REKAPITULASI

INSTANSI : …......................................
PAKET : ….................................................................
SUMBER DANA : …...........................................
LOKASI : ….........................................
KABUPATEN : ….........................................
PROVINSI : …...........................................

NO JENIS PEKERJAAN JUMLAH HARGA (Rp)

I PEKERJAAN PERSIAPAN Rp 3,950,000.00

II PEKERJAAN GEDUNG PERTUNJUKAN Rp 357,787,210.85

III PEKERJAAN LAPANGAN PARKIR DAN TAMAN Rp 81,546,124.50

IV PEKERJAAN LAIN-LAIN Rp 2,180,000.00

TOTAL Rp 445,463,335.35

PPN 10% Rp 44,546,333.54

TOTAL BIAYA PEKERJAAN Rp 490,009,668.89

DIBULATKAN Rp 490,000,000.00

Terbilang :

`
RENCANA ANGGARAN BIAYA

INSTANSI : …......................................
PAKET : ….................................................................
SUMBER DANA : …...........................................
LOKASI : ….........................................
KABUPATEN : ….........................................
PROVINSI : …...........................................

NO URAIAN PEKERJAAN ANALISA VOLUME HARGA SATUAN JUMLAH


(Rp) (Rp)

I. PEKERJAAN PERSIAPAN

1 Papan Nama Proyek Ls 1.000 Ls 450,000.00 450,000.00


2 Sewa Gudang Bahan dan Peralatan Ls 1.000 Unit 2,500,000.00 2,500,000.00
3 Mobilisasi Demobilisasi Ls 1.000 Ls 1,000,000.00 1,000,000.00

SUB. TOTAL PEKERJAAN PERSIAPAN 3,950,000.00

II. PEKERJAAN GEDUNG PERTUNJUKAN

1 Pekerjaan Pemasangan Bowplank A. 2.2.1.4 66.800 M' 81,757.00 5,461,367.60


2 Pembersihan Lapangan Dan Perataan A. 2.2.1.9 219.128 M2 17,798.00 3,900,037.60
3 Pekerjaan Galian Tanah A. 2.3.1.1 34.900 M3 80,089.00 2,795,106.10
4 Pekerjaan Urugan Tanah Kembali A. 2.3.1.9 11.630 M3 58,478.00 680,099.14
5 Pekerjaan Pasir Urug A. 2.3.1.11 4.570 M3 404,621.00 1,849,117.97
6 Pekerjaan Timbunan Bukho Padat A. 2.3.1.14 119.010 M3 277,963.00 33,080,376.63
7 Pekerjaan Batu Kosong (aanstamping) A. 3.2.1.9 4.720 M3 639,830.00 3,019,997.60
8 Pekerjaan Pasangan Batu 1 : 4 A. 2.4.1.2 27.920 M3 1,267,115.00 35,377,850.80
9 Pekerjaan Sloof
a. Pekerjaan Bekisting A. 4.1.1.21 10.000 M2 272,181.00 2,721,810.00
b. Pekerjaan Pembesian A. 4.1.1.17 386.890 KG 17,177.00 6,645,609.53
c. Pekerjaan Beton Cor K-225 A.4.1.1.7 4.720 M3 1,806,996.00 8,529,021.12
10 Pekerjaan Kolom
a. Pekerjaan Bekisting A. 4.1.1.22 27.000 M2 380,763.00 10,280,601.00
b. Pekerjaan Pembesian A. 4.1.1.17 358.410 KG 17,177.00 6,156,408.57
c. Pekerjaan Beton Cor K-225 A.4.1.1.7 4.160 M3 1,806,996.00 7,517,103.36
11 Pekerjaan Ring Balok
a. Pekerjaan Bekisting A. 4.1.1.23 27.000 M2 391,746.00 10,577,142.00
b. Pekerjaan Pembesian A. 4.1.1.17 489.050 KG 17,177.00 8,400,411.85
c. Pekerjaan Beton Cor K-225 A.4.1.1.7 4.050 M3 1,806,996.00 7,318,333.80
12 Pekerjaan Lantai Beton Cor K-100 A.A.4.1.1.4 3.000 M3 1,469,839.00 4,409,517.00
13 Pekerjaan Dinding Pasangan 1 Bata A. 4.4.1.2 38.500 M2 548,841.00 21,130,378.50
14 Pekerjaan Acian Kolom A. 4.4.2.27 33.490 M2 45,042.00 1,508,456.58
15 Pekerjaan Keramik Lantai
a. Pekerjaan Keramik Uk. 40.40 A. 4.4.3.36a 188.760 M2 225,243.00 42,516,868.68
b. Pekerjaan Bon-bon Anal. Hitung 43.460 M' 75,103.00 3,263,976.38
16 Pekerjaan Atap
a. Pekerjaan Rangka Atap Baja Ringan Anal.Hitung 401.45 M2 161,227.00 64,724,579.15
b. Pekerjaan Penutup Atap Spandek A. 4.5.2.32 401.45 M2 102,876.00 41,299,570.20
c. Pekerjaan Rabung Atap A. 2.8.1.1 161.800 M' 122,214.00 19,774,225.20
17 Pekerjaan Listplank A. 2.9.1.3 51.630 M' 93,923.00 4,849,244.49

SUB. TOTAL PEKERJAAN GEDUNG PERTUNJUKAN 357,787,210.85

III. PEKERJAAN LAPANGAN PARKIR DAN TAMAN

1 Pekerjaan Pemasangan Bowplank A. 2.2.1.4 176.260 M' 81,757.00 14,410,488.82


2 Pembersihan Lapangan Dan Perataan A. 2.2.1.9 950.000 M2 17,798.00 16,908,100.00
3 Pekerjaan Galian Tanah A. 2.3.1.1 14.190 M3 80,089.00 1,136,462.91
4 Pekerjaan Urugan Tanah Kembali A. 2.3.1.9 4.730 M3 58,478.00 276,600.94
5 Pekerjaan Pasir Urug A. 2.3.1.11 1.770 M3 404,621.00 716,179.17
6 Pekerjaan Timbunan Bukho Padat A. 2.3.1.14 23.320 M3 277,963.00 6,482,097.16
7 Pekerjaan Pasangan 1/2 Bata 1 : 3 A. 4.4.1.8 118.250 M3 266,998.00 31,572,513.50
8 Pekerjaan Plesteran A. 4.4.2.3 118.250 M2 84,936.00 10,043,682.00

SUB. TOTAL PEKERJAAN LAPANGAN PARKIR DAN TAMAN 81,546,124.50

IV. PEKERJAAN LAIN-LAIN

1 Pekerjaan Pembersihan akhir Ls 1.000 Ls 1,000,000.00 1,000,000.00


2 Pelaporan dan Dokumentasi Ls 1.000 Ls 1,180,000.00 1,180,000.00

SUB. TOTAL PEKERJAAN LAIN-LAIN 2,180,000.00

TOTAL BIAYA PEKERJAAN 445,463,335.35

PPN (10%) 44,546,333.54

TOTAL BIAYA PEKERJAAN 490,009,668.89

DIBULATKAN 490,000,000.00

Terbilang :
DAFTAR ANALISA
A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN

A. 2.2.1.4
Pengukuran dan Pemasangan Bowplank 1 M'
A. Bahan/Material
0.012 M3 Kayu Balok 5/7 Rp. 2,147,194.00 Rp. 25,766.33
0.020 Kg Paku biasa Rp. 19,118.00 Rp. 382.36
0.007 M3 Kayu papan Rp. 3,239,694.00 Rp. 22,677.86
B. Tenaga
0.100 OH Pekerja Rp. 90,000.00 Rp. 9,000.00
0.100 OH Tukang Kayu Rp. 125,000.00 Rp. 12,500.00
0.010 OH Kepala Tukang Rp. 135,000.00 Rp. 1,350.00
0.005 OH Mandor Rp. 135,000.00 Rp. 675.00
Jumlah ( A + B ) Rp. 72,351.55
Over head & Profit 13% Rp. 9,405.70
Jumlah Harga Satuan Rp. 81,757.25
Dibulatkan Rp. 81,757.00

A. 2.2.1.9
Pembersihan 1 M2 lapangan dan Perataan
A. Tenaga
0.100 OH Pekerja Rp. 90,000.00 Rp. 9,000.00
0.050 OH Mandor Rp. 135,000.00 Rp. 6,750.00
Jumlah Rp. 15,750.00
Over head & Profit 13% Rp. 2,047.50
Jumlah Harga Satuan Rp. 17,797.50
Dibulatkan Rp. 17,798.00

A. 2.3.1 HARGA SATUAN PEKERJAAN TANAH

A. 2.3.1.1
1 M³ Galian tanah biasa sedalam 1 M
A. Tenaga
0.750 OH Pekerja Rp. 90,000.00 Rp. 67,500.00
0.025 OH Mandor Rp. 135,000.00 Rp. 3,375.00
Jumlah Rp. 70,875.00
Over head & Profit 13% Rp. 9,213.75
Jumlah Harga Satuan Rp. 80,088.75
Dibulatkan Rp. 80,089.00

A. 2.3.1.9
1 M³ Urugan tanah kembali
A. Tenaga
0.500 OH Pekerja Rp. 90,000.00 Rp. 45,000.00
0.050 OH Mandor Rp. 135,000.00 Rp. 6,750.00
Jumlah Rp. 51,750.00
Over head & Profit 13% Rp. 6,727.50
Jumlah Harga Satuan Rp. 58,477.50
Dibulatkan Rp. 58,478.00

A. 2.3.1.14
Pemadatan 1 M3 Tanah Timbunan Bukho
A. Bahan/Material
1.200 M3 Tanah Timbun Bukho Rp. 183,425.00 Rp. 220,110.00
B. Tenaga
0.250 OH Pekerja Rp. 90,000.00 Rp. 22,500.00
0.025 OH Mandor Rp. 135,000.00 Rp. 3,375.00
Jumlah Rp. 245,985.00
Over head & Profit 13% Rp. 31,978.05
Jumlah Harga Satuan Rp. 277,963.05
Dibulatkan Rp. 277,963.00

A. 2.3.1.11
Pengurugan 1 M3 Pasir Urug
A. Bahan/Material
1.200 M3 Pasir Urug Rp. 258,363.00 Rp. 310,035.60
B. Tenaga
0.300 OH Pekerja Rp. 90,000.00 Rp. 27,000.00
0.010 OH Mandor Rp. 135,000.00 Rp. 1,350.00
Jumlah Rp. 338,385.60
Over head & Profit 13% Rp. 43,990.13
MBLB 20% Rp. 22,245.60
Jumlah Harga Satuan Rp. 404,621.33
Dibulatkan Rp. 404,621.00

