Anda di halaman 1dari 59

Rp 571,275,000 LIMA RAT

###
LIMA RATUS TUJUH
PULUH SATU JUTA DUA
RATUS TUJUH PULUH
LIMA RIBU RUPIAH,- 0
1
Terbilang : ( ,-) 2
REKAPITULASI
INSTANSI : DINAS KESEHATAN
NAMA KEGIATAN : PERENCANAAN REHABILITASI BERAT PUSKESMAS PERAWATAN
NAMA PEKERJAAN : PERENCANAAN REHABILITASI BERAT PUSKESMAS PERAWATAN
LOKASI : PUSKESMAS TIKALA
SUMBER DANA : TUGAS PEMBANTUAN (TP) KABUPATEN TORAJA UTARA
TAHUN ANGGARAN : 2013

NO. URAIAN PEKERJAAN JUMLAH BIAYA

a b c

A PEKERJAAN PERSIAPAN Rp. 11,645,700.00


B PEKERJAAN TANAH DAN PASIR Rp. 29,866,750.48
C PEKERJAAN BATU, BETON, PLESTERAN DAN ACIAN Rp. 135,377,257.27
D PEKERJAAN KERAMIK Rp. 64,419,480.78
E PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND Rp. 139,613,936.52
F PEKERJAAN KUSEN, PINTU, JENDELA DAN PENGUNCI Rp. 79,314,168.95
G PEKERJAAN PENGECATAN Rp. 15,720,668.58
H PEKERJAAN INSTALASI LISTRIK Rp. 10,660,000.00
I PEKERJAAN KAMAR MANDI/WC Rp. 30,068,828.60
J PEKERJAAN AKHIR Rp. 2,655,000.00

A REAL COST Rp. 519,341,791.18


D PPN 10 % Rp. 51,934,179.12
F JUMLAH Rp. 571,275,970.30
G DUBULATKAN Rp. 571,275,000.00

Terbilang : (LIMA RATUS TUJUH PULUH SATU JUTA DUA RATUS TUJUH PULUH LIMA RIBU RUPIAH,-,-)

Rantepao, Juli 2013


KONSULTAN PERENCANA
CV. MAHAPANI KONSULTAN

Ir. MUH. NASRUN


DIREKTUR
ESTMATE ENGINEER ( EE )
INSTANSI : DINAS KESEHATAN
NAMA KEGIATAN : PERENCANAAN REHABILITASI BERAT PUSKESMAS PERAWATAN
NAMA PEKERJAAN : PERENCANAAN REHABILITASI BERAT PUSKESMAS PERAWATAN
LOKASI : PUSKESMAS TIKALA
SUMBER DANA : TUGAS PEMBANTUAN (TP) KABUPATEN TORAJA UTARA
TAHUN ANGGARAN : 2013

NO HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SAT. ANAL- SATUAN BIAYA
LISA (Rp.) (Rp.)
a b d e f g

A PEKERJAAN PERSIAPAN

1 Pengukuran dan pemasangan Bouwplank 28.000 M¹ 1 58,775.00 1,645,700.00


2 Papan Nama Proyek 1.000 Ls Ls 500,000.00 500,000.00
3 Dokumentasi dan Administrasi 1.000 Ls Ls 2,000,000.00 2,000,000.00
4 Membersihkan lapangan dan perataan 1.000 Ls Ls 3,500,000.00 3,500,000.00
5 Direksi Keet 1.000 Ls Ls 3,500,000.00 3,500,000.00
6P3K 1.000 Ls Ls 500,000.00 500,000.00
Jumlah (A) 11,645,700.00
B PEKERJAAN TANAH DAN PASIR

1 Pek. Galian Tanah keras sedalam 1,00 M 33.731 M³ 3 10,520,500.00 1,971,169.92


2 Pek. Urugan Kembali 5.622 M³ 5 17,700.00 100,923.90
3 Pek. Timbunan Tanah 106.820 M³ 8 14,750.00 20,012,727.00
4 Pek. Urugan Pasir 7.590 M³ 7 97,558.50 2,788,094.66
5 Pek. Pemadatan Tanah 106.820 M³ 6 737,692.00 4,993,835.00
Jumlah (B) 29,866,750.48
C PEKERJAAN BATU, BETON, PLESTERAN DAN ACIAN

1 Pek. Pasangan Batu Kosong 8.995 M³ 9 14,750.00 132,676.25


2 Pek. Pasangan Batu Gunung/Kali 1 Pc : 5 Ps 17.348 M³ 10 58,775.00 1,019,599.31
3 Pek. Sloef Beton 1 Pc : 2 Ps : 3 Kr 1.928 M³ 20 5,054,136.00 9,741,847.14
4 Pek. Kolom Beton 1 Pc : 2 Ps : 3 Kr Type K1 2.070 M³ 21 6,409,736.00 13,268,153.52
5 Pek. Kolom Beton 1 Pc : 2 Ps : 3 Kr Type K2 0.720 M³ 23 6,409,736.00 4,615,009.92
6 Pek. Ring balk + konsol 1 Pc : 2 Ps : 3 Kr 2.108 M³ 24 6,416,666.00 13,523,123.60
7 Pek Beton Plat dapur 1 Pc : Ps : 2 Ps : 3Kr 0.537 M³ 21 6,409,736.00 3,442,028.23
8 Pek Beton Tumbuk 1 Pc : Ps : 3 Ps : 5Kr 16.800 M³ 19 945,726.00 15,888,196.80
9 Pek. Pasangan Batu Bata 1 Pc : 5 Ps 186.04 M² 14 137,700.76 25,617,835.62
10 Pek. Penebalan Batu Bata (di alur per 20 cm) - M² 12 139,203.00 #VALUE!
11 Pek. Pas. Batu Sisir warna hitam Kolom Teras - M² 30 297,417.60 #VALUE!
12 Pek. Dinding Trasraam 1 Pc : 2 Ps - M² 12 58,775.00 #VALUE!
13 Pek. Plesteran 1 Pc : 4 Ps 372.080 M² 16 58,775.00 21,868,990.25
14 Pek. Plesteran 1 Pc : 2 Ps - M² 15 58,775.00 #VALUE!
15 Pek. Acian/Siaran 1 Pc : 2 Ps 372.080 M² 18 25,072.40 9,328,933.58
Jumlah (C) 135,377,257.27
D PEKERJAAN KERAMIK

1 Pas. Keramik Lantai Ruang 60 x 60 cm 180.875 M² 25 338,984.80 61,313,875.70


2 Pas. Keramik Dinding KM/WC 20 x 25 cm 6.075 M² 26 281,960.16 1,712,907.97
3 Pas. Lantai KM/WC 20 x 20 cm 4.800 M² 28 242,417.60 1,163,604.48
4 Pas. Keramik meja beton 20 x 25 cm 0.813 M² 26 281,960.16 229,092.63
Jumlah (D) 64,419,480.78
E PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND

1 Pek. Kuda-Kuda 6/12 Kayu Kls. II 3.788 M³ 35 9,631,000.00 36,480,070.66


2 Pek. Gording 5/10 Kayu Kls II 1.899 M³ 37 8,970,375.00 17,031,153.98
4 Pas. Atap Spandek (Zinckalume) 315.484 M² 43 119,260.00 37,624,597.99
5 Pas. Nok Seng Plat Alm. 26.640 M¹ 45 64,410.00 1,715,882.40
6 Pas. Listplank Kalsi Plank L=30cm, T=0,8 mm 76.980 M¹ 39 102,175.00 7,865,431.50
7 Pek. Rangka Plafond 4/6 Kayu Kls. III (1 x 1) 252.000 M² 38 89,875.00 22,648,500.00
8 Pas. List Plafond Datar 1 x 3 cm 538.000 M¹ 41 14,415.00 7,755,270.00
9 Pas. Plafond Tripleks t = 4,00 mm 252.000 M² 40 33,702.50 8,493,030.00
10 Pek. Ukiran Toraja Lindo Para Teras Ls 3,999,395.78 -
Jumlah (E) 139,613,936.52
F PEKERJAAN KUSEN, PINTU, JENDELA DAN PENGUNCI

1 Pek. Kusen Pintu dan Jendela Kayu Kls. II 2.173 M³ 29 10,520,500.00 22,858,416.38
2 Pas. Pintu Panil t = 3.50 cm Kayu Kls II 32.325 M² 30 772,750.00 24,979,298.30
3 Pek. Bingkai Jendela Kayu Kls. II 17.730 M² 32 430,600.00 7,634,451.88
4 Pas. Kunci Tanam 2 Slag 4.000 Bh 51 172,975.00 691,900.00
5 Pas. Kunci Tanam 1 Slag 12.000 Bh 52 151,487.50 1,817,850.00
6 Pas. Engsel Pintu 86.000 Psg 53 43,551.25 3,745,407.50
7 Pas. Engsel Jendela 132.000 Psg 54 30,367.50 4,008,510.00
8 Pas. Grendel Jendela 82.000 Bh 58 61,487.50 5,041,975.00
9 Pas. Hak Angin dan Kait-Kait 64.000 Psg 55 38,551.25 2,467,280.00
10 Pas. Grendel Pintu 2.000 Psg 57 61,487.50 122,975.00
11 Pas. Kaca Mati 5 mm 18.848 M² 34 174,551.25 3,289,907.05
12 Pas. Jalusi kayu Kls II 3.649 M² 33 727,875.00 2,656,197.84
Jumlah (F) 79,314,168.95
G PEKERJAAN PENGECATAN

1 Pek. Pengecatan Dinding tembok 372.080 M² 48 21,982.50 8,179,244.20


2 Pek. Pengecatan Kayu 50.250 M² 46 39,837.50 2,001,834.38
3 Pek. Pengecatan Plafond 252.000 M² 48 21,982.50 5,539,590.00

Jumlah (G) 15,720,668.58


H PEKERJAAN INSTALASI LISTRIK

1 Pek. Titik Cahaya + Upah 22.000 Titik Ls 80,000.00 1,760,000.00


2 Pas. Stop Kontak + Upah 11.000 Bh Ls 50,000.00 550,000.00
3 Pas. Sakelar Ganda + Upah 2.000 Bh Ls 55,000.00 110,000.00
4 Pas. Sakelar Tunggal + Upah 12.000 Bh Ls 55,000.00 660,000.00
5 Pas. Fitting Lampu + Upah 22.000 Bh Ls 20,000.00 440,000.00
6 Lampu Neon Kapsul 18 watt dan Upah 20.000 Bh Ls 60,000.00 1,200,000.00
7 Lampu Neon Kapsul 5 watt dan Upah 4.000 Bh Ls 40,000.00 160,000.00
8 Pas. Pipa Master Cover Box (MCB) + Upah 1.000 Set Ls 780,000.00 780,000.00
9 Pemasangan Daya 1800 Watt 1.000 Set Ls 5,000,000.00 5,000,000.00
Jumlah (H) 10,660,000.00
I PEKERJAAN KAMAR MANDI/WC

1 Pas. Kloset Jongkok porselen 2.000 Bh 59 737,692.00 1,475,384.00


2 Pas. Bak Fibreglass 2.000 Bh 63 774,850.00 1,549,700.00
3 Pas. Kran Ø ¾ 3.000 Bh 66 49,112.50 147,337.50
4 Pas. Floor Drain 3.000 Bh 65 47,975.00 143,925.00
5 Pas. Pipa PVC tipe AW Ø ¾" 30.000 M¹ 68 23,973.00 719,190.00
6 Pas. Pipa PVC tipe AW Ø 4" 46.000 M1 69 97,558.50 4,487,691.00
7 Pas. Saluran Keliling 40.846 M¹ 71 147,309.00 6,017,012.00
8 Pas. Washtafel 1.000 Bh 61 848,740.00 848,740.00
9 Pas. Kitchenzink Alminium 1.000 Bh 64 577,102.50 577,102.50
10 Pek. Septick tank + Peresapan
a. Pek. Galian Tanah keras 22.060 M³ 3 10,520,500.00 232,082,230.00
b. Pek. Urugan Tanah 6.620 M³ 5 17,700.00 117,174.00
c. Pek. Urugan Pasir 0.840 M³ 7 97,558.50 81,949.14
d. Pek. Pasangan Batu Gunung/Kali 1 Pc : 5 Ps 0.620 M³ 10 58,775.00 36,440.50
e. Pek. Dinding Trasraam 1 Pc : 2 Ps 32.040 M² 12 58,775.00 1,883,151.00
f. Pek. Plesteran 1 : 2 34.620 M² 15 58,775.00 2,034,790.50
g. Pek Beton Plat 1 Pc : Ps : 2 Ps : 3Kr 0.840 M³ 21 6,409,736.00 5,384,178.24
Jumlah (I) 30,068,828.60
J PEKERJAAN AKHIR

1 Pek. Pembersihan Sisa Bangunan 180.000 M² 72 14,750.00 2,655,000.00

Jumlah (J) 2,655,000.00

Rantepao, Juli 2013

KONSULTAN PERENCANA
CV. MAHAPANI KONSULTAN

Ir. MUH. NASRUN


DIREKTUR
DAFTAR ANALISA
BERDASARKAN SNI 2002
1. 1 M¹ Pengukuran dan Pemasangan Bouwplank
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)
I BAHAN
1 Balok Kls. IV M³ 0.0120 2,000,000.00 24,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.0200 30,000.00 600.00
3 Papan Kls. IV M³ 0.0070 2,000,000.00 14,000.00

II TENAGA
1 Pekerja Org/Hari 0.1000 80,000.00 8,000.00
2 Tukang Kayu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0050 135,000.00 675.00

Jumlah 58,775.00

2. 1 M³ Galian Tanah Biasa Sedalam 1,00 Meter


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

1 Pekerja Org/Hari 0.4000 80,000.00 32,000.00


2 Mandor Org/Hari 0.0400 135,000.00 5,400.00

Jumlah 37,400.00

3. 1 M³ Galian Tanah Keras Sedalam 1,00 Meter


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

1 Pekerja Org/Hari 0.6250 80,000.00 50,000.00


2 Mandor Org/Hari 0.0625 135,000.00 8,437.50

Jumlah 58,437.50

4. 1 M³ Galian Tanah Cadas Sedalam 1,00 Meter


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

1 Pekerja Org/Hari 1.2500 80,000.00 100,000.00


2 Mandor Org/Hari 0.1250 135,000.00 16,875.00

Jumlah 116,875.00

5. 1 M³ Urugan Kembali

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

1 Pekerja Org/Hari 0.1920 80,000.00 15,360.00


2 Mandor Org/Hari 0.0192 135,000.00 2,592.00

Jumlah 17,952.00
6. 1 M³ Pemadatan Tanah
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

