ENGINEERING ESTIMATE (EE)

PERENCANAAN PEMBANGUNAN KOST


PEKERJAAN :
PAK BOB

DESA TIWATOBI- KEC. ILE MANDIRI


LOKASI :
- KAB. FLORES TIMUR

TA : 2022
REKAPITULASI
PEKERJAAN : PERENCANAAN PEMBANGUNAN KOST

LOKASI : DESA TIWATOBI- KEC. ILE MANDIRI

TAHUN ANGGARAN : 2022

NO. URAIAN PEKERJAAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN Rp 3.650.000,00


II. PEKERJAAN TANAH DAN PONDASI Rp 27.136.868,69
III. PEKERJAAN BETON Rp 76.806.933,10
IV. PEKERJAAN DINDING DAN PLESTERAN Rp 67.583.060,17
V. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp 22.824.804,26
VI. PEKERJAAN LANGIT - LANGIT (PLAFOND) Rp 7.095.797,28
VII. PEKERJAAN KUDA - KUDA DAN PENUTUP ATAP Rp 16.151.711,98
VIII. PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN BOVEN Rp 136.649.286,04
IX. PEKERJAAN PENGECETAN Rp 9.916.684,46
X. PEKERJAAN ELEKTRIKAL Rp 36.881.356,00
XI. PEKERJAAN SEPTITANCK DAN PERESAPAN Rp 3.688.135,00

1. JUMLAH TOTAL Rp 408.384.636,99


2. PPn 11 % ( 1 x 11% ) Rp 44.922.310,07
3. TOTAL JUMLAH ( 1 + 2 ) Rp 453.306.947,06
DIBULATKAN Rp 453.300.000,00

EMPAT RATUS LIMA PULUH TIGA JUTA TIGA RATUS RIBU RUPIAH

Larantuka, Agustus 2022


Dibuat Oleh :
Perencana

Perencana
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : PERENCANAAN PEMBANGUNAN KOST
LOKASI : DESA TIWATOBI- KEC. ILE MANDIRI
TAHUN ANGGARAN : 2022

HARGA SATUAN JUMLAH HARGA


NO. ITEM PEKERJAAN SAT. KUANTITAS
(Rp.) (Rp.)
1 2 3 4 5 6=4x5
I. PEKERJAAN PERSIAPAN
2 Pembersihan Lokasi Ls 1,000 300.000,00 300.000,00
3 Pengukuran dan Pemasangan Bouwplank Ls 1,000 350.000,00 350.000,00
5 Penyedian Air Kerja Ls 1,000 2.500.000,00 2.500.000,00
7 Pembersihan Akhir Pekerjaan Ls 1,000 500.000,00 500.000,00

TOTAL PEKERJAAN I. 3.650.000,00


II. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah M³ 39,600 63.888,00 2.529.964,80
2 Urugan Pasir dibawah Pondasi M³ 5,040 138.698,06 699.038,21
3 Pas. Aanstamping M³ 8,400 415.906,78 3.493.616,94
4 Pas. Pondasi Batu Belah; Camp. 1 Pc : 5 Psr M³ 21,222 816.001,61 17.317.390,11
5 Urugan Tanah Kembali Bekas Galian M³ 19,800 46.706,00 924.778,80
6 Urugan Tanah Peninggi Lantai M³ 5,184 174.210,14 903.105,38
7 Pas. Dinding Tangga Bata Merah 1/2 Batu; Camp. 1 Pc : 5 Psr M² 2,041 152.783,87 311.862,44
8 Plesteran Dinding Pondasi dan Tangga; Camp. 1 Pc : 5 Psr t : 20 mm M² 12,621 75.834,88 957.112,02

