ABK-PPer.6.4 I M' PASANGAN BOWPLANK


0.1200 m3 kayu gelam 8-10 Rp. 12,000.00 Rp.
0.0200 kg Paku campur Rp. 15,400.00 Rp.
1.0000 m tali Rp. 3,000.00 Rp.
0.1000 oh Pekerja Rp. 83,000.00 Rp.
0.0070 m3 papan/ kayu sengon Rp. 2,100,000.00 Rp.
0.0100 oh mandor Rp. 154,000.00 Rp.
0.0010 oh kepala tukang Rp. 154,000.00
Jumlah Rp.

ABK-PT.6.1 I M3 GALIAN TANAH BIASA SEDALAM 1 M


0.4000 oh Pekerja Rp. 83,000.00 Rp.
0.0400 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PT.6.2 I M3 GALIAN TANAH BIASA SEDALAM 2 M


0.5260 oh Pekerja Rp. 83,000.00 Rp.
0.0520 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PT.6.9 I M3 URUGAN TANAH KEMBALI


0.1920 oh Pekerja Rp. 83,000.00 Rp.
0.0190 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PT.6.10 I M3 URUGAN TANAH PENINGGI BAWAH LANTAI


1.0000 m3 Tanah Urug Rp. 47,250.00 Rp.
0.1500 oh Pekerja Rp. 83,000.00 Rp.
0.0075 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PT.6.10 I M3 URUGAN PASIR


1.2000 m3 Pasir urug Rp. 165,000.00 Rp.
0.3000 oh Pekerja Rp. 83,000.00 Rp.
0.0100 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PPon (6.14) I M3 PASANGAN BATU KOSONG


1.1000 m3 Batu kali/Batu belah Rp. 176,000.00 Rp.
0.3000 m3 Pasir urug Rp. 165,000.00 Rp.
0.7800 oh Pekerja Rp. 83,000.00 Rp.
0.3900 oh Tukang Batu Rp. 94,000.00 Rp.
0.0390 oh Kepala tukang Rp. 154,000.00 Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.0390 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PPon (6.5) I M3 PASANGAN BATU KALI 1 Pc : 4 Ps


1.1000 m3 Batu kali/Batu belah Rp. 176,000.00 Rp.
163.0000 kg Semen Portland merk holcim Rp. 1,360.00 Rp.
0.5200 m3 Pasir pasang Rp. 154,000.00 Rp.
1.5000 oh Pekerja Rp. 83,000.00 Rp.
0.6000 oh Tukang Batu Rp. 94,000.00 Rp.
0.0600 oh Kepala tukang Rp. 154,000.00 Rp.
0.0750 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PD (6.9) I M2 PASANGAN BATU BATA T. 1/2 BATA 1 Pc : 2 Ps


70.0000 bh Batu bata Rp. 600.00 Rp.
27.8000 kg Semen Portland Rp. 1,360.00 Rp.
0.2800 m3 Pasir pasang Rp. 154,000.00 Rp.
0.3200 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Batu Rp. 94,000.00 Rp.
0.0100 oh Kepala tukang Rp. 154,000.00 Rp.
0.0150 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PD (6.11) I M2 PASANGAN BATU BATA T. 1/2 BATA 1 Pc : 4 Ps


70.0000 bh Batu bata Rp. 600.00 Rp.
18.9500 kg Semen Portland merk holcim Rp. 1,360.00 Rp.
0.0380 m3 Pasir pasang Rp. 154,000.00 Rp.
0.3200 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Batu Rp. 94,000.00 Rp.
0.0100 oh Kepala tukang Rp. 154,000.00 Rp.
0.0150 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PPl (6.2) I M2 PLESTERAN DINDING 1 Pc : 2 Ps T. 15 mm


8.5200 kg Semen Portland Rp. 1,360.00 Rp.
0.0170 m3 Pasir pasang Rp. 154,000.00 Rp.
0.2000 oh Pekerja Rp. 83,000.00 Rp.
0.1500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0150 oh Kepala tukang Rp. 154,000.00 Rp.
0.0100 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PPl (6.4) I M2 PLESTERAN DINDING 1 Pc : 4 Ps T. 15 mm


5.2000 kg Semen Portland Rp. 1,360.00 Rp.
0.0200 m3 Pasir pasang Rp. 154,000.00 Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.2000 oh Pekerja Rp. 83,000.00 Rp.
0.1500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0150 oh Kepala tukang Rp. 154,000.00 Rp.
0.0100 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PBtn (6.4) I M3 BETON TUMBUK 1 Pc : 3 Ps : 5 Kr


218.0000 kg Semen Portland Rp. 1,360.00 Rp.
0.5200 m3 Pasir pasang Rp. 154,000.00 Rp.
0.8700 m3 Koral Rp. 147,000.00 Rp.
1.6500 oh Pekerja Rp. 83,000.00 Rp.
0.2500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0250 oh Kepala tukang Rp. 154,000.00 Rp.
0.0800 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

ABK-PBtn (6.5) I M3 MEMBUAT BETON BERTULANG 1 Pc : 2 Ps : 3 Kr


325.0000 kg Semen Portland Rp. 1,360.00 Rp.
0.5200 m3 Pasir Beton Rp. 165,000.00 Rp.
0.7800 m3 Koral Rp. 147,000.00 Rp.
1.6500 oh Pekerja Rp. 83,000.00 Rp.
0.2500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0250 oh Kepala tukang Rp. 154,000.00 Rp.
0.0800 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PBtn (6.41) 1 KG PEKERJAAN BESI BETON


(b) 1.0500 kg Besi beton Rp. 15,000.00 Rp.
0.0150 kg Kawat beton Rp. 17,000.00 Rp.
0.0070 oh Pekerja Rp. 83,000.00 Rp.
0.0070 oh Tukang Besi Rp. 94,000.00 Rp.
0.0007 oh Kepala tukang Rp. 154,000.00 Rp.
0.0003 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-BKP (6.28) I M2 BEKESTING UNTUK PONDASI


0.0400 m3 kayu bekisting Rp. 1,785,000.00 Rp.
0.3000 kg Paku biasa 2"-5" Rp. 17,600.00 Rp.
0.1000 ltr Minyak bekesting Rp. 8,000.00 Rp.
0.3000 oh Pekerja Rp. 83,000.00 Rp.
0.2600 oh Tukang Kayu Rp. 94,000.00 Rp.
0.0260 oh Kepala tukang Rp. 154,000.00 Rp.
0.0050 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-BKS (6.29) I M2 BEKESTING UNTUK SLOOF


0.0450 m3 kayu bekisting Rp. 1,785,000.00 Rp.
0.3000 kg Paku biasa 2"-5" Rp. 17,600.00 Rp.
0.1000 ltr Minyak bekesting Rp. 8,000.00 Rp.
0.3000 oh Pekerja Rp. 83,000.00 Rp.
0.2600 oh Tukang Kayu Rp. 94,000.00 Rp.
0.0260 oh Kepala tukang Rp. 154,000.00 Rp.
0.0050 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-BKK (6.30) I M2 BEKESTING UNTUK KOLOM


