REKAPITULASI

DAFTAR KUANTITAS DAN HARGA

KEGIATAN : PEMBANGUNAN SARANA DAN PRASARANA DI KAB RAJA AMPAT


PEKERJAAN : PEMBANGUNAN REHAB RUMAH DINAS
LOKASI : WAISAI DISTRIK WAISAI KOTA KAB. RAJA AMPAT
TAHUN ANGGARAN : 2013

NO URAIAN PEKERJAAN TOTAL HARGA (Rp)

I. PEKERJAAN PERSIAPAN DAN PENDAHULUAN. Rp 8,848,600.00

II. PEKERJAAN TANAH DAN PONDASI Rp 44,196,247.81

III. PEKERJAAN BETON Rp 303,994,104.73

IV. PEKERJAAN DINDING PAGAR DAN LANTAI Rp 171,793,408.85

V. PEKERJAAN ATAP DAN PLAFOND Rp 62,016,072.98

VI. PEKERJAAN PINTU DAN JENDELA Rp 26,217,887.88

VII. PEKERJAAN CAT DAN LABURAN Rp 22,070,795.28

VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI Rp 11,489,200.00

IX. PEKERJAAN INSTALASI LISTRIK Rp 6,475,220.00

X. PEKERJAAN INSTALASI AIR Rp 15,902,890.00

XI PEKERJAAN AKHIR Rp 4,300,000.00

SUB TOTAL 677,304,427.52


PPN 10% 67,730,442.75
TOTAL HARGA 745,034,870.28
PEMBULATAN Rp 745,000,000.00

Terbilang : # TUJUH RATUS EMPAT PULUH LIMA JUTA RUPIAH #

Waisai, September 2013


DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PEMBANGUNAN REHAB RUMAH DINAS
LOKASI : WAISAI DISTRIK WAISAI KOTA KABUPATEN RAJA AMPAT
TAHUN ANGGARAN : 2013

Perkiraan
No Uraian Kegiatan Kuantitas Satuan Harga Satuan Jumlah Harga
(Volume)
1 2 3 4 5 6

I. PEKERJAAN PERSIAPAN DAN PENDAHULUAN.


1 Pengukuran dan Pembersihan Lokasi 165.00 m2 14,000.00 2,310,000.00
2 Pembuatan Direksi Keet 1.00 Ls 3,000,000.00 3,000,000.00
3 Pelaporan dan Foto dokumentasi 1.00 Ls 650,000.00 650,000.00
4 Pekerjaan Pas. Bouwplank 52.00 m' 55,550.00 2,888,600.00
SUB TOTAL Rp 8,848,600.00

II. PEKERJAAN TANAH DAN PONDASI


1 Galian Tanah Pondasi 67.25 m3 36,800.00 2,474,947.20
2 Timbunan Tanah Kembali 16.81 m3 17,640.00 296,590.14
3 Urugan Pasir Bawah Pondasi 6.33 m3 409,200.00 2,589,315.30
4 Urugan Pasir di Bawah Lantai 9.65 m3 409,200.00 3,947,879.76
5 Urugan Tanah Timbunan 17.92 m3 200,800.00 3,598,014.72
6 Pas. Batu Kosong/Aanstamping 9.49 m3 708,420.00 6,721,134.75
7 Pas. Batu Gunung 1 : 3 17.76 m3 1,383,500.00 24,568,365.94
SUB TOTAL Rp 44,196,247.81

III. PEKERJAAN BETON


1 Cor Sloof 20/25 (1:2:3) 3.16 m3 4,807,040.41 15,202,265.29
2 Cor Kolom 40/40 (1:2:3) 12.32 m3 5,872,599.87 72,350,430.40
3 Cor Kolom 15/15 (1:2:3) 1.42 m3 5,872,599.87 8,324,410.32
4 Cor Ringbalok 15/15 (1:2:3) 1.90 m3 7,078,394.83 13,431,254.18
5 Cor Pondasi Cakar Ayam / Floor Plat (1:2:3) 6.24 m3 5,872,599.87 36,627,405.39
6 Cor Balok 30/50 (1:2:3) 4.20 m3 7,078,394.83 29,729,258.27
7 Cor Balok 20/40 (1:2:3) 2.54 m3 7,078,394.83 17,979,122.86
8 Cor Balok 15/20 (1:2:3) 0.62 m3 7,078,394.83 4,353,212.82
9 Cor Balok Knopy (1:2:3) 4.76 m3 7,078,394.83 33,697,406.41
10 Cor Plat Lantai T. 10 cm (1:2:3) 8.90 m3 5,872,599.87 52,289,629.24
11 Cor Tangga (1:2:3) 2.21 m3 5,872,599.87 12,980,207.49
12 Cor Listplank Beton (1:2:3) 1.20 m3 5,872,599.87 7,029,502.04
SUB TOTAL Rp 303,994,104.73

IV. PEKERJAAN DINDING DAN LANTAI


1 Pas. Dinding Batu Tela 1 : 4 323.65 m2 135,960.00 44,004,065.82
2 Plesteran 1 : 3 + acian 647.31 m2 68,154.00 44,116,697.59
3 Cor Rabat Dasaran 5.97 m3 1,605,800.00 9,591,122.24
4 Pas. Lantai Keramik (40x40) 152.00 m2 247,200.00 37,574,400.00
5 Pas. Lantai dan Dinding Keramik KM/ Wc (20x20) 56.13 m2 240,640.00 13,507,123.20
6 Pas. Realing Tangga 1.00 Ls 15,000,000.00 15,000,000.00
7 Pas. Realing Balkon 1.00 Ls 8,000,000.00 8,000,000.00
SUB TOTAL Rp 171,793,408.85

V. PEKERJAAN ATAP DAN PLAFOND


1 Pas. Kuda Kuda, Skoor 5/10 (Kayu Besi Klas 1) 1.08 m3 4,827,000.00 5,202,516.47
2 Pas. Gording dan Balok Nok 5/10 (Kayu Besi Klas 1) 1.24 m3 4,098,100.00 5,084,492.18
3 Pas. Kasau, Reng Atap Multiroof 1.03 m3 4,098,100.00 4,224,582.12
4 Pas. Atap Multiroof 178.29 m2 108,935.00 19,422,347.96
5 Pas. Bubungan Mutiroof 29.37 m' 77,150.00 2,265,895.50
6 Pas. Lisplank kayu (Kayu Besi Klas 1) 59.64 m' 61,625.00 3,675,315.00
7 Pas. Rangka dan Plafond (Kayu Klas 2) 211.96 m2 104,460.00 22,140,923.76
SUB TOTAL Rp 62,016,072.98

VI. PEKERJAAN PINTU DAN JENDELA


1 Pas. Kusen Pintu, Jendela, Ventilasi (Kayu Besi Klas 1) 1.02 m3 642,625.00 656,875.21
2 Pas. Pintu Panel (Kayu Besi Klas 1) 10.33 m2 539,750.00 5,576,697.00
3 Pas. Pintu Lapis Plat Seng (Kayu Besi Klas 1) 3.87 m2 901,687.50 3,493,588.22
4 Pas. Jendela Kayu Klas 1 + Kaca Ryben 5 mm 26.25 m2 596,905.00 15,668,756.25
5 Pas. Kaca Mati Ryben 5 mm 2.48 m2 331,440.00 821,971.20
SUB TOTAL Rp 26,217,887.88

VII. PEKERJAAN CAT DAN LABURAN


1 Cat Meney Kusen Pintu, Jendela dan Ventilasi 13.62 m2 56,292.50 766,703.85
2 Cat Kilap Kusen Pintu, Jendela dan Ventilasi 66.46 m2 41,210.00 2,738,618.79
3 Cat Kilap Daun Pintu Dan Jendela 59.36 m2 41,210.00 2,446,258.57
4 Cat/laburan Tembok 647.31 m2 18,785.60 12,160,087.95
5 Cat Plafond 211.96 m2 18,679.00 3,959,126.12
SUB TOTAL Rp 22,070,795.28

Perkiraan
No Uraian Kegiatan Kuantitas Satuan Harga Satuan Jumlah Harga
(Volume)
1 2 3 4 5 6

VIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 Pas. Kunci Tanam Biasa 10.00 Bh 177,500.00 1,775,000.00
2 Pas. Engsel Pintu 30.00 Bh 53,940.00 1,618,200.00
3 Pas. Engsel Jendela 92.00 Bh 34,460.00 3,170,320.00
4 Pas. Grendel Pintu 3.00 Bh 32,960.00 98,880.00
5 Pas. Grendel Jendela 49.00 Bh 32,960.00 1,615,040.00
6 Pas. Hak Angin Jendela 46.00 Bh 37,000.00 1,702,000.00
7 Pas. Tarikan Pintu & Jendela 56.00 Bh 26,960.00 1,509,760.00
SUB TOTAL Rp 11,489,200.00

IX. PEKERJAAN INSTALASI LISTRIK


1 Pas. Instalasi Titik Penerangan 20.00 Titik 182,500.00 3,650,000.00
2 Pas. Saklar Tunggal 13.00 Bh 36,960.00 480,480.00
3 Pas. Saklar Ganda 6.00 Bh 40,710.00 244,260.00
4 Pas. Stop Kontak 14.00 Bh 35,710.00 499,940.00
5 Pas. Lampu Philips SL 18 Watt 14.00 Bh 68,460.00 958,440.00
6 Pas. Lampu Pijar SL 11 Watt 8.00 Bh 60,210.00 481,680.00
7 Pas. Box Sekring 2.00 Bh 80,210.00 160,420.00
SUB TOTAL Rp 6,475,220.00

X. PEKERJAAN INSTALASI AIR


1 Pas. Kloset Jongkok 3.00 Bh 589,700.00 1,769,100.00
2 Pas. Floor Drain 4.00 Bh 28,000.00 112,000.00
3 Pas. Kran Air 3/4" 5.00 Bh 29,000.00 145,000.00
4 Pas. Pipa Air Bersih Type PVC AW 3/4" 70.00 Bh 67,881.00 4,751,670.00
5 Pas. Pipa Air Kotor Type PVC AW 1/2" 20.00 Bh 56,256.00 1,125,120.00
6 Pas. Septictank dan Peresapan 2.00 Ls 4,000,000.00 8,000,000.00
SUB TOTAL Rp 15,902,890.00

XI. PEKERJAAN AKHIR


1 Pembersihan Akhir (Finishing) 1.00 Ls 4,300,000.00 4,300,000.00

SUB TOTAL Rp 4,300,000.00


TOTAL HARGA Rp 677,304,427.52
KEGIATAN : PEMBANGUNAN REHAB RUMAH DINAS
LOKASI : WAISAI, DISTRIK WAISAI KOTA
TAHUN ANGGARAN :2013

DAFTAR ANALISA HARGA SATUAN

I. PEKERJAAN PERSIAPAN
1 m' Pengukuran dan pemasangan bouwplank
A. MATERIAL
Kayu 5/10 klas II 0.012 m3 Rp. 1,650,000.00 = Rp. 19,800.00
Paku biasa 0.200 Kg Rp. 22,500.00 = Rp. 4,500.00
Kayu papan 3/20 0.007 m3 Rp. 1,650,000.00 = Rp. 11,550.00
Jumlah ( 1 ) = Rp. 35,850.00
B. TENAGA
Pekerja 0.100 Oh Rp. 80,000.00 = Rp. 8,000.00
Tukang kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala Tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 19,700.00
Jumlah ( 1 ) + ( 2 ) Rp. 55,550.00
1m2 Membersihkan lapangan dan Perataan
A. TENAGA
Pekerja 0.100 Oh Rp. 80,000.00 = Rp 8,000.00
Mandor 0.050 Oh Rp. 120,000.00 = Rp 6,000.00
Jumlah ( 1 ) = Rp 14,000.00

II. PEKERJAAN TANAH DAN PONDASI


1 m3 Galian Tanah Biasa sedalam 1 meter
A. TENAGA
Pekerja 0.400 Oh Rp. 80,000.00 = Rp. 32,000.00
Mandor 0.040 Oh Rp. 120,000.00 = Rp. 4,800.00
Jumlah ( 1 ) = Rp. 36,800.00
1 m3 Pasang pondasi batu gunung 1 Pc : 3 Ps
A. MATERIAL
Batu belah 15/20 1.100 m3 Rp. 420,000.00 = Rp. 462,000.00
Semen Portland 202.000 Kg Rp. 2,600.00 = Rp. 525,200.00
Pasir Pasang 0.485 m3 Rp. 420,000.00 = Rp. 203,700.00
Jumlah ( 1 ) = Rp. 1,190,900.00
B. TENAGA
Pekerja 1.500 Oh Rp. 80,000.00 = Rp. 120,000.00
Tukang batu 0.600 Oh Rp. 95,000.00 = Rp. 57,000.00
Kepala tukang 0.060 Oh Rp. 110,000.00 = Rp. 6,600.00
Mandor 0.075 Oh Rp. 120,000.00 = Rp. 9,000.00
Jumlah ( 2 ) Rp. 192,600.00
Jumlah ( 1 ) + ( 2 ) Rp. 1,383,500.00
1 m3 Pasang Pondasi batu kosong
A. MATERIAL
Batu belah 15/20 1.200 m3 Rp. 420,000.00 = Rp. 504,000.00
Pasir Urug 0.300 m3 Rp. 320,000.00 = Rp. 96,000.00
Jumlah ( 1 ) = Rp. 600,000.00
B. TENAGA
Pekerja 0.780 Oh Rp. 80,000.00 = Rp. 62,400.00
Tukang batu 0.390 Oh Rp. 95,000.00 = Rp. 37,050.00
Kepala tukang 0.039 Oh Rp. 110,000.00 = Rp. 4,290.00
Mandor 0.039 Oh Rp. 120,000.00 = Rp. 4,680.00
Jumlah ( 2 ) Rp. 108,420.00
Jumlah ( 1 ) + ( 2 ) Rp. 708,420.00
1 m3 Urugan pasir
A. MATERIAL
Pasir Urug 1.200 m3 Rp. 320,000.00 = Rp. 384,000.00
Jumlah ( 1 ) = Rp. 384,000.00
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Mandor 0.010 Oh Rp. 120,000.00 = Rp. 1,200.00
Jumlah ( 2 ) Rp. 25,200.00
Jumlah ( 1 ) + ( 2 ) Rp. 409,200.00
1 m3 Urungan tanah kembali
TENAGA
Pekerja 0.192 Oh Rp. 80,000.00 = Rp. 15,360.00
Mandor 0.019 Oh Rp. 120,000.00 = Rp. 2,280.00
Jumlah = Rp. 17,640.00

1 m3 Urugan tanah dan pemadatan


A. MATERIAL
Tanah urug 1.200 m3 Rp. 108,000.00 = Rp. 129,600.00
Jumlah ( 1 ) = Rp. 129,600.00
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Mandor 0.010 Oh Rp. 120,000.00 = Rp. 1,200.00
Jumlah ( 2 ) Rp. 25,200.00
Pemadatan
Pekerja 0.500 Oh Rp. 80,000.00 = Rp. 40,000.00
Mandor 0.050 Oh Rp. 120,000.00 = Rp. 6,000.00
Jumlah ( 2 ) Rp. 46,000.00

Urugan tanah + pemadatan = Rp. 200,800.00

III. PEKERJAAN BETON


1 m3 Membuat beton tumbuk 1Pc : 3Ps : 5Kr
A. MATERIAL
Semen Pc 218.000 Kg Rp. 2,600.00 = Rp. 566,800.00
3
Pasir beton 0.520 M Rp. 420,000.00 = Rp. 218,400.00
Kerikil 2/3 0.870 M3 Rp. 750,000.00 = Rp. 652,500.00
Jumlah ( 1 ) = Rp. 1,437,700.00
B. TENAGA
Pekerja 1.650 Oh Rp. 80,000.00 = Rp. 132,000.00
Tukang Batu 0.250 Oh Rp. 95,000.00 = Rp. 23,750.00
Kepala Tukang Batu 0.025 Oh Rp. 110,000.00 = Rp. 2,750.00
Mandor 0.080 Oh Rp. 120,000.00 = Rp. 9,600.00
Jumlah ( 2 ) = Rp. 168,100.00
Jumlah ( 1 ) + ( 2 ) = Rp. 1,605,800.00

1 m2 beton tumbuk 1 : 3 : 5 ( tebal = 7 cm ) = 112,406.00

1 m3 Membuat beton bertulang 1 : 2 : 3


A. MATERIAL
Semen Pc 232.000 Kg Rp. 2,600.00 = Rp. 603,200.00
Pasir beton 0.520 M3 Rp. 420,000.00 = Rp. 218,400.00
3
Kerikil 2/3 0.780 M Rp. 750,000.00 = Rp. 585,000.00
Jumlah ( A ) = Rp. 1,406,600.00
B. TENAGA
Pekerja 1.650 Oh Rp. 80,000.00 = Rp. 132,000.00
Tukang Batu 0.250 Oh Rp. 95,000.00 = Rp. 23,750.00
Kepala Tukang Batu 0.025 Oh Rp. 110,000.00 = Rp. 2,750.00
Mandor 0.080 Oh Rp. 120,000.00 = Rp. 9,600.00
Jumlah ( B ) Rp. 168,100.00

C. 1 kg pembesian besi beton


besi beton 1.050 kg Rp. 16,115.33 = Rp. 16,921.10
kawat ikat 0.015 kg Rp. 35,000.00 = Rp. 525.00
tukang besi 0.007 Oh Rp. 95,000.00 = Rp. 665.00
pekeja 0.007 Oh Rp. 80,000.00 = Rp. 560.00
Kepala Tukang Batu 0.0007 Oh Rp. 110,000.00 = Rp. 77.00
Mandor 0.0003 Oh Rp. 120,000.00 = Rp. 36.00
Jumlah ( C ) Rp. 18,784.10

120 kg pekerjaan besi = 2,254,091.90

D. BEGESTING
Papan begesting 0.045 kg Rp. 1,650,000.00 = Rp. 74,250.00
Paku 0.300 kg Rp. 22,500.00 = Rp. 6,750.00
Tukang kayu 0.260 Oh Rp. 100,000.00 = Rp. 26,000.00
Kepala tukang 0.026 Oh Rp. 110,000.00 = Rp. 2,860.00
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( C ) Rp. 134,460.00

BETON BERTULANG 1 : 2 : 3 (A + B + C + D) = 3,963,251.90

1m3 Membuat Sloef beton bertulang ( 105 kg besi + bekisting )


A. MATERIAL
Papan Kayu Klas II 0.270 m3 Rp. 1,650,000.00 = Rp. 445,500.00
Paku Biasa 2.000 Kg Rp. 22,500.00 = Rp. 45,000.00
Minyak Bekisting 0.600 Liter Rp. 5,600.00 = Rp. 3,360.00
Besi Beton Polos 110.250 Kg Rp. 16,115.33 = Rp. 1,776,715.41
Kawat Beton 1.575 Kg Rp. 35,000.00 = Rp. 55,125.00
Semen Portland 336.000 Kg Rp. 2,600.00 = Rp. 873,600.00
Pasir Beton 0.540 m3 Rp. 420,000.00 = Rp. 226,800.00
Kerikil 0.810 m3 Rp. 750,000.00 = Rp. 607,500.00
Jumlah ( 1 ) = Rp. 4,033,600.41
B. TENAGA
Pekerja 5.650 Oh Rp. 80,000.00 = Rp. 452,000.00
Tukang Batu 0.275 Oh Rp. 95,000.00 = Rp. 26,125.00
Tukang Kayu 1.560 Oh Rp. 100,000.00 = Rp. 156,000.00
Tukang Besi 0.735 Oh Rp. 95,000.00 = Rp. 69,825.00
Kepala Tukang 0.323 Oh Rp. 110,000.00 = Rp. 35,530.00
Mandor 0.283 Oh Rp. 120,000.00 = Rp. 33,960.00
Jumlah ( 2 ) = Rp. 773,440.00
Jumlah ( 1 ) + ( 2 ) = Rp. 4,807,040.41

1m3 Membuat kolom beton bertulang ( 150 kg besi + bekisting )


A. MATERIAL
Papan Kayu Klas II 0.320 m3 Rp. 1,650,000.00 = Rp. 528,000.00
Paku Biasa 3.200 Kg Rp. 22,500.00 = Rp. 72,000.00
Minyak Bekisting 1.600 Liter Rp. 5,600.00 = Rp. 8,960.00
Besi Beton Polos 157.500 Kg Rp. 16,115.33 = Rp. 2,538,164.87
Kawat Beton 2.250 Kg Rp. 35,000.00 = Rp. 78,750.00
Semen Portland 336.000 Kg Rp. 2,600.00 = Rp. 873,600.00
Pasir Beton 0.540 m3 Rp. 420,000.00 = Rp. 226,800.00
Kerikil 0.810 m3 Rp. 750,000.00 = Rp. 607,500.00
Balok Kayu Klass II 0.120 m3 Rp. 1,650,000.00 = Rp. 198,000.00
Jumlah ( 1 ) = Rp. 5,131,774.87
B. TENAGA
Pekerja 5.300 Oh Rp. 80,000.00 = Rp. 424,000.00
Tukang Batu 0.275 Oh Rp. 95,000.00 = Rp. 26,125.00
Tukang Kayu 1.300 Oh Rp. 100,000.00 = Rp. 130,000.00
Tukang Besi 1.050 Oh Rp. 95,000.00 = Rp. 99,750.00
Kepala Tukang 0.265 Oh Rp. 110,000.00 = Rp. 29,150.00
Mandor 0.265 Oh Rp. 120,000.00 = Rp. 31,800.00
Jumlah ( 2 ) = Rp. 740,825.00
Jumlah ( 1 ) + ( 2 ) = Rp. 5,872,599.87

1m3 Membuat Balok beton bertulang ( 200 kg besi + bekisting )