TOTAL PEKERJAAN II. 27.136.868,69


III. PEKERJAAN BETON
1 Sloof 13/20 Cm
- Beton K-175 M³ 2,550 1.595.779,41 4.069.237,50
- Pembesian (Tul. Utama 4 Ø 10; Sengkang Ø 6 - 150 Cm ) Kg 328,950 17.408,49 5.726.523,77
- Bekisting (2 Kali Pakai) M² 19,615 260.731,90 5.114.356,50
3 Ringbalk 10/20 Cm
- Beton K-175 M³ 1,700 1.595.779,41 2.712.825,00
- Pembesian (Tul. Utama 4 Ø 10; Sengkang Ø 6 - 150 Cm ) Kg 277,100 17.408,49 4.823.893,41
- Bekisting M² 17,000 475.441,45 8.082.504,65
4 Balok Gewel 10/20 Cm
- Beton K-175 M³ 0,413 1.595.779,41 658.737,74
- Pembesian (Tul. Utama 4 Ø 10; Sengkang Ø 6 - 150 Cm ) Kg 67,286 17.408,49 1.171.354,82
- Bekisting M² 4,128 475.441,45 1.962.622,31
5 Kolom 15/15 cm
- Beton K-175 M³ 1,275 1.595.779,41 2.034.618,75
- Pembesian (Tul. Utama 4 Ø 10; Sengkang Ø 6 - 150 Cm ) Kg 265,200 17.408,49 4.616.732,34
- Bekisting M² 12,750 475.441,45 6.061.878,49
6 Rabat Beton Non Struktur K-125 (Dalam Bangunan dan tangga ) M³ 10,521 1.506.440,58 15.849.110,71

TOTAL PEKERJAAN III. 76.806.933,10


IV. PEKERJAAN DINDING DAN PLESTERAN
1 Pas. Dinding Batako Lubang (5x20x40) cm; Camp. 1 Pc : 5 Psr M² 251,550 152.783,87 38.432.782,86
2 Plesteran Dinding; Camp. 1 Pc : 5 Psr t : 15 mm M² 301,860 56.643,89 17.098.523,77
3 Acian (Dinding dan Beton) M² 353,040 34.137,13 12.051.753,54

TOTAL PEKERJAAN IV. 67.583.060,17


HARGA SATUAN JUMLAH HARGA
NO. ITEM PEKERJAAN SAT. KUANTITAS
(Rp.) (Rp.)
1 2 3 4 5 6=4x5
V. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pas. Lantai Keramik 40 x 40 Cm; Putih Polos/Slip M² 95,200 227.311,46 21.640.051,40
2 Pas. Lantai Keramik 40 x 40 Cm pada Tangga; Warna/Corak/Anti Slip M² 4,960 238.861,46 1.184.752,86

TOTAL PEKERJAAN V. 22.824.804,26


VI. PEKERJAAN LANGIT - LANGIT (PLAFOND)
1 Pas. Rangka penutup Plafon Kalsiboard 4,5 mm M² 14,400 492.763,70 7.095.797,28

TOTAL PEKERJAAN VI. 7.095.797,28


VII. PEKERJAAN KUDA - KUDA DAN PENUTUP ATAP
1 Pas. Kuda - Kuda Baja Ringan M³ 0,445 8.334.480,00 3.707.910,14
2 Pas. Gording; Baja Ringan M³ 0,417 7.586.876,00 3.163.727,29
3 Pas. Listplank kayu Kls. II Lebar 30cm ( 2 x 2,5/20) M¹ 82,000 93.210,70 7.643.277,40
9 Pas. Seng Spandek M² 14,140 107.460,10 1.519.485,81
10 Pas. Bubungan Seng Pelat L 40 M¹ 3,900 30.079,83 117.311,34

TOTAL PEKERJAAN VII. 16.151.711,98


VIII. PEKERJAAN KUSEN, DAUN PINTU JENDELA DAN BOVEN
1 Pas. Kusen Pintu dan Jendela; Kayu Kelas I (5/11) M³ 2,578 22.369.325,00 57.668.835,67
2 Pas. Daun Pintu Panel; Kayu Jati M² 27,274 790.625,00 21.563.822,50
3 Pas. Daun Jendela Kaca Polos 5 mm; Kayu Jati M² 59,334 783.398,00 46.481.823,57
6 Pas. Kunci Tanam Biasa Bh 2,000 265.719,30 531.438,60
7 Pas. Engsel Pintu Bh 36,000 45.402,24 1.634.480,50
8 Pas. Grendel Pintu Bh 4,000 46.800,00 187.200,00
9 Pas. Engsel Jendela dan Boven Bh 120,000 39.430,71 4.731.685,20
10 Pas. Grendel Jendela dan Boven Bh 60,000 30.000,00 1.800.000,00
11 Pas. Kait Angin Bh 90,000 15.000,00 1.350.000,00
12 Anker Kusen Pintu, Jendela, dan Bouven Ls 1,000 500.000,00 500.000,00
13 Pas. Neut Beton Ls 1,000 200.000,00 200.000,00

