REKAPITULASI BIAYA

PEKERJAAN : REHABILITASI LAPANGAN SEPAKBOLA TENJOLAUT


DESA : SUKAMAJU
KECAMATAN : CIKAKAK
KABUPATEN : SUKABUMI
PROVINSI : JAWA BARAT
DIMENSI/UNIT : 85 m x 65 m (1 Unit )

JUMLAH HARGA
No. URAIAN PEKERJAAN ( Rp )
SELURUH PEKERJAAN
1 2 3 4

I REHABILITASI LAPANGAN SEPAKBOLA TENJOLAUT


A. PEKERJAAN PENDAHULUAN
1. PEKERJAAN PERSIAPAN Rp. 3,739,830.00
B. PEKERJAAN STRUKTUR
1. PEKERJAAN SALURAN DRAINASE Rp. 64,334,572.50
2. PEKERJAAN TEMBOK PENAHAN TANAH Rp. 16,947,628.50
3. PEKERJAAN PEMBERSIHAN TANAH, RUMPUT DAN BATUAN DARI LAPANGA Rp. 85,958,400.00
4. PEKERJAAN PASANGAN RUMPUT GAJAH MINI Rp. 165,000,000.00

JUMLAH Rp. 335,980,431.00


JUMLAH TOTAL Rp. 335,980,431.00

Tiga Ratus Tiga Puluh Lima Juta Sembilan Ratus Delapan Puluh Ribu Empat Ratus Tiga Puluh Satu Rupiah

Cikakak, 31 Januari 2022


Dibuat Oleh :

Andi Aris pranoto


RENCANA ANGGARAN BIAYA ( RAB )

PEKERJAAN : REHABILITASI LAPANGAN SEPAKBOLA TENJOLAUT


DESA : SUKAMAJU
KECAMATAN : CIKAKAK
KABUPATEN : SUKABUMI
PROVINSI : JAWA BARAT
DIMENSI/UNIT : 85 m x 65 m (1 Unit )

Volume Harga Jumlah Harga


No. Uraian Pekerjaan Sat Seluruh Satuan ( Rp )
Pek
1 2 3 4 5 6=(4X5)
I REHABILITASI LAPANGAN SEPAKBOLA TENJOLAUT
A PEKERJAAN PENDAHULUAN
1. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m² 143.00 17,600.00 2,516,800.00
2 Pengukuran ls 1.00 500,000.00 500,000.00
3 Pemasangan Bowplank m' 14.00 51,645.00 723,030.00

Jumlah 3,739,830.00
B PEKERJAAN STRUKTUR
1. PEKERJAAN SALURAN DRAINASE
1 Galian Tanah Pondasi Batu Kali m³ 22.60 85,800.00 1,939,080.00
2 Urugan Pasir urug 5 cm Bawah Pondasi m³ 4.24 219,120.00 928,521.00
3 Pek. Pondasi Batu Kali m³ 62.15 962,410.00 59,813,781.50
4 Urugan Tanah Kembali m³ 26.84 61,600.00 1,653,190.00

Jumlah 64,334,572.50
2. PEKERJAAN TEMBOK PENAHAN TANAH
1 Galian Tanah Pondasi Batu Kali m³ 7.50 85,800.00 643,500.00
2 Urugan Pasir urug 5 cm Bawah Pondasi m³ 0.75 219,120.00 164,340.00
3 Pek. Pondasi Batu Kali m³ 14.85 962,410.00 14,291,788.50
4 Urugan Tanah Kembali m³ 30.00 61,600.00 1,848,000.00

Jumlah 16,947,628.50
3. PEKERJAAN PEMBERSIHAN TANAH, RUMPUT DAN BATUAN DARI LAPANGAN
1 Galian Tanah, batu dan rumput yang terhampar di lapangan m³ 440.00 85,800.00 37,752,000.00
2 Urugan Pasir urug 5 cm Bawah Pondasi m³ 220.00 219,120.00 48,206,400.00

Jumlah 85,958,400.00
4. PEKERJAAN PASANGAN RUMPUT GAJAH MINI
1 Pasangan Rumput Gajah mini + Pemeliharaan m² 4,400.00 37,500.00 165,000,000.00

Jumlah 165,000,000.00
HARGA SATUAN PEKERJAAN
PEKERJAAN PEMBANGUNAN GUNUNG CABE ECOTOURISM & ADVENTURE SPORT
PROVINSI : JAWA BARAT

HARGA SATUAN
NO. KODE URAIAN PEKERJAAN (Rp.)
1 2 3 4

ANALISA DASAR PERSIAPAN


1 1 LS MOBILISASI DAN DEMOBILISASI 2,500,000.00
2 1 LS PEKERJAAN PENGUKURAN KEMBALI 500,000.00
3 1 LS PEKERJAAN PAPAN NAMA PROYEK 400,000.00

ANALISA DASAR
1 A.2.2.1.9 1 M2 PEKERJAAN PEMBERSIHAN DAN PERATAAN SITE 17,600.00
2 A..2.2.1.4 1 M1 PASANGAN BOUWPLANK 51,645.00
3 A.2.3.1.1 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M 85,800.00
4 A.2.3.1.9 1 M3 PEK. URUGAN TANAH KEMBALI 61,600.00
5 A.2.3.1.11 1 M3 PEK. URUGAN PASIR URUG 219,120.00
6 3.2.1.9 1 M3 PASANGAN BATU KOSONG /AANSTAMPING 519,486.00
7 A.3.2.1.2 1 M3 PEK. PASANGAN PONDASI BATU KALI Ad. 1SP : 4PP 962,410.00
8 A.4.1.1.1 1 M3 PEK. LANTAI KERJA BETON MUTU f'c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 1,070,352.00
9 A.4.1.1.5 1 M3 PEK. BETON MUTU f'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 1,216,892.00
10 A.4.1.1.7 1 M3 PEK. BETON MUTU f'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 1,258,870.00
11 A.4.1.1.8 1 M3 PEK. BETON MUTU f'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 1,478,831.00
12 A.4.1.1.20 1 M2 PEK. PASANG BEKISTING UNTUK PONDASI 159,320.00
13 A.4.1.1.21 1 M2 PEK. PASANG BEKISTING UNTUK SLOOF 166,199.00
14 A.4.1.1.22 1 M2 PEK. PASANG BEKISTING UNTUK KOLOM 400,917.00
15 A.4.1.1.23 1 M2 PEK. PASANG BEKISTING UNTUK BALOK 417,417.00
16 A.4.4.1.22 1 M2 PEK. PEMASANGAN ROSTER CAMPURAN ad. 1SP : 3PP 759,954.00
17 A.4.4.1.7 1 M2 PEK. PEMASANGAN DINDING BATA MERAH TEBAL ½ BATU CAMPURAN ad. 1SP : 2PP 198,595.00
18 A.4.4.1.9 1 M2 PEK. PEMASANGAN DINDING BATA MERAH TEBAL ½ BATU CAMPURAN ad. 1SP : 4PP 190,374.00
19 A.4.4.2.2 1 M2 PEK. PEMASANGAN PLESTERAN ad. 1SP : 2PP TEBAL 15 MM 73,678.00
20 A.4.4.2.4 1 M2 PEK. PEMASANGAN PLESTERAN ad. 1SP : 4PP TEBAL 15 MM 70,009.00
21 A.4.4.2.27 1 M2 PEK. ACIAN 40,718.00
22 1 M3 ADUKAN CAMP. 1 PC : 4 PS 632,870.00
23 1 M2 PEK. PASANG LANTAI KERAMIK UK. 40 X 40 CM WARNA/ CORAK PLATINUM 302,538.00
24 A.4.4.3.35 1 M2 PEK. PASANG LANTAI KERAMIK UK. 30 X 30 CM WARNA/ CORAK SET. PLATINUM 365,788.00
25 1 M2 PEK. PASANG DINDING KERAMIK UK. 20 X 25 CM WARNA/ CORAK SET. PLATINUM 387,788.00
26 A.4.4.3.36 1 M2 PEK. PASANG LANTAI KERAMIK UK. 20 X 20 CM WARNA/ CORAK ANTI SLIP SET. PLATINUM 340,048.00
27 1 KG PEK. TULANGAN BETON DENGAN BESI POLOS U-24 19,532.00
28 1 M2 PASANG RANGKA ATAP BAJA RINGAN 189,354.00
29 A.4.5.2.32 1 M2 PASANG PENUTUP ATAP GENTENG METAL BERPASIR 106,282.00
30 1 M1 PASANG BUBUNGAN GENTENG METAL BERPASIR 116,446.00
31 1 M1 PASANG TALANG SENG GALVALUM BJLS 126,742.00
32 1 M1 PEK. PASANG LISTPLANK GRC 86,790.00
33 A.4.2.1.11 1 M1 PEK. PASANGAN KUSEN PINTU/ JENDELA ALUMUNIUM PROFIL NATURAL 3" 129,137.00
34 1 BH PEK. MEMASANG KUNCI PINTU 2 SLAAG 274,510.00
35 A.4.6.2.5 1 BH PEK. MEMASANG ENGSEL PINTU 60,385.00
36 A.4.6.2.8 1 BH PEK. MEMASANG ENGSEL JENDELA 60,385.00
37 1 BH PEK. MEMASANG DOOR CLOSER 171,996.00
38 1 BH PEK. MEMASANG SLOOT PINTU 56,672.00
39 1 BH PEK. MEMASANG SLOOT JENDELA 56,672.00
40 A.4.6.2.17 1 M2 PEK. MEMASANG KACA POLOS T = 5MM 181,385.00
41 1 BH PEK. MEMASANG TARIKAN PINTU 115,385.00
42 1 CM PEMASANGAN PAPANNAMA T=9CM (STAINLESS) 32,450.00
45 1 UNIT PEK. PASANG PINTU KAMAR MANDI PVC KUALITAS BAIK (P.3) 771,650.00
46 1 M2 PEK. PARTISI RANGKA KAYU BORNEO UK. 5/7 + PENUTUP GRC T = 5 MM 234,487.00
47 1 M2 PEK. PASANG RANGKA PLAFOND BESI HOLLOW 118,712.00
48 1 M2 PEK. PASANG PLAFOND GYPSUM T = 9 MM 65,500.00
49 1 M2 PEK. PASANG PLAFOND GRC BOARD T = 5 mm 43,660.00
50 1 M1 PEK. PASANG LIST PLAFOND LIST PROFIL GYPSUM T = 10 CM 35,627.00
51 1 M2 PEK. PENGECATAN PLAFOND BARU (3X) VINILEX 47,146.00
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN (Rp.)
52 A.4.7.1.10 1 M2 PEK. PENGECATAN TEMBOK BARU (3X) VINILEX 43,445.00
54 1 SET. PEK. PASANG BOX MCB 608,080.00
55 1 TITIK PEK. PASANG INSTALASI TITIK LAMPU 198,385.00
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN (Rp.)
56 1 TITIK PEK. PASANG INSTALASI TITIK STOP KONTAK/ DAYA 187,385.00
57 1 BH PEK. PASANG STOP KONTAK 46,345.00
58 1 BH PEK. PASANG SAKLAR TUNGGAL 40,845.00
59 1 BH PEK. PASANG SAKLAR GANDA 46,345.00
60 1 BH PEK. PASANG SAKLAR TRIPLE 51,845.00
61 1 TITIK PEK. PASANG LAMPU TL 2X18 RM300 ACRYLIC 324,095.00
62 1 TITIK PEK. PASANG LAMPU TL 2X18 RM300 MIRROR 296,595.00
63 1 TITIK PEK. PASANG LAMPU TL 2X36 W V-SHAPE 406,595.00
64 1 TITIK PEK. PASANG LAMPU DOWNLIGHT PLE 20 W 159,095.00
65 1 TITIK PEK. PASANG LAMPU SL 18 WATT 71,095.00
66 1 UNIT. PASANG LAMPU SOROT 30 W PHILIPS BVP 150 LED25 410,885.00
67 1 UNIT LAMPU TL 1 x 36 WATT SETARA PHILIP + ARMATUR TKO 291,095.00
73 1 UNIT. PASANG LAMPU SOLAR CELL 90 W ALL IN ONE 571,045.00
74 A.5.1.1.25 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 1/2" SET. MASPION 27,842.00
75 A.5.1.1.26 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 3/4" SET. MASPION 30,069.00
76 A.5.1.1.27 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 1" SET. MASPION 34,029.00
77 A.5.1.1.29 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 2" SET. MASPION 37,989.00
78 A.5.1.1.31 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 3" SET. MASPION 59,027.00
79 A.5.1.1.31 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 4" SET. MASPION 102,339.00
83 0 1 M1 PEK. PASANG PIPA GALVANIS 3" 445,539.00
73 1 BH PEK. PASANG KRAN AIR DIA. 1/2" ATAU 3/4" 81,317.00
74 A.5.1.1.14 1 BH PEK. PASANG FLOOR DRAIN 163,680.00
75 A.5.1.1.2 1 BH PEK. PASANG CLOSET JONGKOK 727,790.00
76 1 M1 PEK. PASANG GRAVEL U. 1/2 DIA. 30 CM 74,578.00
77 1 M2 PEK. PASANG PAVING BLOCK NATURAL T = 8 CM 246,631.00
78 1 M1 PEKERJAAN PASANG KASTEEN PAVING BLOCK UK. 10 X 20 X 35 CM 238,188.00
79 1 LS MOBILISASI DAN DEMOBILISASI ALAT DAN PERALATAN 2,086,560.00
ANALISA ITEM PEKERJAAN
1 1 M3 PEK. PONDASI TELAPAK (PS.1) UK. 80 X 80 X 25 CM BETON BERTULANG K. 225 (Site Mix) 4,169,500.00
2 1 M3 PEK. PONDASI TELAPAK (PS.2) UK. 60 X 60 X 20 CM BETON BERTULANG K. 175 (Site Mix) 4,506,918.00
3 1 M3 PEK. PONDASI TELAPAK (PS.3) UK. 40 X 40 X 20 CM BETON BERTULANG K. 175 (Site Mix) 5,539,814.00
4 1 M3 PEK. SLOOF (S.1) UK. 20 X 30 CM BETON BERTULANG K.225 (Site Mix) 4,392,882.00
5 1 M3 PEK. SLOOF (S.2) UK. 15 X 20 CM BETON BERTULANG K.175 (Site Mix) 5,852,639.00
6 1 M3 PEK. KOLOM PEDESTAL (KPDL.1) UK. 25 x 25 CM BETON BERTULANG K. 225 (Site Mix) 3,204,200.00
7 1 M3 PEK. KOLOM PEDESTAL (KPDL.2) UK. 30 x 30 CM BETON BERTULANG K. 175 (Site Mix) 2,686,014.00
8 1 M3 PEK. KOLOM PEDESTAL (KPDL.3) UK. 20 x 25 CM BETON BERTULANG K. 175 (Site Mix) 3,542,987.00
9 1 M3 PEK. KOLOM PEDESTAL (KPDL.4) UK. 20 x 20 CM BETON BERTULANG K. 175 (Site Mix) 3,993,418.00
10 1 M3 PEK. KOLOM PEDESTAL UK. 15 x 25 CM BETON BERTULANG K. 225 (Site Mix) 4,220,016.00
11 1 M3 PEK. KOLOM (K.1) UK. 30 x 30 CM BETON BERTULANG K. 175 (Site Mix) 2,686,274.00
12 1 M3 PEK. KOLOM (K.2) UK. 20 x 25 CM BETON BERTULANG K. 175 (Site Mix) 3,543,455.00
13 1 M3 PEK. KOLOM PRAKTIS (KP.1) UK. 15 x 15 CM BETON BERTULANG K. 225 (Site Mix) 5,731,377.00
14 1 M3 PEK. KOLOM PRAKTIS (KP.2) UK. 15 x 15 CM BETON BERTULANG K. 175 (Site Mix) 5,689,399.00
15 1 M3 PEK. BALOK (B.1) UK. 15 X 20 CM BETON BERTULANG K.225 (Site Mix) 4,786,626.00
16 1 M3 PEK. RING BALK (RB.1) UK. 15 X 15 CM BETON BERTULANG K.175 (Site Mix) 5,689,399.00
17 1 M3 PEK. RING BALK (RB.2) UK. 12 X 15 CM BETON BERTULANG K.175 (Site Mix) 6,634,461.00
18 1 M3 PEK. BALOK LINTEL (BL.1) UK. 12 X 12 CM BETON BERTULANG K.175 (Site Mix) 6,280,830.00
19 1 M3 PEK. BALOK LINTEL (BL.2) UK. 10 X 10 CM BETON BERTULANG K.175 (Site Mix) 8,095,501.00
20 1 UNIT PEK. BOUVENLIGH UK. 50 X 75 CM (BV) 301,955.00
21 1 M1 PEK. SALURAN GRAVEL 1/2 DIA. 30 CM + PAS. BATA MERAH 446,743.00
22 1 M2 PEK. KANOPI KONSOL RANGKA HOLLOW + ATAP PENUTUP SENG GALVALUM T = 0,5 mm 560,282.00
23 1 UNIT PEK. PEMBUATAN SUMUR DALAM SUMERSIBLE KEDALAMAN 40 M + KELENGKAPANNYA 34,623,200.00
24 1 UNIT PEKERJAAN SEPTICTANK UK 2,5 X 1,5 X 2 M 12,108,400.00
25 1 UNIT PEKERJAAN TOWER + TORN KAPASITAS 1M3 10,668,300.00
26 1 UNIT PEK. PINTU ALUMUNIUM 3' ( P2 ) Uk 100x270 Cm 2,894,600.00
27 1 UNIT PEK. PINTU ALUMUNIUM 3' ( P1 ) Uk. 170x270 Cm 4,162,400.00
28 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J1 ) Uk.255x270 Cm 4,600,100.00
29 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J2 ) Uk.190x225Cm 3,682,300.00
30 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J3 ) Uk 115x255 Cm 2,931,800.00
31 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J4 ) Uk 115x255 Cm 2,290,200.00
32 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( V1) Uk 50x255 Cm 1,307,400.00
33 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( V2) Uk 50x190Cm 996,400.00
34 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( V3) Uk 55x60Cm 374,400.00
HARGA SATUAN
NO. KODE URAIAN PEKERJAAN (Rp.)
35 1 M2 PAGAR RANGKA HOLLOW T = 1,2 mm 962,600.00
36 1 UNIT PEK. PEMBUATAN SUMUR DALAM SUMERSIBLE KEDALAMAN 60 M + KELENGKAPANNYA 39,626,200.00
37 1 M2 PARTISI RANGKA HOLLOW 746,800.00
38 1 UNIT PEKERJAAN MEJA PORTABLE RANGKA HOLLOW+ MULTIFLEK LAPIS HPL UK,100X200 CM 3,401,700.00
ANALISA HARGA SATUAN PEKERJAAN

NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

ANALISA DASAR
A.2.2.1.9
1 M2 PEKERJAAN PEMBERSIHAN DAN PERATAAN SITE
A. TENAGA KERJA
Pekerja OH 0.1000 100,000.00 10,000.00
Mandor OH 0.0500 120,000.00 6,000.00
Jumlah Harga Tenaga Kerja 16,000.00

B. BAHAN
-
-
Jumlah Harga Bahan -

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 16,000.00
E. Keuntungan Maksimal 10% 10% 1,600.00
F. Jumlah (D + E) 17,600.00
G. Dibulatkan 17,600.00

A..2.2.1.4
1 M1 PASANGAN BOUWPLANK
A. TENAGA KERJA
Pekerja OH 0.1000 100,000.00 10,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 22,800.00

B. BAHAN
Kayu 5/7 cm Albasiah M3 0.0120 1,250,000.00 15,000.00
Paku Biasa 2" - 5" cm Kg 0.0200 20,000.00 400.00
Kayu Papan 3/20 cm Albasiah M3 0.0070 1,250,000.00 8,750.00
Jumlah Harga Bahan 24,150.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 46,950.00
E. Keuntungan Maksimal 10% 10% 4,695.00
F. Jumlah (D + E) 51,645.00
G. Dibulatkan 51,645.00
A.2.3.1.1
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M
A. TENAGA KERJA
Pekerja OH 0.7500 100,000.00 75,000.00
Mandor OH 0.0250 120,000.00 3,000.00
Jumlah Harga Tenaga Kerja 78,000.00

B. BAHAN
-
-
Jumlah Harga Bahan -

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 78,000.00
E. Keuntungan Maksimal 10% 10% 7,800.00
F. Jumlah (D + E) 85,800.00
G. Dibulatkan 85,800.00
3.2.1.9
1 M3 PASANGAN BATU KOSONG /AANSTAMPING
A. TENAGA KERJA
Pekerja OH 0.7800 100,000.00 78,000.00
Tukang Batu OH 0.3900 110,000.00 42,900.00
Kepala Tukang Batu OH 0.0390 120,000.00 4,680.00
Mandor OH 0.0390 120,000.00 4,680.00
Jumlah Harga Tenaga Kerja 130,260.00

B. BAHAN
Batu Belah M3 1.2000 250,000.00 300,000.00
Pasir Urug M3 0.3000 140,000.00 42,000.00
Jumlah Harga Bahan 342,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 472,260.00
E. Keuntungan Maksimal 10% 10% 47,226.00
F. Jumlah (D + E) 519,486.00
G. Dibulatkan 519,486.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
A.3.2.1.2
1 M3 PEK. PASANGAN PONDASI BATU KALI Ad. 1SP : 4PP
A. TENAGA KERJA
Pekerja OH 1.5000 100,000.00 150,000.00
Tukang OH 0.7500 110,000.00 82,500.00
Kepala Tukang OH 0.0750 120,000.00 9,000.00
Mandor OH 0.0750 120,000.00 9,000.00
Jumlah Harga Tenaga Kerja 250,500.00

B. BAHAN
Batu Belah Pondasi M3 1.2000 250,000.00 300,000.00
Portlan Semen 50 Kg Zak 3.2600 55,650.00 181,419.00
Pasir Pasang M3 0.5200 275,000.00 143,000.00
Jumlah Harga Bahan 624,419.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 874,919.00
E. Keuntungan Maksimal 10% 10% 87,491.90
F. Jumlah (D + E) 962,410.90
G. Dibulatkan 962,410.00
A.4.1.1.5
1 M3 PEK. BETON MUTU f'c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
A. TENAGA KERJA
Pekerja OH 1.6500 100,000.00 165,000.00
Tukang OH 0.2750 110,000.00 30,250.00
Kepala Tukang OH 0.0280 120,000.00 3,360.00
Mandor OH 0.0830 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 208,570.00

