Anda di halaman 1dari 15

DAFTAR KUANTITAS DAN HARGA

SATUAN KERJA : BALAI PELESTARIAN NILAI BUDAYA


PEKERJAAN : PEMASANGAN PAVING BLOCK
LOKASI : MANADO
TAHUN ANGGARAN : 2013

HARGA JUMLAH
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp.) (Rp.)
1 2 3 4 5 6

A. PEKERJAAN PERSIAPAN
1 Pengukuran Dan Pembersihan LS 1.00 1,000,000.00 1,000,000.00

A. PEKERJAAN TANAH 3,040,815.05


3. Urugan Pasir M3 6.82 205,000.00 1,397,997.50
4. Urugan Sirtu M3 6.82 199,900.00 1,363,218.05
5. Pemadatan M3 13.64 20,500.00 279,599.50

B. PEKERJAAN PAVING BLOCK 31,274,820.00


1 Paving Block Bh 6820 2,500.00 17,048,750.00
2 Cansteen Bh 297 12,500.00 3,706,250.00
3. Pemasangan Paving Block M2 136.39 38,000.00 5,182,820.00
4. Pengecoran Cansteen Beton M' 59.30 90,000.00 5,337,000.00

C. PEKERJAAN LAIN-LAIN 1,000,000.00


1. Pembersihan Dan Dokumentasi Ls 1.00 1,000,000.00 1,000,000.00

SUB TOTAL 36,315,635.05


PPN 10 % 3,631,563.51
TOTAL 39,947,198.56
DIBULATKAN 39,947,000.00

TERBILANG :
SERATUS LIMA PULUH DUA JUTA DELAPAN RATUS DELAPAN PULUH RIBU RUPIAH

Manado, Agustus 2013

Mengetahui,
CV. RIOREN

JOHNY R. ROSANG
Direktur
JADWAL WAKTU PELAKSANAAN/SKEMA KERJA KURVA "S
SATUAN KERJA : BALAI PELESTARIAN NILAI BUDAYA
PEKERJAAN : PEMASANGAN PAVING BLOCK
LOKASI : MANADO
TAHUN ANGGARAN : 2013

BULAN
NO URAIAN BOBOT I
1 2 3

A. PEKERJAAN TANAH

1. #NAME? #NAME? #NAME? #NAME?

2. Urugan Pasir 3.85 1.28

3. Urugan Sirtu 3.75 1.88 1.88

4. Pemadatan 0.77 0.26 0.26

B. PEKERJAAN PAVING BLOCK

1. Pemasangan Paving Block 14.27 2.85

2. Pengecoran Cansteen Beton 14.70

C. PEKERJAAN LAIN-LAIN

1. Pembersihan Dan Dokumentasi 2.75

TOTAL PEKERJAAN #NAME?

RENCANA PEKERJAAN #NAME? 6.27

RENCANA KUMULATIF PEKERJAAN #NAME? #NAME? #NAME?

Mengetahui,
CV. RIOREN

JOHNY R. ROSANG
Direktur
LAKSANAAN/SKEMA KERJA KURVA "S"

BULAN
I II % Ket.
4 1 2 3 4

100

1.28 1.28

.Jangka Waktu Pelaksanaan 60 HKL


0.26

2.85 2.85 2.85 2.85

3.67 3.67 3.67 3.67

0.92 0.92 0.92 0

8.07 7.81 7.45 7.45 0.92

#NAME? #NAME? #NAME? #NAME? #NAME?

Manado, Agustus 2013

#NAME?

#NAME?
#NAME?
SKEMA WAKTU PEMASUKAN BAHAN
SATUAN KERJA BALAI PELESTARIAN NILAI BUDAYA
PEKERJAAN PEMASANGAN PAVING BLOCK
LOKASI MANADO
TAHUN ANGGARAN 2013

