8 PT. HEXINDO MULTI UTAMA 26,294,192,533.48 92.008837262966%
9 PT. NAIRUZ SYIFA MUMTAZA 26,862,831,870.45 93.998624329064%
R E K A P I T U L A S I
LAPORAN KEMAJUAN PEKERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PONDOK PESANTREN AL QURAN

TIPOLOGI : BARAK SUPER MINI 2 LANTAI

LOKASI : KABUPATEN REMBANG


TAHUN ANGARAN : 2022
MINGGU KE- : 03 (22 AGUSTUS 2022 - 28 AGUSTUS 2022)

PRESTASI TERLAMBAT / LEBIH


No. JENIS PEKERJAAN BOBOT PEKERJAAN (%) SKEDUL (%)
TERCAPAI (%) CEPAT (%)

I. PEKERJAAN PERSIAPAN DAN PEKERJAAN RK3K KONSTRUKSI

I.A. PEKERJAAN PERSIAPAN 2.042 0.286 1.562 1.276

I.B. PEKERJAAN RK3K KONSTRUKSI 0.925 0.130 0.299 0.169

II. PEKERJAAN STRUKTUR, ARSITEKTUR DAN ME

II.A. PEKERJAAN STANDART

II.A. (1) PEKERJAAN STRUKTUR STANDART 29.806 0.000 0.000 0.000

II.A. (2) PEKERJAAN ARSITEKTUR STANDART 33.475 0.000 0.000 0.000

II.A. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR 4.301 0.000 0.000 0.000

II.B. PEKERJAAN NON STANDART

II.B. (1) PEKERJAAN STRUKTUR NON STANDART 15.128 1.891 1.904 0.013

II.B. (2) PEKERJAAN ARSITEKTUR NON STANDART 9.879 0.000 0.000 0.000

II.B. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART 4.443 0.000 0.000 0.000

JUMLAH 100.000

RENCANA KERJA
RENCANA KERJA (KOMULATIF) 2.31
REALISASI KERJA
REALISASI KERJA (KOMULATIF) 3.76
DEVIASI (+/-) 1.458
REKAPITULASI VOLUME BETON DAN BESI TULANGAN
Pekerjaan : #REF!
Jumlah Lantai : #REF!
Lokasi : KDS-E
Tahun Anggaran : #REF!

VC-WS KOMPONEN KOLOM

Vol. Beton Vol. Baja Tot. Vol


NO. LANTAI…. ITEM PEKERJAAN BEGISTING (M2) Tulangan
(M3) (kg) (Kg/m3)

1 K-1 65.28 6.44 1,478.96 229.510


LT.1 K-2 228.48 20.62 5,338.92 258.909
K-3 15.3 1.45 342.63 236.314

K-1 38.4 3.92 869.08 221.479


LT.2 K-2 134.4 12.56 3,019.29 240.451
3 K-3 9 0.88 193.91 219.627

K-2 77.952 7.72 1,874.93 242.917


LT. DAK K-3 5.22 0.54 120.30 221.678

TOTAL REKAPITULASI VOLUME VC DAN WS KOMPONEN KOLOM


VOLUME BETON (Vc) : 71.50 M3
VOLUME BESI TULANGAN (Ws) : 17,320.30 KG
VOLUME BESI TULANGAN / VOLUME BETON (WS/Vc) (KG/M3) : 242.23 KG/M3

VC-WS KOMPONEN BALOK LANTAI

Vol. Total Beton Vol. Total Baja Tot. Vol


NO. LANTAI…. ITEM PEKERJAAN BEGISTING (M2) Tulangan
(M3) (Kg) (Kg/m3)

G1.1 129.49 8.36 1,757.173 210.238


G1.2 157.55 10.93 2,407.924 220.224
2 LT.2 G1.3 29.9 1.69 394.037 233.158
G1.4 27.6 1.89 418.602 221.015
G1.5 10.35 0.69 203.392 293.072
G2.1 3.382 0.18 47.662 267.879
B1.1 36.8 2.53 449.384 177.342
B1.2 5.98 0.39 453.012 1,161.569
B1.3 13.225 0.89 531.635 594.670
B2.1 2 0.11 217.669 2,016.462

G1.1 67.39 4.04 1,243.644 307.985


LT.DAK
G1.2 117.875 8.17 2,243.165 274.427
G1.3 11.96 0.44 121.978 275.969
G1.5 10.35 0.69 189.443 272.972
G2.1 3.382 0.18 52.864 297.116
B1.1 36.8 2.53 449.384 177.342
B1.2 5.98 0.39 351.146 900.374
B1.3 13.225 0.89 432.904 484.233
B2.1 2 0.11 217.669 2,016.462

4 RING BALK G1.6 247.5 13.82 3,191.344 230.855


G1.7 24.75 0.86 200.566 173.289
B2.1 2 0.11 220.216 23.783

TOTAL REKAPITULASI VOLUME VC DAN WS KOMPONEN BALOK


VOLUME BETON (Vc) : 86.62 M3
VOLUME BESI TULANGAN (Ws) : 22,254.52 KG
VOLUME BESI TULANGAN / VOLUME BETON (WS/Vc) (KG/M3) : 256.91 KG/M3

VC-WS KOMPONEN PELAT LANTAI

Vol. Beton Vol. Baja Tot. Vol


NO. LANTAI…. ITEM PEKERJAAN BEGISTING (m2) Tulangan
(M3) (kg) (Kg/m3)

1 LT.DASAR Tebal 100 mm 12.25 58.70 4,974.39 84.743

2 LT. 2 Tebal 130 MM 459.46 69.13 6,959.83 100.676

3 LT.3 Tebal 130 MM 443.44 68.50 6,709.40 97.946

4 LT.DAK Tebal 130 MM 88.59 11.03 1,248.41 113.234

TOTAL REKAPITULASI VOLUME VC DAN WS KOMPONEN PELAT


VOLUME BETON (Vc)
VOLUME BESI TULANGAN (Ws)
LUAS AREA LANTAI (A)
VOLUME BETON / LUAS (Vc/A) (M3/M2)
VOLUME BESI TULANGAN / VOLUME BETON (WS/Vc) (KG/M3)

Vol. Beton Vol. Baja Tot. Vol


NO. LANTAI…. ITEM PEKERJAAN BEGISTING (m2) Tulangan
(M3) (kg) (Kg/m3)

1 LANTAI.1 CANOPY LT.1 79.06 6.43 953.96 148.300

2 LANTAI.2 CANOPY LT.2 79.06 6.43 953.96 148.300

3 LANTAI.3 CANOPY LT.3 79.06 6.43 953.96 148.300

VC-WS KOMPONEN TANGGA


Vol. Beton Vol. Baja Tot. Vol
NO. LANTAI…. ITEM PEKERJAAN Begisting (m2) Tulangan
(M3) (kg) (Kg/m3)

1 LT.1, 2 & 3 Tangga lt.1 18 6.66 1,212.327 181.902


balok tangga 20/35 5.4 0.24 88.701 373.321

jumlah 2 Tangga lt.2 36 13.33 2424.65 181.90


VOLUME KOMPONEN STRUKTUR
Pekerjaan : PERENCANAAN BARAK PANJANG
Tipe Prototipe : BARAK PANJANG 3 LT
Jumlah Lantai : 3 LANTAI
Lokasi : KDS-D
Tahun Anggaran : #REF!

KOLOM LT.DSR,
TIPE K1
B 300 mm
H 500 mm
L 5500 mm
n (jml) 8 bh SATUAN TOTAL
Vol. Beton Vol. Baja Vol. Beton Vol. Baja
DIMENSI TUL.LENTUR TUL.GESER (Vc) (Ws) (Vc) (Ws) Rasio
beton/luas Rasio besi/vol Prosentase
n Berat Berat (m3/m2) (kg/m3) Penulangan
b (m) h (m) n Kolom n Lantai H (m) (tulangan) D (mm) 40.D (m) As (mm2) (kg/m') Berat (kg) Lokasi s (mm) n D (mm) As (mm2) (kg/m') P (m) Berat (kg) (m3) (kg) (m3) (kg)

0.3 0.5 8 1 5.5 10 16 0.64 201.06 1.576 96.79 Ujung 100 27 13 132.73 1.041 1.58 44.39 0.806 174.10 6.444 1478.96
tbl lt 0.13
tgg blk 0.40 Tengah 150 16 13 132.73 1.041 1.58 26.31 229.51 2.68%
selimut beton 0.04 774.28305 TULANGAN KE PILECAP
hook tulangan sengkang 0.07 Joint 0 0 0 0.00 0.000 0.00 0.00 T = PILECAP 0.5 0.68
Berat
Lokasi n Ø (mm) As (mm2) (kg/m') P (m) Berat (kg) 10.77

Luas Bekisting 8.16 Hook ver 0 0 10 78.54 0.616 0.00 0.00


ujung
Total A bekisting 65.28 Hook hor 1 27 10 78.54 0.616 0.25 4.16
Hook ver 0 0 10 78.54 0.616 0.00 0.00
tengah
Hook hor 1 16 10 78.54 0.616 0.25 2.46
VOLUME KOMPONEN STRUKTUR
Pekerjaan : PEMBANGUNAN RUMAH SUSUN PONPES BARAK PANJANG
Tipe Prototipe : Err:509
Jumlah Lantai : 2 LANTAI
Lokasi : KDS-D
Tahun Anggaran : 2019

VOL PILE CAP


DIMENSI PILE CAP (mm) Jumlah tebal Jumlah Pondasi
Jumlah Lantai galian urugan pasir,
No Tipe Kedalaman Komponen Urugan dalam Lantai Kerja
Pondasi Kerja tanah m3
b h t
PC Pasir Komponen PC
1 P-1 2500 2500 600 1.2 18 18 0.05 0.1 1 20.25 5.63 11.25
2 P-2 2500 2500 600 1.2 2 2 0.05 0.1 1 2.25 0.63 1.25
- P-2A 800 800 600 1.2 2 2 0.05 0.1 1 0.72 0.06 0.13
3 P-3 5100 2600 600 1.2 10 10 0.05 0.1 1 22.95 6.63 13.26
32.00

TOTAL
1 P-1 VC TOTAL WS TOTAL WS/VC {KG) BEGISTING
2500 x 2500
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
2.5 2.5 0.6 3.13 atas / arah panjang 17 13.00 132.73 150 1.041 3.615 61.455 63.95 56.25 5965.7279 106.05738 108
tebal pelat : 0.1 m atas / arah pendek 17 13.00 132.73 150 1.041 3.615 61.455 63.95
tebal selimut : 0.075 m bawah / arah panj. 17 16.00 201.06 150 1.576 3.615 61.455 96.87
bawah / arah pendek 17 16.00 201.06 150 1.576 3.615 61.455 96.87
Pinggang 2 10.00 78.54 0.616 5.28 10.560 6.50
Bendrat 3.28
Luas BEGISTING 6 m2 Tot. Vol 331.43
Waste 0% 0.00
Grand Tot. Vol 331.43
Rasio besi/vol (kg/m3) 106.06
Rasio beton/luas (m3/m2) 0.52

TOTAL
2 P-2 VC TOTAL WS TOTAL WS/VC (KG) BEGISTING
2500 x 2500
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
2.5 2.5 0.6 3.13 atas / arah panjang 17 13.00 132.73 150 1.041 3.615 61.455 63.95 6.89 789.01172 311.62966 15.84
tebal pelat : 0.1 m atas / arah pendek 17 13.00 132.73 150 1.041 3.615 61.455 63.95
tebal selimut : 0.075 m bawah / arah panj. 17 16.00 201.06 150 1.576 3.615 61.455 96.87
bawah / arah pendek 17 16.00 201.06 150 1.576 3.615 61.455 96.87
Pinggang 2 10.00 78.54 0.616 5.28 10.560 6.50
Bendrat 3.28
Luas 6 m2 Tot. Vol 331.43 TOTAL ALL
Waste 0% 0.00 7.53 915.16479 121.53583 19.68
Grand Tot. Vol 331.43
Rasio besi/vol (kg/m3) 106.06
Rasio beton/luas (m3/m2) 0.52

TOTAL
- P-2A VC TOTAL WS TOTAL WS/VC (KG) BEGISTING
800 x 800
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
0.8 0.8 0.6 0.32 atas / arah panjang 6 13.00 132.73 150 1.041 1.915 11.490 11.96 0.64 126.15307 197.11417 3.84
tebal pelat : 0.1 m atas / arah pendek 6 13.00 132.73 150 1.041 1.915 11.490 11.96
tebal selimut : 0.075 m bawah / arah panj. 6 16.00 201.06 150 1.576 1.915 11.490 18.11
bawah / arah pendek 6 16.00 201.06 150 1.576 1.915 11.490 18.11
Pinggang 2 10.00 78.54 0.616 1.88 3.760 2.32
Bendrat 0.62
Luas 1.92 m2 Tot. Vol 63.08
Waste 0% 0.00
Grand Tot. Vol 63.08
Rasio besi/vol (kg/m3) 197.11
Rasio beton/luas (m3/m2) 0.17
TOTAL
3 P-3 VC TOTAL WS TOTAL WS/VC {KG) BEGISTING
5100 x 2600
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
5.1 2.6 0.6 6.63 atas / arah panjang 35 13.00 132.73 150 1.041 6.215 217.525 226.36 66.3 7616.0678 114.87282 92.4
tebal pelat : 0.1 m atas / arah pendek 18 13.00 132.73 150 1.041 3.715 66.870 69.59
tebal selimut : 0.075 m bawah / arah panj. 35 16.00 201.06 150 1.576 6.215 217.525 342.89
bawah / arah pendek 18 16.00 201.06 150 1.576 3.715 66.870 105.41
Pinggang 2 10.00 78.54 150 0.616 7.98 15.960 9.83
Bendrat 7.54
Luas BEGISTING 9.24 m2 Tot. Vol 761.61
Waste 0% 0.00
Grand Tot. Vol 761.61
Rasio besi/vol (kg/m3) 114.87
Rasio beton/luas (m3/m2) 0.72

LUAS BANGUNAN
LANTAI Panjang Lebar Bukaan Luas (a) Dari Autocad) satuan KELILING satuan

dalm
LT.DASAR bangunan 587 m2 122.5 M'

luar
LT.DASAR bangunan 163.36 m2 132 M'
LT.2 516.2 m2 108.7 M'
LT.3 516.2 m2 108.7 M'
LT.dak Atap 73.5 m2 100.6 M'

BALKON LT 2 13.5 m2 16.8 M'


BALKON LT 3 9.3 m2 13.8 M'

TOTAL LUAS 1879.06 M2 5,297.00 M2

PASANGAN BATU KALI


LANTAI Panjang Tinggi Tebal Volume
LT.DASAR ( arah X ) 0 0.6 0.25 0 m3
0 0.6 0.25 0 m3
( arah Y ) 0 0.6 0.25 0 m3
0 0.6 0.25 0 m3
TOTAL LUAS 0 m3
ANALISA VOLUME PEKERJAAN

PEKERJAAN : PERENCANAAN DESAIN BERULANG PEMBANGUNAN RUMAH SUSUN TA. 2020


TIPE PROTOTYPE : RUMAH SUSUN T-36
JUMLAH LANTAI : 4 LANTAI
TAHUN ANGGARAN : 2018 - 2019
LOKASI : …..............................

PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
#REF! #REF!
#REF! #REF!

#REF! #REF!
#REF! #REF!
1.00 0.15 2248.00 337.20 M3
2.00 0.15 6.00 1.80 M3
-1.00 0.15 1466.00 -219.90 M3
2.00 0.15 28.00 8.40 M3
-1.00 0.15 31.50 -4.73 M3
-1.00 0.15 14.19 -2.13 M3
-2.00 0.15 4.10 -1.23 M3
-2.00 0.15 1.80 -0.54 M3
120.65 M3
#REF! #REF!
804.31 M2
#REF! #REF!
44.00 44.00 Buah
#REF! #REF!
58.00 58.00 Buah
0.00 Buah
#REF! #REF!
#REF! #REF!
1.00 0.07 573.04 40.11 M3
#REF! #REF!
1.00 573.04 573.04 M2
#REF! #REF!
1.00 161.50 161.50 M'
#REF! #REF!
#REF! #REF!
4.00 17.40 0.58 40.23 M2
4.00 44.95 0.58 103.92 M2
2.00 0.00 0.58 0.00 M2
2.00 0.00 0.58 0.00 M2
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
144.15 M2
#REF! #REF!
4.00 17.40 0.31 21.58 M2
4.00 44.95 0.31 55.74 M2
2.00 0.00 0.31 0.00 M2
2.00 0.00 0.31 0.00 M2

4.00 17.40 0.15 0.00 M2


4.00 44.95 0.15 26.97 M2
2.00 0.00 0.15 0.00 M2
2.00 0.00 0.15 0.00 M2
104.28 M2
#REF! #REF!
4.00 17.40 0.31 21.58 M2
4.00 44.95 0.31 55.74 M2
2.00 0.00 0.31 0.00 M2
2.00 0.00 0.31 0.00 M2
0.00 M2
4.00 17.40 0.15 10.44 M2
4.00 44.95 0.15 26.97 M2
2.00 0.00 0.15 0.00 M2
2.00 0.00 0.15 0.00 M2

114.72 M2
#REF! #REF!
2.00 17.40 0.30 0.13 1.31 M3
1.00 44.95 0.30 0.13 1.69 M3
1.00 0.00 0.30 0.13 0.00 M3
1.00 0.00 0.30 0.13 0.00 M3

2.99 M3
#REF! #REF!
2.00 17.40 0.30 0.58 6.03 M3
1.00 44.95 0.30 0.58 7.79 M3
1.00 0.00 0.30 0.58 0.00 M3
1.00 0.00 0.30 0.58 0.00 M3

13.83 M3
#REF! #REF!
2.00 17.40 34.80 M'
2.00 44.95 89.90 M'
1.00 0.00 0.00 M'
2.00 0.00 0.00 M'
0.00 M'
124.70 M'
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
#REF! #REF!
1.00 50.00 50.00 M'
#REF! #REF!
2.00 2.30 4.60 M'
1.00 8.40 8.40 M'
2.00 1.70 3.40 M'
16.40 M'
#REF! #REF!

#REF! #REF!
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
10.24 M2
#REF! #REF!
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
8.00 1.10 0.15 1.32 M2
16.00 0.25 0.15 0.60 M2
12.16 M2
#REF! #REF!
4.00 0.80 0.80 0.05 0.13 M3
#REF! #REF!
4.00 1.10 1.10 0.80 3.87 M3

1.00 1.00 Unit


#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

3.B.3. PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN

#REF! #REF! ukuran luar bangunan t =balok 0.29 t= lantai 0.12


PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
#REF! #REF! 4.15 3.15 2.74 tebal diding 0.15 t = dak 0.12
HORIZONTAL 1.00 2.85 2.33 1.00 6.64 M2
1.00 2.85 2.33 1.00 6.64 M2
VETIKAL 1.00 4.00 2.33 1.00 9.32 M2
1.00 4.00 2.33 1.00 PINTU 3.63 1.00 3.63 5.69 M2
28.29 M2
#REF! #REF!
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 4.00 2.33 2.00 18.64 M2
1.00 4.00 2.33 2.00 PINTU 3.63 1.00 3.63 11.37 M2
56.58 M2
#REF! #REF!
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 4.00 2.33 2.00 18.64 M2
1.00 4.00 2.33 2.00 PINTU 3.63 1.00 3.63 11.37 M2

56.58 M2
#REF! #REF!
4.00 2.33 9.32 M'
1.00 2.15 1.69 3.84 M'
13.16 M'
#REF! #REF!
Atas 1.00 2.85 4.15 11.83 M2
Belakang 1.00 0.29 4.15 4.44 M2
Balok 3.00 0.17 4.15 12.96 M2
Muka 1.00 0.12 4.15 4.27 M2
33.50 M2
#REF! #REF!
LANTAI 1.00 10.97 10.97 M2
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 4.00 2.33 2.00 18.64 M2
1.00 3.85 2.33 2.00 PINTU 3.63 1.00 3.63 10.67 M2
66.85 M2
#REF! #REF!
Atas 1.00 4.00 6.15 24.60 M2
Belakang 1.00 0.29 6.15 6.44 M2
Balok 3.00 0.17 6.15 18.96 M2
Muka 1.00 0.12 6.15 6.27 M2
56.27 M2
#REF! #REF!
LANTAI 1.00 10.97 10.97 M2
TANGGA 2.00 2.81 5.61 M2
16.58 M2
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
#REF! #REF!
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 3.85 2.33 2.00 17.94 M2
1.00 3.85 2.33 2.00 PINTU 3.63 1.00 3.63 10.67 M2
55.18 M2
#REF! #REF!
DAK 1.00 3.15 6.15 19.37 M2
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 3.85 2.33 2.00 17.94 M2
1.00 3.85 2.33 2.00 PINTU 3.63 1.00 3.63 10.67 M2
74.55 M2
#REF! #REF!
1.00 1.00 Unit

#REF! #REF!
#REF! #REF!
#REF! #REF!
Lobby 1.00 1.00 Unit
#REF! #REF! Lantai Dasar
Unit Hunian 4.00 4.00 Unit
R. WUDHU 2.00 2.00 Unit
R. Pengelola 1.00 1.00 Unit
R, Mushola 0.00 Unit
Janitor danPantri 0.00 Unit
Toilet Umum Wanita 1.00 1.00 Unit
Toilet Umum Pria 1.00 1.00 Unit
9.00 Unit
Lantai 2
Unit Hunian 4.00 4.00 Unit
R. WUDHU 2.00 2.00 Unit
Toilet Umum Wanita 1.00 1.00 Unit
Toilet Umum Pria 1.00 1.00 Unit
R. WUDHU 2.00 2.00 Unit
Lantai 3
Ruang bersama 0 Unit Hunian 4.00 4.00 Unit
Toilet Umum Wanita 1.00 1.00 Unit
Toilet Umum Pria 1.00 1.00 Unit

Lantai 4 0.00 Unit


25.00 Unit
#REF! #REF! Lantai Dasar 2.00 2.00 Unit
Lantai 2 2.00 2.00 Unit
Lantai 3 2.00 2.00 Unit
Lantai 4 0.00 Unit
6.00 Unit
#REF! #REF! Lantai Dasar 1.00 1.00 Unit
Lantai 2 1.00 1.00 Unit
Lantai 3 1.00 1.00 Unit
Lantai 4 0.00 Unit
3.00 Unit
ANALISA VOLUME PEKERJAAN

PEKERJAAN : PERENCANAAN DESAIN BERULANG PEMBANGUNAN RUMAH SUSUN TA. 2020


TIPE PROTOTYPE : RUMAH SUSUN T-36
JUMLAH LANTAI : 4 LANTAI
TAHUN ANGGARAN : 2018 - 2019
LOKASI : …..............................

PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
I DRAINASE LUAR/SEKELILING BANGUNAN
1 Pek. Pasangan 1/2 Bata Saluran
4.00 28.17 0.58 65.13 M2
4.00 16.95 0.58 39.19 M2
2.00 64.74 0.58 74.84 M2
4.00 1.70 0.58 3.93 M2
2.00 8.40 0.58 9.71 M2
192.80 M2
2 Pek. Plesteran 1:3
4.00 28.17 0.31 34.93 M2
4.00 16.95 0.31 21.02 M2
2.00 64.74 0.31 40.14 M2
4.00 1.70 0.31 2.11 M2
2.00 8.40 0.31 5.21 M2
4.00 28.17 0.15 16.90 M2
4.00 16.95 0.15 10.17 M2
2.00 64.74 0.15 19.42 M2
4.00 1.70 0.15 1.02 M2
2.00 8.40 0.15 2.52 M2
153.44 M2
3 Pek. Acian
4.00 28.17 0.31 34.93 M2
4.00 16.95 0.31 21.02 M2
2.00 64.74 0.31 40.14 M2
4.00 1.70 0.31 2.11 M2
2.00 8.40 0.31 5.21 M2
4.00 28.17 0.15 16.90 M2
4.00 16.95 0.15 10.17 M2
2.00 64.74 0.15 19.42 M2
4.00 1.70 0.15 1.02 M2
2.00 8.40 0.15 2.52 M2
153.44 M2
4 Pek. Pasir Urug t = 10 cm
2.00 28.17 0.30 0.13 2.11 M3
2.00 16.95 0.30 0.13 1.27 M3
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
1.00 64.74 0.30 0.13 2.43 M3
2.00 1.70 0.30 0.13 0.13 M3
1.00 8.40 0.30 0.13 0.32 M3
6.25 M3
5 Pek. Galian Tanah Saluran
2.00 28.17 0.30 0.58 9.77 M3
2.00 16.95 0.30 0.58 5.88 M3
1.00 64.74 0.30 0.58 11.23 M3
2.00 1.70 0.30 0.58 0.59 M3
1.00 8.40 0.30 0.58 1.46 M3
28.92 M3
6 Pek. Buis Beton Setengah Lingkaran 30 cm
2.00 28.17 56.34 M'
2.00 16.95 33.90 M'
1.00 64.74 64.74 M'
2.00 1.70 3.40 M'
1.00 8.40 8.40 M'
166.78 M'
7 Pek. Gorong-Gorong dia. 60 cm Menuju Ke Riol Kota
1.00 50.00 50.00 M'
8 Pek. Grill penutup saluran, besi siku 50.50.5 + plat strip
2.00 2.30 4.60 M'
1.00 8.40 8.40 M'
2.00 1.70 3.40 M'
16.40 M'
II BAK KONTROL
BAK KONTROL BK
1 Pek. Pasangan 1/2 Bata Bak Kontrol ( 4 unit BK )
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
10.24 M2
2 Pek. Plester + Aci
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
8.00 1.10 0.15 1.32 M2
16.00 0.25 0.15 0.60 M2
12.16 M2
3 Pek. Pasir Urug t = 5 cm
4.00 0.80 0.80 0.05 0.13 M3
4 Pek. Galian Tanah
4.00 1.10 1.10 0.80 3.87 M3
B.3. PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN
A GWT
1 Pek. Pasang Rollag Bata Teras
2.00 8.90 0.15 1.00 2.67 M2
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
1.00 7.80 0.15 1.00 1.17 M2
3.84 M2
2 Pek. Pasangan Dinding Bata 1:5
2.00 8.90 0.80 1.00 14.24 M2
1.00 7.80 0.80 1.00 6.24 M2
20.48 M2
3 Pek. Plester Dinding Exterior/Dind. Terluar
2.00 8.90 0.60 2.00 21.36 M2
1.00 7.80 0.60 2.00 9.36 M2
2.00 8.90 0.15 1.00 2.67 M2
1.00 7.80 0.15 1.00 1.17 M2
34.56 M2
4 Pek. Acian Dinding Exterior/Dind. Terluar
2.00 8.90 0.60 2.00 21.36 M2
1.00 7.80 0.60 2.00 9.36 M2
2.00 8.90 0.15 1.00 2.67 M2
1.00 7.80 0.15 1.00 1.17 M2
34.56 M2
5 Pek. Kolom Praktis & Balok Praktis 11/11
4.00 0.80 3.20 M'
6 Pek. Perapihan Dinding Beton Exterior
HORIZONTAL 2.00 8.00 1.74 1.00 27.84 M2
VERTIKAL 4.00 3.00 1.74 1.00 20.88 M2
48.72 M2
7 Pek. Perapihan Daerah Dak Beton
DAK 1.00 53.54 53.54 M2
8 Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan Dinding
LANTAI 2.00 21.42 42.83 M2
1.00 4.50 4.50 M2
HORIZONTAL 2.00 8.00 2.50 1.00 40.00 M2
2.00 1.95 2.50 1.00 9.75 M2
2.00 6.05 2.50 1.00 30.25 M2
2.00 1.80 2.50 1.00 9.00 M2
VERTIKAL 2.00 3.00 2.50 1.00 15.00 M2
2.00 1.33 2.50 1.00 6.63 M2
2.00 1.68 2.50 1.00 8.38 M2
2.00 2.50 2.50 1.00 12.50 M2
178.83 M2
9 Pek. Waterproofing (liquid/cement base) di Daerah Dak
DAK 1.00 53.54 53.54 M2
10 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar)
LANTAI 2.00 21.42 42.83 M2
1.00 4.50 4.50 M2
47.33 M2
11 Pek. Pasang Keramik Dinding 20x20
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
HORIZONTAL 2.00 8.00 2.50 1.00 40.00 M2
2.00 6.05 2.50 1.00 30.25 M2
2.00 1.95 2.50 1.00 9.75 M2
2.00 1.80 2.50 1.00 9.00 M2
VERTIKAL 2.00 3.00 2.50 1.00 15.00 M2
2.00 1.33 2.50 1.00 6.63 M2
2.00 1.68 2.50 1.00 8.38 M2
2.00 2.50 2.50 1.00 12.50 M2
131.50 M2
12 Pek. Cat Dinding dan Dak Bag. Luar (exterior)
TERAS 2.00 8.90 0.60 2.00 21.36 M2
TERAS 1.00 7.80 0.60 2.00 9.36 M2
TERAS 2.00 8.90 0.15 1.00 2.67 M2
TERAS 1.00 7.80 0.15 1.00 1.17 M2
HORIZONTAL GWT 2.00 8.00 1.74 1.00 27.84 M2
VERTIKAL GWT 2.00 3.00 1.74 1.00 10.44 M2
DAK GWT 1.00 53.54 53.54 M2
126.38 M2
13 Pek. Tangga Dalam 'M' GWT + Cat (model gantung lengkap terpasang)
Tangga Monyet 3.00 3.00 Unit
14 Pek. Tangga Luar 'M' GWT + Cat (model gantung lengkap terpasang)
Tangga Monyet 1.00 1.00 Unit
15 Pek. Penutup Mainhole Baja + Cat (terpasang)
Main Hole 3.00 3.00 Unit
B RUANG POMPA
1 Pek. Galian Tanah
HORIZONTAL PONDASI 2.00 4.15 0.93 0.93 7.23 M3
VERTIKAL PONDASI 2.00 4.30 0.93 0.93 7.49 M3
BADAN R POMPA 1.00 4.15 4.30 1.28 22.84 m3
37.55 M3
2 Pek. Pasir Urug t = 5 cm
HORIZONTAL 2.00 4.15 0.93 0.13 1.03 M3
VERTIKAL 2.00 4.30 0.93 0.13 1.07 M3
2.10 M3
3 Pek. Pondasi Batu Belah, Campuran 1 PC : 4 PP
HORIZONTAL 2.00 4.15 0.67 0.80 4.43 M3
VERTIKAL 2.00 4.30 0.67 0.80 4.59 M3
4 Pek. Urugan Tanah Kembali 9.01 M3
BADAN R POMPA 1.00 4.15 4.30 1.28 22.84 m3
3.60 M3

3 Pek. Sloof
Besi U-39 1.00 16.90 8.98 151.73 kg
Bekisting 1.00 16.90 0.26 0.40 13.52 m2
Beton K-300 1.00 16.90 0.26 0.40 1.76 m3
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
4 Pek. Kolom
Besi U-39 4.00 13.19 52.77 kg
Bekisting 4.00 0.15 0.15 2.50 6.00 m2
Beton K-300 4.00 0.15 0.15 2.50 0.22 m3
5 Pek. Ringbalk
Besi U-39 1.00 16.90 6.88 116.30 kg
Bekisting 1.00 16.90 0.15 0.17 5.75 m2
Beton K-300 1.00 16.90 0.15 0.17 0.43 m3
6 Pek. Dak Atap
Besi U-24 1.00 523.89 523.89 kg
Bekisting 1.00 4.30 6.16 0.12 26.49 m2
Beton K-300 1.00 4.30 6.16 0.12 3.18 m3
7 Pek. Lantai Beton
Besi U-24 (1 lapis) 1.00 221.09 221.09 kg
Beton K-300 1.00 4.15 4.30 0.12 2.14 m3

8 Pek. Pasangan Dinding Bata 1:5


HORIZONTAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 10.00 M2
VETIKAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 PINTU 2.31 1.00 2.31 7.69 M2
37.69 M2
9 Pek. Plester Dinding Exterior/Dind. Terluar
HORIZONTAL 1.00 4.00 2.50 2.00 20.00 M2
1.00 4.00 2.50 2.00 20.00 M2
VETIKAL 1.00 4.00 2.50 2.00 20.00 M2
1.00 4.00 2.50 2.00 PINTU 2.31 1.00 2.31 15.38 M2
75.38 M2
10 Pek. Acian Dinding Exterior/Dind. Terluar
HORIZONTAL 1.00 4.00 2.50 2.00 20.00 M2
1.00 4.00 2.50 2.00 20.00 M2
VETIKAL 1.00 4.00 2.50 2.00 20.00 M2
1.00 4.00 2.50 2.00 PINTU 2.31 1.00 2.31 15.38 M2
75.38 M2
11 Pek. Kolom Praktis & Balok Praktis 11/11 Termasuk Opening Kusen Aluminium
4.00 2.50 10.00 M'
1.00 2.10 1.10 3.20 M'
13.20 M'
12 Pek. Perapihan Daerah Dak Beton
1.00 4.30 6.16 26.49 M2
13 Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan Dinding
LANTAI 1.00 16.00 16.00 M2
HORIZONTAL 1.00 4.00 2.50 2.00 20.00 M2
1.00 4.00 2.50 2.00 20.00 M2
VETIKAL 1.00 4.00 2.50 2.00 20.00 M2
PENGURANG

A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN

AK
PEKERJAAN

NY
(m2) (m) (m2)

BA
1.00 4.00 2.50 2.00 PINTU 2.31 1.00 2.31 15.38 M2
91.38 M2
14 Pek. Waterproofing (liquid/cement base) di Daerah Dak
DAK 1.00 4.30 6.16 26.49 M2
15 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar)
LANTAI 1.00 16.00 16.00 M2
TANGGA 2.00 1.65 3.30 M2
19.30 M2
16 Pek. Pasang Keramik Dinding 20x20
HORIZONTAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 10.00 M2
VETIKAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 PINTU 2.31 1.00 2.31 7.69 M2
37.69 M2
17 Pek. Cat Dinding dan Dak Bag. Luar (exterior)
DAK 1.00 4.30 6.16 26.49 M2
HORIZONTAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 10.00 M2
VETIKAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 PINTU 2.31 1.00 2.31 7.69 M2
64.18 M2
18 Pek. Pintu Besi
1.00 1.00 Unit
REKAPITULASI
BILL OF QUANTITY ( BOQ )

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PONDOK PESANTREN AL QURAN


TIPOLOGI : BARAK SUPER MINI 2 LANTAI
LOKASI : KABUPATEN REMBANG
TAHUN ANGARAN : 2022

I. PEKERJAAN PERSIAPAN STANDAR DAN PEKERJAAN RK3K KONSTRUKSI


No. URAIAN PEKERJAAN JUMLAH HARGA (Rp.)

I.A. PEKERJAAN PERSIAPAN 53,694,774.63

I.B. PEKERJAAN RK3K KONSTRUKSI 24,325,000.00

JUMLAH HARGA PEKERJAAN PERSIAPAN DAN RK3K KONSTRUKSI 78,019,774.63

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
R E K A P I T U L A S I
BILL OF QUANTITY ( BOQ )

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PONDOK PESANTREN AL QURAN


TIPOLOGI : BARAK SUPER MINI 2 LANTAI
LOKASI : KABUPATEN REMBANG
TAHUN ANGARAN : 2022

III. PEKERJAAN STRUKTUR


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)
PEKERJAAN STRUKTUR
III PEKERJAAN STRUKTUR NON STANDART 397,750,429.19
A PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE) Rp 309,164,784.37
B PEKERJAAN STRUKTUR RUANG POMPA Rp 34,665,904.52
C PEKERJAAN STRUKTUR STP Rp 37,653,826.84
D PEKERJAAN STRUKTUR RESAPAN Rp 16,265,913.47

IV PEKERJAAN STRUKTUR STANDAR 783,658,762.99


A PEKERJAAN LANTAI 1 Rp 240,081,361.17
B PEKERJAAN LANTAI 2 Rp 272,829,948.18
C PEKERJAAN LANTAI DAK Rp 113,874,928.03
D RING BALK Rp 73,715,384.81
E SOPI-SOPI Rp 13,694,980.93
F RANGKA ATAP BAJA Rp 69,462,159.87

SUB TOTAL : 1,181,409,192.18

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
R E K A P I T U L A S I
BILL OF QUANTITY ( BOQ )

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PONDOK PESANTREN AL QURAN


TIPOLOGI : BARAK SUPER MINI 2 LANTAI
LOKASI : KABUPATEN REMBANG
TAHUN ANGARAN : 2022

3. PEKERJAAN ARSITEKTUR

JUMLAH HARGA
NO. U R A I A N P E K E R J A A N
(Rp.)

V PEKERJAAN ARSITEKTUR STANDAR 880,139,959.13

A PEKERJAAN LANTAI SATU 394,910,627.03

A.1. PEKERJAAN PASANGAN DINDING & BETON PRAKTIS Rp 188,929,490.95


A.2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING Rp 97,311,837.02
A.3. PEKERJAAN PLAFOND Rp 29,302,904.02
A.4. PEKERJAAN LANTAI Rp 39,074,829.83
A.5. PEKERJAAN UTILITAS Rp 9,400,710.00
A.6. PEKERJAAN PENGECATAN Rp 18,304,761.82
A.7. PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS DI FACADE DAN SELASAR KELILING BANGUNAN Rp 12,586,093.39

B PEKERJAAN LANTAI DUA 338,492,748.21

B.1. PEKERJAAN PASANGAN DINDING & BETON PRAKTIS Rp 135,221,369.25


B.2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING Rp 98,666,118.00
B.3. PEKERJAAN PLAFOND Rp 29,302,904.02
B.4. PEKERJAAN LANTAI Rp 50,234,879.34
B.5. PEKERJAAN UTILITAS Rp 8,177,444.00
B.6. PEKERJAAN PENGECATAN Rp 16,890,033.61

C PEKERJAAN LANTAI TIGA 146,736,583.88

C.1. PEKERJAAN PASANGAN DINDING & BETON PRAKTIS Rp 34,166,291.65


C.2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING Rp 20,931,538.61
C.3. PEKERJAAN PLAFOND Rp 9,243,539.83
C.4. PEKERJAAN LANTAI Rp 9,293,214.00
C.5. PEKERJAAN UTILITAS Rp 4,058,445.84
C.6. PEKERJAAN PENGECATAN Rp 5,826,299.39
C.7. PEKERJAAN PENUTUP ATAP Rp 63,217,254.57

VI PEKERJAAN ARSITEKTUR NON STANDART 259,741,640.78

A PEKERJAAN KELILING BANGUNAN DAN TANAMAN Rp 25,454,600.00


B PEKERJAAN PERKERASAN AKSES JALAN MASUK Rp 49,522,640.00
C PEKERJAAN PAGAR KELILING Rp 112,318,465.14
D PEKERJAAN KURSI TAMAN (6SET) Rp 23,020,581.06
E DRAINASE LUAR/SEKELILING BANGUNAN Rp 21,630,244.70
F BAK KONTROL Rp 1,097,127.18
G PEKERJAAN GROUND TANK, RUANG POMPA DAN AKSESORIS Rp 6,826,194.84
H AKSESORIS Rp 19,871,787.87

JUMLAH HARGA PEKERJAAN ARSITEKTUR 1,139,881,599.91

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
REKAPITULASI
BILL OF QUANTITY ( BOQ )
PEKERJAAN MEKANIKAL & ELEKTRIKAL

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PONDOK PESANTREN AL QURAN


TIPOLOGI : BARAK SUPER MINI 2 LANTAI
LOKASI : KABUPATEN REMBANG
TAHUN ANGARAN : 2022

IV. PEKERJAAN MEKANIKAL DAN ELEKTRIKAL


JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rp.)

VII PEKERJAAN MEKANIKAL & ELEKTRIKAL STANDART 113,090,636.68

A PEKERJAAN LANTAI 1 37,491,591.16


1. PEMIPAAN AIR BERSIH Rp 2,660,284.57
2. PEMIPAAN AIR KOTOR & AIR BEKAS Rp 6,556,867.06
3. PEMIPAAN AIR HUJAN Rp 6,558,160.95
4. PEMIPAAN VENT Rp 970,600.13
5. INSTALASI PANEL Rp 5,440,272.00
6. INSTALASI KABEL FEEDER Rp 210,577.74
7. INSTALASI KABEL TRAY Rp 3,115,252.00
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK Rp 4,914,678.94
9. INSTALASI PENERANGAN & STOP KONTAK Rp 7,064,897.78

B PEKERJAAN LANTAI 2 31,265,761.59


1. PEMIPAAN AIR BERSIH Rp 2,335,952.47
2. PEMIPAAN AIR KOTOR & AIR BEKAS Rp 3,659,320.16
3. PEMIPAAN AIR HUJAN Rp 3,754,710.34
4. PEMIPAAN VENT Rp 559,522.43
5. INSTALASI PANEL Rp 5,440,272.00
6. INSTALASI KABEL FEEDER Rp 421,155.49
7. INSTALASI KABEL TRAY Rp 3,115,252.00
8. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK Rp 4,914,678.94
9. INSTALASI PENERANGAN & STOP KONTAK Rp 7,064,897.78

D PEKERJAAN LANTAI ATAP 6,721,128.62


1. PEMIPAAN AIR BERSIH Rp 3,247,626.25
2. PEMIPAAN AIR HUJAN Rp 2,738,919.38
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK Rp 195,877.88
4. INSTALASI PENERANGAN & STOP KONTAK Rp 538,705.12

E PEKERJAAN UTILITAS 24,783,976.49


1. INSTALASI PANEL Rp 19,188,938.63
2. INSTALASI KABEL FEEDER Rp 4,539,547.31
3. INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK Rp 362,996.23
4. INSTALASI PENERANGAN & STOP KONTAK Rp 692,494.32

F PEKERJAAN SISTEM PENTANAHAN Rp 5,582,530.88 5,582,530.88


G PEKERJAAN PENANGKAL PETIR (FARADAY) Rp 7,245,647.93 7,245,647.93

VII PEKERJAAN MEKANIKAL & ELEKTRIKAL NON STANDART 116,829,743.91

A PEKERJAAN PEMADAM KEBAKARAN Rp 1,224,301.92


B PEKERJAAN VENTILASI UDARA Rp 13,489,356.14
C PEKERJAAN INSTALASI PLUMBING Rp 71,545,456.40
D PENYAMBUNGAN DAYA PLN Rp 22,440,000.00
E PEKERJAAN INSTALASI KABEL FEEDER Rp 8,130,629.44

SUB TOTAL : 229,920,380.59

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
LAPORAN MINGGUAN PRESTASI PEKERJAAN

PEKERJAAN : PEMBANGUNAN RUMAH SUSUN PONDOK PESANTREN AL QURAN


TIPOLOGI : BARAK SUPER MINI 2 LANTAI
LOKASI : KABUPATEN REMBANG
TAHUN ANGARAN : 2022
MINGGU KE- : 03 (22 AGUSTUS 2022 - 28 AGUSTUS 2022)

VOLUME REALISASI PROGR


NO. URAIAN PEKERJAAN
s/d Minggu lalu
KONTRAK Sat. JUMLAH HARGA (Rp) BOBOT (%)
Volume Bobot (%)
I. PEKERJAAN PERSIAPAN DAN PEKERJAAN RK3K KONSTRUKSI
1.A. PEKERJAAN PERSIAPAN 53,694,774.63 2.04 1.216
1 Pengukuran dan Pemasangan Bouwplank 65.00 M 2,788,500.00 0.106 20.00 0.033
2 Direksi Keet, lengkap dengan toilet, ruang rapat dan Mushola 17.00 M2 16,427,100.00 0.625 10.00 0.368
3 Papan Nama Proyek 1.00 ls 774,345.00 0.029 -
4 Foto Proyek 3 Fase (warna) 1.00 Phase 300,000.00 0.011 -
5 Air Kerja 1.00 Ls 5,000,000.00 0.190 -
6 Listrik Kerja 1.00 Ls 5,161,788.38 0.196 -
7 Pagar Seng Keliling Proyek, tinggi 1,8m 65.00 M 23,243,041.25 0.884 60.00 0.816
I.B. PEKERJAAN RK3K KONSTRUKSI 24,325,000.00 0.93 0.057
1 Penyiapan RK3K terdiri atas Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja dan 1.00 Ls 500,000.00 0.019 -
Pembuatan Kartu Identitas Pekerja (KIP)
2 Sosialisasi dan Promosi K3 terdiri atas
a Induksi K3 (Safety Induction) khusus untuk pekerja baru 30.00 Org 225,000.00 0.009 -
b Pengarahan K3 (safety briefing) Pertemuan Keselamatan (Safety Talk dan/atau Tool Box Meeting) 30.00 Org 225,000.00 0.009 -
d setiap hari
Simulasi K3 8.00 Org 200,000.00 0.008 -
e Spanduk (banner) 5.00 Lb 1,500,000.00 0.057 5.00 0.057
f Poster 3.00 Lb 450,000.00 0.017 -
g Papan Informasi K3. 1.00 Bh 500,000.00 0.019 -

3 Alat Pelindung Kerja terdiri atas


a Tali Keselamatan (Life Line) 1.00 Ls 500,000.00 0.019 -
b Penahan Jatuh (Safety Deck) 1.00 Ls 500,000.00 0.019 -
c Pagar Pengaman (Guard Railling) 1.00 Ls 500,000.00 0.019 -
d Pembatas Area (Restricted Area ). 1.00 Ls 500,000.00 0.019 -

4 Alat Pelindung Diri terdiri atas


a Topi Pelindung (Safety Helmet) 30.00 Bh 1,500,000.00 0.057 -
b Pelindung Mata (Goggles, Spectacles) 9.00 Psg 900,000.00 0.034 -
c Tameng Muka (Face Shield) 6.00 Bh 1,200,000.00 0.046 -
d Pelindung Telinga (Ear Plug, Ear Muff) 9.00 Psg 450,000.00 0.017 -
e Pelindung Pernafasan Dan Mulut (Masker) 30.00 Bh 60,000.00 0.002 -
f Sarung Tangan (Safety Gloves) 9.00 Psg 45,000.00 0.002 -
g Sepatu Keselamatan (Safety Shoes) untuk Staf 9.00 Psg 2,250,000.00 0.086 -
h Sepatu Keselamatan (Rubber Safety Shoes and toe cap) 30.00 Psg 4,500,000.00 0.171 -
i Penunjang Seluruh Tubuh (Full Body Harness) 3.00 Bh 600,000.00 0.023 -
j Rompi Keselamatan (Safety Vest) 30.00 Bh 1,500,000.00 0.057 -
k Pelindung Jatuh (Fall Arrester) 3.00 Bh 1,500,000.00 0.057 -

5 P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 500,000.00 0.019 -
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll) 1.00 Ls 500,000.00 0.019 -

6 Rambu-Rambu terdiri atas 1.00 ls 500,000.00 0.019 -


a Rambu Petunjuk
b Rambu Larangan
c Rambu Peringatan
d Rambu Kewajiban
e Rambu Informasi
f Rambu Pekerjaan Sementara
g Tongkat Pengatur Lalu Lintas (Warning Lights Stick)
h Kerucut Lalu Lintas (Traffic Cone)
i Lampu Putar (Rotary Lamp )
j Lampu Selang Lalu Lintas.

7 Lain- Lain Terkait Pengendalian Risiko K3


a Alat Pemadam Api Ringan (APAR) 10 kg 2.00 Bh 1,000,000.00 0.038 -
b Sirine 1.00 Bh 100,000.00 0.004 -
c Bendera K3 1.00 Bh 50,000.00 0.002 -
d Jalur Evakuasi (Escape Route ) 1.00 Ls 500,000.00 0.019 -
e Lampu Darurat (Emergency Lamp ) 1.00 Bh 70,000.00 0.003 -
f Program Inspeksi Dan Audit Internal 1.00 Org 500,000.00 0.019 -
g Pelaporan dan Penyelidikan Insiden. 1.00 Ls 500,000.00 0.019 -
II. PEKERJAAN STRUKTUR, ARSITEKTUR DAN ME
II.B. (1) PEKERJAAN STRUKTUR NON STANDAR 397,750,429.19 15.13
A PEKERJAAN STRUKTUR BAWAH (SUB STRUCTURE) 309,164,784.37 11.76 -
1 Pekerjaan mobilisasi dan demobilisasi 1.00 ls 5,000,000.00 0.190 -
2 Pekerjaan Pondasi Tiang Pancang 25x25 cm 468.00 m 93,132,000.00 3.542 -
3 Pemotongan kepala tiang 4.88 m3 488,000.00 0.019 -
Kedalaman Pondasi disesuaikan hasil sondir dan boring stempat

4 Pondasi Tipe PC1


Beton K-300 6.75 m3 6,811,695.00 0.259 -
Besi beton 983.73 kg 12,930,156.96 0.492 -
Bekisting 27.00 m2 3,047,121.00 0.116 -

5 Pondasi Tipe PC2


Beton K-300 2.25 m3 2,270,565.00 0.086 -
Besi beton 272.00 kg 3,575,170.72 0.136 -
Bekisting 9.00 m2 1,015,707.00 0.039 -

6 Pondasi Tipe PC3


Beton K-300 11.25 m3 11,352,825.00 0.432 -
Besi beton 1,068.69 kg 14,046,872.05 0.534 -
Bekisting 30.00 m2 3,385,690.00 0.129 -

7 Tie Beam / Sloof TB1


Beton K-300 7.73 m3 7,800,652.20 0.297 -
Besi beton 327.34 kg 4,302,560.23 0.164 -
Bekisting 62.06 m2 7,003,864.05 0.266 -

8 Tie Beam / Sloof TB2


Beton K-300 0.07 m3 70,639.80 0.003 -
Besi beton 4.84 kg 63,617.01 0.002 -
Bekisting 0.78 m2 88,027.94 0.003 -

8 Pekerjaan Rollag Bata, Pas, 1bt (dibawah dinding bata) 64.55 m2 14,215,556.02 0.541 -
9 Pekerjaan Rollag Bata (disisi luar) 58.00 m2 12,773,079.00 0.486 -
10 Besi Dowel 10-1000 79.49 kg 1,044,817.35 0.040 -

11 Pekerjaan Galian tanah


Pondasi Tipe PC1 13.26 m3 755,496.46 0.029 -
Pondasi Tipe PC2 4.42 m3 251,832.15 0.010 -
Pile Cap Tipe PC-3 19.49 m3 1,110,454.44 0.042 -
Tie Beam / Sloof TB1 12.88 m3 733,845.73 0.028 -
Tie Beam / Sloof TB2 0.13 m3 7,406.83 0.000 -

12 Pekerjaan Urugan Pasir tebal 10 cm


Pondasi Tipe PC1 1.35 m3 325,571.40 0.012 -
Pondasi Tipe PC2 0.45 m3 108,523.80 0.004 -
Pile Cap Tipe PC-3 2.25 m3 542,619.00 0.021 -
Tie Beam / Sloof TB1 1.72 m3 414,802.08 0.016 -
Tie Beam / Sloof TB2 0.02 m3 4,823.28 0.000 -

13 Pekerjaan Lantai Kerja tebal 5 cm


Tie Beam / Sloof TB1 0.68 m3 503,303.02 0.019 -
Tie Beam / Sloof TB2 0.23 m3 170,234.85 0.006 -
Pile Cap Tipe PC-3 1.13 m3 836,371.20 0.032 -
Pondasi Tipe PC1 0.86 m3 636,530.29 0.024 -
Tie Beam / Sloof TB2 0.01 m3 7,401.52 0.000 -

14 Urugan tanah kembali bekas galian 41.50 m3 1,385,934.00 0.053 -


15 Urugan tanah mendatangkan untuk Halaman Rusun 312.00 m3 63,231,168.00 2.405 -
15 Pemadatan tanah CBR 6%, 353.50 m3 23,719,850.00 0.902 -
16 Pekerjaan Test PDA Tiang 1.00 Titik 10,000,000.00 0.380 -

B PEKERJAAN STRUKTUR RUANG POMPA 34,665,904.52 1.32 -


1 Pekerjaan Galian tanah 8.16 m3 464,920.90 0.018 -
2 Pasir urug diatas tanah urug t=5 cm 1.41 m3 340,041.24 0.013 -
3 Cor beton lantai kerja Fc 8,3 Mpa t=5 cm 1.80 m3 1,332,272.70 0.051 -
4 Pek. Pondasi Batu Belah, Campuran 1 PC 4 PP 3.40 m3 2,629,126.50 0.100 -
5 Pek. Pondasi Batu Kosong (Anstamping) 1.53 m3 665,609.67 0.025 -

6 Sloof s1
Beton K-300 0.51 m3 514,661.40 0.020 -
Besi beton 61.20 kg 804,413.41 0.031 -
Bekisting 6.80 m2 767,423.07 0.029 -

7 Pekerjaan Lantai Dasar R.Pompa


Beton K-300 1.80 m3 1,816,452.00 0.069 -
Wiremesh M6 55.26 kg 718,932.60 0.027 -

8 Kolom K1
Beton K-300 0.27 m3 272,467.80 0.010 -
Besi beton 32.40 kg 425,865.92 0.016 -
Bekisting 3.60 m2 316,991.40 0.012 -

9 Ring Balok (B1)


Beton K-300 0.38 m3 383,473.20 0.015 -
Besi beton 45.90 kg 603,310.06 0.023 -
Bekisting 5.10 m2 764,493.40 0.029 -

10 Pekerjaan Dinding Rooster 20X20 24.00 m2 6,928,020.00 0.263 -


11 Pekerjaan Rangka Atap Baja Ringan 0,75mm 39.00 m2 6,149,286.00 0.234 -
12 Pekerjaan Atap Spandek 39.00 m2 6,067,990.50 0.231 -
13 Pekerjaan Penutup Dinding Depan Spandek 4.50 m2 700,152.75 0.027 -
14 Pekerjaan Krangkeng Pompa, lengkap dengan pintu dan gembok 1.00 unit 2,000,000.00 0.076 -

C PEKERJAAN STRUKTUR STP 37,653,826.84 1.43 -


1 Pekerjaan Galian tanah 40.00 m3 2,279,024.00 0.087 -
2 Pekerjaan Urugan tanah kembali bekas galian 18.50 m3 617,826.00 0.023 -
3 Pasir urug diatas tanah urug 0.80 m3 192,931.20 0.007 -
4 Cor beton lantai kerja Fc 8.3 Mpa t=5 cm 0.80 m3 592,121.20 0.023 -

5 Pekerjaan Lantai Dasar Pondasi STP tebal 20 cm


Beton K-300 3.36 m3 3,390,710.40 0.129 -
Wiremesh M8 97.02 kg 1,262,230.20 0.048 -
Bekisting 4.96 m2 410,600.37 0.016 -

6 Pekerjaan Dinding Bagian Luar Beton STP tebal 15cm


Beton K-300 6.00 m3 6,054,840.00 0.230 -
Besi beton 870.00 kg 11,318,700.00 0.430 -
Bekisting 80.00 m2 7,070,653.33 0.269 -

7 Pelat Atas (STP)


Beton K-300 1.92 m3 1,937,548.80 0.074 -
Wiremesh M8 92.40 kg 1,202,124.00 0.046 -
Bekisting 16.00 m2 1,324,517.33 0.050 -

D PEKERJAAN STRUKTUR RESAPAN 16,265,913.47 0.62 -


1 Pekerjaan Galian tanah 25.00 M3 1,424,390.00 0.054 -
2 Pasangan Bata Merah 32.00 M3 3,431,084.80 0.130 -

3 Pekerjaan Kolom 15 cm x 15 cm
Beton K-300 0.36 M3 363,290.40 0.014 -
Besi beton 43.20 Kg 562,032.00 0.021 -
Bekisting 4.80 M2 422,655.20 0.016 -

4 Pasangan Batu Kosong 4.00 M3 1,740,156.00 0.066 -


5 Urugan Pasir 1.60 M3 382,272.00 0.015 -
6 Ijuk 2.40 M3 1,920,000.00 0.073 -

7 Pelat Atas (STP)


Beton K-300 0.96 M3 968,774.40 0.037 -
Wiremesh M8 46.20 M2 4,389,000.00 0.167 -
Bekisting 8.00 M2 662,258.67 0.025 -
II.A. (1) PEKERJAAN STRUKTUR STANDAR 783,658,762.99 29.81
A PEKERJAAN LANTAI 1 240,081,361.17 9.13 -
1 Kolom K1 (30 cm x 50 cm)
Beton K-300 7.38 m3 7,447,453.20 0.283 -
Besi beton 2,443.66 kg 31,792,016.60 1.209 -
Bekisting 78.72 m2 6,931,545.28 0.264 -