B. BAHAN
Portlan Semen 50 Kg Zak 6.5200 55,650.00 362,838.00
Pasir Beton M3 0.5429 375,000.00 203,587.50
Batu Pecah Mesin (maksimum 30mm) M3 0.7622 350,000.00 266,770.00
Air Ltr 215.0000 300.00 64,500.00
Jumlah Harga Bahan 897,695.50

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 1,106,265.50
E. Keuntungan Maksimal 10% 10% 110,626.55
F. Jumlah (D + E) 1,216,892.05
G. Dibulatkan 1,216,892.00
A.4.1.1.7
1 M3 PEK. BETON MUTU f'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
A. TENAGA KERJA
Pekerja OH 1.6500 100,000.00 165,000.00
Tukang OH 0.2750 110,000.00 30,250.00
Kepala Tukang OH 0.0280 120,000.00 3,360.00
Mandor OH 0.0830 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 208,570.00

B. BAHAN
Portlan Semen 50 Kg Zak 7.4200 55,650.00 412,923.00
Pasir Beton M3 0.4986 375,000.00 186,975.00
Batu Pecah Mesin (maksimum 30mm) M3 0.7756 350,000.00 271,460.00
Air Ltr 215.0000 300.00 64,500.00
Jumlah Harga Bahan 935,858.00

C. PERALATAN
-
-
120000 -
D. Jumlah (A + B + C) 1,144,428.00
E. Keuntungan Maksimal 10% 10% 114,442.80
F. Jumlah (D + E) 1,258,870.80
G. Dibulatkan 1,258,870.00
A.4.1.1.8
1 M3 PEK. BETON MUTU f'c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
A. TENAGA KERJA
Pekerja OH 1.6500 100,000.00 165,000.00
Tukang OH 0.2750 110,000.00 30,250.00
Kepala Tukang OH 0.0280 120,000.00 3,360.00
Mandor OH 0.0830 120,000.00 9,960.00
Jumlah Harga Tenaga Kerja 208,570.00

B. BAHAN
Portlan Semen 50 Kg Zak 7.6800 55,650.00 427,392.00
Pasir Beton M3 0.6920 375,000.00 259,500.00
Batu Pecah Mesin (maksimum 30mm) M3 1.0390 370,000.00 384,430.00
Air Ltr 215.0000 300.00 64,500.00
Jumlah Harga Bahan 1,135,822.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 1,344,392.00
E. Keuntungan Maksimal 10% 10% 134,439.20
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
F. Jumlah (D + E) 1,478,831.20
G. Dibulatkan 1,478,831.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
A.4.1.1.20
19 1 M2 PEK. PASANG BEKISTING UNTUK PONDASI
A. TENAGA KERJA
Pekerja OH 0.5200 100,000.00 52,000.00
Tukang OH 0.2600 110,000.00 28,600.00
Kepala Tukang OH 0.0260 120,000.00 3,120.00
Mandor OH 0.0260 120,000.00 3,120.00
Jumlah Harga Tenaga Kerja 86,840.00

B. BAHAN
Kayu Kls III/ Papan/ Balok Albasia M3 0.0400 1,250,000.00 50,000.00
Paku Biasa 2" - 5" Kg 0.3000 20,000.00 6,000.00
Minyak Bekisting Ltr 0.1000 20,000.00 2,000.00
Jumlah Harga Bahan 58,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 144,840.00
E. Keuntungan Maksimal 10% 10% 14,484.00
F. Jumlah (D + E) 159,324.00
G. Dibulatkan 159,320.00
A.4.1.1.21
20 1 M2 PEK. PASANG BEKISTING UNTUK SLOOF
A. TENAGA KERJA
Pekerja OH 0.5200 100,000.00 52,000.00
Tukang OH 0.2600 110,000.00 28,600.00
Kepala Tukang OH 0.0260 120,000.00 3,120.00
Mandor OH 0.0260 120,000.00 3,120.00
Jumlah Harga Tenaga Kerja 86,840.00

B. BAHAN
Kayu Kls III/ Papan/ Balok Albasia M3 0.0450 1,250,000.00 56,250.00
Paku Biasa 2" - 5" Kg 0.3000 20,000.00 6,000.00
Minyak Bekisting Ltr 0.1000 20,000.00 2,000.00
Jumlah Harga Bahan 64,250.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 151,090.00
E. Keuntungan Maksimal 10% 10% 15,109.00
F. Jumlah (D + E) 166,199.00
G. Dibulatkan 166,199.00
A.4.1.1.22
21 1 M2 PEK. PASANG BEKISTING UNTUK KOLOM
A. TENAGA KERJA
Pekerja OH 0.6600 100,000.00 66,000.00
Tukang OH 0.3300 110,000.00 36,300.00
Kepala Tukang OH 0.0330 120,000.00 3,960.00
Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 110,220.00

B. BAHAN
Kayu Kls III/ Papan/ Balok Albasia M3 0.0400 1,250,000.00 50,000.00
Paku Biasa 2" - 5" Kg 0.4000 20,000.00 8,000.00
Minyak Bekisting Ltr 0.2000 20,000.00 4,000.00
Balok Kayu Kls II / Borneo 5/7 M3 0.0150 5,000,000.00 75,000.00
Multiplek Tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken dia 8 - 10/400 cm Btg 2.0000 35,000.00 70,000.00
Jumlah Harga Bahan 254,250.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 364,470.00
E. Keuntungan Maksimal 10% 10% 36,447.00
F. Jumlah (D + E) 400,917.00
G. Dibulatkan 400,917.00
A.4.1.1.23
22 1 M2 PEK. PASANG BEKISTING UNTUK BALOK
A. TENAGA KERJA
Pekerja OH 0.6600 100,000.00 66,000.00
Tukang OH 0.3300 110,000.00 36,300.00
Kepala Tukang OH 0.0330 120,000.00 3,960.00
Mandor OH 0.0330 120,000.00 3,960.00
Jumlah Harga Tenaga Kerja 110,220.00

B. BAHAN
Kayu Kls III/ Papan/ Balok Albasia M3 0.0400 1,250,000.00 50,000.00
Paku Biasa 2" - 5" Kg 0.4000 20,000.00 8,000.00
Minyak Bekisting Ltr 0.2000 20,000.00 4,000.00
Balok Kayu Kls II / Borneo 5/7 M3 0.0180 5,000,000.00 90,000.00
Multiplek Tebal 9 mm Lbr 0.3500 135,000.00 47,250.00
Dolken dia 8 - 10/400 cm Btg 2.0000 35,000.00 70,000.00
Jumlah Harga Bahan 269,250.00

C. PERALATAN
-
-
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 379,470.00
E. Keuntungan Maksimal 10% 10% 37,947.00
F. Jumlah (D + E) 417,417.00
G. Dibulatkan 417,417.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
A.4.4.1.22
25 1 M2 PEK. PEMASANGAN ROSTER CAMPURAN ad. 1SP : 3PP
A. TENAGA KERJA
Pekerja OH 0.3000 100,000.00 30,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 44,000.00

B. BAHAN
Bata Roster M2 25.0000 25,000.00 625,000.00
Portlan Semen 50 Kg Kg 11.0000 1,113.00 12,243.00
Pasir Pasang M3 0.0350 275,000.00 9,625.00
Jumlah Harga Bahan 646,868.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 690,868.00
E. Keuntungan Maksimal 10% 10% 69,086.80
F. Jumlah (D + E) 759,954.80
G. Dibulatkan 759,954.00
A.4.4.1.7
26 1 M2 PEK. PEMASANGAN DINDING BATA MERAH TEBAL ½ BATU CAMPURAN ad. 1SP : 2PP
A. TENAGA KERJA
Pekerja OH 0.3000 100,000.00 30,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 44,000.00

B. BAHAN
Bata Merah Bh 70.0000 1,500.00 105,000.00
Portlan Semen 50 Kg Zak 0.3790 55,650.00 21,091.35
Pasir Pasang M3 0.0380 275,000.00 10,450.00
Jumlah Harga Bahan 136,541.35

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 180,541.35
E. Keuntungan Maksimal 10% 10% 18,054.14
F. Jumlah (D + E) 198,595.49
G. Dibulatkan 198,595.00
A.4.4.1.9
27 1 M2 PEK. PEMASANGAN DINDING BATA MERAH TEBAL ½ BATU CAMPURAN ad. 1SP : 4PP
A. TENAGA KERJA
Pekerja OH 0.3000 100,000.00 30,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 44,000.00

B. BAHAN
Bata Merah Bh 70.0000 1,500.00 105,000.00
Portlan Semen 50 Kg Zak 0.2200 55,650.00 12,243.00
Pasir Pasang M3 0.0430 275,000.00 11,825.00
Jumlah Harga Bahan 129,068.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 173,068.00
E. Keuntungan Maksimal 10% 10% 17,306.80
F. Jumlah (D + E) 190,374.80
G. Dibulatkan 190,374.00
A.4.4.2.2
28 1 M2 PEK. PEMASANGAN PLESTERAN ad. 1SP : 2PP TEBAL 15 MM
A. TENAGA KERJA
Pekerja OH 0.3000 100,000.00 30,000.00
Tukang OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 50,100.00

B. BAHAN
Pasir Pasang M3 0.0200 275,000.00 5,500.00
Portlan Semen 50 Kg Zak 0.2045 55,650.00 11,380.43
Jumlah Harga Bahan 16,880.43

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 66,980.43
E. Keuntungan Maksimal 10% 10% 6,698.04
F. Jumlah (D + E) 73,678.47
G. Dibulatkan 73,678.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
A.4.4.2.4
29 1 M2 PEK. PEMASANGAN PLESTERAN ad. 1SP : 4PP TEBAL 15 MM
A. TENAGA KERJA
Pekerja OH 0.3000 100,000.00 30,000.00
Tukang OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 50,100.00

B. BAHAN
Pasir Pasang M3 0.0240 275,000.00 6,600.00
Portlan Semen 50 Kg Zak 0.1248 55,650.00 6,945.12
Jumlah Harga Bahan 13,545.12

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 63,645.12
E. Keuntungan Maksimal 10% 10% 6,364.51
F. Jumlah (D + E) 70,009.63
G. Dibulatkan 70,009.00
A.4.4.2.27
30 1 M2 PEK. ACIAN
A. TENAGA KERJA
Pekerja OH 0.2000 100,000.00 20,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0100 120,000.00 1,200.00
Jumlah Harga Tenaga Kerja 33,400.00

B. BAHAN
Portlan Semen 50 Kg Zak 0.0650 55,650.00 3,617.25

Jumlah Harga Bahan 3,617.25

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 37,017.25
E. Keuntungan Maksimal 10% 10% 3,701.73
F. Jumlah (D + E) 40,718.98
G. Dibulatkan 40,718.00

31 1 M3 ADUKAN CAMP. 1 PC : 4 PS
A. TENAGA KERJA
Pekerja OH 0.8000 100,000.00 80,000.00
Tukang OH 0.4000 110,000.00 44,000.00
Kepala Tukang OH 0.0400 120,000.00 4,800.00
Mandor OH 0.0800 120,000.00 9,600.00
Jumlah Harga Tenaga Kerja 138,400.00

B. BAHAN
Portlan Semen 50 Kg Zak 2.8605 55,650.00 159,186.83
Pasir Pasang M3 1.0100 275,000.00 277,750.00
Jumlah Harga Bahan 436,936.83

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 575,336.83
E. Keuntungan Maksimal 10% 10% 57,533.68
F. Jumlah (D + E) 632,870.51
G. Dibulatkan 632,870.00

32 1 M2 PEK. PASANG LANTAI KERAMIK UK. 40 X 40 CM WARNA/ CORAK PLATINUM


A. TENAGA KERJA
Pekerja OH 0.9000 100,000.00 90,000.00
Tukang OH 0.4500 110,000.00 49,500.00
Kepala Tukang OH 0.0450 120,000.00 5,400.00
Mandor OH 0.0450 120,000.00 5,400.00
Jumlah Harga Tenaga Kerja 150,300.00

B. BAHAN
Keramik Uk. 40 x 40 Cm Warna/ Corak Set. Accura M2 1.0000 65,000.00 65,000.00
Portlan Semen 50 Kg Zak 0.1920 55,650.00 10,684.80
Pasir Pasang M3 0.1500 275,000.00 41,250.00
Semen Warna Kg 1.3000 6,000.00 7,800.00
Jumlah Harga Bahan 124,734.80

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 275,034.80
E. Keuntungan Maksimal 10% 10% 27,503.48
F. Jumlah (D + E) 302,538.28
G. Dibulatkan 302,538.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
A.4.4.3.35
33 1 M2 PEK. PASANG LANTAI KERAMIK UK. 30 X 30 CM WARNA/ CORAK SET. PLATINUM
A. TENAGA KERJA
Pekerja OH 0.7000 100,000.00 70,000.00
Tukang OH 0.4500 110,000.00 49,500.00
Kepala Tukang OH 0.0450 120,000.00 5,400.00
Mandor OH 0.0450 120,000.00 5,400.00
Jumlah Harga Tenaga Kerja 130,300.00

B. BAHAN
Keramik Uk. 30 x 30 Cm Warna/ Corak Set. Accura M2 1.0000 60,000.00 60,000.00
Portlan Semen 50 Kg Zak 0.1920 55,650.00 10,684.80
Pasir Pasang M3 0.4500 275,000.00 123,750.00
Semen Warna Kg 1.3000 6,000.00 7,800.00
Jumlah Harga Bahan 202,234.80

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 332,534.80
E. Keuntungan Maksimal 10% 10% 33,253.48
F. Jumlah (D + E) 365,788.28
G. Dibulatkan 365,788.00

34 1 M2 PEK. PASANG DINDING KERAMIK UK. 20 X 25 CM WARNA/ CORAK SET. PLATINUM


A. TENAGA KERJA
Pekerja OH 0.9000 100,000.00 90,000.00
Tukang OH 0.4500 110,000.00 49,500.00
Kepala Tukang OH 0.0450 120,000.00 5,400.00
Mandor OH 0.0450 120,000.00 5,400.00
Jumlah Harga Tenaga Kerja 150,300.00

B. BAHAN
Keramik Uk. 20 x 25 Cm Warna/ Corak Set. Accura M2 1.0000 60,000.00 60,000.00
Portlan Semen 50 Kg Zak 0.1920 55,650.00 10,684.80
Pasir Pasang M3 0.4500 275,000.00 123,750.00
Semen Warna Kg 1.3000 6,000.00 7,800.00
Jumlah Harga Bahan 202,234.80

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 352,534.80
E. Keuntungan Maksimal 10% 10% 35,253.48
F. Jumlah (D + E) 387,788.28
G. Dibulatkan 387,788.00
A.4.4.3.36
35 1 M2 PEK. PASANG LANTAI KERAMIK UK. 20 X 20 CM WARNA/ CORAK ANTI SLIP SET. PLATINUM
A. TENAGA KERJA
Pekerja OH 0.7000 100,000.00 70,000.00
Tukang OH 0.3500 110,000.00 38,500.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0350 120,000.00 4,200.00
Jumlah Harga Tenaga Kerja 116,900.00

B. BAHAN
Keramik Uk. 20 x 20 Cm Warna/ Corak Anti Slip Set. Accura M2 1.0000 50,000.00 50,000.00
Portlan Semen 50 Kg Zak 0.1920 55,650.00 10,684.80
Pasir Pasang M3 0.4500 275,000.00 123,750.00
Semen Warna Kg 1.3000 6,000.00 7,800.00
Jumlah Harga Bahan 192,234.80

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 309,134.80
E. Keuntungan Maksimal 10% 10% 30,913.48
F. Jumlah (D + E) 340,048.28
G. Dibulatkan 340,048.00

36 1 KG PEK. TULANGAN BETON DENGAN BESI POLOS U-24


A. TENAGA KERJA
Pekerja OH 0.0070 100,000.00 700.00
Tukang OH 0.0070 110,000.00 770.00
Kepala Tukang OH 0.0007 120,000.00 84.00
Mandor OH 0.0004 120,000.00 48.00
Jumlah Harga Tenaga Kerja 1,602.00

B. BAHAN
Besi Beton Polos U-24 Kg 1.0500 15,100.00 15,855.00
Kawat Beton Kg 0.0150 20,000.00 300.00
Jumlah Harga Bahan 16,155.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 17,757.00
E. Keuntungan Maksimal 10% 10% 1,775.70
F. Jumlah (D + E) 19,532.70
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
G. Dibulatkan 19,532.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

48 1 M2 PASANG RANGKA ATAP BAJA RINGAN


A. TENAGA KERJA
Pekerja OH 0.1000 100,000.00 10,000.00
Tukang Besi OH 0.3000 110,000.00 33,000.00
Kepala Tukang Besi OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0020 120,000.00 240.00
Jumlah Harga Tenaga Kerja 45,640.00

B. BAHAN
Kuda-Kuda Baja Ringan Zinkalum uk. 75 x 35 x 0.75 mm Reng t = 0,45 mm M2 1.1000 115,000.00 126,500.00
-
Jumlah Harga Bahan 126,500.00

C. PERALATAN
Alat Bantu Ls 1.0000 - -
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 172,140.00
E. Keuntungan Maksimal 10% 10% 17,214.00
F. Jumlah (D + E) 189,354.00
G. Dibulatkan 189,354.00
A.4.5.2.32
49 1 M2 PASANG PENUTUP ATAP GENTENG METAL BERPASIR
A. TENAGA KERJA
Pekerja OH 0.2000 100,000.00 20,000.00
Tukang Besi OH 0.1000 110,000.00 11,000.00
Kepala Tukang Besi OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0010 120,000.00 120.00
Jumlah Harga Tenaga Kerja 32,320.00

B. BAHAN
Genteng Metal Berpasir M2 1.0200 40,000.00 40,800.00
Paku Khusus Bh 6.0000 1,000.00 6,000.00
Jumlah Harga Bahan 46,800.00

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00
-
Jumlah Harga Peralatan 17,500.00
D. Jumlah (A + B + C) 96,620.00
E. Keuntungan Maksimal 10% 10% 9,662.00
F. Jumlah (D + E) 106,282.00
G. Dibulatkan 106,282.00

51 1 M1 PASANG TALANG SENG BJLS


A. TENAGA KERJA
Pekerja OH 0.1250 100,000.00 12,500.00
Tukang Besi OH 0.2500 110,000.00 27,500.00
Kepala Tukang Besi OH 0.0250 120,000.00 3,000.00
Mandor OH 0.0060 120,000.00 720.00
Jumlah Harga Tenaga Kerja 43,720.00

B. BAHAN
Seng Galvalum BJLS M1 1.2000 40,000.00 48,000.00
Paku Khusus Bh 6.0000 1,000.00 6,000.00
Jumlah Harga Bahan 54,000.00

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00
-
Jumlah Harga Peralatan 17,500.00
D. Jumlah (A + B + C) 115,220.00
E. Keuntungan Maksimal 10% 10% 11,522.00
F. Jumlah (D + E) 126,742.00
G. Dibulatkan 126,742.00

52 1 M1 PASANG BUBUNGAN GENTENG METAL BERPASIR


A. TENAGA KERJA
Pekerja OH 0.2500 100,000.00 25,000.00
Tukang Besi OH 0.1500 110,000.00 16,500.00
Kepala Tukang Besi OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0130 120,000.00 1,560.00
Jumlah Harga Tenaga Kerja 44,860.00

B. BAHAN
Bubungan Metal Berpasir M1 1.1000 50,000.00 55,000.00
Paku Khusus Bh 6.0000 1,000.00 6,000.00
Jumlah Harga Bahan 61,000.00

C. PERALATAN
Alat Bantu Ls 1.0000 - -
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 105,860.00
E. Keuntungan Maksimal 10% 10% 10,586.00
F. Jumlah (D + E) 116,446.00
G. Dibulatkan 116,446.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

53 1 M1 PEK. PASANG LISTPLANK GRC


A. TENAGA KERJA
Pekerja OH 0.1000 100,000.00 10,000.00
Tukang OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 35,000.00

B. BAHAN
Listplank GRC Warna M1 1.0000 40,000.00 40,000.00
Skrup Bh 6.0000 650.00 3,900.00
Jumlah Harga Bahan 43,900.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 78,900.00
E. Keuntungan Maksimal 10% 10% 7,890.00
F. Jumlah (D + E) 86,790.00
G. Dibulatkan 86,790.00

54 1 M2 PEKERJAAN PASANG HPL


A. TENAGA KERJA
Pekerja OH 0.7000 100,000.00 70,000.00
Tukang OH 0.3500 110,000.00 38,500.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0350 120,000.00 4,200.00
Jumlah Harga Tenaga Kerja 116,900.00

B. BAHAN
HPL M2 1.0500 72,916.67 76,562.50
Lem Fox Kg 0.6000 50,000.00 30,000.00
Jumlah Harga Bahan 106,562.50

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00

Jumlah Harga Peralatan 17,500.00


D. Jumlah (A + B + C) 240,962.50
E. Keuntungan Maksimal 10% 10% 24,096.25
F. Jumlah (D + E) 265,058.75
G. Dibulatkan 265,058.00

55 1 M2 PEKERJAAN MULTIFLEK T = 9MM


A. TENAGA KERJA
Pekerja OH 0.7000 100,000.00 70,000.00
Tukang OH 0.3500 110,000.00 38,500.00
Kepala Tukang OH 0.0350 120,000.00 4,200.00
Mandor OH 0.0350 120,000.00 4,200.00
Jumlah Harga Tenaga Kerja 116,900.00

B. BAHAN
Multiplek t= 9 mm M2 1.1000 46,875.00 51,562.50
Paku Khususs Bh 6.0000 1,000.00
Jumlah Harga Bahan 51,562.50

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00

Jumlah Harga Peralatan 17,500.00


D. Jumlah (A + B + C) 185,962.50
E. Keuntungan Maksimal 10% 10% 18,596.25
F. Jumlah (D + E) 204,558.75
G. Dibulatkan 204,558.00
A.4.2.1.11
62 1 M1 PEK. PASANGAN KUSEN PINTU/ JENDELA ALUMUNIUM PROFIL NATURAL 3"
A. TENAGA KERJA
Pekerja OH 0.0430 100,000.00 4,300.00
Tukang OH 0.0430 110,000.00 4,730.00
Kepala Tukang OH 0.0043 120,000.00 516.00
Mandor OH 0.0021 120,000.00 252.00
Jumlah Harga Tenaga Kerja 9,798.00

B. BAHAN
Almunium Profil Natral (Bahan Kusen) 3" Set. Alexcindo M1 1.1000 95,000.00 104,500.00
Skrup Pixer Bh 2.0000 650.00 1,300.00
Sealant Tube 0.0600 30,000.00 1,800.00
Jumlah Harga Bahan 107,600.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 117,398.00
E. Keuntungan Maksimal 10% 10% 11,739.80
F. Jumlah (D + E) 129,137.80
G. Dibulatkan 129,137.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