A. 3.3.21 HARGA SATUAN PEKERJAAN PONDASI

A. 3.2.1.9
1 M³ Pasangan batu kosong (Anstamping)
A. Bahan/Material
1.200 M³ Batu Gunung Belah jenis keras 10-15 cm Rp. 270,940.00 Rp. 325,128.00
0.432 M³ Pasir Urug Rp. 258,363.00 Rp. 111,612.82
B. Tenaga
0.780 OH Pekerja Rp. 90,000.00 Rp. 70,200.00
0.039 OH Mandor Rp. 135,000.00 Rp. 5,265.00
0.390 OH Tukang Rp. 125,000.00 Rp. 48,750.00
0.039 OH Kepala Tukang Rp. 135,000.00 Rp. 5,265.00
Jumlah Rp. 566,220.82
Over head & Profit 13% Rp. 73,608.71
MBLB 20% Rp. 8,008.42
Jumlah Harga Satuan Rp. 639,829.52
Dibulatkan Rp. 639,830.00

A. 2.4.1.2
1 M³ Pasangan batu belah 1 PC : 4 PP
A. Bahan/Material
1.200 M³ Batu Gunung Belah jenis keras 10-15 cm Rp. 270,940.00 Rp. 325,128.00
0.520 M³ Pasir pasang Rp. 373,248.00 Rp. 194,088.96
163.000 Kg Semen portland Rp. 2,049.20 Rp. 334,019.60
B. Tenaga
1.500 OH Pekerja Rp. 90,000.00 Rp. 135,000.00
0.075 OH Mandor Rp. 135,000.00 Rp. 10,125.00
0.750 OH Tukang Rp. 125,000.00 Rp. 93,750.00
0.075 OH Kepala Tukang Rp. 135,000.00 Rp. 10,125.00
Jumlah Rp. 1,102,236.56
Over head & Profit 13% Rp. 143,290.75
MBLB 20% Rp. 21,587.80
Jumlah Harga Satuan Rp. 1,267,115.11
Dibulatkan Rp. 1,267,115.00

A.4.1.1 HARGA SATUAN PEKERJAAN BETON

A.A.4.1.1.4
Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100)
A. Bahan/Material
230.000 Kg Semen portland Rp. 2,049.20 Rp. 471,316.00
0.638 M3 Pasir Beton Rp. 380,723.00 Rp. 242,846.89
0.761 M3 Batu Pecah 2-3 cm Rp. 418,673.00 Rp. 318,501.61
200.000 Ltr Air Rp. 500.00 Rp. 100,000.00
B. Tenaga
1.200 OH Pekerja Rp. 90,000.00 Rp. 108,000.00
0.200 OH Tukang Batu Rp. 125,000.00 Rp. 25,000.00
0.020 OH Kepala Tukang Rp. 135,000.00 Rp. 2,700.00
0.060 OH Mandor Rp. 135,000.00 Rp. 8,100.00
Jumlah Rp. 1,276,464.49
Over head & Profit 13% Rp. 165,940.38
MBLB 20% Rp. 27,434.24
Jumlah Harga Satuan Rp. 1,469,839.11
Dibulatkan Rp. 1,469,839.00

A.4.1.1.7
Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225)
A. Bahan/Material
371.000 Kg Semen portland Rp. 2,049.20 Rp. 760,253.20
0.499 M3 Pasir Beton Rp. 380,723.00 Rp. 189,817.61
0.776 M3 Batu Pecah 2-3 cm Rp. 418,673.00 Rp. 324,704.17
215.000 Ltr Air Rp. 500.00 Rp. 107,500.00
B. Tenaga
1.650 OH Pekerja Rp. 90,000.00 Rp. 148,500.00
0.275 OH Tukang Batu Rp. 125,000.00 Rp. 34,375.00
0.028 OH Kepala Tukang Rp. 135,000.00 Rp. 3,780.00
0.083 OH Mandor Rp. 135,000.00 Rp. 11,205.00
Jumlah Rp. 1,580,134.98
Over head & Profit 13% Rp. 205,417.55
MBLB 20% 21,443.56
Jumlah Harga Satuan Rp. 1,806,996.09
Dibulatkan Rp. 1,806,996.00

A. 4.1.1.17
1 Kg Besi Polos
A. Bahan/Material
1.0500 Kg Besi beton Polos Rp. 12,541.00 Rp. 13,168.050
0.0150 Kg Kawat beton Rp. 25,267.00 Rp. 379.005
B. Tenaga
0.0070 OH Pekerja Rp. 90,000.00 Rp. 630.000
0.0004 OH Mandor Rp. 135,000.00 Rp. 54.000
0.0070 OH Tukang Rp. 125,000.00 Rp. 875.000
0.0007 OH Kepala Tukang Rp. 135,000.00 Rp. 94.500
Jumlah Rp. 15,200.56
Over head & Profit 13% Rp. 1,976.07
Jumlah Harga Satuan Rp. 17,176.63
Dibulatkan Rp. 17,177.00

A. 4.1.1.21
pemasangan 1 M2 Bekisting Untuk Sloof
A. Bahan/Material
0.045 M3 Kayu Rp. 3,239,694.00 Rp. 145,786.23
0.300 Kg Paku biasa Rp. 19,118.00 Rp. 5,735.40
0.100 Ltr Minyak Bekisting Rp. 30,267.00 Rp. 3,026.70
B. Tenaga
0.520 OH Pekerja Rp. 90,000.00 Rp. 46,800.00
0.260 OH Tukang Rp. 125,000.00 Rp. 32,500.00
0.026 OH Kepala Tukang Rp. 135,000.00 Rp. 3,510.00
0.026 OH Mandor Rp. 135,000.00 Rp. 3,510.00
Jumlah Rp. 240,868.33
Over head & Profit 13% Rp. 31,312.88
Jumlah Harga Satuan Rp. 272,181.21
Dibulatkan Rp. 272,181.00

A. 4.1.1.22
pemasangan 1 M2 Bekisting Untuk Kolom
A. Bahan/Material
0.040 M3 Kayu Sembarang Rp. 2,147,194.00 Rp. 85,887.76
0.400 Kg Paku biasa Rp. 19,118.00 Rp. 7,647.20
0.200 Ltr Minyak Bekisting Rp. 30,267.00 Rp. 6,053.40
2.000 Btg Kayu Dolken Rp. 22,537.00 Rp. 45,074.00
0.350 Lbr tripleks Tebal 4 mm Rp. 97,545.00 Rp. 34,140.75
0.015 M3 Balok Kayu Rp. 3,239,694.00 Rp. 48,595.41
B. Tenaga
0.660 OH Pekerja Rp. 90,000.00 Rp. 59,400.00
0.330 OH Tukang Rp. 125,000.00 Rp. 41,250.00
0.033 OH Kepala Tukang Rp. 135,000.00 Rp. 4,455.00
0.033 OH Mandor Rp. 135,000.00 Rp. 4,455.00
Jumlah Rp. 336,958.52
Over head & Profit 13% Rp. 43,804.61
Jumlah Harga Satuan Rp. 380,763.13
Dibulatkan Rp. 380,763.00

A. 4.1.1.23
pemasangan 1 M2 Bekisting Untuk Balok
A. Bahan/Material
0.040 M3 Kayu Sembarang Rp. 2,147,194.00 Rp. 85,887.76
0.400 Kg Paku biasa Rp. 19,118.00 Rp. 7,647.20
0.200 Ltr Minyak Bekisting Rp. 30,267.00 Rp. 6,053.40
2.000 Btg Kayu Dolken Rp. 22,537.00 Rp. 45,074.00
0.350 Lbr Tripleks Tebal 4 mm Rp. 97,545.00 Rp. 34,140.75
0.018 M3 Balok Kayu Rp. 3,239,694.00 Rp. 58,314.49
B. Tenaga
0.660 OH Pekerja Rp. 90,000.00 Rp. 59,400.00
0.330 OH Tukang Rp. 125,000.00 Rp. 41,250.00
0.033 OH Kepala Tukang Rp. 135,000.00 Rp. 4,455.00
0.033 OH Mandor Rp. 135,000.00 Rp. 4,455.00
Jumlah Rp. 346,677.60
Over head & Profit 13% Rp. 45,068.09
Jumlah Harga Satuan Rp. 391,745.69
Dibulatkan Rp. 391,746.00

A. 4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING

A. 4.4.1.2
Pemasangan 1m2 dinding bata (5x11x22) cm tebal 1 bata campuran 1SP : 3PP
A. Bahan/Material
140.000 Bh Batu bata uk. 5x10x20 cm Rp. 2,108.00 Rp. 295,120.00
32.950 Kg Portland Cement Rp. 2,049.20 Rp. 67,521.14
0.091 M3 Pasir Pasang Rp. 373,248.00 Rp. 33,965.57
B. Tenaga
0.600 Oh Pekerja Rp. 90,000.00 Rp. 54,000.00
0.200 Oh Tukang Rp. 125,000.00 Rp. 25,000.00
0.020 Oh Kepala Tukang Rp. 135,000.00 Rp. 2,700.00
0.030 Oh Mandor Rp. 135,000.00 Rp. 4,050.00
Jumlah Rp. 482,356.71
Over head & Profit 13% Rp. 62,706.37
MBLB 20% Rp. 3,777.87
Jumlah Harga Satuan Rp. 548,840.95
Dibulatkan Rp. 548,841.00

A. 4.4.1.8
Pemasangan 1m2 dinding bata (5x11x22) cm tebal 1/2 bata campuran 1SP : 3PP
A. Bahan/Material
70.000 Bh Batu bata uk. 5x10x20 cm Rp. 2,108.00 Rp. 147,560.00
14.370 Kg Portland Cement Rp. 2,049.20 Rp. 29,447.00
0.040 M3 Pasir Pasang Rp. 373,248.00 Rp. 14,929.92
B. Tenaga
0.300 Oh Pekerja Rp. 90,000.00 Rp. 27,000.00
0.100 Oh Tukang Rp. 125,000.00 Rp. 12,500.00
0.010 Oh Kepala Tukang Rp. 135,000.00 Rp. 1,350.00
0.015 Oh Mandor Rp. 135,000.00 Rp. 2,025.00
Jumlah Rp. 234,811.92
Over head & Profit 13% Rp. 30,525.55
MBLB 20% Rp. 1,660.60
Jumlah Harga Satuan Rp. 266,998.07
Dibulatkan Rp. 266,998.00

A. 4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN

A. 4.4.2.3
Pemasangan 1m2 plesteran 1SP : 3PP tebal 15 mm
A. Bahan/Material
7.776 Kg Portland Cement (PC) Rp. 2,049.20 Rp. 15,934.58
0.023 M3 Pasir Pasang (PP) Rp. 373,248.00 Rp. 8,584.70
B. Tenaga
0.300 Oh Pekerja Rp. 90,000.00 Rp. 27,000.00
0.150 Oh Tukang Rp. 125,000.00 Rp. 18,750.00
0.015 Oh Kepala Tukang Rp. 135,000.00 Rp. 2,025.00
0.015 Oh Mandor Rp. 135,000.00 Rp. 2,025.00
Jumlah Rp. 74,319.28
Over head & Profit 13% Rp. 9,661.51
MBLB 20% Rp. 954.85
Jumlah Harga Satuan Rp. 84,935.64
Dibulatkan Rp. 84,936.00