A. MATERIAL
Papan Kayu Klas II 0.320 m3 Rp. 1,650,000.00 = Rp. 528,000.00
Paku 5cm-12cm 3.200 Kg Rp. 22,500.00 = Rp. 72,000.00
Minyak Bekisting 1.600 Liter Rp. 5,600.00 = Rp. 8,960.00
Besi Beton Polos 210.000 Kg Rp. 16,115.33 = Rp. 3,384,219.83
Kawat Beton 3.000 Kg Rp. 35,000.00 = Rp. 105,000.00
Semen Portland 336.000 Kg Rp. 2,600.00 = Rp. 873,600.00
Pasir Beton 0.540 m3 Rp. 420,000.00 = Rp. 226,800.00
Kerikil 0.810 m3 Rp. 750,000.00 = Rp. 607,500.00
Balok Kayu Matoa 0.140 m3 Rp. 1,650,000.00 = Rp. 231,000.00
Jumlah ( 1 ) = Rp. 6,037,079.83
B. TENAGA
Pekerja 7.050 Oh Rp. 80,000.00 = Rp. 564,000.00
Tukang Batu 0.275 Oh Rp. 95,000.00 = Rp. 26,125.00
Tukang Kayu 1.650 Oh Rp. 100,000.00 = Rp. 165,000.00
Tukang Besi 2.100 Oh Rp. 95,000.00 = Rp. 199,500.00
Kepala Tukang 0.403 Oh Rp. 110,000.00 = Rp. 44,330.00
Mandor 0.353 Oh Rp. 120,000.00 = Rp. 42,360.00
Jumlah ( 2 ) = Rp. 1,041,315.00
Jumlah ( 1 ) + ( 2 ) = Rp. 7,078,394.83

1m3 Membuat Ringbalk beton bertulang ( 270 kg besi + bekisting )


A. MATERIAL
Papan Kayu Klas II 0.320 m3 Rp. 1,650,000.00 = Rp. 528,000.00
Paku 5cm-12cm 3.200 Kg Rp. 22,500.00 = Rp. 72,000.00
Minyak Bekisting 1.600 Liter Rp. 5,600.00 = Rp. 8,960.00
Besi Beton Polos 283.500 Kg Rp. 16,115.33 = Rp. 4,568,696.77
Kawat Beton 4.050 Kg Rp. 35,000.00 = Rp. 141,750.00
Semen Portland 336.000 Kg Rp. 2,600.00 = Rp. 873,600.00
Pasir Beton 0.540 m3 Rp. 420,000.00 = Rp. 226,800.00
3
Kerikil 0.810 m Rp. 750,000.00 = Rp. 607,500.00
Balok Kayu Matoa 0.140 m3 Rp. 1,650,000.00 = Rp. 231,000.00
Jumlah ( 1 ) = Rp. 7,258,306.77
B. TENAGA
Pekerja 7.050 Oh Rp. 80,000.00 = Rp. 564,000.00
Tukang Batu 0.275 Oh Rp. 95,000.00 = Rp. 26,125.00
Tukang Kayu 1.650 Oh Rp. 100,000.00 = Rp. 165,000.00
Tukang Besi 2.835 Oh Rp. 95,000.00 = Rp. 269,325.00
Kepala Tukang 0.403 Oh Rp. 110,000.00 = Rp. 44,330.00
Mandor 0.353 Oh Rp. 120,000.00 = Rp. 42,360.00
Jumlah ( 2 ) = Rp. 1,111,140.00
Jumlah ( 1 ) + ( 2 ) = Rp. 8,369,446.77

IV. PEKERJAAN DINDING DAN LANTAI


Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 Pc : 2 Pp
A. MATERIAL
Bata merah 70.000 Bh Rp. 2,500.00 = Rp. 175,000.00
Semen portland 18.950 Kg Rp. 3,250.00 = Rp. 61,587.50
3
Pasir pasang 0.0380 m Rp. 420,000.00 = Rp. 15,960.00
Jumlah ( 1 ) Rp. 252,547.50
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Tukang batu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 36,400.00
Jumlah ( 1 ) + ( 2 ) Rp. 288,947.50
2
Memasang 1 m dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 Pc : 4 Pp
A. MATERIAL
Bata merah 70.000 Bh Rp. 2,500.00 = Rp. 175,000.00
Semen portland 11.500 Kg Rp. 2,600.00 = Rp. 29,900.00
3
Pasir pasang 0.043 m Rp. 420,000.00 = Rp. 18,060.00
Jumlah ( 1 ) Rp. 222,960.00
B. TENAGA
Pekerja 0.320 Oh Rp. 80,000.00 = Rp. 25,600.00
Tukang batu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 38,000.00
Jumlah ( 1 ) + ( 2 ) Rp. 260,960.00
1 m2 Pekerjaan plesteran ,tebal 15mm 1Pc : 2 Ps
A. MATERIAL
Semen portland 10.224 Kg Rp. 2,600.00 = Rp. 26,582.40
Pasir pasang 0.020 m3 Rp. 420,000.00 = Rp. 8,400.00
Acian = Rp. 36,250.00
Jumlah ( 1 ) Rp. 71,232.40
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Tukang batu 0.150 Oh Rp. 95,000.00 = Rp. 14,250.00
Kepala tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 41,700.00
Jumlah ( 1 ) + ( 2 ) Rp. 112,932.40

1 m2 Pekerjaan plesteran ,tebal 15mm 1Pc : 4 Ps


A. MATERIAL
Semen portland 6.240 Kg Rp. 2,600.00 = Rp. 16,224.00
Pasir pasang 0.024 m3 Rp. 420,000.00 = Rp. 10,080.00
Acian = Rp. 36,250.00
Jumlah ( 1 ) Rp. 62,554.00
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Tukang batu 0.150 Oh Rp. 95,000.00 = Rp. 14,250.00
Kepala tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 41,700.00
Jumlah ( 1 ) + ( 2 ) Rp. 104,254.00
1 m2 Pekerjaan acian dinding
A. MATERIAL
Semen portland 3.250 Kg Rp. 2,600.00 = Rp. 8,450.00
Jumlah ( 1 ) Rp. 8,450.00
B. TENAGA
Pekerja 0.200 Oh Rp. 80,000.00 = Rp. 16,000.00
Tukang batu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.010 Oh Rp. 120,000.00 = Rp. 1,200.00
Jumlah ( 2 ) Rp. 27,800.00
Jumlah ( 1 ) + ( 2 ) Rp. 36,250.00
1 m3 Pasangan batu tela, 1Pc : 4Ps
A. MATERIAL
Batu tela lokal 20.000 Bh Rp. 2,500.00 = Rp. 50,000.00
Semen portland 11.500 Kg Rp. 2,600.00 = Rp. 29,900.00
Pasir pasang 0.043 m3 Rp. 420,000.00 = Rp. 18,060.00
Jumlah ( 1 ) Rp. 97,960.00
B. TENAGA
Pekerja 0.320 Oh Rp. 80,000.00 = Rp. 25,600.00
Tukang batu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 38,000.00
Jumlah ( 1 ) + ( 2 ) Rp. 135,960.00
1 m2 Pasangan batu tela tebal 1/4 bata, 1Pc : 2Ps
A. MATERIAL
Batu tela lokal 24.000 Bh Rp. 6,000.00 = Rp. 144,000.00
Semen portland 5.896 Kg Rp. 2,600.00 = Rp. 15,329.60
3
Pasir pasang 0.012 m Rp. 420,000.00 = Rp. 5,040.00
Jumlah ( 1 ) Rp. 164,369.60
B. TENAGA
Pekerja 0.320 Oh Rp. 80,000.00 = Rp. 25,600.00
Tukang batu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala tukang 0.010 Oh Rp. 120,000.00 = Rp. 1,200.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 38,100.00
Jumlah ( 1 ) + ( 2 ) Rp. 202,469.60

1 m2 Pasangan batu tela tebal 1/4 bata, 1Pc : 4Ps


A. MATERIAL
Batu tela lokal 24.000 Bh Rp. 6,000.00 = Rp. 144,000.00
Semen portland 3.578 Kg Rp. 2,600.00 = Rp. 9,302.80
Pasir pasang 0.013 m3 Rp. 420,000.00 = Rp. 5,460.00
Jumlah ( 1 ) Rp. 158,762.80
B. TENAGA
Pekerja 0.320 Oh Rp. 80,000.00 = Rp. 25,600.00
Tukang batu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala tukang 0.010 Oh Rp. 120,000.00 = Rp. 1,200.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 38,100.00
Jumlah ( 1 ) + ( 2 ) Rp. 196,862.80

1 m2 Pekerjaan plesteran ,tebal 15mm 1Pc : 2 Ps


A. MATERIAL
Semen portland 10.224 Kg Rp. 2,600.00 = Rp. 26,582.40
Pasir pasang 0.020 m3 Rp. 420,000.00 = Rp. 8,400.00
Jumlah ( 1 ) Rp. 34,982.40
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Tukang batu 0.150 Oh Rp. 95,000.00 = Rp. 14,250.00
Kepala tukang 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 41,850.00
Jumlah ( 1 ) + ( 2 ) Rp. 76,832.40
2
1 m Pekerjaan plesteran ,tebal 15mm 1Pc : 4 Ps
A. MATERIAL
Semen portland 6.240 Kg Rp. 2,600.00 = Rp. 16,224.00
Pasir pasang 0.024 m3 Rp. 420,000.00 = Rp. 10,080.00
Jumlah ( 1 ) Rp. 26,304.00
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Tukang batu 0.150 Oh Rp. 95,000.00 = Rp. 14,250.00
Kepala tukang 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 41,850.00
Jumlah ( 1 ) + ( 2 ) Rp. 68,154.00
2
1 m Lambisering dan Rangka
A. MATERIAL
Kayu klas II 0.0120 M3 Rp. 2,750,000.00 = Rp. 33,000.00
Papan Kayu Klas II 2/10 0.0200 M3 Rp. 2,750,000.00 = Rp. 55,000.00
Paku 0.4400 Kg Rp. 27,500.00 = Rp. 12,100.00
Jumlah ( 1 ) Rp. 100,100.00
B. TENAGA
Pekerja 0.2800 Oh Rp. 80,000.00 = Rp. 22,400.00
Tukang kayu 0.8000 Oh Rp. 100,000.00 = Rp. 80,000.00
Kepala tukang 0.0800 Oh Rp. 110,000.00 = Rp. 8,800.00
Mandor 0.0140 Oh Rp. 120,000.00 = Rp. 1,680.00
1/2 Upah Kerja 0.5000 Jumlah ( 2 ) 56,440.00
Jumlah ( 1 ) + ( 2 ) Rp. 156,540.00

VIII. PEKERJAAN LANTAI


1 m2 Pemasangan Keramik 40 x 40
A. MATERIAL
Ubin Keramik 40x40 1.000 Doz Rp. 75,000.00 = Rp. 75,000.00
Semen Portland 10.000 Kg Rp. 2,600.00 = Rp. 26,000.00
Pasir pasang 0.045 m3 Rp. 420,000.00 = Rp. 18,900.00
Semen Warna 1.500 Kg Rp. 20,000.00 = Rp. 30,000.00
Jumlah ( 1 ) Rp. 149,900.00
B. TENAGA
Pekerja 0.700 Oh Rp. 80,000.00 = Rp. 56,000.00
Tukang Batu 0.350 Oh Rp. 95,000.00 = Rp. 33,250.00
Kepala Tukang 0.035 Oh Rp. 110,000.00 = Rp. 3,850.00
Mandor 0.035 Oh Rp. 120,000.00 = Rp. 4,200.00
Jumlah ( 2 ) Rp. 97,300.00
Jumlah ( 1 ) + ( 2 ) Rp. 247,200.00
1 m2 Pemasangan Keramik 20x20
A. MATERIAL
Ubin Keramik 20x20 1.000 Doz Rp. 65,000.00 = Rp. 65,000.00
Semen Portland 10.400 Kg Rp. 2,600.00 = Rp. 27,040.00
Pasir pasang 0.045 m3 Rp. 420,000.00 = Rp. 18,900.00
Semen Warna 1.620 Kg Rp. 20,000.00 = Rp. 32,400.00
Jumlah ( 1 ) Rp. 143,340.00
B. TENAGA
Pekerja 0.700 Oh Rp. 80,000.00 = Rp. 56,000.00
Tukang Batu 0.350 Oh Rp. 95,000.00 = Rp. 33,250.00
Kepala Tukang 0.035 Oh Rp. 110,000.00 = Rp. 3,850.00
Mandor 0.035 Oh Rp. 120,000.00 = Rp. 4,200.00
Jumlah ( 2 ) Rp. 97,300.00
Jumlah ( 1 ) + ( 2 ) Rp. 240,640.00
1 m2 Pemasangan Dinding Keramik 20x25
A. MATERIAL
Ubin Keramik 20x25 1.000 Doz Rp. 65,000.00 = Rp. 65,000.00
Semen Portland 9.300 Kg Rp. 2,600.00 = Rp. 24,180.00
Pasir pasang 0.018 m3 Rp. 420,000.00 = Rp. 7,560.00
Semen Warna 1.940 Kg Rp. 20,000.00 = Rp. 38,800.00
Jumlah ( 1 ) Rp. 135,540.00
B. TENAGA
Pekerja 0.900 Oh Rp. 80,000.00 = Rp. 72,000.00
Tukang Batu 0.450 Oh Rp. 95,000.00 = Rp. 42,750.00
Kepala Tukang 0.045 Oh Rp. 110,000.00 = Rp. 4,950.00
Mandor 0.045 Oh Rp. 120,000.00 = Rp. 5,400.00
Jumlah ( 2 ) Rp. 125,100.00
Jumlah ( 1 ) + ( 2 ) Rp. 260,640.00

VI. PEKERJAAN ATAP DAN PLAFOND


1 m3 Pasang konstruksi kuda-kuda kayu klas I
A. MATERIAL
Kayu Kelas I, balok 1.100 m3 Rp. 2,750,000.00 = Rp. 3,025,000.00
Paku biasa 5.600 Kg Rp. 22,500.00 = Rp. 126,000.00
Jumlah ( 1 ) Rp. 3,151,000.00
B. TENAGA
Pekerja 4.000 Oh Rp. 80,000.00 = Rp. 320,000.00
Tukang kayu 12.000 Oh Rp. 100,000.00 = Rp. 1,200,000.00
Kepala tukang 1.200 Oh Rp. 110,000.00 = Rp. 132,000.00
Mandor 0.200 Oh Rp. 120,000.00 = Rp. 24,000.00
Jumlah ( 2 ) Rp. 1,676,000.00
Jumlah ( 1 ) + ( 2 ) Rp. 4,827,000.00
Memasang 1 m2 Rangka Atap Genteng Metal, Kayu Kelas I
A. Material
Kaso-Kaso 5/7 Kayu Matoa 0.014 m3 Rp. 2,750,000.00 = Rp. 38,500.00
Reng 3/4 Kayu Matoa 0.057 m3 Rp. 2,750,000.00 = Rp. 156,750.00
Paku 5cm-10cm 0.250 Kg Rp. 22,500.00 = Rp. 5,625.00
Jumlah ( 1 ) = Rp. 200,875.00
B. TENAGA
Pekerja 0.100 Oh Rp. 80,000.00 = Rp. 8,000.00
Tukang Kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala Tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 19,700.00
Jumlah ( 1 ) + ( 2 ) Rp. 220,575.00
1 m3 Kontruksi Tiang Kayu klas I
A. MATERIAL
Balok Kayu Klas I 1.100 m3 Rp. 2,750,000.00 = Rp. 3,025,000.00
Baut Diameter 19 mm 4.000 bh Rp. 15,000.00 = Rp. 60,000.00
Paku Biasa 3.000 Kg Rp. 22,500.00 = Rp. 67,500.00
Jumlah ( 1 ) Rp. 3,152,500.00
B. TENAGA
Pekerja 4.000 Oh Rp. 80,000.00 = Rp. 320,000.00
Tukang kayu 12.000 Oh Rp. 100,000.00 = Rp. 1,200,000.00
Kepala tukang 1.200 Oh Rp. 110,000.00 = Rp. 132,000.00
Mandor 0.200 Oh Rp. 120,000.00 = Rp. 24,000.00
Jumlah ( 2 ) Rp. 1,676,000.00
Jumlah ( 1 ) + ( 2 ) Rp. 4,828,500.00

1 m3 Pasang Gording kayu klas I


A. MATERIAL
Kayu Kelas I 1.100 m3 Rp. 2,750,000.00 = Rp. 3,025,000.00
Paku biasa 3.000 Kg Rp. 22,500.00 = Rp. 67,500.00
Jumlah ( 1 ) Rp. 3,092,500.00
B. TENAGA
Pekerja 2.400 Oh Rp. 80,000.00 = Rp. 192,000.00
Tukang kayu 7.200 Oh Rp. 100,000.00 = Rp. 720,000.00
Kepala tukang 0.720 Oh Rp. 110,000.00 = Rp. 79,200.00
Mandor 0.120 Oh Rp. 120,000.00 = Rp. 14,400.00
Jumlah ( 2 ) Rp. 1,005,600.00
Jumlah ( 1 ) + ( 2 ) Rp. 4,098,100.00
2
1 m Pemasangan Rangka Atap Genteng Metal, Kayu Klas I
A. MATERIAL
Kaso-Kaso 5/7 Kayu Klas I 0.014 m3 Rp. 2,640,000.00 = Rp. 36,960.00
Reng 2/3 Kayu Klas I 0.057 m3 Rp. 2,640,000.00 = Rp. 150,480.00
Paku Biasa 0.250 Kg Rp. 22,500.00 = Rp. 5,625.00
Jumlah ( 1 ) Rp. 193,065.00
B. TENAGA
Pekerja 0.100 Oh Rp. 80,000.00 = Rp. 8,000.00
Tukang kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 19,700.00
Jumlah ( 1 ) + ( 2 ) Rp. 212,765.00
1 m2 Pemasangan Atap Genteng Metal
A. MATERIAL
Genteng Metal 1.710 Lbr Rp. 54,000.00 = Rp. 92,340.00
Paku Genteng Metal 0.200 Kg Rp. 48,000.00 = Rp. 9,600.00
Jumlah ( 1 ) Rp. 101,940.00
B. TENAGA
Pekerja 0.200 Oh Rp. 80,000.00 = Rp. 16,000.00
Tukang Kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala Tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.001 Oh Rp. 120,000.00 = Rp. 120.00
Jumlah ( 2 ) Rp. 27,220.00
Jumlah ( 1 ) + ( 2 ) Rp. 129,160.00
1 m' Pemasangan nok Genteng Metal
A. MATERIAL
Nok Genteng Metal 1.100 Lbr Rp. 42,000.00 = Rp. 46,200.00
Paku Gentel Metal 0.050 Kg Rp. 48,000.00 = Rp. 2,400.00
Jumlah ( 1 ) Rp. 48,600.00
B. TENAGA
Pekerja 0.250 Oh Rp. 80,000.00 = Rp. 20,000.00
Tukang Kayu 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 38,210.00
Jumlah ( 1 ) + ( 2 ) Rp. 86,810.00

1 m3 Pekerjaan Kasau + Reng Atap Multiroof


A. MATERIAL
Kayu Kelas II 0.165 m3 Rp. 2,750,000.00 = Rp. 453,750.00
Paku biasa 0.200 Kg Rp. 22,500.00 = Rp. 4,500.00
Jumlah ( 1 ) Rp. 458,250.00
B. TENAGA
Pekerja 0.120 Oh Rp. 80,000.00 = Rp. 9,600.00
Tukang kayu 0.120 Oh Rp. 100,000.00 = Rp. 12,000.00
Kepala tukang 0.012 Oh Rp. 110,000.00 = Rp. 1,320.00
Mandor 0.006 Oh Rp. 120,000.00 = Rp. 720.00
Jumlah ( 2 ) Rp. 23,640.00
Jumlah ( 1 ) + ( 2 ) Rp. 481,890.00

1 m2 Pemasangan Atap Seng Gelombang BJLS 30


A. MATERIAL
Seng Gelombang BJLS 30 mm 0.700 Lbr Rp. 75,000.00 = Rp. 52,500.00
Paku Seng 0.020 Kg Rp. 26,600.00 = Rp. 532.00
Jumlah ( 1 ) Rp. 53,032.00
B. TENAGA
Pekerja 0.120 Oh Rp. 80,000.00 = Rp. 9,600.00
Tukang Kayu 0.060 Oh Rp. 100,000.00 = Rp. 6,000.00
Kepala Tukang 0.006 Oh Rp. 110,000.00 = Rp. 660.00
Mandor 0.006 Oh Rp. 120,000.00 = Rp. 720.00
Jumlah ( 2 ) Rp. 16,980.00
Jumlah ( 1 ) + ( 2 ) Rp. 70,012.00
Memasang 1 m2 Atap Genteng Metal
A. Material
Genteng Metal 1.710 Lbr Rp. 45,000.00 = Rp. 76,950.00
Paku 5cm-12cm 0.200 Kg Rp. 26,600.00 = Rp. 5,320.00
Jumlah ( 1 ) = Rp. 82,270.00
B. TENAGA
Pekerja 0.200 Oh Rp. 80,000.00 = Rp. 16,000.00
Tukang Kayu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala Tukang 0.010 Oh Rp. 105,000.00 = Rp. 1,050.00
Mandor 0.001 Oh Rp. 115,000.00 = Rp. 115.00
Jumlah ( 2 ) Rp. 26,665.00
Jumlah ( 1 ) + ( 2 ) Rp. 108,935.00
Memasang 1 m' Nok Genteng Metal
A. Material
Genteng Decra Bond 1.100 Lbr Rp. 35,000.00 = Rp. 38,500.00
Paku 1cm-2,5cm 0.050 Kg Rp. 26,600.00 = Rp. 1,330.00
Jumlah ( 1 ) = Rp. 39,830.00
B. TENAGA
Pekerja 0.250 Oh Rp. 80,000.00 = Rp. 20,000.00
Tukang Kayu 0.150 Oh Rp. 95,000.00 = Rp. 14,250.00
Kepala Tukang 0.015 Oh Rp. 105,000.00 = Rp. 1,575.00
Mandor 0.013 Oh Rp. 115,000.00 = Rp. 1,495.00
Jumlah ( 2 ) Rp. 37,320.00
Jumlah ( 1 ) + ( 2 ) Rp. 77,150.00

