Anda di halaman 1dari 109

PEMERINTAH KABUPATEN MUNA

DINAS PERPUSTAKAAN DAN KEARSIPAN


Alamat : Jln. Paelangkuta No 71. Raha
Kode pos 93613

[HPS]
[ HASIL PERKIRAAN SNDIRI )

SATKER : DINAS PERPUSTAKAAN DAN KEARSIPAN


PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN
PERPUSTAKAAN (DAK)
LOKASI : KABUPATEN MUNA
SUMBER DANA : DAK (DANA ALOKASI KHUSUS)
TAHUN ANGGARAN : 2022

TAHUN 2022
R E K A P I T U L A S I (HPS)
SATKER : DINAS PERPUSTAKAAN DAN KEARSIPAN
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
LOKASI : KABUPATEN MUNA
TAHUN : 2022

NO. URAIAN PEKERJAAN TOTAL

I PEKERJAAN K3 DAN PEK. PERSIAPAN 66,360,230.50


II. PEKERJAAN STRUKTUR 4,102,255,455.86
III. PEKERJAAN ARSITEKTUR 3,448,326,029.69
IV. PEKERJAAN ME 982,381,101.03
V. PEKERJAAN PLUMBING 246,192,708.09
VI. SARANA DAN PRASARANA 302,065,288.85
JUMLAH I,II,III,S/D VI 9,147,580,814.02
Ppn 11% 1,006,233,889.54
TOTAL 10,153,814,703.56
PEMBULATAN 10,153,814,000.00

TERBILANG : SEPULUH MILIAR SERATUS LIMA PULUH TIGA JUTA DELAPAN RATUS EMPAT BELAS RIBU
RUPIAH

Raha, 4 Februari 2022


PA/PPK
Dinas Perpustakaan dan Kearsipan Daerah
Kabupaten Muna

Dra. MULIATI DITU


Nip. 19631231 199503 2 012
HASIL PERKIRAAN SENDIRI [HPS]
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
UNIT PEKERJAAN : K3 DAN PEK. PERSIAPAN
LOKASI : KABUPATEN MUNA
TAHUN : 2022

HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)

I. PEKERJAAN K3 DAN PEK. PERSIAPAN


Pelaksanaan K3 Konstruksi, termasuk antisipasi penyebaran
wabah Covid 19 di tempat kerja :
1 Penyediaan Helm Kerja Buah 20.00 100,000.00 2,000,000.00
2 Penyediaan Sepatu Lumpur Pasang 20.00 150,000.00 3,000,000.00
3 Penyediaan Masker N95 Buah 20.00 100,000.00 2,000,000.00
4 Penyediaan Sarung Tangan Karet Lateks Pasang 10.00 75,000.00 750,000.00
5 Penyediaan Hand Sanitizer Liter 5.00 200,000.00 1,000,000.00
6 Penyediaan Pengukur Suhu Tubuh Digital Buah 1.00 500,000.00 500,000.00
7 Penyediaan Safety Belt Buah 6.00 125,000.00 750,000.00
8 Penyediaan Peralatan P3K & Obat-Obatan Ls 1.00 500,000.00 500,000.00

II. PEKERJAAN PERSIAPAN


1 Papan Nama Proyek Ls 1.00 300,000.00 300,000.00
2 Pek. Pemasangan Bowplank M1 130.00 73,571.25 9,564,262.50
3 Air & Listrik Kerja Ls 1.00 1,500,000.00 1,500,000.00
4 Pek. Barak Kerja m2 16.00 1,331,165.25 21,298,644.00
6 Pek. Gudang Semen m2 16.00 1,137,332.75 18,197,324.00
5 Administrasi dan Dokumentasi Ls 1.00 5,000,000.00 5,000,000.00
TOTAL PEKERJAAN PERSIAPAN (I) 66,360,230.50
HASIL PERKIRAAN SENDIRI [HPS]

PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)


UNIT PEKERJAAN : ARSITEKTUR
LOKASI : KABUPATEN MUNA
TAHUN : 2022

HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
III PEKERJAAN ARSITEKTUR
A Pekerjaan Tanah dan Pondasi
1 Pek. Urugan Tanah didatangkan (Bawah Lantai ) m3 715.02 178,135.00 127,370,087.70
2 Pek. Urugan Pasir Bawah Lantai m3 23.87 259,785.00 6,200,028.81
3 Pek. Urugan Pasir Bawah Anstamping m3 3.54 259,785.00 919,638.90
4 Pek. Pas. Batu Kosong m3 14.16 551,310.00 7,806,549.60
5 Pek. Pas. Batu Gunung m3 37.52 996,958.00 37,409,851.99
B Pekerjaan Dinding
1 Lantai 01
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 447.56 163,098.98 72,997,231.88
2 Lantai 02 Elev.+ 3.80
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 364.15 163,098.98 59,392,656.67
3 Lantai 03 Elev.+ 7.40
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 483.62 163,098.98 78,877,928.71
4 Topfloor
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 142.39 163,098.98 23,223,272.32
C Pekerjaan Plesteran, Acian & Pengecatan
1 Lantai 01
Plesteran Dinding Camp 1 Ps : 4 Pp m2 895.13 86,150.64 77,115,850.08
Acian Dinding, Kolom dan Balok Luar m2 1,074.28 29,359.50 31,540,411.74
Pengecatan Dinding Dalam & Luar m2 999.21 36,371.05 36,342,244.13
2 Lantai 02
Plesteran Dinding Camp 1 Ps : 4 Pp m2 728.30 86,150.64 62,743,683.41
Acian Dinding, Kolom dan Balok Luar m2 891.83 29,359.50 26,183,594.81
Pengecatan Dinding Dalam & Luar m2 503.74 36,371.05 18,321,589.10
3 Lantai 03
Plesteran Dinding Camp 1 Ps : 4 Pp m2 967.24 86,150.64 83,328,345.03
Acian Dinding, Kolom dan Balok Luar m2 1,130.77 29,359.50 33,198,695.02
Pengecatan Dinding Dalam & Luar m2 623.21 36,371.05 22,666,802.07
4 Top Floor
Plesteran Dinding dan Kolom Praktis m2 304.71 86,150.64 26,250,720.29
Acian Dinding dan Kolom Praktis m2 304.71 29,359.50 8,946,051.04
Pengecatan Dinding Dalam & Luar m2 73.58 36,371.05 2,676,181.86
D Pekerjaan Kusen+daun Pintu jendela dan Ventilasi
1 Lantai 01
a Kusen Alumunium 4' Coathing Powder
J1 Kusen Jendela Type J1 m1 39.28 192,855.00 7,575,344.40
Kaca 5 mm m2 14.72 318,492.50 4,688,209.60
J2 Kusen Jendela Type J2 m1 266.20 192,855.00 51,338,001.00
Kaca 5 mm m2 51.48 318,492.50 16,395,993.90
Duan Jendela Alumunium m1 161.04 210,128.00 33,839,013.12
J6 Kusen Jendela Type J6 m1 5.61 192,855.00 1,081,916.55
Kaca 5 mm m2 1.17 318,492.50 372,636.23
Duan Jendela Alumunium m1 1.34 210,128.00 281,571.52
V1 Kusen Ventilasi Type V1 m1 4.40 192,855.00 848,562.00
Kaca 5 mm m2 0.44 318,492.50 140,136.70
Duan Jendela Alumunium m1 4.20 210,128.00 882,537.60
b Kusen Pintu Kayu Kls I
Kusen Pintu Type P1 m3 0.10 10,836,392.50 1,098,810.20
Kusen Pintu Type P2 m3 0.03 10,836,392.50 345,139.10
Kusen Pintu Type P3 m3 0.06 10,836,392.50 690,278.20
Kusen Pintu Type P5 m3 0.06 10,836,392.50 648,016.27
Pengecatan Kusen m2 13.13 60,287.60 791,757.05
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
c Daun Pintu Panil Kayu Kls I
Daun Pintu Type P1 m2 8.13 1,256,409.50 10,208,578.47
Daun Pintu Type P2 m2 1.82 1,256,409.50 2,287,167.85
Daun Pintu Type P3 m2 3.64 1,256,409.50 4,574,335.71
Daun Pintu Type P5 m2 2.66 1,256,409.50 3,347,074.91
Pengecatan Pintu m2 32.50 60,287.60 1,959,395.23
d Kusen Ventilasi Kayu KLs I
Kusen Ventilasi Type 2 m3 0.11 10,836,392.50 1,239,683.30
Kaca 5 mm Ventilasi type 2 m2 2.40 318,492.50 764,382.00
e Pek. Pintu Kaca Tempered
Pintu Kaca Tempered Type PJ1 Unit 1.00 18,754,051.70 18,754,051.70
Kusen Jendela m1 15.40 192,855.00 2,969,967.00
Kaca 5 mm m2 6.74 318,492.50 2,146,639.45
f Pek. Pintu pvc (P5)
Pintu dan Kusen PVC type P5 Unit 5.00 1,200,000.00 6,000,000.00
2 Lantai 02
a Kusen Alumunium 4' Coathing Powder
J3 Kusen Jendela Type J3 m1 235.84 192,855.00 45,482,923.20
Kaca 5 mm m2 39.60 318,492.50 12,612,303.00
Duan Jendela Alumunium m1 127.60 210,128.00 26,812,332.80
J4 Kusen Jendela Type J4 m1 16.60 192,855.00 3,201,393.00
Kaca 5 mm m2 3.88 318,492.50 1,235,750.90
Duan Jendela Alumunium m1 6.40 210,128.00 1,344,819.20
J5 Kusen Jendela Type J5 m1 68.08 192,855.00 13,129,568.40
Kaca 5 mm m2 21.84 318,492.50 6,955,876.20
J7 Kusen Jendela Type J7 m1 34.50 192,855.00 6,653,497.50
Kaca 5 mm m2 10.08 318,492.50 3,210,404.40
b Kusen Pintu Kayu Kls I
Kusen Pintu Type P1 m3 0.03 10,836,392.50 366,270.07
Kusen Pintu Type P3 m3 0.10 10,836,392.50 1,035,417.30
Kusen Pintu Type P5 m3 0.03 10,836,392.50 324,008.14
Pengecatan Kusen m2 8.67 60,287.60 522,753.78
c Daun Pintu Panil Kayu Kls I
Daun Pintu Type P1 m2 2.71 1,256,409.50 3,402,859.49
Daun Pintu Type P3 m2 5.46 1,256,409.50 6,861,503.56
Daun Pintu Type P5 m2 1.33 1,256,409.50 1,673,537.45
Pengecatan Pintu m2 19.00 60,287.60 1,145,657.32
d Kusen Ventilasi Kayu KLs I
Kusen Ventilasi Type 2 m3 0.09 10,836,392.50 929,762.48
Kaca 5 mm Ventilasi type 2 m2 1.80 318,492.50 573,286.50
f Pek. Pintu pvc P5
Pintu dan Kusen PVC type P5 Unit 4.00 1,200,000.00 4,800,000.00
3 Lantai 03
a Kusen Alumunium 4' Coathing Powder
J3 Kusen Jendela Type J3 m1 128.64 192,855.00 24,808,867.20
Kaca 5 mm m2 21.60 318,492.50 6,879,438.00
Duan Jendela Alumunium m1 69.60 210,128.00 14,624,908.80
J7 Kusen Jendela Type J7 m1 34.50 192,855.00 6,653,497.50
Kaca 5 mm m2 10.08 318,492.50 3,210,404.40
b Kusen Pintu Kayu Kls I
Kusen Pintu Type P1 m3 0.10 10,836,392.50 1,098,810.20
Kusen Pintu Type P2 m3 0.16 10,836,392.50 1,725,695.51
Kusen Pintu Type P3 m3 0.10 10,836,392.50 1,035,417.30
Kusen Pintu Type P5 m3 0.03 10,836,392.50 324,008.14
Pengecatan Kusen m2 17.20 60,287.60 1,037,187.87
c Daun Pintu Panil Kayu Kls I
Daun Pintu Type P1 m2 8.13 1,256,409.50 10,208,578.47
Daun Pintu Type P2 m2 9.10 1,256,409.50 11,435,839.27
Daun Pintu Type P3 m2 5.46 1,256,409.50 6,861,503.56
Daun Pintu Type P5 m2 1.33 1,256,409.50 1,673,537.45
Pengecatan Pintu m2 48.04 60,287.60 2,896,264.53
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
d Kusen Ventilasi Kayu KLs I
Kusen Ventilasi Type 2 m3 0.10 10,836,392.50 1,084,722.89
Kaca 5 mm Ventilasi type 2 m2 2.10 318,492.50 668,834.25
f Pek. Pintu pvc P5
Pintu dan Kusen PVC type P5 Unit 4.00 1,200,000.00 4,800,000.00
E Pekerjaan Besi dan ACP
1 Pek. Pasangan ACP (Kanopi Teras Entrance)
Rangka Besi Hollo 60x120 M2 114.35 208,380.00 23,827,211.10
Pas. ACP M2 114.35 166,140.50 18,997,335.47
2 Pek. Pasangan ACP (Cover Kolom Entrance)
Rangka Besi Hollo M2 16.70 208,380.00 3,480,779.52
Pas. ACP M2 17.40 166,140.50 2,890,844.70
3 Pek. Pasangan ACP (Kanopi Teras Samping)
Rangka Besi Hollo 60x120 M2 33.75 208,380.00 7,032,825.00
Pas. ACP M2 33.75 166,140.50 5,607,241.88
4
Rangka Besi Hollo 60x120 M2 124.37 208,380.00 25,915,970.54
Pas. ACP M2 124.37 166,140.50 20,662,694.62
Pas. ACP + Laser Cutting M2 82.80 473,190.50 39,180,173.40
5 Pas. ACP Sisi Depan(Cover kolom & Dinding )
Cover Kolom & Topi
Rangka Besi Hollo 60x120 M2 245.04 208,380.00 51,061,435.20
Pas. ACP M2 245.04 166,140.50 40,711,068.12
Cover Dinding
Rangka Besi Hollo 60x120 M2 38.96 208,380.00 8,118,484.80
Pas. ACP M2 38.96 166,140.50 6,472,833.88
Pas. ACP + Laser Cutting M2 73.16 473,190.50 34,618,616.98
Panel Jari-jari 40.40.10 cm
Rangka Besi Hollo 60x120 M2 39.20 208,380.00 8,168,496.00
Pas. ACP M2 39.20 166,140.50 6,512,707.60
6 Pas. ACP Sisi Belakang (Cover kolom & Dinding )
Cover Kolom
Rangka Besi Hollo 60x120 M2 75.49 208,380.00 15,729,772.68
Pas. ACP M2 75.49 166,140.50 12,541,281.78
Cover Dinding
Rangka Besi Hollo 60x120 M2 133.97 208,380.00 27,915,626.70
Pas. ACP M2 133.97 166,140.50 22,257,012.08
Pas. ACP + Laser Cutting M2 35.50 473,190.50 16,798,262.75
7 Pas. ACP Sisi Kanan (Cover kolom & Dinding )
Cover Kolom
Rangka Besi Hollo 60x120 M2 137.20 208,380.00 28,589,944.38
Pas. ACP M2 137.20 166,140.50 22,794,642.74
Cover Dinding
Rangka Besi Hollo 60x120 M2 83.04 208,380.00 17,303,875.20
Pas. ACP M2 83.04 166,140.50 13,796,307.12
Pas. ACP + Laser Cutting M2 35.50 473,190.50 16,798,262.75
8 Pas. ACP Sisi Layar Depan & Belakang
Penutup Layar
Rangka Besi Hollo 60x120 M2 64.76 208,380.00 13,494,688.80
Pas. ACP M2 64.76 166,140.50 10,759,258.78
Cover Dinding Bawah Layar
Rangka Besi Hollo 60x120 M2 59.12 208,380.00 12,319,425.60
Pas. ACP M2 59.12 166,140.50 9,822,226.36
9 Pekerjaan Raillig Tangga Utama Besi Hollow M2 12.04 702,245.43 8,455,034.96
10 Pekerjaan Raillig Tangga Lt. 02 Besi Hollow M2 11.10 702,245.43 7,794,924.25
11 Pekerjaan Railling Void Lt. Mezanin Besi Hollow M2 9.90 702,245.43 6,952,229.74
12 Pekerjaan Railling Void Lt. 02 Besi Hollow M2 21.00 702,245.43 14,747,154.00
13 Pekerjaan Railling Void Lt. 03 Besi Hollow M2 18.00 702,245.43 12,640,417.71
14 Pekerjaan Railling Jalur Disabilitas Besi Hollow M2 12.98 702,245.43 9,111,634.43
15 Pek. Pas. Huruf Identitas Bangunan
Perpustakaan Daerah + Logo cm 1,511.00 8,358.34 12,629,457.41
Kabupaten Muna + logo cm 1,032.00 8,358.34 8,625,810.75
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
F Pekerjaan Atap Dan Kuda-kuda Baja
1 Pek. Rangka kuda Baja WF dan Atap (A1)
Pemasangan Angkur Besi Dia 10 mm bh 48.00 21,494.08 1,031,715.60
Plat Dudukan Kuda-kuda bh 12.00 68,931.00 827,172.00
1 set Aksesoris Perlengkapan Kuda-kuda Set 3.00 439,087.25 1,317,261.75
Pas. Rangka kuda-kuda Baja WF 175.90 kg 2,892.69 42,515.50 122,984,083.75
Pas. Gording Besi Profil C kg 1,058.13 41,986.50 44,427,315.20
Pek. Pengecatan Baja WF dan Profil C m2 221.22 43,935.75 9,719,273.30
Pas. Baut Sambungan Gording titik 85.33 42,481.00 3,625,045.33
Pas. Atap Onduline m2 408.00 163,627.75 66,760,122.00
Pas. Nok Atap m1 16.00 206,747.00 3,307,952.00
Pas. Lisplank m1 51.00 89,412.50 4,560,037.50
2 Pek. Pas. Kuda-kuda dan Atap (A2)
Pas. Rangka Baja Ringan M2 240.07 268,571.00 64,476,914.25
Pas. Atap Metal M2 120.04 127,477.50 15,302,016.67
3 Pek. Pas. Kuda-kuda dan Atap (A3)
Pas. Rangka Baja Ringan M2 44.00 268,571.00 11,817,124.00
Pas. Atap Metal M2 44.00 127,477.50 5,609,010.00
4 Pek. Pas. Kuda-kuda dan Atap (A4)
Pas. Rangka Baja Ringan M2 45.58 268,571.00 12,242,003.32
Pas. Atap Metal M2 45.58 127,477.50 5,810,679.41
G Pekerjaan Plafond dan Rangka
1 Pek. Rangka dan Plafon Lt. 01
a Entrance
Pas. Rangka balok kayu 5/7 M2 55.69 137,303.10 7,645,723.12
Pas. Plafond Kayu Papan Kls I M2 56.00 304,508.50 17,052,476.00
Pek. Pengecatan Dengan Vernis M2 55.69 58,513.15 3,258,304.76
b Entrance Sisi Dalam
Pas. Rangka Plafond Besi Hollow M2 15.60 233,085.83 3,636,139.00
Pas. Plafond Gypsum M2 15.60 67,891.40 1,059,105.84
Pek. Pengecatan M2 15.60 96,441.30 1,504,484.28
d Lavatory
Pas. Rangka balok kayu 5/7 M2 30.00 137,303.10 4,119,093.00
Pas. Plafond Kayu Papan M2 30.00 304,508.50 9,135,255.00
Pek. Pengecatan Dengan Vernis M2 30.00 58,513.15 1,755,394.50
e R. Baca
Pas. Rangka Plafond Besi Hollow M2 104.73 233,085.83 24,411,079.33
Pas. Plafond Gypsum M2 104.73 67,891.40 7,110,266.32
Pek. Pengecatan M2 104.73 96,441.30 10,100,297.35
f R. Baca/Interaksi Anak
Pas. Rangka Plafond Besi Hollow M2 84.16 233,085.83 19,617,202.99
Pas. Plafond Gypsum M2 84.16 67,891.40 5,713,943.90
Pek. Pengecatan M2 84.16 96,441.30 8,116,789.13
g Sekasar
Pas. Rangka Plafond Besi Hollow M2 45.29 233,085.83 10,556,457.39
Pas. Plafond Gypsum M2 45.29 67,891.40 3,074,801.51
Pek. Pengecatan M2 45.29 96,441.30 4,367,826.48
h Mushala
Pas. Rangka Plafond Besi Hollow M2 16.35 233,085.83 3,810,953.38
Pas. Plafond Gypsum M2 16.35 67,891.40 1,110,024.39
Pek. Pengecatan M2 16.35 96,441.30 1,576,815.26
i R. Sortir Buku dan R. Server
Pas. Rangka Plafond Besi Hollow M2 23.00 233,085.83 5,360,974.17
Pas. Plafond Gypsum M2 23.00 67,891.40 1,561,502.20
Pek. Pengecatan M2 23.00 96,441.30 2,218,149.90
j R. Baca Digital
Pas. Rangka Plafond Besi Hollow M2 55.33 233,085.83 12,896,639.16
Pas. Plafond Gypsum M2 55.33 67,891.40 3,756,431.16
Pek. Pengecatan M2 55.33 96,441.30 5,336,097.13
2 Pek. Rangka dan Plafond Lt. 02
a Lantai Mezanin
Pas. Rangka balok kayu 5/7 M2 51.88 137,303.10 7,122,598.31
Pas. Plafond Kayu Papan Kls I M2 51.88 304,508.50 15,796,378.44
Pek. Pengecatan Dengan Vernis M2 51.88 58,513.15 3,035,369.66
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
b Lavatory
Pas. Rangka balok kayu 5/7 M2 30.00 137,303.10 4,119,093.00
Pas. Plafond Lambrisering M2 30.00 304,508.50 9,135,255.00
Pek. Pengecatan Dengan Vernis M2 30.00 58,513.15 1,755,394.50
c R. Baca
Pas. Rangka Plafond Besi Hollow M2 159.81 233,085.83 37,249,447.03
Pas. Plafond Gypsum M2 159.81 67,891.40 10,849,724.63
Pek. Pengecatan M2 159.81 96,441.30 15,412,284.15
d R. Auditorium
Pas. Rangka Plafond Besi Hollow M2 101.51 233,085.83 23,661,242.20
Pas. Plafond Gypsum M2 101.51 67,891.40 6,891,859.69
Pek. Pengecatan M2 101.51 96,441.30 9,790,045.69
e Selasar hall
Pas. Rangka Plafond Besi Hollow M2 63.33 233,085.83 14,761,325.83
Pas. Plafond Gypsum M2 63.33 67,891.40 4,299,562.36
Pek. Pengecatan M2 63.33 96,441.30 6,107,627.53
3 Pek. Rangka dan Plafond Lt. 03
a Selasar hall
Pas. Rangka Plafond Besi Hollow M2 124.99 233,085.83 29,133,398.31
Pas. Plafond Gypsum M2 124.99 67,891.40 8,485,746.09
Pek. Pengecatan M2 124.99 96,441.30 12,054,198.09
b Void
Pas. Rangka balok kayu 5/7 M2 117.78 137,303.10 16,171,559.12
Pas. Plafond Gypsum M2 56.42 67,891.40 3,830,432.79
Pek. Pengecatan M2 56.42 96,441.30 5,441,218.15
Pas. Plafond Lambrisering M2 69.61 304,508.50 21,196,836.69
Pek. Pengecatan Dengan Vernis M2 69.61 58,513.15 4,073,100.37
c R. Rapat
Pas. Rangka Plafond Besi Hollow M2 50.33 233,085.83 11,731,209.99
Pas. Plafond Gypsum M2 50.33 67,891.40 3,416,974.16
Pek. Pengecatan M2 50.33 96,441.30 4,853,890.63
d R. Kadis
Pas. Rangka Plafond Besi Hollow M2 50.17 233,085.83 11,693,450.09
Pas. Plafond Gypsum M2 50.17 67,891.40 3,405,975.76
Pek. Pengecatan M2 50.17 96,441.30 4,838,267.14
e R. Sekretaris
Pas. Rangka Plafond Besi Hollow M2 25.08 233,085.83 5,846,725.04
Pas. Plafond Gypsum M2 25.08 67,891.40 1,702,987.88
Pek. Pengecatan M2 25.08 96,441.30 2,419,133.57
f R. Kabid
Pas. Rangka Plafond Besi Hollow M2 25.08 233,085.83 5,846,725.04
Pas. Plafond Gypsum M2 25.08 67,891.40 1,702,987.88
Pek. Pengecatan M2 25.08 96,441.30 2,419,133.57
g R. Bendahara & staf
Pas. Rangka Plafond Besi Hollow M2 41.76 233,085.83 9,733,664.40
Pas. Plafond Gypsum M2 41.76 67,891.40 2,835,144.86
Pek. Pengecatan M2 41.76 96,441.30 4,027,388.69
h Lavatory
Pas. Rangka balok kayu 5/7 M2 18.00 137,303.10 2,471,455.80
Pas. Plafond Kayu Papan M2 18.00 304,508.50 5,481,153.00
Pek. Pengecatan Plitur M2 18.00 58,513.15 1,053,236.70
H Pekerjaan Penutup lantai
1 Lantai 01
Teras Entrance
Pas. Granito 60x60 (warna cream) m2 37.69 348,477.60 13,134,120.74
Pas. Granit 10x60 (warna abu-abu) m2 3.54 348,477.60 1,233,610.70
Tangga Teras Entrance
Pas. Keramik 30x60 (warna Abu-abu) m2 27.80 259,352.60 7,211,039.69
Pas. Keramik 18x60 (warna abu-abu) m2 33.22 259,352.60 8,615,434.02
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
Tangga Utama
Pas. Granit 30x60 (warna Cream) m2 5.10 348,477.60 1,777,235.76
Pas. Granit 18x60 (warna cream) m2 3.06 348,477.60 1,066,341.46
Pas. Granito Bordes 60x60 (warna cream) m2 2.89 348,477.60 1,007,100.26
Ruang Lobby
Pas. Granito 60x60 (Cream) m2 56.70 348,477.60 19,758,679.92
Pas. Granit 60x60 (Hitam) m2 23.05 348,477.60 8,032,408.68
Plint 10x60 (hitam) m1 12.71 67,488.33 857,776.61
Ruang Baca
Pas. Granito 60x60 (Cream) m2 120.74 348,477.60 42,075,185.42
Plint 10x60 (Cream) m1 35.95 67,488.33 2,426,205.28
Selasar
Pas. Granito 60x60 (Cream) m2 117.19 348,477.60 40,838,089.94
Plint 10x60 (Cream) m1 49.00 67,488.33 3,306,927.93
Ruang Baca Anak
Pas. Granito 60x60 (Cream) m2 75.42 348,477.60 26,282,180.59
Plint 10x60 (Cream) m1 30.44 67,488.33 2,054,344.61
Mushalla
Pas. Granito 60x60 (Cream) m2 16.52 348,477.60 5,756,849.95
Plint 10x60 (Cream) m1 15.00 67,488.33 1,012,324.88
Ruang Sortir buku & R. server
Pas. Granito 60x60 (Cream) m2 23.32 348,477.60 8,126,497.63
Plint 10x60 (Cream) m1 20.00 67,488.33 1,349,766.50
Lavatory
Lav. Pria
Pas. Keramik Lantai 20x20 (Putih) m2 14.62 259,636.65 3,795,887.82
Pas. Keramik dinding 20x20 (Putih) m2 33.75 306,895.90 10,356,202.15
Lav. Wanita
Pas. Keramik Lantai 20x20 (Putih) m2 14.82 259,636.65 3,847,815.15
Pas. Keramik dinding 20x20 (Putih) m2 33.75 306,895.90 10,356,202.15
2 Lantai 02
Hall
Pas. Granito 60x60 (Cream) m2 64.89 348,477.60 22,612,711.46
Plint 10x60 (Cream) m1 17.80 67,488.33 1,201,292.19
Auditorium
Pas. Granito 60x60 (Cream) m2 97.34 348,477.60 33,920,809.58
Plint 10x60 (Cream) m1 40.00 67,488.33 2,699,533.00
R. Baca
Pas. Granito 60x60 (Cream) m2 155.82 348,477.60 54,299,779.63
Plint 10x60 (Cream) m1 45.00 67,488.33 3,036,974.63
R. baca LT. Mezanin
Pas. Granito 60x60 (Cream) m2 70.00 348,477.60 24,393,432.00
Plint 10x60 (Cream) m1 25.00 67,488.33 1,687,208.13
Tangga Ke-LT. 03
Pas. Granit 30x60 (warna Cream) m2 2.40 348,477.60 836,346.24
Pas. Granit 18x60 (warna cream) m2 1.62 348,477.60 564,533.71
Pas. Granito Bordes 60x60 (warna cream) m2 2.26 348,477.60 787,559.38
Tangga ke Lantai mezanin
Pas. Granit 30x60 (warna Cream) m2 2.25 348,477.60 784,074.60
Pas. Granit 18x60 (warna cream) m2 1.62 348,477.60 564,533.71
Lavatory
Lav. Pria
Pas. Keramik Lantai 20x20 m2 14.34 259,636.65 3,723,189.56
Pas. Keramik dinding 20x20 m2 33.75 306,895.90 10,356,202.15
Lav. Wanita
Pas. Keramik Lantai 20x20 m2 14.82 259,636.65 3,847,815.15
Pas. Keramik dinding 20x20 m2 33.75 306,895.90 10,356,202.15
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
3 Lantai 03
Hall dan selasar
Pas. Granito 60x60 (Cream) m2 117.69 348,477.60 41,012,328.74
Plint 10x60 (Cream) m1 72.00 67,488.33 4,859,159.40
R. Rapat
Pas. Granito 60x60 (Cream) m2 48.11 348,477.60 16,765,257.34
Plint 10x60 (Cream) m1 38.80 67,488.33 2,618,547.01
R. Kadis
Pas. Granito 60x60 (Cream) m2 47.28 348,477.60 16,476,020.93
Plint 10x60 (Cream) m1 48.50 67,488.33 3,273,183.76
R. Sekretaris
Pas. Granito 60x60 (Cream) m2 23.64 348,477.60 8,238,010.46
Plint 10x60 (Cream) m1 18.00 67,488.33 1,214,789.85
R. Kabid
Pas. Granito 60x60 (Cream) m2 23.64 348,477.60 8,238,010.46
Plint 10x60 (Cream) m1 18.20 67,488.33 1,228,287.52
R. Bendahara
Pas. Granito 60x60 (Cream) m2 13.92 348,477.60 4,850,808.19
Plint 10x60 (Cream) m1 14.00 67,488.33 944,836.55
R. Staf
Pas. Granito 60x60 (Cream) m2 27.84 348,477.60 9,701,616.38
Plint 10x60 (Cream) m1 28.00 67,488.33 1,889,673.10
Lavatory
Lav. Pria
Pas. Keramik Lantai 20x20 m2 1.00 259,636.65 259,636.65
Pas. Keramik dinding 20x20 m2 1.00 306,895.90 306,895.90
Lav. Wanita
Pas. Keramik Lantai 20x20 m2 1.00 259,636.65 259,636.65
Pas. Keramik dinding 20x20 m2 1.00 306,895.90 306,895.90
Balkon
Pas. Keramik Lantai 20x20 m2 5.60 259,636.65 1,453,965.24
I Pekerjaan Sanitasi
1 Lantai 01 (Lavatory)
Pas. Closed Duduk bh 4.00 6,377,785.00 25,511,140.00
Pas. Urinoir bh 3.00 3,620,246.00 10,860,738.00
Pas. Wastafel bh 4.00 1,093,121.00 4,372,484.00
Pas. krain Air1 1/2" bh 12.00 152,605.00 1,831,260.00
2 Lantai 02 (Lavatory)
Pas. Closed Duduk bh 4.00 6,377,785.00 25,511,140.00
Pas. Urinoir bh 3.00 3,620,246.00 10,860,738.00
Pas. Wastafel bh 4.00 1,093,121.00 4,372,484.00
Pas. krain Air1 1/2" bh 12.00 152,605.00 1,831,260.00
3 Lantai 03 (Lavatory)
Pas. Closed Duduk bh 4.00 6,377,785.00 25,511,140.00
Pas. Urinoir bh 3.00 3,620,246.00 10,860,738.00
Pas. Wastafel bh 4.00 1,093,121.00 4,372,484.00
Pas. krain Air1 1/2" bh 12.00 152,605.00 1,831,260.00

