[HPS]
[ HASIL PERKIRAAN SNDIRI )
TAHUN 2022
R E K A P I T U L A S I (HPS)
SATKER : DINAS PERPUSTAKAAN DAN KEARSIPAN
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
LOKASI : KABUPATEN MUNA
TAHUN : 2022
TERBILANG : SEPULUH MILIAR SERATUS LIMA PULUH TIGA JUTA DELAPAN RATUS EMPAT BELAS RIBU
RUPIAH
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
III PEKERJAAN ARSITEKTUR
A Pekerjaan Tanah dan Pondasi
1 Pek. Urugan Tanah didatangkan (Bawah Lantai ) m3 715.02 178,135.00 127,370,087.70
2 Pek. Urugan Pasir Bawah Lantai m3 23.87 259,785.00 6,200,028.81
3 Pek. Urugan Pasir Bawah Anstamping m3 3.54 259,785.00 919,638.90
4 Pek. Pas. Batu Kosong m3 14.16 551,310.00 7,806,549.60
5 Pek. Pas. Batu Gunung m3 37.52 996,958.00 37,409,851.99
B Pekerjaan Dinding
1 Lantai 01
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 447.56 163,098.98 72,997,231.88
2 Lantai 02 Elev.+ 3.80
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 364.15 163,098.98 59,392,656.67
3 Lantai 03 Elev.+ 7.40
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 483.62 163,098.98 78,877,928.71
4 Topfloor
Pas. Dinding 1/2 Bata Camp 1 Ps : 4 Pp m2 142.39 163,098.98 23,223,272.32
C Pekerjaan Plesteran, Acian & Pengecatan
1 Lantai 01
Plesteran Dinding Camp 1 Ps : 4 Pp m2 895.13 86,150.64 77,115,850.08
Acian Dinding, Kolom dan Balok Luar m2 1,074.28 29,359.50 31,540,411.74
Pengecatan Dinding Dalam & Luar m2 999.21 36,371.05 36,342,244.13
2 Lantai 02
Plesteran Dinding Camp 1 Ps : 4 Pp m2 728.30 86,150.64 62,743,683.41
Acian Dinding, Kolom dan Balok Luar m2 891.83 29,359.50 26,183,594.81
Pengecatan Dinding Dalam & Luar m2 503.74 36,371.05 18,321,589.10
3 Lantai 03
Plesteran Dinding Camp 1 Ps : 4 Pp m2 967.24 86,150.64 83,328,345.03
Acian Dinding, Kolom dan Balok Luar m2 1,130.77 29,359.50 33,198,695.02
Pengecatan Dinding Dalam & Luar m2 623.21 36,371.05 22,666,802.07
4 Top Floor
Plesteran Dinding dan Kolom Praktis m2 304.71 86,150.64 26,250,720.29
Acian Dinding dan Kolom Praktis m2 304.71 29,359.50 8,946,051.04
Pengecatan Dinding Dalam & Luar m2 73.58 36,371.05 2,676,181.86
D Pekerjaan Kusen+daun Pintu jendela dan Ventilasi
1 Lantai 01
a Kusen Alumunium 4' Coathing Powder
J1 Kusen Jendela Type J1 m1 39.28 192,855.00 7,575,344.40
Kaca 5 mm m2 14.72 318,492.50 4,688,209.60
J2 Kusen Jendela Type J2 m1 266.20 192,855.00 51,338,001.00
Kaca 5 mm m2 51.48 318,492.50 16,395,993.90
Duan Jendela Alumunium m1 161.04 210,128.00 33,839,013.12
J6 Kusen Jendela Type J6 m1 5.61 192,855.00 1,081,916.55
Kaca 5 mm m2 1.17 318,492.50 372,636.23
Duan Jendela Alumunium m1 1.34 210,128.00 281,571.52
V1 Kusen Ventilasi Type V1 m1 4.40 192,855.00 848,562.00
Kaca 5 mm m2 0.44 318,492.50 140,136.70
Duan Jendela Alumunium m1 4.20 210,128.00 882,537.60
b Kusen Pintu Kayu Kls I
Kusen Pintu Type P1 m3 0.10 10,836,392.50 1,098,810.20
Kusen Pintu Type P2 m3 0.03 10,836,392.50 345,139.10
Kusen Pintu Type P3 m3 0.06 10,836,392.50 690,278.20
Kusen Pintu Type P5 m3 0.06 10,836,392.50 648,016.27
Pengecatan Kusen m2 13.13 60,287.60 791,757.05
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
c Daun Pintu Panil Kayu Kls I
Daun Pintu Type P1 m2 8.13 1,256,409.50 10,208,578.47
Daun Pintu Type P2 m2 1.82 1,256,409.50 2,287,167.85
Daun Pintu Type P3 m2 3.64 1,256,409.50 4,574,335.71
Daun Pintu Type P5 m2 2.66 1,256,409.50 3,347,074.91
Pengecatan Pintu m2 32.50 60,287.60 1,959,395.23
d Kusen Ventilasi Kayu KLs I
Kusen Ventilasi Type 2 m3 0.11 10,836,392.50 1,239,683.30
Kaca 5 mm Ventilasi type 2 m2 2.40 318,492.50 764,382.00
e Pek. Pintu Kaca Tempered
Pintu Kaca Tempered Type PJ1 Unit 1.00 18,754,051.70 18,754,051.70
Kusen Jendela m1 15.40 192,855.00 2,969,967.00
Kaca 5 mm m2 6.74 318,492.50 2,146,639.45
f Pek. Pintu pvc (P5)
Pintu dan Kusen PVC type P5 Unit 5.00 1,200,000.00 6,000,000.00
2 Lantai 02
a Kusen Alumunium 4' Coathing Powder
J3 Kusen Jendela Type J3 m1 235.84 192,855.00 45,482,923.20
Kaca 5 mm m2 39.60 318,492.50 12,612,303.00
Duan Jendela Alumunium m1 127.60 210,128.00 26,812,332.80
J4 Kusen Jendela Type J4 m1 16.60 192,855.00 3,201,393.00
Kaca 5 mm m2 3.88 318,492.50 1,235,750.90
Duan Jendela Alumunium m1 6.40 210,128.00 1,344,819.20
J5 Kusen Jendela Type J5 m1 68.08 192,855.00 13,129,568.40
Kaca 5 mm m2 21.84 318,492.50 6,955,876.20
J7 Kusen Jendela Type J7 m1 34.50 192,855.00 6,653,497.50
Kaca 5 mm m2 10.08 318,492.50 3,210,404.40
b Kusen Pintu Kayu Kls I
Kusen Pintu Type P1 m3 0.03 10,836,392.50 366,270.07
Kusen Pintu Type P3 m3 0.10 10,836,392.50 1,035,417.30
Kusen Pintu Type P5 m3 0.03 10,836,392.50 324,008.14
Pengecatan Kusen m2 8.67 60,287.60 522,753.78
c Daun Pintu Panil Kayu Kls I
Daun Pintu Type P1 m2 2.71 1,256,409.50 3,402,859.49
Daun Pintu Type P3 m2 5.46 1,256,409.50 6,861,503.56
Daun Pintu Type P5 m2 1.33 1,256,409.50 1,673,537.45
Pengecatan Pintu m2 19.00 60,287.60 1,145,657.32
d Kusen Ventilasi Kayu KLs I
Kusen Ventilasi Type 2 m3 0.09 10,836,392.50 929,762.48
Kaca 5 mm Ventilasi type 2 m2 1.80 318,492.50 573,286.50
f Pek. Pintu pvc P5
Pintu dan Kusen PVC type P5 Unit 4.00 1,200,000.00 4,800,000.00
3 Lantai 03
a Kusen Alumunium 4' Coathing Powder
J3 Kusen Jendela Type J3 m1 128.64 192,855.00 24,808,867.20
Kaca 5 mm m2 21.60 318,492.50 6,879,438.00
Duan Jendela Alumunium m1 69.60 210,128.00 14,624,908.80
J7 Kusen Jendela Type J7 m1 34.50 192,855.00 6,653,497.50
Kaca 5 mm m2 10.08 318,492.50 3,210,404.40
b Kusen Pintu Kayu Kls I
Kusen Pintu Type P1 m3 0.10 10,836,392.50 1,098,810.20
Kusen Pintu Type P2 m3 0.16 10,836,392.50 1,725,695.51
Kusen Pintu Type P3 m3 0.10 10,836,392.50 1,035,417.30
Kusen Pintu Type P5 m3 0.03 10,836,392.50 324,008.14
Pengecatan Kusen m2 17.20 60,287.60 1,037,187.87
c Daun Pintu Panil Kayu Kls I
Daun Pintu Type P1 m2 8.13 1,256,409.50 10,208,578.47
Daun Pintu Type P2 m2 9.10 1,256,409.50 11,435,839.27
Daun Pintu Type P3 m2 5.46 1,256,409.50 6,861,503.56
Daun Pintu Type P5 m2 1.33 1,256,409.50 1,673,537.45
Pengecatan Pintu m2 48.04 60,287.60 2,896,264.53
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
d Kusen Ventilasi Kayu KLs I
Kusen Ventilasi Type 2 m3 0.10 10,836,392.50 1,084,722.89
Kaca 5 mm Ventilasi type 2 m2 2.10 318,492.50 668,834.25
f Pek. Pintu pvc P5
Pintu dan Kusen PVC type P5 Unit 4.00 1,200,000.00 4,800,000.00
E Pekerjaan Besi dan ACP
1 Pek. Pasangan ACP (Kanopi Teras Entrance)
Rangka Besi Hollo 60x120 M2 114.35 208,380.00 23,827,211.10
Pas. ACP M2 114.35 166,140.50 18,997,335.47
2 Pek. Pasangan ACP (Cover Kolom Entrance)
Rangka Besi Hollo M2 16.70 208,380.00 3,480,779.52
Pas. ACP M2 17.40 166,140.50 2,890,844.70
3 Pek. Pasangan ACP (Kanopi Teras Samping)
Rangka Besi Hollo 60x120 M2 33.75 208,380.00 7,032,825.00
Pas. ACP M2 33.75 166,140.50 5,607,241.88
4
Rangka Besi Hollo 60x120 M2 124.37 208,380.00 25,915,970.54
Pas. ACP M2 124.37 166,140.50 20,662,694.62
Pas. ACP + Laser Cutting M2 82.80 473,190.50 39,180,173.40
5 Pas. ACP Sisi Depan(Cover kolom & Dinding )
Cover Kolom & Topi
Rangka Besi Hollo 60x120 M2 245.04 208,380.00 51,061,435.20
Pas. ACP M2 245.04 166,140.50 40,711,068.12
Cover Dinding
Rangka Besi Hollo 60x120 M2 38.96 208,380.00 8,118,484.80
Pas. ACP M2 38.96 166,140.50 6,472,833.88
Pas. ACP + Laser Cutting M2 73.16 473,190.50 34,618,616.98
Panel Jari-jari 40.40.10 cm
Rangka Besi Hollo 60x120 M2 39.20 208,380.00 8,168,496.00
Pas. ACP M2 39.20 166,140.50 6,512,707.60
6 Pas. ACP Sisi Belakang (Cover kolom & Dinding )
Cover Kolom
Rangka Besi Hollo 60x120 M2 75.49 208,380.00 15,729,772.68
Pas. ACP M2 75.49 166,140.50 12,541,281.78
Cover Dinding
Rangka Besi Hollo 60x120 M2 133.97 208,380.00 27,915,626.70
Pas. ACP M2 133.97 166,140.50 22,257,012.08
Pas. ACP + Laser Cutting M2 35.50 473,190.50 16,798,262.75
7 Pas. ACP Sisi Kanan (Cover kolom & Dinding )
Cover Kolom
Rangka Besi Hollo 60x120 M2 137.20 208,380.00 28,589,944.38
Pas. ACP M2 137.20 166,140.50 22,794,642.74
Cover Dinding
Rangka Besi Hollo 60x120 M2 83.04 208,380.00 17,303,875.20
Pas. ACP M2 83.04 166,140.50 13,796,307.12
Pas. ACP + Laser Cutting M2 35.50 473,190.50 16,798,262.75
8 Pas. ACP Sisi Layar Depan & Belakang
Penutup Layar
Rangka Besi Hollo 60x120 M2 64.76 208,380.00 13,494,688.80
Pas. ACP M2 64.76 166,140.50 10,759,258.78
Cover Dinding Bawah Layar
Rangka Besi Hollo 60x120 M2 59.12 208,380.00 12,319,425.60
Pas. ACP M2 59.12 166,140.50 9,822,226.36
9 Pekerjaan Raillig Tangga Utama Besi Hollow M2 12.04 702,245.43 8,455,034.96
10 Pekerjaan Raillig Tangga Lt. 02 Besi Hollow M2 11.10 702,245.43 7,794,924.25
11 Pekerjaan Railling Void Lt. Mezanin Besi Hollow M2 9.90 702,245.43 6,952,229.74
12 Pekerjaan Railling Void Lt. 02 Besi Hollow M2 21.00 702,245.43 14,747,154.00
13 Pekerjaan Railling Void Lt. 03 Besi Hollow M2 18.00 702,245.43 12,640,417.71
14 Pekerjaan Railling Jalur Disabilitas Besi Hollow M2 12.98 702,245.43 9,111,634.43
15 Pek. Pas. Huruf Identitas Bangunan
Perpustakaan Daerah + Logo cm 1,511.00 8,358.34 12,629,457.41
Kabupaten Muna + logo cm 1,032.00 8,358.34 8,625,810.75
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
F Pekerjaan Atap Dan Kuda-kuda Baja
1 Pek. Rangka kuda Baja WF dan Atap (A1)
Pemasangan Angkur Besi Dia 10 mm bh 48.00 21,494.08 1,031,715.60