1 Pekerja Org/Hari 0.5000 80,000.00 40,000.00


2 Mandor Org/Hari 0.0500 135,000.00 6,750.00

Jumlah 46,750.00

7. 1 M³ Urugan Pasir
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Pasir Urug/Timbunan M³ 1.2000 285,000.00 342,000.00

II TENAGA
1 Pekerja Org/Hari 0.3000 80,000.00 24,000.00
2 Mandor Org/Hari 0.0100 135,000.00 1,350.00
-
Jumlah 367,350.00

8. 1 M³ Timbunan Tanah
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Tanah Timbunan M³ 1.2000 135,000.00 162,000.00

II TENAGA
1 Pekerja Org/Hari 0.3000 80,000.00 24,000.00
2 Mandor Org/Hari 0.0100 135,000.00 1,350.00

Jumlah 187,350.00

9. 1 M³ Pasangan Batu Kosong

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Batu Gunung/Batu Kali M³ 1.2000 345,000.00 414,000.00
2 Pasir Urug/Timbunan M³ 0.3000 285,000.00 85,500.00

II TENAGA
1 Pekerja Org/Hari 0.7800 80,000.00 62,400.00
2 Tukang Batu Org/Hari 0.3900 100,000.00 39,000.00
3 Kepala Tukang Org/Hari 0.0390 150,000.00 5,850.00
4 Mandor Org/Hari 0.0390 135,000.00 5,265.00

Jumlah 612,015.00
10. 1 M³ Pasangan Batu Gunung/Kali 1 Pc : 5 Ps
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Batu Gunung/Batu Kali M³ 1.1000 345,000.00 379,500.00
2 Semen Pc 50 Kg Zak 2.7200 61,600.00 167,552.00
3 Pasir Pasang M³ 0.5440 370,000.00 201,280.00

II TENAGA
1 Pekerja Org/Hari 1.5000 80,000.00 120,000.00
2 Tukang Batu Org/Hari 0.6000 100,000.00 60,000.00
3 Kepala Tukang Org/Hari 0.0600 150,000.00 9,000.00
4 Mandor Org/Hari 0.0750 135,000.00 10,125.00

Jumlah 947,457.00

11. 1 M³ Pasangan Batu Gunung/Kali 1 Pc : 4 Ps


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Batu Gunung/Batu Kali M³ 1.1000 345,000.00 379,500.00
2 Semen Pc 50 Kg Zak 3.2600 61,600.00 200,816.00
3 Pasir Pasang M³ 0.5200 370,000.00 192,400.00

II TENAGA
1 Pekerja Org/Hari 1.5000 80,000.00 120,000.00
2 Tukang Batu Org/Hari 0.6000 100,000.00 60,000.00
3 Kepala Tukang Org/Hari 0.0600 150,000.00 9,000.00
4 Mandor Org/Hari 0.0750 135,000.00 10,125.00

Jumlah 971,841.00

12. 1 M² Pasangan Batu Bata 1 Pc : 2 Ps


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Batu Bata Standar (Kls. I) Biji 70.0000 1,000.00 70,000.00
2 Semen Pc 50 Kg Zak 0.3790 61,600.00 23,346.40
3 Pasir Pasang M³ 0.0330 370,000.00 12,210.00

II TENAGA
1 Pekerja Org/Hari 0.3200 80,000.00 25,600.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0150 135,000.00 2,025.00

Jumlah 144,681.40
13. 1 M² Pasangan Batu Bata 1 Pc : 4 Ps
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Batu Bata Standar (Kls. I) Biji 70.0000 1,000.00 70,000.00
2 Semen Pc 50 Kg Zak 0.2300 61,600.00 14,168.00
3 Pasir Pasang M³ 0.0430 370,000.00 15,910.00

II TENAGA
1 Pekerja Org/Hari 0.3200 80,000.00 25,600.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0150 135,000.00 2,025.00

Jumlah 139,203.00

14. 1 M² Pasangan Batu Bata 1 Pc : 5 Ps


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Batu Bata Standar (Kls. I) Biji 70.0000 1,000.00 70,000.00
2 Semen Pc 50 Kg Zak 0.1936 61,600.00 11,925.76
3 Pasir Pasang M³ 0.0450 370,000.00 16,650.00

II TENAGA
1 Pekerja Org/Hari 0.3200 80,000.00 25,600.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0150 135,000.00 2,025.00

Jumlah 137,700.76

15. 1 M² Plesteran 1 Pc : 2 Ps
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Semen Pc 50 Kg Zak 0.1704 61,600.00 10,496.64
2 Pasir Pasang M³ 0.0170 370,000.00 6,290.00

II TENAGA
1 Pekerja Org/Hari 0.2000 80,000.00 16,000.00
2 Tukang Batu Org/Hari 0.1500 100,000.00 15,000.00
3 Kepala Tukang Org/Hari 0.0150 150,000.00 2,250.00
4 Mandor Org/Hari 0.0100 135,000.00 1,350.00

Jumlah 51,386.64
16. 1 M² Plesteran 1 Pc : 4 Ps
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Semen Pc 50 Kg Zak 0.1040 61,600.00 6,406.40
2 Pasir Pasang M³ 0.0200 370,000.00 7,400.00

II TENAGA
1 Pekerja Org/Hari 0.2000 80,000.00 16,000.00
2 Tukang Batu Org/Hari 0.1500 100,000.00 15,000.00
3 Kepala Tukang Org/Hari 0.0150 150,000.00 2,250.00
4 Mandor Org/Hari 0.0100 135,000.00 1,350.00

Jumlah 48,406.40

17. 1 M² Plesteran 1 Pc : 5 Ps

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Semen Pc 50 Kg Zak 0.0860 61,600.00 5,297.60
2 Pasir Pasang M³ 0.0220 370,000.00 8,140.00

II TENAGA
1 Pekerja Org/Hari 0.2000 80,000.00 16,000.00
2 Tukang Batu Org/Hari 0.1500 100,000.00 15,000.00
3 Kepala Tukang Org/Hari 0.0150 150,000.00 2,250.00
4 Mandor Org/Hari 0.0100 135,000.00 1,350.00

Jumlah 48,037.60

18. 1 M² Acian/Siaran 1 Pc : 2 Ps
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Semen Pc 50 Kg Zak 0.0640 61,600.00 3,942.40

II TENAGA
1 Pekerja Org/Hari 0.1500 80,000.00 12,000.00
2 Tukang Batu Org/Hari 0.0700 100,000.00 7,000.00
3 Kepala Tukang Org/Hari 0.0070 150,000.00 1,050.00
4 Mandor Org/Hari 0.0080 135,000.00 1,080.00

Jumlah 25,072.40
19. 1 M³ Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Semen Pc 50 Kg Zak 4.3600 61,600.00 268,576.00
2 Pasir Beton M³ 0.5200 370,000.00 192,400.00
3 Sirtu/Kerikil/Koral M³ 0.8700 360,000.00 313,200.00

II TENAGA
1 Pekerja Org/Hari 1.6500 80,000.00 132,000.00
2 Tukang Batu Org/Hari 0.2500 100,000.00 25,000.00
3 Kepala Tukang Org/Hari 0.0250 150,000.00 3,750.00
4 Mandor Org/Hari 0.0800 135,000.00 10,800.00

Jumlah 945,726.00

20. 1 M³ Beton Bertulang 1 Pc : 2 Ps : 3 Kr Untuk Sloef


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Papan Kls. IV M³ 0.2700 2,000,000.00 540,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 2.0000 30,000.00 60,000.00
3 Minyak Bekisting Ltr 0.6000 18,000.00 10,800.00
4 Besi Beton Polos kg 175.000 15,500.00 2,712,500.00
5 Kawat Beton kg 3.0000 17,500.00 52,500.00
6 Semen Pc 50 Kg Zak 6.4600 61,600.00 397,936.00
7 Pasir Beton M³ 0.5200 370,000.00 192,400.00
8 Batu Pecah (1 - 2 cm) M³ 0.7800 380,000.00 296,400.00

II TENAGA
1 Pekerja Org/Hari 4.8500 80,000.00 388,000.00
2 Tukang Batu Org/Hari 0.3500 100,000.00 35,000.00
3 Tukang Kayu Org/Hari 1.5600 100,000.00 156,000.00
4 Tukang Besi Org/Hari 1.4000 100,000.00 140,000.00
5 Kepala Tukang Org/Hari 0.3310 150,000.00 49,650.00
6 Mandor Org/Hari 0.1700 135,000.00 22,950.00

Jumlah 5,054,136.00
21. 1 M³ Beton Bertulang 1 Pc : 2 Ps : 3 Kr Untuk Kolom dan Plat
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Papan Kls. IV M³ 0.4000 2,000,000.00 800,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 4.0000 30,000.00 120,000.00
3 Minyak Bekisting Ltr 2.0000 18,000.00 36,000.00
4 Besi Beton Polos kg 150.0000 15,500.00 2,325,000.00
5 Kawat Beton kg 4.5000 17,500.00 78,750.00
6 Semen Pc 50 Kg Zak 6.4600 61,600.00 397,936.00
7 Pasir Beton M³ 0.5200 370,000.00 192,400.00
8 Batu Pecah (1 - 2 cm) M³ 0.7800 380,000.00 296,400.00
9 Balok Kls. IV M³ 0.1500 2,000,000.00 300,000.00
10 Tripleks 3 mm Lbr 3.5000 50,000.00 175,000.00
11 Dolken Ø 8 cm - 4 m Btg 20.0000 20,500.00 410,000.00

II TENAGA
1 Pekerja Org/Hari 7.3000 80,000.00 584,000.00
2 Tukang Batu Org/Hari 0.3500 100,000.00 35,000.00
3 Tukang Kayu Org/Hari 3.3000 100,000.00 330,000.00
4 Tukang Besi Org/Hari 2.1000 100,000.00 210,000.00
5 Kepala Tukang Org/Hari 0.5700 150,000.00 85,500.00
6 Mandor Org/Hari 0.2500 135,000.00 33,750.00

Jumlah 6,409,736.00

22. 1 M³ Beton Bertulang 1 Pc : 2 Ps : 3 Kr Untuk Balok


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Papan Kls. IV M³ 0.3200 2,000,000.00 640,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 3.2000 30,000.00 96,000.00
3 Minyak Bekisting Ltr 1.6000 18,000.00 28,800.00
4 Besi Beton Polos kg 175.0000 15,500.00 2,712,500.00
5 Kawat Beton kg 3.0000 17,500.00 52,500.00
6 Semen Pc 50 Kg Zak 6.4600 61,600.00 397,936.00
7 Pasir Beton M³ 0.5200 370,000.00 192,400.00
8 Batu Pecah (1 - 2 cm) M³ 0.7800 380,000.00 296,400.00
9 Balok Kls. IV M³ 0.1400 2,000,000.00 280,000.00
10 Plywood 9 mm Lbr 2.8000 130,000.00 364,000.00
11 Dolken Ø 8 cm - 4 m Btg 16.0000 20,500.00 328,000.00

II TENAGA
1 Pekerja Org/Hari 5.9600 80,000.00 476,800.00
2 Tukang Batu Org/Hari 0.3500 100,000.00 35,000.00
3 Tukang Kayu Org/Hari 2.8000 100,000.00 280,000.00
4 Tukang Besi Org/Hari 1.4000 100,000.00 140,000.00
5 Kepala Tukang Org/Hari 0.4550 150,000.00 68,250.00
6 Mandor Org/Hari 0.2080 135,000.00 28,080.00

Jumlah 6,416,666.00
23. 1 M¹ Beton Bertulang 1 Pc : 2 Ps : 3 Kr Untuk Kolom Praktis
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Papan Kls. IV M³ 0.0020 2,000,000.00 4,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.0100 30,000.00 300.00
3 Besi Beton Polos kg 3.0000 15,500.00 46,500.00
4 Kawat Beton kg 0.4500 17,500.00 7,875.00
5 Semen Pc 50 Kg Zak 0.0800 61,600.00 4,928.00
6 Pasir Beton M³ 0.0060 370,000.00 2,220.00
7 Batu Pecah (1 - 2 cm) M³ 0.0090 380,000.00 3,420.00

II TENAGA
1 Pekerja Org/Hari 0.0600 80,000.00 4,800.00
2 Tukang Batu Org/Hari 0.0200 100,000.00 2,000.00
3 Tukang Kayu Org/Hari 0.0200 100,000.00 2,000.00
4 Tukang Besi Org/Hari 0.0200 100,000.00 2,000.00
5 Kepala Tukang Org/Hari 0.0060 150,000.00 900.00
6 Mandor Org/Hari 0.0030 135,000.00 405.00

Jumlah 81,348.00

24. 1 M¹ Beton Bertulang 1 Pc : 2 Ps : 3 Kr Untuk Ringbalk


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Papan Kls. IV M³ 0.0030 2,000,000.00 6,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.0200 30,000.00 600.00
3 Besi Beton Polos kg 3.6000 15,500.00 55,800.00
4 Kawat Beton kg 0.0500 17,500.00 875.00
5 Semen Pc 50 Kg Zak 0.1100 61,600.00 6,776.00
6 Pasir Beton M³ 0.0090 370,000.00 3,330.00
7 Batu Pecah (1 - 2 cm) M³ 0.0150 380,000.00 5,700.00

II TENAGA
1 Pekerja Org/Hari 0.1000 80,000.00 8,000.00
2 Tukang Batu Org/Hari 0.0330 100,000.00 3,300.00
3 Tukang Kayu Org/Hari 0.0330 100,000.00 3,300.00
4 Tukang Besi Org/Hari 0.0330 100,000.00 3,300.00
5 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
6 Mandor Org/Hari 0.0060 135,000.00 810.00

99,291.00

25 1 M² Pasangan Lantai Keramik 60 x 60 cm


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Tegel Keramik Polos 60 x 60 cm Dos 1.0000 115,000.00 115,000.00
2 Semen Pc 50 Kg Zak 0.2280 61,600.00 14,044.80
3 Pasir Pasang M³ 0.0420 370,000.00 15,540.00
4 Semen Warna Zak 1.5000 67,000.00 100,500.00

II TENAGA
1 Pekerja Org/Hari 0.6200 80,000.00 49,600.00
2 Tukang Batu Org/Hari 0.3500 100,000.00 35,000.00
3 Kepala Tukang Org/Hari 0.0350 150,000.00 5,250.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 338,984.80
26 1 M² Pasangan Lantai Keramik 40 x 40 cm
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Tegel Keramik 20 x 25 cm Dos 1.0000 58,000.00 58,000.00
2 Semen Pc 50 Kg Zak 0.2280 61,600.00 14,044.80
3 Pasir Pasang M³ 0.0420 370,000.00 15,540.00
4 Semen Warna Zak 1.5000 67,000.00 100,500.00