TOTAL PEKERJAAN VIII. 136.649.286,04


IX. PEKERJAAN PENGECETAN
1 Residu Rangka Atap Ls 1,000 150.000,00 150.000,00
2 Pengecatan Kusen Pintu dan Jendela M² 43,500 62.956,08 2.738.589,48
3 Pengecatan Daun Pintu Panel dan Daun Jendela Kaca M² 35,892 62.956,08 2.259.619,62
4 Pengecatan Listplank M² 24,600 35.905,87 883.284,40
5 Pengecatan Dinding Tembok dan Beton (Cat Matex) M² 168,000 21.300,39 3.578.465,35
6 Pengecatan Plafon (Cat Matex) M² 14,400 21.300,39 306.725,60

TOTAL PEKERJAAN IX. 9.916.684,46


X. PEKERJAAN ELEKTRIKAL
1 Pas. Meter Baru 2200 VA Bh 6,000 5.500.000,00 33.000.000,00
1 Pas. MCB 6 A Bh 1,000 75.000,00 75.000,00
2 Box MCB 2 Lubang Bh 1,000 120.000,00 120.000,00
3 Pemasangan Titik Instalasi Listrik Titik 8,000 298.919,50 2.391.356,00
4 Lampu Philips LED 19 Watt Bh 8,000 125.000,00 1.000.000,00
5 Stop Kontak Bh 4,000 30.000,00 120.000,00
7 Saklar Ganda Bh 5,000 35.000,00 175.000,00

TOTAL PEKERJAAN X. 36.881.356,00


DAFTAR HARGA UPAH DAN BAHAN

HARGA SATUAN
NO. URAIAN KODE SATUAN KETERANGAN
( Rp. )

A. TENAGA

1 Mandor L.01 OH 112.200,00


2 Kepala Tukang L.02 OH 101.300,00
3 Tukang Batu L.03 OH 90.400,00
4 Tukang Kayu L.04 OH 90.400,00
5 Tukang Besi/Baja L.05 OH 90.400,00
SK Bupati Flores Timur
6 Tukang Khusus Aluminuim L.06 OH 90.400,00
No. 280 Tahun 2021
7 Tukang Cat L.07 OH 90.400,00
8 Tukang Listrik L.08 OH 90.400,00
9 Tukang Pipa L.09 OH 90.400,00
10 Tukang Las L.010 OH 90.400,00
11 Pekerja / Buruh Tak Terlatih L.011 OH 73.700,00

HARGA SATUAN
NO. URAIAN KODE SATUAN KETERANGAN
( Rp. )

B. BAHAN

AGREGAT KASAR, BAHAN PEREKAT & BAHAN JADINYA


1 Pasir Urug M.01 m3 85.714,29
2 Tanah Urug Pilihan M.02 m3 114.285,71
3 Sirtu M.03 m3 114.285,71
4 Pasir Pasang M.04 m3 171.428,57
5 Pasir Beton M.05 m3 171.428,57
6 Batu Pecah Mesin 2/3 M.06 m3 857.142,86
7 Batu Pecah Mesin 3/5 M.07 m3 714.285,71
8 Batu Pecah Mesin 5/7 M.08 m3 571.428,57
9 Batu Belah Pondasi M.09 m3 200.000,00
10 Batu Roaster 15 x 20 M.010 bh 35.000,00
11 Bata Merah M.011 bh 1.100,00
Batako M.0 bh 6.000,00
12 Semen PC / 40 kg M.012 zak 63.000,00
M.0 1.575,00
13 Semen Putih M.013 zak 92.700,00
14 Semen Warna M.014 kg 15.700,00
15 Air M.015 ltr 150,00

LABURAN, PENGISI DAN ALATNYA


16 Plamir Tembok M.016 kg 15.000,00
17 Cat Tembok Eksterior M.017 kg 69.000,00 Kualitas Setara ex. Dulux dan
18 Cat Tembok Interior ( Plafon Dan Dinding ) M.018 kg 60.000,00 Nippon Pain (Matex)
19 Cat Matex M.019 kg 27.000,00
20 Kwas 3" M.020 bh 25.000,00
21 Politur M.021 kg 65.000,00
22 Teak oil M.022 kg 48.000,00
23 Plamuur M.023 kg 15.000,00
24 Tiner A M.024 kg 45.000,00
25 Tiner B M.025 kg 40.000,00
26 Ampelas M.026 lbr 8.000,00
27 Vernis M.027 lt 24.400,00
28 Dempul Kayu Cap Kucing M.028 kg 60.000,00
29 Meni Kayu / Besi M.029 kg 40.000,00
30 Cat Kayu Sieve M.030 kg 68.000,00
31 Cat Besi M.031 lt 65.000,00
32 Karet lis M.032 bh 3.300,00
33 Residu M.033 lt 8.100,00

