Soekarno
HPS 21,528,563,000.00
HPS 28,577,898,945.00
II.A. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR 4.301 0.000 0.000 0.000
II.B. (1) PEKERJAAN STRUKTUR NON STANDART 15.128 1.891 1.904 0.013
II.B. (2) PEKERJAAN ARSITEKTUR NON STANDART 9.879 0.000 0.000 0.000
II.B. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART 4.443 0.000 0.000 0.000
JUMLAH 100.000
RENCANA KERJA
RENCANA KERJA (KOMULATIF) 2.31
REALISASI KERJA
REALISASI KERJA (KOMULATIF) 3.76
DEVIASI (+/-) 1.458
REKAPITULASI VOLUME BETON DAN BESI TULANGAN
Pekerjaan : #REF!
Jumlah Lantai : #REF!
Lokasi : KDS-E
Tahun Anggaran : #REF!
KOLOM LT.DSR,
TIPE K1
B 300 mm
H 500 mm
L 5500 mm
n (jml) 8 bh SATUAN TOTAL
Vol. Beton Vol. Baja Vol. Beton Vol. Baja
DIMENSI TUL.LENTUR TUL.GESER (Vc) (Ws) (Vc) (Ws) Rasio
beton/luas Rasio besi/vol Prosentase
n Berat Berat (m3/m2) (kg/m3) Penulangan
b (m) h (m) n Kolom n Lantai H (m) (tulangan) D (mm) 40.D (m) As (mm2) (kg/m') Berat (kg) Lokasi s (mm) n D (mm) As (mm2) (kg/m') P (m) Berat (kg) (m3) (kg) (m3) (kg)
0.3 0.5 8 1 5.5 10 16 0.64 201.06 1.576 96.79 Ujung 100 27 13 132.73 1.041 1.58 44.39 0.806 174.10 6.444 1478.96
tbl lt 0.13
tgg blk 0.40 Tengah 150 16 13 132.73 1.041 1.58 26.31 229.51 2.68%
selimut beton 0.04 774.28305 TULANGAN KE PILECAP
hook tulangan sengkang 0.07 Joint 0 0 0 0.00 0.000 0.00 0.00 T = PILECAP 0.5 0.68
Berat
Lokasi n Ø (mm) As (mm2) (kg/m') P (m) Berat (kg) 10.77
TOTAL
1 P-1 VC TOTAL WS TOTAL WS/VC {KG) BEGISTING
2500 x 2500
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
2.5 2.5 0.6 3.13 atas / arah panjang 17 13.00 132.73 150 1.041 3.615 61.455 63.95 56.25 5965.7279 106.05738 108
tebal pelat : 0.1 m atas / arah pendek 17 13.00 132.73 150 1.041 3.615 61.455 63.95
tebal selimut : 0.075 m bawah / arah panj. 17 16.00 201.06 150 1.576 3.615 61.455 96.87
bawah / arah pendek 17 16.00 201.06 150 1.576 3.615 61.455 96.87
Pinggang 2 10.00 78.54 0.616 5.28 10.560 6.50
Bendrat 3.28
Luas BEGISTING 6 m2 Tot. Vol 331.43
Waste 0% 0.00
Grand Tot. Vol 331.43
Rasio besi/vol (kg/m3) 106.06
Rasio beton/luas (m3/m2) 0.52
TOTAL
2 P-2 VC TOTAL WS TOTAL WS/VC (KG) BEGISTING
2500 x 2500
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
2.5 2.5 0.6 3.13 atas / arah panjang 17 13.00 132.73 150 1.041 3.615 61.455 63.95 6.89 789.01172 311.62966 15.84
tebal pelat : 0.1 m atas / arah pendek 17 13.00 132.73 150 1.041 3.615 61.455 63.95
tebal selimut : 0.075 m bawah / arah panj. 17 16.00 201.06 150 1.576 3.615 61.455 96.87
bawah / arah pendek 17 16.00 201.06 150 1.576 3.615 61.455 96.87
Pinggang 2 10.00 78.54 0.616 5.28 10.560 6.50
Bendrat 3.28
Luas 6 m2 Tot. Vol 331.43 TOTAL ALL
Waste 0% 0.00 7.53 915.16479 121.53583 19.68
Grand Tot. Vol 331.43
Rasio besi/vol (kg/m3) 106.06
Rasio beton/luas (m3/m2) 0.52
TOTAL
- P-2A VC TOTAL WS TOTAL WS/VC (KG) BEGISTING
800 x 800
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
0.8 0.8 0.6 0.32 atas / arah panjang 6 13.00 132.73 150 1.041 1.915 11.490 11.96 0.64 126.15307 197.11417 3.84
tebal pelat : 0.1 m atas / arah pendek 6 13.00 132.73 150 1.041 1.915 11.490 11.96
tebal selimut : 0.075 m bawah / arah panj. 6 16.00 201.06 150 1.576 1.915 11.490 18.11
bawah / arah pendek 6 16.00 201.06 150 1.576 1.915 11.490 18.11
Pinggang 2 10.00 78.54 0.616 1.88 3.760 2.32
Bendrat 0.62
Luas 1.92 m2 Tot. Vol 63.08
Waste 0% 0.00
Grand Tot. Vol 63.08
Rasio besi/vol (kg/m3) 197.11
Rasio beton/luas (m3/m2) 0.17
TOTAL
3 P-3 VC TOTAL WS TOTAL WS/VC {KG) BEGISTING
5100 x 2600
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
5.1 2.6 0.6 6.63 atas / arah panjang 35 13.00 132.73 150 1.041 6.215 217.525 226.36 66.3 7616.0678 114.87282 92.4
tebal pelat : 0.1 m atas / arah pendek 18 13.00 132.73 150 1.041 3.715 66.870 69.59
tebal selimut : 0.075 m bawah / arah panj. 35 16.00 201.06 150 1.576 6.215 217.525 342.89
bawah / arah pendek 18 16.00 201.06 150 1.576 3.715 66.870 105.41
Pinggang 2 10.00 78.54 150 0.616 7.98 15.960 9.83
Bendrat 7.54
Luas BEGISTING 9.24 m2 Tot. Vol 761.61
Waste 0% 0.00
Grand Tot. Vol 761.61
Rasio besi/vol (kg/m3) 114.87
Rasio beton/luas (m3/m2) 0.72
LUAS BANGUNAN
LANTAI Panjang Lebar Bukaan Luas (a) Dari Autocad) satuan KELILING satuan
dalm
LT.DASAR bangunan 587 m2 122.5 M'
luar
LT.DASAR bangunan 163.36 m2 132 M'
LT.2 516.2 m2 108.7 M'
LT.3 516.2 m2 108.7 M'
LT.dak Atap 73.5 m2 100.6 M'
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
1.00 0.15 2248.00 337.20 M3
2.00 0.15 6.00 1.80 M3
-1.00 0.15 1466.00 -219.90 M3
2.00 0.15 28.00 8.40 M3
-1.00 0.15 31.50 -4.73 M3
-1.00 0.15 14.19 -2.13 M3
-2.00 0.15 4.10 -1.23 M3
-2.00 0.15 1.80 -0.54 M3
120.65 M3
#REF! #REF!
804.31 M2
#REF! #REF!
44.00 44.00 Buah
#REF! #REF!
58.00 58.00 Buah
0.00 Buah
#REF! #REF!
#REF! #REF!
1.00 0.07 573.04 40.11 M3
#REF! #REF!
1.00 573.04 573.04 M2
#REF! #REF!
1.00 161.50 161.50 M'
#REF! #REF!
#REF! #REF!
4.00 17.40 0.58 40.23 M2
4.00 44.95 0.58 103.92 M2
2.00 0.00 0.58 0.00 M2
2.00 0.00 0.58 0.00 M2
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
144.15 M2
#REF! #REF!
4.00 17.40 0.31 21.58 M2
4.00 44.95 0.31 55.74 M2
2.00 0.00 0.31 0.00 M2
2.00 0.00 0.31 0.00 M2
114.72 M2
#REF! #REF!
2.00 17.40 0.30 0.13 1.31 M3
1.00 44.95 0.30 0.13 1.69 M3
1.00 0.00 0.30 0.13 0.00 M3
1.00 0.00 0.30 0.13 0.00 M3
2.99 M3
#REF! #REF!
2.00 17.40 0.30 0.58 6.03 M3
1.00 44.95 0.30 0.58 7.79 M3
1.00 0.00 0.30 0.58 0.00 M3
1.00 0.00 0.30 0.58 0.00 M3
13.83 M3
#REF! #REF!
2.00 17.40 34.80 M'
2.00 44.95 89.90 M'
1.00 0.00 0.00 M'
2.00 0.00 0.00 M'
0.00 M'
124.70 M'
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
#REF! #REF!
1.00 50.00 50.00 M'
#REF! #REF!
2.00 2.30 4.60 M'
1.00 8.40 8.40 M'
2.00 1.70 3.40 M'
16.40 M'
#REF! #REF!
#REF! #REF!
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
10.24 M2
#REF! #REF!
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
8.00 1.10 0.15 1.32 M2
16.00 0.25 0.15 0.60 M2
12.16 M2
#REF! #REF!
4.00 0.80 0.80 0.05 0.13 M3
#REF! #REF!
4.00 1.10 1.10 0.80 3.87 M3
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
#REF! #REF! 4.15 3.15 2.74 tebal diding 0.15 t = dak 0.12
HORIZONTAL 1.00 2.85 2.33 1.00 6.64 M2
1.00 2.85 2.33 1.00 6.64 M2
VETIKAL 1.00 4.00 2.33 1.00 9.32 M2
1.00 4.00 2.33 1.00 PINTU 3.63 1.00 3.63 5.69 M2
28.29 M2
#REF! #REF!
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 4.00 2.33 2.00 18.64 M2
1.00 4.00 2.33 2.00 PINTU 3.63 1.00 3.63 11.37 M2
56.58 M2
#REF! #REF!
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 4.00 2.33 2.00 18.64 M2
1.00 4.00 2.33 2.00 PINTU 3.63 1.00 3.63 11.37 M2
56.58 M2
#REF! #REF!
4.00 2.33 9.32 M'
1.00 2.15 1.69 3.84 M'
13.16 M'
#REF! #REF!
Atas 1.00 2.85 4.15 11.83 M2
Belakang 1.00 0.29 4.15 4.44 M2
Balok 3.00 0.17 4.15 12.96 M2
Muka 1.00 0.12 4.15 4.27 M2
33.50 M2
#REF! #REF!
LANTAI 1.00 10.97 10.97 M2
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 4.00 2.33 2.00 18.64 M2
1.00 3.85 2.33 2.00 PINTU 3.63 1.00 3.63 10.67 M2
66.85 M2
#REF! #REF!
Atas 1.00 4.00 6.15 24.60 M2
Belakang 1.00 0.29 6.15 6.44 M2
Balok 3.00 0.17 6.15 18.96 M2
Muka 1.00 0.12 6.15 6.27 M2
56.27 M2
#REF! #REF!
LANTAI 1.00 10.97 10.97 M2
TANGGA 2.00 2.81 5.61 M2
16.58 M2
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
#REF! #REF!
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 3.85 2.33 2.00 17.94 M2
1.00 3.85 2.33 2.00 PINTU 3.63 1.00 3.63 10.67 M2
55.18 M2
#REF! #REF!
DAK 1.00 3.15 6.15 19.37 M2
HORIZONTAL 1.00 2.85 2.33 2.00 13.28 M2
1.00 2.85 2.33 2.00 13.28 M2
VETIKAL 1.00 3.85 2.33 2.00 17.94 M2
1.00 3.85 2.33 2.00 PINTU 3.63 1.00 3.63 10.67 M2
74.55 M2
#REF! #REF!
1.00 1.00 Unit
#REF! #REF!
#REF! #REF!
#REF! #REF!
Lobby 1.00 1.00 Unit
#REF! #REF! Lantai Dasar
Unit Hunian 4.00 4.00 Unit
R. WUDHU 2.00 2.00 Unit
R. Pengelola 1.00 1.00 Unit
R, Mushola 0.00 Unit
Janitor danPantri 0.00 Unit
Toilet Umum Wanita 1.00 1.00 Unit
Toilet Umum Pria 1.00 1.00 Unit
9.00 Unit
Lantai 2
Unit Hunian 4.00 4.00 Unit
R. WUDHU 2.00 2.00 Unit
Toilet Umum Wanita 1.00 1.00 Unit
Toilet Umum Pria 1.00 1.00 Unit
R. WUDHU 2.00 2.00 Unit
Lantai 3
Ruang bersama 0 Unit Hunian 4.00 4.00 Unit
Toilet Umum Wanita 1.00 1.00 Unit
Toilet Umum Pria 1.00 1.00 Unit
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
I DRAINASE LUAR/SEKELILING BANGUNAN
1 Pek. Pasangan 1/2 Bata Saluran
4.00 28.17 0.58 65.13 M2
4.00 16.95 0.58 39.19 M2
2.00 64.74 0.58 74.84 M2
4.00 1.70 0.58 3.93 M2
2.00 8.40 0.58 9.71 M2
192.80 M2
2 Pek. Plesteran 1:3
4.00 28.17 0.31 34.93 M2
4.00 16.95 0.31 21.02 M2
2.00 64.74 0.31 40.14 M2
4.00 1.70 0.31 2.11 M2
2.00 8.40 0.31 5.21 M2
4.00 28.17 0.15 16.90 M2
4.00 16.95 0.15 10.17 M2
2.00 64.74 0.15 19.42 M2
4.00 1.70 0.15 1.02 M2
2.00 8.40 0.15 2.52 M2
153.44 M2
3 Pek. Acian
4.00 28.17 0.31 34.93 M2
4.00 16.95 0.31 21.02 M2
2.00 64.74 0.31 40.14 M2
4.00 1.70 0.31 2.11 M2
2.00 8.40 0.31 5.21 M2
4.00 28.17 0.15 16.90 M2
4.00 16.95 0.15 10.17 M2
2.00 64.74 0.15 19.42 M2
4.00 1.70 0.15 1.02 M2
2.00 8.40 0.15 2.52 M2
153.44 M2
4 Pek. Pasir Urug t = 10 cm
2.00 28.17 0.30 0.13 2.11 M3
2.00 16.95 0.30 0.13 1.27 M3
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
1.00 64.74 0.30 0.13 2.43 M3
2.00 1.70 0.30 0.13 0.13 M3
1.00 8.40 0.30 0.13 0.32 M3
6.25 M3
5 Pek. Galian Tanah Saluran
2.00 28.17 0.30 0.58 9.77 M3
2.00 16.95 0.30 0.58 5.88 M3
1.00 64.74 0.30 0.58 11.23 M3
2.00 1.70 0.30 0.58 0.59 M3
1.00 8.40 0.30 0.58 1.46 M3
28.92 M3
6 Pek. Buis Beton Setengah Lingkaran 30 cm
2.00 28.17 56.34 M'
2.00 16.95 33.90 M'
1.00 64.74 64.74 M'
2.00 1.70 3.40 M'
1.00 8.40 8.40 M'
166.78 M'
7 Pek. Gorong-Gorong dia. 60 cm Menuju Ke Riol Kota
1.00 50.00 50.00 M'
8 Pek. Grill penutup saluran, besi siku 50.50.5 + plat strip
2.00 2.30 4.60 M'
1.00 8.40 8.40 M'
2.00 1.70 3.40 M'
16.40 M'
II BAK KONTROL
BAK KONTROL BK
1 Pek. Pasangan 1/2 Bata Bak Kontrol ( 4 unit BK )
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
10.24 M2
2 Pek. Plester + Aci
8.00 1.10 0.80 7.04 M2
16.00 0.25 0.80 3.20 M2
8.00 1.10 0.15 1.32 M2
16.00 0.25 0.15 0.60 M2
12.16 M2
3 Pek. Pasir Urug t = 5 cm
4.00 0.80 0.80 0.05 0.13 M3
4 Pek. Galian Tanah
4.00 1.10 1.10 0.80 3.87 M3
B.3. PEKERJAAN GROUND TANK DAN R. POMPA DI LUAR BANGUNAN
A GWT
1 Pek. Pasang Rollag Bata Teras
2.00 8.90 0.15 1.00 2.67 M2
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
1.00 7.80 0.15 1.00 1.17 M2
3.84 M2
2 Pek. Pasangan Dinding Bata 1:5
2.00 8.90 0.80 1.00 14.24 M2
1.00 7.80 0.80 1.00 6.24 M2
20.48 M2
3 Pek. Plester Dinding Exterior/Dind. Terluar
2.00 8.90 0.60 2.00 21.36 M2
1.00 7.80 0.60 2.00 9.36 M2
2.00 8.90 0.15 1.00 2.67 M2
1.00 7.80 0.15 1.00 1.17 M2
34.56 M2
4 Pek. Acian Dinding Exterior/Dind. Terluar
2.00 8.90 0.60 2.00 21.36 M2
1.00 7.80 0.60 2.00 9.36 M2
2.00 8.90 0.15 1.00 2.67 M2
1.00 7.80 0.15 1.00 1.17 M2
34.56 M2
5 Pek. Kolom Praktis & Balok Praktis 11/11
4.00 0.80 3.20 M'
6 Pek. Perapihan Dinding Beton Exterior
HORIZONTAL 2.00 8.00 1.74 1.00 27.84 M2
VERTIKAL 4.00 3.00 1.74 1.00 20.88 M2
48.72 M2
7 Pek. Perapihan Daerah Dak Beton
DAK 1.00 53.54 53.54 M2
8 Pek. Waterproofing (coating tahan asam, anti toxid + serat fiber) Lantai dan Dinding
LANTAI 2.00 21.42 42.83 M2
1.00 4.50 4.50 M2
HORIZONTAL 2.00 8.00 2.50 1.00 40.00 M2
2.00 1.95 2.50 1.00 9.75 M2
2.00 6.05 2.50 1.00 30.25 M2
2.00 1.80 2.50 1.00 9.00 M2
VERTIKAL 2.00 3.00 2.50 1.00 15.00 M2
2.00 1.33 2.50 1.00 6.63 M2
2.00 1.68 2.50 1.00 8.38 M2
2.00 2.50 2.50 1.00 12.50 M2
178.83 M2
9 Pek. Waterproofing (liquid/cement base) di Daerah Dak
DAK 1.00 53.54 53.54 M2
10 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar)
LANTAI 2.00 21.42 42.83 M2
1.00 4.50 4.50 M2
47.33 M2
11 Pek. Pasang Keramik Dinding 20x20
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
HORIZONTAL 2.00 8.00 2.50 1.00 40.00 M2
2.00 6.05 2.50 1.00 30.25 M2
2.00 1.95 2.50 1.00 9.75 M2
2.00 1.80 2.50 1.00 9.00 M2
VERTIKAL 2.00 3.00 2.50 1.00 15.00 M2
2.00 1.33 2.50 1.00 6.63 M2
2.00 1.68 2.50 1.00 8.38 M2
2.00 2.50 2.50 1.00 12.50 M2
131.50 M2
12 Pek. Cat Dinding dan Dak Bag. Luar (exterior)
TERAS 2.00 8.90 0.60 2.00 21.36 M2
TERAS 1.00 7.80 0.60 2.00 9.36 M2
TERAS 2.00 8.90 0.15 1.00 2.67 M2
TERAS 1.00 7.80 0.15 1.00 1.17 M2
HORIZONTAL GWT 2.00 8.00 1.74 1.00 27.84 M2
VERTIKAL GWT 2.00 3.00 1.74 1.00 10.44 M2
DAK GWT 1.00 53.54 53.54 M2
126.38 M2
13 Pek. Tangga Dalam 'M' GWT + Cat (model gantung lengkap terpasang)
Tangga Monyet 3.00 3.00 Unit
14 Pek. Tangga Luar 'M' GWT + Cat (model gantung lengkap terpasang)
Tangga Monyet 1.00 1.00 Unit
15 Pek. Penutup Mainhole Baja + Cat (terpasang)
Main Hole 3.00 3.00 Unit
B RUANG POMPA
1 Pek. Galian Tanah
HORIZONTAL PONDASI 2.00 4.15 0.93 0.93 7.23 M3
VERTIKAL PONDASI 2.00 4.30 0.93 0.93 7.49 M3
BADAN R POMPA 1.00 4.15 4.30 1.28 22.84 m3
37.55 M3
2 Pek. Pasir Urug t = 5 cm
HORIZONTAL 2.00 4.15 0.93 0.13 1.03 M3
VERTIKAL 2.00 4.30 0.93 0.13 1.07 M3
2.10 M3
3 Pek. Pondasi Batu Belah, Campuran 1 PC : 4 PP
HORIZONTAL 2.00 4.15 0.67 0.80 4.43 M3
VERTIKAL 2.00 4.30 0.67 0.80 4.59 M3
4 Pek. Urugan Tanah Kembali 9.01 M3
BADAN R POMPA 1.00 4.15 4.30 1.28 22.84 m3
3.60 M3
3 Pek. Sloof
Besi U-39 1.00 16.90 8.98 151.73 kg
Bekisting 1.00 16.90 0.26 0.40 13.52 m2
Beton K-300 1.00 16.90 0.26 0.40 1.76 m3
PENGURANG
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
4 Pek. Kolom
Besi U-39 4.00 13.19 52.77 kg
Bekisting 4.00 0.15 0.15 2.50 6.00 m2
Beton K-300 4.00 0.15 0.15 2.50 0.22 m3
5 Pek. Ringbalk
Besi U-39 1.00 16.90 6.88 116.30 kg
Bekisting 1.00 16.90 0.15 0.17 5.75 m2
Beton K-300 1.00 16.90 0.15 0.17 0.43 m3
6 Pek. Dak Atap
Besi U-24 1.00 523.89 523.89 kg
Bekisting 1.00 4.30 6.16 0.12 26.49 m2
Beton K-300 1.00 4.30 6.16 0.12 3.18 m3
7 Pek. Lantai Beton
Besi U-24 (1 lapis) 1.00 221.09 221.09 kg
Beton K-300 1.00 4.15 4.30 0.12 2.14 m3
A
NY
VOLUME
NO. JENIS PEKERJAAN JUMLAH PANJANG LEBAR TINGGI TEBAL BERAT KELILING LUAS VOLUME TIPE KUSEN LUAS KUSEN JMH KUSEN LUAS KUSEN SATUAN
AK
PEKERJAAN
NY
(m2) (m) (m2)
BA
1.00 4.00 2.50 2.00 PINTU 2.31 1.00 2.31 15.38 M2
91.38 M2
14 Pek. Waterproofing (liquid/cement base) di Daerah Dak
DAK 1.00 4.30 6.16 26.49 M2
15 Pek. Pasang Lantai Keramik 20x20 ad.5 cm (kasar)
LANTAI 1.00 16.00 16.00 M2
TANGGA 2.00 1.65 3.30 M2
19.30 M2
16 Pek. Pasang Keramik Dinding 20x20
HORIZONTAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 10.00 M2
VETIKAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 PINTU 2.31 1.00 2.31 7.69 M2
37.69 M2
17 Pek. Cat Dinding dan Dak Bag. Luar (exterior)
DAK 1.00 4.30 6.16 26.49 M2
HORIZONTAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 10.00 M2
VETIKAL 1.00 4.00 2.50 1.00 10.00 M2
1.00 4.00 2.50 1.00 PINTU 2.31 1.00 2.31 7.69 M2
64.18 M2
18 Pek. Pintu Besi
1.00 1.00 Unit
REKAPITULASI
BILL OF QUANTITY ( BOQ )
JERLY HUTAGALUNG
Direktur
R E K A P I T U L A S I
BILL OF QUANTITY ( BOQ )
JERLY HUTAGALUNG
Direktur
R E K A P I T U L A S I
BILL OF QUANTITY ( BOQ )
3. PEKERJAAN ARSITEKTUR
JUMLAH HARGA
NO. U R A I A N P E K E R J A A N
(Rp.)