2 Kolom K2 ( 30 cm x 30 cm)
Beton K-300 5.17 m3 5,217,253.80 0.198 -
Besi beton 1,443.26 kg 18,776,812.60 0.714 -
Bekisting 68.88 m2 6,065,102.12 0.231 -

3 Kolom K3 (20 cm x 30 cm)


Beton K-300 0.49 m3 494,478.60 0.019 -
Besi beton 160.75 kg 2,091,357.50 0.080 -
Bekisting 8.20 m2 722,035.97 0.027 -

4 Perkerjaan dalam bangunan


Tanah urug peninggian lantai t=45 cm (dalam bangunan) + pemadatan CBR 5% 89.10 m3 18,057,362.40 0.687 -
Pasir urug diatas tanah urug t=10 cm (dalam bangunan) 19.20 m3 4,630,348.80 0.176 -
Cor beton lantai kerja t=5 cm (dalam bangunan) 9.60 m3 7,105,454.40 0.270 -

5 Perkerjaan luar bangunan


Tanah urug peninggian lantai t=45 cm (dalam bangunan) + pemadatan CBR 5% 11.60 m3 2,350,902.40 0.089 -
Pasir urug diatas tanah urug t=10 cm (luar bangunan) 5.80 m3 1,398,751.20 0.053 -
Cor beton lantai kerja t=5 cm (luar bangunan) 2.90 m3 2,146,439.35 0.082 -

6 Cor beton Lantai Dasar Fc 25 Mpa t=10 cm (dalam bangunan)


Beton K-300 25.58 m3 25,813,801.20 0.982 -
Besi Weremesh M-8 196.80 m2 18,696,000.00 0.711 -

7 Cor beton Lantai Dasar Fc 25 Mpa t=10 cm (ramp difable)


Beton K-300 2.45 m3 2,472,393.00 0.094 -
Besi beton 206.97 kg 2,692,679.70 0.102 -
Besi Weremesh M-8 15.43 m2 1,465,850.00 0.056 -

8 Balok Semu (BS-1) Lantai Dasar


Beton K-300 3.53 m3 3,562,264.20 0.135 -
Besi Beton 170.13 kg 2,213,391.30 0.084 -

9 Pelat Beton Canopy Jendela t= 10 cm


Beton K-300 9.12 m3 9,203,356.80 0.350 -
Besi beton 3,131.37 kg 40,739,123.70 1.549 -
Bekisting 91.16 m2 7,546,437.51 0.287 -

10 Pelat Tangga Utama lt. 1


Beton K-300 0.72 m3 726,580.80 0.028 -
Besi beton 160.89 kg 2,093,178.90 0.080 -
Bekisting 11.66 m2 965,242.01 0.037 -

11 Anak Tangga Utama lt. 1


Beton K-300 0.77 m3 777,037.80 0.030 -
Besi beton 47.75 kg 621,227.50 0.024 -
Bekisting 6.17 m2 510,767.00 0.019 -

12 Bordes Tangga Utama lt. 1


Beton K-300 0.69 m3 696,306.60 0.026 -
Besi beton 157.16 kg 2,044,651.60 0.078 -
Bekisting 4.58 m2 379,143.09 0.014 -

13 Balok Bordes 20x35 cm Tangga Utama


Beton K-300 0.12 m3 121,096.80 0.005 -
Besi beton 108.50 kg 1,411,585.00 0.054 -
Bekisting 0.68 m2 101,932.45 0.004 -

B PEKERJAAN LANTAI 2 272,829,948.18 10.38 -


1 Kolom K1
Beton K-300 6.12 M3 6,175,936.80 0.235 -
Besi beton 2,070.75 Kg 26,940,457.50 1.025 -
Bekisting 65.28 M2 5,748,110.72 0.219 -

2 Kolom K2
Beton K-300 4.28 M3 4,319,119.20 0.164 -
Besi beton 1,224.51 Kg 15,930,875.10 0.606 -
Bekisting 57.12 M2 5,029,596.88 0.191 -

3 Kolom K3
Beton K-300 0.41 M3 413,747.40 0.016 -
Besi beton 136.36 Kg 1,774,043.60 0.067 -
Bekisting 6.80 M2 598,761.53 0.023 -

4 Balok B1.1
Beton K-300 10.33 M3 10,424,416.20 0.396 -
Besi beton 2,897.75 Kg 37,699,727.50 1.434 -
Bekisting 148.46 M2 22,254,252.97 0.846 -
5 Balok B.A.1
Beton K-300 1.60 M3 1,614,624.00 0.061 -
Besi beton 475.21 Kg 6,182,482.10 0.235 -
Bekisting 29.60 M2 4,437,059.73 0.169 -

6 Balok B.3
Beton K-300 0.08 M3 80,731.20 0.003 -
Besi beton 31.06 Kg 404,090.60 0.015 -
Bekisting 1.12 M2 167,888.75 0.006 -

7 Plat lantai, t =130 mm


Beton K-300 25.58 M3 25,813,801.20 0.982 -
Besi beton 2,818.76 Kg 36,672,067.60 1.395 -
Bekisting 8.37 M2 692,888.13 0.026 -

8 Plat lantai, t =100 mm


Beton K-300 0.81 M3 817,403.40 0.031 -
Besi beton 79.15 Kg 1,029,741.50 0.039 -
Bekisting 1.44 M2 119,206.56 0.005 -

9 Pelat Beton Canopy Jendela t= 10 cm


Beton K-300 9.12 M3 9,203,356.80 0.350 -
Besi beton 3,131.37 Kg 40,739,123.70 1.549 -
Bekisting 91.16 M2 7,546,437.51 0.287 -

C PEKERJAAN LANTAI DAK 113,874,928.03 4.33 -


1 Kolom K1
Beton K-300 0.66 M3 666,032.40 0.025 -
Besi beton 237.69 Kg 3,092,346.90 0.118 -
Bekisting 7.01 M2 617,252.70 0.023 -

2 Kolom K2
Beton K-300 0.39 M3 393,564.60 0.015 -
Besi beton 118.68 Kg 1,544,026.80 0.059 -
Bekisting 5.14 M2 452,593.28 0.017 -

3 Kolom K3
Beton K-300 2.31 M3 2,331,113.40 0.089 -
Besi beton 831.96 Kg 10,823,799.60 0.412 -
Bekisting 38.52 M2 3,391,807.98 0.129 -

4 Balok B1.2
Beton K-300 6.39 M3 6,448,404.60 0.245 -
Besi beton 2,172.35 Kg 28,262,273.50 1.075 -
Bekisting 97.98 M2 14,687,267.32 0.559 -

5 Balok BA.2
Beton K-300 0.86 M3 867,860.40 0.033 -
Besi beton 176.00 Kg 2,289,760.00 0.087 -
Bekisting 10.80 M2 1,618,927.20 0.062 -

6 B.3
Beton K-300 0.08 M3 80,731.20 0.003 -
Besi beton 31.06 Kg 404,090.60 0.015 -
Bekisting 1.12 M2 167,888.75 0.006 -

7 Plat Dak t=15 cm


Beton K-300 4.98 M3 5,025,517.20 0.191 -
Besi beton 324.83 Kg 4,226,038.30 0.161 -
Bekisting 6.12 M2 506,627.88 0.019 -

8 Dudukan Water Tank Plat Dak t=20 cm + Beton Pengikat


Beton K-300 5.40 M3 5,449,356.00 0.207 -
Besi beton 1,452.51 Kg 18,897,155.10 0.719 -
Bekisting 5.40 M2 447,024.60 0.017 -

9 Beton Tanggulan
Beton K-300 0.42 M3 423,838.80 0.016 -
Besi beton 22.31 Kg 290,253.10 0.011 -
Bekisting 5.67 M2 469,375.83 0.018 -

D RING BALK 73,715,384.81 2.80 -


1 Balok B1.3
Beton K-300 14.82 M3 14,955,454.80 0.569 -
Besi beton 2,721.35 Kg 35,404,763.50 1.347 -
Bekisting 151.45 M2 22,702,455.97 0.863 -

2 Balok B.3
Beton K-300 0.08 M3 80,731.20 0.003 -
Besi beton 31.06 Kg 404,090.60 0.015 -
Bekisting 1.12 M2 167,888.75 0.006 -

E SOPI-SOPI 13,694,980.93 0.52 -


1 Kolom K1 (sopi-sopi)
Beton K-300 0.74 M3 746,763.60 0.028 -
Besi beton 243.83 Kg 3,172,228.30 0.121 -
Bekisting 7.92 M2 697,381.08 0.027 -

2 Kolom K2 (sopi-sopi)
Beton K-300 0.23 M3 232,102.20 0.009 -
Besi beton 81.18 Kg 1,056,151.80 0.040 -
Bekisting 3.12 M2 274,725.88 0.010 -

3 Balok B1.3 (sopi-sopi)


Beton K-300 1.14 M3 1,150,419.60 0.044 -
Besi beton 313.43 Kg 4,077,724.30 0.155 -
Bekisting 15.26 M2 2,287,484.17 0.087 -

F RANGKA ATAP BAJA 69,462,159.87 2.64 -


1 Atap Bagian Bawah
Pekerjaan rangka atap baja ringan 265.52 M2 41,865,600.48 1.592 -

2 Atap Bagian Atas


Pipa baja 4, T = 3.2 mm 714.00 Kg 23,104,897.20 0.879 -
Base plate t= 6mm 15.07 Kg 487,662.19 0.019 -
Mur Baut A325 HTB Dia 12 mm 32.00 bh 2,024,000.00 0.077 -
Pekerjaan Groutig (sika grout) 24.00 titik 1,980,000.00 0.075 -
II.A. (2) PEKERJAAN ARSITEKTUR STANDAR 880,139,959.13 33.48
A PEKERJAAN LANTAI SATU 394,910,627.03 15.02
A.1. PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 188,929,490.95 7.19 -
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tangga 332.29 M2 47,548,173.60 1.808 -
Pek. Plesteran Trasram (12) 82.25 M2 5,217,078.02 0.198 -
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. Bag. Dalam 582.33 M2 45,223,747.80 1.720 -
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jendela & Entrance 449.24 M2 28,647,339.38 1.090 -
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dinding 380.40 M1 30,709,311.60 1.168 -
Hand railing stainless steel 2,5 22.52 M1 3,520,457.78 0.134 -
Pek. Keramik 20x25 Dinding KM/WC, R. Wudhu, Koridor KM 92.48 M2 14,315,672.80 0.544 -
Pek. Plint Homogenous Tile 10x60 Dinding Coridor/Selasar dan Unit Hunian 120.40 M1 5,027,369.42 0.191 -
Waterproofing (liquid/cement base) dinding t=2,1m, km/wc (dinding luar) 84.42 M2 7,376,140.09 0.281 -
Pasang Cover Plumbing di Kolom Entrace kalsiboard & rangka besi hollow 4/4 7.20 M2 1,344,200.46 0.051 -

A.2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING 97,311,837.02 3.70 -
Kusen Alumunium Powder Coating+ Daun Rk Alumunium + Kaca Clear 8mm + Door Stoper + Jendela 1.00 Unit 8,395,034.40
kaca clear 6mm + Sandblast + Jaring Nyamuk (lengkap terpasang) type PJ-1 0.319 -

Kusen Alumunium Powder Coating + Daun Rk Alumunium + Kaca Clear 8mm + Sandblast + door stoper 2.00 Unit 6,149,826.31
0.234 -
+ Jalusi Alumunium + Jaring Nyamuk (lengkap terpasang) type P-1
Kusen Alumunium Powder Coating + Daun Pintu Engineering Honeycomb Wood + Jalusi Alumunium + 2.00 Unit 5,391,600.05
0.205 -
Jaring Nyamuk (lengkap terpasang) type P-2
Kusen Alumunium Powder Coating, Rangka Daun Pintu Alumunium + Louvre Alumunium (lengkap 8.00 Unit 18,090,815.07
0.688 -
terpasang) type PT
Kusen Alumunium Powder Coating, Rangka Daun Pintu Alumunium + Louvre Alumunium (lengkap 1.00 Unit 2,261,351.88
0.086 -
terpasang) type PTD
Kusen Alumunium Powder Coating + Daun Pintu Alumunium (lengkap terpasang) type PS 2.00 Unit 4,093,309.65 0.156 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J1 4.00 Unit 15,924,403.39 0.606 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J2 4.00 Unit 8,522,210.66 0.324 -
Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 22.00 Unit 11,097,345.60 0.422 -
Pasang Ornamen Type OW 3.56 Unit 4,401,940.00 0.167 -
Pasang Ornamen, Type JOW 6.00 Unit 12,984,000.00 0.494 -

A.3. PEKERJAAN PLAFOND 29,302,904.02 1.11 -


Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm 135.59 M2 20,379,910.27 0.775 -
Pek. Penutup Plafond GRC T=4 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 34.20 M2 5,160,711.60 0.196 -
List plafond gypsum 5 cm 209.19 M1 3,762,282.15 0.143 -

A.4. PEKERJAAN LANTAI 39,074,829.83 1.49 -


Pek. Pasang Homogenous Tile polish lantai Unit Hunian, Koridor, Tangga Uk. 60x60 cm 131.51 M2 27,179,548.80 1.034 -
Pek. Screed Fininshing Skim Coat 48.38 M2 4,612,869.72 0.175 -
Pek. Pasang Keramik lantai km/wc, Selasar KM & R. Wudhu Uk. 20x20 cm tekstur 37.40 M2 4,972,386.10 0.189 -
Pasang Homogenous Tile Step Nozing Tangga Entrance Uk. 10 x 60 cm 24.00 m 1,107,754.56 0.042 -
Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela + Canopy Entrance 13.76 M2 1,202,270.64 0.046 -

A.5. PEKERJAAN UTILITAS 9,400,710.00 0.36 -


Pasang Closet Jongkok Type Standart (Lengkap Terpasang) 4.00 Buah 1,185,580.00 0.045 -
Pasang Closet Duduk (lengkap terpasang) 1.00 Buah 1,599,730.00 0.061 -
Pasang Kran 0,5 Stainless (Lengkap Terpasang) 14.00 Buah 1,018,248.00 0.039 -
Pasang Shower Fix Shower + Stop Kran (Lengkap Terpasang) 4.00 Buah 2,208,976.00 0.084 -
Pasangan Floor Drain Stainless , di Toilet, di Teras, termasuk coring beton 18.00 Buah 3,388,176.00 0.129 -

A.6. PEKERJAAN PENGECATAN 18,304,761.82 0.70 -


Cat dinding bag. Luar termasuk kolom (exterior) 208.56 M2 7,589,310.70 0.289 -
Cat dinding bag. Dalam termasuk kolom (interior) 353.59 M2 6,961,020.25 0.265 -
Cat plafond 169.79 M2 3,342,604.79 0.127 -
Cat list plafond 209.19 M1 411,826.08 0.016 -

A.7. PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS DI FACADE DAN SELASAR KELILING 12,586,093.39 0.48 -
BANGUNAN
Pek. Pasang Hand Railling Ramp Pipa Besi Stailess steel dia 3/4 20.29 M1 3,171,851.17 0.121 -
Pek. Pasang Hand Railling Ramp Pipa Besi Stainless Steel dia 1 9.50 M1 1,485,095.42 0.056 -
Pek. Pasang Hand Railling Ramp Pipa Besi Stainless Steel dia 2 10.81 M1 1,689,882.26 0.064 -
Pasang Beton Ramp 0.53 M3 636,352.03 0.024 -
Pasang Homogenous Tile unpolish lantai Ramp Uk. 60x60 8.76 M2 1,997,821.08 0.076 -
Pasangan rollag bata tangga entrance depan & samping + Ramp 16.37 M2 3,605,091.44 0.137 -

B PEKERJAAN LANTAI DUA 338,492,748.21 12.87


B.1. PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 135,221,369.25 5.14 -
Pek. Pasangan Dinding Bata Ringan t=10 cm Termasuk Dinding Railling Tangga 239.96 M2 34,336,452.30 1.306 -
Pek. Plesteran Trasram (12) 77.31 M2 4,903,736.19 0.187 -
Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. Bag. Dalam 162.65 M2 12,631,399.00 0.480 -
Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jendela 340.08 M2 21,686,375.16 0.825 -
Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dinding 375.40 M1 30,305,666.60 1.153 -
Pek. Pasang Hand Railling Tangga Pipa Stainless Steel dia 2,5 107.20 M1 16,758,129.39 0.637 -
Pek. Keramik 20x25 Dinding KM/WC, R. Wudhu, Koridor KM 92.48 M2 14,315,672.80 0.544 -
Pek. Plint Homogenous Tile 10x60 Dinding Coridor/Selasar dan Unit Hunian 6.80 M1 283,937.81 0.011 -

B.2. PEKERJAAN Kusen PINTU / JENDELA + ASSESORIES & RAILING 98,666,118.00 3.75 -
Kusen Alumunium Powder Coating+ Daun Rk Alumunium + Kaca Clear 8mm + Door Stoper + Jendela 1.00 Unit 8,395,034.40
0.319 -
kaca clear 6mm + Sandblast + Jaring Nyamuk (lengkap terpasang) type PJ-1
Kusen Alumunium Powder Coating + Daun Pintu Engineering Honeycomb Wood + Jalusi Alumunium + 2.00 Unit 5,391,600.05
0.205 -
Jaring Nyamuk (lengkap terpasang) type P-2
Kusen Alumunium Powder Coating, Rangka Daun Pintu Alumunium + Louvre Alumunium (lengkap 10.00 Unit 22,613,518.84
0.860 -
terpasang) type PT
Kusen Alumunium Powder Coating + Daun Pintu Alumunium (lengkap terpasang) type PS 2.00 Unit 4,093,309.65 0.156 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J1 4.00 Unit 15,924,403.39 0.606 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J2 4.00 Unit 8,522,210.66 0.324 -
Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 20.00 Unit 10,088,496.00 0.384 -
Pasang Ornamen Type OW 6.73 m2 8,321,645.00 0.317 -
Pasang Ornamen, Type JOW 6.00 Unit 12,984,000.00 0.494 -
Railing Balkon type R1 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & 2.00 Unit 1,131,800.00
0.043 -
asesoris & terpasang
Railing Balkon type R2 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & 1.00 Unit 1,200,100.00
0.046 -
asesoris & terpasang

B.3. PEKERJAAN PLAFOND 29,302,904.02 1.11 -


Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm 135.59 M2 20,379,910.27 0.775 -
Pek. Penutup Plafond GRC T=4 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 34.20 M2 5,160,711.60 0.196 -
Pek. List Plafond Gypsum 5/5 209.19 M2 3,762,282.15 0.143 -

B.4. PEKERJAAN LANTAI 50,234,879.34 1.91 -


Pek. Pasang Homogenous Tile polish lantai Unit Hunian, Koridor, Tangga dan Balkon Uk. 60x60 cm 194.04 M2 40,102,803.21 1.525 -
Pek. Pasang Keramik lantai km/wc, Selasar KM & R. Wudhu Uk. 20x20 cm tekstur 40.53 M2 5,388,524.30 0.205 -
Pek. Waterproofing (liquid/cement base) Lantai + Dinding t=210 cm Toilet, R Cuci 40.53 M2 3,541,281.19 0.135 -
Pek. Waterproofing (liquid/cement base) di Daerah Canopy Jendela 13.76 M2 1,202,270.64 0.046 -
B.5. PEKERJAAN UTILITAS 8,177,444.00 0.31 -
Pasang closet Jongkok type standart (lengkap terpasang) 4.00 Buah 1,185,580.00 0.045 -
Pasang kran 0,5 stainless (lengkap terpasang) 14.00 Buah 1,018,248.00 0.039 -
Pasang shower Fix Shower + stop Kran (lengkap terpasang) 4.00 Buah 2,208,976.00 0.084 -
Pasangan floor drain stainless , di Toilet di Teras, termasuk coring beton 20.00 Buah 3,764,640.00 0.143 -

B.6. PEKERJAAN PENGECATAN 16,890,033.61 0.64 -


Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) 216.82 M2 7,889,884.66 0.300 -
Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) 266.46 M2 5,245,718.08 0.200 -
Pek. Cat Plafond 169.79 M2 3,342,604.79 0.127 -
Pek. Cat List Plafond 209.19 M 411,826.08 0.016 -

C PEKERJAAN LANTAI DAK DAN ATAP 146,736,583.88 5.58


C.1. PEKERJAAN PASANGAN DINDING & BETON PRAKTIS 34,166,291.65 1.30 -
Pasangan dinding bata ringan t=10 cm 106.16 M2 15,190,689.18 0.578 -
Plester + aci (13) mortar dinding exterior/dind. Terluar/dalam 106.16 M2 8,244,385.60 0.314 -
Perapihan kolom/balok beton dan beton expose 61.74 M2 3,937,064.23 0.150 -
Kolom & Balok praktis 11/11 Kusen 84.16 M2 6,794,152.64 0.258 -

C.2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING 20,931,538.61 0.80 -
Pintu besi Lengkap terpasang Type PD 2.00 Unit 7,840,200.00 0.298 -
Pasang Glass Block Type GB-1 8.00 Unit 7,401,856.00 0.282 -
Pasang Ornamen Type OW 2.88 M2 3,561,120.00 0.135 -
Pas. Logo PU Plat Baja 80 x 80 t=3mm finish cat duco warna doff terpasang 1.00 Unit 2,128,362.61 0.081 -

C.3. PEKERJAAN PLAFOND 9,243,539.83 0.35 -


Pek. Beton Expose 12.79 M2 815,598.50 0.031 -
Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 32.66 M2 4,928,328.68 0.187 -
Perapihan dak dan balok beton di Tower air 54.88 M2 3,499,612.65 0.133 -

C.4. PEKERJAAN LANTAI 9,293,214.00 0.35 -


Waterproofing Membran Bakar t=3cm Lantai Dak Torn (elv. +13,8) + 15 cm Pada Tanggulan 22.64 M2 5,071,045.87 0.193 -
Pek. Screed + Aci Lantai Dak Torn (elv. +13,8) 22.64 M2 2,158,647.59 0.082 -
Cat Epoxy 500 micron Lantai Dak 22.64 M2 2,063,520.54 0.078 -

C.5. PEKERJAAN UTILITAS 4,058,445.84 0.15 -


Pasang Roof Drain Stainless (lengkap terpasang) 12.00 Buah 1,058,445.84 0.040 -
Pasang Tangga Lipat akses ke lantai dak 2.00 Ls 3,000,000.00 0.114 -

C.6. PEKERJAAN PENGECATAN 5,826,299.39 0.22 -


Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) 93.39 M2 3,398,378.05 0.129 -
Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) 72.40 M2 1,425,317.08 0.054 -
Pek. Cat Plafond 45.44 M2 894,563.65 0.034 -
Pek. Cat List Plafond 54.88 M1 108,040.61 0.004 -

C.7. PEKERJAAN PENUTUP ATAP 63,217,254.57 2.40 -


Atap Genteng metal berpasir T=0,35 mm 355.49 M2 55,310,511.36 2.104 -
Nok Genteng Metal 33.10 M1 2,174,041.10 0.083 -
Lisplang GRC tebal 9 mm lebar 30 cm + cat exterior 94.90 M1 5,732,702.12 0.218 -
II.B. (2) PEKERJAAN ARSITEKTUR NON STANDAR 259,741,640.78 9.88
A PEKERJAAN KELILING BANGUNAN DAN TANAMAN 25,454,600.00 0.97 -
Pek. Tanah Subur t = 7 cm 32.00 M3 5,209,600.00 0.198 -
Pek. Tanaman Rumput Gajah Mini 160.00 M2 3,520,000.00 0.134 -
Pek. Tanaman Kacang-kacangan 150.00 Bh 750,000.00 0.029 -
Pek. Tanaman Rolia Ungu 50.00 Bh 500,000.00 0.019 -
Pek. Tanaman Pohon Zodia T= 25-40 cm 50.00 Btg 700,000.00 0.027 -
Pek. Tanaman Pohon Mangga diameter 10 - 15 cm Tinggi =2,5 m 4.00 Btg 1,056,000.00 0.040 -
Pek. Tanaman Pohon Kelengkeng diameter 10 - 15 cm Tinggi = 2,5 m 4.00 Btg 1,056,000.00 0.040 -
Pek. Tanaman Pohon Rambutan diameter 10 - 15 cm Tinggi = 2,5 m 4.00 Btg 528,000.00 0.020 -
Pek. Tanaman Pohon Tabebuya diamater 10 - 15 cm Tinggi = 3 m 3.00 Btg 3,735,000.00 0.142 -
Pek. Tanaman Pohon Ketapang Kencana diameter 10 - 15 cm Tinggi = 3 Meter 4.00 Btg 1,400,000.00 0.053 -
Pek. Pohon Pucuk Merah Tinggi = 2 meter 20.00 Btg 7,000,000.00 0.266 -

B PEKERJAAN PERKERASAN AKSES JALAN MASUK 49,522,640.00 1.88 -


Pek. Pasir Urug t = 7 cm di Bawah Paving 35.00 M3 8,362,200.00 0.318 -
Pek. Paving Blok t = 6 cm (standart) 40.00 M2 8,857,200.00 0.337 -
Pek. Kanstein uk. 8.40.20 Jalan Sekeliling Bangunan 120.00 M1 11,937,840.00 0.454 -
Pek. Grass Blok t = 6 cm (standart) 100.00 M2 20,365,400.00 0.775 -

C PEKERJAAN PAGAR KELILING 112,318,465.14 4.27 -


Pek. Galian Tanah 32.40 M3 1,846,009.44 0.070 -
Pek. Urugan Pasir 2.70 M3 651,142.80 0.025 -
Pek. Pasangan Pondasi Batu Belah 25.92 M3 20,043,223.20 0.762 -
Pek. Sloof Praktis 108.00 M 8,718,732.00 0.332 -
Pek. Kolom Praktis 74.00 M 5,973,946.00 0.227 -
Pek. Balok Praktis 108.00 M 8,718,732.00 0.332 -
Pekerjaan Pasangan Bata Merah 1/2 Bata 102.60 M2 11,000,915.64 0.418 -
Pek. Plesteran 205.20 M2 12,474,822.10 0.474 -
Pek. Acian 205.20 M2 7,249,844.25 0.276 -
Pek. Roster 20x20 cm 82.08 M2 23,693,828.40 0.901 -
Pek. Pengecatan Eksterior 328.32 M2 11,947,269.31 0.454 -

D PEKERJAAN KURSI TAMAN (6SET) 23,020,581.06 0.88 -


Pek. Grass Blok 19.20 M2 3,910,156.80 0.149 -
Pek. Pas. Batu Belah 9.00 M2 6,959,452.50 0.265 -
Pek. Batu Alam 19.80 M2 4,474,156.50 0.170 -
Pek. Pasangan 1/2 Bata 12.00 M2 1,286,656.80 0.049 -
Pek. Plester Aci 12.00 M2 1,153,489.26 0.044 -
Pek. Pengecatan 12.00 M2 436,669.20 0.017 -
Pekerjaan Pengecoran meja Taman dia 80cm t8cm+Pembesian+Fin. Coating 0.96 M3 4,800,000.00 0.183 -

E DRAINASE LUAR/SEKELILING BANGUNAN 21,630,244.70 0.82 -


Pek. Pasangan 1/2 Bata Saluran 45.60 M2 4,889,295.84 0.186 -
Pek. Plesteran 13 68.40 M2 4,158,274.03 0.158 -
Pek. Acian 68.40 M2 2,416,614.75 0.092 -
Pek. Pasir Urug t = 10 cm 1.14 M3 274,926.96 0.010 -
Pek. Galian Tanah Saluran 15.20 M3 866,029.12 0.033 -
Pek. Buis Beton Setengah Lingkaran 30 cm 76.00 M1 4,213,440.00 0.160 -
Pek. Gorong-Gorong dia. 60 cm Menuju Ke Riol Kota 25.00 M1 3,036,000.00 0.115 -
Pek. Grill penutup saluran, besi siku 50.50.5 + plat strip 9.60 M1 1,775,664.00 0.068 -

F BAK KONTROL 1,097,127.18 0.04 -


Pek. Pasangan 1/2 Bata Bak Kontrol ( 4 unit BK ) 6.03 M2 646,545.04 0.025 -
Pek. Plester + Aci 3.33 M2 320,093.27 0.012 -
Pek. Pasir Urug t = 5 cm 0.13 M3 31,351.32 0.001 -
Pek. Galian Tanah 1.74 M3 99,137.54 0.004 -

G PEKERJAAN GROUND TANK, RUANG POMPA DAN AKSESORIS 6,826,194.84 0.26 -


RUANG POMPA
Pek. Acian Kolom dan Ring Balok 10.50 M2 370,971.56 0.014 -
Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan Dinding 26.50 M2 2,315,419.48 0.088 -
Pek. Pasang Lantai Keramik 20x20 18.00 M2 2,393,127.00 0.091 -
Pek. Cat Dinding menggunakan cat exterior 48.00 M2 1,746,676.80 0.066 -

H AKSESORIS 19,871,787.87 0.76 -


Pek. Pembuatan Lemari Surat 1.00 unit 18,783,270.00 0.714 -
Pek. Nama Ruangan 10x20 cm -acrylic (lengkap terasang) 4.00 unit 272,604.18 0.010 -
Pek. Papan Informasi Denah Bangunan 60x120 cm -acrylic (lengkap terpasang) 2.00 unit 815,913.68 0.031 -
II.A. (3) PEKERJAAN MEP STANDAR 113,090,636.68 4.30
A PEKERJAAN LANTAI 1 1.426
1 PEMIPAAN AIR BERSIH 2,660,284.57 0.10 -
Pipa PVC AW (Incl. Fitting & Accessories)
PVC AW dia. 15 33.00 M1 799,115.63 0.030 -
PVC AW dia. 25 24.60 M1 695,334.38 0.026 -
PVC AW dia. 40 (1,5) (Riser dari Tangki Air Atas) 12.60 M1 567,581.17 0.022 -
Peralatan Katup-katup
(Ball Valve & Gate Valve)
dia. 40 4.00 bh 598,253.39 0.023 -

2 PEMIPAAN AIR KOTOR & AIR BEKAS 6,556,867.06 0.25 -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
dia. 100 (Pipa Air Kotor ) 26.50 M1 2,478,919.31 0.094 -
dia. 100 ( Pipa Air Bekas) 14.80 M1 1,384,453.05 0.053 -
dia. 80 (Pipa Air Bekas) 31.80 M1 2,001,825.90 0.076 -
CO, dia. 100 8.00 bh 691,668.80 0.026 -

3 PEMIPAAN AIR HUJAN 6,558,160.95 0.25 -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
dia. 150 10.80 M1 1,855,916.55 0.071 -
dia. 100 21.60 M1 2,020,553.10 0.077 -
dia. 80 42.60 M1 2,681,691.30 0.102 -

3 PEMIPAAN VENT 970,600.13 0.04 -


Pipa PVC Kelas D (Incl. Fitting & Accessories)
Dia. 80 ( pipa riser ) 17.00 M1 970,600.13 0.037 -

4 INSTALASI PANEL 5,440,272.00 0.21 -


Pengadaan dan pemasangan PP-LT.1 1.00 unit 5,440,272.00 0.207 -
dengan komponen panel, sbb
MCCB 3P, 75 A
MCB 1P, 6 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 63 A
Accessories & Termination
Box Panel

5 INSTALASI KABEL FEEDER 210,577.74 0.01 -


Kabel Distribusi Daya dari MDP
NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.1 5.00 M1 210,577.74 0.008 -

6 INSTALASI KABEL TRAY 3,115,252.00 0.12 -


Kabel Tray W200 x H100 24.90 M1 2,638,726.90 0.100 -
Elbow W200 x H100 1.00 bh 133,481.25 0.005 -
Tee W200 x H100 1.00 bh 143,043.85 0.005 -
Material bantu ( mur, baut, hanger rod, supporting, dll ) 1.00 lot 200,000.00 0.008 -

7 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 4,914,678.94 0.19 -


Lampu LED 9 Watt 17.00 bh 1,335,093.30 0.051 -
Lampu LED 9 Watt, c/w battery charger (Selasar) 4.00 bh 1,072,407.60 0.041 -
Lampu LED 7 Watt 12.00 bh 866,592.00 0.033 -
Lampu LED 7 Watt, c/w battery charger (Selasar) 2.00 bh 523,566.00 0.020 -
Lampu baret isi TL Bulat-20 watt c/w battery charger 1.00 bh 337,559.65 0.013 -
Stop Kontak 1P, 220 Volt, 10A, Wall Type 18.00 bh 433,630.00 0.016 -
Saklar 2 Gang 9.00 bh 242,880.46 0.009 -
Saklar Hotel 1 Gang 1.00 bh 27,913.49 0.001 -
Saklar Hotel 2 Gang 2.00 bh 75,036.44 0.003 -

8 INSTALASI PENERANGAN & STOP KONTAK 7,064,897.78 0.27 -


NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 36.00 ttk 4,433,103.37 0.169 -
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 18.00 ttk 2,631,794.41 0.100 -

B PEKERJAAN LANTAI 2 1.189


1 PEMIPAAN AIR BERSIH 2,335,952.47 0.09 -
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
PVC AW dia. 15 33.00 M1 799,115.63 0.030 -
PVC AW dia. 25 24.60 M1 695,334.38 0.026 -
PVC AW dia. 40 5.40 M1 243,249.08 0.009 -
Gate Valve dia. 40 4.00 bh 598,253.39 0.023 -

2 PEMIPAAN AIR KOTOR & AIR BEKAS 3,659,320.16 0.14 -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
dia. 100 (pipa air kotor ) 15.70 M1 1,468,642.76 0.056 -
dia. 80 (pipa air bekas ) 34.80 M1 2,190,677.40 0.083 -

3 PEMIPAAN AIR HUJAN 3,754,710.34 0.14 -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
dia. 150 6.60 M1 1,134,171.22 0.043 -
dia. 100 13.20 M1 1,234,782.45 0.047 -
dia. 80 19.80 M1 1,246,419.90 0.047 -
Roof Drain, Cast Iron
dia. 80 2.00 bh 139,336.76 0.005 -
4 PEMIPAAN VENT 559,522.43 0.02 -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
Dia. 80 ( pipa riser ) 9.80 M1 559,522.43 0.021 -

5 INSTALASI PANEL 5,440,272.00 0.21 -


Pengadaan dan pemasangan PP-LT.2 1.00 unit 5,440,272.00 0.207 -
dengan komponen panel, sbb
MCCB 3P, 63 A
MCB 1P, 6 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 63 A
Accessories & Termination
Box Panel

6 INSTALASI KABEL FEEDER 421,155.49 0.02 -


Kabel Distribusi Daya dari MDP
NYY 4 x 10 mm2 + E-NYA 6 mm2 ke PP-LT.2 10.00 M1 421,155.49 0.016 -

7 INSTALASI KABEL TRAY 3,115,252.00 0.12 -


Kabel Tray W200 x H100 24.90 M1 2,638,726.90 0.100 -
Fitting-Fitting
Elbow W200 x H100 1.00 bh 133,481.25 0.005 -
Tee W200 x H100 1.00 bh 143,043.85 0.005 -
Material bantu ( mur, baut, hanger rod, supporting, dll ) 1.00 lot 200,000.00 0.008 -

8 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 4,914,678.94 0.19 -


Lampu LED 9 Watt 17.00 bh 1,335,093.30 0.051 -
Lampu LED 9 Watt, c/w battery charger (Selasar) 4.00 bh 1,072,407.60 0.041 -
Lampu LED 7 Watt 12.00 bh 866,592.00 0.033 -
Lampu LED 7 Watt, c/w battery charger (Selasar) 2.00 bh 523,566.00 0.020 -
Lampu baret isi TL Bulat-32 watt c/w battery charger 1.00 bh 337,559.65 0.013 -
Stop Kontak 1P, 220 Volt, 10A, Wall Type 18.00 bh 433,630.00 0.016 -
Saklar 2 gang 9.00 bh 242,880.46 0.009 -
Saklar Hotel 1 gang 1.00 bh 27,913.49 0.001 -
Saklar Hotel 2 gang 2.00 bh 75,036.44 0.003 -

9 INSTALASI PENERANGAN & STOP KONTAK 7,064,897.78 0.27 -


NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 36.00 ttk 4,433,103.37 0.169 -
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 18.00 ttk 2,631,794.41 0.100 -

C PEKERJAAN LANTAI ATAP 0.256


1 PEMIPAAN AIR BERSIH 3,247,626.25 0.12 -
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
PVC AW dia. 40 (Riser ke tanki air atas) 24.20 M1 1,090,116.22 0.041 -
PVC AW dia. 80 (Header) 4.00 M1 251,802.00 0.010 -
Gate Valve dia. 40 12.00 bh 1,794,760.18 0.068 -
Gate Valve dia. 32 1.00 bh 110,947.85 0.004 -

2 PEMIPAAN AIR HUJAN 2,738,919.38 0.10 -


Pipa PVC Kelas AW (Incl. Fitting & Accessories)
Roof Drain, Cast Iron
dia. 150 5.00 M1 859,220.63 0.033 -
dia. 100 10.00 M1 935,441.25 0.036 -
dia. 80 15.00 M2 944,257.50 0.036 -

3 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 195,877.88 0.01 -


Lampu LED 9 Watt 2.00 bh 157,069.80 0.006 -
Saklar 1 gang 2.00 bh 38,808.08 0.001 -

4 INSTALASI PENERANGAN & STOP KONTAK 538,705.12 0.02 -


NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 2.00 ttk 246,283.52 0.009 -
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 2.00 ttk 292,421.60 0.011 -

D PEKERJAAN UTILITAS 0.943


P-PLN (BY PLN)
MCCB 3P, 200 A 1 bh
Accessories & Termination 1 lot
Box Panel 1 unit

1 INSTALASI PANEL 19,188,938.63 0.73 -


a PEKERJAAN LV-MDP
Pengadaan dan pemasangan LV-MDP, dengan komponen panel, 1.00 unit 14,648,815.00 0.557 -
sbb
MCCB 3P, 63 A
MCCB 3P, 20 A
MCCB 3P, 16 A
MCB 3P, 16 A
Contacto, (timer switch)
Earth Fault Relay
Over Current Relay
Over / Under Voltage Relay
Power Factor-meter
Frequency-metr
Ampere-meter 300/5 A
Ampere-meter 50/5 A
Volt-meter 0-500 Volt
Volt Selector Switch
CT 300/5 A
CT 50/5 A
Fuse Carrier 4 A
Indicator Lamp
Rel MCCB 3P
CU Bar 5 x 80 A
Accessories & Termination
Box Panel

b P-POMPA AIR BERSIH


Pengadaan dan pemasangan P-POMPA AIR BERSIH, dengan komponen panel 1.00 unit 4,540,123.63 0.173 -
MCB 3P, 20 A
MCB 3P, 10 A
WLC 61F G-AP 220 Volt
DOL ( Direct On Line )
Radar diantaki air atas
Fuse 2 A
Indicator Lamp
Rel MCB 3P
Cu Bar 5 x 32 A
Accessories & Termination
Box Panel

2 INSTALASI KABEL FEEDER 4,539,547.31 0.17 -


NYFGbY 4 x 10 mm2 + E-NYA 10 mm2 Dari P-PLN ke LV-MDP 50.00 M1 2,105,777.44 0.080 -
Kabel Distribusi Daya dari LV-MDP
NYY 4 x 6 mm2 + E-NYA 6 mm2 ke P-Air Bersih 40.00 M1 1,370,934.90 0.052 -
NYY 4 x 4 mm2 + E-NYA 4 mm2 ke P-Shallow Well Pump 40.00 M1 1,062,834.97 0.040 -

3 INSTALASI ARMATUR LAMPU, SAKLAR & STOP KONTAK 362,996.23 0.01 -


a Ruang Pompa
TL 1 x 18 W, TL Balk Type 2.00 bh 300,097.60 0.011 -
Stop Kontak 1P, 220 Volt, 13A, Wall Type 1.00 bh 24,090.56 0.001 -
Saklar 1 gang 2.00 bh 38,808.08 0.001 -

4 INSTALASI PENERANGAN & STOP KONTAK 692,494.32 0.03 -


a Ruang Pompa
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 2.00 ttk 246,283.52 0.009 -
NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 1.00 ttk 146,210.80 0.006 -
Testing & Commissioning 1.00 lot 300,000.00 0.011 -

E PEKERJAAN SISTEM PENTANAHAN 5,582,530.88 0.21 -


Pentanahan (Grounding) Netral Sistem & Pentanahan Body
a Body Panel
Grounding Rod GIP 1 (untuk R lebih kecil dari 2 ohm) 1.00 bh 309,427.51 0.012 -
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
Termination R.Supporting Material 1.00 lot 351,553.51 0.013 -
Kabel BC 50 mm2 30.00 M1 1,830,284.43 0.070 -
Testing & Commissioning 1.00 lot 300,000.00 0.011 -
b Body Peralatan pada Sistem Elektronik
Grounding Rod GIP 1 (untuk R lebih kecil dari 2 ohm) 1.00 bh 309,427.51 0.012 -
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
Termination R.Supporting Material 1.00 lot 351,553.51 0.013 -
Kabel BC 50 mm2 30.00 M1 1,830,284.43 0.070 -
Testing & Commissioning 1.00 lot 300,000.00 0.011 -

F PEKERJAAN PENANGKAL PETIR (FARADAY) 7,245,647.93 0.28 -


Splitzen T=1 meter, pipa galvanized c/w peralatan bantu 5.00 unit 2,111,315.00 0.080 -
Grounding box/ Bak kontrol 40x40x30 cm 1.00 unit 225,175.51 0.009 -
Down Conduktor BC 50mm + accessories 58.00 M1 3,538,549.90 0.135 -
Grounding System max. 2 ohm 1.00 lot 309,427.51 0.012 -
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
Testing & Comissioning included perijinan dari DEPNAKER 1.00 lot 1,061,180.02 0.040 -
II.B. (3) PEKERJAAN MEP NON STANDAR 116,829,743.91 4.44
A PEKERJAAN PEMADAM KEBAKARAN (APAR) 1,224,301.92 0.05 -
a LANTAI 1
Fire Extinguisher Type Class ABC 3,5 kg DCP Seamless, c/w support 3.00 bh 612,150.96 0.023 -

b LANTAI 2
Fire Extinguisher Type Class ABC 3,5 kg DCP Seamless, c/w support 3.00 bh 612,150.96 0.023 -

B PEKERJAAN VENTILASI UDARA 13,489,356.14 0.51 -


a LANTAI 1
Exhaust kap 200 Cfm ( ceiling Mounted ) 2.00 unit 1,805,400.00 0.069 -
Kipas Angin Baling 4.00 unit 2,000,000.00 0.076 -
Pipa PVC Class D diameter 100 18.80 m 1,263,719.55 0.048 -
Grille 200 x 200 (Alumunium) 10.00 bh 1,429,275.00 0.054 -
Install Kipas Angin Baling (Kabel NYM 3x2,5 mm2 + Conduit pipa dia. 20) 4.00 titik 492,567.04 0.019 -

b LANTAI 2
Exhaust kap 200 Cfm ( ceiling Mounted ) 2.00 unit 1,805,400.00 0.069 -
Kipas Angin Baling 4.00 unit 2,000,000.00 0.076 -
Pipa PVC Class D diameter 100 18.80 m 1,263,719.55 0.048 -
Grille 200 x 200 (Alumunium) 10.00 bh 1,429,275.00 0.054 -

C PEKERJAAN INSTALASI PLUMBING 71,545,456.40 2.72 -


C.1. INSTALASI AIR BERSIH
PERALATAN UTAMA
Pengadaan dan pemasangan unit
1 Lift Pump 2.00 bh 10,424,058.64 0.396 -
Kapasitas 80 liter/menit
Head 20 meter
Speed 2900 rpm
PI 1,5 KW/380V/50Hz/3ph

2 Booster Pump / Distribution Pump 2.00 set 10,770,000.00 0.410 -


Type Jet Pump
Kapasitas 27 liter/menit
Head 24 meter
Daya 250 W/220V/50Hz/1ph

4 Tangki Air Atas ( Type Cylinder ) 2.00 unit 3,270,133.06 0.124 -


Kapasitas 1500 liter
Tangki PE, lengkap dengan Assesories dan dudukan

5 Pekerjaan Shallow Well 1.00 unit 26,840,280.00 1.021 -


a Pembuatan / Pengeboran sumur shallow well
Kedalaman + 60 Meter
Pipa Casing , Pipa GIP Medium dia 150 mm
Pipa Rising dia 80 mm
Pipa screen dia 80 mm

b Pengadaan dan pemasangan pompa shallow well, kapasitas (debit air) 150 s/d 200 Lpm, pengadaan
c dan pemasangan
Instalasi pipa konstruksi
kabel Kontrol 1 unit
WLC 1 unit
d Instalasi Pipa GIP dia 50 mm ke GWT 1 unit
e Gate Valve dia 2 1 unit
f Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm 1 unit
g Panel kontrol shallow well type outdoor 1 unit
h Pengujian kwalitas air ke laboratorium 1 unit
i Testing Comissioning & Training 1 unit
j Material & Alat Bantu 1 unit

6 Ground Water Tank 2.00 unit 6,220,886.84 0.237 -


Kapasitas 4 m3

7 Accessories Pompa Air Bersih


Gate Valve diameter 50 2.00 bh 487,088.90 0.019 -
Check Valve diameter 50 2.00 bh 1,930,205.30 0.073 -
Strainer diameter 50 2.00 bh 1,047,565.30 0.040 -
Flexible Joint diameter 50 4.00 bh 806,476.19 0.031 -
Foot Valve diameter 50 2.00 bh 1,281,464.90 0.049 -
Pressure Gauge 2.00 bh 330,019.10 0.013 -
GIP med dia. 100 ( pipa header ) 1.00 set 364,960.60 0.014 -
Instalasi pemipaan area pompa c/w fiting-fitting & support. 1.00 lot 624,778.03 0.024 -
Meteran Air c/w GV dia. 50 & Box Meteran 1.00 unit 540,131.55 0.021 -

8 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
SITE PLAN
1. Dari Box Meter PDAM ke GWT
PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) 6.00 m 290,526.75 0.011 -
2. Pemipaan R.Pompa ke Tanki Air Atas
GIP dia. 50 64.60 m 6,016,881.27 0.229 -

C.2. INSTALASI AIR KOTOR & AIR BEKAS


1 Septic Tank ( by Pekerjaan STR)
2 Resapan (By Pekerjaan STR)
3 TESTING COMMISSIONING 1.00 lot 300,000.00 0.011 -

D PENYAMBUNGAN DAYA PLN 22,440,000.00 0.85 -


Pekerjaan Pasang Baru Daya Listrik PLN 13,2 KVA (13200 VA) 13,200.00 va 22,440,000.00 0.853
BP ( Biaya penyambungan )
UJL ( Uang Jaminan Langanan )
Biaya Instalatir
Concuil
Pemasangan dan material yang dibutuhkan, seperti
( kabel, penambahan tiang, pondasi, galian & urugan kembali, dll )

E PEKERJAAN INSTALASI KABEL FEEDER 8,130,629.44 0.31 -


Kabel Distribusi Daya dari Panel Pompa - Air Bersih
NYY 4 x 4 mm2 ke LP-1 10.00 m 265,708.74 0.010 -
NYY 4 x 4 mm2 ke LP-2 10.00 m 265,708.74 0.010 -
Proteksi Kabel dengan Pipa Gip Dia 100
Pengadaan Pipa Gip Dia 100, termasuk galian dan material bantu lainya 20.00 m 7,299,211.96 0.278 -
Testing & Commissioning 1.00 lot 300,000.00 0.011 -

JUMLAH TOTAL PEKERJAAN 2,629,230,947.31 100.000 1.273

TOTAL PENCAPAIAN MINGGU INI 1.273


PROGRES RENCANA
PROGRES RENCANA (KOMULATIF)
PROGRES REALISASI
PROGRES REALISASI (KOMULATIF)
DEVIASI (+/-)
REALISASI PROGRES
JUMLAH HARGA
PROSENTASE (%)
Minggu ini s/d Minggu ini REALISASI (Rp)
Volume Bobot (%) Volume Bobot (%)

0.346 1.562 41,064,391.25 76.477


12.50 0.020 32.50 0.053 1,394,250.00 50.000
7.00 0.257 17.00 0.625 16,427,100.00 100.000
- - - - -
- - - - -
- - - - -
- - - - -
5.00 0.068 65.00 0.884 23,243,041.25 100.000
0.242 0.299 7,855,000.00 32.292
- - - - -
-
-
- - - - -
- - - - -
- - - - -
- 5.00 0.057 1,500,000.00 100.000
- - - - -
- - - - -
-
-
- - - - -
- - - - -
- - - - -
- - - - -

30.00 0.057 30.00 0.057 1,500,000.00 100.000


9.00 0.034 9.00 0.034 900,000.00 100.000
4.00 0.030 4.00 0.030 800,000.00 66.667
- - - - -
30.00 0.002 30.00 0.002 60,000.00 100.000
9.00 0.002 9.00 0.002 45,000.00 100.000
- - - - -
9.00 0.051 9.00 0.051 1,350,000.00 30.000
- - - - -
30.00 0.057 30.00 0.057 1,500,000.00 100.000
- - - - -

0.20 0.004 0.20 0.004 100,000.00 20.000


0.20 0.004 0.20 0.004 100,000.00 20.000

- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1.904
0.038 0.038 1,000,000.00 0.323
0.20 0.038 0.20 0.038 1,000,000.00 20.000
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

1.401 1.401 36,843,069.64 97.847


40.00 0.087 40.00 0.087 2,279,024.00 100.000
- - - - -
- - - - -
0.80 0.023 0.80 0.023 592,121.20 100.000

3.36 0.129 3.36 0.129 3,390,710.40 100.000


97.02 0.048 97.02 0.048 1,262,230.20 100.000
4.96 0.016 4.96 0.016 410,600.37 100.000
6.00 0.230 6.00 0.230 6,054,840.00 100.000
870.00 0.430 870.00 0.430 11,318,700.00 100.000
80.00 0.269 80.00 0.269 7,070,653.33 100.000

1.92 0.074 1.92 0.074 1,937,548.80 100.000


92.40 0.046 92.40 0.046 1,202,124.00 100.000
16.00 0.050 16.00 0.050 1,324,517.33 100.000

0.465 0.465 12,223,485.47 75.148


25.00 0.054 25.00 0.054 1,424,390.00 100.000
32.00 0.130 32.00 0.130 3,431,084.80 100.000

0.36 0.014 0.36 0.014 363,290.40 100.000


43.20 0.021 43.20 0.021 562,032.00 100.000
4.80 0.016 4.80 0.016 422,655.20 100.000

- - - - -
- - - - -
- - - - -

0.96 0.037 0.96 0.037 968,774.40 100.000


46.20 0.167 46.20 0.167 4,389,000.00 100.000
8.00 0.025 8.00 0.025 662,258.67 100.000
-
- - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
-

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - -
-

- - - -
-

- - - -
-

- - - -
-

- - - -
-

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - -
-

- - - -
-

- - - -
-

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
-

- - - -
-

- - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
-
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
-

- - - -

- - - - -
- - - - -
- - - - -

- - - - -

- - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -

- - - -
- - - - -

- - - -

- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - - -
- - - -

- - - - -

- - - -
- - - - -

- - - -

- - - - -

- - - -
- - - - -

- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -

- - - -

- - - - -

- - - - -
- - - -
- - - - -

- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -
- - - - -
- - - - -

- - - -

- - - - -

- - - - -
- - - - -
- - - - -

- - - - -

- - - - -
- - - - -
- - - - -

- - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
-
- - - -

- - - - -

- - - - -

- - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -
- - - - -
- - - - -
- - - - -

- - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

- - - - -

- - - - -

- - - - -

- - - -
- - - - -
- - - -

- - - - -
- - - - -

- - - - -
- - - - -

2.492 3.765

2.492 3.765
2.029
2.306
2.492
3.765
1.458
DAFTAR HARGA SATUAN PEKERJAAN

NO. J E N I S P E K E R J A A N SATUAN HARGA SATUAN (Rp.)

PEKERJAAN PERSIAPAN STANDART


1 Pengukuran dan Pemasangan Bouwplank M' 42,900.00
2 Direksi Keet , lengkap dengan toilet, Rg. Rapat dan Mushola M2 966,300.00
3 Gudang Kerja M2 675,111.24
4 Papan Nama Proyek Buah 774,345.00
5 Foto Proyek 3 Fase (warna) Set 300,000.00
6 Air Kerja ls 5,000,000.00
7 Listrik Kerja ls 5,161,788.38
8 Pagar Keliling Proyek, tinggi 1,8m M' 357,585.25

PEKERJAAN LANTAI
1 Pek. Pasang Homogenous Tile polish Uk. 60x60 cm M2 206,672.87
2 Pek. Pasang Keramik lantai Uk. 30x30 cm Unpolish M2 166,341.91
3 Pek. Pasang Homogenous Tile unpolish lantai keliling bangunan Uk. 60x60 cm M2 228,061.77
4 Pek. Pasang Homogenous Tile Step Nozing Tangga Uk. 10 x 60 cm M' 46,156.44
5 Pek. Waterproofing (liquid/cement base) M2 87,374.32
6 Pek. Screed + Aci Lantai Dak Torn M2 95,346.63

PEKERJAAN PASANGAN DINDING DAN PLESTERAN


1 Pek. Pasangan Dinding Bata Ringan t= 10 cm Termasuk Dinding Railling Tangga M2 143,092.40
2 Pek. Plester + Aci Mortar Dinding Exterior/dind. Terluar dan Interior/Dind. Bag. Dalam M2 77,660.00
3 Plesteran Trasram (1:2) M2 63,429.52
4 Pek. Perapihan Kolom Beton, Pelat Beton Bawah Tangga, Bordes, Canopi Jendela & Entrance M2 63,768.45
5 Pek. Kolom & Balok praktis 11/11 Openingan Kusen dan Pertemunan Dinding M1 80,729.00
6 Pek. Partisi Gypsum Rangka Metal Stud Track + Lapis Rockwool M2 204,761.09
7 Pek. Cover/Penutup Pipa Air Hujan Bagian Entrance Gypsum + Rangka Hollow Galvanis M2 186,694.51
8 Pek. Pasang Hand Railling Tangga pipa Stenlis Steel Medium dia 2,5", di Atas Dinding dan Nempel pada dinding M1 156,325.83
9 Pek. Keramik 20x25 Dinding KM/WC, R. Jemur + Dinding Dapur M2 154,797.50
10 Pek. Plint Homogenous Tile 10x60 Dinding Coridor/Selasar, R. Serbaguna, & R. Pengelola dan Unit Hunian M1 41,755.56
11 Pek. Keramik 20x20 cm Meja Dapur M2 132,951.50
12 Pek. Besi Pipa Black Steel Medium railling ramp difable dia. 3", 2" dan 1" finish cat. M1 191,974.63
13 Pek. Pasang Logo Signage PU, Baja 3mm uk 80x80,Finish Duo Doff (terpasang pada tempatnya) Ls 2,128,362.61

PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES

PEKERJAAN PLAFOND
1 Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm M2 150,305.41
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 150,898.00
3 Pek. List Plafond Gypsum 5/5 M' 17,985.00
4 Pek. Beton Expose M2 63,768.45
5 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 150,898.00

6 Pek. Penutup Plafond Drop Ceiling Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm 270,390.41
M2

PEKERJAAN PENUTUP ATAP


I ATAP
1 Pek. Atap Metal Spandeck Berpasir T=0.35 MM M2 155,589.50
2 Pek. Nok Genteng M' 65,681.00
3 Pek. Lisplang GRC Tebal 9 mm Lebar 20 cm + Cat Exterior M' 60,407.82
4 Pek. Talang Air M' 59,520.00
5 Pek. Atap Genteng Metal Berpasir T=0.35 MM + insulasi powder M2 155,589.50

PEKERJAAN UTILITAS
1 Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpasang) Buah 1,599,730.00
2 Pasang Closet Jongkok Type Standar - Toilet Umum (lengkap terpasang) Buah 296,395.00
3 Pasang Urinoir - Toilet Umum (lengkap terpasang) Buah 760,210.00
4 Pasang Partisi Urinoir - Toilet Umum (lengkap terpasang) Buah 1,196,305.00
5 Pasang Cermin - Toilet Umum (lengkap terpasang) Buah 440,000.00
6 Pasang Wastafel Meja + Kran Stainless + Aksesoris - Toilet Umum (lengkap terpasang) Buah 1,005,675.00
7 Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap terpasang) Buah 631,675.00
NO. J E N I S P E K E R J A A N SATUAN HARGA SATUAN (Rp.)