1 m2 Pasang nok atap seng BJLS 20


A. MATERIAL
Bubung seng plat bjls 20 1.000 m' Rp. 22,500.00 = Rp. 22,500.00
Paku Seng 0.060 Kg Rp. 26,600.00 = Rp. 1,596.00
Jumlah ( 1 ) Rp. 24,096.00
B. TENAGA
Pekerja 0.150 Oh Rp. 80,000.00 = Rp. 12,000.00
Tukang kayu 0.070 Oh Rp. 100,000.00 = Rp. 7,000.00
Kepala tukang 0.008 Oh Rp. 110,000.00 = Rp. 880.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 20,480.00
Jumlah ( 1 ) + ( 2 ) Rp. 44,576.00
1 m2 Pasang talang datar atap seng BJLS 20
A. MATERIAL
Bubung seng plat bjls 20 1.000 m' Rp. 22,500.00 = Rp. 22,500.00
Paku Seng 0.060 Kg Rp. 26,600.00 = Rp. 1,596.00
Jumlah ( 1 ) Rp. 24,096.00
B. TENAGA
Pekerja 0.150 Oh Rp. 80,000.00 = Rp. 12,000.00
Tukang kayu 0.070 Oh Rp. 100,000.00 = Rp. 7,000.00
Kepala tukang 0.008 Oh Rp. 110,000.00 = Rp. 880.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 20,480.00
Jumlah ( 1 ) + ( 2 ) Rp. 44,576.00
1 m' Pasang Listplank , Kayu Klas I
A. MATERIAL
Papan Kayu Besi 0.011 m3 Rp. 2,750,000.00 = Rp. 29,700.00
Paku Biasa 0.050 Kg Rp. 22,500.00 = Rp. 1,125.00
Jumlah ( 1 ) Rp. 30,825.00
B. TENAGA
Pekerja 0.100 Oh Rp. 80,000.00 = Rp. 8,000.00
Tukang kayu 0.200 Oh Rp. 100,000.00 = Rp. 20,000.00
Kepala tukang 0.020 Oh Rp. 110,000.00 = Rp. 2,200.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 30,800.00
Jumlah ( 1 ) + ( 2 ) Rp. 61,625.00

1 m2 Pasang Plafond Tripleks T = 4 mm + Rangka Kayu


A. MATERIAL
Tripleks 4 mm 0.336 Lbr Rp. 85,000.00 = Rp. 28,560.00
Paku tripleks 0.020 Kg Rp. 27,500.00 = Rp. 550.00
Paku biasa 0.200 Kg Rp. 22,500.00 = Rp. 4,500.00
Kayu Kelas II, balok 0.012 m3 Rp. 1,650,000.00 = Rp. 19,800.00
Jumlah ( 1 ) Rp. 19,800.00
B. TENAGA
Pekerja 0.280 Oh Rp. 80,000.00 = Rp. 22,400.00
Tukang kayu 0.800 Oh Rp. 100,000.00 = Rp. 80,000.00
Kepala tukang 0.080 Oh Rp. 110,000.00 = Rp. 8,800.00
Mandor 0.014 Oh Rp. 120,000.00 = Rp. 1,680.00
@ 3/4 Upah Kerja 0.750 Rp. 112,880.00 = Rp. 84,660.00
Jumlah ( 2 ) Rp. 84,660.00
Jumlah ( 1 ) + ( 2 ) Rp. 104,460.00
1 m' List Langit-Langit Kayu Profil
A. MATERIAL
List Profil 4cm 1.050 m' Rp. 17,500.00 = Rp. 18,375.00
Paku Biasa 0.010 Kg Rp. 22,500.00 = Rp. 225.00
Jumlah ( 1 ) Rp. 18,600.00
B. TENAGA
Pekerja 0.050 Oh Rp. 80,000.00 = Rp. 4,000.00
Tukang kayu 0.050 Oh Rp. 100,000.00 = Rp. 5,000.00
Kepala tukang 0.005 Oh Rp. 110,000.00 = Rp. 550.00
Mandor 0.0030 Oh Rp. 120,000.00 = Rp. 360.00
Jumlah ( 2 ) Rp. 9,910.00
Jumlah ( 1 ) + ( 2 ) Rp. 28,510.00

V. PEKERJAAN PINTU DAN JENDELA


1 m3 Pekerjaan pasang kusen pintu dan jendela kayu klas 1
A. MATERIAL
Kayu Klas I, balok 0.060 m3 Rp. 2,750,000.00 = Rp. 165,000.00
Paku Biasa 0.150 Kg Rp. 22,500.00 = Rp. 3,375.00
Lem Kayu 0.500 Kg Rp. 22,500.00 = Rp. 11,250.00
Jumlah ( 1 ) Rp. 179,625.00
B. TENAGA
Pekerja 0.500 Oh Rp. 80,000.00 = Rp. 40,000.00
Tukang kayu 2.000 Oh Rp. 100,000.00 = Rp. 200,000.00
Kepala tukang 2.000 Oh Rp. 110,000.00 = Rp. 220,000.00
Mandor 0.025 Oh Rp. 120,000.00 = Rp. 3,000.00
Jumlah ( 2 ) Rp. 463,000.00
Jumlah ( 1 ) + ( 2 ) Rp. 642,625.00
1m2 Pasang pintu panel
A. MATERIAL
Kayu papan kelas I 0.060 M3 Rp. 2,750,000.00 = Rp. 165,000.00
Lem Kayu 0.500 Kg Rp. 22,500.00 = Rp. 11,250.00
Jumlah ( 1 ) Rp. 176,250.00
B. TENAGA
Pekerja 1.000 Oh Rp. 80,000.00 = Rp. 80,000.00
Tukang kayu 2.500 Oh Rp. 100,000.00 = Rp. 250,000.00
Kepala tukang 0.250 Oh Rp. 110,000.00 = Rp. 27,500.00
Mandor 0.050 Oh Rp. 120,000.00 = Rp. 6,000.00
Jumlah ( 2 ) Rp. 363,500.00
Jumlah ( 1 ) + ( 2 ) Rp. 539,750.00

1m2 Pasang pintu panel papan kayu besi lapis seng plat
A. MATERIAL
Kayu papan kelas I 0.033 M3 Rp. 2,750,000.00 = Rp. 90,750.00
Paku Biasa 0.025 Kg Rp. 22,500.00 = Rp. 562.50
Seng Plat BJLS 0.20 1.100 M2 Rp. 22,500.00 = Rp. 24,750.00
Jumlah ( 1 ) Rp. 116,062.50
B. TENAGA
Pekerja 2.500 Oh Rp. 80,000.00 = Rp. 200,000.00
Tukang kayu 7.500 Oh Rp. 100,000.00 = Rp. 750,000.00
Kepala tukang 0.750 Oh Rp. 110,000.00 = Rp. 82,500.00
Mandor 0.125 Oh Rp. 120,000.00 = Rp. 15,000.00
@ 3/4 x Upah Kerja 0.750 Rp. 1,047,500.00 = Rp. 785,625.00
Jumlah ( 2 ) Rp. 785,625.00
Jumlah ( 1 ) + ( 2 ) Rp. 901,687.50
2
1 m Pasang jendela kayu klas 1 + kaca riben 5mm
A. MATERIAL
Kayu papan kelas I 0.024 m3 Rp. 2,750,000.00 = Rp. 66,000.00
Lem Kayu 0.300 Kg Rp. 22,500.00 = Rp. 6,750.00
2
Kaca riben 7-10 mm 0.663 m Rp. 285,000.00 = Rp. 188,955.00
Jumlah ( 1 ) Rp. 261,705.00
B. TENAGA
Pekerja 0.800 Oh Rp. 80,000.00 = Rp. 64,000.00
Tukang kayu 2.400 Oh Rp. 100,000.00 = Rp. 240,000.00
Kepala tukang 0.240 Oh Rp. 110,000.00 = Rp. 26,400.00
Mandor 0.040 Oh Rp. 120,000.00 = Rp. 4,800.00
Jumlah ( 2 ) Rp. 335,200.00
Jumlah ( 1 ) + ( 2 ) Rp. 596,905.00
1 m2 Pasang kaca mati ryben 5mm
A. MATERIAL
Kaca ryben 1.100 m2 Rp. 285,000.00 = Rp. 313,500.00
Jumlah ( 1 ) Rp. 313,500.00
B. TENAGA
Pekerja 0.015 Oh Rp. 80,000.00 = Rp. 1,200.00
Tukang kaca 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.001 Oh Rp. 120,000.00 = Rp. 90.00
Jumlah ( 2 ) Rp. 17,940.00
Jumlah ( 1 ) + ( 2 ) Rp. 331,440.00
1 m2 Pasang Jalusi Kusen Kayu Klas I
A. MATERIAL
Papan Kayu Besi 0.060 m3 Rp. 2,750,000.00 = Rp. 165,000.00
Paku Biasa 0.150 Kg Rp. 22,500.00 3,375.00
Jumlah ( 1 ) Rp. 168,375.00
B. TENAGA
Pekerja 0.670 Oh Rp. 80,000.00 = Rp. 53,600.00
Tukang kayu 2.000 Oh Rp. 100,000.00 = Rp. 200,000.00
Kepala tukang 0.200 Oh Rp. 110,000.00 = Rp. 22,000.00
Mandor 0.335 Oh Rp. 120,000.00 = Rp. 40,200.00
Jumlah ( 2 ) Rp. 315,800.00
Jumlah ( 1 ) + ( 2 ) Rp. 484,175.00

VII. PEKERJAAN PENGECATAN


1 m2 Pengecetan tembok baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
A. MATERIAL
Plamur tembok 0.100 Kg Rp. 70,000.00 = Rp. 7,000.00
Cat Dasar 0.100 Kg Rp. 10,660.00 = Rp. 1,066.00
Cat Penutup 2x 0.260 Kg Rp. 10,660.00 = Rp. 2,771.60
Jumlah ( 1 ) Rp. 10,837.60
B. TENAGA
Pekerja 0.020 Oh Rp. 80,000.00 = Rp. 1,600.00
Tukang cat 0.063 Oh Rp. 85,000.00 = Rp. 5,355.00
Kepala tukang 0.0063 Oh Rp. 110,000.00 = Rp. 693.00
Mandor 0.0025 Oh Rp. 120,000.00 = Rp. 300.00
Jumlah ( 2 ) Rp. 7,948.00
Jumlah ( 1 ) + ( 2 ) Rp. 18,785.60
1 m2 Pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
A. MATERIAL
Cat meni kayu 0.200 Kg Rp. 39,500.00 = Rp. 7,900.00
Plamur kayu 0.150 Kg Rp. 60,000.00 = Rp. 9,000.00
Cat dasar 0.170 Kg Rp. 39,500.00 = Rp. 6,715.00
Cat penutup 2 kali 0.260 Kg Rp. 39,500.00 = Rp. 10,270.00
Jumlah ( 1 ) Rp. 33,885.00
B. TENAGA
Pekerja 0.070 Oh Rp. 80,000.00 = Rp. 5,600.00
Tukang cat 0.009 Oh Rp. 85,000.00 = Rp. 765.00
Kepala tukang 0.006 Oh Rp. 110,000.00 = Rp. 660.00
Mandor 0.0025 Oh Rp. 120,000.00 = Rp. 300.00
Jumlah ( 2 ) Rp. 7,325.00
Jumlah ( 1 ) + ( 2 ) Rp. 41,210.00

1 m2 Pengecatan Meney Kayu Kusen


A. MATERIAL
Minyak Cat 0.057 Kg Rp. 32,500.00 = Rp. 1,852.50
Jumlah ( 1 ) Rp. 1,852.50
B. TENAGA
Pekerja 0.250 Oh Rp. 80,000.00 = Rp. 20,000.00
Tukang cat 0.340 Oh Rp. 85,000.00 = Rp. 28,900.00
Kepala tukang 0.034 Oh Rp. 110,000.00 = Rp. 3,740.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 54,440.00
Jumlah ( 1 ) + ( 2 ) Rp. 56,292.50

1 m2 Pengecetan Plafond baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
A. MATERIAL
Plamur Tembok 0.100 Kg Rp. 70,000.00 = Rp. 7,000.00
Cat Dasar 0.100 Kg Rp. 10,660.00 = Rp. 1,066.00
Cat Penutup 2x 0.250 Kg Rp. 10,660.00 = Rp. 2,665.00
Jumlah ( 1 ) Rp. 10,731.00
B. TENAGA
Pekerja 0.020 Oh Rp. 80,000.00 = Rp. 1,600.00
Tukang cat 0.063 Oh Rp. 85,000.00 = Rp. 5,355.00
Kepala tukang 0.0063 Oh Rp. 110,000.00 = Rp. 693.00
Mandor 0.0025 Oh Rp. 120,000.00 = Rp. 300.00
Jumlah ( 2 ) Rp. 7,948.00
Jumlah ( 1 ) + ( 2 ) Rp. 18,679.00
1 m2 Pengecetan Atap Seng Baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
A. MATERIAL
Cat Dasar 0.100 Kg Rp. 50,000.00 = Rp. 5,000.00
Cat Penutup 2x 0.250 Kg Rp. 50,000.00 = Rp. 12,500.00
Jumlah ( 1 ) Rp. 17,500.00
B. TENAGA
Pekerja 0.020 Oh Rp. 80,000.00 = Rp. 1,600.00
Tukang cat 0.063 Oh Rp. 85,000.00 = Rp. 5,355.00
Kepala tukang 0.0063 Oh Rp. 110,000.00 = Rp. 693.00
Mandor 0.0025 Oh Rp. 120,000.00 = Rp. 300.00
Jumlah ( 2 ) Rp. 7,948.00
Jumlah ( 1 ) + ( 2 ) Rp. 25,448.00

X. PEKERJAAN PENGGANTUNG DAN PENGUNCI


Memasang 1 buah Kunci Tanam Biasa
A. MATERIAL
Kunci Tanam Biasa 1.000 Bh Rp. 125,000.00 = Rp. 125,000.00
Jumlah ( 1 ) Rp. 125,000.00
B. TENAGA
Pekerja 0.010 Oh Rp. 80,000.00 = Rp. 800.00
Tukang kayu 0.500 Oh Rp. 100,000.00 = Rp. 50,000.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 52,500.00
Jumlah ( 1 ) + ( 2 ) Rp. 177,500.00

Memasang 1 buah Engsel Pintu


A. MATERIAL
Engsel Pintu 1.000 Bh Rp. 36,000.00 = Rp. 36,000.00
Jumlah ( 1 ) Rp. 36,000.00
B. TENAGA
Pekerja 0.015 Oh Rp. 80,000.00 = Rp. 1,200.00
Tukang kayu 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.00075 Oh Rp. 120,000.00 = Rp. 90.00
Jumlah ( 2 ) Rp. 17,940.00
Jumlah ( 1 ) + ( 2 ) Rp. 53,940.00
Memasang 1 buah Engsel Jendela
A. MATERIAL
Engsel Jendela 1.000 Bh Rp. 22,500.00 = Rp. 22,500.00
Jumlah ( 1 ) Rp. 22,500.00
B. TENAGA
Pekerja 0.010 Oh Rp. 80,000.00 = Rp. 800.00
Tukang kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.00050 Oh Rp. 120,000.00 = Rp. 60.00
Jumlah ( 2 ) Rp. 11,960.00
Jumlah ( 1 ) + ( 2 ) Rp. 34,460.00
Memasang 1 buah Grendel Pintu
A. MATERIAL
Grendel Pintu 1.000 Bh Rp. 21,000.00 = Rp. 21,000.00
Jumlah ( 1 ) Rp. 21,000.00
B. TENAGA
Pekerja 0.010 Oh Rp. 80,000.00 = Rp. 800.00
Tukang kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.00050 Oh Rp. 120,000.00 = Rp. 60.00
Jumlah ( 2 ) Rp. 11,960.00
Jumlah ( 1 ) + ( 2 ) Rp. 32,960.00
Memasang 1 buah Grendel Jendela
A. MATERIAL
Grendel Jendela 1.000 Bh Rp. 21,000.00 = Rp. 21,000.00
Jumlah ( 1 ) Rp. 21,000.00
B. TENAGA
Pekerja 0.010 Oh Rp. 80,000.00 = Rp. 800.00
Tukang kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.00050 Oh Rp. 120,000.00 = Rp. 60.00
Jumlah ( 2 ) Rp. 11,960.00
Jumlah ( 1 ) + ( 2 ) Rp. 32,960.00

Memasang 1 buah Hak angin


A. MATERIAL
Hak Angin 1.000 Bh Rp. 12,000.00 = Rp. 12,000.00
Jumlah ( 1 ) Rp. 12,000.00
B. TENAGA
Pekerja 0.020 Oh Rp. 80,000.00 = Rp. 1,600.00
Tukang kayu 0.200 Oh Rp. 100,000.00 = Rp. 20,000.00
Kepala tukang 0.020 Oh Rp. 110,000.00 = Rp. 2,200.00
Mandor 0.010 Oh Rp. 120,000.00 = Rp. 1,200.00
Jumlah ( 2 ) Rp. 25,000.00
Jumlah ( 1 ) + ( 2 ) Rp. 37,000.00

XI. PEKERJAAN INSTALASI LISTRIK


Memasang 1 Titik Instalasi Penerangan
A. MATERIAL
Kabel NYM 3x2½ mm 7.500 M' Rp. 4,500.00 = Rp. 33,750.00
Pipa PVC dia 19 mm 7.500 M' Rp. 11,200.00 = Rp. 84,000.00
Tee Doss 1.000 Bh Rp. 8,800.00 = Rp. 8,800.00
Jumlah ( 1 ) Rp. 126,550.00
B. TENAGA
Pekerja 0.600 Oh Rp. 80,000.00 = Rp. 48,000.00
Tukang Listrik 0.045 Oh Rp. 100,000.00 = Rp. 4,500.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.015 Oh Rp. 120,000.00 = Rp. 1,800.00
Jumlah ( 2 ) Rp. 55,950.00
Jumlah ( 1 ) + ( 2 ) Rp. 182,500.00
Memasang 1 Titik Saklar Tunggal
A. MATERIAL
Saklar Tunggal 1.000 M' Rp. 18,750.00 = Rp. 18,750.00
Jumlah ( 1 ) Rp. 18,750.00
B. TENAGA
Tukang Listrik 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 18,210.00
Jumlah ( 1 ) + ( 2 ) Rp. 36,960.00
Memasang 1 Titik Saklar Ganda
A. MATERIAL
Saklar Ganda 1.000 M' Rp. 22,500.00 = Rp. 22,500.00
Jumlah ( 1 ) Rp. 22,500.00
B. TENAGA
Tukang Listrik 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 18,210.00
Jumlah ( 1 ) + ( 2 ) Rp. 40,710.00
Memasang 1 Titik Stop Kontak
A. MATERIAL
Stop Kontak 1.000 M' Rp. 17,500.00 = Rp. 17,500.00
Jumlah ( 1 ) Rp. 17,500.00
B. TENAGA
Tukang Listrik 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 18,210.00
Jumlah ( 1 ) + ( 2 ) Rp. 35,710.00
Memasang 1 Titik Lampu TL 2 x 40 Watt
A. MATERIAL
Lampu TL 40 Watt 1.000 Bh Rp. 130,000.00 = Rp. 130,000.00
Jumlah ( 1 ) Rp. 130,000.00
B. TENAGA
Tukang Listrik 0.250 Oh Rp. 100,000.00 = Rp. 25,000.00
Kepala Tukang 0.025 Oh Rp. 110,000.00 = Rp. 2,750.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 29,310.00
Jumlah ( 1 ) + ( 2 ) Rp. 159,310.00

Memasang 1 Titik Lampu SL 18 Watt


A. MATERIAL
Fitting 1.000 Bh Rp. 12,000.00 = Rp. 12,000.00
Lampu SL 18 Watt 1.000 Bh Rp. 38,250.00 = Rp. 38,250.00
Jumlah ( 1 ) Rp. 50,250.00
B. TENAGA
Tukang Listrik 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 18,210.00
Jumlah ( 1 ) + ( 2 ) Rp. 68,460.00
Memasang 1 Titik Lampu SL 11 Watt
A. MATERIAL
Fitting 1.000 Bh Rp. 12,000.00 = Rp. 12,000.00
Lampu SL 11 Watt 1.000 Bh Rp. 30,000.00 = Rp. 30,000.00
Jumlah ( 1 ) Rp. 42,000.00
B. TENAGA
Tukang Listrik 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 18,210.00
Jumlah ( 1 ) + ( 2 ) Rp. 60,210.00
Memasang 1 Titik Box Sekring
A. MATERIAL
Box Sekring 1.000 Bh Rp. 62,000.00 = Rp. 62,000.00
Jumlah ( 1 ) Rp. 62,000.00
B. TENAGA
Tukang Listrik 0.150 Oh Rp. 100,000.00 = Rp. 15,000.00
Kepala Tukang 0.015 Oh Rp. 110,000.00 = Rp. 1,650.00
Mandor 0.013 Oh Rp. 120,000.00 = Rp. 1,560.00
Jumlah ( 2 ) Rp. 18,210.00
Jumlah ( 1 ) + ( 2 ) Rp. 80,210.00

