I PRELIMINARY 1 LOT
NOTE :
EXCLUDED :
- PPN 10%
- The cost of work -related civil works
- Employment costs for KITCHEN works
TOTAL HARGA KETERANGAN
(Rp)
TOTAL HARGA KETERANGAN
(Rp)
-
REKAPITULASI
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
A. PERALATAN UTAMA
PEKERJAAN PLUMBING
e. Deep Well , Kedalaman s/d 200 meter, lengkap dengan pompa set 2
submersible pump, kap. 200 lpm, 8KW/380V/3ph/50HZ
Kap : 150 s/d 200 lpm
Head : 200 mka
Speed : 1450 rpm
PI : 7.5 kw/ 380 V/ 50Hz/3ph
Type : Submersible Pump c/w Panel Kontrol
k Acessories Pompa
Gate Valve dia. 100 mm 10 K unit 6
Gate Valve dia. 80 mm 10 K unit 40
Gate Valve dia. 65 mm 10 K unit 9
Gate Valve dia. 50 mm 10 K unit 6
Gate Valve dia. 40 mm 10 K unit 1
Strainer dia. 80 mm 10 K unit 22
Strainer dia. 65 mm 10 K unit 6
Strainer dia. 50 mm 10 K unit 6
Flexible Joint dia. 80 mm 10 K unit 20
Flexible Joint dia. 65 mm 10 K unit 4
Flexible Joint dia. 50 mm 10 K unit 6
Check Valve dia. 80 mm 10 K unit 20
Check Valve dia. 65 mm 10 K unit 4
Check Valve dia. 50 mm 10 K unit 6
Floating Valve dia. 80 mm 10 K unit 4
Floating Valve dia. 65 mm 10 K unit 2
Floating Valve dia. 50 mm 10 K unit
Pressure Gauge unit 6
Foot Valve unit 6
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
2. LANTAI - Basement
Pemipaan PP-R PN10 (Incl. Fitting & All Accessories)
dia. 65mm (dari GWT ke Roof Tank ) m 170
dia. 50 mm m 53
dia. 80mm (dari Tanki atas ke lantai - lantai ) m 72
dia. 25mm (supply area kran taman area site plan) m 675
dia. 15mm m 180
Fitting-fitting lot 1
Air Panas
Pemipaan PP-R PN20 (Incl. Fitting & All Accessories)
dia. 40 mm (Riser) m 110
dia. 25 mm m 38
dia. 20mm m 184
dia. 15 mm m 248
Fitting-fitting lot 1
GV, 25 mm unit 9
3. LANTAI - Dasar
Pemipaan PP-R PN10 (Incl. Fitting & All Accessories)
dia. 80 mm m 110
dia. 50 mm (Riser) m 53
dia. 25 mm m 88
dia. 20mm m 30
dia. 15 mm m 120
Fitting-fitting lot 1
GV, 25 mm unit 16
Air Panas
Pemipaan PP-R PN20 (Incl. Fitting & All Accessories)
dia. 40 mm (Riser) m 110
dia. 25 mm m 38
dia. 20mm m 184
dia. 15 mm m 248
Fitting-fitting lot 1
GV, 25 mm unit 16
4. LANTAI - 1
Pemipaan PP-R PN10 (Incl. Fitting & All Accessories)
dia. 50 mm (Riser) m 145
dia. 25 mm m 241
dia. 20mm m 118
dia. 15 mm m 504
Fitting-fitting lot 1
GV, 25 mm unit 41
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
Air Panas
Pemipaan PP-R PN20 (Incl. Fitting & All Accessories)
dia. 40 mm (Riser) m 145
dia. 25 mm m 50
dia. 20mm m 241
dia. 15 mm m 326
Fitting-fitting lot 1
GV, 25 mm unit 41
5. LANTAI - 2
Pemipaan PP-R PN10 (Incl. Fitting & All Accessories)
dia. 50 mm (Riser) m 98
dia. 25 mm m 165
dia. 20mm m 80
dia. 15 mm m 330
Fitting-fitting lot 1
GV, 25 mm unit 41
Air Panas
Pemipaan PP-R PN20 (Incl. Fitting & All Accessories)
dia. 40 mm (Riser) m 97
dia. 25 mm m 34
dia. 20mm m 161
dia. 15 mm m 218
Fitting-fitting lot 1
GV, 25 mm unit 41
6. LANTAI - 3
Pemipaan PP-R PN10 (Incl. Fitting & All Accessories)
dia. 50 mm (Riser) m 98
dia. 25 mm m 165
dia. 20mm m 80
dia. 15 mm m 330
Fitting-fitting lot 1
GV, 25 mm unit 41
Air Panas
Pemipaan PP-R PN20 (Incl. Fitting & All Accessories)
dia. 40 mm (Riser) m 97
dia. 25 mm m 34
dia. 20mm m 161
dia. 15 mm m 218
Fitting-fitting lot 1
GV, 25 mm unit 41
7. LANTAI - 4
Air Bersih
Pemipaan PP-R PN10 (Incl. Fitting & All Accessories)
dia. 50 mm (Riser) m 98
dia. 25 mm m 165
dia. 20mm m 80
dia. 15 mm m 330
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
Fitting-fitting lot 1
GV, 25 mm unit 41
Air Panas
Pemipaan PP-R PN20 (Incl. Fitting & All Accessories)
dia. 40 mm (Riser) m 97
dia. 25 mm m 34
dia. 20mm m 161
dia. 15 mm m 218
Fitting-fitting lot 1
GV, 25 mm unit 41