Plat Dudukan Kuda-kuda bh 12.00 68,931.00 827,172.00
1 set Aksesoris Perlengkapan Kuda-kuda Set 3.00 439,087.25 1,317,261.75
Pas. Rangka kuda-kuda Baja WF 175.90 kg 2,892.69 42,515.50 122,984,083.75
Pas. Gording Besi Profil C kg 1,058.13 41,986.50 44,427,315.20
Pek. Pengecatan Baja WF dan Profil C m2 221.22 43,935.75 9,719,273.30
Pas. Baut Sambungan Gording titik 85.33 42,481.00 3,625,045.33
Pas. Atap Onduline m2 408.00 163,627.75 66,760,122.00
Pas. Nok Atap m1 16.00 206,747.00 3,307,952.00
Pas. Lisplank m1 51.00 89,412.50 4,560,037.50
2 Pek. Pas. Kuda-kuda dan Atap (A2)
Pas. Rangka Baja Ringan M2 240.07 268,571.00 64,476,914.25
Pas. Atap Metal M2 120.04 127,477.50 15,302,016.67
3 Pek. Pas. Kuda-kuda dan Atap (A3)
Pas. Rangka Baja Ringan M2 44.00 268,571.00 11,817,124.00
Pas. Atap Metal M2 44.00 127,477.50 5,609,010.00
4 Pek. Pas. Kuda-kuda dan Atap (A4)
Pas. Rangka Baja Ringan M2 45.58 268,571.00 12,242,003.32
Pas. Atap Metal M2 45.58 127,477.50 5,810,679.41
G Pekerjaan Plafond dan Rangka
1 Pek. Rangka dan Plafon Lt. 01
a Entrance
Pas. Rangka balok kayu 5/7 M2 55.69 137,303.10 7,645,723.12
Pas. Plafond Kayu Papan Kls I M2 56.00 304,508.50 17,052,476.00
Pek. Pengecatan Dengan Vernis M2 55.69 58,513.15 3,258,304.76
b Entrance Sisi Dalam
Pas. Rangka Plafond Besi Hollow M2 15.60 233,085.83 3,636,139.00
Pas. Plafond Gypsum M2 15.60 67,891.40 1,059,105.84
Pek. Pengecatan M2 15.60 96,441.30 1,504,484.28
d Lavatory
Pas. Rangka balok kayu 5/7 M2 30.00 137,303.10 4,119,093.00
Pas. Plafond Kayu Papan M2 30.00 304,508.50 9,135,255.00
Pek. Pengecatan Dengan Vernis M2 30.00 58,513.15 1,755,394.50
e R. Baca
Pas. Rangka Plafond Besi Hollow M2 104.73 233,085.83 24,411,079.33
Pas. Plafond Gypsum M2 104.73 67,891.40 7,110,266.32
Pek. Pengecatan M2 104.73 96,441.30 10,100,297.35
f R. Baca/Interaksi Anak
Pas. Rangka Plafond Besi Hollow M2 84.16 233,085.83 19,617,202.99
Pas. Plafond Gypsum M2 84.16 67,891.40 5,713,943.90
Pek. Pengecatan M2 84.16 96,441.30 8,116,789.13
g Sekasar
Pas. Rangka Plafond Besi Hollow M2 45.29 233,085.83 10,556,457.39
Pas. Plafond Gypsum M2 45.29 67,891.40 3,074,801.51
Pek. Pengecatan M2 45.29 96,441.30 4,367,826.48
h Mushala
Pas. Rangka Plafond Besi Hollow M2 16.35 233,085.83 3,810,953.38
Pas. Plafond Gypsum M2 16.35 67,891.40 1,110,024.39
Pek. Pengecatan M2 16.35 96,441.30 1,576,815.26
i R. Sortir Buku dan R. Server
Pas. Rangka Plafond Besi Hollow M2 23.00 233,085.83 5,360,974.17
Pas. Plafond Gypsum M2 23.00 67,891.40 1,561,502.20
Pek. Pengecatan M2 23.00 96,441.30 2,218,149.90
j R. Baca Digital
Pas. Rangka Plafond Besi Hollow M2 55.33 233,085.83 12,896,639.16
Pas. Plafond Gypsum M2 55.33 67,891.40 3,756,431.16
Pek. Pengecatan M2 55.33 96,441.30 5,336,097.13
2 Pek. Rangka dan Plafond Lt. 02
a Lantai Mezanin
Pas. Rangka balok kayu 5/7 M2 51.88 137,303.10 7,122,598.31
Pas. Plafond Kayu Papan Kls I M2 51.88 304,508.50 15,796,378.44
Pek. Pengecatan Dengan Vernis M2 51.88 58,513.15 3,035,369.66
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
b Lavatory
Pas. Rangka balok kayu 5/7 M2 30.00 137,303.10 4,119,093.00
Pas. Plafond Lambrisering M2 30.00 304,508.50 9,135,255.00
Pek. Pengecatan Dengan Vernis M2 30.00 58,513.15 1,755,394.50
c R. Baca
Pas. Rangka Plafond Besi Hollow M2 159.81 233,085.83 37,249,447.03
Pas. Plafond Gypsum M2 159.81 67,891.40 10,849,724.63
Pek. Pengecatan M2 159.81 96,441.30 15,412,284.15
d R. Auditorium
Pas. Rangka Plafond Besi Hollow M2 101.51 233,085.83 23,661,242.20
Pas. Plafond Gypsum M2 101.51 67,891.40 6,891,859.69
Pek. Pengecatan M2 101.51 96,441.30 9,790,045.69
e Selasar hall
Pas. Rangka Plafond Besi Hollow M2 63.33 233,085.83 14,761,325.83
Pas. Plafond Gypsum M2 63.33 67,891.40 4,299,562.36
Pek. Pengecatan M2 63.33 96,441.30 6,107,627.53
3 Pek. Rangka dan Plafond Lt. 03
a Selasar hall
Pas. Rangka Plafond Besi Hollow M2 124.99 233,085.83 29,133,398.31
Pas. Plafond Gypsum M2 124.99 67,891.40 8,485,746.09
Pek. Pengecatan M2 124.99 96,441.30 12,054,198.09
b Void
Pas. Rangka balok kayu 5/7 M2 117.78 137,303.10 16,171,559.12
Pas. Plafond Gypsum M2 56.42 67,891.40 3,830,432.79
Pek. Pengecatan M2 56.42 96,441.30 5,441,218.15
Pas. Plafond Lambrisering M2 69.61 304,508.50 21,196,836.69
Pek. Pengecatan Dengan Vernis M2 69.61 58,513.15 4,073,100.37
c R. Rapat
Pas. Rangka Plafond Besi Hollow M2 50.33 233,085.83 11,731,209.99
Pas. Plafond Gypsum M2 50.33 67,891.40 3,416,974.16
Pek. Pengecatan M2 50.33 96,441.30 4,853,890.63
d R. Kadis
Pas. Rangka Plafond Besi Hollow M2 50.17 233,085.83 11,693,450.09
Pas. Plafond Gypsum M2 50.17 67,891.40 3,405,975.76
Pek. Pengecatan M2 50.17 96,441.30 4,838,267.14
e R. Sekretaris
Pas. Rangka Plafond Besi Hollow M2 25.08 233,085.83 5,846,725.04
Pas. Plafond Gypsum M2 25.08 67,891.40 1,702,987.88
Pek. Pengecatan M2 25.08 96,441.30 2,419,133.57
f R. Kabid
Pas. Rangka Plafond Besi Hollow M2 25.08 233,085.83 5,846,725.04
Pas. Plafond Gypsum M2 25.08 67,891.40 1,702,987.88
Pek. Pengecatan M2 25.08 96,441.30 2,419,133.57
g R. Bendahara & staf
Pas. Rangka Plafond Besi Hollow M2 41.76 233,085.83 9,733,664.40
Pas. Plafond Gypsum M2 41.76 67,891.40 2,835,144.86
Pek. Pengecatan M2 41.76 96,441.30 4,027,388.69
h Lavatory
Pas. Rangka balok kayu 5/7 M2 18.00 137,303.10 2,471,455.80
Pas. Plafond Kayu Papan M2 18.00 304,508.50 5,481,153.00
Pek. Pengecatan Plitur M2 18.00 58,513.15 1,053,236.70
H Pekerjaan Penutup lantai
1 Lantai 01
Teras Entrance
Pas. Granito 60x60 (warna cream) m2 37.69 348,477.60 13,134,120.74
Pas. Granit 10x60 (warna abu-abu) m2 3.54 348,477.60 1,233,610.70
Tangga Teras Entrance
Pas. Keramik 30x60 (warna Abu-abu) m2 27.80 259,352.60 7,211,039.69
Pas. Keramik 18x60 (warna abu-abu) m2 33.22 259,352.60 8,615,434.02
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
Tangga Utama
Pas. Granit 30x60 (warna Cream) m2 5.10 348,477.60 1,777,235.76
Pas. Granit 18x60 (warna cream) m2 3.06 348,477.60 1,066,341.46
Pas. Granito Bordes 60x60 (warna cream) m2 2.89 348,477.60 1,007,100.26
Ruang Lobby
Pas. Granito 60x60 (Cream) m2 56.70 348,477.60 19,758,679.92
Pas. Granit 60x60 (Hitam) m2 23.05 348,477.60 8,032,408.68
Plint 10x60 (hitam) m1 12.71 67,488.33 857,776.61
Ruang Baca
Pas. Granito 60x60 (Cream) m2 120.74 348,477.60 42,075,185.42
Plint 10x60 (Cream) m1 35.95 67,488.33 2,426,205.28
Selasar
Pas. Granito 60x60 (Cream) m2 117.19 348,477.60 40,838,089.94
Plint 10x60 (Cream) m1 49.00 67,488.33 3,306,927.93
Ruang Baca Anak
Pas. Granito 60x60 (Cream) m2 75.42 348,477.60 26,282,180.59
Plint 10x60 (Cream) m1 30.44 67,488.33 2,054,344.61
Mushalla
Pas. Granito 60x60 (Cream) m2 16.52 348,477.60 5,756,849.95
Plint 10x60 (Cream) m1 15.00 67,488.33 1,012,324.88
Ruang Sortir buku & R. server
Pas. Granito 60x60 (Cream) m2 23.32 348,477.60 8,126,497.63
Plint 10x60 (Cream) m1 20.00 67,488.33 1,349,766.50
Lavatory
Lav. Pria
Pas. Keramik Lantai 20x20 (Putih) m2 14.62 259,636.65 3,795,887.82
Pas. Keramik dinding 20x20 (Putih) m2 33.75 306,895.90 10,356,202.15
Lav. Wanita
Pas. Keramik Lantai 20x20 (Putih) m2 14.82 259,636.65 3,847,815.15
Pas. Keramik dinding 20x20 (Putih) m2 33.75 306,895.90 10,356,202.15
2 Lantai 02
Hall
Pas. Granito 60x60 (Cream) m2 64.89 348,477.60 22,612,711.46
Plint 10x60 (Cream) m1 17.80 67,488.33 1,201,292.19
Auditorium
Pas. Granito 60x60 (Cream) m2 97.34 348,477.60 33,920,809.58
Plint 10x60 (Cream) m1 40.00 67,488.33 2,699,533.00
R. Baca
Pas. Granito 60x60 (Cream) m2 155.82 348,477.60 54,299,779.63
Plint 10x60 (Cream) m1 45.00 67,488.33 3,036,974.63
R. baca LT. Mezanin
Pas. Granito 60x60 (Cream) m2 70.00 348,477.60 24,393,432.00
Plint 10x60 (Cream) m1 25.00 67,488.33 1,687,208.13
Tangga Ke-LT. 03
Pas. Granit 30x60 (warna Cream) m2 2.40 348,477.60 836,346.24
Pas. Granit 18x60 (warna cream) m2 1.62 348,477.60 564,533.71
Pas. Granito Bordes 60x60 (warna cream) m2 2.26 348,477.60 787,559.38
Tangga ke Lantai mezanin
Pas. Granit 30x60 (warna Cream) m2 2.25 348,477.60 784,074.60
Pas. Granit 18x60 (warna cream) m2 1.62 348,477.60 564,533.71
Lavatory
Lav. Pria
Pas. Keramik Lantai 20x20 m2 14.34 259,636.65 3,723,189.56
Pas. Keramik dinding 20x20 m2 33.75 306,895.90 10,356,202.15
Lav. Wanita
Pas. Keramik Lantai 20x20 m2 14.82 259,636.65 3,847,815.15
Pas. Keramik dinding 20x20 m2 33.75 306,895.90 10,356,202.15
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
3 Lantai 03
Hall dan selasar
Pas. Granito 60x60 (Cream) m2 117.69 348,477.60 41,012,328.74
Plint 10x60 (Cream) m1 72.00 67,488.33 4,859,159.40
R. Rapat
Pas. Granito 60x60 (Cream) m2 48.11 348,477.60 16,765,257.34
Plint 10x60 (Cream) m1 38.80 67,488.33 2,618,547.01
R. Kadis
Pas. Granito 60x60 (Cream) m2 47.28 348,477.60 16,476,020.93
Plint 10x60 (Cream) m1 48.50 67,488.33 3,273,183.76
R. Sekretaris
Pas. Granito 60x60 (Cream) m2 23.64 348,477.60 8,238,010.46
Plint 10x60 (Cream) m1 18.00 67,488.33 1,214,789.85
R. Kabid
Pas. Granito 60x60 (Cream) m2 23.64 348,477.60 8,238,010.46
Plint 10x60 (Cream) m1 18.20 67,488.33 1,228,287.52
R. Bendahara
Pas. Granito 60x60 (Cream) m2 13.92 348,477.60 4,850,808.19
Plint 10x60 (Cream) m1 14.00 67,488.33 944,836.55
R. Staf