BAHAN KAYU BERIKUT BAHAN JADINYA


32 Kayu Balok Klas I M.032 m3 16.000.000,00
33 Kayu Papan Klas I M.033 m3 16.000.000,00
34 Kayu Balok Klas II M.034 m3 5.000.000,00
Kualitas Setara Meranti Merah
35 Kayu Papan Klas II M.035 m3 5.000.000,00
36 Kayu Balok Klas III M.036 m3 3.500.000,00
37 Kayu Papan Klas III M.037 m3 3.500.000,00
38 Kayu Jati M.038 m3 8.000.000,00
39 Dolken M.039 btg 30.000,00
40 List Profil 1x4 cm M.040 m1 20.000,00
41 Ijuk M.041 kg 37.500,00

BAHAN KAYU LAPIS


42 Triplek 3 mm 120 x 240 M.042 lbr 64.000,00
43 Triplek 4 mm 120 x 240 M.043 lbr 74.000,00
44 Triplek 9 mm 120 x 240 M.044 lbr 108.000,00
45 Listplank GRC (Woodplank) M.045 m' 26.250,00
46 Teak Wood ukuran Pintu 4 mm M.046 lbr 144.700,00
47 Kalsiboard M.047 lbr 965.000,00
48 Formika 120 x 240 M.048 lbr 170.000,00
BAHAN LANTAI DAN PELAPIS DINDING
49 Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip M.049 m2 90.000,00
50 Keramik 20 x 20 KW I DN Corak/Warna/Slip M.050 m2 80.000,00
51 Keramik 40 x 40 KW I DN Polos Roman M.051 m2 80.000,00
Kualitas Standar Platinum / Roman
52 Keramik 40 x 40 KW I DN Warna/Corak/Anti Slip M.052 m2 90.000,00
/ KIA
53 Keramik 30 x 30 KW I DN Polos Roman M.053 m2 80.000,00
54 Keramik 30 x 30 KW I DN Warna/Corak/Anti Slip M.054 m2 90.000,00
55 Keramik 20 x 40 KW I DN Warna/Corak Batu Alam/Anti Slip M.055 bh 95.000,00

BAHAN SALURAN AIR KOTOR / BERSIH


56 Injuk M.056 kg 17.400,00
57 Pipa Hawa (PVC) 2 Meter M.057 bh 150.000,00

BAHAN LOGAM DAN BAHAN JADINYA


58 Besi Beton Rata-rata M.058 kg 13.410,87
59 Kawat Beton M.059 kg 32.000,00
60 Kawat Las Listrik M.060 kg 23.600,00
61 Plat Strip M.061 Bh 18.200,00
62 Besi Strip M.062 Bh 26.800,00
63 Lem Kuning ( Aibond ) M.063 kg 35.700,00
64 Lem Fox M.064 kg 23.900,00
65 Lem Vinyl M.065 kg 44.000,00
66 Besi Hallow ( 2 x 4 x 4) cm ( 400 cm ) M.066 m1 22.600,00 Kualitas Standar Galvalum /
67 Besi Hallow ( 4 x 4 x 4) cm ( 400 cm ) M.067 m1 29.200,00 Galvanise
68 Spancer M.068 Bh 20.000,00
69 Pintu Jadi KM/WC M.069 Bh 1.000.000,00

BAHAN KACA
70 Kaca Polos 3 mm M.070 m2 150.000,00
71 Kaca Polos 5 mm M.071 m2 195.000,00
72 Sealant M.072 Tube 211.800,00

BAHAN PAKU DAN MUR BAUT


73 Paku 1/2" s/d 2" M.073 kg 27.000,00
74 Paku > 5 cm M.074 kg 27.000,00
75 Paku Beton 2 cm s/d 5 cm M.075 bh 1.600,00
76 Paku Kait Lengkap M.076 bh 900,00
77 Paku Seng M.077 kg 57.100,00
78 Besi Beugel Kuda - Kuda M.078 kg 21.700,00
79 Angker Mur Baut dia. 12 / Panjang 30 cm M.079 bh 71.800,00
80 Mur Baut Biasa dia. 12 ( 35 cm ) M.080 bh 16.500,00
81 Mur Baut Biasa dia. 12 ( 25 cm ) M.081 bh 13.500,00
82 Mur Baut Biasa dia. 12 ( 15 cm ) M.082 bh 9.500,00
83 Baut Biasa M.083 bh 2.500,00
84 Paku skrup 3" M.084 kg 800,00
85 Ramset / Dinabolt M.085 bh 7.200,00
86 Paku GRC M.086 kg 35.000,00
87 Paku gypsum M.087 kg 55.500,00
88 Spancer M.088 bh 15.500,00