TOTAL PEKERJAAN ARSITEKTUR (III) 3,448,326,029.69


HASIL PERKIRAAN SENDIRI [HPS]
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
UNIT PEKERJAAN : STRUKTUR
LOKASI : KABUPATEN MUNA
TAHUN : 2022

HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
II. PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI DAN BETON
1 Tiang Pancang Mini Pile Mutu Beton K-450 Uk 30.30
Mobilisasi & Demobilisasi Peralatan Pancang Ls 1.00 20,000,000.00 20,000,000.00
Pengadaan Tiang Pancang Uk. 30.30 Panjang 4 m (tiba di site) m' 1,415.91 829,500.00 1,174,497,345.00
Handling tiang pancang di site btg 327.00 100,000.00 32,700,000.00
Pemancangan Tiang m' 1,415.91 148,915.47 210,850,898.17
Penyambungan Tiang titik 238.00 50,000.00 11,900,000.00
Potong Kepala Tiang titik 119.00 50,000.00 5,950,000.00
2 PEKERJAAN FOOT PLAT
Pondasi Foot Plat Tipe P1 ( 9 titik)
Galian Tanah m3 10.58 99,187.50 1,049,800.50
Urugan Pasir Bawah Foot Plat, t= 10 cm m3 0.88 259,785.00 229,130.37
Lantai Kerja, Beton K.100, t = 5 cm m3 1.76 1,189,230.03 2,097,801.78
Beton K-300 m3 10.06 1,477,996.46 14,874,925.83
Besi Beton, U - 42 Kg 1,775.55 34,165.35 60,662,382.72
Bekesting m2 44.28 102,028.00 4,517,799.84
Poor Pondasi Tipe P2 ( 17 titik)
Galian Tanah m3 17.14 99,187.50 1,699,677.00
Urugan Pasir Bawah Foot Plat, t= 10 cm m3 1.43 259,785.00 370,972.98
Lantai Kerja, Beton K.100, t = 5 cm m3 2.86 1,189,230.03 3,396,440.97
Beton K-300 m3 16.87 1,477,996.46 24,931,213.72
Besi Beton, U - 42 Kg 2,995.98 34,165.35 102,358,783.33
Bekesting m2 78.29 102,028.00 7,987,261.98
Poor Pondasi Tipe P3 ( 9 titik)
Galian Tanah m3 14.17 99,187.50 1,405,288.50
Urugan Pasir Bawah Foot Plat, t= 10 cm m3 0.62 259,785.00 160,027.56
Lantai Kerja, Beton K.100, t = 5 cm m3 1.23 1,189,230.03 1,465,131.40
Beton K-300 m3 8.14 1,477,996.46 12,034,955.64
Besi Beton, U - 42 Kg 1,476.24 34,165.35 50,436,144.90
Bekesting m2 48.18 102,028.00 4,915,709.04
B PEKERJAAN STRUKTUR LT. 01
1 PEKERJAAN SLOEF
Pek. Sloef Beton 25/40
Pek. Beton K.275 M3 24.72 1,466,687.99 36,250,660.25
Besi Beton, U - 42 Kg 5,224.40 34,165.35 178,493,546.57
Bekesting Sloef m2 197.73 106,699.88 21,097,552.88
Pek. Sloef Beton 15/20
Pek. Beton K.275 M3 1.53 1,466,687.99 2,240,072.56
Besi Beton, U - 42 Kg 299.40 18,467.85 5,529,211.85
Bekesting Sloef m2 10.38 106,699.88 1,107,758.10
2 PEKERJAAN KOLOM
Pek. Kolom K1 Lt. 01 Uk 45.45 (1 Titik)
Pek. Beton K.300 M3 1.00 1,477,996.46 1,477,996.46
Besi Beton, U - 42 Kg 149.92 18,467.85 2,768,645.35
Bekesting Kolom m2 7.20 380,644.25 2,740,638.60
3 Pek. Kolom K2 Lt. 01 Uk 50.40(35 Titik)
Pek. Beton K.300 M3 27.60 1,477,996.46 40,792,702.18
Besi Beton, U - 42 Kg 4,137.71 18,467.85 76,414,611.73
Bekesting Kolom m2 241.28 380,644.25 91,839,941.42
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
4 Pek. Kolom K3 Lt. 01 Uk 20.20 (Entrance, tangga lt.01)
Pek. Beton K.300 M3 0.18 1,477,996.46 260,127.38
Besi Beton, U - 42 Kg 136.85 18,467.85 2,527,300.16
Bekesting Kolom m2 3.52 380,644.25 1,339,867.76
5 Pek. Kolom Praktis m1 133.20 187,809.61 25,016,239.39
6 Pekerjaan Ring Balok 10X15 m1 11.62 193,553.05 2,249,086.44
7 Pekerjaan Tangga
Tangga Utama (LT.01)
Beton K 275 M3 2.08 1,466,687.99 3,044,621.32
Besi Kg 311.38 18,467.85 5,750,467.42
Bekesting Tangga m2 17.38 361,669.25 6,286,679.57
8 Pekerjaan Tangga
Tangga Entrance (LT.01)
Beton K 275 M3 5.57 1,466,687.99 8,169,452.08
Besi Kg 557.00 18,467.85 10,286,592.45
Bekesting Tangga M3 72.60 180,834.63 13,128,593.78
9 Pek. Ram Jalur Disabilitas
Rabat Beton K 100 M3 2.67 1,189,230.03 3,176,136.11
C PEKERJAAN STRUKTUR LT. 02
1 Pek. Balok B2 Lt. 02 Uk 25.40 (Elev. 4.00)
Pek. Beton K.275 M3 20.60 1,466,687.99 30,213,772.51
Besi Beton, U - 42 Kg 3,444.18 34,165.35 117,671,706.27
Bekesting Balok M2 166.86 386,250.50 64,449,758.43
2 Pek. Balok B1 Lt. Mezanin Uk 25.50 (Elev. 5.00)
Pek. Beton K.275 M3 2.81 1,466,687.99 4,115,893.16
Besi Beton, U - 42 Kg 469.19 34,165.35 16,029,913.87
Bekesting Balok M2 22.67 386,250.50 8,758,036.96
3 Pek. Balok BA1 Lt. 02 Uk 20.30 (Elev. 4.00)
Pek. Beton K.275 M3 4.97 1,466,687.99 7,286,505.91
Besi Beton, U - 42 Kg 993.60 34,165.35 33,946,691.76
Bekesting Balok M2 46.37 386,250.50 17,909,663.18
4 Pek. Balok BA1 Lt. Mezanin Uk 20.30 (Elev. 5.00)
Pek. Beton K.275 M3 4.65 1,466,687.99 6,821,859.16
Besi Beton, U - 42 Kg 930.24 34,165.35 31,781,975.18
Bekesting Balok M2 24.82 386,250.50 9,586,428.41
5 Pek. Balok Latei 8x45 ( Lt. Mezanin dan Void)
Pek. Beton K.275 M3 1.83 1,466,687.99 2,676,998.91
Besi Beton Polos Kg 182.52 34,165.35 6,235,859.68
Bekesting Balok M2 3.65 386,250.50 1,409,968.83
6 Pek. Plat Beton Lantai. 02 (ELV +4.00 dan 5.00)
Beton K 275 + Bondek+ Wiremesh M3 34.61 4,338,867.20 150,175,135.98
7 Pek. Kolom K1 Lt. 02 Uk 45.45 cm (1 titik)
Pek. Beton K.300 M3 0.68 1,477,996.46 1,011,614.67
Besi Beton, U - 42 Kg 102.61 34,165.35 3,505,731.03
Bekesting Kolom M2 6.08 380,644.25 2,315,839.62
8 Pek. Kolom K2 Lt. 02 Uk 50.40 cm (34 Titik)
Pek. Beton K.300 M3 22.98 1,477,996.46 33,970,270.54
Besi Beton, U - 42 Kg 3,445.69 34,165.35 117,723,313.46
Bekesting Kolom M2 199.73 380,644.25 76,026,456.70
9 Pek. Kolom Praktis 10.10
Lantai 02 m1 114.70 187,809.61 21,541,761.69
10 Pekerjaan Tangga
Tangga dari LT.02 ke LT. 03
Beton K 275 M3 1.11 1,466,687.99 1,625,090.29
Besi Kg 121.88 18,467.85 2,250,861.56
Bekesting Tangga M2 10.30 361,669.25 3,725,193.28
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
D PEKERJAAN STRUKTUR LT. 03
1 Pek. Balok B2 Lt. 03 Uk 25.40 (Elev. 7.50)
Beton K 275 M3 20.07 1,466,687.99 29,436,427.87
Besi Beton, U - 42 Kg 3,355.57 34,165.35 114,644,230.33
Bekesting Balok M2 162.57 386,250.50 62,791,585.03
2 Pek. Balok B1 Lt. Mezanin Uk 25.50 (Elev. 10.00)
Beton K 275 M3 1.63 1,466,687.99 2,383,367.98
Besi Beton, U - 42 Kg 358.25 34,165.35 12,239,704.10
Bekesting Balok M2 13.13 386,250.50 5,071,469.07
3 Pek. Balok B2 Lt. Mezanin Uk 25.40 (Elev. 10.00)
Beton K 275 M3 2.03 1,466,687.99 2,970,043.17
Besi Beton, U - 42 Kg 446.43 34,165.35 15,252,554.34
Bekesting Balok M2 14.38 386,250.50 5,553,316.56
4 Pek. Balok B3 Lt. Mezanin Uk 25.35 (Elev. 10.00)
Beton K 275 M3 0.80 1,466,687.99 1,167,850.31
Besi Beton, U - 42 Kg 175.54 34,165.35 5,997,455.01
Bekesting Balok M2 6.46 386,250.50 2,495,564.48
5 Pek. Balok BA1 Lt. 03 Uk 20.30 (Elev. 7.50 & 10.00)
Beton K 275 M3 6.91 1,466,687.99 10,139,507.38
Besi Beton, U - 42 Kg 1,524.09 34,165.35 52,071,090.69
Bekesting Balok M2 64.52 386,250.50 24,922,118.26
6 Pek. Balok Latei 8x45 ( Lt. Mezanin dan Void)
Beton K 275 M3 1.03 1,466,687.99 1,515,382.03
Besi Beton Polos Kg 103.32 34,165.35 3,529,963.96
Bekesting Balok M2 2.07 386,250.50 798,148.03
7 Pek. Plat Beton Lantai. 03
Beton K 275 + Bondek+ Wiremesh M3 32.03 4,338,867.20 138,976,519.74
8 Pek. Kolom K1 Lt. 03 Uk 45.45 (1 Titik)
Pek. Beton K.300 M3 0.68 1,477,996.46 1,011,614.67
Besi Beton, U - 42 Kg 102.61 34,165.35 3,505,731.03
Bekesting Kolom M2 6.08 380,644.25 2,315,839.62
9 Pek. Kolom K2 Lt. 03 Uk 50.40 (32 Titik)
Pek. Beton K.300 M3 17.04 1,477,996.46 25,177,965.23
Besi Beton, U - 42 Kg 2,553.87 34,165.35 87,253,749.98
Bekesting Kolom M2 165.81 380,644.25 63,113,100.52
10 Pek. Kolom Praktis 10.10
Lantai 03 m1 122.85 187,809.61 23,072,409.97
E PEKERJAAN STRUKTUR LT. TOP FLOOR
BALOK Elev +11,00
1 Pek. Balok B3 Uk 25.35 (Elev. 11.00)
Beton K 275 M3 24.03 1,466,687.99 35,245,978.98
Besi Beton, U - 42 Kg 4,017.82 34,165.35 137,270,328.81
Bekesting Balok M2 194.99 386,250.50 75,316,684.50
2 Pek. Balok BA1 Uk 25.30 (Elev. 11.00)
Beton K 275 M3 4.33 1,466,687.99 6,356,992.40
Besi Beton, U - 42 Kg 724.66 34,165.35 24,758,184.12
Bekesting Balok M2 35.25 386,250.50 13,616,064.00
3 Pek. Plat Beton Deck Atap
Beton K 275 + Bondek+ Wiremesh M3 4.40 4,338,867.20 19,091,102.46
4 Pek. Plat Beton Elv + 11.00 (Talang Air Hujan)
Beton K 275 M3 2.58 1,466,687.99 3,784,055.00
Besi Kg 154.80 18,467.85 2,858,823.18
Bekesting Plat M2 42.00 199,450.25 8,376,910.50
5 Pek. Plat Beton Elv + 10.00 (Talang Air Hujan Lt. Mezanin)
Beton K 275 M3 1.49 1,466,687.99 2,188,327.81
Besi Kg 164.12 18,467.85 3,030,984.17
Bekesting Plat M3 15.10 199,450.25 3,012,576.36
6 Pek. Kolom Praktis 10.10
Lantai TOP m1 25.00 187,809.61 4,695,240.13
TOTAL PEKERJAAN STRUKTUR (II) 4,102,255,455.86
HASIL PERKIRAAN SENDIRI [HPS]
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
UNIT PEKERJAAN : ME
LOKASI : KABUPATEN MUNA
TAHUN : 2022

HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)
IV PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING GEDUNG
A PEKERJAAN LISTRIK ARUS MENENGAH
Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis
A.1 Pekerjaan Panel-panel (PP)
A.1.1 Ruang Panel Utama
1 Panel LVMDP unit 1 132,128,100 132,128,100
2 Kapasitor Bank 600 KVAR / 415 V unit 1 44,714,300 44,714,300
3 PKG (Panel Kontrol Genset) unit 1 4,000,000 4,000,000
4 PP-AC unit 1 5,565,138 5,565,138
5 PP-STP unit 1 4,047,138 4,047,138
6 PP-SDP unit 1 5,565,138 5,565,138
A.1.2 Lantai 01
1 PP-SDP unit 1 7,953,400 7,953,400
2 PP-STP unit 1 7,953,400 7,953,400
3 PP- 1 unit 1 7,953,400 7,953,400
A.1.3 Lantai 02
1 PP- SDP unit 1 8,286,900 8,286,900
2 PP. AC unit 1 9,206,900 9,206,900
3 PP- SK unit 1 8,286,900 8,286,900
A.1.4 Lantai 03
1 PP- 1 unit 1 7,953,400 7,953,400
2 PP.AC-1 unit 1 8,637,650 8,637,650
3 SDP-1 unit 1 8,350,150 8,350,150
A.1.5 Lantai Atap
1 PP-OBS ( Obstruction) unit 1 9,000,000 9,000,000
2 PP-Booster Pump unit 1 4,000,000 4,000,000
A.1.6 Pekerjaan Kabel-Kabel Utama
1.6.1 Kabel dari LVMDP ke
1 SDP 1 NYY 2 ( 4 x 1 x 120 ) mm2 m' 5 3,880,445 19,402,225
2 PP- AC NYY 4 x 16 mm2 m' 5 171,465 857,325
3 PP – Booster PumNYY 4 x 4 mm2 m' 5 42,895 214,475
4 PP – PressuruzedFRC 4 x 1 x 6 mm2 m' 5 365,930 1,829,650
1.6.2 Kabel dari SDP -1 ke PP LT.01
1 PP - 1 NYY 4 x 6 mm2 m' 12 54,395 652,740
2 PP -P1 NYA2 4 x 25 mm2 m' 539 26,795 14,442,505
3 PP-SK 1 NYA2 4 x 16 mm2 m' 355 43,470 15,431,850
4 PP-2 NYY 4 x 70 mm2 m' 12 745,545 8,946,540
1.6.3 Kabel dari SDP -2 ke PP LT.02
1 PP - 2 NYY 4 x 6 mm2 m' 24 54,395 1,305,480
2 PP -P2 NYA2 4 x 25 mm2 m' 210.6 26,795 5,643,295
3 PP-SK2 NYA2 4 x 16 mm2 m' 160 43,470 6,955,200
4 PP-2 NYY 4 x 70 mm2 m' 24 745,545 17,893,080
5 PP- 3 NYY 4 x 70 mm2 m' 24 745,545 17,893,080
6 PP-AC NYA2 4 x 16 mm2 m' 75 43,470 3,260,250
1.6.4 Kabel dari SDP -3 ke PP LT.03
1 PP - 2 NYY 4 x 6 mm2 m' 36 54,395 1,958,220
2 PP -P2 NYA2 4 x 25 mm2 m' 377 26,795 10,101,715
3 PP-SK2 NYA2 4 x 16 mm2 m' 165 43,470 7,172,550
4 PP-2 NYY 4 x 70 mm2 m' 36 745,545 26,839,620
5 PP- 3 NYY 4 x 70 mm2 m' 36 745,545 26,839,620
6 PP-AC NYA2 4 x 16 mm2 m' 111 43,470 4,825,170
A.1.7 Kabel Tray Arus Kuat
Termasuk accessories dan material bantu
1.7.1 Lantai 01
1 - uk. 600 mm x 100 mm m' 4 155,825 623,300
2 - uk. 200 mm x 100 mm m' 40 235,070 9,402,783
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)
1.7.2 Lantai 02
1 - uk. 600 mm x 100 mm m' 8 155,825 1,246,600
2 - uk. 200 mm x 100 mm m' 40 235,070 9,402,783
1.7.3 Lantai 03
1 - uk. 600 mm x 100 mm m' 11 155,825 1,714,075
2 - uk. 200 mm x 100 mm m' 42 235,070 9,872,923
A.1.8 Pekerjaan Pentanahan
1 kabel Grounding BCC 6 mm² m 10 18,000 180,000
2 BCC 10 mm² m 10 21,000 210,000
3 BCC 16 mm² m 10 35,000 350,000
4 BCC 50 mm² m 10 110,000 1,100,000
5 BCC 120 mm²
Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU m 10 350,000 3,500,000
6 Bar unit 1 1,500,000 1,500,000
ukuran 40 x 40
Pentanahan x 40 cm
copper claddan
rodtahanan tanah
1" x 12 m dibawah
lengkap bak 2kontrol
ohm dan CU
7 Bar unit 1 1,500,000 1,500,000
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 1 ohm
A.1.9 Pekerjaan Lampu / Titik Nyala / Stop Kontak
1.9.1 Lantai 01
1 Lampu TL 2 x 18 watt bh 27 376,890 10,176,017
2 Lampu Down Light PLC 1 x 18 watt bh 40 273,390 10,935,580
3 Stop kontak 1P / 16 A 220 Volt bh 20 49,680 993,600
4 Saklar Tunggal bh 5 50,083 250,413
5 Saklar Ganda bh 30 53,705 1,611,150
6 Grid Switch 8 Gang bh 1 200,000 200,000
Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit
ttk 67 493,695 33,077,565
PVC HI 20 mm
7
Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI
ttk 20 493,695 9,873,900
8 20 mm
A.1.10 Lantai 02
1 Lampu TL 2 x 18 watt bh 22 376,890 8,291,569
2 Lampu Down Light PLC 1 x 18 watt bh 23 273,390 6,287,959
3 Stop kontak 1P / 16 A 220 Volt bh 7 49,680 347,760
4 Stop kontak 1P / 16 A 220 Volt AC bh 2 49,680 99,360
5 Saklar Tunggal bh 4 50,083 200,330
6 Saklar Ganda bh 20 50,083 1,001,650
7 Grid Switch 8 Gang bh 1 200,000 200,000
Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit
8 ttk 45 493,695 22,216,275
PVC HI 20 mm

9 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI ttk 7 493,695 3,455,865
20 mm

10 Titik nyala Stop kontak AC NYM 4 x 2,5 mm² didalam conduit PVC ttk 2 493,695 987,390
HI 20 mm AC
A.1.11 Lantai 03
1 Lampu TL 2 x 18 watt bh 27 376,890 10,176,017
2 Lampu Down Light PLC 1 x 18 watt bh 43 273,390 11,755,749
3 Stop kontak 1P / 16 A 220 Volt bh 11 49,680 546,480
4 Stop kontak 1P / 16 A 220 Volt AC bh 4 49,680 198,720
5 Saklar Tunggal bh 7 50,083 350,578
6 Saklar Ganda bh 34 50,083 1,702,805
7 Grid Switch 8 Gang bh 1 200,000 200,000

8 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit ttk 70 493,695 34,558,650
PVC HI 20 mm

9 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI ttk 11 493,695 5,430,645
20 mm

10 Titik nyala Stop kontak AC NYM 4 x 2,5 mm² didalam conduit PVC ttk 4 493,695 1,974,780
HI 20 mm AC
A.1.12 Testing & Commissioning

1 Testing & Commissioning peralatan dan instalasi elektrikal lot 1


terpasang 2,000,000 2,000,000
termasuk panel - panel, pengkabelan, grounding dan instalasi
lampu
TOTAL A PEKERJAAN ELEKTRIKAL 695,769,771
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)
B PEKERJAAN PENANGKAL PETIR
Pengadaan dan pemasangan sistim sesuai dengan
gambar & Spesifikasi Teknis
1 Air Terminal Elektro Statik ( Cover Area R =150 m ) bh 1 5,000,000 5,000,000
2 Galvanis Pipe 1" / 1 m, lengkap dudukan angkur dan guykit set 1 200,000 200,000
3 Lampu Obstruction bh 1 1,200,000 1,200,000
Kabel konductor N2XSY 1x70 mm2 dalam Conduit PVC HI dia 20
4 mm m' 10 220,000 2,200,000
5 Beam Clamp + Support bh 70 150,000 10,500,000
6 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol unit 1 2,000,000 2,000,000

ukuran 40 x 40 x 60 cm dan tahanan tanah dibawah 2 ohm diukur


setelah
3 hari hujan terakhir
TOTAL B. PEKERJAAN PENANGKAL PETIR 21,100,000
C PEKERJAAN PEMADAM API
C.1 Lantai 01
1 Smoke Detector bh 5 436,770 2,183,850
2 Alat pemadam Portable 1 kg bh 2 2,787,500 5,575,000
3 Alat pemadam Portable 3 kg bh 2 3,122,000 6,244,000
C.2 Lantai 02
1 Smoke Detector bh 5 436,770 2,183,850
2 Alat pemadam Portable 1 kg bh 2 2,787,500 5,575,000
3 Alat pemadam Portable 3 kg bh 2 3,122,000 6,244,000
C.3 Lantai 03
1 Smoke Detector bh 6 436,770 2,620,620
2 Alat pemadam Portable 1 kg bh 2 2,787,500 5,575,000
3 Alat pemadam Portable 3 kg bh 1 3,122,000 3,122,000
C.4 Pemasangan Alat Pemadam Portable titik 11 500,000 5,500,000
TOTAL C. PEKERJAAN PEMADAM API 44,823,320
D PEKERJAAN SOUND SYSTEM TATA SUARA
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis
D.1 Peralatan Utama
1 Power Amplifier 240 W unit 1 4,356,000 4,356,000
3 Mixer Pre Amplifier / Sistem Controller unit 1 10,000,000 10,000,000
dilengkapi dengan :
- Emergency Control Panel
- Interface to Fire Alarm
- Pre-record Message
- Activated by Programmable
4 CD Player + MP 3 set 1 6,000,000 6,000,000
5 Paging Microphone & Chime Tone + Key Pad ( Car Call ) unit 1 2,600,000 2,600,000
6 Emergency Mic unit 1 1,200,000 1,200,000
7 Program Selector / Selector Switch unit 1 5,500,000 5,500,000
8 Kabinet Rack lengkap blower junction dan aksesories + unit 1 12,000,000 12,000,000
Rectifier & Battery charger

9 Power Supply lengkap dengan surge arrester & UPS kap 1 kW unit 1 5,000,000 5,000,000
10 Main Distibution Frame (MDF) Sound System unit 1 3,000,000 3,000,000
11 Instalasi pengkabelan peralatan utama (ruang kontrol) lot 1 1,000,000 1,000,000
D.2 Pengkabelan Utama
1 Kabel di dalam conduit PVC HI dia 20 mm dari MDF ke:
- NYMHY 3 x 1.5m - TB. SS . 1 m' 167 18,975 3,168,825
- NYMHY 3 x 1.5m - TB. SS . 2 m' 258 18,975 4,895,550
- NYMHY 3 x 1.5m - TB. SS . 3 m' 111 18,975 2,106,225
D.3 Pekerjaan Instalasi Sound System Pada Bangunan
3.1 Lantai 01
1 Terminal Box Sound System Lt. 1 (TB. SS. 1) bh 9 361,675 3,255,075
2 Ceiling speaker 3 watt bh 9 265,363 2,388,263
3 Box Speaker 6 Watt bh 1 1,181,050 1,181,050
4 Horn Speaker 15 Watt bh 1 4,370,000 4,370,000
5 Atenuator / Volume Kontrol bh 9 178,750 1,608,750
Instalasi untuk Box Speaker & Horn Speaker dengan kabel NYMHY
6 3 x 1.5 mm2 ttk 9 327,725 2,949,526
dalam conduit PVC HI dia. 20 mm
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)

7 Instalasi untuk Box Speaker dengan kabel FRC 2 x1x 1.5 mm2 ttk 9 327,725 2,949,526
dalam conduit PVC HI dia. 20 mm
3.2 Lantai 02
1 Terminal Box Sound System Lt. 02 (TB. SS. M) bh 7 361,675 2,531,725
2 Ceiling speaker 3 watt bh 7 265,363 1,857,538
3 Box Speaker 6 Watt bh 1 1,181,050 1,181,050
4 Horn Speaker 15 Watt bh 1 4,370,000 4,370,000
5 Atenuator / Volume Kontrol bh 7 178,750 1,251,250

Instalasi untuk Box Speaker & Horn Speaker dengan kabel NYMHY
6 3 x 1.5 mm2 ttk 9 327,725 2,949,526
dalam conduit PVC HI dia. 20 mm

7 Instalasi untuk Box Speaker dengan kabel FRC 2 x1x 1.5 mm2 ttk 10 327,725 3,277,251
dalam conduit PVC HI dia. 20 mm
3.3 Lantai 03
1 Terminal Box Sound System Lt. 3 (TB. SS. 2) bh 13 361,675 4,701,775
2 Ceiling speaker 3 watt bh 13 265,363 3,449,713
3 Box Speaker 6 Watt bh 1 1,181,050 1,181,050
4 Horn Speaker 15 Watt bh 1 4,370,000 4,370,000
5 Atenuator / Volume Kontrol bh 13 178,750 2,323,750
Instalasi untuk Cealing Speaker & Horn Speaker dengan kabel
6 NYMHY 3 x 1.5 mm2 ttk 13 327,725 4,260,426
dalam conduit PVC HI dia. 20 mm

7 Instalasi untuk Box Speaker dengan kabel FRC 2 x1x 1.5 mm2 ttk 13 327,725 4,260,426
dalam conduit PVC HI dia. 20 mm
D.4 Testing & Commissioning

1 Testing & Commissioning peralatan dan instalasi sound system lot 1 2,000,000 2,000,000
TOTAL D. PEKERJAAN SOUND SYSTEM 123,494,268
E PEKERJAAN CCTV
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis
E.1 Peralatan Utama dan Kabel Utama (R.Kontrol)
1 Digital Multi Plexer 16 chanel set 1 3,335,000 3,335,000
2 Monitor LCD 21" unit 1 2,200,000 2,200,000
3 CD Recorder unit 1 2,288,000 2,288,000
4 Video Metric Switch Processor unit 1 3,300,000 3,300,000
5 Power Supply lengkap dengan surge arrester unit 1 2,000,000 2,000,000
6 UPS 1 KVA 30 menit unit 1 8,000,000 8,000,000
7 Instalasi pengkabelan peralatan utama lot 1 2,500,000 2,500,000
E.2 Pekerjaan Instalasi CCTV pada Bangunan
2.1 Lantai 01
1 Indoor Dome Camera colour lensa + power supply unit 1 2,543,750 2,543,750
2 Indoor Fix Camera colour lensa 1/3" + power supply Unit 3 1,650,000 4,950,000

3 Instalasi CCTV UTP Cat 5 ( 4 pair ) conduit PVC HI dia. 20 mm


m' 3 70,331 210,994
Instalasi power dengan kabel NYA 2 x 2,5 mm² dalam conduit PVC
4
HI 20 mm m' 50 22,195 1,109,750
5 Stop kontak Ceiling 1P / 16 A 220 Volt ( Power CCTV ) bh 4 406,983 1,627,932
2.2 Lantai 02
1 Indoor Dome Camera colour lensa + power supply unit 1 2,543,750 2,543,750
2 Indoor Fix Camera colour lensa 1/3" + power supply unit 4 1,650,000 6,600,000

3 Instalasi CCTV UTP Cat 5 ( 4 pair ) conduit PVC HI dia. 20 mm


m' 5 70,331 351,657
Instalasi power dengan kabel NYM 3 x 2,5 mm² dalam conduit PVC
4
HI 20 mm m' 56 22,195 1,242,920
5 Stop kontak Ceiling 1P / 16 A 220 Volt ( Power CCTV ) bh 5 406,983 2,034,915
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)
2.3 Lantai 03
1 Indoor Dome Camera colour lensa + power supply unit 1 2,543,750 2,543,750
2 Indoor Fix Camera colour lensa 1/3" + power supply Unit 2 1,650,000 3,300,000

3 Instalasi CCTV UTP Cat 5 ( 4 pair ) conduit PVC HI dia. 20 mm


m' 5 70,331 351,657
Instalasi power dengan kabel NYM 3 x 2,5 mm² dalam conduit PVC
4
HI 20 mm m' 50 22,195 1,109,750
5 Stop kontak Ceiling 1P / 16 A 220 Volt ( Power CCTV ) bh 3 406,983 1,220,949
E.3 Testing & Commissioning
1 Testing & Commissioning peralatan dan instalasi CCTV lot 1 1,500,000 1,500,000
TOTAL E. PEKERJAAN CCTV 56,864,776
F. Pekerjaan Kabel Ladder dan Kabel Tray
F.1 Kabel Tray Arus Lemah
Termasuk accessories dan material bantu
1 Lantai 01
- uk. 400 mm x 100 mm include cover m' 4 322,575.00 1,290,300.00
- uk. 200 mm x 100 mm m' 40 235,069.58 9,402,783.33
2 Lantai 02
- uk. 400 mm x 100 mm include cover m' 8 322,575.00 2,580,600.00
- uk. 200 mm x 100 mm m' 50 235,069.58 11,753,479.17
3 Lantai 03
- uk. 400 mm x 100 mm include cover m' 11 322,575.00 3,548,325.00
- uk. 200 mm x 100 mm m' 50 235,069.58 11,753,479.17
TOTAL F. PEKERJAAN KABEL TRAY ARUS LEMAH 40,328,966.67
TOTAL PEKERJAAN ME (IV) 982,381,101
HASIL PERKIRAAN SENDIRI [HPS]
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
UNIT PEKERJAAN : ME - PLUMBING
LOKASI : KABUPATEN MUNA
TAHUN : 2022

HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)

V. PEKERJAAN PLAMBING
A. Peralatan Utama Air Bersih, Air Kotor, Bekas, Vent & Air Hujan
Pengadaan & pemasangan peralatan Utama Air Bersih, Air Kotor,
Bekas, Vent & Air Hujan, lengkap terpasang dengan alat bantu &
accessories yang diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis,

1 Pompa Transfer 1 Unit 4,599,000 4,599,000


2 Ground Water Tank 2 unit 4,000,000 8,000,000
- Kapasitas : 1200 Liter
- Jumlah : 2 Unit
- Tipe : Stanlis
- Lokasi : Lantai Site Plan
B. Pekerjaan Instalasi Pemipaan Plumbing
B.1. Box Pompa
1 Instalasi Air Bersih
a Pemipaan Air Bersih
Pengadaan dan pemasangan Air Bersih, bahan pipa GIP lengkap
terpasang dengan alat bantu dan accessories lain yang diperlukan
sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa AB, GP Dia, 65 mm (Header) 5 m 266,699 1,333,496


