1 A.4.1.1.1 1 m3 Membuat 1 m3 Beton mutu f' c = 7,4 Mpa, slump ( 12 ± 2 ) cm, w/c = 0,87 1,071,088.07
2 A.4.1.1.6 1 m3 Membuat 1 m3 beton mutu f' c = 16,9 Mpa ( K 200 ), slump ( 12 ± 2 ) cm, w/c = 0,56 1,223,255.03
3 A.4.1.1.20 1 m2 Memasang 1 m2 bekisting untuk pondasi 122,639.00
A.4.4.2 SATUAN PEKERJAAN PLESTERAN
#NAME? #NAME?
REKAPITULASI
RENCANA ANGGARAN BIAYA
1 2 3
JUMLAH 511,387,262.14
PPn 10% 51,138,726.21
JUMLAH TOTAL 562,525,988.36
DIBULATKAN 562,500,000.00
Terbilang :
Lima Ratus Enam Puluh Dua Juta Lima Ratus Ribu Rupiah
PENAWAR :
CV. ANUGRAH MULIA PRATAMA
IDRUS
DIREKTUR
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
No URAIAN PEKERJAAN SAT VOL HARGA SATUAN (Rp.) JUMLAH HARGA (Rp.)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pek. Pembongkaran ls 1.00 2,500,000.00 2,500,000.00
2 Mobilisasi Peralatan dan Bahan ls 1.00 500,000.00 500,000.00
3 Pembuatan Gudang + Direksi Keet m 2
5.00 881,650.00 4,408,250.00
4 Papan Nama Proyek ls 1.00 300,000.00 300,000.00
5 Iuran BPJS Ketenagakerjaan ls 1.00 1,068,200.00 1,068,200.00
JUMLAH HARGA PEKERJAAN PERSIAPAN 8,776,450.00
II PERBAIKAN PONDASI KOLOM & DINDING TANGGA
1 Penggantian Closet Duduk, ex TOTO (Rg. Kepala Badan) unit 1.00 4,626,215.00 4,626,215.00
2 Adminstrasi Pelaporan dan Dokumentasi ls 1.00 2,500,000.00 2,500,000.00
3 Pembersihan ls 1.00 1,000,000.00 1,000,000.00
C PERALATAN
A.4.1.1.1 Membuat 1 m3 Beton mutu f' c = 7,4 Mpa, slump ( 12 ± 2 ) cm, w/c = 0,87
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 1.650 75,000.00 123,750.00
Tukang batu L.02 Oh 0.275 115,000.00 31,625.00
Kepala tukang L.03 Oh 0.028 125,000.00 3,500.00
Mandor L.04 Oh 0.083 90,000.00 7,470.00
JUMLAH TENAGA KERJA 166,345.00
B BAHAN
Semen PC kg 247.000 1,500.00 370,500.00
Pasir beton kg 869.000 196.43 170,696.43
Krikil (max. 30 mm ) kg 999.000 248.15 247,900.00
Air ltr 215.000 85.00 18,275.00
JUMLAH HARGA BAHAN 807,371.43
C PERALATAN
A.4.1.1.6 Membuat 1 m3 beton mutu f' c = 16,9 Mpa ( K 200 ), slump ( 12 ± 2 ) cm, w/c = 0,56
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 1.650 75,000.00 123,750.00
Tukang batu L.02 Oh 0.275 115,000.00 31,625.00
Kepala tukang L.03 Oh 0.028 125,000.00 3,500.00
Mandor L.04 Oh 0.083 90,000.00 7,470.00
JUMLAH TENAGA KERJA 166,345.00
B BAHAN
Semen PC kg 352.000 1,500.00 528,000.00
Pasir beton kg 731.000 196.43 143,589.29
Krikil (max. 30 mm ) kg 1,031.000 248.15 255,840.74
Air ltr 215.000 85.00 18,275.00
JUMLAH HARGA BAHAN 945,705.03
C PERALATAN
JUMLAH HARGA PERALATAN
D. Jumlah ( A + B + C ) 1,112,050.03
E. Overheead & Profit 10% x D 111,205.00
F. Harga Satuan Pekerjaan 1,223,255.03
5 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.1.1.17.b Pembesian 10kg dengan besi polos atau besi ulir (dia. 10 mm)
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0700 75,000.00 5,250.00
Tukang besi L.02 Oh 0.0700 115,000.00 8,050.00
Kepala tukang L.03 Oh 0.0070 125,000.00 875.00
Mandor L.04 Oh 0.0040 90,000.00 360.00
JUMLAH TENAGA KERJA 14,535.00
B BAHAN