Pas. Granito 60x60 (Cream) m2 27.84 348,477.60 9,701,616.38
Plint 10x60 (Cream) m1 28.00 67,488.33 1,889,673.10
Lavatory
Lav. Pria
Pas. Keramik Lantai 20x20 m2 1.00 259,636.65 259,636.65
Pas. Keramik dinding 20x20 m2 1.00 306,895.90 306,895.90
Lav. Wanita
Pas. Keramik Lantai 20x20 m2 1.00 259,636.65 259,636.65
Pas. Keramik dinding 20x20 m2 1.00 306,895.90 306,895.90
Balkon
Pas. Keramik Lantai 20x20 m2 5.60 259,636.65 1,453,965.24
I Pekerjaan Sanitasi
1 Lantai 01 (Lavatory)
Pas. Closed Duduk bh 4.00 6,377,785.00 25,511,140.00
Pas. Urinoir bh 3.00 3,620,246.00 10,860,738.00
Pas. Wastafel bh 4.00 1,093,121.00 4,372,484.00
Pas. krain Air1 1/2" bh 12.00 152,605.00 1,831,260.00
2 Lantai 02 (Lavatory)
Pas. Closed Duduk bh 4.00 6,377,785.00 25,511,140.00
Pas. Urinoir bh 3.00 3,620,246.00 10,860,738.00
Pas. Wastafel bh 4.00 1,093,121.00 4,372,484.00
Pas. krain Air1 1/2" bh 12.00 152,605.00 1,831,260.00
3 Lantai 03 (Lavatory)
Pas. Closed Duduk bh 4.00 6,377,785.00 25,511,140.00
Pas. Urinoir bh 3.00 3,620,246.00 10,860,738.00
Pas. Wastafel bh 4.00 1,093,121.00 4,372,484.00
Pas. krain Air1 1/2" bh 12.00 152,605.00 1,831,260.00
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
II. PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI DAN BETON
1 Tiang Pancang Mini Pile Mutu Beton K-450 Uk 30.30
Mobilisasi & Demobilisasi Peralatan Pancang Ls 1.00 20,000,000.00 20,000,000.00
Pengadaan Tiang Pancang Uk. 30.30 Panjang 4 m (tiba di site) m' 1,415.91 829,500.00 1,174,497,345.00
Handling tiang pancang di site btg 327.00 100,000.00 32,700,000.00
Pemancangan Tiang m' 1,415.91 148,915.47 210,850,898.17
Penyambungan Tiang titik 238.00 50,000.00 11,900,000.00
Potong Kepala Tiang titik 119.00 50,000.00 5,950,000.00
2 PEKERJAAN FOOT PLAT
Pondasi Foot Plat Tipe P1 ( 9 titik)
Galian Tanah m3 10.58 99,187.50 1,049,800.50
Urugan Pasir Bawah Foot Plat, t= 10 cm m3 0.88 259,785.00 229,130.37
Lantai Kerja, Beton K.100, t = 5 cm m3 1.76 1,189,230.03 2,097,801.78
Beton K-300 m3 10.06 1,477,996.46 14,874,925.83
Besi Beton, U - 42 Kg 1,775.55 34,165.35 60,662,382.72
Bekesting m2 44.28 102,028.00 4,517,799.84
Poor Pondasi Tipe P2 ( 17 titik)
Galian Tanah m3 17.14 99,187.50 1,699,677.00
Urugan Pasir Bawah Foot Plat, t= 10 cm m3 1.43 259,785.00 370,972.98
Lantai Kerja, Beton K.100, t = 5 cm m3 2.86 1,189,230.03 3,396,440.97
Beton K-300 m3 16.87 1,477,996.46 24,931,213.72
Besi Beton, U - 42 Kg 2,995.98 34,165.35 102,358,783.33
Bekesting m2 78.29 102,028.00 7,987,261.98
Poor Pondasi Tipe P3 ( 9 titik)
Galian Tanah m3 14.17 99,187.50 1,405,288.50
Urugan Pasir Bawah Foot Plat, t= 10 cm m3 0.62 259,785.00 160,027.56
Lantai Kerja, Beton K.100, t = 5 cm m3 1.23 1,189,230.03 1,465,131.40
Beton K-300 m3 8.14 1,477,996.46 12,034,955.64
Besi Beton, U - 42 Kg 1,476.24 34,165.35 50,436,144.90
Bekesting m2 48.18 102,028.00 4,915,709.04
B PEKERJAAN STRUKTUR LT. 01
1 PEKERJAAN SLOEF
Pek. Sloef Beton 25/40
Pek. Beton K.275 M3 24.72 1,466,687.99 36,250,660.25
Besi Beton, U - 42 Kg 5,224.40 34,165.35 178,493,546.57
Bekesting Sloef m2 197.73 106,699.88 21,097,552.88
Pek. Sloef Beton 15/20
Pek. Beton K.275 M3 1.53 1,466,687.99 2,240,072.56
Besi Beton, U - 42 Kg 299.40 18,467.85 5,529,211.85
Bekesting Sloef m2 10.38 106,699.88 1,107,758.10
2 PEKERJAAN KOLOM
Pek. Kolom K1 Lt. 01 Uk 45.45 (1 Titik)
Pek. Beton K.300 M3 1.00 1,477,996.46 1,477,996.46
Besi Beton, U - 42 Kg 149.92 18,467.85 2,768,645.35
Bekesting Kolom m2 7.20 380,644.25 2,740,638.60
3 Pek. Kolom K2 Lt. 01 Uk 50.40(35 Titik)
Pek. Beton K.300 M3 27.60 1,477,996.46 40,792,702.18
Besi Beton, U - 42 Kg 4,137.71 18,467.85 76,414,611.73
Bekesting Kolom m2 241.28 380,644.25 91,839,941.42
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
4 Pek. Kolom K3 Lt. 01 Uk 20.20 (Entrance, tangga lt.01)
Pek. Beton K.300 M3 0.18 1,477,996.46 260,127.38
Besi Beton, U - 42 Kg 136.85 18,467.85 2,527,300.16
Bekesting Kolom m2 3.52 380,644.25 1,339,867.76
5 Pek. Kolom Praktis m1 133.20 187,809.61 25,016,239.39
6 Pekerjaan Ring Balok 10X15 m1 11.62 193,553.05 2,249,086.44
7 Pekerjaan Tangga
Tangga Utama (LT.01)
Beton K 275 M3 2.08 1,466,687.99 3,044,621.32
Besi Kg 311.38 18,467.85 5,750,467.42
Bekesting Tangga m2 17.38 361,669.25 6,286,679.57
8 Pekerjaan Tangga
Tangga Entrance (LT.01)
Beton K 275 M3 5.57 1,466,687.99 8,169,452.08
Besi Kg 557.00 18,467.85 10,286,592.45
Bekesting Tangga M3 72.60 180,834.63 13,128,593.78
9 Pek. Ram Jalur Disabilitas
Rabat Beton K 100 M3 2.67 1,189,230.03 3,176,136.11
C PEKERJAAN STRUKTUR LT. 02
1 Pek. Balok B2 Lt. 02 Uk 25.40 (Elev. 4.00)
Pek. Beton K.275 M3 20.60 1,466,687.99 30,213,772.51
Besi Beton, U - 42 Kg 3,444.18 34,165.35 117,671,706.27
Bekesting Balok M2 166.86 386,250.50 64,449,758.43
2 Pek. Balok B1 Lt. Mezanin Uk 25.50 (Elev. 5.00)
Pek. Beton K.275 M3 2.81 1,466,687.99 4,115,893.16
Besi Beton, U - 42 Kg 469.19 34,165.35 16,029,913.87
Bekesting Balok M2 22.67 386,250.50 8,758,036.96
3 Pek. Balok BA1 Lt. 02 Uk 20.30 (Elev. 4.00)
Pek. Beton K.275 M3 4.97 1,466,687.99 7,286,505.91
Besi Beton, U - 42 Kg 993.60 34,165.35 33,946,691.76
Bekesting Balok M2 46.37 386,250.50 17,909,663.18
4 Pek. Balok BA1 Lt. Mezanin Uk 20.30 (Elev. 5.00)
Pek. Beton K.275 M3 4.65 1,466,687.99 6,821,859.16
Besi Beton, U - 42 Kg 930.24 34,165.35 31,781,975.18
Bekesting Balok M2 24.82 386,250.50 9,586,428.41
5 Pek. Balok Latei 8x45 ( Lt. Mezanin dan Void)
Pek. Beton K.275 M3 1.83 1,466,687.99 2,676,998.91
Besi Beton Polos Kg 182.52 34,165.35 6,235,859.68
Bekesting Balok M2 3.65 386,250.50 1,409,968.83
6 Pek. Plat Beton Lantai. 02 (ELV +4.00 dan 5.00)
Beton K 275 + Bondek+ Wiremesh M3 34.61 4,338,867.20 150,175,135.98
7 Pek. Kolom K1 Lt. 02 Uk 45.45 cm (1 titik)
Pek. Beton K.300 M3 0.68 1,477,996.46 1,011,614.67
Besi Beton, U - 42 Kg 102.61 34,165.35 3,505,731.03
Bekesting Kolom M2 6.08 380,644.25 2,315,839.62
8 Pek. Kolom K2 Lt. 02 Uk 50.40 cm (34 Titik)
Pek. Beton K.300 M3 22.98 1,477,996.46 33,970,270.54
Besi Beton, U - 42 Kg 3,445.69 34,165.35 117,723,313.46
Bekesting Kolom M2 199.73 380,644.25 76,026,456.70
9 Pek. Kolom Praktis 10.10
Lantai 02 m1 114.70 187,809.61 21,541,761.69
10 Pekerjaan Tangga
Tangga dari LT.02 ke LT. 03
Beton K 275 M3 1.11 1,466,687.99 1,625,090.29
Besi Kg 121.88 18,467.85 2,250,861.56
Bekesting Tangga M2 10.30 361,669.25 3,725,193.28
HARGA JUMLAH
No. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
D PEKERJAAN STRUKTUR LT. 03
1 Pek. Balok B2 Lt. 03 Uk 25.40 (Elev. 7.50)
Beton K 275 M3 20.07 1,466,687.99 29,436,427.87
Besi Beton, U - 42 Kg 3,355.57 34,165.35 114,644,230.33
Bekesting Balok M2 162.57 386,250.50 62,791,585.03
2 Pek. Balok B1 Lt. Mezanin Uk 25.50 (Elev. 10.00)
Beton K 275 M3 1.63 1,466,687.99 2,383,367.98
Besi Beton, U - 42 Kg 358.25 34,165.35 12,239,704.10
Bekesting Balok M2 13.13 386,250.50 5,071,469.07
3 Pek. Balok B2 Lt. Mezanin Uk 25.40 (Elev. 10.00)
Beton K 275 M3 2.03 1,466,687.99 2,970,043.17
Besi Beton, U - 42 Kg 446.43 34,165.35 15,252,554.34
Bekesting Balok M2 14.38 386,250.50 5,553,316.56
4 Pek. Balok B3 Lt. Mezanin Uk 25.35 (Elev. 10.00)
Beton K 275 M3 0.80 1,466,687.99 1,167,850.31
Besi Beton, U - 42 Kg 175.54 34,165.35 5,997,455.01
Bekesting Balok M2 6.46 386,250.50 2,495,564.48
5 Pek. Balok BA1 Lt. 03 Uk 20.30 (Elev. 7.50 & 10.00)
Beton K 275 M3 6.91 1,466,687.99 10,139,507.38
Besi Beton, U - 42 Kg 1,524.09 34,165.35 52,071,090.69
Bekesting Balok M2 64.52 386,250.50 24,922,118.26
6 Pek. Balok Latei 8x45 ( Lt. Mezanin dan Void)
Beton K 275 M3 1.03 1,466,687.99 1,515,382.03
Besi Beton Polos Kg 103.32 34,165.35 3,529,963.96
Bekesting Balok M2 2.07 386,250.50 798,148.03
7 Pek. Plat Beton Lantai. 03
Beton K 275 + Bondek+ Wiremesh M3 32.03 4,338,867.20 138,976,519.74
8 Pek. Kolom K1 Lt. 03 Uk 45.45 (1 Titik)
Pek. Beton K.300 M3 0.68 1,477,996.46 1,011,614.67
Besi Beton, U - 42 Kg 102.61 34,165.35 3,505,731.03
Bekesting Kolom M2 6.08 380,644.25 2,315,839.62
9 Pek. Kolom K2 Lt. 03 Uk 50.40 (32 Titik)
Pek. Beton K.300 M3 17.04 1,477,996.46 25,177,965.23
Besi Beton, U - 42 Kg 2,553.87 34,165.35 87,253,749.98
Bekesting Kolom M2 165.81 380,644.25 63,113,100.52
10 Pek. Kolom Praktis 10.10
Lantai 03 m1 122.85 187,809.61 23,072,409.97
E PEKERJAAN STRUKTUR LT. TOP FLOOR
BALOK Elev +11,00
1 Pek. Balok B3 Uk 25.35 (Elev. 11.00)
Beton K 275 M3 24.03 1,466,687.99 35,245,978.98
Besi Beton, U - 42 Kg 4,017.82 34,165.35 137,270,328.81
Bekesting Balok M2 194.99 386,250.50 75,316,684.50
2 Pek. Balok BA1 Uk 25.30 (Elev. 11.00)
Beton K 275 M3 4.33 1,466,687.99 6,356,992.40
Besi Beton, U - 42 Kg 724.66 34,165.35 24,758,184.12
Bekesting Balok M2 35.25 386,250.50 13,616,064.00
3 Pek. Plat Beton Deck Atap
Beton K 275 + Bondek+ Wiremesh M3 4.40 4,338,867.20 19,091,102.46
4 Pek. Plat Beton Elv + 11.00 (Talang Air Hujan)
Beton K 275 M3 2.58 1,466,687.99 3,784,055.00
Besi Kg 154.80 18,467.85 2,858,823.18
Bekesting Plat M2 42.00 199,450.25 8,376,910.50
5 Pek. Plat Beton Elv + 10.00 (Talang Air Hujan Lt. Mezanin)
Beton K 275 M3 1.49 1,466,687.99 2,188,327.81
Besi Kg 164.12 18,467.85 3,030,984.17
Bekesting Plat M3 15.10 199,450.25 3,012,576.36
6 Pek. Kolom Praktis 10.10
Lantai TOP m1 25.00 187,809.61 4,695,240.13
