ENGINER'S ESTIMATE (EE)
REKAPITULASI
PERKIRAAN KUANTITAS DAN HARGA

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH


KEGIATAN : PENGEMBANGAN
### SISTEM DISTRIBUSI AIR MINUM
PEKERJAAN : PEMBANGUNAN SPAM DESA HAMBAWUTANG DAN KAKAHA
LOKASI : DESA HAMBAWUTANG DAN KAKAHA - KEC. NGADUNGALA
TAHUN ANGGARA : 2019

JUMLAH
NO URAIAN PEKERJAAN HARGA
(Rp)
1 2 3

I PEKERJAAN PERSIAPAN 3,000,000.00

II KONSTRUKSI PEMASANGAN PIPA DISTRIBUSI


II.1 JALUR PIPA
A. JARINGAN PIPA DISTRIBUSI 623,729,251.02
B. BANGUNAN PERPIPAAN 275,861,983.32

III PEKERJAAN PENYELESAIAN AKHIR 6,500,000.00

A JUMLAH HARGA PEKERJAAN 909,091,234.34


B PAJAK PERTAMBAHAN NILAI (PPN) ( 10% x A ) 90,909,123.43
C TOTAL BIAYA PEKERJAAN 1,000,000,357.78
D TOTAL BIAYA PEKERJAAN DIBULATKAN 1,000,000,000.00

Terbilang :
Err:511

Waingapu, Mei 2019


Diperiksa dan Disetujui : Dibuat Oleh :
Kabid Cipta Karya dan Penataan Ruang Staf Teknik Dinas PU dan Penataan Ruang
Dinas PU dan Penataan Ruang Bidang Cipta Karya
Kabupaten Sumba Timur Kabupaten Sumba Timur

Ir. AMOS RAWAMBAKOE SEM NAMUDALA, A.MdT


Penata TK. I Nip. 19770906 201101 1 004
Nip. 19640407 2007011 024

Mengetahui
Kepala Dinas PU dan Penataan Ruang
Kabupaten Sumba Timur

YULIUS NGENJU, ST
Pembina
NIP. 19740428 200212 1 006
3

RENCANA ANGGARAN BIAYA


( RAB )

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH

KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM

PEKERJAAN : PEMBANGUNAN SPAM DESA HAMBAWUTANG DAN KAKAHA

LOKASI : DESA HAMBAWUTANG DAN KAKAHA - KEC. NGADUNGALA


TAHUN ANGGARA : 2019

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6

I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Ls 1.00 500,000.00 500,000.00
2 Pengukuran dan Perhitungan Kembali Jalur Pipa Ls 1.00 1,000,000.00 1,000,000.00
3 Mobilisasi dan Demobilisasi Ls 1.00 1,500,000.00 1,500,000.00

JUMLAH BAB I. PEKERJAAN PERSIAPAN 3,000,000.00

II KONSTRUKSI PEMASANGAN PIPA DISTRIBUSI


II.1 JALUR PIPA
A. JARINGAN PIPA DISTRIBUSI
1 .PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA HDPE DIA. 110 MM 19,672,746.12
a. Konstruksi Pemasangan Pipa dia. 110 mm
- Galian Tanah Biasa Manual M3 14.40 47,500.00 684,000.00
- Urugan Tanah Kembali M3 13.26 34,000.00 450,846.12
- Penyambungan / Pemasangan Pipa dia. 110 mm M' 120.00 153,120.00 18,374,400.00
b. Pemasangan Aksesories Pipa dia. 110 mm
- Reducer PE dia. 110 x 90 mm Bh 1.00 163,500.00 163,500.00

2 .PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA HDPE DIA. 90 MM 293,040,058.60


a. Konstruksi Pemasangan Pipa dia. 90 mm
- Galian Tanah Biasa Manual M3 227.50 47,500.00 10,806,250.00
- Urugan Tanah Kembali M3 210.97 34,000.00 7,172,908.60
- Penyambungan / Pemasangan Pipa dia. 90 mm M' 2,600.00 103,820.00 269,932,000.00
b. Pemasangan Aksesories Pipa dia. 90 mm
- Reducer PE dia. 90 x 63 mm Bh 1.00 101,900.00 101,900.00
- Coupler dia. 90 mm Bh 10.00 502,700.00 5,027,000.00

3 .PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA HDPE DIA. 63 MM 127,620,721.30


a. Konstruksi Pemasangan Pipa dia. 63 mm
- Galian Tanah Biasa Manual M3 135.00 47,500.00 6,412,500.00
- Urugan Tanah Kembali M3 129.39 34,000.00 4,399,321.30
- Penyambungan / Pemasangan Pipa dia. 63 mm M' 1,800.00 63,335.00 114,003,000.00
b. Pemasangan Aksesories Pipa HDPE dan GIP dia. 63 mm
- Reducer PE dia. 63 x 50 mm Bh 1.00 55,000.00 55,000.00
- Tee dia. 63 x 50 mm Bh 2.00 205,700.00 411,400.00
- End Cap dia 63 mm Bh 1.00 183,500.00 183,500.00
- Coupler dia. 63 mm Bh 10.00 215,600.00 2,156,000.00

4 .PEKERJAAN PENGADAAN DAN PEMASANGAN PIPA HDPE DIA. 50 MM 144,842,725.00


a. Konstruksi Pemasangan Pipa dia. 50 mm
- Galian Tanah Biasa Manual M3 225.00 47,500.00 10,687,500.00
- Urugan Tanah Kembali M3 219.11 34,000.00 7,449,825.00
- Penyambungan / Pemasangan Pipa dia. 50 mm M' 3,000.00 41,335.00 124,005,000.00
b. Pemasangan Aksesories Pipa HDPE dan GIP dia. 50 mm
- End Cap dia. 50 mm Bh 3.00 171,200.00 513,600.00
- Coupler dia. 50 mm Bh 14.00 156,200.00 2,186,800.00

4 .Biaya Transportasi (Inland Cost) 38,553,000.00


- Biaya Transportasi Pipa dari (Srby - Wgp dan Wgp - Lokasi) Ls 1.00 38,553,000.00 38,553,000.00

JUMLAH A. JARINGAN PIPA DISTRIBUSI 623,729,251.02

B. BANGUNAN PERPIPAAN
1. PEKERJAAN PEMBANGUNAN BRONKAPTERING V = 8 M3 91,378,976.42
a. Pek. Pengalihan Air
- Pengalihan Air Ls 1.00 750,000.00 750,000.00

b. Pek. Tanah/Urugan (Bangunan Penangkap dan Bak)


- Galian Tanah Biasa Manual M3 11.25 47,500.00 534,280.00
- Urugan tanah kembali M3 2.81 34,000.00 95,608.00

c. Pek. Pasangan dan Plesteran (Bangunan Penangkap dan Bak)


- Pasangan Batu 1Pc : 3Psr M3 4.05 1,123,362.00 4,549,616.10
- Plesteran 1Pc : 2Psr M2 58.85 58,343.70 3,433,526.98
4

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
- Acian M2 58.85 25,999.50 1,530,070.58

d. Pekerjaan Saluran Pembawa


- Pasangan Batu 1Pc : 3Psr M3 6.30 1,123,362.00 7,077,180.60
- Plesteran 1Pc : 2Psr M2 24.00 58,343.70 1,400,248.90
- Acian M2 24.00 25,999.50 623,988.00
- Pek. Rabat Beton Lantai Saluran 1 Pc : 3 Psr : 5 krl M3 0.32 1,331,044.42 419,278.99
5

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
- Pek. Penutup Saluran Beton Bertulang :
# Beton Mutu K175 M3 1.35 1,475,371.08 1,991,750.95
# Pembesian Ø 10 mm (tulangan tunggal) Kg 86.38 18,592.50 1,606,020.15
# Bakisting M2 16.50 419,805.00 6,926,782.50

e. Pekerjaan Beton Bertulang/Tdk Bertulang


□ Bak Penampung Bronkaptering
□ Lantai Kerja t = 20 cm
- Beton Mutu K100 M3 0.58 1,331,044.42 766,681.58
- Bakisting M2 0.88 419,805.00 369,428.40

□ Plat Dasar t = 20 cm
- Beton Mutu K175 M3 1.15 1,475,371.08 1,699,627.48
- Pembesian Ø 10 mm (tulangan rangkap) Kg 107.83 18,592.50 2,004,772.01
- Bakisting M2 1.92 419,805.00 806,025.60

□ Plat Atas t = 10 cm
- Beton Mutu K175 M3 0.14 1,475,371.08 212,453.43
- Pembesian Ø 10 mm (tulangan rangkap) Kg 95.73 18,592.50 1,779,929.19
- Bakisting M2 1.92 419,805.00 806,025.60

□ Plat Dinding t = 20 cm
- Beton Mutu K175 M3 3.52 1,475,371.08 5,193,306.19
- Pembesian Ø 10 mm (tulangan rangkap) Kg 390.29 18,592.50 7,256,457.90
- Bakisting M2 35.20 365,305.00 12,858,736.00