Besi beton polos dia. 10 mm kg 10.5000 12,000.00 126,000.00
Kawat beton kg 0.1500 25,000.00 3,750.00
JUMLAH HARGA BAHAN 129,750.00
C PERALATAN
JUMLAH HARGA PERALATAN
D. Jumlah ( A + B + C ) 144,285.00
E. Overheead & Profit 10% x D 14,428.50
F. Harga Satuan Pekerjaan Per 10 kg 158,713.50
Per 1 kg 15,871.35
A.4.2.1.21 Pemasangan 1 m2 rangka plafond besi hollow galvalum 40.40.2 mm, modul 60x60 cm
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.3500 75,000.00 26,250.00
Tukang besi L.02 Oh 0.3500 115,000.00 40,250.00
Kepala tukang L.03 Oh 0.0350 125,000.00 4,375.00
Mandor L.04 Oh 0.0180 90,000.00 1,620.00
JUMLAH TENAGA KERJA 72,495.00
B BAHAN
Hollow 40.40.2 mm m' 4.0000 22,500.00 90,000.00
Aksesories % 100.0000 22,500.00 22,500.00
JUMLAH HARGA BAHAN 112,500.00
C PERALATAN
6 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.2.1.23 Pemasangan 1 m2 atap jurai rangka atap baja canai dingin
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.734 75,000.00 55,050.00
Tukang besi L.02 Oh 0.734 115,000.00 84,410.00
Kepala tukang L.03 Oh 0.073 125,000.00 9,125.00
Mandor L.04 Oh 0.037 90,000.00 3,330.00
JUMLAH TENAGA KERJA 151,915.00
B BAHAN
Baja ringan canai dingin kg 4.0500 15,503.88 62,790.70
7 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
8 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.5.2 SATUAN PEKERJAAN PENUTUP ATAP
9 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.6.1 SATUAN PEKERJAAN KAYU
A.4.6.1.2 Pembuatan dan Pemasangan 1m3 kusen pintu dan kusen jendela kayu klas II atau III
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 6.0000 75,000.00 450,000.00
Tukang kayu L.02 Oh 18.0000 115,000.00 2,070,000.00
Kepala tukang L.03 Oh 1.8000 125,000.00 225,000.00
Mandor L.04 Oh 0.3000 90,000.00 27,000.00
JUMLAH TENAGA KERJA 2,772,000.00
B BAHAN
Balok kayu klas II m3 1.2000 1,900,000.00 2,280,000.00
Paku 10 cm kg 1.2500 20,000.00 25,000.00
Lem kayu kg 1.0000 18,000.00 18,000.00
JUMLAH HARGA BAHAN 2,323,000.00
C PERALATAN
A.4.6.1.6 Pembuatan dan Pemasangan 1m2 daun pintu dan daun jendela kaca, kayu klas II atau III
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.8000 75,000.00 60,000.00
Tukang kayu L.02 Oh 2.4000 115,000.00 276,000.00
Kepala tukang L.03 Oh 0.2400 125,000.00 30,000.00
Mandor L.04 Oh 0.0400 90,000.00 3,600.00
JUMLAH TENAGA KERJA 369,600.00
B BAHAN
Papan kayu klas II m3 0.0240 1,900,000.00 45,600.00
Lem kayu kg 0.3000 18,000.00 5,400.00
JUMLAH HARGA BAHAN 51,000.00
C PERALATAN
A.4.6.1.5 Pembuatan dan pemasangan 1m2 daun pintu panil lapis alumunium kulit jeruk, rangka kayu klas II atau III
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 1.0000 75,000.00 75,000.00
Tukang kayu L.02 Oh 3.0000 115,000.00 345,000.00
Kepala tukang L.03 Oh 0.3000 125,000.00 37,500.00
Mandor L.04 Oh 0.0500 90,000.00 4,500.00
JUMLAH TENAGA KERJA 462,000.00
B BAHAN
Papan kayu klas II m3 0.0400 1,900,000.00 76,000.00
Lem Kayu kg 0.5000 18,000.00 9,000.00
Tripleks lapis kulit jeruk, 90x220 cm lbr 0.5000 115,000.00 57,500.00
