PEKERJAAN :
PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)
LOKASI PEKERJAAN :
JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PROVINSI PAPUA
KONSULTAN PENGAWAS :
TAHUN ANGGARAN :
2023
PEKERJAAN : PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)
TIPE PROTOTYPE : RUMAH SUSUN T-36 KDS-D
JUMLAH LANTAI : 3 LANTAI
LOKASI PEKERJAAN : JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PENYEDIA JASA KONSTRUKSI : CV. DUNSADA ENGINEERING
TAHUN ANGGARAN : 2023
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE - 1
( 22 November s/d 26 November 2024 )
Progres Mingguan
NO. URAIAN PEKERJAAN s/d Minggu Lalu MINGGU INI s/d MINGGU INI PERSENTASE
JUMLAH BOBOT
BOBOT BOBOT BOBOT TERHADAP ITEM
HARGA (%)
(%) ( %) (%) PEKERJAAN ( % )
Page 1
PEKERJAAN : PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)
TIPE PROTOTYPE : RUMAH SUSUN T-36 KDS-D
JUMLAH LANTAI : 3 LANTAI
LOKASI PEKERJAAN : JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PENYEDIA JASA KONSTRUKSI : CV. DUNSADA ENGINEERING
TAHUN ANGGARAN : 2023
Page 2
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
7, P3K
a Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, dll) Ls 1,00 1,00 1.000.000,00 1.000.000,00 0,14 1,00 0,14 1,00 0,14 100,00%
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Timbangan Berat Badan, Tensi Meter, dll); Ls 1,00 1,00 1.000.000,00 1.000.000,00 0,14 1,00 0,14 1,00 0,14 100,00%
Page 3
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
Fitting-Fitting :
- Elbow W200 x H100 bh 1,00 184.703,85 - - - 0,00%
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 - - - - 0,00%
Page 4
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
A.2 LANTAI 2
1, PEMIPAAN AIR BERSIH 4.509.699,06 0,64
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 352,00 42.307,65 - - - 0,00%
- PVC AW dia. 20 m 64,00 44.475,75 2.846.448,00 0,40 - - - 0,00%
- PVC AW dia. 40 m 110,00 74.333,70 - - - 0,00%
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 16,00 80.661,49 1.290.583,80 0,18 - - - 0,00%
Peralatan Katup-katup - - - 0,00%
(Ball Valve & Gate Valve) - - - 0,00%
- dia. 40 bh 1,00 372.667,26 372.667,26 0,05 - - - 0,00%
- Meter Air c/w BV dia. 20 bh 16,00 378.183,76 - - - 0,00%
5, INSTALASI PANEL
Pengadaan dan pemasangan PP-LT.2 unit 1,00 7.637.995,45 - - - 0,00%
dengan komponen panel, sbb :
- MCCB 3P, 63 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 16,00 380.610,92 - - - 0,00%
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16,00 770.855,65 - - - 0,00%
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
Page 5
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
- Box Hanger : 1 bh
A.3. LANTAI 3
1, PEMIPAAN AIR BERSIH 8.232.772,26 1,17
Pipa PVC Kelas AW (Incl. Fitting & Accessories)
- PVC AW dia. 15 m 88,00 42.307,65 3.723.073,20 0,53 - - - 0,00%
- PVC AW dia. 20 m 64,00 44.475,75 2.846.448,00 0,40 - - - 0,00%
- PVC AW dia. 40 m 110,00 74.333,70 - - - 0,00%
- PVC AW dia. 50 (Riser dari Tangki Air Atas) m 16,00 80.661,49 1.290.583,80 0,18 - - - 0,00%
Peralatan Katup-katup - - - 0,00%
(Ball Valve & Gate Valve) - - - 0,00%
- dia. 40 bh 1,00 372.667,26 372.667,26 0,05 - - - 0,00%
- Meter Air c/w BV dia. 20 bh 16,00 378.183,76 - - - 0,00%
Page 6
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
4, PEMIPAAN VENT - -
Pipa PVC Kelas D (Incl. Fitting & Accessories)
- Dia. 80 ( pipa riser ) m 64,00 104.787,68 - - - 0,00%
- Dia. 32 m 192,00 70.934,74 - - - 0,00%
5, INSTALASI PANEL - -
Pengadaan dan pemasangan PP-LT.3 unit 1,00 7.637.995,45 - - - 0,00%
dengan komponen panel, sbb :