II TENAGA
1 Pekerja Org/Hari 0.6200 80,000.00 49,600.00
2 Tukang Batu Org/Hari 0.3500 100,000.00 35,000.00
3 Kepala Tukang Org/Hari 0.0350 150,000.00 5,250.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 281,984.80

27 1 M² Pasangan Dinding Keramik 20 x 25 cm


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Tegel Keramik 20 x 25 cm Dos 1.0000 58,000.00 58,000.00
2 Semen Pc 50 Kg Zak 0.2276 61,600.00 14,020.16
3 Pasir Pasang M³ 0.0420 370,000.00 15,540.00
4 Semen Warna Zak 1.5000 67,000.00 100,500.00

II TENAGA
1 Pekerja Org/Hari 0.6200 80,000.00 49,600.00
2 Tukang Batu Org/Hari 0.3500 100,000.00 35,000.00
3 Kepala Tukang Org/Hari 0.0350 150,000.00 5,250.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 281,960.16

28 1 M² Pasangan Lantai Keramik 30 x 30 cm

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Tegel Keramik Polos 30 x 30 cm Dos 1.0000 55,000.00 55,000.00
2 Semen Pc 50 Kg Zak 0.2830 61,600.00 17,432.80
3 Pasir Pasang M³ 0.0390 370,000.00 14,430.00
4 Semen Warna Zak 2.0000 67,000.00 134,000.00

II TENAGA
1 Pekerja Org/Hari 0.6200 80,000.00 49,600.00
2 Tukang Batu Org/Hari 0.3500 100,000.00 35,000.00
3 Kepala Tukang Org/Hari 0.0350 150,000.00 5,250.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 314,762.80
29 1 M² Pasangan Lantai Keramik 20 x 20 cm
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Tegel Keramik Polos 30 x 30 cm Dos 1.0000 55,000.00 55,000.00
2 Semen Pc 50 Kg Zak 0.1860 61,600.00 11,457.60
3 Pasir Pasang M³ 0.0180 370,000.00 6,660.00
4 Semen Warna Zak 1.5000 67,000.00 100,500.00

II TENAGA
1 Pekerja Org/Hari 0.6000 80,000.00 48,000.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0450 150,000.00 6,750.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 242,417.60

30 1 M² Pasangan Batu Sisir 20 x 40 cm


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Batu Sisir 20 x 40 cm Dos 1.0000 110,000.00 110,000.00
2 Semen Pc 50 Kg Zak 0.1860 61,600.00 11,457.60
3 Pasir Pasang M³ 0.0180 370,000.00 6,660.00
4 Semen Warna Zak 1.5000 67,000.00 100,500.00

II TENAGA
1 Pekerja Org/Hari 0.6000 80,000.00 48,000.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0450 150,000.00 6,750.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 297,417.60

31 1 M1 Pasang plint keramik ukuran 10 x 40 cm


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Tegel Keramik 40 x 40 cm M2 0.2300 60,000.00 13,800.00
2 Semen Pc 50 Kg Zak 0.1860 61,600.00 11,457.60
3 Pasir Pasang M³ 0.0030 370,000.00 1,110.00
4 Semen Warna Zak 0.1000 67,000.00 6,700.00

II TENAGA
1 Pekerja Org/Hari 0.6000 80,000.00 48,000.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0450 150,000.00 6,750.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 101,867.60
32 1 M³ Pasangan Kusen Pintu dan Jendela (Kayu Kls II)
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Balok Kls. II M³ 1.1000 7,000,000.00 7,700,000.00

II TENAGA
1 Pekerja Org/Hari 6.0000 80,000.00 480,000.00
2 Tukang Kayu Org/Hari 20.0000 100,000.00 2,000,000.00
3 Kepala Tukang Org/Hari 2.0000 150,000.00 300,000.00
4 Mandor Org/Hari 0.3000 135,000.00 40,500.00

Jumlah 10,520,500.00
33 1 M² Pasangan Daun Pintu Panil (Kayu Kls II)

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Papan Kls. II M³ 0.0500 7,500,000.00 375,000.00

II TENAGA
1 Pekerja Org/Hari 1.2000 80,000.00 96,000.00
2 Tukang Kayu Org/Hari 2.5000 100,000.00 250,000.00
3 Kepala Tukang Org/Hari 0.3000 150,000.00 45,000.00
4 Mandor Org/Hari 0.0500 135,000.00 6,750.00

Jumlah 772,750.00
34 1 M² Pasangan Daun Pintu Taekwood, Seng Plat dan Rangka Kayu Kls. II
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Papan Kls. II M³ 0.0196 7,500,000.00 147,000.00
2 Seng Plat BJLS 0,25 mm Lbr 1.1100 65,000.00 72,150.00
3 Paku Tripleks Kg 0.0250 30,000.00 750.00
4 Taekwood 80 x 240 x 0,30 cm Lbr 1.0000 100,000.00 100,000.00

II TENAGA
1 Pekerja Org/Hari 0.6000 80,000.00 48,000.00
2 Tukang Kayu Org/Hari 2.0000 100,000.00 200,000.00
3 Kepala Tukang Org/Hari 0.2000 150,000.00 30,000.00
4 Mandor Org/Hari 0.0300 135,000.00 4,050.00

Jumlah 601,950.00

35 1 M² Pasangan Bingkai Jendela Kaca (Kayu Kls II)

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Papan Kls. II M³ 0.0112 7,500,000.00 84,000.00
2 Kaca Bening 5 mm M² 0.4000 118,000.00 47,200.00

II TENAGA
1 Pekerja Org/Hari 0.8000 80,000.00 64,000.00
2 Tukang Kayu Org/Hari 2.0000 100,000.00 200,000.00
3 Kepala Tukang Org/Hari 0.2000 150,000.00 30,000.00
4 Mandor Org/Hari 0.0400 135,000.00 5,400.00

Jumlah 430,600.00

36 1 M² Pasangan Jalusi Kusen (Kayu Kls II)


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Papan Kls. II M³ 0.0600 7,500,000.00 450,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.1500 30,000.00 4,500.00

II TENAGA
1 Pekerja Org/Hari 0.5000 80,000.00 40,000.00
2 Tukang Kayu Org/Hari 2.0000 100,000.00 200,000.00
3 Kepala Tukang Org/Hari 0.2000 150,000.00 30,000.00
4 Mandor Org/Hari 0.0250 135,000.00 3,375.00

Jumlah 727,875.00
37 1 M² Pasangan Kaca Mati 5 mm
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Kaca Bening 5 mm M² 1.1000 118,000.00 129,800.00
2 Kayu List 1 x 3 cm M¹ 3.2000 8,000.00 25,600.00
3 Paku Campuran 5, 7, 10, 12 cm Kg 0.0200 30,000.00 600.00

II TENAGA
1 Pekerja Org/Hari 0.0150 80,000.00 1,200.00
2 Tukang Kayu Org/Hari 0.1500 100,000.00 15,000.00
3 Kepala Tukang Org/Hari 0.0150 150,000.00 2,250.00
4 Mandor Org/Hari 0.0008 135,000.00 101.25

Jumlah 174,551.25
38 1 M³ Pasangan Konstruksi Kuda-kuda Kayu Kls. II

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Balok Kls. II M³ 1.1000 7,000,000.00 7,700,000.00
2 Besi strip kg 15.0000 12,000.00 180,000.00
3 Paku Campuran 5, 7, 10, 12 cm Kg 0.8000 30,000.00 24,000.00

II TENAGA
1 Pekerja Org/Hari 4.0000 80,000.00 320,000.00
2 Tukang Kayu Org/Hari 12.0000 100,000.00 1,200,000.00
3 Kepala Tukang Org/Hari 1.2000 150,000.00 180,000.00
4 Mandor Org/Hari 0.2000 135,000.00 27,000.00

Jumlah 9,631,000.00
39 1 M² Pasangan Kaso + reng genteng roof Kayu Kls. III

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Balok Kls. III M³ 0.0120 3,000,000.00 36,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.1500 30,000.00 4,500.00

II TENAGA
1 Pekerja Org/Hari 0.1000 80,000.00 8,000.00
2 Tukang Kayu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0050 135,000.00 675.00

Jumlah 60,675.00
40 1 M³ Pasangan Gording, Konsol, Balok Nok Kayu Kls. II
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Balok Kls. II M³ 1.1000 7,000,000.00 7,700,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.1500 30,000.00 4,500.00
II TENAGA
1 Pekerja Org/Hari 5.0000 80,000.00 400,000.00
2 Tukang Kayu Org/Hari 7.5000 100,000.00 750,000.00
3 Kepala Tukang Org/Hari 0.7500 150,000.00 112,500.00
4 Mandor Org/Hari 0.0250 135,000.00 3,375.00

Jumlah 8,970,375.00

41 1 M² Pasangan Rangka Plafond Kayu Kls. III

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Balok Kls. III M³ 0.0120 3,000,000.00 36,000.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.1000 30,000.00 3,000.00

II TENAGA
1 Pekerja Org/Hari 0.1500 80,000.00 12,000.00
2 Tukang Kayu Org/Hari 0.2500 100,000.00 25,000.00
3 Kepala Tukang Org/Hari 0.0250 150,000.00 3,750.00
4 Mandor Org/Hari 0.0750 135,000.00 10,125.00

Jumlah 89,875.00

42 1 M¹ Pasangan Listplank 2x3/20 cm Kayu Kls. II

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Papan Kls. III M³ 0.0145 3,500,000.00 50,750.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.0600 30,000.00 1,800.00

II TENAGA
1 Pekerja Org/Hari 0.1500 80,000.00 12,000.00
2 Tukang Kayu Org/Hari 0.2500 100,000.00 25,000.00
3 Kepala Tukang Org/Hari 0.0250 150,000.00 3,750.00
4 Mandor Org/Hari 0.0750 135,000.00 10,125.00

Jumlah 103,425.00
43 1 M¹ Pasangan Kalsi Plank l=30 cm, t = 0,8mm
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Kalsi Plank L=30 cm T=0,8 mm M1 1.1000 45,000.00 49,500.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.0600 30,000.00 1,800.00

II TENAGA
1 Pekerja Org/Hari 0.1500 80,000.00 12,000.00
2 Tukang Kayu Org/Hari 0.2500 100,000.00 25,000.00
3 Kepala Tukang Org/Hari 0.0250 150,000.00 3,750.00
4 Mandor Org/Hari 0.0750 135,000.00 10,125.00

Jumlah 102,175.00

44 1 M² Pasang Plafond tripleks 4mm


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Tripleks 4 mm Lbr 0.3500 65,000.00 22,750.00
2 Paku Tripleks Kg 0.0100 30,000.00 300.00

II TENAGA
1 Pekerja Org/Hari 0.0300 80,000.00 2,400.00
2 Tukang Kayu Org/Hari 0.0700 100,000.00 7,000.00
3 Kepala Tukang Org/Hari 0.0070 150,000.00 1,050.00
4 Mandor Org/Hari 0.0015 135,000.00 202.50

Jumlah 33,702.50

45 1 M¹ Pasangan List Plafond


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 List Plafond 3 x 3 cm M¹ 1.0500 8,000.00 8,400.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.0600 30,000.00 1,800.00
-
II TENAGA
1 Pekerja Org/Hari 0.0210 80,000.00 1,680.00
2 Tukang Kayu Org/Hari 0.0210 100,000.00 2,100.00
3 Kepala Tukang Org/Hari 0.0020 150,000.00 300.00
4 Mandor Org/Hari 0.0010 135,000.00 135.00

Jumlah 14,415.00
46 1 M² Pasangan Atap Spandeck ( Zincalume )
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Atap Spandek (Zincalume) Lbr 0.7500 135,000.00 101,250.00
2 Paku Seng Kg 0.0200 35,000.00 700.00

II TENAGA
1 Pekerja Org/Hari 0.1200 80,000.00 9,600.00
2 Tukang Kayu Org/Hari 0.0600 100,000.00 6,000.00
3 Kepala Tukang Org/Hari 0.0060 150,000.00 900.00
4 Mandor Org/Hari 0.0060 135,000.00 810.00

Jumlah 119,260.00

47 1 M² Pasangan Atap Seng Gelombang


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Seng Gelombang BJLS 0,25 mm Lbr 0.7000 65,000.00 45,500.00
2 Paku Seng Kg 0.0200 35,000.00 700.00

II TENAGA
1 Pekerja Org/Hari 0.1200 80,000.00 9,600.00
2 Tukang Kayu Org/Hari 0.0600 100,000.00 6,000.00
3 Kepala Tukang Org/Hari 0.0060 150,000.00 900.00
4 Mandor Org/Hari 0.0060 135,000.00 810.00

Jumlah 63,510.00
48 1 M² Pasangan Atap Genteng Metal roof ( 0,8 M X 0,77 M )
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Genteng Metal Roof Lbr 1.6200 40,000.00 64,800.00
2 Paku Seng Kg 0.0200 35,000.00 700.00

II TENAGA
1 Pekerja Org/Hari 0.1200 80,000.00 9,600.00
2 Tukang Kayu Org/Hari 0.0600 100,000.00 6,000.00
3 Kepala Tukang Org/Hari 0.0060 150,000.00 900.00
4 Mandor Org/Hari 0.0060 135,000.00 810.00

Jumlah 82,810.00

49 1 M² Pasangan Nok Atap Seng Plat

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Seng Plat BJLS 0,20 mm Lbr 0.7000 60,000.00 42,000.00
2 Paku Seng Kg 0.0400 35,000.00 1,400.00

II TENAGA
1 Pekerja Org/Hari 0.1500 80,000.00 12,000.00
2 Tukang Kayu Org/Hari 0.0700 100,000.00 7,000.00
3 Kepala Tukang Org/Hari 0.0080 150,000.00 1,200.00
4 Mandor Org/Hari 0.0060 135,000.00 810.00

Jumlah 64,410.00

50 1 M¹ Pasangan Nok Atap Genteng Metal roof 1,10 M


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Nok genteng Metal roof Lbr 0.7000 50,000.00 35,000.00
2 Paku Genteng Roof Kg 0.0400 45,000.00 1,800.00

II TENAGA
1 Pekerja Org/Hari 0.1500 80,000.00 12,000.00
2 Tukang Kayu Org/Hari 0.0700 100,000.00 7,000.00
3 Kepala Tukang Org/Hari 0.0080 150,000.00 1,200.00
4 Mandor Org/Hari 0.0060 135,000.00 810.00