8. LANTAI - ATAP
Roof Tank : Kap. = 14 m3 unit 2
dengan dinding pemisah
Booster Pump Packaged , Air Bersih (2 unit) set 2
Kap : 19m3/jam
Head : 15 mka
Speed : 2950 rpm
PI : 3,5 kw/ 390 V/ 50Hz/3ph
Type : centrifugal end suction (parallel Alternate)
Air Bersih
Pemipaan PP-R PN10 (Incl. Fitting & All Accessories)
dia. 80 mm m 23
dia. 50 mm m 18
Fitting-fitting lot 1
Air Panas
Heat Pump, Kap. 38.000 KCAL/HR , 5 BAR unit 1
Hot Water Tank kap. 2,5 m3 , 5 BAR unit 1
2. LANTAI - Dasar
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 158
dia. 100 m 207
dia. 65 m 56
dia. 50 m 347
Fitting-fitting lot 1
Clean Out dia 80 unit 16
Floor Drain dia 50 unit 64
3. LANTAI - 1
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 188
dia. 100 m 246
dia. 65 m 66
dia. 50 m 413
Fitting-fitting lot 1
Clean Out dia 80 unit 41
Floor Drain dia 50 unit 164
4. LANTAI - 2
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 218
dia. 100 m 285
dia. 65 m 77
dia. 50 m 479
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
Fitting-fitting lot 1
Clean Out dia 80 unit 41
Floor Drain dia 50 unit 164
5. LANTAI - 3
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 218
dia. 100 m 285
dia. 65 m 77
dia. 50 m 479
Fitting-fitting lot 1
Clean Out dia 80 unit 41
Floor Drain dia 50 unit 164
6. LANTAI - 4
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 218
dia. 100 m 285
dia. 65 m 77
dia. 50 m 479
Fitting-fitting lot 1
Clean Out dia 80 unit 41
Floor Drain dia 50 unit 164
LANTAI - Dasar
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 200 m 14
dia. 80 m 117
dia. 200 ( Pipa riser ) m 69
dia. 100 ( Pipa riser ) m 158
dia. 100 m 83
dia. 80 (Vent) m 165
dia. 32 (Vent) m 528
Fitting-fitting lot 1
Clean Out dia 100 unit 16
2. LANTAI - 1
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 207
dia. 100 m 108
dia. 80 (Vent) m 216
dia. 32 (Vent) m 693
Fitting-fitting lot 1
Clean Out dia 100 unit 41
3. LANTAI - 2
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 246
dia. 100 m 128
dia. 80 (Vent) m 257
dia. 32 (Vent) m 825
Fitting-fitting lot 1
Clean Out dia 100 unit 41
4. LANTAI - 3
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 285
dia. 100 m 149
dia. 80 (Vent) m 297
dia. 32 (Vent) m 957
Fitting-fitting lot 1
Clean Out dia 100 unit 41
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
5. LANTAI - 4
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 ( Pipa riser ) m 285
dia. 100 m 149
dia. 80 (Vent) m 297
dia. 32 (Vent) m 957
Fitting-fitting lot 1
Clean Out dia 100 unit 41
9. LANTAI - Atap
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 80 (Vent) m 297
Fitting-fitting lot 1
Vent Cup dia. 80 bh 29
1. LANTAI - Basement
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 150 ( Pipa riser ) m 83
dia. 100 ( Pipa riser ) m
Fitting-fitting lot 1
Resapan lot 1
2. LANTAI - Dsr
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 200 m 165
dia. 150 m 283
dia. 100 ( Pipa riser ) m 167
Fitting-fitting lot 1
3. LANTAI - 1
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
support dan Perlengkapannya.
dia. 100 ( Pipa riser ) m 147
Fitting-fitting lot 1
4. LANTAI - 2
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
support dan Perlengkapannya.
dia. 100 ( Pipa riser ) m 147
Fitting-fitting lot 1
5. LANTAI - 3
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
support dan Perlengkapannya.
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
6. LANTAI - 4
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
support dan Perlengkapannya.
dia. 100 ( Pipa riser ) m 147
Fitting-fitting lot 1
7. LANTAI - 5
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
support dan Perlengkapannya.
