LAPORAN MINGGUAN
KONSULTAN PENGAWAS
PT. BAGUS DARAJAT KONSULTAN
REKAPITULASI LAPORAN MINGGUAN KEMAJUAN PEKERJAAN
A PEKERJAAN PERSIAPAN 252.495.468,49 3,02 213.658.133,08 2,55 2.126.264,58 0,03 215.784.397,66 2,58
A Jumlah total 8.366.509.662,01 100,00 4.645.781.039,79 55,53 247.906.020,09 2,96 4.893.687.059,87 58,49
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 920.316.062,82 511.035.914,38 27.269.662,21 538.305.576,59
C Jumlah total harga pekerjaan =(B) + (C) 9.286.825.724,84 5.156.816.954,16 275.175.682,30 5.431.992.636,46
Jumlah Harga Pekerjaan A. Persiapan 252.495.468,49 3,02 213.658.133,08 2,55 2.126.264,58 0,03 215.784.397,66 2,58
Jumlah Harga Pekerjaan Bangunan Creative Center B.1. Pekerjaan & Pondasi Batu Kali 238.763.591,31 2,85 238.763.591,31 2,85 - - 238.763.591,31 2,85
Jumlah Harga Pekerjaan Struktur Bangunan Creative Center B.2.1. Pekerjaan Struktur Bawah 977.425.044,69 11,68 977.425.044,69 11,68 - - 977.425.044,69 11,68
Jumlah Harga Pekerjaan Strukutur Bangunan Creative Center B.2.2. Pekerjaan Struktur Atas 2.309.686.661,79 27,61 2.266.766.244,03 27,09 - - 2.266.766.244,03 27,09
Jumlah Harga Pekerjaan Arsitek Bangunan Creative Center B.3.1. Arsitek Lt. Satu 1.178.017.366,16 14,08 236.698.892,44 2,83 193.293.549,99 2,31 429.992.442,43 5,14
Jumlah Harga Pekerjaan Arsitek Bangunan Creative Center B.3.2. Arsitek Lt. Dua 1.771.098.824,35 21,17 511.228.424,24 6,11 33.613.205,52 0,40 544.841.629,75 6,51
Jumlah Harga Pekerjaan Sanitair Bangunan Creative Center B.4. Pekerjaan Sanitair 37.650.394,10 0,45 - - - - - -
C BANGUNAN AMPLITHEATER
1 Pek. Pengecatan Backdrop Teracota Existing m2 43.554 - - - - - - - - - - -
2 Pek. Pas. Lantai Batu Andesit + Coating m2 266.144 192,61 51.261.985,05 0,61 - - - - - - - -
E PERKERASAN JALAN
1 Coating Aspal Area Parkiran ton 677.725 - - - - - - - - - - -
2 Pek. Pas. Blumbak t = 15 cm m1 148.116 91,70 13.582.260,38 0,16 - - - - - - - -
3 Pek. Pasang Pohon Ketapang Tinggi 2 Meter bh 250.000 - - - - - - - - - - -
4 Pek. Pasangan Batu Telor m2 180.190 - - - - - - - - - - -
5 Pek. Garis Marka Jalan m2 104.712 24,66 2.582.196,46 0,03 - - - - - - - -
6 Pek. Lantai Batu Andesit + Coating m2 266.144 608,96 162.071.016,14 1,94 - - - - - - - -
Jumlah Harga Pekerjaan Mekanikal Electrical & Plambing A.1.1. Air Bersih 86.634.500,00 1,04 3.340.000,00 0,04 5.010.000,00 0,06 8.350.000,00 0,10
Jumlah Harga Pekerjaan Mekanikal Electrical & Plambing A.1.2. Instalasi Air Bersih 23.184.000,00 0,28 2.560.000,00 0,03 3.372.000,00 0,04 5.932.000,00 0,07
III AIR KOTOR, BEKAS & VENT
3.1. Peralatan Utama Air Kotor,Bekas & Vent