0.0400 m3 kayu bekisting Rp. 1,785,000.00 Rp.
0.4000 kg Paku biasa 2"-5" Rp. 17,600.00 Rp.
0.2000 ltr Minyak bekesting Rp. 8,000.00 Rp.
0.3500 lbr Teakwood 5mm Rp. 155,500.00 Rp.
2.0000 Btg Kayu Gelam Rp. 12,000.00 Rp.
0.3000 oh Pekerja Rp. 83,000.00 Rp.
0.3300 oh Tukang Kayu Rp. 94,000.00 Rp.
0.0330 oh Kepala tukang Rp. 154,000.00 Rp.
0.0060 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
ABK-BKK (6.31) I M2 BEKESTING UNTUK BALOK
0.0400 m3 kayu bekisting Rp. 1,785,000.00 Rp.
0.4000 kg Paku biasa 2"-5" Rp. 17,600.00 Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.2000 ltr Minyak bekesting Rp. 8,000.00 Rp.
0.3500 lbr Teakwood 5mm Rp. 155,500.00 Rp.
0.0180 m3 Balok Kayu Rp. 12,000.00 Rp.
2.0000 Btg Kayu Dolken Rp. 12,000.00 Rp.
0.3200 oh Pekerja Rp. 83,000.00 Rp.
0.3300 oh Tukang Kayu Rp. 94,000.00 Rp.
0.0330 oh Kepala tukang Rp. 154,000.00 Rp.
0.0060 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
ABK-BKK (6.32) I M2 BEKESTING UNTUK LANTAI
0.0400 m3 kayu bekisting Rp. 1,785,000.00 Rp.
0.4000 kg Paku biasa 2"-5" Rp. 17,600.00 Rp.
0.2000 ltr Minyak bekesting Rp. 8,000.00 Rp.
0.0150 m3 Balok Kayu Rp. 12,000.00 Rp.
0.3500 lbr Teakwood 5 mm Rp. 155,500.00 Rp.
6.0000 Btg Kayu Dolken Rp. 12,000.00 Rp.
0.3200 oh Pekerja Rp. 83,000.00 Rp.
0.3300 oh Tukang Kayu Rp. 94,000.00 Rp.
0.0330 oh Kepala tukang Rp. 154,000.00 Rp.
0.0060 oh Mandor Rp. 154,000.00
Jumlah Rp.

ABK-Supl.V.a I M3 BETON PONDASI PLAT


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
168.4300 kg Besi beton Rp. 15,000.00 Rp.
0.0800 m2 Bekesting (6.28) Rp. 131,594.00 Rp.
Jumlah Rp.

ABK-Supl.V.b I M3 BETON SLOOF 15/20


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
162.6170 kg Besi beton Rp. 15,000.00 Rp.
0.7000 m2 Bekesting (6.29) Rp. 140,519.00 Rp.
Jumlah Rp.

ABK-Supl. V.c I M3 BETON BALOK KOPEL 30/30


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
98.3523 kg Besi beton Rp. 15,000.00 Rp.
0.3714 m2 bekesting (6.31) Rp. 222,267.00 Rp.
Jumlah Rp.

ABK-Supl.V.d I M3 BETON KOLOM UTAMA 30/35


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
81.4512 kg Besi beton Rp. 15,000.00 Rp.
0.3293 m2 bekesting (6.31) Rp. 222,267.00 Rp.
Jumlah Rp.

ABK-Supl.V.e I M3 BETON KOLOM PRAKTIS 17/15


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
202.7430 kg Besi beton Rp. 15,000.00 Rp.
0.7998 m2 bekesting (6.30) Rp. 222,267.00 Rp.
Jumlah Rp.

ABK-Supl.V.f I M3 BETON BALOK UTAMA 30/28


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
98.3523 kg Besi beton Rp. 15,000.00 Rp.
0.3714 m2 bekesting (6.31) Rp. 222,267.00 Rp.
Jumlah Rp.

ABK-Supl.V.g I M3 BETON RING BALOK 15/20


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
162.6170 kg Besi beton Rp. 15,000.00 Rp.
0.7000 m2 bekesting (6.31) Rp. 222,267.00 Rp.
Jumlah Rp.

ABK-Supl.V.h I M3 BETON BALOK LANTAI 28/25


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
105.5602 kg Besi beton Rp. 15,000.00 Rp.
0.4390 m2 bekesting (6.31) Rp. 222,267.00 Rp.
Jumlah Rp.

ABK-Supl.V.i I M3 BETON PLAT LANTAI (Tebal 13 mm)


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
182.8250 kg Besi beton Rp. 15,000.00 Rp.
0.0450 m2 bekesting (6.32) Rp. 270,231.00 Rp.
Jumlah Rp.

ABK-Supl.V.j I M3 BETON PLAT CANOPY (Tebal 8 mm)


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
154.1250 kg Besi beton Rp. 15,000.00 Rp.
0.3750 m2 bekesting (6.32) Rp. 270,231.00 Rp.
Jumlah Rp.

ABK-Supl.V.k I M3 BETON TANGGA


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
187.6567 kg Besi beton Rp. 15,000.00 Rp.
0.0300 m2 bekesting (6.32) Rp. 270,231.00 Rp.
Jumlah Rp.

ABK-Supl.V.l I M3 DAG BETON (Tebal 13 mm)


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
102.7460 kg Besi beton Rp. 15,000.00 Rp.
0.2500 m2 bekesting (6.32) Rp. 270,231.00 Rp.
Jumlah Rp.

ABK-Supl.V.m I M3 BETON PLAT BETON ( Tebal 10 cm)


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
154.1250 kg Besi beton Rp. 15,000.00 Rp.
0.3750 m2 bekesting (6.32) Rp. 270,231.00 Rp.
Jumlah Rp.

ABK-Supl.V.n I M3 BETON PLAT BETON ( Tebal 5 cm)


1.0000 m3 Beton 1 : 2 : 3 Rp. 819,080.00 Rp.
246.6000 kg Besi beton Rp. 15,000.00 Rp.
0.6000 m2 bekesting (6.32) Rp. 270,231.00 Rp.
Jumlah Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
ABK-Ppld (6.47.a) I M2 PAS. LANTAI KERAMIK 30 X 30 CM
6.2500 bh Keramik 40 x 40 cm merk Roman Rp. 17,800.00 Rp.
10.0000 kg Semen Portland PCC Rp. 1,360.00 Rp.
0.0420 m3 Pasir pasang Rp. 154,000.00 Rp.
1.5000 kg Semen warna Rp. 1,760.00 Rp.
0.6200 oh Pekerja Rp. 83,000.00 Rp.
0.3500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0350 oh Kepala tukang Rp. 154,000.00 Rp.
0.0300 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.
ABK-Ppld (6.47.a) I M2 PAS. LANTAI KERAMIK 25 X 25 CM
16.0000 bh Keramik 25 x 25 cm merk milan Rp. 5,500.00 Rp.
10.0000 kg Semen Portland PCC Rp. 1,360.00 Rp.
0.0420 m3 Pasir pasang Rp. 154,000.00 Rp.
1.5000 kg Semen warna Rp. 1,760.00 Rp.
0.6200 oh Pekerja Rp. 83,000.00 Rp.
0.3500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0350 oh Kepala tukang Rp. 154,000.00 Rp.
0.0300 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-Ppld (6.44.b) I M2 PAS. LANTAI KERAMIK 20 x 20 CM