63 1 M1 PEK. PASANGAN KUSEN PINTU/ JENDELA ALUMUNIUM PROFIL NATURAL 4"


A. TENAGA KERJA
Pekerja OH 0.0430 100,000.00 4,300.00
Tukang OH 0.0430 110,000.00 4,730.00
Kepala Tukang OH 0.0043 120,000.00 516.00
Mandor OH 0.0021 120,000.00 252.00
Jumlah Harga Tenaga Kerja 9,798.00

B. BAHAN
Almunium Profil Natral (Bahan Kusen) 4" Set. Alexcindo M1 1.1000 125,000.00 137,500.00
Skrup Pixer Bh 2.0000 650.00 1,300.00
Sealant Tube 0.0600 30,000.00 1,800.00
Jumlah Harga Bahan 140,600.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 150,398.00
E. Keuntungan Maksimal 10% 10% 15,039.80
F. Jumlah (D + E) 165,437.80
G. Dibulatkan 165,437.00

64 1 M2 PEK. PASANGAN FRAME RANGKA PINTU KACA ALUMUNIUM


A. TENAGA KERJA
Pekerja OH 0.0850 100,000.00 8,500.00
Tukang OH 0.0850 110,000.00 9,350.00
Kepala Tukang OH 0.0090 120,000.00 1,080.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 19,530.00

B. BAHAN
Frame Kaca Alumunium Warna M1 4.5000 30,000.00 135,000.00
Sealant Tube 0.2700 30,000.00 8,100.00
Jumlah Harga Bahan 143,100.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 162,630.00
E. Keuntungan Maksimal 10% 10% 16,263.00
F. Jumlah (D + E) 178,893.00
G. Dibulatkan 178,893.00
A.4.6.2.4
65 1 BH PEK. MEMASANG KUNCI PINTU SLINDER ALFA
A. TENAGA KERJA
Pekerja OH 0.0600 100,000.00 6,000.00
Tukang OH 0.6000 110,000.00 66,000.00
Kepala Tukang OH 0.0600 120,000.00 7,200.00
Mandor OH 0.0030 120,000.00 360.00
Jumlah Harga Tenaga Kerja 79,560.00

B. BAHAN
Kunci Slinder Alfa Unit 1.0000 350,000.00 350,000.00

Jumlah Harga Bahan 350,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 429,560.00
E. Keuntungan Maksimal 10% 10% 42,956.00
F. Jumlah (D + E) 472,516.00
G. Dibulatkan 472,510.00

66 1 BH PEK. MEMASANG KUNCI PINTU 2 SLAAG


A. TENAGA KERJA
Pekerja OH 0.0600 100,000.00 6,000.00
Tukang OH 0.6000 110,000.00 66,000.00
Kepala Tukang OH 0.0600 120,000.00 7,200.00
Mandor OH 0.0030 120,000.00 360.00
Jumlah Harga Tenaga Kerja 79,560.00

B. BAHAN
Kunci Pintu 2 Slaag Unit 1.0000 170,000.00 170,000.00

Jumlah Harga Bahan 170,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 249,560.00
E. Keuntungan Maksimal 10% 10% 24,956.00
F. Jumlah (D + E) 274,516.00
G. Dibulatkan 274,510.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
A.4.6.2.5
68 1 BH PEK. MEMASANG ENGSEL PINTU
A. TENAGA KERJA
Pekerja OH 0.0150 100,000.00 1,500.00
Tukang OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0008 120,000.00 96.00
Jumlah Harga Tenaga Kerja 19,896.00

B. BAHAN
Engsel Pintu Bh 1.0000 35,000.00 35,000.00

Jumlah Harga Bahan 35,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 54,896.00
E. Keuntungan Maksimal 10% 10% 5,489.60
F. Jumlah (D + E) 60,385.60
G. Dibulatkan 60,385.00
A.4.6.2.8
69 1 BH PEK. MEMASANG ENGSEL JENDELA
A. TENAGA KERJA
Pekerja OH 0.0150 100,000.00 1,500.00
Tukang OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0008 120,000.00 96.00
Jumlah Harga Tenaga Kerja 19,896.00

B. BAHAN
Engsel Jendela Bh 1.0000 35,000.00 35,000.00

Jumlah Harga Bahan 35,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 54,896.00
E. Keuntungan Maksimal 10% 10% 5,489.60
F. Jumlah (D + E) 60,385.60
G. Dibulatkan 60,385.00
A.4.6.2.10
70 1 BH PEK. MEMASANG DOOR CLOSER
A. TENAGA KERJA
Pekerja OH 0.0500 100,000.00 5,000.00
Tukang OH 0.5000 110,000.00 55,000.00
Kepala Tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0030 120,000.00 360.00
Jumlah Harga Tenaga Kerja 66,360.00

B. BAHAN
Doorcloser Bh 1.0000 90,000.00 90,000.00

Jumlah Harga Bahan 90,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 156,360.00
E. Keuntungan Maksimal 10% 10% 15,636.00
F. Jumlah (D + E) 171,996.00
G. Dibulatkan 171,996.00

71 1 BH PEK. MEMASANG SLOOT PINTU


A. TENAGA KERJA
Pekerja OH 0.0200 100,000.00 2,000.00
Tukang OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0010 120,000.00 120.00
Jumlah Harga Tenaga Kerja 26,520.00

B. BAHAN
Slot Pintu Bh 1.0000 25,000.00 25,000.00

Jumlah Harga Bahan 25,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 51,520.00
E. Keuntungan Maksimal 10% 10% 5,152.00
F. Jumlah (D + E) 56,672.00
G. Dibulatkan 56,672.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

72 1 BH PEK. MEMASANG SLOOT JENDELA


A. TENAGA KERJA
Pekerja OH 0.0200 100,000.00 2,000.00
Tukang OH 0.2000 110,000.00 22,000.00
Kepala Tukang OH 0.0200 120,000.00 2,400.00
Mandor OH 0.0010 120,000.00 120.00
Jumlah Harga Tenaga Kerja 26,520.00

B. BAHAN
Slot Jendela Bh 1.0000 25,000.00 25,000.00

Jumlah Harga Bahan 25,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 51,520.00
E. Keuntungan Maksimal 10% 10% 5,152.00
F. Jumlah (D + E) 56,672.00
G. Dibulatkan 56,672.00
A.4.6.2.17
73 1 M2 PEK. MEMASANG KACA POLOS T = 5MM
A. TENAGA KERJA
Pekerja OH 0.0150 100,000.00 1,500.00
Tukang OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0008 120,000.00 96.00
Jumlah Harga Tenaga Kerja 19,896.00

B. BAHAN
Kaca Polos t = 5 mm, Setara ASAHI M2 1.0000 115,000.00 115,000.00
Karet Kaca M1 1.0000 12,500.00 12,500.00
Jumlah Harga Bahan 127,500.00

C. PERALATAN
Alat bantu Ls 1.0000 17,500.00 17,500.00
-
Jumlah Harga Peralatan 17,500.00
D. Jumlah (A + B + C) 164,896.00
E. Keuntungan Maksimal 10% 10% 16,489.60
F. Jumlah (D + E) 181,385.60
G. Dibulatkan 181,385.00

74 1 BH PEK. MEMASANG TARIKAN PINTU


A. TENAGA KERJA
Pekerja OH 0.0150 100,000.00 1,500.00
Tukang OH 0.1500 110,000.00 16,500.00
Kepala Tukang OH 0.0150 120,000.00 1,800.00
Mandor OH 0.0008 120,000.00 96.00
Jumlah Harga Tenaga Kerja 19,896.00

B. BAHAN
Tarikan Pintu Bh 1.0000 85,000.00 85,000.00
Jumlah Harga Bahan 85,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 104,896.00
E. Keuntungan Maksimal 10% 10% 10,489.60
F. Jumlah (D + E) 115,385.60
G. Dibulatkan 115,385.00

1 1 CM PEMASANGAN PAPANNAMA T=9CM (STAINLESS)


A. TENAGA KERJA
Upah Pasang (20%) Ls 1.0000 2,000.00 2,000.00

Jumlah Harga Tenaga Kerja 2,000.00

B. BAHAN
Stainless T= 9Cm Cm 1.0000 10,000.00 10,000.00
-
Jumlah Harga Bahan 10,000.00

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00
-
Jumlah Harga Peralatan 17,500.00
D. Jumlah (A + B + C) 29,500.00
E. Keuntungan Maksimal 10% 10% 2,950.00
F. Jumlah (D + E) 32,450.00
G. Dibulatkan 32,450.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

77 1 UNIT PEK. PASANG PINTU KAMAR MANDI PVC KUALITAS BAIK (P.3)
A. TENAGA KERJA
Ongkos Kerja (30% dari Harga Bahan) Ls 1.0000 114,000.00 114,000.00

Jumlah Harga Tenaga Kerja 114,000.00

B. BAHAN
Pintu KM PVC (Lengkap dgn Kusen, Engsel, Slot dan Kunci) Bh 1.0000 570,000.00 570,000.00
-
Jumlah Harga Bahan 570,000.00

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00
-
Jumlah Harga Peralatan 17,500.00
D. Jumlah (A + B + C) 701,500.00
E. Keuntungan Maksimal 10% 10% 70,150.00
F. Jumlah (D + E) 771,650.00
G. Dibulatkan 771,650.00

79 1 M2 PEK. PASANG RANGKA PLAFOND BESI HOLLOW


A. TENAGA KERJA
Pekerja Oh 0.1500 100,000.00 15,000.00
Tukang Oh 0.2500 110,000.00 27,500.00
Kepala Tukang Oh 0.0250 120,000.00 3,000.00
Mandor Oh 0.0200 120,000.00 2,400.00
Jumlah Harga Tenaga Kerja 47,900.00

B. BAHAN
Besi Hollow 2 x 4 cm M1 1.0750 25,000.00 26,875.00
Besi Hollow 4 x 4 cm M1 1.0000 26,000.00 26,000.00
Gantungan Besi dia. 6 mm Kg 0.1750 2,500.00 437.50
Jumlah Harga Bahan 53,312.50

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00
-
Jumlah Harga Peralatan 17,500.00
D. Jumlah (A + B + C) 118,712.50
E. Keuntungan Maksimal 10% 10% -
F. Jumlah (D + E) 118,712.50
G. Dibulatkan 118,712.00

80 1 M2 PEK. PASANG PLAFOND GYPSUM T = 9 MM


A. TENAGA KERJA
Pekerja Oh 0.1000 100,000.00 10,000.00
Tukang Oh 0.0500 110,000.00 5,500.00
Kepala Tukang Oh 0.0050 120,000.00 600.00
Mandor Oh 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 16,700.00

B. BAHAN
Gypsum T = 9 mm, Set. Jayaboard Lbr 0.3640 125,000.00 45,500.00
Paku Gypsum Kg 0.1100 30,000.00 3,300.00
Jumlah Harga Bahan 48,800.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 65,500.00
E. Keuntungan Maksimal 10% 10% -
F. Jumlah (D + E) 65,500.00
G. Dibulatkan 65,500.00

81 1 M2 PEK. PASANG PLAFOND GRC BOARD T = 5 mm


A. TENAGA KERJA
Pekerja Oh 0.1000 100,000.00 10,000.00
Tukang Oh 0.0500 110,000.00 5,500.00
Kepala Tukang Oh 0.0050 120,000.00 600.00
Mandor Oh 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 16,700.00

B. BAHAN
GRC Board, t = 5 mm Lbr 0.3640 65,000.00 23,660.00
Paku Gypsum Kg 0.1100 30,000.00 3,300.00
Jumlah Harga Bahan 26,960.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 43,660.00
E. Keuntungan Maksimal 10% 10% -
F. Jumlah (D + E) 43,660.00
G. Dibulatkan 43,660.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

82 1 M1 PEK. PASANG LIST PLAFOND LIST PROFIL GYPSUM T = 10 CM


A. TENAGA KERJA
Pekerja Oh 0.0460 100,000.00 4,600.00
Tukang Oh 0.1100 110,000.00 12,100.00
Kepala Tukang Oh 0.0110 120,000.00 1,320.00
Mandor Oh 0.0011 120,000.00 132.00
Jumlah Harga Tenaga Kerja 18,152.00

B. BAHAN
List Profile Gypsum t = 10 Cm M1 1.1000 15,000.00 16,500.00
Tepung Gypsum Kg 0.1500 6,500.00 975.00
Jumlah Harga Bahan 17,475.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 35,627.00
E. Keuntungan Maksimal 10% 10% -
F. Jumlah (D + E) 35,627.00
G. Dibulatkan 35,627.00

84 1 M2 PEK. PENGECATAN PLAFOND BARU (3X) VINILEX


A. TENAGA KERJA
Pekerja OH 0.0300 100,000.00 3,000.00
Tukang Cat OH 0.0750 110,000.00 8,250.00
Kepala Tukang OH 0.0075 120,000.00 900.00
Mandor OH 0.0030 120,000.00 360.00
Jumlah Harga Tenaga Kerja 12,510.00

B. BAHAN
Cat Dasar Kg 0.1000 20,000.00 2,000.00
Cat Penutup, 2x, Set. Vinilex Kg 0.2800 95,000.00 26,600.00
Ampelas Lbr 0.1500 10,000.00 1,500.00
Roll Cat Bh 0.0100 25,000.00 250.00
Jumlah Harga Bahan 30,350.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 42,860.00
E. Keuntungan Maksimal 10% 10% 4,286.00
F. Jumlah (D + E) 47,146.00
G. Dibulatkan 47,146.00
A.4.7.1.10
85 1 M2 PEK. PENGECATAN TEMBOK BARU (3X) VINILEX
A. TENAGA KERJA
Pekerja OH 0.0200 100,000.00 2,000.00
Tukang Cat OH 0.0630 110,000.00 6,930.00
Kepala Tukang OH 0.0063 120,000.00 756.00
Mandor OH 0.0030 120,000.00 360.00
Jumlah Harga Tenaga Kerja 10,046.00

B. BAHAN
Plamuur Kg 0.1000 25,000.00 2,500.00
Cat Dasar Kg 0.1000 20,000.00 2,000.00
Cat Penutup, 2x, Set. Vinilex Kg 0.2600 95,000.00 24,700.00
Roll Cat Bh 0.0100 25,000.00 250.00
Jumlah Harga Bahan 29,450.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 39,496.00
E. Keuntungan Maksimal 10% 10% 3,949.60
F. Jumlah (D + E) 43,445.60
G. Dibulatkan 43,445.00

88 1 SET. PEK. PASANG BOX MCB


A. TENAGA KERJA
Pekerja OH 0.1500 100,000.00 15,000.00
Tukang OH 1.5000 110,000.00 165,000.00
Kepala Tukang OH 0.1500 120,000.00 18,000.00
Mandor OH 0.0150 120,000.00 1,800.00
Jumlah Harga Tenaga Kerja 199,800.00

B. BAHAN
Box MCB Set. Broco Bh 1.0000 125,000.00 125,000.00
MCB 4 Ampere Set. Marleen Garleen Bh 2.0000 90,000.00 180,000.00
Kabel NYHF 3 x 2.5 mm M1 4.0000 12,000.00 48,000.00
Jumlah Harga Bahan 353,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 552,800.00
E. Keuntungan Maksimal 10% 10% 55,280.00
F. Jumlah (D + E) 608,080.00
G. Dibulatkan 608,080.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

89 1 TITIK PEK. PASANG INSTALASI TITIK LAMPU


A. TENAGA KERJA
Pekerja OH 0.0500 100,000.00 5,000.00
Tukang OH 0.5000 110,000.00 55,000.00
Kepala Tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 66,600.00

B. BAHAN
Kabel NYM 3 x 2.5 mm2 (1 Roll = 50 m1) Set. Prima M1 7.0000 10,000.00 70,000.00
Klem 5/8" Bh 4.0000 5,000.00 20,000.00
T Dus Bh 1.0000 3,500.00 3,500.00
Isolasi Bh 0.1000 2,500.00 250.00
Pipa PVC 5/8" M1 4.0000 4,500.00 18,000.00
Knie 5/8" Bh 1.0000 2,000.00 2,000.00
Jumlah Harga Bahan 113,750.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 180,350.00
E. Keuntungan Maksimal 10% 10% 18,035.00
F. Jumlah (D + E) 198,385.00
G. Dibulatkan 198,385.00

90 1 TITIK PEK. PASANG INSTALASI TITIK STOP KONTAK/ DAYA


A. TENAGA KERJA
Pekerja OH 0.0500 100,000.00 5,000.00
Tukang OH 0.5000 110,000.00 55,000.00
Kepala Tukang OH 0.0500 120,000.00 6,000.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 66,600.00

B. BAHAN
Kabel NYM 3 x 2.5 mm2 (1 Roll = 50 m1) Set. Prima M1 7.0000 10,000.00 70,000.00
T Dus Bh 1.0000 3,500.00 3,500.00
L Bow Bh 1.0000 3,000.00 3,000.00
Isolasi Bh 0.1000 2,500.00 250.00
Pipa PVC 5/8" M1 6.0000 4,500.00 27,000.00
Jumlah Harga Bahan 103,750.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 170,350.00
E. Keuntungan Maksimal 10% 10% 17,035.00
F. Jumlah (D + E) 187,385.00
G. Dibulatkan 187,385.00

91 1 BH PEK. PASANG STOP KONTAK


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Stop Kontak Set. Broco Bh 1.0000 30,000.00 30,000.00

Jumlah Harga Bahan 30,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 42,132.00
E. Keuntungan Maksimal 10% 10% 4,213.20
F. Jumlah (D + E) 46,345.20
G. Dibulatkan 46,345.00

92 1 BH PEK. PASANG SAKLAR TUNGGAL


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Saklar Tunggal Set. Broco Bh 1.0000 25,000.00 25,000.00

Jumlah Harga Bahan 25,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 37,132.00
E. Keuntungan Maksimal 10% 10% 3,713.20
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
F. Jumlah (D + E) 40,845.20
G. Dibulatkan 40,845.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

93 1 BH PEK. PASANG SAKLAR GANDA


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Saklar Double Set. Broco Bh 1.0000 30,000.00 30,000.00

Jumlah Harga Bahan 30,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 42,132.00
E. Keuntungan Maksimal 10% 10% 4,213.20
F. Jumlah (D + E) 46,345.20
G. Dibulatkan 46,345.00

94 1 BH PEK. PASANG SAKLAR TRIPLE


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Saklar Triple Set. Broco Bh 1.0000 35,000.00 35,000.00

Jumlah Harga Bahan 35,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 47,132.00
E. Keuntungan Maksimal 10% 10% 4,713.20
F. Jumlah (D + E) 51,845.20
G. Dibulatkan 51,845.00

85 1 TITIK PEK. PASANG LAMPU TL 2X18 RM300 ACRYLIC


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Lampu TL 2 x 18 Watt RM 300 acrylic Bh 1.0000 275,000.00 275,000.00
Fitting Bh 1.0000 7,500.00 7,500.00
Jumlah Harga Bahan 282,500.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 294,632.00
E. Keuntungan Maksimal 10% 10% 29,463.20
F. Jumlah (D + E) 324,095.20
G. Dibulatkan 324,095.00

88 1 TITIK PEK. PASANG LAMPU DOWNLIGHT PLE 20 W


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Lampu SL 18 Watt, Set. Philips Bh 1.0000 125,000.00 125,000.00
Fitting Bh 1.0000 7,500.00 7,500.00
Jumlah Harga Bahan 132,500.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 144,632.00
E. Keuntungan Maksimal 10% 10% 14,463.20
F. Jumlah (D + E) 159,095.20
G. Dibulatkan 159,095.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

89 1 TITIK PEK. PASANG LAMPU SL 18 WATT


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Lampu SL 18 Watt, Set. Philips Bh 1.0000 45,000.00 45,000.00
Fitting Bh 1.0000 7,500.00 7,500.00
Jumlah Harga Bahan 52,500.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 64,632.00
E. Keuntungan Maksimal 10% 10% 6,463.20
F. Jumlah (D + E) 71,095.20
G. Dibulatkan 71,095.00

90 1 UNIT LAMPU TL 1 x 36 WATT SETARA PHILIP + ARMATUR TKO


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Armatur Lampu 1 x 36 Watt TKO Unit 1.0000 175,000.00 175,000.00
Lampu TL 36 Watt Setara Phillip Bh 1.0000 60,000.00 60,000.00
Jumlah Harga Bahan 235,000.00

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00
-
Jumlah Harga Peralatan 17,500.00
D. Jumlah (A + B + C) 264,632.00
E. Keuntungan Maksimal 10% 10% 26,463.20
F. Jumlah (D + E) 291,095.20
G. Dibulatkan 291,095.00
A.5.1.1.29
95 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 2" SET. MASPION
A. TENAGA KERJA
Pekerja OH 0.0360 100,000.00 3,600.00
Tukang OH 0.0600 110,000.00 6,600.00
Kepala Tukang OH 0.0060 120,000.00 720.00
Mandor OH 0.0018 120,000.00 216.00
Jumlah Harga Tenaga Kerja 11,136.00

B. BAHAN
Pipa PVC 2" AW Set. Maspion Btg 0.3000 65,000.00 19,500.00
Perlengkapan + Aksesoris (35% x Harga Bahan) Ls 1.0000 3,900.00 3,900.00
Jumlah Harga Bahan 23,400.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 34,536.00
E. Keuntungan Maksimal 10% 10% 3,453.60
F. Jumlah (D + E) 37,989.60
G. Dibulatkan 37,989.00
A.5.1.1.31
96 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 3" SET. MASPION
A. TENAGA KERJA
Pekerja OH 0.0360 100,000.00 3,600.00
Tukang OH 0.0600 110,000.00 6,600.00
Kepala Tukang OH 0.0060 120,000.00 720.00
Mandor OH 0.0018 120,000.00 216.00
Jumlah Harga Tenaga Kerja 11,136.00

B. BAHAN
Pipa PVC 3" AW Set. Maspion Btg 0.3000 105,000.00 31,500.00
Perlengkapan + Aksesoris (35% x Harga Bahan) Ls 1.0000 11,025.00 11,025.00
Jumlah Harga Bahan 42,525.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 53,661.00
E. Keuntungan Maksimal 10% 10% 5,366.10
F. Jumlah (D + E) 59,027.10
G. Dibulatkan 59,027.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
A.5.1.1.31
97 1 M1 PEK. PASANG PIPA PVC. TYPE AW DIA. 4" SET. MASPION
A. TENAGA KERJA
Pekerja OH 0.0360 100,000.00 3,600.00
Tukang OH 0.0600 110,000.00 6,600.00
Kepala Tukang OH 0.0060 120,000.00 720.00
Mandor OH 0.0018 120,000.00 216.00
Jumlah Harga Tenaga Kerja 11,136.00