BAHAN PERPIPAAN
89 Pipa GIP Ø 1/2" - Medium A M.089 m1 25.833,33
90 Tee GIP Ø 1/2'' M.090 bh 5.355,00
91 Elbow GIP Ø 1/2'' M.091 bh 7.000,00
92 Socket GIP 1/2 " M.092 bh 3.570,00
93 Pipa PVC type AW 1/2" M.093 bh 17.500,00
Kualitas Standar ex Maspion /
94 Pipa PVC type AW 3" M.094 m1 42.500,00
Rucika
95 Pipa PVC type AW 4" M.095 m1 61.250,00
96 Tee PVC Ø 4'' M.096 bh 35.000,00
97 Tee PVC Ø 3'' M.097 bh 30.000,00
98 Elbow 90 PVC Ø 4'' M.098 bh 35.000,00
99 Elbow 90 PVC Ø 3'' M.099 bh 30.000,00
100 Lem Paralon M.0100 tb 10.100,00
101 Solatip Ledeng M.0101 bh 5.000,00

BAHAN SANITAIR
102 Stop Kran 1/2" KIT M.0102 bh 55.000,00
103 Floor Drain M.0103 bh 39.000,00
104 Wastafel Lengkap INA (Ukuran Sedang) M.0104 unit 650.000,00
105 Closet Jongkok Poslin Warna TOTO M.0105 unit 205.600,00
106 Closet Jongkok Standard Putih Poslin TOTO M.0106 unit 188.200,00
107 Closet Duduk Warna Standard INA Lengkap M.0107 bh 1.272.100,00
108 Stop Kran Westafel 1/2" M.0108 bh 250.000,00

BAHAN PENUTUP ATAP


109 Seng Plastik M.0109 m' 33.100,00
110 Atap Seng Gelombang BJLS 3 mm M.0110 lbr 90.000,00
111 Atap Seng Galvalum 0,35 mm ( 4 m ) M.0111 lbr 150.000,00
112 Atap Seng Galvalum 0,35 mm ( 6 m ) M.0112 lbr 250.000,00
113 Seng Pelat L 40 M.0113 lbr 25.000,00
BAHAN ELEKTRIKAL
114 Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' ) M.0114 m' 4.900,00
115 Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' ) M.0115 m' 10.900,00
116 Rumah Panel 30 x 60 cm ( Kosong ) M.0116 unt 153.500,00
117 Meteran Listrik @1300 KWA M.0117 Ls 3.500.000,00
118 MCB 6 Amper M.0118 bh 75.000,00
119 Box MCB 1 Lubang M.0119 bh 120.000,00
120 Saklar Broko Tunggal Standard ( 1 Phase ) M.0120 bh 28.000,00
121 Saklar Broko Seri Standard ( 1 Phase ) M.0121 bh 35.000,00
122 Stop Kontak Broko Standard ( 1 Phase ) M.0122 bh 30.000,00
123 Stop Kontak Broko 3 Phase (Out Bow) M.0123 bh 35.000,00
124 Stop Kontak Broko 3 Phase ( In Bow) M.0124 bh 49.000,00
125 Stop Kontak Handle 3 Phase M.0125 bh 87.800,00
126 Lampu LED 24 Watt M.0126 bh 125.000,00 Kualitas Standar ex Philips
127 Pipa Listrik 5/8” M.0127 btg 39.100,00
128 Fitting M.0128 bh 307.600,00
129 Klem M.0129 bh 2.500,00