25.0000 bh Keramik 20 x 20 cm merk Roman Rp. 3,840.00 Rp.
11.3800 kg Semen Portland PCC Rp. 1,360.00 Rp.
0.0420 m3 Pasir pasang Rp. 154,000.00 Rp.
0.6200 oh Pekerja Rp. 83,000.00 Rp.
0.3500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0350 oh Kepala tukang Rp. 154,000.00 Rp.
0.0300 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-Ppld (6.68) I M2 PAS.DINDING KERAMIK 20 x 20 CM


25.0000 bh Keramik 20 x 20 cm merk roman Rp. 3,680.00 Rp.
9.3000 kg Semen Portland PCC Rp. 1,360.00 Rp.
0.0180 m3 Pasir pasang Rp. 154,000.00 Rp.
0.6000 oh Pekerja Rp. 83,000.00 Rp.
0.3500 oh Tukang Batu Rp. 94,000.00 Rp.
0.0450 oh Kepala tukang Rp. 154,000.00 Rp.
0.0300 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PK.6.1 I M3 PEK. KUSEN PINTU / JENDELA KAYU


1.1000 m3 Kayu Kelas II, balok Rp. 3,885,000.00 Rp.
6.0000 oh Pekerja Rp. 66,000.00 Rp.
20.0000 oh Tukang Rp. 75,000.00 Rp.
2.0000 oh Kepala Tukang Rp. 110,000.00 Rp.
0.3000 oh Mandor Rp. 82,500.00 Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah Rp.

ABK-PK.6.3 I M2 PEK. KUDA KUDA / GORDING KAYU KELAS. II


1.1000 m3 Kayu Kelas II, balok Rp. 3,885,000.00 Rp.
15.0000 kg Besi strip Rp. 25,000.00 Rp.
0.8000 kg Paku Rp. 15,000.00 Rp.
4.0000 oh Pekerja Rp. 66,000.00 Rp.
12.0000 oh Tukang Rp. 75,000.00 Rp.
1.2000 oh Kepala Tukang Rp. 154,000.00 Rp.
0.2000 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PKc.6.7 I M2 PEK. PINTU PANEL KAYU


0.0400 m3 Kayu Kelas II, papan Rp. 3,885,000.00 Rp.
1.0000 oh Pekerja Rp. 83,000.00 Rp.
2.5000 oh Tukang Rp. 94,000.00 Rp.
0.2500 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0500 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PKc.6.10 I M2 PEK. PAS. DAUN JENDELA


0.0350 m3 Kayu Kelas II, papan Rp. 3,885,000.00 Rp.
0.8000 oh Pekerja Rp. 83,000.00 Rp.
2.0000 oh Tukang Rp. 94,000.00 Rp.
0.2000 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0400 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PKc.6.17 I M2 PEK. PAS. KACA T. 5 MM


1.1000 m2 Kaca Putih Polos 5 mm Rp. 102,000.00 Rp.
0.0150 oh Pekerja Rp. 83,000.00 Rp.
0.1500 oh Tukang Rp. 75,000.00 Rp.
0.0150 oh Kepala Tukang Rp. 110,000.00 Rp.
0.0008 oh Mandor Rp. 82,500.00 Rp.
Jumlah Rp.

ABK-pll.6.22 1 M2 PAS. PLAFON GYPSUM


0.3470 m2 gypsum jaya board Rp. 63,000.00 Rp.
0.1100 m2 paku piser Rp. 35,200.00 Rp.
0.8300 kg compoun Rp. 5,000.00 Rp.
0.1000 oh Pekerja Rp. 83,000.00 Rp.
0.0500 oh Tukang Rp. 94,000.00 Rp.
0.0050 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0050 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PK.6.32 1 M2 PEKERJAAN PAS. ATAP SENG


2.6500 lbr Seng gelombang BJLS 20 Rp. 50,000.00 Rp.
0.0750 kg Paku Seng Rp. 33,000.00 Rp.
0.2000 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0010 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

ABK-PAtp.6.36 I M2 PAS. ATAP NOK SENG


1.1000 lbr Bubungan atap seng Rp. 50,000.00 Rp.
0.0500 kg Paku biasa Rp. 17,600.00 Rp.
0.2500 oh Pekerja Rp. 83,000.00 Rp.
0.1500 oh Tukang Rp. 94,000.00 Rp.
0.1500 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0130 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PK.6.51 I M' PAS. LISPLANK PAPAN


0.0145 m3 Kayu Kelas II, papan Rp. 3,885,000.00 Rp.
0.0600 kg Paku biasa 2" - 5" Rp. 15,000.00 Rp.
0.1500 oh Pekerja Rp. 83,000.00 Rp.
0.2500 oh Tukang Rp. 94,000.00 Rp.
0.0250 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0750 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PK. 6.31 I M' PAS. RANGKA ATAP


0.0140 m3 Kayu Kelas II, papan Rp. 3,885,000.00 Rp.
0.1500 kg Paku biasa 2" - 5" Rp. 15,000.00 Rp.
0.1000 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0050 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PAtp.6.36 I M' PAS. NOK SAMPING


1.0000 bh Nok Bubungan Rp. 29,450.00 Rp.
0.2000 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0100 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-CAT.6.9 I M2 PEK. CAT KAYU BARU (1 LAPIS PLAMIR 1 LAPIS CAT DASAR 2 LAPIS CAT PENUTUP)
0.2000 kg Cat meny kayu Rp. 23,000.00 Rp.
0.1500 kg Plamur Rp. 53,000.00 Rp.
0.1700 kg Cat dasar Rp. 25,000.00 Rp.
0.2600 kg Cat penutup 2 kali Rp. 39,000.00 Rp.
0.0700 oh Pekerja Rp. 83,000.00 Rp.
0.0090 oh Tukang Rp. 94,000.00 Rp.
0.0060 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0025 oh Mandor Rp. 154,000.00 Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah Rp.