B. BAHAN
Pipa PVC 4" AW Set. Maspion Btg 0.3000 210,000.00 63,000.00
Perlengkapan + Aksesoris (35% x Harga Bahan) Ls 1.0000 18,900.00 18,900.00
Jumlah Harga Bahan 81,900.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 93,036.00
E. Keuntungan Maksimal 10% 10% 9,303.60
F. Jumlah (D + E) 102,339.60
G. Dibulatkan 102,339.00

99 1 BH PEK. PASANG KRAN AIR DIA. 1/2" ATAU 3/4"


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 13,800.00

B. BAHAN
Kran Air 1/2" Bh 1.0000 60,000.00 60,000.00
Solatip Bh 0.0250 5,000.00 125.00
Jumlah Harga Bahan 60,125.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 73,925.00
E. Keuntungan Maksimal 10% 10% 7,392.50
F. Jumlah (D + E) 81,317.50
G. Dibulatkan 81,317.00
A.5.1.1.14
101 1 BH PEK. PASANG FLOOR DRAIN
A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0100 120,000.00 1,200.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 13,800.00

B. BAHAN
Floor Drain Bh 1.0000 135,000.00 135,000.00

Jumlah Harga Bahan 135,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 148,800.00
E. Keuntungan Maksimal 10% 10% 14,880.00
F. Jumlah (D + E) 163,680.00
G. Dibulatkan 163,680.00
A.5.1.1.2
103 1 BH PEK. PASANG CLOSET JONGKOK
A. TENAGA KERJA
Pekerja OH 1.0000 100,000.00 100,000.00
Tukang OH 1.5000 110,000.00 165,000.00
Kepala Tukang OH 0.1500 120,000.00 18,000.00
Mandor OH 0.1600 120,000.00 19,200.00
Jumlah Harga Tenaga Kerja 302,200.00

B. BAHAN
Kloset Jongkok Set. Toto Bh 1.0000 350,000.00 350,000.00
Semen PC Zak 0.1200 55,650.00 6,678.00
Pasir Pasang M3 0.0100 275,000.00 2,750.00
Jumlah Harga Bahan 359,428.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 661,628.00
E. Keuntungan Maksimal 10% 10% 66,162.80
F. Jumlah (D + E) 727,790.80
G. Dibulatkan 727,790.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

107 1 M1 PEK. PASANG GRAVEL U. 1/2 DIA. 30 CM


A. TENAGA KERJA
Pekerja OH 0.0500 100,000.00 5,000.00
Mandor OH 0.0050 120,000.00 600.00
Jumlah Harga Tenaga Kerja 5,600.00

B. BAHAN
Gravel U. 1/2 dia. 30 cm Bh 1.0000 60,000.00 60,000.00
Portlan Semen 50 Kg Zak 0.0143 55,650.00 795.80
Pasir Pasang M3 0.0051 275,000.00 1,402.50
Jumlah Harga Bahan 62,198.30

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 67,798.30
E. Keuntungan Maksimal 10% 10% 6,779.83
F. Jumlah (D + E) 74,578.12
G. Dibulatkan 74,578.00

108 1 M2 PEK. PASANG PAVING BLOCK NATURAL T = 8 CM


A. TENAGA KERJA
Pekerja OH 0.2500 100,000.00 25,000.00
Tukang OH 0.5000 110,000.00 55,000.00
Kepala Tukang OH 0.0250 120,000.00 3,000.00
Mandor OH 0.0030 120,000.00 360.00
Jumlah Harga Tenaga Kerja 83,360.00

B. BAHAN
Paving Block Natural T = 8 cm K. 275 M2 1.0100 85,000.00 85,850.00
Pasir Beton M3 0.1000 375,000.00 37,500.00
Jumlah Harga Bahan 123,350.00

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00

Jumlah Harga Peralatan 17,500.00


D. Jumlah (A + B + C) 224,210.00
E. Keuntungan Maksimal 10% 10% 22,421.00
F. Jumlah (D + E) 246,631.00
G. Dibulatkan 246,631.00

109 1 M1 PEKERJAAN PASANG KASTEEN PAVING BLOCK UK. 10 X 20 X 35 CM


A. TENAGA KERJA
Pekerja OH 0.2500 100,000.00 25,000.00
Tukang OH 0.5000 110,000.00 55,000.00
Kepala Tukang OH 0.0250 120,000.00 3,000.00
Mandor OH 0.0030 120,000.00 360.00
Jumlah Harga Tenaga Kerja 83,360.00

B. BAHAN
Kansteen Paving Block Uk. 10 x 20 x 35 Cm Bh 2.8571 24,000.00 68,571.43
Pasir Beton M3 0.1000 375,000.00 37,500.00
Portlan Semen 50 Kg Zak 0.1600 55,650.00 8,904.00
Pasir Urug T = 5 Cm M3 0.0050 140,000.00 700.00
Jumlah Harga Bahan 115,675.43

C. PERALATAN
Alat Bantu Ls 1.0000 17,500.00 17,500.00

Jumlah Harga Peralatan 17,500.00


D. Jumlah (A + B + C) 216,535.43
E. Keuntungan Maksimal 10% 10% 21,653.54
F. Jumlah (D + E) 238,188.97
G. Dibulatkan 238,188.00

110 1 LS MOBILISASI DAN DEMOBILISASI ALAT DAN PERALATAN


A. TENAGA KERJA
Bongkar Muat (25% dari Total Biaya Peralatan) Ls 1.0000 379,375.00 379,375.00
-
Jumlah Harga Tenaga Kerja 379,375.00

B. BAHAN
-
-
Jumlah Harga Bahan -

C. PERALATAN
Sewa Truk Hari 2.0000 750,000.00 1,500,000.00
Alat bantu Ls 1.0000 17,500.00 17,500.00
Jumlah Harga Peralatan 1,517,500.00
D. Jumlah (A + B + C) 1,896,875.00
E. Keuntungan Maksimal 10% 10% 189,687.50
F. Jumlah (D + E) 2,086,562.50
G. Dibulatkan 2,086,560.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

111 1 M1 PEMBORAN PILOT HOLE DIA. 4".


A. TENAGA KERJA
Juru Bor OH 0.2000 120,000.00 24,000.00
Pembantu Juru Bor OH 0.1500 100,000.00 15,000.00
Jumlah Harga Tenaga Kerja 39,000.00

B. BAHAN
Pelumas Ltr 0.1600 30,000.00 4,800.00
Solar Ltr 0.8000 11,200.00 8,960.00
Jumlah Harga Bahan 13,760.00

C. PERALATAN
Mesin Bor dan Peralatannya Unit 0.0067 12,000,000.00 80,400.00
-
Jumlah Harga Peralatan 80,400.00
D. Jumlah (A + B + C) 133,160.00
E. Keuntungan Maksimal 10% 10% 13,316.00
F. Jumlah (D + E) 146,476.00
G. Dibulatkan 146,470.00

112 1 M1 PEMBESARAN LUBANG BOR DIA. 4"


A. TENAGA KERJA
Juru Bor OH 0.1250 120,000.00 15,000.00
Pembantu Juru Bor OH 0.1000 100,000.00 10,000.00
Jumlah Harga Tenaga Kerja 25,000.00

B. BAHAN
Pelumas Ltr 0.2800 30,000.00 8,400.00
Solar Ltr 1.4200 11,200.00 15,904.00
Jumlah Harga Bahan 24,304.00

C. PERALATAN
Mesin Bor dan Peralatannya Unit 0.0060 12,000,000.00 72,000.00
-
Jumlah Harga Peralatan 72,000.00
D. Jumlah (A + B + C) 121,304.00
E. Keuntungan Maksimal 10% 10% 12,130.40
F. Jumlah (D + E) 133,434.40
G. Dibulatkan 133,430.00

113 1 M1 PEK. PAS. KONSTRUKSI SUMUR/ PIPA PVC AW DIA 4" SET. MASPION (CASSING)
A. TENAGA KERJA
Ongkos Kerja (15% x Harga Bahan) Ls 1.0000 12,468.75 12,468.75
-
Jumlah Harga Tenaga Kerja 12,468.75

B. BAHAN
Pipa PVC dia. 4" AW Set. Maspion Btg 0.3000 210,000.00 63,000.00
Lem PVC Tube 0.3500 10,000.00 3,500.00
Perlengkapan (25% x Harga Bahan) Ls 1.0000 16,625.00 16,625.00
Jumlah Harga Bahan 83,125.00

C. PERALATAN
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 95,593.75
E. Keuntungan Maksimal 10% 10% 9,559.38
F. Jumlah (D + E) 105,153.13
G. Dibulatkan 105,150.00

114 1 M1 PEK. PAS. KONSTRUKSI SARINGAN PVC AW DIA 3" SET. MASPION
A. TENAGA KERJA
Ongkos Kerja (15% x Harga Bahan) Ls 1.0000 5,486.25 5,486.25
-
5,486.25

B. BAHAN
Pipa PVC dia. 3" AW (Berlubang) Set. Maspion Btg 0.3000 105,000.00 31,500.00
Lem PVC Tube 0.1750 10,000.00 1,750.00
Perlengkapan (10% x Harga Bahan) Ls 1.0000 3,325.00 3,325.00
Jumlah Harga Bahan 36,575.00

C. PERALATAN
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 42,061.25
E. Keuntungan Maksimal 10% 10% 4,206.13
F. Jumlah (D + E) 46,267.38
G. Dibulatkan 46,260.00

115 1 M1 PEK. PASANG PIPA NAIK DAN INLET PVC DIA. 1"
A. TENAGA KERJA
Ongkos Kerja (15% x Harga Bahan) Ls 1.0000 6,240.00 6,240.00
-
Jumlah Harga Tenaga Kerja 6,240.00

B. BAHAN
Pipa Pvc Dia. 1" Btg 0.2000 55,000.00 11,000.00
Perlengkapan (10% x Harga Bahan) Ls 1.0000 1,100.00 1,100.00
Jumlah Harga Bahan 12,100.00

C. PERALATAN
Mesin/ Peralatan Katrol Unit 0.0080 1,500,000.00 12,000.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
Alat bantu Ls 1.0000 17,500.00 17,500.00
Jumlah Harga Peralatan 29,500.00
D. Jumlah (A + B + C) 47,840.00
E. Keuntungan Maksimal 10% 10% 4,784.00
F. Jumlah (D + E) 52,624.00
G. Dibulatkan 52,620.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

116 1 M3 PEK. URUGAN KERIKIL/ GARVEL PACK


A. TENAGA KERJA
Pekerja OH 1.0000 100,000.00 100,000.00
Tukang OH 0.3000 110,000.00 33,000.00
Juru Bor OH 0.0300 120,000.00 3,600.00
Jumlah Harga Tenaga Kerja 136,600.00

B. BAHAN
Kerikil/ Gravel Pack M3 1.2000 325,000.00 390,000.00
-
Jumlah Harga Bahan 390,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 526,600.00
E. Keuntungan Maksimal 10% 10% 52,660.00
F. Jumlah (D + E) 579,260.00
G. Dibulatkan 579,260.00

117 1 UNIT PASANG POMPA SUBMERSIBLE 1 PK


A. TENAGA KERJA
Ongkos Kerja (15% x Harga Bahan) Ls 1.0000 600,000.00 600,000.00
-
Jumlah Harga Tenaga Kerja 600,000.00

B. BAHAN
Pompa Submersible 1 PK Unit 1.0000 4,000,000.00 4,000,000.00
-
Jumlah Harga Bahan 4,000,000.00

C. PERALATAN
Mesin/ Peralatan Katrol Lot 0.1250 1,500,000.00 187,500.00
-
Jumlah Harga Peralatan 187,500.00
D. Jumlah (A + B + C) 4,787,500.00
E. Keuntungan Maksimal 10% 10% 478,750.00
F. Jumlah (D + E) 5,266,250.00
G. Dibulatkan 5,266,250.00

118 1 UNIT PASANG POMPA SUBMERSIBLE 1,5 PK


A. TENAGA KERJA
Ongkos Kerja (15% x Harga Bahan) Ls 1.0000 750,000.00 750,000.00
-
Jumlah Harga Tenaga Kerja 750,000.00

B. BAHAN
Pompa Submersible 1,5 PK Unit 1.0000 5,000,000.00 5,000,000.00
-
Jumlah Harga Bahan 5,000,000.00

C. PERALATAN
Mesin/ Peralatan Katrol Lot 0.1250 1,500,000.00 187,500.00
-
Jumlah Harga Peralatan 187,500.00
D. Jumlah (A + B + C) 5,937,500.00
E. Keuntungan Maksimal 10% 10% 593,750.00
F. Jumlah (D + E) 6,531,250.00
G. Dibulatkan 6,531,250.00

119 1 M1 PEK. PASANG KABEL POWER DAN ELEKTRODA


A. TENAGA KERJA
Ongkos Kerja (15% x Harga Bahan) Ls 1.0000 3,965.63 3,965.63
-
Jumlah Harga Tenaga Kerja 3,965.63

B. BAHAN
Kabel Power NYY HY 3 X 4 mm Sekualitas Prima M1 1.1000 13,500.00 14,850.00
Kabel Elektroda NYY HY 3 x 1,5 mm Sekualitas Prima M1 1.1000 9,500.00 10,450.00
Elektroda ( 4 BH ) Bh 0.0650 17,500.00 1,137.50
Jumlah Harga Bahan 26,437.50

C. PERALATAN
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 30,403.13
E. Keuntungan Maksimal 10% 10% 3,040.31
F. Jumlah (D + E) 33,443.44
G. Dibulatkan 33,440.00
1 1 M3 PEK. PONDASI TELAPAK (PS.1) UK. 80 X 80 X 25 CM BETON BERTULANG K. 225 (Site Mix)
Beton Site Mix K. 225 M3 1.0000 1,258,870.00 1,258,870.00
Besi Beton Polos dia. Ø12 mm Kg 128.6264 19,532.00 2,512,330.84
Bekisting Papan u/ Pondasi (2xpakai) M2 5.0000 79,660.00 398,300.00
Jumlah 5.00 4,169,500.84
Dibulatkan 4,169,500.00
2 1 M3 PEK. PONDASI TELAPAK (PS.2) UK. 60 X 60 X 20 CM BETON BERTULANG K. 175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton Polos dia. Ø12 mm Kg 141.2532 19,532.00 2,758,957.50
Bekisting Papan u/ Pondasi (2xpakai) M2 6.6667 79,660.00 531,069.32
Jumlah 8.33 4,506,918.82
Dibulatkan 4,506,918.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
3 1 M3 PEK. PONDASI TELAPAK (PS.3) UK. 40 X 40 X 20 CM BETON BERTULANG K. 175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton Polos dia. Ø12 mm Kg 180.5408 19,532.00 3,526,322.91
Bekisting Papan u/ Pondasi (2xpakai) M2 10.0000 79,660.00 796,600.00
Jumlah 12.50 5,539,814.91
Dibulatkan 5,539,814.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

4 1 M3 PEK. SLOOF (S.1) UK. 20 X 30 CM BETON BERTULANG K.225 (Site Mix)


Beton Site Mix K. 225 M3 1.0000 1,258,870.00 1,258,870.00
Besi Beton 4 Ø12 mm Kg 59.4444 19,532.00 1,161,068.89
Besi Beton Ø8 - 150 mm Kg 44.2839 19,532.00 864,952.92
Bekisting Papan u/ Sloof (2xpakai) M2 13.3333 83,099.50 1,107,990.56
Jumlah 33.3333 4,392,882.37
Dibulatkan 4,392,882.00

5 1 M3 PEK. SLOOF (S.2) UK. 15 X 20 CM BETON BERTULANG K.175 (Site Mix)


Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 118.8933 19,532.00 2,322,223.94
Besi Beton Ø8 - 150 mm Kg 61.7209 19,532.00 1,205,532.62
Bekisting Papan u/ Sloof (2xpakai) M2 13.3333 83,099.50 1,107,990.56
Jumlah 33.3333 5,852,639.12
Dibulatkan 5,852,639.00

6 1 M3 PEK. KOLOM PEDESTAL (KPDL.1) UK. 25 x 25 CM BETON BERTULANG K. 225 (Site Mix)
Beton Site Mix K. 225 M3 1.0000 1,258,870.00 1,258,870.00
Besi Beton 4 Ø12 mm Kg 57.0688 19,532.00 1,114,667.80
Besi Beton Ø8 - 150 mm Kg 42.5283 19,532.00 830,662.76
Jumlah 16.0000 3,204,200.56
Dibulatkan 3,204,200.00

7 1 M3 PEK. KOLOM PEDESTAL (KPDL.2) UK. 30 x 30 CM BETON BERTULANG K. 175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 39.6311 19,532.00 774,074.65
Besi Beton Ø8 - 150 mm Kg 35.5851 19,532.00 695,048.17
Jumlah 11.1111 2,686,014.82
Dibulatkan 2,686,014.00

8 1 M3 PEK. KOLOM PEDESTAL (KPDL.3) UK. 20 x 25 CM BETON BERTULANG K. 175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 71.3360 19,532.00 1,393,334.75
Besi Beton Ø8 - 150 mm Kg 47.7555 19,532.00 932,760.43
Jumlah 20.0000 3,542,987.18
Dibulatkan 3,542,987.00

9 1 M3 PEK. KOLOM PEDESTAL (KPDL.4) UK. 20 x 20 CM BETON BERTULANG K. 175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 89.1700 19,532.00 1,741,668.44
Besi Beton Ø8 - 150 mm Kg 52.9827 19,532.00 1,034,858.10
Jumlah 25.0000 3,993,418.54
Dibulatkan 3,993,418.00

10 1 M3 PEK. KOLOM (K.1) UK. 30 x 30 CM BETON BERTULANG K. 175 (Site Mix)


Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 39.6444 19,532.00 774,334.42
Besi Beton Ø8 - 150 mm Kg 35.5851 19,532.00 695,048.17
Jumlah 11.1111 2,686,274.59
Dibulatkan 2,686,274.00

11 1 M3 PEK. KOLOM (K.2) UK. 20 x 25 CM BETON BERTULANG K. 175 (Site Mix)


Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 71.3600 19,532.00 1,393,803.52
Besi Beton Ø8 - 150 mm Kg 47.7555 19,532.00 932,760.43
Jumlah 20.0000 3,543,455.95
Dibulatkan 3,543,455.00

12 1 M3 PEK. KOLOM PEDESTAL UK. 15 x 25 CM BETON BERTULANG K. 225 (Site Mix)


Beton Site Mix K. 225 M3 1.0000 1,258,870.00 1,258,870.00
Besi Beton 4 Ø12 mm Kg 95.1111 19,532.00 1,857,710.22
Besi Beton Ø8 - 150 mm Kg 56.4938 19,532.00 1,103,436.47
Jumlah 26.666667 4,220,016.69
Dibulatkan 4,220,016.00

13 1 M3 PEK. KOLOM PRAKTIS (KP.1) UK. 15 x 15 CM BETON BERTULANG K. 225 (Site Mix)
Beton Site Mix K. 225 M3 1.0000 1,258,870.00 1,258,870.00
Besi Beton 4 Ø12 mm Kg 158.5244 19,532.00 3,096,298.58
Besi Beton Ø8 - 150 mm Kg 70.4592 19,532.00 1,376,209.09
Jumlah 44.4444 5,731,377.68
Dibulatkan 5,731,377.00
14 1 M3 PEK. KOLOM PRAKTIS (KP.2) UK. 15 x 15 CM BETON BERTULANG K. 175 (Site Mix)
Beton Site Mix K. 225 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 158.5244 19,532.00 3,096,298.58
Besi Beton Ø8 - 150 mm Kg 70.4592 19,532.00 1,376,209.09
Jumlah 44.4444 5,689,399.68
Dibulatkan 5,689,399.00

15 1 M3 PEK. BALOK (B.1) UK. 15 X 20 CM BETON BERTULANG K.225 (Site Mix)


Beton Site Mix K. 225 M3 1.0000 1,258,870.00 1,258,870.00
Besi Beton 4 Ø12 mm Kg 118.8933 19,532.00 2,322,223.94
Besi Beton Ø8 - 150 mm Kg 61.7209 19,532.00 1,205,532.62
Jumlah 33.3333 4,786,626.55
Dibulatkan 4,786,626.00

16 1 M3 PEK. RING BALK (RB.1) UK. 15 X 15 CM BETON BERTULANG K.175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 158.5244 19,532.00 3,096,298.58
Besi Beton Ø8 - 150 mm Kg 70.4592 19,532.00 1,376,209.09
Jumlah 44.4444 5,689,399.68
Dibulatkan 5,689,399.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
17 1 M3 PEK. RING BALK (RB.2) UK. 12 X 15 CM BETON BERTULANG K.175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø12 mm Kg 198.1556 19,532.00 3,870,375.18
Besi Beton Ø8 - 150 mm Kg 79.2133 19,532.00 1,547,194.18
Jumlah 55.5556 6,634,461.35
Dibulatkan 6,634,461.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

18 1 M3 PEK. BALOK LINTEL (BL.1) UK. 12 X 12 CM BETON BERTULANG K.175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø10 mm Kg 171.2963 19,532.00 3,345,759.26
Besi Beton Ø8 - 150 mm Kg 87.9674 19,532.00 1,718,179.26
Jumlah 69.4444 6,280,830.52
Dibulatkan 69.444444 6,280,830.00

19 1 M3 PEK. BALOK LINTEL (BL.2) UK. 10 X 10 CM BETON BERTULANG K.175 (Site Mix)
Beton Site Mix K. 175 M3 1.0000 1,216,892.00 1,216,892.00
Besi Beton 4 Ø10 mm Kg 246.6800 19,532.00 4,818,153.76
Besi Beton Ø8 - 150 mm Kg 105.4913 19,532.00 2,060,456.07
Jumlah 100.0000 8,095,501.83
Dibulatkan 8,095,501.00

20 1 UNIT PEK. BOUVENLIGH UK. 50 X 75 CM (BV)


Plat Besi T = 2 mm Kg 2.0275 37,290.00 75,605.48
Besi Begel dia. 10 mm Kg 4.1627 19,532.00 81,305.86
Pengelasan Cm 13.2740 4,943.00 65,613.38
Skrup Bh 14.0000 650.00 9,100.00
Pengecatan M2 0.3893 26,516.00 10,322.68
Pas. Ram Kawat Loket 1/2" x 1/2" M2 0.4400 53,900.00 23,716.00
Ongkos Pasang (15%) Ls 1.0000 36,292.11 36,292.11
Jumlah 301,955.50
Dibulatkan 301,955.00

