A. J U M L A H 87,273,904.15
B. PPN( 10 % x A ) 8,727,390.41
C. JUMLAH(A+B) 96,001,294.56
D. DIBULATKAN MENJADI 96,000,000.00
Mbay,……………….. 2019
Disetujui Oleh Konsultan Perencana
Pejabat Pembuat Komitmen CV.KARINDING PERDANA
Dinas Pariwisata Kab. Nagekeo T.A 2019
Mengetahui
Kepala Dinas Pariwisata Kab. Nagekeo
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.650 70,000.00 115,500.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 100,000.00 2,800.00
Mandor L.04 OH 0.083 100,000.00 8,300.00
JUMLAH TENAGA KERJA 147,225.00
B BAHAN
Semen Portland kg 326.000 1,800.00 586,800.00
Pasir Beton m3 0.760 191,000.00 145,160.00
Kerikil (Maks 30mm) m3 0.290 155,000.00 44,950.00
Air Liter 215.000 80.00 17,200.00
JUMLAH HARGA BAHAN 794,110.00
C Jumlah (A+B) 941,335.00
D Fee + Overhead 10% 94,133.50
E Jumlah (C+D) 1,035,468.50
A.4.4.2.26. Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1SP : 2PP.
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01.01 OH 0.300 70,000.00 21,000.00
Tukang Batu L.02.03 OH 0.150 75,000.00 11,250.00
Kepala Tukang L.03.01 OH 0.015 100,000.00 1,500.00
Mandor L.04.01 OH 0.015 100,000.00 1,500.00
JUMLAH TENAGA KERJA 35,250.00
B BAHAN
Semen portland Kg 6.340 1,800.00 11,412.00
Pasir Pasang m3 0.012 171,000.00 2,052.00
JUMLAH HARGA BAHAN 13,464.00
C PERALATAN -
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 48,714.00
E Overhead & Profit 10% 4,871.40
F Harga Satuan Pekerjaan (D+E) 53,585.40
A.4.6.1.20.Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas III uk.5/7
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.200 70,000.00 14,000.00
Tukang kayu L.03 OH 0.300 75,000.00 22,500.00
Kepala tukang L.03 OH 0.030 100,000.00 3,000.00
Mandor L.04 OH 0.010 100,000.00 1,000.00
JUMLAH TENAGA KERJA 40,500.00
B BAHAN
Kaso-kaso 5 x 7 cm m3 0.016 2,500,000.00 40,750.00
Paku 7 – 10 cm kg 0.250 27,000.00 6,750.00
JUMLAH HARGA BAHAN 47,500.00
C Jumlah (A+B) 88,000.00
D Fee + Overhead 10% 8,800.00
E Jumlah (C+D) 96,800.00
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 25) cm, kayu kelas I atau kelas II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.100 70,000.00 7,000.00
Tukang kayu L.03 OH 0.200 75,000.00 15,000.00
Kepala tukang L.03 OH 0.020 100,000.00 2,000.00
Mandor L.04 OH 0.005 100,000.00 500.00
JUMLAH TENAGA KERJA 24,500.00
B BAHAN
Papan kayu m3 0.008 4,962,400.00 37,218.00
Paku 5 dan 7 cm kg 0.050 27,000.00 1,350.00
JUMLAH HARGA BAHAN 38,568.00
C Jumlah (A+B) 63,068.00
D Fee + Overhead 10% 6,306.80
E Jumlah (C+D) 69,374.80
A.4.6.1.26. Pemasangan 1 m2 dinding dan lambrisering dari papan kayu kelas I dan II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang kayu L.03 OH 1.800 75,000.00 135,000.00
Kepala tukang L.03 OH 0.180 100,000.00 18,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 198,000.00
B BAHAN
Papan kayu 3/20cm m3 0.030 4,962,400.00 148,872.00
Paku 5 dan 10 kg 0.100 27,000.00 2,700.00
JUMLAH HARGA BAHAN 151,572.00
C Jumlah (A+B) 349,572.00
D Fee + Overhead 10% 34,957.20