ABK-CAT.6.14 I M2 PEK. CAT TEMBOK BARU (1 LAPIS PLAMIR 1 LAPIS CAT DASAR 2 LAPIS CAT PENUTUP)
0.1000 kg Plamur Rp. 53,000.00 Rp.
0.1000 kg Cat dasar Rp. 39,000.00 Rp.
0.2600 lbr Cat Penutup 2 kali Rp. 39,000.00 Rp.
0.0200 oh Pekerja Rp. 83,000.00 Rp.
0.0630 oh Tukang Rp. 94,000.00 Rp.
0.0063 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0025 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PKC.6.1 I BH PAS. KUNCI PINTU


1.0000 bh Kunci tanam 2 slaag Rp. 66,000.00 Rp.
0.0100 oh Pekerja Rp. 83,000.00 Rp.
0.5000 oh Tukang Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0050 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PKC.6.5 I BH PAS. ENGSEL PINTU


1.0000 set Engsel pintu Rp. 33,000.00 Rp.
0.0150 oh Pekerja Rp. 83,000.00 Rp.
0.1500 oh Tukang Rp. 94,000.00 Rp.
0.0150 oh Kepala Tukang Rp. 154,000.00 Rp.
0.00075 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PKC.6.2 I BH PAS. ENGSEL JENDELA


1.0000 set Engsel jendela Rp. 33,000.00 Rp.
0.1000 oh Tukang Rp. 83,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 94,000.00 Rp.
0.0100 oh Pekerja Rp. 154,000.00 Rp.
0.0005 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PKC.6.6 I BH PAS. GRENDEL JENDELA


1.0000 set Grendel jendela Rp. 21,000.00 Rp.
0.0100 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0005 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
ABK-PKC.6.8 I BH PAS. HANDLE JENDELA
1.0000 bh Handle jendela Rp. 15,000.00 Rp.
0.0100 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0005 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

0 I BH PAS. HAK ANGIN JENDELA


1.0000 set Hak angin Rp. 7,500.00 Rp.
0.0150 oh Pekerja Rp. 50,000.00 Rp.
0.1500 oh Tukang Rp. 70,000.00 Rp.
0.0150 oh Kepala Tukang Rp. 80,000.00 Rp.
0.0008 oh Mandor Rp. 70,000.00 Rp.
jumlah Rp.

ABK-PSan.6.1 PEMASANGAN 1 BH KLOSET DUDUK/MONOBLOK


1.0000 bh Kloset Duduk Rp. 2,849,000.00 Rp.
0.0600 ls Perlengkapan Rp. 2,849,000.00 Rp.
0.0100 oh Pekerja Rp. 83,000.00 Rp.
0.1000 oh Tukang Batu Rp. 94,000.00 Rp.
0.0100 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0005 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PSan.6.2 PEMASANGAN 1 BH KLOSET JONGKOK


1.0000 bh Kloset jongkok Rp. 231,000.00 Rp.
6.0000 kg Semen Portland Rp. 1,200.00 Rp.
0.0100 m3 Pasir Pasang Rp. 154,000.00 Rp.
1.0000 oh Pekerja Rp. 83,000.00 Rp.
1.5000 oh Tukang Batu Rp. 94,000.00 Rp.
1.5000 oh Kepala Tukang Rp. 154,000.00 Rp.
0.1600 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PSan.6.26 PEMASANGAN 1 M' PIPA PVC 3/4"


1.0000 m' Pipa PVC 3/4" Rp. 28,600.00 Rp.
0.3500 ls Perlengkapan Rp. 28,600.00 Rp.
0.0360 oh Pekerja Rp. 83,000.00 Rp.
0.0600 oh Tukang Batu Rp. 94,000.00 Rp.
0.0060 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0018 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PSan.6.29 PEMASANGAN 1 M' PIPA PVC 2"


1.0000 m' Pipa PVC 2" Rp. 85,800.00 Rp.
0.3500 ls Perlengkapan Rp. 85,800.00 Rp.
0.0540 oh Pekerja Rp. 83,000.00 Rp.
0.0900 oh Tukang Batu Rp. 94,000.00 Rp.

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
0.0090 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0027 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-PSan.6.32 PEMASANGAN 1 M' PIPA PVC 4"


1.0000 m' Pipa PVC 4" Rp. 281,500.00 Rp.
0.3500 ls Perlengkapan Rp. 281,500.00 Rp.
0.0810 oh Pekerja Rp. 83,000.00 Rp.
0.1350 oh Tukang Batu Rp. 94,000.00 Rp.
0.0135 oh Kepala Tukang Rp. 154,000.00 Rp.
0.0041 oh Mandor Rp. 154,000.00 Rp.
Jumlah Rp.

ABK-SPT 1 BH SEPTICTANK + PERESAPAN


16.7330 m3 Galian Tanah Rp. 39,360.00 Rp.
30.4720 m2 Pas. Batu Bata Rp. 113,434.00 Rp.
1.0400 m2 Plesteran Rp. 44,702.00 Rp.
0.0810 oh Pekerja Rp. 83,000.00 Rp.
0.2160 m3 Pasir Urug Rp. 165,000.00 Rp.
0.2160 m3 Kerikil / Splite Rp. 368,000.00 Rp.
2.0000 bh Pipa Hawa Rp. 25,000.00 Rp.
0.2160 kg Ijuk Rp. 15,000.00 Rp.
4.0400 m3 Plat Beton Rp. 3,232,291.63 Rp.
0.3050 m3 Lantai Kerja Rp. 681,070.00 Rp.
Jumlah Rp.

ABK-SPT 1 BH BAK PENANGKAP LEMAK


0.8500 m3 Galian Tanah Rp. 39,360.00 Rp.
3.1000 m2 Pas. Batu Bata Rp. 113,434.00 Rp.
0.0850 m2 Plesteran Rp. 44,702.00 Rp.
0.0320 m3 Plat Beton Rp. 4,680,218.60 Rp.
0.3353 m3 Pasir Urug Rp. 165,000.00 Rp.
0.3353 m3 Beton tumbuk Rp. 681,070.00 Rp.
Jumlah Rp.

Bengkulu, Desember 2015


Disusun oleh

MARHADI KURNIZA
G1B01351

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

AAN

1,440.00
308.00
3,000.00
8,300.00
14,700.00
1,540.00
154.00
29,442.00

33,200.00
6,160.00
39,360.00

43,658.00
8,008.00
51,666.00

15,936.00
2,926.00
18,862.00

47,250.00
12,450.00
1,155.00
60,855.00

198,000.00
24,900.00
1,540.00
224,440.00

193,600.00
49,500.00
64,740.00
36,660.00
6,006.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
6,006.00
356,512.00

193,600.00
221,680.00
80,080.00
124,500.00
56,400.00
9,240.00
11,550.00
697,050.00

42,000.00
37,808.00
43,120.00
26,560.00
9,400.00
1,540.00
2,310.00
162,738.00

42,000.00
25,772.00
5,852.00
26,560.00
9,400.00
1,540.00
2,310.00
113,434.00

11,587.20
2,618.00
16,600.00
14,100.00
2,310.00
1,540.00
48,755.20

7,072.00
3,080.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
16,600.00
14,100.00
2,310.00
1,540.00
44,702.00

296,480.00
80,080.00
127,890.00
136,950.00
23,500.00
3,850.00
12,320.00
681,070.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

442,000.00
85,800.00
114,660.00
136,950.00
23,500.00
3,850.00
12,320.00
819,080.00

15,750.00
255.00
581.00
658.00
107.80
46.20
17,398.00

71,400.00
5,280.00
800.00
24,900.00
24,440.00
4,004.00
770.00
131,594.00

80,325.00
5,280.00
800.00
24,900.00
24,440.00
4,004.00
770.00
140,519.00

71,400.00
7,040.00
1,600.00
54,425.00
24,000.00
24,900.00
31,020.00
5,082.00
924.00
220,391.00

71,400.00
7,040.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
1,600.00
54,425.00
216.00
24,000.00
26,560.00
31,020.00
5,082.00
924.00
222,267.00