21 1 M1 PEK. SALURAN GRAVEL 1/2 DIA. 30 CM + PAS. BATA MERAH


Galian Tanah Biasa M3 0.4225 85,800.00 36,250.50
Urugan Pasir M3 0.0650 219,120.00 14,242.80
Pas. Bata Merah ad. 1Pc : 4Ps M2 1.0000 190,374.00 190,374.00
Pas. Plesteran Topian ad. 1Pc : 4Ps M2 0.9000 70,009.00 63,008.10
Pas.Acian M2 0.9000 40,718.00 36,646.20
Pas. Adukan ad. 1Pc : 4Ps M3 0.0500 632,870.00 31,643.50
Pas. Gravel 1/2 dia. 30 cm M2 1.0000 74,578.00 74,578.00
Jumlah 446,743.10
Dibulatkan 446,743.00

30 1 UNIT PEKERJAAN SEPTICTANK UK 2,5 X 1,5 X 2 M


Galian Tanah M3 6.3750 104,940.00 668,992.50
Pasangan Bata Merah M2 16.1500 198,595.00 3,207,309.25
Plesteran + Acian M2 19.9000 114,396.00 2,276,480.40
Plat Lantai M3 0.7920 6,072,719.00 4,809,593.45
Urugan Batu Pecah 1/2" M3 0.2250 370,000.00 83,250.00
Urugan Batu Pecah 5/7" M3 0.3000 350,000.00 105,000.00
Urugan Pasir Beton M3 0.1500 375,000.00 56,250.00
Pipa PVC 4' M1 1.0000 59,027.00 59,027.00
!juk ls 1.0000 15,000.00 15,000.00
Buis Beton Dia 80 cm Bh 6.0000 135,000.00 810,000.00
Alat Bantu ls 1.0000 17,500.00 17,500.00

Jumlah 12,108,402.60
Dibulatkan 12,108,400.00

31 1 UNIT PEKERJAAN TOWER + TORN KAPASITAS 1M3


Pek. Galian Tanah Pondasi M3 0.5440 104,940.00 57,087.36
Pek. Urugan Pasir Urug, T = 5 cm M3 0.0640 219,120.00 14,023.68
Pek. Lantai Kerja Bawah Pondasi Telapak Beton Tumbuk Site Mix K. 100, T = 5 Cm M3 0.0320 1,070,352.00 34,251.26
Pek. Pondasi Telapak Uk. 40x40x20 cm Beton Bertulang Beton Site Mix K.175 M3 0.1280 5,539,814.00 709,096.19
Pek. Kolom Pedestal 20/20 cm Beton Bertulang Beton Site Mix K.175 M3 0.0960 3,993,418.00 383,368.13
Pek. Base Plat T = 1,2 mm uk. 15 x 15 cm Kg 0.8750 37,290.00 32,628.75
Pek. Pasang Angkur Dia. 14 mm Pj. 15 cm Bh 16.0000 42,350.00 677,600.00
Pek. Besi Siku L. 50.50.5 mm Kg 121.5000 33,701.00 4,094,671.50
Pek. Besi Siku L. 30.30.5 mm Kg 34.8160 33,701.00 1,173,334.02
Pek. Plat Besi Lantai Torn T = 1,2 mm Kg 17.5000 37,290.00 652,575.00
Pek. Pengelasan Cm 184.0000 4,943.00 909,512.00
Pek. Pengecatan Bidang Besi dgn Cat Besi set. Seiv M2 6.7976 26,516.00 180,245.16
Pek. Pasang Torn Kap. 1000 Ltr Unit 1.0000 1,750,000.00 1,750,000.00
Pek. Pasang Pipa Instalasi/ Distribusi PVC 3/4" M1 15.0000 30,069.00 451,035.00
Alat bantu Ls 1.0000 17,500.00 17,500.00
Jumlah 10,668,393.05
Dibulatkan 10,668,300.00

32 1 UNIT PEK. PEMBUATAN SUMUR DALAM SUMERSIBLE KEDALAMAN 60 M + KELENGKAPANNYA


Pekerjaann Sumersible
Pek. Persiapan Peralatan Bor Ls 1.0000 2,086,560.00 2,086,560.00
Pek. Pengeboran Sumur 0 - 60 m M1 60.0000 146,470.00 8,788,200.00
Pek. Pembesaran lubang Pengeboran Sumur 0 - 62 m M1 62.0000 133,430.00 8,272,660.00
Pek. Konstruksi Casing Sumur Pipa PVC AW. Dia 4" M1 48.0000 105,150.00 5,047,200.00
Pek. Konstruksi Saringan PVC Berlubang dia 3" Bh 12.0000 46,260.00 555,120.00
Pas. Grevel Pick Pembalut Jambangan (Cassing) M3 0.8171 579,260.00 473,313.35
Pek. Pengadaan dan Pemasangan Pipa Naik PVC 1" M1 56.0000 52,620.00 2,946,720.00
Pek. Pasang Pompa Submersible 1,5 PK Lengkap dengan WLC Unit 1.0000 6,531,250.00 6,531,250.00
Pek. Kabel Power NYY 3 x 4 mm dari Induk dan Kabel Electroda 3x1,5 mm M1 100.0000 33,440.00 3,344,000.00
Pek. Pengadaan dan Pemasangan Instrumen Panel Control Unit 1.0000 1,581,250.00 1,581,250.00
Jumlah 39,626,273.35
Dibulatkan 39,626,200.00

33 1 UNIT PEK. PINTU ALUMUNIUM 3' ( P3 ) Uk 85x270 Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 7.1000 129,137.00 916,872.70
Pek. Pasangan Frame Rangka Pintu Kaca Alumunium M2 1.5750 178,893.00 281,756.48
Pek. Pasangan Kaca 5mm M2 1.7750 181,385.00 321,958.38
Pek. Memasang Kunci Pintu Silinder Alfa Bh 1.0000 472,510.00 472,510.00
Pek.Memasang Engsel Pintu Bh 3.0000 60,385.00 181,155.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
Pek.Memasang Doorcloser Bh 1.0000 171,996.00 171,996.00
Pek.Memasang Sloot Pintu Bh 1.0000 56,672.00 56,672.00
Pek.Memasang Tarikan Pintu Bh 2.0000 115,385.00 230,770.00
Sealent Tube 2.8400 30,000.00 85,200.00
Jumlah 2,718,890.55
Dibulatkan 2,718,800.00
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)

34 1 UNIT PEK. PINTU ALUMUNIUM 3' ( P2 ) Uk 100x270 Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 7.4000 129,137.00 955,613.80
Pek. Pasangan Frame Rangka Pintu Kaca Alumunium M2 1.8900 178,893.00 338,107.77
Pek. Pasangan Kaca 5mm M2 2.2000 181,385.00 399,047.00
Pek. Memasang Kunci Pintu Silinder Alfa Bh 1.0000 472,510.00 472,510.00
Pek.Memasang Engsel Pintu Bh 3.0000 60,385.00 181,155.00
Pek.Memasang Doorcloser Bh 1.0000 171,996.00 171,996.00
Pek.Memasang Sloot Pintu Bh 1.0000 56,672.00 56,672.00
Pek.Memasang Tarikan Pintu Bh 2.0000 115,385.00 230,770.00
Sealent Tube 2.9600 30,000.00 88,800.00
Jumlah 2,894,671.57
Dibulatkan 2,894,600.00

35 1 UNIT PEK. PINTU ALUMUNIUM 3' ( P1 ) Uk. 170x270 Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 9.4000 129,137.00 1,213,887.80
Pek. Pasangan Frame Rangka Pintu Kaca Alumunium M2 3.3600 178,893.00 601,080.48
Pek. Pasangan Kaca 5mm M2 3.6000 181,385.00 652,986.00
Pek. Memasang Kunci Pintu Silinder Alfa Bh 1.0000 472,510.00 472,510.00
Pek.Memasang Engsel Pintu Bh 6.0000 60,385.00 362,310.00
Pek.Memasang Doorcloser Bh 1.0000 171,996.00 171,996.00
Pek.Memasang Sloot Pintu Bh 2.0000 56,672.00 113,344.00
Pek.Memasang Tarikan Pintu Bh 4.0000 115,385.00 461,540.00
Sealent Tube 3.7600 30,000.00 112,800.00
Jumlah 4,162,454.28
Dibulatkan 4,162,400.00

36 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J1 ) Uk.255x270 Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 23.7000 129,137.00 3,060,546.90
Pek. Pasangan Frame Rangka Pintu Kaca Alumunium M2 1.2000 178,893.00 214,671.60
Pek. Pasangan Kaca 5mm M2 3.7800 181,385.00 685,635.30
Pek. Memasang Engsel Jendela Bh 4.0000 60,385.00 241,540.00
Pek.Memasang Sloot Jendela Bh 2.0000 56,672.00 113,344.00
Sealent Tube 9.4800 30,000.00 284,400.00
Jumlah 4,600,137.80
Dibulatkan 4,600,100.00

37 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J2 ) Uk.190x225Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 17.1500 129,137.00 2,214,699.55
Pek. Pasangan Frame Rangka Pintu Kaca Alumunium M2 1.4300 178,893.00 255,816.99
Pek. Pasangan Kaca 5mm M2 3.5900 181,385.00 651,172.15
Pek. Memasang Engsel Jendela Bh 4.0000 60,385.00 241,540.00
Pek.Memasang Sloot Jendela Bh 2.0000 56,672.00 113,344.00
Sealent Tube 6.8600 30,000.00 205,800.00
Jumlah 3,682,372.69
Dibulatkan 3,682,300.00

38 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J3 ) Uk 115x255 Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 13.4000 129,137.00 1,730,435.80
Pek. Pasangan Frame Rangka Pintu Kaca Alumunium M2 1.0450 178,893.00 186,943.19
Pek. Pasangan Kaca 5mm M2 2.7500 181,385.00 498,808.75
Pek. Memasang Engsel Jendela Bh 4.0000 60,385.00 241,540.00
Pek.Memasang Sloot Jendela Bh 2.0000 56,672.00 113,344.00
Sealent Tube 5.3600 30,000.00 160,800.00
Jumlah 2,931,871.74
Dibulatkan 2,931,800.00

39 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( J4 ) Uk 115x255 Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 13.4000 129,137.00 1,730,435.80
Pek. Pasangan Kaca 5mm M2 2.2000 181,385.00 399,047.00
Sealent Tube 5.3600 30,000.00 160,800.00
Jumlah 2,290,282.80
Dibulatkan 2,290,200.00

40 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( V1) Uk 50x255 Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 7.8500 129,137.00 1,013,725.45
Pek. Pasangan Kaca 5mm M2 1.1000 181,385.00 199,523.50
Sealent Tube 3.1400 30,000.00 94,200.00
Jumlah 1,307,448.95
Dibulatkan 1,307,400.00

41 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( V2) Uk 50x190Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 6.0000 129,137.00 774,822.00
Pek. Pasangan Kaca 5mm M2 0.8250 181,385.00 149,642.63
Sealent Tube 2.4000 30,000.00 72,000.00
Jumlah 996,464.63
Dibulatkan 996,400.00

42 1 UNIT PEK. JENDELA ALUMUNIUM 3' ( V3) Uk 55x60Cm


Pek. Pasangan Kusen Pintu / Jendela Alumunium Profil Warna 3" M1 2.3000 129,137.00 297,015.10
Pek. Pasangan Kaca 5mm M2 0.2750 181,385.00 49,880.88
Sealent Tube 0.9200 30,000.00 27,600.00
Jumlah 374,495.98
NO. URAIAN ITEM PEKERJAAN SAT. KOEFF. HARGA SATUAN JUMLAH HARGA
(Rp.) (Rp.)

1 2 3 4 5 6 = (4) x (5)
EI - 2311 Saluran berbentuk U Tipe DS 5 (30/30)
No Uraian Satuan Koefisien Harga Satuan ( Jumlah (Rp)
1 2 4 5 6
A Tenaga Kerja
1 Pekerja Jam 0.2593 17,857.14 4,630.36
2 Tukang Jam 0.1296 21,428.57 2,777.14
3 Mandor Jam 0.1296 23,571.43 3,054.86

B Bahan
1 U-Ditch 30/30 M' 1 288,300.00 288,300.00
2 Urugan Porus M3 0.04 378,581.87 15,143.27
3 Mat. Pilihan M3 0.32 201,900.00 64,608.00
C Peralatan
1 Mobile Crane Jam 0 - -
2 Alat Bantu Ls 1 1,309.52 1,309.52
Jumlah Harga Peralatan 1,309.52
D Jumlah Harga Tenaga Kerja, Bahan dan Peralatan (A+B+C) 379,823.15
E Overhead + Profit (Contoh 15%) 56,973.47
F Harga Satuan Pekerjaan per - bh (D+E) 436,796.62
A.5.1.1.31
1 M1 PEK. PASANG PIPA GALVANIS 3"
A. TENAGA KERJA
Pekerja OH 0.0360 100,000.00 3,600.00
Tukang OH 0.0600 110,000.00 6,600.00
Kepala Tukang OH 0.0060 120,000.00 720.00
Mandor OH 0.0018 120,000.00 216.00
Jumlah Harga Tenaga Kerja 11,136.00

B. BAHAN
Pipa GALVANIS 3" Btg 1.0000 303,000.00 303,000.00
Perlengkapan + Aksesoris (35% x Harga Bahan) Ls 1.0000 90,900.00 90,900.00
Jumlah Harga Bahan 393,900.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 405,036.00
E. Keuntungan Maksimal 10% 10% 40,503.60
F. Jumlah (D + E) 445,539.60
G. Dibulatkan 445,539.00

88 1 UNIT. PASANG LAMPU SOLAR CELL 90 W ALL IN ONE


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Lampu Solar Cell 60 W Bh 1.0000 390,000.00 390,000.00
Perlengkapan + Aksesoris (35% x Harga Bahan) Ls 1.0000 117,000.00 117,000.00
Jumlah Harga Bahan 507,000.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 519,132.00
E. Keuntungan Maksimal 10% 10% 51,913.20
F. Jumlah (D + E) 571,045.20
G. Dibulatkan 571,045.00

88 1 UNIT. PASANG LAMPU SOROT 30 W PHILIPS BVP 150 LED25


A. TENAGA KERJA
Pekerja OH 0.0100 100,000.00 1,000.00
Tukang OH 0.1000 110,000.00 11,000.00
Kepala Tukang OH 0.0010 120,000.00 120.00
Mandor OH 0.0001 120,000.00 12.00
Jumlah Harga Tenaga Kerja 12,132.00

B. BAHAN
Lampu Sorot 30 W Philips BVP 150 LED25 Bh 1.0000 278,000.00 278,000.00
Perlengkapan + Aksesoris (35% x Harga Bahan) Ls 1.0000 83,400.00 83,400.00
Jumlah Harga Bahan 361,400.00

C. PERALATAN
-
-
Jumlah Harga Peralatan -
D. Jumlah (A + B + C) 373,532.00
E. Keuntungan Maksimal 10% 10% 37,353.20
F. Jumlah (D + E) 410,885.20
G. Dibulatkan 410,885.00
DAFTAR
HARGA SATUAN UPAH

NO. URAIAN KODE SAT. HARGA SATUAN


(Rp.)

1 2 3 4 5

1 Pekerja L. 01 OH 100,000.00
2 Tukang L.02 OH 110,000.00
3 Kepala Tukang L.03 OH 120,000.00
4 Mandor L.04 OH 120,000.00
5 Mekanik OH 120,000.00
6 Operator OH 120,000.00
7 Pembantu Operator OH 100,000.00
8 Juru Bor OH 120,000.00
9 Pembantu Juru Bor OH 100,000.00
10 Teknisi Khusus Pompa OH 120,000.00
11 Elektrikal OH 110,000.00
12 Supir Truk OH 120,000.00
13 Knek Truk OH 100,000.00
14 Penjaga Malam OH 110,000.00
DAFTAR
HARGA SATUAN BAHAN

HARGA SATUAN
NO. URAIAN SAT. (Rp.)

1 2 3 4

I. Bahan Agregat Kasar, Bahan Perkat dan Bahan Jadinya


1 Tanah Urugan Biasa M3 50,000.00
2 Pasir Urug M3 140,000.00
3 Pasir Pasang M3 275,000.00
4 Pasir Beton M3 375,000.00
5 Batu Pecah Mesin 1-2 M3 370,000.00
6 Batu Pecah Mesin 2-3 M3 350,000.00
7 Batu Pecah Mesin 3-5 M3 350,000.00
8 Batu Pecah Mesin 5-7 M3 350,000.00
9 Batu Pecah Mesin 7-10 M3 300,000.00
10 Batu Pecah Mesin 10-15 M3 300,000.00
11 Batu Pecah Mesin 15-20 M3 300,000.00
12 Batu Belah Pondasi M3 250,000.00
13 Krikil/ Gravel Pack M3 325,000.00
14 Semen Portland 50 kg Zak 55,650
15 Semen Warna Kg 6,000.00
16 Bata Merah Bh 1,500.00
17 Bata Ringan Hebel 7.5 cm M3 850,000.00
18 Perekat Bata Ringan Hebel Zak 150,000.00
19 Gravel 1/2 dia. 30 Cm M1 60,000.00
20 Paving Block Type Tuprave (10 x 20 Cm) T = 8 Cm M2 85,000.00
21 Kansteen Paving Block Uk. 10 x 20 x 35 Cm Bh 24,000.00
22 Air Ltr 300.00
23 Batu Andesit Polos Bakar M2 100,000.00
24 Roster Bh 25,000.00

II. Bahan Kayu Berikut Bahan jadinya


1 Kayu Balok/ Papan Kayu Albasiah M3 1,250,000
2 Kayu Papan Borneo M3 5,500,000.00
3 Kayu Balok Borneo M3 5,000,000.00
4 Kayu Balok kelas II (Kayu Lokal) M3 4,000,000.00
5 Dolken 7 – 10 Btg 35,000.00
6 Triplek T = 4 mm Lbr 80,000.00
7 Multiplek T = 9 mm Lbr 135,000.00
8 HPL taco Uk. 122x244 Cm Lbr 210,000.00

III. Bahan Keramik


1 Keramik 40 x 40 cm Corak/ Warna, Platinum M2 65,000.00
2 Keramik 30 x 30 cm Corak/ Warna Anti Slip, platinum M2 60,000.00
3 Keramik 20 x 25 cm Corak/ Warna, Set. Platinum M2 60,000.00
4 Keramik 20 x 20 cm Warna/ Corak Anti Slip, platinum M2 50,000.00

IV. Bahan Logam dan Bahan Jadinya


1 Besi Beton U 24 - U 32 rata - rata Kg 15,100.00
2 Besi Profil Ex. DN Kg 12,500.00
3 Besi Plat Macam - Macam Ukuran Kg 20,000.00
4 Besi Baja IWF Macam - Macam Ukuran Kg 14,500.00
5 Besi CNP Macam - Macam Ukuran Kg 12,500.00
6 Kawat Beton Kg 20,000.00
7 Kawat Las Listrik Kg 37,500.00
8 Kawat Duri M1 15,000.00
9 Ram Kawat Loket 1/2" x 1/2" M2 25,000.00
10 Besi Hollow 100.100.3,2 mm M1 80,000.00
11 Besi Hollow 40.60.2 mm M1 38,000.00
12 Besi Hollow 40.40.2 mm M1 32,000.00
13 Besi Hollow 50.50.1,7 mm M1 29,000.00
NO. URAIAN SAT. HARGA SATUAN
(Rp.)

1 2 3 4

14 Besi Hollow 60.60.1,7 mm M1 33,000.00


15 Besi Hollow 40.40.1,7 mm M1 26,000.00
16 Besi Hollow 20.40.1,7 mm M1 25,000.00
17 Almunium Profil Warna (Bahan Kusen) 4" Set. Alexcindo M1 125,000.00
18 Almunium Profil Natural (Bahan Kusen) 3" Set. Dacon M1 95,000.00
19 Almunium Profil Natural (Bahan Kusen) 2" Set. Alexcindo M1 90,000.00
20 Frame Kaca Alumunium Set. Alexcindo M1 30,000.00
21 Almunium Daun Pintu Natural M2 75,000.00
22 Almunium Daun Jendela Natural M2 67,500.00
23 Kunci Pintu Slinder Alfa Bh 350,000.00
24 Kunci Pintu 2 Slaag Bh 170,000.00
25 Kunci Gembok Besar Bh 125,000.00
26 Besi Dia. 6 mm U/ Gantungan M1 2,500.00
27 Slot Pintu Bh 25,000.00
28 Slot Jendela Bh 25,000.00
29 Engsel Pintu Bh 35,000.00
30 Engsel Jendela Bh 35,000.00
31 Door Closer Bh 90,000.00
32 Tarikan Pintu Bh 85,000.00
33 Rel Pintu Besi M1 250,000.00
34 Roda Pintu Pagar dia. 3" Bh 150,000.00
35 Karet Kaca M1 12,500.00
36 Sealant Silikon Tube 30,000.00
37 Kaca Polos t = 5 mm, Setara ASAHI M2 115,000.00
38 Pintu Km/ Wc PVC (Lengkap dgn Kusen) Unit 570,000.00
39 Alumunium Foil M2 15,000.00
40 Wire Mess M. 10 kg 19,587.00
Stanless T = 9 Cm Cm 10,000.00
V. Bahan Paku dan Mur Baut
1 Paku 1 s/d 3 cm Kg 25,000.00
2 Paku Biasa 4 - 7 cm Kg 20,000.00
3 Paku Biasa 8 - 12 cm Kg 20,000.00
4 Paku Khusus Bh 1,000.00
5 Baut + Mur Ø 12 mm Pj. 5 - 10 cm Bh 12,500.00
6 Baut + Mur Ø 14 mm Pj = 15 cm Bh 17,500.00
7 Baut Angkur Ø 19 mm Pj = 60 mm Bh 40,000.00
8 Spanscroef Bh 30,000.00
9 Skrup Pixer Bh 650.00
10 Paku Gypsum Kg 30,000.00

VI. Bahan Penutup Atap dan Plafond


1 Seng Galvalum t = 0,5 mm M2 120,000.00
2 Bubung Seng Galvalum M1 40,000.00
3 Kuda-Kuda Baja Ringan Zinkalum uk. 75 x 35 x 0.75 mm Reng t = M2 115,000.00
4 Genteng Metalroof Berpasir 2 x 4 (77 Cm x 80 Cm T = 0,35) M2 40,000.00
5 Bubungan Metalroof Berpasir M1 50,000.00
6 Listplank GRC Warna M1 40,000.00
7 Papan GRC Board, t = 5 mm Lbr 65,000.00
8 Papan Kayu klas 1 Lbr 125,000.00
9 List Profil Plafond Gypsum t = 10 Cm M1 15,000.00
10 List Profil Plafond Kayu 1/3 Kamper Banjar M1 12,500.00
11 Tepung Gypsum Kg 6,500.00

VII. Bahan Finishing Laburan, Pengisi dan Alatnya


1 Cat Dasar Tembok Kg 20,000.00
2 Cat Tembok Setara Vinilex Kg 95,000.00
3 Cat Dasar Besi Zincromat Kg 50,000.00
4 Cat Kayu/ Besi Setara Seiv Kg 50,000.00
5 Meni Kayu/ Besi Kg 30,000.00
6 Plamir Tembok Kg 25,000.00
7 Plamir Kayu Kg 25,000.00
NO. URAIAN SAT. HARGA SATUAN
(Rp.)