JERLY HUTAGALUNG
Direktur
REKAPITULASI
BILL OF QUANTITY ( BOQ )
PEKERJAAN MEKANIKAL & ELEKTRIKAL
JERLY HUTAGALUNG
Direktur
LAPORAN MINGGUAN PRESTASI PEKERJAAN
5 P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) 1.00 Ls 500,000.00 0.019 -
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll) 1.00 Ls 500,000.00 0.019 -
8 Pekerjaan Rollag Bata, Pas, 1bt (dibawah dinding bata) 64.55 m2 14,215,556.02 0.541 -
9 Pekerjaan Rollag Bata (disisi luar) 58.00 m2 12,773,079.00 0.486 -
10 Besi Dowel 10-1000 79.49 kg 1,044,817.35 0.040 -
6 Sloof s1
Beton K-300 0.51 m3 514,661.40 0.020 -
Besi beton 61.20 kg 804,413.41 0.031 -
Bekisting 6.80 m2 767,423.07 0.029 -
8 Kolom K1
Beton K-300 0.27 m3 272,467.80 0.010 -
Besi beton 32.40 kg 425,865.92 0.016 -
Bekisting 3.60 m2 316,991.40 0.012 -
3 Pekerjaan Kolom 15 cm x 15 cm
Beton K-300 0.36 M3 363,290.40 0.014 -
Besi beton 43.20 Kg 562,032.00 0.021 -
Bekisting 4.80 M2 422,655.20 0.016 -
2 Kolom K2 ( 30 cm x 30 cm)
Beton K-300 5.17 m3 5,217,253.80 0.198 -
Besi beton 1,443.26 kg 18,776,812.60 0.714 -
Bekisting 68.88 m2 6,065,102.12 0.231 -
2 Kolom K2
Beton K-300 4.28 M3 4,319,119.20 0.164 -
Besi beton 1,224.51 Kg 15,930,875.10 0.606 -
Bekisting 57.12 M2 5,029,596.88 0.191 -
3 Kolom K3
Beton K-300 0.41 M3 413,747.40 0.016 -
Besi beton 136.36 Kg 1,774,043.60 0.067 -
Bekisting 6.80 M2 598,761.53 0.023 -
4 Balok B1.1
Beton K-300 10.33 M3 10,424,416.20 0.396 -
Besi beton 2,897.75 Kg 37,699,727.50 1.434 -
Bekisting 148.46 M2 22,254,252.97 0.846 -
5 Balok B.A.1
Beton K-300 1.60 M3 1,614,624.00 0.061 -
Besi beton 475.21 Kg 6,182,482.10 0.235 -
Bekisting 29.60 M2 4,437,059.73 0.169 -
6 Balok B.3
Beton K-300 0.08 M3 80,731.20 0.003 -
Besi beton 31.06 Kg 404,090.60 0.015 -
Bekisting 1.12 M2 167,888.75 0.006 -
2 Kolom K2
Beton K-300 0.39 M3 393,564.60 0.015 -
Besi beton 118.68 Kg 1,544,026.80 0.059 -
Bekisting 5.14 M2 452,593.28 0.017 -
3 Kolom K3
Beton K-300 2.31 M3 2,331,113.40 0.089 -
Besi beton 831.96 Kg 10,823,799.60 0.412 -
Bekisting 38.52 M2 3,391,807.98 0.129 -
4 Balok B1.2
Beton K-300 6.39 M3 6,448,404.60 0.245 -
Besi beton 2,172.35 Kg 28,262,273.50 1.075 -
Bekisting 97.98 M2 14,687,267.32 0.559 -
5 Balok BA.2
Beton K-300 0.86 M3 867,860.40 0.033 -
Besi beton 176.00 Kg 2,289,760.00 0.087 -
Bekisting 10.80 M2 1,618,927.20 0.062 -
6 B.3
Beton K-300 0.08 M3 80,731.20 0.003 -
Besi beton 31.06 Kg 404,090.60 0.015 -
Bekisting 1.12 M2 167,888.75 0.006 -
9 Beton Tanggulan
Beton K-300 0.42 M3 423,838.80 0.016 -
Besi beton 22.31 Kg 290,253.10 0.011 -
Bekisting 5.67 M2 469,375.83 0.018 -
2 Balok B.3
Beton K-300 0.08 M3 80,731.20 0.003 -
Besi beton 31.06 Kg 404,090.60 0.015 -
Bekisting 1.12 M2 167,888.75 0.006 -
2 Kolom K2 (sopi-sopi)
Beton K-300 0.23 M3 232,102.20 0.009 -
Besi beton 81.18 Kg 1,056,151.80 0.040 -
Bekisting 3.12 M2 274,725.88 0.010 -
A.2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING 97,311,837.02 3.70 -
Kusen Alumunium Powder Coating+ Daun Rk Alumunium + Kaca Clear 8mm + Door Stoper + Jendela 1.00 Unit 8,395,034.40
kaca clear 6mm + Sandblast + Jaring Nyamuk (lengkap terpasang) type PJ-1 0.319 -
Kusen Alumunium Powder Coating + Daun Rk Alumunium + Kaca Clear 8mm + Sandblast + door stoper 2.00 Unit 6,149,826.31
0.234 -
+ Jalusi Alumunium + Jaring Nyamuk (lengkap terpasang) type P-1
Kusen Alumunium Powder Coating + Daun Pintu Engineering Honeycomb Wood + Jalusi Alumunium + 2.00 Unit 5,391,600.05
0.205 -
Jaring Nyamuk (lengkap terpasang) type P-2
Kusen Alumunium Powder Coating, Rangka Daun Pintu Alumunium + Louvre Alumunium (lengkap 8.00 Unit 18,090,815.07
0.688 -
terpasang) type PT
Kusen Alumunium Powder Coating, Rangka Daun Pintu Alumunium + Louvre Alumunium (lengkap 1.00 Unit 2,261,351.88
0.086 -
terpasang) type PTD
Kusen Alumunium Powder Coating + Daun Pintu Alumunium (lengkap terpasang) type PS 2.00 Unit 4,093,309.65 0.156 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J1 4.00 Unit 15,924,403.39 0.606 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J2 4.00 Unit 8,522,210.66 0.324 -
Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 22.00 Unit 11,097,345.60 0.422 -
Pasang Ornamen Type OW 3.56 Unit 4,401,940.00 0.167 -
Pasang Ornamen, Type JOW 6.00 Unit 12,984,000.00 0.494 -
A.7. PEKERJAAN RAMP DI ENTRANCE TERAS, ASESORIS DI FACADE DAN SELASAR KELILING 12,586,093.39 0.48 -
BANGUNAN
Pek. Pasang Hand Railling Ramp Pipa Besi Stailess steel dia 3/4 20.29 M1 3,171,851.17 0.121 -
Pek. Pasang Hand Railling Ramp Pipa Besi Stainless Steel dia 1 9.50 M1 1,485,095.42 0.056 -
Pek. Pasang Hand Railling Ramp Pipa Besi Stainless Steel dia 2 10.81 M1 1,689,882.26 0.064 -
Pasang Beton Ramp 0.53 M3 636,352.03 0.024 -
Pasang Homogenous Tile unpolish lantai Ramp Uk. 60x60 8.76 M2 1,997,821.08 0.076 -
Pasangan rollag bata tangga entrance depan & samping + Ramp 16.37 M2 3,605,091.44 0.137 -
B.2. PEKERJAAN Kusen PINTU / JENDELA + ASSESORIES & RAILING 98,666,118.00 3.75 -
Kusen Alumunium Powder Coating+ Daun Rk Alumunium + Kaca Clear 8mm + Door Stoper + Jendela 1.00 Unit 8,395,034.40
0.319 -
kaca clear 6mm + Sandblast + Jaring Nyamuk (lengkap terpasang) type PJ-1
Kusen Alumunium Powder Coating + Daun Pintu Engineering Honeycomb Wood + Jalusi Alumunium + 2.00 Unit 5,391,600.05
0.205 -
Jaring Nyamuk (lengkap terpasang) type P-2
Kusen Alumunium Powder Coating, Rangka Daun Pintu Alumunium + Louvre Alumunium (lengkap 10.00 Unit 22,613,518.84
0.860 -
terpasang) type PT
Kusen Alumunium Powder Coating + Daun Pintu Alumunium (lengkap terpasang) type PS 2.00 Unit 4,093,309.65 0.156 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J1 4.00 Unit 15,924,403.39 0.606 -
Kusen Alumunium Powder Coating + Daun jendela Rk Alumunium (lengkap terpasang) type J2 4.00 Unit 8,522,210.66 0.324 -
Glassblock 20 x 20 + Beton cetak (terpasang lengkap dengan aksesoris), Type GR1 20.00 Unit 10,088,496.00 0.384 -
Pasang Ornamen Type OW 6.73 m2 8,321,645.00 0.317 -
Pasang Ornamen, Type JOW 6.00 Unit 12,984,000.00 0.494 -
Railing Balkon type R1 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & 2.00 Unit 1,131,800.00
0.043 -
asesoris & terpasang
Railing Balkon type R2 , hollow 40.40 & 20.40 tebal 1,2mm termasuk zincromate finish duco & 1.00 Unit 1,200,100.00
0.046 -
asesoris & terpasang
C.2. PEKERJAAN KUSEN PINTU / JENDELA + ASSESORIES & RAILING 20,931,538.61 0.80 -
Pintu besi Lengkap terpasang Type PD 2.00 Unit 7,840,200.00 0.298 -
Pasang Glass Block Type GB-1 8.00 Unit 7,401,856.00 0.282 -
Pasang Ornamen Type OW 2.88 M2 3,561,120.00 0.135 -
Pas. Logo PU Plat Baja 80 x 80 t=3mm finish cat duco warna doff terpasang 1.00 Unit 2,128,362.61 0.081 -
b LANTAI 2
Fire Extinguisher Type Class ABC 3,5 kg DCP Seamless, c/w support 3.00 bh 612,150.96 0.023 -
b LANTAI 2
Exhaust kap 200 Cfm ( ceiling Mounted ) 2.00 unit 1,805,400.00 0.069 -
Kipas Angin Baling 4.00 unit 2,000,000.00 0.076 -
Pipa PVC Class D diameter 100 18.80 m 1,263,719.55 0.048 -
Grille 200 x 200 (Alumunium) 10.00 bh 1,429,275.00 0.054 -
b Pengadaan dan pemasangan pompa shallow well, kapasitas (debit air) 150 s/d 200 Lpm, pengadaan
c dan pemasangan
Instalasi pipa konstruksi
kabel Kontrol 1 unit
WLC 1 unit
d Instalasi Pipa GIP dia 50 mm ke GWT 1 unit
e Gate Valve dia 2 1 unit
f Bak Kontrol Valve uk, 600 x 600 mm dengan tutup bordes tebal 2 mm 1 unit
g Panel kontrol shallow well type outdoor 1 unit
h Pengujian kwalitas air ke laboratorium 1 unit
i Testing Comissioning & Training 1 unit
j Material & Alat Bantu 1 unit
8 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PPR PN-10 (Incl. Fitting & All Accessories)
SITE PLAN
1. Dari Box Meter PDAM ke GWT
PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) 6.00 m 290,526.75 0.011 -
2. Pemipaan R.Pompa ke Tanki Air Atas
GIP dia. 50 64.60 m 6,016,881.27 0.229 -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1.904
0.038 0.038 1,000,000.00 0.323
0.20 0.038 0.20 0.038 1,000,000.00 20.000
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
-
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - -
-
- - - -
-
- - - -
-
- - - -
-
- - - -
-
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - -
-
- - - -
-
- - - -
-
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
-
- - - -
-
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
-
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
-
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - -
- - - - -
- - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - -
- - - - -
- - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
-
- - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - -
- - - - -
- - - -
- - - - -
- - - - -
- - - - -
- - - - -
2.492 3.765
2.492 3.765
2.029
2.306
2.492
3.765
1.458
DAFTAR HARGA SATUAN PEKERJAAN
PEKERJAAN LANTAI
1 Pek. Pasang Homogenous Tile polish Uk. 60x60 cm M2 206,672.87
2 Pek. Pasang Keramik lantai Uk. 30x30 cm Unpolish M2 166,341.91
3 Pek. Pasang Homogenous Tile unpolish lantai keliling bangunan Uk. 60x60 cm M2 228,061.77
4 Pek. Pasang Homogenous Tile Step Nozing Tangga Uk. 10 x 60 cm M' 46,156.44
5 Pek. Waterproofing (liquid/cement base) M2 87,374.32
6 Pek. Screed + Aci Lantai Dak Torn M2 95,346.63
PEKERJAAN PLAFOND
1 Pek. Penutup Plafond Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm M2 150,305.41
2 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 150,898.00
3 Pek. List Plafond Gypsum 5/5 M' 17,985.00
4 Pek. Beton Expose M2 63,768.45
5 Pek. Penutup Plafond GRC T=6 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 M2 150,898.00
6 Pek. Penutup Plafond Drop Ceiling Gypsum T=9 mm + Rangka Hollow Galvanis Uk. Rangka 60x60 cm 270,390.41
M2
PEKERJAAN UTILITAS
1 Pasang Closet Duduk Type Standar Dual Flush - Unit Hunian (lengkap terpasang) Buah 1,599,730.00
2 Pasang Closet Jongkok Type Standar - Toilet Umum (lengkap terpasang) Buah 296,395.00
3 Pasang Urinoir - Toilet Umum (lengkap terpasang) Buah 760,210.00
4 Pasang Partisi Urinoir - Toilet Umum (lengkap terpasang) Buah 1,196,305.00
5 Pasang Cermin - Toilet Umum (lengkap terpasang) Buah 440,000.00
6 Pasang Wastafel Meja + Kran Stainless + Aksesoris - Toilet Umum (lengkap terpasang) Buah 1,005,675.00
7 Pasang Wastafel Dinding + Kran Stainless + Aksesoris - Unit Hunian (lengkap terpasang) Buah 631,675.00
NO. J E N I S P E K E R J A A N SATUAN HARGA SATUAN (Rp.)
8 Pasang Shower + Kran Stainless - Unit Hunian (lengkap terpasang) Buah 552,244.00
9 Pasang Kran Stainless - Unit Hunian, Toilet Umum, dan Janitor (lengkap terpasang) Buah 72,732.00
10 Pasang Jet Washer + Kran Stainless - Unit Hunian (lengkap terpasang) Buah 162,932.00
11 Pasangan Floor Drain Stainless, di Toilet Hunian, di Toilet Umum, di Ruang Cuci, di Janitor, dan di Tempat Sampah Buah 188,232.00
12 Kitchen Sink + Kran Leher Angsa Stainless - Unit Hunian (lengkap terpasang) Buah 629,156.00
13 Pasangan Floor Drain Stainless - di Dak Torn (lengkap terpasang) Buah 188,232.00
14 Pasang Kran Shower Buah 325,700.00
PEKERJAAN FINISHING
PEKERJAAN PENGECATAN
1 Pek. Cat Dinding Dag. Luar Termasuk Kolom (exterior) M2 36,389.10
2 Pek. Cat Dinding Bag. Dalam Termasuk Kolom (interior) M2 19,686.70
3 Pek. Cat Canopy M2 36,389.10
4 Pek. Cat Plafond M2 19,686.70
5 Pek. Cat List Plafond M1 1,968.67
6 Pek. Cat Epoxy 500 micron Lantai Dak M2 91,144.90
PEKERJAAN STRUKTUR
1 Pek. Beton K-300 (terpasang) M3 1,009,140.00
2 Pek. Besi Beton (terpasang) Kg 13,144.01
3 Pek 1 kg jaring kawat baja (wiremesh) Kg 13,010.00
4 Pek. Pondasi Tiang Pancang 25x25 cm M' 199,000.00
5 Pek. Urugan Tanah (didatangkan) + Pemadatan Tanah Urugan CBR 6% M3 202,664.00
6 Pek. Pasir urug diatas tanah urug t=10 cm (dalam bangunan) M3 241,164.00
7 Pek. Cor beton lantai kerja t=5 cm (dalam bangunan) M3 740,151.50
8 Pek.Besi Weremesh M-8 Kg 13,010.00
9 Pek. Bekisting Tangga M2 82,782.33
10 Pek. Bekisting Balok M2 149,900.67
11 Pek. Bekisting Plat Lantai M2 82,782.33
12 Pek. Bekisting Kolom M2 88,053.17
13 Bekisting Dinding M2 88,383.17
14 Pek. Atap Baja Ringan M2 157,674.00
15 Pek. Bekisting Pondasi/Pile Cap M' 112,856.33
16 Pek. Rollag Bata (diatas tie beam), 1 bt M2 220,225.50
17 Pek. Besi Dowel Ø 10-1000 Kg 13,144.01
18 Pek. Galian tanah M3 56,975.60
19 Pek. Urugan tanah kembali bekas galian M3 33,396.00
20 Pek. Urugan Pasir tebal 10 cm : M3 241,164.00
21 Pek. Lantai Kerja tebal 5 cm M3 740,151.50
22 Pek. Pasangan Batu kali M3 773,272.50
23 Pek. Test PDA Tiang ttk 10,000,000.00
24 Pek.pengeboran tanah D 60 cm M' 257,730.00
25 Pek. pengeboran tanah D 80 cm M' 344,630.00
26 Pek. pengeboran tanah D 100 cm M' 576,950.00
27 Pasang pipa 2,5"Baja 1kg kg 35,953.04
28 Pasang pipa 3 "Baja 1kg kg 38,698.91
29 Pasang pipa 4 "Baja 1kg kg 32,359.80
30 Pasang Baja Profil 1kg kg 32,359.80
NO. J E N I S P E K E R J A A N SATUAN HARGA SATUAN (Rp.)
JERLY HUTAGALUNG
Direktur
DAFTAR HARGA SATUAN DASAR TENAGA KERJA, BAHAN DAN PERALATAN
###
HARGA UPAH
1 Mandor org/hr 120,000.00
2 Kepala tukang org/hr 110,000.00
3 Tukang gali org/hr 100,000.00
4 Tukang batu org/hr 100,000.00
5 Tukang kayu org/hr 100,000.00
6 Tukang besi org/hr 100,000.00
7 Tukang cat org/hr 100,000.00
8 Tukang listrik org/hr 100,000.00
9 Tukang pipa org/hr 100,000.00
10 Pembantu/pekerja org/hr 80,000.00
11 Pembantu operator org/hr 100,000.00
12 Juru ukur org/hr 100,000.00
13 Pembantu juru ukur org/hr 80,000.00
14 Operator org/hr 120,000.00
BAHAN KAYU
1 Kayu meranti balok 6/15 m3 1,000,000.00
2 Kayu meranti papan 3/20 m3 1,000,000.00
3 Kayu meranti usuk 5/7 m3 1,000,000.00
4 Kayu papan begesting 2/20 m3 1,000,000.00
5 Kayu kaso 5/7 pjg 3 m bekisting m3 1,000,000.00
6 Bambu bangkotan btg 14,000.00
7 Dolken kayu galam dia.10 cm, pjg 3 m btg 10,000.00
8 Kayu bakar m3 125,000.00
9 Playwood tebal 4 mm (1.2x2.4) lbr 55,000.00
10 Playwood tebal 9 mm (1.2x2.4) lbr 125,000.00
11 Triplek 4 mm (1.2x2.4) lbr 55,000.00
12 Multipleks 18 mm lbr 200,000.00
BAHAN BATU
1 Batu belah 15-20 m3 180,000.00
2 Batu pecah 5-7 cm m3 160,000.00
3 Batu pecah 3-5 cm m3 160,000.00
4 Batu pecah 2-3 cm m3 160,000.00
5 Batu pecah 1-2 cm m3 160,000.00
6 Batu kerikil beton 2-3 m3 160,000.00
7 Batu kerikil beton (BD Kerikil = 1.350 Kg/m3) Kg 148.14
8 Paving stone / Blok 8 cm m2 84,000.00
9 Paving Stone abu-abu 6 cm m2 68,000.00
10 Kansten 40x20x8 cm bh 24,000.00
11 Grass Block m2 68,000.00
12 Buis beton U 20 bh 28,000.00
13 Buis beton D 30 cm m' 32,000.00
14 Gorong-gorong D 60 cm m' 92,000.00
15 Agregat kasar m3 144,000.00
16 Agregat halus m3 160,000.00
BAHAN DINDING
1 Bata ringan uk. 60 x 20 x 10 cm bh 7,200.00
2 Bata ringan uk. 60 x 20 x 7,5 cm bh 6,000.00
3 Batu bata 5x11x22 cm bh 600.00
4 Batako 20x40x9 cm (press) m2 38,500.00
5 Kerawang press (roster) 18x18 cm bh 6,900.00
6 Kerawang (roster) 20x20 cm, beton bh 9,900.00
7 Batako kuning (putih/tras) bh 1,500.00
NO DAFTAR HARGA BAHAN SATUAN Harga
###
READY MIX
1 Beton K250 ready mix m3 840,000.00
2 Beton K300 ready mix m3 870,000.00
3 Beton K350 ready mix m3 900,000.00
4 Tiang Pancang Beton Uk. 25 x 25 cm L = 12 M K.450 m' 116,000.00
5 Tiang Pancang Beton Uk. 30 x 30 cm L = 12 M K.450 m' 226,400.00
6 Air m3 25,000.00
BAHAN SEMEN
1 Mortar siap pakai utk spesi pasangan bata kg 1,400.00
2 Semen mortar siap pakai utk acian (instan) kg 1,800.00
3 Semen kg 1,175.00
4 Semen 50 kg Zak 58,750.00
5 Semen warna kg 10,000.00
###
36 Karet kaca m 3,000.00
37 Manhole Baja Tebal 3mm, 60 x 60 Bh 550,000.00
38 Pintu besi baja m2 1,650,000.00
39 Perancah/stager m2 300,000.00
40 Penyangga jarak bekisting/spacer bh 5,000.00
41 metal uring plafond btg 38,000.00
42 Plat Track m' 12,000.00
43 Plat Stud m' 13,200.00
44 Besi GIP 3 INCI, 4 mm m' 161,666.66
45 Besi GIP 2 INCI, 3,6 mm m' 65,000.00
46 Besi GIP 1 INCI, 3,6 mm m' 50,000.00
47 Besi GIP 3/4 INCI, 3,6 mm m' 31,666.66
48 Besi Hollow 150x150 mm m' 500,000.00
BAHAN CAT
1 Cat besi/kayu setara Glotex kg 41,600.00
2 Cat meni (besi / kayu) cat pedang kg 22,000.00
3 Thinner A ltr 16,800.00
4 Thinner B ltr 20,000.00
5 Cat tembok Interior, warna Stand kg 18,400.00
6 Cat dasar interior kg 16,800.00
7 Cat tembok Exterior kg 76,800.00
8 Cat dasar exterior kg 19,040.00
9 Cat alkali (undercoat) kg 24,400.00
10 Minyak cat / Afdunner ltr 14,400.00
11 Minyak pelumas ltr 30,000.00
12 Teer ltr 3,000.00
13 Plamur Tembok Set. MATEX Kg 24,800.00
14 Plamir Kayu / Besi Kg 24,800.00
15 Lem kayu kg 23,848.00
16 Lem PVC bh 12,000.00
17 Minyak cat / thinner ltr 14,400.00
18 Dempul kg 28,640.00
19 Ampelas lbr 3,600.00
20 Kuas 2inc bh 12,800.00
21 Cat epoxy kg 56,000.00
KERAMIK
1 Keramik Dinding 20x25 polish buah 2,160.00
2 Keramik Lantai 20x20 un polish buah 1,792.00
3 Keramik Lantai 30x30 polos buah 4,145.45
4 Keramik Lantai 30x30 Unpolish buah 4,666.66
5 Keramik 30 x 60 buah 14,666.66
6 HT Lantai 60x60 polish buah 42,666.66
7 HT Lantai 60x60 unpolish buah 49,333.33
8 HT Lantai 40x40 unpolish buah 24,666.66
9 HT step nosing 10x60 unpolish cutting buah 15,200.00
10 Plint HT 10x60 polish cutting buah 12,800.00
11 Keramik Lantai 30x30 Tactile (pemandu tunanetra) buah 14,400.00
NO DAFTAR HARGA BAHAN SATUAN Harga
###
PENUTUP ATAP
1 Atap genteng metal Spandek berpasir T=0.35 MM m' 93,500.00
2 Nok Metal roof ( L = 120 cm ) bh 20,000.00
3 Genteng bh 3,040.00
4 Atap genteng metal berpasir 0,35mm lbr 128,000.00
5 Asbes gelombang besar m2 29,600.00
6 Seng Gelombang BJLS 0,25 mm x 80 cm x 180 cm m2 28,333.33
7 Spandek 0,3 mm ukr 1 x 6 m m 220,000.00
8 Seng Plat BJLS 30 l=60 Cm Lmbr 26,400.00
9 List plank GRC 2,4 x 0,2 m, t = 9 mm m' 16,000.00
10 Roof Bottom/Reng R 33-0.45 m1 4,933.33
11 Baja ringan C 75.75 m1 14,000.00
12 Alumunium foil 2sisi m2 6,000.00
13 Profil Reng baja ringan m1 6,000.00
14 Dinabolt bh 1,600.00
15 Atap Transparant m1 223,728.81
16 Nok UPVC m1 103,120.00
17 Self drilling screw dia 6 x 20 mm (truss Screw) buah 320.00
18 Pasang ijuk untk resapan kg 896.00
18 Insulasi Powder m2 6,000.00
PLAFOND ###
1 Gypsum Board uk. 1,2 x 2,4 t : 9 mm lbr 58,520.00
2 Kalsiboard 120 x 240, tebal 6 mm lbr 108,000.00
3 GRC board 120 x 240, tebal 4 mm lbr 60,000.00
4 PVC m2 150,000.00
5 List gypsum 5 cm m 6,000.00
6 List Kayu Profil 5 cm m 3,600.00
7 Joint tape rol 30,800.00
