MANAJEMEN KONTRUKSI
PEMBANGUNAN RUMAH DUA LANTAI
LUAS RUMAH 180 m
KOTA BENGKULU
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.0390 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.2000 oh Pekerja Rp. 83,000.00 Rp.
0.1500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0150 oh Kepala tukang Rp. 154,000.00 Rp.
0.0100 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.2000 ltr Minyak bekesting Rp. 8,000.00 Rp.
0.3500 lbr Teakwood 5mm Rp. 155,500.00 Rp.
0.0180 m3 Balok Kayu Rp. 12,000.00 Rp.
2.0000 Btg Kayu Dolken Rp. 12,000.00 Rp.
0.3200 oh Pekerja Rp. 83,000.00 Rp.
0.3300 oh Tukang Kayu Rp. 94,000.00 Rp.
0.0330 oh Kepala tukang Rp. 154,000.00 Rp.
0.0060 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
ABK-BKK (6.32) I M2 BEKESTING UNTUK LANTAI
0.0400 m3 kayu bekisting Rp. 1,785,000.00 Rp.
0.4000 kg Paku biasa 2"-5" Rp. 17,600.00 Rp.
0.2000 ltr Minyak bekesting Rp. 8,000.00 Rp.
0.0150 m3 Balok Kayu Rp. 12,000.00 Rp.
0.3500 lbr Teakwood 5 mm Rp. 155,500.00 Rp.
6.0000 Btg Kayu Dolken Rp. 12,000.00 Rp.
0.3200 oh Pekerja Rp. 83,000.00 Rp.
0.3300 oh Tukang Kayu Rp. 94,000.00 Rp.
0.0330 oh Kepala tukang Rp. 154,000.00 Rp.
0.0060 oh Mandor Rp. 154,000.00
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
98.3523 kg Besi beton Rp. 15,000.00 Rp.
0.3714 m2 bekesting (6.31) Rp. 222,267.00 Rp.
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
ABK-Ppld (6.47.a) I M2 PAS. LANTAI KERAMIK 30 X 30 CM
6.2500 bh Keramik 40 x 40 cm merk Roman Rp. 17,800.00 Rp.
10.0000 kg Semen Portland PCC Rp. 1,360.00 Rp.
0.0420 m3 Pasir pasang Rp. 154,000.00 Rp.
1.5000 kg Semen warna Rp. 1,760.00 Rp.
0.6200 oh Pekerja Rp. 83,000.00 Rp.
0.3500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0350 oh Kepala tukang Rp. 154,000.00 Rp.
0.0300 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
ABK-Ppld (6.47.a) I M2 PAS. LANTAI KERAMIK 25 X 25 CM
16.0000 bh Keramik 25 x 25 cm merk milan Rp. 5,500.00 Rp.
10.0000 kg Semen Portland PCC Rp. 1,360.00 Rp.
0.0420 m3 Pasir pasang Rp. 154,000.00 Rp.
1.5000 kg Semen warna Rp. 1,760.00 Rp.
0.6200 oh Pekerja Rp. 83,000.00 Rp.
0.3500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0350 oh Kepala tukang Rp. 154,000.00 Rp.
0.0300 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
ABK-CAT.6.9 I M2 PEK. CAT KAYU BARU (1 LAPIS PLAMIR 1 LAPIS CAT DASAR 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meny kayu Rp. 23,000.00 Rp.
0.1500 kg Plamur Rp. 53,000.00 Rp.
0.1700 kg Cat dasar Rp. 25,000.00 Rp.
0.2600 kg Cat penutup 2 kali Rp. 39,000.00 Rp.
0.0700 oh Pekerja Rp. 83,000.00 Rp.
0.0090 oh Tukang Rp. 94,000.00 Rp.
0.0060 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0025 oh Mandor Rp. 154,000.00 Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah Rp.
ABK-CAT.6.14 I M2 PEK. CAT TEMBOK BARU (1 LAPIS PLAMIR 1 LAPIS CAT DASAR 2 LAPIS CAT PENUTUP)
0.1000 kg Plamur Rp. 53,000.00 Rp.