a. Site Development
1 STP Kap. 10 m3 Unit 45.942.000 1,00 45.942.000,00 0,55 1,00 45.942.000,00 0,55 - - 1,00 45.942.000,00 0,55
Material
Silinder Fiberglass - - - -
Inflow dia 100 mm - - - -
Outflowdia 100 mm - - - -
Include : Galian, urugan pasir pasang, rabat beton , Dll - - - -
- - - -
3.2. Instalasi Air Kotor,Bekas & Vent - - - -
a. Site Development - - - -
1 Pemipaan Pipa PVC AW - - - -
- Pipa PVC AW Dia. 100 mm meter 199.000 55,00 10.945.000,00 0,13 38,50 7.661.500,00 0,09 6,50 1.293.500,00 0,02 45,00 8.955.000,00 0,11
- - - -
b Lantai Satu - - - -
1 Pemipaan Pipa PVC AW - - - -
AIR BEKAS - - - -
- Pipa PVC AW Dia. 65 mm meter 98.000 18,00 1.764.000,00 0,02 3,60 352.800,00 0,00 5,00 490.000,00 0,01 8,60 842.800,00 0,01
- Pipa PVC AW Dia. 80 mm meter 129.000 28,50 3.676.500,00 0,04 5,70 735.300,00 0,01 5,00 645.000,00 0,01 10,70 1.380.300,00 0,02
- Pipa PVC AW Dia. 100 mm meter 199.000 31,20 6.208.800,00 0,07 21,84 4.346.160,00 0,05 5,00 995.000,00 0,01 26,84 5.341.160,00 0,06
- - - -
AIR KOTOR - - - -
- Pipa PVC AW Dia. 100 mm meter 199.000 98,00 19.502.000,00 0,23 34,30 6.825.700,00 0,08 20,70 4.119.300,00 0,05 55,00 10.945.000,00 0,13
- - - -
FLOOR CLEAN OUT - - - -
- Dia 80 mm buah 255.000 2,00 510.000,00 0,01 - - - - - - - -
- Dia 100 mm buah 276.000 2,00 552.000,00 0,01 - - - - - - - -
- - - -
3 Pemipaan Vent Pipa PVC D - - - -
- Pipa PVC AW Dia. 20 mm meter 45.000 16,00 720.000,00 0,01 - - - - - - - -
- Pipa PVC AW Dia. 50 mm meter 74.000 6,00 444.000,00 0,01 - - - - - - - -
- - - -
b Lantai Dua - - - -
1 Pemipaan Pipa PVC AW - - - -
AIR BEKAS - - - -
- Pipa PVC AW Dia. 50 mm meter 74.000 17,70 1.309.800,00 0,02 8,85 654.900,00 0,01 5,15 381.100,00 0,00 14,00 1.036.000,00 0,01
- Pipa PVC AW Dia. 80 mm meter 129.000 24,20 3.121.800,00 0,04 12,10 1.560.900,00 0,02 9,90 1.277.100,00 0,02 22,00 2.838.000,00 0,03
- - - -
AIR KOTOR - - - -
- Pipa PVC AW Dia. 100 mm meter 129.000 44,10 5.688.900,00 0,07 22,05 2.844.450,00 0,03 10,00 1.290.000,00 0,02 32,05 4.134.450,00 0,05
- - - -
FLOOR CLEAN OUT - - - -
- Dia 80 mm buah 255.000 3,00 765.000,00 0,01 - - - - - - - -
- Dia 100 mm buah 276.000 3,00 828.000,00 0,01 - - - - - - - -
- - - -
3 Pemipaan Vent Pipa PVC D - - - -
- Pipa PVC AW Dia. 20 mm meter 45.000 24,00 1.080.000,00 0,01 - - - - - - - -
- Pipa PVC AW Dia. 50 mm meter 74.000 12,10 895.400,00 0,01 - - - - - - - -
Jumlah Harga Pekerjaan Mekanikal Electrical & Plambing III. Air Kotor, Bekas & Vent 103.953.200,00 1,24 70.923.710,00 0,85 10.491.000,00 0,13 81.414.710,00 0,97
IV AIR HUJAN
1 Gedung Creative
Pemipaan Pipa PVC AW