□ Pembuatan dan Pemasangan Men Hole 60 x 60 cm (2 Buah) M3 0.05 1,475,371.08 74,358.70

□ Bak Gate Valve Bronkaptering


□ Lantai Kerja t = 20 cm
- Beton Mutu K100 M3 0.23 1,331,044.42 311,464.39
- Bakisting M2 1.12 419,805.00 470,181.60

□ Plat Dasar t = 20 cm
- Beton Mutu K175 M3 0.47 1,475,371.08 690,473.66
- Pembesian Ø 10 mm (tulangan rangkap) Kg 45.46 18,592.50 845,225.46
- Bakisting M2 1.24 419,805.00 520,558.20

□ Plat Atas t = 10 cm
- Beton Mutu K175 M3 0.21 1,475,371.08 308,057.48
- Pembesian Ø 10 mm (tulangan rangkap) Kg 38.80 18,592.50 721,332.48
- Bakisting M2 2.96 419,805.00 1,242,622.80

□ Plat Dinding t = 20 cm
- Beton Mutu K175 M3 0.59 1,475,371.08 874,157.36
- Pembesian Ø 10 mm (tulangan rangkap) Kg 96.79 18,592.50 1,799,660.29
- Bakisting M2 7.90 365,305.00 2,885,909.50

□ Pembuatan dan Pemasangan Men Hole 60 x 60 cm (1 Buah) M3 0.03 1,475,371.08 37,179.35

f. Pengad. & Pemas. Aksesories


- Pipa GIP dia. 100 mm M' 12.00 426,800.00 5,121,600.00
- Gate Valve All Flange dia. 100 mm Bh 2.00 1,269,000.00 2,538,000.00
- Bend All Flange 90" dia. 100 mm Bh 1.00 418,000.00 418,000.00
- Tee All Flange dia 100 x 100 mm Bh 1.00 507,300.00 507,300.00
- Flange GIP dia. 100 mm Bh 10.00 444,000.00 4,440,000.00
- Flange HDPE dia. 110 mm Bh 1.00 444,000.00 444,000.00
- Packing Karet dia. 100 mm Bh 11.00 16,500.00 181,500.00
- Baut + Mur 12 mm Bh 44.00 13,200.00 580,800.00
- Stub End dia. 110 mm Bh 1.00 217,800.00 217,800.00
- Wall Pipe dia. 100 mm Bh 3.00 242,000.00 726,000.00
- Screen dia. 100 mm Bh 1.00 231,000.00 231,000.00
- Pembuatan Tangga masuk (besi dia. 12 mm) Unit 2.00 250,000.00 500,000.00

2. PEKERJAAN PEMBANGUNAN RESERVOIR V= 50 M3 145,537,048.91


a. Pek. Tanah/Urugan
- Galian Tanah Biasa Manual M3 14.79 47,500.00 702,715.00
- Urugan tanah kembali M3 1.18 34,000.00 39,984.00

b. Pek. Pasangan dan Plesteran


- Plesteran 1Pc : 2Psr M2 132.06 58,343.70 7,705,015.41
- Acian M2 132.06 25,999.50 3,433,558.97

c. Pekerjaan Beton Bertulang/Tdk Bertulang


□ Bak Penampung Reservoir
□ Lantai Kerja t = 20 cm
- Beton Mutu K100 M3 2.92 1,331,044.42 3,881,325.52
6

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
- Bakisting M2 2.16 419,805.00 906,778.80
7

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
□ Plat Dasar t = 20 cm
- Beton Mutu K175 M3 5.83 1,475,371.08 8,604,364.11
- Pembesian Ø 10 mm (tulangan rangkap) Kg 508.63 18,592.50 9,456,705.51
- Bakisting M2 4.32 419,805.00 1,813,557.60

□ Plat Atas t = 10 cm
- Beton Mutu K175 M3 1.76 1,475,371.08 2,602,554.58
- Pembesian Ø 10 mm (tulangan rangkap) Kg 491.60 18,592.50 9,140,090.11
- Bakisting M2 19.32 419,805.00 8,110,632.60

□ Plat Dinding t = 20 cm
- Beton Mutu K175 M3 8.32 1,475,371.08 12,275,087.35
- Pembesian Ø 10 mm (tulangan rangkap) Kg 831.57 18,592.50 15,460,926.55
- Bakisting M2 83.20 365,305.00 30,393,376.00

□ Balok Beton 20 x 20 cm
- Beton Mutu K175 M3 0.42 1,475,371.08 613,754.37
- Pembesian Ø 10 mm Kg 48.31 18,592.50 898,162.03
- Bakisting M2 6.24 373,083.00 2,328,037.92

□ Pembuatan dan Pemasangan Men Hole 60 x 60 cm (2 Buah) M3 0.05 1,475,371.08 74,358.70

□ Bak Gate Valve Reservoir


□ Lantai Kerja t = 20 cm
- Beton Mutu K100 M3 0.53 1,331,044.42 704,122.50
- Bakisting M2 0.92 419,805.00 386,220.60

□ Plat Dasar t = 20 cm
- Beton Mutu K175 M3 1.06 1,475,371.08 1,560,942.60
- Pembesian Ø 10 mm (tulangan rangkap) Kg 97.54 18,592.50 1,813,426.18
- Bakisting M2 1.38 419,805.00 579,330.90

□ Plat Atas t = 10 cm
- Beton Mutu K175 M3 0.29 1,475,371.08 426,382.24
- Pembesian Ø 10 mm (tulangan rangkap) Kg 89.64 18,592.50 1,666,590.05
- Bakisting M2 3.57 419,805.00 1,498,703.85

□ Plat Dinding t = 20 cm
- Beton Mutu K175 M3 0.97 1,475,371.08 1,427,421.52
- Pembesian Ø 10 mm (tulangan rangkap) Kg 146.08 18,592.50 2,716,009.51
- Bakisting M2 12.90 365,305.00 4,712,434.50

□ Pembuatan dan Pemasangan Men Hole 60 x 60 cm (1 Buah) M3 0.03 1,475,371.08 37,179.35

d. Pengad. & Pemas. Aksesories


- Pipa GIP dia. 40 mm M' 6.00 165,000.00 990,000.00
- Pipa GIP dia. 75 mm M' 6.00 294,800.00 1,768,800.00
- Gate Valve All Flange dia. 40 mm (Untuk Pipa GIP 1,5") Bh 1.00 742,500.00 742,500.00
- Gate Valve All Flange dia. 75 mm (Untuk Pipa GIP 3") Bh 2.00 962,500.00 1,925,000.00
- Bend All Flange 90" dia. 75 mm Bh 2.00 335,500.00 671,000.00
- Tee All Flange dia 75 x 75 mm Bh 1.00 328,600.00 328,600.00
- Flange dia. 50 mm Bh 2.00 177,800.00 355,600.00
- Flange GIP dia. 75 mm Bh 1.00 290,400.00 290,400.00
- Flange HDPE dia. 90 mm Bh 1.00 290,400.00 290,400.00
- Packing Karet dia. 50 mm Bh 2.00 11,000.00 22,000.00
- Packing Karet dia. 75 mm Bh 10.00 16,500.00 165,000.00
- Baut + Mur 12 mm Bh 48.00 13,200.00 633,600.00
- Stub End dia. 50 mm Bh 1.00 104,500.00 104,500.00
- Stub End dia. 90 mm Bh 1.00 174,900.00 174,900.00
- Wall Pipe dia. 50 mm Bh 1.00 126,500.00 126,500.00
- Wall Pipe dia. 75 mm Bh 1.00 165,000.00 165,000.00
- Screen dia. 50 mm Bh 1.00 132,000.00 132,000.00
- Screen dia. 75 mm Bh 1.00 181,500.00 181,500.00
- Pembuatan Tangga masuk (besi dia. 12 mm) Unit 2.00 250,000.00 500,000.00

3. Bak Pengaman Air Valve ( 1 Unit ) dan Aksesoriesnya 4,249,736.45


a. Pekerjaan Tanah/Urugan
- Galian Tanah Biasa Manual M3 0.36 47,500.00 17,242.50
- Urugan Tanah Kembali M3 0.09 34,000.00 2,992.00

b. Pekerjaan Beton Bertulang


1. Plat Lantai t = 10 cm
- Beton Mutu K175 M3 0.12 1,475,371.08 178,519.90
- Pembesian Ø 10 mm (tulangan tunggal) Kg 14.10 18,592.50 262,240.15
- Bakisting M2 0.44 419,805.00 184,714.20

2. Plat Dinding t = 10 cm
- Beton Mutu K175 M3 0.22 1,475,371.08 318,680.15
8

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
- Pembesian Ø 10 mm (tulangan tunggal) Kg 24.78 18,592.50 460,698.35
- Bakisting M2 4.80 365,305.00 1,753,464.00
9