dia. 100 ( Pipa riser ) m 147
Fitting-fitting lot 1
8 LANTAI ATAP
Pemipaan PVC Class AW (Incl. Fitting & All Accessories)
dia. 100 m 86
Fitting-fitting lot 1
Roof Drain dia. 100 unit 17
A Main Equipment
1 Electric Hydrant Pump
Type : Horizontal Centrifugal Split Casing unit 1
Capacity : 170 m3/jam
Total Head : 92 M
Daya : 85KW, 380V 3Ø , 50Hz, 2950 rpm
included with Panel Control Automatic NFPA 20 Standard
Lengkap kabel dari panel ke motor pompa
3 Jockey Pump
Type : Vertical Multistage stainless steel in line pump unit 1
Capacity : 8.5m3/jam
Total Head : 110 M
Motor : 5 Kw/ 2950 Rpm / 380 Volt / 50 Hz / 3 Ph
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
4 Pemipaan di R. Pompa
Fitting-fitting lot 1
5 Header Pipe Dia. 250 mm c/w Fitting-fitting dan material bantu set 2
6 Valve-valve
Gate Valve Dia. 150 mm 16 K unit 7
Gate Valve Dia. 50 mm 16 K unit 2
Check Valve Dia. 150 mm 16 K unit 2
Check Valve Dia. 50 mm 16 K unit 1
Strainer Dia. 150 mm 16 K unit 2
Strainer Dia. 50 mm 16 K unit 1
Flexible Joint Dia. 150 mm 16 K unit 4
Flexible Joint Dia. 50 mm 16 K unit 2
Safety Valve Dia.100mm 16 K unit 1
Pressure Gauge unit 4
Pressure switch unit 3
Pressure Reducing Valve (PRV) dia. 150mm unit 1
Main Control Valve (MCV) dia. 150mm unit 1
B INSTALASI
1. Site Plan
Pekerjaan Hydrant
Penyediaan dan Pemasangan OHB ( Outdoor Hydrant Box ) lengkap dengan unit 4
peralatan penunjang
Hydrant pillar unit 4
Two way Siammesse Connection c/w valve unit 2
2. LANTAI - Basement
Pekerjaan Pipa Hydrant
Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan unit 3
peralatan penunjang
Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm m 18
Pipa Tegak :
Penyediaan dan Pemasangan Pipa Sch 40 Dia 150 mm m 15
Fitting-fitting lot 1
Fitting-fitting lot 1
Sprinkler Head Pendant type dia 25mm bh 194
Fitting-fitting lot 1
Gate Valve 25 mm bh 3
Orrifice Plate 25 mm bh 3
Branch Control Valve dia. 80 mm bh 1
3. LANTAI - Dasar
Pekerjaan Pipa Hydrant
Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan unit 2
peralatan penunjang
Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm m 18
Penyediaan dan Pemasangan Pipa Sch 40 Dia 80 mm m 203
Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm m 83
Pipa Tegak :
Penyediaan dan Pemasangan Pipa Sch 40 Dia 150 mm m 23
Fitting-fitting lot 1
Fitting-fitting lot 1
Sprinkler Head Pendant type ,dia 25mm bh 129
Fitting-fitting lot 1
Gate Valve 25 mm bh 3
Orrifice Plate 25 mm bh 3
Branch Control Valve dia. 80 mm bh 1
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
4. LANTAI - 1
Pekerjaan Hydrant
Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan unit 2
peralatan penunjang
Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm m 18
Penyediaan dan Pemasangan Pipa Sch 40 Dia 80 mm m 203
Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm m 83
Pipa Tegak :
Penyediaan dan Pemasangan Pipa Sch 40 Dia 150 mm m 23
Fitting-fitting lot 1
Fitting-fitting lot 1
Gate Valve 25 mm bh 3
Orrifice Plate 25 mm bh 3
Branch Control Valve dia. 80 mm bh 1
5. LANTAI - 2
Pekerjaan Hydrant
Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan unit 2
peralatan penunjang
Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm m 12
Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm m 23
Pipa Tegak :
Penyediaan dan Pemasangan Pipa Sch 40 Dia 150 mm m 9
Fitting-fitting lot 1
Fitting-fitting lot 1
Gate Valve 25 mm bh 3
Orrifice Plate 25 mm bh 3
Branch Control Valve dia. 80 mm bh 1
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
6. LANTAI - 3
Pekerjaan Hydrant
Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan unit 2
peralatan penunjang
Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm m 12
Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm m 23
Pipa Tegak :
Penyediaan dan Pemasangan Pipa Sch 40 Dia 150 mm m 9
Fitting-fitting lot 1
Fitting-fitting lot 1
Gate Valve 25 mm bh 3
Orrifice Plate 25 mm bh 3
Branch Control Valve dia. 80 mm bh 1
7. LANTAI - 4
Pekerjaan Hydrant
Penyediaan dan Pemasangan IHB ( Indoor Hydrant Box ) lengkap dengan unit 2
peralatan penunjang
Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm m 12