8 Kompon zak 72,000.00
9 Sekrup kalsiboard bh 32.80
10 Paku sekrup kg 11,200.00
11 Rockwall m2 24,444.44
###
21 Louvre aluminium (krepyak) m' 56,000.00
22 Level handle pintu baja psg 144,000.00
23 HD non panic swing bh 428,000.00
24 Door Closer bh 16,000.00
25 D. cylinder bh 100,000.00
26 Engsel/hinges pintu besi psg 73,600.00
27 Kunci lemari bh 4,000.00
28 Pasang Roof drain bh 168,000.00
BAHAN KACA
Kaca Bening 3 mm m2 68,000.00
1 Kaca Bening 5 mm m2 76,000.00
2 Kaca Bening 8 mm m2 123,200.00
2 Glass Block bh 36,000.00
3 Jendela Nako bh 32,800.00
BAHAN LAIN-LAIN
1 Waterstop lebar 230mm - 320mm m 28,000.00
2 Waterproofing liquid Kg 45,581.20
3 Water proofing Membrane m' 125,000.00
4 Material Primer Bitumen Kg 68,000.00
5 Pipa PVC 3/4" m1 5,400.00
6 Minyak Bekisting ltr 7,200.00
7 Solar INDUSTRI ltr 6,560.00
8 Railing hollow 4/4 & 2/4 tebal 1,2mm, termasuk finishing by specialist m1 403,200.00
9 Kanstein uk. 8.40.20 sekeliling bangunan M1 21,600.00
10 Penanaman Pohon Akasia dia 5-10 cm T=2,0 m Buah 1,103,600.00
11 Buis beton setengah lingkaran 30 cm M1 32,000.00
12 Gorong-gorong dia. 60 cm menuju ke riol kota M1 92,000.00
13 Grill penutup saluran, besi siku 50.50.5 + plat strip M1 62,480.00
14 Tangga Dalam 'M' GWT + cat ( model gantung lengkap terpasang ) Unit 1,103,600.00
15 Tangga Luar 'M' GWT + cat ( model gantung lengkap terpasang ) Unit 783,600.00
NO DAFTAR HARGA BAHAN SATUAN Harga
###
16 Penutup mainhole baja (terpasang) Unit 662,160.00
17 List plafond gypsum 5/5 M1 20,160.00
18 Shower Unit 209,920.00
19 Tanah Subur Pasir urug t = 7 cm M3 148,000.00
20 Tanaman Rumput Gajah Mini M2 20,000.00
21 Tanaman Pohon Zodia T= 25-40 cm Batang 14,000.00
22 Tanaman Pohon Mangga dia 5-10 cm T=1,5 m Batang 240,000.00
23 Tanaman Pohon Kelengkeng dia 5-10 cm T=1-1,5 m Batang 240,000.00
24 Tanaman Pohon Rambutan dia 5-10 cm T=1-1,5 m Batang 120,000.00
25 Talang zincalum t= 0,35mm, L=90 cm M1 49,600.00
26 Minyak Tanah L 12,500.00
27 Air M3 25,000.00
28 Minyak Bekisting L 9,000.00
29 pengeboran tanah D 60 cm m' 208,000.00
30 pengeboran tanah D 80 cm m' 272,000.00
31 Menie Cat Besi kg 20,000.00
32 Harga Handrail Stainless Kloset, Bahan pipa 11/4 in tbl 1mm+Ukuran Lebar 80cm x tinggi 75cm Berat 3kg unit 770,000.00
33 Pipa Galvanis 4" 3,5 mm kg 14,000.00
34 CAT DUCO NIPPE 2000 - SUPER BLACK 480 1 LITER kg 28,800.00
35 sika grout 125 (25 kg) zak 78,000.00
36 sika grout 125 (1 kg) kg 3,120.00
37 Mur Baut A325 HTB Dia 12 mm bh 3,052.00
38 Pipa Galvanis 2,5" 3,5 mm kg 16,896.55
39 Pipa Galvanis 3" 3,5 mm kg 18,963.83
40 Cermin Toilet bh 440,000.00
41 Jaring Nyamauk m2 16,000.00
42 Coring Beton Untk Pipa ttk 128,000.00
43 ACRYLIC 3 MM – 4 x 8 BENING M2 421,920.00
44 Cat Ls 20,000.00
45 Lakban Kertas Ls 12,000.00
46 Pen acrylic bh 3,200.00
47 Pasang Pipa PVC dia 100 + Acsessories M1 112,000.00
48 Pasang Pipa PVC dia 50 + Acsessories M1 56,800.00
49 Pasang Pipa Vent unit 120,000.00
SEWA ALAT
1 Sewa mobil pickup hari 320,000.00
2 Sewa alat ukur theodolit hari 383,500.00
3 Sewa tripot/Tackel & handle crane 2T hari 100,000.00
4 Sewa alat bantu ls 22,100.00
5 Sewa alat bantu Jam 9,500.00
6 Sewa alat test Jam 34,000.00
7 Sewa dump truck 5 m3 Jam 85,000.00
8 Sewa dump truck 8 - 10 m3 Jam 110,000.00
9 Molen (concrete mixer 0.125 m3) sewa-hari 600,000.00
10 Molen (concrete mixer 0.35 m3) sewa-hari 250,000.00
11 Pompa dan conveyor beton Jam 250,000.00
12 Crane < 10 ton Jam 300,000.00
13 Crane > 10 ton Jam 300,000.00
14 Crane 30 ton Jam 300,000.00
15 Lift sampai dengan tinggi maksimum 12 m Jam 340,000.00
16 Alat Pancang + Hammer 2 ton Jam 100,000.00
17 Alat Penyambung Tiang Pancang Jam 100,000.00
18 Pemadat Timbunan (stamper) Jam 40,000.00
NO DAFTAR HARGA BAHAN SATUAN Harga
###
19 Tripod Jam 100,000.00
20 Sewa stamper Jam 40,000.00
21 Concrete Vibrator Jam 55,000.00
22 Cronrete pump Jam 500,000.00
23 Sewa Molen hr 200,000.00
24 Excavator Jam 600,000.00
25 Sewa Mesin las Jam 180,000.00
26 Sewa Alat Bor Tanah 60 cm Jam 180,000.00
27 Sewa Alat Bor Tanah D 80 Jam 260,000.00
28 Sewa Alat Bor Tanah D 100 Jam 440,000.00
29 Crane 35 ton Jam 550,000.00
30 Sewa Mobil Buang Lumpur Bore Pile Rit 600,000.00
31 PDA TEST PAKET 10,000,000.00
JERLY HUTAGALUNG
Direktur
DAFTAR HARGA BAHAN MEKANIKAL ELEKTRIKAL
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
G PERALATAN HYDRANT
1 Indoor Hydran Box (IHB) Type B Bh Rp. 1,799,600.00
2 Outdoor Hydran Box (OHB) Type C Bh Rp. 1,513,600.00
3 Hydran pillar 2 ways (Ex. lokal) Bh Rp. 1,452,000.00
4 Siamesse connection (ex. Local) Bh Rp. 1,400,000.00
5 Fire Extinguisher Type CO2 Class B,C Kap. 4,6 kg bh Rp. 323,400.00
6 Fire Extinguisher Type Class A,B,C Kap. 3,5 kg Bh Rp. 162,800.00
H FAN
1 Exhaust Ceiling Mounted Kap. 400 Cfm Bh Rp. 740,000.00
2 Grille 200x200 mm Bh Rp. 100,000.00
3 Grille 100x100 mm Bh Rp. 72,000.00
JERLY HUTAGALUNG
Direktur
DAFTAR HARGA BAHAN ELEKTRIKAL
HARGA
Kelompok NO. NAMA / JENIS BAHAN SATUAN
SATUAN BAHAN
1 2 3 4 5
A BAHAN ELEKTRIKAL
1 Pasang listrik /Wiring Ttk Rp. 24,240.00
2 Lampu TL 1 x 10 w Bh Rp. 16,798.00
3 Lampu TL 1 x 20 w Bh Rp. 25,664.00
4 Lampu TL 1 x 40 w Bh Rp. 34,996.40
5 Lampu pijar 25 w Bh Rp. 6,999.20
6 Lampu pijar 40 - 100 w Bh Rp. 4,030.00
7 Lampu TKI, TL 2x36 watt Bh Rp. 180,000.00
8 Lampu V-SHAPE, TL 2x36 watt Bh Rp. 176,000.00
9 Lampu TL Balk 1x18 watt Bh Rp. 100,000.00
10 Lampu TL Balk 1x18 watt + Battery Bh Rp. 280,000.00
11 Lampu TL Balk 1x36 watt Bh Rp. 116,000.00
12 Lampu Baret 32 watt + Battery Bh Rp. 271,000.00
13 Lampu Baret 32 watt Bh Rp. 91,000.00
14 Lampu LED 7 watt Bh Rp. 50,000.00
15 Lampu LED 7 watt c/w battery charger Bh Rp. 230,000.00
16 Lampu LED 9 watt Bh Rp. 56,000.00
17 Lampu LED 9 watt c/w battery charger Bh Rp. 236,000.00
18 Lampu Downlight 13 watt Bh Rp. 48,000.00
19 Lampu Downlight 18 watt Bh Rp. 60,000.00
20 Lampu Taman SL-26 watt Bh Rp. 340,000.00
21 Lampu Exit 18 watt + Battery Bh Rp. 290,000.00
22 Isolator Bh Rp. 2,545.20
23 Las Doof Bh Rp. 1,018.00
24 Fiting Plafond Bh Rp. 3,400.00
25 T dos PVC Bh Rp. 1,866.40
26 Stop Kontak Wall Type Bh Rp. 15,250.00
27 Stop Kontak Floor Type Bh Rp. 170,000.00
28 Stop Kontak-AC Bh Rp. 26,000.00
29 Stop Kontak-TV Bh Rp. 25,210.00
30 Stop Kontak-TELEPON Bh Rp. 16,726.00
31 Saklar tunggal Bh Rp. 10,800.00
32 Sakla ganda Bh Rp. 18,000.00
33 Saklar Hotel 1 gang Bh Rp. 18,880.00
34 Saklar Hotel 2 gang Bh Rp. 28,000.00
35 Kabel NYA 1000 Volt 1,5 mm M1 Rp. 1,135.20
36 Kabel NYA 1000 Volt 2x1,5 mm M1 Rp. 2,270.40
37 Kabel NYA 1000 Volt 3x1,5 mm M1 Rp. 6,811.20
38 Kabel NYA 1000 Volt 2,5 mm M1 Rp. 1,796.80
39 Kabel NYA 1000 Volt 2x2,5 mm M1 Rp. 3,593.60
40 Kabel NYA 1000 Volt 4 mm M1 Rp. 2,858.80
41 Kabel NYA 1000 Volt 6 mm M1 Rp. 4,279.60
42 Kabel NYA 1000 Volt 10 mm M1 Rp. 7,160.00
43 Kabel NYA 1000 Volt 16 mm M1 Rp. 10,600.00
44 Kabel NYA 1000 Volt 25 mm M1 Rp. 16,960.00
45 Kabel NYA 1000 Volt 35 mm M1 Rp. 23,320.00
46 Kabel NYA 1000 Volt 50 mm M1 Rp. 32,680.00
47 Kabel NYA 1000 Volt 70 mm M1 Rp. 45,800.00
48 Kabel NYA 1000 Volt 95 mm M1 Rp. 61,480.00
49 Kabel NYA 1000 Volt 120 mm M1 Rp. 78,040.00
50 Kabel NYA 1000 Volt 150 mm M1 Rp. 94,560.00
51 Kabel NYA 1000 Volt 185 mm M1 Rp. 119,600.00
52 Kabel NYM 300/750 Volt 3x2,5 mm2 M1 Rp. 5,701.60
53 Kabel NYM 300/750 Volt 3x4 mm2 M2 Rp. 7,700.00
54 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 Rp. 7,840.00
55 Kabel NYY 0,6/1 Kv 4x2,5 mm2 M1 Rp. 9,216.00
56 Kabel NYY 0,6/1 Kv 4x4 mm2 M1 Rp. 13,889.20
57 Kabel NYY 0,6/1 Kv 4x6 mm2 M1 Rp. 19,353.60
58 Kabel NYY 0,6/1 Kv 4x10 mm2 M1 Rp. 26,800.00
59 Kabel NYY 0,6/1 Kv 4x16 mm2 M1 Rp. 47,080.00
60 Kabel NYY 0,6/1 Kv 4x25 mm2 M1 Rp. 72,080.00
61 Kabel NYY 0,6/1 Kv 4x35 mm2 M1 Rp. 97,960.00
62 Kabel NYY 0,6/1 Kv 4x50 mm2 M1 Rp. 133,160.00
63 Kabel NYY 0,6/1 Kv 4x70 mm2 M1 Rp. 188,280.00
64 Kabel NYY 0,6/1 Kv 4x95 mm2 M1 Rp. 258,640.00
65 Kabel NYY 0,6/1 Kv 4x120 mm2 M1 Rp. 323,960.00
66 Kabel NYY 0,6/1 Kv 4x150 mm2 M1 Rp. 398,560.00
67 Kabel NYY 0,6/1 Kv 4x185 mm2 M1 Rp. 495,680.00
68 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 Rp. 648,720.00
69 Kabel NYY 0,6/1 Kv 4x300 mm2 M1 Rp. 806,880.00
70 Kabel NYFGBY 0,6/1 Kv 3x2,5 mm2 M1 Rp. 10,042.00
71 Kabel NYFGBY 0,6/1 Kv 4x16 mm2 M1 Rp. 57,800.00
72 Kabel NYFGBY 0,6/1 Kv 4x240 mm2 M1 Rp. 513,400.00
73 Kabel FRC 0,6/1 Kv 3x2,5 mm2 M1 Rp. 33,960.00
74 Kabel FRC 0,6/1 Kv 4Cx4 mm2 M1 Rp. 60,300.00
75 Kabel FRC 0,6/1 Kv 4Cx6 mm2 M1 Rp. 80,174.00
76 Kabel Coaxial 7C-2V M1 Rp. 6,363.20
77 Kabel Coaxial 5C-2V M1 Rp. 4,242.00
78 Kabel ITC 4x0,6 mm2 M1 Rp. 2,240.00
79 Pipa Konduit HI dia.20 mm M1 Rp. 1,600.00
80 Tray W=200 mm M1 Rp. 93,000.00
81 TEE W=200 mm M1 Rp. 128,200.00
82 Elbow W=200 mm M1 Rp. 119,120.00
83 Heat detector BH Rp. 100,000.00
84 Smoke detector BH Rp. 154,000.00
85 Manual push button BH Rp. 84,000.00
86 Bell alarm BH Rp. 158,800.00
87 Lampu indikator BH Rp. 74,000.00
88 MCFA-10 Zone BH Rp. 3,308,000.00
89 terminal Fire alarm BH Rp. 132,000.00
90 Terminal -TV BH Rp. 100,140.00
91 Antena UHF,10 element BH Rp. 271,488.00
92 Antena VHF,10 element BH Rp. 312,635.60
93 Master Amplifier BH Rp. 187,496.40
94 Arester Lightning Protection R=50 M BH Rp. 2,600,000.00
95 Sekrering Tunggal "LN" biasa Bh Rp. 22,886.80
96 Sekering ganda "LN" biasa Bh Rp. 25,029.60
97 Sekering 1 group + MCB Unit Rp. 33,851.20
98 Sekering 2 group + MCB Unit Rp. 48,358.80
99 Sekering 3 group + MCB Unit Rp. 68,720.40
100 Kwh/1phase Digital Unit Rp. 310,000.00
101 Kwh/3 phase/63 A Digital Unit Rp. 600,000.00
102 MCB,1ph/6/10/16/25 amper Unit Rp. 20,158.00
103 Box panel Hanger Unit Rp. 36,269.20
104 Splitzen T=1 mtr Unit Rp. 140,000.00
105 Grounding box 40x40x40cm Unit Rp. 180,000.00
106 Grounding Rod,1" Unit Rp. 260,000.00
107 Termination ls Rp. 300,000.00
108 BC 50 mm2 M1 Rp. 49,020.00
109 Genset 25 kva Silent type Unit Rp. 43,151,644.00
110 Box Telepon Unit Rp. 167,559.20
111 Jelly armoured 10x2x0,6 mm M1 Rp. 7,846.40
112 Splitter 6 port bh Rp. 49,934.40
113 MDF-FA ( 10 zone ) bh Rp. 550,000.00
114 Kabel NYA 1000 Volt 6x1,5 mm M1 Rp. 3,818.00
115 Kabel NYA 1000 Volt 20x1,5 mm M1 Rp. 29,237.20
116 Pipa Konduit HI dia.32 mm M1 Rp. 4,848.00
117 Pipa Konduit HI 2 x dia.32 mm M1 Rp. 6,787.20
118 MCCB,3P, 300 A bh Rp. 1,581,256.00
119 Box Panel bh Rp. 407,289.60
120 Cu bar ex,japan unit Rp. 208,060.00
121 Tray W=400 mm M1 Rp. 155,520.00
122 TEE W=400 mm bh Rp. 145,280.00
123 Elbow W=400 mm bh Rp. 136,540.00
124 Reduser W=400 mm bh Rp. 147,827.60
125 Tray W=900 mm M1 Rp. 162,702.80
126 Tray W=600 mm M1 Rp. 179,040.00
127 Lampu HPI-T 250 W NR 921 Bh Rp. 1,436,637.20
128 Kabel NYY 0,6/1 Kv 3x2,5 mm2 M1 Rp. 4,772.00
129 Dome Camera P/T/Z WV - CS 570 unit Rp. 4,577,200.00
130 Hard disk Recording 16 Ch (Kap 3 tera) unit Rp. 18,725,600.00
131 Kabel NYY 0,6/1 Kv 4x240 mm2 M1 Rp. 381,780.00
132 Pipa Gip dia.65 mm M1 Rp. 140,000.00
133 Ladder W=200 mm M1 Rp. 89,200.00
134 Ladder TEE W=200 mm M1 Rp. 103,600.00
135 Testing & Commissioning ls Rp. 1,000,000.00
136 Biaya pasang baru daya listrik PLN va Rp. 680.00
137 Tiang Lampu T=1,5 mtr bh Rp. 200,000.00
138 Tiang Lampu T=2,5 mtr bh Rp. 300,000.00
139 Panel MDP bh Rp. 13,700,000.00
140 Panel DB Pengelola bh Rp. 4,019,040.00
141 PP-Unit lt 1 bh Rp. 5,000,000.00
142 PP-Unit lt 2,3,4 bh Rp. 5,000,000.00
143 Panel Kebakaran bh Rp. 6,302,560.00
144 Panel Pompa Air Bersih bh Rp. 4,145,280.00
145 Panel Unit bh Rp. 199,920.00
JERLY HUTAGALUNG
Direktur
DAFTAR UPAH ELEKTRIKAL
JERLY HUTAGALUNG
Direktur
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pembuatan 1 m Pagar sementara dari seng gelombang tinggi 2 m
Acuan : modifikasi
No Uraian Kegiatan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Doke kayu dia 8-10 panjang 4 m Btg 1.2500 10,000.00 12,500.00
2 Semen kg 2.5000 1,175.00 2,937.50
3 Spandek m 1.0000 220,000.00 220,000.00
4 Pasir beton m3 0.0050 160,000.00 800.00
5 Koral beton m3 0.0090 160,000.00 1,440.00
6 Kayu Balok 5/7 m3 0.0360 1,000,000.00 36,000.00 konsinyasi 19 Okt 018
7 Paku 2"-5" kg 0.0600 15,000.00 900.00
8 Meni besi ltr 0.4500 22,000.00 9,900.00
UPAH
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang Kayu OH 0.2000 100,000.00 20,000.00 konsinyasi 19 Okt 018
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0200 120,000.00 2,400.00
Harga Satuan Pekerjaan 325,077.50
Overhead & profit 10% 32,507.75
Dibulatkan 357,585.25
Jenis Pekerjaan : Pengukuran dan Pemasangan Bouwplank m'
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
No Uraian Kegiatan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Kayu Balok 5/7 m3 0.0120 1,000,000.00 12,000.00
2 Paku 2"-3" kg 0.0200 15,000.00 300.00
3 Kayu Papan 2/20 m3 0.0070 1,000,000.00 7,000.00 ###
UPAH
1 Pekerja OH 0.1000 80,000.00 8,000.00
2 Tukang Kayu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0050 120,000.00 600.00 ###
Harga Satuan Pekerjaan 39,000.00
Overhead & profit 10% 3,900.00
Dibulatkan 42,900.00
(K3) Pembuatan 1 m2 gudang semen dan peralatan
No Uraian Kegiatan Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 80,000 80,000.00
Tukang Kayu L.02.04 OH 2.0000 100,000 200,000.00
Kepala Tukang L.03.01 OH 0.2000 110,000 22,000.00
Mandor L.04.01 OH 0.0500 120,000 6,000.00
JUMLAH TENAGA KERJA 308,000.00
B BAHAN -
Dolken kayu Ø 8-10/400 cm Batang 1.7000 10,000 17,000.00
Kayu m3 0.2100 1,000,000 210,000.00
Paku biasa Kg 0.3000 15,000 4,500.00
Semen portland Kg 10.5000 1,175 12,337.50
Pasir beton m3 0.0300 160,000 4,800.00
Koral beton m3 0.0500 160,000 8,000.00
Seng gelombang Lbr 1.5000 28,333 42,500.00
Seng plat Lbr 0.2500 26,400 6,600.00
JUMLAH HARGA BAHAN 305,737.50
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 613,737.50
E Overhead & Profit 10% 10% 61,373.75
F Harga Satuan Pekerjaan (D+E) 675,111.24
Jenis Pekerjaan : Pembersihan dan Perataan Lapangan m2
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.2.2.19
1 2 3 4 5 6
UPAH
1 Pekerja OH 0.1000 80,000 8,000
4 Mandor OH 0.0500 120,000 6,000
Harga Satuan Pekerjaan 14,000
Overhead & profit 10% 1,400.00
Dibulatkan 15,400.00
Jenis Pekerjaan : Galian Tanah Biasa 1 meter m3
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
UPAH
1 Pekerja OH 0.5630 80,000 45,040
2 Mandor OH 0.0563 120,000 6,756
1 2 3 4 5 6
UPAH
1 Pekerja OH 0.6750 80,000 54,000
2 Mandor OH 0.0675 120,000 8,100
1 2 3 4 5 6
UPAH
1 Pekerja OH 1.2500 80,000 100,000
2 Mandor OH 0.1250 120,000 15,000
1 2 3 4 5 6
UPAH
1 Pekerja OH 1.2500 80,000.00 100,000.00
2 Mandor OH 0.1250 120,000.00 15,000.00
1 2 3 4 5 6
SEWA PERALATAN
1 Sewa Dump Truck 5 T (min 5 jam) Jam 0.0670 85,000.00 5,695.00
2 Sewa Escavator 6 m3 Jam 0.0670 600,000.00 40,200.00
UPAH
1 Operator excavator OH 0.0176 120,000.00 2,112.00
2 Pekerja OH 0.2260 80,000.00 18,080.00
3 Mandor OH 0.0070 120,000.00 840.00
1 2 3 4 5 6
UPAH
1 Pekerja OH 0.0500 80,000.00 4,000.00
2 Mandor OH 0.0050 120,000.00 600.00
1 2 3 4 5 6
UPAH
1 Pekerja OH 0.3300 80,000.00 26,400.00
2 Mandor OH 0.0100 120,000.00 1,200.00
1 2 3 4 5 6
UPAH
1 Pekerja OH 0.5000 80,000.00 40,000.00
2 Mandor OH 0.0500 120,000.00 6,000.00
1 2 3 4 5 6
UPAH
1 Pekerja OH 0.5000 80,000.00 40,000.00
2 Mandor OH 0.0500 120,000.00 6,000.00
Harga Satuan Pekerjaan 46,000.00
Overhead & profit 10% 4,600.00
Dibulatkan 50,600.00
Jenis Pekerjaan : Pengurugan 1 m3 dengan Pasir Urug
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Pasir Urug m3 1.2000 160,000.00 192,000.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 217,200.00
Overhead & profit 10% 21,720.00
Dibulatkan 238,920.00
Jenis Pekerjaan : Pengurugan 1 m3 Kerikil
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Kerikil m3 1.2000 160,000.00 192,000.00
UPAH
1 Pekerja OH 0.2500 80,000.00 20,000.00
2 Mandor OH 0.0250 120,000.00 3,000.00
Harga Satuan Pekerjaan 215,000.00
Overhead & profit 10% 21,500.00
Dibulatkan 236,500.00
Jenis Pekerjaan : Memasang Pondasi Batu Belah, Campuran 1 PC : 4 PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Batu Belah 15cm / 20 cm m3 1.2000 180,000.00 216,000.00
2 Semen PC Kg 163.0000 1,175.00 191,525.00
3 Pasir Pasang m3 0.5200 160,000.00 83,200.00
UPAH
1 Pekerja OH 1.5000 80,000.00 120,000.00
2 Tukang Batu OH 0.7500 100,000.00 75,000.00
3 Kepala Tukang OH 0.0750 110,000.00 8,250.00
4 Mandor OH 0.0750 120,000.00 9,000.00
Harga Satuan Pekerjaan 702,975.00
Overhead & profit 10% 70,297.50
Dibulatkan 773,272.50
Jenis Pekerjaan : Pemasangan 1m3 Batu Kosong ( Aanstamping )
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Batu Belah 15cm / 20 cm m3 1.2000 180,000.00 216,000.00
2 Pasir Urug m3 0.4320 160,000.00 69,120.00
UPAH
1 Pekerja OH 0.7800 80,000.00 62,400.00
2 Tukang Batu OH 0.3900 100,000.00 39,000.00
3 Kepala Tukang OH 0.0390 110,000.00 4,290.00
4 Mandor OH 0.0390 120,000.00 4,680.00
Harga Satuan Pekerjaan 395,490.00
Overhead & profit 10% 39,549.00
Dibulatkan 435,039.00
Jenis Pekerjaan : Memasang 1m2 dinding bata ringan tebal 7.5 cm dengan mortar siap pakai
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.1.25
1 2 3 4 5 6
BAHAN
1 Bata ringan tebal 7.5 cm bh 8.4000 6,000.00 50,400.00
2 Mortar siap pakai Kg 0.4500 1,400.00 630.00
UPAH
1 Pekerja OH 0.6710 80,000.00 53,680.00
2 Tukang Batu OH 0.1300 100,000.00 13,000.00
3 Kepala Tukang OH 0.0130 110,000.00 1,430.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 119,500.00
Overhead & profit 10% 11,950.00
Dibulatkan 131,450.00
Jenis Pekerjaan : Memasang 1m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
Acuan : Modifikasi/ Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.1.26
1 2 3 4 5 6
BAHAN
1 Bata ringan tebal 10 cm bh 8.4000 7,200.00 60,480.00
2 Mortar siap pakai Kg 0.6300 1,800.00 1,134.00
UPAH
1 Pekerja OH 0.6710 80,000.00 53,680.00
2 Tukang Batu OH 0.1300 100,000.00 13,000.00
3 Kepala Tukang OH 0.0130 110,000.00 1,430.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 130,084.00
Overhead & profit 10% 13,008.40
Dibulatkan 143,092.40
Jenis Pekerjaan : Memasang 1m2 dinding bata merah tebal 1/2 bata camp 1PC : 5PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Bata Merah Buah 70.0000 600.00 42,000.00
2 PC Kg 9.6800 1,175.00 11,374.00
3 PP m3 0.0450 160,000.00 7,200.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 97,474.00