71,400.00
7,040.00
1,600.00
180.00
54,425.00
72,000.00
26,560.00
31,020.00
5,082.00
924.00
270,231.00

819,080.00
2,526,450.00
10,527.52
3,356,057.52

819,080.00
2,439,255.00
98,363.30
3,356,698.30

819,080.00
1,475,284.50
82,549.96
2,376,914.46

819,080.00
1,221,768.00
73,192.52
2,114,040.52

819,080.00
3,041,145.00
177,769.15
4,037,994.15

819,080.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
1,475,284.50
82,549.96
2,376,914.46

819,080.00
2,439,255.00
155,586.90
3,413,921.90

819,080.00
1,583,403.00
97,575.21
2,500,058.21

819,080.00
2,742,375.00
12,160.40
3,573,615.40

819,080.00
2,311,875.00
101,336.63
3,232,291.63

819,080.00
2,814,850.50
8,106.93
3,642,037.43

819,080.00
1,541,190.00
67,557.75
2,427,827.75

819,080.00
2,311,875.00
101,336.63
3,232,291.63

819,080.00
3,699,000.00
162,138.60
4,680,218.60

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

111,250.00
13,600.00
6,468.00
2,640.00
51,460.00
32,900.00
5,390.00
4,620.00
228,328.00

88,000.00
13,600.00
6,468.00
2,640.00
51,460.00
32,900.00
5,390.00
4,620.00
205,078.00

96,000.00
15,476.80
6,468.00
51,460.00
32,900.00
5,390.00
4,620.00
212,314.80

92,000.00
12,648.00
2,772.00
49,800.00
32,900.00
6,930.00
4,620.00
201,670.00

4,273,500.00
396,000.00
1,500,000.00
220,000.00
24,750.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
6,414,250.00

4,273,500.00
375,000.00
12,000.00
264,000.00
900,000.00
184,800.00
30,800.00
6,040,100.00

155,400.00
83,000.00
235,000.00
38,500.00
7,700.00
519,600.00

135,975.00
66,400.00
188,000.00
30,800.00
6,160.00
427,335.00

112,200.00
1,245.00
11,250.00
1,650.00
66.00
126,411.00

21,861.00
3,872.00
4,150.00
8,300.00
4,700.00
770.00
770.00
44,423.00

132,500.00
2,475.00
16,600.00
9,400.00
1,540.00
154.00
162,669.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

55,000.00
880.00
20,750.00
14,100.00
23,100.00
2,002.00
115,832.00

56,332.50
900.00
12,450.00
23,500.00
3,850.00
11,550.00
108,582.50

54,390.00
2,250.00
8,300.00
9,400.00
1,540.00
770.00
76,650.00

29,450.00
16,600.00
9,400.00
1,540.00
1,540.00
58,530.00

S CAT PENUTUP)
4,600.00
7,950.00
4,250.00
10,140.00
5,810.00
846.00
924.00
385.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
34,905.00

APIS CAT PENUTUP)


5,300.00
3,900.00
10,140.00
1,660.00
5,922.00
970.20
385.00
28,277.20

66,000.00
830.00
47,000.00
1,540.00
770.00
116,140.00

33,000.00
1,245.00
14,100.00
2,310.00
115.50
50,770.50

33,000.00
8,300.00
940.00
1,540.00
77.00
43,857.00

21,000.00
830.00
9,400.00
1,540.00
77.00
32,847.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

15,000.00
830.00
9,400.00
1,540.00
77.00
26,847.00

7,500.00
750.00
10,500.00
1,200.00
52.50
20,002.50

2,849,000.00
170,940.00
830.00
9,400.00
1,540.00
77.00
3,031,787.00

231,000.00
7,200.00
1,540.00
83,000.00
141,000.00
231,000.00
24,640.00
719,380.00

7,150.00
10,010.00
2,988.00
5,640.00
924.00
277.20
26,989.20

21,450.00
30,030.00
4,482.00
8,460.00

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
1,386.00
415.80
66,223.80

70,375.00
98,525.00
6,723.00
12,690.00
2,079.00
631.40
191,023.40

658,610.88
3,456,560.85
46,490.08
6,723.00
35,640.00
79,488.00
50,000.00
3,240.00
13,058,458.17
207,726.35
17,602,937.32

33,456.00
351,645.40
3,799.67
149,767.00
55,324.50
228,362.77
822,355.34

Desember 2015

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

RENCANA ANGGARAN BIAYA ( R A B )


MANAJEMEN KONTRUKSI
PEMBANGUNAN RUMAH DUA LANTAI
LUAS RUMAH 180 m
KOTA BENGKULU

Harga
No. Uraian Pekerjaan Analisa Volume Satuan
(Rp. )
1 2 3 4 5

I. PEKERJAAN PERSIAPAN
1 Pek. Pembersihan Lokasi Ls 1.000 Unit 500,000.00
2 Pek. Pasangan Bauwplank ABK-PPer.6.4 42.000 m' 29,442.00
Sub Jumlah

II. PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Biasa ABK-PT.6.1 74.270 m3 39,360.00
2 Pek. Urugan Tanah Kembali ABK-PT.6.9 17.380 m3 18,862.00
3 Pek. Urugan pasir ABK-PT.6.11 5.580 m3 224,440.00
4 Pek. Urugan Tanah Peninggi Lantai ABK-PT.6.10 11.650 m3 60,855.00
Sub Jumlah

III. PEKERJAAN BETON


1 Pek. Beton Pondasi Setempat ABK-Supl.V.a 11.890 m3 3,356,057.52
2 Pek. Lantai Kerja 1 : 3 : 5 tebal 10 cm ABK-PBtn (6.4) 3.300 m3 681,070.00
3 Pek. Plat Lantai 1 : 2 : 3 tebal 13 cm ABK-Supl.V.i 13.540 m3 3,573,615.40
4 Pek. Beton Tangga ABK-Supl.V.k 1.320 m3 3,642,037.43
5 Pek. Balok Sloof 15/20 ABK-Supl.V.b 0.270 m3 3,356,698.30
6 Pek. Balok Sloof 30/30 ABK-Supl.V.c 7.020 m3 2,376,914.46
7 Pek. Kolom Utama 30/35 . ABK-Supl.V.d 15.960 m3 2,114,040.52
8 Pek. Kolom Praktis 17/15 ABK-Supl.V.e 1.260 m3 4,037,994.1
9 Pek. Balok Utama 30/28 ABK-Supl.V.f 6.550 m3 2,376,914.46
10 Pek. Ring balok 15/20 ABK-Supl.V.g 2.520 m3 3,413,921.90
11 Pek. Balok Anak 28/25 ABK-Supl.V.h 0.420 m3 2,500,058.21
Sub Jumlah

IV. PEKERJAAN PASANGAN


1 Pek. Pasangan Batu Kosong ABK-PPon (6.14) 1.200 m3 356,512.00
2 Pek. Pasangan Batu Kali 1 :4 ABK-PPon (6.5) 1.200 m3 697,050.00
3 Pas. Batu Bata 1:2 ABK-PD.6.9 284.880 m2 162,738.00
4 Pek. Plesteran 1:2 ABK-PPL.6.2 569.760 m2 48,755.20
5 Pek. Beton Tumbuk Bawah Lantai ABK-PBtn (6.4) 125.000 m2 681,070.00
6 Pas. Lantai keramik 30 x 30 cm ABK-Ppld (6.44.a) 166.500 m2 228,328.00
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Harga
No. Uraian Pekerjaan Analisa Volume Satuan
(Rp. )
1 2 3 4 5