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6

3. Pembuatan dan Pemasangan Man Hole uk. 100 x 100 cm


- Beton Mutu K175 M3 0.10 1,475,371.08 147,537.11
- Pembesian Ø 10 mm (tulangan tunggal) Kg 8.98 18,592.50 167,026.10
- Bakisting M2 0.40 365,305.00 146,122.00

c. Pengad. & Pemas. Aksesories


□ Aksesories Air Valve Pipa Induk dia. 90 mm (1 Unit )
- Clamp Sadle dia. 90 x 25 mm Bh 1.00 115,500.00 115,500.00
- Air Valve dia. 25 mm Bh 1.00 495,000.00 495,000.00

3. Bak Pengaman Wash Out ( 3 Unit ) dan Aksesoriesnya 20,370,009.36


a. Pekerjaan Tanah/Urugan
- Galian Tanah Biasa Manual M3 1.09 47,500.00 51,727.50
- Urugan Tanah Kembali M3 0.26 34,000.00 8,976.00

b. Pekerjaan Beton Bertulang


1. Plat Lantai t = 10 cm
- Beton Mutu K175 M3 0.36 1,475,371.08 535,559.70
- Pembesian Ø 10 mm (tulangan tunggal) Kg 42.31 18,592.50 786,720.44
- Bakisting M2 1.32 419,805.00 554,142.60

2. Plat Dinding t = 10 cm
- Beton Mutu K175 M3 0.65 1,475,371.08 956,040.46
- Pembesian Ø 10 mm (tulangan tunggal) Kg 74.34 18,592.50 1,382,095.05
- Bakisting M2 14.40 365,305.00 5,260,392.00

3. Pembuatan dan Pemasangan Man Hole uk. 100 x 100 cm


- Beton Mutu K175 M3 0.30 1,475,371.08 442,611.32
- Pembesian Ø 10 mm (tulangan tunggal) Kg 26.95 18,592.50 501,078.29
- Bakisting M2 1.20 365,305.00 438,366.00

c. Pengad. & Pemas. Aksesories


1. Aksesories Wash Out Pipa Induk dia. 90 mm (1 Unit )
- Gate Valve All Flange dia. 90 mm Bh 2.00 962,500.00 1,925,000.00
- Tee All Flange dia. 90 x 90 mm Bh 1.00 328,600.00 328,600.00
- Flange dia. 90 mm Bh 3.00 290,400.00 871,200.00
- Packing Karet dia. 90 mm Bh 3.00 16,500.00 49,500.00
- Baut + Mur 12 mm Bh 12.00 13,200.00 158,400.00
- Stub End dia. 90 mm Bh 3.00 174,900.00 524,700.00

2. Aksesories Wash Out Pipa Induk dia. 63 mm (1 Unit )


- Gate Valve All Flange dia. 63 mm Bh 2.00 825,000.00 1,650,000.00
- Tee All Flange dia. 63 x 63 mm Bh 1.00 104,200.00 104,200.00
- Flange dia. 63 mm Bh 3.00 177,800.00 533,400.00
- Packing Karet dia. 63 mm Bh 3.00 11,000.00 33,000.00
- Baut + Mur 12 mm Bh 12.00 13,200.00 158,400.00
- Stub End dia. 63 mm Bh 3.00 107,800.00 323,400.00

3. Aksesories Wash Out Pipa Induk dia. 50 mm (1 Unit )


- Gate Valve All Flange dia. 50 mm Bh 2.00 825,000.00 1,650,000.00
- Tee All Flange dia. 50 x 50 mm Bh 1.00 104,200.00 104,200.00
- Flange dia. 50 mm Bh 3.00 177,800.00 533,400.00
- Packing Karet dia. 50 mm Bh 3.00 11,000.00 33,000.00
- Baut + Mur 12 mm Bh 12.00 13,200.00 158,400.00
- Stub End dia. 50 mm Bh 3.00 104,500.00 313,500.00

4. Pek. Pengadaan & Pemasangan Tugu Kran ( 15 Unit ) 14,326,212.18


a. Pek. Pemasangan Kran Umum
- Galian Tanah Biasa Manual M3 3.31 47,500.00 157,106.25
- Rabat Beton 1 Pc : 3 Psr : 5 krl M3 2.81 1,331,044.42 3,743,562.43
- Beton Tumbuk 1 Pc : 2 Psr : 3 krl M3 0.94 1,475,371.08 1,383,160.38
- Plesteran 1 Pc : 3 Psr M2 26.06 55,895.30 1,456,771.15
- Acian M2 26.06 25,999.50 677,611.97
b. Pek. Pengadaan Accesories Kran Umum
- Pipa GIP dia. 15 mm ( 1/2 Inch ) M 90.00 43,800.00 3,942,000.00
- Knie dia. 15 mm - 90" Bh 30.00 7,100.00 213,000.00
- Nepel dia. 15 mm Bh 30.00 8,800.00 264,000.00
- Clamp Sadle dia. 63 x 15 mm Bh 5.00 68,700.00 343,500.00
- Clamp Sadle dia. 50 x 15 mm Bh 10.00 57,200.00 572,000.00
- Watermoer dia. 15 mm Bh 15.00 22,500.00 337,500.00
- Socket dia. 15 mm Bh 15.00 5,500.00 82,500.00
- Stop Kran 15 mm Bh 15.00 45,600.00 684,000.00
- Kran Ball Valve 15 mm Bh 15.00 31,300.00 469,500.00

JUMLAH B. BANGUNAN PERPIPAAN 275,861,983.32


JUMLAH SUB BAB II.1 JALUR PIPA ( A + B ) 899,591,234.34
JUMLAH BAB II. KONSTRUKSI PEMASANGAN PIPA DISTRIBUSI (II.1) 899,591,234.34
10

HARGA JUMLAH
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA
(Rp) (Rp)
1 2 3 4 5 6
III PEKERJAAN PENYELESAIAN AKHIR
1. Pembersihan Kembali Lokasi Pekerjaan Ls 1.00 500,000.00 500,000.00
2. Pelaporan, Dokumentasi dan As Built Drawing Ls 1.00 6,000,000.00 6,000,000.00

JUMLAH BAB III. PEKERJAAN PENYELESAIAN AKHIR 6,500,000.00


DAFTAR HARGA SATUAN UPAH DAN BAHAN

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH


KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM
PEKERJAAN : PEMBANGUNAN SPAM DESA HAMBAWUTANG DAN KAKAHA
LOKASI : DESA HAMBAWUTANG DAN KAKAHA - KEC. NGADUNGALA
TAHUN ANGGARAN : 2019

A. HARGA SATUAN UPAH

HARGA SATUAN
No URAIAN SATUAN
(Rp)
1 2 3 4
1 Mandor Org/Hari 70,000.00
2 Kepala Tukang Org/Hari 75,000.00
3 Tukang Cat Org/Hari 70,000.00
4 Tukang Batu Org/Hari 70,000.00
5 Tukang Kayu Org/Hari 70,000.00
6 Tukang Besi Org/Hari 70,000.00
7 Tukang Pipa Org/Hari 70,000.00
8 Pekerja Org/Hari 61,000.00

B. HARGA SATUAN BAHAN BANGUNAN

HARGA SATUAN
No URAIAN SATUAN
(Rp)
1 2 3 4
1 Batu Gunung / Quarry M3 317,000.00
2 Batu Belah M3 317,000.00
3 Kerikil (Maks 30 mm) M3 680,000.00
4 Batu Pecah 2 - 3 cm M3 997,000.00
5 Pasir Urug M3 499,000.00
6 Pasir Pasang M3 527,000.00
7 Pasir Beton M3 527,000.00
8 Semen Porland Kg 1,646.00
9 Paku 5 – 10 cm Kg 19,500.00
10 Paku 5 – 12 cm Kg 19,500.00
11 Besi beton (polos/ulir) Kg 16,400.00
12 Air Liter 30.55
13 Kawat Beton Kg 25,000.00
14 Kawat Ikat Kg 25,000.00
15 Besi L 30 x 30 x 3 mm Kg 24,000.00
16 Plat Baja t = 2 mm Lbr 1,139,000.00
17 Engsel Besi Bh 35,000.00
18 Gembok Bh 55,000.00
19 Usuk 5/7 Cm Kelas II M3 4,128,000.00
20 Papan 2/20 Kelas II M3 4,428,000.00
21 Kayu kelas III M3 3,163,000.00
22 Kayu Balok kelas II M3 4,426,000.00
23 Kayu Bekisting M3 2,531,000.00
24 Tripleks 6 mm Lbr 102,000.00
25 Multipleks 9 mm Lbr 165,000.00
26 Dolken kayu φ 8-10/400 cm Batang 15,000.00
27 Minyak Begesting Ltr 16,000.00
28 Cat opux/resin (Belmas) Kg 20,000.00
HARGA SATUAN
No URAIAN SATUAN
(Rp)
1 2 3 4
C. HARGA SATUAN PIPA DAN AKSESORIES 11