Overhead & profit 10% 9,747.40
Dibulatkan 107,221.40
Jenis Pekerjaan : Memasang 1m2 dinding bata merah tebal 1/2 bata camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Bata Merah Buah 70.0000 600.00 42,000.00
2 PC Kg 14.3700 1,175.00 16,884.75
3 PP m3 0.0400 160,000.00 6,400.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 102,184.75
Overhead & profit 10% 10,218.48
Dibulatkan 112,403.23
Jenis Pekerjaan : Memasang 1m2 dinding bata merah tebal 1 bata camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Bata Merah Buah 140.0000 600.00 84,000.00
2 PC Kg 22.2000 1,175.00 26,085.00
3 PP m3 0.1020 160,000.00 16,320.00
UPAH
1 Pekerja OH 0.6000 80,000.00 48,000.00
2 Tukang Batu OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0300 120,000.00 3,600.00
Harga Satuan Pekerjaan 200,205.00
Overhead & profit 10% 20,020.50
Dibulatkan 220,225.50
Jenis Pekerjaan : Pemasangan 1 m2 Dinding Terawang (Rooster) 18x18 camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan A.4.4.1.22
1 2 3 4 5 6
BAHAN
1 Bata Roster Buah 30.0000 6,900.00 207,000.00
2 PC Kg 11.0000 1,175.00 12,925.00
3 PP m3 0.0350 160,000.00 5,600.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 262,425.00
Overhead & profit 10% 26,242.50
Dibulatkan 288,667.50
Jenis Pekerjaan : Pemasangan 1 m2 batu alam camp 1PC : 3PP
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan A.4.4.1.22
No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Batu Alam m2 1.0000 150,000.00 150,000.00
2 PC Kg 11.0000 1,175.00 12,925.00
3 PP m3 0.0350 160,000.00 5,600.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 205,425.00
Overhead & profit 10% 20,542.50
Dibulatkan 225,967.50
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran 1 PC : 5 PP, Tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Semen PC Kg 5.1840 1,175.00 6,091.20
2 Pasir Pasang m3 0.0260 160,000.00 4,160.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 52,701.20
Overhead & profit 10% 57,971.32
Asumsi 30% yg dirapihkan 5,797.13
Dibulatkan 63,768.45
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran 1 PC : 3 PP, Tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.2.3
1 2 3 4 5 6
BAHAN
1 Semen PC Kg 7.7760 1,175.00 9,136.80
2 Pasir Pasang m3 0.0230 160,000.00 3,680.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 55,266.80
Overhead & profit 10% 5,526.68
Dibulatkan 60,793.48 plester
Jenis Pekerjaan : Pemasangan 1 m2 berapen 1SP : 5PP tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Semen PC Kg 5.1840 1,175.00 6,091.20
2 Pasir m3 0.0260 160,000.00 4,160.00
UPAH
1 Pekerja OH 0.1500 80,000.00 12,000.00
2 Tukang Batu OH 0.0750 100,000.00 7,500.00
3 Kepala Tukang OH 0.0080 110,000.00 880.00
4 Mandor OH 0.0080 120,000.00 960.00
Harga Satuan Pekerjaan 31,591.20
Overhead & profit 10% 3,159.12
Dibulatkan 34,750.32
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran 1SP : 2PP tebal 15 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.2.2
1 2 3 4 5 6
BAHAN
1 Semen PC Kg 10.2240 1,175.00 12,013.20
2 Pasir m3 0.0200 160,000.00 3,200.00
UPAH
1 Pekerja OH 0.3000 80,000.00 24,000.00
2 Tukang Batu OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0150 120,000.00 1,800.00
Harga Satuan Pekerjaan 57,663.20
Overhead & profit 10% 5,766.32
Dibulatkan 63,429.52
Jenis Pekerjaan : Pemasangan 1 m2 Plesteran dengan mortar siap pakai (MSP)
Acuan : pemndekatan
1 2 3 4 5 6
BAHAN
1 Plesteran Mortar ( MU - 200 ) Kg 4.9000 1,800.00 8,820.00
UPAH
1 Pekerja OH 0.1300 80,000.00 10,400.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0070 120,000.00 840.00
Harga Satuan Pekerjaan 31,160.00
Overhead & profit 10% 3,116.00
Dibulatkan 34,276.00 acian
Jenis Pekerjaan : Pemasangan 1 m2 acian
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.2.27
1 2 3 4 5 6
BAHAN
1 Semen PC Kg 3.2500 1,175.00 3,818.75
UPAH
1 Pekerja OH 0.2000 80,000.00 16,000.00
2 Tukang Batu OH 0.1000 100,000.00 10,000.00
3 Kepala Tukang OH 0.0100 110,000.00 1,100.00
4 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 32,118.75
Overhead & profit 10% 3,211.88
Dibulatkan 35,330.63
Jenis Pekerjaan : Pemasangan 1 m' Benangan
Acuan : Pendekatan
1 2 3 4 5 6
BAHAN
1 Semen PC Kg 0.5000 1,175.00 587.50
2 Pasir pasang m3 0.0130 160,000.00 2,080.00
UPAH
1 Pekerja OH 0.0800 80,000.00 6,400.00
2 Tukang Batu OH 0.0400 100,000.00 4,000.00
3 Kepala Tukang OH 0.0400 110,000.00 4,400.00
4 Mandor OH 0.0040 120,000.00 480.00
Harga Satuan Pekerjaan 17,947.50
Overhead & profit 10% 1,794.75
Dibulatkan 19,742.25
Jenis Pekerjaan : Membuat 1 m' Kolom praktis 11x11
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.1.1.35
1 2 3 4 5 6
BAHAN
1 Kayu klas III m3 0.0020 1,000,000.00 2,000.00
Paku 5-12 cm kg 0.0100 15,000.00 150.00
Besi beton polos kg 3.0000 11,000.00 33,000.00
Kawat beton kg 0.4500 20,000.00 9,000.00
Semen Portland kg 4.0000 1,175.00 4,700.00
Pasir beton m3 0.0060 160,000.00 960.00
Kerikil m3 0.0090 160,000.00 1,440.00
UPAH
1 Pekerja OH 0.1800 80,000.00 14,400.00
2 Tukang Batu OH 0.0200 100,000.00 2,000.00
3 Tukang kayu OH 0.0200 100,000.00 2,000.00
4 Tukang besi OH 0.0200 100,000.00 2,000.00
5 Kepala Tukang OH 0.0060 110,000.00 660.00
6 Mandor OH 0.0090 120,000.00 1,080.00
Harga Satuan Pekerjaan 73,390.00
Overhead & profit 10% 7,339.00
Dibulatkan 80,729.00
Jenis Pekerjaan : Membuat 1 m2 Bongkar Bekisting
Acuan :
UPAH
1 Pekerja oh 0.2000 80,000.00 16,000.00
4 Mandor oh 0.0200 120,000.00 2,400.00
Harga Satuan Pekerjaan 18,400.00
Overhead & profit 10% 1,840.00
Dibulatkan 20,240.00
1 2 3 4 5 6
SEWA PERLATAN
1 Sewa welding set ( min 5 jam ) jam 0.8000 180,000.00 144,000.00
BAHAN
1 Solar ltr 1.0000 6,560.00 6,560.00
2 Minyak pelumas ltr 0.1000 30,000.00 3,000.00
UPAH
1 Pekerja oh 0.1000 80,000.00 8,000.00
2 Mandor oh 0.0050 120,000.00 600.00
3 Kepala tukang oh 0.0010 110,000.00 110.00
4 Tukang besi oh 0.1000 100,000.00 10,000.00
Harga Satuan Pekerjaan 172,270.00
Overhead & profit 10% 189,497.00
Dibulatkan 18,949.70
1Kg Fabrikasi 208,446.70
Jenis Pekerjaan : Pemasangan 1 kg besi profil WF
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Baja WF kg 1.1500 14,000.00 16,100.00
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang las konstruksi oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 27,920.00
Overhead & profit 10% 2,792.00
Dibulatkan 30,712.00
Jenis Pekerjaan : Pemasangan 1 kg besi profil canal
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan)
1 2 3 4 5 6
BAHAN
1 Baja C kg 1.1500 14,000.00 16,100.00
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang las konstruksi oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 27,920.00
Overhead & profit 10% 2,792.00
Dibulatkan 30,712.00
Jenis Pekerjaan : Pemasangan 1 kg besi profil siku
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan)
1 2 3 4 5 6
BAHAN
1 Baja Siku kg 1.1500 36,250.00 41,687.50
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang las konstruksi oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 53,507.50
Overhead & profit 10% 5,350.75
Dibulatkan 58,858.25
Jenis Pekerjaan : (1KG) BESI PLAT
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya (Pendekatan)
1 2 3 4 5 6
BAHAN
1 Baja Plat kg 1.1000 14,000.00 15,400.00
2 Kawat las kg 0.0200 55,000.00 1,100.00
UPAH
1 Pekerja oh 0.0600 80,000.00 4,800.00
2 Tukang oh 0.0600 100,000.00 6,000.00
3 Kepala tukang oh 0.0060 110,000.00 660.00
4 Mandor oh 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 28,320.00
Overhead & profit 10% 2,832.00
Dibulatkan 31,152.00
Jenis Pekerjaan : Pengecatan Epoxi (2 lapis cat)
Acuan :
1 2 3 4 5 6
BAHAN
1 Cat Epoxy Kg 1.0000 56,000.00 56,000.00
UPAH
1 Pekerja OH 0.0600 80,000.00 4,800.00
2 Tukang Cat OH 0.1890 100,000.00 18,900.00
3 Kepala Tukang OH 0.0189 110,000.00 2,079.00
4 Mandor OH 0.0090 120,000.00 1,080.00
Harga Satuan Pekerjaan 82,859.00
Overhead & profit 10% 8,285.90
Dibulatkan 91,144.90
Jenis Pekerjaan : Pengecatan Tembok Baru (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.1.10
1 2 3 4 5 6
BAHAN
1 Plamir tembok Ltr 0.1000 24,800.00 2,480.00
2 Cat Dasar Kg 0.1000 16,800.00 1,680.00
3 Cat Penutup 2x Kg 0.2600 18,400.00 4,784.00
UPAH
1 Pekerja OH 0.0200 80,000.00 1,600.00
2 Tukang Cat OH 0.0630 100,000.00 6,300.00
3 Kepala Tukang OH 0.0063 110,000.00 693.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 17,897.00
Overhead & profit 10% 1,789.70
Dibulatkan 19,686.70
Jenis Pekerjaan : Pengecatan Tembok Baru (1 lapis Plamir, 1 lapis cat dasar, 2 lapis cat penutup)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.1.10
1 2 3 4 5 6
BAHAN
1 Plamir tembok Ltr 0.1000 24,800.00 2,480.00
2 Cat Dasar exterior Kg 0.1000 16,800.00 1,680.00
3 Cat Penutup 2x exterior Kg 0.2600 76,800.00 19,968.00
UPAH
1 Pekerja OH 0.0200 80,000.00 1,600.00
2 Tukang Cat OH 0.0630 100,000.00 6,300.00
3 Kepala Tukang OH 0.0063 110,000.00 693.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 33,081.00
Overhead & profit 10% 3,308.10
Dibulatkan 36,389.10
Satuan : Pengecatan Permukaan Baja lapis seng secara manual 3 lapis cat konvensional (M2)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Cat Dasar Kg 0.1100 22,000.00 2,420.00
2 Cat Antara Kg 0.1700 41,600.00 7,072.00
3 Cat Penutup 2 kali Kg 0.1600 41,600.00 6,656.00
UPAH
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang Batu OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0025 120,000.00 300.00
Harga Satuan Pekerjaan 23,608.00
Overhead & profit 10% 2,360.80
Dibulatkan 25,968.80
Satuan : Pengecatan Permukaan Baja lapis seng secara manual 3 lapis cat konvensional (M2)
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Manie besi Kg 0.1100 22,000.00 2,420.00
2 Manie antara Kg 0.1700 22,000.00 3,740.00
3 Manie Penutup Kg 0.0800 22,000.00 1,760.00
4 Kuas buah 0.0100 12,800.00 128.00
5 Pengencer liter 0.0100 20,000.00 200.00
UPAH
1 Pekerja OH 0.0200 80,000.00 1,600.00
2 Tukang Batu OH 0.2000 100,000.00 20,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0030 120,000.00 360.00
Harga Satuan Pekerjaan 32,408.00
Overhead & profit 10% 3,240.80
Dibulatkan 35,648.80
Satuan : Pengecatan bidang kayu baru 1lapis plamir, 1lapis cat dasar, 2lapis cat penutup (M2)
Acuan : HSPK No. 007 th 2005; Hal. 109
1 2 3 4 5 6
BAHAN
1 Plamir Kg 0.1500 24,800.00 3,720.00
2 Cat Dasar Kg 0.1700 41,600.00 7,072.00
3 Cat penutup 2 kali Kg 0.2600 41,600.00 10,816.00
4 Cat meni Kg 0.2000 22,000.00 4,400.00
UPAH
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang Batu OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0025 120,000.00 300.00
Harga Satuan Pekerjaan 33,468.00
Overhead & profit 10% 3,346.80
Dibulatkan 36,814.80
Satuan : Pengecatan Waterproofing 2lapis (M2)
Acuan : Pendekatan
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Waterproofing 3 kali Kg 0.5800 45,581.20 26,437.10
UPAH
1 Pekerja OH 0.0700 80,000.00 5,600.00
2 Tukang Batu OH 0.0090 100,000.00 900.00
3 Kepala Tukang OH 0.0060 110,000.00 660.00
4 Mandor OH 0.0025 120,000.00 300.00
Harga Satuan Pekerjaan 33,897.10
Overhead & profit 10% 3,389.71
Dibulatkan 37,286.81
Satuan : screed 3 cm (M2)
Acuan : Pendekatan
No Kebutuhan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 2 3 4 5 6
BAHAN
1 Profil aluminium m 1.1000 88,000.00 96,800.00
2 Sekrup fixer bh 2.0000 750.00 1,500.00
3 Sealent tube 0.0600 50,000.00 3,000.00
UPAH
1 Pekerja OH 0.0430 80,000.00 3,440.00
2 Tukang khusus aluminium OH 0.0430 100,000.00 4,300.00
3 Kepala Tukang OH 0.0043 110,000.00 473.00
4 Mandor OH 0.0021 120,000.00 252.00
Harga Satuan Pekerjaan 109,765.00
Overhead & profit 10% 10,976.50
Dibulatkan 120,741.50 oke, Konsinyasi
Jenis Pekerjaan : Pemasangan 1 m Selimar aluminium
Acuan : Pendekatan
1 2 3 4 5 6
BAHAN
1 Profil selimar aluminium m 1.1000 110,000.00 121,000.00 edit harga satuan
2 Sekrup fixer bh 2.0000 750.00 1,500.00
3 Sealent tube 0.0600 50,000.00 3,000.00
4 Karet m1 1.1000 3,000.00 3,300.00
UPAH
1 Pekerja OH 0.0430 80,000.00 3,440.00
2 Tukang khusus aluminium OH 0.0430 100,000.00 4,300.00
3 Kepala Tukang OH 0.0043 110,000.00 473.00
4 Mandor OH 0.0021 120,000.00 252.00
Harga Satuan Pekerjaan 137,265.00
Overhead & profit 10% 13,726.50
Dibulatkan 150,991.50 oke, Konsinyasi
Jenis Pekerjaan : Pemasangan 1 m2 Kaca polos t= 5 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.2.17
1 2 3 4 5 6
BAHAN
1 Kaca t=5 mm m2 1.1000 76,000.00 83,600.00
2 Sealent tube 0.0500 50,000.00 2,500.00
UPAH
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang khusus aluminium OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 120,000.00 96.00
Harga Satuan Pekerjaan 104,046.00
Overhead & profit 10% 10,404.60
Dibulatkan 114,450.60
Jenis Pekerjaan : Pemasangan 1 m2 Kaca Tempered t= 8 mm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.6.2.17
1 2 3 4 5 6
BAHAN
1 Kaca Tempered 8 mm m2 1.1000 123,200.00 135,520.00
2 Sealent tube 0.0500 50,000.00 2,500.00
UPAH
1 Pekerja OH 0.0150 80,000.00 1,200.00
2 Tukang khusus aluminium OH 0.1500 100,000.00 15,000.00
3 Kepala Tukang OH 0.0150 110,000.00 1,650.00
4 Mandor OH 0.0008 120,000.00 96.00
Harga Satuan Pekerjaan 155,966.00
Overhead & profit 10% 15,596.60
Dibulatkan 171,562.60
Jenis Pekerjaan : Pemasangan 1 m2 Pintu aluminium strip lebar 8 cm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.2.1.12
1 2 3 4 5 6
BAHAN
1 Profil aluminium m 4.4000 88,000.00 387,200.00
2 Aluminium strip m 14.6000 25,000.00 365,000.00
UPAH
1 Pekerja OH 0.0850 80,000.00 6,800.00
2 Tukang khusus aluminium OH 0.0850 100,000.00 8,500.00
3 Kepala Tukang OH 0.0085 110,000.00 935.00
4 Mandor OH 0.0042 120,000.00 504.00
Harga Satuan Pekerjaan 768,939.00
Overhead & profit 10% 76,893.90
Dibulatkan 845,832.90
Jenis Pekerjaan : Pemasangan 1 m2 Pintu kaca rangka aluminium
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.2.1.13
1 2 3 4 5 6
BAHAN
1 Profil aluminium m 4.4000 88,000.00 387,200.00
2 Profil kaca m 4.5000 5,000.00 22,500.00
3 Sealent tube 0.2700 50,000.00 13,500.00
UPAH
1 Pekerja OH 0.0850 80,000.00 6,800.00
2 Tukang khusus aluminium OH 0.0850 100,000.00 8,500.00
3 Kepala Tukang OH 0.0090 110,000.00 990.00
4 Mandor OH 0.0050 120,000.00 600.00
Harga Satuan Pekerjaan 440,090.00
Overhead & profit 10% 44,009.00
Dibulatkan 484,099.00
Jenis Pekerjaan : membuat dan memasang 1 m3 kusen pintu dan jendela ,kayu kelas ll dan lll
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya
1 2 3 4 5 6
BAHAN
1 Balok kayu m3 1.2000 1,000,000.00 1,200,000.00
2 Paku 10 cm kg 1.2500 15,000.00 18,750.00
3 Lem kayu kg 1.0000 23,848.00 23,848.00
UPAH
1 Pekerja OH 6.0000 80,000.00 480,000.00
2 Tukang kayu OH 18.0000 100,000.00 1,800,000.00
3 Kepala Tukang OH 1.8000 110,000.00 198,000.00
4 Mandor OH 0.3000 120,000.00 36,000.00
Harga Satuan Pekerjaan 3,756,598.00
Overhead & profit 10% 375,659.80
Dibulatkan 4,132,257.80
Jenis Pekerjaan : memasang 1 m2 lantai HT ukuran ( 60 x 60 ) cm polish
Acuan : Modifikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.9
1 2 3 4 5 6
BAHAN
1 HT Bh 2.9167 42,666.66 124,444.43
2 Semen PC kg 9.6000 1,175.00 11,280.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 1.1000 10,000.00 11,000.00 konsinyasi 19 Okt
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.1200 100,000.00 12,000.00
3 Kepala Tukang OH 0.0120 110,000.00 1,320.00
4 Mandor OH 0.0120 120,000.00 1,440.00 ###
Harga Satuan Pekerjaan 187,884.43
Overhead & profit 10% 18,788.44
Dibulatkan 206,672.87
Jenis Pekerjaan : memasang 1 m2 lantai HT ukuran ( 60 x 60 ) cm unpolish
Acuan : Modiikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.9
1 2 3 4 5 6
BAHAN
1 Ubin keramik Bh 25.0000 1,792.00 44,800.00
2 Semen PC kg 11.0000 1,175.00 12,925.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.2400 100,000.00 24,000.00
3 Kepala Tukang OH 0.1200 110,000.00 13,200.00
4 Mandor OH 0.1200 120,000.00 14,400.00
Harga Satuan Pekerjaan 140,725.00
Overhead & profit 10% 14,072.50
Dibulatkan 154,797.50
Jenis Pekerjaan : memasang 1 m2 lantai keramik ukuran ( 30 x 30 ) cm polos
Acuan : Modifikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.8
1 2 3 4 5 6
BAHAN
1 Ubin keramik Bh 12.0000 4,145.45 49,745.40
2 Semen PC kg 10.4000 1,175.00 12,220.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.3600 80,000.00 28,800.00
2 Tukang batu OH 0.1800 100,000.00 18,000.00
3 Kepala Tukang OH 0.0180 110,000.00 1,980.00
4 Mandor OH 0.0180 120,000.00 2,160.00
Harga Satuan Pekerjaan 125,105.40
Overhead & profit 10% 12,510.54
Dibulatkan 137,615.94
Jenis Pekerjaan : memasang 1 m2 lantai keramik ukuran ( 30 x 30 ) cm Un polish
Acuan : Modifikasi / Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.8
No Uraian Pekerjaan Satuan Indeks Harga Satuan Jumlah
1 2 3 4 5 6
BAHAN
1 Ubin keramik Bh 12.0000 4,666.66 55,999.92
2 Semen PC kg 10.4000 1,175.00 12,220.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00
2 Tukang batu OH 0.2400 100,000.00 24,000.00
3 Kepala Tukang OH 0.1200 110,000.00 13,200.00
4 Mandor OH 0.1200 120,000.00 14,400.00
Harga Satuan Pekerjaan 151,219.92
Overhead & profit 10% 15,121.99
Dibulatkan 166,341.91
Jenis Pekerjaan : memasang 1 m2 lantai keramik ( 40 x 40 ) cm unpolish
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.7
1 2 3 4 5 6
BAHAN
1 Ubin keramik bh 6.6300 24,666.66 163,539.96
2 Semen PC kg 9.8000 1,175.00 11,515.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 1.3000 10,000.00 13,000.00
UPAH
1 Pekerja OH 0.6500 80,000.00 52,000.00
2 Tukang batu OH 0.3500 100,000.00 35,000.00
3 Kepala Tukang OH 0.0350 110,000.00 3,850.00
4 Mandor OH 0.0350 120,000.00 4,200.00
Harga Satuan Pekerjaan 290,304.96
Overhead & profit 10% 29,030.50
Dibulatkan 319,335.45
Jenis Pekerjaan : memasang 1 m' Step nozing ( 10 x 60 ) cm
Acuan :
1 2 3 4 5 6
BAHAN
1 Step nozing bh 1.6670 15,200.00 25,338.40
2 Semen PC kg 1.0400 1,175.00 1,222.00
3 Pasir Pasang m3 0.0050 160,000.00 800.00
4 semen warna kg 0.1000 10,000.00 1,000.00
UPAH
1 Pekerja OH 0.1150 80,000.00 9,200.00
2 Tukang batu OH 0.0100 100,000.00 1,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0100 120,000.00 1,200.00 ###
Harga Satuan Pekerjaan 41,960.40
Overhead & profit 10% 4,196.04
Dibulatkan 46,156.44