Penyediaan dan Pemasangan Pipa Sch 40 Dia 100 mm m 23
Pipa Tegak :
Penyediaan dan Pemasangan Pipa Sch 40 Dia 150 mm m 9
Fitting-fitting lot 1
Fitting-fitting lot 1
Gate Valve 25 mm bh 3
Orrifice Plate 25 mm bh 3
Branch Control Valve dia. 80 mm bh 1
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
8. LANTAI ATAP
Pekerjaan Hydrant
Penyediaan dan Pemasangan OHB ( Outdoor Hydrant Box ) lengkap dengan unit 1
peralatan penunjang
Penyediaan dan Pemasangan Pipa Sch 40 Dia 65 mm m 12
Fitting-fitting lot 1
TOTAL INSTALASI
1. LANTAI - Basement
AC Split Duct : Cap : 30,000 BTUH unit 1
Cap : 45,300 BTUH unit 8
Material Pendukung ls 1
2. LANTAI - Dasar
Indoor Unit (FCU) : Cap : 12,600 BTUH unit 16
Cap : 10,200 BTUH unit 1
Cap : 30,500 BTUH unit 2
Material Pendukung ls 1
3. LANTAI - 1
Indoor Unit (FCU) : Cap : 13,200 BTUH unit 41
Cap : 18,000 BTUH unit 1
Cap : 30,500 BTUH unit 2
Material Pendukung ls 1
BILL OF QUANTITY
PEKERJAAN MEKANIKAL
PROYEK : VEASNA BEACH FRONT SUITES
4. LANTAI - 2
Indoor Unit (FCU) : Cap : 13,200 BTUH unit 41
Cap : 18,000 BTUH unit 1
Cap : 30,500 BTUH unit 2
Material Pendukung ls 1
5. LANTAI - 3
Indoor Unit (FCU) : Cap : 13,200 BTUH unit 41
Cap : 18,000 BTUH unit 1
Cap : 30,500 BTUH unit 2
Material Pendukung ls 1
6. LANTAI - 4
Indoor Unit (FCU) : Cap : 13,200 BTUH unit 41
Cap : 18,000 BTUH unit 1
Cap : 30,500 BTUH unit 2
Ducting untuk AC : ls 1
SAD 1000 x 150 ttk 41
Material Pendukung ls 1
7. LANTAI - 5
Indoor Unit (FCU) : Cap : 28,900 BTUH unit 4
Cap : 54,300 BTUH unit 5
Cap : 40,900 BTUH unit 2
Cap : 13,200 BTUH unit 3
Cap : 52,500 BTUH unit 1
Cap : 57,000 BTUH unit 5
Cap : 18,000 BTUH unit 1
Cap : 60,400 BTUH unit 3
Material Pendukung ls 1
3,412,700
2,244,800
2,120,100
1,171,000
762,300
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
523,200
496,700
232,900
17,300
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
HARGA SATUAN JUMLAH HARGA
(Rp) (Rp)
REKAPITULASI
PEKERJAAN MEKANIKAL & ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
A PEKERJAAN PANEL
B KABEL FEEDER
C KABEL TRAY
A. INSTALASI TELEPON
E. INSTALASI MATV
F. INSTALASI CCTV
G. KABEL TRAY
A. PEKERJAAN PANEL
7 DARI LVMDP ke :
PP - Basement NYY 4 x 10mm2 + BC 6 mm2 m 10
PP - L Dsr NYY 4 x 16 mm2 + BC 10 mm2 m 17
PP - L1 NYY 4 x 35 mm2 + BC 25 mm2 m 30
PP - L2 NYY 4 x 35 mm2 + BC 25 mm2 m 35
PP - L3 NYY 4 x 35 mm2 + BC 25 mm2 m 40
PP - L4 NYY 4 x 35 mm2 + BC 25 mm2 m 45
PP - L5 NYY 4 x 35 mm2 + BC 25 mm2 m 50
PP - L Atap NYY 4 x 120mm2 + BC 95mm2 m 92
PP - AC - Atap NYY 4 x 120mm2 + BC 95mm2 m 92
PP - Pool NYY 4 x 10mm2 + BC 6 mm2 m 18
PP - Kitchen NYY 4 x 50 mm2 + BC3 mm2 m 50
PP - Hydrant FRC 4 x 120mm2 + BC 95mm2 m 64
SDP - Pompa NYY 2 (4 x150mm2 )+ BC 95mm2 m 120
PP - LIFT FRC 4 x 50mm2 + BC 35mm2 m 105
PP - AC GF NYY 4 x 16 mm2 + BC 10 mm2 m 17
PP - Sistem Air Panas NYY 4 x 35 mm2 + BC 25 mm2 m 105
8 DARI PP - Pompa ke :
P Kontrol STP-A NYY 4 x 4 mm2 + BC 4 mm2 m 74
P Kontrol STP-B NYY 4 x 4 mm2 + BC 4 mm2 m 96
P Kontrol Pompa Solar NYY 4 x 4 mm2 + BC 4 mm2 m 62
P Kontrol Grease Trap NYY 4 x 4 mm2 + BC 4 mm2 m 20
P Kontrol SP-1 NYY 4 x 4 mm2 + BC 4 mm2 m 63
P Kontrol SP-2 NYY 4 x 4 mm2 + BC 4 mm2 m 33
P Kontrol SP-3 NYY 4 x 4 mm2 + BC 4 mm2 m 69
P Kontrol SP-4 NYY 4 x 4 mm2 + BC 4 mm2 m 20
P Kontrol SP-5 NYY 4 x 4 mm2 + BC 4 mm2 m 41
P Kontrol SP-6 NYY 4 x 4 mm2 + BC 4 mm2 m 55
P Kontrol SP-7 NYY 4 x 4 mm2 + BC 4 mm2 m 68
P Kontrol SP-8 NYY 4 x 4 mm2 + BC 4 mm2 m 73
P Kontrol Pompa Transfer - AB NYY 4 x 10mm2 + BC 6 mm2 m 45
P Kontrol Pompa Transfer - RC NYY 4 x 10mm2 + BC 6 mm2 m 45
P Kontrol P. WTP NYY 4 x 10mm2 + BC 6 mm2 m 55
P Kontrol P. GP NYY 4 x 10mm2 + BC 6 mm2 m 40
P Kontrol EF & FAF NYY 4 x 10mm2 + BC 6 mm2 m 35
9 DARI PP - Atap ke :
P Kontrol Pompa Booster - AB NYY 4 x 10 mm2 + BC 6 mm2 m 20
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
11 DARI PP - L 1 ke :
FCU Corr - 1 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 45
FCU Corr - 2 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 30
FCU - Lobby Lift NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 13