E Jumlah (C+D) 384,529.20
Pemasangan 1 m2 lantai dari papan kayu kelas I dan II
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.600 70,000.00 42,000.00
Tukang kayu L.03 OH 1.800 75,000.00 135,000.00
Kepala tukang L.03 OH 0.180 100,000.00 18,000.00
Mandor L.04 OH 0.030 100,000.00 3,000.00
JUMLAH TENAGA KERJA 198,000.00
B BAHAN
Papan kayu /20cm m3 0.040 4,962,400.00 198,496.00
Paku 5 dan 10 kg 0.100 27,000.00 2,700.00
JUMLAH HARGA BAHAN 201,196.00
C Jumlah (A+B) 399,196.00
D Fee + Overhead 10% 39,919.60
E Jumlah (C+D) 439,115.60
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.070 70,000.00 4,900.00
Tukang cat L.02 OH 0.009 75,000.00 675.00
Kepala tukang L.03 OH 0.006 100,000.00 600.00
Mandor L.04 OH 0.003 100,000.00 300.00
JUMLAH TENAGA KERJA 6,475.00
B BAHAN
Cat menie Kg 0.200 55,000.00 11,000.00
Plamuur Kg 0.150 55,000.00 8,250.00
Cat dasar Kg 0.170 65,000.00 11,050.00
Cat penutup Kg 0.260 65,000.00 16,900.00
Kuas Bh 0.010 12,500.00 125.00
Pengencer Kg 0.030 48,000.00 1,440.00
Ampelas Lbr 0.200 16,000.00 3,200.00
JUMLAH HARGA BAHAN 51,965.00
C Jumlah (A+B) 58,440.00
D Fee + Overhead 10% 5,844.00
E Jumlah (C+D) 64,284.00
LA.04 Mobilisasi
LA.04.a Investigasi lapangan
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Akhli alat berat (ahli madya) L.08 OH 1.000 100,000.00 100,000.00
Pelaksana kegiatan (pemberi tugas) L.08 OH 1.000 100,000.00 100,000.00
Staf (kontraktor) L.08 OH 1.000 100,000.00 100,000.00
JUMLAH TENAGA KERJA 300,000.00
B BAHAN
- - -
- - -
JUMLAH HARGA BAHAN -
C Jumlah (A+B) 300,000.00
D Fee + Overhead 10% 30,000.00
E Jumlah (C+D) 330,000.00
LA.11.a.3) 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku balok kayu kelas I
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 3.300 70,000.00 231,000.00
Tukang L.02 OH 3.300 75,000.00 247,500.00
Kepala tukang L.03 OH 0.330 100,000.00 33,000.00
Mandor L.04 OH 0.165 100,000.00 16,500.00
JUMLAH TENAGA KERJA 528,000.00
B BAHAN
Besi Beugel: 0,005x0,05x500 Kg 73.13 16,000.00 1,170,000.00
Paku 7 – 12 cm Kg 1.200 27,000.00 32,400.00
Baut ø 12mm panjang 20cm Buah 1.000 34,000.00 34,000.00
Lem Kayu Kg 0.250 35,000.00 8,750.00
JUMLAH HARGA BAHAN 1,245,150.00
C Jumlah (A+B) 1,773,150.00
D Fee + Overhead 10% 177,315.00
E Jumlah (C+D) 1,950,465.00
LA.11.a.4) 1 m3 Membuat pasangan/konstruksi kayu dari bahan baku balok kayu Kelas II dan/atau III
Harga Jumlah
No Uraian Kode Satuan Koefisien Satuan Harga
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 2.800 70,000.00 196,000.00
Tukang L.02 OH 2.800 75,000.00 210,000.00
Kepala tukang L.03 OH 0.280 100,000.00 28,000.00
Mandor L.04 OH 0.140 100,000.00 14,000.00
JUMLAH TENAGA KERJA 448,000.00
B BAHAN
Paku 3 – 6 cm Kg 0.85 16,000.00 13,600.00
Paku 7 – 12 cm Kg 1.200 27,000.00 32,400.00
Lem Kayu Kg 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 81,000.00
C Jumlah (A+B) 529,000.00
D Fee + Overhead 10% 52,900.00
E Jumlah (C+D) 581,900.00
Harga Satuan
No. Peralatan Sat. Kode Dasar (HSD)
(Rp.)
