JUM
NO URAIAN PEKERJAAN
A PEKERJAAN PERSIAPAN
I PEKERJAAN PERSIAPAN
JUMLAH A
B. PEKERJAAN STRUKTUR
I. PEKERJAAN GALIAN DAN URUGAN TANAH
II. PEKERJAAN PONDASI
III. PEKERJAAN BETON PILE CAP
IV. PEKERJAAN BETON LANTAI 1(Elevasi -0.05 m)
V. PEKERJAAN BETON LANTAI 2 (Elevasi 4.15 m)
VI. PEKERJAAN BETON LANTAI 3 (Elevasi 8.35 m)
VII. PEKERJAAN BETON LANTAI 4 (Elevasi 12.55 m)
VIII. PEKERJAAN BETON LANTAI ATAP (Elevasi 16.75 m)
XI. PEKERJAAN ATAP
JUMLAH B
C. PEKERJAAN ARSITEKTUR
I. PEKERJAAN FINISHING LUAR & AREA BANGUNAN DEPAN
II. PEKERJAAN DINDING & PLESTERAN
III. PEK. KUSEN PINTU/JENDELA ALUMINIUM ANODIZE
IV. PEKERJAAN PLAFOND
V. PEKERJAAN LANTAI
VI. PEKERJAAN FINISHING & PENGECATAN
VII. PEKERJAAN GROUND TANK + RUMAH POMPA
VIII PEKERJAAN RUANG GENSET
JUMLAH C
D. PEKERJAAN SANITAIR
I PEKERJAAN SANITAIR LENGKAP ASESORIS
JUMLAH D
E PEKERJAAN MEKANIKAL - ELEKTRIKAL
PEKERJAAN STANDAR
I PEKERJAAN INSTALASI LISTRIK
II PEKERJAAN INSTALASI AIR BERSIH
III PEKERJAAN AIR KOTOR DAN AIR BEKAS
Bandung,…………………
Penawar,
Direktur
REKAPITULASI
OF QUANTITY (BOQ)
ETAHUAN (KNOWLEDGE CENTER) UNPAD-PERTAMINA
I UKUR NO. 35 BANDUNG
UN ANGGARAN 2013 )
JUMLAH HARGA
(RP.)
Bandung,………………….2013
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER) UN
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
A PEKERJAAN PERSIAPAN
I PEKERJAAN PERSIAPAN
1.1 Papan nama proyek unit 1.00
1.2 Pekerjaan pengukuran lahan m² 680.00
1.3 Penyediaan Listrik kerja selama pelaksanaan bln 6.00
1.4 Penyediaan Air bersih selama masa pelaksanaan bln 6.00
1.5 Sewa Tower Crane bln 4.00
1.6 Pekerjaan kantor direksi m² 36.00
1.7 Los kerja dan gudang m² 16.00
1.8 Pagar seng keliling proyek h = 1.80 m¹ 225.00
1.9 Pek. pasang bouwplank m¹ 180.00
1.10 Asuransi (ASTEK, CAR & TPL) ls 1.00
1.11 Pek. Administrasi & Perijinan (IMB dll) ls 1.00
1.12 Pekerjaan anti rayap (termite control) m² 580.00
1.13 Pekerjaan Perbaikan Jalan Hotmix t = 3cm m² 201.56
BILL OF QUANTITY (BOQ)
PENGETAHUAN (KNOWLEDGE CENTER) UNPAD-PERTAMINA
IPATI UKUR NO. 35 BANDUNG
TAHUN ANGGARAN 2013 )
Jumlah A
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER) UNPAD
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
II PEKERJAAN PONDASI
2.1 Pekerjaan Pondasi Strauss Pile dia. 0,35 m (L=8,4 m)
Beton K - 250 m3 33.15
Besi 8 D 19 (2.230 kg/m) Kg 6,699.99
Sengkang Ø 10 (0.617 Kg/m) Kg 1,868.94
Pasir Urug 100 mm m 3
0.39
Lantai Kerja 50 mm m3 0.20
2.2 PDA Test pile sesuai spesifikasi dan disetujui oleh MK titik 3.00
2.3 Pekerjaan aanstamping m3 18.53
2.4 Pekerjaan pondasi batu belah (1:5) m 3
50.95
2.5 Pekerjaan sloof praktis m3 3.47
IX PEKERJAAN ATAP
9.1 PEKERJAAN ATAP
a. Rangka atap baja ringan m2 216.75
b. Penutup atap zinkalum (t=0,75 mm) m2 216.75
d. Lisplank GRC 60 cm (t=9 mm) m' 69.60
e. Insulasi : aluminium foil (2 lapis) + glasswool + kawat ayam m2 216.75
OF QUANTITY (BOQ)
ETAHUAN (KNOWLEDGE CENTER) UNPAD-PERTAMINA
I UKUR NO. 35 BANDUNG
N ANGGARAN 2013 )
- -
- -
- -
- -
- -
- -
Sub Jumlah I -
-
-
-
-
-
-
-
-
-
Sub Jumlah II -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sub Jumlah III -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
Sub Jumlah IV -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sub Jumlah V -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sub Jumlah VI -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
Sub Jumlah VII -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
Harga Satuan Jumlah Harga
(Rp.) (Rp.)
5 6
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
Sub Jumlah VIII -
-
-
-
-
Sub Jumlah IX -
Jumlah B -
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER) UN
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
C. PEKERJAAN ARSITEKTUR
I PEKERJAAN FINISHING LUAR & AREA BANGUNAN DEPAN
1 Pekerjaan Galian Tanah 5.93 m3
2 Pekerjaan Pondasi batu Belah 1 : 5 5.56 m3
3 Pekerjaan Pemasangan Gravel Dia 20 + Galian Tanah + Pas.Bata 1 : 3 39.65 m
4 Pekerjaan Poer Plat 100x100x25, K-175, Entrance
Beton K 250 0.50 m3
Besi D13-150 (1.042 Kg/m) 126.33 Kg
Bekisting pas. Bata 1: 5 2.20 m2
Pasir Urug 100 mm 0.20 m3
Lantai Kerja 50 mm 0.10 m3
5 Pekerjaan kolom 20/70, K-175
Beton K 250 1.54 m3
Besi D13-150 (1.042 Kg/m) 83.20 Kg
Sengkang+Ties Ø 10 (0.617 Kg/m) 70.22 Kg
Bekisting Multipleks Kolom 12.67 m2
6 Pekerjaan kolom 20/20, K-175
Beton K 250 0.36 m3
Besi D13-150 (1.042 Kg/m) 158.33 Kg
Sengkang+Ties Ø 10 (0.617 Kg/m) 97.13 Kg
Bekisting Multipleks Kolom 20.00 m2
7 Pekerjaan ring balok 15/20, K-175
Beton K 175 1.43 m3
Besi D10-150 (1.042 Kg/m) 129.56 Kg
Sengkang+Ties Ø 10 (0.617 Kg/m) 120.11 Kg
Bekisting Multipleks Ring Balok 13.33 m2
8 Pekerjaan balok Lintel 20/40, K-175
Beton K 175 4.23 m3
Besi D10-150 (1.042 Kg/m) 138.54 Kg
Sengkang+Ties Ø 10 (0.617 Kg/m) 76.31 Kg
Bekisting Multipleks 12.50 m2
9 Pekerjaan Pasangan 1/2 bata 1 : 3 (Blombak) 29.80 m2
10 Pekerjaan Plesteran + acian 1 : 3 25.33 m2
11 Pekerjaan Pemasangan Dinding Andesit (Blombak) 9.44 m2
12 Pekerjaan Pemasangan Dinding Andesit (Fasade) 30.60 m2
13 Pekerjaan Tali air luar dinding exterior 2,447.78 m1
14 Pekerjaan Lantai Granit Tile 60 x 60,entrance 6.11 m2
15 Pekerjaan Dinding fasade Granit Tile 60x60 cm 28.46 m2
16 Pekerjaan Dinding Existing Granit Tile 60x60cm 10.45 m2
17 Pekerjaan Lantai Kramik Rock Tile 60 x 60cm 7.44 m2
NO URAIAN PEKERJAAN VOLUME SAT
30 Pasang Kaca Warna t =8mm + R.Alumunium Warna Anodize Fasade (JL.6) 1.00 unit
31 Pasang Kaca Warna t =8mm + R. Alumunium Warna Fasade (JL.11) 1.00 unit
II.b LANTAI 2
1 Pasangan dinding 1/2 bata 1 : 3 16.43 m2
2 Pekerjaan plesteran 1:3 dan acian dinding 32.86 m2
3 Pasangan dinding 1/2 bata 1 : 5 414.94 m2
4 Pekerjaan plesteran 1:5 dan acian dinding 829.89 m2
5 Pekerjaan Tali air dinding exterior 183.96 m1
6 Pekerjaan Ban-banan dinding 136.89 m1
8 Pekerjaan dinding keramik pantry 25 X 45, h= 1,35m 10.01 m2