- Pipa AB GIP Dia 50 mm 30 m 204,154 6,124,613
Material Bantu + Fitting 1 lot 1,500,000 1,500,000

b Valve-Valve - Area Pompa


Pengadaan dan pemasangan Valve-Valve lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
- Gate Valve Dia 50 mm/2" 1 bh 3,997,745 3,997,745
- Strainer Dia 50 mm/2" 1 bh 3,581,664 3,581,664
- Check Valve Dia 50 mm/2" 1 bh 1,373,664 1,373,664
- Flexible Joint Dia 50 mm/2" 1 bh 1,348,364 1,348,364
- Foot Valve Dia 50 mm/2" 1 bh 867,664 867,664
- Floating Valve Dia 50 mm/2" 1 bh 867,664 867,664
Material Bantu 1 lot 1,500,000 1,500,000
C, Instalasi Air Bersih
C.1. Lantai Satu
1.1 Detail Toilet
a Pemipaan Air Bersih

Pengadaan dan pemasangan Air Bersih, bahan pipa PPR PN 10,


lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa AB PPR 10 Dia 32 60 m 76,482 4,588,931


- Pipa AB PPR 10 Dia 32 30 m 70,312 2,109,373
- Pipa AB PPR 10 Dia 32 48.4 m 63,642 3,080,294
- Pipa AB PPR 10 Dia 32 12 m 58,640 703,679
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
a.1 Valve-Valve
Pengadaan dan pemasangan Valve-Valve lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
- Gate Valve Dia 32 4 bh 2,169,245 8,676,980
b Instalasi Air Kotor, Floor drain,Wastafel, urinoir dan Vent
b.1 Pemipaan Air Kotor, Bekas, Kitchen Drain dan Vent

Pengadaan dan pemasangan Air Kotor dan bekas bahan pipa PVC
Class AW,dan Vent bahan pipa PVC Class D, lengkap terpasang
dengan alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa Air Kotor Ø 100 38.55 m 192,808 7,432,759


- Pipa Air Bekas Ø 80 9.5 m 133,540 1,268,631
- Pipa Air Bekas Ø 65 12 m 107,805 1,293,664
- Pipa Air Bekas Ø 50 16 m 75,975 1,215,608
- Pipa Vent (Riser ) Ø 65 12.47 m 107,805 1,344,332
- Pipa Vent Ø 50 12.47 m 75,975 947,414
- Pipa Vent Ø 32 12.47 m 65,726 819,604
- Pipa Vent Ø 25 12.47 m 43,409 541,309
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
b.2 Floor Drain, Clean Out
Pengadaan dan pemasangan Floor Drain dan Clean Out, lengkap
terpasang dengan alat bantu dan accessories lain yang diperlukan
sesuai gambar perencanaan dan spesifikasi teknis.
- F D Ø 50 8 bh 51,463 411,700
- C O Ø 50 4 bh 57,788 231,150
- C O Ø 100 4 bh 57,788 231,150
Material Bantu 1 lot 1,500,000 1,500,000

C.2. Lantai Dua


2.1 Detail Toilet
a Pemipaan Air Bersih

Pengadaan dan pemasangan Air Bersih, bahan pipa PPR PN 10,


lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa AB Dia 32 44 m 65,726 2,891,948


- Pipa AB Dia 25 22 m 43,409 954,996
- Pipa AB Dia 20 48.4 m 43,111 2,086,554
- Pipa AB Dia 15 12 m 71,965 863,578
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
Valve-Valve
a.2 Pengadaan dan pemasangan Valve-Valve lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
- Gate Valve Ø 32 4 bh 2,169,245 8,676,980
Instalasi Air Kotor, Bekas, Kitchen Drain dan Vent
b Instalasi Air Kotor, Floor drain,Wastafel, urinoir dan Vent
b.1 Pengadaan dan pemasangan Air Kotor dan bekas bahan pipa PVC
Class AW,dan Vent bahan pipa PVC Class D, lengkap terpasang
dengan alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa Air Kotor Ø 100 16.05 m 192,808 3,094,573


- Pipa Air Bekas Ø 80 5.7 m 133,540 761,179
- Pipa Air Bekas Ø 65 27.75 m 107,805 2,991,597
- Pipa Air Bekas Ø 50 6.4 m 75,975 486,243
- Pipa Vent (Riser ) Ø 65 11 m 107,805 1,185,858
- Pipa Vent Ø 50 8 m 75,975 607,804
- Pipa Vent Ø 32 8 m 65,726 525,809
- Pipa Vent Ø 25 8 m 43,409 347,271
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
b.2 Floor Drain, Clean Out
Pengadaan dan pemasangan Floor Drain dan Clean Out, lengkap
terpasang dengan alat bantu dan accessories lain yang diperlukan
sesuai gambar perencanaan dan spesifikasi teknis.
- F D Ø 50 8 bh 51,463 411,700
- C O Ø 50 4 bh 57,788 231,150
- C O Ø 100 4 bh 57,788 231,150
Material Bantu 1 lot 1,500,000 1,500,000

C.3. Lantai Tiga


2.1 Detail Toilet
a Pemipaan Air Bersih

Pengadaan dan pemasangan Air Bersih, bahan pipa PPR PN 10,


lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa AB Ø 32 22.5 m 65,726 1,478,837


- Pipa AB Ø 25 10 m 43,409 434,089
- Pipa AB Ø 20 48.4 m 43,111 2,086,554
- Pipa AB Ø 15 12 m 71,965 863,578
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
Valve-Valve
a.2 Pengadaan dan pemasangan Valve-Valve lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
- Gate Valve Ø 32 4 bh 2,169,245 8,676,980
Instalasi Air Kotor, Bekas, Kitchen Drain dan Vent
b Instalasi Air Kotor, Floor drain,Wastafel, urinoir dan Vent
b.1 Pengadaan dan pemasangan Air Kotor dan bekas bahan pipa PVC
Class AW,dan Vent bahan pipa PVC Class D, lengkap terpasang
dengan alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.

- Pipa Air Kotor Ø 100 16.05 m 192,808 3,094,573


- Pipa Air Bekas Ø 80 5.7 m 133,540 761,179
- Pipa Air Bekas Ø 65 27.75 m 107,805 2,991,597
- Pipa Air Bekas Ø 50 6.4 m 75,975 486,243
- Pipa Vent (Riser ) Ø 65 11 m 107,805 1,185,858
'- Pipa Vent Ø 50 8 m 75,975 607,804
- Pipa Vent Ø 32 8 m 65,726 525,809
- Pipa Vent Ø 25 8 m 43,409 347,271
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
b.2 Floor Drain, Clean Out
Pengadaan dan pemasangan Floor Drain dan Clean Out, lengkap
terpasang dengan alat bantu dan accessories lain yang diperlukan
sesuai gambar perencanaan dan spesifikasi teknis.
- F D Ø 50 8 bh 51,463 411,700
- C O Ø 50 2 bh 57,788 115,575
- C O Ø 100 2 bh 57,788 115,575
Material Bantu 1 lot 1,500,000 1,500,000
C.4. Lantai Top Floor
Pekerjaan Air Bersih
a Profil Tank Staniles 2 unit 4,000,000 8,000,000
- Kapasitas : 1200 Liter
- Jumlah : 2 Unit
- Tipe : Stenliis
Lokasi : Dek Top Floor
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
b Booster Pump 1 set 1,404,900 1,404,900
- Kapasitas : 1200 Liter
- Putaran : 1450 Rpm
- Type : Centrifugal End Suction
include pressure tank , panel , Inverter
c Pemipaan Air Bersih

Pengadaan dan pemasangan Air Bersih, bahan pipa PPR PN 10,


lengkap terpasang dengan alat bantu dan accessories lain yang
diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa AB Ø 65 header) 12 m 160,553 1,926,635


- Pipa AB Ø 50 8 m 119,366 954,926
- Pipa AB Ø 32 12 m 76,482 917,786
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
d Valve-Valve
Pengadaan dan pemasangan Valve-Valve lengkap terpasang dengan
alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
- Gate Valve Ø 50 6 bh 3,997,745 23,986,470
- Gate Valve Ø 32 6 bh 1,594,245 9,565,470
Material Bantu 1 lot 1,500,000 1,500,000

e Instalasi Air Hujan


Pemipaan Air Hujan

Pengadaan dan pemasangan Air Kotor dan bekas bahan pipa PVC
Class AW, lengkap terpasang dengan alat bantu dan accessories lain
yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.

- Pipa Air Hujan Ø 150 114.57 m 459,191 52,607,484


- Pipa Air Hujan Ø 80 43.6 m 133,540 5,822,351
- Pipa Air Hujan Ø 65 13.5 m 107,805 1,455,372
- Roof Drain Ø 80 10 bh 51,463 514,625
- Roof Drain Ø 50 10 bh 51,463 514,625
Material Bantu + Fitting 1 lot 1,500,000 1,500,000
TOTAL PEKERJAAN PLAMBING 246,192,708.09
HASIL PERKIRAAN SENDIRI [HPS]
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
UNIT PEKERJAAN : SARANA DAN PRASARANA
LOKASI : KABUPATEN MUNA
TAHUN : 2022

HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)

I. PEKERJAAN SEPTICTANK
1 Pek. Galian Tanah
Galian Septictank M3 14.56 121,612.50 1,770,784.41
Galian Resapan M3 6.64 121,612.50 807,780.63
Galian Pipa Penghubung M3 0.64 121,612.50 78,367.10
2 Pek. Pasir Urug dasar Galian dan Resapan M3 0.34 259,785.00 87,969.70
3 Pek. Urugan Kembali Bekas Galian M3 0.82 71,875.00 58,995.00
4 Pek. Beton
Plat dasar
Lantai Kerja M3 0.68 1,189,230.03 805,406.04
Beton Bertulang (150 kg besi+Bekesting) M3 1.02 7,531,824.95 7,651,392.67
Plat Dinding
Dinding Beton Bertulang (150 kg besi+Bekesting) M3 3.47 10,192,367.20 35,328,018.76
Plat Beton Atas/Penutup
Beton K 275 M3 1.02 1,466,687.99 1,489,971.66
Besi kg 111.75 18,467.85 2,063,712.98
Bekesting m2 6.77 398,900.50 2,701,553.64
5 Pas. Batu Bata 1 : 4 M2 15.05 166,140.50 2,500,414.53
6 Pek. Plesteran Dinding resapan 1:2 M2 15.05 92,882.46 1,397,881.08
7 Urugan Kerikil M3 1.13 198,559.00 223,605.23
8 Lapisan Ijuk M2 18.77 200,962.50 3,771,865.16
9 Pas. Pipa PVC 6" M1 5.00 459,190.93 2,295,954.64
II. PEKERJAAN PELATARAN & LANDSCAPE
A. Pek. Pas. Pavingblock (halaman Entrance)
1 Pek. Pas. Paving Block Pres Mesin M2 80.83 326,318.25 26,376,304.15
2 Pek. Pasir urug Bawah Paving Block M3 4.04 259,785.00 1,049,921.08
3 Pek. Canstine Beton Mutu K 100 M3 2.34 1,189,230.03 2,780,419.82
B. Pek. Pas. Paving Block (Akses,parkir dan Pelataran)
1 Pek. Pas. Paving Block Pres Mesin M2 392.00 326,318.25 127,916,754.00
2 Pek. Pasir urug Bawah Paving Block M3 19.60 259,785.00 5,091,786.00
3 Pek. Canstine Beton Mutu K 100 M3 6.05 1,189,230.03 7,194,841.69
C Pek. Rabat Keliling Bangunan K 100 M3 18.45 1,189,230.03 21,941,294.09
D Pek. Saluran Kelliling Bangunan
1 Pek. Galian Tanah Saluran M3 20.90 131,726.75 2,752,562.17
2 Pek. Pasir urug Dasar Saluran M3 2.61 259,785.00 678,558.42
3 Pek. Pas. Bata Saluran 1:4 M2 117.54 166,140.50 19,528,154.37
4 Pek. Plesteran Saluran 1:3 M2 117.54 88,852.04 10,443,668.31
5 Pek. Acian Saluran M2 117.54 29,359.50 3,450,915.63
E Pek. Pot Bunga
1 Pek. Galian Tanah m3 1.98 131,726.75 260,818.97
2 Urugan Tanah Humus dalam pot m3 14.41 178,135.00 2,567,709.14
3 Pek. Pasir urug m3 0.33 259,785.00 85,729.05
4 Pek. Pas. Bata 1:4 M2 18.48 166,140.50 3,070,276.44
5 Pek. Plesteran 1:3 M2 37.09 88,852.04 3,295,522.02
6 Pek. Acian M2 18.61 29,359.50 546,380.30

TOTAL PEKERJAAN PELATARAN (I) 302,065,288.85


PERHITUNGAN VOLU
NO KET. JENIS PANJANG
M

KOLOM 1 WF 400.200.0,8 7.4


KOLOM 2 WF 400.200.0,8 3.4
TOTAL KOLOM
BALOK INDUK X 1 (UTUH) WF 300.150.0,8 4.98
BALOK INDUK X 2 WF 300.150.0,8 2.06
KANTILEVER 1.36
1.06
0.86
1.38
1.18

BALOK INDUK Y WF 300.150.0,8 4.59


BALOK INDUK Y2 POT WF 300.150.0,8 1.87

TOTAL BALOK INDUK

BALOK ANAK X UTUH WF 200.100.0,6 4.97


BALOK ANAK POT WF 200.100.0,6 14.38

kolom fasade WF 200.100.0,6 14.4


RB INDUK X WF 300.150.0,8 4.98
RB INDUK Y WF 300.150.0,8 4.59
POT 2.37
POT 2
POT 3

RB ANAK 1 WF 200.100.0,6
RB ANAK 2
JOIN PLAT KLOM KE PONDASI BASEPLATE 500.300.12 mm
PLAT TUTUP ATAS KOLOM BASEPLATE 400.200.12 mm
JOIN PLAT KOLOM KE BALOK INDUK BASEPLATE 400.200.12 mm
JOIN PLAT BALOK ANAK KE BALOK IND BASEPLATE 200.100.12 mm
JOIN PLAT KOLOM KE RB INDUK BASEPLATE 400.200.12 mm
JOIN PLAT RB ANAK KE INDUK BASEPLATE 200.100.12 mm
ANGKUR KOLOM KE PONDASI M20 L=350 mm
HTB KOLOM KE BALOK M16 L=50 mm
HTB KOLOM KE RB M16 L=50 mm
HTB BALOK ANAK KE INDUK M16 L=50 mm
HTB RB ANAK KE INDUK M16 L=50 mm
BONDEK
BESI BETON

BANGUNAN B
BAJA P
WF 300 KOLOM 7
KOLOM 3

WF 250/120 BALOK LT.02 4.98


4.69
2.98
2.35
5.7
2

WF 200 BALOK ANAK LT.2 5


3

WF 250/120 BALOK LT.03 8


0.71
9
1.1

GORDING 9
8

WF 200 BALOK ANAK LT.3 8


1.5
5
2.5
6
2

cat wf 300 19
cat wf 250 20.9833333333333 37.0833333333
cat wf 200 6.58333333333333 4.70833333333
7

No Diameter
mm

1 4.0
2 5.0
3 5.5
4 5.7
5 6.0
6 6.5
7 8.0
8 9.0
9 10.0
10 11.0

DAFTAR

NO.
1 100 x
2 125 x
3 148 x
4 150 x
5 175 x
6 198 x
7 200 x
8 248 x
9 250 x
10 298 x
11 300 x
12 346 x
13 350 x
14 396 x
15 400 x
16 446 x
17 450 x
18 500 x
19 588 x
20 600 x
21 700 x
22 800 x
23 900 x

DAFTAR B

NO. U

1 25 x
2 30 x
3 40 x
4 40 x
5 50 x
6 50 x
7 60 x
8 60 x
9 65 x
10 70 x
11 75 x
12 75 x
13 80 x
14 90 x
15 100 x
16 100 x
17 120 x
18 120 x
19 125 x
20 130 x
21 130 x

KURAN UKURAN/ROLL BERAT/ROLL

Wiremesh M4 2,1m X 54m 154,5 kg

Wiremesh M5 2,1m X 54m 241,4 kg

Wiremesh M6 2,1m X 54m 347,6 kg

Wiremesh M7 - -

Wiremesh M8 - -
Wiremesh M9 - -

Wiremesh M10 - -

Wiremesh M12 - -

DAFTAR HARGA BONDEK


WIREMESH KENDARI 2022

No Nama Kisaran
Harga
1 Bondek Galvanis Lebar IDR
1000mm Tebal 0,65mm 105.000 /m
2 Bondek Galvanis Lebar IDR
1000mm Tebal 0,70mm 110.000 /m
3 Bondek Galvanis Lebar IDR
1000mm Tebal 0,75mm 115.000 /m
4 Bondek Galvanis Lebar IDR
1000mm Tebal 1,00mm 120.000 /m
8 Bondek Galvalume Lebar IDR
1000mm Tebal 1,00mm 122.000 /m
13 Besi Wiremesh Diameter IDR
8mm (M8) 555.000 /Lbr

14 Besi Wiremesh Diameter IDR


9mm (M9) 720.000 /Lbr
15 Besi Wiremesh Diameter IDR
10mm (M10) 888.000 /Lbr

16 Besi Wiremesh Diameter IDR


12mm (M12) 1.293.000
/Lbr
17 Besi Wiremesh Diameter IDR
4mm (M4) 1.490.000
/Rol
18 Besi Wiremesh Diameter IDR
4mm (M4) 2.220.000
/Rol
19 Besi Wiremesh Diameter IDR
4mm (M4) 3.120.000
/Rol
20 Besi Wiremesh Diameter IDR
4mm (M4) 4.420.000
/Rol
RHITUNGAN VOLUME BAJA
JUM TOTAL SAT BTG KG/
BTNG 12 M BTG

88 651.2 M
16 54.4 M
TOTAL KOLOM 705.6 M 58.80 792
86 428.28 M 67.62
2 4.12 M
1 1.36 M
6 6.36 M
7 6.02 M
1 1.38 M
1 1.18 M
X 448.7 37.39 440.0
92 422.28 M
10 18.7 M
Y 440.98 36.75
OTAL BALOK INDUK 889.68 M 74.14 440.0

89 442.33 M 36.86 256


0 0 M 1.20 256
38.06 256
1.20 256
56 278.88 M 23.24 440.0
72 330.48 M 27.54 440.0
6 14.22 M 1.19 440.0
6 12 M 1.00 440.0
4 10 M 1 440
54
JUMLAH

270 M 22.50 256


0 M
0
0
0
0
0
0
0
0
0
0
0
0
0

J T
30 210 17.5
6 18 1.5
19 440 8360
10 49.8 4.15
30 140.7 11.725
10 29.8 2.48333333333333
2 4.7 0.391666666666667
4 22.8 1.9
2 4 0.333333333333333
20.9833333333333 355 7449.08333333333
11 55 4.58333333333333
8 24 2
6.58333333333333 256 1685.33333333333

15 120 10
15 10.65 0.89
4 36 3
4 4.4 0.37
14.25 355 5060.23
36 324 27.00
4 32 2.67
171.84 14.32
0 445 37.08
81.07 118.333333333333 9593.28

2 16 1.33333333333333
6 9 0.75
3 15 1.25
1 2.5 0.208333333333333
2 12 1
1 2 0.166666666666667
4.70833333333333 256 1205.33

19 1.2 22.8
58.0666667 36 0.98 35.28
11.2916667 11 0.8 8.8
66.88
20 140 280 23.3333333333333 5973.33333333333

Berat Besi No Diameter Berat Besi No.


Kg / m1 mm Kg / m1

0.13 11 12 0.89 1
0.12 12 13 1.04 2
0.19 13 14 1.21 3
0.20 14 16 1.58 4
0.22 15 19 2.23 5
0.31 16 22 2.98 6
0.40 17 23 3.26 7
0.53 18 25 3.85 8
0.62 19 28 4.83 9
0.75 20 31 5.93
21 32 6.31

DAFTAR BERAT BESI IWF

UKURAN IWF
50 x 5 x 7
60 x 6 x 8
100 x 6 x 9
75 x 5 x 7
90 x 5 x 8
99 x 4.5 x 7
100 x 5.5 x 8
124 x 5 x 8
125 x 6 x 9
149 x 6 x 8
150 x 6.5 x 9
174 x 6 x 9
175 x 7 x 11
199 x 7 x 11
200 x 8 x 13
199 x 8 x 12
200 x 9 x 14
200 x 10 x 16
300 x 12 x 20
200 x 11 x 17
300 x 13 x 24
300 x 14 x 26
300 x 16 x 28

DAFTAR BERAT BESI SIKU " L "

UKURAN BESI KANAL " L "

25 x 3 x 6
30 x 3 x 6
40 x 3 x 6
40 x 4 x 6
50 x 4 x 6
50 x 5 x 6
60 x 5 x 6
60 x 6 x 6
65 x 6 x 6
70 x 7 x 6
75 x 6 x 6
75 x 8 x 6
80 x 8 x 6
90 x 9 x 6
100 x 8 x 6
100 x 10 x 6
120 x 10 x 12
120 x 12 x 12
125 x 12 x 12
130 x 9 x 12
130 x 12 x 12

UKURAN/
BERAT/LBR*
LBR
2,1m X
15,45 kg
5,4m
2,1m X
24,14 kg
5,4m
2,1m X
34,76 kg
5,4m
2,1m X
47,31 kg
5,4m
2,1m X
61,79 kg
5,4m
2,1m X
78,20 kg
5,4m
2,1m X
96,55 kg
5,4m
2,1m X
139,02 kg
5,4m

mobils

115000 10000 125000

berat
JUMLAH
KG 1KE5 7KE8 10KE11
12KE13 9KE11 7KE8
14 21 10
cat 2 8 6
46,569.60 1.58 18.96 1115
1 2 3..4
5 6 7

16,452.33 6.88 7.50 14.38 1SD3 3SD5 5SD7


13 16 18

cat
32,621.60 1.20 14.40 1068 10

9,436.37 58.00 31.00 15.00 104.00 12 28


306.77 cat
9,743.15 0.80 9.60 365.37 A B C
307.2 12KE13 9KE11 6KE8
10,225.60 11.52 12 10 12
12,117.60 8 7 8
521.40
440.00
367 cat
23671 774.7
162,779.56

###
5760 216

3550
1 27.5 27.5
2 25.78 25.78
3 1.72 24.06
4 22.34
5 20.62
6 18.9
7 17.18
8 15.46
171.84

70.6 1
64.8 2
5.8 59 3
53.2 4
47.4 5
41.6 6
35.8 7
30 8
24.2 9
18.4 10
445
Diameter Berat Besi
mm Kg / m1

10.00 0.62
13.00 1.04
16.00 1.58
19.00 2.23
22.00 2.98
25.00 3.85
29.00 5.19
32.00 6.31
36.00 7.99

Lampiran 2

BERAT 12 M1
mm 112.00 kg
mm 158.40 kg
mm 253.20 kg
mm 168.00 kg
mm 217.40 kg
mm 218.40 kg
mm 256.00 kg
mm 308.40 kg
mm 355.20 kg
mm 384.00 kg
mm 440.40 kg
mm 497.00 kg
mm 595.20 kg
mm 679.20 kg
mm 792.00 kg
mm 794.40 kg
mm 912.00 kg
mm 1,075.00 kg
mm 1,812.00 kg
mm 1,272.00 kg
mm 2,220.00 kg
mm 2,520.00 kg
mm 2,916.00 kg

BERAT / BATANG

mm 6.72 kg
mm 8.16 kg
mm 11.00 kg
mm 14.50 kg
mm 18.50 kg
mm 22.60 kg
mm 27.30 kg
mm 32.52 kg
mm 35.46 kg
mm 44.28 kg
mm 41.22 kg
mm 54.18 kg
mm 57.96 kg
mm 73.20 kg
mm 73.20 kg
mm 90.60 kg
mm 218.40 kg
mm 260.00 kg
mm 280.00 kg
mm 214.20 kg
mm 280.00 kg
1m3 beton 2.9 2.9 8.41 0.12 1.0092

wiremesh 10 2.1 5.4 11.34

96.55

827,442.68 13,391.21

555,000.00 600,000.00 9,710.31

61.79 5.45
565,500.00 272,442.68 9,324.45

900,276
880,000.00

96.55 10,500.00 1,013,775.00

1.93 20,275.50

2.1 5.4 11.34 41.18 2544.6146

0 Beton K 275 0 34.61 1,466,687.99


0 Wiremesh 8 kg 2,545 Err:509
0 Steel Deck/Bondek 0,75 mm m2 467.00 169,521.50
0 Bekesting Samping m2 21.20 213,399.75
5KE6 3KE4 1KE2
17 13 13 88
16

5..12 13
64 4 86

7SD8 8SD12 12SD13


4 36 5 92

32 4 32 8 104.00

D EF
1KE5
22 56
6 24 19 72
50,764,417.89
Err:509
79,166,540.50
4,523,647.90
Err:509
STANDAR SATUAN HARGA BARANG/JASA KEBUTUHAN
PEMERINTAH KABUPATEN MUNA TAHUN ANGGARAN 2022