7 Pas. Lantai keramik 25 x 25 cm ABK-Ppld (6.44.a) 15.000 m2 205,078.00


9 Pas. Dinding keramik 20 x 20 cm T. 200 cm ABK-Ppld (6.44 b) 34.680 m2 220,715.00
10 Pek. Saluran Air Hujan Ls 42.000 m' 55,000.00

Sub Jumlah

V. PEKERJAAN KAYU DAN KACA


1 Pek. Kusen pintu/jendela ABK-PK.6.1 1.090 m3 6,414,250.00
2 Pek. Pasangan Kaca T. 5 mm ABK-PKc.6.17 0.758 m3 126,411.00
3 Pek. Daun Pintu ABK-PKc.6.7 0.820 m3 427,335.00
4 Pek. Pintu PVC Ls 5.000 Unit 400,000.00

Sub Jumlah

VI. PEKERJAAN ATAP


1 Pek. Kuda-kuda + gording ABK-PK.6.3 1.080 m3 6,040,100.00
2 Pek. Atap Seng gelombang ABK-Ppa 6.38 113.160 m3 162,669.00
3 Pek. Lisplank 5/7 ABK-PK.6.51 0.770 m3 108,582.50
4 Pek. Nok Atap Seng ABK-Ppa 6.39 4.500 m 115,832.00
5 Residu Atap ls 1.000 Unit 350,000.00
6 Pek. Rangka Atap Kayu ABK-PK. 6.31 1.080 m3 76,650.00

Sub Jumlah

VII. PEKERJAAN PLAPOND


1 Pek. Rangka Plapond + Plapond gypsum ABK-PLL.6.22 232.000 m2 44,423.00
Sub Jumlah

VIII. PEKERJAAN KUNCI & BESI PENGGANTUNG


1 Pek. Pas. Kunci Pintu ABK-PKC.6.1 14.000 Bh 116,140.00
2 Pek. Pas. Engsel Jendela ABK-PKC.6.2 50.000 Bh 43,857.00
3 Pek. Pas. Grendel Jendela ABK-PKC.6.6 60.000 Bh 32,847.00
4 Pek. Pas. Tarikan Jendela ABK-PKC.6.8 25.000 Bh 26,847.00

5 Pek. Tarikan Pintu Ls 18.000 Bh 80,000.00


6 Pek. Relling Tangga Stenless Steel Ls 7.300 m 500,000.00
7 Pek. Pas. Engsel Pintu ABK-PKC.6.5 54.000 m 50,770.50
Sub Jumlah
IX. PEKERJAAN PENGECATAN
1 Cat Kayu Dan Kusen ABK-CAT.6.9 13.650 m2 34,905.00
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Harga
No. Uraian Pekerjaan Analisa Volume Satuan
(Rp. )
1 2 3 4 5

2 Cat plafond ABK-CAT.6.9 232.000 m2 34,905.00


3 Cat Tembok ABK-CAT.6.14 569.8 m2 28,277.20
4 Cat listpank ABK-CAT.6.9 48 m2 39,000
Sub Jumlah
X. PEKERJAAN INSTALASI LISTRIK
1 Pek. Pas. Lampu S1 18 Watt (Philips) + Fitting Ls 21.000 Bh 40,000.00
2 Pek. Pas. Stop Kontak Ls 13.000 Bh 45,000.00
3 Pek. Pas. Saklar Tunggal Ls 5.000 Bh 45,000.00
4 Pek. Pas. Saklar Ganda Ls 8.000 Bh 18,000.00
5 Pek. Titik Api Ls 1.000 Bh 120,000.00
6 Pek. Box MCB Ls 1.000 Unit 800,000.00
Sub Jumlah

XI. PEKERJAAN SANITASI


1 Pek. Instalasi air bersih Ls 1.000 unit 350,000.00
2 Pek. Pas. Closed Duduk ABK-PSan.6.1 4.000 bh 3,031,787.00
3 Pek. Bak cuci piring standlees steel Ls 1.000 unit 517,000.00
4 Pek. Bak kamar mandi PVC Ls 4.000 unit 418,000.00
5 Pek. Pas. Pipa PVC 3/4" Air Bersih ABK-PSan.6.26 58.000 m' 26,989.20
6 Pek. Pas. Pipa PVC 4" Air Kotor Ls 41.000 m' 191,023.40
7 Pek. Sumur Ls 1.000 bh 3,500,000.00
8 Pek. Kran Air standlees steel 1/2" Ls 5.000 bh 17,000.00
9 Pek. Pas. Mesin Air Ls 1.000 bh 500,000.00
10 Pek. Bak kontrol Ls 2.000 unit 800,000.00
11 Pek. Septicktank & Peresapan ABK-SPT 1.000 unit 17,602,937.32
Sub Jumlah

XII. PEKERJAAN LAIN-LAIN


1 Pembersihan Akhir Pekerjaan Ls 1.000 Unit 1,500,000.00
Sub Jumlah

TOTAL RAB Rp

Bengkulu, 'Desember 2015


Disusun oleh

MARHADI KURNIZA
G1B013051
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

54,898,627 49,907,842.86 55.00%

Jumlah
Harga
( Rp )
6

500,000.00
1,236,564.00
1,736,564.00

2,923,267.20
327,821.56
1,252,375.20
708,960.75
5,212,424.71

39,903,523.91
2,247,531.00
48,386,752.45
4,807,489.41
906,308.54
16,685,939.54
33,740,086.75
5,087,872.62
15,568,789.74
8,603,083.19
1,050,024.45
176,987,401.59 Err:509

427,814.40
836,460.00
46,360,801.44 0.075
27,778,762.75 0.259
85,133,750.00
38,016,612.00
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6

3,076,170.00
7,654,396.20
2,310,000.00

211,594,766.79 6.900
5.190 2.80
5.190
0.091 5.28
6991532.5 0.042 0.10
95,819.54 1.410 2.37
350,414.70 25.292 0.05
2,000,000.00

9,437,766.74
15,001,006.000 262.32

6,523,308.00
18,407,624.04
83,608.53
521,244.00
350,000.00
82,782.00

25,968,566.57

10,306,136.00
10,306,136.00

1,625,960.00
2,192,850.00
1,970,820.00
671,175.00

1,440,000.00
3,650,000.00
2,741,607.00
19,632,412.00

476,453.25
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6

8,097,960.00
16,111,217.47
1,872,000
24,685,630.72
3.75
840,000.00 39.54
585,000.00
225,000.00 57,646.766 258.57
144,000.00
120,000.00
800,000.00 2.350 4.65 10.93
2,714,000.00 3.35 3.85 12.90
2.55 1.85 4.72
-
-
-
350,000.00 342.025 -
12,127,148.00 298.109 -
517,000.00 28.54
1,672,000.00
1,565,373.60 8.560 47.41
7,831,959.40
3,500,000.00
85,000.00
500,000.00
1,600,000.00 14.400 24.87
17,602,937.32 8.650
59,210,602.31 6.350
8.40 2.35 1.85
7.78 2.35 1.54
1,500,000.00 8.80 2.55 1.85
1,500,000.00 14.40 3.35 3.85
9.20
548,986,271.43 86.54

'Desember 2015 60,710,602.307

#REF!
16.600
#REF!
HADI KURNIZA
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6

82.82
31.60
195.68
309.65
237.37
92.24
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
Jumlah
Harga
( Rp )
6

282,095,000.00 282,095,000.00
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

REKAPITULASI
RENCANA ANGGARAN BIAYA ( RAB )

MANAJEMEN KONTRUKSI
PEMBANGUNAN RUMAH DUA LANTAI
LUAS RUMAH 180 m
KOTA BENGKULU

No. JENIS PEKERJAAN JUMLAH HARGA (Rp.)