8 Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang) Buah 552,244.00
9 Pasang Kran Stainless - Unit Hunian, Toilet Umum, dan Janitor (lengkap terpasang) Buah 72,732.00
10 Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang) Buah 162,932.00
11 Pasangan Floor Drain Stainless, di Toilet Hunian, di Toilet Umum, di Ruang Cuci, di Janitor, dan di Tempat Sampah Buah 188,232.00
12 Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang) Buah 629,156.00
13 Pasangan Floor Drain Stainless - di Dak Torn (lengkap terpasang) Buah 188,232.00
14 Pasang Kran Shower Buah 325,700.00

PEKERJAAN FINISHING
PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) M2 36,389.10
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) M2 19,686.70
3 Pek. Cat Canopy M2 36,389.10
4 Pek. Cat Plafond M2 19,686.70
5 Pek. Cat List Plafond M1 1,968.67
6 Pek. Cat Epoxy 500 micron Lantai Dak M2 91,144.90

PEK. KELILING BAGIAN LUAR BANGUNAN


I PEKERJAAN KELILING BANGUNAN DAN TANAMAN
1 Pek. Tanah Subur Pasir urug t = 7 cm M3 162,800.00
2 Pek. Tanaman Rumput Gajah Mini M2 22,000.00
3 Pek. Tanaman Pucuk merah T= 25-40 cm Btg 15,400.00
4 Pek. Tanaman Pohon Mangga dia 5-10 cm T=1,5 m Btg 264,000.00
5 Pek. Tanaman Pohon Kelengkeng dia 5-10 cm T=1-1,5 m Btg 264,000.00
6 Pek. Tanaman Pohon Rambutan dia 5-10 cm T=1-1,5 m Btg 132,000.00
7 Pek. Tanaman zodia T= 25-40 cm Btg 14,000.00

PEKERJAAN PERKERASAN AKSES JALAN MASUK


1 Pek. Pasir Urug t = 7 cm di Bawah Paving M3 238,920.00
2 Pek. Paving Blok t = 8 cm (standart) M3 221,430.00
4 Pek. Kanstein uk. 8.40.20 Jalan Sekeliling Bangunan M1 99,482.00

PEKERJAAN DRAINASE KELILING BAGIAN LUAR BANG.(*)


DRAINASE LUAR/SEKELILING BANGUNAN
1 Pek. Pasangan 1/2 Bata Saluran M2 107,221.40
2 Pek. Plesteran 1:3 M2 60,793.48
3 Pek. Acian M2 35,330.63
4 Pek. Pasir Urug t = 10 cm M3 241,164.00
5 Pek. Galian Tanah Saluran M3 56,975.60
6 Lantai kerja ad. 1:3:5, t = 5 cm M3 740,151.50
7 Urugan Tanah Kembali M3 33,396.00
8 Pek. Buis Beton Setengah Lingkaran 30 cm M1 55,440.00
9 Pek. Gorong-Gorong dia. 60 cm Menuju Ke Riol Kota M1 121,440.00
10 Pek. Grill penutup saluran, besi siku 50.50.5 + plat strip M1 184,965.00
11 Pek. Pasang Rollag Bata Teras M2 220,225.50
12 Pek. Pasangan Dinding Bata 1:5 M2 107,221.40
13 Pek. Plester + Aci M2 96,124.11
14 Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan Dinding M2 87,374.32
15 Pek. Waterproofing membran bakar t= 3cm di Daerah Dak M2 223,986.13
16 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar) M2 132,951.50
NO. J E N I S P E K E R J A A N SATUAN HARGA SATUAN (Rp.)

17 Pek. Pasang Keramik Dinding 20x20 M2 154,797.50


18 Pek. Tangga Dalam 'M' GWT + Cat (model gantung lengkap terpasang) Unit 1,213,960.00
19 Pek. Tangga Luar 'M' GWT + Cat (model gantung lengkap terpasang) Unit 861,960.00
20 Pek. Penutup Mainhole Baja + Cat (terpasang) Unit 728,376.00
21 Pek. Pondasi Batu Belah, Campuran 1 PC : 4 PP M3 773,272.50
22 Pek. Pintu Besi Unit 1,309,105.39
23 Pek. Pondasi Batu Kosong M3 435,039.00

PEKERJAAN STRUKTUR
1 Pek. Beton K-300 (terpasang) M3 1,009,140.00
2 Pek. Besi Beton (terpasang) Kg 13,144.01
3 Pek 1 kg jaring kawat baja (wiremesh) Kg 13,010.00
4 Pek. Pondasi Tiang Pancang 25x25 cm M' 199,000.00
5 Pek. Urugan Tanah (didatangkan) + Pemadatan Tanah Urugan CBR 6% M3 202,664.00
6 Pek. Pasir urug diatas tanah urug t=10 cm (dalam bangunan) M3 241,164.00
7 Pek. Cor beton lantai kerja t=5 cm (dalam bangunan) M3 740,151.50
8 Pek.Besi Weremesh M-8 Kg 13,010.00
9 Pek. Bekisting Tangga M2 82,782.33
10 Pek. Bekisting Balok M2 149,900.67
11 Pek. Bekisting Plat Lantai M2 82,782.33
12 Pek. Bekisting Kolom M2 88,053.17
13 Bekisting Dinding M2 88,383.17
14 Pek. Atap Baja Ringan M2 157,674.00
15 Pek. Bekisting Pondasi/Pile Cap M' 112,856.33
16 Pek. Rollag Bata (diatas tie beam), 1 bt M2 220,225.50
17 Pek. Besi Dowel Ø 10-1000 Kg 13,144.01
18 Pek. Galian tanah M3 56,975.60
19 Pek. Urugan tanah kembali bekas galian M3 33,396.00
20 Pek. Urugan Pasir tebal 10 cm : M3 241,164.00
21 Pek. Lantai Kerja tebal 5 cm M3 740,151.50
22 Pek. Pasangan Batu kali M3 773,272.50
23 Pek. Test PDA Tiang ttk 10,000,000.00
24 Pek.pengeboran tanah D 60 cm M' 257,730.00
25 Pek. pengeboran tanah D 80 cm M' 344,630.00
26 Pek. pengeboran tanah D 100 cm M' 576,950.00
27 Pasang pipa 2,5"Baja 1kg kg 35,953.04
28 Pasang pipa 3 "Baja 1kg kg 38,698.91
29 Pasang pipa 4 "Baja 1kg kg 32,359.80
30 Pasang Baja Profil 1kg kg 32,359.80
NO. J E N I S P E K E R J A A N SATUAN HARGA SATUAN (Rp.)

31 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) kg 316.23


32 Pek. Makadam m3 266,684.00
33 Pemadatan tanah CBR 6% m3 67,100.00
34 Potong Kepala Tiang Pancang m3 55,200.00

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
DAFTAR HARGA SATUAN DASAR TENAGA KERJA, BAHAN DAN PERALATAN

NO DAFTAR HARGA BAHAN SATUAN Harga

###
HARGA UPAH
1 Mandor org/hr 120,000.00
2 Kepala tukang org/hr 110,000.00
3 Tukang gali org/hr 100,000.00
4 Tukang batu org/hr 100,000.00
5 Tukang kayu org/hr 100,000.00
6 Tukang besi org/hr 100,000.00
7 Tukang cat org/hr 100,000.00
8 Tukang listrik org/hr 100,000.00
9 Tukang pipa org/hr 100,000.00
10 Pembantu/pekerja org/hr 80,000.00
11 Pembantu operator org/hr 100,000.00
12 Juru ukur org/hr 100,000.00
13 Pembantu juru ukur org/hr 80,000.00
14 Operator org/hr 120,000.00

BAHAN KAYU
1 Kayu meranti balok 6/15 m3 1,000,000.00
2 Kayu meranti papan 3/20 m3 1,000,000.00
3 Kayu meranti usuk 5/7 m3 1,000,000.00
4 Kayu papan begesting 2/20 m3 1,000,000.00
5 Kayu kaso 5/7 pjg 3 m bekisting m3 1,000,000.00
6 Bambu bangkotan btg 14,000.00
7 Dolken kayu galam dia.10 cm, pjg 3 m btg 10,000.00
8 Kayu bakar m3 125,000.00
9 Playwood tebal 4 mm (1.2x2.4) lbr 55,000.00
10 Playwood tebal 9 mm (1.2x2.4) lbr 125,000.00
11 Triplek 4 mm (1.2x2.4) lbr 55,000.00
12 Multipleks 18 mm lbr 200,000.00

BAHAN BATU
1 Batu belah 15-20 m3 180,000.00
2 Batu pecah 5-7 cm m3 160,000.00
3 Batu pecah 3-5 cm m3 160,000.00
4 Batu pecah 2-3 cm m3 160,000.00
5 Batu pecah 1-2 cm m3 160,000.00
6 Batu kerikil beton 2-3 m3 160,000.00
7 Batu kerikil beton (BD Kerikil = 1.350 Kg/m3) Kg 148.14
8 Paving stone / Blok 8 cm m2 84,000.00
9 Paving Stone abu-abu 6 cm m2 68,000.00
10 Kansten 40x20x8 cm bh 24,000.00
11 Grass Block m2 68,000.00
12 Buis beton U 20 bh 28,000.00
13 Buis beton D 30 cm m' 32,000.00
14 Gorong-gorong D 60 cm m' 92,000.00
15 Agregat kasar m3 144,000.00
16 Agregat halus m3 160,000.00

BAHAN DINDING
1 Bata ringan uk. 60 x 20 x 10 cm bh 7,200.00
2 Bata ringan uk. 60 x 20 x 7,5 cm bh 6,000.00
3 Batu bata 5x11x22 cm bh 600.00
4 Batako 20x40x9 cm (press) m2 38,500.00
5 Kerawang press (roster) 18x18 cm bh 6,900.00
6 Kerawang (roster) 20x20 cm, beton bh 9,900.00
7 Batako kuning (putih/tras) bh 1,500.00
NO DAFTAR HARGA BAHAN SATUAN Harga

###
READY MIX
1 Beton K250 ready mix m3 840,000.00
2 Beton K300 ready mix m3 870,000.00
3 Beton K350 ready mix m3 900,000.00
4 Tiang Pancang Beton Uk. 25 x 25 cm L = 12 M K.450 m' 116,000.00
5 Tiang Pancang Beton Uk. 30 x 30 cm L = 12 M K.450 m' 226,400.00
6 Air m3 25,000.00

BAHAN SEMEN
1 Mortar siap pakai utk spesi pasangan bata kg 1,400.00
2 Semen mortar siap pakai utk acian (instan) kg 1,800.00
3 Semen kg 1,175.00
4 Semen 50 kg Zak 58,750.00
5 Semen warna kg 10,000.00

BAHAN PASIR & TANAH


1 Grosok sawur m3 120,000.00
2 Pasir beton m3 160,000.00
3 Pasir beton (BD Pasir = 1.400 Kg/m3) Kg 185.71
4 Pasir pasang m3 160,000.00
5 Pasir Urug m3 160,000.00
6 Tanah urug m3 80,000.00
7 Sirtu m3 160,000.00
8 Kerikil / Koral / Agregat Beton m3 160,000.00

BAHAN BESI & ALUMINIUM


1 Besi Beton Ulir kg 11,000.00
2 Besi beton polos kg 11,000.00
3 Kawat ikat beton kg 20,000.00
4 Besi wire mesh Std M 4 SNI kg 11,000.00
5 Besi wire mesh Std M 6 SNI kg 11,000.00
6 Besi wire mesh Std M 8 SNI kg 11,000.00
7 Besi hollow 40 X 40 X 400 mm t = 0,35 mm m' 14,000.00
8 Besi hollow 40 X 20 X 400 mm t = 0,35 mm m' 12,000.00
9 Plat Besi tebal 1.2 mm kg 14,000.00
10 Plat simpul kg 14,000.00
11 Besi profil WF kg 14,000.00
12 Besi rangka C kg 14,000.00
13 Besi L , 40.40.4 M' 36,250.00
14 Besi Strip M' 14,200.00
15 Kawat Las kg 55,000.00
16 Fiser Beton Ø 16mm-5" Bh 38,500.00
17 Baut angker Ø 19mm Bh 12,800.00
18 Baut 3/8 buah 23,000.00
19 Baut 5/8 buah 28,000.00
20 Baut 12 mm buah 2,700.00
21 Jarum keras M12 buah 15,000.00
22 Paku reng kg 15,000.00
23 Paku triplek kg 15,000.00
24 Paku 5 cm dan 7 cm kg 15,000.00
25 Paku sekrup kg 14,000.00
26 Besi Pipa Galvanis 1" m 50,000.00
27 Profil kusen Aluminium 4" m 80,000.00
28 Profil kusen Aluminium Powder coating 3" m 88,000.00
29 Profil selimar Aluminium Powder coating m 110,000.00
30 Aluminium Jalusi (Krepyak) Uk. 3" m 25,000.00
31 Aluminium Pelat 1 mm m2 140,000.00
32 Sealent dinding & kusen aluminium m 5,000.00
33 Sekrup fixer buah 750.00
34 Sealant tube 50,000.00
35 Profil kaca m 5,000.00
NO DAFTAR HARGA BAHAN SATUAN Harga

###
36 Karet kaca m 3,000.00
37 Manhole Baja Tebal 3mm, 60 x 60 Bh 550,000.00
38 Pintu besi baja m2 1,650,000.00
39 Perancah/stager m2 300,000.00
40 Penyangga jarak bekisting/spacer bh 5,000.00
41 metal uring plafond btg 38,000.00
42 Plat Track m' 12,000.00
43 Plat Stud m' 13,200.00
44 Besi GIP 3 INCI, 4 mm m' 161,666.66
45 Besi GIP 2 INCI, 3,6 mm m' 65,000.00
46 Besi GIP 1 INCI, 3,6 mm m' 50,000.00
47 Besi GIP 3/4 INCI, 3,6 mm m' 31,666.66
48 Besi Hollow 150x150 mm m' 500,000.00

BAHAN CAT
1 Cat besi/kayu setara Glotex kg 41,600.00
2 Cat meni (besi / kayu) cat pedang kg 22,000.00
3 Thinner A ltr 16,800.00
4 Thinner B ltr 20,000.00
5 Cat tembok Interior, warna Stand kg 18,400.00
6 Cat dasar interior kg 16,800.00
7 Cat tembok Exterior kg 76,800.00
8 Cat dasar exterior kg 19,040.00
9 Cat alkali (undercoat) kg 24,400.00
10 Minyak cat / Afdunner ltr 14,400.00
11 Minyak pelumas ltr 30,000.00
12 Teer ltr 3,000.00
13 Plamur Tembok Set. MATEX Kg 24,800.00
14 Plamir Kayu / Besi Kg 24,800.00
15 Lem kayu kg 23,848.00
16 Lem PVC bh 12,000.00
17 Minyak cat / thinner ltr 14,400.00
18 Dempul kg 28,640.00
19 Ampelas lbr 3,600.00
20 Kuas 2inc bh 12,800.00
21 Cat epoxy kg 56,000.00

KERAMIK
1 Keramik Dinding 20x25 polish buah 2,160.00
2 Keramik Lantai 20x20 un polish buah 1,792.00
3 Keramik Lantai 30x30 polos buah 4,145.45
4 Keramik Lantai 30x30 Unpolish buah 4,666.66
5 Keramik 30 x 60 buah 14,666.66
6 HT Lantai 60x60 polish buah 42,666.66
7 HT Lantai 60x60 unpolish buah 49,333.33
8 HT Lantai 40x40 unpolish buah 24,666.66
9 HT step nosing 10x60 unpolish cutting buah 15,200.00
10 Plint HT 10x60 polish cutting buah 12,800.00
11 Keramik Lantai 30x30 Tactile (pemandu tunanetra) buah 14,400.00
NO DAFTAR HARGA BAHAN SATUAN Harga

###
PENUTUP ATAP
1 Atap genteng metal Spandek berpasir T=0.35 MM m' 93,500.00
2 Nok Metal roof ( L = 120 cm ) bh 20,000.00
3 Genteng bh 3,040.00
4 Atap genteng metal berpasir 0,35mm lbr 128,000.00
5 Asbes gelombang besar m2 29,600.00
6 Seng Gelombang BJLS 0,25 mm x 80 cm x 180 cm m2 28,333.33
7 Spandek 0,3 mm ukr 1 x 6 m m 220,000.00
8 Seng Plat BJLS 30 l=60 Cm Lmbr 26,400.00
9 List plank GRC 2,4 x 0,2 m, t = 9 mm m' 16,000.00
10 Roof Bottom/Reng R 33-0.45 m1 4,933.33
11 Baja ringan C 75.75 m1 14,000.00
12 Alumunium foil 2sisi m2 6,000.00
13 Profil Reng baja ringan m1 6,000.00
14 Dinabolt bh 1,600.00
15 Atap Transparant m1 223,728.81
16 Nok UPVC m1 103,120.00
17 Self drilling screw dia 6 x 20 mm (truss Screw) buah 320.00
18 Pasang ijuk untk resapan kg 896.00
18 Insulasi Powder m2 6,000.00

PLAFOND ###
1 Gypsum Board uk. 1,2 x 2,4 t : 9 mm lbr 58,520.00
2 Kalsiboard 120 x 240, tebal 6 mm lbr 108,000.00
3 GRC board 120 x 240, tebal 4 mm lbr 60,000.00
4 PVC m2 150,000.00
5 List gypsum 5 cm m 6,000.00
6 List Kayu Profil 5 cm m 3,600.00
7 Joint tape rol 30,800.00
8 Kompon zak 72,000.00
9 Sekrup kalsiboard bh 32.80
10 Paku sekrup kg 11,200.00
11 Rockwall m2 24,444.44

BAHAN KUNCI, PENGGANTUNG


1 Kunci Tanam 2 Slaag bh 200,000.00
2 Engsel Pintu 4" bh 25,000.00
3 Engsel Jendela 3" bh 25,000.00
4 Hak Angin psg 50,000.00
5 Gerendel jendela bh 50,000.00
6 Gerendel atas utk pintu bh 50,000.00
7 Handle pintu set 200,000.00
8 Pengunci set 150,000.00
9 Handle + pengunci set 280,000.00
10 Daun pintu enggeering door uk.0.82x2.1 m unit 1,280,000.00
11 Daun pintu enggeering door uk.1.02x2.1 m unit 1,600,000.00
12 Daun pintu enggeering door uk.0.92x2.1 m unit 1,440,000.00
13 Daun pintu enggeering door uk.0.72x2.1 m unit 1,280,000.00
14 Daun pintu UPVC KM/WC unit 845,600.00
15 Daun pintu UPVC KM/WC (difable) unit 925,600.00
16 Daun pintu alumunium powder coating m2 400,000.00
17 Profil alluminium m1 64,000.00
18 Alluminium strip m1 3,600.00
19 Engsel Pintu Besi bh 68,000.00
20 Daun pintu engeneering door m2 952,380.95
NO DAFTAR HARGA BAHAN SATUAN Harga

###
21 Louvre aluminium (krepyak) m' 56,000.00
22 Level handle pintu baja psg 144,000.00
23 HD non panic swing bh 428,000.00
24 Door Closer bh 16,000.00
25 D. cylinder bh 100,000.00
26 Engsel/hinges pintu besi psg 73,600.00
27 Kunci lemari bh 4,000.00
28 Pasang Roof drain bh 168,000.00

BAHAN KACA
Kaca Bening 3 mm m2 68,000.00
1 Kaca Bening 5 mm m2 76,000.00
2 Kaca Bening 8 mm m2 123,200.00
2 Glass Block bh 36,000.00
3 Jendela Nako bh 32,800.00

BAHAN SAITAIR & ACCS


1 Closet Jongkok bh 128,000.00
2 Closet duduk buang belakang bh 2,800,000.00
3 Closet duduk biasa bh 1,000,000.00
4 Urinoir bh 280,000.00
5 Partisi Urinoir bh 840,000.00
6 Wastafel bh 220,000.00
7 Wastafel Meja bh 560,000.00
8 Floor drain stainless bh 30,000.00
9 Kran Air 1/2" bh 20,000.00
10 Kran Shower bh 250,000.00
11 Kran Washtafel bh 82,500.00
12 Kran Jet Washer bh 75,000.00
13 Kran Air leher angsa bh 197,600.00
14 Kitchen Zink bh 328,240.00
15 Sealtipe bh 12,800.00
16 Shower bh 226,400.00
17 Jet Washer bh 60,000.00

BAHAN LAIN-LAIN
1 Waterstop lebar 230mm - 320mm m 28,000.00
2 Waterproofing liquid Kg 45,581.20
3 Water proofing Membrane m' 125,000.00
4 Material Primer Bitumen Kg 68,000.00
5 Pipa PVC 3/4" m1 5,400.00
6 Minyak Bekisting ltr 7,200.00
7 Solar INDUSTRI ltr 6,560.00
8 Railing hollow 4/4 & 2/4 tebal 1,2mm, termasuk finishing by specialist m1 403,200.00
9 Kanstein uk. 8.40.20 sekeliling bangunan M1 21,600.00
10 Penanaman Pohon Akasia dia 5-10 cm T=2,0 m Buah 1,103,600.00
11 Buis beton setengah lingkaran 30 cm M1 32,000.00
12 Gorong-gorong dia. 60 cm menuju ke riol kota M1 92,000.00
13 Grill penutup saluran, besi siku 50.50.5 + plat strip M1 62,480.00
14 Tangga Dalam 'M' GWT + cat ( model gantung lengkap terpasang ) Unit 1,103,600.00
15 Tangga Luar 'M' GWT + cat ( model gantung lengkap terpasang ) Unit 783,600.00
NO DAFTAR HARGA BAHAN SATUAN Harga

###
16 Penutup mainhole baja (terpasang) Unit 662,160.00
17 List plafond gypsum 5/5 M1 20,160.00
18 Shower Unit 209,920.00
19 Tanah Subur Pasir urug t = 7 cm M3 148,000.00
20 Tanaman Rumput Gajah Mini M2 20,000.00
21 Tanaman Pohon Zodia T= 25-40 cm Batang 14,000.00
22 Tanaman Pohon Mangga dia 5-10 cm T=1,5 m Batang 240,000.00
23 Tanaman Pohon Kelengkeng dia 5-10 cm T=1-1,5 m Batang 240,000.00
24 Tanaman Pohon Rambutan dia 5-10 cm T=1-1,5 m Batang 120,000.00
25 Talang zincalum t= 0,35mm, L=90 cm M1 49,600.00
26 Minyak Tanah L 12,500.00
27 Air M3 25,000.00
28 Minyak Bekisting L 9,000.00
29 pengeboran tanah D 60 cm m' 208,000.00
30 pengeboran tanah D 80 cm m' 272,000.00
31 Menie Cat Besi kg 20,000.00
32 Harga Handrail Stainless Kloset, Bahan pipa 11/4 in tbl 1mm+Ukuran Lebar 80cm x tinggi 75cm Berat 3kg unit 770,000.00
33 Pipa Galvanis 4" 3,5 mm kg 14,000.00
34 CAT DUCO NIPPE 2000 - SUPER BLACK 480 1 LITER kg 28,800.00
35 sika grout 125 (25 kg) zak 78,000.00
36 sika grout 125 (1 kg) kg 3,120.00
37 Mur Baut A325 HTB Dia 12 mm bh 3,052.00
38 Pipa Galvanis 2,5" 3,5 mm kg 16,896.55
39 Pipa Galvanis 3" 3,5 mm kg 18,963.83
40 Cermin Toilet bh 440,000.00
41 Jaring Nyamauk m2 16,000.00
42 Coring Beton Untk Pipa ttk 128,000.00
43 ACRYLIC 3 MM – 4 x 8 BENING M2 421,920.00
44 Cat Ls 20,000.00
45 Lakban Kertas Ls 12,000.00
46 Pen acrylic bh 3,200.00
47 Pasang Pipa PVC dia 100 + Acsessories M1 112,000.00
48 Pasang Pipa PVC dia 50 + Acsessories M1 56,800.00
49 Pasang Pipa Vent unit 120,000.00

SEWA ALAT
1 Sewa mobil pickup hari 320,000.00
2 Sewa alat ukur theodolit hari 383,500.00
3 Sewa tripot/Tackel & handle crane 2T hari 100,000.00
4 Sewa alat bantu ls 22,100.00
5 Sewa alat bantu Jam 9,500.00
6 Sewa alat test Jam 34,000.00
7 Sewa dump truck 5 m3 Jam 85,000.00
8 Sewa dump truck 8 - 10 m3 Jam 110,000.00
9 Molen (concrete mixer 0.125 m3) sewa-hari 600,000.00
10 Molen (concrete mixer 0.35 m3) sewa-hari 250,000.00
11 Pompa dan conveyor beton Jam 250,000.00
12 Crane < 10 ton Jam 300,000.00
13 Crane > 10 ton Jam 300,000.00
14 Crane 30 ton Jam 300,000.00
15 Lift sampai dengan tinggi maksimum 12 m Jam 340,000.00
16 Alat Pancang + Hammer 2 ton Jam 100,000.00
17 Alat Penyambung Tiang Pancang Jam 100,000.00
18 Pemadat Timbunan (stamper) Jam 40,000.00
NO DAFTAR HARGA BAHAN SATUAN Harga

###
19 Tripod Jam 100,000.00
20 Sewa stamper Jam 40,000.00
21 Concrete Vibrator Jam 55,000.00
22 Cronrete pump Jam 500,000.00
23 Sewa Molen hr 200,000.00
24 Excavator Jam 600,000.00
25 Sewa Mesin las Jam 180,000.00
26 Sewa Alat Bor Tanah 60 cm Jam 180,000.00
27 Sewa Alat Bor Tanah D 80 Jam 260,000.00
28 Sewa Alat Bor Tanah D 100 Jam 440,000.00
29 Crane 35 ton Jam 550,000.00
30 Sewa Mobil Buang Lumpur Bore Pile Rit 600,000.00
31 PDA TEST PAKET 10,000,000.00

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
DAFTAR HARGA BAHAN MEKANIKAL ELEKTRIKAL

HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5

A BAHAN PIPA PPR PN-10


1 Pipa PPR PN-10 1/2" (20 mm) m Rp. 10,945.00
2 Pipa PPR PN-10 3/4" (25 mm) m Rp. 14,327.50
3 Pipa PPR PN-10 1" (32 mm) m Rp. 23,045.00
4 Pipa PPR PN-10 1,25" (40 mm) m Rp. 36,520.00
5 Pipa PPR PN-10 1,5" (50 mm) m Rp. 56,650.00
6 Pipa PPR PN-10 2" (63 mm) m Rp. 89,677.50
7 Pipa PPR PN-10 2,5" (75 mm) m Rp. 125,482.50
8 Pipa PPR PN-10 3" (90 mm) m Rp. 181,115.00
9 Pipa PPR PN-10 4" (110 mm) m Rp. 268,977.50
B BAHAN PIPA PVC AW
1 Pipa PVC AW 1/2" (15 mm) m Rp. 4,937.50
2 Pipa PVC AW 3/4" (20 mm) m Rp. 6,187.50
3 Pipa PVC AW 1" (25 mm) m Rp. 7,937.50
4 Pipa PVC AW 1,25" (32 mm) m Rp. 10,437.50
5 Pipa PVC AW 1,5" (40 mm) m Rp. 11,687.50
6 Pipa PVC AW 2" (50 mm) m Rp. 14,187.50
7 Pipa PVC AW 2,5" (65 mm) m Rp. 20,437.50
8 Pipa PVC AW 3" (80 mm) m Rp. 24,950.00
9 Pipa PVC AW 4" (100 mm) m Rp. 42,187.50
10 Pipa PVC AW 6" (150 mm) m Rp. 100,187.50
11 Pipa PVC AW 8" (200 mm) m Rp. 168,200.00
12 Pipa PVC D 1,25" (32 mm) m Rp. 6,950.00
13 Pipa PVC D 2" (50 mm) m Rp. 10,450.00
14 Pipa PVC D 3" (50 mm) m Rp. 15,187.50
15 Pipa PVC D 4" (100 mm) m Rp. 22,687.50
C BAHAN PIPA BESI BSP SCH.40
1 Pipa BSP sch. 40 1" (25 mm) m Rp. 21,920.00
2 Pipa BSP sch. 40 1,25" (32 mm) m Rp. 29,933.33
3 Pipa BSP sch. 40 1,5" (40 mm) m Rp. 35,606.66
4 Pipa BSP sch. 40 2" (50 mm) m Rp. 47,520.00
5 Pipa BSP sch. 40 2,5" (65 mm) m Rp. 78,513.33
6 Pipa BSP sch. 40 3" (80 mm) m Rp. 98,653.33
7 Pipa BSP sch. 40 4" (100 mm) m Rp. 140,286.66
8 Pipa BSP sch. 40 5" (125 mm) m Rp. 189,793.33
9 Pipa BSP sch. 40 6" (150 mm) m Rp. 245,320.00
10 Pipa sch. 40 8" (200 mm) Warna Putih m Rp. 498,000.00
11 Pipa sch. 40 6" (150 mm) Warna Putih m Rp. 314,266.66
12 Pipa sch. 40 4" (100 mm) Warna Putih m Rp. 179,666.66
13 Pipa sch. 40 3" (65 mm) Warna Putih m Rp. 126,333.33
14 Pipa sch. 40 2" (50 mm) Warna Putih m Rp. 60,800.00
D BAHAN PIPA GIP med
1 Pipa GIP Medium Class dia 100 mm2 m Rp. 132,806.66
2 Pipa GIP Medium Class dia 80 mm2 m Rp. 91,740.00
3 Pipa GIP Medium Class dia 65 mm2 m Rp. 71,033.33
4 Pipa GIP Medium Class dia 50 mm2 m Rp. 55,786.66
5 Pipa GIP Medium Class dia 40 mm2 m Rp. 40,853.33
6 Pipa GIP Medium Class dia 32 mm2 m Rp. 35,640.00
7 Pipa GIP Medium Class dia 25 mm2 m Rp. 27,413.33
8 Pipa GIP Medium Class dia 20 mm2 m Rp. 17,660.00
9 Pipa GIP Medium Class dia 15 mm2 m Rp. 13,760.00
10 Pipa Header GIP dia 100 mm2 Unit Rp. 700,000.00
11 Pipa Header GIP dia 200 mm2 Unit Rp. 1,100,000.00
E BAHAN POMPA & TOREN
1 Pompa air shallow well Bh Rp. 26,000,000.00
2 Pompa hydran diesel 500 USGPM Bh Rp. 94,000,000.00
3 Pompa jockey 25 USGPM Bh Rp. 16,800,000.00
4 Pompa transfer 80 Lpm Bh Rp. 4,672,000.00
5 Jet Pump 27 lpm - 250 W T.Head 24 m Bh Rp. 2,500,000.00
6 Jet Pump 34 lpm - 400 W T.Head 26 m model tutup Bh Rp. 6,000,000.00
7 Panel Control Pompa Bh Rp. 5,000,000.00
8 Shallow Well 150 s/d 200 lpm Set Rp. 26,000,000.00
9 Toren air 1500 Liter Bh Rp. 1,337,600.00
10 Toren air 2 m3 Bh Rp. 1,430,000.00
11 Toren air 4 m3 Bh Rp. 2,794,000.00
12 Pengeboran sumur lot Rp. 2,000,000.00
13 Resapan 3 m3 unit Rp. 1,200,000.00
14 Septic Tank 4 m3 unit Rp. 13,500,000.00
15 Septic Tank 9 m3 unit Rp. 34,000,000.00
16 Septic Tank 12 m3 unit Rp. 45,600,000.00
17 Portable Grease Trap 100 L unit Rp. 200,000.00
18 Vent Cup dia. 50 mm Bh Rp. 16,000.00
19 Vent Cup dia. 80 mm Bh Rp. 20,000.00
20 Dop dia. 150 mm Bh Rp. 28,000.00
21 Dop dia. 100 mm Bh Rp. 22,000.00
22 Dop dia. 80 mm Bh Rp. 14,000.00
F BAHAN VALVE
1 Gate valve 10K 3/4" (20 mm) Bh Rp. 58,000.00
2 Gate valve 10K 1" (25 mm) Bh Rp. 68,400.00
3 Gate valve 10K 1,25" (32 mm) Bh Rp. 91,000.00
4 Gate valve 10K 1,5" (40 mm) Bh Rp. 126,000.00
5 Gate valve 10K 2" (50 mm) Bh Rp. 206,000.00
6 Gate valve 10K 2,5" (65 mm) Bh Rp. 507,560.00
7 Gate valve 10K 3" (80 mm) Bh Rp. 860,000.00
8 Gate valve 10K 4" (100 mm) Bh Rp. 1,260,000.00
9 Gate valve 10K 6" (150 mm) Bh Rp. 2,168,000.00
10 Gate valve 16K 2" (50 mm) Bh Rp. 610,000.00
11 Gate valve 16K 4" (100 mm) Bh Rp. 1,410,000.00
12 Gate valve 16K 6" (150 mm) Bh Rp. 2,370,000.00
13 Butterfly valve 10K 6" (150 mm) Bh Rp. 1,450,000.00
14 Check valve 10K 2" (50 mm) Bh Rp. 860,000.00
15 Check valve 16K 4" (100 mm) Bh Rp. 1,224,000.00
16 Check valve 16K 6" (150 mm) Bh Rp. 1,836,000.00
17 strainer 10K 2" (50 mm) Bh Rp. 460,000.00
18 strainer 16K 4" (100 mm) Bh Rp. 1,500,000.00
19 strainer 16K 6" (150 mm) Bh Rp. 1,810,000.00
20 flexible joint 10K 2" (50 mm) Bh Rp. 168,000.00
21 flexible joint 10K 6" (150 mm) Bh Rp. 486,000.00
22 foot valve 10K 2" (50 mm) Bh Rp. 566,000.00
23 foot valve 10K 6" (150 mm) Bh Rp. 1,884,000.00
24 Roof drain 2" (50 mm) Bh Rp. 26,880.00
25 Roof drain 3" (80 mm) Bh Rp. 33,600.00
26 Roof drain 4" (100 mm) Bh Rp. 50,400.00
27 Roof drain 5" (125 mm) Bh Rp. 65,520.00
27 Floor drain 2" (50 mm) Bh Rp. 94,000.00
28 Clean out (FCO) 3" (80 mm) Bh Rp. 38,000.00
29 Clean out (FCO) 6" (150 mm) Bh Rp. 152,000.00
30 Clean out (FCO) 2" (50 mm) Bh Rp. 24,000.00
31 Clean out (FCO) 4" (100 mm) Bh Rp. 44,000.00
32 Pressure Gauge Bh Rp. 140,000.00
33 Meter air dia. 20 mm Bh Rp. 260,000.00
34 Meter air dia. 50 mm Bh Rp. 480,000.00

G PERALATAN HYDRANT
1 Indoor Hydran Box (IHB) Type B Bh Rp. 1,799,600.00
2 Outdoor Hydran Box (OHB) Type C Bh Rp. 1,513,600.00
3 Hydran pillar 2 ways (Ex. lokal) Bh Rp. 1,452,000.00
4 Siamesse connection (ex. Local) Bh Rp. 1,400,000.00
5 Fire Extinguisher Type CO2 Class B,C Kap. 4,6 kg bh Rp. 323,400.00
6 Fire Extinguisher Type Class A,B,C Kap. 3,5 kg Bh Rp. 162,800.00

H FAN
1 Exhaust Ceiling Mounted Kap. 400 Cfm Bh Rp. 740,000.00
2 Grille 200x200 mm Bh Rp. 100,000.00
3 Grille 100x100 mm Bh Rp. 72,000.00

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
DAFTAR HARGA BAHAN ELEKTRIKAL

HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5

A BAHAN ELEKTRIKAL
1 Pasang listrik /Wiring Ttk Rp. 24,240.00
2 Lampu TL 1 x 10 w Bh Rp. 16,798.00
3 Lampu TL 1 x 20 w Bh Rp. 25,664.00
4 Lampu TL 1 x 40 w Bh Rp. 34,996.40
5 Lampu pijar 25 w Bh Rp. 6,999.20
6 Lampu pijar 40 - 100 w Bh Rp. 4,030.00
7 Lampu TKI, TL 2x36 watt Bh Rp. 180,000.00
8 Lampu V-SHAPE, TL 2x36 watt Bh Rp. 176,000.00
9 Lampu TL Balk 1x18 watt Bh Rp. 100,000.00
10 Lampu TL Balk 1x18 watt + Battery Bh Rp. 280,000.00
11 Lampu TL Balk 1x36 watt Bh Rp. 116,000.00
12 Lampu Baret 32 watt + Battery Bh Rp. 271,000.00
13 Lampu Baret 32 watt Bh Rp. 91,000.00
14 Lampu LED 7 watt Bh Rp. 50,000.00
15 Lampu LED 7 watt c/w battery charger Bh Rp. 230,000.00
16 Lampu LED 9 watt Bh Rp. 56,000.00
17 Lampu LED 9 watt c/w battery charger Bh Rp. 236,000.00
18 Lampu Downlight 13 watt Bh Rp. 48,000.00
19 Lampu Downlight 18 watt Bh Rp. 60,000.00
20 Lampu Taman SL-26 watt Bh Rp. 340,000.00
21 Lampu Exit 18 watt + Battery Bh Rp. 290,000.00
22 Isolator Bh Rp. 2,545.20
23 Las Doof Bh Rp. 1,018.00
24 Fiting Plafond Bh Rp. 3,400.00
25 T dos PVC Bh Rp. 1,866.40
26 Stop Kontak Wall Type Bh Rp. 15,250.00
27 Stop Kontak Floor Type Bh Rp. 170,000.00
28 Stop Kontak-AC Bh Rp. 26,000.00
29 Stop Kontak-TV Bh Rp. 25,210.00
30 Stop Kontak-TELEPON Bh Rp. 16,726.00
31 Saklar tunggal Bh Rp. 10,800.00
32 Sakla ganda Bh Rp. 18,000.00
33 Saklar Hotel 1 gang Bh Rp. 18,880.00
34 Saklar Hotel 2 gang Bh Rp. 28,000.00
35 Kabel NYA 1000 Volt 1,5 mm M1 Rp. 1,135.20
36 Kabel NYA 1000 Volt 2x1,5 mm M1 Rp. 2,270.40
37 Kabel NYA 1000 Volt 3x1,5 mm M1 Rp. 6,811.20
38 Kabel NYA 1000 Volt 2,5 mm M1 Rp. 1,796.80
39 Kabel NYA 1000 Volt 2x2,5 mm M1 Rp. 3,593.60
40 Kabel NYA 1000 Volt 4 mm M1 Rp. 2,858.80
41 Kabel NYA 1000 Volt 6 mm M1 Rp. 4,279.60
42 Kabel NYA 1000 Volt 10 mm M1 Rp. 7,160.00
43 Kabel NYA 1000 Volt 16 mm M1 Rp. 10,600.00
44 Kabel NYA 1000 Volt 25 mm M1 Rp. 16,960.00
45 Kabel NYA 1000 Volt 35 mm M1 Rp. 23,320.00
46 Kabel NYA 1000 Volt 50 mm M1 Rp. 32,680.00
47 Kabel NYA 1000 Volt 70 mm M1 Rp. 45,800.00
48 Kabel NYA 1000 Volt 95 mm M1 Rp. 61,480.00
49 Kabel NYA 1000 Volt 120 mm M1 Rp. 78,040.00
50 Kabel NYA 1000 Volt 150 mm M1 Rp. 94,560.00
51 Kabel NYA 1000 Volt 185 mm M1 Rp. 119,600.00
52 Kabel NYM 300/750 Volt 3x2,5 mm2 M1 Rp. 5,701.60
53 Kabel NYM 300/750 Volt 3x4 mm2 M2 Rp. 7,700.00
54 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 Rp. 7,840.00
55 Kabel NYY 0,6/1 Kv 4x2,5 mm2 M1 Rp. 9,216.00
56 Kabel NYY 0,6/1 Kv 4x4 mm2 M1 Rp. 13,889.20
57 Kabel NYY 0,6/1 Kv 4x6 mm2 M1 Rp. 19,353.60
58 Kabel NYY 0,6/1 Kv 4x10 mm2 M1 Rp. 26,800.00
59 Kabel NYY 0,6/1 Kv 4x16 mm2 M1 Rp. 47,080.00
60 Kabel NYY 0,6/1 Kv 4x25 mm2 M1 Rp. 72,080.00
61 Kabel NYY 0,6/1 Kv 4x35 mm2 M1 Rp. 97,960.00
62 Kabel NYY 0,6/1 Kv 4x50 mm2 M1 Rp. 133,160.00
63 Kabel NYY 0,6/1 Kv 4x70 mm2 M1 Rp. 188,280.00
64 Kabel NYY 0,6/1 Kv 4x95 mm2 M1 Rp. 258,640.00
65 Kabel NYY 0,6/1 Kv 4x120 mm2 M1 Rp. 323,960.00
66 Kabel NYY 0,6/1 Kv 4x150 mm2 M1 Rp. 398,560.00
67 Kabel NYY 0,6/1 Kv 4x185 mm2 M1 Rp. 495,680.00
68 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 Rp. 648,720.00
69 Kabel NYY 0,6/1 Kv 4x300 mm2 M1 Rp. 806,880.00
70 Kabel NYFGBY 0,6/1 Kv 3x2,5 mm2 M1 Rp. 10,042.00
71 Kabel NYFGBY 0,6/1 Kv 4x16 mm2 M1 Rp. 57,800.00
72 Kabel NYFGBY 0,6/1 Kv 4x240 mm2 M1 Rp. 513,400.00
73 Kabel FRC 0,6/1 Kv 3x2,5 mm2 M1 Rp. 33,960.00
74 Kabel FRC 0,6/1 Kv 4Cx4 mm2 M1 Rp. 60,300.00
75 Kabel FRC 0,6/1 Kv 4Cx6 mm2 M1 Rp. 80,174.00
76 Kabel Coaxial 7C-2V M1 Rp. 6,363.20
77 Kabel Coaxial 5C-2V M1 Rp. 4,242.00
78 Kabel ITC 4x0,6 mm2 M1 Rp. 2,240.00
79 Pipa Konduit HI dia.20 mm M1 Rp. 1,600.00
80 Tray W=200 mm M1 Rp. 93,000.00
81 TEE W=200 mm M1 Rp. 128,200.00
82 Elbow W=200 mm M1 Rp. 119,120.00
83 Heat detector BH Rp. 100,000.00
84 Smoke detector BH Rp. 154,000.00
85 Manual push button BH Rp. 84,000.00
86 Bell alarm BH Rp. 158,800.00
87 Lampu indikator BH Rp. 74,000.00
88 MCFA-10 Zone BH Rp. 3,308,000.00
89 terminal Fire alarm BH Rp. 132,000.00
90 Terminal -TV BH Rp. 100,140.00
91 Antena UHF,10 element BH Rp. 271,488.00
92 Antena VHF,10 element BH Rp. 312,635.60
93 Master Amplifier BH Rp. 187,496.40
94 Arester Lightning Protection R=50 M BH Rp. 2,600,000.00
95 Sekrering Tunggal "LN" biasa Bh Rp. 22,886.80
96 Sekering ganda "LN" biasa Bh Rp. 25,029.60
97 Sekering 1 group + MCB Unit Rp. 33,851.20
98 Sekering 2 group + MCB Unit Rp. 48,358.80
99 Sekering 3 group + MCB Unit Rp. 68,720.40
100 Kwh/1phase Digital Unit Rp. 310,000.00
101 Kwh/3 phase/63 A Digital Unit Rp. 600,000.00
102 MCB,1ph/6/10/16/25 amper Unit Rp. 20,158.00
103 Box panel Hanger Unit Rp. 36,269.20
104 Splitzen T=1 mtr Unit Rp. 140,000.00
105 Grounding box 40x40x40cm Unit Rp. 180,000.00
106 Grounding Rod,1" Unit Rp. 260,000.00
107 Termination ls Rp. 300,000.00
108 BC 50 mm2 M1 Rp. 49,020.00
109 Genset 25 kva Silent type Unit Rp. 43,151,644.00
110 Box Telepon Unit Rp. 167,559.20
111 Jelly armoured 10x2x0,6 mm M1 Rp. 7,846.40
112 Splitter 6 port bh Rp. 49,934.40
113 MDF-FA ( 10 zone ) bh Rp. 550,000.00
114 Kabel NYA 1000 Volt 6x1,5 mm M1 Rp. 3,818.00
115 Kabel NYA 1000 Volt 20x1,5 mm M1 Rp. 29,237.20
116 Pipa Konduit HI dia.32 mm M1 Rp. 4,848.00
117 Pipa Konduit HI 2 x dia.32 mm M1 Rp. 6,787.20
118 MCCB,3P, 300 A bh Rp. 1,581,256.00
119 Box Panel bh Rp. 407,289.60
120 Cu bar ex,japan unit Rp. 208,060.00
121 Tray W=400 mm M1 Rp. 155,520.00
122 TEE W=400 mm bh Rp. 145,280.00
123 Elbow W=400 mm bh Rp. 136,540.00
124 Reduser W=400 mm bh Rp. 147,827.60
125 Tray W=900 mm M1 Rp. 162,702.80
126 Tray W=600 mm M1 Rp. 179,040.00
127 Lampu HPI-T 250 W NR 921 Bh Rp. 1,436,637.20
128 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 Rp. 4,772.00
129 Dome Camera P/T/Z WV - CS 570 unit Rp. 4,577,200.00
130 Hard disk Recording 16 Ch (Kap 3 tera) unit Rp. 18,725,600.00
131 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 Rp. 381,780.00
132 Pipa Gip dia.65 mm M1 Rp. 140,000.00
133 Ladder W=200 mm M1 Rp. 89,200.00
134 Ladder TEE W=200 mm M1 Rp. 103,600.00
135 Testing & Commissioning ls Rp. 1,000,000.00
136 Biaya pasang baru daya listrik PLN va Rp. 680.00
137 Tiang Lampu T=1,5 mtr bh Rp. 200,000.00
138 Tiang Lampu T=2,5 mtr bh Rp. 300,000.00
139 Panel MDP bh Rp. 13,700,000.00
140 Panel DB Pengelola bh Rp. 4,019,040.00
141 PP-Unit lt 1 bh Rp. 5,000,000.00
142 PP-Unit lt 2,3,4 bh Rp. 5,000,000.00
143 Panel Kebakaran bh Rp. 6,302,560.00
144 Panel Pompa Air Bersih bh Rp. 4,145,280.00
145 Panel Unit bh Rp. 199,920.00

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
DAFTAR UPAH ELEKTRIKAL

NO. URAIAN TENAGA SATUAN UPAH PERHARI

1 KEPALA TUKANG LISTRIK Org / hr Rp. 110,000.00


2 TUKANG LISTRIK Org / hr Rp. 100,000.00
3 PEMBANTU TUKANG LISTRIK Org / hr Rp. 80,000.00
4 MANDOR Org / hr Rp. 120,000.00

Jakarta, 17 Juni 2022


CV. ROY HALIM UTAMA

JERLY HUTAGALUNG
Direktur
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pembuatan 1 m Pagar sementara dari seng gelombang tinggi 2 m
Acuan : modifikasi
No Uraian Kegiatan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Doke kayu dia 8-10 panjang 4 m Btg 1.2500 10,000.00 12,500.00
2 Semen kg 2.5000 1,175.00 2,937.50
3 Spandek m 1.0000 220,000.00 220,000.00
4 Pasir beton m3 0.0050 160,000.00 800.00
5 Koral beton m3 0.0090 160,000.00 1,440.00
6 Kayu Balok 5/7 m3 0.0360 1,000,000.00 36,000.00 konsinyasi 19 Okt 018
7 Paku 2"-5" kg 0.0600 15,000.00 900.00
8 Meni besi ltr 0.4500 22,000.00 9,900.00
UPAH
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang Kayu OH 0.2000 100,000.00 20,000.00 konsinyasi 19 Okt 018
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0200 120,000.00 2,400.00
Harga Satuan Pekerjaan 325,077.50
Overhead & profit 10% 32,507.75
Dibulatkan 357,585.25
Jenis Pekerjaan : Pengukuran dan Pemasangan Bouwplank m'
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
No Uraian Kegiatan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Kayu Balok 5/7 m3 0.0120 1,000,000.00 12,000.00
2 Paku 2"-3" kg 0.0200 15,000.00 300.00
3 Kayu Papan 2/20 m3 0.0070 1,000,000.00 7,000.00 ###
UPAH
1 Pekerja OH 0.1000 80,000.00 8,000.00
2 Tukang Kayu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0050 120,000.00 600.00 ###
Harga Satuan Pekerjaan 39,000.00
Overhead & profit 10% 3,900.00
Dibulatkan 42,900.00
(K3) Pembuatan 1 m2 gudang semen dan peralatan
No Uraian Kegiatan Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 80,000 80,000.00
Tukang Kayu L.02.04 OH 2.0000 100,000 200,000.00
Kepala Tukang L.03.01 OH 0.2000 110,000 22,000.00
Mandor L.04.01 OH 0.0500 120,000 6,000.00
JUMLAH TENAGA KERJA 308,000.00
B BAHAN -
Dolken kayu Ø 8-10/400 cm Batang 1.7000 10,000 17,000.00
Kayu m3 0.2100 1,000,000 210,000.00
Paku biasa Kg 0.3000 15,000 4,500.00
Semen portland Kg 10.5000 1,175 12,337.50
Pasir beton m3 0.0300 160,000 4,800.00
Koral beton m3 0.0500 160,000 8,000.00
Seng gelombang Lbr 1.5000 28,333 42,500.00
Seng plat Lbr 0.2500 26,400 6,600.00
JUMLAH HARGA BAHAN 305,737.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 613,737.50
E Overhead & Profit 10% 10% 61,373.75
F Harga Satuan Pekerjaan (D+E) 675,111.24
Jenis Pekerjaan : Pembersihan dan Perataan Lapangan m2
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.2.2.19

No Uraian Kegiatan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 0.1000 80,000 8,000
4 Mandor OH 0.0500 120,000 6,000
Harga Satuan Pekerjaan 14,000
Overhead & profit 10% 1,400.00
Dibulatkan 15,400.00
Jenis Pekerjaan : Galian Tanah Biasa 1 meter m3
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 0.5630 80,000 45,040
2 Mandor OH 0.0563 120,000 6,756

Harga Satuan Pekerjaan 51,796


Overhead & profit 10% 5,179.60
Dibulatkan 56,975.60
Jenis Pekerjaan : Galian Tanah Biasa 2 meter m3
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Kegiatan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 0.6750 80,000 54,000
2 Mandor OH 0.0675 120,000 8,100

Harga Satuan Pekerjaan 62,100


Overhead & profit 10% 6,210.00
Dibulatkan 68,310.00
Jenis Pekerjaan : Galian Tanah Keras 1 meter m3
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 1.2500 80,000 100,000
2 Mandor OH 0.1250 120,000 15,000

Harga Satuan Pekerjaan 115,000


Overhead & profit 10% 11,500.00
Dibulatkan 126,500.00
Jenis Pekerjaan : Galian Tanah cadas 1 meter m3
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 1.2500 80,000.00 100,000.00
2 Mandor OH 0.1250 120,000.00 15,000.00

Harga Satuan Pekerjaan 115,000.00


Overhead & profit 10% 11,500.00
Dibulatkan 126,500.00
Jenis Pekerjaan : Galian Tanah dengan menggunakan alat m3
Acuan : HSPK Surabaya 2013

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
SEWA PERALATAN
1 Sewa Dump Truck 5 T (min 5 jam) Jam 0.0670 85,000.00 5,695.00
2 Sewa Escavator 6 m3 Jam 0.0670 600,000.00 40,200.00
UPAH
1 Operator excavator OH 0.0176 120,000.00 2,112.00
2 Pekerja OH 0.2260 80,000.00 18,080.00
3 Mandor OH 0.0070 120,000.00 840.00

Harga Satuan Pekerjaan 66,927.00


Overhead & profit 10% 6,692.70
Dibulatkan 73,619.70
Jenis Pekerjaan : Pengerjakan Stripping Tebing 1 meter
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya m2

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 0.0500 80,000.00 4,000.00
2 Mandor OH 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 4,600.00


Overhead & profit 10% 460.00
Dibulatkan 5,060.00
Jenis Pekerjaan : Pembuangan Tanah sejauh 30 meter m3
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 0.3300 80,000.00 26,400.00
2 Mandor OH 0.0100 120,000.00 1,200.00

Harga Satuan Pekerjaan 27,600.00


Overhead & profit 10% 2,760.00
Dibulatkan 30,360.00
Jenis Pekerjaan : Pengurugan Kembali 1 m3 Galian Tanah
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 0.5000 80,000.00 40,000.00
2 Mandor OH 0.0500 120,000.00 6,000.00

Harga Satuan Pekerjaan 46,000.00


Overhead & profit 10% 4,600.00
Dibulatkan 50,600.00
Jenis Pekerjaan : Pemadatan Tanah 1 m3 (per 20 cm) m3
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
UPAH
1 Pekerja OH 0.5000 80,000.00 40,000.00
2 Mandor OH 0.0500 120,000.00 6,000.00
Harga Satuan Pekerjaan 46,000.00
Overhead & profit 10% 4,600.00
Dibulatkan 50,600.00
Jenis Pekerjaan : Pengurugan 1 m3 dengan Pasir Urug
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Pasir Urug m3 1.2000 160,000.00 192,000.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 217,200.00
Overhead & profit 10% 21,720.00
Dibulatkan 238,920.00
Jenis Pekerjaan : Pengurugan 1 m3 Kerikil
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Kerikil m3 1.2000 160,000.00 192,000.00
UPAH
1 Pekerja OH 0.2500 80,000.00 20,000.00
2 Mandor OH 0.0250 120,000.00 3,000.00
Harga Satuan Pekerjaan 215,000.00
Overhead & profit 10% 21,500.00
Dibulatkan 236,500.00
Jenis Pekerjaan : Memasang Pondasi Batu Belah, Campuran 1 PC : 4 PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Batu Belah 15cm / 20 cm m3 1.2000 180,000.00 216,000.00
2 Semen PC Kg 163.0000 1,175.00 191,525.00
3 Pasir Pasang m3 0.5200 160,000.00 83,200.00
UPAH
1 Pekerja OH 1.5000 80,000.00 120,000.00
2 Tukang Batu OH 0.7500 100,000.00 75,000.00
3 Kepala Tukang OH 0.0750 110,000.00 8,250.00
4 Mandor OH 0.0750 120,000.00 9,000.00
Harga Satuan Pekerjaan 702,975.00
Overhead & profit 10% 70,297.50
Dibulatkan 773,272.50
Jenis Pekerjaan : Pemasangan 1m3 Batu Kosong ( Aanstamping )
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Batu Belah 15cm / 20 cm m3 1.2000 180,000.00 216,000.00
2 Pasir Urug m3 0.4320 160,000.00 69,120.00
UPAH
1 Pekerja OH 0.7800 80,000.00 62,400.00
2 Tukang Batu OH 0.3900 100,000.00 39,000.00
3 Kepala Tukang OH 0.0390 110,000.00 4,290.00
4 Mandor OH 0.0390 120,000.00 4,680.00
Harga Satuan Pekerjaan 395,490.00
Overhead & profit 10% 39,549.00
Dibulatkan 435,039.00
Jenis Pekerjaan : Memasang 1m2 dinding bata ringan tebal 7.5 cm dengan mortar siap pakai
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.1.25

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Bata ringan tebal 7.5 cm bh 8.4000 6,000.00 50,400.00
2 Mortar siap pakai Kg 0.4500 1,400.00 630.00
UPAH
1 Pekerja OH 0.6710 80,000.00 53,680.00
2 Tukang Batu OH 0.1300 100,000.00 13,000.00
3 Kepala Tukang OH 0.0130 110,000.00 1,430.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 119,500.00
Overhead & profit 10% 11,950.00
Dibulatkan 131,450.00
Jenis Pekerjaan : Memasang 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Acuan : Modifikasi/ Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.1.26