No URAIAN BARANG SATUAN HARGA SATUAN


a b c d
UPAH KREJA
1 Mandor OH 150,000
2 Pekerja OH 110,000
3 Kepala Tukang OH 190,000
4 Tukang Kayu OH 150,000
5 Tukang Batu OH 150,000
6 Tukang Cat OH 150,000
7 Tukang Las Biasa OH 150,000
8 Tukang las Konstruksi OH 150,000
9 Tukang Gali OH 150,000
10 Tukang Besi Konstruksi OH 150,000
11 Tukang Khusus alluminium OH 150,000
12 Tukang Listrik OH 150,000
13 Tukang Alluminium/Kaca OH 150,000
14 Tukang Pipa OH 150,000
ALAT BANTU
1 Crane (di base camp) Jam 50,700
2 Trailer 28 ton Jam 50,700
3 crane (dilokasi) Jam 50,700
4 Pile driver hammer Jam 50,700
5 Welding set Jam 50,700
6 Mobilisai dan demobilisasi alat pancang ls 20,000,000
7 Handling tiang pancang di site btng 100,000
8 Penyambungan Tiang titik 50,000
9 Potong Kepala Tiang titik 50,000
10 Papan Nama Proyek LS 300,000
11 Air & Listrik Kerja LS 1,500,000
12 Administrasi dan Dokumentasi LS 5,000,000
13 Material bantu pas. Pipa PVC ls 1,500,000
14 Intalasi fire alrm ls 1,500,000
15 Testing Comision ls 2,000,000
16 Sewa alat perakitan jam 50,709
17 Sewa alat las listrik jam 50,709
18 Mesin Pancang Ls 2,350
19 Alat Bantu Pengecatan m2 2,000
20 Alat bantu pasang baja ringan m2 4,500
21 Mobilisasi alat baja ringan Ls 9,000
22 Instalasi Alat Electrical ls 1,000,000
23 Pemasangan Alat Pemadam Portable titik 500,000
24 Instalasi pengkabelan peralatan utama LS 2,500,000
25 Testing and Commissioning UTP LS 1,500,000
PERALATAN K3 DAN PENCEGAHAN COVID 19
1 Helm Kerja Buah 100,000
2 Sepatu Lumpur Pasang 150,000
3 Masker N95 Buah 100,000
4 Sarung Tangan Karet Lateks Pasang 75,000
5 Hand Sanitizer Liter 200,000
6 Pengukur Suhu Tubuh Digital Buah 500,000
7 Safety Belt Buah 125,000
8 Peralatan P3K & Obat-Obatan Ls 500,000
BAHAN DASAR BANGUNAN
1 PC (50 Kg) zak 82,000
2 Pc 1 kg kg 1,640
3 Plamur Tembok Kg 25,500
4 Warna Putih/PC (40 Kg) Kg 5,300
5 Pasir Beton (Maligano) M3 197,500
6 Pasir Pasangan M3 170,000
7 Pasir Urug M3 159,500
8 Tanah Timbunan Biasa M3 77,000
9 Tanah Timb. Pilihan M3 78,000
10 Ijuk Kg 26,000
11 Paving Blok Segi Cetak Manual M2 130,000
12 Batu Belah 15/25-25/35 cm M3 207,000
13 Kerikil Pecah (Maligano Pecah manual) M3 330,300
14 Kerikil Kali (Maligano) M3 91,800
15 Batu Merah Biji 945
16 Pintu PVC set 1,200,000
17 Tiang Pancang Dia. 40 cm M'' 1,050,000
18 Tiang Pancang Dia. 30 cm M'' 829,500
19 Polywood 9 mm Lembar 246,000
BAHAN PLAFOND
1 Triplex 9 mm (122x244 Cm) Lembar 151,000
2 Triplex 3 mm (122x244 Cm) Lembar 70,900
3 Gypsum Jaya Board (120x240 Cm, 9 mm) Lembar 94,000
4 Lisk Gypsum Jaya Board (120x240 Cm, 9 mm) m1 31,000
5 Tepung Gipsum Kg 1,500
6 List Plafond PVC 8 mm 15,000
BAHAN PENUTUP LANTAI
1 Nitro Granite Surface matt bora, fohn, kosawa, mistral 10x60 bh 8,200
2 Nitro Granite Surface Lapato Coal 60x60 M2 288,000
3 Tegel Keramik List 5 x 20 Cm (Putih) Buah 36,000
4 Keramik Warna 60 x 60 Cm Dos 188,000
5 Keramik Warna 40 x 40 Cm Dos 72,700
6 Keramik Putih 40 x 40 Cm Dos 78,000
7 Keramik Warna 30 x 30 Cm Dos 54,300
8 Keramik Putih 30 x 30 Cm Dos 46,500
9 Keramik Warna 20 x 25 Cm Dos 127,800
10 Keramik Putih 20 x 25 Cm Dos 93,000
11 Keramik Warna 20 x 20 Cm Dos 54,300
12 Keramik Putih 20 x 20 Cm Dos 62,400
BAHAN KACA DAN ALUMUNIUM
1 Kaca Bening 5 mm M2 225,000
2 ACP 122x244 cm Lembar 300,000
3 ACP m2 M2 104,000
4 ACP Laser Cutting lbr 800,000
5 ACP Laser Cutting m2 m2 277,000
6 Alumunium strip 6 mm m2 136,500
7 profil daun jendela lebar 8 cm m1 143,000
8 Sealent tube 25,000
9 karet kaca m 10,200
10 paku tembak payung bh 200
11 kaca tempered m2 1,450,000
12 Overpanel Pivot Patch Fitting PT 2240 US32 bh 923,000
13 Top Patch Fitting PT 2220 US32 bh 598,000
14 Bottom Patch Fitting PT 2210 US32 bh 598,000
15 Floor Hinge FH 84FB S bh 1,250,000
16 Patch Lock US2210 US32 bh 870,000
17 Double Cylinder DC.Fn1001-60 US14 bh 143,000
18 Pull Handle GHD4502 uk. 600x900mm US32 bh 1,400,000
19 Lubang Kaca Handle Pintu BH 70,000
20 Coak Path Fitting BH 30,000
21 Skrup fixer bh 500
BAHAN CAT
1 Thener ND Ltr 46,500
2 Politur/ Vernis Ltr 36,900
3 Cat Many/Dasar Avian Kg 27,700
4 Cat Galvanis Avian Kg 100
5 Cat Dasar Alkali Ltr 52,000
6 Cat Tembok Saniex Kg 46,000
7 Cat Many Kayu/Besi Kg 15,400
8 Cat Tembok Avitex Kg 53,600
9 Cat Tembok Metrolite Kg 51,800
10 Cat Tembok Aries Kg 38,200
11 Cat Kilap Kayu (Sejenis Avian) Ltr 62,400
12 Kuas Rol Buah 26,200
13 Kuas 5" Buah 34,300
14 Kuas 4" Buah 29,000
15 Kuas 3" Buah 14,100
16 Amplas Besi Lembar 10,000
17 Residu Kg 300
18 Amplas Halus Kayu Lembar 1,000
19 Amplas Kasar Kayu Lembar 4,500
20 Minyak bekesting ltr 5,000
21 Lem Kayu kg 21,000
BAHAN BESI DAN ATAP
1 Atap Onduline tile Lbr 185,000
2 Nok Atap Onduline tile Lbr 110,000
3 Seng Plat BWG BJLS 0.20 mm (lebar 30 Cm) m 19,300
4 Seng BWG 34" BJLS 0.20 mm kk 12,900
5 Baja ringan Kanal C75 0.75 Batang 160,000.00
6 Wiremesh dia 8 uk. 2,1 x 5,4 m = 61,79 kg rol 620,000.00
7 Wiremesh dia 8 (1 m2) = 5,448 kg m2 54,450.00
8 Wiremesh dia 10 m2 79,300.00
9 Wiremesh dia 10 2,1 x 5,4 = 96,55 kg rol 900,000.00
10 Bondek L. 1 M Tebal 0,75 mm m2 125,000.00
11 aksesoris mengerjakan besi hollo ls 5,000
12 Besi Siku 2,2 x 30 M¹ 22,000
13 Kawat Beton (Kawat Bidrat) Kg 26,400
14 elektroda RB 26 duz 200,000
15 Besi Beton Ulir Kg 26,000
16 Besi Beton Biasa (Polos), D 14 mm - 21 mm Kg 13,000
17 Besi Beton Biasa (Polos), D 6 mm - 12 mm Kg 13,000
18 Besi Hollow Galpanis 4x4 Batang 146,000
19 Besi Hollow Galpanis 2x4 Batang 119,000
20 Besi Hollow Galpanis 2x2 Batang 109,000
21 Plat Baja 3 mm (1.2x2.4) M² 71,000
22 Plat Baja 5 mm (1.2x2.4) M² 1,113,000
23 Plat Baja 5 mm M² 28,000
24 Baja WF 250 kg 17,200
25 Baja WF 200 kg 17,200
26 Baja WF 198 kg 17,200
27 Canal C 100x50x20z1,6 mm-6m kg 16,800
28 Canal C 100x50x20z 2,3 mm-6m kg 16,800
29 Canal C 75x35x15x1,6 mm-6m kg 16,800
30 baut dia 10 mm bh 5,000
31 Atap Spandek silver 0,55 mm M1 46,000
32 Lisplank Kalsiplan M1 28,000
33 Kawat Las kg 25,000
34 Paku Anti Karat untk Genteng Metal 35m2/kg Kg 60,000
35 Paku Kalsiboard/Gypsumboard Kg 42,000
36 Paku Beton Kg 60,000
37 Paku Sekrup Dos 65,000
38 Paku Tripleks uk 3/4 ktk 57,000
39 Paku Seng Kg 47,000
40 Paku Campuran (5,7,10 Cm) Kg 23,000
41 Alat Bantu set 8,000
BAHAN BAKAR
1 Minyak Solar HSD (Industri) + PPh Liter 12,380
2 Minyak Pelumas Liter 33,800
BAHAN KAYU
1 Papan Kayu Jati M3 4,547,000
2 Papan Kayu Klas II A (Sejenis) M3 2,360,000
3 Papan Kayu Klas II (Sejenis) M3 1,835,000
4 Papan Perancah M3 1,625,000
5 Balok Kayu Jati M3 4,250,000
6 Balok Kayu Klas II A (Sejenis) M3 2,360,000
7 Balok Kayu Klas II (Sejenis) M3 1,835,000
8 Dolken Ø 5 Cm Batang 6,000
9 Dolken Ø 10 Cm Batang 9,400
SANITASI
1 Kloset Duduk Dengan Tabung Set 5,000,000
2 Urinoir Set 2,850,000
3 Wastafel Meja Set 460,000
4 Sealtape bh 10,000
5 Stop Kran 1" Onda pcs 26,000
6 Stop Kran 1/2" Buah 20,300
7 Kran Air Kuningan ø 1/2" GI Buah 94,500
8 Kran Air Kuningan ø 3/4" GI Buah 63,000
9 Kran Air Biasa ø 1/2" GI Buah 17,500
10 Kran Air Biasa ø 3/4" GI Buah 14,000
15 Floor Drain Sen Ei Buah 110,000
16 Floor Drain Sen Lokal Buah 15,700
17 Floor Drain Buah 15,700
18 Stop Kran Ǿ 30 cm/12 Inci Buah 1,650,000
19 Floor Drain FLS 02 2" Buah 26,000
20 Floor Drain FLS 02 2" Buah 31,500
21 Air Bersih bisa diminum ltr 100
22 Profil Tank Stailes 1200 L bh 2,500,000
BAHAN KUNCI DAN PENGANTUNG
1 Engsel BLC 3" psg 39,600
2 Grendel Pintu Kuningan Buah 11,950
3 Kunci Tanam Antik Buah 184,500
BAHAN INSTALASI LISTRIK
1 Kabel NYM 1,5 mm, SNI Rol 35,000
2 Stop Kontak 2 lubang Setara Broco Buah 21,700
3 Saklar Tunggal, SNI Buah 22,050
4 Saklar Ganda, SNI Buah 25,200
5 Solasi Listrik Unibell Buah 2,100
6 Klem pipa 1/2" BH 2,500
7 Outbow Doos TM 20 mm Buah 5,250
8 Pipa 5/8 Batang 40,000
9 Inbow Dos TM 20 mm Buah 4,200
10 L Bow TM Buah 1,500
11 T Dos 4 Way 20 mm Buah 5,000
12 T Dos 3 Way 20 mm Buah 4,000
BAHAN ME & PLUMBING Alat Listrik Lainnya
1 Pipa PVC ø 1,5" (AW) 4 m Batang 91,750
2 Pipa PVC ø 1" (AW) 4 m Batang 60,250
3 Pipa PVC ø3/4" (AW) 4 m Batang 41,000
4 Pipa PVC ø 1/2" (AW) 4 m Batang 105,750
5 Pipa PVC ø 4" (AW) 4 m Batang 349,250
6 Pipa PVC ø 3" (AW) 4 m Batang 216,250
7 Pipa PVC ø 2,5" (AW) 4 m Batang 158,500
8 Pipa PVC ø 2" (AW) 4 m Batang 114,750
9 Pipa GIP Ǿ 50 cm/2 Inci (6 M) M'' 815,625
10 Pipa GIP Ǿ 65 cm/2,5 Inci (6 M) M'' 1,087,562
11 Pipa 6" Type AW panjang 6 meter batang 1,420,825
12 Pipa PPR PN 10 15 mm M 12,925
13 Pipa PPR PN 10 20 mm M 15,925
14 Pipa PPR PN 10 25 mm M 19,925
15 Pipa PPR PN 10 32 mm M 23,625
16 Pipa PPR PN 10 50 mm M 49,225
17 Pipa PPR PN 10 63 mm M 73,925
18 Pipa PPR PN 10 90 mm m 217,388
19 Pipa PPR PN 10 110 mm m 312,043
20 Pipa PPR PN 20 25 mm M 21,450
21 Pipa PPR PN 20 32 mm M 32,175
22 Gate Valve 32 mm Buah 1,600,000
23 Gate Valve 50 mm Buah 2,900,000
24 Gate Valve 1 1/2" Buah 1,100,000
25 Gate Valve 2" Buah 3,190,000
26 Check valve dia 2" bh 880,000
27 Foot valve dia 2" bh 440,000
28 Strainer dia. 2 1/2 " bh 2,800,000
29 Flexible Joint dia. 6" bh 1,600,000
30 Flexible Joint dia. 2 1/2" bh 858,000
31 Flexible Joint dia. 4" bh 1,300,000
32 Smoke detector pcs 310,000
33 Terminal Box Telepone 20 pair Unit 190,000
34 Pompa Booster Unit 4,000,000
35 Motor mechanism MT 100/160 Bh 7,000,000
36 ACB 800 A Bh 32,000,000
37 Busbar Bh 300,000
38 Wiring Acc. Bh 400,000
39 Grounding Bh 1,000,000
40 Grounding B 400,000
41 Alat Bantu 250,000
42 ATS UNIT 30,000,000
43 Grid Switch 8 Gang bh 200,000
Power Supply 220 V / 1 Ph / 50 Hz lengkap Arrester dan
44 set 230,200
pengkabelannya
45 Panel kontrol genset set 4,000,000
46 MCCB 250 A/3 Phasa Bh 3,850,000
47 MCCB 200 A/3 Phasa Bh 3,570,000
48 MCCB 160 A/3 Phasa Bh 3,400,000
49 MCCB 100 A/3 Phasa Bh 2,700,000
50 MCCB 80 A/3 Phasa Bh 2,300,000
51 MCCB 50 A/3 Phasa Bh 1,900,000
52 MCB 25 A/3 Phasa Bh 1,100,000
53 MCB 10 A/1 Phasa Bh 55,000
54 MCB 20 A/1 Phasa Bh 55,000
55 MCB 10 A/3 Phasa Bh 330,000
56 MCB 6 A/3 Phasa Bh 330,000
57 CT 150/5 Bh 270,000
58 CT 100/5 Bh 253,000
59 Pilot Lamp Bh 22,000
60 Fuse Bh 17,000
61 Voltmeter Analog Bh 82,500
62 Amperemeter Analog Bh 82,500
63 Powermeter Bh 4,500,000
64 Box Panel ( 180 x 60 x 20 ) cm Bh 5,000,000
65 Box Panel ( 80 x 60 x 20 ) cm Bh 1,050,000
66 Box Panel ( 50 x 40 x 20 ) cm Bh 536,250
67 Timer Omron Bh 275,000
68 Varlogic Bh 6,000,000
69 Capasitor 25 KVAR Bh 500,000
70 Contactor 3 phase unutk 25 KVAR Bh 1,650,000
71 LBS 630 A Bh 2,700,000
72 push button Bh 165,000
73 NYY 2 X (4 X 180) mm2 M 3,366,000
74 NYFGBY 4 x 16 mm2 M 140,800
75 FRC 4 x 1C x 25 mm2 M 296,700
76 NYY 4 x 6 mm2 M 39,000
77 NYY 4 x 4 mm2 M 29,000
78 NYY 4 x 70 mm2 M 640,000
79 NYY 4 x 10 mm2 M 29,500
80 NYY 4 x 25 mm2 M 15,000
81 Kabel NYA 2 x 1 x 1,5 mm2 M 8,200
82 Kabel NYA 2 x 1 x 2,5 mm2 M 7,920
83 Kabel NYA 3 X 2,5 mm2 M 11,000
84 Kabel NYMHY 2x2,5 mm2 M 12,100
85 Kabel NYM 3x2,5 mm2 mtr 12,100
86 Kabel NYM 4x4 mm2 mtr 29,700
87 kabel Grounding BCC 6 mm² m 18,000
88 BCC 10 mm² m 21,000
89 BCC 16 mm² m 35,000
90 BCC 50 mm² m 110,000
91 BCC 120 mm² m 350,000
92 Lampu TL 2 x 18 watt Bh 300,000
93 Lampu Downlight FBH032 5" 1 x 18 watt unit 210,000
94 lampu sorot LED 3 x 3 W set 1,056,000
95 Pipa Conduit ex Clipsal mtr 4,583
96 Pipa Flexible ex Clipsal mtr 6,490
97 Sok lurus Pipa ex Clipsal Bh 770
98 Tee Doos Bh 6,050
99 Klem Pipa Bh 715
100 Fisher + Sekrup Bh 275
101 Las Doop Bh 110
102 Isolasi listrik ex 3M Bh 27,500
103 Mur Baut Bh 11,000
104 Ceiling Speaker ex Toa (Zs-646R) unit 178,750
105 Column Speaker ex Toa (ZS-202C) unit 975,000
106 Paging Microphone ex Toa ZM-990 P unit 858,000
107 Amplifier ex TOA ZA 1360 SS unit 5,852,000
108 Amplifier ex TOA ZA 2240 PA unit 4,356,000
109 Level control ex TOA ZV-303 unit 178,750
110 Selector Speaker Switch ex TOA SS-10CH unit 4,455,000
111 Microphone Wireless Set ex Seinhesser SKM 9000 unit 2,972,750
112 CD Player + MP 3 unit 6,000,000
113 Paging Microphone & Chime Tone + Key Pad ( Car Call ) unit 2,600,000
114 Emergency Mic unit 1,200,000
115 Program Selector / Selector Switch unit 5,500,000
116 Kabinet Rack lengkap blower junction dan aksesories + unit 12,000,000
117 Power Supply lengkap dengan surge arrester & UPS kap 1 kW unit 5,000,000
118 Main Distibution Frame (MDF) Sound System unit 3,000,000
119 Cable ladder 600 x 100 M 85,000
120 Cable tray 400 x 100 M 230,000
121 Cable tray 200 x 100 M 153,908
122 Tee tray 400 x 400x 400 x 100 bh 492,000
123 Tee tray 200 x 200 x 200 x 100 bh 311,190
124 Jointing tray type W h=100 mm bh 25,300
125 Jointing tray type U h=100 mm bh 13,900
126 mur dan baut bh 1,265
127 Hanger beam 200 + hanger rod bh 30,000
128 Hanger beam 400 + hanger rod bh 40,000
129 Wall Bracket bh 34,155
3 x Ground Rod lapis tembaga 5/8" x 4 meter atau Tahanan lot 1,500,000
130 Pentanahan maks. 5 ohm

131 Lighting strike counter unit 4,750,000


Exhaust Fan kapasitas 1500 CMH Ruang Pompa ex KDK 40 Unit 1,001,000
132 AAS

133 Air Terminal Elektro Statik ( Cover Area R =150 m ) Bh 5,000,000


134 Galvanis Pipe 1" btng 200,000
135 Lampu Obstruction bh 1,200,000
Kabel konductor N2XSY 1x70 mm2 dalam Conduit PVC HI m 220,000
136
dia 20 mm
137 Beam Clamp + Support bh 150,000
138 Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol unit 2,000,000

139 Level control ex TOA ZV-303 unit 178,750


140 Selector Speaker Switch ex TOA SS-10CH unit 4,370,000
141 Profil Tank Stailes 1200 L exs Penguin bh 4,000,000
142 Mixer Pre Amplifier / Sistem Controller unit 10,000,000
143 Obstruction unit 9,000,000
144 Digital Multi Plexer 16 chanel set 3,335,000
145 Monitor LCD 21" unit 2,200,000
146 CD Recorder unit 2,288,000
147 Video Metric Switch Processor unit 3,300,000
148 Power Supply lengkap dengan surge arrester unit 2,000,000
149 UPS 1 KVA 30 menit unit 8,000,000
150 Indoor Dome Camera colour lensa + power supply unit 2,543,750
151 Indoor Fix Camera colour lensa 1/3" + power supply Unit 1,650,000
152 Instalasi CCTV UTP Cat 5 ( 4 pair )conduit PVC HI dia. 20 mm m' 70,331
153 Pomp Air buah 4,599,000
154 Pompa Air unit 1,404,900
155 Alat Pemadam Portable 1 Kg/DRF CH Minimax ABC/MS 6 unit 2,787,500
156 Alat Pemadam Portable 3 Kg/DRF CH Powder Minimax ABC/MS unit 3,122,000
ANALISA HARGA SATUAN
PEKERJAAN SANITASI
JDIH Kementrian PUPR 2022
1 Memasang 1 Buah Kloset Duduk / Monoblok
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.500 OH 110,000 55,000.00
Tukang Batu 1.100 OH 150,000 165,000.00
Kepala Tukang 0.010 OH 190,000 1,900.00
Mandor 0.1600 OH 150,000 24,000.00
JUMLAH HARGA TENAGA 245,900.00
B BAHAN
Kloset Duduk Dengan Tabung 1.000 Unit 5,000,000 5,000,000.00
%x Harga
Perlengkapan 0.06 5,000,000 300,000.00
Kloset
JUMLAH HARGA BAHAN 5,300,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 5,545,900.00
E Overhead dan Provit 15 % 831,885.00
F Harga Satuan Pekerjaan (D+E) 6,377,785.00

2 Memasang 1 Buah Urinoir


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1.000 OH 110,000 110,000.00
Tukang Batu 1.000 OH 150,000 150,000.00
Kepala Tukang 0.100 OH 190,000 19,000.00
Mandor 0.050 OH 150,000 7,500.00
JUMLAH HARGA TENAGA 286,500.00
B BAHAN
Urinoir Lengkap 1 Set ex. Toto 1.000 Unit 2,850,000 2,850,000.00
Semen Portland 6.000 Kg 1,640 9,840.00
Pasir Pasang 0.010 M3 170,000 1,700.00
JUMLAH HARGA BAHAN 2,861,540.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,148,040.00
E Overhead dan Provit 15 % 472,206.00
F Harga Satuan Pekerjaan (D+E) 3,620,246.00

3 Memasang 1 Buah Wastafel


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1.200 OH 110,000 132,000.00
Tukang Batu 1.450 OH 150,000 217,500.00
Kepala Tukang 0.150 OH 190,000 28,500.00
Mandor 0.060 OH 150,000 9,000.00
JUMLAH HARGA TENAGA 387,000.00
B BAHAN
Wastafel Meja 1.200 Bh 460,000 552,000.00
Semen Portland 6.000 Kg 1,640 9,840.00
Pasir Pasang 0.010 M3 170,000 1,700.00
JUMLAH HARGA BAHAN 563,540.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 950,540.00
E Overhead dan Provit 15 % 142,581.00
F Harga Satuan Pekerjaan (D+E) 1,093,121.00
4 Memasang 1 Buah Clen out
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 110,000 1,100.00
Tukang Batu 0.100 OH 150,000 15,000.00
Kepala Tukang 0.010 OH 190,000 1,900.00
Mandor 0.005 OH 150,000 750.00
JUMLAH HARGA TENAGA 18,750.00
B BAHAN
Clean Out 1.000 Bh 31,500 31,500.00

JUMLAH HARGA BAHAN 31,500.00


C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 50,250.00
E Overhead dan Provit 15 % 7,537.50
F Harga Satuan Pekerjaan (D+E) 57,787.50

5 Memasang 1 Buah Floor Drain


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 110,000 1,100.00
Tukang Batu 0.100 OH 150,000 15,000.00
Kepala Tukang 0.010 OH 190,000 1,900.00
Mandor 0.005 OH 150,000 750.00
JUMLAH HARGA TENAGA 18,750.00
B BAHAN
Floor Drain stainlesteel 1.000 Bh 26,000 26,000.00
-
JUMLAH HARGA BAHAN 26,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 44,750.00
E Overhead dan Provit 15 % 6,712.50
F Harga Satuan Pekerjaan (D+E) 51,462.50

6 Memasang 1 Buah Kran Diameter 3/4"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 110,000 1,100.00
Tukang Pipa 0.400 OH 150,000 60,000.00
Kepala Tukang 0.040 OH 190,000 7,600.00
Mandor 0.0050 OH 150,000 750.00
JUMLAH HARGA TENAGA 69,450.00
B BAHAN
Kran Air 3/4" (kuningan) 1.000 Bh 63,000 63,000.00
Sealtape 0.025 Bh 10,000 250.00
JUMLAH HARGA BAHAN 63,250.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 132,700.00
E Overhead dan Provit 15 % 19,905.00
F Harga Satuan Pekerjaan (D+E) 152,605.00
7 Memasang 1 Buah Kran Diameter 1/2"
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.010 OH 110,000 1,100.00
Tukang Pipa 0.400 OH 150,000 60,000.00
Kepala Tukang 0.040 OH 190,000 7,600.00
Mandor 0.0050 OH 150,000 750.00
JUMLAH HARGA TENAGA 69,450.00
B BAHAN
Kran Air 1/2" (kuningan) 1.000 Bh 94,500 94,500.00
Sealtape 0.025 Bh 10,000 250.00
JUMLAH HARGA BAHAN 94,750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 164,200.00
E Overhead dan Provit 15 % 24,630.00
F Harga Satuan Pekerjaan (D+E) 188,830.00

8 Memasang 1 M' Pipa PVC Tipe AW Diameter 1/2"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 110,000 5,940.00
Tukang Pipa 0.090 OH 150,000 13,500.00
Kepala Tukang 0.009 OH 190,000 1,710.00
Mandor 0.003 OH 150,000 450.00
JUMLAH HARGA TENAGA 21,600.00
B BAHAN
Pipa PVC Tipe AW Diameter 1/2" 1.200 M' 26,438 31,725.00
Perlengkapan 0.35 %x Harga Pipa 26,438 9,253.13
JUMLAH HARGA BAHAN 40,978.13
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 62,578.13
E Overhead dan Provit 15 % 9,386.72
F Harga Satuan Pekerjaan (D+E) 71,964.84

9 Memasang 1 M' Pipa PVC Tipe AW Diameter 3/4"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 110,000 5,940.00
Tukang Pipa 0.090 OH 150,000 13,500.00
Kepala Tukang 0.009 OH 190,000 1,710.00
Mandor 0.003 OH 150,000 450.00
JUMLAH HARGA TENAGA 21,600.00
B BAHAN
Pipa PVC Tipe AW Diameter 3/4" 1.200 M' 10,250 12,300.00
Perlengkapan 0.35 %x Harga Pipa 10,250 3,587.50
JUMLAH HARGA BAHAN 15,887.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 37,487.50
E Overhead dan Provit 15 % 5,623.13
F Harga Satuan Pekerjaan (D+E) 43,110.63
10 Memasang 1 M Pipa PVC Tipe AW Diameter 1"
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 110,000 3,960.00
Tukang Pipa 0.060 OH 150,000 9,000.00
Kepala Tukang 0.006 OH 190,000 1,140.00
Mandor 0.002 OH 150,000 300.00
JUMLAH HARGA TENAGA 14,400.00
B BAHAN
Pipa PVC Tipe AW Diameter 1" 1.200 M' 15,063 18,075.00
Perlengkapan 0.35 %x Harga Pipa 15,063 5,271.88
JUMLAH HARGA BAHAN 23,346.88
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 37,746.88
E Overhead dan Provit 15 % 5,662.03
F Harga Satuan Pekerjaan (D+E) 43,408.91

11 Memasang 1 M' Pipa PVC Tipe AW Diameter 1 1/2"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 110,000 5,940.00
Tukang Pipa 0.090 OH 150,000 13,500.00
Kepala Tukang 0.009 OH 190,000 1,710.00
Mandor 0.003 OH 150,000 450.00
JUMLAH HARGA TENAGA 21,600.00
B BAHAN
Pipa PVC Tipe AW Diameter 1 1/2" 1.200 M' 22,938 27,525.00
Perlengkapan 0.35 %x Harga Pipa 22,938 8,028.13
JUMLAH HARGA BAHAN 35,553.13
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 57,153.13
E Overhead dan Provit 15 % 8,572.97
F Harga Satuan Pekerjaan (D+E) 65,726.09

12 Memasang 1 M' Pipa PVC Tipe AW Diameter 2"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.054 OH 110,000 5,940.00
Tukang Pipa 0.090 OH 150,000 13,500.00
Kepala Tukang 0.009 OH 190,000 1,710.00
Mandor 0.003 OH 150,000 450.00
JUMLAH HARGA TENAGA 21,600.00
B BAHAN
Pipa PVC Tipe AW Diameter 2" 1.200 M' 28,688 34,425.00
Perlengkapan 0.35 %x Harga Pipa 28,688 10,040.63
JUMLAH HARGA BAHAN 44,465.63
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 66,065.63
E Overhead dan Provit 15 % 9,909.84
F Harga Satuan Pekerjaan (D+E) 75,975.47
13 Memasang 1 M' Pipa PVC Tipe AW Diameter 2 1/2"
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.004 OH 150,000 600.00
JUMLAH HARGA TENAGA 32,325.00
B BAHAN
Pipa PVC Tipe AW Diameter 2 1/2" 1.200 M' 39,625 47,550.00
Perlengkapan 0.35 %x Harga Pipa 39,625 13,868.75
JUMLAH HARGA BAHAN 61,418.75
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 93,743.75
E Overhead dan Provit 15 % 14,061.56
F Harga Satuan Pekerjaan (D+E) 107,805.31

14 Memasang 1 M' Pipa PVC Tipe AW Diameter 3"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.004 OH 150,000 600.00
JUMLAH HARGA TENAGA 32,325.00
B BAHAN
Pipa PVC Tipe AW Diameter 3" 1.200 M' 54,063 64,875.00
Perlengkapan 0.35 %x Harga Pipa 54,063 18,921.88
JUMLAH HARGA BAHAN 83,796.88
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 116,121.88
E Overhead dan Provit 15 % 17,418.28
F Harga Satuan Pekerjaan (D+E) 133,540.16

15 Memasang 1 M' Pipa PVC Tipe AW Diameter 4"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.0040 OH 150,000 600.00
JUMLAH HARGA TENAGA 32,325.00
B BAHAN
Pipa PVC Tipe AW Diameter 4" 1.200 M' 87,313 104,775.00
Perlengkapan 0.35 %x Harga Pipa 87,313 30,559.38
JUMLAH HARGA BAHAN 135,334.38
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 167,659.38
E Overhead dan Provit 15 % 25,148.91
F Harga Satuan Pekerjaan (D+E) 192,808.28
16 Memasang 1 M' Pipa PVC Tipe AW Diameter 6"
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.0035 OH 150,000 525.00
JUMLAH HARGA TENAGA 32,250.00
B BAHAN
Pipa PVC Tipe AW Diameter 6" 1.200 M' 236,804 284,165.00
Perlengkapan 0.35 %x Harga Pipa 236,804 82,881.46
JUMLAH HARGA BAHAN 367,046.46
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 399,296.46
E Overhead dan Provit 15 % 59,894.47
F Harga Satuan Pekerjaan (D+E) 459,190.93

17 Memasang 1 M' Pipa PPR PN 10 Diameter 50 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0140 OH 190,000 2,660.00
Mandor 0.0040 OH 150,000 600.00
JUMLAH HARGA TENAGA 32,420.00
B BAHAN
Pipa PPR PN 10 dia. 50 mm 1.200 M' 49,225 59,070.00
Perlengkapan 0.25 %x Harga Pipa 49,225 12,306.25
JUMLAH HARGA BAHAN 71,376.25
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 103,796.25
E Overhead dan Provit 15 % 15,569.44
F Harga Satuan Pekerjaan (D+E) 119,365.69

18 Memasang 1 M' Pipa PPR PN 10 Diameter 60 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0140 OH 190,000 2,660.00
Mandor 0.0040 OH 150,000 600.00
JUMLAH HARGA TENAGA 32,420.00
B BAHAN
Pipa PPR PN 10 dia. 60 mm 1.200 M' 73,925 88,710.00
Perlengkapan 0.25 %x Harga Pipa 73,925 18,481.25
JUMLAH HARGA BAHAN 107,191.25
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 139,611.25
E Overhead dan Provit 15 % 20,941.69
F Harga Satuan Pekerjaan (D+E) 160,552.94

19 Memasang 1 M' Pipa PPR PN 10 Diameter 32 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.0035 OH 150,000 525.00
JUMLAH HARGA TENAGA 32,250.00
B BAHAN
Pipa PPR PN 10 dia. 32 mm 1.200 M' 23,625 28,350.00
Perlengkapan 0.25 %x Harga Pipa 23,625 5,906.25
JUMLAH HARGA BAHAN 34,256.25
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 66,506.25
E Overhead dan Provit 15 % 9,975.94
F Harga Satuan Pekerjaan (D+E) 76,482.19
20 Memasang 1 M' Pipa PPR PN 10 Diameter 25 mm
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.0035 OH 150,000 525.00
JUMLAH HARGA TENAGA 32,250.00
B BAHAN
Pipa PPR PN 10 dia. 25 mm 1.200 M' 19,925 23,910.00
Perlengkapan 0.25 %x Harga Pipa 19,925 4,981.25
JUMLAH HARGA BAHAN 28,891.25
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 61,141.25
E Overhead dan Provit 15 % 9,171.19
F Harga Satuan Pekerjaan (D+E) 70,312.44

21 Memasang 1 M' Pipa PPR PN 10 Diameter 20 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.0035 OH 150,000 525.00
JUMLAH HARGA TENAGA 32,250.00
B BAHAN
Pipa PPR PN 10 dia. 20 mm 1.200 M' 15,925 19,110.00
Perlengkapan 0.25 %x Harga Pipa 15,925 3,981.25
JUMLAH HARGA BAHAN 23,091.25
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 55,341.25
E Overhead dan Provit 15 % 8,301.19
F Harga Satuan Pekerjaan (D+E) 63,642.44

22 Memasang 1 M' Pipa PPR PN 10 Diameter 15 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.0035 OH 150,000 525.00
JUMLAH HARGA TENAGA 32,250.00
B BAHAN
Pipa PPR PN 10 dia. 15 mm 1.200 M' 12,925 15,510.00
Perlengkapan 0.25 %x Harga Pipa 12,925 3,231.25
JUMLAH HARGA BAHAN 18,741.25
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 50,991.25
E Overhead dan Provit 15 % 7,648.69
F Harga Satuan Pekerjaan (D+E) 58,639.94

23 Memasang 1 M' Pipa PPR PN 20 Diameter 25 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 110,000 3,960.00
Tukang Pipa 0.060 OH 150,000 9,000.00
Kepala Tukang 0.0060 OH 190,000 1,140.00
Mandor 0.0020 OH 150,000 300.00
JUMLAH HARGA TENAGA 14,400.00
B BAHAN
Pipa PPR PN 20 dia. 25 mm 1.200 M' 21,450 25,740.00
Perlengkapan 0.25 %x Harga Pipa 21,450 5,362.50
JUMLAH HARGA BAHAN 31,102.50
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 45,502.50
E Overhead dan Provit 15 % 6,825.38
F Harga Satuan Pekerjaan (D+E) 52,327.88
24 Memasang 1 M' Pipa PPR PN 20 Diameter 32 mm
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 110,000 3,960.00
Tukang Pipa 0.060 OH 150,000 9,000.00
Kepala Tukang 0.0060 OH 190,000 1,140.00
Mandor 0.0020 OH 150,000 300.00
JUMLAH HARGA TENAGA 14,400.00
B BAHAN
Pipa PPR PN 20 dia. 25 mm 1.200 M' 32,175 38,610.00
Perlengkapan 0.25 %x Harga Pipa 32,175 8,043.75
JUMLAH HARGA BAHAN 46,653.75
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 61,053.75
E Overhead dan Provit 15 % 9,158.06
F Harga Satuan Pekerjaan (D+E) 70,211.81

25 Memasang 1 M' Pipa GIP Diameter 50 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 110,000 3,960.00
Tukang Pipa 0.060 OH 150,000 9,000.00
Kepala Tukang 0.0060 OH 190,000 1,140.00
Mandor 0.0020 OH 150,000 300.00
JUMLAH HARGA TENAGA 14,400.00
B BAHAN
Pipa GIP dia. 50 mm 1.200 M' 135,938 163,125.00

JUMLAH HARGA BAHAN 163,125.00


C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 177,525.00
E Overhead dan Provit 15 % 26,628.75
F Harga Satuan Pekerjaan (D+E) 204,153.75

26 Memasang 1 M' Pipa GIP Diameter 65 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.036 OH 110,000 3,960.00
Tukang Pipa 0.060 OH 150,000 9,000.00
Kepala Tukang 0.0060 OH 190,000 1,140.00
Mandor 0.0020 OH 150,000 300.00
JUMLAH HARGA TENAGA 14,400.00
B BAHAN
Pipa GIP dia. 65 mm 1.200 M' 181,260 217,512.40

JUMLAH HARGA BAHAN 217,512.40


C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 231,912.40
E Overhead dan Provit 15 % 34,786.86
F Harga Satuan Pekerjaan (D+E) 266,699.26
41 Memasang 1 Buah Gate Valve 2"
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1.430 OH 110,000 157,300.00
Tukang Pipa 0.720 OH 150,000 108,000.00
Mandor 0.1400 OH 150,000 21,000.00
JUMLAH HARGA TENAGA 286,300.00
B BAHAN
Gate Valve 2" 1.000 bh 3,190,000 3,190,000.00

JUMLAH HARGA BAHAN 3,190,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,476,300.00
E Overhead dan Provit 15 % 521,445.00
F Harga Satuan Pekerjaan (D+E) 3,997,745.00