1 2 3 4 5
Quary tanpa
No. Material Sat. Kode Pajak
(Rp.)
1 2 3 4 5
1 Batu Quary/Batu Gunung M3 M.010 155,000.00
2 Kerikil Galian Bukit M3 M.011 155,000.00
3 Kerikil Sungai Tak disaring M3 M.012 125,000.00
4 Kerikil Galian Tersaring M3 M.014 155,000.00
5 Kerikil Sungai Tersaring M3 M.0116 155,000.00
6 Batu Sungai M3 M.0117 155,000.00
7 Batu Belah 10 - 15 cm M3 M.020 155,000.00
8 Batu Belah 7 - 10 cm M3 M.021 155,000.00
9 Batu Belah 5 - 7 cm M3 M.022 155,000.00
10 Batu Belah 3 - 5 cm M3 M.023 155,000.00
11 Batu Belah 2 - 3 cm M3 M.024 155,000.00
12 Batu Belah 1 - 2 cm M3 M.025 155,000.00
13 Batu Belah 0.5 -1 cm M3 M.026 155,000.00
14 Timbunan Tanah Biasa M3 M.040 45,000.00
15 Pasir Beton M3 M.041 191,000.00
16 Timbunan Pilihan M3 M.050 82,000.00
17 Asphalt kg M.061 10,560.00
18 Asbuton Ton M.062 572,700.00
19 Minyak Fluks Ltr M.063 1,700.00
20 Minyak Bakar Ltr M.064 1,800.00
21 Semen (40 Kg) Zak M.065 72,000.00
22 Kapur Bakar M3 M.080 5,600.00
23 Baja Teralis kg M.081 40,000.00
24 Kawat Bronjong kg M.161 9,600.00
25 Baut Baja bh M.162 3,500.00
26 Besi Galvanis kg M.163 10,500.00
27 Paku Jembatan kg M.164 10,100.00
28 Besi Tulangan Beton kg M.166 11,750.00
29 Alat Bantu Set M.167 82,600.00
30 Minyak Diesel Ltr M.170 4,300.00
31 Bensin Ltr M.001 4,500.00
32 Minyak Pelumas Ltr M.002 7,100.00
33 Kayu Untuk perancah M3 M.003 1,500,000.00
34 Kayu Untuk Konst. Jembatan M3 M.180 3,500,000.00
35 Sirtu Tak diayak M3 M.181 58,500.00
36 Atap Alang-alang Pcs 25,000.00
37 Tali waru / goni m 5,000.00
38 Tripleks 3 mm lbr M.043 48,000.00
39 Tripleks 4 mm lbr 125,000.00
40 Tripleks 6 mm lbr 150,000.00
Quary tanpa
No. Material Sat. Kode Pajak
(Rp.)
1 2 3 4 5
41 Tripleks 9 mm lbr 180,000.00
42 Tripleks 12 mm lbr 200,000.00
Quary tanpa
No. Material Sat. Kode Pajak
(Rp.)