9 Pekerjaan Dinding granit 60 x 60 , sek. Vicenza garda Lif 5.48 m2
10 Pekerjaan keramik meja pantry 20x20 Roman 1.10 m2
11 Pekerjaan Tempat Wudhu 1.00 Unit
12 Pek. Railling Tangga Depan ( Pipa Stainless steel + Hallow) 10.80 m'
13 Pek. Railling Tangga Belakang (Pipa Stainless Steel + Hallow ) 10.32 m'
14 Pekerjaan Finishing Kolom + Topi Acian Beton 309.47 m2
15 Pekerjaan partisi double gypsum rangka hollow 245.51 m2
16 Pek. Kolom praktis Dalam & Luar 12/12, K-175 3.70 m3
NO URAIAN PEKERJAAN VOLUME SAT
II.c LANTAI 3
1 Pasangan dinding 1/2 bata 1 : 3 1.60 m2
2 Pekerjaan plesteran 1:3 dan acian dinding 3.20 m2
3 Pasangan dinding 1/2 bata 1 : 5 233.51 m2
4 Pekerjaan plesteran 1:5 dan acian dinding 467.01 m2
5 Pekerjaan Ban-banan dinding 136.89 m1
6 Pekerjaan Finishing Kolom + Topi Acian Beton 305.03 m2
7 Pekerjaan Balok lintel, k-175 0.13 m3
8 Pekerjaan Topi Beton 12cm 1.07 m3
9 Pekerjaan Finishing Lubang Kusen dengan plesteran 1:5 dan acian 25.60 m2
10 Pekerjaan beton K-175 untuk dudukan partisi (10/20) tanpa tulangan 11.17 m3
11 Pekerjaan Tempat Wudhu 1.00 Unit
11 Pekerjaan partisi double gypsum rangka hollow 142.70 m2
12 Pekerjaan Dinding granit 60 x 60 , sek. Vicenza garda Lif 5.47 m2
13 Pek. Railling Tangga Depan ( Pipa Stainless steel + Hallow) 10.80 m'
14 Pek. Railling Tangga Belakang (Pipa Stainless Steel + Hallow ) 10.32 m'
15 Pekerjaan meja wastafel Toilet Pria / Wanita
a. Pasangan dinding 1/2 bata 1:5 (h=78 cm) 2.81 m2
b. Pek. Kolom praktis 12/12, K-175 (h=90 cm) 0.16 m3
c. Pek. Balok praktis 12/15, K-175 0.06 m3
d. Pek. Plat meja beton K-175, besi Ø 8 - 150 (2 lapis) 0.18 m3
e. Pek. Plesteran + acian dinding 1:5 5.62 m2
f. Pek. Pasangan keramik meja wastafel 20x20 cm 1.80 m2
g. Pek. Cermin befel 2.43 m2
16 Pek. Meja Beton (Pantry)
a. Pasangan dinding 1/2 bata 1:5 (h=78 cm) 1.40 m2
b. Pek. Kolom praktis 12/12, K-175 (h=90 cm) 0.08 m3
c. Pek. Balok praktis 12/15, K-175 0.03 m3
d. Pek. Plat meja beton K-175, besi Ø 8 - 150 (2 lapis) 0.20 m3
e. Pek. Plesteran + acian dinding 1:5 2.81 m2
f. Pek. Plesteran + Acian meja beton 1:5 4.26 m2
g. Pek. Finishing ujung meja dengan acian 15.70 m'
h. Pek. Pasangan keramik meja & Dinding 20x20 cm Sek. Roman 2.12 m2
I Lemari Furniture Custom Pantry (FC.3) 1.00 Unit
II.d LANTAI 4
1 Pasangan dinding 1/2 bata 1 : 3 18.90 m2
2 Pekerjaan plester dan acian dinding 1 : 3 37.80 m2
3 Pasangan dinding 1/2 bata 1 : 5 435.38 m2
4 Pekerjaan plester dan acian dinding 1 : 5 870.76 m2
5 Pekerjaan Finishing Kolom + Topi Acian Beton 309.91 m2
6 Pekerjaan Tali air dinding exterior 57.00 m1
7 Pekerjaan Ban-banan dinding 136.89 m1
8 Pekerjaan partisi double gypsum rangka hollow 155.93 m2
9 Pekerjaan Balok lintel 0.13 m3
10 Pekerjaan Topi Beton 12cm 1.15 m3
11 Pekerjaan Dinding granit garda Lif 5.64 m2
12 Pekerjaan Finishing Lubang Kusen dengan plesteran 1:5 dan acian 25.60 m2
13 Pekerjaan beton K-175 untuk dudukan partisi (10/20) tanpa tulangan 11.17 m3
NO URAIAN PEKERJAAN VOLUME SAT
III.b LANTAI 2
1 Pasang Kusen Allumunium Warna +Pintu Type P2 2.00 Unit
2 Pasang Kusen Allumunium Warna +Pintu Type P3 4.00 Unit
3 Pasang Kusen Allumunium Warna +Pintu Type P4 4.00 Unit
3 Pasang Kusen Allumunium Warna +Pintu Type PS 3.00 Unit
4 Pasang Kusen Allumunium Warna +Jendela Type J3 1.00 Unit
5 Pasang Kusen Allumuinim Warna +Jendela Type J4 1.00 Unit
6 Pasang Kusen allumunium Warna +Jendela Type JL.1 5.00 Unit
7 Pasang Kusen Allumunium Warna +Jendela Type JL.2 3.00 Unit
8 Pasang Kusen Allumunium Warna +Jendela Type JL.3 2.00 Unit
9 Pasang Kusen Allumunium Warna +Jendela Type JL.4 2.00 Unit
NO URAIAN PEKERJAAN VOLUME SAT
III.c LANTAI 3
1 Pasang Kusen Allumunium Warna +Pintu Type P3 6.00 Unit
2 Pasang Kusen Allumunium Warna +Pintu Type P4 4.00 Unit
3 Pasang Kusen Allumunium Warna +Pintu Type PS 3.00 Unit
4 Pasang Kusen Allumunium Warna +Jendela Type J6 1.00 Unit
5 Pasang Kusen Allumunium Warna +Jendela Type J7 1.00 Unit
6 Pasang Kusen Allumunium Warna +Jendela Type J8 1.00 Unit
7 Pasang Kusen allumunium Warna +Jendela Type JL.1 5.00 Unit
8 Pasang Kusen allumunium Warna +Jendela Type JL.2 3.00 Unit
9 Pasang Kusen allumunium Warna +Jendela Type JL.3 2.00 Unit
10 Pasang Kusen allumunium Warna +Jendela Type JL.4 1.00 Unit
11 Pasang Kusen Allumuinium Warna +Pintu Type PJ7 1.00 Unit
12 Pasang Kusen Allumuinium Warna +Pintu Type PJ8 2.00 Unit
13 Pasang Kusen Allumuinium Warna +Pintu Type PJ9 1.00 Unit
14 Pasang Kusen Allumunium Warna +Jendela Type BV3 1.00 Unit
15 Pasang Kusen Allumunium Warna +Jendela Type BV4 1.00 Unit
16 Pasang Kusen Allumunium Warna +Jendela Type BV5 1.00 Unit
17 Pasang Kusen Allumunium Warna +Jendela Type BV6 1.00 Unit
18 Pasang Kusen Allumunium Warna +Jendela Type BV7 1.00 Unit
IV.a LANTAI 1
1 Pek. Plafond Gypsum 9 mm+Rangka Metal Furing 391.87 m2
2 Pek. Plafond Grc 4 mm+ Rangka Furing (Toilet+KM) 19.80 m2
3 Pek. Plafond Drop Ceiling Gypsum 9mm 52.13 m2
4 Pek. Plafond Selasar Gypsum 9 mm+Rangka Furing 84.72 m2
5 Pekerjaan List profil gipsum 353.42 m'
NO URAIAN PEKERJAAN VOLUME SAT
IV.b LANTAI 2
1 Pek. Plafond Gypsum 9 mm+Rangka Metal Furing 457.45 m2
2 Pek. Plafond Grc 4 mm+ Rangka Furing (Toilet+KM) 28.24 m2
3 Pekerjaan List profil gipsum 406.68 m'
IV.c LANTAI 3
1 Pek. Plafond Gypsum 9 mm+Rangka Metal Furing 483.92 m2
2 Pek. Plafond Grc 4 mm+ Rangka Furing (Toilet+KM) 31.40 m2
3 Pekerjaan List profil gipsum 399.16 m'
IV.d LANTAI 4
1 Pek. Plafond Gypsum 9 mm+Rangka Metal Furing 481.35 m2
2 Pek. Plafond Grc 4 mm+ Rangka Metal Furing (Toilet+KM) 30.20 m2
3 Pek. Plafond Calsiboard 4 mm+ Rangka Metal Fuirng (Overstek atap) 121.09 m2
4 Pekerjaan List profil gipsum 352.10 m'
NO URAIAN PEKERJAAN VOLUME SAT
V. PEKERJAAN LANTAI
V.a LANTAI 1
1 Urugan pasir bawah lantai t=10 cm 40.13 m3
2 Lantai kerja t = 5 cm 20.06 m3
3 Pekerjaan Lantai Kramik Selasar 40X40 84.72 m2