1 2 3 4

8 Impra Wood Filler Kg 45,000.00


9 Politur Jadi Kg 60,000.00
10 Minyak Cat Thiner A Ltr 25,000.00
11 Terpentin Ltr 15,000.00
12 Kwas 3" Bh 15,000.00
13 Rol Cat Bh 25,000.00
14 Ampelas Bh 10,000.00
15 Minyak Pelumas Ltr 30,000.00
16 Minyak Bekisting Ltr 20,000.00
17 Solar Ltr 11,200.00
18 Lem Fox Kg 50,000.00

VIII. Bahan Elektrikal


1 Kabel NYM 2 x 1.5 mm2 (1 Roll = 50 m1) Set. Prima M1 6,500.00
2 Kabel NYM 3 x 2.5 mm2 (1 Roll = 50 m1) Set. Prima M1 10,000.00
3 Kabel NYHF 3 x 2.5 mm2 (1 Roll = 50 m1) Set. Prima M1 12,000.00
4 Kabel NYY HY 3 x 4 Prima (1 Roll = 50 m1), Set. Prima M1 13,500.00
5 Kabel NYM HY 3 x 1.5 Prima (1 Roll = 50 m1) Set. Prima M1 9,500.00
6 Kabel NYY HY 2 x 1,5 Prima (1 Roll = 50 m1), Set. Prima M1 8,500.00
7 Stop Kontak Set. Broco Bh 30,000.00
8 Saklar Tunggal Set. Broco Bh 25,000.00
9 Saklar Double Set. Broco Bh 30,000.00
10 Saklar Triple Set. Broco Bh 35,000.00
11 Lampu SL 18 Watt Set. Phillips Bh 45,000.00
12 Lampu TL 36 Watt Setara Phillip Bh 60,000.00
13 Armatur Lampu TL 1 x 36 Watt TKO Bh 175,000.00
14 Lampu TL 2 x 36 Watt V-SHAPE Bh 350,000.00
15 Lampu TL 2 x 18 Watt RM 300 Mirror Bh 250,000.00
16 Lampu TL 2 x 18 Watt RM 300 Acrylic Bh 275,000.00
17 Lampu Down Light PLE T 20 W Bh 125,000.00
18 Lampu Jalan PJU LED 90 W Philips bh 390,000.00
19 Lampu Sorot 30 W Philips BVP 150 LED25 bh 278,000.00
20 T Dus Bh 3,500.00
21 L Bow Bh 3,000.00
22 Klem 5/8" Bh 5,000.00
23 Keni 5/8" Bh 2,000.00
24 Fitting Set. Broco Bh 7,500.00
25 Pipa PVC. ( AW ) dia 5/8", Set. Maspion (Abu-abu) M1 4,500.00
26 Conduit/ Pipa PVC dia. 20 mm (3/4") M1 5,000.00
27 Isolasi Bh 2,500.00
28 MCB 4 Ampere Set. Marleen Garleen Bh 90,000.00
29 Box MCB Set. Broco Bh 125,000.00
30 Electroda Bh 17,500.00
31 Instrumen Panel Control (Lengkap) Unit 1,250,000.00
32 Dome Camera CCTV (BOSCH VDC-250FO4-10 / SONY SSC-N11 / SAM Bh 1,500,000.00
33 Box Camera CCTV (BOSCH VBC-255 / SONY SSC-G118 / SAMSUNG SCB Bh 2,000,000.00
34 DVR 24 Channel, Standalone AS 8024 + HDD 1 x 2 Terra Unit 750,000.00
35 Monitor 32" Untuk CCTV Unit 4,500,000.00
36 Power Suply Untuk CCTV Unit 2,250,000.00

IX. Bahan Sanitari


1 Pipa PVC Set. Maspion AW dia. 1/2" Btg 35,000.00
2 Pipa PVC Set. Maspion AW dia. 3/4" Btg 45,000.00
3 Pipa PVC Set. Maspion AW dia. 1" Btg 55,000.00
4 Pipa PVC Set. Maspion AW dia. 1 1/2" Btg 80,000.00
5 Pipa PVC dia. 2" Btg 65,000.00
6 Pipa PVC dia. 3" Btg 105,000.00
7 Pipa PVC dia. 4" Btg 210,000.00
8 Pipa PVC dia. 6" Btg 635,000.00
9 Pipa Pralon PVC. (AW) Berlubang dia 4", Set. Maspion (Abu-abu) Btg 340,000.00
10 Pipa Galvanis dia. 4" Btg 1,100,000.00
11 Pipa Galvanis dia. 3" Btg 303,000.00
12 Pipa Galvanis dia. 1.1/2" Btg 185,000.00
NO. URAIAN SAT. HARGA SATUAN
(Rp.)

1 2 3 4

13 Pipa Galvanis dia. 1" Btg 150,000.00


14 Polycarbonat (twinlite t = 10mm)cARBONAT M2 143,000.00
NO. URAIAN SAT. HARGA SATUAN
(Rp.)

1 2 3 4

15 Kran Air 1/2" atau 3/4 set. Onda Bh 60,000.00


16 Kran Air Biasa 3/4 Bh 50,000.00
17 Kran Air Biasa 1" Bh 75,000.00
18 Jet Washer Bh 200,000.00
19 Floor Drain set. Toto Bh 135,000.00
20 Wastafel set. Toto Bh 2,000,000.00
21 Closet Jongkok Warna set. Toto Unit 350,000.00
22 Closet Duduk Warna set. Toto Unit 2,500,000.00
23 Solatip Pipa Pvc Bh 5,000.00
24 Lem PVC Tube 10,000.00
25 Ijuk Ikat 15,000.00
26 Buis Beton Bh 135,000.00
27 Torn Kap. 300 Ltr Set. Piguin Unit 650,000.00
28 Torn Kap. 500 Ltr Set. Piguin Unit 950,000.00
29 Torn Kap. 1000 Ltr Set. Piguin Unit 1,750,000.00
30 Mesin Pompa Jet Pump 250 watt Set. Simizu Unit 2,500,000.00
31 Mesin Pompa Submersible 1 PK Unit 4,000,000.00
32 Mesin Pompa Submersible 1,5 PK Unit 5,000,000.00
33 Exhaustfan CFM Unit 450,000.00
34 AC Wall Split 1 PK, Type FT35FV Daikin Unit 3,500,000.00
35 AC Wall Split 3/4 PK, Type FT20FV Daikin Unit 3,100,000.00
36 AC Wall Split 1,5 PK, Type R32 ex Daikin Unit 5,000,000.00
DAFTAR
HARGA SATUAN SEWA PERALATAN

HARGA SATUAN
NO. URAIAN SAT.
(Rp.)

1 2 3 4

1 Mesin Las Listrik Jam 110,000.00


2 Stemper Jam 75,000.00
3 Compressor 4000 - 6500 L/M Jam 100,000.00
4 Generator Set Jam 100,000.00
5 Vibro Roller Jam 250,000.00
6 Tandem Roller Jam 350,000.00
7 Dump Truk Jam 300,000.00
8 Truk Tronton Hari 750,000.00
9 Water Tank Truck Jam 150,000.00
10 Mesin Bor Sumur Dangkal Lengkap Daya 60 M1 Bln 12,000,000.00
11 Mesin Katrol lengkap dengan dudukan ( Jangka ) Bln 1,500,000.00
12 Alat Untuk Perakitan/ Erection Pek. Besi Profil/ Besi IWF Jam 150,000.00
13 Test Comesioning Ls 200,000.00
14 Tripod t = 5 M Hari 350,000.00
15 Alat Pancang Hamer 0,5 Ton Hari 200,000.00
16 Alat Penyambung Tiang Pancang Dolken Hari 350,000.00
17 Motor Grader Jam 327,000.00
18 Chain Saw Jam 50,000.00
19 Whel Loaeder Jam 255,000.00
20 Alat Bantu Ls 17,500.00
BESI BETON ( P = 12 m ) BESI SIKU

UKURAN JENIS BERAT/m'


UKURAN
DIAMETER kg
f 6 mm polos 0.2217 20.20.3 mm
f 8 mm polos 0.3950 25.25.3 mm
f 10 mm polos 0.6167 25.25.5 mm
f 12 mm polos 0.8917 30.30.3 mm
f 13 mm ulir 1.0417 40.40.3 mm
f 14 mm polos 1.2083 40.40.4 mm
f 16 mm polos 1.5833 40.40.5 mm
f 16 mm ulir 1.5833 45.45.4 mm
f 19 mm ulir 2.2300 45.45.5 mm
f 22 mm ulir 2.9800 50.50.4 mm
f 25 mm ulir 3.8500 50.50.5 mm
f 32 mm ulir 6.3125 50.50.6 mm
60.60.5 mm
BESI PLAT HITAM 60.60.6 mm
65.65.6 mm
BERAT/lbr 70.70.6 mm
UKURAN
kg 70.70.7 mm
1,2 X 1200 X 2400 mm 28.00 9.72 75.75.6 mm
1,4 X 1200 X 2400 mm 33.00 75.75.7 mm
1,5 X 1200 X 2400 mm 35.00 12.15 75.75.8 mm
1,8 X 1200 X 2400 mm 42.00 75.75.9 mm
1,9 X 1200 X 2400 mm 44.50 80.80.8 mm
2 X 1200 X 2400 mm 46.70 16.22 90.90.7 mm
2,3 X 1200 X 2400 mm 54.00 90.90.9 mm
2,6 X 1200 X 2400 mm 60.70 90.90.10 mm
2,8 X 1200 X 2400 mm 65.30 100.100.7 mm
2,9 X 1200 X 2400 mm 67.60 100.100.10 mm
3 X 1200 X 2400 mm 70.00 120.120.11 mm
3,2 X 1200 X 2400 mm 74.70 120.120.12 mm
4 X 1200 X 2400 mm 93.30 125.125.12 mm
4,5 X 1200 X 2400 mm 105.00 130.130.9 mm
5 X 1200 X 2400 mm 117.00 130.130.12 mm
6 X 1200 X 2400 mm 140.00 150.150.10 mm
8 X 1200 X 2400 mm 187.00 150.150.12 mm
9 X 1200 X 2400 mm 210.00 150.150.15 mm
10 X 1200 X 2400 mm 233.00 80.90 200.200.15 mm
12 X 1200 X 2400 mm 280.00 97.22 200.200.20 mm
13 X 1200 X 2400 mm 303.00 200.200.25 mm
15 X 1200 X 2400 mm 350.00 250.250.25 mm
16 X 1200 X 2400 mm 373.00 129.51
18 X 1200 X 2400 mm 420.00 BESI KANAL "C"
19 X 1200 X 2400 mm 443.00
20 X 1200 X 2400 mm 467.00
UKURAN
21 X 1200 X 2400 mm 490.00
22 X 1200 X 2400 mm 513.00 60.30.10.1,2
25 X 1200 X 2400 mm 583.00 60.30.10.2,3
28 X 1200 X 2400 mm 653.00 75.35.10.1,6
30 X 1200 X 2400 mm 700.00 75.45.15.2,3
32 X 1200 X 2400 mm 747.00 100.50.20.2,3
38 X 1200 X 2400 mm 887.00 100.50.20.3,2
42 X 1200 X 2400 mm 980.00 125.50.20.2,3
45 X 1200 X 2400 mm 1,050.00 125.50.20.3,2
50 X 1200 X 2400 mm 1,167.00 150.50.20.2,3
65 X 1200 X 2400 mm 1,516.00 150.50.20.3,2
75 X 1200 X 2400 mm 1,750.00 150.65.20.2,3
85 X 1200 X 2400 mm 1,983.00 150.65.20.3,2
100 X 1200 X 2400 mm 2,333.00 200.75.20.3,2

BESI KANAL UNP BESI KANAL IWF

BERAT/6m
UKURAN UKURAN
kg
50.36.5 mm 33.50 5.583333 WF 100X50X5X7
65.42.5,5 mm 42.50 WF125X60X6X8
75.40.5 mm 41.50 WF 150X75X5X7
80.45.5 mm 47.00 WF 175X90X5X8
100.50.5 mm 56.20 WF 200X100X3,2X4,5
120.55.6 mm 75.00 WF 200X100X5,8X8
125.55.6 mm 80.40 WF 250X125X6X9
140.60.7 mm 96.00 WF 300X150X6,5X9
150.75.6,5 mm 112.00 WF 350X175X7X11
160.66.7 mm 115.50
180.75.7 mm 132.00
200.80.7,5 mm 152.00
220.80.9 mm 187.50
240.85.9,5 mm 205.00
250.80.7,1 mm 182.50
250.90.9 mm 208.00
260.90.10 mm 114.00
300.90.9 mm 229.00
300.100.10 mm 278.00
380.100.10,5 mm 337.50
PIPA PERSEGI
BERAT/6m
UKURAN ( mm ) TEBAL ( mm )
kg
12,5 X 12,5 0.90 0.3320
15 X 15 0.90 0.4030
20 X 20 0.90 0.5440
25 X 25 1.00 0.7590
30 X 30 1.00 0.9150
40 X 40 1.20 1.4680
10 X 20 0.90 0.4030
12,5 X 27,5 0.90 0.5440
15 X 30 0.90 0.6150
20 X 40 1.00 0.9150
25 X 50 1.40 1.5970
20 X 60 1.40 1.9260
BESI SIKU

BERAT/6m M1/kg
kg
5.31 0.89
6.72 1.12
10.60 1.77
8.16 1.36
11.00 1.83
14.50 2.42
18.00 3.00
16.44 2.74
20.50 3.42
18.40 3.07
22.50 3.75
27.58 4.60
27.30 4.55
32.52 5.42
35.46 5.91
38.28 6.38
44.28 7.38
41.22 6.87
45.00 7.50 1x 16.2152777778
54.18 9.03 2.88 46.70
59.80 9.97
57.96 9.66
57.54 9.59
73.20 12.20
79.80 13.30
64.25 10.71
90.60 15.10
119.40 19.90
130.00 21.67
140.00 23.33
107.10 17.85
140.10 23.35
140.00 23.33
164.00 27.33
202.00 33.67
272.00 45.33
358.00 59.67
442.00 73.67
562.00 93.67

SI KANAL "C"
BERAT/6m
kg
7.44 1.24

13.90
19.50 3.25
24.40
33.00 5.50
27.10
36.80 6.13
30.00
40.60
33.00
45.10
56.00

SI KANAL IWF

BERAT/M1
kg
9.33
13.20
14.00 1,600,000
18.10 133,333.33
11.91 9523.80952381
21.33
29.60
36.70
49.60
A PEKERJAAN PERSIAPAN
Pek. Mobilisasi Dan Demobilisasi
Pek. Administrasi, Pelaporan dan Foto Dokumentasi
Pek. Papan nama Proyek
Pek. Biaya Keselamatan Kerja (K3)
Pek. Pembersihan Lokasi
Pek. Bouwplank
B BANGUNAN GUDANG
PEKERJAAN TANAH DAN PONDASI ( GUDANG )
Pek. Galian Tanah Biasa Kedalaman 1M (batu kali)
Pek. Rucuk Bambu
Pek. Urugan Tanah Peninggian Lantai
Pek. Urugan Tanah Kembali
Pek. Urugan Pasir Bawah Pondasi
Pek. Batu Kosongan (Aanstamping)
Pek Pasangan Pondasi Batu Kali ad. 1Pc : 4Ps

Pek.Lantai Kerja Bawah Pondasi Telapak


Pek. Urugan Pasir Bawah Pondasi Telapak
Pek. Pondasi Telapak Uk. 0.9 x 0.9 x 25Cm

PEKERJAAN BETON STRUKTUR (GUDANG)


Pek. Sloof 20/30 Beton Bertulang K.225
Pek. Kolom Pedestal 15/30 Beton Bertulang K.225
Pek. Kolom Utama 15/25 Beton Bertulang K.225
Pek. Kolom IWF 200.100.3.2 .4.5
Pek. Balok IWF 100.75.5.7 mm
Pek. Ring Balok 15/25 Beton Bertulang K.225
Pek. Ring Balok Tengah Dinding 15/20 Beton Bertulang K.225
Pek. Balok Lintel 12/12 Beton Bertulang K.225
Pek. Kolom 15/20 Beton Bertulang K.225
Pek. Meja Beton Bertulang K.225
Pek. Stek Besi Dia 6 mm Pada Kolom IWF
Pek. Base Plat, T = 10 mm
Pas. Baut Angkur Ø 19 mm Pj.60 cm
Pek. Topian Beton Bertulang K.175, 10 Cm
PEKERJAAN PASANGAN DINDING
Pek. Pasangan Trasram Dinding Bata Merah ad 1 : 3
Pek. Pasangan Dinding Bata Merah ad 1 : 5
Pek. Pasangan Trasram Dinding Bata Merah ad 1 : 3 (bak)
Pengurangan
Bovenlight
Jendela
Pintu Darurat
Pintu Sorong besi

Total Pasangan bata


Pek. Plesteran Dinding Bata ad 1 : 3 T = 15 mm
Pek. Plesteran Dinding Bata ad 1 : 5 T = 15 mm
Pek. Acian

PEKERJAAN LANTAI
Pek. Urugan Pasir Urug Bawah Lantai Beton, T = 10 cm
Pek. Meja beton, T = 12 cm
Pek. Lantai keramik Uk40x40 Cm
Wiremash
Pek. Lantai Beton, T = 12 cm Dalam Ruangan
Pek. Lantai Rabat Beton Keliling bangunan Gudang, T = 10 cm
Pek. Lantai Beton, T = 12 cm Luar Ruangan
Pek. Urugan Tanah Di datangkan Dari Luar
Pek. Pemadatan Tanah
Pek. Lapisan Pondasi bawah Onderlagh Di Padatkan
Pek. Lapisan Pondasi A Di Padatkan
Pek. Paving Blok Natural T = 8 Cm
Pek. Kansteen
Pek. Acian Lantai Beton, T = 12 cm Dalam Ruangan
Pek. Lantai Beton, T = 12 cm (Ramp masuk)
PEKERJAAN STRUKTUR ATAP
Pek. Pasang Rangka Baja Ringan (Zinkalum uk.75 x 35 x 0,75 mm, Reng T = 0,45 mm)
Pek. Penutup Atap Genteng Metal Berpasir
Pek. Pasangan Bubungan Genteng Metal
Pek. Pasangan Lisplank GRC
Pek. Saluran Grevel 1/2 Dia 25 Cm + Pasangan Bata Merah
PEKERJAAN PASANGAN RANGKA PENUTUP PLAFOUND
Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4
Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4 luar
TotalPas Rangka Plafond
Pek. Pasangan Gypsum Board T = 9mm
Pek. Pasangan Grc T = 5mm
Pek. Pasangan List Profil Gypsum
Pek. Pasangan List Profil Gypsum Luar
Total list Propil

PEKERJAAN PINTU DAN JENDELA


Pek. Pasang Pintu Alumunium (P1)
Pek. Pasang Pintu Besi
Pek.Bovenlight
Pek.Kusen Jendela alumunium J2
PEKERJAAN PENGECATAN
Pek. Pengecatan Dinding Set. Vinilek
Pek. Pengecatan Plafound Set. Vinilek
Pek. Pengecatan Listplank Set. Seive

C BANGUNAN LABORATORIUM

PEKERJAAN TANAH DAN PONDASI (LABORATORIUM )


Pek. Galian Tanah Biasa Kedalaman 1M (batu kali)
Pek. Rucuk Bambu
Pek. Urugan Tanah Peninggian Lantai
Pek. Urugan Tanah Kembali
Pek. Urugan Pasir Bawah Pondasi
Pek. Batu Kosongan (Aanstamping)
Pek Pasangan Pondasi Batu Kali ad. 1Pc : 4Ps
Galian Tanah pondasi
Pek.Lantai Kerja Bawah Pondasi Telapak
Pek. Urugan Pasir Bawah Pondasi Telapak
Pek. Pondasi Telapak Uk. 0.9 x 0.9 x 25Cm

PEKERJAAN BETON STRUKTUR (LABORATORIUM)


Pek. Sloof 20/30 Beton Bertulang K.225
Pek. Kolom Pedestal 15/30 Beton Bertulang K.225
Pek. Kolom Utama 15/30 Beton Bertulang K.225
Pek. Kolom IWF 200.100.3.2 mm
Pek. Balok IWF 100.75.5.7 mm
Pek. Stek Besi Dia 6 mm Pada Kolom IWF
Pek. Base Plat, T = 10 mm
Pas. Baut Angkur Ø 19 mm Pj.60 cm
Pek. Ring Balok 15/30 Beton Bertulang K.225
Pek. Ring Balok Tengah Dinding 15/30 Beton Bertulang K.225
Pek. Balok Lintel 10/10 Beton Bertulang K.225
Pek. Kolom Praktis 15/20 Beton Bertulang K.225
Pek. Meja Beton Bertulang K.225
Pek. Lantai keramik Uk40x40 Cm (Meja Beton)
Pek. Kolom Praktis 15/15 Beton Bertulang K.225 ( Meja Beton)
Pek. Balok 10/15 Beton Bertulang K.225 (Meja Beton)
Topian Beton
PEKERJAAN PASANGAN DINDING
Pek. Pasangan Trasram Dinding Bata Merah ad 1 : 3
Pek. Pasangan Dinding Bata Merah ad 1 : 5
Pek. Pasangan Trasram Dinding Bata Merah ad 1 : 3 (bak)
Pengurangan
Bovenlight
Jendela 1
Jendela 2
Pintu Doble
Pintu Tunggal

Total Pasangan bata


Pek. Plesteran Dinding Bata ad 1 : 3 T = 15 mm
Pek. Plesteran Dinding Bata ad 1 : 5 T = 15 mm
Pek. Acian