- MCCB 3P, 63 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 63 A
- Accessories & Termination
- Box Panel
- KW-meter/1ph/6A bh 16,00 380.610,92 - - - 0,00%
Pengadaan dan pemasangan P-UNIT , dengan komponen panel sbb : unit 16,00 770.855,65 - - - 0,00%
- MCB 1P, 6 A : 1 bh
- MCB 1P, 6 A : 2 bh
- Box Hanger : 1 bh
Page 7
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
- Material bantu ( mur, baut, hanger rod, supporting, dll ) lot 1,00 3.694,08 3.694,08 0,00 - - - 0,00%
b P-MDP
Pengadaan dan pemasangan MDP, dengan komponen panel, sbb : unit 1,00 4.035.720,95 4.035.720,95 0,57 - - - 0,00%
- Mgs 3P, 63 A
- MCCB 3P, 200 A
- MCCB 3P, 80 A
- MCCB 3P, 32 A
- MCB 3P, 32 A
- Contacto, (timer switch)
Page 8
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
c P-PENGELOLA
Pengadaan dan pemasangan P-PENGELOLA dengan komponen panel, sbb : unit 1,00 3.478.052,95 3.478.052,95 0,49 - - - 0,00%
- MCCB 3P, 80 A
- MCB 3P, 63 A
- MCB 3P, 32 A
- MCB 1P, 6 A
- Ampere-meter 50/5 A
- Volt-meter 0-500 Volt
- Volt Selector Switch
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 80 A
- Accessories & Termination
- Box Panel
- KW-meter/3ph/80A bh 1,00 1.244.773,15 1.244.773,15 0,18 - - - 0,00%
e P-POMPA HYDRANT
Pengadaan dan pemasangan P-POMPA HYDRANT, dengan komponen panel, sbb : unit 1,00 15.062.702,95 15.062.702,95 2,14 - - - 0,00%
- MCB 3P, 40 A
- MCB 3P, 16 A
- WLC 61F G-AP 220 Volt
- DOL ( Direct On Line )
- Fuse 2 A
- Indicator Lamp
- Rel MCB 3P
- Cu Bar 5 x 32 A
- Accessories & Termination
- Box Panel
Page 9
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
b Lampu Taman
- Lampu Taman/ Penerangan Luar ( t = 2,5 m ) SL 26 watt bh 12,00 1.263.102,98 - - - 0,00%
b Lampu Taman
- NYFGBY 3 x 2,5 mm2 untuk Lampu Taman ttk 12,00 10.760.110,18 - - - 0,00%
a Body Panel
Item SBB:
Grounding Rod GIP 1' ( untuk R lebih kecil dari 2 ohm ) Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box bh 1,00 811.440,24 811.440,24 0,12 - - - 0,00%
Termination R.Supporting Material lot 1,00 1.451.070,89 1.451.070,89 0,21 - - - 0,00%
Kabel BC 50 mm2 m 30,00 97.179,57 2.915.387,00 0,41 - - - 0,00%
Testing & Commissioning lot 1,00 517.789,81 517.789,81 0,07 - - - 0,00%
INSTALASI
- Splitzen T=1 meter, pipa galvanized c/w : peralatan bantu unit 11,00 501.951,35 5.521.464,85 0,78 - - - 0,00%
- Bak kontrol 40x40x30 cm unit 2,00 634.511,04 1.269.022,08 0,18 - - - 0,00%
- Down Conduktor BC 50mm + accessories m' 84,28 97.179,57 8.189.904,04 1,16 - - - 0,00%
- Grounding System max. 2 ohm lot 2,00 811.440,24 1.622.880,48 0,23 - - - 0,00%
Copper Rod, kabel BC, clamp rod, Bar CU, kontrol Box
- Biaya Instalasi lot 1,00 411.981,79 411.981,79 0,06 - - - 0,00%
- Material Bantu lot 1,00 329.585,43 329.585,43 0,05 - - - 0,00%
- Testing & Comissioning included perijinan dari DEPNAKER lot 1,00 1.067.770,13 1.067.770,13 0,15 - - - 0,00%
- Bracket, Seal , Test Box , dls lot 1,00 247.189,07 247.189,07 0,04 - - - 0,00%
LANTAI 1
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
Page 10
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00 386.455,90 1.159.367,70 0,16 - - - 0,00%
- Type Class BC 4,6 kg CO2 Seamless, c/w support bh 1,00 897.233,65 897.233,65 0,13 - - - 0,00%
LANTAI 2
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00 386.455,90 1.159.367,70 0,16 - - - 0,00%
LANTAI 3
Fire Extinguisher Tabung Cat Oven sesuai SPEK & Skedul :
- Type Class ABC 3,5 kg DCP Seamless, c/w support bh 3,00 386.455,90 1.159.367,70 0,16 - - - 0,00%
b SPLITTER TV
Pengadan dan pemasangan Splitter TV, berikut alat/material bantu lainnya sesuai Gambar dan Spesifikasi Teknis.