HARGA SATUAN
No URAIAN SATUAN
(Rp)
1 2 3 4
I HIGH DENSITY POLYETHYLENE (HDPE)
1 Pipa HDPE dia. 160 mm ( 6 Inch ) M' 312,100.00
2 Pipa HDPE dia. 110 mm ( 4 Inch ) M' 149,000.00
3 Pipa HDPE dia. 90 mm ( 3 Inch ) M' 99,700.00
4 Pipa HDPE dia. 63 mm ( 2 Inch ) M' 59,800.00
5 Pipa HDPE dia. 50 mm ( 1.5 Inch ) M' 37,800.00
HARGA SATUAN
No URAIAN SATUAN
(Rp)
1 2 3 4
II GALVANIZED IRON PIPE ( GIP )
1 Pipa GIP dia. 150 mm ( 6 Inch ) M' 683,800.00
2 Pipa GIP dia. 100 mm ( 4 Inch ) M' 426,800.00
3 Pipa GIP dia. 75 mm ( 3 Inch ) M' 294,800.00
4 Pipa GIP dia. 50 mm ( 2 Inch ) M' 178,900.00
5 Pipa GIP dia. 40 mm ( 1.5 Inch ) M' 165,000.00
6 Pipa GIP dia. 15 mm ( 1/2 Inch ) M' 43,800.00

III ACCESSORIES PIPA HDPE DAN GIP


1 Air Valve dia. 50 mm Bh 495,000.00
2 Air Valve dia. 25 mm Bh 495,000.00
3 Bend All Flange 90'' dia. 100 mm Bh 418,000.00
4 Bend All Flange 90'' dia. 75 mm Bh 335,500.00
5 Bend All Flange 90'' dia. 50 mm Bh 322,300.00
6 Bend 90'' dia. 63 mm Bh 221,900.00
7 End Cap dia. 90 mm Bh 354,600.00
8 End Cap dia. 63 mm Bh 183,500.00
9 End Cap dia. 50 mm Bh 171,200.00
10 Clamp Sadle dia. 90 x 25 mm Bh 115,500.00
11 Clamp Sadle dia. 90 x 15 mm Bh 104,700.00
12 Clamp Sadle dia. 63 x 15 mm Bh 68,700.00
13 Clamp Sadle dia. 50 x 15 mm Bh 57,200.00
14 Coupler dia. 90 mm Bh 502,700.00
15 Coupler dia. 63 mm Bh 215,600.00
16 Coupler dia. 50 mm Bh 156,200.00
17 Gate Valve All Flange dia. 150 mm Bh 4,950,000.00
18 Gate Valve All Flange dia. 100 mm Bh 1,269,000.00
19 Gate Valve All Flange dia. 75 mm Bh 962,500.00
20 Gate Valve All Flange dia. 40 mm Bh 742,500.00
21 Gate Valve All Flange dia. 50 mm Bh 825,000.00
22 Gate Valve All Flange dia. 110 mm Bh 1,269,000.00
23 Gate Valve All Flange dia. 90 mm Bh 962,500.00
24 Gate Valve All Flange dia. 63 mm Bh 825,000.00
25 Packing Karet dia. 150 mm Bh 22,000.00
26 Packing Karet dia. 100 mm Bh 19,800.00
27 Packing Karet dia. 75 mm Bh 16,500.00
28 Packing Karet dia. 50 mm Bh 11,000.00
29 Packing Karet dia. 160 mm Bh 22,000.00
30 Packing Karet dia. 110 mm Bh 19,800.00
31 Packing Karet dia. 90 mm Bh 16,500.00
32 Packing Karet dia. 63 mm Bh 11,000.00
33 Baut + Mur 12 mm Bh 13,200.00
34 Tee All Flange dia. 150 x 150 mm Bh 642,300.00
35 Tee All Flange dia. 100 x 100 mm Bh 507,300.00
36 Tee All Flange dia. 75 x 75 mm Bh 328,600.00
37 Tee All Flange dia. 50 x 50 mm Bh 104,200.00
38 Tee All Flange dia. 40 x 40 mm Bh 88,000.00
39 Tee All Flange dia. 110 x 110 mm Bh 507,300.00
40 Tee All Flange dia. 90 x 90 mm Bh 328,600.00
41 Tee All Flange dia. 63 x 63 mm Bh 104,200.00
42 Tee All Flange dia. 90 x 63 mm Bh 302,500.00
43 Tee All Flange dia. 63 x 63 mm Bh 104,200.00
43 Tee All Flange dia. 90 x 25 mm Bh 302,500.00
HARGA SATUAN
No URAIAN SATUAN
(Rp)
1 2 3 4
44 Tee All Flange dia. 63 x 25 mm Bh 104,200.00
45 Tee dia. 90 x 90 mm Bh 715,000.00
46 Tee dia. 90 x 63 mm Bh 694,100.00
47 Tee dia. 63 x 50 mm Bh 205,700.00
48 Tee dia. 50 x 50 mm Bh 181,500.00
49 Flange dia. 150 mm Bh 684,800.00
50 Flange dia. 100 mm Bh 444,000.00
51 Flange dia. 75 mm Bh 290,400.00
52 Flange dia. 50 mm Bh 177,800.00
53 Flange dia. 160 mm Bh 684,800.00
54 Flange dia. 110 mm Bh 444,000.00
55 Flange dia. 90 mm Bh 290,400.00
56 Flange dia. 63 mm Bh 177,800.00
57 Reducer dia. 160 x 110 mm Bh 475,800.00
58 Reducer dia. 110 x 90 mm Bh 163,500.00
59 Reducer dia. 90 x 63 mm Bh 101,900.00
60 Reducer dia. 63 x 50 mm Bh 55,000.00
61 Dop dia. 63 mm Bh 11,500.00
62 Dop dia. 50 mm Bh 11,500.00
63 Stub End dia. 160 mm Bh 395,900.00
64 Stub End dia. 110 mm Bh 217,800.00
65 Stub End dia. 90 mm Bh 174,900.00
66 Stub End dia. 63 mm Bh 107,800.00
67 Stub End dia. 50 mm Bh 104,500.00
68 Screen dia. 150 mm Bh 275,000.00
HARGA SATUAN
No URAIAN SATUAN
(Rp)
1 2 3 4
69 Screen dia. 100 mm Bh 231,000.00
70 Screen dia. 75 mm Bh 181,500.00
71 Screen dia. 50 mm Bh 132,000.00
72 Wall Pipe dia. 150 mm Bh 286,000.00
73 Wall Pipe dia. 100 mm Bh 242,000.00
74 Wall Pipe dia. 75 mm Bh 165,000.00
75 Wall Pipe dia. 50 mm Bh 126,500.00
76 Watermoer dia. 15 mm Bh 22,500.00
77 Knie dia. 15 mm - 90" Bh 7,100.00
78 Nepel dia. 15 mm Bh 8,800.00
79 Socket dia. 15 mm Bh 5,500.00
80 Stop Kran dia. 15 mm Bh 45,600.00
81 Kran Ball Valve dia. 15 mm Bh 31,300.00
82 Water Meter dia. 15 mm Bh 495,000.00
16 Analisa SNI - Sipil

ANALISA HARGA SATUAN GEDUNG

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH


KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM
PEKERJAAN : PEMBANGUNAN SPAM DESA HAMBAWUTANG DAN KAKAHA
LOKASI : DESA HAMBAWUTANG DAN KAKAHA - KEC. NGADUNGALA
TAHUN ANGGARAN : 2019

HARGA SATUAN PEKERJAAN TANAH

Penggalian 1 m3 tanah biasa sedalam 1 m


Harga Satuan : Rp. 47,500.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.750 61,000.00 45,750.00
Mandor L.04 OH 0.025 70,000.00 1,750.00
JUMLAH TENAGA KERJA 47,500.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 47,500.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 47,500.00

Penggalian 1 m3 tanah keras sedalam 1 m


Harga Satuan : Rp. 63,240.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 1.000 61,000.00 61,000.00
Mandor L.04 OH 0.032 70,000.00 2,240.00
JUMLAH TENAGA KERJA 63,240.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 63,240.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 63,240.00

Pengurugan kembali 1 m3 galian tanah


Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Harga Satuan : Rp. 34,000.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.500 61,000.00 30,500.00
Mandor L.04 OH 0.050 70,000.00 3,500.00
17 Analisa SNI - Sipil

JUMLAH TENAGA KERJA 34,000.00


B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 34,000.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 34,000.00
18 Analisa SNI - Sipil

Pengurugan 1 m3 dengan pasir urug


Harga Satuan : Rp. 617,800.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 61,000.00 18,300.00
Mandor L.04 OH 0.010 70,000.00 700.00
JUMLAH TENAGA KERJA 19,000.00
B. BAHAN
Pasir urug m3 1.200 499,000.00 598,800.00
JUMLAH HARGA BAHAN 598,800.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 617,800.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 617,800.00

HARGA SATUAN PEKERJAAN PONDASI

Pemasangan 1 m3 batu kosong (anstamping)


Harga Satuan : Rp. 676,503.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.780 61,000.00 47,580.00
Tukang Batu L.02 OH 0.390 70,000.00 27,300.00
Kepala Tukang L.03 OH 0.039 75,000.00 2,925.00
Mandor L.04 OH 0.039 70,000.00 2,730.00
JUMLAH TENAGA KERJA 80,535.00
B. BAHAN
Batu Belah m3 1.200 317,000.00 380,400.00
Pasir Urug m3 0.432 499,000.00 215,568.00
JUMLAH HARGA BAHAN 595,968.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 676,503.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 676,503.00