XII. PEKERJAAN INSTALASI AIR


Memasang 1 buah kloset jongkok
A. MATERIAL
Kloset jongkok 1.000 Bh Rp. 183,000.00 = Rp. 183,000.00
Jumlah ( 1 ) Rp. 183,000.00
B. TENAGA
Pekerja 1.000 Oh Rp. 80,000.00 = Rp. 80,000.00
Tukang Batu 1.500 Oh Rp. 95,000.00 = Rp. 142,500.00
Kepala tukang 1.500 Oh Rp. 110,000.00 = Rp. 165,000.00
Mandor 0.160 Oh Rp. 120,000.00 = Rp. 19,200.00
Jumlah ( 2 ) Rp. 406,700.00
Jumlah ( 1 ) + ( 2 ) Rp. 589,700.00
Memasang 1 bh Floor drain
A. MATERIAL
Floor drain 1.000 Bh Rp. 16,000.00 = Rp. 16,000.00
Jumlah ( 1 ) Rp. 16,000.00
B. TENAGA
Pekerja 0.010 Oh Rp. 80,000.00 = Rp. 800.00
Tukang batu 0.100 Oh Rp. 95,000.00 = Rp. 9,500.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.0050 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 12,000.00
Jumlah ( 1 ) + ( 2 ) Rp. 28,000.00
Memasang 1 bh Kran Air 3/4"
A. MATERIAL
Kran Air 3/4" 1.000 Bh Rp. 16,500.00 = Rp. 16,500.00
Jumlah ( 1 ) Rp. 16,500.00
B. TENAGA
Pekerja 0.010 Oh Rp. 80,000.00 = Rp. 800.00
Tukang Pipa 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.0050 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 12,500.00
Jumlah ( 1 ) + ( 2 ) Rp. 29,000.00

1 m' Memasang pipa GIV diameter 3/4 "


A. MATERIAL
Pipa GIV 3/4" 1.200 m1 Rp. 198,000.00 = Rp. 237,600.00
Perlengkapan 0.350 Ls Rp. 69,300.00 = Rp. 24,255.00
Jumlah ( 1 ) Rp. 261,855.00
B. TENAGA
Pekerja 0.054 Oh Rp. 80,000.00 = Rp. 4,320.00
Tukang pipa 0.090 Oh Rp. 100,000.00 = Rp. 9,000.00
Kepala tukang 0.0090 Oh Rp. 110,000.00 = Rp. 990.00
Mandor 0.0027 Oh Rp. 120,000.00 = Rp. 324.00
Jumlah ( 2 ) Rp. 14,634.00
Jumlah ( 1 ) + ( 2 ) Rp. 276,489.00

1 m' Memasang pipa PVC tipe AW diameter 4 "


A. MATERIAL
Pipa PVC 1.200 m1 Rp. 240,000.00 = Rp. 288,000.00
Perlengkapan 0.350 Ls Rp. 240,000.00 = Rp. 84,000.00
Jumlah ( 1 ) Rp. 372,000.00
B. TENAGA
Pekerja 0.081 Oh Rp. 80,000.00 = Rp. 6,480.00
Tukang pipa 0.135 Oh Rp. 100,000.00 = Rp. 13,500.00
Kepala tukang 0.0135 Oh Rp. 110,000.00 = Rp. 1,485.00
Mandor 0.0041 Oh Rp. 120,000.00 = Rp. 492.00
Jumlah ( 2 ) Rp. 21,957.00
Jumlah ( 1 ) + ( 2 ) Rp. 393,957.00
1 m' Memasang pipa PVC tipe AW diameter 2.5 "
A. MATERIAL
Pipa PVC 1.200 m1 Rp. 140,000.00 = Rp. 168,000.00
Perlengkapan 0.350 Ls Rp. 140,000.00 = Rp. 49,000.00
Jumlah ( 1 ) Rp. 217,000.00
B. TENAGA
Pekerja 0.036 Oh Rp. 80,000.00 = Rp. 2,880.00
Tukang pipa 0.060 Oh Rp. 100,000.00 = Rp. 6,000.00
Kepala tukang 0.006 Oh Rp. 110,000.00 = Rp. 660.00
Mandor 0.0018 Oh Rp. 120,000.00 = Rp. 216.00
Jumlah ( 2 ) Rp. 9,756.00
Jumlah ( 1 ) + ( 2 ) Rp. 226,756.00

1 m' Memasang pipa PVC tipe AW diameter 3/4 "


A. MATERIAL
Pipa PVC 1.200 m1 Rp. 37,500.00 = Rp. 45,000.00
Perlengkapan 0.350 Ls Rp. 37,500.00 = Rp. 13,125.00
Jumlah ( 1 ) Rp. 58,125.00
B. TENAGA
Pekerja 0.036 Oh Rp. 80,000.00 = Rp. 2,880.00
Tukang pipa 0.060 Oh Rp. 100,000.00 = Rp. 6,000.00
Kepala tukang 0.006 Oh Rp. 110,000.00 = Rp. 660.00
Mandor 0.0018 Oh Rp. 120,000.00 = Rp. 216.00
Jumlah ( 2 ) Rp. 9,756.00
Jumlah ( 1 ) + ( 2 ) Rp. 67,881.00
1 m' Memasang pipa PVC tipe AW diameter 1/2 "
A. MATERIAL
Pipa PVC 1.200 m1 Rp. 30,000.00 = Rp. 36,000.00
Perlengkapan 0.350 Ls Rp. 30,000.00 = Rp. 10,500.00
Jumlah ( 1 ) Rp. 46,500.00
B. TENAGA
Pekerja 0.036 Oh Rp. 80,000.00 = Rp. 2,880.00
Tukang pipa 0.060 Oh Rp. 100,000.00 = Rp. 6,000.00
Kepala tukang 0.006 Oh Rp. 110,000.00 = Rp. 660.00
Mandor 0.0018 Oh Rp. 120,000.00 = Rp. 216.00
Jumlah ( 2 ) Rp. 9,756.00
Jumlah ( 1 ) + ( 2 ) Rp. 56,256.00
Memasang 1 buah Tarikan Jendela
A. MATERIAL
Tarikan Jendela 1.000 Bh Rp. 15,000.00 = Rp. 15,000.00
Jumlah ( 1 ) Rp. 15,000.00
B. TENAGA
Pekerja 0.010 Oh Rp. 80,000.00 = Rp. 800.00
Tukang kayu 0.100 Oh Rp. 100,000.00 = Rp. 10,000.00
Kepala tukang 0.010 Oh Rp. 110,000.00 = Rp. 1,100.00
Mandor 0.001 Oh Rp. 120,000.00 = Rp. 60.00
Jumlah ( 2 ) Rp. 11,960.00
Jumlah ( 1 ) + ( 2 ) Rp. 26,960.00
1 BH Pekerjaan Pemasangan Septicktank (kapasitas 2,5 m3)
Galian Tanah 9.82 m3 Rp. 36,800.00 = Rp. 361,376.00
pas. Batu tela 1 : 4 4.75 m2 Rp. 260,960.00 = Rp. 1,239,560.00
plesteran 1 : 2 17.64 m2 Rp. 76,682.40 = Rp. 1,352,677.54
besi beton 36.78 kg Rp. 16,115.33 = Rp. 592,721.93
pipa PVC dia. 4" 3.40 m Rp. 393,957.00 = Rp. 1,339,453.80
papan bekisting 1.50 m2 Rp. 134,460.00 = Rp. 201,690.00
cor beton plat penutup 1 : 2 : 3 0.20 m3 Rp. 3,963,251.90 = Rp. 792,650.38
pasir urug 1.00 m3 Rp. 409,200.00 = Rp. 409,200.00
batu kali 0.20 m3 Rp. 420,000.00 = Rp. 84,000.00
kerikil 0.20 m3 Rp. 750,000.00 = Rp. 150,000.00
ijuk 0.20 m3 Rp. 55,000.00 = Rp. 11,000.00
Jumlah Rp. 6,534,329.64
1 m2 Membuat Bekisting
A. MATERIAL
Papan bekesting 0.045 m3 Rp. 1,650,000.00 = Rp. 74,250.00
Paku 0.300 Kg Rp. 22,500.00 = Rp. 6,750.00
Jumlah ( 1 ) Rp. 81,000.00
B. TENAGA
Pekerja 0.300 Oh Rp. 80,000.00 = Rp. 24,000.00
Tukang Kayu 0.260 Oh Rp. 100,000.00 = Rp. 26,000.00
Kepala tukang kayu 0.026 Oh Rp. 110,000.00 = Rp. 2,860.00
Mandor 0.005 Oh Rp. 120,000.00 = Rp. 600.00
Jumlah ( 2 ) Rp. 53,460.00
Jumlah ( 1 ) + ( 2 ) Rp. 134,460.00
1 m' Membuat Saluran Air Hujan Terbuka
Galian Tanah 0.350 m3 Rp. 36,800.00 = Rp. 12,880.00
3
Urugan Pasir 0.004 m Rp. 409,200.00 = Rp. 1,636.80
Pasangan Batu Tela 1 : 4 0.128 m3 Rp. 260,960.00 = Rp. 33,402.88
Plesteran 1 : 2 + Acian 2.700 m2 Rp. 76,682.40 = Rp. 207,042.48
Jumlah = Rp. 254,962.16
DAFTAR HARGA BAHAN DAN UPAH KERJA
WAISAI DISTRIK KAB. RAJA AMPAT
TAHUN ANGGARAN 2013

I. UPAH KERJA

HARGA
NO JENIS TENAGA KERJA SATUAN
(Rp)
1 Mandor Lapangan O/H Rp 120,000.00
2 Kepala Tukang O/H Rp 110,000.00
3 Tukang Batu O/H Rp 95,000.00
4 Tukang Kayu O/H Rp 100,000.00
5 Tukang Cat O/H Rp 85,000.00
6 Tukang Besi O/H Rp 95,000.00
7 Tukang Listrik O/H Rp 100,000.00
8 Tukang pipa O/H Rp 100,000.00
9 Pekerja O/H Rp 80,000.00

II. HARGA SATUAN BAHAN

HARGA
NO JENIS BAHAN SATUAN
(Rp)
1 Batu Pecah split 2-3 M³ Rp 750,000.00
2 Batu Gunung / Batu Kali M³ Rp 420,000.00
3 Tanah Timbunan M³ Rp 108,000.00
4 Pasir Pasang,Pasir Plester M³ Rp 420,000.00
5 Pasir urug M³ Rp 320,000.00
6 Pasir Beton M³ Rp 420,000.00
7 Semen PC @ 50 Kg Zak Rp 130,000.00
8 Semen PC @ 50 Kg Kg Rp 2,600.00
9 Semen Warna Kg Rp 20,000.00
10 Batu Bata Merah Bh Rp 2,500.00
11 Cat Kayu (cat dasar) Kg Rp 39,500.00
12 Cat Kayu (cat kilap) Kg Rp 52,500.00
13 Cat Tembok Kg Rp 10,660.00
14 Cat Seng Kg Rp 50,000.00
15 Minyak Cat Ltr Rp 32,500.00
15 Plamur Kayu Kg Rp 60,000.00
16 Plamur Tembok Kg Rp 70,000.00
17 Besi Beton Kg Rp 16,115.33
18 Kawat Beton Kg Rp 35,000.00
19 Paku Biasa Kg Rp 22,500.00
20 Paku Tripleks Kg Rp 27,500.00
21 Paku genteng metal Kg Rp 40,000.00
22 Paku Seng Kg Rp 26,600.00
23 Kunci Pintu 2 slaag Bh Rp 125,000.00
24 Engsel Pintu Bh Rp 36,000.00
25 Engsel Jendela Bh Rp 22,500.00
26 Grendel Pintu / Jendela Bh Rp 21,000.00
27 Hak Angin Bh Rp 12,000.00
28 Tarikan Jendela Bh Rp 15,000.00
29 Atap genteng metal Lbr Rp 45,000.00
30 Nok Metal Roof Lbr Rp 35,000.00
31 Atap seng gelombang BJLS 30 Lbr Rp 75,000.00
32 Seng Plat BJLS 20 m' Rp 22,500.00
33 Cat Meni (Kayu besi ) Ltr Rp 39,500.00
34 Kuas Kecil 2" Bh Rp 11,500.00
35 Kuas Besar 3" Bh Rp 17,000.00
36 Kuas Rol Bh Rp 25,000.00
37 Amplas Halus lbr Rp 10,000.00
38 Tripleks Uk. 4 mm lbr Rp 85,000.00
39 Teakwood Uk. 4mm lbr Rp 161,000.00
40 Kaca riben 7-10 mm m2 Rp 285,000.00
41 Kran air 3/4" Bh Rp 16,500.00
42 Floor Drain Bh Rp 16,000.00
43 Kloset Jongkok Bh Rp 183,000.00
44 Pipa GIV 3/4" M' Rp 198,000.00
45 Pipa PVC 1/2" M' Rp 30,000.00
46 Pipa PVC 2 1/2" M' Rp 140,000.00
47 Pipa PVC 3/4" M' Rp 37,500.00
48 Pipa PVC 3" M' Rp 150,000.00
HARGA
NO JENIS BAHAN SATUAN
(Rp)

49 Pipa PVC 4" M' Rp 240,000.00


50 Minyak Bekisting Ltr Rp 5,600.00
51 Playwood 10 mm Lbr Rp 101,000.00
52 Dolken Kayu Ø 8mm Btg Rp 9,600.00
53 Keramik Lantai 40x40 m2 Rp 75,000.00
54 Keramik Lantai 20x20 m2 Rp 65,000.00
55 Keramik Dinding 20x25 m2 Rp 65,000.00
56 List Profil Plafond 4 cm m' Rp 17,500.00
57 Saklar Tunggal Bh Rp 18,750.00
58 Saklar Ganda Bh Rp 22,500.00
59 Stop Kontak Bh Rp 17,500.00
60 Kabel NYM 3x2.5 m' Rp 4,500.00
61 Tee Doz Bh Rp 8,800.00
62 Pipa Conduit Ø 19 mm M' Rp 11,200.00
63 Lampu TL 40 Watt Bh Rp 65,000.00
64 Lampu SL 18 Watt Bh Rp 38,250.00
65 Lampu SL 11 Watt Bh Rp 30,000.00
66 Fitting Lampu Bh Rp 12,000.00
67 Sekring Box Bh Rp 62,000.00
68 Washtafel Bh Rp 750,000.00
69 Kayu Klas II m3 Rp 1,650,000.00
70 Papan Kayu Klas II m3 Rp 1,650,000.00
71 Kayu Klas I m3 Rp 2,750,000.00
72 Papan Kayu Klas I m3 Rp 2,750,000.00
73 Kayu Klas III m3 Rp 1,650,000.00
74 Papan Kayu Klas III m3 Rp 1,650,000.00
DAFTAR HARGA BAHAN DAN UPAH
BASIC PRICE KABUPATEN RAJA AMPAT
PERIODE JANUARI/MARET
TAHUN 2012
Halaman : 1
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. DAFTAR HARGA BAHAN


1. BAHAN BATU
a. Batu Gunung m3 420,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 483,000
b. Batu Tela bh 6,000 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,900
c. Batu Bata Merah bh 2,500 2,750 2,750 2,750 2,750 2,750 2,750 2,750 2,750 2,750 2,750 2,875
d. Batu Pecah Mesin (Stone Chruser)
- Abu Batu m3 850,000 935,000 935,000 935,000 935,000 935,000 935,000 935,000 935,000 935,000 935,000 977,500
- Bt 1 - 2 cm' m3 750,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 862,500
- Bt 2 - 3 cm' m3 750,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 862,500
- Bt 3 - 5 cm' m3 750,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 862,500
- Bt 5 - 7 cm' m3 750,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 862,500

2. BAHAN KERIKIL
a. Kerikil Sungai (Bulat) m3 420,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 483,000
b. Kerikil Pecah Lokal m3 670,000 737,000 737,000 737,000 737,000 737,000 737,000 737,000 737,000 737,000 737,000 770,500

3. BAHAN PASIR
a. Pasir Pasang m3 420,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 483,000
b. Pasir Urug m3 320,000 352,000 352,000 352,000 352,000 352,000 352,000 352,000 352,000 352,000 352,000 368,000
c. Pasir Plester m3 420,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 483,000
d. Sirtu m3 200,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 230,000
e. Pasir Cor/Beton (Lokal) m3 420,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 483,000
f. Pasir Cor/Beton (Non Lokal) m3 750,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 862,500 Dari Palu
g. Pasir Cor/Beton (Non Lokal) m3 650,000 715,000 715,000 715,000 715,000 715,000 715,000 715,000 715,000 715,000 715,000 747,500 Dari Kema
4. BAHAN TANAH TIMBUNAN
a. Tanah Timbunan/Urugan Pilihan m3 108,000 118,800 118,800 118,800 118,800 118,800 118,800 118,800 118,800 118,800 118,800 124,200

5. BAHAN KARANG
a. Karang Kasar m3 420,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 462,000 483,000

6. BAHAN SEMEN
a. Semen Portland 50 Kg zak 130,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 143,000 149,500
b. Semen Portland 40 Kg zak 108,000 118,800 118,800 118,800 118,800 118,800 118,800 118,800 118,800 118,800 118,800 124,200
c. Semen Putih kg 7,000 7,700 7,700 7,700 7,700 7,700 7,700 7,700 7,700 7,700 7,700 8,050
d. Semen Warna kg 20,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 23,000
Halaman : 2
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

7. BAHAN LANTAI
A. Keramik Polos
a. Keramik 20 x 20 m2 65,000 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 74,750
b. Keramik 20 x 25 m2 65,000 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 74,750
c. Keramik 30 x 30 m2 70,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 80,500
d. Keramik 40 x 40 m2 75,000 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 86,250

B. Keramik Motif
a. Keramik 20 x 20 m2 85,000 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 97,750
b. Keramik 30 x 30 m2 87,500 96,250 96,250 96,250 96,250 96,250 96,250 96,250 96,250 96,250 96,250 100,625
c. Keramik 40 x 40 m2 100,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 115,000
d. Ubin Mozaik/Km 20 x 20 m2 75,000 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 86,250
e. Granit Tile m2 281,000 309,100 309,100 309,100 309,100 309,100 309,100 309,100 309,100 309,100 309,100 323,150
f. Karpet Plastik 120 cm m1 24,000 26,400 26,400 26,400 26,400 26,400 26,400 26,400 26,400 26,400 26,400 27,600
g. Karpet Plastik 180 cm m1 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
h. Karpet Plastik 200 cm m1 41,000 45,100 45,100 45,100 45,100 45,100 45,100 45,100 45,100 45,100 45,100 47,150
i. Karpet Bludru m1 50,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 57,500
j. Terpal Ukuran 3 x 4 m Lbr 85,000 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 97,750
k. Terpal Ukuran 4 x 6 m Lbr 170,000 187,000 187,000 187,000 187,000 187,000 187,000 187,000 187,000 187,000 187,000 195,500
l. Terpal Ukuran 6 x 8 m Lbr 340,000 374,000 374,000 374,000 374,000 374,000 374,000 374,000 374,000 374,000 374,000 391,000
m. Terpal Ukuran 8 x 10 m Lbr 565,000 621,500 621,500 621,500 621,500 621,500 621,500 621,500 621,500 621,500 621,500 649,750

8. BAHAN KAYU
a. Kayu Besi
- Balok ukuran 6 x 12 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Balok ukuran 10 x 10 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Balok ukuran 5 x 10 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Balok ukuran 5x5 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Papan ukuran 3 x 20 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Papan ukuran 2.5 x 25 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Papan ukuran 2.5 x 30 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Papan ukuran 3 x 30 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
- Papan ukuran 4 x 25 m3 2,750,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,025,000 3,162,500
b. Kayu Matoa/Lombo m3
- Balok ukuran 10 x 10 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
- Balok ukuran 5 x 10 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
- Balok ukuran 5 x 5 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
- Papan ukuran 2.5 x 25 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
- Papan ukuran 3 x 20 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
c. Kayu untuk Begesting
- Balok ukuran 5 x 10 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
- Balok ukuran 5 x 5 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
- Papan ukuran 2.5 x 30 m3 1,650,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,815,000 1,897,500
Halaman : 3
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

d. Kayu mangi-mangi btg 50,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 57,500
e. Kayu gatal m1 60,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 69,000
f. Tripleks
- Tripleks ukuran 3 mm lbr 67,000 73,700 73,700 73,700 73,700 73,700 73,700 73,700 73,700 73,700 73,700 77,050
- Tripleks ukuran 4 mm lbr 85,000 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 93,500 97,750
- Tripleks ukuran 5 mm lbr - - - - - - - - - - -
g. Multipleks
- Multipleks ukuran 10 mm lbr 101,000 111,100 111,100 111,100 111,100 111,100 111,100 111,100 111,100 111,100 111,100 116,150
- Multipleks ukuran 12 mm lbr 151,000 166,100 166,100 166,100 166,100 166,100 166,100 166,100 166,100 166,100 166,100 173,650
- Multipleks ukuran 20 mm lbr 191,000 210,100 210,100 210,100 210,100 210,100 210,100 210,100 210,100 210,100 210,100 219,650
h. Teak Wood
- Teak Wood ukuran 3 mm lbr 100,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 115,000
- Teak Wood ukuran 4 mm lbr 161,000 177,100 177,100 177,100 177,100 177,100 177,100 177,100 177,100 177,100 177,100 185,150
i. Formika
- Formika Polos lbr 91,000 100,100 100,100 100,100 100,100 100,100 100,100 100,100 100,100 100,100 100,100 104,650
- Formika Kembang lbr 116,000 127,600 127,600 127,600 127,600 127,600 127,600 127,600 127,600 127,600 127,600 133,400
j. Lambersering btg 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
k. List Profil btg 17,500 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 20,125
l. Gypsum Board btg 125,000 137,500 137,500 137,500 137,500 137,500 137,500 137,500 137,500 137,500 137,500 143,750