Jenis Pekerjaan : memasang 1 m' Plint lantai ukuran ( 10 x 60 ) cm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.39
1 2 3 4 5 6
BAHAN
1 Plin bh 1.6670 12,800.00 21,337.60 cek
2 Semen PC kg 1.0400 1,175.00 1,222.00
3 Pasir Pasang m3 0.0050 160,000.00 800.00
4 semen warna kg 0.1000 10,000.00 1,000.00
UPAH
1 Pekerja OH 0.1150 80,000.00 9,200.00
2 Tukang batu OH 0.0100 100,000.00 1,000.00
3 Kepala Tukang OH 0.0200 110,000.00 2,200.00
4 Mandor OH 0.0100 120,000.00 1,200.00
Harga Satuan Pekerjaan 37,959.60
Overhead & profit 10% 3,795.96
Dibulatkan 41,755.56
Jenis Pekerjaan : memasang 1 m2 Keramik dinding ukuran ( 30 x 60 ) cm
Acuan : Pendekatan
1 2 3 4 5 6
BAHAN
1 Keramik 30x60 Buah 6.0000 14,666.66 87,999.96
2 Semen PC kg 9.3000 1,175.00 10,927.50
3 Pasir Pasang m3 0.0180 160,000.00 2,880.00
4 Semen warna kg 0.2000 10,000.00 2,000.00 ###
UPAH
1 Pekerja OH 0.2400 80,000.00 19,200.00 ###
2 Tukang batu OH 0.2400 100,000.00 24,000.00
3 Kepala Tukang OH 0.1200 110,000.00 13,200.00
4 Mandor OH 0.1200 120,000.00 14,400.00
Harga Satuan Pekerjaan 174,607.46
Overhead & profit 10% 17,460.75
Dibulatkan 192,068.21
1 2 3 4 5 6
BAHAN
1 Profil Galvalum m 4.0000 14,000 56,000
2 Profil Reng baja ringan m 5.0000 6,000 30,000
3 Dinabolt buah 0.7000 1,600 1,120
4 Sekrup fixer buah 45.0000 320 14,400
5 Alumunium foil 1 sisi m2 1.0000 - -
UPAH
1 Tukang OH 0.3400 100,000 34,000
2 Kepala Tukang OH 0.0340 110,000 3,740
3 Mandor OH 0.0340 120,000 4,080 ###
Harga Satuan Pekerjaan 143,340
Overhead & profit 10% 14,334.00
Dibulatkan 157,674.00
Jenis Pekerjaan : 1 M2 Pasang Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan :
1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 4.0000 14,000.00 56,000.00
2 Paku skrup Kg 0.1500 14,000.00 2,100.00
UPAH
1 Pekerja Or Hr 0.3000 80,000.00 24,000.00
2 Tukang besi Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0150 110,000.00 1,650.00
4 Mandor Or Hr 0.0075 120,000.00 900.00
1 2 3 4 5 6
BAHAN
1 Gypsumboard lbr 0.3640 58,520.00 21,301.28
2 Paku skrup Kg 0.1100 14,000.00 1,540.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0050 120,000.00 600.00
1 2 3 4 5 6
BAHAN
1 GRC board lbr 0.3640 60,000.00 21,840.00
2 Paku skrup Kg 0.1100 14,000.00 1,540.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0050 120,000.00 600.00
1 2 3 4 5 6
BAHAN
1 List Gypsum m 1.0500 6,000.00 6,300.00
2 Paku skrup Kg 0.0100 14,000.00 140.00
UPAH
1 Pekerja Or Hr 0.0500 80,000.00 4,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0030 120,000.00 360.00
1 2 3 4 5 6
BAHAN
1 GRC lebar 30 cm tb=9 mm m' 1.0500 16,000.00 16,800.00
2 Paku sekrup Kg 0.0500 14,000.00 700.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.2000 100,000.00 20,000.00
3 KepalaTukang Kayu Or Hr 0.0200 110,000.00 2,200.00
4 Mandor Or Hr 0.0050 120,000.00 600.00
1 2 3 4 5 6
BAHAN
1 Spandek berpasir m' 1.0500 93,500.00 98,175.00
2 Skrup buah 9.0000 750.00 6,750.00
3 Alumenium Foil m2 6,000.00 -
UPAH
1 Pekerja Or Hr 0.1500 80,000.00 12,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0800 110,000.00 8,800.00
4 Mandor Or Hr 0.0060 120,000.00 720.00
1 2 3 4 5 6
BAHAN
1 Gypsumboard lbr 0.7280 58,520.00 42,602.56
2 Rockwall m2 1.1000 24,444.44 26,888.88
3 Paku skrup Kg 0.2000 14,000.00 2,800.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Tukang Kayu Or Hr 0.0500 100,000.00 5,000.00
3 Kepala Tukang Kayu Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0050 120,000.00 600.00
1 2 3 4 5 6
BAHAN
1 Plat Track m' 0.8000 12,000.00 9,600.00
2 Plat Stud m' 4.0000 13,200.00 52,800.00
3 Scrup Kg 0.2500 11,200.00 2,800.00
UPAH
1 Pekerja Or Hr 0.1750 80,000.00 14,000.00
2 Tukang besi Or Hr 0.1750 100,000.00 17,500.00
3 Kepala Tukang Or Hr 0.0175 110,000.00 1,925.00
4 Mandor Or Hr 0.0090 120,000.00 1,080.00
1 2 3 4 5 6
BAHAN
1 Genteng kodok Bh 25.0000 3,040.00 76,000.00
UPAH
1 2 3 4 5 6
BAHAN
1 Nok Genteng metal Buah 0.8500 20,000.00 17,000.00
2 Skrup Buah 6.0000 750.00 4,500.00
UPAH
1 Pekerja Or Hr 0.2500 80,000.00 20,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0150 110,000.00 1,650.00
4 Mandor Or Hr 0.0130 120,000.00 1,560.00
1 2 3 4 5 6
BAHAN
1 Closet duduk biasa Buah 1.0000 1,000,000.00 1,000,000.00
2 Perlengkapan ls 6% x closet 60,000.00 60,000.00
UPAH
1 Pekerja Or Hr 3.3000 80,000.00 264,000.00
2 Tukang Or Hr 1.1000 100,000.00 110,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.1600 120,000.00 19,200.00
1 2 3 4 5 6
BAHAN
1 Urinoir Buah 1.0000 280,000.00 280,000.00
2 Perlengkapan ls 6% x Urinoir 16,800.00 16,800.00
UPAH
1 Pekerja Or Hr 3.3000 80,000.00 264,000.00
2 Tukang Or Hr 1.1000 100,000.00 110,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.1600 120,000.00 19,200.00
1 2 3 4 5 6
BAHAN
1 Closet duduk buang belakang Buah 1.0000 2,800,000.00 2,800,000.00
2 Perlengkapan ls 6% x closet 168,000.00 168,000.00
UPAH
1 Pekerja Or Hr 3.3000 80,000.00 264,000.00
2 Tukang Or Hr 1.1000 100,000.00 110,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.1600 120,000.00 19,200.00
1 2 3 4 5 6
BAHAN
1 Closet Jongkok "Lokal" Unit 1.0000 128,000.00 128,000.00
2 Semen PC 50 kg Kg 6.0000 1,175.00 7,050.00
2 Pasir Pasang M3 0.0100 160,000.00 1,600.00
UPAH
1 Pekerja Or Hr 0.5000 80,000.00 40,000.00
2 Tukang Or Hr 0.7500 100,000.00 75,000.00
3 Kepala Tukang Or Hr 0.0800 110,000.00 8,800.00
4 Mandor Or Hr 0.0750 120,000.00 9,000.00
1 2 3 4 5 6
BAHAN
1 Partisi Urinoir Buah 1.0000 840,000.00 840,000.00
2 Perlengkapan ls 6% x Part. Urinoi 50,400.00 50,400.00
UPAH
1 Pekerja Or Hr 1.6500 80,000.00 132,000.00
2 Tukang Or Hr 0.5500 100,000.00 55,000.00
3 Kepala Tukang Or Hr 0.0050 110,000.00 550.00
4 Mandor Or Hr 0.0800 120,000.00 9,600.00
1 2 3 4 5 6
BAHAN
1 Jet Washer Buah 1.0000 60,000.00 60,000.00
2 Kran Toilet Buah 1.0000 75,000.00 75,000.00
3 Perlengkapan ls 0.4000 12,800.00 5,120.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
1 2 3 4 5 6
BAHAN
1 Floor drain stainless Buah 1.0000 30,000.00 30,000.00
2 Perlengkapan ls 0.4000 12,800.00 5,120.00
UPAH
1 Pekerja Or Hr 0.1000 80,000.00 8,000.00
2 Pekera coring beton ls 1.0000 128,000.00 128,000.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 80,000 800.00
2 Tukang batu L.02 OH 0.100 100,000 10,000.00
3 Kepala tukang L.03 OH 0.010 110,000 1,100.00
4 Mandor L.04 OH 0.005 120,000 600.00
JUMLAH TENAGA KERJA 12,500.00
B BAHAN
1 Kran Shower Unit 1.000 250,000.00 250,000.00
2 Seal tape Bh 0.025 12,800.00 320.00
JUMLAH HARGA BAHAN 250,320.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 262,820.00
E Overhead & Profit (Contoh 10%) 10% x D 26,282.00
F Harga Satuan Pekerjaan (D+E) 289,102.00
Jenis Pekerjaan : Pemasangan 1 buah wastafel meja - Toilet Umum
Acuan : Pendekatan A.5.1.1.1
1 2 3 4 5 6
BAHAN
Wastafel unit 1.0000 560,000.00 560,000.00
kran set unit 1.0000 82,500.00 82,500.00
Semen kg 6.0000 1,175.00 7,050.00
Pasir pasang m3 - 160,000.00 -
Perlengkapan % - - -
UPAH
Pekerja Or Hr 1.2000 80,000.00 96,000.00
2 Tukang Or Hr 1.4500 100,000.00 145,000.00
3 Kepala Tukang Or Hr 0.1500 110,000.00 16,500.00
4 Mandor Or Hr 0.0600 120,000.00 7,200.00
1 2 3 4 5 6
BAHAN
1 Wastafel + kran set unit 1.0000 220,000.00 220,000.00 edit link
2 kran set unit 1.0000 82,500.00 82,500.00 delete kran
2 Semen kg 6.0000 1,175.00 7,050.00
3 Pasir pasang m3 - 160,000.00 -
4 Perlengkapan % - - -
UPAH
1 Pekerja Or Hr 1.2000 80,000.00 96,000.00
2 Tukang Or Hr 1.4500 100,000.00 145,000.00
3 Kepala Tukang Or Hr 0.1500 110,000.00 16,500.00
4 Mandor Or Hr 0.0600 120,000.00 7,200.00
1 2 3 4 5 6
BAHAN
1 Kran air unit 1.0000 20,000.00 20,000.00
2 Sealtipe bh 0.0250 12,800.00 320.00
UPAH
1 Pekerja Or Hr 0.0100 80,000.00 800.00
2 Tukang Or Hr 0.4000 100,000.00 40,000.00
3 Kepala Tukang Or Hr 0.0400 110,000.00 4,400.00
4 Mandor Or Hr 0.0050 120,000.00 600.00
1 2 3 4 5 6
BAHAN
1 Kitchen sink unit 1.0000 328,240.00 328,240.00
2 Kran Leher Angsa unit 1.0000 197,600.00 197,600.00
3 Sealtipe bh 0.0250 12,800.00 320.00
UPAH
1 Pekerja Or Hr 0.0100 80,000.00 800.00
2 Tukang Or Hr 0.4000 100,000.00 40,000.00
3 Kepala Tukang Or Hr 0.0400 110,000.00 4,400.00
4 Mandor Or Hr 0.0050 120,000.00 600.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 18.2600 120,741.50 2,204,739.79
2 Selimar aluminium m' 21.0400 150,991.50 3,176,861.16
3 Kaca polos t=5 mm m2 3.6920 114,450.60 422,547.04
4 Kaca temperd t=8 mm m2 2.1960 171,562.60 376,751.47
5 Sealent kusen & dinding m' 10.1900 5,000.00 50,950.00
6 Engsel pintu bh 6.0000 25,000.00 150,000.00
7 Engsel jendela bh 8.0000 25,000.00 200,000.00
8 Hak angin bh 8.0000 50,000.00 400,000.00
9 Handle pintu set 2.0000 200,000.00 400,000.00
10 Pengunci set 1.0000 150,000.00 150,000.00
11 Grendel jendela bh 1.0000 50,000.00 50,000.00
12 Grendel pintu atas set 1.0000 50,000.00 50,000.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 14.8600 120,741.50 1,794,218.69
2 Selimar aluminium m' 23.0400 150,991.50 3,478,844.16
3 Kaca polos t=5 mm m2 1.2715 114,450.60 145,523.94
4 Kaca Tempered 8 mm m2 2.1476 171,562.60 368,447.84
5 Sealent kusen & dinding m' 8.7600 5,000.00 43,800.00
6 Engsel pintu bh 6.0000 25,000.00 150,000.00
7 Engsel jendela bh 8.0000 25,000.00 200,000.00
8 Hak angin bh 8.0000 50,000.00 400,000.00
9 Handle pintu set 2.0000 200,000.00 400,000.00
10 Pengunci set 1.0000 150,000.00 150,000.00
11 Grendel jendela bh 4.0000 50,000.00 200,000.00
12 Grendel pintu atas set 1.0000 50,000.00 50,000.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 14.0140 120,741.50 1,692,071.38
2 Selimar aluminium m' 8.8000 150,991.50 1,328,725.20
3 Kaca polos t=5 mm m2 3.5831 114,450.60 410,087.94
4 Sealent kusen & dinding m' 7.6140 5,000.00 38,070.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Engsel jendela bh 2.0000 25,000.00 50,000.00
7 Hak angin bh 2.0000 50,000.00 100,000.00
8 Handle pintu set 1.0000 200,000.00 200,000.00
9 Pengunci set 1.0000 150,000.00 150,000.00
10 Grendel jendela bh 2.0000 50,000.00 100,000.00
11 Grendel pintu atas set - 50,000.00 -
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 7.0000 120,741.50 845,190.50
2 Daun pintu enggineering door uk.0.82x2.1 unit 1.0000 1,600,000.00 1,600,000.00
3 Selimar aluminium m' - 150,991.50 -
4 Kaca polos t=5 mm m2 0.3948 114,450.60 45,185.10
5 Sealent kusen & dinding m' 6.0000 5,000.00 30,000.00
6 Engsel pintu bh 3.0000 25,000.00 75,000.00
7 Handle pintu + pengunci set 1.0000 200,000.00 200,000.00
8 Engsel jendela bh - 25,000.00 -
9 Hak angin bh - 50,000.00 -
10 Grendel jendela bh - 50,000.00 -
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 6.8000 120,741.50 821,042.20
2 Daun pintu enggineering door uk.0.82x2.1 unit 1.0000 1,280,000.00 1,280,000.00
3 Selimar aluminium m' - 150,991.50 -
4 Kaca polos t=5 mm m2 0.3948 114,450.60 45,185.10
5 Sealent kusen & dinding m' 5.9000 5,000.00 29,500.00
6 Engsel pintu bh 3.0000 25,000.00 75,000.00
7 Handle pintu + pengunci set 1.0000 200,000.00 200,000.00
8 Engsel jendela bh - 25,000.00 -
9 Hak angin bh - 50,000.00 -
10 Grendel jendela bh - 50,000.00 -
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 7.0000 120,741.50 845,190.50
2 Selimar aluminium m' 8.6000 150,991.50 1,298,526.90
3 Kaca polos t=5 mm m2 1.5168 114,450.60 173,598.67
4 Sealent kusen & dinding m' 6.0000 5,000.00 30,000.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Handle pintu + pengunci set 1.0000 200,000.00 200,000.00
7 Engsel jendela bh 2.0000 25,000.00 50,000.00
8 Hak angin bh 2.0000 50,000.00 100,000.00
9 Grendel jendela bh 1.0000 50,000.00 50,000.00
1 2 3 4 5 6 7.848
BAHAN
1 Pintu Besi kg 24.6225 14,000.00 344,714.99
2 Handle Besi & pengunci bh 1.0000 280,000.00 280,000.00
3 Engsel Besi bh 3.0000 25,000.00 75,000.00
4 Kusen Besi hollow 60.60 kg 18.3333 14,000.00 256,666.67
5 Plat besi utk louvre kg 1.4910 14,200.00 21,172.73
6 Cat Duco kg 0.2500 22,000.00 5,500.00
7 Cat Duco kg 0.9500 41,600.00 39,520.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
Jumlah 1,190,095.81
Overhead + Profit (10%) 10% x D 119,009.58
Dibulatkan 1,309,105.39
Jenis Pekerjaan : Pintu type PD
Acuan :
1 2 3 4 5 6 7.848
BAHAN
1 Pintu Besi kg 23.2790 14,000.00 325,906.17
2 Handle Besi & pengunci bh 1.0000 280,000.00 280,000.00
3 Engsel Besi bh 3.0000 68,000.00 204,000.00
4 Kusen Besi hollow 60.60 kg 18.6267 14,000.00 260,773.33
6 Plat besi utk louvre kg 1.2963 14,200.00 18,407.23
6 Cat Duco kg 0.2500 22,000.00 5,500.00
6 Cat Duco kg 0.9500 41,600.00 39,520.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
Jumlah 1,301,628.17
Overhead + Profit (10%) 10% x D 130,162.82
Dibulatkan 1,431,790.98
Jenis Pekerjaan : Pintu UPVC type PT
Acuan :
1 2 3 4 5 6
BAHAN
1 Pintu UPVC Lengkap unit 1.0000 845,600.00 845,600.00
UPAH
1 Pemasangan Pintu unit 1.0000 253,680.00 253,680.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 5.3600 120,741.50 647,174.44
2 Daun pintu Alumunium unit 1.0000 1,000,000.00 1,000,000.00
3 Sealent kusen & dinding m' 10.7200 5,000.00 53,600.00
4 Engsel pintu bh 3.0000 25,000.00 75,000.00
5 Handle pintu + pengunci set 1.0000 280,000.00 280,000.00
1 2 3 4 5 6
BAHAN
1 Pintu Besi kg 47.5813 14,000.00 666,138.85
2 Handle Besi & pengunci bh 2.0000 280,000.00 560,000.00
3 Engsel Besi bh 6.0000 68,000.00 408,000.00
4 Kusen Besi hollow 60.60 kg 20.8633 14,000.00 292,086.67
6 Plat besi utk louvre kg 1.0888 14,200.00 15,461.66
6 Cat Duco kg 0.5000 22,000.00 11,000.00
6 Cat Duco kg 1.9000 41,600.00 79,040.00
UPAH PASANG
1 Tukang Las Oh 1.7486 100,000.00 174,857.14
2 Kepala Tukang Oh 0.8329 110,000.00 91,614.29
3 Mandor Oh 0.5714 120,000.00 68,571.43
Jumlah 2,366,770.04
Overhead & profit 10% 236,677.00
Dibulatkan 2,603,447.04
Jenis Pekerjaan : Pintu type PS
Acuan :
1 2 3 4 5 6
BAHAN
1 Kusen aluminium m' 5.0200 120,741.50 606,122.33
2 Selimar aluminium bh 4.7100 150,991.50 711,169.97
3 Plat Aluminium m2 0.9865 140,000.00 138,103.00
4 Sealent kusen & dinding m' 10.0400 5,000.00 50,200.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Handle pintu, satu sisi set 1.0000 280,000.00 280,000.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 9.3600 120,741.50 1,130,140.44
2 Selimar aluminium m' 9.6000 150,991.50 1,449,518.40
3 Kaca polos t=5 mm m2 1.5476 114,450.60 177,123.75
4 Sealent kusen & dinding m' 12.4800 5,000.00 62,400.00
5 Engsel jendela bh 8.0000 25,000.00 200,000.00
6 Hak angin bh 8.0000 50,000.00 400,000.00
7 Grendel jendela bh 4.0000 50,000.00 200,000.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 5.5900 120,741.50 674,944.99
2 Selimar aluminium m' 4.8000 150,991.50 724,759.20
3 Kaca polos t=5 mm m2 0.7738 114,450.60 88,561.87
4 Sealent kusen & dinding m' 9.7200 5,000.00 48,600.00
5 Engsel jendela bh 4.0000 25,000.00 100,000.00
6 Hak angin bh 4.0000 50,000.00 200,000.00
7 Grendel jendela bh 2.0000 50,000.00 100,000.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 11.4200 120,741.50 1,378,867.93
2 Selimar aluminium m' 4.1200 150,991.50 622,084.98
3 Kaca polos t=5 mm m2 1.3946 114,450.60 159,612.81
4 Sealent kusen & dinding m' 9.9600 5,000.00 49,800.00
5 Engsel jendela bh 2.0000 25,000.00 50,000.00
6 Hak angin bh 2.0000 50,000.00 100,000.00
7 Grendel jendela bh 2.0000 50,000.00 100,000.00
1 2 3 4 5 6
BAHAN
1 Roster bh 14.0000 6,900.00 96,600.00
2 glassblock bh 14.0000 36,000.00 504,000.00
3 Benangan m' 4.6000 19,742.25 90,814.35
1 2 3 4 5 6
BAHAN
1 Roster bh 6.0000 6,900.00 41,400.00
2 glassblock bh 3.0000 36,000.00 108,000.00
3 Benangan m' 2.4000 19,742.25 47,381.40
1 2 3 4 5 6
BAHAN
1 Roster bh 28.0000 6,900.00 193,200.00
2 Benangan m' 7.2000 19,742.25 142,144.20
1 2 3 4 5 6
BAHAN
1 Roster bh 8.0000 6,900.00 55,200.00
2 glassblock bh 8.0000 36,000.00 288,000.00
3 Benangan m' 3.2000 19,742.25 63,175.20
1 2 3 4 5 6
BAHAN
1 Roster bh 18.0000 6,900.00 124,200.00
2 glassblock bh 9.0000 9,900.00 89,100.00
3 Benangan m' 7.2000 19,742.25 142,144.20
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 1.9600 120,741.50 236,653.34
2 Kaca polos t=5 mm m2 0.2100 114,450.60 24,034.63
3 Sealent kusen & dinding m' 3.9200 5,000.00 19,600.00
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 3.4400 120,741.50 415,350.76
2 Kaca polos t=5 mm m2 0.4200 114,450.60 48,069.25
3 Sealent kusen & dinding m' 6.0800 5,000.00 30,400.00
1 2 3 4 5 6
BAHAN
1 Besi Hollow 40x40 cm m' 10.0000 14,000.00 140,000.00
2 Besi Hollow 40x20 cm m' 7.1500 12,000.00 85,800.00
3 Cat Meni Kg 0.1500 22,000.00 3,300.00
4 Cat Minyak Kg 0.2500 41,600.00 10,400.00
UPAH PASANG
1 Tukang Las Oh 0.4371 100,000.00 43,714.29
2 Kepala Tukang Oh 0.2082 110,000.00 22,903.57
4 Mandor Oh 0.1429 120,000.00 17,142.86
1 2 3 4 5 6
BAHAN
1 Besi Hollow 40x40 cm m' 35.7000 14,000.00 499,800.00
3 Cat Meni Kg 0.1750 22,000.00 3,850.00
4 Cat Minyak Kg 0.2750 41,600.00 11,440.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
1 2 3 4 5 6
BAHAN
1 Besi Hollow 40x40 cm m' 18.9600 14,000.00 265,440.00
3 Cat Meni Kg 0.1250 22,000.00 2,750.00
4 Cat Minyak Kg 0.2250 41,600.00 9,360.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
1 2 3 4 5 6
BAHAN
1 Plat Besi 3mm kg 43.7100 14,000.00 611,940.00
2 Kawat las kg 0.0450 55,000.00 2,475.00
3 Cat Duco doff kg 0.8000 41,600.00 33,280.00
4 Baut 12 cm bh 6.0000 2,700.00 16,200.00
5 Material Bantu (amplas, dempul, las, dll) ls 1.0000 132,779.00 132,779.00
6 Alat Bantu pasang di atas bangunan ls 1.0000 119,501.10 119,501.10
UPAH
1 Pekerja Or Hr 2.1100 80,000.00 168,800.00
2 Tukang Las Or Hr 3.8990 100,000.00 389,900.00
3 Kepala Tukang Or Hr 2.0000 110,000.00 220,000.00
4 Mandor Or Hr 2.0000 120,000.00 240,000.00
Harga Satuan Pekerjaan 1,934,875.10
Overhead & profit 10% 193,487.51
Dibulatkan 2,128,362.61
Jenis Pekerjaan : Railling pipa Black Steel dia 2,5"
:
1 2 3 4 5 6
BAHAN
1 Pipa black steel 2,5" m' 1.0500 78,513.33 82,439.00 ###
2 Las Ls 1.0000 49,463.40 49,463.40
UPAH -
1 Pekerja Or Hr 0.0720 80,000.00 5,760.00
2 Tukang Besi Or Hr 0.0180 100,000.00 1,800.00
3 Tukang Las Or Hr 0.0180 100,000.00 1,800.00
4 Mandor Or Hr 0.0071 120,000.00 852.00
Harga Satuan Pekerjaan 142,114.39
Overhead & profit 10% 14,211.44
Dibulatkan 156,325.83
Jenis Pekerjaan : 1 Unit Pas. besi BS railling ramp difable dia. 2", 3/4" dan 1" finish cat.