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP


Harga Satuan : Rp. 1,123,362.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 1.500 61,000.00 91,500.00
Tukang Batu L.02 OH 0.750 70,000.00 52,500.00
Kepala Tukang L.03 OH 0.075 75,000.00 5,625.00
Mandor L.04 OH 0.075 70,000.00 5,250.00
JUMLAH TENAGA KERJA 154,875.00
B. BAHAN
Batu Belah m3 1.200 317,000.00 380,400.00
Semen Porland Kg 202.000 1,646.00 332,492.00
19 Analisa SNI - Sipil

Pasir Pasang m3 0.485 527,000.00 255,595.00


JUMLAH HARGA BAHAN 968,487.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,123,362.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 1,123,362.00
20 Analisa SNI - Sipil

Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP


Harga Satuan : Rp. 1,077,613.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 1.500 61,000.00 91,500.00
Tukang Batu L.02 OH 0.750 70,000.00 52,500.00
Kepala Tukang L.03 OH 0.075 75,000.00 5,625.00
Mandor L.04 OH 0.075 70,000.00 5,250.00
JUMLAH TENAGA KERJA 154,875.00
B. BAHAN
Batu Belah m3 1.200 317,000.00 380,400.00
Semen Porland Kg 163.000 1,646.00 268,298.00
Pasir Pasang m3 0.520 527,000.00 274,040.00
JUMLAH HARGA BAHAN 922,738.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,077,613.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 1,077,613.00

HARGA SATUAN PEKERJAAN BETON

CATATAN
Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20 %

Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan : Rp. 1,331,044.42

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 1.200 61,000.00 73,200.00
Tukang Batu L.02 OH 0.200 70,000.00 14,000.00
Kepala Tukang L.03 OH 0.020 75,000.00 1,500.00
Mandor L.04 OH 0.060 70,000.00 4,200.00
JUMLAH TENAGA KERJA 92,900.00
B. BAHAN
Semen Porland Kg 230.000 1,646.00 378,580.00
Pasir Beton M3 0.638 527,000.00 336,150.71
Kerikil (Maks 30 mm) M3 0.761 680,000.00 517,303.70
Air Liter 200.000 30.55 6,110.00
JUMLAH HARGA BAHAN 1,238,144.42
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,331,044.42
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 1,331,044.42
21 Analisa SNI - Sipil

Membuat 1 m3 beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
Harga Satuan : Rp. 1,475,371.08

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 1.650 61,000.00 100,650.00
Tukang Batu L.02 OH 0.275 70,000.00 19,250.00
Kepala Tukang L.03 OH 0.028 75,000.00 2,100.00
Mandor L.04 OH 0.083 70,000.00 5,810.00
JUMLAH TENAGA KERJA 127,810.00
B. BAHAN
Semen Porland Kg 326.000 1,646.00 536,596.00
Pasir Beton M3 0.543 527,000.00 286,085.71
Kerikil (Maks 30 mm) M3 0.762 680,000.00 518,311.11
Air Liter 215.000 30.55 6,568.25
JUMLAH HARGA BAHAN 1,347,561.08
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 1,475,371.08
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 1,475,371.08

Pembesian 10 kg dengan besi polos atau besi ulir


Harga Satuan : Rp. 185,925.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.070 61,000.00 4,270.00
Tukang Batu L.02 OH 0.070 70,000.00 4,900.00
Kepala Tukang L.03 OH 0.007 75,000.00 525.00
Mandor L.04 OH 0.004 70,000.00 280.00
JUMLAH TENAGA KERJA 9,975.00
B. BAHAN
Besi beton (polos/ulir) Kg 10.500 16,400.00 172,200.00
Kawat Beton Kg 0.150 25,000.00 3,750.00
JUMLAH HARGA BAHAN 175,950.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 185,925.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 185,925.00

Pemasangan 1 m2 bekisting untuk sloof


Harga Satuan : Rp. 203,475.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.520 61,000.00 31,720.00
Tukang Batu L.02 OH 0.260 70,000.00 18,200.00
Kepala Tukang L.03 OH 0.026 75,000.00 1,950.00
Mandor L.04 OH 0.026 70,000.00 1,820.00
JUMLAH TENAGA KERJA 53,690.00
22 Analisa SNI - Sipil

B. BAHAN
Kayu kelas III m3 0.045 3,163,000.00 142,335.00
Paku 5 – 10 cm Kg 0.300 19,500.00 5,850.00
Minyak Begesting Liter 0.100 16,000.00 1,600.00
JUMLAH HARGA BAHAN 149,785.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 203,475.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 203,475.00
23 Analisa SNI - Sipil

Pemasangan 1 m2 bekisting untuk kolom


Harga Satuan : Rp. 307,830.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 61,000.00 40,260.00
Tukang Batu L.02 OH 0.330 70,000.00 23,100.00
Kepala Tukang L.03 OH 0.033 75,000.00 2,475.00
Mandor L.04 OH 0.033 70,000.00 2,310.00
JUMLAH TENAGA KERJA 68,145.00
B. BAHAN
Kayu kelas III m3 0.040 3,163,000.00 126,520.00
Paku 5 – 12 cm Kg 0.400 19,500.00 7,800.00
Minyak Begesting Liter 0.200 16,000.00 3,200.00
Kayu Balok kelas II m3 0.015 4,426,000.00 66,390.00
Multipleks 9 mm Lbr 0.035 165,000.00 5,775.00
Dolken kayu φ 8-10/400 cm Batang 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 239,685.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 307,830.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 307,830.00

Pemasangan 1 m2 bekisting untuk balok


Harga Satuan : Rp. 373,083.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 61,000.00 40,260.00
Tukang Batu L.02 OH 0.330 70,000.00 23,100.00
Kepala Tukang L.03 OH 0.033 75,000.00 2,475.00
Mandor L.04 OH 0.033 70,000.00 2,310.00
JUMLAH TENAGA KERJA 68,145.00
B. BAHAN
Kayu kelas III 3 0.040 3,163,000.00 126,520.00
Paku 5 – 12 cm Kg 0.400 19,500.00 7,800.00
Minyak Begesting Liter 0.200 16,000.00 3,200.00
Kayu Balok kelas II m3 0.018 4,426,000.00 79,668.00
Multipleks 9 mm Lbr 0.350 165,000.00 57,750.00
Dolken kayu φ 8-10/400 cm Batang 2.000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 304,938.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 373,083.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 373,083.00
24 Analisa SNI - Sipil

Pemasangan 1 m2 bekisting untuk lantai


Harga Satuan : Rp. 419,805.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 61,000.00 40,260.00
Tukang Batu L.02 OH 0.330 70,000.00 23,100.00
Kepala Tukang L.03 OH 0.033 75,000.00 2,475.00
Mandor L.04 OH 0.033 70,000.00 2,310.00
JUMLAH TENAGA KERJA 68,145.00
B. BAHAN
Kayu kelas III m3 0.040 3,163,000.00 126,520.00
Paku 5 – 12 cm Kg 0.400 19,500.00 7,800.00
Minyak Begesting Liter 0.200 16,000.00 3,200.00
Kayu Balok kelas II m3 0.015 4,426,000.00 66,390.00
Multipleks 9 mm Lbr 0.350 165,000.00 57,750.00
Dolken kayu φ 8-10/400 cm Batang 6.000 15,000.00 90,000.00
JUMLAH HARGA BAHAN 351,660.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 419,805.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 419,805.00

Pemasangan 1 m2 bekisting untuk dinding


Harga Satuan : Rp. 365,305.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.660 61,000.00 40,260.00
Tukang Batu L.02 OH 0.330 70,000.00 23,100.00
Kepala Tukang L.03 OH 0.033 75,000.00 2,475.00
Mandor L.04 OH 0.033 70,000.00 2,310.00
JUMLAH TENAGA KERJA 68,145.00
B. BAHAN
Kayu kelas III m3 0.030 3,163,000.00 94,890.00
Paku 5 – 12 cm Kg 0.400 19,500.00 7,800.00
Minyak Begesting Liter 0.200 16,000.00 3,200.00
Kayu Balok kelas II m3 0.020 4,426,000.00 88,520.00
Multipleks 9 mm Lbr 0.350 165,000.00 57,750.00
Dolken kayu φ 8-10/400 cm Batang 3.000 15,000.00 45,000.00
Penjaga jarak bekisting/spacer Buah 4.000 -
JUMLAH HARGA BAHAN 297,160.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 365,305.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 365,305.00
25 Analisa SNI - Sipil

HARGA SATUAN PEKERJAAN PLESTERAN

Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm.


Harga Satuan : Rp. 58,343.70

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 61,000.00 18,300.00
Tukang Batu L.02 OH 0.150 70,000.00 10,500.00
Kepala Tukang L.03 OH 0.015 75,000.00 1,125.00
Mandor L.04 OH 0.015 70,000.00 1,050.00
JUMLAH TENAGA KERJA 30,975.00
B. BAHAN
Semen Porland Kg 10.224 1,646.00 16,828.70
Pasir Pasang m3 0.020 527,000.00 10,540.00
JUMLAH HARGA BAHAN 27,368.70
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 58,343.70
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 58,343.70

Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm.