A. 4.4.2.27
Membuat 1 M2 Acian
A. Bahan/Material
3.250 Kg Portland Cement (PC) Rp. 2,049.20 Rp. 6,659.90
B. Tenaga
0.200 Oh Pekerja Rp. 90,000.00 Rp. 18,000.00
0.100 Oh Tukang Rp. 125,000.00 Rp. 12,500.00
0.010 Oh Kepala Tukang Rp. 135,000.00 Rp. 1,350.00
0.010 Oh Mandor Rp. 135,000.00 Rp. 1,350.00
Jumlah Rp. 39,859.90
Over head & Profit 13% Rp. 5,181.79
Jumlah Harga Satuan Rp. 45,041.69
Dibulatkan Rp. 45,042.00

A. 4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP

A. 2.8.1.1
Pemasangan 1 m' Rabung Spandek
A. Bahan/Material
1.100 lbr Rabung Spandek Rp. 56,517.00 Rp. 62,168.70
0.050 kg Paku biasa 0,5"-1" Rp. 19,118.00 Rp. 955.90

B. Tenaga
0.250 Oh Pekerja Rp. 90,000.00 Rp. 22,500.00
0.150 Oh Tukang Rp. 125,000.00 Rp. 18,750.00
0.015 Oh Kepala Tukang Rp. 135,000.00 Rp. 2,025.00
0.013 Oh Mandor Rp. 135,000.00 Rp. 1,755.00
Jumlah Rp. 108,154.60
Over head & Profit 13% Rp. 14,060.10
Jumlah Harga Satuan Rp. 122,214.70
Dibulatkan Rp. 122,214.00

A. 4.5.2.32
Pemasangan 1 M2 Atap Spandek
A. Bahan/Material
1.020 M' Atap Spandek Rp. 56,517.00 Rp. 57,647.34
0.200 kg Paku Skrup Rp. 967.00 Rp. 193.40

B. Tenaga
0.200 Oh Pekerja Rp. 90,000.00 Rp. 18,000.00
0.100 Oh Tukang Rp. 125,000.00 Rp. 12,500.00
0.010 Oh Kepala Tukang Rp. 135,000.00 Rp. 1,350.00
0.010 Oh Mandor Rp. 135,000.00 Rp. 1,350.00
Jumlah Rp. 91,040.74
Over head & Profit 13% Rp. 11,835.30
Jumlah Harga Satuan Rp. 102,876.04
Dibulatkan Rp. 102,876.00

Anal.Hitung
Pemasangan 1 m2 Rangka Atap Baja Ringan
A. Bahan/Material
2.800 m' Profil Aluminium C.75 mm Rp. 16,311.33 Rp. 45,671.73
5.100 m' Profil Aluminium V.0,45 mm Rp. 8,394.67 Rp. 42,812.80
35.000 Bh Baut Rp. 198.84 Rp. 6,959.52

B. Tenaga
0.300 Oh Pekerja Rp. 90,000.00 Rp. 27,000.00
0.150 Oh Tukang Rp. 125,000.00 Rp. 18,750.00
0.010 Oh Kepala Tukang Rp. 135,000.00 Rp. 1,350.00
0.001 Oh Mandor Rp. 135,000.00 Rp. 135.00
Jumlah Rp. 142,679.06
Over head & Profit 13% Rp. 18,548.28
Jumlah Harga Satuan Rp. 161,227.33
Dibulatkan Rp. 161,227.00

A. 4.5.1 HARGA SATUAN PEKERJAAN PLAFOND


A. 2.9.1.3
Pemasangan 1 m1 Listplank Uk. 3.20 cm Kayu Kelas II
A. Bahan/Material
0.01080 M3 Papan Kayu Rp. 4,059,069.00 Rp. 43,837.95
0.100 kg Paku Rp. 19,050.00 Rp. 1,905.00

B. Tenaga
0.100 Oh Pekerja Rp. 90,000.00 Rp. 9,000.00
0.200 Oh Tukang Rp. 125,000.00 Rp. 25,000.00
0.020 Oh Kepala Tukang Rp. 135,000.00 Rp. 2,700.00
0.005 Oh Mandor Rp. 135,000.00 Rp. 675.00
Jumlah Rp. 83,117.95
Over head & Profit 13% Rp. 10,805.33
Jumlah Harga Satuan Rp. 93,923.28
Dibulatkan Rp. 93,923.00

SNI. 3434-2008
Pemasangan 1 m2 Rangka Langit-langit (60 x 60 cm), Plafond
A. Bahan/Material
0.016 M3 Balok 5-7 cm Rp. 4,059,069.00 Rp. 66,162.82
3.600 Ls Asesories (Perkuatan las dll) Rp. 12,507.42 Rp. 45,026.70
0.250 Kg Paku Rp. 19,118.00 Rp. 4,779.50
B. Tenaga
0.200 Oh Pekerja Rp. 90,000.00 Rp. 18,000.00
0.300 Oh Tukang Rp. 125,000.00 Rp. 37,500.00
0.0300 Oh Kepala Tukang Rp. 135,000.00 Rp. 4,050.00
0.0100 Oh Mandor Rp. 135,000.00 Rp. 1,350.00
Jumlah Rp. 176,869.02
Over head & Profit 13% Rp. 22,992.97
Jumlah Harga Satuan Rp. 199,862.00
Dibulatkan Rp. 199,861.00

A. 3.1.1. HARGA SATUAN PEKERJAAN KERAMIK

A. 4.4.3.36a
Pemasangan 1 m2 Lantai Keramik 40 x40 cm
A. Bahan/Material
6.250 bh Ubin Keramik Rp. 15,243.17 Rp. 95,269.79
10.400 kg Semen Portland Rp. 2,049.20 Rp. 21,311.68
0.045 M3 Pasir Pasang Rp. 373,248.00 Rp. 16,796.16
1.620 kg Semen Warna Rp. 5,042.75 Rp. 8,169.26
B. Tenaga
0.150 Oh Pekerja Rp. 90,000.00 Rp. 13,500.00
0.300 Oh Tukang Rp. 125,000.00 Rp. 37,500.00
0.0300 Oh Kepala Tukang Rp. 135,000.00 Rp. 4,050.00
0.0080 Oh Mandor Rp. 135,000.00 Rp. 1,080.00
Jumlah Rp. 197,676.89
Over head & Profit 13% Rp. 25,698.00
MBLB 20% Rp. 1,868.18
Jumlah Harga Satuan Rp. 225,243.06
Dibulatkan Rp. 225,243.00

A. 4.4.3.36
Pemasangan 1 m2 Lantai Keramik 20 x20 cm
A. Bahan/Material
26.500 bh Ubin Keramik Rp. 3,508.36 Rp. 92,971.54
10.400 kg Semen Portland Rp. 2,049.20 Rp. 21,311.68
0.045 M3 Pasir Pasang Rp. 373,248.00 Rp. 16,796.16
1.620 kg Semen Warna Rp. 5,042.75 Rp. 8,169.26
B. Tenaga
0.150 Oh Pekerja Rp. 90,000.00 Rp. 13,500.00
0.300 Oh Tukang Rp. 125,000.00 Rp. 37,500.00
0.0300 Oh Kepala Tukang Rp. 135,000.00 Rp. 4,050.00
0.0080 Oh Mandor Rp. 135,000.00 Rp. 1,080.00
Jumlah Rp. 195,378.64
Over head & Profit 13% Rp. 25,399.22
MBLB 20% Rp. 1,868.18
Jumlah Harga Satuan Rp. 222,646.03
Dibulatkan Rp. 222,646.00

Anal. Hitung
Pemasangan 1 m1 Bon-bon Keramik
A. Bahan/Material
10.000 bh Bon-bon Keramik Rp. 770.90 Rp. 7,709.00
0.050 kg Semen Portland Rp. 2,049.20 Rp. 102.46
0.500 kg Semen Warna Rp. 5,042.75 Rp. 2,521.38
B. Tenaga
0.150 Oh Pekerja Rp. 90,000.00 Rp. 13,500.00
0.300 Oh Tukang Rp. 125,000.00 Rp. 37,500.00
0.0300 Oh Kepala Tukang Rp. 135,000.00 Rp. 4,050.00
0.0080 Oh Mandor Rp. 135,000.00 Rp. 1,080.00
Jumlah Rp. 66,462.84
Over head & Profit 13% Rp. 8,640.17
Jumlah Harga Satuan Rp. 75,103.00
Dibulatkan Rp. 75,103.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN

N0 NAMA BAHAN HARGA SATUAN

A DAFTAR PEKERJA
1 Pekerja Rp 90,000 Hari
2 Mandor Rp 135,000 Hari
3 Tukang Rp 125,000 Hari
4 Kepala Tukang Rp 135,000 Hari
5 Operator Mekanik Rp 270,000 Hari
6 Pembantu Operator Rp 110,000 Hari
7 Supir Rp 110,000 Hari
8 Pembantu supir Rp 90,000 Hari
9 Jaga malam Rp 130,000 Hari
10 Pemahat/Pengukir Rp 130,000 Hari

B DAFTAR BAHAN
B.I BAHAN - BAHAN GALIAN
1 Batu Kali Belah jenis keras uk. 10/15 cm Rp 214,477.00 M3
2 Batu Gunung Belah jenis keras 10-15 cm Rp 270,940.00 M3
3 Kerikil Sungai disaring Uk. 0.5 - 2 cm Rp 483,577.00 M3
4 Kerikil Sungai tidak disaring Rp 417,337.00 M3
5 Pasir Pasangan Rp 463,567.00 M3
6 Pasir Beton Rp 472,537.00 M3
7 Batu Kali Pecah 2-3 cm Rp 518,077.00 M3
8 Pasir Urug Rp 325,705.00 M3
9 Sirtu Rp 417,337.00 M3
10 Batu bata uk. 5x10x20 cm Rp 2,494.00 Bh
11 Batako Rp 6,519.00 Bh
12 Tanah Timbunan Pilihan Rp 315,445.00 M3
13 Tanah Timbunan Setempat Rp 211,945.00 M3
14 Air kerja Rp 500.00 Ltr
15 Batu Alam Rp 413,271.00 M2

