JUMLAH ( Rp )
NO URAIAN PEKERJAAN
( Rp )
Satu Milyar Tiga Ratus Empat Puluh Empat Juta Delapan Ratus Empat Puluh Tujuh Ribu
Terbilang :
Rupiah
IV PEKERJAAN PASANGAN
A MASJID
a Pekerjaan Acian Kolom
1 Pek. Acian Kolom Type K1 110.880 M2 A.4.4.2.27 46,205.50 5,123,265.84
2 Pek. Acian Kolom Type K2 102.960 M2 A.4.4.2.27 46,205.50 4,757,318.28
b Pekerjaan Acian Balok Bagian Luar
1 Pek. Acian Balok Type B1 Bagian Depan, Belakang Dan Samping) 108.850 M2 A.4.4.2.27 46,205.50 5,029,468.68
2 Pek. Acian Balok Type B2 Bagian Belakang 36.700 M2 A.4.4.2.27 46,205.50 1,695,741.85
c Pekerjaan Plesteran Dan Acian
1 Pek. Kanstien Batu Bata 1 : 4 5.100 M2 A.4.4.1.9 124,338.50 634,126.35
2 Pek. Plesteran 1 : 4 5.100 M2 A.4.4.2.4 75,280.26 383,929.33
3 Pek. Acian 5.100 M2 A.4.4.2.27 46,205.50 235,648.05
d Pekerjaan Lantai Masjid
1 Pek. Lantai Lapis Geranit Tile Glossy 60 x 60 cm 191.360 M2 A.4.4.3.9.a 292,089.72 55,894,289.24
e Pekerjaan Perkerasan Halaman
1 Pek. Lantai Paving Block Tebal 6 cm 115.000 M2 A.4.4.3.64 225,567.65 25,940,279.75
f Pekerjaan Lantai Km/Wc
1 Pek. Lantai Lapis Geranit Tile Anpolis 60 x 60 cm, Tinggi 180 cm 10.000 M2 A.4.4.3.9.b 322,645.28 3,226,452.78
2 Pek. Dinding Lapis Geranit Tile Glossy 60 x 60 cm, Tinggi 180 cm 40.000 M2 A.4.4.3.54.a 328,629.03 13,145,161.33
g Pekerjaan Lantai Tangga Hall
1 Pek. Lantai Lapis Geranit Tile Anpolis 60 x 60 cm 8.750 M2 A.4.4.3.9.b 322,645.28 2,823,146.18
Sub Jumlah A 118,888,827.66
1
Harga Satuan Jumlah
No. Uraian Pekerjaan Volume Sat Analisa
( Rp ) ( Rp )
B PEKERJAAN PASANGAN BATU
a Pekerjaan Pondasi Batu Kali Type 1
1 Pek. Plesteran 1 : 4 26.879 M2 A.4.4.2.27 75,280.26 2,023,420.47
2 Pek. Acian 26.879 M2 A.4.4.2.27 46,205.50 1,241,934.53
Sub Jumlah G 3,265,355.00
Total Sub Jumlah IV (A+B+C+D+E+F+G) 122,154,182.66
V PEKERJAAN ALUMINIUM, KACA, STAINLESS STEEL DAN LETTER
A PEKERJAAN MASJID
a Pekerjaan Kusen Masjid
1 Pek. Kusen Ventilasi Profil Alumunium 4", Type V1 79.550 M1 A.4.2.1.11 146,105.85 11,622,720.37
Sub Jumlah B 11,622,720.37
B PEKERJAAN TPQ
a Pekerjaan Kusen TPQ
1 Pek. Kusen Ventilasi Profil Alumunium 4", Type V2 28.690 M1 A.4.2.1.11 146,105.85 4,191,776.84
Sub Jumlah C 4,191,776.84
Total Sub Jumlah V (A+B+C+D+E) 15,814,497.20
VI PEKERJAAN KUBAH