I. PEKERJAAN PERSIAPAN Rp. 1,736,564.00

II. PEKERJAAN TANAH DAN PASIR Rp. 5,212,424.71

III. PEKERJAAN BETON Rp. 176,987,401.59

IV. PEKERJAAN PASANGAN Rp. 211,594,766.79

V. PEKERJAAN KAYU DAN KACA Rp. 9,437,766.74

VI. PEKERJAAN ATAP Rp. 25,968,566.57

VII. PEKERJAAN PLAPOND Rp. 10,306,136.00

VIII. PEKERJAAN KUNCI DAN BESI PENGGANTUNG Rp. 19,632,412.00

IX. PEKERJAAN PENGECATAN Rp. 24,685,630.72

X. PEKERJAAN INSTALASI LISTRIK Rp. 2,714,000.00

XI PEKERJAAN SANITASI Rp. 59,210,602.31

XII PEKERJAAN LAIN-LAIN Rp. 1,500,000.00

JUMLAH Rp. 548,986,271.43

PPN 10% Rp. 54,898,627.14

TOTAL Rp. 603,884,898.57

DIBULATKAN Rp. 603,884,000.00

Terbilang : Delapan Ratus Lima Puluh Tiga Juta Tiga Ratus Dua Puluh Lima Ribu Rupiah
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI
FAKULTAS TEKNIK
PROGRAM STUDI TEKNIK SIPIL
UNIVERSITAS BENGKULU
MANAJEMEN KONTRUKSI

#REF!

#REF!

#REF! 25,968,566.57

#REF! 211,594,766.79

#REF! 9,437,766.74

#REF! 25,968,566.57

#REF! 548,986,271.43

#REF! 430,937,490.40

#REF! 6,948,988.71

#REF! 183,936,390.30

#REF! 548,986,271.43

#REF! 395,531,157.10

548986271.428

548986271.428

301,640.81

-
MANAJEMEN KONTRUKSI

ESTIMASI PRODUKTIVITAS DAN DURASI PEKERJAAN

MANAJEMEN KONTRUKSI
PEMBANGUNAN RUMAH DUA LANTAI
LUAS RUMAH 180 m
KOTA BENGKULU

Produktivitas/Hari Jumlah Produktivita Volume Durasi (Hari)


No. Jenis Pekerjaan (orang /Volume) Pekerja s perhari Pekerjaan

1 Persiapan
pemasangan bowplank 3
Total 3
2 Civil work dan pondasi
Penggalian 1 :. 2 m3 15 30 m3 101.748 3
Pondasi 1 :. 1 m3 10 10 m3 23.170 2
Timbunan 1 :. 4 m3 6 24 m3 21.000 1
Total 7

3 Balok Sloof
Penulangan 1 :. 25 kg 20 500 kg
> Balok sloof 35/30 926.331
>b alok sloof 15/20 28.051
Total 954.383 2
Bekisting 1 :. 2.5 m2 10 25 m2 35.712 1
Pengecoran 1 :. 0.75 m3 4 3 m3 3.571 1
Bongkar 14
Total 19
3 Kolom Lantai 1
Penulangan 1 :. 25 kg 20 500 kg
> Kolom praktis 122.903
> Kolom Utama 959.357
Total 1082.259 2
Bekisting 1 :. 2.5 m2 15 37.5 m2 37.637 1
Pengecoran 1 :. 0.75 m3 4 3 m3 3.764 1
Bongkar 7
Total 11

4 Balok dan Pelat Lantai


Penulangan 1 :. 25 kg 20 500 kg
> Balok Utama 926.331
> Balok Lantai 45.528
> Pelat 301.743
Total 1273.602 3
Bekisting 1 :. 2.5 m2 10 25 m2 27.044 1
Pengecoran 1 :. 0.75 m3 4 3 m3 2.704 1

MARHADI KURNIZA
G1B012051
MANAJEMEN KONTRUKSI
Bongkar 14
Total 19

Produktivitas/Hari Jumlah Produktivita Volume Durasi (Hari)


No. Jenis Pekerjaan (orang /Volume) Pekerja s perhari Pekerjaan

5 Kolom Lantai 2
Penulangan 1 :. 25 kg 10 250 kg 970.318 4
Bekisting 1 :. 2.5 m2 2 5 m2 0.750 1
Pengecoran 1 :. 0.75 m3 2 1.5 m3 0.075 1
Bongkar 7
Total 13

6 Tangga
Penulangan 1 :. 25 Kg 10 250 Kg 197.610 1
Bekisting 1 :. 2.5 m2 4 10 m2 8.500 1
Pengecoran 1 :. 0.75 m3 2 1.5 m3 0.850 1
Bongkar 7
Total 10
7 Dinding, Kusen lantai I
Dinding 1 :. 0.5 m3 20 10 m3 30.237 3
Kusen pintu dan jendela 1 :. 0.05 m3 15 0.75 m3 0.73 1
Total 4

8 Dinding, Kusen lantai II


Dinding 1 :. 0.5 m3 20 10 m3 35.479 4
Kusen 1 :. 0.05 m3 15 0.75 m3 0.983 1
Total 5

9 Ring Balok
Penulangan 1 :. 25 kg 10 250 kg 465.654 2
Bekisting 1 :. 2.5 m2 2 5 m2 0.700 1
Pengecoran 1 :. 0.75 m3 2 1.5 m3 0.070 1
Bongkar 14
Total 18
10 Atap
Kuda-kuda dan Gording 1 :. 0.5 m3 5 2.5 m3 1.342 1
Kasau ,reng dan bubungan 1 :. 0.5 m3 4 2 m3 1.267 1
Multiroof dan List plank 1 :. 15 m2 8 120 m2 174.297 1
Nok 1 :. 10 m 6 60 m 8.100 1
Total 4

11 Lantai
Pasir Pasang 4 2
Keramik 1 :. 6 m2 12 72 m2 126.234 2
Total 4

12 Plasteran 1 :. 9 m2 20 180 m2 876.214 5

MARHADI KURNIZA
G1B012051
MANAJEMEN KONTRUKSI

Produktivitas/Hari Jumlah Produktivita Volume Durasi (Hari)