JUMLAH HARGA BAHAN 142,500.00
C PERALATAN
10 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.6.1.21 Pemasangan 1 m' lisplank ukuran (3x20) cm, kayu klas II
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.1000 75,000.00 7,500.00
Tukang kayu L.02 Oh 0.2000 115,000.00 23,000.00
Kepala tukang L.03 Oh 0.0200 125,000.00 2,500.00
Mandor L.04 Oh 0.0050 90,000.00 450.00
JUMLAH TENAGA KERJA 33,450.00
B BAHAN
Papan kayu klas II m3 0.0400 1,900,000.00 76,000.00
Paku 5 dan 7 cm kg 0.1000 20,000.00 2,000.00
JUMLAH HARGA BAHAN 78,000.00
C PERALATAN
11 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.6.2.5.a Pemasangan 1 buah engsel pintu
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.1500 75,000.00 11,250.00
Tukang kayu L.02 Oh 0.1500 115,000.00 17,250.00
Kepala tukang L.03 Oh 0.0150 125,000.00 1,875.00
Mandor L.04 Oh 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 30,447.00
B BAHAN
Engsel Pintu bh 1.0000 31,000.00 31,000.00
JUMLAH HARGA BAHAN 31,000.00
C PERALATAN
12 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.6.2.17 Pemasangan 1 m2 kaca polos tebal 5 mm
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0150 75,000.00 1,125.00
Tukang kaca L.02 Oh 0.1500 115,000.00 17,250.00
Kepala tukang L.03 Oh 0.0150 125,000.00 1,875.00
Mandor L.04 Oh 0.0008 90,000.00 72.00
JUMLAH TENAGA KERJA 20,322.00
B BAHAN
Kaca rayban 5 mm m2 1.1000 195,000.00 214,500.00
Sealent kg 0.0500 25,000.00 1,250.00
JUMLAH HARGA BAHAN 215,750.00
C PERALATAN
A.4.7.1.4 Pengecatan 1 m2 bidang kayu baru ( 1 lapis plamur, 1 lapis cat dasar, dan 2 lapis cat penutup ),
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0700 75,000.00 5,250.00
Tukang cat L.02 Oh 0.0090 115,000.00 1,035.00
Kepala tukang L.03 Oh 0.0060 125,000.00 750.00
Mandor L.04 Oh 0.0030 90,000.00 270.00
JUMLAH TENAGA KERJA 7,305.00
B BAHAN
Cat menie kg 0.2000 55,000.00 11,000.00
Plamur kg 0.1500 65,000.00 9,750.00
Cat dasar, kg 0.1700 60,000.00 10,200.00
Cat penutup, ex. Avian kg 0.2600 60,000.00 15,600.00
Kuas bh 0.0100 8,500.00 85.00
Pengencer kg 0.0300 25,000.00 750.00
Amplas lbr 0.2000 17,000.00 3,400.00
JUMLAH HARGA BAHAN 50,785.00
C PERALATAN
13 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.4.7.1.10 Pengecatan 1 m2 bidang tembok baru ( 1 lapis plamur, 1 lapis cat dasar, dan 2 lapis cat penutup ), Interior
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0200 75,000.00 1,500.00
Tukang cat L.02 Oh 0.0630 115,000.00 7,245.00
Kepala tukang L.03 Oh 0.0063 125,000.00 787.50
Mandor L.04 Oh 0.0030 90,000.00 270.00
JUMLAH TENAGA KERJA 9,802.50
B BAHAN
Plamur kg 0.1000 12,000.00 1,200.00
Cat dasar kg 0.1000 61,000.00 6,100.00
Cat penutup ex. Dulux Pentalite Interior kg 0.2600 61,000.00 15,860.00
JUMLAH HARGA BAHAN 23,160.00
C PERALATAN
A.4.7.1.11 Pengecatan 1 m2 bidang tembok lama ( 1 lapis cat dasar, dan 2 lapis cat penutup )
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0280 75,000.00 2,100.00
Tukang cat L.02 Oh 0.0420 115,000.00 4,830.00