Jumlah 57,810.00
51 1 M² Pengecatan Kayu
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Cat Meni Kg 0.2000 35,000.00 7,000.00
2 Plamur Kg 0.1500 15,000.00 2,250.00
3 Minyak Cat Afdunner Ltr 0.1700 15,000.00 2,550.00
4 Cat Kayu Avian Kg 0.3500 50,000.00 17,500.00

II TENAGA
1 Pekerja Org/Hari 0.0700 80,000.00 5,600.00
2 Tukang Cat Org/Hari 0.0400 100,000.00 4,000.00
3 Kepala Tukang Org/Hari 0.0040 150,000.00 600.00
4 Mandor Org/Hari 0.0025 135,000.00 337.50

Jumlah 39,837.50

52 1 M² Pengecatan Pernis Kayu

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Vernis Ltr 0.1500 45,000.00 6,750.00
2 Dempul Kg 0.0500 10,000.00 500.00
3 Amplas/Kertas Gosok Lbr 0.1000 7,000.00 700.00
4 Kuas Cat Bh 0.0100 14,000.00 140.00

II TENAGA
1 Pekerja Org/Hari 0.1600 80,000.00 12,800.00
2 Tukang Cat Org/Hari 0.1600 100,000.00 16,000.00
3 Kepala Tukang Org/Hari 0.0160 150,000.00 2,400.00
4 Mandor Org/Hari 0.0025 135,000.00 337.50

Jumlah 39,627.50

53 1 M² Pengecatan Tembok
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Plamur Kg 0.1000 15,000.00 1,500.00
2 Cat Dasar Aries 20 Kg Kg 0.1000 35,000.00 3,500.00
3 Cat Tembok Kg 0.2600 30,000.00 7,800.00

II TENAGA
1 Pekerja Org/Hari 0.0200 80,000.00 1,600.00
2 Tukang Cat Org/Hari 0.0630 100,000.00 6,300.00
3 Kepala Tukang Org/Hari 0.0063 150,000.00 945.00
4 Mandor Org/Hari 0.0025 135,000.00 337.50

Jumlah 21,982.50
54 1 M² Pelaburan Bidang Kayu Dengan Residu
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Residu/Colter Kg 0.3500 25,000.00 8,750.00
2 Kuas Cat Bh 0.0100 14,000.00 140.00

II TENAGA
1 Pekerja Org/Hari 0.1000 80,000.00 8,000.00
2 Mandor Org/Hari 0.0060 135,000.00 810.00

Jumlah 17,700.00

55 1 M² Pengecatan Permukaan Atap seng


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Cat Seng Kg 0.1000 40,000.00 4,000.00
2 Kuas Cat Bh 0.0100 14,000.00 140.00

II TENAGA
1 Pekerja Org/Hari 0.0200 80,000.00 1,600.00
2 Tukang Cat Org/Hari 0.2000 100,000.00 20,000.00
3 Kepala Tukang Org/Hari 0.0200 150,000.00 3,000.00
4 Mandor Org/Hari 0.0100 135,000.00 1,350.00

Jumlah 30,090.00

56 1 Bh Pasangan Kunci Tanam

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Kunci Tanam 2 Slag Cavel Bh 1.0000 120,000.00 120,000.00

II TENAGA
1 Pekerja Org/Hari 0.0100 80,000.00 800.00
2 Tukang Kayu Org/Hari 0.5000 100,000.00 50,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0050 135,000.00 675.00

Jumlah 172,975.00
57 1 Bh Pasangan Kunci Tanam Untuk KM/WC
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Pas. Kunci Tanam 1 Slag Bh 1.0000 100,000.00 100,000.00

II TENAGA
1 Pekerja Org/Hari 0.0050 80,000.00 400.00
2 Tukang Kayu Org/Hari 0.5000 100,000.00 50,000.00
3 Kepala Tukang Org/Hari 0.0050 150,000.00 750.00
4 Mandor Org/Hari 0.0025 135,000.00 337.50

Jumlah 151,487.50

58 1 Psg Pasangan Engsel Pintu

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Engsel Pintu SES Psg 1.0000 25,000.00 25,000.00

II TENAGA
1 Pekerja Org/Hari 0.0150 80,000.00 1,200.00
2 Tukang Kayu Org/Hari 0.1500 100,000.00 15,000.00
3 Kepala Tukang Org/Hari 0.0150 150,000.00 2,250.00
4 Mandor Org/Hari 0.0008 135,000.00 101.25

Jumlah 43,551.25

59 1 Psg Pasangan Engsel Jendela

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Engsel Jendela 777 Psg 1.0000 18,000.00 18,000.00

II TENAGA
1 Pekerja Org/Hari 0.0100 80,000.00 800.00
2 Tukang Kayu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0005 135,000.00 67.50

Jumlah 30,367.50
60 1 Psg Pasangan Hak Angin
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Hak Angin Psg 1.0000 20,000.00 20,000.00

II TENAGA
1 Pekerja Org/Hari 0.0150 80,000.00 1,200.00
2 Tukang Kayu Org/Hari 0.1500 100,000.00 15,000.00
3 Kepala Tukang Org/Hari 0.0150 150,000.00 2,250.00
4 Mandor Org/Hari 0.0008 135,000.00 101.25

Jumlah 38,551.25

61 1 Psg Pasangan Espanyolet

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Espanyolet Psg 1.0000 48,000.00 48,000.00

II TENAGA
1 Pekerja Org/Hari 0.0150 80,000.00 1,200.00
2 Tukang Kayu Org/Hari 0.1500 100,000.00 15,000.00
3 Kepala Tukang Org/Hari 0.0150 150,000.00 2,250.00
4 Mandor Org/Hari 0.0008 135,000.00 101.25

Jumlah 66,551.25

62 1 Psg Pasangan Grendel Pintu


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Grendel Pintu Bh 1.0000 10,000.00 10,000.00

II TENAGA
1 Pekerja Org/Hari 0.0050 80,000.00 400.00
2 Tukang Kayu Org/Hari 0.5000 100,000.00 50,000.00
3 Kepala Tukang Org/Hari 0.0050 150,000.00 750.00
4 Mandor Org/Hari 0.0025 135,000.00 337.50

Jumlah 61,487.50
63 1 Psg Pasangan Grendel Jendela
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Grendel Jendela Bh 1.0000 10,000.00 10,000.00

II TENAGA
1 Pekerja Org/Hari 0.0050 80,000.00 400.00
2 Tukang Kayu Org/Hari 0.5000 100,000.00 50,000.00
3 Kepala Tukang Org/Hari 0.0050 150,000.00 750.00
4 Mandor Org/Hari 0.0025 135,000.00 337.50

Jumlah 61,487.50

64 1 Bh Pasang Kloset Jongkok


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Kloset Jongkok Bh 1.0000 250,000.00 250,000.00
2 Semen Pc 50 Kg Zak 0.1200 61,600.00 7,392.00
3 Pasir Pasang M³ 0.0100 370,000.00 3,700.00

II TENAGA
1 Pekerja Org/Hari 1.0000 80,000.00 80,000.00
2 Tukang Batu Org/Hari 1.5000 100,000.00 150,000.00
3 Kepala Tukang Org/Hari 1.5000 150,000.00 225,000.00
4 Mandor Org/Hari 0.1600 135,000.00 21,600.00

Jumlah 737,692.00

65 1 Bh Pasang Kloset Duduk


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Kloset Duduk Set 1.0000 1,600,000.00 1,600,000.00
2 Perlengkapan 6% Harga Kloset ls 1.0000 96,000.00 96,000.00

II TENAGA
1 Pekerja Org/Hari 3.3000 80,000.00 264,000.00
2 Tukang Batu Org/Hari 1.1000 100,000.00 110,000.00
3 Kepala Tukang Org/Hari 0.0010 150,000.00 150.00
4 Mandor Org/Hari 0.1600 135,000.00 21,600.00

Jumlah 2,091,750.00
66 1 Bh Pasang Urinoir
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Urinoir Bh 1.0000 600,000.00 600,000.00
2 Perlengkapan 30% Harga Urinoir Ls 1.0000 180,000.00 180,000.00
3 Semen Pc 50 Kg Zak 0.1200 61,600.00 7,392.00
4 Pasir Pasang M³ 0.0100 370,000.00 3,700.00

II TENAGA
1 Pekerja Org/Hari 1.0000 80,000.00 80,000.00
2 Tukang Batu Org/Hari 1.0000 100,000.00 100,000.00
3 Kepala Tukang Org/Hari 0.1000 150,000.00 15,000.00
4 Mandor Org/Hari 0.1000 135,000.00 13,500.00

Jumlah 999,592.00

67 1 Bh Pasang Washtafel

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Washtafel Bh 1.0000 500,000.00 500,000.00
2 Perlengkapan 12% Harga Washtafel Ls 1.0000 60,000.00 60,000.00
3 Semen Warna Zak 0.1200 67,000.00 8,040.00
4 Pasir Pasang M³ 0.0100 370,000.00 3,700.00

II TENAGA
1 Pekerja Org/Hari 1.2000 80,000.00 96,000.00
2 Tukang Batu Org/Hari 1.4500 100,000.00 145,000.00
3 Kepala Tukang Org/Hari 0.1500 150,000.00 22,500.00
4 Mandor Org/Hari 0.1000 135,000.00 13,500.00

Jumlah 848,740.00

68 1 Bh Pasang Bak Fibreglass


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Bak Mandi Fiberglass Bh 1.0000 300,000.00 300,000.00
2 Perlengkapan 18% Harga Fiberglass Ls 1.0000 54,000.00 54,000.00

II TENAGA
1 Pekerja Org/Hari 1.5000 80,000.00 120,000.00
2 Tukang Batu Org/Hari 2.2000 100,000.00 220,000.00
3 Kepala Tukang Org/Hari 0.4400 150,000.00 66,000.00
4 Mandor Org/Hari 0.1100 135,000.00 14,850.00

Jumlah 774,850.00
69 1 Bh Pasang Kitchenzink
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Kitchenzink Bh 1.0000 400,000.00 400,000.00
2 Water Drain + Accessoris Ls 1.0000 140,000.00 140,000.00

II TENAGA
1 Pekerja Org/Hari 0.0300 80,000.00 2,400.00
2 Tukang Batu Org/Hari 0.3000 100,000.00 30,000.00
3 Kepala Tukang Org/Hari 0.0300 150,000.00 4,500.00
4 Mandor Org/Hari 0.0015 135,000.00 202.50

Jumlah 577,102.50

70 1 Bh Pasang Floor Drain

No. : Uraian Satuan Kuantitas Harga Satuan Jumlah


(Rp.) (Rp.)

I BAHAN
1 Floor Drain Bh 1.0000 35,000.00 35,000.00

II TENAGA
1 Pekerja Org/Hari 0.0100 80,000.00 800.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0050 135,000.00 675.00

Jumlah 47,975.00

71 1 Bh Kran Air Ø ¾"


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Pipa Galvanis Ø ¾" M¹ 1.2000 30,000.00 36,000.00
2 Seal Tape Bh 0.0250 5,500.00 137.50

II TENAGA
1 Pekerja Org/Hari 0.0100 80,000.00 800.00
2 Tukang Batu Org/Hari 0.1000 100,000.00 10,000.00
3 Kepala Tukang Org/Hari 0.0100 150,000.00 1,500.00
4 Mandor Org/Hari 0.0050 135,000.00 675.00

Jumlah 49,112.50
72 1 M¹ Pipa Galvanis Ø ¾"
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Pipa Galvanis Ø ¾" M¹ 1.2000 30,000.00 36,000.00
2 Perlengkapan 35% Harga Pipa Ls 1.0000 10,500.00 10,500.00

II TENAGA
1 Pekerja Org/Hari 0.0540 80,000.00 4,320.00
2 Tukang Batu Org/Hari 0.0900 100,000.00 9,000.00
3 Kepala Tukang Org/Hari 0.0090 150,000.00 1,350.00
4 Mandor Org/Hari 0.0270 135,000.00 3,645.00

Jumlah 64,815.00
73 1 M¹ Pipa PVC Ø ¾"
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Pipa PVC Ø ¾" M¹ 1.2000 9,000.00 10,800.00
2 Perlengkapan 35% Harga Pipa Ls 1.0000 3,150.00 3,150.00

II TENAGA
1 Pekerja Org/Hari 0.0360 80,000.00 2,880.00
2 Tukang Batu Org/Hari 0.0600 100,000.00 6,000.00
3 Kepala Tukang Org/Hari 0.0060 150,000.00 900.00
4 Mandor Org/Hari 0.0018 135,000.00 243.00

Jumlah 23,973.00

74 1 M¹ Pipa PVC Ø 4"


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

I BAHAN
1 Pipa PVC Ø 4" M¹ 1.1000 60,000.00 66,000.00
2 Perlengkapan 35% Harga Pipa Ls 1.0000 9,000.00 9,000.00

II TENAGA
1 Pekerja Org/Hari 0.0810 80,000.00 6,480.00
2 Tukang Batu Org/Hari 0.1350 100,000.00 13,500.00
3 Kepala Tukang Org/Hari 0.0135 150,000.00 2,025.00
4 Mandor Org/Hari 0.0041 135,000.00 553.50

Jumlah 97,558.50
75 1 M¹ Talang Miring Seng BJLS 0,30
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN
1 Seng Plat BJLS 0,25 mm Lbr 0.5000 65,000.00 32,500.00
2 Paku Campuran 5, 7, 10, 12 cm Kg 0.0150 30,000.00 450.00
3 Papan Kls. II M³ 0.0190 7,500,000.00 142,500.00
4 Cat Meni Kg 0.3000 35,000.00 10,500.00

II TENAGA
1 Pekerja Org/Hari 0.0810 80,000.00 6,480.00
2 Tukang Batu Org/Hari 0.1350 100,000.00 13,500.00
3 Kepala Tukang Org/Hari 0.0135 150,000.00 2,025.00
4 Mandor Org/Hari 0.0041 135,000.00 553.50

Jumlah 208,508.50
76 1 M¹ Saluran/Riol Keliling Bangunan
Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas
(Rp.) (Rp.)

I BAHAN

1 Pek. Galian Tanah M³ 0.0550 46,750.00 2,571.25


2 Pek. Urugan Kembali M³ 0.0138 17,952.00 246.84
3 Pek. Dinding Batu Bata 1 : 2 Kg 0.5000 144,681.40 72,340.70
4 Pek. Batu Kosong M³ 0.0500 612,015.00 30,600.75
5 Pek. Pasir Urug M³ 0.0230 367,350.00 8,449.05
6 Pek. Beton Rabat M³ 0.0350 945,726.00 33,100.41

Jumlah 147,309.00

77 1 M² Pembersihan Sisa Bangunan


Harga Satuan Jumlah
No. : Uraian Satuan Kuantitas (Rp.) (Rp.)