BULAN I
No. JENIS BAHAN
1 2 3 4

1 Pasir
2 Sirtu
3 Paving Block
4 Kerikil
5 Pipa Galvanis
6 Semen
7 Paku
8 Kayu Kls III
9 Cansteen

Menyetujui,
CV. RIOREN

JOHNY R. ROSANG
Direktur

SKEMA PENGERAHAN TENAGA


SATUAN KERJA BALAI PELESTARIAN NILAI BUDAYA
PEKERJAAN PEMASANGAN PAVING BLOCK
LOKASI MANADO
TAHUN ANGGARAN 2013

BULAN I
No. JENIS BAHAN
1 2 3 4

1 PEKERJA

2 MANDOR

3 TUKANG BATU
4 KEPALA TUKANG

Menyetujui,
CV. RIOREN

JOHNY R. ROSANG
Direktur

SKEMA PENGGUNAAN PERALATAN / MESIN


SATUAN KERJA BALAI PELESTARIAN NILAI BUDAYA
PEKERJAAN PEMASANGAN PAVING BLOCK
LOKASI MANADO
TAHUN ANGGARAN 2013

BULAN I
No. JENIS ALAT
1 2 3 4

1. Dump Truck

2 Water Pass / Theodolit

3 Stamper

4 Molen / Concrete Mixer

5 Concrete Vibrator

6 Alat Pertukangan

Menyetujui,
CV. RIOREN

JOHNY R. ROSANG
Direktur
AKTU PEMASUKAN BAHAN

BULAN II
KETERANGAN
1 2 3 4

Jangka Waktu
120 HKL

Jangka Waktu
Pemeliharaan
180 HKL

Manado, Agustus 2013

#NAME?

#NAME?
#NAME?

A PENGERAHAN TENAGA

BULAN II
KET.
1 2 3 4

Jangka Waktu
Pelaksanaan
120 HKL
Manado, Agustus 2013

#NAME?

#NAME?
#NAME?

GUNAAN PERALATAN / MESIN

BULAN II
KET.
1 2 3 4

Jangka Waktu
Pelaksanaan
120 HKL

Manado, Agustus 2013

#NAME?

#NAME?
#NAME?
ANALISA HARGA SATUAN PEKERJAAN UTAMA

SATUAN KERJA : BALAI PELESTARIAN NILAI BUDAYA


PEKERJAAN : PEMASANGAN PAVING BLOCK
LOKASI : MANADO
TAHUN ANGGARAN : 2013

JENIS PEKERJAAN
NO. HARGA SATUAN HARGA ANALISA
KOEF SAT ITEM

1. 1 M3 PEK. GALIAN TANAH BIASA


0.384 Org/Hr Pekerja Rp 35,000.00 Rp 13,440.00
0.019 Org/Hr Mandor Rp 45,000.00 Rp 855.00
Rp 14,295.00
2. 1 M3 PEK. PEMADATAN
0.500 Org/Hr Pekerja Rp 35,000.00 Rp 17,500.00
0.050 Org/Hr Mandor Rp 45,000.00 Rp 2,250.00
Rp 19,750.00
3. 1 M3 PEK. URUGAN PASIR
1.200 m3 Pasir Urug Rp 110,000.00 Rp 132,000.00
0.300 Org/Hr Pekerja Rp 35,000.00 Rp 10,500.00
0.010 Org/Hr Mandor Rp 45,000.00 Rp 450.00
Rp 142,950.00
4. 1 M3 PEK. URUGAN SIRTU
1.200 m3 Sirtu Rp 75,000.00 Rp 90,000.00
0.250 Org/Hr Pekerja Rp 35,000.00 Rp 8,750.00
0.025 Org/Hr Mandor Rp 45,000.00 Rp 1,125.00
Rp 99,875.00

5. 1 M2 PAS. PAVING BLOCK


43.000 bh Paving Block 6 Cm Rp 2,000.00 Rp 86,000.00
0.500 Org/Hr Pekerja Rp 35,000.00 Rp 17,500.00
0.025 Org/Hr Mandor Rp 45,000.00 Rp 1,125.00
1.000 unit Alat bantu Rp 10,000.00 Rp 10,000.00
Rp 114,625.00
6. 1 M' PAS. CANSTEEN
2.000 bh Cansteen Rp 75,000.00 Rp 150,000.00
0.500 Org/Hr Pekerja Rp 35,000.00 Rp 17,500.00
0.025 Org/Hr Mandor Rp 45,000.00 Rp 1,125.00
1.000 unit Alat bantu Rp 10,000.00 Rp 10,000.00
Rp 178,625.00

Manado, Agustus 2013


Menyetujui,
CV. RIOREN Dibuat Oleh,

JOHNY R. ROSANG #NAME?