B.II BAHAN - BAHAN PERKAYUAN


1 Broti/papan kayu simalambuo Rp 4,059,069.00 M3
2 Broti/papan kayu Afoa, Godu (jenis keras) Rp 3,964,654.00 M3
2 Broti/papan kayu Berua, Manawadano Rp 3,859,544.00 M3
3 Broti/papan Kale-kale, Siholi, Ri'i, Kuruil, Baruzo, Bayo Rp 3,469,694.00 M3
4 Kayu Sembarang Rp 2,147,194.00 M3
5 Kayu bulat dia. 10-15; Pnj. 3,5 m Rp 101,344.00 Btg
6 Kayu bulat dia. 7-8; Pnj. 3,5 m (dolo2) Rp 97,319.00 Btg
7 Kayu Api Rp 249,694.00 M3
8 Tripleks 4 mm Rp 87,800.00 Lbr
B.III BAHAN - BAHAN BES, SEMEN, ALUMUNIUM DAN PIPA
1 Besi Beton polos Rp 12,574.00 Kg
2 Besi Beton ulir Rp 12,896.00 Kg
3 Paku kayu (segala ukuran) Rp 19,050.00 Kg
4 Baja Profil Rp 15,050.00 Kg
5 Seng Gelombang Rp 47,800.00 Lbr
6 Seng Pelat Rp 47,800.00 Lbr
7 Semen serbaguna 50 kg/zak Rp 1,995.42 Kg
8 Semen putih 40 kg/zak Rp 3,980.42 Kg
9 Kawat ikat /bendrat Rp 25,300.00 Kg
10 Pipa Pvc Type AW Diameter 1/2 " Rp 44,050.00 Btg
11 Pipa Pvc Type AW Diameter 1 "/panj. 6 m Rp 75,300.00 Btg
12 Pipa Pvc Type AW Diameter 2 "/panj. 6 m Rp 162,800.00 Btg
13 Minyak bekisting Rp 35,300.00 Ltr
14 Besi Hollow Merk Kobe 40 x 40 mm Rp 37,800.00 Btg
15 Lantai Keramik 20 x 20 cm Merk IKAD Rp 87,800.00 Liter
16 Lantai Keramik 40 x 40 cm Merk IKAD Rp 91,550.00 Btg
17 Kanal Trus C.75 merk A+ Rp 97,800.00 Kotak
18 Reng Trus Baja Ringan Kotak
19 Rabung Spandek 0.3 mm Rp 56,550.00 Btg
20 Baut Kecil Baja Ringan Rp 198.88 Btg
21 Baut Besar Baja Ringan Rp 334.00 Lbr
22 Atap Spandek 0.3 mm dan Pemasangan Rp 56,550.00 Bgks
23 Besi CNP 7 x 3.5 x 6 m Rp 222,300.00 Btg

C DAFTAR ALAT

1 Las Listrik Rp 36,000.00 jam


2 Buldozer Rp 398,014.22 jam
3 Dump Truk 3,5 Ton Rp 232,621.99 jam
4 Excavator Rp 367,802.80 jam
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Tanah Timbun Pilihan
Lokasi : Teluk Dalam
Tujuan : Teluk Dalam
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km
4 Harga satuan Tanah Timbun di Quarry RpM44 1.00 M3 177,100.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 367,802.80
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 232,621.99
7 Berat volume pasir urug Bil 1.42 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 8,823.89 Rupiah

DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 3.55 menit
- Waktu tempuh isi = (L/v1) x 60 T2 15.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 10.00 menit
- Lain-lain T4 1.00 menit
Ts2 29.55 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Tanah Timbun Pilihan
Lokasi : Teluk Dalam
Tujuan : Teluk Dalam

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 4.15 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 55,997.54 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 241,921.43 Rupiah

Dibulatkan : M44 241,900.00 Rupiah


ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Tanah Timbun Setempat
Lokasi : Teluk Dalam
Tujuan : Teluk Dalam
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

I. ASUMSI
1 Menggunakan alat berat
2 Kondisi Jalan : baik
3 Jarak Quarry ke lokasi pekerjaan L 5.00 Km
4 Harga satuan Tanah Timbun di Quarry RpM44 1.00 M3 90,850.00
5 Harga Satuan Dasar Excavator RpE10 1.00 Jam 367,802.80
6 Harga Satuan Dasar Dump Truck RpE08 1.00 Jam 232,621.99
7 Berat volume pasir urug Bil 1.42 ton/m3

II. URUTAN KERJA


1 pasir urug digali dengan Excavator
2 Excavator sekaligus memuat pasir urug
hasil galian ke dalam Dump Truck
3 Dump Truck mengangkut pasir urug
ke lokasi pekerjaan

III. PERHITUNGAN

EXCAVATOR (E10)
Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83 -
Waktu siklus Ts1
- Menggali / memuat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit
Kap. Prod. / jam =
V x Fb x Fa x 60 Q1 41.6826 M3 / Jam
Ts1

Biaya Excavator / M3 = (1 : Q1) x RpE10 Rp1 8,823.89 Rupiah

DUMP TRUCK (E08)


Kapasitas bak V 3.50 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 20.00 KM/Jam
Kecepatan rata-rata kosong v2 30.00 KM/Jam
Waktu siklus Ts2
- Muat = (V x 60)/(Q1 x Bil) T1 3.55 menit
- Waktu tempuh isi = (L/v1) x 60 T2 15.00 menit
- Waktu tempuh kosong = (L/v2) x 60 T3 10.00 menit
- Lain-lain T4 1.00 menit
Ts2 29.55 menit

Bersambung
ANALISA HARGA DASAR SATUAN BAHAN
Jenis : Tanah Timbun Setempat
Lokasi : Teluk Dalam
Tujuan : Teluk Dalam

Lanjutan
HARGA
No. URAIAN KODE KOEF. SATUAN SATUAN
(Rp.)

Kapasitas Produksi / Jam =


V x Fa x 60 Q2 4.15 M3 / Jam
Ts2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08 Rp2 55,997.54 Rupiah

IV. HARGA SATUAN DASAR BAHAN


DI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 ) M44 155,671.43 Rupiah

Dibulatkan : M44 155,700.00 Rupiah


DAFTAR HARGA SATUAN UPAH DAN BAHAN

N0 NAMA BAHAN HARGA SATUAN

A DAFTAR PEKERJA
1 Pekerja Rp 90,000 Orang/Hari
2 Tukang Rp 125,000 Orang/Hari
3 Kepala Tukang Rp 135,000 Orang/Hari
4 Mandor Rp 135,000 Orang/Hari
5 Operator Mekanik Rp 270,000 Orang/Hari
6 Pembantu Operator Rp 110,000 Orang/Hari
7 Supir Rp 110,000 Orang/Hari
8 Pembantu supir Rp 90,000 Orang/Hari
9 Jaga malam Rp 130,000 Orang/Hari
10 Pemahat/Pengukir Rp 130,000 Orang/Hari

B DAFTAR BAHAN

B.I BAHAN - BAHAN GALIAN


1 Tanah Timbunan Pilihan Rp 271,975.00 M3
2 Tanah Timbunan Setempat Rp 193,775.00 M3
3 Pasir Pasangan Rp 373,248.00 M3
4 Pasir Beton Rp 380,723.00 M3
5 Pasir Urug Rp 258,363.00 M3
6 Sirtu Rp 334,723.00 M3
7 Bukho Rp 183,425.00 M3
B.II BAHAN PEREKAT
1 Semen serbaguna 50 kg/zak Rp 2,049.20 Kg
2 Semen putih 40 kg/zak Rp 5,042.75 Kg
B.III BATU/BATU CETAKAN
1 Batu Kali Belah jenis keras uk. 10-15 cm Rp 326,673.00 M3
2 Batu Gunung Belah jenis keras 10-15 cm Rp 270,940.00 M3
3 Kerikil Sungai disaring Uk. 0.5 - 2 cm Rp 389,923.00 M3
4 Kerikil Sungai tidak disaring Rp 334,723.00 M3
5 Batu Pecah 2-3 cm Rp 418,673.00 M3
6 Batu Pecah 5-7 cm Rp 361,173.00 M3
7 Batako Rp 6,408.00 Bh
8 Batu bata uk. 5x10x20 cm Rp 2,108.00 Bh
9 Batu Alam (Andesit) Uk. 30x60 cm Rp 412,958.00 M2
B.IV KAYU/LANGIT-LANGIT
1 Broti/papan kayu simalambuo Rp 4,059,069.00 M3
2 Broti/papan kayu Afoa, Godu (jenis keras) Rp 3,918,654.00 M3
3 Broti/papan kayu Berua, Manawadano Rp 3,859,544.00 M3
4 Broti/papan Kale-kale, Siholi, Ri'i, Kuruil, Baruzo, Bayo Rp 3,239,694.00 M3
5 Kayu Sembarang Rp 2,147,194.00 M3
6 Kayu bulat dia. 10-15; Pnj. 3,5 m Rp 26,562.00 M3
7 Kayu bulat dia. 7-8; Pnj. 3,5 m (dolo2) Rp 22,537.00 Btg
8 Kayu Api Rp 232,444.00 M3
9 Tripleks 4 mm Rp 97,545.00 Lbr
10 Paku kayu (segala ukuran) Rp 19,118.00 Kg
11 Profil Aluminium C-75 Tebal 0,75 mm Rp 16,311.33 M1
12 Profil Aluminium V Tebal 0,45 mm Rp 8,394.67 M1
B.V BESI/ALUMINIUM
1 Besi Profil Rp 15,017.00 Kg
2 Besi Beton polos Rp 12,541.00 Kg
3 Besi Beton ulir Rp 12,863.00 Kg
4 Besi Hollow 40 x 40 mm Rp 34,419.50 Batang
5 Pipa GIP dia. 2" Tebal 2.0 mm Rp 75,044.50 M'
6 Pipa GIP dia. 3" Tebal 2.0 mm Rp 72,494.50 M'
7 Pipa GIP dia. 4" Tebal 2.0 mm Rp 105,700.83 M'
8 Kawat ikat /bendrat Rp 25,267.00 Kg
9 Besi CNP 7 x 3.5 x 6 m Rp 222,267.00 Batang
B.VI PENUTUP ATAP
1 Atap Bitumen Rp 80,267.00 M2
2 Atap Spandek Rp 56,517.00 M2
3 Rabung Spandek 0.3 mm Rp 56,517.00 M'
4 Baut Kecil Baja Ringan Rp 198.84 Bh
5 Baut Besar Baja Ringan Rp 333.93 Bh
6 GRC Board 9,0 mm Rp 312,767.00 Lembar
7 Paku Scrup Rp 967.00 Bh
8 Seng Gelombang Rp 950,267.00 Lbr
9 Seng Pelat Rp 41,517.00 Lbr
B.VII SANITAIR
1 Pipa Pvc Type AW Diameter 3/4 " Rp 9,002.83 M'
2 Pipa Pvc Type AW Diameter 6 " Rp 44.50 M'
3 Pipa Pvc Type AW Diameter 8" Rp 145,877.83 M'
B.VIII PENUTUP LANTAI
1 Lantai Keramik 20 x 20 cm Merk IKAD Rp 3,508.36 Kotak
2 Lantai Keramik 40 x 40 cm Merk IKAD Rp 15,243.17 Kotak
3 Bon-bon Keramik Rp 770.90 Bh
B.IX ACC dan LAIN-LAIN
1 Kunci Tanam Rp 437,767.00 Bh
2 Engsel Rp 59,642.00 Bh
3 Grendel Rp 56,517.00 Bh
4 Kran Rp 43,392.00 Bh
5 Sealtape Rp 5,767.00 Bh
6 Wastafel Rp 348,290.00 Bh
7 Kawat Las Rp 25,267.00 Kg
8 Solar Rp 7,267.00 Ltr
9 Minyak Pelumas Rp 30,267.00 Ltr
10 Kaca 5 mm Rp 121,542.00 M2
11 Water Tank Rp 2,500,267.00 Bh
12 Pompa Air Panasonic Rp 1,125,267.00 Bh
13 Lem Kayu Rp 10,267.00 Kg
14 Paving Block Rp 2,510.00 Bh
HARGA DAN JARAK RATA-RATA DARI SUMBER MATERIAL DAN BAHAN