0.1000 kg Cat dasar Rp. 39,000.00 Rp.
0.2600 lbr Cat Penutup 2 kali Rp. 39,000.00 Rp.
0.0200 oh Pekerja Rp. 83,000.00 Rp.
0.0630 oh Tukang Rp. 94,000.00 Rp.
0.0063 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0025 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
ABK-PKC.6.8 I BH PAS. HANDLE JENDELA
1.0000 bh Handle jendela Rp. 15,000.00 Rp.
0.0100 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0005 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.0090 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0027 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
MARHADI KURNIZA
G1B01351
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
AAN
1,440.00
308.00
3,000.00
8,300.00
14,700.00
1,540.00
154.00
29,442.00
33,200.00
6,160.00
39,360.00
43,658.00
8,008.00
51,666.00
15,936.00
2,926.00
18,862.00
47,250.00
12,450.00
1,155.00
60,855.00
198,000.00
24,900.00
1,540.00
224,440.00
193,600.00
49,500.00
64,740.00
36,660.00
6,006.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
6,006.00
356,512.00
193,600.00
221,680.00
80,080.00
124,500.00
56,400.00
9,240.00
11,550.00
697,050.00
42,000.00
37,808.00
43,120.00
26,560.00
9,400.00
1,540.00
2,310.00
162,738.00
42,000.00
25,772.00
5,852.00
26,560.00
9,400.00
1,540.00
2,310.00
113,434.00
11,587.20
2,618.00
16,600.00
14,100.00
2,310.00
1,540.00
48,755.20
7,072.00
3,080.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
16,600.00
14,100.00
2,310.00
1,540.00
44,702.00
296,480.00
80,080.00
127,890.00
136,950.00
23,500.00
3,850.00
12,320.00
681,070.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
442,000.00
85,800.00
114,660.00
136,950.00
23,500.00
3,850.00
12,320.00
819,080.00
15,750.00
255.00
581.00
658.00
107.80
46.20
17,398.00
71,400.00
5,280.00
800.00
24,900.00
24,440.00
4,004.00
770.00
131,594.00
80,325.00
5,280.00
800.00
24,900.00
24,440.00
4,004.00
770.00
140,519.00
71,400.00
7,040.00
1,600.00
54,425.00
24,000.00
24,900.00
31,020.00
5,082.00
924.00
220,391.00
71,400.00
7,040.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
1,600.00
54,425.00
216.00
24,000.00
26,560.00
31,020.00
5,082.00
924.00
222,267.00
71,400.00
7,040.00
1,600.00
180.00
54,425.00
72,000.00
26,560.00
31,020.00
5,082.00
924.00
270,231.00
819,080.00
2,526,450.00
10,527.52
3,356,057.52
819,080.00
2,439,255.00
98,363.30
3,356,698.30
819,080.00
1,475,284.50
82,549.96
2,376,914.46
819,080.00
1,221,768.00
73,192.52
2,114,040.52
819,080.00
3,041,145.00
177,769.15
4,037,994.15
819,080.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
1,475,284.50
82,549.96
2,376,914.46
819,080.00
2,439,255.00
155,586.90
3,413,921.90
819,080.00
1,583,403.00
97,575.21
2,500,058.21
819,080.00
2,742,375.00
12,160.40
3,573,615.40
819,080.00
2,311,875.00
101,336.63
3,232,291.63
819,080.00