:
1 2 3 4 5 6
BAHAN
1 Pipa Black steel 3" m' 10.9800 161,666.66 1,775,099.93
2 Pipa Black steel 2" m' 10.0200 65,000.00 651,300.00
3 Pipa Black steel 1" m' 27.7200 50,000.00 1,386,000.00
4 Tiang Hand Railling (Hollow) m' 9.0000 500,000.00 4,500,000.00 ###
5 Las Ls 1.0000 290,934.00 290,934.00
UPAH
1 Pekerja Or Hr 0.0720 80,000.00 5,760.00
2 Tukang Besi Or Hr 0.0180 100,000.00 1,800.00
3 Tukang Las Or Hr 0.0180 100,000.00 1,800.00
4 Mandor Or Hr 0.0071 120,000.00 852.00
Harga Satuan Pekerjaan 8,613,545.92
Overhead & profit 10% 861,354.59
Dibulatkan 9,474,900.52
1 buah papan nama pekerjaan menggunkan multiflex 18 mm, frame besi siku dan tiang kayu 8/12
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
Pekerja OH 1.0000 80,000.00 80,000.00
Tukang Kayu OH 1.0000 100,000.00 100,000.00
Kepala Tukang Kayu OH 0.1000 110,000.00 11,000.00
Tukang Cat dan Tulis L.01 OH 1.5000 100,000.00 150,000.00
Mandor L.04 OH 0.1000 120,000.00 12,000.00
JUMLAH TENAGA KERJA 353,000.00
B BAHAN
multipleks tebal 18mm lbr 0.3500 200,000.00 70,000.00
tinggi tiang kayu 8/12 kelas II, tinggi 4 meter m3 0.0770 1,000,000.00 77,000.00
frame besi kg 5.8000 14,000.00 81,200.00
Paku campuran kg 1.2500 15,000.00 18,750.00
cat kayu kg 2.5000 41,600.00 104,000.00
JUMLAH HARGA BAHAN 350,950.00
C PERALATAN
-
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 80,000 40,000.00
Tukang Kayu L.02.04 OH 0.5000 100,000 50,000.00
Kepala tukang L.03.01 OH 0.0500 110,000 5,500.00
Mandor L.04.01 OH 0.0013 120,000 156.00
JUMLAH TENAGA KERJA 95,656.00
B BAHAN
Paving block 8 cm natural M2 1.01 84,000 84,840.00
Pasir beton M3 0.07 160,000 11,200.00
JUMLAH HARGA BAHAN 96,040.00
C PERALATAN
Peralatan Kerja Paving Blok % 0.1000 96,040 9,604.00
JUMLAH HARGA ALAT 9,604.00
D Jumlah (A+B+C) 201,300.00
E Overhead & Profit 10% 10% 20,130.00
F Harga Satuan Pekerjaan (D+E) 221,430.00
A.4.1.1.19 Pemasangan 100 kg jaring kawat baja (wiremesh)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2500 80,000 20,000.00
Tukang Besi L.02 OH 0.2500 100,000 25,000.00
Kepala Tukang L.03 OH 0.0250 110,000 2,750.00
Mandor L.04 OH 0.0250 120,000 3,000.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN
Wire mesh kg 102.0000 11,000 1,122,000.00
Kawat beton kg 0.5000 20,000 10,000.00
JUMLAH HARGA BAHAN 1,132,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,182,750.00
E Overhead & Profit 10% 10% 118,275.00
F Harga Satuan Pekerjaan (D+E) 1,301,025.00
1Kg Besi 13,010.25
A.4.1.1.1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 1.6500 80,000.00 132,000.00
Tukang Batu L.02 OH 0.2750 100,000.00 27,500.00
Kepala Tukang L.03 OH 0.0280 110,000.00 3,080.00
Mandor L.04 OH 0.0830 120,000.00 9,960.00
JUMLAH TENAGA KERJA 172,540.00
B BAHAN
Semen portland/PC kg 247.0000 1,175.00 290,225.00
Pasir Beton/PB kg 869.0000 185.71 161,381.99
Kerikil (Maks 30 mm)/KR kg 999.0000 118.52 118,400.00
Air Liter 215.0000 250.00 53,750.00
JUMLAH HARGA BAHAN 623,756.99
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 796,296.99
E Overhead & Profit 10% 10% 79,629.70
F Harga Satuan Pekerjaan (D+E) 875,926.00
A.4.1.1.1 Kanstein UK. 8.40.20
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2000 80,000 16,000.00
Tukang Batu L.02 OH 0.1500 100,000 15,000.00
Kepala Tukang L.03 OH 0.0150 110,000 1,650.00
Mandor L.04 OH 0.0080 120,000 960.00
JUMLAH TENAGA KERJA 33,610.00
B BAHAN
Kanstein m' 2.5000 21,600 54,000.00
Spesi Sambungan kg 1.8900 1,175 2,220.75
Adukan Alas (Floor) m2 0.0100 60,793 607.93
JUMLAH HARGA BAHAN 56,828.68
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 90,438.68
E Overhead & Profit 10% 10% 9,043.87
F Harga Satuan Pekerjaan (D+E) 99,482.00
Menggunakan Molen K-300 Jumla
h
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
(Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.3230 80,000.00 ###
2 Tukang Batu L.02 OH 0.1890 100,000.00 ###
3 Kepala Tukang L.03 OH 0.0190 110,000.00 ###
4 Mandor L.04 OH 0.1320 120,000.00 ###
Jumlah Harga Tenaga Kerja ###
B. Bahan
1 PC / Portland Cement M.15 kg 413.0000
8.2600 58,750.00 ###
2 PB / Pasir Beton M.14.a kg 681.0000
m3 0.4422 160,000.00 ###
3 Kr / Kerikil M.12 kg 1,021.0000
m3 0.5834 160,000.00 ###
4 Air M.02 L 215.0000
m3 0.2150 25,000.00 ###
Jumlah Harga Bahan ###
C. Peralatan
1 Molen E.28.b Sewa-hari 0.2500 200,000.00 ###
Jumlah Harga Peralatan ###
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) ###
E. Overhead + Profit (10%) 10% x D ###
F. Harga Satuan Pekerjaan per-m2 (D+E) ###
1 m3 beton mutu f'c = 31.2 Mpa (K300) menggunakan ready mixed dan bahan aditif Jumla
h
Harga Satuan
No. Uraian Kode Satuan Koefisien
(Rp)
(Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000 80,000 ###
2 Tukang Batu L.02 OH 0.250 100,000 ###
3 Kepala Tukang L.03 OH 0.025 110,000 ###
4 Mandor L.04 OH 0.100 120,000 ###
Jumlah Harga Tenaga Kerja ###
B. Bahan
1 Campuran Beton Ready Mixed M.09.x m 2
1.00 932,164.00 ###
Jumlah Harga Bahan ###
C. Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.120 0.00
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) ###
E. Overhead + Profit (10%) 10% x D ###
F. Harga Satuan Pekerjaan per-m2 (D+E) ###
A.4.1.1.1 Buis Beton Dia. 30 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2000 80,000 16,000.00
Mandor L.04 OH 0.0200 120,000 2,400.00
JUMLAH TENAGA KERJA 18,400.00
B BAHAN
Buis Beton Dia. 30 cm m' 1.0000 32,000 32,000.00
Spesi Sambungan kg 0.3800 1,175 446.50
JUMLAH HARGA BAHAN 32,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 50,400.00
E Overhead & Profit 10% 10% 5,040.00
F Harga Satuan Pekerjaan (D+E) 55,440.00
A.4.1.1.1 Gorong-gorong dia. 60 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2000 80,000 16,000.00
Mandor L.04 OH 0.0200 120,000 2,400.00
JUMLAH TENAGA KERJA 18,400.00
B BAHAN
Gorong-gorong dia. 60 cm m' 1.0000 92,000 92,000.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.3000 80,000.00 24,000.00
2 Tukang Batu L.02 OH 0.3000 100,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.1000 110,000.00 11,000.00
4 Mandor L.04 OH 0.0150 120,000.00 1,800.00
66,800.00
B BAHAN
1 Plat Strip 3 x 30 x 6 M M 3.0000 2,366.67 7,100.00
2 Besi Siku 40.40.4 M 2.6000 36,250.00 94,250.00
101,350.00
C PERALATAN
-
D Jumlah (A+B+C) 168,150.00
E Overhead & Profit 10% x D 16,815.00
F Harga Satuan Pekerjaan (D+E) 184,965.00
Waterproofing (membrane) T=3 mm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.5000 80,000.00 40,000.00
2 Mandor L.02 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 40,600.00
B BAHAN
1 Material Primer bitumen kg 0.3000 68,000.00 20,400.00
2 Water proofing (membrane) t= 3 mm Roll 1.0500 125,000.00 131,250.00
3 Alat Bantu Ls 1.0000 11,373.75 11,373.75
JUMLAH HARGA BAHAN 163,023.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 203,623.75
E Overhead & Profit (Contoh 15%) 10% x D 20,362.38
F Harga Satuan Pekerjaan (D+E) 223,986.13
BARAK PANJANG
Jenis Pekerjaan : Pintu type PJ1
Acuan :
1 2 3 4 5 6
BAHAN
1 Kusen UPVC m1 16.5000 121,000.00 1,996,500.00
2 Frame m1 24.3800 121,000.00 2,949,980.00
3 Kaca polos t=6 mm m2 8.2700 114,450.60 946,506.46
4 Sealent kusen & dinding m' 9.4700 5,000.00 47,350.00
5 Engsel pintu bh 6.0000 25,000.00 150,000.00
6 Engsel jendela bh 12.0000 25,000.00 300,000.00
7 Hak angin bh 6.0000 50,000.00 300,000.00
8 Handle pintu set 2.0000 200,000.00 400,000.00
9 Pengunci set 1.0000 150,000.00 150,000.00
10 Grendel jendela bh 6.0000 50,000.00 300,000.00
11 Grendel pintu atas set 1.0000 50,000.00 50,000.00
12 Sanblas m2 8.2700 15,000.00 124,050.00
13 Door Stoper bh 2.0000 65,000.00 130,000.00
1 2 3 4 5 6
BAHAN
1 Kusen UPVC m1 6.0000 121,000.00 726,000.00
2 Frame m1 6.1080 121,000.00 739,068.00
3 Kaca polos t=6 mm m2 2.3441 114,450.60 268,281.36
4 Sealent kusen & dinding m' 6.0000 5,000.00 30,000.00
5 Engsel pintu bh 3.0000 25,000.00 75,000.00
6 Handle pintu set 1.0000 200,000.00 200,000.00
7 Pengunci set 1.0000 150,000.00 150,000.00
8 Sanblas m2 2.3441 15,000.00 35,161.20
9 Door Stoper bh 1.0000 65,000.00 65,000.00
1 2 3 4 5 6
BAHAN
1 Pintu UPVC Lengkap unit 1.0000 845,600.00 845,600.00
UPAH
1 Pemasangan Pintu unit 1.0000 295,960.00 295,960.00
1 2 3 4 5 6
BAHAN
1 Kusen UPVC m' 3.5000 121,000.00 423,500.00
2 Daun pintu UPVC bh 1.0000 1,500,000.00 1,500,000.00
3 Sealent kusen & dinding m' 3.6600 5,000.00 18,300.00
4 Engsel pintu bh 3.0000 25,000.00 75,000.00
5 Handle pintu + pengunci set 1.0000 350,000.00 350,000.00
1 2 3 4 5 6
BAHAN
1 Kusen UPVC m' 13.6200 121,000.00 1,648,020.00
2 Selimar UPVC DAUN JENDELA m' 12.5440 121,000.00 1,517,824.00
3 Casement bh 8.0000 50,000.00 400,000.00
4 Handel casement bh 4.0000 42,350.00 169,400.00
5 Kaca bening t=6 mm m2 2.4358 114,450.60 278,774.19
6 Sealent kusen & dinding m' 6.8800 5,000.00 34,400.00
7 Engsel jendela bh 8.0000 25,000.00 200,000.00
1 2 3 4 5 6
BAHAN
1 Kusen UPVC m' 13.6200 120,741.50 1,644,499.23
2 Selimar UPVC m' 4.0600 150,991.50 613,025.49
3 Kaca bening t=6 mm m2 1.8865 114,450.60 215,913.35
4 Sealent kusen & dinding m' 6.8800 5,000.00 34,400.00
5 Engsel jendela bh 4.0000 25,000.00 100,000.00
6 Casemen bh 4.0000 50,000.00 200,000.00
7 Handel Casemen bh 2.0000 42,350.00 84,700.00
1 2 3 4 5 6
BAHAN
1 Glass Block m2 0.3600 1,051,400.00 378,504.00
2 Roster m2 0.2400 333,600.00 80,064.00
1 2 3 4 5 6
BAHAN
1 Glass Block bh 25.0000 36,000.00 900,000.00
2 Semen kg 12.8000 1,175.00 15,040.00
3 Pasir Pasang m3 0.0350 160,000.00 5,600.00
UPAH
1 Pekerja Or Hr 0.3000 80,000.00 24,000.00
2 Tukang Or Hr 0.1000 100,000.00 10,000.00
3 Kepala Tukang Or Hr 0.0100 110,000.00 1,100.00
4 Mandor Or Hr 0.0010 120,000.00 120.00
Harga Satuan Pekerjaan 955,860.00
Overhead & profit 10% 1,051,446.00
Dibulatkan 1,051,400.00
Jenis Pekerjaan : Railling type R2
Acuan :
1 2 3 4 5 6
BAHAN
1 Railling hollow 4/4 & 2/4 m2 2.7060 403,200.00 1,091,059.20
1 2 3 4 5 6
BAHAN
1 Railling hollow 4/4 & 2/4 m2 1.2760 403,200.00 514,483.20
1 2 3 4 5 6
BAHAN
1 Glass Block m2 0.8000 1,051,400.00 841,120.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.0500 80,000 84,000.00
Tukang besi L.02 OH 0.3780 100,000 37,800.00
Kepala tukang L.03 OH 0.0378 110,000 4,158.00
Mandor L.04 OH 0.0019 120,000 224.64
JUMLAH TENAGA KERJA 126,182.64
B BAHAN
Kusen rangka UNP 100x50x5x7.5 kg 37.4400 14,000.00 524,160.00
Daun Pintu Baja T=1,5 mm kg 104.1667 14,000.00 1,458,333.33
Rangka pintu besi siku 40x40x2 kg 22.6967 14,000.00 317,753.33
Level handle pintu baja psg 1.0000 144,000.00 144,000.00
HD non panic swing bh 1.0000 428,000.00 428,000.00
D. cylinder bh 1.0000 100,000.00 100,000.00
Engsel/hinges psg 1.5000 73,600.00 110,400.00
Cat Meni besi m2 8.0960 23,608.00 191,130.37
JUMLAH HARGA BAHAN 3,273,777.03
C PERALATAN
Alat 2 % 5.000 163,688.85
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 3,563,648.53
E Overhead + Profit (Contoh 15%) 10% x D 10% 356,364.85
F Harga Satuan Pekerjaan (D+E) 3,920,100.00
Jenis Pekerjaan : Pkerjaan GRC Panel Motif t= 5 cm /m2
Acuan :
1 2 3 4 5 6
BAHAN
1 Serat Fiber kg 0.0600 36,000.00 2,160.00
2 Semen kg 3.6000 1,175.00 4,230.00
3 agregat halus m3 0.2400 240,000.00 57,600.00
4 Molding m2 1.0000 191,970.00 191,970.00
Bahan Lainnya ls 1.0000 38,394.00 38,394.00
UPAH
1 Pekerja Or Hr 1.5000 80,000.00 120,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0150 110,000.00 1,650.00
4 Mandor Or Hr 0.0015 120,000.00 180.00
PERALATAN
Alat 2 % 0.0500 14,717.70 735.89
1 2 3 4 5 6
BAHAN
1 GRC Panel Motif m2 1.7500 1,051,400.00 1,839,950.00
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.1000 80,000.00 88,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 251,500.00
B BAHAN
Glass block 20 x 20 mm bh 3.0000 36,000.00 108,000.00
Roster 20 x 20 bh 6.0000 9,900.00 59,400.00
Taliair m' 2.4000 21,260.63 51,025.50
JUMLAH HARGA BAHAN 218,425.50
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 469,925.50
Overhead & profit 10% 46,992.55
Dibulatkan 516,918.05
Glassblock 20 x 20, Type RB4
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Glass block 20 x 20 mm bh 8.0000 36,000.00 288,000.00
Roster 20 x 20 bh 8.0000 9,900.00 79,200.00
Taliair m' 3.2000 21,260.63 68,034.00
JUMLAH HARGA BAHAN 435,234.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 718,734.00
Overhead & profit 10% 71,873.40
Dibulatkan 790,607.40
Glassblock 20 x 20, Type RB5
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.6000 80,000.00 128,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 291,500.00
B BAHAN
Glass block 20 x 20 mm bh 6.0000 36,000.00 216,000.00
Roster 20 x 20 bh 3.0000 9,900.00 29,700.00
Taliair m' 2.4000 21,260.63 51,025.50
JUMLAH HARGA BAHAN 296,725.50
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Glass block 20 x 20 mm bh - 36,000.00 -
Roster 20 x 20 bh 20.0000 9,900.00 198,000.00
Taliair m' 6.0000 21,260.63 127,563.75
JUMLAH HARGA BAHAN 325,563.75
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 609,063.75
Overhead & profit 10% 60,906.38
Dibulatkan 669,970.13
Roster 20 x 20, Type RB7
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 16.0000 9,900.00 158,400.00
JUMLAH HARGA BAHAN 158,400.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 90.0000 9,900.00 891,000.00
JUMLAH HARGA BAHAN 891,000.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 1,174,500.00
Overhead & profit 10% 117,450.00
Dibulatkan 1,291,950.00
Roster 20 x 20, Type RS3
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 70.0000 9,900.00 693,000.00
JUMLAH HARGA BAHAN 693,000.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 976,500.00
Overhead & profit 10% 97,650.00
Dibulatkan 1,074,150.00
Roster 20 x 20, Tidak Ada di datail Lokasi Roof
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 1.5000 80,000.00 120,000.00
Tukang batu L.02 OH 0.7500 100,000.00 75,000.00
Kepala tukang L.03 OH 0.7500 110,000.00 82,500.00
Mandor L.04 OH 0.0500 120,000.00 6,000.00
JUMLAH TENAGA KERJA 283,500.00
B BAHAN
Roster 20 x 20 bh 20.0000 9,900.00 198,000.00
JUMLAH HARGA BAHAN 198,000.00
C PERALATAN
Alat bantu ls 1.0000 -
JUMLAH HARGA ALAT -
Harga Satuan Pekerjaan 481,500.00
Overhead & profit 10% 48,150.00
Dibulatkan 529,650.00
Pasang Railing TYPE R (uk. 0,815m x t.1,1m), by specialist
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6
BAHAN
1 Besi siku L Kg 15.0000 36,250.00 543,750.00
2 Besi plat baja Kg 32.8000 36,250.00 1,189,000.00
3 Kawat las Kg 0.0500 55,000.00 2,750.00
UPAH
1 Tukang Las Oh 0.2000 100,000.00 20,000.00
2 Kepala Tukang Oh 0.0200 110,000.00 2,200.00
3 Mandor Oh 0.0010 120,000.00 120.00
Jumlah 1,757,820.00
Dibulatkan 1,757,820.00
Jenis Pekerjaan : 1 unit pintu Besi / PB 7, ukuran 82 cm x 2,1m
1 2 3 4 5 6
BAHAN
1 Pintu Besi m2 1.6680 1,757,820.00 2,932,043.76
2 Handle Besi & pengunci bh 2.0000 280,000.00 560,000.00
3 Engsel Besi bh 3.0000 68,000.00 204,000.00
4 Kusen Besi hollow 60.60 kg 19.4712 36,250.00 705,831.00
6 Plat besi utk louvre kg 4.4160 36,250.00 160,080.00
7 Cat Duco kg 0.9500 41,600.00 39,520.00
UPAH PASANG
1 Tukang Las Oh 0.8743 100,000.00 87,428.57
2 Kepala Tukang Oh 0.4164 110,000.00 45,807.14
4 Mandor Oh 0.2857 120,000.00 34,285.71
Harga Satuan Pekerjaan 4,768,996.19
Overhead & profit 10% 476,899.62
Dibulatkan 5,245,895.81
Jenis Pekerjaan : 1 M1 Talang Air Zincalum t= 0,35mm
1 2 3 4 5 6
A UPAH
1 Pekerja Oh 0.2000 80,000.00 16,000.00
2 Tukang Talang Oh 0.0200 100,000.00 2,000.00
2 Kepala Tukang Oh 0.0020 110,000.00 220.00
3 Mandor Oh 0.0002 120,000.00 24.00
JUMLAH UAPAH 18,244.00
B BAHAN
1 Plat Talang Zincalum t= 0,35 mm m 1.1000 49,600.00 54,560.00
2 Besi plat baja 2mm Kg 1.1513 36,250.00 41,735.83
JUMLAH BAHAN 96,295.83
C PERALATAN
Alat bantu ls 0.0500 9,629.58 481.48
JUMLAH HARGA ALAT 481.48
Harga Satuan Pekerjaan 115,021.31
Overhead & profit 10% 11,502.13
Dibulatkan 126,523.44
1 2 3 4 5 6
BAHAN
1 Atap Transparant lebar 0,78m m' 1.3000 223,728.81 290,847.45
2 Skrup + roof seal utk UPVC Roofing buah 4.0000 320.00 1,280.00
UPAH
1 Pekerja Or Hr 0.1500 80,000.00 12,000.00
2 Tukang Or Hr 0.1500 100,000.00 15,000.00
3 Kepala Tukang Or Hr 0.0800 110,000.00 8,800.00
4 Mandor Or Hr 0.0060 120,000.00 720.00
1 2 3 4 5 6
A UPAH
1 Pekerja Oh 0.1500 80,000.00 12,000.00
2 Tukang Talang Oh 0.1500 100,000.00 15,000.00
2 Kepala Tukang Oh 0.0800 110,000.00 8,800.00
3 Mandor Oh 0.0060 120,000.00 720.00
JUMLAH UAPAH 36,520.00
B BAHAN
1 Atap Transparant lebar 0,78m m' 1.3000 223,728.81 290,847.45
2 Skrup + roof seal utk UPVC Roofing buah 4.0000 320.00 1,280.00
JUMLAH BAHAN 292,127.45
C PERALATAN
Alat bantu ls 0.0500 14,606.37 730.32
JUMLAH HARGA ALAT 730.32
A TENAGA
Pekerja OH 1.00 80,000 80,000.00
Tukang Kayu OH 1.00 100,000 100,000.00
Kepala Tukang Kayu OH 0.10 110,000 11,000.00
Tukang Cat dan Tulis OH 1.50 100,000 150,000.00
Mandor OH 0.10 120,000 12,000.00
JUMLAH TENAGA KERJA 353,000.00
B BAHAN
multipleks tebal 18mm lbr 66.25 200,000 13,250,000.00
Ensel bh 120.00 25,000 3,000,000.00
Kunci bh 60.00 4,000 240,000.00
Paku campuran kg 3.25 14,000 45,500.00
cat kayu kg 4.50 41,600 187,200.00
JUMLAH HARGA BAHAN 16,722,700.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 17,075,700.00
E Overhead & Profit (Contoh 15 %) 10% x D 1,707,570.00
F Harga Satuan Pekerjaan (D+E) 18,783,270.00
Jenis Pekerjaan : Pek. Nama Ruangan 10x20 cm (acrylic)
Acuan : Modifikasi
1 2 3 4 5 6
A UPAH
1 Tukang Talang Oh 0.1500 100,000.00 15,000.00
JUMLAH UPAH 15,000.00
B BAHAN
1 ACRYLIC 3 MM – 4 x 8 BENING M2 0.0200 421,920.00 8,438.40
2 Cat Ls 1.0000 20,000.00 20,000.00
3 Lakban Kertas bh 1.0000 12,000.00 12,000.00
4 Pen acrylic bh 2.0000 3,200.00 6,400.00
JUMLAH BAHAN 46,838.40
C PERALATAN
Alat bantu ls 0.0500 2,341.92 117.10
JUMLAH HARGA ALAT 117.10
1 2 3 4 5 6
A UPAH
1 Tukang Talang Oh 0.1500 100,000.00 15,000.00
JUMLAH UPAH 15,000.00
B BAHAN
1 ACRYLIC 3 MM – 4 x 8 BENING M2 0.0900 421,920.00 37,972.80
2 Cat Ls 1.0000 20,000.00 20,000.00
3 Lakban Kertas Ls 1.0000 12,000.00 12,000.00
4 Pen acrylic bh 4.0000 3,200.00 12,800.00
JUMLAH BAHAN 82,772.80
C PERALATAN
Alat bantu ls 0.0500 4,138.64 206.93
JUMLAH HARGA ALAT 206.93
Harga Satuan Pekerjaan 97,979.73
Overhead & profit 10% 9,797.97
Dibulatkan 107,777.71
Jenis Pekerjaan : Pek. Papan Informasi Denah Bangunan 60x120 cm (acrylic)
Acuan : Modifikasi
1 2 3 4 5 6
A UPAH
1 Tukang Talang Oh 0.1500 100,000.00 15,000
JUMLAH UPAH 15,000.00
B BAHAN
1 ACRYLIC 3 MM – 4 x 8 BENING M2 0.7200 421,920 303,782
2 Cat Ls 1.0000 20,000 20,000
3 Lakban Kertas Ls 1.0000 12,000 12,000
4 Pen acrylic bh 6.0000 3,200 19,200
JUMLAH BAHAN 354,982
C PERALATAN
Alat bantu ls 0.0500 17,749 887
JUMLAH HARGA ALAT 887
Harga Satuan Pekerjaan 370,870
Overhead & profit 10% 37,086.99
Dibulatkan 407,956.84
1 2 3 4 5 6
BAHAN
1 Bata ringan tebal 10 cm bh 8.4 7,200 60,480
2 Mortar siap pakai Kg 3.15 1,800 5,670
UPAH
1 Pekerja OH 0.3 80,000 24,000
2 Tukang Batu OH 0.1 100,000 10,000
3 Kepala Tukang OH 0.01 110,000 1,100
4 Mandor OH 0.01 120,000 1,200
Harga Satuan Pekerjaan 102,450
Overhead & profit 10% 112,695
Dibulatkan 112,600
0.0324
30.8641975309
plester
tambahan Analisa
plesteran
Jenis Pekerjaan : Membuat 1 m' Kolom 12x25+ perapihan
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.1.1.35
1 2 3 4 5 6
BAHAN
1 Kayu klas III m3 0.002 1,000,000 2,000
Paku 5-12 cm kg 0.01 15,000 150
Besi beton polos kg 5.4915 11,000 60,407
Kawat beton kg 0.45 20,000 9,000
Semen Portland kg 9.92 1,175 11,656
Pasir beton m3 0.019 160,000 3,040
Kerikil m3 0.023 160,000 3,680
-
UPAH -
1 Pekerja OH 0.18 80,000 14,400
2 Tukang Batu OH 0.02 100,000 2,000
3 Tukang kayu OH 0.02 100,000 2,000
4 Tukang besi OH 0.02 100,000 2,000
5 Kepala Tukang OH 0.006 110,000 660
6 Mandor OH 0.009 120,000 1,080
Harga Satuan Pekerjaan 112,073
Overhead & profit 10% 123,280
Dibulatkan 123,200