1 Pekerja Org/Hari 0.1000 80,000.00 8,000.00


2 Mandor Org/Hari 0.0500 135,000.00 6,750.00

Jumlah 14,750.00

Rantepao, Juli 2013


KONSULTAN PERENCANA
CV. MAHAPANI KONSULTAN

Ir. MUH. NASRUN


DIREKTUR
DAFTAR HARGA SATUAN
BAHAN DAN UPAH TAHUN 2013
A. DAFTAR HARGA SATUAN BAHAN

NO. JENIS BAHAN BANGUNAN SATUAN HARGA (Rp.)

1 Semen Pc 50 Kg (Tonasa) Zak 61,600.00


2 Semen PC 50 Kg (Bosowa/Tiga Roda) Zak 60,000.00
3 Semen Warna Zak 67,000.00
4 Pasir Beton M³ 370,000.00
5 Pasir Pasang M³ 370,000.00
6 Pasir Urug/Timbunan M³ 285,000.00
7 Tanah Timbunan M³ 135,000.00
8 Sirtu/Kerikil/Koral M³ 360,000.00
9 Batu Pecah (1 - 2 cm) M³ 380,000.00
10 Batu Pecah (2 - 3 cm) M³ 380,000.00
11 Batu Pecah (3 - 5 cm) M³ 370,000.00
12 Kapur Pasang (5 Kg) Zak 7,500.00
13 Batu Gunung/Batu Kali M³ 345,000.00
14 Batu Bata Standar (Kls. I) Biji 1,000.00
15 Kawat Beton (1 Roll =25 Kg) kg 17,500.00
16 Kawat Pengikat kg 18,000.00
17 Besi Beton Polos SNI kg 15,500.00
18 Besi strip 1½ x 4⅓ panjang 4 m kg 12,000.00
19 Tegel Keramik 40 x 40 cm Dos 60,000.00
20 Tegel Keramik 20 x 25 cm Dos 58,000.00
21 Tegel Keramik 20 x 20 cm Dos 55,000.00
22 Tegel Keramik Polos 30 x 30 cm Dos 55,000.00
Tegel Keramik Polos 60 x 60 cm Dos 115,000.00
Batu Sisir 20 x 40 cm Dos 110,000.00
23 Balok Kls. I Bayam M³ 12,000,000.00
24 Papan Kls. I M³ 15,000,000.00
25 Balok Kls. II Lokal M³ 7,000,000.00
26 Papan Kls. II Lokal M³ 7,500,000.00
27 Balok Kls. III Lokal M³ 3,000,000.00
28 Papan Kls. III Lokal M³ 3,500,000.00
29 Balok Kls. IV Lokal M³ 2,000,000.00
30 Papan Kls. IV Lokal M³ 2,000,000.00
31 Kayu List 1 x 3 cm M¹ 8,000.00
32 List Plafond 3 x 3 cm M¹ 8,000.00
33 Paku Campuran 5, 7, 10, 12 cm Kg 30,000.00
34 Paku Seng Kg 35,000.00
35 Paku Tripleks Kg 30,000.00
36 Paku Genteng Roof Kg 45,000.00
37 Seng Gelombang BJLS 0,35 mm Lbr 83,000.00
38 Seng Gelombang BJLS 0,25 mm Lbr 65,000.00
39 Seng Gelombang BJLS 0,25 mm Lbr 65,000.00
40 Seng Gelombang BJLS 0,20 mm Lbr 52,000.00
41 Genteng Metal Roof Lbr 40,000.00
42 Nok genteng Metal roof Lbr 50,000.00
43 Seng Plat BJLS 0,35 mm Lbr 78,000.00
44 Seng Plat BJLS 0,25 mm Lbr 65,000.00
45 Seng Plat BJLS 0,20 mm Lbr 60,000.00
46 Taekwood 80 x 240 x 0,30 cm Lbr 100,000.00
47 Tripleks 4 mm Lbr 65,000.00
48 Atap Spandek (Zincalume) lbr 135,000.00
49 Kalsi Plank L=30 cm T=0,8 mm M1 45,000.00
48 Tripleks 3 mm Lbr 50,000.00
49 Plywood 9 mm Lbr 130,000.00
50 Kaca Bening 5 mm M² 118,000.00
51 Kaca Bening 3 mm M² 100,000.00
52 Kaca Rayben 5 mm M² 115,000.00
53 Kaca Rayben 3 mm M² 99,000.00
54 Kunci Tanam 1 Slag Union Bh 100,000.00
55 Kunci Tanam 2 Slag Cavel Bh 120,000.00
56 Engsel Pintu SES Psg 25,000.00
57 Engsel Jendela Biasa Psg 18,000.00
58 Engsel Jendela 777 Psg 18,000.00
59 Grendel Pintu Bh 10,000.00
60 Grendel Jendela Bh 10,000.00
61 Espanyolet Psg 48,000.00
62 Hak Angin Psg 20,000.00
63 Kuas Cat Bh 14,000.00
64 Cat Meni Kg 35,000.00
65 Cat Kayu Avian Kg 50,000.00
66 Cat Seng Kg 40,000.00
67 Cat Tembok Kg 30,000.00
68 Cat Dasar Aries 20 Kg Kg 35,000.00
69 Plamur Kg 15,000.00
70 Residu/Colter Kg 25,000.00
71 Dempul Kg 10,000.00
72 Amplas/Kertas Gosok Lbr 7,000.00
73 Vernis Ltr 45,000.00
74 Minyak Cat Afdunner Ltr 15,000.00
75 Lampu Neon Kapsul 5 watt dan Upah Bh 55,000.00
76 Lampu Neon Kapsul 18 watt dan Upah Bh 57,000.00
77 Sakelar Phase Ganda dan Upah Pasang Bh 45,000.00
78 Sakelar Phase Tunggal dan Upah Pasang Bh 43,000.00
79 Stop Kontak dan Upah Pasang Bh 48,000.00
80 Sekring Box 2 Group (MCB) Bh 780,000.00
81 Pipa PVC Ø 5/8" dan Upah Pasang M¹ 8,000.00
82 Kabel Tunggal NYY 2 x 2,50 M 15,000.00
83 Kabel Tunggal NYY 3 x 2,50 M 20,000.00
84 Fitting dan Upah Pasang Bh 18,000.00
85 Kran Air Ø ¾ " Bh 25,000.00
86 Pipa Galvanis Ø ¾" M¹ 30,000.00
87 Pipa PVC Ø ¾" M¹ 9,000.00
88 Pipa PVC Ø 4" M¹ 60,000.00
89 Seal Tape Bh 5,500.00
90 Kloset Jongkok Bh 250,000.00
91 Kloset Duduk Set 1,600,000.00
92 Urinoir Bh 600,000.00
93 Washtafel Bh 500,000.00
94 Bak Mandi Fiberglass Bh 300,000.00
95 Bak Reservoir Fiberglass Bh 1,500,000.00
96 Kitchenzink Bh 400,000.00
97 Floor Drain Bh 35,000.00
98 Minyak Bekisting Ltr 18,000.00
99 Dolken Ø 8 cm - 4 m Btg 20,500.00
100 Pipa PVC 1/2 " AW Btg 20,000.00
101 Pipa PVC 3/4 " AW Btg 30,000.00
102 Pipa PVC 2 " AW Btg 75,000.00
103 Pipa PVC 3 " AW Btg 148,000.00
104 Pipa PVC 4 " AW Btg 235,000.00
B. DAFTAR UPAH PEKERJAAN

NO. URAIAN SATUAN HARGA (Rp.)

1 Pekerja Org/Hari 80,000.00


2 Tukang Kayu Org/Hari 100,000.00
3 Tukang Batu Org/Hari 100,000.00
4 Tukang Cat Org/Hari 100,000.00
5 Tukang Besi Org/Hari 100,000.00
6 Tukang Listrik Org/Hari 100,000.00
7 Tukang Pipa Org/Hari 100,000.00
8 Kepala Tukang Org/Hari 150,000.00
9 Mandor Org/Hari 135,000.00

Rantepao, Juli 2013

KONSULTAN PERENCANA
CV. MAHAPANI KONSULTAN

Ir. MUH. NASRUN


DIREKTUR
Formulir Penentuan Harga Bahan
Bahan : Semen

No Uraian Kegiatan Biaya Jumlah Kombinasi


Rp/satuan Jumlah (Rp) (Rp)

1 Harga di Rantepao Rp/ton 1,160,000.00 1,160,000.00

2 Handling - - -

3 Transport ke proyek Rp/ton 72,000.00 72,000.00

4 Pembongkaran, gudang Rp/ton 0.00

5 Waste 5% Rp/ton 0.00

subtotal Rp/ton 1,232,000.00

6 Keuntungan & Overhead Rp/ton


5 % (hanya utk pekerjaan
harian)

total jumlah Rp/ton 1,232,000.00


Rp/zak 61,600.00

7 Harga Netto Rp/zak Harga Semen/Zak (50 kg)


8 Harga setelah ditambah Rp/zak 61,600.00 Ongkos Angkut untuk 50 Zak
Ongkos Angkut untuk 1 Zak
Harga Semen/Zak (50 kg) + Ongkos Angkut

Bahan : Aspal

No Uraian Kegiatan Biaya Jumlah Kombinasi


Rp/satuan Jumlah (Rp) (Rp)

1 Harga di Lokasi Rp/ton 10,000,000.00 10,000,000.00

2 Handling Rp/ton

3 Transport ke proyek Rp/ton 0.00

4 Pembongkaran, gudang Rp/ton

5 Waste 2% Rp/ton

subtotal Rp/ton 10,000,000.00

6 Keuntungan & Overhead Rp/ton


5 % (hanya utk pekerjaan
harian) Harga aspal
Transport
total jumlah Rp/ton 10,000,000.00
Rp/kg 10,000.00

7 Harga Netto Rp/kg


8 Harga setelah ditambah Rp/kg 10,000.00

P1 L T JLH VOLUME
L T J
2.41 2.83 1.00 6.82 M2
P2
0.90 2.15 3.00 5.81 M2
P3
1.00 2.3 2.00 4.60 M2

PJ1 M2
0.90 2.15 2.00 3.87
0.52 1.55 1.61
5.48 M2

J1
2.43 2.23 2.00 10.8378 M2
M2
J2
0.52 1.42 1.00 0.7384 M2
57.5
J3
0.60 0.50 4.00 1.2 M2

LOKET M2
0
V
0
JALUSI SEGITIA
1.50 2.99 TOTAL
TOTAL LUAS PAS. KUSEN P/J 43.96 0.595296
LUAS PAS. BATU MERAH 230.00 0.44064
TOTAL LUAS PAS. BATU MERAH (LUAS PAS. BT - LUAS P/J) 186.04 0.139968
0.549936 m3
1.7208
0.0432
3.48984
KUDA KD2 T L P J
Kaki 0.06 0.12 13.78 6 TOTAL
Balok Tarik 0.06 0.12 10.2 6 0.099648
Tiang Raja 0.06 0.12 3.24 6 0.03096
Balok Skor vertikal 0.06 0.12 12.73 6 0.021888
Balok Skor Horisontal 0.06 0.12 47.8 5 0.05184 m3
Balok Jepit Tiang Raja 0.06 0.12 1 6 0.0864
0.0072 m3
0.297936
KUDA KD1 T L P J
Kaki 0.06 0.12 6.92 2 3.787776
Balok Tarik 0.06 0.12 4.3 1
Tiang Raja 0.06 0.12 1.52 2 TOTAL m3
Balok Skor vertikal 0.06 0.12 3.6 2 1.36
Balok Skor Horisontal 0.06 0.12 6 2 0.10425
Balok Jepit Tiang Raja 0.06 0.12 1 1 1.46425

TOTAL m3
Jumlah Kuda2 5/10 0.392
0.04235 m3
Gording KD2 T L P J 0.43435
Gording 0.05 0.1 17 16
Balok Nok 0.05 0.1 20.85 1 1.8986

bh pintu
Gording KD1 T L P J
Gording 0.05 0.1 4.9 16
Balok Nok 0.05 0.1 8.47 1 total
0.0375 2 0.126
0.003
Jumlah Gording 5/10 0.0225
0.063 bh pintu

Kusen Pintu/Jendelah total 12 0.63


P1 t l p jumlah 0.0375
Ver 0.05 0.15 2.5 2 0.015
Ver 0.05 0.15 0.4 1 0.0525 bh pintu
Horisontal 0.05 0.15 1.5 2

total 2 0.0765
0.03225
P2 t l p jumlah 0.006
Ver 0.05 0.15 2.5 2 0.03825 bh pintu
Horisontal 0.05 0.15 1 2
total 16 1.0404
0.03465
P3 t l p jumlah 0.030375
Ver 0.05 0.15 2.15 2 0.065025 bh pintu
Horisontal 0.05 0.15 0.8 1

total 2 0.0981
0.0315
Jendelah J1 t l p jumlah 0.01755
Ver 0.05 0.15 1.54 3 0.04905 bh pintu
Horisontal 0.05 0.15 1.35 3

total 1 0.03675
0.01425
Jendelah J2 t l p jumlah 0.0225
Ver 0.05 0.15 2.1 2 0.03675
Horisontal 0.05 0.15 0.78 3 bh pintu

total 2 0.033
loket t l p jumlah 0.0075 0.132
Ver 0.05 0.15 0.95 2 0.009
Horisontal 0.05 0.15 1 3 0.0165 2.17275
0.033

Ventilasi t l p jumlah
Ver 0.05 0.15 0.5 2
Horisontal 0.05 0.15 0.6 2
M2
0.0075 4.4
M2
TOTAL VOL.
KUSEN
PINTU/JENDELA
M2

Pintu Panel M2
P1 L T JUMLAH L.KACA LUAS BINGKAI
1.42 2.11 2 5.9924 0.1704 0.4184
0.0678 0.2522
P2 0.92 2.11 12 23.2944 0.2382 0.6706
M2
P3 0.72 2.11 2 3.0384 M2 1.008 2.5248

32.3252 L.KACA LUAS BINGKAI


M2 6.1152 4.896
6.1152 4.896
Binkai jendela 12.2304 9.792
P1 L T JUMLAH M2
0.92 0.32 2 0.5888 M2 0.8064 2.368
0.5 0.32 2 0.32 0.8064 2.368
1.6128 4.736
M2
P2 0.92 0.32 12 3.5328 M2 14.528