12 DARI PP - L 2 ke :
FCU Corr - 1 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 45
FCU Corr - 2 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 30
FCU - Lobby Lift NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 13
13 DARI PP - L 3 ke :
FCU Corr - 1 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 45
FCU Corr - 2 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 30
FCU - Lobby Lift NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 13
14 DARI PP - L 4 ke :
FCU Corr - 1 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 45
FCU Corr - 2 NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 30
FCU - Lobby Lift NYY 3 x 2.5 mm2 + NYA 2.5 mm2 m 13
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
16 DARI PP - Hydrant ke :
PC - Pompa Hydrant NYY 4 x 95mm2 + BC 70mm2 m 25
PC - Pompa Jockey NYY 4 x 4 mm2 + BC 4 mm2 m 28
17 DARI PC - SP- 1 ke :
Pompa SummPit - 1.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 1.2 NYYHY 4 x 4 mm2 m 6
18 DARI PC - SP- 2 ke :
Pompa SummPit - 2.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 2.2 NYYHY 4 x 4 mm2 m 6
19 DARI PC - SP- 3 ke :
Pompa SummPit - 3.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 3.2 NYYHY 4 x 4 mm2 m 6
20 DARI PC - SP- 4 ke :
Pompa SummPit - 4.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 4.2 NYYHY 4 x 4 mm2 m 6
21 DARI PC - SP- 5 ke :
Pompa SummPit - 5.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 5.2 NYYHY 4 x 4 mm2 m 6
22 DARI PC - SP- 6 ke :
Pompa SummPit - 6.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 6.2 NYYHY 4 x 4 mm2 m 6
23 DARI PC - SP- 7 ke :
Pompa SummPit - 7.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 7.2 NYYHY 4 x 4 mm2 m 6
24 DARI PC - SP- 8 ke :
Pompa SummPit - 8.1 NYYHY 4 x 4 mm2 m 6
Pompa SummPit - 8.2 NYYHY 4 x 4 mm2 m 6
25 DARI PC - PF - 1 ke :
PF FRC 4 x 2.5 mm2 m 3
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
26 DARI PC - PF - 2 ke :
PF FRC 4 x 2.5 mm2 m 3
C. KABEL TRAY
1 Lantai - Basement
- Tray W 500 x 100 m' 42
- Tray W 400 x 100 m' 80
- Tray W 300 x 100 m' 190
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
2 Lantai -DASAR
- Tray W 400 x 100 m' 60
- Tray W 300 x 100 m' 113
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
3 Lantai -1
- Tray W 400 x 100 m' 60
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
4 Lantai -2
- Tray W 300 x 100 m' 80
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
5 Lantai -3
- Tray W 300 x 100 m' 80
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
6 Lantai -4
- Tray W 300 x 100 m' 80
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
7 Lantai -5
- Tray W 300 x 100 m' 35
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
9 Painting lot 1
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
2 Lantai - DASAR
- Down Light LED, 13 W bh 223
- Down Light LED, 13 W w/Batt bh 23
- Down Light LED, 30 W , spot bh 12
- TL 1 x 36W , Balk bh 34
- TL 1 x 36W , Balk ,w/ Batt bh 5
- TL 2 x 36W , Balk bh 12
- TL 2 x 36W , Balk ,w/ Batt bh 2
- TL 2 x 36W , RM, M5 bh 12
- TL 2 x 36W , RM, M5, w/Batt bh 3
- TL 2 x 36W , TKO Cover Acrilyc (Lp tangga) bh 9
- TL 1 x 36W , GMS bh 3
- TL Wall Lamp , Halogen 50W, 12V bh 3
- Exit Lamp 8Watt bh 5
- Saklar 1 gang bh 17
- Saklar 2 gang bh 31
- Stop Kontak 1p 16A bh 40
ROOM :
Type STANDARD (16 unit)
- Down Light PL 1 x 7W bh 80
- Lampu Wastafel TL , T5, 1 x 14W GMS bh 16
- Lampu Meja, Bulb 40W bh 32
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
- Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 128
- Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 48
- Instalasi KeyCard ttk 16
- Instalasi KeySwitch ttk 16
3 Lantai - 1
- Down Light LED, 13 W bh 202
- Down Light LED, 13 W w/Batt bh 20
- TL 1 x 36W , Balk bh 11
- TL 2 x 36W , Balk bh 3
- TL 2 x 36W , Dust Proof bh 9
- TL 2 x 36W , Dust Proof w/Batt bh 2
- TL 2 x 36W , TKO Cover Acrilyc (Lp tangga) bh 8
- TL 1 x 36W , GMS bh 3
- TL Wall Lamp , Halogen 50W, 12V bh 3
- Exit Lamp 8Watt bh 6
- Saklar 1 gang bh 19
- Saklar 2 gang bh 23
- Stop Kontak 1p 16A bh 48
ROOM :
Type STANDARD (41 unit)
- Down Light PL 1 x 7W bh 205