Kepala tukang L.03 Oh 0.0042 125,000.00 525.00
Mandor L.04 Oh 0.0030 90,000.00 270.00
JUMLAH TENAGA KERJA 7,725.00
B BAHAN
Cat dasar kg 0.1200 61,000.00 7,320.00
Cat penutup ex. Dulux Pentalite Interior kg 0.1800 61,000.00 10,980.00
JUMLAH HARGA BAHAN 18,300.00
C PERALATAN
A.4.7.1.11 Pengecatan 1 m2 bidang plafond tripleks ( 1 lapis cat dasar, dan 2 lapis cat penutup )
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 0.0280 75,000.00 2,100.00
Tukang cat L.02 Oh 0.0420 115,000.00 4,830.00
Kepala tukang L.03 Oh 0.0042 125,000.00 525.00
Mandor L.04 Oh 0.0030 90,000.00 270.00
JUMLAH TENAGA KERJA 7,725.00
B BAHAN
Cat dasar kg 0.1200 20,000.00 2,400.00
Cat penutup ex. Dulux Pentalite Interior kg 0.1800 20,000.00 3,600.00
JUMLAH HARGA BAHAN 6,000.00
C PERALATAN
14 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
A.5.1.1.1 Pemasangan 1 bh closet duduk monoblock
No. Uraian Kode Satuan Koefesien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A TENAGA
Pekerja L.01 Oh 3.3000 75,000.00 247,500.00
Tukang cat L.02 Oh 1.1000 115,000.00 126,500.00
Kepala tukang L.03 Oh 0.0100 125,000.00 1,250.00
Mandor L.04 Oh 0.1600 90,000.00 14,400.00
JUMLAH TENAGA KERJA 389,650.00
B BAHAN
Kloset Duduk, ex. TOTO type Close Couple set 1.0000 3,600,000.00 3,600,000.00
Perlengkapan % 6.0000 216,000.00 216,000.00
JUMLAH HARGA BAHAN 3,816,000.00
C PERALATAN
15 of 28
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
ANALISA TERAPAN
PENAWAR :
CV. ANUGRAH MULIA PRATAMA
IDRUS
DIREKTUR
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
A. BAHAN DASAR
1 Batu Utuh, Batu Kali m3 275,000.00
2 Batu Karang m3 200,000.00
3 Batu Paras m3 350,000.00
4 Kerikil Split m3 335,000.00
5 Kerikil Sungai Pilihan/Koral m3 280,000.00
6 Kerikil Sungai Tak Tersaring m3 260,000.00
7 Batu Pecah / Split 5-7 cm m3 335,000.00
3-5 cm m3 335,000.00
2-3 cm m3 335,000.00
1-2 cm m3 335,000.00
0.5-1 cm m3 335,000.00
8 Batu Gunung m3 300,000.00
9 Timbunan tanah pilihan m3 120,000.00
10 Tanah Humus (Tanah Hitam) m3 200,000.00
11 Batu Merah ukuran 5x11x22 cm bh 800.00
ukuran 5x9x22 cm bh 600.00
ukuran 5x7x22 cm bh 500.00
12 Batako ukuran 16x40x10 bh 5,000.00
13 Paving Block tebal 8 cm, mutu K-225 m2 100,000.00
tebal 8 cm, mutu K-225 bh 2,000.00
Grash Block m2 145,000.00
14 Profil Beton jadi 30 cm m' 250,000.00
15 Pasir urug m3 200,000.00
16 Pasir pasangan m3 275,000.00
17 Pasir beton m3 275,000.00
18 Sirtu m3 275,000.00
19 Kapur Pasang (Mill) kg 1,700.00
20 Kapur Bakar kg 1,350.00
21 Semen PC 50 kg zak 75,000.00
22 Semen Warna / Putih kg 3,000.00
23 Nat (Mortar Flex) kg 12,000.00
24 Perekat Bata Ringan Lemkra-116 zak 185,000.00
25 Perekat Bata Ringan MU-380 40 kg zak 185,000.00
26 Air ltr 85.00
27 Ijuk kg 42,000.00
m3 180,000.00
28 Tali Ijuk kg 42,000.00
B. BAHAN KAYU
1 Kayu klas I
- Balok m3 3,650,000.00
- Papan m3 3,650,000.00
2 Kayu klas II
- Balok m3 1,900,000.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
- Papan m3 1,900,000.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