4 Pekerjaan Lantai Granit Tile 60X60 cm Ruangan dalam 401.25 m2
5 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Depan ) 53.28 m2
6 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Belakng ) 53.28 m2
7 Pekerjaan Plin Kramik 10 x 60 ,dengan plesteran+acian 1:3 42.22 m2
8 Pekerjaan lantai keramik 25X25 cm, ( Toilet ) 18.80 m2
9 Pekerjaan dinding keramik 25X45 cm 82.25 m2
10 Pekerjaan Step Nozing tangga 10X60 cm 115.00 m'
V.b LANTAI 2
1 Urugan pasir bawah lantai t=5 cm 39.64 m3
2 Pekerjaan Lantai Granit Tile 60X60 cm Ruangan dalam 486.68 m2
3 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Depan ) 53.28 m2
4 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Belakng ) 53.28 m2
5 Pekerjaan lantai Rock Tile 60X60 cm (Entrance Luar) 16.86 m2
6 Pekerjaan Plin Kramik 10 x 60 ,dengan plesteran+acian 1:3 42.22 m2
7 Pekerjaan Step Nozing tangga 10X60 cm 115.00 m'
8 Pekerjaan lantai keramik 25X25 cm, ( Toilet ) 28.24 m2
9 Pekerjaan dinding keramik 25X45 cm 111.38 m2
V.c LANTAI 3
1 Urugan pasir bawah lantai t=5 cm 23.70 m3
2 Pekerjaan Lantai Granit Tile 60X60 cm Ruangan dalam 474.05 m2
3 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Depan ) 53.28 m2
4 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Belakng ) 53.28 m2
5 Pekerjaan Plin Kramik 10 x 60 , dengan plesteran+acian 1:3 42.22 m2
6 Pekerjaan lantai keramik 25X25 cm, ( Toilet ) 30.20 m2
7 Pekerjaan dinding keramik 25X45 cm 139.98 m2
V.d LANTAI 4
1 Urugan pasir bawah lantai t=5 cm 79.29 m3
2 Pekerjaan Lantai Granit Tile 60X60 cm Ruangan dalam 481.35 m2
3 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Depan ) 53.28 m2
4 Pekerjaan lantai Granit Tile 60X60 cm (Tangga Belakng ) 53.28 m2
5 Pekerjaan Plin Kramik 10 x 60 , dengan plesteran+acian 1:3 66.13 m2
6 Pekerjaan lantai keramik 25X25 cm, ( Toilet ) 30.20 m2
7 Pekerjaan dinding keramik 25X45 cm 139.98 m2
VI.b LANTAI 2
1 Pekerjaan pengecatan dinding Exterior weathear shield 862.75 m2
2 Pekerjaan pengecatan dinding Interior partisi 491.01 m2
3 Pekerjaan pengecatan plafond 511.68 m2
4 Pekerjaan Waterproofing Emultion KM/WC 60.63 m2
NO URAIAN PEKERJAAN VOLUME SAT
VI.c LANTAI 3
1 Pekerjaan pengecatan dinding Exterior weathear shield 470.21 m2
2 Pekerjaan pengecatan dinding Interior partisi 285.40 m2
3 Pekerjaan pengecatan plafond 509.68 m2
4 Pekerjaan Waterproofing Emultion KM/WC 55.85 m2
VI.d LANTAI 4
1 Pekerjaan pengecatan dinding Exterior weathear shield 473.18 m2
2 Pekerjaan pengecatan dinding Interior partisi 311.86 m2
3 Pekerjaan pengecatan plafond 509.68 m2
4 Pekerjaan Waterproofing Emultion KM/WC 85.09 m2
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
SUB JUMLAH I -
-
-
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH II.a -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH II.b -
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
-
-
-
-
-
-
-
SUB JUMLAH II.c -
-
-
-
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH II.e -
JUMLAH - II -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH III.a -
-
-
-
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH III.b -
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
- -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH III.c -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUB JUMLAH III.d -
JUMLAH - III -
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
SUB JUMLAH IV.a -
- -
- -
- -
SUB JUMLAH IV.b -
- -
- -
- -
SUB JUMLAH IV.c -
- -
- -
- -
- -
SUB JUMLAH IV.d -
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
- -
- -
SUB JUMLAH IV.e -
JUMLAH - IV -
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH V.a -
- -
- -
- -
- -
- -
- -
- -
- -
- -
SUB JUMLAH V.b -
- -
- -
- -
- -
- -
- -
- -
SUB JUMLAH V.c -
- -
- -
- -
- -
- -
- -
- -
SUB JUMLAH V.d -
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
SUB JUMLAH V.e -
JUMLAH - V -
- -
- -
- -
SUB JUMLAH VI.a -
-
-
-
-
SUB JUMLAH VI.b -
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
SUB JUMLAH VI.c -
- -
- -
- -
- -
SUB JUMLAH VI.d -
- -
- -
- -
SUB JUMLAH VI.e -
JUMLAH - VI -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
-
-
-
-
-
-
-
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
JUMLAH - VII -
HARGA SATUAN
JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH VIII -
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER) UNP
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
D. PEKERJAAN SANITAIR
I PEKERJAAN SANITAIR LENGKAP ASESORIS
a. LANTAI 1
1 Floor drained Stainless Steel 6.00 bh
2 Kran air 1/2" 7.00 bh
3 Kran Air Leher Angsa 1.00 bh
4 Kran Air Wastafel 2.00 bh
5 Closet Duduk 4.00 unit
6 Jet Washer 4.00 bh
7 Tisue Holder 4.00 bh
8 Washtafel Bulat + Accecories 2.00 bh
9 Bak cuci piring Stainlessteel 1.00 bh
b. LANTAI 2
1 Floor drained Stainless Steel 6.00 bh
2 Kran air 1/2" 6.00 bh
3 Kran Air Wastafel 2.00 bh
4 Closet Duduk 4.00 unit
5 Urinoir U57M " TOTO", Setara 3.00 unit
6 Skat Urinoir 2.00 unit
7 Jet Shower 4.00 bh
8 Tisue Holder 2.00 bh
9 Washtafel Bulat + Accecories 2.00 bh
c. LANTAI 3
1 Floor drained Stainless Steel 6.00 bh
2 Kran air 1/2" 6.00 bh
3 Kran Air Leher Angsa 1.00 bh
4 Kran Air Wastafel 2.00 bh
5 Closet Duduk 1.00 unit
6 Urinoir U57M " TOTO", Setara 3.00 bh
7 Sekat Urinoir 4.00 bh
8 Jet Shower 1.00 bh
9 Tisue Holder 1.00 bh
10 Bak cuci piring Stainlessteel 1.00 bh
11 Washtafel Bulat + Accecories 2.00 unit
c. LANTAI 4
1 Floor drained Stainless Steel 6.00 bh
2 Kran air 1/2" 6.00 bh
3 Kran Air Leher Angsa 1.00 bh
4 Kran Air Wastafel 2.00 bh
NO URAIAN PEKERJAAN VOLUME SAT
T O T A L PEKERJAAN
GE CENTER) UNPAD-PERTAMINA
UNG
HARGA SATUAN
TOTAL JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
-
-
SUB JUMLAH a -
-
-
-
-
-
-
-
-
-
SUB JUMLAH b -
-
-
-
-
-
-
-
-
-
-
-
SUB JUMLAH b -
-
-
-
-
HARGA SATUAN
TOTAL JUMLAH HARGA
(RP.) (RP.)