Jenis Pekerjaan : Membuat 1 m' Kolom 15x15
UPAH
1 Pekerja OH 0.18 80,000 14,400
2 Tukang Batu OH 0.02 100,000 2,000
3 Tukang kayu OH 0.02 100,000 2,000
4 Tukang besi OH 0.02 100,000 2,000
5 Kepala Tukang OH 0.006 110,000 660
6 Mandor OH 0.009 120,000 1,080
Harga Satuan Pekerjaan 95,390
Overhead & profit 10% 104,929
Dibulatkan 104,900
14.4
oke, Konsinyasi
oke, Konsinyasi
6.25
konsinyasi 19 Okt
konsinyasi 19 Okt
6.25
konsinyasi 19 Okt
Jenis Pekerjaan : memasang 1 m2 lantai keramik TACTILE ukuran ( 40 x 40 ) cm
Acuan : Permen PUPR No. 28 2016 AHSP Cipta Karya A.4.4.3.8
1 2 3 4 5 6
BAHAN
1 keramik tactile bh 12.0000 14,400.00 172,800.00
2 Semen PC kg 10.0000 1,175.00 11,750.00
3 Pasir Pasang m3 0.0450 160,000.00 7,200.00
4 semen warna kg 0.5000 10,000.00 5,000.00
UPAH
1 Pekerja OH 0.7000 80,000.00 56,000.00
2 Tukang batu OH 0.3500 100,000.00 35,000.00
3 Kepala Tukang OH 0.0350 110,000.00 3,850.00
4 Mandor OH 0.0350 120,000.00 4,200.00
Harga Satuan Peke 295,800.00
Overhead & profit 29,580.00
Dibulatkan 325,380.00
25
25
Jenis Pekerjaan : Pemasangan 1 m1 Drop Ceiling, gypsumboard t=9 mm (20m & 15cm)
Acuan : TAMBAHAN ANALISA
1 2 3 4 5 6
BAHAN
1 Gypsumboard lbr 0.118 58,520 6,881
2 Paku skrup Kg 0.1 15,000 1,500
UPAH
1 Pekerja Or Hr 0.035 80,000 2,800
2 Tukang Kayu Or Hr 0.0175 100,000 1,750
3 Kepala Tukang Kayu Or Hr 0.175 110,000 19,250
4 Mandor Or Hr 0.175 120,000 21,000
Jenis Pekerjaan : 1 M1 Pasang Drop Ceiling Gypsum Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan : TAMBAHAN ANALISA
1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.20.2 mm m' 2.875 12,000 34,500
1 2 3 4 5 6
BAHAN
1 Rangka furing channel m' 2.4 11,389 27,334 11,389.34
2 Rangka metal furing m' 2.4 13,168.75 31,605 13,168.75
2 Assc ls 30%x rangka 58,939 17,682
UPAH
1 Pekerja Or Hr 0.175 80,000 14,000 34,505
2 Tukang besi Or Hr 0.175 100,000 17,500
3 Kepala Tukang Or Hr 0.0175 110,000 1,925 ganti koefisien
4 Mandor Or Hr 0.009 120,000 1,080
1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 9.765 14,000 136,710
2 Paku skrup Kg 0.225 14,000 3,150
UPAH
1 Pekerja Or Hr 0.35 80,000 28,000
2 Tukang besi Or Hr 0.35 100,000 35,000
3 Kepala Tukang Or Hr 0.035 110,000 3,850
4 Mandor Or Hr 0.018 120,000 2,160
1 2 3 4 5 6
BAHAN
1 sement Aci kg 3.25 1,400 4,550
2 Kg 0.11 - -
UPAH
1 Pekerja Or Hr 0.1 80,000 8,000
2 Tukang Kayu Or Hr 0.05 100,000 5,000
3 Kepala Tukang Kayu Or Hr 0.005 110,000 550
4 Mandor Or Hr 0.005 120,000 600
Jenis Pekerjaan : 1 M2 Pasang Drop Ceiling Rangka besi hollow 1x40.40.2 mm (60 x 60) cm
Acuan :
1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 9.765 14,000 136,710
2 Paku skrup Kg 0.225 14,000 3,150
UPAH
1 Pekerja Or Hr 0.35 80,000 28,000
2 Tukang besi Or Hr 0.35 100,000 35,000
3 Kepala Tukang Or Hr 0.035 110,000 3,850
4 Mandor Or Hr 0.018 120,000 2,160
1 2 3 4 5 6
BAHAN
1 Rangka metal hollow 40.40.2 mm m' 5.628 14,000 78,792
2 Paku skrup Kg 0.15 14,000 2,100
UPAH
1 Pekerja Or Hr 0.175 80,000 14,000
2 Tukang besi Or Hr 0.175 100,000 17,500
3 Kepala Tukang Or Hr 0.0175 110,000 1,925
4 Mandor Or Hr 0.009 120,000 1,080
1 2 3 4 5 6
BAHAN
1 Genteng metal berpasir m2 1 128,000 128,000
2 Skrup buah 9 750 6,750
3 Insulasi powder m2 6,000 -
UPAH
1 Pekerja Or Hr 0.15 80,000 12,000
2 Tukang Or Hr 0.15 100,000 15,000
3 Kepala Tukang Or Hr 0.08 110,000 8,800
4 Mandor Or Hr 0.006 120,000 720
1 2 3 4 5 6
BAHAN
1 grc bord 4mm lbr 0.364 60,000 21,840
2
3 Paku skrup Kg 0.2 14,000 2,800
UPAH
1 Pekerja Or Hr 0.1 80,000 8,000
2 Tukang Kayu Or Hr 0.05 100,000 5,000
3 Kepala Tukang Kayu Or Hr 0.005 110,000 550
4 Mandor Or Hr 0.005 120,000 600
tambahan analisa
tambahan analisa
Pemasangan shower
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 80,000 800.00
2 Tukang batu L.02 OH 0.100 100,000 10,000.00
3 Kepala tukang L.03 OH 0.010 110,000 1,100.00
4 Mandor L.04 OH 0.005 120,000 600.00
JUMLAH TENAGA KERJA 12,500.00
B BAHAN
1 Kran Shower Unit 1.000 226,400.00 226,400.00
2 Seal tape Bh 0.025 12,800.00 320.00
JUMLAH HARGA BAHAN 226,720.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 239,220.00
E Overhead & Profit (Contoh 10%) 10% x D 23,922.00
F Harga Satuan Pekerjaan (D+E) 263,142.00
edit link
delete kran
1 2 3 4 5 6
BAHAN
1 Tisu Holder unit 1 355,000 355,000
UPAH
1 Pekerja Or Hr 0.01 80,000 800
2 Tukang Or Hr 0.4 100,000 40,000
3 Kepala Tukang Or Hr 0.04 110,000 4,400
4 Mandor Or Hr 0.005 120,000 600
1 2 3 4 5 6
BAHAN
1 Kran Shower unit 1 250,000 250,000
2 Sealtipe bh 0.025 12,800 320
UPAH
1 Pekerja Or Hr 0.01 80,000 800
2 Tukang Or Hr 0.4 100,000 40,000
3 Kepala Tukang Or Hr 0.04 110,000 4,400
4 Mandor Or Hr 0.005 120,000 600
1 2 3 4 5 6
BAHAN
1 Kusen aluminium 3" m' 7.12 120,742 859,679
2 Daun pintu enggineering door uk.0.82x2.1 unit 1 1,600,000 1,600,000
3 Selimar aluminium m' 0 150,992 -
4 Kaca polos t=5 mm m2 0.39 114,451 45,185
5 Sealent kusen & dinding m' 6 5,000 30,000
6 Engsel pintu bh 3 25,000 75,000
7 Handle pintu + pengunci set 1 200,000 200,000
8 Engsel jendela bh 0 25,000 -
9 Hak angin bh 0 50,000 -
10 Grendel jendela bh 0 50,000 -
1 2 3 4 5 6
BAHAN
2 Pipa GIP 3" m' 1.0500 91,740.00 96,327.00
3 Las Ls 1.0000 49,463.40 49,463.40
UPAH -
1 Pekerja Or Hr 0.0720 80,000.00 5,760.00
2 Tukang Besi Or Hr 0.0180 100,000.00 1,800.00
3 Tukang Las Or Hr 0.0180 100,000.00 1,800.00
4 Mandor Or Hr 0.0071 120,000.00 852.00
Harga Satuan Peke 156,002.40
Overhead & profit 15,600.24
Dibulatkan 171,602.64
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 80,000 40,000.00
Tukang Kayu L.02.04 OH 0.5000 100,000 50,000.00
Kepala tukang L.03.01 OH 0.0500 110,000 5,500.00
Mandor L.04.01 OH 0.0013 120,000 156.00
JUMLAH TENAGA KERJA 95,656.00
B BAHAN
Grass block M2 1.01 68,000 68,680.00
Pasir beton M3 0.07 160,000 11,200.00
JUMLAH HARGA BAHAN 79,880.00
C PERALATAN
Peralatan Kerja % 0.1000 96,040 9,604.00
JUMLAH HARGA ALAT 9,604.00
D Jumlah (A+B+C) 185,140.00
E Overhead & Profit 10% 10% 18,514.00
F Harga Satuan Pekerjaan (D+E) 203,654.00
1.130 2.5
2.5
0.065 2.3
0.735 2.3
0.200 3.45
2.130 4 8.520 3.45
16.5
0.880
0.880
0.585
0.585
2.930 2 5.860
0.37
0.37
0.88
0.88
2.5 4 10
24.380
2.5
2.5
1.7
1.7
2.77
2.77
13.94
Jenis Pekerjaan : Pintu UPVC type PT
Acuan :
1 2 3 4 5 6
BAHAN
1 Pintu UPVC Lengkap unit 1 845,600.00 845,600.00
UPAH
1 Pemasangan Pintu unit 1 295,960.00 295,960.00
1 2 3 4 5 6
BAHAN
1 Roster bh 25 9,900 247,500
2 Semen kg 12.8 1,175 15,040
3 Pasir Pasang m3 0.035 160,000 5,600
UPAH
1 Pekerja Or Hr 0.3 80,000 24,000
2 Tukang Or Hr 0.1 100,000 10,000
3 Kepala Tukang Or Hr 0.01 110,000 1,100
4 Mandor Or Hr 0.001 120,000 120
Harga Satuan Peke 303,360
Overhead & profit 333,696
Dibulatkan 333,600
Pekerjaan Tali air
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A TENAGA KERJA
Pekerja L.01 OH 0.075 80,000 6,000.00
Tukang batu L.02 OH 0.056 100,000 5,625.00
Kepala tukang L.03 OH 0.056 110,000 6,187.50
Mandor L.04 OH 0.006 120,000 675.00
JUMLAH TENAGA KERJA 18,487.50
A PERALATAN
T.01. 1 m2 tebas tebang berupa memotong dan membersihkan lokasi dari tanaman/tumbuhan diameter < 15 cm
b. Galian Pasir untuk pondasi bangunan dengan kedalaman > 3 m, Tambahan Koefisien setiap penambahan kedalaman 1 m
a. secara manual
1. Mengangkut 1 m3 galian dengan jarak angkut > 3m s.d < 5 m
Manual
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.500 80,000.00 120,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.022 110,000.00 2,420.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 159,880.00
B. Bahan
1 PC / Portland Cement M.15 kg 247
zak 4.94 58,750.00 290,225.00
2 PB / Pasir Beton M.14.a m3 0.621 160,000.00 99,360.00
3 Kr / Kerikil M.12 m3 0.740 160,000.00 118,400.00
4 Air M.02 L 200 25.00 5,000.00
B.12 1 m3 beton mutu f'c = 31.2 Mpa (K350) Kedap Air, Slump (12+2) cm, w/c = 0.48
Manual
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 2.100 80,000.00 168,000.00
2 Tukang Batu L.02 OH 0.350 100,000.00 35,000.00
3 Kepala Tukang L.03 OH 0.035 110,000.00 3,850.00
4 Mandor L.04 OH 0.210 120,000.00 25,200.00
Jumlah Harga Tenaga Kerja 232,050.00
B. Bahan
1 PC / Portland Cement M.15 kg 448
zak 11.20 58,750.00 658,000.00
2 PB / Pasir Beton M.14.a kg 667
m 3
0.476 160,000.00 76,228.57
3 Kr / Kerikil M.12 kg 1,000
m 3
0.741 160,000.00 118,518.52
4 Air M.02 L 1,000
m 3
1.000 25.00 25.00
Jumlah Harga Bahan 852,772.09
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,084,822.09
E. Overhead + Profit (10%) 10% x D 108,482.21
F. Harga Satuan Pekerjaan per-m2 (D+E) 1,193,304.30
B.12 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
Menggunakan Molen
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 80,000.00 132,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 172,540.00
B. Bahan
1 PC / Portland Cement M.15 kg 413
zak 10.33 58,750.00 606,593.75
2 PB / Pasir Beton M.14.a kg 681
m 3
0.486 160,000.00 77,828.57
3 Kr / Kerikil M.12 kg 1,021
m 3
0.756 160,000.00 121,007.41
4 Air M.02 L 215
m 3
0.215 25,000.00 5,375.00
Jumlah Harga Bahan 810,804.73
C. Peralatan
1 Molen E.28.b Sewa-hari 0.250 250,000.00 62,500.00
Jumlah Harga Peralatan 62,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,045,844.73
E. Overhead + Profit (10%) 10% x D 104,584.47
F. Harga Satuan Pekerjaan per-m (D+E)
2
1,150,429.20
Menggunakan Molen k-275
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 80,000.00 132,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 172,540.00
B. Bahan
1 PC / Portland Cement M.15 kg 406
zak 10.15 58,750.00 596,312.50
2 PB / Pasir Beton M.14.a kg 684
m 3
0.489 160,000.00 78,171.43
3 Kr / Kerikil M.12 kg 1,026
m 3
0.760 160,000.00 121,600.00
4 Air M.02 L 215
m 3
0.215 25,000.00 5,375.00
Jumlah Harga Bahan 801,458.93
C. Peralatan
1 Molen E.28.b Sewa-hari 0.250 250,000.00 62,500.00
Jumlah Harga Peralatan 62,500.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,036,498.93
E. Overhead + Profit (10%) 10% x D 103,649.89
F. Harga Satuan Pekerjaan per-m (D+E)
2
1,140,148.82
1 m3 beton mutu f'c = 31.2 Mpa (K350) menggunakan ready mixed dan bahan aditif
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.250 100,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.025 110,000.00 2,750.00
4 Mandor L.04 OH 0.100 120,000.00 12,000.00
Jumlah Harga Tenaga Kerja 119,750.00
B. Bahan
1 Campuran Beton Ready Mixed M.09.x m2 1.02 1,150,429.20 1,173,437.79
Jumlah Harga Bahan 1,173,437.79
C. Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.120 250,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,323,187.79
E. Overhead + Profit (10%) 10% x D 132,318.78
F. Harga Satuan Pekerjaan per-m (D+E)
2
1,455,506.56
1 m3 beton mutu f'c = 23 Mpa (K275) menggunakan ready mixed dan bahan aditif
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.000 80,000.00 80,000.00
2 Tukang Batu L.02 OH 0.250 100,000.00 25,000.00
3 Kepala Tukang L.03 OH 0.025 110,000.00 2,750.00
4 Mandor L.04 OH 0.100 120,000.00 12,000.00
Jumlah Harga Tenaga Kerja 119,750.00
B. Bahan
1 Campuran Beton Ready Mixed M.09.x m2 1.02 1,140,148.82 1,162,951.80
Jumlah Harga Bahan 1,162,951.80
C. Peralatan
1 Pompa dan conveyor beton E.35 Sewa-hari 0.120 250,000.00 30,000.00
Jumlah Harga Peralatan 30,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 1,312,701.80
E. Overhead + Profit (10%) 10% x D 131,270.18
F. Harga Satuan Pekerjaan per-m2 (D+E) 1,443,971.98
1 m3 beton mutu f'c = 25 Mpa (K300) menggunakan ready mixed dan bahan aditif
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.000 80,000.00 0.00
2 Tukang Batu L.02 OH 0.000 100,000.00 0.00
3 Kepala Tukang L.03 OH 0.000 110,000.00 0.00
4 Mandor L.04 OH 0.000 120,000.00 0.00
Jumlah Harga Tenaga Kerja 0.00
B. Bahan
1 Beton Ready Mix K-300 M.09.x m2 1.02 870,000 887,400
a.Manual (kenaikan 4 m)
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.100 100,000.00 10,000.00
3 Mandor L.04 OH 0.030 120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 37,600.00
B. Bahan
Jumlah Harga Bahan 0.00
C. Peralatan
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 37,600.00
E. Overhead + Profit (10%) 10% x D 3,760.00
F. Harga Satuan Pekerjaan per-m2 (D+E) 41,360.00
PER-KG 413.60
B.34 Bekisting Pondasi dan Sloof Beton Biasa dengan papan ukuran 3/20 cm
B.36 Bongkar 1 m2 bekisting secara Hati - hati (untuk beton expose dan/atau pemanfaatan kembali bekisting)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.052 80,000.00 4,160.00
2 Tukang L.02 OH 0.010 100,000.00 1,040.00
3 Mandor L.04 OH 0.005 120,000.00 624.00
4 Operator Crane L.05 OH 0.010 120,000.00 1,248.00
5 Pembantu Operator L.06 OH 0.010 100,000.00 1,040.00
Jumlah Harga Tenaga Kerja 8,112.00
B. Bahan
1 Tiang Pancang Beton Tulang 25X25 cm M.18.c m' 1.030 116,000.00 119,480.00
Jumlah Harga Bahan 119,480.00
C. Peralatan
1 Crane 5 - 10 ton E.07.b sewa-jam 0.073 300,000.00 21,840.00
2 Alat Pancang + Hammer 2 ton E.01.d sewa-jam 0.073 100,000.00 7,280.00
3 Alat Penyambung Tiang Pancang E.02.a bh 0.250 100,000.00 25,000.00
Jumlah Harga Peralatan 54,120.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 181,712.00
E. Overhead & Profit 10% x D 18,171.20
199,883.20
F. Harga Satuan Pekerjaan per-m' (D+E) 199,000.00
F.13 Bekisting Pondasi dan Sloof Beton Biasa dengan batako, spesi 1:5
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.300 80,000.00 24,000.00 cek koefisiann
Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 36,900.00
B BAHAN
batako kuning (putih/tras) Bh 12.500 1,500.00 18,750.00
Semen Portlan zak 0.194 58,750.00 11,374.00
Pasir Pasang m3 0.045 160,000.00 7,200.00
JUMLAH HARGA BAHAN 37,324.00
C PERALATAN
Alat Bantu 0.005 74,224.00 371.12
JUMLAH HARGA ALAT 371.12
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH - 80,000.00 -
Tukang L.02 OH 0.34 100,000.00 34,000.00
Kepala Tukang L.03 OH 0.034 110,000.00 3,740.00
Mandor L.04 OH 0.034 120,000.00 4,080.00
JUMLAH TENAGA KERJA 41,820.00
B BAHAN
Profil Galvalum m 5 14,000 70,000.00
Profil Reng baja ringan m 3 6,000 18,000.00
Dinabolt buah 0.5 1,600 800.00
Sekrup fixer buah 40 750 30,000.00
Alumunium foil 1 sisi m2 1 6,000 6,000.00
JUMLAH HARGA BAHAN 124,800.00
C PERALATAN
Alat Bantu - - -
JUMLAH HARGA ALAT -
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 1.500 80,000.00 120,000.00
Tukang L.02 OH 0.75 100,000.00 75,000.00
Kepala Tukang L.03 OH 0.075 110,000.00 8,250.00
Mandor L.04 OH 0.075 120,000.00 9,000.00
JUMLAH TENAGA KERJA 212,250.00
B BAHAN
Batu belah m3 1.2 180,000.00 216,000.00
Semen portland Zak 4.04 58,750.00 237,350.00
Pasir Pasang m3 0.485 160,000.00 77,600.00
JUMLAH HARGA BAHAN 530,950.00
C PERALATAN
Alat Bantu - - -
JUMLAH HARGA ALAT -
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Besi WF kg 1.15 14,000.00 16,100.00
JUMLAH HARGA BAHAN 16,100.00
C PERALATAN
Alat Bantu ls 1.000 805.00 805.00
JUMLAH HARGA ALAT 805.00
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang L.02 OH 2.3333 100,000.00 233,333.33
Kepala Tukang L.03 OH 0.2333 110,000.00 25,666.67
Mandor L.04 OH 0.1167 120,000.00 14,000.00
JUMLAH TENAGA KERJA 833,000.00
B BAHAN
SIKAGROUT kg 77 Rp 3,120.00 240,240.00
JUMLAH HARGA BAHAN 240,240.00
C PERALATAN
Alat Bantu 0.050 12,012.00 600.60
JUMLAH HARGA ALAT 600.60
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Tukang kayu L.02 OH 0.340 100,000.00 34,000.00
2 Kepala Tukang L.03 OH 0.034 110,000.00 3,740.00
3 Mandor L.04 OH 0.034 120,000.00 4,080.00
41,820.00
B BAHAN
Baja ringan C 75.75 m 4.000 14,000.00 56,000.00 https://hargabeton.com/harga-baja-ringan/
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 36,900.00
B BAHAN
1 Batu bata Bh 140.00 700.00 98,000.00
2 Semen PC 50 kg Kg 14.370 1,175.00 16,884.75
3 Pasir Pasang m3 0.040 160,000.00 6,400.00
121,284.75
C PERALATAN
-
D Jumlah (A+B+C) 158,184.75
E Overhead & Profit 10% x D 15,818.48
F Harga Satuan Pekerjaan (D+E) 174,003.23
A.4.1.1Pemasangan 100 kg jaring kawat baja (wiremesh)
No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 OH 0.2500 80,000 20,000.00
Tukang Besi L.02 OH 0.2500 100,000 25,000.00
Kepala Tukang L.03 OH 0.0250 110,000 2,750.00
Mandor L.04 OH 0.0250 120,000 3,000.00
JUMLAH TENAGA KERJA 50,750.00
B BAHAN
Wire mesh kg 102.0000 11,000 1,122,000.00
Kawat beton kg 0.5000 20,000 10,000.00
JUMLAH HARGA BAHAN 1,132,000.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,182,750.00
E Overhead & Profit 10% 118,275.00
F Harga Satuan Pekerjaan (D+E) 1,301,025.00
1Kg Besi 13,010.00
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Baja IWF kg 1.150 14,000.00 16,100.00
Menie Cat Besi kg 0.030 22,000.00 660.00
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 7.0000 80,000.00 560,000.00
Tukang L.02 OH 2.3333 100,000.00 233,333.33
Kepala Tukang L.03 OH 0.2333 110,000.00 25,666.67
Mandor L.04 OH 0.1167 120,000.00 14,000.00
JUMLAH TENAGA KERJA 833,000.00
B BAHAN
SIKAGROUT SAK 77 78,000.00 6,006,000.00
JUMLAH HARGA BAHAN 6,006,000.00
C PERALATAN
Alat Bantu 0.050 300,300.00 15,015.00
JUMLAH HARGA ALAT 15,015.00
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Tukang kayu L.02 OH 0.340 100,000.00 34,000.00
2 Kepala Tukang L.03 OH 0.034 110,000.00 3,740.00
3 Mandor L.04 OH 0.034 120,000.00 4,080.00
41,820.00
B BAHAN
Baja ringan C 75.75 m 4.000 14,000.00 56,000.00 https://hargabeton.com/harga-baja-ringan/
Roof Bottom/Reng R 33-0.45 m' 5.000 6,000.00 30,000.00 https://hargabeton.com/harga-baja-ringan/
Self drilling screw dia 6 x 20 mm (truss Screw) bh 45.00 320.00 14,400.00
Dynabol dia 12 x 120 mm bh 0.700 1,600.00 1,120.00
Alumunium Foil DS m2 1.200 -
101,520.00
C PERALATAN
-
A. 4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3PP
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Batu L.02 OH 0.100 100,000.00 10,000.00
3 Kepala Tukang L.03 OH 0.010 110,000.00 1,100.00
4 Mandor L.04 OH 0.015 120,000.00 1,800.00
JUMLAH TENAGA KERJA 36,900.00
B BAHAN
1 Batu bata Bh 140.00 600.00 84,000.00
2 Semen PC 50 kg Kg 14.370 1,175.00 16,884.75
3 Pasir Pasang m3 0.040 160,000.00 6,400.00
107,284.75
C PERALATAN
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 144,184.75
E Overhead & Profit 10% x D 14,418.48
F Harga Satuan Pekerjaan (D+E) 158,603.23
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.540 80,000.00 43,200.00
2 Tukang Gali Tanah L.02 OH 0.300 100,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.210 110,000.00 23,100.00
4 Mandor L.04 OH 0.250 120,000.00 30,000.00
JUMLAH TENAGA KERJA 126,300.00
B BAHAN
C PERALATAN
alat bor D60 cm jam 0.600 180,000.00 108,000.00
108,000.00
-
D Jumlah (A+B+C) 234,300.00
E Overhead & Profit 10% x D 23,430.00
F Harga Satuan Pekerjaan (D+E) 257,730.00
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.540 80,000.00 43,200.00
2 Tukang Gali Tanah L.02 OH 0.350 100,000.00 35,000.00
3 Kepala Tukang L.03 OH 0.210 110,000.00 23,100.00
4 Mandor L.04 OH 0.250 120,000.00 30,000.00
JUMLAH TENAGA KERJA 131,300.00
B BAHAN
C PERALATAN
SEWA alat bor D80 cm m' 0.700 260,000.00 182,000.00
182,000.00
-
D Jumlah (A+B+C) 313,300.00
E Overhead & Profit 10% x D 31,330.00
F Harga Satuan Pekerjaan (D+E) 344,630.00
per m'Pengeboran Tanah Diameter 100 cm
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
1 Pekerja L.01 OH 0.740 80,000.00 59,200.00
2 Tukang Gali Tanah L.02 OH 0.500 100,000.00 50,000.00
3 Kepala Tukang L.03 OH 0.430 110,000.00 47,300.00
4 Mandor L.04 OH 0.500 120,000.00 60,000.00
JUMLAH TENAGA KERJA 216,500.00
B BAHAN
C PERALATAN
alat bor D100 cm m' 0.700 440,000.00 308,000.00
308,000.00
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 524,500.00
E Overhead & Profit 10% x D 52,450.00
F Harga Satuan Pekerjaan (D+E) 576,950.00
e. Timbunan Tanah di datangkan
1.500
0.275
0.022
0.083
BERAT JENIS
bj pasir 1400 kg/m3
bj pasir 1600 kg/m3 0.476428571428571 #REF! #REF!