1 2 3 4 5
43 Pipa PVC dia. 3" M' 15,000.00
44 Pipa PVC dia. 4" M' 17,500.00
45 Besi Siku 70.70.7 M' 9,000.00
46 Bronjong Unit 300,000.00
47 Selected Material M3 -
48 Pasir Pasang M3 171,000.00
49 Semen Putih kg 5,500.00
50 Paku Biasa 5 s/d 15 cm kg 27,000.00
51 Paku Halus kg 41,000.00
52 Paku Seng kg 41,000.00
53 Paku Sekerup Dos 13,000.00
54 Menie Besi Kg 55,000.00
55 Menie Seng Kg 55,000.00
56 Menie Kayu Kg 55,000.00
57 Cat Kilap Kg 65,000.00
58 Minyak Cat Kg 48,000.00
59 Plamir Kayu Kg 55,000.00
60 Plamir Tembok Kg 55,000.00
61 Lem Aibon Kg 35,000.00
62 Tanah Urugan M3 45,000.00
63 Mateks tembok Kg 23,900.00
64 Kawat Beton Kg 34,000.00
65 Besi Beton 4 mm Kg 11,750.00
66 Besi Beton 6 mm Kg 11,750.00
67 Besi Beton 8 mm Kg 11,750.00
68 Besi Beton 10 mm Kg 11,750.00
69 Besi Beton 12 mm Kg 11,750.00
70 Besi Beton 16 mm Kg 11,750.00
71 Tegel Keramik 20 x 20 cm (kasar) M2 65,000.00
72 Tegel Keramik 20 x 20 cm (polos) M2 65,000.00
73 Tegel Keramik 30 x 30 cm (kasar) M2 65,000.00
74 Tegel Keramik 30 x 30 cm (polos) M2 65,000.00
75 Tegel Keramik 10 x 20 cm (Kasar) M2 65,000.00
76 Tegel Keramik 10 x 20 cm (polos) M2 65,000.00
77 Paving Block M2 123,750.00
78 Kuas Sedang 2,5 cm bh 7,500.00
79 Kuas Sedang 4 cm bh 12,500.00
80 Kuas Roll bh 35,000.00
81 Kunci Tanam 2 x Slaag bh 125,000.00
82 Hengsel Pintu bh 17,500.00
83 Hengsel Jendela bh 12,500.00
84 Haak Angin bh 10,500.00
85 Grendel Pintu bh 15,000.00
86 Grendel Jendela bh 15,000.00
87 Beugel U bulat 30 cm bh 17,500.00
88 Beugel U bulat 40 cm bh 18,500.00
89 Beugel U bulat 50 cm bh 19,500.00
90 Beugel U bulat 60 cm bh 20,000.00
91 Beugel U bulat 30 cm bh 8,500.00
92 Beugel U plat 30 cm bh 17,500.00
93 Beugel U plat 40 cm bh 18,500.00
94 Beugel U plat 50 cm bh 19,500.00
95 Beugel U plat 60 cm bh 20,000.00
96 Beugel plat 20 cm bh 8,000.00
97 Beugel plat 30 cm bh 12,500.00
98 Beugel plat 40 cm bh 15,000.00
99 Baut Mur 19mm p=25 cm bh 34,000.00
100 Teak wood 4 mm lbr 150,000.00
101 Tripleks 3 mm lbr 98,000.00
102 Seng Gelombang BJLS 0.28 lbr 72,000.00
103 Seng Plat BJLS 0.30 m 36,000.00
104 Kaca Polos 3 mm lbr 135,000.00
105 Kaca Polos 5 mm lbr 151,552.00
106 Bingkai Nako Psg 67,000.00
107 Kertas Gosok lbr 16,000.00
108 Semen Warna Kg 54,000.00
109 Teac Oil / Politur Ltr 55,000.00
110 Kloset Jongkok (INA) bh 225,000.00
111 Kloset Jongkok (LOLO) bh 575,000.00
112 Wastafel (INA) bh 250,000.00
Quary tanpa
No. Material Sat. Kode Pajak
(Rp.)