TOTAL PEKERJAAN STRUKTUR (II) 4,102,255,455.86
HASIL PERKIRAAN SENDIRI [HPS]
PEKERJAAN : PEMBANGUNAN GEDUNG FASILITAS LAYANAN PERPUSTAKAAN (DAK)
UNIT PEKERJAAN : ME
LOKASI : KABUPATEN MUNA
TAHUN : 2022
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)
IV PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING GEDUNG
A PEKERJAAN LISTRIK ARUS MENENGAH
Pengadaan dan pemasangan lengkap sesuai dengan
Gambar dan Spesifikasi Teknis
A.1 Pekerjaan Panel-panel (PP)
A.1.1 Ruang Panel Utama
1 Panel LVMDP unit 1 132,128,100 132,128,100
2 Kapasitor Bank 600 KVAR / 415 V unit 1 44,714,300 44,714,300
3 PKG (Panel Kontrol Genset) unit 1 4,000,000 4,000,000
4 PP-AC unit 1 5,565,138 5,565,138
5 PP-STP unit 1 4,047,138 4,047,138
6 PP-SDP unit 1 5,565,138 5,565,138
A.1.2 Lantai 01
1 PP-SDP unit 1 7,953,400 7,953,400
2 PP-STP unit 1 7,953,400 7,953,400
3 PP- 1 unit 1 7,953,400 7,953,400
A.1.3 Lantai 02
1 PP- SDP unit 1 8,286,900 8,286,900
2 PP. AC unit 1 9,206,900 9,206,900
3 PP- SK unit 1 8,286,900 8,286,900
A.1.4 Lantai 03
1 PP- 1 unit 1 7,953,400 7,953,400
2 PP.AC-1 unit 1 8,637,650 8,637,650
3 SDP-1 unit 1 8,350,150 8,350,150
A.1.5 Lantai Atap
1 PP-OBS ( Obstruction) unit 1 9,000,000 9,000,000
2 PP-Booster Pump unit 1 4,000,000 4,000,000
A.1.6 Pekerjaan Kabel-Kabel Utama
1.6.1 Kabel dari LVMDP ke
1 SDP 1 NYY 2 ( 4 x 1 x 120 ) mm2 m' 5 3,880,445 19,402,225
2 PP- AC NYY 4 x 16 mm2 m' 5 171,465 857,325
3 PP – Booster PumNYY 4 x 4 mm2 m' 5 42,895 214,475
4 PP – PressuruzedFRC 4 x 1 x 6 mm2 m' 5 365,930 1,829,650
1.6.2 Kabel dari SDP -1 ke PP LT.01
1 PP - 1 NYY 4 x 6 mm2 m' 12 54,395 652,740
2 PP -P1 NYA2 4 x 25 mm2 m' 539 26,795 14,442,505
3 PP-SK 1 NYA2 4 x 16 mm2 m' 355 43,470 15,431,850
4 PP-2 NYY 4 x 70 mm2 m' 12 745,545 8,946,540
1.6.3 Kabel dari SDP -2 ke PP LT.02
1 PP - 2 NYY 4 x 6 mm2 m' 24 54,395 1,305,480
2 PP -P2 NYA2 4 x 25 mm2 m' 210.6 26,795 5,643,295
3 PP-SK2 NYA2 4 x 16 mm2 m' 160 43,470 6,955,200
4 PP-2 NYY 4 x 70 mm2 m' 24 745,545 17,893,080
5 PP- 3 NYY 4 x 70 mm2 m' 24 745,545 17,893,080
6 PP-AC NYA2 4 x 16 mm2 m' 75 43,470 3,260,250
1.6.4 Kabel dari SDP -3 ke PP LT.03
1 PP - 2 NYY 4 x 6 mm2 m' 36 54,395 1,958,220
2 PP -P2 NYA2 4 x 25 mm2 m' 377 26,795 10,101,715
3 PP-SK2 NYA2 4 x 16 mm2 m' 165 43,470 7,172,550
4 PP-2 NYY 4 x 70 mm2 m' 36 745,545 26,839,620
5 PP- 3 NYY 4 x 70 mm2 m' 36 745,545 26,839,620
6 PP-AC NYA2 4 x 16 mm2 m' 111 43,470 4,825,170
A.1.7 Kabel Tray Arus Kuat
Termasuk accessories dan material bantu
1.7.1 Lantai 01
1 - uk. 600 mm x 100 mm m' 4 155,825 623,300
2 - uk. 200 mm x 100 mm m' 40 235,070 9,402,783
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)
1.7.2 Lantai 02
1 - uk. 600 mm x 100 mm m' 8 155,825 1,246,600
2 - uk. 200 mm x 100 mm m' 40 235,070 9,402,783
1.7.3 Lantai 03
1 - uk. 600 mm x 100 mm m' 11 155,825 1,714,075
2 - uk. 200 mm x 100 mm m' 42 235,070 9,872,923
A.1.8 Pekerjaan Pentanahan
1 kabel Grounding BCC 6 mm² m 10 18,000 180,000
2 BCC 10 mm² m 10 21,000 210,000
3 BCC 16 mm² m 10 35,000 350,000
4 BCC 50 mm² m 10 110,000 1,100,000
5 BCC 120 mm²
Pentanahan copper clad rod 1" x 12 m lengkap bak kontrol dan CU m 10 350,000 3,500,000
6 Bar unit 1 1,500,000 1,500,000
ukuran 40 x 40
Pentanahan x 40 cm
copper claddan
rodtahanan tanah
1" x 12 m dibawah
lengkap bak 2kontrol
ohm dan CU
7 Bar unit 1 1,500,000 1,500,000
ukuran 40 x 40 x 40 cm dan tahanan tanah dibawah 1 ohm
A.1.9 Pekerjaan Lampu / Titik Nyala / Stop Kontak
1.9.1 Lantai 01
1 Lampu TL 2 x 18 watt bh 27 376,890 10,176,017
2 Lampu Down Light PLC 1 x 18 watt bh 40 273,390 10,935,580
3 Stop kontak 1P / 16 A 220 Volt bh 20 49,680 993,600
4 Saklar Tunggal bh 5 50,083 250,413
5 Saklar Ganda bh 30 53,705 1,611,150
6 Grid Switch 8 Gang bh 1 200,000 200,000
Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit
ttk 67 493,695 33,077,565
PVC HI 20 mm
7
Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI
ttk 20 493,695 9,873,900
8 20 mm
A.1.10 Lantai 02
1 Lampu TL 2 x 18 watt bh 22 376,890 8,291,569
2 Lampu Down Light PLC 1 x 18 watt bh 23 273,390 6,287,959
3 Stop kontak 1P / 16 A 220 Volt bh 7 49,680 347,760
4 Stop kontak 1P / 16 A 220 Volt AC bh 2 49,680 99,360
5 Saklar Tunggal bh 4 50,083 200,330
6 Saklar Ganda bh 20 50,083 1,001,650
7 Grid Switch 8 Gang bh 1 200,000 200,000
Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit
8 ttk 45 493,695 22,216,275
PVC HI 20 mm
9 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI ttk 7 493,695 3,455,865
20 mm
10 Titik nyala Stop kontak AC NYM 4 x 2,5 mm² didalam conduit PVC ttk 2 493,695 987,390
HI 20 mm AC
A.1.11 Lantai 03
1 Lampu TL 2 x 18 watt bh 27 376,890 10,176,017
2 Lampu Down Light PLC 1 x 18 watt bh 43 273,390 11,755,749
3 Stop kontak 1P / 16 A 220 Volt bh 11 49,680 546,480
4 Stop kontak 1P / 16 A 220 Volt AC bh 4 49,680 198,720
5 Saklar Tunggal bh 7 50,083 350,578
6 Saklar Ganda bh 34 50,083 1,702,805
7 Grid Switch 8 Gang bh 1 200,000 200,000
8 Titik nyala lampu dengan kabel NYM 3 x 2,5 mm² di dalam conduit ttk 70 493,695 34,558,650
PVC HI 20 mm
9 Titik nyala Stop kontak NYM 3 x 2,5 mm² didalam conduit PVC HI ttk 11 493,695 5,430,645
20 mm
10 Titik nyala Stop kontak AC NYM 4 x 2,5 mm² didalam conduit PVC ttk 4 493,695 1,974,780
HI 20 mm AC
A.1.12 Testing & Commissioning
9 Power Supply lengkap dengan surge arrester & UPS kap 1 kW unit 1 5,000,000 5,000,000
10 Main Distibution Frame (MDF) Sound System unit 1 3,000,000 3,000,000
11 Instalasi pengkabelan peralatan utama (ruang kontrol) lot 1 1,000,000 1,000,000
D.2 Pengkabelan Utama
1 Kabel di dalam conduit PVC HI dia 20 mm dari MDF ke:
- NYMHY 3 x 1.5m - TB. SS . 1 m' 167 18,975 3,168,825
- NYMHY 3 x 1.5m - TB. SS . 2 m' 258 18,975 4,895,550
- NYMHY 3 x 1.5m - TB. SS . 3 m' 111 18,975 2,106,225
D.3 Pekerjaan Instalasi Sound System Pada Bangunan
3.1 Lantai 01
1 Terminal Box Sound System Lt. 1 (TB. SS. 1) bh 9 361,675 3,255,075
2 Ceiling speaker 3 watt bh 9 265,363 2,388,263
3 Box Speaker 6 Watt bh 1 1,181,050 1,181,050
4 Horn Speaker 15 Watt bh 1 4,370,000 4,370,000
5 Atenuator / Volume Kontrol bh 9 178,750 1,608,750
Instalasi untuk Box Speaker & Horn Speaker dengan kabel NYMHY
6 3 x 1.5 mm2 ttk 9 327,725 2,949,526
dalam conduit PVC HI dia. 20 mm
HARGA JUMLAH
NO. URAIAN PEKERJAAN SAT VOL
SATUAN (Rp) HARGA (RP)
7 Instalasi untuk Box Speaker dengan kabel FRC 2 x1x 1.5 mm2 ttk 9 327,725 2,949,526
dalam conduit PVC HI dia. 20 mm
3.2 Lantai 02
1 Terminal Box Sound System Lt. 02 (TB. SS. M) bh 7 361,675 2,531,725
2 Ceiling speaker 3 watt bh 7 265,363 1,857,538
3 Box Speaker 6 Watt bh 1 1,181,050 1,181,050
4 Horn Speaker 15 Watt bh 1 4,370,000 4,370,000
5 Atenuator / Volume Kontrol bh 7 178,750 1,251,250
Instalasi untuk Box Speaker & Horn Speaker dengan kabel NYMHY
6 3 x 1.5 mm2 ttk 9 327,725 2,949,526
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Box Speaker dengan kabel FRC 2 x1x 1.5 mm2 ttk 10 327,725 3,277,251
dalam conduit PVC HI dia. 20 mm
3.3 Lantai 03
1 Terminal Box Sound System Lt. 3 (TB. SS. 2) bh 13 361,675 4,701,775
2 Ceiling speaker 3 watt bh 13 265,363 3,449,713
3 Box Speaker 6 Watt bh 1 1,181,050 1,181,050
4 Horn Speaker 15 Watt bh 1 4,370,000 4,370,000
5 Atenuator / Volume Kontrol bh 13 178,750 2,323,750
Instalasi untuk Cealing Speaker & Horn Speaker dengan kabel
6 NYMHY 3 x 1.5 mm2 ttk 13 327,725 4,260,426
dalam conduit PVC HI dia. 20 mm
7 Instalasi untuk Box Speaker dengan kabel FRC 2 x1x 1.5 mm2 ttk 13 327,725 4,260,426
dalam conduit PVC HI dia. 20 mm
D.4 Testing & Commissioning
1 Testing & Commissioning peralatan dan instalasi sound system lot 1 2,000,000 2,000,000
TOTAL D. PEKERJAAN SOUND SYSTEM 123,494,268
E PEKERJAAN CCTV
Pengadaan dan pemasangan sistem sesuai dengan
Gambar & Spesifikasi Teknis
E.1 Peralatan Utama dan Kabel Utama (R.Kontrol)
1 Digital Multi Plexer 16 chanel set 1 3,335,000 3,335,000
2 Monitor LCD 21" unit 1 2,200,000 2,200,000
3 CD Recorder unit 1 2,288,000 2,288,000
4 Video Metric Switch Processor unit 1 3,300,000 3,300,000
5 Power Supply lengkap dengan surge arrester unit 1 2,000,000 2,000,000
6 UPS 1 KVA 30 menit unit 1 8,000,000 8,000,000
7 Instalasi pengkabelan peralatan utama lot 1 2,500,000 2,500,000
E.2 Pekerjaan Instalasi CCTV pada Bangunan
2.1 Lantai 01
1 Indoor Dome Camera colour lensa + power supply unit 1 2,543,750 2,543,750
2 Indoor Fix Camera colour lensa 1/3" + power supply Unit 3 1,650,000 4,950,000
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
V. PEKERJAAN PLAMBING
A. Peralatan Utama Air Bersih, Air Kotor, Bekas, Vent & Air Hujan
Pengadaan & pemasangan peralatan Utama Air Bersih, Air Kotor,
Bekas, Vent & Air Hujan, lengkap terpasang dengan alat bantu &
accessories yang diperlukan sesuai dengan gambar perencanaan dan
spesifikasi teknis,
Pengadaan dan pemasangan Air Kotor dan bekas bahan pipa PVC
Class AW,dan Vent bahan pipa PVC Class D, lengkap terpasang
dengan alat bantu dan accessories lain yang diperlukan sesuai gambar
perencanaan dan spesifikasi teknis.
Pengadaan dan pemasangan Air Kotor dan bekas bahan pipa PVC
Class AW, lengkap terpasang dengan alat bantu dan accessories lain
yang diperlukan sesuai gambar perencanaan dan spesifikasi teknis.
HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN (Rp) HARGA (RP)
I. PEKERJAAN SEPTICTANK
1 Pek. Galian Tanah
Galian Septictank M3 14.56 121,612.50 1,770,784.41
Galian Resapan M3 6.64 121,612.50 807,780.63
Galian Pipa Penghubung M3 0.64 121,612.50 78,367.10
2 Pek. Pasir Urug dasar Galian dan Resapan M3 0.34 259,785.00 87,969.70
3 Pek. Urugan Kembali Bekas Galian M3 0.82 71,875.00 58,995.00
4 Pek. Beton
Plat dasar
Lantai Kerja M3 0.68 1,189,230.03 805,406.04
Beton Bertulang (150 kg besi+Bekesting) M3 1.02 7,531,824.95 7,651,392.67
Plat Dinding
Dinding Beton Bertulang (150 kg besi+Bekesting) M3 3.47 10,192,367.20 35,328,018.76
Plat Beton Atas/Penutup
Beton K 275 M3 1.02 1,466,687.99 1,489,971.66
Besi kg 111.75 18,467.85 2,063,712.98
Bekesting m2 6.77 398,900.50 2,701,553.64
5 Pas. Batu Bata 1 : 4 M2 15.05 166,140.50 2,500,414.53
6 Pek. Plesteran Dinding resapan 1:2 M2 15.05 92,882.46 1,397,881.08
7 Urugan Kerikil M3 1.13 198,559.00 223,605.23
8 Lapisan Ijuk M2 18.77 200,962.50 3,771,865.16
9 Pas. Pipa PVC 6" M1 5.00 459,190.93 2,295,954.64
II. PEKERJAAN PELATARAN & LANDSCAPE
A. Pek. Pas. Pavingblock (halaman Entrance)
1 Pek. Pas. Paving Block Pres Mesin M2 80.83 326,318.25 26,376,304.15
2 Pek. Pasir urug Bawah Paving Block M3 4.04 259,785.00 1,049,921.08
3 Pek. Canstine Beton Mutu K 100 M3 2.34 1,189,230.03 2,780,419.82
B. Pek. Pas. Paving Block (Akses,parkir dan Pelataran)
1 Pek. Pas. Paving Block Pres Mesin M2 392.00 326,318.25 127,916,754.00
2 Pek. Pasir urug Bawah Paving Block M3 19.60 259,785.00 5,091,786.00
3 Pek. Canstine Beton Mutu K 100 M3 6.05 1,189,230.03 7,194,841.69
C Pek. Rabat Keliling Bangunan K 100 M3 18.45 1,189,230.03 21,941,294.09
D Pek. Saluran Kelliling Bangunan
1 Pek. Galian Tanah Saluran M3 20.90 131,726.75 2,752,562.17
2 Pek. Pasir urug Dasar Saluran M3 2.61 259,785.00 678,558.42
3 Pek. Pas. Bata Saluran 1:4 M2 117.54 166,140.50 19,528,154.37
4 Pek. Plesteran Saluran 1:3 M2 117.54 88,852.04 10,443,668.31
5 Pek. Acian Saluran M2 117.54 29,359.50 3,450,915.63
E Pek. Pot Bunga
1 Pek. Galian Tanah m3 1.98 131,726.75 260,818.97
2 Urugan Tanah Humus dalam pot m3 14.41 178,135.00 2,567,709.14
3 Pek. Pasir urug m3 0.33 259,785.00 85,729.05
4 Pek. Pas. Bata 1:4 M2 18.48 166,140.50 3,070,276.44
5 Pek. Plesteran 1:3 M2 37.09 88,852.04 3,295,522.02
6 Pek. Acian M2 18.61 29,359.50 546,380.30
RB ANAK 1 WF 200.100.0,6
RB ANAK 2
JOIN PLAT KLOM KE PONDASI BASEPLATE 500.300.12 mm
PLAT TUTUP ATAS KOLOM BASEPLATE 400.200.12 mm
JOIN PLAT KOLOM KE BALOK INDUK BASEPLATE 400.200.12 mm
JOIN PLAT BALOK ANAK KE BALOK IND BASEPLATE 200.100.12 mm
JOIN PLAT KOLOM KE RB INDUK BASEPLATE 400.200.12 mm
JOIN PLAT RB ANAK KE INDUK BASEPLATE 200.100.12 mm
ANGKUR KOLOM KE PONDASI M20 L=350 mm
HTB KOLOM KE BALOK M16 L=50 mm
HTB KOLOM KE RB M16 L=50 mm
HTB BALOK ANAK KE INDUK M16 L=50 mm
HTB RB ANAK KE INDUK M16 L=50 mm
BONDEK
BESI BETON
BANGUNAN B
BAJA P
WF 300 KOLOM 7
KOLOM 3
GORDING 9
8
cat wf 300 19
cat wf 250 20.9833333333333 37.0833333333
cat wf 200 6.58333333333333 4.70833333333
7
No Diameter
mm
1 4.0
2 5.0
3 5.5
4 5.7
5 6.0
6 6.5
7 8.0
8 9.0
9 10.0
10 11.0
DAFTAR
NO.
1 100 x
2 125 x
3 148 x
4 150 x
5 175 x
6 198 x
7 200 x
8 248 x
9 250 x
10 298 x
11 300 x
12 346 x
13 350 x
14 396 x
15 400 x
16 446 x
17 450 x
18 500 x
19 588 x
20 600 x
21 700 x
22 800 x
23 900 x
DAFTAR B
NO. U
1 25 x
2 30 x
3 40 x
4 40 x
5 50 x
6 50 x
7 60 x
8 60 x
9 65 x
10 70 x
11 75 x
12 75 x
13 80 x
14 90 x
15 100 x
16 100 x
17 120 x
18 120 x
19 125 x
20 130 x
21 130 x
Wiremesh M7 - -
Wiremesh M8 - -
Wiremesh M9 - -
Wiremesh M10 - -
Wiremesh M12 - -
No Nama Kisaran
Harga
1 Bondek Galvanis Lebar IDR
1000mm Tebal 0,65mm 105.000 /m
2 Bondek Galvanis Lebar IDR
1000mm Tebal 0,70mm 110.000 /m
3 Bondek Galvanis Lebar IDR
1000mm Tebal 0,75mm 115.000 /m
4 Bondek Galvanis Lebar IDR
1000mm Tebal 1,00mm 120.000 /m
8 Bondek Galvalume Lebar IDR
1000mm Tebal 1,00mm 122.000 /m
13 Besi Wiremesh Diameter IDR
8mm (M8) 555.000 /Lbr
88 651.2 M
16 54.4 M
TOTAL KOLOM 705.6 M 58.80 792
86 428.28 M 67.62
2 4.12 M
1 1.36 M
6 6.36 M
7 6.02 M
1 1.38 M
1 1.18 M
X 448.7 37.39 440.0
92 422.28 M
10 18.7 M
Y 440.98 36.75
OTAL BALOK INDUK 889.68 M 74.14 440.0
J T
30 210 17.5
6 18 1.5
19 440 8360
10 49.8 4.15
30 140.7 11.725
10 29.8 2.48333333333333
2 4.7 0.391666666666667
4 22.8 1.9
2 4 0.333333333333333
20.9833333333333 355 7449.08333333333
11 55 4.58333333333333
8 24 2
6.58333333333333 256 1685.33333333333
15 120 10
15 10.65 0.89
4 36 3
4 4.4 0.37
14.25 355 5060.23
36 324 27.00
4 32 2.67
171.84 14.32
0 445 37.08
81.07 118.333333333333 9593.28
2 16 1.33333333333333
6 9 0.75
3 15 1.25
1 2.5 0.208333333333333
2 12 1
1 2 0.166666666666667
4.70833333333333 256 1205.33
19 1.2 22.8
58.0666667 36 0.98 35.28
11.2916667 11 0.8 8.8
66.88
20 140 280 23.3333333333333 5973.33333333333
0.13 11 12 0.89 1
0.12 12 13 1.04 2
0.19 13 14 1.21 3
0.20 14 16 1.58 4
0.22 15 19 2.23 5
0.31 16 22 2.98 6
0.40 17 23 3.26 7
0.53 18 25 3.85 8
0.62 19 28 4.83 9
0.75 20 31 5.93
21 32 6.31
UKURAN IWF
50 x 5 x 7
60 x 6 x 8
100 x 6 x 9
75 x 5 x 7
90 x 5 x 8
99 x 4.5 x 7
100 x 5.5 x 8
124 x 5 x 8
125 x 6 x 9
149 x 6 x 8
150 x 6.5 x 9
174 x 6 x 9
175 x 7 x 11
199 x 7 x 11
200 x 8 x 13
199 x 8 x 12
200 x 9 x 14
200 x 10 x 16
300 x 12 x 20
200 x 11 x 17
300 x 13 x 24
300 x 14 x 26
300 x 16 x 28
25 x 3 x 6
30 x 3 x 6
40 x 3 x 6
40 x 4 x 6
50 x 4 x 6
50 x 5 x 6
60 x 5 x 6
60 x 6 x 6
65 x 6 x 6
70 x 7 x 6
75 x 6 x 6
75 x 8 x 6
80 x 8 x 6
90 x 9 x 6
100 x 8 x 6
100 x 10 x 6
120 x 10 x 12
120 x 12 x 12
125 x 12 x 12
130 x 9 x 12
130 x 12 x 12
UKURAN/
BERAT/LBR*
LBR
2,1m X
15,45 kg
5,4m
2,1m X
24,14 kg
5,4m
2,1m X
34,76 kg
5,4m
2,1m X
47,31 kg
5,4m
2,1m X
61,79 kg
5,4m
2,1m X
78,20 kg
5,4m
2,1m X
96,55 kg
5,4m
2,1m X
139,02 kg
5,4m
mobils
berat
JUMLAH
KG 1KE5 7KE8 10KE11
12KE13 9KE11 7KE8
14 21 10
cat 2 8 6
46,569.60 1.58 18.96 1115
1 2 3..4
5 6 7
cat
32,621.60 1.20 14.40 1068 10
###
5760 216
3550
1 27.5 27.5
2 25.78 25.78
3 1.72 24.06
4 22.34
5 20.62
6 18.9
7 17.18
8 15.46
171.84
70.6 1
64.8 2
5.8 59 3
53.2 4
47.4 5
41.6 6
35.8 7
30 8
24.2 9
18.4 10
445
Diameter Berat Besi
mm Kg / m1
10.00 0.62
13.00 1.04
16.00 1.58
19.00 2.23
22.00 2.98
25.00 3.85
29.00 5.19
32.00 6.31
36.00 7.99
Lampiran 2
BERAT 12 M1
mm 112.00 kg
mm 158.40 kg
mm 253.20 kg
mm 168.00 kg
mm 217.40 kg
mm 218.40 kg
mm 256.00 kg
mm 308.40 kg
mm 355.20 kg
mm 384.00 kg
mm 440.40 kg
mm 497.00 kg
mm 595.20 kg
mm 679.20 kg
mm 792.00 kg
mm 794.40 kg
mm 912.00 kg
mm 1,075.00 kg
mm 1,812.00 kg
mm 1,272.00 kg
mm 2,220.00 kg
mm 2,520.00 kg
mm 2,916.00 kg
BERAT / BATANG
mm 6.72 kg
mm 8.16 kg
mm 11.00 kg
mm 14.50 kg
mm 18.50 kg
mm 22.60 kg
mm 27.30 kg
mm 32.52 kg
mm 35.46 kg
mm 44.28 kg
mm 41.22 kg
mm 54.18 kg
mm 57.96 kg
mm 73.20 kg
mm 73.20 kg
mm 90.60 kg
mm 218.40 kg
mm 260.00 kg
mm 280.00 kg
mm 214.20 kg
mm 280.00 kg
1m3 beton 2.9 2.9 8.41 0.12 1.0092
96.55
827,442.68 13,391.21
61.79 5.45
565,500.00 272,442.68 9,324.45
900,276
880,000.00
1.93 20,275.50
5..12 13
64 4 86
32 4 32 8 104.00
D EF
1KE5
22 56
6 24 19 72
50,764,417.89
Err:509
79,166,540.50
4,523,647.90
Err:509
STANDAR SATUAN HARGA BARANG/JASA KEBUTUHAN
PEMERINTAH KABUPATEN MUNA TAHUN ANGGARAN 2022
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 66,065.63
E Overhead dan Provit 15 % 9,909.84
F Harga Satuan Pekerjaan (D+E) 75,975.47
13 Memasang 1 M' Pipa PVC Tipe AW Diameter 2 1/2"
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.081 OH 110,000 8,910.00
Tukang Pipa 0.135 OH 150,000 20,250.00
Kepala Tukang 0.0135 OH 190,000 2,565.00
Mandor 0.004 OH 150,000 600.00
JUMLAH HARGA TENAGA 32,325.00
B BAHAN
Pipa PVC Tipe AW Diameter 2 1/2" 1.200 M' 39,625 47,550.00
Perlengkapan 0.35 %x Harga Pipa 39,625 13,868.75
JUMLAH HARGA BAHAN 61,418.75
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 93,743.75
E Overhead dan Provit 15 % 14,061.56
F Harga Satuan Pekerjaan (D+E) 107,805.31
PANEL
ME - 66 1 Unit Panel Utama - LVMDP
(Analisa Lapangan)
1.00 Bh ACB 800 A 4 P @ Rp 32,000,000.00 = Rp 32,000,000.00
1.00 Bh ATS @ Rp 30,000,000.00 = Rp 30,000,000.00
2.00 Bh MCCB 160 A/3 Phasa @ Rp 3,400,000.00 = Rp 6,800,000.00
3.00 Bh MCCB 100 A/3 Phasa @ Rp 2,700,000.00 = Rp 8,100,000.00
3.00 Bh MCCB 80 A/3 Phasa @ Rp 2,300,000.00 = Rp 6,900,000.00
5.00 Bh MCCB 50 A/3 Phasa @ Rp 1,900,000.00 = Rp 9,500,000.00
1.00 Bh Motor Mechanism MT 100/1 @ Rp 7,000,000.00 = Rp 7,000,000.00
6.00 Bh CT 150/5 @ Rp 270,000.00 = Rp 1,620,000.00
1.00 Bh Powermeter @ Rp 4,500,000.00 = Rp 4,500,000.00
6.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 132,000.00
6.00 Bh Fuse @ Rp 17,000.00 = Rp 102,000.00
3.00 Unit Box Panel & Accessories @ Rp 1,050,000.00 = Rp 3,150,000.00
1.00 ls Busbar @ Rp 300,000.00 = Rp 300,000.00
1.00 ls Wiring Acc. @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Grounding @ Rp 1,000,000.00 = Rp 1,000,000.00
3.00 Hr Mandor @ Rp 150,000.00 = Rp 450,000.00
6.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 1,140,000.00
12.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 1,800,000.00
15.00 Rp 17,234,100.00 = Rp 17,234,100.00
Jumlah total = Rp 132,128,100.00
ME - 68 1 Unit Panel - PP AB
(Analisa Lapangan)
1.00 Bh MCB 25 A/3 Phasa @ Rp 1,100,000.00 = Rp 1,100,000.00
1.00 Bh MCB 6 A/3 Phasa @ Rp 330,000.00 = Rp 330,000.00
1.00 Bh MCB 10 A/1 Phasa @ Rp 330,000.00 = Rp 330,000.00
3.00 Bh Pilot Lamp @ Rp 22,000.00 = Rp 66,000.00
1.00 Bh Fuse @ Rp 17,000.00 = Rp 17,000.00
1.00 Bh Box Panel ( 50 x 40 x 20 ) c @ Rp 536,250.00 = Rp 536,250.00
1.00 Ls Grounding B @ Rp 400,000.00 = Rp 400,000.00
1.00 Ls Material Bantu (Busbar, dll) @ Rp 250,000.00 = Rp 250,000.00
1.00 Hr Mandor @ Rp 150,000.00 = Rp 150,000.00
1.00 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 190,000.00
1.00 Hr Tukang Listrik @ Rp 150,000.00 = Rp 150,000.00
15.00 Rp 527,887.50 = Rp 527,887.50
Jumlah total = Rp 4,047,137.50
Jumlah total =
ME - 93 1 m' Kabel Tray Lebar uk. 400 x 100
1.00
Bahan
1.00 M' Kabel Tray Lebar 400 x 100 @ Rp 230,000.00 = Rp 230,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.10 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 19,000.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 42,075.00 = Rp 42,075.00