- Pipa PVC AW Dia. 100 mm meter 199.000 72,00 14.328.000,00 0,17 - - - - - - - - -
- Roof Drain Dia. 100 mm Buah 245.000 14,00 3.430.000,00 0,04 - - - - - - - - -
Jumlah Harga Pekerjaan Mekanikal Electrical & Plambing IV. Air Hujan 17.758.000,00 0,21 - - - - - -
Jumlah Harga Pekerjaan Mekanikal Electrical & Plambing III. Tata Udara 14.302.000,00 0,17 - - - - - -
C. ELEKTRIKAL
I. ELEKTRIKAL/ARUS KUAT
1.1. Peralatan Utama
1 Penyambungan Daya PLN 55.000 VA ls 61.500.000 1,00 61.500.000,00 0,74 - - - - - - - -
- - - -
2 Instalasi Rumah Genset Unit 18.689.000 - - - - - - - - - - -
Lengkap Dengan: Panel Kontrol - - - -
Tanki Mingguan 100 Liter - - - -
Panel Kontrol Genset ATS/AMF - - - -
- - - -
1.2. Kabel Feeder - - - -
1 Dari Gardu PLN
NYY
ke4Panel
x 50 mm
SDP meter 804.000 35,00 28.140.000,00 0,34 - - - - - - - -
- - - -
2 Dari SDP ke - - - -
PP/LP-1 NYFGBY 4 x 4 mm meter 267.000 12,00 3.204.000,00 0,04 - - - - - - - -
PP - 1 NYY 4 x 10 mm meter 164.000 12,00 1.968.000,00 0,02 - - - - - - - -
PP - 2 NYY 4 x 10 mm meter - - -
P-AC.1 NYY 4 x 6 mm meter 155.000 5,00 775.000,00 0,01 - - - - - - - -
P-AC.2 NYY 4 x 10 mm meter - - -
P- AMPHITHEATER
NYFGBY 4 x 4 mm meter 267.000 - - - - - - - - - - -
P- BOOSTER
NYY 4 x 4 mm meter 110.000 65,00 7.150.000,00 0,09 - - - - - - - -
- - - -
1.3. Panel - - - -
SDP Unit 22.500.000 1,00 22.500.000,00 0,27 0,20 4.500.000,00 0,05 - - 0,20 4.500.000,00 0,05
- Pilot lamp R, S, & T - - - -
- Fuse 2A - - - -
- Ampermeter - - - -
- voltmeter - - - -
- SS - - - -
- MCCB 3 PH 100-160A - - - -
- MCB 3 PH 25A - - - -
- Busbar Cu 5 (12 x 2) mm - - - -
- Accessories & Termination - - - -
- Box Panel - - - -
- - - -
PP/LP-1 Unit 22.000.000 1,00 22.000.000,00 0,26 0,20 4.400.000,00 0,05 - - 0,20 4.400.000,00 0,05
- Pilot lamp R, S, & T - - - -
- Fuse 2A - - - -
- Ampermeter - - - -
- voltmeter - - - -
- SS - - - -
- Timer switch + nicad batery - - - -
- Selector Timer - - - -
- MCCB 3 PH 20A - - - -
- MCB 3 PH 25A - - - -
- MCB 3 PH 10A - - - -
- Busbar Cu 5 (12 x 2) mm - - - -
- Accessories & Termination - - - -
- Box Panel IP65 - - - -
- - - -
PP - 1 Unit 18.500.000 1,00 18.500.000,00 0,22 0,20 3.700.000,00 0,04 - - 0,20 3.700.000,00 0,04
- Pilot lamp R, S, & T - - - -
- Fuse 2A - - - -
- Ampermeter - - - -
- voltmeter - - - -
- SS - - - -
- MCB 3 PH 25A - - - -
- MCB 3 PH 10A - - - -
- Busbar Cu 5 (12 x 3) mm - - - -
- Accessories & Termination - - - -
- Box Panel - - - -
- - - -
PP - 2 Unit 18.500.000 1,00 18.500.000,00 0,22 0,20 3.700.000,00 0,04 - - 0,20 3.700.000,00 0,04
- Pilot lamp R, S, & T - - - -
- Fuse 2A - - - -
- Ampermeter - - - -