Harga Satuan : Rp. 55,895.30

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 61,000.00 18,300.00
Tukang Batu L.02 OH 0.150 70,000.00 10,500.00
Kepala Tukang L.03 OH 0.015 75,000.00 1,125.00
Mandor L.04 OH 0.015 70,000.00 1,050.00
JUMLAH TENAGA KERJA 30,975.00
B. BAHAN
Semen Porland Kg 7.776 1,646.00 12,799.30
Pasir Pasang m3 0.023 527,000.00 12,121.00
JUMLAH HARGA BAHAN 24,920.30
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 55,895.30
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 55,895.30

Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm


Harga Satuan : Rp. 53,894.04

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 61,000.00 18,300.00
Tukang Batu L.02 OH 0.150 70,000.00 10,500.00
Kepala Tukang L.03 OH 0.015 75,000.00 1,125.00
Mandor L.04 OH 0.015 70,000.00 1,050.00
JUMLAH TENAGA KERJA 30,975.00
26 Analisa SNI - Sipil

B. BAHAN
Semen Porland Kg 6.240 1,646.00 10,271.04
Pasir Pasang m3 0.024 527,000.00 12,648.00
JUMLAH HARGA BAHAN 22,919.04
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 53,894.04
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 53,894.04
27 Analisa SNI - Sipil

Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm


Harga Satuan : Rp. 53,209.86

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.300 61,000.00 18,300.00
Tukang Batu L.02 OH 0.150 70,000.00 10,500.00
Kepala Tukang L.03 OH 0.015 75,000.00 1,125.00
Mandor L.04 OH 0.015 70,000.00 1,050.00
JUMLAH TENAGA KERJA 30,975.00
B. BAHAN
Semen Porland Kg 5.184 1,646.00 8,532.86
Pasir Pasang m3 0.026 527,000.00 13,702.00
JUMLAH HARGA BAHAN 22,234.86
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 53,209.86
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 53,209.86

Pemasangan 1 m2 acian.
Harga Satuan : Rp. 25,999.50

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.200 61,000.00 12,200.00
Tukang Batu L.02 OH 0.100 70,000.00 7,000.00
Kepala Tukang L.03 OH 0.010 75,000.00 750.00
Mandor L.04 OH 0.010 70,000.00 700.00
JUMLAH TENAGA KERJA 20,650.00
B. BAHAN
Semen Porland Kg 3.250 1,646.00 5,349.50
JUMLAH HARGA BAHAN 5,349.50
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 25,999.50
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 25,999.50

Pembuatan dan Pemasangan 1 Unit Men Hole uk. 60 x 60 cm


Harga Satuan : Rp. 587,628.03

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 2.0000 61,000.00 122,000.00
Tukang Besi L.02 OH 1.0000 70,000.00 70,000.00
Kepala Tukang L.03 OH
Mandor L.04 OH 0.5000 70,000.00 35,000.00
JUMLAH TENAGA KERJA 227,000.00
B. BAHAN
Besi L 30 x 30 x 3 mm Kg 3.2640 24,000.00 78,336.00
Plat Baja t = 2 mm Lbr 0.1209 1,139,000.00 137,745.23
28 Analisa SNI - Sipil

Engsel Besi Bh 2.0000 35,000.00 70,000.00


Gembok Bh 1.0000 55,000.00 55,000.00
Anker + Handel dia. 12 mm Ls 1.0000 15,000 15,000.00
Pengecatan M2 0.3600 12,630.00 4,546.80
JUMLAH HARGA BAHAN 360,628.03
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 587,628.03
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 587,628.03
29 Analisa SNI - Sipil

Pembuatan dan Pemasangan 1 Unit Men Hole uk. 100 x 100 cm


Harga Satuan : Rp. 892,815.64

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 2.0000 61,000.00 122,000.00
Tukang Besi L.02 OH 1.0000 70,000.00 70,000.00
Kepala Tukang L.03 OH
Mandor L.04 OH 0.5000 70,000.00 35,000.00
JUMLAH TENAGA KERJA 227,000.00
B. BAHAN
Besi L 30 x 30 x 3 mm Kg 5.4400 24,000.00 130,560.00
Plat Baja t = 2 mm Lbr 0.3359 1,139,000.00 382,625.64
Engsel Besi Bh 2.0000 35,000.00 70,000.00
Gembok Bh 1.0000 55,000.00 55,000.00
Anker + Handel dia. 12 mm Ls 1.0000 15,000 15,000.00
Pengecatan M2 1.0000 12,630.00 12,630.00
JUMLAH HARGA BAHAN 665,815.64
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 892,815.64
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 892,815.64

Pekerjaan 1 m² Cat Plat Besi


Harga Satuan : Rp. 12,630.00

No Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)

A. TENAGA
Pekerja L.01 OH 0.0300 61,000.00 1,830.00
Tukang Cat L.02 OH 0.0600 70,000.00 4,200.00
Kepala Tukang L.03 OH 0.060 75,000.00 4,500.00
Mandor L.04 OH 0.0100 70,000.00 700.00
JUMLAH TENAGA KERJA 11,230.00
B. BAHAN
Cat opux/resin (Belmas) Kg 0.0700 20,000.00 1,400.00
JUMLAH HARGA BAHAN 1,400.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 12,630.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 12,630.00
ANALISA HARGA SATUAN PEKERJAAN PIPA

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH


KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM

PEKERJAAN : PEMBANGUNAN SPAM DESA HAMBAWUTANG DAN KAKAHA

LOKASI : DESA HAMBAWUTANG DAN KAKAHA - KEC. NGADUNGALA


TAHUN ANGGARA : 2019

HARGA SATUAN PEKERJAAN PEMASANGAN PIPA

Pemasangan 1 M' Pipa HDPE Ø 50 mm


Harga Satuan : Rp. 41,335.00

NO Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A. TENAGA
Pekerja L.01 OH 0.035 61,000.00 2,135.00
Tukang Pipa L.02 OH 0.017 70,000.00 1,190.00
Mandor L.04 OH 0.003 70,000.00 210.00
JUMLAH TENAGA KERJA 3,535.00
B. BAHAN
Pipa HDPE dia. 50 mm ( 1.5 Inch ) M' 1.000 37,800.00 37,800.00
JUMLAH HARGA BAHAN 37,800.00
C. PERALATAN
Sewa Tripot/Tackel & handle crane 2 T Hari 0.019 -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 41,335.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 41,335.00

Pemasangan 1 M' Pipa HDPE Ø 63 mm


Harga Satuan : Rp. 63,335.00

NO Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A. TENAGA
Pekerja L.01 OH 0.035 61,000.00 2,135.00
Tukang Pipa L.02 OH 0.017 70,000.00 1,190.00
Mandor L.04 OH 0.003 70,000.00 210.00
JUMLAH TENAGA KERJA 3,535.00
B. BAHAN
Pipa HDPE dia. 63 mm ( 2 Inch ) M' 1.000 59,800.00 59,800.00
JUMLAH HARGA BAHAN 59,800.00
C. PERALATAN
Sewa Tripot/Tackel & handle crane 2 T Hari 0.019 -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 63,335.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 63,335.00

Pemasangan 1 M' Pipa HDPE Ø 90 mm


Harga Satuan : Rp. 103,820.00

NO Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 61,000.00 2,440.00
Tukang Pipa L.02 OH 0.020 70,000.00 1,400.00
Mandor L.04 OH 0.004 70,000.00 280.00
JUMLAH TENAGA KERJA 4,120.00
B. BAHAN
Pipa HDPE dia. 90 mm ( 3 Inch ) M' 1.000 99,700.00 99,700.00
JUMLAH HARGA BAHAN 99,700.00
C. PERALATAN
Sewa Tripot/Tackel & handle crane 2 T Hari 0.019 -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 103,820.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 103,820.00
Pemasangan 1 M' Pipa HDPE Ø 110 mm
Harga Satuan : Rp. 153,120.00

NO Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A. TENAGA
Pekerja L.01 OH 0.040 61,000.00 2,440.00
Tukang Pipa L.02 OH 0.020 70,000.00 1,400.00
Mandor L.04 OH 0.004 70,000.00 280.00
JUMLAH TENAGA KERJA 4,120.00
B. BAHAN
Pipa HDPE dia. 110 mm ( 4 Inch ) M' 1.000 149,000.00 149,000.00
JUMLAH HARGA BAHAN 149,000.00
C. PERALATAN
Sewa Tripot/Tackel & handle crane 2 T Hari 0.0019 -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 153,120.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 153,120.00