9. BAHAN ATAP
a. Seng Gelombang
- Seng Gelombang 6 kk BJLS 20 lbr 51,500 56,650 56,650 56,650 56,650 56,650 56,650 56,650 56,650 56,650 56,650 59,225
- Seng Gelombang 7 kk BJLS 20 lbr 65,000 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 74,750
- Seng Gelombang 6 kk BJLS 30 lbr 75,000 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 86,250
- Seng Gelombang 7 kk BJLS 30 lbr 87,000 95,700 95,700 95,700 95,700 95,700 95,700 95,700 95,700 95,700 95,700 100,050
b. Seng Plat
- Seng Plat BJLS 20 m1 22,500 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 25,875
- Seng Plat BJLS 30 m1 30,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 34,500
- Seng Talang m1 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
c. Seng Plastik
- Seng Plastik Gelombang Besar 6 kk lbr 48,500 53,350 53,350 53,350 53,350 53,350 53,350 53,350 53,350 53,350 53,350 55,775
- Seng Plastik Gelombang Besar 7 kk lbr 61,000 67,100 67,100 67,100 67,100 67,100 67,100 67,100 67,100 67,100 67,100 70,150
- Seng Plastik Gelombang Kecil lbr 33,000 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 37,950
d. Metal Roof lbr 45,000 49,500 49,500 49,500 49,500 49,500 49,500 49,500 49,500 49,500 49,500 51,750
Noc Metal Roof lbr 35,000 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 40,250
10. BAHAN KACA
a. Kaca Bening 5 mm' lbr 250,000 275,000 275,000 275,000 275,000 275,000 275,000 275,000 275,000 275,000 275,000 287,500
b. Kaca Rayben 5 mm' lbr 285,000 313,500 313,500 313,500 313,500 313,500 313,500 313,500 313,500 313,500 313,500 327,750
c. Kaca Cermin tebal lbr 78,000 85,800 85,800 85,800 85,800 85,800 85,800 85,800 85,800 85,800 85,800 89,700
Halaman : 4
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

11. BAHAN JENDELA LOVER


a. Lover/nako 6 klip set 80,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 92,000
b. Lover/nako 8 klip set 110,000 121,000 121,000 121,000 121,000 121,000 121,000 121,000 121,000 121,000 121,000 126,500
c. Rangka Lover/nako tanpa Trali lbr 165,000 181,500 181,500 181,500 181,500 181,500 181,500 181,500 181,500 181,500 181,500 189,750

12. BAHAN PENGUNCI/PENGGANTUNG


a. Kunci Tanam bh. 125,000 137,500 137,500 137,500 137,500 137,500 137,500 137,500 137,500 137,500 137,500 143,750
b. Gembok besar bh. 45,000 49,500 49,500 49,500 49,500 49,500 49,500 49,500 49,500 49,500 49,500 51,750
c. Gembok kecil bh. 14,000 15,400 15,400 15,400 15,400 15,400 15,400 15,400 15,400 15,400 15,400 16,100
d. Kunci Laci bh. 17,500 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 20,125
e. Engsel
- Engsel Jendela pas. 22,500 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 25,875
- Engsel Pintu pas. 36,000 39,600 39,600 39,600 39,600 39,600 39,600 39,600 39,600 39,600 39,600 41,400
- Engsel Kupu-kupu ring nilon Pintu pas. 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
- Engsel Kupu-kupu ring nilon Jendela pas. 14,000 15,400 15,400 15,400 15,400 15,400 15,400 15,400 15,400 15,400 15,400 16,100
- Hak Angin Biasa pas. 12,000 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,800
- Hak Angin Lipat pas. 20,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 22,000 23,000
- Kunci Gembok bh. 26,000 28,600 28,600 28,600 28,600 28,600 28,600 28,600 28,600 28,600 28,600 29,900
- Grendel Lecil bh. 16,000 17,600 17,600 17,600 17,600 17,600 17,600 17,600 17,600 17,600 17,600 18,400
- Grendel Sedang bh. 21,000 23,100 23,100 23,100 23,100 23,100 23,100 23,100 23,100 23,100 23,100 24,150
- Grendel Besar bh. 28,500 31,350 31,350 31,350 31,350 31,350 31,350 31,350 31,350 31,350 31,350 32,775
- Tarikan jendela bh. 15,000 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 17,250
- Grendel rante bh. 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750

13. BAHAN SANITAIR


a. Kloset duduk porselin (biasa) bh. 600,000 660,000 660,000 660,000 660,000 660,000 660,000 660,000 660,000 660,000 660,000 690,000
Kloset duduk porselin bh. 800,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 920,000
b. Kloset jongkok Keramik bh. 183,000 201,300 201,300 201,300 201,300 201,300 201,300 201,300 201,300 201,300 201,300 210,450
c. Wastafel Keramik bh. 750,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 825,000 862,500
d. Was bak/bak cuci logam 1 lobang bh. 400,000 440,000 440,000 440,000 440,000 440,000 440,000 440,000 440,000 440,000 440,000 460,000
e. Bak Mandi Feber Kotak bh. 520,000 572,000 572,000 572,000 572,000 572,000 572,000 572,000 572,000 572,000 572,000 598,000
f. Kran air plastik bh. 16,500 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,975
g. kran air kuningan bh. 50,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 57,500
h. Hans shower bh. 70,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 80,500
i. Tandon Air
- Tandon Plastik Profil Tank 400 Liter bh. 680,000 748,000 748,000 748,000 748,000 748,000 748,000 748,000 748,000 748,000 748,000 782,000
- Tandon Plastik Profil Tank 450 Liter bh. 800,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000 920,000
- Tandon Plastik Profil Tank 520 Liter bh. 1,300,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,495,000
- Tandon Plastik Profil Tank 1100 Liter bh. 1,800,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 2,070,000
- Tandon Plastik Profil Tank 1200 Liter bh. 2,000,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,300,000
- Tandon Plastik Profil Tank 2200 Liter bh. 4,000,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,600,000
- Tandon Plastik Profil Tank 3300 Liter bh. 5,500,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,325,000
- Tandon Plastik Profil Tank 5200 Liter bh. 10,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,500,000
Halaman : 5
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

j.Bak Air Feber glass


- Bak Air Feber glass bh. 2,739,000 3,012,900 3,012,900 3,012,900 3,012,900 3,012,900 3,012,900 3,012,900 3,012,900 3,012,900 3,012,900 3,149,850
k. Pompa Dragon bh. 550,000 605,000 605,000 605,000 605,000 605,000 605,000 605,000 605,000 605,000 605,000 632,500
l. Mesin Pompa Air
- 100 Watt bh. 826,000 908,600 908,600 908,600 908,600 908,600 908,600 908,600 908,600 908,600 908,600 949,900
- 150 Watt bh. 2,026,000 2,228,600 2,228,600 2,228,600 2,228,600 2,228,600 2,228,600 2,228,600 2,228,600 2,228,600 2,228,600 2,329,900

14. BAHAN PAKU/BAUT


a. Paku
- Paku Tripleks kg. 27,500 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 31,625
- Paku Persegi kg. 30,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 34,500
- Paku 1/4 - 1/2 kg. 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
- Paku 1 - 3 kg. 21,500 23,650 23,650 23,650 23,650 23,650 23,650 23,650 23,650 23,650 23,650 24,725
- Paku 2 1/2 - 7 kg. 22,500 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,725
- Paku Seng Gelombang kg. 26,600 29,260 29,260 29,260 29,260 29,260 29,260 29,260 29,260 29,260 29,260 30,590
- Paku genteng metal kg. 40,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 46,000
- Paku Tembok/beton dos 34,000 37,400 37,400 37,400 37,400 37,400 37,400 37,400 37,400 37,400 37,400 39,100
- Paku Tembok/beton dos 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
- Timah Solder roll 42,500 46,750 46,750 46,750 46,750 46,750 46,750 46,750 46,750 46,750 46,750 48,875
b. Baut
- Baut + Mur f 3/8'' - 17,5 bh. 7,700 8,470 8,470 8,470 8,470 8,470 8,470 8,470 8,470 8,470 8,470 8,855
- Baut + Mur f 3/8'' - 15 bh. 9,350 10,285 10,285 10,285 10,285 10,285 10,285 10,285 10,285 10,285 10,285 10,753
- Baut + Mur f 3/8'' - 20 bh. 9,900 108,900 108,900 108,900 108,900 108,900 108,900 108,900 108,900 108,900 108,900 158,400
- Baut + Mur f 3/8'' - 30 bh. 16,500 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,975
- Baut bh. 11,000 12,100 12,100 12,100 12,100 12,100 12,100 12,100 12,100 12,100 12,100 12,650
- But Mur bh. 16,500 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,150 18,975
- Ring bh. 1,000 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,100 1,150

15. BAHAN KAWAT BAJA


a. Kawat Ikat kg. 35,000 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 40,250
b. Kawat Duri
- Kawat Duri Kecil roll 200,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 220,000 230,000
- Kawat Duri Besar roll 300,000 330,000 330,000 330,000 330,000 330,000 330,000 330,000 330,000 330,000 330,000 345,000
c. Kawat Ram m1 27,500 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 31,625
d. Kawat Harmonika m1 27,500 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 30,250 31,625
e. Kawat Nyamuk Plastik m1 15,077 16,584 16,584 16,584 16,584 16,584 16,584 16,584 16,584 16,584 16,584 17,338
f. Kawat Nyamuk Besi m1 30,068 33,074 33,074 33,074 33,074 33,074 33,074 33,074 33,074 33,074 33,074 34,578
g. Kawat Ayakan m1 22,500 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 25,875

16. BAHAN BESI BETON/BAJA


a. Besi Beton Bulat
- Diamater 6 mm btg. 50,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 57,500
- Diamater 8 mm btg. 77,500 85,250 85,250 85,250 85,250 85,250 85,250 85,250 85,250 85,250 85,250 89,125
Halaman : 6
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

- Diamater 10 mm btg. 97,500 107,250 107,250 107,250 107,250 107,250 107,250 107,250 107,250 107,250 107,250 112,125
- Diamater 12 mm btg. 133,000 146,300 146,300 146,300 146,300 146,300 146,300 146,300 146,300 146,300 146,300 152,950
- Diamater 16 mm btg. 220,000 242,000 242,000 242,000 242,000 242,000 242,000 242,000 242,000 242,000 242,000 253,000
- Diamater 19 mm btg. 274,000 301,400 301,400 301,400 301,400 301,400 301,400 301,400 301,400 301,400 301,400 315,100

b. Besi Beton Ulir


- Diamater 13 mm btg. 148,000 162,800 162,800 162,800 162,800 162,800 162,800 162,800 162,800 162,800 162,800 170,200
- Diamater 16 mm btg. 243,000 267,300 267,300 267,300 267,300 267,300 267,300 267,300 267,300 267,300 267,300 279,450
- Diamater 19 mm btg. 314,000 345,400 345,400 345,400 345,400 345,400 345,400 345,400 345,400 345,400 345,400 361,100

17. BAHAN PIPA UNTUK PEKERJAAN


BANGUNAN
a. Pipa PVC
- Diameter 1/2" btg. 30,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 34,500
- Diameter 3/4" btg. 37,500 41,250 41,250 41,250 41,250 41,250 41,250 41,250 41,250 41,250 41,250 43,125
- Diameter 1" btg. 46,600 51,260 51,260 51,260 51,260 51,260 51,260 51,260 51,260 51,260 51,260 53,590
- Diameter 1 1/2" btg. 87,500 96,250 96,250 96,250 96,250 96,250 96,250 96,250 96,250 96,250 96,250 100,625
- Diameter 2" btg. 107,500 118,250 118,250 118,250 118,250 118,250 118,250 118,250 118,250 118,250 118,250 123,625
- Diameter 2 1/2" btg. 140,000 154,000 154,000 154,000 154,000 154,000 154,000 154,000 154,000 154,000 154,000 161,000
- Diameter 3" btg. 150,000 165,000 165,000 165,000 165,000 165,000 165,000 165,000 165,000 165,000 165,000 172,500
- Diameter 4" btg. 240,000 264,000 264,000 264,000 264,000 264,000 264,000 264,000 264,000 264,000 264,000 276,000
b. Pipa GIV
- Diameter 1/2" btg. 133,000 146,300 146,300 146,300 146,300 146,300 146,300 146,300 146,300 146,300 146,300 152,950
- Diameter 3/4" btg. 198,000 217,800 217,800 217,800 217,800 217,800 217,800 217,800 217,800 217,800 217,800 227,700
- Diameter 1" btg. 298,000 327,800 327,800 327,800 327,800 327,800 327,800 327,800 327,800 327,800 327,800 342,700
- Diameter 1 1/2" btg. 366,000 402,600 402,600 402,600 402,600 402,600 402,600 402,600 402,600 402,600 402,600 420,900
- Diameter 2" btg. 476,000 523,600 523,600 523,600 523,600 523,600 523,600 523,600 523,600 523,600 523,600 547,400
- Diameter 2 1/2" btg. 570,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000 627,000 655,500
- Diameter 3" btg. 770,000 847,000 847,000 847,000 847,000 847,000 847,000 847,000 847,000 847,000 847,000 885,500

18. BAHAN CAT


a. Cat Tembok
- Cat Tembok 5 kg klg. 53,300 58,630 58,630 58,630 58,630 58,630 58,630 58,630 58,630 58,630 58,630 61,295
- Cat Tembok 20 kg klg. 160,000 176,000 176,000 176,000 176,000 176,000 176,000 176,000 176,000 176,000 176,000 184,000
b. Cat Kayu
- Cat Dasar kg. 39,500 43,450 43,450 43,450 43,450 43,450 43,450 43,450 43,450 43,450 43,450 45,425
- Cat Kilap kg. 52,500 57,750 57,750 57,750 57,750 57,750 57,750 57,750 57,750 57,750 57,750 60,375
c. Cat Aluminium kg. 75,000 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 86,250
d. Cat genteng kg. 23,750 26,125 26,125 26,125 26,125 26,125 26,125 26,125 26,125 26,125 26,125 27,313
e. Cat Besi
- Cat Besi kg. 50,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 55,000 57,500
- Menie ltr. 35,000 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 38,500 40,250
f. Plamur Tembok kg. 70,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 77,000 80,500
Halaman : 7
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

g. Residu kg. 126,000 138,600 138,600 138,600 138,600 138,600 138,600 138,600 138,600 138,600 138,600 144,900
h. Teak oil ltr. 31,000 34,100 34,100 34,100 34,100 34,100 34,100 34,100 34,100 34,100 34,100 35,650
i. Plitur kg. 60,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 66,000 69,000
j. Dempul kg. 32,500 35,750 35,750 35,750 35,750 35,750 35,750 35,750 35,750 35,750 35,750 37,375
k. Minyak Cat/Thinner ltr. 32,500 35,750 35,750 35,750 35,750 35,750 35,750 35,750 35,750 35,750 35,750 37,375
l. Amplas Kayu m' 10,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,500
m. Lem Kayu kg. 22,500 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 25,875
n. Kuas rol bh. 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
o. Kuas Biasa
- Kuas 1" bh. 6,000 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,600 6,900
- Kuas 2" bh. 11,500 12,650 12,650 12,650 12,650 12,650 12,650 12,650 12,650 12,650 12,650 13,225
- Kuas 2,5" bh. 15,000 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 17,250
- Kuas 3" bh. 17,000 18,700 18,700 18,700 18,700 18,700 18,700 18,700 18,700 18,700 18,700 19,550
18. BAHAN INSTALASI LISTRIK
a. Lampu TL Lengkap
- Lampu TL Lengkap 20 watt bh. 55,000 60,500 60,500 60,500 60,500 60,500 60,500 60,500 60,500 60,500 60,500 63,250
- Lampu TL Lengkap 40 watt bh. 65,000 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 71,500 74,750
- Lampu TL Lengkap 60 watt bh. 75,000 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 82,500 86,250
b. Lampu SL
- Lampi SL 5 Watt bh. 25,000 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 27,500 28,750
- Lampi SL 8 Watt bh. 28,000 30,800 30,800 30,800 30,800 30,800 30,800 30,800 30,800 30,800 30,800 32,200
- Lampi SL 11 Watt bh. 30,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 33,000 34,500
- Lampi SL 14 Watt bh. 33,000 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 36,300 37,950
- Lampi SL 18 Watt bh. 38,250 42,075 42,075 42,075 42,075 42,075 42,075 42,075 42,075 42,075 42,075 43,988
- Lampi SL 23 Watt bh. 43,500 47,850 47,850 47,850 47,850 47,850 47,850 47,850 47,850 47,850 47,850 50,025
c. Lampu Pijar
- Lampu Pijar Merah bh. 5,000 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,750
- Lampu Pijar Kuning bh. 5,000 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,750
- Lampu Pijar Hijau bh. 5,000 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,500 5,750
d. Sekering Otomat Unit 72,000 79,200 79,200 79,200 79,200 79,200 79,200 79,200 79,200 79,200 79,200 82,800
e. Sekering Box bh. 62,000 68,200 68,200 68,200 68,200 68,200 68,200 68,200 68,200 68,200 68,200 71,300
f. Kabel NYM
- Kabel NYM 1 x 2,5 mm m1 7,000 7,700 7,700 7,700 7,700 7,700 7,700 7,700 7,700 7,700 7,700 8,050
- Kabel NYM 2 x 2,5 mm m1 11,400 12,540 12,540 12,540 12,540 12,540 12,540 12,540 12,540 12,540 12,540 13,110
- Kabel NYM 3 x 2,6 mm m1 15,000 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 16,500 17,250
g. Kabel NYA
- Kabel NYA 1 x 1,5 mm Merah m1 3,500 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 4,025
- Kabel NYM 1 x 1,5 mm Hitam m1 3,500 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 3,850 4,025
- Kabel NYM 1 x 2,5 mm Merah m1 4,500 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 5,175
- Kabel NYM 3 x 2,5 mm Hitam m1 4,500 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 4,950 5,175
h. Saklar Tunggal bh. 18,750 20,625 20,625 20,625 20,625 20,625 20,625 20,625 20,625 20,625 20,625 21,563
i. Saklar Ganda bh. 22,500 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 24,750 25,875
j. Stop Kontak bh. 17,500 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 19,250 20,125
Halaman : 8
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
WAISAI WAIGEO MEOS SALAWATI SALAWATI SALAWATI BATANTA BATANTA TELUK TIPLOL WAIGEO WAIGEO
KOTA SELATAN MANSAR UTARA TENGAH BARAT UTARA SELATAN MAYAILIBIT MAYAILIBIT TIMUR UTARA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

19. BAHAN ASPAL kg 16,000 17,600 17,600 17,600 17,600 17,600 17,600 17,600 17,600 17,600 17,600 18,400

20. BAHAN BAHAN BAKAR DAN OLIE


a. Minyak Tanah ltr 11,700 12,870 12,870 12,870 12,870 12,870 12,870 12,870 12,870 12,870 12,870 13,455
b. Bensin ltr 11,300 12,430 12,430 12,430 12,430 12,430 12,430 12,430 12,430 12,430 12,430 12,995
c. Solar ltr 12,000 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,200 13,800
d. Minyak Pelumas ltr 40,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 44,000 46,000

B. DAFTAR HARGA UPAH


1 Mandor Lapangan H/O 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 8 Jam Kerja/Hr
2 Mekanik H/O 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 8 Jam Kerja/Hr
3 Mekanik Pembantu H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
4 Tukang Kepala H/O 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 8 Jam Kerja/Hr
5 Tukang Kayu H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
6 Tukang Batu H/O 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 8 Jam Kerja/Hr
7 Tukang Besi H/O 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 8 Jam Kerja/Hr
8 Tukang Cat H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
9 Tukang Gali H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
10 Tukang Las H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
11 Tukang Listrik H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
12 Tukang Pipa H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
13 Operator Terlatih H/O 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 8 Jam Kerja/Hr
14 Pembantu Operator H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
15 Supir H/O 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 8 Jam Kerja/Hr
16 Pembantu Supir / Kenek H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
17 Pekerja H/O 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 8 Jam Kerja/Hr
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A. DAFTAR HARGA BAHAN


1. BAHAN BATU
a. Batu Gunung m3 483,000 483,000 483,000 483,000 483,000 504,000 504,000 504,000 504,000 504,000 504,000 504,000
b. Batu Tela bh 6,900 6,900 6,900 6,900 6,900 7,200 7,200 7,200 7,200 7,200 7,200 7,200
c. Batu Bata Merah bh 2,875 2,875 2,875 2,875 2,875 3,000 3,000 3,000 3,000 3,000 3,000 3,000
d. Batu Pecah Mesin (Stone Chruser)
- Abu Batu m3 977,500 977,500 977,500 977,500 977,500 1,020,000 1,020,000 1,020,000 1,020,000 1,020,000 1,020,000 1,020,000
- Bt 1 - 2 cm' m3 862,500 862,500 862,500 862,500 862,500 900,000 900,000 900,000 900,000 900,000 900,000 900,000
- Bt 2 - 3 cm' m3 862,500 862,500 862,500 862,500 862,500 900,000 900,000 900,000 900,000 900,000 900,000 900,000
- Bt 3 - 5 cm' m3 862,500 862,500 862,500 862,500 862,500 900,000 900,000 900,000 900,000 900,000 900,000 900,000
- Bt 5 - 7 cm' m3 862,500 862,500 862,500 862,500 862,500 900,000 900,000 900,000 900,000 900,000 900,000 900,000

2. BAHAN KERIKIL
a. Kerikil Sungai (Bulat) m3 483,000 483,000 483,000 483,000 483,000 504,000 504,000 504,000 504,000 504,000 504,000 504,000
b. Kerikil Pecah Lokal m3 770,500 770,500 770,500 770,500 770,500 804,000 804,000 804,000 804,000 804,000 804,000 804,000