- voltmeter - - - -
- SS - - - -
- MCB 3 PH 25A - - - -
- MCB 3 PH 10A - - - -
- Busbar Cu 5 (12 x 3) mm - - - -
- Accessories & Termination - - - -
- Box Panel - - - -
- - - -
P - AC.1 Unit 17.500.000 1,00 17.500.000,00 0,21 - - - - - - - -
- Pilot lamp R, S, & T - - - -
- Fuse 2A - - - -
- Ampermeter - - - -
- voltmeter - - - -
- SS - - - -
- MCB 3 PH 25A - - - -
- MCB 3 PH 10A - - - -
- Busbar Cu 5 (12 x 3) mm - - - -
- Accessories & Termination - - - -
- Box Panel - - - -
- - - -
P - AC.2 Unit 20.500.000 1,00 20.500.000,00 0,25 - - - - - - - -
- Pilot lamp R, S, & T - - - -
- Fuse 2A - - - -
- Ampermeter - - - -
- voltmeter - - - -
- SS - - - -
- MCB 3 PH 25A - - - -
- MCB 3 PH 10A - - - -
- Busbar Cu 5 (12 x 3) mm - - - -
- Accessories & Termination - - - -
- Box Panel - - - -
- - - -
P- BOOSTER Unit 20.500.000 1,00 20.500.000,00 0,25 - - - - - - - -
- Pilot lamp R, S, & T - - - -
- Fuse 2A - - - -
- Ampermeter - - - -
- voltmeter - - - -
- SS - - - -
- MCB 3 PH 25A - - - -
- MCB 3 PH 16A - - - -
- Busbar Cu 5 (12 x 3) mm - - - -
- Accessories & Termination - - - -
- Box Panel - - - -
- - - -
- - - -
1.4. Instalasi Penerangan Dan Stop Kontak - - - -
a. Site Development - - - -
- - - -
- Lampu Penerangan Lapang Basket 2 x 50 watt, buah 7.857.000 4,00 31.428.000,00 0,38 - - - - - - - -
termasuk Tiang lampu T:6 M, Pondasi - - - -
- Lampu Penerangan Lapang Skateboard 2 x 50 watt, buah 7.857.000 2,00 15.714.000,00 0,19 - - - - - - - -
termasuk Tiang lampu T:6 M, Pondasi - - - -
- Spot Light Waterprofing 5 watt LED ( Warm white ) buah 404.000 31,00 12.524.000,00 0,15 - - - - - - - -
- Spot Light Waterprofing 3 watt LED ( Warm white ) buah 344.000 44,00 15.136.000,00 0,18 - - - - - - - -
- Lampu sorot 20 watt Area Art Garden buah 706.000 2,00 1.412.000,00 0,02 - - - - - - - -
- Lampu sorot 50 watt Area Art Garden buah 948.000 5,00 4.740.000,00 0,06 - - - - - - - -
- Lampu sorot 50 watt Area Amphitheater buah 948.000 2,00 1.896.000,00 0,02 - - - - - - - -
- - - -
- Instalasi Penerangan Lampu Taman & Spotlight titik 285.000 84,00 23.940.000,00 0,29 - - - - - - - -
( NYY 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- Instalasi Penerangan Lampu Lapang Basket titik 315.000 6,00 1.890.000,00 0,02 - - - - - - - -
( NYY 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- - - -
Gedung Creative - - - -
b Lantai Satu - - - -
- Lampu DL Panel 10 watt LED buah 168.000 12,00 2.016.000,00 0,02 - - - - - - - -
- Lampu DL Panel 13 watt LED buah 192.000 86,00 16.512.000,00 0,20 - - - - - - - -
- RM 2 x 18 watt buah 585.000 8,00 4.680.000,00 0,06 - - - - - - - -