42 Memasang 1 Buah Gate Valve 1,5"


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1.430 OH 110,000 157,300.00
Tukang Pipa 0.720 OH 150,000 108,000.00
Mandor 0.1400 OH 150,000 21,000.00
JUMLAH HARGA TENAGA 286,300.00
B BAHAN
Gate Valve 1,5" 1.000 bh 1,100,000 1,100,000.00

JUMLAH HARGA BAHAN 1,100,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,386,300.00
E Overhead dan Provit 15 % 207,945.00
F Harga Satuan Pekerjaan (D+E) 1,594,245.00

44 Memasang 1 Buah Gate Valve 32 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1.430 OH 110,000 157,300.00
Tukang Pipa 0.720 OH 150,000 108,000.00
Mandor 0.1400 OH 150,000 21,000.00
JUMLAH HARGA TENAGA 286,300.00
B BAHAN
Gate Valve 1" 1.000 bh 1,600,000 1,600,000.00

JUMLAH HARGA BAHAN 1,600,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,886,300.00
E Overhead dan Provit 15 % 282,945.00
F Harga Satuan Pekerjaan (D+E) 2,169,245.00

45 Pemasangan 1 Bh Titik Lampu


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Borongan 100.000 % bahan 214,650 214,650.00

JUMLAH HARGA TENAGA 214,650.00


B BAHAN
Pipa Listrik 5/8 3 bt 40,000.00 120,000.00
Kabel 24 m 350.00 8,400.00
T dus 3 bh 5,000.00 15,000.00
L Bow 4 bh 1,500.00 6,000.00
Klem 24 bh 2,500 60,000.00
Mangkok 1 bh 5,250 5,250.00
JUMLAH HARGA BAHAN 214,650.00
C PERALATAN
Perlengkapan -
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 429,300.00
E Overhead dan Provit 15 % 64,395.00
F Harga Satuan Pekerjaan (D+E) 493,695.00
ANALISA PEKERJAAN PIPA

ME - 42 Memasang 1 bh Gate Valve 2" drat


(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 bh Gate Valve 2" @ Rp 3,190,000.00 = Rp 3,190,000.00
Tenaga
1.43 Oh Pekerja @ Rp 110,000.00 = Rp 157,190.00
0.72 Oh Tukang Pipa @ Rp 190,000.00 = Rp 135,850.00
0.14 Oh Mandor @ Rp 150,000.00 = Rp 21,450.00
15.00 @ Rp 525,673.50 = Rp 525,673.50
Jumlah total = Rp 4,030,163.50
ME - 47 Memasang 1 bh Chek Valve 2"
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 bh Check Valve 2" @ Rp 880,000.00 = Rp 880,000.00
Tenaga
1.43 Oh Pekerja @ Rp 110,000.00 = Rp 157,190.00
0.72 Oh Tukang Pipa @ Rp 190,000.00 = Rp 135,850.00
0.14 Oh Mandor @ Rp 150,000.00 = Rp 21,450.00
15.00 @ Rp 179,173.50 = Rp 179,173.50
Jumlah total = Rp 1,373,663.50
ME - 50 Memasang 1 bh Foot Valve 2"
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 bh Foot Valve 2" @ Rp 440,000.00 = Rp 440,000.00
Tenaga
1.43 Oh Pekerja @ Rp 110,000.00 = Rp 157,190.00
0.72 Oh Tukang Pipa @ Rp 190,000.00 = Rp 135,850.00
0.14 Oh Mandor @ Rp 150,000.00 = Rp 21,450.00
15.00 @ Rp 113,173.50 = Rp 113,173.50
Jumlah total = Rp 867,663.50
ME - 52 Memasang 1 bh Strainer 2 1/2"
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 bh Strainer 2 1/2" @ Rp 2,800,000.00 = Rp 2,800,000.00
Tenaga
1.43 Oh Pekerja @ Rp 110,000.00 = Rp 157,190.00
0.72 Oh Tukang Pipa @ Rp 190,000.00 = Rp 135,850.00
0.14 Oh Mandor @ Rp 150,000.00 = Rp 21,450.00
15.00 @ Rp 467,173.50 = Rp 467,173.50
Jumlah total = Rp 3,581,663.50
ME - 53 Memasang 1 bh Flexible Joint 6"
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 bh Flexible Joint 6" @ Rp 1,600,000.00 = Rp 1,600,000.00
Tenaga
1.43 Oh Pekerja @ Rp 110,000.00 = Rp 157,190.00
0.72 Oh Tukang Pipa @ Rp 190,000.00 = Rp 135,850.00
0.14 Oh Mandor @ Rp 150,000.00 = Rp 21,450.00
15.00 @ Rp 287,173.50 = Rp 287,173.50
Jumlah total = Rp 2,201,663.50
ME - 54 Memasang 1 bH Flexible Joint 2 1/2"
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 bh Flexible Joint 2 1/2" @ Rp 858,000.00 = Rp 858,000.00
Tenaga
1.43 Oh Pekerja @ Rp 110,000.00 = Rp 157,190.00
0.72 Oh Tukang Pipa @ Rp 190,000.00 = Rp 135,850.00
0.14 Oh Mandor @ Rp 150,000.00 = Rp 21,450.00
15.00 @ Rp 175,873.50 = Rp 175,873.50
Jumlah total = Rp 1,348,363.50

Analisa pekerjaan fixture


ME - 63 1 bh Pasang CO dia 100 mm
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 Bh Clean Out dia 100 mm @ Rp 31,500.00 = Rp 31,500.00
Tenaga
0.01 OH Pekerja @ Rp 110,000.00 = Rp 1,100.00
0.10 OH Tukang Pipa @ Rp 150,000.00 = Rp 15,000.00
0.01 OH Kepala Tukang @ Rp 190,000.00 = Rp 1,900.00
0.01 OH Mandor @ Rp 150,000.00 = Rp 750.00
15.00 @ Rp 7,537.50 = Rp 7,537.50
Jumlah total Rp 57,787.50
ME - 64 1 bh Pasang CO dia 150 mm
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 Bh Clean Out dia 150 mm @ Rp 31,500.00 = Rp 31,500.00
Tenaga
0.01 OH Pekerja @ Rp 110,000.00 = Rp 1,100.00
0.10 OH Tukang Pipa @ Rp 150,000.00 = Rp 15,000.00
0.01 OH Kepala Tukang @ Rp 190,000.00 = Rp 1,900.00
0.01 OH Mandor @ Rp 150,000.00 = Rp 750.00
15.00 @ Rp 7,537.50 = Rp 7,537.50
Jumlah total Rp 57,787.50
ME - 65 1 bh Pasang Roof drain /unit
(PERMEN PU 18/PRT/M/2016)
Bahan
1.00 Bh Roof Drain @ Rp 110,000.00 = Rp 110,000.00
Tenaga
0.01 OH Pekerja @ Rp 110,000.00 = Rp 1,100.00
0.10 OH Tukang Pipa @ Rp 150,000.00 = Rp 15,000.00
0.01 OH Kepala Tukang @ Rp 190,000.00 = Rp 1,900.00
0.01 OH Mandor @ Rp 150,000.00 = Rp 750.00
15.00 @ Rp 19,312.50 = Rp 19,312.50
Jumlah total Rp 148,062.50

PANEL
ME - 66 1 Unit Panel Utama - LVMDP
(Analisa Lapangan)
1.00 Bh ACB 800 A 4 P @ Rp 32,000,000.00 = Rp 32,000,000.00
1.00 Bh ATS @ Rp 30,000,000.00 = Rp 30,000,000.00
2.00 Bh MCCB 160 A/3 Phasa @ Rp 3,400,000.00 = Rp 6,800,000.00
3.00 Bh MCCB 100 A/3 Phasa @ Rp 2,700,000.00 = Rp 8,100,000.00
3.00 Bh MCCB 80 A/3 Phasa @ Rp 2,300,000.00 = Rp 6,900,000.00
5.00 Bh MCCB 50 A/3 Phasa @ Rp 1,900,000.00 = Rp 9,500,000.00
1.00 Bh Motor Mechanism MT 100/1 @ Rp 7,000,000.00 = Rp 7,000,000.00
6.00 Bh CT 150/5 @ Rp 270,000.00 = Rp 1,620,000.00
1.00 Bh Powermeter @ Rp 4,500,000.00 = Rp 4,500,000.00
6.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 132,000.00
6.00 Bh Fuse @ Rp 17,000.00 = Rp 102,000.00
3.00 Unit Box Panel & Accessories @ Rp 1,050,000.00 = Rp 3,150,000.00
1.00 ls Busbar @ Rp 300,000.00 = Rp 300,000.00
1.00 ls Wiring Acc. @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Grounding @ Rp 1,000,000.00 = Rp 1,000,000.00
3.00 Hr Mandor @ Rp 150,000.00 = Rp 450,000.00
6.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 1,140,000.00
12.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 1,800,000.00
15.00 Rp 17,234,100.00 = Rp 17,234,100.00
Jumlah total = Rp 132,128,100.00
ME - 68 1 Unit Panel - PP AB
(Analisa Lapangan)
1.00 Bh MCB 25 A/3 Phasa @ Rp 1,100,000.00 = Rp 1,100,000.00
1.00 Bh MCB 6 A/3 Phasa @ Rp 330,000.00 = Rp 330,000.00
1.00 Bh MCB 10 A/1 Phasa @ Rp 330,000.00 = Rp 330,000.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
1.00 Bh Fuse @ Rp 17,000.00 = Rp 17,000.00
1.00 Bh Box Panel ( 50 x 40 x 20 ) c @ Rp 536,250.00 = Rp 536,250.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
1.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 150,000.00
15.00 Rp 527,887.50 = Rp 527,887.50
Jumlah total = Rp 4,047,137.50

ME - 68 1 Unit Panel - PP STP


(Analisa Lapangan)
1.00 Bh MCB 25 A/3 Phasa @ Rp 1,100,000.00 = Rp 1,100,000.00
1.00 Bh MCB 6 A/3 Phasa @ Rp 330,000.00 = Rp 330,000.00
1.00 Bh MCB 10 A/1 Phasa @ Rp 330,000.00 = Rp 330,000.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
1.00 Bh Fuse @ Rp 17,000.00 = Rp 17,000.00
1.00 Bh Box Panel ( 50 x 40 x 20 ) c @ Rp 536,250.00 = Rp 536,250.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
1.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 150,000.00
15.00 Rp 527,887.50 = Rp 527,887.50
Jumlah total = Rp 4,047,137.50

ME - 68 1 Unit Panel - PP SDP


(Analisa Lapangan)
1.00 Bh ACB 380 KV @ Rp 1,100,000.00 = Rp 1,100,000.00
3.00 Bh MCB 6 A/3 Phasa @ Rp 330,000.00 = Rp 990,000.00
3.00 Bh MCB 10 A/1 Phasa @ Rp 330,000.00 = Rp 990,000.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
1.00 Bh Fuse @ Rp 17,000.00 = Rp 17,000.00
1.00 Bh Box Panel ( 50 x 40 x 20 ) c @ Rp 536,250.00 = Rp 536,250.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
1.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 150,000.00
15.00 Rp 725,887.50 = Rp 725,887.50
Jumlah total = Rp 5,565,137.50
ME - 69 1 Unit Panel - PP POMPA TRANSFER
(Analisa Lapangan)
2.00 Bh MCB 25 A/3 Phasa @ Rp 1,100,000.00 = Rp 2,200,000.00
2.00 Bh MCB 10 A/1 Phasa @ Rp 330,000.00 = Rp 660,000.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
3.00 Bh Fuse @ Rp 17,000.00 = Rp 51,000.00
1.00 Bh Box Panel ( 50 x 40 x 20 ) c @ Rp 536,250.00 = Rp 536,250.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
1.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 150,000.00
15.00 Rp 697,987.50 = Rp 697,987.50
Jumlah total = Rp 5,351,237.50
ME - 70 1 Unit Panel - PP AC Lantai 01
(Analisa Lapangan)
1.00 Bh MCCB 100 A/3 Phasa @ Rp 2,700,000.00 = Rp 2,700,000.00
4.00 Bh MCB 10 A/1 Phasa @ Rp 55,000.00 = Rp 220,000.00
4.00 Bh MCB 20 A/1 Phasa @ Rp 55,000.00 = Rp 220,000.00
4.00 Bh MCB 10 A/3 Phasa @ Rp 330,000.00 = Rp 1,320,000.00
3.00 Bh Amperemeter @ Rp 82,500.00 = Rp 247,500.00
1.00 Bh Voltmeter @ Rp 82,500.00 = Rp 82,500.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
3.00 Bh Fuse @ Rp 17,000.00 = Rp 51,000.00
3.00 Bh CT 100/5 @ Rp 253,000.00 = Rp 759,000.00
1.00 Bh Box Panel ( 80 x 60 x 20 ) c @ Rp 1,050,000.00 = Rp 1,050,000.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
2.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 300,000.00
15.00 Rp 1,200,900.00 = Rp 1,200,900.00
Jumlah total = Rp 9,206,900.00

ME - 71 1 Unit Panel - PP AC lantai 02


(Analisa Lapangan)
1.00 Bh MCCB 100 A/3 Phasa @ Rp 2,700,000.00 = Rp 2,700,000.00
4.00 Bh MCB 10 A/1 Phasa @ Rp 55,000.00 = Rp 220,000.00
4.00 Bh MCB 20 A/1 Phasa @ Rp 55,000.00 = Rp 220,000.00
4.00 Bh MCB 10 A/3 Phasa @ Rp 330,000.00 = Rp 1,320,000.00
3.00 Bh Amperemeter @ Rp 82,500.00 = Rp 247,500.00
1.00 Bh Voltmeter @ Rp 82,500.00 = Rp 82,500.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
3.00 Bh Fuse @ Rp 17,000.00 = Rp 51,000.00
3.00 Bh CT 100/5 @ Rp 253,000.00 = Rp 759,000.00
1.00 Bh Box Panel ( 80 x 60 x 20 ) c @ Rp 1,050,000.00 = Rp 1,050,000.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
2.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 300,000.00
15.00 Rp 1,200,900.00 = Rp 1,200,900.00
Jumlah total = Rp 9,206,900.00
ME - 72 1 Unit Panel - PP AC lantai 03
(Analisa Lapangan)
1.00 Bh MCCB 100 A/3 Phasa @ Rp 2,700,000.00 = Rp 2,700,000.00
3.00 Bh MCB 10 A/1 Phasa @ Rp 55,000.00 = Rp 165,000.00
2.00 Bh MCB 20 A/1 Phasa @ Rp 55,000.00 = Rp 110,000.00
2.00 Bh MCB 6 A/3 Phasa @ Rp 330,000.00 = Rp 660,000.00
6.00 Bh MCB 10 A/3 Phasa @ Rp 55,000.00 = Rp 330,000.00
3.00 Bh Amperemeter @ Rp 82,500.00 = Rp 247,500.00
1.00 Bh Voltmeter @ Rp 82,500.00 = Rp 82,500.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
3.00 Bh Fuse @ Rp 17,000.00 = Rp 51,000.00
3.00 Bh CT 100/5 @ Rp 253,000.00 = Rp 759,000.00
1.00 Bh Box Panel ( 80 x 60 x 20 ) c @ Rp 1,050,000.00 = Rp 1,050,000.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
2.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 300,000.00
15.00 Rp 1,126,650.00 = Rp 1,126,650.00
Jumlah total = Rp 8,637,650.00
ME - 73 1 Unit Panel - PP Lantai 01
(Analisa Lapangan)
1.00 Bh MCCB 80 A/3 Phasa @ Rp 2,300,000.00 = Rp 2,300,000.00
1.00 Bh MCB 20 A/1 Phasa @ Rp 55,000.00 = Rp 55,000.00
9.00 Bh MCB 10 A/1 Phasa @ Rp 55,000.00 = Rp 495,000.00
1.00 Bh timer @ Rp 275,000.00 = Rp 275,000.00
3.00 Bh Amperemeter @ Rp 82,500.00 = Rp 247,500.00
1.00 Bh Voltmeter @ Rp 82,500.00 = Rp 82,500.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
3.00 Bh Fuse @ Rp 17,000.00 = Rp 51,000.00
3.00 Bh CT 100/5 @ Rp 253,000.00 = Rp 759,000.00
1.00 Bh Box Panel ( 80 x 60 x 20 ) c @ Rp 1,050,000.00 = Rp 1,050,000.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.50 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 285,000.00
3.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 450,000.00
15.00 Rp 1,037,400.00 = Rp 1,037,400.00
Jumlah total = Rp 7,953,400.00
ME - 74 1 Unit Panel - PP Lantai 02
(Analisa Lapangan)
1.00 Bh MCCB 100 A/3 Phasa @ Rp 2,700,000.00 = Rp 2,700,000.00
1.00 Bh MCB 20 A/1 Phasa @ Rp 55,000.00 = Rp 55,000.00
7.00 Bh MCB 10 A/1 Phasa @ Rp 55,000.00 = Rp 385,000.00
1.00 Bh timer @ Rp 275,000.00 = Rp 275,000.00
3.00 Bh Amperemeter @ Rp 82,500.00 = Rp 247,500.00
1.00 Bh Voltmeter @ Rp 82,500.00 = Rp 82,500.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
3.00 Bh Fuse @ Rp 17,000.00 = Rp 51,000.00
3.00 Bh CT 150/5 @ Rp 253,000.00 = Rp 759,000.00
1.00 Bh Box Panel ( 80 x 60 x 20 ) c @ Rp 1,050,000.00 = Rp 1,050,000.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.50 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 285,000.00
3.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 450,000.00
15.00 Rp 1,080,900.00 = Rp 1,080,900.00
Jumlah total = Rp 8,286,900.00
ME - 75 1 Unit Panel - PP Lantai 03
(Analisa Lapangan)
1.00 Bh MCCB 80 A/3 Phasa @ Rp 2,700,000.00 = Rp 2,700,000.00
1.00 Bh MCB 20 A/1 Phasa @ Rp 55,000.00 = Rp 55,000.00
8.00 Bh MCB 10 A/1 Phasa @ Rp 55,000.00 = Rp 440,000.00
1.00 Bh timer @ Rp 275,000.00 = Rp 275,000.00
3.00 Bh Amperemeter @ Rp 82,500.00 = Rp 247,500.00
1.00 Bh Voltmeter @ Rp 82,500.00 = Rp 82,500.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
3.00 Bh Fuse @ Rp 17,000.00 = Rp 51,000.00
3.00 Bh CT 150/5 @ Rp 253,000.00 = Rp 759,000.00
1.00 Bh Box Panel ( 80 x 60 x 20 ) c @ Rp 1,050,000.00 = Rp 1,050,000.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.50 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 285,000.00
3.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 450,000.00
15.00 Rp 1,089,150.00 = Rp 1,089,150.00
Jumlah total = Rp 8,350,150.00

ME - 76 1 Unit Panel - Kamar per lantai


(Analisa Lapangan)
5.00 Bh MCB 10 A/1 Phasa @ Rp 55,000.00 = Rp 275,000.00
1.00 Bh Contactor 1 phase 16 A @ Rp 500,000.00 = Rp 500,000.00
1.00 Bh Box panel ex Hager @ Rp 536,250.00 = Rp 536,250.00
0.02 Hr Mandor @ Rp 150,000.00 = Rp 2,500.00
0.17 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 31,666.67
0.50 Hr Tukang Listrik @ Rp 150,000.00 = Rp 75,000.00
15.00 Rp 213,062.50 = Rp 213,062.50
Jumlah total = Rp 1,633,479.17
ME - 77 1 Unit CAPASITOR BANK
(Analisa Lapangan)
1.00 Bh VAR logic @ Rp 6,000,000.00 = Rp 6,000,000.00
6.00 Bh Capasitor 25 KVAR @ Rp 500,000.00 = Rp 3,000,000.00
6.00 Bh Contactor 3 phase unutk 25 @ Rp 1,650,000.00 = Rp 9,900,000.00
6.00 Bh MCCB 50 A @ Rp 1,900,000.00 = Rp 11,400,000.00
1.00 Bh LBS 630 A @ Rp 2,700,000.00 = Rp 2,700,000.00
6.00 Bh Push Button Schneider @ Rp 165,000.00 = Rp 990,000.00
1.00 ls Busbar @ Rp 300,000.00 = Rp 300,000.00
1.00 ls Wiring Acc. @ Rp 400,000.00 = Rp 400,000.00
6.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 132,000.00
2.00 Unit Box Panel & Accessories @ Rp 1,050,000.00 = Rp 2,100,000.00
2.00 Hr Mandor @ Rp 150,000.00 = Rp 300,000.00
4.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 760,000.00
6.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 900,000.00
15.00 Rp 5,832,300.00 = Rp 5,832,300.00
Jumlah total = Rp 44,714,300.00
Analisa intalasi Kabel

ME - 86 1 m' Kabel Kabel FRC 4 x 1C x 25 mm2


(Analisa Lapangan)
Bahan
Kabel FRC 4 x 1C x 25
1.00 M' @ Rp 296,700.00 = Rp 296,700.00
mm2
Tenaga
0.03 Hr Mandor @ Rp 150,000.00 = Rp 4,500.00
0.05 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 9,500.00
0.05 Hr Tukang @ Rp 150,000.00 = Rp 7,500.00
15.00 Rp 47,730.00 = Rp 47,730.00
Jumlah total = Rp 365,930.00
ME - 87 1 m' Kabel NYMHY 2 x 1,5 mm
(Analisa Lapangan)
Bahan
1.00 M' Kabel NYMHY 2 x 1,5 mm @ Rp 8,200.00 = Rp 8,200.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 2,475.00 = Rp 2,475.00
Jumlah total = Rp 18,975.00
ME - 88 1 m' Kabel NYY 4 x 6 mm
(Analisa Lapangan)
Bahan
1.00 M' Kabel NYY 4 x 6 mm @ Rp 39,000.00 = Rp 39,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 7,095.00 = Rp 7,095.00
Jumlah total = Rp 54,395.00
ME - 88 1 m' Kabel NYY 4 x 4 mm
(Analisa Lapangan)
Bahan
1.00 M' Kabel NYY 4 x 6 mm @ Rp 29,000.00 = Rp 29,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 5,595.00 = Rp 5,595.00
Jumlah total = Rp 42,895.00

ME - 88 1 m' Kabel NYY 4 x 16 mm


(Analisa Lapangan)
Bahan
1.00 M' Kabel NYY 4 x 16 mm @ Rp 140,800.00 = Rp 140,800.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 22,365.00 = Rp 22,365.00
Jumlah total = Rp 171,465.00
ME - 89 1 m' Kabel NYY 2 x 4X1X1,2 50 mm
(Analisa Lapangan)
Bahan
1.00 M' Kabel NYY 2 ( 4X1X1,2) mm @ Rp 3,366,000.00 = Rp 3,366,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 506,145.00 = Rp 506,145.00
Jumlah total = Rp 3,880,445.00

ME - 89 1 m' Kabel NYY 4 X 10


(Analisa Lapangan)
Bahan
1.00 M' Kabel NYY 4 X 10 @ Rp 29,500.00 = Rp 29,500.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 5,670.00 = Rp 5,670.00
Jumlah total = Rp 43,470.00

ME - 89 1 m' Kabel NYY 4 X 70


(Analisa Lapangan)
Bahan
1.00 M' Kabel NYY 4 X 70 mm @ Rp 640,000.00 = Rp 640,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 97,245.00 = Rp 97,245.00
Jumlah total = Rp 745,545.00
ME - 89 1 m' Kabel NYY 4 X 25
(Analisa Lapangan)
Bahan
1.00 M' Kabel NYY 4 X 25 mm @ Rp 15,000.00 = Rp 15,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 3,495.00 = Rp 3,495.00
Jumlah total = Rp 26,795.00

ME - 89 1 m' Kabel NYA 2 x 1 x 1,5 mm2


(Analisa Lapangan)
Bahan
1.00 M' Kabel NYA 2 x 1 x 1,5 mm2 @ Rp 8,200.00 = Rp 8,200.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 2,475.00 = Rp 2,475.00
Jumlah total = Rp 18,975.00

ME - 89 1 m' Kabel NYA 2 x 3 x 2,5 mm2


(Analisa Lapangan)
Bahan
1.00 M' Kabel NYA 2 x 1 x 1,5 mm2 @ Rp 11,000.00 = Rp 11,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.02 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 3,800.00
0.02 Hr Tukang @ Rp 150,000.00 = Rp 3,000.00
15.00 Rp 2,895.00 = Rp 2,895.00
Jumlah total = Rp 22,195.00

Jumlah total =
ME - 93 1 m' Kabel Tray Lebar uk. 400 x 100
1.00
Bahan
1.00 M' Kabel Tray Lebar 400 x 100 @ Rp 230,000.00 = Rp 230,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.10 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 19,000.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 42,075.00 = Rp 42,075.00
Jumlah total = Rp 322,575.00
ME - 94 1 m' Kabel Tray Lebar uk. 200 x 100
1.00
Bahan
1.00 M' Kabel Tray Lebar 200 x 100 @ Rp 153,908.33 = Rp 153,908.33
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.10 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 19,000.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 30,661.25 = Rp 30,661.25
Jumlah total = Rp 235,069.58
ME - 95 1 m' Kabel Ladder uk. 600 x 100
1.00
Bahan
1.00 M' Kabel Tray Lebar 600 x 100 @ Rp 85,000.00 = Rp 85,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.10 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 19,000.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 20,325.00 = Rp 20,325.00
Jumlah total = Rp 155,825.00

Analisa intalasi ME
ME - 98 1 titik instalasi Penerangan Dalam bangunan
1.00
Bahan
6.00 M' Kabel NYM 3x2,5 mm2 @ Rp 12,100.00 = Rp 72,600.00
6.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 27,500.00
1.00 M' Pipa Flexible @ Rp 4,583.33 = Rp 4,583.33
2.00 Bh Tee Doos @ Rp 6,050.00 = Rp 12,100.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
3.00 Bh Las Doop @ Rp 110.00 = Rp 330.00
0.20 Bh Isolasi Listrik @ Rp 27,500.00 = Rp 5,500.00
Tenaga
0.17 Hr Mandor @ Rp 150,000.00 = Rp 25,500.00
0.30 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang @ Rp 150,000.00 = Rp 45,000.00
15.00 Rp 38,086.25 = Rp 38,086.25
Jumlah total = Rp 291,994.58
ME - 100 1 titik instalasi Stop Kontak
1.00
Bahan
12.00 M' Kabel NYM 3x2,5 mm2 @ Rp 12,100.00 = Rp 145,200.00
12.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 55,000.00
1.00 M' Pipa Flexible @ Rp 4,583.33 = Rp 4,583.33
2.00 Bh Tee Doos @ Rp 6,050.00 = Rp 12,100.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
2.00 Bh Las Doop @ Rp 110.00 = Rp 220.00
0.20 Bh Isolasi Listrik @ Rp 27,500.00 = Rp 5,500.00
Tenaga
0.17 Hr Mandor @ Rp 150,000.00 = Rp 25,500.00
0.30 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang @ Rp 150,000.00 = Rp 45,000.00
15.00 Rp 53,084.75 = Rp 53,084.75
Jumlah total = Rp 406,983.08
ME - 101 1 titik instalasi speaker
1.00
Bahan
10.00 M' Kabel NYMHY 2x1,5 mm2 @ Rp 8,200.00 = Rp 82,000.00
10.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 45,833.33
3.00 Bh Socket Pipa @ Rp 4,583.33 = Rp 13,750.00
2.00 Bh Tee Doos @ Rp 6,050.00 = Rp 12,100.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
Tenaga
0.17 Hr Mandor @ Rp 150,000.00 = Rp 25,500.00
0.30 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang @ Rp 150,000.00 = Rp 45,000.00
15.00 Rp 42,746.75 = Rp 42,746.75
Jumlah total = Rp 327,725.08
ME - 102 1 TITIK PEMASANGAN INSTALASI CCTV
1.00
(Dari Switch Poe Ke Kamera CCTV)
Bahan
26.00 m' Kabel UTP cat. 6 @ Rp 6,852.46 = Rp 178,163.93
26.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 119,166.67
4.00 bh sok lurus @ Rp 770.00 = Rp 3,080.00
2.00 bh Connector RJ 45 @ Rp 11,000.00 = Rp 22,000.00
6.00 Bh Klem Pipa @ Rp 715.00 = Rp 4,290.00
12.00 bh Fisher + Sekrup @ Rp 275.00 = Rp 3,300.00
1.00 M' Flexible Conduit @ Rp 6,490.00 = Rp 6,490.00
Tenaga
0.70 o/hr Pekerja @ Rp 150,000.00 = Rp 105,000.00
0.40 o/hr Tukang listrik @ Rp 190,000.00 = Rp 76,000.00
0.04 o/hr Mandor @ Rp 150,000.00 = Rp 6,000.00
15.00 Rp 78,523.59 = Rp 78,523.59
Jumlah total Rp 602,014.19
ME - 103 1 M' INSTALASI KABEL UTP CAT. 6
1.00
Bahan
1.00 m' Kabel UTP cat. 6 @ Rp 6,852.46 = Rp 6,852.46
1.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 4,583.33
0.50 bh sok lurus @ Rp 770.00 = Rp 385.00
0.50 bh Connector RJ 45 @ Rp 11,000.00 = Rp 5,500.00
0.30 M' Pipa Flexible @ Rp 6,490.00 = Rp 1,947.00
1.00 Bh Klem Pipa @ Rp 715.00 = Rp 715.00
2.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 550.00
Tenaga
0.02 o/hr Pekerja @ Rp 150,000.00 = Rp 2,250.00
0.15 o/hr Tukang listrik @ Rp 190,000.00 = Rp 28,500.00
0.20 o/hr Mandor @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 12,192.42 = Rp 12,192.42
Jumlah total Rp 93,475.21
ME - 104 1 titik instalasi MATV
1.00
Bahan
16.00 M' Kabel Coaxial RG 6 5C @ Rp 11,995.41 = Rp 191,926.56
16.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 73,333.33
3.00 bh sok lurus @ Rp 770.00 = Rp 2,310.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
0.25 M' Flexible Conduit @ Rp 6,490.00 = Rp 1,622.50
Tenaga
0.70 Hr Mandor @ Rp 150,000.00 = Rp 105,000.00
0.40 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 76,000.00
0.04 Hr Tukang @ Rp 150,000.00 = Rp 6,000.00
15.00 Rp 68,998.11 = Rp 68,998.11
Jumlah total = Rp 528,985.50
ME - 105 1 m' Kabel Coaxial RG-11 ( 7 C /2V )
1.00
Bahan
1.00 M' Kabel Coaxial RG 11 7C @ Rp 11,000.00 = Rp 11,000.00
1.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 4,583.33
0.30 M' Pipa Flexible @ Rp 6,490.00 = Rp 1,947.00
1.00 Bh Klem Pipa @ Rp 715.00 = Rp 715.00
2.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 550.00
Tenaga
0.02 Hr Mandor @ Rp 150,000.00 = Rp 2,250.00
0.15 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 28,500.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 11,931.80 = Rp 11,931.80
Jumlah total = Rp 91,477.13

Analisa Armature ME ( Saklar dan Stop Kontak)