JENDELAH J1 L T JUMLAH L.KACA LUAS BINGKAI


0.62 1.11 16 11.0112
LUAS BINGKAI J2 0.4544 0.0064
0.62 1.11 16 11.0112 2.244
2.6984 0.0064
M2
0.62 0.32 16 3.1744
0.62 0.32 16 3.1744
0.54

0.54

JENDELAH J2 L T JUMLAH
0.72 0.32 2 0.4608 L.KACA LUAS BINGKAI
0.52

0
M2
17.7298
18.8478

1.375
1.08625

VENTILASI L T JUMLAH 2.46125

TOTAL LUAS BINGKAI JENDELAH


TOTAL LUAS KACA
Kg Ton
58,000 1,160 1,160,000
180,000
3,600 72 72,000
61,600 1,232 1,232,000

59,000.00

571,275,000.00
756,000,000.00

Kg Ton
10,000 10,000,000
300000 150 150,000
- -
- -

2500
m3

m3

m3
m3

m3

m3

m3

m3

M2

M2

M2

M2

M2

M2

M2
M2
M2
PJG GALIAN V 31.75
H 32.5
64.25 M1

Galian 33.73125 m3

Urugan Pasir Bwh Pondasi 2.24875


Urugan Pasir Bwh LT 5.341
7.58975 m3 Timbunan Tanah
11.26
Batu Kosong 8.995 m3 4.76
12.26
Batu Gunung 17.3475 m3 5.26
11.46
Pek. Sloef Beton 1.9275 m3 8.76
3.38
kolom k1 2.07 m3 1.7
11.88
kolom k2 0.72 m3 6.18
11.38
Pek. Ring balk + konsol 1.9275 m3 8.88
tiang tenga utama 0.18 m3 9.66
blk segitiga m3 Total 106.82
tiang tenga teras m3
blk segitiga teras m3
total 2.1075 m3
51.40 3,598 2,518,600

3 210
7 490
4,298 3,223,500

756,000,000.00 pagu
571,275,000.00 rekap

184,725,000.00 selisi
JADWAL WAKTU PELAKSANAAN
KEGIATAN : PERENCANAAN REHABILITASI BERAT PUSKESMAS PERAWATAN
LOKASI : PUSKESMAS TIKALA
TAHUN : 2013

NILAI NILAI WAKTU PELAKSANAAN NILAI


NO. URAIAN PEKERJAAN BOBOT BOBOT BULAN I BULAN II BULAN III BULAN IV KURVA KET.
(Rp) (%) I II III IV I II III IV I II III IV I II (%)
A PEKERJAAN PERSIAPAN 4,259,800.00 - - - 100%
B PEKERJAAN TANAH DAN PASIR 4,064,447.32 - - - -
C PEKERJAAN BATU, BETON, PLESTERAN DAN ACIAN 94,169,373.43 - - - - - - - - 75%
D PEKERJAAN KERAMIK 14,378,074.35 - - - -
E PEKERJAAN KUDA-KUDA, ATAP DAN PLAFOND 63,125,412.50 - - - - - - - - 50%
F PEKERJAAN KUSEN, PINTU, JENDELA DAN PENGUNCI 21,824,361.19 - - - - - - -
G PEKERJAAN PENGECATAN 11,931,528.03 - - - - - - -
H PEKERJAAN INSTALASI LISTRIK 3,310,000.00 ### ### ### ### ### ### ### ###
I PEKERJAAN KAMAR MANDI/WC 12,875,694.84 ### ### ### ### ### ### ###
J PEKERJAAN AKHIR 387,500.00 - - - - -
RENCANA KEMAJUAN PEKERJAAN 230,326,191.66 ### 0.00 0.00 0.00 0.00 0.00 ### ### ### ### ### ### ### ### 0.00
KOMULATIF KEMAJUAN RENCANA PEKERJAAN 0.00 0.00 0.00 0.00 0.00 ### ### ### ### ### ### ### ### ###
REALISASI
KOMULATIF KEMAJUAN PEKERJAAN

Rantepao, Juli 2013

KONSULTAN PERENCANA
CV. MAHAPANI KONSULTAN

Ir. MUH. NASRUN


DIREKTUR
CV. DAYUDA MANDIRI
Jln.Telp.
Mariri, Lembang
(0423) Saloso
27214, Hp.Kecamatan Rantepao
085255115599

Toraja Utara, 30 Juli 2011


Nomor : 012/CV-DM/VIII/2011
Lampiran : 1 (Satu) Berkas
Kepada Yth,
Panitia Pengadaan Barang/Jasa Pembangunan Kantor BPP Tahun2011
di -
Rantepao

Perihal : Penawaran Pekerjaan Pembangunan Gedung Kantor BPP


Kecamatan Bangkelekila

Sehubungan dengan Pengumuman pendaftaran dan pengambilan Dokumen Pengadaan


nomor : 04/PPBJ-BKPP/VII/2011 tanggal 19 Juli 2011 dan setelah kami pelajari dengan
seksama Dokumen Pengadaan dan Berita Acara Pemberian Penjelasan dan addendumnya, dengan
ini kami mengajukan penawaran untuk pekerjaan Pembangunan Gedung Kantor BPP
Kecamatan Bangkelekila sebesar Rp. 338.417.000,- (Tiga Ratus Tiga Puluh Delapan Juta
Empat Ratus Tujuh Belas Ribu Rupiah).-

Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam
Dokumen Pengadaan untuk melaksanakan pekerjaan tersebut di atas.

Kami akan melaksanakan pekerjaan tersebut dengan Jangka waktu pelaksanaan


pekerjaan selama 100 (seratus) hari kalender.

Penawaran ini berlaku selama 60 ( enam puluh ) hari kalender sejak tanggal surat
penawaran ini.

Sesuai dengan persyaratan, bersama Surat Penawaran ini kami lampirkan :


1. Jaminan Penawaran (asli);
2. Daftar Kuantitas dan Harga;
3. Dokumen penawaran teknis, terdiri dari :
a. Metode Pelaksanaan;
b. Jadual Waktu Pelaksanaan;
c. Daftar Personil Inti;

d. Jenis, kapasitas, komposisi, dan jumlah peralatan utama minimal yang dibutuhkan
5. Lampiran lain yang disyaratkan;

Surat penawaran beserta lampirannya kami sampaikan sebanyak 2 (dua) rangkap yang
terdiri dari dokumen asli I (satu) rangkap dan salinannya I (satu) rangkap serta ditandai " Asli"
dan "Rekaman".

Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan
tunduk pada semua ketentuan yang tercantum dalam Dokumen Pengadaan.

KONSULTAN PERENCANA
CV. MAHAPANI KONSULTAN

Ir. MUH. NASRUN


DIREKTUR
METODA PELAKSANAAN
I. PEKERJAAN PERSIAPAN
1. Mobilisasi dan demobilisasi Alat
Mobilisasi alat akan dilaksanakan pada awal pekerjaan agar dapat digunakan untuk melaksanakan p
pendukung seperti penyiapan jalan logistik dan atau pekerjaan lain yang diperuntukkan untuk memu
pekerjaan utama.

Agar penggunaan alat dapat dilakukan dengan efisien, maka akan dibuat rencana penggunaan alat
pekerjaan yang akan dilaksanakan dapat dikoordinasikan dengan baik sehingga saling mendukung da
secara terus menerus.

2. Administrasi Pelaporan / Dokumentasi


Dalam melaksanakan suatu pekerjaan, kami selalu mengutamakan "Sukses Konstruksi & Sukses Ad
didasari pertimbangan bahwa kedua hal tersebut dalam pelaksanaan pekerjaan konstruksi merupakan h
dan mendukung satu sama lain. Oleh sebab itu dalam pelaksanaan administrasi dan dokumentasi, ak
berikut :

- Administrasi pelaksanaan pekerjaan dibagi atas 2 (dua) bagian pokok yaitu : Adm
administrasi umum dan keuangan. Untuk setiap bagian kegiatan tersebut, kami akan m
masing - masing.
- Administrasi teknik meliputi : Laporan pelaksanaan lapangan (harian, mingguan, bulanan),
curah hujan, foto - foto pelaksanaan, dan semua kegiatan berhubungan dengan teknik pelak

- Administrasi umum & keuangan meliputi : Surat menyurat berkenaan dengan pel
pengarsipan, laporan penyerapan keuangan, proses penyerapan dana, serta segala kegia
akan mendukung pelaksanaan pekerjaan.

- Pelaksanaan kegiatan ini akan dilaksanakan secara kontinyu selama pelaksanaan pekerj
disesuaikan dengan kemajuan pekerjaan serta perintah / petunjuk dari pihak pemilik / direksi

3. As Built Drawing
Gambar purnalaksana dilaksanakan setelah pekerjaan lapangan selesai dan mendapat persetujuan
Built Drawing ini di buat di atas kalkir dengan ukuran A.0 dan A.3 dan atau sesuai petunjuk direksi yan
denah dan detail beserta dengan penjelasannya dari pekerjaan yang telah dilaksanakan.

4. Dewatering / Kistdam/ Pengelak


Hal utama yang akan diperhatikan dalam pelaksanaan pekerjaan ini adalah : Bahwa lokasi pekerjaan in
yang telah berfungsi, dimana dalam melaksanakan pekerjaan tidak bisa menggaggu pola tanam ya
Untuk itu dalam melaksanakan pekerjaan, akan digunakan metode pengeringan :

- Kistdam dan pompanisasi


Kistdam dipasang pada bagian depan dan belakang jalur saluran yang akan dikerjakan dan
menggunakan pompa air, talang dan atau pipa sehingga air tetap dapat digunakan.

- Pengelak
Pada saluran / sungai dengan debit air yang cukup besar dan tidak mungkin dilakukan peng
dilakukan pembuatan saluran pengelak selama lokasi kerja memungkinkan. Saluran penge
akan dirapihkan kembali setelah pekerjaan selesai seperti pada kondisi semula.
Pada saluran / sungai dengan debit air yang cukup besar dan tidak mungkin dilakukan peng
dilakukan pembuatan saluran pengelak selama lokasi kerja memungkinkan. Saluran penge
akan dirapihkan kembali setelah pekerjaan selesai seperti pada kondisi semula.

- Kistdam sekeliling lokasi kerja


Bila lokasi saluran yang akan dikerjakan cukup luas, maka pengistdaman dilakukan han
dikerja saja. Mis. Pada pekerjaan pembuatan lining, maka terlebih dahulu dikerjakan satu
dengan memberi kistdan pada as saluran setelah itu kistdam dibalik pada bagian lainn
sebelumnya selesai.

- Sumuran dengan pompanisasi


pada area kerja yang tidak mungkin dilakukan pembuatan saluran pengelak, maka akan
alur air untuk mengalihkan dan menampung air untuk kemudian di alirkan ke alur selanjutn
(bila air tidak digunakan) dengan menggunakan pompa air.

5. Perbaikan / penyiapan logistik


Pelaksanaan kegiatan ini dilakukan pada awal pelaksanaan pekerjaan, dimana pelaksanaannya akan
kondisi lokasi kerja yang ada. Bilamana lokasi kerja tsb mempunyai akses jalan maka kami akan me
dahulu dan memeliharanya, tetapi pada lokasi yang tidak mempunyai akses tetapi memungkinka
pembuatan akses, maka akan disiapkan akses jalan, sedangkan pada lokasi yang tidak memungkinka
stock file di dekat lokasi kerja untuk kemudian dilangsir dengan menggunakan alat bantu kecil : Gerobak

II. PEKERJAAN TANAH


1. Pengukuran dan Pemasangan Bowplank
Pengukuran ketinggian dilaksanakan dengan terlebih dahulu menentukan titik utama (BM) dengan
Pengukuran dilaksanakan pada arah memanjang (long section) dan arah datar (cross section) denga
patok ukur yang kemudian ditandai dengan cat dan data elevasi. Jarak antar patok akan disesua
lapangan dan kebutuhan pekerjaan.

Pemasangan Bowplank dilaksanakan setelah hasil ukur disetujui direksi dengan mengacu pada patok
untuk menetukan posisi, bentuk dan ketinggian bowplank.

Pengukuran ini dilaksanakan tidak hanya diawal pekerjaan untuk menentukan dimensi dan arah peker
saat pelaksanaan dan diakhir pelaksanaan untuk mengecek keseksamaan dan kesesuaian ukuran peke

2. Pembersihan / Pembabatan Manual


Pembersihan dilakukan pada seluruh daerah kerja sebelum pelaksanaan pekerjaan. Pembersihan ini a
petunjuk dalam dokumen lelang dan atau atas petunjuk direksi.

Untuk pembersihan / pembabatan pada saluran dilaksanakan pada awal dan akhir pelaksanaan peke
saat pelaksanaan dimulai sampai selesai jaringan irigasi tersebut akan tetap bersih.

3. Galian Tanah Endapan (manual)


Pada saluran pasangan, endapan akan digali sampai dengan linning betul betul bersih dari endapan ta
saluran tanah galian endapan dilakukan sampai dengan dimensi saluran tersebut sesuai dengan dimen

Hasil galian akan dibuang pada sisi luar tanggul dan atau pada lokasi yang ditunjuk / disetujui dire
dirapihkan dengan prinsip tanah tersebut tidak akan masuk kembali ke dalam saluran.
4. Galian Tanah Untuk Bangunan
Sebelum pelaksanaan pekerjaan ini, terlebih dahulu akan dipasang bowplank sesuai dengan
diinginkan / sesuai gambar rencana. Pada pasangan pondasi dengan kedalaman yang cukup da
sebagai ruang kerja. Setelah pekerjaan pasangan selesai seluruh bagian galian yang tidak tersusun pas
kembali dengan cara seperti dijelaskan pada item pekerjaan timbunan.

Sebelum pasangan / bangunan di letakkan pada galian, maka galian tersebut haruslah kokoh dan tida
perlu akan dipasang turap pengaman), dan pada dasar galian harus kokoh dan padat (jika dasar galian
pemadatan dan atau perkuatan dengan pemasangan turap atau penggantian material serta pemberian

5. Timbunan Kembali dipadatkan


Material timbunan yang digunakan pada item ini adalah tanah hasil galian (yang digunakan adalah ta
baik dan dapat mencapai kepadatan optimum). Material tersebut terlebih dahulu akan dibersihkan
sebelum digunakan.