Jumlah total = Rp 322,575.00
ME - 94 1 m' Kabel Tray Lebar uk. 200 x 100
1.00
Bahan
1.00 M' Kabel Tray Lebar 200 x 100 @ Rp 153,908.33 = Rp 153,908.33
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.10 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 19,000.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 30,661.25 = Rp 30,661.25
Jumlah total = Rp 235,069.58
ME - 95 1 m' Kabel Ladder uk. 600 x 100
1.00
Bahan
1.00 M' Kabel Tray Lebar 600 x 100 @ Rp 85,000.00 = Rp 85,000.00
Tenaga
0.01 Hr Mandor @ Rp 150,000.00 = Rp 1,500.00
0.10 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 19,000.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 20,325.00 = Rp 20,325.00
Jumlah total = Rp 155,825.00
Analisa intalasi ME
ME - 98 1 titik instalasi Penerangan Dalam bangunan
1.00
Bahan
6.00 M' Kabel NYM 3x2,5 mm2 @ Rp 12,100.00 = Rp 72,600.00
6.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 27,500.00
1.00 M' Pipa Flexible @ Rp 4,583.33 = Rp 4,583.33
2.00 Bh Tee Doos @ Rp 6,050.00 = Rp 12,100.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
3.00 Bh Las Doop @ Rp 110.00 = Rp 330.00
0.20 Bh Isolasi Listrik @ Rp 27,500.00 = Rp 5,500.00
Tenaga
0.17 Hr Mandor @ Rp 150,000.00 = Rp 25,500.00
0.30 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang @ Rp 150,000.00 = Rp 45,000.00
15.00 Rp 38,086.25 = Rp 38,086.25
Jumlah total = Rp 291,994.58
ME - 100 1 titik instalasi Stop Kontak
1.00
Bahan
12.00 M' Kabel NYM 3x2,5 mm2 @ Rp 12,100.00 = Rp 145,200.00
12.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 55,000.00
1.00 M' Pipa Flexible @ Rp 4,583.33 = Rp 4,583.33
2.00 Bh Tee Doos @ Rp 6,050.00 = Rp 12,100.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
2.00 Bh Las Doop @ Rp 110.00 = Rp 220.00
0.20 Bh Isolasi Listrik @ Rp 27,500.00 = Rp 5,500.00
Tenaga
0.17 Hr Mandor @ Rp 150,000.00 = Rp 25,500.00
0.30 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang @ Rp 150,000.00 = Rp 45,000.00
15.00 Rp 53,084.75 = Rp 53,084.75
Jumlah total = Rp 406,983.08
ME - 101 1 titik instalasi speaker
1.00
Bahan
10.00 M' Kabel NYMHY 2x1,5 mm2 @ Rp 8,200.00 = Rp 82,000.00
10.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 45,833.33
3.00 Bh Socket Pipa @ Rp 4,583.33 = Rp 13,750.00
2.00 Bh Tee Doos @ Rp 6,050.00 = Rp 12,100.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
Tenaga
0.17 Hr Mandor @ Rp 150,000.00 = Rp 25,500.00
0.30 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 57,000.00
0.30 Hr Tukang @ Rp 150,000.00 = Rp 45,000.00
15.00 Rp 42,746.75 = Rp 42,746.75
Jumlah total = Rp 327,725.08
ME - 102 1 TITIK PEMASANGAN INSTALASI CCTV
1.00
(Dari Switch Poe Ke Kamera CCTV)
Bahan
26.00 m' Kabel UTP cat. 6 @ Rp 6,852.46 = Rp 178,163.93
26.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 119,166.67
4.00 bh sok lurus @ Rp 770.00 = Rp 3,080.00
2.00 bh Connector RJ 45 @ Rp 11,000.00 = Rp 22,000.00
6.00 Bh Klem Pipa @ Rp 715.00 = Rp 4,290.00
12.00 bh Fisher + Sekrup @ Rp 275.00 = Rp 3,300.00
1.00 M' Flexible Conduit @ Rp 6,490.00 = Rp 6,490.00
Tenaga
0.70 o/hr Pekerja @ Rp 150,000.00 = Rp 105,000.00
0.40 o/hr Tukang listrik @ Rp 190,000.00 = Rp 76,000.00
0.04 o/hr Mandor @ Rp 150,000.00 = Rp 6,000.00
15.00 Rp 78,523.59 = Rp 78,523.59
Jumlah total Rp 602,014.19
ME - 103 1 M' INSTALASI KABEL UTP CAT. 6
1.00
Bahan
1.00 m' Kabel UTP cat. 6 @ Rp 6,852.46 = Rp 6,852.46
1.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 4,583.33
0.50 bh sok lurus @ Rp 770.00 = Rp 385.00
0.50 bh Connector RJ 45 @ Rp 11,000.00 = Rp 5,500.00
0.30 M' Pipa Flexible @ Rp 6,490.00 = Rp 1,947.00
1.00 Bh Klem Pipa @ Rp 715.00 = Rp 715.00
2.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 550.00
Tenaga
0.02 o/hr Pekerja @ Rp 150,000.00 = Rp 2,250.00
0.15 o/hr Tukang listrik @ Rp 190,000.00 = Rp 28,500.00
0.20 o/hr Mandor @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 12,192.42 = Rp 12,192.42
Jumlah total Rp 93,475.21
ME - 104 1 titik instalasi MATV
1.00
Bahan
16.00 M' Kabel Coaxial RG 6 5C @ Rp 11,995.41 = Rp 191,926.56
16.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 73,333.33
3.00 bh sok lurus @ Rp 770.00 = Rp 2,310.00
3.00 Bh Klem Pipa @ Rp 715.00 = Rp 2,145.00
6.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 1,650.00
0.25 M' Flexible Conduit @ Rp 6,490.00 = Rp 1,622.50
Tenaga
0.70 Hr Mandor @ Rp 150,000.00 = Rp 105,000.00
0.40 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 76,000.00
0.04 Hr Tukang @ Rp 150,000.00 = Rp 6,000.00
15.00 Rp 68,998.11 = Rp 68,998.11
Jumlah total = Rp 528,985.50
ME - 105 1 m' Kabel Coaxial RG-11 ( 7 C /2V )
1.00
Bahan
1.00 M' Kabel Coaxial RG 11 7C @ Rp 11,000.00 = Rp 11,000.00
1.00 M' Pipa Conduit @ Rp 4,583.33 = Rp 4,583.33
0.30 M' Pipa Flexible @ Rp 6,490.00 = Rp 1,947.00
1.00 Bh Klem Pipa @ Rp 715.00 = Rp 715.00
2.00 Bh Fisher + Sekrup @ Rp 275.00 = Rp 550.00
Tenaga
0.02 Hr Mandor @ Rp 150,000.00 = Rp 2,250.00
0.15 Hr Kepala Tukang listrik @ Rp 190,000.00 = Rp 28,500.00
0.20 Hr Tukang @ Rp 150,000.00 = Rp 30,000.00
15.00 Rp 11,931.80 = Rp 11,931.80
Jumlah total = Rp 91,477.13
1 Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.65 OH 110,000.00 181,500.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Kepala Tukang L.03 0.028 OH 190,000.00 5,320.00
Mandor L.04 0.083 OH 150,000.00 12,450.00
JUMLAH HARGA TENAGA 240,520.00
B BAHAN
Semen Portland 247 kg 1,640.00 405,080.00
Pasir Beton Maligano 869 kg 141.07 122,591.07
Kerikil Beton Maligano (Pecah manual) 999 kg 244.67 244,422.00
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 793,593.07
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,034,113.07
E Overhead dan Provit 15 % 155,116.96
F Harga Satuan Pekerjaan (D+E) 1,189,230.03
2 Membuat 1 m3 beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.65 OH 110,000.00 181,500.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Kepala Tukang L.03 0.028 OH 190,000.00 5,320.00
Mandor L.04 0.083 OH 150,000.00 12,450.00
JUMLAH HARGA TENAGA 240,520.00
B BAHAN
Semen Portland 406 kg 1,640.00 665,840.00
Pasir Beton Maligano 684 kg 141.07 96,492.86
Kerikil Beton Maligano (Pecah manual) 1026 kg 244.67 251,028.00
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,034,860.86
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,275,380.86
E Overhead dan Provit 15 % 191,307.13
F Harga Satuan Pekerjaan (D+E) 1,466,687.99
3 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 1.65 OH 110,000.00 181,500.00
Tukang Batu L.02 0.275 OH 150,000.00 41,250.00
Kepala Tukang L.03 0.028 OH 190,000.00 5,320.00
Mandor L.04 0.083 OH 150,000.00 12,450.00
JUMLAH HARGA TENAGA 240,520.00
B BAHAN
Semen Portland 413 kg 1,640.00 677,320.00
Pasir Beton Maligano 681 kg 141.07 96,069.64
Kerikil Beton Maligano (Pecah manual) 1021 kg 244.67 249,804.67
air 215 Liter 100.00 21,500.00
JUMLAH HARGA BAHAN 1,044,694.31
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,285,214.31
E Overhead dan Provit 15 % 192,782.15
F Harga Satuan Pekerjaan (D+E) 1,477,996.46
4 Pembesian 10 kg dengan besi ulir
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja L.01 0.07 OH 110,000.00 7,700.00
Tukang Besi Konstruksi L.02 0.07 OH 150,000.00 10,500.00
Kepala Tukang L.03 0.007 OH 190,000.00 1,330.00
Mandor L.04 0.004 OH 150,000.00 600.00
JUMLAH HARGA TENAGA 20,130.00
B BAHAN
Besi Beton Ulir 10.5 kg 26,000.00 273,000.00
Kawat Beton 0.15 kg 26,400.00 3,960.00
JUMLAH HARGA BAHAN 276,960.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 297,090.00
E Overhead dan Provit 15 % 44,563.50
F Harga Satuan Pekerjaan (D+E) 341,653.50
UNTUK /KG 34,165.35
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 18,690.50
E Overhead dan Provit 15 % 2,803.58
F Harga Satuan Pekerjaan (D+E) 21,494.08
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 36,510.00
E Overhead dan Provit 15 % 5,476.50
F Harga Satuan Pekerjaan (D+E) 41,986.50
Pemasangan 1 kg Rangka kuda-kuda Besi Baja IWF
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.06 OH 110,000.00 6,600.00
Tukang Besi Konstruksi L.02 0.06 OH 150,000.00 9,000.00
Kepala Tukang L.03 0.006 OH 190,000.00 1,140.00
Mandor L.04 0.003 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 17,190.00
B BAHAN
Besi Baja IWF 1.15 Kg 17,200.00 19,780.00
Pekerjaan 1 bh Beugel U alas kuda-kuda (plat baja 4,4mm) baut dia 10mm
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1 OH 110,000.00 11,000.00
Tukang Besi Konstruksi L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.001 OH 190,000.00 190.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 26,940.00
B BAHAN
Beghel U Besi Plat Baja U 4.40mm 1 bh 28,000.00 28,000.00
Baut Dia. 10mm 1 bh 5,000.00 5,000.00
-
JUMLAH HARGA BAHAN 33,000.00
C PERALATAN
2 BH PEKERJAAN BAUT DIA.10 mm Sambungan gording 5/10 atau 6/12 cm per titik
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.1 OH 110,000.00 11,000.00
Tukang Besi Konstruksi L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.001 OH 190,000.00 190.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 26,940.00
B BAHAN
Baut Dia. 10mm 2 bh 5,000.00 10,000.00
-
JUMLAH HARGA BAHAN 10,000.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 381,815.00
E Overhead dan Provit 15 % 57,272.25
F Harga Satuan Pekerjaan (D+E) 439,087.25
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 7,268.13
E Overhead dan Provit 15 % 1,090.22
F Harga Satuan Pekerjaan (D+E) 8,358.34
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, Untuk partisi
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.25 OH 110,000.00 27,500.00
Tukang Besi Konstruksi L.02 0.25 OH 150,000.00 37,500.00
Kepala Tukang L.03 0.025 OH 190,000.00 4,750.00
Mandor L.04 0.013 OH 150,000.00 1,950.00
JUMLAH HARGA TENAGA 71,700.00
B BAHAN
Rangka Plafond Hollo 4.4.02 3.5 m’ 24,333.33 85,166.67
Aksesori, perkuatan las dll 1 LS 24,333.33 24,333.33
JUMLAH HARGA BAHAN 109,500.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 181,200.00
E Overhead dan Provit 15 % 27,180.00
F Harga Satuan Pekerjaan (D+E) 208,380.00
Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.35 OH 110,000.00 38,500.00