2,814,850.50
8,106.93
3,642,037.43
819,080.00
1,541,190.00
67,557.75
2,427,827.75
819,080.00
2,311,875.00
101,336.63
3,232,291.63
819,080.00
3,699,000.00
162,138.60
4,680,218.60
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
111,250.00
13,600.00
6,468.00
2,640.00
51,460.00
32,900.00
5,390.00
4,620.00
228,328.00
88,000.00
13,600.00
6,468.00
2,640.00
51,460.00
32,900.00
5,390.00
4,620.00
205,078.00
96,000.00
15,476.80
6,468.00
51,460.00
32,900.00
5,390.00
4,620.00
212,314.80
92,000.00
12,648.00
2,772.00
49,800.00
32,900.00
6,930.00
4,620.00
201,670.00
4,273,500.00
396,000.00
1,500,000.00
220,000.00
24,750.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
6,414,250.00
4,273,500.00
375,000.00
12,000.00
264,000.00
900,000.00
184,800.00
30,800.00
6,040,100.00
155,400.00
83,000.00
235,000.00
38,500.00
7,700.00
519,600.00
135,975.00
66,400.00
188,000.00
30,800.00
6,160.00
427,335.00
112,200.00
1,245.00
11,250.00
1,650.00
66.00
126,411.00
21,861.00
3,872.00
4,150.00
8,300.00
4,700.00
770.00
770.00
44,423.00
132,500.00
2,475.00
16,600.00
9,400.00
1,540.00
154.00
162,669.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
55,000.00
880.00
20,750.00
14,100.00
23,100.00
2,002.00
115,832.00
56,332.50
900.00
12,450.00
23,500.00
3,850.00
11,550.00
108,582.50
54,390.00
2,250.00
8,300.00
9,400.00
1,540.00
770.00
76,650.00
29,450.00
16,600.00
9,400.00
1,540.00
1,540.00
58,530.00
S CAT PENUTUP)
4,600.00
7,950.00
4,250.00
10,140.00
5,810.00
846.00
924.00
385.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
34,905.00
66,000.00
830.00
47,000.00
1,540.00
770.00
116,140.00
33,000.00
1,245.00
14,100.00
2,310.00
115.50
50,770.50
33,000.00
8,300.00
940.00
1,540.00
77.00
43,857.00
21,000.00
830.00
9,400.00
1,540.00
77.00
32,847.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
15,000.00
830.00
9,400.00
1,540.00
77.00
26,847.00
7,500.00
750.00
10,500.00
1,200.00
52.50
20,002.50
2,849,000.00
170,940.00
830.00
9,400.00
1,540.00
77.00
3,031,787.00
231,000.00
7,200.00
1,540.00
83,000.00
141,000.00
231,000.00
24,640.00
719,380.00
7,150.00
10,010.00
2,988.00
5,640.00
924.00
277.20
26,989.20
21,450.00
30,030.00
4,482.00
8,460.00
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
1,386.00
415.80
66,223.80
70,375.00
98,525.00
6,723.00
12,690.00
2,079.00
631.40
191,023.40
658,610.88
3,456,560.85
46,490.08
6,723.00
35,640.00
79,488.00
50,000.00
3,240.00
13,058,458.17
207,726.35
17,602,937.32
33,456.00
351,645.40
3,799.67
149,767.00
55,324.50
228,362.77
822,355.34
Desember 2015
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Harga
No. Uraian Pekerjaan Analisa Volume Satuan
(Rp. )
1 2 3 4 5
I. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi Ls 1.000 Unit 500,000.00
2 Pek. Pasangan Bauwplank ABK-PPer.6.4 42.000 m' 29,442.00