- Lampu TL BALK 1 x 36 buah 585.000 3,00 1.755.000,00 0,02 - - - - - - - -
- Lampu Baret 13 watt buah 247.000 4,00 988.000,00 0,01 - - - - - - - -
- LED Strip 5 watt /meter ( warna ungu ) m 35.000 48,00 1.680.000,00 0,02 - - - - - - - -
- Stop Kontak 1Ph buah 90.000 33,00 2.970.000,00 0,04 - - - - - - - -
- Stop Kontak Lantai 1Ph buah 550.000 2,00 1.100.000,00 0,01 - - - - - - - -
- Saklar Tunggal buah 55.000 11,00 605.000,00 0,01 - - - - - - - -
- Saklar Ganda buah 67.000 29,00 1.943.000,00 0,02 - - - - - - - -
- Instalasi Penerangan Lampu titik 306.000 113,00 34.578.000,00 0,41 113,00 34.578.000,00 0,41 - - 113,00 34.578.000,00 0,41
( NYM 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- Instalasi Penerangan Lampu Signage titik 221.000 4,00 884.000,00 0,01 4,00 884.000,00 0,01 - - 4,00 884.000,00 0,01
( NYM 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- Instalasi Stopkontak titik 309.000 35,00 10.815.000,00 0,13 35,00 10.815.000,00 0,13 - - 35,00 10.815.000,00 0,13
( NYM 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- - - -
b Lantai Dua - - - -
- Lampu DL Panel 10 watt LED buah 168.000 14,00 2.352.000,00 0,03 - - - - - - - -
- Lampu DL Panel 13 watt LED buah 192.000 102,00 19.584.000,00 0,23 - - - - - - - -
LED Strip 5 watt /meter ( warna ungu ) m 35.000 94,00 3.290.000,00 0,04 - - - - - - - -
- Stop Kontak 1Ph buah 90.000 26,00 2.340.000,00 0,03 - - - - - - - -
- Stop Kontak Lantai 1Ph buah 550.000 5,00 2.750.000,00 0,03 - - - - - - - -
- Saklar Tunggal buah 55.000 2,00 110.000,00 0,00 - - - - - - - -
- Saklar Ganda buah 67.000 19,00 1.273.000,00 0,02 - - - - - - - -
- Instalasi Penerangan Lampu titik 306.000 117,00 35.802.000,00 0,43 117,00 35.802.000,00 0,43 - - 117,00 35.802.000,00 0,43
( NYM 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- Instalasi Penerangan Lampu Signage titik 2.582.000 3,00 7.746.000,00 0,09 - - - - - - - -
( NYM 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- Instalasi Stopkontak titik 309.000 31,00 9.579.000,00 0,11 31,00 9.579.000,00 0,11 - - 31,00 9.579.000,00 0,11
( NYM 3 x 2.5 mm, di dalam Conduit PVC high impact ) - - - -
- - - -
1.5 Penangkal Petir - - - -
- Splitzen + dudukan bh 858.000 3,00 2.574.000,00 0,03 - - - - - - - -
- Kabel Grounding ( BC 50 mm ) + pipa conduit m 170.000 64,00 10.880.000,00 0,13 64,00 10.880.000,00 0,13 - - 64,00 10.880.000,00 0,13
- Terminal Grounding bh 101.000 1,00 101.000,00 0,00 1,00 101.000,00 0,00 - - 1,00 101.000,00 0,00
- Grounding sistem unit 5.478.000 1,00 5.478.000,00 0,07 1,00 5.478.000,00 0,07 - - 1,00 5.478.000,00 0,07
- Copper road - - - -