3. BAHAN PASIR
a. Pasir Pasang m3 483,000 483,000 483,000 483,000 483,000 504,000 504,000 504,000 504,000 504,000 504,000 504,000
b. Pasir Urug m3 368,000 368,000 368,000 368,000 368,000 384,000 384,000 384,000 384,000 384,000 384,000 384,000
c. Pasir Plester m3 483,000 483,000 483,000 483,000 483,000 504,000 504,000 504,000 504,000 504,000 504,000 504,000
d. Sirtu m3 230,000 230,000 230,000 230,000 230,000 240,000 240,000 240,000 240,000 240,000 240,000 240,000
e. Pasir Cor/Beton (Lokal) m3 483,000 483,000 483,000 483,000 483,000 504,000 504,000 504,000 504,000 504,000 504,000 504,000
f. Pasir Cor/Beton (Non Lokal) m3 862,500 862,500 862,500 862,500 862,500 900,000 900,000 900,000 900,000 900,000 900,000 900,000 Dari Palu
g. Pasir Cor/Beton (Non Lokal) m3 747,500 747,500 747,500 747,500 747,500 780,000 780,000 780,000 780,000 780,000 780,000 780,000 Dari Kema
4. BAHAN TANAH TIMBUNAN
a. Tanah Timbunan/Urugan Pilihan m3 124,200 124,200 124,200 124,200 124,200 129,600 129,600 129,600 129,600 129,600 129,600 129,600

5. BAHAN KARANG
a. Karang Kasar m3 483,000 483,000 483,000 483,000 483,000 504,000 504,000 504,000 504,000 504,000 504,000 504,000

6. BAHAN SEMEN
a. Semen Portland 50 Kg zak 149,500 149,500 149,500 149,500 149,500 156,000 156,000 156,000 156,000 156,000 156,000 156,000
b. Semen Portland 40 Kg zak 124,200 124,200 124,200 124,200 124,200 129,600 129,600 129,600 129,600 129,600 129,600 129,600
c. Semen Putih kg 8,050 8,050 8,050 8,050 8,050 8,400 8,400 8,400 8,400 8,400 8,400 8,400
d. Semen Warna kg 23,000 23,000 23,000 23,000 23,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

7. BAHAN LANTAI
A. Keramik Polos
a. Keramik 20 x 20 m2 74,750 74,750 74,750 74,750 74,750 78,000 78,000 78,000 78,000 78,000 78,000 78,000
b. Keramik 20 x 25 m2 74,750 74,750 74,750 74,750 74,750 78,000 78,000 78,000 78,000 78,000 78,000 78,000
c. Keramik 30 x 30 m2 80,500 80,500 80,500 80,500 80,500 84,000 84,000 84,000 84,000 84,000 84,000 84,000
d. Keramik 40 x 40 m2 86,250 86,250 86,250 86,250 86,250 90,000 90,000 90,000 90,000 90,000 90,000 90,000

B. Keramik Motif
a. Keramik 20 x 20 m2 97,750 97,750 97,750 97,750 97,750 102,000 102,000 102,000 102,000 102,000 102,000 102,000
b. Keramik 30 x 30 m2 100,625 100,625 100,625 100,625 100,625 105,000 105,000 105,000 105,000 105,000 105,000 105,000
c. Keramik 40 x 40 m2 115,000 115,000 115,000 115,000 115,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000
d. Ubin Mozaik/Km 20 x 20 m2 86,250 86,250 86,250 86,250 86,250 90,000 90,000 90,000 90,000 90,000 90,000 90,000
e. Granit Tile m2 323,150 323,150 323,150 323,150 323,150 337,200 337,200 337,200 337,200 337,200 337,200 337,200
f. Karpet Plastik 120 cm m1 27,600 27,600 27,600 27,600 27,600 28,800 28,800 28,800 28,800 28,800 28,800 28,800
g. Karpet Plastik 180 cm m1 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
h. Karpet Plastik 200 cm m1 47,150 47,150 47,150 47,150 47,150 49,200 49,200 49,200 49,200 49,200 49,200 49,200
i. Karpet Bludru m1 57,500 57,500 57,500 57,500 57,500 60,000 60,000 60,000 60,000 60,000 60,000 60,000
j. Terpal Ukuran 3 x 4 m Lbr 97,750 97,750 97,750 97,750 97,750 102,000 102,000 102,000 102,000 102,000 102,000 102,000
k. Terpal Ukuran 4 x 6 m Lbr 195,500 195,500 195,500 195,500 195,500 204,000 204,000 204,000 204,000 204,000 204,000 204,000
l. Terpal Ukuran 6 x 8 m Lbr 391,000 391,000 391,000 391,000 391,000 408,000 408,000 408,000 408,000 408,000 408,000 408,000
m. Terpal Ukuran 8 x 10 m Lbr 649,750 649,750 649,750 649,750 649,750 678,000 678,000 678,000 678,000 678,000 678,000 678,000

8. BAHAN KAYU
a. Kayu Besi
- Balok ukuran 6 x 12 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Balok ukuran 10 x 10 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Balok ukuran 5 x 10 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Balok ukuran 5x5 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Papan ukuran 3 x 20 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Papan ukuran 2.5 x 25 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Papan ukuran 2.5 x 30 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Papan ukuran 3 x 30 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
- Papan ukuran 4 x 25 m3 3,162,500 3,162,500 3,162,500 3,162,500 3,162,500 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000 3,300,000
b. Kayu Matoa/Lombo m3
- Balok ukuran 10 x 10 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
- Balok ukuran 5 x 10 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
- Balok ukuran 5 x 5 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
- Papan ukuran 2.5 x 25 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
- Papan ukuran 3 x 20 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
c. Kayu untuk Begesting
- Balok ukuran 5 x 10 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
- Balok ukuran 5 x 5 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
- Papan ukuran 2.5 x 30 m3 1,897,500 1,897,500 1,897,500 1,897,500 1,897,500 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

d. Kayu mangi-mangi btg 57,500 57,500 57,500 57,500 57,500 60,000 60,000 60,000 60,000 60,000 60,000 60,000
e. Kayu gatal m1 69,000 69,000 69,000 69,000 69,000 72,000 72,000 72,000 72,000 72,000 72,000 72,000
f. Tripleks
- Tripleks ukuran 3 mm lbr 77,050 77,050 77,050 77,050 77,050 80,400 80,400 80,400 80,400 80,400 80,400 80,400
- Tripleks ukuran 4 mm lbr 97,750 97,750 97,750 97,750 97,750 102,000 102,000 102,000 102,000 102,000 102,000 102,000
- Tripleks ukuran 5 mm lbr - - - - - - - - - - - -
g. Multipleks
- Multipleks ukuran 10 mm lbr 116,150 116,150 116,150 116,150 116,150 121,200 121,200 121,200 121,200 121,200 121,200 121,200
- Multipleks ukuran 12 mm lbr 173,650 173,650 173,650 173,650 166,100 181,200 181,200 181,200 181,200 181,200 181,200 181,200
- Multipleks ukuran 20 mm lbr 219,650 219,650 219,650 219,650 219,650 229,200 229,200 229,200 229,200 229,200 229,200 229,200
h. Teak Wood
- Teak Wood ukuran 3 mm lbr 115,000 115,000 115,000 115,000 115,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000
- Teak Wood ukuran 4 mm lbr 185,150 185,150 185,150 185,150 185,150 193,200 193,200 193,200 193,200 193,200 193,200 193,200
i. Formika
- Formika Polos lbr 104,650 104,650 104,650 104,650 104,650 109,200 109,200 109,200 109,200 109,200 109,200 109,200
- Formika Kembang lbr 133,400 133,400 133,400 133,400 133,400 139,200 139,200 139,200 139,200 139,200 139,200 139,200
j. Lambersering btg 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
k. List Profil btg 20,125 20,125 20,125 20,125 20,125 21,000 21,000 21,000 21,000 21,000 21,000 21,000
l. Gypsum Board btg 143,750 143,750 143,750 143,750 143,750 150,000 150,000 150,000 150,000 150,000 150,000 150,000

9. BAHAN ATAP
a. Seng Gelombang
- Seng Gelombang 6 kk BJLS 20 lbr 59,225 59,225 59,225 59,225 59,225 61,800 61,800 61,800 61,800 61,800 61,800 61,800
- Seng Gelombang 7 kk BJLS 20 lbr 74,750 74,750 74,750 74,750 74,750 78,000 78,000 78,000 78,000 78,000 78,000 78,000
- Seng Gelombang 6 kk BJLS 30 lbr 86,250 86,250 86,250 86,250 86,250 90,000 90,000 90,000 90,000 90,000 90,000 90,000
- Seng Gelombang 7 kk BJLS 30 lbr 100,050 100,050 100,050 100,050 100,050 104,400 104,400 104,400 104,400 104,400 104,400 104,400
b. Seng Plat
- Seng Plat BJLS 20 m1 25,875 25,875 25,875 25,875 25,875 27,000 27,000 27,000 27,000 27,000 27,000 27,000
- Seng Plat BJLS 30 m1 34,500 34,500 34,500 34,500 34,500 36,000 36,000 36,000 36,000 36,000 36,000 36,000
- Seng Talang m1 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
c. Seng Plastik
- Seng Plastik Gelombang Besar 6 kk lbr 55,775 55,775 55,775 55,775 55,775 58,200 58,200 58,200 58,200 58,200 58,200 58,200
- Seng Plastik Gelombang Besar 7 kk lbr 70,150 70,150 70,150 70,150 70,150 73,200 73,200 73,200 73,200 73,200 73,200 73,200
- Seng Plastik Gelombang Kecil lbr 37,950 37,950 37,950 37,950 37,950 39,600 39,600 39,600 39,600 39,600 39,600 39,600
d. Metal Roof lbr 51,750 51,750 51,750 51,750 51,750 54,000 54,000 54,000 54,000 54,000 54,000 54,000
Noc Metal Roof lbr 40,250 40,250 40,250 40,250 40,250 42,000 42,000 42,000 42,000 42,000 42,000 42,000
10. BAHAN KACA
a. Kaca Bening 5 mm' lbr 287,500 287,500 287,500 287,500 287,500 300,000 300,000 300,000 300,000 300,000 300,000 300,000
b. Kaca Rayben 5 mm' lbr 327,750 327,750 327,750 327,750 327,750 342,000 342,000 342,000 342,000 342,000 342,000 342,000
c. Kaca Cermin tebal lbr 89,700 89,700 89,700 89,700 89,700 93,600 93,600 93,600 93,600 93,600 93,600 93,600
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

11. BAHAN JENDELA LOVER


a. Lover/nako 6 klip set 92,000 92,000 92,000 92,000 92,000 96,000 96,000 96,000 96,000 96,000 96,000 96,000
b. Lover/nako 8 klip set 126,500 126,500 126,500 126,500 126,500 132,000 132,000 132,000 132,000 132,000 132,000 132,000
c. Rangka Lover/nako tanpa Trali lbr 189,750 189,750 189,750 189,750 189,750 198,000 198,000 198,000 198,000 198,000 198,000 198,000

12. BAHAN PENGUNCI/PENGGANTUNG


a. Kunci Tanam bh. 143,750 143,750 143,750 143,750 143,750 150,000 150,000 150,000 150,000 150,000 150,000 150,000
b. Gembok besar bh. 51,750 51,750 51,750 51,750 51,750 54,000 54,000 54,000 54,000 54,000 54,000 54,000
c. Gembok kecil bh. 16,100 16,100 16,100 16,100 16,100 16,800 16,800 16,800 16,800 16,800 16,800 16,800
d. Kunci Laci bh. 20,125 20,125 20,125 20,125 20,125 21,000 21,000 21,000 21,000 21,000 21,000 21,000
e. Engsel
- Engsel Jendela pas. 25,875 25,875 25,875 25,875 25,875 27,000 27,000 27,000 27,000 27,000 27,000 27,000
- Engsel Pintu pas. 41,400 41,400 41,400 41,400 41,400 43,200 43,200 43,200 43,200 43,200 43,200 43,200
- Engsel Kupu-kupu ring nilon Pintu pas. 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
- Engsel Kupu-kupu ring nilon Jendela pas. 16,100 16,100 16,100 16,100 16,100 16,800 16,800 16,800 16,800 16,800 16,800 16,800
- Hak Angin Biasa pas. 13,800 13,800 13,800 13,800 13,800 14,400 14,400 14,400 14,400 14,400 14,400 14,400
- Hak Angin Lipat pas. 23,000 23,000 23,000 23,000 23,000 24,000 24,000 24,000 24,000 24,000 24,000 24,000
- Kunci Gembok bh. 29,900 29,900 29,900 29,900 29,900 31,200 31,200 31,200 31,200 31,200 31,200 31,200
- Grendel Lecil bh. 18,400 18,400 18,400 18,400 18,400 19,200 19,200 19,200 19,200 19,200 19,200 19,200
- Grendel Sedang bh. 24,150 24,150 24,150 24,150 24,150 25,200 25,200 25,200 25,200 25,200 25,200 25,200
- Grendel Besar bh. 32,775 32,775 32,775 32,775 32,775 34,200 34,200 34,200 34,200 34,200 34,200 34,200
- Tarikan jendela bh. 17,250 17,250 17,250 17,250 17,250 18,000 18,000 18,000 18,000 18,000 18,000 18,000
- Grendel rante bh. 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000

13. BAHAN SANITAIR


a. Kloset duduk porselin bh. 690,000 690,000 690,000 690,000 690,000 720,000 720,000 720,000 720,000 720,000 720,000 720,000
Kloset duduk porselin bh. 920,000 920,000 920,000 920,000 920,000 960,000 960,000 960,000 960,000 960,000 960,000 960,000
b. Kloset jongkok Keramik bh. 210,450 210,450 210,450 210,450 210,450 219,600 219,600 219,600 219,600 219,600 219,600 219,600
c. Wastafel Keramik bh. 862,500 862,500 862,500 862,500 862,500 900,000 900,000 900,000 900,000 900,000 900,000 900,000
d. Was bak/bak cuci logam 1 lobang bh. 460,000 460,000 460,000 460,000 460,000 480,000 480,000 480,000 480,000 480,000 480,000 480,000
e. Bak Mandi Feber Kotak bh. 598,000 598,000 598,000 598,000 598,000 624,000 624,000 624,000 624,000 624,000 624,000 624,000
f. Kran air plastik bh. 18,975 18,975 18,975 18,975 18,975 19,800 19,800 19,800 19,800 19,800 19,800 19,800
g. kran air kuningan bh. 57,500 57,500 57,500 57,500 57,500 60,000 60,000 60,000 60,000 60,000 60,000 60,000
h. Hans shower bh. 80,500 80,500 80,500 80,500 80,500 84,000 84,000 84,000 84,000 84,000 84,000 84,000
i. Tandon Air
- Tandon Plastik Profil Tank 400 Liter bh. 782,000 782,000 782,000 782,000 782,000 816,000 816,000 816,000 816,000 816,000 816,000 816,000
- Tandon Plastik Profil Tank 450 Liter bh. 920,000 920,000 920,000 920,000 920,000 880,000 880,000 880,000 880,000 880,000 880,000 880,000
- Tandon Plastik Profil Tank 520 Liter bh. 1,495,000 1,495,000 1,495,000 1,495,000 1,495,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000 1,430,000
- Tandon Plastik Profil Tank 1100 Liter bh. 2,070,000 2,070,000 2,070,000 2,070,000 2,070,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000 1,980,000
- Tandon Plastik Profil Tank 1200 Liter bh. 2,300,000 2,300,000 2,300,000 2,300,000 2,300,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000 2,200,000
- Tandon Plastik Profil Tank 2200 Liter bh. 4,600,000 4,600,000 4,600,000 4,600,000 4,600,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000 4,400,000
- Tandon Plastik Profil Tank 3300 Liter bh. 6,325,000 6,325,000 6,325,000 6,325,000 6,325,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000 6,050,000
- Tandon Plastik Profil Tank 5200 Liter bh. 11,500,000 11,500,000 11,500,000 11,500,000 11,500,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000 11,000,000
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

j.Bak Air Feber glass


- Bak Air Feber glass bh. 3,149,850 3,149,850 3,149,850 3,149,850 3,149,850 3,286,800 3,286,800 3,286,800 3,286,800 3,286,800 3,286,800 3,286,800
k. Pompa Dragon bh. 632,500 632,500 632,500 632,500 632,500 660,000 660,000 660,000 660,000 660,000 660,000 660,000
l. Mesin Pompa Air
- 100 Watt bh. 949,900 949,900 949,900 949,900 949,900 991,200 991,200 991,200 991,200 991,200 991,200 991,200
- 150 Watt bh. 2,329,900 2,329,900 2,329,900 2,329,900 2,329,900 2,431,200 2,431,200 2,431,200 2,431,200 2,431,200 2,431,200 2,431,200

14. BAHAN PAKU/BAUT


a. Paku
- Paku Tripleks kg. 31,625 31,625 31,625 31,625 31,625 33,000 33,000 33,000 33,000 33,000 33,000 33,000
- Paku Persegi kg. 34,500 34,500 34,500 34,500 34,500 36,000 36,000 36,000 36,000 36,000 36,000 36,000
- Paku 1/4 - 1/2 kg. 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
- Paku 1 - 3 kg. 24,725 24,725 24,725 24,725 24,725 25,800 25,800 25,800 25,800 25,800 25,800 25,800
- Paku 2 1/2 - 7 kg. 24,725 24,725 24,725 24,725 24,725 25,800 25,800 25,800 25,800 25,800 25,800 25,800
- Paku Seng Gelombang kg. 30,590 30,590 30,590 30,590 30,590 31,920 31,920 31,920 31,920 31,920 31,920 31,920
- Paku genteng metal kg. 46,000 46,000 46,000 46,000 46,000 48,000 48,000 48,000 48,000 48,000 48,000 48,000
- Paku Tembok/beton dos 39,100 39,100 39,100 39,100 39,100 40,800 40,800 40,800 40,800 40,800 40,800 40,800
- Paku Tembok/beton dos 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
- Timah Solder roll 48,875 48,875 48,875 48,875 48,875 51,000 51,000 51,000 51,000 51,000 51,000 51,000
b. Baut
- Baut + Mur f 3/8'' - 17,5 bh. 8,855 8,855 8,855 8,855 8,855 9,240 9,240 9,240 9,240 9,240 9,240 9,240
- Baut + Mur f 3/8'' - 15 bh. 10,753 10,753 10,753 10,753 10,753 11,220 11,220 11,220 11,220 11,220 11,220 11,220
- Baut + Mur f 3/8'' - 20 bh. 158,400 158,400 158,400 158,400 158,400 207,900 207,900 207,900 207,900 207,900 207,900 207,900
- Baut + Mur f 3/8'' - 30 bh. 18,975 18,975 18,975 18,975 18,975 19,800 19,800 19,800 19,800 19,800 19,800 19,800
- Baut bh. 12,650 12,650 12,650 12,650 12,650 13,200 13,200 13,200 13,200 13,200 13,200 13,200
- But Mur bh. 18,975 18,975 18,975 18,975 18,975 19,800 19,800 19,800 19,800 19,800 19,800 19,800
- Ring bh. 1,150 1,150 1,150 1,150 1,150 1,200 1,200 1,200 1,200 1,200 1,200 1,200

15. BAHAN KAWAT BAJA


a. Kawat Ikat kg. 40,250 40,250 40,250 40,250 40,250 42,000 42,000 42,000 42,000 42,000 42,000 42,000
b. Kawat Duri
- Kawat Duri Kecil roll 230,000 230,000 230,000 230,000 230,000 240,000 240,000 240,000 240,000 240,000 240,000 240,000
- Kawat Duri Besar roll 345,000 345,000 345,000 345,000 345,000 360,000 360,000 360,000 360,000 360,000 360,000 360,000
c. Kawat Ram m1 31,625 31,625 31,625 31,625 31,625 33,000 33,000 33,000 33,000 33,000 33,000 33,000
d. Kawat Harmonika m1 31,625 31,625 31,625 31,625 31,625 33,000 33,000 33,000 33,000 33,000 33,000 33,000
e. Kawat Nyamuk Plastik m1 17,338 17,338 17,338 17,338 17,338 18,092 18,092 18,092 18,092 18,092 18,092 18,092
f. Kawat Nyamuk Besi m1 34,578 34,578 34,578 34,578 34,578 36,081 36,081 36,081 36,081 36,081 36,081 36,081
g. Kawat Ayakan m1 25,875 25,875 25,875 25,875 25,875 27,000 27,000 27,000 27,000 27,000 27,000 27,000

16. BAHAN BESI BETON/BAJA


a. Besi Beton Bulat
- Diamater 6 mm btg. 57,500 57,500 57,500 57,500 57,500 60,000 60,000 60,000 60,000 60,000 60,000 60,000
- Diamater 8 mm btg. 89,125 89,125 89,125 89,125 89,125 93,000 93,000 93,000 93,000 93,000 93,000 93,000
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

- Diamater 10 mm btg. 112,125 112,125 112,125 112,125 112,125 117,000 117,000 117,000 117,000 117,000 117,000 117,000
- Diamater 12 mm btg. 152,950 152,950 152,950 152,950 152,950 159,600 159,600 159,600 159,600 159,600 159,600 159,600
- Diamater 16 mm btg. 253,000 253,000 253,000 253,000 253,000 264,000 264,000 264,000 264,000 264,000 264,000 264,000
- Diamater 19 mm btg. 315,100 315,100 315,100 315,100 315,100 328,800 328,800 328,800 328,800 328,800 328,800 328,800

b. Besi Beton Ulir


- Diamater 13 mm btg. 170,200 170,200 170,200 170,200 170,200 177,600 177,600 177,600 177,600 177,600 177,600 177,600
- Diamater 16 mm btg. 279,450 279,450 279,450 279,450 279,450 291,600 291,600 291,600 291,600 291,600 291,600 291,600
- Diamater 19 mm btg. 361,100 361,100 361,100 361,100 361,100 376,800 376,800 376,800 376,800 376,800 376,800 376,800