ME - 121 1 Bh Saklar Tunggal
1.00
Bahan
1.00 Bh Saklar Tunggal 10 A @ Rp 22,050.00 = Rp 22,050.00
Tenaga
0.03 Hr Mandor @ Rp 150,000.00 = Rp 4,500.00
0.05 Hr Kepala tukang @ Rp 190,000.00 = Rp 9,500.00
0.05 Hr Tukang Listrik @ Rp 150,000.00 = Rp 7,500.00
15.00 @ Rp 6,532.50 = Rp 6,532.50
Jumlah total = Rp 50,082.50
ME - 122 1 Bh Saklar Ganda
1.00
Bahan
1.00 Bh Saklar Ganda 10 A @ Rp 25,200.00 = Rp 25,200.00
Tenaga
0.03 Hr Mandor @ Rp 150,000.00 = Rp 4,500.00
0.05 Hr Kepala tukang @ Rp 190,000.00 = Rp 9,500.00
0.05 Hr Tukang Listrik @ Rp 150,000.00 = Rp 7,500.00
15.00 @ Rp 7,005.00 = Rp 7,005.00
Jumlah total = Rp 53,705.00
ME - 124 1 Bh Stop Kontak 1 Phase
1.00
Bahan
1.00 Bh Stop Kontak 10/16 A @ Rp 21,700.00 = Rp 21,700.00
Tenaga
0.03 Hr Mandor @ Rp 150,000.00 = Rp 4,500.00
0.05 Hr Kepala tukang @ Rp 190,000.00 = Rp 9,500.00
0.05 Hr Tukang Listrik @ Rp 150,000.00 = Rp 7,500.00
15.00 @ Rp 6,480.00 = Rp 6,480.00
Jumlah total = Rp 49,680.00
ME - 130 1 Bh Terminal Box 20 pair
1.00
Bahan
1.00 Bh Terminal Box @ Rp 190,000.00 = Rp 190,000.00
Tenaga
0.15 Hr Mandor @ Rp 150,000.00 = Rp 22,500.00
0.30 Hr Kepala tukang @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang Listrik @ Rp 150,000.00 = Rp 45,000.00
15.00 @ Rp 47,175.00 = Rp 47,175.00
Jumlah total = Rp 361,675.00
ME - 131 1 Bh MDF 100 pair
1.00
Bahan
1.00 Bh MDF 100 pair @ Rp - = Rp -
Tenaga
0.15 Hr Mandor @ Rp 150,000.00 = Rp 22,500.00
0.30 Hr Kepala tukang @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang Listrik @ Rp 150,000.00 = Rp 45,000.00
15.00 @ Rp 18,675.00 = Rp 18,675.00
Jumlah total = Rp 143,175.00

Analisa Armature ME ( lampu)


ME - 135 1 Bh pekerjaan Lampu TK 1 x 18 watt Surface Mounted
1.00
Bahan
1.00 Bh TK 1 x 18 watt Surface @ Rp 440,000.00 = Rp 440,000.00
Mounted
Tenaga
0.03 Hr Mandor @ Rp 150,000.00 = Rp 4,950.00
0.07 Hr Kepala tukang @ Rp 190,000.00 = Rp 12,730.00
0.07 Hr Tukang Listrik @ Rp 150,000.00 = Rp 10,050.00
15.00 @ Rp 70,159.50 = Rp 70,159.50
Jumlah total = Rp 537,889.50
ME - 136 1 Bh pekerjaan Lampu TL 2 x 18 watt
1.00
Bahan
1.00 Bh Lampu TL 2 x 18 watt @ Rp 300,000.00 = Rp 300,000.00
Tenaga
0.03 Hr Mandor @ Rp 150,000.00 = Rp 4,950.00
0.07 Hr Kepala tukang @ Rp 190,000.00 = Rp 12,730.00
0.07 Hr Tukang Listrik @ Rp 150,000.00 = Rp 10,050.00
15.00 @ Rp 49,159.50 = Rp 49,159.50
Jumlah total = Rp 376,889.50

ME - 139 1 Bh pekerjaan Lampu Downlight FBH032 5" 1 x 18 watt


1.00
Bahan
1.00 Bh Lampu Downlight FBH032 @ Rp 210,000.00 = Rp 210,000.00
5" 1 x 18 watt
Tenaga
0.03 Hr Mandor @ Rp 150,000.00 = Rp 4,950.00
0.07 Hr Kepala tukang @ Rp 190,000.00 = Rp 12,730.00
0.07 Hr Tukang Listrik @ Rp 150,000.00 = Rp 10,050.00
15.00 @ Rp 35,659.50 = Rp 35,659.50
Jumlah total = Rp 273,389.50

Analisa Armature ME (FIRE ALARM SYSTEM)


ME - 150 1 Bh pekerjaan Smoke Detector
1.00
Bahan
1.00 Bh smoke detector HS-202D @ Rp 310,000.00 = Rp 310,000.00
Tenaga
0.08 Hr Mandor @ Rp 150,000.00 = Rp 12,000.00
0.17 Hr Kepala tukang @ Rp 190,000.00 = Rp 32,300.00
0.17 Hr Tukang Listrik @ Rp 150,000.00 = Rp 25,500.00
15.00 @ Rp 56,970.00 = Rp 56,970.00
Jumlah total = Rp 436,770.00

Analisa Armature ME Tata Suara


ME - 157 Pemasangan 1 bh Ceiling Speaker
1.00
1.00 Bh Ceiling Speker (Zs-646R) @ Rp 178,750.00 = Rp 178,750.00
0.07 Hr Mandor @ Rp 150,000.00 = Rp 10,500.00
0.10 Hr Kepala Tukang Listrik @ Rp 190,000.00 = Rp 19,000.00
0.15 Hr Tukang @ Rp 150,000.00 = Rp 22,500.00
15.00 @ Rp 34,612.50 = Rp 34,612.50
@ Jumlah total = Rp 265,362.50
ME - 158 Pemasangan 1 bh Column Ceiling
1.00
1.00 Bh Column Speaker ex Toa @ Rp 975,000.00 =
Rp 975,000.00
(ZS-202C)
0.07 Hr Mandor @ Rp 150,000.00 = Rp 10,500.00
0.10 Hr Kepala Tukang Listrik @ Rp 190,000.00 = Rp 19,000.00
0.15 Hr Tukang @ Rp 150,000.00 = Rp 22,500.00
15.00 @ Rp 154,050.00 = Rp 154,050.00
@ Jumlah total = Rp 1,181,050.00
Analisa Armature ME pompa

ME - 162 1 BH PEMASANGAN POMPA TRANSFER


1.00
1.00 Set Pompa Transfer CR 5 - 10 @ Rp 4,599,000.00 = Rp 4,599,000.00
lengkap Panel Control
4.00 o/hr Tukang listrik @ Rp 150,000.00 = Rp 600,000.00
2.00 o/hr Mandor @ Rp 150,000.00 = Rp 300,000.00
15.00 @ Rp 824,850.00 = Rp 824,850.00
@ Jumlah total = Rp 6,323,850.00

ME - 163 1 BH PEMASANGAN POMPA BOOSTER


1.00
1.00 Set Pompa Booster Office 1 @ Rp 4,000,000.00 = Rp 4,000,000.00
phase
Titik instalasi dr panel
1.00 ttk @ = Rp 406,983.08
lantai 04 Rp 406,983.08
2.00 o/hr Tukang listrik @ Rp 150,000.00 = Rp 300,000.00
1.00 o/hr Mandor @ Rp 150,000.00 = Rp 150,000.00
15.00 @ Rp 728,547.46 = Rp 728,547.46
@ Jumlah total = Rp 5,585,530.55
DIVISI 1
A.1.1.1 HARGA SATUAN PEKERJAAN PERSIAPAN

JDIH Kementrian PUPR 2022


A.2.2.1.4 Pengukuran dan pemasangan 1 m’ Bouwplank
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 110,000.00 11,000.00
Tukang Kayu L.02 0.100 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.010 OH 190,000.00 1,900.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 28,650.00
B BAHAN
Kayu 5/7 klas II 0.012 M3 1,835,000.00 22,020.00
Paku Biasa 2" - 5" 0.020 Kg 23,000.00 460.00
Kayu papan 3/20 kayu klas II 0.007 M3 1,835,000.00 12,845.00
JUMLAH HARGA BAHAN 35,325.00
C PERALATAN
--
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 63,975.00
E Overhead dan Provit 15 % 9,596.25
F Harga Satuan Pekerjaan (D+E) 73,571.25

A.2.2.1.7 Pembuatan 1 m2 gudang semen dan peralatan


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 110,000.00 110,000.00
Tukang Kayu L.02 2.000 OH 150,000.00 300,000.00
Kepala Tukang L.03 0.200 OH 190,000.00 38,000.00
Mandor L.04 0.050 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 455,500.00
B BAHAN
Kayu papan 3/20 kayu klas II 0.210 M3 1,835,000.00 385,350.00
Paku Biasa 0.300 Kg 23,000.00 6,900.00
Semen Portland 10.500 Kg 1,640.00 17,220.00
Pasir Beton Maligano 0.030 M3 197,500.00 5,925.00
Kerikil Beton Maligano (Pecah manual) 0.050 M3 330,300.00 16,515.00
Seng Gelombang 3' x 6" Bjls. 28 1.500 Lbr 64,500.00 96,750.00
Seng Plat 0.250 Lbr 19,300.00 4,825.00
JUMLAH HARGA BAHAN 533,485.00
C PERALATAN
--
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 988,985.00
E Overhead dan Provit 15 % 148,347.75
F Harga Satuan Pekerjaan (D+E) 1,137,332.75

A.2.2.1.8 Pembuatan 1 m2 Direksi Keet/bedeng pekerja


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.000 OH 110,000.00 110,000.00
Tukang Kayu L.02 2.000 OH 150,000.00 300,000.00
Kepala Tukang L.03 0.200 OH 190,000.00 38,000.00
Mandor L.04 0.050 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 455,500.00
B BAHAN
Dolken 1.250 Btg 9,400.00 11,750.00
Kayu Papan 0.186 M3 2,360,000.00 438,960.00
Paku Biasa 0.300 Kg 23,000.00 6,900.00
Semen Portland 18.000 Kg 1,640.00 29,520.00
Pasir Beton Maligano 0.030 M3 197,500.00 5,925.00
Kerikil Beton Maligano (Pecah manual) 0.050 M3 330,300.00 16,515.00
Seng 1.500 Lbr 64,500.00 96,750.00
Plywood 4 mm 1.350 Lbr 70,900.00 95,715.00
JUMLAH HARGA BAHAN 702,035.00
C PERALATAN
--
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,157,535.00
E Overhead dan Provit 15 % 173,630.25
F Harga Satuan Pekerjaan (D+E) 1,331,165.25
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
PEKERJAAN TANAH

A.2.3.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m JDIH Kementrian PUPR 2022


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.75 OH 110,000.00 82,500.00
Mandor L.04 0.025 OH 150,000.00 3,750.00
JUMLAH HARGA TENAGA 86,250.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 86,250.00
E Overhead dan Provit 15 % 12,937.50
F Harga Satuan Pekerjaan (D+E) 99,187.50

A.2.3.1.2 Penggalian 1 m3 tanah biasa sedalam 2 m


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.9 OH 110,000.00 99,000.00
Mandor L.04 0.045 OH 150,000.00 6,750.00
JUMLAH HARGA TENAGA 105,750.00
B BAHAN
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 105,750.00
E Overhead dan Provit 15 % 15,862.50
F Harga Satuan Pekerjaan (D+E) 121,612.50

mengurug 1 m3 tanah biasa sedalam 1 meter


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.25 OH 110,000.00 27,500.00
Mandor L.04 0.0083 OH 150,000.00 1,245.00
JUMLAH HARGA TENAGA 28,745.00
B BAHAN
Tanah Urug pilihan 1.100 78,000.00 85,800.00
JUMLAH HARGA BAHAN 85,800.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 114,545.00
E Overhead dan Provit 15 % 17,181.75
F Harga Satuan Pekerjaan (D+E) 131,726.75

Mengurug kembali 1 m3 galian tanah


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 110,000.00 55,000.00
Mandor L.04 0.05 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 62,500.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 62,500.00
E Overhead dan Provit 15 % 9,375.00
F Harga Satuan Pekerjaan (D+E) 71,875.00
Memadatkan 1 m3 tanah (per 20 cm)
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 110,000.00 55,000.00
Mandor L.04 0.05 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 62,500.00
B BAHAN
-
-
JUMLAH HARGA BAHAN -
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 62,500.00
E Overhead dan Provit 15 % 9,375.00
F Harga Satuan Pekerjaan (D+E) 71,875.00

Pengurugan 1 m3 dengan pasir urug


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Mandor L.04 0.01 OH 150,000.00 1,500.00
-
JUMLAH HARGA TENAGA 34,500.00
B BAHAN
Pasir Urug 1.2 M3 159,500.00 191,400.00
-
JUMLAH HARGA BAHAN 191,400.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 225,900.00
E Overhead dan Provit 15 % 33,885.00
F Harga Satuan Pekerjaan (D+E) 259,785.00

Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.15 OH 110,000.00 16,500.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 18,750.00
B BAHAN
Ijuk 6 kg 26,000.00 156,000.00
-
JUMLAH HARGA BAHAN 156,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 174,750.00
E Overhead dan Provit 15 % 26,212.50
F Harga Satuan Pekerjaan (D+E) 200,962.50
Mengurug 1 m3 tanah didatangkan
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.5 OH 110,000.00 55,000.00
Mandor 0.05 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 62,500.00
B BAHAN
Tanah Timbunan Biasa 1.2 77,000.00 92,400.00
-
JUMLAH HARGA BAHAN 92,400.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 154,900.00
E Overhead dan Provit 15 % 23,235.00
F Harga Satuan Pekerjaan (D+E) 178,135.00

Mengurug 1 m3 dengan Kerikil


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.5 OH 110,000.00 55,000.00
Mandor 0.05 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 62,500.00
B BAHAN
Kerikil 1.2 m3 91,800.00 110,160.00
-
JUMLAH HARGA BAHAN 110,160.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 172,660.00
E Overhead dan Provit 15 % 25,899.00
F Harga Satuan Pekerjaan (D+E) 198,559.00
A.3.2.1 HARGA SATUAN
PEKERJAAN PONDASI

A.3.2.1.2 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 4 PP


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.5 OH 110,000.00 165,000.00
Tukang Batu L.02 0.75 OH 150,000.00 112,500.00
Kepala Tukang L.03 0.075 OH 190,000.00 14,250.00
Mandor L.04 0.075 OH 150,000.00 11,250.00
JUMLAH HARGA TENAGA 303,000.00
B BAHAN
Batu Belah 1.2 M3 207,000.00 248,400.00
Semen Portland 163 Kg 1,640.00 267,320.00
Pasir Pasang 0.52 M3 170,000.00 88,400.00
JUMLAH HARGA BAHAN 604,120.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 907,120.00
E Overhead dan Provit 15 % 136,068.00
F Harga Satuan Pekerjaan (D+E) 1,043,188.00

A.3.2.1.3 Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.5 OH 110,000.00 165,000.00
Tukang Batu L.02 0.75 OH 150,000.00 112,500.00
Kepala Tukang L.03 0.075 OH 190,000.00 14,250.00
Mandor L.04 0.075 OH 150,000.00 11,250.00
JUMLAH HARGA TENAGA 303,000.00
B BAHAN
Batu Belah 1.2 M3 207,000.00 248,400.00
Semen Portland 136 Kg 1,640.00 223,040.00
Pasir Pasang 0.544 M3 170,000.00 92,480.00
JUMLAH HARGA BAHAN 563,920.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 866,920.00
E Overhead dan Provit 15 % 130,038.00
F Harga Satuan Pekerjaan (D+E) 996,958.00

A.3.2.1.9 Memasang 1 m3 batu kosong (anstamping)


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.78 OH 110,000.00 85,800.00
Tukang Batu L.02 0.39 OH 150,000.00 58,500.00
Kepala Tukang L.03 0.039 OH 190,000.00 7,410.00
Mandor L.04 0.039 OH 150,000.00 5,850.00
JUMLAH HARGA TENAGA 157,560.00
B BAHAN
Batu Belah 1.2 M3 207,000.00 248,400.00
Pasir Urug 0.432 M3 170,000.00 73,440.00
JUMLAH HARGA BAHAN 321,840.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 479,400.00
E Overhead dan Provit 15 % 71,910.00
F Harga Satuan Pekerjaan (D+E) 551,310.00
ANALISA HARGA SATUAN
PEKERJAAN BETON
Permen 28 PUPR 2016

1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.65 OH 110,000.00 181,500.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Kepala Tukang L.03 0.028 OH 190,000.00 5,320.00
Mandor L.04 0.083 OH 150,000.00 12,450.00
JUMLAH HARGA TENAGA 240,520.00
B BAHAN
Semen Portland 247 kg 1,640.00 405,080.00
Pasir Beton Maligano 869 kg 141.07 122,591.07
Kerikil Beton Maligano (Pecah manual) 999 kg 244.67 244,422.00
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 793,593.07
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,034,113.07
E Overhead dan Provit 15 % 155,116.96
F Harga Satuan Pekerjaan (D+E) 1,189,230.03

2 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.65 OH 110,000.00 181,500.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Kepala Tukang L.03 0.028 OH 190,000.00 5,320.00
Mandor L.04 0.083 OH 150,000.00 12,450.00
JUMLAH HARGA TENAGA 240,520.00
B BAHAN
Semen Portland 406 kg 1,640.00 665,840.00
Pasir Beton Maligano 684 kg 141.07 96,492.86
Kerikil Beton Maligano (Pecah manual) 1026 kg 244.67 251,028.00
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,034,860.86
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,275,380.86
E Overhead dan Provit 15 % 191,307.13
F Harga Satuan Pekerjaan (D+E) 1,466,687.99

3 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.65 OH 110,000.00 181,500.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Kepala Tukang L.03 0.028 OH 190,000.00 5,320.00
Mandor L.04 0.083 OH 150,000.00 12,450.00
JUMLAH HARGA TENAGA 240,520.00
B BAHAN
Semen Portland 413 kg 1,640.00 677,320.00
Pasir Beton Maligano 681 kg 141.07 96,069.64
Kerikil Beton Maligano (Pecah manual) 1021 kg 244.67 249,804.67
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,044,694.31
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,285,214.31
E Overhead dan Provit 15 % 192,782.15
F Harga Satuan Pekerjaan (D+E) 1,477,996.46
4 Pembesian 10 kg dengan besi ulir
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.07 OH 110,000.00 7,700.00
Tukang Besi Konstruksi L.02 0.07 OH 150,000.00 10,500.00
Kepala Tukang L.03 0.007 OH 190,000.00 1,330.00
Mandor L.04 0.004 OH 150,000.00 600.00
JUMLAH HARGA TENAGA 20,130.00
B BAHAN
Besi Beton Ulir 10.5 kg 26,000.00 273,000.00
Kawat Beton 0.15 kg 26,400.00 3,960.00
JUMLAH HARGA BAHAN 276,960.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 297,090.00
E Overhead dan Provit 15 % 44,563.50
F Harga Satuan Pekerjaan (D+E) 341,653.50
UNTUK /KG 34,165.35

Pembesian 10 kg dengan besi polos


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.07 OH 110,000.00 7,700.00
Tukang Besi Konstruksi L.02 0.07 OH 150,000.00 10,500.00
Kepala Tukang L.03 0.007 OH 190,000.00 1,330.00
Mandor L.04 0.004 OH 150,000.00 600.00
JUMLAH HARGA TENAGA 20,130.00
B BAHAN
Besi Beton Polos 10.5 kg 13,000.00 136,500.00
Kawat Beton 0.15 kg 26,400.00 3,960.00
JUMLAH HARGA BAHAN 140,460.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 160,590.00
E Overhead dan Provit 15 % 24,088.50
F Harga Satuan Pekerjaan (D+E) 184,678.50
UNTUK /KG 18,467.85

Memasang 10 Kg jaring kawat baja/wire mesh


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.025 OH 110,000.00 2,750.00
Tukang Besi Konstruksi L.02 0.025 OH 150,000.00 3,750.00
Kepala Tukang L.03 0.025 OH 190,000.00 4,750.00
Mandor L.04 0.001 OH 150,000.00 150.00
JUMLAH HARGA TENAGA 11,400.00
B BAHAN
Jaring kawat baja dilas 10.2 kg Err:509 Err:509
Kawat Beton 0.05 kg 26,400.00 1,320.00
JUMLAH HARGA BAHAN Err:509
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) Err:509
E Overhead dan Provit 15 % Err:509
F Harga Satuan Pekerjaan (D+E) Err:509
per 1 kg Err:509
Memasang 1 m2 bekisting untuk pondasi
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.52 OH 110,000.00 57,200.00
Tukang Kayu L.02 0.26 OH 150,000.00 39,000.00
Kepala Tukang L.03 0.026 OH 190,000.00 4,940.00
Mandor L.04 0.026 OH 150,000.00 3,900.00
JUMLAH HARGA TENAGA 105,040.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,625,000.00 65,000.00
Paku 5 cm – 10 cm 0.3 kg 23,000.00 6,900.00
Minyak Bekisting/ minyak cat 0.1 Liter 5,000.00 500.00
JUMLAH HARGA BAHAN 72,400.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 177,440.00
E Overhead dan Provit 15 % 26,616.00
F Harga Satuan Pekerjaan (D+E) 204,056.00
G 2 X Pakai 102,028.00

Memasang 1 m2 bekisting untuk sloof


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.52 OH 110,000.00 57,200.00
Tukang Kayu L.02 0.26 OH 150,000.00 39,000.00
Kepala Tukang L.03 0.026 OH 190,000.00 4,940.00
Mandor L.04 0.026 OH 150,000.00 3,900.00
JUMLAH HARGA TENAGA 105,040.00
B BAHAN
Papan kayu kelas II 0.045 m3 1,625,000.00 73,125.00
Paku 5 cm – 10 cm 0.3 kg 23,000.00 6,900.00
Minyak Bekisting/ minyak cat 0.1 Liter 5,000.00 500.00
JUMLAH HARGA BAHAN 80,525.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 185,565.00
E Overhead dan Provit 15 % 27,834.75
F Harga Satuan Pekerjaan (D+E) 213,399.75
G 2 X Pakai 106,699.88

Memasang 1 m2 bekisting untuk kolom


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.66 OH 110,000.00 72,600.00
Tukang Kayu L.02 0.33 OH 150,000.00 49,500.00
Kepala Tukang L.03 0.033 OH 190,000.00 6,270.00
Mandor L.04 0.033 OH 150,000.00 4,950.00
JUMLAH HARGA TENAGA 133,320.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,625,000.00 65,000.00
Paku 5 cm – 12 cm 0.4 kg 23,000.00 9,200.00
Minyak Bekisting/ minyak cat 0.2 Liter 5,000.00 1,000.00
Balok kayu kelas II 0.015 m3 1,625,000.00 24,375.00
Plywood Tebal 9 mm 0.35 Lbr 246,000.00 86,100.00
Dolken dia. 5 cm 2 Batang 6,000.00 12,000.00
JUMLAH HARGA BAHAN 197,675.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 330,995.00
E Overhead dan Provit 15 % 49,649.25
F Harga Satuan Pekerjaan (D+E) 380,644.25
G 2 X Pakai 190,322.13
Memasang 1 m2 bekisting untuk balok
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.66 OH 110,000.00 72,600.00
Tukang Kayu L.02 0.33 OH 150,000.00 49,500.00
Kepala Tukang L.03 0.033 OH 190,000.00 6,270.00
Mandor L.04 0.033 OH 150,000.00 4,950.00
JUMLAH HARGA TENAGA 133,320.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,625,000.00 65,000.00
Paku 5 cm – 12 cm 0.4 kg 23,000.00 9,200.00
Minyak Bekisting/ minyak cat 0.2 Liter 5,000.00 1,000.00
Balok kayu kelas II 0.018 m3 1,625,000.00 29,250.00
Plywood Tebal 9 mm 0.35 Lbr 246,000.00 86,100.00
Dolken dia. 5 cm 2 Batang 6,000.00 12,000.00
JUMLAH HARGA BAHAN 202,550.00
C PERALATAN

JUMLAH HARGA ALAT


D JUMLAH (A+B+C) 335,870.00
E Overhead dan Provit 15 % 50,380.50
F Harga Satuan Pekerjaan (D+E) 386,250.50
G 2 X Pakai 193,125.25

Memasang 1 m2 bekisting untuk plat lantai


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.66 OH 110,000.00 72,600.00
Tukang Kayu L.02 0.33 OH 150,000.00 49,500.00
Kepala Tukang L.03 0.033 OH 190,000.00 6,270.00
Mandor L.04 0.033 OH 150,000.00 4,950.00
JUMLAH HARGA TENAGA 133,320.00
B BAHAN
Papan kayu kelas II 0.04 m3 1,625,000.00 65,000.00
Paku 5 cm – 12 cm 0.4 kg 23,000.00 9,200.00
Minyak Bekisting/ minyak cat 0.2 Liter 5,000.00 1,000.00
Balok kayu kelas II 0.01 m3 1,625,000.00 16,250.00
Plywood Tebal 9 mm 0.35 Lbr 246,000.00 86,100.00
Dolken dia. 5 cm 6 Batang 6,000.00 36,000.00
JUMLAH HARGA BAHAN 213,550.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 346,870.00
E Overhead dan Provit 15 % 52,030.50
F Harga Satuan Pekerjaan (D+E) 398,900.50
Harga 2x Pakai 199,450.25

Memasang 1 m2 bekisting untuk dinding


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.66 OH 110,000.00 72,600.00
Tukang Kayu L.02 0.33 OH 150,000.00 49,500.00
Kepala Tukang L.03 0.033 OH 190,000.00 6,270.00
Mandor L.04 0.033 OH 150,000.00 4,950.00
JUMLAH HARGA TENAGA 133,320.00
B BAHAN
Papan kayu kelas II 0.03 m3 1,625,000.00 48,750.00
Paku 5 cm – 12 cm 0.4 kg 23,000.00 9,200.00
Minyak Bekisting/ minyak cat 0.2 Liter 5,000.00 1,000.00
Balok kayu kelas II 0.02 m3 1,625,000.00 32,500.00
Plywood Tebal 9 mm 0.35 Lbr 246,000.00 86,100.00
Dolken dia. 5 cm 3 Batang 6,000.00 18,000.00
Formite/penjaga jarak bekisting/spacer 4 Buah - -
JUMLAH HARGA BAHAN 195,550.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 328,870.00
E Overhead dan Provit 15 % 49,330.50
F Harga Satuan Pekerjaan (D+E) 378,200.50
Memasang 1 m2 bekisting untuk tangga
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.66 OH 110,000.00 72,600.00
Tukang Kayu L.02 0.33 OH 150,000.00 49,500.00
Kepala Tukang L.03 0.033 OH 190,000.00 6,270.00
Mandor L.04 0.033 OH 150,000.00 4,950.00
JUMLAH HARGA TENAGA 133,320.00
B BAHAN
Papan kayu kelas II 0.03 m3 1,625,000.00 48,750.00
Paku 5 cm – 12 cm 0.4 kg 23,000.00 9,200.00
Minyak Bekisting/ minyak cat 0.15 Liter 5,000.00 750.00
Balok kayu kelas I 0.015 m3 1,625,000.00 24,375.00
Plywood Tebal 9 mm 0.35 Lbr 246,000.00 86,100.00
Dolken dia. 5 cm 2 Batang 6,000.00 12,000.00
JUMLAH HARGA BAHAN 181,175.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 314,495.00
E Overhead dan Provit 15 % 47,174.25
F Harga Satuan Pekerjaan (D+E) 361,669.25
Harga 2x pakai 180,834.63

Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 5.3 OH 110,000.00 583,000.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Tukang Kayu L.02 1.3 OH 150,000.00 195,000.00
Tukang Besi Konstruksi L.02 1.05 OH 150,000.00 157,500.00
Kepala Tukang L.03 0.262 OH 190,000.00 49,780.00
Mandor L.04 0.265 OH 150,000.00 39,750.00
JUMLAH HARGA TENAGA 1,066,280.00
B BAHAN
Papan kayu kelas II 0.2 m3 1,835,000.00 367,000.00
Paku 5 cm – 12 cm 1.5 kg 23,000.00 34,500.00
Minyak Bekisting/ minyak cat 0.4 Liter 5,000.00 2,000.00
Besi Beton Ulir 157.5 kg 26,000.00 4,095,000.00
Kawat Beton 2.25 kg 26,400.00 59,400.00
Semen Portland 336 kg 1,640.00 551,040.00
Pasir Beton Maligano 0.54 m3 197,500.00 106,650.00
Kerikil Beton Maligano (Pecah manual) 0.81 m3 330,300.00 267,543.00
JUMLAH HARGA BAHAN 5,483,133.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 6,549,413.00
E Overhead dan Provit 15 % 982,411.95
F Harga Satuan Pekerjaan (D+E) 7,531,824.95
Membuat 1 m3 dinding beton bertulang (200 kg besi + bekisting)
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 5.65 OH 110,000.00 621,500.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Tukang Kayu L.02 1.56 OH 150,000.00 234,000.00
Tukang Kayu L.02 1.4 OH 150,000.00 210,000.00
Tukang Besi Konstruksi L.03 0.323 OH 190,000.00 61,370.00
Mandor L.04 0.283 OH 150,000.00 42,450.00
JUMLAH HARGA TENAGA 1,210,570.00
B BAHAN
Papan kayu kelas II 0.25 m3 1,835,000.00 458,750.00
Paku 5 cm – 12 cm 3 kg 23,000.00 69,000.00
Minyak Bekisting/ minyak cat 1.2 Liter 5,000.00 6,000.00
Besi Beton Ulir 210 kg 26,000.00 5,460,000.00
Kawat Beton 3 kg 26,400.00 79,200.00
Semen Portland 336 kg 1,640.00 551,040.00
Pasir Beton Maligano 0.54 m3 197,500.00 106,650.00
Kerikil Beton Maligano (Pecah manual) 0.81 m3 330,300.00 267,543.00
Balok kayu kelas II 0.105 m3 1,835,000.00 192,675.00
Plywood Tebal 9 mm 2.5 Lembar 151,000.00 377,500.00
Dolken dia. 5 cm 14 Batang 6,000.00 84,000.00
JUMLAH HARGA BAHAN 7,652,358.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 8,862,928.00
E Overhead dan Provit 15 % 1,329,439.20
F Harga Satuan Pekerjaan (D+E) 10,192,367.20
G 2 X Pakai 180,834.63

Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.18 OH 110,000.00 19,800.00
Tukang Batu L.02 0.02 OH 150,000.00 3,000.00
Tukang Kayu L.02 0.02 OH 150,000.00 3,000.00
Tukang Besi Konstruksi L.02 0.02 OH 150,000.00 3,000.00
Kepala Tukang L.03 0.006 OH 190,000.00 1,140.00
Mandor L.04 0.009 OH 150,000.00 1,350.00
JUMLAH HARGA TENAGA 31,290.00
B BAHAN
Papan kayu kelas II 0.002 m3 1,835,000.00 3,670.00
Paku 5 cm – 12 cm 0.01 kg 23,000.00 230.00
Besi Beton Ulir 3 kg 26,000.00 78,000.00
Kawat Beton 0.45 kg 26,400.00 11,880.00
Semen Portland 4 kg 1,640.00 6,560.00
Pasir Beton Maligano 0.006 m3 197,500.00 1,185.00
Balok kayu kelas II 0.015 m3 1,835,000.00 27,525.00
Kerikil Beton Maligano (Pecah manual) 0.009 m3 330,300.00 2,972.70
JUMLAH HARGA BAHAN 132,022.70
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 163,312.70
E Overhead dan Provit 15 % 24,496.91
F Harga Satuan Pekerjaan (D+E) 187,809.61
Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.297 OH 110,000.00 32,670.00
Tukang Batu L.02 0.033 OH 150,000.00 4,950.00
Tukang Kayu L.02 0.033 OH 150,000.00 4,950.00
Tukang Besi Konstruksi L.02 0.033 OH 150,000.00 4,950.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 51,670.00
B BAHAN
Papan kayu kelas II 0.003 m3 1,835,000.00 5,505.00
Paku 5 cm – 12 cm 0.02 kg 23,000.00 460.00
Besi Beton Ulir 3.6 kg 26,000.00 93,600.00
Kawat Beton 0.05 kg 26,400.00 1,320.00
Semen Portland 5.5 kg 1,640.00 9,020.00
Pasir Beton Maligano 0.009 m3 197,500.00 1,777.50
Kerikil Beton Maligano (Pecah manual) 0.015 m3 330,300.00 4,954.50
JUMLAH HARGA BAHAN 116,637.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 168,307.00
E Overhead dan Provit 15 % 25,246.05
F Harga Satuan Pekerjaan (D+E) 193,553.05

Membuat 1 m3 Plat beton K 300 (bondek + wiremesh)