- Pentanahan & pipa GIP dia. 1 1/2 " - - - -
- Bak kontrol ( 40x40) cm lengkap tutup - - - -
Jumlah Harga Pekerjaan Mekanikal Electrical & Plambing III. Electrikal/Arus Kuat 535.802.000,00 6,40 124.417.000,00 1,49 - - 124.417.000,00 1,49
(A) Jumlah Harga Pekerjaan 8.366.509.662,01 100,00 4.645.781.039,79 55,53 247.906.020,09 2,96 4.893.687.059,87 58,49
(B) Pajak Pertambahan Nilai (PPN) = 11% x (A) 920.316.062,82
(C) Jumlah Harga Total Pekerjaan = (A) + (B) 9.286.825.724,84
Pekerjaan Arsitek Pass. Dinding Lt. 2 Pekerjaan Arsitek Pass. Dinding Lt. 2
MASTER SCHEDULE PELAKSANAAN
PENATAAN BANGUNAN DAN LINGKUNGAN
BELANJA MODAL BANGUNAN FASILITAS UMUM (PENATAAN PUJASERA)
DINAS PEKERJAAN UMUM DAN TATA RUANG KABUPATEN MAJALENGKA
100,00
99,07
A PEKERJAAN PERSIAPAN 252.495.468,49 3,018 0,38 0,38 0,38 0,38 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05 0,05
97,92 0,05 0,05
96,08
93,53
B BANGUNAN CREATIVE CENTER
91,52
69,93
0,23 0,23
B.4 PEKERJAAN SANITAIR 37.650.394,10 0,450
65,89
0,15 0,15 0,15 0,15
C BANGUNAN AMPLITHEATER 51.261.985,05 0,613
61,85
48,45
48,97
0,34 0,34 0,34 0,34 0,34 0,34
F AREA SKATEBOARD OUTDOOR 171.817.292,27 2,054 44,89
45,23
42,25
34,02
H.1 PLAMBING
28,68 30,28
0,35 0,35 0,35
- PERALATAN UTAMA AIR BERSIH 86.634.500,00 1,035
0,07 0,07 0,07 0,07
- AIR BERSIH 23.184.000,00 0,277 24,93 26,54
0,31 0,31 0,31 0,31
- AIR KOTOR DAN BEKAS 103.953.200,00 1,242 22,30
22,11 0,21
- AIR HUJAN 17.758.000,00 0,212 19,49
MC-0
H.2 MEKANIKAL
17,67
0,06 0,06 0,06
- TATA UDARA 14.302.000,00 0,171
14,04
H.3 ELEKTRIKAL
9,78
0,80 0,80 0,80 0,80 0,80 0,80 0,80 0,80
- PEKERJAAN ELEKTRIKAL 535.802.000,00 6,404 8,50 10,41
8,32
H.4 ELEKTRONIK
6,24
0,00 0,00
- TATA SUARA 0,000 4,16 2,47
1,46
0,71 0,95
2,08
0,00
- DATA/LAN 0,0000,00% - - -
1,13
0,00% 0,38 0,38 0,75
PROGRES RENCANA 0,38 - 0,38 0,38 0,95 2,08 2,08 2,08 2,08 3,63 3,63 4,43 4,43 3,74 3,74 3,74 3,74 3,74 3,74 4,29 4,29 4,29 4,04 4,04 4,53 3,25 4,31 3,75 3,75 1,99 2,01 2,55 1,84 1,15 0,93
JUMLAH RENCANA KUMULATIF - 0,00% 0,38 0,38 0,75 1,13 2,08 4,16 6,24 8,32 10,41 14,04 17,67 22,11 26,54 30,28 34,02 37,76 41,50 45,23 48,97 53,26 57,55 61,85 65,89 69,93 74,46 77,71 82,02 85,78 89,53 91,52 93,53 96,08 97,92 99,07 100,00
PROGRES REALISASI - - - 0,71 0,24 0,51 1,01 6,03 1,28 9,71 2,81 2,63 3,75 4,88 3,36 1,32 4,00 2,65 3,56 7,08 2,96
JUMLAH REALISASI KUMULATIF - 0,00% - - - 0,71 0,95 1,46 2,47 8,50 9,78 19,49 22,30 24,93 28,68 33,57 36,93 38,25 42,25 44,89 48,45 55,53 58,49
DEVIASI (+/-) - 0,38 - 0,38 - 0,75 - 0,42 - 1,13 - 2,70 - 3,78 0,17 - 0,63 5,45 4,63 2,82 2,14 3,28 2,91 0,49 0,75 - 0,34 - 0,52 2,26 0,94