1 2 3 4 5
113 Rooster Kaca Bening bh 50,000.00
114 Bata Merah bh 1,200.00
115 List Plavond M' 7,500.00
116 List Kaca M' 1,250.00
117 Balok Klas I 8/12 Lokal M3 5,461,000.00
118 Balok Klas II 8/12 Lokal M3 4,500,000.00
119 Balok Klas I 7/15 Lokal M3 5,461,000.00
120 Balok Klas II 6/12 Lokal M3 4,500,000.00
121 Balok Klas II 5/7 Lokal M3 4,500,000.00
122 Balok Klas II 6/10 Lokal M3 4,500,000.00
123 Papan (4 cm) Klas I Lokal M3 5,461,000.00
124 Papan (4 cm) Klas II Lokal M3 4,500,000.00
125 Papan (2,5 cm) Klas I Lokal M3 5,461,000.00
126 Papan (2,5 cm) Klas II Lokal M3 4,500,000.00
127 Kayu Klas III M3 2,500,000.00
128 Pelupuh Lbr 7,500.00
129 Skrup Dos 10,000.00
130 Tripleks 4 mm Lbr 55,000.00
131 Tripleks 6 mm Lbr 92,000.00
132 Pipa listrik 5/8” btg 15,000.00
133 Kabel NYM 3x2,5 mm2 m 20,500.00
134 Tee Doos bh 5,000.00
135 L.Bow 5/8" bh 2,500.00
136 Las Dop bh 1,500.00
137 Klem Pipa Listrik bh 150.00
138 Mongkok (Listrik) bh 7,500.00
139 Fiting E 40 (Persolin) Keramik bh 55,000.00
140 Sealtape Listrik bh 15,000.00
141 Pipa Conduit M' 25,000.00
142 Socket Pipa bh 2,500.00
143 Fhiser bh
144 Lampu tiga jari philips 18 watt bh 22,500.00
145 Lampu tiga jari philips 24 watt bh 56,000.00
146 Lampu TL 20 Watt bh 150,000.00
147 Saklat Tunggal bh 25,000.00
148 Saklar Ganda bh 35,000.00
149 Triple Saklar bh 65,000.00
150 Stopk Kontak Titik 35,000.00
151 Sekring Box Unit 45,000.00
152 Papan Gibsun M 125,000.00
153 Tegel Porselin 11 x 11 cm M² 40,000.00
154 Kloset duduk Bh 350,000.00
155 Rel Jendela/Pintu Set 150,000.00
156 Roda Pengantar bh 50,000.00
157 Ijuk M2 150,000.00
158 Kramik 10 X 10 M2 40,000.00
159 Kayu Profil M1 12,500.00
160 Tegel PC Abu - abu M² 40,000.00
161 Seng Gelombang BJLS 0.28 lbr 75,000.00
162 Pipa PVC dia. 4" bh 55,000.00
163 Boog PVC 1/2 x 90 bh 9,800.00
164 Kopling GIP dia. 1/2" bh 77,000.00
165 Kran Air 1/2" bh 39,900.00
166 Reduser Tee GIP bh 13,090.00
167 Socket PVC 1/2" bh 9,100.00
168 Tee PVC 12 x 1/2" bh 17,500.00
169 Pipa Galvaniz 1" (Pipa hawa) M' 52,500.00
170 Isolasi bh 7,700.00
171 Lem PVC bh 133,000.00
172 Angker Besi bh 10,122.00
173 Bak Cuci Stainles Bh 120,000.00
174 Bak Air Fiber 0.30 m3 Bh 425,000.00
175 Pipa GIP dia. 1/2" m1 39,300.00
176 Pipa PVC dia. 2" m1 45,000.00
177 Socket 4" bh 24,100.00
178 L-Bov PVC 4" bh 68,700.00
179 Pipa Dia 1 1/2 " PVC Mtr 17,000.00
180 Socket PVC 1" bh 9,100.00
181 Socket GIP 1" bh 15,000.00
182 L Bog GIP 1 " bh 15,000.00
Quary tanpa
No. Material Sat. Kode Pajak
(Rp.)