Pemasangan 1 M' Pipa HDPE Ø 160 mm


Harga Satuan : Rp. 318,472.00

NO Uraian Kode Satuan Koefisien Harga Satuan (Rp.) Jumlah Harga (Rp.)
A. TENAGA
Pekerja L.01 OH 0.062 61,000.00 3,782.00
Tukang Pipa L.02 OH 0.031 70,000.00 2,170.00
Mandor L.04 OH 0.006 70,000.00 420.00
JUMLAH TENAGA KERJA 6,372.00
B. BAHAN
Pipa HDPE dia. 160 mm ( 6 Inch ) M' 1.000 312,100.00 312,100.00
JUMLAH HARGA BAHAN 312,100.00
C. PERALATAN
Sewa Tripot/Tackel & handle crane 2 T Hari 0.0019 -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) 318,472.00
E. Overhead & Profit (15 % x D)
F. HARGA SATUAN PEKERJAAN (D+E) 318,472.00
ANALISA : PERHITUNGAN BIAYA TRANSPORTASI KAPAL (INLAND COST)

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH


KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM
PEKERJAAN : PEMBANGUNAN SPAM DESA HAMBAWUTANG DAN KAKAHA
LOKASI : DESA HAMBAWUTANG DAN KAKAHA - KEC. NGADUNGALA
TAHUN ANGGARAN : 2019

PENGIRIMAN VIA KARGO KAPAL LAUT


Pengiriman dari Surabaya ke Pelabuhan Nusantara III Waingapu

DATA MASUKAN

Biaya Kargo Pipa /M3 = Rp 350,000.00


Biaya sudah termasuk biaya bongkar muat di pelabuhan

A. Panjang Pipa (M')


- Pipa HDPE dia. 4 " = 110 mm = 120.00 M'
- Pipa HDPE dia. 3 " = 90 mm = 2,600.00 M'
- Pipa HDPE dia. 2 " = 63 mm = 1,800.00 M'
- Pipa HDPE dia. 1.5 " = 50 mm = 3,000.00 M'

B. Volume Pipa / Batang (M3)


- Pipa HDPE dia. 4 " = 110 mm = 0.06 M3
- Pipa HDPE dia. 3 " = 90 mm = 0.04 M3
- Pipa HDPE dia. 2 " = 63 mm = 1.30 M3
- Pipa HDPE dia. 1.5 " = 50 mm = 1.30 M3

C. Volume Total Pipa (M3)


- Pipa HDPE dia. 4 " = 110 mm = 1.14 M3
- Pipa HDPE dia. 3 " = 90 mm = 16.53 M3
- Pipa HDPE dia. 2 " = 63 mm = 23.40 M3
- Pipa HDPE dia. 1.5 " = 50 mm = 39.00 M3

JADI BIAYA PENGANGKUTAN PIPA / M3 VIA KAPAL


- Pipa HDPE dia. 4 " = 110 mm = 1.14 M3 x Rp 350,000.00 = Rp 398,937.00
- Pipa HDPE dia. 3 " = 90 mm = 16.53 M3 x Rp 350,000.00 = Rp 5,786,235.00
- Pipa HDPE dia. 2 " = 63 mm = 23.40 M3 x Rp 350,000.00 = Rp 8,190,000.00
- Pipa HDPE dia. 1.5 " = 50 mm = 39.00 M3 x Rp 350,000.00 = Rp 13,650,000.00

JUMLAH = Rp 28,025,172.00
ANALISA : PERHITUNGAN BIAYA TRANSPORTASI PIPA

PROGRAM : PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM DAN AIR LIMBAH


KEGIATAN : PENGEMBANGAN SISTEM DISTRIBUSI AIR MINUM
PEKERJAAN : PEMBANGUNAN SPAM DESA HAMBAWUTANG DAN KAKAHA
LOKASI : DESA HAMBAWUTANG DAN KAKAHA - KEC. NGADUNGALA
TAHUN ANGGARAN : 2019

DARI PELABUHAN NUSANTARA WAINGAPU III KE PEMBANGUNAN SAM DESA PRAIKALALA

DATA MASUKAN
Jarak Tempuh : 130.00 km
Sewa Truk : 1,000,000.00 / DT sudah termasuk sopir, pembantu sopir dan BBM
Kondisi jalan : : 2.00 00mendaki
Koefisien Jalan ( 1 = datar, 1,5 = bergelombang, 2 = mendaki)

A. Panjang Pipa (M')


Pipa HDPE dia. 4 " = 110 mm = 120.00 M'
Pipa HDPE dia. 3 " = 90 mm = 2,600.00 M'
Pipa HDPE dia. 2 " = 63 mm = 1,800.00 M'
Pipa HDPE dia. 1.5 " = 50 mm = 3,000.00 M'

B. Jumlah Kubikasi Pipa (M3)


Pipa HDPE dia. 4 " = 110 mm = 1.14 M3
Pipa HDPE dia. 3 " = 90 mm = 16.53 M3
Pipa HDPE dia. 2 " = 63 mm = 23.40 M3
Pipa HDPE dia. 1.5 " = 50 mm = 39.00 M3

C. Jumlah Pipa dalam 1 Dump Truck (DT)


Pipa HDPE dia. 4 " = 110 mm = 0.21 DT
Pipa HDPE dia. 3 " = 90 mm = 3.03 DT
Pipa HDPE dia. 2 " = 63 mm = 3.00 DT
Pipa HDPE dia. 1.5 " = 50 mm = 4.29 DT
Total = 10.53 DT

JADI BIAYA PENGANGKUTAN PIPA / DUMP TRUCK


Jumlah DT Sewa DT
10.53 DT x Rp 1,000,000.00 = Rp 10,528,783.27
PERHITUNGAN JUMLAH BATANG PIPA DALAM 1 TRUCK
Ukuran Bak Dump Truck
Panjang Bak (M) Lebar Bak (M) Tinggi Bak (M) Lebar Bersih Bak (M)
1.83 0.7 dia. 160 dia. 110 dia. 90
1.51 1.61 1.65

Diameter Pipa
1 Pipa HDPE dia. 6 " = 160 mm 160 0.16
Lebar (btg) Tinggi (btg) Jumlah (btg/dump)
9.44 4.38 41.29

2 Pipa HDPE dia. 4 " = 110 mm 110 0.11


Lebar (btg) Tinggi (btg) Jumlah (btg/dump)
14.64 6.36 93.14

3 Pipa HDPE dia. 3 " = 90 mm 90 0.09


Lebar (btg) Tinggi (btg) Jumlah (btg/dump)
18.33 7.78 142.59

4 Pipa HDPE dia. 2 " = 63 mm 63 0.063


Lebar (btg) Tinggi (btg) Jumlah (Rol/dump)
6.00

5 Pipa HDPE dia. 1,5 " = 50 mm 50 0.05


Lebar (btg) Tinggi (btg) Jumlah (Rol/dump)
7.00

Jadi Jumlah Batang Pipa Dalam 1 Truck


Pipa HDPE dia. 6 " = 160 mm 41.29 Btg 42.00 Btg
Pipa HDPE dia. 4 " = 110 mm 93.14 Btg 94.00 Btg
Pipa HDPE dia. 3 " = 90 mm 142.59 Btg 143.00 Btg
Pipa HDPE dia. 2 " = 63 mm 6.00 Rol 6.00 Rol
Pipa HDPE dia. 1,5 " = 50 mm 7.00 Rol 7.00 Rol
ANALISA : PERHITUNGAN BIAYA TRANSPORTASI (INLAND COST)

PENGIRIMAN VIA KARGO KAPAL LAUT


PENGIRIMAN DARI JAKARTA -Transit Surabaya - Pelabuhan Nusantara III Waingapu

DATA MASUKAN

Jarak Tempuh = - km
Biaya Kargo = Rp. 2,500
Biaya sudah termasuk biaya bongkar muat di pelabuhan
Berat Material

1 batang pipa HDPE dia. 6 " = 160 mm = 26.88 kg Berat/M' = 4.48 kg


1 batang pipa HDPE dia. 4 " = 110 mm = 12.84 kg Berat/M' = 2.14 kg
1 batang pipa HDPE dia. 3 " = 90 mm = 72.00 kg Berat/M' = 1.44 kg
1 batang pipa HDPE dia. 2 1/2 " = 75 mm = 50.00 kg Berat/M' = 1.00 kg
1 batang pipa HDPE dia. 2 " = 63 mm = 35.50 kg Berat/M' = 0.71 kg
1 batang pipa HDPE dia. 1 1/2 " = 50 mm = 22.50 kg Berat/M' = 0.45 kg
1 unit asesoeries/batang pipa dia. 6 " = 0.10 kg Berat Acc./M' = 0.58 kg
1 unit asesoeries/batang pipa dia. 4 " = 0.05 kg Berat Acc./M' = 0.28 kg
1 unit asesoeries/batang pipa dia. 3 " = 0.03 kg Berat Acc./M' = 1.56 kg
1 unit asesoeries/batang pipa dia. 2 1/2 " = 0.02 kg Berat Acc./M' = 1.08 kg
1 unit asesoeries/batang pipa dia. 2 " = 0.02 kg Berat Acc./M' = 0.77 kg
1 unit asesoeries/batang pipa dia. 1 1/2 " = 0.01 kg Berat Acc./M' = 0.49 kg