PEKERJAAN LANTAI
Pek. Urugan Pasir Urug Bawah Lantai Beton, T = 10 cm
Pek. Lantai Beton, T = 12 cm
Pek Wire Mash
Pek. Lantai Rabat Beton Keliling bangunan Gudang, T = 10 cm
Pek. Lantai keramik Uk40x40 Cm
Pek. Lantai keramik Uk40x40 Cm Teras

Pek. Urugan Pasir Urug Bawah Lantai Keramik, T = 10 cm

Acian Beton

Total Acian beton


Pek. Saluran Grevel 1/2 Dia 25 Cm + Pasangan Bata Merah
PEKERJAAN STRUKTUR ATAP
Pek. Pasang Rangka Baja Ringan (Zinkalum uk.75 x 35 x 0,75 mm, Reng T = 0,45 mm)
Pek. Penutup Atap Genteng Metal Berpasir
Pek. Pasangan Bubungan Genteng Metal
Pek. Pasangan Seng BJLS
Pek. Pasangan Lisplank GRC
PEKERJAAN PASANGAN RANGKA PENUTUP PLAFOUND
Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4
Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4 luar
TotalPas Rangka Plafond
Pek. Pasangan Gypsum Board T = 9mm
Pek. Pasangan Grc T = 5mm
Pek. Pasangan List Profil Gypsum
Pek. Pasangan List Profil Gypsum Luar
Total list Propil

PEKERJAAN PINTU DAN JENDELA


Pek. Pasang Pintu Alumunium (P1)
Pek. Pasang Pintu Besi
Pek.Bovenlight
Pek.Kusen Jendela alumunium J2

PEKERJAAN PENGECATAN
Pek. Pengecatan Dinding Set. Vinilek
Pek. Pengecatan Plafound Set. Vinilek
Pek. Pengecatan Listplank Set. Seive

Pek. Toilet 1
Pek. Galian Tanah Pondasi
Pek. Urugan Pasir Bawah Pondasi T = 5 - 10 cm
Pek. Aanstamping Batu Kali
Pek. Pasangan Batu Kali ad. 1Pc : 4Ps
Pek. Sloof 20/30 Beton Bertulang K.225
Pek. Kolom 15/20 Beton Bertulang K.225
Pek. Ring balk Balok 15/20 cm Beton Bertulang Beton Site Mix K.225
Pek. Plat Lantai T = 12 Cm
Pek. Dinding Bata Merah Trasraam ad. 1Pc : 2Ps, T = 50 cm
Pek. Dinding Bata Merah ad. 1Pc : 4Ps
Pek. Plesteran Dinding Trasraam ad. 1Pc : 2Ps
Pek. Plesteran Dinding ad. 1Pc : 4Ps
Pek. Acian
Pek. Urugan Pasir Bawah Lantai Keramik T = 5 cm
Pek. Lantai keramik Uk. 20x20 Cm
Pek.Dinding Keramik Uk. 20x40 Cm
Pek.Closet Duduk
Wastafelel
Pintu PVC
Pek. Pasangan Pipa Air Kotor PVC 4" Set. Maspion
Pek. Pasangan Pipa Air Kotor PVC 3" Set. Maspion
Pek. Pasangan Pipa Air Bersih PVC 1" Set. Maspion
Pek. Pasangan Pipa Air Bersih PVC 1/2" Set. Maspion
Pek. Pasangan Floordrain
Pek. Pasangan Kran 1/2" Set. Onda
Pek. Pasangan Washtafel Set. Toto
Pek. Pasang Kloset Duduk Set. Toto
Pek. Pintu PVC Kamar Mandi
Pek. Pasangan Jetwasher
Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4
Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4 luar
TotalPas Rangka Plafond
Pek. Pasangan Grc T = 5mm
Pek. Pasangan List Profil Gypsum
PEKERJAAN PENGECATAN
Pek. Pengecatan Dinding Set. Vinilek
Pek. Pengecatan Plafound Set. Vinilek
Pek. Pengecatan Listplank Set. Seive

Pek. Toilet 2
Pek. Galian Tanah Pondasi
Pek. Urugan Pasir Bawah Pondasi T = 5 - 10 cm
Pek. Aanstamping Batu Kali
Pek. Pasangan Batu Kali ad. 1Pc : 4Ps
Pek. Sloof 15/20Beton Bertulang K.225
Pek. Kolom 15/15 Beton Bertulang K.225
Pek. Ring balk Balok 15/20 cm Beton Bertulang Beton Site Mix K.225
Pek. Dinding Bata Merah Trasraam ad. 1Pc : 2Ps, T = 50 cm
Pek. Dinding Bata Merah ad. 1Pc : 4Ps
Pek. Plesteran Dinding Trasraam ad. 1Pc : 2Ps
Pek. Plesteran Dinding ad. 1Pc : 4Ps
Pek. Acian
Pek. Urugan Pasir Bawah Lantai Keramik T = 5 cm
Pek. Lantai keramik Uk. 20x20 Cm
Pek.Dinding Keramik Uk. 20x40 Cm
Pek.Closet Duduk
Wastafelel
Pintu PVC
Pek. Pasangan Pipa Air Kotor PVC 4" Set. Maspion
Pek. Pasangan Pipa Air Kotor PVC 3" Set. Maspion
Pek. Pasangan Pipa Air Bersih PVC 1" Set. Maspion
Pek. Pasangan Pipa Air Bersih PVC 1/2" Set. Maspion
Pek. Pasangan Floordrain
Pek. Pasangan Kran 1/2" Set. Onda
Pek. Pasangan Washtafel Set. Toto
Pek. Pasang Kloset Duduk Set. Toto
Pek. Pintu PVC Kamar Mandi
Pek. Pasangan Jetwasher
Pek. Pasang Rangka Baja Ringan (Zinkalum uk.75 x 35 x 0,75 mm, Reng T = 0,45 mm)
Pek. Penutup Atap Genteng Metal Berpasir
Pek. Pasangan Bubungan Genteng Metal

Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4


Pek. Pasangan Rangka Plafound Hollow 2x4, 4x4 luar
TotalPas Rangka Plafond
Pek. Pasangan Grc T = 5mm
Pek. Pasangan List Profil Gypsum
PEKERJAAN PENGECATAN
Pek. Pengecatan Dinding Set. Vinilek
Pek. Pengecatan Plafound Set. Vinilek
Pek. Pengecatan Listplank Set. Seive

PEKERJAAN BENTENG PAGAR


Pek. Pasangan Bouwplank
Pek. Galian Tanah Pondasi
Pek. Urugan Pasir Bawah Pondasi T = 5 - 10 cm
Pek. Pasangan Aanstamping/ Batu Kosong Batu Kali
Pek. Pasangan Batu Kali ad. 1Pc : 4Ps
Pek. Lantai Kerja Bawah Pondasi Beton Site Mix K.100, T = 5 cm
Pek. Pondasi Telapak uk. 60x60x20 cm Beton Bertulang Beton Site Mix K.175 (PS.2)
Pek. Kolom Pedestal 30/30 cm Beton Bertulang Beton Site Mix K.175 (KPDL.2)
Pek. Sloof 15/20 cm Beton Bertulang Beton Site Mix K.175 (S.2)
Pek. Kolom Praktis 15/15 cm Beton Bertulang Beton Site Mix K.175 (KP.2)
Pek. Ring Balk 15/15 cm Beton Bertulang Beton Site Mix K.175 (RB.1)
Pek. Dinding Bata Merah Cmp. 1Pc : 4Ps
Pek. Plesteran Dinding Camp. 1Pc : 2Ps
Pek. Plesteran Kolom

Pek. Acian
Pek. Pintu Pagar Besi Hollow ( Uk. 2 x 2 M)
Pek. Pengecatan Dinding Pagar Cat Eksterior set. Vinilex
Pagar Hollow
1 M2 PAGAR RANGKA HOLLOW
Pekerjaan Besi Hollow Uk. 4x4 Cm T = 1.2 MM
Pekerjaan Besi Hollow Uk. 2x4 Cm T = 1.2 MM
Pek. Pengelasan
Pek. Pengecatan Besi

PEKERJAAN GAZEBO
Pek. Pasangan Bouwplank
Pek. Galian Tanah Pondasi
Pek. Urugan Pasir Bawah Pondasi T = 5 - 10 cm
Pek. Beton Tumbuk
Pek. Meja beton
Pek. Pasangan Keramik Uk.40x40 Cm
Pek.Kolom Pipa Giv Dia 4'
Pek.Kolom Pipa Giv Dia 3'
Pek.Kolom Pipa Giv Dia 2'
Pek. Rangka Atap Kuda-Kuda Baja Ringan Zinkalum uk. 75 x 35 x 0.75 mm Reng t = 0,45 mm
Pek. Penutup Atap Genteng Metalroof Berpasir 2 x 4 (77 Cm x 80 Cm T = 0,35)
Pek. Pengecatan Besi Set. Seive

PEKERJAAN KOLAM DAN CANOPY


Pek. Galian Tanah U/ Pondasi Batu Kali Kolam
Pek. Urugan Pasir Bawah Pondasi, T = 5 cm
Pek. Pasang Aanstaamping Batu Kali
Pek. Pasang Batu Kali ad. 1Pc : 4Ps
Pek. Kanopi Rangka Besi Pipa Giv + Atap Penutup Genteng Metal Berpasir

1 UNIT PEKERJAAN TOWER + TORN KAPASITAS 1M3


Pek. Galian Tanah Pondasi
Pek. Urugan Pasir Urug, T = 5 cm
Pek. Lantai Kerja Bawah Pondasi Telapak Beton Tumbuk Site Mix K. 100, T = 5 Cm
Pek. Pondasi Telapak Uk. 40x40x20 cm Beton Bertulang Beton Site Mix K.175
Pek. Kolom Pedestal 20/20 cm Beton Bertulang Beton Site Mix K.175
Pek. Base Plat T = 5 mm uk. 15 x 15 cm
Pek. Pasang Angkur Dia. 14 mm Pj. 15 cm
Pek. Besi Siku L. 50.50.5 mm
Pek. Besi Siku L. 30.30.5 mm
Pek. Plat Besi Lantai Torn T = 1,2 mm
Pek. Pengelasan
Pek. Pengecatan Bidang Besi dgn Cat Besi set. Seiv
Pek. Pasang Torn Kap. 1000 Ltr
Pek. Pasang Pipa Instalasi/ Distribusi PVC 3/4"
Alat bantu

Papan Nama
11.75
20.2
30.1
38.8
27.5
11.9
20.2
38.8
27.5
8.6
31.8
38.6
11.9
20.2
22.6
20.2
31.3
411.95
GUDANG
P L T JML VOL

34 0.6 1.1 22.44


3 4 6 72

34 0.6 0.1 2.04


34 0.6 0.25 5.1
34 0.45 0.75 11.475

1 1 0.05 6 0.3
1 1 0.1 6 0.6
0.8 0.8 0.25 6 0.96

51 0.2 0.3 3.06


0.15 0.25 1.5 6 0.3375
0.15 0.25 5 6 1.125
6 5 30 357.3 kg
51 475.983 kg
51 0.15 0.2 1.53
34 0.15 0.2 1.02
30.5 0.1 0.1 0.305
0.15 0.2 5 7 1.05
7 1 0.12 0.84
18 0.2 6 21.6 4.788 kg
0.25 0.25 6 0.375 4.557292 kg
4 6 24
27 0.5 0.1 1.35

34 0.5 1.95 15.05


34 4.6 18 140.35
4 0.8 3.2

0.75 0.5 20 7.5


0.5 2.5 6 7.5
2.5 0.9 2.25
2.5 0.3 0.75
18

36.5
280.7
317.2

9.85 6.85 0.1 6.74725


6.15 0.8 0.12 0.5904
1.6 6.15 9.84
9.85 6.85 67.4725 13.56667 915.3769 Kg
9.85 6.85 0.12 8.0967
28 0.8 0.1 2.24
6.15 13.45 0.15 12.40763 82.7175
6.15 13.45 0.75 62.03813
6.15 13.45 82.7175
6.15 13.45 0.3 24.81525
6.15 13.45 0.1 8.27175
6.15 13.45 82.7175
33.05 33.05
9.85 6.85 0.12 8.0967
3 1.4 0.12 0.504

12 9 120% 129.6
129.6
28.44 28.44
42 42
36.5 36.5

9.85 6.85 67.4725


38 0.8 30.4
97.8725
67.4725
30.4
33.4 33.4
38
71.4

3.1 0.85 1
2.75 3 1
0.65 0.6 29
317.2
97.8725
42

98 0.6 1.1 64.68


3 4 10 120

98 0.6 0.1 5.88


98 0.6 0.25 14.7
98 0.45 0.75 33.075
0.8 0.8 0.05 10 0.32
0.8 0.8 0.05 10 0.32
0.8 0.8 0.1 10 0.64
0.8 0.8 0.25 10 1.6

98 0.2 0.3 5.88


0.15 0.25 1.5 10 0.5625
0.15 0.3 5 10 2.25
5 10 50 595.5 Kg
98 98 914.634 Kg
18 0.2 10 2.216667 Kg
0.25 0.25 10 0.625 7.595486 Kg

98 0.15 0.25 3.675


68 0.15 0.2 2.04
68 0.12 0.12 0.9792
0.15 0.2 5 18 2.7
18 0.8 0.12 1.728
18 1.6 28.8
0.15 0.15 0.9 23 0.46575
32 0.1 0.15 0.48
51 0.5 0.1 2.55

78 0.5 2.55 36.45


78 4.6 11.22 347.58
1.5 0.5 0.75
2 0.1 13 2.6
2.7 1.9 6 30.78
2.7 1.7 3 13.77
2.7 0.9

74.4
695.16
769.56

16.35 9.85 0.1 16.10475


16.35 9.85 0.12 19.3257
16.35 9.85 2184.878 161.0475 22 13.56667
33.32 17.135 0.1 5.0455
9.85 7.35 72.3975
5.1 2.55 1.32 14.325
86.7225
8.67225

16.35 9.85 161.0475


33.32
17.135
211.5025
77.5 77.5

312 12.2 120% 389.04


389.04
58.6 58.6
4.3 2 8.6
80 80

23.7 9.85 233.445


57.6 13.0425 70.6425
304.0875
233.445
70.6425
137.9 137.9
77.5 77.5
215.4
769.56
304.0875
32

7.6 0.6 1.1 5.016


7.6 0.5 0.1 0.38
7.6 0.6 0.25 1.14
7.6 0.45 0.75 2.565
7.6 0.2 0.3 0.456
0.15 0.2 3.5 13 1.365
12 0.15 0.2 0.36
7 3 0.12 2.52
7.6 0.5 3.8
7.6 3 22.8
7.6
45.6
53.2
7 3 0.1 2.1
7 3 21
6.41 1.5 2 2.8 16.43
2
1
2

12.82 17.34 30.16

7.6
10.5 0.6 1.1 6.93
10.5 0.5 0.1 0.525
10.5 0.6 0.25 1.575
10.5 0.45 0.75 3.54375
10.5 0.15 0.2 0.315
0.15 0.15 3.5 6 0.4725
10.5 0.15 0.2 0.315
10.5 0.5 5.25
10.5 3 31.5
10.5 3 7.5
63 6 57
73.5 64.5
4.5 0.1 0.45
4.5 4.5
6 1.5 2 2.8 15.2
2

3.5 3 120% 12.6


12.6
3

3 1.5 4.5
13 0.8 10.4
14.9
14.9
12

64.5
4.5
9.5

32.65 0.6 1.1 21.549


32.65 0.6 0.1 1.959
32.65 0.6 0.25 4.8975
32.65 0.45 0.6 8.8155

32.65 0.15 0.2 0.9795


0.15 0.15 2 10.88333 0.48975

32.65 0.8 26.12


52.24
0.6 1.2 11 7.92
60.16
1

2.6 0.04 0.104


9 0.02 0.36
0.464 100 46.4
2.6 0.16 2.6
9 0.12 1.08
3.68

18
0.3 0.3 0.5 4 0.18
0.3 0.3 0.05 4 0.018
0.3 0.3 0.45 4 0.162
7.8 0.4 0.12 2 0.7488
7.8 0.8 2 12.48
4 3 12
18 18
15 12 180
7 6 120% 50.4

3.14 0.1 12 3.768


115.8 0.6 1.1 76.428
115.8 0.6 0.1 6.948
115.8 0.6 0.25 17.37
115.8 0.45 0.75 39.0825

0.4 0.4 0.85 4 0.544


0.4 0.4 0.1 4 0.064
0.4 0.4 0.05 4 0.032
0.4 0.4 0.2 4 0.128
0.2 0.2 0.6 4 0.096
0.15 0.15 4 0.09 0.875
16
16.2 2 32.4 121.50 Kg
6.4 4 25.6 34.82 Kg
1.2 1.2 1.44 17.5 Kg
PROGRAM TERBILANG
OLEH FLAGIAT : HERIADY
CV. HAMTAR USAHA

