M-1 M-2
NO JENIS PEKERJAAN BOBOT (%) 22 Jul 2020 29 Jul 2020

29 Jul 2020 05 Agu 2020

I. PEKERJAAN PERSIAPAN 1.9334 0.0967 0.0967

II PEKERJAAN BANGUNAN UTAMA


PEKERJAAN STANDAR
PEKERJAAN PERSIAPAN 0.0388 0.0019 0.0019

PEKERJAAN STRUKTUR
2.1. Lantai Satu (elevasi 0.00) 10.8548

2.2. Lantai Dua (elevasi +4.50) 12.0796

2.3. Lantai Tiga (elevasi +9.00) 9.7645

2.4. Lantai Empat (elevasi +13.50) 10.3267

2.5. Lantai R. Mesin Lift (elevasi +19,00 m) 8.8017


a. Pekerjaan Struktur Beton Balok dan Plat Lantai
b. Pekerjaan Struktur Beton Kolom

2.6. Lantai Dak Crown 1 (elevasi +21,00 m) 1.8731


a. Pekerjaan Struktur Beton Balok dan Plat Lantai
b. Pekerjaan Struktur Beton Kolom

2.7. Lantai Dak (elevasi +22,00 m) 1.05


a. Pekerjaan Struktur Beton Balok dan Plat Lantai

2.8. Lantai Dak Crown 2 (elevasi +24,55 m) 0.5244

PEKERJAAN ARSITEK
3.1. PEKERJAAN PASANGAN LANTAI 2.2006

PEKERJAAN PLUMBING

4.1. PEKERJAAN PIPA AIR HUJAN 0.411

PEKERJAAN NON STANDAR

PEKERJAAN STRUKTUR
1.1. PEKERJAAN PONDASI TIANG PANCANG 11.6812
1.2. PEKERJAAN LINEX
PEKERJAAN PONDASI 4.242
PEKERJAAN STRUKTUR 20.7322

III PEKERJAAN SITE DEVELOPMENT


I. PEKERJAAN TANAH 3.0356
II. PEKERJAAN SALURAN KELILING 0.4503

JUMLAH TOTAL 100.000 0.099 0.099


RENCANA PROGRESS MINGGUAN 0
0,000 0.099 0.198
RENCANA PROGRESS MINGGUAN KOMULATIF

Disetujui Oleh
PEJABAT PEMBUAT KOMITMEN DINAS PERUMAHAN DA
BELANJA MODAL
RSUP dr. RIVAI ABDULAH PALEMBANG
dr. ALWI SAMY, MKM Dr. KM. AMINUDD
NIP. 197505082002121007
JADWAL PELAKSANAAN PEKERJAAN

WAKTU PELAKSANAAN
M-3 M-4 M-5 M-6 M-7 M-8 M-9
05 Agu 2020 12 Agu 2020 BOBOT REALISASI 19 Agu 2020 26 Agu 2020 02 Sep 2020 09 Sep 2020 16 Sep 2020
BOBOT SISA BOBOT MC0
12 Agu 2020 19 Agu 2020 26 Agu 2020 02 Sep 2020 09 Sep 2020 16 Sep 2020 23 Sep 2020

0.0967 0.0967 0.0154 0.6860 0.7014 0.0429 0.0429 0.0429 0.0429 0.0429

0.0019 0.0019 0.019 0.0196 0.0386 0.0012 0.0012 0.0012 0.0012 0.0012

10.7871 10.7871 2.6968 2.6968 2.6968

12.0042 12.0042 3.0011

9.7035 9.7035

10.2622 10.2622

8.7467 8.7467

1.8615 1.8615

1.0435 1.0435

0.5211 0.5211

2.1869 2.1869 0.1822

0.4084 0.4084

11.6083 11.6083 1.9347 1.9347 1.9347 1.9347

4.2155 4.2155 1.0539 1.0539 1.0539 1.0539


21.2272 21.2272 1.9297 1.9297

0.7589 0.638 3.7096 4.3476 0.6183 0.6183 0.6183 0.6183 0.6183


0.3364 0.3364

0.099 0.858 0.672 99.328 100.000 0.662 3.651 6.348 8.277 11.461
0.296 1.154 1.335 4.986 11.333 19.611 31.072

Tim Teknis Diperiksa Oleh


DINAS PERUMAHAN DAN PERMUKIMAN PT PINANGSIANG PUTRA CEMERLAN
SUMATERA SELATAN
Dr. KM. AMINUDDIN, ST. MT Ir. A SUTISNA ABDUL AZIZ, MT. MM
NIP. 1972203141999031006 Team Leader
AKTU PELAKSANAAN
M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17 M-18 M-19
23 Sep 2020 30 Sep 2020 07 Oct 2020 14 Oct 2020 21 Oct 2020 28 Oct 2020 04 Nov 2020 11 Nov 2020 18 Nov 2020 25 Nov 2020

30 Sep 2020 07 Oct 2020 14 Oct 2020 21 Oct 2020 28 Oct 2020 04 Nov 2020 11 Nov 2020 18 Nov 2020 25 Nov 2020 02 Dec 2020

0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429 0.0429

0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012 0.0012

2.6968

3.0011 3.0011 3.0011

3.2345 3.2345 3.2345

3.4207 3.4207 3.4207

2.9156 2.9156 2.9156

0.6205 0.6205 0.6205

0.3478 0.3478 0.3478

0.2606 0.2606

0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822 0.1822

0.0817 0.0817 0.0817 0.0817 0.0817

1.9347 1.9347

1.9297 1.9297 1.9297 1.9297 1.9297 1.9297 1.9297 1.9297 1.9297

0.6183
0.0673 0.0673 0.0673 0.0673 0.0673

10.407 10.326 8.392 8.811 5.659 8.641 5.841 6.189 3.534 0.902
41.479 51.805 60.197 69.008 74.666 83.308 89.149 95.338 98.872 99.774

Banyuasin, 22 Juli 2020


iperiksa Oleh Dibuat Oleh
NG PUTRA CEMERLANG PT TIRTA DHEA ADDONICS PRATAMA
A ABDUL AZIZ, MT. MM Drs. AGUS SETYAWAN
Team Leader Direktur
M-20
02 Dec 2020

09 Dec 2020

0.0429

0.0012

0.1822

0.226
100.000