- Lampu Wastafel TL , T5, 1 x 14W GMS bh 41
- Lampu Meja, Bulb 40W bh 82
- Stop Kontak 1ph, 100W bh 123
- KeyCard bh 41
- KeySwitch bh 41
- Saklar Seri bh 82
- Saklar Enkel bh 41
- Micro Switch bh 41
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
- Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 328
- Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 123
- Instalasi KeyCard ttk 41
- Instalasi KeySwitch ttk 41
4 Lantai - 2
- Down Light LED, 13 W bh 22
- Down Light LED, 13 W w/Batt bh 6
- TL 1 x 36W , Balk bh 8
- TL 2 x 36W , TKO Cover Acrilyc (Lp tangga) bh 6
- TL Wall Lamp , Halogen 50W, 12V bh 3
- Saklar 1 gang bh 3
- Saklar 2 gang bh 3
- Stop Kontak 1p 16A bh 12
ROOM :
Type STANDARD (41 unit)
- Down Light PL 1 x 7W bh 205
- Lampu Wastafel TL , T5, 1 x 14W GMS bh 41
- Lampu Meja, Bulb 40W bh 82
- Stop Kontak 1ph, 100W bh 123
- KeyCard bh 41
- KeySwitch bh 41
- Saklar Seri bh 82
- Saklar Enkel bh 41
- Micro Switch bh 41
- Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 328
- Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 123
- Instalasi KeyCard ttk 41
- Instalasi KeySwitch ttk 41
5 Lantai - 3
- Down Light LED, 13 W bh 22
- Down Light LED, 13 W w/Batt bh 6
- TL 1 x 36W , Balk bh 8
- TL 2 x 36W , TKO Cover Acrilyc (Lp tangga) bh 6
- TL Wall Lamp , Halogen 50W, 12V bh 3
- Saklar 1 gang bh 3
BILL OF QUANTITY
PEKERJAAN ELEKTRIKAL
PROYEK : VEASNA BEACH FRONT SUITES
- Saklar 2 gang bh 3
- Stop Kontak 1p 16A bh 12
ROOM :
Type STANDARD (41 unit)
- Down Light PL 1 x 7W bh 205
- Lampu Wastafel TL , T5, 1 x 14W GMS bh 41
- Lampu Meja, Bulb 40W bh 82
- Stop Kontak 1ph, 100W bh 123
- KeyCard bh 41
- KeySwitch bh 41
- Saklar Seri bh 82
- Saklar Enkel bh 41
- Micro Switch bh 41
- Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 328
- Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 123
- Instalasi KeyCard ttk 41
- Instalasi KeySwitch ttk 41
6 Lantai - 4
- Down Light LED, 13 W bh 22
- Down Light LED, 13 W w/Batt bh 6
- TL 1 x 36W , Balk bh 8
- TL 2 x 36W , TKO Cover Acrilyc (Lp tangga) bh 6
- TL Wall Lamp , Halogen 50W, 12V bh 3
- Saklar 1 gang bh 3
- Saklar 2 gang bh 3
- Stop Kontak 1p 16A bh 12
ROOM :
Type STANDARD (41 unit)
- Down Light PL 1 x 7W bh 205
- Lampu Wastafel TL , T5, 1 x 14W GMS bh 41
- Lampu Meja, Bulb 40W bh 82
- Stop Kontak 1ph, 100W bh 123
- KeyCard bh 41
- KeySwitch bh 41
- Saklar Seri bh 82
- Saklar Enkel bh 41
- Micro Switch bh 41
- Instalasi penerangan NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 328
- Instalasi Stop Kontak NYM 3 x 2.5 mm2 dlm conduit dia.20mm ttk 123
- Instalasi KeyCard ttk 41
- Instalasi KeySwitch ttk 41
7 Lantai - 5
- Down Light LED, 13 W bh 22
- Down Light LED, 13 W w/Batt bh 6
- TL 1 x 36W , Balk bh 8
- TL 2 x 36W , TKO Cover Acrilyc (Lp tangga) bh 6
- TL Wall Lamp , Halogen 50W, 12V bh 3
- Saklar 1 gang bh 3
- Saklar 2 gang bh 3
- Stop Kontak 1p 16A bh 12
G. PEKERJAAN GENSET
1 Genset kapasitas 750 kVA, 3Ø, 50Hz, 415V, 1500 rpm, unit 2
c/w Radiator & accessories
a. Residential Silencer unit 2
b. Exhaust Sound Attenuator 1500mm x 2000mm x 2000mm unit 1
c. Exhaust Louvre size 3200 x 2200mm incl. kwt burung unit 1
d. Intake Sound Attenuator 1500mm x 1500mm x 4000mm unit 1
c. Intake Louvre size 1500 x 4000mm incl. kwt burung unit 1
2 Spring Vibration dudukan gen-set set 2
3 Vibration Isolator gantungan silencer set 2
4 Tanki BBM harian kapasitas 1.000 ltr unit 1
5 Tanki BBM mingguan kapasitas 15.000 ltr Dmild steel, T,plat 6mm unit 1
6 Pompa BBM listrik merk chosin 25 l/m unit 1
7 Pompa BBM tangan (manual) unit 1
8 Pemipaan BBM lengkap dgn gate valve unit 1
9 Instalasi bahan bakar lot 1
10 Inst. Pp cerobong asap genset ke sound pit s/d cerobong asap. lot 1
11 Sound Proof ruang gen - set, Rock Wool 100 Kg/m³ lot 1
12 Exhaust Fan cap. 3.000 CFM unit 2
13 Panel Kontrol Genset (PKG) unit 1
14 Material bantu lot 1
15 Testing Commissioning lot 1
1. Peralatan Utama
- PABX 30/300 expandable c/w Battery & Charger, Rectifier unit 1
- Operator Console unit 1
- Hanset Digital Non Display unit 1
- Biaya pemasangan Equipment PABX & termasuk programming lot 1