INSTANSI : DINAS PARIWISATA DAN KEBUDAYAAN

PAKET : PEMBANGUNAN SARANA OBJEK WISATA DI PANTAI INDAH TURELOTO KEC. LAHEWA (LANJUTAN)

SUMBER DANA : APBD 2017

LOKASI : KECAMATAN LAHEWA

KABUPATEN : NIAS UTARA

PROVINSI : SUMATERA UTARA

Ongkos Truk (Rp)


Harga Angkut Sampai Dilokasi
Medan Jalan
Jarak
Harga Bahan Mineral dan Jarak
Berat Jenis Tempat Angkut Datar Bukit
No Uraian Satuan Tangkahan Bukan Logam 20 % Angkut Laut Dengan
Kg/M3 Tangkahan Pikul Jarak Angkut Jarak Angkut Dengan Angkut Dengan
Kondisi Kondisi Tenaga
Darat Truk Darat Truk Truck Angkut Laut
Pikul
Baik Sedang Jelek Baik Sedang Jelek
(Rp) (Rp) ( Mil ) ( Km ) (Km) (Rp) (Rp) (Rp) (Km) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 22 23 24

A BAHAN GALIAN/TANAH

1 Tanah Timbunan Pilihan M3 - 169,050.00 5.00 102,925.0 102,925.00 - -

2 Tanah Timbunan Setempat M3 - 90,850.00 5.00 102,925.0 102,925.00 - -

3 Pasir Pasangan M3 - 207,575.00 41,515.00 18.50 165,673.0 165,673.00 - -

4 Pasir Beton M3 - 215,050.00 43,010.00 18.50 165,673.0 165,673.00 - -

5 Pasir Urug M3 - 92,690.00 18,538.00 18.50 165,673.0 165,673.00 - -

6 Sirtu M3 - 169,050.00 33,810.00 18.50 165,673.0 165,673.00 - -

7 Bukho M3 - 80,500.00 5.00 102,925.0 102,925.00 - -

B BAHAN PEREKAT

1 Semen serbaguna 50 kg/zak Zak GUNUNGSITOLI 88,000.00 39.50 9,861.00 21.00 4,599.00 14,460.00 - -

2 Semen putih 40 kg/zak Zak GUNUNGSITOLI 187,250.00 39.50 9,861.00 21.00 4,599.00 14,460.00 - -

C BATU/BATU CETAKAN

1 Batu Kali Belah jenis keras uk. 10-15 cm M3 - 161,000.00 18.50 165,673.00 165,673.00 -

2 Batu Gunung Belah jenis keras 10-15 cm M3 - 168,015.00 5.00 102,925.00 102,925.00

3 Kerikil Sungai disaring Uk. 0.5 - 2 cm M3 - 224,250.00 18.50 165,673.00 165,673.00

4 Kerikil Sungai tidak disaring M3 - 169,050.00 18.50 165,673.00 165,673.00

5 Batu Pecah 2-3 cm M3 - 253,000.00 18.50 165,673.00 165,673.00

6 Batu Pecah 5-7 cm M3 - 195,500.00 18.50 165,673.00 165,673.00

7 Batako Bh - 5,894.00 18.50 514.32 514.32

8 Batu bata uk. 5x10x20 cm Bh - 1,869.00 18.50 239.00 21.00 184.17 239.00

9 Batu Alam (Andesit) Uk. 30x60 cm M2 GUNUNGSITOLI 412,500.00 39.50 273.85 21.00 184.17 458.02

D KAYU/LANGIT-LANGIT

1 Broti/papan kayu simalambuo M3 - 3,981,875.0 5.00 77,194.00 77,194.00

2 Broti/papan kayu Afoa, Godu (jenis keras) M3 - 3,841,460.00 5.00 77,194.00 77,194.00

3 Broti/papan kayu Berua, Manawadano M3 - 3,782,350.0 5.00 77,194.00 77,194.00

4 Broti/papan Kale-kale, Siholi, Ri'i, Kuruil, Baruzo, B M3 - 3,162,500.00 5.00 77,194.00 77,194.00

5 Kayu Sembarang M3 - 2,070,000.00 5.00 77,194.00 77,194.00

6 Kayu bulat dia. 10-15; Pnj. 3,5 m Btg - 24,150.00 5.00 2,412.31 2,412.31

7 Kayu bulat dia. 7-8; Pnj. 3,5 m (dolo2) Btg - 20,125.00 5.00 2,412.31 2,412.31

8 Kayu Api M3 - 155,250.00 5.00 77,194.00 77,194.00

9 Tripleks 4 mm Lbr GUNUNGSITOLI 87,500.00 39.50 9,861.00 21.00 184.17 10,045.17

10 Paku kayu (segala ukuran) Kg GUNUNGSITOLI 18,750.00 39.50 184.08 21.00 184.17 368.25

11 Profil Aluminium C-75 Tebal 0,75 mm Batang GUNUNGSITOLI 97,500.00 39.50 184.08 21.00 184.17 368.25

12 Profil Aluminium V Tebal 0,45 mm Batang GUNUNGSITOLI 50,000.00 39.50 184.08 21.00 184.17 368.25

E BESI/ALUMINIUM
1 Besi Profil Kg GUNUNGSITOLI 14,750.00 39.50 184.08 21.00 83.58 267.66

2 Besi Beton polos Kg GUNUNGSITOLI 12,274.00 39.50 184.08 - 21.00 83.58 267.66

3 Besi Beton ulir Kg GUNUNGSITOLI 12,596.00 39.50 184.08 - 21.00 83.58 267.66

4 Besi Hollow 40 x 40 mm Batang GUNUNGSITOLI 206,250.00 39.50 184.08 - 21.00 83.58 267.66

5 Pipa GIP dia. 2" Tebal 2.0 mm Batang GUNUNGSITOLI 450,000.00 39.50 184.08 - 21.00 83.58 267.66

6 Pipa GIP dia. 3" Tebal 2.0 mm Batang GUNUNGSITOLI 434,700.00 39.50 184.08 - 21.00 83.58 267.66

7 Pipa GIP dia. 4" Tebal 2.0 mm Batang GUNUNGSITOLI 633,938.00 39.50 184.08 21.00 83.58 267.66

8 Kawat ikat /bendrat Kg GUNUNGSITOLI 25,000.00 39.50 184.08 21.00 83.58 267.66

9 Besi CNP 7 x 3.5 x 6 m Batang GUNUNGSITOLI 222,000.00 39.50 184.08 21.00 83.58 267.66

F PENUTUP ATAP

1 Atap Bitumen M2 GUNUNGSITOLI 80,000.00 39.50 184.08 21.00 83.58 267.66

2 Atap Spandek M2 GUNUNGSITOLI 56,250.00 39.50 184.08 21.00 83.58 267.66

3 Rabung Spandek 0.3 mm M' GUNUNGSITOLI 56,250.00 39.50 184.08 21.00 83.58 267.66

4 Baut Kecil Baja Ringan Kotak GUNUNGSITOLI 168,750.00 39.50 184.08 21.00 83.58 267.66

5 Baut Besar Baja Ringan Bungkus GUNUNGSITOLI 150,000.00 39.50 184.08 21.00 83.58 267.66

6 GRC Board 9,0 mm Lembar GUNUNGSITOLI 312,500.00 39.50 184.08 21.00 83.58 267.66

7 Paku Scrup Bh GUNUNGSITOLI 700.00 39.50 184.08 21.00 83.58 267.66

8 Seng Gelombang Kodi GUNUNGSITOLI 950,000.00 39.50 184.08 21.00 83.58 267.66

9 Seng Pelat M' GUNUNGSITOLI 41,250.00 39.50 184.08 21.00 83.58 267.66

G SANITAIR

1 Pipa Pvc Type AW Diameter 3/4 " Batang GUNUNGSITOLI 53,750.00 39.50 184.08 21.00 83.58 267.66

2 Pipa Pvc Type AW Diameter 6 " Batang GUNUNGSITOLI - 39.50 184.08 21.00 83.58 267.66

3 Pipa Pvc Type AW Diameter 8" Batang GUNUNGSITOLI 875,000.00 39.50 184.08 21.00 83.58 267.66

H PENUTUP LANTAI

1 Lantai Keramik 20 x 20 cm Merk IKAD Kotak GUNUNGSITOLI 87,500.00 39.50 184.08 21.00 83.58 267.66

2 Lantai Keramik 40 x 40 cm Merk IKAD Kotak GUNUNGSITOLI 91,250.00 39.50 184.08 21.00 83.58 267.66

3 Bon-bon Keramik M' GUNUNGSITOLI 7,500.00 39.50 184.08 21.00 83.58 267.66

I ACC dan LAIN-LAIN

1 Kunci Tanam Bh GUNUNGSITOLI 437,500.00 39.50 184.08 21.00 83.58 267.66

2 Engsel Bh GUNUNGSITOLI 59,375.00 39.50 184.08 21.00 83.58 267.66

3 Grendel Bh GUNUNGSITOLI 56,250.00 39.50 184.08 21.00 83.58 267.66

4 Kran Bh GUNUNGSITOLI 43,125.00 39.50 184.08 21.00 83.58 267.66

5 Sealtape Bh GUNUNGSITOLI 5,500.00 39.50 184.08 21.00 83.58 267.66

6 Wastafel Bh GUNUNGSITOLI 348,023.00 39.50 184.08 21.00 83.58 267.66

7 Kawat Las Kg GUNUNGSITOLI 25,000.00 39.50 184.08 21.00 83.58 267.66

8 Solar Ltr GUNUNGSITOLI 7,000.00 39.50 184.08 21.00 83.58 267.66

9 Minyak Pelumas Ltr GUNUNGSITOLI 30,000.00 39.50 184.08 21.00 83.58 267.66

10 Kaca 5 mm M2 GUNUNGSITOLI 121,275.00 39.50 184.08 21.00 83.58 267.66

11 Water Tank Bh GUNUNGSITOLI 2,500,000.00 39.50 184.08 21.00 83.58 267.66

12 Pompa Air Panasonic Bh GUNUNGSITOLI 1,125,000.00 39.50 184.08 21.00 83.58 267.66

13 Lem Kayu Kg GUNUNGSITOLI 10,000.00 39.50 184.08 21.00 83.58 267.66

14 Paving Block Bh GUNUNGSITOLI 2,243.00 39.50 184.08 21.00 83.58 267.66


A DARI SUMBER MATERIAL DAN BAHAN

Total Jumlah Harga Keuntunga Jumlah Harga Dibulatkan


Sampai di Lokasi n 13 % Keseluruhan Satuan

(Rp) (Rp) (Rp) (Rp)