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Bata ringan tebal 10 cm bh 8.4000 7,200.00 60,480.00
2 Mortar siap pakai Kg 0.6300 1,800.00 1,134.00
UPAH
1 Pekerja OH 0.6710 80,000.00 53,680.00
2 Tukang Batu OH 0.1300 100,000.00 13,000.00
3 Kepala Tukang OH 0.0130 110,000.00 1,430.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 130,084.00
Overhead & profit 10% 13,008.40
Dibulatkan 143,092.40
Jenis Pekerjaan : Memasang 1m2 dinding bata merah tebal 1/2 bata camp 1PC : 5PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Bata Merah Buah 70.0000 600.00 42,000.00
2 PC Kg 9.6800 1,175.00 11,374.00
3 PP m3 0.0450 160,000.00 7,200.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 97,474.00
Overhead & profit 10% 9,747.40
Dibulatkan 107,221.40
Jenis Pekerjaan : Memasang 1m2 dinding bata merah tebal 1/2 bata camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Bata Merah Buah 70.0000 600.00 42,000.00
2 PC Kg 14.3700 1,175.00 16,884.75
3 PP m3 0.0400 160,000.00 6,400.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 102,184.75
Overhead & profit 10% 10,218.48
Dibulatkan 112,403.23
Jenis Pekerjaan : Memasang 1m2 dinding bata merah tebal 1 bata camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Bata Merah Buah 140.0000 600.00 84,000.00
2 PC Kg 22.2000 1,175.00 26,085.00
3 PP m3 0.1020 160,000.00 16,320.00
UPAH
1 Pekerja OH 0.6000 80,000.00 48,000.00
2 Tukang Batu OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0300 120,000.00 3,600.00
Harga Satuan Pekerjaan 200,205.00
Overhead & profit 10% 20,020.50
Dibulatkan 220,225.50
Jenis Pekerjaan : Pemasangan 1 m2 Dinding Terawang (Rooster) 18x18 camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan A.4.4.1.22

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Bata Roster Buah 30.0000 6,900.00 207,000.00
2 PC Kg 11.0000 1,175.00 12,925.00
3 PP m3 0.0350 160,000.00 5,600.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 262,425.00
Overhead & profit 10% 26,242.50
Dibulatkan 288,667.50
Jenis Pekerjaan : Pemasangan 1 m2 batu alam camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan A.4.4.1.22
No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Batu Alam m2 1.0000 150,000.00 150,000.00
2 PC Kg 11.0000 1,175.00 12,925.00
3 PP m3 0.0350 160,000.00 5,600.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 205,425.00
Overhead & profit 10% 20,542.50
Dibulatkan 225,967.50
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran 1 PC : 5 PP, Tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Semen PC Kg 5.1840 1,175.00 6,091.20
2 Pasir Pasang m3 0.0260 160,000.00 4,160.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 52,701.20
Overhead & profit 10% 57,971.32
Asumsi 30% yg dirapihkan 5,797.13
Dibulatkan 63,768.45
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran 1 PC : 3 PP, Tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.2.3

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Semen PC Kg 7.7760 1,175.00 9,136.80
2 Pasir Pasang m3 0.0230 160,000.00 3,680.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 55,266.80
Overhead & profit 10% 5,526.68
Dibulatkan 60,793.48 plester
Jenis Pekerjaan : Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Semen PC Kg 5.1840 1,175.00 6,091.20
2 Pasir m3 0.0260 160,000.00 4,160.00
UPAH
1 Pekerja OH 0.1500 80,000.00 12,000.00
2 Tukang Batu OH 0.0750 100,000.00 7,500.00
3 Kepala Tukang OH 0.0080 110,000.00 880.00
4 Mandor OH 0.0080 120,000.00 960.00
Harga Satuan Pekerjaan 31,591.20
Overhead & profit 10% 3,159.12
Dibulatkan 34,750.32
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.2.2

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Semen PC Kg 10.2240 1,175.00 12,013.20
2 Pasir m3 0.0200 160,000.00 3,200.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 57,663.20
Overhead & profit 10% 5,766.32
Dibulatkan 63,429.52
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran dengan mortar siap pakai (MSP)
Acuan : pemndekatan

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah


tambahan Analisa
1 2 3 4 5 6
BAHAN
1 Plesteran Mortar ( MU - 200 ) Kg 9.5000 1,800.00 17,100.00
UPAH
1 Pekerja OH 0.1300 80,000.00 10,400.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0070 120,000.00 840.00
Harga Satuan Pekerjaan 39,440.00
Overhead & profit 10% 3,944.00
Dibulatkan 43,384.00 plesteran
Jenis Pekerjaan : Pemasangan 1 m2 Acian dengan mortar siap pakai (MSP)
Acuan : pendekatan

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Plesteran Mortar ( MU - 200 ) Kg 4.9000 1,800.00 8,820.00
UPAH
1 Pekerja OH 0.1300 80,000.00 10,400.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0070 120,000.00 840.00
Harga Satuan Pekerjaan 31,160.00
Overhead & profit 10% 3,116.00
Dibulatkan 34,276.00 acian
Jenis Pekerjaan : Pemasangan 1 m2 acian
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.2.27

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Semen PC Kg 3.2500 1,175.00 3,818.75
UPAH
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 32,118.75
Overhead & profit 10% 3,211.88
Dibulatkan 35,330.63
Jenis Pekerjaan : Pemasangan 1 m' Benangan
Acuan : Pendekatan

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Semen PC Kg 0.5000 1,175.00 587.50
2 Pasir pasang m3 0.0130 160,000.00 2,080.00
UPAH
1 Pekerja OH 0.0800 80,000.00 6,400.00
2 Tukang Batu OH 0.0400 100,000.00 4,000.00
3 Kepala Tukang OH 0.0400 110,000.00 4,400.00
4 Mandor OH 0.0040 120,000.00 480.00
Harga Satuan Pekerjaan 17,947.50
Overhead & profit 10% 1,794.75
Dibulatkan 19,742.25
Jenis Pekerjaan : Membuat 1 m' Kolom praktis 11x11
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.1.1.35

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Kayu klas III m3 0.0020 1,000,000.00 2,000.00
Paku 5-12 cm kg 0.0100 15,000.00 150.00
Besi beton polos kg 3.0000 11,000.00 33,000.00
Kawat beton kg 0.4500 20,000.00 9,000.00
Semen Portland kg 4.0000 1,175.00 4,700.00
Pasir beton m3 0.0060 160,000.00 960.00
Kerikil m3 0.0090 160,000.00 1,440.00

UPAH
1 Pekerja OH 0.1800 80,000.00 14,400.00
2 Tukang Batu OH 0.0200 100,000.00 2,000.00
3 Tukang kayu OH 0.0200 100,000.00 2,000.00
4 Tukang besi OH 0.0200 100,000.00 2,000.00
5 Kepala Tukang OH 0.0060 110,000.00 660.00
6 Mandor OH 0.0090 120,000.00 1,080.00
Harga Satuan Pekerjaan 73,390.00
Overhead & profit 10% 7,339.00
Dibulatkan 80,729.00
Jenis Pekerjaan : Membuat 1 m2 Bongkar Bekisting
Acuan :

No Uraia Pekerjaan Satuan Indeks Harga Satuan Jumlah

UPAH
1 Pekerja oh 0.2000 80,000.00 16,000.00
4 Mandor oh 0.0200 120,000.00 2,400.00
Harga Satuan Pekerjaan 18,400.00
Overhead & profit 10% 1,840.00
Dibulatkan 20,240.00

Jenis Pekerjaan : (100 KG) PABRIKASI DAN PEMASANGAN BAJA


Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraia Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
SEWA PERLATAN
1 Sewa welding set ( min 5 jam ) jam 0.8000 180,000.00 144,000.00
BAHAN
1 Solar ltr 1.0000 6,560.00 6,560.00
2 Minyak pelumas ltr 0.1000 30,000.00 3,000.00
UPAH
1 Pekerja oh 0.1000 80,000.00 8,000.00
2 Mandor oh 0.0050 120,000.00 600.00
3 Kepala tukang oh 0.0010 110,000.00 110.00
4 Tukang besi oh 0.1000 100,000.00 10,000.00
Harga Satuan Pekerjaan 172,270.00
Overhead & profit 10% 189,497.00
Dibulatkan 18,949.70
1Kg Fabrikasi 208,446.70
Jenis Pekerjaan : Pemasangan 1 kg besi profil WF
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraia Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Baja WF kg 1.1500 14,000.00 16,100.00
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang las konstruksi oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 27,920.00
Overhead & profit 10% 2,792.00
Dibulatkan 30,712.00
Jenis Pekerjaan : Pemasangan 1 kg besi profil canal
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan)

No Uraia Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Baja C kg 1.1500 14,000.00 16,100.00
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang las konstruksi oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 27,920.00
Overhead & profit 10% 2,792.00
Dibulatkan 30,712.00
Jenis Pekerjaan : Pemasangan 1 kg besi profil siku
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan)

No Uraia Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Baja Siku kg 1.1500 36,250.00 41,687.50
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang las konstruksi oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 53,507.50
Overhead & profit 10% 5,350.75
Dibulatkan 58,858.25
Jenis Pekerjaan : (1KG) BESI PLAT
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan)

No Uraia Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Baja Plat kg 1.1000 14,000.00 15,400.00
2 Kawat las kg 0.0200 55,000.00 1,100.00
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 28,320.00
Overhead & profit 10% 2,832.00
Dibulatkan 31,152.00
Jenis Pekerjaan : Pengecatan Epoxi (2 lapis cat)
Acuan :

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Cat Epoxy Kg 1.0000 56,000.00 56,000.00
UPAH
1 Pekerja OH 0.0600 80,000.00 4,800.00
2 Tukang Cat OH 0.1890 100,000.00 18,900.00
3 Kepala Tukang OH 0.0189 110,000.00 2,079.00
4 Mandor OH 0.0090 120,000.00 1,080.00
Harga Satuan Pekerjaan 82,859.00
Overhead & profit 10% 8,285.90
Dibulatkan 91,144.90
Jenis Pekerjaan : Pengecatan Tembok Baru (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.1.10

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Plamir tembok Ltr 0.1000 24,800.00 2,480.00
2 Cat Dasar Kg 0.1000 16,800.00 1,680.00
3 Cat Penutup 2x Kg 0.2600 18,400.00 4,784.00
UPAH
1 Pekerja OH 0.0200 80,000.00 1,600.00
2 Tukang Cat OH 0.0630 100,000.00 6,300.00
3 Kepala Tukang OH 0.0063 110,000.00 693.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 17,897.00
Overhead & profit 10% 1,789.70
Dibulatkan 19,686.70
Jenis Pekerjaan : Pengecatan Tembok Baru (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.1.10

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Plamir tembok Ltr 0.1000 24,800.00 2,480.00
2 Cat Dasar exterior Kg 0.1000 16,800.00 1,680.00
3 Cat Penutup 2x exterior Kg 0.2600 76,800.00 19,968.00
UPAH
1 Pekerja OH 0.0200 80,000.00 1,600.00
2 Tukang Cat OH 0.0630 100,000.00 6,300.00
3 Kepala Tukang OH 0.0063 110,000.00 693.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 33,081.00
Overhead & profit 10% 3,308.10
Dibulatkan 36,389.10
Satuan : Pengecatan Permukaan Baja lapis seng secara manual 3 lapis cat konvensional (M2)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Kebutuhan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Cat Dasar Kg 0.1100 22,000.00 2,420.00
2 Cat Antara Kg 0.1700 41,600.00 7,072.00
3 Cat Penutup 2 kali Kg 0.1600 41,600.00 6,656.00
UPAH
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang Batu OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0025 120,000.00 300.00
Harga Satuan Pekerjaan 23,608.00
Overhead & profit 10% 2,360.80
Dibulatkan 25,968.80
Satuan : Pengecatan Permukaan Baja lapis seng secara manual 3 lapis cat konvensional (M2)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Manie besi Kg 0.1100 22,000.00 2,420.00
2 Manie antara Kg 0.1700 22,000.00 3,740.00
3 Manie Penutup Kg 0.0800 22,000.00 1,760.00
4 Kuas buah 0.0100 12,800.00 128.00
5 Pengencer liter 0.0100 20,000.00 200.00

UPAH
1 Pekerja OH 0.0200 80,000.00 1,600.00
2 Tukang Batu OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 32,408.00
Overhead & profit 10% 3,240.80
Dibulatkan 35,648.80
Satuan : Pengecatan bidang kayu baru 1lapis plamir, 1lapis cat dasar, 2lapis cat penutup (M2)
Acuan : HSPK No. 007 th 2005; Hal. 109

No Kebutuhan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Plamir Kg 0.1500 24,800.00 3,720.00
2 Cat Dasar Kg 0.1700 41,600.00 7,072.00
3 Cat penutup 2 kali Kg 0.2600 41,600.00 10,816.00
4 Cat meni Kg 0.2000 22,000.00 4,400.00
UPAH
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang Batu OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0025 120,000.00 300.00
Harga Satuan Pekerjaan 33,468.00
Overhead & profit 10% 3,346.80
Dibulatkan 36,814.80
Satuan : Pengecatan Waterproofing 2lapis (M2)
Acuan : Pendekatan
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Waterproofing 3 kali Kg 0.5800 45,581.20 26,437.10
UPAH
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang Batu OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0025 120,000.00 300.00
Harga Satuan Pekerjaan 33,897.10
Overhead & profit 10% 3,389.71
Dibulatkan 37,286.81
Satuan : screed 3 cm (M2)
Acuan : Pendekatan
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN

1 Pasir m3 0.0390 160,000.00 6,240.00


2 PC kg 14.4000 1,175.00 16,920.00
UPAH
1 Pekerja OH 0.1000 80,000.00 8,000.00
2 Tukang Batu OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 54,560.00
Overhead & profit 10% 5,456.00
Dibulatkan 60,016.00
Satuan : Waterproofing liquid (M2) ex. Sika
Acuan : Pendekatan
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Waterprofing Kg 1.0000 45,581.20 45,581.20
UPAH
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang Batu OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 79,431.20
Overhead & profit 10% 7,943.12
Dibulatkan 87,374.32
Satuan : Waterproofing Membran (M2)
Acuan : Pendekatan
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Waterprofing m2 1.0000 125,000.00 125,000.00
2 Alat bantu ls 1.0000 18,750.00 18,750.00
UPAH
1 Pekerja OH 0.1150 80,000.00 9,200.00
2 Mandor OH 0.0100 120,000.00 1,200.00 ###
Harga Satuan Pekerjaan 154,150.00
Overhead & profit 10% 15,415.00
Dibulatkan 169,565.00
Jenis Pekerjaan : Pemasangan 1 m Kusen aluminium
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.2.1.11

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Profil aluminium m 1.1000 88,000.00 96,800.00
2 Sekrup fixer bh 2.0000 750.00 1,500.00
3 Sealent tube 0.0600 50,000.00 3,000.00
UPAH
1 Pekerja OH 0.0430 80,000.00 3,440.00
2 Tukang khusus aluminium OH 0.0430 100,000.00 4,300.00
3 Kepala Tukang OH 0.0043 110,000.00 473.00
4 Mandor OH 0.0021 120,000.00 252.00
Harga Satuan Pekerjaan 109,765.00
Overhead & profit 10% 10,976.50
Dibulatkan 120,741.50 oke, Konsinyasi
Jenis Pekerjaan : Pemasangan 1 m Selimar aluminium
Acuan : Pendekatan

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Profil selimar aluminium m 1.1000 110,000.00 121,000.00 edit harga satuan
2 Sekrup fixer bh 2.0000 750.00 1,500.00
3 Sealent tube 0.0600 50,000.00 3,000.00
4 Karet m1 1.1000 3,000.00 3,300.00
UPAH
1 Pekerja OH 0.0430 80,000.00 3,440.00
2 Tukang khusus aluminium OH 0.0430 100,000.00 4,300.00
3 Kepala Tukang OH 0.0043 110,000.00 473.00
4 Mandor OH 0.0021 120,000.00 252.00
Harga Satuan Pekerjaan 137,265.00
Overhead & profit 10% 13,726.50
Dibulatkan 150,991.50 oke, Konsinyasi
Jenis Pekerjaan : Pemasangan 1 m2 Kaca polos t= 5 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.2.17

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Kaca t=5 mm m2 1.1000 76,000.00 83,600.00
2 Sealent tube 0.0500 50,000.00 2,500.00
UPAH
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang khusus aluminium OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 120,000.00 96.00
Harga Satuan Pekerjaan 104,046.00
Overhead & profit 10% 10,404.60
Dibulatkan 114,450.60
Jenis Pekerjaan : Pemasangan 1 m2 Kaca Tempered t= 8 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.2.17

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Kaca Tempered 8 mm m2 1.1000 123,200.00 135,520.00
2 Sealent tube 0.0500 50,000.00 2,500.00
UPAH
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang khusus aluminium OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 120,000.00 96.00
Harga Satuan Pekerjaan 155,966.00
Overhead & profit 10% 15,596.60
Dibulatkan 171,562.60
Jenis Pekerjaan : Pemasangan 1 m2 Pintu aluminium strip lebar 8 cm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.2.1.12

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Profil aluminium m 4.4000 88,000.00 387,200.00
2 Aluminium strip m 14.6000 25,000.00 365,000.00
UPAH
1 Pekerja OH 0.0850 80,000.00 6,800.00
2 Tukang khusus aluminium OH 0.0850 100,000.00 8,500.00
3 Kepala Tukang OH 0.0085 110,000.00 935.00
4 Mandor OH 0.0042 120,000.00 504.00
Harga Satuan Pekerjaan 768,939.00
Overhead & profit 10% 76,893.90
Dibulatkan 845,832.90
Jenis Pekerjaan : Pemasangan 1 m2 Pintu kaca rangka aluminium
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.2.1.13

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Profil aluminium m 4.4000 88,000.00 387,200.00
2 Profil kaca m 4.5000 5,000.00 22,500.00
3 Sealent tube 0.2700 50,000.00 13,500.00
UPAH
1 Pekerja OH 0.0850 80,000.00 6,800.00
2 Tukang khusus aluminium OH 0.0850 100,000.00 8,500.00
3 Kepala Tukang OH 0.0090 110,000.00 990.00
4 Mandor OH 0.0050 120,000.00 600.00
Harga Satuan Pekerjaan 440,090.00
Overhead & profit 10% 44,009.00
Dibulatkan 484,099.00
Jenis Pekerjaan : membuat dan memasang 1 m3 kusen pintu dan jendela ,kayu kelas ll dan lll
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Balok kayu m3 1.2000 1,000,000.00 1,200,000.00
2 Paku 10 cm kg 1.2500 15,000.00 18,750.00
3 Lem kayu kg 1.0000 23,848.00 23,848.00
UPAH
1 Pekerja OH 6.0000 80,000.00 480,000.00
2 Tukang kayu OH 18.0000 100,000.00 1,800,000.00
3 Kepala Tukang OH 1.8000 110,000.00 198,000.00
4 Mandor OH 0.3000 120,000.00 36,000.00
Harga Satuan Pekerjaan 3,756,598.00
Overhead & profit 10% 375,659.80
Dibulatkan 4,132,257.80
Jenis Pekerjaan : memasang 1 m2 lantai HT ukuran ( 60 x 60 ) cm polish
Acuan : Modifikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.9

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 HT Bh 2.9167 42,666.66 124,444.43
2 Semen PC kg 9.6000 1,175.00 11,280.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 1.1000 10,000.00 11,000.00 konsinyasi 19 Okt
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.1200 100,000.00 12,000.00
3 Kepala Tukang OH 0.0120 110,000.00 1,320.00
4 Mandor OH 0.0120 120,000.00 1,440.00 ###
Harga Satuan Pekerjaan 187,884.43
Overhead & profit 10% 18,788.44
Dibulatkan 206,672.87
Jenis Pekerjaan : memasang 1 m2 lantai HT ukuran ( 60 x 60 ) cm unpolish
Acuan : Modiikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.9

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah


konsinyasi 19 Okt
1 2 3 4 5 6
BAHAN
1 Keramik Bh 2.9167 49,333.33 143,888.88
2 Semen PC kg 9.6000 1,175.00 11,280.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 1.1000 10,000.00 11,000.00
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.1200 100,000.00 12,000.00
3 Kepala Tukang OH 0.0120 110,000.00 1,320.00
4 Mandor OH 0.0120 120,000.00 1,440.00
Harga Satuan Pekerjaan 207,328.88
Overhead & profit 10% 20,732.89
Dibulatkan 228,061.77
Jenis Pekerjaan : memasang 1 m2 lantai keramik ukuran ( 20 x 20 ) cm unpolish
Acuan : Modifikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.36

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah


konsinyasi 19 Okt
1 2 3 4 5 6
BAHAN
1 Ubin keramik Bh 25.0000 1,792.00 44,800.00
2 Semen PC kg 11.0000 1,175.00 12,925.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.3600 80,000.00 28,800.00
2 Tukang batu OH 0.1800 100,000.00 18,000.00
3 Kepala Tukang OH 0.0180 110,000.00 1,980.00
4 Mandor OH 0.0180 120,000.00 2,160.00
Harga Satuan Pekerjaan 120,865.00
Overhead & profit 10% 12,086.50
Dibulatkan 132,951.50
Jenis Pekerjaan : memasang 1 m2 dinding keramik ukuran ( 20 x 25 ) cm
Acuan : A.4.4.3.36

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Ubin keramik Bh 25.0000 1,792.00 44,800.00
2 Semen PC kg 11.0000 1,175.00 12,925.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.2400 100,000.00 24,000.00
3 Kepala Tukang OH 0.1200 110,000.00 13,200.00
4 Mandor OH 0.1200 120,000.00 14,400.00
Harga Satuan Pekerjaan 140,725.00
Overhead & profit 10% 14,072.50
Dibulatkan 154,797.50
Jenis Pekerjaan : memasang 1 m2 lantai keramik ukuran ( 30 x 30 ) cm polos
Acuan : Modifikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.8

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Ubin keramik Bh 12.0000 4,145.45 49,745.40
2 Semen PC kg 10.4000 1,175.00 12,220.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.3600 80,000.00 28,800.00
2 Tukang batu OH 0.1800 100,000.00 18,000.00
3 Kepala Tukang OH 0.0180 110,000.00 1,980.00
4 Mandor OH 0.0180 120,000.00 2,160.00
Harga Satuan Pekerjaan 125,105.40
Overhead & profit 10% 12,510.54
Dibulatkan 137,615.94
Jenis Pekerjaan : memasang 1 m2 lantai keramik ukuran ( 30 x 30 ) cm Un polish
Acuan : Modifikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.8
No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Ubin keramik Bh 12.0000 4,666.66 55,999.92
2 Semen PC kg 10.4000 1,175.00 12,220.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.2400 100,000.00 24,000.00
3 Kepala Tukang OH 0.1200 110,000.00 13,200.00
4 Mandor OH 0.1200 120,000.00 14,400.00
Harga Satuan Pekerjaan 151,219.92
Overhead & profit 10% 15,121.99
Dibulatkan 166,341.91
Jenis Pekerjaan : memasang 1 m2 lantai keramik ( 40 x 40 ) cm unpolish
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.7

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Ubin keramik bh 6.6300 24,666.66 163,539.96
2 Semen PC kg 9.8000 1,175.00 11,515.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 1.3000 10,000.00 13,000.00
UPAH
1 Pekerja OH 0.6500 80,000.00 52,000.00
2 Tukang batu OH 0.3500 100,000.00 35,000.00
3 Kepala Tukang OH 0.0350 110,000.00 3,850.00
4 Mandor OH 0.0350 120,000.00 4,200.00
Harga Satuan Pekerjaan 290,304.96
Overhead & profit 10% 29,030.50
Dibulatkan 319,335.45
Jenis Pekerjaan : memasang 1 m' Step nozing ( 10 x 60 ) cm
Acuan :

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Step nozing bh 1.6670 15,200.00 25,338.40
2 Semen PC kg 1.0400 1,175.00 1,222.00
3 Pasir Pasang m3 0.0050 160,000.00 800.00
4 semen warna kg 0.1000 10,000.00 1,000.00
UPAH
1 Pekerja OH 0.1150 80,000.00 9,200.00
2 Tukang batu OH 0.0100 100,000.00 1,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0100 120,000.00 1,200.00 ###
Harga Satuan Pekerjaan 41,960.40
Overhead & profit 10% 4,196.04
Dibulatkan 46,156.44
Jenis Pekerjaan : memasang 1 m' Plint lantai ukuran ( 10 x 60 ) cm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.39

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Plin bh 1.6670 12,800.00 21,337.60 cek
2 Semen PC kg 1.0400 1,175.00 1,222.00
3 Pasir Pasang m3 0.0050 160,000.00 800.00
4 semen warna kg 0.1000 10,000.00 1,000.00
UPAH
1 Pekerja OH 0.1150 80,000.00 9,200.00
2 Tukang batu OH 0.0100 100,000.00 1,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 37,959.60
Overhead & profit 10% 3,795.96
Dibulatkan 41,755.56
Jenis Pekerjaan : memasang 1 m2 Keramik dinding ukuran ( 30 x 60 ) cm
Acuan : Pendekatan

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Keramik 30x60 Buah 6.0000 14,666.66 87,999.96
2 Semen PC kg 9.3000 1,175.00 10,927.50
3 Pasir Pasang m3 0.0180 160,000.00 2,880.00
4 Semen warna kg 0.2000 10,000.00 2,000.00 ###
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00 ###
2 Tukang batu OH 0.2400 100,000.00 24,000.00
3 Kepala Tukang OH 0.1200 110,000.00 13,200.00
4 Mandor OH 0.1200 120,000.00 14,400.00
Harga Satuan Pekerjaan 174,607.46
Overhead & profit 10% 17,460.75
Dibulatkan 192,068.21

Jenis Pekerjaan : memasang 1 m2 Keramik dinding ukuran ( 30 x 30 ) cm


Acuan : Pendekatan
No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Keramik 30x30 Buah 12.0000 4,145.45 49,745.40
2 Semen PC kg 9.3000 1,175.00 10,927.50
3 Pasir Pasang m3 0.0180 160,000.00 2,880.00
4 Semen warna kg 0.2000 10,000.00 2,000.00
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.2400 100,000.00 24,000.00
3 Kepala Tukang OH 0.1200 110,000.00 13,200.00
4 Mandor OH 0.1200 120,000.00 14,400.00
Harga Satuan Pekerjaan 136,352.90
Overhead & profit 10% 13,635.29
Dibulatkan 149,988.19

Jenis Pekerjaan : Memasang 1 m2 Rangka baja ringan (Galvalum)


Acuan : Pendekatan

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Profil Galvalum m 4.0000 14,000 56,000
2 Profil Reng baja ringan m 5.0000 6,000 30,000
3 Dinabolt buah 0.7000 1,600 1,120
4 Sekrup fixer buah 45.0000 320 14,400
5 Alumunium foil 1 sisi m2 1.0000 - -
UPAH
1 Tukang OH 0.3400 100,000 34,000
2 Kepala Tukang OH 0.0340 110,000 3,740
3 Mandor OH 0.0340 120,000 4,080 ###
Harga Satuan Pekerjaan 143,340
Overhead & profit 10% 14,334.00
Dibulatkan 157,674.00
Jenis Pekerjaan : 1 M2 Pasang Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 4.0000 14,000.00 56,000.00
2 Paku skrup Kg 0.1500 14,000.00 2,100.00
UPAH
1 Pekerja Or Hr 0.3000 80,000.00 24,000.00
2 Tukang besi Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0150 110,000.00 1,650.00
4 Mandor Or Hr 0.0075 120,000.00 900.00

Harga Satuan Pekerjaan 99,650.00


Overhead & profit 10% 9,965.00
Dibulatkan 109,615.00
Jenis Pekerjaan : Pemasangan 1 m2 langit-langit, gypsumboard t=9 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.5.1.7

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Gypsumboard lbr 0.3640 58,520.00 21,301.28
2 Paku skrup Kg 0.1100 14,000.00 1,540.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 36,991.28


Overhead & profit 10% 3,699.13
Dibulatkan 40,690.41
Jenis Pekerjaan : Pemasangan 1 m2 langit-langit, GRC board t=6 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 GRC board lbr 0.3640 60,000.00 21,840.00
2 Paku skrup Kg 0.1100 14,000.00 1,540.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 37,530.00


Overhead & profit 10% 3,753.00
Dibulatkan 41,283.00
Jenis Pekerjaan : Pemasangan 1 m2 langit-langit PVC
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
1 PVC m1 1.0000 150,000.00 150,000.00
2 Paku skrup Kg 0.1100 14,000.00 1,540.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 165,690.00


Overhead & profit 10% 16,569.00
Dibulatkan 182,259.00
Jenis Pekerjaan : Pemasangan 1 m1 List Gypsum
Acuan : Pendekatan

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 List Gypsum m 1.0500 6,000.00 6,300.00
2 Paku skrup Kg 0.0100 14,000.00 140.00
UPAH
1 Pekerja Or Hr 0.0500 80,000.00 4,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0030 120,000.00 360.00

Harga Satuan Pekerjaan 16,350.00


Overhead & profit 10% 1,635.00
Dibulatkan 17,985.00
Jenis Pekerjaan : Pemasangan 1 m1 List PVC
Acuan : Pendekatan
No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
1 List PVC m 1.0500 25,000.00 26,250.00
2 Paku skrup Kg 0.0100 14,000.00 140.00
UPAH
1 Pekerja Or Hr 0.0500 80,000.00 4,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0030 120,000.00 360.00

Harga Satuan Pekerjaan 36,300.00


Overhead & profit 10% 3,630.00
Dibulatkan 39,930.00
Jenis Pekerjaan : Pemasangan 1 m' lisplank ukuran (0.9x30) cm, GRC
Acuan : Pendekatan

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 GRC lebar 30 cm tb=9 mm m' 1.0500 16,000.00 16,800.00
2 Paku sekrup Kg 0.0500 14,000.00 700.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.2000 100,000.00 20,000.00
3 KepalaTukang Kayu Or Hr 0.0200 110,000.00 2,200.00
4 Mandor Or Hr 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 48,300.00


Overhead & profit 10% 4,830.00
Dibulatkan 53,130.00
Jenis Pekerjaan : Pasang Atap Spandek Berpasir
Acuan : Modifikasi/Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.5.2.41

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Spandek berpasir m' 1.0500 93,500.00 98,175.00
2 Skrup buah 9.0000 750.00 6,750.00
3 Alumenium Foil m2 6,000.00 -
UPAH
1 Pekerja Or Hr 0.1500 80,000.00 12,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0800 110,000.00 8,800.00
4 Mandor Or Hr 0.0060 120,000.00 720.00

Harga Satuan Pekerjaan 141,445.00


Overhead & profit 10% 14,144.50
Dibulatkan 155,589.50 ok
Jenis Pekerjaan : Pemasangan 1 m2 dinding partisi, gypsumboard t=9 mm
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Gypsumboard lbr 0.7280 58,520.00 42,602.56
2 Rockwall m2 1.1000 24,444.44 26,888.88
3 Paku skrup Kg 0.2000 14,000.00 2,800.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 86,441.44


Overhead & profit 10% 8,644.14
Dibulatkan 95,085.59
Jenis Pekerjaan : 1 M2 Pasang Rangka Metal Stud
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Plat Track m' 0.8000 12,000.00 9,600.00
2 Plat Stud m' 4.0000 13,200.00 52,800.00
3 Scrup Kg 0.2500 11,200.00 2,800.00
UPAH
1 Pekerja Or Hr 0.1750 80,000.00 14,000.00
2 Tukang besi Or Hr 0.1750 100,000.00 17,500.00
3 Kepala Tukang Or Hr 0.0175 110,000.00 1,925.00
4 Mandor Or Hr 0.0090 120,000.00 1,080.00

Harga Satuan Pekerjaan 99,705.00


Overhead & profit 10% 9,970.50
Dibulatkan 109,675.50
Jenis Pekerjaan : Pasang Atap Genteng Kodok

Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Genteng kodok Bh 25.0000 3,040.00 76,000.00

UPAH

1 Pekerja Or Hr 0.1500 80,000.00 12,000.00


2 Tukang Or Hr 0.0750 100,000.00 7,500.00

3 Kepala Tukang Or Hr 0.0080 110,000.00 880.00

4 Mandor Or Hr 0.0080 120,000.00 960.00

Harga Satuan Pekerjaan 97,340.00


Overhead & profit 10% 9,734.00
Dibulatkan 107,074.00
Jenis Pekerjaan : Pasang Nok Genteng Metal
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.5.2.37

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Nok Genteng metal Buah 0.8500 20,000.00 17,000.00
2 Skrup Buah 6.0000 750.00 4,500.00
UPAH
1 Pekerja Or Hr 0.2500 80,000.00 20,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0150 110,000.00 1,650.00
4 Mandor Or Hr 0.0130 120,000.00 1,560.00

Harga Satuan Pekerjaan 59,710.00


Overhead & profit 10% 5,971.00
Dibulatkan 65,681.00
Jenis Pekerjaan : Pemasangan 1 buah closed duduk biasa tambahan analisa
Acuan : A.5.1.1.1

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Closet duduk biasa Buah 1.0000 1,000,000.00 1,000,000.00
2 Perlengkapan ls 6% x closet 60,000.00 60,000.00
UPAH
1 Pekerja Or Hr 3.3000 80,000.00 264,000.00
2 Tukang Or Hr 1.1000 100,000.00 110,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.1600 120,000.00 19,200.00

Harga Satuan Pekerjaan 1,454,300.00


Overhead & profit 10% 145,430.00
Dibulatkan 1,599,730.00
Jenis Pekerjaan : Pemasangan 1 buah Urinoir
Acuan : A.5.1.1.1

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Urinoir Buah 1.0000 280,000.00 280,000.00
2 Perlengkapan ls 6% x Urinoir 16,800.00 16,800.00
UPAH
1 Pekerja Or Hr 3.3000 80,000.00 264,000.00
2 Tukang Or Hr 1.1000 100,000.00 110,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.1600 120,000.00 19,200.00

Harga Satuan Pekerjaan 691,100.00


Overhead & profit 10% 69,110.00
Dibulatkan 760,210.00
Jenis Pekerjaan : Pemasangan 1 buah closed duduk buang belakang
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.5.1.1.1

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Closet duduk buang belakang Buah 1.0000 2,800,000.00 2,800,000.00
2 Perlengkapan ls 6% x closet 168,000.00 168,000.00
UPAH
1 Pekerja Or Hr 3.3000 80,000.00 264,000.00
2 Tukang Or Hr 1.1000 100,000.00 110,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.1600 120,000.00 19,200.00

Harga Satuan Pekerjaan 3,362,300.00


Overhead & profit 10% 336,230.00
Dibulatkan 3,698,530.00
Jenis Pekerjaan : Pemasangan 1 buah closed Jongkok
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Closet Jongkok "Lokal" Unit 1.0000 128,000.00 128,000.00
2 Semen PC 50 kg Kg 6.0000 1,175.00 7,050.00
2 Pasir Pasang M3 0.0100 160,000.00 1,600.00
UPAH
1 Pekerja Or Hr 0.5000 80,000.00 40,000.00
2 Tukang Or Hr 0.7500 100,000.00 75,000.00
3 Kepala Tukang Or Hr 0.0800 110,000.00 8,800.00
4 Mandor Or Hr 0.0750 120,000.00 9,000.00

Harga Satuan Pekerjaan 269,450.00


Overhead & profit 10% 26,945.00
Dibulatkan 296,395.00
Jenis Pekerjaan : Pemasangan 1 buah Partisi Urinoir tambahan analisa
Acuan : A.5.1.1.1

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Partisi Urinoir Buah 1.0000 840,000.00 840,000.00
2 Perlengkapan ls 6% x Part. Urinoi 50,400.00 50,400.00
UPAH
1 Pekerja Or Hr 1.6500 80,000.00 132,000.00
2 Tukang Or Hr 0.5500 100,000.00 55,000.00
3 Kepala Tukang Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0800 120,000.00 9,600.00

Harga Satuan Pekerjaan 1,087,550.00


Overhead & profit 10% 108,755.00
Dibulatkan 1,196,305.00
Jenis Pekerjaan : Pemasangan 1 buah jet washer
Acuan : A.5.1.1.1 tambahan analisa

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Jet Washer Buah 1.0000 60,000.00 60,000.00
2 Kran Toilet Buah 1.0000 75,000.00 75,000.00
3 Perlengkapan ls 0.4000 12,800.00 5,120.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00

Harga Satuan Pekerjaan 148,120.00


Overhead & profit 10% 14,812.00
Dibulatkan 162,932.00
Jenis Pekerjaan : Pemasangan 1 buah Floor drain
Acuan : A.5.1.1.1 tambahan analisa

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Floor drain stainless Buah 1.0000 30,000.00 30,000.00
2 Perlengkapan ls 0.4000 12,800.00 5,120.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Pekera coring beton ls 1.0000 128,000.00 128,000.00

Harga Satuan Pekerjaan 171,120.00


Overhead & profit 10% 17,112.00
Dibulatkan 188,232.00
Pemasangan 1 kran shower

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.010 80,000 800.00
2 Tukang batu L.02 OH 0.100 100,000 10,000.00
3 Kepala tukang L.03 OH 0.010 110,000 1,100.00
4 Mandor L.04 OH 0.005 120,000 600.00
JUMLAH TENAGA KERJA 12,500.00
B BAHAN
1 Kran Shower Unit 1.000 250,000.00 250,000.00
2 Seal tape Bh 0.025 12,800.00 320.00
JUMLAH HARGA BAHAN 250,320.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 262,820.00
E Overhead & Profit (Contoh 10%) 10% x D 26,282.00
F Harga Satuan Pekerjaan (D+E) 289,102.00
Jenis Pekerjaan : Pemasangan 1 buah wastafel meja - Toilet Umum
Acuan : Pendekatan A.5.1.1.1

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
Wastafel unit 1.0000 560,000.00 560,000.00
kran set unit 1.0000 82,500.00 82,500.00
Semen kg 6.0000 1,175.00 7,050.00
Pasir pasang m3 - 160,000.00 -
Perlengkapan % - - -
UPAH
Pekerja Or Hr 1.2000 80,000.00 96,000.00
2 Tukang Or Hr 1.4500 100,000.00 145,000.00
3 Kepala Tukang Or Hr 0.1500 110,000.00 16,500.00
4 Mandor Or Hr 0.0600 120,000.00 7,200.00

Harga Satuan Pekerjaan 914,250.00


Overhead & profit 10% 91,425.00
Dibulatkan 1,005,675.00
Jenis Pekerjaan : Pemasangan 1 buah wastafel
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.5.1.1.1

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Wastafel + kran set unit 1.0000 220,000.00 220,000.00 edit link
2 kran set unit 1.0000 82,500.00 82,500.00 delete kran
2 Semen kg 6.0000 1,175.00 7,050.00
3 Pasir pasang m3 - 160,000.00 -
4 Perlengkapan % - - -
UPAH
1 Pekerja Or Hr 1.2000 80,000.00 96,000.00
2 Tukang Or Hr 1.4500 100,000.00 145,000.00
3 Kepala Tukang Or Hr 0.1500 110,000.00 16,500.00
4 Mandor Or Hr 0.0600 120,000.00 7,200.00

Harga Satuan Pekerjaan 574,250.00


Overhead & profit 10% 57,425.00
Dibulatkan 631,675.00
Jenis Pekerjaan : Pemasangan 1 buah kran dia 1/2" atau 3/4"
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.5.1.1.19

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kran air unit 1.0000 20,000.00 20,000.00
2 Sealtipe bh 0.0250 12,800.00 320.00
UPAH
1 Pekerja Or Hr 0.0100 80,000.00 800.00
2 Tukang Or Hr 0.4000 100,000.00 40,000.00
3 Kepala Tukang Or Hr 0.0400 110,000.00 4,400.00
4 Mandor Or Hr 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 66,120.00


Overhead & profit 10% 6,612.00
Dibulatkan 72,732.00
Jenis Pekerjaan : Pemasangan 1 Kitchen sink
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.5.1.1.19

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kitchen sink unit 1.0000 328,240.00 328,240.00
2 Kran Leher Angsa unit 1.0000 197,600.00 197,600.00
3 Sealtipe bh 0.0250 12,800.00 320.00
UPAH
1 Pekerja Or Hr 0.0100 80,000.00 800.00
2 Tukang Or Hr 0.4000 100,000.00 40,000.00
3 Kepala Tukang Or Hr 0.0400 110,000.00 4,400.00
4 Mandor Or Hr 0.0050 120,000.00 600.00

Harga Satuan Pekerjaan 571,960.00


Overhead & profit 10% 57,196.00
Dibulatkan 629,156.00
Jenis Pekerjaan : Pintu type PJ1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 18.2600 120,741.50 2,204,739.79
2 Selimar aluminium m' 21.0400 150,991.50 3,176,861.16
3 Kaca polos t=5 mm m2 3.6920 114,450.60 422,547.04
4 Kaca temperd t=8 mm m2 2.1960 171,562.60 376,751.47
5 Sealent kusen & dinding m' 10.1900 5,000.00 50,950.00
6 Engsel pintu bh 6.0000 25,000.00 150,000.00
7 Engsel jendela bh 8.0000 25,000.00 200,000.00
8 Hak angin bh 8.0000 50,000.00 400,000.00
9 Handle pintu set 2.0000 200,000.00 400,000.00
10 Pengunci set 1.0000 150,000.00 150,000.00
11 Grendel jendela bh 1.0000 50,000.00 50,000.00
12 Grendel pintu atas set 1.0000 50,000.00 50,000.00

Harga Satuan Pekerjaan 7,631,849.46


Overhead & profit 10% 763,184.95
Dibulatkan 8,395,034.40
Jenis Pekerjaan : Pintu type PJ2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 14.8600 120,741.50 1,794,218.69
2 Selimar aluminium m' 23.0400 150,991.50 3,478,844.16
3 Kaca polos t=5 mm m2 1.2715 114,450.60 145,523.94
4 Kaca Tempered 8 mm m2 2.1476 171,562.60 368,447.84
5 Sealent kusen & dinding m' 8.7600 5,000.00 43,800.00
6 Engsel pintu bh 6.0000 25,000.00 150,000.00
7 Engsel jendela bh 8.0000 25,000.00 200,000.00
8 Hak angin bh 8.0000 50,000.00 400,000.00
9 Handle pintu set 2.0000 200,000.00 400,000.00
10 Pengunci set 1.0000 150,000.00 150,000.00
11 Grendel jendela bh 4.0000 50,000.00 200,000.00
12 Grendel pintu atas set 1.0000 50,000.00 50,000.00

Harga Satuan Pekerjaan 7,380,834.63


Overhead & profit 10% 738,083.46
Dibulatkan 8,118,918.09
Jenis Pekerjaan : Pintu type PJ3
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 14.0140 120,741.50 1,692,071.38
2 Selimar aluminium m' 8.8000 150,991.50 1,328,725.20
3 Kaca polos t=5 mm m2 3.5831 114,450.60 410,087.94
4 Sealent kusen & dinding m' 7.6140 5,000.00 38,070.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Engsel jendela bh 2.0000 25,000.00 50,000.00
7 Hak angin bh 2.0000 50,000.00 100,000.00
8 Handle pintu set 1.0000 200,000.00 200,000.00
9 Pengunci set 1.0000 150,000.00 150,000.00
10 Grendel jendela bh 2.0000 50,000.00 100,000.00
11 Grendel pintu atas set - 50,000.00 -

Harga Satuan Pekerjaan 4,143,954.53


Overhead & profit 10% 414,395.45
Dibulatkan 4,558,349.98
Jenis Pekerjaan : Pintu type P1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 7.0000 120,741.50 845,190.50
2 Daun pintu enggineering door uk.0.82x2.1 unit 1.0000 1,600,000.00 1,600,000.00
3 Selimar aluminium m' - 150,991.50 -
4 Kaca polos t=5 mm m2 0.3948 114,450.60 45,185.10
5 Sealent kusen & dinding m' 6.0000 5,000.00 30,000.00
6 Engsel pintu bh 3.0000 25,000.00 75,000.00
7 Handle pintu + pengunci set 1.0000 200,000.00 200,000.00
8 Engsel jendela bh - 25,000.00 -
9 Hak angin bh - 50,000.00 -
10 Grendel jendela bh - 50,000.00 -

Harga Satuan Pekerjaan 2,795,375.60


Overhead & profit 10% 279,537.56
Dibulatkan 3,074,913.16
Jenis Pekerjaan : Pintu type P2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 6.8000 120,741.50 821,042.20
2 Daun pintu enggineering door uk.0.82x2.1 unit 1.0000 1,280,000.00 1,280,000.00
3 Selimar aluminium m' - 150,991.50 -
4 Kaca polos t=5 mm m2 0.3948 114,450.60 45,185.10
5 Sealent kusen & dinding m' 5.9000 5,000.00 29,500.00
6 Engsel pintu bh 3.0000 25,000.00 75,000.00
7 Handle pintu + pengunci set 1.0000 200,000.00 200,000.00
8 Engsel jendela bh - 25,000.00 -
9 Hak angin bh - 50,000.00 -
10 Grendel jendela bh - 50,000.00 -

Harga Satuan Pekerjaan 2,450,727.30


Overhead & profit 10% 245,072.73
Dibulatkan 2,695,800.03
Jenis Pekerjaan : Pintu type P3
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 7.0000 120,741.50 845,190.50
2 Selimar aluminium m' 8.6000 150,991.50 1,298,526.90
3 Kaca polos t=5 mm m2 1.5168 114,450.60 173,598.67
4 Sealent kusen & dinding m' 6.0000 5,000.00 30,000.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Handle pintu + pengunci set 1.0000 200,000.00 200,000.00
7 Engsel jendela bh 2.0000 25,000.00 50,000.00
8 Hak angin bh 2.0000 50,000.00 100,000.00
9 Grendel jendela bh 1.0000 50,000.00 50,000.00

Harga Satuan Pekerjaan 2,822,316.07


Overhead & profit 10% 282,231.61
Dibulatkan 3,104,547.68
Jenis Pekerjaan : Pintu type P4
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6 7.848
BAHAN
1 Pintu Besi kg 24.6225 14,000.00 344,714.99
2 Handle Besi & pengunci bh 1.0000 280,000.00 280,000.00
3 Engsel Besi bh 3.0000 25,000.00 75,000.00
4 Kusen Besi hollow 60.60 kg 18.3333 14,000.00 256,666.67
5 Plat besi utk louvre kg 1.4910 14,200.00 21,172.73
6 Cat Duco kg 0.2500 22,000.00 5,500.00
7 Cat Duco kg 0.9500 41,600.00 39,520.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
Jumlah 1,190,095.81
Overhead + Profit (10%) 10% x D 119,009.58
Dibulatkan 1,309,105.39
Jenis Pekerjaan : Pintu type PD
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6 7.848
BAHAN
1 Pintu Besi kg 23.2790 14,000.00 325,906.17
2 Handle Besi & pengunci bh 1.0000 280,000.00 280,000.00
3 Engsel Besi bh 3.0000 68,000.00 204,000.00
4 Kusen Besi hollow 60.60 kg 18.6267 14,000.00 260,773.33
6 Plat besi utk louvre kg 1.2963 14,200.00 18,407.23
6 Cat Duco kg 0.2500 22,000.00 5,500.00
6 Cat Duco kg 0.9500 41,600.00 39,520.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
Jumlah 1,301,628.17
Overhead + Profit (10%) 10% x D 130,162.82
Dibulatkan 1,431,790.98
Jenis Pekerjaan : Pintu UPVC type PT
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Pintu UPVC Lengkap unit 1.0000 845,600.00 845,600.00

UPAH
1 Pemasangan Pintu unit 1.0000 253,680.00 253,680.00

Harga Satuan Pekerjaan 1,099,280.00


Overhead & profit 10% 109,928.00
Dibulatkan 1,209,208.00
Jenis Pekerjaan : Pintu type PT
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 5.3600 120,741.50 647,174.44
2 Daun pintu Alumunium unit 1.0000 1,000,000.00 1,000,000.00
3 Sealent kusen & dinding m' 10.7200 5,000.00 53,600.00
4 Engsel pintu bh 3.0000 25,000.00 75,000.00
5 Handle pintu + pengunci set 1.0000 280,000.00 280,000.00

Harga Satuan Pekerjaan 2,055,774.44


Overhead & profit 10% 205,577.44
Dibulatkan 2,261,351.88
Jenis Pekerjaan : Pintu type PB
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Pintu Besi kg 47.5813 14,000.00 666,138.85
2 Handle Besi & pengunci bh 2.0000 280,000.00 560,000.00
3 Engsel Besi bh 6.0000 68,000.00 408,000.00
4 Kusen Besi hollow 60.60 kg 20.8633 14,000.00 292,086.67
6 Plat besi utk louvre kg 1.0888 14,200.00 15,461.66
6 Cat Duco kg 0.5000 22,000.00 11,000.00
6 Cat Duco kg 1.9000 41,600.00 79,040.00
UPAH PASANG
1 Tukang Las Oh 1.7486 100,000.00 174,857.14
2 Kepala Tukang Oh 0.8329 110,000.00 91,614.29
3 Mandor Oh 0.5714 120,000.00 68,571.43
Jumlah 2,366,770.04
Overhead & profit 10% 236,677.00
Dibulatkan 2,603,447.04
Jenis Pekerjaan : Pintu type PS
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium m' 5.0200 120,741.50 606,122.33
2 Selimar aluminium bh 4.7100 150,991.50 711,169.97
3 Plat Aluminium m2 0.9865 140,000.00 138,103.00
4 Sealent kusen & dinding m' 10.0400 5,000.00 50,200.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Handle pintu, satu sisi set 1.0000 280,000.00 280,000.00

Harga Satuan Pekerjaan 1,860,595.30


Overhead & profit 10% 186,059.53
Dibulatkan 2,046,654.82
Jenis Pekerjaan : Jendela type J-1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 9.3600 120,741.50 1,130,140.44
2 Selimar aluminium m' 9.6000 150,991.50 1,449,518.40
3 Kaca polos t=5 mm m2 1.5476 114,450.60 177,123.75
4 Sealent kusen & dinding m' 12.4800 5,000.00 62,400.00
5 Engsel jendela bh 8.0000 25,000.00 200,000.00
6 Hak angin bh 8.0000 50,000.00 400,000.00
7 Grendel jendela bh 4.0000 50,000.00 200,000.00

Harga Satuan Pekerjaan 3,619,182.59


Overhead & profit 10% 361,918.26
Dibulatkan 3,981,100.85
Jenis Pekerjaan : Jendela type J-2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 5.5900 120,741.50 674,944.99
2 Selimar aluminium m' 4.8000 150,991.50 724,759.20
3 Kaca polos t=5 mm m2 0.7738 114,450.60 88,561.87
4 Sealent kusen & dinding m' 9.7200 5,000.00 48,600.00
5 Engsel jendela bh 4.0000 25,000.00 100,000.00
6 Hak angin bh 4.0000 50,000.00 200,000.00
7 Grendel jendela bh 2.0000 50,000.00 100,000.00

Harga Satuan Pekerjaan 1,936,866.06


Overhead & profit 10% 193,686.61
Dibulatkan 2,130,552.67
Jenis Pekerjaan : Jendela type J-3
Acuan :
No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 12.2000 120,741.50 1,473,046.30
2 Selimar aluminium m' 9.0000 150,991.50 1,358,923.50
3 Jalusi m' 21.5600 25,000.00 539,000.00
4 Kaca polos t=5 mm m2 1.3406 114,450.60 153,432.47
5 Sealent kusen & dinding m' 14.0000 5,000.00 70,000.00
6 Engsel jendela bh 8.0000 25,000.00 200,000.00
7 Hak angin bh 8.0000 50,000.00 400,000.00
8 Grendel jendela bh 4.0000 50,000.00 200,000.00

Harga Satuan Pekerjaan 4,394,402.27


Overhead & profit 10% 439,440.23
Dibulatkan 4,833,842.50
Jenis Pekerjaan : Jendela type J-4
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 11.4200 120,741.50 1,378,867.93
2 Selimar aluminium m' 4.1200 150,991.50 622,084.98
3 Kaca polos t=5 mm m2 1.3946 114,450.60 159,612.81
4 Sealent kusen & dinding m' 9.9600 5,000.00 49,800.00
5 Engsel jendela bh 2.0000 25,000.00 50,000.00
6 Hak angin bh 2.0000 50,000.00 100,000.00
7 Grendel jendela bh 2.0000 50,000.00 100,000.00

Harga Satuan Pekerjaan 2,460,365.72


Overhead & profit 10% 246,036.57
Dibulatkan 2,706,402.29
Jenis Pekerjaan : Glass Block + Rooster 20X20 (lengkap terpasang) type RB-1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Roster bh 14.0000 6,900.00 96,600.00
2 glassblock bh 14.0000 36,000.00 504,000.00
3 Benangan m' 4.6000 19,742.25 90,814.35

Harga Satuan Pekerjaan 691,414.35


Overhead & profit 10% 69,141.44
Dibulatkan 760,555.78
Jenis Pekerjaan : Glass Block + Rooster 20X20 (lengkap terpasang) type RB-2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Roster bh 6.0000 6,900.00 41,400.00
2 glassblock bh 3.0000 36,000.00 108,000.00
3 Benangan m' 2.4000 19,742.25 47,381.40

Harga Satuan Pekerjaan 196,781.40


Overhead & profit 10% 19,678.14
Dibulatkan 216,459.54
Jenis Pekerjaan : Rooster 20X20 (lengkap terpasang) type RB-3
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Roster bh 28.0000 6,900.00 193,200.00
2 Benangan m' 7.2000 19,742.25 142,144.20

Harga Satuan Pekerjaan 335,344.20


Overhead & profit 10% 33,534.42
Dibulatkan 368,878.62
Jenis Pekerjaan : Glass Block + Rooster 20X20 (lengkap terpasang) type RB-4
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Roster bh 8.0000 6,900.00 55,200.00
2 glassblock bh 8.0000 36,000.00 288,000.00
3 Benangan m' 3.2000 19,742.25 63,175.20

Harga Satuan Pekerjaan 406,375.20


Overhead & profit 10% 40,637.52
Dibulatkan 447,012.72
Jenis Pekerjaan : Glass Block + Rooster 20X20 (lengkap terpasang) type RB-5
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Roster bh 18.0000 6,900.00 124,200.00
2 glassblock bh 9.0000 9,900.00 89,100.00
3 Benangan m' 7.2000 19,742.25 142,144.20

Harga Satuan Pekerjaan 355,444.20


Overhead & profit 10% 35,544.42
Dibulatkan 390,988.62
Jenis Pekerjaan : Boven type BV-1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 1.9600 120,741.50 236,653.34
2 Kaca polos t=5 mm m2 0.2100 114,450.60 24,034.63
3 Sealent kusen & dinding m' 3.9200 5,000.00 19,600.00

Harga Satuan Pekerjaan 280,287.97


Overhead & profit 10% 28,028.80
Dibulatkan 308,316.76
Jenis Pekerjaan : Boven type BV-2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 3.4400 120,741.50 415,350.76
2 Kaca polos t=5 mm m2 0.4200 114,450.60 48,069.25
3 Sealent kusen & dinding m' 6.0800 5,000.00 30,400.00

Harga Satuan Pekerjaan 493,820.01


Overhead & profit 10% 49,382.00
Dibulatkan 543,202.01
Jenis Pekerjaan : Jendela type JL-1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Besi Hollow 40x40 cm m' 10.0000 14,000.00 140,000.00
2 Besi Hollow 40x20 cm m' 7.1500 12,000.00 85,800.00
3 Cat Meni Kg 0.1500 22,000.00 3,300.00
4 Cat Minyak Kg 0.2500 41,600.00 10,400.00
UPAH PASANG
1 Tukang Las Oh 0.4371 100,000.00 43,714.29
2 Kepala Tukang Oh 0.2082 110,000.00 22,903.57
4 Mandor Oh 0.1429 120,000.00 17,142.86

Harga Satuan Pekerjaan 323,260.71


Overhead & profit 10% 32,326.07
Dibulatkan 355,586.79
Jenis Pekerjaan : Railing type R-1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Besi Hollow 40x40 cm m' 35.7000 14,000.00 499,800.00
3 Cat Meni Kg 0.1750 22,000.00 3,850.00
4 Cat Minyak Kg 0.2750 41,600.00 11,440.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71

Harga Satuan Pekerjaan 682,611.43


Overhead & profit 10% 68,261.14
Dibulatkan 750,872.57
Jenis Pekerjaan : Railing type R-2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Besi Hollow 40x40 cm m' 18.9600 14,000.00 265,440.00
3 Cat Meni Kg 0.1250 22,000.00 2,750.00
4 Cat Minyak Kg 0.2250 41,600.00 9,360.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71

Harga Satuan Pekerjaan 445,071.43


Overhead & profit 10% 44,507.14
Dibulatkan 489,578.57
Jenis Pekerjaan : Pasang Logo Signage PU , baja 3mm uk 8080,finish duo doff (terpasang pada tempatnya)
: UKURAN 800 X 800

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Plat Besi 3mm kg 43.7100 14,000.00 611,940.00
2 Kawat las kg 0.0450 55,000.00 2,475.00
3 Cat Duco doff kg 0.8000 41,600.00 33,280.00
4 Baut 12 cm bh 6.0000 2,700.00 16,200.00
5 Material Bantu (amplas, dempul, las, dll) ls 1.0000 132,779.00 132,779.00
6 Alat Bantu pasang di atas bangunan ls 1.0000 119,501.10 119,501.10
UPAH
1 Pekerja Or Hr 2.1100 80,000.00 168,800.00
2 Tukang Las Or Hr 3.8990 100,000.00 389,900.00
3 Kepala Tukang Or Hr 2.0000 110,000.00 220,000.00
4 Mandor Or Hr 2.0000 120,000.00 240,000.00
Harga Satuan Pekerjaan 1,934,875.10
Overhead & profit 10% 193,487.51
Dibulatkan 2,128,362.61
Jenis Pekerjaan : Railling pipa Black Steel dia 2,5"
:

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Pipa black steel 2,5" m' 1.0500 78,513.33 82,439.00 ###
2 Las Ls 1.0000 49,463.40 49,463.40
UPAH -
1 Pekerja Or Hr 0.0720 80,000.00 5,760.00
2 Tukang Besi Or Hr 0.0180 100,000.00 1,800.00
3 Tukang Las Or Hr 0.0180 100,000.00 1,800.00
4 Mandor Or Hr 0.0071 120,000.00 852.00
Harga Satuan Pekerjaan 142,114.39
Overhead & profit 10% 14,211.44
Dibulatkan 156,325.83
Jenis Pekerjaan : 1 Unit Pas. besi BS railling ramp difable dia. 2", 3/4" dan 1" finish cat.
:

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Pipa Black steel 3" m' 10.9800 161,666.66 1,775,099.93
2 Pipa Black steel 2" m' 10.0200 65,000.00 651,300.00
3 Pipa Black steel 1" m' 27.7200 50,000.00 1,386,000.00
4 Tiang Hand Railling (Hollow) m' 9.0000 500,000.00 4,500,000.00 ###
5 Las Ls 1.0000 290,934.00 290,934.00
UPAH
1 Pekerja Or Hr 0.0720 80,000.00 5,760.00
2 Tukang Besi Or Hr 0.0180 100,000.00 1,800.00
3 Tukang Las Or Hr 0.0180 100,000.00 1,800.00
4 Mandor Or Hr 0.0071 120,000.00 852.00
Harga Satuan Pekerjaan 8,613,545.92
Overhead & profit 10% 861,354.59
Dibulatkan 9,474,900.52
1 buah papan nama pekerjaan menggunkan multiflex 18 mm, frame besi siku dan tiang kayu 8/12

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang Kayu OH 1.0000 100,000.00 100,000.00
Kepala Tukang Kayu OH 0.1000 110,000.00 11,000.00
Tukang Cat dan Tulis L.01 OH 1.5000 100,000.00 150,000.00
Mandor L.04 OH 0.1000 120,000.00 12,000.00
JUMLAH TENAGA KERJA 353,000.00
B BAHAN
multipleks tebal 18mm lbr 0.3500 200,000.00 70,000.00
tinggi tiang kayu 8/12 kelas II, tinggi 4 meter m3 0.0770 1,000,000.00 77,000.00
frame besi kg 5.8000 14,000.00 81,200.00
Paku campuran kg 1.2500 15,000.00 18,750.00
cat kayu kg 2.5000 41,600.00 104,000.00
JUMLAH HARGA BAHAN 350,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 703,950.00


E Overhead & Profit (Contoh 15 %) 10% x D 0.10 70,395.00
F Harga Satuan Pekerjaan (D+E) 774,345.00
Jenis Pekerjaan : 1 M2 Direksi Keet (lengkap)
:
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 2.0000 80,000.00 160,000.00
2 Tukang Kayu L.02 OH 2.0000 100,000.00 200,000.00
3 Tukang Batu L.02 OH 1.0000 100,000.00 100,000.00
4 Kepala Tukang L.03 OH 0.3000 110,000.00 33,000.00
5 Mandor L.04 OH 0.0500 120,000.00 6,000.00
Jumlah Harga Tenaga Kerja 499,000.00
B. Bahan
1 Kayu m3 0.1800 1,000,000.00 180,000.00
2 Paku kg 0.8000 15,000.00 12,000.00
3 Semen Portland kg 35.0000 1,175.00 41,125.00
4 Pasir pasang m3 0.1500 160,000.00 24,000.00
5 Pasir beton m3 0.1000 160,000.00 16,000.00
6 Koral beton m3 0.1500 160,000.00 24,000.00
7 Bata merah bh 30.0000 600.00 18,000.00
8 Kayu Dolken Ø 8 - 10 / 4 m Btg 1.2500 10,000.00 12,500.00
9 Seng plat lbr 0.2500 26,400.00 6,600.00
10 Triplek 4 mm lbr 0.0600 55,000.00 3,300.00
11 Jendela Naco m2 0.2000 32,800.00 6,560.00
12 Kaca Polos m2 0.0800 68,000.00 5,440.00
13 Kunci Tanam bh 0.1500 200,000.00 30,000.00

Jumlah Harga Bahan 379,525.00


C. Peralatan ls 1.0000 -
Jumlah Harga Peralatan -
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 878,525.00
E. Overhead + Profit (10%) 10% x D 87,852.50
F. Harga Satuan Pekerjaan per-m2 (D+E) 966,300.00
A.4.4.3.65. Pemasangan 1 m2 paving block natural tebal 8 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01.01 OH 0.5000 80,000 40,000.00
Tukang Kayu L.02.04 OH 0.5000 100,000 50,000.00
Kepala tukang L.03.01 OH 0.0500 110,000 5,500.00
Mandor L.04.01 OH 0.0013 120,000 156.00
JUMLAH TENAGA KERJA 95,656.00
B BAHAN
Paving block 8 cm natural M2 1.01 84,000 84,840.00
Pasir beton M3 0.07 160,000 11,200.00
JUMLAH HARGA BAHAN 96,040.00
C PERALATAN
Peralatan Kerja Paving Blok % 0.1000 96,040 9,604.00
JUMLAH HARGA ALAT 9,604.00
D Jumlah (A+B+C) 201,300.00
E Overhead & Profit 10% 10% 20,130.00
F Harga Satuan Pekerjaan (D+E) 221,430.00
A.4.1.1.19 Pemasangan 100 kg jaring kawat baja (wiremesh)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.2500 80,000 20,000.00
Tukang Besi L.02 OH 0.2500 100,000 25,000.00
Kepala Tukang L.03 OH 0.0250 110,000 2,750.00
Mandor L.04 OH 0.0250 120,000 3,000.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN
Wire mesh kg 102.0000 11,000 1,122,000.00
Kawat beton kg 0.5000 20,000 10,000.00
JUMLAH HARGA BAHAN 1,132,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,182,750.00
E Overhead & Profit 10% 10% 118,275.00
F Harga Satuan Pekerjaan (D+E) 1,301,025.00
1Kg Besi 13,010.25
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 110,000.00 3,080.00
Mandor L.04 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 172,540.00
B BAHAN
Semen portland/PC kg 247.0000 1,175.00 290,225.00
Pasir Beton/PB kg 869.0000 185.71 161,381.99
Kerikil (Maks 30 mm)/KR kg 999.0000 118.52 118,400.00
Air Liter 215.0000 250.00 53,750.00
JUMLAH HARGA BAHAN 623,756.99
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 796,296.99
E Overhead & Profit 10% 10% 79,629.70
F Harga Satuan Pekerjaan (D+E) 875,926.00
A.4.1.1.1 Kanstein UK. 8.40.20

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.2000 80,000 16,000.00
Tukang Batu L.02 OH 0.1500 100,000 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000 1,650.00
Mandor L.04 OH 0.0080 120,000 960.00
JUMLAH TENAGA KERJA 33,610.00
B BAHAN
Kanstein m' 2.5000 21,600 54,000.00
Spesi Sambungan kg 1.8900 1,175 2,220.75
Adukan Alas (Floor) m2 0.0100 60,793 607.93
JUMLAH HARGA BAHAN 56,828.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 90,438.68
E Overhead & Profit 10% 10% 9,043.87
F Harga Satuan Pekerjaan (D+E) 99,482.00
Menggunakan Molen K-300 Jumla
h
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)

(Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 ###
2 Tukang Batu L.02 OH 0.1890 100,000.00 ###
3 Kepala Tukang L.03 OH 0.0190 110,000.00 ###
4 Mandor L.04 OH 0.1320 120,000.00 ###
Jumlah Harga Tenaga Kerja ###
B. Bahan
1 PC / Portland Cement M.15 kg 413.0000
8.2600 58,750.00 ###
2 PB / Pasir Beton M.14.a kg 681.0000
m3 0.4422 160,000.00 ###
3 Kr / Kerikil M.12 kg 1,021.0000
m3 0.5834 160,000.00 ###
4 Air M.02 L 215.0000
m3 0.2150 25,000.00 ###
Jumlah Harga Bahan ###
C. Peralatan
1 Molen E.28.b Sewa-hari 0.2500 200,000.00 ###
Jumlah Harga Peralatan ###
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) ###
E. Overhead + Profit (10%) 10% x D ###
F. Harga Satuan Pekerjaan per-m2 (D+E) ###
1 m3 beton mutu f'c = 31.2 Mpa (K300) menggunakan ready mixed dan bahan aditif Jumla
h
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)

(Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000 80,000 ###
2 Tukang Batu L.02 OH 0.250 100,000 ###
3 Kepala Tukang L.03 OH 0.025 110,000 ###
4 Mandor L.04 OH 0.100 120,000 ###
Jumlah Harga Tenaga Kerja ###
B. Bahan
1 Campuran Beton Ready Mixed M.09.x m 2
1.00 932,164.00 ###
Jumlah Harga Bahan ###
C. Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.120 0.00
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) ###
E. Overhead + Profit (10%) 10% x D ###
F. Harga Satuan Pekerjaan per-m2 (D+E) ###
A.4.1.1.1 Buis Beton Dia. 30 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.2000 80,000 16,000.00
Mandor L.04 OH 0.0200 120,000 2,400.00
JUMLAH TENAGA KERJA 18,400.00
B BAHAN
Buis Beton Dia. 30 cm m' 1.0000 32,000 32,000.00
Spesi Sambungan kg 0.3800 1,175 446.50
JUMLAH HARGA BAHAN 32,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 50,400.00
E Overhead & Profit 10% 10% 5,040.00
F Harga Satuan Pekerjaan (D+E) 55,440.00
A.4.1.1.1 Gorong-gorong dia. 60 cm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01 OH 0.2000 80,000 16,000.00
Mandor L.04 OH 0.0200 120,000 2,400.00
JUMLAH TENAGA KERJA 18,400.00
B BAHAN
Gorong-gorong dia. 60 cm m' 1.0000 92,000 92,000.00

JUMLAH HARGA BAHAN 92,000.00


C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 110,400.00
E Overhead & Profit 10% 10% 11,040.00
F Harga Satuan Pekerjaan (D+E) 121,440.00
Grill penutup saluran, besi siku 50.50.5 + plat strip

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.3000 80,000.00 24,000.00
2 Tukang Batu L.02 OH 0.3000 100,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.1000 110,000.00 11,000.00
4 Mandor L.04 OH 0.0150 120,000.00 1,800.00
66,800.00
B BAHAN
1 Plat Strip 3 x 30 x 6 M M 3.0000 2,366.67 7,100.00
2 Besi Siku 40.40.4 M 2.6000 36,250.00 94,250.00
101,350.00
C PERALATAN
-
D Jumlah (A+B+C) 168,150.00
E Overhead & Profit 10% x D 16,815.00
F Harga Satuan Pekerjaan (D+E) 184,965.00
Waterproofing (membrane) T=3 mm

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
1 Pekerja L.01 OH 0.5000 80,000.00 40,000.00
2 Mandor L.02 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 40,600.00
B BAHAN
1 Material Primer bitumen kg 0.3000 68,000.00 20,400.00
2 Water proofing (membrane) t= 3 mm Roll 1.0500 125,000.00 131,250.00
3 Alat Bantu Ls 1.0000 11,373.75 11,373.75
JUMLAH HARGA BAHAN 163,023.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 203,623.75
E Overhead & Profit (Contoh 15%) 10% x D 20,362.38
F Harga Satuan Pekerjaan (D+E) 223,986.13
BARAK PANJANG
Jenis Pekerjaan : Pintu type PJ1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen UPVC m1 16.5000 121,000.00 1,996,500.00
2 Frame m1 24.3800 121,000.00 2,949,980.00
3 Kaca polos t=6 mm m2 8.2700 114,450.60 946,506.46
4 Sealent kusen & dinding m' 9.4700 5,000.00 47,350.00
5 Engsel pintu bh 6.0000 25,000.00 150,000.00
6 Engsel jendela bh 12.0000 25,000.00 300,000.00
7 Hak angin bh 6.0000 50,000.00 300,000.00
8 Handle pintu set 2.0000 200,000.00 400,000.00
9 Pengunci set 1.0000 150,000.00 150,000.00
10 Grendel jendela bh 6.0000 50,000.00 300,000.00
11 Grendel pintu atas set 1.0000 50,000.00 50,000.00
12 Sanblas m2 8.2700 15,000.00 124,050.00
13 Door Stoper bh 2.0000 65,000.00 130,000.00

Harga Satuan Pekerjaan 7,844,386.46


Overhead & profit 10% 8,628,825.11
Dibulatkan 8,628,800.00
Jenis Pekerjaan : Pintu type PJ2
Acuan :
No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
1 Kusen UPVC m1 13.9400 121,000.00 1,686,740.00
2 Frame m1 24.3800 121,000.00 2,949,980.00
3 Kaca polos t=6 mm m2 8.2700 114,450.60 946,506.46
4 Sealent kusen & dinding m' 9.4700 5,000.00 47,350.00
5 Engsel pintu bh 6.0000 25,000.00 150,000.00
6 Engsel jendela bh 8.0000 25,000.00 200,000.00
7 Hak angin bh 4.0000 50,000.00 200,000.00
8 Handle pintu set 2.0000 200,000.00 400,000.00
9 Pengunci set 1.0000 150,000.00 150,000.00
10 Grendel jendela bh 4.0000 50,000.00 200,000.00
11 Grendel pintu atas set 1.0000 50,000.00 50,000.00
12 Sanblas m2 8.2700 15,000.00 124,050.00
13 Door Stoper bh 2.0000 65,000.00 130,000.00

Harga Satuan Pekerjaan 7,234,626.46


Overhead & profit 10% 7,958,089.11
Dibulatkan 7,958,000.00
Jenis Pekerjaan : Pintu type P3
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen UPVC m1 6.0000 121,000.00 726,000.00
2 Frame m1 6.1080 121,000.00 739,068.00
3 Kaca polos t=6 mm m2 2.3441 114,450.60 268,281.36
4 Sealent kusen & dinding m' 6.0000 5,000.00 30,000.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Handle pintu set 1.0000 200,000.00 200,000.00
7 Pengunci set 1.0000 150,000.00 150,000.00
8 Sanblas m2 2.3441 15,000.00 35,161.20
9 Door Stoper bh 1.0000 65,000.00 65,000.00

Harga Satuan Pekerjaan 2,288,510.56


Overhead & profit 10% 2,517,361.62
Dibulatkan 2,517,300.00
Jenis Pekerjaan : Pintu UPVC type PT
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Pintu UPVC Lengkap unit 1.0000 845,600.00 845,600.00

UPAH
1 Pemasangan Pintu unit 1.0000 295,960.00 295,960.00

Harga Satuan Pekerjaan 1,141,560.00


Overhead & profit 10% 1,255,716.00
Dibulatkan 1,255,700.00
Jenis Pekerjaan : Pintu type P2
Acuan :
No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
1 Kusen aluminium m' 8.5600 121,000.00 1,035,760.00
2 Daun pintu enggineering door uk.0,58x2.1 m2 3.2960 952,380.95 3,139,047.61
3 Sealent kusen & dinding m' 6.6800 5,000.00 33,400.00
4 Engsel pintu bh 6.0000 25,000.00 150,000.00
5 Handle pintu bh 2.0000 200,000.00 400,000.00
6 Pengunci set 1.0000 150,000.00 150,000.00

Harga Satuan Pekerjaan 4,908,207.61


Overhead & profit 10% 490,820.76
Dibulatkan 5,399,028.37
Jenis Pekerjaan : Pintu type PS
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen UPVC m' 3.5000 121,000.00 423,500.00
2 Daun pintu UPVC bh 1.0000 1,500,000.00 1,500,000.00
3 Sealent kusen & dinding m' 3.6600 5,000.00 18,300.00
4 Engsel pintu bh 3.0000 25,000.00 75,000.00
5 Handle pintu + pengunci set 1.0000 350,000.00 350,000.00

Harga Satuan Pekerjaan 2,366,800.00


Overhead & profit 10% 2,603,480.00
Dibulatkan 2,603,400.00
Jenis Pekerjaan : Jendela type J1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen UPVC m' 13.6200 121,000.00 1,648,020.00
2 Selimar UPVC DAUN JENDELA m' 12.5440 121,000.00 1,517,824.00
3 Casement bh 8.0000 50,000.00 400,000.00
4 Handel casement bh 4.0000 42,350.00 169,400.00
5 Kaca bening t=6 mm m2 2.4358 114,450.60 278,774.19
6 Sealent kusen & dinding m' 6.8800 5,000.00 34,400.00
7 Engsel jendela bh 8.0000 25,000.00 200,000.00

Harga Satuan Pekerjaan 4,248,418.19


Overhead & profit 10% 4,673,260.01
Dibulatkan 4,673,200.00
Jenis Pekerjaan : Jendela type J2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen UPVC m' 13.6200 120,741.50 1,644,499.23
2 Selimar UPVC m' 4.0600 150,991.50 613,025.49
3 Kaca bening t=6 mm m2 1.8865 114,450.60 215,913.35
4 Sealent kusen & dinding m' 6.8800 5,000.00 34,400.00
5 Engsel jendela bh 4.0000 25,000.00 100,000.00
6 Casemen bh 4.0000 50,000.00 200,000.00
7 Handel Casemen bh 2.0000 42,350.00 84,700.00

Harga Satuan Pekerjaan 2,892,538.07


Overhead & profit 10% 3,181,791.87
Dibulatkan 3,181,700.00
Jenis Pekerjaan : Jendela type GR-1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Glass Block m2 0.3600 1,051,400.00 378,504.00
2 Roster m2 0.2400 333,600.00 80,064.00

Harga Satuan Pekerjaan 458,568.00


Overhead & profit 10% 45,856.80
Dibulatkan 504,424.80
Jenis Pekerjaan : Glassblock type GB1
Acuan :
No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
1 Glass Block m2 0.8000 1,051,400.00 841,120.00

Harga Satuan Pekerjaan 841,120.00


Overhead & profit 10% 84,112.00
Dibulatkan 925,232.00
Jenis Pekerjaan : Pasang Glass Block 20/20 perm2
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Glass Block bh 25.0000 36,000.00 900,000.00
2 Semen kg 12.8000 1,175.00 15,040.00
3 Pasir Pasang m3 0.0350 160,000.00 5,600.00
UPAH
1 Pekerja Or Hr 0.3000 80,000.00 24,000.00
2 Tukang Or Hr 0.1000 100,000.00 10,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.0010 120,000.00 120.00
Harga Satuan Pekerjaan 955,860.00
Overhead & profit 10% 1,051,446.00
Dibulatkan 1,051,400.00
Jenis Pekerjaan : Railling type R2
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Railling hollow 4/4 & 2/4 m2 2.7060 403,200.00 1,091,059.20

Harga Satuan Pekerjaan 1,091,059.20


Overhead & profit 10% 1,200,165.12
Dibulatkan 1,200,100.00
Jenis Pekerjaan : Railling type R1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Railling hollow 4/4 & 2/4 m2 1.2760 403,200.00 514,483.20

Harga Satuan Pekerjaan 514,483.20


Overhead & profit 10% 565,931.52
Dibulatkan 565,900.00
Jenis Pekerjaan : Jendela type GB-1
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Glass Block m2 0.8000 1,051,400.00 841,120.00

Harga Satuan Pekerjaan 841,120.00


Overhead & profit 10% 925,232.00
Dibulatkan 925,200.00
Pemasangan KusenPintu Baja type PD unit

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.0500 80,000 84,000.00
Tukang besi L.02 OH 0.3780 100,000 37,800.00
Kepala tukang L.03 OH 0.0378 110,000 4,158.00
Mandor L.04 OH 0.0019 120,000 224.64
JUMLAH TENAGA KERJA 126,182.64
B BAHAN
Kusen rangka UNP 100x50x5x7.5 kg 37.4400 14,000.00 524,160.00
Daun Pintu Baja T=1,5 mm kg 104.1667 14,000.00 1,458,333.33
Rangka pintu besi siku 40x40x2 kg 22.6967 14,000.00 317,753.33
Level handle pintu baja psg 1.0000 144,000.00 144,000.00
HD non panic swing bh 1.0000 428,000.00 428,000.00
D. cylinder bh 1.0000 100,000.00 100,000.00
Engsel/hinges psg 1.5000 73,600.00 110,400.00
Cat Meni besi m2 8.0960 23,608.00 191,130.37
JUMLAH HARGA BAHAN 3,273,777.03
C PERALATAN
Alat 2 % 5.000 163,688.85
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 3,563,648.53
E Overhead + Profit (Contoh 15%) 10% x D 10% 356,364.85
F Harga Satuan Pekerjaan (D+E) 3,920,100.00
Jenis Pekerjaan : Pkerjaan GRC Panel Motif t= 5 cm /m2
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Serat Fiber kg 0.0600 36,000.00 2,160.00
2 Semen kg 3.6000 1,175.00 4,230.00
3 agregat halus m3 0.2400 240,000.00 57,600.00
4 Molding m2 1.0000 191,970.00 191,970.00
Bahan Lainnya ls 1.0000 38,394.00 38,394.00

UPAH
1 Pekerja Or Hr 1.5000 80,000.00 120,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0150 110,000.00 1,650.00
4 Mandor Or Hr 0.0015 120,000.00 180.00

PERALATAN
Alat 2 % 0.0500 14,717.70 735.89

Harga Satuan Pekerjaan 431,919.89


jumlah 431,919.89
Dibulatkan 431,900.00
Jenis Pekerjaan : Jendela type JOW
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 GRC Panel Motif m2 1.7500 1,051,400.00 1,839,950.00

2 Pengecatan m2 3.5000 36,389.10 127,361.85

Harga Satuan Pekerjaan 1,967,311.85


Overhead & profit 10% 2,164,043.04
Dibulatkan 2,164,000.00
Jenis Pekerjaan : Jendela type 0W
Acuan :
No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
1 GRC Panel Motif m2 1.0000 1,051,400.00 1,051,400.00

2 Pengecatan m2 2.0000 36,389.10 72,778.20

Harga Satuan Pekerjaan 1,124,178.20


Overhead & profit 10% 1,236,596.02
Dibulatkan 1,236,500.00
Glassblock 20 x 20, Type RB1
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0000 80,000.00 80,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 243,500.00
B BAHAN
Glass block 20 x 20 mm bh 14.0000 36,000.00 504,000.00
Roster 20 x 20 bh 14.0000 9,900.00 138,600.00
Taliair m' 3.6000 21,260.63 76,538.25
JUMLAH HARGA BAHAN 719,138.25
C PERALATAN
Alat bantu ls 8,500.00 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 962,638.25
Overhead & profit 10% 96,263.83
Dibulatkan 1,058,902.08
Glassblock 20 x 20, Type RB2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.1000 80,000.00 88,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 251,500.00
B BAHAN
Glass block 20 x 20 mm bh 3.0000 36,000.00 108,000.00
Roster 20 x 20 bh 6.0000 9,900.00 59,400.00
Taliair m' 2.4000 21,260.63 51,025.50
JUMLAH HARGA BAHAN 218,425.50
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 469,925.50
Overhead & profit 10% 46,992.55
Dibulatkan 516,918.05
Glassblock 20 x 20, Type RB4

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Glass block 20 x 20 mm bh 8.0000 36,000.00 288,000.00
Roster 20 x 20 bh 8.0000 9,900.00 79,200.00
Taliair m' 3.2000 21,260.63 68,034.00
JUMLAH HARGA BAHAN 435,234.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 718,734.00
Overhead & profit 10% 71,873.40
Dibulatkan 790,607.40
Glassblock 20 x 20, Type RB5

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.6000 80,000.00 128,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 291,500.00
B BAHAN
Glass block 20 x 20 mm bh 6.0000 36,000.00 216,000.00
Roster 20 x 20 bh 3.0000 9,900.00 29,700.00
Taliair m' 2.4000 21,260.63 51,025.50
JUMLAH HARGA BAHAN 296,725.50
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -

Harga Satuan Pekerjaan 588,225.50


Overhead & profit 10% 58,822.55
Dibulatkan 647,048.05
Glassblock 20 x 20, Type RB6

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Glass block 20 x 20 mm bh - 36,000.00 -
Roster 20 x 20 bh 20.0000 9,900.00 198,000.00
Taliair m' 6.0000 21,260.63 127,563.75
JUMLAH HARGA BAHAN 325,563.75
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 609,063.75
Overhead & profit 10% 60,906.38
Dibulatkan 669,970.13
Roster 20 x 20, Type RB7

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 16.0000 9,900.00 158,400.00
JUMLAH HARGA BAHAN 158,400.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -

Harga Satuan Pekerjaan 441,900.00


Overhead & profit 10% 44,190.00
Dibulatkan 486,090.00
Roster 20 x 20, Type RS2

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 90.0000 9,900.00 891,000.00
JUMLAH HARGA BAHAN 891,000.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 1,174,500.00
Overhead & profit 10% 117,450.00
Dibulatkan 1,291,950.00
Roster 20 x 20, Type RS3

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 70.0000 9,900.00 693,000.00
JUMLAH HARGA BAHAN 693,000.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 976,500.00
Overhead & profit 10% 97,650.00
Dibulatkan 1,074,150.00
Roster 20 x 20, Tidak Ada di datail Lokasi Roof

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 20.0000 9,900.00 198,000.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 481,500.00
Overhead & profit 10% 48,150.00
Dibulatkan 529,650.00
Pasang Railing TYPE R (uk. 0,815m x t.1,1m), by specialist

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A UPAH & MATERIAL


Railing besi + finishing m2 0.8965 403,200.00 361,468.80
JUMLAH UPAH & MATERIAL 361,468.80
B PERALATAN
Alat bantu ls 0.0500 18,073.44 903.67
JUMLAH HARGA ALAT 903.67
Harga Satuan Pekerjaan 362,372.47
Overhead & profit 10% 36,237.25
Dibulatkan 398,609.72
Pasang Railing TYPE R1 (uk. 1,15m x t.1,1m) by specialist

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A UPAH & MATERIAL


Railing besi + finishing m2 1.2650 403,200.00 510,048.00
JUMLAH UPAH & MATERIAL 510,048.00
B PERALATAN
Alat bantu ls 0.0500 25,502.40 1,275.12
JUMLAH HARGA ALAT 1,275.12
Harga Satuan Pekerjaan 511,323.12
Overhead & profit 10% 51,132.31
Dibulatkan 562,455.43
Pasang Railing TYPE R2 (uk. 1,88m x t.1,1m), by specialist

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A UPAH & MATERIAL


Railing besi + finishing m2 2.0680 403,200.00 833,817.60
JUMLAH UPAH & MATERIAL 833,817.60
B PERALATAN
Alat bantu ls 0.0500 41,690.88 2,084.54
JUMLAH HARGA ALAT 2,084.54
Harga Satuan Pekerjaan 835,902.14
Overhead & profit 10% 83,590.21
Dibulatkan 919,492.36
Pasang Railing TYPE R3 (uk. 1,88m x t.1,m), by specialist

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A UPAH & MATERIAL


Railing besi + finishing m2 2.0680 403,200.00 833,817.60
JUMLAH UPAH & MATERIAL 833,817.60
B PERALATAN
Alat bantu ls 0.0500 41,690.88 2,084.54
JUMLAH HARGA ALAT 2,084.54

Harga Satuan Pekerjaan 835,902.14


Overhead & profit 10% 83,590.21
Dibulatkan 919,492.36
Pasang Railing BESI T.1,M, PER M1, by specialist

No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A UPAH & MATERIAL


Railing besi + finishing m1 1.0000 403,200.00 403,200.00
JUMLAH UPAH & MATERIAL 403,200.00
B PERALATAN
Alat bantu ls 0.0500 20,160.00 1,008.00
JUMLAH HARGA ALAT 1,008.00
Harga Satuan Pekerjaan 404,208.00
Overhead & profit 10% 40,420.80
Dibulatkan 444,628.80
Jenis Pekerjaan : 1 M2 Pintu besi plat baja tebal 2 mm rangkap, rangka baja siku

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Besi siku L Kg 15.0000 36,250.00 543,750.00
2 Besi plat baja Kg 32.8000 36,250.00 1,189,000.00
3 Kawat las Kg 0.0500 55,000.00 2,750.00

UPAH
1 Tukang Las Oh 0.2000 100,000.00 20,000.00
2 Kepala Tukang Oh 0.0200 110,000.00 2,200.00
3 Mandor Oh 0.0010 120,000.00 120.00
Jumlah 1,757,820.00
Dibulatkan 1,757,820.00
Jenis Pekerjaan : 1 unit pintu Besi / PB 7, ukuran 82 cm x 2,1m

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Pintu Besi m2 1.6680 1,757,820.00 2,932,043.76
2 Handle Besi & pengunci bh 2.0000 280,000.00 560,000.00
3 Engsel Besi bh 3.0000 68,000.00 204,000.00
4 Kusen Besi hollow 60.60 kg 19.4712 36,250.00 705,831.00
6 Plat besi utk louvre kg 4.4160 36,250.00 160,080.00
7 Cat Duco kg 0.9500 41,600.00 39,520.00

UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
Harga Satuan Pekerjaan 4,768,996.19
Overhead & profit 10% 476,899.62
Dibulatkan 5,245,895.81
Jenis Pekerjaan : 1 M1 Talang Air Zincalum t= 0,35mm

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
A UPAH
1 Pekerja Oh 0.2000 80,000.00 16,000.00
2 Tukang Talang Oh 0.0200 100,000.00 2,000.00
2 Kepala Tukang Oh 0.0020 110,000.00 220.00
3 Mandor Oh 0.0002 120,000.00 24.00
JUMLAH UAPAH 18,244.00
B BAHAN
1 Plat Talang Zincalum t= 0,35 mm m 1.1000 49,600.00 54,560.00
2 Besi plat baja 2mm Kg 1.1513 36,250.00 41,735.83
JUMLAH BAHAN 96,295.83

C PERALATAN
Alat bantu ls 0.0500 9,629.58 481.48
JUMLAH HARGA ALAT 481.48
Harga Satuan Pekerjaan 115,021.31
Overhead & profit 10% 11,502.13
Dibulatkan 126,523.44

Jenis Pekerjaan : Pasang Atap Transparant UPVC per m2


Acuan : Modifikasi

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Atap Transparant lebar 0,78m m' 1.3000 223,728.81 290,847.45
2 Skrup + roof seal utk UPVC Roofing buah 4.0000 320.00 1,280.00

UPAH
1 Pekerja Or Hr 0.1500 80,000.00 12,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0800 110,000.00 8,800.00
4 Mandor Or Hr 0.0060 120,000.00 720.00

Harga Satuan Pekerjaan 328,647.45


10% Overhead & profit 10% 32,864.75
Dibulatkan 361,512.20
Jenis Pekerjaan : Pasang Atap Transparant UPVC per m2
Acuan : Modifikasi

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
A UPAH
1 Pekerja Oh 0.1500 80,000.00 12,000.00
2 Tukang Talang Oh 0.1500 100,000.00 15,000.00
2 Kepala Tukang Oh 0.0800 110,000.00 8,800.00
3 Mandor Oh 0.0060 120,000.00 720.00
JUMLAH UAPAH 36,520.00
B BAHAN
1 Atap Transparant lebar 0,78m m' 1.3000 223,728.81 290,847.45
2 Skrup + roof seal utk UPVC Roofing buah 4.0000 320.00 1,280.00
JUMLAH BAHAN 292,127.45
C PERALATAN
Alat bantu ls 0.0500 14,606.37 730.32
JUMLAH HARGA ALAT 730.32

Harga Satuan Pekerjaan 329,377.77


Overhead & profit 10% 32,937.78
Dibulatkan 362,315.55

1 buah Lemari Surat

No Uraian Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

A TENAGA
Pekerja OH 1.00 80,000 80,000.00
Tukang Kayu OH 1.00 100,000 100,000.00
Kepala Tukang Kayu OH 0.10 110,000 11,000.00
Tukang Cat dan Tulis OH 1.50 100,000 150,000.00
Mandor OH 0.10 120,000 12,000.00
JUMLAH TENAGA KERJA 353,000.00
B BAHAN
multipleks tebal 18mm lbr 66.25 200,000 13,250,000.00
Ensel bh 120.00 25,000 3,000,000.00
Kunci bh 60.00 4,000 240,000.00
Paku campuran kg 3.25 14,000 45,500.00
cat kayu kg 4.50 41,600 187,200.00
JUMLAH HARGA BAHAN 16,722,700.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,075,700.00
E Overhead & Profit (Contoh 15 %) 10% x D 1,707,570.00
F Harga Satuan Pekerjaan (D+E) 18,783,270.00
Jenis Pekerjaan : Pek. Nama Ruangan 10x20 cm (acrylic)
Acuan : Modifikasi

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
A UPAH
1 Tukang Talang Oh 0.1500 100,000.00 15,000.00
JUMLAH UPAH 15,000.00
B BAHAN
1 ACRYLIC 3 MM – 4 x 8 BENING M2 0.0200 421,920.00 8,438.40
2 Cat Ls 1.0000 20,000.00 20,000.00
3 Lakban Kertas bh 1.0000 12,000.00 12,000.00
4 Pen acrylic bh 2.0000 3,200.00 6,400.00
JUMLAH BAHAN 46,838.40
C PERALATAN
Alat bantu ls 0.0500 2,341.92 117.10
JUMLAH HARGA ALAT 117.10

Harga Satuan Pekerjaan 61,955.50


Overhead & profit 10% 6,195.55
Dibulatkan 68,151.05
Jenis Pekerjaan : Pek. Nama Lantai 30x30 (acrylic)
Acuan : Modifikasi

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
A UPAH
1 Tukang Talang Oh 0.1500 100,000.00 15,000.00
JUMLAH UPAH 15,000.00
B BAHAN
1 ACRYLIC 3 MM – 4 x 8 BENING M2 0.0900 421,920.00 37,972.80
2 Cat Ls 1.0000 20,000.00 20,000.00
3 Lakban Kertas Ls 1.0000 12,000.00 12,000.00
4 Pen acrylic bh 4.0000 3,200.00 12,800.00
JUMLAH BAHAN 82,772.80
C PERALATAN
Alat bantu ls 0.0500 4,138.64 206.93
JUMLAH HARGA ALAT 206.93
Harga Satuan Pekerjaan 97,979.73
Overhead & profit 10% 9,797.97
Dibulatkan 107,777.71
Jenis Pekerjaan : Pek. Papan Informasi Denah Bangunan 60x120 cm (acrylic)
Acuan : Modifikasi

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
A UPAH
1 Tukang Talang Oh 0.1500 100,000.00 15,000
JUMLAH UPAH 15,000.00
B BAHAN
1 ACRYLIC 3 MM – 4 x 8 BENING M2 0.7200 421,920 303,782
2 Cat Ls 1.0000 20,000 20,000
3 Lakban Kertas Ls 1.0000 12,000 12,000
4 Pen acrylic bh 6.0000 3,200 19,200
JUMLAH BAHAN 354,982
C PERALATAN
Alat bantu ls 0.0500 17,749 887
JUMLAH HARGA ALAT 887
Harga Satuan Pekerjaan 370,870
Overhead & profit 10% 37,086.99
Dibulatkan 407,956.84

HARGA SATUAN PEKERJAAN ALUMUNIUM COMPOSITE PANEL ( ACP ) / M2

Harga Satuan Jumlah Harga


No. Uraian Kode Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja L.01 OH 0.3000 80,000.00 24,000.00
Tukang Besi / Las L.03 OH 0.6000 100,000.00 60,000.00
Kepala Tukang L.03 OH 0.0600 110,000.00 6,600.00
Mandor L.04 OH 0.0060 120,000.00 720.00
JUMLAH TENAGA KERJA 91,320.00
B. BAHAN
Alumunium Composite Pabel ( ACP ) Motif m2 1.0000 1,182,500.00 1,182,500.00
Hollow besi galvanis 40x40x1,2 mm Btg 0.5000 198,000.00 99,000.00
Bracket Siku / Stifner Btg 0.2670 75,000.00 20,025.00
Paku beton Kg 0.0800 15,000.00 1,200.00
Paku Sekrup Kg 0.1100 14,000.00 1,540.00
Sealent tube 0.2500 50,000.00 12,500.00

JUMLAH HARGA BAHAN 1,316,765.00


C. PERALATAN
Alat Bantu Ls 1.0000 30,000.00 30,000.00
-
JUMLAH HARGA ALAT 30,000.00
D. Jumlah ( A+B+C) 1,438,085.00
E. Profit 10% *D 143,808.50
F. Harga Satuan Pekerjaan (D+E) 1,581,893.50
G. Dibulatkan 1,581,893.00
Profit 10%

1.1 jangan dihapus

konsinyasi 19 Okt 018

konsinyasi 19 Okt 018


Jenis Pekerjaan : Memasang 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Acuan : Modifikasi/ Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.1.26

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Bata ringan tebal 10 cm bh 8.4 7,200 60,480
2 Mortar siap pakai Kg 3.15 1,800 5,670
UPAH
1 Pekerja OH 0.3 80,000 24,000
2 Tukang Batu OH 0.1 100,000 10,000
3 Kepala Tukang OH 0.01 110,000 1,100
4 Mandor OH 0.01 120,000 1,200
Harga Satuan Pekerjaan 102,450
Overhead & profit 10% 112,695
Dibulatkan 112,600
0.0324
30.8641975309

plester
tambahan Analisa

plesteran
Jenis Pekerjaan : Membuat 1 m' Kolom 12x25+ perapihan
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.1.1.35

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 Kayu klas III m3 0.002 1,000,000 2,000
Paku 5-12 cm kg 0.01 15,000 150
Besi beton polos kg 5.4915 11,000 60,407
Kawat beton kg 0.45 20,000 9,000
Semen Portland kg 9.92 1,175 11,656
Pasir beton m3 0.019 160,000 3,040
Kerikil m3 0.023 160,000 3,680
-
UPAH -
1 Pekerja OH 0.18 80,000 14,400
2 Tukang Batu OH 0.02 100,000 2,000
3 Tukang kayu OH 0.02 100,000 2,000
4 Tukang besi OH 0.02 100,000 2,000
5 Kepala Tukang OH 0.006 110,000 660
6 Mandor OH 0.009 120,000 1,080
Harga Satuan Pekerjaan 112,073
Overhead & profit 10% 123,280
Dibulatkan 123,200
Jenis Pekerjaan : Membuat 1 m' Kolom 15x15

Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.1.1.35


No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Kayu klas III m3 0.002 1,000,000 2,000
Paku 5-12 cm kg 0.01 15,000 150
Besi beton polos kg 5 11,000 55,000
Kawat beton kg 0.45 20,000 9,000
Semen Portland kg 4 1,175 4,700
Pasir beton m3 0.006 160,000 960

Kerikil m3 0.009 160,000 1,440

UPAH
1 Pekerja OH 0.18 80,000 14,400
2 Tukang Batu OH 0.02 100,000 2,000
3 Tukang kayu OH 0.02 100,000 2,000
4 Tukang besi OH 0.02 100,000 2,000
5 Kepala Tukang OH 0.006 110,000 660
6 Mandor OH 0.009 120,000 1,080
Harga Satuan Pekerjaan 95,390
Overhead & profit 10% 104,929
Dibulatkan 104,900
14.4
oke, Konsinyasi

edit harga satuan

oke, Konsinyasi
6.25

konsinyasi 19 Okt

konsinyasi 19 Okt

6.25

konsinyasi 19 Okt
Jenis Pekerjaan : memasang 1 m2 lantai keramik TACTILE ukuran ( 40 x 40 ) cm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.8

No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah

1 2 3 4 5 6
BAHAN
1 keramik tactile bh 12.0000 14,400.00 172,800.00
2 Semen PC kg 10.0000 1,175.00 11,750.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.7000 80,000.00 56,000.00
2 Tukang batu OH 0.3500 100,000.00 35,000.00
3 Kepala Tukang OH 0.0350 110,000.00 3,850.00
4 Mandor OH 0.0350 120,000.00 4,200.00
Harga Satuan Peke 295,800.00
Overhead & profit 29,580.00
Dibulatkan 325,380.00
25

25
Jenis Pekerjaan : Pemasangan 1 m1 Drop Ceiling, gypsumboard t=9 mm (20m & 15cm)
Acuan : TAMBAHAN ANALISA

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Gypsumboard lbr 0.118 58,520 6,881
2 Paku skrup Kg 0.1 15,000 1,500
UPAH
1 Pekerja Or Hr 0.035 80,000 2,800
2 Tukang Kayu Or Hr 0.0175 100,000 1,750
3 Kepala Tukang Kayu Or Hr 0.175 110,000 19,250
4 Mandor Or Hr 0.175 120,000 21,000

Harga Satuan Peke 53,181


Overhead & profit 58,499
Dibulatkan 58,400

Jenis Pekerjaan : 1 M1 Pasang Drop Ceiling Gypsum Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan : TAMBAHAN ANALISA

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.20.2 mm m' 2.875 12,000 34,500

2 Assc ls 100%x rangka 34,500 34,500


UPAH
1 Pekerja Or Hr 0.1225 80,000 9,800
2 Tukang besi Or Hr 0.1225 100,000 12,250
3 Kepala Tukang Or Hr 0.01225 110,000 1,348
4 Mandor Or Hr 0.0063 120,000 756

Harga Satuan Peke 93,154


Overhead & profit 102,469
Dibulatkan 102,400
Acuan :
No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Rangka furing channel m' 2.4 11,389 27,334 11,389.34
2 Rangka metal furing m' 2.4 13,168.75 31,605 13,168.75
2 Assc ls 30%x rangka 58,939 17,682
UPAH
1 Pekerja Or Hr 0.175 80,000 14,000 34,505
2 Tukang besi Or Hr 0.175 100,000 17,500
3 Kepala Tukang Or Hr 0.0175 110,000 1,925 ganti koefisien
4 Mandor Or Hr 0.009 120,000 1,080

Harga Satuan Pekerjaan 111,126


Overhead & profit 10% 122,239
Dibulatkan 122,200
Jenis Pekerjaan : 1 M2 Pasang Drop Ceiling Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 9.765 14,000 136,710
2 Paku skrup Kg 0.225 14,000 3,150
UPAH
1 Pekerja Or Hr 0.35 80,000 28,000
2 Tukang besi Or Hr 0.35 100,000 35,000
3 Kepala Tukang Or Hr 0.035 110,000 3,850
4 Mandor Or Hr 0.018 120,000 2,160

Harga Satuan Pekerjaan 208,870


Overhead & profit 10% 229,757
Dibulatkan 229,700
Jenis Pekerjaan : Pemasangan 1 m2 langit-langit, beton expose
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 sement Aci kg 3.25 1,400 4,550
2 Kg 0.11 - -
UPAH
1 Pekerja Or Hr 0.1 80,000 8,000
2 Tukang Kayu Or Hr 0.05 100,000 5,000
3 Kepala Tukang Kayu Or Hr 0.005 110,000 550
4 Mandor Or Hr 0.005 120,000 600

Harga Satuan Pekerjaan 18,700


Overhead & profit 10% 20,570
Dibulatkan 20,500

Jenis Pekerjaan : 1 M2 Pasang Drop Ceiling Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 9.765 14,000 136,710
2 Paku skrup Kg 0.225 14,000 3,150
UPAH
1 Pekerja Or Hr 0.35 80,000 28,000
2 Tukang besi Or Hr 0.35 100,000 35,000
3 Kepala Tukang Or Hr 0.035 110,000 3,850
4 Mandor Or Hr 0.018 120,000 2,160

Harga Satuan Pekerjaan 208,870


Overhead & profit 10% 229,757
Dibulatkan 229,700
Jenis Pekerjaan : 1 M' Cover air Hujan Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 5.628 14,000 78,792
2 Paku skrup Kg 0.15 14,000 2,100
UPAH
1 Pekerja Or Hr 0.175 80,000 14,000
2 Tukang besi Or Hr 0.175 100,000 17,500
3 Kepala Tukang Or Hr 0.0175 110,000 1,925
4 Mandor Or Hr 0.009 120,000 1,080

Harga Satuan Pekerjaan 115,397


Overhead & profit 10% 126,937
Dibulatkan 126,900
Jenis Pekerjaan : Pasang Atap genteng metal Berpasir
Acuan : Modifikasi/Permen PUPR No. 28 2016 AHSP Cipta KaryaA.4.5.2.41

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Genteng metal berpasir m2 1 128,000 128,000
2 Skrup buah 9 750 6,750
3 Insulasi powder m2 6,000 -
UPAH
1 Pekerja Or Hr 0.15 80,000 12,000
2 Tukang Or Hr 0.15 100,000 15,000
3 Kepala Tukang Or Hr 0.08 110,000 8,800
4 Mandor Or Hr 0.006 120,000 720

Harga Satuan Peke 171,270


Overhead & profit 188,397
Dibulatkan 188,300
Jenis Pekerjaan : Pemasangan 1 m2 dinding partisi, grc t=4mm
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 grc bord 4mm lbr 0.364 60,000 21,840
2
3 Paku skrup Kg 0.2 14,000 2,800
UPAH
1 Pekerja Or Hr 0.1 80,000 8,000
2 Tukang Kayu Or Hr 0.05 100,000 5,000
3 Kepala Tukang Kayu Or Hr 0.005 110,000 550
4 Mandor Or Hr 0.005 120,000 600

Harga Satuan Peke 38,790


Overhead & profit 42,669
Dibulatkan 42,600
tambahan analisa
tambahan analisa

tambahan analisa
tambahan analisa

Pemasangan shower
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 80,000 800.00
2 Tukang batu L.02 OH 0.100 100,000 10,000.00
3 Kepala tukang L.03 OH 0.010 110,000 1,100.00
4 Mandor L.04 OH 0.005 120,000 600.00
JUMLAH TENAGA KERJA 12,500.00
B BAHAN
1 Kran Shower Unit 1.000 226,400.00 226,400.00
2 Seal tape Bh 0.025 12,800.00 320.00
JUMLAH HARGA BAHAN 226,720.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 239,220.00
E Overhead & Profit (Contoh 10%) 10% x D 23,922.00
F Harga Satuan Pekerjaan (D+E) 263,142.00
edit link
delete kran

Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.5.1.1.19


No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Tisu Holder unit 1 355,000 355,000

UPAH
1 Pekerja Or Hr 0.01 80,000 800
2 Tukang Or Hr 0.4 100,000 40,000
3 Kepala Tukang Or Hr 0.04 110,000 4,400
4 Mandor Or Hr 0.005 120,000 600

Harga Satuan Pekerjaan 400,800


Overhead & profit 10% 440,880
Dibulatkan 440,800

Jenis Pekerjaan : Pemasangan 1 buah kran dia 1/2" atau 3/4"


Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.5.1.1.19

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kran Shower unit 1 250,000 250,000
2 Sealtipe bh 0.025 12,800 320
UPAH
1 Pekerja Or Hr 0.01 80,000 800
2 Tukang Or Hr 0.4 100,000 40,000
3 Kepala Tukang Or Hr 0.04 110,000 4,400
4 Mandor Or Hr 0.005 120,000 600

Harga Satuan Pekerjaan 296,120


Overhead & profit 10% 325,732
Dibulatkan 325,700
Jenis Pekerjaan : Pintu type P1'
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 7.12 120,742 859,679
2 Daun pintu enggineering door uk.0.82x2.1 unit 1 1,600,000 1,600,000
3 Selimar aluminium m' 0 150,992 -
4 Kaca polos t=5 mm m2 0.39 114,451 45,185
5 Sealent kusen & dinding m' 6 5,000 30,000
6 Engsel pintu bh 3 25,000 75,000
7 Handle pintu + pengunci set 1 200,000 200,000
8 Engsel jendela bh 0 25,000 -
9 Hak angin bh 0 50,000 -
10 Grendel jendela bh 0 50,000 -

Harga Satuan Peke 2,809,865


Overhead & profit 3,090,851
Dibulatkan 3,090,800
Jenis Pekerjaan : Railling pipa GIP dia 3"
:

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
2 Pipa GIP 3" m' 1.0500 91,740.00 96,327.00
3 Las Ls 1.0000 49,463.40 49,463.40
UPAH -
1 Pekerja Or Hr 0.0720 80,000.00 5,760.00
2 Tukang Besi Or Hr 0.0180 100,000.00 1,800.00
3 Tukang Las Or Hr 0.0180 100,000.00 1,800.00
4 Mandor Or Hr 0.0071 120,000.00 852.00
Harga Satuan Peke 156,002.40
Overhead & profit 15,600.24
Dibulatkan 171,602.64

Jenis Pekerjaan : Railling pipa GIP dia 2"


:
No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga
1 2 3 4 5 6
BAHAN
2 Pipa GIP 2" m' 1.0500 55,786.66 58,575.99
3 Las Ls 1.0000 49,463.40 49,463.40
UPAH -
1 Pekerja Or Hr 0.0720 80,000.00 5,760.00
2 Tukang Besi Or Hr 0.0180 100,000.00 1,800.00
3 Tukang Las Or Hr 0.0180 100,000.00 1,800.00
4 Mandor Or Hr 0.0071 120,000.00 852.00
Harga Satuan Peke 118,251.39
Overhead & profit 11,825.14
Dibulatkan 130,076.53
379,525.00

A.4.4.3.65. Pemasangan 1 m2 grass block

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A TENAGA
Pekerja L.01.01 OH 0.5000 80,000 40,000.00
Tukang Kayu L.02.04 OH 0.5000 100,000 50,000.00
Kepala tukang L.03.01 OH 0.0500 110,000 5,500.00
Mandor L.04.01 OH 0.0013 120,000 156.00
JUMLAH TENAGA KERJA 95,656.00
B BAHAN
Grass block M2 1.01 68,000 68,680.00
Pasir beton M3 0.07 160,000 11,200.00
JUMLAH HARGA BAHAN 79,880.00
C PERALATAN
Peralatan Kerja % 0.1000 96,040 9,604.00
JUMLAH HARGA ALAT 9,604.00
D Jumlah (A+B+C) 185,140.00
E Overhead & Profit 10% 10% 18,514.00
F Harga Satuan Pekerjaan (D+E) 203,654.00
1.130 2.5
2.5
0.065 2.3
0.735 2.3
0.200 3.45
2.130 4 8.520 3.45
16.5
0.880
0.880
0.585
0.585
2.930 2 5.860

0.37
0.37
0.88
0.88
2.5 4 10
24.380

2.5
2.5
1.7
1.7
2.77
2.77
13.94
Jenis Pekerjaan : Pintu UPVC type PT
Acuan :

No Uraian Kegiatan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Pintu UPVC Lengkap unit 1 845,600.00 845,600.00

UPAH
1 Pemasangan Pintu unit 1 295,960.00 295,960.00

Harga Satuan Peke 1,141,560.00


Overhead & profit 1,255,716.00
Dibulatkan 1,255,700.00
Jenis Pekerjaan : Pasang Glass Roster 20/20 perm2
Acuan :

No Uraian Kegiatan Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6
BAHAN
1 Roster bh 25 9,900 247,500
2 Semen kg 12.8 1,175 15,040
3 Pasir Pasang m3 0.035 160,000 5,600
UPAH
1 Pekerja Or Hr 0.3 80,000 24,000
2 Tukang Or Hr 0.1 100,000 10,000
3 Kepala Tukang Or Hr 0.01 110,000 1,100
4 Mandor Or Hr 0.001 120,000 120
Harga Satuan Peke 303,360
Overhead & profit 333,696
Dibulatkan 333,600
Pekerjaan Tali air
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.075 80,000 6,000.00
Tukang batu L.02 OH 0.056 100,000 5,625.00
Kepala tukang L.03 OH 0.056 110,000 6,187.50
Mandor L.04 OH 0.006 120,000 675.00
JUMLAH TENAGA KERJA 18,487.50
A PERALATAN

JUMLAH HARGA BAHAN -


B PERALATAN
Alat bantu ls 1.00 2,773.13 2,773.13
JUMLAH HARGA ALAT 2,773.13
Harga Satuan Pekerjaan 21,261
Overhead & profit 10% 23,387
Dibulatkan 23,300
Pasang Railing TYPE R4 (uk. 1,01m x t.1,1m), by specialist
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A UPAH & MATERIAL
Railing besi + finishing m2 1.21 403,200.00 487,872.00
- 487,872.00
B PERALATAN
Alat bantu ls 0.05 24,393.60 1,219.68
JUMLAH HARGA ALAT 1,219.68
Harga Satuan Peke 489,092
Overhead & profit 538,001
Dibulatkan 538,000
Pasang Railing TYPE R5 (uk. 1,315m x2x t.1,1m) by specialist
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A UPAH & MATERIAL
Railing besi + finishing m2 2.63 403,200.00 1,060,416.00
- 1,060,416.00
B PERALATAN
Alat bantu ls 0.05 53,020.80 2,651.04
JUMLAH HARGA ALAT 2,651.04
Harga Satuan Peke 1,063,067
Overhead & profit 1,169,374
Dibulatkan 1,169,300
Pasang Railing TYPE R6 (uk. 1,7m t.1,1m) by specialist
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A UPAH & MATERIAL
Railing besi + finishing m2 1.87 403,200.00 753,984.00
- 753,984.00
B PERALATAN
Alat bantu ls 0.05 37,699.20 1,884.96
JUMLAH HARGA ALAT 1,884.96
Harga Satuan Peke 755,869
Overhead & profit 831,456
Dibulatkan 831,400
Pasang Railing TYPE R7 (uk. 3,8m t.1,1m) by specialist
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A UPAH & MATERIAL
Railing besi + finishing m2 4.18 403,200.00 1,685,376.00
- 1,685,376.00
B PERALATAN
Alat bantu ls 0.05 84,268.80 4,213.44
JUMLAH HARGA ALAT 4,213.44

Harga Satuan Peke 1,689,589


Overhead & profit 1,858,548
Dibulatkan 1,858,500
ANALISA HARGA SATUAN PEKERJAAN

T.01. 1 m2 Pembersihan dan Striping/kosrekan

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.060 80,000.00 4,800.00
2 Mandor L.04 OH 0.006 120,000.00 720.00
Jumlah Harga Tenaga Kerja 5,520.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 5,520.00
E. Overhead + Profit (10%) 10% x D 552.00

F. Harga Satuan Pekerjaan per-m3 (D+E) 6,072.00

T.01. 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/tumbuhan diameter < 15 cm

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.075 80,000.00 6,000.00
2 Mandor L.04 OH 0.008 120,000.00 900.00
Jumlah Harga Tenaga Kerja 6,900.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 6,900.00
E. Overhead + Profit (10%) 10% x D 690.00

F. Harga Satuan Pekerjaan per-m3 (D+E) 7,590.00

T.06 1 m3 Galian Tanah Biasa Sedalam < 1 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.563 80,000.00 45,040.00
2 Mandor L.04 OH 0.056 120,000.00 6,756.00
Jumlah Harga Tenaga Kerja 51,796.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 51,796.00
E. Overhead + Profit (10%) 10% x D 5,179.60

F. Harga Satuan Pekerjaan per-m3 (D+E) 56,975.60

1 m3 Galian Tanah Biasa Sedalam s.d 2 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.675 80,000.00 54,000.00
2 Mandor L.04 OH 0.068 120,000.00 8,100.00
Jumlah Harga Tenaga Kerja 62,100.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 62,100.00
E. Overhead + Profit (10%) 10% x D 6,210.00

F. Harga Satuan Pekerjaan per-m3 (D+E) 68,310.00


1 m3 Galian Tanah Biasa Sedalam s.d 3 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.760 80,000.00 60,800.00
2 Mandor L.04 OH 0.076 120,000.00 9,120.00
Jumlah Harga Tenaga Kerja 69,920.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 69,920.00
E. Overhead + Profit (10%) 10% x D 6,992.00

F. Harga Satuan Pekerjaan per-m3 (D+E) 76,912.00

T.11. a. Galian Pasir untuk pondasi bangunan sedalam s.d. 1 m'

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.663 80,000.00 53,040.00
2 Mandor L.04 OH 0.066 120,000.00 7,920.00
Jumlah Harga Tenaga Kerja 60,960.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 60,960.00
E. Overhead + Profit (10%) 10% x D 6,096.00

F. Harga Satuan Pekerjaan per-m2 (D+E) 67,056.00

b. Galian Pasir untuk pondasi bangunan sedalam s.d. 2 m'