a Kubah Dia 6 m
1 Pek. Kubah 1.000 Unit Ls 200,000,000.00 200,000,000.00
b Kubah Dia 2 m
1 Pek. Kubah 5.000 Unit Ls 15,000,000.00 75,000,000.00
Sub Jumlah A 275,000,000.00
Total Sub Jumlah VI (A+B+C) 275,000,000.00
VII PEKERJAAN SANITASI
A Tempa Wudhu
1 Pek. Kran Air Plastik KM/WC 18.000 Bh A.5.1.1.19.a 94,118.75 1,694,137.50
2 Pek. Instalasi Air Bersih Pipa PVC ø 1/2" Bagian Kanan 20.000 M1 A.5.1.1.25 22,770.00 455,400.00
3 Pek. Instalasi Air Bersih Pipa PVC ø 1/2" Bagian Kiri 20.000 M1 A.5.1.1.25 22,770.00 455,400.00
Sub Jumlah A 2,604,937.50
B WC/Toilet
1 Pek. Kloset Jongkok Porselin 2.000 Bh A.5.1.1.2 787,974.00 1,575,948.00
2 Pek. Wastafel Porselin 2.000 Unit A.5.1.1.5 1,332,496.00 2,664,992.00
3 Pek. Ember + Gayung Plastik 2.000 Unit Ls 150,000.00 300,000.00
4 Pek. Kran Air Plastik KM/WC 2.000 Bh A.5.1.1.19.a 94,118.75 188,237.50
5 Pek. Stop Kran KM/WC 2.000 Bh A.5.1.1.19.c 105,118.75 210,237.50
6 Pek. Stop Kran Washtafel 2.000 Bh A.5.1.1.19.c 105,118.75 210,237.50
7 Pek. Floor Drain 2.000 Bh A.5.1.1.14 45,842.50 91,685.00
8 Pek. Cermin Ukuran 60 x 75 cm 2.000 Bh A.5.1.1.19.e 231,522.50 463,045.00
Sub Jumlah B 5,704,382.50
C PEKERJAAN ATAP
1 Pek. Talang Pipa PVC AW 4" 60.000 M2 A.5.1.1.32 134,238.50 8,054,310.00
2 Tedmon 1.000 Bh Ls 1,850,000.00 1,850,000.00
Sub Jumlah D 9,904,310.00
Total Sub Jumlah IX (A+B+C+D) 18,213,630.00
IX PEKERJAAN INSTALASI LISTRIK
A MASJID
1 Pek. MDP Box Panel 3P 60 x 80 cm + MCB Group 1.000 unit Ls 5,000,000.00 5,000,000.00
2 Pek. Instalasi Box Panel Kabel NYY 4 x 10 mm 1.000 ttk Ls 1,000,000.00 1,000,000.00
3 Pek. Instalasi Titik Api Lampu Kabel NYM 2 x 2.5 mm + Pipa 18.000 ttk Ls 225,000.00 4,050,000.00
4 Pek. Instalasi Titik Api Stop Kontak Kabel NYM 3 x 2.5 mm + Pipa 6.000 ttk Ls 250,000.00 1,500,000.00
5 Pek. Fitting Downlight 5" 18.000 Bh Ls 85,000.00 1,530,000.00
6 Pek. Fitting Baret Ø 30 cm 2.000 Bh Ls 250,000.00 500,000.00
7 Pek. Fitting Taman + Tiang 4.000 Bh Ls 500,000.00 2,000,000.00
8 Pek. Bola Lampu LED 13 Watt 18.000 Bh Ls 65,000.00 1,170,000.00
9 Pek. Saklar Tunggal 3.000 Bh Ls 22,500.00 67,500.00
10 Pek. Saklar Ganda 18.000 Bh Ls 30,000.00 540,000.00
11 Pek. Stop Kontak 6.000 Bh Ls 25,000.00 150,000.00
b Pekerjaan Instalasi Listrik Air Conditioner (AC)