-
-
-
-
-
-
-
SUB JUMLAH d -
T O T A L PEKERJAAN SANITARY -
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
LANTAI - III
a. Pekerjaan Instalasi :
1 Instalasi Titik Penerangan & Fan
2 Instalasi Titik Stopkontak
b. Pekerjaan Pengadaan & Pemasangan Armature :
1 Arm. RMI.236 Philips, TLD 2 x 36 W, Setara
2 Arm. V.Shape 136 Philips, TLD 1 x 36 W, Setara
3 Arm. V.Shape 118 Philips, TLD 1 x 18 W, Setara
4 Arm. GMS.118 Philips, TLD 1 x 18 W, Setara
5 Arm. DL.5.18 Philips, Esensial 18 W, Setara
6 Exhaust Fan dia. 10 " Panasonic, 25TGU2, Setara
7 Flexibel dia. 4 "
8 Saklar Engkle Legrand, Valena, Setara
9 Saklar Serie Legrand, Valena, Setara
10 Saklar Serie Hotel Legrand, Valena, Setara
11 Stopkontak Legrand, Valena, Setara
c. Pekerjaan Panel :
1 Panel Lantai III LP.L3 & AC
MCCB 60 A, 3 pole MG, NS100N TM16-100D3P3T, Setara
MCB 6 A, 1 pole MG, Domae, 4,5 KA, Setara
MCB 10 A, 1 pole MG, Domae, 4,5 KA, Setara
MCB 16 A, 1 pole MG, NC45N - 8 KA, Setara
MCB 16 A, 3 pole MG, NC45N - 8 KA, Setara
Amper Meter 100 A GAE, Setara
Volt Meter 500 V GAE, Setara
Current Traffo 100/5A GAE, Setara
Selector Switch Telemecanique, Setara
Pilot Lamp Telemecanique, Setara
Fuse Pilot Lamp Telemecanique, Setara
Wiring & Busbar 4 x ( 15 x 3 mm )
Panel Kosong uk. 80 x 60 x 25 cm
Ongkos Pasang & stel
d. Pekerjaan Kabel Tray & Grounding :
1 Kabel Grounding - Pentanahan LP.L3 & AC
2 Tray Cable 100 x 100 x 2 mm, berikut Hanger
3 Tray Cable 200 x 100 x 2 mm, berikut Hanger
4 Asessories & Peralatan bantu
e. Commisioning Test :
sub Jumlah Pek. Lantai III
LANTAI - IV
a. Pekerjaan Instalasi :
1 Instalasi Titik Penerangan & Fan
2 Instalasi Titik Stopkontak
b. Pekerjaan Pengadaan & Pemasangan Armature :
1 Arm. RMI.236 Philips, TLD 2 x 36 W, Setara
2 Arm. V.Shape 136 Philips, TLD 1 x 36 W, Setara
3 Arm. V.Shape 118 Philips, TLD 1 x 18 W, Setara
4 Arm. GMS.118 Philips, TLD 1 x 18 W, Setara
5 Arm. DL.5.18 Philips, Esensial 18 W, Setara
No. Uraian Pekerjaan
LANTAI - II
a. Pekerjaan Instalasi :
1 Instalasi Titik Outlet Telephone
2 Sparring kabel
b. Pekerjaan Pengadaan & Pemasangan Fixture Telp. :
1 Pesawat Telephone LG, SLT-GS-5160, Setara
2 Outlet Telephone Legrand, Valena, Setara
e. Commisioning Test :
sub Jumlah Pek. Lantai II
LANTAI - III
a. Pekerjaan Instalasi :
1 Instalasi Titik Outlet Telephone
2 Sparring kabel
b. Pekerjaan Pengadaan & Pemasangan Fixture Telp. :
1 Pesawat Telephone LG, LKD-30-D, Setara
2 Pesawat Telephone LG, SLT-GS-5160, Setara
3 Outlet Telephone Legrand, Valena, Setara
c. Pekerjaan Panel :
1 Panel Box Telephone PBT.L3
d. Pekerjaan Grounding & Tray Cable :
1 Kabel Grounding - Pentanahan
2 Tray Cable 100 x 100 x 2 mm, berikut Hanger
3 Peralatan bantu
e. Commisioning Test :
sub Jumlah Pek. Lantai III
LANTAI - IV
a. Pekerjaan Instalasi :
1 Instalasi Titik Outlet Telephone
2 Sparring kabel
b. Pekerjaan Pengadaan & Pemasangan Fixture Telp. :
1 Pesawat Telephone LG, LKD-30-D, Setara
2 Pesawat Telephone LG, SLT-GS-5160, Setara
3 Outlet Telephone Legrand, Valena, Setara
c. Pekerjaan Panel :
1 Panel Box Telephone PBT.L4
d. Pekerjaan Grounding & Tray Cable :
1 Kabel Grounding - Pentanahan
2 Tray Cable 100 x 100 x 2 mm, berikut Hanger
3 Peralatan bantu
e. Commisioning Test :
sub Jumlah Pek. Lantai IV
LANTAI - II
a. Pekerjaan Instalasi :
1 Instalasi kabel + Conduit
b. Pekerjaan Pengadaan & Pemasangan Fixture FA :
1 Rate of Rise Detector Nittan, 2SC-LS, Setara
2 Manual Push Button Nittan, 1MFI-R, Setara
3 Indicator Lamp Panel Nittan, PL-R4/30R, Setara
4 Alarm Bell Nittan, BD-6-24-8, Setara
5 End of Line
6 Fire Extinguisher kap. 3 kg
7 Asessories & Peralatan bantu
c. Commissioning Test :
sub Jumlah Pek. Lantai II
LANTAI - III
a. Pekerjaan Instalasi :
1 Instalasi kabel + Conduit
b. Pekerjaan Pengadaan & Pemasangan Fixture FA :
1 Rate of Rise Detector Nittan, 2SC-LS, Setara
2 Manual Push Button Nittan, 1MFI-R, Setara
3 Indicator Lamp Panel Nittan, PL-R4/30R, Setara
4 Alarm Bell Nittan, BD-6-24-8, Setara
5 End of Line
6 Fire Extinguisher kap. 3 kg
7 Asessories & Peralatan bantu
c. Commissioning Test :
sub Jumlah Pek. Lantai III
LANTAI - IV
a. Pekerjaan Instalasi :
1 Instalasi kabel + Conduit
b. Pekerjaan Pengadaan & Pemasangan Fixture FA :
1 Rate of Rise Detector Nittan, 2SC-LS, Setara
2 Manual Push Button Nittan, 1MFI-R, Setara
3 Indicator Lamp Panel Nittan, PL-R4/30R, Setara
4 Alarm Bell Nittan, BD-6-24-8, Setara
5 End of Line
6 Fire Extinguisher kap. 3 kg
7 Asessories & Peralatan bantu
c. Commissioning Test :
sub Jumlah Pek. Lantai IV
- Chime Module
- Preamp Module + compressor
- AM/FM Radio Tuner Module
- Program Selector Module
- Selector Module (5 Zone)
- Line Amplifier Module
- Alert Signal Module
- Aux Input Module
- Paging Microphone
- Power Supply Module
- Mono Power Amplifier
- Junction Box
- Monitor Panel
- Power Switch Panel
- Blower Unit
- Blank Panel
- Perforated Panel
- Cabinet Rack
- Kabel Audio
- MDF
- CTB
- Ceiling Speaker
- Horn Speaker
Tape Player Merk Technics
CD Player Merk Technics, Philips, Kenwood, Setara
sub Jumlah Pek. Peralatan Utama
No. Uraian Pekerjaan
LANTAI - I
1 Ceiling Speaker 6 W, 100 V
2 Volume Control
3 Pemasangan Instalasi
sub Jumlah Pek. Lantai I
LANTAI - II
1 Ceiling Speaker 6 W, 100 V
2 Volume Control
3 Pemasangan Instalasi
sub Jumlah Pek. Lantai II
LANTAI - III
1 Ceiling Speaker 6 W, 100 V
2 Volume Control
3 Pemasangan Instalasi