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.900 80,000.00 72,000.00
2 Mandor L.04 OH 0.090 120,000.00 10,800.00
Jumlah Harga Tenaga Kerja 82,800.00
B. Bahan
1 Minyak Tanah M.130 L 0.010 12,500.00 125.00
Jumlah Harga Bahan 125.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 82,925.00
E. Overhead + Profit (10%) 10% x D 8,292.50

F. Harga Satuan Pekerjaan per-m2 (D+E) 91,217.50

b. Galian Pasir untuk pondasi bangunan dengan kedalaman > 3 m, Tambahan Koefisien setiap penambahan kedalaman 1 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000 80,000.00 80,000.00
2 Mandor L.04 OH 0.100 120,000.00 12,000.00
Jumlah Harga Tenaga Kerja 92,000.00
B. Bahan
1 Minyak Tanah M.130 L 0.010 12,500.00 125.00
Jumlah Harga Bahan 125.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 92,125.00
E. Overhead + Profit (10%) 10% x D 9,212.50

F. Harga Satuan Pekerjaan per-m2 (D+E) 101,337.50


T.14. a. Timbunan atau Urugan tanah kembali ( 1m3 )

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.330 80,000.00 26,400.00
2 Mandor L.04 OH 0.033 120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 30,360.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 30,360.00
E. Overhead + Profit (10%) 10% x D 3,036.00

F. Harga Satuan Pekerjaan per-m2 (D+E) 33,396.00

b. Pemadatan Tanah ( 1m3 )

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.500 80,000.00 40,000.00
2 Mandor L.04 OH 0.050 120,000.00 6,000.00
Jumlah Harga Tenaga Kerja 46,000.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
1 Pemadat Timbunan (stamper) E.31 sewa-hari 0.050 300,000.00 15,000.00
Jumlah Harga Peralatan 15,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 61,000.00
E. Overhead + Profit (10%) 10% x D 6,100.00

F. Harga Satuan Pekerjaan per-m2 (D+E) 67,100.00

d. Pemadatan Pasir sebagai bahan pengisi ( 1m3 )

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.100 80,000.00 8,000.00
2 Mandor L.04 OH 0.010 120,000.00 1,200.00
Jumlah Harga Tenaga Kerja 9,200.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
1 Pemadat Timbunan (stamper) E.31 sewa-hari 0.100 300,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 39,200.00
E. Overhead + Profit (10%) 10% x D 3,920.00

F. Harga Satuan Pekerjaan per-m2 (D+E) 43,120.00

e. Timbunan Pasir sebagai bahan pengisi ( 1m3 )

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Mandor L.04 OH 0.027 120,000.00 3,240.00
Jumlah Harga Tenaga Kerja 27,240.00
B. Bahan
1 Pasir Urug M.14.b m3 1.200 160,000.00 192,000.00
Jumlah Harga Bahan 192,000.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 219,240.00
E. Overhead + Profit (10%) 10% x D 21,924.00

F. Harga Satuan Pekerjaan per-m2 (D+E) 241,164.00


T.15. Angkutan material dan/atau hasil galian

a. secara manual
1. Mengangkut 1 m3 galian dengan jarak angkut > 3m s.d < 5 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.248 80,000.00 19,840.00
2 Mandor L.04 OH 0.012 120,000.00 1,488.00
Jumlah Harga Tenaga Kerja 21,328.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 21,328.00
E. Overhead + Profit (10%) 10% x D 2,132.80

F. Harga Satuan Pekerjaan per-m2 (D+E) 23,460.80

2. Mengangkut 1 m3 galian dengan jarak angkut < 5 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.268 80,000.00 21,440.00
2 Mandor L.04 OH 0.013 120,000.00 1,608.00
Jumlah Harga Tenaga Kerja 23,048.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 23,048.00
E. Overhead + Profit (10%) 10% x D 2,304.80

F. Harga Satuan Pekerjaan per-m2 (D+E) 25,352.80

3. Mengangkut 1 m3 galian dengan jarak angkut 10 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.286 80,000.00 22,880.00
2 Mandor L.04 OH 0.014 120,000.00 1,716.00
Jumlah Harga Tenaga Kerja 24,596.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 24,596.00
E. Overhead + Profit (10%) 10% x D 2,459.60

F. Harga Satuan Pekerjaan per-m2 (D+E) 27,055.60

4. Mengangkut 1 m3 galian dengan jarak angkut 30 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.3560 80,000.00 28,480.00
2 Mandor L.04 OH 0.0178 120,000.00 2,136.00
Jumlah Harga Tenaga Kerja 30,616.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 30,616.00
E. Overhead + Profit (10%) 10% x D 3,061.60

F. Harga Satuan Pekerjaan per-m2 (D+E) 33,677.60


B.01 1 m3 beton untuk Lantai Kerja

Manual
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.500 80,000.00 120,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.022 110,000.00 2,420.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 159,880.00
B. Bahan
1 PC / Portland Cement M.15 kg 247
zak 4.94 58,750.00 290,225.00
2 PB / Pasir Beton M.14.a m3 0.621 160,000.00 99,360.00
3 Kr / Kerikil M.12 m3 0.740 160,000.00 118,400.00
4 Air M.02 L 200 25.00 5,000.00

Jumlah Harga Bahan 512,985.00


C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 672,865.00
E. Overhead + Profit (10%) 10% x D 67,286.50
F. Harga Satuan Pekerjaan per-m2 (D+E) 740,151.50
1 m2 beton untuk Lantai Kerja 74,015.15

B.12 1 m3 beton mutu f'c = 31.2 Mpa (K350) Kedap Air, Slump (12+2) cm, w/c = 0.48

Manual
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 2.100 80,000.00 168,000.00
2 Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
3 Kepala Tukang L.03 OH 0.035 110,000.00 3,850.00
4 Mandor L.04 OH 0.210 120,000.00 25,200.00
Jumlah Harga Tenaga Kerja 232,050.00
B. Bahan
1 PC / Portland Cement M.15 kg 448
zak 11.20 58,750.00 658,000.00
2 PB / Pasir Beton M.14.a kg 667
m 3
0.476 160,000.00 76,228.57
3 Kr / Kerikil M.12 kg 1,000
m 3
0.741 160,000.00 118,518.52
4 Air M.02 L 1,000
m 3
1.000 25.00 25.00
Jumlah Harga Bahan 852,772.09
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,084,822.09
E. Overhead + Profit (10%) 10% x D 108,482.21
F. Harga Satuan Pekerjaan per-m2 (D+E) 1,193,304.30

B.12 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
Menggunakan Molen
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 80,000.00 132,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 172,540.00
B. Bahan
1 PC / Portland Cement M.15 kg 413
zak 10.33 58,750.00 606,593.75
2 PB / Pasir Beton M.14.a kg 681
m 3
0.486 160,000.00 77,828.57
3 Kr / Kerikil M.12 kg 1,021
m 3
0.756 160,000.00 121,007.41
4 Air M.02 L 215
m 3
0.215 25,000.00 5,375.00
Jumlah Harga Bahan 810,804.73
C. Peralatan
1 Molen E.28.b Sewa-hari 0.250 250,000.00 62,500.00
Jumlah Harga Peralatan 62,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,045,844.73
E. Overhead + Profit (10%) 10% x D 104,584.47
F. Harga Satuan Pekerjaan per-m (D+E)
2
1,150,429.20
Menggunakan Molen k-275
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 80,000.00 132,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 172,540.00
B. Bahan
1 PC / Portland Cement M.15 kg 406
zak 10.15 58,750.00 596,312.50
2 PB / Pasir Beton M.14.a kg 684
m 3
0.489 160,000.00 78,171.43
3 Kr / Kerikil M.12 kg 1,026
m 3
0.760 160,000.00 121,600.00
4 Air M.02 L 215
m 3
0.215 25,000.00 5,375.00
Jumlah Harga Bahan 801,458.93
C. Peralatan
1 Molen E.28.b Sewa-hari 0.250 250,000.00 62,500.00
Jumlah Harga Peralatan 62,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,036,498.93
E. Overhead + Profit (10%) 10% x D 103,649.89
F. Harga Satuan Pekerjaan per-m (D+E)
2
1,140,148.82

1 m3 beton mutu f'c = 31.2 Mpa (K350) menggunakan ready mixed dan bahan aditif
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.250 100,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.025 110,000.00 2,750.00
4 Mandor L.04 OH 0.100 120,000.00 12,000.00
Jumlah Harga Tenaga Kerja 119,750.00
B. Bahan
1 Campuran Beton Ready Mixed M.09.x m2 1.02 1,150,429.20 1,173,437.79
Jumlah Harga Bahan 1,173,437.79
C. Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.120 250,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,323,187.79
E. Overhead + Profit (10%) 10% x D 132,318.78
F. Harga Satuan Pekerjaan per-m (D+E)
2
1,455,506.56

1 m3 beton mutu f'c = 23 Mpa (K275) menggunakan ready mixed dan bahan aditif
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.250 100,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.025 110,000.00 2,750.00
4 Mandor L.04 OH 0.100 120,000.00 12,000.00
Jumlah Harga Tenaga Kerja 119,750.00
B. Bahan
1 Campuran Beton Ready Mixed M.09.x m2 1.02 1,140,148.82 1,162,951.80
Jumlah Harga Bahan 1,162,951.80
C. Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.120 250,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,312,701.80
E. Overhead + Profit (10%) 10% x D 131,270.18
F. Harga Satuan Pekerjaan per-m2 (D+E) 1,443,971.98
1 m3 beton mutu f'c = 25 Mpa (K300) menggunakan ready mixed dan bahan aditif
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.000 80,000.00 0.00
2 Tukang Batu L.02 OH 0.000 100,000.00 0.00
3 Kepala Tukang L.03 OH 0.000 110,000.00 0.00
4 Mandor L.04 OH 0.000 120,000.00 0.00
Jumlah Harga Tenaga Kerja 0.00
B. Bahan
1 Beton Ready Mix K-300 M.09.x m2 1.02 870,000 887,400

Jumlah Harga Bahan 887,400.00


C. Peralatan
1 Pompa dan conveyor beton E.35 jam 0.120 250,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 917,400.00
E. Overhead + Profit (10%) 10% x D 91,740.00
F. Harga Satuan Pekerjaan per-m (D+E)
2
1,009,140.00

B.17 Pembesian 100 kg dengan Besi Polos atau Ulir

BESI ULIR U-39


Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.050 80,000.00 4,000.00 ###
2 Tukang Besi L.02 OH 0.050 100,000.00 5,000.00 ###
3 Kepala Tukang L.03 OH 0.005 110,000.00 550.00 ###
4 Mandor L.04 OH 0.003 120,000.00 360.00 ###
Jumlah Harga Tenaga Kerja 9,910.00
B. Bahan
1 Besi Beton (ulir) M.55.d kg 105 11,000.00 1,155,000.00
2 Kawat Ikat M.60 kg 1.5 20,000.00 30,000.00
Jumlah Harga Bahan 1,185,000.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,194,910.00
E. Overhead + Profit (10%) 10% x D 119,491.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 1,314,401.00
PER-KG 13,144.01

BESI ULIR U-24


Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.050 80,000.00 4,000.00
2 Tukang Besi L.02 OH 0.050 100,000.00 5,000.00
3 Kepala Tukang L.03 OH 0.005 110,000.00 550.00
4 Mandor L.04 OH 0.003 120,000.00 360.00
Jumlah Harga Tenaga Kerja 9,910.00
B. Bahan
1 Besi Beton (polos) M.55.d kg 105 11,000.00 1,155,000.00
2 Kawat Ikat M.60 kg 1.5 20,000.00 30,000.00
Jumlah Harga Bahan 1,185,000.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,194,910.00
E. Overhead + Profit (10%) 10% x D 119,491.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 1,314,401.00
PER-KG 13,144.01
B.20 Penambahan Koefisien Tenaga Kerja dan Peralatan untuk mengangkut/menaikkan 100 kg tulangan setiap kenaikkan vertikal 4m atau jarak setiap 25m ke tapak pemasangan

a.Manual (kenaikan 4 m)
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.100 100,000.00 10,000.00
3 Mandor L.04 OH 0.030 120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 37,600.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 37,600.00
E. Overhead + Profit (10%) 10% x D 3,760.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 41,360.00
PER-KG 413.60

b. Mekanis (penambahan jarak horisontal 10 m s/d 25 m)


Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.200 80,000.00 16,000.00
2 Tukang Besi L.02 OH 0.040 100,000.00 4,000.00
3 Mandor L.04 OH 0.020 120,000.00 2,400.00
Jumlah Harga Tenaga Kerja 22,400.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Crane E.07.a sewa-hari 0.025 550,000.00 13,750.00
Jumlah Harga Peralatan 13,750.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 36,150.00
E. Overhead + Profit (10%) 10% x D 3,615.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 39,765.00
PER-KG 397.65

c. Mekanis (penambahan jarak horisontal 25 m)


Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.100 100,000.00 10,000.00
3 Mandor L.04 OH 0.030 120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 37,600.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Crane E.07.a sewa-hari 0.025 550,000.00 13,750.00
Jumlah Harga Peralatan 13,750.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 51,350.00
E. Overhead + Profit (10%) 10% x D 5,135.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 56,485.00
PER-KG 564.85

d. Mekanis (kenaikan setiap 4 m)


Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.100 100,000.00 10,000.00
3 Mandor L.04 OH 0.030 120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 37,600.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Lift E.23 sewa-hari 0.025 250,000.00 6,250.00
Jumlah Harga Peralatan 6,250.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 43,850.00
E. Overhead + Profit (10%) 10% x D 4,385.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 48,235.00
PER-KG 482.35
B.26 Dibuat Insitu 1 m2 bekisting Balok Beton Biasa dengan Multflex 12 mm atau 18 mm (tanpa perancah)

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Multiflex 18 mm M.38.d lbr 0.245 200,000.00 49,000.00
2 Kaso 5/7 M.37.b m3 0.0945 1,000,000.00 94,500.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.350 15,000.00 5,250.00
4 Minyak Bekisting M.129 L 0.200 9,000.00 1,800.00
Jumlah Harga Bahan 150,550.00
pemakaian 3x 50,183.33
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 86,973.33
E. Overhead + Profit (10%) 10% x D 8,697.33
F. Harga Satuan Pekerjaan per-m2 (D+E) 95,670.67

B.27 Perancah Bekisting Balok Dengan Kaso 5/7 tinggi 4 m


Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Kaso 5/7 M.37.b m3 0.0945 1,000,000.00 94,500.00
2 Paku 5 cm dan 7 cm M.65.b kg 0.300 15,000.00 4,500.00
Jumlah Harga Bahan 99,000.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 135,790.00
E. Overhead + Profit (10%) 10% x D 13,579.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 149,369.00

B.28 Perancah Bekisting Balok Dengan Kayu Dolken diameter 8 cm tinggi 4 m

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Kayu Dolken dia. 8 - 10 cm, panjang 4 m M.31.b btg 4 10,000.00 40,000.00
2 Paku 5 cm dan 7 cm M.65.b kg 0.350 15,000.00 5,250.00
Jumlah Harga Bahan 45,250.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 82,040.00
E. Overhead + Profit (10%) 10% x D 8,204.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 90,244.00
B.29 Dibuat Insitu 1 m2 bekisting Kolom Beton Biasa dengan Multflex 9 mm

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Multiflex 9 mm M.38.d lbr 0.245 125,000.00 30,625.00
2 Kaso 5/7 M.37.b m3 0.095 1,000,000.00 94,500.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.250 15,000.00 3,750.00
4 Minyak Bekisting M.129 L 0.100 9,000.00 900.00
Jumlah Harga Bahan 129,775.00
pemakaian 3x 43,258.33
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 80,048.33
E. Overhead + Profit (10%) 10% x D 8,004.83
F. Harga Satuan Pekerjaan per-m2 (D+E) 88,053.17

B.30 Bekisting Kolom Beton Biasa dengan papan ukuran 3/20 cm

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Papan 3/20 cm Kayu Kelas II M.35.e m3 0.028 1,000,000.00 28,000.00 cek koeisien di permenPU
2 Kaso 5/7 M.37.b m3 0.122 1,000,000.00 122,000.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.400 15,000.00 6,000.00
4 Minyak Bekisting M.129 L 0.200 9,000.00 1,800.00
Jumlah Harga Bahan 157,800.00
pemakaian 3x 52,600.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 89,390.00
E. Overhead + Profit (10%) 10% x D 8,939.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 98,329.00

B.31 Bekisting Dinding beton biasa dengan multiflex 9 mm

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Multiflex 9 mm M.35.e m3 0.245 125,000.00 30,625.00
2 Kaso 5/7 M.37.b m3 0.095 1,000,000.00 94,500.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.250 15,000.00 3,750.00
4 Minyak Bekisting M.129 L 0.200 9,000.00 1,800.00
Jumlah Harga Bahan 130,675.00
pemakaian 3x 43,558.33
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 80,348.33
E. Overhead & Profit 10% x D 8,034.83
F. Harga Satuan Pekerjaan per-m2 (D+E) 88,383.17
B.32 Bekisting Dinding Beton Biasa dengan papan ukuran 3/20 cm

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Papan 3/20 cm Kayu Kelas II M.35.e m 3
0.028 1,000,000.00 28,000.00
2 Kaso 5/7 M.37.b m3 0.122 1,000,000.00 122,000.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.400 15,000.00 6,000.00
4 Minyak Bekisting M.129 L 0.200 9,000.00 1,800.00
Jumlah Harga Bahan 157,800.00
pemakaian 3x 52,600.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 89,390.00
E. Overhead & Profit 10% x D 8,939.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 98,329.00

B.33 Bekisting Pondasi dan Sloof Beton Biasa dengan multiflex 9 mm

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.52 80,000.00 41,600.00
2 Tukang Kayu L.02 OH 0.26 100,000.00 26,000.00
3 Kepala Tukang L.03 OH 0.03 110,000.00 2,860.00
4 Mandor L.04 OH 0.03 120,000.00 3,120.00
Jumlah Harga Tenaga Kerja 73,580.00
B. Bahan
1 Multiflex 9 mm M.35.e lbr 0.380 125,000.00 47,500.00
2 Kaso 5/7 M.37.b m3 0.034 1,000,000.00 34,000.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.250 15,000.00 3,750.00
4 Minyak Bekisting M.129 L 0.200 9,000.00 1,800.00
Jumlah Harga Bahan 87,050.00
pemakaian 3x 29,016.67
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 102,596.67
E. Overhead & Profit 10% x D 10,259.67
F. Harga Satuan Pekerjaan per-m2 (D+E) 112,856.33

B.34 Bekisting Pondasi dan Sloof Beton Biasa dengan papan ukuran 3/20 cm

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Papan 3/20 cm Kayu Kelas II M.35.e m 3
0.028 1,000,000.00 28,000.00
2 Kaso 5/7 M.37.b m3 0.122 1,000,000.00 122,000.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.400 15,000.00 6,000.00
4 Minyak Bekisting M.129 L 0.200 9,000.00 1,800.00
Jumlah Harga Bahan 157,800.00
pemakaian 3x 52,600.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 89,390.00
E. Overhead & Profit 10% x D 8,939.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 98,329.00
B.35 Bongkar 1 m2 bekisting secara biasa (dan membereskan puing-puing)

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.040 80,000.00 3,200.00
2 Mandor L.04 OH 0.004 120,000.00 480.00
Jumlah Harga Tenaga Kerja 3,680.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 3,680.00
E. Overhead & Profit 10% x D 368.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 4,048.00

B.36 Bongkar 1 m2 bekisting secara Hati - hati (untuk beton expose dan/atau pemanfaatan kembali bekisting)

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.100 80,000.00 8,000.00
2 Mandor L.04 OH 0.010 120,000.00 1,200.00
Jumlah Harga Tenaga Kerja 9,200.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 9,200.00
E. Overhead & Profit 10% x D 920.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 10,120.00

B.37 Menggenangi air 100 m2 permukaan Beton

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.800 80,000.00 64,000.00
2 Mandor L.04 OH 0.040 120,000.00 4,800.00
Jumlah Harga Tenaga Kerja 68,800.00
B. Bahan
1 Air M.02 m 3
5.000 25,000.00 125,000.00
Jumlah Harga Bahan 125,000.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 193,800.00
E. Overhead & Profit 10% x D 19,380.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 213,180.00
1 m2 2,131.80

B.38 Menyirami air 100 m2 permukaan Beton

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.800 80,000.00 64,000.00
2 Mandor L.04 OH 0.080 120,000.00 9,600.00
Jumlah Harga Tenaga Kerja 73,600.00
B. Bahan
1 Karung Goni M.123.b m 2
102.000 1,500.00 153,000.00
Jumlah Harga Bahan 153,000.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 226,600.00
E. Overhead & Profit 10% x D 22,660.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 249,260.00
1 m2 2,492.60
F.12 Tiang Pancang Beton Bertulang (25 cm x 25 cm)

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.052 80,000.00 4,160.00
2 Tukang L.02 OH 0.010 100,000.00 1,040.00
3 Mandor L.04 OH 0.005 120,000.00 624.00
4 Operator Crane L.05 OH 0.010 120,000.00 1,248.00
5 Pembantu Operator L.06 OH 0.010 100,000.00 1,040.00
Jumlah Harga Tenaga Kerja 8,112.00
B. Bahan
1 Tiang Pancang Beton Tulang 25X25 cm M.18.c m' 1.030 116,000.00 119,480.00
Jumlah Harga Bahan 119,480.00
C. Peralatan
1 Crane 5 - 10 ton E.07.b sewa-jam 0.073 300,000.00 21,840.00
2 Alat Pancang + Hammer 2 ton E.01.d sewa-jam 0.073 100,000.00 7,280.00
3 Alat Penyambung Tiang Pancang E.02.a bh 0.250 100,000.00 25,000.00
Jumlah Harga Peralatan 54,120.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 181,712.00
E. Overhead & Profit 10% x D 18,171.20
F. Harga Satuan Pekerjaan per-m' (D+E) 199,883.20

F.12 Tiang Pancang Beton Bertulang (25 cm x 25 cm)


Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.052 80,000.00 4,160.00
2 Tukang L.02 OH 0.010 100,000.00 1,040.00
3 Mandor L.04 OH 0.005 120,000.00 624.00
4 Operator Crane L.05 OH 0.010 120,000.00 1,248.00
5 Pembantu Operator L.06 OH 0.010 100,000.00 1,040.00
Jumlah Harga Tenaga Kerja 8,112.00
B. Bahan
1 Tiang Pancang Beton Tulang 25X25 cm M.18.c m' 1.030 116,000.00 119,480.00
Jumlah Harga Bahan 119,480.00
C. Peralatan
1 Crane 5 - 10 ton E.07.b sewa-jam 0.073 300,000.00 21,840.00
2 Alat Pancang + Hammer 2 ton E.01.d sewa-jam 0.073 100,000.00 7,280.00
3 Alat Penyambung Tiang Pancang E.02.a bh 0.250 100,000.00 25,000.00
Jumlah Harga Peralatan 54,120.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 181,712.00
E. Overhead & Profit 10% x D 18,171.20
199,883.20
F. Harga Satuan Pekerjaan per-m' (D+E) 199,000.00

F.13 Bekisting Pondasi dan Sloof Beton Biasa dengan batako, spesi 1:5
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00 cek koefisiann
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 36,900.00
B BAHAN
batako kuning (putih/tras) Bh 12.500 1,500.00 18,750.00
Semen Portlan zak 0.194 58,750.00 11,374.00
Pasir Pasang m3 0.045 160,000.00 7,200.00
JUMLAH HARGA BAHAN 37,324.00
C PERALATAN
Alat Bantu 0.005 74,224.00 371.12
JUMLAH HARGA ALAT 371.12

D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 74,595.12


E. Overhead & Profit 10% x D 7,459.51
F Harga Satuan Pekerjaan per-m (D+E)
'
82,054.63
F.14 Pemasangan 1m2 rolag bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 5PP
tambahan
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.060 80,000.00 4,800.00
Tukang Batu L.02 OH 0.020 100,000.00 2,000.00
Kepala Tukang L.03 OH 0.020 110,000.00 2,200.00
Mandor L.04 OH 0.003 120,000.00 360.00
JUMLAH TENAGA KERJA 9,360.00
B BAHAN -
Bata merah Bh 13.000 600.00 7,800.00
Semen Portlan Kg 2.060 58,750.00 121,025.00
Pasir Pasang m3 0.010 160,000.00 1,600.00
JUMLAH HARGA BAHAN 130,425.00
C PERALATAN
Alat Bantu 0.005 139,785.00 698.93
JUMLAH HARGA ALAT 698.93

D Jumlah (A+B+C) 140,483.93


E Overhead & Profit 10% x D 10% 14,048.39
F Harga Satuan Pekerjaan (D+E) 154,532.32

F.15 Pemasangan 1m2Rangka atap baja ringan (galvalum)+ alumunium foil

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH - 80,000.00 -
Tukang L.02 OH 0.34 100,000.00 34,000.00
Kepala Tukang L.03 OH 0.034 110,000.00 3,740.00
Mandor L.04 OH 0.034 120,000.00 4,080.00
JUMLAH TENAGA KERJA 41,820.00
B BAHAN
Profil Galvalum m 5 14,000 70,000.00
Profil Reng baja ringan m 3 6,000 18,000.00
Dinabolt buah 0.5 1,600 800.00
Sekrup fixer buah 40 750 30,000.00
Alumunium foil 1 sisi m2 1 6,000 6,000.00
JUMLAH HARGA BAHAN 124,800.00
C PERALATAN
Alat Bantu - - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 166,620.00


E Overhead & Profit 10% x D 10% 183,282.00
F Harga Satuan Pekerjaan (D+E) 183,200.00

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 212,250.00
B BAHAN
Batu belah m3 1.2 180,000.00 216,000.00
Semen portland Zak 4.04 58,750.00 237,350.00
Pasir Pasang m3 0.485 160,000.00 77,600.00
JUMLAH HARGA BAHAN 530,950.00
C PERALATAN
Alat Bantu - - -
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 743,200.00


E Overhead & Profit 10% x D 10% 74,320.00
F Harga Satuan Pekerjaan (D+E) 817,520.00
Pasang Baja Profil 1kg

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Besi WF kg 1.15 14,000.00 16,100.00
JUMLAH HARGA BAHAN 16,100.00
C PERALATAN
Alat Bantu ls 1.000 805.00 805.00
JUMLAH HARGA ALAT 805.00

D Jumlah (A+B+C) 28,725.00


E Overhead & Profit 10% x D 10% 2,872.50
F Harga Satuan Pekerjaan (D+E) 31,597.50

PASANG 1M3 SIKAGROUT

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang L.02 OH 2.3333 100,000.00 233,333.33
Kepala Tukang L.03 OH 0.2333 110,000.00 25,666.67
Mandor L.04 OH 0.1167 120,000.00 14,000.00
JUMLAH TENAGA KERJA 833,000.00
B BAHAN
SIKAGROUT kg 77 Rp 3,120.00 240,240.00
JUMLAH HARGA BAHAN 240,240.00
C PERALATAN
Alat Bantu 0.050 12,012.00 600.60
JUMLAH HARGA ALAT 600.60

D Jumlah (A+B+C) 1,073,840.60


E Overhead & Profit 10% x D 10% 107,384.06
F Harga Satuan Pekerjaan (D+E) 1,181,224.66

Rangka Atap Baja Ringan

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
1 Tukang kayu L.02 OH 0.340 100,000.00 34,000.00
2 Kepala Tukang L.03 OH 0.034 110,000.00 3,740.00
3 Mandor L.04 OH 0.034 120,000.00 4,080.00
41,820.00
B BAHAN
Baja ringan C 75.75 m 4.000 14,000.00 56,000.00 https://hargabeton.com/harga-baja-ringan/

Roof Bottom/Reng R 33-0.45 m' 5.000 6,000.00 30,000.00 https://hargabeton.com/harga-baja-ringan/


Self drilling screw dia 6 x 20 mm (truss Screw) bh 45.00 320.00 14,400.00
Dynabol dia 12 x 120 mm bh 0.700 1,600.00 1,120.00
Alumunium Foil DS m2 1.200 - -
101,520.00
C PERALATAN
-

D Jumlah (A+B+C) 143,340.00


E Overhead & Profit 10% x D 14,334.00
F Harga Satuan Pekerjaan (D+E) 157,674.00

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 36,900.00
B BAHAN
1 Batu bata Bh 140.00 700.00 98,000.00
2 Semen PC 50 kg Kg 14.370 1,175.00 16,884.75
3 Pasir Pasang m3 0.040 160,000.00 6,400.00
121,284.75
C PERALATAN
-
D Jumlah (A+B+C) 158,184.75
E Overhead & Profit 10% x D 15,818.48
F Harga Satuan Pekerjaan (D+E) 174,003.23
A.4.1.1Pemasangan 100 kg jaring kawat baja (wiremesh)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2500 80,000 20,000.00
Tukang Besi L.02 OH 0.2500 100,000 25,000.00
Kepala Tukang L.03 OH 0.0250 110,000 2,750.00
Mandor L.04 OH 0.0250 120,000 3,000.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN
Wire mesh kg 102.0000 11,000 1,122,000.00
Kawat beton kg 0.5000 20,000 10,000.00
JUMLAH HARGA BAHAN 1,132,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,182,750.00
E Overhead & Profit 10% 118,275.00
F Harga Satuan Pekerjaan (D+E) 1,301,025.00
1Kg Besi 13,010.00

Pasang Baja Profil 1kg

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Baja IWF kg 1.150 14,000.00 16,100.00
Menie Cat Besi kg 0.030 22,000.00 660.00

JUMLAH HARGA BAHAN 16,760.00


C PERALATAN
Alat Bantu ls 1.000 838.00 838.00
sewa mesin las jam 0.300 -
JUMLAH HARGA ALAT 838.00

D Jumlah (A+B+C) 29,418.00


E Overhead & Profit 10% x D 2,941.80
F Harga Satuan Pekerjaan (D+E) 32,359.80

PASANG 1M3 SIKAGROUT

Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang L.02 OH 2.3333 100,000.00 233,333.33
Kepala Tukang L.03 OH 0.2333 110,000.00 25,666.67
Mandor L.04 OH 0.1167 120,000.00 14,000.00
JUMLAH TENAGA KERJA 833,000.00
B BAHAN
SIKAGROUT SAK 77 78,000.00 6,006,000.00
JUMLAH HARGA BAHAN 6,006,000.00
C PERALATAN
Alat Bantu 0.050 300,300.00 15,015.00
JUMLAH HARGA ALAT 15,015.00

D Jumlah (A+B+C) 6,854,015.00


E Overhead & Profit 10% x D 10% 7,539,416.50
F Harga Satuan Pekerjaan (D+E) 7,539,400.00
Rangka Atap Baja Ringan

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
1 Tukang kayu L.02 OH 0.340 100,000.00 34,000.00
2 Kepala Tukang L.03 OH 0.034 110,000.00 3,740.00
3 Mandor L.04 OH 0.034 120,000.00 4,080.00
41,820.00
B BAHAN
Baja ringan C 75.75 m 4.000 14,000.00 56,000.00 https://hargabeton.com/harga-baja-ringan/
Roof Bottom/Reng R 33-0.45 m' 5.000 6,000.00 30,000.00 https://hargabeton.com/harga-baja-ringan/
Self drilling screw dia 6 x 20 mm (truss Screw) bh 45.00 320.00 14,400.00
Dynabol dia 12 x 120 mm bh 0.700 1,600.00 1,120.00
Alumunium Foil DS m2 1.200 -
101,520.00
C PERALATAN
-

D Jumlah (A+B+C) 143,340.00


E Overhead & Profit 10% x D 14,334.00
F Harga Satuan Pekerjaan (D+E) 157,674.00

A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 36,900.00
B BAHAN
1 Batu bata Bh 140.00 600.00 84,000.00
2 Semen PC 50 kg Kg 14.370 1,175.00 16,884.75
3 Pasir Pasang m3 0.040 160,000.00 6,400.00
107,284.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 144,184.75
E Overhead & Profit 10% x D 14,418.48
F Harga Satuan Pekerjaan (D+E) 158,603.23

Per m' Pengeboran Tanah Diameter 60 cm

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
1 Pekerja L.01 OH 0.540 80,000.00 43,200.00
2 Tukang Gali Tanah L.02 OH 0.300 100,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.210 110,000.00 23,100.00
4 Mandor L.04 OH 0.250 120,000.00 30,000.00
JUMLAH TENAGA KERJA 126,300.00
B BAHAN

C PERALATAN
alat bor D60 cm jam 0.600 180,000.00 108,000.00
108,000.00
-
D Jumlah (A+B+C) 234,300.00
E Overhead & Profit 10% x D 23,430.00
F Harga Satuan Pekerjaan (D+E) 257,730.00

per m' Pengeboran Tanah Diameter 80 cm

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
1 Pekerja L.01 OH 0.540 80,000.00 43,200.00
2 Tukang Gali Tanah L.02 OH 0.350 100,000.00 35,000.00
3 Kepala Tukang L.03 OH 0.210 110,000.00 23,100.00
4 Mandor L.04 OH 0.250 120,000.00 30,000.00
JUMLAH TENAGA KERJA 131,300.00
B BAHAN
C PERALATAN
SEWA alat bor D80 cm m' 0.700 260,000.00 182,000.00
182,000.00
-
D Jumlah (A+B+C) 313,300.00
E Overhead & Profit 10% x D 31,330.00
F Harga Satuan Pekerjaan (D+E) 344,630.00
per m'Pengeboran Tanah Diameter 100 cm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
1 Pekerja L.01 OH 0.740 80,000.00 59,200.00
2 Tukang Gali Tanah L.02 OH 0.500 100,000.00 50,000.00
3 Kepala Tukang L.03 OH 0.430 110,000.00 47,300.00
4 Mandor L.04 OH 0.500 120,000.00 60,000.00
JUMLAH TENAGA KERJA 216,500.00
B BAHAN
C PERALATAN
alat bor D100 cm m' 0.700 440,000.00 308,000.00
308,000.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 524,500.00
E Overhead & Profit 10% x D 52,450.00
F Harga Satuan Pekerjaan (D+E) 576,950.00
e. Timbunan Tanah di datangkan

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Mandor L.04 OH 0.027 120,000.00 3,240.00
Jumlah Harga Tenaga Kerja 27,240.00
B. Bahan
1 Tanah timbun M.14.b m3 1.200 80,000.00 96,000.00
Jumlah Harga Bahan 96,000.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 123,240.00

E. Overhead + Profit (10%) 10% x D 12,324.00

F. Harga Satuan Pekerjaan per-m2 (D+E) 135,564.00

e. Timbunan Makadam + Pemadatan ( 1m3 )

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.400 80,000.00 32,000.00
2 Mandor L.04 OH 0.037 120,000.00 4,440.00
Jumlah Harga Tenaga Kerja 36,440.00
B. Bahan
1 Makadam (batu pecah 5/7) M.14.b m3 1.100 160,000.00 176,000.00
Jumlah Harga Bahan 176,000.00
C. Peralatan
Pemadat Timbunan (stamper) E.31 jam 0.100 300,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 242,440.00

E. Overhead + Profit (10%) 10% x D 24,244.00

F. Harga Satuan Pekerjaan per-m2 (D+E) 266,684.00


BERAT JENIS
bj pasir 1540 kg/m3
bj pasir 1600 kg/m3 0.000403246753247 #REF! #REF!
bj split 1750 kg/m3 0.000422857142857 #REF! #REF!
bj air 1000 kg/m3

1.500
0.275
0.022
0.083

BERAT JENIS
bj pasir 1400 kg/m3
bj pasir 1600 kg/m3 0.476428571428571 #REF! #REF!
bj split 1350 kg/m3 0.740740740740741 #REF! #REF!
bj air 1000 kg/m3
Menggunakan Molen k-175
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 80,000.00 132,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 172,540.00
B. Bahan
1 PC / Portland Cement M.15 kg 326 1,468.75 478,812.50
zak 8.15 58,750.00
2 PB / Pasir Beton M.14.a kg 760
m3 0.543 160,000.00 86,857.14
3 Kr / Kerikil M.12 kg 1,029
m 3
0.762 160,000.00 121,955.56
4 Air M.02 L 215
m 3
0.215 25,000.00 5,375.00
Jumlah Harga Bahan 693,000.20
C. Peralatan
1 Molen E.28.b Sewa-hari 0.250 0.00 0.00
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 865,540.20
E. Overhead + Profit (10%) 10% x D 86,554.02
F. Harga Satuan Pekerjaan per-m (D+E)
2
952,094.22
1 m3 beton mutu f'c = 14,5 Mpa (K175) menggunakan beton manual
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.648 80,000.00 51,840.00
2 Tukang Batu L.02 OH 0.108 100,000.00 10,800.00
3 Kepala Tukang L.03 OH 0.054 110,000.00 5,940.00
4 Mandor L.04 OH 0.027 120,000.00 3,240.00
Jumlah Harga Tenaga Kerja 71,820.00
B. Bahan
1 Campuran Beton Manual K175 M.09.x m2 1.02 952,094 971,136

Jumlah Harga Bahan 971,136.10


C. Peralatan
1 Alat Bantu ls 1.000 48,556.81 48,556.81
Jumlah Harga Peralatan 48,556.81
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,091,512.91
E. Overhead + Profit (10%) 10% x D 109,151.29
F. Harga Satuan Pekerjaan per-m (D+E) 2
1,200,664.20

beton floor t= 8 cm/m2 96,053 175,200.00


besi wire mesh 1 lps 5.52384 1Kg Besi 13,144.01 72,605.41

6,623

Pek. M2 Rangka Atap Besi Pipa + reng Baja CNP 100.50.20.3,2+ zink
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.300 100,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.030 110,000.00 3,300.00
4 Mandor L.04 OH 0.030 120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 60,900.00
B. Bahan
1 Pipa Galvanis M.54.d kg 8.69 18,963.83 164,795.68
2 Baja CNP M.54.c kg 16.50 14,000.00 231,000.00
3 Kawat Las M.62 kg 0.25 55,000.00 13,750.00
4 Mur baut dan ring M.56.e bh 2.00 3,052.00 6,104.00
5 Cat dasar & Finishing ls 1.00 20,000.00 20,000.00
Jumlah Harga Bahan 435,649.68
C. Peralatan 1 Ls 1.000 25,000.00 25,000.00
Jumlah Harga Peralatan 25,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 521,549.68
E. Overhead + Profit (10%) 10% x D 52,154.97
F. Harga Satuan Pekerjaan per-m2 (D+E) 573,704.65

PER-KG 5,737.05
B.27 Bekisting Balok Dengan Multipleks 9mm
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.660 80,000.00 52,800.00
2 Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
3 Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
4 Mandor L.04 OH 0.033 120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 93,390.00
B. Bahan
1 Multipleks 9mm M.37.b m3 0.3500 125,000.00 43,750.00
2 Kayu kelas III M.65.b m3 0.058 1,000,000.00 58,000.00
2 Paku 5 cm dan 7 cm M.65.b kg 0.400 15,000.00 6,000.00
3 Minyak bekisting M.65.b lt 0.100 9,000.00 900.00
4 Dolken Kayu Galam diameter 8 - 10 cm / 4 m btg 2.00 10,000.00 20,000.00
Jumlah Harga Bahan 128,650.00
C. Peralatan pemakaian 3x 42,883.33
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 136,273.33
E. Overhead + Profit (10%) 10% x D 13,627.33
F. Harga Satuan Pekerjaan per-m2 (D+E) 149,900.67

0.04 m3 Kayu Klas III (Terentang)


0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.018 m3 Balok Kayu Klas II
0.35 Lbr Plywood tebal 9mm
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m

0.06
B.29 Bekisting plat lantai m2

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.260 80,000.00 20,800.00
2 Tukang Kayu L.02 OH 0.130 100,000.00 13,000.00
3 Kepala Tukang L.03 OH 0.013 110,000.00 1,430.00
4 Mandor L.04 OH 0.013 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 36,790.00
B. Bahan
1 Multipleks 9 mm M.35.e m 3
0.120 125,000.00 15,000.00
2 Kaso 5/7 M.37.b m3 0.095 1,000,000.00 95,000.00
3 Paku 5 cm dan 7 cm M.65.b kg 0.300 15,000.00 4,500.00
4 Minyak Bekisting M.129 L 0.100 9,000.00 900.00
Jumlah Harga Bahan 115,400.00
pemakaian 3x 38,466.67
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 75,256.67
E. Overhead + Profit (10%) 10% x D 7,525.67
F. Harga Satuan Pekerjaan per-m2 (D+E) 82,782.33

cek koeisien di permenPU


No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01.01 OH 0.6600
Tukang Kayu L.02.04 OH 0.3300
Kepala Tukang L.03.01 OH 0.0330
Mandor L.04.01 OH 0.0330
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.0400
Paku 5 - 12 cm kg 0.4000
Minyak bekisting Liter 0.2000
Balok kayu kelas II m3 0.0150
Plywood 9 mm Lbr 0.3500
Dolken kayu Ø 8-10/400 cm Batang 2.0000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
Bongkar beton Bertulang 1m3

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 13.334 80,000.00 1,066,720.00
2 Mandor L.04 OH 0.666 120,000.00 79,920.00
Jumlah Harga Tenaga Kerja 1,146,640.00
B. Bahan
0.00
Jumlah Harga Bahan 0.00
C. Peralatan 0.00
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,146,640.00
E. Overhead & Profit 10% x D 114,664.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 1,261,304.00

Potong Kepala tiang pancang mini pile 25x25 0.04375 55,200

Buang Lumpur per Rit

Harga Satuan Jumlah


No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
cek koefisiann 1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.200 80,000.00 16,000.00
2 Mandor L.04 OH 0.010 120,000.00 1,200.00
Jumlah Harga Tenaga Kerja 17,200.00
B. Bahan
0.00
Jumlah Harga Bahan 0.00
C. Peralatan Sewa mobil sedot lumpur rit 1.000 600,000.00 600,000.00
Jumlah Harga Peralatan 600,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 617,200.00
E. Overhead & Profit 10% x D 61,720.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 678,920.00
tambahan

A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP


No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA 0 0
Pekerja L.01.01 OH 1.5 115000 172500
Tukang Batu L.02.03 OH 0.75 126000 94500
Kepala Tukang L.03.01 OH 0.075 153000 11475
Mandor L.04.01 OH 0.075 163000 12225
JUMLAH TENAGA KERJA 290700
B BAHAN 0 0
Batu belah m3 1.2 375000 450000
Semen portland Kg 202 1400 282800
Pasir Pasang m3 0.485 260000 126100
JUMLAH HARGA BAHAN 858900
C PERALATAN 0 0
JUMLAH HARGA ALAT 0
D Jumlah (A+B+C) 0 1149600
Kolom Bajaringan per m'
Harga Satuan
Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
No

A TENAGA
1 Tukang kayu L.02 OH 0.088 100,000.00 8,800.00 7,457
2 Kepala Tukang L.03 OH 0.008 110,000.00 880.00
3 Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 9,800.00
B BAHAN
Baja ringan C 75.75 m 2.000 14,000.00 28,000.00

Dynabol dia 12 x 120 mm bh 1.143 1,600.00 1,828.57

JUMLAH HARGA BAHAN 29,828.57


C PERALATAN
JUMLAH HARGA ALAT -

D Jumlah (A+B+C) 39,628.57


E Overhead & Profit 10% 3,962.86
F Harga Satuan Pekerjaan (D+E) 43,591.43

TEST PDA TIANG PANCANG PER PAKET = Rp 10,000,000

100 kg Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0010 110,000.00 110.00
Mandor L.04 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 18,710.00
B BAHAN
Solar ltr 1.0000 6560 6,560.00
Minyak Pelumas ltr 0.1000 30000 3,000.00

JUMLAH HARGA BAHAN 9,560.00


C PERALATAN
Alat Bantu ls 1.000 478.00 478.00
sewa mesin las jam 0.800 - -
JUMLAH HARGA ALAT 478.00

D Jumlah (A+B+C) 28,748.00


E Overhead & Profit 10% x D 10% 2,874.80
F Harga Satuan Pekerjaan (D+E) 31,622.80
1 KG 316.23

Pasang pipa 4 " Baja 1kg

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Pipa Baja kg 1.150 14,000.00 16,100.00
Menie Cat Besi kg 0.030 22,000.00 660.00

JUMLAH HARGA BAHAN 16,760.00


C PERALATAN
Alat Bantu ls 1.000 838.00 838.00

JUMLAH HARGA ALAT 838.00

D Jumlah (A+B+C) 29,418.00


E Overhead & Profit 10% x D 2,941.80
F Harga Satuan Pekerjaan (D+E) 32,359.80

Pasang Baja Profil pengaku 1kg

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Besi WF kg 1.15 14,000.00 16,100.00
Menie Cat Besi ls 0.02 22,000.00 440.00
JUMLAH HARGA BAHAN 16,540.00
C PERALATAN
Alat Bantu ls 1.000 827.00 827.00
JUMLAH HARGA ALAT 827.00

D Jumlah (A+B+C) 29,187.00


E Overhead & Profit 10% x D 2,918.70
F Harga Satuan Pekerjaan (D+E) 32,105.70
TEST PDA TIANG PANCANG PER PAKET = Rp 10,000,000

Pasang pipa 2,5 "Baja 1kg

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Pipa Medium Galvanis 2,50" kg 1.150 16,896.55 19,431.03
Menie Cat Besi kg 0.020 22,000.00 440.00

JUMLAH HARGA BAHAN 19,871.03


C PERALATAN
Alat Bantu ls 1.000 993.55 993.55
sewa mesin las jam 0.220 -
JUMLAH HARGA ALAT 993.55

D Jumlah (A+B+C) 32,684.58


E Overhead & Profit 10% x D 10% 3,268.46
F Harga Satuan Pekerjaan (D+E) 35,953.04

Pasang pipa 3 "Baja 1kg

Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Pipa Medium Galvanis 3" kg 1.150 18,963.83 21,808.40
Menie Cat Besi 0.020 22,000.00 440.00
kg 0.030 - -
JUMLAH HARGA BAHAN 22,248.40
C PERALATAN
Alat Bantu ls 1.000 1,112.42 1,112.42
Sewa Mesin las jam 0.25 - -
JUMLAH HARGA ALAT 1,112.42

D Jumlah (A+B+C) 35,180.82


E Overhead & Profit 10% x D 3,518.08
F Harga Satuan Pekerjaan (D+E) 38,698.91
ANALISA MEKANIKAL
Memasang 1 m' pipa PVC AW ø 1/2"
Bahan An. SNI ( Revisi ) 6.1.1
1.000 m' Pipa PVC AW @ Rp. 4,937.50 = Rp 4,937.50
35.000 % Perlengkapan = Rp 1,728.13
Sub total : = Rp 6,665.63
Upah An. SNI ( Revisi ) 6.1.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Total upah+bahan : = Rp 24,215.63

Memasang 1 m' pipa PVC AW ø 3/4"


Bahan An. SNI ( Revisi ) 6.2.1
1.000 m' Pipa PVC AW @ Rp. 6,187.50 = Rp 6,187.50
35.000 % Perlengkapan = Rp 2,165.63
Sub total : = Rp 8,353.13
Upah An. SNI ( Revisi ) 6.2.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Total upah+bahan : = Rp 25,903.13
Memasang 1 m' pipa PVC AW ø 1"
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m' Pipa PVC AW @ Rp. 7,937.50 = Rp 7,937.50
35.000 % Perlengkapan = Rp 2,778.13
Sub total : = Rp 10,715.63
Upah An. SNI ( Revisi ) 6.3.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Total upah+bahan : = Rp 28,265.63

Memasang 1 m' pipa PVC AW ø 1,25"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PVC AW @ Rp. 10,437.50 = Rp 10,437.50
35.000 % Perlengkapan = Rp 3,653.12
Sub total : = Rp 14,090.63
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 43,358.63
Memasang 1 m' pipa PVC AW ø 1,5"
Bahan An. SNI ( Revisi ) 6.5.1
1.000 m' Pipa PVC AW @ Rp. 11,687.50 = Rp 11,687.50
35.000 % Perlengkapan = Rp 4,090.62
Sub total : = Rp 15,778.13
Upah An. SNI ( Revisi ) 6.5.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 45,046.13

Memasang 1 m' pipa PVC AW ø 2"


Bahan An. SNI ( Revisi ) 6.6.1
1.000 m' Pipa PVC AW @ Rp. 14,187.50 = Rp 14,187.50
35.000 % Perlengkapan = Rp 4,965.63
Sub total : = Rp 19,153.13
Upah An. SNI ( Revisi ) 6.6.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 48,421.13
Memasang 1 m' pipa PVC AW ø 2,5"
Bahan An. SNI ( Revisi ) 6.7.1
1.000 m' Pipa PVC AW @ Rp. 20,437.50 = Rp 20,437.50
35.000 % Perlengkapan = Rp 7,153.13
Sub total : = Rp 27,590.63
Upah An. SNI ( Revisi ) 6.7.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 56,858.63

Memasang 1 m' pipa PVC AW ø 3"


Bahan An. SNI ( Revisi ) 6.7.1
1.000 m' Pipa PVC AW @ Rp. 24,950.00 = Rp 24,950.00
35.000 % Perlengkapan = Rp 8,732.50
Sub total : = Rp 33,682.50
Upah An. SNI ( Revisi ) 6.7.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 62,950.50
Memasang 1 m' pipa PVC AW ø 4"
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 42,187.50 = Rp 42,187.50
35.000 % Perlengkapan = Rp 14,765.62
Sub total : = Rp 56,953.13
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 80,000.00 = Rp 10,800.00
0.225 Oh Tukang @ Rp. 100,000.00 = Rp 22,500.00
0.023 Oh Kepala tukang @ Rp. 110,000.00 = Rp 2,475.00
0.007 Oh Mandor @ Rp. 120,000.00 = Rp 816.00
Sub total : = Rp 36,591.00
Total upah+bahan : = Rp 93,544.13

Memasang 1 m' pipa PVC AW ø 6"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC AW @ Rp. 100,187.50 = Rp 100,187.50
35.000 % Perlengkapan = Rp 35,065.63
Sub total : = Rp 135,253.13
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 80,000.00 = Rp 10,800.00
0.225 Oh Tukang @ Rp. 100,000.00 = Rp 22,500.00
0.023 Oh Kepala tukang @ Rp. 110,000.00 = Rp 2,475.00
0.007 Oh Mandor @ Rp. 120,000.00 = Rp 816.00
Sub total : = Rp 36,591.00
Total upah+bahan : = Rp 171,844.13
Memasang 1 m' pipa BSP sch. 40 ø 1/2"
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m' Pipa BSP sch 40 @ Rp. = Rp 0.00
35.000 % Perlengkapan = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 52.65

Total upah+bahan : = Rp 17,602.65

Memasang 1 m' pipa BSP sch. 40 ø 3/4"


Bahan An. SNI ( Revisi ) 6.10.1
1.000 m' Pipa BSP sch 40 @ Rp. = Rp 0.00
35.000 % Perlengkapan = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.10.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 52.65

Total upah+bahan : = Rp 17,602.65


Memasang 1 m' pipa BSP sch. 40 ø 1"
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m' Pipa BSP sch 40 @ Rp. 21,920.00 = Rp 21,920.00
35.000 % Perlengkapan = Rp 7,672.00
Sub total : = Rp 29,592.00
Upah An. SNI ( Revisi ) 6.11.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 141.43

Total upah+bahan : = Rp 47,283.43

Memasang 1 m' pipa BSP sch. 40 ø 1,25"


Bahan An. SNI ( Revisi ) 6.12.1
1.000 m' Pipa BSP sch 40 @ Rp. 29,933.33 = Rp 29,933.33
35.000 % Perlengkapan = Rp 10,476.67
Sub total : = Rp 40,410.00
Upah An. SNI ( Revisi ) 6.12.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 173.88

Total upah+bahan : = Rp 58,133.88


Memasang 1 m' pipa BSP sch. 40 ø 1,5"
Bahan An. SNI ( Revisi ) 6.13.1
1.000 m' Pipa BSP sch 40 @ Rp. 35,606.66 = Rp 35,606.66
35.000 % Perlengkapan = Rp 12,462.33
Sub total : = Rp 48,068.99
Upah An. SNI ( Revisi ) 6.13.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 196.86

Total upah+bahan : = Rp 65,815.85

Memasang 1 m' pipa BSP sch. 40 ø 2"


Bahan An. SNI ( Revisi ) 6.14.1
1.000 m' Pipa BSP sch 40 @ Rp. 47,520.00 = Rp 47,520.00
35.000 % Perlengkapan = Rp 16,632.00
Sub total : = Rp 64,152.00
Upah An. SNI ( Revisi ) 6.14.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 245.11

Total upah+bahan : = Rp 81,947.11


Memasang 1 m' pipa BSP sch. 40 ø 2,5"
Bahan An. SNI ( Revisi ) 6.15.1
1.000 m' Pipa BSP sch 40 @ Rp. 78,513.33 = Rp 78,513.33
35.000 % Perlengkapan = Rp 27,479.67
Sub total : = Rp 105,993.00
Upah An. SNI ( Revisi ) 6.15.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.100 Oh Tukang cat @ Rp. 100,000.00 = Rp 10,000.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 49,958.00
Lain-lain K3 + CAR = Rp 467.85

Total upah+bahan : = Rp 156,418.85


Memasang 1 m' pipa BSP sch. 40 ø 3"
Bahan An. SNI ( Revisi ) 6.16.1
1.000 m' Pipa BSP sch 40 @ Rp. 98,653.33 = Rp 98,653.33
35.000 % Perlengkapan = Rp 34,528.67
Sub total : = Rp 133,182.00
Upah An. SNI ( Revisi ) 6.16.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.160 Oh Tukang cat @ Rp. 100,000.00 = Rp 16,000.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 55,958.00
Lain-lain K3 + CAR = Rp 567.42

Total upah+bahan : = Rp 189,707.42


Memasang 1 m' pipa BSP sch. 40 ø 4"
Bahan An. SNI ( Revisi ) 6.17.1
1.000 m' Pipa BSP sch 40 @ Rp. 140,286.66 = Rp 140,286.66
35.000 % Perlengkapan = Rp 49,100.33
Sub total : = Rp 189,386.99
Upah An. SNI ( Revisi ) 6.17.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.160 Oh Tukang cat @ Rp. 100,000.00 = Rp 16,000.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 55,958.00
Lain-lain K3 + CAR = Rp 736.03

Total upah+bahan : = Rp 246,081.03

Memasang 1 m' pipa BSP sch. 40 ø 5"


Bahan An. SNI ( Revisi ) 6.18.1
1.000 m' Pipa BSP sch 40 @ Rp. 189,793.33 = Rp 189,793.33
35.000 % Perlengkapan = Rp 66,427.67
Sub total : = Rp 256,221.00
Upah An. SNI ( Revisi ) 6.18.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.290 Oh Tukang las @ Rp. 100,000.00 = Rp 29,000.00
0.200 Oh Tukang cat @ Rp. 100,000.00 = Rp 20,000.00
0.007 Oh Mandor @ Rp. 120,000.00 = Rp 840.00
Sub total : = Rp 64,150.00
Total upah+bahan : = Rp 320,371.00
Memasang 1 m' pipa BSP sch. 40 ø 6"
Bahan An. SNI ( Revisi ) 6.19.1
1.000 m' Pipa BSP sch 40 @ Rp. 245,320.00 = Rp 245,320.00
35.000 % Perlengkapan = Rp 85,862.00
Sub total : = Rp 331,182.00
Upah An. SNI ( Revisi ) 6.19.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.290 Oh Tukang las @ Rp. 100,000.00 = Rp 29,000.00
0.200 Oh Tukang cat @ Rp. 100,000.00 = Rp 20,000.00
0.007 Oh Mandor @ Rp. 120,000.00 = Rp 840.00
Sub total : = Rp 64,150.00
Lain-lain K3 + CAR = Rp 1,186.00

Total upah+bahan : = Rp 396,518.00


Memasang 1 bh pompa jet pump
Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh jet pump @ Rp. 2,500,000.00 = Rp 2,500,000.00
1.000 m' Pengeboran @ Rp. 2,000,000.00 = Rp 2,000,000.00
10.000 % Perlengkapan = Rp 450,000.00
Sub total : = Rp 4,950,000.00
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 80,000.00 = Rp 104,000.00
1.700 Oh Tukang @ Rp. 100,000.00 = Rp 170,000.00
0.700 Oh Kepala tukang @ Rp. 110,000.00 = Rp 77,000.00
0.700 Oh Mandor @ Rp. 120,000.00 = Rp 84,000.00
Sub total : = Rp 435,000.00
Total upah+bahan : = Rp 5,385,000.00