Masukkan nilai ang


Bilangan 335,980,431.00
dimaksud (akan
Trilyun diterjemahkan dala
Ratus Milyar
Puluhan Milyar
Ratus Juta
Puluhan Juta
- Rupiah - Sen Ratus Ribu
1 Satu 10.00 Sepuluh 0.01 Satu Puluhan Ribu
2 Dua 20.00 Dua Puluh 0.01 Satu Ratusan
3 Tiga 30.00 Tiga Puluh 0.01 Satu Puluhan
4 Empat 40.00 Empat Pulu 0.01 Satu Rupiah
5 Lima 50.00 Lima Puluh 0.01 Satu Sen
6 Enam 60.00 Enam Pulu 0.02 Dua
7 Tujuh 70.00 Tujuh Pulu 0.02 Dua
8 Delapan 80.00 Delapan Pu 0.02 Dua Cek Bilangan
9 Sembilan 90.00 Sembilan P 0.02 Dua Terbilang:
10 Sepuluh 100.00 Seratus 0.02 Dua Tiga Ratus Tiga Puluh
Hasil Lima
(akan Jutaotomatis).
keluar Sembilan
11 Sebelas 200.00 Dua Ratus 0.02 Dua
12 Dua Belas 300.00 Tiga Ratus 0.02 Dua
13 Tiga Belas 400.00 Empat Ratu 0.02 Dua Note: Don't change any thing without
confirmation. It could be dangerous !!!
14 Empat Bela 500.00 Lima Ratus 0.02 Dua
15 Lima Belas 600.00 Enam Ratu 0.02 Dua How to Use1. Hubungkan cell yang akan diterje
16 Enam Bela 700.00 Tujuh Ratu 0.03 Tiga 2. Hubungkan hasil di "cell F14" ke
17 Tujuh Bela 800.00 Delapan Ra 0.03 Tiga 3. Have a nice season
18 Delapan Be 900.00 Sembilan R 0.03 Tiga
19 Sembilan B 1,000.00 Seribu 0.03 Tiga
20 Dua Puluh 2,000.00 Dua Ribu 0.03 Tiga
21 Dua Puluh 3,000.00 Tiga Ribu 0.03 Tiga
22 Dua Puluh 4,000.00 Empat Ribu 0.03 Tiga
23 Dua Puluh 5,000.00 Lima Ribu 0.03 Tiga
24 Dua Puluh 6,000.00 Enam Ribu 0.03 Tiga
25 Dua Puluh 7,000.00 Tujuh Ribu 0.03 Tiga
26 Dua Puluh 8,000.00 Delapan Ri 0.04 Empat
27 Dua Puluh 9,000.00 Sembilan R 0.04 Empat
28 Dua Puluh ### Sepuluh Ri 0.04 Empat
29 Dua Puluh ### Sebelas Ri 0.04 Empat
30 Tiga Puluh ### Dua Belas 0.04 Empat
31 Tiga Puluh ### Tiga Belas 0.04 Empat
32 Tiga Puluh ### Empat Bela 0.04 Empat
33 Tiga Puluh ### Lima Belas 0.04 Empat
34 Tiga Puluh ### Enam Belas 0.04 Empat
35 Tiga Puluh ### Tujuh Belas 0.04 Empat
36 Tiga Puluh ### Delapan Be 0.05 Lima
37 Tiga Puluh ### Sembilan B 0.05 Lima
38 Tiga Puluh ### Dua Puluh 0.05 Lima
39 Tiga Puluh ### Dua Puluh 0.05 Lima
40 Empat Pul ### Dua Puluh 0.05 Lima
41 Empat Pulu ### Dua Puluh 0.05 Lima
42 Empat Pul ### Dua Puluh 0.05 Lima
43 Empat Pulu ### Dua Puluh 0.05 Lima
44 Empat Pul ### Dua Puluh 0.05 Lima
45 Empat Pulu ### Dua Puluh 0.05 Lima
46 Empat Pul ### Dua Puluh 0.06 Enam
47 Empat Pulu ### Dua Puluh 0.06 Enam
48 Empat Pulu ### Tiga Puluh 0.06 Enam
49 Empat Pulu ### Tiga Puluh 0.06 Enam
50 Lima Puluh ### Tiga Puluh 0.06 Enam
51 Lima Puluh ### Tiga Puluh 0.06 Enam
52 Lima Puluh ### Tiga Puluh 0.06 Enam
53 Lima Puluh ### Tiga Puluh 0.06 Enam
54 Lima Puluh ### Tiga Puluh 0.06 Enam
55 Lima Puluh ### Tiga Puluh 0.06 Enam
56 Lima Pulu ### Tiga Puluh 0.07 Tujuh
57 Lima Puluh ### Tiga Puluh 0.07 Tujuh
58 Lima Puluh ### Empat Pulu 0.07 Tujuh
59 Lima Puluh ### Empat Pulu 0.07 Tujuh
60 Enam Pulu ### Empat Pulu 0.07 Tujuh
61 Enam Pulu ### Empat Pulu 0.07 Tujuh
62 Enam Pulu ### Empat Pulu 0.07 Tujuh
63 Enam Puluh ### Empat Pulu 0.07 Tujuh
64 Enam Pulu ### Empat Pulu 0.07 Tujuh
65 Enam Pulu ### Empat Pulu 0.07 Tujuh
66 Enam Pulu ### Empat Pulu 0.08 Delapan
67 Enam Puluh ### Empat Pulu 0.08 Delapan
68 Enam Pulu ### Lima Puluh 0.08 Delapan
69 Enam Pulu ### Lima Puluh 0.08 Delapan
70 Tujuh Pulu ### Lima Puluh 0.08 Delapan
71 Tujuh Pulu ### Lima Puluh 0.08 Delapan
72 Tujuh Pulu ### Lima Puluh 0.08 Delapan
73 Tujuh Pulu ### Lima Puluh 0.08 Delapan
74 Tujuh Pulu ### Lima Puluh 0.08 Delapan
75 Tujuh Pulu ### Lima Puluh 0.08 Delapan
76 Tujuh Pulu ### Lima Puluh 0.09 Sembilan
77 Tujuh Pulu ### Lima Puluh 0.09 Sembilan
78 Tujuh Pulu ### Enam Puluh 0.09 Sembilan
79 Tujuh Pulu ### Enam Puluh 0.09 Sembilan
80 Delapan Pu ### Enam Puluh 0.09 Sembilan
81 Delapan Pu ### Enam Puluh 0.09 Sembilan
82 Delapan Pu ### Enam Puluh 0.09 Sembilan
83 Delapan Pu ### Enam Puluh 0.09 Sembilan
84 Delapan Pu ### Enam Pulu 0.09 Sembilan
85 Delapan Pu ### Enam Puluh 0.09 Sembilan
86 Delapan P ### Enam Puluh 0.10 Sepuluh
87 Delapan Pu ### Enam Puluh 0.10 Sepuluh
88 Delapan Pu ### Tujuh Pulu 0.10 Sepuluh
89 Delapan Pu ### Tujuh Pulu 0.10 Sepuluh
90 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
91 Sembilan P ### Tujuh Puluh 0.10 Sepuluh
92 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
93 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
94 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
95 Sembilan P ### Tujuh Pulu 0.10 Sepuluh
96 Sembilan ### Tujuh Pulu 0.11 Sebelas
97 Sembilan P ### Tujuh Pulu 0.11 Sebelas
98 Sembilan P ### Delapan Pu 0.11 Sebelas
99 Sembilan P ### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.11 Sebelas
### Delapan Pu 0.12 Dua Belas
### Delapan Pu 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.12 Dua Belas
### Sembilan P 0.13 Tiga Belas
### Sembilan P 0.13 Tiga Belas
### Seratus 0.13 Tiga Belas
### Dua Ratus 0.13 Tiga Belas
### Tiga Ratus 0.13 Tiga Belas
### Empat Ratu 0.13 Tiga Belas
### Lima Ratus 0.13 Tiga Belas
### Enam Ratu 0.13 Tiga Belas
### Tujuh Ratu 0.13 Tiga Belas
### Delapan Ra 0.13 Tiga Belas
### Sembilan R 0.14 Empat Belas
### Satu Juta 0.14 Empat Belas
### Dua Juta 0.14 Empat Belas
### Tiga Juta 0.14 Empat Belas
### Empat Juta 0.14 Empat Belas
### Lima Juta 0.14 Empat Belas
### Enam Juta 0.14 Empat Belas
### Tujuh Juta 0.14 Empat Belas
### Delapan Ju 0.14 Empat Belas
### Sembilan J 0.14 Empat Belas
### Sepuluh Ju 0.15 Lima Belas
### Sebelas Ju 0.15 Lima Belas
### Dua Belas 0.15 Lima Belas
### Tiga Belas 0.15 Lima Belas
### Empat Bela 0.15 Lima Belas
### Lima Belas 0.15 Lima Belas
### Enam Belas 0.15 Lima Belas
### Tujuh Belas 0.15 Lima Belas
### Delapan Be 0.15 Lima Belas
### Sembilan B 0.15 Lima Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Dua Puluh 0.16 Enam Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Tiga Puluh 0.17 Tujuh Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Empat Pulu 0.18 Delapan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Lima Puluh 0.19 Sembilan Belas
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Enam Puluh 0.20 Dua Puluh
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Puluh 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Tujuh Pulu 0.21 Dua Puluh Satu
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Delapan Pu 0.22 Dua Puluh Dua
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Sembilan P 0.23 Dua Puluh Tiga
### Seratus 0.24 Dua Puluh Empat
### Dua Ratus 0.24 Dua Puluh Empat
### Tiga Ratus 0.24 Dua Puluh Empat
### Empat Ratu 0.24 Dua Puluh Empat
### Lima Ratus 0.24 Dua Puluh Empat
### Enam Ratu 0.24 Dua Puluh Empat
### Tujuh Ratu 0.24 Dua Puluh Empat
### Delapan Ra 0.24 Dua Puluh Empat
### Sembilan R 0.24 Dua Puluh Empat
### Satu Milyar 0.24 Dua Puluh Empat
### Dua Milyar 0.25 Dua Puluh Lima
### Tiga Milyar 0.25 Dua Puluh Lima
### Empat Mily 0.25 Dua Puluh Lima
### Lima Milyar 0.25 Dua Puluh Lima
### Enam Milya 0.25 Dua Puluh Lima
### Tujuh Milya 0.25 Dua Puluh Lima
### Delapan Mil 0.25 Dua Puluh Lima
### Sembilan Mi 0.25 Dua Puluh Lima
### Sepuluh Mil 0.25 Dua Puluh Lima
### Sebelas Mil 0.25 Dua Puluh Lima
### Dua Belas M 0.26 Dua Puluh Enam
### Tiga Belas 0.26 Dua Puluh Enam
### Empat Bela 0.26 Dua Puluh Enam
### Lima Belas 0.26 Dua Puluh Enam
### Enam Belas 0.26 Dua Puluh Enam
### Tujuh Belas 0.26 Dua Puluh Enam
### Delapan Bel 0.26 Dua Puluh Enam
### Sembilan Be 0.26 Dua Puluh Enam
### Dua Puluh M 0.26 Dua Puluh Enam
### Dua Puluh S 0.26 Dua Puluh Enam
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh T 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh T 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Dua Puluh 0.27 Dua Puluh Tujuh
### Tiga Puluh 0.27 Dua Puluh Tujuh
### Tiga Puluh 0.27 Dua Puluh Tujuh
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Tiga Puluh 0.28 Dua Puluh Delapan
### Empat Pulu 0.28 Dua Puluh Delapan
### Empat Pulu 0.28 Dua Puluh Delapan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Puluh 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Empat Pulu 0.29 Dua Puluh Sembilan
### Lima Puluh 0.29 Dua Puluh Sembilan
### Lima Puluh 0.29 Dua Puluh Sembilan
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Lima Puluh 0.30 Tiga Puluh
### Enam Puluh 0.30 Tiga Puluh
### Enam Puluh 0.30 Tiga Puluh
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Enam Puluh 0.31 Tiga Puluh Satu
### Tujuh Puluh 0.31 Tiga Puluh Satu
### Tujuh Puluh 0.31 Tiga Puluh Satu
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Pulu 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Pulu 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Tujuh Puluh 0.32 Tiga Puluh Dua
### Delapan Pu 0.32 Tiga Puluh Dua
### Delapan Pu 0.32 Tiga Puluh Dua
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pul 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pul 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Delapan Pu 0.33 Tiga Puluh Tiga
### Sembilan Pu 0.33 Tiga Puluh Tiga
### Sembilan Pu 0.33 Tiga Puluh Tiga
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan Pu 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan Pu 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Sembilan P 0.34 Tiga Puluh Empat
### Seratus 0.34 Tiga Puluh Empat
### Dua Ratus 0.34 Tiga Puluh Empat
### Tiga Ratus 0.35 Tiga Puluh Lima
### Empat Ratu 0.35 Tiga Puluh Lima
### Lima Ratus 0.35 Tiga Puluh Lima
### Enam Ratu 0.35 Tiga Puluh Lima
### Tujuh Ratu 0.35 Tiga Puluh Lima
### Delapan Ra 0.35 Tiga Puluh Lima
### Sembilan R 0.35 Tiga Puluh Lima
### Satu Trilyu 0.35 Tiga Puluh Lima
### Dua Trilyun 0.35 Tiga Puluh Lima
### Tiga Trilyun 0.35 Tiga Puluh Lima
### Empat Trily 0.36 Tiga Puluh Enam
### Lima Trilyu 0.36 Tiga Puluh Enam
### Enam Trily 0.36 Tiga Puluh Enam
### Tujuh Trily 0.36 Tiga Puluh Enam
### Delapan Tri 0.36 Tiga Puluh Enam
### Sembilan Tr 0.36 Tiga Puluh Enam
### Sepuluh Tri 0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.36 Tiga Puluh Enam
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
0.37 Tiga Puluh Tujuh
RAM TERBILANG
H FLAGIAT : HERIADY
CV. HAMTAR USAHA

Masukkan nilai angka yang


dimaksud (akan
-
diterjemahkan dalam huruf)
-
-
### Tiga Ratus
### Tiga Puluh Lima Juta
### Sembilan Ratus
### Delapan Puluh Ribu
400.00 Empat Ratus
31.00 Tiga Puluh Satu
- Rupiah
-
-

### ok!

Puluh Lima
sil (akan Jutaotomatis).
keluar Sembilan Ratus Delapan Puluh Ribu Empat Ratus Tiga Puluh Satu Rupiah

change any thing without


n. It could be dangerous !!!
ungkan cell yang akan diterjemahkan pada worksheet rekapitulasi pada "cell G2"
ungkan hasil di "cell F14" ke tempat "terbilang" pada worksheet rekapitulasi
e a nice season
TIME SCHEDULE
PEKERJAAN PEMBANGUNAN KONSTRUKSI RUMAH KHUSUS POLSEK TELUKJAMBE TYPE 36
TELUKJAMBE, TELUKJAMBE TIMUR
KABUPATEN KARAWANG, JAWA BARAT 41361
Tahun 2021
No. Uraian Pekerjaan Sat Bobot Bulan I Bulan II Bulan III SKALA KET
I II III IV I II III IV I II III IV
1 2 100%
I PEKERJAAN RUMAH KHUSUS T.36 ( 10 UNIT )
A PEKERJAAN PENDAHULUAN
1. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan m² 0.92 0.92
2 Pengukuran ls 0.03 0.02 0.02
3 Pemasangan Bowplank m' 0.61 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05
4 Mobilisasi dan Demobilisasi ls 0.15 0.15
5 Pekerjaan Papan Nama Proyek ls 0.03 0.03
2. PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali m³ 1.39 0.46 0.46 0.46
2 Galian Tanah Pondasi Telapak m³ 0.03 0.03
3 Urugan Pasir urug 5 cm Bawah Pondasi m³ 0.17 0.06 0.06 0.06
4 Urugan Tanah Kembali m³ 0.27 0.27
B PEKERJAAN STRUKTUR
1. PEKERJAAN PONDASI
1 Pek. Batu Kosong m³ 1.24 0.31 0.31 0.31 0.31
2 Pek. Pondasi Batu Kali m³ 5.10 1.27 1.27 1.27 1.27
3 Pek. Pondasi Telapak 40/40 t = 20 cm ( Besi Ø 10-200) m³ 0.36 0.18 0.18
2. PEKERJAAN BETON
1 Pek. Sloof 12/15 ( Besi Utama 4 Ø 10, Beugel Ø 8-150 ) m³ 2.19 0.37 0.37 0.37 0.37 0.37 0.37
2 Pek. Kolom Teras 15/15 ( Besi Utama 4 Ø 12, Beugel Ø 8-150 ) m³ 0.54 0.54
3 Pek. Kolom Praktis 12/12 ( Besi Utama 4 Ø 10, Beugel Ø 8-150 ) m³ 1.79 0.30 0.30 0.30 0.30 0.30 0.30
4 Pek. Balok Lintel Praktis 10/10 ( Besi Utama 4 Ø 8, Beugel Ø 6-150 ) m³ 0.21 0.10 0.10
5 Pek. Ring Balk 12/12 ( Besi Utama 4 Ø 10, Beugel Ø 8-150 ) m³ 2.15 0.54 0.54 0.54 0.54
6 Pek. Balok Ampig 12/15 ( Besi Utama 4 Ø 10, Beugel Ø 8-150 ) m³ 1.05 0.53 0.53
7 Pek. Rabat Beton Carport m³ 0.47 0.24 0.24
C PEKERJAAN ARSITEKTUR
1. PEKERJAAN PAS BATA, PLESTERAN & ACIAN
1 Pas. Dinding Bata Ringan 7.5 cm, Badan Utama m² 6.24 1.04 1.04 1.04 1.04 1.04 1.04
2 Pas. Dinding Bata Ringan 7.5 cm, Jabing m² 0.67 0.22 0.22 0.22
3 Pas. Dinding Bata Ringan 7.5 cm, Ampig m² 0.67 0.22 0.22 0.22
4 Pas. Plesteran Dinding m² 6.78 1.13 1.13 1.13 1.13 1.13 1.13
5 Pas. Acian Dinding m² 3.99 0.66 0.66 0.66 0.66 0.66 0.66
2. ATAP DAN PEKERJAAN PLAFOND
PEKERJAAN ATAP
1 Pas. Rangka atap Baja Ringan, Galvalum 0,75 mm m² 6.03 1.01 1.01 1.01 1.01 1.01 1.01
2 Pas. Penutup Atap Multi Roof m² 3.27 0.82 0.82 0.82 0.82
3 Pas.Talang Jurai Seng BJLS m' 0.41 0.41
4 Pas.Bubungan Metal Roof t= 0.30mm m' 0.63 0.63
PEKERJAAN PLAFOND 50%
1 Pas. Rangka Hollow 4/4,4/2 m² 3.42 0.57 0.57 0.57 0.57 0.57 0.57
2 Pas. Plafond Gypsum A-Plus Standard 9mm m² 0.94 0.24 0.24 0.24 0.24
3 Pas. List Plafond Gypsum m' 1.54 0.77 0.77
4 Pas. Plafond GRC Standard 9mm m² 0.39 0.39
5 Pas. List Wood Plank t=20 cm m' 0.81 0.41 0.41
3. PEKERJAAN KUSEN PINTU, JENDELA
1 Pas. Kusen Pintu Aluminium 4" m' 1.58 0.39 0.39 0.39 0.39
2 Pas. Daun Pintu Rangka Kayu lapis Teakwood 4mm Finish Infra Jati bh 0.98 0.24 0.24 0.24 0.24
3 Pas. Kusen Jendela Aluminium 4" m' 1.82 0.45 0.45 0.45 0.45
4 Pas. Daun Jendela Aluminium 4" bh 0.45 0.11 0.11 0.11 0.11
5 Pas. Kusen dan Pintu PVC, KM/WC unit 0.48 0.24 0.24
6 Pas. Bouvenlight Aluminium 4" m' 0.08 0.04 0.04
7 Pas. Kaca Polos 5 mm m² 0.65 0.16 0.16 0.16 0.16
8 Pas. Rooster m² 0.30 0.15 0.15
9 Pas. Engsel Pintu Psg 0.16 0.04 0.04 0.04 0.04
10 Pas. Engsel Jendela Psg 0.16 0.04 0.04 0.04 0.04
11 Pas. Kunci Pintu Utama bh 0.18 0.04 0.04 0.04 0.04
12 Pas. Kunci Pintu bh 0.53 0.13 0.13 0.13 0.13
13 Pas. Tarikan Kunci bh 0.29 0.07 0.07 0.07 0.07
14 Pas. Hak Angin bh 0.06 0.02 0.02 0.02 0.02
IV. PEKERJAAN KERAMIK
1 Pas.Lantai Keramik Keramik 40x40, Platinum White (Polished) Ruang Utama m² 6.51 1.08 1.08 1.08 1.08 1.08 1.08
2 Pas.Lantai Keramik 40x40, Platinum (Unpolished) Teras m² 0.34 0.17 0.17
3 Pas.Lantai Keramik 40x40, Platinum (Unpolished) KM/WC m² 0.41 0.20 0.20
4 Pas. Dinding Keramik 25x40, Platinum (polished) KM/WC m² 1.61 0.40 0.40 0.40 0.40
5 Pas.Lantai Keramik 20x20, Platinum White (polished) Dapur m² 0.20 0.10 0.10
6 Pas. Dinding Keramik 20x20, Platinum White (polished) Dapur m² 0.33 0.16 0.16
Tahun 2021
No. Uraian Pekerjaan Sat Bobot Bulan I Bulan II Bulan III SKALA KET
I II III IV I II III IV I II III IV
1 2 100%
D PEKERJAAN MEKANIKAL & ELEKTRIKAL
1. ELEKTRIKAL
1 Pas. Instalasi Titik Lampu Lengkap, Pasang Counduit Setara Clipsal ttk 1.03 0.26 0.26 0.26 0.26
2 Pas. Instalasi Titik Stop Kontak Lengkap, Pasang Counduit Setara Clipsal ttk 0.49 0.12 0.12 0.12 0.12
3 Pas. Instalasi Titik Stop Kontak Tv Lengkap, Pasang Counduit Setara Clipsal ttk 0.12 0.03 0.03 0.03 0.03
4 Pas. Lampu Down Light 3" Ex Philip bh 0.40 0.10 0.10 0.10 0.10
5 Pas. Lampu Led 12 Watt Ex Philip bh 0.14 0.03 0.03 0.03 0.03
6 Pasang. Saklar Double Ex. Broco bh 0.06 0.03 0.03
7 Pasang. Saklar Single Ex. Broco bh 0.08 0.04 0.04
8 Lp-1 (Panel Listrik Normal) unit Box Mcb unit 0.40 0.20 0.20
9 Pas. Meter Listrik KWH 1300 W unit 1.85 0.93 0.93
2. MEKANIKAL
1 Pek. Pipa PVC AW 3/4 " m' 0.20 0.05 0.05 0.05 0.05
2 Pek. Pipa PVC AW 3 " m' 0.45 0.11 0.11 0.11 0.11
3 Pek. Pipa PVC AW 4 " m' 0.77 0.38 0.38
4 Pek. Kran Air bh 0.16 0.16
5 Pek. Closet Jongkok Porselin Warna Putih unit 0.47 0.47
6 Pek. Floor draine unit 0.10 0.10
7 Pek. Septictank unit 3.25 1.08 1.08 1.08
8 Pek. Torn 250 ltr + Instalasi unit 1.54 0.51 0.51 0.51
9 Pek. Sumur + Pompa Pendorong dan Instalasi unit 1.85 0.93 0.93
E PEKERJAAN LABURAN
1 Pengecatan Dinding Interior Vinylex White m² 2.06 0.52 0.52 0.52 0.52
2 Pengecatan Dinding Exterior Vinilex NP N 1824 P-Little Angel ( Badan Utama ) m² 1.07 0.27 0.27 0.27 0.27
3 Pengecatan Dinding Exterior Vinilex NP N 187 6 A-Sable Brown (Variasi Depan) m² 0.60 0.15 0.15 0.15 0.15
4 Pengecatan Plafond Vinylex White m² 1.37 0.34 0.34 0.34 0.34
5 Pengecatan List Woodplank Seiv Gloss White m² 0.24 0.06 0.06 0.06 0.06
F PEKERJAAN LAIN-LAIN
1 Pek, Taman ls #REF! #REF!
II PEKERJAAN FASILITAS UMUM
A PEKERJAAN GAPURA
1 Pek. Galian Tanah Pondasi Telapak m³ #REF! #REF!
2 Pek. Urugan Tanah Kembali m³ #REF! #REF!
3 Pek. Pondasi Telapak 100/100 t = 25 cm ( Besi Ø 12-200) m³ #REF! #REF! #REF!
4 Pek. Pembetonan Kolom 25/25 ( Besi Utama 8 Ø 12, Beugel Ø 8-150 ) m³ #REF! #REF! #REF!
5 Pas. Dinding Bata Ringan 7.5 cm m² #REF! #REF!
6 Pas. Plesteran Dinding m² #REF! #REF! #REF!
7 Pas. Acian Dinding m² #REF! #REF! #REF!
8 Pengecatan Dinding Exterior Vinilex NP N 187 6 A-Sable Brown (Variasi Depan) m² #REF! #REF! #REF!
9 Pas. Lambang POLRI ( 70 cm x 60 cm ) Plat t=3mm lapis stiker Unit #REF! #REF!
B PEKERJAAN U-DITCH (PANJANG = 65M: UKURAN = 0,30/0,030 M')
1 Galian Tanah (Manual+Truck) m³ 0.08 0.03
2 Saluran Berbentuk U Tipe DS 5 (30/30) m' 1.73 0.58 0.58 0.58
3 Cover U-Ditch 30 (lb. 0,39 M) m' 0.93 0.46 0.46
4 Beton Siklop f'c=15 Mpa (K-175) m³ 0.10 0.05 0.05
C PEKERJAAN PENERANGAN JALAN UMUM + LAMPU TAMAN
1 Pas. Instalasi Titik PJU ( Kabel Twist sr 2x10 mm )+asesories ttk 0.06 0.03 0.03
2 Pas. Instalasi Titik Lampu Sorot+ Lampu Taman( Kabel Twist sr 2x10 mm )+asesories ttk 0.05 0.03 0.03
3 Pas. Tiang Besi Galvanis 3" Finish Cat ttk 0.14 0.14
4 Pas. Lampu Jalan PJU LED 90 W Solar CELL all in one bh 0.18 0.18
5 Pas. Lampu sorot 30 Watt Ex Philip LED25 BVP150 (Gapura) bh 0.05 0.05
6 Pas. Lampu Taman 30 Watt Ex Philip LED25 BVP150 bh 0.05 0.05
7 Pasang. Saklar Double Ex. Broco bh 0.01 0.01
8 Lp-1 (Panel Listrik Normal) unit Box Mcb unit 0.04 0.04
9 Pas. Meter Listrik KWH 1300 W unit 0.19 0.19
D PEKERJAAN TAMAN DEPAN KANTOR POLSEK ( 22 m²)
1 Pembersihan Lahan m³ 0.03 0.03
2 Pek. Urugan Tanah m³ 0.09 0.09
3 Penanaman Rumput Gajah m³ 0.20 0.10 0.10
4 Penanaman Pohon Perdu m³ 0.10 0.05 0.05
5 Pengecatan dan Perapihan kembali area taman ls 0.06 0.06
E PEKERJAAN PAS HURUF TIMBUL STAINLESS ( 21 Bh) - -
1 Pas. Huruf Timbul Stainless ( T= 25cm ) bh 0.36 0.36
F PEKERJAAN PELEBARAN JALAN BETON (RIGID) ( P= 120m, L=0,5m, T=0,25m)
1 Ampar LPA Klas B Tebal 15 cm m³ 0.19 0.10 0.10
2 Ampar LPA Klas A Tebal 10 cm m³ 0.14 0.07 0.07
3 Rigid Beton K-300 Tebal 17 cm m³ 0.93 0.93
Bobot #REF! 2.21 2.35 8.04 7.41 8.34 9.24 14.83 #REF! #REF! #REF! #REF! #REF!
Jumlah Kumulatif Bobot 2.21 4.56 12.60 20.00 28.34 37.59 52.41 #REF! #REF! #REF! #REF! #REF!

1 2 3 4 5 6 7 8 9 10 11 12

Anda mungkin juga menyukai