25 26 27 29 30

271,975.00 271,975.00 271,975.00 M3

193,775.00 193,775.00 193,775.00 M3

373,248.00 373,248.00 373,248.00 M3

380,723.00 380,723.00 380,723.00 M3

258,363.00 258,363.00 258,363.00 M3

334,723.00 334,723.00 334,723.00 M3

183,425.00 183,425.00 183,425.00 M3

102,460.00 102,460.00 102,460.00 Zak

201,710.00 201,710.00 201,710.00 Zak

326,673.00 326,673.00 326,673.00 M3

270,940.00 270,940.00 270,940.00 M3

389,923.00 389,923.00 389,923.00 M3

334,723.00 334,723.00 334,723.00 M3

418,673.00 418,673.00 418,673.00 M3

361,173.00 361,173.00 361,173.00 M3

6,408.32 6,408.32 6,408.00 Bh

2,108.00 2,108.00 2,108.00 Bh

412,958.02 412,958.02 412,958.00 M2

4,059,069.00 4,059,069.00 4,059,069.00 M3

3,918,654.00 3,918,654.00 3,918,654.00 M3

3,859,544.00 3,859,544.00 3,859,544.00 M3

3,239,694.00 3,239,694.00 3,239,694.00 M3

2,147,194.00 2,147,194.00 2,147,194.00 M3

26,562.31 26,562.31 26,562.00 Btg

22,537.31 22,537.31 22,537.00 Btg

232,444.00 232,444.00 232,444.00 M3

97,545.17 97,545.17 97,545.00 Lbr

19,118.25 19,118.25 19,118.00 Kg

97,868.25 97,868.25 97,868.00 Batang

50,368.25 50,368.25 50,368.00 Batang


15,017.66 15,017.66 15,017.00 Kg

12,541.66 12,541.66 12,541.00 Kg

12,863.66 12,863.66 12,863.00 Kg

206,517.66 206,517.66 206,517.00 Batang

450,267.66 450,267.66 450,267.00 Batang

434,967.66 434,967.66 434,967.00 Batang

634,205.66 634,205.66 634,205.00 Batang

25,267.66 25,267.66 25,267.00 Kg

222,267.66 222,267.66 222,267.00 Batang

80,267.66 80,267.66 80,267.00 M2

56,517.66 56,517.66 56,517.00 M2

56,517.66 56,517.66 56,517.00 M'

169,017.66 169,017.66 169,017.00 Kotak

150,267.66 150,267.66 150,267.00 Bungkus

312,767.66 312,767.66 312,767.00 Lembar

967.66 967.66 967.00 Bh

950,267.66 950,267.66 950,267.00 Kodi

41,517.66 41,517.66 41,517.00 M'

54,017.66 54,017.66 54,017.00 Batang

267.66 267.66 267.00 Batang

875,267.66 875,267.66 875,267.00 Batang

87,767.66 87,767.66 87,767.00 Kotak

91,517.66 91,517.66 91,517.00 Kotak

7,767.66 7,767.66 7,767.00 M'

437,767.66 437,767.66 437,767.00 Bh

59,642.66 59,642.66 59,642.00 Bh

56,517.66 56,517.66 56,517.00 Bh

43,392.66 43,392.66 43,392.00 Bh

5,767.66 5,767.66 5,767.00 Bh

348,290.66 348,290.66 348,290.00 Bh

25,267.66 25,267.66 25,267.00 Kg

7,267.66 7,267.66 7,267.00 Ltr

30,267.66 30,267.66 30,267.00 Ltr

121,542.66 121,542.66 121,542.00 M2

2,500,267.66 2,500,267.66 2,500,267.00 Bh

1,125,267.66 1,125,267.66 1,125,267.00 Bh

10,267.66 10,267.66 10,267.00 Kg

2,510.66 2,510.66 2,510.00 Bh


HARGA DAN JARAK RATA-RATA
DARI SUMBER BAHAN (QUARRY)

Harga Quarry/ Jarak Quarry


No. Uraian Satuan Royalty (Rp) (Km) Keterangan

A BAHAN GALIAN/TANAH
1 Tanah Timbunan Pilihan M3 169050.00 5.00
2 Tanah Timbunan Setempat M3 90850.00 5.00
3 Pasir Pasangan M3 207575.00 18.50
4 Pasir Beton M3 215050.00 18.50
5 Pasir Urug M3 92690.00 18.50
6 Sirtu M3 169050.00 18.50
7 Bukho M3 80500.00 5.00
B BAHAN PEREKAT
1 Semen serbaguna 50 kg/zak Zak 88000.00 60.50 GUNUNGSITOLI
2 Semen putih 40 kg/zak Zak 187250.00 60.50 GUNUNGSITOLI
C BATU/BATU CETAKAN
1 Batu Kali Belah jenis keras uk. 10-15 cm M3 161000.00 18.50
2 Batu Gunung Belah jenis keras 10-15 cm M3 168015.00 5.00
3 Kerikil Sungai disaring Uk. 0.5 - 2 cm M3 224250.00 18.50
4 Kerikil Sungai tidak disaring M3 169050.00 18.50
5 Batu Pecah 2-3 cm M3 253000.00 18.50
6 Batu Pecah 5-7 cm M3 195500.00 18.50
7 Batako Bh 5894.00 18.50
8 Batu bata uk. 5x10x20 cm Bh 1869.00 39.50
9 Batu Alam (Andesit) Uk. 30x60 cm M2 412500.00 60.50 GUNUNGSITOLI
D KAYU/LANGIT-LANGIT
1 Broti/papan kayu simalambuo M3 3981875.00 5.00
2 Broti/papan kayu Afoa, Godu (jenis keras) M3 3841460.00 5.00
3 Broti/papan kayu Berua, Manawadano M3 3782350.00 5.00
4 Broti/papan Kale-kale, Siholi, Ri'i, Kuruil, Baru M3 3162500.00 5.00
5 Kayu Sembarang M3 2070000.00 5.00
6 Kayu bulat dia. 10-15; Pnj. 3,5 m Btg 24150.00 5.00
7 Kayu bulat dia. 7-8; Pnj. 3,5 m (dolo2) Btg 20125.00 5.00
8 Kayu Api M3 155250.00 5.00
9 Tripleks 4 mm Lbr 87500.00 60.50 GUNUNGSITOLI
10 Paku kayu (segala ukuran) Kg 18750.00 60.50 GUNUNGSITOLI
11 Profil Aluminium C-75 Tebal 0,75 mm Batang 97500.00 60.50 GUNUNGSITOLI
12 Profil Aluminium V Tebal 0,45 mm Batang 50000.00 60.50 GUNUNGSITOLI
E BESI/ALUMINIUM
1 Besi Profil Kg 14750.00 60.50 GUNUNGSITOLI
2 Besi Beton polos Kg 12274.00 60.50 GUNUNGSITOLI
3 Besi Beton ulir Kg 12596.00 60.50 GUNUNGSITOLI
4 Besi Hollow 40 x 40 mm Batang 206250.00 60.50 GUNUNGSITOLI
5 Pipa GIP dia. 2" Tebal 2.0 mm Batang 450000.00 60.50 GUNUNGSITOLI
6 Pipa GIP dia. 3" Tebal 2.0 mm Batang 434700.00 60.50 GUNUNGSITOLI
7 Pipa GIP dia. 4" Tebal 2.0 mm Batang 633938.00 60.50 GUNUNGSITOLI
8 Kawat ikat /bendrat Kg 25000.00 60.50 GUNUNGSITOLI
9 Besi CNP 7 x 3.5 x 6 m Batang 222000.00 60.50 GUNUNGSITOLI
F PENUTUP ATAP
1 Atap Bitumen M2 80000.00 60.50 GUNUNGSITOLI
2 Atap Spandek M2 56250.00 60.50 GUNUNGSITOLI
3 Rabung Spandek 0.3 mm M' 56250.00 60.50 GUNUNGSITOLI
4 Baut Kecil Baja Ringan Kotak 168750.00 60.50 GUNUNGSITOLI
5 Baut Besar Baja Ringan Bungkus 150000.00 60.50 GUNUNGSITOLI
6 GRC Board 9,0 mm Lembar 312500.00 60.50 GUNUNGSITOLI
7 Paku Scrup Bh 700.00 60.50 GUNUNGSITOLI
8 Seng Gelombang Kodi 950000.00 60.50 GUNUNGSITOLI
9 Seng Pelat M' 41250.00 60.50 GUNUNGSITOLI
G SANITAIR
1 Pipa Pvc Type AW Diameter 3/4 " Batang 53750.00 60.50 GUNUNGSITOLI
2 Pipa Pvc Type AW Diameter 6 " Batang 60.50 GUNUNGSITOLI
3 Pipa Pvc Type AW Diameter 8" Batang 875000.00 60.50 GUNUNGSITOLI
H PENUTUP LANTAI
1 Lantai Keramik 20 x 20 cm Merk IKAD Kotak 87500.00 60.50 GUNUNGSITOLI
2 Lantai Keramik 40 x 40 cm Merk IKAD Kotak 91250.00 60.50 GUNUNGSITOLI
3 Bon-bon Keramik M' 7500.00 60.50 GUNUNGSITOLI
I ACC dan LAIN-LAIN
1 Kunci Tanam Bh 437500.00 60.50 GUNUNGSITOLI
2 Engsel Bh 59375.00 60.50 GUNUNGSITOLI
3 Grendel Bh 56250.00 60.50 GUNUNGSITOLI
4 Kran Bh 43125.00 60.50 GUNUNGSITOLI
5 Sealtape Bh 5500.00 60.50 GUNUNGSITOLI
6 Wastafel Bh 348023.00 60.50 GUNUNGSITOLI
7 Kawat Las Kg 25000.00 60.50 GUNUNGSITOLI
8 Solar Ltr 7000.00 60.50 GUNUNGSITOLI
9 Minyak Pelumas Ltr 30000.00 60.50 GUNUNGSITOLI
10 Kaca 5 mm M2 121275.00 60.50 GUNUNGSITOLI
11 Water Tank Bh 2500000.00 60.50 GUNUNGSITOLI
12 Pompa Air Panasonic Bh 1125000.00 60.50 GUNUNGSITOLI
13 Lem Kayu Kg 10000.00 60.50 GUNUNGSITOLI
14 Paving Block Bh 2243.00 60.50 GUNUNGSITOLI
REKAPITULASI
PENYESUAIAN HARGA DASAR PERALATAN
PROPINSI SUMATERA UTARA TAHUN 2012