17. BAHAN PIPA UNTUK PEKERJAAN


BANGUNAN
a. Pipa PVC
- Diameter 1/2" btg. 34,500 34,500 34,500 34,500 34,500 36,000 36,000 36,000 36,000 36,000 36,000 36,000
- Diameter 3/4" btg. 43,125 43,125 43,125 43,125 43,125 45,000 45,000 45,000 45,000 45,000 45,000 45,000
- Diameter 1" btg. 53,590 53,590 53,590 53,590 53,590 55,920 55,920 55,920 55,920 55,920 55,920 55,920
- Diameter 1 1/2" btg. 100,625 100,625 100,625 100,625 100,625 105,000 105,000 105,000 105,000 105,000 105,000 105,000
- Diameter 2" btg. 123,625 123,625 123,625 123,625 123,625 129,000 129,000 129,000 129,000 129,000 129,000 129,000
- Diameter 2 1/2" btg. 161,000 161,000 161,000 161,000 161,000 168,000 168,000 168,000 168,000 168,000 168,000 168,000
- Diameter 3" btg. 172,500 172,500 172,500 172,500 172,500 180,000 180,000 180,000 180,000 180,000 180,000 180,000
- Diameter 4" btg. 276,000 276,000 276,000 276,000 276,000 288,000 288,000 288,000 288,000 288,000 288,000 288,000
b. Pipa GIV
- Diameter 1/2" btg. 152,950 152,950 152,950 152,950 152,950 159,600 159,600 159,600 159,600 159,600 159,600 159,600
- Diameter 3/4" btg. 227,700 227,700 227,700 227,700 227,700 237,600 237,600 237,600 237,600 237,600 237,600 237,600
- Diameter 1" btg. 342,700 342,700 342,700 342,700 342,700 357,600 357,600 357,600 357,600 357,600 357,600 357,600
- Diameter 1 1/2" btg. 420,900 420,900 420,900 420,900 420,900 439,200 439,200 439,200 439,200 439,200 439,200 439,200
- Diameter 2" btg. 547,400 547,400 547,400 547,400 547,400 571,200 571,200 571,200 571,200 571,200 571,200 571,200
- Diameter 2 1/2" btg. 655,500 655,500 655,500 655,500 655,500 684,000 684,000 684,000 684,000 684,000 684,000 684,000
- Diameter 3" btg. 885,500 885,500 885,500 885,500 885,500 924,000 924,000 924,000 924,000 924,000 924,000 924,000

18. BAHAN CAT


a. Cat Tembok
- Cat Tembok 5 kg klg. 61,295 61,295 61,295 61,295 61,295 63,960 63,960 63,960 63,960 63,960 63,960 63,960
- Cat Tembok 20 kg klg. 184,000 184,000 184,000 184,000 184,000 192,000 192,000 192,000 192,000 192,000 192,000 192,000
b. Cat Kayu
- Cat Dasar kg. 45,425 45,425 45,425 45,425 45,425 47,400 47,400 47,400 47,400 47,400 47,400 47,400
- Cat Kilap kg. 60,375 60,375 60,375 60,375 60,375 63,000 63,000 63,000 63,000 63,000 63,000 63,000
c. Cat Aluminium kg. 86,250 86,250 86,250 86,250 86,250 90,000 90,000 90,000 90,000 90,000 90,000 90,000
d. Cat genteng kg. 27,313 27,313 27,313 27,313 27,313 28,500 28,500 28,500 28,500 28,500 28,500 28,500
e. Cat Besi
- Cat Besi kg. 57,500 57,500 57,500 57,500 57,500 60,000 60,000 60,000 60,000 60,000 60,000 60,000
- Menie ltr. 40,250 40,250 40,250 40,250 40,250 42,000 42,000 42,000 42,000 42,000 42,000 42,000
f. Plamur Tembok kg. 80,500 80,500 80,500 80,500 80,500 84,000 84,000 84,000 84,000 84,000 84,000 84,000
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

g. Residu kg. 144,900 144,900 144,900 144,900 144,900 151,200 151,200 151,200 151,200 151,200 151,200 151,200
h. Teak oil ltr. 35,650 35,650 35,650 35,650 35,650 37,200 37,200 37,200 37,200 37,200 37,200 37,200
i. Plitur kg. 69,000 69,000 69,000 69,000 69,000 72,000 72,000 72,000 72,000 72,000 72,000 72,000
j. Dempul kg. 37,375 37,375 37,375 37,375 37,375 39,000 39,000 39,000 39,000 39,000 39,000 39,000
k. Minyak Cat/Thinner ltr. 37,375 37,375 37,375 37,375 37,375 39,000 39,000 39,000 39,000 39,000 39,000 39,000
l. Amplas Kayu m' 11,500 11,500 11,500 11,500 11,500 12,000 12,000 12,000 12,000 12,000 12,000 12,000
m. Lem Kayu kg. 25,875 25,875 25,875 25,875 25,875 27,000 27,000 27,000 27,000 27,000 27,000 27,000
n. Kuas rol bh. 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
o. Kuas Biasa
- Kuas 1" bh. 6,900 6,900 6,900 6,900 6,900 7,200 7,200 7,200 7,200 7,200 7,200 7,200
- Kuas 2" bh. 13,225 13,225 13,225 13,225 13,225 13,800 13,800 13,800 13,800 13,800 13,800 13,800
- Kuas 2,5" bh. 17,250 17,250 17,250 17,250 17,250 18,000 18,000 18,000 18,000 18,000 18,000 18,000
- Kuas 3" bh. 19,550 19,550 19,550 19,550 19,550 20,400 20,400 20,400 20,400 20,400 20,400 20,400
18. BAHAN INSTALASI LISTRIK
a. Lampu TL Lengkap
- Lampu TL Lengkap 20 watt bh. 63,250 63,250 63,250 63,250 63,250 66,000 66,000 66,000 66,000 66,000 66,000 66,000
- Lampu TL Lengkap 40 watt bh. 74,750 74,750 74,750 74,750 74,750 78,000 78,000 78,000 78,000 78,000 78,000 78,000
- Lampu TL Lengkap 60 watt bh. 86,250 86,250 86,250 86,250 86,250 90,000 90,000 90,000 90,000 90,000 90,000 90,000
b. Lampu SL
- Lampi SL 5 Watt bh. 28,750 28,750 28,750 28,750 28,750 30,000 30,000 30,000 30,000 30,000 30,000 30,000
- Lampi SL 8 Watt bh. 32,200 32,200 32,200 32,200 32,200 33,600 33,600 33,600 33,600 33,600 33,600 33,600
- Lampi SL 11 Watt bh. 34,500 34,500 34,500 34,500 34,500 36,000 36,000 36,000 36,000 36,000 36,000 36,000
- Lampi SL 14 Watt bh. 37,950 37,950 37,950 37,950 37,950 39,600 39,600 39,600 39,600 39,600 39,600 39,600
- Lampi SL 18 Watt bh. 43,988 43,988 43,988 43,988 43,988 45,900 45,900 45,900 45,900 45,900 45,900 45,900
- Lampi SL 23 Watt bh. 50,025 50,025 50,025 50,025 50,025 52,200 52,200 52,200 52,200 52,200 52,200 52,200
c. Lampu Pijar
- Lampu Pijar Merah bh. 5,750 5,750 5,750 5,750 5,750 6,000 6,000 6,000 6,000 6,000 6,000 6,000
- Lampu Pijar Kuning bh. 5,750 5,750 5,750 5,750 5,750 6,000 6,000 6,000 6,000 6,000 6,000 6,000
- Lampu Pijar Hijau bh. 5,750 5,750 5,750 5,750 5,750 6,000 6,000 6,000 6,000 6,000 6,000 6,000
d. Sekering Otomat Unit 82,800 82,800 82,800 82,800 82,800 86,400 86,400 86,400 86,400 86,400 86,400 86,400
e. Sekering Box bh. 71,300 71,300 71,300 71,300 71,300 74,400 74,400 74,400 74,400 74,400 74,400 74,400
f. Kabel NYM
- Kabel NYM 1 x 2,5 mm m1 8,050 8,050 8,050 8,050 8,050 8,400 8,400 8,400 8,400 8,400 8,400 8,400
- Kabel NYM 2 x 2,5 mm m1 13,110 13,110 13,110 13,110 13,110 13,680 13,680 13,680 13,680 13,680 13,680 13,680
- Kabel NYM 3 x 2,6 mm m1 17,250 17,250 17,250 17,250 17,250 18,000 18,000 18,000 18,000 18,000 18,000 18,000
g. Kabel NYA
- Kabel NYA 1 x 1,5 mm Merah m1 4,025 4,025 4,025 4,025 4,025 4,200 4,200 4,200 4,200 4,200 4,200 4,200
- Kabel NYM 1 x 1,5 mm Hitam m1 4,025 4,025 4,025 4,025 4,025 4,200 4,200 4,200 4,200 4,200 4,200 4,200
- Kabel NYM 1 x 2,5 mm Merah m1 5,175 5,175 5,175 5,175 5,175 5,400 5,400 5,400 5,400 5,400 5,400 5,400
- Kabel NYM 3 x 2,5 mm Hitam m1 5,175 5,175 5,175 5,175 5,175 5,400 5,400 5,400 5,400 5,400 5,400 5,400
h. Saklar Tunggal bh. 21,563 21,563 21,563 21,563 21,563 22,500 22,500 22,500 22,500 22,500 22,500 22,500
i. Saklar Ganda bh. 25,875 25,875 25,875 25,875 25,875 27,000 27,000 27,000 27,000 27,000 27,000 27,000
j. Stop Kontak bh. 20,125 20,125 20,125 20,125 20,125 21,000 21,000 21,000 21,000 21,000 21,000 21,000
LOKASI
DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK DISTRIK
No. URAIAN SAT. KET
SUPNIR WAWARBOMI WAIGEO WAIGEO KEP. 9 KEPULAUAN AYAU KOFIAU MISOOL MISOOL MISOOL MISOOL
BARAT BARAT KEP. AYAU UTARA TIMUR SELATAN BARAT
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

19. BAHAN ASPAL kg 18,400 18,400 18,400 18,400 18,400 19,200 19,200 19,200 19,200 19,200 19,200 19,200

20. BAHAN BAHAN BAKAR DAN OLIE


a. Minyak Tanah ltr 13,455 13,455 13,455 13,455 13,455 14,040 14,040 14,040 14,040 14,040 14,040 14,040
b. Bensin ltr 12,995 12,995 12,995 12,995 12,995 13,560 13,560 13,560 13,560 13,560 13,560 13,560
c. Solar ltr 13,800 13,800 13,800 13,800 13,800 14,400 14,400 14,400 14,400 14,400 14,400 14,400
d. Minyak Pelumas ltr 46,000 46,000 46,000 46,000 46,000 48,000 48,000 48,000 48,000 48,000 48,000 48,000

B. DAFTAR HARGA UPAH


1 Mandor Lapangan H/O 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 120,000 8 Jam Kerja/Hr
2 Mekanik H/O 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 8 Jam Kerja/Hr
3 Mekanik Pembantu H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
4 Tukang Kepala H/O 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 110,000 8 Jam Kerja/Hr
5 Tukang Kayu H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
6 Tukang Batu H/O 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 8 Jam Kerja/Hr
7 Tukang Besi H/O 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 8 Jam Kerja/Hr
8 Tukang Cat H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
9 Tukang Gali H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
10 Tukang Las H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
11 Tukang Listrik H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
12 Tukang Pipa H/O 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 100,000 8 Jam Kerja/Hr
13 Operator Terlatih H/O 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 105,000 8 Jam Kerja/Hr
14 Pembantu Operator H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
15 Supir H/O 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 95,000 8 Jam Kerja/Hr
16 Pembantu Supir / Kenek H/O 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 85,000 8 Jam Kerja/Hr
17 Pekerja H/O 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 80,000 8 Jam Kerja/Hr

KETERANGAN :
- Harga tersebut di atas adalah harga di lokasi pekerjaan pada masing-masing Ibukota Distrik dan untuk ke Kampung-Kampung disesuaikan. Waisai, 16 Januari 2012
- Harga tersebut di atas termasuk penggunaan alat-alat pendukung.

MENYETUJUI :
BUPATI RAJA AMPAT

Drs. MARCUS WANMA, M.Si.


HITUNGAN VOLUME REHAB RUMAH TINGGAL ( IBU ELSA )

I. PEKRJAAN PERSIAPAN DAN PENDAHULUAN


1 Pembersihan lokasi panjang Jumlah Lebar m'
Bangunan 1 15.00 - 11.00 -
Jumlah

2 Pas. Bouwplank panjang Lebar


Bangunan 1 15.00 11.00
Jumlah
II. PEKRJAAN TANAH DAN PONDASI

1 Galian Tanah panjang Jumlah Tinggi m'


Bangunan 1 0.75 0.80 63.25
1.20 1.85 13.20
Jumlah

2 Urugan Tanah Kembali Jumlah

3 Pasir alas pondasi panjang Tinggi m'


Bangunan 1 0.75 0.10 63.25
1.20 0.10 13.20
Jumlah

4 Pasang Batu Kosong panjang Tinggi m'


Bangunan 1 0.75 0.20 63.25
Jumlah

5 Pasang Batu Gunung Penampang Jumlah Tinggi m'


Bangunan 1 0.45 0.55 63.25
Tangga 0.45 0.55 8.50
Jumlah
III. PEKRJAAN BETON

1 Pasang Sloof 25/30 1:2:3 Penampang Tinggi m'


Bangunan 1 0.05 - 63.25
Jumlah

2 Pasang Kolom 40/40 1:2:3 Penampang Tinggi Jumlah


Kolom 30/30 Bangunan 1 0.16 7.00 11.00
- - -
Jumlah
Pasang Kolom 15/15 1:2:3
Kolom 15/15 Bangunan 1 0.02 3.50 18.00
Jumlah

3 Ringbalok 1:2:3 Penampang Tinggi m'


Ringbalok 15/15 Bangunan 1 0.03 - 63.25
Jumlah

4 Pondasi Telapak 1:2:3 (Floor Plat) Penampang Tinggi m'


0.09 1.50 11.00
1.44 0.30 11.00
Jumlah

5 Cor Balok 1:2:3 Penampang Tinggi m'


Balok 30/50 0.15 - 28.00
Balok 20/40 0.08 - 31.75
Balok 15/20 0.03 - 20.50
Jumlah

6 Cor Balok Knopy 1:2:3 Penampang Tinggi m'


Balkon 0.15 - 11.25
Knopy Atasan Jendela & Pintu
0.06 - 76.85
Profil dinding luar tangga 0.01 - 5.92
Dinding samping 0.06 - 2.00
Jumlah

7 Cor Plat Lantai 1:2:3 Luasan (PxL) Tinggi m'


Rg tidur 2 - Rg tidur 3 40.85 0.10 -
Rg Service Area - Rg Tidur 35.69 0.10 -
Batas Balkon 12.50 0.10 -
Jumlah

8 Cor Tangga 1:2:3 Luasan (PxL) Tinggi m'


Antrede & Oftrede 10.40 0.10 -
Ibu Tangga 1.79 0.10 -
Lantai Bordes 4.13 0.10 -
Balok Bordes 20/25 0.05 - 8.50
Kolom 15/15 0.02 - 6.88
Jumlah

9 Cor Talang Beton 1:2:3 Panjang Tinggi m'


Bangunan 1 1.80 0.10 6.65
Jumlah
IV. PEKRJAAN DINDING & LANTAI
1 Pasang Dinding Panjang Penampang Tinggi Jumlah
Bangunan 1
Sumbu Datar Lantai 1 22.41 3.50 -
1.77 1.50
Kolom 40/40 Depan Dinding Tangga 0.40 7.00
Sumbu Datar Lantai 2 25.48 3.50 -
Dinding Balkon 11.61 0.50
Dinding Segitiga 7.40 0.50 2.60
Jumlah A

Panjang Tebal Tinggi Jumlah


Bangunan 1
Sumbu Tegak Lantai 1 27.26 3.50 -
Sumbu Tegak Lantai 2 28.01 3.50 -
Jumlah B
Total Jumlah (A+B)

Panjang Tebal Tinggi Jumlah


Pengurangan
Bangunan 1 (Lantai 1 & Lantai 2)
PJ2 A 2.65 2.15 1.00
1.50 0.50 1.00
PJ2 B 1.50 2.15 1.00
0.90 2.65 1.00
J2 1.55 2.15 6.00
JK Tangga 0.55 3.23 2.00
V1 0.40 0.60 3.00
V2 1.55 0.60 1.00
V3 2.30 0.60 2.00
P1A 0.80 2.10 3.00
P1B 0.90 2.10 7.00
Jumlah C

Total Jumlah ((A+B)-C)

2 Plesteran Dinding

3 Beton Tumbuk 7 cm Luasan (PxL) Jumlah Tinggi m'


Bangunan 1
Lantai 1
Ruang Setrika / Rg Tidur Pembantu 16.00 - 0.05 -
WC / KM A 3.00 - 0.05 -
Ruang Cuci 16.00 - 0.05 -
5.00 - 0.05 -
Ruang Tidur 13.00 - 0.05 -
Dapur 8.00 - 0.05 -
4.50 - 0.05 -
WC / KM B 3.50 - 0.05 -
Ruang Tangga 11.00 - 0.05 -
Rabat (Selasar) 39.46 - 0.05 -
Jumlah A

Total Jumlah A+B

4 Urugan Tanah Dibawah lantai Luasan (PxL) Jumlah Tinggi m'


Bangunan 1
Lantai 1
Ruang Setrika / Rg Tidur Pembantu 16.00 - 0.15 -
WC / KM A 3.00 - 0.15 -
Ruang Cuci 16.00 - 0.15 -
5.00 - 0.15 -
Ruang Tidur 13.00 - 0.15 -
Dapur 8.00 - 0.15 -
4.50 - 0.15 -
WC / KM B 3.50 - 0.15 -
Ruang Tangga 11.00 - 0.15 -
Rabat (Selasar) 39.46 - 0.15 -
Jumlah A

Total Jumlah A+B

5 Urugan Pasir Dibawah lantai Luasan (PxL) Jumlah Tinggi m'


Bangunan 1
Lantai 1
Ruang Setrika / Rg Tidur Pembantu 16.00 - 0.10 -
WC / KM A 3.00 - 0.05 -
Ruang Cuci 16.00 - 0.10 -
5.00 - 0.10 -
Ruang Tidur 13.00 - 0.10 -
Dapur 8.00 - 0.10 -
4.50 - 0.10 -
WC / KM B 3.50 - 0.05 -
Ruang Tangga 11.00 - 0.10 -
Rabat (Selasar) 39.46 - 0.05 -
Jumlah A

Total Jumlah A+B


6 Pas Lantai Keramik 40/40 Panjang Jumlah Lebar m'
Bangunan 1
Lantai 1
Ruang Setrika / Rg Tidur Pembantu 4.00 - 4.00 -
Ruang Cuci 4.00 - 4.00 -
2.50 - 2.00 -
Ruang Tidur 3.25 - 4.00 -
Dapur 2.00 - 4.00 -
2.00 - 2.25 -
Ruang Tangga 2.75 4.00
Rabat (Selasar) 32.88 - 1.20 -
Jumlah A
Lantai 2
Ruang Tidur 3 4.00 - 4.00 -
Ruang Service Area 4.00 - 4.00 -
2.50 - 2.00 -
1.25 - 4.00 -
Ruang Tidur 2 3.25 - 4.00 -
Ruang Tidur 3 2.75 - 4.00 -
Balkon 1.25 2.00 4.00 -
1.25 - 2.00 -
Jumlah B

Total Jumlah A+B+C

7 Pas Lantai & Dinding Keramik 20/20 Panjang Jumlah Lebar Tinggi
Bangunan 1 Lantai 1
WC / KM A
Lantai 2.00 - 1.50 -
Dinding 2.00 1.50 1.80
WC / KM B
Lantai 2.00 - 1.75 -
Dinding 2.00 - 1.75 1.80
Bangunan 1 Lantai 2
WC / KM C
Lantai 2.00 - 1.50 -
Dinding 2.00 1.50 1.80
Tangga
0.30 14.00 1.30 -
0.25 16.00 1.30 -
1.50 - 2.60 -
Jumlah A
Pengurangan kusen
P1B 0.80 3.00 - 1.80
Dudukan Kloset 0.70 3.00 0.70 -
1.40 3.00 - 0.20
Jumlah B

Total Jumlah A-B


V. PEKRJAAN ATAP
Panjang Jumlah Penampang m'
1 Pasang Kuda-kuda 5/10 10% Kayu Hilang
KK1 34.55 4.00 0.01 124.38
KK1/2 A 11.95 3.00 0.01 32.27
KK1/2 B 21.82 3.00 0.01 58.91
Jumlah

2 Pasang Gording 5/10 Panjang Jumlah Penampang m'


Bangunan 1 10% Kayu Hilang
Atap Type A 66.67 2.00 0.01 120.01
Atap Type B 32.59 2.00 0.01 58.66
Atap Type C 50.91 1.00 0.01 45.82
Atap Type D 26.28 1.00 0.01 23.65