Pemadatan dilakukan lapis demi lapis dengan tebal padat maks. 20 cm menggunakan alat pemadat sta

6. Timbunan Tanah didatangkan (dipadatkan)


Pada pekerjaan ini, material yang digunakan adalah tanah timbunan yang didatangkan dari luar lo
terlebih dahulu harus mendapat persetujuan dari pihak direksi.

Pengambilan dan pengangkutan material ke lokasi pekerjaan dilaksankan secara mekanis dengan
Excavator untuk menggali dan mengangkut ke atas dump truck untuk kemudian dibawah ke lokas
tersebut akan di drop langsung ke lokasi pekerjaan dengan terlebih dahulu memperhitungkan volume
sebagai dasar untuk menentukan banyaknya dan jarak tumpukan di lokasi pekerjaan.

Tumpukan - tumpukan mat. timbunan tersebut kemudian akan dihampar dengan menggunakan buld
dirapihkan dengan tenaga manual. Setelah timbunan rata dengan ketebalan gembur kurang lebih 3
dipadatkan dengan menggunakan Vibrator Roller sampai mencapai kepadatan optimal dengan keteba
cm. Bilamana kadar air dari timbunan kurang untuk mencapai kepatan optimum, maka akan dilakukan p

Catatan :
Sebelum pekerjaan timbuanan dilaksanakan, maka daerah yang akan ditimbuan terlebih dahulu dib
tumbuhan dan kotoran.

III. PEKERJAAN PASANGAN


1. Bongkaran Pasangan Batu
Bongkaran dilaksanakan pada bagian - bagian bangunan yang rusak dan atau akan dilakukan peruba
akan dibuang pada lokasi yang telah ditunjuk oleh pihak direksi dan tidak akan digunakan lagi dalam pa

2. Pasangan Batu 1 : 4
Pasangan batu dilaksanakan setelah pekerjaan galian telah siap dan bowplank telah terpasang. B
digunakan sesuai dengan spek dan telah disetujui direksi terlebih dahulu.
Pasangan batu dilaksanakan setelah pekerjaan galian telah siap dan bowplank telah terpasang. B
digunakan sesuai dengan spek dan telah disetujui direksi terlebih dahulu.

Sebelum batu pertama dipasang maka pada dasar galian terlebih dahulu akan diberi mortar /camp
langsung duduk di atas tanah / galian. Susunan batu akan dipasang dengan rapi dan saling mengikat
setiap batu diberi spasi dan diisi campuran yang padat dengan ketebalan antara 2 - 5 cm. (t
bersinggungan). Pada sisi belakang pasangan ( sisi yang tidak diplester) akan dibrankal agar pasangan
benar kedap air (tidak bocor).

3. Plesteran 1 : 3
Plesteran pada sisi pasangan batu akan dilaksanakan dengan dua langkah, yakni : Langkah pertama, p
dilapisi campuran dengan permukaan kasar (dibrankal) untuk mengisi semua celah yang masih ada s
permukaan pasangan batu dengan ketebalan kurang lebih 1 cm. Pada langkah kedua, pasangan batu
kemudian dilapisi lagi dengan campuran dengan ketebalan 1 - 2 cm untuk selanjutnya diratakan deng
dihaluskan dengan seterika campuran sehingga didapat tebal plesteran antara 2 - 3 cm.

Sebelum plesteran dimulai, maka permukaan pasangan batu harus dibersihkan dari semua kotoran da
disiram dengan air untuk pasangan baru, sedangkan pada pasangan lama akan disiram dengan air sem

4. Beton 1 : 2 : 3
Pekerjaan beton dilaksanakan setelah item pekerjaan - pekerjaan : Pembesian dan bekisting selesai da

Pencampuran material beton (Semen, pasir, kerikil dan air) akan dilaksanakan dengan menggunakan
menggunakan takaran yang diizinkan.
Beton akan dipadatkan dengan menggunakan vibrator beton.
Setelah pengecoran selesai, maka akan dilakukan perawatan beton dengan melakukan penyiraman d
sampai beton mencapai umur yang baik (21 hari).

5. Pembesian
Pembesian dilaksanakan dengan menggunakan alat bantu kecil. Besi yang akan digunakan adalah be
korosif / karatan) dan lurus. Bagian besi yang telah bengkok tidak akan diluruskan kembali untuk diguna

6. Bekisting (tanpa perancah dan dengan perancah).


Kayu yang digunakan adalah kayu yang kokoh dan tidak baling. Pemasangan dilakukan sesuai denga
beton yang akan dicapai sesuai gambar kerja. Bekisting akan dibuat kaku dan kuat dengan memberi p
dengan perhitungan bahwa bekisting akan tetap kuat menahan beban beton sampai mencapai umur ya

Untuk mendapatkan permukaan yang baik, maka permukaan bekisting akan dilapisi dengan karung sem
sisinya diberi minyak bekisting.

IV. PEKERJAAN LAIN - LAIN


1. Pembuatan Pintu
Pintu akan dibuat pada bengkel yang telah medapat rekomendasi dari pihak direksi / pemilik pekerjaan.
.d.
III.
b. .e.
:III. f.f.I.b.Galian
c. PINTU
Material
PEKERJAAN
Material
Agar
PEKERJAAN
Sebelum
Untuk
Plesteran
Anyaman
Pekerjaan
Pasangan
dimensi
lumpur
AIR
pekerjaan
timbunan
yang
pengecatan
menggunakan
Bronjong
Bekisting
batu
dapat
PERSIAPAN
digunakan
PASANGAN
galian
harus
tulangan
tanah
kualifikasikan
menggunakan
tanpa
pada
menggunakan
dilaksanakan,
yang
untuk
material
kami
perancah
linning
digunakan
pekerjaan
akan
penggalian
dengan
kawat
atau
mengikuti
menggunakan
material
maka
adalah
beton
saluran
yang
syarat-syarat
terlebih
tanah
yang
telah
adalah
Standar
material
tanah
jelek,
telah
papan
diizinkan
dahulu
pasir
sama
Nasional
tanah
sesuai
mendapat
oleh
kelas
yang
permukaan
dengan
oleh
sebab
yang
yang
2Indonesia
bermutu
dengan
pihak
dapat
persetujuan
itu
pasangan
ditentukan
tanah
direksi
besi
mencapai
tinggi
ketebalan
NI-2bekas
harus
batu.
dari
dan
dalam
kepadatan
direksi
galian
3telah
diamplas.
Permukaan
Cmgambar
mendapat
dengan
ini harus
kering
Pengecatan
rencana
harus
syarat-syar
di
persetuj
tidak
buang
rata
mak kud
sampai
direksi
Penyimpanan
Setelah
cara
a.
sebanyak
.pekerjaan
i.a.pasangan
atau Untuk
Batu
Karena
menganyam
sesuai
sedangkan
kebelakang
papan
2memperbaiki
ini
sehalus
tahap.
pekerjaan
petunjuk
dilaksanakan
besi
di sambung
untuk
Pada
yaitu
mungkin.
dilapangan
tanggul
direksi
inikerikil
tahap
pintu
melilit
adalah
terlebih
dengan
Plesteran
)(sesuai
air
pertama
jika
adalah
kawat
akan
yang
pekerjaan
tidak
dahulu
spesifikasi
rapih
di
kerikil
sebanyak
tidak
pengecatan
ada,
lindungi
menggangu
permukaan
boleh
dilakukan
rehabilitasi,
yang
maka
teknik
tiga
agar
merubah
dasar,
tidak
terlebih
(lahan
kali
pengukuran
% tidak
papan
rapuh
95
maka
pengecatan
pada
dimensi
sawah
dahulu
karatan
akan
(kokoh)
setiap
adayang
dan
atau
dilihat
dan
ini
dilapisi
beberapa
persambungan
pemasangan
dan
cukup
ada,
merusak
aman
kondisi
bersih
oleh
dengan
tipis,
zat-zat
pekerjaan
sebab
tanggul
pintu
dari
setelah
bowplank.
karung
dengan
itu
yang
yang
kotoran.
) pada
dan
pasangan
kering
dapat
ada,
Sedang
semen
atau
pasangan
bentuk
Ukuran
jika
baru
pada
mengurang
yang
pada
untuk
lubang
dilanju
kerikil
tempa
batu
rus
pas
me
m
disetujui
digunakan
.dibuka,
tulangan
kehilangan
ketupat
ketahapan
.,tegak
Untuk
diperhitungkan
pembongkaran.
Permukaan
Lingkup
pada
penimbunan
maka
dan
oleh
akan
berikutnya
Pekerjaan
air
ketinggian
ukuran
kasar
direksi.
akan
semen
disesuaikan
ketebalan
Karena
dengan
lubang
diperbaiki
yang
Persiapan
Galian
tertentu
pekerjaan
tebal
ukuran
plesteran.
adalah
dengan
lumpur
di
(sesuai
maka
meliputi
12
bengkel,
berat
ketebalan
cm
pasangan
Adapun
ini
spesifikasi
perlu
antara
xsebagian
:12
Mobilisasi
tapi
dilakukan
cm,
tebal
6pasangan
yang
bila
- dimana
teknis
15besar
plesteran
Kg
dibongkar
kondisinya
dan pemadatan
atau
isi
demobilisasi
dan
dilakukan
setiap
petunjuk
adalah
jarak
masih
sudah
kotak
per
pada
besi
berhubungan
)2alat,
dilakukan
paten
layer
Cm
bronjong
seperti
saluran,
Administrasi
dan
(1dilayer
penggalian
lapangan,
adalah
dilaksanakan
yang
dengan
karena
= 40 pelaporan
ditentukan
1 Cm
m3
pasangan
maka
itu
yang
gembur)
(12Toraja
sebelum
xkali
/lebih
0.5
akan
dalam
dokumentasi,
yang
sampai
xUtara,
sampai
dari
2)dikerjak
m
sepes
peker
masih
pasa
me
13m
.dilaksanakan
teknik
lapangan
maka
.ii.
elevasi
Built
sebagai
ketebalan
Pasir
drawing
pembongkarannya
danyang
ruang
atau
tersebut
ditentukan.
terlebih
kerja
petunjuk dahulu
Penghamparan
direksi
harusdilakukan
hati - hatitimbunan
pengeringan,
agar tidak dilakukan
mempengaruhi
ini dimaksudkan
secara manual pasangan
agar danlumpurpemadatannya
lainnya.
yng ada Untuk
bisa menggunakan
membongkar
benar-benar bers pas
st
.Slump
tidak.Plesteran
.Pasir
karena
padamengalir
adalah
untuk
daerah
padaakanpekerjaan
pasir
pekerjaan
dan
yang
dilaksanakan
mengendap
yang
berhubungan
beton
ini
kadararea adalah
lumpurnya
setelah
kepenimbunan
ruas
dengan
antara
lainnya
permukaan
tidak
pasangan
7tidak
- 12
lebih Cm
begitu
pasangan
dari
yang5luas tidak
% dengan
batu
dibongkar
dibersihsihkan
gradasi diperlukan
yang baik dan
alatdan
disiram
yang
tidakcukup
dengan
rapuh ringan
air, dan
seper bi
: iii. .pasangan
:Pada
Pekerjaan
Material
Pekerjaan
Airpekerjaan
hasil
ini
batu
persiapan
terbagi
bongkaran
lama
ini item
2 ini
yang
item
beton
antara
tidak
: akan
a.
terdiri
dapat
lain
Timbunan
diplester,
meliputi
menjadi
digunakan bekas
kegiatan
maka
2 item,
lagigalian
permukaannya
untuk
yaknidipadatkan
pekerjaanakan pasangan,disiramkecuali
dengan atasair izin
semen.dari direksi
Hal ini dimak
.b. Mobilisasi
Adalah
agar Timbunan
.Lining
daya air rekat
yang
dan
beton
tanah
demobilisasi
bersih,
plesteran
tanpa
dipadatkan
tidak
tulang
denganmengandung
alat
(material
1 Pcke
pasangan
: lokasi
2 Psr
sekitar)
lumpur
: paket
batu
3 Krklbetul-betul
dan
-pekerjaan
zat-zatmengikat
serta
yang mengurangi
mobilisasi alat mutu keportal
setiap tempat pelaksanaan
.pekerjaan, .pekerjaan
Ketinggian pasangan
Beton 1 Pc ini
barudi
: 2kondisikan
Psr
tidak : 3boleh
Krkldengan
- lebih kegiatan
dari 50 Cm lapangandan dilanjutkan
agar tidak setelah
saling tumpang
pasangan tindih
kering, dengan kete
,.Administrasi
spasi kurangpelaporan
lebih 2 Cm / dokumentasi
(tidak boleh lebih dilaksanakan
dari 5 Cm.) setiapserta hari.
pasangan
Ini dilakukan
batu tidak agarbisatidak
bersentuhan
terjadi kerancuan data
Untuk mengingat lining
pasangan
pekerjaan
betonyangtanpa
ini bersambung
harustulang seiring
akan dengan
dilaksanakan
kemajuan
pasangan dengan
pekerjaan
lamacara harus
lapangan.
menyekat
disiramMisal,
tiapa
duludaerah
pekerjaan
dengan kerja
airdokumentasi
dengan
semen jarakdan yang
tidak
perm
d.:III.
f.I.b.Galian
c. Material
PEKERJAAN
Material
PEKERJAAN
Plesteran
Pasanganlumpur
timbunan
yang
menggunakan
batu
dapat
PERSIAPAN
digunakan
PASANGAN
harus
tanah
kualifikasikan
menggunakan
yang
untuk
materialdigunakan
pekerjaan
penggalian
dengan material
adalah
beton
syarat-syarat
tanah
yang
adalah
material
jelek,
telah
pasir
sama
tanah
mendapat
olehyang
dengan
sebab
yangbermutu
dapat
persetujuan
itu
pasangan
tanah
mencapai
tinggi
bekas
batu.
dari
dan kepadatan
direksi
galian
telah
Permukaanmendapat
dengan
ini harus
kering
harus
syarat-syar
di
persetuj
tidak
buang
rataku
sampai
direksi
.pasangan
i.a. atauBatu
Karena
sesuai
sedangkan
kebelakang
sehalus
pekerjaan
petunjuk
untuk
mungkin.
tanggul
direksi
inikerikil
adalah
Plesteran
)(sesuai
jika
adalahpekerjaan
tidak
spesifikasi
kerikil
tidak
menggangu
boleh
rehabilitasi,
yangteknik
merubah
tidak
(lahan
% rapuh
95
maka
dimensi
sawah(kokoh)
adayang
atau
beberapa
dan
ada,
merusak
bersih
olehpekerjaan
sebab
tanggul
dari itu
kotoran.
) pada
dan
pasangan
atau
pasangan
Ukuran
pada
yangkerikil
tempa
batume
disetujui
digunakan
.,diperhitungkan
Untuk
pembongkaran.
Permukaan
Lingkuppenimbunan
oleh
akan
Pekerjaan
kasar
direksi.
disesuaikan
ketebalan
Karena
dengan
yang
Persiapan
Galian pekerjaan
tebal
ukuran
plesteran.
dengan
lumpur
maka
meliputi
berat
ketebalan
pasangan
Adapun
iniperlu
antara
sebagian
: Mobilisasi
dilakukan
tebal
6pasangan
yang
- 15besar
plesteran
Kg
dibongkar
dan pemadatan
demobilisasi
dan
dilakukan
adalah
jarak
masihper
pada
besi
berhubungan
2alat,
layer
Cmseperti
saluran,
Administrasi
dan
(1 layer
dilaksanakan
yang
dengan
karena
= 40pelaporan
ditentukan
Cmpasangan
itugembur)
2sebelum
kali
/ dalam
dokumentasi,
yang
sampai
sampai
sepes
peker
masih
mem
.dilaksanakan
teknik
maka
.ii.
elevasi
Built
ketebalan
Pasir
drawing
pembongkarannya
dan
yang atau
tersebut
ditentukan.
terlebih
petunjuk dahulu
Penghamparan
direksi
harusdilakukan
hati - hatitimbunan
pengeringan,
agar tidak dilakukan
mempengaruhi
ini dimaksudkan
secara manual
pasangan
agar danlumpurpemadatannya
lainnya.
yng ada Untuk
bisa menggunakan
membongkar
benar-benar bers pas
st
.Slump
tidak
.Plesteran
.Pasir
karena
padamengalir
adalah
untuk
daerah
padaakanpekerjaan
pasir
pekerjaan
dan
yang
dilaksanakan
mengendap
yang
berhubungan
beton
ini
kadararea adalah
lumpurnya
setelah
ke
penimbunan
ruas
dengan
antara
lainnya
permukaan
tidak
pasangan
7tidak
- 12
lebihCm
begitu
pasangan
dari
yang5luastidak
% dengan
batu
dibongkar
dibersihsihkan
gradasi diperlukan
yang baikdan
alatdan
disiram
yangtidakcukup
dengan
rapuh ringan
air, dan
seper bi
: iii.
.pasangan
:Pada
Pekerjaan
Material
Pekerjaan
Airpekerjaan
hasil
ini
batu
persiapan
terbagi
bongkaran
lama
ini item
2 ini
yang
item
beton
antara
tidak
: akan
a.
terdiri
dapat
lain
Timbunan
diplester,
meliputi
menjadi
digunakan bekas
kegiatan
maka
2 item,
lagi
galian
permukaannya
untuk
yaknidipadatkan
pekerjaanakanpasangan,
disiramkecuali
dengan atas
air izin
semen. CV.direksi
dari CAHAYA
Hal ini dimak T
.b.Mobilisasi
Adalah
agarTimbunan
.Lining
dayaair rekat
yang
dan
beton
tanah
demobilisasi
bersih,
plesteran
tanpa
dipadatkan
tidak
tulang
denganmengandung
alat
(material
1 Pc
ke
pasangan
: lokasi
2 Psr
sekitar)
lumpur
: paket
batu
3 Krklbetul-betul
dan
-pekerjaan
zat-zatmengikat
serta
yang mengurangi
mobilisasi alat mutu keportal
setiap tempat pelaksanaan
.pekerjaan, .pekerjaan
Ketinggian pasangan
Beton 1 Pc ini
barudi
: 2kondisikan
Psr
tidak : 3boleh
Krkldengan
- lebih kegiatan
dari 50 Cm lapangan
dan dilanjutkan
agar tidak setelah
saling tumpang
pasangan tindih kering, dengan kete
,.Administrasi
spasi kurangpelaporan
lebih 2 Cm / dokumentasi
(tidak boleh lebih dilaksanakan
dari 5 Cm.) setiapsertahari.
pasangan
Ini dilakukan
batu tidak agar
bisatidak
bersentuhan
terjadi kerancuan data
Untuk
mengingat lining
pasangan
pekerjaan
betonyangtanpa
ini bersambung
harustulang seiring
akan dengan
dilaksanakan
kemajuan
pasangan dengan
pekerjaan
lamacaraharus
lapangan.
menyekat
disiramMisal,
tiapa
duludaerah
pekerjaan
dengan kerja
airdokumentasi
dengan
semen jarakdan yang
tidak
perm
dari
.apabila
.pasangan
3 m foto
danlamaOpenyekat
% tertinggal,
harus dipastikan
menggunakan
maka akan bersihsulit
potongan
lagi mengambilnya
papan 3 Cm dengan pada saat ketebalan
pekerjaansesuai
sudah kebutuhan
dilaksanakan dan
MUH.mudahILYAS dic
kembali.
AsUntukbuiltpasangan
drawing
Hal ini bertujuan
dilaksanakan
permukaan agar akan
sesuai
pasangan
digunakan
dengan dapat
batu
pelaksanaan
dihentikan
pilihan dengan lapangan
padapermukaan
sekatsetelah
yangyang
ada
mendapat
dan
bagus bilasehingga
terjadi
persetujuan kerusakan
tidakdari
menyulitk
pada
pihak
Direk
satu
.pada
direksi
sekat
pekerjaan
beton plesteran
tidak mempengaruhi
atau siaran sekat lainnya (elastisitas). Setelah papan penyekat dibuka , lobang bekas se
.diisi dengan bahan pengisi (pasir + aspal)
Karena
II. PEKERJAAN
beton ini langsung
TANAH berhubungan dengan tanah, maka sebelum pekerjaan beton terlebih dahulu area kerja d
.lantai kerja dengan ketebalan tidak kurang dari 2 cm
a. Sebelum kegiatan konstruksi dilaksanakan, maka terlebih dahulu dilakukan pengukuran dan pemasangan bowp
ini sangat penting dalam pekerjaan irigasi, mengingat elevasi sangat mengikat. Oleh sebab itu setelah peke
selesai kami laksanakan perlu ada check cross dan persetujuan dari pihak direksi sebelum melangkah ke pek
.selanjutnya. Waktu pelaksanaan pekerjaan ini disesuaikan dengan pekerjaan tanah/pasangan