LANTAI 1
Splitter 7 ports bh 3,00 93.606,38 280.819,14 0,04 - - - 0,00%
TB-Splitter-TV/LT.1 bh 1,00 96.126,42 96.126,42 0,01 - - - 0,00%
Lantai 2
Splitter 7 ports bh 4,00 93.606,38 374.425,52 0,05 - - - 0,00%
TB-Splitter-TV/LT.2 bh 1,00 96.126,42 96.126,42 0,01 - - - 0,00%
Lantai 3
Splitter 7 ports bh 4,00 93.606,38 374.425,52 0,05 - - - 0,00%
TB-Splitter-TV/LT.3 bh 1,00 96.126,42 96.126,42 0,01 - - - 0,00%
c INSTALASI KABEL FEEDER SPLITTER TV
Instalasi Kabel Feeder Splitter TV menggunakan kabel coaxial berikut semua aksesoris, material / alat bantu
pemasangan sesuai detail Gambar dan Spesifikasi Teknis.
Lantai 1
Coaxial 7C/2V dari TB-Splitter-TV/lt.2 ke TB-Splitter-Lt.1 mtr 10,00 38.842,58 388.425,79 0,06 - - - 0,00%
Lantai 2
Coaxial 7C/2V dari TB-Splitter-TV/lt.3 ke TB-Splitter-Lt.2 mtr 14,69 38.842,58 570.415,54 0,08 - - - 0,00%
Lantai 3
Coaxial 7C/2V dari TB-Splitter-TV/lt.4 ke TB-Splitter-Lt.3 mtr 10,00 38.842,58 388.425,79 0,06 - - - 0,00%
d TV OUTLET
Pengadan dan pemasangan TV Outlet, berikut alat/material bantu lainnya sesuai Gambar dan Spesifikasi teknis
Lantai 1
TV Outlet bh 12,00 72.543,38 870.520,55 0,12 - - - 0,00%
Lantai 2
TV Outlet bh 16,00 72.543,38 1.160.694,07 0,16 - - - 0,00%
Lantai 3
TV Outlet bh 16,00 72.543,38 1.160.694,07 0,16 - - - 0,00%
e INSTALASI OUTLET TV
Instalasi kabel Outlet TV menggunakan kabel Coaxial 5C/2V dalam conduit PVC HI dia.20 mm2 lengkap dengan
Page 11
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
bobokan dan perapihan kembali, peralatan bantu dan aksesoris sesuai detail Gambar dan Spesifikasi Teknis.