UMUR HARGA DPU THN. PENYESUAIAN


1991/1992
KODE Nilai Tukar
NO. JENIS PERALATAN KAPASITAS KETERANGAN
ALAT TAHUN JAM Nilai Tukar Tgl. 14 April 2012
Rp. 2000/USD Rp. 9175/USD
(Rp) (Rp)
1 BULDOZER E-001 100 HP 8 9,600 149,226,400.00 684,576,110.00

2 BULDOZER E-003 65 HP 8 9,600 96,558,400.00 442,961,660.00


3 MOTOR GRADER E-010 100 HP 8 12,000 166,782,000.00 765,112,425.00

4 HIDRAULIC EXCAVATOR 1,0 M3 E-020 90 HP 8 12,000 175,560,000.00 805,381,500.00


5 CRUSHER 30 T / H E-031 185 HP 10 15,000 306,446,000.00 1,405,821,025.00

6 CRUSHER 20 T / H E-032 95 HP 10 15,000 236,555,000.00 1,085,196,062.50

7 CRUSHER 10 T / H E-033 15 HP 8 12,000 129,030,000.00 591,925,125.00


8 SCREENING PLANT E-040 80 HP 8 12,000 107,525,000.00 493,270,937.50

9 LOADER TRACKED E-051 135 HP 8 12,000 230,423,000.00 1,057,065,512.50


10 LOADER WHEELED E-052 115 HP 8 12,000 120,698,000.00 553,702,075.00

11 TRACTOR WHEELED E-053 60 HP 10 15,000 42,937,000.00 196,973,487.50

12 ROLLER 3 WHEEL 6 - 8 TON E-080 50 HP 10 15,000 56,000,000.00 256,900,000.00


13 TANDEM ROLLER 6 - 10 TON E-081 40 HP 10 15,000 77,682,400.00 356,368,010.00

14 SELFT VIBRATOR ROLLER 6 - 7 TON E-082 35 HP 8 12,000 107,892,000.00 494,954,550.00


15 TOWED VIBRATOR ROLLER 2 - 3 TON E-083 6 HP 8 12,000 53,946,000.00 247,477,275.00

16 PNEUMATIC ROLLER 8 - 15 TON E-084 95 HP 10 15,000 140,259,000.00 643,438,162.50

17 VIBRATOR ROLLER 1 TON E-087 7 HP 6 7,200 22,503,000.00 103,232,512.50


18 PLATE VIBRATOR TAMPER E-088 4 HP 6 4,500 3,517,000.00 16,134,237.50

19 CONCRETE VIBRATOR E-089 4 HP 5 3,000 2,195,000.00 10,069,562.50


20 CHIP SPREADER 3 TON E-130 - HP 6 3,600 8,587,000.00 39,392,862.50

21 SPRAYER SELFPROPELLED E-153 38 HP 6 7,200 120,363,000.00 552,165,262.50


22 ASPHALT SPRAYER TOWED 400 L E-154 7 HP 6 4,500 10,305,000.00 47,274,187.50

23 ASPHALT MIXING PLANT 30 T/H E-155 125 HP 10 12,000 547,708,000.00 2,512,610,450.00

24 ASPHALT MIXING PLANT 10 T/H E-156 50 HP 10 12,000 284,808,000.00 1,306,556,700.00


25 ASPHALT FINISHER 1,82 m E-157 30 HP 7 8,400 65,835,000.00 302,018,062.50

26 FUEL TANK TRUCK E-172 115 HP 6 7,200 31,000,000.00 142,212,500.00


27 WATER TANK TRUCK E-182 115 HP 6 9,000 34,000,000.00 155,975,000.00

28 TRAILER TOWED E-191 1 TON 12 9,000 7,506,000.00 34,433,775.00

29 LOW LOADER, TRACTOR E-192 175 HP 10 7,500 108,822,000.00 499,220,925.00


30 DUMP TRUCK, 3,5 TON E-211 115 HP 6 9,000 30,000,000.00 137,625,000.00

31 DUMP TRUCK, 5,0 TON E-212 145 HP 6 9,000 50,000,000.00 229,375,000.00


32 FLAD BED TRUCK 3,5 TON E-221 80 HP 6 9,000 33,000,000.00 151,387,500.00

33 PICKUP TRUCK E-222 61 HP 6 9,000 38,157,000.00 175,045,237.50


34 JEEP 4 WHEEL DRIVE E-223 61 HP 6 9,000 38,333,000.00 175,852,637.50

35 FLAD BED TRUCK 5,0 TON E-224 145 HP 6 9,000 50,000,000.00 229,375,000.00

36 FLAD BED TRUCK WITH CRANE E-225 110 HP 6 9,000 69,774,000.00 320,088,225.00
37 MOTOR CYCLE E-226 14 HP 5 6,000 23,988,000.00 110,044,950.00

38 MOBILE WORKSHOP, 5 TON E-231 145 HP 6 9,600 108,822,000.00 499,220,925.00


39 LUBE TRUCK E-232 145 HP 6 9,600 55,691,000.00 255,482,462.50

40 CONCRETE MIXER 0,125 M3 E-251 6 HP 5 7,500 2,796,000.00 12,826,650.00

41 CONCRETE MIXER 0,25 M3 E-252 10 HP 5 7,500 12,903,000.00 59,192,512.50


42 CONCRETE MIXER 0,5 M3 E-253 20 HP 5 7,500 25,806,000.00 118,385,025.00

43 COMPRESSOR , AIR 210 M3 /H E-301 20 HP 8 6,000 21,908,000.00 100,502,950.00


44 GENERATOR E-311 10 HP 8 4,800 3,884,000.00 17,817,850.00

45 WATER PUMP ( Ø 5 CM ) E-341 8 HP 4 3,000 1,720,000.00 7,890,500.00


46 WATER PUMP ( Ø 10 CM ) E-342 10 HP 4 3,000 2,151,000.00 9,867,712.50

47 JACKHAMMER, EQUIPMENT, ETC. E-351 - HP 5 3,750 2,633,000.00 12,078,887.50

48 TRACTOR EQUIPMENT, ETC. E-401 - HP 5 3,000 21,835,000.00 100,168,062.50


HARGA DAN JARAK RATA-RATA

DARI SUMBER BAHAN (QUARRY)

No. Uraian Satuan Harga Quarry/ Jarak Quarry Keterangan


Royalty (Rp) (Km)

A DAFTAR PEKERJA

1 Batu Kali Belah jenis keras uk. 10/15 cm M3 161,000.00 29.00 LOTU

2 Batu Gunung Belah jenis keras 10/15 cm M3 168,015.00 5.00 LAHEWA

3 Kerikil Sungai disaring Uk. 0.5 - 2 cm M3 224,250.00 29.00 LOTU

4 Kerikil Sungai tidak disaring M3 169,050.00 29.00 LOTU

5 Pasir Pasangan M3 207,575.00 29.00 LOTU

6 Pasir Beton M3 215,050.00 29.00 LOTU

7 Batu Kali Pecah 2-3 cm M3 253,000.00 29.00 LOTU

8 Pasir Urug M3 92,690.00 29.00 LOTU

9 Sirtu M3 169,050.00 29.00 LOTU

10 Bukho M3 80,500.00 5.00 LAHEWA

11 Batako Bh 5,894.00 29.00 LOTU

12 Batu bata uk. 5x10x20 cm Bh 1,869.00 50.00 SITOLU ORI

13 Batu Alam (Andesit) Uk. 30x60 cm M2 412,500.00 71.00 GUNUNGSITOLI

14 Tanah Timbunan Pilihan M3 177,100.00 5.00 LAHEWA

15 Tanah Timbunan Setempat M3 90,850.00 5.00 LAHEWA

16 Broti/papan kayu simalambuo M3 3,981,875.00 5.00 LAHEWA

17 Broti/papan kayu Afoa, Godu (jenis keras) M3 3,887,460.00 5.00 LAHEWA

18 Broti/papan kayu Berua, Manawadano M3 3,782,350.00 5.00 LAHEWA


Broti/papan Kale-kale, Siholi, Ri'i,
19 Kuruil, Baruzo, Bayo M3 3,392,500.00 5.00 LAHEWA

20 Kayu Sembarang M3 2,070,000.00 5.00 LAHEWA

21 Kayu bulat dia. 10-15; Pnj. 3,5 m Btg 24,150.00 5.00 LAHEWA

22 Kayu bulat dia. 7-8; Pnj. 3,5 m (dolo2) Btg 20,125.00 5.00 LAHEWA

24 Kayu Api M3 172,500.00 5.00 LAHEWA

25 Tripleks 4 mm Lbr 87,500.00 71.00 GUNUNGSITOLI

26 Besi Beton polos Kg 12,274.00 71.00 GUNUNGSITOLI

27 Besi Beton ulir Kg 12,596.00 71.00 GUNUNGSITOLI

28 Paku kayu (segala ukuran) Kg 18,750.00 71.00 GUNUNGSITOLI

29 Baja Profil Kg 14,750.00 71.00 GUNUNGSITOLI

30 Seng Gelombang Lbr 47,500.00 71.00 GUNUNGSITOLI

31 Seng Pelat Lbr 41,250.00 71.00 GUNUNGSITOLI

32 Semen serbaguna 50 kg/zak Kg 88,000.00 71.00 GUNUNGSITOLI

33 Semen putih 40 kg/zak Kg 187,250.00 71.00 GUNUNGSITOLI

34 Kawat ikat /bendrat Kg 25,000.00 71.00 GUNUNGSITOLI

35 Pipa Pvc Merk Wavin Type AW Diameter 1/2 " Btg 43,750.00 71.00 GUNUNGSITOLI

36 Pipa Pvc Merk Wavin Type AW Diameter 1 " Btg 75,000.00 71.00 GUNUNGSITOLI

37 Pipa Pvc Merk Wavin Type AW Diameter 2 " Btg 162,500.00 71.00 GUNUNGSITOLI

39 Minyak bekisting Liter 35,000.00 71.00 GUNUNGSITOLI

40 Besi Hollow Merk Kobe 40 x 40 mm Btg 37,500.00 71.00 GUNUNGSITOLI

41 Lantai Keramik 20 x 20 cm Merk IKAD Kotak 87,500.00 71.00 GUNUNGSITOLI

42 Lantai Keramik 40 x 40 cm Merk IKAD Kotak 91,250.00 71.00 GUNUNGSITOLI

43 Kanal Trus C.75 merk A+ Btg 97,500.00 71.00 GUNUNGSITOLI

44 Reng Trus Baja Ringan Btg 50,000.00 71.00 GUNUNGSITOLI

45 Rabung Spandek 0.3 mm Lbr 56,250.00 71.00 GUNUNGSITOLI

46 Baut Kecil Baja Ringan Bgks 168,750.00 71.00 GUNUNGSITOLI

47 Baut Besar Baja Ringan Ktk 150,000.00 71.00 GUNUNGSITOLI

48 Atap Spandek 0.3 mm dan Pemasangan M2 56,250.00 71.00 GUNUNGSITOLI

49 Besi CNP 7 x 3.5 x 6 m Btg 222,000.00 71.00 GUNUNGSITOLI

50

51

52

53

54
55
HARGA DAN JARAK RATA-RATA DARI SUMBER MATERIAL DAN BAHAN

PROYEK :