Jumlah

2 Pasang Kasau 5/7 Panjang Jumlah Penampang m'


Bangunan 1 10% Kayu Hilang
Atap Type A 12.72 2.00 0.004 22.90
Atap Type B 22.96 1.00 0.004 20.66
Atap Type C 38.55 2.00 0.004 69.39
Atap Type D 12.70 1.00 0.004 11.43
Jumlah A
Pasang Kasau 3/4
Bangunan 1 10% Kayu Hilang
Atap Type A 66.67 4.00 0.001 240.01
Atap Type B 32.59 4.00 0.001 117.32
Atap Type C 50.91 2.00 0.001 91.64
Atap Type D 26.28 2.00 0.001 47.30
Jumlah B

Total Jumlah A+B

3 Atap seng Panjang Jumlah Tinggi m'


Bangunan 1
Atap Sumbu datar 3.91 2.00 4.08 -
10.93 6.14
5.37 6.14
5.37 6.14
4.84 6.14
Atap Sumbu Tegak 7.07 - 4.08 -
10.64 6.14
5.24 6.05
Jumlah A

Total Jumlah A+B

4 Bubungan Panjang Jumlah Penampang m'


Bangunan 1 29.37 - - -

5 Pasang Listplank Panjang Jumlah Penampang m'


Bangunan 1 59.64 - - -

6 Pas Rangka & Plafond Panjang Jumlah Lebar m'


Bangunan 1
Lantai 1
Ruang Setrika / Rg Tidur Pembantu 4.00 - 4.00 -
Ruang Cuci 4.00 - 4.00 -
2.50 - 2.00 -
Ruang Tidur 3.25 - 4.00 -
Dapur 2.00 - 4.00 -
2.00 - 2.25 -
Ruang Tangga 2.75 4.00
Rabat (Selasar) 32.88 - 1.20 -
Jumlah
Lantai 2
Ruang Tidur 3 4.00 - 4.00 1.80
Ruang Service Area 4.00 - 4.00 -
2.50 - 2.00 -
1.25 - 4.00 -
Ruang Tidur 2 3.25 - 4.00 -
Ruang Tidur 3 2.75 - 4.00 -
Balkon 1.25 2.00 4.00 -
1.25 - 2.00 -
Jumlah

Jumlah A

Panjang Jumlah Lebar Tinggi


Bangunan 1 Lantai 1
WC / KM A
Lantai 2.00 - 1.50 -
WC / KM B
Lantai 2.00 - 1.75 -
Bangunan 1 Lantai 2
WC / KM C
Lantai 2.00 - 1.50 -
Ruang Tangga
2.75 - 4.00 -

Jumlah B
Total Jumlah A+B
VI. PEKRJAAN LABURAN DAN PENGECATAN

1 Cat / Laburan Tembok Luasan Jumlah sisi Lebar Tinggi

2 Cat Meni Kusen Pintu, Jendela & Ventilasi


Panjang Tebal /lebar Tinggi Jumlah

PJ2 B 9.18 0.10 - 1.00


J2 7.40 0.10 - 6.00
JK Tangga 7.56 0.10 - 2.00
V1 2.00 0.10 - 3.00
V2 4.30 0.10 - 1.00
V3 5.80 0.10 - 2.00
P1A 5.00 0.10 - 3.00
P1B 5.10 0.10 - 6.00
Jumlah C

3 Cat Kilap Kusen Pintu, Jendela & Ventilasi Luas Jmlh Kusen m' Tinggi
Bid. Yg dicat
Bangunan 1 & 2
Kusen PJ2 B 0.20 1.00 15.55 -
Kusen J2 0.20 6.00 10.80 -
JK Tangga 0.30 2.00 14.60 -
V1 0.20 3.00 1.80 -
V2 0.20 1.00 4.60 -
V3 0.20 2.00 6.60 -
P1A 0.20 3.00 4.90 -
P1B 0.20 6.00 7.00 -
Jumlah A
Listplank
Bangunan 1 0.43 - 59.64 -
Jumlah B
Total Jumlah A+B =

4 Cat Kilap Daun Pintu dan Jendela Luas Jumlah Jumlah sisi Tinggi
Bidang Cat Daun Pintu
Bangunan 1 & 2 ( P x L)
Kusen PJ2 B 1.64 1.00 2.00 -
P1B 1.64 6.00 2.00 -
Jumlah A

Luas Jumlah Jumlah sisi Jumlah


Bidang Cat Type Daun
Bangunan 1 & 2 ( P x L) Jendela Jendela
Kusen PJ2 B 1.05 1.00 2.00 2.00
0.35 1.00 2.00 2.00
0.40 1.00 2.00 1.00
Kusen J2 1.05 6.00 2.00 2.00
0.35 6.00 2.00 2.00
V1 0.35 3.00 2.00 1.00
V2 0.35 1.00 2.00 2.00
V3 0.35 2.00 2.00 3.00
P1B 0.40 6.00 2.00 1.00

Total Jumlah A+B =

VII. PEKRJAAN PINTU DAN JENDELA

1 Pas Kusen Pintu, Jendela 5/10 (Kayu Klas 1) Penampang Jumlah m' Kayu Hilang
Bangunan 1 & 2 10%
Kusen PJ2 B 0.01 1.00 15.55 14.00
Kusen J2 0.01 6.00 10.80 9.72
JK Tangga 0.01 2.00 14.60 13.14
V1 0.01 3.00 1.80 1.62
V2 0.01 1.00 4.60 4.14
V3 0.01 2.00 6.60 5.94
P1A 0.01 3.00 4.90 4.41
P1B 0.01 6.00 7.00 6.30
Jumlah A
Telinga Kusen
Kusen PJ2 B 0.01 1.00 0.30 0.27
Kusen J2 0.01 6.00 0.40 0.36
JK Tangga 0.01 2.00 0.40 0.36
V1 0.01 3.00 0.40 0.36
V2 0.01 1.00 0.40 0.36
V3 0.01 2.00 0.40 0.36
P1A 0.01 3.00 0.20 0.18
P1B 0.01 6.00 0.20 0.18
Jumlah B

Total Jumlah A+B =

2 Pas Pintu Panel Panjang Jumlah m2 Kayu Hilang


Bangunan 1 & 2 ( P x L) Daun Pintu 10%
Kusen PJ2 B 1.64 1.00 1.64 1.48
P1B 1.64 6.00 1.64 1.48
Jumlah

3 Pas Pintu Lapis Seng Panjang Jumlah m2 Kayu Hilang


Bangunan 1 ( P x L) Daun Pintu 10%
P1A 1.44 3.00 1.44 1.29
Jumlah

4 Pas Jendela Kayu Klas 1 + Kaca Ryben 5 mm Panjang Jumlah Lebar Jumlah
Bangunan 1 & 2 Type Jendela Daun Jendala
Kusen PJ2 B 1.50 1.00 0.70 2.00
0.50 1.00 0.70 2.00
0.50 1.00 0.80 1.00
Kusen J2 1.50 6.00 0.70 2.00
0.50 6.00 0.70 2.00
V1 0.50 3.00 0.70 1.00
V2 0.50 1.00 0.70 2.00
V3 0.50 2.00 0.70 3.00
P1B 0.50 6.00 0.80 1.00
Jumlah

5 Pas Kaca Mati Ryben 5 mm Panjang Jumlah Lebar Jumlah


Bangunan 1 & 2 Type Jendela Daun Jendala
JK Tangga 3.10 2.00 0.40 -
Jumlah

VIII. PEKERJAAN PENGANTUNG DAN PENGUNCI

1 Pas Kunci Tanam Biasa Panjang Jumlah m2 Kayu Hilang


Bangunan 1 & 2 ( P x L) Daun Pintu 10%
Kusen PJ2 A - - - -
Kusen PJ2 B - 1.00 - -
P1A - 3.00 - -
P1B - 6.00 - -
Jumlah
2 Pas Engsel Pintu Panjang Jumlah m2 Jumlah
Bangunan 1 & 2 ( P x L) Daun Pintu Engsel Pintu
Kusen PJ2 A - - - -
Kusen PJ2 B - 1.00 - 3.00
P1A - 3.00 - 3.00
P1B - 6.00 - 3.00
Jumlah

3 Pas Engsel Jendela Panjang Jumlah Jumlah Jumlah


Bangunan 1 & 2 Type Jendela Engsel Jdl Daun Jendela
Kusen PJ2 B - 1.00 2.00 2.00
- 1.00 2.00 2.00
- 1.00 2.00 1.00
Kusen J2 - 6.00 2.00 2.00
- 6.00 2.00 2.00
V1 - 3.00 2.00 1.00
V2 - 1.00 2.00 2.00
V3 - 2.00 2.00 3.00
P1B - 6.00 2.00 1.00
Jumlah

4 Pas Grendel Pintu Panjang Jumlah m2 Jumlah


Bangunan 1 & 2 ( P x L) Daun Pintu Grendel Pintu
Kusen PJ2 B - 1.00 - -
P1A - 3.00 - 1.00
P1B - 6.00 - -
Jumlah A

Pas Grendel jendela Panjang Jumlah Jumlah Jumlah


Bangunan 1 & 2 Type Jendela Grendel Daun Jendela
Kusen PJ2 B - 1.00 1.00 2.00
- 1.00 1.00 2.00
- 1.00 1.00 1.00
Kusen J2 - 6.00 1.00 2.00
- 6.00 1.00 2.00
V1 - 3.00 1.00 1.00
V2 - 1.00 1.00 2.00
V3 - 2.00 1.00 3.00
P1B - 6.00 1.00 1.00
Jumlah B

Total Jumlah A+B =

5 Pas Hak Angin jendela Panjang Jumlah Jumlah Jumlah


Bangunan 1 & 2 Type Jendela Hak Angin Daun Jendela
Kusen PJ2 B - 1.00 1.00 2.00
- 1.00 1.00 2.00
- 1.00 1.00 1.00
Kusen J2 - 6.00 1.00 2.00
- 6.00 1.00 2.00
V1 - 3.00 1.00 1.00
V2 - 1.00 1.00 2.00
V3 - 2.00 1.00 3.00
P1B - 6.00 1.00 1.00
Jumlah

6 Pas Tarikan Pintu Panjang Jumlah m2 Jumlah


Bangunan 1 & 2 ( P x L) Daun Pintu Tarikan Pintu
Kusen PJ2 B - 1.00 - 1.00
P1A - 3.00 - 1.00
P1B - 6.00 - 1.00
Jumlah A

Pas Tarikan jendela Panjang Jumlah Jumlah Jumlah


Bangunan 1 & 2 Type Jendela Tarikan Daun Jendela
Kusen PJ2 B - 1.00 1.00 2.00
- 1.00 1.00 2.00
- 1.00 1.00 1.00
Kusen J2 - 6.00 1.00 2.00
- 6.00 1.00 2.00
V1 - 3.00 1.00 1.00
V2 - 1.00 1.00 2.00
V3 - 2.00 1.00 3.00
P1B - 6.00 1.00 1.00
Jumlah B

Total Jumlah A+B =

IX. PEKERJAAN INSTALASI LISTRIK

1 Pas Instalasi Titik Penerangan Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Rg Setrika - Rg Tidur Pembantu - 2.00 - -
Km / WC A - 1.00 - -
Rg Cuci - 2.00 - -
Rg Tidur - 1.00 - -
Km / WC B - 1.00 - -
Dapur - 2.00 - -
Rg Tangga - 1.00 - -
Selasar - 2.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Rg Tidur 1 - 1.00 - -
Rg Tidur 2 - 1.00 - -
Rg Tidur 3 - 1.00 - -
Rg Service Area - 2.00 - -
Km / WC B - 1.00 - -
Balkon - 2.00 - -
Jumlah B

Total Jumlah (A+B) =

2 Pas Saklar Tunggal Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Km / WC A - 1.00 - -
Rg Cuci - 2.00 - -
Rg Tidur - 1.00 - -
Km / WC B - 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Rg Tidur 1 - 1.00 - -
Rg Tidur 2 - 1.00 - -
Rg Tidur 3 - 1.00 - -
Rg Service Area - 2.00 - -
Km / WC B - 1.00 - -
Balkon - 2.00 - -
Jumlah B

Total Jumlah A+B =

3 Pas Saklar Ganda Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Rg Setrika - Rg Tidur Pembantu - 1.00 - -
Dapur - 1.00 - -
Rg Tangga - 1.00 - -
Selasar - 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Rg Service Area - 1.00 - -
Balkon - 1.00 - -
Jumlah A

Total Jumlah A+B =

4 Pas Stop Kontak Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Rg Setrika - Rg Tidur Pembantu - 2.00 - -
Rg Cuci - 2.00 - -
Rg Tidur - 1.00 - -
Dapur - 2.00 - -
Rg Tangga - 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Rg Tidur 1 - 1.00 - -
Rg Tidur 2 - 1.00 - -
Rg Tidur 3 - 1.00 - -
Rg Service Area - 2.00 - -
Balkon - 1.00 - -
Jumlah B

Total Jumlah (A+B) =

5 Pas Lampu SL 18 Watt Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Rg Setrika - Rg Tidur Pembantu - 2.00 - -
Rg Cuci - 2.00 - -
Rg Tidur - 1.00 - -
Dapur - 2.00 - -
Rg Tangga - 2.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Rg Tidur 1 - 1.00 - -
Rg Tidur 2 - 1.00 - -
Rg Tidur 3 - 1.00 - -
Rg Service Area - 2.00 - -
Jumlah A

Total Jumlah (A+B+C) =

6 Pas Lampu SL 11 Watt Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Km / WC A - 1.00 - -
Km / WC B - 1.00 - -
Selasar - 2.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Km / WC B - 1.00 - -
Balkon - 3.00 - -
Jumlah B
Total Jumlah (A+B+C) =

7 Pas Box Sekring Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) - 1.00 - -
Bangunan 1 (Lantai 2) - 1.00 - -
Jumlah A

X. PEKERJAAN INSTALASI AIR

1 Pas Kloset Jongkok Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Km / WC A - 1.00 - -
Km / WC B - 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Km / WC B - 1.00 - -
Jumlah B

Total Jumlah (A+B) =

2 Pas Floor Drain Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Km / WC A - 1.00 - -
Km / WC B - 1.00 - -
Rg Cuci - 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Km / WC B - 1.00 - -
Jumlah B

Total Jumlah (A+B) =

3 Pas Kran Air 3/4" Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Km / WC A - 1.00 - -
Km / WC B - 1.00 - -
Rg Cuci - 1.00 - -
Dapur - 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Km / WC B - 1.00 - -
Jumlah B

Total Jumlah (A+B) =


4 Pas Pipa Air Bersih Type PVC AW 3/4" Panjang Jumlah Lebar m'
Bangunan 1 (Lantai 1) Instalasi
Km / WC A 15.00 1.00 - -
Km / WC B 12.00 1.00 - -
Rg Cuci 15.00 1.00 - -
Dapur 12.00 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Km / WC B 16.00 1.00 - -
Jumlah B

Total Jumlah (A+B) =

5 Pas Pipa Air Kotor Type PVC AW 1/2" Panjang Jumlah Lebar m'
Bangunan 1 (Lantai 1) Instalasi
Km / WC A 3.00 1.00 - -
Km / WC B 3.00 1.00 - -
Rg Cuci 3.00 1.00 - -
Dapur 5.00 1.00 - -
Jumlah A
Bangunan 1 (Lantai 2)
Km / WC B 6.00 1.00 - -
Jumlah B

Total Jumlah (A+B) =

6 Pek. Septictank Panjang Jumlah Lebar m'


Bangunan 1 (Lantai 1) Instalasi
Km / WC A - - -
1.00
Km / WC B - - -
Bangunan 1 (Lantai 1)
Km / WC B 6.00 1.00 - -
Jumlah A
-
BU ELSA )
-
-

Volume
165.00
165.00 m2 3.00

Volume
52.00 ### ok Benar
52.00 m' #VALUE!
-

Volume
37.95 0.00
29.30
67.25 m3
0.00
16.81 m3

Volume
4.74 0.00 ok Benar
1.58
6.33 m3

Volume 3.00 ok Benar


9.49 0.00 ok Benar
9.49 m3
0
Volume 0
15.65 5.00 ok Benar
2.10
17.76 m3

Volume
3.16 #REF! ok Benar
3.16 m3
-
Volume -
12.32 #VALUE!
-
12.32 m3
1.42
1.42 m3

Volume
1.90
1.90 m3

Volume
1.49
4.75
6.24 m3

Volume
4.20
2.54
0.62
7.36 m3

Volume
1.69

4.61
0.03
0.12
4.76 m3

Volume
4.09
3.57
1.25
8.90 m3

Volume
1.04
0.18
0.41
0.43
0.15
2.21 m3

Volume
1.20
1.20 m3
Volume -

78.44 -
2.66
2.80
89.18
5.81
9.62
188.50

Volume

95.41
98.04
193.45
381.94 m2

Volume

5.70
0.75
3.23
2.39
20.00
3.55
0.72
0.93
2.76
5.04
13.23
58.29 m2

323.65 m2 #VALUE!

Volume -
647.31 m2 #VALUE!

Volume

0.80
0.15
0.80
0.25
0.65
0.40
0.23
0.18
0.55
1.97
5.97 m3

5.97 m3

Volume

2.40
0.45
2.40
0.75
1.95
1.20
0.68
0.53
1.65
5.92
17.92 m3

17.92 m3 #REF!

Volume

1.60
0.15
1.60
0.50
1.30
0.80
0.45
0.18
1.10
1.97
9.65 m3

9.65 m3
Volume

16.00
16.00
5.00
13.00
8.00
4.50
11.00
39.46
73.50 m2

16.00
16.00
5.00
5.00
13.00
11.00
10.00
2.50
78.50 m2

152.00 m2

Volume

3.00
12.60

3.50
13.50

3.00
12.60

5.46
5.20
3.90
62.76 m2

4.32
1.47
0.84
6.63 m2

56.13 m2

Volume
0.62
0.16
0.29
1.08 m3

Volume

0.60
0.29
0.23
0.12

1.24 m3

Volume

0.08
0.07
0.24
0.04
0.44 m3

0.29
0.14
0.11
0.06
0.60 m3

1.03 m3

Volume

31.91
33.56
16.49
32.97
14.86
14.42
18.24
15.85
178.29 m2

178.29 m2

Volume
29.37
29.37 m'

Volume
59.64
59.64 m'

Volume

16.00
16.00
5.00
13.00
8.00
4.50
11.00
39.46
112.96 m2

16.00
16.00
5.00
5.00
13.00
11.00
10.00
2.50
78.50 m2

191.46 m2

Volume -
-

3.00
3.50

3.00

11.00

20.50 m2
211.96 m2

Volume

647.31 m2

Volume

0.92
4.44
1.51
0.60
0.43
1.16
1.50
3.06
13.62 m2

Volume

3.11
12.96
8.76
1.08
0.92
2.64
2.94
8.40
40.81 m2

25.65
25.65 m2
66.46 m2

Volume

3.28
19.68
22.96 m2

Luas Volume
Bid. Kaca

1.38 2.82
0.39 1.01
0.22 0.58
8.29 16.91
2.33 6.07
0.58 1.52
0.39 1.01
1.17 3.03
1.34 3.46
Jumlah B 36.40 m2

Total Jumlah A+B = 59.36 m2

Volume

0.07
0.29
0.26
0.02
0.02
0.06
0.07
0.19
0.98

0.00
0.01
0.01
0.01
0.00
0.00
0.00
0.01
0.04

1.02 m3

Volume

1.48
8.86
10.33 m2

Volume

3.87
3.87 m2

Volume
Daun Jendala
2.10
0.70
0.40
12.60
4.20
1.05
0.70
2.10
2.40
26.25 m2

Volume
Daun Jendala
2.48
2.48 m2

Volume

-
1.00
3.00
6.00
10.00 BH
Volume

-
3.00
9.00
18.00
30.00 BH

Volume
Daun Jendela
4.00
4.00
2.00
24.00
24.00
6.00
4.00
12.00
12.00
92.00 BH

Volume

-
3.00
-
3.00 BH

Volume
Daun Jendela
2.00
2.00
1.00
12.00
12.00
3.00
2.00
6.00
6.00
46.00 BH

49.00 BH

Volume
Daun Jendela
2.00
2.00
1.00
12.00
12.00
3.00
2.00
6.00
6.00
46.00 BH

Volume

1.00
3.00
6.00
10.00 BH

Volume
Daun Jendela
2.00
2.00
1.00
12.00
12.00
3.00
2.00
6.00
6.00
46.00 BH

56.00 BH

Volume

2.00
1.00
2.00
1.00
1.00
2.00
1.00
2.00
12.00 Titik

1.00
1.00
1.00
2.00
1.00
2.00
8.00 Titik

20.00 Titik

Volume

1.00
2.00
1.00
1.00
5.00 BH

1.00
1.00
1.00
2.00
1.00
2.00
8.00 BH

13.00 BH

Volume

1.00
1.00
1.00
1.00
4.00 BH

1.00
1.00
2.00 BH

6.00 BH

Volume
2.00
2.00
1.00
2.00
1.00
8.00 Bh

1.00
1.00
1.00
2.00
1.00
6.00 BH

14.00 BH

Volume

2.00
2.00
1.00
2.00
2.00
9.00 BH

1.00
1.00
1.00
2.00
5.00 Bh

14.00 Bh

Volume

1.00
1.00
2.00
4.00 BH

1.00
3.00
4.00 Bh
8.00 Bh

Volume
1.00
1.00
2.00 BH

Volume

1.00
1.00
2.00 Bh

1.00
1.00 Bh

3.00 BH

Volume

1.00
1.00
1.00
3.00 BH

1.00
1.00 BH

4.00 BH

Volume

1.00
1.00
1.00
1.00
4.00 BH

1.00
1.00 BH

5.00 BH
Volume

15.00
12.00
15.00
12.00
54.00 m'

16.00
16.00 m'

70.00 m'

Volume

3.00
3.00
3.00
5.00
14.00 m'

6.00
6.00 m'

20.00 m'

Volume

1.00
-

1.00
2.00 Unit