bj split 1350 kg/m3 0.740740740740741 #REF! #REF!
bj air 1000 kg/m3
Menggunakan Molen k-175
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 1.650 80,000.00 132,000.00
2 Tukang Batu L.02 OH 0.275 100,000.00 27,500.00
3 Kepala Tukang L.03 OH 0.028 110,000.00 3,080.00
4 Mandor L.04 OH 0.083 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 172,540.00
B. Bahan
1 PC / Portland Cement M.15 kg 326 1,468.75 478,812.50
zak 8.15 58,750.00
2 PB / Pasir Beton M.14.a kg 760
m3 0.543 160,000.00 86,857.14
3 Kr / Kerikil M.12 kg 1,029
m 3
0.762 160,000.00 121,955.56
4 Air M.02 L 215
m 3
0.215 25,000.00 5,375.00
Jumlah Harga Bahan 693,000.20
C. Peralatan
1 Molen E.28.b Sewa-hari 0.250 0.00 0.00
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 865,540.20
E. Overhead + Profit (10%) 10% x D 86,554.02
F. Harga Satuan Pekerjaan per-m (D+E)
2
952,094.22
1 m3 beton mutu f'c = 14,5 Mpa (K175) menggunakan beton manual
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.648 80,000.00 51,840.00
2 Tukang Batu L.02 OH 0.108 100,000.00 10,800.00
3 Kepala Tukang L.03 OH 0.054 110,000.00 5,940.00
4 Mandor L.04 OH 0.027 120,000.00 3,240.00
Jumlah Harga Tenaga Kerja 71,820.00
B. Bahan
1 Campuran Beton Manual K175 M.09.x m2 1.02 952,094 971,136
6,623
Pek. M2 Rangka Atap Besi Pipa + reng Baja CNP 100.50.20.3,2+ zink
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.300 80,000.00 24,000.00
2 Tukang Besi L.02 OH 0.300 100,000.00 30,000.00
3 Kepala Tukang L.03 OH 0.030 110,000.00 3,300.00
4 Mandor L.04 OH 0.030 120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 60,900.00
B. Bahan
1 Pipa Galvanis M.54.d kg 8.69 18,963.83 164,795.68
2 Baja CNP M.54.c kg 16.50 14,000.00 231,000.00
3 Kawat Las M.62 kg 0.25 55,000.00 13,750.00
4 Mur baut dan ring M.56.e bh 2.00 3,052.00 6,104.00
5 Cat dasar & Finishing ls 1.00 20,000.00 20,000.00
Jumlah Harga Bahan 435,649.68
C. Peralatan 1 Ls 1.000 25,000.00 25,000.00
Jumlah Harga Peralatan 25,000.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 521,549.68
E. Overhead + Profit (10%) 10% x D 52,154.97
F. Harga Satuan Pekerjaan per-m2 (D+E) 573,704.65
PER-KG 5,737.05
B.27 Bekisting Balok Dengan Multipleks 9mm
Harga Satuan Jumlah
No. Uraian Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7
A. Tenaga Kerja
1 Pekerja L.01 OH 0.660 80,000.00 52,800.00
2 Tukang Kayu L.02 OH 0.330 100,000.00 33,000.00
3 Kepala Tukang L.03 OH 0.033 110,000.00 3,630.00
4 Mandor L.04 OH 0.033 120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 93,390.00
B. Bahan
1 Multipleks 9mm M.37.b m3 0.3500 125,000.00 43,750.00
2 Kayu kelas III M.65.b m3 0.058 1,000,000.00 58,000.00
2 Paku 5 cm dan 7 cm M.65.b kg 0.400 15,000.00 6,000.00
3 Minyak bekisting M.65.b lt 0.100 9,000.00 900.00
4 Dolken Kayu Galam diameter 8 - 10 cm / 4 m btg 2.00 10,000.00 20,000.00
Jumlah Harga Bahan 128,650.00
C. Peralatan pemakaian 3x 42,883.33
Jumlah Harga Peralatan 0.00
D. Jumlah Harga Tenaga, Bahan dan Peralatan (A+B+C) 136,273.33
E. Overhead + Profit (10%) 10% x D 13,627.33
F. Harga Satuan Pekerjaan per-m2 (D+E) 149,900.67
0.06
B.29 Bekisting plat lantai m2
A TENAGA
Pekerja L.01.01 OH 0.6600
Tukang Kayu L.02.04 OH 0.3300
Kepala Tukang L.03.01 OH 0.0330
Mandor L.04.01 OH 0.0330
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.0400
Paku 5 - 12 cm kg 0.4000
Minyak bekisting Liter 0.2000
Balok kayu kelas II m3 0.0150
Plywood 9 mm Lbr 0.3500
Dolken kayu Ø 8-10/400 cm Batang 2.0000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E)
Bongkar beton Bertulang 1m3
A TENAGA
1 Tukang kayu L.02 OH 0.088 100,000.00 8,800.00 7,457
2 Kepala Tukang L.03 OH 0.008 110,000.00 880.00
3 Mandor L.04 OH 0.001 120,000.00 120.00
JUMLAH TENAGA KERJA 9,800.00
B BAHAN
Baja ringan C 75.75 m 2.000 14,000.00 28,000.00
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.1000 80,000.00 8,000.00
Tukang L.02 OH 0.1000 100,000.00 10,000.00
Kepala Tukang L.03 OH 0.0010 110,000.00 110.00
Mandor L.04 OH 0.0050 120,000.00 600.00
JUMLAH TENAGA KERJA 18,710.00
B BAHAN
Solar ltr 1.0000 6560 6,560.00
Minyak Pelumas ltr 0.1000 30000 3,000.00
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Pipa Baja kg 1.150 14,000.00 16,100.00
Menie Cat Besi kg 0.030 22,000.00 660.00
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Besi WF kg 1.15 14,000.00 16,100.00
Menie Cat Besi ls 0.02 22,000.00 440.00
JUMLAH HARGA BAHAN 16,540.00
C PERALATAN
Alat Bantu ls 1.000 827.00 827.00
JUMLAH HARGA ALAT 827.00
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Pipa Medium Galvanis 2,50" kg 1.150 16,896.55 19,431.03
Menie Cat Besi kg 0.020 22,000.00 440.00
Jumlah Harga
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)
A TENAGA
Pekerja L.01 OH 0.0600 80,000.00 4,800.00
Tukang L.02 OH 0.0600 100,000.00 6,000.00
Kepala Tukang L.03 OH 0.0060 110,000.00 660.00
Mandor L.04 OH 0.0030 120,000.00 360.00
JUMLAH TENAGA KERJA 11,820.00
B BAHAN
Pipa Medium Galvanis 3" kg 1.150 18,963.83 21,808.40
Menie Cat Besi 0.020 22,000.00 440.00
kg 0.030 - -
JUMLAH HARGA BAHAN 22,248.40
C PERALATAN
Alat Bantu ls 1.000 1,112.42 1,112.42
Sewa Mesin las jam 0.25 - -
JUMLAH HARGA ALAT 1,112.42
Memasang 1 bh Indoor Hydran Box (IHB) Type A2, termasuk fire hose 1,5"x30 m c/w coupling machino
jet nozzel, hydran valve 1,5" dan 2,5", dan hose rack
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh IHB @ Rp. 1,799,600.00 = Rp 1,799,600.00
10.000 % Perlengkapan = Rp 179,960.00
Sub total : = Rp 1,979,560.00
Upah An. SNI ( Revisi ) 6.32.2
0.250 Oh Pekerja @ Rp. 80,000.00 = Rp 20,000.00
0.250 Oh Tukang @ Rp. 110,000.00 = Rp 27,500.00
0.040 Oh Kepala tukang @ Rp. 80,000.00 = Rp 3,200.00
0.040 Oh Mandor @ Rp. 120,000.00 = Rp 4,800.00
Sub total : = Rp 55,500.00
Lain-lain K3 + CAR = Rp 6,105.18
Memasang 1 bh Grille
Bahan An. SNI ( Revisi ) 6.33.1
1.000 bh Grille 200x200 mm @ Rp. 100,000.00 = Rp 100,000.00
10.000 % Perlengkapan = Rp 10,000.00
Sub total : = Rp 110,000.00
Upah An. SNI ( Revisi ) 6.32.2
0.150 Oh Pekerja @ Rp. 80,000.00 = Rp 12,000.00
0.150 Oh Tukang @ Rp. 110,000.00 = Rp 16,500.00
0.020 Oh Kepala tukang @ Rp. 80,000.00 = Rp 1,600.00
0.020 Oh Mandor @ Rp. 120,000.00 = Rp 2,400.00
Sub total : = Rp 32,500.00
Lain-lain K3 + CAR = Rp 427.50
Memasang Splitter TV
Bahan An. SNI ( Revisi ) 6.16.1
1.000 bh Splitter 6 port @ Rp. 49,934.40 = Rp 49,934.40
5.000 % Perlengkapan instalasi = Rp 2,496.72
Sub total : = Rp 52,431.12
Upah An. SNI ( Revisi ) 6.16.2
0.025 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 2,000.00
0.025 Oh Tukang listrik @ Rp. 100,000.00 = Rp 2,500.00
0.017 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 1,826.00
0.014 Oh Mandor @ Rp. 120,000.00 = Rp 1,680.00
Sub total : = Rp 8,006.00
Lain-lain K3 + CAR = Rp 181.31
Memasang GENSET
Bahan An. SNI ( Revisi ) 6.37.1
1.000 bh Genset-25 kVA @ Rp. 107,879,110.00 = Rp 107,879,110.00
5.000 % Perlengkapan instalasi = Rp 5,393,955.50
Sub total : = Rp 113,273,065.50
Upah An. SNI ( Revisi ) 6.37.2
0.166 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 13,280.00
0.166 Oh Tukang listrik @ Rp. 100,000.00 = Rp 16,600.00
0.033 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 3,630.00
0.017 Oh Mandor @ Rp. 120,000.00 = Rp 1,992.00
Sub total : = Rp 35,502.00
Total upah+bahan : = Rp 113,308,567.50
Memasang Lampu Exit-18 W c/w Battery Charger
Bahan An. SNI ( Revisi ) 6.35.1
1.000 bh Lampu Exit-18w @ Rp. 290,000.00 = Rp 290,000.00
5.000 % Perlengkapan instalasi = Rp 14,500.00
Sub total : = Rp 304,500.00
Upah An. SNI ( Revisi ) 6.35.2
0.120 Oh Pembantuk tukang listrik @ Rp. 80,000.00 = Rp 9,600.00
0.150 Oh Tukang listrik @ Rp. 100,000.00 = Rp 15,000.00
0.100 Oh Kepala tukang istrik @ Rp. 110,000.00 = Rp 11,000.00
0.075 Oh Mandor @ Rp. 120,000.00 = Rp 9,000.00
Sub total : = Rp 44,600.00
Lain-lain K3 + CAR = Rp 1,047.30
JANGKA WAKTU PELAKSANAAN PEKERJAAN 150 ( SERATUS LIMA PULUH ) HARI KALENDER
BOBOT MINGGU KE
NO URAIAN PEKERJAAN
(%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 3 Hari
I. PEKERJAAN PERSIAPAN DAN PEKERJAAN RK3K KONSTRUKSI 100%
I.A. PEKERJAAN PERSIAPAN 2.042 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.095 0.041
I.B. PEKERJAAN RK3K KONSTRUKSI 0.925 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.043 0.019
75%
II.A. (1) PEKERJAAN STRUKTUR STANDART 29.806 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 2.129 50%
II.A. (2) PEKERJAAN ARSITEKTUR STANDART 33.475 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232 2.232
II.A. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL STANDAR 4.301 0.614 0.614 0.614 0.614 0.614 0.614 0.614
II.B. (1) PEKERJAAN STRUKTUR NON STANDART 15.128 1.891 1.891 1.891 1.891 1.891 1.891 1.891 1.891
II.B. (2) PEKERJAAN ARSITEKTUR NON STANDART 9.879 1.646 1.646 1.646 1.646 1.646 1.646
II.B. (3) PEKERJAAN MEKANIKAL DAN ELEKTRIKAL NON STANDART 4.443 0.444 0.444 0.444 0.444 0.444 0.444 0.444 0.444 0.444 0.444
RENCANA BOBOT MINGGUAN 100.000 0.138 0.138 2.029 2.029 4.158 4.158 4.499 4.499 4.499 6.390 6.390 6.834 6.834 6.590 6.590 7.204 7.204 7.204 5.075 3.429 3.429 0.674
KOMULATIF RENCANA BOBOT MINGGUAN - 0.138 0.277 2.306 4.336 8.494 12.653 17.152 21.651 26.150 32.540 38.930 45.765 52.599 59.189 65.779 72.984 80.188 87.393 92.468 95.897 99.326 100.000
150 Hari
84 Hari
0 7 112 147
P H O
14 35 77 91
150
A B C D E F G H
147 I
0 7 14 35 77 91 112
150
7 Hari 7 Hari 21 Hari 42 Hari 14 Hari 21 Hari 35 Hari 3 Hari
98 Hari
70 Hari
0
0
0
0
JADWAL PENUGASAN PERSONIL
JANGKA WAKTU PELAKSANAAN PEKERJAAN 150 ( SERATUS LIMA PULUH ) HARI KALENDER
Jumlah Satuan Pengalaman MINGGU KE
No. Uraian Pekerjaan KET
( Tahun ) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 7 Hari 3 Hari
PERSONIL :
1 Pelaksana 1 Orang 2
0
0
0
0
JADWAL PENGIRIMAN BAHAN
BAHAN :
1 Beton readymix K-300
2 Besi beton
3 Kawat beton
4 Kayu Kaso 5/7
5 Multiplek 9 mm
6 Balok
7 Minyak bekisting
8 Paku
9 Tanah urug
10 Pasir urug
11 Semen PC
12 Pasir Beton
13 Batu split
14 Besi Wiremesh M-8
15 Atap Baja Ringan
16 Pipa baja 4, T = 3.2 mm
17 Base plate t= 6mm
18 Mur Baut A325 HTB Dia 12 mm
19 Sika
20 Tiang Pancang 25x25 cm
21 Pasir pasang
22 Bata ringan/Hebel
23 Semen acian mortar
24 Semen plester mortar
25 Gypsumboard 9 mm
26 Rangka holow 4/4
27 Pipa Stainless steel
28 Keramik 20x25
29 Grill besi
30 Plint Homogenous Tile 10x60
31 Keramik 20x20
Granit Homogenous Tile polish Uk. 60x60 cm
Granit Homogenous Tile unpolish Uk. 60x60 cm
32 Kusen Alumunium
33 Selimar Alumunium
34 Daun pintu dan kusen UPVC
35 Kaca 8 mm
36 Kaca 6 mm
37 Aksesories
38 Glassblock 20 x 20
39 Roster 20 x 20
40 Pintu Besi
41 Besi Holow 4/4
42 Gypsum Board 9 mm
43 Hollow 4/4 galvanis
44 GRC Board 6 mm
45 List Plafond 5 cm
46 Step Nozing Uk. 10 x 60 cm
47 Waterproofing Membran Bakar
48 Waterproofing Liquid
49 Closet Jongkok Type Standar
50 Shower + Kran Stainless
51 Kran Stainless
52 Floor Drain Stainless
53 Cat tembok eksterior
54 Cat tembok interior
55 Cat Epoxy 500 micron
56 Logo Signage PU, Baja 3mm uk 80x80
57 Atap Metal Berpasir T=0.35 MM
58 Nok Genteng Metal
59 Lisplang GRC tebal 9 mm lebar 30 cm
60 Tanah Subur
61 Tanaman Rumput Gajah Mini
62 Tanaman Kacang-kacangan
63 Tanaman Rolia Ungu
64 Tanaman Pohon Zodia T= 25-40 cm
65 Tanaman Pohon Mangga diameter 10 - 15 cm Tinggi =2,5 m
66 Tanaman Pohon Kelengkeng diameter 10 - 15 cm Tinggi = 2,5 m
67 Tanaman Pohon Rambutan diameter 10 - 15 cm Tinggi = 2,5 m
68 Tanaman Pohon Tabebuya diamater 10 - 15 cm Tinggi = 3 m
69 Tanaman Pohon Ketapang Kencana diameter 10 - 15 cm Tinggi = 3 Meter
70 Pohon Pucuk Merah Tinggi = 2 meter
71 Pasir urug
72 Paving Blok t = 6 cm (standart)
73 Kanstein uk. 8.40.20
74 Grass Blok t = 6 cm (standart)
75 Bata merah
76 Buis Beton Setengah Lingkaran 30 cm
77 Gorong-Gorong dia. 60 cm
78 Grill penutup saluran, besi siku 50.50.5 + plat strip
79 Lemari Surat
80 Nama Ruangan 10x20 cm -acrylic
81 Nama Lantai 30x30 -acrylic
82 Papan Informasi Denah Bangunan 60x120 cm -acrylic
83 Pipa PVC kelas AW
84 Gate Valve
85 Clean Out (CO)
86 Portable Grease Trap
87 Pipa PVC Kelas D
88 Panel Lt.I
89 KW-meter/1ph/6A
90 Panel Unit
91 NYY 4 x 10 mm2 + E-NYA 6 mm2
92 NYM 3 x 4 mm2
92 Kabel Tray W200 x H100
93 Elbow W200 x H100
94 Lampu LED 9 Watt
95 Lampu LED 9 Watt, c/w battery charger (Selasar)
96 Lampu LED 7 Watt
97 Lampu baret isi TL Bulat-20 watt c/w battery charger
98 Exit Lamp-18 watt c/w battery charger
99 Lampu TL 1 x 36 watt, Balk
100 Stop Kontak 1P, 220 Volt, 10A, Wall Type
101 Saklar 1 Gang
102 Saklar 2 Gang
103 Saklar Hotel 1 Gang
104 Saklar Hotel 2 Gang
105 NYM 3 x 2,5 mm2 + PVC Conduit dia.20
106 Panel Lt.II
107 Panel MDP
108 Panel Pompa Air Berrsih
109 NYY 4 x 10 mm2 + E-NYA 10 mm2
110 NYY 4 x 6 mm2 + E-NYA 6 mm2
111 NYY 4 x 4 mm2 + E-NYA 4 mm2
112 TL 1 x 18 W, TL Balk Type
113 Grounding Rod GIP 1'
114 Termination R.Supporting Material
115 Kabel BC 50 mm2
116 Gate Valve
117 Type Class ABC 3,5 kg DCP Seamless, c/w support
118 Exhaust kap 100 Cfm ( ceiling Mounted )
119 Pipa PVC Class D
120 Grille 200 x 200 (Alumunium)
121 Lift Pump
122 Booster Pump / Distribution Pump
123 Pompa Shalow Well
124 Tangki Air Atas ( Type Cylinder ) kap. 1500 ltr
125 Ground Water Tank 4 m3
126 Gate Valve
127 Check Valve ( CV )
128 Strainer ( STR )
129 Flexible Joint ( FJ )
130 Foot Valve
131 Pressure Gauge
132 Pipa GIP
133 Meteran Air c/w GV dia. 50 & Box Meteran
134 Pasang Baru Daya Listrik PLN 66 KVA (66000 VA)
135 Roof drain
0
0
0
0
JADWAL PENGGUNAAN PERALATAN
0
0
0
0
FORMULIR REKAPITULASI PERHITUNGAN TKDN
NILAI KONTRAK (Rp)
URAIAN Total %TKDN
LN DN
Rp %KDN
BARANG
1. Material Langsung (Bahan Baku) - 1,051,692,378.93 1,051,692,378.93 100.00 100.00
2. Peralatan (Barang Jadi) - 525,846,189.46 525,846,189.46 100.00 100.00
0
0
0
0
BAGIAN PEKERJAAN YANG AKAN DISUBKONTRAKKAN
TOTAL ( % ) -
Catatan :
Leveransir / Pemasok bahan tidak termasuk sebagai Sub-Kontraktor
0
0
0
0
DAFTAR BARANG YANG DI IMPORT
TOTAL HARGA
0
0
0
0
VOLUME KOMPONEN STRUKTUR
Pekerjaan : PEMBANGUNAN RUMAH SUSUN PONPES BARAK PANJANG
Jumlah Lantai : 3 LANTAI
Lokasi : KDS-D
Tahun Anggaran : 2019
VOL TIE BEAM total panjang : 64 277.7 m' Lantai urugan pasir,
Kerja m3
TB-1 250 x 450 mm TOTAL
b (m) h (m) ts (m) P (Autocad) 1m3 Tul Lentur Jml D As s Weight Pjg Tot. Pjg Vol. (kg) Vc Ws Begisting 0.05 0.1
0.25 0.45 0 213.7 24.041 Tul / Tumpuan 3 16 201.06 - 1.576 138.85 416.55 656.61 24.041 4839.13 245.755 2.67 5.34
panjang bersih 213.7 3 16 201.06 - 1.576 138.85 416.55 656.61
selimut beton 0.03 Tul / Lapangan 3 16 201.06 - 1.576 138.85 416.55 656.61
PC hook tul sengkang 0.07 3 16 201.06 - 1.576 138.85 416.55 656.61
panjang joint 40 D 7.68 Pengekang 2 10 78.54 - 0.616 213.7 427.4 263.17
total 2897.30
TOTAL
1 PC-1 VC TOTAL WS TOTAL WS/VC {KG) BEGISTING
1600 x 1600
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
1.6 1.6 0.85 1.92 atas / arah panjang 11 13.00 132.73 150 1.041 3.215 35.365 36.80 76.8 7781.3152 101.31921 217.6
tebal pelat : 0.1 m atas / arah pendek 11 13.00 132.73 150 1.041 3.215 35.365 36.80
tebal selimut : 0.075 m bawah / arah panj. 11 16.00 201.06 150 1.576 3.215 35.365 55.75
bawah / arah pendek 11 16.00 201.06 150 1.576 3.215 35.365 55.75
Pinggang 2 10.00 78.54 0.616 6.1 12.200 7.51
Bendrat 1.93
Luas BEGISTING 5.44 m2 Tot. Vol 194.53
Waste 0% 0.00
Grand Tot. Vol 194.53
Rasio besi/vol (kg/m3) 101.32
Rasio beton/luas (m3/m2) 0.35
TOTAL
2 PC-2 VC TOTAL WS TOTAL WS/VC (KG) BEGISTING
1200 x 1200
b L T 1m3 Tul Jml D As s Weight Pjg Tot. Pjg Vol. (kg)
1.2 1.2 0.85 1.08 atas / arah panjang 9 13.00 132.73 150 1.041 2.815 25.335 26.36 2.16 279.04486 129.18744 8.16
tebal pelat : 0.1 m atas / arah pendek 9 13.00 132.73 150 1.041 2.815 25.335 26.36
tebal selimut : 0.075 m bawah / arah panj. 9 16.00 201.06 150 1.576 2.815 25.335 39.94
bawah / arah pendek 9 16.00 201.06 150 1.576 2.815 25.335 39.94
Pinggang 2 10.00 78.54 0.616 4.5 9.000 5.54
Bendrat 1.38
Luas 4.08 m2 Tot. Vol 139.52
Waste 0% 0.00
Grand Tot. Vol 139.52
Rasio besi/vol (kg/m3) 129.19
Rasio beton/luas (m3/m2) 0.26
LUAS BANGUNAN
LANTAI Panjang Lebar Bukaan Luas (a) Dari Autocad) satuan KELILING satuan
dalm
LT.DASAR bangunan 587 m2 122.5 M'
luar
LT.DASAR bangunan 163.36 m2 132 M'
LT.2 516.2 m2 108.7 M'
LT.3 516.2 m2 108.7 M'
LT.dak Atap 73.5 m2 100.6 M'