PEKERJAAN : PEMBANGUNAN SARANA OBJEK WISATA DI PANTAI INDAH TURELOTO KEC. LAHEWA (LANJUTAN)

LOKASI :

Ongkos Truk (Rp) Ongkos Truk (Rp)


Harga Angkut Sampai Dilokasi
Medan Jalan Medan Jalan
Bahan Mineral Jarak
Harga dan Bukan Jarak Angkut Angkut Ongkos Angkut Total Jumlah Harga Keuntungan Jumlah Harga
Tangkahan Laut Kondisi Kondisi Laut Mil/Laut Sampai di Lokasi 13 % Keseluruhan Dibulatkan
Tempat Logam 20 % Pikul
No Uraian SATUAN Tangkahan Satuan
Jarak Angkut Jarak Angkut Dengan Angkut Dengan Dengan
Darat Truk Datar Darat Truk Bukit Truck Tenaga Pikul Angkut Laut
Baik Sedang Jelek Baik Sedang Jeles

(Rp) (Rp) ( Mil ) ( Km ) (Km) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

1 Batu Kali Belah jenis keras uk. 10/15 cm M3 LOTU 161,000.00 29.00 214,477.00 214,477.00 214,477.00 214,477.00 214,477.00 M3

2 Batu Gunung Belah jenis keras 10/15 cm M3 LAHEWA 168,015.00 5.00 102,925.00 102,925.00 270,940.00 270,940.00 270,940.00 M3

3 Kerikil Sungai disaring Uk. 0.5 - 2 cm M3 LOTU 224,250.00 44,850.00 29.00 214,477.00 214,477.00 438,727.00 483,577.00 483,577.00 M3

4 Kerikil Sungai tidak disaring M3 LOTU 169,050.00 33,810.00 29.00 214,477.00 214,477.00 383,527.00 417,337.00 417,337.00 M3

5 Pasir Pasangan M3 LOTU 207,575.00 41,515.00 29.00 214,477.00 214,477.00 422,052.00 463,567.00 463,567.00 M3

6 Pasir Beton M3 LOTU 215,050.00 43,010.00 29.00 214,477.00 214,477.00 429,527.00 472,537.00 472,537.00 M3

7 Batu Kali Pecah 2-3 cm M3 LOTU 253,000.00 50,600.00 29.00 214,477.00 214,477.00 467,477.00 518,077.00 518,077.00 M3

8 Pasir Urug M3 LOTU 92,690.00 18,538.00 29.00 214,477.00 214,477.00 307,167.00 325,705.00 325,705.00 M3

9 Sirtu M3 LOTU 169,050.00 33,810.00 29.00 214,477.00 214,477.00 383,527.00 417,337.00 417,337.00 M3

10 Bukho M3 LAHEWA 80,500.00 5.00 102,925.00 102,925.00 183,425.00 183,425.00 183,425.00 M3

11 Batako Bh LOTU 5,894.00 29.00 441.13 21.00 184.17 625.30 6,519.30 6,519.30 6,519.00 M2

12 Batu bata uk. 5x10x20 cm Bh SITOLU ORI 1,869.00 29.00 441.13 21.00 184.17 625.30 2,494.30 2,494.30 2,494.00 M3

13 Batu Alam (Andesit) Uk. 30x60 cm M2 GUNUNGSITOLI 412,500.00 50.00 587.50 21.00 184.17 771.67 413,271.67 413,271.67 413,271.00 M3

14 Tanah Timbunan Pilihan M3 LAHEWA 177,100.00 35,420.00 5.00 102,925.00 102,925.00 280,025.00 315,445.00 315,445.00 M3

15 Tanah Timbunan Setempat M3 LAHEWA 90,850.00 18,170.00 5.00 102,925.00 102,925.00 193,775.00 211,945.00 211,945.00 M3

16 Broti/papan kayu simalambuo M3 LAHEWA 3,981,875.00 5.00 77,194.00 77,194.00 4,059,069.00 4,059,069.00 4,059,069.00 M3

17 Broti/papan kayu Afoa, Godu (jenis keras) M3 LAHEWA 3,887,460.00 5.00 77,194.00 77,194.00 3,964,654.00 3,964,654.00 3,964,654.00 M3

18 Broti/papan kayu Berua, Manawadano M3 LAHEWA 3,782,350.00 5.00 77,194.00 77,194.00 3,859,544.00 3,859,544.00 3,859,544.00 M3

19 Broti/papan Kale-kale, Siholi, Ri'i, Kuruil, Baruzo, Bayo M3 LAHEWA 3,392,500.00 5.00 77,194.00 77,194.00 3,469,694.00 3,469,694.00 3,469,694.00 M3

20 Kayu Sembarang M3 LAHEWA 2,070,000.00 5.00 77,194.00 77,194.00 2,147,194.00 2,147,194.00 2,147,194.00 M3

21 Kayu bulat dia. 10-15; Pnj. 3,5 m Btg LAHEWA 24,150.00 5.00 77,194.00 77,194.00 101,344.00 101,344.00 101,344.00 Btg

23 Kayu bulat dia. 7-8; Pnj. 3,5 m (dolo2) Btg LAHEWA 20,125.00 5.00 77,194.00 77,194.00 97,319.00 97,319.00 97,319.00 Btg

24 Kayu Api M3 LAHEWA 172,500.00 5.00 77,194.00 77,194.00 249,694.00 249,694.00 249,694.00 Lbr

25 Tripleks 4 mm Lbr GUNUNGSITOLI 87,500.00 50.00 217.36 21.00 83.58 300.94 87,800.94 87,800.94 87,800.00 Lbr

26 Besi Beton polos Kg GUNUNGSITOLI 12,274.00 50.00 217.36 21.00 83.58 300.94 12,574.94 12,574.94 12,574.00 Kg

27 Besi Beton ulir Kg GUNUNGSITOLI 12,596.00 50.00 217.36 21.00 83.58 300.94 12,896.94 12,896.94 12,896.00 Kg

28 Paku kayu (segala ukuran) Kg GUNUNGSITOLI 18,750.00 50.00 217.36 21.00 83.58 300.94 19,050.94 19,050.94 19,050.00 Kg

29 Baja Profil Kg GUNUNGSITOLI 14,750.00 50.00 217.36 21.00 83.58 300.94 15,050.94 15,050.94 15,050.00 Lbr

30 Seng Gelombang Lbr GUNUNGSITOLI 47,500.00 50.00 217.36 21.00 83.58 300.94 47,800.94 47,800.94 47,800.00 Lbr

31 Seng Pelat Lbr GUNUNGSITOLI 41,250.00 50.00 217.36 21.00 83.58 300.94 41,550.94 41,550.94 41,550.00 Lbr

32 Semen serbaguna 50 kg/zak Kg GUNUNGSITOLI 88,000.00 50.00 11,688.00 21.00 83.58 11,771.58 99,771.58 99,771.58 99,771.00 Kg

33 Semen putih 40 kg/zak Kg GUNUNGSITOLI 187,250.00 50.00 11,688.00 21.00 83.58 11,771.58 199,021.58 199,021.58 199,021.00 Kg

34 Kawat ikat /bendrat Kg GUNUNGSITOLI 25,000.00 50.00 217.36 21.00 83.58 300.94 25,300.94 25,300.94 25,300.00 Kg

35 Pipa Pvc Merk Wavin Type AW Diameter 1/2 " Btg GUNUNGSITOLI 43,750.00 50.00 217.36 21.00 83.58 300.94 44,050.94 44,050.94 44,050.00 Btg

36 Pipa Pvc Merk Wavin Type AW Diameter 1 " Btg GUNUNGSITOLI 75,000.00 50.00 217.36 21.00 83.58 300.94 75,300.94 75,300.94 75,300.00 Btg

37 Pipa Pvc Merk Wavin Type AW Diameter 2 " Btg GUNUNGSITOLI 162,500.00 50.00 217.36 21.00 83.58 300.94 162,800.94 162,800.94 162,800.00 Btg

38 Pipa Pvc Type AW Diameter 2 "/panj. 6 m Btg GUNUNGSITOLI 162,500.00 50.00 217.36 21.00 83.58 300.94 162,800.94 162,800.94 162,800.00 Btg

39 Minyak bekisting Liter GUNUNGSITOLI 35,000.00 50.00 217.36 21.00 83.58 300.94 35,300.94 35,300.94 35,300.00 Liter

40 Besi Hollow Merk Kobe 40 x 40 mm Btg GUNUNGSITOLI 37,500.00 50.00 217.36 21.00 83.58 300.94 37,800.94 37,800.94 37,800.00 Btg

41 Lantai Keramik 20 x 20 cm Merk IKAD Kotak GUNUNGSITOLI 87,500.00 50.00 217.36 21.00 83.58 300.94 87,800.94 87,800.94 87,800.00 Kotak

42 Lantai Keramik 40 x 40 cm Merk IKAD Kotak GUNUNGSITOLI 91,250.00 50.00 217.36 21.00 83.58 300.94 91,550.94 91,550.94 91,550.00 Kotak

43 Kanal Trus C.75 merk A+ Btg GUNUNGSITOLI 97,500.00 50.00 217.36 21.00 83.58 300.94 97,800.94 97,800.94 97,800.00 Btg

44 Reng Trus Baja Ringan Btg GUNUNGSITOLI 50,000.00 50.00 217.36 21.00 83.58 300.94 50,300.94 50,300.94 50,300.00 Btg

45 Rabung Spandek 0.3 mm Lbr GUNUNGSITOLI 56,250.00 50.00 217.36 21.00 83.58 300.94 56,550.94 56,550.94 56,550.00 Lbr

46 Baut Kecil Baja Ringan Bgks GUNUNGSITOLI 168,750.00 50.00 217.36 21.00 83.58 300.94 169,050.94 169,050.94 169,050.00 Bgks

47 Baut Besar Baja Ringan Ktk GUNUNGSITOLI 150,000.00 50.00 217.36 21.00 83.58 300.94 150,300.94 150,300.94 150,300.00 Ktk

48 Atap Spandek 0.3 mm dan Pemasangan M2 GUNUNGSITOLI 56,250.00 50.00 217.36 21.00 83.58 300.94 56,550.94 56,550.94 56,550.00 M2
49 Besi CNP 7 x 3.5 x 6 m Btg GUNUNGSITOLI 222,000.00 50.00 217.36 21.00 83.58 300.94 222,300.94 222,300.94 222,300.00 Btg