sub Jumlah Pek. Lantai III
LANTAI - IV
1 Ceiling Speaker 6 W, 100 V
2 Volume Control
3 Pemasangan Instalasi
sub Jumlah Pek. Lantai IV
LANTAI - III
a. Pekerjaan Instalasi
1 Instalasi Pengkabelan AC 1 ph - NYY 3 x 2,5 qmm
2 Instalasi Pengkabelan AC 3 ph - NYY 4 x 4 qmm
b. Pekerjaan Pengadaan & Pemasangan Unit AC
1 AC.3.1 & AC.3.2 - R. Guru Besar
AC Cassette Type, Setara Daikin Type. R 71 - FHC 71 K
3 PK - 3 phase
2 AC.3.3 & AC.3.4 - R. Rapat
AC Cassette Type, Setara Daikin Type. R 60 - FHC 60 K
2 1/2 PK - 3 phase
3 AC.3.5 & AC.3.6 - R. Dosen - 1
AC Cassette Type, Setara Daikin Type. R 60 - FHC 60 K
2 1/2 PK - 3 phase
4 AC.3.7 & AC.3.8 - R. Dosen - 2
AC Cassette Type, Setara Daikin Type. R 60 - FHC 60 K
2 1/2 PK - 3 phase
5 AC.3.9 - R. Rapat Kecil
AC Cassette Type, Setara Daikin Type. R 60 - FHC 60 K
2 1/2 PK - 3 phase
6 AC.3.10 & AC.3.11 - Hall / Selasar
Single Split AC setara Daikin, 1 ph, 2 PK
sub Jumlah Lantai - III
LANTAI - IV
a. Pekerjaan Instalasi
1 Instalasi Pengkabelan AC 1 ph - NYY 3 x 2,5 qmm
Instalasi Pengkabelan AC 3 ph - NYY 4 x 4 qmm
b. Pekerjaan Pengadaan & Pemasangan Unit AC
1 AC.4.1 s/d AC 4.3 - R. Kasubag & Kemahasiswaan
AC Cassette Type, Setara Daikin Type. R 71 - FHC 71 K
3 PK - 3 phase
2 AC.4.4 & AC.4.5 - R. Kasubag & Staf
AC Cassette Type, Setara Daikin Type. R 60 - FHC 60 K
2 1/2 PK - 3 phase
3 AC.4.6 & AC.4.7 - R. Staf Kepegawaian
AC Cassette Type, Setara Daikin Type. R 71 - FHC 71 K
3 PK - 3 phase
4 AC.4.8 - R. Dharma Wanita
Single Split AC setara Daikin, 1 ph, 2 Type. R 50 - FT 50
5 AC.4.9 - R. Himpunan FEB
Single Split AC setara Daikin, 1 ph, 2 Type. R 50 - FT 50
6 AC.4.10 - R. BEM FEB
Single Split AC setara Daikin, 1 ph, 2 Type. R 50 - FT 50
7 AC.4.11 & AC.4.12 - H a l l
Single Split AC setara Daikin, 1 ph, 2 Type. R 50 - FT 50
sub Jumlah Lantai - IV
B TESTING & COMMISSIONING
1 Lifing & Setting Unit AC
2 Vacumizing / N2
No. Uraian Pekerjaan
3 Pengisian Refrigerant / R - 22
4 Start Up, Testing & Balancing
Sub Jumlah Testing & Commissioning
C LAIN - LAIN
1 Mobilisasi & demobilisasi material - alat kerja
2 Direksi keet & gudang material
3 Dudukan FCU & OCU - 1 phase
4 Dudukan FCU & OCU - 3 phase
5 Control Cabel 1 phase
6 Control Cabel 3 phase
Sub Jumlah Pekerjaan Lain - lain
No. Uraian Pekerjaan
Audio compression AAC LC 8 kHz, 16 kHz. G.711 PCM 8 kHz. G.726 ADPCM 8 kHz
No. Uraian Pekerjaan
NETWORK
Minimum : Proc setaraCore i5-2400S, 2GB DDR3,1TB HDD SATA,DVD±RW,VGA setara AMD Radeon HD
6450A 1 GB, Camera, Audio,NIC,WiFi, 21.5" WXGA,Win7 Home Premium 64 bit
TV-Monitoring
minimum :LED TV 42", Resolution Approx =1920 x 1080 , Aspect Ratio 16:9, Edge LED,USB,HDMI
Instalasi IP camerra
Menggunakan Cable UTP cat. 6, lengkap dengan outlet, instalasi terlindungi dalam pipa counduit
5 TV-Monitoring
minimum :LED TV 42", Resolution Approx =1920 x 1080 , Aspect Ratio 16:9, Edge LED,USB,HDMI
6 Instalasi IP camerra
Menggunakan Cable UTP cat. 6, lengkap dengan outlet, instalasi terlindungi dalam pipa counduit
148.0 tc
29.0 tc
20.0 set
2.0 set
1.0 set
2.0 set
32.0 set
72.0 set
7.0 set
4.0 set
4.0 set
4.0 set
6.0 m'
7.0 bh
15.0 bh
2.0 bh
29.0 bh
1.0 UNIT
2 bh
4 bh
3 bh
2 bh
2 bh
2 bh
6 bh
3 bh
2 bh
4 bh
1 bh
6 bh
2 bh
6 bh
2 bh
6 set
Volume Har. Sat. Jumlah
6 set
1 set
1 set
1 lot
1.0 UNIT
1 bh
15 bh
9 bh
3 bh
12 bh
3 bh
1 bh
3 bh
1 bh
3 set
3 set
1 set
1 set
1 lot
Volume Har. Sat. Jumlah
1.0 UNIT
1 bh
3 bh
3 bh
1 bh
3 set
3 set
1 set
1 set
1 lot
120.0 m'
8.0 m'
16.0 m'
22.0 m'
40.0 m'
40.0 m'
45.0 m'
8.0 m'
1.0 unit
1.0 unit
22.0 m'
10.0 m'
1.0 ls
1.0 ls
Rp -
88.0 tc
33.0 tc
28.0 set
1.0 set
1.0 set
4.0 set
46.0 set
4.0 set
4.0 set
6.0 m'
8.0 bh
10.0 bh
2.0 bh
33.0 bh
1.0 UNIT
1 bh
9 bh
Volume Har. Sat. Jumlah
6 bh
3 bh
12 bh
3 bh
1 bh
3 bh
1 bh
3 set
3 set
1 set
1 set
1 lot
1.0 unit
22.0 m'
10.0 m'
1.0 ls
1.0 ls
Rp -
Volume Har. Sat. Jumlah
91.0 tc
30.0 tc
24.0 set
2.0 set
2.0 set
4.0 set
55.0 set
4.0 set
6.0 m'
10.0 bh
11.0 bh
2.0 bh
30.0 bh
1.0 UNIT
1 bh
9 bh
6 bh
3 bh
12 bh
3 bh
1 bh
3 bh
1 bh
3 set
3 set
1 set
1 set
1 lot
1.0 ls
22.0 m'
10.0 m'
1.0 ls
1.0 ls
Rp -
84.0 tc
30.0 tc
29.0 set
1.0 set
2.0 set
4.0 set
44.0 set
Volume Har. Sat. Jumlah
4.0 set
6.0 m'
10.0 bh
11.0 bh
2.0 bh
30.0 bh
1.0 UNIT
1 bh
9 bh
6 bh
6 bh
8 bh
3 bh
1 bh
3 bh
1 bh
3 set
3 set
1 set
1 set
1 lot
Volume Har. Sat. Jumlah
1.0 ls
22.0 m'
10.0 m'
1.0 ls
1.0 ls
Rp -
6.0 tc
3.0 tc
5.0 set
1.0 set
2.0 bh
1.0 bh
1.0 bh
3.0 bh
1.0 UNIT
1 bh
3 bh
3 bh
3 set
3 set
1 set
1 set
1 lot
1.0 UNIT
bh
bh
bh
bh
set
set
set
set
lot
2.0 set
1.0 ls
1.0 ls
Rp -
Rp -
Volume Har. Sat. Jumlah
27.0 m¹
12.0 m¹
19.0 m¹
1.0 bh
2.0 bh
1.0 ls
1.0 ls
Rp -
25.0 m¹
7.0 m¹
21.0 m¹
1.0 ls
1.0 ls
Rp -
25.0 m¹
7.0 m¹
21.0 m¹
1.0 ls
1.0 ls
Rp -
Volume Har. Sat. Jumlah
85.0 m¹
25.0 m¹
7.0 m¹
29.0 m¹
8.0 m¹
8.0 bh
2.0 bh
4.0 bh
1.0 ls
1.0 ls
Rp -
Rp -
44.0 m¹
20.0 m¹
10.0 m¹
1.0 set
1.0 ls
1.0 ls
Rp -
44.0 m¹
20.0 m¹
10.0 m¹
1.0 ls
1.0 ls
Rp -
44.0 m¹
20.0 m¹
10.0 m¹
1.0 ls
1.0 ls
Rp -
44.0 m¹
20.0 m¹
10.0 m¹
1.0 ls
1.0 ls
Rp -
264.0 m¹
35.0 m¹
35.0 m¹
2.0 bh
Volume Har. Sat. Jumlah
1.0 ls
1.0 ls
Rp -
Rp -
Volume Har. Sat. Jumlah
12.0 tc
12.0 tc
12.0 bh
7.0 bh
5.0 bh
2.0 bh
1.0 bh
1.0 bh
1.0 bh
2.0 bh
1.0 bh
1.0 bh
1.0 bh
1.0 bh
5.0 bh
1.0 bh
1.0 bh
1.0 bh
1.0 bh
1.0 unit
20.0 m'
7.0 m'
6.0 m'
20.0 m'
32.0 m'
1.0 ls
8.0 m'
1.0 ls
1.0 ls
Rp -
Volume Har. Sat. Jumlah
2.0 tc
2.0 tc
set
2.0 bh
1.0 ls
10.0 tc