3 Kayu klas III
- Balok m3 1,500,000.00
- Papan m3 1,500,000.00
4 Kayu bekisting klas III m3 1,500,000.00
5 Papan Palapi m3 2,500,000.00
6 Papan Lamber Seri 8 cm lbr 30,000.00
10 cm lbr 32,000.00
7 Listplank Kayu 10 cm btg 45,000.00
5 cm btg 27,000.00
3 cm btg 25,000.00
8 Listplank Ornamen jadi bh 9,000.00
9 Dolken Kayu Galam btg 10,000.00
10 Gymfloor m2 300,000.00
11 Penjaga Jarak Bekisting / Spacer bh 10,000.00
1 2 3 4 5
10 Besi Strip tebal 5 mm kg 6,000.00
Besi Strip kg 18,500.00
11 Kawat
- Licin dia. 4 mm kg 30,000.00
- Beton kg 25,000.00
- Bronjong dia. 6 mm roll 875,000.00
- Harmonika m2 31,500.00
12 Paku
- Biasa 1/2" - 1" kg 20,000.00
2" - 5" kg 20,000.00
4" - 10" kg 20,000.00
- Gypsum kg 35,000.00
- Payung dos 10,000.00
- Beton 1" - 2" bh 3,000.00
2.5" - 3.5" bh 4,000.00
4" - 6" bh 5,000.00
- Tripleks kg 27,000.00
- Paku Seng Kepala Kecil kg 35,000.00
- Paku Seng Kepala Besar kg 35,000.00
- Paku Genteng Metal kg 37,000.00
- Paku Skrup 3" - 5" dos 15,000.00
kg 19,000.00
bh 350.00
13 Skrup
- Skrup 1" bh 700.00
- Skrup 4" kg 33,500.00
- Skrup Gypsum Sunray 8x3" 300 bh / box box 105,000.00
- Skrup Gypsum Sunray 6x2" 700 bh / box box 100,000.00
- Skrup Gypsum Sunray 6x1" 2000 bh / box box 130,000.00
- Skrup Gypsum Sunray 6x1,5" 1000 bh / box box 110,000.00
- Skrup Gypsum bungkus 5 cm kg 20,000.00
- Skrup Genteng Metal kg 30,000.00
- Skrup Baja Ringan bh 300.00
- Skrup fixer bh 1,500.00
- Skrup fixer kg 37,000.00
14 Truss Canal / TS C75.75 Taso / 6 m btg 87,500.00
15 Truss Canal / TS C75.100 Taso / 6 m btg 120,000.00
16 Cord - Kanal C tebal 1 mm, panjang 6 m btg 100,000.00
17 Reng Canal U tebal 0.6 mm btg 115,000.00
18 Reng R32. 0.45 Taso / 6 m btg 55,000.00
19 Reng R40. 0.45 Taso / 6 m btg 70,000.00
20 Screw 10-16 x 16 bh 700.00
21 Screw 12-14 x 20 bh 900.00
22 Dyna Bolt bh 700.00
23 Braket L bh 2,000.00
24 Baut Mur bh 3,000.00
25 Besi Beugel/Baut, Kawat Jepit bh 60,000.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
D BAHAN LANTAI
1 Tegel Keramik
10 x 20 cm dos 60,500.00
10 x 30 cm dos 60,500.00
10 x 40 cm dos 60,500.00
20 x 20 cm dos 65,000.00
20 x 20 cm, Wafel dos 70,000.00
20 x 25 cm dos 65,000.00
25 x 40 cm dos 65,000.00
20 x 40 cm dos 65,000.00
30 x 30 cm dos 65,000.00
40 x 40 cm dos 70,000.00
40 x 40 cm, kasar dos 95,000.00
60 x 60 cm dos 120,000.00
2 Keramik Granit Tile
60 x 60 cm, Colosseum dos 225,000.00
60 x 60 cm, China dos 175,000.00
80 x 80 cm dos 245,000.00
3 Plint Keramik Tile
10 x 60 cm bh 27,500.00
10 x 40 cm bh 27,500.00
10 x 30 cm bh 27,500.00
10 x 20 cm bh 27,500.00
4 Plint Granit Tile
10 x 60 cm bh 35,000.00
10 x 40 cm bh 35,000.00
10 x 30 cm bh 35,000.00
5 Stop Nozing Keramik
10 x 60 cm, keramik bh 27,500.00
10 x 60 cm, granit bh 27,500.00
6 Kuku Tegel 10 cm bh 2,500.00
15 Parquet m2 265,000.00
16 Lem FOX Putih kg 15,000.00
FOX Kuning (karet) kg 45,000.00
17 Wallpaper lbr 50 cm roll 75,000.00
18 Floor Hardener kg 10,000.00
E BAHAN PIPA
1 Pipa Besi GIP
Ø1/2" - 6 m btg 78,000.00
Ø3/4" - 6 m btg 100,000.00