BAHAN ALAT PENGANTUNG DAN KUNCI


130 Kunci Tanam Pintu Pull Handle M.0130 bh 235.000,00
131 Tarikan/ Pull Handle Pintu M.0131 bh 550.000,00
132 Kunci Tanam Pintu Panel Merk Yuri M.0132 bh 190.000,00
133 Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226 M.0133 bh 335.900,00
134 Kunci 2 Slaag Ancor Asli M.0134 bh 165.300,00
135 Kunci 2 Slaag ISO M.0135 bh 207.300,00
136 Kunci KM Bulat Kualitas Biasa M.0136 bh 54.400,00
137 Kunci kM Bulat ALFA M.0137 bh 102.700,00
138 Kunci 2 Slaag Silinder Utama Standard M.0138 bh 586.600,00
139 Kunci Gembok Besar M.0139 bh 85.200,00
140 Kunci 2 Slaag Kuda Terbang M.0140 bh 94.500,00
141 Kunci Lemari M.0141 bh 46.800,00
142 Grendel 15 cm M.0142 bh 49.800,00
143 Grendel 5 cm M.0143 bh 30.000,00
144 Hak Angin Kait Jendela Biasa M.0144 ps 15.000,00
145 Hak Angin Jendela Antik M.0145 ps 29.000,00
146 Hak Angin Sendok Stainless / Kuningan M.0146 bh 32.200,00
147 Sping Knip Stainless / Kuningan M.0147 bh 32.200,00
148 Sloot Pintu Berikut Rantai M.0148 bh 31.500,00
149 Sloot Jendela Tunggal M.0149 bh 33.000,00
150 Engsel Pintu Unilon Standard M.0150 ps 25.000,00
151 Engsel Jendela Unilon M.0151 ps 25.000,00
152 Engsel Patrun M.0152 ps 30.000,00
153 Engsel Harmonika M.0153 m1 15.000,00
154 Door Closer Kelas Standard ( Kelas Sedang ) M.0154 unt 420.000,00
155 Door Closer Kelas Standard ( Kelas Baik ) M.0155 unt 597.500,00
156 Door Closer Kelas Rendah M.0156 unt 200.000,00
157 Door Holder M.0157 unt 205.400,00
158 Door Stoper M.0158 unt 255.500,00
159 Waterstop Lebar 200 mm M.0159 m1 57.900,00

BAHAN PENGISAP AIR SUMUR DALAM


160 Mesin Pompa Air 100 W - Sanyo M.0160 unit 1.200.000,00

BAHAN PENAMPUNG AIR


161 Bak KM Fiber 60 x 60 M.0161 bh 255.300,00
162 Bak Taraso WC 40 x 40 M.0162 bh 118.500,00
163 Bak KM Taraso 60 x 60 M.0163 bh 161.100,00
164 Profil tank 1200 Liter M.0164 bh 1.500.000,00
165 Profil tank 2200 Liter M.0165 bh 2.500.000,00

BAHAN BAKAR DAN PELUMAS


166 Minyak Solar M.0166 lt 12.000,00
167 Bensin Premium M.0167 lt 10.800,00
168 Oil Mesran 40 SAE M.0168 lt 55.000,00
169 Minyak Bekisting M.0169 ltr 40.500,00
170 Kawat Las M.0170 bh 1.400,00
REKAPITULASI ANALISA HARGA SATUAN
PERMEN PUPR NOMOR 1 TAHUN 2022
HARGA SATUAN
NO. JENIS PEKERJAAN
(Rp.)

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A. 2.2.1.4. Pengukuran dan pemasangan 1 m1 Bouwplank Rp 124.876,40
A. 2.2.1.9. Pembersihan 1 m2 lapangan dan perataan Rp 14.278,00
A. 2.2.1.13. Pembongkaran 1 m3 beton bertulang Rp 1.163.185,10
A. 2.2.1.13. Pembongkaran 1 m3 beton Rp 581.592,55
A. 2.2.1.14. Pembongkaran 1 m3 dinding tembok bata Rp 581.592,55

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


A.2.3.1.1. Menggali 1 m3 tanah biasa sedalam 1 m Rp 63.888,00
A.2.3.1.2. Menggali 1 m3 tanah biasa sedalam 2 m Rp 78.516,90
A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m Rp 85.019,44
A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 2 m Rp 129.010,20
A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m Rp 102.837,90
A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah Rp 46.706,00
A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug Rp 138.698,06
A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan Rp 261.511,80
A.2.3.1.14. Pengurugan 1 m3 sirtu padat Rp 174.210,14

A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP Rp 919.220,89
A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Rp 858.253,39
A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP Rp 816.001,61
A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) Rp 415.906,78
A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm Rp 1.232.917,81