BIAYA PENGANGKUTAN PIPA / M' VIA KAPAL

1 Meter dan Acc. Pipa dia. 6 " = 160 mm = 5.19 kg x Rp. 2500 = Rp. 12,975.00
1 Meter dan Acc. Pipa dia. 4 " = 110 mm = 2.59 kg x Rp. 2500 = Rp. 6,475.00
1 Meter dan Acc. Pipa dia. 3 " = 90 mm = 3.00 kg x Rp. 2500 = Rp. 7,499.97
1 Meter dan Acc. Pipa dia. 2 1/2 " = 75 mm = 2.08 kg x Rp. 2500 = Rp. 5,208.31
1 Meter dan Acc. Pipa dia. 2 " = 63 mm = 1.48 kg x Rp. 2500 = Rp. 3,697.90
1 Meter dan Acc. Pipa dia. 1 1/2 " = 50 mm = 0.94 kg x Rp. 2500 = Rp. 2,343.74
Perhitungan Volume Pekerjaan
JARINGAN PIPA

1 Jalur Utama (Jaringan Transmisi/Distribusi)


A. Jaringan Pipa
1 Pipa HDPE dia. 160 mm ( 6 Inch ) 114.00 M' 160 6 19.00
Penyambungan / Pemasangan Pipa dia. 160 mm 114.00 M' 160
Reducer PE dia. 160 x 110 mm 1.00 Bh 160 110

PENANAMAN PIPA DIA. JARI 2


160 per m' dimensi galian urg pasir urg tanah 160 0.08
0.2000 2.2909
Total Galian Tanah 22.80
Asumsi Panjang Pipa yg ditanam 114.00 1
Asumsi Panjang Pipa yg diTrust block - 0
114.00 ok
Asumsi Panjang galian keras - -
Asumsi Panjang galian biasa 114.00 1.00
114.00 ok
Galian Tanah Keras Manual - M3
Galian Tanah Biasa Manual 22.80 M3
22.80 ok
Urugan Pasir - M3
Urugan Tanah Kembali 20.51 M3
Pekerjaan Trust Block untuk Pipa ≤ 75 mm - Unit

2 Pipa HDPE dia. 110 mm ( 4 Inch ) 120.00 M' 110 4 20.00


Penyambungan / Pemasangan Pipa dia. 110 mm 120.00 M' 110
Reducer PE dia. 110 x 90 mm 1.00 Bh 110 90

PENANAMAN PIPA DIA. JARI 2


110 per m' dimensi galian urg pasir urg tanah 110 0.055
0.1200 1.1398
Total Galian Tanah 14.40
Asumsi Panjang Pipa yg ditanam 120.00 1
Asumsi Panjang Pipa yg diTrust block - 0
120.00 ok
Asumsi Panjang galian keras - -
Asumsi Panjang galian biasa 120.00 1.00
120.00 ok
Galian Tanah Keras Manual - M3
Galian Tanah Biasa Manual 14.40 M3
14.40 ok
Urugan Pasir - M3
Urugan Tanah Kembali 13.26 M3
Pekerjaan Trust Block untuk Pipa ≤ 75 mm - Unit

3 Pipa HDPE dia. 90 mm ( 3 Inch ) 2,600 M' 90 3 52.00


Penyambungan / Pemasangan Pipa dia. 90 mm 2,600 M' 90
Reducer PE dia. 90 x 63 mm 1.00 Bh 90 63
Coupler dia. 90 mm 10.00 Bh 90

PENANAMAN PIPA DIA JARI 2


90 per m' dimensi galian urg pasir urg tanah 90 0.045
0.0875 16.5321
Total Galian Tanah 227.50
Asumsi Panjang Pipa yg ditanam 2,600.00 1
Asumsi Panjang Pipa yg diTrust block - 0
2,600.00 ok
Asumsi Panjang galian keras - -
Asumsi Panjang galian biasa 2,600.00 1.00
2,600.00 ok
Galian Tanah Keras Manual - M3
Galian Tanah Biasa Manual 227.50 M3
227.50 ok
Urugan Pasir - M3
Urugan Tanah Kembali 210.97 M3
Pekerjaan Trust Block untuk Pipa ≤ 75 mm - Unit

4 Pipa HDPE dia. 63 mm ( 2 Inch ) 1,800 M' 63 2 18.00 1,000,000,000 INGAT PIPA 1,5 DIM
Penyambungan / Pemasangan Pipa dia. 63 mm 1,800 M' 63 7,400 1,000,000,000 ingat reduser
Reducer PE dia. 63 x 50 mm 1.00 Bh 63 50
Tee dia. 63 x 50 mm 2.00 Bh 63 50
End Cap dia 63 mm 1.00 Bh 63
Coupler dia. 63 mm 10.00 Bh 63

PENANAMAN PIPA DIA JARI 2


63 per m' dimensi galian urg pasir urg tanah 63 0.0315
0.0750 5.6082
Total Galian Tanah 135.00
Asumsi Panjang Pipa yg ditanam 1,800.00 1
Asumsi Panjang Pipa yg diTrust block - 0
1,800.00 ok
Asumsi Panjang galian keras - -
Asumsi Panjang galian biasa 1,800.00 1.00
1,800.00 ok
Galian Tanah Keras Manual - M3
Galian Tanah Biasa Manual 135.00 M3
135.00 ok
Urugan Pasir - M3
Urugan Tanah Kembali 129.39 M3
4 Pipa HDPE dia. 50 mm ( 1.5 Inch ) 3,000 M' 50 1.5 30.00
Penyambungan / Pemasangan Pipa dia. 50 mm 3,000 M' 50
End Cap dia. 50 mm 3.00 Bh 50
Coupler dia. 50 mm 14.00 Bh 50

PENANAMAN PIPA DIA JARI 2


50 per m' dimensi galian urg pasir urg tanah 50 0.025
0.0750 5.8875
Total Galian Tanah 225.00
Asumsi Panjang Pipa yg ditanam 3,000.00 1
Asumsi Panjang Pipa yg diTrust block - 0
3,000.00 ok
Asumsi Panjang galian keras - -
Asumsi Panjang galian biasa 3,000.00 1.00
3,000.00 ok
Galian Tanah Keras Manual - M3
Galian Tanah Biasa Manual 225.00 M3
225.00 ok
Urugan Pasir - M3
Urugan Tanah Kembali 219.11 M3

C. PEKERJAAN PENGADAAN & PEMASANGAN POMPA AIR TENAGA SURYA


I Pekerjaan Pengadaan Pompa air Tenaga Surya (PATS)
1 Material Elektrikal
- Solar Cell 135WP Thin Film 20.00 Bh
- PV Cable set 6 mm 20.00 Set
- Bracket Penyangga Galvanize 20.00 Set
- Box Panel Outdoor 1.00 Unit
- Pump Cable NYYHY 4 x 4 mm 1.00 Set
- Sensor Cable NYYHY 2 x 0,75 mm 1.00 Set
- Pipa HDPE 2 1/2" PN 10 100.00 M'
- Well Probe Sensor 1.00 Bh
- Cable Splice Kit 2,5 - 6 sqm 1.00 Set
- PV Disconnect 440-20-6 1.00 Set
- Surge Protector 1.00 Set

2 Sistem Perpompaan
- Submersible Pump (TDH 20 m, Q 100 m3/h, Rp 2 1/2", 1.00 Unit
- Accesories PATS 1.00 Set

3 Biaya Pemasangan
- Instalasi, Testing 1.00 LS
Perhitungan Volume Pekerjaan
JARINGAN PIPA

1 Pipa HDPE dia. 110 mm ( 4 Inch )


Penyambungan / Pemasangan Pipa dia. 110 mm 120.00 M'
Reducer PE dia. 110 x 90 mm 1.00 Bh

Galian Tanah Biasa Manual 14.40 M3


Urugan Tanah Kembali 13.26 M3

2 Pipa HDPE dia. 90 mm ( 3 Inch )


Penyambungan / Pemasangan Pipa dia. 90 mm 2,600.00 M'
Reducer PE dia. 90 x 63 mm 1.00 Bh
Coupler dia. 90 mm 10.00 Bh

Galian Tanah Keras Manual - M3


Galian Tanah Biasa Manual 227.50 M3
Urugan Tanah Kembali 210.97 M3

3 Pipa HDPE dia. 63 mm ( 2 Inch )


Penyambungan / Pemasangan Pipa dia. 63 mm 1,800.00 M'
Reducer PE dia. 63 x 50 mm 1.00 Bh
Tee dia. 63 x 50 mm 2.00 Bh
End Cap dia 63 mm 1.00 Bh
Coupler dia. 63 mm 10.00 Bh

Galian Tanah Keras Manual - M3


Galian Tanah Biasa Manual 135.00 M3
Urugan Tanah Kembali 129.39 M3

4 Pipa HDPE dia. 50 mm ( 1.5 Inch )


Penyambungan / Pemasangan Pipa dia. 50 mm 3,000.00 M'
End Cap dia. 50 mm 3.00 Bh
Coupler dia. 50 mm 14.00 Bh

Galian Tanah Keras Manual - M3


Galian Tanah Biasa Manual 225.00 M3
Urugan Tanah Kembali 219.11 M3