M-1 M-2
NO JENIS PEKERJAAN BOBOT (%) 22 Jul 2020 29 Jul 2020
PEKERJAAN STRUKTUR
2.1. Lantai Satu (elevasi 0.00) 10.8548
PEKERJAAN ARSITEK
3.1. PEKERJAAN PASANGAN LANTAI 2.2006
PEKERJAAN PLUMBING
PEKERJAAN STRUKTUR
1.1. PEKERJAAN PONDASI TIANG PANCANG 11.6812
1.2. PEKERJAAN LINEX
PEKERJAAN PONDASI 4.242
PEKERJAAN STRUKTUR 20.7322
Disetujui Oleh
PEJABAT PEMBUAT KOMITMEN DINAS PERUMAHAN DA
BELANJA MODAL
RSUP dr. RIVAI ABDULAH PALEMBANG
dr. ALWI SAMY, MKM Dr. KM. AMINUDD
NIP. 197505082002121007
JADWAL PELAKSANAAN PEKERJAAN
WAKTU PELAKSANAAN
M-3 M-4 M-5 M-6 M-7 M-8 M-9
05 Agu 2020 12 Agu 2020 BOBOT REALISASI 19 Agu 2020 26 Agu 2020 02 Sep 2020 09 Sep 2020 16 Sep 2020
BOBOT SISA BOBOT MC0
12 Agu 2020 19 Agu 2020 26 Agu 2020 02 Sep 2020 09 Sep 2020 16 Sep 2020 23 Sep 2020
0.0967 0.0967 0.0154 0.6860 0.7014 0.0429 0.0429 0.0429 0.0429 0.0429
0.0019 0.0019 0.019 0.0196 0.0386 0.0012 0.0012 0.0012 0.0012 0.0012
9.7035 9.7035
10.2622 10.2622
8.7467 8.7467
1.8615 1.8615
1.0435 1.0435
0.5211 0.5211
0.4084 0.4084
0.099 0.858 0.672 99.328 100.000 0.662 3.651 6.348 8.277 11.461
0.296 1.154 1.335 4.986 11.333 19.611 31.072
30 Sep 2020 07 Oct 2020 14 Oct 2020 21 Oct 2020 28 Oct 2020 04 Nov 2020 11 Nov 2020 18 Nov 2020 25 Nov 2020 02 Dec 2020
0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429
0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012
2.6968
0.2606 0.2606
0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822
1.9347 1.9347
0.6183
0.0673 0.0673 0.0673 0.0673 0.0673
10.407 10.326 8.392 8.811 5.659 8.641 5.841 6.189 3.534 0.902
41.479 51.805 60.197 69.008 74.666 83.308 89.149 95.338 98.872 99.774
09 Dec 2020
0.0429
0.0012
0.1822
0.226
100.000