Sub Jumlah
Sub Jumlah
Sub Jumlah
Sub Jumlah
TOTAL RAB Rp
MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6
500,000.00
1,236,564.00
1,736,564.00
2,923,267.20
327,821.56
1,252,375.20
708,960.75
5,212,424.71
39,903,523.91
2,247,531.00
48,386,752.45
4,807,489.41
906,308.54
16,685,939.54
33,740,086.75
5,087,872.62
15,568,789.74
8,603,083.19
1,050,024.45
176,987,401.59 Err:509
427,814.40
836,460.00
46,360,801.44 0.075
27,778,762.75 0.259
85,133,750.00
38,016,612.00
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6
3,076,170.00
7,654,396.20
2,310,000.00
211,594,766.79 6.900
5.190 2.80
5.190
0.091 5.28
6991532.5 0.042 0.10
95,819.54 1.410 2.37
350,414.70 25.292 0.05
2,000,000.00
9,437,766.74
15,001,006.000 262.32
6,523,308.00
18,407,624.04
83,608.53
521,244.00
350,000.00
82,782.00
25,968,566.57
10,306,136.00
10,306,136.00
1,625,960.00
2,192,850.00
1,970,820.00
671,175.00
1,440,000.00
3,650,000.00
2,741,607.00
19,632,412.00
476,453.25
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6
8,097,960.00
16,111,217.47
1,872,000
24,685,630.72
3.75
840,000.00 39.54
585,000.00
225,000.00 57,646.766 258.57
144,000.00
120,000.00
800,000.00 2.350 4.65 10.93
2,714,000.00 3.35 3.85 12.90
2.55 1.85 4.72
-
-
-
350,000.00 342.025 -
12,127,148.00 298.109 -
517,000.00 28.54
1,672,000.00
1,565,373.60 8.560 47.41
7,831,959.40
3,500,000.00
85,000.00
500,000.00
1,600,000.00 14.400 24.87
17,602,937.32 8.650
59,210,602.31 6.350
8.40 2.35 1.85
7.78 2.35 1.54
1,500,000.00 8.80 2.55 1.85
1,500,000.00 14.40 3.35 3.85
9.20
548,986,271.43 86.54
#REF!
16.600
#REF!
HADI KURNIZA
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6
82.82
31.60
195.68
309.65
237.37
92.24
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6
282,095,000.00 282,095,000.00
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )
MANAJEMEN KONTRUKSI
PEMBANGUNAN RUMAH DUA LANTAI
LUAS RUMAH 180 m
KOTA BENGKULU
Terbilang : Delapan Ratus Lima Puluh Tiga Juta Tiga Ratus Dua Puluh Lima Ribu Rupiah
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
#REF!
#REF!
#REF! 25,968,566.57
#REF! 211,594,766.79
#REF! 9,437,766.74
#REF! 25,968,566.57
#REF! 548,986,271.43
#REF! 430,937,490.40
#REF! 6,948,988.71
#REF! 183,936,390.30
#REF! 548,986,271.43
#REF! 395,531,157.10
548986271.428
548986271.428
301,640.81
-
MANAJEMEN KONTRUKSI
MANAJEMEN KONTRUKSI
PEMBANGUNAN RUMAH DUA LANTAI
LUAS RUMAH 180 m
KOTA BENGKULU
1 Persiapan
pemasangan bowplank 3
Total 3
2 Civil work dan pondasi
Penggalian 1 :. 2 m3 15 30 m3 101.748 3
Pondasi 1 :. 1 m3 10 10 m3 23.170 2
Timbunan 1 :. 4 m3 6 24 m3 21.000 1
Total 7
3 Balok Sloof
Penulangan 1 :. 25 kg 20 500 kg
> Balok sloof 35/30 926.331
>b alok sloof 15/20 28.051
Total 954.383 2
Bekisting 1 :. 2.5 m2 10 25 m2 35.712 1
Pengecoran 1 :. 0.75 m3 4 3 m3 3.571 1