- Relay ke sistim sound sysytem lot 1
- MDF 800 pairs lot 1
2 Lantai - Dasar
- Instalasi Telepon di dinding dengan Cable ttk 16
ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2
- Telepon Outlet, bh 16
- TB-Tel- Das (Terminal box 20 pairs) unit 1
3 Lantai - 1
- Instalasi Telepon di dinding dengan Cable ttk 41
ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2
- Telepon Outlet, bh 41
- TB-Tel- Lt 1 (Terminal box 20 pairs) unit 1
4 Lantai - 2
- Instalasi Telepon di dinding dengan Cable ttk 41
ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2
- Telepon Outlet, bh 41
- TB-Tel- Lt 2 (Terminal box 40 pairs) unit 1
5 Lantai - 3
- Instalasi Telepon di dinding dengan Cable ttk 41
ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2
- Telepon Outlet, bh 41
- TB-Tel - lt.3 (Terminal box 40 pairs) unit 1
6 Lantai - 4
- Instalasi Telepon di dinding dengan Cable ttk 41
ITC 2 x 2 x 0,6 mm di dalam PVC HI dia. 20 mm2
- Telepon Outlet, bh 41
- TB-Tel - lt.4 (Terminal box 40 pairs) unit 1
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
8 Kabel Riser
- Kabel OTC 20 x 2 x 0,6 mm2 dari Box Telkom ke MTB m 95
- Kabel ITC 20 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt. Dasar m 38
- Kabel ITC 20 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt. 1 m 46
- Kabel ITC 40 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt. 2 m 56
- Kabel ITC 40 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt. 3 m 66
- Kabel ITC 40 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt. 4 m 76
- Kabel ITC 40 x 2 x 0,6 mm2 dari MTB ke TB TEL/Lt. 5 m 86
1. Peralatan Utama
- Server unit 1
- Patch Panel unit 6
- Panel Server unit 1
3. Lantai - Dasar
- Outlet Data bh 16
- Instalasi Data , UTP CAT 6 + PVC Conduit HI Ø20mm ttk 16
4. Lantai - 1
- Outlet Data bh 41
- Instalasi Data , UTP CAT 6 + PVC Conduit HI Ø20mm ttk 41
5. Lantai - 2
- Outlet Data bh 41
- Instalasi Data , UTP CAT 6 + PVC Conduit HI Ø20mm ttk 41
6. Lantai - 3
- Outlet Data bh 41
- Instalasi Data , UTP CAT 6 + PVC Conduit HI Ø20mm ttk 41
7. Lantai - 4
- Outlet Data bh 41
- Instalasi Data , UTP CAT 6 + PVC Conduit HI Ø20mm ttk 41
1. Peralatan Utama
- MCFA Full Addressable , 3 Loop c/w Battery & Charging unit 1
- Announciator (di Security) unit 1
- Material Bantu lot 1
2 Lantai - Basement
- Terminal Box (TB-FA), 20 pairs bh 1
- Rate of Rise detector bh 65
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
4 Lantai - 1
- Terminal Box (TB-FA), 20 pairs bh 1
- Rate of Rise detector bh 22
- Smoke detector photoelectric bh 41
- Heat detector bh 6
- Gas detector bh 4
- End Line Resistor bh 4
- Alarm bell bh 4
- Warning lamp bh 4
- Manual call point bh 4
- Instalasi Manual call point FRC 2 x 1,5 mm2 ttk 4
- Instalasi indicator lamp FRC 2 x 1,5 mm2 ttk 4
- Instalasi alarm bell FRC 2 x 1,5 mm2 ttk 4
- Instalasi Detector FRC 2 x 1,5 mm2 ttk 69
5 Lantai - 2
- Terminal Box (TB-FA), 20 pairs bh 1
- Smoke detector photoelectric bh 41
- Rate of Rise detector bh 22
- End Line Resistor bh 6
- Alarm bell bh 4
- Warning lamp bh 4
- Manual call point bh 4
- Instalasi Manual call point FRC 2 x 1,5 mm2 ttk 4
- Instalasi indicator lamp FRC 2 x 1,5 mm2 ttk 4
- Instalasi alarm bell FRC 2 x 1,5 mm2 ttk 4
- Instalasi Detector FRC 2 x 1,5 mm2 ttk 63
6 Lantai - 3
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
8 Kabel Riser
Dari MTB ke :
- TB-FA LT/SB , FRC 2x2x1,5 mm2 m 50
- TB-FA LT/Dasar , FRC 2x2x1,5 mm2 m 50
- TB-FA LT/ 1, FRC 2x2x1,5 mm2 m 65
- TB-FA LT/ 2, FRC 2x2x1,5 mm2 m 73
- TB-FA LT/ 3 FRC 2x2x1,5 mm2 m 73
- TB-FA LT/ 4 FRC 2x2x1,5 mm2 m 82
2 Lantai - Basement
- Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm ttk 12
- Ceiling Speaker 3 Watt bh 12
- Horn Speaker 15W bh 24
- Instalasi Horn Speaker ttk 24
- TB-SS bh 1
3 Lantai - Dasar
- Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm ttk 37
- Ceiling Speaker 3 Watt bh 34
- Box Speaker 3 Watt bh 3
- Instalasi Volume Kontrol ttk 5
- Volume control bh 5
- TB-SS bh 1
4 Lantai - 1
- Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm ttk 60
- Ceiling Speaker 3 Watt bh 57
- Box Speaker 3 Watt bh 3