10.0 tc
3.0 set
7.0 set
10.0 bh
1.0 unit
1.0 ls
4.0 m'
1.0 ls
1.0 ls
Rp -
11.0 tc
11.0 tc
4.0 set
7.0 set
11.0 bh
1.0 unit
1.0 ls
3.0 m'
1.0 ls
1.0 ls
Rp -
Rp -
25.0 tc
Volume Har. Sat. Jumlah
1.0 unit
17.0 bh
2.0 bh
2.0 unit
2.0 bh
1.0 bh
2.0 bh
1.0 bh
1.0 ls
1.0 ls
Volume Har. Sat. Jumlah
25.0 tc
18.0 bh
2.0 bh
2.0 bh
2.0 bh
1.0 bh
2.0 bh
1.0 ls
1.0 ls
Rp -
24.0 tc
17.0 bh
2.0 bh
2.0 bh
2.0 bh
1.0 bh
2.0 bh
1.0 ls
1.0 ls
Rp -
23.0 tc
16.0 bh
2.0 bh
2.0 bh
2.0 bh
1.0 bh
2.0 bh
1.0 ls
1.0 ls
Rp -
Rp -
1.0 set
1.0 ls
Volume Har. Sat. Jumlah
Rp -
Volume Har. Sat. Jumlah
16.0 bh
5.0 bh
21.0 ttk
Rp -
18.0 bh
5.0 bh
21.0 ttk
Rp -
17.0 bh
5.0 bh
22.0 ttk
Rp -
16.0 bh
5.0 bh
21.0 ttk
Rp -
Rp -
6.0 tc
3.0 set
2.0 set
2.0 set
2.0 set
2.0 set
2.0 tc
11.0 tc
Volume Har. Sat. Jumlah
10.0 set
1.0 set
2.0 set
Rp -
Volume Har. Sat. Jumlah
2.0 tc
9.0 tc
2.0 set
2.0 set
2.0 set
2.0 set
1.0 set
2.0 set
Rp -
5.0 tc
6.0 tc
2.0 tc
2.0 tc
2.0 tc
1.0 tc
1.0 tc
1.0 tc
2.0 set
Rp -
1.0 lot
1.0 lot
Volume Har. Sat. Jumlah
1.0 lot
1.0 lot
Rp -
1.0 lot
1.0 lot
9.0 set
32.0 set
150.0 m'
570.0 m'
Rp -
Volume Har. Sat. Jumlah
Rp -
30.0 m¹
6.0 m¹
30.0 m¹
39.0 m¹
42.0 m¹
42.0 m¹
8.0 set
1.0 set
8.0 bh
4.0 set
1.0 set
Rp -
13.0 Unit
Volume Har. Sat. Jumlah
Rp -
Volume Har. Sat. Jumlah
13.0 unit
1.0 paket
1.0 unit
1.0 unit
13.0 titik
Rp -
1.0 unit
1.0 unit
Rp -
1.0 unit
Rp -
1.0 unit
Rp -
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER) UNPAD-PERTAMINA
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
Satuan HargaRp
Satuan (
No. Uraian Pekerjaan Vol )
SUBTOTAL - I
II PERALATAN PENDUKUNG
1 Lantai Satu
- 48 X 10/10/1000 base, 4x 10/100/1000 Base-X Combo Port ; 8.8 Gbps Switcing 1 Buah
Capacity ; 6.6 Mbps Forwarding Capacity ; MSA Compilance
- Patch Panel 24 Ports, Rj 45 Cat 6 2 node
- Acces Point Zoneflex Wireless dengan PoE 1 Unit
- UTP Patch Chord Cat 6, 3 Meter 34 Buah
- UTP Patch Chord Cat 6, 2 Meter 34 Buah
- Cable Management Cat 6 2 Buah
- 19" Wallmount Rack 12 U, Depth = 490 mm lengkap dengan fan 220 V (AC ) dan 4 1 Buah
Power Outlet
Satuan HargaRp
Satuan (
No. Uraian Pekerjaan Vol )
2 Lantai Dua
- 24 X 10/10/1000 base, 4x 10/100/1000 Base-X Combo Port ; 8.8 Gbps Switcing
1 Buah
Capacity ; 6.6 Mbps Forwarding Capacity ; MSA Compilance
- Acces Point Zoneflex Wireless dengan PoE 2 Unit
- Patch Panel 24 Ports, Rj 45 Cat 6 3 node
- UTP Patch Chord Cat 6, 3 meter 15 Buah
- UTP Patch Chord Cat 6, 2 meter 15 Buah
- Cable Management Cat 6 1 Buah
- 19" Wallmount Rack 12 U, Depth = 490 mm lengkap dengan fan 220 V (AC ) dan 6 1 Buah
Power Outlet
3 Lantai Tiga
- 48 X 10/10/1000 base, 4x 10/100/1000 Base-X Combo Port ; 8.8 Gbps Switcing 1 Buah
Capacity ; 6.6 Mbps Forwarding Capacity ; MSA Compilance
- Acces Point Zoneflex Wireless dengan PoE 2 Unit
- Patch Panel 24 Ports, Rj 45 Cat 6 4 node
- UTP Patch Chord Cat 6, 3 meter 34 Buah
- UTP Patch Chord Cat 6, 2 meter 34 Buah
- Cable Management Cat 6 2 Buah
- 19" Wallmount Rack 12 U, Depth = 490 mm lengkap dengan fan 220 V (AC ) dan 6 1 Buah
Power Outlet
4 Lantai Empat
- 48 X 10/10/1000 base, 4x 10/100/1000 Base-X Combo Port ; 8.8 Gbps Switcing 1 Buah
Capacity ; 6.6 Mbps Forwarding Capacity ; MSA Compilance
- 48 X 10/10/1000 base, 4x 10/100/1000 Base-X Combo Port ; 8.8 Gbps Switcing 1 Buah
Capacity ; 6.6 Mbps Forwarding Capacity ; MSA Compilance
- Acces Point Zoneflex Wireless dengan PoE 2 Unit
- Patch Panel 24 Ports, Rj 45 Cat 6 4 node
- UTP Patch Chord Cat 6, 3 meter 64 Buah
- UTP Patch Chord Cat 6, 2 meter 64 Buah
- Cable Management Cat 6 2 Buah
- 19" Wallmount Rack 12 U, Depth = 490 mm lengkap dengan fan 220 V (AC ) dan 6 1 Buah
Power Outlet
SUBTOTAL - II
III KABEL DISTRIBUSI & PENGETANAHAN
- Kabel BC 25 mm 50 m
- Cadweild or Crimped Connection 1 Buah
- Test link 1 Buah
SUBTOTAL - III
IV PEKERJAAN INSTALASI DATA
- Pekerjaan instalasi Data menggunakan jenis kable Standard Rj 45 CAT 6 UTP 4 pairs,
lengkap dengan Outlet Rj45 Category 6, konektor, Counduit, Kabel Ties, Klem, Plitser,
label dan Aksesoris lainnya
- Pekerjaan instalasi Rack Server dan Wallmount Rack, lengkap dengan wire
management dan Pelabelan
- Seluruh Pemasangan sudah termasuk inbowdoos dan upah pasang
1 Lantai Satu
Pekerjaan Instalasi
- Instalasi Data 30 Titik
- Instalasi Access point 1 Titik
- Instalasi Wallmount Rack 1 Titik
- Instalasi Data ( MainSwitch ke Switch Lantai ) 2 Titik
2 Lantai Dua
Pekerjaan Instalasi
- Instalasi Data 12 Titik
- Instalasi Access point 2 Titik
- Instalasi Wallmount Rack & Rack server 1 Titik
- Instalasi Data ( MainSwitch ke Switch Lantai ) 2 Titik
3 Lantai Tiga
Pekerjaan Instalasi
- Instalasi Data 40 Titik
- Instalasi Access point 2 Titik
- Instalasi Wallmount Rack 1 Titik
- Instalasi Data ( MainSwitch ke Switch Lantai ) 2 Titik
4 Lantai Empat
Pekerjaan Instalasi
- Instalasi Data 60 Titik
- Instalasi Access point 2 Titik
- Instalasi Wallmount Rack 1 Titik
- Instalasi Data ( MainSwitch ke Switch Lantai ) 4 Titik
SUBTOTAL - IV
V INSTALASI FIBER OPTIC
TOTAL
UNPAD-PERTAMINA
-
SubTotal Harga (Rp)
-
SubTotal Harga (Rp)
-
HARGA BAHAN DAN UPAH
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER) UNPAD
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
BAHAN2 KAYU
35 Kayu Jati Jateng tua lepas mata dia. 80 cm ke atas Rp.
No. Uraian Bahan Harg
36 Balok kayu Dolken Dia 8-10/400 cm Rp.
37 Balok kayu Kamper Banjar
8 x 12 x 400 balok Rp.