/b. Karena pekerjaan ini adalah pekerjaan rehabilitasi jaringan irigasi yang sudah berfungsi, maka pekerjaan
.pengeringan sangat dibutuhkan. Pekerjaan ini akan dikondisikan dengan pelaksanaan pekerjaan lainnya

c. Pembersihan merupakan pekerjaan awal pada setiap lokasi pekerjaan. Pekerjaan ini meliputi : Pemba
.pembersihan akar kayu dan lain-lain yang dapat merusak/mengurangi mutu pekerjaan
N

n untuk melaksanakan pekerjaan - pekerjaan


eruntukkan untuk memudahkan pelaksanaan

ncana penggunaan alat sehingga item - item


ga saling mendukung dan dapat berlangsung

onstruksi & Sukses Administrasi", dengan


konstruksi merupakan hal yang saling terkait
si dan dokumentasi, akan dilakukan hal - hal

n pokok yaitu : Administrasi teknik serta


tersebut, kami akan menempatkan petugas

n, mingguan, bulanan), kemajuan pekerjaan,


gan dengan teknik pelaksanaan lapangan.

berkenaan dengan pelaksanaan lapangan,


ana, serta segala kegiatan administrasi yang

ma pelaksanaan pekerjaan berlangsung dan


ari pihak pemilik / direksi.

mendapat persetujuan dari pihak direksi. As


suai petunjuk direksi yang terdiri atas gambar
sanakan.

ahwa lokasi pekerjaan ini pada jaringan irigasi


nggaggu pola tanam yang telah ditetapkan.
n:

ang akan dikerjakan dan airnya akan dialirkan


pat digunakan.

mungkin dilakukan pengistdaman, maka akan


gkinkan. Saluran pengelak yang telah dibuat
disi semula.
mungkin dilakukan pengistdaman, maka akan
gkinkan. Saluran pengelak yang telah dibuat
disi semula.

stdaman dilakukan hanya pada lokasi yang


dahulu dikerjakan satu / sebelah bagian saja
balik pada bagian lainnya setelah pekerjaan

pengelak, maka akan dibuat sumuran pada


alirkan ke alur selanjutnya dan atau dibuang

a pelaksanaannya akan disesuaikan dengan


an maka kami akan memperbaikinya terlebih
es tetapi memungkinkan untuk penyiapan /
yang tidak memungkinkan, maka akan dibuat
lat bantu kecil : Gerobak dorong.

tik utama (BM) dengan persetujuan direksi.


ar (cross section) dengan memasang patok -
tar patok akan disesuaikan dengan kondisi

an mengacu pada patok - patok pengukuran

dimensi dan arah pekerjaan tetapi juga pada


kesesuaian ukuran pekerjaan.

rjaan. Pembersihan ini akan dilakukan sesuai

akhir pelaksanaan pekerjaan sehingga pada


rsih.

l bersih dari endapan tanah, sedangkan pada


ut sesuai dengan dimensi awal.

ditunjuk / disetujui direksi untuk selnajutnya


aluran.
plank sesuai dengan dimensi galian yang
alaman yang cukup dalam, akan dilebihkan
yang tidak tersusun pasangan akan ditimbun

haruslah kokoh dan tidak mudah runtuh (bila


padat (jika dasar galian labil, akan dilakukan
aterial serta pemberian bahan pengisi).

ng digunakan adalah tanah hasil galian yang


ahulu akan dibersihkan dari semua kotoran

unakan alat pemadat stamper.

didatangkan dari luar lokasi pekerjaan yang

ecara mekanis dengan menggunakan alat :


udian dibawah ke lokasi pekerjaan. Material
mperhitungkan volume yang akan digunakan
rjaan.

gan menggunakan buldozer dan diratakan /


gembur kurang lebih 30 cm kemudian akan
optimal dengan ketebalan tidak lebih dari 20
, maka akan dilakukan penyiraman.

buan terlebih dahulu dibersihkan dari semua

akan dilakukan perubahan. Hasil bongkaran


digunakan lagi dalam pasangan baru.

lank telah terpasang. Bahan - bahan yang


lank telah terpasang. Bahan - bahan yang

kan diberi mortar /campuran agar batu tidak


api dan saling mengikat / mengancing dimana
n antara 2 - 5 cm. (tidak ada batu yang
dibrankal agar pasangan batu tersebut benar -

kni : Langkah pertama, pasangan batu diberi /


celah yang masih ada serta menutup semua
h kedua, pasangan batu yang telah dibrankal,
anjutnya diratakan dengan papan gosok dan
2 - 3 cm.

n dari semua kotoran dan sisa capuran serta


n disiram dengan air semen.

dan bekisting selesai dan disetujui direksi.

n dengan menggunakan beton molen dengan

melakukan penyiraman dan atau perendaman

an digunakan adalah besi yang bersih (bebas


an kembali untuk digunakan lagi.

dilakukan sesuai dengan bentuk dan ukuran


kuat dengan memberi perkuatan - perkuatan
mpai mencapai umur yang ditentukan.

apisi dengan karung semen dan pada bagian

eksi / pemilik pekerjaan.


alian
diamplas.
elah
Permukaan
m
padatan
eksi
Cmgambar
mendapat
dengan
ini harus
kering
Pengecatan
rencana
harus
syarat-syarat
di
persetujuan
tidak
buang
rata
makakurang
dilakukan
dan
minimal
sebelum
dari
pori
dari
wplank.
elah
an
ul
dengan
arung
yang
yang
kotoran.
tu) pada
dan
pasangan
kering
dapat
ada,
Sedang
semen
atau
pasangan
bentuk
Ukuran
jika
baru
pada
mengurangi
yang
pada
untuk
lubang
dilanjutkan
kerikil
tempat
batu
rusak
pasangan
membutuhkan
menjaga
harus
yang
belah
yang
mutu
dapat
an,
ditentukan
an
na
0nakan
1
ian
elaporan
Cm
m3
pasangan
maka
itu
yang
gembur)
(12Toraja
sebelum
xkali
/lebih
0.5
akan
dalam
dokumentasi,
yang
sampai
xUtara,
sampai
dari
2)dikerjakan
m
sepesifikasi
pekerjaan
masih
pasangan
mencapai
13mencapai
dan
bagus
diAs
ini 2010
Agustus
annya
Untuk
a bisa menggunakan
membongkar
benar-benar bersih pasangan
stamper
dan
nsiram
ang
tidakcukup
dengan
rapuh ringan
air, dan
seperti
bilabetel
ada
air
as izin
semen.dari direksi
Hal ini dimaksudkan
al
iap tempat pelaksanaan .1
ggantindih
kering, dengan ketebalan
sentuhan
terjadi kerancuan data .2
an aan
kerja
airdokumentasi
dengan
semen jarakdan yang
tidak
permukaan
lebih
alian
elah
Permukaan
padatan
eksi mendapat
dengan
ini harus
kering
harus
syarat-syarat
di
persetujuan
tidak
buang
ratakurang
dan
minimal
dari
pori
dari
an
ulkotoran.
tu) pada
dan
pasangan
atau
pasangan
Ukuran
pada
yangkerikil
tempat
batumembutuhkan
harus
yang
yang
ditentukan
an
na
0nakan
elaporan
Cmpasangan
itugembur)
2sebelum
kali
/ dalam
dokumentasi,
yang
sampai
sampai
sepesifikasi
pekerjaan
masih
mencapai
mencapai
dan
bagus
As
ini
annya
Untuk
a bisa menggunakan
membongkar
benar-benar bersih pasangan
stamper
dan
nsiram
angtidakcukup
dengan
rapuh ringan
air, dan
seperti
bilabetel
ada
air
as izinsemen. CV.direksi
dari CAHAYA
Hal TIMUR UTAMA
ini dimaksudkan
al
iap tempat pelaksanaan .1
ggantindih kering, dengan ketebalan
sentuhan
terjadi kerancuan data .2
an aan
kerja
airdokumentasi
dengan
semen jarakdan yang
tidak
permukaan
lebih
hebutuhan
dilaksanakan dan
MUH.mudahILYAS dicabut
MAULANA
sehingga
terjadi
persetujuankerusakan
tidakdari
menyulitkan
pada
pihak salah
Direktur.3
dibuka , lobang bekas sekat

ebih dahulu area kerja diberi

dan pemasangan bowplank. Hal


sebab itu setelah pekerjaan ini
belum melangkah ke pekerjaan
gan

ungsi, maka pekerjaan dewatering


erjaan lainnya

ini meliputi : Pembabatan dan