Direktur Pimpinan Teknik
DAFTAR HARGA SATUAN JADI PEKERJAAN
SATUAN KERJA : BALAI PELESTARIAN NILAI BUDAYA
PEKERJAAN : PEMASANGAN PAVING BLOCK
LOKASI : MANADO
TAHUN ANGGARAN : 2013

HARGA SATUAN
NO URAIAN PEKERJAAN SATUAN
(Rp)

1 PEK. GALIAN TANAH BIASA M3 Rp 14,295.00

2 PEK. PEMADATAN M3 Rp 19,750.00

3 PEK. URUGAN PASIR M3 Rp 142,950.00

4 PEK. URUGAN SIRTU M3 Rp 99,875.00


5 PAS. PAVING BLOCK M2 Rp 114,625.00

6 PAS. CANSTEEN M' Rp 178,625.00

Manado, Agustus 2013

Mengetahui, #NAME?
CV. RIOREN

JOHNY R. ROSANG #NAME?


Direktur #NAME?
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT

SATUAN KERJA : BALAI PELESTARIAN NILAI BUDAYA


PEKERJAAN : PEMASANGAN PAVING BLOCK
LOKASI : MANADO
TAHUN ANGGARAN : 2013

HARGA SATUAN
NO. ITEM SAT
1 2 3 4

1 Mandor org.hari Rp 45,000.00


2 Kepala Tukang org.hari Rp 70,000.00
3 Tukang Batu org.hari Rp 50,000.00
4 Tukang Kayu org.hari Rp 55,000.00
5 Tukang Besi / Tukang Pipa org.hari Rp 50,000.00
6 Tukang Cat org.hari Rp 50,000.00
7 Tukang Las org.hari Rp 55,000.00
8 Tukang Listrik org.hari Rp 50,000.00
9 Pekerja org.hari Rp 35,000.00

DAFTAR HARGA BAHAN

HARGA SATUAN
NO. ITEM SAT
1 2 3 4

1 Paving Block bh Rp 2,000.00


2 Cansteen bh Rp 75,000.00
3 Kerikil Saring/Beton m3 Rp 175,000.00
4 Kapur pasangan/Batu m3 Rp 95,000.00
5 Pasir pasangan m3 Rp 115,000.00
6 Pasir beton m3 Rp 110,000.00
7 Pasir Urug m3 Rp 110,000.00
8 Sirtu m3 Rp 115,000.00
9 Tanah Timbunan m3 Rp 75,000.00
10 Semen PC kg Rp 1,140.00
11 Kayu kls III (Papan) m3 Rp 1,600,000.00
12 Kayu kls III (Balok) m3 Rp 1,600,000.00
13 Paku biasa kg Rp 12,000.00

Manado, Agustus 2013


Menyetujui,
CV. RIOREN Dibuat Oleh,
HARGA SATUAN
NO. ITEM SAT

JOHNY R. ROSANG #NAME?


Direktur Pimpinan Teknik
REKAPITULASI HARGA PENAWARAN
SATUAN KERJA : BALAI PELESTARIAN NILAI BUDAYA
PEKERJAAN : PEMASANGAN PAVING BLOCK
LOKASI : MANADO
TAHUN ANGGARAN : 2013

JUMLAH
NO. URAIAN PEKERJAAN HARGA
(Rp.)
1 2 3
A. PEKERJAAN PERSIAPAN 1,000,000

B. PEKERJAAN TANAH 3,040,815.05

C. PEKERJAAN PAVING BLOCK 31,274,820.00

D. PEKERJAAN LAIN-LAIN 1,000,000.00

JUMLAH BIAYA KONSTRUKSI 36,315,635.05


PAJAK PERTAMBAHAN NILAI (PPN) 10.0 % 3,631,563.51
TOTAL 39,947,198.56
DIBULATKAN 39,947,000.00

TERBILANG :
SERATUS LIMA PULUH DUA JUTA DELAPAN RATUS DELAPAN PULUH RIBU RUPIAH

Manado, Agustus 2013

Menyetujui,
CV. RIOREN

JOHNY R. ROSANG
Direktur
Nomor : 16/CV.R/VII/2010 Manado, Agustus 2013
Lampiran : 1 (satu) berkas)