Ø1" - 6 m btg 135,000.00
Ø1 1/2" - 6 m btg 250,000.00
Ø2" - 6 m, Medium A btg 651,000.00
Ø2" - 6 m, Medium B btg 276,000.00
Ø2 1/2" - 6 m, Medium C btg 61,000.00
Ø3" - 6 m btg 525,000.00
Ø4" - 6 m btg 650,000.00
2 Knee GIP 1/2" bh 9,500.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
3 Double Nipple 1" bh 8,900.00
4 Clamp Saddle 1/2" - 3" bh 51,500.00
5 Tee GIP 1/2" bh 5,900.00
6 Socket Drat GIP 1/2" bh 5,000.00
F BAHAN FINISHING
1 Cat Tembok
- Dulux Pentalite (interior) kg 61,000.00
- Lankote Aquamate Exterior kg 37,000.00
- Paragon Interior kg 20,000.00
- Aries Gold kg 15,500.00
- Mowilex 2.5 kg 200,000.00
- Propan Acrylic Emulsion 5 Kg 118,000.00
- Propan Acrylic Emulsion Water based kg 68,000.00
2 Cat Kayu
- Glotex kg 55,500.00
- Avian kg 60,000.00
- Meni kayu kg 55,000.00
- Mowilex kg 85,000.00
3 Cat Besi
- Glotex kg 58,500.00
- Cat Atap Seng kg 26,000.00
- Cat Atap dan Genting kg 35,000.00
- Meni Besi / Seng kg 57,000.00
4 Vernis kg 35,000.00
5 Minyak cat kg 25,000.00
6 Politur ltr 80,000.00
7 Minyak bekisting ltr 10,000.00
8 Plamur Kayu kg 65,000.00
Tembok kg 12,000.00
9 Dempul kayu kg 36,000.00
Dempul Tembok kg 32,000.00
10 Residu kg 28,500.00
11 Afduner / Thinner ltr 25,000.00
12 Cat melamin kg 39,000.00
13 amplas / kertas gosok lbr 17,000.00
14 Pisau Dempul set 17,000.00
15 Kuas 5" bh 17,500.00
16 Kuas 4" bh 12,000.00
17 Kuas 3" bh 9,000.00
18 Kuas 2" bh 8,500.00
19 Kuas 1" bh 4,500.00
20 Kuas roll bh 25,000.00
21 Kapur ayak bks 46,000.00
22 Lem kayu kg 18,000.00
23 Lem Wallpaper kg 20,000.00
24 Waterproofing Aquaproof kg 50,000.00
SikaTop 107 Seal (A+B) zak 375,000.00
25 Polimer Mortar kg 30,000.00
26 List Profil Beton Jadi m' 40,000.00
27 HPL (High Pressure Laminated) 1.22 x 2.44 m lbr 465,000.00
28 Ventilasi Matahari Adat Banggai bh 650,000.00
29 Strorox - 100 kg 30,000.00
30 Soda Api kg 17,000.00
31 Sabun Rinso kg 18,000.00
32 Batu Apung kg 3,000.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
G. BAHAN KACA
1 Kaca Bening
tebal 3 mm m2 108,000.00
tebal 5 mm m2 185,600.00
tebal 8 mm m2 195,000.00
2 Kaca Rayben
tebal 3 mm m2 139,000.00
tebal 5 mm m2 195,000.00
tebal 8 mm m2 220,000.00
3 Kaca cermin tebal 5 mm m2 145,000.00
4 Sealent tube 25,000.00
kg 25,000.00
5 Karet Kaca kg 25,000.00
6 Sricker Kaca Sunblast m' 50,000.00
H. BAHAN LANGIT-LANGIT
1 Tripleks
122 x 244 cm x 3 mm lbr 49,500.00
122 x 244 cm x 4 mm lbr 77,500.00
90 x 210 cm x 3 mm lbr 56,000.00
2 Tripleks Kulit Jeruk lbr 115,000.00
3 Acoustic 40 x 60 cm lbr 56,000.00
4 Teakwood
90 x 210 cm x 3 mm lbr 90,000.00
122 x 244 cm x 3 mm lbr 105,000.00
5 Plywood
90 x 240 cm x 4 mm lbr 90,000.00
122 x 244 cm x 9 mm lbr 115,000.00
122 x 244 cm x 4 mm lbr 105,000.00
5 Gypsumboard
120 x 240 cm x 5 mm lbr 80,000.00
120 x 240 cm x 9 mm lbr 99,000.00
6 Papan Fiber Semen / Kalsiboard GRC
120 x 240 cm x 4 mm lbr 85,000.00
120 x 240 cm x 6 mm lbr 145,000.00
7 List Profil Kayu
10 cm btg 41,000.00
3 cm btg 25,000.00
5 cm btg 28,000.00
8 Profil Gypsum m' 35,000.00