3 x 20 x 400 papan Rp.
2x10 cm papan
Klose Kayu kamper
38 Balok kayu Borneo
8 x 12 x 400 Rp.
6 x 12 x 400 Rp.
5 x 7 x 400 usuk Rp.
2 x 20 x 400 papan Rp.
3 x 30 x 400 papan Rp.
39 Kayu Terentang
3 x 30 x 400 Rp.
No. Uraian Bahan Harg
40 Triplek # 4 mm uk. 120 x 240 Rp.
41 Formika # 4 mm uk. 120 x 240 Rp.
42 Megateak # 4 mm uk. 120 x 240 Rp.
43 Multiplek # 9 mm uk. 120 x 240 Rp.
44 Multiplek # 12 mm uk. 120 x 240 Rp.
45 MDF board 9mm 120 x 220 Rp.
BAHAN-BAHAN SANITARI
180 Kran Leher Angsa 3/4"-1/2" Rp.
181 Kran 3/4"-1/2" Rp.
182 Kran Wastafel 3/4"-1/2" Rp.
183 Bak Cuci piring 1 lobang stainless steel komplit standard ( Sink ) Rp.
184 Bak Air Lapis Keramik Rp.
185 Tissue Holder Rp.
No. Uraian Bahan Harg
186 Seal Tape Rp.
186 Water Closet Rp.
187 Wastafel Bulat Rp.
188 Roof drain dia. 4" Rp.
189 Roof drain dia. 3" Rp.
190 Spoel hoeck Rp.
191 Soap Dish Rp.
192 Towel Bar Rp.
193 Jet Washer Rp.
194 Cove Lampu Di atas Wastafel ( tidak termasuk lampu ) Rp.
195 Shower Rp.
196 Shower Curtain Rp.
197 Shower Hand Rp.
198 Kran Shower Tray Rp.
No. Uraian Bahan Harg
199 Kran Rp.
200 Closet Duduk Rp.
201 Closet Jongkok Rp.
202 Urinoir Rp.
203 Sekat Porselen Urinoir Rp.
204 Floor Drain Rp.
BAHAN/PERALATAN PENUNJANG
261 Tie Rod Dia 16 lengkap ring & mur Rp.
262 Wall stud 64 mm Rp.
263 Wall track mead 64 Rp.
264 Cross Tee Rp.
265 Wall track bottom Rp.
266 Tempat memasak aspal Rp.
267 Scafolding - Main Frame MF 190 Rp.
268 Pipe Support (sewa) Rp.
269 Excavator 80 -140 Hp Rp.
270 Dump truck (Kap. 8 T) Rp.
271 Wheel loader 1.0 - 1.6 M3 Rp.
272 Aspalt Finisher Kap. 5,0 T Rp.
273 Tandem Roller Kap. 8,0 T Rp.
274 Tyre Roller Kap. 10,0 T Rp.
No. Uraian Bahan Harg
UPAH PEKERJA
1 Pekerja Rp.
2 Tukang kayu Rp.
3 Kepala Tukang kayu Rp.
4 Tukang batu Rp.
5 Kepala Tukang Batu Rp.
6 Tukang besi Rp.
7 Kepala tukang besi Rp.
8 Tukang cat Rp.
9 Kepala tukang cat Rp.
10 Tukang pipa Rp.
11 Kepala tukang pipa Rp.
12 Mandor Rp.
13 Mekanik Rp.
14 Operator Rp.
15 Pembantu Operator Rp.
16 Supir Truk Rp.
17 Kenek Truk Rp.
18 Penjaga Malam Rp.
HARGA BAHAN DAN UPAH
USAT PENGETAHUAN (KNOWLEDGE CENTER) UNPAD-PERTAMINA
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
Harga Satuan
per M3
per M3
per M3
per M3
per M3
per zak
per zak
per kg
per M3
per Kg
per Ton
per lbr
per Bh
per Bh
per Bh
per m3
per sak
per sak
per sak
per M3
per M3
per M3
per M3
per M3
per M3
per M3
per M3
per M3
per M3
per m2
per m2
per Kg
per Kg
per Kg
per m3
Harga Satuan
per btg
per m3
per m3
per m'
per bh
per m3
per m3
per m3
per m3
per m3
per m3
Harga Satuan
per Lbr
per Lbr
per Lbr
per Lbr
per Lbr
per Lb
per Kg
per Kg
per bh
per Kg
per Kg
per Kg
per M2
per M2
per Kg
per Bh
per bh.
per bh
per m2
per Lbr
per btg
per btg
per btg
per btg
per m2
per Lbr
per Ltr
per Ltr
per Ltr
per Ltr
per Ltr
per Kg
per Kg
per Kg
per Kg
per M2
per Kg
per kg
per kg
per kg
per kg
Harga Satuan
per kg
per kg
per kg
per Ltr
per Ltr
per zak
per kg
per Ltr
per Ltr
per bh
per kg
per kg
per m2
per m2
Harga Satuan
per m'
per m'
per m'
per m'
per m2
per m2
per M'
per M'
per m'
per M'
per m2
per lbr
per m2
per unit
per unit
per unit
per psg
per psg
per psg
per unit
per unit
per Bh
per set
per set
per psg
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per psg
per psg
Harga Satuan
per m2
per m2
per bh
per m2
per m2
per m2
per m2
per m2
per Bh
per m2
per m2
per Bh
per m2
Harga Satuan
per m2
per Bh
per Bh
per Bh
per m2
per Lb
per Lb
per lbr
per lbr
per M2
per M2
per M2
per M2
per M2
per M2
per bh
per Bh
per M3
per Lbr.
per Bh
per Lbr
per m'
per m2
per bh
per bh
per bh
per lbr
per m2
per m'
per m2
per m2
per m1
per m1
per buah
per buah
per buah
per unit
per buah
per buah
Harga Satuan
per buah
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
Harga Satuan
per Bh
per Bh
per Bh
per Bh
per Bh
per Bh
per m'
per m'
per m'
per m'
per m'
per m'
per m'
per m'
per m'
per m'
per kg
per m'
per m'
per m'
per m
per m
per m
per m
per m
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per bh
per m
per m
per m
per m
per m
per m
per m
Harga Satuan
per buah
per buah
per buah
per buah
per buah
per buah
per buah
per buah
per buah
per buah
per buah
per m
per m
per m
per buah
Harga Satuan
per buah
per buah
per buah
per bh
per set
per M'
per M'
per M'
per M'
per Unit
per Bh
per set
per Jam
per Jam
per Jam
per Jam
per Jam
per Jam
Harga Satuan
UPAH PEKERJA
Harga Satuan
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
per hari
Pekerjaan Panel Listrik
BILL OF QUANTITY (BOQ)
PEMBANGUNAN GEDUNG PUSAT PENGETAHUAN (KNOWLEDGE CENTER) UNPAD-PE
JL. DIPATI UKUR NO. 35 BANDUNG
(TAHUN ANGGARAN 2013 )
JUMLAH JUMLAH
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
NO. U R A I A N
I. UPAH PEKERJA
1 Pekerja
2 Tukang Listrik / Pipa / FA / AC
3 Kepala Tukang
4 Mandor
NO. U R A I A N
A. K A B E L
1 NYA 1,5 mm2 Setara Prima/ Eterna
2 NYA 2,5 mm2 Setara Prima/ Eterna
3 NYM 2x 2,5 mm2 Setara Prima/ Eterna
4 NYM 3x 2,5 mm2 Setara Prima/ Eterna
5 NYM 4x 2,5 mm2 Setara Prima/ Eterna
6 NYY 3x 2,5 mm2 Setara Prima/ Eterna
7 NYY 3x 4 mm2 Setara Prima/ Eterna
8 NYY 3x 6 mm2 Setara Prima/ Eterna
9 NYY 3x 10 mm2 Setara Prima/ Eterna
10 NYY 4x 2,5 mm2 Setara Prima/ Eterna
11 NYY 4x 4 mm2 Setara Prima/ Eterna
12 NYY 4x 6 mm2 Setara Prima/ Eterna
13 NYY 4x 10 mm2 Setara Prima/ Eterna
14 NYY 4x 16 mm2 Setara Prima/ Eterna
15 NYY 4x 25 mm2 Setara Supreme, Kabelmetal, Kabelindo
16 NYY 4x 35 mm2 Setara Supreme, Kabelmetal, Kabelindo
17 NYY 4x 50 mm2 Setara Supreme, Kabelmetal, Kabelindo
18 NYY 4x 70 mm2 Setara Supreme, Kabelmetal, Kabelindo
19 NYY 4x 95 mm2 Setara Supreme, Kabelmetal, Kabelindo
20 NYY 4x 120 mm2 Setara Supreme, Kabelmetal, Kabelindo
21 NYY 4x 150 mm2 Setara Supreme, Kabelmetal, Kabelindo