Memasang 1 bh pompa lift pump


Bahan An. SNI ( Revisi ) 6.32.1
1.000 bh Pompa transfer 80 Lpm @ Rp. 4,672,000.00 = Rp 4,672,000.00
1.000 % Perlengkapan = Rp 93,440.00
Sub total : = Rp 4,765,440.00
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 80,000.00 = Rp 104,000.00
1.700 Oh Tukang @ Rp. 110,000.00 = Rp 187,000.00
0.700 Oh Kepala tukang @ Rp. 80,000.00 = Rp 56,000.00
0.700 Oh Mandor @ Rp. 120,000.00 = Rp 84,000.00
Sub total : = Rp 431,000.00
Lain-lain K3 + CAR = Rp 15,589.32

Total upah+bahan : = Rp 5,212,029.32


Memasang 1 bh panel control pompa
Bahan An. SNI ( Revisi ) 6.32.1
1.000 bh Panel Control Pompa @ Rp. 5,000,000.00 = Rp 5,000,000.00
1.000 % Perlengkapan = Rp 100,000.00
Sub total : = Rp 5,100,000.00
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 80,000.00 = Rp 104,000.00
1.700 Oh Tukang @ Rp. 110,000.00 = Rp 187,000.00
0.700 Oh Kepala tukang @ Rp. 80,000.00 = Rp 56,000.00
0.700 Oh Mandor @ Rp. 120,000.00 = Rp 84,000.00
Sub total : = Rp 431,000.00
Lain-lain K3 + CAR = Rp 16,593.00

Total upah+bahan : = Rp 5,547,593.00

Memasang 1 bh Jet Pump


Bahan An. SNI ( Revisi ) 6.32.1
1.000 bh Jet Pump @ Rp. 2,500,000.00 = Rp 2,500,000.00
1.000 % Perlengkapan = Rp 50,000.00
Sub total : = Rp 2,550,000.00
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 80,000.00 = Rp 104,000.00
1.700 Oh Tukang @ Rp. 110,000.00 = Rp 187,000.00
0.700 Oh Kepala tukang @ Rp. 80,000.00 = Rp 56,000.00
0.700 Oh Mandor @ Rp. 120,000.00 = Rp 84,000.00
Sub total : = Rp 431,000.00
Lain-lain K3 + CAR = Rp 8,943.00

Total upah+bahan : = Rp 2,989,943.00


Memasang 1 bh tangki toren
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh tangki air 1500 Liter @ Rp. 1,337,600.00 = Rp 1,337,600.00
1.000 % Perlengkapan = Rp 13,376.00
Sub total : = Rp 1,350,976.00
Upah An. SNI ( Revisi ) 6.32.2
1.000 Oh Pekerja @ Rp. 80,000.00 = Rp 80,000.00
1.200 Oh Tukang @ Rp. 110,000.00 = Rp 132,000.00
0.300 Oh Kepala tukang @ Rp. 80,000.00 = Rp 24,000.00
0.360 Oh Mandor @ Rp. 120,000.00 = Rp 43,200.00
Sub total : = Rp 279,200.00
Lain-lain K3 + CAR = Rp 4,890.53

Total upah+bahan : = Rp 1,635,066.53

Memasang 1 bh tangki toren


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh tangki air 4 m3 @ Rp. 2,794,000.00 = Rp 2,794,000.00
1.000 % Perlengkapan = Rp 27,940.00
Sub total : = Rp 2,821,940.00
Upah An. SNI ( Revisi ) 6.32.2
1.000 Oh Pekerja @ Rp. 80,000.00 = Rp 80,000.00
1.200 Oh Tukang @ Rp. 110,000.00 = Rp 132,000.00
0.300 Oh Kepala tukang @ Rp. 80,000.00 = Rp 24,000.00
0.360 Oh Mandor @ Rp. 120,000.00 = Rp 43,200.00
Sub total : = Rp 279,200.00
Lain-lain K3 + CAR = Rp 9,303.42

Total upah+bahan : = Rp 3,110,443.42


Memasang 1 bh pompa diesel (pemadam kebakaran)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh diesel fire pump @ Rp. 94,000,000.00 = Rp 94,000,000.00
1.000 % Perlengkapan = Rp 940,000.00
Sub total : = Rp 94,940,000.00
Upah An. SNI ( Revisi ) 6.32.2
2.000 Oh Pekerja @ Rp. 80,000.00 = Rp 160,000.00
2.000 Oh Tukang @ Rp. 110,000.00 = Rp 220,000.00
1.000 Oh Kepala tukang @ Rp. 80,000.00 = Rp 80,000.00
1.000 Oh Mandor @ Rp. 120,000.00 = Rp 120,000.00
Sub total : = Rp 580,000.00
Lain-lain K3 + CAR = Rp 286,560.00

Total upah+bahan : = Rp 95,806,560.00

Memasang 1 bh jockey pump (pemadam kebakaran)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh jockey pump @ Rp. 16,800,000.00 = Rp 16,800,000.00
15.000 % Perlengkapan = Rp 2,520,000.00
Sub total : = Rp 19,320,000.00
Upah An. SNI ( Revisi ) 6.32.2
1.300 Oh Pekerja @ Rp. 80,000.00 = Rp 104,000.00
1.700 Oh Tukang @ Rp. 110,000.00 = Rp 187,000.00
0.700 Oh Kepala tukang @ Rp. 80,000.00 = Rp 56,000.00
0.700 Oh Mandor @ Rp. 120,000.00 = Rp 84,000.00
Sub total : = Rp 431,000.00
Lain-lain K3 + CAR = Rp 59,253.00

Total upah+bahan : = Rp 19,810,253.00


Memasang 1 bh Gate valve 10K 3/4" (20 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 3/4" @ Rp. 58,000.00 = Rp 58,000.00
10.000 % Perlengkapan = Rp 5,800.00
Sub total : = Rp 63,800.00
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Tukang @ Rp. 110,000.00 = Rp 5,500.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 10,516.00
Lain-lain K3 + CAR = Rp 222.95

Total upah+bahan : = Rp 74,538.95


Memasang 1 bh Gate valve 10K 1" (25 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 1" @ Rp. 68,400.00 = Rp 68,400.00
10.000 % Perlengkapan = Rp 6,840.00
Sub total : = Rp 75,240.00
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Tukang @ Rp. 110,000.00 = Rp 5,500.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 10,516.00
Lain-lain K3 + CAR = Rp 257.27

Total upah+bahan : = Rp 86,013.27


Memasang 1 bh Gate valve 10K 1,25" (32 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 1,25" @ Rp. 91,000.00 = Rp 91,000.00
10.000 % Perlengkapan = Rp 9,100.00
Sub total : = Rp 100,100.00
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Tukang @ Rp. 110,000.00 = Rp 5,500.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 10,516.00
Lain-lain K3 + CAR = Rp 331.85

Total upah+bahan : = Rp 110,947.85

Memasang 1 bh Gate valve 10K 1,5" (40 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 1,5" @ Rp. 126,000.00 = Rp 126,000.00
10.000 % Perlengkapan = Rp 12,600.00
Sub total : = Rp 138,600.00
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Tukang @ Rp. 110,000.00 = Rp 5,500.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 10,516.00
Lain-lain K3 + CAR = Rp 447.35

Total upah+bahan : = Rp 149,563.35


Memasang 1 bh Gate valve 10K 2" (50 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 2" @ Rp. 206,000.00 = Rp 206,000.00
10.000 % Perlengkapan = Rp 20,600.00
Sub total : = Rp 226,600.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 728.45

Total upah+bahan : = Rp 243,544.45

Memasang 1 bh Gate valve 10K 2,5" (65 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 2,5" @ Rp. 507,560.00 = Rp 507,560.00
10.000 % Perlengkapan = Rp 50,756.00
Sub total : = Rp 558,316.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 1,723.60

Total upah+bahan : = Rp 576,255.60


Memasang 1 bh Gate valve 10K 3" (80 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 3" @ Rp. 860,000.00 = Rp 860,000.00
10.000 % Perlengkapan = Rp 86,000.00
Sub total : = Rp 946,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.015 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,200.00
0.010 Oh Mandor @ Rp. 120,000.00 = Rp 1,200.00
Sub total : = Rp 30,900.00
Lain-lain K3 + CAR = Rp 2,930.70

Total upah+bahan : = Rp 979,830.70

Memasang 1 bh Gate valve 10K 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 4" @ Rp. 1,410,000.00 = Rp 1,410,000.00
10.000 % Perlengkapan = Rp 141,000.00
Sub total : = Rp 1,551,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.015 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,200.00
0.010 Oh Mandor @ Rp. 120,000.00 = Rp 1,200.00
Sub total : = Rp 30,900.00
Lain-lain K3 + CAR = Rp 4,745.70

Total upah+bahan : = Rp 1,586,645.70


Memasang 1 bh Gate valve 10K 6" (150 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 6" @ Rp. 2,370,000.00 = Rp 2,370,000.00
10.000 % Perlengkapan = Rp 237,000.00
Sub total : = Rp 2,607,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 7,987.50

Total upah+bahan : = Rp 2,670,487.50

Memasang 1 bh Gate valve 16K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 2" @ Rp. 610,000.00 = Rp 610,000.00
10.000 % Perlengkapan = Rp 61,000.00
Sub total : = Rp 671,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 2,061.65

Total upah+bahan : = Rp 689,277.65


Memasang 1 bh Gate valve 16K 4" (100 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 4" @ Rp. 1,410,000.00 = Rp 1,410,000.00
10.000 % Perlengkapan = Rp 141,000.00
Sub total : = Rp 1,551,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.015 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,200.00
0.010 Oh Mandor @ Rp. 120,000.00 = Rp 1,200.00
Sub total : = Rp 30,900.00
Lain-lain K3 + CAR = Rp 4,745.70

Total upah+bahan : = Rp 1,586,645.70

Memasang 1 bh Gate valve 16K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Gate valve 6" @ Rp. 1,836,000.00 = Rp 1,836,000.00
10.000 % Perlengkapan = Rp 183,600.00
Sub total : = Rp 2,019,600.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 6,225.30

Total upah+bahan : = Rp 2,081,325.30


Memasang 1 bh Butterfly valve 10K "toyo" 4" (150 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Butterfly valve 6" @ Rp. 3,625,000.00 = Rp 3,625,000.00
10.000 % Perlengkapan = Rp 362,500.00
Sub total : = Rp 3,987,500.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.015 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,200.00
0.010 Oh Mandor @ Rp. 120,000.00 = Rp 1,200.00
Sub total : = Rp 30,900.00
Total upah+bahan : = Rp 4,018,400.00

Memasang 1 bh Check valve 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh check valve 2" @ Rp. 860,000.00 = Rp 860,000.00
10.000 % Perlengkapan = Rp 86,000.00
Sub total : = Rp 946,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 2,886.65

Total upah+bahan : = Rp 965,102.65


Memasang 1 bh Check valve 16K 4" (100 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh check valve 4" @ Rp. 1,224,000.00 = Rp 1,224,000.00
10.000 % Perlengkapan = Rp 122,400.00
Sub total : = Rp 1,346,400.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.015 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,200.00
0.010 Oh Mandor @ Rp. 120,000.00 = Rp 1,200.00
Sub total : = Rp 30,900.00
Lain-lain K3 + CAR = Rp 4,131.90

Total upah+bahan : = Rp 1,381,431.90

Memasang 1 bh Check valve 16K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh check valve 6" @ Rp. 1,836,000.00 = Rp 1,836,000.00
10.000 % Perlengkapan = Rp 183,600.00
Sub total : = Rp 2,019,600.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 6,225.30

Total upah+bahan : = Rp 2,081,325.30


Memasang 1 bh strainer 10K 2" (50 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh strainer 2" @ Rp. 460,000.00 = Rp 460,000.00
10.000 % Perlengkapan = Rp 46,000.00
Sub total : = Rp 506,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 1,566.65

Total upah+bahan : = Rp 523,782.65

Memasang 1 bh strainer 16K 4" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh strainer 4" @ Rp. 1,500,000.00 = Rp 1,500,000.00
10.000 % Perlengkapan = Rp 150,000.00
Sub total : = Rp 1,650,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 4,998.65

Total upah+bahan : = Rp 1,671,214.65


Memasang 1 bh strainer 16K 2,5" (65 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh strainer 2,5" @ Rp. 2,928,750.00 = Rp 2,928,750.00
10.000 % Perlengkapan = Rp 292,875.00
Sub total : = Rp 3,221,625.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 9,713.52

Total upah+bahan : = Rp 3,247,554.52

Memasang 1 bh strainer 16K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh strainer 6" @ Rp. 1,810,000.00 = Rp 1,810,000.00
10.000 % Perlengkapan = Rp 181,000.00
Sub total : = Rp 1,991,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 6,139.50

Total upah+bahan : = Rp 2,052,639.50

Memasang 1 bh flexible joint 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh flexible joint 2" @ Rp. 168,000.00 = Rp 168,000.00
10.000 % Perlengkapan = Rp 16,800.00
Sub total : = Rp 184,800.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 603.05

Total upah+bahan : = Rp 201,619.05


Memasang 1 bh flexible joint 10K 4" (100 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh flexible joint 4" @ Rp. 693,000.00 = Rp 693,000.00
10.000 % Perlengkapan = Rp 69,300.00
Sub total : = Rp 762,300.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 2,335.55

Total upah+bahan : = Rp 780,851.55

Memasang 1 bh flexible joint 10K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh flexible joint 6" @ Rp. 486,000.00 = Rp 486,000.00
10.000 % Perlengkapan = Rp 48,600.00
Sub total : = Rp 534,600.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 1,770.30

Total upah+bahan : = Rp 591,870.30

Memasang 1 bh foot valve 10K 2" (50 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh foot valve 2" @ Rp. 566,000.00 = Rp 566,000.00
10.000 % Perlengkapan = Rp 56,600.00
Sub total : = Rp 622,600.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 1,916.45

Total upah+bahan : = Rp 640,732.45


Memasang 1 bh foot valve 10K 4" (100 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh foot valve 4" @ Rp. 3,520,000.00 = Rp 3,520,000.00
10.000 % Perlengkapan = Rp 352,000.00
Sub total : = Rp 3,872,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.080 Oh Pekerja @ Rp. 80,000.00 = Rp 6,400.00
0.080 Oh Tukang @ Rp. 110,000.00 = Rp 8,800.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 16,216.00
Lain-lain K3 + CAR = Rp 11,664.65

Total upah+bahan : = Rp 3,899,880.65

Memasang 1 bh foot valve 10K 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh foot valve 6" @ Rp. 1,884,000.00 = Rp 1,884,000.00
10.000 % Perlengkapan = Rp 188,400.00
Sub total : = Rp 2,072,400.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 6,383.70

Total upah+bahan : = Rp 2,134,283.70

Memasang 1 bh Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m c/w coupling machino
jet nozzel, hydran valve 1,5" dan 2,5", dan hose rack
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh IHB @ Rp. 1,799,600.00 = Rp 1,799,600.00
10.000 % Perlengkapan = Rp 179,960.00
Sub total : = Rp 1,979,560.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 6,105.18

Total upah+bahan : = Rp 2,041,165.18


Memasang 1 bh Ooutdoor Hydran Box (OHB) Type C, termasuk fire hose 2,5"x30 m c/w coupling machino
jet nozzel 2,5"
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh OHB @ Rp. 1,513,600.00 = Rp 1,513,600.00
10.000 % Perlengkapan = Rp 151,360.00
Sub total : = Rp 1,664,960.00
Upah An. SNI ( Revisi ) 6.32.2
0.180 Oh Pekerja @ Rp. 80,000.00 = Rp 14,400.00
0.180 Oh Tukang @ Rp. 110,000.00 = Rp 19,800.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 42,200.00
Lain-lain K3 + CAR = Rp 5,121.48

Total upah+bahan : = Rp 1,712,281.48

Memasang 1 bh Hydran pillar 2 ways


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Pillar hydran @ Rp. 1,452,000.00 = Rp 1,452,000.00
10.000 % Perlengkapan = Rp 145,200.00
Sub total : = Rp 1,597,200.00
Upah An. SNI ( Revisi ) 6.32.2
0.400 Oh Pekerja @ Rp. 80,000.00 = Rp 32,000.00
0.400 Oh Tukang @ Rp. 110,000.00 = Rp 44,000.00
0.050 Oh Kepala tukang @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Mandor @ Rp. 120,000.00 = Rp 6,000.00
Sub total : = Rp 86,000.00
Lain-lain K3 + CAR = Rp 5,049.60

Total upah+bahan : = Rp 1,688,249.60


Memasang 1 bh Siamesse connection
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Siamesse connection @ Rp. 1,400,000.00 = Rp 1,400,000.00
10.000 % Perlengkapan = Rp 140,000.00
Sub total : = Rp 1,540,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.400 Oh Pekerja @ Rp. 80,000.00 = Rp 32,000.00
0.400 Oh Tukang @ Rp. 110,000.00 = Rp 44,000.00
0.050 Oh Kepala tukang @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Mandor @ Rp. 120,000.00 = Rp 6,000.00
Sub total : = Rp 86,000.00
Lain-lain K3 + CAR = Rp 4,878.00

Total upah+bahan : = Rp 1,630,878.00

Memasang 1 bh Fire Extinguisher


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Fire Extinguisher 3,5 Kg DCP @ Rp. 162,800.00 = Rp 162,800.00
5.000 % Perlengkapan = Rp 8,140.00
Sub total : = Rp 170,940.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 610.32

Total upah+bahan : = Rp 204,050.32


Memasang 1 bh Fire Extinguisher
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Fire Extinguisher 4,6 Kg CO2 @ Rp. 323,400.00 = Rp 323,400.00
5.000 % Perlengkapan = Rp 16,170.00
Sub total : = Rp 339,570.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 1,116.21

Total upah+bahan : = Rp 373,186.21

Memasang 1 bh roof drain dia. 2" besi cor


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Roof drain @ Rp. 26,880.00 = Rp 26,880.00
10.000 % Perlengkapan = Rp 2,688.00
Sub total : = Rp 29,568.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 186.20

Total upah+bahan : = Rp 62,254.20


Memasang 1 bh roof drain dia. 3" besi cor
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Roof drain @ Rp. 33,600.00 = Rp 33,600.00
10.000 % Perlengkapan = Rp 3,360.00
Sub total : = Rp 36,960.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 208.38

Total upah+bahan : = Rp 69,668.38

Memasang 1 bh roof drain dia. 4" besi cor


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Roof drain @ Rp. 50,400.00 = Rp 50,400.00
10.000 % Perlengkapan = Rp 5,040.00
Sub total : = Rp 55,440.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 263.82

Total upah+bahan : = Rp 88,203.82


Memasang 1 bh roof drain dia. 5" besi cor
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Roof drain @ Rp. 200,000.00 = Rp 200,000.00
10.000 % Perlengkapan = Rp 20,000.00
Sub total : = Rp 220,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 80,000.00 = Rp 16,000.00
0.200 Oh Tukang @ Rp. 110,000.00 = Rp 22,000.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 42,000.00
Total upah+bahan : = Rp 262,000.00
Memasang 1 bhFloor drain 2" (50 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Floor drain 2" @ Rp. 94,000.00 = Rp 94,000.00
10.000 % Perlengkapan = Rp 9,400.00
Sub total : = Rp 103,400.00
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 80,000.00 = Rp 16,000.00
0.200 Oh Tukang @ Rp. 110,000.00 = Rp 22,000.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 42,000.00
Lain-lain K3 + CAR = Rp 436.20

Total upah+bahan : = Rp 145,836.20


Memasang 1 bh Clean out (FCO) 3" (80 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Clean out 3" @ Rp. 38,000.00 = Rp 38,000.00
10.000 % Perlengkapan = Rp 3,800.00
Sub total : = Rp 41,800.00
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 80,000.00 = Rp 16,000.00
0.200 Oh Tukang @ Rp. 110,000.00 = Rp 22,000.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 42,000.00
Lain-lain K3 + CAR = Rp 251.40

Total upah+bahan : = Rp 84,051.40

Memasang 1 bh Clean out (FCO) 6" (150 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Clean out 6" @ Rp. 152,000.00 = Rp 152,000.00
10.000 % Perlengkapan = Rp 15,200.00
Sub total : = Rp 167,200.00
Upah An. SNI ( Revisi ) 6.32.2
0.200 Oh Pekerja @ Rp. 80,000.00 = Rp 16,000.00
0.200 Oh Tukang @ Rp. 110,000.00 = Rp 22,000.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 42,000.00
Lain-lain K3 + CAR = Rp 627.60

Total upah+bahan : = Rp 209,827.60


Memasang 1 bh Clean out (FCO) 2" (50 mm)
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Clean out 2" @ Rp. 24,000.00 = Rp 24,000.00
10.000 % Perlengkapan = Rp 2,400.00
Sub total : = Rp 26,400.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 176.70

Total upah+bahan : = Rp 59,076.70

Memasang 1 bh Clean out (FCO) 4" (100 mm)


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Clean out 4" @ Rp. 44,000.00 = Rp 44,000.00
10.000 % Perlengkapan = Rp 4,400.00
Sub total : = Rp 48,400.00
Upah An. SNI ( Revisi ) 6.32.2
0.180 Oh Pekerja @ Rp. 80,000.00 = Rp 14,400.00
0.180 Oh Tukang @ Rp. 110,000.00 = Rp 19,800.00
0.018 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,440.00
0.018 Oh Mandor @ Rp. 120,000.00 = Rp 2,160.00
Sub total : = Rp 37,800.00
Lain-lain K3 + CAR = Rp 258.60

Total upah+bahan : = Rp 86,458.60


Memasang 1 bh Exhaust Ceiling Mounted
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Exhaust Ceiling Mounted @ Rp. 740,000.00 = Rp 740,000.00
10.000 % Perlengkapan = Rp 74,000.00
Sub total : = Rp 814,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.400 Oh Pekerja @ Rp. 80,000.00 = Rp 32,000.00
0.400 Oh Tukang @ Rp. 110,000.00 = Rp 44,000.00
0.050 Oh Kepala tukang @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Mandor @ Rp. 120,000.00 = Rp 6,000.00
Sub total : = Rp 86,000.00
Lain-lain K3 + CAR = Rp 2,700.00

Total upah+bahan : = Rp 902,700.00

Memasang 1 bh Grille
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Grille 200x200 mm @ Rp. 100,000.00 = Rp 100,000.00
10.000 % Perlengkapan = Rp 10,000.00
Sub total : = Rp 110,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 427.50

Total upah+bahan : = Rp 142,927.50


Memasang 1 bh Grille
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Grille 100x100 mm @ Rp. 72,000.00 = Rp 72,000.00
10.000 % Perlengkapan = Rp 7,200.00
Sub total : = Rp 79,200.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 335.10

Total upah+bahan : = Rp 112,035.10


ANALISA MEKANIKAL
Memasang 1 m' pipa PPR PN-10 ø 1/2"
Bahan An. SNI ( Revisi ) 6.1.1
1.000 m' Pipa PPR PN-10 @ Rp. 10,945.00 = Rp 10,945.00
35.000 % Perlengkapan = Rp 3,830.75
Sub total : = Rp 14,775.75
Upah An. SNI ( Revisi ) 6.1.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Total upah+bahan : = Rp 32,325.75

Memasang 1 m' pipa PPR PN-10 ø 3/4"


Bahan An. SNI ( Revisi ) 6.2.1
1.000 m' Pipa PPR PN-10 @ Rp. 14,327.50 = Rp 14,327.50
35.000 % Perlengkapan = Rp 5,014.63
Sub total : = Rp 19,342.13
Upah An. SNI ( Revisi ) 6.2.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Total upah+bahan : = Rp 36,892.13
Memasang 1 m' pipa PPR PN-10 ø 1"
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m' Pipa PPR PN-10 @ Rp. 23,045.00 = Rp 23,045.00
35.000 % Perlengkapan = Rp 8,065.75
Sub total : = Rp 31,110.75
Upah An. SNI ( Revisi ) 6.3.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Total upah+bahan : = Rp 48,660.75

Memasang 1 m' pipa PVC D ø 1,25"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PVC AW @ Rp. 6,950.00 = Rp 6,950.00
35.000 % Perlengkapan = Rp 2,432.50
Sub total : = Rp 9,382.50
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 38,650.50
Memasang 1 m' pipa PPR PN-10 ø 1,5"
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 56,650.00 = Rp 56,650.00
35.000 % Perlengkapan = Rp 19,827.50
Sub total : = Rp 76,477.50
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 105,745.50

Memasang 1 m' pipa PVC D ø 2"


Bahan An. SNI ( Revisi ) 6.6.1
1.000 m' Pipa PVC AW @ Rp. 10,450.00 = Rp 10,450.00
35.000 % Perlengkapan = Rp 3,657.50
Sub total : = Rp 14,107.50
Upah An. SNI ( Revisi ) 6.6.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 43,375.50
Memasang 1 m' pipa PPR PN-10 ø 2,5"
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 125,482.50 = Rp 125,482.50
35.000 % Perlengkapan = Rp 43,918.88
Sub total : = Rp 169,401.38
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 198,669.38

Memasang 1 m' pipa PPR PN-10 ø 3"


Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 181,115.00 = Rp 181,115.00
35.000 % Perlengkapan = Rp 63,390.25
Sub total : = Rp 244,505.25
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 273,773.25
Memasang 1 m' pipa PPR PN-10 ø 4"
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PPR PN-10 @ Rp. 268,977.50 = Rp 268,977.50
35.000 % Perlengkapan = Rp 94,142.13
Sub total : = Rp 363,119.63
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 80,000.00 = Rp 10,800.00
0.225 Oh Tukang @ Rp. 100,000.00 = Rp 22,500.00
0.023 Oh Kepala tukang @ Rp. 110,000.00 = Rp 2,475.00
0.007 Oh Mandor @ Rp. 120,000.00 = Rp 816.00
Sub total : = Rp 36,591.00
Total upah+bahan : = Rp 399,710.63
Memasang 1 m' pipa GIP med ø 1/2"
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m' Pipa GIP @ Rp. 13,760.00 = Rp 13,760.00
35.000 % Perlengkapan = Rp 4,816.00
Sub total : = Rp 18,576.00
Upah An. SNI ( Revisi ) 6.9.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 108.38

Total upah+bahan : = Rp 36,234.38

Memasang 1 m' pipa GIP med ø 3/4"


Bahan An. SNI ( Revisi ) 6.10.1
1.000 m' Pipa GIP @ Rp. 17,660.00 = Rp 17,660.00
35.000 % Perlengkapan = Rp 6,181.00
Sub total : = Rp 23,841.00
Upah An. SNI ( Revisi ) 6.10.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 124.17

Total upah+bahan : = Rp 41,515.17


Memasang 1 m' pipa GIP med ø 1"
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m' Pipa GIP @ Rp. 27,413.33 = Rp 27,413.33
35.000 % Perlengkapan = Rp 9,594.67
Sub total : = Rp 37,008.00
Upah An. SNI ( Revisi ) 6.11.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 163.67

Total upah+bahan : = Rp 54,721.67

Memasang 1 m' pipa GIP med ø 1,25"


Bahan An. SNI ( Revisi ) 6.12.1
1.000 m' Pipa GIP @ Rp. 35,640.00 = Rp 35,640.00
35.000 % Perlengkapan = Rp 12,474.00
Sub total : = Rp 48,114.00
Upah An. SNI ( Revisi ) 6.12.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 196.99

Total upah+bahan : = Rp 65,860.99


Memasang 1 m' pipa GIP med ø 1,5"
Bahan An. SNI ( Revisi ) 6.13.1
1.000 m' Pipa GIP @ Rp. 40,853.33 = Rp 40,853.33
35.000 % Perlengkapan = Rp 14,298.67
Sub total : = Rp 55,152.00
Upah An. SNI ( Revisi ) 6.13.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 218.11

Total upah+bahan : = Rp 72,920.10

Memasang 1 m' pipa GIP med ø 2"


Bahan An. SNI ( Revisi ) 6.14.1
1.000 m' Pipa GIP @ Rp. 55,786.66 = Rp 55,786.66
35.000 % Perlengkapan = Rp 19,525.33
Sub total : = Rp 75,311.99
Upah An. SNI ( Revisi ) 6.14.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.027 Oh Mandor @ Rp. 120,000.00 = Rp 3,240.00
Sub total : = Rp 17,550.00
Lain-lain K3 + CAR = Rp 278.59

Total upah+bahan : = Rp 93,140.58


Memasang 1 m' pipa GIP med ø 2,5"
Bahan An. SNI ( Revisi ) 6.15.1
1.000 m' Pipa GIP @ Rp. 132,806.66 = Rp 132,806.66
35.000 % Perlengkapan = Rp 46,482.33
Sub total : = Rp 179,288.99
Upah An. SNI ( Revisi ) 6.15.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.100 Oh Tukang cat @ Rp. 100,000.00 = Rp 10,000.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 49,958.00
Lain-lain K3 + CAR = Rp 687.74

Total upah+bahan : = Rp 229,934.73


Memasang ( HEADER ) pipa GIP med ø 4"
Bahan An. SNI ( Revisi ) 6.16.1
1.000 m' Pipa GIP @ Rp. 132,806.66 = Rp 132,806.66
35.000 % Perlengkapan = Rp 46,482.33
Sub total : = Rp 179,288.99
Upah An. SNI ( Revisi ) 6.16.2
0.540 Oh Pekerja @ Rp. 80,000.00 = Rp 43,200.00
0.900 Oh Tukang @ Rp. 100,000.00 = Rp 90,000.00
0.090 Oh Kepala tukang @ Rp. 110,000.00 = Rp 9,900.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.100 Oh Tukang cat @ Rp. 100,000.00 = Rp 10,000.00
0.054 Oh Mandor @ Rp. 120,000.00 = Rp 6,480.00
Sub total : = Rp 184,580.00
Lain-lain K3 + CAR = Rp 1,091.61

Total upah+bahan : = Rp 364,960.60


Memasang 1 m' pipa BSP sch. 40 ø 4" (putih)
Bahan An. SNI ( Revisi ) 6.17.1
1.000 m' Pipa BSP sch 40 @ Rp. 179,666.66 = Rp 179,666.66
35.000 % Perlengkapan = Rp 62,883.33
Sub total : = Rp 242,549.99
Upah An. SNI ( Revisi ) 6.17.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.160 Oh Tukang cat @ Rp. 100,000.00 = Rp 16,000.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 55,958.00
Lain-lain K3 + CAR = Rp 895.52

Total upah+bahan : = Rp 299,403.51

Memasang 1 m' pipa BSP sch. 40 ø 10"


Bahan An. SNI ( Revisi ) 6.18.1
1.000 m' Pipa BSP sch 40 @ Rp. 1,996,500.00 = Rp 1,996,500.00
35.000 % Perlengkapan = Rp 698,775.00
Sub total : = Rp 2,695,275.00
Upah An. SNI ( Revisi ) 6.18.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.290 Oh Tukang las @ Rp. 100,000.00 = Rp 29,000.00
0.200 Oh Tukang cat @ Rp. 100,000.00 = Rp 20,000.00
0.007 Oh Mandor @ Rp. 120,000.00 = Rp 840.00
Sub total : = Rp 64,150.00
Total upah+bahan : = Rp 2,759,425.00
Memasang 1 m' pipa BSP sch. 40 ø 6" (putih)
Bahan An. SNI ( Revisi ) 6.17.1
1.000 m' Pipa BSP sch 40 @ Rp. 314,266.66 = Rp 314,266.66
35.000 % Perlengkapan = Rp 109,993.33
Sub total : = Rp 424,259.99
Upah An. SNI ( Revisi ) 6.17.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.160 Oh Tukang cat @ Rp. 100,000.00 = Rp 16,000.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 55,958.00
Lain-lain K3 + CAR = Rp 1,440.65

Total upah+bahan : = Rp 481,658.64


Memasang 1 m' pipa BSP sch. 40 ø 2" (putih)
Bahan An. SNI ( Revisi ) 6.17.1
1.000 m' Pipa BSP sch 40 @ Rp. 60,800.00 = Rp 60,800.00
35.000 % Perlengkapan = Rp 21,280.00
Sub total : = Rp 82,080.00
Upah An. SNI ( Revisi ) 6.17.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.160 Oh Tukang cat @ Rp. 100,000.00 = Rp 16,000.00
0.005 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 55,958.00
Lain-lain K3 + CAR = Rp 414.11

Total upah+bahan : = Rp 138,452.11


Memasang 1 unit Septic Tank 9 m3
Bahan An. SNI ( Revisi ) 6.33.1
1.000 unit Septic Tank Kap. 9 m3 @ Rp. 34,000,000.00 = Rp 34,000,000.00
5.000 % Perlengkapan = Rp 1,700,000.00
Sub total : = Rp 35,700,000.00
Upah An. SNI ( Revisi ) 6.32.2
2.000 Oh Pekerja @ Rp. 80,000.00 = Rp 160,000.00
2.000 Oh Tukang @ Rp. 100,000.00 = Rp 200,000.00
1.500 Oh Kepala tukang @ Rp. 110,000.00 = Rp 165,000.00
1.500 Oh Mandor @ Rp. 120,000.00 = Rp 180,000.00
Sub total : = Rp 705,000.00
Lain-lain K3 + CAR = Rp 109,215.00
Total upah+bahan : = Rp 36,514,215.00
Memasang 1 set Shallow Well Kap. 150 s/d 200 lpm
Bahan An. SNI ( Revisi ) 6.33.1
1.000 set deep well @ Rp. 26,000,000.00 = Rp 26,000,000.00
1.000 % Perlengkapan = Rp 260,000.00
Sub total : = Rp 26,260,000.00
Upah An. SNI ( Revisi ) 6.32.2
1.500 Oh Pekerja @ Rp. 80,000.00 = Rp 120,000.00
1.500 Oh Tukang @ Rp. 100,000.00 = Rp 150,000.00
1.000 Oh Kepala tukang @ Rp. 110,000.00 = Rp 110,000.00
1.000 Oh Mandor @ Rp. 120,000.00 = Rp 120,000.00
Sub total : = Rp 500,000.00
Lain-lain K3 + CAR = Rp 80,280.00

Total upah+bahan : = Rp 26,840,280.00

Memasang 1 unit sumur resapan


Bahan An. SNI ( Revisi ) 6.33.1
1.000 unit sumur resapan @ Rp. 1,200,000.00 = Rp 1,200,000.00
1.000 % Perlengkapan = Rp 12,000.00
Sub total : = Rp 1,212,000.00
Upah An. SNI ( Revisi ) 6.32.2
1.500 Oh Pekerja @ Rp. 80,000.00 = Rp 120,000.00
1.500 Oh Tukang @ Rp. 100,000.00 = Rp 150,000.00
1.000 Oh Kepala tukang @ Rp. 110,000.00 = Rp 110,000.00
1.000 Oh Mandor @ Rp. 120,000.00 = Rp 120,000.00
Sub total : = Rp 500,000.00
Lain-lain K3 + CAR = Rp 5,136.00

Total upah+bahan : = Rp 1,717,136.00


Memasang 1 unit Grease Trap
Bahan An. SNI ( Revisi ) 6.33.1
1.000 unit Grease Trap @ Rp. 200,000.00 = Rp 200,000.00
5.000 % Perlengkapan = Rp 10,000.00
Sub total : = Rp 210,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.380 Oh Pekerja @ Rp. 80,000.00 = Rp 30,400.00
0.700 Oh Tukang @ Rp. 100,000.00 = Rp 70,000.00
0.200 Oh Kepala tukang @ Rp. 110,000.00 = Rp 22,000.00
0.180 Oh Mandor @ Rp. 120,000.00 = Rp 21,600.00
Sub total : = Rp 144,000.00
Lain-lain K3 + CAR = Rp 1,062.00

Total upah+bahan : = Rp 355,062.00


Memasang 1 bh Pressure Gauge
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Pressure Gauge @ Rp. 140,000.00 = Rp 140,000.00
10.000 % Perlengkapan = Rp 14,000.00
Sub total : = Rp 154,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Tukang @ Rp. 110,000.00 = Rp 5,500.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 10,516.00
Lain-lain K3 + CAR = Rp 493.55

Total upah+bahan : = Rp 165,009.55


Memasang 1 bh Meter Air c/w BV dia 20 mm
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Meter Air 20 mm @ Rp. 260,000.00 = Rp 260,000.00
10.000 % Perlengkapan = Rp 26,000.00
Sub total : = Rp 286,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Tukang @ Rp. 110,000.00 = Rp 5,500.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 10,516.00
Lain-lain K3 + CAR = Rp 889.55

Total upah+bahan : = Rp 297,405.55


Memasang 1 bh Meter Air c/w BV dia 50 mm
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Meter Air 50 mm @ Rp. 480,000.00 = Rp 480,000.00
10.000 % Perlengkapan = Rp 48,000.00
Sub total : = Rp 528,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.050 Oh Pekerja @ Rp. 80,000.00 = Rp 4,000.00
0.050 Oh Tukang @ Rp. 110,000.00 = Rp 5,500.00
0.010 Oh Kepala tukang @ Rp. 80,000.00 = Rp 800.00
0.002 Oh Mandor @ Rp. 120,000.00 = Rp 216.00
Sub total : = Rp 10,516.00
Lain-lain K3 + CAR = Rp 1,615.55

Total upah+bahan : = Rp 540,131.55


Memasang 1 bh Vent Cup dia. 50 mm
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Vent Cup dia. 50 mm @ Rp. 16,000.00 = Rp 16,000.00
10.000 % Perlengkapan = Rp 1,600.00
Sub total : = Rp 17,600.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 150.30

Total upah+bahan : = Rp 50,250.30

Memasang 1 bh Dop dia. 100 mm


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Dop dia. 100 mm @ Rp. 22,000.00 = Rp 22,000.00
10.000 % Perlengkapan = Rp 2,200.00
Sub total : = Rp 24,200.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 170.10

Total upah+bahan : = Rp 56,870.10


Memasang 1 bh Vent Cup dia. 80 mm
Bahan An. SNI ( Revisi ) 6.33.1
1 bh Vent Cup dia. 80 mm@ Rp. 20,000.00 = Rp 20,000.00
10 % Perlengkapan = Rp 2,000.00
Sub total : = Rp 22,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 163.50

Total upah+bahan : = Rp 54,663.50

Memasang 1 bh Dop dia. 150 mm


Bahan An. SNI ( Revisi ) 6.33.1
1 bh Dop dia. 150 mm @ Rp. 28,000.00 = Rp 28,000.00
10 % Perlengkapan = Rp 2,800.00
Sub total : = Rp 30,800.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 189.90

Total upah+bahan : = Rp 63,489.90


Memasang HEADER pipa BSP sch. 40 ø 8" (putih)
Bahan An. SNI ( Revisi ) 6.17.1
4.000 m' Pipa BSP sch 40 @ Rp. 498,000.00 = Rp 1,992,000.00
35 % Perlengkapan = Rp 174,300.00
Sub total : = Rp 2,166,300.00
Upah An. SNI ( Revisi ) 6.17.2
0.054 Oh Pekerja @ Rp. 80,000.00 = Rp 4,320.00
0.090 Oh Tukang @ Rp. 100,000.00 = Rp 9,000.00
0.009 Oh Kepala tukang @ Rp. 110,000.00 = Rp 990.00
0.250 Oh Tukang las @ Rp. 100,000.00 = Rp 25,000.00
0.160 Oh Tukang cat @ Rp. 100,000.00 = Rp 16,000.00
0.0054 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 55,958.00
Lain-lain K3 + CAR = Rp 6,666.77

Total upah+bahan : = Rp 2,228,924.77


Memasang 1 m' pipa PVC D ø 4"
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC D @ Rp. 22,687.50 = Rp 22,687.50
35 % Perlengkapan = Rp 7,940.62
Sub total : = Rp 30,628.13
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 80,000.00 = Rp 10,800.00
0.225 Oh Tukang @ Rp. 100,000.00 = Rp 22,500.00
0.0225 Oh Kepala tukang @ Rp. 110,000.00 = Rp 2,475.00
0.0068 Oh Mandor @ Rp. 120,000.00 = Rp 816.00
Sub total : = Rp 36,591.00
Total upah+bahan : = Rp 67,219.13

Memasang 1 m' pipa PVC D ø 3"


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC D @ Rp. 15,187.50 = Rp 15,187.50
35 % Perlengkapan = Rp 5,315.63
Sub total : = Rp 20,503.13
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 80,000.00 = Rp 10,800.00
0.225 Oh Tukang @ Rp. 100,000.00 = Rp 22,500.00
0.0225 Oh Kepala tukang @ Rp. 110,000.00 = Rp 2,475.00
0.0068 Oh Mandor @ Rp. 120,000.00 = Rp 816.00
Sub total : = Rp 36,591.00
Total upah+bahan : = Rp 57,094.13
Memasang 1 m' pipa PVC D ø 2"
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m' Pipa PVC D @ Rp. 10,450.00 = Rp 10,450.00
35 % Perlengkapan = Rp 3,657.50
Sub total : = Rp 14,107.50
Upah An. SNI ( Revisi ) 6.8.2
0.135 Oh Pekerja @ Rp. 80,000.00 = Rp 10,800.00
0.225 Oh Tukang @ Rp. 100,000.00 = Rp 22,500.00
0.0225 Oh Kepala tukang @ Rp. 110,000.00 = Rp 2,475.00
0.0068 Oh Mandor @ Rp. 120,000.00 = Rp 816.00
Sub total : = Rp 36,591.00
Total upah+bahan : = Rp 50,698.50
Memasang 1 m' pipa PPR PN-10 ø 2"
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 89,677.50 = Rp 89,677.50
35 % Perlengkapan = Rp 31,387.12
Sub total : = Rp 121,064.63
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.0054 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 150,332.63
Memasang 1 m' pipa PPR PN-10 ø 1,25"
Bahan An. SNI ( Revisi ) 6.4.1
1.000 m' Pipa PPR PN-10 @ Rp. 36,520.00 = Rp 36,520.00
35 % Perlengkapan = Rp 12,782.00
Sub total : = Rp 49,302.00
Upah An. SNI ( Revisi ) 6.4.2
0.108 Oh Pekerja @ Rp. 80,000.00 = Rp 8,640.00
0.180 Oh Tukang @ Rp. 100,000.00 = Rp 18,000.00
0.018 Oh Kepala tukang @ Rp. 110,000.00 = Rp 1,980.00
0.0054 Oh Mandor @ Rp. 120,000.00 = Rp 648.00
Sub total : = Rp 29,268.00
Total upah+bahan : = Rp 78,570.00
ANALISA ELEKTRIKAL
Memasang 1 buah instalasi titik Lampu
Bahan An. SNI ( Revisi ) 6.1.1
8.000 m Kabel NYM 3x2,5 mm2 @ Rp. 5,701.60 = Rp 45,612.80
6.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 9,600.00
5.000 % Perlengkapan instalasi = Rp 2,760.64
Sub total : = Rp 57,973.44
Upah An. SNI ( Revisi ) 6.1.2
0.150 Oh Pembantu tukang listrik @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.180 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 19,800.00
0.150 Oh Mandor @ Rp. 120,000.00 = Rp 18,000.00
Sub total : = Rp 64,800.00

Lain-lain K3 + CAR = Rp 368.32

Total upah+bahan : = Rp 123,141.76


Memasang 1 buah instalasi titik Lampu Luar
Bahan An. SNI ( Revisi ) 6.3.1
15.000 m Kabel NYFGBY 3x2,5 mm2 @ Rp. 10,042.00 = Rp 150,630.00
5.000 % Perlengkapan instalasi = Rp 7,531.50
Sub total : = Rp 158,161.50
Upah An. SNI ( Revisi ) 6.3.2
0.035 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,800.00
0.035 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,806.00
Lain-lain K3 + CAR = Rp 503.90

Total upah+bahan : = Rp 168,471.40

Memasang 1 buah Instalasi titik Stop Kontak


Bahan An. SNI ( Revisi ) 6.4.1
11.000 m Kabel NYM 3x2,5 mm2 @ Rp. 5,701.60 = Rp 62,717.60
9.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 14,400.00
5.000 % Perlengkapan instalasi = Rp 3,855.88
Sub total : = Rp 80,973.48
Upah An. SNI ( Revisi ) 6.4.2
0.150 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.180 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 19,800.00
0.150 Oh Mandor @ Rp. 120,000.00 = Rp 18,000.00
Sub total : = Rp 64,800.00
Lain-lain K3 + CAR = Rp 437.32

Total upah+bahan : = Rp 146,210.80


Memasang 1 buah Instalasi titik AC
Bahan An. SNI ( Revisi ) 6.4.1
15.000 m Kabel NYM 3x2,5 mm2 @ Rp. 5,701.60 = Rp 85,524.00
13.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 20,800.00
5.000 % Perlengkapan instalasi = Rp 5,316.20
Sub total : = Rp 111,640.20
Upah An. SNI ( Revisi ) 6.4.2
0.150 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.180 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 19,800.00
0.150 Oh Mandor @ Rp. 120,000.00 = Rp 18,000.00
Sub total : = Rp 64,800.00
Lain-lain K3 + CAR = Rp 529.32

Total upah+bahan : = Rp 176,969.52


Memasang 1 buah Instalasi titik Detector
Bahan An. SNI ( Revisi ) 6.5.1
15.000 m Kabel NYA 2x1,5 mm2 @ Rp. 2,270.40 = Rp 34,056.00
12.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 19,200.00
5.000 % Perlengkapan instalasi = Rp 2,662.80
Sub total : = Rp 55,918.80
Upah An. SNI ( Revisi ) 6.5.2
0.150 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.180 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 19,800.00
0.150 Oh Mandor @ Rp. 120,000.00 = Rp 18,000.00
Sub total : = Rp 64,800.00
Lain-lain K3 + CAR = Rp 362.16

Total upah+bahan : = Rp 121,080.96

Memasang 1 buah Instalasi titik TV


Bahan An. SNI ( Revisi ) 6.6.1
15.000 m Kabel Coaxial 5V-2C @ Rp. 4,242.00 = Rp 63,630.00
15.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 24,000.00
5.000 % Perlengkapan instalasi = Rp 4,381.50
Sub total : = Rp 92,011.50
Upah An. SNI ( Revisi ) 6.6.2
0.150 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.180 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 19,800.00
0.150 Oh Mandor @ Rp. 120,000.00 = Rp 18,000.00
Sub total : = Rp 64,800.00
Lain-lain K3 + CAR = Rp 470.43

Total upah+bahan : = Rp 157,281.93


Memasang 1 buah Insalasi titik Telepon
Bahan An. SNI ( Revisi ) 6.7.1
12.000 m Kabel ITC 4x0,6 mm @ Rp. 2,240.00 = Rp 26,880.00
12.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 19,200.00
5.000 % Perlengkapan instalasi = Rp 2,304.00
Sub total : = Rp 48,384.00
Upah An. SNI ( Revisi ) 6.7.2
0.150 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.180 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 19,800.00
0.150 Oh Mandor @ Rp. 120,000.00 = Rp 18,000.00
Sub total : = Rp 64,800.00
Lain-lain K3 + CAR = Rp 339.55

Total upah+bahan : = Rp 113,523.55

Memasang 1 M Kabel Power ( NYM 3x2,5 mm )


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m NYM 3x2,5 mm @ Rp. 5,701.60 = Rp 5,701.60
1.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 1,600.00
5.000 % Perlengkapan instalasi = Rp 365.08
Sub total : = Rp 7,666.68
Upah An. SNI ( Revisi ) 6.8.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 47.02

Total upah+bahan : = Rp 15,719.70


Memasang 1 M Kabel Power ( NYM 3x4 mm )
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m NYM 3x4 mm @ Rp. 7,700.00 = Rp 7,700.00
1.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 1,600.00
5.000 % Perlengkapan instalasi = Rp 465.00
Sub total : = Rp 9,765.00
Upah An. SNI ( Revisi ) 6.8.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 53.31

Total upah+bahan : = Rp 17,824.31

Memasang 1 M Kabel Power ( NYY 4x2,5 mm + NYA 2,5 mm )


Bahan An. SNI ( Revisi ) 6.9.1
1.000 m NYY 4x2,5 mm @ Rp. 9,216.00 = Rp 9,216.00
1.000 m NYA 2,5 mm @ Rp. 1,796.80 = Rp 1,796.80
5.000 % Perlengkapan instalasi = Rp 550.64
Sub total : = Rp 11,563.44
Upah An. SNI ( Revisi ) 6.9.2
0.030 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,400.00
0.030 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,000.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,906.00
Lain-lain K3 + CAR = Rp 61.41

Total upah+bahan : = Rp 20,530.85


Memasang 1 M Kabel Power ( NYY 4x4 mm + NYA 4 mm )
Bahan An. SNI ( Revisi ) 6.10.1
1.000 m NYY 4x4 mm @ Rp. 13,889.20 = Rp 13,889.20
1.000 m NYA 4 mm @ Rp. 2,858.80 = Rp 2,858.80
5.000 % Perlengkapan instalasi = Rp 837.40
Sub total : = Rp 17,585.40
Upah An. SNI ( Revisi ) 6.9.2
0.030 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,400.00
0.030 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,000.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,906.00
Lain-lain K3 + CAR = Rp 79.47

Total upah+bahan : = Rp 26,570.87

Memasang 1 M Kabel Power ( NYY 4x6 mm + NYA 6 mm )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 4x6 mm @ Rp. 19,353.60 = Rp 19,353.60
1.000 m NYA 6 mm @ Rp. 4,279.60 = Rp 4,279.60
5.000 % Perlengkapan instalasi = Rp 1,181.66
Sub total : = Rp 24,814.86
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 102.51

Total upah+bahan : = Rp 34,273.37


Memasang 1 M Kabel Power ( NYY 4x10 mm + NYA 6 mm )
Bahan An. SNI ( Revisi ) 6.11.1
1.000 m NYY 4x10 mm @ Rp. 26,800.00 = Rp 26,800.00
1.000 m NYA 6 mm @ Rp. 4,279.60 = Rp 4,279.60
5.000 % Perlengkapan instalasi = Rp 1,553.98
Sub total : = Rp 32,633.58
Upah An. SNI ( Revisi ) 6.11.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 125.97

Total upah+bahan : = Rp 42,115.55

Memasang 1 M Kabel Power ( NYY 4x16 mm + NYA 10 mm )


Bahan An. SNI ( Revisi ) 6.12.1
1.000 m NYY 4x16 mm @ Rp. 47,080.00 = Rp 47,080.00
1.000 m NYA 10 mm @ Rp. 7,160.00 = Rp 7,160.00
5.000 % Perlengkapan instalasi = Rp 2,712.00
Sub total : = Rp 56,952.00
Upah An. SNI ( Revisi ) 6.12.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 198.92

Total upah+bahan : = Rp 66,506.92


Memasang 1 M Kabel Power ( NYY 4x70 mm + NYA 35 mm )
Bahan An. SNI ( Revisi ) 6.12.1
1.000 m NYY 4x70 mm @ Rp. 188,280.00 = Rp 188,280.00
1.000 m NYA 35 mm @ Rp. 23,320.00 = Rp 23,320.00
5.000 % Perlengkapan instalasi = Rp 10,580.00
Sub total : = Rp 222,180.00
Upah An. SNI ( Revisi ) 6.12.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 694.61

Total upah+bahan : = Rp 232,230.61

Memasang 1 M Kabel Power ( NYFGBY 3x2,5 mm + NYA 10 mm )


Bahan An. SNI ( Revisi ) 6.13.1
1.000 m NYFGBY 3x2,5 mm @ Rp. 10,042.00 = Rp 10,042.00
1.000 m NYA 10 mm @ Rp. 7,160.00 = Rp 7,160.00
5.000 % Perlengkapan instalasi = Rp 860.10
Sub total : = Rp 18,062.10
Upah An. SNI ( Revisi ) 6.13.2
0.040 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Tukang listrik @ Rp. 100,000.00 = Rp 4,000.00
0.025 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 2,750.00
0.025 Oh Mandor @ Rp. 120,000.00 = Rp 3,000.00
Sub total : = Rp 12,950.00
Lain-lain K3 + CAR = Rp 93.04

Total upah+bahan : = Rp 31,105.14


Memasang Kabel Tray ( W=200 mm )
Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Tray w=200 mm @ Rp. 93,000.00 = Rp 93,000.00
5.000 % Perlengkapan instalasi = Rp 4,650.00
Sub total : = Rp 97,650.00
Upah An. SNI ( Revisi ) 6.14.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 316.97

Total upah+bahan : = Rp 105,972.97

Memasang Tee Kabel Tray ( W=200 mm )


Bahan An. SNI ( Revisi ) 6.15.1
1.000 bh TEE w=200 mm @ Rp. 128,200.00 = Rp 128,200.00
5.000 % Perlengkapan instalasi = Rp 6,410.00
Sub total : = Rp 134,610.00
Upah An. SNI ( Revisi ) 6.15.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 427.85

Total upah+bahan : = Rp 143,043.85


Memasang Elbow Kabel Tray ( W=200 mm )
Bahan An. SNI ( Revisi ) 6.15.1
1.000 bh Elbow w=200 mm @ Rp. 119,120.00 = Rp 119,120.00
5.000 % Perlengkapan instalasi = Rp 5,956.00
Sub total : = Rp 125,076.00
Upah An. SNI ( Revisi ) 6.15.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 399.25

Total upah+bahan : = Rp 133,481.25

Memasang Splitter TV
Bahan An. SNI ( Revisi ) 6.16.1
1.000 bh Splitter 6 port @ Rp. 49,934.40 = Rp 49,934.40
5.000 % Perlengkapan instalasi = Rp 2,496.72
Sub total : = Rp 52,431.12
Upah An. SNI ( Revisi ) 6.16.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 181.31

Total upah+bahan : = Rp 60,618.43


Memasang Penangkal Petir
Bahan An. SNI ( Revisi ) 6.17.1
1.000 bh Splitzen T=1 mtr @ Rp. 140,000.00 = Rp 140,000.00
5.000 % Perlengkapan instalasi = Rp 7,000.00
Sub total : = Rp 147,000.00
Upah An. SNI ( Revisi ) 6.17.2
0.750 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 60,000.00
1.000 Oh Tukang listrik @ Rp. 100,000.00 = Rp 100,000.00
0.600 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 66,000.00
0.400 Oh Mandor @ Rp. 120,000.00 = Rp 48,000.00
Sub total : = Rp 274,000.00
Lain-lain K3 + CAR = Rp 1,263.00

Total upah+bahan : = Rp 422,263.00

Memasang Tiang Pipa dia 65 = 5 mtr + asesories


Bahan An. SNI ( Revisi ) 6.17.1
5.000 bh Tiang pipa dia 65 @ Rp. 140,000.00 = Rp 700,000.00
5.000 % Perlengkapan instalasi = Rp 35,000.00
Sub total : = Rp 735,000.00
Upah An. SNI ( Revisi ) 6.17.2
0.750 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 60,000.00
1.000 Oh Tukang listrik @ Rp. 100,000.00 = Rp 100,000.00
0.600 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 66,000.00
0.400 Oh Mandor @ Rp. 120,000.00 = Rp 48,000.00
Sub total : = Rp 274,000.00
Lain-lain K3 + CAR = Rp 3,027.00

Total upah+bahan : = Rp 1,012,027.00


Memasang Stop Kontak daya
Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak 6 A @ Rp. 15,250.00 = Rp 15,250.00
5.000 % Perlengkapan instalasi = Rp 762.50
Sub total : = Rp 16,012.50
Upah An. SNI ( Revisi ) 6.18.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 72.06

Total upah+bahan : = Rp 24,090.56

Memasang Stop Kontak-AC


Bahan An. SNI ( Revisi ) 6.18.1
1.000 bh Stop kontak-AC @ Rp. 26,000.00 = Rp 26,000.00
5.000 % Perlengkapan instalasi = Rp 1,300.00
Sub total : = Rp 27,300.00
Upah An. SNI ( Revisi ) 6.18.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 105.92

Total upah+bahan : = Rp 35,411.92


Memasang Stop Kontak-TV
Bahan An. SNI ( Revisi ) 6.19.1
1.000 bh Stop kontak-TV @ Rp. 25,210.00 = Rp 25,210.00
5.000 % Perlengkapan instalasi = Rp 1,260.50
Sub total : = Rp 26,470.50
Upah An. SNI ( Revisi ) 6.19.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 103.43

Total upah+bahan : = Rp 34,579.93

Memasang Stop Kontak-TELEPON


Bahan An. SNI ( Revisi ) 6.20.1
1.000 bh Stop kontak-TELEPON @ Rp. 16,726.00 = Rp 16,726.00
5.000 % Perlengkapan instalasi = Rp 836.30
Sub total : = Rp 17,562.30
Upah An. SNI ( Revisi ) 6.20.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 76.70

Total upah+bahan : = Rp 25,645.00


Memasang Saklar tunggal
Bahan An. SNI ( Revisi ) 6.21.1
1.000 bh saklar tunggal @ Rp. 10,800.00 = Rp 10,800.00
5.000 % Perlengkapan instalasi = Rp 540.00
Sub total : = Rp 11,340.00
Upah An. SNI ( Revisi ) 6.21.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 58.04