Lantai 1
TV Outlet ttk 10,00 717.766,86 7.177.668,60 1,02 - - - 0,00%
Lantai 2
TV Outlet ttk 10,00 717.766,86 7.177.668,60 1,02 - - - 0,00%
Lantai 3
TV Outlet ttk 10,00 717.766,86 7.177.668,60 1,02 - - - 0,00%
II PEKERJAAN FIRE ALARM 85.085.268,23 12,09
a PERALATAN UTAMA FIRE ALARM SYSTEM
Pengadaan dan pemasangan peralatan Sistem Fire Alarm ditempatkan di Ruang Kontrol secara lengkap termasuk
pengkabelan dan koneksi meliputi peralatan sesuai diuraikan dlm Gambar dan Spesifikasi Teknis, tetapi tidak
terbats pada item sebagai berikut :
MCFA, kapasitas 10 Zone unit 1,00 10.952.748,16 10.952.748,16 1,56 - - - 0,00%
MDF, kapasitas 10 Zone set 1,00 6.647.997,54 6.647.997,54 0,94 - - - 0,00%
Rectifier bh 1,00 1.539.166,89 1.539.166,89 0,22 - - - 0,00%
Power Surge Arrester bh 1,00 1.304.630,38 1.304.630,38 0,19 - - - 0,00%
Battery & Charger 4 jam bh 1,00 1.508.659,24 1.508.659,24 0,21 - - - 0,00%
Grounding u/ MCFA dan Surge Arrester ( R < 0,5 Ohm ) lot 1,00 811.440,24 811.440,24 0,12 - - - 0,00%
Page 12
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
Lantai 3
- Rate Of Rise Temperature - Heat detector ttk 10,00 485.547,29 4.855.472,85 0,69 - - - 0,00%
- Manual push button ttk 1,00 602.277,83 602.277,83 0,09 - - - 0,00%
- Lampu Indikator ttk 1,00 824.943,83 824.943,83 0,12 - - - 0,00%
- Bell alarm ttk 1,00 602.277,83 602.277,83 0,09 - - - 0,00%
Testing & Comissioning included perijinan dari DEPNAKER lot 1,00 1.067.770,13 1.067.770,13 0,15 - - - 0,00%
Page 13
KONTRAK PROGRES MINGGU INI
s/d MINGGU LALU MINGGU INI s/d MINGGU INI PERSENTASE
NO. URAIAN PEKERJAAN SAT. HARGA JUMLAH BOBOT
VOLUME Waktu BOBOT BOBOT BOBOT TERHADAP ITEM
SATUAN HARGA (%) VOLUME VOLUME VOLUME
(%) ( %) (%) PEKERJAAN ( % )
- Meteran Air c/w GV dia. 50 & Box Meteran unit 1,00 1.564.231,26 1.564.231,26 0,22 - - - 0,00%
7 INSTALASI PEMIPAAN
Pengadaan dan pemasangan unit.
Pemipaan PVC AW (Incl. Fitting & All Accessories)
a SITE PLAN
1. Dari Box Meter PDAM ke GWT
- PVC AW dia. 50 (Dari Box Meter PDAM ke GWT) m 10,00 80.661,49 806.614,88 0,11 - - - 0,00%
2. Pemipaan R.Pompa ke Tanki Air Atas
- GIP dia. 65 m 46,00 194.949,90
b Penyambungan pipa PDAM, pipa gip dia. 65 termasuk lot tidak ditawarkan -
Perijinan.
2, INSTALASI AIR KOTOR & AIR BEKAS 6.200.803,17 0,88
Septic Tank Anaerobic Biological Filtration unit 2,00 37.089.937,00 - - - 0,00%
Kapasitas : 9 m3 / hari
Resapan unit 2,00 2.566.516,52 5.133.033,04 0,73 - - - 0,00%
Kapasitas : 5 m3
- Struktur Pondasi By Sipil
Portable Grease Trap unit 44,00 597.055,81 - - - 0,00%
Kapasitas
TESTING COMMISSIONING lot 1,00 1.067.770,13 1.067.770,13 0,15 - - - 0,00%
PEMBULATAN 781.438.000,00
Page 14
PEKERJAAN : PERAWATAN RUMAH RUSUN KELUARGA TNI/POLRI (POLRES MERAUKE)
TIPE PROTOTYPE : RUMAH SUSUN T-36 KDS-D
JUMLAH LANTAI : 3 LANTAI
LOKASI PEKERJAAN : JL. RAYA MERDEKA KAB. MERAUKE, POV. PAPUA (POLRES MERAUKE)
PENYEDIA JASA KONSTRUKSI : CV. DUNSADA ENGINEERING
TAHUN ANGGARAN : 2023
LAPORAN KEMAJUAN PEKERJAAN MINGGU KE - 1
B.2 PEKERJAAN VENTILASI UDARA 80.788.812,00 11,48 2,87 2,87 2,87 2,87
B.3. PEKERJAAN INSTALASI ELEKTRONIK 118.109.962,70 16,78 3,36 3,36 3,36 3,36 3,36
BOBOT RENCANA MINGGU INI (%) 8,30 30,08 26,59 16,69 11,20 7,14
BOBOT KOMULATIS RENCANA S/D MINGGU INI(%) 8,30 38,39 64,97 81,66 92,86 100,00
BOBOT REALISASI MINGGU INI (%) -
BOBOT KOMULATIS REALISASI S/D MINGGU INI (%) -
DEVIASI KOMULATIS S/D MINGGU INI (%) - 8,30
Page 15