B. ARMATURE LAMPU
1 Armature T5.18 Setara Philips, TLD 18 W
2 Armature T5.28 Setara Philips, TLD 28 W
3 Armature RMI.218 Setara Philips, TLD 2x18 W
4 Armature RMI.318 Setara Philips, TLD 3x18 W
5 Armature RMI.136 Setara Philips, TLD 1x36 W
6 Armature RMI.236 Setara Philips, TLD 2x36 W
7 Armature V Shape.118 Setara Philips, TLD 1x18 W
8 Armature V Shape.218 Setara Philips, TLD 2x18 W
9 Armature V Shape.136 Setara Philips, TLD 1x36 W
10 Armature V Shape.236 Setara Philips, TLD 2x36 W
11 Armature GMS.118 Setara Philips, TLD 1x18 W
12 Armature GMS.136 Setara Philips, TLD 1x36 W
13 Armature Balk.118 Setara Philips, TLD 1x18 W
14 Armature Balk.136 Setara Philips, TLD 1x36 W
15 Armature DL.518 Setara Philips, Essensial 18 W
16 Armature Baret.SQ.ACR.20 Setara Philips, TLC 20 W
17 Armature Baret.SQ.ACR.32 Setara Philips, TLC 32 W
18 Armature Emergency Exit.108 Setara Philips/ Nicad, TLD 1x8 W
19 Armature Emergency Lamp.108 Setara Philips/ Nicad, TLD 1x8 W
20 Armature Taman BG.30.C Setara Philips, SL 18 W
21 Armature Roset Setara Philips, Pijar 25 W
22 Armature Wall Lamp Kipas Setara Philips, Ess. Warm White 25 W
23 Armature Gantung HDK.E40.H50 Setara Philips, HPLN 50 W
24 Armature Gantung HDK.E27.M250 Setara Philips, Mercury 250 W
25 Armature Spot Light.H300 Setara Philips, Halogen 300 W
26 Armature Spot Light.F1000 Setara Philips, Flood 1000 W
C. KOMPONEN PANEL
1 Pilot Lamp Telemecanique, Setara
2 Fuse Pilot Lamp Telemecanique, Setara
3 Selector Switch Telemecanique, Setara
4 Contactor 20 A Telemecanique, Setara
5 Amper Meter GAE, Setara
6 Volt Meter GAE, Setara
7 Current Traffo GAE, Setara
8 Time Switch Setara Theben, SUL 181
9 MCB 1 pole, 6 A - 20 A Setara MG, Domae, 4,5 KA
10 MCB 1 pole, 25 A Setara MG, Domae, 4,5 KA
11 MCB 3 pole, 6 A - 20 A Setara MG, Domae, 4,5 KA
12 MCB 3 pole, 25 A Setara MG, Domae, 4,5 KA
13 MCB 1 pole, 6 A - 20 A Setara MG, NC45N - 8 KA
14 MCB 1 pole, 25 A Setara MG, NC45N - 8 KA
13 MCB 3 pole, 6 A - 20 A Setara MG, NC45N - 8 KA
14 MCB 3 pole, 25 A Setara MG, NC45N - 8 KA
15 MCCB 3 pole, 15 A - 60 A Setara MG, EZC100F
16 MCCB 3 pole, 80 A Setara MG, EZC100F
17 MCCB 3 pole, 100 A Setara MG, EZC100F
18 MCCB 3 pole, 16 A - 100 A Setara MG, NS100N TM16-100D3P3T
19 MCCB 3 pole, 125 A Setara MG, NS160N TM125D3P3T
20 MCCB 3 pole, 160 A Setara MG, NS160N TM160D3P3T
21 MCCB 3 pole, 200 A - 250 A Setara MG, NS250N TM250D3P3T
22 MCCB 4 pole, 100 A - 250 A Setara MG, NS250N STR23SE4P4T
23 Motorized Setara MG, MT 250, 220/240V.AC
24 Change Over Setara MG, OF, SD, SDE & SDV
25 Voltage Release Setara MG, MN200/240VAC,50/60HZ,NS100
26 Relay 8 kaki Setara OMRON
E. TELEPHONE
1 Indoor Tel. Cable 2x2x0,6 mm2 Setara Prima/ Eterna/ Federal
2 Indoor Tel. Cable 10x2x0,6 mm2 Setara Prima/ Eterna/ Federal
3 Indoor Tel. Cable 20x2x0,6 mm2 Setara Prima/ Eterna/ Federal
4 Indoor Tel. Cable 40x2x0,6 mm2 Setara Supreme, Kabelmetal, Kabelindo
5 Indoor Tel. Cable 100x2x0,6 mm2 Setara Supreme, Kabelmetal, Kabelindo
6 Outlet Telephone Legrand, Valena, Setara
7 Single Line Telephone Setara LG, SLT-GS-5160
8 Digital Keyphone w/ 30 button Setara LG, LKD-30-D
9 Key Service Unit (6 slots) Setara LG, L100-KSU
10 Main Processor Board Setara LG, L100-MPBE
11 Program Module Unit ( 2 KSU ) Setara LG, L100-PMU2E
12 Link Module Unit Setara LG, L100-LCU
13 Ring Generator Unit Setara LG, D300-RGU
14 DTMF Receiver Unit Setara LG, D300-DTRU4
15 Analog Co Interface (4Co) Setara LG, D100-LCOB2
16 Analog Co Interface (8Co) Setara LG, D300-LCOB8
17 DKTU & SLT ports (6D+6S) Setara LG, D100-DSIB
18 Digital Term. Interface (12D) Setara LG, D100-DTIB12
19 SLT Interface bd (12slt) Setara LG, D300-SLIB2E
20 Main Distribution Frame Lokal
21 Ferro Resonant STBL (Stabilizer) Setara LG
22 Back-Up Power 8 Hours (External Battery) Setara LG
23 Panel Box Telephone Setara PBT
24 Sparring Kabel Setara Prima/ Eterna/ Federal
G. SOUND SYSTEM
1 Kabel NYMHY 3x1,5 mm2 Setara Supreme, Kabelmetal, Kabelindo
2 Ceilling Speaker Setara TOA, ZS-646-R
3 Attenuator 5 - 30 W Setara TOA, ZV-303
4 Horn Speaker 15 W Setara TOA, ZH-615-SM
5 Terminal Box Sound System Lokal
6 Sound System Merk TOA Full Set ( V Series )
H. C.C.T.V.
1 Kabel Signal, C5 Setara Supreme, Kabelmetal, Kabelindo
2 Kabel Power, NYYHY 3x1,5 sqmm Setara Supreme, Kabelmetal, Kabelindo
3 Camera, MDS 201 A Setara Tel View
4 Video Switcher, 16 ports Setara Tel View
5 Recorder, EDR Setara Tel View
6 TV Monitor, 29 " Setara Sony
7 Panel Power Komponen Setara MG
I. AIR CONDITIONING
1 Single Split AC Setara Daikin, 1 ph, 1 1/2 PK Type. R 35 - FT 35
2 Single Split AC Setara Daikin, 1 ph, 2 PK Type. R 50 - FT 50
3 Cassette AC Setara Daikin, 1 ph, 1 1/2 PK Type. R 35 - FHC 35 K
4 Cassette AC Setara Daikin, 1 ph, 2 PK Type. R 50 - FHC 50 K
5 Cassette AC Setara Daikin, 3 ph, 2 1/2 PK Type. R 60 - FHC 60 K
6 Cassette AC Setara Daikin, 3 ph, 3 PK Type. R 71 - FHC 71 K
7 Outlet AC 1 ph + Steker Legrand, Valena, Setara
8 Outlet AC 3 ph 16 A + Steker Legrand, Valena, Setara
9 Dudukan FCU & OCU - 1 phase
10 Dudukan FCU & OCU - 3 phase
K. LIFT
1 No. of Elevator L‐2 pasengger elevator
Capacity 10 Person (1000 kg)
Speed 60 mpm
Control System AC‐VVVF
Operation System Simplex Selective Collective
No. of Stop 5 stops/5 opening
Service floor Basement, 1 s/d 4
L. GENSET
1 Generating Set 150 KVA
SAT. HARGA
org/hari
org/hari
org/hari
org/hari
SAT. HARGA
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
set
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
btg
m'
m'
m'
m'
m'
m'
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
m'
bh
bh
bh
unit
unit
m'
m'
bh
bh
bh
bh
unit
set
set
set
set
set
set
set
set
set
set
unit
unit