1 2 3 4 5
183 Socket T PVC 1/2" bh 9,100.00
184 L Bog PVC 1/2 " bh 9,100.00
185 Socket T PVC 1-1/2" bh 9,100.00
186 Stop Kran 1/2" bh 39,900.00
187 Tegel Porselin 11 x 11 cm M² 58,900.00
188 Tegel PC Abu - abu M² 58,900.00
189 Pipa GIP dia. 4" bh 151,150.00
190 Boog PVC 1/2 x 90 bh 18,000.00
191 Kabel NYA Mtr 17,500.00
192 Socket PVC 1" bh 5,750.00
193 Talang PVC bh 25,000.00
194 L Bog GIP 1 " bh 9,500.00
195 Socket T PVC 1/2" bh 15,000.00
196 L Bog PVC 2 " bh 9,500.00
197 Socket T PVC 1-1/2" bh 15,000.00
198 Stop Kran 1/2" bh 35,000.00
DAFTAR HARGA SATUAN BAHAN/MATERIAL UTAMA
Catatan :
1. Semua Analisa yang menggunakan harga Bahan/Material Utama, harga satuan yang digunakan adalah Harga pada Daftar Harga
Satuan Bahan/Material Utama Bukan Harga pada Daftar Harga Satuan Upah dan Bahan.
2. Jumlah Harga Total pada Daftar Harga Satuan Bahan/Material Utama di dapat dari jumlah total dari Analisa Jarak Angkut
bahan/Material Utama.
ANALISA JARAK ANGKUT BAHAN/MATERIAL UTAMA
1. SEMEN
- Harga Semen di Mbay = 1,800.00 Per Kg
- Transpor Ke Lokasi = 38.69 Per Kg
- Ongkos bongkar muat = 6.60 Per Kg
Jumlah = 1,845.29 Per Kg
Susut 10 % = 184.53 Per Kg
Total = 2,029.82 Per Kg
Pembulatan = 2,000.00 Per Kg
ANALISA JARAK ANGKUT
- Ke Lokasi Pekerjaan a = 5.00 Km
- Jarak Angkut (PP = 2 a) b = 2.00 x 5.00 = 10.00 Km
- Kecepatan Rata-rata c = 30.00 Km/jam
- Lamanya waktu muat / Bongkar d = 0.75 Jam
- Waktu per trip e = 10.00 / 30.00 + 0.75 = 1.08 Jam
- Jumlah tiap trip per hari f = 7.00 / 1.08 = 6.46 Trip
- Kapasitas angkut per hari g = 3,000.00 Kg
- Biaya transport truck per hari h = 750,000.00 Rupiah
- Produksi per hari i = 6.46 x 3,000.00 = 19,384.62 Kg
- Ongkos angkut j = 750,000.00 / 19,384.62 = 38.69 Per Kg
- Analisa bongkar/muat dengan 4 pekerja k = 4.00 x 32,000.00 = 6.60 Per Kg
produksi per hari
2. PASIR PASANG
- Harga Pasir Pasang di lokasi = 171,000.00 Per M3
- Transpor Ke Lokasi = 4,960.32 Per M3
- Ongkos bongkar muat = 846.56 Per M3
- Retribusi Galian C = 5,500.00 Per M3
Jumlah = 182,306.88 Per M3
Susut 10 % = 18,230.69 Per M3
Total = 200,537.57 Per M3
Pembulatan = 200,500.00 Per M3
3. PASIR BETON
- Harga Pasir Pasang Beton di lokasi = 191,000.00 Per M3
- Transpor Ke Lokasi = 4,960.32 Per M3
- Ongkos bongkar muat = 846.56 Per M3
- Retribusi Galian C = 5,500.00 Per M3
Jumlah = 202,306.88 Per M3
Susut 10 % = 20,230.69 Per M3
Total = 222,537.57 Per M3
Pembulatan = 222,500.00 Per M3
ANALISA JARAK ANGKUT
- Ke Lokasi Pekerjaan a = 5.00 Km
- Jarak Angkut (PP = 2 a) b = 2.00 x 5.00 = 10.00 Km
- Kecepatan Rata-rata c = 30.00 Km/jam
- Lamanya waktu muat / Bongkar d = 0.50 Jam
- Waktu per trip e = 10.00 / 30.00 + 0.50 = 0.83 Jam