Tukang Besi Konstruksi L.02 0.35 OH 150,000.00 52,500.00
Kepala Tukang L.03 0.035 OH 190,000.00 6,650.00
Mandor L.04 0.018 OH 150,000.00 2,700.00
JUMLAH HARGA TENAGA 100,350.00
B BAHAN
Rangka Plafond Hollo 4.4.02 4 m’ 24,333.33 97,333.33
Assesoris rangka besi hollow plafond 1 LS 5,000.00 5,000.00
JUMLAH HARGA BAHAN 102,333.33
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 202,683.33
E Overhead dan Provit 15 % 30,402.50
F Harga Satuan Pekerjaan (D+E) 233,085.83
mengerjakan dan Memasang 1 m1 kusen Jendela rangka alluminium fin coating Powder
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja L.01 0.043 OH 110,000.00 4,730.00
Tukang Besi Konstruksi L.02 0.004 OH 150,000.00 600.00
Kepala Tukang L.03 0.043 OH 190,000.00 8,170.00
Mandor L.04 0.002 OH 150,000.00 300.00
JUMLAH HARGA TENAGA 13,800.00
B BAHAN
kusen profil alumunium 4' fin coathing powder 1.1 m 136,500.00 150,150.00
Secrup fisher 2 bj 500.00 1,000.00
Sealant 0.11 Tube 25,000.00 2,750.00
JUMLAH HARGA BAHAN 153,900.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 167,700.00
E Overhead dan Provit 15 % 25,155.00
F Harga Satuan Pekerjaan (D+E) 192,855.00
A.4.2.1.22 Memasang 1 m2 Atap Pelana rangka atap baja (canai dingin) profil C75
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.734 OH 110,000.00 80,740.00
Tukang Besi Konstruksi 0.734 OH 150,000.00 110,100.00
Kepala Tukang 0.073 OH 190,000.00 13,870.00
Mandor 0.037 OH 150,000.00 5,550.00
JUMLAH HARGA TENAGA 210,260.00
B BAHAN
Main Truss C-75,0.75 0.873 M1 26,667 23,280.00
JUMLAH HARGA BAHAN 23,280.00
C PERALATAN
10 %(bahan) 2,666.67
7 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 2 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 18.95 Kg 1,640.00 31,078.00
Pasir Pasang 0.038 M3 170,000.00 6,460.00
JUMLAH HARGA BAHAN 103,688.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 155,838.00
E Overhead dan Provit 15 % 23,375.70
F Harga Satuan Pekerjaan (D+E) 179,213.70
8 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 3 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 14.37 Kg 1,640.00 23,566.80
Pasir Pasang 0.04 M3 170,000.00 6,800.00
JUMLAH HARGA BAHAN 96,516.80
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 148,666.80
E Overhead dan Provit 15 % 22,300.02
F Harga Satuan Pekerjaan (D+E) 170,966.82
9 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 4 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 11.5 Kg 1,640.00 18,860.00
Pasir Pasang 0.043 M3 170,000.00 7,310.00
JUMLAH HARGA BAHAN 92,320.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 144,470.00
E Overhead dan Provit 15 % 21,670.50
F Harga Satuan Pekerjaan (D+E) 166,140.50
10 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1 PC : 5 PP
Kode
No Uraian Koefisien Satuan Harga satuan (Rp) Jumlah Harga (Rp)
Satuan
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.1 OH 150,000.00 15,000.00
Kepala Tukang L.03 0.01 OH 190,000.00 1,900.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 52,150.00
B BAHAN
Batu Merah 5 x 11 x 22 cm 70 Bh 945.00 66,150.00
Semen Portland 9.68 Kg 1,640.00 15,875.20
Pasir Pasang 0.045 M3 170,000.00 7,650.00
JUMLAH HARGA BAHAN 89,675.20
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 141,825.20
E Overhead dan Provit 15 % 21,273.78
F Harga Satuan Pekerjaan (D+E) 163,098.98
ANALISA HARGA SATUAN
PEKERJAAN PLESTERAN
JDIH Kementrian PUPR 2022
Memasang 1 m2 plesteran 1 PC : 2 PP, tebal 15 mm
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.3 OH 110,000.00 33,000.00
Tukang Batu L.02 0.15 OH 150,000.00 22,500.00
Kepala Tukang L.03 0.015 OH 190,000.00 2,850.00
Mandor L.04 0.015 OH 150,000.00 2,250.00
JUMLAH HARGA TENAGA 60,600.00
B BAHAN
Semen Portland 10.224 Kg 1,640.00 16,767.36
Pasir Pasang 0.02 M3 170,000.00 3,400.00
JUMLAH HARGA BAHAN 20,167.36
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 80,767.36
E Overhead dan Provit 15 % 12,115.10
F Harga Satuan Pekerjaan (D+E) 92,882.46
Memasang 1 m2 acian
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja L.01 0.100 OH 110,000.00 11,000.00
Tukang Batu L.02 0.050 OH 150,000.00 7,500.00
Kepala Tukang L.03 0.005 OH 190,000.00 950.00
Mandor L.04 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 20,200.00
B BAHAN
Semen Portland 3.25 kg 1,640.00 5,330.00
2 Membuat dan memasang 1 m2 daun pintu panel, kayu kelas I Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 1 OH 110,000.00 110,000.00
Tukang Kayu 3 OH 150,000.00 450,000.00
Kepala Tukang 0.3 OH 190,000.00 57,000.00
Mandor 0.05 OH 150,000.00 7,500.00
JUMLAH HARGA TENAGA 624,500.00
B BAHAN
Papan kayu kelas I 0.04 M3 4,547,000 181,880.00
Lem Kayu 0.5 kg 21,000 10,500.00
Engsel 2 bh 39,600 79,200.00
Kunci Tanam Antik 1 bh 184,500 184,500.00
Grendel Pintu Kuningan 1 bh 11,950 11,950.00
JUMLAH HARGA BAHAN 468,030.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 1,092,530.00
E Overhead dan Provit 15 % 163,879.50
F Harga Satuan Pekerjaan (D+E) 1,256,409.50
3 Memasang 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.15 OH 110,000.00 16,500.00
Tukang Kayu 0.3 OH 150,000.00 45,000.00
Kepala Tukang 0.03 OH 190,000.00 5,700.00
Mandor 0.075 OH 150,000.00 11,250.00
JUMLAH HARGA TENAGA 78,450.00
B BAHAN
Kaso-kaso 5 x7 cm 0.0154 M3 2,360,000 36,344.00
Paku 7 cm – 10 cm 0.2 kg 23,000 4,600.00
JUMLAH HARGA BAHAN 40,944.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 119,394.00
E Overhead dan Provit 15 % 17,909.10
F Harga Satuan Pekerjaan (D+E) 137,303.10
4 Memasang 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.2 OH 110,000.00 22,000.00
Tukang Kayu 0.3 OH 150,000.00 45,000.00
Kepala Tukang 0.03 OH 190,000.00 5,700.00
Mandor 0.01 OH 150,000.00 1,500.00
JUMLAH HARGA TENAGA 74,200.00
B BAHAN
Kaso-kaso 5 x7 cm 0.0163 M3 2,360,000 38,468.00
Paku 7 cm – 10 cm 0.25 kg 23,000 5,750.00
JUMLAH HARGA BAHAN 44,218.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 118,418.00
E Overhead dan Provit 15 % 17,762.70
F Harga Satuan Pekerjaan (D+E) 136,180.70
5 Memasang 1 m1 lisplank ukuran (3 x 20) cm, kayu kelas I Permen PUPR 2016
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.1 OH 110,000.00 11,000.00
Tukang Kayu 0.2 OH 150,000.00 30,000.00
Kepala Tukang 0.02 OH 190,000.00 3,800.00
Mandor 0.005 OH 150,000.00 750.00
JUMLAH HARGA TENAGA 45,550.00
B BAHAN
Papan kayu kelas I 0.011 M3 2,360,000 25,488.00
Paku 5 cm dan 7 cm 0.1 kg 23,000 2,300.00
JUMLAH HARGA BAHAN 27,788.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 73,338.00
E Overhead dan Provit 15 % 11,000.70
F Harga Satuan Pekerjaan (D+E) 84,338.70
ANALISA SATUAN PEKERJAAN
PEKERJAAN PENUTUP ATAP
Memasang 1 m2 langit-langit papan kayu Jati T 20 mm L 80-100m JDIH Kementrian PUPR 2022
Harga satuan Jumlah Harga
No Uraian Kode Satuan Koefisien Satuan
(Rp) (Rp)
A TENAGA
Pekerja 0.8 OH 110,000.00 88,000.00
Tukang Kayu 0.8 OH 150,000.00 120,000.00
Kepala Tukang 0.08 OH 190,000.00 15,200.00
Mandor 0.04 OH 150,000.00 6,000.00
JUMLAH HARGA TENAGA 229,200.00
B BAHAN
Kayu Papan 0.015 m3 2,360,000.00 35,400.00
Paku 5cm 0.01 kg 23,000.00 230.00
JUMLAH HARGA BAHAN 35,630.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 264,830.00
E Overhead dan Provit 15 % 39,724.50
F Harga Satuan Pekerjaan (D+E) 304,554.50
ANALISA HARGA SATUAN
PEKERJAAN PENGECATAN
JDIH Kementrian PUPR 2022
6.14. 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 lapis Cat Penutup)
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.020 OH 110,000.00 2,200.00
Tukang Cat 0.063 OH 150,000.00 9,450.00
Kepala Tukang 0.0063 OH 190,000.00 1,197.00
Mandor 0.0030 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 13,297.00
B BAHAN
Plamir Tembok 0.100 Kg 25,500 2,550.00
Cat Dasar Tembok (standart) 0.100 Kg 38,200 3,820.00
Cat Penutup Tembok (standart) 0.260 Kg 46,000 11,960.00
JUMLAH HARGA BAHAN 18,330.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 31,627.00
E Overhead dan Provit 15 % 4,744.05
F Harga Satuan Pekerjaan (D+E) 36,371.05
A.4.7.1.4 1 m2 Pengecatan Bidang Kayu Baru (1 lapis cat dasar 2 lapis cat Penutup)
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.070 OH 110,000.00 7,700.00
Tukang Cat 0.009 OH 150,000.00 1,350.00
Kepala Tukang 0.006 OH 190,000.00 1,140.00
Mandor 0.0030 OH 150,000.00 450.00
JUMLAH HARGA TENAGA 10,640.00
B BAHAN
Cat meni 0.200 Kg 27,700 5,540.00
plamur 0.150 Kg 25,500 3,825.00
cat dasar 0.170 Kg 52,000 8,840.00
cat penutup 0.260 Kg 62,400 16,224.00
pengencer 0.010 Kg 46,500 465.00
Ampelas 0.030 Lbr 1,000 30.00
Kuas 5" 0.200 Bh 34,300 6,860.00
JUMLAH HARGA BAHAN 41,784.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 52,424.00
E Overhead dan Provit 15 % 7,863.60
F Harga Satuan Pekerjaan (D+E) 60,287.60
A.4.7.1.21 1 m2 Pengecatan permukaan besi galvanis secara semprot 3 lapis cat mutakhir
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.400 OH 110,000.00 44,000.00
Tukang Cat 0.700 OH 150,000.00 105,000.00
Kepala Tukang 0.070 OH 190,000.00 13,300.00
Mandor 0.020 OH 150,000.00 3,000.00
JUMLAH HARGA TENAGA 165,300.00
B BAHAN
cat dasar 0.300 kg 52,000 15,600.00
pengencer 0.010 ltr 46,500 465.00
JUMLAH HARGA BAHAN 16,065.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 181,365.00
E Overhead dan Provit 15 % 27,204.75
F Harga Satuan Pekerjaan (D+E) 208,569.75
A.4.7.1.20 1 m2 Pengecatan permukaan besi galvanis secara manual 3 lapis
Kode Harga satuan
No Uraian Koefisien Satuan Jumlah Harga (Rp)
Satuan (Rp)
A TENAGA
Pekerja 0.400 OH 110,000.00 44,000.00
Tukang Cat 0.800 OH 150,000.00 120,000.00
Kepala Tukang 0.080 OH 190,000.00 15,200.00
Mandor 0.020 OH 150,000.00 3,000.00
JUMLAH HARGA TENAGA 182,200.00
B BAHAN
cat dasar 0.110 kg 52,000 5,720.00
cat antara 0.170 kg 62,400 10,608.00
cat penutup 0.080 kg 62,400 4,992.00
pengencer 0.010 ltr 46,500 465.00
Kuas 5" 0.010 Bh 34,300 343.00
JUMLAH HARGA BAHAN 22,128.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 204,328.00
E Overhead dan Provit 15 % 30,649.20
F Harga Satuan Pekerjaan (D+E) 234,977.20
DAFTAR HARGA SATUAN UPAH, BAHAN DAN SEWA ALAT
PEKERJAAN : PEMBANGUNAN KANTOR DINAS PERPUSTAKAAN DAN KEARSIPAN DAERAH
LOKASI : KABUPATEN MUNA
TAHUN ANGGARAN : 2022
Harga Satuan
No. Uraian Satuan
(Rp.)