1 Pek. Box Panel 3P 40 x 60 cm + MCB Group 1.000 Bh Ls 4,000,000.00 4,000,000.00
2 Pek. Instalasi Titik Api AC Kabel NYY 4 x 2.5 mm + Pipa 4.000 ttk Ls 3,500,000.00 14,000,000.00
3 Pek. Stop AC 4.000 Bh Ls 200,000.00 800,000.00
Sub Jumlah B 36,307,500.00
Total Sub Jumlah X (A+B+C+D+E+F) 36,307,500.00
2
Harga Satuan Jumlah
No. Uraian Pekerjaan Volume Sat Analisa
( Rp ) ( Rp )
X PEKERJAAN PENGECATAN
A PEKERJAAN MASJID
a Pekerjaan Pengecatan Kolom Dengan Cat Tembok Exterior
1 Pek. Pengecatan Kolom Type K1 43.520 M2 A.4.7.1.10.b 55,674.30 2,422,945.54
2 Pek. Pengecatan Kolom Type K2 163.200 M2 A.4.7.1.10.b 55,674.30 9,086,045.76
b Pekerjaan Pengecatan Balok Dengan Cat Tembok Exterior
1 Pek. Pengecatan Balok Type B1 Bagian Depan, Belakang Dan Samping) 45.120 M2 A.4.7.1.10.b 55,674.30 2,512,024.42
2 Pek. Pengecatan Balok Type B2 Bagian Belakang 19.440 M2 A.4.7.1.10.b 55,674.30 1,082,308.39
b Pekerjaan Pengecatan Dinding Dengan Cat Tembok Interior
1 Pek. Pengecatan Dinding 720.770 M2 A.4.7.1.10.a 39,944.30 28,790,653.11
c Pekerjaan Pengecatan Plafond Dengan Cat Tembok Interior
1 Pek. Pengecatan Plafond Masjid 615.150 M2 A.4.7.1.10.d 42,694.30 26,263,398.65
2 Pek. Pengecatan Plafond Ruangan Toilet Dan KM/WC 33.140 M2 A.4.7.1.10.d 42,694.30 1,414,889.10
3 Pek. Pengecatan Plafond Teras 33.350 M2 A.4.7.1.10.d 42,694.30 1,423,854.91
Sub Jumlah C 29,102,142.65
Total Sub Jumlah XI (A+B+C) 29,102,142.65
XI PEKERJAAN LAIN - LAIN
1 Pek. Pembersihan Akhir 1.000 Unit Ls 1,500,000.00 2,000,000.00
Total Sub Jumlah XI 2,000,000.00
3
DAFTAR HARGA BAHAN DAN UPAH PEKERJA
UPAH PEKERJA
A TENAGA KERJA
1 Pekerja 105,000.00 /hari
2 Tukang 130,000.00 /hari
3 KepalaTukang 160,000.00 /hari
4 Mandor 205,000.00 /hari
HARGABAHAN / METERIAL
B BAHAN BATU DAN PASIR
1 Tanah urug 75,000.00 /m3
2 Pasir urug 125,000.00 /m3
3 Pasir pasang 150,000.00 /m3
4 Pasir beton 150,000.00 /m3
5 Batu bata 600.00 /buah
6 Batu kali 186,000.00 /m3
7 Sirtu 168,000.00 /m3
8 Koral 315,000.00 /m3
9 Split 1/2 - 2/3 325,000.00 /m3
10 Semen Portland ( PC ) 1,340.00 /kg
11 Semen putih 2,320.00 /kg
12 Semen warna 20,000.00 /kg
13 Paving block Tebal 6 cm 95,000.00 /m2
14 Air Bersih 150.00 /Liter
Jumlah 3,791,761.39
Jumlah 5,357,024.38
Jumlah 8,336,129.69
Jumlah 6,725,565.81