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 5.3 OH 110,000.00 583,000.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Tukang Kayu L.02 1.3 OH 150,000.00 195,000.00
Tukang Besi Konstruksi L.02 1.05 OH 150,000.00 157,500.00
Kepala Tukang L.03 0.265 OH 190,000.00 50,350.00
Mandor L.04 0.265 OH 150,000.00 39,750.00
JUMLAH HARGA TENAGA 1,066,850.00
B BAHAN
Bondek 9.09 m2 125,000.00 1,136,250.00
Wiremesh m 8 9.1 m2 54,450.00 495,495.00
air 215 Liter 100.00 21,500.00
Kawat Beton 0.05 kg 26,400.00 1,320.00
Semen Portland 413 kg 1,640.00 677,320.00
Pasir Beton Maligano 0.54 m3 197,500.00 106,650.00
Kerikil Beton Maligano (Pecah manual) 0.81 m3 330,300.00 267,543.00

JUMLAH HARGA BAHAN 2,706,078.00


C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 3,772,928.00
E Overhead dan Provit 15 % 565,939.20
F Harga Satuan Pekerjaan (D+E) 4,338,867.20
Mengerjakan 1 m1 Tiang Pancang beton bertulang
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
1 Pekerja L.01 0.2405 OH 110,000.00 26,455.00
2 Tukang L.02 0.0481 OH 150,000.00 7,215.00
3 Mandor L.04 0.0481 OH 150,000.00 7,215.00
JUMLAH HARGA TENAGA 40,885.00
B BAHAN
1 Tiang pancang Pracetak 0.0833 bh 829,500.00 69,097.35
JUMLAH HARGA BAHAN 69,097.35
C PERALATAN
1 Crane (di base camp) 0.034 jam 50,700.00 1,698.45
2 Trailer 28 ton 0.004 jam 50,700.00 207.87
3 crane (dilokasi) 0.121 jam 50,700.00 6,109.35
4 Pile driver hammer 0.048 jam 50,700.00 2,438.67
5 Welding set 0.179 jam 50,700.00 9,055.02
JUMLAH HARGA ALAT 19,509.36
D JUMLAH (A+B+C) 129,491.71
E Overhead dan Provit 15 % 19,423.76
F Harga Satuan Pekerjaan (D+E) 148,915.47

Membuat 1 m3 Plat beton K 300 + 1m2 bondek + 1 m2 wiremesh+ 1 m2 Bekesting samping


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
Memasang 1 m2 Bondek 0,75
A TENAGA
Pekerja L.01 0.391 OH 110,000.00 43,010.00
Tukang Besi Konstruksi L.02 0.042 OH 150,000.00 6,300.00
Tukang Kayu L.02 0.076 OH 150,000.00 11,400.00
Tukang Batu L.02 0.119 OH 150,000.00 17,850.00
Mandor L.04 0.126 OH 150,000.00 18,900.00
JUMLAH HARGA TENAGA 97,460.00
B BAHAN
Bondek 0.013 m2 125,000.00 1,625.00
elektroda RB 26 0.027 box 200,000.00 5,400.00
Wiremesh m 8 0.517 lbr 900,000.00 465,300.00
Plywood 9 mm 0.34 lbr 151,000.00 51,340.00
Kayu Balok 5/7 0.044 m3 2,360,000.00 103,840.00
kawat beton 0.076 kg 26,400.00 2,006.40
paku campur 0.114 kg 23,000.00 2,622.00
Beton K 300 1.077 m3 1,477,996.46 1,591,802.18
JUMLAH HARGA BAHAN 2,223,935.58
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 2,321,395.58
E Overhead dan Provit 15 % 348,209.34
F Harga Satuan Pekerjaan (D+E) 2,669,604.92

Memasang 1 m2 Plat bondek


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.026 OH 110,000.00 2,860.00
Tukang Besi Konstruksi L.02 0.018 OH 150,000.00 2,700.00
Mandor L.04 0.009 OH 150,000.00 1,350.00
JUMLAH HARGA TENAGA 6,910.00
B BAHAN
Bondek 0,75 mm 1.1 m2 125,000.00 137,500.00
elektroda RB 26 0.015 box 200,000.00 3,000.00
JUMLAH HARGA BAHAN 140,500.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 147,410.00
E Overhead dan Provit 15 % 22,111.50
F Harga Satuan Pekerjaan (D+E) 169,521.50
ANALISA HARGA SATUAN
PEKERJAAN BESI DAN ALUMINIUM

Mengerjakan 10 cm pengelasan dengan las listrik JDIH Kementrian PUPR 2022


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.04 OH 110,000.00 4,400.00
Tukang Besi Konstruksi L.02 0.02 OH 150,000.00 3,000.00
Kepala Tukang L.03 0.002 OH 190,000.00 380.00
Mandor L.04 0.002 OH 150,000.00 300.00
JUMLAH HARGA TENAGA 8,080.00
B BAHAN
Kawat las listrik 0.4 Kg 25,000.00 10,000.00
Solar 0.3 Liter 12,380.00 3,714.00
Minyak pelumas 0.04 Liter 33,800.00 1,352.00
JUMLAH HARGA BAHAN 15,066.00
C PERALATAN
-
Sewa alat las listrik 0.017 Jam 50,709.00 862.05
-
JUMLAH HARGA ALAT 862.05
D JUMLAH (A+B+C) 24,008.05
E Overhead dan Provit 15 % 3,601.21
F Harga Satuan Pekerjaan (D+E) 27,609.26
G Harga per 1 cm 2,760.93

Mengerjakan 40 cm pemasangan angkur besi Dia 10 mm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1 OH 110,000.00 11,000.00
Tukang Besi Konstruksi L.02 0.02 OH 150,000.00 3,000.00
Kepala Tukang L.03 0.002 OH 190,000.00 380.00
Mandor L.04 0.002 OH 150,000.00 300.00
JUMLAH HARGA TENAGA 14,680.00
B BAHAN
Besi Beton polos Dia 10 mm 0.3085 Kg 13,000.00 4,010.50

JUMLAH HARGA BAHAN 4,010.50


C PERALATAN
-

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 18,690.50
E Overhead dan Provit 15 % 2,803.58
F Harga Satuan Pekerjaan (D+E) 21,494.08

Pemasangan 1 kg Besi Profil


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.06 OH 110,000.00 6,600.00
Tukang Besi Konstruksi L.02 0.06 OH 150,000.00 9,000.00
Kepala Tukang L.03 0.006 OH 190,000.00 1,140.00
Mandor L.04 0.003 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 17,190.00
B BAHAN
Besi Profil 1.15 Kg 16,800.00 19,320.00

JUMLAH HARGA BAHAN 19,320.00


C PERALATAN
-

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 36,510.00
E Overhead dan Provit 15 % 5,476.50
F Harga Satuan Pekerjaan (D+E) 41,986.50
Pemasangan 1 kg Rangka kuda-kuda Besi Baja IWF
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.06 OH 110,000.00 6,600.00
Tukang Besi Konstruksi L.02 0.06 OH 150,000.00 9,000.00
Kepala Tukang L.03 0.006 OH 190,000.00 1,140.00
Mandor L.04 0.003 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 17,190.00
B BAHAN
Besi Baja IWF 1.15 Kg 17,200.00 19,780.00

JUMLAH HARGA BAHAN 19,780.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 36,970.00
E Overhead dan Provit 15 % 5,545.50
F Harga Satuan Pekerjaan (D+E) 42,515.50

Pekerjaan 100 kg Perakitan


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1 OH 110,000.00 11,000.00
Tukang Besi Konstruksi L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.001 OH 190,000.00 190.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 26,940.00
B BAHAN
solar 1 ltr 12,380.00 12,380.00
minyak pelumas 0.1 ltr 33,800.00 3,380.00

JUMLAH HARGA BAHAN 15,760.00


C PERALATAN
sewa lat 0.8 jam 50,700.00 40,560.00

JUMLAH HARGA ALAT 40,560.00


D JUMLAH (A+B+C) 83,260.00
E Overhead dan Provit 15 % 12,489.00
F Harga Satuan Pekerjaan (D+E) 95,749.00
per 1 kg 957.49

Pekerjaan 1 bh Beugel U alas kuda-kuda (plat baja 4,4mm) baut dia 10mm
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1 OH 110,000.00 11,000.00
Tukang Besi Konstruksi L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.001 OH 190,000.00 190.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 26,940.00
B BAHAN
Beghel U Besi Plat Baja U 4.40mm 1 bh 28,000.00 28,000.00
Baut Dia. 10mm 1 bh 5,000.00 5,000.00
-
JUMLAH HARGA BAHAN 33,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 59,940.00
E Overhead dan Provit 15 % 8,991.00
F Harga Satuan Pekerjaan (D+E) 68,931.00

2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1 OH 110,000.00 11,000.00
Tukang Besi Konstruksi L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.001 OH 190,000.00 190.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 26,940.00
B BAHAN
Baut Dia. 10mm 2 bh 5,000.00 10,000.00
-
JUMLAH HARGA BAHAN 10,000.00
C PERALATAN

JUMLAH HARGA ALAT -


D JUMLAH (A+B+C) 36,940.00
E Overhead dan Provit 15 % 5,541.00
F Harga Satuan Pekerjaan (D+E) 42,481.00
1 SET PEK BEGHEL, BEGHEL U, PLAT BAJA, BAUT UNTUK 1 BH KUDA2-KUDA
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1 OH 110,000.00 11,000.00
Tukang Besi Konstruksi L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.001 OH 190,000.00 190.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 26,940.00
B BAHAN
Beghel U (Plat Baja U 4.40mm) 2.00 bh 28,984.38 57,968.75
Beghel U (Besi Polos 12mm) 1.00 bh 13,000.00 13,000.00
Plat Baja 4.40mm 6.00 bh 28,984.38 173,906.25
Baut Dia. 10mm (25-30cm) 22.00 bh 5,000.00 110,000.00
JUMLAH HARGA BAHAN 354,875.00
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 381,815.00
E Overhead dan Provit 15 % 57,272.25
F Harga Satuan Pekerjaan (D+E) 439,087.25

1 SET PEK Huruf bahan Stailes warna


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.01 OH 110,000.00 1,100.00
Tukang Besi Konstruksi L.02 0.01 OH 150,000.00 1,500.00
Kepala Tukang L.03 0.001 OH 190,000.00 190.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 3,540.00
B BAHAN
Plat Stailes 0.1200 cm 28,984.38 3,478.13
Lem Besi 0.0100 kg 25,000.00 250.00
JUMLAH HARGA BAHAN 3,728.13
C PERALATAN

-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 7,268.13
E Overhead dan Provit 15 % 1,090.22
F Harga Satuan Pekerjaan (D+E) 8,358.34

Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, Untuk partisi
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.25 OH 110,000.00 27,500.00
Tukang Besi Konstruksi L.02 0.25 OH 150,000.00 37,500.00
Kepala Tukang L.03 0.025 OH 190,000.00 4,750.00
Mandor L.04 0.013 OH 150,000.00 1,950.00
JUMLAH HARGA TENAGA 71,700.00
B BAHAN
Rangka Plafond Hollo 4.4.02 3.5 m’ 24,333.33 85,166.67
Aksesori, perkuatan las dll 1 LS 24,333.33 24,333.33
JUMLAH HARGA BAHAN 109,500.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 181,200.00
E Overhead dan Provit 15 % 27,180.00
F Harga Satuan Pekerjaan (D+E) 208,380.00
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.35 OH 110,000.00 38,500.00
Tukang Besi Konstruksi L.02 0.35 OH 150,000.00 52,500.00
Kepala Tukang L.03 0.035 OH 190,000.00 6,650.00
Mandor L.04 0.018 OH 150,000.00 2,700.00
JUMLAH HARGA TENAGA 100,350.00
B BAHAN
Rangka Plafond Hollo 4.4.02 4 m’ 24,333.33 97,333.33
Assesoris rangka besi hollow plafond 1 LS 5,000.00 5,000.00
JUMLAH HARGA BAHAN 102,333.33
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 202,683.33
E Overhead dan Provit 15 % 30,402.50
F Harga Satuan Pekerjaan (D+E) 233,085.83

Membuat 1 m2 railling Besi JDIH Kementrian PUPR 2022


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1 OH 110,000.00 110,000.00
Tukang Besi Konstruksi L.02 1 OH 150,000.00 150,000.00
Kepala Tukang L.03 0.1 OH 190,000.00 19,000.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 279,750.00
B BAHAN
Stainlesteel Kotak 40/40 mm 4 M 24,333.33 97,333.33
Stainlesteel Kotak 20/40 mm 1 M 19,833.33 19,833.33
Pengelasan 20 Cm 2,760.93 55,218.52
Pengecatan 0.76 m2 208,569.75 158,513.01
JUMLAH HARGA BAHAN 330,898.20
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 610,648.20
E Overhead dan Provit 15 % 91,597.23
F Harga Satuan Pekerjaan (D+E) 702,245.43

Pemasangan 1 m2 Aluminium Composite Panel


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1500 OH 110,000.00 16,500.00
Tukang Besi Konstruksi L.02 0.0750 OH 150,000.00 11,250.00
Kepala Tukang L.03 0.0080 OH 190,000.00 1,520.00
Mandor L.04 0.0080 OH 150,000.00 1,200.00
JUMLAH HARGA TENAGA 30,470.00
B BAHAN
Aluminium composite panel type PVDF 0.3 1.0000 m2 104,000.00 104,000.00
Srew 20.0000 bh 500.00 10,000.00
JUMLAH HARGA BAHAN 114,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 144,470.00
E Overhead dan Provit 15 % 21,670.50
F Harga Satuan Pekerjaan (D+E) 166,140.50

Pemasangan 1 m2 Aluminium Composite Panel + Cutting


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1500 OH 110,000.00 16,500.00
Tukang Besi Konstruksi L.02 0.0750 OH 150,000.00 11,250.00
Kepala Tukang L.03 0.0080 OH 190,000.00 1,520.00
Mandor L.04 0.0080 OH 150,000.00 1,200.00
JUMLAH HARGA TENAGA 30,470.00
B BAHAN
Aluminium composite panel (ACP) 1.0000 m2 104,000.00 104,000.00
Laser Cutting 1.0000 m2 277,000.00 277,000.00
JUMLAH HARGA BAHAN 381,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 411,470.00
E Overhead dan Provit 15 % 61,720.50
F Harga Satuan Pekerjaan (D+E) 473,190.50
Membuat 1 m2 railling/ pagar (besi hollow ) JDIH Kementrian PUPR 2022
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 1.05 OH 110,000.00 115,500.00
Tukang Besi Konstruksi L.02 1.05 OH 150,000.00 157,500.00
Kepala Tukang L.03 0.105 OH 190,000.00 19,950.00
Mandor L.04 0.0053 OH 150,000.00 795.00
JUMLAH HARGA TENAGA 293,745.00
B BAHAN
Besi Hollow 4.4.0,2 mm 3.87 M 24,333.33 94,170.00
Besi Hollow 4.2.0,2 mm 8.02 M 19,833.33 159,063.33
Pengelasan 20 Cm 2,760.93 55,218.52
JUMLAH HARGA BAHAN 308,451.86
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 602,196.86
E Overhead dan Provit 15 % 90,329.53
F Harga Satuan Pekerjaan (D+E) 692,526.38

mengerjakan dan Memasang 1 m1 kusen Jendela rangka alluminium fin coating Powder
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.043 OH 110,000.00 4,730.00
Tukang Besi Konstruksi L.02 0.004 OH 150,000.00 600.00
Kepala Tukang L.03 0.043 OH 190,000.00 8,170.00
Mandor L.04 0.002 OH 150,000.00 300.00
JUMLAH HARGA TENAGA 13,800.00
B BAHAN
kusen profil alumunium 4' fin coathing powder 1.1 m 136,500.00 150,150.00
Secrup fisher 2 bj 500.00 1,000.00
Sealant 0.11 Tube 25,000.00 2,750.00
JUMLAH HARGA BAHAN 153,900.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 167,700.00
E Overhead dan Provit 15 % 25,155.00
F Harga Satuan Pekerjaan (D+E) 192,855.00

mengerjakan dan Memasang 1 m1 Daun Jendela aluminium Casemment


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.043 OH 110,000.00 4,730.00
Tukang Besi Konstruksi L.02 0.004 OH 150,000.00 600.00
Kepala Tukang L.03 0.043 OH 190,000.00 8,170.00
Mandor L.04 0.002 OH 150,000.00 300.00
JUMLAH HARGA TENAGA 13,800.00
B BAHAN
kusen profil alumunium Casement 1.1 m1 143,000.00 157,300.00
Paku Tembak payung 2 bj 200.00 400.00
karet kaca 1.1 m1 10,200.00 11,220.00
JUMLAH HARGA BAHAN 168,920.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 182,720.00
E Overhead dan Provit 15 % 27,408.00
F Harga Satuan Pekerjaan (D+E) 210,128.00

mengerjakan dan Memasang 1 m2 Kisi-kisi alumunium coating powder


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.043 OH 110,000.00 4,730.00
Tukang Besi Konstruksi L.02 0.004 OH 150,000.00 600.00
Kepala Tukang L.03 0.043 OH 190,000.00 8,170.00
Mandor L.04 0.002 OH 150,000.00 300.00
JUMLAH HARGA TENAGA 13,800.00
B BAHAN
profil alumunium slimar 20.7 m1 143,000.00 2,960,100.00
Paku Tembak payung 20 bj 200.00 4,000.00
JUMLAH HARGA BAHAN 2,964,100.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 2,977,900.00
E Overhead dan Provit 15 % 446,685.00
F Harga Satuan Pekerjaan (D+E) 3,424,585.00
mengerjakan dan Memasang 1 m2 Pintu Kaca Tempered
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.25 OH 110,000.00 27,500.00
Tukang Besi Konstruksi L.02 0.025 OH 150,000.00 3,750.00
Kepala Tukang L.03 0.025 OH 190,000.00 4,750.00
Mandor L.04 0.0013 OH 150,000.00 195.00
JUMLAH HARGA TENAGA 36,195.00
B BAHAN
Pintu Kaca Tempered tebal 12 mm 1.1 m2 1,450,000.00 1,595,000.00

JUMLAH HARGA BAHAN 1,595,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,631,195.00
E Overhead dan Provit 15 % 244,679.25
F Harga Satuan Pekerjaan (D+E) 1,875,874.25

mengerjakan dan Memasang Aksesoris Pintu Kaca Tempered


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 110,000.00 55,000.00
Tukang Besi Konstruksi L.02 0.05 OH 150,000.00 7,500.00
Kepala Tukang L.03 0.05 OH 190,000.00 9,500.00
Mandor L.04 0.003 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 72,450.00
B BAHAN
Overpanel Pivot Patch Fitting PT 2240 US32 1 bh 923,000.00 923,000.00
Top Patch Fitting PT 2220 US32 1 bh 598,000.00 598,000.00
Bottom Patch Fitting PT 2210 US32 1 bh 598,000.00 598,000.00
JUMLAH HARGA BAHAN 2,119,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 2,191,450.00
E Overhead dan Provit 15 % 328,717.50
F Harga Satuan Pekerjaan (D+E) 2,520,167.50
1,144,767.50
771,017.50
771,017.50

mengerjakan dan Memasang kunci Pintu Kaca Tempered


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 110,000.00 55,000.00
Tukang Besi Konstruksi L.02 0.05 OH 150,000.00 7,500.00
Kepala Tukang L.03 0.05 OH 190,000.00 9,500.00
Mandor L.04 0.003 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 72,450.00
B BAHAN
Floor Hinge FH 84FB S 1 bh 1,250,000.00 1,250,000.00
Patch Lock US2210 US32 1 bh 870,000.00 870,000.00
Double Cylinder DC.Fn1001-60 US14 1 bh 143,000.00 143,000.00
JUMLAH HARGA BAHAN 2,263,000.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 2,335,450.00
E Overhead dan Provit 15 % 350,317.50
F Harga Satuan Pekerjaan (D+E) 2,685,767.50

mengerjakan dan Memasang HAndlle Pintu Kaca Tempered


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 110,000.00 55,000.00
Tukang Besi Konstruksi L.02 0.05 OH 150,000.00 7,500.00
Kepala Tukang L.03 0.05 OH 190,000.00 9,500.00
Mandor L.04 0.003 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 72,450.00
B BAHAN
Pull Handle GHD4502 uk. 600x900mm US32 1 bh 1,400,000.00 1,400,000.00

JUMLAH HARGA BAHAN 1,400,000.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,472,450.00
E Overhead dan Provit 15 % 220,867.50
F Harga Satuan Pekerjaan (D+E) 1,693,317.50
Memasang 1 unit pintu kaca tempered
1 unit Pintu Kaca Tempered
Pintu Kaca Tempered T.12 mm, Fin. Clear 4.4 m2 1,875,874.25 8,253,846.70
Top Patch Fitting PT 2220 US32 2 bh 771,017.50 1,542,035.00
Pas. Kunci Pintu Kaca Tempered 2 bh 2,685,767.50 5,371,535.00
Pas. Pull Handle GHD4502 uk. 600x900mm US32 2 bh 1,693,317.50 3,386,635.00
Lubang Kaca Handle Pintu 2 bh 70,000.00 140,000.00
Coak Path Fitting 2 bh 30,000.00 60,000.00
18,754,051.70

A.4.2.1.22 Memasang 1 m2 Atap Pelana rangka atap baja (canai dingin) profil C75
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.734 OH 110,000.00 80,740.00
Tukang Besi Konstruksi 0.734 OH 150,000.00 110,100.00
Kepala Tukang 0.073 OH 190,000.00 13,870.00
Mandor 0.037 OH 150,000.00 5,550.00
JUMLAH HARGA TENAGA 210,260.00
B BAHAN
Main Truss C-75,0.75 0.873 M1 26,667 23,280.00
JUMLAH HARGA BAHAN 23,280.00
C PERALATAN
10 %(bahan) 2,666.67

JUMLAH HARGA ALAT 2,666.67


D JUMLAH (A+B+C) 233,540.00
E Overhead dan Provit 15 % 35,031.00
F Harga Satuan Pekerjaan (D+E) 268,571.00
ANALISA HARGA SATUAN
PEKERJAAN DINDING
JDIH Kementrian PUPR 2022

7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 18.95 Kg 1,640.00 31,078.00
Pasir Pasang 0.038 M3 170,000.00 6,460.00
JUMLAH HARGA BAHAN 103,688.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 155,838.00
E Overhead dan Provit 15 % 23,375.70
F Harga Satuan Pekerjaan (D+E) 179,213.70

8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 14.37 Kg 1,640.00 23,566.80
Pasir Pasang 0.04 M3 170,000.00 6,800.00
JUMLAH HARGA BAHAN 96,516.80
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 148,666.80
E Overhead dan Provit 15 % 22,300.02
F Harga Satuan Pekerjaan (D+E) 170,966.82

9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 11.5 Kg 1,640.00 18,860.00
Pasir Pasang 0.043 M3 170,000.00 7,310.00
JUMLAH HARGA BAHAN 92,320.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 144,470.00
E Overhead dan Provit 15 % 21,670.50
F Harga Satuan Pekerjaan (D+E) 166,140.50
10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 9.68 Kg 1,640.00 15,875.20
Pasir Pasang 0.045 M3 170,000.00 7,650.00
JUMLAH HARGA BAHAN 89,675.20
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 141,825.20
E Overhead dan Provit 15 % 21,273.78
F Harga Satuan Pekerjaan (D+E) 163,098.98
ANALISA HARGA SATUAN
PEKERJAAN PLESTERAN
JDIH Kementrian PUPR 2022
Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.15 OH 150,000.00 22,500.00
Kepala Tukang L.03 0.015 OH 190,000.00 2,850.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 60,600.00
B BAHAN
Semen Portland 10.224 Kg 1,640.00 16,767.36
Pasir Pasang 0.02 M3 170,000.00 3,400.00
JUMLAH HARGA BAHAN 20,167.36
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 80,767.36
E Overhead dan Provit 15 % 12,115.10
F Harga Satuan Pekerjaan (D+E) 92,882.46

Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.15 OH 150,000.00 22,500.00
Kepala Tukang L.03 0.015 OH 190,000.00 2,850.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 60,600.00
B BAHAN
Semen Portland 7.776 Kg 1,640.00 12,752.64
Pasir Pasang 0.023 M3 170,000.00 3,910.00
JUMLAH HARGA BAHAN 16,662.64
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 77,262.64
E Overhead dan Provit 15 % 11,589.40
F Harga Satuan Pekerjaan (D+E) 88,852.04

Memasang 1 m2 plesteran 1 PC : 4 PP, tebal 15 mm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.15 OH 150,000.00 22,500.00
Kepala Tukang L.03 0.015 OH 190,000.00 2,850.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 60,600.00
B BAHAN
Semen Portland 6.24 Kg 1,640.00 10,233.60
Pasir Pasang 0.024 M3 170,000.00 4,080.00
JUMLAH HARGA BAHAN 14,313.60
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 74,913.60
E Overhead dan Provit 15 % 11,237.04
F Harga Satuan Pekerjaan (D+E) 86,150.64
Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.15 OH 150,000.00 22,500.00
Kepala Tukang L.03 0.015 OH 190,000.00 2,850.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 60,600.00
B BAHAN
Semen Portland 5.184 Kg 1,640.00 8,501.76
Pasir Pasang 0.026 M3 170,000.00 4,420.00
JUMLAH HARGA BAHAN 12,921.76
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 73,521.76
E Overhead dan Provit 15 % 11,028.26
F Harga Satuan Pekerjaan (D+E) 84,550.02

Memasang 1 m2 acian
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 110,000.00 11,000.00
Tukang Batu L.02 0.050 OH 150,000.00 7,500.00
Kepala Tukang L.03 0.005 OH 190,000.00 950.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 20,200.00
B BAHAN
Semen Portland 3.25 kg 1,640.00 5,330.00

JUMLAH HARGA BAHAN 5,330.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 25,530.00
E Overhead dan Provit 15 % 3,829.50
F Harga Satuan Pekerjaan (D+E) 29,359.50
ANALISA HARGA SATUAN
PEKERJAAN KAYU
Permen PUPR 2016
1 Membuat dan memasang 1 m3 kusen pintu dan kusen jendela, kayu kelas I
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 7 OH 110,000.00 770,000.00
Tukang Kayu 21 OH 150,000.00 3,150,000.00
Kepala Tukang 2.1 OH 190,000.00 399,000.00
Mandor 0.35 OH 150,000.00 52,500.00
JUMLAH HARGA TENAGA 4,371,500.00
B BAHAN
Balok kayu kelas I 1.1 M3 4,547,000 5,001,700.00
Paku 10 cm 1.25 Kg 23,000 28,750.00
Lem Kayu 1 Kg 21,000 21,000.00
JUMLAH HARGA BAHAN 5,051,450.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 9,422,950.00
E Overhead dan Provit 15 % 1,413,442.50
F Harga Satuan Pekerjaan (D+E) 10,836,392.50

2 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1 OH 110,000.00 110,000.00
Tukang Kayu 3 OH 150,000.00 450,000.00
Kepala Tukang 0.3 OH 190,000.00 57,000.00
Mandor 0.05 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 624,500.00
B BAHAN
Papan kayu kelas I 0.04 M3 4,547,000 181,880.00
Lem Kayu 0.5 kg 21,000 10,500.00
Engsel 2 bh 39,600 79,200.00
Kunci Tanam Antik 1 bh 184,500 184,500.00
Grendel Pintu Kuningan 1 bh 11,950 11,950.00
JUMLAH HARGA BAHAN 468,030.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,092,530.00
E Overhead dan Provit 15 % 163,879.50
F Harga Satuan Pekerjaan (D+E) 1,256,409.50

3 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.15 OH 110,000.00 16,500.00
Tukang Kayu 0.3 OH 150,000.00 45,000.00
Kepala Tukang 0.03 OH 190,000.00 5,700.00
Mandor 0.075 OH 150,000.00 11,250.00
JUMLAH HARGA TENAGA 78,450.00
B BAHAN
Kaso-kaso 5 x7 cm 0.0154 M3 2,360,000 36,344.00
Paku 7 cm – 10 cm 0.2 kg 23,000 4,600.00
JUMLAH HARGA BAHAN 40,944.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 119,394.00
E Overhead dan Provit 15 % 17,909.10
F Harga Satuan Pekerjaan (D+E) 137,303.10
4 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.2 OH 110,000.00 22,000.00
Tukang Kayu 0.3 OH 150,000.00 45,000.00
Kepala Tukang 0.03 OH 190,000.00 5,700.00
Mandor 0.01 OH 150,000.00 1,500.00
JUMLAH HARGA TENAGA 74,200.00
B BAHAN
Kaso-kaso 5 x7 cm 0.0163 M3 2,360,000 38,468.00
Paku 7 cm – 10 cm 0.25 kg 23,000 5,750.00
JUMLAH HARGA BAHAN 44,218.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 118,418.00
E Overhead dan Provit 15 % 17,762.70
F Harga Satuan Pekerjaan (D+E) 136,180.70

5 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 110,000.00 11,000.00
Tukang Kayu 0.2 OH 150,000.00 30,000.00
Kepala Tukang 0.02 OH 190,000.00 3,800.00
Mandor 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 45,550.00
B BAHAN
Papan kayu kelas I 0.011 M3 2,360,000 25,488.00
Paku 5 cm dan 7 cm 0.1 kg 23,000 2,300.00
JUMLAH HARGA BAHAN 27,788.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 73,338.00
E Overhead dan Provit 15 % 11,000.70
F Harga Satuan Pekerjaan (D+E) 84,338.70
ANALISA SATUAN PEKERJAAN
PEKERJAAN PENUTUP ATAP

6.38. 1 m2 Pasang Atap onduline JDIH Kementrian PUPR 2022


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.120 OH 110,000 13,200.00
Tukang Kayu 0.060 OH 150,000 9,000.00
Kepala Tukang 0.006 OH 190,000 1,140.00
Mandor 0.006 OH 150,000 900.00
JUMLAH HARGA TENAGA 24,240.00
B BAHAN
Atap Onduline Tile 0.633 m2 185,000 117,105.00
Paku Seng 0.020 Kg 47,000 940.00
JUMLAH HARGA BAHAN 118,045.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 142,285.00
E Overhead dan Provit 15 % 21,342.75
F Harga Satuan Pekerjaan (D+E) 163,627.75

6.38. 1 m1 Nok atap Ondiline


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.125 OH 110,000.00 13,750.00
Tukang Kayu 0.250 OH 150,000.00 37,500.00
Kepala Tukang 0.025 OH 190,000.00 4,750.00
Mandor 0.006 OH 150,000.00 900.00
JUMLAH HARGA TENAGA 56,900.00
B BAHAN
Nok Atap Onduline Tile 1.100 bh 110,000 121,000.00
Pake Seng 0.040 Kg 47,000 1,880.00
JUMLAH HARGA BAHAN 122,880.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 179,780.00
E Overhead dan Provit 15 % 26,967.00
F Harga Satuan Pekerjaan (D+E) 206,747.00