Total upah+bahan : = Rp 19,404.04

Memasang Sakalr Ganda


Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar ganda @ Rp. 18,000.00 = Rp 18,000.00
5.000 % Perlengkapan instalasi = Rp 900.00
Sub total : = Rp 18,900.00
Upah An. SNI ( Revisi ) 6.22.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 80.72

Total upah+bahan : = Rp 26,986.72


Memasang Saklar Hotel 1 gang
Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar Hotel 1 gang @ Rp. 18,880.00 = Rp 18,880.00
5.000 % Perlengkapan instalasi = Rp 944.00
Sub total : = Rp 19,824.00
Upah An. SNI ( Revisi ) 6.22.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 83.49

Total upah+bahan : = Rp 27,913.49

Memasang Saklar Hotel 2 gang


Bahan An. SNI ( Revisi ) 6.22.1
1.000 bh Saklar Hotel 2 gang @ Rp. 28,000.00 = Rp 28,000.00
5.000 % Perlengkapan instalasi = Rp 1,400.00
Sub total : = Rp 29,400.00
Upah An. SNI ( Revisi ) 6.22.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 112.22

Total upah+bahan : = Rp 37,518.22


Memasang Manual push button
Bahan An. SNI ( Revisi ) 6.23.1
1.000 bh manual push button @ Rp. 84,000.00 = Rp 84,000.00
5.000 % Perlengkapan instalasi = Rp 4,200.00
Sub total : = Rp 88,200.00
Upah An. SNI ( Revisi ) 6.23.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 288.62

Total upah+bahan : = Rp 96,494.62

Memasang 1 buah instalasi titik Manual PUSH BUTTON


Bahan An. SNI ( Revisi ) 6.24.1
20.000 m Kabel NYA 2x1,5 mm2 @ Rp. 2,270.40 = Rp 45,408.00
20.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 32,000.00
5.000 % Perlengkapan instalasi = Rp 3,870.40
Sub total : = Rp 81,278.40
Upah An. SNI ( Revisi ) 6.24.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 267.85

Total upah+bahan : = Rp 89,552.25


Memasang Bell Alarm
Bahan An. SNI ( Revisi ) 6.25.1
1.000 bh Bell Alarm @ Rp. 158,800.00 = Rp 158,800.00
5.000 % Perlengkapan instalasi = Rp 7,940.00
Sub total : = Rp 166,740.00
Upah An. SNI ( Revisi ) 6.25.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 524.24

Total upah+bahan : = Rp 175,270.24

Memasang 1 buah instalasi titik Bell Alarm


Bahan An. SNI ( Revisi ) 6.26.1
20.000 m Kabel NYA 2x1,5 mm2 @ Rp. 2,270.40 = Rp 45,408.00
20.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 32,000.00
5.000 % Perlengkapan instalasi = Rp 3,870.40
Sub total : = Rp 81,278.40
Upah An. SNI ( Revisi ) 6.26.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 267.85

Total upah+bahan : = Rp 89,552.25


Memasang Lampu indikator
Bahan An. SNI ( Revisi ) 6.27.1
1.000 bh Indikator Lamp @ Rp. 74,000.00 = Rp 74,000.00
5.000 % Perlengkapan instalasi = Rp 3,700.00
Sub total : = Rp 77,700.00
Upah An. SNI ( Revisi ) 6.27.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 257.12

Total upah+bahan : = Rp 85,963.12

Memasang 1 buah instalasi titik Lampu indikator


Bahan An. SNI ( Revisi ) 6.28.1
20.000 m Kabel NYA 2x2,5 mm2 @ Rp. 3,593.60 = Rp 71,872.00
20.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 32,000.00
% Perlengkapan instalasi = Rp 3,870.40
Sub total : = Rp 107,742.40
Upah An. SNI ( Revisi ) 6.28.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 347.25

Total upah+bahan : = Rp 116,095.65


Memasang MCFA
Bahan An. SNI ( Revisi ) 6.29.1
1.000 bh MCFA-10 Zone @ Rp. 3,308,000.00 = Rp 3,308,000.00
5.000 % Perlengkapan instalasi = Rp 165,400.00
Sub total : = Rp 3,473,400.00
Upah An. SNI ( Revisi ) 6.29.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 10,526.71

Total upah+bahan : = Rp 3,519,428.71

Memasang Lampu Taman (t=1,5 m)


Bahan An. SNI ( Revisi ) 6.30.1
1.000 bh Lampu Taman-SL26W @ Rp. 340,000.00 = Rp 340,000.00
1.000 lt Tiang Lampu 1.5 m @ Rp. 200,000.00 = Rp 200,000.00
5.000 % Perlengkapan instalasi = Rp 17,000.00
Sub total : = Rp 557,000.00
Upah An. SNI ( Revisi ) 6.30.2
0.200 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 16,000.00
0.250 Oh Tukang listrik @ Rp. 100,000.00 = Rp 25,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 61,000.00
Lain-lain K3 + CAR = Rp 1,854.00

Total upah+bahan : = Rp 619,854.00


Memasang Lampu Taman (t=2,5 m)
Bahan An. SNI ( Revisi ) 6.30.1
1.000 bh Lampu Taman-SL26W @ Rp. 340,000.00 = Rp 340,000.00
1.000 lt Tiang Lampu 2.5 m @ Rp. 300,000.00 = Rp 300,000.00
5.000 % Perlengkapan instalasi = Rp 17,000.00
Sub total : = Rp 657,000.00
Upah An. SNI ( Revisi ) 6.30.2
0.250 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 20,000.00
0.300 Oh Tukang listrik @ Rp. 100,000.00 = Rp 30,000.00
0.150 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 16,500.00
0.100 Oh Mandor @ Rp. 120,000.00 = Rp 12,000.00
Sub total : = Rp 78,500.00
Lain-lain K3 + CAR = Rp 2,206.50

Total upah+bahan : = Rp 737,706.50

Memasang Lampu SL-13 watt


Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu SL 13w @ Rp. 48,000.00 = Rp 48,000.00
1.000 bh Fitting @ Rp. 3,400.00 = Rp 3,400.00
5.000 % Perlengkapan instalasi = Rp 2,400.00
Sub total : = Rp 53,800.00
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 4,000.00
0.075 Oh Tukang listrik @ Rp. 100,000.00 = Rp 7,500.00
0.040 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 4,400.00
0.030 Oh Mandor @ Rp. 120,000.00 = Rp 3,600.00
Sub total : = Rp 19,500.00
Lain-lain K3 + CAR = Rp 219.90

Total upah+bahan : = Rp 73,519.90


Memasang Lampu Pijar-40 watt
Bahan An. SNI ( Revisi ) 6.32.1
1.000 bh Lampu -Pijar 40W @ Rp. 4,030.00 = Rp 4,030.00
5.000 % Perlengkapan instalasi = Rp 201.50
Sub total : = Rp 4,231.50
Upah An. SNI ( Revisi ) 6.32.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Total upah+bahan : = Rp 39,733.50

Memasang Lampu T-Bulk-18 watt


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Lampu TL Bulk-18W @ Rp. 100,000.00 = Rp 100,000.00
5.000 % Perlengkapan instalasi = Rp 5,000.00
Sub total : = Rp 105,000.00
Upah An. SNI ( Revisi ) 6.33.2
0.120 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 9,600.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 44,600.00
Lain-lain K3 + CAR = Rp 448.80

Total upah+bahan : = Rp 150,048.80


Memasang Lampu T-Bulk-36 watt
Bahan An. SNI ( Revisi ) 6.34.1
1.000 bh Lampu TL Bulk-36W @ Rp. 180,000.00 = Rp 180,000.00
5.000 % Perlengkapan instalasi = Rp 9,000.00
Sub total : = Rp 189,000.00
Upah An. SNI ( Revisi ) 6.34.2
0.120 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 9,600.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 44,600.00
Lain-lain K3 + CAR = Rp 700.80

Total upah+bahan : = Rp 234,300.80

Memasang Lampu Baret-32 watt C/W BATTERY CHARGER


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Baret-32w @ Rp. 271,000.00 = Rp 271,000.00
5.000 % Perlengkapan instalasi = Rp 13,550.00
Sub total : = Rp 284,550.00
Upah An. SNI ( Revisi ) 6.35.2
0.150 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 12,000.00
0.200 Oh Tukang listrik @ Rp. 100,000.00 = Rp 20,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 52,000.00
Lain-lain K3 + CAR = Rp 1,009.65

Total upah+bahan : = Rp 337,559.65


Memasang Lampu Baret-32 W
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Baret-32w @ Rp. 91,000.00 = Rp 91,000.00
5.000 % Perlengkapan instalasi = Rp 4,550.00
Sub total : = Rp 95,550.00
Upah An. SNI ( Revisi ) 6.35.2
0.120 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 9,600.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 44,600.00
Lain-lain K3 + CAR = Rp 420.45

Total upah+bahan : = Rp 140,570.45

Memasang Lampu PL 7 Watt Fitting E27


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Pl-7w @ Rp. 28,000.00 = Rp 28,000.00
1.000 bh fittings @ Rp. 17,000.00 = Rp 17,000.00
5.000 % Perlengkapan instalasi = Rp 1,400.00
Sub total : = Rp 46,400.00
Upah An. SNI ( Revisi ) 6.35.2
0.010 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 800.00
0.010 Oh Tukang listrik @ Rp. 100,000.00 = Rp 1,000.00
0.001 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 110.00
0.001 Oh Mandor @ Rp. 120,000.00 = Rp 120.00
Sub total : = Rp 2,030.00
Total upah+bahan : = Rp 48,430.00
Memasang Panel Unit
Bahan An. SNI ( Revisi ) 6.36.1
1.000 bh Box hager @ Rp. 90,673.00 = Rp 90,673.00
2.000 bh MCB,1p, 6A @ Rp. 50,395.00 = Rp 100,790.00
5.000 % Perlengkapan instalasi = Rp 9,573.15
Sub total : = Rp 201,036.15
Upah An. SNI ( Revisi ) 6.36.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Total upah+bahan : = Rp 209,042.15

Memasang GENSET
Bahan An. SNI ( Revisi ) 6.37.1
1.000 bh Genset-25 kVA @ Rp. 107,879,110.00 = Rp 107,879,110.00
5.000 % Perlengkapan instalasi = Rp 5,393,955.50
Sub total : = Rp 113,273,065.50
Upah An. SNI ( Revisi ) 6.37.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Total upah+bahan : = Rp 113,308,567.50
Memasang Lampu Exit-18 W c/w Battery Charger
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Exit-18w @ Rp. 290,000.00 = Rp 290,000.00
5.000 % Perlengkapan instalasi = Rp 14,500.00
Sub total : = Rp 304,500.00
Upah An. SNI ( Revisi ) 6.35.2
0.120 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 9,600.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 44,600.00
Lain-lain K3 + CAR = Rp 1,047.30

Total upah+bahan : = Rp 350,147.30

Memasang 1 buah Grounding box


Bahan An. SNI ( Revisi ) 6.38.1
1.000 bh Box 40x40x40cm @ Rp. 180,000.00 = Rp 180,000.00
5.000 % Perlengkapan instalasi = Rp 9,000.00
Sub total : = Rp 189,000.00
Upah An. SNI ( Revisi ) 6.38.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 673.51

Total upah+bahan : = Rp 225,175.51


Memasang 1 buah Grounding Rod Gip 1"
Bahan An. SNI ( Revisi ) 6.39.1
1.000 bh gronding rod Gip 1" @ Rp. 260,000.00 = Rp 260,000.00
5.000 % Perlengkapan instalasi = Rp 13,000.00
Sub total : = Rp 273,000.00
Upah An. SNI ( Revisi ) 6.39.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 925.51

Total upah+bahan : = Rp 309,427.51

Memasang 1 buah Termination


Bahan An. SNI ( Revisi ) 6.39.1
1.000 ls Termination @ Rp. 300,000.00 = Rp 300,000.00
5.000 % Perlengkapan instalasi = Rp 15,000.00
Sub total : = Rp 315,000.00
Upah An. SNI ( Revisi ) 6.39.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 1,051.51

Total upah+bahan : = Rp 351,553.51


Memasang 1 M Kabel pentanahan ( BC 50 mm )
Bahan An. SNI ( Revisi ) 6.40.1
1.000 m BC-50 mm @ Rp. 49,020.00 = Rp 49,020.00
5.000 % Perlengkapan instalasi = Rp 2,451.00
Sub total : = Rp 51,471.00
Upah An. SNI ( Revisi ) 6.40.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 182.48

Total upah+bahan : = Rp 61,009.48

Memasang 1 M Kabel pentanahan ( NYY 70 mm )


Bahan An. SNI ( Revisi ) 6.41.1
1.000 m NYY 70 mm @ Rp. 101,116.00 = Rp 101,116.00
5.000 % Perlengkapan instalasi = Rp 5,055.80
Sub total : = Rp 106,171.80
Upah An. SNI ( Revisi ) 6.41.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Total upah+bahan : = Rp 141,673.80
Memasang 1 buah Terminal Box Telepon
Bahan An. SNI ( Revisi ) 6.42.1
1.000 bh Terminal @ Rp. 418,898.00 = Rp 418,898.00
5.000 % Perlengkapan instalasi = Rp 20,944.90
Sub total : = Rp 439,842.90
Upah An. SNI ( Revisi ) 6.42.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Total upah+bahan : = Rp 475,344.90
Memasang 1 buah Terminal Box TV
Bahan An. SNI ( Revisi ) 6.43.1
1.000 bh Terminal TV @ Rp. 100,140.00 = Rp 100,140.00
5.000 % Perlengkapan instalasi = Rp 5,007.00
Sub total : = Rp 105,147.00
Upah An. SNI ( Revisi ) 6.43.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 343.51

Total upah+bahan : = Rp 114,846.51


Memasang 1 buah Terminal Fire Alarm
Bahan An. SNI ( Revisi ) 6.44.1
1.000 bh Terminal Fire Alarm @ Rp. 132,000.00 = Rp 132,000.00
5.000 % Perlengkapan instalasi = Rp 6,600.00
Sub total : = Rp 138,600.00
Upah An. SNI ( Revisi ) 6.44.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 443.87

Total upah+bahan : = Rp 148,399.87

Memasang 1 buah Antena UHF


Bahan An. SNI ( Revisi ) 6.45.1
1.000 bh Antena UHF @ Rp. 271,488.00 = Rp 271,488.00
5.000 % Perlengkapan instalasi = Rp 13,574.40
Sub total : = Rp 285,062.40
Upah An. SNI ( Revisi ) 6.45.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 883.26

Total upah+bahan : = Rp 295,301.66


Memasang 1 buah Antena VHF
Bahan An. SNI ( Revisi ) 6.46.1
1.000 bh Antena UHF @ Rp. 312,635.60 = Rp 312,635.60
5.000 % Perlengkapan instalasi = Rp 15,631.78
Sub total : = Rp 328,267.38
Upah An. SNI ( Revisi ) 6.46.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 1,012.87

Total upah+bahan : = Rp 338,636.25

Memasang Master Amplifier ( MIXER )


Bahan An. SNI ( Revisi ) 6.47.1
1.000 m Master Amplifier @ Rp. 187,496.40 = Rp 187,496.40
5.000 % Perlengkapan instalasi = Rp 9,374.82
Sub total : = Rp 196,871.22
Upah An. SNI ( Revisi ) 6.47.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Total upah+bahan : = Rp 232,373.22
Memasang 1 M Kabel Coaxial ( 7c-2v mm )
Bahan An. SNI ( Revisi ) 6.48.1
1.000 m Coaxial 7c-2v @ Rp. 6,363.20 = Rp 6,363.20
5.000 % Perlengkapan instalasi = Rp 318.16
Sub total : = Rp 6,681.36
Upah An. SNI ( Revisi ) 6.48.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 44.06

Total upah+bahan : = Rp 14,731.42

Memasang MDF-FA ( 10 zone )


Bahan An. SNI ( Revisi ) 6.49.1
1.000 Bh MDF-FA @ Rp. 550,000.00 = Rp 550,000.00
5.000 % Perlengkapan instalasi = Rp 27,500.00
Sub total : = Rp 577,500.00
Upah An. SNI ( Revisi ) 6.49.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 1,839.01

Total upah+bahan : = Rp 614,841.01


Memasang 1 M Kabel Power fire alarm ( NYA 5x2x2,5 mm )
Bahan An. SNI ( Revisi ) 6.50.1
1.000 m NYA 5x2x2,5 mm @ Rp. 17,968.00 = Rp 17,968.00
1.000 m Conduit pipa dia. 32 @ Rp. 600,000.00 = Rp 600,000.00
5.000 % Perlengkapan instalasi = Rp 30,898.40
Sub total : = Rp 648,866.40
Upah An. SNI ( Revisi ) 6.8.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 1,970.62

Total upah+bahan : = Rp 658,843.02

Memasang 1 M Kabel Power fire alarm ( NYA 3x2x2,5 mm )


Bahan An. SNI ( Revisi ) 6.50.1
1.000 m NYA 3x2x2,5 mm @ Rp. 10,780.80 = Rp 10,780.80
1.000 m Conduit pipa dia. 32 @ Rp. 600,000.00 = Rp 600,000.00
5.000 % Perlengkapan instalasi = Rp 30,539.04
Sub total : = Rp 641,319.84
Upah An. SNI ( Revisi ) 6.8.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 1,947.98

Total upah+bahan : = Rp 651,273.82


Memasang 1 M Kabel Power fire alarm ( NYA 20x1,5 mm )
Bahan An. SNI ( Revisi ) 6.51.1
1.000 m NYA 20x1,5 mm @ Rp. 22,704.00 = Rp 22,704.00
1.000 m Conduit pipa 2 x dia. 32 @ Rp. 20,158.00 = Rp 20,158.00
5.000 % Perlengkapan instalasi = Rp 2,143.10
Sub total : = Rp 45,005.10
Upah An. SNI ( Revisi ) 6.51.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 159.03

Total upah+bahan : = Rp 53,170.13

Memasang 1 M jelly armoured ( kabel telepon )


Bahan An. SNI ( Revisi ) 6.52.1
1.000 m Jelly armoured 10x2x0,6 mm @ Rp. 7,846.40 = Rp 7,846.40
5.000 % Perlengkapan instalasi = Rp 392.32
Sub total : = Rp 8,238.72
Upah An. SNI ( Revisi ) 6.52.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Total upah+bahan : = Rp 43,740.72
Memasang Heat Detector
Bahan An. SNI ( Revisi ) 6.53.1
1.000 bh Heat detector @ Rp. 100,000.00 = Rp 100,000.00
5.000 % Perlengkapan instalasi = Rp 5,000.00
Sub total : = Rp 105,000.00
Upah An. SNI ( Revisi ) 6.53.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 339.02

Total upah+bahan : = Rp 113,345.02

Memasang Smoke Detector


Bahan An. SNI ( Revisi ) 6.54.1
1.000 bh Smoke detector @ Rp. 154,000.00 = Rp 154,000.00
5.000 % Perlengkapan instalasi = Rp 7,700.00
Sub total : = Rp 161,700.00
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 509.12

Total upah+bahan : = Rp 170,215.12


Memasang P-PLN
Bahan An. SNI ( Revisi ) 6.55.1
1.000 bh Box Panel @ Rp. 407,289.60 = Rp 407,289.60
1.000 bh Cu Bar @ Rp. 208,060.00 = Rp 208,060.00
1.000 bh MCCB,3p 300 A @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 30,767.48
Sub total : = Rp 646,117.08
Upah An. SNI ( Revisi ) 6.55.2
0.600 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 48,000.00
0.750 Oh Tukang listrik @ Rp. 100,000.00 = Rp 75,000.00
0.500 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 55,000.00
0.350 Oh Mandor @ Rp. 120,000.00 = Rp 42,000.00
Sub total : = Rp 220,000.00
Lain-lain K3 + CAR = Rp 2,598.35

Total upah+bahan : = Rp 868,715.43

Testing & Commissioning


Bahan An. SNI ( Revisi ) 6.55.1
1.000 ls Testing & Commissioning @ Rp. 1,000,000.00 = Rp 1,000,000.00
5.000 % Perlengkapan instalasi = Rp 50,000.00
Sub total : = Rp 1,050,000.00
Upah An. SNI ( Revisi ) 6.54.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 3,174.02

Total upah+bahan : = Rp 1,061,180.02


ANALISA ELEKTRIKAL
Memasang 1 buah instalasi titik Lampu Sorot
Bahan An. SNI ( Revisi ) 6.1.1
16.000 m Kabel NYY 3x2,5 mm2 @ Rp. 7,840.00 = Rp 125,440.00
16.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 25,600.00
5.000 % Perlengkapan instalasi = Rp 7,552.00
Sub total : = Rp 158,592.00
Upah An. SNI ( Revisi ) 6.1.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00

Lain-lain K3 + CAR = Rp 582.28

Total upah+bahan : = Rp 194,676.28


Memasang 1 m' pipa Gip ø 100 mm
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m pipa Gip ø 100 mm @ Rp. 0.00 = Rp 0.00
5.000 % Perlengkapan instalasi = Rp 0.00
Sub total : = Rp 0.00
Upah An. SNI ( Revisi ) 6.3.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 106.51

Total upah+bahan : = Rp 35,608.51

Memasang Kabel Ladder ( W=200 mm )


Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Tray w=200 mm @ Rp. 89,200.00 = Rp 89,200.00
5.000 % Perlengkapan instalasi = Rp 4,460.00
Sub total : = Rp 93,660.00
Upah An. SNI ( Revisi ) 6.14.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 387.49

Total upah+bahan : = Rp 129,549.49


Memasang Tee Kabel Ladder ( W=200 mm )
Bahan An. SNI ( Revisi ) 6.15.1
1.000 bh TEE w=200 mm @ Rp. 103,600.00 = Rp 103,600.00
5.000 % Perlengkapan instalasi = Rp 5,180.00
Sub total : = Rp 108,780.00
Upah An. SNI ( Revisi ) 6.15.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 432.85

Total upah+bahan : = Rp 144,714.85

Memasang 1 M Kabel Power ( NYY 4x240 mm + NYA 95 mm )


Bahan An. SNI ( Revisi ) 6.13.1
1.000 m NYY 4x240 mm @ Rp. 648,720.00 = Rp 648,720.00
1.000 m NYA 95 mm @ Rp. 61,480.00 = Rp 61,480.00
5.000 % Perlengkapan instalasi = Rp 35,510.00
Sub total : = Rp 745,710.00
Upah An. SNI ( Revisi ) 6.13.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 2,343.64

Total upah+bahan : = Rp 783,555.64


Memasang 1 M Kabel Power ( NYY 3x2,5 mm )
Bahan An. SNI ( Revisi ) 6.8.1
1.000 m NYY 3x2,5 mm @ Rp. 7,840.00 = Rp 7,840.00
1.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 1,600.00
5.000 % Perlengkapan instalasi = Rp 472.00
Sub total : = Rp 9,912.00
Upah An. SNI ( Revisi ) 6.8.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 136.24

Total upah+bahan : = Rp 45,550.24

Memasang Kabel Tray ( W=900 mm )


Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Tray w=900 mm @ Rp. 162,702.80 = Rp 162,702.80
5.000 % Perlengkapan instalasi = Rp 8,135.14
Sub total : = Rp 170,837.94
Upah An. SNI ( Revisi ) 6.14.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 619.02

Total upah+bahan : = Rp 206,958.96


Memasang Kabel Tray ( W=600 mm )
Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Tray w=600 mm @ Rp. 179,040.00 = Rp 179,040.00
5.000 % Perlengkapan instalasi = Rp 8,952.00
Sub total : = Rp 187,992.00
Upah An. SNI ( Revisi ) 6.14.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 670.48

Total upah+bahan : = Rp 224,164.48


Memasang 1 M Kabel Power ( FRC 4x4 mm + NYA 4 mm )
Bahan An. SNI ( Revisi ) 6.10.1
1.000 m FRC 4x4 mm @ Rp. 60,300.00 = Rp 60,300.00
1.000 m NYA 4 mm @ Rp. 2,858.80 = Rp 2,858.80
5.000 % Perlengkapan instalasi = Rp 3,157.94
Sub total : = Rp 66,316.74
Upah An. SNI ( Revisi ) 6.9.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 305.46

Total upah+bahan : = Rp 102,124.20

Memasang 1 M Kabel Power ( FRC 3x2.5 mm )


Bahan An. SNI ( Revisi ) 6.10.1
1.000 m FRC 3x 2.5 mm @ Rp. 33,960.00 = Rp 33,960.00

5.000 % Perlengkapan instalasi = Rp 1,698.00


Sub total : = Rp 35,658.00
Upah An. SNI ( Revisi ) 6.9.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 213.48

Total upah+bahan : = Rp 71,373.48


Memasang 1 M Kabel Power ( NYY 4x25 mm + NYA 16 mm )
Bahan An. SNI ( Revisi ) 6.12.1
1.000 m NYY 4x25 mm @ Rp. 72,080.00 = Rp 72,080.00
1.000 m NYA 16 mm @ Rp. 10,600.00 = Rp 10,600.00
5.000 % Perlengkapan instalasi = Rp 4,134.00
Sub total : = Rp 86,814.00
Upah An. SNI ( Revisi ) 6.12.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 288.51

Total upah+bahan : = Rp 96,458.51

Memasang 1 M Kabel Power ( FRC 4x6 mm + NYA 6 mm )


Bahan An. SNI ( Revisi ) 6.11.1
1.000 m FRC 4x6 mm @ Rp. 80,174.00 = Rp 80,174.00
1.000 m NYA 6 mm @ Rp. 4,279.60 = Rp 4,279.60
5.000 % Perlengkapan instalasi = Rp 4,222.68
Sub total : = Rp 88,676.28
Upah An. SNI ( Revisi ) 6.11.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 372.53

Total upah+bahan : = Rp 124,550.81


Memasang Kabel Tray ( W=600 mm )
Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Tray w=600 mm @ Rp. 179,040.00 = Rp 179,040.00
5.000 % Perlengkapan instalasi = Rp 8,952.00
Sub total : = Rp 187,992.00
Upah An. SNI ( Revisi ) 6.14.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 670.48

Total upah+bahan : = Rp 224,164.48

Memasang Reduser Kabel Tray ( W=400 mm )


Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Reducer w=400 mm @ Rp. 147,827.60 = Rp 147,827.60
5.000 % Perlengkapan instalasi = Rp 7,391.38
Sub total : = Rp 155,218.98
Upah An. SNI ( Revisi ) 6.14.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 572.16

Total upah+bahan : = Rp 191,293.14


Memasang Kabel Tray ( W=400 mm )
Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Tray w=400 mm @ Rp. 155,520.00 = Rp 155,520.00
5.000 % Perlengkapan instalasi = Rp 7,776.00
Sub total : = Rp 163,296.00
Upah An. SNI ( Revisi ) 6.14.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 596.39

Total upah+bahan : = Rp 199,394.39

Memasang Tee Kabel Tray ( W=400 mm )


Bahan An. SNI ( Revisi ) 6.15.1
1.000 bh TEE w=400 mm @ Rp. 145,280.00 = Rp 145,280.00
5.000 % Perlengkapan instalasi = Rp 7,264.00
Sub total : = Rp 152,544.00
Upah An. SNI ( Revisi ) 6.15.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 564.14

Total upah+bahan : = Rp 188,610.14


Memasang Elbow Kabel Tray ( W=400 mm )
Bahan An. SNI ( Revisi ) 6.14.1
1.000 m Elbow w=400 mm @ Rp. 136,540.00 = Rp 136,540.00
5.000 % Perlengkapan instalasi = Rp 6,827.00
Sub total : = Rp 143,367.00
Upah An. SNI ( Revisi ) 6.14.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 536.61

Total upah+bahan : = Rp 179,405.61

Memasang 1 M Kabel Power ( NYFGbY 4x16 mm + NYA 16 mm )


Bahan An. SNI ( Revisi ) 6.12.1
1.000 m NYFGbY 4x16 mm @ Rp. 57,800.00 = Rp 57,800.00
1.000 m NYA 16 mm @ Rp. 10,600.00 = Rp 10,600.00
5.000 % Perlengkapan instalasi = Rp 3,420.00
Sub total : = Rp 71,820.00
Upah An. SNI ( Revisi ) 6.12.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 243.53
Total upah+bahan : = Rp 81,419.53
Memasang 1 M Kabel Power ( NYY 4x185 mm + NYA 95 mm )
Bahan An. SNI ( Revisi ) 6.12.1
1.000 m NYY 4x185 mm @ Rp. 495,680.00 = Rp 495,680.00
1.000 m NYA 95 mm @ Rp. 61,480.00 = Rp 61,480.00
5.000 % Perlengkapan instalasi = Rp 27,858.00
Sub total : = Rp 585,018.00
Upah An. SNI ( Revisi ) 6.12.2
0.033 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,600.00
0.033 Oh Tukang listrik @ Rp. 100,000.00 = Rp 3,250.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 9,356.00
Lain-lain K3 + CAR = Rp 1,783.12

Total upah+bahan : = Rp 596,157.12

Memasang 1 M Kabel Power ( NYM 3x4 mm )


Bahan An. SNI ( Revisi ) 6.8.1
1.000 m NYM 3x4 mm @ Rp. 7,700.00 = Rp 7,700.00
1.000 m Conduit pipa dia. 20 @ Rp. 1,600.00 = Rp 1,600.00
5.000 % Perlengkapan instalasi = Rp 465.00
Sub total : = Rp 9,765.00
Upah An. SNI ( Revisi ) 6.8.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 53.31

Total upah+bahan : = Rp 17,824.31


Memasang Lampu sorot
Bahan An. SNI ( Revisi ) 6.30.1
1.000 bh Lampu armatur HPI-T 250 @ Rp. 1,100,000.00 = Rp 1,100,000.00

5.000 % Perlengkapan instalasi = Rp 55,000.00


Sub total : = Rp 1,155,000.00
Upah An. SNI ( Revisi ) 6.30.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Lain-lain K3 + CAR = Rp 3,571.51
Total upah+bahan : = Rp 1,194,073.51

Memasang Lampu T-Bulk-18 watt + batt


Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Lampu TL Bulk-18W + batt @ Rp. 280,000.00 = Rp 280,000.00
5.000 % Perlengkapan instalasi = Rp 14,000.00
Sub total : = Rp 294,000.00
Upah An. SNI ( Revisi ) 6.33.2
0.120 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 9,600.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 44,600.00
Lain-lain K3 + CAR = Rp 1,015.80

Total upah+bahan : = Rp 339,615.80


Memasang Lampu Baret-32 watt
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Baret-32w @ Rp. 91,000.00 = Rp 91,000.00
5.000 % Perlengkapan instalasi = Rp 4,550.00
Sub total : = Rp 95,550.00
Upah An. SNI ( Revisi ) 6.35.2
0.015 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 1,200.00
0.015 Oh Tukang listrik @ Rp. 100,000.00 = Rp 1,500.00
0.001 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 110.00
0.001 Oh Mandor @ Rp. 120,000.00 = Rp 120.00
Sub total : = Rp 2,930.00
Lain-lain K3 + CAR = Rp 295.44

Total upah+bahan : = Rp 98,775.44

Memasang Panel MDP


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel MDP @ Rp. 13,700,000.00 = Rp 13,700,000.00
5.000 % Perlengkapan instalasi = Rp 685,000.00
Sub total : = Rp 14,385,000.00
Upah An. SNI ( Revisi ) 6.35.2
0.600 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 48,000.00
0.750 Oh Tukang listrik @ Rp. 100,000.00 = Rp 75,000.00
0.500 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 55,000.00
0.350 Oh Mandor @ Rp. 120,000.00 = Rp 42,000.00
Sub total : = Rp 220,000.00
Lain-lain K3 + CAR = Rp 43,815.00

Total upah+bahan : = Rp 14,648,815.00


Memasang Panel DB Pengelola
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel DB Pengelola @ Rp. 4,019,040.00 = Rp 4,019,040.00
5.000 % Perlengkapan instalasi = Rp 200,952.00
Sub total : = Rp 4,219,992.00
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 40,000.00
0.600 Oh Tukang listrik @ Rp. 100,000.00 = Rp 60,000.00
0.400 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 44,000.00
0.250 Oh Mandor @ Rp. 120,000.00 = Rp 30,000.00
Sub total : = Rp 174,000.00
Lain-lain K3 + CAR = Rp 13,181.98

Total upah+bahan : = Rp 4,407,173.98

Memasang Panel DB Unit Lt 1


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PP-Unit Lt.1 @ Rp. 5,000,000.00 = Rp 5,000,000.00
5.000 % Perlengkapan instalasi = Rp 250,000.00
Sub total : = Rp 5,250,000.00
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 40,000.00
0.600 Oh Tukang listrik @ Rp. 100,000.00 = Rp 60,000.00
0.400 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 44,000.00
0.250 Oh Mandor @ Rp. 120,000.00 = Rp 30,000.00
Sub total : = Rp 174,000.00
Lain-lain K3 + CAR = Rp 16,272.00

Total upah+bahan : = Rp 5,440,272.00


Memasang Panel DB Unit Lt 2 & 3
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh PP-Unit Lt.2 & 3 @ Rp. 5,000,000.00 = Rp 5,000,000.00
5.000 % Perlengkapan instalasi = Rp 250,000.00
Sub total : = Rp 5,250,000.00
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 40,000.00
0.600 Oh Tukang listrik @ Rp. 100,000.00 = Rp 60,000.00
0.400 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 44,000.00
0.250 Oh Mandor @ Rp. 120,000.00 = Rp 30,000.00
Sub total : = Rp 174,000.00
Lain-lain K3 + CAR = Rp 16,272.00

Total upah+bahan : = Rp 5,440,272.00

Memasang Panel Kebakaran


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel Kebakaran @ Rp. 6,302,560.00 = Rp 6,302,560.00
5.000 % Perlengkapan instalasi = Rp 315,128.00
Sub total : = Rp 6,617,688.00
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 40,000.00
0.600 Oh Tukang listrik @ Rp. 100,000.00 = Rp 60,000.00
0.400 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 44,000.00
0.250 Oh Mandor @ Rp. 120,000.00 = Rp 30,000.00
Sub total : = Rp 174,000.00
Lain-lain K3 + CAR = Rp 20,375.06

Total upah+bahan : = Rp 6,812,063.06


Memasang Panel Pompa Air Bersih
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel Pompa Air Bersih @ Rp. 4,145,280.00 = Rp 4,145,280.00
5.000 % Perlengkapan instalasi = Rp 207,264.00
Sub total : = Rp 4,352,544.00
Upah An. SNI ( Revisi ) 6.35.2
0.500 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 40,000.00
0.600 Oh Tukang listrik @ Rp. 100,000.00 = Rp 60,000.00
0.400 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 44,000.00
0.250 Oh Mandor @ Rp. 120,000.00 = Rp 30,000.00
Sub total : = Rp 174,000.00
Lain-lain K3 + CAR = Rp 13,579.63

Total upah+bahan : = Rp 4,540,123.63

Memasang Panel Unit


Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Panel Unit @ Rp. 199,920.00 = Rp 199,920.00
5.000 % Perlengkapan instalasi = Rp 9,996.00
Sub total : = Rp 209,916.00
Upah An. SNI ( Revisi ) 6.35.2
0.400 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 32,000.00
0.500 Oh Tukang listrik @ Rp. 100,000.00 = Rp 50,000.00
0.300 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 33,000.00
0.150 Oh Mandor @ Rp. 120,000.00 = Rp 18,000.00
Sub total : = Rp 133,000.00
Lain-lain K3 + CAR = Rp 1,028.75

Total upah+bahan : = Rp 343,944.75


Memasang Lampu LED 7 watt
Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu LED 7 watt @ Rp. 50,000.00 = Rp 50,000.00

5.000 % Perlengkapan instalasi = Rp 2,500.00


Sub total : = Rp 52,500.00
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 4,000.00
0.075 Oh Tukang listrik @ Rp. 100,000.00 = Rp 7,500.00
0.040 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 4,400.00
0.030 Oh Mandor @ Rp. 120,000.00 = Rp 3,600.00
Sub total : = Rp 19,500.00
Lain-lain K3 + CAR = Rp 216.00

Total upah+bahan : = Rp 72,216.00


Memasang Lampu LED 7 watt c/w battery charger
An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu LED 7 watt c/w batte@ Rp. 230,000.00 = Rp 230,000.00

5.000 % Perlengkapan instalasi = Rp 11,500.00


Sub total : = Rp 241,500.00
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 4,000.00
0.075 Oh Tukang listrik @ Rp. 100,000.00 = Rp 7,500.00
0.040 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 4,400.00
0.030 Oh Mandor @ Rp. 120,000.00 = Rp 3,600.00
Sub total : = Rp 19,500.00
Lain-lain K3 + CAR = Rp 783.00

Total upah+bahan : = Rp 261,783.00


Memasang Lampu LED 9 watt
Bahan An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu LED 9 watt @ Rp. 56,000.00 = Rp 56,000.00

5.000 % Perlengkapan instalasi = Rp 2,800.00


Sub total : = Rp 58,800.00
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 4,000.00
0.075 Oh Tukang listrik @ Rp. 100,000.00 = Rp 7,500.00
0.040 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 4,400.00
0.030 Oh Mandor @ Rp. 120,000.00 = Rp 3,600.00
Sub total : = Rp 19,500.00
Lain-lain K3 + CAR = Rp 234.90

Total upah+bahan : = Rp 78,534.90

Memasang Lampu LED 9 watt c/w battery charger


An. SNI ( Revisi ) 6.31.1
1.000 bh Lampu LED 9 watt c/w batte@ Rp. 236,000.00 = Rp 236,000.00

5.000 % Perlengkapan instalasi = Rp 11,800.00


Sub total : = Rp 247,800.00
Upah An. SNI ( Revisi ) 6.31.2
0.050 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 4,000.00
0.075 Oh Tukang listrik @ Rp. 100,000.00 = Rp 7,500.00
0.040 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 4,400.00
0.030 Oh Mandor @ Rp. 120,000.00 = Rp 3,600.00
Sub total : = Rp 19,500.00
Lain-lain K3 + CAR = Rp 801.90

Total upah+bahan : = Rp 268,101.90


JADWAL WAKTU PELAKSANAAN PEKERJAAN / TIME SCHEDULLE

JANGKA WAKTU PELAKSANAAN PEKERJAAN 150 ( SERATUS LIMA PULUH ) HARI KALENDER
BOBOT MINGGU KE
NO URAIAN PEKERJAAN
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 3 Hari
I. PEKERJAAN PERSIAPAN DAN PEKERJAAN RK3K KONSTRUKSI 100%

I.A. PEKERJAAN PERSIAPAN 2.042 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.041

I.B. PEKERJAAN RK3K KONSTRUKSI 0.925 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.019
75%

II. PEKERJAAN STRUKTUR, ARSITEKTUR DAN ME

II.A. PEKERJAAN STANDART

II.A. (1) PEKERJAAN STRUKTUR STANDART 29.806 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 50%

II.A. (2) PEKERJAAN ARSITEKTUR STANDART 33.475 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232

II.A. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR 4.301 0.614 0.614 0.614 0.614 0.614 0.614 0.614

II.B. PEKERJAAN NON STANDART


25%

II.B. (1) PEKERJAAN STRUKTUR NON STANDART 15.128 1.891 1.891 1.891 1.891 1.891 1.891 1.891 1.891

II.B. (2) PEKERJAAN ARSITEKTUR NON STANDART 9.879 1.646 1.646 1.646 1.646 1.646 1.646

II.B. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART 4.443 0.444 0.444 0.444 0.444 0.444 0.444 0.444 0.444 0.444 0.444

BERITA ACARA SERAH TERIMA PEKERJAAN PERTAMA ( P H O ) P H O 0%

RENCANA BOBOT MINGGUAN 100.000 0.138 0.138 2.029 2.029 4.158 4.158 4.499 4.499 4.499 6.390 6.390 6.834 6.834 6.590 6.590 7.204 7.204 7.204 5.075 3.429 3.429 0.674
KOMULATIF RENCANA BOBOT MINGGUAN - 0.138 0.277 2.306 4.336 8.494 12.653 17.152 21.651 26.150 32.540 38.930 45.765 52.599 59.189 65.779 72.984 80.188 87.393 92.468 95.897 99.326 100.000

REALISASI BOBOT MINGGUAN 1.273 2.492


KOMULATIF REALISASI BOBOT MINGGUAN - 1.273 3.765

DEVIASI (terlambat / mendahului) 0.996 1.458


NETWORK PLANNING SYSTEM

NO. URAIAN PEKERJAAN WAKTU

I. PEKERJAAN PERSIAPAN DAN PEKERJAAN RK3K KONSTRUKSI


PEKERJAAN PERSIAPAN 150 Hari
PEKERJAAN RK3K KONSTRUKSI 150 Hari

II. PEKERJAAN STRUKTUR, ARSITEKTUR DAN ME


II.A. PEKERJAAN STANDART
PEKERJAAN STRUKTUR STANDART 98 Hari
PEKERJAAN ARSITEKTUR STANDART 98 Hari
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR 42 Hari

II.B. PEKERJAAN NON STANDART


PEKERJAAN STRUKTUR NON STANDART 56 Hari
PEKERJAAN ARSITEKTUR NON STANDART 42 Hari
PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART 70 Hari

SERAH TERIMA PERTAMA PEKERJAAN ( PHO )

PEKERJAAN RK3K KONSTRUKSI


PEKERJAAN PERSIAPAN

150 Hari

PEKERJAAN STRUKTUR NON STANDART

84 Hari

0 7 112 147
P H O
14 35 77 91
150
A B C D E F G H
147 I
0 7 14 35 77 91 112
150
7 Hari 7 Hari 21 Hari 42 Hari 14 Hari 21 Hari 35 Hari 3 Hari

PEKERJAAN ARSITEKTUR NON STANDART


PEKERJAAN STRUKTUR STANDART

98 Hari

PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR


PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART

70 Hari

0
0

0
0
JADWAL PENUGASAN PERSONIL

JANGKA WAKTU PELAKSANAAN PEKERJAAN 150 ( SERATUS LIMA PULUH ) HARI KALENDER
Jumlah Satuan Pengalaman MINGGU KE
No. Uraian Pekerjaan KET
( Tahun ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 3 Hari
PERSONIL :
1 Pelaksana 1 Orang 2

2 Petugas Keselamatan Konstruksi 1 Orang 0

0
0

0
0
JADWAL PENGIRIMAN BAHAN

JADWAL PELAKSANAAN PEKERJAAN 150 ( SERATUS LIMA PULUH ) HARI KALENDER


MINGGU KE
No. Uraian Pekerjaan KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 3 Hari

BAHAN :
1 Beton readymix K-300
2 Besi beton
3 Kawat beton
4 Kayu Kaso 5/7
5 Multiplek 9 mm
6 Balok
7 Minyak bekisting
8 Paku
9 Tanah urug
10 Pasir urug
11 Semen PC
12 Pasir Beton
13 Batu split
14 Besi Wiremesh M-8
15 Atap Baja Ringan
16 Pipa baja 4, T = 3.2 mm
17 Base plate t= 6mm
18 Mur Baut A325 HTB Dia 12 mm
19 Sika
20 Tiang Pancang 25x25 cm
21 Pasir pasang
22 Bata ringan/Hebel
23 Semen acian mortar
24 Semen plester mortar
25 Gypsumboard 9 mm
26 Rangka holow 4/4
27 Pipa Stainless steel
28 Keramik 20x25
29 Grill besi
30 Plint Homogenous Tile 10x60
31 Keramik 20x20
Granit Homogenous Tile polish Uk. 60x60 cm
Granit Homogenous Tile unpolish Uk. 60x60 cm
32 Kusen Alumunium
33 Selimar Alumunium
34 Daun pintu dan kusen UPVC
35 Kaca 8 mm
36 Kaca 6 mm
37 Aksesories
38 Glassblock 20 x 20
39 Roster 20 x 20
40 Pintu Besi
41 Besi Holow 4/4
42 Gypsum Board 9 mm
43 Hollow 4/4 galvanis
44 GRC Board 6 mm
45 List Plafond 5 cm
46 Step Nozing Uk. 10 x 60 cm
47 Waterproofing Membran Bakar
48 Waterproofing Liquid
49 Closet Jongkok Type Standar
50 Shower + Kran Stainless
51 Kran Stainless
52 Floor Drain Stainless
53 Cat tembok eksterior
54 Cat tembok interior
55 Cat Epoxy 500 micron
56 Logo Signage PU, Baja 3mm uk 80x80
57 Atap Metal Berpasir T=0.35 MM
58 Nok Genteng Metal
59 Lisplang GRC tebal 9 mm lebar 30 cm
60 Tanah Subur
61 Tanaman Rumput Gajah Mini
62 Tanaman Kacang-kacangan
63 Tanaman Rolia Ungu
64 Tanaman Pohon Zodia T= 25-40 cm
65 Tanaman Pohon Mangga diameter 10 - 15 cm Tinggi =2,5 m
66 Tanaman Pohon Kelengkeng diameter 10 - 15 cm Tinggi = 2,5 m
67 Tanaman Pohon Rambutan diameter 10 - 15 cm Tinggi = 2,5 m
68 Tanaman Pohon Tabebuya diamater 10 - 15 cm Tinggi = 3 m
69 Tanaman Pohon Ketapang Kencana diameter 10 - 15 cm Tinggi = 3 Meter
70 Pohon Pucuk Merah Tinggi = 2 meter
71 Pasir urug
72 Paving Blok t = 6 cm (standart)
73 Kanstein uk. 8.40.20
74 Grass Blok t = 6 cm (standart)
75 Bata merah
76 Buis Beton Setengah Lingkaran 30 cm
77 Gorong-Gorong dia. 60 cm
78 Grill penutup saluran, besi siku 50.50.5 + plat strip
79 Lemari Surat
80 Nama Ruangan 10x20 cm -acrylic
81 Nama Lantai 30x30 -acrylic
82 Papan Informasi Denah Bangunan 60x120 cm -acrylic
83 Pipa PVC kelas AW
84 Gate Valve
85 Clean Out (CO)
86 Portable Grease Trap
87 Pipa PVC Kelas D
88 Panel Lt.I
89 KW-meter/1ph/6A
90 Panel Unit
91 NYY 4 x 10 mm2 + E-NYA 6 mm2
92 NYM 3 x 4 mm2
92 Kabel Tray W200 x H100
93 Elbow W200 x H100
94 Lampu LED 9 Watt
95 Lampu LED 9 Watt, c/w battery charger (Selasar)
96 Lampu LED 7 Watt
97 Lampu baret isi TL Bulat-20 watt c/w battery charger
98 Exit Lamp-18 watt c/w battery charger
99 Lampu TL 1 x 36 watt, Balk
100 Stop Kontak 1P, 220 Volt, 10A, Wall Type
101 Saklar 1 Gang
102 Saklar 2 Gang
103 Saklar Hotel 1 Gang
104 Saklar Hotel 2 Gang
105 NYM 3 x 2,5 mm2 + PVC Conduit dia.20
106 Panel Lt.II
107 Panel MDP
108 Panel Pompa Air Berrsih
109 NYY 4 x 10 mm2 + E-NYA 10 mm2
110 NYY 4 x 6 mm2 + E-NYA 6 mm2
111 NYY 4 x 4 mm2 + E-NYA 4 mm2
112 TL 1 x 18 W, TL Balk Type
113 Grounding Rod GIP 1'
114 Termination R.Supporting Material
115 Kabel BC 50 mm2
116 Gate Valve
117 Type Class ABC 3,5 kg DCP Seamless, c/w support
118 Exhaust kap 100 Cfm ( ceiling Mounted )
119 Pipa PVC Class D
120 Grille 200 x 200 (Alumunium)
121 Lift Pump
122 Booster Pump / Distribution Pump
123 Pompa Shalow Well
124 Tangki Air Atas ( Type Cylinder ) kap. 1500 ltr
125 Ground Water Tank 4 m3
126 Gate Valve
127 Check Valve ( CV )
128 Strainer ( STR )
129 Flexible Joint ( FJ )
130 Foot Valve
131 Pressure Gauge
132 Pipa GIP
133 Meteran Air c/w GV dia. 50 & Box Meteran
134 Pasang Baru Daya Listrik PLN 66 KVA (66000 VA)
135 Roof drain

0
0

0
0
JADWAL PENGGUNAAN PERALATAN

JADWAL PELAKSANAAN PEKERJAAN 150 ( SERATUS LIMA PULUH ) HARI KALENDER


MINGGU KE
No. Uraian Kapasitas Jumlah Satuan KET
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 3 Hari
PERALATAN
1 Concrete Mixer 0,5 m3 1 Unit

2 Tamping Rammer 5,5 HP 1 Unit

3 Hydraulic Jack In Pile Piling Pressure 80 Ton 1 Unit

4 Generator Set 55 HP 1 Unit

5 Pick Up 1 Ton 1 Unit

0
0

0
0
FORMULIR REKAPITULASI PERHITUNGAN TKDN
NILAI KONTRAK (Rp)
URAIAN Total %TKDN
LN DN
Rp %KDN
BARANG
1. Material Langsung (Bahan Baku) - 1,051,692,378.93 1,051,692,378.93 100.00 100.00
2. Peralatan (Barang Jadi) - 525,846,189.46 525,846,189.46 100.00 100.00

A. Sub Total Barang - 1,577,538,568.39 1,577,538,568.39 100.00 100.00


JASA
3. Manajemen Proyek dan Perekayasaan - 131,461,547.37 131,461,547.37 100.00 100.00
4. Alat Kerja/Fasilitas Kerja - 131,461,547.37 131,461,547.37 100.00 100.00
5. Konstruksi dan Fabrikasi - 262,923,094.73 262,923,094.73 100.00 100.00
6. Jasa Umum - 525,846,189.46 525,846,189.46 100.00 100.00
B. Sub Total Jasa - 1,051,692,378.93 1,051,692,378.93 100.00 100.00
C. Sub Total (A+B) 2,629,230,947.31 2,629,230,947.31 100.00 100.00

0
0

0
0
BAGIAN PEKERJAAN YANG AKAN DISUBKONTRAKKAN

Persentase dari harga Persentase dari Nama


No. Uraian Pekerjaan Total Mata Pembayaran Harga Penawaran Subkontraktor
( % ) ( % ) (jika diperlukan)
1 2 3 4 5

1 TDK ADA TDK ADA TDK ADA TDK ADA

TOTAL ( % ) -

Catatan :
Leveransir / Pemasok bahan tidak termasuk sebagai Sub-Kontraktor

0
0

0
0
DAFTAR BARANG YANG DI IMPORT

NO NAMA BARANG SPESIFIKASI SATUAN JUMLAH HARGA ( Rp. )

NIHIL NIHIL NIHIL NIHIL NIHIL

TOTAL HARGA

0
0

0
0
VOLUME KOMPONEN STRUKTUR
Pekerjaan : PEMBANGUNAN RUMAH SUSUN PONPES BARAK PANJANG
Jumlah Lantai : 3 LANTAI
Lokasi : KDS-D
Tahun Anggaran : 2019

VOL TIE BEAM total panjang : 64 277.7 m' Lantai urugan pasir,
Kerja m3
TB-1 250 x 450 mm TOTAL
b (m) h (m) ts (m) P (Autocad) 1m3 Tul Lentur Jml D As s Weight Pjg Tot. Pjg Vol. (kg) Vc Ws Begisting 0.05 0.1
0.25 0.45 0 213.7 24.041 Tul / Tumpuan 3 16 201.06 - 1.576 138.85 416.55 656.61 24.041 4839.13 245.755 2.67 5.34
panjang bersih 213.7 3 16 201.06 - 1.576 138.85 416.55 656.61
selimut beton 0.03 Tul / Lapangan 3 16 201.06 - 1.576 138.85 416.55 656.61
PC hook tul sengkang 0.07 3 16 201.06 - 1.576 138.85 416.55 656.61
panjang joint 40 D 7.68 Pengekang 2 10 78.54 - 0.616 213.7 427.4 263.17
total 2897.30

Jml 1 bh Tul Geser


Luas 245.755 m2 Tumpuan 713 13 132.73 150 1.042 1.42 1012.5 1054.92
total 245.755 m2 Lapangan 535 13 132.73 200 1.042 1.42 759.7 791.56
total 1846.48
panj.total = 213.7
galian tanah = 44.877 Bendrat 47.44
pasir urug 10cm = 5.3425 Tot. Vol 4791.21
Waste 1% 47.91
Grand Tot. Vol 4839.13

Rasio besi/vol (kg/m3) 201.28


Rasio beton/luas (m3/m2) 0.10
VOLUME KOMPONEN STRUKTUR
Pekerjaan : PEMBANGUNAN RUMAH SUSUN PONPES BARAK PANJANG
Tipe Prototipe : Err:509
Jumlah Lantai : 3 LANTAI
Lokasi : KDS-D
Tahun Anggaran : 2019

VOL PILE CAP


DIMENSI PILE CAP (mm) Jumlah tebal Jumlah Pondasi
Jumlah Lantai galian urugan pasir,
No Tipe Kedalaman Komponen Urugan dalam Lantai Kerja
Pondasi Kerja tanah m3
b h t
PC Pasir Komponen PC
1 PC-1 1600 1600 850 6 40 40.00 0.05 0.1 1 54.4 5.12 10.24
2 PC-2 1200 1200 850 6 2 2.00 0.05 0.1 1 2.04 0.14 0.29
42.00

TOTAL
1 PC-1 VC TOTAL WS TOTAL WS/VC {KG) BEGISTING
1600 x 1600
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
1.6 1.6 0.85 1.92 atas / arah panjang 11 13.00 132.73 150 1.041 3.215 35.365 36.80 76.8 7781.3152 101.31921 217.6
tebal pelat : 0.1 m atas / arah pendek 11 13.00 132.73 150 1.041 3.215 35.365 36.80
tebal selimut : 0.075 m bawah / arah panj. 11 16.00 201.06 150 1.576 3.215 35.365 55.75
bawah / arah pendek 11 16.00 201.06 150 1.576 3.215 35.365 55.75
Pinggang 2 10.00 78.54 0.616 6.1 12.200 7.51
Bendrat 1.93
Luas BEGISTING 5.44 m2 Tot. Vol 194.53
Waste 0% 0.00
Grand Tot. Vol 194.53
Rasio besi/vol (kg/m3) 101.32
Rasio beton/luas (m3/m2) 0.35

TOTAL
2 PC-2 VC TOTAL WS TOTAL WS/VC (KG) BEGISTING
1200 x 1200
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
1.2 1.2 0.85 1.08 atas / arah panjang 9 13.00 132.73 150 1.041 2.815 25.335 26.36 2.16 279.04486 129.18744 8.16
tebal pelat : 0.1 m atas / arah pendek 9 13.00 132.73 150 1.041 2.815 25.335 26.36
tebal selimut : 0.075 m bawah / arah panj. 9 16.00 201.06 150 1.576 2.815 25.335 39.94
bawah / arah pendek 9 16.00 201.06 150 1.576 2.815 25.335 39.94
Pinggang 2 10.00 78.54 0.616 4.5 9.000 5.54
Bendrat 1.38
Luas 4.08 m2 Tot. Vol 139.52
Waste 0% 0.00
Grand Tot. Vol 139.52
Rasio besi/vol (kg/m3) 129.19
Rasio beton/luas (m3/m2) 0.26
LUAS BANGUNAN
LANTAI Panjang Lebar Bukaan Luas (a) Dari Autocad) satuan KELILING satuan

dalm
LT.DASAR bangunan 587 m2 122.5 M'

luar
LT.DASAR bangunan 163.36 m2 132 M'
LT.2 516.2 m2 108.7 M'
LT.3 516.2 m2 108.7 M'
LT.dak Atap 73.5 m2 100.6 M'

BALKON LT 2 13.5 m2 16.8 M'


BALKON LT 3 9.3 m2 13.8 M'

TOTAL LUAS 1879.06 M2 5,297.00 M2

PASANGAN BATU KALI


LANTAI Panjang Tinggi Tebal Volume
LT.DASAR ( arah X ) 0 0.6 0.25 0 m3
0 0.6 0.25 0 m3
( arah Y ) 0 0.6 0.25 0 m3
0 0.6 0.25 0 m3
TOTAL LUAS 0 m3
VOLUME KOMPONEN STRUKTUR
Pekerjaan :
Tipe Prototipe :
Jumlah Lantai :
Lokasi :
Tahun Anggaran :
VOLUME KOMPONEN STRUKTUR
Pekerjaan :
Tipe Prototipe :
Jumlah Lantai :
Lokasi :
Tahun Anggaran :

Anda mungkin juga menyukai