9 List Profil Gypsum
Besar, p=2.4 m btg 26,000.00
Kecil, p=2.4 m btg 17,000.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
10 Cornice Adhesive kg 95,000.00
11 Perban Gypsum roll 50,000.00
12 Compound Cornice Adhesive A Plus zak 75,000.00
13 Profil Alumunium "T" m' 20,000.00
14 Kawat dia. 4 mm kg 22,000.00
15 Ramset bh 13,500.00
16 Canal C 45 m' 22,000.00
17 Kaki Seribu 65 m' 22,000.00
18 Profil L 45 m' 13,000.00
19 Kunci Penggantung bh 6,000.00
20 Braket
T.20 bh 2,500.00
T.45 bh 2,750.00
I. BAHAN ATAP
1 Genteng Metal 0.8x0.77, t=0.25 mm lbr 55,000.00
Sakura Roof, t=0.3 mm lbr 35,000.00
Sakura Roof, t=0.22 mm lbr 31,000.00
Multi Roof, t=0.4 mm lbr 39,000.00
2 Asbes Gelombang 5 mm 7 kaki lbr 74,000.00
3 Seng Gelombang
- BWG 34" BJLS 0.2 mm lbr 48,500.00
- BWG 33" BJLS 0.18 mm lbr 40,600.00
4 Seng Plat
lebar 90 cm m' 30,000.00
lebar 45 cm m' 19,500.00
lebar 30 cm m' 15,000.00
5 Seng alumunium gelombang
Atap Galvalum Spandeck 0.22 mm lbr 55,000.00
Atap Galvanis Spandeck tebal 0.3 mm m2 75,000.00
Metal Zincalume (Soka Jempol) 0.22 m 74x160 cm lbr 70,000.00
6 Nok / Bubungan
- Genteng metal Multi Roof, t=0.3 mm m' 35,000.00
- Genteng metal Sakura Roof, t=0.22 mm m' 25,000.00
- Genteng metal Spandeck, t=0.3 mm m' 25,000.00
7 Nok stell gelombang
- Super 180 cm bh 50,000.00
- Mini 105 cm bh 40,000.00
- Ekonomi 95 cm bh 20,000.00
8 Nok stell rata
- Super 180 cm lbr 45,000.00
- Mini 105 cm lbr 25,000.00
- Ekonomi 95 cm lbr 20,000.00
9 Nok 1/2 lengkungan lbr 37,000.00
10 Nok spandeck
40 cm x 0.40 cm lbr 57,000.00
30 cm x 0.25 cm lbr 38,000.00
11 Karet pelapis genteng
- lebar 55 cm m' 10,000.00
- lebar 90 cm m' 18,500.00
- lebar 120 cm m' 25,000.00
12 Alumunium foil 1.2 x 50 m roll 500,000.00
13 Talang jurai Alunzinc (baja ringan)
- Jurai alunzinc m' 53,000.00
- Setengah lingkaran btg 45,000.00
- Segi empat btg 35,000.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
14 Corong talang
- Setengah lingkaran bh 81,000.00
- Segi empat bh 38,000.00
15 Sambungan talang bh 8,500.00
16 Ornamen Lisplank bh 2,500.00
J. BAHAN PENGGANTUNG
1 Kunci Tanam
- Antik set 235,000.00
- Stainless set 435,000.00
- Royal 2x slaag set 55,000.00
- Royal 1x slaag set 50,000.00
- Kuda Terbang set 99,000.00
- Yale set 90,000.00
- Putar KM/WC set 50,000.00
2 Kunci Pintu
- Gagang SES set 250,000.00
- Tanam Kualitas Baik set 180,000.00
- Bulat Mueller set 105,000.00
3 Handle
- Stainless Steel 80 cm ex. Dekkson set 785,000.00
- Stainless Steel 30 cm ex. Dekkson set 260,000.00
- Jendela Alumunium bh 35,000.00
4 Door Closer ex. Dekkson set 390,000.00
5 Door Holder bh 85,000.00
6 Kait Angin
- Jendela psg 20,000.00
- Jendela Biasa psg 10,000.00
- Jendela bh 8,000.00
- Friction Stay (hak angin alumunium) bh 27,000.00
7 Tarikan Pintu Lemari bh 8,000.00
8 Pegangan Pintu dan Jendela bh 7,000.00
9 Grendel
- Pintu bh 10,500.00
- Jendela bh 8,000.00
- Spring Knip (grendel alumunium) bh 27,000.00
10 Engsel
- Kupu-Kupu psg 26,000.00
- Ring Pintu psg 112,750.00
- Per Pintu Koboy bh 65,000.00