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1. Membuat 1 m3 Beton Mutu f’c = 7,4 Mpa (K100) Rp 1.452.641,17
A.4.1.1.2. Membuat 1 m3 Beton Mutu f’c = 9,8 Mpa (K125) Rp 1.506.440,58
A.4.1.1.5. Membuat 1 m3 Beton Mutu f’c = 14,5 Mpa (K175) Rp 1.595.779,41
A.4.1.1.8. Membuat 1 m3 Beton Mutu f’c = 21,7 Mpa (K250) Rp 1.694.089,36
A.4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir Rp 174.084,93
Pembesian 1 kg dengan besi polos atau besi ulir Rp 17.408,49
A.4.1.1.19. Pemasangan 1 m2 Bekisting untuk Sloof Beton Bangunan Gedung Rp 260.731,90
A.4.1.1.20. Pemasangan 1 m2 Bekisting untuk Kolom Beton Bangunan Gedung Rp 458.941,45
A.4.1.1.21. Pemasangan 1 m2 Bekisting untuk Balok Bangunan Gedung Rp 475.441,45
A.4.1.1.22. Pemasangan 1 m2 Bekisting untuk Plat lantai Beton Bangunan Gedung Rp 590.941,45
A.4.1.1.23. Pemasangan 1 m2 Bekisting untuk Dinding Sheerwall Rp 549.141,45
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.2. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal 1 Batu dengan Mortar tipe S,fc’ 12, 5 Mpa (Setara Campuran 1SP : 3PP) Rp 318.107,08
A.4.4.1.3. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan Mortar tipe N,fc’ 5,2 Mpa (Setara Campuran 1SP : 4PP) Rp 307.396,22
A.4.4.1.4. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu dengan Mortar tipe O, fc’ 2,4 Mpa ( Setara Campuran 1SP : 5PP) Rp 301.556,99
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1SP : 6PP Rp 298.918,16
A.4.4.1.8. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ Batu dengan Mortar tipe S, fc’ 12, 5 Mpa (Setara Campuran 1SP : 3PP) Rp 154.369,48
A.4.4.1.9. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm Tebal ½ Batu dengan Mortar tipe N,fc’ 5,2 Mpa (Setara Campuran 1SP : 4PP) Rp 149.962,92
A.4.4.1.10. Pemasangan 1m2 Dinding Batako Lubang (5x20x40)cm Tebal ½ Batu dengan Mortar tipe O, fc’ 2,4 Mpa (Setara Campuran 1SP : 5PP) Rp 152.783,87
A.4.4.1.11. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 6PP Rp 145.585,00
Pemasangan 1m2 dinding bata kosong (5x11x22) cm tebal 1 batu Rp 206.630,60

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


A.4.4.2.3. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15mm Rp 60.568,81
A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm Rp 58.096,26
A.4.4.2.5. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 15 mm Rp 56.643,89
A.4.4.2.6. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 15 mm Rp 55.501,90
A.4.4.2.14. Pemasangan 1 m2 plesteran 1SP : 3PP tebal 20 mm Rp 68.607,53
A.4.4.2.15. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 20 mm Rp 77.708,53
A.4.4.2.16. Pemasangan 1 m2 plesteran 1SP : 5PP tebal 20 mm Rp 75.834,88
A.4.4.2.17. Pemasangan 1 m2 plesteran 1SP : 6PP tebal 20 mm Rp 74.249,37
A.4.4.2.27. Pemasangan 1 m2 acian Rp 34.137,13

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


A.4.4.3.35. Pemasangan 1m2 Dinding Keramik Ukuran 20 s.d. <40cm - Anti Slip Rp 291.014,59
A.4.4.3.35. Pemasangan 1m2 Lantai Keramik Ukuran 20 s.d. <30cm - Slip Rp 227.311,46
A.4.4.3.36. Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm - Anti Slip Rp 238.861,46
A.4.4.3.36. Pemasangan 1m2 Lantai Keramik Ukuran 30 s.d. <40cm - Slip Rp 227.311,46
A.4.4.3.39. Pemasangan 1m2 Plint Keramik Ukuran 10 s.d. <20cm - Slip Rp 1.131.435,56
A.4.4.3.49. Pemasangan 1 m2 Dinding Porselen 20cm x 20cm Rp 2.483.542,84

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.5. Pemasangan 1 m2 Langit-Langit Kayu Lapis, Tebal 3 mm, 4 mm dan 6 mm Rp 47.073,40
A.4.5.1.10. Pemasangan 1 m’ List Langit-Langit Kayu profil Rp 28.923,40