No. Jenis Pekerjaan (orang /Volume) Pekerja s perhari Pekerjaan

13 Kamar Mandi
Pasang Keramik 1 :. 5 m2 6 30 m2 23.750 1
Pasang Shower,Kloset 2 2
Septictank,bak penampung lemak, bak kontrol 4 4
Total 7

14 Plafon 1 :. 5 m2 20 100 m2 220.500 2

15 Elektrikal dan mekanikal 2 2

16 Plumbing 6 2

17 Pengecatan dan Finishing


Pemasangan pintu dan jendela 2 2
Pengecetan Dinding 1 :. 30 m2 10 300 m2 733.846 2
Pengecatan kusen+pintu+jendela 1 :. 15 m2 4 60 m2 107.479 2
Pengecetan listplank 1 :. 10 m2 2 20 m2 13.000 1
Pengecatan Plafond 1 :. 30 m2 6 180 m2 376.000 2
Pemasangan kitchen set 2 1
Total 10

18 Landscaping 6 3

Total Durasi 141

MARHADI KURNIZA
G1B012051
KEGIATAN : PEKERJAAN PERUMAHAN REAL-ESTATE
PEKERJAAN : PEMBANGUNAN PERUMAHAN BLOUGRANA
VOLUME : 10 HA / 180 M
LOKASI : 11 HA / 180 M
TAHUN ANGGARAN : 12 HA / 180 M

JUMLAH BOBOT BOBOT


NO. JENIS PEKERJAAN DURASI
(%) HARIAN (%) 1 2

1 PEKERJAAN PERSIAPAN 1,736,564.00 0.32 0.11 3 Hari

2 CIVIL WORK ,PONDASI DAN SLOOF 62,708,196.70 11.42 0.52 22 Hari

3 PEKERJAAN KOLOM LANTAI 1 19,413,979.69 3.54 0.32 11 Hari

4 PEKERJAAN PASANGAN BATU BATA &KUSEN LANTAI 1 37,715,490.09 6.87 1.72 4 Hari

5 PEKERJAAN BALOK & PLAT LANTAI, 67,253,097.64 12.25 0.64 19 Hari

6 PEKERJAAN TANGGA, 4,807,489.41 0.88 0.09 10 Hari

7 PEKERJAAN KOLOM LANTAI 2 19,413,979.69 3.54 0.27 13 Hari

8 PEKERJAAN PASANGAN BATU BATA & KUSEN LANTAI 2 37,715,490.09 6.87 1.37 5 Hari

9 PEKERJAAN PLUMBING 9,482,333.00 1.73 0.86 2 Hari

10 PEKERJAAN SANITASI & DRAINASE 49,728,269.31 9.06 1.29 7 Hari


11 PEKERJAAN RING BALOK 8,603,083.19 1.57 0.09 18 Hari

12 PEKERJAAN ATAP DAN KONSOLE 25,968,566.57 4.73 1.18 4 Hari

13 PEKERJAAN INSTALASI LISTRIK 2,714,000.00 0.49 0.25 2 Hari

14 PEKERJAAN PLAFOND 10,306,136.00 1.88 0.94 2 Hari

15 PEKERJAAN LANTAI DAN PLESTERAN 165,233,965.35 30.10 3.34 9 Hari

16 PEKERJAAN PENGECATAN 24,685,630.72 4.50 0.45 10 Hari

17 PEKERJAAN LAIN - LAIN 1,500,000.00 0.27 0.09 3 Hari

Kemajuan Fisik Per Minggu


RENCANA 548,986,271.43 100.00
Komulatif
2.39 3.63
2.39 6.03
TIME SCHEDULE

JADWAL WAKTU PELAKSANAAN (MINGGU KE- )


3 4 5 6 7 8 9 10
3.63 3.04 2.25 3.87 4.51 3.96 0.61 1.54
9.66 12.70 14.95 18.82 23.34 27.29 27.90 29.44
JADWAL WAKTU PELAKSANAAN (MINGGU KE- )
10 11 12 13 14 15 16 17 18 19
1.54 1.90 9.89 13.25 4.49 0.61 24.80 11.83 2.79 0.18
29.44 31.34 41.23 54.49 58.98 59.59 84.38 97.03 99.82 100.00
KEGIATAN : PEKERJAAN PERUMAHAN REAL-ESTATE
PEKERJAAN : PEMBANGUNAN PERUMAHAN BLOUGRANA
VOLUME : 10 HA / 180 M
LOKASI : 11 HA / 180 M
TAHUN ANGGARA : 12 HA / 180 M

JUMLAH BOBOT
NO. JENIS PEKERJAAN
(%)
1 PEKERJAAN PERSIAPAN 1,736,564.00 Err:508
2 CIVIL WORK ,PONDASI DAN SLOOF 151,353,752.10 Err:508
3 PEKERJAAN KOLOM LANTAI 1 19,413,979.69 Err:508
4 PEKERJAAN PASANGAN BATU BATA &KUSEN LANTAI 1 Err:508 Err:508
5 PEKERJAAN BALOK & PLAT LANTAI, 65,005,566.64 Err:508
6 PEKERJAAN TANGGA, 8,457,489.41 Err:508
7 PEKERJAAN KOLOM LANTAI 2 19,413,979.69 Err:508
8 PEKERJAAN PASANGAN BATU BATA & KUSEN LANTAI 2 Err:508 Err:508
9 PEKERJAAN PLUMBING 10,009,557.58 Err:508
10 PEKERJAAN SANITASI & DRAINASE 42,519,085.32 Err:508
11 PEKERJAAN RING BALOK 8,603,083.19 Err:508
12 PEKERJAAN ATAP DAN KONSOLE 25,968,566.57 Err:508
13 PEKERJAAN INSTALASI LISTRIK 2,714,000.00 Err:508
14 PEKERJAAN PLAFOND 10,306,136.00 Err:508
15 PEKERJAAN LANTAI DAN PLESTERAN Err:509 Err:509
16 PEKERJAAN PENGECATAN 24,685,630.72 Err:508
17 PEKERJAAN LAIN - LAIN 1,500,000.00 Err:508
Kemajuan Fisik Per Minggu Err:508
RENCANA
Komulatif Err:508
TIME SCHEDULE

BOBOT JADWAL WAKTU PELAKSANAAN (MING


DURASI
HARIAN (%) 1 2 3 4 5 6 7 8 9
Err:508 3 Hari
Err:508 19 Hari
Err:508 11 Hari
Err:508 4 Hari
Err:508 19 Hari
Err:508 10 Hari
Err:508 13 Hari
Err:508 5 Hari
Err:508 2 Hari
Err:508 7 Hari
Err:508 18 Hari
Err:508 4 Hari
Err:508 2 Hari
Err:508 2 Hari
Err:509 9 Hari
Err:508 10 Hari
Err:508 3 Hari
141

Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508


Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
DULE

PELAKSANAAN (MINGGU KE- )


9 10 11 12 13 14 15 16 17
100

75

50

25

Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:509 Err:508 Err:508


Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
100

75
### -
-
-
-
-
-
-
-
-
-
Bak kamar mandi PVC
-

Anda mungkin juga menyukai