- Instalasi Volume Kontrol ttk 8
- Volume control bh 8
- TB-SS bh 1
5 Lantai - 2
- Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm ttk 59
- Ceiling Speaker 3 Watt bh 57
- Box Speaker 3 Watt bh 2
- TB-SS bh 1
6 Lantai - 3
- Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm ttk 59
- Ceiling Speaker 3 Watt bh 57
- Box Speaker 3 Watt bh 2
- TB-SS bh 1
7 Lantai - 4
- Instalasi dgn kabel NYMHY 3 x 1.5 mm didalam PVCHI dia.20 mm ttk 59
- Ceiling Speaker 3 Watt bh 57
- Box Speaker 3 Watt bh 2
- TB-SS bh 1
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
E. INSTALASI MATV
1. Peralatan Utama
- Satellite Cakrawarta, dia. 80 Cm (Fixed) set 1
- Satellite Asiasat - 3 , Asiasat - 2 ,dia. 12 feet c/w double line rotate set 1
- Antenna UHF - 1 unit 1
- Antenna UHF - 2 unit 1
- Antenna VHF unit 1
- Indovision Decoder /Telkom Vision unit 1
- Modulator unit 10
- Receiver & Modulator unit 7
- Channel Amplifier Proccessor unit 32
- 2 way Combiner (passive combiner) unit 1
- Attenuator unit 1
- TV Monitor unit 1
- Back up battery 1 jam unit 1
- Rectifier unit 1
- Surge Arrester unit 1
- Power Supply unit 6
2. Lantai - Dasar
- Instalasi Outlet TV ttk 16
- Outlet TV bh 16
Booster unit 1
- Instalasi Spliter ttk 7
- Splitter 2 ways unit 3
- Splitter 3ways unit 2
- Splitter 5 ways unit 2
3. Lantai - 1
- Instalasi Outlet TV ttk 41
- Outlet TV bh 41
- Booster unit 1
- Instalasi Directional coupler ttk 5
- Directional coupler 4 ways bh 5
- Instalasi Spliter ttk 3
- Splitter 2 ways unit 2
- Splitter 3 ways unit 1
- Splitter 4 ways unit 2
4. Lantai - 2
- Instalasi Outlet TV ttk 41
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
5. Lantai - 3
- Instalasi Outlet TV ttk 41
- Outlet TV bh 41
- Booster unit 1
- Instalasi Directional coupler ttk 5
- Directional coupler 4 ways bh 5
- Instalasi Spliter ttk 3
- Splitter 2 ways unit 2
- Splitter 3 ways unit 1
- Splitter 4 ways unit 2
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
F. INSTALASI CCTV
1. Peralatan Utama
16 Channel Quadruplex Digital Video Recorder, Compression : unit 2
MPEG4, CD - RW & USB back up; 1 HDD 750GB; Multi user up
to 5 user
29" Flat Color Multiplexer unit 2
UPS ICA 3000 VA unit 2
2. Lantai - Basement
- Instalasi CCTV, Kabel Coaxial 7C-5V + NYM 3x2,5mm² ttk 22
- Fixed Dome Camera color Pan Tilt & zoom bh 6
- Fixed Camera color Pan Tilt & zoom bh 16
2. Lantai - Dasar
- Instalasi CCTV, Kabel Coaxial 7C-5V + NYM 3x2,5mm² ttk 8
- Fixed Dome Camera color Pan Tilt & zoom bh 6
- Fixed Camera color Pan Tilt & zoom bh 2
3. Lantai - 1
- Instalasi CCTV, Kabel Coaxial 7C-5V + NYM 3x2,5mm² ttk 9
- Fixed Dome Camera color Pan Tilt & zoom bh 9
4. Lantai - 2
- Instalasi CCTV, Kabel Coaxial 7C-5V + NYM 3x2,5mm² ttk 9
- Fixed Dome Camera color Pan Tilt & zoom bh 9
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
5. Lantai - 3
- Instalasi CCTV, Kabel Coaxial 7C-5V + NYM 3x2,5mm² ttk 9
- Fixed Dome Camera color Pan Tilt & zoom bh 9
6. Lantai - 4
- Instalasi CCTV, Kabel Coaxial 7C-5V + NYM 3x2,5mm² ttk 9
- Fixed Dome Camera color Pan Tilt & zoom bh 9
7. Lantai - 5
- Instalasi CCTV, Kabel Coaxial 7C-5V + NYM 3x2,5mm² ttk 6
- Fixed Dome Camera color Pan Tilt & zoom bh 6
KABEL TRAY
1 Lantai - Basement
- Tray W 300 x 100 m' 42
- Tray W 200 x 100 m' 60
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
2 Lantai -DASAR
- Tray W 300 x 100 m' 38
- Tray W 200 x 100 m' 91
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
3. Lantai - 1
- Tray W 300 x 100 m' 40
- Tray W 200 x 100 m' 40
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
4. Lantai - 2
- Tray W 300 x 100 m' 40
- Tray W 200 x 100 m' 40
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
5. Lantai - 3
- Tray W 300 x 100 m' 40
- Tray W 200 x 100 m' 40
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
6. Lantai - 4
- Tray W 300 x 100 m' 40
- Tray W 200 x 100 m' 40
- Aksesories untuk Tray lot 1
- Hanger & Support lot 1
7. Lantai - 5
- Tray W 300 x 100 m' 30
- Tray W 200 x 100 m' 30
- Aksesories untuk Tray lot 1
BILL OF QUANTITY
PEKERJAAN ELEKTRONIK
PROYEK : VEASNA BEACH FRONT SUITES
8. Painting lot 1