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.40. Pemasangan 1 m2 Atap Seng BJLS 0.30 mm Rp 107.460,10
A.4.5.2.42. Pemasangan 1 m2 Atap Aluminium Gelombang 95cm x 180cm Rp 215.006,66
A.4.5.2.43. Pemasangan 1 m’ Nok/Bubung Atap Aluminium Gelombang Rp 30.079,83
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.1. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Rp 22.369.325,00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I Rp 1.142.625,00
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu Jati Rp 790.625,00
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I Rp 783.398,00
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I Rp 1.565.025,00
A.4.6.1.8. Pembuatan 1 m2 Daun pintu tripleks Rangkap, Rangka Kayu Kelas II Tertutup (Lebar Sampai 90 cm) Rp 707.528,80
A.4.6.1.10. Pemasangan 1 m2 jalusi kusen, kayu kelas I Rp 1.377.283,60
A.4.6.1.12. Pembuatan 1 m2 Tripleks Rangkap Lapis Formika, Rangka Kayu Kelas II Rp 700.910,21
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas II Rp 8.334.480,00
A.4.6.1.14. Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I Rp 24.535.753,00
A.4.6.1.15. Pemasangan 1 m3 konstruksi gordeng, kayu kelas II Rp 7.586.876,00
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas III Rp 119.821,90
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II Rp 147.698,10
A.4.6.1.21. Pemasangan 1 m1 lisplank Kayu Kls. II Lebar 30cm ( 2 x 2,5/20) Rp 93.210,70
A.4.6.1.22. Pemasangan 1 m1 lisplank Papan GRC ( Woodplank) Rp 61.200,70
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II Rp 221.365,21
A.4.6.1.25. Pemasangan 1 m2 Dinding Pemisah tripleks Rangkap, Rangka Kayu Kelas II Rp 293.481,21
A.4.6.1.26. Pemasangan 1 m2 dinding lambrisering dari papan kayu kelas I Rp 377.696,00

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.2. Pemasangan 1 buah kunci tanam biasa Rp 265.719,30
A.4.6.2.5. Pemasangan 1 buah engsel pintu Rp 45.402,24
A.4.6.2.6. Pemasangan 1 buah engsel jendela kupu-kupu Rp 39.430,71
A.4.6.2.7. Pemasangan 1 buah engsel angin Rp 63.285,31
A.4.6.2.8. Pemasangan 1 buah spring knip Rp 54.210,86
A.4.6.2.9. Pemasangan 1 buah kait angin Rp 54.210,86
A.4.6.2.11. Pemasangan 1 buah kunci slot Rp 232.861,42
A.4.6.2.16. Pemasangan 1 m2 kaca tebal 3 mm Rp 211.051,24
A.4.6.2.17. Pemasangan 1 m2 kaca tebal 5 mm Rp 265.501,24

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat penutup) Rp 62.956,08
A.4.7.1.6. Pelaburan 1 m2 bidang kayu dengan teak oil Rp 35.905,87
A.4.7.1.7. Pelaburan 1 m2 bidang kayu dengan politur Rp 66.285,34
A.4.7.1.8. Pelaburan 1 m2 bidang kayu dengan cat residu dan ter Rp 11.966,02
A.4.7.1.9. Pelaburan 1 m2 bidang kayu dengan vernis Rp 39.240,74
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Rp 21.300,39
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Rp 24.510,71
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup) Rp 22.728,71
A.4.7.1.16. Pengecatan 1 m2 permukaan baja dengan menie besi Rp 28.721,55
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir Rp 121.709,50
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. Pemasangan 1 buah closet duduk Rp 1.881.045,10
A.5.1.1.2. Pemasangan 1 buah closet jongkok Rp 505.132,41
A.5.1.1.3. Pemasangan 1 buah closet jongkok teraso Rp 480.886,21
A.5.1.1.5. Pemasangan 1 buah wastafel Rp 1.238.832,41
A.5.1.1.10. Pemasangan 1 buah bak air fiberglass vol 1 m3 Rp 390.464,25
A.5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel Rp 355.358,30
A.5.1.1.14. Pemasangan 1 buah floor drain Rp 55.386,10
A.5.1.1.18. Pemasangan 1 m’ pipa PVC diameter ½" Rp 24.024,33
A.5.1.1.19. Pemasangan 1 buah kran diameter ½" atau ¾" Rp 106.298,50
A.5.1.1.31. Pemasangan 1 m’ pipa PVC tipe AW diameter 3" Rp 97.724,06
A.5.1.1.32. Pemasangan 1 m’ pipa PVC tipe AW diameter 4" Rp 131.136,56

REKAPITULASI ANALISA HARGA SATUAN


NON SNI
HARGA SATUAN
NO. JENIS PEKERJAAN
(Rp.)

HARGA SATUAN PEKERJAAN ELEKTRIKAL


Instalasi 1 buah titik lampu Rp 298.919,50