- Jumlah tiap trip per hari f = 7.00 / 0.83 = 8.40 Trip
- Kapasitas angkut per hari g = 18.00 M3
- Biaya transport truck per hari h = 750,000.00 Rupiah
- Produksi per hari i = 8.40 x 18.00 = 151.20 M3
- Ongkos angkut j = 750,000.00 / 151.20 = 4,960.32 Per M3
- Analisa bongkar/muat dengan 4 pekerja k = 4.00 x 32,000.00 = 846.56 Per M3
produksi per hari
4. BATU GUNUNG/SUNGAI
- Harga Batu Gunung/Sungai di lokasi = 155,000.00 Per M3
- Transpor Ke Lokasi = 4,960.32 Per M3
- Ongkos bongkar muat = 846.56 Per M3
- Retribusi Galian C = 5,500.00 Per M3
Jumlah = 166,306.88 Per M3
Susut 10 % = 16,630.69 Per M3
Total = 182,937.57 Per M3
Pembulatan = 182,900.00 Per M3
ANALISA JARAK ANGKUT
- Ke Lokasi Pekerjaan a = 5.00 Km
- Jarak Angkut (PP = 2 a) b = 2.00 x 5.00 = 10.00 Km
- Kecepatan Rata-rata c = 30.00 Km/jam
- Lamanya waktu muat / Bongkar d = 0.50 Jam
- Waktu per trip e = 10.00 / 30.00 + 0.50 = 0.83 Jam
- Jumlah tiap trip per hari f = 7.00 / 0.83 = 8.40 Trip
- Kapasitas angkut per hari g = 18.00 M3
- Biaya transport truck per hari h = 750,000.00 Rupiah
- Produksi per hari i = 8.40 x 18.00 = 151.20 M3
- Ongkos angkut j = 750,000.00 / 151.20 = 4,960.32 Per M3
- Analisa bongkar/muat dengan 4 pekerja k = 4.00 x 32,000.00 = 846.56 Per M3
produksi per hari
15. TEAKWOOD 4 MM
- Harga Tripleks 4 mm di lokasi = 150,000.00 Per Lbr
- Transpor Ke Lokasi = 178.57 Per Lbr
- Ongkos bongkar muat = 30.48 Per Lbr
Jumlah = 150,209.05 Per Lbr
Susut 10 % = 15,020.90 Per Lbr
Total = 165,229.95 Per Lbr
Pembulatan = 165,200.00 Per Lbr
16. Tripleks 9 mm
- Harga Tripleks 9 mm di lokasi = 180,000.00 Per Lbr
- Transpor Ke Lokasi = 0.12 Per Lbr
- Ongkos bongkar muat = 4.00 Per Lbr
Jumlah = 180,004.12 Per Lbr
Susut 10 % = 18,000.41 Per Lbr
Total = 198,004.53 Per Lbr
Pembulatan = 198,000.00 Per Lbr
I. PEKERJAAN PERSIAPAN
1 Administrasi dan Dokumentasi
2 Pek. Pembersihan Lokasi dan Removal
3 Pek. Pengukuran dan Pemasangan Bowplank
4 Penyediaan Air Kerja
5 Mobilisasi Dan Demobilisasi Pekerjaa
6 Direksi Keet
7 Papan Nama Proyek
Balok Tekan
Balok Tarik
Papan Apit
Schore
X. PEK. ELECTRICAL
1 Penyambungan Listrik PLN 2400 watt
2 Memasang Instalasi Penerangan
3 Pemasangan buah titik lampu
4 Pemasangan Lampu SL 25 Watt
5 Pemasangan MCB 20 Ampere
6 Pemasangan Stop Kontak
7 Pemasangan Sakelar Tunggal
8 Pemasangan Sakelar Ganda
20 20 400
30
21.31
21.31
19.75
19.75
19.42
19.42
10.05
10.05
141.05
Volume Luas p l1 l2 l3
A Dia 25 cm 13.58 4.320
B 7/10 0.338 16.435 1.511 0.100 0.100 0.070
B1 7/10 0.139 6.746 0.620 0.100 0.100 0.070
C 7/10 0.210 10.195 0.937 0.100 0.100 0.070
D 7/10 0.101 4.886 0.449 0.100 0.100 0.070
0.788 51.839
Meja