Kepada Yth.
PEJABAT PEMBUAT KOMITMEN (PPK)
BALAI PENELITIAN KEHUTANAN MANADO
di
Manado

Perihal : Penawaran Pelelangan Umum Pekerjaan Lapangan Parkir/Paving Block dan


Tiang Bendera Balai Penelitian Kehutanan Manado

Sehubungan dengan Undangan Pelelangan No. : UN.04/BPKMND/PAN/2010 tanggal 18 Juni 2010, setelah
kami mempelajari dengan seksama dokumen lelang termasuk Berita Acara Penjelasan dan Adendumnya,
dengan ini kami mengajukan Penawaran untuk Pekerjaan Lapangan Parkir/Paving Block dan Tiang Bendera
Sebesar Rp. 148,493,000,00 (Seratus Empat Puluh Delapan Juta Empat Ratus Sembilan Puluh Tiga Ribu
Rupiah).
Dalam Penawaran ini sudah termasuk pengadaan tenaga kerja, bahan, peralatan, biaya umum dan
keuntungan, dan semua kewajiban pajak untuk melaksanakan pekerjaan tersebut di atas.

Jangka waktu pelaksanaan pekerjaan selama 60 (enam puluh) hari kalender sesuai dengan yang tercantum
dalam Surat Perintah Mulai Kerja

Penawaran ini berlaku selama 45 (empat puluh lima) hari kalender sejak pembukaan penawaran.
Kami akan tunduk pada semua ketentuan yang tercantum dalam dokumen lelang, sesuai dengan persyaratan
dokumen lelang, bersama surat penawaran ini kami lampirkan :

1. Jaminan Penawaran, asli dan 2 (dua) berkas rekaman;

2. Daftar Kuantitas dan Harga, asli dan 2 (dua) berkas rekaman;

3. Analisa Harga Satuan Pekerjaan Utama, asli dan 2 (dua) berkas rekaman;
4. Daftar Upah, asli dan 2 (dua) berkas rekaman;

5. Metode Pelaksanaan, asli dan 2 (dua) berkas rekaman;

6. Jadual Waktu Pelaksanaan, asli dan 2 (dua) berkas rekaman;

7. Daftar Peralatan Utama, asli dan 2 (dua) berkas rekaman;

8. Bagian Pekerjaan yang disubkontrakkan, asli dan 2 (dua) berkas rekaman;

9. Data Isian/penilaian kualifikasi

Penawar

CV. RIOREN

JOHNY R. ROSANG
Direktur
FORMULIR CAPAIAN TINGKAT KOMPONEN DALAM NEGERI
BARANG DAN JASA PRODUKSI DALAM NEGERI
UNTUK ANALISA HARGA SATUAN

Nama Penyedia Barang / Jasa : CV. RIOREN


Alamat : Jl. 14 Februari Teling Atas Ling. II Manado
Pekerjaan : Pembangunan Gedung Perpustakaan
Lokasi : Manado
Tahun Anggaran : 2010

Biaya per 1 (satu) satuan produk


NO. URAIAN PEKERJAAN Biaya KDN Biaya KLN Jumlah % KDN % TKDN
(Rp) (Rp) (Rp) Gabungan
1 2 3 4 5 6 7
I Bahan (Material)

Sub Jumlah I

II Tenaga Kerja Langsung

Sub Jumlah II

III Biaya Tidak Langsung

(Factory Overhead)

Sub Jumlah III


JUMLAH (I + II + III)

Manado, Agustus 2013

#REF!

#REF!
DIREKTUR
BAGIAN PEKERJAAN YANG DISUBKONTRAKKAN
PEKERJAAN : PEMASANGAN PAVING BLOCK
LOKASI : MANADO

PERSENTASE PERSENTASE
NO.MATA DARI HARGA NAMA
JENIS PEKERJAAN DARI HARGA
PEMBAYARAN TOTAL MATA SUBKONTRAKTOR
PENAWARAN (%)
PENAWARAN (%)

#REF! ### 60.00 #NAME? CV. JIM'S

#REF! ### 60.00 CV. JIM'S

#REF! ### 10.00 4.76 CV. JIM'S

#REF! ### 60.00 #NAME? CV. JIM'S

TOTAL (%) #NAME?

Manado, Agustus 2013

Menyetujui, #NAME?
CV. RIOREN

JOHNY R. ROSANG #NAME?


Direktur #NAME?

Anda mungkin juga menyukai