6.38. 1 m1 Liskplank Woodplank t 3 cm


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.100 OH 110,000.00 11,000.00
Tukang Kayu 0.200 OH 150,000.00 30,000.00
Kepala Tukang 0.020 OH 190,000.00 3,800.00
Mandor 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 45,550.00
B BAHAN
Liskplank 1.000 m1 28,000 28,000.00
Paku Secrup 0.100 Kg 42,000 4,200.00
JUMLAH HARGA BAHAN 32,200.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 77,750.00
E Overhead dan Provit 15 % 11,662.50
F Harga Satuan Pekerjaan (D+E) 89,412.50
6.36. 1 m2 Pasang Genteng Metal
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.200 OH 110,000.00 22,000.00
Tukang Kayu 0.100 OH 150,000.00 15,000.00
Kepala Tukang 0.010 OH 190,000.00 1,900.00
Mandor 0.001 OH 150,000.00 150.00
JUMLAH HARGA TENAGA 39,050.00
B BAHAN
Genteng metal spandek 0,25mm 1.300 M1 46,000 59,800.00
Paku Anti Karat untuk Atap metal 0.200 Kg 60,000 12,000.00
JUMLAH HARGA BAHAN 71,800.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 110,850.00
E Overhead dan Provit 15 % 16,627.50
F Harga Satuan Pekerjaan (D+E) 127,477.50
ANALISA SATUAN PEKERJAAN
PENUTUP LANTAI
Memasang 1 m2 Granit 60x60
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.24 OH 110,000.00 26,400.00
Tukang Kayu L.02 0.12 OH 150,000.00 18,000.00
Kepala Tukang L.03 0.012 OH 190,000.00 2,280.00
Mandor L.04 0.012 OH 150,000.00 1,800.00
JUMLAH HARGA TENAGA 48,480.00
B BAHAN
Granit 3.1 bh 72,000.00 223,200.00
Semen 9.6 kg 1,640.00 15,744.00
Pasir Pasang 0.045 m3 170,000.00 7,650.00
Semen warna 1.5 kg 5,300.00 7,950.00
JUMLAH HARGA BAHAN 254,544.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 303,024.00
E Overhead dan Provit 15 % 45,453.60
F Harga Satuan Pekerjaan (D+E) 348,477.60

Memasang 1 m2 Keramik 60x60


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.24 OH 110,000.00 26,400.00
Tukang Kayu L.02 0.12 OH 150,000.00 18,000.00
Kepala Tukang L.03 0.012 OH 190,000.00 2,280.00
Mandor L.04 0.012 OH 150,000.00 1,800.00
JUMLAH HARGA TENAGA 48,480.00
B BAHAN
Keramik Tekstur Kasar 60x60 3.1 bh 47,000.00 145,700.00
Semen 9.6 kg 1,640.00 15,744.00
Pasir Pasang 0.045 m3 170,000.00 7,650.00
Semen warna 1.5 kg 5,300.00 7,950.00
JUMLAH HARGA BAHAN 177,044.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 225,524.00
E Overhead dan Provit 15 % 33,828.60
F Harga Satuan Pekerjaan (D+E) 259,352.60

A.4.4.3.36 Memasang 1 m2 Keramik 30x30 s/d 40x40


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.7 OH 110,000.00 77,000.00
Tukang Kayu L.02 0.35 OH 150,000.00 52,500.00
Kepala Tukang L.03 0.035 OH 190,000.00 6,650.00
Mandor L.04 0.035 OH 150,000.00 5,250.00
JUMLAH HARGA TENAGA 141,400.00
B BAHAN
Keramik Warna 40x40 1.05 Duz 72,700.00 76,335.00
Semen 10 kg 1,640.00 16,400.00
Pasir Pasang 0.045 m3 170,000.00 7,650.00
Semen warna 0.5 kg 5,300.00 2,650.00
JUMLAH HARGA BAHAN 103,035.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 244,435.00
E Overhead dan Provit 15 % 36,665.25
F Harga Satuan Pekerjaan (D+E) 281,100.25
A.4.4.3.35 Memasang 1 m2 Keramik 20x20 s/d 30x30
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.7 OH 110,000.00 77,000.00
Tukang Batu L.02 0.35 OH 150,000.00 52,500.00
Kepala Tukang L.03 0.035 OH 190,000.00 6,650.00
Mandor L.04 0.035 OH 150,000.00 5,250.00
JUMLAH HARGA TENAGA 141,400.00
B BAHAN
Keramik Warna 1.05 Duz 54,300.00 57,015.00
Semen 10.4 kg 1,640.00 17,056.00
Pasir Pasang 0.045 m3 170,000.00 7,650.00
Semen warna 0.5 kg 5,300.00 2,650.00
JUMLAH HARGA BAHAN 84,371.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 225,771.00
E Overhead dan Provit 15 % 33,865.65
F Harga Satuan Pekerjaan (D+E) 259,636.65

Memasang 1 m2 Dinding Keramik 20x20


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.9 OH 110,000.00 99,000.00
Tukang Kayu L.02 0.45 OH 150,000.00 67,500.00
Kepala Tukang L.03 0.045 OH 190,000.00 8,550.00
Mandor L.04 0.045 OH 150,000.00 6,750.00
JUMLAH HARGA TENAGA 181,800.00
B BAHAN
Keramik Warna 20x20 26 bh 2,172.00 56,472.00
Semen 9.3 kg 1,640.00 15,252.00
Pasir Pasang 0.018 m3 170,000.00 3,060.00
Semen warna 1.94 kg 5,300.00 10,282.00
JUMLAH HARGA BAHAN 85,066.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 266,866.00
E Overhead dan Provit 15 % 40,029.90
F Harga Satuan Pekerjaan (D+E) 306,895.90

Memasang 1 m' Plint Granit 10x60


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.09 OH 110,000.00 9,900.00
Tukang Kayu L.02 0.09 OH 150,000.00 13,500.00
Kepala Tukang L.03 0.009 OH 190,000.00 1,710.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 25,860.00
B BAHAN
Keramik plint 10x60 1.7 bh 8,200.00 13,940.00
Semen 1.14 kg 1,640.00 1,869.60
Pasir Pasang 0.1 m3 170,000.00 17,000.00
Semen warna 0.003 kg 5,300.00 15.90
JUMLAH HARGA BAHAN 32,825.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 58,685.50
E Overhead dan Provit 15 % 8,802.83
F Harga Satuan Pekerjaan (D+E) 67,488.33
A.4.4.3.36 Memasang 1 m2 Keramik 30x30 s/d 40x40
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.25 OH 110,000.00 27,500.00
Tukang Kayu L.02 0.125 OH 150,000.00 18,750.00
Kepala Tukang L.03 0.013 OH 190,000.00 2,470.00
Mandor L.04 0.013 OH 150,000.00 1,950.00
JUMLAH HARGA TENAGA 50,670.00
B BAHAN
Keramik Warna 40x40 6.63 bh 12,116.67 80,333.50
Semen 9.8 kg 1,640.00 16,072.00
Pasir Pasang 0.045 m3 170,000.00 7,650.00
Semen warna 1.3 kg 5,300.00 6,890.00
JUMLAH HARGA BAHAN 110,945.50
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 161,615.50
E Overhead dan Provit 15 % 24,242.33
F Harga Satuan Pekerjaan (D+E) 185,857.83

A.4.4.3.64 Memasang 1 m2 Pavingblock tebal 8 cm


Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.5 OH 110,000.00 55,000.00
Tukang Kayu L.02 0.5 OH 150,000.00 75,000.00
Kepala Tukang L.03 0.05 OH 190,000.00 9,500.00
Mandor L.04 0.0013 OH 150,000.00 195.00
JUMLAH HARGA TENAGA 139,695.00
B BAHAN
Pavingblock 1.01 m2 130,000.00 131,300.00
Pasir Beton 0.08 m3 159,500.00 12,760.00
JUMLAH HARGA BAHAN 144,060.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 283,755.00
E Overhead dan Provit 15 % 42,563.25
F Harga Satuan Pekerjaan (D+E) 326,318.25
ANALISA HARGA SATUAN
PEKERJAAN LANGIT-LANGIT

Memasang 1 m’ list langit-langit Kayu profil 5x5 cm


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.035 OH 110,000.00 3,850.00
Tukang Kayu 0.035 OH 150,000.00 5,250.00
Kepala Tukang 0.0035 OH 190,000.00 665.00
Mandor 0.0021 OH 150,000.00 315.00
JUMLAH HARGA TENAGA 10,080.00
B BAHAN
List Kayu Profil 5/5 cm klas II 1.05 m’ 31,000.00 32,550.00

JUMLAH HARGA BAHAN 32,550.00


C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 42,630.00
E Overhead dan Provit 15 % 6,394.50
F Harga Satuan Pekerjaan (D+E) 49,024.50

Memasang 1 m2 langit-langit gypsum ukuran (1200x2400x4) mm JDIH Kementrian PUPR 2022


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 110,000.00 11,000.00
Tukang Kayu 0.05 OH 150,000.00 7,500.00
Kepala Tukang 0.005 OH 190,000.00 950.00
Mandor 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 20,200.00
B BAHAN
Kalsiboard (120x240x4)mm 0.364 Lembar 94,000.00 34,216.00
Paku Sekrup 0.11 kg 42,000.00 4,620.00
JUMLAH HARGA BAHAN 38,836.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 59,036.00
E Overhead dan Provit 15 % 8,855.40
F Harga Satuan Pekerjaan (D+E) 67,891.40

Memasang 1 m’ list plafond gysum profil JDIH Kementrian PUPR 2022


Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.06 OH 110,000.00 6,600.00
Tukang Kayu 0.06 OH 150,000.00 9,000.00
Kepala Tukang 0.006 OH 190,000.00 1,140.00
Mandor 0.003 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 17,190.00
B BAHAN
List gypsum profil 12/12 cm 1.05 m’ 31,000.00 32,550.00
Tepung gypsum 0.15 kg 1,500.00 225.00
JUMLAH HARGA BAHAN 32,775.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 49,965.00
E Overhead dan Provit 15 % 7,494.75
F Harga Satuan Pekerjaan (D+E) 57,459.75
Memasang 1 m2 langit-langit lambrisering kayu tebal 9 mm JDIH Kementrian PUPR 2022
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 110,000.00 88,000.00
Tukang Kayu 0.8 OH 150,000.00 120,000.00
Kepala Tukang 0.08 OH 190,000.00 15,200.00
Mandor 0.04 OH 150,000.00 6,000.00
JUMLAH HARGA TENAGA 229,200.00
B BAHAN
Kayu Papan 0.015 m3 2,360,000.00 35,400.00
Paku Tripleks 0.01 kg 19,000.00 190.00
JUMLAH HARGA BAHAN 35,590.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 264,790.00
E Overhead dan Provit 15 % 39,718.50
F Harga Satuan Pekerjaan (D+E) 304,508.50

Memasang 1 m2 langit-langit papan kayu Jati T 20 mm L 80-100m JDIH Kementrian PUPR 2022
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 110,000.00 88,000.00
Tukang Kayu 0.8 OH 150,000.00 120,000.00
Kepala Tukang 0.08 OH 190,000.00 15,200.00
Mandor 0.04 OH 150,000.00 6,000.00
JUMLAH HARGA TENAGA 229,200.00
B BAHAN
Kayu Papan 0.015 m3 2,360,000.00 35,400.00
Paku 5cm 0.01 kg 23,000.00 230.00
JUMLAH HARGA BAHAN 35,630.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 264,830.00
E Overhead dan Provit 15 % 39,724.50
F Harga Satuan Pekerjaan (D+E) 304,554.50
ANALISA HARGA SATUAN
PEKERJAAN PENGECATAN
JDIH Kementrian PUPR 2022
6.14. 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.020 OH 110,000.00 2,200.00
Tukang Cat 0.063 OH 150,000.00 9,450.00
Kepala Tukang 0.0063 OH 190,000.00 1,197.00
Mandor 0.0030 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 13,297.00
B BAHAN
Plamir Tembok 0.100 Kg 25,500 2,550.00
Cat Dasar Tembok (standart) 0.100 Kg 38,200 3,820.00
Cat Penutup Tembok (standart) 0.260 Kg 46,000 11,960.00
JUMLAH HARGA BAHAN 18,330.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 31,627.00
E Overhead dan Provit 15 % 4,744.05
F Harga Satuan Pekerjaan (D+E) 36,371.05

6.20. 1 m2 Pengecatan Permukaan Baja dengan Meni Besi


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.020 OH 110,000.00 2,200.00
Tukang Cat 0.200 OH 150,000.00 30,000.00
Kepala Tukang 0.020 OH 190,000.00 3,800.00
Mandor 0.0025 OH 150,000.00 375.00
JUMLAH HARGA TENAGA 36,375.00
B BAHAN
Cat Meni Besi 0.100 Kg 15,400 1,540.00
Kuas 0.010 Bh 29,000 290.00
JUMLAH HARGA BAHAN 1,830.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 38,205.00
E Overhead dan Provit 15 % 5,730.75
F Harga Satuan Pekerjaan (D+E) 43,935.75

6.26. Mengecatan 1 m2 Plafond (3 Lapis)


Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.200 OH 110,000.00 22,000.00
Tukang Cat 0.300 OH 150,000.00 45,000.00
Kepala Tukang 0.030 OH 190,000.00 5,700.00
Mandor 0.010 OH 150,000.00 1,500.00
JUMLAH HARGA TENAGA 74,200.00
B BAHAN
Cat tembok setara 0.150 Kg 46,000 6,900.00
Rol Cat 0.010 bh 26,200 262.00
Amplas Halus 0.500 lbr 1,000 500.00

JUMLAH HARGA BAHAN 7,662.00


C PERALATAN
Alat Bantu 1 Ls 2,000.00 2,000.00
-
JUMLAH HARGA ALAT 2,000.00
D JUMLAH (A+B+C) 83,862.00
E Overhead dan Provit 15 % 12,579.30
F Harga Satuan Pekerjaan (D+E) 96,441.30
6.13. 1 m2 Pelaburan Bidang Kayu dengan Vernis
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.160 OH 110,000.00 17,600.00
Tukang Cat 0.160 OH 150,000.00 24,000.00
Kepala Tukang 0.016 OH 190,000.00 3,040.00
Mandor 0.0030 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 45,090.00
B BAHAN
Vernis 0.150 Ltr 36,900 5,535.00
dempul kayu 0.050 Kg 300 15.00
Ampelas 0.100 Lbr 1,000 100.00
Kuas 5" 0.010 Bh 14,100 141.00
JUMLAH HARGA BAHAN 5,791.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 50,881.00
E Overhead dan Provit 15 % 7,632.15
F Harga Satuan Pekerjaan (D+E) 58,513.15

A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lapis cat dasar 2 lapis cat Penutup)
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.070 OH 110,000.00 7,700.00
Tukang Cat 0.009 OH 150,000.00 1,350.00
Kepala Tukang 0.006 OH 190,000.00 1,140.00
Mandor 0.0030 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 10,640.00
B BAHAN
Cat meni 0.200 Kg 27,700 5,540.00
plamur 0.150 Kg 25,500 3,825.00
cat dasar 0.170 Kg 52,000 8,840.00
cat penutup 0.260 Kg 62,400 16,224.00
pengencer 0.010 Kg 46,500 465.00
Ampelas 0.030 Lbr 1,000 30.00
Kuas 5" 0.200 Bh 34,300 6,860.00
JUMLAH HARGA BAHAN 41,784.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 52,424.00
E Overhead dan Provit 15 % 7,863.60
F Harga Satuan Pekerjaan (D+E) 60,287.60

A.4.7.1.21 1 m2 Pengecatan permukaan besi galvanis secara semprot 3 lapis cat mutakhir
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.400 OH 110,000.00 44,000.00
Tukang Cat 0.700 OH 150,000.00 105,000.00
Kepala Tukang 0.070 OH 190,000.00 13,300.00
Mandor 0.020 OH 150,000.00 3,000.00
JUMLAH HARGA TENAGA 165,300.00
B BAHAN
cat dasar 0.300 kg 52,000 15,600.00
pengencer 0.010 ltr 46,500 465.00
JUMLAH HARGA BAHAN 16,065.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 181,365.00
E Overhead dan Provit 15 % 27,204.75
F Harga Satuan Pekerjaan (D+E) 208,569.75
A.4.7.1.20 1 m2 Pengecatan permukaan besi galvanis secara manual 3 lapis
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.400 OH 110,000.00 44,000.00
Tukang Cat 0.800 OH 150,000.00 120,000.00
Kepala Tukang 0.080 OH 190,000.00 15,200.00
Mandor 0.020 OH 150,000.00 3,000.00
JUMLAH HARGA TENAGA 182,200.00
B BAHAN
cat dasar 0.110 kg 52,000 5,720.00
cat antara 0.170 kg 62,400 10,608.00
cat penutup 0.080 kg 62,400 4,992.00
pengencer 0.010 ltr 46,500 465.00
Kuas 5" 0.010 Bh 34,300 343.00
JUMLAH HARGA BAHAN 22,128.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 204,328.00
E Overhead dan Provit 15 % 30,649.20
F Harga Satuan Pekerjaan (D+E) 234,977.20
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PEKERJAAN : PEMBANGUNAN KANTOR DINAS PERPUSTAKAAN DAN KEARSIPAN DAERAH
LOKASI : KABUPATEN MUNA
TAHUN ANGGARAN : 2022
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
I UPAH KERJA
1 Mandor Oh
2 Pekerja Oh
3 Kepala Tukang Oh
4 Tukang Kayu Oh
5 Tukang Batu Oh
6 Tukang Cat Oh
7 Tukang Las Biasa Oh
8 Tukang las Konstruksi Oh
9 Tukang Gali Oh
10 Tukang Besi Konstruksi Oh
11 Tukang Khusus alluminium Oh
12 Tukang Oh
13 Tukang Alluminium/Kaca Oh
14 Tukang Pipa Oh
II HARGA BAHAN
Semen Portland Kg
Semen Abu-abu Kg
Semen Merah M3
Semen Warna Kg
Semen Nat Kg
Kawat Bidrat/ kawat beton Kg
Tiang Pancang Beton Dia 30 cm m1
Handling tiang pancang di site Batang
Pemancangan Tiang m1
Penyambungan Tiang titik
Potong Kepala Tiang titik
Buis Beton 30 cm bh
Besi Beton Polos Kg
Besi Beton Ulir Kg
Besi pipa galvanis 6 '' kg
Besi pipa galvanis 2.5 '' kg
Besi beton D 6'' -12 m Batang
Besi beton D 8'' -12 m Batang
Besi beton D 10'' -12 m Batang
Besi beton D 12'' -12 m Batang
Besi beton D 14'' -12 m Batang
Besi beton D 16'' -12 m Batang
Rangka Plafond hollow 40.40.2 mm M
Rangka Plafond hollow 20.40.2 mm M
Assesoris rangka besi hollow dinding partisi Ls
Assesoris rangka besi hollow plafond Ls
Besi Profil Kg
Besi strip tebal 5 mm Kg
Besi Baja WF 400x200x8x13 mm Kg
Besi Baja WF 350x175x7x11 mm(harga surabaya) kg
Mobilisasi surabaya - Rha Ls
Besi Baja WF 200x100x5,8x8 mm(harga surabaya) kg
Mobilisasi surabaya - Raha Ls
Besi Baja WF 100x50x5x7 mm(harga surabaya) kg
Mobilisasi surabaya - Rah Ls
Besi Baja WF 150x75x5x7 mm(harga surabaya) kg
Mobilisasi surabaya - Ra Ls
Besi Baja WF 300x150x6,5x9 mm(harga surabaya) kg
Mobilisasi surabaya - Rh Ls
Atap Bitumen (Onduvila) Lbr
Atap Spandek silver 0,55 mm M1
Nok Atap Onduvilla Lbr
Liskplank Woodplank M1
Besi Hollow 2.4.0,4 cm M
Besi Hollow 4.4.0,4 cm M
Kalsiclad 1200.2700.10 mm M2
ACP M2
ACP Cutting M2
Alumunium Profil uk.3''-4.00 m natural batang
Alumunium Profil uk.4''-4.00 m natural batang
Alumunium strip 6 mm m2
Alumunium strip 8 mm m2
profil daun jendela lebar 8 cm m1 Profil Allumunium Jendela Casemen
profil daun jendela lebar 10 cm m1
panel sunscreen alumunium coloubond m2
pintu alumunium m2
Rolling door one sheet m2
Handle alumunium m2
Karet aksesoris pintu dan jendela m2
Jalusi alumunium m2
sunscreen alumunium m2
Sealent tube
karet kaca m
paku tembak payung bh
kaca tempered m2
Overpanel Pivot Patch Fitting PT 2240 US32 bh
Top Patch Fitting PT 2220 US32 bh
Bottom Patch Fitting PT 2210 US32 bh
Floor Hinge FH 84FB S bh
Patch Lock US2210 US32 bh
Double Cylinder DC.Fn1001-60 US14 bh
Pull Handle GHD4502 uk. 600x900mm US32 bh
Wiremesh m 10 m2
Wioremesh m 6 m2
Bondek m2
Besi plat baja kg
plate strip T 5-12 L 38-75 kg
plate strip T 6-12 L 100 kg
baut/mur kg
Dynabolt 10x60 mm bh
Dynabolt 10x80 mm bh
Dynabolt 12x12 mm bh
Baut besi 5/8-30 cm Batang
Baut besi 5/8-12 cm Batang
Baut besi 1/2-35 cm Batang
Baut besi 1/2-37 cm Batang
Baut besi 1/2-27 cm Batang
Baut besi 1/2-25 cm Batang
Baut besi 1/2-22 cm Batang
Baut besi 1/2-18 cm Batang
Baut besi 1/2-15 cm Batang
Baut besi 1/2-12 cm Batang
baut D16 mm P 450 mm bh
baut D12 mm P 250 mm bh
baut D12 mm P 350 mm bh
baut D10 mm P 150 mm bh
baut D10 mm P 200 mm bh
baut D80 mm P 120 mm bh
besi siku 4,2x40
Besi siku2,2x3
Besi siku 3,2x40
Besi siku L 30.30.3 kg
Besi scuare tube m
Besi lis kaca (1 x 1) cm m
Baja strip (0,2 x 2) cm kg
Besi angkur φ =8 mm kg
Paku Kg
Paku Biasa Kg
Paku Biasa 2" - 5" Kg
Paku Biasa 1/2" - 1" Kg
Paku 12 cm Kg
Paku Pancing Kg
Paku Hak Panjang 15 cm Kg
Paku Sekrup Kg
Paku skrup 10 cm Kg
Paku Sekrup 3,5" Kg
Paku skrup 1 cm – 2,5 cm Kg
Paku 1 cm - 2,5 cm Kg
Paku 5 cm – 12 cm Kg
Paku 5 cm – 10 cm Kg
Paku 5 cm – 7 cm Kg
Paku 7 cm – 10 cm Kg
Paku 5 cm dan 7 cm Kg
Paku 5 cm dan 10 cm Kg
Paku 10 cm Kg
Paku 12 cm Kg
Paku tripleks Kg
Paku Seng Kg
Skrup fixer bh
Kawat diameter 4 mm Kg
Kawat Duri Kg
Kawat Beton Kg
Kawat Nyamuk M2
kawat las Stainlesteel kg
Stainlesteel Kotak 40/40 mm M
Stainlesteel Kotak 20/40 mm M
Besi Plat 2.2x30 mm M
Besi Siku 40x40 mm M
Kawat las listrik kg
Jaring kawat baja dilas Kg
Truss C75.35.7 chord m1
Reng Botton U33.045 m1
Strap Bracing m1
Screw 12-14x20 HolDip Galvanized buah
Screw 10-16x16 HolDip Galvanized buah
Dynabol dia-12 x 120 mm Bh
Keramik warna 40 x 40 cm Bh
Keramik putih 40 x 40 cm Bh
Keramik warna 30 x30 cm Bh
Keramik putih 30 x 30 cm Bh
Keramik Warna 20 x 25 cm Bh
Keramik Putih 20 x 25 cm Bh
Keramik Warna 20 x 20 cm Bh
Granite (Kasar) 60 x 60 bh
Granite 60 x 60 bh
Granite (sejenis) 60 x 60 Cm bh
Keramik warna Lis 10 x 40 cm Bh
Keramik warna lis 10 x 60 cm Bh
Keramik Artistik 10 x 20 cm Bh
Keramik Artistik 5 x 20 cm Bh
Paving Block M2 M2
Paving Block Bh
Karpet m2
Under Layer Bh
Batu Alam 15x30 M2
Kaca, Tebal 5 mm M2
Kaca, Tebal 8 mm M2
Kaca Buram, Tebal 12 mm M2
Kaca Cermin, Tebal 5 mm M2
Kaca Cermin, Tebal 6 mm M2
Kaca Cermin, Tebal 8 mm M2
Kaca Wireglass, Tebal 5 mm M2
Kaca Patri, Tebal 5 mm M2
Triplex 3 mm (122x244 Cm) lbr
Plywood 4 mm Lbr
Plywood 4 mm (90 x 220) Lbr
Plywood 4" x 8" x 6 mm Lbr
Plywood Tebal 9 mm Lbr
Tepung gypsum kg
Kalsiboard (120x240x4)mm lbr
Akustik Ukuran 30 x 30 cm Lbr
Akustik Ukuran 30 x 60 cm Lbr
Akustik Ukuran 60 x 120 cm Lbr
List gypsum profil 10/10 cm M
List Kayu Profil 5/5 cm klas II M
List gypsum profil 12/12 cm M
List Gypsum 2/5 M
Seng Gelombang 3" - 5 " kaki
Seng Gelombang 3' x 6" Bjls. 28 Lbr
Cat Dasar Kayu Kg
Cat Penutup Kayu Kg
Cat Penutup Kayu (2 Kali) Kg
Cat Penutup Kayu (3 Kali) Kg
Cat Dasar Tembok (standart) Kg
Cat Penutup Tembok (standart) Kg
Cat Dasar Tembok (anti lumut) Kg
Cat Penutup Tembok (Dulux) Kg
Cat Permukaan Baja Kg
Cat Baja Kg
Cat Dasar Baja Kg
Cat Antara Baja Kg
Cat Penutup Baja Kg
Cat Meni Kg
Plamir / dempul Kayu Kg
Plamir Tembok Kg
Politur Ltr
Politur Jadi Ltr
Soda Api Kg
Sabun Kg
Ampelas Lbr
Kuas Bh
Kalkarium Kg
Alang-Alang Ikat
Wall Paper M3
Residu Ltr
Pengencer Ltr
air Ltr
Teak Oil Ltr
Minyak Bekisting/ minyak cat Ltr
Lem Kayu Kg
Dempul fiber Kg
Cat dasar fiber Kg
Cat penutup fiber Kg
Tiner/ pengencer Ltr
Vernis Ltr
Kunci Tanam Bh
Kunci Tanam Antik Bh
Kunci Tanam Biasa Bh
Kunci Tanam Kamar Mandi Bh
Kunci Silinder Bh
Kunci Selot Pintu Bh
Kunci Selot Jendela Bh
Engsel Pintu Bh
Engsel Jendela Bh
Kait Angin Bh
Handle Pintu 40 cm stainlesteel Bh
Kloset Duduk lengkap Tabung Standart Bh
Kloset Duduk + jetwasher (lengkap 1 set) ex toto Bh
Kloset Jongkok Porselen Bh
Kloset Jongkok Teraso Bh
Urinoir Bh
Wastafel Standar Bh
Washtafel Ex toto (lengkap)+kran Bh
Urinoir Ex toto ( lengkap) + kran Bh
Bak Fibreglass Bh
Bak Cuci Stainless Steel 1 lubang Bh
Bak Cuci Teraso Bh
Badkip ex. Toto lengkap Kg
Hand Shower Standart Bh
Seal Tape Bh
Gymfloor M2
Floor Drain stainlesteel Bh
Tank Air Fiber 1200 liter Bh
Floor Hardener
Pipa Tanah Bh
Pipa Beton Bh
Pipa Galvanis Diameter 1/2" M'
Pipa Galvanis Diameter 3/4" M'
Pipa Galvanis Diameter 1" M'
Pipa Galvanis Diameter 1 1/2" M'
Pipa Galvanis Diameter 3" M'
Pipa Galvanis Diameter 4" M'
Pipa PVC Tipe AW Diameter 1/2" M'
Pipa PVC Tipe AW Diameter 3/4" M'
Pipa PVC Tipe AW Diameter 1" M'
Pipa PVC Tipe AW Diameter 1 1/2" M'
Pipa PVC Tipe AW Diameter 2" M'
Pipa PVC Tipe AW Diameter 2 1/2" M'
Pipa PVC Tipe AW Diameter 3" M'
Pipa PVC Tipe AW Diameter 4" M'
Pipa Gyp diamenetr 3 inci Set
Kran Air 3/4" Bh
Kran Air1/2" Bh
Waterstop Lebar 150 mm M'
Waterstop Lebar 200 mm M'
Waterstop Lebar 230 mm M'
Instalasi Lampu Ttk
Instalasi AC Ttk
Instalasi TV/ TV Kabel Ttk
Saklar Tunggal Bh
Saklar Ganda Bh
Stop Kontak Bh
Lampu Tanam SL 20 watt Bh
Lampu TL18 Watt Bh
Lampu TL 25 Watt Bh
Lampu Tempel Tiang Bh
Lampu LED Kuning Bh
BAHAN LOKAL
Tanah Timbunan Pilihan M3
Tanah Timbunan Biasa M3
Pasir Urug M3
Pasir Beton Maligano M3
Pasir Pasang M3
Batu Belah M3
Batu Pecah 2-3 cm (Pecah Manual) M3
Batu Granito Kg
Batu Teraso Kg
Batu Apung Kg
Kerikil Beton Maligano (Pecah manual) M3
Kerikil Kali maligano M3
Batu Merah 5 x 11 x 22 cm Bh
Bata Berongga Bh
Bata Pelapis Dinding Bh
Bata Poros Bh
Bata Tempel Hitam Bh
Lisplank GRC 30 CM M
Papan kayu Jati M3
Papan kayu kelas I M3
Papan kayu kelas II m3
Lambersering kayu klas I m3
Papan kayu kelas III (perancah) M3
Balok kayu Jati M3
Balok kayu kelas I M3
Balok kayu kelas II M3
Balok Kayu Kelas III (perancah) M3
Reng (3 x 4) cm Kelas II M3
Kayu 5/7 klas II M3
Kusen Alumunium M1
Bingkai/Daun Jendela Alumunium M2
Bambu Dia. 6 - 8/600 cm Btg
Dolken dia. 5 cm Btg
Dolken dia. 8 - 10 cm Btg
Dolken dia.15 cm Btg
Besi Kotak 12 mm (ut teralis jendela) 12 m/btg M
Perancah kayu kayu klas III M3
Carpet M2
Underlyer Tebal 6 mm/Rubber Corrugated M2
Parquet M2
Lem vinyl Kg
Wall Paper m
Mastercron "S" Kg
Aluminium C Kg
Aluminium B Kg
Strorox – 100 Kg
Formite/penjaga jarak bekisting/spacer btg
Pengelasan cm
Sealant tube
Paving Blok 8/10/20 Bh
Las cm
Alluminium strip m
Venetions blinds dan vertical blinds (tirai) m2
Solar Ltr
Minyak pelumas Ltr
BBM ltr
Ramset bh
III LANDSECAPE
Pohon Palem Batang
Pohon Mahoni Batang
Pohon Tram Besi/suar Batang
Pohon cendana Batang
Pohon Glodokan Batang
Pohon Johar Batang
Pupuk Kandang Karung
Furadan Kg
Rumput Gaja Mini M2
Bambu Krisik Jepang Batang

IV SEWA ALAT
Sewa alat perakitan jam
Sewa alat las listrik jam
Mesin Pancang Ls
Alat Bantu Pengecatan m2
Alat bantu pasang baja ringan m2
Mobilisasi alat baja ringan Ls
V PERALATAN K3 DAN PENCEGAHAN COVID 19
Helm Kerja Buah
Sepatu Lumpur Pasang
Masker N95 Buah
Sarung Tangan Karet Lateks Pasang
Hand Sanitizer Liter
Pengukur Suhu Tubuh Digital Buah
Safety Belt Buah
Peralatan P3K & Obat-Obatan Ls
ANALISA HARGA SATUAN
PEKERJAAN KUNCI DAN KACA
JDIH Kementrian PUPR 2022
6.17. 1 M2 Pasang Kaca, Tebal 5 mm
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 110,000.00 1,650.00
Tukang Kayu 0.150 OH 150,000.00 22,500.00
Kepala Tukang 0.015 OH 190,000.00 2,850.00
Mandor 0.008 OH 150,000.00 1,200.00
JUMLAH HARGA TENAGA 28,200.00
B BAHAN
Kaca, Tebal 5 mm 1.100 M2 225,000 247,500.00
Sealent 0.050 kg 25,000 1,250.00
JUMLAH HARGA BAHAN 248,750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 276,950.00
E Overhead dan Provit 15 % 41,542.50
F Harga Satuan Pekerjaan (D+E) 318,492.50

Anda mungkin juga menyukai