1 2 3 4
I UPAH KERJA
1 Mandor Oh
2 Pekerja Oh
3 Kepala Tukang Oh
4 Tukang Kayu Oh
5 Tukang Batu Oh
6 Tukang Cat Oh
7 Tukang Las Biasa Oh
8 Tukang las Konstruksi Oh
9 Tukang Gali Oh
10 Tukang Besi Konstruksi Oh
11 Tukang Khusus alluminium Oh
12 Tukang Oh
13 Tukang Alluminium/Kaca Oh
14 Tukang Pipa Oh
II HARGA BAHAN
Semen Portland Kg
Semen Abu-abu Kg
Semen Merah M3
Semen Warna Kg
Semen Nat Kg
Kawat Bidrat/ kawat beton Kg
Tiang Pancang Beton Dia 30 cm m1
Handling tiang pancang di site Batang
Pemancangan Tiang m1
Penyambungan Tiang titik
Potong Kepala Tiang titik
Buis Beton 30 cm bh
Besi Beton Polos Kg
Besi Beton Ulir Kg
Besi pipa galvanis 6 '' kg
Besi pipa galvanis 2.5 '' kg
Besi beton D 6'' -12 m Batang
Besi beton D 8'' -12 m Batang
Besi beton D 10'' -12 m Batang
Besi beton D 12'' -12 m Batang
Besi beton D 14'' -12 m Batang
Besi beton D 16'' -12 m Batang
Rangka Plafond hollow 40.40.2 mm M
Rangka Plafond hollow 20.40.2 mm M
Assesoris rangka besi hollow dinding partisi Ls
Assesoris rangka besi hollow plafond Ls
Besi Profil Kg
Besi strip tebal 5 mm Kg
Besi Baja WF 400x200x8x13 mm Kg
Besi Baja WF 350x175x7x11 mm(harga surabaya) kg
Mobilisasi surabaya - Rha Ls
Besi Baja WF 200x100x5,8x8 mm(harga surabaya) kg
Mobilisasi surabaya - Raha Ls
Besi Baja WF 100x50x5x7 mm(harga surabaya) kg
Mobilisasi surabaya - Rah Ls
Besi Baja WF 150x75x5x7 mm(harga surabaya) kg
Mobilisasi surabaya - Ra Ls
Besi Baja WF 300x150x6,5x9 mm(harga surabaya) kg
Mobilisasi surabaya - Rh Ls
Atap Bitumen (Onduvila) Lbr
Atap Spandek silver 0,55 mm M1
Nok Atap Onduvilla Lbr
Liskplank Woodplank M1
Besi Hollow 2.4.0,4 cm M
Besi Hollow 4.4.0,4 cm M
Kalsiclad 1200.2700.10 mm M2
ACP M2
ACP Cutting M2
Alumunium Profil uk.3''-4.00 m natural batang
Alumunium Profil uk.4''-4.00 m natural batang
Alumunium strip 6 mm m2
Alumunium strip 8 mm m2
profil daun jendela lebar 8 cm m1 Profil Allumunium Jendela Casemen
profil daun jendela lebar 10 cm m1
panel sunscreen alumunium coloubond m2
pintu alumunium m2
Rolling door one sheet m2
Handle alumunium m2
Karet aksesoris pintu dan jendela m2
Jalusi alumunium m2
sunscreen alumunium m2
Sealent tube
karet kaca m
paku tembak payung bh
kaca tempered m2
Overpanel Pivot Patch Fitting PT 2240 US32 bh
Top Patch Fitting PT 2220 US32 bh
Bottom Patch Fitting PT 2210 US32 bh
Floor Hinge FH 84FB S bh
Patch Lock US2210 US32 bh
Double Cylinder DC.Fn1001-60 US14 bh
Pull Handle GHD4502 uk. 600x900mm US32 bh
Wiremesh m 10 m2
Wioremesh m 6 m2
Bondek m2
Besi plat baja kg
plate strip T 5-12 L 38-75 kg
plate strip T 6-12 L 100 kg
baut/mur kg
Dynabolt 10x60 mm bh
Dynabolt 10x80 mm bh
Dynabolt 12x12 mm bh
Baut besi 5/8-30 cm Batang
Baut besi 5/8-12 cm Batang
Baut besi 1/2-35 cm Batang
Baut besi 1/2-37 cm Batang
Baut besi 1/2-27 cm Batang
Baut besi 1/2-25 cm Batang
Baut besi 1/2-22 cm Batang
Baut besi 1/2-18 cm Batang
Baut besi 1/2-15 cm Batang
Baut besi 1/2-12 cm Batang
baut D16 mm P 450 mm bh
baut D12 mm P 250 mm bh
baut D12 mm P 350 mm bh
baut D10 mm P 150 mm bh
baut D10 mm P 200 mm bh
baut D80 mm P 120 mm bh
besi siku 4,2x40
Besi siku2,2x3
Besi siku 3,2x40
Besi siku L 30.30.3 kg
Besi scuare tube m
Besi lis kaca (1 x 1) cm m
Baja strip (0,2 x 2) cm kg
Besi angkur φ =8 mm kg
Paku Kg
Paku Biasa Kg
Paku Biasa 2" - 5" Kg
Paku Biasa 1/2" - 1" Kg
Paku 12 cm Kg
Paku Pancing Kg
Paku Hak Panjang 15 cm Kg
Paku Sekrup Kg
Paku skrup 10 cm Kg
Paku Sekrup 3,5" Kg
Paku skrup 1 cm – 2,5 cm Kg
Paku 1 cm - 2,5 cm Kg
Paku 5 cm – 12 cm Kg
Paku 5 cm – 10 cm Kg
Paku 5 cm – 7 cm Kg
Paku 7 cm – 10 cm Kg
Paku 5 cm dan 7 cm Kg
Paku 5 cm dan 10 cm Kg
Paku 10 cm Kg
Paku 12 cm Kg
Paku tripleks Kg
Paku Seng Kg
Skrup fixer bh
Kawat diameter 4 mm Kg
Kawat Duri Kg
Kawat Beton Kg
Kawat Nyamuk M2
kawat las Stainlesteel kg
Stainlesteel Kotak 40/40 mm M
Stainlesteel Kotak 20/40 mm M
Besi Plat 2.2x30 mm M
Besi Siku 40x40 mm M
Kawat las listrik kg
Jaring kawat baja dilas Kg
Truss C75.35.7 chord m1
Reng Botton U33.045 m1
Strap Bracing m1
Screw 12-14x20 HolDip Galvanized buah
Screw 10-16x16 HolDip Galvanized buah
Dynabol dia-12 x 120 mm Bh
Keramik warna 40 x 40 cm Bh
Keramik putih 40 x 40 cm Bh
Keramik warna 30 x30 cm Bh
Keramik putih 30 x 30 cm Bh
Keramik Warna 20 x 25 cm Bh
Keramik Putih 20 x 25 cm Bh
Keramik Warna 20 x 20 cm Bh
Granite (Kasar) 60 x 60 bh
Granite 60 x 60 bh
Granite (sejenis) 60 x 60 Cm bh
Keramik warna Lis 10 x 40 cm Bh
Keramik warna lis 10 x 60 cm Bh
Keramik Artistik 10 x 20 cm Bh
Keramik Artistik 5 x 20 cm Bh
Paving Block M2 M2
Paving Block Bh
Karpet m2
Under Layer Bh
Batu Alam 15x30 M2
Kaca, Tebal 5 mm M2
Kaca, Tebal 8 mm M2
Kaca Buram, Tebal 12 mm M2
Kaca Cermin, Tebal 5 mm M2
Kaca Cermin, Tebal 6 mm M2
Kaca Cermin, Tebal 8 mm M2
Kaca Wireglass, Tebal 5 mm M2
Kaca Patri, Tebal 5 mm M2
Triplex 3 mm (122x244 Cm) lbr
Plywood 4 mm Lbr
Plywood 4 mm (90 x 220) Lbr
Plywood 4" x 8" x 6 mm Lbr
Plywood Tebal 9 mm Lbr
Tepung gypsum kg
Kalsiboard (120x240x4)mm lbr
Akustik Ukuran 30 x 30 cm Lbr
Akustik Ukuran 30 x 60 cm Lbr
Akustik Ukuran 60 x 120 cm Lbr
List gypsum profil 10/10 cm M
List Kayu Profil 5/5 cm klas II M
List gypsum profil 12/12 cm M
List Gypsum 2/5 M
Seng Gelombang 3" - 5 " kaki
Seng Gelombang 3' x 6" Bjls. 28 Lbr
Cat Dasar Kayu Kg
Cat Penutup Kayu Kg
Cat Penutup Kayu (2 Kali) Kg
Cat Penutup Kayu (3 Kali) Kg
Cat Dasar Tembok (standart) Kg
Cat Penutup Tembok (standart) Kg
Cat Dasar Tembok (anti lumut) Kg
Cat Penutup Tembok (Dulux) Kg
Cat Permukaan Baja Kg
Cat Baja Kg
Cat Dasar Baja Kg
Cat Antara Baja Kg
Cat Penutup Baja Kg
Cat Meni Kg
Plamir / dempul Kayu Kg
Plamir Tembok Kg
Politur Ltr
Politur Jadi Ltr
Soda Api Kg
Sabun Kg
Ampelas Lbr
Kuas Bh
Kalkarium Kg
Alang-Alang Ikat
Wall Paper M3
Residu Ltr
Pengencer Ltr
air Ltr
Teak Oil Ltr
Minyak Bekisting/ minyak cat Ltr
Lem Kayu Kg
Dempul fiber Kg
Cat dasar fiber Kg
Cat penutup fiber Kg
Tiner/ pengencer Ltr
Vernis Ltr
Kunci Tanam Bh
Kunci Tanam Antik Bh
Kunci Tanam Biasa Bh
Kunci Tanam Kamar Mandi Bh
Kunci Silinder Bh
Kunci Selot Pintu Bh
Kunci Selot Jendela Bh
Engsel Pintu Bh
Engsel Jendela Bh
Kait Angin Bh
Handle Pintu 40 cm stainlesteel Bh
Kloset Duduk lengkap Tabung Standart Bh
Kloset Duduk + jetwasher (lengkap 1 set) ex toto Bh
Kloset Jongkok Porselen Bh
Kloset Jongkok Teraso Bh
Urinoir Bh
Wastafel Standar Bh
Washtafel Ex toto (lengkap)+kran Bh
Urinoir Ex toto ( lengkap) + kran Bh
Bak Fibreglass Bh
Bak Cuci Stainless Steel 1 lubang Bh
Bak Cuci Teraso Bh
Badkip ex. Toto lengkap Kg
Hand Shower Standart Bh
Seal Tape Bh
Gymfloor M2
Floor Drain stainlesteel Bh
Tank Air Fiber 1200 liter Bh
Floor Hardener
Pipa Tanah Bh
Pipa Beton Bh
Pipa Galvanis Diameter 1/2" M'
Pipa Galvanis Diameter 3/4" M'
Pipa Galvanis Diameter 1" M'
Pipa Galvanis Diameter 1 1/2" M'
Pipa Galvanis Diameter 3" M'
Pipa Galvanis Diameter 4" M'
Pipa PVC Tipe AW Diameter 1/2" M'
Pipa PVC Tipe AW Diameter 3/4" M'
Pipa PVC Tipe AW Diameter 1" M'
Pipa PVC Tipe AW Diameter 1 1/2" M'
Pipa PVC Tipe AW Diameter 2" M'
Pipa PVC Tipe AW Diameter 2 1/2" M'
Pipa PVC Tipe AW Diameter 3" M'
Pipa PVC Tipe AW Diameter 4" M'
Pipa Gyp diamenetr 3 inci Set
Kran Air 3/4" Bh
Kran Air1/2" Bh
Waterstop Lebar 150 mm M'
Waterstop Lebar 200 mm M'
Waterstop Lebar 230 mm M'
Instalasi Lampu Ttk
Instalasi AC Ttk
Instalasi TV/ TV Kabel Ttk
Saklar Tunggal Bh
Saklar Ganda Bh
Stop Kontak Bh
Lampu Tanam SL 20 watt Bh
Lampu TL18 Watt Bh
Lampu TL 25 Watt Bh
Lampu Tempel Tiang Bh
Lampu LED Kuning Bh
BAHAN LOKAL
Tanah Timbunan Pilihan M3
Tanah Timbunan Biasa M3
Pasir Urug M3
Pasir Beton Maligano M3
Pasir Pasang M3
Batu Belah M3
Batu Pecah 2-3 cm (Pecah Manual) M3
Batu Granito Kg
Batu Teraso Kg
Batu Apung Kg
Kerikil Beton Maligano (Pecah manual) M3
Kerikil Kali maligano M3
Batu Merah 5 x 11 x 22 cm Bh
Bata Berongga Bh
Bata Pelapis Dinding Bh
Bata Poros Bh
Bata Tempel Hitam Bh
Lisplank GRC 30 CM M
Papan kayu Jati M3
Papan kayu kelas I M3
Papan kayu kelas II m3
Lambersering kayu klas I m3
Papan kayu kelas III (perancah) M3
Balok kayu Jati M3
Balok kayu kelas I M3
Balok kayu kelas II M3
Balok Kayu Kelas III (perancah) M3
Reng (3 x 4) cm Kelas II M3
Kayu 5/7 klas II M3
Kusen Alumunium M1
Bingkai/Daun Jendela Alumunium M2
Bambu Dia. 6 - 8/600 cm Btg
Dolken dia. 5 cm Btg
Dolken dia. 8 - 10 cm Btg
Dolken dia.15 cm Btg
Besi Kotak 12 mm (ut teralis jendela) 12 m/btg M
Perancah kayu kayu klas III M3
Carpet M2
Underlyer Tebal 6 mm/Rubber Corrugated M2
Parquet M2
Lem vinyl Kg
Wall Paper m
Mastercron "S" Kg
Aluminium C Kg
Aluminium B Kg
Strorox – 100 Kg
Formite/penjaga jarak bekisting/spacer btg
Pengelasan cm
Sealant tube
Paving Blok 8/10/20 Bh
Las cm
Alluminium strip m
Venetions blinds dan vertical blinds (tirai) m2
Solar Ltr
Minyak pelumas Ltr
BBM ltr
Ramset bh
III LANDSECAPE
Pohon Palem Batang
Pohon Mahoni Batang
Pohon Tram Besi/suar Batang
Pohon cendana Batang
Pohon Glodokan Batang
Pohon Johar Batang
Pupuk Kandang Karung
Furadan Kg
Rumput Gaja Mini M2
Bambu Krisik Jepang Batang
IV SEWA ALAT
Sewa alat perakitan jam
Sewa alat las listrik jam
Mesin Pancang Ls
Alat Bantu Pengecatan m2
Alat bantu pasang baja ringan m2
Mobilisasi alat baja ringan Ls
V PERALATAN K3 DAN PENCEGAHAN COVID 19
Helm Kerja Buah
Sepatu Lumpur Pasang
Masker N95 Buah
Sarung Tangan Karet Lateks Pasang
Hand Sanitizer Liter
Pengukur Suhu Tubuh Digital Buah
Safety Belt Buah
Peralatan P3K & Obat-Obatan Ls
ANALISA HARGA SATUAN
PEKERJAAN KUNCI DAN KACA
JDIH Kementrian PUPR 2022
6.17. 1 M2 Pasang Kaca, Tebal 5 mm
Kode Harga satuan Jumlah Harga
No Uraian Koefisien Satuan
Satuan (Rp) (Rp)
A TENAGA
Pekerja 0.015 OH 110,000.00 1,650.00
Tukang Kayu 0.150 OH 150,000.00 22,500.00
Kepala Tukang 0.015 OH 190,000.00 2,850.00
Mandor 0.008 OH 150,000.00 1,200.00
JUMLAH HARGA TENAGA 28,200.00
B BAHAN
Kaca, Tebal 5 mm 1.100 M2 225,000 247,500.00
Sealent 0.050 kg 25,000 1,250.00
JUMLAH HARGA BAHAN 248,750.00
C PERALATAN
-
-
JUMLAH HARGA ALAT -
D JUMLAH (A+B+C) 276,950.00
E Overhead dan Provit 15 % 41,542.50
F Harga Satuan Pekerjaan (D+E) 318,492.50