Bongkar 14
Total 19
3 Kolom Lantai 1
Penulangan 1 :. 25 kg 20 500 kg
> Kolom praktis 122.903
> Kolom Utama 959.357
Total 1082.259 2
Bekisting 1 :. 2.5 m2 15 37.5 m2 37.637 1
Pengecoran 1 :. 0.75 m3 4 3 m3 3.764 1
Bongkar 7
Total 11
MARHADI KURNIZA
G1B012051
MANAJEMEN KONTRUKSI
Bongkar 14
Total 19
5 Kolom Lantai 2
Penulangan 1 :. 25 kg 10 250 kg 970.318 4
Bekisting 1 :. 2.5 m2 2 5 m2 0.750 1
Pengecoran 1 :. 0.75 m3 2 1.5 m3 0.075 1
Bongkar 7
Total 13
6 Tangga
Penulangan 1 :. 25 Kg 10 250 Kg 197.610 1
Bekisting 1 :. 2.5 m2 4 10 m2 8.500 1
Pengecoran 1 :. 0.75 m3 2 1.5 m3 0.850 1
Bongkar 7
Total 10
7 Dinding, Kusen lantai I
Dinding 1 :. 0.5 m3 20 10 m3 30.237 3
Kusen pintu dan jendela 1 :. 0.05 m3 15 0.75 m3 0.73 1
Total 4
9 Ring Balok
Penulangan 1 :. 25 kg 10 250 kg 465.654 2
Bekisting 1 :. 2.5 m2 2 5 m2 0.700 1
Pengecoran 1 :. 0.75 m3 2 1.5 m3 0.070 1
Bongkar 14
Total 18
10 Atap
Kuda-kuda dan Gording 1 :. 0.5 m3 5 2.5 m3 1.342 1
Kasau ,reng dan bubungan 1 :. 0.5 m3 4 2 m3 1.267 1
Multiroof dan List plank 1 :. 15 m2 8 120 m2 174.297 1
Nok 1 :. 10 m 6 60 m 8.100 1
Total 4
11 Lantai
Pasir Pasang 4 2
Keramik 1 :. 6 m2 12 72 m2 126.234 2
Total 4
MARHADI KURNIZA
G1B012051
MANAJEMEN KONTRUKSI
13 Kamar Mandi
Pasang Keramik 1 :. 5 m2 6 30 m2 23.750 1
Pasang Shower,Kloset 2 2
Septictank,bak penampung lemak, bak kontrol 4 4
Total 7
16 Plumbing 6 2
18 Landscaping 6 3
MARHADI KURNIZA
G1B012051
KEGIATAN : PEKERJAAN PERUMAHAN REAL-ESTATE
PEKERJAAN : PEMBANGUNAN PERUMAHAN BLOUGRANA
VOLUME : 10 HA / 180 M
LOKASI : 11 HA / 180 M
TAHUN ANGGARAN : 12 HA / 180 M
4 PEKERJAAN PASANGAN BATU BATA &KUSEN LANTAI 1 37,715,490.09 6.87 1.72 4 Hari
8 PEKERJAAN PASANGAN BATU BATA & KUSEN LANTAI 2 37,715,490.09 6.87 1.37 5 Hari
JUMLAH BOBOT
NO. JENIS PEKERJAAN
(%)
1 PEKERJAAN PERSIAPAN 1,736,564.00 Err:508
2 CIVIL WORK ,PONDASI DAN SLOOF 151,353,752.10 Err:508
3 PEKERJAAN KOLOM LANTAI 1 19,413,979.69 Err:508
4 PEKERJAAN PASANGAN BATU BATA &KUSEN LANTAI 1 Err:508 Err:508
5 PEKERJAAN BALOK & PLAT LANTAI, 65,005,566.64 Err:508
6 PEKERJAAN TANGGA, 8,457,489.41 Err:508
7 PEKERJAAN KOLOM LANTAI 2 19,413,979.69 Err:508
8 PEKERJAAN PASANGAN BATU BATA & KUSEN LANTAI 2 Err:508 Err:508
9 PEKERJAAN PLUMBING 10,009,557.58 Err:508
10 PEKERJAAN SANITASI & DRAINASE 42,519,085.32 Err:508
11 PEKERJAAN RING BALOK 8,603,083.19 Err:508
12 PEKERJAAN ATAP DAN KONSOLE 25,968,566.57 Err:508
13 PEKERJAAN INSTALASI LISTRIK 2,714,000.00 Err:508
14 PEKERJAAN PLAFOND 10,306,136.00 Err:508
15 PEKERJAAN LANTAI DAN PLESTERAN Err:509 Err:509
16 PEKERJAAN PENGECATAN 24,685,630.72 Err:508
17 PEKERJAAN LAIN - LAIN 1,500,000.00 Err:508
Kemajuan Fisik Per Minggu Err:508
RENCANA
Komulatif Err:508
TIME SCHEDULE
75
50
25
75
### -
-
-
-
-
-
-
-
-
-
Bak kamar mandi PVC
-