- Pintu Nilon bh 17,500.00
- Pintu Kualitas Baik bh 31,000.00
- Pintu Kaca SES, Dekkson bh 190,000.00
- Jendela Kuaitas Baik bh 25,000.00
- Jendela Nilon bh 12,000.00
11 Floor Hinges Kaca Frameless set 1,627,500.00
K. BAHAN SANITAIR
1 Kloset Duduk
- Monoblok TOTO, type One Piece bh 7,400,000.00
TOTO, type Close Couple bh 3,600,000.00
- Standard INA bh 550,000.00
- Lengkap bh 1,650,000.00
2 Kloset Jongkok
- Standard INA bh 175,000.00
- Lengkap INA bh 160,000.00
CV. ANUGRAH MULIA PRATAMA
General Contractor And Supplier
Jl. Merpati Lrg. 2A Palu – Sulawesi Tengah
1 2 3 4 5
3 Urinoir
- Dinding Standart bh 367,500.00
- Keramik bh 275,000.00
4 Tangki Air 1000 L bh 1,270,500.00
5 Wastafel Keramik TOTO, type Under Counter set 2,100,000.00
TOTO, type Wall Hung set 2,000,000.00
KIA set 1,900,000.00
Wastafel biasa KIA set 385,000.00
6 Hand Shower Spray TOTO bh 350,000.00
7 Kran air
- Biasa 1/2" bh 17,000.00
- Biasa TOTO bh 75,000.00
- Angsa Biasa bh 145,000.00
TOTO bh 525,000.00
- Stainless bh 35,000.00
P. UPAH KERJA
1 Mandor Lapangan org/hari 90,000.00
2 Kepala Tukang org/hari 125,000.00
3 Tukang org/hari 115,000.00
4 Pekerja org/hari 75,000.00
PENAWAR :
CV. ANUGRAH MULIA PRATAMA
IDRUS
DIREKTUR
Nomor : 19/CV. AMP/SP/VI/2017 Luwuk 02 Juni 2017
Lampiran : 1 (satu) berkas
Kepada Yth,
Pokja Konstruksi BPBJ Kabupaten Banggai
di- Tempat
PerihaPenawaran Pekerjaan Rehabilitasi / Pemeliharaan Kantor BPKAD
Sehubungan dengan pengumuman Pemilihan Langsung Dengan Pascakualifikasi dan Dokumen Pengadaan Nomor :
BPBJ-BGI/K.2/1.03.01-10504020.3/2017 Tanggal 31 Mei 2017 dan setelah kami pelajari dengan seksama Dokumen
Pengadaan dan Berita Acara Pemberian Penjelesan [serta adendum Dokumen Pengadaan jika ada] , dengan ini kami
mengajukan penawaran untuk pekerjaan Rehabilitasi / Pemeliharaan Kantor BPKAD sebesar = 562,500,000.00
( LIMA RATUS ENAM PULUH DUA JUTA LIMA RATUS RIBU RUPIAH)
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untuk
melaksanakan pekerjaan tersebut.
Penawaran ini berlaku sejak batas akhir pemasukan Dokumen Penawaran sampai dengan tanggal 09 Mei 2017
Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan :
1. [Daftar Kuantitas dan Harga, dilampiri dengan analisa beserta urainnya, daftar upah bahan dan peralatan
1. [Daftar Kuantitas dan Harga, dilampiri dengan analisa beserta urainnya, daftar upah bahan dan peralatan
2. [Surat Perjanjian kemitraan/Kerja Sama Operasi, apabila ada];
3. Dokumen Penawaran teknis, terdiri dari :
a. Metode Pelaksanaan
b. Jadwal Waktu Pelaksanaan ;
c. Dartar Personil Inti
d. Jenis, kapasitas, komposisi, dan peralatan utama minimal yang dibutuhkan
e. Spesifikasi teknis,
f. [bagian Pekerjaan yang akan disubkontrakan, apabila ada]
4. [Formulir rekapitulasi perhitungan Tingkat Komponen Dalam Negeri (TKDN), apabila memenuhi syarat
untuk diberikanpreferensi harga; dan
5. Dokumen Kualifikasi
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada
semua ketentuan yang tercamtum dalam Dokumen Pengadaan .